WorldWideScience

Sample records for kv power systems

  1. FPGA based control system for -100 kV, 25 A Crowbarless DC power supply

    International Nuclear Information System (INIS)

    Upadhyay, R.; Tripathi, A.; Badapanda, M.K.; Lad, M.

    2015-01-01

    FPGA based digital control system has been developed for -100 kV, 25 A solid state modular crowbarless DC klystron bias power supply of 1 MW, 352.2 MHz RF test stand. The control system has capability to operate this power supply either in CW or pulse mode. Central controller, PSM controller and graphical user interface are key parts of this control system. Central controller monitors the status of various subsystems of this power supply like 11 kV step start unit, four numbers of main transformers each having 44 numbers of secondary windings and 176 numbers of switch power modules for deciding the number of power modules to be put ON and their duty cycles depending on the set output voltage and current. PSM controller sends appropriate control signal to the switch power modules through fibre optic lines and communicates it to the central controller. Linux based graphical user interface has been developed which enables the user to set the operating parameters along with their trip limits and displays the information of critical parameters of this power supply on a local touch screen panel. Provision for remote control and supervision is also provided through a separate PC connected to the main control system via Ethernet. The control system has capability to trip the power supply within 5 μsec in case any parameter exceeds its set limit. Suitable data logging feature is incorporated for offline fault analysis. The control system architecture along with its software protection interlocks are presented in this paper. The performance of the control system has been verified during operation of -100 kV, 25 A DC power supply with 1 MW, 352.2 MHz klystron amplifier. (author)

  2. Diagnostics system for the 67 MJ, 50 kV pulsed power capacitor bank

    Energy Technology Data Exchange (ETDEWEB)

    Galakhov, I V; Gasheev, A S; Gruzin, I A; Gudov, S N; Murugov, V M; Osin, V A; Pankratov, V I; Pegoev, I N [All-Russian Scientific Research Inst. of Experimental Physics, Sarov (Russian Federation)

    1997-12-31

    The diagnostics system is designed for charging and discharging to the load of the large 67 MJ and 50 kV capacitor bank for the iodine laser pulse power of ISKRA-5 facility. Discharging diagnostics of the capacitor bank uses a technique to measure a sequence of times between representative discharge events for 665 discharge circuits of the bank. Benefits of the measurement techniques are discussed. (author). 3 figs., 3 refs.

  3. Diagnostics system for the 67 MJ, 50 kV pulsed power capacitor bank

    International Nuclear Information System (INIS)

    Galakhov, I.V.; Gasheev, A.S.; Gruzin, I.A.; Gudov, S.N.; Murugov, V.M.; Osin, V.A.; Pankratov, V.I.; Pegoev, I.N.

    1996-01-01

    The diagnostics system is designed for charging and discharging to the load of the large 67 MJ and 50 kV capacitor bank for the iodine laser pulse power of ISKRA-5 facility. Discharging diagnostics of the capacitor bank uses a technique to measure a sequence of times between representative discharge events for 665 discharge circuits of the bank. Benefits of the measurement techniques are discussed. (author). 3 figs., 3 refs

  4. Performance of the 10-kV, 5-MA pulsed-power system for the FRX-C compression experiment

    International Nuclear Information System (INIS)

    Rej, D.J.; Waganaar, W.J.

    1991-01-01

    Performance data are presented for the 10-kV, 5-MA, 1.5-MJ pulsed-power system developed for the Los Alamos magnetic fusion facility FRX-C. This system energizes a low-inductance magnet for the high-power, compression heating of compact toroid plasmas. An ignitron-switched, 20-mF, 10-kV, 4-MA capacitor bank is discharged to produce the main compression field, while an inductively-isolated, 10-mF, 10-kV, 1-MA bank generates an initial magnetic field to accept the translated plasma. To date, the complete system has successfully operated for two years and approximately 2000 high-power discharges. Component performance during typical and fault-mode operation is reviewed. 5 refs., 5 figs

  5. Long-pulse neutral beam power supply system for LBL 20 kV, 10 A sources

    International Nuclear Information System (INIS)

    Honey, V.J.; Baker, W.R.; Fitzgerald, M.L.

    1976-05-01

    A description is given of the power supplies and control system for the LBL 20 kV, 10 A, 10 sec long-pulse neutral beam source test facility, now in operation. Such sources are used in a number of existing and planned fusion power experiments

  6. Novel adaptive distance relay algorithm considering the operation of 154 kV SFCL in Korean power transmission system

    International Nuclear Information System (INIS)

    Lee, S.; Lee, J.; Song, S.; Yoon, J.; Lee, B.

    2015-01-01

    Highlights: • This paper presents an outline of the new project of the 154 kV SFCL in Korea. • And then we review some protection problems for the application of 154 kV SFCLs. • This paper proposes a new adaptive protection algorithm for 154 kV SFCLs. • The developed algorithm is tested in a simple distance relay system. - Abstract: In general, SFCLs can have a negative impact on the protective coordination in power transmission system because of the variable impedance of SFCLs. It is very important to solve the protection problems of the power system for the successful application of SFCLs to real power transmission system. This paper reviews some protection problems which can be caused by the application of 154 kV SFCLs to power transmission systems in South Korea. And then we propose an adaptive protection algorithm to solve the problems. The adaptive protection algorithm uses the real time information of the SFCL system operation.

  7. Power cables with extruded insulation and their accessories for rated voltages from 1 kV (Um = 1,2 kV) up to 30 kV (Um = 36 kV) : Part 2: cables for rated voltages from 6 kV (Um = 7,2 kV) up to 30 kV (Um = 36 kV)

    CERN Document Server

    International Electrotechnical Commission. Geneva

    2005-01-01

    Power cables with extruded insulation and their accessories for rated voltages from 1 kV (Um = 1,2 kV) up to 30 kV (Um = 36 kV) : Part 2: cables for rated voltages from 6 kV (Um = 7,2 kV) up to 30 kV (Um = 36 kV)

  8. Long-term test of the 22.9kV HTS power cable system in LS Cable Ltd

    International Nuclear Information System (INIS)

    Jang, Hyun Man; Lee, Chang Young; Kim, Choon Dong; Kim, Do Hyung; Park, In Son; Ji, Bong Ki; Kim, Dong Wook; Cho, Jeonwook

    2006-01-01

    Since 2001, LS cable Ltd. has been developing the design, manufacturing and evaluation technologies for high temperature superconducting (HTS) power cable system as a member of DAPAS (Dream for Advanced Power system by Applied Superconductivity technology) program in Korea. The 30 m HTS cable system that is rated at 22.9 kV and 1.2 kA giving a rated capacity of 50 MVA had been developed and tested. The cable was designed as a cold dielectric type employing Bi-2223 HTS tapes and polypropylene (PP) laminated paper as the conductor and electrical insulation, respectively. The cable is cooled with sub-cooled liquid nitrogen at temperature from 75 to 77 K. The manufacturing and the installation of the cable system were completed in 2004. Long-term performance test of the cable system has been conducted for six months to verify its electric and mechanical properties in 2005

  9. Development of a 400 kV 80 mA Cockcroft-Walton power supply and 12 kW isolation transformer systems for neutron generators

    Science.gov (United States)

    Lu, X.; Chen, S.; Zhang, Y.; Huang, Z.; Ma, Z.; Yao, Z.

    2017-06-01

    A 400 kV 80 mA Cockcroft-Walton power supply driven by 2.5 kHz frequency, and 12 kW isolation transformer systems are developed for an intense DD/DT neutron generator. The design, construction, and testing of the high voltage (HV) power supply and isolation transformer systems are detailed reported. The structure of step-up transformers can make the potential distribution uniform, and auxiliary coils of the isolation transformers can improve the power transmission efficiency significantly. The testing results show that the HV power supply can reach 400 kV, and the isolation transformer systems can withstand 400 kV voltages and its power transmission efficiency is about 98.1%.

  10. On geomagnetically-induced currents in the Finnish 400 kV power system by an auroral electrojet current

    International Nuclear Information System (INIS)

    Pirjola, R.; Viljanen, A.

    1989-01-01

    The auroral electrojet current flowing in the ionosphere is modeled by a horizontal east-west line current of infinite length. The earth is described by a simple two-layer model. An expression for the earth-surface electric field, which is thus connected with a geomagnetic disturbance in and near the auroral zone, is given. This electric field is considered as external from the viewpoint of the Finnish 400 kV power system, and the resulting geomagnetically-induced currents (GICs) in the system are computed. In the north, i.e. near the electrojet, GICs may have values even in the order of hundreds of amperes. A comparison to GICs produced by an equivalent spatially-constant external electric field is demonstrated. Sometimes the location of the electrojet is further south. This possibility is studied by letting the line current have several different locations above the Finnish power grid

  11. Measurements of crowbar performance of the 20 kV 130 A dc power supply of the TRIUMF RF system

    International Nuclear Information System (INIS)

    Mitra, A.K.

    1991-05-01

    The TRIUMF RF system operates at a fixed frequency of 23.06 MHz with a power capability of 1800 kW. The dc plate power for the four push-pull power amplifiers is provided by a single dc power supply at 20 kV, 130 A and the amplifiers are protected by a single ignitron crowbar circuit. In the case of voltage breakdown outside the tube, the triggering of the crowbar circuit relies on the voltage developed across a low resistance shunt in the return path of the common dc power supply. Frequent failure of the crowbar ignitrons following an external dc voltage breakdown led to the investigation of the crowbar performance. Current transformers have been installed in the common B + line to the power amplifiers and the anode circuit of the ignitron crowbar in order to measure amplitude, duration and time delay of various dc currents under fault conditions. Similar current transformers were installed in the individual anode circuits of the power amplifiers to provide protection to the complete system in case of an external dc voltage breakdown. The results of these measurements and recommended solutions for operations are reported. (Author) 3 refs., 4 figs

  12. Research on data integration of Anshan 10 kV power distribution network system

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, T.; Dang, N.; Liu, Y. [North China Electric Power Univ., Beijing (China); Wang, Z. [Anshan Electric Co. Ltd., Anshan City (China)

    2009-03-11

    Variations in data formats among electric power supervisory control systems are preventing the development of an integrated power distribution database. The use of standard XML protocols make web-based services platform and language independent, as they are based on open standards that allow software to communicate in a standardizing XML messaging system. This article discussed the use of web-based services as a safe interface for accessing distribution system databases. Web services technology was used to pass through the firewall of individual data servers while avoiding direct contact with the actual database and ensuring the security of the data server. A virtual machine technology was then applied in a testing environment to demonstrate the method. The test results confirmed that the method can be used to integrate data from various power systems. 8 refs., 5 figs.

  13. Circuit protection of ehv power systems from 150 to 765 kV

    Energy Technology Data Exchange (ETDEWEB)

    Geise, F; Jaeger, J

    1965-11-01

    Short tripping times required for all faults in ehv transmission systems are obtained by means of differential and comparative protection arrangements. It is essential that protection and communication systems be closely integrated and that special current transformers with linearized cores supply protective devices with correct measured values. By arranging filters between transformer and directional relay, it is possible to use capacitive voltage transformers for high speed protection. A description of power system with backup protection devices is presented.

  14. Fault protection system in a 'regulated high voltage power supply (80 KV, 130A)' for neutral beam injector

    International Nuclear Information System (INIS)

    Patel, Paresh; Sumod, C.B.; Thakkar, Dipal

    2011-01-01

    Regulated High Voltage Power Supply (RHVPS) system has been developed at Institute for Plasma Research (IPR) for use with the Neutral Beam and RF applications. The highest ratings manufactured so far is 80 kV, 130 A. The system is developed in house and also being delivered at different research institutes for various applications. Since it is a multi megawatt output power system, and the loads have very low fault energy tolerant, fault protection system is mandatory. Protections are mandatory at each stage of conversion. Output fault protection is done in a variety of ways. Fast turn off at output is achieved and test results are discussed. Multi secondary transformers (5.6 MVA rating, with 40 outputs) are used in realising the power supply. These special transformers need protection even for over current at one secondary when the output fault current is not reflected to primaries to break the main circuit breaker. It becomes difficult to bifurcate fault in such situations. Special technique is applied to sense it. Electronic means are used for fast detection and tripping the system. This paper describes the basic RHVPS topology and test results along with presentation on the input and output fault protection systems. (author)

  15. Operational experience with -20 kV, 5 A DC power supply in Indus-2 RF system

    International Nuclear Information System (INIS)

    Tyagi, R.K.; Tripathi, A.; Upadhyay, R.; Badapanda, M.K.; Lad, M.

    2015-01-01

    An AC regulator based -20 kV, 5 A DC power supply is employed to bias 60 kW, 505.8 MHz klystron amplifier in Indus-2 RF system. A three terminal triggered spark gap based crowbar along with suitable limiting elements is incorporated at the output of the power supply for protection of sensitive klystron amplifier during load arcing conditions. Wire burn test is carried out on this power supply along with crowbar to ensure that the stored energy dumped into klystron during its arcing is less than 20 Joule. Various protection circuits like over voltage, over current, under voltage, phase failure, thermal overload and transformer oil over temperature protection have been incorporated in this power supply. Preventive maintenance of the power supply is carried out at regular intervals to ensure that it operates satisfactorily during actual operation.This includes checking the breakdown strength of transformer oil, drying of Silica gels in transformer breathers, checking of all electrical connections and cleaning of all high voltage components. The calibration of various meters, checking the setting of various protection-interlock cards and checking the healthiness of crowbar system are also done at regular intervals. During operation, crucial performance parameters of this power supply along with various interlock signals are continuously monitored. Suitable arrangement has been made to operate this supply either in local mode as well as in remote mode. This power supply is operating satisfactorily with klystron amplifier in Indus-2 RF system in round the clock mode for last 15 years and its operational experience are presented in this paper. (author)

  16. Management of high current transients in the CWDD Injector 200 kV power system

    International Nuclear Information System (INIS)

    Carwardine, J.A.; Pile, G.; Zinneman, T.E.

    1993-01-01

    The injector for the Continuous Wave Deuterium Demonstrator is designed to deliver a high current CW negative deuterium ion beam at an energy of 200 keV to a Radio Frequency Quadrupole. The injector comprises a volume ion source, triode accelerator, high-power electron traps and low-energy beam transport with a single focusing solenoid. Some 75 Joules of energy are stored in stray capacitance around the high voltage system and discharged in a few microseconds following an injector breakdown. In order to limit damage to the accelerator grids, a magnetic snubber is incorporated to absorb most of the energy. Nevertheless, large current transients flow around the system as a result of an injector breakdown; these have frequently damaged power components and caused spurious behavior in many of the supporting systems. The analytical and practical approaches taken to minimize the effects of these transients are described. Injector breakdowns were simulated using an air spark gap and measurements made using standard EMC test techniques. The power circuit was modeled using an electrical simulation code; good agreement was reached between the model and measured results

  17. Power System Reliability Assessment by Analysing Voltage Dips on the Blue Horizon Bay 22KV Overhead Line in the Nelson Mandela Bay Municipality

    Science.gov (United States)

    Lamour, B. G.; Harris, R. T.; Roberts, A. G.

    2010-06-01

    Power system reliability problems are very difficult to solve because the power systems are complex and geographically widely distributed and influenced by numerous unexpected events. It is therefore imperative to employ the most efficient optimization methods in solving the problems relating to reliability of the power system. This paper presents a reliability analysis and study of the power interruptions resulting from severe power outages in the Nelson Mandela Bay Municipality (NMBM), South Africa and includes an overview of the important factors influencing reliability, and methods to improve the reliability. The Blue Horizon Bay 22 kV overhead line, supplying a 6.6 kV residential sector has been selected. It has been established that 70% of the outages, recorded at the source, originate on this feeder.

  18. THE COMPARATIVE ANALYSIS OF ECONOMIC DISPATCH AND OPTIMAL POWER FLOW METHODS FOR 22-BUS 380-kV POWER SYSTEM IN TURKEY

    Directory of Open Access Journals (Sweden)

    Mehmet KURBAN

    2007-03-01

    Full Text Available In this paper, the economic dispatch and optimal power flow (OPF methods for the purpose of supplying the load demand with minimum cost is used for 22-bus 380-kV power system in Turkey which consists of 8 thermal plants operated by EUAS (Electricity Generation Co. Inc.and the results found are analyzed comparatively. The results of analysis are given in tables and figures. The analysis made is implemented by the software using MATLAB®. Furthermore, the software can be used for different power systems by using the graphical user interface (GUI. All data used in this study is taken from TEIAS (Transmission System Operator of Turkey and EUAS.

  19. Design and performance of the 10-kV, 5-MA pulsed-power system for the FRX-C compression experiment

    International Nuclear Information System (INIS)

    Rej, D.J.; Barnes, G.A.; Gribble, R.J.; Hinckley, J.E.; Kreider, T.W.; Waganaar, W.J.

    1989-05-01

    The design and performance of the pulsed-power system for the FRX-C compact toroid compression heating experiment are reviewed. Two inductively-isolated, 10-kV capacitor banks (total energy = 1.5 MJ) are discharged through a common, low-inductance load. The 5-MA currents are switched and crowbarred with parallel arrays of size-D ignitrons. Power supplies are constructed in simple 25 and 50 kJ modules, each capable of supplying 100 kA at 10 kV. Non-negligible source inductance and the addition of high-power resistors maintain module isolation and protect the system during fault modes. 21 refs., 31 figs

  20. Development of 66 kV/6.9 kV 2 MV A prototype HTS power transformer

    International Nuclear Information System (INIS)

    Bohno, T.; Tomioka, A.; Imaizumi, M.; Sanuki, Y.; Yamamoto, T.; Yasukawa, Y.; Ono, H.; Yagi, Y.; Iwadate, K.

    2005-01-01

    We have developed the technology of the producing a HTS magnet for the power transformer. Three subjects have been mainly studied, high voltage technologies, large current and low AC loss technologies and sub-cooling system technologies to establish the technology of 66 kV/6.9 kV 10 MV A class HTS power transformer. In order to verify the validity of elemental technologies, such as high voltage technologies, large current and low AC loss technologies and sub-cooling system technologies, single-phase 2 MV A class 66 kV/6.9 kV prototype HTS transformer was manufactured and tested. In the load loss (AC loss) measurement, it was obtained that the measured value of 633 W was almost corresponding to the calculated value of 576 W at the rated operation of 2 MV A. Moreover, the breakdown was not found all voltage withstand test. These test results indicate that elemental technologies were established for the development of 66 kV/6.9 kV 10 MV A class HTS power transformer

  1. The influence of the 220 kv and 66 kv power electric systems and the subsystem of their servitude range in the 'chaco central' ecosystem in Paraguay; Relacion de tendido electrico de 220 kV y 66kV en el ecosistema del chaco central del Paraguay y el subsistema de su franja de servidumbre

    Energy Technology Data Exchange (ETDEWEB)

    Acosta E, Hugo Cesar [ANDE - Administracion Nacional de Electricidad, Assuncion (Paraguay)

    2001-07-01

    According to the report from DOP/EL, in a medium period of time it has been registered nine disconnections of the 66 kv power transmission line located in the Chaco zone occurred in the nocturnal period. Those disconnections affected negatively the milky processes of Colinas Menonitas, deteriorating more than 20,000 liters of milk for each cut of the electric energy service. DMA/IM has accomplished a investigation job together with DOM/FO and has found the main reasons for those disconnections, so based on them it has recommended possible solutions related to the problem.

  2. MFTF 230 kV pulsed power substation

    International Nuclear Information System (INIS)

    Wilson, J.H.

    1979-01-01

    The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design

  3. Compact 250-kV injector system for PIGMI

    International Nuclear Information System (INIS)

    Hamm, R.W.; Stevens, R.R. Jr.; Mueller, D.W.; Lederer, H.M.

    1978-01-01

    A 250-kV proton injector to be used in the development of a linac suitable for medical applications has been constructed. This injector utilizes a spherical Pierce geometry to produce a converging beam. A gas insulated accelerating column is cantilevered on a grounded vacuum system, with a separate high voltage equipment dome connected to a 300-kV Cockcroft-Walton power supply. The injector can be operated locally or remotely, with the remote control accomplished by a microprocessor system linked to a central control minicomputer. This injector has been designed as a low-cost compact system. The design details and the data obtained during initial operation are presented

  4. Integration of -70kV, 22A high voltage power supply with solid state crowbar and the LHCD system of SST-1

    International Nuclear Information System (INIS)

    Rajan Babu, N.; Virani, C.G.; Dalakoti, S.; Sharma, P.K.; Ambulkar, K.K.; Parmar, P.R.; Thakur, A.L.; Dhorajiya, Pragnesh

    2015-01-01

    LHCD system is a important system for the steady state operation of the SST-1 machine. Four numbers of klystrons of 3.7 GHz are used as a microwave source to produce 2 MW of microwave power. This power is launched into the machine to achieve the steady state operation of the SST-1 Machine. A -70kV, 22A high voltage power supply and a solid-state crowbar are procured and tested and validated for its performance separately. Both of the system are integrated and tested for its integrated performance for the safe and reliable test of the klystron tube. A 10J wire test is conducted for the optimum value of the series resistor. This test will validate the integrated performance of power supply, Crowbar and the interlocking circuit. This paper details the optimization of the ballast resistor from 150 ohms to 40 ohms and its successful integration with the klystron tube for its 500kW CW operation. Some operational experience is also shared

  5. Software for optimal selection of places for installation of balancing devices in 0,4 kV electric power systems loaded with electric motors

    Directory of Open Access Journals (Sweden)

    Romanova Victoria

    2017-01-01

    Full Text Available This publication considers the issues of development of the software program for designing of 0,4 kV power supply systems with motor-actuated load under voltage unsymmetry conditions (using the example of the Trans-Baikal Territory. Voltage unsymmetry is practically constant phenomenon in the electric power networks of different voltage types. Voltage unsymmetry effects significantly the electric power consumers, including the supply mains itself. It has especially negative impact on the electrical equipment operation process and its lifetime. The urgency of the problem is confirmed by multiple research on the same topic and by significant number of damages suffered by the electric power consumers staying in service (especially in the Trans-Baikal Territory and in the Far-East regions. Voltage unsymmetry causes economic loss and reduction of the electromagnetic interference value by the voltage unsymmetry coefficient in negative-phase sequence (K2U gives inevitable economic effect accordingly. However, the payback period for the activities aimed at reduction of electromagnetic interference, will vary from some months to several years. The more accurate value of the payback period may be obtained using the developed software program. The developed software design program is implemented by means of the programming language C# in Microsoft Visual Studio environment, using the built-in cross-platform database SQLite. The software program shall allow making quick and accurate calculation of the power losses, to determine the economic feasibility of provision special measures for removal of the voltage unsymmetry, for determination of optimal application and location of the balancing devices. The software implementation in power systems loaded with electric motors will improve reliability and efficiency of asynchronous motors. The software is of interest for developers of projects on power supply systems for regions with non-linear loads.

  6. Study on Oscillations during Short Circuit of MW-Scale IGBT Power Modules by Means of a 6-kA/1.1-kV Nondestructive Testing System

    DEFF Research Database (Denmark)

    Wu, Rui; Diaz Reigosa, Paula; Iannuzzo, Francesco

    2015-01-01

    This paper uses a 6-kA/1.1-kV nondestructive testing system for the analysis of the short-circuit behavior of insulated-gate bipolar transistor (IGBT) power modules. A field-programmable gate array enables the definition of control signals to an accuracy of 10 ns. Multiple 1.7-kV/1-kA IGBT power...... modules displayed severe divergent oscillations, which were subsequently characterized. Experimental tests indicate that nonnegligible circuit stray inductance plays an important role in the divergent oscillations. In addition, the temperature dependence of the transconductance is proposed as an important...

  7. Performance of the TJ-II ECRH system with the new -80 kV 50 A high voltage power supply

    International Nuclear Information System (INIS)

    Fernandez, A.; de la Fuente, J.M.; Ganuza, D.; Kirpitchev, I.; Alonso, J.; Garcia, F.; Ascasibar, E.; del Rio, J.M.; Garcia, I.; Ros, A.; Alvarez, P.; Tolkachev, A.; Catalan, G.

    2009-01-01

    The ECRH system of the TJ-II stellarator consists of two triode - 53.2 GHz - gyrotrons, which can deliver a maximum power of 300 kW each, during 1 s. Both gyrotrons are fed by a common high voltage power supply (HVPS). During the last experimental campaigns the performance of the gyrotrons were limited by the HVPS, whose maximum output current was limited to 30 A and the ripple level of the output voltage was around 7%. In order to guarantee the reliability of the ECRH system and to improve its performance, a new HVPS has been developed and manufactured by the company JEMA and was commissioned at CIEMAT during 2007. The design is based on solid-state technology and high frequency commutation techniques. The new unit reaches -80 kV and 50 A during a maximum pulse length of 1 s. The complete design, testing and commissioning of the HVPS are presented, as well as the routine operation of the ECRH system during the TJ-II experimental campaign.

  8. Performance of the TJ-II ECRH system with the new -80 kV 50 A high voltage power supply

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, A. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT Association, Avda. Complutense 22, 28040 Madrid (Spain)], E-mail: angela.curto@ciemat.es; de la Fuente, J.M.; Ganuza, D. [Grupo JEMA, Paseo del Circuito 10, 20160 Lasarte-Oria (Spain); Kirpitchev, I.; Alonso, J. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT Association, Avda. Complutense 22, 28040 Madrid (Spain); Garcia, F. [Grupo JEMA, Paseo del Circuito 10, 20160 Lasarte-Oria (Spain); Ascasibar, E. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT Association, Avda. Complutense 22, 28040 Madrid (Spain); del Rio, J.M.; Garcia, I. [Grupo JEMA, Paseo del Circuito 10, 20160 Lasarte-Oria (Spain); Ros, A.; Alvarez, P.; Tolkachev, A.; Catalan, G. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT Association, Avda. Complutense 22, 28040 Madrid (Spain)

    2009-06-15

    The ECRH system of the TJ-II stellarator consists of two triode - 53.2 GHz - gyrotrons, which can deliver a maximum power of 300 kW each, during 1 s. Both gyrotrons are fed by a common high voltage power supply (HVPS). During the last experimental campaigns the performance of the gyrotrons were limited by the HVPS, whose maximum output current was limited to 30 A and the ripple level of the output voltage was around 7%. In order to guarantee the reliability of the ECRH system and to improve its performance, a new HVPS has been developed and manufactured by the company JEMA and was commissioned at CIEMAT during 2007. The design is based on solid-state technology and high frequency commutation techniques. The new unit reaches -80 kV and 50 A during a maximum pulse length of 1 s. The complete design, testing and commissioning of the HVPS are presented, as well as the routine operation of the ECRH system during the TJ-II experimental campaign.

  9. Conducted noise analysis and protection of 45 kJ/s, ±50 kV capacitor charging power supply when interfaced with repetitive Marx based pulse power system

    Science.gov (United States)

    Naresh, P.; Patel, Ankur; Sharma, Archana

    2015-09-01

    Pulse power systems with highly dynamic loads like klystron, backward wave oscillator (BWO), and magnetron generate highly dynamic noise. This noise leads to frequent failure of controlled switches in the inverter stage of charging power supply. Designing a reliable and compatible power supply for pulse power applications is always a tricky job when charging rate is in multiples of 10 kJ/s. A ±50 kV and 45 kJ/s capacitor charging power supply based on 4th order LCLC resonant topology has been developed for a 10 Hz repetitive Marx based system. Conditions for load independent constant current and zero current switching (ZCS) are derived mathematically. Noise generated at load end due to dynamic load is tackled effectively and reduction in magnitude noise voltage is achieved by providing shielding between primary and secondary of high voltage high frequency transformer and with LCLC low pass filter. Shielding scales down the ratio between coupling capacitance (Cc) and the collector-emitter capacitance of insulated gate bi-polar transistor switch, which in turn reduces the common mode noise voltage magnitude. The proposed 4th order LCLC resonant network acts as a low pass filter for differential mode noise in the reverse direction (from load to source). Power supply has been tested repeatedly with 5 Hz repetition rate with repetitive Marx based system connected with BWO load working fine without failure of single switch in the inverter stage.

  10. Analysis of the 35 KV substation secondary system

    Science.gov (United States)

    Zhao, Yong; Jiang, Jianguo; Jiang, Chunlei; Ren, Shuang; Liu, Songbin

    2017-04-01

    This paper analyzes the status of the two system of some 35KV users' substation in Daqing oil field, the deficiencies of the two system of the existing 35KV substation are found out. And put forward the opinion of acceptance in the future work. I hope it can able to work in the future on the protection of professional help.

  11. 250 kV 6 mA compact Cockcroft-Walton high-voltage power supply

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Zhan-Wen; Su, Xiao-Dong; Wei, Zhen; Huang, Zhi-Wu; Miao, Tian-You; Su, Tong-Ling [School of Nuclear Science and Technology, Lanzhou University, Lanzhou 730000 (China); Lu, Xiao-Long; Wang, Jun-Run; Yao, Ze-En, E-mail: zeyao@lzu.edu.cn [School of Nuclear Science and Technology, Lanzhou University, Lanzhou 730000 (China); Engineering Research Center for Neutron Application, Ministry of Education, Lanzhou University, Lanzhou 730000 (China)

    2016-08-15

    A compact power supply system for a compact neutron generator has been developed. A 4-stage symmetrical Cockcroft-Walton circuit is adopted to produce 250 kV direct current high-voltage. A 2-stage 280 kV isolation transformer system is used to drive the ion source power supply. For a compact structure, safety, and reliability during the operation, the Cockcroft-Walton circuit and the isolation transformer system are enclosed in an epoxy vessel containing the transformer oil whose size is about ∅350 mm × 766 mm. Test results indicate that the maximum output voltage of the power supply is 282 kV, and the stability of the output voltage is better than 0.63% when the high voltage power supply is operated at 250 kV, 6.9 mA with the input voltage varying ±10%.

  12. Reliability assessment of Port Harcourt 33/11kv Distribution System ...

    African Journals Online (AJOL)

    This makes reliability studies an important task besides all the other analyses required for assessing the system performance. The paper presents an analytical approach in the reliability assessment of the Port Harcourt 33/11kV power distribution system. The assessment was performed with the 2009 power outage data ...

  13. The Reviewing of Distributed Power Sources Impact on Fallout’s Localization in 22 kV Network

    Directory of Open Access Journals (Sweden)

    Peter Bracinik

    2008-01-01

    Full Text Available The aim of this paper is to point out some facts that will occur by fault localization in 22 kV networks after the implementation of distributed power sources, especially wind power plants. This paper describes possible connection of these sources into power system in regard to their rated output. It also presents short theoretical background for short circuit calculation in 22 kV network. Then several examples explaining how the point of wind power plant connection can influence network’s operation during short-circuits and consequential fault’s localization are described in the second part of this paper

  14. Internal services simulation control in 220/110kV power transformer station Mintia

    Science.gov (United States)

    Ciulica, D.; Rob, R.

    2018-01-01

    The main objectives in developing the electric transport and distribution networks infrastructure are satisfying the electric energy demand, ensuring the continuity of supply to customers, minimizing electricity losses in the transmission and distribution networks of public interest. This paper presents simulations in functioning of the internal services system 400/230 V ac in the 220/110 kV power transformer station Mintia. Using simulations in Visual Basic, the following premises are taken into consideration. All the ac consumers of the 220/110 kV power transformer station Mintia will be supplied by three 400/230 V transformers for internal services which can mutual reserve. In case of damaging at one transformer, the others are able to assume the entire consumption using automatic release of reserves. The simulation program studies three variants in which the continuity of supply to customers are ensured. As well, by simulations, all the functioning situations are analyzed in detail.

  15. Performance of a 100-kV, 78-kJ electric-gun system

    International Nuclear Information System (INIS)

    Chau, H.; Dittbenner, G.; Mikkelsen, K.; Weingart, R.; Froeschner, K.; Lee, R.

    1981-01-01

    A new electric gun system was constructed for use in high-pressure EOS studies. The system is powered by a 100 kV, 15.6 μF capacitor bank. At 100 kV charging voltage the system inductance is 23 nH. This system has driven 0.3 mm-thick Kapton projectiles to > 20 km/s and 0.3 mm Kapton/30 μm Ta projectiles to approx. 10 km/s. Projectile velocity is modeled phenomenlogically by an electrical Gurney model

  16. Combined short and long term rating of static Var system components for steady state and transient voltage support in a 500 kV power grid

    Energy Technology Data Exchange (ETDEWEB)

    Paulsson, L; Silva, A; Thorvaldsson, B [ABB Power Systems AB, Vaesteraas (Sweden); Gonzalez, R [Northern States Power Co., Minneapolis, MN (United States)

    1994-12-31

    One efficient way to improve the power transmission performance is to provide appropriate reactive power balance and control in the network. Reactive power compensation by means of static var compensation (SVC) and series compensation (SC) are well established ways to achieve such improvement. The SVC, which is a relatively new concept, has now been used successfully for more than 15 years in EHV systems. This paper discusses a more general type of shunt compensation, designated Static var System (SVS), which may include breaker switched capacitor banks and other special features besides conventional SVC technology. (author) 4 figs.

  17. Electrical Energy Quality Studies in 3 kV DC Electric Traction Systems for Different Schemes of Connection Traction Substation to Power Utility System

    Directory of Open Access Journals (Sweden)

    Leszek Mierzejewski

    2004-01-01

    Full Text Available The paper present aspects of DC electric traction system influence on electric energetic system. Study is based on modeling and simulation of electrified railway line. After simulation, there was performed analysis of energy quality, whitch using results of simulation and supply systems parameters.

  18. Startup experience with the MFTF-B ECRH 100 kV dc power supply

    International Nuclear Information System (INIS)

    Bishop, S.R.; Goodman, R.A.; Wilson, J.H.

    1983-01-01

    One of the 24 Accel dc Power Supplies (ADCPS) originally intended for the Mirror Fusion Test Facility (MFTF-B) Neutral Beam Power Supply (NBPS) System has been converted to provide negative polarity output at 90 kV with a load current of 64 A dc. The load duty cycle is a pulse of 30-seconds duration with a pulse repetition period of five minutes. A new control system has been built which will serve as a prototype for the MFTF-B ADCPS controls, and a test setup was built which will be used to test the ADCPS. The Electron Cyclotron Resonance Heating (ECRH) dc Power Supply (DCPS) has been tested under both no-load and dummy-load conditions, under remote control, without notable problems. Test results indicate that the power supply should be reliable and safe to operate, and will meet the load duty requirements

  19. Startup experience with the MFTF-B ECRH 100 kV dc power supply

    International Nuclear Information System (INIS)

    Bishop, S.R.; Goodman, R.A.; Wilson, J.H.

    1983-01-01

    One of the 24 Accel DC Power Supplies (ADCPS) originally intended for the Mirror Fusion Test Facility (MFTF-B) Neutral Beam Power Supply (NBPS) System has been converted to provide negative polarity output at 90 kV with a load current of 64 A dc. The load duty cycle is a pulse of 30-seconds duration with a pulse repetition period of five minutes. A new control system has been built which will serve as a prototype for the MFTF-B ADCPS controls, and a test setup was built which will be used to test the ADCPS. The Electron Cyclotron Resonance Heating (ECRH) DC Power Supply (DCPS) has been tested under both no-load and dummy-load conditions, under remote control, without notable problems. Test results indicate that the power supply should be reliable and safe to operate, and will meet the load duty requirements

  20. Regulation System for the 18 kV/90 Mvar Compensators

    CERN Document Server

    Burdet, G

    2001-01-01

    Two 18 kV/90 Mvar static compensators are involved to stabilise the voltage, filter the harmonics and compensate the reactive power generated by the power converters used to supply the SPS accelerator magnets. The in-house hardware and software used by the regulation systems, difficult to maintain and upgrade, shall be renovated. Industrial solution based on PLC will be implemented. This paper describes the future system and its integration to the Electrical Network Supervisor.

  1. 40-kV, 25-ms neutral-beam power supply for TMX

    International Nuclear Information System (INIS)

    Leavitt, G.A.

    1977-01-01

    Modifications are described to upgrade the neutral-beam power supply for the TMX from 40 kV, 10 ms to 40 kV, 25 ms. The redesign of the accel and suppressor power supplies to achieve separation of the high-voltage and control sections, operation of the arc pulse lines in series, operation of the arc pulse lines in a noisy environment with SCR trigger and crowbar, and modifications to the electrolytic storage banks are discussed

  2. High power cable with internal water cooling 400 kV

    Science.gov (United States)

    Rasquin, W.; Harjes, B.

    1982-08-01

    Due to the concentration of electricity production in large power plants, the need of higher power transmissions, and the protection of environment, developement of a 400 kV water cooled cable in the power range of 1 to 5 GVA was undertaken. The fabrication and testing of equipment, engineering of cable components, fabrication of a test cable, development of cable terminal laboratory, testing of test cable, field testing of test cable, fabrication of industrial cable laboratory, testing of industrial cable, field testing of industrial cable, and system analysis for optimization were prepared. The field testing was impossible to realize. However, it is proved that a cable consisting of an internal stainless steel water cooled tube, covered by stranded copper profiles, insulated with heavy high quality paper, and protected by an aluminum cover can be produced, withstand tests accordingly to IEC/VDE recommendations, and is able to fulfill all exploitation conditions.

  3. submitter Development of a 100 kW, 12.5 kV, 22 kHz and 30 kV insulated medium frequency transformer for compact and reliable medium voltage power conversion

    CERN Document Server

    Isler, Stephane; Aguglia, Davide; Bonnin, Xavier Abel

    2017-01-01

    This paper presents the critical design aspects addressed during the development of a 100 kW, 12.5 kV, 22 kHz, and 30 kV insulated medium frequency transformer used in a power converter. The transformers are used in a resonant multilevel converter topology producing HV DC voltage from a three phase 400 V AC industrial grid. The power converter is used to supply radio frequency systems in particle accelerators. Considerations about material selection, dielectric, magnetic and thermal design are discussed and experimental results on the full scale transformer and power converter are presented.

  4. Synchronization of 67 MJ, 50 kV pulsed power capacitor banks operation

    Energy Technology Data Exchange (ETDEWEB)

    Besuglov, V G; Galakhov, I V; Gasheev, A S; Grusin, I A; Gudov, S N; Kirillov, G A; Murugov, V M; Osin, V A; Petrakov, V N [All-Russian Scientific Research Inst. of Experimental Physics, Sarov (Russian Federation)

    1997-12-31

    A sync system for the 67 MJ, 50 kV pulse power capacitor bank of the ISKRA-5 facility`s iodine laser is described. This system is to provide synchronism (a jitter within 0.3 {mu}s) in firing of 665 spark gaps, 476 electric discharge pumping sources and 513 flash lamps. The sync system is designed as series-voltage pulse generators to be fired at specifically predetermined times. Also, the system ensures switching of spark gaps in a sequence as required by the experiment and reliable operation of the pumping sources. Procedures to maintain high interference immunity for the system are also addressed. (author). 2 tabs., 2 figs., 2 refs.

  5. High power thyristors with 5 kV blocking voltage. Volume 1: Development of high-voltage-thyristors (4.5 kV) with good dynamic properties

    Science.gov (United States)

    Lock, K.; Patalong, H.; Platzoeder, K.

    1979-01-01

    Using neutron irradiated silicon with considerably lower spread in resistivity as compared to conventionally doped silicon it was possible to produce power thyristors with breakdown voltages between 3.5 kV and 5.5 kV. The thyristor pellets have a diameter of 50 mm. Maximum average on-state currents of 600 to 800 A can be reached with these elements. The dynamic properties of the thryistors could be improved to allow standard applications up to maximum repetitive voltages of 4.5 kV.

  6. Step-by-step application methodology in practical KEPCO 22.9kV bus-bar system

    International Nuclear Information System (INIS)

    Yoon, Jae-young; Lee, Seung-yeol

    2010-01-01

    With the increase of power demand and the progress of power industry deregulation, the transmission and distribution systems will have more complicated problems by the influence of curtailing investment and the NIMBY phenomena in overall power systems. [1-2] It is expected that the route length per MW demand of South Korea will decrease gradually from 0.6[C-km/MW] to 0.53[C-km/MW] in 2010.[3] This comes up to a real serious problem from system planning and operation viewpoints. HTS technologies related to power system have properties to solve these complex transmission and distribution constraints, especially for metropolitan area, in the future. As the HTS technology has developed, the HTS cable technology can be the most effective alternative to solve the future expected power network constraints. This paper describes the application methodology of developing 22.9kV HTS cable by CAST for practical distribution system. 22.9kV HTS cable under development with step-by-step application methodology can substitute the existing and planning conventional 154kV cable.[4-5] If this scheme is applied, part of downtown 154kV substation of metropolitan city such as Seoul can be changed into 22.9kV switching station. Additionally, it can give huge economic, environmental benefits to all of the concerned authorities.

  7. High power cable with internal water cooling 400 kV

    Energy Technology Data Exchange (ETDEWEB)

    Rasquin, W; Harjes, B

    1982-08-01

    The project was planned for a duration of 4 years. Afterwards it has been extended over 6 years and finally stopped after 3 1/2 years. Therefore, of course results of field tests with an internally cooled 400 kV cable are not available. Nevertheless, this conductor cooled high power cable has been developed to such an extend, that this manufactured cable could withstand type tests according to IEC/VDE recommendations. Even by missing field tests it is obvious that a high power cable for 400 kV is available.

  8. 100 kV solid-state switch for fusion heating systems

    International Nuclear Information System (INIS)

    Beaumont, B.; Bertrand, E.; Brugnetti, R.; Chatroux, D.; Kazarian, F.; Milly, R.; Prou, M.; Rigole, H.

    2005-01-01

    Power switching in RF heating systems is a delicate function as it is often linked to high power tube protection. In most RF systems, the end stage power tube is fed by a high voltage power supply (HVPS), which connection to the tube has to be interrupted in case of arc suspicion. The amount of energy that is allowable to be dissipated in the arc is in the range of 10-50 J, to limit the degradations observed on the tube structures. The protection function is usually performed by a crowbar. Furthermore, the HVPS is often shared by several power tubes, and the loss of all the power from the group of tubes is to be avoided to minimize the perturbation on the plasma experiment. A description of a 40 kV thyristor based crowbar and a 100 kV, 25 A MOSFET switch is given, as well as the contours of the existing components for high power switching applications. By combining small components, such as thyristors or MOSFET, in matrix, highly compact and reliable units have been built and implemented in Tore Supra RF systems

  9. Interlaboratory comparison of measuring results of magnetic field near 400 kV overhead power line

    Directory of Open Access Journals (Sweden)

    Grbić Maja

    2012-01-01

    Full Text Available The paper presents a comparison of measured results of magnetic field near 400 kV overhead power lines obtained by three laboratories. This interlaboratory comparison was performed to ensure confidence in the quality of the test results. The measured results were analyzed with standard methods, using En number, based on which the evaluation of the laboratories was performed.

  10. High power semiconductor switches in the 12 kV, 50 kA pulse generator of the SPS beam dump kicker system

    CERN Document Server

    Bonthond, J; Faure, P; Vossenberg, Eugène B

    2001-01-01

    Horizontal deflection of the beam in the dump kicker system of the CERN SPS accelerator is obtained with a series of fast pulsed magnets. The high current pulses of 50 kA per magnet are generated with capacitor discharge type generators which, combined with a resistive free-wheel diode circuit, deliver a critically damped half-sine current with a rise-time of 25 ms. Each generator consists of two 25 kA units, connected in parallel to a magnet via a low inductance transmission line.

  11. A study on the insulation coordination of 765 kV system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jeong Boo; Shim, Eung Bo [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center; Lee, Yong Han; Youn, Jae Yeong; Hwang, Chi Woo; Jung, Dong Hak [Korea Electrotechnology Research Inst., Changwon (Korea, Republic of)

    1996-12-31

    Analysis of the power frequency temporary overvoltage. Analysis of switching surges - Fault imitation, closing and re closing, fault clearing. Analysis of lightning surges. Insulation design of 765 kV overhead transmission line. Insulation coordination of 765 kV gas insulated substation. Transient recovery voltage and high speed ground switch (author). 38 refs., 55 figs.

  12. TS Seminar: Overview of Fermilab’s Power Distribution System

    CERN Multimedia

    CERN. Geneva

    2006-01-01

    A 27.5 km2 (6800 acre) site is powered by two 345 kV, two 34.5 kV, one 12.4 kV and five 7.2 kV lines. The talk gives an overview of Fermilab’s power distribution system with emphasis on accelerator power. The accelerator power distribution system provides 13.8 kV power to all accelerators and conventional loads. Design criteria, design features and operational experience are given.Organiser(s): F. Rodriguez-Mateos & Emmanuel Tsesmelis

  13. Design and development of a high-power, 500 kV pulsed line

    International Nuclear Information System (INIS)

    Nicolas, A.

    A study was made of very high voltage (500 kV) pulse production for 50 ns at half height. A coaxial line was coupled to a Marx generator for obtaining the pulses on an impedance-adapted electron diode. The maximum power obtained was 6.4 x 10 10 W with a current front in the diode of about 30 ns (80 ns pulse length at half height)

  14. On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberto Campos de; Oliveira, Mario Cesar Santos de [FURNAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The energy produced at the Itaipu Power Plant for the Brazilian Interconnected System is transmitted through two different transmission system: -HVDC system, with two bipoles of +- 600 kV, 6300 MW which connect the substation of Foz do Iguacu in the State of Parana, to substation of Ibiuna in the State of Sao Paulo, transmitting the energy generated in 50 Hz units. This system was entirely commissioned on september of 1987. (author) 3 refs., 5 figs.

  15. Improving the Transmission System Reliability for the 154kV Radial Network Operation

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Jin Boo; Yoo, Myeong Ho; Yoon, Young Beum; Kim, Tae Won [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Lee, Gi Won; Chung, Beom Jin; Jung, Jung Won; Park, Kyu Hyun; Lee, Myung Hee; Kim, Hyun Jong; Kim, Chae Hee [KEYIN CO., (Korea, Republic of)

    1996-12-31

    Analyzing that 154kV radial network current ed operated, we developed Automatic Power Reconfiguration System(APRS) which restore blackout area. It consists of special data acquisition system(DAU) and central monitoring system for reason of protecting currently operating power system. In addition, it communicates using optical communication network for high speed data transmission and accuracy. An Accuracy of operation and stability of the developed system is tested using Real Time Digital Simulator in 3-bus equivalent model system. In An Outage case, our developed system can restore a blackout area in three second. An ability of the restoration of a blackout was verified by simulations. For the field test, the developed system was set up at SINCHON S/S, SESOMUN S/S, SINDANG S/S and MAJANG S/S governed by Seoul Power Transmission Center. If the system reliability is proved for a one year test in real power system, application of the system will be extended to the other substations.

  16. Experimental investigations of overvoltages in 6kV station service cable networks of thermal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Vukelja, P.I.; Naumov, R.M.; Drobnjak, G.V.; Mrvic, J.D. [Nikola Tesla Inst., Belgrade (Yugoslavia)

    1996-12-31

    The paper presents the results of experimental investigations of overvoltages on 6kV isolated neutral station service cable networks of thermal power plants. The overvoltages were recorded with capacitive voltage measurement systems made at the Nikola Tesla Institute. Wideband capacitive voltage measurement systems recorded a flat response from below power frequencies to 10MHz. Investigations of overvoltages were performed for appearance and interruption of metal earth faults, intermittent earth faults, switching operation of HV motors switchgear, switching operation of transformers switchgear, and transfer of the network supply from one transformer to another. On the basis of these investigations, certain measures are proposed for limiting overvoltages and for the reliability of station service of thermal power plants.

  17. 130 kV 130 A High voltage switching mode power supply for neutral beam plasma heating: design issues

    International Nuclear Information System (INIS)

    Ganuza, D.; Del Rio, J.M.; Garcia, I.; Garcia, F.; Garcia de Madinabeitia, P.; Perez, A.; Zabaleta, J.R.

    2003-01-01

    The company JEMA has designed and manufactured two High Voltage Switching Mode Power Supplies (HVSMPS), rated at 130 kV dc and 130 A, each of which will feed the accelerator grids of two Positive Ion Neutral Injector (PINI) loads, to be installed at the Joint European Torus (EFDA-JET facility located at Culham, UK). The solution designed by JEMA includes two matching transformers which adapt the 36 kV of the JET AC power distribution network to the required 670 V at the secondary side. Additionally, such transformers provide a 30 deg.phase shift which is required by a 30000 A 12 pulse thyristor rectifier. The obtained and stabilised 650 V feed 120 IGBT invertors, which operate at 2778 Hz with modulated square waveform. Each invertor feeds a High Insulation High Frequency Transformer. The 120 transformers corresponding to one power supply are arranged in three oil filled tanks and provide the main insulation from the low voltage to the high voltage side. The square waveform obtained at the secondary of each transformer is rectified by means of a diode bridge. The connection in series of the 120 diode bridges provides the required 130 kV d.c. at the output. In order to protect the load, a redundant solid state crowbar has been designed. Such short circuiting device is composed of 26 Light Triggered Thyristors (LTTs), connected in series. Electrical simulations have been carried out in order to ensure that the system complies with the requirements of high accuracy and adequate protection of the load. The critical design of the High Voltage-High Frequency Transformers has also required electrostatic simulations of the electric field distribution

  18. On the prohibition of automatic redundant power supply of 6 and 0.4 kV auxiliary sections at Leningrad NPP

    International Nuclear Information System (INIS)

    Mokeev, S.F.

    1987-01-01

    At Leningrad NPP the automatic switching on of the auxiliary power supply sources of 6 and 0.4 kV is prohibited to provide personnel safety and preserve destruction of electroequipment. With excess of current maximum value in the 6 kV section immediate detachment of all electric motors occurs. At that moment by the switchers detechment emergency signal it occurs immediate swithing on of auxiliary systems or emergency switching on of auxiliary supply of the main circulating pumps, that insreases abruptly operation reliability of plant technological department

  19. Systems for protection and automation of distribution electric networks 22 kv

    International Nuclear Information System (INIS)

    Horak, M.

    2012-01-01

    This article deals with the new concept of fault location in overhead and cable 22 kV distribution systems, which are operated by ZSE Distribucia, a.s.. In the past the localisation of faults was a demanding and lengthy procedure, because the electric protection indicated only the affected output feeder. The exact fault point was then localised by manipulation in the field and by test switching in the power line where the fault took place. The current development of electric facilities and sharp fall in prices give use the possibility to broadly apply the simple digital metering devices equipped with the electric protection function. Once these devices are positioned densely along the individual power lines of the network, it is possible to localise the failure position quite exactly and electricity supply can be quickly restored. (Authors)

  20. Design and test of-80 kV snubber core assemblies for MFTF sustaining-neutral-beam power supplies

    International Nuclear Information System (INIS)

    Bishop, S.R.; Mayhall, D.J.; Wilson, J.H.; De Vore, K.R.; Ross, R.I.; Sears, R.G.

    1981-01-01

    Core snubbers, located near the neutral beam source ends of the Mirror Fusion Test Facility (MFTF) Sustaining Neutral Beam Power Supply System (SNBPSS) source cables, protect the neutral beam source extractor grid wires from overheating and sputtering during internal sparkdowns. The snubbers work by producing an induced counter-emf which limits the fault current and by absorbing the capacitive energy stored on the 80 kV source cables and power supplies. A computer program STACAL was used in snubber magnetic design to choose appropriate tape wound cores to provide 400 Ω resistance and 25 J energy absorption. The cores are mounted horizontally in a dielectric structure. The central source cable bundle passes through the snubber and terminates on three copper buses. Multilam receptacles on the buses connect to the source module jumper cables. Corona rings and shields limit electric field stresses to allow close clearances between snubbers

  1. Do kV really make everything look grey? A comparative study of 600 kV computed tomography systems; Macht kV wirklich grau? Eine Vergleichsstudie zu 600 kV Computertomografiesystemen

    Energy Technology Data Exchange (ETDEWEB)

    Krumm, Michael; Sauerwein, Christoph; Haemmerle, Volker; Knupe, Gunnar [RayScan Technologies GmbH, Meersburg (Germany)

    2013-07-01

    In the automotive industry there is a manufacture of cast aluminium parts of considerable thickness. Growing importance is being attached to methods of nondestructive testing and full metrological characterisation of these parts. A major contribution to this end has been made by the latest generation of CT systems, whose 600 kV X-ray tubes and line detectors make for excellent image quality. The purpose of the present study was to make an objective assessment of the performance of these CT systems by examining the advantages and drawbacks of each. This included comparisons of various parameters such as tube voltage and exposure time as well as different tube and detector technologies and CT measurement methods.

  2. Major Refit for CERN's 400 kV Substation (Part of the new control and protection system for the 18 kV side)

    CERN Document Server

    2001-01-01

    The 400 kV substation on the Prévessin site brings in the electricity that powers CERN's accelerators and the majority of the Laboratory's installations. It was originally built in the 1970s for the SPS, and is one of only five privately owned 400 kV sub-stations in France. Three of the others belong to the national railway company, SNCF, supplying the Paris-Marseilles TGV line, the other is at the Cadarache research centre near mouth of the Rhone. After nearly thirty years of service, CERN's substation has just undergone a complete overhaul.

  3. Hybrid system power generation'wind-photovoltaic' connected to the ...

    African Journals Online (AJOL)

    Hybrid system power generation'wind-photovoltaic' connected to the ... from Hybrid System, power delivered to or from grid and phase voltage of the inverter leg. ... Renewable Energy, Electrical Network 220 kV, Hybrid System, Solar, MPPT.

  4. Electronics system for the 150 kV negative ion test stand at BNL

    International Nuclear Information System (INIS)

    Larson, R.A.

    1977-01-01

    The 150 kV test stand at BNL is being used to investigate the extraction, acceleration and transport problems associated with the development of intense negative ion beams. The power supplies associated with these functions as well as the control and monitoring electronics are described

  5. Construction of a 500 kV aerial power line in East Java

    Energy Technology Data Exchange (ETDEWEB)

    Kaeufl, O; Paschen, R; Kummermehr, R

    1987-10-12

    The authors report on the technical preparations and the construction of a 500 kv, four-bundle power line with a pylon tonnage of approximately 10,000 t of steel and a route length of 251 km in Indonesia. Due to the difficult terrain conditions, the sensitive infrastructure and the extremely short construction period, this project was a special technological challenge. Initially, the authors explain the technical planning of Brown Boveri with emphasis on foundations and assembly. As part of this tailor-made concept new technological solutions were used. They were instrumental in the successful completion of the project in only 19 months by the end of 1986 to the complete satisfaction of the customer. The authors also comment on the pracitcal experiences gained during the construction.

  6. Quality control of a kV cone beam computed tomography imaging system

    International Nuclear Information System (INIS)

    Marguet, M.; Bodez, V.

    2009-01-01

    Purpose: This work presents the introduction of a quality assurance program for the On-Board Imager (O.B.I., Varian) kV cone beam computed tomography (kV C.B.C.T.) system, together with the results of 1 year monthly testing. Materials and methods: Firstly the geometric precision and stability of the equipment and of the associated software were evaluated using the Marker phantom. The coincidence of the accelerator isocenter and the imager isocenter was verified as well as the accuracy of the registration of kV cone beam computed tomography (kV C.B.C.T.) with reference CT images. Then, the kV C.B.C.T. image quality was evaluated using the Catphan 504 phantom and ArtiScan software (Aquilab) for both full-fan (F.F.) and half-fan (H.F.) imaging modes. Results: The kV C.B.C.T. isocenter and image registration with correction of the table position were found to be within a tolerance of 2.0 mm. Concerning the kV C.B.C.T. image quality, image noise and uniformity, the Hounsfield units (HU) stability and linearity, geometric distortion and high contrast resolution were all found to be within the manufacturer's recommendations for both F.F. and H.F. modes. However, the low contrast resolution for the HF mode did not meet the manufacturer's specifications. Conclusion: The quality assurance tests introduced have defined the initial system characteristics and their evolution during a period of 1 year, demonstrating the stability of the O.B.I.. (authors)

  7. Comparative assessment of 3.3kV/400A SiC MOSFET and Si IGBT power modules

    DEFF Research Database (Denmark)

    Ionita, Claudiu; Nawaz, Muhammad; Ilves, Kalle

    2017-01-01

    In this paper, a comparative evaluation between a commercial 3.3 kV/400 A Si-IGBT and a 3.3 kV/400 A SiC MOSFET power module in half-bridge configuration is presented. With a constant current of 250 A, a lower forward voltage (VDS) drop of 1.6 V is obtained for SiC MOSFET at 300 K compared to Si ...... the pulse duration was increased to 4 μs, where a short-circuit energy of 9.1 J was obtained. The cause of the failure is the thermal runaway leading to a drain-source short....

  8. Analisis Pembebanan Ekonomis pada Jaringan 500 kV Jawa Bali Menggunakan Software PowerWorld

    Directory of Open Access Journals (Sweden)

    Badru Tamam Arozaq

    2012-09-01

    Full Text Available Pada jaringan 500 kV Jawa Bali, PT. PLN (Persero P3B menentukan kombinasi pembangkit yang akan beroperasi pada setiap level beban tertentu. Oleh karena itu, Economic Dispatch (ED atau pembagian pembebanan secara ekonomis dilakukan untuk menghasilkan pembebanan pembangkit yang optimal. Namun, hasil dari Economic Dispatch tersebut belum tentu dapat memenuhi batasan sistem seperti batasan pembakitan generator dan batasan saluran. Untuk itu, Optimal Power Flow (OPF perlu dilakukan dalam rangka pembagian pembebanan secara ekonomis, sekaligus memenuhi batasan-batasan sistem. Pada tugas akhir ini, perhitungan pembagian pembebanan pembangkit dilakukan dengan menggunakan software PowerWorld. Software ini memiliki keunggulan dalam teknik analisis, interaktif, dan disertai dengan grafik, sehingga mempermudah pembaca dalam memahami informasi yang diberikan. Dari hasil pengujian, terbukti bahwa pada keadaan normal ED dan OPF dalam penggunaan software PowerWorld, menghasilkan nilai yang sama yaitu sebesar 662.264,94 $/h. Tetapi pada saat terjadi pelanggaran batas saluran transmisi, hasil simulasi ED lebih murah yaitu sebesar 665.834,06 $/h sedangkan hasil OPF sebesar 863.630,50 $/h.

  9. French 400 kV network

    Energy Technology Data Exchange (ETDEWEB)

    Pelissier, R

    1965-11-01

    A 400 kV transmission network has been constructed to carry hydroelectric power from the Alps and the Massif Central to Paris at peak hours and to carry power in the reverse direction in off-peak hours. A double circuit-ring at 400 kV encircling the Paris region is also nearing completion. Measures have to be taken to counter the very high short-circuit currents in such a network. A 730 kV network will eventually become necessary. The consequent multiplicity of transmission voltages will give rise to further problems. Collaboration with neighboring countries is envisaged. The problems of stability and synchronization posed by the new system are described and solutions suggested. The new circuit-breaking requirements are discussed, and details of tower design for 400 kV and 730 kV are given.

  10. Reconstruction of -35 kV/200 kW HVPS for test of klystron units in LHCD system

    International Nuclear Information System (INIS)

    Huang Yiyun

    2004-01-01

    The paper introduces the -35 kV/200 kW high voltage power supply (HVPS) which is specially used to test klystron units in LHCD system. The new klystrons must be tested under high voltage level before operation and the old klystrons which have worked for a longtime must be exercised by HVPS in lower hybrid current drive (LHCD) system. As the former HVPS has some shortages in engineering design and operation design, the HVPS has to be modified and rebuilt by adopting new method and technology to solve existing bottle-neck problems. (author)

  11. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  12. Life Cycle Assessment on a 765 kV Venezuelan Transmission System

    International Nuclear Information System (INIS)

    Wang, Wenlu; Tremouille, Gilles; Beroual, Abderrahmane; Bessede, Jean-Luc

    2011-03-01

    The demand to preserve the environment and form a sustainable development is greatly increasing in the recent decades all over the world, and this environmental concern is also merged in electrical power industry, resulting in many eco-design approaches in T and D industries. As a method of eco-design, Life Cycle Assessment (LCA) is a systematic tool that enables the assessment of the environmental impacts of a product or service throughout its entire life cycle, i.e. raw material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence. In T and D industries, LCA has been done for a lot of products individually, in order to see one product's environmental impacts and to seek for ways of improving its environmental performance. This eco-design for product approach is a rather well-developed trend, however, as only a single electrical product cannot provide the electrical power to users, electrical system consists of a huge number of components, in order to investigate system's environmental profile, the entire environmental profiles of different composing products has to be integrated systematically, that is to say, a system approach is needed. Under this philosophy, in this paper, an LCA using SimaPro (one kind of LCA software) is conducted on a whole Venezuelan 765 kV AC transmission system, which transmits 8000 MW hydro-electrical power through 760 km to this country's load centers, with total 7 substations, i.e. one sending end, 2 intermediate substations and 4 receiving ends. This LCA includes both transmission lines and substations, and then the environmental impacts of the whole transmission system are investigated. (authors)

  13. Decision and Order in the matter of an application by Superior Wind Prince Power Inc. for an Order or Orders pursuant to section 92 of the Ontario Energy Board Act, 1998 granting leave to construct a 230 kV transmission line and associated facilities to connect a proposed 99 MW wind farm to the transmission system of Great Lakes Power Ltd. near Sault Ste Marie[In the matter of the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Schedule B

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, G.; Betts, B.; Vlahos, P.

    2005-07-28

    Superior Wind Prince Power Inc. plans to construct and operate a 99 MW wind generation facility near Sault Ste. Marie, Ontario. It has also filed an application with the Ontario Energy Board to construct transmission facilities to connect the wind farm to the transmission system of Great Lakes Power Ltd. This includes a substation with a 34.5/230 kV transformer, a high voltage breaker, and low voltage switchgear. It also includes an 11.2 km long, 230 kV transmission line and a switching station with a 230 kV breaker and related facilities. The entire project is scheduled for completion by March, 2006. The Board will proceed with the application by way of a written hearing. This document presents evidence of the applicant with reference to the request for proposals for 300 MW of Renewable Energy. The wind farm includes 66 wind turbine generators providing an output of 99 MW. Plans for a second phase would add 101 MW to the wind farm. Different high voltage and low voltage configurations have been examined on the basis of environmental and economic considerations and system reliability. The best configuration was a 34.5 kV underground collector system and a 230 kV above ground transmission line. Four alternative routes for the line were examined on the basis of environmental, technical and economic factors. This document also provided evidence of PUC Distribution Inc. and addressed issues regarding a system impact assessment, customer impact assessment, and environmental assessment. The Board questioned whether the project is needed, what impact it will have on transmission rates, and reliability of supply. It also examined if all land-use matters have been addressed. The Board approved the project subject to certain conditions regarding communications, monitoring and reporting requirements. 2 refs., 1 appendix.

  14. Upgrade of a 30 kV/10 mA anode power supply for triode type gyrotron

    Energy Technology Data Exchange (ETDEWEB)

    Siravo, Ugo, E-mail: ugo.siravo@epfl.ch; Alberti, Stefano; Dubray, Jérémie; Fasel, Damien; Hogge, Jean-Philippe; Marlétaz, Blaise; Marmillod, Philippe; Perez, Albert; Silva, Miguel

    2015-10-15

    Highlights: • Triode type gyrotron is fed by 3 power supplies: the main, an anode PS(APS) and a heater. • This paper presents the upgrade of 3APS, supplied in 1999, that never fulfilled the specs. • The new working principle is very efficient, easy to implement, for a minimal cost. • Upgraded APS provides extended modulation capabilities, no overshoot and lowerripple. • This upgrade will allow exploring new operation regimes for the 3 TCV X3 gyrotrons. - The RF power of a gyrotron with a triode type magnetron-injection-gun (MIG) can be directly controlled via the voltage applied between its anode and its cathode. Hence, the performance of this type of gyrotron relies directly on the possibilities offered by the power supply controlling the anode to cathode voltage. For a system of gyrotrons connected to the same main high-voltage power supply, with a triode MIG one has the additional advantage of independently controlling each individual gyrotron. This paper presents the modifications brought to the three existing 30 kV/10 mA anode power supplies connected to the 500 kW/118 GHz/2s X3 gyrotrons operated on the TCV Tokamak. The new working principle based on phase-shift modulation (PSM) is described in detail. Experimental results obtained on dummy load are compared to simulations performed during the design phase. With respect to the initial working principle, the modulation frequency capability has been increased by a factor 10 reaching more than 5 kHz, whereas the output voltage ripple as well as the overshoot/undershoot have been significantly reduced.

  15. Design and test of a 40-kV, 80-A, 10-msec, neutral-beam power supply series

    International Nuclear Information System (INIS)

    North, G.G.

    1977-01-01

    To meet neutral-beam source requirements, a combination series switch/regulator system has been developed that can provide up to 40-kV at 80A output for 10-ms from the continuously decaying voltage of a charged capacitor bank. The system uses 100% feedback control of a series hard tube regulator. This feedback regulator is able to maintain a 40-kV output level for 100% load variations while the source voltage for the capacitor bank is drained from an initial 55-kV down to as low as 43-kV during a 10-ms pulse. In addition to controlling the output voltage, the series regulator tube also serves the dual role of a disconnect or interrupt switch at the end of each pulse and during the frequent occurrence of a neutral-beam source fault. In the interrupt mode, complete disconnect is achieved in less than 2-μs after first observance of a fault condition; recovery times to normal operation of less than 10-μs after fault clearance can be attained if desired

  16. End user reliability assessment of 1.2-1.7 kV commercial SiC MOSFET power modules

    DEFF Research Database (Denmark)

    Ionita, Claudiu; Nawaz, Muhammad

    2017-01-01

    This paper is a first attempt to offer reliability evaluation of full SiC power modules where several dies are connected in parallel to increase power rating capability. Here, five different power modules with voltage rating from 1.2-1.7 kV and current rating from 120-800 A from three vendors hav......, which is connected in parallel with the MOSFET chip. For another module, there has also been recorded a failure of the gate oxide during H3TRB....

  17. Major trends in the development of electrical power systems

    Energy Technology Data Exchange (ETDEWEB)

    Syromyatnikov, I A

    1965-01-01

    The comparison is made between the USA and the USSR electrical systems and their growth. The author states that USSR is about 35 years behind in the construction of power transmission lines of 22 kV and above. Various graphs of economic developments are presented. It is stated that the work in the near future should be concentrated on 750 kV network and on combining the USSR electric power distribution into a single power system.

  18. 10kV SiC MOSFET split output power module

    DEFF Research Database (Denmark)

    Beczkowski, Szymon; Li, Helong; Uhrenfeldt, Christian

    2015-01-01

    The poor body diode performance of the first generation of 10kV SiC MOSFETs and the parasitic turn-on phenomenon limit the performance of SiC based converters. Both these problems can potentially be mitigated using a split output topology. In this paper we present a comparison between a classical...

  19. Analysis of disturbances in the 15 kV traction power network by means of simulation calculations and tests; Analyse von Stoerungen im 15-kV-Bahnenergienetz durch Simulationsrechnungen und Versuche

    Energy Technology Data Exchange (ETDEWEB)

    Aeberhard, Martin; Basler, Egon [SBB AG, Zollikofen (Switzerland). Infrastruktur Energie

    2013-06-15

    Being one of the most important rail junctions of Switzerland, Olten is powered by a substation the 132 kV feeder of which features a number of structural weaknesses. Simulations were used to analyse the effects of electrical equipment failures in this substation on train operation, the nearby 15 kV overhead line system and the loads adjacent substations are subjected to. By considering all risks, a critical case of train operation with different load scenarios was investigated. The article includes a comparison between simulated and measured data and presents the conclusions that were drawn from the actions taken in respect of the future system design. (orig.)

  20. Modeling of Electric Field Around 100 MVA 150/20 KV Power Transformator Using Charge Simulation Method

    OpenAIRE

    Rachman, Noviadi Arief; Risdiyanto, Agus; Ramdan, Ade

    2013-01-01

    Charge Simulation Method is one of the field theory that can be used as an approach to calculate the electromagnetic distribution on the electrical conductor. This paper discussed electric field modeling around power transformator by using Matlab to find the safety distance. The safe distance threshold of the electric field to human health refers to WHO and SNI was 5 kV/m. The specification of the power transformator was three phases, 150/20 kV, and 100 MVA. The basic concept is to change the...

  1. DESIGN AND CONSTRUCTION OF A 12 kV DC POWER SUPPLY 175

    African Journals Online (AJOL)

    DR. AMINU

    voltage multiplying rectifier. It is suitable as a power supply for the nitrogen laser. .... (Hilborn, 1976), Raman spectroscopy (Kunabenchi, et al. 1982), and laser isotope ... laser consists of a channel that contains nitrogen gas, a switching system.

  2. Voltages and electric currents mensuration - class 15 kV - for systems electro-optical and magneto-optical; Medicao de tensoes e correntes - classe 15 kv - por sistemas eletro-opticos e magneto-opticos

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Marcos Rodrigues

    1996-07-01

    The technical feasibility of the development of a novel system measuring of high voltage and current in 15 kV distribution lines was presented. The system is basically the combination of two other systems, one conventional and other electro-optical. The conventional subsystem is based on voltage dividers and magnetic rings while the electro-optical subsystem uses LEDs, resistors, optical-fibers and photodetectors. The system was completely tested in laboratory and its main characteristics are low price, easy of installation and flexibility. Two software for data acquisition by GPIB and A/D boards were also developed. The can provide reports on voltages, currents, power and phase-power. (author)

  3. 130 kV 130 A high voltage switching mode power supply for neutral beam injectors-Control issues and algorithms

    International Nuclear Information System (INIS)

    Ganuza, D.; Garcia, F.; Zulaika, M.; Perez, A.; Jones, T.T.C.

    2005-01-01

    The company JEMA has delivered to the Joint European Torus (JET facility in Culham) two high voltage switching mode power supplies (HVSMPS) each rated 130 kVdc and 130 A. One HVSMPS feeds the grids of two PINI loads. This paper describes the main control issues and the algorithms developed for the project. The most demanding requirements from the control point of view is an absolute accuracy of ±1300 V and the possibility of performing up to 255 re-applications of the high voltage during a 20 s pulse. Keeping the output voltage ripple to the specified tolerance has been a major achievement of the control system. Since the output stage is formed of several modules (120) connected in series, their stray capacitance to ground significantly influences the individual contribution of each single module to the global output voltage. Two complementary techniques have been used to balance the effects of the stray capacities. The fast re-applications requirement has a significant impact on the intermediate dc link. This section is composed of a capacity of 0.83 F, which feeds the 120 invertor modules. The dc link is fed by a 12 pulse SCR rectifier, whose matching transformers are connected to the 36 kV grid. Every re-application and every voltage shutdown supposes a quasi-instantaneous power step of 17 MW. Fast open loop algorithms have been implemented in order to keep the dc link voltage within acceptable margins. Moreover, the HVSMPS output characteristics have to be maintained during the rapid and important voltage fluctuations of the 36 kV mains (28-37 kV). The general control system is based on a Simatic S7 PLC, and a SCADA user interface. Up to 1000 signals are acquired. The control system has shown to be also a useful tool to allow for a rapid and accurate identification of faults and their origin

  4. Design of full digital 50 kV electronic gun high voltage power supply

    International Nuclear Information System (INIS)

    Ge Lei; Shang Lei

    2014-01-01

    The design of full digital electronic gun high voltage power supply based on DSP was introduced in this paper. This power supply has innovations of full digital feedback circuit and PID closed-loop control mode. The application of high frequency resonant converter circuit reduces the size of the resonant element and transformer. The current-coupling distributed high voltage transformer and rectifier circuit were employed in this power supply. By this way, the power supply efficiency is improved and the number of distributed parameters is reduced, and the rectifier circuit could work under the oil-free environment. This power supply has been used in electronic grid-control high voltage system of the irradiation accelerator. (authors)

  5. System impact assessment report 115 kV interconnection between Cornwall system and Hydro One : final report

    International Nuclear Information System (INIS)

    2005-01-01

    Cornwall Electric (CE) is the local distribution company that serves the City of Cornwall, Ontario. The utility can be supplied from either Hydro Quebec, New York ISO or the IESO. CE has proposed to connect Rosemount, McConnell and Courtaulds substations to the IESO-controlled grid in order to obtain access to the competitively priced electricity in Ontario. The load connected to the 2 substations peaks in winter at about 100 MW. The 2 substations will be connected in stages. Only 40 MW of load from the Rosemount substation will be connected initially, followed by up to 100 MW from the McConnell and Courtaulds substation at a later date. The connection will be made through a circuit that taps into the St. Lawrence transmission station in Ontario. A new circuit will also be built and strung on existing towers. This document described the requirements for under-frequency load shedding; voltage reduction facilities; power factor; on-line monitoring; and system protections. According to data provided by Hydro One, the circuit is adequately rated to accommodate connection of the load from the Rosemount and McConnell and Courtaulds substations with no thermal overloading concerns. Winter load conditions were also considered. However, the IESO noted a potential reliability concern in the event that the Cardinal Power generating station is out of service and only one of the transformers connecting St. Lawrence 230 kV bus to St. Lawrence 115 kV bus is in service. However, the power transfers rated at 250 MVA are within the continuous rating of one transformer. It was concluded that the connection of the new load does not have an impact on the short circuit current at the St. Lawrence transmission station. The continuous thermal rating of the circuit is considered to be adequate for the proposed 100 MW of load transfer and the rating of the new line is sufficient to supply the total load at McConnell and Courtaulds. The ratings of the new disconnect switches meet market

  6. Commissioning and operation of 130 kV/130 A switched-mode HV power supplies with the upgraded JET neutral beam injectors

    International Nuclear Information System (INIS)

    Edwards, D.C.; Bigi, M.; Brown, D.P.D.; Ganuza, D.; Garcia, F.; Hudson, Z.; Jones, T.T.C.; Perez, A.

    2005-01-01

    The design features, on-site testing, commissioning and operation are described of two new 130 kV/130 A HV power supply units serving four upgraded 130 kV/60 A positive ion neutral injectors (PINIs) on JET. Both units were factory tested at full power and pulse length into dummy resistive load. Following on-site installation, the factory tests were repeated. The transition from dummy-load testing to PINI operation required full integration of the HVPS within the overall JET control system, and rigorous testing of the co-ordinated actions and protections of all PINI power supplies (filament and arc for plasma source and negative suppression grid). The implementation of these functions is described. Extensive use was made of parasitic integrated test pulses, where the other PINIs could be operated normally, with the HVPS energised under full remote control together with the corresponding PINI plasma sources, but with the HVPS connected to dummy load. The amount of NB operation time dedicated to commissioning was thereby minimised, yet gave a high degree of confidence of readiness for HV energisation of the PINI, and first beam operation followed less than 24 h from HV connection to the PINI. The routine operating experience and performance, including load protection characteristics of the new HVPS units are also described

  7. Increase in the number of distributed power generation installations in electricity distribution grids - Simulation in a 16 kV medium-voltage network; Zunahme der dezentralen Energieerzeugungsanlagen in elektrischen Verteilnetzen: Simulationen im 16 kV Mittelspannungsnetz des AEW

    Energy Technology Data Exchange (ETDEWEB)

    Hoeckel, M.; Luechinger, P.

    2003-07-01

    This is the seventh part of a ten-part final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This sixth appendix to the main report presents and discusses the results of simulations made on the basis of the real-life 16 kV medium-voltage distribution network operated by the Aargovian electricity utility AEW. This appendix describes the simulation methods used and the basic characteristics of medium-voltage networks and distributed generation facilities. Different types of load profiles, including domestic and industrial loads, are discussed. The results of the simulations are presented in graphical form and provide profiles of voltage and current, active and reactive power and further mains characteristics for varying load conditions. Also, daily profiles for situations with and without distributed generation are presented and short-circuit simulations and grid dynamics are discussed.

  8. Experiment and operation of a LHCD-35 kV/2.8 MW/1000 s high-voltage power supply on HT-7 tokamak

    International Nuclear Information System (INIS)

    Huang Yiyun

    2002-01-01

    A-35 kV/2.8 MW/1000s high-voltage power supply (HVPS) for HT-7 superconducting tokamak has been built successfully. The HVPS is scheduled to run on a 2.45 GHz/1 MW lower hybrid current drive (LHCD) system of HT-7 superconducting tokamak before the set-up of HT-7 superconducting tokamak in 2003. The HVPS has a series of advantages such as good steady and dynamic response, logical computer program controlling the HVPS without any fault, operational panel and experimental board for data acquisition, which both are grounded distinctively in a normative way to protect the main body of HVPS along with its attached equipment from dangers. Electric power cables and other control cables are disposed reasonably, to prevent signals from magnetic interference and ensure the precision of signal transfer. The author introduced the experiment and operation of a 35 kV/2.8 MW/1000 s HVPS for 2.45 GHz/1 MW LHCD system. The reliability and feasibility of the HVPS has been demonstrated in comparison with experimental results of original design and simulation data

  9. Implementation of Particle Swarm Optimization Method for Voltage Stability Analysis in 150 kV Sub System Grati – Paiton East Java

    Science.gov (United States)

    Kusumaningtyas, A. B.; Hidayat, M. N.; Ronilaya, F.

    2018-04-01

    Based on the data from State Electric Company on 15 January 2013, the undistributed power in the 150 kV sub system Grati-Paiton Region IV, that consist of 26 bus 150 kV and 2 bus generation 500 kV system, was recorded 3.286,00 MW. At the same time, the frequency of the system was down to 49 Hz. This lead to a deficit generation and unstable voltage condition in the system. Fast Voltage Stability Index (FVSI) method is used in this research to analyze the voltage stability of the buses. For buses with unstable voltage condition, reactive power will be injected through capacitor installation. The site where the capacitor will be installed is determined using the Fast Voltage Stability Index (FVSI) method while the size of the capacitor is determined using the Particle Swarm Optimization (PSO) method. The PSO method has been applied in some researches, such as to determine optimal placement and sizing in radial distribution network as well as in transmission network.. In this research, the PSO method is used to find the Qloss of an interconnection transmission system, which in turn, the value of the Qloss is used to determine the capacitance of the capacitor needed by the system.

  10. Evidence of Gate Voltage Oscillations during Short Circuit of Commercial 1.7 kV/ 1 kA IGBT Power Modules

    DEFF Research Database (Denmark)

    Reigosa, Paula Diaz; Wu, Rui; Iannuzzo, Francesco

    2015-01-01

    This paper analyzes the evidence of critical gate voltage oscillations in 1.7 kV/1 kA Insulated-Gate Bipolar Transistor (IGBT) power modules under short circuit conditions. A 6 kA/1.1 kV Non-Destructive Test (NDT) set up for repeatable short circuit tests has been built with a 40 nH stray inducta...

  11. Design and testing of 45 kV, 50 kHz pulse power supply for dielectric barrier discharges

    Science.gov (United States)

    Sharma, Surender Kumar; Shyam, Anurag

    2016-10-01

    The design, construction, and testing of high frequency, high voltage pulse power supply are reported. The purpose of the power supply is to generate dielectric barrier discharges for industrial applications. The power supply is compact and has the advantage of low cost, over current protection, and convenient control for voltage and frequency selection. The power supply can generate high voltage pulses of up to 45 kV at the repetitive frequency range of 1 kHz-50 kHz with 1.2 kW input power. The output current of the power supply is limited to 500 mA. The pulse rise time and fall time are less than 2 μs and the pulse width is 2 μs. The power supply is short circuit proof and can withstand variable plasma load conditions. The power supply mainly consists of a half bridge series resonant converter to charge an intermediate capacitor, which discharges through a step-up transformer at high frequency to generate high voltage pulses. Semiconductor switches and amorphous cores are used for power modulation at higher frequencies. The power supply is tested with quartz tube dielectric barrier discharge load and worked stably. The design details and the performance of the power supply on no load and dielectric barrier discharge load are presented.

  12. An operational 150 kV microfocus rod anode X-ray system for nondestructive testing

    International Nuclear Information System (INIS)

    Fontijn, E.A.

    1978-01-01

    This paper describes an operational state of the art 150 kV microfocus rod anode X-ray system having ultra-high radiographic resolution capabilities. A cocal spot size of 0.050 mm is provided. Heretofore unattainable long rod anode lengths coupled with very small diameters are now possible using mini-magnetic lens technology. Over-all rod anode diameters as small as 9 mm with useful lengths of 1 m or more are possible, permitting panoramic inspections where previously only lower resolution radioisotope radiographic techniques were possible. Radiographic sensitivity of better than 1% has been reported with film-focal-distances on the order of 8 mm through 3 mm of steel. The system has been successfully applied to steam generator and heat exchanger tube-to-tubesheet weldments in both Europe and the USA. Other application areas include marine and aircraft jet engine inspection and numerous other applications where high reliability requirements indicate the use of a ultra-sensitive radiographic technique as is routinely demonstrated with the 150 kV Microfocus Rod Anode X-ray System. (orig.) [de

  13. EFFECTS OF STEEL PLANTS WITH THREE-PHASE INDUCTION FURNACES ON POWER DISTRIBUTION QUALITY OF THE EXISTING 33 kV NETWORK IN NIGERIA

    Directory of Open Access Journals (Sweden)

    Saheed Lekan Gbadamosi

    2015-08-01

    Full Text Available This study aimed at evaluating and analyzing the voltage and current distortions on the introduction of a steel production plant in a typical 33 kV distribution system in Nigeria, with a view to assisting decisions made in the present system operation and planning effective service delivery in terms of quality. A three phase induction furnace was developed using MatLab Simulink software and the effects of steel plant loads on the quality of electric power system supply to electricity users on the same distribution network was analyzed in terms of total harmonic distortions of voltage and current. In order to evaluate voltage magnitude profile on the network, load flow computation and analyses were carried out on the 33 kV distribution network before and after the introduction of steel plant loads, using Successive Approximation Method. The results showed critical voltage magnitude profile below -5% of nominal voltage at the receiving end nodes. With the aid of the Matlab Simulink model, inadmissible voltage and current distortions of 15.47% and 10.35% were measured. Passive filter was proposed, designed and simulated, in order to mitigate these distortions caused by the steel production plant loads. By simulation, the installation of the designed passive filter gave a reduction of the distortions to permissible values. Further, for every 1 MW load increment when the steel plant is connected, network losses increased by 94%; however, for every of Mvar of filter capacity, loss reduction in the network is 5.1 MW.

  14. APPLICATION OF SSSC TO THE 330kV NIGERIAN ...

    African Journals Online (AJOL)

    HOD

    2,3 DEPARTMENT OF ELECTRONIC AND ELECTRICAL ENGR., FEDERAL POLYTECHNIC EDE, ... Longitudinal power systems of Nigerian 330 kV transmission network have steady-state ..... C tr ller ” Unpublish Master Thesis Submitted to.

  15. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  16. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  17. A Design of a 345-kV Electric Power Transmission Line Interlinking Ramu and Rouna Grids in Papua New Guinea

    Directory of Open Access Journals (Sweden)

    Sakato Francis

    2017-01-01

    Full Text Available According to PNG Power Limited (PPL, Papua New Guinea’s peak power demand is expected to increase from 210 MW in 2012 to 347 MW in 2026. Under the current state of the power sector in Papua New Guinea (PNG, it is critical to implement measures to cope with the increasing power demand to promote investment, economic growth, and ultimately to achieve poverty reduction through economic growth. One of the solutions identified to improve the reliability of PNG power systems and thus to meet the demand is to interconnect the major grids in the country so that the loads could be shared among them. This project embarks in designing a 345-kV electric power transmission line to interlink the Ramu and Rouna power grids of Papua New Guinea. The design is done by analysing all the necessary aspects of the transmission lines with in-depth calculations performed using MATHCAD software. This design is the basis for extra-high voltage (EHV transmission network in anticipation for the power generation and demand growth in PNG.

  18. Submicrosecond linear pulse transformer for 800 kV voltage with modular low-inductance primary power supply

    Energy Technology Data Exchange (ETDEWEB)

    Bykov, Yu. A.; Krastelev, E. G., E-mail: ekrastelev@yandex.ru; Popov, G. V.; Sedin, A. A.; Feduschak, V. F. [Russian Academy of Sciences, Joint Institute for High Temperatures (Russian Federation)

    2016-12-15

    A pulsed power source with voltage amplitude up to 800 kV for fast charging (350–400 ns) of the forming line of a high-current nanosecond accelerator is developed. The source includes capacitive energy storage and a linear pulse transformer. The linear transformer consists of a set of 20 inductors with circular ferromagnetic cores surrounded by primary windings inside of which a common stock adder of voltage with film-glycerol insulation is placed. The primary energy storage consists of ten modules, each of which is a low-inductance assembly of two capacitors with a capacitance of 0.35 μF and one gas switch mounted in the same frame. The total energy stored in capacitors is 5.5 kJ at the operating voltage of 40 kV. According to test results, the parameters of the equivalent circuit of the source are the following: shock capacitance = 17.5 nF, inductance = 2 μH, resistance = 3.2 Ω.

  19. A comparison of magnetic fields inside and outside high-voltage urban 110-kV power substations with the exposure recommendations of the Ukrainian regulatory authorities

    International Nuclear Information System (INIS)

    Okun, Oleksandr; Shevchenko, Sergey; Korpinen, Leena

    2013-01-01

    The aim of this study was to carry out theoretical investigations of power frequency magnetic fields (MFs), produced inside and outside the domain of urban 110-kV power substations and to establish a correspondence between the levels of the fields and the specified population limits as defined by Ukrainian regulations. The fields produced by high-voltage substations were studied based on the application of the numerical finite element methodology. The investigations have shown that magnetic flux density values calculated inside and outside the considered 110-kV power substations do not reach the exposure limits specified by the Ukrainian regulations (1750 μT) and by international guidelines (ICNIRP 2010). Inside the domain of the substation, the maximum value of MFs was found under the 10-kV bus-bars and it equalled 420 μT. (authors)

  20. Preliminary study on development of 300 Kv compact focused gaseous ion beam system

    Energy Technology Data Exchange (ETDEWEB)

    Ohkubo, T.; Ishii, Y.; Kamiya, T. [Takasaki Advanced Radiation Research Institute, Japan Atomic Energy Agency (JAEA) 1233 Watanuki-machi, Takasaki, Gunma, 370-1292 (Japan); Miyake, Y. [Beam Seiko Instruments Inc., 2-10-1 Kamata, Ohta-ku, Tokyo, 144-0052 (Japan)

    2013-04-19

    A new 300 kV compact focused gaseous ion beam (gas-FIB) system with three-stage acceleration lens was constructed at JAEA. The preliminary experiments of formation of the focused gaseous ion beams were carried out to show the availability of the gas-FIB system as a writing tool for 3D proton lithography. As a result of the experiments, it was proved that the focal point was kept at the same position under changing the kinetic energy but with keeping the kinetic energy ratio constant, which was defined as the ratio of kinetic energy in object side to that in image side for the third acceleration lens. This characteristic of the gas-FIB is a good point to advance the 3D proton lithography changing penetration depth in a sample by varying the beam energy.

  1. Preliminary study on development of 300 Kv compact focused gaseous ion beam system

    International Nuclear Information System (INIS)

    Ohkubo, T.; Ishii, Y.; Kamiya, T.; Miyake, Y.

    2013-01-01

    A new 300 kV compact focused gaseous ion beam (gas-FIB) system with three-stage acceleration lens was constructed at JAEA. The preliminary experiments of formation of the focused gaseous ion beams were carried out to show the availability of the gas-FIB system as a writing tool for 3D proton lithography. As a result of the experiments, it was proved that the focal point was kept at the same position under changing the kinetic energy but with keeping the kinetic energy ratio constant, which was defined as the ratio of kinetic energy in object side to that in image side for the third acceleration lens. This characteristic of the gas-FIB is a good point to advance the 3D proton lithography changing penetration depth in a sample by varying the beam energy.

  2. TFTR neutral beam power system

    International Nuclear Information System (INIS)

    Deitz, A.; Murray, H.; Winje, R.

    1977-01-01

    The TFTR NB System will be composed of four beam lines, each containing three ion sources presently being developed for TFTR by the Lawrence Berkeley Laboratories (LBL). The Neutral Beam Power System (NBPS) will provide the necessary power required to operate these Ion Sources in both an experimental or operational mode as well as test mode. This paper describes the technical as well as the administrative/management aspects involved in the development and building of this system. The NBPS will combine the aspects of HV pulse (120 kV) and long pulse width (0.5 sec) together to produce a high power system that is unique in the Electrical Engineering field

  3. Pharmacological dissection of K(v)7.1 channels in systemic and pulmonary arteries

    DEFF Research Database (Denmark)

    Chadha, Preet S; Zunke, Friederike; Davis, Alison J

    2012-01-01

    The aim of this study was to characterize the functional impact of KCNQ1-encoded voltage-dependent potassium channels (K(v)7.1) in the vasculature.......The aim of this study was to characterize the functional impact of KCNQ1-encoded voltage-dependent potassium channels (K(v)7.1) in the vasculature....

  4. Model for the ready definition and approximate comparison of alternative high voltage transmission systems. Phases II and III. Application to electric systems within the contiguous United States. [800 and 1200 kV; 400, 600, and 800 kV dc

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-01

    Research on power delivery alternatives is reported. The first phase of this work was to develop a model of overhead transmission systems in the range of 362 to 1200 kV ac, and +-400 to +-800 kV dc. Such systems included transmission from generation to load and inter-connection of two large integrated systems, with and without the existence of an underlying lower voltage network in either case. This phase has been completed. The second and third phases involved application of the model to electric systems within selected regions of the US, and the entire US, respectively, dealing with real situations and including projected expansion to year 1987. The potential benefits and costs of using higher than existing transmission voltages were to be evaluated on this basis. Additionally, the most advantageous new voltage was to be determined taking into account direct and indirect benefits and costs. The results of the second and third phases are presented.

  5. 110 kV NETWORK TECHNICAL LOSSES ASSESSMENT. REAL DISTRIBUTION SYSTEM CASE STUDY

    Directory of Open Access Journals (Sweden)

    BARBULESCU C.

    2015-06-01

    Full Text Available The paper is focusing on evaluating the technical losses within a real distribution network. The study was conducted for a distribution system operator within the Romanian Power System. The analysed area is represented by a real part of the Romanian Power System. It is modelled in a computer aided power system analysis tool. Several power system operating conditions are analysed. Power system optimization measures are provided having as a goal to reduce the technical losses' value. Values obtained based on the field measurement are compared to the ones provided by computer simulations. These conclusions are very useful for the distribution network operator.

  6. Numerical simulation research of 300 kV, 5 electrodes negative ion beam system

    International Nuclear Information System (INIS)

    Wang Huisan; Jian Guangde

    2001-01-01

    According to the characteristic of high current negative ion beam extraction and acceleration system for negative ion-based neutral beam injector, a numerical simulation model and a calculation code of the negative ion beam system are established in order to assist the design of the system. The movement behavior of the negative ion beam and accompanying electron beam in joint effect of the electric and magnetic field of the system is calculated. The effect of relative parameters on the negative ion beam optics characteristic is investigated, such as beam density, negative ion initial temperature and stripping losses, final electrode aperture displacement. The electromagnetic configuration in the system is optimized. The initial optimized results for the 300 kV, 5 electrodes negative ion beam system show that the magnetic field of this system can deflect the electron beam to the extraction electrode as electron acceptor at lower energy and that assuming 20% stripping losses of the H - ion in extraction region and 21 mA ·cm -2 extracted H - beam density, the r.m.s. divergence angle of all output beam lets and divergence angle of 85% output beam lets are 0.327 deg. and 0.460 deg., respectively

  7. Modeling of Electric Field Around 100 MVA 150/20 kV Power Transformator using Charge Simulation Method

    Directory of Open Access Journals (Sweden)

    Noviadi Arief Rachman

    2013-07-01

    Full Text Available Charge Simulation Method is one of the field theory that can be used as an approach to calculate the electromagnetic distribution on the electrical conductor. This paper discussed electric field modeling around power transformator by using Matlab to find the safety distance. The safe distance threshold of the electric field to human health refers to WHO and SNI was 5 kV/m. The specification of the power transformator was three phases, 150/20 kV, and 100 MVA. The basic concept is to change the distribution charge on the conductor or dielectric polarization charge with a set of discrete fictitious charge. The value of discrete fictitious charge was equivalent to the potential value of the conductor, and became a reference to calculate the electric field around the surface contour of the selected power transformator. The measurement distance was 5 meter on each side of the transformator surface. The results showed that the magnitude of the electric field at the front side was 5541 V/m, exceeding the safety limits.

  8. Non-destructive test for VHTR fuel using 160kV X-ray system in Hotcell

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Jun; Yoo, Boung Ok; Choo, Yong sun; Baik Sang youl; Kim, Hee Moon; Ahn, Sang Bok [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The research for VHTR which is one of the next generation reactor has been actively carried out. As a part of the research for VHTR, an irradiation examination for the VHTR fuel was performed to confirm an in-pile behavior in HANARO. The non-destructive test for the irradiated fuel is very important to understand the in-pile behavior of the fuel. Especially, the X-ray system is useful to observe the fuel shape without destruction. A dimensional change and defect of the fuel can be confirmed thorough the Xray system. Also, using the 3-D software and CT technology, the fuel shape can be intuitionally observed. The 450kV and 160kV X-ray system were installed and operated in IMEF hotcell. The 160kV X-ray system relatively using a low voltage is suitable to a small scale sample. And high resolution images can be obtained. In this study, the non-destructive test for the unirradiated and irradiated VHTR fuel were performed using the 160kV X-ray system. Through these test, the possibility for the X-ray inspection of irradiated fuel was confirmed. The non-destructive test for the unirradiated and irradiated VHTR fuel were performed using the 160kV X-ray system. The clear images of the irradiated coated particle were produced without the radiation damage during the Xray inspection. The X-ray images of the VHTR fuel will be utilized as the in-pile performance validation data.

  9. Non-destructive test for VHTR fuel using 160kV X-ray system in Hotcell

    International Nuclear Information System (INIS)

    Kim, Young Jun; Yoo, Boung Ok; Choo, Yong sun; Baik Sang youl; Kim, Hee Moon; Ahn, Sang Bok

    2016-01-01

    The research for VHTR which is one of the next generation reactor has been actively carried out. As a part of the research for VHTR, an irradiation examination for the VHTR fuel was performed to confirm an in-pile behavior in HANARO. The non-destructive test for the irradiated fuel is very important to understand the in-pile behavior of the fuel. Especially, the X-ray system is useful to observe the fuel shape without destruction. A dimensional change and defect of the fuel can be confirmed thorough the Xray system. Also, using the 3-D software and CT technology, the fuel shape can be intuitionally observed. The 450kV and 160kV X-ray system were installed and operated in IMEF hotcell. The 160kV X-ray system relatively using a low voltage is suitable to a small scale sample. And high resolution images can be obtained. In this study, the non-destructive test for the unirradiated and irradiated VHTR fuel were performed using the 160kV X-ray system. Through these test, the possibility for the X-ray inspection of irradiated fuel was confirmed. The non-destructive test for the unirradiated and irradiated VHTR fuel were performed using the 160kV X-ray system. The clear images of the irradiated coated particle were produced without the radiation damage during the Xray inspection. The X-ray images of the VHTR fuel will be utilized as the in-pile performance validation data.

  10. Construction and 60 kV tests of the prototype pulser for the LHC injection kicker system

    CERN Document Server

    Barnes, M J; Carlier, E; Ducimetière, L; Schröder, G; Vossenberg, Eugène B

    1999-01-01

    The European Laboratory for Particle Physics (CERN) is constructing the Large Hadron Collider (LHC). Two counter-rotating proton beams will be injected into the LHC at an energy of 450 GeV by two kicker magnet systems, producing magnetic field pulses of approximately 900 ns rise time and 6.6 mu s flat top duration with a ripple of less than +or-0.5Both injection systems are composed of 4 travelling wave kicker magnets of 2.17 m length each, powered by pulse forming networks (PFNs). To achieve the high-required kick strength of 1.2 Tm, for a compact and cost efficient design, a characteristic impedance of 5 Ohms has been chosen. The design strategy for the magnets and generators has been defined after detailed analysis of existing systems. The electrical circuit has been optimised using the circuit analysis software PSpice. Most known parasitics have been modelled. A prototype PFN has been constructed at CERN and successfully tested at 60 kV. A calibration procedure has been developed and utilised for obtainin...

  11. Microprocessor supervised stability control system for the united power system of Middle Volga in fault conditions

    Energy Technology Data Exchange (ETDEWEB)

    Berdnikov, V I; Birgel, E R; Kovalev, V D; Kuznestov, A N

    1994-12-31

    The development of the 500 kV UPS of Middle Volga, the complication of its configuration and operating conditions particularly in connection with concentration of the generating power at Balakovo NPS have aggravated the problem of stability of the Middle Volga UPS when high power is transmitted along the 500 kV transient system. In this case the necessity for improving control actions` dosage accuracy has also appeared. This work discusses solution to the above mentioned issue. (author) 3 figs.

  12. TFTR neutral-beam power system

    International Nuclear Information System (INIS)

    Winje, R.A.

    1982-10-01

    The TFTR Neutral Beam Power System (NBPS) consists of the accelerator grid power supply and the auxiliary power supplies required to operate the TFTR 120-keV ion sources. The current configuration of the NBPS including the 11-MVA accelerator grid power supply and the Arc and Filament power supplies isolated for operation at accelerator grid voltages up to 120 kV, is described. The prototype NBPS has been assembled at the Princeton Plasma Physics Laboratory and has been operated. The results of the initial operation and the description and resolution of some of the technical problems encountered during the commissioning tests are presented

  13. High voltage system design for the IUCF 300 KV electron cooling system

    International Nuclear Information System (INIS)

    Bertuccio, T.; Brown, B.; Donica, G.; Ellison, T.; Friesel, D.L.

    1985-01-01

    A summary of the electron beam high voltage system design for the IUCF Cooler now under construction, is presented. There are extremely stringent regulation requirements (about 10ppm) on the main high voltage power supply (-300 kVDC, 15 mA), and less stringent requirements on the gun anode power supply, in order to achieve the regulation needed to store beams in the IUCF Cooler with very low momentum spreads (Δp/p approx. = 2 x 10 -5 ). An overview of the main high voltage power supply (HVPS) specifications and design, as well as provisions and plans to improve the regulation are discussed. The electron collection system, modeled after the FNAL collector which was able to collect between 99.9% and 99.99% of the electron beam, is discussed along with the requirements of the associated power supplies. The designs of the high voltage acceleration structures and high voltage platform are discussed, as well as practical design considerations based upon experience with the Fermilab 120 keV electron cooling system

  14. A 600kV 15mA Cockcroft-Walton high-voltage power supply with high stability and low-ripple voltage

    International Nuclear Information System (INIS)

    Su Tongling; Zhang Yimin; Chen Shangwen; Liu Yantong; Lv Huiyi; Liu Jiangtao

    2006-01-01

    A Cockcroft-Walton high-voltage power supply with high stability and low-ripple voltage has been developed. This power supply has been operated in a ns pulse neutron generator. The maximum non-load voltage is 600kV while the working voltage and load current are 550kV and 15mA, respectively. The tested results indicate that when the power supply is operated at 300kV, 6.7mA and the input voltage varies +/-10%, the long-term stability of the output voltage is S=(0.300-1.006)x10 -3 . The ripple voltage is δU P-P =6.2V at 300kV, 6.8-8.3mA and the ratio of δU P-P to the output voltage V H is δU P-P /V H =2.1x10 -5

  15. Voltage and reactive power in the 380/220 kV power network of the new German Laender - state and prospects. Spannung und Blindleistung im 380/220-kV-Verbundnetz der neuen Bundeslaender - Stand und Ausblick

    Energy Technology Data Exchange (ETDEWEB)

    Behnke, M; Luettig, K; Radtke, H [Verbundnetz Elektroenergie AG, Berlin (Germany)

    1991-01-01

    With the preparation for restoring a German power network after nearly 40 years of separate development of the EES of the former DDR, the voltage/reactive power regulation must be examined and evaluated in the conditions of: - parting the connections to the present VES partners Poland and Czechoslovakia with the option of rectification - taking up parallel operation with the adjacent network undertakings of the old West German Laender (Preussen Elektra AG and Bayernwerke AG), ie: combined operation with DVG (superregional network of old West German Laender) and UCPTE (European electrical energy union). The aim is to configure this in the 380/220 kV network of the new German Laender, so that with a regionally compensated reactive power system, the voltage can be kept steady much better at times of heavy and light load, and the network losses can be reduced. (orig./GL).

  16. A robust and stable PLC based control system for 40kJ/25kV EMM system

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Vijay; Saroj, P.C.; Kulkarni, M.R.; Kumar, Satendra, E-mail: vijay9819420563@gmail.com [Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, Mumbai (India)

    2014-07-01

    This paper describes the PLC based control system developed for a 40kJ/25kV Electro-magnetic machining (EMM) system. In EMM system large capacitor banks is charged with high voltage to store large energy and the banks is made to discharge into a coil within few milli-seconds using a triggered spark gaps. During discharge of the capacitor large surges and transients are generated in the system. The control system monitors/controls and interlocks all the units of the system for proper operation. The control system is the only subsystem which is electrically connected to all the low and high voltage subsystems. Care should be taken at the signal interfacing with the control system to protect the control system. (author)

  17. A robust and stable PLC based control system for 40kJ/25kV EMM system

    International Nuclear Information System (INIS)

    Sharma, Vijay; Saroj, P.C.; Kulkarni, M.R.; Kumar, Satendra

    2014-01-01

    This paper describes the PLC based control system developed for a 40kJ/25kV Electro-magnetic machining (EMM) system. In EMM system large capacitor banks is charged with high voltage to store large energy and the banks is made to discharge into a coil within few milli-seconds using a triggered spark gaps. During discharge of the capacitor large surges and transients are generated in the system. The control system monitors/controls and interlocks all the units of the system for proper operation. The control system is the only subsystem which is electrically connected to all the low and high voltage subsystems. Care should be taken at the signal interfacing with the control system to protect the control system. (author)

  18. Reliability improvement of potential transformer and secondary circuit of 6 kV 1E-class buses in Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Qian Houjun

    2014-01-01

    There are design defects in potential transformer (PT) and secondary circuit of 6 kV 1E-class buses in Qinshan Nuclear Power Plant Nuclear Island. During the operating period, there happened several serious operational events (loss of power) caused by PT resonance. The essay analyses the defects of original design, and put forward corresponding modification measures, which have been carried out by two steps between 2009 and 2010, and after the modification the same problems have not happened again. (author)

  19. Stockholm Power Tech. Power systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The proceedings from this symposium is presented in six volumes: Invited speakers` sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  20. Stockholm Power Tech. Power systems

    International Nuclear Information System (INIS)

    1995-01-01

    The proceedings from this symposium is presented in six volumes: Invited speakers' sessions; Power systems; Power electronics; High-voltage technology; Electrical machines and drives; and Information and control systems. This report covers the power systems volume. Separate abstracts have been prepared for 141 of the 145 papers in this volume

  1. Development of a 33 kV, 20 A long pulse converter modulator for high average power klystron

    Energy Technology Data Exchange (ETDEWEB)

    Reghu, T.; Mandloi, V.; Shrivastava, Purushottam [Pulsed High Power Microwave Section, Raja Ramanna Centre for Advanced Technology, Indore 452013, M.P. (India)

    2014-05-15

    Research, design, and development of high average power, long pulse modulators for the proposed Indian Spallation Neutron Source are underway at Raja Ramanna Centre for Advanced Technology. With this objective, a prototype of long pulse modulator capable of delivering 33 kV, 20 A at 5 Hz repetition rate has been designed and developed. Three Insulated Gate Bipolar Transistors (IGBT) based switching modules driving high frequency, high voltage transformers have been used to generate high voltage output. The IGBT based switching modules are shifted in phase by 120° with respect to each other. The switching frequency is 25 kHz. Pulses of 1.6 ms pulse width, 80 μs rise time, and 70 μs fall time have been achieved at the modulator output. A droop of ±0.6% is achieved using a simple segmented digital droop correction technique. The total fault energy transferred to the load during fault has been measured by conducting wire burn tests and is found to be within 3.5 J.

  2. Development of a 33 kV, 20 A long pulse converter modulator for high average power klystron

    International Nuclear Information System (INIS)

    Reghu, T.; Mandloi, V.; Shrivastava, Purushottam

    2014-01-01

    Research, design, and development of high average power, long pulse modulators for the proposed Indian Spallation Neutron Source are underway at Raja Ramanna Centre for Advanced Technology. With this objective, a prototype of long pulse modulator capable of delivering 33 kV, 20 A at 5 Hz repetition rate has been designed and developed. Three Insulated Gate Bipolar Transistors (IGBT) based switching modules driving high frequency, high voltage transformers have been used to generate high voltage output. The IGBT based switching modules are shifted in phase by 120° with respect to each other. The switching frequency is 25 kHz. Pulses of 1.6 ms pulse width, 80 μs rise time, and 70 μs fall time have been achieved at the modulator output. A droop of ±0.6% is achieved using a simple segmented digital droop correction technique. The total fault energy transferred to the load during fault has been measured by conducting wire burn tests and is found to be within 3.5 J

  3. Development of a 33 kV, 20 A long pulse converter modulator for high average power klystron

    Science.gov (United States)

    Reghu, T.; Mandloi, V.; Shrivastava, Purushottam

    2014-05-01

    Research, design, and development of high average power, long pulse modulators for the proposed Indian Spallation Neutron Source are underway at Raja Ramanna Centre for Advanced Technology. With this objective, a prototype of long pulse modulator capable of delivering 33 kV, 20 A at 5 Hz repetition rate has been designed and developed. Three Insulated Gate Bipolar Transistors (IGBT) based switching modules driving high frequency, high voltage transformers have been used to generate high voltage output. The IGBT based switching modules are shifted in phase by 120° with respect to each other. The switching frequency is 25 kHz. Pulses of 1.6 ms pulse width, 80 μs rise time, and 70 μs fall time have been achieved at the modulator output. A droop of ±0.6% is achieved using a simple segmented digital droop correction technique. The total fault energy transferred to the load during fault has been measured by conducting wire burn tests and is found to be within 3.5 J.

  4. Comparison between IEEE and CIGRE Thermal Behaviour Standards and Measured Temperature on a 132-kV Overhead Power Line

    Directory of Open Access Journals (Sweden)

    Alberto Arroyo

    2015-12-01

    Full Text Available This paper presents the steady and dynamic thermal balances of an overhead power line proposed by CIGRE (Technical Brochure 601, 2014 and IEEE (Std.738, 2012 standards. The estimated temperatures calculated by the standards are compared with the averaged conductor temperature obtained every 8 min during a year. The conductor is a LA 280 Hawk type, used in a 132-kV overhead line. The steady and dynamic state comparison shows that the number of cases with deviations to conductor temperatures higher than 5 ∘ C decreases from around 20% to 15% when the dynamic analysis is used. As some of the most critical variables are magnitude and direction of the wind speed, ambient temperature and solar radiation, their influence on the conductor temperature is studied. Both standards give similar results with slight differences due to the different way to calculate the solar radiation and convection. Considering the wind, both standards provide better results for the estimated conductor temperature as the wind speed increases and the angle with the line is closer to 90 ∘ . In addition, if the theoretical radiation is replaced by that measured with the pyranometer, the number of samples with deviations higher than 5 ∘ C is reduced from around 15% to 5%.

  5. EHV/HV Underground Cable Systems for Power Transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    of the transmission system must be re‐thought in order to accommodate the transmission needs for the future. New lines have to be constructed. Transmission lines are usually laid out as overhead lines, which are large structures, i.e. a 400 kV power pylon is 50 meters high. According to public opinion, such power...

  6. Initial application of a geometric QA tool for integrated MV and kV imaging systems on three image guided radiotherapy systems.

    Science.gov (United States)

    Mao, Weihua; Speiser, Michael; Medin, Paul; Papiez, Lech; Solberg, Timothy; Xing, Lei

    2011-05-01

    Several linacs with integrated kilovoltage (kV) imaging have been developed for delivery of image guided radiation therapy (IGRT). High geometric accuracy and coincidence of kV imaging systems and megavoltage (MV) beam delivery are essential for successful image guidance. A geometric QA tool has been adapted for routine QA for evaluating and characterizing the geometric accuracy of kV and MV cone-beam imaging systems. The purpose of this work is to demonstrate the application of methodology to routine QA across three IGRT-dedicated linac platforms. It has been applied to a Varian Trilogy (Varian Medical Systems, Palo Alto, CA), an Elekta SynergyS (Elekta, Stockholm, Sweden), and a Brainlab Vero (Brainlab AG, Feldkirchen, Germany). Both the Trilogy and SynergyS linacs are equipped with a retractable kV x-ray tube and a flat panel detector. The Vero utilizes a rotating, rigid ring structure integrating a MV x-ray head mounted on orthogonal gimbals, an electronic portal imaging device (EPID), two kV x-ray tubes, and two fixed flat panel detectors. This dual kV imaging system provides orthogonal radiographs, CBCT images, and real-time fluoroscopic monitoring. Two QA phantoms were built to suit different field sizes. Projection images of a QA phantom were acquired using MV and kV imaging systems at a series of gantry angles. Software developed for this study was used to analyze the projection images and calculate nine geometric parameters for each projection. The Trilogy was characterized five times over one year, while the SynergyS was characterized four times and the Vero once. Over 6500 individual projections were acquired and analyzed. Quantitative geometric parameters of both MV and kV imaging systems, as well as the isocenter consistency of the imaging systems, were successfully evaluated. A geometric tool has been successfully implemented for calibration and QA of integrated kV and MV across a variety of radiotherapy platforms. X-ray source angle deviations up to

  7. Single-phase system in the voltage class of 15 kV at long distances; Alimentadores monofasicos em redes aereas na classe de 15 kV, para grandes distancias

    Energy Technology Data Exchange (ETDEWEB)

    Sant` Anna, Alzira M [UNESP, Botucatu, SP (Brazil). Faculdade de Ciencias Agronomicas; Simone, Gilio A [UNESP, Bauru, SP (Brazil). Dept. de Engenharia Eletrica

    1999-12-31

    There have always been three philosophies regarding the way how electrical power should be taken to the countrymen. One of them states that the feeding should be single-phase by two conductors, the tri-phase feeding philosophy and the one of the single-phase earth return. This work searched to asses the electrical behaviour of a single-phase by two conductors system, in the tension class of 15 kV, at long distance, as a way of making feasible the implantation of well structured single-phase circuits, that may cause the least disturbance in the tri-phase lines from which they derive. In order to reach the intended goals, simulations with a mathematical simulator of electric circuit were performed, working with the parameters of the lines, of the transformers and of the charges. A bi wired circuit of the distribution was assembled and taken to the same simulator, the one which provided the currents, the tension drop outs, at each point or part of the net. With these data it is possible to: verify the reduction of the torked in the motors axel; the reduction of the tension in the lamps; the behaviour of the net under variable conditions of charge. (author) 3 refs., 6 figs., 7 tabs.

  8. Nanosecond pulsed power generator for a voltage amplitude up to 300 kV and a repetition rate up to 16 Hz for fine disintegration of quartz

    Energy Technology Data Exchange (ETDEWEB)

    Krastelev, E. G., E-mail: ekrastelev@yandex.ru; Sedin, A. A.; Tugushev, V. I. [Russian Academy of Sciences, Joint Institute for High Temperatures (Russian Federation)

    2015-12-15

    A generator of high-power high-voltage nanosecond pulses is intended for electrical discharge disintegration of mineral quartz and other nonconducting minerals. It includes a 320 kV Marx pulsed voltage generator, a high-voltage glycerin-insulated coaxial peaking capacitor, and an output gas spark switch followed by a load, an electric discharge disintegration chamber. The main parameters of the generator are as follows: a voltage pulse amplitude of up to 300 kV, an output impedance of ≈10 Ω, a discharge current amplitude of up to 25 kA for a half-period of 80–90 ns, and a pulse repetition rate of up to 16 Hz.

  9. Nanosecond pulsed power generator for a voltage amplitude up to 300 kV and a repetition rate up to 16 Hz for fine disintegration of quartz

    International Nuclear Information System (INIS)

    Krastelev, E. G.; Sedin, A. A.; Tugushev, V. I.

    2015-01-01

    A generator of high-power high-voltage nanosecond pulses is intended for electrical discharge disintegration of mineral quartz and other nonconducting minerals. It includes a 320 kV Marx pulsed voltage generator, a high-voltage glycerin-insulated coaxial peaking capacitor, and an output gas spark switch followed by a load, an electric discharge disintegration chamber. The main parameters of the generator are as follows: a voltage pulse amplitude of up to 300 kV, an output impedance of ≈10 Ω, a discharge current amplitude of up to 25 kA for a half-period of 80–90 ns, and a pulse repetition rate of up to 16 Hz

  10. Soil scientific supervision of 220/38 kV cable circuits of the power station 'Eemscentrale' in the Dutch province Groningen: Part 2

    International Nuclear Information System (INIS)

    Langevoord, J.; Kraeima, A.F.

    1995-01-01

    Recently, five underground cable circuits were completed at the site of the EPON (an energy utility for the north-eastern part of the Netherlands) title power station, consisting of two 220 kV and two 380 kV connections with a total length of 24 km. In a previous article, attention is paid to theoretical aspects of heat transfer of cables for underground electricity transport, the research method of the soil scientific survey, and the results of the survey for the design of the cable connection, to be made by NKF (cable manufacturer) and for the final execution of the cable design. In this article attention will be paid to soil scientific marginal conditions and soil scientific supervision during the realization. 1 fig., 2 tabs., 2 refs

  11. Protection system for 11kV network using arc noise

    International Nuclear Information System (INIS)

    Burdi, M.K.; Memon, A.S.; Shaikh, S.A.

    2000-01-01

    Extensive research work is being done on protecting devices for 11KV network using arc noise and fault noise frequencies in relay to operate a circuit breaker; The relay works on the principle of detecting fault and extracting voltage signal output from the noise frequencies across filter. The voltage development without amplification, is enough to operate the circuit breaker. Sensitivity of the circuit breaker. In this paper design, operation and application of the relay are described. (author)

  12. 75 FR 9573 - Minnkota Power Cooperative, Inc: Bemidji-Grand Rapids 230kV Transmission Project

    Science.gov (United States)

    2010-03-03

    ... Rapids 230kV Transmission Project AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability... copy of the Draft EIS may be viewed online at the following Web sites: http://www.usda.gov/rus/water..., Longville, MN 56655; Walker Public Library, 207 4th St., Walker, MN 56484; Bovey Public Library--Village...

  13. 75 FR 75170 - Minnkota Power Cooperative, Inc.: Bemidji to Grand Rapids 230 kV Transmission Line Project

    Science.gov (United States)

    2010-12-02

    ... availability of Record of Decision. SUMMARY: The Rural Utilities Service, hereinafter referred to as RUS and/or the Agency, has issued a Record of Decision (ROD) for the Environmental Impact Statement (EIS) for the... financing to construct the 230 kilovolt (kV) transmission line between the Wilton Substation near Bemidji...

  14. METHODICAL APPROACHES TO THE CHOICE OF THE NEW GENERATION OF HIGH-VOLTAGE POWER TRANSMISSION LINE 220 kV OPTIONS

    Directory of Open Access Journals (Sweden)

    POSTOLATI V.M.

    2010-08-01

    Full Text Available The Transmission Power Lines of new generation are described in the article (single- compact, double-circuit compact, double-circuit Controlled Self-compensating High Voltage Transmission Power Lines (CSHVL. Basic principles of creation, design elements and comparative characteristics of the transmission lines of the new generation are described, the advantages of its are showed. Methodical approaches to the choosing of a new generation of transmission lines and facilities management FACTS are formulated. Methodical approaches to the choice of options for transmission lines 220 kV and facilities management are shown.

  15. Simulation of interaction between wind farm and power system

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Hansen, Anca Daniela; Janosi, L.

    2002-01-01

    A dynamic model of the wind farm Hagesholm has been implemented in the dedicated power system simulation program DIgSILENT. The wind farm con- sists of six 2MW NM2000/72 wind turbines from NEG-Micon. The model has been verified using simultaneous powerquality measurements on the 10 kV terminals...

  16. Power supply system for KSTAR neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W., E-mail: franciscocho@nfri.re.kr; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-10-15

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  17. Power supply system for KSTAR neutral beam injector

    International Nuclear Information System (INIS)

    Cho, W.; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-01-01

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  18. Efficient heat recovery: Integrated circuit systems and heat pipes; Gezielte Waermerueckgewinnung: KV-Systeme und Waermerohr

    Energy Technology Data Exchange (ETDEWEB)

    Kaup, C. [Howatherm, Bruecken (Germany)

    1995-09-18

    Integrated circuit systems and heat pipes are both known to be low-efficiency systems, but this shortcoming can be eliminated by constructive measures. (orig.) [Deutsch] Die beiden Verfahren - Kreislaufverbundsystem und das Waermerohr - sind als WRG-Systeme mit geringen Wirkungsgraden bekannt. Doch dieser Nachteil kann durch spezielle Konstruktionsmassnahmen eliminiert werden. (orig.)

  19. Probabilistic determination of operating rules for 6.6 kV power supplies to 900 MW(e) pressurized-water units

    International Nuclear Information System (INIS)

    Blin, A.; Carnino, A.; Boursier, M.; Greppo, J.F.

    1975-01-01

    The 6.6 kV power supplies to the safety systems of the 900 MW PWR units being built by Electricite de France (EDF) are ensured by four redundant sources within or outside the site. Because of this redundancy, non-availability of one or more of the sources does not jeopardize the electricity supply - it merely means that the unit must be shut down deliberately for safety reasons at some time. The proposed method is a probabilistic approach which makes it possible to determine how long the unit can reasonably continue on power in such circumstances. The study described in the paper is based on operating results recorded by EDF for equipment similar to that envisaged for future nuclear power stations and in service in existing ones. The amount of information gathered and the method employed for gathering it permit a realistic assessment of the reliability parameters of the equipment (failure and repair rates). To allow for the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability P 0 of a simultaneous failure of all power sources. Use of this method requires prior conversion of the actual concept to an equivalent concept. The sensitivity of P 0 to the parameters is studied for each case, a reasonable uncertainty range being obtained for P 0 . Common mode failures for external or internal sources are introduced in parametric form so that the parameter value beyond which they can be neglected is determined. On the basis of the results of the study, the authors propose the adoption of a comparative criterion whereby any mode of operation in degraded conditions (one or more sources not available) is permitted provided that the corresponding value of P 0 is always lower than the maximum value attained by it in the reference situation (all sources available). Applying this criterion, one can determine with the help of graphs the

  20. Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system

    International Nuclear Information System (INIS)

    Toennesen, Ole; Daeumling, Manfred; Jensen, Kim H; Kvorning, Svend; Olsen, Soeren K; Traeholt, Chresten; Veje, Erling; Willen, Dag; Oestergaard, Jacob

    2004-01-01

    A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50 000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current of 1157 A. The operation experiences include over-currents of 6 kA due to faults on peripheral lines, commissioning, servicing and failure responses on the cooling system, continuous 24 h, 7 day per week monitoring and performance of the alarm system. The implications of these experiences for the future applications of HTS cable systems are analysed

  1. Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system

    DEFF Research Database (Denmark)

    Tønnesen, Ole; Däumling, Manfred; Jensen, Kim Høj

    2004-01-01

    of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50 000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current......A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim...

  2. Neutral Beam Power System for TPX

    International Nuclear Information System (INIS)

    Ramakrishnan, S.; Bowen, O.N.; O'Conner, T.; Edwards, J.; Fromm, N.; Hatcher, R.; Newman, R.; Rossi, G.; Stevenson, T.; von Halle, A.

    1993-01-01

    The Tokamak Physics Experiment (TPX) will utilize to the maximum extent the existing Tokamak Fusion Test Reactor (TFTR) equipment and facilities. This is particularly true for the TFTR Neutral Beam (NB) system. Most of the NB hardware, plant facilities, auxiliary sub-systems, power systems, service infrastructure, and control systems can be used as is. The major changes in the NB hardware are driven by the new operating duty cycle. The TFTR Neutral Beam was designed for operation of the Sources for 2 seconds every 150 seconds. The TPX requires operation for 1000 seconds every 4500 seconds. During the Conceptual Design Phase of TPX every component of the TFTR NB Electrical Power System was analyzed to verify whether the equipment can meet the new operational requirements with our without modifications. The Power System converts 13.8 kV prime power to controlled pulsed power required at the NB sources. The major equipment involved are circuit breakers, auto and rectifier transformers surge suppression components, power tetrodes, HV Decks, and HVDC power transmission to sources. Thermal models were developed for the power transformers to simulate the new operational requirements. Heat runs were conducted for the power tetrodes to verify capability. Other components were analyzed to verify their thermal limitations. This paper describes the details of the evaluation and redesign of the electrical power system components to meet the TPX operational requirements

  3. Choice of 735 kV transmission economics and system performance

    Energy Technology Data Exchange (ETDEWEB)

    McGillis, D T

    1966-01-01

    The present Hydro Quebec load is 8,000 MW and is expected to be 16,000 MW by the late 1970's and 26,000 MW by the middle of the 1980's. This load is concentrated in the area along the St. Lawrence River between Quebec City and Montreal where most of Quebec's six million people live. Fortunately there is in the Province of Quebec enough hydroelectric potential to meet the increase in load that is expected to develop over the next 15 to 20 years. These new sources are, however, at least 500 miles away from the Montreal-Quebec load area. Though this consideration had some bearing on the planning of the Hydro-Quebec ehv network, the choice of 735 kV transmission for the Manicouagan-Outardes project was based principally on economic studies of alternative transmission facilities for this specific project.

  4. 2KJ/S 1KV, 25HZ PRR capacitor charging power supply with twin phase shifted primary windings to achieve high charge transfer rate and stability

    International Nuclear Information System (INIS)

    Kelkar, Y.; Singh, Y.P.; Thakurta, A.C.

    2013-01-01

    The capacitor charging power supply (CCPS) was developed to charge bank of 150uF energy storage capacitor (15uf , 10 nos in parallel) upto 1kV in 35 ms exhibiting a peak charging power of 2 kJ/s at a repetition rate of 25 pps. A CCPS observes a large change in load variations at the output. Initially the capacitor will act as a short circuit so the topology must be such that it should withstand short circuit condition repetitively. The High Voltage capacitor charging power supply consist of two identical full bridge resonant converters feeding to two primary windings of a transformer with rectified secondary connected to capacitor load. Topology selection is based on the fact that the series resonant converter with switching frequency f s , below 50% of the resonant frequency f r (f s ≤ 0.5 f r ) act as a current source. (author)

  5. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  6. AES Modular Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Modular Power Systems (AMPS) project will demonstrate and infuse modular power electronics, batteries, fuel cells, and autonomous control for exploration...

  7. Transient Tolerant Automated Control System for the LEDA 75kV Injector

    International Nuclear Information System (INIS)

    Thuot, M.E.; Dalesio, L.R.; Harrington, M.; Hodgkins, D.; Kerstiens, D.M.; Stettler, M.W.; Warren, D.S.; Zaugg, T.; Arvin, A.; Bolt, S.; Richards, M.

    1999-01-01

    The Low-Energy Demonstration Accelerator (LEDA) injector is designed to inject 75-keV, 110-mA, proton beams into the LEDA RFQ. The injector operation has been automated to provide long term, high availability operation using the Experimental Physics and Industrial Control System (EPICS). Automated recovery from spark-downs demands reliable spark detection and sequence execution by the injector controller. Reliable computer control in the high-energy transient environment required transient suppression and isolation of hundreds of analog and binary data lines connecting the EPICS computer controller to the injector and it's power supplies and diagnostics. A transient suppression design based on measured and modeled spark transient parameters provides robust injector operation. This paper describes the control system hardware and software design, implementation and operational performance

  8. Stray current induced corrosion in lightning rod cables of 525 kV power lines towers: a case study

    International Nuclear Information System (INIS)

    Wojcicki, F. R.; Negrisoli, M. E. M.; Franco, C. V.

    2003-01-01

    With the growth of several areas in modern society, the necessity to generate and carry electrical energy to big cities has greatly increased. Cables supported by power towers with galvanized steel foundation usually carry energy. As the foundations are underground they may cause high rates of corrosion. These are usually detected by a conventional potential measurement using a Cu/CuSO 4 reference electrode. It is believed that corrosion results from stray currents that flow through the ground to close the loop between neighboring towers. Stray currents originate in the lightning rod cables of the power line towers, induced by the strong electromagnetic and electric fields of the energized power lines. The intensity and direction of those currents were measured, indicating substantial values of both their AC and DC components. The potential of the tower ground system, measured in the perpendicular direction of the main axis of the power line, was plotted as a function of the distance to the tower base. The results clearly indicated the tendency to corrosive attack in the anodic towers as reflected by the slope of the plot, whereas no signs of corrosion could be found in the reverse slope, confirming the visual inspection of the foundation. The profile of the potential plots could be changed providing the electric insulation of the lightning rod cable. (Author) 8 refs

  9. Power systems for the Doublet III 2-MW ECH system

    International Nuclear Information System (INIS)

    Remsen, D.B. Jr.

    1981-10-01

    A system providing 5 second pulses at 60 GHz from ten 200 kW gyrotrons is being prepared for electron cyclotron heating experiments on Doublet III. The power supply for the gyrotron system is a power supply currently under construction by Universal Voltronics Corporation for the Doublet III neutral beam power supply, and is to have the option of reverse polarity (negative) to fill the needs of the system of ten gyrotons operating in parallel. The output of this power supply is 80 kV at 100A for 5 second pulses with good regulation. The output pulse rise and fall times and fault protection response time are all compatible with the gyrotron requirements

  10. Electric power systems

    CERN Document Server

    Weedy, B M; Jenkins, N; Ekanayake, J B; Strbac, G

    2012-01-01

    The definitive textbook for Power Systems students, providing a grounding in essential power system theory while also focusing on practical power engineering applications. Electric Power Systems has been an essential book in power systems engineering for over thirty years. Bringing the content firmly up-to-date whilst still retaining the flavour of Weedy's extremely popular original, this Fifth Edition has been revised by experts Nick Jenkins, Janaka Ekanayake and Goran Strbac. This wide-ranging text still covers all of the fundamental power systems subjects but is now e

  11. Soil scientific survey of 220/38 kV cable circuits of the power station 'Eemscentrale' in the Dutch province Groningen; Theoretical backgrounds, research method and results

    International Nuclear Information System (INIS)

    Langevoord, J.; Van Loon, L.J.M.

    1995-01-01

    Recently, five underground cable circuits were completed at the site of the EPON (an energy utility for the north-eastern part of the Netherlands) title power station, consisting of two 220 kV and two 380 kV connections with a total length of 24 km. Soil scientific in situ investigations and laboratory tests were carried out in advance to collect data, on the basis of which thermal resistivity and critical thermal conditions could be calculated. It was demonstrated by the calculated results that no de-hydrated zones occurred around the cable for design criteria conditions. Optimal cable bed conditions could be achieved, using some of the sand excavated from the trench. In this article, attention will be paid to theoretical aspects of heat transfer of cables for underground electricity transport, the research method of the soil scientific survey, and the results of the survey for the design of the cable connection, to be made by NKF (cable manufacturer) and for the final execution of the cable design. In the second article, to be published in a next issue of this magazine, attention will be paid to soil scientific marginal conditions and soil scientific supervision during the realization. 9 figs., 6 tabs., 9 refs

  12. Estimation of expected short-circuit current levels in and circuit-breaker requirements for the 330 to 750 kV networks of the southern integrated power grid

    Energy Technology Data Exchange (ETDEWEB)

    Krivushkin, L.F.; Gorazeeva, T.F.

    1978-08-01

    Studies were made in order to project the operating levels in the Southern Integrated Power Grid to the year 2000. The short-circuit current levels and, the requirements which circuit breakers will have to meet are estimated. A gradual transition from 330 to 750 kV generation is foreseen, with 330 kV networks remaining only for a purely distribution service. The number of 330 kV line hookups and the number of circuit breakers at nodal points (stations and substations) will not change significantly, they will account for 40% of all circuit breakers installed in 25% of all nodal points. Short-circuit currents are expected to reach the 46 kA level in 750 kV networks and 63 kA (standing wave voltage 1.5 to 2.5 kV/microsecond) in 330 kV networks. These are the ratings of circuit breakers; of the 63 kA ones 150 will be needed by 1980--1990 and 400 by 1990--2000. It will also be eventually worthwhile to install circuit breakers with a 63 kA-750 kV rating.

  13. A field experiment on power line stabilization by SMES system

    International Nuclear Information System (INIS)

    Irie, F.; Takeo, M.; Sato, S.; Katahira, O.; Fukui, F.; Takamatsu, M.

    1992-01-01

    In this paper field experiments on stabilization of a hydro power plant by a SMES system are reported, where a generator having a rating of 60 kW at 3.3kV is connected to a 6.6kV power distribution line. The SMES system is composed of two 30kVA GTO convertors and a superconducting magnet system with an energy of 30kJ at 100A. Experiments of stabilization for the generator fluctuation caused by a sudden insertion of inductors in the line are successfully performed for some control modes. The value of the SMES system to compensate for a short period voltage dip is also confirmed

  14. Características de las fallas en alimentadores de 13,8 kV del sistema soterrado de La Habana;Characteristic of 13,8 kV feeders faults of the Havana underground system

    Directory of Open Access Journals (Sweden)

    Boris Alba - Valle

    2011-06-01

    Full Text Available El sistema soterrado de La Habana enfrenta problemas de continuas fallas en sus alimentadores de 13,8 kV. En este trabajo se determinan las características de estas averías, en el período comprendido entre los años 2007 y 2009, y se proponen algunas medidas objetivas con el fin de contribuir a su disminución. La investigación se basó fundamentalmente en el estudio de la base de datos de los alimentadores de 13,8 kV proporcionada por el departamento técnico de la Unidad Empresarial Básica (UEB Soterrada y en el uso de herramientas estadísticas digitales. Como resultado se pudo constatar que las fallas son más frecuentes en los alimentadores de la subestación de Tallapiedra producto de la humedad en cables y empalmes con aislamiento de PILC (papel impregnado en aceite y con cubierta de plomo, dispuestos por tierra muerta. Finalmente, las medidas propuestas tuvieron un impacto positivo en la disminución de estas fallas, en un período inferior a un año.The Havana underground system has problems of continuous faults in their 13,8 kV feeders. In this article the characteristics of these mishaps in the period of 2007 to 2009 are determined and purpose some objective measurements with the end of contributing to their decrease. The investigation was fundamentally based on the study of the 13,8 kV feeders database proportioned by the technical department of the Underground Basic Managerial Unit (UEB and the use of digital statistical tools. As a result, it was verified that the faults occur with more frequency in the Tallapiedra substation feeders, due to the humidity in cables and connections with PILC isolation (impregnated in oil and lead covered paper, prepared for undergrounding directly in the earth. Finally, the proposed measures had a positive impact in the decrease of these faults, in a period less than to a year.

  15. HVDC transmission preferred to 750 kV ac

    Energy Technology Data Exchange (ETDEWEB)

    1965-06-25

    It is unlikely that there will be a need in Britain for ac transmission voltages above 400 kV. But with the growing load density in the large conurbations with no possibility of local generation, high voltage dc transmission is likely to be most useful. It was concluded that by 1971 the 400 kV supergrid would be nation-wide and 6,200 circuit miles should be in service. With the expansion to accommodate the large new generating stations, the 400 kV supergrid would become an extremely high power distribution network rather than a transmission system. A higher voltage for transmission is outside the rational limit of speculation for a country the size of Britain.

  16. Power system relaying

    CERN Document Server

    Horowitz, Stanley H; Niemira, James K

    2013-01-01

    The previous three editions of Power System Relaying offer comprehensive and accessible coverage of the theory and fundamentals of relaying and have been widely adopted on university and industry courses worldwide. With the third edition, the authors have added new and detailed descriptions of power system phenomena such as stability, system-wide protection concepts and discussion of historic outages. Power System Relaying, 4th Edition continues its role as an outstanding textbook on power system protection for senior and graduate students in the field of electric power engineering and a refer

  17. Shipboard electrical power systems

    CERN Document Server

    Patel, Mukund R

    2011-01-01

    Shipboard Electrical Power Systems addresses new developments in this growing field. Focused on the trend toward electrification to power commercial shipping, naval, and passenger vessels, this book helps new or experienced engineers master cutting-edge methods for power system design, control, protection, and economic use of power. Provides Basic Transferable Skills for Managing Electrical Power on Ships or on LandThis groundbreaking book is the first volume of its kind to illustrate optimization of all aspects of shipboard electrical power systems. Applying author Mukund Patel's rare combina

  18. ANALISIS PENGARUH REKONFIGURASI GROUNDING KABEL POWER 20 kV TERHADAP ERROR RATIO CURRENT TRANSFORMERS PELANGGAN TEGANGAN MENENGAH DI HOTEL GOLDEN TULIP SEMINYAK

    Directory of Open Access Journals (Sweden)

    Kadek Amerta Yasa

    2017-10-01

    Full Text Available Hotel Golden Tulip Seminyak  merupakan pelanggan listrik tegangan menengah yang sangat potensial. Pada penelitian di hotel ini,  kami menemukan bahwa error ratio trafo arus sebelum rekonfigurasi grounding berkisar – 67% dan rugi-rugi daya sebesar - 214.809,00 W pada persentase beban 20%.  Error ratio memengaruhi arus yang terbaca di sisi sekunder trafo dan juga memengaruhi rugi daya.  Upaya yang dilakukan untuk mengurangi nilai error ratio dan rugi daya tersebut yaitu dengan melakukan rekonfigurasi grounding yaitu dengan memindahkan posisi tap grounding kabel power 20 kV masuk kembali melalui sisi primer trafo arus.  Nilai error ratio setelah rekonfigurasi grounding diperoleh berkisar – 0,05% dan  rugi-rugi daya - 20,18 W pada persentase beban 20%.

  19. Rated power factor and excitation system of large turbine generator

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao; Watanabe, Takashi; Banjou, Minoru.

    1979-01-01

    As for the rated power factor of turbine generators for thermal power stations, 90% has been adopted since around 1960. On the other hand, power transmission system has entered 500 kV age, and 1,000 kV transmission is expected in the near future. As for the supply of reactive power from thermal and nuclear turbine generators, the necessity of supplying leading reactive power has rather increased. Now, the operating power factor of thermal and nuclear generators becomes 96 to 100% actually. As for the excess stability of turbine generators owing to the strengthening of transmission system and the adoption of super-high voltage, the demand of strict conditions can be dealt with by the adoption of super-fast response excitation system of thyristor shunt winding self exciting type. The adoption of the turbine generators with 90 to 95% power factor and the adoption of the thyristor shunt winding self exciting system were examined and evaluated. The rated power factor of generators, excitation system and economy of adopting these systems are explained. When the power factor of generators is increased from 0.9 to 0.95, about 6% of saving can be obtained in the installation cost. When the thyristor shunt winding self excitation is adopted, it is about 10% more economical than AC excitation. (Kako, I.)

  20. Design of EAST LHCD high power supply feedback control system based on PLC

    International Nuclear Information System (INIS)

    Hu Huaichuan; Shan Jiafang

    2009-01-01

    Design of EAST LHCD -35kV/5.6MW high power supply feedback control system based on PLC is described. Industrial computer and PLC are used to control high power supply in the system. PID arithmetic is adopted to achieve the feedback control of voltage of high power supply. Operating system is base on real-time operating system of QNX. Good controlling properties and reliable protective properties of the feedback control system are proved by the experiment results. (authors)

  1. Power system health analysis

    International Nuclear Information System (INIS)

    Billinton, Roy; Fotuhi-Firuzabad, Mahmud; Aboreshaid, Saleh

    1997-01-01

    This paper presents a technique which combines both probabilistic indices and deterministic criteria to reflect the well-being of a power system. This technique permits power system planners, engineers and operators to maximize the probability of healthy operation as well as minimizing the probability of risky operation. The concept of system well-being is illustrated in this paper by application to the areas of operating reserve assessment and composite power system security evaluation

  2. Stray current induced corrosion in lightning rod cables of 525 kV power lines towers: a case study

    Directory of Open Access Journals (Sweden)

    Wojcicki, F. R.

    2003-12-01

    Full Text Available With the growth of several areas in modem society, the necessity to generate and carry electrical energy to big cities has greatly increased. Cables supported by power towers with galvanized steel foundation usually carry energy. As the foundations are underground they may cause high rates of corrosion. These are usually detected by a conventional potential measurement using a Cu/CuSO4 reference electrode. It is believed that corrosion results from stray currents that flow through the ground to close the loop between neighboring towers. Stray currents originate in the lightning rod cables of the power line towers, induced by the strong electromagnetic and electric fields of the energized power lines. The intensity and direction of those currents were measured, indicating substantial values of both their AC and DC components. The potential of the tower ground system, measured in the perpendicular direction of the main axis of the power line, was plotted as a function of the distance to the tower base. The results clearly indicated the tendency to corrosive attack in the anodic towers as reflected by the slope of the plot, whereas no signs of corrosion could be found in the reverse slope, confirming the visual inspection of the foundation. The profile of the potential plots could be changed providing the electric insulation of the lightning rod cable.

    Con el crecimiento de varias áreas en la sociedad moderna, la necesidad de generar y conducir la energía eléctrica a las grandes ciudades ha aumentado enormemente. La energía, normalmente, se transporta por cables sostenidos por torres de energía con base de acero galvanizado. Cuando las bases son subterráneas, pueden ocasionar altas tasas de corrosión. Estas, normalmente, se detectan por la medida convencional del potencial empleando un electrodo de referencia de Cu/CuSO4. Se cree que la corrosión es el resultado de corrientes perdidas que fluyen a través de la

  3. Development of the power system for accelerator

    International Nuclear Information System (INIS)

    Kwon, Hyeokjung; Kim, D. I.; Kim, H. S.; Park, B. S.; Seol, K. T.; Yun, S. P.; Song, Y. G.; Jang, J. H.; Cho, Y. S.

    2013-02-01

    The 100-MeV proton linac needs 4 modulators whose specification is as follows, -115kV, 55A, and 9%. The development of the modulators were successfully finished and installed at Gyeongju site of KAERI. One of them was used and successfully tested in the 20-MeV linac operation at Daejeon site. The klystron is used to supply the high power RF into the accelerating structure. There are 2 klystrons for 20-MeV part of the linac and 7 klystrons from 20-MeV to 100-MeV region. The maximum voltage is ?105kV, the peak power is 1.6 MW, and the duty is 9%. All of the 7 klystrons have been fabricated, tested and installed. The high power RF system includes circulators, dummy lodes, RF windows, and wave-guides. The development of the high power RF components was finished and they were installed at the Gyeongju site. The 11 sets of RCCS (resonant control cooling system) will be used to control the cooling water temperature inside the accelerating structure. The temperature range of the cooling water covers between 21 .deg. C and 33 .deg. C with the 0.1 .deg. C control. All RCCSs were installed in the klystron gallery. Purposes of the 20-MeV linac operation at Daejeon site of KAERI (2007∼2011) are to supply proton beams to user, to porve the accelerator performance, to test the developed components including LLRF, diagnostics, and control system, and to measure the proton beam properties. During the period, the total number of samples reaches to 1,603 and the average machine availability becomes 96.2%. The 20-MeV linac was disassembled, moved and installed at Gyeongju site after finishing the test operation

  4. Power System Analysis

    Science.gov (United States)

    Taniguchi, Haruhito

    Electric power generation that relies on various sources as the primary sources of energy is expected to bring down CO2 emissions levels to support the overall strategy to curb global warming. Accordingly, utilities are moving towards integrating more renewable sources for generation, mostly dispersed, and adopting Smart Grid Technologies for system control. In order to construct, operate, and maintain power systems stably and economically in such background, thorough understanding about the characteristics of power systems and their components is essential. This paper presents modeling and simulation techniques available for the analysis of critical aspects such as thermal capacity, stability, voltage stability, and frequency dynamics, vital for the stable operation of power systems.

  5. Optimization in power systems

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Geraldo R.M. da [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia

    1994-12-31

    This paper discusses, partially, the advantages and the disadvantages of the optimal power flow. It shows some of the difficulties of implementation and proposes solutions. An analysis is made comparing the power flow, BIGPOWER/CESP, and the optimal power flow, FPO/SEL, developed by the author, when applied to the CEPEL-ELETRONORTE and CESP systems. (author) 8 refs., 5 tabs.

  6. Development and use of 60 kV, and 150 kV floating deck modulators for high voltage protection of multi-megawatt ion beam accelerators

    International Nuclear Information System (INIS)

    Barber, G.C.; Ponte, N.S.; Schilling, G.

    1977-01-01

    Extraction currents of 60 A at 40 kV have been produced by utilizing a 60 kV floating deck modulator interfaced to a high voltage power supply. The modulator is operated in a series mode to repetitively pulse power to the ion beam accelerator. Current monitoring and other protective circuits provide interrupt commands to the series switch tube when faults occur. The constant current characteristics of the water cooled tetrode and the rapid response of the protective circuits effectively limit the fault energy to the ion source. Three of the 60 kV decks have been modified and stacked in a series configuration to supply 150 kV, 50 A pulses. This system supplies power for development of higher-energy multi-grid sources. In this system attention has been focused on forced voltage sharing of the three decks and on protective circuits for fault conditions. All control signal processing and conditioning is performed at ground level. Fiber optic links are used to interface with the high potential associated with the floating decks. A shunt modulator incorporated with this system provides regulation of the voltage to the ion source gradient grid. Future modulator development includes a system to deliver 100 A at 80 kV

  7. First operation experiences from a 30 kV 104 MVA HTS power cable installed in a utility substation

    DEFF Research Database (Denmark)

    Willen, D.; Hansen, F.; Daumling, M.

    2002-01-01

    realistic conditions in the substation of Amager (AMK). Approximately 50 000 private and business customers are supplied from this cable. The load can be adjusted from 20% to 100% of the power supplied and the number of branches connected can be altered. This and other early HTS power installations...... are expected to act as ice-breakers for the HTS technology...

  8. Load shedding and emergency load sequencing system at Sizewell B power station

    International Nuclear Information System (INIS)

    Bowcock, S.; Miller, D.

    1992-01-01

    Sizewell B Nuclear Power Station has a main electrical system that connects together the main turbo-generators, generating at 23.5kV, the 400kV grid and the auxiliary equipment required to operate the station. A separate essential electrical system fed from the main electrical system, supplies all the auxiliaries required to shut-down the nuclear reactor and maintain it in a safe shut-down condition. For safety reasons four similar independent essential electrical systems are provided, each headed by a 3.3kV switchboard and a stand-by 8MW diesel generator. Feeds from the 3.3kV switchboards in turn supply the essential 3.3kV drives and transformer fed 415V essential switchboards. The function of the Load Shedding and Emergency Load Sequencing (LSELS) System is to monitor the condition of the 3.3kV incoming supply from the main electrical system to each essential 3.3kV switchboard and initiate its replacement, with the supply from the associated diesel generator, if it is outside set parameters. In order to achieve this transfer the essential electrical system load must be reduced to a level which the diesel can accommodate as a standing load and then allow the sequenced reconnection of required loads so as not to overload the diesel. The LSELS equipment is categorised as Safety Category 1E and has a significant importance to the safe operation of the power station. Therefore the design of the system must be highly reliable and the purpose of this paper is to detail the design approach used to ensure that a high system reliability is achieved. (Author)

  9. THE METHOD OF SELECTION OF THE SETPOINT HIGH SPEED FEEDER SWITCH OF 3,3KV DC WITH MICROPROCESSOR-BASED PROTECTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    P. Ye. Mykhalichenko

    2009-10-01

    Full Text Available In the article a new procedure of choice of minimum current jump for action of fast-acting switches of 3.3 kV DC traction substations intended for the use in the microprocessor protection system of feeders is described. This procedure is more perfect than existing one on the current increment and uses the results of mathematical simulation of the traction electric supply system.

  10. Reducing the Risk of Damage to Power Transformers of 110 kV and Above Accompanying Internal Short Circuits

    Energy Technology Data Exchange (ETDEWEB)

    L’vova, M. M. [JSC “R& D Center at Federal Grid Company of the Unified Power System” (Russian Federation); L’vov, S. Yu. [Presselektro LLC (Russian Federation); Komarov, V. B. [IPCE RAS (Russian Federation); Lyut’ko, E. O. [JSC “R& D Center at Federal Grid Company of the Unified Power System” (Russian Federation); Vdoviko, V. P. [EMA Ltd. (Russian Federation); Demchenko, V. V. [JSC “Boguchanskaya HPP” (Russian Federation); Belyaev, S. G. [PKF Konif Ltd. (Russian Federation); Savel’ev, V. A. [Ivanovo State Power University (Russian Federation); L’vov, M. Yu., E-mail: timashova@nte-power.ru; L’vov, Yu. N. [JSC “R& D Center at Federal Grid Company of the Unified Power System” (Russian Federation)

    2015-03-15

    Methods of increasing the operating reliability of power transformers, autotransformers and shunting reactors in order to reduce the risk of damage, which accompany internal short circuits and equipment fires and explosions, are considered.

  11. Harmonics in transmission power systems

    DEFF Research Database (Denmark)

    Wiechowski, Wojciech Tomasz

    . The comparison shows that results obtained used both types of the cores are the same, so it is concluded that both cores can be used for harmonic measurements. Low-inductance resistors are introduced in the secondary circuits, in series with the metering and protective relaying. On those resistors, the harmonic......Some time ago, Energinet.dk, the Transmission System Operator of the 150 kV and 400 kV transmission network in Denmark, had experienced operational malfunctions of some of the measuring and protection equipment. Also an overloading of a harmonic filter has been reported, and therefore, a need...... end only so the ground is not used as a return path. A way to reduce the capacitive coupling is to provide shielding. Harmonic currents are measured using the conventional inductive voltage transformers. Both protective and metering cores were compared if they could be used for harmonic measurements...

  12. Proposal for the Award of a Contract for the Supply of 18kV Power Transformers Rated 464 kVA to 2 MVA

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract for the supply of thirty-five 18 kV cast-resin rectifier power transformers rated 464 kVA to 2 MVA and 26 protective enclosures. Following a market survey (MS-2920/SL/LHC) carried out among 56 firms in sixteen Member States, a call for tenders (IT-3007/SL/LHC) was sent on 12 August 2002 to eight firms in five Member States. By the closing date, CERN had received three tenders from three firms in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with TRASFOR (CH), the lowest bidder, for the supply of 35 power transformers rated 464 kVA to 2 MVA and 26 protective enclosures for a total amount of 1 398 500 Swiss francs, not subject to revision, with an option for three additional transformers and protective enclosures, for an additional amount of 107 650 Swiss francs, subject to revision for inflation from 1 January 2005, bringing the total amount to 1 506 150 Swiss francs subject to revision for inflation from 1 January...

  13. Performance of the 10kV, 100-kA pulsed-power modules for the FRX-C magnetic compression experiment

    International Nuclear Information System (INIS)

    Rej, D.J.; Waganaar, W.J.

    1989-01-01

    In this paper, we present detailed performance data collected from over a year's operation of the 25 and 50-kJoule pulsed-power capacitor-bank modules developed for the Los Alamos magnetic fusion facility FRX-C. These modules supply the 5-MA magnet current needed for the compressional heating of compact toroid plasmoids. To date, 54 modules have been built and successfully tested at their full design rating: 100-kA peak output current at 10-kV charge, τ 1/4 = 60 μs (25-kJ module), or 110 μs (50-kJ module), crowbar L/R ≤ 1 ms. Modules are compact, cost about $5000 each, and though designed for 25 or 50 kJ, they can be easily modified for other pulsed-power applications. Energy is stored in 25-kJ capacitors. Start and crowbar switching is performed with a pair of water-cooled, size-D ignitrons. As an alternative to an ignitron, crowbar switching by solid-state rectifiers has been successfully demonstrated. Current is conducted between components and to the load by parallel-plate transmission lines and by a parallel array of commercially-available coaxial cable. 4 refs., 8 figs

  14. Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems

    DEFF Research Database (Denmark)

    Sztykiel, Michal; Bak, Claus Leth; Dollerup, Sebastian

    2011-01-01

    Based on the analysis of a specific relay model and an HVAC (High Voltage Alternating Current) cable system, a detailed approach to EMTDC/PSCAD modelling of protective relays is presented. Such approach allows to create complex and accurate relay models derived from the original algorithms. Relay...... models can be applied with various systems, allowing to obtain the most optimal configuration of the protective relaying. The present paper describes modelling methodology on the basis of Siemens SIPROTEC 4 7SD522/610. Relay model was verified experimentally with its real equivalent by both EMTP......-simulated and real world generated current signals connected to the relay....

  15. Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems

    DEFF Research Database (Denmark)

    Sztykiel, Michal; Bak, Claus Leth; Wiechowski, Wojciech

    2010-01-01

    Based on the analysis of a specific relay model and an HVAC (High Voltage Alternating Current) cable system, a new approach to EMTDC/PSCAD modelling of protective relays is presented. Such approach allows to create complex and accurate relay models derived from the original algorithms. Relay models...... can be applied with various systems, allowing to obtain the most optimal configuration of the protective relaying. The present paper describes modelling methodology on the basis of Siemens SIPROTEC 4 7SD522/610. Relay model was verified experimentally with its real equivalent by both EMTP......-simulated and real world generated current signals connected to the relay....

  16. Functional properties of human neuronal Kv11 channels

    DEFF Research Database (Denmark)

    Einarsen, Karoline; Calloe, Kirstine; Grunnet, Morten

    2009-01-01

    Kv11 potassium channels are important for regulation of the membrane potential. Kv11.2 and Kv11.3 are primarily found in the nervous system, where they most likely are involved in the regulation of neuronal excitability. Two isoforms of human Kv11.2 have been published so far. Here, we present...... current characteristics of the isoforms presented in this work may contribute to the regulation of neuronal excitability....

  17. Reduction of parasitic capacitance in 10 kV SiC MOSFET power modules using 3D FEM

    DEFF Research Database (Denmark)

    Jørgensen, Asger Bjørn; Christensen, Nicklas; Dalal, Dipen Narendrabhai

    2017-01-01

    The benefits of emerging wide-band gap semiconductors can only be utilized if the semiconductor is properly packaged. Capacitive coupling in the package causes electromagnetic interference during high dv/dt switching. This paper investigates the current flowing in the parasitic capacitance between...... the output node and the grounded heat sink for a custom silicon carbide power module. A circuit model of the capacitive coupling path is presented, using parasitic capacitances extracted from ANSYS Q3D. Simulated values are compared with experimental results. A new iteration of the silicon carbide power...

  18. Personal power systems

    Energy Technology Data Exchange (ETDEWEB)

    Dunn-Rankin, Derek; Leal, Elisangela Martins; Walther, David C. [Mechanical and Aerospace Engineering Department, University of California, Irvine, CA 92697 (United States)

    2005-07-01

    The lack of compact, efficient, human compatible, lightweight power sources impedes the realization of machine-enhanced human endeavor. Electronic and communication devices, as well as mobile robotic devices, need new power sources that will allow them to operate autonomously for periods of hours. In this work, a personal power system implies an application of interest to an individual person. The human-compatible gravimetric energy density spans the range from 500 to 5000Wh/kg, with gravimetric power density requirements from 10 to 1000W/kg. These requirements are the primary goals for the systems presented here. The review examines the interesting and promising concepts in electrochemical, thermochemical, and biochemical approaches to small-scale power, as well as their technological and physical challenges and limitations. Often it is the limitations that dominate, so that while the technology to create personal autonomy for communications, information processing and mobility has accelerated, similar breakthroughs for the systems powering these devices have not yet occurred. Fuel cells, model airplane engines, and hummingbird metabolism, are three promising examples, respectively, of electrochemical, thermochemical, and biochemical power production strategies that are close to achieving personal power systems' power demands. Fuel cells show great promise as an energy source when relatively low power density is demanded, but they cannot yet deliver high peak powers nor respond quickly to variable loads. Current small-scale engines, while achieving extraordinary power densities, are too inefficient to achieve the energy density needed for long-duration autonomous operation. Metabolic processes of flying insects and hummingbirds are remarkable biological energy converters, but duplicating, accelerating, and harnessing such power for mobility applications is virtually unexplored. These challenges are significant, and they provide a fertile environment for

  19. SU-G-JeP3-06: Lower KV Image Dose Are Expected From a Limited-Angle Intra-Fractional Verification (LIVE) System for SBRT Treatments

    Energy Technology Data Exchange (ETDEWEB)

    Ding, G [Vanderbilt University Nashville, TN (United States); Yin, F; Ren, L [Duke University Medical Center, Durham, NC (United States)

    2016-06-15

    Purpose: In order to track the tumor movement for patient positioning verification during arc treatment delivery or in between 3D/IMRT beams for stereotactic body radiation therapy (SBRT), the limited-angle kV projections acquisition simultaneously during arc treatment delivery or in-between static treatment beams as the gantry moves to the next beam angle was proposed. The purpose of this study is to estimate additional imaging dose resulting from multiple tomosynthesis acquisitions in-between static treatment beams and to compare with that of a conventional kV-CBCT acquisition. Methods: kV imaging system integrated into Varian TrueBeam accelerators was modeled using EGSnrc Monte Carlo user code, BEAMnrc and DOSXYZnrc code was used in dose calculations. The simulated realistic kV beams from the Varian TrueBeam OBI 1.5 system were used to calculate dose to patient based on CT images. Organ doses were analyzed using DVHs. The imaging dose to patient resulting from realistic multiple tomosynthesis acquisitions with each 25–30 degree kV source rotation between 6 treatment beam gantry angles was studied. Results: For a typical lung SBRT treatment delivery much lower (20–50%) kV imaging doses from the sum of realistic six tomosynthesis acquisitions with each 25–30 degree x-ray source rotation between six treatment beam gantry angles were observed compared to that from a single CBCT image acquisition. Conclusion: This work indicates that the kV imaging in this proposed Limited-angle Intra-fractional Verification (LIVE) System for SBRT Treatments has a negligible imaging dose increase. It is worth to note that the MV imaging dose caused by MV projection acquisition in-between static beams in LIVE can be minimized by restricting the imaging to the target region and reducing the number of projections acquired. For arc treatments, MV imaging acquisition in LIVE does not add additional imaging dose as the MV images are acquired from treatment beams directly during the

  20. Improvement the Capacity of Cockcroft-Walton High Voltage Source from 300 kV/20 mA to 500 kV/20 mA for Accelerating Voltage of Electron Beam Machine

    International Nuclear Information System (INIS)

    Suprapto; Djasiman

    2002-01-01

    The improvement capacity of Cockcroft-Walton high voltage source from 300 kV/20 mA to 500 kV/mA has been carrying out. To improve the capacity of high voltage source was done by means of increasing the stage number of voltage multiplier from 11 to 18 and its output voltage measuring resistance. Each stage of voltage multiplier consists of 2 capacitors and 2 circuits of high voltage diode. This voltage multiplier is constructed using main components of high voltage capacitor and high voltage diode each of 0.22 μF/50 kV and UF 5408 respectively. To avoid stray discharge and corona it was provided with high voltage electrode and corona ring. The test result indicated that the output voltage obtained from 16 stages was 350 kV according to operating condition of 25 MΩ resistive load and first stage voltage of 28.5 kV with oscillator frequency of 24 Hz. That condition requires anode voltage and current of 5.5 kV and 2.5 A respectively. The no load test for 16 stages indicates 400 kV of output voltage and 28.5 kV first stage voltage. Efficiency of high voltage source was 48 % at 6.75 kW of output power. The expected test of 500 kV with 18 stages of voltage multiplier can not be carried out because of some restrictive of loading system. From the test result can be predicted that the output voltage of 500 kV with 18 stages of voltage multiplier requires 31.2 kV of first stage voltage. Then the expected high voltage source of Cockcroft-Walton is capable as accelerating voltage source for Electron Beam Machine with energy of 500 kV. (author)

  1. Electron-optical system of 200 kV gun for the VEPP-5 preinjector

    International Nuclear Information System (INIS)

    Akimov, V.E.; Kazarezov, I.V.; Tiunov, M.A.

    2004-01-01

    The electron gun with a new electron-optical system to match project parameters of the VEPP-5 preinjector is described. The gun produces the current with 10 A amplitude, pulse duration 2...3 ns at half-height and electron energy 200 keV. The gun has a dispenser cathode 20 mm in diameter and 100 mm spherical radius. The current control is performed by means of molybdenum equipotential grid with the cell size 0.4 centre dot 0.4 mm and optical transparency of about 0.68. The experimental results obtained are in good agreement with project parameters

  2. 600 kV modulator design for the SLAC Next Linear Collider Test Accelerator

    International Nuclear Information System (INIS)

    Harris, K.; de Lamare, J.; Nesterov, V.; Cassel, R.

    1992-07-01

    Preliminary design for the SLAC Next Linear Collider Test Accelerator (NLCTA) requires a pulse power source to produce a 600 kV, 600 A, 1.4 μs, 0.1% flat top pulse with rise and fall times of approximately 100 ns to power an X-Band klystron with a microperveance of 1.25 at ∼ 100 MW peak RF power. The design goals for the modulator, including those previously listed, are peak modulator pulse power of 340 MW operating at 120 Hz. A three-stage darlington pulse-forming network, which produces a >100 kV, 1.4 μs pulse, is coupled to the klystron load through a 6:1 pulse transformer. Careful consideration of the transformer leakage inductance, klystron capacitance, system layout, and component choice is necessary to produce the very fast rise and fall times at 600 kV operating continuously at 120 Hz

  3. Stray current induced corrosion in lightning rod cables of 525 kV power lines towers: a case study

    OpenAIRE

    Wojcicki, F. R.; Negrisoli, M. E. M.; Franco, C. V.

    2003-01-01

    With the growth of several areas in modem society, the necessity to generate and carry electrical energy to big cities has greatly increased. Cables supported by power towers with galvanized steel foundation usually carry energy. As the foundations are underground they may cause high rates of corrosion. These are usually detected by a conventional potential measurement using a Cu/CuSO4 reference electrode. It is believed that corrosion results from stray currents that f...

  4. Nuclear power system

    International Nuclear Information System (INIS)

    Yampolsky, J.S.; Cavallaro, L.; Paulovich, K.F.; Schleicher, R.W.

    1989-01-01

    This patent describes an inherently safe modular nuclear power system for producing electrical power at acceptable efficiency levels using working fluids at relatively low temperatures and pressures. The system comprising: a reactor module for heating a first fluid; a heat exchanger module for transferring heat from the first fluid to a second fluid; a first piping system effecting flow of the first fluid in a first fluid circuit successively through the reactor module and the heat exchanger module; a power conversion module comprising a turbogenerator driven by the second fluid, and means for cooling the second fluid upon emergence thereof from the turbogenerator; a second piping system comprising means for effecting flow of the second fluid in a second fluid circuit successively through the heat exchanger module and the power conversion module; and a plurality of pits for receiving the modules

  5. NSTX Electrical Power Systems

    International Nuclear Information System (INIS)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems

  6. Autonomous power networks based power system

    International Nuclear Information System (INIS)

    Jokic, A.; Van den Bosch, P.P.J.

    2006-01-01

    This paper presented the concept of autonomous networks to cope with this increased complexity in power systems while enhancing market-based operation. The operation of future power systems will be more challenging and demanding than present systems because of increased uncertainties, less inertia in the system, replacement of centralized coordinating activities by decentralized parties and the reliance on dynamic markets for both power balancing and system reliability. An autonomous network includes the aggregation of networked producers and consumers in a relatively small area with respect to the overall system. The operation of an autonomous network is coordinated and controlled with one central unit acting as an interface between internal producers/consumers and the rest of the power system. In this study, the power balance problem and system reliability through provision of ancillary services was formulated as an optimization problem for the overall autonomous networks based power system. This paper described the simulation of an optimal autonomous network dispatching in day ahead markets, based on predicted spot prices for real power, and two ancillary services. It was concluded that large changes occur in a power systems structure and operation, most of them adding to the uncertainty and complexity of the system. The introduced concept of an autonomous power network-based power system was shown to be a realistic and consistent approach to formulate and operate a market-based dispatch of both power and ancillary services. 9 refs., 4 figs

  7. Mobile nuclear power systems

    International Nuclear Information System (INIS)

    Andersson, B.

    1988-11-01

    This report is meant to present a general survey of the mobile nuclear power systems and not a detailed review of their technical accomplishments. It is based in published material mainly up to 1987. Mobile nuclear power systems are of two fundamentally different kinds: nuclear reactors and isotopic generators. In the reactors the energy comes from nuclear fission and in the isotopic generators from the radioactive decay of suitable isotopes. The reactors are primarily used as power sourves on board nuclear submarines and other warships but have also been used in the space and in remote places. Their thermal power has ranged from 30 kWth (in a satellite) to 175 MWth (on board an aircraft carrier). Isotopic generators are suitable only for small power demands and have been used on board satellites and spaceprobes, automatic weatherstations, lighthouses and marine installations for navigation and observation. (author)

  8. Investigation of 35-110 kV line and equipment exterior insulation and oil-filled power transformers under high-mountain conditions

    Energy Technology Data Exchange (ETDEWEB)

    Karapetyan, M.M.; Sanagyan, R.T.

    1980-01-01

    Flashover characteristics have been obtained for 35-110 kV external insulation at heights of up to 2000 m above sea level. The utilization of 35-110 kV equipment for heights of up to 2000 m above sea level is recommended. The dependence of the increase in flashover voltage in rain with increasing resistivity and the tendency toward an increase in the latter with increasing height above sea level are examined.

  9. Voltage Analysis Improvement of 150 kV Transmission Subsystem Using Static Synchronous Compensator (STATCOM)

    Science.gov (United States)

    Akbar, P. A.; Hakim, D. L.; Sucita, T.

    2018-02-01

    In this research, testing improvements to the distribution voltage electricity at 150 kV transmission subsystem Bandung Selatan and New Ujungberung using Flexible AC Transmission System (FACTS) technology. One of them is by doing the control of active and reactive power through the power electronics equipment Static Synchronous Compensator (STATCOM). The subsystem is tested because it has a voltage profile are relatively less well when based on the IEEE / ANSI C.84.1 (142.5 - 157.5 kV). This study was conducted by analyzing the Newton-Raphson power flow on the simulator DigSilent Power Factory 15 to determine the profile of the voltage (V) on the system. Bus which has the lowest voltage to be a reference in the installation of STATCOM. From this research is known that the voltage on the conditions of the existing bus 28, as many as 21-23 still below standard buses (142.5 kV), after the installation is done using STATCOM, voltage on the buses improved by increasing the number of tracks that follow the standard / is in the range 142.5 kV -157.5 kV as many as 23-27 buses or 78.6% - 96%, with the optimum mounting on a bus Rancaekek STATCOM II with a capacity of 300 MVA.

  10. The Effect of Phase-to-earth Faults on the Operating Conditions of a Separated 110 kV Grid Normally Operated with Effectively Earthed Neutral, and Temporarily Supplied from a Compensated 110 kV Grid

    Directory of Open Access Journals (Sweden)

    Wilhelm Rojewski

    2015-06-01

    Full Text Available The paper discusses the interoperability of the German compensated 110 kV grid and the Polish effectively earthed 110 kV grid. It is assumed that an area of one grid, separated from its power system, will be temporarily supplied from the other grid in its normal regime. Reference is made to the risks associated with phase-to-earth faults in grids so interconnected. Particular attention is paid to the working conditions of surge arresters and voltage transformers in the Polish 110 kV grid deprived of its neutral earthing when supplied from the German grid.

  11. Development of PSpice modeling platform for 10 kV/100 A SiC MOSFET power module

    DEFF Research Database (Denmark)

    Martins, Joäo Pedro Rodrigues; Nawaz, Muhammad; Ilves, Kalle

    2017-01-01

    was implemented based on the already established McNutt Hefner model originally developed for discrete single-die based SiC-MOSFETs. The proposed model has been verified both with static and dynamic experimental data and at different temperatures. Moreover, the energy loss assessment has been performed...... for a variety of operating parameters (e.g., stray inductance, gate resistance), different load current and supply voltages. The model was also verified with parallel connection of several power modules in order to predict the current unbalance as a result of various parasitic elements in the test circuit....... The developed model has been further extended to study the electro-thermal behaviour under short circuit with accurate predictability, and validated with the experimental data. Finally, the operational robustness of the model was judged by simulating an arbitrary Buck, and Boost converter where the converter...

  12. Middle Eastern power systems

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Middle Eastern Power systems have evolved independently of each other over many decades. The region covers a wide geographical area of over 4 million square kilometers with an estimated population in 1990 of over 120 million people. This paper discusses the present status and future power system developments in the Middle East with emphasis on the Mashrequ Arab Countries (MAC). MAC consists of Egypt, Iraq, Jordan, Lebanon, Syria, Yemen, and the six Gulf Cooperation Council (GCC) countries, namely, Bahrain, Kuwait, Qatar, Saudi Arabia, Oman, and the United Arab Emirates (UAE). Interconnections within MAC and possible extensions to Turkey, Europe, and Central Africa are discussed. A common characteristic of the MAC power systems is that they are all operated by government or semi-government bodies. The energy resources in the region are varied. Countries such as Iraq, Egypt, and Syria have significant hydro power resources. On the other hand, the GCC countries and Iraq have abundant fossil fuel reserves

  13. Solar Powered Refrigeration System

    Science.gov (United States)

    Ewert, Michael K. (Inventor); Bergeron, David J., III (Inventor)

    2002-01-01

    A solar powered vapor compression refrigeration system is made practicable with thermal storage and novel control techniques. In one embodiment, the refrigeration system includes a photovoltaic panel, a variable speed compressor, an insulated enclosure, and a thermal reservoir. The photovoltaic (PV) panel converts sunlight into DC (direct current) electrical power. The DC electrical power drives a compressor that circulates refrigerant through a vapor compression refrigeration loop to extract heat from the insulated enclosure. The thermal reservoir is situated inside the insulated enclosure and includes a phase change material. As heat is extracted from the insulated enclosure, the phase change material is frozen, and thereafter is able to act as a heat sink to maintain the temperature of the insulated enclosure in the absence of sunlight. The conversion of solar power into stored thermal energy is optimized by a compressor control method that effectively maximizes the compressor's usage of available energy. A capacitor is provided to smooth the power voltage and to provide additional current during compressor start-up. A controller monitors the rate of change of the smoothed power voltage to determine if the compressor is operating below or above the available power maximum, and adjusts the compressor speed accordingly. In this manner, the compressor operation is adjusted to convert substantially all available solar power into stored thermal energy.

  14. Power supply system for negative ion source at IPR

    Science.gov (United States)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-02-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the

  15. Power supply system for negative ion source at IPR

    International Nuclear Information System (INIS)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K G; Soni, Jignesh; Bandyopadhyay, M; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-01-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ∼5 x 10 12 cm -3 , from which ∼ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (∼15 to 35kV), and high current (∼ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (∼50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (∼ 50kV) isolated from the system. The paper shall

  16. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2009-01-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, has routinely demonstrated gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This final report summarizes the results of the technology development work conducted at the PSDF through January 31, 2009. Twenty-one major gasification test campaigns were completed, for a total of more than 11,000 hours of gasification operation. This operational experience has led to significant advancements in gasification technologies.

  17. STUDY ON PERFORMANCE OF 21M 132kV TRANSMISSION TOWER WITH MEDIUM WIND INTENSITY

    OpenAIRE

    V. LAKSHMI; A. RAJAGOPALA RAO

    2012-01-01

    Electric Power is today playing an increasingly important role in the life of the community. In the electric power system the production and transmission of power are two predominant factors. For the purpose of transmission of electricity towers are the main medium with some wires at required distances and altitudes. The remotehydroelectric power plants have given rise to the need for extra high voltage. Prior to 1950, 150 kV electric transmission lines were considered and still higher voltag...

  18. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  19. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  20. Wind power in modern power systems

    DEFF Research Database (Denmark)

    Chen, Zhe

    2013-01-01

    In recent years, wind power is experiencing a rapid growth, and large-scale wind turbines/wind farms have been developed and connected to power systems. However, the traditional power system generation units are centralized located synchronous generators with different characteristics compared...... with wind turbines. This paper presents an overview of the issues about integrating large-scale wind power plants into modern power systems. Firstly, grid codes are introduced. Then, the main technical problems and challenges are presented. Finally, some possible technical solutions are discussed....

  1. Optimum voltage of auxiliary systems for thermal and nuclear power plants

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao; Segawa, Motomichi

    1979-01-01

    In the power plants in Japan, their unit power output has been greatly enhanced since the introduction of new powerful thermal power plants from 1950's to 1960's. In both thermal and nuclear power plants, 1,000 MW machines have been already in operation. The increase of unit power output results in the increase of in-plant load capacity. Of these the voltage adopted for in-plant low voltage systems is now mainly 440 V at load terminals, and the voltage for in-plant high voltage systems has been changing to 6 kV level via 3 kV and 4 kV levels. As plant capacity increases, the load of low voltage systems significantly increases, and it is required to raise the voltage of 400 V level. By the way, the low voltage in AC is specified to be not higher than 600 V. This makes the change within the above range comparatively easy. Considering these conditions, it is recommended to change the voltage for low voltage systems to 575 V at power source terminals and 550 V at load terminals. Some merits in constructing power systems and in economy by raising the voltage were examined. Though demerits are also found, they are only about 15% of total merits. The most advantageous point in raising the voltage is to be capable of increasing the supplying range to low voltage system loads. (Wakatsuki, Y.)

  2. The control system based on PXI technology for high voltage power supply

    International Nuclear Information System (INIS)

    Chen Dehong; Zhang Ming; Ma Shaoxiang; Xia Linglong; Zeng Zhen; Zhang Xueliang; Wang Chuliang; Yu Kexun

    2014-01-01

    A 100 kV/60 A high voltage power supply (HVPS) is being developed to carry some auxiliary heating research on J-TEXT and supply the auxiliary heating system. The power supply which consists of 144 switch modules is based on PSM technology. For the requirement of isolation, control and protection, a control system based on the PCI extensions for instrumentation (PXI) which meets up with the CODAC standards is designed with developed PSM technology for the high voltage power supply. The compact structure of hardware in the control system is presented too. And the control strategy which is based on shift phase pulse width modulation is discussed Some tests are performed on the control system to validate the control strategy, the experimental results show that the system has a good control performance and fast response, which meets the control requirement of 100 kV/60 A high voltage power supply. (authors)

  3. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  4. Power system protection

    International Nuclear Information System (INIS)

    Venkata, S.S.; Damborg, M.J.; Jampala, A.K.

    1991-01-01

    Power systems of the 21st century will be more modern, and complex, utilizing the latest available technologies. At the same time, generating plants will have to operate with minimal spinning margins and energy transportation has to take place at critical levels due to environmental and economical constraints. These factors dictate that the power systems be protected with optimum sensitivity, selectivity and time of operation to assure maximum reliability, and security at minimal cost. With an increasing role played by digital computers in every aspect of protection, it is important to take a critical and fresh look at the art and science of relaying and protection. The main objective of this paper is to review the past, present and future of power system protection from a software point of view

  5. Magnet power system for the Microwave Tokamak Experiment (MTX)

    International Nuclear Information System (INIS)

    Jackson, M.C.; Musslewhite, R.C.

    1987-01-01

    The system configuration, layout, and general philosophy for the MTX magnet power system is described. The vast majority of the magnet power equipment was quite successfully used on the ALCATOR-C experiment at the Massachusetts Institute of Technology. The AC power for the magnet system at MIT was obtained from a 225MVA alternator. The power for the system at LLNL is obtained directly from the local utility's 230 kV line. This installation, therefore, necessitates the addition of a great deal of equipment in ranges from new switchgear in the substation to using existing switchgear obtained from MIT as contractors for intershop electrical isolation as well as safety isolation for personnel entry into the experimental area. Additionally, some discussion is made of the unique layout of this facility and the tradeoffs made to accommodate them. 2 refs., 6 figs

  6. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide applies to nuclear power plants for which the total power supply comprises normal power supply (which is electric) and emergency power supply (which may be electric or a combination of electric and non-electric). In its present form the Guide provides general guidance for all types of emergency power systems (EPS) - electric and non-electric, and specific guidance (see Appendix A) on the design principles and the features of the emergency electric power system (EEPS). Future editions will include a second appendix giving specific guidance on non-electric power systems. Section 3 of this Safety Guide covers information on considerations that should be taken into account relative to the electric grid, the transmission lines, the on-site electrical supply system, and other alternative power sources, in order to provide high overall reliability of the power supply to the EPS. Since the nuclear power plant operator does not usually control off-site facilities, the discussion of methods of improving off-site reliability does not include requirements for facilities not under the operator's control. Sections 4 to 11 of this Guide provide information, recommendations and requirements that would apply to any emergency power system, be it electric or non-electric

  7. UNISAT-3 Power System

    Science.gov (United States)

    Santoni, Fabio; Piergentili, Fabrizio; Bulgarelli, Fabio; Graziani, Filippo

    2005-05-01

    An overview of the UNISAT-3 microsatellite power subsystem is given. This is an educational, low weight and low cost microsatellite designed, built, launched and operated in space by students and professors of Scuola di Ingegneria Aerospaziale, at University of Rome "La Sapienza". The satellite power system is based on terrestrial technology solar arrays and NiCd batteries. The microsatellite hosts other solar arrays, including multi-junction solar cells and mono- crystalline silicon high efficiency solar cells, in order to compare their behaviour in orbit. Moreover a MPPT (Maximum Power Point Tracking ) system has been designed and tested, and it is a technological payload of UNISAT-3. The MPPT design follows the studies performed in the field of solar powered racing cars, with modifications to make the system suitable for use in space. The system design, numerical simulation and hardware ground testing are described in the paper. The experiment and the performance evaluation criterion are described, together with the preliminary results of the first eight months of operation in orbit.

  8. Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Eckard, R.D.; Van Ness, H.W.

    1979-01-01

    A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module

  9. Reliability analysis of self-supply system of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Kuklik, B.

    The results are summarized of the fault tree analysis of the V-1 power plant self-consumption system. The 6 kV busbars providing power for the main circulating pumps, the steam generator feed pumps and other important components including the 0.4 kV busbars are of the highest importance for nuclear safety. A fault tree analysis was also made of the emergency core cooling system of the reactor. Dangerous faults are defined and fault trees are developed. A brief description is given of the calculation algorithm for a digital computer. Some results are discussed. The calculated reliability of the emergency core cooling system is 10 5 years, of the 6 kV busbars it is 6.6x10 4 years. In case of a permanent or a long-term outage of the 220 kV stand-bye power supply, the system reliability is reduced to 7x10 2 years. (Z.M.)

  10. Wireless power transfer system

    Science.gov (United States)

    Wu, Hunter; Sealy, Kylee; Gilchrist, Aaron

    2016-02-23

    A system includes a first stage of an inductive power transfer system with an LCL load resonant converter with a switching section, an LCL tuning circuit, and a primary receiver pad. The IPT system includes a second stage with a secondary receiver pad, a secondary resonant circuit, a secondary rectification circuit, and a secondary decoupling converter. The secondary receiver pad connects to the secondary resonant circuit. The secondary resonant circuit connects to the secondary rectification circuit. The secondary rectification circuit connects to the secondary decoupling converter. The second stage connects to a load. The load includes an energy storage element. The second stage and load are located on a vehicle and the first stage is located at a fixed location. The primary receiver pad wirelessly transfers power to the secondary receiver pad across a gap when the vehicle positions the secondary receiver pad with respect to the primary receiver pad.

  11. Powering laser diode systems

    CERN Document Server

    Trestman, Grigoriy A

    2017-01-01

    This Tutorial Text discusses the competent design and skilled use of laser diode drivers (LDDs) and power supplies (PSs) for the electrical components of laser diode systems. It is intended to help power-electronic design engineers during the initial design stages: the choice of the best PS topology, the calculation of parameters and components of the PS circuit, and the computer simulation of the circuit. Readers who use laser diode systems for research, production, and other purposes will also benefit. The book will help readers avoid errors when creating laser systems from ready-made blocks, as well as understand the nature of the "mystical failures" of laser diodes (and possibly prevent them).

  12. How relay protection and automatic control systems react to the energizing of a 500 kV line

    Energy Technology Data Exchange (ETDEWEB)

    Gusev, V S; Kokovich, V E; Ovchinnikov, V V

    1966-04-01

    When the three phases of a 500 to 750 KV line are switched on to load by existing types of circuit breaker, a heavy aperiodic component of current appears in the secondaries of the neutral current transformers. The dc component, although damped, has a relatively long decay period. This effect is particularly evident in the case of high speed or nonsynchronized autoreclosure. The presence of such a large dc component can cause maloperation of the line earth fault protection unless special precautions are taken. Two complementary solutions are described, preventing the first stage earth fault protection from reacting to the aperiodic component, and reducing the time constant of the CT secondary circuits.

  13. AC power supply systems

    International Nuclear Information System (INIS)

    Law, H.

    1987-01-01

    An ac power supply system includes a rectifier fed by a normal ac supply, and an inverter connected to the rectifier by a dc link, the inverter being effective to invert the dc output of the receiver at a required frequency to provide an ac output. A dc backup power supply of lower voltage than the normal dc output of the rectifier is connected across the dc link such that the ac output of the rectifier is derived from the backup supply if the voltage of the output of the inverter falls below that of the backup supply. The dc backup power may be derived from a backup ac supply. Use in pumping coolant in nuclear reactor is envisaged. (author)

  14. KV7 potassium channels

    DEFF Research Database (Denmark)

    Stott, Jennifer B; Jepps, Thomas Andrew; Greenwood, Iain A

    2014-01-01

    Potassium channels are key regulators of smooth muscle tone, with increases in activity resulting in hyperpolarisation of the cell membrane, which acts to oppose vasoconstriction. Several potassium channels exist within smooth muscle, but the KV7 family of voltage-gated potassium channels have been...

  15. Power system optimization

    International Nuclear Information System (INIS)

    Bogdan, Zeljko; Cehil, Mislav

    2007-01-01

    Long-term gas purchase contracts usually determine delivery and payment for gas on the regular hourly basis, independently of demand side consumption. In order to use fuel gas in an economically viable way, optimization of gas distribution for covering consumption must be introduced. In this paper, a mathematical model of the electric utility system which is used for optimization of gas distribution over electric generators is presented. The utility system comprises installed capacity of 1500 MW of thermal power plants, 400 MW of combined heat and power plants, 330 MW of a nuclear power plant and 1600 MW of hydro power plants. Based on known demand curve the optimization model selects plants according to the prescribed criteria. Firstly it engages run-of-river hydro plants, then the public cogeneration plants, the nuclear plant and thermal power plants. Storage hydro plants are used for covering peak load consumption. In case of shortage of installed capacity, the cross-border purchase is allowed. Usage of dual fuel equipment (gas-oil), which is available in some thermal plants, is also controlled by the optimization procedure. It is shown that by using such a model it is possible to properly plan the amount of fuel gas which will be contracted. The contracted amount can easily be distributed over generators efficiently and without losses (no breaks in delivery). The model helps in optimizing of fuel gas-oil ratio for plants with combined burners and enables planning of power plants overhauls over a year in a viable and efficient way. (author)

  16. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  17. CIAE 600 kV ns pulse neutron generator

    International Nuclear Information System (INIS)

    Shen Guanren; Guan Xialing; Chen Hongtao

    2001-01-01

    The overall composition of CIAE 600 kV ns Pulse Neutron Generator (CPNG) are introduced, and its characteristic, main technological performance and application were also given. CPNG consists of high voltage power supply with highest output voltage 600 kV, direct current 15 mA, stability and ripple ≤0.1%, 2214 mm x 1604 mm x 1504 mm stainless steel high voltage electrode, built in head equipment uniform field accelerating tube, ns pulsed installation, turbomolecular vacuum pump system and drift pipes at 0 degree and 45 degree. Its characteristics are: (1) high current beam; (2) high current beam ns pulsed installation made use of low energy for chopper and high energy for buncher; (3) compactly laid out and simple in structure

  18. Using of explosive technologies for development of a compact current-limiting device for operation on 110 kV class systems

    Science.gov (United States)

    Shurupov, A. V.; Shurupov, M. A.; Kozlov, A. A.; Kotov, A. V.

    2016-11-01

    This paper considers the possibility of creating on new physical principles a highspeed current-limiting device (CLD) for the networks with voltage of 110 kV, namely, on the basis of the explosive switching elements. The device is designed to limit the steady short-circuit current to acceptable values for the time does not exceed 3 ms at electric power facilities. The paper presents an analysis of the electrical circuit of CLD. The main features of the scheme are: a new high-speed switching element with high regenerating voltage; fusible switching element that enables to limit the overvoltage after sudden breakage of network of the explosive switch; non-inductive resistor with a high heat capacity and a special reactor with operating time less than 1 s. We analyzed the work of the CLD with help of special software PSPICE, which is based on the equivalent circuit of single-phase short circuit to ground in 110 kV network. Analysis of the equivalent circuit operation CLD shows its efficiency and determines the CLD as a perspective direction of the current-limiting devices of new generation.

  19. Using of explosive technologies for development of a compact current-limiting device for operation on 110 kV class systems

    International Nuclear Information System (INIS)

    Shurupov, A V; Shurupov, M A; Kozlov, A A; Kotov, A V

    2016-01-01

    This paper considers the possibility of creating on new physical principles a highspeed current-limiting device (CLD) for the networks with voltage of 110 kV, namely, on the basis of the explosive switching elements. The device is designed to limit the steady short-circuit current to acceptable values for the time does not exceed 3 ms at electric power facilities. The paper presents an analysis of the electrical circuit of CLD. The main features of the scheme are: a new high-speed switching element with high regenerating voltage; fusible switching element that enables to limit the overvoltage after sudden breakage of network of the explosive switch; non-inductive resistor with a high heat capacity and a special reactor with operating time less than 1 s. We analyzed the work of the CLD with help of special software PSPICE, which is based on the equivalent circuit of single-phase short circuit to ground in 110 kV network. Analysis of the equivalent circuit operation CLD shows its efficiency and determines the CLD as a perspective direction of the current-limiting devices of new generation. (paper)

  20. The electric power engineering handbook power systems

    CERN Document Server

    2012-01-01

    Power Systems, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) covers all aspects of power system protection, dynamics, stability, operation, and control. Under the editorial guidance of L.L. Grigsby, a respected and accomplished authority in power engineering, and section editors Andrew Hanson, Pritindra Chowdhuri, Gerry Sheble, and Mark Nelms, this carefully crafted reference includes substantial new and revised contributions from worldwide leaders in the field. This content provides convenient access to overviews and detailed information on a diverse arr

  1. Effects of electromagnetic field of 33 and 275 kV influences on ...

    African Journals Online (AJOL)

    The effects of electromagnetic fields (EMF) from 33 and 275 kV high voltage transmission line on biochemical and antioxidant system changes in mustard leaf (Brassica chinensis) were investigated under field condition. Mustard leaves were exposed to EMF from power lines at distances of 0, 3, 6, 9, 10, 12, 15, 18, 20, 21, ...

  2. harmonic load modeling: a case study of 33 kv abuja steel mill feeder

    African Journals Online (AJOL)

    HOD

    An in-depth study of the harmonic orders inherent in a power system network is required ... This paper studied the harmonic orders of the 33 kV Abuja Steel Feeder .... models for various industrial and household electrical ..... Malaysia, 2013.

  3. Wind power plant system services

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit

    Traditionally, conventional power plants have the task to support the power system, by supplying power balancing services. These services are required by the power system operators in order to secure a safe and reliable operation of the power system. However, as in the future the wind power...... is going more and more to replace conventional power plants, the sources of conventional reserve available to the system will be reduced and fewer conventional plants will be available on-line to share the regulation burden. The reliable operation of highly wind power integrated power system might...... then beat risk unless the wind power plants (WPPs) are able to support and participate in power balancing services. The objective of this PhD project is to develop and analyse control strategies which can increase the WPPs capability to provide system services, such as active power balancing control...

  4. Power conditioning unit for photovoltaic power systems

    Science.gov (United States)

    Beghin, G.; Nguyen Phuoc, V. T.

    Operational features and components of a power conditioning unit for interconnecting solar cell module powers with a utility grid are outlined. The two-stage unit first modifies the voltage to desired levels on an internal dc link, then inverts the current in 2 power transformers connected to a vector summation control to neutralize harmonic distortion up to the 11th harmonic. The system operates in parallel with the grid with extra inductors to absorb line-to-line voltage and phase differences, and permits peak power use from the PV array. Reactive power is gained internally, and a power system controller monitors voltages, frequencies, and currents. A booster preregulator adjusts the input voltage from the array to provide voltage regulation for the inverter, and can commutate 450 amps. A total harmonic distortion of less than 5 percent is claimed, with a rating of 5 kVA, 50/60 Hz, 3-phase, and 4-wire.

  5. Design and development of power supplies for high power IOT based RF amplifier

    International Nuclear Information System (INIS)

    Kumar, Yashwant; Kumari, S.; Ghosh, M.K.; Bera, A.; Sadhukhan, A.; Pal, S.S.; Khare, V.K.; Tiwari, T.P.; Thakur, S.K.; Saha, S.

    2013-01-01

    Design, development, circuit topology, function of system components and key system specifications of different power supplies for biasing electrodes of Thales Inductive Output Tube (IOT) based high power RF amplifier are presented in this paper. A high voltage power supply (-30 kV, 3.2A dc) with fast (∼microsecond) crowbar protection circuit is designed, developed and commissioned at VECC for testing the complete setup. Other power supplies for biasing grid electrode (300V, 0.5A dc) and Ion Pump (3 kV, 0.1mA dc) of IOT are also designed, developed and tested with actual load. A HV Deck (60kV Isolation) is specially designed in house to place these power supplies which are floating at 30 kV. All these power supplies are powered by an Isolation Transformer (5 kVA, 60 kV isolation) designed and developed in VECC. (author)

  6. Concentrating Solar Power Systems

    Science.gov (United States)

    Pitz-Paal, R.

    2017-07-01

    Development of Concentrating Solar Power Systems has started about 40 years ago. A first commercial implementation was performed between 1985 and 1991 in California. However, a drop in gas prices caused a longer period without further deployment. It was overcome in 2007 when new incentive schemes for renewables in Spain and the US enabled a commercial restart. In 2016, almost 100 commercial CSP plants with more than 5GW are installed worldwide. This paper describes the physical background of CSP technology, its technical characteristics and concepts. Furthermore, it discusses system performances, cost structures and the expected advancement.

  7. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  8. Reactive Power Management in Electric Power Systems

    African Journals Online (AJOL)

    (Ferranti effect) would limit the power transfer and the transmission range in the absence of any compensation measures. Journal of EAEA, Vol 14, 1997. In this paper, the management of the reactive power is explored with the aim of improving the quality and the reliability of the supply in the EELPA's interconnected system ...

  9. Inductive-pulsed power supplying system for a betatron electromagnet

    International Nuclear Information System (INIS)

    Otrubyannikov, Yu.A.; Safronov, A.S.

    1984-01-01

    Circuit of producing quasitriangular current pulses designed for the pulsed power supply system of betatron electromagnet is described. Introduction of additional winding into electromagnet provides circuit galvanic isolation, artificial commutation of basic circuit thyristors and inductive power input to the winding during thyristor commutation. The considered system is used for excitation of betatron electromagnet up to 18 MeV. Magnetic field energy equals 1100 Y. The maximal voltage in energy storage capacitor - 4.8 kV. Current amplitude in basic winding - 335 A. The number of loops in basic winding equals 80, in additional one - 32. Current pulse duration in electromagnet-3.8 ms. The system provides operation with controlled current pulse frequency from 0 up to 150 Hz. The maximal consumption power - 18 kW

  10. Power System for Intelligent House

    Directory of Open Access Journals (Sweden)

    Michal Jahelka

    2010-01-01

    Full Text Available Power supply of intelligent houses or house phones is possible to do with standard transformer with voltage stabilizer or with intelligent power supply. Standard solution can has as a result of failure fuse blown or fire occurrence. Intelligent power supply switch off power and tests with little current whether short circuit is removed. After it resume system power supply. At the same time it cares of system backup with accumulator, informs control system about short circuit or failure net power supply, or can switch off all system power after command from control system.

  11. TOPEX electrical power system

    Science.gov (United States)

    Chetty, P. R. K.; Roufberg, Lew; Costogue, Ernest

    1991-01-01

    The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

  12. Needs and Possibility of Involving Nuclear Power Plant in the Macedonian Power System

    International Nuclear Information System (INIS)

    Bosevski, T.; Causevski, A.

    1998-01-01

    The Macedonian Power System (MPS) used to be a part of the former Yugoslav Power System, and it was connected to the European system by 400 kV transmission lines. At the present time, the MPS works isolated from the UCPTE, only connected to the Yugoslav and Greek power systems. The connections with the Bulgarian and Albanian power systems are on a lower voltage level. The reliability and stability of the MPS needs to be improved. Macedonia is located in the central area of the Balkan, where the transmission systems from other Balkan countries are crossing. in the near future, the Macedonian Power System needs to be linked to the European system. To prepare for the energy demand at the beginning of the 21-st century, when the local coal reserves get exhausted, Macedonia needs to start with activities for substitution of the existing coal-fired thermal power plants with nuclear plants. This paper discusses the activities for global development solutions in the area of power generation. (author)

  13. Dynamic Performance of the ITER Reactive Power Compensation System

    International Nuclear Information System (INIS)

    Sheng Zhicai; Fu Peng; Xu Liuwei

    2011-01-01

    Dynamic performance of a reactive power compensation (RPC) system for the international thermonuclear experimental reactor (ITER) power supply is presented. Static var compensators (SVCs) are adopted to mitigate voltage fluctuation and reduce the reactive power down to a level acceptable for the French/European 400 kV grid. A voltage feedback and load power feedforward controller for SVC is proposed, with the feedforward loop intended to guarantee short response time and the feedback loop ensuring good dynamics and steady characteristics of SVC. A mean filter was chosen to measure the control signals to improve the dynamic response. The dynamic performance of the SVC is verified by simulations using PSCAD/EMTDC codes.

  14. Power Systems Development Facility

    International Nuclear Information System (INIS)

    1993-06-01

    The objective of the PSDF would be to provide a modular facility which would support the development of advanced, pilot-scale, coal-based power systems and hot gas clean-up components. These pilot-scale components would be designed to be large enough so that the results can be related and projected to commercial systems. The facility would use a modular approach to enhance the flexibility and capability for testing; consequently, overall capital and operating costs when compared with stand-alone facilities would be reduced by sharing resources common to different modules. The facility would identify and resolve technical barrier, as well as-provide a structure for long-term testing and performance assessment. It is also intended that the facility would evaluate the operational and performance characteristics of the advanced power systems with both bituminous and subbituminous coals. Five technology-based experimental modules are proposed for the PSDF: (1) an advanced gasifier module, (2) a fuel cell test module, (3) a PFBC module, (4) a combustion gas turbine module, and (5) a module comprised of five hot gas cleanup particulate control devices. The final module, the PCD, would capture coal-derived ash and particles from both the PFBC and advanced gasifier gas streams to provide for overall particulate emission control, as well as to protect the combustion turbine and the fuel cell

  15. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-07-01

    This report discusses Test Campaign TC12 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (SW) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC12 began on May 16, 2003, with the startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until May 24, 2003, when a scheduled outage occurred to allow maintenance crews to install the fuel cell test unit and modify the gas clean-up system. On June 18, 2003, the test run resumed when operations relit the start-up burner, and testing continued until the scheduled end of the run on July 14, 2003. TC12 had a total of 733 hours using Powder River Basin (PRB) subbituminous coal. Over the course of the entire test run, gasifier temperatures varied between 1,675 and 1,850 F at pressures from 130 to 210 psig.

  16. Analysis on the Operation Strategy of the 220kV External Transmission Channel for the Nujiang Power Grid after the Installation of Series Compensation

    Science.gov (United States)

    Liu, Xiaoxin; Feng, Peilei; Jan, Lisheng; Dai, Xiaozhong; Cai, Pengcheng

    2018-01-01

    In recent years, Nujiang Prefecture vigorously develop hydropower, the grid structure in the northwest of Yunnan Province is not perfect, which leads to the research and construction of the power grid lags behind the development of the hydropower. In 2015, the company in view of the nu river hydropower dilemma decided to change outside the nu river to send out a passage with series compensation device in order to improve the transmission capacity, the company to the main problems related to the system plan, but not too much in the region distribution network and detailed study. Nujiang power grid has unique structure and properties of the nujiang power grid after respectively, a whole rack respectively into two parts, namely power delivery channels, load power supply, the whole grid occurred fundamental changes, the original strategy of power network is not applicable, especially noteworthy is the main failure after network of independent operation problem, how to avoid the local series, emergency problem is more urgent, very tolerance test area power grid, this paper aims at the analysis of existing data, simulation, provide a reference for respectively after the operation for the stable operation of the power grid.

  17. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with AC Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  18. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with Ac Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  19. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  20. POWER SYSTEMS DEVELOPMENT FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2002-11-01

    This report discusses test campaign GCT4 of the Kellogg Brown & Root, Inc. (KBR) transport reactor train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The transport reactor is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using one of two possible particulate control devices (PCDs). The transport reactor was operated as a pressurized gasifier during GCT4. GCT4 was planned as a 250-hour test run to continue characterization of the transport reactor using a blend of several Powder River Basin (PRB) coals and Bucyrus limestone from Ohio. The primary test objectives were: Operational Stability--Characterize reactor loop and PCD operations with short-term tests by varying coal-feed rate, air/coal ratio, riser velocity, solids-circulation rate, system pressure, and air distribution. Secondary objectives included the following: Reactor Operations--Study the devolatilization and tar cracking effects from transient conditions during transition from start-up burner to coal. Evaluate the effect of process operations on heat release, heat transfer, and accelerated fuel particle heat-up rates. Study the effect of changes in reactor conditions on transient temperature profiles, pressure balance, and product gas composition. Effects of Reactor Conditions on Synthesis Gas Composition--Evaluate the effect of air distribution, steam/coal ratio, solids-circulation rate, and reactor temperature on CO/CO{sub 2} ratio, synthesis gas Lower Heating Value (LHV), carbon conversion, and cold and hot gas efficiencies. Research Triangle Institute (RTI) Direct Sulfur Recovery Process (DSRP) Testing--Provide syngas in support of the DSRP commissioning. Loop Seal Operations--Optimize loop seal operations and investigate increases to previously achieved maximum solids-circulation rate.

  1. Protection and switching system for the RFX power supply

    International Nuclear Information System (INIS)

    Browning, J.L.; Gray, J.W.; Mace, T.A.; Varley, G.L.

    1986-01-01

    The RFX toroidal field power supply comprises a large 4.8MJ (max) modular capacitor bank and four 14MW AC/DC converter flat-top power supply modules. The high fault level associated with the capacitor banks presents a problem in the design of the switching system, since mistiming could produce large currents in the flat-top supplies. The poloidal circuit consists of four groups of magnetising windings connected in series, each with its own flat-top convertor supply and opening switch transfer system. The flat-top converter supplies are needed when the transfer voltage has fallen from approximately 40kV to 1kV. Solutions to the problem of designing a fault-tolerant system which presents no danger to the flat-top converters are described in the paper. The adopted methods make use of hybrid ignitron/mechanical switches to give the required combination of switching speed and current carrying capacity, together with careful attention to the circuit layout of different switching elements. (author)

  2. The pan-Kv7 (KCNQ) Channel Opener Retigabine Inhibits Striatal Excitability by Direct Action on Striatal Neurons In Vivo

    DEFF Research Database (Denmark)

    Hansen, Henrik H; Weikop, Pia; Mikkelsen, Maria D

    2017-01-01

    Central Kv7 (KCNQ) channels are voltage-dependent potassium channels composed of different combinations of four Kv7 subunits, being differently expressed in the brain. Notably, striatal dopaminergic neurotransmission is strongly suppressed by systemic administration of the pan-Kv7 channel opener ...... by acute systemic haloperidol administration in the rat. The relative mRNA levels of Kv7 subunits in the rat striatum were found to be Kv7.2 = Kv7.3 = Kv7.5 > >Kv7.4. These data suggest that intrastriatal Kv7 channels play a direct role in regulating striatal excitability in vivo....

  3. Solar thermal power system

    Science.gov (United States)

    Bennett, Charles L.

    2010-06-15

    A solar thermal power generator includes an inclined elongated boiler tube positioned in the focus of a solar concentrator for generating steam from water. The boiler tube is connected at one end to receive water from a pressure vessel as well as connected at an opposite end to return steam back to the vessel in a fluidic circuit arrangement that stores energy in the form of heated water in the pressure vessel. An expander, condenser, and reservoir are also connected in series to respectively produce work using the steam passed either directly (above a water line in the vessel) or indirectly (below a water line in the vessel) through the pressure vessel, condense the expanded steam, and collect the condensed water. The reservoir also supplies the collected water back to the pressure vessel at the end of a diurnal cycle when the vessel is sufficiently depressurized, so that the system is reset to repeat the cycle the following day. The circuital arrangement of the boiler tube and the pressure vessel operates to dampen flow instabilities in the boiler tube, damp out the effects of solar transients, and provide thermal energy storage which enables time shifting of power generation to better align with the higher demand for energy during peak energy usage periods.

  4. High power communication satellites power systems study

    International Nuclear Information System (INIS)

    Josloff, A.T.; Peterson, J.R.

    1994-01-01

    This paper discusses a DOE-funded study to evaluate the commercial attractiveness of high power communication satellites and assesses the attributes of both conventional photovoltaic and reactor power systems. This study brings together a preeminent US Industry/Russian team to cooperate on the role of high power communication satellites in the rapidly expanding communications revolution. These high power satellites play a vital role in assuring availability of universally accessible, wide bandwidth communications, for high definition TV, super computer networks and other services. Satellites are ideally suited to provide the wide bandwidths and data rates required and are unique in the ability to provide services directly to the users. As new or relocated markets arise, satellites offer a flexibility that conventional distribution services cannot match, and it is no longer necessary to be near population centers to take advantage of the telecommunication revolution. The geopolitical implications of these substantially enhanced communications capabilities will be significant

  5. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  6. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  7. Synchronized Phasor Measurements of a Power System Event in Eastern Denmark

    DEFF Research Database (Denmark)

    Rasmussen, Joana; Jørgensen, Preben

    2003-01-01

    . The outage of the 400-kV tie-line weakened the Eastern Danish power system and excited power oscillations in the interconnected power systems. During this event prototype Phasor Measurements Units (PMU) gave the opportunity of realtime monitoring of positive sequence voltage and current phasors using...... satellite-based Global Positioning System (GPS). Comparisons between real-time recordings and results from dynamic simulations with PSS/E are presented. The main features from the simulation analysis are successfully verified by means of the corresponding synchronized phasor measurements....

  8. Synchronized Phasor Measurements of a Power System Event in Eastern Denmark

    DEFF Research Database (Denmark)

    Rasmussen, Joana; Jørgensen, Preben

    2006-01-01

    . The outage of the 400-kV tie-line weakened the Eastern Danish power system and excited power oscillations in the interconnected power systems. During this event prototype Phasor Measurements Units (PMU) gave the opportunity of realtime monitoring of positive sequence voltage and current phasors using...... satellite-based Global Positioning System (GPS). Comparisons between real-time recordings and results from dynamic simulations with PSS/E are presented. The main features from the simulation analysis are successfully verified by means of the corresponding synchronized phasor measurements....

  9. Development of high power pumping system for capillary discharge EUV laser

    International Nuclear Information System (INIS)

    Sakai, Yusuke; Komatsu, Takanori; Watanabe, Masato; Okino, Akitoshi; Hotta, Eiki

    2008-01-01

    Development of high power pumping system for capillary discharge soft X-ray laser is reported. The pulsed power system consists of a 2.2 μF LC generator, a 2:54 step-up transformer and a 3 nF water capacitor. Taking advantage of high efficiency configuration, step-up ratio of water capacitor voltage to LC generator initial voltage is about 40 times. Consequently, obtained water capacitor voltage reaches about 450 kV when LC generator was charged to 12.5 kV. As a consequent, possibility of charging a water capacitor to 1 MV is demonstrated. With this extremely compact system, discharge current could be increased to nearly 100 kA through moderately long capillary, which leads to generation of high-density and high-temperature plasma column in order to realize EUV laser. (author)

  10. Impact of Considering 110 kV Grid Structures on the Congestion Management in the German Transmission Grid

    Science.gov (United States)

    Hoffrichter, André; Barrios, Hans; Massmann, Janek; Venkataramanachar, Bhavasagar; Schnettler, Armin

    2018-02-01

    The structural changes in the European energy system lead to an increase of renewable energy sources that are primarily connected to the distribution grid. Hence the stationary analysis of the transmission grid and the regionalization of generation capacities are strongly influenced by subordinate grid structures. To quantify the impact on the congestion management in the German transmission grid, a 110 kV grid model is derived using publicly available data delivered by Open Street Map and integrated into an existing model of the European transmission grid. Power flow and redispatch simulations are performed for three different regionalization methods and grid configurations. The results show a significant impact of the 110 kV system and prove an overestimation of power flows in the transmission grid when neglecting subordinate grids. Thus, the redispatch volume in Germany to dissolve bottlenecks in case of N-1 contingencies decreases by 38 % when considering the 110 kV grid.

  11. Balancing modern Power System with large scale of wind power

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit; Hansen, Anca Daniela

    2014-01-01

    Power system operators must ensure robust, secure and reliable power system operation even with a large scale integration of wind power. Electricity generated from the intermittent wind in large propor-tion may impact on the control of power system balance and thus deviations in the power system...... frequency in small or islanded power systems or tie line power flows in interconnected power systems. Therefore, the large scale integration of wind power into the power system strongly concerns the secure and stable grid operation. To ensure the stable power system operation, the evolving power system has...... to be analysed with improved analytical tools and techniques. This paper proposes techniques for the active power balance control in future power systems with the large scale wind power integration, where power balancing model provides the hour-ahead dispatch plan with reduced planning horizon and the real time...

  12. Beam Extraction for 1-MV Electrostatic Accelerator at the 300 kV Test Stand

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sae-Hoon; Kim, Yu-Seok [Dongguk University, Seoul (Korea, Republic of); Kwon, Hyeok-Jung; Cho, Yong-Sub [KOMAC, Gyeongju (Korea, Republic of)

    2015-05-15

    The Korea Multipurpose Accelerator Complex (KOMAC) has been developing a 300-kV test stand for a 1-MV electrostatic accelerator ion source. The ion source in the high-pressure vessel is required to have a high reliability. The test stand has been proposed and developed to confirm the stable operating conditions of the ion source. The ion source will be tested at the test stand to verify the long-time operating conditions. The test stand comprises a 300-kV high-voltage terminal, a battery for the ion-source power, a 60-Hz inverter, 200-MHz RF power, a 5-kV extraction power supply, a 300-kV accelerating tube, and a vacuum system. A beam extraction experiment for the test stand was performed, and the beam current was measured using a faraday cup in the chamber. A beam extraction results for the RF ion source will be presented. Beam extraction from the RF ion source of the test stand is verified by measuring the beam current with a faraday cup in the chamber. Thus far NI Labview, PLC and faraday cup have been used to measure the beam current. The OPC server is useful for monitoring the PLC values. The average beam current of (a), (b) and (c) shown in figure 2 are 110.241µA, 105.8597µA and 103.5278µA respectively.

  13. Modeling and power system stability of VSC-HVDC systems for grid-connection of large offshore windfarms

    Energy Technology Data Exchange (ETDEWEB)

    Xue Yijing [Vestas China, Beijing (China); Akhmatov, Vladislav [Technical Univ. of Denmark, Lyngby (Denmark). Centre for Electric Technology

    2009-07-01

    Utilization of Voltage Source Converter (VSC) - High Voltage Direct Current (HVDC) systems for grid-connection of large offshore windfarms becomes relevant as installed power capacities as well as distances to the connection points of on-land transmission systems increase. At the same time, the grid code requirements of the Transmission System Operators (TSO), including ancillary system services and Low-Voltage Fault-Ride-Through (LVFRT) capability of large offshore windfarms, become more demanding. This paper presents a general-level model of and a LVFRT solution for a VSC-HVDC system for grid-connection of large offshore windfarms. The VSC-HVDC model is implemented using a general approach of independent control of active and reactive power in normal operations. The on-land VSC inverter, i.e. a grid-side inverter, provides voltage support to the transmission system and comprises a LVFRT solution in short-circuit faults. The presented model, LVFRT solution and impact on the system stability are investigated as a case study of a 1,000 MW offshore windfarm grid-connected through a VSC-HVDC system. The investigation is carried out on a model of the west Danish, with some elements of the north German, 400 kV, 220 kV and 150 kV transmission systems stage 2005-2006 using the DIgSILENT PowerFactory simulation program. In the investigation, a thermal power plant just south to the Danish border has been substituted by this 1,000 MW offshore windfarm utilizing the VSC-HVDC system. The investigation has shown that the substitution of a thermal power plant by a VSC-HVDC connected offshore windfarm should not have any negative impact on the short-term stability of the west Danish transmission system. The investigation should be repeated applying updated system model stages and offshore wind power commissioning schedules in the North and Baltic Seas. (orig.)

  14. Test results of full-scale high temperature superconductors cable models destined for a 36 kV, 2 kA(rms) utility demonstration

    DEFF Research Database (Denmark)

    Daumling, M.; Rasmussen, C.N.; Hansen, F.

    2001-01-01

    Power cable systems using high temperature superconductors (HTS) are nearing technical feasibility. This presentation summarises the advancements and status of a project aimed at demonstrating a 36 kV, 2 kA(rms) AC cable system by installing a 30 m long full-scale functional model in a power...

  15. Simulation of interaction between wind farm and power system[Flicker

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.; Hansen, A.; Janosi, L.; Bech, J.; Bak-Jensen, B.

    2001-12-01

    A dynamic model of the wind farm Hagesholm has been implemented in the dedicated power system simulation program DIgSILENT. The wind farm consists of six 2MW NM2000/72 wind turbines from NEG-Micon. The model has been verified using simultaneous power quality measurements on the 10 kV terminals of a single wind turbine and power performance measurements on two wind turbines. The verification shows a generally good agreement between simulations and measurements, although the simulations at higher wind speeds seem to underestimate the power and voltage fluctuations. A way to improve the simulation at higher wind speeds is suggested. (au)

  16. High power communication satellites power systems study

    Science.gov (United States)

    Josloff, Allan T.; Peterson, Jerry R.

    1995-01-01

    This paper discusses a planned study to evaluate the commercial attractiveness of high power communication satellites and assesses the attributes of both conventional photovoltaic and reactor power systems. These high power satellites can play a vital role in assuring availability of universally accessible, wide bandwidth communications, for high definition TV, super computer networks and other services. Satellites are ideally suited to provide the wide bandwidths and data rates required and are unique in the ability to provide services directly to the users. As new or relocated markets arise, satellites offer a flexibility that conventional distribution services cannot match, and it is no longer necessary to be near population centers to take advantage of the telecommunication revolution. The geopolitical implications of these substantially enhanced communications capabilities can be significant.

  17. Interconnected power systems

    International Nuclear Information System (INIS)

    Fassina, E.

    2001-01-01

    The import of electric power from foreign countries at profitable prices is today a determinant factor to prime the competition in a national free trade. It is important to define the power transmission capacity and economic regulations for import forms in 2001 [it

  18. Touch and step potential analysis at 23.9kV to 4.16kV & 13.8kV to 4.16kV distribution substations with pad-mounted transformers, floating grounds, and other exposed ungrounded metal bodies using WinIGS

    Science.gov (United States)

    Guzman, David G.

    An electrical substation is composed of various subsystems that allow for the effective and safe operation of the power grid. One of the subsystems integrating a conventional substation is defined as the ground grid system. This system allows for the effective operation of the power grid and all the electrical equipment connected to it by providing a ground potential reference, commonly known as the system ground. In addition, the ground grid system provides safety to the workers and the public transiting inside or living nearby a substation by reducing the step and touch potential (or voltage) levels present during a system fault. In today's utility industry practices there is an increasing trend for using pad-mounted electrical equipment for substation applications in an effort to construct new or upgrade existing electrical facilities inside limited property spaces. This thesis work presents an analysis for the effects of touch and step voltages at existing distribution substations where 23.9kV to 4.16kV & 13.8kV to 4.16kV pad-mounted transformers and other pad-mounted switchgear was installed to replace the traditional station class equipment. Moreover, this study will expose modeling techniques employed to define and determine the effects of floating grounds and other exposed metal bodies inside or surrounding these substations using WinIGS; this is in an effort to determine any risks of electric shock associated with this type of installations. The results presented in this work are intended to verify the requirements for the ground grid analysis and design for 4.16kV distribution substations with pad-mounted equipment in order to prevent dangerous step and touch voltage levels appearing at these sites during system faults; and ultimately prevent exposing individuals to the risk of an electric shock.

  19. Reliability assessment of distribution power systems including distributed generations

    International Nuclear Information System (INIS)

    Megdiche, M.

    2004-12-01

    Nowadays, power systems have reached a good level of reliability. Nevertheless, considering the modifications induced by the connections of small independent producers to distribution networks, there's a need to assess the reliability of these new systems. Distribution networks present several functional characteristics, highlighted by the qualitative study of the failures, as dispersed loads at several places, variable topology and some electrotechnical phenomena which must be taken into account to model the events that can occur. The adopted reliability calculations method is Monte Carlo simulations, the probabilistic method most powerful and most flexible to model complex operating of the distribution system. We devoted a first part on the case of a 20 kV feeder to which a cogeneration unit is connected. The method was applied to a software of stochastic Petri nets simulations. Then a second part related to the study of a low voltage power system supplied by dispersed generations. Here, the complexity of the events required to code the method in an environment of programming allowing the use of power system calculations (load flow, short-circuit, load shedding, management of units powers) in order to analyse the system state for each new event. (author)

  20. Skylab technology electrical power system

    Science.gov (United States)

    Woosley, A. P.; Smith, O. B.; Nassen, H. S.

    1974-01-01

    The solar array/battery power systems for the Skylab vehicle were designed to operate in a solar inertial pointing mode to provide power continuously to the Skylab. Questions of power management are considered, taking into account difficulties caused by the reduction in power system performance due to the effects of structural failure occurring during the launching process. The performance of the solar array of the Apollo Telescope Mount Power System is discussed along with the Orbital Workshop solar array performance and the Airlock Module power conditioning group performance. A list is presented of a number of items which have been identified during mission monitoring and are recommended for electrical power system concepts, designs, and operation for future spacecraft.

  1. Nuclear power plant diagnostic system

    International Nuclear Information System (INIS)

    Prokop, K.; Volavy, J.

    1982-01-01

    Basic information is presented on diagnostic systems used at nuclear power plants with PWR reactors. They include systems used at the Novovoronezh nuclear power plant in the USSR, at the Nord power plant in the GDR, the system developed at the Hungarian VEIKI institute, the system used at the V-1 nuclear power plant at Jaslovske Bohunice in Czechoslovakia and systems of the Rockwell International company used in US nuclear power plants. These diagnostic systems are basically founded on monitoring vibrations and noise, loose parts, pressure pulsations, neutron noise, coolant leaks and acoustic emissions. The Rockwell International system represents a complex unit whose advantage is the on-line evaluation of signals which gives certain instructions for the given situation directly to the operator. The other described systems process signals using similar methods. Digitized signals only serve off-line computer analyses. (Z.M.)

  2. Reactor power control system

    International Nuclear Information System (INIS)

    Tomisawa, Teruaki.

    1981-01-01

    Purpose: To restore reactor-power condition in a minimum time after a termination of turbine bypass by reducing the throttling of the reactor power at the time of load-failure as low as possible. Constitution: The transient change of the internal pressure of condenser is continuously monitored. When a turbine is bypassed, a speed-control-command signal for a coolant recirculating pump is generated according as the internal pressure of the condenser. When the signal relating to the internal pressure of the condenser indicates insufficient power, a reactor-control-rod-drive signal is generated. (J.P.N.)

  3. Insulation model of power lead for 66 kV class superconducting fault current limiter; Chodendo genryuki denryu rido yo zetsuen no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Sakai, M.; Fukuda, A.; Shimada, M.; Urata, M. [Toshiba Corp., Tokyo (Japan); Okuma, T.; Sato, Y.; Iwata, Y. [Tokyo Electric Power Co. Ink., Tokyo (Japan)

    1999-06-07

    We advance the development of high-temperature superconductivity current limiter using the normal conduction transition. Since the rated voltage is high with 66kV, we desire that solid insulation which consists of main insulating layer and multiple layers in semiconductive layer is conducted to the current lead which connects the ordinary temperature and very low temperature division. And, it is necessary to sufficiently decrease the void, since crack proof and dielectric strength lower, when large bubble exists in the main insulating layer. We use ethylene propylene rubber for the solid insulation of superconducting cable. Though filler has entered the EP-rubber, the formability lowers, when we put filler in, and the void becomes easy to be generated. Then, we produced the current lead insulation model using the EP-rubber without filler, and we carried out crack-resistant test and withstand voltage test. (NEDO)

  4. Power system protection 3 application

    CERN Document Server

    1995-01-01

    The worldwide growth in demand for electricity has forced the pace of developments in electrical power system design to meet consumer needs for reliable, secure and cheap supplies. Power system protection, as a technology essential to high quality supply, is widely recognised as a specialism of growing and often critical importance, in which power system needs and technological progress have combined to result in rapid developments in policy and practice in recent years. In the United Kingdom, the need for appropriate training in power system protection was recognised in the early 1960s with t

  5. Power Aware Distributed Systems

    National Research Council Canada - National Science Library

    Schott, Brian

    2004-01-01

    The goal of PADS was to study power aware management techniques for wireless unattended ground sensor applications to extend their operational lifetime and overall capabilities in this battery-constrained environment...

  6. Water Powered Bioassay System

    National Research Council Canada - National Science Library

    Lin, Liwei

    2004-01-01

    ... of 0.2 1/hr without requiring electrical power. A low-leakage, hole-in-the-wall micro valve was demonstrated that provided fluidic resistance 255 times higher in the closed state than in the open state...

  7. Normalized noise power spectrum of full field digital mammography system

    International Nuclear Information System (INIS)

    Norriza Mohd Isa; Wan Muhamad Saridan Wan Hassan

    2009-01-01

    A method to measure noise power spectrum of a full field digital mammography system is presented. The effect of X-ray radiation dose, size and configuration of region of interest on normalized noise power spectrum (NNPS) was investigated. Flat field images were acquired using RQA-M2 beam quality technique (Mo/Mo anode-filter, 28 kV, 2 mm Al) with different clinical radiation doses. The images were cropped at about 4 cm from the edge of the breast wall and then divided into different size of non-overlapping or overlapping segments. NNPS was determined through detrending, 2-D fast Fourier transformation and normalization. Our measurement shows that high radiation dose gave lower NNPS at a specific beam quality. (Author)

  8. Normalized Noise Power Spectrum of Full Field Digital Mammography System

    International Nuclear Information System (INIS)

    Isa, Norriza Mohd; Wan Hassan, Wan Muhamad Saridan

    2010-01-01

    A method to measure noise power spectrum of a full field digital mammography system is presented. The effect of X-ray radiation dose, size and configuration of region of interest on normalized noise power spectrum (NNPS) was investigated. Flat field images were acquired using RQA-M2 beam quality technique (Mo/Mo anode-filter, 28 kV, 2 mm Al) with different clinical radiation doses. The images were cropped at about 4 cm from the edge of the breast wall and then divided into different size of non-overlapping or overlapping segments. NNPS was determined through detrending, 2-D fast Fourier transformation and normalization. Our measurement shows that high radiation dose gave lower NNPS at a specific beam quality.

  9. A high voltage power line: the route with the least environmental and health impact. Public consultation on the plan to rebuild the 400 kV power line between Lille and Arras

    International Nuclear Information System (INIS)

    Carlier, Jean-Louis; Chardonnet, Claude

    2017-01-01

    The upgrade to double-circuit of the 400-kV power line between Avelin and Gavrelle (Northern France) was first set in motion to improve security and to adapt the network to renewable energy sources or energy transition. Since 2011, it has been the object of an unprecedented consultation process, in terms of duration as well as magnitude. From 2012 to 2015, after much discussion, the contracting authority, Reseau Transport d'Electricite (RTE), determined the line with the least consequential environmental and health effects and presented it to the 2016 spring public inquiry. Information and communication requirements were adapted at each stage of the project, to take local concerns into account. Health concerns about the magnetic fields and noise generated by the electric lines were expressed from the very beginning of the consultation and were therefore treated with special care, through knowledge-sharing, debate and specific studies. A health committee, comprising volunteers from various backgrounds, was entrusted with informing the general public and providing suggestions to RTE and the health authorities, through in-depth discussions about health issues. The committee also asked RTE to conduct studies and measure electromagnetic fields to support an informed decision. As a result, the contracting authority defined the route of the electric line based primarily on the distance between houses and the line. The committee also obtained further commitments from RTE to minimize the magnetic fields emitted by the line with a new type of pylon and to monitor the effects on the people living along the line over time. During the course of this consultation process, shared knowledge together with a continuous dialogue on local health concerns aided the search for the route with the least consequential environmental and health impact. (authors)

  10. DC in urban areas distribution power systems and microgrids; Tasajaennite taajaman saehkoenjakelussa ja mikroverkoissa

    Energy Technology Data Exchange (ETDEWEB)

    Kylkisalo, T.; Alanen, R.

    2007-09-15

    This study deals with the utilization of DC distribution power systems and energy storages in urban areas. The properties and the components, that make the DC distribution power systems possible, are specifically examined from the perspective of the power system's control topology. The role of the energy storages as a part of the DC distribution power system and a tool of power quality control was also discussed. Using PSCAD/EMTDC simulation program two different concepts of the DC distribution power systems were simulated. Both low and medium voltage networks were designed as microgrids, which were capable operation without medium voltage feeder from the outside network as the entity of energy storages, auxiliary power source and loads. It emerged from the simulation that DC distribution power systems are capable to provide an uninterruptible delivery of current. In addition the effects on energy management of the DC distribution power systems, which include energy storages, were studied. Also a hierarchical principle was brought out, which could make an efficient interaction between electricity market and distributed power systems. Economical studies of the simplified 10 kV distribution system were done and the costs of AC and DC networks were compared. At 10 kV level AC system was found to be more economically efficient but DC network is more energy efficient because of remarkable smaller losses. Based on this study it can be said, that if the investment costs of the DC power systems can be reduced it could be a strong competitor to conventional AC power systems. (orig.)

  11. Power quality load management for large spacecraft electrical power systems

    Science.gov (United States)

    Lollar, Louis F.

    1988-01-01

    In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

  12. Handbook of power systems I

    CERN Document Server

    Pardalos, P M; Pereira, Mario V; Iliadis, Niko A

    2010-01-01

    Energy is one of the world's most challenging problems, and power systems are an important aspect of energy-related issues. The Handbook of Power Systems contains state-of-the-art contributions on power systems modeling. In particular, it covers topics like operation planning, expansion planning, transmission and distribution modelling, computing technologies in energy systems, energy auctions, risk management, market regulation, stochastic programming in energy, and forecasting in energy. The book is separated into nine sections, which cover the most important areas of energy systems. The con

  13. Power systems engineering and mathematics

    CERN Document Server

    Knight, U G

    1972-01-01

    Power Systems Engineering and Mathematics investigates the application of mathematical aids, particularly the techniques of resource planning, to some of the technical-economic problems of power systems engineering. Topics covered include the process of engineering design and the use of computers in system design and operation; power system planning and operation; time scales and computation in system operation; and load prediction and generation capacity. This volume is comprised of 13 chapters and begins by outlining the stages in the synthesis of designs (or operating states) for engineerin

  14. Considerations for transient stability, fault capacity and power flow study of offsite power system

    Energy Technology Data Exchange (ETDEWEB)

    Shin, M C; Kim, C W; Gwon, M H; Park, C W; Lee, K W; Kim, H M; Lee, G Y; Joe, P H [Sungkyunkwan Univ., Seoul (Korea, Republic of)

    1994-04-15

    By study of power flow calculation, fault capacity calculation and stability analysis according to connection of two units YGN 3 and 4 to KEPCO power system, we have conclusions as follows. As the result of power flow calculation, at peak load, the voltage change of each bus is very small when YGN 3 and 4 is connected with KEPCO power system. At base load, installation of phase modifing equipment is necessary in Seoul, Kyungki province where load is concentrated because bus voltage rises by increasing of charge capacity caused installation of underground cables. As the result of fault capacity calculation, fault capacity is increased because fault current increases when two units YGN 3 and 4 is connected with KEPCO power system. But it is enough to operate with presenting circuits breaker rated capacity. Transient stability studies have been conducted on the YK N/P generators 3 and 4 using a digital computer program. Three phase short faults have been simulated at the YK N/P 345[KV] bus with the resulting outage of transmission circuits. Several fault clearing times are applied: 6 cycles, 12 cycles, 15 cycles. The study results demonstrate that the transient stability of YK N/P is adequate to maintain stable for three phase short faults cleared within 12 cycles. The study results also demonstrate that the transient stability of YK N/P is stable for machine removals except 4-machine removal. In addition, the study shows that the transient stability analysis is implemented for the case of load.

  15. Reactive power compensating system

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Timothy J. (Redondo Beach, CA); El-Sharkawi, Mohamed A. (Renton, WA); Venkata, Subrahmanyam S. (Seattle, WA)

    1987-01-01

    The reactive power of an induction machine is compensated by providing fixed capacitors on each phase line for the minimum compensation required, sensing the current on one line at the time its voltage crosses zero to determine the actual compensation required for each phase, and selecting switched capacitors on each line to provide the balance of the compensation required.

  16. Reactive Power Compensating System.

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Timothy J.; El-Sharkawi, Mohamed A.; Venkata, Subrahmanyam S.

    1985-01-04

    The circuit was designed for the specific application of wind-driven induction generators. It has great potential for application in any situation where a varying reactive power load is present, such as with induction motors or generators, or for transmission network compensation.

  17. Limits to power system growth

    International Nuclear Information System (INIS)

    Slater, S.M.; Klein, A.C.; Webb, B.J.; Pauley, K.A.

    1993-01-01

    In the design of space nuclear power systems a variety of conversion techniques may be used, each with its own advantages and disadvantages. A study was performed which analyzed over 120 proposed system designs. The designs were compared to identify the optimum conversion system as a function of power level and find limits to specific mass (kg/kWe) for each power cycle. Furthermore, the component masses were studied to determine which component of the overall design contributes the most to total system mass over a variety of power levels. The results can provide a focus for future research efforts by selecting the best conversion technology for the desired power range, and optimizing the system component which contributes most to the total mass

  18. Power system protection 2 systems and methods

    CERN Document Server

    1995-01-01

    The worldwide growth in demand for electricity has forced the pace of developments in electrical power system design to meet consumer needs for reliable, secure and cheap supplies. Power system protection, as a technology essential to high quality supply, is widely recognised as a specialism of growing and often critical importance, in which power system needs and technological progress have combined to result in rapid developments in policy and practice in recent years. In the United Kingdom, the need for appropriate training in power system protection was recognised in the early 1960s with t

  19. Electrical power systems for Mars

    Science.gov (United States)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  20. Impact of advanced wind power ancillary services on power system

    DEFF Research Database (Denmark)

    Hansen, Anca Daniela; Altin, Müfit

    The objective of this report is to illustrate and analyse, by means of simulation test cases, the impact of wind power advanced ancillary services, like inertial response (IR), power oscillation damping (POD) and synchronising power (SP) on the power system. Generic models for wind turbine, wind...... power plant and power system are used in the investigation....

  1. Design and Control of a 13.2 kV/10 kVA Single-Phase Solid-State-Transformer with 1.7 kV SiC Devices

    Directory of Open Access Journals (Sweden)

    Jeong-Woo Lim

    2018-01-01

    Full Text Available This paper describes the power stage design, control, and performance evaluation of a 13.2 kV/10 kVA solid-state-transformer (SST for a power distribution system. The proposed SST consists of 10 modules where each individual module contains a unidirectional three-level power factor correction (PFC converter for the active-front-end (AFE stage and an LLC resonant converter for the isolated DC-DC stage. The operating principles of the converters are analyzed and the modulation and the control schemes for the entire module are described in detail. The DC-link voltage imbalance is also less than other SST topologies due to the low number of uncontrollable switching states. In order to simplify the control of the power stage, a modulation strategy for the AFE stage is proposed, and the modulation frequency of the LLC converter is also fixed. In addition, a compensation algorithm is suggested to eliminate the current measurement offset in the AFE stage. The proposed SST achieves the unity power factor at the input AC current regardless of the reactive or nonlinear load and a low voltage regulation at the AC output. In order to verify the effectiveness of the SST, the 13.2 kV/10 kV SST prototype is built and tested. Both the simulation and the experimental results under actual 13.2 kV line show the excellent performance of the proposed SST scheme.

  2. Power reactor information system (PRIS)

    International Nuclear Information System (INIS)

    1989-06-01

    Since the very beginning of commercial operation of nuclear power plants, the nuclear power industry worldwide has accumulated more than 5000 reactor years of experience. The IAEA has been collecting Operating Experience data for Nuclear Power Plants since 1970 which were computerized in 1980. The Agency has undertaken to make Power Reactor Information System (PRIS) available on-line to its Member States. The aim of this publication is to provide the users of PRIS from their terminals with description of data base and communication systems and to show the methods of accessing the data

  3. Equivalent model and power flow model for electric railway traction network

    Science.gov (United States)

    Wang, Feng

    2018-05-01

    An equivalent model of the Cable Traction Network (CTN) considering the distributed capacitance effect of the cable system is proposed. The model can be divided into 110kV side and 27.5kV side two kinds. The 110kV side equivalent model can be used to calculate the power supply capacity of the CTN. The 27.5kV side equivalent model can be used to solve the voltage of the catenary. Based on the equivalent simplified model of CTN, the power flow model of CTN which involves the reactive power compensation coefficient and the interaction of voltage and current, is derived.

  4. Impacts of Wind Power on Power System Stability

    NARCIS (Netherlands)

    Vittal, E.; Keane, A.; Slootweg, J.G.; Kling, W.L.; Ackermann, T.

    2012-01-01

    This chapter examines how wind power will impact the stability of power systems. It focuses on the three aspects of power system stability: voltage stability, rotor angle stability and frequency stability. It completes a detailed analysis as to how wind power in power systems will impact the

  5. Low voltage 80 KV to 125 KV electron processors

    International Nuclear Information System (INIS)

    Lauppi, U.V.

    1999-01-01

    The classic electron beam technology made use of accelerating energies in the voltage range of 300 to 800 kV. The first EB processors - built for the curing of coatings - operated at 300 kV. The products to be treated were thicker than a simple layer of coating with thicknesses up to 100g and more. It was only in the beginning of the 1970's that industrial EB processors with accelerating voltages below 300 kV appeared on the market. Our company developed the first commercial electron accelerator without a beam scanner. The new EB machine featured a linear cathode, emitting a shower or 'curtain' of electrons over the full width of the product. These units were much smaller than anv previous EB processors and dedicated to the curing of coatings and other thin layers. ESI's first EB units operated with accelerating voltages between 150 and 200 kV. In 1993 ESI announced the introduction of a new generation of Electrocure. EB processors operating at 120 kV, and in 1998, at the RadTech North America '98 Conference in Chicago, the introduction of an 80 kV electron beam processor under the designation Microbeam LV

  6. Electrical power system WP-04

    Science.gov (United States)

    Nored, Donald L.

    1990-01-01

    Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.

  7. Autonomously managed high power systems

    International Nuclear Information System (INIS)

    Weeks, D.J.; Bechtel, R.T.

    1985-01-01

    The need for autonomous power management capabilities will increase as the power levels of spacecraft increase into the multi-100 kW range. The quantity of labor intensive ground and crew support consumed by the 9 kW Skylab cannot be afforded in support of a 75-300 kW Space Station or high power earth orbital and interplanetary spacecraft. Marshall Space Flight Center is managing a program to develop necessary technologies for high power system autonomous management. To date a reference electrical power system and automation approaches have been defined. A test facility for evaluation and verification of management algorithms and hardware has been designed with the first of the three power channel capability nearing completion

  8. Evaluation of cooperation WPP and PV connected through the shared transformer to the network 22kV

    Directory of Open Access Journals (Sweden)

    Tomas Sumbera

    2012-01-01

    Full Text Available The article deals with evaluation the cooperation possibility of wind and solar power plants connected through the common transformator to the 22kV network. Cooperation evaluation is, based on measured data, for wind power plant about installed capacity 2MW and for solar power plant about installed capacity 1,1MWp. In the next part of this article there is the analysis of suitable localities for construction of „hybrid system (WPP+PV“ in the Czech Republic. The last part of the article deals with analysis of active power fluctuation of individuals electric sources compared with system WPP+PV and with evaluation the effects after system connection WPP+PV to the 22kV network.

  9. Power generation systems and methods

    Science.gov (United States)

    Jones, Jack A. (Inventor); Chao, Yi (Inventor)

    2011-01-01

    A power generation system includes a plurality of submerged mechanical devices. Each device includes a pump that can be powered, in operation, by mechanical energy to output a pressurized output liquid flow in a conduit. Main output conduits are connected with the device conduits to combine pressurized output flows output from the submerged mechanical devices into a lower number of pressurized flows. These flows are delivered to a location remote of the submerged mechanical devices for power generation.

  10. Power turbine ventilation system

    Science.gov (United States)

    Wakeman, Thomas G. (Inventor); Brown, Richard W. (Inventor)

    1991-01-01

    Air control mechanism within a power turbine section of a gas turbine engine. The power turbine section includes a rotor and at least one variable pitch propulsor blade. The propulsor blade is coupled to and extends radially outwardly of the rotor. A first annular fairing is rotatable with the propulsor blade and interposed between the propulsor blade and the rotor. A second fairing is located longitudinally adjacent to the first fairing. The first fairing and the second fairing are differentially rotatable. The air control mechanism includes a platform fixedly coupled to a radially inner end of the propulsor blade. The platform is generally positioned in a first opening and a first fairing. The platform and the first fairing define an outer space. In a first position corresponding with a first propulsor blade pitch, the platform is substantially conformal with the first fairing. In a second position corresponding with the second propulsor blade pitch, an edge portion of the platform is displaced radially outwardly from the first fairing. When the blades are in the second position and rotating about the engine axis, the displacement of the edge portion with respect to the first fairing allows air to flow from the outer space to the annular cavity.

  11. Protection of industrial power systems

    CERN Document Server

    DAVIES, T

    2006-01-01

    The protection which is installed on an industrial power system is likely to be subjected to more difficult conditions than the protection on any other kind of power system. Starting with the many simple devices which are employed and covering the whole area of industrial power system protection, this book aims to help achieve a thorough understanding of the protection necessary.Vital aspects such as the modern cartridge fuse, types of relays, and the role of the current transformer are covered and the widely used inverse definite-minimum time overcurrent relay, the theory of the M

  12. Photovoltaic power system reliability considerations

    Science.gov (United States)

    Lalli, V. R.

    1980-01-01

    This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

  13. Optimization of power system operation

    CERN Document Server

    Zhu, Jizhong

    2015-01-01

    This book applies the latest applications of new technologies topower system operation and analysis, including new and importantareas that are not covered in the previous edition. Optimization of Power System Operation covers both traditional andmodern technologies, including power flow analysis, steady-statesecurity region analysis, security constrained economic dispatch,multi-area system economic dispatch, unit commitment, optimal powerflow, smart grid operation, optimal load shed, optimalreconfiguration of distribution network, power system uncertaintyanalysis, power system sensitivity analysis, analytic hierarchicalprocess, neural network, fuzzy theory, genetic algorithm,evolutionary programming, and particle swarm optimization, amongothers. New topics such as the wheeling model, multi-areawheeling, the total transfer capability computation in multipleareas, are also addressed. The new edition of this book continues to provide engineers andac demics with a complete picture of the optimization of techn...

  14. Solar cell power source system

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Yoichi; Toma, Kunio; Fukuwa, Shinji

    1988-05-14

    This invention aims to supply a power source system with stable power output by reducing the power loss due to switching in the voltage stabilization even when the power source is a solar cell with frequent voltage variation. For this purpose, in a solar cell power source system consisting of a solar cell, a storage battery, a switching regulator placed between the storage cell and the load, and a load, arrangement was made that, by judging the input voltage from the storage battery, switch-acting the transistor of the switching regulator, if the input voltage is higher than the specified voltage; is the input voltage is lower than the specified voltage, the transistor is put in a full-on state. By this, the supply voltage can be stabilized even when the voltage fluctuates, and system gets more efficient as the switching loss decreases in the voltage stabilizing means. (1 fig)

  15. Charging system of ECRH high-voltage power supply and its control system

    International Nuclear Information System (INIS)

    Hu Guofu; Ding Tonghai; Liu Baohua; Jiang Shufang

    2003-01-01

    High-voltage power supply (HVPS) of Electron Cyclotron Resonance Heating (ECRH) for HT-7 and HT-7U is presently being constructed. The high voltage (100 kV) energy of HVPS is stored in the capacitor banks, and they can power one or two gyrotrons. All the operation of the charging system will be done by the control system, where the field signals are interfaced to programmable logic controller (PLC). The use of PLC not only simplifies the control system, but also enhances the reliability. The software written by using configuration software installed in the master computer allows for remote and multiple operator control, and the status and data information is also remotely available

  16. Power-supply system for high-voltage electron guns with grid control

    International Nuclear Information System (INIS)

    Grigorev, Y.V.

    1985-01-01

    A power-supply system for electron guns with grid control is described which consists of a source of accelerating voltage between 20 and 180 kV with a current of 100 mA and a control circuit for an electron gun that contains a pulse generator having an output voltage of up to 5 kV for pulse durations of 2, 10, 50 and 90 microseconds. The output pulses of the generator are synchronized with a certain phase of the cathode heater current of the gun, and they can be repeated at a frequency between 100 and 0.4 Hz. The system is reliable and resistant to the overloads associated with breakdowns in the gun

  17. Power Systems Integration Laboratory | Energy Systems Integration Facility

    Science.gov (United States)

    | NREL Power Systems Integration Laboratory Power Systems Integration Laboratory Research in the Energy System Integration Facility's Power Systems Integration Laboratory focuses on the microgrid applications. Photo of engineers testing an inverter in the Power Systems Integration Laboratory

  18. Radioisotope Power Systems Technology Development

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal of the RPS's technology portfolio is to advance performance of radioisotope power systems through new and novel innovations being developed and transitioned...

  19. Auxiliary System Load Schemes in Large Thermal and Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kuzle, I.; Bosnjak, D.; Pandzic, H.

    2010-01-01

    Uninterrupted auxiliary system power supply in large power plants is a key factor for normal operation, transient states, start-ups and shutdowns and particularly during fault conditions. Therefore, there are many challenges in designing the main electrical system as well as the auxiliary systems power supply. Depending upon the type of fuel used and the environmental control system required, a thermal power plant may consume as much as 10% of its total generation for auxiliary power, while a nuclear power plant may require only 4 - 6% auxiliaries. In general, the larger the power generating plant, the higher the voltage selected for the AC auxiliary electric system. Most stations in the 75 to 500 MW range utilize 4,2 kV as the base auxiliary system voltage. Large generating stations 500 - 1000 MW and more use voltage levels of 6,9 kV and more. Some single dedicated loads such as electric driven boiler feed pumps are supplied ba a 13,8 kV bus. While designing the auxiliary electric system, the following areas must be considered: motor starting requirements, voltage regulation requirements, short-circuit duty requirements, economic considerations, reliability and alternate sources. Auxiliary power supply can't be completely generalized and each situation should be studied on its own merits to determine the optimal solution. Naturally, nuclear power plants have more reliability requirements and safety design criteria. Main coolant-pump power supply and continuity of service to other vital loads deserve special attention. This paper presents an overview of some up-to-date power plant auxiliary load system concepts. The main types of auxiliary loads are described and the electric diagrams of the modern auxiliary system supply concepts are given. Various alternative sources of auxiliary electrical supply are considered, the advantages and disadvantages of these are compared and proposals are made for high voltage distribution systems around the thermal and nuclear plant

  20. Solar power satellite system; Uchu hatsuden system

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, S [Institute of Space and Astronautical Science, Tokyo (Japan)

    1995-09-05

    The solar power satellite system is a system that converts solar energy into electric energy in the space, transmits power to earth through wireless resort such as microwave and supplies energy of new concept. In order to realize this system it is necessary to have new technologies such as space power transmission at low cost, construction of large space buildings and wireless high power transmission. In this paper, the principles, characteristics and the necessary technology of this system were explained. Besides Japan`s SPS2000 Plan (cooperative research by universities, government agencies and private corporations on the model of solar power satellite) the group of Europe, Russia and the United States has also proposed some ideas concerning the solar power satellite system. As far as the microwave power transmission, which is the key technology for solar power satellite system, is concerned, ground demonstration tests at the level of several tens of kW are discussed in Canada and France. 3 refs., 3 figs.

  1. Wind farm - A power source in future power systems

    DEFF Research Database (Denmark)

    Chen, Zhe; Blaabjerg, Frede

    2009-01-01

    wind turbines and wind farms, and then introduces the wind power development and wind farms. An optimization platform for designing electrical systems of offshore wind farms is briefed. The major issues related to the grid connection requirements and the operation of wind turbines/farms in power......The paper describes modern wind power systems, introduces the issues of large penetration of wind power into power systems, and discusses the possible methods of making wind turbines/farms act as a power source, like conventional power plants in power systems. Firstly, the paper describes modern...... systems are illustrated....

  2. The stability of mechanical calibration for a kV cone beam computed tomography system integrated with linear accelerator

    International Nuclear Information System (INIS)

    Sharpe, Michael B.; Moseley, Douglas J.; Purdie, Thomas G.

    2006-01-01

    The geometric accuracy and precision of an image-guided treatment system were assessed. Image guidance is performed using an x-ray volume imaging (XVI) system integrated with a linear accelerator and treatment planning system. Using an amorphous silicon detector and x-ray tube, volumetric computed tomography images are reconstructed from kilovoltage radiographs by filtered backprojection. Image fusion and assessment of geometric targeting are supported by the treatment planning system. To assess the limiting accuracy and precision of image-guided treatment delivery, a rigid spherical target embedded in an opaque phantom was subjected to 21 treatment sessions over a three-month period. For each session, a volumetric data set was acquired and loaded directly into an active treatment planning session. Image fusion was used to ascertain the couch correction required to position the target at the prescribed iso-center. Corrections were validated independently using megavoltage electronic portal imaging to record the target position with respect to symmetric treatment beam apertures. An initial calibration cycle followed by repeated image-guidance sessions demonstrated the XVI system could be used to relocate an unambiguous object to within less than 1 mm of the prescribed location. Treatment could then proceed within the mechanical accuracy and precision of the delivery system. The calibration procedure maintained excellent spatial resolution and delivery precision over the duration of this study, while the linear accelerator was in routine clinical use. Based on these results, the mechanical accuracy and precision of the system are ideal for supporting high-precision localization and treatment of soft-tissue targets

  3. Power Systems Advanced Research

    Energy Technology Data Exchange (ETDEWEB)

    California Institute of Technology

    2007-03-31

    In the 17 quarters of the project, we have accomplished the following milestones - first, construction of the three multiwavelength laser scattering machines for different light scattering study purposes; second, build up of simulation software package for simulation of field and laboratory particulates matters data; third, carried out field online test on exhaust from combustion engines with our laser scatter system. This report gives a summary of the results and achievements during the project's 16 quarters period. During the 16 quarters of this project, we constructed three multiwavelength scattering instruments for PM2.5 particulates. We build up a simulation software package that could automate the simulation of light scattering for different combinations of particulate matters. At the field test site with our partner, Alturdyne, Inc., we collected light scattering data for a small gas turbine engine. We also included the experimental data feedback function to the simulation software to match simulation with real field data. The PM scattering instruments developed in this project involve the development of some core hardware technologies, including fast gated CCD system, accurately triggered Passively Q-Switched diode pumped lasers, and multiwavelength beam combination system. To calibrate the scattering results for liquid samples, we also developed the calibration system which includes liquid PM generator and size sorting instrument, i.e. MOUDI. In this report, we give the concise summary report on each of these subsystems development results.

  4. CANDU nuclear power system

    International Nuclear Information System (INIS)

    1981-01-01

    This report provides a summary of the components that make up a CANDU reactor. Major emphasis is placed on the CANDU 600 MW(e) design. The reasons for CANDU's performance and the inherent safety of the system are also discussed

  5. High power lasers & systems

    OpenAIRE

    Chatwin, Chris; Young, Rupert; Birch, Philip

    2015-01-01

    Some laser history;\\ud Airborne Laser Testbed & Chemical Oxygen Iodine Laser (COIL);\\ud Laser modes and beam propagation;\\ud Fibre lasers and applications;\\ud US Navy Laser system – NRL 33kW fibre laser;\\ud Lockheed Martin 30kW fibre laser;\\ud Conclusions

  6. Economic Operation of Power Systems with Significant Wind Power Penetration

    DEFF Research Database (Denmark)

    Farashbashi-Astaneh, Seyed-Mostafa

    This dissertation addresses economic operation of power systems with high penetration of wind power. Several studies are presented to address the economic operation of power systems with high penetration of variable wind power. The main concern in such power systems is high variability...... and unpredictability. Unlike conventional power plants, the output power of a wind farm is not controllable. This brings additional complexity to operation and planning of wind dominant power systems. The key solution in face of wind power uncertainty is to enhance power system flexibility. The enhanced flexibility......, cooperative wind-storage operation is studied. Lithium-Ion battery units are chosen as storage units. A novel formulation is proposed to investigate optimal operation of a storage unit considering power system balancing conditions and wind power imbalances. An optimization framework is presented to increase...

  7. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  8. Diversification criteria for power systems

    International Nuclear Information System (INIS)

    Kharbach, Mohammed

    2016-01-01

    Growing power demand, fuel availability and prices, technology changes, the environmental impacts of energy consumption, the changing regulatory environments and the uncertainties around such elements make the planning for optimal power mix a challenging task. The diversity approach is advocated as a most appropriate planning methodology for the optimal energy mix (Hickey et al., 2010). Shannon Wiener Index (SWI), which is the most cited diversity metric has been used to assess power systems diversity mainly from an energy perspective. To our best knowledge, there is no rigorous justification why energy has been the main variable used in diversification exercises rather than other variables such as capacity. We use a stylized power generation framework to show that diversity based on energy or capacity could lead to different outcomes in terms of vulnerability to fuel exposure, among others. We also introduce a Shannon Wiener Index ratio (SWIR) that we believe captures better the diversity of a power system compared to the standard SWI. - Highlights: • Ranking power systems, from a diversity perspective, based on one criteria has many shortcomings. • Diversity based on energy or capacity could lead to different outcomes in terms of vulnerability to fuel exposure, among others. • A Shannon Wiener Index ratio (SWIR) captures better the diversity of a power system compared to the standard SWI.

  9. Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems, EMTDC/PSCAD Relays Modelling

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Sztykiel, Michal; Dollerup, Sebastian

    2011-01-01

    Based on the analysis of a specific relay model and an HVAC (High Voltage Alternating Current) cable system, a new approach to EMTDC/PSCAD modelling of protective relays is presented. Such approach allows creating complex and accurate relay models derived from the original algorithms. Relay models...... can be applied with various systems, allowing obtaining the most optimal configuration of the protective relaying. The present paper describes modelling methodology on the basis of Siemens SIPROTEC 4 7SD522/610. Relay model was verified experimentally with its real equivalent by both EMTP......-simulated and real world generated current signals connected to the relay....

  10. Brayton cycle space power systems

    International Nuclear Information System (INIS)

    Pietsch, A.; Trimble, S.W.; Harper, A.D.

    1985-01-01

    The latest accomplishments in the design and development of the Brayton Isotope Power System (BIPS) for space applications are described, together with a reexamination of the design/cost tradeoffs with respect to current economic parameters and technology status. The results of tests performed on a ground test version of the flight configuration, the workhorse loop, were used to confirm the performance projections made for the flight system. The results of cost-model analysis indicate that the use of the highest attainable power conversion system efficiency will yield the most cost-effective systems. 13 references

  11. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  12. Electric power system applications of optimization

    CERN Document Server

    Momoh, James A

    2008-01-01

    Introduction Structure of a Generic Electric Power System  Power System Models  Power System Control Power System Security Assessment  Power System Optimization as a Function of Time  Review of Optimization Techniques Applicable to Power Systems Electric Power System Models  Complex Power Concepts Three-Phase Systems Per Unit Representation  Synchronous Machine Modeling Reactive Capability Limits Prime Movers and Governing Systems  Automatic Gain Control Transmission Subsystems  Y-Bus Incorporating the Transformer Effect  Load Models  Available Transfer Capability  Illustrative Examples  Power

  13. Computer-aided analysis of power-electronic systems simulation of a high-voltage power converter

    International Nuclear Information System (INIS)

    Bordry, F.; Isch, H.W.; Proudlock, P.

    1987-01-01

    In the study of semiconductor devices, simulation methods play an important role in both the design of systems and the analysis of their operation. The authors describe a new and efficient computer-aided package program for general power-electronic systems. The main difficulty when taking into account non-linear elements, such as semiconductors, lies in determining the existence and the relations of the elementary sequences defined by the conduction or nonconduction of these components. The method does not require a priori knowledge of the state sequences of the semiconductor nor of the commutation instants, but only the circuit structure, its parameters and the commands to the controlled switches. The simulation program computes automatically both transient and steady-state waveforms for any circuit configuration. The simulation of a high-voltage power converter is presented, both for its steady-state and transient overload conditions. This 100 kV power converter (4 MW) will feed two klystrons in parallel

  14. Solar-Powered Refrigeration System

    Science.gov (United States)

    Ewert, Michael K. (Inventor); Bergeron, David J., III (Inventor)

    2002-01-01

    A solar powered vapor compression refrigeration system is made practicable with thermal storage and novel control techniques. In one embodiment, the refrigeration system includes a photovoltaic panel, a variable speed compressor, an insulated enclosure, and a thermal reservoir. The photovoltaic (PV) panel converts sunlight into DC (direct current) electrical power. The DC electrical power drives a compressor that circulates refrigerant through a vapor compression refrigeration loop to extract heat from the insulated enclosure. The thermal reservoir is situated inside the insulated enclosure and includes a phase change material. As heat is extracted from the insulated enclosure, the phase change material is frozen, and thereafter is able to act as a heat sink to maintain the temperature of the insulated enclosure in the absence of sunlight. The conversion of solar power into stored thermal energy is optimized by a compressor control method that effectively maximizes the compressor's usage of available energy. A capacitor is provided to smooth the power voltage and to provide additional current during compressor start-up. A controller monitors the rate of change of the smoothed power voltage to determine if the compressor is operating below or above the available power maximum, and adjusts the compressor speed accordingly. In this manner, the compressor operation is adjusted to convert substantially all available solar power into stored thermal energy.

  15. Power system stabilizer control for wind power to enhance power system stability

    OpenAIRE

    Domínguez García, José Luís; Gomis Bellmunt, Oriol; Bianchi, Fernando Daniel; Sumper, Andreas

    2011-01-01

    The paper presents a small signal stability analysis for power systems with wind farm interaction. Power systems have damping oscillation modes that can be excited by disturbance or fault in the grid. The power converters of the wind farms can be used to reduce these oscillations and make the system more stable. These ideas are explored to design a power system stabilized (PSS) for a network with conventional generators and a wind farm in order to increase the damping of the oscillation...

  16. Power Quality in DC Power Distribution Systems and Microgrids

    Directory of Open Access Journals (Sweden)

    Stephen Whaite

    2015-05-01

    Full Text Available This review paper discusses power quality considerations for direct current (DC electric power distribution systems, particularly DC microgrids. First, four selected sample DC architectures are discussed to provide motivation for the consideration of power quality in DC systems. Second, a brief overview of power quality challenges in conventional alternating current (AC distribution systems is given to establish the field of power quality. Finally, a survey of literature addressing power quality issues in DC systems is presented, and necessary power quality considerations in DC distribution system design and operation are discussed.

  17. Single-phase AutoReClosure ARC failure on 400 kV combinedcable/overhead line with permanently connected shunt reactor

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Søgaard, Kim

    2008-01-01

    400 kV power system and initiated by Danish TSO Energinet.dk after having measured the voltage of the cable/overhead line after disconnection. A particular decaying dynamic phase voltage containing voltages higher than the voltage before disconnection appeared. A simulation model for the entire system...

  18. Recent space nuclear power systems

    International Nuclear Information System (INIS)

    Takizuka, Takakazu; Yasuda, Hideshi; Hishida, Makoto

    1991-01-01

    For the advance of mankind into the space, the power sources of large output are indispensable, and it has been considered that atomic energy is promising as compared with solar energy and others. Accordingly in USA and USSR, the development of the nuclear power generation systems for space use has been carried out since considerable years ago. In this report, the general features of space nuclear reactors are shown, and by taking the system for the SP-100 project being carried out in USA as the example, the contents of the recent design regarding the safety as an important factor are discussed. Moreover, as the examples of utilizing space nuclear reactors, the concepts of the power source for the base on the moon, the sources of propulsive power for the rockets used for Mars exploration and others, the remote power transmission system by laser in the space and so on are explained. In September, 1988, the launching of a space shuttle of USA was resumed, and the Jupiter explorer 'Galileo' and the space telescope 'Hubble' were successfully launched. The space station 'Mir' of USSR has been used since February, 1986. The history of the development of the nuclear power generation systems for space use is described. (K.I.)

  19. Deteksi Jarak Lokasi Gangguan Pada Saluran Transmisi 500 Kv Cilegon Baru - Cibinong Menggunakan Adaptive Neuro Fuzzy Inference System (ANFIS

    Directory of Open Access Journals (Sweden)

    Muhamad Otong

    2017-06-01

    Full Text Available Pada saluran transmisi diperlukan metode deteksi lokasi gangguan yang akurat dan cepat untuk mengurangi waktu pencarian, sehingga mempercepat proses perbaikan. Dengan menggunakan kombinasi metode Transformasi Park dan Adaptive Neuro Fuzzy Inference System (ANFIS, dapat dideteksi jarak lokasi gangguan secara langsung setelah terjadinya gangguan dengan cara menganalisa gelombang berjalan pada saluran transmisi. Saat terjadi gangguan, akan menyebabkan timbulnya gelombang berjalan yang berupa tegangan dan arus. Tegangan dan arus ini akan ditransformasikan oleh transformasi park pada kedua ujung saluran untuk mendapatkan waktu kedatangan gelombang berjalan, yang mana terdapat perbedaan waktu pada tiap ujung saluran dikarenakan adanya perbedaan jarak yang ada. Perbedaan waktu ini akan di input kedalam ANFIS untuk mendapatkan jarak lokasi gangguan. Dengan membandingkan jumlah nilai keanggotaan dan pemilihan input, maka diperoleh desain ANFIS terbaik adalah dengan jumlah nilai keanggotaan (MF 5 serta input perbedaan waktu ∆tV dan ∆tI (V dan I dengan nilai Mean Absolute Error (MAE sebesar 1,33.

  20. Reliability evaluation of power systems

    CERN Document Server

    Billinton, Roy

    1996-01-01

    The Second Edition of this well-received textbook presents over a decade of new research in power system reliability-while maintaining the general concept, structure, and style of the original volume. This edition features new chapters on the growing areas of Monte Carlo simulation and reliability economics. In addition, chapters cover the latest developments in techniques and their application to real problems. The text also explores the progress occurring in the structure, planning, and operation of real power systems due to changing ownership, regulation, and access. This work serves as a companion volume to Reliability Evaluation of Engineering Systems: Second Edition (1992).

  1. Wind-powered aqueduct systems

    Energy Technology Data Exchange (ETDEWEB)

    Eldridge, F R; Ljungstroem, O [ed.

    1976-01-01

    The MITRE Corporation is proposing to develop a preliminarydesign for a system that would use large-scale wind-driven units to provide power for the pumping of water from the main reservoir to auxiliary reservoirs in other parts of an aqueduct system. The study would include a comparison of the cost and effectiveness of alternative methods of performing such operations.

  2. Mechanosensitive gating of Kv channels.

    Directory of Open Access Journals (Sweden)

    Catherine E Morris

    Full Text Available K-selective voltage-gated channels (Kv are multi-conformation bilayer-embedded proteins whose mechanosensitive (MS Popen(V implies that at least one conformational transition requires the restructuring of the channel-bilayer interface. Unlike Morris and colleagues, who attributed MS-Kv responses to a cooperative V-dependent closed-closed expansion↔compaction transition near the open state, Mackinnon and colleagues invoke expansion during a V-independent closed↔open transition. With increasing membrane tension, they suggest, the closed↔open equilibrium constant, L, can increase >100-fold, thereby taking steady-state Popen from 0→1; "exquisite sensitivity to small…mechanical perturbations", they state, makes a Kv "as much a mechanosensitive…as…a voltage-dependent channel". Devised to explain successive gK(V curves in excised patches where tension spontaneously increased until lysis, their L-based model falters in part because of an overlooked IK feature; with recovery from slow inactivation factored in, their g(V datasets are fully explained by the earlier model (a MS V-dependent closed-closed transition, invariant L≥4. An L-based MS-Kv predicts neither known Kv time courses nor the distinctive MS responses of Kv-ILT. It predicts Kv densities (hence gating charge per V-sensor several-fold different from established values. If opening depended on elevated tension (L-based model, standard gK(V operation would be compromised by animal cells' membrane flaccidity. A MS V-dependent transition is, by contrast, unproblematic on all counts. Since these issues bear directly on recent findings that mechanically-modulated Kv channels subtly tune pain-related excitability in peripheral mechanoreceptor neurons we undertook excitability modeling (evoked action potentials. Kvs with MS V-dependent closed-closed transitions produce nuanced mechanically-modulated excitability whereas an L-based MS-Kv yields extreme, possibly excessive

  3. Negative-feedback control system of the high voltage power supply for ECRH

    International Nuclear Information System (INIS)

    Ding Tonghai; Liu Baohua; Jiang Shufang

    2001-01-01

    A kind of high accuracy negative high voltage power supply (HVPS) was introduced. The serial feedback was regulated according to the character of the high power tetrode and a new kind of integrator with preset value, which solved the key technological problem of the HVPS that the ECRH system required a voltage of -80 kV, a pulse width of 10 - 100 ms and a precision of 99.7%. The result using a PSPICE code simulation has shown that the method is practical

  4. Lawrence Berkeley laboratory neutral-beam engineering test facility power-supply system

    International Nuclear Information System (INIS)

    Lutz, I.C.; Arthur, C.A.; deVries, G.J.; Owren, H.M.

    1981-10-01

    The Lawrence Berkeley Laboratory is upgrading the neutral beam source test facility (NBSTF) into a neutral beam engineering test facility (NBETF) with increased capabilities for the development of neutral beam systems. The NBETF will have an accel power supply capable of 170 kV, 70 A, 30 sec pulse length, 10% duty cycle; and the auxiliary power supplies required for the sources. This paper describes the major components, their ratings and capabilities, and the flexibility designed to accomodate the needs of source development

  5. Power Reactor Information System (PRIS)

    International Nuclear Information System (INIS)

    Spiegelberg, R.

    1992-01-01

    The IAEA has been collecting Operating Experience data for Nuclear Power Plants of the IAEA Member States since 1970. In order to facilitate an analysis of nuclear power plant performance as well as to produce relevant publications, all previously collected data supplied from the questionnaires were computerized in 1980 and the Power Reactor Information System was implemented. PRIS currently contains production records for the years up to and including 1990 and about 98% of the reactors-years operating experience in the world is contained in PRIS. (orig.)

  6. Optimization of photovoltaic power systems

    CERN Document Server

    Rekioua, Djamila

    2012-01-01

    Photovoltaic generation is one of the cleanest forms of energy conversion available. One of the advantages offered by solar energy is its potential to provide sustainable electricity in areas not served by the conventional power grid. Optimisation of Photovoltaic Power Systems details explicit modelling, control and optimisation of the most popular stand-alone applications such as pumping, power supply, and desalination. Each section is concluded by an example using the MATLAB(R) and Simulink(R) packages to help the reader understand and evaluate the performance of different photovoltaic syste

  7. Engineering of beam direct conversion for a 120-kV, 1-MW ion beam

    International Nuclear Information System (INIS)

    Barr, W.L.; Doggett, J.N.; Hamilton, G.W.; Kinney, J.D.; Moir, R.W.

    1977-01-01

    Practical systems for beam direct conversion are required to recover the energy from ion beams at high efficiency and at very high beam power densities in the environment of a high-power, neutral-injection system. Such an experiment is now in progress using a 120-kV beam with a maximum total current of 20 A. After neutralization, the H + component to be recovered will have a power of approximately 1MW. A system testing these concepts has been designed and tested at 15 kV, 2 kW in preparation for the full-power tests. The engineering problems involved in the full-power tests affect electron suppression, gas pumping, voltage holding, diagnostics, and measurement conditions. Planning for future experiments at higher power includes the use of cryopumping and electron suppression by a magnetic field rather than by an electrostatic field. Beam direct conversion for large fusion experiments and reactors will save millions of dollars in the cost of power supplies and electricity and will dispose of the charged beam under conditions that may mot be possible by other techniques

  8. Engineering of beam direct conversion for a 120-kV, 1-MW ion beam

    International Nuclear Information System (INIS)

    Barr, W.L.; Doggett, J.N.; Hamilton, G.W.; Kinney, J.D.; Moir, R.W.

    1977-01-01

    Practical systems for beam direct conversion are required to recover the energy from ion beams at high efficiency and at very high beam power densities in the environment of a high-power, neutral-injection system. Such an experiment is now in progress using a 120-kV beam with a maximum total current of 20 A. After neutralization, the H + component to be recovered will have a power of approximately 1 MW. A system testing these concepts has been designed and tested at 15 kV, 2 kW in preparation for the full-power tests. The engineering problems involved in the full-power tests affect electron suppression, gas pumping, voltage holding, diagnostics, and measurement conditions. Planning for future experiments at higher power includes the use of cryopumping and electron suppression by a magnetic field rather than by an electrostatic field. Beam direct conversion for large fusion experiments and reactors will save millions of dollars in the cost of power supplies and electricity and will dispose of the charged beam under conditions that may not be possible by other techniques

  9. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1991-01-01

    This Safety Guide was prepared as part of the Nuclear Safety Standards programme for establishing Codes and Safety Guides relating to nuclear power plants (NPPs). The first edition of the present Safety Guide was developed in the early 1980s. The text has now been brought up-to-date, refined in several details and amended to include non-electrical diverse and independent power sources. This Guide applies to NPP for which the total power supply comprises a normal power supply and an emergency power supply (EPS), which may be electrical or a combination of electrical and non-electrical. The Guide provides general guidance for all types of EPS and specific guidance on the design safety requirements and the features of the electrical and non-electrical portions of the EPS. 9 figs, 2 tabs

  10. Beam Profile Measurement of 300 kV Ion Source Test Stand for 1 MV Electrostatic Accelerator

    International Nuclear Information System (INIS)

    Park, Sae-Hoon; Kim, Yu-Seok; Kim, Dae-Il; Kwon, Hyeok-Jung; Cho, Yong-Sub

    2015-01-01

    In this paper, RF ion source, test stand of the ion source and its test results are presented. Beam profile was measured at the downstream from the accelerating tube and at the beam dump by using BPM and wire scanner. The RF ion source of the test stand is verified by measuring the total beam current with a faraday cup in the chamber. The KOMAC (KOrea Multi-purpose Accelerator Complex) has been developing a 300 kV ion source test stand for a 1 MV electrostatic accelerator. An ion source and accelerating tube will be installed in a high pressure vessel. The ion source in a high pressure vessel requires high reliability. To confirm the stable operation of the ion source, a test stand was proposed and developed. The ion source will be tested at the test stand to verify its long-term operation conditions. The test stand consists of a 300 kV high voltage terminal, a battery for the ion source power, a 60 Hz inverter, a 200 MHz RF power, a 5 kV extraction power supply, a 300 kV accelerating tube, and a vacuum system. The beam profile monitor was installed at the downstream from the accelerating tube. Wire scanner and faraday-cup was installed at the end of the chamber

  11. Beam Profile Measurement of 300 kV Ion Source Test Stand for 1 MV Electrostatic Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sae-Hoon; Kim, Yu-Seok [Dongguk University, Gyeonju (Korea, Republic of); Kim, Dae-Il; Kwon, Hyeok-Jung; Cho, Yong-Sub [Korea Multipurpose Accelerator Complex, Gyeongju (Korea, Republic of)

    2015-10-15

    In this paper, RF ion source, test stand of the ion source and its test results are presented. Beam profile was measured at the downstream from the accelerating tube and at the beam dump by using BPM and wire scanner. The RF ion source of the test stand is verified by measuring the total beam current with a faraday cup in the chamber. The KOMAC (KOrea Multi-purpose Accelerator Complex) has been developing a 300 kV ion source test stand for a 1 MV electrostatic accelerator. An ion source and accelerating tube will be installed in a high pressure vessel. The ion source in a high pressure vessel requires high reliability. To confirm the stable operation of the ion source, a test stand was proposed and developed. The ion source will be tested at the test stand to verify its long-term operation conditions. The test stand consists of a 300 kV high voltage terminal, a battery for the ion source power, a 60 Hz inverter, a 200 MHz RF power, a 5 kV extraction power supply, a 300 kV accelerating tube, and a vacuum system. The beam profile monitor was installed at the downstream from the accelerating tube. Wire scanner and faraday-cup was installed at the end of the chamber.

  12. PowerFactory applications for power system analysis

    CERN Document Server

    Gonzalez-Longatt, Francisco

    2014-01-01

    This book presents a comprehensive set of guidelines and applications of DIgSILENT PowerFactory, an advanced power system simulation software package, for different types of power systems studies. Written by specialists in the field, it combines expertise and years of experience in the use of DIgSILENT PowerFactory with a deep understanding of power systems analysis. These complementary approaches therefore provide a fresh perspective on how to model, simulate and analyse power systems. It presents methodological approaches for modelling of system components, including both classical and non-

  13. Facing the challenges of distribution systems operation with high wind power penetration

    DEFF Research Database (Denmark)

    Das, Kaushik; Altin, Müfit; Hansen, Anca Daniela

    2017-01-01

    power flow in 60kV distribution networks through controlling the ability of wind power plants (WPPs) to generate or absorb reactive power. This paper aims to understand the characteristics of a distribution network with high penetration of distributed generation. A detailed analysis of the active...... and reactive power flows in a real distribution network under different wind and load conditions based on actual measurements is performed in order to understand the correlation between the consumption, wind power production, and the network losses. Conclusive remarks are presented, briefly expressing......This paper addresses the challenges associated with the operation of a distribution system with high penetration of wind power. The paper presents some preliminary investigations of an ongoing Danish research work, which has as main objective to reduce the network losses by optimizing the reactive...

  14. The BPX electrical power system

    International Nuclear Information System (INIS)

    Huttar, D.; Bronnev, G.; Fromm, N.

    1992-01-01

    This paper reports on the Burning Plasma Experiment (BPX) which when operating at a toroidal field of 8.1 tesla and a plasma current of 10.6 megamps, requires peak power of 1235 megawatts and total pulse energy of over 21 gigajoules. These requirements are twice and over four times the corresponding figures for the Tokamak Fusion Test Reactor (TFTR), respectively. The design of the BPX power system has evolved, along with the tokamak, over a period of several years and has included studies of several alternative approaches. The reapplication of the existing TFTR power and energy facilities has been basic to all approaches. Among the new sources of pulse power and energy that have been considered are: direct utility grid pulsing, new flywheel units, and lead-acid storage batteries. The toroidal field power requirements are the greatest of the BPX subsystems and, fortunately, are sufficiently free of dynamics to allow the consideration of all approaches. Additional design challenges were presented by the multiplicity of plasma control scenarios incorporated in the BPX physics planning and the power response demanded of the plasma position control system

  15. Power system for tokamak fusion experiments. Motor generator with flywheel effect

    International Nuclear Information System (INIS)

    Miyachi, Kengo

    1997-01-01

    JT-60 requires an enormous electric power pulse about 1,300 MVA periodically for its plasma initiation, containment and heating. JT-60 could not receive all electric power from a commercial line for plasma experiment except about 160 MVA because the 275 kV commercial line has some limitations. Therefore JT-60 needs huge electric power sources. The power supply system of JT-60 has 3 motor generators (MG). The total capacity of MG is 1,115 MVA that consists of a toroidal MG (TMG), poloidal MG (PMG) and Heating power supply MG (HMG), and each MG has a huge flywheel effect. For example, TMG has a 4.02 GJ energy yield that consists of 6 disk flywheel. The total weight of flywheel of TMG is 650 ton. This report describes the structure, operating system, and maintenance history of 3 types of MG. (author)

  16. Continuous hydrino thermal power system

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Randell L.; Zhao, Guibing; Good, William [BlackLight Power, Inc., 493 Old Trenton Road, Cranbury, NJ 08512 (United States)

    2011-03-15

    The specifics of a continuous hydrino reaction system design are presented. Heat from the hydrino reactions within individual cells provide both reactor power and the heat for regeneration of the reactants. These processes occur continuously and the power from each cell is constant. The conversion of thermal power to electrical power requires the use of a heat engine exploiting a cycle such as a Rankine, Brayton, Stirling, or steam-engine cycle. Due to the temperatures, economy goal, and efficiency, the Rankine cycle is the most practical and can produce electricity at 30-40% efficiency with a component capital cost of about $300 per kW electric. Conservatively, assuming a conversion efficiency of 25% the total cost with the addition of the boiler and chemical components is estimated at $1064 per kW electric. (author)

  17. Power Management for Energy Systems

    DEFF Research Database (Denmark)

    Hovgaard, Tobias Gybel

    In this thesis, we consider the control of two different industrial applications that belong at either end of the electricity grid; a power consumer in the form of a commercial refrigeration system, and wind turbines for power production. Our primary studies deal with economic model predictive...... penetration of renewable, fossil-free energy sources such as solar and wind power. To facilitate such intermittent power producers, we must not only control the production of electricity, but also the consumption, in an ecient and exible manner. By enabling the use of thermal energy storage in supermarkets...... of temperature dependent efficiencies in the refrigeration cycle. -Nonlinear economic MPC with uncertain predictions and the implementation of very simple predictors that use entirely historical data of, e.g., electricity prices and outdoor temperatures. Economic MPC for wind turbines, including -Optimal steady...

  18. Continuous hydrino thermal power system

    International Nuclear Information System (INIS)

    Mills, Randell L.; Zhao, Guibing; Good, William

    2011-01-01

    The specifics of a continuous hydrino reaction system design are presented. Heat from the hydrino reactions within individual cells provide both reactor power and the heat for regeneration of the reactants. These processes occur continuously and the power from each cell is constant. The conversion of thermal power to electrical power requires the use of a heat engine exploiting a cycle such as a Rankine, Brayton, Stirling, or steam-engine cycle. Due to the temperatures, economy goal, and efficiency, the Rankine cycle is the most practical and can produce electricity at 30-40% efficiency with a component capital cost of about $300 per kW electric. Conservatively, assuming a conversion efficiency of 25% the total cost with the addition of the boiler and chemical components is estimated at $1064 per kW electric.

  19. Power system studies of new ancillary services

    DEFF Research Database (Denmark)

    Hansen, Anca Daniela; Altin, Müfit

    The objective of this report is to illustrate and analyse, by means of simulation test cases, the impact of wind power advanced ancillary services, like inertial response (IR), power oscillation damping (POD) and synchronising power (SP) on the power system. Generic models for wind turbine, wind...... power plant and power system are used in the investigation....

  20. The first 100 Mw Brazil - Argentina interconnection. The design of the 500/525 Kv Rincon de Santa Maria-Garabi-Ita power transmission line; Primeira interconexao 1000 MW Brasil-Argentina. Projeto da LT 500/525 kV Rincon de Santa Maria-Garabi-Ita

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Joao Batista Guimaraes Ferreira da; Guimaraes, Rogerio Peixoto; Menezes, Luciene Oliveira; Amaro, Rania Carla Peixoto [ABB, Belo Horizonte, MG (Brazil)]. E-mail: joao-batista.ferreira@br.abb.com; Silva, Vilson Renato da [Engelineas Consultoria e Projetos Ltda., Porto Alegre, RS (Brazil); Menezes, Ruy Carlos Ramos de [Rio Grande do Sul Univ., Porto Alegre, RS (Brazil); Nolasco, Joao Felix [JFNolasco Consultoria Ltda., Belo Horizonte, MG (Brazil); Bugallo, Francisco [Companhia de Interconexao Energetica (CIEN), Rio de Janeiro, RJ (Brazil)

    2001-07-01

    This document reports the main design aspects and also displays how the implantation challenges had been overcome in relation to the Brazil-Argentina energetic first interconnection, through the frequency converter station in Garabi and the 500 Kv / 50 Hz Rincon de Santa Maria-Garabi transmission line and 500 Kv / 60 Hz Garabi-Ita transmission line, resulting in a total of 490 Kilometers. Firstly, it is presented the basic design characteristics involving the drawing definitions and electrical parameters determination. Afterwards, are presented the transmission line mechanical aspects, as well as the main obtained results. Finally, the project technical viability and the reached benefits had been discussed as well.

  1. PLTS Transformerless Tegangan 20 kV menggunakan Cascaded H-Bridge Multilevel Inverter

    Directory of Open Access Journals (Sweden)

    ANGGARA BRAJAMUSTHI

    2018-03-01

    Full Text Available ABSTRAK Aplikasi dari inverter multilevel pada sistem Pusat Listrik Tenaga Surya (PLTS dapat menghilangkan kebutuhan terhadap transformator, sehingga dapat mengurangi biaya investasi, mengurangi kompleksitas instalasi dan menghilangkan rugi-rugi daya transformator. Pada penelitian ini, sebuah inverter dengan topologi Cascaded H-Bridge Multilevel Inverter dirancang agar mampu mengubah tegangan rendah DC dari beberapa Photovoltaic (PV array menjadi tegangan fasa-fasa 20 kV AC. Perancangan menghasilkan sebuah inverter 3 fasa 27-level dimana setiap level masing-masing memiliki PV array, DC-DC boost converter, H-bridge inverter, dan keluaran 3 fasa terhubung dengan filter LCL. Setiap komponen dari inverter dan sistem tersebut kemudian dimodelkan pada MATLAB Simulink untuk mensimulasikan kinerja dari setiap komponen dan sistem pada Standard Test Condition (STC dari modul PV. Pada keadaan STC, daya 3 fasa maksimum yang dapat dihasilkan adalah 1,716 MW atau 68,54% dari daya DC maksimum sebesar 2,5 MWp. Sistem dapat menghasilkan tegangan fasa-fasa keluaran sebesar 20 kV dengan Total Harmonic Distortion (THD di bawah 5%. Kata kunci: Pusat Listrik Tenaga Surya (PLTS, photovoltaic, Cascaded H-Bridge Multilevel Inverter ABSTRACT The application of Multilevel Inverter in a Photovoltaic Solar Power Plant system could eliminate the needs of step-up transformer, which will reduce the system investment cost, simplify the system installation and also eliminate power losses of the transformer. In this paper, an inverter design was proposed with Cascaded H-Bridge Multilevel Inverter topology that is capable of converting low voltage DC power from several PV arrays into 20 kV AC power. The design resulted a 3 phase 27-level inverter where each level in the inverter has its own photovoltaic array, DC-DC boost converter, H-bridge inverter, and the 3 phase output is connected to LCL filter. Each component of the Inverter and the system were then modelled in MATLAB

  2. High average power solid state laser power conditioning system

    International Nuclear Information System (INIS)

    Steinkraus, R.F.

    1987-01-01

    The power conditioning system for the High Average Power Laser program at Lawrence Livermore National Laboratory (LLNL) is described. The system has been operational for two years. It is high voltage, high power, fault protected, and solid state. The power conditioning system drives flashlamps that pump solid state lasers. Flashlamps are driven by silicon control rectifier (SCR) switched, resonant charged, (LC) discharge pulse forming networks (PFNs). The system uses fiber optics for control and diagnostics. Energy and thermal diagnostics are monitored by computers

  3. TPX power systems design overview

    International Nuclear Information System (INIS)

    Neumeyer, C.; Bronner, G.; Lu, E.; Ramakrishnan, S.

    1993-01-01

    The power systems for the Tokamak Physics Experiment (TPX) supply the Toroidal Field (TF). Poloidal Field (PF), Field Error Correction (FEC), and Fast Vertical Position Control (FVPC) coil systems, the Neutral Beam (NB), Ion Cyclotron (IC), Lower Hybrid (LH) and Electron Cyclotron (EC) heating and current drive systems, and all balance of plant loads. Existing equipment from the Tokamak Fusion Test Reactor (TFTR), including the motor-generator (MG) sets and the rectifiers, can be adapted for the supply of the TPX PF systems. A new TF power supply is required. A new substation is required for the heating and current drive systems (NB, IC, LH, and EC). The baseline TPX load can be taken directly from the grid without special provision, whereas if all upgrade options are undertaken, a modest amount of reactive compensation will be required. This paper describes the conceptual design of the power systems, with emphasis on the AC, TF, and PF Systems, and the quench protection of the superconducting coils

  4. New 30 kA power system at Fermilab and its use for measuring the effects of ripple current on the performance of superconducting high field magnets

    Energy Technology Data Exchange (ETDEWEB)

    Carcagno, R.; Feher, S.; Garvey, J.; Jaskierny, W.; Lamm, M.; Makulski, A.; Orris, D.F.; Pfeffer, H.; Tartaglia, M.; Tompkins, J.; Wolff, D.; /Fermilab

    2004-12-01

    A new 30 kA, 30 V dc Power System was designed, built, and commissioned at Fermilab for testing Superconducting High Field Magnets. This system has been successfully supporting operations at the Fermilab Magnet Test Facility since April 2002. It is based on six commercial 150 kW Power Energy Industries power supply modules and the following in-house modules: six 720 Hz filters, two 15 kA/1kV dc solid-state dump switch, and a 3 MJ/30 kA/1 kV dc dump resistor. Additional inhouse electronic components were designed and built to provide precise current regulation and distribution of current and current rate of change. An industrial-type Programmable Logic Controller system was used to provide equipment interlocks and monitoring. This paper summarizes studies on the influence of characteristics of this new power system--such as ripple current--on the performance of High Field Superconducting magnets.

  5. Optimal power flow with optimal placement TCSC device on 500 kV Java-Bali electrical power system using genetic Algorithm-Taguchi method

    Science.gov (United States)

    Apribowo, Chico Hermanu Brillianto; Ibrahim, Muhammad Hamka; Wicaksono, F. X. Rian

    2018-02-01

    The growing burden of the load and the complexity of the power system has had an impact on the need for optimization of power system operation. Optimal power flow (OPF) with optimal location placement and rating of thyristor controlled series capacitor (TCSC) is an effective solution used to determine the economic cost of operating the plant and regulate the power flow in the power system. The purpose of this study is to minimize the total cost of generation by placing the location and the optimal rating of TCSC using genetic algorithm-design of experiment techniques (GA-DOE). Simulation on Java-Bali system 500 kV with the amount of TCSC used by 5 compensator, the proposed method can reduce the generation cost by 0.89% compared to OPF without using TCSC.

  6. Estimation of power system variability due to wind power

    NARCIS (Netherlands)

    Papaefthymiou, G.; Verboomen, J.; Van der Sluis, L.

    2007-01-01

    The incorporation of wind power generation to the power system leads to an increase in the variability of the system power flows. The assessment of this variability is necessary for the planning of the necessary system reinforcements. For the assessment of this variability, the uncertainty in the

  7. SU-F-T-667: Development and Validation of Dose Calculation for An Open-Source KV Treatment Planning System for Small Animal Radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Prajapati, S [M D Anderson Cancer Center, Houston, TX (United States); Mo, X; Bednarz, B; Lawless, M; Hammer, C; Jeraj, R; Mackie, T [University of Wisconsin- Madison, Madison, WI (United States); Flynn, R [University of Iowa Hospitals and Clinics, Iowa City, IA (United States); Westerly, D [University of Colorado Denver, Aurora, CO (United States)

    2016-06-15

    Purpose: An open-source, convolution/superposition based kV-treatment planning system(TPS) was developed for small animal radiotherapy from previously existed in-house MV-TPS. It is flexible and applicable to both step and shoot and helical tomotherapy treatment delivery. For initial commissioning process, the dose calculation from kV-TPS was compared with measurements and Monte Carlo(MC) simulations. Methods: High resolution, low energy kernels were simulated using EGSnrc user code EDKnrc, which was used as an input in kV-TPS together with MC-simulated x-ray beam spectrum. The Blue Water™ homogeneous phantom (with film inserts) and heterogeneous phantom (with film and TLD inserts) were fabricated. Phantom was placed at 100cm SSD, and was irradiated with 250 kVp beam for 10mins with 1.1cm × 1.1cm open field (at 100cm) created by newly designed binary micro-MLC assembly positioned at 90cm SSD. Gafchromic™ EBT3 film was calibrated in-phantom following AAPM TG-61 guidelines, and were used for measurement at 5 different depths in phantom. Calibrated TLD-100s were obtained from ADCL. EGS and MNCP5 simulation were used to model experimental irradiation set up calculation of dose in phantom. Results: Using the homogeneous phantom, dose difference between film and kV-TPS was calculated: mean(x)=0.9%; maximum difference(MD)=3.1%; standard deviation(σ)=1.1%. Dose difference between MCNP5 and kV-TPS was: x=1.5%; MD=4.6%; σ=1.9%. Dose difference between EGS and kV-TPS was: x=0.8%; MD=1.9%; σ=0.8%. Using the heterogeneous phantom, dose difference between film and kV-TPS was: x=2.6%; MD=3%; σ=1.1%; and dose difference between TLD and kV-TPS was: x=2.9%; MD=6.4%; σ=2.5%. Conclusion: The inhouse, open-source kV-TPS dose calculation system was comparable within 5% of measurements and MC simulations in both homogeneous and heterogeneous phantoms. The dose calculation system of the kV-TPS is validated as a part of initial commissioning process for small animal radiotherapy

  8. Reactive power balance in a distribution network with wind farms and CHPS

    DEFF Research Database (Denmark)

    Lund, Torsten; Nielsen, John Eli; Hylle, Per

    2007-01-01

    In Denmark, a large part of the electricity is generated by wind turbines and combined heat and power plants. Most of them are connected to the distribution systems. In periods with high wind speeds, large flows of reactive power have been observed between the 150kV and the 60 kV systems. The tra......In Denmark, a large part of the electricity is generated by wind turbines and combined heat and power plants. Most of them are connected to the distribution systems. In periods with high wind speeds, large flows of reactive power have been observed between the 150kV and the 60 kV systems....... The transfer of reactive power reduces the capacity of the lines, causes thermal losses and can in some cases reduce the voltage stability margin of the system. To identify the origin of the problem, an actual distribution system with a high penetration of wind power and distributed generation has been...

  9. Nuclear power plant annunciator systems

    International Nuclear Information System (INIS)

    Rankin, W.L.

    1983-08-01

    Analyses of nuclear power plant annunciator systems have uncovered a variety of problems. Many of these problems stem from the fact that the underlying philosophy of annunciator systems have never been elucidated so as to impact the initial annunciator system design. This research determined that the basic philosophy of an annunciator system should be to minimize the potential for system and process deviations to develop into significant hazards. In order to do this the annunciator system should alert the operators to the fact that a system or process deviation exists, inform the operators as to the priority and nature of the deviation, guide the operators' initial responses to the deviation, and confirm whether operators responses corrected the deviation. Annunciator design features were analyzed to determine to what degree they helped the system meet the functional criteria, the priority for implementing specific design features, and the cost and ease of implementing specific design features

  10. The electric power engineering handbook power system stability and control

    CERN Document Server

    Grisby, Leonard L

    2012-01-01

    With contributions from worldwide leaders in the field, Power System Stability and Control, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) updates coverage of recent developments and rapid technological growth in essential aspects of power systems. Edited by L.L. Grigsby, a respected and accomplished authority in power engineering, and section editors Miroslav Begovic, Prabha Kundur, and Bruce Wollenberg, this reference presents substantially new and revised content. Topics covered include: * Power System Protection * Power System Dynamics and Stability *

  11. Major Refit for CERN's 400 kV Substation

    CERN Multimedia

    2001-01-01

    The 400 kV substation on the Prévessin site brings in the electricity that powers CERN's accelerators and the majority of the Laboratory's installations. It was originally built in the 1970s for the SPS, and is one of only five privately owned 400 kV sub-stations in France. Three of the others belong to the national railway company, SNCF, supplying the Paris-Marseilles TGV line, the other is at the Cadarache research centre near mouth of the Rhone. After nearly thirty years of service, CERN's substation has just undergone a complete overhaul. The new main 18 kV switchboard for the SPS pulsed network. The electricity supply for the original Prévessin substation was from the 400 kV EDF network, delivered through three 90 MW transformers at 18 kV to the SPS pulsed network, With the arrival of LEP, two 110 MW transformers were added to supply the new accelerator. Now, as CERN gears up for the LHC, additional pulsed power capacity is needed to supply the transfer lines carrying protons from...

  12. Faraday Rotator 5 kV Capacitor Bank

    International Nuclear Information System (INIS)

    Fetterman, C.C.

    1975-01-01

    A Faraday rotator 5 kV capacitor bank is a pulsed output power supply used to energize Faraday rotators for optical isolation in the ''LLL kJ Glass Laser System.'' Each supply contains either one, two or three parallel 240 μF storage capacitors depending on the size of the isolator used. Generally, the ''A*''(216 μH) isolator is energized with one capacitor, the ''A''(116 μH) isolator uses two capacitors and the ''B''(87 μH) isolator requires three capacitors. All models of isolators have been tested with four capacitors under maximum voltage and 25 feet of RG-217 cable with no hazardous effects. Except for the number of capacitors in each unit, the supplies are otherwise physically identical

  13. Composite type nuclear power system

    International Nuclear Information System (INIS)

    Nakamoto, Koichiro.

    1993-01-01

    The present invention realizes a high thermal efficiency by heating steams at the exit of a steam generator of a nuclear power plant to high temperature by a thermal super-heating boiler. That is, a thermal superheating boiler is disposed between the steam generator and a turbogenerator to heat steams from the steam generator and supply them to the turbogenerator. In this case, it may be possible that feedwater superheating boiler pipelines to the steam generator are caused to pass through the thermal superheating boiler so that they also have a performance of heating feedwater. If the system of the present invention is used, it is possible to conduct base load operation by nuclear power and a load following operation by controlling the thermal superheating boiler. Further, a hydrogen producing performance is applied to the thermal superheating boiler to produce hydrogen when electric power load is lowered. An internally sustaining type operation method can be conducted of burning hydrogen by the superheating boiler upon increased electric power load. As a result, a power generation system which has an excellent economical property and can easily cope with the load following operation can be attained. (I.S.)

  14. β-Secretase BACE1 Promotes Surface Expression and Function of Kv3.4 at Hippocampal Mossy Fiber Synapses.

    Science.gov (United States)

    Hartmann, Stephanie; Zheng, Fang; Kyncl, Michele C; Karch, Sandra; Voelkl, Kerstin; Zott, Benedikt; D'Avanzo, Carla; Lomoio, Selene; Tesco, Giuseppina; Kim, Doo Y; Alzheimer, Christian; Huth, Tobias

    2018-04-04

    The β-secretase β-site APP-cleaving enzyme 1 (BACE1) is deemed a major culprit in Alzheimer's disease, but accumulating evidence indicates that there is more to the enzyme than driving the amyloidogenic processing of the amyloid precursor protein. For example, BACE1 has emerged as an important regulator of neuronal activity through proteolytic and, most unexpectedly, also through nonproteolytic interactions with several ion channels. Here, we identify and characterize the voltage-gated K + channel 3.4 (Kv3.4) as a new and functionally relevant interaction partner of BACE1. Kv3.4 gives rise to A-type current with fast activating and inactivating kinetics and serves to repolarize the presynaptic action potential. We found that BACE1 and Kv3.4 are highly enriched and remarkably colocalized in hippocampal mossy fibers (MFs). In BACE1 -/- mice of either sex, Kv3.4 surface expression was significantly reduced in the hippocampus and, in synaptic fractions thereof, Kv3.4 was specifically diminished, whereas protein levels of other presynaptic K + channels such as K Ca 1.1 and K Ca 2.3 remained unchanged. The apparent loss of presynaptic Kv3.4 affected the strength of excitatory transmission at the MF-CA3 synapse in hippocampal slices of BACE1 -/- mice when probed with the Kv3 channel blocker BDS-I. The effect of BACE1 on Kv3.4 expression and function should be bidirectional, as predicted from a heterologous expression system, in which BACE1 cotransfection produced a concomitant upregulation of Kv3.4 surface level and current based on a physical interaction between the two proteins. Our data show that, by targeting Kv3.4 to presynaptic sites, BACE1 endows the terminal with a powerful means to regulate the strength of transmitter release. SIGNIFICANCE STATEMENT The β-secretase β-site APP-cleaving enzyme 1 (BACE1) is infamous for its crucial role in the pathogenesis of Alzheimer's disease, but its physiological functions in the intact nervous system are only gradually

  15. Power management for energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Gybel Hovgaard, T.

    2013-02-15

    In this thesis, we consider the control of two different industrial applications that belong at either end of the electricity grid; a power consumer in the form of a commercial refrigeration system, and wind turbines for power production. Our primary studies deal with economic model predictive control of a commercial multi-zone refrigeration system, consisting of several cooling units that share a common compressor, and is used to cool multiple areas or rooms, e.g., in supermarkets. For control of the commercial refrigeration application as well as the wind turbine application, we propose an economic optimizing model predictive controller, economic MPC. Our investigations are primarily concerned with: 1) modeling of the applications to suit the chosen control framework; 2) formulating the MPC controller laws to overcome challenges introduced by the industrial applications, and defining economic objectives that reect the real physics of the systems as well as our control objectives; 3) solving the involved, non-trivial optimization problems eciently in real-time; 4) demonstrating the feasibility and potential of the proposed methods by extensive simulation and comparison with existing control methods and evaluation of data from systems in actual operation. We demonstrate, i.a., substantial cost savings, on the order of 30 %, compared to a standard thermostat-based supermarket refrigeration system and show how our methods exhibit sophisticated demand response to real-time variations in electricity prices. Violations of the temperature ranges can be kept at a very low frequency of occurrence inspite of the presence of uncertainty. For the power output from wind turbines, ramp rates, as low a 3 % of the rated power per minute, can be effectively ensured with the use of energy storage and we show how the active use of rotor inertia as an additional energy storage can reduce the needed storage capacity by up to 30 % without reducing the power output. (Author)

  16. Dynamic influences of wind power on the power system

    Energy Technology Data Exchange (ETDEWEB)

    Rosas, Pedro

    2003-03-01

    The thesis first presents the basics influences of wind power on the power system stability and quality by pointing out the main power quality issues of wind power in a small-scale case and following, the expected large-scale problems are introduced. Secondly, a dynamic wind turbine model that supports power quality assessment of wind turbines is presented. Thirdly, an aggregate wind farm model that support power quality and stability analysis from large wind farms is presented. The aggregate wind farm model includes the smoothing of the relative power fluctuation from a wind farm compared to a single wind turbine. Finally, applications of the aggregate wind farm model to the power systems are presented. The power quality and stability characteristics influenced by large-scale wind power are illustrated with three cases. In this thesis, special emphasis has been given to appropriate models to represent the wind acting on wind farms. The wind speed model to a single wind turbine includes turbulence and tower shadow effects from the wind and the rotational sampling turbulence due to the rotation of the blades. In a park scale, the wind speed model to the wind farm includes the spatial coherence between different wind turbines. Here the wind speed model is applied to a constant rotational speed wind turbine/farm, but the model is suitable to variable speed wind turbine/farm as well. The cases presented here illustrate the influences of the wind power on the power system quality and stability. The flicker and frequency deviations are the main power quality parameters presented. The power system stability concentrates on the voltage stability and on the power system oscillations. From the cases studied, voltage and the frequency variations were smaller than expected from the large-scale wind power integration due to the low spatial correlation of the wind speed. The voltage quality analysed in a Brazilian power system and in the Nordel power system from connecting large

  17. 76 FR 48159 - Integrated System Power Rates

    Science.gov (United States)

    2011-08-08

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Integrated System Power Rates AGENCY... American Electric Reliability Corporation and to cover increased investments and replacements in..., prepared a Current Power Repayment Study using existing system rates. The Study indicates that Southwestern...

  18. Hydrogen fuel cell power system

    International Nuclear Information System (INIS)

    Lam, A.W.

    2004-01-01

    'Full text:' Batteries are typically a necessary and prime component of any DC power system, providing a source of on-demand stored energy with proven reliability. The integration of batteries and basic fuel cells for mobile and stationary utility applications poses a new challenge. For high value applications, the specification and operating requirements for this hybrid module differ from conventional requirements as the module must withstand extreme weather conditions and provide extreme reliability. As an electric utility company, BCHydro has embarked in the development and application of a Hydrogen Fuel Cell Power Supply (HFCPS) for field trial. A Proton Exchange Membrane (PEM)- type fuel cell including power electronic modules are mounted in a standard 19-inch rack that provides 48V, 24V, 12V DC and 120V AC outputs. The hydrogen supply consists of hydrogen bottles and regulating devices to provide a continuous fuel source to the power modules. Many tests and evaluations have been done to ensure the HFCPS package is robust and suitable for electric utility grade operation. A field trial demonstrating this standalone system addressed reliability, durability, and installation concerns as well as developed the overall system operating procedures. (author)

  19. Manned spacecraft electrical power systems

    Science.gov (United States)

    Simon, William E.; Nored, Donald L.

    1987-01-01

    A brief history of the development of electrical power systems from the earliest manned space flights illustrates a natural trend toward a growth of electrical power requirements and operational lifetimes with each succeeding space program. A review of the design philosophy and development experience associated with the Space Shuttle Orbiter electrical power system is presented, beginning with the state of technology at the conclusion of the Apollo Program. A discussion of prototype, verification, and qualification hardware is included, and several design improvements following the first Orbiter flight are described. The problems encountered, the scientific and engineering approaches used to meet the technological challenges, and the results obtained are stressed. Major technology barriers and their solutions are discussed, and a brief Orbiter flight experience summary of early Space Shuttle missions is included. A description of projected Space Station power requirements and candidate system concepts which could satisfy these anticipated needs is presented. Significant challenges different from Space Shuttle, innovative concepts and ideas, and station growth considerations are discussed. The Phase B Advanced Development hardware program is summarized and a status of Phase B preliminary tradeoff studies is presented.

  20. Power System Operation with Large Scale Wind Power Integration

    DEFF Research Database (Denmark)

    Suwannarat, A.; Bak-Jensen, B.; Chen, Z.

    2007-01-01

    to the uncertain nature of wind power. In this paper, proposed models of generations and control system are presented which analyze the deviation of power exchange at the western Danish-German border, taking into account the fluctuating nature of wind power. The performance of the secondary control of the thermal......The Danish power system starts to face problems of integrating thousands megawatts of wind power, which produce in a stochastic behavior due to natural wind fluctuations. With wind power capacities increasing, the Danish Transmission System Operator (TSO) is faced with new challenges related...... power plants and the spinning reserves control from the Combined Heat and Power (CHP) units to achieve active power balance with the increased wind power penetration is presented....

  1. Electrical system design status of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Song, In Taek; Mun, Kyeong Jun; Kim, Jun Yeon [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Proton Engineering Frontier Project (PEFP) has been developing a 100 MeV proton linear accelerator. Also, PEFP has been designing the Proton Accelerator Research Center in Gyeongju. In site, we installed GIS (Gas Insulated Switchgear) to receive 154kV electric power and 154kV/3.3kV transformer. For the energy saving scheme, we are now installing solar power system, automatic lighting control system and maximum control power system of PEFP. In this paper, we described electrical power system of PEFP.

  2. IOT based RF power systems as an alternative to klystron amplifier in Indus-2 at the rate 505.812 MHz

    International Nuclear Information System (INIS)

    Deo, R.K.; Jain, M.K.; Kumar, Gautam; Lad, Mahendra; Badapanda, M.K.; Bagre, Sunil; Upadhyay, Rinki; Tripathi, Akhilesh; Rao, J.N.; Pandiyar, Mohan; Hannurkar, P.R.

    2013-01-01

    Due to non-availability of replacement Klystron tube in Indus-2, an IOT based high power RF amplifier system is realized. It is based on E2V make 80 kW IOTD2130 tube with its circuit assembly IMD2000ST. This amplifier system is easily available commercially due to its application in DTV broadcast. It has inherent advantages over klystron amplifier viz. high efficiency (η), less phase and amplitude sensitivity to HV ripple, higher linearity, compactness and less cooling requirement. This high power IOT amplifier is tested with its required control system, cooling system, electron gun auxiliary supplies, beam supply and focusing supply. The nominal beam voltage for this IOT is -36 kV however amplifier was tested successfully with indigenously developed -32 kV, crowbar less power supply. The optimum load impedance for IOT beam was calculated for this bias voltage ( 32kV). For the required load impedance, coupling coefficient (β) of output coupler to the O/P cavity was estimated and accordingly loop angle was adjusted. The amplifier has been tested up to 50 kW with amplifier efficiency 60% and gain 23 dB at - 32 kV beam voltage. (author)

  3. Power system dynamics and control

    CERN Document Server

    Kwatny, Harry G

    2016-01-01

    This monograph explores a consistent modeling and analytic framework that provides the tools for an improved understanding of the behavior and the building of efficient models of power systems. It covers the essential concepts for the study of static and dynamic network stability, reviews the structure and design of basic voltage and load-frequency regulators, and offers an introduction to power system optimal control with reliability constraints. A set of Mathematica tutorial notebooks providing detailed solutions of the examples worked-out in the text, as well as a package that will enable readers to work out their own examples and problems, supplements the text. A key premise of the book is that the design of successful control systems requires a deep understanding of the processes to be controlled; as such, the technical discussion begins with a concise review of the physical foundations of electricity and magnetism. This is followed by an overview of nonlinear circuits that include resistors, inductors, ...

  4. Handbook of power systems engineering with power electronics applications

    CERN Document Server

    Hase, Yoshihide

    2012-01-01

    Formerly known as Handbook of Power System Engineering, this second edition provides rigorous revisions to the original treatment of systems analysis together with a substantial new four-chapter section on power electronics applications. Encompassing a whole range of equipment, phenomena, and analytical approaches, this handbook offers a complete overview of power systems and their power electronics applications, and presents a thorough examination of the fundamental principles, combining theories and technologies that are usually treated in separate specialised fields, in a single u

  5. Measurement ot the switching over-voltages at the disconnection of the high voltage shunt reactors in the Romanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Stroica, Paul Constantin; Merfu, Ion; Stroica, Mihail; Merfu, Marius; Cojocaru, Florian; Stefan, Dinu; Cojocaru, Mihai

    2010-09-15

    The paper presents the measurements of the switching over-voltages made in the Romanian Power System, at the 400/220/110 kV Urechesti substation at the disconnection of a 400 kV, 100 MVAr shunt reactor type DFAL, Siemens, Germany, in 3 consecutive versions. The first one is for shunt reactor controlled by live-tank oil circuit breaker, the second one is for shunt reactor controlled by SF6 circuit breaker, and the third one is for shunt reactor controlled by SF6 circuit breaker and synchronize device.

  6. Transients in reactors for power systems compensation

    Science.gov (United States)

    Abdul Hamid, Haziah

    This thesis describes new models and investigations into switching transient phenomena related to the shunt reactors and the Mechanically Switched Capacitor with Damping Network (MSCDN) operations used for reactive power control in the transmission system. Shunt reactors and MSCDN are similar in that they have reactors. A shunt reactor is connected parallel to the compensated lines to absorb the leading current, whereas the MSCDN is a version of a capacitor bank designed as a C-type filter for use in the harmonic-rich environment. In this work, models have been developed and transient overvoltages due to shunt reactor deenergisation were estimated analytically using MathCad, a mathematical program. Computer simulations used the ATP/EMTP program to reproduce both single-phase and three-phase shunt reactor switching at 275 kV operational substations. The effect of the reactor switching on the circuit breaker grading capacitor was also examined by considering various switching conditions.. The main original achievement of this thesis is the clarification of failure mechanisms occurring in the air-core filter reactor due to MSCDN switching operations. The simulation of the MSCDN energisation was conducted using the ATP/EMTP program in the presence of surge arresters. The outcome of this simulation shows that extremely fast transients were established across the air-core filter reactor. This identified transient event has led to the development of a detailed air-core reactor model, which accounts for the inter-turn RLC parameters as well as the stray capacitances-to-ground. These parameters are incorporated into the transient simulation circuit, from which the current and voltage distribution across the winding were derived using electric field and equivalent circuit modelling. Analysis of the results has revealed that there are substantial dielectric stresses imposed on the winding insulation that can be attributed to a combination of three factors. (i) First, the

  7. Development of a 300-kV Marx generator and its application to drive ...

    Indian Academy of Sciences (India)

    Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, ... anode gap of 7·5 mm, an REB having beam voltage 160 kV and duration 150 ns ... lowest stage has a triggered SG which is closed by a 6 kV pulse obtained with the ...

  8. Electric Vehicles in Power Systems with 50% Wind Power Penetration

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Foosnæs, Anders; Xu, Zhao

    2009-01-01

    will be an important balancing measure to enable the Danish government’s energy strategy, which implies 50% wind power penetration in the electric power system. An EV will be a storage device for smoothing power fluctuations from renewable resources especially wind power and provide valuable system services...... for a reliable power system operation. Cost-benefit analysis shows that intelligent bidirectional charging – vehicle to grid (V2G) – provides a socio-economic profit of 150 million Euro/year in the Danish electric power system in 2025 assuming that 15% of the Danish road transport need is supplied by electricity....... This paper analyse the potential for using EVs in Denmark and identify the benefits of the electric power system with high wind power generation by intelligent charging of the EVs. Based on the analysis important technology gabs are identified, and the corresponding research and development initiatives...

  9. Analysis of three-phase power-supply systems using computer-aided design programs

    International Nuclear Information System (INIS)

    Oberst, E.F.

    1977-01-01

    A major concern of every designer of large, three-phase power-supply systems is the protection of system components from overvoltage transients. At present, three computer-aided circuit design programs are available in the Magnetic Fusion Energy (MFE) National Computer Center that can be used to analyze three-phase power systems: MINI SCEPTRE, SPICE I, and SPICE II. These programs have been used at Lawrence Livermore Laboratory (LLL) to analyze the operation of a 200-kV dc, 20-A acceleration power supply for the High Voltage Test Stand. Various overvoltage conditions are simulated and the effectiveness of system protective devices is observed. The simulated overvoltage conditions include such things as circuit breaker openings, pulsed loading, and commutation voltage surges in the rectifiers. These examples are used to illustrate the use of the computer-aided, circuit-design programs discussed in this paper

  10. PIC simulation of the vacuum power flow for a 5 terawatt, 5 MV, 1 MA pulsed power system

    Science.gov (United States)

    Liu, Laqun; Zou, Wenkang; Liu, Dagang; Guo, Fan; Wang, Huihui; Chen, Lin

    2018-03-01

    In this paper, a 5 Terawatt, 5 MV, 1 MA pulsed power system based on vacuum magnetic insulation is simulated by the particle-in-cell (PIC) simulation method. The system consists of 50 100-kV linear transformer drive (LTD) cavities in series, using magnetically insulated induction voltage adder (MIVA) technology for pulsed power addition and transmission. The pulsed power formation and the vacuum power flow are simulated when the system works in self-limited flow and load-limited flow. When the pulsed power system isn't connected to the load, the downstream magnetically insulated transmission line (MITL) works in the self-limited flow, the maximum of output current is 1.14 MA and the amplitude of voltage is 4.63 MV. The ratio of the electron current to the total current is 67.5%, when the output current reached the peak value. When the impedance of the load is 3.0 Ω, the downstream MITL works in the self-limited flow, the maximums of output current and the amplitude of voltage are 1.28 MA and 3.96 MV, and the ratio of the electron current to the total current is 11.7% when the output current reached the peak value. In addition, when the switches are triggered in synchronism with the passage of the pulse power flow, it effectively reduces the rise time of the pulse current.

  11. A method and system for power management

    NARCIS (Netherlands)

    Burchard, Arthur Tadeusz; Goossens, Koos Gerard Willen; Milutinovic, A.; Molnos, Anca Mariana; Steffens, Elisabeth Francisca Maria

    2009-01-01

    A method and system for power management is provided. To control power supplied to a second electronic device (106), an electronic system (100) comprises a power management subsystem (110), a first electronic device (102); The power management subsystem (110) monitors the power consumed by the first

  12. SP-100/Brayton power system concepts

    International Nuclear Information System (INIS)

    Owen, D.F.

    1989-01-01

    Use of closed Brayton cycle (CBC) power conversion technology has been investigated for use with SP-100 reactors for space power systems. The CBC power conversion technology is being developed by Rockwell International under the Dynamic Isotype Power System (DIPS) and Space Station Freedom solar dynamic power system programs to provide highly efficient power conversion with radioisotype and solar collector heat sources. Characteristics including mass, radiator area, thermal power, and operating temperatures for systems utilizing SP-100 reactor and CBC power conversion technology were determined for systems in the 10-to 100-kWe power range. Possible SP-100 reactor/CBC power system configurations are presented. Advantages of CBC power conversion technology with regard to reactor thermal power, operating temperature, and development status are discussed

  13. Deletion of the Kv2.1 delayed rectifier potassium channel leads to neuronal and behavioral hyperexcitability

    Science.gov (United States)

    Speca, David J.; Ogata, Genki; Mandikian, Danielle; Bishop, Hannah I.; Wiler, Steve W.; Eum, Kenneth; Wenzel, H. Jürgen; Doisy, Emily T.; Matt, Lucas; Campi, Katharine L.; Golub, Mari S.; Nerbonne, Jeanne M.; Hell, Johannes W.; Trainor, Brian C.; Sack, Jon T.; Schwartzkroin, Philip A.; Trimmer, James S.

    2014-01-01

    The Kv2.1 delayed rectifier potassium channel exhibits high-level expression in both principal and inhibitory neurons throughout the central nervous system, including prominent expression in hippocampal neurons. Studies of in vitro preparations suggest that Kv2.1 is a key yet conditional regulator of intrinsic neuronal excitability, mediated by changes in Kv2.1 expression, localization and function via activity-dependent regulation of Kv2.1 phosphorylation. Here we identify neurological and behavioral deficits in mutant (Kv2.1−/−) mice lacking this channel. Kv2.1−/− mice have grossly normal characteristics. No impairment in vision or motor coordination was apparent, although Kv2.1−/− mice exhibit reduced body weight. The anatomic structure and expression of related Kv channels in the brains of Kv2.1−/− mice appears unchanged. Delayed rectifier potassium current is diminished in hippocampal neurons cultured from Kv2.1−/− animals. Field recordings from hippocampal slices of Kv2.1−/− mice reveal hyperexcitability in response to the convulsant bicuculline, and epileptiform activity in response to stimulation. In Kv2.1−/− mice, long-term potentiation at the Schaffer collateral – CA1 synapse is decreased. Kv2.1−/− mice are strikingly hyperactive, and exhibit defects in spatial learning, failing to improve performance in a Morris Water Maze task. Kv2.1−/− mice are hypersensitive to the effects of the convulsants flurothyl and pilocarpine, consistent with a role for Kv2.1 as a conditional suppressor of neuronal activity. Although not prone to spontaneous seizures, Kv2.1−/− mice exhibit accelerated seizure progression. Together, these findings suggest homeostatic suppression of elevated neuronal activity by Kv2.1 plays a central role in regulating neuronal network function. PMID:24494598

  14. Robust power system frequency control

    CERN Document Server

    Bevrani, Hassan

    2014-01-01

    This updated edition of the industry standard reference on power system frequency control provides practical, systematic and flexible algorithms for regulating load frequency, offering new solutions to the technical challenges introduced by the escalating role of distributed generation and renewable energy sources in smart electric grids. The author emphasizes the physical constraints and practical engineering issues related to frequency in a deregulated environment, while fostering a conceptual understanding of frequency regulation and robust control techniques. The resulting control strategi

  15. NUCLEAR THERMIONIC SPACE POWER SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Howard, R. C.; Rasor, N. S.

    1963-03-15

    The various concepts for utilizing thermionic conversion in space reactor power plants are described and evaluated. The problems (and progress toward their solution) of the in-core concept, particularly, are considered. Progress in thermionic conversion technology is then reviewed from both the hardware and research points of view. Anticipated progress in thermionic conversion and the possible consequences for the performance of electrical propulsion systems are summarized. 46 references. (D.C.W.)

  16. Selectivity of power system protections at power swings in power system

    Directory of Open Access Journals (Sweden)

    Jan Machowski

    2012-12-01

    Full Text Available The paper discusses out-of-step protection systems such as: generator pole slip protections, out of step tripping protections, distance protections of step-up transformer, distance protections of transmission lines and transformers, power swing blocking, and special out-of-step protection. It is shown that all these protections make up a protection system, to which a setting concept uniform for the entire power system has to be applied. If a power system is inappropriately equipped with these protections, or their settings are inappropriate, they may operate unselectively, thus contributing to the development of power system blackouts. In the paper the concepts for a real power system are given for the two stages: target stage fully compliant with selectivity criteria, and transitional stage between the current and target stages.

  17. Advanced Radioisotope Power Systems Segmented Thermoelectric Research

    Science.gov (United States)

    Caillat, Thierry

    2004-01-01

    Flight times are long; - Need power systems with >15 years life. Mass is at an absolute premium; - Need power systems with high specific power and scalability. 3 orders of magnitude reduction in solar irradiance from Earth to Pluto. Nuclear power sources preferable. The Overall objective is to develop low mass, high efficiency, low-cost Advanced Radioisotope Power System with double the Specific Power and Efficiency over state-of-the-art Radioisotope Thermoelectric Generators (RTGs).

  18. Electrical power systems for Space Station

    Science.gov (United States)

    Simon, W. E.

    1984-01-01

    Major challenges in power system development are described. Evolutionary growth, operational lifetime, and other design requirements are discussed. A pictorial view of weight-optimized power system applications shows which systems are best for missions of various lengths and required power level. Following definition of the major elements of the electrical power system, an overview of element options and a brief technology assessment are presented. Selected trade-study results show end-to-end system efficiencies, required photovoltaic power capability as a function of energy storage system efficiency, and comparisons with other systems such as a solar dynamic power system.

  19. Optimization of 200 kV electrostatic accelerator

    Directory of Open Access Journals (Sweden)

    M Nazmabadi

    2015-09-01

    Full Text Available Optimizations on 200 kV electrostatic accelerator have been done in order to increasing ion current on target, improving vacuum condition and reduction in x-rays emission, increasing stability of high voltage power supply and reaching much greater achievable voltage value. The accelerator tube has most important effect on beam tracing in the electrostatic accelerators. So precautions most be considered in designing and constructing of this part. In order to finding permissible tolerances in construction and assembling of 200 kV electrostatic accelerator column, first the effects of angle deviation of a part from accelerator axis on beam track in the accelerator tube was simulated with Simion 7.0 computer program. We found that in order to prevent beam lost, the tolerances of balancing and co-centering of each part should be smaller than 0.1 mm. Each part of accelerator tube constructed by tolerances lower than 0.05 mm. Ultrasonic cleaning method used in pre-assembling process of parts. Because of its excellences, in the new tube we used borosilicate glass instead of high density alumina as insulators between the metallic electrodes. After three days of working vacuum pumps the system reached to 8.0×10-7 and after months to 5.0×10-7 ultimate pressure values. Measurements showed that by these considerations the maximum of reachable ion current on target was 1.1 mA which increased 50% compared to old machine, while x-ray emission intensity was increased by 25%. Optimizations of high voltage power supply are now under studies and tests

  20. Instrumentation for Power System Disturbance Monitoring, Data ...

    African Journals Online (AJOL)

    In this paper, the level of instrumentation for power system disturbance monitoring, data acquisition and control in Nigerian Electric Power System; National Electric Power Authority (NEPA) is presented. The need for accurate power system disturbance monitoring is highlighted. A feature of an adequate monitoring, data ...

  1. Lunar power systems. Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The findings of a study on the feasibility of several methods of providing electrical power for a permanently manned lunar base are provided. Two fundamentally different methods for lunar electrical power generation are considered. One is the use of a small nuclear reactor and the other is the conversion of solar energy to electricity. The baseline goal was to initially provide 300 kW of power with growth capability to one megawatt and eventually to 10 megawatts. A detailed, day by day scenario for the establishment, build-up, and operational activity of the lunar base is presented. Also presented is a conceptual approach to a supporting transportation system which identifies the number, type, and deployment of transportation vehicles required to support the base. An approach to the use of solar cells in the lunar environment was developed. There are a number of heat engines which are applicable to solar/electric conversions, and these are examined. Several approaches to energy storage which were used by the electric power utilities were examined and those which could be used at a lunar base were identified

  2. MEMS Rotary Engine Power System

    Science.gov (United States)

    Fernandez-Pello, A. Carlos; Pisano, Albert P.; Fu, Kelvin; Walther, David C.; Knobloch, Aaron; Martinez, Fabian; Senesky, Matt; Stoldt, Conrad; Maboudian, Roya; Sanders, Seth; Liepmann, Dorian

    This work presents a project overview and recent research results for the MEMS Rotary Engine Power System project at the Berkeley Sensor & Actuator Center of the University of California at Berkeley. The research motivation for the project is the high specific energy density of hydrocarbon fuels. When compared with the energy density of batteries, hydrocarbon fuels may have as much as 20x more energy. However, the technical challenge is the conversion of hydrocarbon fuel to electricity in an efficient and clean micro engine. A 12.9 mm diameter Wankel engine will be shown that has already generated 4 Watts of power at 9300rpm. In addition, the 1mm and 2.4 mm Wankel engines that BSAC is developing for power generation at the microscale will be discussed. The project goal is to develop electrical power output of 90milliwatts from the 2.4 mm engine. Prototype engine components have already been fabricated and these will be described. The integrated generator design concept utilizes a nickel-iron alloy electroplated in the engine rotor poles, so that the engine rotor also serves as the generator rotor.

  3. Modeling Power Systems as Complex Adaptive Systems

    Energy Technology Data Exchange (ETDEWEB)

    Chassin, David P.; Malard, Joel M.; Posse, Christian; Gangopadhyaya, Asim; Lu, Ning; Katipamula, Srinivas; Mallow, J V.

    2004-12-30

    Physical analogs have shown considerable promise for understanding the behavior of complex adaptive systems, including macroeconomics, biological systems, social networks, and electric power markets. Many of today's most challenging technical and policy questions can be reduced to a distributed economic control problem. Indeed, economically based control of large-scale systems is founded on the conjecture that the price-based regulation (e.g., auctions, markets) results in an optimal allocation of resources and emergent optimal system control. This report explores the state-of-the-art physical analogs for understanding the behavior of some econophysical systems and deriving stable and robust control strategies for using them. We review and discuss applications of some analytic methods based on a thermodynamic metaphor, according to which the interplay between system entropy and conservation laws gives rise to intuitive and governing global properties of complex systems that cannot be otherwise understood. We apply these methods to the question of how power markets can be expected to behave under a variety of conditions.

  4. Review of Power System Stability with High Wind Power Penetration

    DEFF Research Database (Denmark)

    Hu, Rui; Hu, Weihao; Chen, Zhe

    2015-01-01

    analyzing methods and stability improvement approaches. With increasing wind power penetration, system balancing and the reduced inertia may cause a big threaten for stable operation of power systems. To mitigate or eliminate the wind impacts for high wind penetration systems, although the practical......This paper presents an overview of researches on power system stability with high wind power penetration including analyzing methods and improvement approaches. Power system stability issues can be classified diversely according to different considerations. Each classified issue has special...... and reliable choices currently are the strong outside connections or sufficient reserve capacity constructions, many novel theories and approaches are invented to investigate the stability issues, looking forward to an extra-high penetration or totally renewable resource based power systems. These analyzing...

  5. System and method for advanced power management

    Science.gov (United States)

    Atcitty, Stanley [Albuquerque, NM; Symons, Philip C [Surprise, AZ; Butler, Paul C [Albuquerque, NM; Corey, Garth P [Albuquerque, NM

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  6. Prototype tests on the ion source power supplies of the TEXTOR NI-system

    International Nuclear Information System (INIS)

    Goll, O.; Braunsberger, U.; Schwarz, U.

    1987-01-01

    The PINI ion source for the TEXTOR neutral injector is fed by a new modular transistorized power supply. All modules are located in a high voltage cage on 55 kV dc against ground. The normal operation of the injectors includes frequent grid breakdowns causing transient high voltage stresses on the ion source power supplies. These stresses must not disturb the safe operation of the power supplies. The paper describes the set up for extensive testing of a supply prototype module under the expected operating conditions. The main features of this test program are reviewed and the measures taken for a safe operation are discussed. As a result of the investigations, recommendations for the installation of the power supplies at the TEXTOR NI system are given

  7. Wind power variability and power system reserves in South Africa

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Litong-Palima, Marisciel; Hahmann, Andrea N.

    2017-01-01

    Variable renewable generation, primarily from wind and solar, introduces new uncertainties in the operation of power systems. This paper describes and applies a method to quantify how wind power development will affect the use of short-term automatic reserves in the future South African power sys...

  8. Design for Reliability of Power Electronic Systems

    DEFF Research Database (Denmark)

    Yang, Yongheng; Wang, Huai; Sangwongwanich, Ariya

    2018-01-01

    Power density, efficiency, cost, and reliability are the major challenges when designing a power electronic system. Latest advancements in power semiconductor devices (e.g., silicon carbide devices) and topological innovations have vital contributions to power density and efficiency. Nevertheless......, dedicated heat sink systems for thermal management are required to dissipate the power losses in power electronic systems; otherwise, the power devices will be heated up and eventually fail to operate. In addition, in many mission critical applications (e.g., marine systems), the operating condition (i...

  9. Artificial Intelligence and Spacecraft Power Systems

    Science.gov (United States)

    Dugel-Whitehead, Norma R.

    1997-01-01

    This talk will present the work which has been done at NASA Marshall Space Flight Center involving the use of Artificial Intelligence to control the power system in a spacecraft. The presentation will include a brief history of power system automation, and some basic definitions of the types of artificial intelligence which have been investigated at MSFC for power system automation. A video tape of one of our autonomous power systems using co-operating expert systems, and advanced hardware will be presented.

  10. Dynamic Influences of Wind Power on The Power System

    DEFF Research Database (Denmark)

    Rosas, Pedro Andrè Carvalho

    2004-01-01

    between different wind turbines.Here the wind speed model is applied to a constant rotational speed wind turbine/farm, but the model is suit-able to variable speed wind turbine/farm as well. The cases presented here illustrate the influences of the wind power on the power systemquality and stability...... integration due to the low spatial correlation of the wind speed. The voltage quality analysed in a Brazilian power system and in the Nordel power system from connecting largeamount of wind power showed very small voltage variations. The frequency variations analysed from the Nordel showed also small varia...

  11. Power quality in power systems and electrical machines

    CERN Document Server

    Fuchs, Ewald

    2015-01-01

    The second edition of this must-have reference covers power quality issues in four parts, including new discussions related to renewable energy systems. The first part of the book provides background on causes, effects, standards, and measurements of power quality and harmonics. Once the basics are established the authors move on to harmonic modeling of power systems, including components and apparatus (electric machines). The final part of the book is devoted to power quality mitigation approaches and devices, and the fourth part extends the analysis to power quality solutions for renewable

  12. Design development and testing of high voltage power supply with crowbar protection for IOT based RF amplifier system in VECC

    Science.gov (United States)

    Thakur, S. K.; Kumar, Y.

    2018-05-01

    This paper described the detailed design, development and testing of high voltage power supply (‑30 kV, 3.2 A) and different power supplies for biasing electrodes of Inductive Output Tube (IOT) based high power Radio Frequency (RF) amplifier. This IOT based RF amplifier is further used for pursuing research and development activity in superconducting RF cavity project at Variable Energy Cyclotron Centre (VECC) Kolkata. The state-of-the-art technology of IOT-based high power RF amplifier is designed, developed, and tested at VECC which is the first of its kind in India. A high voltage power supply rated at negative polarity of 30 kV dc/3.2 A is required for biasing cathode of IOT with crowbar protection circuit. This power supply along with crowbar protection system is designed, developed and tested at VECC for testing the complete setup. The technical difficulties and challenges occured during the design of cathode power supply, its crowbar protection techniques along with other supported power supplies i.e. grid and ion pump power supplies are discussed in this paper.

  13. Aircraft Fuel Cell Power Systems

    Science.gov (United States)

    Needham, Robert

    2004-01-01

    In recent years, fuel cells have been explored for use in aircraft. While the weight and size of fuel cells allows only the smallest of aircraft to use fuel cells for their primary engines, fuel cells have showed promise for use as auxiliary power units (APUs), which power aircraft accessories and serve as an electrical backup in case of an engine failure. Fuel cell MUS are both more efficient and emit fewer pollutants. However, sea-level fuel cells need modifications to be properly used in aircraft applications. At high altitudes, the ambient air has a much lower pressure than at sea level, which makes it much more difficult to get air into the fuel cell to react and produce electricity. Compressors can be used to pressurize the air, but this leads to added weight, volume, and power usage, all of which are undesirable things. Another problem is that fuel cells require hydrogen to create electricity, and ever since the Hindenburg burst into flames, aircraft carrying large quantities of hydrogen have not been in high demand. However, jet fuel is a hydrocarbon, so it is possible to reform it into hydrogen. Since jet fuel is already used to power conventional APUs, it is very convenient to use this to generate the hydrogen for fuel-cell-based APUs. Fuel cells also tend to get large and heavy when used for applications that require a large amount of power. Reducing the size and weight becomes especially beneficial when it comes to fuel cells for aircraft. My goal this summer is to work on several aspects of Aircraft Fuel Cell Power System project. My first goal is to perform checks on a newly built injector rig designed to test different catalysts to determine the best setup for reforming Jet-A fuel into hydrogen. These checks include testing various thermocouples, transmitters, and transducers, as well making sure that the rig was actually built to the design specifications. These checks will help to ensure that the rig will operate properly and give correct results

  14. Development of anode high voltage power supply system for ECRH of HL-2A tokamak

    International Nuclear Information System (INIS)

    Chen Wenguang

    2009-01-01

    The anode high voltage power supply system consist of DC high-voltage power supply (HVPS) and pulse modulator. SCR is used to vary AC input voltage of the step-up transformer by controlling the trigger phase in the HVPS, and regulate the DC output voltage linearly at the potential of low-end via BJT, Dual closed-loop control technology is applied in the controller, and its maximum output is at 30kV and 130mA. Tetrode is the core component of the modulator. The circuit design is optimized by using the simulation software. Test and HL-2A discharge experimental results show that the power supply system is designed with some characteristics of output scale widely, low ripple and modulate quickly. (authors)

  15. Large autonomous spacecraft electrical power system (LASEPS)

    Science.gov (United States)

    Dugal-Whitehead, Norma R.; Johnson, Yvette B.

    1992-01-01

    NASA - Marshall Space Flight Center is creating a large high voltage electrical power system testbed called LASEPS. This testbed is being developed to simulate an end-to-end power system from power generation and source to loads. When the system is completed it will have several power configurations, which will include several battery configurations. These configurations are: two 120 V batteries, one or two 150 V batteries, and one 250 to 270 V battery. This breadboard encompasses varying levels of autonomy from remote power converters to conventional software control to expert system control of the power system elements. In this paper, the construction and provisions of this breadboard are discussed.

  16. Modelling of electrical power systems for power flow analysis

    Energy Technology Data Exchange (ETDEWEB)

    Cogo, Joao Roberto [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    The industry systems in Brazil are responsible for a consumption of over 50% (fifty per cent) of the total electrical power generated: therefore, they are import loads in power flow studies, and their modeling should be as much the best. Usually, in power flow studies, the industry systems are modeled by taking the influence of the power (active and reactive) and of the current on the voltage into account. Since the inducting motors, within the industry systems, represent at least 50% (fifty per cent) of the power consumption, and a large part of them is oversize, it is proposed to represent the industry systems as a function of the characteristic of power on shaft versus voltage into account. Since the induction motors, within the industry systems, represent at least 50% (fifty per cent) of the power consumption, and a large part of them is oversized, it is proposed to represent the industry systems as a function of the characteristics of power on shaft versus voltage for the analysis of power systems, aiming a load flow study. Thereafter, a model of an equivalent motor which has a basis the typical performance curve of an induction motor is present. This model is obtained from empirical parameters, surveyed from a population of over 1000 motors. (author) 3 refs., 1 fig., 4 tabs.

  17. Developments of compact pulsed-power system toward X-ray sources

    Directory of Open Access Journals (Sweden)

    Miyamoto Takuya

    2013-11-01

    Full Text Available In order to generate X-rays from X-pinch, the peak current and current-rising time required are estimated to be 100 kA and 100 ns, respectively. To obtain these parameters, we developed a pulsed-power system, which consists of a parallelized pulse-forming network (PFN. The 20 PFN modules of the system were driven at a charging voltage of 20 kV by a thin copper wire of load resistance. The results showed that the current and current-rising time are 18 kA and 107 ns, respectively. The wire/plasma temperature is 6.9 eV. The pulsed-power system is expected to generate X-rays from X-pinch by the proposed system. This can be achieved by raising the voltage and increasing the number of PFN modules.

  18. Mitigation of Power System Oscillation Caused by Wind Power Fluctuation

    DEFF Research Database (Denmark)

    Su, Chi; Hu, Weihao; Chen, Zhe

    2013-01-01

    oscillation mitigation controllers are proposed and compared. A model of direct-drive-full-convertor-based wind farm connected to the IEEE 10-machine 39-bus system is adopted as the test system. The calculations and simulations are conducted in DIgSILENT PowerFactory 14.0. Results are presented to show......Wind power is increasingly integrated in modern power grids, which brings new challenges to the power system operation. Wind power is fluctuating because of the uncertain nature of wind, whereas wind shear and tower shadow effects also cause periodic fluctuations. These may lead to serious forced...... oscillation when the frequencies of the periodic fluctuations are close to the natural oscillation frequencies of the connected power system. By using modal analysis and time-domain simulations, this study studies the forced oscillation caused by the wind shear and tower shadow effects. Three forced...

  19. Solar-powered cooling system

    Science.gov (United States)

    Farmer, Joseph C.

    2015-07-28

    A solar-powered adsorption-desorption refrigeration and air conditioning system that uses nanostructural materials such as aerogels, zeolites, and sol gels as the adsorptive media. Refrigerant molecules are adsorbed on the high surface area of the nanostructural material while the material is at a relatively low temperature, perhaps at night. During daylight hours, when the nanostructural materials is heated by the sun, the refrigerant are thermally desorbed from the surface of the aerogel, thereby creating a pressurized gas phase in the vessel that contains the aerogel. This solar-driven pressurization forces the heated gaseous refrigerant through a condenser, followed by an expansion valve. In the condenser, heat is removed from the refrigerant, first by circulating air or water. Eventually, the cooled gaseous refrigerant expands isenthalpically through a throttle valve into an evaporator, in a fashion similar to that in more conventional vapor recompression systems.

  20. Photovoltaic power systems energy storage

    International Nuclear Information System (INIS)

    Buldini, P.L.

    1991-01-01

    Basically, the solar photovoltaic power system consists of: Array of solar panels; Charge/voltage stabilizer; Blocking diode and Storage device. The storage device is a very important part of the system due to the necessity to harmonize the inevitable time shift between energy supply and demand. As energy storage, different devices can be utilized, such as hydropumping, air or other gas compression, flywheel, superconducting magnet, hydrogen generation and so on, but actually secondary (rechargeable) electrochemical cells appear to be the best storage device, due to the direct use for recharge of the d.c. current provided by the solar panels, without any intermediate step of energy transformation and its consequent loss of efficiency

  1. Nuclear power systems: Their safety

    International Nuclear Information System (INIS)

    Myers, L.C.

    1993-01-01

    Mankind utilizes energy in many forms and from a variety of sources. Canada is one of a growing number of countries which have chosen to embrace nuclear-electric generation as a component of their energy systems. As of August 1992 there were 433 power reactors operating in 35 countries and accounting for more than 15% of the world's production of electricity. In 1992, thirteen countries derived at least 25% of their electricity from nuclear units, with France leading at nearly 70%. In the same year, Canada produced about 16% of its electricity from nuclear units. Some 68 power reactors are under construction in 16 countries, enough to expand present generating capacity by close to 20%. No human endeavour carries the guarantee of perfect safety and the question of whether or not nuclear-electric generation represents an 'acceptable' risk to society has long been vigorously debated. Until the events of late April 1986, nuclear safety had indeed been an issue for discussion, for some concern, but not for alarm. The accident at the Chernobyl reactor in the USSR has irrevocably changed all that. This disaster brought the matter of nuclear safety back into the public mind in a dramatic fashion. This paper discusses the issue of safety in complex energy systems and provides brief accounts of some of the most serious reactor accidents which have occurred to date. (author). 7 refs

  2. Nuclear excited power generation system

    International Nuclear Information System (INIS)

    Parker, R.Z.; Cox, J.D.

    1989-01-01

    A power generation system is described, comprising: a gaseous core nuclear reactor; means for passing helium through the reactor, the helium being excited and forming alpha particles by high frequency radiation from the core of the gaseous core nuclear reactor; a reaction chamber; means for coupling chlorine and hydrogen to the reaction chamber, the helium and alpha particles energizing the chlorine and hydrogen to form a high temperature, high pressure hydrogen chloride plasma; means for converting the plasma to electromechanical energy; means for coupling the helium back to the gaseous core nuclear reactor; and means for disassociating the hydrogen chloride to form molecular hydrogen and chlorine, to be coupled back to the reaction chamber in a closed loop. The patent also describes a power generation system comprising: a gaseous core nuclear reactor; means for passing hydrogen through the reactor, the hydrogen being excited by high frequency radiation from the core; means for coupling chlorine to a reaction chamber, the hydrogen energizing the chlorine in the chamber to form a high temperature, high pressure hydrogen chloride plasma; means for converting the plasma to electromechanical energy; means for disassociating the hydrogen chloride to form molecular hydrogen and chlorine, and means for coupling the hydrogen back to the gaseous core nuclear reactor in a closed loop

  3. Protection of control and monitoring equipment from electromagnetic noise in the 67 MJ, 50 kV capacitor bank

    Energy Technology Data Exchange (ETDEWEB)

    Galakhov, I V; Gasheev, A S; Grusin, I A; Gudov, S N; Kuz` michev, Yu P; Murugov, V M; Osin, V A; Pankratov, V I; Pegoev, I N [All-Russian Scientific Research Inst. of Experimental Physics, Sarov (Russian Federation)

    1997-12-31

    A discharge of the 67 MJ and 50 kV capacitor bank used as a pulsed power system for flashlamp pumping of ISKRA-5`s high-power iodine laser, involves control and diagnostic equipment being subjected to significant electromagnetic fields and electrical interference that will further develop through conductive circuits. The paper describes and validates design approaches to the grounding system, signal carriage and decoupling circuits that would result in lower interference both for the capacitor bank`s control and diagnostics systems. A summary is also given of the ten-years` practice in operating the control and diagnostics equipment during the facility experiments. (author). 1 tab., 3 refs.

  4. Nuclear reactor power supply system

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    The redundant signals from the sensor assemblies measuring the process parameters of a nuclear reactor power supply are transmitted each in its turn to a protection system which operates to actuate the protection apparatus for signals indicating off-process conditions. Each sensor assembly includes a number of like sensors measuring the same parameters. The sets of process signals derived from the sensor assemblies are each in its turn transmitted from the protection system to the control system which impresses control signals on the reactor or its components to counteract the tendency for conditions to drift off-normal status requiring operation of the protection system. A parameter signal selector prevents a parameter signal which differs from the other parameter signals of the set by more than twice the allowable variation from passing to the control system. Test signals are periodically impressed by a test unit on a selected pair of a selection unit and control channels. This arrangement eliminates the possibility that a single component failure which may be spurious will cause an inadvertent trip of the reactor during test. (author)

  5. Design characteristics of EU-APR1400 on-site power system

    International Nuclear Information System (INIS)

    Kim, D.H.; Kim, Y.S.; Kim, Y.S.

    2014-01-01

    In the global nuclear market, US and European design requirements have been largely used to develop the design of nuclear power plants(NPPs). The APR1400 design was developed on the basis of US regulatory guide and EPRI utility requirements document(URD). In order to enlarge the export market of APR1400, KHNP (Korea Hydro & Nuclear Power Co., Ltd) has developed the EU-APR1400 design which complies with the European nuclear design requirements. In this paper, the design characteristics of EU-APR1400 on-site power system developed according to the European design requirements of electrical power system are described. The European main design requirements of electrical power system involve 50 Hz rated frequency, 400/110 kV grid voltage, the application of the diversity and the redundancy, and so on. The EU-APR1400 on-site power system has been developed on the basis of these requirements. The representative designs include the redundancy, diversity, independence design, the emergency power supply design, the design for providing electrical power to the dedicated severe accident systems, and the design for European grid requirements. (author)

  6. ELECTRICAL POWER SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    M. Maniyar

    2004-06-22

    The purpose of this revision of the System Description Document (SDD) is to establish requirements that drive the design of the electrical power system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience are design engineers. This type of SDD leads and follows the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential to performing the design process. This SDD follows the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to this system are obtained from ''Project Functional and Operational Requirements'' (F&OR) (Siddoway, 2003). Other requirements to support the design process have been taken from higher level requirements documents such as ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), the fire hazards analyses, and the preclosure safety analysis. The above mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canori and Leitner 2003) requirements. This SDD includes several appendices with supporting information. Appendix B lists key system charts, diagrams, drawings, and lists; and Appendix C is a list of system procedures.

  7. Reliability of Power Electronic Converter Systems

    DEFF Research Database (Denmark)

    -link capacitance in power electronic converter systems; wind turbine systems; smart control strategies for improved reliability of power electronics system; lifetime modelling; power module lifetime test and state monitoring; tools for performance and reliability analysis of power electronics systems; fault...... for advancing the reliability, availability, system robustness, and maintainability of PECS at different levels of complexity. Drawing on the experience of an international team of experts, this book explores the reliability of PECS covering topics including an introduction to reliability engineering in power...... electronic converter systems; anomaly detection and remaining-life prediction for power electronics; reliability of DC-link capacitors in power electronic converters; reliability of power electronics packaging; modeling for life-time prediction of power semiconductor modules; minimization of DC...

  8. Power Electronics in Wind Turbine Systems

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Chen, Zhe; Teodorescu, Remus

    2006-01-01

    the conventional, fossil (and short term) based energy sources to renewable energy resources. The other is to use high efficient power electronics in power systems, power production and end-user application. This paper discuss the most emerging renewable energy source, wind energy, which by means of power...... electronics is changing from being a minor energy source to be acting as an important power source in the energy system. By that wind power is also getting an added value in the power system operation....

  9. High Power laser power conditioning system new discharge circuit research

    CERN Document Server

    Li Yi; Peng Han Sheng; Zhou Pei Zhang; Zheng Wan Guo; Guo Lang Fu; Chen Li Hua; Chen De Hui; Lai Gui You; Luan Yong Ping

    2002-01-01

    The new discharge circuit of power conditioning system for high power laser is studied. The theoretical model of the main discharge circuit is established. The pre-ionization circuit is studied in experiment. In addition, the explosion energy of the new large xenon lamp is successfully measured. The conclusion has been applied to 4 x 2 amplifier system

  10. Economic and Power System Modeling and Analysis | Water Power | NREL

    Science.gov (United States)

    Economic and Power System Modeling and Analysis Economic and Power System Modeling and Analysis technologies, their possible deployment scenarios, and the economic impacts of this deployment. As a research approaches used to estimate direct and indirect economic impacts of offshore renewable energy projects

  11. A master system for power system fault phenomena

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Myung Ho; Jang, Sang Ho; Hong, Joon Hee; Min, Wan Ki; Yoo, Chang Hwan [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    This report includes as follows - Real time digital simulator - Remote measuring, analyzing and reproducing system of power system fault data -Power system reduction method program using EMTP -Test system for protection device. (author). 22 refs., 38 figs.

  12. Fault Analysis of ITER Coil Power Supply System

    International Nuclear Information System (INIS)

    Song, In Ho; Jun, Tao; Benfatto, Ivone

    2009-01-01

    The ITER magnet coils are all designed using superconductors with high current carrying capability. The Toroidal Field (TF) coils operate in a steadystate mode with a current of 68 kA and discharge the stored energy in case of quench with using 9 interleaved Fast Discharge Units (FDUs). The Central Solenoid (CS) coils and Poloidal Field (PF) coils operate in a pulse mode with currents of up to 45 kA and require fast variation of currents inducing more than 10 kV during normal operation on the coil terminals using Switching Network (SN) systems (CSs, PF1 and 6) and Booster and VS converters (PF2 to 5), which are series connected to Main converters. SN and FDU systems comprise high current DC circuit breakers and resistors for generating high voltage (SN) and to dissipate magnetic energy (FDUs). High transient voltages can arise due to the switching operation of SN and FD and the characteristics of resistors and stray components of DC distribution systems. Also, faults in power supply control such as shorts or grounding faults can produce higher voltages between terminals and between terminal and ground. Therefore, the design of the coil insulation, coil terminal regions, feeders, feed throughs, pipe breaks and instrumentation must take account of these high voltages during normal and abnormal conditions. Voltage insulation level can be defined and it is necessary to test the coils at higher voltages, to be sure of reliable performance during the lifetime of operation. This paper describes the fault analysis of the TF, CS and PF coil power supply systems, taking account of the stray parameter of the power supply and switching systems and inductively coupled superconducting coil models. Resistor grounding systems are included in the simulation model and all fault conditions such as converter hardware and software faults, switching system hardware and software faults, DC short circuits and single grounding faults are simulated. The occurrence of two successive faults

  13. Nuclear plant requirements during power system restoration

    International Nuclear Information System (INIS)

    Adamski, G.; Jenkins, R.; Gill, P.

    1995-01-01

    This paper is one of a series presented on behalf of the System Operation Subcommittee with the intent of focusing industry attention on power system restoration issues. This paper discusses a number of nuclear power plant requirements that require special attention during power system restoration

  14. Options for Affordable Fission Surface Power Systems

    International Nuclear Information System (INIS)

    Houts, Mike; Gaddis, Steve; Porter, Ron; Van Dyke, Melissa; Martin, Jim; Godfroy, Tom; Bragg-Sitton, Shannon; Garber, Anne; Pearson, Boise

    2006-01-01

    Fission surface power systems could provide abundant power anywhere on the surface of the moon or Mars. Locations could include permanently shaded regions on the moon and high latitudes on Mars. To be fully utilized, however, fission surface power systems must be safe, have adequate performance, and be affordable. This paper discusses options for the design and development of such systems. (authors)

  15. Nova pulse power system description and status

    International Nuclear Information System (INIS)

    Holloway, R.W.; Whitham, K.; Merritt, B.T.; Gritton, D.G.; Oicles, J.A.

    1981-01-01

    The Nova laser system is designed to produce critical data in the nation's inertial confinement fusion effort. It is the world's largest peak power laser and presents various unique pulse power problems. In this paper, pulse power systems for this laser are described, the evolutionary points from prior systems are pointed out, and the current status of the hardware is given

  16. Power Electronics Control of Wind Energy in Distributed Power System

    DEFF Research Database (Denmark)

    Iov, Florin; Ciobotaru, Mihai; Blaabjerg, Frede

    2008-01-01

    is to change the electrical power production sources from the conventional, fossil (and short term) based energy sources to renewable energy resources. The other is to use high efficient power electronics in power generation, power transmission/distribution and end-user application. This paper discuss the most...... emerging renewable energy sources, wind energy, which by means of power electronics are changing from being a minor energy source to be acting as an important power source in the energy system. Power electronics is the enabling technology and the presentation will cover the development in wind turbine...... technology from kW to MW, discuss which power electronic solutions are most feasible and used today....

  17. The Optimization of power reactor control system

    International Nuclear Information System (INIS)

    Danupoyo, S.D.

    1997-01-01

    A power reactor is an important part in nuclear powered electrical plant systems. Success in controlling the power reactor will establish safety of the whole power plant systems. Until now, the power reactor has been controlled by a classical control system that was designed based on output feedback method. To meet the safety requirements that are now more restricted, the recently used power reactor control system should be modified. this paper describes a power reactor control system that is designed based on a state feedback method optimized with LQG (Linear-quadrature-gaussian) method and equipped with a state estimator. A pressurized-water type reactor has been used as the model. by using a point kinetics method with one group delayed neutrons. the result of simulation testing shows that the optimized control system can control the power reactor more effective and efficient than the classical control system

  18. 3.5 MeV pulsed power system for LIA injector

    International Nuclear Information System (INIS)

    Li Jin; Dai Guangsen; Liu Xiaoping; Zhang Kaizhi; Li Xin; Li Yuan; Xia Liansheng; Xie Min; Zhang Linwen; Deng Jianjun; Ding Bonan

    2005-01-01

    A 3.5 MeV injector for linear induction accelerator has been built up at Institute of Fluid Physics, China Academy of Engineering Physics. The injector is based on the principle of inductive adder. It consists of 12 induction cells. Seven induction cells are on the cathode stem side, which are connected in series, and provide about 2 MV on the cathode of the diode. The other five are connected in series on the anode stem side and provide about 1.5 MV on the anode of the diode. A 3.5 MV pulsed power system to provide energy for the injector has been designed, which consists of two Marx generators, 12 water insulated Blumleins, and trigger system. Charge voltage of each water insulated Blumlein is 200 kV. A 300 kV/90 ns high voltage pulse is fed into one induction cell since load impedance is higher. The pulsed power system can generate an intense electron beam with 2-3 kA. (authors)

  19. Vehicle-to-Grid Power in Danish Electric Power Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    The integration of renewable energy systems is often constrained by the variable nature of their output. This demands for the services of storing the electricity generated from most of the renewable energy sources. Vehicle-to-grid (V2G) power could use the inherent energy storage of electric...... vehicles and its quick response time to balance and stabilize a power system with fluctuating power. This paper outlines the use of battery electric vehicles in supporting large-scale integration of renewable energy in the Danish electric power systems. The reserve power requirements for a high renewable...... energy penetration could be met by an amount of V2G based electric vehicles less than 10% of the total vehicle need in Denmark. The participation of electric vehicle in ancillary services would earn significant revenues to the vehicle owner. The power balancing services of electric vehicles...

  20. Control of power plants and power systems. Proceedings

    International Nuclear Information System (INIS)

    Canales-Ruiz, R.

    1996-01-01

    The 88 papers in this volume constitute the proceedings of the International Federation of Automatic Control Symposium held in Mexico in 1995. The broad areas which they cover are: self tuning control; power plant operations; dynamic stability; fuzzy logic applications; power plants modelling; artificial intelligence applications; power plants simulation; voltage control; control of hydro electric units; state estimation; fault diagnosis and monitoring systems; system expansion and operation planning; security assessment; economic dispatch and optimal load flow; adaptive control; distribution; transient stability and preventive control; modelling and control of nuclear plant; knowledge data bases for automatic learning methods applied to power system dynamic security assessment; control of combined cycle units; power control centres. Separate abstracts have been prepared for the three papers relating to nuclear power plants. (UK)

  1. Study of the Atucha I nuclear power plant's residual heat removal system unavailability through the fault tree analysis and common cause failures

    International Nuclear Information System (INIS)

    Terrado, C.A.

    1991-06-01

    The present essay offers a comprehensive research of the Atucha I nuclear power plant's residual heat removal system unavailability, including Fault Tree Analysis and Common Cause Failures (CCF) treatment. The study is developed within the Event Tree perspective that considers the loss of external electrical power of the initiating event. The event was constructed by the Safety Evaluations Division of the Ezeiza Atomic Center in Argentina. According to the Event Tree, the research includes system demand during plant operation with 132 KV and emergency generation (Diesel motor generators). The system unavailability assessment is approached in two different ways: a) Considering independent failures only. b) Taking into account the existence of Common Cause Events, and modeling dependent failures. The Fault Tree quantification is played using the AIEA PSAPACK Code. The assessment data base is compiled from plant specific records and generic data bases like TECDOC 478. After Fault Tree model logic development, some general procedures used in common cause failures treating are applied to pick up another set of solutions. The results of the study are: a) Four Fault Trees have been developed to model the abovementioned system: 132 KV and emergency generation, both including and excluding CCF. b) The following unavailability values were obtained: 132 KV independent failures only: 7 10 -4 . Emergency generation independent failures only: 1.53 10 -2 . 132 KV dependent and independent failures: 3.6 10 -3 . Emergency generation dependent and independent failures: 1.74 10 -2 . The major conclusions obtained from the precedent results are: a) When using 132 KV system configuration, minimal cut sets involving common cause failures represents 81%from total system unavailability. b) The dependent failures treatment is an important task to be considered in safety assessments in order to reach more realistic values. (Author) [es

  2. Converters for Distributed Power Generation Systems

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Yang, Yongheng

    2015-01-01

    Power electronics technology has become the enabling technology for the integration of distributed power generation systems (DPGS) such as offshore wind turbine power systems and commercial photovoltaic power plants. Depending on the applications, a vast array of DPGS-based power converter...... topologies has been developed and more are coming into the market in order to achieve an efficient and reliable power conversion from the renewables. In addition, stringent demands from both the distribution system operators and the consumers have been imposed on the renewable-based DPGS. This article...... presents an overview of the power converters for the DPGS, mainly based on wind turbine systems and photovoltaic systems, covering a wide range of applications. Moreover, the modulation schemes and interfacing power filters for the power converters are also exemplified. Finally, the general control...

  3. Aberration-corrected STEM/TEM imaging at 15 kV

    International Nuclear Information System (INIS)

    Sasaki, Takeo; Sawada, Hidetaka; Hosokawa, Fumio; Sato, Yuta; Suenaga, Kazu

    2014-01-01

    The performance of aberration-corrected (scanning) transmission electron microscopy (S/TEM) at an accelerating voltage of 15 kV was evaluated in a low-voltage microscope equipped with a cold-field emission gun and a higher-order aberration corrector. Aberrations up to the fifth order were corrected by the aberration measurement and auto-correction system using the diffractogram tableau method in TEM and Ronchigram analysis in STEM. TEM observation of nanometer-sized particles demonstrated that aberrations up to an angle of 50 mrad were compensated. A TEM image of Si[110] exhibited lattice fringes with a spacing of 0.192 nm, and the power spectrum of the image showed spots corresponding to distances of 0.111 nm. An annular dark-field STEM image of Si[110] showed lattice fringes of (111) and (22¯0) planes corresponding to lattice distances of 0.314 nm and 0.192 nm, respectively. At an accelerating voltage of 15 kV, the developed low-voltage microscope achieved atomic-resolution imaging with a small chromatic aberration and a large uniform phase. - Highlights: • Aberration-corrected STEM/TEM imaging at 15 kV demonstrated lattice fringes of Si[110] single crystal with a spacing of 0.192 nm. • To achieve this performance at a lower accelerating voltage, uniform phase area over 50 mrad is mandatory in Ronchigram and Diffractogram tableau. • This means a higher-order aberration of six-fold astigmatism should be compensated. • In addition, decreasing the effect of chromatic aberration plays an important role for improving the performance of linear scattering component at 15 kV TEM

  4. Integrating wind power in the (French) power system

    International Nuclear Information System (INIS)

    Pellen, A.

    2007-03-01

    RTE and EDF have no other technological option than to restrain the contribution of the French wind power fleet to base-load generation where it comes in direct competition with the nuclear power plants. The author aims to explain this situation and answer the following questions. Why the fossil fueled reactor fleet in France will not be affected by an evolution of the wind power capacity? Why, in France electric power generation-demand SYSTEM wind power cannot be a substitute for fossil fueled thermal units? (A.L.B.)

  5. Back-to-Back Energization of a 60kV Cable Network - Inrush Currents Phenomenon

    DEFF Research Database (Denmark)

    Faria da Silva, Filipe; Bak, Claus Leth; Hansen, M. Lind

    2010-01-01

    On November 2008 the Danish government decided that all Danish transmission lines with a rated voltage equal to and below 150kV must be put underground, in order to reduce the visual pollution caused by Overhead Lines. This decision will lead to a massive use of underground cables in the Danish...... Network, and force a change in the approach used until now when planning, analyzing and operating electrical power systems. One problem that might arise is the energization of cables in parallel, as this operation may originate high inrush currents, which represent a risk to the circuit breakers connected...

  6. Outlook for use of 10 kV voltage in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Voloshchenko, N.I.; Nabokov, E.P.; Razumnyy, Yu.T.

    1983-01-01

    Based on technical-economic studies of the models of the plans for electricity supply, the economic expediency is shown of comprehensive implementation of measures for transition of high-voltage equipment of the mines to voltage of 10 kV with simultaneous improvement in the permissible power of short circuiting to 150 MV X A. Technical problems were examined which are associated with creation of explosion-safe electrical equipment, corresponding to the new technical requirements for the system of electricity supply of the coal mine.

  7. Active and reactive power support of MV distribution systems using battery energy storage

    DEFF Research Database (Denmark)

    Wang, Jiawei; Hashemi Toghroljerdi, Seyedmostafa; You, Shi

    2017-01-01

    shaving and voltage support service from the perspective of Distribution System Operators (DSOs). An active power support algorithm is implemented and the effects of various load profiles as well as different Photovoltaic (PV) penetration scenarios on the operation of BESS and the optimal BESS converter......Adoption of Battery Energy Storage Systems (BESSs) for provision of grid services is increasing. This paper investigates the applications of BESS for the grid upgrade deferral and voltage support of Medium Voltage (MV) distribution systems. A BESS is modelled in Matlab/Simulink to perform peak load...... size for peak load shaving are investigated. The BESS annual lifetime degradation is also estimated using a rainflow counting algorithm. A reactive power support algorithm embedded with Q-U droop control is proposed in order to reduce the voltage drop in a part of 10 kV distribution network of Nordhavn...

  8. Power Quality Improvements in Wind Diesel Power Generation System

    Directory of Open Access Journals (Sweden)

    Omar Feddaoui

    2015-08-01

    Full Text Available Generation of electricity using diesel is costly for small remote isolated communities. At remote location electricity generation from renewable energy such as wind can help reduce the overall operating costs by reducing the fuel costs. However, the penetration of wind power into small diesel-based grids is limited because of its effect on power quality and reliability. This paper focuses on the combination of Wind Turbine and Diesel Generator systems for sustained power generation, to improve the power quality of wind generation system. The performances of the optimal control structure are assessed and discussed by means of a set of simulations.

  9. Reliability of emergency ac power systems at nuclear power plants

    International Nuclear Information System (INIS)

    Battle, R.E.; Campbell, D.J.

    1983-07-01

    Reliability of emergency onsite ac power systems at nuclear power plants has been questioned within the Nuclear Regulatory Commission (NRC) because of the number of diesel generator failures reported by nuclear plant licensees and the reactor core damage that could result from diesel failure during an emergency. This report contains the results of a reliability analysis of the onsite ac power system, and it uses the results of a separate analysis of offsite power systems to calculate the expected frequency of station blackout. Included is a design and operating experience review. Eighteen plants representative of typical onsite ac power systems and ten generic designs were selected to be modeled by fault trees. Operating experience data were collected from the NRC files and from nuclear plant licensee responses to a questionnaire sent out for this project

  10. Space Weather Effects on Current and Future Electric Power Systems

    Science.gov (United States)

    Munoz, D.; Dutta, O.; Tandoi, C.; Brandauer, W.; Mohamed, A.; Damas, M. C.

    2016-12-01

    This work addresses the effects of Geomagnetic Disturbances (GMDs) on the present bulk power system as well as the future smart grid, and discusses the mitigation of these geomagnetic impacts, so as to reduce the vulnerabilities of the electric power network to large space weather events. Solar storm characterized by electromagnetic radiation generates geo-electric fields that result in the flow of Geomagnetically Induced Currents (GICs) through the transmission lines, followed by transformers and the ground. As the ground conductivity and the power network topology significantly vary with the region, it becomes imperative to estimate of the magnitude of GICs for different places. In this paper, the magnitude of GIC has been calculated for New York State (NYS) with the help of extensive modelling of the whole NYS electricity transmission network using real data. Although GIC affects only high voltage levels, e.g. above 300 kV, the presence of coastline in NYS makes the low voltage transmission lines also susceptible to GIC. Besides this, the encroachment of technologies pertaining to smart grid implementation, such as Phasor Measurement Units (PMUs), Microgrids, Flexible AC Transmission System (FACTS), and Information and Communication Technology (ICT) have been analyzed for GMD impacts. Inaccurate PMU results due to scintillation of GPS signals that are affected by electromagnetic interference of solar storm, presence of renewable energy resources in coastal areas that are more vulnerable to GMD, the ability of FACTS devices to either block or pave new path for GICs and so on, shed some light on impacts of GMD on smart grid technologies.

  11. GPS synchronized power system phase angle measurements

    Science.gov (United States)

    Wilson, Robert E.; Sterlina, Patrick S.

    1994-09-01

    This paper discusses the use of Global Positioning System (GPS) synchronized equipment for the measurement and analysis of key power system quantities. Two GPS synchronized phasor measurement units (PMU) were installed before testing. It was indicated that PMUs recorded the dynamic response of the power system phase angles when the northern California power grid was excited by the artificial short circuits. Power system planning engineers perform detailed computer generated simulations of the dynamic response of the power system to naturally occurring short circuits. The computer simulations use models of transmission lines, transformers, circuit breakers, and other high voltage components. This work will compare computer simulations of the same event with field measurement.

  12. Computer-aided power systems analysis

    CERN Document Server

    Kusic, George

    2008-01-01

    Computer applications yield more insight into system behavior than is possible by using hand calculations on system elements. Computer-Aided Power Systems Analysis: Second Edition is a state-of-the-art presentation of basic principles and software for power systems in steady-state operation. Originally published in 1985, this revised edition explores power systems from the point of view of the central control facility. It covers the elements of transmission networks, bus reference frame, network fault and contingency calculations, power flow on transmission networks, generator base power setti

  13. Hvor fosser kvælstoffet hen?

    DEFF Research Database (Denmark)

    Larsen, Torben

    Der har i Ingeniøren inden i et par måneder kunne læses adskillelige ivrige indlæg om de danske fjordes evne til at fjerne kvælstof. Kvælstof fosser ud af fjordene? lød en af de første overskrifter. Få uger efter blev det stik modsatte synspunkt fremført under overskriften Fjordene holder på kvæl...

  14. Compensating active power imbalances in power system with large-scale wind power penetration

    DEFF Research Database (Denmark)

    Basit, Abdul; Hansen, Anca Daniela; Altin, Müfit

    2016-01-01

    Large-scale wind power penetration can affectthe supply continuity in the power system. This is a matterof high priority to investigate, as more regulating reservesand specified control strategies for generation control arerequired in the future power system with even more highwind power penetrat...

  15. Digital simulation of power electronic systems

    International Nuclear Information System (INIS)

    Mehring, P.; Jentsch, W.; John, G.; Kraemer, D.

    1981-01-01

    The following paper contains the final report on the NETSIM-Project. The purpose of this project is to develop a special digital simulation system, which could serve as a base for routine application of simulation in planning and development of power electronic systems. The project is realized in two steps. First a basic network analysis system is established. With this system the basic models and methods in treating power electronic networks could be probed. The resulting system is then integrated into a general digital simulation system for continous systems (CSSL-System). This integrated simulation system allows for convenient modeling and simulation of power electronic systems. (orig.) [de

  16. Grid-Tied Photovoltaic Power System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2011-01-01

    A grid-tied photovoltaic (PV) power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. Operating costs of a PV power system are low compared to conventional power technologies. This method can displace the highest-cost electricity during times of peak demand in most climatic regions, and thus reduce grid loading. Net metering is often used, in which independent power producers such as PV power systems are connected to the utility grid via the customers main service panels and meters. When the PV power system is generating more power than required at that location, the excess power is provided to the utility grid. The customer pays the net of the power purchased when the on-site power demand is greater than the onsite power production, and the excess power is returned to the utility grid. Power generated by the PV system reduces utility demand, and the surplus power aids the community. Modern PV panels are readily available, reliable, efficient, and economical, with a life expectancy of at least 25 years. Modern electronics have been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy equal to the modern PV panels. The grid-tied PV power system was successfully designed and developed, and this served to validate the basic principles developed, and the theoretical work that was performed. Grid-tied PV power systems are reliable, maintenance- free, long-life power systems, and are of significant value to NASA and the community. Of particular value are the analytical tools and capabilities that have been successfully developed. Performance predictions can be made confidently for grid-tied PV systems of various scales. The work was done under the NASA Hybrid Power Management (HPM

  17. Design study of an AC power supply system in JT-60SA

    International Nuclear Information System (INIS)

    Shimada, Katsuhiro; Baulaigue, Olivier; Cara, Philippe; Coletti, Alberto; Coletti, Roberto; Matsukawa, Makoto; Terakado, Tsunehisa; Yamauchi, Kunihito

    2011-01-01

    In the initial research phase of JT-60SA, which is the International Thermonuclear Experimental Reactor (ITER) satellite Tokamak with superconducting toroidal and poloidal magnetic field coils, the plasma heating operation of 30 MW-60 s or 20 MW-100 s is planned for 5.5 MA single null divertor plasmas. To achieve this operation, AC power source of the medium voltage of 18 kV and ∼7 GJ has to be provided in total to the poloidal field coil power supplies and additional heating devices such as neutral beam injection (NBI) and electron cyclotron radio frequency (ECRF). In this paper, the proposed AC power supply system in JT-60SA was estimated from the view point of available power, and harmonic currents based on the standard plasma operation scenario during the initial research phase. This AC power supply system consists of the reused JT-60 power supply facilities including motor generators with flywheel, AC breakers, harmonic filters, etc., to make it cost effective. In addition, the conceptual design of the upgraded AC power supply system for the ultimate heating power of 41 MW-100 s in the extended research phase is also described.

  18. Energy efficiency comparison between geothermal power systems

    Directory of Open Access Journals (Sweden)

    Luo Chao

    2017-01-01

    Full Text Available The geothermal water which can be considered for generating electricity with the temperature ranging from 80℃ to 150℃ in China because of shortage of electricity and fossil energy. There are four basic types of geothermal power systems: single flash, double flash, binary cycle, and flash-binary system, which can be adapted to geothermal energy utilization in China. The paper discussed the performance indices and applicable conditions of different power system. Based on physical and mathematical models, simulation result shows that, when geofluid temperature ranges from 100℃ to 130℃, the net power output of double flash power is bigger than flash-binary system. When the geothermal resource temperature is between 130℃ and 150℃, the net power output of flash-binary geothermal power system is higher than double flash system by the maximum value 5.5%. However, the sum water steam amount of double flash power system is 2 to 3 times larger than flash-binary power system, which will cause the bigger volume of equipment of power system. Based on the economy and power capacity, it is better to use flash-binary power system when the geofluid temperature is between 100℃ and 150℃.

  19. Maximum Safety Regenerative Power Tracking for DC Traction Power Systems

    Directory of Open Access Journals (Sweden)

    Guifu Du

    2017-02-01

    Full Text Available Direct current (DC traction power systems are widely used in metro transport systems, with running rails usually being used as return conductors. When traction current flows through the running rails, a potential voltage known as “rail potential” is generated between the rails and ground. Currently, abnormal rises of rail potential exist in many railway lines during the operation of railway systems. Excessively high rail potentials pose a threat to human life and to devices connected to the rails. In this paper, the effect of regenerative power distribution on rail potential is analyzed. Maximum safety regenerative power tracking is proposed for the control of maximum absolute rail potential and energy consumption during the operation of DC traction power systems. The dwell time of multiple trains at each station and the trigger voltage of the regenerative energy absorbing device (READ are optimized based on an improved particle swarm optimization (PSO algorithm to manage the distribution of regenerative power. In this way, the maximum absolute rail potential and energy consumption of DC traction power systems can be reduced. The operation data of Guangzhou Metro Line 2 are used in the simulations, and the results show that the scheme can reduce the maximum absolute rail potential and energy consumption effectively and guarantee the safety in energy saving of DC traction power systems.

  20. Loss Characteristics of 6.5 kV RC-IGBT Applied to a Traction Converter

    Directory of Open Access Journals (Sweden)

    Xianjin Huang

    2017-07-01

    Full Text Available 6.5 kV level IGBT (Insulated Gate Bipolar Transistor modules are widely applied in megawatt locomotive (MCUs traction converters, to achieve an upper 3.5 kV DC link, which is beneficial for decreasing power losses and increasing the power density. Reverse Conducting IGBT (RC-IGBT constructs the conventional IGBT function and freewheel diode function in a single chip, which has a greater flow ability in the same package volume. In the same cooling conditions, RC-IGBT allows for a higher operating temperature. In this paper, a mathematic model is developed, referring to the datasheets and measurement data, to study the 6.5 kV/1000 A RC-IGBT switching features. The relationship among the gate desaturated pulse, conducting losses, and recovery losses is discussed. Simulations and tests were carried out to consider the influence of total losses on the different amplitudes and durations of the desaturated pulse. The RC-IGBT traction converter system with gate pulse desaturated control is built, and the simulation and measurements show that the total losses of RC-IGBT with desaturated control decreased comparing to the RC-IGBT without desaturated control or conventional IGBT. Finally, a proportional small power platform is developed, and the test results prove the correction of the theory analysis.

  1. Integration of stochastic generation in power systems

    NARCIS (Netherlands)

    Papaefthymiou, G.; Schavemaker, P.H.; Sluis, van der L.; Kling, W.L.; Kurowicka, D.; Cooke, R.M.

    2006-01-01

    Stochastic generation, i.e., electrical power production by an uncontrolled primary energy source, is expected to play an important role in future power systems. A new power system structure is created due to the large-scale implementation of this small-scale, distributed, non-dispatchable

  2. High power operation of the polyphase resonant converter modulator system for the spallation neutron source linear accelerator

    CERN Document Server

    Reass, W A; Baca, D M; Doss, J D; Gonzáles, J M; Gribble, R F; Trujillo, P G

    2003-01-01

    The spallation neutron source (SNS) is a new 1.4 MW average power beam, 1 GeV accelerator being built at Oak Ridge national laboratory. The accelerator requires 15 "long-pulse" converter-modulator stations each providing a maximum of 11 MW pulses with a 1.1 MW average power. Two variants of the converter-modulator are utilized, an 80 kV and a 140 kV design, the voltage dependant on the type of klystron load. The converter-modulator can be described as a resonant zero-voltage- switching polyphase boost inverter. As noted in Figure 1, each converter modulator derives its buss voltage from a standard 13.8 kV to 2100 Y (1.5 MVA) substation cast-core transformer. The substation also contains harmonic traps and filters to accommodate IEEE 519 and 141 regulations. Each substation is followed by an SCR preregulator to accommodate system voltage changes from no load to full load, in addition to providing a soft-start function. Energy storage and filtering is provided by special low inductance self-clearing metallized ...

  3. Optimizing the switching time for 400 kV SF6 circuit breakers

    Science.gov (United States)

    Ciulica, D.

    2018-01-01

    This paper presents real-time voltage and current analysis for optimizing the wave switching point of the circuit breaker SF6. Circuit Breaker plays an important role in power systems. It provides protection for equipment in embedded stations in transport networks. SF6 Circuit Breaker is very important equipment in Power Systems, which is used for up to 400 kV due to its excellent performance. The controlled switching is used to eliminate transient modes and electrodynamic and dielectric charges in the network at manual switching of capacitor, shunt reactors and power transformers. These effects reduce the reliability and lifetime of the equipment installed on the network, or may lead to erroneous protection.

  4. Power processing systems for ion thrusters.

    Science.gov (United States)

    Herron, B. G.; Garth, D. R.; Finke, R. C.; Shumaker, H. A.

    1972-01-01

    The proposed use of ion thrusters to fulfill various communication satellite propulsion functions such as east-west and north-south stationkeeping, attitude control, station relocation and orbit raising, naturally leads to the requirement for lightweight, efficient and reliable thruster power processing systems. Collectively, the propulsion requirements dictate a wide range of thruster power levels and operational lifetimes, which must be matched by the power processing. This paper will discuss the status of such power processing systems, present system design alternatives and project expected near future power system performance.

  5. New Generation Power System for Space Applications

    Science.gov (United States)

    Jones, Loren; Carr, Greg; Deligiannis, Frank; Lam, Barbara; Nelson, Ron; Pantaleon, Jose; Ruiz, Ian; Treicler, John; Wester, Gene; Sauers, Jim; hide

    2004-01-01

    The Deep Space Avionics (DSA) Project is developing a new generation of power system building blocks. Using application specific integrated circuits (ASICs) and power switching modules a scalable power system can be constructed for use on multiple deep space missions including future missions to Mars, comets, Jupiter and its moons. The key developments of the DSA power system effort are five power ASICs and a mod ule for power switching. These components enable a modular and scalab le design approach, which can result in a wide variety of power syste m architectures to meet diverse mission requirements and environments . Each component is radiation hardened to one megarad) total dose. The power switching module can be used for power distribution to regular spacecraft loads, to propulsion valves and actuation of pyrotechnic devices. The number of switching elements per load, pyrotechnic firin gs and valve drivers can be scaled depending on mission needs. Teleme try data is available from the switch module via an I2C data bus. The DSA power system components enable power management and distribution for a variety of power buses and power system architectures employing different types of energy storage and power sources. This paper will describe each power ASIC#s key performance characteristics as well a s recent prototype test results. The power switching module test results will be discussed and will demonstrate its versatility as a multip urpose switch. Finally, the combination of these components will illu strate some of the possible power system architectures achievable fro m small single string systems to large fully redundant systems.

  6. Self-Oscillating Wireless Power Transfer Systems

    OpenAIRE

    Tretyakov, Sergei A.; Simovski, Constantin R.; Valagiannopoulos, Constantinos A.; Ra'di, Younes

    2017-01-01

    Conventional wireless power transfer systems consist of a microwave power generator and transmitter located at one place and a microwave power receiver located at a distance. Here we show that wireless power transfer can be realized as a single distributed microwave generator with an over-the-air feedback, so that the microwave power is generated directly at the place where the energy needs to be delivered. We demonstrate that the use of this paradigm increases efficiency and dramatically red...

  7. Power electronics for renewable energy systems

    DEFF Research Database (Denmark)

    Iov, Florin; Blaabjerg, Frede

    2009-01-01

    sources from the conventional, fossil (and short term) based energy sources to renewable energy resources. Another is to use high efficient power electronics in power generation, power transmission/distribution and end-user application. This paper discuss some of the most emerging renewable energy sources......, wind energy and photovoltaics, which by means of power electronics are changing from being minor energy sources to be acting as important power sources in the energy system....

  8. Operating experience with the 50 MeV 10kA ATA power conditioning system

    International Nuclear Information System (INIS)

    Rogers, D.; Lee, F.D.; Newton, M.; Reginato, L.L.; Smith, M.E.

    1984-06-01

    The Advanced Test Accelerator (ATA) has been operational for over one year and has achieved full parameters in the power conditioning system. The pulsed power system has been previously described, however, during the past year of operation a considerable amount of statistical data has been accumulated on the 211 gas blown spark gaps that perform the main switching function in the ATA. These spark gaps were designed for 250kV, 40 kA and 70ns pulse. The parameter that made this spark gap somewhat unique was the requirement that it be able to provide a burst of ten pulses at one kilohertz with an average repetition rate of 5Hz. 2 references, 7 figures

  9. Feasibility study of wireless power transmission systems

    Science.gov (United States)

    Robinson, W. J., Jr.

    1968-01-01

    Wireless microwave or laser energy transfers power from a manned earth-orbiting central station to unmanned astronomical substations. More efficient systems are required for the microwave power transmission.

  10. Probabilistic Fault Diagnosis in Electrical Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft. This paper discusses our development of a diagnostic capability for an electrical power...

  11. Power system with an integrated lubrication circuit

    Science.gov (United States)

    Hoff, Brian D [East Peoria, IL; Akasam, Sivaprasad [Peoria, IL; Algrain, Marcelo C [Peoria, IL; Johnson, Kris W [Washington, IL; Lane, William H [Chillicothe, IL

    2009-11-10

    A power system includes an engine having a first lubrication circuit and at least one auxiliary power unit having a second lubrication circuit. The first lubrication circuit is in fluid communication with the second lubrication circuit.

  12. Smart Power Supply for Battery-Powered Systems

    Science.gov (United States)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have

  13. Power system damping - Structural aspects of controlling active power

    Energy Technology Data Exchange (ETDEWEB)

    Samuelsson, O.

    1997-04-01

    Environmental and economical aspects make it difficult to build new power lines and to reinforce existing ones. The continued growth in demand for electric power must therefore to a great extent be met by increased loading of available lines. A consequence is that power system damping is reduced, leading to a risk of poorly damped power oscillations between the generators. This thesis proposes the use of controlled active loads to increase damping of such electro-mechanical oscillations. The focus is on structural aspects of controller interaction and of sensor and actuator placement. On-off control based on machine frequency in a single machine infinite bus system is analysed using energy function analysis and phase plane plots. An on-off controller with estimated machine frequency as input has been implemented. At a field test it damped oscillations of a 0.9 MW hydro power generator by controlling a 20kW load. The linear analysis uses two power system models with three and twenty-three machines respectively. Each damper has active power as output and local bus frequency or machine frequency as input. The power system simulator EUROSTAG is used both for generation of the linearized models and for time simulations. Measures of active power mode controllability and phase angle mode observability are obtained from the eigenvectors of the differential-algebraic models. The geographical variation in the network of these quantities is illustrated using the resemblance to bending modes of flexible mechanical structures. Eigenvalue sensitivities are used to determine suitable damper locations. A spring-mass equivalent to an inter-area mode provides analytical expressions, that together with the concept of impedance matching explain the structural behaviour of the power systems. For large gains this is investigated using root locus plots. 64 refs, 99 figs, 20 tabs

  14. Development of an autonomous power system testbed

    International Nuclear Information System (INIS)

    Barton, J.R.; Adams, T.; Liffring, M.E.

    1985-01-01

    A power system testbed has been assembled to advance the development of large autonomous electrical power systems required for the space station, spacecraft, and aircraft. The power system for this effort was designed to simulate single- or dual-bus autonomous power systems, or autonomous systems that reconfigure from a single bus to a dual bus following a severe fault. The approach taken was to provide a flexible power system design with two computer systems for control and management. One computer operates as the control system and performs basic control functions, data and command processing, charge control, and provides status to the second computer. The second computer contains expert system software for mission planning, load management, fault identification and recovery, and sends load and configuration commands to the control system

  15. Design and development of 500 m long HTS cable system in the KEPCO power grid, Korea

    Science.gov (United States)

    Sohn, S. H.; Lim, J. H.; Yang, B. M.; Lee, S. K.; Jang, H. M.; Kim, Y. H.; Yang, H. S.; Kim, D. L.; Kim, H. R.; Yim, S. W.; Won, Y. J.; Hwang, S. D.

    2010-11-01

    In Korea, two long-term field demonstrations for high temperature superconducting (HTS) cable have been carried out for several years; Korea Electric Power Corporation (KEPCO) and LS Cable Ltd. (LSC) independently. Encouraged at the result of the projects performed in parallel, a new project targeting the real grid operation was launched in the fourth quarter of 2008 with the Korean government's financial support. KEPCO and LSC are jointly collaborating in the selection of substation, determination of cable specification, design of cryogenic system, and the scheme of protection coordination. A three phase 500 m long HTS cable at a distribution level voltage of 22.9 kV is to be built at 154/22.9 kV Icheon substation located in near Seoul. A hybrid cryogenic system reflecting the contingency plan is being designed including cryocoolers. The HTS cable system will be installed in the second quarter of 2010, being commissioned by the fall of 2010. This paper describes the objectives of the project and design issues of the cable and cryogenic system in detail.

  16. Power source system for nuclear fusion

    International Nuclear Information System (INIS)

    Nakagawa, Satoshi.

    1975-01-01

    Object: When using an external system power source and an exclusive power source in a power source circuit for supplying power to the coils of a nuclear fusion apparatus, to minimize the capacity of the exclusive power source and provide an economical power source circuit construction. Structure: In the initial stage of the power supply, rectifying means provided in individual blocks are connected in parallel on the AC side, and power is supplied to the coils of the nuclear fusion apparatus from an external system power source with the exclusive power source held in the disconnected state. Further, at an instant when the limit of permissible input is reached, the afore-mentioned parallel circuit consisting of rectifying means is disconnected, while at the same time the exclusive power source is connected to the input side of the rectifying means provided in a block corresponding to the exclusive power source side, thereby supplying power to the coils of the nuclear fusion apparatus from both the external system power source and exclusive power source. (Kamimura, M.)

  17. FY 1998 Report on development of large-scale wind power generation systems. Part 2. Operational research on large-scale wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. 2. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The on-the-spot surveys are conducted and related information is collected for current status of wind power generators connected to power grid systems and simulation techniques therefor in the USA and European countries. In Denmark, the grid system to which wind power generators are connected is a 10kV radiation type system, by which these generators are connected to general consumers. Power quality is investigated by the programs developed by DEFU (Danske Elvarkers Forening Udredning). The German's Norderland Wind Park has the largest capacity in Europe with 35 units of 1.5MW generators. They are connected to a 110kV grind system via ISOREE to control disturbances to the commercial grid system. The USA, used to have the world largest wind power generation capacity, is now plays second fiddle to Germany whose capacity has now exceeded 2,000MW. The country is now seeing the second rush for construction of wind power generators, planning to have a new capacity of 570MW in 1998. Information is also collected from other countries or organizations, including the Netherlands, WREC, Italy and Spain. (NEDO)

  18. FY 1998 Report on development of large-scale wind power generation systems. Part 2. Operational research on large-scale wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. 2. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The on-the-spot surveys are conducted and related information is collected for current status of wind power generators connected to power grid systems and simulation techniques therefor in the USA and European countries. In Denmark, the grid system to which wind power generators are connected is a 10kV radiation type system, by which these generators are connected to general consumers. Power quality is investigated by the programs developed by DEFU (Danske Elvarkers Forening Udredning). The German's Norderland Wind Park has the largest capacity in Europe with 35 units of 1.5MW generators. They are connected to a 110kV grind system via ISOREE to control disturbances to the commercial grid system. The USA, used to have the world largest wind power generation capacity, is now plays second fiddle to Germany whose capacity has now exceeded 2,000MW. The country is now seeing the second rush for construction of wind power generators, planning to have a new capacity of 570MW in 1998. Information is also collected from other countries or organizations, including the Netherlands, WREC, Italy and Spain. (NEDO)

  19. Real-time estimation of prostate tumor rotation and translation with a kV imaging system based on an iterative closest point algorithm

    International Nuclear Information System (INIS)

    Tehrani, Joubin Nasehi; O’Brien, Ricky T; Keall, Paul; Poulsen, Per Rugaard

    2013-01-01

    Previous studies have shown that during cancer radiotherapy a small translation or rotation of the tumor can lead to errors in dose delivery. Current best practice in radiotherapy accounts for tumor translations, but is unable to address rotation due to a lack of a reliable real-time estimate. We have developed a method based on the iterative closest point (ICP) algorithm that can compute rotation from kilovoltage x-ray images acquired during radiation treatment delivery. A total of 11 748 kilovoltage (kV) images acquired from ten patients (one fraction for each patient) were used to evaluate our tumor rotation algorithm. For each kV image, the three dimensional coordinates of three fiducial markers inside the prostate were calculated. The three dimensional coordinates were used as input to the ICP algorithm to calculate the real-time tumor rotation and translation around three axes. The results show that the root mean square error was improved for real-time calculation of tumor displacement from a mean of 0.97 mm with the stand alone translation to a mean of 0.16 mm by adding real-time rotation and translation displacement with the ICP algorithm. The standard deviation (SD) of rotation for the ten patients was 2.3°, 0.89° and 0.72° for rotation around the right–left (RL), anterior–posterior (AP) and superior–inferior (SI) directions respectively. The correlation between all six degrees of freedom showed that the highest correlation belonged to the AP and SI translation with a correlation of 0.67. The second highest correlation in our study was between the rotation around RL and rotation around AP, with a correlation of −0.33. Our real-time algorithm for calculation of rotation also confirms previous studies that have shown the maximum SD belongs to AP translation and rotation around RL. ICP is a reliable and fast algorithm for estimating real-time tumor rotation which could create a pathway to investigational clinical treatment studies requiring

  20. Keys to success for wind power in isolated power systems

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, J C; Lundsager, P; Bindner, H; Hansen, L; Frandsen, S [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark)

    1999-03-01

    It is generally expected that wind power could contribute significantly to the electricity supply in power systems of small and medium sized isolated communities. The market for such applications of wind power has not yet materialized. Wind power in isolated power systems have the main market potentials in developing countries. The money available world-wide for this technological development is limited and the necessary R and D and pilot programmes have difficult conditions. Consequently, technology developed exclusively for developing countries rarely becomes attractive for consumers, investors and funding agencies. A Danish research project is aimed at studying development of methods and guidelines rather than `universal solutions` for the use of wind energy in isolated communities. This paper report on the findings of the project regarding barriers removal and engineering methods development, with a focus on analysis and specification of user demand and priorities, numerical modeling requirements as well as wind power impact on power quality and power system operation. Input will be provided on these subjects for establishing of common guidelines on relevant technical issues, and thereby enabling the making of trustworthy project preparation studies. (au) EFP-97. 12 refs.

  1. Multiobjective clearing of reactive power market in deregulated power systems

    International Nuclear Information System (INIS)

    Rabiee, A.; Shayanfar, H.; Amjady, N.

    2009-01-01

    This paper presents a day-ahead reactive power market which is cleared in the form of multiobjective context. Total payment function (TPF) of generators, representing the payment paid to the generators for their reactive power compensation, is considered as the main objective function of reactive power market. Besides that, voltage security margin, overload index, and also voltage drop index are the other objective functions of the optimal power flow (OPF) problem to clear the reactive power market. A Multiobjective Mathematical Programming (MMP) formulation is implemented to solve the problem of reactive power market clearing using a fuzzy approach to choose the best compromise solution according to the specific preference among various non-dominated (pareto optimal) solutions. The effectiveness of the proposed method is examined based on the IEEE 24-bus reliability test system (IEEE 24-bus RTS). (author)

  2. Overvoltages transferred from a network of 220 kV to 15.65 kV level of the step-up transformer in HPP 'Bajina Bašta'

    Directory of Open Access Journals (Sweden)

    Vukelja Petar

    2011-01-01

    Full Text Available The paper presents the results of research in lightning surge waves and switching overvoltages transferred from a network of 220 kV to the 15.65 kV level of the step-up transformer in HPP 'Bajina Bašta'. Analysis of survey results lead to conclusion that transferred overvoltages can endanger 15.65 kV transformer windings and stator winding insulation. It was therefore suggested for the protection of the 15.65 kV isolation to install metal oxide surge arresters at a suitable place between the power generator bus bars and earthing.

  3. On energy efficient power allocation for power-constrained systems

    KAUST Repository

    Sboui, Lokman

    2014-09-01

    Recently, the energy efficiency (EE) has become an important factor when designing new wireless communication systems. Due to economic and environmental challenges, new trends and efforts are oriented toward “green” communication especially for energy-constrained applications such as wireless sensors network and cognitive radio. To this end, we analyze the power allocation scheme that maximizes the EE defined as rate over the total power including circuit power. We derive an explicit expression of the optimal power with instantaneous channel gain based on EE criterion. We show that the relation between the EE and the spectral efficiency (SE) when the optimal power is adopted is strictly increasing in contrast with the SE-EE trade-off discussed in the literature. We also solve a non-convex problem and compute explicitly the optimal power for ergodic EE under either a peak or an average power constraint. When the instantaneous channel is not available, we provide the optimal power equation and compute simple sub-optimal power. In the numerical results, we show that the sup-optimal solution is very close to the optimal solution. In addition, we show that the absence of the channel state information (CSI) only affects the EE and the SE performances at high power regime compared to the full CSI case.

  4. Survey of magnetic fields near BPA 230-kV and 500-kV transmission lines

    International Nuclear Information System (INIS)

    Perrin, N.; Aggarwal, R.P.

    1991-01-01

    The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs

  5. Power systems signal processing for smart grids

    CERN Document Server

    Ribeiro, Paulo Fernando; Ribeiro, Paulo Márcio; Cerqueira, Augusto Santiago

    2013-01-01

    With special relation to smart grids, this book provides clear and comprehensive explanation of how Digital Signal Processing (DSP) and Computational Intelligence (CI) techniques can be applied to solve problems in the power system. Its unique coverage bridges the gap between DSP, electrical power and energy engineering systems, showing many different techniques applied to typical and expected system conditions with practical power system examples. Surveying all recent advances on DSP for power systems, this book enables engineers and researchers to understand the current state of the art a

  6. Study of aircraft electrical power systems

    Science.gov (United States)

    1972-01-01

    The formulation of a philosophy for devising a reliable, efficient, lightweight, and cost effective electrical power system for advanced, large transport aircraft in the 1980 to 1985 time period is discussed. The determination and recommendation for improvements in subsystems and components are also considered. All aspects of the aircraft electrical power system including generation, conversion, distribution, and utilization equipment were considered. Significant research and technology problem areas associated with the development of future power systems are identified. The design categories involved are: (1) safety-reliability, (2) power type, voltage, frequency, quality, and efficiency, (3) power control, and (4) selection of utilization equipment.

  7. Direct current power delivery system and method

    Science.gov (United States)

    Zhang, Di; Garces, Luis Jose; Dai, Jian; Lai, Rixin

    2016-09-06

    A power transmission system includes a first unit for carrying out the steps of receiving high voltage direct current (HVDC) power from an HVDC power line, generating an alternating current (AC) component indicative of a status of the first unit, and adding the AC component to the HVDC power line. Further, the power transmission system includes a second unit for carrying out the steps of generating a direct current (DC) voltage to transfer the HVDC power on the HVDC power line, wherein the HVDC power line is coupled between the first unit and the second unit, detecting a presence or an absence of the added AC component in the HVDC power line, and determining the status of the first unit based on the added AC component.

  8. The electrically silent Kv6.4 subunit confers hyperpolarized gating charge movement in Kv2.1/Kv6.4 heterotetrameric channels.

    Directory of Open Access Journals (Sweden)

    Elke Bocksteins

    Full Text Available The voltage-gated K(+ (Kv channel subunit Kv6.4 does not form functional homotetrameric channels but co-assembles with Kv2.1 to form functional Kv2.1/Kv6.4 heterotetrameric channels. Compared to Kv2.1 homotetramers, Kv6.4 exerts a ~40 mV hyperpolarizing shift in the voltage-dependence of Kv2.1/Kv6.4 channel inactivation, without a significant effect on activation gating. However, the underlying mechanism of this Kv6.4-induced modulation of Kv2.1 channel inactivation, and whether the Kv6.4 subunit participates in the voltage-dependent gating of heterotetrameric channels is not well understood. Here we report distinct gating charge movement of Kv2.1/Kv6.4 heterotetrameric channels, compared to Kv2.1 homotetramers, as revealed by gating current recordings from mammalian cells expressing these channels. The gating charge movement of Kv2.1/Kv6.4 heterotetrameric channels displayed an extra component around the physiological K(+ equilibrium potential, characterized by a second sigmoidal relationship of the voltage-dependence of gating charge movement. This distinct gating charge displacement reflects movement of the Kv6.4 voltage-sensing domain and has a voltage-dependency that matches the hyperpolarizing shift in Kv2.1/Kv6.4 channel inactivation. These results provide a mechanistic basis for the modulation of Kv2.1 channel inactivation gating kinetics by silent Kv6.4 subunits.

  9. PEP magnet power supply systems

    International Nuclear Information System (INIS)

    Jackson, L.T.

    1977-01-01

    The dc electrical requirements of the PEP magnets fall mainly into two categories: (1) high power and current of single polarity and (2) low-power bi-polar. The first category will be thyristor-chopper controlled off common 600 V dc busses. The second group will utilize continuously controlled push-pull transistor actuators

  10. Increased power delivery from the DIII-D neutral beam injection system

    International Nuclear Information System (INIS)

    Colleraine, A.P.; Callis, R.W.; Hong, R.M.; Kellman, D.H.; Kim, J.; Langhorn, A.R.; Lee, R.; Phillips, J.C.; Wight, J.J.

    1989-12-01

    The neutral beam system installed on the DIII-D tokamak employs eight 80 kV Long Pulse Sources (LPS) mounted on four beamlines and was originally designed to deliver a nominal 12 MW of H degree power to a plasma for pulses of up to 5 sec duration. Lawrence Berkeley Laboratory designed the LPS for the US Fusion Program to fill the requirements of both the DIII-D and the TFTR machines. Essentially all source components are of a common design; the DIII-D version is therefore conservative in its rated parameters. Recently a neutron shield has been constructed around the torus hall allowing D degree injection to become routine. Because deuterium beams have a better neutralization efficiency, the nominal power delivery per source has been measured to be approximately 2 MW (for a total of 16 MW) without any modifications. However, by reoptimizing the voltage gradients in the source, the perveance can be increased without degrading the optics. A change of gradient grid voltage from 0.83 V accel to 0.79 V accel raises the perveance from 2.5 to 3.0 μPerv with a corresponding gain in beam power of about 20%. The arc power required also must be increased to the range of 100 to 120 kW but this is well within the design limits of the LPS. Further studies of our systems are now underway to assess the possibilities of raising V accel above 80 kV. An additional gain in power is possible by this technique. 6 refs., 6 figs

  11. Intelligent power system data management systems (DBMS)

    Energy Technology Data Exchange (ETDEWEB)

    Middleton, A.; Macdonald, E. [GE Digital Energy, Markham, ON (Canada); Schreiner, Z. [Intelligent Process Solutions GmbH, Lindau (Germany); Bizjak, J. [Elektro Ljubljana d.d., Ljubljana (Slovenia)

    2010-07-01

    Network owners/operators from around the world have moved from electromechanical products to intelligent electronic devices (IEDs). Most networks have a multi-generation technology mix because protection assets have a normal application lifespan of between 10 and 40 years. Associated data capture and maintenance management regimes have therefore moved from paper based into digitized media, creating a significant increase in the volume of acquired data, such that there is now a mix of paper and digitized storage. Data is rarely consolidated or used for decision making in asset management processes once testing is completed, having a major impact on overall power system reliability. This paper presented the concept of intelligent operative maintenance management, now becoming more recognized in the industry. The concept was described as the management of operational data, resulting actions and responses, wherever and by whoever they are needed, without any additional overhead. The paper discussed new techniques of testing as well as planning and operative maintenance. The practical benefits of the new system were also presented, with particular reference to central management; simplification of routine protocols; secondary testing; and reduced cost of data handling. It was concluded that the main benefit from all of the techniques discussed in this paper is that experienced expert test engineers can focus more time upon making good, critical decisions to ensure that utilities maximize their customer service and safety regimes. 13 refs., 7 figs.

  12. ADVANCED POWER SYSTEMS ANALYSIS TOOLS

    Energy Technology Data Exchange (ETDEWEB)

    Robert R. Jensen; Steven A. Benson; Jason D. Laumb

    2001-08-31

    The use of Energy and Environmental Research Center (EERC) modeling tools and improved analytical methods has provided key information in optimizing advanced power system design and operating conditions for efficiency, producing minimal air pollutant emissions and utilizing a wide range of fossil fuel properties. This project was divided into four tasks: the demonstration of the ash transformation model, upgrading spreadsheet tools, enhancements to analytical capabilities using the scanning electron microscopy (SEM), and improvements to the slag viscosity model. The ash transformation model, Atran, was used to predict the size and composition of ash particles, which has a major impact on the fate of the combustion system. To optimize Atran key factors such as mineral fragmentation and coalescence, the heterogeneous and homogeneous interaction of the organically associated elements must be considered as they are applied to the operating conditions. The resulting model's ash composition compares favorably to measured results. Enhancements to existing EERC spreadsheet application included upgrading interactive spreadsheets to calculate the thermodynamic properties for fuels, reactants, products, and steam with Newton Raphson algorithms to perform calculations on mass, energy, and elemental balances, isentropic expansion of steam, and gasifier equilibrium conditions. Derivative calculations can be performed to estimate fuel heating values, adiabatic flame temperatures, emission factors, comparative fuel costs, and per-unit carbon taxes from fuel analyses. Using state-of-the-art computer-controlled scanning electron microscopes and associated microanalysis systems, a method to determine viscosity using the incorporation of grey-scale binning acquired by the SEM image was developed. The image analysis capabilities of a backscattered electron image can be subdivided into various grey-scale ranges that can be analyzed separately. Since the grey scale's intensity

  13. Power system reliability analysis using fault trees

    International Nuclear Information System (INIS)

    Volkanovski, A.; Cepin, M.; Mavko, B.

    2006-01-01

    The power system reliability analysis method is developed from the aspect of reliable delivery of electrical energy to customers. The method is developed based on the fault tree analysis, which is widely applied in the Probabilistic Safety Assessment (PSA). The method is adapted for the power system reliability analysis. The method is developed in a way that only the basic reliability parameters of the analysed power system are necessary as an input for the calculation of reliability indices of the system. The modeling and analysis was performed on an example power system consisting of eight substations. The results include the level of reliability of current power system configuration, the combinations of component failures resulting in a failed power delivery to loads, and the importance factors for components and subsystems. (author)

  14. Scheduling of Power System Cells Integrating Stochastic Power Generation

    International Nuclear Information System (INIS)

    Costa, L.M.

    2008-12-01

    Energy supply and climate change are nowadays two of the most outstanding problems which societies have to cope with under a context of increasing energy needs. Public awareness of these problems is driving political willingness to take actions for tackling them in a swift and efficient manner. Such actions mainly focus in increasing energy efficiency, in decreasing dependence on fossil fuels, and in reducing greenhouse gas emissions. In this context, power systems are undergoing important changes in the way they are planned and managed. On the one hand, vertically integrated structures are being replaced by market structures in which power systems are un-bundled. On the other, power systems that once relied on large power generation facilities are witnessing the end of these facilities' life-cycle and, consequently, their decommissioning. The role of distributed energy resources such as wind and solar power generators is becoming increasingly important in this context. However, the large-scale integration of such type of generation presents many challenges due, for instance, to the uncertainty associated to the variability of their production. Nevertheless, advanced forecasting tools may be combined with more controllable elements such as energy storage devices, gas turbines, and controllable loads to form systems that aim to reduce the impacts that may be caused by these uncertainties. This thesis addresses the management under market conditions of these types of systems that act like independent societies and which are herewith named power system cells. From the available literature, a unified view of power system scheduling problems is also proposed as a first step for managing sets of power system cells in a multi-cell management framework. Then, methodologies for performing the optimal day-ahead scheduling of single power system cells are proposed, discussed and evaluated under both a deterministic and a stochastic framework that directly integrates the

  15. Faults and Diagnosis Systems in Power Converters

    DEFF Research Database (Denmark)

    Lee, Kyo-Beum; Choi, Uimin

    2014-01-01

    A power converter is needed in almost all kinds of renewable energy systems and drive systems. It is used both for controlling the renewable source and for interfacing with the load, which can be grid-connected or working in standalone mode. Further, it drives the motors efficiently. Increasing...... efforts have been put into making these systems better in terms of reliability in order to achieve high power source availability, reduce the cost of energy and also increase the reliability of overall systems. Among the components used in power converters, a power device and a capacitor fault occurs most...... frequently. Therefore, it is important to monitor the power device and capacitor fault to increase the reliability of power electronics. In this chapter, the diagnosis methods for power device fault will be discussed by dividing into open- and short-circuit faults. Then, the condition monitoring methods...

  16. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  17. Detailed design of a 13 kA 13 kV dc solid-state turn-off switch

    International Nuclear Information System (INIS)

    Praeg, W.F.

    1985-01-01

    An experimental facility for the study of electromagnetic effects in the First Wall-Blanket-shield (FWBS) systems of fusion reactors has been constructed at Argonne National Laboratory (ANL). In a test volume of 0.76 m 3 , a vertical, pulsed 5 kG dipole field (B -1 ) is perpendicular to a 10 kG solenoid field. Power supplies of 2.75 MW at 550 V dc and 5.5 MW at 550 V dc and a solid-state switch rated at 13 kA and 13 kV (169 MW) control the pulsed magnetic fields. The total stored energy in the coils is 2.6 MJ. This paper describes the design and construction features of the solid-state switching circuit which turns off a dc of 13 kA in approximately 82 μs and holds off voltages of < 13 kV

  18. 2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

    2014-11-01

    A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

  19. Flexibility in 21st Century Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, J.; Miller, M.; Zinaman, O.; Milligan, M.; Arent, D.; Palmintier, B.; O' Malley, M.; Mueller, S.; Lannoye, E.; Tuohy, A.; Kujala, B.; Sommer, M.; Holttinen, H.; Kiviluoma, J.; Soonee, S. K.

    2014-05-01

    Flexibility of operation--the ability of a power system to respond to change in demand and supply--is a characteristic of all power systems. Flexibility is especially prized in twenty-first century power systems, with higher levels of grid-connected variable renewable energy (primarily, wind and solar). This paper summarizes the analytic frameworks that have emerged to measure this characteristic and distills key principles of flexibility for policy makers.

  20. Handbook of co₂ in power systems

    CERN Document Server

    Rebennack, Steffen; Pardalos, Panos; Pereira, Mario; Iliadis, Niko

    2012-01-01

    The Handbook of CO₂in Power Systems' objective is to include the state-of-the-art developments that occurred in power systems taking CO₂emission into account. The book includes power systems operation modeling with CO₂emissions considerations, CO₂market mechanism modeling, CO₂regulation policy modeling, carbon price forecasting, and carbon capture modeling. For each of the subjects, at least one article authored by a world specialist on the specific domain is included.

  1. DC power supplies power management and surge protection for power electronic systems

    CERN Document Server

    Kularatna, Nihal

    2011-01-01

    Modern electronic systems, particularly portable consumer electronic systems and processor based systems, are power hungry, compact, and feature packed. This book presents the most essential summaries of the theory behind DC-DC converter topologies of both linear and switching types. The text discusses power supply characteristics and design specifications based on new developments in power management techniques and modern semiconductors entering into the portable electronics market. The author also addresses off-the-line power supplies, digital control of power supply, power supply protection

  2. Investigation on the Short-Circuit Behavior of an Aged IGBT Module Through a 6 kA/1.1 kV Non-Destructive Testing Equipment

    DEFF Research Database (Denmark)

    Wu, Rui; Smirnova, Liudmila; Iannuzzo, Francesco

    2014-01-01

    This paper describes the design and development of a 6 kA/1.1 kV non-destructive testing system, which aims for short circuit testing of high-power IGBT modules. An ultralow stray inductance of 37 nH is achieved in the implementation of the tester. An 100 MHz FPGA supervising unit enables 10 ns...

  3. Artificial intelligence in power system optimization

    CERN Document Server

    Ongsakul, Weerakorn

    2013-01-01

    With the considerable increase of AI applications, AI is being increasingly used to solve optimization problems in engineering. In the past two decades, the applications of artificial intelligence in power systems have attracted much research. This book covers the current level of applications of artificial intelligence to the optimization problems in power systems. This book serves as a textbook for graduate students in electric power system management and is also be useful for those who are interested in using artificial intelligence in power system optimization.

  4. Power system protection 1 principles and components

    CERN Document Server

    Association, Electricity Training

    1995-01-01

    The worldwide growth in demand for electricity has forced the pace of developments in electrical power system design to meet consumer needs for reliable, secure and cheap supplies. Power system protection, as a technology essential to high quality supply, is widely recognised as a specialism of growing and often critical importance, in which power system needs and technological progress have combined to result in rapid developments in policy and practice in recent years. In the United Kingdom, the need for appropriate training in power system protection was recognised in the early 1960s with t

  5. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  6. Wind power systems. Applications of computational intelligence

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Lingfeng [Toledo Univ., OH (United States). Dept. of Electrical Engineering and Computer Science; Singh, Chanan [Texas A and M Univ., College Station, TX (United States). Electrical and Computer Engineering Dept.; Kusiak, Andrew (eds.) [Iowa Univ., Iowa City, IA (United States). Mechanical and Industrial Engineering Dept.

    2010-07-01

    Renewable energy sources such as wind power have attracted much attention because they are environmentally friendly, do not produce carbon dioxide and other emissions, and can enhance a nation's energy security. For example, recently more significant amounts of wind power are being integrated into conventional power grids. Therefore, it is necessary to address various important and challenging issues related to wind power systems, which are significantly different from the traditional generation systems. This book is a resource for engineers, practitioners, and decision-makers interested in studying or using the power of computational intelligence based algorithms in handling various important problems in wind power systems at the levels of power generation, transmission, and distribution. Researchers have been developing biologically-inspired algorithms in a wide variety of complex large-scale engineering domains. Distinguished from the traditional analytical methods, the new methods usually accomplish the task through their computationally efficient mechanisms. Computational intelligence methods such as evolutionary computation, neural networks, and fuzzy systems have attracted much attention in electric power systems. Meanwhile, modern electric power systems are becoming more and more complex in order to meet the growing electricity market. In particular, the grid complexity is continuously enhanced by the integration of intermittent wind power as well as the current restructuring efforts in electricity industry. Quite often, the traditional analytical methods become less efficient or even unable to handle this increased complexity. As a result, it is natural to apply computational intelligence as a powerful tool to deal with various important and pressing problems in the current wind power systems. This book presents the state-of-the-art development in the field of computational intelligence applied to wind power systems by reviewing the most up

  7. Safety requirements for a nuclear power plant electric power system

    Energy Technology Data Exchange (ETDEWEB)

    Fouad, L F; Shinaishin, M A

    1988-06-15

    This work aims at identifying the safety requirements for the electric power system in a typical nuclear power plant, in view of the UNSRC and the IAEA. Description of a typical system is provided, followed by a presentation of the scope of the information required for safety evaluation of the system design and performance. The acceptance and design criteria that must be met as being specified by both regulatory systems, are compared. Means of implementation of such criteria as being described in the USNRC regulatory guides and branch technical positions on one hand and in the IAEA safety guides on the other hand are investigated. It is concluded that the IAEA regulations address the problems that may be faced with in countries having varying grid sizes ranging from large stable to small potentially unstable ones; and that they put emphasis on the onsite standby power supply. Also, in this respect the Americans identify the grid as the preferred power supply to the plant auxiliaries, while the IAEA leaves the possibility that the preferred power supply could be either the grid or the unit main generator depending on the reliability of each. Therefore, it is found that it is particularly necessary in this area of electric power supplies to deal with the IAEA and the American sets of regulations as if each complements and not supplements the other. (author)

  8. RELIABILITY ANALYSIS OF POWER DISTRIBUTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    Popescu V.S.

    2012-04-01

    Full Text Available Power distribution systems are basic parts of power systems and reliability of these systems at present is a key issue for power engineering development and requires special attention. Operation of distribution systems is accompanied by a number of factors that produce random data a large number of unplanned interruptions. Research has shown that the predominant factors that have a significant influence on the reliability of distribution systems are: weather conditions (39.7%, defects in equipment(25% and unknown random factors (20.1%. In the article is studied the influence of random behavior and are presented estimations of reliability of predominantly rural electrical distribution systems.

  9. Power system SCADA and smart grids

    CERN Document Server

    Thomas, Mini S

    2015-01-01

    Power System SCADA and Smart Grids brings together in one concise volume the fundamentals and possible application functions of power system supervisory control and data acquisition (SCADA). The text begins by providing an overview of SCADA systems, evolution, and use in power systems and the data acquisition process. It then describes the components of SCADA systems, from the legacy remote terminal units (RTUs) to the latest intelligent electronic devices (IEDs), data concentrators, and master stations, as well as:Examines the building and practical implementation of different SCADA systemsOf

  10. Water reactive hydrogen fuel cell power system

    Science.gov (United States)

    Wallace, Andrew P; Melack, John M; Lefenfeld, Michael

    2014-01-21

    A water reactive hydrogen fueled power system includes devices and methods to combine reactant fuel materials and aqueous solutions to generate hydrogen. The generated hydrogen is converted in a fuel cell to provide electricity. The water reactive hydrogen fueled power system includes a fuel cell, a water feed tray, and a fuel cartridge to generate power for portable power electronics. The removable fuel cartridge is encompassed by the water feed tray and fuel cell. The water feed tray is refillable with water by a user. The water is then transferred from the water feed tray into a fuel cartridge to generate hydrogen for the fuel cell which then produces power for the user.

  11. Normalized noise power spectrum of full field digital mammography detector system

    International Nuclear Information System (INIS)

    Norriza Mohd Isa; Wan Muhamad Saridan Wan Hassan

    2009-01-01

    Full text: A method to measure noise power spectrum of a full field digital mammography system is presented. The effect of X-ray radiation dose, size and configuration of region of interest on normalized noise power spectrum (NNPS) was investigated. Flat field images were acquired using RQA-M2 beam quality technique (Mo/Mo anode-filter, 28 kV, 2 mm Al) with different clinical radiation doses. The images were cropped at about 4 cm from the edge of the breast wall and then divided into different size of non-overlapping or overlapping segments. NNPS was determined through de trending, 2-D fast Fourier transformation and normalization. Our measurement shows that high radiation dose gave lower NNPS at a specific beam quality. (author)

  12. Atlas Pulsed Power System: a Driver for Multi-Megagauss Fields

    International Nuclear Information System (INIS)

    Cochrane, J.C.; Bartsch, R.R.; Bennett, G.A.; Bowman, D.W.; Davis, H.A.; Ekdahl, C.A.; Gribble, R.F.; Kimerly, H.J.; Nielsen, K.E.; Parsons, W.M.; Paul, J.D.; Scudder, D.W.; Trainor, R.J.; Thompson, M.C.; Watt, R.G.

    1998-01-01

    Atlas is a pulsed power machine designed for hydrodynamic experiments for the Los Alamos High Energy Density Physics Experimental program. It is presently under construction and should be operational in late 2000. Atlas will store 23 MJ at an erected voltage of 240 kV. This will produce a current of 30 MA into a static load and as much as 32 MA into a dynamic load. The current pulse will have a rise time of approximately5micros and will produce a magnetic field driving the impactor liner of several hundred Tesla at the target radius of one to two centimeters. The collision can produce shock pressures of approximately15 megabars. Design of the pulsed power system will be presented along with data obtained from the Atlas prototype Marx module

  13. Kv1 channels and neural processing in vestibular calyx afferents

    Directory of Open Access Journals (Sweden)

    Frances L Meredith

    2015-06-01

    Full Text Available Potassium-selective ion channels are important for accurate transmission of signals from auditory and vestibular sensory end organs to their targets in the central nervous system. During different gravity conditions, astronauts experience altered input signals from the peripheral vestibular system resulting in sensorimotor dysfunction. Adaptation to altered sensory input occurs, but it is not explicitly known whether this involves synaptic modifications within the vestibular epithelia. Future investigations of such potential plasticity require a better understanding of the electrophysiological mechanisms underlying the known heterogeneity of afferent discharge under normal conditions. This study advances this understanding by examining the role of the Kv1 potassium channel family in mediating action potentials in specialized vestibular afferent calyx endings in the gerbil crista and utricle. Pharmacological agents selective for different sub-types of Kv1 channels were tested on membrane responses in whole cell recordings in the crista. Kv1 channels sensitive to α-dendrotoxin and dendrotoxin-K were found to prevail in the central regions, whereas K+ channels sensitive to margatoxin, which blocks Kv1.3 and 1.6 channels, were more prominent in peripheral regions. Margatoxin-sensitive currents showed voltage-dependent inactivation. Dendrotoxin-sensitive currents showed no inactivation and dampened excitability in calyces in central neuroepithelial regions. The differential distribution of Kv1 potassium channels in vestibular afferents supports their importance in accurately relaying gravitational and head movement signals through specialized lines to the central nervous system. Pharmacological modulation of specific groups of K+ channels could help alleviate vestibular dysfunction on earth and in space.

  14. Kv1 channels and neural processing in vestibular calyx afferents.

    Science.gov (United States)

    Meredith, Frances L; Kirk, Matthew E; Rennie, Katherine J

    2015-01-01

    Potassium-selective ion channels are important for accurate transmission of signals from auditory and vestibular sensory end organs to their targets in the central nervous system. During different gravity conditions, astronauts experience altered input signals from the peripheral vestibular system resulting in sensorimotor dysfunction. Adaptation to altered sensory input occurs, but it is not explicitly known whether this involves synaptic modifications within the vestibular epithelia. Future investigations of such potential plasticity require a better understanding of the electrophysiological mechanisms underlying the known heterogeneity of afferent discharge under normal conditions. This study advances this understanding by examining the role of the Kv1 potassium channel family in mediating action potentials in specialized vestibular afferent calyx endings in the gerbil crista and utricle. Pharmacological agents selective for different sub-types of Kv1 channels were tested on membrane responses in whole cell recordings in the crista. Kv1 channels sensitive to α-dendrotoxin and dendrotoxin-K were found to prevail in the central regions, whereas K(+) channels sensitive to margatoxin, which blocks Kv1.3 and 1.6 channels, were more prominent in peripheral regions. Margatoxin-sensitive currents showed voltage-dependent inactivation. Dendrotoxin-sensitive currents showed no inactivation and dampened excitability in calyces in central neuroepithelial regions. The differential distribution of Kv1 potassium channels in vestibular afferents supports their importance in accurately relaying gravitational and head movement signals through specialized lines to the central nervous system. Pharmacological modulation of specific groups of K(+) channels could help alleviate vestibular dysfunction on earth and in space.

  15. MO-FG-CAMPUS-JeP3-03: Detection of Unpredictable Patient Movement During SBRT Using a Single KV Projection of An On-Board CBCT System: Simulation Study

    Energy Technology Data Exchange (ETDEWEB)

    Park, Y; Sharp, G; Winey, B [Massachusetts General Hospital and Harvard Medical School, Boston, MA (United States)

    2016-06-15

    Purpose: An unpredictable movement of a patient can occur during SBRT even when immobilization devices are applied. In the SBRT treatments using a conventional linear accelerator detection of such movements relies heavily on human interaction and monitoring. This study aims to detect such positional abnormalities in real-time by assessing intra-fractional gantry mounted kV projection images of a patient’s spine. Methods: We propose a self-CBCT image based spine tracking method consisting of the following steps: (1)Acquire a pre-treatment CBCT image; (2)Transform the CBCT volume according to the couch correction; (3)Acquire kV projections during treatment beam delivery; (4)Simultaneously with each acquisition generate a DRR from the CBCT volume based-on the current projection geometry; (5)Perform an intensity gradient-based 2D registration between spine ROI images of the projection and the DRR images; (6)Report an alarm if the detected 2D displacement is beyond a threshold value. To demonstrate the feasibility, retrospective simulations were performed on 1,896 projections from nine CBCT sessions of three patients who received lung SBRT. The unpredictable movements were simulated by applying random rotations and translations to the reference CBCT prior to each DRR generation. As the ground truth, the 3D translations and/or rotations causing >3 mm displacement of the midpoint of the thoracic spine were regarded as abnormal. In the measurements, different threshold values of 2D displacement were tested to investigate sensitivity and specificity of the proposed method. Results: A linear relationship between the ground truth 3D displacement and the detected 2D displacement was observed (R{sup 2} = 0.44). When the 2D displacement threshold was set to 3.6 mm the overall sensitivity and specificity were 77.7±5.7% and 77.9±3.5% respectively. Conclusion: In this simulation study, it was demonstrated that intrafractional kV projections from an on-board CBCT system have a

  16. MO-FG-CAMPUS-JeP3-03: Detection of Unpredictable Patient Movement During SBRT Using a Single KV Projection of An On-Board CBCT System: Simulation Study

    International Nuclear Information System (INIS)

    Park, Y; Sharp, G; Winey, B

    2016-01-01

    Purpose: An unpredictable movement of a patient can occur during SBRT even when immobilization devices are applied. In the SBRT treatments using a conventional linear accelerator detection of such movements relies heavily on human interaction and monitoring. This study aims to detect such positional abnormalities in real-time by assessing intra-fractional gantry mounted kV projection images of a patient’s spine. Methods: We propose a self-CBCT image based spine tracking method consisting of the following steps: (1)Acquire a pre-treatment CBCT image; (2)Transform the CBCT volume according to the couch correction; (3)Acquire kV projections during treatment beam delivery; (4)Simultaneously with each acquisition generate a DRR from the CBCT volume based-on the current projection geometry; (5)Perform an intensity gradient-based 2D registration between spine ROI images of the projection and the DRR images; (6)Report an alarm if the detected 2D displacement is beyond a threshold value. To demonstrate the feasibility, retrospective simulations were performed on 1,896 projections from nine CBCT sessions of three patients who received lung SBRT. The unpredictable movements were simulated by applying random rotations and translations to the reference CBCT prior to each DRR generation. As the ground truth, the 3D translations and/or rotations causing >3 mm displacement of the midpoint of the thoracic spine were regarded as abnormal. In the measurements, different threshold values of 2D displacement were tested to investigate sensitivity and specificity of the proposed method. Results: A linear relationship between the ground truth 3D displacement and the detected 2D displacement was observed (R 2 = 0.44). When the 2D displacement threshold was set to 3.6 mm the overall sensitivity and specificity were 77.7±5.7% and 77.9±3.5% respectively. Conclusion: In this simulation study, it was demonstrated that intrafractional kV projections from an on-board CBCT system have a

  17. Design for Reliability of Power Electronic Systems

    DEFF Research Database (Denmark)

    Wang, Huai; Ma, Ke; Blaabjerg, Frede

    2012-01-01

    Advances in power electronics enable efficient and flexible processing of electric power in the application of renewable energy sources, electric vehicles, adjustable-speed drives, etc. More and more efforts are devoted to better power electronic systems in terms of reliability to ensure high......). A collection of methodologies based on Physics-of-Failure (PoF) approach and mission profile analysis are presented in this paper to perform reliability-oriented design of power electronic systems. The corresponding design procedures and reliability prediction models are provided. Further on, a case study...... on a 2.3 MW wind power converter is discussed with emphasis on the reliability critical components IGBTs. Different aspects of improving the reliability of the power converter are mapped. Finally, the challenges and opportunities to achieve more reliable power electronic systems are addressed....

  18. Energy storage in future power systems

    DEFF Research Database (Denmark)

    Rasmussen, Claus Nygaard; Østergaard, Jacob; Divya, K. C.

    2011-01-01

    Most sources of renewable power are characterised by uncontrollable and chaotic variations in power output. We here look at how energy storage may benefit renewable power generation by making it available in periods with little or no intermittent generation and thereby prevent additional conventi......Most sources of renewable power are characterised by uncontrollable and chaotic variations in power output. We here look at how energy storage may benefit renewable power generation by making it available in periods with little or no intermittent generation and thereby prevent additional...... conventional generation form being used. In addition to this, one of the strongest concerns in relation to renewable power is the instability in the electric power system that it may introduce as a result of large and relatively fast power fluctuations. An additional benefit of energy storage is therefore its...

  19. High reliability low jitter 80 kV pulse generator

    International Nuclear Information System (INIS)

    Savage, Mark Edward; Stoltzfus, Brian Scott

    2009-01-01

    Switching can be considered to be the essence of pulsed power. Time accurate switch/trigger systems with low inductance are useful in many applications. This article describes a unique switch geometry coupled with a low-inductance capacitive energy store. The system provides a fast-rising high voltage pulse into a low impedance load. It can be challenging to generate high voltage (more than 50 kilovolts) into impedances less than 10 (Omega), from a low voltage control signal with a fast rise time and high temporal accuracy. The required power amplification is large, and is usually accomplished with multiple stages. The multiple stages can adversely affect the temporal accuracy and the reliability of the system. In the present application, a highly reliable and low jitter trigger generator was required for the Z pulsed-power facility [M. E. Savage, L. F. Bennett, D. E. Bliss, W. T. Clark, R. S. Coats,J. M. Elizondo, K. R. LeChien, H. C. Harjes, J. M. Lehr, J. E. Maenchen, D. H. McDaniel, M. F. Pasik, T. D. Pointon, A. C. Owen, D. B. Seidel, D. L. Smith, B. S. Stoltzfus, K.W. Struve, W.A. Stygar, L.K. Warne, and J. R. Woodworth, 2007 IEEE Pulsed Power Conference, Albuquerque, NM (IEEE, Piscataway, NJ, 2007), p. 979]. The large investment in each Z experiment demands low prefire probability and low jitter simultaneously. The system described here is based on a 100 kV DC-charged high-pressure spark gap, triggered with an ultraviolet laser. The system uses a single optical path for simultaneously triggering two parallel switches, allowing lower inductance and electrode erosion with a simple optical system. Performance of the system includes 6 ns output rise time into 5.6 (Omega), 550 ps one-sigma jitter measured from the 5 V trigger to the high voltage output, and misfire probability less than 10 -4 . The design of the system and some key measurements will be shown in the paper. We will discuss the design goals related to high reliability and low jitter. While

  20. Gate driver with high common mode rejection and self turn-on mitigation for a 10 kV SiC MOSFET enabled MV converter

    DEFF Research Database (Denmark)

    Dalal, Dipen Narendrabhai; Christensen, Nicklas; Jørgensen, Asger Bjørn

    2017-01-01

    Miller clamp circuit for a 10 kV half bridge SiC MOSFET power module. Designed power supply and the gate driver circuit are verified in a double pulse test setup and a continuous switching operation using the 10 kV half bridge silicon carbide MOSFET power module. An in-depth experimental verification...