WorldWideScience

Sample records for lease program interim

  1. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  2. 77 FR 74512 - Interim Policy Leasing for Renewable Energy Data Collection Facility on the Outer Continental...

    Science.gov (United States)

    2012-12-14

    ... Company to conduct data collection and technology testing activities in one of the following ways: 1... Management Service, now BOEM, announced an interim policy for authorizing the issuance of leases for the installation of offshore data collection and technology testing facilities on the OCS (72 FR 62673). An...

  3. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  4. Interim reliability evaluation program (IREP)

    International Nuclear Information System (INIS)

    Carlson, D.D.; Murphy, J.A.

    1981-01-01

    The Interim Reliability Evaluation Program (IREP), sponsored by the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission, is currently applying probabilistic risk analysis techniques to two PWR and two BWR type power plants. Emphasis was placed on the systems analysis portion of the risk assessment, as opposed to accident phenomenology or consequence analysis, since the identification of risk significant plant features was of primary interest. Traditional event tree/fault tree modeling was used for the analysis. However, the study involved a more thorough investigation of transient initiators and of support system faults than studies in the past and substantially improved techniques were used to quantify accident sequence frequencies. This study also attempted to quantify the potential for operator recovery actions in the course of each significant accident

  5. 7 CFR 772.7 - Leasing minor program loan security.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Leasing minor program loan security. 772.7 Section 772..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.7 Leasing minor program loan security. (a) Eligibility. The Agency may consent to the borrower leasing all or a portion of security...

  6. Oil and gas leasing/production program

    International Nuclear Information System (INIS)

    Heimberger, M.L.

    1992-01-01

    As the Congress declared in the Outer Continental Shelf Lands Act the natural gas and oil production from the Outer Continental Shelf constitutes an important part of the Nation's domestic energy supply. Federal offshore minerals are administered within the Department of the Interior by the Minerals Management Service (MMS), which provides access to potential new sources of natural gas and oil offshore by conducting lease sales. Each year, on or before March 31, the MMS presents to Congress a fiscal year annual report on the Federal offshore natural gas and oil leasing and production program. In FY 1991, this program was the third largest producer of non-tax revenue for the US Treasury, contributing more than $3 billion. This report presents Federal offshore leasing, sales, production, and exploration activities, and environmental monitoring activities

  7. Solar lease grant program. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    Progress on a lease program for the installation of a solar water heater with no installation charge is reported. Information on the announcement of the program, the selection of participants, the contractural agreement, progress on installation of equipment, monitoring, and evaluation is summarized. The status of the budget concerned with the program is announced. Forms used for applications for the program and an announcement from Resource Alternatives for Cilco customers are presented.

  8. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  9. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  10. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  11. Final environmental statement for the geothermal leasing program

    Energy Technology Data Exchange (ETDEWEB)

    1973-12-31

    This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

  12. Final Environmental assessment for the Uranium Lease Management Program

    International Nuclear Information System (INIS)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE's ''best interest'' is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI)

  13. Final Environmental assessment for the Uranium Lease Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  14. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  15. A links manipulator simulation program interim report

    International Nuclear Information System (INIS)

    Noble, R.A.

    1987-04-01

    A computer program to simulate the performance of the Heysham II rail-following manipulator has been developed. The program is being used to develop and test the rail-following control algorithms which will be used to control movements of the manipulator when it is operating below the gas baffle dome. The simulation includes the dynamic responses of the manipulator joint drives, excluding friction, backlash and compliance. It also includes full details of the manipulator's geometry. A method is given whereby the actual manipulator dynamics can be written into the program once these have been established by measurement. The program is written in FORTRAN and runs on a Perkin-Elmer 3220 mini-computer. The simulation program responds to velocity demands on the individual joints. These will normally come from the control program, in which they will be manually controlled by a joystick. A sigma 5664 colour graphics generator is programmed to display the current position of the manipulator. (UK)

  16. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  17. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  18. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  19. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  20. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  1. Lamar Low-Level Jet Program Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, N.; Shirazi, M.; Jager, D.; Wilde, S.; Adams, J.; Buhl, M.; Sullivan, P.; Patton, E.

    2004-01-01

    This interim report presents the results to date from the Lamar Low-Level Jet Program (LLLJP) that has been established as joint effort among the U.S. Department of Energy (DOE), the National Wind Technology Center (NWTC) of the National Renewable Energy Laboratory (NREL), and General Electric Wind Energy (GE Wind). The purpose of this project is to develop an understanding of the influence of nocturnal low-level jet streams on the inflow turbulence environment and the documenting of any potential operating impacts on current large wind turbines and the Low Wind Speed Turbine (LWST) designs of the future. A year's record of detailed nocturnal turbulence measurements has been collected from NREL instrumentation installed on the GE Wind 120-m tower in southeastern Colorado and supplemented with mean wind profile data collected using an acoustic wind profiler or SODAR (Sound Detection and Ranging). The analyses of measurements taken as part of a previous program conducted at the NWTC have been used to aid in the interpretation of the results of representative case studies of data collected from the GE Wind tower.

  2. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  3. 77 FR 24734 - Outer Continental Shelf (OCS) Renewable Energy Program Leasing for Marine Hydrokinetic Technology...

    Science.gov (United States)

    2012-04-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management [Docket No. BOEM-2012-0011] Outer Continental Shelf (OCS) Renewable Energy Program Leasing for Marine Hydrokinetic Technology Testing Offshore Florida AGENCY: Bureau of Ocean Energy Management, Interior. ACTION: Notice of the Availability of an...

  4. 41 CFR 101-26.501-9 - Centralized motor vehicle leasing program.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Centralized motor vehicle leasing program. 101-26.501-9 Section 101-26.501-9 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26...

  5. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  6. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Science.gov (United States)

    2011-12-01

    ... for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance... (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam Generators.'' This LR-ISG provides the...) document, NEI 97-06, ``Steam Generator Program Guidelines,'' (NRC's Agencywide Documents Access and...

  7. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  8. Results from the Interim Salt Disposition Program Macrobatch 11 Tank 21H Acceptance Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-11-13

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).

  9. Waste resources utilization program. Interim report, June 30, 1976

    International Nuclear Information System (INIS)

    1976-07-01

    This is an interim report on the effects of the combined use of heat and ionizing radiation (thermoradiation) as a treatment for ridding sewage sludge of pathogenic organisms as well as its effect on the physical-chemical properties. This activity couples two major environmental problems, disposition of human and of nuclear waste, in an attempt to provide a framework in which both will become useful resources. This combined treatment might be chosen to inactivate both heat labile (but possibly radiation resistant) and radiation labile (but possibly heat resistant) organisms. The cost-effective analyses of such a treatment are being examined. Sludge treated with thermoradiation offers considerable potential for use as a fertilizer in agriculture or a soil conditioner for land reclamation free of the potential health hazards associated with conventional methods of land disposal. Treated sludge may also provide a low-cost substitute for high-nutritional components in ruminant diets

  10. 76 FR 30184 - Outer Continental Shelf (OCS) Renewable Energy Program Interim Policy Leasing for Marine...

    Science.gov (United States)

    2011-05-24

    ... Marine Hydrokinetic Technology Testing Offshore Florida AGENCY: Bureau of Ocean Energy Management.... On June 11, 2010 Florida Atlantic University's (FAU) Southeast National Marine Renewable Energy... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket...

  11. 10 CFR 760.1 - Uranium leases on lands controlled by DOE. (Domestic Uranium Program Circular No. 760.1, formerly...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Uranium leases on lands controlled by DOE. (Domestic Uranium Program Circular No. 760.1, formerly (AEC) Domestic Uranium Program Circular 8, 10 CFR 60.8). 760.1 Section 760.1 Energy DEPARTMENT OF ENERGY DOMESTIC URANIUM PROGRAM § 760.1 Uranium leases on lands...

  12. Seismic Safety Margins Research Program. Phase I. Interim definition of terms

    International Nuclear Information System (INIS)

    Smith, P.D.; Dong, R.G.

    1980-01-01

    This report documents interim definitions of terms in the Seismic Safety Margins Research Program (SSMRP). Intent is to establish a common-based terminology integral to the probabilistic methods that predict more realistically the behavior of nuclear power plants during an earthquake. These definitions are a response to a request by the Nuclear Regulatory Commission Advisory Committee on Reactor Safeguards at its meeting held November 15-16, 1979

  13. 76 FR 70156 - Proposed 5-Year Outer Continental Shelf (OCS) Oil and Gas Leasing Program for 2012-2017

    Science.gov (United States)

    2011-11-10

    ... Analysis for the OCS 5-Year Program 2012-2017: Theory and Methodology (BOEM 050-2011), a paper containing a..., which remain the two areas of highest resource potential and interest, the Proposed Program schedules..., and setting the fiscal terms and conditions by individual lease sale, based on a current assessment of...

  14. Linear Programming for Vocational Education Planning. Interim Report.

    Science.gov (United States)

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  15. 3013/9975 Surveillance Program Interim Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-06-22

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program [Reference 1] outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) [Reference 2] for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container [Reference 3]. The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure & Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure & Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013

  16. 3013/9975 Surveillance Program Interim Summary Report

    International Nuclear Information System (INIS)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-01-01

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program (Reference 1) outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) (Reference 2) for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container (Reference 3). The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure and Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure and Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013

  17. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  18. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Science.gov (United States)

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  19. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Data Report No. 1

    Energy Technology Data Exchange (ETDEWEB)

    DOE; ORNL; NREL; EMA; MECA

    1999-08-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim data report summarizes results as of August, 1999, on the status of the test programs being conducted on three technologies: lean-NO{sub x} catalysts, diesel particulate filters and diesel oxidation catalysts.

  20. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    Science.gov (United States)

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  1. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  2. Long Term Inactive Well Program requirements : interim directive ID 97-08

    International Nuclear Information System (INIS)

    1997-01-01

    The Alberta Energy and Utilities Board and the petroleum industry have agreed that industry must take proactive measures to reduce the number of long term inactive wells in Alberta. This interim directive outlines the requirements of the Long Term Inactive Well Program, and provides a schedule for industry to reduce the number of inactive wells. EUB estimates that there are currently 35,000 inactive wells in Alberta, 10,000 of which have been inactive for more than 10 consecutive years. These wells pose a financial risk to the Abandonment Fund which was established to help fund the abandonment of orphan wells. The Long Term Inactive Well Program was created based on the recommendations of a joint government/industry committee, and will operate for five years. 5 tabs

  3. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Science.gov (United States)

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (pinstitution in the country increased.

  4. Interim reliability evaluation program: analysis of the Arkansas Nuclear One. Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kolb, G.J.; Kunsman, D.M.; Bell, B.J.

    1982-06-01

    This report represents the results of the analysis of Arkansas Nuclear One (ANO) Unit 1 nuclear power plant which was performed as part of the Interim Reliability Evaluation Program (IREP). The IREP has several objectives, two of which are achieved by the analysis presented in this report. These objectives are: (1) the identification, in a preliminary way, of those accident sequences which are expected to dominate the public health and safety risks; and (2) the development of state-of-the-art plant system models which can be used as a foundation for subsequent, more intensive applications of probabilistic risk assessment. The primary methodological tools used in the analysis were event trees and fault trees. These tools were used to study core melt accidents initiated by loss of coolant accidents (LOCAs) of six different break size ranges and eight different types of transients

  5. Insights from the interim reliability evaluation program pertinent to reactor safety issues

    International Nuclear Information System (INIS)

    Carlson, D.D.

    1983-01-01

    The Interim Reliability Evaluation Program (IREP) consisted of concurrent probabilistic analyses of four operating nuclear power plants. This paper presents and integrated view of the results of the analyses drawing insights pertinent to reactor safety. The importance to risk of accident sequences initiated by transients and small loss-of-coolant accidents was confirmed. Support systems were found to contribute significantly to the sets of dominant accident sequences, either due to single failures which could disable one or more mitigating systems or due to their initiating plant transients. Human errors in response to accidents also were important risk contributors. Consideration of operator recovery actions influences accident sequence frequency estimates, the list of accident sequences dominating core melt, and the set of dominant risk contributors. Accidents involving station blackout, reactor coolant pump seal leaks and ruptures, and loss-of-coolant accidents requiring manual initiation of coolant injection were found to be risk significant

  6. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Directory of Open Access Journals (Sweden)

    Andrea Evans

    Full Text Available INTRODUCTION: On June 30, 2012, Interim Federal Health Program (IFHP funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. METHODS: We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. RESULTS: There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001. INTERPRETATION: After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  7. Reducing Health Services for Refugees Through Reforms to the Interim Federal Health Program

    Directory of Open Access Journals (Sweden)

    Andrew C. Stevenson

    2018-04-01

    Full Text Available Since 1957 the Interim Federal Health Program (IFHP has provided temporary health care coverage to refugees and refugee claimants, but in 2012 the Conservative government reformed the IFHP, reducing, or eliminating access to health services for these groups. The government framed the changes around fairness and safety, stating that it would save tax payers $100 million over five years, reduce incentive for migrants with unfounded refugee claims from coming to Canada, protect public health and safety, and defend the integrity of the immigration system. With a Conservative majority, the reform was easily implemented despite a lack of evidence supporting these claims. In 2014, the Federal Court rejected the government's notion of fairness and safety, ruling that the cuts were cruel and unusual treatment of an already vulnerable population. The government appealed this ruling but, in 2016, the Liberals took power and restored funding to the IFHP to pre-2012 levels. Ad hoc evaluations predicted inequitable and adverse impacts on refugees, negative impacts on health, and increased costs to refugees, provincial governments, and health providers. Overall the threats and weaknesses of this reform clearly outweighed the few and unconvincing opportunities and strengths of the program, leading to its demise.

  8. 78 FR 16483 - Notice of Availability of the Draft Uranium Leasing Program Programmatic Environmental Impact...

    Science.gov (United States)

    2013-03-15

    ... Protection Agency (EPA); Colorado Department of Transportation; Colorado Division of Reclamation, Mining, and... via the internet at http://ulpeis.anl.gov/ gov/. DOE will give equal weight to written, email, and... Court, among other things, invalidated the July 2007 PEA and FONSI; stayed the ULP leases; and ordered...

  9. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  10. Analysis of removal of residual decay heat from interim storage facilities by means of the CFD program FLUENT

    International Nuclear Information System (INIS)

    Stratmann, W.; Hages, P.

    2004-01-01

    Within the scope of nuclear licensing procedures of on-site interim storage facilities for dual purpose casks it is necessary, among other things, to provide proof of sufficient removal of the residual decay heat emitted by the casks. The results of the analyses performed for this purpose define e.g. the boundary conditions for further thermal analyses regarding the permissible cask component temperatures or the maximum permissible temperatures of the fuel cladding tubes of the fuel elements stored in the casks. Up to now, for the centralized interim storage facilities in Germany such analyses were performed on the basis of experimental investigations using scaled-down storage geometries. In the engineering phase of the Lingen on-site interim storage facility, proof was furnished for the first time using the CFD (computational fluid dynamics) program FLUENT. The program FLUENT is an internationally recognized and comprehensively verified program for the calculation of flow and heat transport processes. Starting from a brief discussion of modeling and the different boundary conditions of the computation, this contribution presents various results regarding the temperatures of air, cask surfaces and storage facility components, the mass flows through the storage facility and the heat transfer at the cask surface. The interface point to the cask-specific analyses is defined to be the cask surface

  11. Sample Results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H Qualification Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Washington, A. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub- Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

  12. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Washington, II, A. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-13

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

  13. Conventional Leasing vs Islamic Leasing

    Directory of Open Access Journals (Sweden)

    Violeta ISAI

    2014-12-01

    Full Text Available Leasing developed in time, from the simple form of renting to the modern modality of financial from nowadays, as an alternative for loan. It is present in the entire world, being used both by the financial specialized companies and banks, and the clients are companies and population. The object of leasing contract can be assets and also services, which are rented by the financier (lessor, on definite period, to the client (lessee, in exchange for a leasing rate (rent. The registering in accounting and the fiscal implications in the companies financial administration are different, according to the leasing form which they are using. The capitalist system has in view to obtain profit from renting, but the Islamic System, based on Șaria, forbids renting “haram” assets and services, obtaining interest from renting and using the leasing contract for the transfer of the property.

  14. 76 FR 78500 - Consumer Leasing (Regulation M)

    Science.gov (United States)

    2011-12-19

    ... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1013 [Docket No. CFPB-2011-0026] RIN 3170-AA06 Consumer Leasing (Regulation M) AGENCY: Bureau of Consumer Financial Protection. ACTION: Interim final rule... Protection Act (Dodd-Frank Act) transferred rulemaking authority for a number of consumer financial...

  15. Sample Results From The Interim Salt Disposition Program Macrobatch 7 Tank 21H Qualification Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B.; Washington, A. L. II

    2013-08-08

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 7 for the Interim Salt Disposition Program (ISDP). An ARP and several ESS tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP/MCU. No issues with the projected Salt Batch 7 strategy are identified, other than the presence of visible quantities of dark colored solids. A demonstration of the monosodium titanate (0.2 g/L) removal of strontium and actinides provided acceptable 4 hour average decontamination factors for Pu and Sr of 3.22 and 18.4, respectively. The Four ESS tests also showed acceptable behavior with distribution ratios (D(Cs)) values of 15.96, 57.1, 58.6, and 65.6 for the MCU, cold blend, hot blend, and Next Generation Solvent (NGS), respectively. The predicted value for the MCU solvent was 13.2. Currently, there are no models that would allow a prediction of extraction behavior for the other three solvents. SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed. While no outstanding issues were noted, the presence of solids in the samples should be investigated in future work. It is possible that the solids may represent a potential reservoir of material (such as potassium) that could have an impact on MCU performance if they were to dissolve back into the feed solution. This salt batch is intended to be the first batch to be processed through MCU entirely using the new NGS-MCU solvent.

  16. Solar Leasing Summary, Houston Texas

    Energy Technology Data Exchange (ETDEWEB)

    Hammer, Mary [City of San Antonio, TX (United States)

    2013-02-14

    A relatively new option for homeowners looking to add solar to their home is the solar lease. At present, the solar lease option can be found in California, Arizona, Texas, Colorado, Hawaii, New York and Oregon. The most active companies currently offering solar leases are NRG Energy, Sungevity, Solar City and Sun Run. With the uncertainty and/or lack of subsidies the states participating in these programs have ebbed and flowed over the last few years. However, there is an expectation that in the current market solar leasing will make solar viable without the utility and federal subsidies. NRG Energy is currently testing this expectation in Houston, TX where currently no subsidies or incentives beyond the federal tax incentives, exist. Following is an explanation on the state of solar leasing in Houston, TX and explanation of the current financing options.

  17. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  18. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  19. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  20. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  1. 77 FR 6479 - Leased Commercial Access; Development of Competition and Diversity in Video Programming...

    Science.gov (United States)

    2012-02-08

    ... Commercial Access; Development of Competition and Diversity in Video Programming Distribution and Carriage... contained in the Second Report and Order, FCC 11-119, pertaining to carriage of video programming vendors by multichannel video programming distributors (program carriage rules). This notice is consistent with the Secord...

  2. 76 FR 60651 - Leased Commercial Access; Development of Competition and Diversity in Video Programming...

    Science.gov (United States)

    2011-09-29

    ... programming services seeking access through their conduit.''); H.R. Rep. No. 102-628 (1992), at 41 (``[T]he... Programming Distribution and Carriage; Revision of the Commission's Program Carriage Rules; Final Rule and... Programming Distribution and Carriage AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY...

  3. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  4. Interim site characterization report and ground-water monitoring program for the Hanford site solid waste landfill

    International Nuclear Information System (INIS)

    Fruland, R.M.; Hagan, R.A.; Cline, C.S.; Bates, D.J.; Evans, J.C.; Aaberg, R.L.

    1989-07-01

    Federal and state regulations governing the operation of landfills require utilization of ground-water monitoring systems to determine whether or not landfill operations impact ground water at the point of compliance (ground water beneath the perimeter of the facility). A detection-level ground-water monitoring system was designed, installed, and initiated at the Hanford Site Solid Waste Landfill (SWL). Chlorinated hydrocarbons were detected at the beginning of the ground-water monitoring program and continue to be detected more than 1 year later. The most probable source of the chlorinated hydrocarbons is washwater discharged to the SWL between 1985 and 1987. This is an interim report and includes data from the characterization work that was performed during well installation in 1987, such as field observations, sediment studies, and geophysical logging results, and data from analyses of ground-water samples collected in 1987 and 1988, such as field parameter measurements and chemical analyses. 38 refs., 27 figs., 8 tabs

  5. Impact of end of lease contracts’ option on joint pricing and inventory decisions of remanufacturable leased products

    Directory of Open Access Journals (Sweden)

    M. Rabbani

    2016-04-01

    Full Text Available Leasing currently plays an important role for the global economy. The equipment leasing earning acquired through leasing rather than cash or credit, has reached a dominant level. With this regards, this paper represents a basic mixed-integer non-linear programming model. The study deliberates a firm that leases new products and remanufactured leased merchandises. The proposed study considers the end of lease contract, which contains several options: Return the leased product, return the used product and purchase other remanufactured product and buying the leased product. The primary objective is to maximize the discrepancy between the revenue and the costs of a firm, which leases new products as well as selling remanufactured ones. The product deteriorates with time and the difference between a new and used good is obvious. The product must undergo a remanufacturing procedure before being sold as a remanufactured product.

  6. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    International Nuclear Information System (INIS)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole

  7. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  8. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  9. The NASA cosmic ray program for the 1990's and beyond Interim report of the NASA Cosmic Ray Program Working Group

    International Nuclear Information System (INIS)

    Ahlen, S.P.; Binns, W.R.; Cherry, M.L.; Gaisser, T.K.; Jones, W.V.; Ling, J.C.; Mewaldt, R.A.; Muller, D.; Ormes, J.O.; Ramaty, R.; Stone, E.C.; Waddington, C.J.; Webber, W.R.; Miedenbeck, M.E.

    1990-01-01

    The interim report of the 1989 NASA Cosmic Ray Program Working Group is presented. The report summarizes the cosmic ray program for the 1990's, including the recently approved ACE, Astromag, HNC, POEMS, and SAMPEX missions, as well as other key elements of the program. New science themes and candidate missions are identified for the first part of the 21st Century, including objectives that might be addressed as part of the Human Exploration Initiative. Among the suggested new thrusts for the 21st century are: an Interstellar Probe into the nearby interstellar medium; a Lunar-Based Calorimeter to measure the cosmic ray composition near ∼10 16 eV; high precision element and isotope spectroscopy of ultraheavy (Z≥30) elements; and new, more sensitive, studies of impulsive solar flare events

  10. Indiana application for interim authorization, phase I, hazardous waste management program--Environmental Protection Agency. Notice of public hearing and public comment period.

    Science.gov (United States)

    1982-04-12

    EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.

  11. 13 CFR 120.870 - Leasing Project Property.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Leasing Project Property. 120.870... Company Loan Program (504) Leasing Policies Specific to 504 Loans § 120.870 Leasing Project Property. (a... recorded lien against the leasehold estate and other collateral as necessary. (b) If the Project is for new...

  12. Rethinking the Buy vs. Lease Decision

    Science.gov (United States)

    2014-07-01

    Navy! Navy! SSN 721! 16! 44! 60! Navy! Navy! SSN 722! 23! 50! 73! Navy! Navy! CG 50! 18! 33! 51! Navy! Navy! CG 51! 27! 36! 63! Navy! Navy! FEG 57! 20...United States and Canada , FedEx operates FedEx Feeder on a damp lease program; the contractor leases the aircraft from FedEx fleet and provides a crew

  13. Truth in Leasing.

    Science.gov (United States)

    Board of Governors of the Federal Reserve System, Washington, DC.

    Designed for the general public and possibly suitable also for high school economics students, this pamphlet discusses the Consumer Leasing Act. The act requires leasing companies to inform consumers of the costs and terms of their contracts, limits any extra payments at the end of a lease, and regulates lease advertising. The pamphlet focuses on…

  14. 77 FR 32015 - Revision to the Section 8 Management Assessment Program Lease-Up Indicator

    Science.gov (United States)

    2012-05-31

    ... the HCV program and programmatic inefficiency. To eliminate such complexity, and reduce inefficiency... many HCVs, so the PHA may need to hold turnover HCVs so they will be available to assist new PBV... created after SEMAP began) have separate procedures or requirements that reduce the PHA's control over...

  15. 7 CFR 767.102 - Leasing non-real estate inventory property.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Leasing non-real estate inventory property. 767.102..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS INVENTORY PROPERTY MANAGEMENT Lease of Real Estate Inventory Property § 767.102 Leasing non-real estate inventory property. The Agency does not lease non-real estate...

  16. Radioactivity standards distribution program, 1978--1979. Interim report, 1978--1979

    International Nuclear Information System (INIS)

    Ziegler, L.H.

    1978-06-01

    A program for the distribution of calibrated radioactive samples, as one function of EPA's quality assurance program for environmental radiation measurements, is described. Included is a discussion of the objectives of the distribution program and a description of the preparation, availability, and distribution of calibrated radioactive samples. Instructions and application forms are included for laboratories desiring to participate in the program. This document is not a research report. It is designed for use by personnel of laboratories participating or desiring to participate in the Radioactivity Standards Distribution Program, which is a part of the U.S. Environmental Protection Agency's quality assurance program

  17. Maywood Interim Storage Site: Annual site environmental report, Maywood, New Jersey, Calendar year 1986: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. The MISS is presently used for the storage of low-level radioactively contaminated soils. The MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring programs are being conducted at this site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/y) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/y. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (due to greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 16 refs., 8 figs., 15 tabs.

  18. DEVELOPMENT OF THERAPEUTIC STRATEGIES FOR OBESITY AND COMORBID DISORDERS BASED ON OBSERVATIONAL PROGRAMS: INTERIM RESULTS OF THE RUSSIAN OBSERVATIONAL PROGRAM PRIMAVERA

    Directory of Open Access Journals (Sweden)

    E. A. Troshina

    2015-01-01

    Full Text Available Aim: To assess interim results of the Russian observational program PrimaVera on efficacy and safety sibutramine (Reduxin® for treatment of obesity within routine medical practice. Materials and methods: This multicenter observational program included patients with obesity aged below 65  years, excluding those with uncontrolled arterial hypertension, coronary heart disease, heart failure and cerebrovascular disease. All patients were administered sibutramine for treatment of their obesity. During out-patient follow-up visits, physicians assessed changes in patients’ body mass, blood pressure and heart rate, as well as registered adverse events. Maximal treatment duration was 12 months. In this report, the results from 16  515  patients are analyzed, 82% of whom (n=13 192 were females.Results: After 3  months of treatment body mass index (BMI decreased by 2.81±1.0  kg/m², after 6 months, by 5.17±2.15 kg/m². At 12 months decrease in BMI was 1.3-fold higher compared to 6  months’ results and amounted to 6.76±2.93  kg/m². Reduction of body mass with longterm (above 6  months treatment with sibutramine under supervision of a physician was associated with a decrease in systolic and diastolic blood pressure levels (by 4.1 mm Hg, in both cases and did not lead to an increase in heart rate (Δ=-1.02  bpm. Based on data from 16  515  medical records processed up to now, 397  episodes of adverse events were registered, with none of them being serious.Conclusion: This interim results of the program PrimaVera confirmed favorable safety profile of Reduxin® and its high efficacy in the treatment of obesity.

  19. Leasing research

    Directory of Open Access Journals (Sweden)

    Pedro Franco

    2015-09-01

    Full Text Available En agosto de 2010, La International Accounting Standards Board (IASB y Financial AccountingStandards Board (FASB presentó un proyecto que propone un nuevo modelo de tratamientocontable para el arrendamiento. El propósito principal del Discussion Paper: Leases PreliminaryViews 2009 y el Exposure Draft: Leases 2010, emitidos conjuntamente por IASB y FASB, esla unificación en la presentación y tratamiento contable de la información financiera delarrendamiento a nivel internacional.Por un lado, la propuesta presentada en el Discussion Paper 2009 modificará los estándares delos arrendamientos e impactará aquellas empresas que utilicen contratos de arrendamientooperativo para sus activos fijos. Esto debido a que, bajo la actual NIC 17, el arrendatario noreconoce todas las obligaciones que genera el arrendamiento y por lo tanto, distorsiona losresultados afectando el proceso de toma de decisiones.Por otro lado, la propuesta del FASB plantea que, en el Estado de Situación Financiera,deben reconocerse los derechos y obligaciones del arrendatario bajo cualquier modelo dearrendamiento. Esto significará que se reconocerá un activo por el arrendamiento1 y un pasivopor los pagos futuros2. Asimismo la contabilidad del arrendador también se verá afectada, yaque la propuesta sugiere que el arrendador escoja entre dos modelos contables, los cualesdependen de la transferencia de riesgos y beneficios al momento de realizar el contrato dearrendamiento. Por lo tanto, la presente investigación tiene comoobjetivo analizar los impactos y dificultades de lanueva propuesta. Para esto se tendrán en cuentatanto la perspectiva de los arrendadores comode los arrendatarios.

  20. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-26

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.

  1. Interim salt disposition program macrobatch 6 tank 21H qualification monosodium titanate and cesium mass transfer tests

    Energy Technology Data Exchange (ETDEWEB)

    Washington, A. L. II; Peters, T. B.; Fink, S. D.

    2013-02-25

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Interim Salt Disposition Program (ISDP) Batch 6 processing. This qualification material was a set of six samples from Tank 21H in October 2012. This sample was used as a real waste demonstration of the Actinide Removal Process (ARP) and the Extraction-Scrub-Strip (ESS) tests process. The Tank 21H sample was contacted with a reduced amount (0.2 g/L) of MST and characterized for strontium and actinide removal at 0 and 8 hour time intervals in this salt batch. {sup 237}Np and {sup 243}Am were both observed to be below detection limits in the source material, and so these results are not reported in this report. The plutonium and uranium samples had decontamination factor (DF) values that were on par or slightly better than we expected from Batch 5. The strontium DF values are slightly lower than expected but still in an acceptable range. The Extraction, Scrub, and Strip (ESS) testing demonstrated cesium removal, stripping and scrubbing within the acceptable range. Overall, the testing indicated that cesium removal is comparable to prior batches at MCU.

  2. Spent fuel sabotage test program, characterization of aerosol dispersal : interim final report

    International Nuclear Information System (INIS)

    Gregson, Michael Warren; Brockmann, John E.; Loiseau, Olivier; Klennert, Lindsay A.; Nolte, Oliver; Molecke, Martin Alan; Autrusson, Bruno A.; Koch, Wolfgang; Pretzsch, Gunter Guido; Brucher, Wenzel; Steyskal, Michele D.

    2008-01-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program provides source-term data that are relevant to plausible sabotage scenarios in relation to spent fuel transport and storage casks and associated risk assessments. We present details and significant results obtained from this program from 2001 through 2007. Measured aerosol results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; measurements of volatile fission product species enhanced sorption--enrichment factors onto respirable particles; and, status on determination of the spent fuel ratio, SFR, needed for scaling studies. Emphasis is provided on recent Phase 3 tests using depleted uranium oxide pellets plus non-radioactive fission product dopants in surrogate spent fuel test rodlets, plus the latest surrogate cerium oxide results and aerosol laboratory supporting calibration work. The DUO 2 , CeO 2 , plus fission product dopant aerosol particle results are compared with available historical data. We also provide a status review on continuing preparations for the final Phase 4 in this program, tests using individual short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. The source-term data, aerosol results, and program design have been tailored to support and guide follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments. This spent fuel sabotage, aerosol test program was performed primarily at Sandia National Laboratories, with support provided by both the U.S. Department of Energy and the Nuclear Regulatory Commission. This program has significant input from, and is cooperatively supported and

  3. Low-level waste management program and interim waste operations technologies

    International Nuclear Information System (INIS)

    Mezga, L.J.

    1983-01-01

    The Department of Energy currently supports an integrated technology development and transfer program aimed at ensuring that the technology necessary for the safe management and disposal of LLW by the commercial and defense sectors is available. The program focuses on five technical areas: (1) corrective measures technology, (2) improved shallow land burial technology, (3) greater confinement disposal technology, (4) model development and validation, and (5) treatment methods for problem wastes. The results of activities in these areas are reported in the open literature and the Proceedings of the LLWMP Annual Participants Information Meeting

  4. Spent fuel sabotage test program, characterization of aerosol dispersal : interim final report.

    Energy Technology Data Exchange (ETDEWEB)

    Gregson, Michael Warren; Brockmann, John E.; Loiseau, Olivier (Institut de Radioprotection et de Surete Nucleaire, France); Klennert, Lindsay A.; Nolte, Oliver (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Molecke, Martin Alan; Autrusson, Bruno A. (Institut de Radioprotection et de Surete Nucleaire, France); Koch, Wolfgang (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Pretzsch, Gunter Guido (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Brucher, Wenzel (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Steyskal, Michele D.

    2008-03-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program provides source-term data that are relevant to plausible sabotage scenarios in relation to spent fuel transport and storage casks and associated risk assessments. We present details and significant results obtained from this program from 2001 through 2007. Measured aerosol results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; measurements of volatile fission product species enhanced sorption--enrichment factors onto respirable particles; and, status on determination of the spent fuel ratio, SFR, needed for scaling studies. Emphasis is provided on recent Phase 3 tests using depleted uranium oxide pellets plus non-radioactive fission product dopants in surrogate spent fuel test rodlets, plus the latest surrogate cerium oxide results and aerosol laboratory supporting calibration work. The DUO{sub 2}, CeO{sub 2}, plus fission product dopant aerosol particle results are compared with available historical data. We also provide a status review on continuing preparations for the final Phase 4 in this program, tests using individual short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. The source-term data, aerosol results, and program design have been tailored to support and guide follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments. This spent fuel sabotage, aerosol test program was performed primarily at Sandia National Laboratories, with support provided by both the U.S. Department of Energy and the Nuclear Regulatory Commission. This program has significant input from, and is cooperatively

  5. A Guide for Planning Facilities for Occupational Preparation Programs in Metallurgy Technology. Interim Report. Research 28.

    Science.gov (United States)

    German, Carl, Jr.

    The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…

  6. THE INTERIM RESULTS AND THE WAYS TO IMPLEMENT THE PROGRAMS TEACHER TRAINING IN NETWORK FORM

    Directory of Open Access Journals (Sweden)

    A. A. Tolsteneva

    2016-01-01

    Full Text Available The paper presents the results of approbation of new modules primary educational undergraduate specialties Group expanded education and pedagogy (training areas-economics, involving academic mobility of students of universities in terms of networking of Novosibirsk and Nizhny Novgorod pedagogical universities. The article describes the structure of established affiliate networks, conducted pedagogical and methodical analysis modules have passed testing, recommendations for improvement and suggested ways for the development of a modular approach to building educational programs in teacher education system. The implementation of educational modules require their integration into the curricula of the Nizhny Novgorod State Pedagogical University, with no loss of content, giving the existing curriculum structure saturation. Thus, it was achieved 100% consistency of curriculum, opening further opportunities for the implementation of educational programs in terms of networking.

  7. Mixed Waste Integrated Program interim evaluation report on thermal treatment technologies

    International Nuclear Information System (INIS)

    Gillins, R.L.; DeWitt, L.M.; Wollerman, A.L.

    1993-02-01

    The Mixed Waste Integrated Program (MWIP) is one of several US Department of Energy (DOE) integrated programs established to organize and coordinate throughout the DOE complex the development of technologies for treatment of specific waste categories. The goal of the MWIP is to develop and deploy appropriate technologies for -the treatment of DOE mixed low-level and alpha-contaminated wastes in order to bring all affected DOE installations and projects into compliance with environmental laws. Evaluation of treatment technologies by the MWIP will focus on meeting waste form performance requirements for disposal. Thermal treatment technologies were an early emphasis for the MWIP because thermal treatment is indicated (or mandated) for many of the hazardous constituents in DOE mixed waste and because these technologies have been widely investigated for these applications. An advisory group, the Thermal Treatment Working Group (TTWG), was formed during the program's infancy to assist the MWIP in evaluating and prioritizing thermal treatment technologies suitable for development. The results of the overall evaluation scoring indicate that the four highest-rated technologies were rotary kilns, slagging kilns, electric-arc furnaces, and plasma-arc furnaces. The four highest-rated technologies were all judged to be applicable on five of the six waste streams and are the only technologies in the evaluation with this distinction. Conclusions as to the superiority of one technology over others are not valid based on this preliminary study, although some general conclusions can be drawn

  8. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    International Nuclear Information System (INIS)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants

  9. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants.

  10. Cancer early detection program based on awareness and clinical breast examination: Interim results from an urban community in Mumbai, India.

    Science.gov (United States)

    Gadgil, Anita; Sauvaget, Catherine; Roy, Nobhojit; Muwonge, Richard; Kantharia, Surita; Chakrabarty, Anuradha; Bantwal, Kanchan; Haldar, Indrani; Sankaranarayanan, Rengaswamy

    2017-02-01

    Indian women with breast cancer are usually diagnosed in advanced stages leading to poor survival. Improving breast awareness and increasing access to early diagnosis and adequate treatment has been advocated for breast cancer control. We implemented a program to increase awareness on breast cancer and access to its early detection in an occupational health care scheme in Mumbai, India. Breast awareness brochures were mailed annually between June 2013 and June 2016 to a cohort of 22,500 eligible women aged 30-69 years old receiving universal health care from an occupational health care scheme comprising of primary health centres and a referral secondary care hospital in Mumbai. Women with suspected breast cancers were provided with diagnostic investigations and treatment. Socio-demographic information and tumour characteristics were compared between the breast awareness pre-intervention period (Jan 2005-May 2013) and the breast awareness intervention period after four rounds of mailers (June 2013-June 2016). The proportion of women with early tumours and axillary lymph node negative cancers increased from 74% to 81% and 46% to 53% respectively, between the two periods. While the proportion of patients receiving breast conserving surgery increased from 39% to 51%, the proportion receiving chemotherapy decreased from 84% to 56%. Interim results following efforts to improve breast awareness and access to care in a cohort of women in an occupational health care scheme indicate early detection and more conservative treatment of breast cancers. Creating awareness and improving access to care may result in cancer down-staging. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  12. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  13. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    International Nuclear Information System (INIS)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991

  14. Leasing nemovitostí

    OpenAIRE

    BRONCOVÁ, Jana

    2010-01-01

    The main aim of this bachelor´s thesis is to offer closer look at not very well known form of property financing called property leasing. The thesis is divided into two main parts. The first part is focused on basic characteristics of leasing i.e. subject of leasing, forms of financing, advantages and disadvantages. The second part includes the definition of property leasing and subsequent terms. Property leasing development in the Czech Republic from 2000 to 2009 is also included. The thesis...

  15. Gas reactor international cooperative program interim report: German Pebble Bed Reactor design and technology review

    International Nuclear Information System (INIS)

    1978-09-01

    This report describes and evaluates several gas-cooled reactor plant concepts under development within the Federal Republic of Germany (FRG). The concepts, based upon the use of a proven Pebble Bed Reactor (PBR) fuel element design, include nuclear heat generation for chemical processes and electrical power generation. Processes under consideration for the nuclear process heat plant (PNP) include hydrogasification of coal, steam gasification of coal, combined process, and long-distance chemical heat transportation. The electric plant emphasized in the report is the steam turbine cycle (HTR-K), although the gas turbine cycle (HHT) is also discussed. The study is a detailed description and evaluation of the nuclear portion of the various plants. The general conclusions are that the PBR technology is sound and that the HTR-K and PNP plant concepts appear to be achievable through appropriate continuing development programs, most of which are either under way or planned

  16. Fusion magnet safety studies program: superconducting magnet protection system and failure. Interim report

    International Nuclear Information System (INIS)

    Allinger, J.; Danby, G.; Hsieh, S.Y.; Keane, J.; Powell, J.; Prodell, A.

    1975-11-01

    This report includes the first two quarters study of available information on schemes for protecting superconducting magnets. These schemes can be divided into two different categories. The first category deals with the detection of faulty regions (or normal regions) in the magnet. The second category relates to the protection of the magnet when a fault is detected, and the derived signal which can be used to activate a safety system (or energy removal system). The general detection and protection methods are first described briefly and then followed by a survey of the protection systems used by different laboratories for various magnets. A survey of the cause of the magnet difficulties or failures is also included. A preliminary discussion of these protection schemes and the experimental development of this program is given

  17. Crusader Automated Docking System: Technology support for the Crusader Resupply Team. Interim report, Ammunition Logistics Program

    Energy Technology Data Exchange (ETDEWEB)

    Kring, C.T.; Varma, V.K.; Jatko, W.B.

    1995-11-01

    The US Army and Team Crusader (United Defense, Lockheed Martin Armament Systems, etc.) are developing the next generation howitzer, the Crusader. The development program includes an advanced, self-propelled liquid propellant howitzer and a companion resupply vehicle. The resupply vehicle is intended to rendezvous with the howitzer near the battlefront and replenish ammunition, fuel, and other material. The Army has recommended that Crusader incorporate new and innovative technologies to improve performance and safety. One conceptual design proposes a robotic resupply boom on the resupply vehicle to upload supplies to the howitzer. The resupply boom would normally be retracted inside the resupply vehicle during transit. When the two vehicles are within range of the resupply boom, the boom would be extended to a receiving port on the howitzer. In order to reduce exposure to small arms fire or nuclear, biological, and chemical hazards, the crew would remain inside the resupply vehicle during the resupply operation. The process of extending the boom and linking with the receiving port is called docking. A boom operator would be designated to maneuver the boom into contact with the receiving port using a mechanical joystick. The docking operation depends greatly upon the skill of the boom operator to manipulate the boom into docking position. Computer simulations at the National Aeronautics and Space Administration have shown that computer-assisted or autonomous docking can improve the ability of the operator to dock safely and quickly. This document describes the present status of the Crusader Autonomous Docking System (CADS) implemented at Oak Ridge National laboratory (ORNL). The purpose of the CADS project is to determine the feasibility and performance limitations of vision systems to satisfy the autonomous docking requirements for Crusader and conduct a demonstration under controlled conditions.

  18. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix B - system descriptions and fault trees

    International Nuclear Information System (INIS)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.; Trainer, J.E.; Bertucio, R.C.; Leahy, T.J.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models and probabilities; and generic control circuit analyses

  19. Full Service Leasing

    OpenAIRE

    Richter, Ján

    2009-01-01

    Aim of this master thesis is to describe the service of Full Service Leasing, as a modern form of financing and management of assets, primarily automobile fleet. Description of full service leasing is designed as a comprehensive and complete guide to support reader's position when deciding to finance and manage a fleet by this service. Whether the reader is an entrepreneur, CFO, fleet manager, new employee of leasing company, or anyone who is interested in this service, this master thesis wil...

  20. Nuclear fuel lease accounting

    International Nuclear Information System (INIS)

    Danielson, A.H.

    1986-01-01

    The subject of nuclear fuel lease accounting is a controversial one that has received much attention over the years. This has occurred during a period when increasing numbers of utilities, seeking alternatives to traditional financing methods, have turned to leasing their nuclear fuel inventories. The purpose of this paper is to examine the current accounting treatment of nuclear fuel leases as prescribed by the Financial Accounting Standards Board (FASB) and the Federal Energy Regulatory Commission's (FERC's) Uniform System of Accounts. Cost accounting for leased nuclear fuel during the fuel cycle is also discussed

  1. Telecom infrastructure leasing

    International Nuclear Information System (INIS)

    Henley, R.

    1995-01-01

    Slides to accompany a discussion about leasing telecommunications infrastructure, including radio/microwave tower space, radio control buildings, paging systems and communications circuits, were presented. The structure of Alberta Power Limited was described within the ATCO group of companies. Corporate goals and management practices and priorities were summarized. Lessons and experiences in the infrastructure leasing business were reviewed

  2. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Date Report No. 3: Diesel Fuel Sulfur Effects on Particulate Matter Emissions

    Energy Technology Data Exchange (ETDEWEB)

    DOE; ORNL; NREL; EMA; MECA

    1999-11-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim report covers the effects of diesel fuel sulfur level on particulate matter emissions for four technologies.

  3. 7 CFR 767.103 - Managing leased real estate inventory property.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Managing leased real estate inventory property. 767... AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS INVENTORY PROPERTY MANAGEMENT Lease of Real Estate Inventory Property § 767.103 Managing leased real estate inventory property. (a) The Agency will pay for...

  4. 47 CFR 76.971 - Commercial leased access terms and conditions.

    Science.gov (United States)

    2010-10-01

    ... operators that have not satisfied their statutory leased access requirements shall accommodate part-time..., educational and governmental access programming, provided that the operator's franchise agreement requires it... leased commercial channels. Cable operators may impose reasonable insurance requirements on leased access...

  5. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  6. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

  7. 47 CFR 76.977 - Minority and educational programming used in lieu of designated commercial leased access capacity.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Minority and educational programming used in... Cable Rate Regulation § 76.977 Minority and educational programming used in lieu of designated... of programming from a qualified minority programming source or from any qualified educational...

  8. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.

  9. Innovations in Funding the Maritime Prepositioning Ships Program - A Case Analysis of the How and Why the Lease Option was Successful

    National Research Council Canada - National Science Library

    Bailey, John

    2004-01-01

    ... and equipment in strategic areas of the world. It will explain why the lease option was eventually approved when initially so many participants in the decision-making process objected to this type of financing for shipbuilding...

  10. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.

  11. THE OBJECT OF LEASING OPERATIONS

    Directory of Open Access Journals (Sweden)

    Raluca Antoanetta TOMESCU

    2017-05-01

    Full Text Available The leasing operation according to article 1, paragraph (2 of Government Ordinance 51/1997 covers movable or immovable property by their nature or which become movable by destination and by the definition of the leasing operation that the legislator offers in the same law, the leasing operation appears to be reduced to signing a lease agreement. But as practice proves, and recognized by part of the legal doctrine, leasing operations cannot be reduced only to the conclusion of the lease agreement. If the lease agreement represents the materialization of the will of the parties (lender and user, it is fact only a stage (final stage of several operations that precede and accompany the leasing operations along their development. It is recognized in the doctrine that within the leasing operations we have a sequence of operations and contracts without which the final act, namely the lease agreement would not exist. We are referring to the sale-purchase contract signed by the financier with the supplier of goods, the mandate contract of the financier concluded with the user and the actual funding contract, the last two coexisting in the wording of the lease agreement. Through the study developed, we aimed to individualize concretely the specific subject of each of these legal operations, with the intention of consolidate the own identity of the lease agreement and of the leasing operations implicitly.

  12. New Trends in Leasing Accounting

    Directory of Open Access Journals (Sweden)

    Nicolae Traian Cristin

    2017-01-01

    An entity shall apply IFRS 16 Leasing contracts for annual periods beginning on or after 1 January 2019. IFRS 16 sets out the principles for the recognition, measurement, presentation and disclosure for accountimg of the leases. The objective is to ensure that leasing companies and locators provide relevant information in a way that accurately represents those transactions. Based on this information, users of financial statements can assess the effect that leases have on an entity's financial position, financial performance and cash flows.

  13. 75 FR 78632 - Consumer Leasing

    Science.gov (United States)

    2010-12-16

    ... The new threshold for exempt consumer leases in the CLA goes into effect on July 21, 2011. Accordingly... and 213.4) and when the availability of consumer leases on particular terms is advertised (Sec. 213.7... regulation also contain rules about advertising consumer leases. The information collection pursuant to...

  14. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  15. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  16. Mobile dental units: leasing or buying? A dollar-cost analysis.

    Science.gov (United States)

    Arevalo, Oscar; Saman, Daniel M; Bonaime, Alice; Skelton, Judy

    2010-01-01

    The decision to acquire a mobile dental unit is based on a standard capital budgeting analysis. The next step is to determine whether to obtain the use of the mobile dental unit by borrowing and purchasing or by leasing. As a financing mechanism, leases are simply another way of borrowing money to pay for the asset. To compare lease vs. debt as financial vehicles to acquiring a mobile dental unit. An estimate for a new mobile unit was obtained. Lease and loan proposals from financial lenders were collected. A cost of capital rate was chosen for comparison. Cash flows associated with borrowing and leasing vs. buying were determined fortwo different scenarios: for profit (FP) vs. not-for-profit (NFP), at 5 years. A dollar-cost analysis was utilized to determine the option with the lowest capitalized value. There was a net advantage to buying vs. leasing for both for FP and NFP organizations. Due to tax advantages, owning and leasing were substantially less expensive for FP than for NFP. Slight decreases in the monthly lease payments would make leasing competitive to the buying approach. Exploring alternative financing vehicles may allow dental programs to expand their services through the acquisition of a mobile unit. Though programs generally own assets, it is the use of the asset which is important rather than the ownership. Dental programs can find leasing an attractive alternative by offering access to capital with cash-flow advantages.

  17. PERPETUAL LEASE: FEATURES OF ACCOUNTING

    Directory of Open Access Journals (Sweden)

    Tetiana Yurchenko

    2017-03-01

    Full Text Available The article namely deals with the peculiarities of legal regulation of the right to use someone else's land for agricultural purposes under the perpetual lease contract. Recognition of the legitimacy of perpetual lease as an intangible asset and, therefore, the object of accounting was justified. The features of the primary account perpetual lease rights were analyzed. It was found that for documenting transactions receipt, commissioning, de-recognition perpetual lease specialized forms of primary documents is not installed. The main aspects of accounting reflection of land under perpetual lease contracts were identified and ways of their improving were developed. The period on which the land is transferred for use under perpetual lease contract was proposed. During the study, general scientific methods – induction, deduction, synthesis, analysis, dialectical, historical, generalizations and specific methods of accounting – documentation, evaluation, accounting records were used. Keywords: accounting, land, perpetual lease, intangible assets, the right to use.

  18. new lease accounting and health care.

    Science.gov (United States)

    Berman, Mindy

    2016-05-01

    Recently released lease accounting standards from the Financial Accounting Standards Board (FASB) present three significant challenges for healthcare organizations: All leases must be reported on a company's balance sheet, increasing liabilities on the balance sheets of healthcare organizations considerably. Contractual agreements not previously considered leases will now be treated as leases. Classification of some equipment leases could change.

  19. Oil-Spill Analysis: Gulf of Mexico Outer Continental Shelf (OCS) Lease Sales, Eastern Planning Area, 2003-2007 and Gulfwide OCS Program, 2003-2042

    Science.gov (United States)

    2002-09-01

    The Federal Government plans to offer U.S. Outer Continental Shelf (OCS) lands in the Eastern Planning Area of the Gulf of Mexico (GOM) for oil and gas leasing. This report summarizes results of that analysis, the objective of which was to estimate the risk of oil-spill contact to sensitive offshore and onshore environmental resources and socioeconomic features from oil spills accidentally occurring from the OCS activities.

  20. Advantages and disadvantages of leasing

    Directory of Open Access Journals (Sweden)

    Katarzyna Wiśniewska

    2012-12-01

    Full Text Available The article is systematization of knowledge on leasing as a source of financing for enterprises. This paper defines the leasing and presented its nature according to the norms of civil, tax and accounting law. It shows the basic classification of leases and briefly describes each type. This article discusses the key benefits gained from using the financial tools and the most common business problems. Presented the consequences arising from the signing of the lease. Description was written based on literature studies on the issues of lease. Concerns the benefits and drawbacks arising from the lease agreement for use of this form of financing for enterprises. The article can help entrepreneurs in making the correct choice of the method of financing.

  1. Impacts of the Interim Federal Health Program reforms: A stakeholder analysis of barriers to health care access and provision for refugees.

    Science.gov (United States)

    Antonipillai, Valentina; Baumann, Andrea; Hunter, Andrea; Wahoush, Olive; O'Shea, Timothy

    2017-11-09

    Changes to the Interim Federal Health Program (IFHP) in 2012 reduced health care access for refugees and refugee claimants, generating concerns among key stakeholders. In 2014, a new IFHP temporarily reinstated access to some health services; however, little is known about these changes, and more information is needed to map the IFHP's impact. This study explores barriers occurring during the time period of the IFHP reforms to health care access and provision for refugees. A stakeholder analysis, using 23 semi-structured interviews, was conducted to obtain insight into stakeholder perceptions of the 2014 reforms, as well as stakeholders' position and their influence to assess the acceptability of the IFHP changes. The majority of stakeholders expressed concerns about the 2014 IFHP changes as a result of the continuing barriers posed by the 2012 retrenchments and the emergence of new barriers to health care access and provision for refugees. Key barriers identified included lack of communication and awareness, lack of continuity and comprehensive care, negative political discourse and increased costs. A few stakeholders supported the reforms as they represented some, but limited, access to health care. Overall, the reforms to the IFHP in 2014 generated barriers to health care access and provision that contributed to confusion among stakeholders, the transfer of refugee health responsibility to provincial authorities and the likelihood of increased health outcome disparities, as refugees and refugee claimants chose to delay seeking health care. The study recommends that policy-makers engage with refugee health stakeholders to formulate a policy that improves health care provision and access for refugee populations.

  2. 76 FR 35721 - Consumer Leasing

    Science.gov (United States)

    2011-06-20

    ... 213 Advertising, Consumer leasing, Consumer protection, Federal Reserve System, Reporting and... contains regulatory documents #0;having general applicability and legal effect, most of which are keyed #0...

  3. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    International Nuclear Information System (INIS)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization's objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture

  4. Leasing of nuclear installations

    International Nuclear Information System (INIS)

    Capaccioli, Enzo.

    1977-01-01

    The high costs to be borne in industrialised countries for expanding nuclear programmes make leasing, in terms of funding, an attractive proposition even in times of recession. This system is advantageous to both parties: the bodies providing funds make substantial profits without untoward risk, given the internationally-recognised regime of channelling liability onto the nuclear operator and because such contracts usually provide that ownership of the property involved will eventually be transferred to the operator. The latter obtains the sums needed by a simple, speedy procedure enabling him to start operations more quickly than if he had to seek funds by a more conventional method. The problem in Italy is that nuclear electricity generating plants are a State monopoly while leasing is a private enterprise. The Italian 1975 Siting Act provides a consultation procedure of regional and State authorities, with the ultimate decision taken by the latter. To maintain the momentum, arrangements could be made for leasing, before starting the licensing procedure proper according to the Act. (NEA) [fr

  5. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  6. MMS trims proposed schedule for OCS oil and gas lease sales

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the U.S. Interior Department has proposed only 18 Outer Continental Shelf oil and gas lease sales in its new 5 year schedule. Eleven of the sales are in the Gulf of Mexico, one off the east Coast, none off the West Coast, and six off Alaska. Congress has 60 days in which to reject the 5 year lease sale plan but is not expected to. An earlier draft plan called for 23 sales. The Minerals Management Service, which administers the offshore leasing program, the the new schedule emphasizes leasing of gas prone areas

  7. Hazelwood Interim Storage Site, Hazelwood, Missouri: Annual site environmental report, Calendar year 1987: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1988-04-01

    The monitoring program at the HISS measures radon concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual at the HISS would receive an annual external exposure approximately equivalent to 1 percent of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the HISS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. The results of 1987 monitoring show that the HISS is in compliance with the DOE radiation protection standard. 12 refs., 6 figs., 11 tabs

  8. A comprehensive program to develop correlations for the physical properties of Kraft black liquor. Interim report No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, A.L.

    1990-12-01

    Experimental effort for the program to evaluate physical properties of kraft black liquors is now proceeding well. Experimental work includes pulping, liquor analysis, lignin purification and characterization, vapor-liquid equilibria, heat capacity, heats of solution and combustion, and viscosity measurements. Measurement of thermal conductivity has not yet begun. Collection of the data necessary for development of generalized correlations is proceeding, but will require about two more years. The digester is operating very well. It is now possible to operate the digester as a closed, rotating reactor or as a batch reactor with liquor circulation. When operated with liquor circulation, temperatures within the chip bed can be monitored during cooking. Cooking is reproducible, and cooks are being performed to produce liquors for experimental studies. The digester could be further modified to permit us to conduct rapid exchange batch pulping or to permit us to simulate continuous pulping. Liquors to be used in experimental studies are concentrated in our large scale evaporator or in our small scale evaporator. The large scale evaporator is used to concentrate liquors to about 50% solids for storage and for use in studies requiring high solids liquors. The small scale evaporator is used for preparing final samples to as high as 85% solids and for measuring vapor-liquid equilibria. Liquors are now routinely analyzed to determine all components, except higher molecular weight organic acids and extractives. Lignin determination by uv-visible means has been improved. Lignin purification from black liquor has been improved and lignin molecular weights are determined routinely. Work on lignin molecular weight distribution is still not satisfactory, but recent developments holds promise.

  9. Teaching Ethics with Apartment Leases.

    Science.gov (United States)

    Pomerenke, Paula J.

    1998-01-01

    Describes an assignment in a corporate-communications class in which students examine the design and the language of their apartment leases. Discusses how this assignment teaches students about the Plain English laws and the need for plain English in leases and in ethics. (SR)

  10. 12 CFR 714.3 - Must you own the leased property in an indirect leasing arrangement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Must you own the leased property in an indirect leasing arrangement? 714.3 Section 714.3 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS LEASING § 714.3 Must you own the leased property in an indirect leasing...

  11. LEASING AS IMPORTANT TOOL OF AIRLINE FINANCING

    Directory of Open Access Journals (Sweden)

    V. G. Afanasiev

    2014-01-01

    Full Text Available The article corers current state of airline financing using such instrument as aviation leasing indifferent forms, such as finance leasing its different forms, operational leasing and its different types, sale and lease back analyzed all pluses and minuses of each form. The main questions of Capetown Convention on international warranties concerning moving equipment also discussed.

  12. BLM Colorado Oil Shale Leases

    Data.gov (United States)

    Department of the Interior — KMZ file Format –This data set contains the Oil Shale Leases for the State of Colorado, derived from Legal Land Descriptions (LLD) contained in the US Bureau of Land...

  13. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  14. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  15. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  16. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  17. 78 FR 49079 - Lease Modifications, Lease and Logical Mining Unit Diligence, Advance Royalty, Royalty Rates, and...

    Science.gov (United States)

    2013-08-12

    ... Management 43 CFR Parts 3000, 3400, 3430, et al. Lease Modifications, Lease and Logical Mining Unit Diligence... Lease Modifications, Lease and Logical Mining Unit Diligence, Advance Royalty, Royalty Rates, and Bonds... producing coal and has achieved diligence; (3) the value of any unpaid bonus payments; and (4) 100 percent...

  18. Inventory of Owned and Leased Properties (IOLP)

    Data.gov (United States)

    General Services Administration — The Inventory of Owned and Leased Properties (IOLP) allows users to search properties owned and leased by the General Services Administration (GSA) across the United...

  19. 77 FR 69735 - Consumer Leasing (Regulation M)

    Science.gov (United States)

    2012-11-21

    ... Part 213 Advertising, Consumer leasing, Consumer protection, Federal Reserve System, Reporting and recordkeeping requirements. 12 CFR Part 1013 Advertising, Consumer leasing, Reporting and recordkeeping... contains regulatory documents #0;having general applicability and legal effect, most of which are keyed #0...

  20. Operating-Lease Disclosures: an empirical investigation

    OpenAIRE

    Lückerath-Rovers, Mijntje

    2007-01-01

    textabstractIn 2008, the International Accounting Standards Board (IASB), in cooperation with the Financial Accounting Standards Board (FASB), will issue a new proposal to change the current accounting regulation with respect to leasing to an alternative approach. This new lease-accounting approach, called the “asset and liability approach”, capitalises all leases on the balance sheet. This contrasts with the current lease-accounting approach, called the “risk and reward approach”, which disc...

  1. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  2. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  3. State child health; revisions to the regulations implementing the State Children's Health Insurance Program. Interim final rule with comment period; revisions, delay of effective date, and technical amendments to final rule.

    Science.gov (United States)

    2001-06-25

    Title XXI authorizes the State Children's Health Insurance Program (SCHIP) to assist State efforts to initiate and expand the provision of child health assistance to uninsured, low-income children. On January 11, 2001 we published a final rule in the Federal Register to implement SCHIP that has not gone into effect. This interim final rule further delays the effective date, revises certain provisions and solicits public comment, and makes technical corrections and clarifications to the January 2001 final rule based on further review of the comments received and applicable law. Only the provisions set forth in this document have changed. All other provisions set forth in the January 2001 final rule will be implemented without change.

  4. Medicare and Medicaid programs; physicians' referrals to health care entities with which they have financial relationships: partial delay of effective date. Interim final rule with comment period; partial delay in effective date.

    Science.gov (United States)

    2001-12-03

    This interim final rule with comment period delays for 1 year the effective date of the last sentence of 42 CFR 411.354(d)(1). Section 411.354(d)(1) was promulgated in the final rule entitled "Medicare and Medicaid Programs; Physicians' Referrals to Health Care Entities With Which They Have Financial Relationships," published in the Federal Register on January 4, 2001 (66 FR 856). A 1-year delay in the effective date of the last sentence in Section 411.354(d)(1) will give Department officials the opportunity to reconsider the definition of compensation that is "set in advance" as it relates to percentage compensation methodologies in order to avoid unnecessarily disrupting existing contractual arrangements for physician services. Accordingly, the last sentence of Section 411.354(d)(1), which would have become effective January 4, 2002, will not become effective until January 6,2003.

  5. 32 CFR 644.136 - Leasing guidelines.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Leasing guidelines. 644.136 Section 644.136 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Acquisition Acquisition by Leasing § 644.136 Leasing guidelines. Division and District...

  6. 23 CFR 710.407 - Leasing.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Leasing. 710.407 Section 710.407 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Real Property Management § 710.407 Leasing. (a) Leasing of real property acquired with title 23 of...

  7. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  8. Formation of the oil and gas lease

    International Nuclear Information System (INIS)

    Gillespie, E.M.; Piercy, J.R.

    1998-01-01

    The legal nature of an oil and gas lease was described and the challenges associated with working with the freehold oil and gas lease were discussed. This paper also reviewed the formalities of execution under seal, issues relating to capacity of the executing party, ability of an executor of an estate to grant the lease, and homestead rights. Precautions that should be taken to ensure that oil and gas lease documents are properly executed so as not to void a lease are also discussed. 46 refs

  9. Lease of agricultural land in public ownership

    Directory of Open Access Journals (Sweden)

    Baturan Luka

    2014-01-01

    Full Text Available This paper analyzes the legal norms which regulate leasing of agricultural land in public ownership. The basic hypothesis is that the main goal of land leasing should be to achieve an efficient allocation and maximization of public rental income. It was concluded that we should eliminate all restrictions that serve as barriers to market allocation. These include provisions that restrict some groups from participating in the land lease auctions, then the preemptive right of lease, as well as the ban on subleasing. It also criticizes the application of the principles of affectation, or restriction of freedom of local governments in the use of funds received from land leasing.

  10. Federal coal lease readjustments: will reason prevail

    Energy Technology Data Exchange (ETDEWEB)

    Margolf, C W

    1988-01-01

    After 1920, when the US Congress passed the Mineral Lands Leasing Act (MLLA), coal owned by the Federal government could only be developed by leasing under the MLLA. Most Federally owned coal is in the west, where the Federal government enjoys a near monopoly in coal ownership and its development. In 1976, congress enacted the Federal Coal Leasing Amendments ACT (FCLAA), over President Ford's veto, in order to: increase rents and royalties on Federal coal leases; force lessees holding Federal coal leases not in production to open mines on the non-producing leases; and end 'speculation' in Federal coal leases. The book maintains that in passing the FCLAA, Congress did not understand the western coal industry, and neither did the Department of the Interior (DOI) in concluding that Congress had mandated that the FCLAA must be applied to pre-FCLAA leases, even those in production, when such leases are readjusted. In the resulting lawsuits, the western coal industry has not been explained to the Federal courts and the decisions regarding the applicability of the FCLAA upon readjustment of pre-FCLAA leases have consequently been wrong. The book examines the record to date and aims to demonstrate the validity of these conclusions. It also describes which actions the DOI should have taken to accomplish the objectives of congress set forth in the FCLAA, to readjust pre-FCLAA leases without litigation.

  11. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  12. ETF interim design review

    International Nuclear Information System (INIS)

    Steiner, D.; Rutherford, P.H.

    1980-01-01

    A three-day ETF Interim Design Review was conducted on July 23-25, 1980, at the Sheraton Potomac Inn in Rockville, Maryland. The intent of the review was to provide a forum for an in-depth assessment and critique of all facets of the ETF design by members of the fusion community. The review began with an opening plenary session at which an overview of the ETF design was presented by D. Steiner, manager of the ETF Design Center, complemented by a physics overview by P.H. Rutherford, chairman of the ETF/INTOR Physics Committee. This was followed by six concurrent review sessions over the next day and a half. The review closed with a plenary session at which the Design Review Board presented its findings. This document consists of the viewgraphs for the opening plenary session and an edited version of the presentations made by Steiner and Rutherford

  13. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  14. 30 CFR 256.50 - Dating of leases.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Dating of leases. 256.50 Section 256.50 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Issuance of Leases § 256.50 Dating of leases. All leases issued under...

  15. 12 CFR 614.4356 - Farm Credit Leasing Services Corporation.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Farm Credit Leasing Services Corporation. 614... OPERATIONS Lending and Leasing Limits § 614.4356 Farm Credit Leasing Services Corporation. The Farm Credit Leasing Services Corporation may enter into a lease agreement with a lessee if the consolidated amount of...

  16. Waste management system functional requirements for Interim Waste Management Facilities (IWMFs) and technology demonstrations, LLWDDD [Low-Level Disposal Development and Demonstration] Program

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of this report is to build upon the preceding decisions and body of information to prepare draft system functional requirements for each classification of waste disposal currently proposed for Low-Level Waste Disposal Development Demonstration (LLWDDD) projects. Functional requirements identify specific information and data needs necessary to satisfy engineering design criteria/objectives for Interim Waste Management Facilities. This draft will suppor the alternatives evaluation process and will continue to evolve as strategy is implemented, regulatory limits are established, technical and economic uncertainties are resolved, and waste management plans are being implemented. This document will become the planning basis for the new generation of solid LLW management facilities on new sites on the Reservation. Eighteen (18) general system requirements are identified which are applicable to all four Low-Level Waste (LLW) disposal classifications. Each classification of LLW disposal is individually addressed with respect ot waste characteristics, site considerations, facility operations, facility closure/post-closure, intruder barriers, institutional control, and performance monitoring requirements. Three initial LLW disposal sites have been proposed as locations on the ORR for the first demonstrations

  17. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  18. 78 FR 33897 - Atlantic Wind Lease Sale 2 (ATLW2) Commercial Leasing for Wind Power on the Outer Continental...

    Science.gov (United States)

    2013-06-05

    ... Management Atlantic Wind Lease Sale 2 (ATLW2) Commercial Leasing for Wind Power on the Outer Continental Shelf Offshore Rhode Island and Massachusetts-- Final Sale Notice and Commercial Wind Lease Issuance and...; MMAA104000] Atlantic Wind Lease Sale 2 (ATLW2) Commercial Leasing for Wind Power on the Outer Continental...

  19. Oyster leases in Louisiana, Geographic NAD83, LOSCO (1997) [oyster_leases_USACE_1997

    Data.gov (United States)

    Louisiana Geographic Information Center — This data set indicates the locations of oyster leases in Louisiana. The lease areas should be polygons, however, the source data has very poor topology including...

  20. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    2006 French Act provides for a research program on interim storage to be carried out along with the repository project development. This program has been guided by the complementarities between interim storage and the repository project. The main research issues address the longevity of storage facilities, up to 100 years, their versatility with regard to waste package types and their modularity to match future needs progressively. In parallel the dialogue between Andra and waste producers will continue to propose optimized waste management scenarios. (author)

  1. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  2. 30 CFR 285.201 - How will MMS issue leases?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How will MMS issue leases? 285.201 Section 285... Energy Leases General Lease Information § 285.201 How will MMS issue leases? The MMS will issue leases on... noncompetitively, as provided under §§ 285.230 and 285.232. We will issue leases on forms approved by MMS and will...

  3. Credit constraints, consumer leasing and the automobile replacement decision

    OpenAIRE

    Kathleen W. Johnson

    1999-01-01

    This paper presents a model of consumer automobile replacement in the presence of leasing. The model incorporates credit constraints to distinguish between the leasing and purchasing options. It demonstrates how leasing increases the probability that a household replaces its automobile and how households that lease choose higher quality automobiles. The qualitative choice model of the household's decision to lease provides support for the observation that households that lease face credit con...

  4. Leveraged Leasing in the Federal Sector.

    Science.gov (United States)

    1983-12-01

    entity obtains cash while the private investors can depreciate the property and obtain investment tax credits and other tax benefits. The costs are borne...lease from a common base point to familiarize the reader with the applicable portions of generally accepted accounting principles, GAAP , and how they...chapter identifies the differences between a basic lease and a leveraged lease in terms of structure and accounting requirements relative to GAAP

  5. Lease Accounting in Australia: Further Empirical Evidence

    OpenAIRE

    Hassan, Salleh; Christopher, Theo

    1998-01-01

    Key words: Australia; Accounting standard; Efficient contracting; Lease accounting; Signalling The objective of this study is to examine the economic factors motivating Australian listed lessee firms to adopt capitalization of finance leases policy from 1985 to 1987 as permitted by the transitional provision of AAS 17. Capitalization is considered as the preferred accounting policy for finance leases compared to footnote disclosure. Adopting a joint efficient contracting and quality signaling pers...

  6. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  7. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  8. Public School Finance Problems in Texas. An Interim Report.

    Science.gov (United States)

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  9. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  10. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  11. Lease Operations Environmental Guidance Document

    Energy Technology Data Exchange (ETDEWEB)

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  12. Interim Evaluation of the Tier 1 Program (Secondary 1 Curriculum of the Project P.A.T.H.S.: First Year of the Full Implementation Phase

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2008-01-01

    Full Text Available To understand the implementation quality of the Tier 1 Program (Secondary 1 Curriculum of the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes in the full implementation phase, 100 schools were randomly selected to participate in personal and/or telephone interviews regarding the quality of the implementation process of the Tier 1 Program. In the interviews, the participants described the responses of the students to the program, the perceived benefits of the program, the perceived good aspects of the program, and the areas requiring improvement, difficulties encountered in the implementation process, and perceived attributes of the worker-support scheme (“Co-Walker Scheme”. Results showed that most workers perceived that the students had positive responses to the program and the program was beneficial to the students. They also identified several good aspects in the program, although negative comments on the program design and difficulties in the implementation process were also recorded. Roughly half of the respondents had positive comments on the “Co-Walker Scheme”. In sum, the respondents generally regarded the program as beneficial to the students and they were satisfied with the Tier 1 Program (Secondary 1 Curriculum in the full implementation phase, although some implementation difficulties were also expressed.

  13. Optimal Lease Contract for Remanufactured Equipment

    Science.gov (United States)

    Iskandar, B. P.; Wangsaputra, R.; Pasaribu, U. S.; Husniah, H.

    2018-03-01

    In the last two decades, the business of lease products (or equipment) has grown significantly, and many companies acquire equipment through leasing. In this paper, we propose a new lease contract under which a product (or equipment) is leased for a period of time with maximum usage per period (e.g. 1 year). This lease contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the customer (as a lessee) will be charged an additional cost. In general, the lessor (OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. It is considered that the lessor offers the lease contract for a remanufactured product. We presume that the price of the lease contract for the remanufactured product is much lower than that of a new one, and hence it would be a more attractive option to the customer. The decision problem for the lessee is to select the best option offered that fits to its requirement, and the decision problem for the lessor is find the optimal maintenance efforts for a given price of the lease option offered. We first find the optimal decisions independently for each party, and then the joint optimal decisions for both parties.

  14. Determinants of leasing business in emerging country

    Directory of Open Access Journals (Sweden)

    Pariang Siagian

    2017-03-01

    Full Text Available The primary purpose of this paper is to examine leasing business in Indonesia, if there is any effect of leasing literacy to the access into leasing company, motivation to buy and ability to pay liabilities. The research’s object is customers of leasing companies who have been buying leasing products and live around Jakarta. While the methodology used will be the qualitative method by using survey and questionnaire. The outcomes revealed that 68.5% of respondents have the average income of less than 5 million per month, and the type of product leased is dominated by motorcycles and cars. Furthermore, the result of regression analysis is the literacy to the access into leasing company has no effect. But on the other hand, the result shows that there is an effect of literacy on motivation and ability to pay liabilities. From this study, it can be concluded that generally, customers do not care about the insight into leasing business. Most of the customers used the literacy for to get the products and to be able to pay the installments obligations. Hence, they need sufficient information about leasing company and its services.

  15. Leasing instruments of high-rise construction financing

    Science.gov (United States)

    Aleksandrova, Olga; Ivleva, Elena; Sukhacheva, Viktoria; Rumyantseva, Anna

    2018-03-01

    The leasing sector of the business economics is expanding. Leasing instruments for high-rise construction financing allow to determine the best business behaviour in the leasing economy sector, not only in the sphere of transactions with equipment and vehicles. Investments in high-rise construction have a multiplicative effect. It initiates an active search and leasing instruments use in the economic behaviour of construction organizations. The study of the high-rise construction sector in the structure of the leasing market participants significantly expands the leasing system framework. The scheme of internal and external leasing process factors influence on the result formation in the leasing sector of economy is offered.

  16. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  17. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  18. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  19. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  20. Computer Program for Calculation of Complex Chemical Equilibrium Compositions, Rocket Performance, Incident and Reflected Shocks, and Chapman-Jouguet Detonations. Interim Revision, March 1976

    Science.gov (United States)

    Gordon, S.; Mcbride, B. J.

    1976-01-01

    A detailed description of the equations and computer program for computations involving chemical equilibria in complex systems is given. A free-energy minimization technique is used. The program permits calculations such as (1) chemical equilibrium for assigned thermodynamic states (T,P), (H,P), (S,P), (T,V), (U,V), or (S,V), (2) theoretical rocket performance for both equilibrium and frozen compositions during expansion, (3) incident and reflected shock properties, and (4) Chapman-Jouguet detonation properties. The program considers condensed species as well as gaseous species.

  1. Critical reflections on the Chemical Leasing concept

    NARCIS (Netherlands)

    Lozano, Rodrigo; Carpenter, Angela; Lozano, Francisco J.

    Chemical Leasing has been developed as a collaborative business model to complement the two main approaches (policy initiatives and scientific/ technological) used to foster green chemistry and sustainable chemistry. Chemical Leasing is based on using chemicals more efficiently, reducing waste, and

  2. Operating-Lease Disclosures: an empirical investigation

    NARCIS (Netherlands)

    M. Lückerath-Rovers (Mijntje)

    2007-01-01

    textabstractIn 2008, the International Accounting Standards Board (IASB), in cooperation with the Financial Accounting Standards Board (FASB), will issue a new proposal to change the current accounting regulation with respect to leasing to an alternative approach. This new lease-accounting approach,

  3. 12 CFR 560.41 - Leasing.

    Science.gov (United States)

    2010-01-01

    ... principal and interest payments that a lessor would receive if the finance lease were structured as a market... property at the expiration of the term of the lease. (c) Finance leasing—(1) Investment limits. A Federal... loans), 5(c)(2)(A) (commercial, business, corporate or agricultural loans), 5(c)(2)(B) (nonresidential...

  4. 29 CFR 779.225 - Leased departments.

    Science.gov (United States)

    2010-07-01

    ..., Franchise and Other Business Arrangements § 779.225 Leased departments. (a) As stated in section 3(r) of the... without) a separate entrance, and operates under a separate name, with his own separate employees and... “leased department” and will not be included in the same enterprise with the lessor. (e) The employees of...

  5. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document with changes)

    Science.gov (United States)

    This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  6. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document)

    Science.gov (United States)

    Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  7. Interim report for documentation of computer programs for crude oil profile analysis. [Codes, CV, CRULE, CPR, CIMPACT, ENT ADJ, REF VOLS, CIMP PRT, C MODEL, C PRINT

    Energy Technology Data Exchange (ETDEWEB)

    This report is summarizing the findings and documenting the programs developed by Economic Regulatory Administration (ERA) for the Crude Oil Profile Analysis. Based on a variety of estimates and assumptions from different sources, ERA developed a series of computer programs which generate a 24-month projection of the crude oil production in each of the price categories. AVANTE International Systems Corporation is contracted to provide an organized documentation for all of these data base, assumptions, estimation rationale and computing procedures.

  8. Application of Securitization of Leasing Assets

    Directory of Open Access Journals (Sweden)

    Igor Viktorovich Linev

    2014-01-01

    Full Text Available Securitization of leasing assets was widely adopted abroad within the last decades. Securitization of leasing assets usually is meant as process of formation of a portfolio based on future leasing payments of one and (or more leasing company and sale of securities to investors for the subsequent refinancing of leasing operations. These securities can be bonds, actions or bills. Thus the asset leased, acts as providing these papers. Nomenclature of property includes office, medical (first of all, stomatology, training, video the equipment, and also a car, motor-equipment, towers of cellular communication production of heavy mechanical engineering and computers. The essence of securitization of leasing assets consists in isolation of streams of leasing payments from risk of bankruptcy of the leasing company. As the considered mechanism has the greatest development in the USA, so far as consideration of experience of its application in this country is represented especially actual. The special attention is deserved by a question of decrease in credit risk of the investor. External and internal providing is applied to its decision in different types. Interest of participants in securitization of leasing assets consists in distribution of risks between them, emergence of a new source of financing, depreciation of attracted resources, increase of liquidity of a leasing portfolio and optimization by management by balance of the enterprise. Appeal of this tool to the leasing company in a case when it has no available own funds for business development, represents separate interest. Securitization allows the leasing company to expand sources of attraction of the capital and to receive a reserve for the future, and also to broaden the sphere of options of activity and to give it new opportunities for financing of projects. Widespread introduction of schemes of securitization in practice of the Russian leasing business, requires development, and on some

  9. Leasing wind turbines (and its alternatives)

    International Nuclear Information System (INIS)

    Johns, Jonathan H.

    1999-01-01

    The financing of wind farms has historically consisted of a mixture of traditional debt and equity, with debt generally being provided by high street or specialist banks, through inter-company loans, or from International Funding Agencies (IFA's) via National Funding Agencies in developing countries. The use of more innovative financing methods has to date been limited. One possible methods of attracting finance for wind farms is the leasing of wind turbines, and this paper sets out the reasons leasing is particularly appropriate for renewable energy (RE) projects (in particular wind farms), the effect leasing may have on returns available to investors, and some of the obstacles that have to be overcome by the RE and wind industry to increase the utilisation of leasing. This paper concludes by discussing the possibility of using a pan-European leasing company as means of providing overseas aid to developing countries, thereby facilitating the implementation of wind energy in these important regions. (Author)

  10. INFLUENCE FACTORS FOR LEASING MARKET CONTRACTS

    Directory of Open Access Journals (Sweden)

    Oana BĂRBULESCU

    2016-11-01

    Full Text Available This paper aims to investigate the relationship between leasing contracts and some factors that influence the value of these contracts. In order to do this, we have decided on some quantitative marketing research by appealing to statistics for accomplishing the objectives that we have set: to find a correlation between the turnover percentage assigned to leasing expenses and several influence factors. This study indicated that the more contracts are signed by a firm, the more likely is to assign a bigger fraction of the income to each new leasing contract. The study confirmed that bigger companies are relying more on leasing as a way of financing than small companies. This study also discovered that companies with more employees are using larger contracts in order to sustain their activity. The findings are expected to contribute to adjusting the offers by the leasing companies, taking into consideration these factors and to using these factors in order to better predict the market evolution.

  11. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  12. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  13. Programming an interim report on the SETL project. Part I: generalities. Part II: the SETL language and examples of its use

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, J T

    1975-06-01

    A summary of work during the past several years on SETL, a new programming language drawing its dictions and basic concepts from the mathematical theory of sets, is presented. The work was started with the idea that a programming language modeled after an appropriate version of the formal language of mathematics might allow a programming style with some of the succinctness of mathematics, and that this might ultimately enable one to express and experiment with more complex algorithms than are now within reach. Part I discusses the general approach followed in the work. Part II focuses directly on the details of the SETL language as it is now defined. It describes the facilities of SETL, includes short libraries of miscellaneous and of code optimization algorithms illustrating the use of SETL, and gives a detailed description of the manner in which the set-theoretic primitives provided by SETL are currently implemented. (RWR)

  14. 18 CFR 367.18 - Criteria for classifying leases.

    Science.gov (United States)

    2010-04-01

    ... the lessee) must not give rise to a new classification of a lease for accounting purposes. ... classifying the lease. (4) The present value at the beginning of the lease term of the minimum lease payments... taxes to be paid by the lessor, including any related profit, equals or exceeds 90 percent of the excess...

  15. 30 CFR 256.80 - Leases of other minerals.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Leases of other minerals. 256.80 Section 256.80 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Section 6 Leases § 256.80 Leases of other minerals. The...

  16. 49 CFR 639.33 - Management of leased assets.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Management of leased assets. 639.33 Section 639.33..., DEPARTMENT OF TRANSPORTATION CAPITAL LEASES Lease Management § 639.33 Management of leased assets. Each recipient must maintain an inventory of capital assets acquired by standard FTA project management...

  17. 47 CFR 76.978 - Leased access annual reporting requirement.

    Science.gov (United States)

    2010-10-01

    ... against the cable system with the Commission or a Federal district court regarding a commercial leased..., which provides the following information for the calendar year: (1) The number of commercial leased... commercial leased access channel. (3) The rates the cable system charges for full-time and part-time leased...

  18. 47 CFR 1.9020 - Spectrum manager leasing arrangements.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Spectrum manager leasing arrangements. 1.9020... Leasing General Policies and Procedures § 1.9020 Spectrum manager leasing arrangements. (a) Overview... may enter into a spectrum manager leasing arrangement, without the need for prior Commission approval...

  19. 77 FR 21803 - Notice of Competitive Coal Lease Sale, Colorado

    Science.gov (United States)

    2012-04-11

    ..., COC-70615] Notice of Competitive Coal Lease Sale, Colorado AGENCY: Bureau of Land Management, Interior... described below in Gunnison County, Colorado, will be offered for competitive lease by sealed bid in accordance with the provisions of the Mineral Leasing Act of 1920, as amended. DATES: The lease sale will be...

  20. Assessment of interim flow water-quality data of the San Joaquin River restoration program and implications for fishes, California, 2009-11

    Science.gov (United States)

    Wulff, Marissa L.; Brown, Larry R.

    2015-01-01

    After more than 50 years of extensive water diversion for urban and agriculture use, a major settlement was reached among the U.S. Departments of the Interior and Commerce, the Natural Resources Defense Council, and the Friant Water Users Authority in an effort to restore the San Joaquin River. The settlement received Federal court approval in October 2006 and established the San Joaquin River Restoration Program, a multi-agency collaboration between State and Federal agencies to restore and maintain fish populations, including Chinook salmon, in the main stem of the river between Friant Dam and the confluence with the Merced River. This is to be done while avoiding or minimizing adverse water supply effects to all of the Friant Division contractors that could result from restoration flows required by the settlement. The settlement stipulates that water- and sediment-quality data be collected to help assess the restoration goals. This report summarizes and evaluates water-quality data collected in the main stem of the San Joaquin River between Friant Dam and the Merced River by the U.S. Bureau of Reclamation for the San Joaquin River Restoration Program during 2009-11. This summary and assessment consider sampling frequency for adequate characterization of variability, sampling locations for sufficient characterization of the San Joaquin River Restoration Program restoration reach, sampling methods for appropriate media (water and sediment), and constituent reporting limits. After reviewing the water- and sediment-quality results for the San Joaquin River Restoration Program, several suggestions were made to the Fisheries Management Work Group, a division of the San Joaquin River Restoration Program that focuses solely on the reintroduction strategies and health of salmon and other native fishes in the river. Water-quality results for lead and total organic carbon exceeded the Surface Water Ambient Monitoring Program Basin Plan Objectives for the San Joaquin Basin

  1. 77 FR 71612 - Atlantic Wind Lease Sale 2 (ATLW2) Commercial Leasing for Wind Power on the Outer Continental...

    Science.gov (United States)

    2012-12-03

    ... Wind Lease Sale 2 (ATLW2) Commercial Leasing for Wind Power on the Outer Continental Shelf Offshore...), Interior. ACTION: Proposed Sale Notice for commercial leasing for wind power on the Outer Continental Shelf... sale of commercial wind energy leases on the Outer Continental Shelf (OCS) offshore Rhode Island and...

  2. Federal Employees Health Benefits and Federal Employees Dental and Vision Insurance Programs' Coverage Exception for Children of Same-Sex Domestic Partners. Interim final rule.

    Science.gov (United States)

    2016-12-02

    This action amends the rule to create a regulatory exception that allows children of same-sex domestic partners living overseas to maintain their Federal Employees Health Benefits (FEHB) and Federal Employees Dental and Vision Program (FEDVIP) coverage until September 30, 2018. Due to a recent Supreme Court decision, as of January 1, 2016, coverage of children of same-sex domestic partners under the FEHB Program and FEDVIP will generally only be allowed if the couple is married, as discussed in Benefits Administration Letter (BAL) 15-207 dated October 5, 2015. OPM recognizes there are additional requirements placed on overseas federal employees that may not apply to other civilian employees with duty stations in the United States making it difficult to travel to the United States to marry same-sex partners.

  3. 25 CFR 162.605 - Negotiation of leases.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Negotiation of leases. 162.605 Section 162.605 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER LEASES AND PERMITS Non-Agricultural Leases § 162.605 Negotiation of leases. (a) Leases of individually owned land or tribal land may be negotiated by those owners or their...

  4. Geopressure industrial forums, newsletter and lease support. Final report, April 7, 1981-December 31, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Knutson, C.F.

    1983-12-01

    In the course of this contract C. K. GeoEnergy: (1) planned, organized, conducted, and reported on six DOE/Industry Forum meetings where the progress of DOE's resource development program was outlined and discussed (these six forum meetings included three meetings of the Drilling and Testing Subgroup and three meetings of the Overview Group), (2) prepared and distributed 15 newsletters, and (3) prepared three reports for DOE lease support. This final report includes summaries of each of the forum meetings as well as the three lease support meetings and the newsletter program.

  5. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  6. PROBLEMS AND PROSPECTS FOR THE DEVELOPMENT OF THE FIRST MARKET OF LEASE LAND IN UKRAINE

    Directory of Open Access Journals (Sweden)

    Hunko L.A.

    2017-08-01

    Full Text Available The land is the main asset of the farmer. The basic production of agricultural products, the food security of the state and its export potential today depend directly on the ability of agricultural producers to conduct sustainable production. However, in addition to the natural elements that stand in the way of stabilizing the situation in the field of agriculture, we also have a chronic presence of numerous "man-made" problems that remain unsettled for years. One of the most significant and painful of them is the state registration of the right to lease land. Long-term disorder, corporate wars between state authorities for the right to land relations, negligent attitude to information on land rights and their encumbrances, the shifting of competence among registrars of land tenure rights continue to cause complaints from agricultural producers. But the peculiarities of the legal regulation of the state registration of the right to lease land for agricultural purposes did not become the subject of a separate scientific study. Consequently, the purpose of this work is to study and analyze the problems of legal regulation of state registration of the right to lease land and to find an acceptable option for their further solution. Since the reform of the agrarian sector of Ukraine, the most common form of land use in agricultural production is the use of land by agricultural producers on a lease. The advantage of leasing relations in agricultural production is enshrined in the Concept of the State Target Program for Land Relations Development in Ukraine for the period up to 2020, which was approved by the Resolution of the Cabinet of Ministers of Ukraine dated June 17, 2009 No. 743-p. The right to lease a land plot is mediated by a contract concluded in accordance with the Article 20 of the Law of Ukraine "On land lease" is subject to mandatory state registration,on the other hand in Article 125 of the Land Code of Ukraine, it is stated that the

  7. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  8. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  9. Agenda 21 interim balance, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  10. U.S. DOE FreedomCAR and Vehicle Technologies Advanced Technology Development Program for Lithium-Ion Batteries: Gen 2 Performance Evaluation Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Jon P. Christophersen; Chet Motloch; Ira D. Bloom; Vince Battaglia; Ganesan Nagasubramanian; Tien Q. Duong

    2003-02-01

    The Advanced Technology Development Program is currently evaluating the performance of the second generation of Lithium-ion cells (i.e., Gen 2 cells). The 18650-size Gen 2 cells consist of a baseline chemistry and one variant chemistry. These cells were distributed over a matrix consisting of three states-of-charge (SOC) (60, 80, and 100% SOC), four temperatures (25, 35, 45, and 55°C), and three life tests (calendar-, cycle-, and accelerated-life). The calendar-life cells are clamped at an opencircuit voltage corresponding to 60% SOC and undergo a once-per-day pulse profile. The cycle-life cells are continuously pulsed using a profile that is centered around 60% SOC. The accelerated-life cells are following the calendar-life test procedures, but using the cycle-life pulse profile. Life testing is interrupted every four weeks for reference performance tests (RPTs), which are used to quantify changes in capacity, resistance, and power. The RPTs consist of a C1/1 and C1/25 static capacity tests, a low-current hybrid pulse power characterization test, and electrochemical impedance spectroscopy at 60% SOC. Capacity-, power-, and electrochemical impedance spectroscopy-based performance results are reported.

  11. Maywood Interim Storage Site, Maywood, New Jersey: Annual site environmental report, Calendar year 1987: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-04-01

    The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and throium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in this report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (because of the greater amounts of cosmic radiation present at higher altitudes). The cumulative dose to the population within an 80-km (50 mile) radium of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1987 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 17 refs., 8 figs., 15 tabs.

  12. Financial distress prediction and operating leases

    NARCIS (Netherlands)

    Lückerath – Rovers, M.

    2009-01-01

    This study investigates whether including operating lease commitments in financial distress prediction models would increase the classification accuracy of these models. Classification accuracy measures the percentages of correctly classified companies in either of the two categories (healthy or

  13. Lease vs. Purchase in Defense Acquisition

    National Research Council Canada - National Science Library

    Hensley, Carlton L; Tinjum, Archie L

    2008-01-01

    With declining budgets and consolidation in the defense industry, should competition between prime and sub-prime contractors be fostered through innovative lease arrangements similar to the Navy's TAKX...

  14. Emerging accounting trends accounting for leases.

    Science.gov (United States)

    Valletta, Robert; Huggins, Brian

    2010-12-01

    A new model for lease accounting can have a significant impact on hospitals and healthcare organizations. The new approach proposes a "right-of-use" model that involves complex estimates and significant administrative burden. Hospitals and health systems that draw heavily on lease arrangements should start preparing for the new approach now even though guidance and a final rule are not expected until mid-2011. This article highlights a number of considerations from the lessee point of view.

  15. LEASE FINANCING: A NEW DUAL APPROACH

    Directory of Open Access Journals (Sweden)

    Cristina-Aurora, BUNEA-BONTAS

    2013-12-01

    Full Text Available Leasing is an important additional financing technique used by many companies, enabling them to use property, plant and equipment without making large initial cash outlays. It also provides flexibility, allowing entities to address obsolescence risks. Under current accounting rules, when referring to the operating leasing in particular, there is a lack of comparability between the financial position and operating results of companies that buy assets and the financial position and operating results of those that lease similar assets. This has led critics to assert that the current accounting does not portray the economics of lease arrangements. In response to this criticism, the IASB and FASB have developed a new approach to lease accounting that would require a lessee to recognise assets and liabilities for the rights and obligations created by leases, this providing greater transparency and comparability for financial statements users. On the other hand, the proposals will affect almost every company and the impact of the proposed changes may be significant, as recognising additional assets and liabilities and finance expense will affect key performance ratios and, consequently, the ability to satisfy debt covenants.

  16. A framework for determining optimal petroleum leasing

    International Nuclear Information System (INIS)

    Robinson, D.R.

    1991-01-01

    The techniques of auction theory and option theory are combined to allow valuation under both geologic and oil price uncertainty. The primary motivation for developing this framework is to understand the prevalence of leasing in transferring ownership of oil properties. Under a standard oil lease, the landowner sells an oil company the right to explore and develop a tract of land for a fixed period of time. If oil is found, a fraction of the revenues is reserved for the landowner. Compared to the outright sale of the minerals, leasing has the disadvantages of: (1) lowering total oil field value through alteration of investment incentives; (2) providing the seller with a more risk cash flow; and (3) increasing legal and administrative costs. It is demonstrated here that in lease sales as compared to full mineral interest sales, the relative disadvantages are offset by more effective value transfer to the seller. For the base-case parameters, the optimal lease in a bonus auction gives the seller 28% more value than the sale of the full mineral interest. There is a loss in the leasing process from distortion of development timing incentives

  17. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  18. Terrestrial gravity data analysis for interim gravity model improvement

    Science.gov (United States)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  19. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  20. The ABCs of Technology Leasing: Get the Facts on the Pros and Cons of Leasing

    Science.gov (United States)

    Aldridge, Robb

    2005-01-01

    Ownership means control. What one buys is easier to manage with respect to upgrading or getting rid of equipment that is no longer adequate for the job. Purchasing can put severe demands on cash flow, however, so sometimes the budget drives the decision to lease. Not surprisingly, leasing reverses the advantages and disadvantages of ownership. For…

  1. 30 CFR 250.182 - When may the Secretary cancel a lease at the exploration stage?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When may the Secretary cancel a lease at the... Requirements, Lease Term Extensions, and Lease Cancellations § 250.182 When may the Secretary cancel a lease at... be modified to avoid the condition(s). The Secretary may cancel the lease if: (a) The primary lease...

  2. 25 CFR 162.229 - How long can the term of an agricultural lease run?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How long can the term of an agricultural lease run? 162... AND PERMITS Agricultural Leases Lease Requirements § 162.229 How long can the term of an agricultural lease run? (a) An agricultural lease must provide for a definite lease term, specifying the commencement...

  3. 26 CFR 1.514(f)-1 - Definition of business lease.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 7 2010-04-01 2010-04-01 true Definition of business lease. 1.514(f)-1 Section... § 1.514(f)-1 Definition of business lease. (a) In general. The term business lease means any lease... extension, the lease shall be considered a 3-year lease and hence does not meet the definition of a business...

  4. 26 CFR 1.280F-5T - Leased property (temporary).

    Science.gov (United States)

    2010-04-01

    ... incidental leasing activity is insufficient. For example, a person leasing only one passenger automobile during a taxable year is not regularly engaged in the business of leasing automobiles. In addition, an... listed property leased or held for leasing by any person regularly engaged in the business of leasing...

  5. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  6. 48 CFR 23.704 - Application to Government-owned or -leased facilities.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Application to Government... and Services 23.704 Application to Government-owned or -leased facilities. Executive Order 13101...

  7. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  8. 78 FR 21912 - Proposed Information Collection; Comment Request; Crab Rationalization (CR) Program: Annual Report

    Science.gov (United States)

    2013-04-12

    ... consolidation, absentee quota share (QS) ownership, and changes in crew compensation as some of the program's... financial impacts of high lease rates, the amount of any lease payments charged to crews could be limited or...

  9. DEVELOPMENT FEATURES OF LEASING RELATIONS IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Patimat A. Abdulkhalikova

    2017-01-01

    Full Text Available Abstract. Objectives Leasing, which is an alternative to traditional forms of investment for Russia, is currently among the most effective methods of financing construction organisations. Under conditions of shortage of available financial resources, leasing allows the modernisation of production to be carried out, modern equipment to be used or new production facilities to be opened in the shortest possible time. The purpose of the study is to comprehensively substantiate the specifics of leasing operations in construction and demonstrate its advantages as a tool for financing construction organisations. Methods The theoretical basis of the study was the fundamental provisions of economic, financial and management theory. During the process of research, logical, statistical and comparative analysis methods were used alongside expert evaluation and factor analysis approaches. Results For a leasing company whose purpose is to identify potential risk areas associated with the possibility of exceeding planned costs, it is recommended that a feasibility analysis be carried out prior to forming a loan portfolio. It is established that the transactions of a leasing company with a construction organisation can be presented as a separate investment project with a complex financial structure and a combination of interrelated long-term contracts. It is shown that the standardisation of principles of corporate governance and risk management is capable not only of reducing the susceptibility of a construction organisation to risk, but also of increasing the degree of trust on the part of customers and counterparties. Conclusion The expediency of using leasing in construction is due to the insufficient volume of private funds for the acquisition of equipment, which becomes particularly relevant against the background of rapidly aging facilities of construction organisations. Under conditions of largescale technical re-equipment, in which advanced

  10. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  11. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  12. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  13. 25 CFR 211.51 - Surrender of leases.

    Science.gov (United States)

    2010-04-01

    ... received by the superintendent or area director; (g) If oil, gas, or geothermal resources are being drained from the leased premises by a well or wells located on lands not included in the lease, the Secretary...

  14. Cost/Benefit Analysis of Leasing Versus Purchasing Computers

    National Research Council Canada - National Science Library

    Arceneaux, Alan

    1997-01-01

    .... In constructing this model, several factors were considered, including: The purchase cost of computer equipment, annual lease payments, depreciation costs, the opportunity cost of purchasing, tax revenue implications and various leasing terms...

  15. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  16. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  17. FINANCIAL REPORTING AND TAX IMPLICATIONS OF REAL ESTATE LEASE

    OpenAIRE

    Snežana Miletić; Savka Vučković Milutinović

    2013-01-01

    Leasing is a very popular way of acquiring fixed assets, but despite its importance and presence the users of financial statements are often not in a position to realistically consider reporting entity's lease transactions and their impact on entity's financial position and performance. For years, current financial reporting for leases has been subject to many critiques. The reason for this primary lies in the fact that it left a lot of opportunities for manipulation during the lease classifi...

  18. 25 CFR 215.7 - Advertisement of sale of leases.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Advertisement of sale of leases. 215.7 Section 215.7 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEAD AND ZINC MINING OPERATIONS AND LEASES, QUAPAW AGENCY § 215.7 Advertisement of sale of leases. Upon authority being granted by...

  19. 24 CFR 982.603 - SRO: Lease and HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false SRO: Lease and HAP contract. 982... Types Single Room Occupancy (sro) § 982.603 SRO: Lease and HAP contract. For SRO housing, there is a separate lease and HAP contract for each assisted person. ...

  20. 18 CFR 367.19 - Accounting for leases.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Accounting for leases. 367.19 Section 367.19 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Instructions § 367.19 Accounting for leases. (a) All leases must be classified as either capital or operating...

  1. 7 CFR 765.252 - Lease of security.

    Science.gov (United States)

    2010-01-01

    ... as security for FLP loans. (1) For loans secured by real estate before December 23, 1985, the Agency has a security interest in any mineral rights the borrower has on the real estate pledged as... Lease of security. (a) Real estate leases. The borrower may lease real estate security provided the...

  2. 77 FR 40630 - Notice of Competitive Coal Lease Sale, Colorado

    Science.gov (United States)

    2012-07-10

    ..., COC-74219] Notice of Competitive Coal Lease Sale, Colorado AGENCY: Bureau of Land Management, Interior... in the Wadge Seam described below in Routt County, Colorado, will be offered for competitive lease by sealed bid in accordance with the provisions of the Mineral Leasing Act of 1920, as amended. DATES: The...

  3. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  4. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  5. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  6. An Auction-Based Spectrum Leasing Mechanism for Mobile Macro-Femtocell Networks of IoT

    Directory of Open Access Journals (Sweden)

    Xin Chen

    2017-02-01

    Full Text Available The Internet of Things (IoT is a vision of the upcoming society. It can provide pervasive communication between two or more entities using 4G-LTE (Long Term Evolution communication technology. In 4G-LTE networks, there are two important problems: helping manage the spectrum demands of IoT devices and achieving much more revenue with the limited resource. This paper proposes a pricing framework to investigate the spectrum leasing in mobile heterogeneous networks with single macrocell and multiple femtocells. We modeled the leasing procedure between the macrocell service provider (MSP and femtocell holders (FHs as an auction to motivate the MSP to lease its spectrum resource. All FHs act as the bidders, and the monopolist MSP acts as the auctioneer. In the auction, FHs submit their bids to rent the spectrum resource so that they can make a profit by selling it to their subscribers. The MSP determines the spectrum leasing amount and chooses the winning FHs by solving the dynamic programming-based 0–1 knapsack problem. In our proposed framework, we focus on the spectrum pricing strategy and revenue maximization of the MSP. The simulation results show that the proposed scheme provides effective motivation for the MSP to lease the spectrum to FHs, and both the MSP and FHs can benefit from spectrum leasing.

  7. An Auction-Based Spectrum Leasing Mechanism for Mobile Macro-Femtocell Networks of IoT.

    Science.gov (United States)

    Chen, Xin; Xing, Lei; Qiu, Tie; Li, Zhuo

    2017-02-16

    The Internet of Things (IoT) is a vision of the upcoming society. It can provide pervasive communication between two or more entities using 4G-LTE (Long Term Evolution) communication technology. In 4G-LTE networks, there are two important problems: helping manage the spectrum demands of IoT devices and achieving much more revenue with the limited resource. This paper proposes a pricing framework to investigate the spectrum leasing in mobile heterogeneous networks with single macrocell and multiple femtocells. We modeled the leasing procedure between the macrocell service provider (MSP) and femtocell holders (FHs) as an auction to motivate the MSP to lease its spectrum resource. All FHs act as the bidders, and the monopolist MSP acts as the auctioneer. In the auction, FHs submit their bids to rent the spectrum resource so that they can make a profit by selling it to their subscribers. The MSP determines the spectrum leasing amount and chooses the winning FHs by solving the dynamic programming-based 0-1 knapsack problem. In our proposed framework, we focus on the spectrum pricing strategy and revenue maximization of the MSP. The simulation results show that the proposed scheme provides effective motivation for the MSP to lease the spectrum to FHs, and both the MSP and FHs can benefit from spectrum leasing.

  8. Innovative leasing engineering as tool for synchronization of innovative, leasing and buying cycles

    Science.gov (United States)

    Yaskova, Natalia; Alekseeva, Tatyana

    2017-10-01

    This article suggests a new principle of cyclic synchronization of innovative, leasing and buying cycles in construction “innovative leasing engineering” which facilitates the accelerated transition of the national economy to the innovative way of development. Cyclical nature of economic phenomena is not only their immanent property, but also the subject of economic analysis. Modern format of decision making management requires analysis of the many cycles which fill any kind of activity. Accounting and reconciliation of construction, design, investment, buying, reproduction, leasing and other cycles is important for investment and construction sphere from the point of view of necessity for synchronization and position of determining the nature of trends in sectoral development.

  9. 78 FR 76643 - Atlantic Wind Lease Sale 3 (ATLW3) Commercial Leasing for Wind Power on the Outer Continental...

    Science.gov (United States)

    2013-12-18

    ...; MMAA104000] Atlantic Wind Lease Sale 3 (ATLW3) Commercial Leasing for Wind Power on the Outer Continental.... ACTION: Proposed Sale Notice for Commercial Leasing for Wind Power on the Outer Continental Shelf Offshore Maryland. SUMMARY: This document is the Proposed Sale Notice (PSN) for the sale of commercial wind...

  10. Leasing: una alternativa de financiamiento para PYMES

    OpenAIRE

    Bedjan, María Belén

    2008-01-01

    En la actualidad las pequeñas y medianas empresas encuentran dificultades para acceder a las líneas tradicionales de créditos bancarios. Por otro lado las empresas necesitan actualizarse constantemente para poder ser competitivas en el mercado. Es aquí donde el leasing nace como una alternativa de financiación para las PyMEs. Este trabajo pretendió demostrar la conveniencia financiera del leasing con respecto a los préstamos bancarios para la compra de maquinarias agrícolas ...

  11. LEASE AS INSTITUTE OF OBLIGATORY AND REAL RIGHTS

    Directory of Open Access Journals (Sweden)

    Damir Kontrec

    2016-01-01

    Full Text Available The lease contract often occurs in practice and is one of the contract on the temporary transfer and use of things and goods. General regulation of the lease agreement stipulates by Obligations Act, on the other hand there are a number of special regulations governing contracts for the lease of specific types of things (agricultural land, office, ship. The article specifically points to the case law dealing with the institution of lease, especially talking about the lease as an institute real (land rights.

  12. RESIDUAL VALUE RISK IN AUTOMOTIVE OPERATING LEASE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Ivan Tot

    2017-01-01

    Full Text Available The subject of the research in this paper are automotive operating lease contracts in the Croatian business practice. The provisions of the general terms and conditions for operating lease contracts of the Croatian leasing companies are being analysed, particulary those relating to the rights and obligations of the parties to the contract after the operating lease contract was terminated and the motor vehicle returned to the lessor. The existence of three contractual models of the automotive operating lease contract in the Croatian business practice is established, which vary with regard to the assignment and the distribution of the residual value risk. Those contractual models are being compared with the two most common contractual models of automotive lease contracts in the Austrian and German business practice: the lease contract with the excess mileage adjustment and the lease contract with the terminal rent adjustment. On the basis of the results of this comparison, applicability of the legal solutions, developed in the Austrian and German jurisprudence and legal literature regarding the lease contract with the excess mileage adjustment and the lease contract with the terminal rent adjustment, to the automotive operating lease contract within the framework of Croatian law, is being examinded.

  13. International experience in the use of leasing relations in Ukraine

    Directory of Open Access Journals (Sweden)

    L.V. Mikhalchuk

    2015-09-01

    Full Text Available The article examines the market of leasing relations in the UK, Germany, France, the USA. Comparative analysis of development of leasing in foreign countries has been carried out in order to use international experience of leasing relations in Ukraine at the present stage of development of state economy. In spite of prevalence of leasing in developed countries, this kind of relationship is still uncommon in the economic environment of Ukraine because of its novelty and lack of experience. Relevance of leasing development in Ukraine, including the formation of leasing market, primarily is caused by a significant proportion of obsolete equipment and low efficiency of its use. One of solutions to these problems can be leasing which brings together all the elements of international trade, credit, and investment operations.

  14. Advantage from Funding Durable Centers Leasing

    Directory of Open Access Journals (Sweden)

    Alina Zając

    2009-09-01

    Full Text Available In present market conditions huge number of businessmen has problems from gain over from banks capital on purchase of durable centers not only, but also on develop - ment and operating activity Individual can use with different forms funding investment, it which is between different leasing.

  15. Financier-led asset lease model

    NARCIS (Netherlands)

    Zhao, X.; Angelov, S.A.; Grefen, P.W.P.J.; Meersman, R.A.; Dillon, T.S.

    2010-01-01

    Nowadays, the business globalisation trend drives organisations to spread their business worldwide, which in turn generates vast asset demands. In this context, broader asset channels and higher financial capacities are required to boost the asset lease sector to meet the increasing asset demands

  16. Why your lease is an important asset.

    Science.gov (United States)

    Wood, Jason P; Wood, Patrick J

    2008-07-01

    The authors represent more than 3,500 dentists in California and have utilized their experience, knowledge and actual client examples to provide a thorough guide to protecting your future income and sale of your dental practice. This article is intended to provide an in-depth prospective of the value of the lease for your dental practice.

  17. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  18. The EMEFS model evaluation. An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  19. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Science.gov (United States)

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  20. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  1. Next Generation Melter Optioneering Study - Interim Report

    International Nuclear Information System (INIS)

    Gray, M.F.; Calmus, R.B.; Ramsey, G.; Lomax, J.; Allen, H.

    2010-01-01

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D 2 0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  2. Methods Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  3. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  4. 1987 Federal interim storage fee study: A technical and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  5. 1987 Federal interim storage fee study: A technical and economic analysis

    International Nuclear Information System (INIS)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  6. Marketing Factors Affecting Leasing Selection in Bosnia and Herzegovina: Case Study on VB Leasing

    Directory of Open Access Journals (Sweden)

    Almir Ljeskovica

    2014-06-01

    Full Text Available In constantly changing environment all types of companies need some support from various types of funding institutions. Companies use their own resources to finance some projects or purchases but also take loans, mostly from banks to have additional support or in case of lack of money. Beside small, medium, as well as big companies, physical persons also use different types of financing to achieve their goals and fulfil their needs. Financing companies need to recognize the criteria on which prospective customers establish their financing selection decision. Planning a proper marketing strategy in order to attract new customers is of crucial importance in identifying these criteria. The main purpose of the study is to identify which factors affects people to choose leasing services. For data collection and analyse both, qualitative and quantitative study is conducted. Data for this study were collected through surveys delivered to 65 VB Leasing users from Sarajevo region. Out of 65, 57 useful responses were accepted for further analysis. Also interview was done with director of VB Leasing for qualitative study in order to get more insights in this topic. Findings of the study show what are the important factors for leasing selection and these information can support leasing managers in designing marketing strategies for perspective customers.

  7. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  8. 24 CFR 982.516 - Family income and composition: Regular and interim examinations.

    Science.gov (United States)

    2010-04-01

    ... VOUCHER PROGRAM Rent and Housing Assistance Payment § 982.516 Family income and composition: Regular and... assistance payment. (For a voucher tenancy, the housing assistance payment shall be calculated in accordance... the housing assistance payment resulting from an interim redetermination. (2) At the effective date of...

  9. 76 FR 52996 - Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim...

    Science.gov (United States)

    2011-08-24

    ... Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim Program of Inspection Related to Audits of Brokers and Dealers August 18, 2011. I. Introduction On June 21, 2011, the Public... that would be imposed on different categories of registered public accounting firms and classes of...

  10. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    Science.gov (United States)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  11. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  12. Decision Tree Approach to Discovering Fraud in Leasing Agreements

    OpenAIRE

    Horvat Ivan; Pejić Bach Mirjana; Merkač Skok Marjana

    2014-01-01

    Background: Fraud attempts create large losses for financing subjects in modern economies. At the same time, leasing agreements have become more and more popular as a means of financing objects such as machinery and vehicles, but are more vulnerable to fraud attempts. Objectives: The goal of the paper is to estimate the usability of the data mining approach in discovering fraud in leasing agreements. Methods/Approach: Real-world data from one Croatian leasing firm was used for creating tow mo...

  13. An analysis of the buy-vs-lease decision.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2006-02-01

    This article presents a financial model to analyze the buy-vs-lease decision. The model is constructed from the perspective of a lessee with an operating lease and uses the concept of net present value, which calculates the current value of predicted cash flows in the future. Predicted cash flows of an operating lease compared with buying are presented in the model, as is the after-tax borrowing rate, the appropriate discount rate used in a model of this type. The article also discusses nonfinancial factors that may influence the buy-vs-lease decision, including the need for flexibility in working capital and the anticipated technological obsolescence of equipment.

  14. EVALUAREA CONTRACTELOR DE LEASING LA NIVELUL ÎNTREPRINDERII

    Directory of Open Access Journals (Sweden)

    Mihaela Diaconu

    2011-01-01

    Full Text Available This paper outlines a framework for lease vs buy analysis. It also hightlines various aspectsof the lease/buy decision. The decision to lease or buy needs a comparison of alternativefinancing arrangements for the use of an asset. We provide a format for comparing netpresent value of the options, taking into account the analzsis of lease and buy using loans.Net present value is a more simple criterion to use in practice than dicounting costs, directlyreflecting the increasing value of the company as a result of its decision.

  15. 78 FR 59968 - Potential Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore Oregon...

    Science.gov (United States)

    2013-09-30

    ... technical and financial qualifications can be found at: http://www.boem.gov/Renewable-Energy-Program... submissions of indications of interest in obtaining a commercial lease for wind energy development on the OCS... area described in this notice, the potential environmental consequences of wind energy development in...

  16. 78 FR 760 - Potential Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore New...

    Science.gov (United States)

    2013-01-04

    ... technical and financial qualifications can be found at: http://www.boem.gov/Renewable-Energy-Program... lease for wind energy development on the OCS offshore New York for the area identified in this notice... project to supply the Long Island and New York City region with renewable energy, consistent with New York...

  17. EMCS Retrofit Analysis - Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  18. Theory of Financial Lease Contracts - Why all capital goods are not leased

    OpenAIRE

    Penttinen, Jussi

    2013-01-01

    The economic theory states that the capital structure of a firm is irrelevant in a perfect frictionless world. Hence when the assumptions of the Modigliani–Miller theorem and the CAPM hold, the question about the optimal source of funding of capital investments is also irrelevant. In practice though, capital leasing is widely used and the decision to lease or own assets is hardly a matter of indifference to firms or individuals. The motivation of this thesis is to identify when and why leasin...

  19. A New Lease on Learning.

    Science.gov (United States)

    Anderson, Lorin W.; Pellicer, Leonard O.

    1993-01-01

    South Carolina has found that meaningful improvement in Chapter 1 schools requires taking six crucial steps: (1) set meaningful goals; (2) pay attention to school culture; (3) revamp the curriculum; (4) pick up the pace; (5) integrate learning objectives with the regular program; and (6) change teaching tactics. An insert summarizes changes…

  20. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  1. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  2. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  3. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  4. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  5. Financial Leasing: Problems and Prospects of Development in Ukraine

    Directory of Open Access Journals (Sweden)

    Ganna Gridina

    2017-09-01

    Full Text Available The article highlights the current state of the financial services market, in particular financial leasing, which is a form of intensification of the investment process in Ukraine. The main problems of financial leasing development and prospects of its development in Ukraine are revealed. The shortcomings and advantages of financial leasing and its characteristics are determined. The article assesses the state of the Ukrainian market of leasing services and identifies the main problems of its functioning. An estimation of the development of the number of leasing companies in Ukraine is made. It is established that the number of legal entities - lessors remains almost unchanged, but financial companies that provide financial leasing services are rapidly developing. It is substantiated that financial companies providing financial leasing services as universal institutions provide a wider range of financial services in crisis conditions; it serves as the basis for the growth of their number. In these circumstances, these financial institutions can take over the functions of banks and develop at the expense of a larger portfolio of financial services than in highly specialized institutions. Distribution of concluded financial leasing agreements is characterized by the fact that transport, agriculture and construction were the most significant decrease. The services sector, machine building and metallurgy were almost not influenced of the destructive processes. Extractive industry, in contrast to the rest of the industries, has increased the volumes of financial leasing contracts. In the course of the study, the hypothesis of the substitutability of bank lending by leasing was confirmed, which is confirmed by the growing number of financial companies providing financial leasing services while simultaneously reducing the number of banks.

  6. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  7. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  8. Hanford Federal Facility state of Washington leased land

    International Nuclear Information System (INIS)

    1993-11-01

    This report was prepared to provide information concerning past solid and hazardous waste management practices for all leased land at the US DOE Hanford Reservation. This report contains sections including land description; land usage; ground water, air and soil monitoring data; and land uses after 1963. Numerous appendices are included which provide documentation of lease agreements and amendments, environmental assessments, and site surveys

  9. 12 CFR 714.4 - What are the lease requirements?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false What are the lease requirements? 714.4 Section 714.4 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS... reasonably expect to recoup your entire investment in the leased property, plus the estimated cost of...

  10. Hanford Federal Facility state of Washington leased land

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This report was prepared to provide information concerning past solid and hazardous waste management practices for all leased land at the US DOE Hanford Reservation. This report contains sections including land description; land usage; ground water, air and soil monitoring data; and land uses after 1963. Numerous appendices are included which provide documentation of lease agreements and amendments, environmental assessments, and site surveys.

  11. FINANCIAL ASPECTS OF ECOLOGICAL CLEAN LEASE IN CARPATHIAN MACROREGION

    Directory of Open Access Journals (Sweden)

    Taras Sus

    2016-06-01

    Full Text Available The features of the modern development of the agricultural land lease market in Ukraine are considered. The possible two scenarios of development of land relations in the context of the moratorium on land sales and financial crisis are proposed. The basic directions of development of land relations and the threat of sale of agricultural land bypass the moratorium by perpetual lease transaction are considered. Because of the difficult economic conditions in Ukraine, devaluation of the national currency and decreasing of real rent, increasing poverty among the rural population perpetual lease agreements will gain more and more popularity. This creates dangerous tendencies for legal land quasi market organization in terms of the moratorium and in modern realities it is gaining popularity among large agricultural holdings. The increasing popularity of perpetual lease promotes the factor that land owners are able to obtain a large sum of money immediately after contract conclusion, but not in parts during the lease term. Inducing factors of such a scenario of land relations development and the gaps in legal support of agricultural reform are considered. Financial problems of ecological clean land lease and the ways of their solution are outlined. Key words: ecological agricultural production, lease, perpetual lease, rent, land  relations. JEL: Q 14, R 58

  12. Chemical Leasing business models and corporate social responsibility.

    Science.gov (United States)

    Moser, Frank; Jakl, Thomas; Joas, Reihard; Dondi, Francesco

    2014-11-01

    Chemical Leasing is a service-oriented business model that shifts the focus from increasing sales volume of chemicals towards a value-added approach. Recent pilot projects have shown the economic benefits of introducing Chemical Leasing business models in a broad range of sectors. A decade after its introduction, the promotion of Chemical Leasing is still predominantly done by the public sector and international organizations. We show in this paper that awareness-raising activities to disseminate information on this innovative business model mainly focus on the economic benefits. We argue that selling Chemical Leasing business models solely on the grounds of economic and ecological considerations falls short of branding it as a corporate social responsibility initiative, which, for this paper, is defined as a stakeholder-oriented concept that extends beyond the organization's boundaries and is driven by an ethical understanding of the organization's responsibility for the impact of its business activities. For the analysis of Chemical Leasing business models, we introduce two case studies from the water purification and metal degreasing fields, focusing on employees and local communities as two specific stakeholder groups of the company introducing Chemical Leasing. The paper seeks to demonstrate that Chemical Leasing business models can be branded as a corporate social responsibility initiative by outlining the vast potential of Chemical Leasing to improve occupational health and safety and to strengthen the ability of companies to protect the environment from the adverse effects of the chemicals they apply.

  13. Aspects of royalty clauses inside freehold oil and gas leases

    International Nuclear Information System (INIS)

    Hughes, N.T.

    1998-01-01

    Some of the most common royalty clauses currently used are discussed with particular emphasis on the CAPL 88 and the CAPL 91 petroleum and natural gas lease forms and the provisions regarding lessors and lessees. The problems regarding their practical applications are described. The legal status of a royalty inside a freehold oil and gas lease is also examined. 4 refs

  14. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  15. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  16. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  17. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  18. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  19. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  20. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  1. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  2. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  3. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  4. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  5. Climate change : we are at risk : interim report

    International Nuclear Information System (INIS)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  6. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    International Nuclear Information System (INIS)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  7. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  8. Dealing with Operating Leases in Valuation

    OpenAIRE

    Aswath Damodaran

    1999-01-01

    Most firm valuation models start with the after-tax operating income as a measure of the operating income on a firm and reduce it by the reinvestment rate to arrive at the free cash flow to the firm. Implicitly, we assume that the operating expenses do not include any financing expenses (such as interest expense on debt). While this assumption, for the most part, is true, there is a significant exception. When a firm leases an asset, the accounting treatment of the expense depends upon whethe...

  9. 12 CFR 714.10 - What other laws must you comply with when engaged in leasing?

    Science.gov (United States)

    2010-01-01

    ..., or provide the member with greater protections or benefits than the Consumer Leasing Act. You are... leasing? You must comply with the Consumer Leasing Act, 15 U.S.C. 1667-67f, and its implementing regulation, Regulation M, 12 CFR part 213. You must comply with state laws on consumer leasing, but only to...

  10. 30 CFR 285.437 - When can my lease or grant be canceled?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When can my lease or grant be canceled? 285.437... Administration Lease Or Grant Cancellation § 285.437 When can my lease or grant be canceled? (a) The Secretary will cancel any lease or grant issued under this part upon proof that it was obtained by fraud or...

  11. 25 CFR 213.6 - Leases for minerals other than oil and gas.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Leases for minerals other than oil and gas. 213.6 Section 213.6 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEASING OF... Leases for minerals other than oil and gas. Uncontested mining leases for minerals other than oil and gas...

  12. 12 CFR 714.7 - What are the insurance requirements applicable to leasing?

    Science.gov (United States)

    2010-01-01

    ... to leasing? 714.7 Section 714.7 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS LEASING § 714.7 What are the insurance requirements applicable to leasing? (a) You must maintain a contingent liability insurance policy with an endorsement for leasing or be named as...

  13. 30 CFR 285.210 - How does MMS initiate the competitive leasing process?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How does MMS initiate the competitive leasing... OCS Renewable Energy Leases Competitive Lease Process § 285.210 How does MMS initiate the competitive leasing process? The MMS may publish in the Federal Register a public notice of Request for Interest to...

  14. 30 CFR 285.436 - Can MMS require lease or grant contraction?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Can MMS require lease or grant contraction? 285... Administration Lease Or Grant Contraction § 285.436 Can MMS require lease or grant contraction? At an interval no more frequent than every 5 years, the MMS may review your lease or grant area to determine whether the...

  15. 30 CFR 285.202 - What types of leases will MMS issue?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What types of leases will MMS issue? 285.202 Section 285.202 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE... Renewable Energy Leases General Lease Information § 285.202 What types of leases will MMS issue? The MMS may...

  16. 25 CFR 215.6 - Applications for leases; consent of Indian owners.

    Science.gov (United States)

    2010-04-01

    ... a new lease be executed and delivered (or advertised for sale to the highest bidder) unless the... be personally incompetent to transact ordinary business affairs, has agreed to the terms of said lease or the terms under which said lease is advertised for lease, except in cases where the land is...

  17. Progress and future direction for the interim safe storage and disposal of Hanford high level waste (HLW)

    International Nuclear Information System (INIS)

    Wodrich, D.D.

    1996-01-01

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the US DOE and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described

  18. Elder Abuse Demonstration Project. Third Interim Report to the Illinois General Assembly on Public Acts 83-1259 and 83-1432.

    Science.gov (United States)

    Illinois State Dept. on Aging, Springfield.

    This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…

  19. Hanford Generic Interim Safety Basis

    Energy Technology Data Exchange (ETDEWEB)

    Lavender, J.C.

    1994-09-09

    The purpose of this document is to identify WHC programs and requirements that are an integral part of the authorization basis for nuclear facilities that are generic to all WHC-managed facilities. The purpose of these programs is to implement the DOE Orders, as WHC becomes contractually obligated to implement them. The Hanford Generic ISB focuses on the institutional controls and safety requirements identified in DOE Order 5480.23, Nuclear Safety Analysis Reports.

  20. Hanford Generic Interim Safety Basis

    International Nuclear Information System (INIS)

    Lavender, J.C.

    1994-01-01

    The purpose of this document is to identify WHC programs and requirements that are an integral part of the authorization basis for nuclear facilities that are generic to all WHC-managed facilities. The purpose of these programs is to implement the DOE Orders, as WHC becomes contractually obligated to implement them. The Hanford Generic ISB focuses on the institutional controls and safety requirements identified in DOE Order 5480.23, Nuclear Safety Analysis Reports

  1. An Integrated Model for a Water Leasing System on the Middle Rio Grand, New Mexico

    Science.gov (United States)

    Brookshire, D. S.; Coursey, D. L.; Tidwell, V. C.; Broadbent, C. D.

    2006-12-01

    motivated by a utility function specific to each water users needs. Currently twelve experiments have been run in four different climatic scenarios (decreasing, increasing, normal and dry water scenarios) for the generalized water leasing system, and the sophisticated farmer decision process. The results have shown the market to be robust, with multiple trades occurring in each trading year. The trading process is efficient with positive gains being realized from participation in the marketplace. This material is based upon work supported in part by SAHRA (Sustainability of semi-Arid Hydrology and Riparian Areas) under the STC Program of the National Science Foundation, Agreement No. EAR-9876800 and through Sandia National Laboratory Research and Development Program. Special thanks go to Kyle Carpenter, Ramon Vasquez, Ann Demint, for programming of various software components and to Jake Grandy and Frannie Miller for help in running the experiments.

  2. Remedying breaches or non-performance of the lease

    International Nuclear Information System (INIS)

    Sali, L.M.

    1998-01-01

    This paper discusses how natural gas and petroleum leases should be handled in the event of a dispute or non-performance, particularly in cases when the original parties to the lease have assigned their interests to others, which is currently a common practice. The most obvious concern is premature termination or default which, however, can be easily prevented by paying all delay rentals in a timely fashion, and at the proper address. In other types of default, most leases in use today contain a default clause which requires the party that asserts the existence of a default to serve notice to the party allegedly in default. Remedying the default is permitted, as it is in many other contracts. Interruptions in production is a frequent occasion for claiming default and many leases deal with shut-in production in special ways, but care must be exercised in interpreting the lease in question, for if there is an intention by the lessee to shut-in production due to economic or other considerations after the primary term expires there is virtually no way to bring that lease back to life, unless the facts clearly show that the parties knowingly effectively constructed a new lease

  3. Chemical leasing in the context of sustainable chemistry.

    Science.gov (United States)

    Moser, Frank; Karavezyris, Vassilios; Blum, Christopher

    2015-05-01

    Chemical leasing is a new and innovative approach of selling chemicals. It aims at reducing the risks emanating from hazardous substances and ensuring long-term economic success within a global system of producing and using chemicals. This paper explores how, through chemical leasing, the consumption of chemicals, energy, resources and the generation of related wastes can be reduced. It also analyses the substitution of hazardous chemicals as a tool to protect environmental, health and safety and hence ensure compliance with sustainability criteria. For this, we are proposing an evaluation methodology that seeks to provide an answer to the following research questions: (1) Does the application of chemical leasing promote sustainability in comparison to an existing chemicals production and management system? 2. If various chemical leasing project types are envisaged, which is the most promising in terms of sustainability? The proposed methodology includes a number of basic goals and sub-goals to assess the sustainability for eight different chemical leasing case studies that have been implemented both at the local and the national levels. The assessment is limited to the relative assessment of specific case studies and allows the comparisons of different projects in terms of their relative contribution to sustainable chemistry. The findings of our assessment demonstrate that chemical leasing can be regarded as promoting sustainable chemistry in five case studies with certainty. However, on the grounds of our assessment, we cannot conclude with certainty that chemical leasing has equivalent contribution to sustainable chemistry in respect of three further case studies.

  4. Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the Long-Term Care Hospital Prospective Payment System Policy Changes and Fiscal Year 2016 Rates; Revisions of Quality Reporting Requirements for Specific Providers, Including Changes Related to the Electronic Health Record Incentive Program; Extensions of the Medicare-Dependent, Small Rural Hospital Program and the Low-Volume Payment Adjustment for Hospitals. Final rule; interim final rule with comment period.

    Science.gov (United States)

    2015-08-17

    We are revising the Medicare hospital inpatient prospective payment systems (IPPS) for operating and capital related costs of acute care hospitals to implement changes arising from our continuing experience with these systems for FY 2016. Some of these changes implement certain statutory provisions contained in the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act), the Pathway for Sustainable Growth Reform(SGR) Act of 2013, the Protecting Access to Medicare Act of 2014, the Improving Medicare Post-Acute Care Transformation Act of 2014, the Medicare Access and CHIP Reauthorization Act of 2015, and other legislation. We also are addressing the update of the rate-of-increase limits for certain hospitals excluded from the IPPS that are paid on a reasonable cost basis subject to these limits for FY 2016.As an interim final rule with comment period, we are implementing the statutory extensions of the Medicare dependent,small rural hospital (MDH)Program and changes to the payment adjustment for low-volume hospitals under the IPPS.We also are updating the payment policies and the annual payment rates for the Medicare prospective payment system (PPS) for inpatient hospital services provided by long-term care hospitals (LTCHs) for FY 2016 and implementing certain statutory changes to the LTCH PPS under the Affordable Care Act and the Pathway for Sustainable Growth Rate (SGR) Reform Act of 2013 and the Protecting Access to Medicare Act of 2014.In addition, we are establishing new requirements or revising existing requirements for quality reporting by specific providers (acute care hospitals,PPS-exempt cancer hospitals, and LTCHs) that are participating in Medicare, including related provisions for eligible hospitals and critical access hospitals participating in the Medicare Electronic Health Record (EHR)Incentive Program. We also are updating policies relating to the

  5. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  6. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  7. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  8. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  9. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  10. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey. [Wayne Interim Storage Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  11. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  12. Interim report - geotechnical site assessment methodology. Vol.1

    International Nuclear Information System (INIS)

    Tunbridge, L.W.; Richards, L.R.

    1983-05-01

    An interim report summarizing the research conducted on geotechnical site assessment methodology at the Carwynnen test mine in Cornwall. The geological setting of the test site in the Cornubian granite batholith is described. The effect of structure imposed by discontinuities on the engineering behaviour of rock masses is discussed and the scanline survey method of obtaining data on discontinuities in the rock mass is described. The requirement for remote geophysical methods of characterizing the mass is discussed and initial experiments using seismic and ultrasonic velocity measurements are reported. Computer programs to perform statistical analysis of the discontinuity patterns are described. Overcoring and hydraulic fracturing methods of determining the in-situ stress are briefly described and the results of a programme of in-situ stress measurements using the overcoring method are reported. (author)

  13. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  14. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  15. 78 FR 79567 - National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods...

    Science.gov (United States)

    2013-12-31

    ... Program: Nutrition Standards for All Foods Sold in Schools as Required by the Healthy, Hunger-Free Kids... interim rule entitled National School Lunch Program and School Breakfast Program: Nutrition Standards for..., 2013 / Rules and Regulations [[Page 79567

  16. The Leasing Contract. Harmonizing National Legislation with the Lease Specific International Norms

    Directory of Open Access Journals (Sweden)

    Gheorghe Dinu

    2016-05-01

    Full Text Available By elaborating the proposed work, we want to bring theoretical contributions and enter a scientific domain which may not be at the beginning of its course to Romanian society, but which we consider to be able to handle improvements under doctrinaire and practical aspects. Objectively, we intend to reinforce the “statute” of leasing operations on a national level, operations which are still searching for their own identity, lacking any “legacy” gained from experience or historical post-December accumulations, and what has been gained has been assumed in a rush, under the influence of the Romanian society’s processes of democratization and European integration and are mechanical accumulations/teachings which resulted from the enforcement and necessity of complying with certain treaties and agreements which have not been sufficiently analyzed. Because they were taken in fractions, a series of norms resulted, lacking the consistency and sufficiency needed to improve education in the leasing domain, which has often led to contractual imbalances and a considerable decrease of the leasing market in Romania.

  17. The challenges facing the long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Iracane, D. [CEA Sacaly, Dir. de la Simulation et des Outils Experimentaux-DSOE, 91 - Gif sur Yvette (France); Marvy, A. [CEA Saclay, Dir. du Developpement et de l' Innovation Nucleares-DDIN, 91 - Gif Sur Yvette (France)

    2001-07-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  18. The challenges facing the long term interim storage

    International Nuclear Information System (INIS)

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  19. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  20. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  1. 30 CFR 282.15 - Cancellation of leases.

    Science.gov (United States)

    2010-07-01

    ... lease would probably cause serious harm or damage to life (including fish and other aquatic life), to... due to the failure of one or more partners to exercise due diligence, the innocent parties shall have...

  2. The application of chemical leasing business models in Mexico.

    Science.gov (United States)

    Schwager, Petra; Moser, Frank

    2006-03-01

    To better address the requirements of the changing multilateral order, the United Nations Industrial Development Organization (UNIDO) Cleaner Production Programme, in 2004, developed the new Sustainable Industrial Resource Management (SIRM) approach. This approach is in accordance with the principles decided at the United Nations Conference on Environment and Development (UNCED) in Rio de Janeiro, Brazil in 1992. Unlike the traditional approaches to environmental management, the SIRM concept captures the idea of achieving sustainable industrial development through the implementation of circular material and energy flows in the entire production chain and reduction of the amount of material and energy used with greater efficiency solutions. The SIRM approach seeks to develop new models to encourage a shift from selling products to supplying services, modifying, in this manner, the supplier/user relationship and resulting in a win-win situation for the economy and the environment. Chemical Leasing represents such a new service-oriented business model and is currently being promoted by UNIDO's Cleaner Production Programme. MAIN FEATURES. One of the potential approaches to address the problems related to ineffective use and over-consumption of chemicals is the development and implementation of Chemical Leasing business models. These provide concrete solutions to the effective management of chemicals and on the ways negative releases to the environment can be reduced. The Chemical Leasing approach is a strategy that addresses the obligations of the changing international chemicals policy by focusing on a more service-oriented strategy. Mexico is one of the countries that were selected for the implementation of UNIDO's demonstration project to promote Chemical Leasing models in the country. The target sector of this project is the chemical industry, which is expected to shift their traditional business concept towards a more service and value-added approach. This is

  3. 29 CFR 779.306 - Leased departments not separate establishments.

    Science.gov (United States)

    2010-07-01

    ... STANDARDS ACT AS APPLIED TO RETAILERS OF GOODS OR SERVICES Exemptions for Certain Retail or Service... leased departments, controls the space location, determines the type of goods that may be sold...

  4. 30 CFR 256.8 - Leasing maps and diagrams.

    Science.gov (United States)

    2010-07-01

    ... OIL AND GAS IN THE OUTER CONTINENTAL SHELF Outer Continental Shelf Oil, Gas, and Sulphur Management... any lease is offered or issued an area may be (1) withdrawn from disposition pursuant to section 12(a...

  5. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  6. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  7. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  8. HTGR market assessment: interim report

    International Nuclear Information System (INIS)

    1979-09-01

    The purpose of this Assessment is to establish the utility perspective on the market potential of the HTGR. The majority of issues and conclusions in this report are applicable to both the HTGR-Gas Turbine (GT) and the HTGR-Steam Cycle (SC). This phase of the HTGR Market Assessment used the HTGR-GT as the reference design as it is the present focus of the US HTGR Program. A brief system description of the HTGR-GT is included in Appendix A. This initial report provides the proposed structure for conducting the HTGR Market Assessment plus preliminary analyses to establish the magnitude and nature of key factors that affect the HTGR market. The HTGR market factors and their relationship to the present HTGR Program are discussed. This report discusses two of these factors in depth: economics and water availability. The water availability situation in the US and its impact on the potential HTGR market are described. The approach for applying the HTGR within a framework of utility systems analyses is presented

  9. El leasing financiero internacional en el tratado UNIDROIT

    OpenAIRE

    Flores Doña, Mª Sierra

    1998-01-01

    El Tratado UNIDROIT se refiere al contrato de leasing financiero internacional, esto es, al celebrado entre una Sociedad de leasing y un empresario con establecimientos (principal o secundario) situados en el territorio de dos Estados contratantes y caracterizado porque la primera adquiere elementos integrantes del patrimonio empresarial a un fabricante, según las instrucciones recibidas por su cliente y a quien se le entregará para su uso a cambio del pago de cuotas períodicas, al margen de ...

  10. Dynamic interaction between markets for leasing and selling automobiles

    OpenAIRE

    Andrikopoulos, Athanasios; Markellos, Raphael N.

    2015-01-01

    We develop a model of dynamic interactions between price variations in leasing and selling markets for automobiles. Our framework assumes a differential game between multiple Bertrand-type competing firms which offer differentiated products to forward-looking agents. Empirical analysis of our model using monthly US data from 2002 to 2011 shows that variations in selling (cash) market prices lead rapidly dissipating changes of leasing market prices in the opposite direction. We discuss the pra...

  11. Comparisons of Cooperative and Non-Cooperative Students: An Analysis of Student Accounting System Data. Interim Report, June, 1981.

    Science.gov (United States)

    Frazier, Don

    The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…

  12. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  13. Telecommunications Circuit Allocation Programs - Kansas City Area

    National Research Council Canada - National Science Library

    Thomas, William

    1994-01-01

    The overall objective of the audit was to determine whether DoD circuit allocation programs identified and used the most effective configurations for leased long-haul, special-purpose telecommunications circuits...

  14. 75 FR 18095 - America's Marine Highway Program

    Science.gov (United States)

    2010-04-09

    ... Marine Highway Transportation. Authority: Energy Independence and Security Act of 2007, Sections 1121...] RIN 2133-AB70 America's Marine Highway Program AGENCY: Maritime Administration, Department of... interim final rule that established America's Marine Highway Program, under which the Secretary will...

  15. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  16. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  17. THE EFFECTIVENESS OF THREE READING APPROACHES AND AN ORAL LANGUAGE STIMULATION PROGRAM WITH DISADVANTAGED CHILDREN IN THE PRIMARY GRADES--AN INTERIM REPORT AFTER ONE YEAR OF THE COOPERATIVE READING PROJECT.

    Science.gov (United States)

    DUNN, LLOYD M.; AND OTHERS

    THE EFFECTIVENESS OF THREE APPROACHES TO TEACHING BEGINNING READING AND THE INFLUENCE OF AN ORAL LANGUAGE STIMULATION PROGRAM ON THE DEVELOPMENT OF DISADVANTAGED CHILDREN IS REPORTED IN THE FIRST-YEAR REPORT OF A 2-YEAR INTERVENTION STUDY. SUBJECTS WERE 608 FIRST-GRADE PUPILS FROM 12 ELEMENTARY SCHOOLS IN AN INNER-CITY AREA. THE THREE EXPERIMENTAL…

  18. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  19. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  20. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  1. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  2. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  3. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  4. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  5. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  6. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  7. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  8. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  9. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  10. Central Gulf of Mexico lease sale draws weak industry response

    International Nuclear Information System (INIS)

    Koen, A.D.

    1992-01-01

    This paper reports that interest in oil and gas leases in the Gulf of Mexico continued spiraling downward at the latest Minerals Management Service offshore sale. Companies participating in Outer Continental Shelf Sale 139 last week in New Orleans offered 196 bids for 151 blocks in the central Gulf of Mexico. MMS offered 5,213 blocks for lease. The number of tracts receiving bids was the fewest at a central gulf lease sale since 114 tracts garnered high bids totaling $146.4 million at Sale 104 in April 1986. Apparent high bids in Sale 139 totaled $56,195,552, and all bids offered totaled just $65,300,864. Both bidding totals were the lowest in a Gulf of Mexico lease sale since MMS began area-wide gulf leasing at Sale 72 in May 1983. Only 64 of 93 qualified companies participated in Sale 139. Fifty-five companies offered apparent winning bids. By comparison, 123 companies at central gulf lease Sale 131 in March 1991 offered 637 bids totaling $320.5 million for 464 tracts. Apparent high bids last spring totaled $259.9 million. At central gulf lease Sale 123 in March 1990, high bids totaled $427.4 million for 538 tracts. In that sale, BP Exploration Inc. led all bidders, exposing $78 million in 79 high bids, including 60 for deepwater tracts. Since then, interest in deepwater tracts has waned in part because of sagging oil and gas prices as U.S. operators sought bigger prospects outside the U.S. Ironically, Sale 139 was dominated by the U.S. subsidiary of an Italian holding company

  11. Interim analysis: A rational approach of decision making in clinical trial.

    Science.gov (United States)

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  12. Interim analysis: A rational approach of decision making in clinical trial

    Directory of Open Access Journals (Sweden)

    Amal Kumar

    2016-01-01

    Full Text Available Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  13. 75 FR 21506 - Magnet Schools Assistance Program

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF EDUCATION 34 CFR Part 280 RIN 1855-AA07 [Docket ID ED-2010-OII-0003] Magnet Schools Assistance Program AGENCY: Office of Innovation and Improvement, Department of Education. ACTION: Interim... in the Federal Register an interim final rule and requested comments on that rule for the Magnet...

  14. 41 CFR 102-73.130 - When may Federal agencies consider acquiring leases with purchase options?

    Science.gov (United States)

    2010-07-01

    ... consider leasing with a purchase option at or below fair market value, consistent with the lease-purchase... and other advantages to the Government and is consistent with the Government's goals. (b) The...

  15. Analisis Yuridis Tentang Berlakunya Force Majeur Terhadap Wanprestasi Dalam Kontrak Leasing

    OpenAIRE

    Sidauruk, Masnur

    2011-01-01

    Dengan berkembangnya kegiatan ekonomi nasional, maka berkembang jugalah kegiatan masyarakat dalam bidang usaha ekonomi. Kegiatan usaha yang saat ini banyak berkembang di masyarakat adalah sewa guna usaha atau yang biasa disebut dengan leasing. Leasing adalah kegiatan pembiayaan dalam bentuk penyediaan barang modal baik secara Sewa Guna Usaha dengan hak opsi (Finance Lease) maupun Sewa Guna Usaha tanpa hak opsi (Operating Lease) untuk digunakan oleh Penyewa Guna Usaha (Lessee) selama jangka w...

  16. The Commercial Office Market and the Markup for Full Service Leases

    OpenAIRE

    Jonathan A. Wiley; Yu Liu; Dongshin Kim; Tom Springer

    2014-01-01

    Because landlords assume all of the operating expense risk, rents for gross leases exceed those for net leases. The markup, or spread, for gross leases varies between properties and across markets. Specifically, the markup is expected to increase with the cost of real estate services at the property, and to be influenced by market conditions. A matching procedure is applied to measure the services markup as the percentage difference between the actual rent on a gross lease relative to the act...

  17. 76 FR 19909 - International Terrorism Victim Expense Reimbursement Program

    Science.gov (United States)

    2011-04-11

    ... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...

  18. Decision Tree Approach to Discovering Fraud in Leasing Agreements

    Directory of Open Access Journals (Sweden)

    Horvat Ivan

    2014-09-01

    Full Text Available Background: Fraud attempts create large losses for financing subjects in modern economies. At the same time, leasing agreements have become more and more popular as a means of financing objects such as machinery and vehicles, but are more vulnerable to fraud attempts. Objectives: The goal of the paper is to estimate the usability of the data mining approach in discovering fraud in leasing agreements. Methods/Approach: Real-world data from one Croatian leasing firm was used for creating tow models for fraud detection in leasing. The decision tree method was used for creating a classification model, and the CHAID algorithm was deployed. Results: The decision tree model has indicated that the object of the leasing agreement had the strongest impact on the probability of fraud. Conclusions: In order to enhance the probability of the developed model, it would be necessary to develop software that would enable automated, quick and transparent retrieval of data from the system, processing according to the rules and displaying the results in multiple categories.

  19. 13 CFR 120.871 - Leasing part of Project Property to another business.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Leasing part of Project Property....871 Leasing part of Project Property to another business. (a) The costs of interior finishing of space to be leased out to another business are not eligible Project costs. (b) Third-party loan proceeds...

  20. 30 CFR 285.408 - May I assign my lease or grant interest?

    Science.gov (United States)

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Lease and Grant... application to MMS. The assignment application must include: (1) The MMS-assigned lease or grant number; (2) A... required financial assurance. (c) If you submit an application to assign a lease or grant, you will...

  1. 24 CFR 982.616 - Shared housing: Lease and HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Shared housing: Lease and HAP... Types Shared Housing § 982.616 Shared housing: Lease and HAP contract. For assistance in a shared housing unit, there is a separate HAP contract and lease for each assisted family. ...

  2. 24 CFR 982.607 - Congregate housing: Lease and HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Congregate housing: Lease and HAP... Types Congregate Housing § 982.607 Congregate housing: Lease and HAP contract. For congregate housing, there is a separate lease and HAP contract for each assisted family. ...

  3. 24 CFR 982.611 - Group home: Lease and HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Group home: Lease and HAP contract... Types Group Home § 982.611 Group home: Lease and HAP contract. For assistance in a group home, there is a separate HAP contract and lease for each assisted person. ...

  4. 43 CFR 19.8 - Prospecting, mineral locations, mineral patents, and mineral leasing within National Forest...

    Science.gov (United States)

    2010-10-01

    ... patents, and mineral leasing within National Forest Wilderness. 19.8 Section 19.8 Public Lands: Interior... § 19.8 Prospecting, mineral locations, mineral patents, and mineral leasing within National Forest... locations, mineral patents, and mineral leasing within National Forest Wilderness are contained in parts...

  5. 12 CFR 714.2 - What are the permissible leasing arrangements?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false What are the permissible leasing arrangements? 714.2 Section 714.2 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING... leasing. In direct leasing, you purchase personal property from a vendor, becoming the owner of the...

  6. 12 CFR 714.6 - Are you required to retain salvage powers over the leased property?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Are you required to retain salvage powers over the leased property? 714.6 Section 714.6 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS LEASING § 714.6 Are you required to retain salvage powers over the leased...

  7. Farm Equipment Leasing. A New Financial Strategy. Staff Report No. AGES870302.

    Science.gov (United States)

    Serletis, William S.

    For farmers with high debt/asset ratios, leasing is an attractive option for securing the use of farm machinery. Under the current tax laws, financial leasing carries lower after-tax costs than loan purchasing. By size, farms with more than $500,000 in sales had the highest proportion of U.S. expenditures for farm equipment leasing. By region, the…

  8. 30 CFR 203.63 - Does my application have to include all leases in the field?

    Science.gov (United States)

    2010-07-01

    ...) The Regional Director maintains a Field Names Master List with updates of all leases in each... application for all leases that are part of the designated field on the date of application, except as... eventually become part of the authorized field. Therefore, if you have any other leases that you believe may...

  9. 18 CFR 367.1011 - Account 101.1, Property under capital leases.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 101.1, Property under capital leases. 367.1011 Section 367.1011 Conservation of Power and Water Resources FEDERAL ENERGY... date, (4) Original cost or fair market value of property leased, (5) Future minimum lease payments, (6...

  10. 75 FR 32221 - Whirlpool Corporation, Evansville Division, Including On-Site Leased Workers from Andrews...

    Science.gov (United States)

    2010-06-07

    ..., Evansville Division, Including On-Site Leased Workers from Andrews International, Inc., Evansville, IN... that workers leased from Andrews International, Inc. were employed on-site at the Evansville, Indiana... findings, the Department is amending this certification to include leased workers from Andrews...

  11. 75 FR 41895 - Whirlpool Corporation, Evansville Division, Including On-Site Leased Workers From Andrews...

    Science.gov (United States)

    2010-07-19

    ..., Evansville Division, Including On-Site Leased Workers From Andrews International, Inc., M.H. Equipment, and... 10321). The notice was amended on May 25, 2010 to include on-site leased workers from Andrews... workers of Whirlpool Corporation, Evansville Division, including on-site leased workers from Andrews...

  12. 76 FR 26178 - Modifications to Treatment of Aircraft and Vessel Leasing Income

    Science.gov (United States)

    2011-05-06

    ... Modifications to Treatment of Aircraft and Vessel Leasing Income AGENCY: Internal Revenue Service (IRS... final regulations addressing the treatment of certain income and assets related to the leasing of... controlled foreign corporations that derive income from the leasing of aircraft or vessels in foreign...

  13. 49 CFR 604.8 - Leasing FTA funded equipment and drivers.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Leasing FTA funded equipment and drivers. 604.8... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CHARTER SERVICE Exceptions § 604.8 Leasing FTA funded equipment and drivers. (a) A recipient may lease its FTA-funded equipment and drivers to registered charter providers...

  14. 30 CFR 285.231 - How will MMS process my unsolicited request for a noncompetitive lease?

    Science.gov (United States)

    2010-07-01

    ... a noncompetitive lease? 285.231 Section 285.231 Mineral Resources MINERALS MANAGEMENT SERVICE... described in §§ 285.640 through 285.648. (e) The MMS will coordinate and consult with affected Federal.... (1) Within 10 business days after you receive the lease copies you must: (i) Execute the lease; (ii...

  15. 12 CFR 616.6300 - Leasing policies, procedures, and underwriting standards.

    Science.gov (United States)

    2010-01-01

    ... property and associated risks; (e) Property tax and sales tax reporting; (f) Title and ownership of leased... engaged in lease underwriting must adopt a written policy (or policies). Management, at the direction of the board, must develop procedures that reflect lease practices that control risk and comply with all...

  16. 36 CFR 18.5 - May property be leased without receiving fair market value rent?

    Science.gov (United States)

    2010-07-01

    ... without receiving fair market value rent? 18.5 Section 18.5 Parks, Forests, and Public Property NATIONAL... leased without receiving fair market value rent? Property may be leased under this part only if the lease requires payment of rent to the government equal to or higher than the property's fair market value rent...

  17. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  18. Uranium exploration of the Colorado Plateau: interim staff report

    International Nuclear Information System (INIS)

    1980-10-01

    This report is an issue of the original draft copy of the Interim Staff Report on Uranium Exploration on the Colorado Plateau, dated June 1951. The original draft copy was only recently located and is being published at this time because of the interest in the contained historical content. The table of contents of this report lists: history of uranium mining; geology; proposed program for the geologic investigations section; general activities of industry and government; and future exploration of sedimentary uranium deposits and anticipated results. Under the proposed program section are: future of the copper-uranium deposits as a source of uranium; uraniferous asphaltite deposits; and commission exploration and future possibilities. The section on general activities of industry and government includes: exploratory and development drilling; field investigations and mapping; early geologic investigations and investigations by the US geological survey; and geophysical exploration. Tables are also presented on: uranium production by districts; US Geological survey drilling statistics; Colorado Exploration Branch drilling statistics; summary of drilling projects; and comparative yearly core-drill statistics on the Colorado Plateau

  19. Interim Evaluation of the Project P.A.T.H.S.: Findings Based on Different Datasets

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available Interim evaluation studies were carried out in order to examine the implementation details of the Tier 1 Program of the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes in Hong Kong. Quantitative results of the interim evaluation findings based on eight datasets collected from 2006 to 2009 are reported in this paper. Three hundred and seventy-eight schools were randomly selected to provide information on the implementation details of the program via face-to-face interviews, telephone interviews, and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. In conjunction with other process evaluation findings, the present study suggests that the implementation quality of the Tier 1 Program of the Project P.A.T.H.S. is high. The present study also provides support for the effectiveness of the Tier 1 Program of the Project P.A.T.H.S. in Hong Kong.

  20. Land lease contract and prior right of lessee to concluding the new land lease contract - case of Slovakia

    Directory of Open Access Journals (Sweden)

    Anna Bandlerová

    2016-12-01

    Full Text Available Land lease is one of the few possible ways to use the agricultural land effectively. This is caused by problems in the proprietary and user relationships, therefore the agricultural land lease and its legal regulation is especially important for Slovakia. This paper deals with the selected legal arrangements related to the agricultural land lease in Slovakia with an objective to identify application problems faced by lessees and lessors of agricultural land. When regulating the agricultural land lease relationships, the Slovak law maker prefers dispositive legal norms. However, this method is rarely used in the application practice. Contracting parties often focus only on obligatory characters of the contract, relying on the legal text of dispositive provisions. The legal arrangement of the lessee’s prior right to sign the new lease contract attracts a particular attention. Current legal regulation of this lessee’s right seems to be unenforceable; on the other hand, it collides with the basic human rights. This provision needs to be either cancelled or adjusted so that it achieves the objective defined by the law maker and so that it is legally enforceable in compliance with superior legal norms.

  1. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  2. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  3. Environmental Assessment of Beale AFB Grazing Lease Program

    Science.gov (United States)

    2012-12-01

    Beale AFB will use livestock (cattle, sheep and goats ) on its properties throughout the year as needed for the control of noxious weeds, reduction...initiating a wildfire. California Farm Bureau Federation policy recognizes that grazing is the most practical and environmentally acceptable way to...Site Monitoring Well Installation and Annual Targeted Goat Grazing Project, Placer County, California. 21 September 2011.  

  4. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  5. Hierarchies of belief and interim rationalizability

    Directory of Open Access Journals (Sweden)

    Jeffrey C. Ely

    2006-03-01

    Full Text Available In games with incomplete information, conventional hierarchies of belief are incomplete as descriptions of the players' information for the purposes of determining a player's behavior. We show by example that this is true for a variety of solution concepts. We then investigate what is essential about a player's information to identify behavior. We specialize to two player games and the solution concept of interim rationalizability. We construct the universal type space for rationalizability and characterize the types in terms of their beliefs. Infinite hierarchies of beliefs over conditional beliefs, which we call Delta-hierarchies, are what turn out to matter. We show that any two types in any two type spaces have the same rationalizable sets in all games if and only if they have the same Delta-hierarchies.

  6. Safety regulations for radioisotopes, etc. (interim report)

    International Nuclear Information System (INIS)

    1980-01-01

    An (interim) report by an ad hoc expert committee to the Nuclear Safety Commission, on the safety regulations for radioisotopes, etc., was presented. For the utilization of radioisotopes, etc., there is the Law Concerning Prevention of Radiation Injury Due to Radioisotopes, etc. with the advances in this field and the improvement in international standards, the regulations by the law have been examined. After explaining the basic ideas of the regulations, the problems and countermeasures in the current regulations are described: legal system, rationalization in permission procedures and others, inspection on RI management, the system of the persons in charge of radiation handling, RI transport, low-level radioactive wastes, consumer goods, definitions of RIs, radiation and sealed sources, regulations by group partitioning, RI facilities, system of personnel exposure registration, entrusting of inspection, etc. to private firms, and reduction in the works for permission among governmental offices. (author)

  7. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    International Nuclear Information System (INIS)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs

  8. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs.

  9. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  10. Gulf-Wide Information System, Environmental Sensitivity Index Oyster Leases, Geographic NAD83, LDWF (2001) [esi_oyster_lease_LDWF_2001

    Data.gov (United States)

    Louisiana Geographic Information Center — This data set contains Environmental Sensitivity Index (ESI) oyster leases data of coastal Louisiana. The ESI is a classification and ranking system, which...

  11. Strategic Review of Medical Training and Career Structure Interim Report

    OpenAIRE

    Department of Health (Ireland)

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  12. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  13. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  14. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  15. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  16. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  17. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    Science.gov (United States)

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  18. Interim report on long range plan for nuclear physics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  19. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  20. Model for low temperature oxidation during long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne [Service de la Corrosion et du Comportement des Materiaux dans leur Environnement, CEA/Saclay - 91191 Gif-sur-Yvette Cedex (France); Poquillon, Dominique; Monceau, Daniel [CIRIMAT UMR 5085, ENSIACET-INPT, 31077 Toulouse Cedex 4 (France)

    2004-07-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  1. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    Science.gov (United States)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  2. Model for low temperature oxidation during long term interim storage

    International Nuclear Information System (INIS)

    Desgranges, Clara; Bertrand, Nathalie; Gauvain, Danielle; Terlain, Anne; Poquillon, Dominique; Monceau, Daniel

    2004-01-01

    For high-level nuclear waste containers in long-term interim storage, dry oxidation will be the first and the main degradation mode during about one century. The metal lost by dry oxidation over such a long period must be evaluated with a good reliability. To achieve this goal, modelling of the oxide scale growth is necessary and this is the aim of the dry oxidation studies performed in the frame of the COCON program. An advanced model based on the description of elementary mechanisms involved in scale growth at low temperatures, like partial interfacial control of the oxidation kinetics and/or grain boundary diffusion, is developed in order to increase the reliability of the long term extrapolations deduced from basic models developed from short time experiments. Since only few experimental data on dry oxidation are available in the temperature range of interest, experiments have also been performed to evaluate the relevant input parameters for models like grain size of oxide scale, considering iron as simplified material. (authors)

  3. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  4. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  5. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  6. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  7. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  8. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  9. Basis for Interim Operation for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2003-01-01

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  10. Interim results from UO2 fuel oxidation tests in air

    International Nuclear Information System (INIS)

    Campbell, T.K.; Gilbert, E.R.; Thornhill, C.K.; White, G.D.; Piepel, G.F.; Griffin, C.W.j.

    1987-08-01

    An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO 2 , fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO 2 pellets in the temperature range of 135 to 250 0 C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 10 5 R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 10 5 R/h gamma field. 33 refs., 51 figs., 6 tabs

  11. 24 CFR 882.511 - Lease and termination of tenancy.

    Science.gov (United States)

    2010-04-01

    ... CFR part 5, subpart L, in all cases where domestic violence, dating violence, or stalking, or criminal activity directly related to domestic violence, dating violence, or stalking is involved or claimed to be... prohibited by HUD. (2) The lease must provide that drug-related criminal activity engaged in on or near the...

  12. 7 CFR 3560.408 - Lease of security property.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Lease of security property. 3560.408 Section 3560.408 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT OF... facilities related to a housing project (e.g., central kitchens, recreation facilities, laundry rooms, and...

  13. Scooter Leasing : A Cradle-to-Cradle Sound Strategy?

    NARCIS (Netherlands)

    Peters, F.H.J.; De Brito, M.P.

    2010-01-01

    This article investigates the application of the Cradle-to-Cradle approach to the electric scooter vehicle, and how the concept of leasing can be used as a means to make it operational. This research is a result of a research project with Eco-Movement, a Dutch firm currently selling electric

  14. 78 FR 48343 - Reporting and Paying Royalties on Federal Leases

    Science.gov (United States)

    2013-08-08

    ... Federal Government may benefit because (1) the reduced burden of reporting may extend the life on marginal... its leases in the unit or communitization agreement. These imbalances led to numerous questions about... a member of such staff is required to perform work on a specific case. Section 304(b) of FLPMA...

  15. Leases – Public Discussion of a New Common Standard

    OpenAIRE

    Valášková, Mariana

    2011-01-01

    The paper focus on the importance of public discussion for developing a new common standard in case of topical lease accounting. To stimulate the public discussion the IASB and the FASB have done several outreach activities and going to continue in obtaining more views from stakeholders

  16. 76 FR 64099 - Notice of Competitive Coal Lease Sale, Wyoming

    Science.gov (United States)

    2011-10-17

    .... The tract will be leased to the qualified bidder of the highest cash amount provided that the high bid...-way as required by typical mining practices. The total mineable stripping ratio of the coal in bank... containing approximately 0.27 percent sulfur. These quality averages place the coal reserves at the high end...

  17. Buying and leasing real estate for veterinary hospitals.

    Science.gov (United States)

    Salzsieder, Karl R

    2006-03-01

    The major factors to be considered in the real estate purchase decision are the interest rate, the depreciation schedule, the property appreciation, the income tax impact, and the impact of paying a principal payment as part of the real estate mortgage. All these factors must be compared with the costs of leasing.

  18. 32 CFR 644.135 - Lease authorization and approvals.

    Science.gov (United States)

    2010-07-01

    ... work to the Government for the expected life of the lease shall be less than the cost of alternative... geographical area in which the availability of Government-owned space was surveyed, together with reasons for limiting the area. The mission is to be set forth in detail, along with the reason(s) why space in this...

  19. Leasing Retirees: Smart Business or Gaming the System?

    Science.gov (United States)

    Lawton, Stephen B.

    2009-01-01

    In April 2009, a high school principal in a large Arizona school district met individually with 18 of his most senior teachers to inform them that they would not have a job the following year. Why didn't tenure protect them from wholesale dismissal? The answer is they all had one thing in common: they were retirees who had been leased or hired…

  20. RELATIVE PROLIFERATION RISKS FOR NUCLEAR FUEL LEASING ARRANGEMENT

    International Nuclear Information System (INIS)

    CHENG, L.Y.; YUE, M.; BARI, R.A.

    2007-01-01

    The present study demonstrates a probabilistic approach to quantify the proliferation risks of fuel leasing and recycling. A Markov model approach is applied to evaluate the probability of proliferation success by diversion or theft. Proliferation risk is calculated as a product of the probability of success and the corresponding consequences

  1. 47 CFR 76.975 - Commercial leased access dispute resolution.

    Science.gov (United States)

    2010-10-01

    ... declaration and the party submitting the protected material. The Commission has full authority to fashion... leased access complaint within 90 days of the close of the pleading cycle. (2) The Media Bureau, after... the proposals or choose to fashion its own remedy. (i) During the pendency of a dispute, a party...

  2. Lessee's obligations under the oil and gas lease

    International Nuclear Information System (INIS)

    Malcolm, R.T.

    1998-01-01

    Obligations of a lessee under the present day freehold petroleum and natural gas lease are described. The effect of recent cases relating to fiduciary and good faith duties on the lessee's obligations are also examined. Every lease under the Canadian Association of Petroleum Landmen (CAPL) must specifically deal with rights to be granted, the obligations to drill, royalties, the length of the primary term, the amount of the rental rights, rights to pool, and offset obligations. In Alberta, the most accepted petroleum and natural gas lease form is the CAPL 91. This form is presently being revised to create the 1998 version. The contents of this discussion included: (1) historical lease interpretation, (2) fiduciary obligations, (3) the definition of the doctrine of good faith, (4) implied and express covenants, (5) application of the default clause and (6) force majeur provisions. Although Alberta law does not recognize the doctrine of good faith, nevertheless the court will review the obligations of the lessee and if they do not feel that the lessee has acted fairly with respect to the lessor and damages have resulted, the court will find for the lessor

  3. 26 CFR 48.4217-1 - Lease considered as sale.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Lease considered as sale. 48.4217-1 Section 48... article by a manufacturer, producer, or importer shall be considered a sale of the article. The term “lease” means a contract or agreement, written or verbal, which gives the lessee an exclusive, continuous...

  4. Lease accounting trouble looms for corporate real estate management

    NARCIS (Netherlands)

    Baltussen, S.; Schelle, T.G.F.; Appel - Meulenbroek, H.A.J.A.; van Egmond, B.; Hesselink, M.; Leersum, van L.

    2014-01-01

    Purpose – The purpose of this paper is to investigate what impact International Financial Reporting Standards (IFRS) lease accounting changes might have on corporate real estate (CRE) strategies, and what the consequences for future corporate real estate portfolio decisions might be.

  5. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    Energy Technology Data Exchange (ETDEWEB)

    COVEY, L.I.

    2000-11-28

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.

  6. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    International Nuclear Information System (INIS)

    COVEY, L.I.

    2000-01-01

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, 90 Sr and 137 Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the 137 Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF

  7. 77 FR 1743 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs

    Science.gov (United States)

    2012-01-11

    ... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs... Appendix C are to be used for cost-effectiveness analysis, including lease-purchase analysis, as specified... (Revised December 2011) Discount Rates for Cost-Effectiveness, Lease Purchase, and Related Analyses...

  8. 76 FR 7881 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs

    Science.gov (United States)

    2011-02-11

    ... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs... Appendix C are to be used for cost-effectiveness analysis, including lease-purchase analysis, as specified... (Revised December 2010) DISCOUNT RATES FOR COST-EFFECTIVENESS, LEASE PURCHASE, AND RELATED ANALYSES...

  9. 78 FR 6140 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs

    Science.gov (United States)

    2013-01-29

    ... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs... in Appendix C are to be used for cost-effectiveness analysis, including lease-purchase analysis, as...) Discount Rates for Cost-Effectiveness, Lease Purchase, and Related Analyses Effective Dates. This appendix...

  10. Program Management Challenges in a Joint Service Environment

    National Research Council Canada - National Science Library

    Taneyhill, Dorothy E

    2007-01-01

    ... or modifications of the same design. The Interim Defense Acquisition Guidebook defines a Joint Program Management Office as any defense acquisition system, subsystem, component, or technology program that involves formal management...

  11. A Procedure for Structural Weight Estimation of Single Stage to Orbit Launch Vehicles (Interim User's Manual)

    Science.gov (United States)

    Martinovic, Zoran N.; Cerro, Jeffrey A.

    2002-01-01

    This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.

  12. Senior Program Officer, Evaluation | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... provides technical assistance to program staff and partners on evaluation ... monitoring and evaluation approaches; working with colleagues to maintain the ... provides technical supervision and assistance, including analysis of interim ...

  13. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  14. Wayne Interim Storage Site: Annual environmental report for calendar year 1990, Wayne, New Jersey

    International Nuclear Information System (INIS)

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Wayne Interim Storage Site (WISS) (a National Priorities List site) and surrounding area began in 1984. WISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Sediment samples were also analyzed for thorium-230, and several nonradiological parameters were measured in groundwater. 16 refs., 12 figs., 23 tabs

  15. Colonie Interim Storage Site: Annual environmental report for calendar year 1990, Colonie, New York

    International Nuclear Information System (INIS)

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Colonie Interim Storage Site (CISS) and surrounding area began in 1984. CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sties where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The routine environmental monitoring program at CISS includes sampling networks for external gamma radiation exposures and for radium-226, throium-232, an total uranium concentrations in surface water, sediment, and groundwater. Additionally, the nonradiological parameters volatile and semivolatile organics, pesticides/polychlorinated biphenyls (PCBs), metals, total organic carbon (TOC), total organic halides (TOX), specific conductivity, and pH are measured in groundwater. 14 refs., 20 figs., 25 tabs

  16. Interim Impacts of the POWER through Choices Program

    Science.gov (United States)

    Goesling, Brian; Covington, Reginald D.; Manlove, Jennifer; Barry, Megan; Oman, Roy F.; Veseley, Sara

    2015-01-01

    Some of the nation's most vulnerable youth are those living in foster care and other out-of-home settings. Many such youth have experienced abuse and neglect, face mental health and substance abuse challenges, and struggle with serious behavioral problems (Casanueva et al. 2014). They are more likely than their peers to have academic struggles and…

  17. A pavement management research program for Oregon highways : interim report.

    Science.gov (United States)

    1985-03-01

    This is the first in a series of reports documenting progress on a statewide pavement management research project. The overall project is conducting research into pavement life cycles of different rehabilitation treatment; the cost-effectiveness of e...

  18. Implementing an Indigenous Community Education Program: An Interim Report.

    Science.gov (United States)

    Nabokov, Peter

    Institutional success of an instructional model that featured peer instruction, a strict performance orientation, and an insistence on mastery of specific skills led developers to believe the same model could be used by communities to disseminate skills and information at low cost and with efficiency. The system was utilized in setting up an…

  19. Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tartakovsky, Guzel D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Timothy C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chronister, Glen B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-01

    A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

  20. High Temperature Materials Interim Data Qualification Report FY 2011

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2011-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim fiscal year (FY) 2011 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under the Nuclear Quality Assurance (NQA)-1 guidelines and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from seven test series within the High Temperature Materials data stream have been entered into the NDMAS vault, including tensile tests, creep tests, and cyclic tests. Of the 5,603,682 records currently in the vault, 4,480,444 have been capture passed, and capture testing is in process for the remaining 1,123,238.

  1. 30 CFR 203.71 - How does MMS allocate a field's suspension volume between my lease and other leases on my field?

    Science.gov (United States)

    2010-07-01

    ... RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Pre-Act Deep Water Leases and for Development... or post-November 2000 deep water lease to your field after we approve your application We will not..., or the minimum suspension volume of the authorized field, whichever is greater (i) You toll the time...

  2. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  3. Interim Basis for PCB Sampling and Analyses

    International Nuclear Information System (INIS)

    BANNING, D.L.

    2001-01-01

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the US. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposal approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QAlG4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842/Rev.1 A, Vol. IV, Section 4.16 (Banning 1999)

  4. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    Science.gov (United States)

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  5. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  6. The Growing Importance and Value Implications of Recreational Hunting Leases to Agricultural Land Investors in America

    OpenAIRE

    John S. Baen

    1997-01-01

    This study considers the evolution and explosion growth of recreational hunting leases in America. The traditional European practice of leasing rural lands for the exclusive rights of tenants to hunt and fish is now an important revenue source for American agricultural land investors/owners. Hunting lease income can enhance value to the point that recreation becomes the highest and best use of rural land for both the market and income approaches to valuation. This study offers new perspective...

  7. Competitive bidding for OCS leases and environmental risk

    International Nuclear Information System (INIS)

    Englin, J.E.; Klan, M.S.

    1990-01-01

    In the last few years, the role of environment has become increasingly contentious in the process of competitive bidding for exploration and development rights of offshore petroleum leases in the outer continental shelf (OCS). Although an extensive literature exists on OCS leasing per se, relatively little work focuses on the role of environmental factors. This paper examines the effect on environmental risk on the number of firms (or joint ventures) entering bids for a given tract, which relates to the effective competition for the tracts. The next section outlines a theoretical model of bidding behavior under environmental risk. The third section presents the data used to estimate the model. The fourth section gives empirical results of an analysis of Sale No. 42, conducted in 1979 for Georges Bank in the North Atlantic. The last section provides concluding remarks

  8. LEASE AGREEMENTS FINANCIAL REPORTING ISSUES ACCORDING TO THE INTERNATIONAL STANDARDS

    Directory of Open Access Journals (Sweden)

    Marina MAISURADZE

    2016-08-01

    Full Text Available On January 13th 2016, the Board for International Accounting Standards  published the  new International Standard 16 of Financial Reporting,   named as “Lease”, which will substitute the International Accounting Standard 17 of financial reporting “Lease”. ISFR 16 ensures reflection of practically all lease agreements in the financial reporting, which, in is part, meets the requirements of investors regarding reliability and transparency of the information related to a financial state of an enterprise. The Article considers the changes caused by ISFR 16, which relate to recognition of the lease agreements as the asset, their accounting and, impact on the financial reporting. Relevant conclusions are provided regarding the above mentioned issues.

  9. The Feasibility of Solar Panel Leasing in Finland

    OpenAIRE

    Nyberg, Nico

    2016-01-01

    The aim of this thesis was to analyse the feasibility of solar panel leasing in Finland. The research was conducted using the exploratory research design, utilizing both qualitative and quantitative data. The data was collected from secondary sources, e.g. industry reports, government publications, and newspaper articles. During the literature review, methods for answering the thesis question were recognized. The chosen method was to analyse the market and industry feasibility, product or ser...

  10. Competitive Analysis for Online Leasing Problem with Compound Interest Rate

    OpenAIRE

    Yang, Xingyu; Zhang, Weiguo; Xu, Weijun; Zhang, Yong

    2011-01-01

    We introduce the compound interest rate into the continuous version of the online leasing problem and discuss the generalized model by competitive analysis. On the one hand, the optimal deterministic strategy and its competitive ratio are obtained; on the other hand, a nearly optimal randomized strategy is constructed and a lower bound for the randomized competitive ratios is proved by Yao's principle. With the help of numerical examples, the theoretical results show that the interest rate pu...

  11. Battery Ownership Model - Medium Duty HEV Battery Leasing & Standardization

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Ken; Smith, Kandler; Cosgrove, Jon; Prohaska, Robert; Pesaran, Ahmad; Paul, James; Wiseman, Marc

    2015-12-01

    Prepared for the U.S. Department of Energy, this milestone report focuses on the economics of leasing versus owning batteries for medium-duty hybrid electric vehicles as well as various battery standardization scenarios. The work described in this report was performed by members of the Energy Storage Team and the Vehicle Simulation Team in NREL's Transportation and Hydrogen Systems Center along with members of the Vehicles Analysis Team at Ricardo.

  12. LDEF materials: An overview of the interim findings

    International Nuclear Information System (INIS)

    Stein, B.A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effect (SEE) on materials that are unparalleled in the history of the U.S. space program. The 5.8-year flight of LDEF greatly enhanced the potential value of materials data from LDEF to the international SEE community, compared to that of the original 1-year flight plan. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials of the same space vehicle. NASA recognized the potential by forming the LDEF Space Environmental Effects on Materials Special Investigation Group (MSIG) to address the greatly expanded materials and LEO space environment parameter analysis opportunities available in the LDEF structure, experiment trays, and corollary measurements, so that the combined value of all LDEF materials data to current and future space missions will be assessed and documented. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. These revelations are based on observations of LEO environmental effects on materials made in-space during LDEF retrieval and during LDEF tray deintegration at the Kennedy Space Center, and on findings of approximately 1.5 years of laboratory analyses of LDEF materials by the LDEF materials scientists. These findings were extensively reviewed and discussed at the MSIG-sponsored LDEF Materials Workshop '91. The results are presented in a format which categorizes the revelations as clear findings or confusing/unexplained findings and resultant needs for new space materials developments and ground simulation testing/analytical modeling

  13. Case studies of geothermal leasing and development on federal lands

    Energy Technology Data Exchange (ETDEWEB)

    Trummel, Marc

    1978-09-29

    In response to a widely expressed need to examine the impact of the federal regulatory system on the rate of geothermal power development, the Department of Energy-Division of Geothermal Energy (DGE) has established a Streamlining Task Force in cooperation with appropriate federal agencies. The intent is to find a way of speeding development by modification of existing laws or regulations or by better understanding and mechanization of the existing ones. The initial focus was on the leasing and development of federal lands. How do the existing processes work? Would changes produce positive results in a variety of cases? These are questions which must be considered in a national streamlining process. This report presents case studies of federal leasing actions on seven diverse locations in the western region. Characteristics of existing high geothermal potential areas are quite diverse; geography, environment, industry interest and the attitudes and activities of the responsible federal land management agencies and the interested public vary widely. Included are descriptions of post and current activities in leasing exploration and development and discussions of the probable future direction of activities based on current plans. Implications of these plans are presented. The case studies were based on field interviews with the appropriate State and District BLM officer and with the regional forester's office and the particular forest office. Documentation was utilized to the extent possible and has been included in whole or in part in appendices as appropriate.

  14. Leasing as a Source of Finance by the Major US Airlines: Hidden Debt and its Changes Over Time

    Science.gov (United States)

    Gritta, Richard D.; Lippman, Ellen J.

    2003-01-01

    This paper updates prior research on aircraft leasing and contrasts the findings of current data with prior results. Usage of leases by air carriers is a means to lessen the impact of financial obligations from fleet purchases. The study revisits two previous studies, one in 1969 and one in 1991, which is analyzed the incidence of leases by major air carriers. The current study updates these past studies to consider air carriers current usage of leases. Additionally, since operating leases are not reflected in the balance sheets of airlines, operating lease information was capitalized using a present value of future operating lease payments. Then, financial debt burden ratios were computed to determine the impact from the capitalization of lease information. The usage of operating leases increased, significantly from the first study to the 1991 study, and this trend continues. The incidence of leasing, the classification of leases as operating, and the percentage of operating leases to total fleet have all increased for the majority of the airlines reviewed. When operating lease data were capitalized, debt ratios weakened, providing further evidence of deterioration in the financial health of air carriers.

  15. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  16. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  17. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  18. Competition and performance in OCS oil and gas lease sales and lease development, 1954-1969

    Science.gov (United States)

    Mead, Walter J.; Sorensen, Philip Edward

    1980-01-01

    The oil and gas resources of the Outer Continental Shelf represent one of America's largest publicly-owned assets. Through 1978, OCS oil and gas leases had yielded \\$40.5 billion in gross production value and produced over \\$28.3 billion in direct revenue to the federal government.Policies and procedures for managing the oil and gas resources of the OCS were established by Congress in the Outer Continental Shelf Lands Act of 1953. The Department of Interior was given the central responsibility for carrying out this management role in the 1953 Act; this responsibility has been re-established in the 1978 Amendments to the OCS Lands Act. As stated in the 1978 legislation, the goals of OCS management are to:...preserve, protect and develop oil and natural gas resources in a manner which is consistent with the need (A) to make such resources available to meet the Nation's energy needs as rapidly as possible... (C) to insure the public a fair and equitable return on the resources of the Outer Continental Shelf, and (D) to preserve and maintain free enterprise competition.As part of its continuing effort to monitor the effectiveness of federal policies relating to OCS oil and gas resources, the Conservation Division of U.S. Geological Survey, Department of Interior, has sponsored the research which is the basis for the present report. The objectives of the research have been to determine the extent to which the historical policies of OCS management have resulted in achievement of the goals set forth by Congress in the section quoted above.

  19. Convergence of IFRS and US GAAP in the field of lease: the impact of new methodological approaches for operating lease reporting

    Directory of Open Access Journals (Sweden)

    Patrik Svoboda

    2012-01-01

    Full Text Available Since 2002 the International Accounting Standards Board (IASB and the Financial Accounting Standards Board (FASB has begun significantly cooperate in the creation of standards based on the same principals. This is a process of convergence. It is realized through a series of sub-projects aimed at short-term or long-term period. Revenue recognition and lease reporting projects represent priority areas of convergence. The issue of leases belongs to one of the areas in which there have been, after a relatively long time, criticized the very principles applied in international accounting standards. The result of the convergence activities should be the creation of such methodological approaches of reporting the lease contracts on the side of lessee and then lessor that would eliminate the main weaknesses of the current system of reporting based on the classification of lease contracts in connection with the execution or non execution of the transfer of risks and benefits associated with the lease to the lessee. The aim of this paper is to evaluate the impact of implementation of the newly proposed methodological approach for lease reporting in the field of operating leases into the financial statements that will be affected by this change of methodology (balance sheet, income statement. Subsequently, it is evaluated also the impact into selected indicators of financial analysis with a focus on indicators, in whose construction are used items of statements that are significantly affected by the change of the methodological approach.

  20. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  1. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  2. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  3. Software Verification and Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    International Nuclear Information System (INIS)

    YEH, T.

    2002-01-01

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent

  4. Nuclear Fuel Leasing, Recycling and proliferation: Modeling a Global View

    International Nuclear Information System (INIS)

    Crozat, M P; Choi, J; Reis, V H; Hill, R

    2004-01-01

    On February 11, 2004, U.S. President George W. Bush, in a speech to the National Defense University stated: ''The world must create a safe, orderly system to field civilian nuclear plants without adding to the danger of weapons proliferation. The world's leading nuclear exporters should ensure that states have reliable access at reasonable cost to fuel for civilian reactors, so long as those states renounce enrichment and reprocessing. Enrichment and reprocessing are not necessary for nations seeking to harness nuclear energy for peaceful purposes.'' This concept would require nations to choose one of two paths for civilian nuclear development: those that only have reactors and those that contain one or more elements of the nuclear fuel cycle, including recycling. ''Fuel cycle'' states would enrich uranium, manufacture and lease fuel to ''reactor'' states and receive the reactor states' spent fuel. All parties would accede to stringent security and safeguard standards, embedded within a newly invigorated international regime. Reactor states would be relieved of the financial, environmental (and political) burden of enriching and manufacturing fuel and dealing with spent fuel. Fuel cycle states would potentially earn money on leasing the fuel and perhaps on sales of reactors to the reactor states. Such a leasing concept is especially interesting in scenarios which envision growth in nuclear power, and an important consideration for such a nuclear growth regime is the role of recycling of civilian spent fuel. Recycling holds promise for improved management of spent fuel and efficient utilization of resources, but continues to raise the specter of a world with uncontrolled nuclear weapons proliferation. If done effectively, a fuel-leasing concept could help create a political and economic foundation for significant growth of clean, carbon-free nuclear power while providing a mechanism for significant international cooperation to reduce proliferation concern. This

  5. 36 CFR 228.104 - Consideration of requests to modify, waive, or grant exceptions to lease stipulations.

    Science.gov (United States)

    2010-07-01

    ... Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS Oil and Gas Resources Leasing § 228... led the Forest Service to require the inclusion of the stipulation in the lease can be met without...

  6. THE USE EFFICIENCY OF FINANCIAL LEASING FOR THE RENEWAL OF FIXED CAPITAL OF THE RAILWAY INDUSTRY ENTERPRISES

    Directory of Open Access Journals (Sweden)

    V. I. Strilets

    2009-12-01

    Full Text Available In the article the dynamics of development and global structure of the leasing market are analyzed, the advantages of using the financial leasing for upgrading the fixed capital of railway industry are formulated.

  7. 77 FR 14832 - Plumchoice, Inc., Including On-Site Leased Workers From Balance Staffing, Insight Global Staffing...

    Science.gov (United States)

    2012-03-13

    ...., Including On-Site Leased Workers From Balance Staffing, Insight Global Staffing, and Technisource..., Insight Global Staffing, and Technisource, Scarborough, Maine. The workers are engaged in activities... leased workers from Balance Staffing, Insight Global Staffing, and Technisource, Scarborough, Maine, who...

  8. New Hampshire Better Buildings - Final Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Cramton, Karen [NH Office of Energy and Planning; Peters, Katherine

    2014-02-20

    With $10 million in funding from the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program, the NH Better Buildings program was established as an initiative that initially empowered the three “Beacon Communities” of Berlin, Nashua and Plymouth to achieve transformative energy savings and reductions in fossil fuel use and greenhouse gases through deep energy retrofits and complementary sustainable energy solutions. The program also enabled those Communities to provide leadership to other communities around the state as “beacons” of energy efficiency. The goal of the program was to reduce energy use by a minimum of 15% through energy efficiency upgrades in residential and commercial buildings in the communities. The program expanded statewide in April 2012 by issuing a competitive solicitation for additional commercial projects non-profit, and municipal energy efficiency projects from any community in the state, and a partnership with the state’s utility-run, ratepayer-funded residential Home Performance with ENERGY STAR® (HPwES) program. The NH Better Buildings program was administered by the New Hampshire Office of Energy and Planning (OEP) and managed by the NH Community Development Finance Authority (CDFA). The program started in July 2010 and the last projects funded with American Reinvestment and Recovery Act (ARRA) funds were completed in August 2013. The program will continue after the American Recovery and Reinvestment Act program period as a Revolving Loan Fund, enabling low-interest financing for deep energy retrofits into the future.

  9. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  10. Finanční leasing z pohledu nájemce dle české legislativy a IFRS

    OpenAIRE

    Ťápalová, Hana

    2008-01-01

    The main goal of this bachelor's thesis is to create a comprehensive view of the problematics of the financial leasing from the leaseholder's point of view. The first part is focused on theoretical background of the financial leasing regulated by Czech legislation. It also describes financial leasing in light of accounting (evaluation and evidence, reporting leasing or advance payment) and taxes (corporation income tax, VAT and other ones). The second part is focused on International Financia...

  11. How to electrify more of the public to lease electric vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Huestis, E.P. [City of Vacaville, CA (United States)

    2000-07-01

    The City of Vacaville, in Northern California, aims to become the city which boast the highest number of electric vehicles per capita (residential) in both California and the United States. To that effect, it secured a $300,000 grant from the Congestion Mitigation and Air Quality Improvement Program in order to provide an incentive of $6,000 to 35 customers over the life of the three-year lease of a qualifying electric vehicle. Additional electric charging infrastructure throughout the Vacaville and the replacement of some aging City fleet vehicles with electric vehicles will be possible using the remainder of the grant money. The incentive program proved so popular, through word of mouth and positive press coverage, that 75 customers expressed an interest in the program. Several of the customers had just taken delivery of an electric vehicle from General Motors or Ford. Unable to provide the same incentive to all customers from the original grant, the City of Vacaville applied for a $600,000 additional grant from the Congestion Mitigation and Air Quality to serve 50 more customers, as well as for the provision of additional charging stations at strategic locations. The expansion of the program has received preliminary approval for its second grant application.

  12. 76 FR 19466 - Masco Builder Cabinet Group Including On-Site Leased Workers From Reserves Network, Reliable...

    Science.gov (United States)

    2011-04-07

    ... Builder Cabinet Group Including On-Site Leased Workers From Reserves Network, Reliable Staffing, and Third Dimension Waverly, OH; Masco Builder Cabinet Group Including On-Site Leased Workers From Reserves Network... Group including on-site leased workers from Reserves Network, Jackson, Ohio. The workers produce...

  13. 75 FR 20390 - Robert Bosch LLC, Including On-Site Leased Workers From Bosch Management Services North America...

    Science.gov (United States)

    2010-04-19

    ...-site leased workers of Bosch Management Services North America, South Haven Community Hospital... leased workers of Bosch Management Services North America, South Haven Community Hospital, Huffmaster Inc..., Including On-Site Leased Workers From Bosch Management Services North America, South Haven Community...

  14. 75 FR 55613 - Dupont Teijin Films Including On-Site Leased Workers From Schenkers Logistics, Inc., Florence, SC...

    Science.gov (United States)

    2010-09-13

    ... Including On-Site Leased Workers From Schenkers Logistics, Inc., Florence, SC; Amended Certification... Teijin Films, including on-site leased workers from Schenkers Logistics, Inc., Florence, South Carolina... leased workers of Schenkers Logistics, Inc., Florence, South Carolina, who became totally or partially...

  15. 41 CFR 102-73.170 - What types of special purpose space may the Department of Agriculture lease?

    Science.gov (United States)

    2010-07-01

    ... purpose space may the Department of Agriculture lease? 102-73.170 Section 102-73.170 Public Contracts and... § 102-73.170 What types of special purpose space may the Department of Agriculture lease? The Department of Agriculture is delegated the authority to lease the following types of special purpose space: (a...

  16. 41 CFR 102-72.30 - What are the different types of delegations related to real estate leasing?

    Science.gov (United States)

    2010-07-01

    ... types of delegations related to real estate leasing? 102-72.30 Section 102-72.30 Public Contracts and... REGULATION REAL PROPERTY 72-DELEGATION OF AUTHORITY Delegation of Authority § 102-72.30 What are the different types of delegations related to real estate leasing? Delegations related to real estate leasing...

  17. 76 FR 18778 - Notice of Proposed Reinstatement of Terminated Oil and Gas Leases MTM 89460, MTM 89461, MTM 89467...

    Science.gov (United States)

    2011-04-05

    ... that affect these lands. The lessee agrees to new lease terms for rentals and royalties of $10 per acre and 16\\2/3\\ percent. The lessee paid the $500 administration fee for the reinstatement of each lease... leases; The increased rental of $10 per acre; The increased royalty of 16\\2/3\\ percent; and The $163 cost...

  18. 75 FR 66795 - TTM Technologies, Including On-Site Leased Workers From Kelly Services, Aerotek, and an On-Site...

    Science.gov (United States)

    2010-10-29

    ... follows: ``All workers TTM Technologies, including on-site leased workers from Kelly Services and Aerotek... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-64,993] TTM Technologies, Including On-Site Leased Workers From Kelly Services, Aerotek, and an On-Site Leased Worker From Orbotech...

  19. 77 FR 21588 - Hart and Cooley, Inc., A Subsidiary of Tomkins, PLC Including On-Site Leased Workers from...

    Science.gov (United States)

    2012-04-10

    ... Subsidiary of Tomkins, PLC Including On- Site Leased Workers from Reliable, Masiello Employment Services..., applicable to workers of Hart and Cooley, Inc., a subsidiary of Tomkins, PLC, including on-site leased... workers. Based on these findings, the Department is amending this certification to include workers leased...

  20. 78 FR 8190 - Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore North Carolina...

    Science.gov (United States)

    2013-02-05

    ...] Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore North Carolina--Call for... Commercial Leasing for Wind Power Offshore North Carolina (Call), published on December 13, 2012 (77 FR 7204). DATES: BOEM must receive your nomination describing your interest in obtaining a commercial wind lease...