WorldWideScience

Sample records for krsko npp analyzer

  1. Seismic characterization of the NPP Krsko site

    International Nuclear Information System (INIS)

    Obreza, J.

    2000-01-01

    The goal of NPP Krsko PSA Project Update was the inclusion of plant changes (i.e. configuration/operational related) through the period January 1, 1993 till the OUTAGE99 (April 1999) into the integrated Internal/External Level 1/Level 2 NPP Krsko PSA RISK SPECTRUM model. NPP Krsko is located on seismotectonic plate. Highest earthquake was recorded in 1917 with magnitude 5.8 at a distance of 7-9 km. Site (founded) on Pliocene sediments which are as deep as several hundred meters. No surface faulting at the Krsko site has been observed and thus it is not to be expected. NPP Krsko is equipped with seismic instrumentation, which allows it to complete OBE (SSE). The seismic PSA successfully showed high seismic margin at Krsko plant. NPP Krsko seismic design is based on US regulations and standards

  2. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  3. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  4. Environmental impact of the NPP Krsko

    International Nuclear Information System (INIS)

    Novosel, N.

    1996-01-01

    The Ministry of Economic Affairs has for six years now been monitoring the operation of the Krsko NPP (NEK) and its impact on the environment. A bulletin titled 'NEK - Energy and Environment' is being issued every three months. It contains information on operation of the Krsko NPP for the previous three months, a graph of duration of temperature increase of water in the Sava river (delta T) in that period, an assessment of the radiological impact of Krsko NPP on the environment through an equivalent dose cumulatively throughout the calendar year, and a short current text related to Krsko NPP. The Ministry of Economic Affairs organizes a press conference on every issue of the bulletin, as an attempt of introducing this subject to the media and to the public. This paper contains a review of information given in the NEK bulletin from 1990 to 1995 with a special emphasis on the contribution of the Krsko NPP to the artificially caused radiation on the border between the Republic of croatia and the Republic of Slovenia. (author)

  5. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  6. NPP Krsko natural circulation performance evaluation

    International Nuclear Information System (INIS)

    Segon, Velimir; Bajs, Tomislav; Frogheri, Monica

    1999-01-01

    The present document deals with an evaluation of the natural circulation performance of the Krsko nuclear power plant. Two calculation have been performed using the NPP Krsko nodalization (both similar to the LOBI A2-77 natural circulation experiment) - the first with the present steam generators at NPP Krsko (Westinghouse, 18% plugged), the second with the future steam generators (Siemens, 0% plugged). The results were evaluated using the natural circulation flow map derived in /1/, and were compared to evaluate the influence of the new steam generators on the natural circulation performance. (author)

  7. Start-up of NPP Krsko; Pokusno obratovanje NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Spiler, J; Aralica, J [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1984-07-01

    The report describes a review of start-up program and its realisation. There are also described some more significant start-up results with their evaluation. The most significant operation criteria are compared between NPP Krsko and other similar plants in the world. The comparison shows that after the first contractors and operation personnel efforts have been accomplished, our first nuclear power plant is a safe and reliable source of electric power. At the end there are listed NPP Krsko start-up recommendations and experience. (author)

  8. Safety Culture Survey in Krsko NPP

    International Nuclear Information System (INIS)

    Strucic, M.; Bilic Zadric, T.

    2008-01-01

    results very reliable. Survey results were statistically analyzed and presented to Krsko NPP management board. More specific qualitative analyses were performed for departments. With assistance of Safety Culture Self Assessment team members, leaders of these departments developed specific action plans and disseminated major identified issues. By these feedbacks Krsko NPP ensured better employees understanding of the results of the survey. It is very exceptive that employee's responses will contribute to the overall process and establishment of safety conscious work environment.(author)

  9. Transition cycle fuel management problems of NPP Krsko

    International Nuclear Information System (INIS)

    Petrovic, B.; Pevec, D.; Smuc, T.; Urli, N.

    1989-01-01

    Transition cycle fuel management problems are described and illustrated using results and experience attained during core reload design of NPP Krsko. Improved version of computer code package PSU-LEOPARD/Mcrac is successfully applied to NPP Krsko loading pattern design. (author)

  10. NPP Krsko on-line low pressure containment tightness monitoring implementation

    International Nuclear Information System (INIS)

    Dudas, M.; Basic, I.

    2004-01-01

    Containment Integrated Leak Rate Test (CILRT) 1999 in NPP Krsko was completely performed following regulation of 10CFR50 Appendix J Option A and ANSI/ANS 56.8-1987 at a design pressure (3.15 kp/cm2). In 2001 NPP Krsko proposed to Slovenian Nuclear Safety Administration (SNSA) the Technical Specification (TS) and Updated Safety Analysis Report (USAR) changes that describe implementation of new test intervals for Type A, B and C tests according to 10CFR50, Appendix J, Option B. After the positive final independent review of proposed changes by Authorized Institution, NPP Krsko received the License Amendment requiring from NPP Krsko to define technical solution for surveillance of containment tightness between two 10-years CILRT. This paper intends to discuss proposed methods by NPP Krsko, test equipment, performed measurements in 2004, associated analyses and evaluation.(author)

  11. Transition cycle fuel management problems of NPP Krsko; Problemi gospodarenje gorivom u prijelaznim ciklusima NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, B [Institut ' Rudjer Boskovic' , Zagreb (Yugoslavia); Pevec, D [Elektrotehnicki fakultet, Zagreb (Yugoslavia); Smuc, T; Urli, N [Institut ' Rudjer Boskovic' , Zagreb (Yugoslavia)

    1989-07-01

    Transition cycle fuel management problems are described and illustrated using results and experience attained during core reload design of NPP Krsko. Improved version of computer code package PSU-LEOPARD/Mcrac is successfully applied to NPP Krsko loading pattern design. (author)

  12. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  13. Quality of Industry Support to NPP Krsko

    International Nuclear Information System (INIS)

    Nemcic, K.

    2008-01-01

    NPP Krsko developed program for Supplier evaluation and performance. During the regular control of suppliers and evaluation of industry support to NPP Krsko quality problems were reported. Different quality systems were evaluated and different suppliers as: design organizations, equipment manufacturers, material vendors were audited or surveillance was performed. This paper discuss and report various cases where quality issues were problems based on audit results and present actions and efforts undertaken by the NE Krsko Quality Assurance Department to improve performance of the contractors, vendors, suppliers. New and different quality standards as approach in numerous articles are described as improvement or quality changes but also 'different opinion exist'. This paper also presents the author view and approach how to solve the possible future problems with different quality systems and organisations used by industry who support daily operation of NE Krsko and give recommendations for future nuclear projects.(author)

  14. NPP Krsko Containment Response Following Main Steam Line Break

    International Nuclear Information System (INIS)

    Spalj, S.; Grgic, D.; Cavlina, N.

    2000-01-01

    This paper presents the calculation of thermohydraulic environmental parameters (pressure and temperature) inside containment of Krsko NPP after postulated Main Steam Line Break (MSLB) accident. This analysis was done as a part of the ambient parameters specification in the frame of the NPP Krsko Equipment Qualification (EQ) project. The RELAP5/mod2 computer code was used for the determination of MSLB mass and energy release and computer code GOTHIC was used to calculate pressure and temperature profiles inside NPP Krsko containment. The analysis was performed for spectrum of break sizes to account for possible steam superheating during accidents with smaller break sizes. (author)

  15. Perspectives of Living PSA in NPP Krsko

    International Nuclear Information System (INIS)

    Vrbanic, I.; Kastelan, M.

    1996-01-01

    Nuclear power plant Krsko has completed the Level 1/Level 2 Probabilistic Safety Analysis (PSA) for internal initiating events and is in the process of completing the same for the external initiators. The analysis completed up to now has provided a valuable insight into a plant risk profile. In NPP Krsko there is a plan to use the PSA model as a permanent tool for the risk based applications and incorporate it into a decision making process. In order to achieve this there is a need to permanently maintain the PSA model in a manner that it reflects both the plan configuration/design at a time point and the operational experience up to the time point. All the activities aimed toward keeping the PSA model up-to-dated in this sense are usually referred to as a Living PSA (LPSA) program. NPP Krsko is in the process of defining and proceduralizing a LPSA program that would be plant specific and based on known world practices. Further, in order to be suitable for risk based applications the PSA model must be flexible in a sense that modifications to the base case model may be done easily and requantifications performed quickly as to evaluate various conditions imposed by real or hypothetical situations. NPP Krsko PSA model has been based on licensing type software. The requirements specified above dictate the transfer of the overall model to an application oriented software of newer generation with larger capabilities. The transfer becomes a part of a mentioned ongoing effort aimed at establishing LPSA model and concept. The paper present this effort and the perspectives of LPSA concept and risk based applications in NPP Krsko. (author)

  16. NPP Krsko small break LOCA analysis

    International Nuclear Information System (INIS)

    Mavko, B.; Petelin, S.; Peterlin, G.

    1987-01-01

    Parametric analysis of small break loss of coolant accident for the Krsko NPP was calculated by using RELAP5/MOD1 computer code. The model that was used in our calculations has been improved over several years and was previously tested in simulation (s) of start-up tests and known NPP Krsko transients. In our calculations we modelled automatic actions initiated by control, safety and protection systems. We also modelled the required operator actions as specified in emergency operating instructions. In small-break LOCA calculations, we varied break sizes in the cold leg. The influence of steam generator tube plugging on small break LOCA accidents was also analysed. (author)

  17. NPP Krsko Living PSA Concept

    International Nuclear Information System (INIS)

    Vrbanic, I.; Spiler, J.

    2000-01-01

    NPP Krsko developed PSA model of internal and external initiators within the frame of the Individual Plant Examination (IPE) project. Within this project PSA model was used to examine the existing plant design features. In order to continue with use of this PSA model upon the completion of IPE in various risk-informed applications in support of plant operation and evaluations of design changes, an appropriate living PSA concept needed to be defined. The Living PSA concept is in NPP Krsko considered as being a set of activities pursued in order to update existing PSA model in a manner that it appropriately represents the plant design, operation practice and history. Only a PSA model which is being updated in this manner can serve as a platform for plant-specific risk informed applications. The NPP Krsko living PSA concept is based on the following major ponts. First, the baseline PSA model is defined, which is to be maintained and updated and which is to be reference point for any risk-informed application. Second, issues having a potential for impact on baseline PSA model are identified and procedure and responsibilities for their permanent monitoring and evaluation are established. Third, manner is defined in which consequential changes to baseline PSA model are implemented and controlled, together with associated responsibilities. Finally, the process is defined by which the existing version of baseline PSA model is superseded by a new one. Each time a new version of baseline PSA model is released, it would be re-quantified and the results evaluated and interpreted. By documenting these re-quantifications and evaluations of results in a sequence, the track is being kept of changes in long-term averaged risk perspective, represented by long-term averaged frequencies of core damage and pre-defined release categories. These major topics of NPP Krsko living PSA concept are presented and discussed in the paper. (author)

  18. NPP Krsko full scope simulator verification and qualification

    International Nuclear Information System (INIS)

    Krajnc, B.; Glaser, B.; Novsak, M.; Spiler, J.

    1998-01-01

    NPP Krsko (NEK) will, as a part of the Modernization plan, obtain also Krsko Full Scope Simulator (KFSS). Contract has been awarded to CAE Electronics for the design, construction and integration. KFSS will support in real time, the training for the complete range of operation, which can be performed from the main control room and some selected plant areas (remote shutdown panels, etc). Based on the lessons learned on development of NPP Krsko Basic Principle Simulator we decided for active approach. That means that NPP Krsko personnel will be heavily involved into all phases of KFSS development and testing. Since NPP Krsko is going to replace the existing steam generators, raise the nominal power and perform necessary modifications to support the power uprate, it was decided that the development of the KFSS will be conducted in two steps: 1. Development of the models as well as all the hardware interface in the MCR for the existing plant Cycle 15 and then, 2. Models and hardware will be modified, added or replaced as needed to take into account the steam generator replacement and plant uprate projects. In spite of the fact that the simulator will be used for the training of the plant operators for the uprated conditions and with new steam generators, the upper described approach was selected since we want to be sure that the models will at the beginning adequately simulate the existing plant. For the existing conditions we have available reference data for different plant conditions, as well as data for different plant transients. By verifying that simulator will be able adequately simulate the existing conditions the level of confidence for the uprated simulator will be much higher. This is of special importance since it will support initial training for modernized plant conditions. In this paper the plan for verification and qualification of KFSS as well as the amount of the work needed on NPP Krsko side to develop the test acceptance criteria will be presented.(author)

  19. Revision 2 of the Program of NPP Krsko Decommissioning and SF and LILW Disposal

    International Nuclear Information System (INIS)

    Levanat, I.; Lokner, V.; Rapic, A.

    2010-01-01

    First joint Slovenian-Croatian Program of NPP Krsko Decommissioning and SF and LILW Disposal (DP) was completed in 2004 and formally adopted in 2005. As bilateral agreement on the NPP requires periodic revisions at least each 5 years, revision 2 of DP was started in September 2008, with the purpose to incorporate relevant developments since the 1st revision, to improve the level of details and reliability of DP, and to propose updated and more accurate cost estimates and appropriate financing models. In the first phase of the revision, new supporting studies for DP modules were prepared. Among these studies, the most demanding was the NPP Krsko specific Preliminary Decommissioning Plan (PDP), complying with the IAEA-recommended format, which included development of the NPP decommissioning inventory database. For upgrade of SF management, new and more detailed descriptions with improved cost estimates were prepared. Update of LILW disposal concept was based on new developments and projects prepared for the Slovenian repository. In the second phase of the revision, integrated DP scenarios were formulated and analyzed. They integrate NPP decommissioning together with RW and SF management/disposal into rationally inter-related sequences. Boundary conditions for this revision required: (a) that the reference scenario from the previous revision should be re-examined, with appropriate variations or new alternatives; (b) that the option of the NPP Krsko life extension should also be included; and (c) that the possibility of diverging interests of the contracting parties should also be analyzed (i.e. waste division and separate management). Finally, scenario evaluation is intended to compare the analyzed scenarios taking into account both their feasibility and estimated costs. It should provide the basis for determining future financing of DP, namely the annuities to be paid by the NPP Krsko owners into the national decommissioning funds.(author).

  20. Supercompaction of radioactive waste at NPP Krsko

    International Nuclear Information System (INIS)

    Fink, K.; Sirola, P.

    1996-01-01

    The problem of radioactive waste management is both scientifically and technically complex and also deeply emotional issue. In the last twenty years the first two aspects have been mostly resolved up to the point of safe implementation. In the Republic of Slovenia, certain fundamentalist approaches in politics and the use of radioactive waste problem as a political tool, brought the final radioactive repository siting effort to a stop. Although small amounts of radioactive waste are produced in research institutes, hospitals and industry, major source of radioactive waste in Slovenia is the Nuclear Power Plant Krsko. When Krsko NPP was originally built, plans were made to construct a permanent radioactive waste disposal facility. This facility was supposed to be available to receive waste from the plant long before the on site storage facility was full. However, the permanent disposal facility is not yet available, and it became necessary to retain the wastes produced at the plant in the on-site storage facility for an extended period of time. Temporary radioactive storage capacity at the plant site has limited capacity and having no other options available NPP Krsko is undertaking major efforts to reduce waste volume generated to allow normal operation. This article describes the Radioactive Waste Compaction Campaign performed from November, 1994 through November, 1995 at Krsko NPP, to enhance the efficiency and safety of storage of radioactive waste. The campaign involved the retrieval, segmented gamma-spectrum measurement, dose rate measurement, compaction, re-packaging, and systematic storage of radioactive wastes which had been stored in the NPP radioactive waste storage building since plant commissioning. (author)

  1. Disposal of spent nuclear fuel from NPP Krsko

    International Nuclear Information System (INIS)

    Mele, I.

    2004-01-01

    In order to get a clear view of the future liabilities of Slovenia and Croatia regarding the long term management of radioactive waste and spent nuclear fuel produced by the NPP Krsko, an estimation of disposal cost for low and intermediate level waste (LILW) as well as for spent nuclear fuel is needed. This cost estimation represents the basis for defining the target value for the financial resources to be accrued by the two national decommissioning and waste disposal funds, as determined in the agreement between Slovenia and Croatia on the ownership and exploitation of the NPP Krsko from March 2003, and for specifying their financial strategies. The one and only record of the NPP Krsko spent fuel disposal costs was made in the NPP Krsko Decommissioning Plan from 1996 [1]. As a result of incomplete input data, the above SF disposal cost estimate does not incorporate all cost elements. A new cost estimation was required in the process of preparation of the Joint Decommissioning and Waste Management Programme according to the provisions of the above mentioned agreement between Slovenia and Croatia. The basic presumptions and reference scenario for the disposal of spent nuclear fuel on which the cost estimation is based, as well as the applied methodology and results of cost estimation, are presented in this paper. Alternatives to the reference scenario and open questions which need to be resolved before the relevant final decision is taken, are also briefly discussed. (author)

  2. Nuclear Oversight Function at Krsko NPP

    International Nuclear Information System (INIS)

    Bozin, B.; Kavsek, D.

    2010-01-01

    The nuclear oversight function is used at the Krsko NPP constructively to strengthen safety and improve performance. Nuclear safety is kept under constant examination through a variety of monitoring techniques and activities, some of which provide an independent review. The nuclear oversight function at the Krsko NPP is accomplished by Quality and Nuclear Oversight Division (SKV). SKV has completed its mission through a combination of compliance, performance and effectiveness-based assessments. The performance-based assessment is an assessment using various techniques (observations, interviews, walk-downs, document reviews) to assure compliance with standards and regulations, obtain insight into performance, performance trends and also to identify opportunities to improve effectiveness of implementation. Generally, the performance-based approach to oversight function is based on some essential elements. The most important one which is developed and implemented is an oversight program (procedure). The program focuses on techniques, activities and objectives commensurate with their significance to plant operational safety. These techniques and activities are: self-assessments, assessments, audits, performance indicators, monitoring of corrective action program (CAP), industry independent reviews (such as IAEA's OSART and WANO Peer Review), industry benchmarking etc. Graded approach is an inherent product of a performance based program and ranking process. It is important not only to focus on the highest ranked performance based attributes but to lead to effective utilization of an oversight program. The attributes selected for oversight need to be based on plant specific experience, current industry operating experience, supplier's performance and quality issues. Collaboration within the industry and effective utility oversight of processes and design activities are essential for achieving good plant performance. So the oversight program must integrate relevant

  3. Regulatory review of NPP Krsko Periodic Safety Review

    International Nuclear Information System (INIS)

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  4. NPP Krsko Lifetime Extension - Business Impact for Hrvatska Elektroprivreda

    International Nuclear Information System (INIS)

    Vrankic, K.; Krejci, M.; Lebegner, J.

    2006-01-01

    This paper deals with the analysis of possible business impacts for HEP in the case of NPP Krsko life extension. Due to numerous reasons nuclear power plant life extension of ten to twenty years is a common procedure abroad. Having this practise in mind as well as other circumstances in Croatian and Slovenian electric power system, the extension of NPP Krsko lifetime is considered to be a possible scenario. Foreseeable impacts of this decision are evaluated primarily with consideration of its effect on HEPs projected cash flows, though other aspects will be addressed as well. Preserving a well maintained production facility with an extraordinary operational record and stable, or possibly falling overall production costs seems as a very rational choice. This is particularly true having in mind expected rise of electricity demand and energy prices in the region. Having NPP Krsko in operation beyond 2023 implies that no replacement source for NPP Krsko capacity needs to be built. This means avoiding all costs connected with the construction and operation of the replacement plant, assuming it will be fossil fuelled. Due to the high uncertainty of the future fossil fuel prices, the avoidance of replacement plant operational cost is likely to prove as highly rewarding. It should be kept in mind that avoided costs also include the replacement plant greenhouse gases emission costs, thus further enlarging the list of value adding impacts. The latter is valid anticipating the ratification of the Kyoto protocol and joining the European emission trading scheme. In addition to that, the extension of NPP Krsko lifetime would mean that the majority of costs connected with the decommissioning and final waste disposal can be postponed further down the time line. This will have very positive financial and possibly technological impact. Other value creating effects for HEP that are foreseeable as a consequence of the plant lifetime extension include: maintaining the knowledge of

  5. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    Experience has shown that number of minor events and near misses, usually without immediate or significant impact to plant safety and reliability, are precursors of significant or severe events due to the same or similar root or apparent cause(s). It is therefore desirable to identify and analyze weaknesses of the precursor problems (events) in order to prevent occurrence of significant events. Theoretically, significant events could be prevented from occurring if the root cause(s) of these precursor problems could be identified and eliminated. The Operating Experience Program identifies such event precursors and by reporting them to the industry, plant specific corrective actions can be taken to prevent events at other operational plants. The intent of the Operating Experience Program is therefore to improve nuclear power plant safety and reliability of the operating nuclear power plants. Each plant develops its own Operating Experience Program in order to learn from the in-house operating experience as well as from the world community of nuclear plants. The effective use of operating experience includes analyzing both plant and industry events in order to identify fundamental weaknesses and then determining appropriate plant-specific actions that will minimize the likelihood of similar events. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed it own Operating Experience Program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The Operating Experience Program is a part of the Corrective Action Program, which is among top management programs, thus program is strongly encouraged by top management. The purpose of Operating Experience Program is to provide guidance for using, sharing, and evaluating operating experience information

  6. Determination of the NPP Krsko reactor core safety limits using the COBRA-III-C code

    International Nuclear Information System (INIS)

    Lajtman, S.; Feretic, D.; Debrecin, N.

    1989-01-01

    This paper presents the NPP Krsko reactor core safety limits determined by the COBRA-III-C code, along with the methodology used. The reactor core safety limits determination is a part of reactor protection limits procedure. The results obtained were compared to safety limits presented in NPP Krsko FSAR. The COBRA-III-C NPP Krsko design core steady state thermal hydraulics calculation, used as the basis for the safety limits calculation, is presented as well. (author)

  7. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  8. Tritium liquid effluents from the Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Krizman, M.; Nemec, T.; Cindro, M.; Stritar, A.; Vokal Nemec, B.; Janzekovic, H.

    2007-01-01

    In the past, 12-months' fuel cycles in the Krsko NPP had not caused any problems regarding compliance with its Technical Specifications and license limits on liquid tritium releases (20 TBq/year, 8 TBq/three months). The first 18-months' fuel cycle, which was introduced in 2004, required fuel with higher enrichment, higher boron concentration in the primary coolant and more fuel rods with burnable poisons. In 2005, the NPP operated without refueling outage for the whole year and produced the highest amount of energy so far. Due to these facts and a few unplanned shutdowns and power reductions, production of tritium and releases increased strongly in 2005. As a result, the Krsko NPP hardly succeeded to stay within regulatory limits on tritium releases. However, the three-months' limit was exceeded in the first quarter of 2006. On the basis of conclusions acquired from the SNSA's study and practice of other European countries the SNSA considerably increased the annual limit of permitted liquid tritium releases (from 20 TBq to 45 TBq) and abolished the three-months' limit. At the same time, the SNSA reduced the limit of fission and activation products by halves. (author)

  9. Brief Assessment of Krsko NPP Decommissioning Costs

    International Nuclear Information System (INIS)

    Skanata, D.; Medakovic, S.; Debrecin, N.

    2000-01-01

    The first part of the paper gives a brief description of decommissioning scenarios and models of financing the decommissioning of NPPs. The second part contains a review of decommissioning costs for certain PWR plants with a brief description of methods used for that purpose. The third part of the paper the authors dedicated to the assessment of decommissioning costs for Krsko NPP. It does not deal with ownership relations and obligations ensuing from them. It starts from the simple point that decommissioning is an structure of the decommissioning fund is composed of three basic cost items of which the first refers to radioactive waste management, the second to storage and disposal of the spent nuclear fuel and the third to decommissioning itself. The assessment belongs to the category of preliminary activities and as such has a limited scope and meaning. Nevertheless, the authors believe that it offers a useful insight into the basic costs that will burden the decommissioning fund of Krsko NPP. (author)

  10. Reracking Possibilities of the NPP Krsko Spent Fuel Pool

    International Nuclear Information System (INIS)

    Bace, M.; Pevec, D.; Smuc, T.

    1998-01-01

    Using the SCALE-4 code package reracking possibilities of the NPP Krsko spent fuel pool were analyzed. Two cases were considered: the first case assuming the 40 years lifetime of the plant, and the second case assuming the 50 years lifetime of the plant. It was shown that it is possible to design the additional racks in free space of the spent fuel pool with the sufficient total capacity to store all the spent fuel generated during the 40 years lifetime of the plant. In the case of 50 years plant lifetime, completely new racks (capacity of 1890 spent fuel assemblies), containing 4mm boral in storage cell walls, were proposed for the NPP Krsko spent fuel pool. The effective multiplication factor of the spent fuel pool fully loaded with new racks containing spent fuel assemblies of initial enrichment 4.3 w/o, burned to 40 GWd/tU and cooled 2 years is lower than the value required by standard. It showed the possibility of the safe disposal of all spent fuel accumulated during more than 50 years lifetime of the plant. (author)

  11. Utilization of NPP Krsko plant specific simulator

    International Nuclear Information System (INIS)

    Fifnja, I.; Pribozic, F.; Krajnc, J.

    2002-01-01

    NPP Krsko started with licensed operator training using its own plant-specific full scope simulator in April 2000. Today, two years after simulator was completed, the benefits of simulator use are visible in various fields. The simulator was effectively used to conduct licensed operator continuing training and practical examinations. Two-year continuous training program was designed to help maintain and improve operator performance. The simulator was also used to provide just-in-time training prior to plant evolutions. Together with licensed operators the non-licensed operators are also included into simulator training to provide affective team training opportunity and to foster good communication and increase scenario realism. Now, the first group of initial licensed operator training using plant-specific simulator is also almost completed. It is the first time that NPP Krsko training department conducted complete initial training and this will represent the great experience for future training. Besides training, the simulator was also utilized for procedure development and validation, operating standards development, testing of plant modifications and other activities, like emergency preparedness procedures validation and training exercises.(author)

  12. Arrangement of the Krsko NPP protection scheme for the power system malfunction cases

    International Nuclear Information System (INIS)

    Omahen, P.; Pavsek, J.; Dirnbek, V.

    1996-01-01

    The Krsko NPP has been designed with the capability to reject 100% of its rated power and runback to the station electrical load. However, an adequate detection system of the outside network degradation is needed for the activation of the existing load drop anticipated (LDA) function. The Krsko NPP electrical, turbine and generator protection systems were carefully evaluated in order to redesign some of its functions. These additional functions should be able to protect and disconnect the plant from the system whenever some serious trouble of the outside electric power system is detected. On the other side, preventive measures should be introduced to avoid unnecessary plant disconnection or unnecessary power system collapse due to such disconnection. At the end, the paper presents a precise design of additional function possibilities for the Krsko NPP electrical protection system. A critical evaluation of these functions is given and the best option is proposed. (author)

  13. NPP Krsko core calculations to improve operational safety

    International Nuclear Information System (INIS)

    Ivekovic, I.; Grgic, D.; Nemec, T.

    2007-01-01

    Calculation tools and methodology used to perform independent calculations of cumulative influence of different changes related to fuel and core operation of NPP Krsko were described. Some examples of steady state and transient results are used to illustrate potential improvements to understanding and reviewing plant safety. (author)

  14. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  15. Axial blanket enrichment optimization of the NPP Krsko fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    2001-01-01

    In this paper optimal axial blanket enrichment of the NPP Krsko fuel is investigated. Since the optimization is dictated by economic categories that can significantly vary in time, two step approach is applied. In the first step simple relationship between the equivalent change in enrichment of axial blankets and central fuel region is established. The relationship is afterwards processed with economic criteria and constraints to obtain optimal axial blanket enrichment. In the analysis realistic NPP Krsko conditions are considered. Except for the fuel enrichment all other fuel characteristics are the same as in the fuel used in the few most recent cycles. A typical reload cycle after the plant power uprate is examined. Analysis has shown that the current blanket enrichment is close to the optimal. Blanket enrichment reduction results in an approximately 100 000 US$ savings per fuel cycle.(author)

  16. System, economy and ecology viewpoints of the Krsko NPP lifetime extension

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Zagar, T.; Pirs, B.; Bole, A.; Bregar, Z.; Cuhalev, I.; Derganc, B.; Ivanjko, S.; Matvoz, D.; Sustersic, A.; Valencic, L.; Zabric, I.; Zlatarev, G.; Babuder, M.

    2007-01-01

    Krsko NPP plant life extension was analysed and evaluated with respect to system, economy and ecology viewpoints. From the system perspective it was established that also in the extended lifetime the plant will remain in operation as a base load electricity supplier. The systematic review was performed to determine its overall competitiveness against advanced coal, gas and new nuclear units. The analysis considered also hydro and renewable sources. Analysis and evaluations resulted in the conclusion that the Krsko NPP lifetime extension is the most effective alternative for base load production due to small additional capital investments, low fuel costs, no new siting requirements, lowest climate and environmental impact, and reliable and safe operation. (author)

  17. Containment Leakage Rate Testing Program in NPP Krsko

    International Nuclear Information System (INIS)

    Dudas, M.; Heruc, Z.

    2002-01-01

    NPP Krsko adopted new regulations for testing of the reactor building containment as stipulated by 10CFR50 (Code of Federal Regulation) Appendix J, Option B instead of the previous requirement 10CFR50 Appendix J now renamed to 10CFR50 Appendix J, Option A. In the USA a thorough analyses of nuclear power plants reactor building containment testing was conducted. As part of these analyses the test results obtained from testing of various reactor-building containments in the last ten years were reviewed. It was concluded that it would be meaningful to, based on test results historical data, reconsider possibility of redefining testing intervals. The official proposal of such approach was reviewed and approved by the NRC and published in September of 1995 in the FR Vol.60 No.186. Based on directions from 10CFR50 Appendix J, Option B, the new criteria for definition of test intervals were created. Criteria were based upon past performance during testing (Performance-based Requirements) and safety impact. At NPP Krsko, the analyses of the Reactor Building Containment. Integrity Test results was performed . This included test results of the Containment Integrated Leak Rate Testing (CILRT or Type A tests), Containment Isolation Valves Local Leak Rater Tests (Type C tests) and Mechanical and Electrical Penetrations Local Leak Rate tests (Type B tests). In accordance with instructions from NEI 94-01 and based on analyses of test results, NPP Krsko created Containment Leakage Rate Testing Program with the purpose to establish the performance-based definition of test intervals, inspection scope, trending and reporting. Equally, the program gives instructions how to evaluate test results and how to deal with the containment penetration or isolation valve repair contingency. All changes caused with transition from Option A to Option B are marginal to public safety. (author)

  18. Evaluation of the safety margins during shutdown for NPP Krsko

    International Nuclear Information System (INIS)

    Bencik, V.; Sadek, S.; Bajs, T.

    2004-01-01

    In the paper the results of RELAP5/mod3.3 calculations of critical parameters during shutdown for NPP Krsko are presented. Conservative evaluations have been performed at NPP Krsko to determine the minimum configuration of systems required for the safe shutdown operation. Critical parameters in these evaluations are defined as the time to start of the boiling and the time of the core dry-out. In order to have better insight into the available margins, the best estimate code RELAP5/mod3.3 has been used to calculate the same parameters. The analyzed transient is the loss of the Residual Heat Removal (RHR) system, which is used to remove decay heat during shutdown conditions. Several configurations that include open and closed Reactor Coolant System (RCS) were considered in the evaluation. The RELAP5/mod3.3 analysis of the loss of the RHR system has been performed for the following cases: 1) RCS closed and water solid, 2) RCS closed and partially drained, 3) Pressurizer manway open, Steam Generator (SG) U tubes partially drained, 4) Pressurizer and SG manways open, SG U tubes completely drained, 5) Pressurizer manway open, SGs drained, SG nozzle dams installed and 6) SG nozzle dams installed, pressurizer manway open, 1 inch break at RHR pump discharge in the loop with pressurizer. Both RHR trains were assumed in operation prior to start of the transient. The maximum average steady state temperature for all analyzed cases was limited to 333 K. (author)

  19. Equipment performance monitoring in NPP Krsko (Summarized system health report)

    International Nuclear Information System (INIS)

    Djetelic, N.; Cicvaric, D.

    2004-01-01

    Management common goal is safe, reliable, effective, acceptable to public and conservative/cautious operation of NPP Krsko. A set of programs, including Corrective Action Program, Performance Indicators, Operating Experience, Self Assessment and System Health Report, is developed to assist NPP Krsko management in fulfilling those goals. System Health Report is a tool that management can use to quickly assess how selected systems are performing, to determine where additional management attention is required and to determine if appropriate corrective actions have been established. Summarized System Health Report is developed for management's quick overview of systems status, important system malfunctions and problems as well as major changes from previous assessment period. Summarized Report contains nine sections: status difference including brief explanation, selected performance indicators, new equipment problems, functional failures, important problem analyses, action plan for systems with Potential Danger (RED) status, maintenance rule status overview and systems availability (planned and unplanned).(author)

  20. NPP Krsko Severe Accident Management Guidelines Implementation

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.; Bilic-Zabric, T.; Spiler, J.

    2002-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. The USA NRC has indicated that the development of a licensee plant specific accident management program will be required in order to close out the severe accident regulatory issue (Ref. SECY-88-147). Generic Letter 88-20 ties the Accident management Program to IPE for each plant. The SECY-89-012 defines those actions taken during the course of an accident by the plant operating and technical staff to: 1) prevent core damage, 2) terminate the progress of core damage if it begins and retain the core within the reactor vessel, 3) maintain containment integrity as long as possible, and 4) minimize offsite releases. The subject of this paper is to document the severe accident management activities, which resulted in a plant specific Severe Accident Management Guidelines implementation. They have been developed based on the Krsko IPE (Individual Plant Examination) insights, Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidances) and plant specific documents developed within this effort. Among the required plant specific actions the following are the most important ones: Identification and documentation of those Krsko plant specific severe accident management features (which also resulted from the IPE investigations). The development of the Krsko plant specific background documents (Severe Accident Plant Specific Strategies and SAMG Setpoint Calculation). Also, paper discusses effort done in the areas of NPP Krsko SAMG review (internal and external ), validation on Krsko Full Scope Simulator (Severe Accident sequences are simulated by MAAP4 in real time) and world 1st IAEA Review of Accident Management Programmes (RAMP). (author)

  1. Risk assessment of the Krsko NPP normal operation on the public in the Zagreb area

    International Nuclear Information System (INIS)

    Skanata, D.; Pevec, D.

    1994-01-01

    In the paper, a very short review of the ICRP recommendations related to effective dose limitation for the workers as well as for the public, is given. Particular attention is paid to the risk coefficients values. In the short manner, description of the applied methodology and achieved result related to the risk assessment of the Krsko NPP normal operation on the public in the Zagreb Area, are given too. The mentioned assessment was performed as an activity within the Case Study Zagreb Project developed under the Inter-Agency Programme on the Assessment and Management of Health and Environmental Risks from Energy and Other Complex Industrial Systems (UNEP, WHO, IAEA and UNIDO). Making comparison between assessment risk of the Krsko NPP normal operation and risks to which inhabitants of the City of Zagreb are normally exposed, it is concluded that living in the vicinity of such nuclear power plant as it is Krsko NPP (PWR, 664 MWe), is not so risky as risky are some everyday activities

  2. The new revision of NPP Krsko decommissioning, radioactive waste and spent fuel management program: analyses and results

    International Nuclear Information System (INIS)

    Zeleznik, Nadja; Kralj, Metka; Lokner, Vladimir; Levanat, Ivica; Rapic, Andrea; Mele, Irena

    2010-01-01

    The preparation of the new revision of the Decommissioning and Spent Fuel (SF) and Low and Intermediate level Waste (LILW) Disposal Program for the NPP Krsko (Program) started in September 2008 after the acceptance of the Term of Reference for the work by Intergovernmental Committee responsible for implementation of the Agreement between the governments of Slovenia and Croatia on the status and other legal issues related to investment, exploitation, and decommissioning of the Nuclear power plant Krsko. The responsible organizations, APO and ARAO together with NEK prepared all new technical and financial data and relevant inputs for the new revision in which several scenarios based on the accepted boundary conditions were investigated. The strategy of immediate dismantling was analyzed for planned and extended NPP life time together with linked radioactive waste and spent fuel management to calculate yearly annuity to be paid by the owners into the decommissioning funds in Slovenia and Croatia. The new Program incorporated among others new data on the LILW repository including the costs for siting, construction and operation of silos at the location Vrbina in Krsko municipality, the site specific Preliminary Decommissioning Plan for NPP Krsko which included besides dismantling and decontamination approaches also site specific activated and contaminated radioactive waste, and results from the referenced scenario for spent fuel disposal but at very early stage. Important inputs for calculations presented also new amounts of compensations to the local communities for different nuclear facilities which were taken from the supplemented Slovenian regulation and updated fiscal parameters (inflation, interest, discount factors) used in the financial model based on the current development in economical environment. From the obtained data the nominal and discounted costs for the whole nuclear program related to NPP Krsko which is jointly owned by Slovenia and Croatia have

  3. Krsko NPP radioactive waste characteristics

    International Nuclear Information System (INIS)

    Skanata, D.; Kroselj, V.; Jankovic, M.

    2007-01-01

    In May 2005 Krsko NPP initiated the Radioactive Waste Characterization Project and commissioned its realization to the consulting company Enconet International, Zagreb. The Agency for Radwaste Management was invited to participate on the Project. The Project was successfully closed out in August 2006. The main Project goal consisted of systematization the existing and gathering the missing radiological, chemical, physical, mechanical, thermal and biological information and data on radioactive waste. In a general perspective, the Project may also be considered as a part of broader scope of activities to support state efforts to find a disposal solution for radioactive waste in Slovenia. The operational low and intermediate level radioactive waste has been structured into 6 waste streams that contain evaporator concentrates and tank sludges, spent ion resins, spent filters, compressible and non-compressible waste as well as specific waste. For each of mentioned waste streams, process schemes have been developed including raw waste, treatment and conditioning technologies, waste forms, containers and waste packages. In the paper the main results of the Characterization Project will be briefly described. The results will indicate that there are 17 different types of raw waste that have been processed by applying 9 treatment/conditioning technologies. By this way 18 different waste forms have been produced and stored into 3 types of containers. Within each type of container several combinations should be distinguished. Considering all of this, there are 34 different types of waste packages altogether that are currently stored in the Solid Radwaste Storage Facility at the Krsko NPP site. Because of these findings a new identification system has been recommended and consequently the improvement of the existing database on radioactive waste has been proposed. The potential areas of further in depth characterization are indicated. In the paper a brief description on the

  4. Trending of Events - Practical Use at Krsko NPP

    International Nuclear Information System (INIS)

    Skaler, F.; Bach, B.

    2008-01-01

    Krsko NPP (NEK) in 2004 developed a new application, a corrective action program (CAP) software, to acquire all events within the same environment. In 2006 NEK started to code all acquired records of the events. In 2007 NEK developed within CAP application new tools for analyzing the events. These new tools are common cause analyses Root cause, Direct causes, Processes, and Equipment failures. The new tools are user friendly and easy to use. With these new tools the useful queries are generated easily. The results are presented in graphs, which have drill down options all the way down to the reported event itself. With these new tools many common cause analyses can be done within seconds, which in the past took hours or even days. Also the department leads can easily perform common cause analyses within their departments or processes, they can compare the different periods or projects and they can look for different type of causes. NEK next step is a learning module for the department leads. They have to learn how to use these tools and to understand the results correctly. NEK has to establish the process, where these analyses can be formalized, checked and the most effective correction actions to prevent the events can be taken. Also all the process can be formalized. The presentation will explain the theory of trending the minor events and practical implementation at Krsko NPP. The presentation will also present the new tools in CAP application with some very interesting examples of common cause analyses. The presentation will explain possibilities for the future process at NEK to fully implement these tools in order to prevent the events.(author)

  5. New version of NPP Krsko Decommissioning program and LILW and spent fuel management

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.; Jenko, T.; Lokner, V.; Levanat, I.; Rapic, A.

    2004-01-01

    According to the requirements of the bilateral agreement between Republic of Slovenia and Republic of Croatia on the legal and other obligations for Nuclear power plant (NPP) Krsko the Decommissioning program was prepared. The main purpose of the program was to estimate the overall expenses of the future decommissioning, radioactive waste and spent fuel management of the NPP Krsko in order to establish separate fund in Croatia and to correct the rate per kWh collected in the existing decommissioning fund in Slovenia. The program looked at all possible scenarios of dismantling, radioactive waste and spent fuel management and proposed the most plausible two scenarios which are technically possible and financially feasible. (author)

  6. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  7. Use of the deterministic safety analyses in support to the NPP Krsko modification

    International Nuclear Information System (INIS)

    Feretic, D.; Cavlina, N.; Debrecin, N.; Grgic, D.; Bajs, T.; Spalj, S.

    2004-01-01

    The ultimate goal of the safety analysis is to verify that Nuclear Power Plant (NPP) meets safety and operational requirements. To this aim it is necessary to demonstrate that plant safety has not been deteriorated in the case of the modifications to the plant Systems, Structures and Components (SSC) or changes to the plant procedures. In addition, safety analyses are needed in the case of reassessment of an existing plant. The reasons for reassessment may be different, e.g. due to the changes in the methodology and assumptions used in the original design, if the original design basis or acceptance criteria may no longer be adequate, if the safety analysis tools used may have been superseded by more sophisticated methods or if the original design basis may no longer be met. The operation of the NPP Krsko has experienced numerous changes from the original design for the majority of the reasons that have been mentioned before. On the other side, the application of the large best-estimate thermalhydraulic codes has evolved to the wide spread support in the operation of the NPP: compliance with the regulatory goals, support to the PSA studies, analysis of the operational transients, plant modifications studies, equipment qualification, training of the operators, preparation of the operating procedures, etc. This trend has been followed at the Faculty of Electrical Engineering Zagreb (FER) and applied to the on-going needs due to the modifications and changes at NPP Krsko. In this paper, an overview of the deterministic safety analyses performed at FER in the support to the NPP Krsko modifications and changes is presented.(author)

  8. Prospects for the NPP Krsko Radioactive Waste Management

    International Nuclear Information System (INIS)

    Knapp, A.; Levanat, I.; Saponja-Milutinovic, D.

    2016-01-01

    Croatia adopted Strategy of radioactive waste, used sources and spent fuel management in 2014, and its Law on radiological and nuclear safety was accordingly modified in 2015. The Strategy foresees (though with some flexibility) and the Law declares decidedly that Croatia will establish a Center for radioactive waste management, in which all necessary facilities for storage and subsequent disposal of the Croatian share of the NPP Krsko radioactive waste and spent fuel will be developed. However, Slovenia and Croatia have recently agreed that a long-term dry storage for spent fuel will be established on the NPP premises by the year 2019. Therefore, only the issues of low and intermediate level waste (LILW) are addressed here. In Slovenia, the LILW repository site Vrbina in Krsko municipality was officially confirmed in 2009. Based on the 2013 investment program for a silo-type disposal facility, preparation of the repository project documentation was contracted with a national engineering company in 2014. Slovenian repository concept has been developed in two variants: one for the Slovenian LILW only, and the other intended to accept the Croatian share of LILW from the NPP as well. In the summer of 2015 Slovenia for the first time made an official offer to Croatia to use Vrbina repository for that purpose. However, the Croatian Strategy also does not preclude the option of management of all LILW from the NPP in Croatia. Therefore, present plan of activities for the third revision of the NPP radioactive waste and spent fuel management program outlines hypothetically symmetrical LILW management options: all in Slovenia, or all in Croatia, or one half in each country. So, what shall it be? This paper discusses the prospects for each of the three above mentioned options. The major problem of the Slovenian disposal plan is its high cost, mostly due to high compensations to the local community, which will be hard to finance without Croatian participation. The simplest

  9. NPP Krsko containment environmental conditions during postulated accident

    International Nuclear Information System (INIS)

    Kozaric, M.; Cavlina, N.; Spalj, S.

    1989-01-01

    This paper presents NPP Krsko containment pressure and temperature increase during Loss of Coolant Accident (LOCA) and Main Steam Line Break (MSLB). Containment environmental condition calculation was performed by CONTEMPT4/MOD4 computer code. Design accident calculations were performed by RELAP4/MOD6 and RELAP5/MOD1 computer codes. Calculational abilities and application methodology of these codes are presented. The CONTEMPT code is described in more detail. The containment pressure and temperature time distribution are presented as well. (author)

  10. Environmental qualification program for Krsko NPP

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Freeland, K.R.; Spalj, S.

    1998-01-01

    NEK plant components, including those critical to safe plant operation, deteriorate and wear over service life due to the effects of aging and harsh environmental conditions. Since the plant environment is a source of common-cause failures, an Environmental Qualification (EQ) program is required to ensure and demonstrate the ability of safety-related equipment to perform its design safety function during a design-basis (DBE), even after aging over its service life in the plant. EQ is a requirement for plants licensed by the US NRC, in accordance with 10 CFR 50.49, Regulatory Guide 1.89, NUREG-0588, and IEEE-323. This paper presents the current EQ Program status at Krsko NPP.(author)

  11. Croatian Capacity for Management of the NPP Krsko Radioactive Waste

    International Nuclear Information System (INIS)

    Levanat, Ivica; Lokner, Vladimir

    2014-01-01

    Together with Slovenia, Croatia is responsible for management of the NPP Krsko radioactive waste and spent fuel. So far, no firm agreement on specific solutions has been reached between the two countries. On the contrary, all activities related to revision and development of the joint Program of the NPP decommissioning and spent fuel and radioactive waste management were discontinued several years ago. Unless Slovenia and Croatia definitely agree on joint solutions in the meantime, Croatia will have to begin transfer of one half of the NPP Krsko spent fuel and radioactive waste into its territory in about nine years. Presently, however, Croatian capacities for such an undertaking are seriously inadequate in several respects, and they are not developing in any promising way. For no rational reason, this state of the Croatian capacities has been maintained (recently even deteriorating in some respects) for at least a decade, disregarding also for at least two years the explicit requirements of the EU Directive 2011/70/EURATOM aimed at establishing a Community framework for the responsible and safe management of spent fuel and radioactive waste. In fall of 2012, Fund for financing the NPP Krsko decommissioning and spent fuel and radioactive waste disposal was appointed as the Croatian expert organization for revision and development of the program of these same activities it had originally been supposed only to finance. In 2013 the Fund expanded its activities to a low-profile attempt at revitalization of the Croatian radioactive waste repository project, although the Fund is not yet properly capacitated for either of these tasks. The above is hardly in compliance with the Directive requirements, such as to establish 'a national legislative, regulatory and organisational framework' 'that allocates responsibility... between relevant competent bodies'. The lack of competent experts in the field appears to affect the quality of Croatian legislative

  12. ATWS thermal-hydraulic analysis for Krsko Full Scope Simulator validation

    International Nuclear Information System (INIS)

    Parzer, I.; Kljenak, I.

    2005-01-01

    The purpose of this analysis was to simulate Anticipated Transient without Scram transient for Krsko NPP. The results of these calculations were used for annual ANSI/ANS validation of reactor coolant system thermal-hydraulic response predicted by Krsko Full Scope Simulator. For the thermal-hydraulic analyses the RELAP5/MOD3.3 code and the input model for NPP Krsko, delivered by NPP Krsko, was used. In the presented paper the most severe ATWS scenario has been analyzed, starting with the loss of Main Feedwater at both steam generators. Thus, gradual loss of secondary heat sink occurred. On top of that, control rods were not supposed to scram, leaving the chain reaction to be controlled only by inherent physical properties of the fuel and moderator and eventual actions of the BOP system. The primary system response has been studied assuming AMSAC availability. (author)

  13. Internal Audits and Quality Assurance Surveillance in NPP Krsko

    International Nuclear Information System (INIS)

    Cavajda, M.; Bracic, I.

    1996-01-01

    This paper is describing establishment of the requirements for the development and execution of the Internal Audit and Quality Assurance Surveillance Program in the NPP Krsko, to identify relevant regulatory commitment and other documents, and to exhibit different functional areas, levels and work categories and factors that impact selecting and scheduling an audit or surveillance. It is not intention of this paper to explain how and by whom an audit or surveillance has to be done. (author)

  14. Evaluation of rod insertion issue for NPP Krsko

    International Nuclear Information System (INIS)

    Gunstek, A.; Kurincic, B.

    1998-01-01

    The last couple of years incident with control rods sticking in lower part of the fuel assemblies have been reported of several reactor operators and fuel vendors throughout of the world. Several activities were initiated immediately to determine the root cause of incomplete rod insertion. The purpose of this activities were to collect plants trip history data and testing results, review of available worldwide experience, review of plant operation and fuel management, detailed review of manufacturing and material property and to maintain detailed mechanical model. In this paper, we will present activities in Nuclear Power Plant Krsko which have been performed after NRC initiated the Root Cause Process (NRC Bulletin 96-01). NPP Krsko has not experienced rod insertion anomaly yet but anyway the additional tests were carried out. Rod drop time measurements that were performed normally at beginning of cycle at nominal temperature and pressure (HSB mode) have been extended also to end of cycle. Rod drop time, velocity of dropped rods and magnitudes of the initial recoil bounces vs. burnup were also analyzed. Also RCCA drag test with upper internals in place and drive shafts attached to RCCAs has been performed since then. At last two outages (1997 and 1998) drag test were carried out with digital scale meter to gather additional information. In addition to that, the reload core design has been performed with new constrains on rodded fuel assembly burnup as proposed by the industry.(author)

  15. Some results of Krsko NPP core calculations and comparison with measurements

    International Nuclear Information System (INIS)

    Trkov, A.; Zefran, B.; Kromar, M.; Ravnik, M.; Slavic, S.

    1996-01-01

    Current status of the CORD-2 package is described. Results of the predictions of some important reactor core parameters are presented for the 12 th operation cycle of the Krsko NPP. Comparison with measurements is made to illustrate that the accuracy of the calculations is acceptable. Some comments are made on the enhancements, which are currently being implemented on the package. (author)

  16. Plant performance monitoring program at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2004-01-01

    A high level of nuclear safety and plant reliability results from the complex interaction of a good design, operational safety and human performance. This is the reason for establishing a set of operational plant safety performance indicators, to enable monitoring of both plant performance and progress. Performance indicators are also used for setting challenging targets and goals for improvement, to gain additional perspective on performance relative to other plants and to provide an indication of a potential need to adjust priorities and resources to achieve improved overall plant performance. A specific indicator trend over a certain period can provide an early warning to plant management to evaluate the causes behind the observed changes. In addition to monitoring the changes and trends, it is also necessary to compare the indicators with identified targets and goals to evaluate performance strengths and weaknesses. Plant Performance Monitoring Program at Krsko NPP defines and ensures consistent collection, processing, analysis and use of predefined relevant plant operational data, providing a quantitative indication of nuclear power plant performance. When the program was developed, the conceptual framework described in IAEA TECDOC-1141 Operational Safety Performance Indicators for Nuclear Power Plants was used as its basis in order to secure that a reasonable set of quantitative indications of operational safety performance would be established. Safe, conservative, cautious and reliable operation of the Krsko NPP is a common goal for all plant personnel. It is provided by continuous assurance of both health and safety of the public and employees according to the plant policy stated in program MD-1 Notranje usmeritve in cilji NEK, which is the top plant program. Establishing a program of monitoring and assessing operational plant safety performance indicators represents effective safety culture of plant personnel.(author)

  17. Engineering safety review mission Krsko NPP external events PSA. Ljubljana, Slovenia 19-23 February 1996. Final report

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Smith, P.

    1996-01-01

    Within the scope of the TC Project RER/9/035, a review mission visited Ljubljana, Slovenia, 19-23 February 1996. Two outside experts, Messrs. R.J. Budnitz (USA) and Paul Smith (USA), as well as a staff member, A. Guerpinar (ESS-NSNI) took part in the review. The purpose of the mission was to assist the Slovenian Nuclear Safety Administration to review the external events PSA prepared by Krsko NPP consultants Westinghouse Energy Systems Europe and EQE International. Another seismic safety review was performed concurrently in Ljubljana involving the investigations in relation to the tectonic stability and reassessment of the design basis ground motion characterization for the Krsko NPP site

  18. Heat and radiation analysis of NPP Krsko irradiated fuel

    International Nuclear Information System (INIS)

    Lalovic, M.

    1986-01-01

    Radioactive and heat potential for irradiated fuel in the region 2 with burnup of 13400 MWd/tHM, and in the region 4A with burnup of 9360 MWd/tHM for NPP KRSKO, was calculated. Computer code KORIGEN (Karlsruhe Oak Ridge Isotope Generation and Depletion Code) was used. The aspects of radiation (mainly gamma and neutrons) and of heat production was considered with respect to their impact on fuel handing and waste management. Isotopic concentrations for irradiated fuel was calculated and compared with Westinghouse data. (author)

  19. Reactor Coolant Pump Motor Maintenance Experience in Krsko NPP

    International Nuclear Information System (INIS)

    Vukovic, J.; Besirevic, A.; Boljat, Z.

    2016-01-01

    After thirty years of service as well as maintenance in Krsko NPP both original Reactor Coolant Pump (RCP) motors are remanufactured by original vendor Westinghouse and a new one was purchased. Design function of the RCP motor is to drive Reactor Coolant Pump and for coast-down feature during Design Basis Accident. This paper will give a view on maintenance issues of RCP motor during the thirty years of service and maintenance in Krsko NPP to be kept functionally operational. During the processes of remanufacturing inspection and disassembly it was made possible to get a deeper perspective in the motor condition and the wear or fatigue of the motor parts. Parameters like bearing & winding temperature, absolute and relative vibration greatly affect motor operation if not kept inside design margins. Rotational speed causes heat generation at the bearings which is then associated with oil temperatures and as a consequence bearing temperatures. That is why the most critical parts of the motor are the components of upper and lower bearing assembly. The condition of motor stator and rotor assembly technical characteristics shall be explained with respect to influence of demanding environmental conditions that the motor is exposed. Assessment shall be made how does the wear of critical RCP motor parts can influence reliable performance of the motor if not maintained in proper way. Information on upgrades that were done on RCP motor shall be shared: Oil Spillage Protection System (OSPS), Stator upgrades, Dynamic Port, etc. (author).

  20. Analysis of the network protection devices action connected with the Krsko NPP operation safety

    International Nuclear Information System (INIS)

    Omahen, P.; Struc, S.

    1995-01-01

    The example of failure that took place in Zagreb on 30 March, 1995, has been investigated in order to obtain appropriate answers to the unexpected electric power system (ESP) response and consecutive outage of the Krsko nuclear power plant (NPP). The analysis has been made of particular operating and stability conditions, related to the functioning of distance relays line protection. Using a consequent simulation model of the EPS (European interconnection) under specified fault condition, the research of EPS operation (relays action) and stability has been done. The appropriate simulation results have been compared to the available measured data which had been collected by the SOREL on-line data acquisition system. In the end, a practise proposal for measures to be taken with the target of achieving the foreseen and expected operation of the EPS equipment that effects operation of the Krsko NPP is given. (author)

  1. Corrective action program at Krsko NPP

    International Nuclear Information System (INIS)

    Skaler, F.; Divjak, G.; Kavsek, D.

    2004-01-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  2. Corrective action program at Krsko NPP

    Energy Technology Data Exchange (ETDEWEB)

    Skaler, F; Divjak, G; Kavsek, D [NPP Krsko, Krsko (Slovenia)

    2004-07-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  3. NPP Krsko simulator training for operations personnel

    International Nuclear Information System (INIS)

    Pribozic, F.; Krajnc, J.

    2000-01-01

    Acquisition of a full scope replica simulator represents an important achievement for Nuclear power Plant Krsko. Operating nuclear power plant systems is definitely a set of demanding and complex tasks. The most important element in the goal of assuring capabilities for handling such tasks is efficient training of operations personnel who manipulate controls in the main control room. Use of a simulator during the training process is essential and can not be substituted by other techniques. This article gives an overview of NPP Krsko licensed personnel training historical background, current experience and plans for future training activities. Reactor operator initial training lasts approximately two and a half years. Training is divided into several phases, consisting of theoretical and practical segments, including simulator training. In the past, simulator initial training and annual simulator retraining was contracted, thus operators were trained on non-specific full scope simulators. Use of our own plant specific simulator and associated infrastructure will have a significant effect on the operations personnel training process and, in addition, will also support secondary uses, with the common goal to improve safe and reliable plant operation. A regular annual retraining program has successfully started. Use of the plant specific simulator assures consistent training and good management oversight, enhances conformity of operational practices and supports optimization of operating procedures. (author)

  4. SB LOCA analyses for Krsko Full Scope Simulator verification

    International Nuclear Information System (INIS)

    Prosek, A.; Parzer, I.; Mavko, B.

    2000-01-01

    Nuclear power plant simulators are intended to be used for training and maintaining competence to ensure safe, reliable operation of nuclear power plants throughout the world. The simulator shall be specified to a reference unit and its performance validation testing shall be provided. In this study a small-break loss-of-coolant accident (SB LOCA) response of Krsko nuclear power plant (NPP) was calculated for full scope simulator verification. The investigation included five cases with varying the break size in the cold leg of reactor coolant system. The plant specific and verified RELAP5/MOD2 model of Krsko nuclear power plant (NPP), developed in the past for 1882 MWt power, was adapted for 2000 MWt power (cycle 17) including the model for replacement steam generators. The results showed that the plant system response to breaks with small break area was slower compared to breaks with larger break area. The core heatup occurred in most of the cases analyzed. The acceptance criteria for emergency core cooling system were also met. The predicted results of the SB LOCA analysis for Krsko NPP suggest that they may be used for verification of the Krsko Full Scope Simulator performance. (author)

  5. Use of a Computerized Tool (ORAM) to Help Manage Outage Safety and Risk at NPP Krsko

    International Nuclear Information System (INIS)

    Spiler, J.; Basic, I.; Vrbanic, I.; Fifnja, I.; Kastelan, M.; Dagan, W. J.; Shanley, L. B.; Naum, T. J.

    1998-01-01

    Outage Risk Assessment and Management (ORAM) is a computerized methodology developed by the U.S. Electric Power Research Institute (EPRI) to help Nuclear Power Plant personnel manage the risk and safety associated with refueling and forced plant outages. Today, over 60 plants including NPP Krsko are using ORAM during the preparation and performance of plant outages. In fact, many plants are attributing much of the reductions in the duration of refueling outages to the use of ORAM. The success of the ORAM methodology is the capability to provide plant and management personnel with understandable results from both deterministic evaluations of plant safety and quantitative risk assessments. The Nuklearna Elektrarna Krsko (NEK) use of ORAM involves both of these approaches. The deterministic portion of ORAM is used to model the NPP Krsko Shutdown Technical Specifications and administrative considerations. The probabilistic portion of ORAM uses industry and NEK specific initiating events and other risk elements pertaining to shutdown to derive a quantitative risk assessment for various end states, including core damage and RCS boiling. This paper expands on the value of each approach and demonstrates the benefits of combining these elements in the decision-making process. Another key advantage of ORAM is the ability to apply the methodology to specific outages. Since no outage is identical, this provides tremendous benefits to plant personnel for managing the safety and risk of a particular outage. ORAM does this ba organizing all of the various plant configurations and equipment unavailability windows into numerous plant states. Furthermore, ORAM evaluations can be a utomated b y interfacing with outage scheduling software programs such as Primavera. For each plant state, the deterministic and the probabilistic logic evaluations are applied. This paper will demonstrate the ORAM evaluation for an actual NPP Krsko outage. (author)

  6. Validation of the CORD-2 System for the Nuclear Design Calculations of the NPP Krsko Core

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    2016-01-01

    The CORD-2 package intended for core design calculations of PWRs has be recently updated with some improved models. Since the modifications could substantially influence the obtained results, a technical validation process is required. This paper presents comparison of some calculated and measured parameters of the NPP Krsko core needed to qualify the package. Critical boron concentrations at hot full power for selected cycle burnup points and several parameters obtained during the start-up testing at the beginning of each cycle (hot zero power critical concentration, isothermal temperature coefficient and rods worth) for all 27 finished cycles of operation are considered. In addition, assembly-wise power distribution for some selected cycles is checked. Comparison has shown very good agreement of the CORD-2 calculated values with the selected measured parameter of the NPP Krsko core.(author).

  7. Relationship towards Engineering, Quality Assurance and 10CFR50.59 in the Design Change Process at the Krsko NPP

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.

    1998-01-01

    The paper discusses the relationship between the Krsko NPP design change engineering practice, quality assurance and the USA Nuclear Regulatory Commission 10 Code Federal Rule 50.59 (10CFR50.59). Together these controls ensure that plant design bases are maintained and yield a safe design. The 10CFR50.59 has been applied in Krsko NPP plant specific procedure entitled ESP-2.303 ''Authorization of Changes, Tests and Experiments'' (Safety Evaluation Screening) since 1994. All proposed changes requiring Safety Evaluations are being submitted to the SNSA (Slovenian Nuclear Safety Administration). If the proposed change is constituting an ''Unreviewed Safety Question'' the formal licensing procedure shall be completed before design change can be implemented otherwise the proposed design change is rejected. The procedure(ESP-2.303) provides the methodology to be followed in determining if a proposed activity involves an unreviewed safety question. An ''Unreviewed Safety Question'' is essentially the same as defined in 10CFR50.59(a)(2): ''A proposed change, test or experiment shall be deemed to involve an unreviewed safety question (1) if the probability of occurrence or consequences of an accident or malfunction of equipment important to safety previously evaluated in the (updated) safety analysis report may be increased; or (2) if a possibility for an accident or malfunction of a different type than any evaluated previously in the (updated) safety analysis report may be created; or (3) if the margin of safety as defined in the basis for any technical specification is reduced.'' This paper discusses the Following Krsko NPP Safety Evaluation aspects: 1. Defense in Depth Design Philosophy 2. Methodology 3. Definitions and Applicability of Terms 4. Evaluation Process Guidance and Documentation Process 5. Krsko NPP Lessons Learned. (author)

  8. Performance assessment for Nuclear Power Plant Krsko intermediate and low-level rad-waste repository; Provjera sigurnosnih performansi odlagalishta radioaktivnog otpada niske i srednje aktivnosti nuklearne elektrane Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Jelavic, V [Inst. za Elektroprivredu, Zagreb. (Yugoslavia).; Tankosic, Dj [Bechtel Inc., San Francisco (United States); Skanata, D [Nuklearna elektrana Krshko, Krshko (Yugoslavia); Plecjas, I [Institut za Nuklearne Nauke Boris Kidric, Belgrade (Yugoslavia)

    1990-07-01

    Performance safety Assessment for NPP Krsko radwaste repository was performed (LLW/ILW). Shallow land and tunnel type concept were analyzed. Because it was based on two unknown referent sites, one for the shallow land concept and the other for the tunnel type, analysis was generic in nature. Scenario selecting process and consequence analysis were performed by using deterministic approach. Results for both concepts of disposal suggests that proposed NPP Krsko radwaste repository reference site and disposal technology will fully meet radiation limits imposed by the Yugoslav regulations and ICRP guidelines. (author)

  9. ATWS analyses for Krsko Full Scope Simulator verification

    Energy Technology Data Exchange (ETDEWEB)

    Cerne, G; Tiselj, I; Parzer, I [Reactor Engineering Div., Inst. Jozef Stefan, Ljubljana (Slovenia)

    2000-07-01

    The purpose of this analysis was to simulate Anticipated Transient without Scram transient for Krsko NPP. The results of these calculations were used for verification of reactor coolant system thermal-hydraulic response predicted by Krsko Full Scope Simulator. For the thermal-hydraulic analyses the RELAP5/MOD2 code and the input card deck for NPP Krsko was used. The analyses for ATWS were performed to assess the influence and benefit of ATWS Mitigation System Actuation Circuitry (AMSAC). In the presented paper the most severe ATWS scenarios have been analyzed, starting with the loss of Main Feedwater at both steam generators. Thus, gradual loss of secondary heat sink occurred. On top of that, control rods were not supposed to scram, leaving the chain reaction to be controlled only by inherent physical properties of the fuel and moderator and eventual actions of the BOP system. The primary system response has been studied regarding the AMSAC availability. (author)

  10. Analysis of steam generator plugging on core thermohydraulic performance of NPP Krsko; Analiza vpliva cepljenja cevi v upravljaniku na termohidravliko sredice JE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Kostadinov, V; Petelin, S; Sarler, B [Institut Jozef Stefan, Ljubljana (Yugoslavia)

    1988-07-01

    Nuclear safety analysis of NPP Krsko core operating at full power with 4% steam generator tubes plugged have been performed. Influence of individual parameters on core thermohydraulic performance have been evaluated. Using COBRA-III-C computer code we have analysed a core design (evaluation) model. The DNBR change was calculated as a consequence of 4% plugging. The influence of thermohydraulic parameters change on DNBR was analysed. (author)

  11. NPP Krsko analysis of the loss of the RHR system during mid-loop operation

    International Nuclear Information System (INIS)

    Bencik, V.; Feretic, D.; Debrecin, N.

    2002-01-01

    In the paper the results of the NPP Krsko analysis of the loss of the Residual Heat Removal (RHR) system at mid-loop conditions using RELAP5/MOD 3.2.2 Gamma and RELAP5/MOD 3.3 Beta code are presented. Both pressurizer and Steam Generator (SG) 1 manway were open. The facility was open to the containment atmosphere and filled with air above liquid level. Loss of the RHR system when Reactor Coolant System (RCS) is open causes quick boiling in the core and loss of the inventory available for the cooling of the core through the openings. Aims of the analysis were threefold. First, the consequences of the transient for NPP Krsko, i.e., the time to core uncovery was determined. Secondly, the influence of the applied RELAP5 code version (MOD 3.2.2 Gamma and MOD 3.3 Beta) in the analysis of that particular transient with noncondensable gases was assessed. Third, the analysis with SG secondary sides under wet lay-up conditions was performed in order to assess the influence of condensation in the SG U tubes on liquid inventory in the system and core cooling capability.(author)

  12. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  13. LWRA analysis of inadvertent closing of the main steam isolation valve in NPP Krsko

    International Nuclear Information System (INIS)

    Feretic, D.; Cavlina, N.; Grgic, D.; Spalj, S.

    1996-01-01

    The paper describes the use of system code RELAP5/mod2 and analyzer code LWRA in analysis of inadvertent closing of the main steam isolation valve that happened in NPP Krsko on September, 25 1995. Three cases were calculated in order to address different aspects of the modelled transient. This preliminary calculation showed that, even though the real plant behaviour was not completely reproduced, such kind of analysis can help to better understand plant behaviour and to identify important phenomena in the plant during transient. The results calculated by RELAP5 and LWRA were similar and both codes indicated lack of better understanding of the plant systems status. The LWRA was more than 5 times faster than real time. (author)

  14. Performance assessment for Nuclear Power Plant Krsko intermediate and low-level rad-waste repository

    International Nuclear Information System (INIS)

    Jelavic, V.; Skanata, D.; Plecjas, I.

    1990-01-01

    Performance safety Assessment for NPP Krsko radwaste repository was performed (LLW/ILW). Shallow land and tunnel type concept were analyzed. Because it was based on two unknown referent sites, one for the shallow land concept and the other for the tunnel type, analysis was generic in nature. Scenario selecting process and consequence analysis were performed by using deterministic approach. Results for both concepts of disposal suggests that proposed NPP Krsko radwaste repository reference site and disposal technology will fully meet radiation limits imposed by the Yugoslav regulations and ICRP guidelines. (author)

  15. Parameter estimation of component reliability models in PSA model of Krsko NPP

    International Nuclear Information System (INIS)

    Jordan Cizelj, R.; Vrbanic, I.

    2001-01-01

    In the paper, the uncertainty analysis of component reliability models for independent failures is shown. The present approach for parameter estimation of component reliability models in NPP Krsko is presented. Mathematical approaches for different types of uncertainty analyses are introduced and used in accordance with some predisposed requirements. Results of the uncertainty analyses are shown in an example for time-related components. As the most appropriate uncertainty analysis proved the Bayesian estimation with the numerical estimation of a posterior, which can be approximated with some appropriate probability distribution, in this paper with lognormal distribution.(author)

  16. Upgrade of Common Cause Failure Modelling of NPP Krsko PSA

    International Nuclear Information System (INIS)

    Vukovic, I.; Mikulicic, V.; Vrbanic, I.

    2006-01-01

    Over the last thirty years the probabilistic safety assessments (PSA) have been increasingly applied in technical engineering practice. Various failure modes of system of concern are mathematically and explicitly modelled by means of fault tree structure. Statistical independence of basic events from which the fault tree is built is not acceptable for an event category referred to as common cause failures (CCF). Based on overview of current international status of modelling of common cause failures in PSA several steps were made related to primary technical basis for methodology and data used for CCF model upgrade project in NPP Krsko (NEK) PSA. As a primary technical basis for methodological aspects of CCF modelling in Krsko PSA the following documents were considered: NUREG/CR-5485, NUREG/CR-4780, and Westinghouse Owners Group documents (WOG) WCAP-15674 and WCAP-15167. Use of these documents is supported by the most relevant guidelines and standards in the field, such as ASME PRA Standard and NRC Regulatory Guide 1.200. WCAP documents are in compliance with NUREG/CR-5485 and NUREG/CR-4780. Additionally, they provide WOG perspective on CCF modelling, which is important to consider since NEK follows WOG practice in resolving many generic and regulatory issues. It is, therefore, desirable that NEK CCF methodology and modelling is in general accordance with recommended WOG approaches. As a primary basis for CCF data needed to estimate CCF model parameters and their uncertainty, the main used documents were: NUREG/CR-5497, NUREG/CR-6268, WCAP-15167, and WCAP-16187. Use of NUREG/CR-5497 and NUREG/CR-6268 as a source of data for CCF parameter estimating is supported by the most relevant industry and regulatory PSA guides and standards currently existing in the field, including WOG. However, the WCAP document WCAP-16187 has provided a basis for CCF parameter values specific to Westinghouse PWR plants. Many of events from NRC / INEEL database were re-classified in WCAP

  17. New iteration of decommissioning program for NPP Krsko

    International Nuclear Information System (INIS)

    Lokner, V.; Levanat, I.; Rapic, A.; Zeleznik, N.; Mele, I.; Jenko, T.

    2004-01-01

    As required by the paragraph 10 of the Agreement between the governments of Slovenia and Croatia on status and other legal issues related to investment, exploitation, and decommissioning of Nuclear power plant Krsko, Decommissioning program for Krsko NPP including LILW and spent fuel management was drafted. The Intergovernmental body required that the Program should be extensive revision of existing program as one of several iterations to be prepared before the final version. The purpose of the Program is to estimate the expenses of the future decommissioning, radioactive waste and spent fuel management for Krsko NPP. Costing estimation would be the basis for establishment of a special fund in Croatia and for adjustment of the annual rates for the existing decommissioning fund in Slovenia. The Program development was entrusted to specialized organizations both in Croatia and Slovenia, which formed the Project team as the operative body. Consulting firms from Croatia and Slovenia were involved as well as experts from the International Atomic Energy Agency (through short visits to Zagreb and Ljubljana) for specialized fields (e.g. economic aspects of decommissioning, pre-feasibility study for spent fuel repository in crystalline rock, etc.). The analysis was performed in several steps. The first step was to develop rational and feasible integral scenarios (strategies) of decommissioning and LILW and spent fuel management on the basis of detailed technical analysis and within defined boundary conditions. Based on technological data, every scenario was attributed with time distribution of expenses for all main activities. In the second step, financial analysis of the scenarios was undertaken aiming at estimation of total discounted expense and the related annuity (19 installments to the single fund, empty in 2003) for each of the scenarios. The third step involves additional analysis of the chosen scenarios aiming at their (technical or financial) improvements even at

  18. Annual and seasonal variations In the gamma activities in Sava river sediments upstream and downstream of NPP Krsko

    International Nuclear Information System (INIS)

    Stipe, Lulic

    2006-01-01

    Results of the five years monitoring of artificial and natural occurring radionuclides in the Sava river sediments are presented. Measurements were conducted as a part of the regular Krsko Nuclear Power Plant radioactivity control and the independent supervisions of the input of radionuclides into larger environment (immission). In order to estimate seasonal variations samples were taken from seven locations (one upstream and five downstream of the Krsko NPP) during four sampling period (seasonal) in each year. Selected radionuclides in the sediment fraction less than 0.5 mm were determined with gamma spectrometer equipped with BE3830 model High Purity Ge detector with 30% relative efficiency. (authors)

  19. Annual and seasonal variations In the gamma activities in Sava river sediments upstream and downstream of NPP Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Stipe, Lulic [Rudjer Boskovic Institute, Lab. for radioecology, Zagreb (Croatia)

    2006-07-01

    Results of the five years monitoring of artificial and natural occurring radionuclides in the Sava river sediments are presented. Measurements were conducted as a part of the regular Krsko Nuclear Power Plant radioactivity control and the independent supervisions of the input of radionuclides into larger environment (immission). In order to estimate seasonal variations samples were taken from seven locations (one upstream and five downstream of the Krsko NPP) during four sampling period (seasonal) in each year. Selected radionuclides in the sediment fractiess than 0.5 mm were determined with gamma spectrometer equipped with BE3830 model High Purity Ge detector with 30% relative efficiency. (authors)

  20. Development of Krsko Severe Accident Management Database (SAMD)

    International Nuclear Information System (INIS)

    Basic, I.; Kocnar, R.

    1996-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. Krsko Severe Accident Management Database documents the severe accident management activities which are developed in the NPP Krsko, based on the Krsko IPE (Individual Plant Examination) insights and Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidance). (author)

  1. Krsko Nuclear Power Plant's Environmental Management System in Compliance with ISO 14001:2004

    International Nuclear Information System (INIS)

    Kusar, A.; Kavsek, D.

    2010-01-01

    Krsko Nuclear Power Plant (NPP) pays special attention to environmental protection and practices environmental safety in all plant processes and management. In 2008, Krsko NPP introduced the Environmental Management System in compliance with ISO 14001:2004 standard. The plant management announced the Environmental policy which is a part of the business strategy of Krsko NPP which is an eco-friendly company. The Policy is a commitment of the plant management and all staff to act in compliance with requirements of ISO 14001:2004. The standard served as a basis for developing some new documentation such as Environmental Management System Quality Manual, Environmental planning procedures identifying legal and other requirements, Register of environmental aspects, Register of legal and other requirements etc. When establishing the Register of environmental aspects, all possible environmental impacts of the plant were carefully reviewed and estimated. Following the introduction and certification audit in October and December 2008 of Bureau Veritas Certification, Krsko NPP was awarded certificate ISO 14001:2004 attesting conformity of its Environmental Management System with this standard. The Environmental Certificate means that Krsko NPP will promote a positive environmental culture and maintain a safe, healthy and environmentally-sound workplace for all its employees, contractors and visitors.(author).

  2. Determination of source term for Krsko NPP extended fuel cycle

    International Nuclear Information System (INIS)

    Nemec, T.; Persic, A.; Zagar, T.; Zefran, B.

    2004-01-01

    The activity and composition of the potential radioactive releases (source term) is important in the decision making about off-site emergency measures in case of a release into environment. Power uprate of Krsko NPP during modernization in 2000 as well as changing of the fuel type and the core design have influenced the source term value. In 2003 a project of 'Jozef Stefan' Institute and Slovenian nuclear safety administration determined a plantspecific source term for new conditions of fuel type and burnup for extended fuel cycle. Calculations of activity and isotopic composition of the core have been performed with ORIGEN-ARP program. Results showed that the core activity for extended 15 months fuel cycle is slightly lower than for the 12 months cycles, mainly due to larger share of fresh fuel. (author)

  3. Criticality safety analysis of the NPP Krsko storage racks

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    2002-01-01

    NPP Krsko is going to increase the capacity of the spent fuel storage pool by replacement of the existing racks with high-density racks. This will be the second reracking campaign since 1983 when storage was increased from 180 to 828 storage locations. The pool capacity will increase from 828 to 1694 with partial reracking by the spring 2003. The installed capacity will be sufficient for the current design plant lifetime. Complete reracking of the spent fuel pool will additionally increase capacity to 2321 storage locations. The design, rack manufacturing and installation has been awarded to the Framatome ANP GmbH. Burnup credit methodology, which was approved by the Slovenian Nuclear Safety Administration in previous licensing of existing racks, will be again implemented in the licensing process with the recent methodology improvements. Specific steps of the criticality safety analysis and representative results are presented in the paper.(author)

  4. Performance of nuclear fuel in the Krsko reactor; Spremljanje delovanja jedrskega goriva v reaktorju NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Jurcevic, M; Kurincic, B; Levstek, M F; Sambo, B; Vrcko, P [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1987-07-01

    In this paper activities to follow performance of the nuclear fuel and operational status of the reactor of Nuclear Power Plant Krsko are presented. Short descriptions of the methods as well as nuclear and process instrumentation used for surveillance of the reactor performance are given. The purpose of the subject activities is to assure safe operation of the reactor in accordance with the Final safety Analysis Report of NPP Krsko. (author)

  5. Integrated use of Primavera and ORAM codes in outage 1999 at NPP Krsko

    International Nuclear Information System (INIS)

    Krajnc, J.; Skaler, F.; Basic, I.; Kocnar, R.

    1999-01-01

    The paper deals with the following postulated main goals of outage scheduling with Primavera tool at Krsko NPP: planning and controlling of resources (people, equipment, locations, sources), controlling the safety aspects of an outage and assuring defense-in-depth philosophy (through integrated safety assessment by ORAM code), diversity use of the plan during preparations period and outage progress (MCB, work leaders, management, planning Dept., subcontractors, support, etc.), allowing for optimization of outage duration. A snapshot in Primavera of what actually happened in outage 1999, lessons learned and a new work template is the scope of the next year outage.(author)

  6. Impact of power plant KRSKO on the environment

    International Nuclear Information System (INIS)

    Hak, Nena; Lulic, Stipe

    1993-01-01

    The Sava river is among the largest rivers in the Republic of Croatia. It drains 95.000 square kilometers before meeting the Danube River. The Sava river and its surroundings we being exploited in agriculture, forestry, power generation (one nuclear power plant and several thermal power plants), oil transportation, gravel extraction and recreation. At last, the Sava River is the major source of fresh water for industry and population. Different authorized institutions from the Republic of Slovenia and the Republic of Croatia are included in programs of nonradiological and radiological monitoring of Nuclear Power Plant Krsko (NPPK). Quarterly, the institutions from the Republic of Croatia, NPP Krsko and the Ministry of Energy of the Republic of Croatia, submit public information in the Republic of Croatia about NPP Krsko operation and its environmental impact

  7. External Reactor Vessel Cooling Evaluation for Severe Accident Mitigation in NPP Krsko

    International Nuclear Information System (INIS)

    Mihalina, M.; Spalj, S.; Glaser, B.

    2016-01-01

    The In-Vessel corium Retention (IVR) through the External Reactor Vessel Cooling (ERVC) is mean for maintaining the reactor vessel integrity during a severe accident, by cooling and retaining the molten material inside the reactor vessel. By doing this, significant portion of severe accident negative phenomena connected with reactor vessel failure could be avoided. In this paper, analysis of NPP Krsko applicability for IVR strategy was performed. It includes overview of performed plant related analysis with emphasis on wet cavity modification, plant's site specific walk downs, new applicable probabilistic and deterministic analysis, evaluation of new possibilities for ERVC strategy implementation regarding plant's post-Fukushima improvements and adequacy with plant's procedures for severe accident mitigation. Conclusion is that NPP Krsko could perform in-vessel core retention by applying external reactor vessel cooling strategy with reasonable confidence in success. Per probabilistic and deterministic analysis, time window for successful ERVC strategy performance for most dominating plant damage state scenarios is 2.5 hours, when onset of core damage is observed. This action should be performed early after transition to Severe Accident Management Guidance's (SAMG). For loss of all AC power scenario, containment flooding could be initiated before onset of core damage within related emergency procedure. To perform external reactor vessel cooling, reactor water storage tank gravity drain with addition of alternate water is needed to be injected into the containment. ERVC strategy will positively interfere with other severe accident strategies. There are no negative effects due to ERVC performance. New flooding level will not threaten equipment and instrumentation needed for long term SAMGs performance and eventually diluted containment sump borated water inventory will not cause return to criticality during eventual recirculation phase due to the

  8. SNSA surveillance over the ageing effects and ability for long term operation at Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Ferjancic, M.; Pavlin, D.; Lovincic, D.

    2007-01-01

    The paper presents the Slovenian Nuclear Safety Administration (SNSA) tools used for verification the adequacy of management of ageing effects and assuring suitability for long term operation at the Krsko NPP. In addition to tools commonly used as PSR (Periodic Safety Review), assessment of plant modifications, regular inspections, the SNSA applies some special methods like monitoring the condition of important plant structures, systems and components (SSC) through special designed software, review and assessment of important plant programmes and its own set of performance indicators

  9. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  10. Soundness of Krsko Nuclear Power Plant Performance in Terms of Energy and Finance

    International Nuclear Information System (INIS)

    Curkovic, A.; Vrankic, K.; Magdic, M.

    1998-01-01

    Compared to existing conventional thermal power plants in Croatian electric power system, as well as to alternative (potential) imported coal and gas fired thermal power plants, Krsko NPP (nuclear power plant) generates electricity with lower production costs. This cost margin in favour of the Krsko NPP represents the soundness of this nuclear power plant in terms of energy and finance. (author)

  11. Impact of the measurement data on the CORD-2 nuclear design calculations of the NPP Krsko

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    2004-01-01

    The CORD-2 package was developed at Jozef Stefan Institute and has been validated for the nuclear design calculations of PWR cores. It has been used for the independent verification of the NPP Krsko nuclear design for the last 6 cycles of operation. The accuracy of the package is very good fulfilling all criteria usually imposed on the design prediction of the reactor nuclear parameters. To obtain as robust package as possible and to eliminate potential systematic errors of the package, it was decided to rely on measured core power distributions. In core power measurements, which are performed each month of reactor operation, are used to obtain fuel assemblies burnup histories. Consequently, burnup distributions obtained from the power measurements of all previous cycles are taken as a starting point at the beginning of the considered cycle. Since a lot of experience has been gained with the package, it was decided to evaluate the impact of measurement data on the accuracy of the calculations. Burnup calculations of all 19 cycles of the NPP Krsko are repeated, building simultaneously the calculated library of burnup histories for all fuel assemblies. The basic reactor parameters such as HZP critical boron concentration, isothermal temperature coefficient, control rod worth and cycle length are compared to the results obtained with CORD-2 standard sequence of calculation and direct measurements.(author)

  12. Decommissioning and Waste Disposal Programme of NPP Krsko - How to Proceed in the Future

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.; Levanat, I.; Lokner, V.

    2006-01-01

    By the agreement between Slovenia and Croatia on the ownership and exploitation of the NPP Krsko, which is effective since March 2003, the decommissioning and the disposal of spent fuel and low and intermediate level waste from NPP Krsko is the responsibility of both countries. In article 10 the agreement requires that within a year after putting it into force both parties jointly prepare a decommissioning and waste disposal programme with more detailed elaboration of these issues. According to these requirements such a programme was prepared by the waste management organisations from both countries - APO from Croatia and ARAO from Slovenia - and in March 2004 submitted to the Intergovernmental Commission for adoption. Later in 2004 the document was accepted also by both Governments and in Croatia also by the Parliament. By the agreement it is also anticipated that the decommissioning and waste disposal programmes be revised at least every 5 years. Such an approach is quite common and practiced in many countries, and some countries prepare revisions even more frequently. The purpose of these new revisions is two folded: on one hand to improve the technical solutions for the decommissioning as well as for waste disposal by including new or better known data and new technological developments and experience, and on the other hand to update the cost calculation of these future nuclear liabilities. Having in mind that these cost estimations are made for the rather distant future it is extremely important that regular updating and adjustment of estimates be performed in order to meet the future needs. Although the Decommissioning and Waste Disposal Programme has just recently passed the adoption procedure and its implementation has not yet been fully achieved, the time of the next revision is approaching fast. To make good progress in the next revision serious preparations including some strategic decisions should start immediately. The programme from 2004 was prepared

  13. Intranet portal at the Krsko NPP, Slovenia

    International Nuclear Information System (INIS)

    2016-01-01

    The intranet portal (named IntraNEK) at Krsko NPP serves as a single entry point to access the internet and various plant applications and links. The front page consists of the standard internet search bar and links to various applications that can either reside within the technological computer network (TRM) or within the plant business computer network. Access to the TRM applications is read only. Some applications on the business computer network are open to all personnel who log on to the network while some applications are restricted and secured, and require additional login entries. A selected link will open in a new window. Documents will open with the appropriate software tool depending on the document file format. Some categories of documents are available in image form only (e.g. procedures, drawings etc.), while some are available in fully searchable PDF format (e.g. technical specifications, updated safety analysis reports (USARs) etc.). Plant departments (organizational units) have their own pages accessible from the front page. Their pages contain links to their own information resources or links to other resources and applications, tailored to the department needs. During recent years a number of web based applications have been developed that are connected also with a common Oracle database. Some are designed to serve for data entry and browsing while others serve for browsing only

  14. Applicability of coupled code RELAP5/GOTHIC to NPP Krsko MSLB calculation

    International Nuclear Information System (INIS)

    Keco, M.; Debrecin, N.; Grgic, D.

    2005-01-01

    Usual way to analyze Main Steam Line Break (MSLB) accident in PWR plants is to calculate core and containment responses in two separate calculations. In first calculation system code is used to address behaviour of nuclear steam supply system and containment is modelled mainly as a boundary condition. In second calculation mass and energy release data are used to perform containment analysis. Coupled code R5G realized by direct explicit coupling of system code RELAP5/MOD3.3 and containment code GOTHIC is able to perform both calculations simultaneously. In this paper R5G is applied to calculation of MSLB accident in large dry containment of NPP Krsko. Standard separate calculation is performed first and then both core and containment responses are compared against corresponding coupled code results. Two versions of GOTHIC code are used, one old ver 3.4e and the last one ver 7.2. As expected, differences between standard procedure and coupled calculations are small. The performed analyses showed that classical uncoupled approach is applicable in case of large dry containment calculation, but that new approach can bring some additional insight in understanding of the transient and that can be used as simple and reliable procedure in performing MSLB calculation without any significant calculation overhead. (author)

  15. Integrated approach to fire safety at the Krsko nuclear power plant - fire protection action plan

    International Nuclear Information System (INIS)

    Lambright, J.A.; Cerjak, J.; Spiler, J.; Ioannidi, J.

    1998-01-01

    Nuclear Power Plant Krsko (NPP Krsko) is a Westinghouse design, single-unit, 1882 Megawatt thermal (MWt), two-loop, pressurized water nuclear power plant. The fire protection program at NPP Krsko has been reviewed and reports issued recommending changes and modifications to the program, plant systems and structures. Three reports were issued, the NPP Krsko Fire Hazard Analysis (Safe Shout down Separation Analysis Report), the ICISA Analysis of Core Damage Frequency Due to Fire at the NPP Krsko and IPEEE (Individual Plant External Event Examination) related to fire risk. The Fire Hazard Analysis Report utilizes a compliance - based deterministic approach to identification of fire area hazards. This report focuses on strict compliance from the perspective of US Nuclear Regulatory Commission (USNRC), standards, guidelines and acceptance criteria and does not consider variations to comply with the intent of the regulations. The probabilistic analysis methide used in the ICISA and IPEEE report utilizes a risk based nad intent based approach in determining critical at-risk fire areas. NPP Krsko has already completed the following suggestions/recommendations from the above and OSART reports in order to comply with Appendix R: Installation of smoke detectors in the Control Room; Installation of Emergency Lighting in some plant areas and of Remote Shout down panels; Extension of Sound Power Communication System; Installation of Fire Annunciator Panel at the On-site Fire Brigade Station; Installation of Smoke Detection System in the (a) Main Control Room Panels, (b) Essential Service Water Building. (c) Component Cooling Building pump area, chiller area and HVAC area, (d) Auxiliary Building Safety pump rooms, (e) Fuel Handling room, (f) Intermediate Building AFFW area and compressor room, and (g) Tadwaste building; inclusion of Auxiliary operators in the Fire Brigade; training of Fire Brigade Members in Plant Operation (9 week course); Development of Fire Door Inspection and

  16. Radiation doses estimation for hypothetical NPP Krsko accidents without and with PCFV using RASCAL software

    International Nuclear Information System (INIS)

    Vukovic, Josip; Konjarek, Damir; Grgic, Davor

    2014-01-01

    Calculation is done using Source Term to Dose module of RASCAL (Radiological Assessment System Consequence Analysis) software to estimate projected radiation doses from a radioactive plume to the environment. Utilizing this module, it is possible to do preliminary assessment of consequences to the environment in case of adverse reactor conditions or releases from other objects containing radioactive materials before the emergency situation has happened or in the early phase. RASCAL is simple, easy to use, fast-running tool able to provide initial estimate of radiological consequences of nuclear accidents. Upon entering rather limited amount of input parameters for the Krsko NPP, mostly key plant parameters, time dependent source term calculation is executed to determine radioactive inventory release rates for different plant conditions, release paths and availability of protective measures. These rates given for each radionuclide as a function of time are used as an input to atmospheric dispersion and transport model. Together with release rates, meteorological conditions dataset serve as input to determine the behavior of the radioactive releases that is plume in the atmosphere. So as an output, RASCAL produces a 'dispersion envelope' of radionuclide concentrations in the atmosphere. These concentrations of radionuclides in the atmosphere are further used for estimating the doses to the environment and the public downwind the release point. Throughout this paper, dose assessment is performed for two distances, close-in distance and distance out to 40 km from the source, for hypothetical NPP Krsko accidents without and with Passive Containment Filtered Vent (PCFV) system used. Obvious difference is related to released radioactivity of Iodine isotopes. Results of radioactive effluents deposition in the environment are displayed via various doze parameters, radionuclide concentrations and materials exposure rates in this particular case. (authors)

  17. Limited Releases of Krsko NPP

    International Nuclear Information System (INIS)

    Breznik, B.; Kovac, A.

    2001-01-01

    Full text: Krsko Nuclear Power Plant is about 700 MW Pressurised Water Reactor plant located in Slovenia close to the border with Croatia. The authorised limit for the radioactive releases is basically set to 50 μSv effective dose per year to the members of the public. There is also additional limitation of total activities released in a year and concentration. The poster presents the effluents of the year 2000 and evaluated dose referring to the limits and to the natural and other sources of radiation around the plant. (author)

  18. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  19. On-line maintenance PSA support at NPP Krsko

    International Nuclear Information System (INIS)

    Prosen, R.; Vrbanic, I.; Kastelan, M.

    2000-01-01

    In 1997 Krsko NPP initiated the on-line maintenance (OLM) practice. On-line maintenance constitutes of corrective activities, preventive activities, surveillance activities, tests and inspections, as well as calibrations and modifications, taking place during the normal power operations. The on-line maintenance is a multidisciplinary process consisting of activity specification, planning, and preparation and performing of the OLM activity of interest. The primary role of the PSA group is to assess from the r isk perspective , using the plant-specific NEK PSA model, system unavailability and the impact to the plant operational risk. The intent is to support planning of the on-line maintenance activities from the risk perspective. The risk evaluation of the OLM activities is based on the probability of core damage evaluation for the defined discrete plant configuration states, determined by the OLM activities. Within this application, the optimized, plant-specific PSA model is used on Risk Spectrum platform. To perform the risk assessment of the on-line maintenance activities, first the systems to be affected are defined based on the planned OLM activities. The next important step is the assessment of the planned work schedule. To define the final schedule, the co-ordination and optimizing the planned OLM activities needs activation of all participating departments, supported also from PSA group. The P3 (i.e. Primavera) planning tool system windows are defined for different systems and groups of systems, and the activities are sorted in particular weeks according to these windows. (author)

  20. The impact of NPP Krsko steam generator tube plugging on minimum DNBR at nominal conditions

    International Nuclear Information System (INIS)

    Lajtman, S.

    1996-01-01

    Typically, steam generator tube plugging (SGTP) both decreases the reactor coolant system (RCS) flow rate and the heat transfer surface area of the steam generator. At a constant thermal power and vessel outlet temperature, as tube plugging increases, the vessel average temperature, vessel inlet temperature and steam generator secondary side steam pressure decrease. This paper presents the analysis of impact of SGTP on Minimum Departure from Nucleate Boiling Ratio (MDNBR) at NPP Krsko (NEK), using the Improved Thermal Design Procedure (ITDP), WRB-1 correlation, and COBRA-III-C computer code. No credit was given to high plugging percentage region power reduction resulting from turbine volumetric flow limitations. MDNBR is found to be decreasing with increasing plugging, but not under the limiting values. (author)

  1. Trends in simulation and the Krsko full scope simulator

    International Nuclear Information System (INIS)

    Boire, R.; Chatlani, M.

    1998-01-01

    The nuclear power plant simulation industry is a fast-paced industry yielding continual development as a result of innovations in technology and customer requirements. This paper will discuss the current trends in simulator requirements, the status of simulation technology and the expected future developments, particularly in the context of the NPP Krsko full scope simulator. CAE Electronics has been awarded the contract for the design, construction, integration, testing and commissioning of the NPP Krsko full scope simulator (KFSS) by Nuklearna elektrarna Krsko (NEK). KFSS, as an integral part of the NPP Krsko Modernization plan, has been the subject of an extensive procurement process. KFSS will also take into account the steam generator replacement and plant uprate projects which will be delivered to provide initial training in the modernized plant configuration. As a result, the completed KFSS will meet NEK's goals for reliable training in safe plant operation as well as the licensing requirements of the Slovenian Nuclear Safety Administration. KFSS will be a state-of-the-art facility featuring high fidelity process and control models, proven technology and superior maintainability that will push the envelope of traditional simulator uses. In addition to serving its role as a high quality training vehicle, KFSS will be used for engineering purposes including procedure development and validation, optimization of plant operation and study and validation of plant modifications. KFSS models will be built for the most part with CAE's ROSE TM toolset. ROSE, is a component-based, visual programming environment for the creation, testing, integration and management of simulator models and supporting virtual panels. The NSSS will be simulated using the ANTHEM two-phase drift flux model, while be simulated using the COMET two-group, three-dimensional model. Software design and testing will be supported by an extensive series of quality procedures throughout the software

  2. Use of MAAP code for identification of key plant vulnerabilities for the beyond design accidents and their mitigation at NPP Krsko

    International Nuclear Information System (INIS)

    Krajnc, B.

    1995-01-01

    NPP Krsko performed according to GL 88-20, Supplement 1-4 and RUJV requirement the Individual Plant Examination analyses. For the required deterministic analyses the MAAP 3.0B code was used. It was proven that such severe accident analysis can be used for evaluation of the overall level of safety improvement that can be gained with the different modifications and alternate design. In this paper one such important outcomes from these analyses will be presented. (author)

  3. NPP Krsko: LILW Repository or Long Term Storage

    International Nuclear Information System (INIS)

    Lokner, V.; Subasic, D.; Levanat, I.

    2008-01-01

    Construction of the facilities for LILW and SF management, as planned in Decommissioning and LILW and SF management program for NPP Krsko, would be a rather expensive and challenging project for such a small nuclear program. In order to accommodate waste arising from a single nuclear power plant, one LILW repository should be constructed before the end of the NPP operation, then one SF dry storage, and finally one geological repository. This requires relatively urgent identification within Slovenian/Croatian territory of three locations that meet the criteria for establishment of such facilities and are acceptable to the local communities. There are very few such potential locations. The siting process for the first of the three facilities is well under way in Slovenia, because the country wants to have its LILW repository in operation by the year 2013. In order to facilitate public acceptance, Slovenian government has introduced financial incentives to local communities for the repository construction and operation. These 'compensations for limited land use' may significantly increase the overall costs of disposal if the repository is in operation for a long period. In the recent years, however, a possibility of long term storage (LTS) is gaining an increased attention in the waste management community, and has already been introduced e.g. in the Netherlands. It is a particularly viable option for limited waste quantities. Disposal remains the final solution, but present technologies have made possible a relatively inexpensive storage up to about hundred years, which can accommodate LILW, HLW and SF from nuclear programs as well as research reactor waste and NORM. Such storage would be a safe and simple temporary solution, encompassing all immediate and near future waste management needs. In addition, it would increase flexibility and reduce financing requirements for the final waste disposal: providing additional time for reduction of radiation emission and heat

  4. Developing Effective Corrective Action Plan in Krsko NPP

    International Nuclear Information System (INIS)

    Bach, Bruno; Cizmek, Rudi; Bozin, Bojan

    2014-01-01

    Experience shows that many events could have been prevented if lessons had been learned from previous incidents. Event reporting thus has become an increasingly important aspect of the operation and regulation of all safety-related and public health industries. Different industries such as aeronautics, chemicals, transport and of course nuclear depend on Operating Experience (OE) feedback programs to provide lessons learned about safety. The information available under an OE programme for these organizations comprises internal event reports and analysis and external operating experience including reports on low level events and near misses and other relevant operating performance information. The worldwide OE programme (such as WANO OE) in nuclear power plants provides opportunity to learn from events at other plants. In particular, it alerts plants to mistakes or events that have occurred at other nuclear power plants and enables them to take corrective actions to prevent similar occurrences at their own plant. The intent of the effective and efficient OE program is therefore to improve personnel/plant safety, reliability and commercial performance of the operating nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff and to the relevant national and international organizations and corrective actions are effectively implemented. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed its own OE program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The OE is a part of the Corrective Action Program (CAP), which is among top management programs. The purpose of this article is to present a part of the Krško NPP

  5. Quality Control Activities Related to Mechanical Maintenance of Safety Related Components at Krsko NPP

    International Nuclear Information System (INIS)

    Djakovic, D.

    2016-01-01

    For successful, safe and reliable operation of nuclear power plant, maintenance processes have to be systematically controlled and procedures for quality control of maintenance activities shall be established. This is requested by the quality assurance program, which shall provide control over activities affecting the quality of structures, systems, and components, considering their importance to safety. As a part of Quality and Nuclear Oversight Division (QNOD; SKV), the Quality Control Department (QC) provides quality control activities, which are deeply involved in maintenance processes at Krsko NPP, both on safety related and non-safety related (non-nuclear safety) components. QC activities on safety related components have to fulfil all requirements, which will enable the components to perform their intended safety functions. This paper describes quality control activities related to mechanical maintenance of safety related components at Krsko NPP and significant role of the Krsko plant QC Department in three particular maintenance cases connected with safety related components. In these three specific cases, the QC has confirmed its importance in compliance with quality assurance program and presented its significant added value in providing safe and reliable operation of the plant. The first maintenance activity was installation of nozzle check valves in the scope of a modification for improving regulation of spent fuel pit pumps. The QC Department performed receipt inspection of the valves. Using non-destructive examination methods and X-ray spectrometry, it was found out that the valve diffuser was made of improper material, which could cause progressive corrosion of the valve diffuser in borated water and consequently a loss of safety function of the valves followed by long-term consequences. The second one was the receipt inspection of containment ventilation fan coolers. The coolers were claimed and sent back to the supplier because the QC Department

  6. Ideal scaling of BETHSY 9.1.B test results to NPP

    International Nuclear Information System (INIS)

    Petelin, S.; Guntel, I.

    1995-01-01

    The transient scenario standard problem 27 (ISP-27) was implemented in the RELAP5 analysis of small break loss of coolant accident for Krsko nuclear power plant (Krsko NPP). The objective was to evaluate the effectiveness of ISP-27 proposed accident management procedure for real NPP and to compare the physical phenomena known from experimental background with the phenomena predicted by RELAP5 simulation of real plant transient. The analyses showed that, if relevant break, power scaling criteria, primary and secondary pressure are fulfilled the RELAP5 model of Krsko NPP cannot completely ensure the simulation of typical thermal-hydraulic phenomena observed in BETHSY facility during ISP-27. Much better satisfaction is observed on ideal scaled up model. (author)

  7. Modeling of containment response for Krsko NPP Full Scope Simulator verification

    International Nuclear Information System (INIS)

    Kljenak, I.; Skerlavaj, A.

    2000-01-01

    Containment responses during the first 10000 s of Anticipated Transient Without Scram and Small Break Loss-of-Coolant Accident scenarios in the Krsko two-loop Westinghouse pressurized water reactor nuclear power plant were simulated with the CONTAIN computer code. Sources of coolant were obtained from simulations with the RELAP5 code. The simulations were carried out so that the results could be used for the verification of the Krsko Full Scope Simulator. (author)

  8. Krsko 2 Project Preparation and Status

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Bergant, R.; Zagar, T.

    2008-01-01

    The Government of the Republic of Slovenia has adopted a document 'Resolution on National Development Projects for the period 2007 - 2023' in October 2006. Among several projects which all support sustainable development of Slovenia, an option of a new nuclear power plant was proposed. Thus, the Slovenian Government showed obvious intention and direction of Slovenian future energetic situation. The supply of electricity has been sharpening in Slovenia in the last few years. Growing of gross domestic product (GDP) and approaching to the life standard of developed EU countries has caused increased consumption of electricity. Since domestic electricity production does not follow the increased consumption, Slovenia already imports nearly a quarter of its needed electricity. Slovenia would need 400 MW of installed electrical power now for covering of its base load needs only. Based on recent electricity consumption forecasts, Slovenia will need 800 MW of new electricity generation capacities by 2015 and 1500 MW by 2025 respectively. Besides high annual growth rate and high dependence on electricity import, a problem of relatively old power generation objects and realization of new energy and climate package for Europe exists. All together dictates our options for expansion of capacity production of the proposed Nuclear power plant Krsko 2. Experience and knowledge of light water pressurized reactor can be effectively used at NPP Krsko 2. Planned NPP Krsko 2 would have between 1100 and 1600 MW of installed electrical power. If the decision is taken in 2009, construction could start in 2013 and finish in 2017. (author)

  9. Potential need for re-definition of the highest priority recovery action in the Krsko SAG-1

    International Nuclear Information System (INIS)

    Bilic Zabric, T.; Basic, I.

    2005-01-01

    Replacement of old SG (Steam Generators) [7] and the characteristic of new ones throws the question of proper accident management strategy, which leans on philosophy that repair and recovery actions have first priority. In the current NPP Krsko SAMGs (Severe Accident Management Guidelines), water supply to the SG has priority over re-injection water into the core. NPP Krsko reconsidered the highest priority of SAG-1 (inject water to the SG), against the WOG (Westinghouse Owners Group) generic approach (inject water into the core) and potential revision of Severe Accident Phenomenology Evaluations using MAAP (Modular accident Analysis Program) 4.0.5 code. (author)

  10. Environmental Qualification Program for NPP Krsko

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Spalj, S.; Colovic, G.

    1998-01-01

    The functionality the equipment important to safety is deteriorated during its service due to ageing and harsh environment conditions. Since the environment is a potential for common cause failures, the purpose of Environmental Qualification (EQ) is to demonstrate the capability of safety-related equipment to perform its safety function in aged conditions and under extreme conditions after design bases event (DBE). EQ is one of the steps in licensing process according to US regulatory documents and standards (10CFR50.49, RG 1.89, NUREG-0588, IEEE-323). This paper presents the efforts in establishing the EQ program in the Krsko nuclear power plant. (author)

  11. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  12. Methodology and results of the seismic probabilistic safety assessment of Krsko nuclear power plant

    International Nuclear Information System (INIS)

    Vermaut, M.K.; Monette, P.; Campbell, R.D.

    1995-01-01

    A seismic IPEEE (Individual Plant Examination for External Events) was performed for the Krsko plant. The methodology adopted is the seismic PSA (Probabilistic Safety Assessment). The Krsko NPP is located on a medium to high seismicity site. The PSA study described here includes all the steps in the PSA sequence, i.e. reassessment of the site hazard, calculation of plant structures response including soil-structure interaction, seismic plant walkdowns, probabilistic seismic fragility analysis of plant structures and components, and quantification of seismic core damage frequency (CDF). Also relay chatter analysis and soil stability studies were performed. The seismic PSA described here is limited to the analysis of CDF (level I PSA). The subsequent determination and quantification of plant damage states, containment behaviour and radioactive releases to the outside (level 2 PSA) have been performed for the Krsko NPP but are not further described in this paper. The results of the seismic PSA study indicate that, with some upgrades suggested by the PSA team, the seismic induced CDF is comparable to that of most US and Western Europe NPPs. (author)

  13. RELAP5/MOD3.3 assessment against MSIV closure events in Krsko NPP

    International Nuclear Information System (INIS)

    Parzer, I.

    2002-01-01

    The paper presents RELAP5/MOD3.3 analysis of two abnormal events occurred in Krsko NPP originating from sudden closure of Main Steam Isolation Valve (MSIV). Both events occurred before the SG replacement in 2000, the first one in September 1995 and the second one in January 1997. Valuable plant data were obtained from real plant transients and the RELAP5 code assessment was performed. Recently the last frozen version RELAP5/MOD3.3 has been released, before merging with another best-estimate thermalhydraulic system code TRAC into an integrated code. It is thus of utmost importance to assess models built in RELAP5 code against real plant transients before the code merger. A full twoloop plant model, developed at Jozef Stefan Institute (JSI), has been used for the analyses. The model includes old Westinghouse D4 type steam generators (SGs) with assumed 18% Utubes plugged in both steam generators. In the first case a malfunction in the MSIV in SG-1 caused inadvertent valve closure, while in the second case the valve stem has been broken in the SG-2, which also caused sudden valve closure.(author)

  14. Intranet in Nuclear Power Plant Krsko - IntraNEK

    International Nuclear Information System (INIS)

    Kocnar, R.; Krajnc, B.; Spiler, J.

    1998-01-01

    Intranet servers enable real business functionality such as publishing information, processing data and database applications, and collaboration among employees, vendors, and customers. Across all industries, intranet is rapidly reshaping company-wide communication, productivity, and innovation - and saving significant time and money in the process. IntraNEK can provide information in a way that is immediate, cost-effective, easy to use and rich in format. First Home Page of intranet in NPP Krsko was published early 1997. Until now, we published USAR-Updated Safety Analysis Report, Flow diagrams (the most frequently used series of drawings), With normal option which inernet/intranet (prompt access to any part of USAR and Technical Specification, prompt access and zooming capabilities to flow diagrams, full text searching common/advance...) and Safety Screenings Data Base. Safety Screenings Data Base is typical example of connection of Data Base (in our case popular and well know ACCESS) and PC based WWW server. Those first applications (on a one-to-many basis) show how IntraNEK brings an immediate payback to NPP Krsko, eliminating the costs of producing, printing, and shipping necessary information and reducing bulky, easily outdated paper-based documents. USAR and drawings are published on HP-UX platform (Netscape WWW Server) and Safety Screenings Data Base is published on PC platform (Microsoft WWW Server) and show us how hardware become transparent and how intranet reduce cost in client software, regardless of their choice of hardware platform. We do believe that this new technological solution should also be used in the nuclear industry, since intranet could meet and exceed all required QA and QC standards and regulations. In the paper we are going to present the examples of future applications and we will described the necessary preconditions which have to be fulfilled before IntraNET could be used as an official tool and source of information in the design

  15. RELAP5/MOD 3.2 Analysis of the Loss of RHR System Experiment Scaled to NPP Krsko

    International Nuclear Information System (INIS)

    Bencik, V.; Bajs, T.; Prah, M.

    1998-01-01

    In the paper the RELAP5/MOD 3.2 analysis of the loss of Residual Heat Removal (RHR) system during midloop operation experiment performed at the Rig of Safety Assessment (ROSA)-IV/Large Scale Test Facility (LSTF) together with the analysis of the same test scenario scaled to NPP Krsko are presented. The experiment consisted in a loss of the RHR system at cold shutdown conditions along with a 5% cold leg break in the loop without pressurizer. The Safety Injection (SI) system was disable in the calculation. The aims of the work were to study the physical phenomena encountered under low power and low system pressure conditions while the upper part of the Reactor Coolant System (RCS) is filled with noncondensable. The impact of the bypass flow between upper plenum and downcomer inlet on transient responses was investigated. The transient was simulated for 6000 s. (author)

  16. Scenario development and evaluation for the NPP Krsko revised decommissioning program

    International Nuclear Information System (INIS)

    Levanat, I.; Lokner, V.; Subasic, D.

    2004-01-01

    In this first revision, several integrated scenarios of the NPP Krsko dismantling and waste management were developed and analyzed in order to estimate the decommissioning program (DP) costs and to propose an appropriate funding plan. Most dismantling technologies and cost estimates were derived from the original decommissioning plan adopted in 1996. The LILW disposal cost estimates, however, rely on the tunnel type facility design which was developed in Slovenia a few years ago, whereas the SF repository design for this DP was adapted from the Swedish deep disposal concept. The starting assumptions for this DP were that the LILW repository would be licensed by 2013, the NPP would be permanently shut down in 2023, and the SF repository would become available in 2030. The boundary conditions also specified that DP should first re-evaluate the SID strategy from the original plan (Strategy Immediate Dismantling with immediate SF disposal, but also with a long period of on-site decay storage for the activated components, so that it actually terminates only after 96 years), and then modify it to achieve truly prompt decommissioning in which all planned activities should be completed within about 15 years after the NPP shut-down. In addition, the option of SF export to a third country should be introduced in all DP scenarios, as a realistic alternative to SF disposal into the local repository (in Slovenia or in Croatia). And finally, dry storage of SF for some 30 years before disposal or export, in an independent installation on unspecified location, should be evaluated within the DP sensitivity analysis. After a thorough analysis of the original SID strategy, it became clear that substantial modifications would be necessary in order to meet the boundary conditions while complying with the specified design and technologies of the assumed LILW and SF disposal facilities. Therefore, a systematic procedure for development and financial evaluation of feasible scenarios was

  17. Development of Krsko Severe Accident Management Guidance (SAMG)

    International Nuclear Information System (INIS)

    Cizel, F.

    1999-01-01

    In this lecture development of severe accident management guidances for Krsko NPP are described. Author deals with the history of severe accident management and implementation of issues (validation, review of E-plan and other aspects SAMG implementation guidance). Methods of Westinghouse owners group, of Combustion Engineering owners group, of Babcock and Wilcox owners group, of the BWR owners group, as well as application of US SAMG methodology in Europe and elsewhere are reviewed

  18. Influence of the CVCS Modelling on Results of the Loss of Offsite Power (LOOP) Safety Analysis for NPP Krsko

    International Nuclear Information System (INIS)

    Bencik, V.; Bajs, T.; Debrecin, N.

    2006-01-01

    causing the American Nuclear Society (ANS) condition II to progress to the more severe condition III small break Loss of Coolant Accident (LOCA). To address the pressurizer water-solid concern for NPP Krsko RELAP5/MOD3.3 analyses of the LOOP event for best-estimate and USAR based scenarios have been performed. Different CVCS charging and letdown operation modes including the most conservative case with CVCS charging flow at maximum and letdown flow isolated were analyzed. (author)

  19. Self-Assessment at Krsko Nuclear Power Plant

    International Nuclear Information System (INIS)

    Strucic, M.; Kavsek, D.; Novak, J.; Dudas, M.

    2006-01-01

    Self-assessment program in NPP Krsko is based on plant effort to identify areas for improvements, as well as strengths in various processes. The highest level tool of that program is Inter-disciplinary Self-assessment. Extensive experience in methodology from many Peer Reviews worldwide, where NPP Krsko personnel were involved, was essential contributor for successful development and implementation of Inter-disciplinary Self-assessment. Every Inter-disciplinary Self-assessment, performed by experienced NEK people, results in highly efficient and constructive action plan. It is achieved by professional approach and positive attitude of team leader and members. Typical team composition includes members from different NEK departments including their managers. They are experienced in area being assessed, as well as in Cause analysis techniques. People involved in previous Internal or Inter-discipline Self-assessments and international peer reviews are indispensable part of the team and usually team leader is one of them. Inter-disciplinary Self-assessments are planned well in advance and are approved by NEK management board. NEK directors are also involved through sponsorship. Often, they are counterparts in the interviews sessions of assessment. Methodology of carrying out Self-assessment is developed using WANO Peer reviews experience and techniques. Areas for assessment are mostly identified through Corrective action or trending processes, Internal self-assessments or Performance Indicators. Field observations, interviews with workers in the field and their superiors are reason for frequent team meetings. That process is often iterative and results in clear and precise observation reports which are separately analyzed and at the end confirmed by owner of the process. Based on analysis described in observation reports, team defines areas where generic problems are found. Team members are dedicated for particular areas, usually where they are more educated and

  20. Revision 2 of the NPP Krsko Decommissioning Program Is Stalled

    International Nuclear Information System (INIS)

    Levanat, I.; Lokner, V.; Rapic, A.; Zeleznik, N.; Kralj, M.

    2012-01-01

    Revision 2 of the joint Slovenian-Croatian Program of NPP Krsko Decommissioning and SF andLILW Disposal was scheduled to be finished and formally approved by the end of 2009, in accordance with the bilateral Agreement on the NPP. Slightly behind the schedule, the Project team completed the entire document during spring of 2010, and in June 2010 drafted a proposal for a peer review of the Program by a dedicated IAEA expert mission. This procedure was agreed upon at the last session (May 2010) of the Intergovernmental Commission for implementation of the Agreement, when the Commission was acquainted with the five scenarios of the Revision 2 and with the estimates of their costs/financing. It was expected that the peer review would be performed soon, and that formal adoption of the Revision 2 would follow. Although in this process of approval some decisions remained to be made by the stakeholders, the Project team did select and recommend one scenario to be used for costing purposes, in order to ensure that most necessary corrections in Program financing would be timely adopted. However, the planned IAEA review was cancelled by the Advisory board, the body nominated by the Commission ''to supervise the activities and resolve the issues raised by the Project team''. By this cancellation, the process of Program revision was effectively stalled, because the Advisory board could not clearly define further course of action: differing views between the Slovenian and the Croatian part of the Advisory board appeared, in particular regarding the set of Program scenarios and regarding the appropriateness of the Revision 2 document for the IAEA review; nonetheless, the Advisory board sent to the Project team a compilation of requests to modify Revision 2 document. The Project team determined that some minor requests were easy to fulfill, but other modifications could only be carried out after changes in the boundary conditions (approved by the Commission), or changes in national

  1. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  2. NPP Krsko Severe Accident Management Guidelines Upgrade

    International Nuclear Information System (INIS)

    Mihalina, Mario; Spalj, Srdjan; Glaser, Bruno; Jalovec, Robi; Jankovic, Gordan

    2014-01-01

    Nuclear Power Plant Krsko (NEK) has decided to take steps for upgrade of safety measures to prevent severe accidents, and to improve the means to successfully mitigate their consequences. The content of the program for the NEK Safety Upgrade is consistent with the nuclear industry response to Fukushima accident, which revealed many new insights into severe accidents. Therefore, new strategies and usage of new systems and components should be integrated into current NEK Severe Accident Management Guidelines (SAMG's). SAMG's are developed to arrest the progression of a core damage accident and to limit the extent of resulting releases of fission products. NEK new SAMG's revision major changes are made due to: replacement of Electrical Recombiners by Passive Autocatalytic Recombiners (PARs) and the installation of Passive Containment Filtered Vent System (PCFV); to handle a fuel damage situation in Spent Fuel Pool (SFP) and to assess risk of core damage situation during shutdown operation. (authors)

  3. RELAP5/MOD 3.3 analysis of Reactor Coolant Pump Trip event at NPP Krsko

    International Nuclear Information System (INIS)

    Bencik, V.; Debrecin, N.; Foretic, D.

    2003-01-01

    In the paper the results of the RELAP5/MOD 3.3 analysis of the Reactor Coolant Pump (RCP) Trip event at NPP Krsko are presented. The event was initiated by an operator action aimed to prevent the RCP 2 bearing damage. The action consisted of a power reduction, that lasted for 50 minutes, followed by a reactor and a subsequent RCP 2 trip when the reactor power was reduced to 28 %. Two minutes after reactor trip, the Main Steam Isolation Valves (MSIV) were isolated and the steam dump flow was closed. On the secondary side the Steam Generator (SG) pressure rose until SG 1 Safety Valve (SV) 1 opened. The realistic RELAP5/MOD 3.3 analysis has been performed in order to model the particular plant behavior caused by operator actions. The comparison of the RELAP5/MOD 3.3 results with the measurement for the power reduction transient has shown small differences for the major parameters (nuclear power, average temperature, secondary pressure). The main trends and physical phenomena following the RCP Trip event were well reproduced in the analysis. The parameters that have the major influence on transient results have been identified. In the paper the influence of SG 1 relief and SV valves on transient results was investigated more closely. (author)

  4. Corrective action program at the Krsko NPP. Trending and analysis of minor events

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2007-01-01

    understand the factors that might be responsible for such trend and to take corrective actions prior to the escalation to a significant event. Reviewed and analyzed data based on codes trending identified common problems, potential trends and common contributors, promote a good trending program. For the effective trending program, positive adverse trends identification and corrective actions that are addressed the weaknesses that have been identified, should be specified and implemented through the corrective action program. For that purpose the appropriate coding system incorporated into Corrective Action and Operating Experience Program is established at Krsko NPP. Minor events and near misses are collected and analyzed in order to aggregate detected minor problems. The different groups of codes developed include codes for direct causes and casual factors, processes and organizations, consequences, level of significance etc. For easier trending and further analysis a different code combinations were utilized in a form of graphs. For example: organisation vs. causal factors (allows particular department to trend human performance in their own organisation), direct cause vs. time (allows trending of equipment degradation), processes vs. organisation (allows trending 501.2 of processes degradation in particular organisation) any code in question vs. time (for trend confirmation) etc. The purpose of this article is to present the coding system established at the Krsko Nuclear Power Plant and variety of ways for trending by using the system. The article deals with the codes established, organization of code system, trend codes combinations and benefit for early recognizing adverse trends of lo-level events. (author)

  5. Implementation of Industry Experience at Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Heruc, Z.; Kavsek, D.

    2002-01-01

    Being a standalone comparatively small unit NPP Krsko has adopted a business philosophy to incorporate industry experience into its daily operations. The continuos and safe operation of the unit is supported through feedback from other utilities (lessons learned) and equipment vendors and manufacturers. A permanent proactive approach in monitoring the international nuclear technology practices, standards changes and improvements, and upon feasibility review, introducing them into processes and equipment upgrades, is applied. As a member of the most important international integrations, NPP Krsko has benefited from the opportunity of sharing its experience with others (World Association of Nuclear Operators -WANO, Institute of Nuclear Power Operations - INPO, International Atomic Energy Agency - IAEA, Nuclear Operations Maintenance Information Service - NOMIS, Nuclear Maintenance Experience Exchange - NUMEX, Electric Power Research Institute - EPRI, Westinghouse Owners Group - WOG, etc.). Voluntary activities and good practices related to safety are achieved by international missions (IAEA Assessment of Safety Significant Events Team - ASSET, IAEA Operational Safety Review Team - OSART, WANO Peer Review, International Commission for Independent Safety Analysis - ICISA) and operating experience exchange programs through international organizations. These missions are promoting the highest levels of excellence in nuclear power plant operation, maintenance and support. With time, the practices described in this paper presented themselves as most contributing to safe and reliable operation of our power plant and at the same time supporting cost optimization making it a viable and reliable source of electrical energy in the more and more deregulated market. (author)

  6. Three steam generator replacement projects in 1995: Consortium Siemens Framatome is well prepared to contribute its experience to the SGR at the Krsko NPP

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S.A. joined their experience and efforts in the field of steam generators replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 2. Further projects will follow in 1996, i.e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  7. Compensations to Local Communities in the Krsko NPP Decommissioning Program

    International Nuclear Information System (INIS)

    Levanat, I.; Knapp, A.; Lokner, V.

    2010-01-01

    In Slovenia, direct financial compensations (for 'limited land use') to local communities hosting nuclear facilities were initially specified by a government Decree from 2003. In Croatia, a possibility of direct financial compensations had been indicated in the land use plan in conjunction with the prospective RW repository siting about a decade earlier, but the topic was subsequently abandoned together with the repository project. In 2004, the joint Slovenian-Croatian Decommissioning and LILW and SF management program for NPP Krsko from 2004 (the 1st revision of the joint Program) conservatively included the compensation amounts from the Slovenian Decree into the cost estimates of LILW and SF repositories, although their location was entirely unspecified ('in Slovenia or in Croatia'). Shortly before the 2nd revision of the joint Program started in the fall of 2008, the Slovenian government had amended its Decree, practically doubling the amounts of the repository compensations. Assuming that some (or possibly all) nuclear facilities and waste, dealt with in the Program, may be located in Slovenia, the revision has adopted a conservative approach to include all compensations to local communities that may be required by the Slovenian regulations into the Program costs. This paper discusses the Slovenian government Decree, its impact on the joint Program costs, and its implications on RW and SF management in the region. The Decree suffers from the lack of self-consistency, clarity, and consistency with the more general legal provisions on which it should have been based, but it may have an important supporting role in the process of RW and SF management facilities siting. The Decree introduced significant additional costs into the joint Program, which have grown from about one hundred million eur in the 1st revision to about half a billion in this revision (depending on the Program scenario). Besides, application of the Decree in the joint Program has set a precedent

  8. Tritium in organic matter around Krsko Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kristof, Romana; Zorko, Benjamin; Kozar Logar, Jasmina; Kosenina, Suzana

    2017-01-01

    The aim of the research was to obtain first results of tritium in the organic matter of environmental samples in the vicinity of Krsko NPP. The emphasis was on the layout of suitable sampling network of crops and fruits in nearby agricultural area. Method for determination of tritium in organic matter in the form of Tissue Free Water Tritium (TFWT) and Organically Bound Tritium (OBT) has been implemented. Capabilities of the methods were tested on real environmental samples and its findings were compared to modeled activities of tritium from atmospheric releases and literature based results of TFWT and OBT. (author)

  9. Strengthening ALARA approach in work management at Krsko NPP

    International Nuclear Information System (INIS)

    Breznik, B.; Kovac, Z.; Sirola, P.

    1999-01-01

    As Low As Reasonably Achievable (ALARA) occupational exposures at nuclear power plants should be included in work management as a concept. There are world-wide trends required by the utilities for improved design, operation and maintenance. Within the period of seventeen years of plant operation maintaining low radiation exposures requires additional efforts. The benefit of this effort should be reducing risks to nuclear workers, better work planning and performance. The Krsko Plant ALARA organisations has been revised recently and built on different levels of the hierarchy. The goal is to promote good industry practice and the management of work on primary systems. The established ALARA programme describes the objectives and defines the procedures and tools for its implementation. Brief presentation of the programme as well as organisational responsibilities of dedicated ALARA committee and working groups is the scope of this paper. The management tools and ALARA indicators are discussed to implement the programme and to evaluate the results.(author)

  10. NPP life management program - status report for Slovenia

    International Nuclear Information System (INIS)

    Glumac, B.

    1998-01-01

    Status report on NPP life management in Slovenia is dealing with possible life extension of NPP Krsko which comprises: replacement of steam generator; power upgrade; exchange of plant process computer; snubber reduction program, additional forced ventilation cooling system. Fuel improvements are predicted as well as the problems of storing spent fuel, low and intermediate waste if the plant is to operate through 2023 and possibly beyond that date. Related research activities are concerned with radiation damage, modelling of reactor core parameters by Monte Carlo calculations and PSA and severe accidents studies. Most of the activities are performed in cooperation with foreign organisations

  11. Short-term and long-term strategies for NPP KRSKO radwaste management

    International Nuclear Information System (INIS)

    Fink, K.; Tankosic, D.; Feizullahi, F.

    1990-01-01

    All radioactive waste generated by the Nuklearna Elektrana Krsko (NEK) has been stored in a temporary storage building located at the site. In 1987, the plant owner embarked upon a program to develop and operate a low-level repository for permanent disposal of NEK waste by 1992. However, due to institutional and political considerations the schedule for the repository program has been substantially delayed. As a result, the plant owner has developed new strategies for the plant systems modifications as needed to cope with the shortage of the much needed storage and disposal space. This paper contains a presentation of these strategies and summarized the process which was used to develop them. 2 figs

  12. Trends of degradation in steam generator tubes of Krsko NPP before the last planned inspection

    International Nuclear Information System (INIS)

    Cizelj, L.; Dvorsek, T.; Androjna, F.

    1998-01-01

    Full-length inspection of all active tubes in both Krsko steam generators resulted in a huge amount of inspection records. A computerized database was developed by Reactor Engineering division to accelerate the management of about 200.000 records. The database was designed to support the development and decision related to the plugging criteria for damaged tubes and is utilized to gain as much experience concerning the degradation of SG tube as possible. In this paper, two prevailing group of data are statistically analyzed: the axial cracks in expansion transitions at the top of tube sheet (TTS) and Outside Diameter Stress Corrosion Cracking at tube support plates (TSP). Especially ODSCC caused a vast majority of repaired tubes (e.g., plugs and sleeves). The influence of plant startups involving oxidizing transient on the repair rates of tubes affected by ODSCC is analyzed in some detail. The results are promising and show excellent correlation in SG 2 and reasonable fit in SG 1. Predictions of maximum expected number of tubes repaired due to ODSCC at the last planned inspection is given as 67 in SG 1 and 400 in SG 2. (author)

  13. NPA applications development in the nuclear safety authority framework

    International Nuclear Information System (INIS)

    Maselj, A.; Vojnovic, D.; Gregonc, M.

    1999-01-01

    Due to the present tasks of the SNSA (Slovenian Nuclear Safety Administration) there was a need to gain a tool for analysing the transients of the Krsko Nuclear Power Plant at the SNSA. Combining the RELAP5 code with graphical interface NPA (Nuclear Plant Analyzer), the SNSA management saw an opportunity to have a powerful instrument for analyses and assessments on a user friendly basis and without high costs. The Krsko NPP Analyzer is a joint project of the SNSA and the operator, the Krsko NPP. The RELAP5/Mod2.5 input deck was constructed by the Krsko NPP's experts and their subcontractors. In 1996 the work started with translation of input model from RELAP5/Mod2.5 version to Mod3.2. This was done by Tractebel which combined NPA masks with translated input deck and constructed new dynamic function and interactive commands between graphical MMI (Man Machine Interface) and simulation code. Since Tractebel performed similar activities for the Belgian plants, their experience was used through a transfer of knowledge to the SNSA. After this phase of the project, a user of the NPP Analyzer can run accidents as SBLOCA, Main Steam Line Break, Feed Water Break, SGTR, and many other transients activating and combining interactive commands, starting from a full power operation. This project has not been finished yet. Improvements of the input deck should be done. The Critical Safety Function window will be created. The analyzer will be a helpful tool during the training program for Accident Assessment Group, which will give to the experts basic knowledge of plant operation, its systems, and physical phenomena during a steady state and transients or accidents. Also a new dimension is added to the existing safety evaluations at the SNSA to confirm the requested level of nuclear safety at the Krsko NPP. (author)

  14. Emergency preparedness exercise ''Posavje 82'' in support of the Krsko Nuclear Power Plant, Krsko, Yugoslavia

    International Nuclear Information System (INIS)

    Collins, H.E.; Emmerson, B.W.

    1983-06-01

    In October 1982, the Yugoslavian Government requested the Agency's assistance in observing and evaluating an emergency preparedness exercise (code named ''POSAVJE 82'') on 5 and 6 November 1982, to test emergency plans and arrangements supportive of the KRSKO Nuclear Power Plant. The Krsko Nuclear Power Plant is a single unit pressurized water reactor of United States (Westinghouse) design rated at 664 MWe (Gross) and is located at Krsko, Socialist Republic of Slovenia, Yugoslavia. This assistance was provided by sending a Special Assistance Mission team of experts under the general provisions of the Agency's circular letter SC/651-3 of 7 April 1981 to Member States which offered such assistance upon request. This mission was a follow-up to a previous mission requested by the Yugoslavian Government which was conducted 24 June - 1 July 1981. At that time, the mission consisted of examining the then existing arrangements for emergency planning in support of the KRSKO Nuclear Power Plant at the National, Republic, local and nuclear power plant levels and discussing with Yugoslavian authorities criteria for emergency plan development and improvement. As a result of this 1981 mission, a ''Report to the Goverment of Yugoslavia'' (IAEA TA Report 1827 of 17 September 1981) was transmitted to the Yugoslavian Government. This report set forth a number of recommendations for improving and further developing the various emergency plans and arrangements for the KRSKO Nuclear Power Plant. A summary of the major recommendations contained in the report is given in Section 2.2. The entire report is listed as Reference 1 of Annex A

  15. Operational and safety status of Krsko NPP

    International Nuclear Information System (INIS)

    Sirola, P.; Kavsek, D.

    1998-01-01

    Nuclear Power Plants Krsko (NEK) is producing electricity with the high level of reliability, safety and at acceptable price for 17 years. Energy is shared between both Slovenian and Croatian grid. The specifics of sharing the initial investment costs, later covering the operations costs and energy supply between Croatia and Slovenia is causing specific decision making problems about energy cost and future investments, however not influencing the plant safety, by now. NEK is continuously following the international nuclear technology practices, standards' changes and improvements and introducing them into the processes and equipment upgrades. As the member of the most important international integration, NEK is having the possibility of sharing its experience with others. Slovenian Energy Consumption and Supply Strategy is recognizing the NEK as a long term supply of energy in Slovenia being a strong decision making base for the future. According to the above mentioned Slovenian Energy Consumption and Supply Strategy the plant is obliged to keep all the radioactive waste, produced during the plant life, on site. The extensive efforts are taking place to reduce the radioactive waste production and save the area available for temporary waste deposition. The plant is licensed for the period of 40 years of commercial operation which started in 1983, so the Life Time Management is getting more and more important, including the performance tracing of the essential components, their maintenance and surveillance programs and also replacement plans of critical equipment. The major problems the NEK is confronted with at the moment are the Steam Generators which are reaching their and of life, and a very limited radioactive waste storage area. They are excerting influence on the plant availability and operations and maintenance costs. At the moment the process of Modernization is in progress, covering the Steam Generators replacement and a Plant Specific Simulators supply

  16. Modernization of the Nuclear Power Plant Krsko with new steam generators

    International Nuclear Information System (INIS)

    Holz, R.; Stach, U.; Gloaguen, C.

    2000-01-01

    The contract for the replacement of two steam generators at NPP Krsko was awarded in February 1998 to the Consortium SIEMENS AG FRAMATOME S.A.. The time frame for the replacement outage was scheduled from April to June 2000. The replacement itself started with the plant shut down on 15 th of April 2000 and the plant was back on line on 15 th of June, so that after an intensive engineering period of more than two years the plant was off line only 62 days, as scheduled. This document deals with the various aspects of the replacement phase itself and the techniques used. During the last years conference the engineering and licensing phase of the project have been presented. (author)

  17. Modernization of the Nuclear Power Plant Krsko with new steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Holz, R; Stach, U [Siemens AG, Erlangen, Offenbach (Germany); Gloaguen, C [Framatome, Paris (France)

    2000-07-01

    The contract for the replacement of two steam generators at NPP Krsko was awarded in February 1998 to the Consortium SIEMENS AG FRAMATOME S.A.. The time frame for the replacement outage was scheduled from April to June 2000. The replacement itself started with the plant shut down on 15{sup th} of April 2000 and the plant was back on line on 15{sup th} of June, so that after an intensive engineering period of more than two years the plant was off line only 62 days, as scheduled. This document deals with the various aspects of the replacement phase itself and the techniques used. During the last years conference the engineering and licensing phase of the project have been presented. (author)

  18. NPP Krsko periodic safety review. Safety assessment and analyses

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Thaulez, F.

    2002-01-01

    Definition of a PSR (Periodic Safety Review) project is a comprehensive safety review of a plant after ten years of operation. The objective is a verification by means of a comprehensive review using current methods that the plant remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. The overall goals of the NEK PSR Program are defined in compliance with the basic role of a PSR and the current practice typical for most of the countries in EU. This practice is described in the related guides and good practice documents issued by international organizations. The overall goals of the NEK PSR are formulated as follows: to demonstrate that the plant is as safe as originally intended; to evaluate the actual plant status with respect to aging and wear-out identifying any structures, systems or components that could limit the life of the plant in the foreseeable future, and to identify appropriate corrective actions, where needed; to compare current level of safety in the light of modern standards and knowledge, and to identify where improvements would be beneficial for minimizing deviations at justifiable costs. The Krsko PSR will address the following safety factors: Operational Experience, Safety Assessment, EQ and Aging Management, Safety Culture, Emergency Planning, Environmental Impact and Radioactive Waste.(author)

  19. RELAP5 Low Temperature Overpressurization Analysis for NPP Krsko

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.; Bajs, T.

    2000-01-01

    NEK has expressed interest in the acceptability of removing the autoclosure interlock (ACI) on the Residual Heat Removal System (RHRS) suction/isolation valves. This interest is in response to growing concerns about the loss of residual heat removal capability during cold shutdown and refueling operations. This article describes effort done to justify removal of the ACI in the light of low temperature overpressure protection of Reactor Coolant System (RCS) and RHRS and interfacing system LOCA potential. The intent of this article is to review the NEK RHRS relief valves sizing design basis and verify if the relief valves provide RHRS overpressure protection for the events possible at cold shutdown. Inadvertent isolation of RHRS during hot and cold shutdown (with reactor coolant system closed and temperatures below 177o Code 4 and5) presents one of the major safety concerns in this mode of operation. Detailed RELAP5 model of NPP Kriko following steam generator (SG) replacement and core uprate has been used in the frame of this analysis verification of RHRS relief valves sizing. The following limiting cases for cold shutdown with RCS solid conditions have been analyzed: - ransients that affect the system input/output mass balance, - ransients that affect the heat input/removal balance. (author)

  20. Presentation of common cause failures in fault tree structure of Krsko PSA : an historical overview

    International Nuclear Information System (INIS)

    Vrbanic, I.; Kosutic, I.; Vukovic, I.; Simic, Z.

    2003-01-01

    Failure of multiple components due to a common cause represents one of the most important issues in evaluation of system reliability or unavailability. The frequency of such events has relatively low expectancy, when compared to random failures, which affect individual components. However, in many cases the consequence is a direct loss of safety system or mitigative safety function. For this reason, the modeling of a common cause failure (CCF) and its presentation in fault tree structure is of the uttermost importance in probabilistic safety analyses (PSA). During the past decade, PSA model of Krsko NPP has undergone many small changes and a couple of major ones in fulfilling its basic purpose, which was serving as a tool for providing an appropriate information on the risk associated with actual plant design and operation. All changes to Krsko PSA model were undertaken in order to make it a better tool and / or to make it represent the plant in more accurate manner. The paper provides an overview of changes in CCF modeling in the fault tree structure from the initial PSA model development till present. (author)

  1. Long Term Management of Spent Fuel from NEK

    International Nuclear Information System (INIS)

    Kegel, L.; Zeleznik, N.; Lokner, V.

    2012-01-01

    In 2008 Slovenian national agency for radioactive waste management ARAO started together with Croatian sister organization APO elaboration of a new revision of Decommissioning, Radioactive waste and Spent fuel management program for NPP Krsko. In scope of this work also new studies for spent fuel storage and disposal were prepared in which technical solutions were analyzed and proposed for specific spent fuel (SF) from NPP Krsko. Time schedules for main activities of SF disposal development were elaborated for two alternative scenarios which correspond to normal NPP Krsko operation and 20 - year lifetime extension. All technical activities were financially assessed and costs estimates of SF storage and geological disposal development provided. The prepared studies were verified by international experts in order to confirm the correctness of technical inputs, proposed solutions, time schedules of activities and costs evaluations. The calculated nominal and discounted costs of spent fuel management served for the recalculation of annuities in the integral scenarios of interrelated activities on NPP Krsko decommissioning, LILW and SF management. Besides new first proposal of long-term management of spent fuel from NPP Krsko the joint work also opened additional questions. One of this is time schedule of proposed activities for long term SF management - what were the criteria used in the determination of actions and are they optimal for both countries. How the process of site selection for SF storage or disposal should be prepared having in mind that it will bring many questions in both countries? Is direct disposal of SF still the best solution in current development of nuclear prospects? The paper will present the current development and solutions for SF management from NPP Krsko and will try to answer questions which need to be solved and future development in the SF management.(author).

  2. The profile of quantitative risk indicators in Krsko NPP

    International Nuclear Information System (INIS)

    Vrbanic, I.; Basic, I.; Bilic-Zabric, T.; Spiler, J.

    2004-01-01

    During the past decade strong initiative was observed which was aimed at incorporating information on risk into various aspects of operation of nuclear power plants. The initiative was observable in activities carried out by regulators as well as utilities and industry. It resulted in establishing the process, or procedure, which is often referred to as integrated decision making or risk informed decision making. In this process, engineering analyses and evaluations that are usually termed traditional and that rely on considerations of safety margins and defense in depth are supplemented by quantitative indicators of risk. Throughout the process, the plant risk was most commonly expressed in terms of likelihood of events involving damage to the reactor core and events with radiological releases to the environment. These became two commonly used quantitative indicators or metrics of plant risk (or, reciprocally, plant safety). They were evaluated for their magnitude (e.g. the expected number of events per specified time interval), as well as their profile (e.g. the types of contributing events). The information for quantitative risk indicators (to be used in risk informing process) is obtained from plant's probabilistic safety analyses or analyses of hazards. It is dependable on issues such as availability of input data or quality of model or analysis. Nuclear power plant Krsko has recently performed Periodic Safety Review, which was a good opportunity to evaluate and integrate the plant specific information on quantitative plant risk indicators and their profile. The paper discusses some aspects of quantitative plant risk profile and its perception.(author)

  3. Future needs in radiation protection training for NPP workers of Slovenia

    International Nuclear Information System (INIS)

    Kozelj, M.; Bogovic, T.

    1999-01-01

    Short review of history of radiation protection training for NPP workers in Slovenia and legal requirements regarding this field are presented. Courses developed in co-operation between Milan Copic Nuclear Training Centre and Krsko Nuclear Power Plant are briefly described and their implementation presented. Using available data we have predicted probable number of courses and participants in forthcoming years. Some results from inquiry on courses for regularly exposed workers are presented, enabling us to modify courses according to participants' needs.(author)

  4. New low pressure (LP) turbines for NE Krsko

    International Nuclear Information System (INIS)

    Nemcic, K.; Novsak, M.

    2004-01-01

    During the evaluation of possible future maintenance strategies on steam turbine in very short period of time, engineering decision was made by NE Krsko in agreement with Owners to replace the existing two Low Pressure (LP) Turbines with new upgrading LP Turbines. This decision is presented with review of the various steam turbine problems as: SCC on turbine discs; blades cracking; erosion-corrosion with comparison of various maintenance options and efforts undertaken by the NE Krsko to improve performance of the original low pressure turbines. This paper presents the NEK approach to solve the possible future problems with steam turbine operation in NE Krsko as pro-active engineering and maintenance activities on the steam turbine. This paper also presents improvements involving retrofits, confined to the main steam turbine path, with major differences between original and new LP Turbines as beneficial replacement because of turbine MWe upgrading and return capital expenditures.(author)

  5. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  6. Analysis of inadvertent containment spray actuation for NPP Krsko

    International Nuclear Information System (INIS)

    Grgic, D.; Spalj, S.; Fancev, T.

    2000-01-01

    Refueling Water Storage Tank (RWST) supplies borated water to the Chemical and Volume Control System, Emergency Core Cooling System and Containment Spray System. In the analyses of the containment external pressure the spray temperature is assumed to be equal to the RWST lower temperature limit. This value ensures that the design negative containment pressure will not be exceeded in the event of inadvertent actuation of the Containment Spray. For NPP Kriko the negative containment pressure has to be kept below 0.1 kp/cm2 to avoid the loss of containment integrity. This paper pursuents the analysis of Inadvertent Containment Spray Actuation in order to check the influence of change in RWST water temperature on containment negative pressure. GOTHIC computer code was used for calculation of containment thermal hydraulic behavior during this accident. (author)

  7. Report on nuclear energy in SR Slovenia

    International Nuclear Information System (INIS)

    1987-01-01

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1987.

  8. Nuclear safety activities in the SR of Slovenia in 1986

    Energy Technology Data Exchange (ETDEWEB)

    Susnik, J [Inst. Jozef Stefan, Ljubljana (Slovenia)

    1987-06-15

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1986. (author)

  9. Report on nuclear energy in SR Slovenia; Porocilo o uporabi jedrske energije v SR Sloveniji

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-07-01

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1987.

  10. Nuclear safety activities in the SR of Slovenia in 1986

    International Nuclear Information System (INIS)

    Susnik, J.

    1987-06-01

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1986. (author)

  11. Report on nuclear safety on the operation of nuclear facilities in 1989

    International Nuclear Information System (INIS)

    Gregoric, M.; Levstek, M. F.; Horvat, D.; Kocuvan, M.; Cresnar, N.

    1990-01-01

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1989.

  12. Report on nuclear safety on the operation of nuclear facilities in 1990

    International Nuclear Information System (INIS)

    Gregoric, M.; Grlicarev, I.; Horvat, D.; Levstek, M.F.; Lukacs, E.; Kocuvan, M.; Skraban, A.

    1991-06-01

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1990.

  13. Dose trend analysis of the PWR nuclear power plants

    International Nuclear Information System (INIS)

    Cernilogar Radez, M.; Janzekovic, H.; Krizman, M.

    2002-01-01

    The analyses of occupational dose trends in Krsko NPP in the period from 1995 to 2001 are given in comparison to the worldwide data. The Central Dose Register of Workers in Nuclear Installations at the Slovenian Nuclear Safety Administration enables the comprehensive dose trend analysis of the occupational doses in Krsko NPP. The time dose trend of the collective annual effective dose at the Krsko NPP shows somehow different trend than the trends of the ISOE data [1]. The performance indicators describing dose data distributions related to the radiation protection standards [2, 3] are discussed.(author)

  14. Report on nuclear safety on the operation of nuclear facilities in 1989; Porocilo o jedrski varnosti pri obratovanju jedrskih objektov v letu 1989

    Energy Technology Data Exchange (ETDEWEB)

    Gregoric, M; Levstek, M F; Horvat, D; Kocuvan, M; Cresnar, N [Slovenian Nuclear Safety Administration, Ljubljana (Slovenia)

    1990-07-01

    Currently Yugoslavia has one 632 MWe nuclear power plant (NPP) of PWR design, located at Krsko in the Socialist Republic (SR) of Slovenia. Krsko NPP, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in the SR of Slovenia are mostly related to upgrading the safety of our Krsko NPP and to developing capabilities for use in future units. This report presents the nuclear safety related legislation and organization of the corresponding regulatory body, and the activities related to nuclear safety of the participating organizations in the SR of Slovenia in 1989.

  15. 3D model of steam generator of nuclear power plant Krsko

    International Nuclear Information System (INIS)

    Ravnikar, I.; Petelin, S.

    1995-01-01

    The Westinghouse Electric Corporation D4 steam generator design was analyzed from a thermal-hydraulic point of view using the 3D PHOENICS computer code. Void fraction, velocity and enthalpy distributions were obtained in the U-tube riser. The boundary conditions of primary side were provided by SMUP 1D code. The calculations were carried out for present operating conditions of nuclear power plant Krsko. (author)

  16. Radiation protection programme at Krsko nuclear power plant

    International Nuclear Information System (INIS)

    Breznik, B.

    1996-01-01

    Krsko NPP, a Westinghouse two-loop PWR of 632 M We power, is in commercial operation since 1982. Reduction of radioactive releases to the environment and the reduction of doses to workers is the basic goal in the plant radiological protection. The radiation protection programme is established to ensure that the radiation exposures to workers and members of the public are minimized according to the As Low As Reasonably Achievable approach and controlled in accordance with international safety standards and Slovenian regulations. The basis for the operational and technical measures has been provided according to the industrial good practice. The effluent control is based on the Standard Radioactive Effluent Technical Specifications, and environmental surveillance is established according to the programme defined by the regulations. The dose constraints and performance indicators are used to assure the effectiveness of the radiation protection programme and provide a convenient follow-up tool. The monitoring programme results of each year show that there is no measurable dose to the public due to radioactive releases. The commitment to the dose burden of any member of a critical group is assessed to be below the dose constraint. Individual and collective doses of the workers are within a range typical for the PWRs of a similar type. (author)

  17. Nuclear safety activities in SR Slovenia in 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Currently Yugoslavia has one 632 MWe nuclear power plant of PWR design, located at Krsko in the Socialist Republic of Slovenia. NPP Krsko, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in SR Slovenia are mostly related to upgrading the safety of our NPP Krsko and to develop capabilities to be used for the future units. This report presents safety related organizations in SR Slovenia and their activities performed in 1985. (author)

  18. Nuclear safety activities in SR Slovenia in 1985

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-09-15

    Currently Yugoslavia has one 632 MWe nuclear power plant of PWR design, located at Krsko in the Socialist Republic of Slovenia. NPP Krsko, which is a two-loop plant, started power operation in 1981. In general, reactor safety activities in SR Slovenia are mostly related to upgrading the safety of our NPP Krsko and to develop capabilities to be used for the future units. This report presents safety related organizations in SR Slovenia and their activities performed in 1985. (author)

  19. Application of computer code ALMOD 3W2 in nonsymmetric transient analysis in the primary loop of nuclear power plant; Primjena programa ALMOD 3W2 u analizi nesimetricnih prijelaznih pojava u primarnom krugu nuklearne elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Bencik, V [Elektrotehnicki institut ' rade Koncar' , Zagreb (Yugoslavia); Debrecin, N; Feretic, D; Kozaric, M [Elektrotehnicki fakultet, Zagreb (Yugoslavia)

    1988-07-01

    In this paper the method to calculate the nonsymetric transients in the nuclear power plant is presented. ALMOD 3W2 computer code with steam generator model GEVAP is applied to analyze partial loss of forced reactor coolant flow for NPP Krsko. (author)

  20. The simulator Neck-Mfgs and its training status

    International Nuclear Information System (INIS)

    Setnikar, T.; Pribozic, F.; Srebotnjak, E.; Gortnar, O.; Kovacic, J.; Stritar, A.

    1998-01-01

    This paper presents the status and training possibilities on Krsko NPP Multi-Functional Simulator (NEK-MFS). Since spring 1997 it serves as a training facility in Nuclear Training Center. During first year of operation the simulator NEK-MFS was found to be a very useful Krsko NPP specific tool which is capable to support both the initial operator training program and licensed operator retraining activities.(author)

  1. Radioactivity monitoring programme of Krsko nuclear power plant

    International Nuclear Information System (INIS)

    Miklavzic, U.; Martincic, R.; Kanduc, M.; Lulic, S.; Kovac, J.; Breznik, B.

    1996-01-01

    As a successor to the preoperational surveillance programme, the regular offsite radioactivity monitoring programme (RMP) of the Krsko Nuclear Power Plant (NPP) was implemented in 1982, when the power plant formally commenced operating. Observations collected during the first years of its operation were later also the basis for setting up the official 'Regulatory guide on monitoring of nuclear installations', issued not earlier than in 1986. The basic criterion which governed the selection of measuring methods, sampling techniques and locations, was the extent to which the data obtained could serve for the realistic assessment of the committed dose to a member of the population, and later on to members of a representative (critical) group. To be able to differentiate the radioactivity released through the liquid and gaseous effluents of the NPP from other radiation sources (natural radioactivity, global contamination), and especially because of the varying radiotoxicity of different radionuclides, in principle monitoring in the environment, as at the source, had to provide activity data for each individual radionuclide appearing in the effluents. Therefore, as early as 1982 the programme attributed the main weight to high resolution gamma spectrometry, combined with specific radiochemical analytical methods (e.g. 90 Sr/ 89 Sr, 3 H, 14 C, alpha spectrometry of Pu isotopes) which together made feasible determination of individual specific activities of the most significant man-made and natural radionuclides. By weighting the specific activities of the radionuclides identified and measured in the media surveyed by dose factors for intake, the quantity 'B' - the so-called 'radiological burden', was calculated and introduced in the yearly-summary tables. Expressed in relative units, from which the committed dose could be readily calculated, the burden B very lucidly disclosed the relative importance of different artificial pollutants and natural radioactivity present in

  2. Turbine Control System Replacement at NPP NEK; System Specifics, Project Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Mandic, D.; Zilavy, M. J.

    2010-01-01

    The main intention of this paper is to present feedback from the implementation of the new Turbine Control System (TCS) replacement project at Nuclear Power Plant (NPP) NEK - Krsko. From the plant construction time and the first plant start-up in 1981, the NPP NEK TG (Turbine-Generator) set was controlled and monitored by DEH (Digital Electro Hydraulic) Mod II Control System designed in 70's based on P2500 CPU and number of I/O controllers and modules. The P2500 CPU and associated controllers were built with discrete TTL components (TTL logic chips) and the P2500 CPU had 64k of 16 bit words of ferrite core memory. For that time, DEH Mod II had sophisticated MCR (Main Control Room) HMI (Human Machine Interface) based on digital functional keyboards, one alphanumeric black and white CRT monitor and printer. After twenty eight years of operation and because of several other reasons that are explained in the paper, NEK decided to replace the old DEH Mod II Control system with the new Emerson Ovation based DCS (Distributed Control System) on redundant platform for the control and monitoring of secondary plant systems in the NPP Krsko (NEK), and the new system was named PDEH (Programmable Digital Electro Hydraulic) TCS. In May 2007, NEK signed the turn-key contract with Westinghouse Electric Company (WEC) for the project of replacement of the TCS, Turbine Emergency Trip System (ETS), Moisture Separator Reheater (MSR) control and some other control and monitoring functions. WEC subcontracted a number of other companies for equipment delivery, AE (Architect Engineering Design) activities, specific software development tasks (changes of KFSS - Krsko Full Scope Simulator and PIS - Process Information System interface) and field installation activities. The subject project enveloped implementation of PDEH system on three application platforms: BG KFSS (Background KFSS), FG KFSS (Foreground KFSS) and PDEH system installed in the plant. The HMI for the BG KFSS platform

  3. Role of Nuclear Energy in the Energy Strategy of Slovenia

    International Nuclear Information System (INIS)

    Novak, I.

    1998-01-01

    Krsko nuclear power plant is jointly owned by Croatia and Slovenia and is one of the pillars of Slovenian power system. The utility supplies more than 20% of Slovenian electricity demand. In 16 years of its operation, Krsko NPP showed very high standards of safety and operational availability. It operates under auspices of Slovenian Nuclear Safety Authority and fully complies to national legal frame and international standards, and requirements. In 2000 the nuclear power plant will undergo a major refurbishment, replacement of steam generators and additionally the utility will be equipped with a new full scope simulator. Slovenia set up a fund to collect money for decommissioning of the Krsko NPP. (author)

  4. Integration of the Ovation Based Distributed Turbine Control System into the Existing Process Information System and Full Scope Simulator at NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.

    2010-01-01

    Programmable Digital Electro Hydraulic System (PDEH) is Turbine Control System (TCS), built on Emerson OVATION Distributed Control System (DCS) platform and installed by the Westinghouse Electric Company at the Krsko Nuclear Power Plant as the replacement for the DEH Mod II turbine control system. Core of the PDEH system consist of three pairs of redundant controllers (ETS, OA/OPC and ATC/MSR) configured for the Turbine Generator (TG) set protection, control and monitoring functions. Existing serial data link between replaced DEH Mod II and Process Information System (PIS) was removed and replaced with redundant bi-directional Ethernet TCP/IP data link via two Data Link servers in client-server architecture configuration. All hardwired signals and some of the important calculated signals are being transferred from PDEH to PIS. Main purpose of PIS data link is trending utilization at the existing PIS workstations with pre-configured trend groups and centralized data archiving. Most of the PDEH display screens (mimics) were also replicated on the PIS platform, so that TG set monitoring and operation overview can be performed over the PIS network as well as over the Process Computer Network (PCN) with PMSNT-view utility. The simulator is implemented using a stimulated Windows based Ovation platform and a SGI IRIX based Plant Model Computer (PMC) using the L-3 MAPPS simulation software platform. Two PDEH stimulated systems are installed at the Krsko Full Scope Simulator (KFSS), one for foreground and another for background simulation. Stimulated PDEH hardware is essentially identical to that installed in the plant with the exception of hardware redundancy, isolation features and interface with physical plant I/O. The Ovation control logic sheets are executed with virtual controllers hosted on a simulator specific Virtual Controller Host (VCH) Workstation. The data interface between the simulator Ovation system and the PMC is accomplished through the Ethernet

  5. Determining the boron concentration during long-term cooling of the reactor core after large loss of coolant accident; Dolocenje koncentracij bora pri dolgotrajnoem hladjenju sredice po veliki izlivni nezgodi

    Energy Technology Data Exchange (ETDEWEB)

    Mavko, B; Ravnki, M [Institut Jozef Stefan, Ljubljana (Yugoslavia)

    1988-07-01

    Critical boron concentration before and after postulated loss of coolant accident with long-term cooling recirculation was calculated for cycle 6 of Krsko NPP. The limiting boron concentration curve of containment sump was calculated for equilibrium conditions. The results were analysed and showed that the boron concentration in refueling water storage tank and in safety injection accumulators should be increased from 2000 to 2100 ppm in 6th cycle. In the consequence corresponding chapters of the NPP Krsko technical Specifications were changed as well. (author)

  6. FUMACS-G, a Graphical User Interface for FUMACS Code Package

    International Nuclear Information System (INIS)

    Trontl, K.; Gergeta, K.; Smuc, T.

    2002-01-01

    The FUMACS (FUel MAnagement Code System) code package has been developed at Rudjer Boskovic Institute in year 1991 with the aim to enable in-core fuel management analysis of the NPP Krsko core for nominal conditions. Due to modernization and uprating of the NPP Krsko core in year 2000 and the original 1991 FUMACS inadequacy in simulating NPP Krsko core in these uprated conditions, in the year 2001 a new version of FUMACS code package has been developed - FUMACS/FEEC 2001. The code package upgrading procedure consisted of two main aspects: modifications of master files, libraries and codes necessary for proper modeling of the uprated NPP Krsko core and development of the code package structure suitable for Windows-32 environment. The latter included upgrading the source of the code from FORTRAN F77 to F90 level and development of a graphical, user-friendly interface with fully integrated electronic help system. Since the original FUMACS code package has been developed as a DOS based application, running of the code package on a Windows operating system proved to be rather inefficient and lacking in advantages of a standard Windows application. Therefore, FUMACS-G has been developed as a user friendly environment for handling off all project input and output files, as well as for easier overall project management. The design of FUMACS-G shell has been based on Microsoft application design guidelines. (author)

  7. Model of fire spread around Krsko Power Plant

    International Nuclear Information System (INIS)

    Vidmar, P.; Petelin, S.

    2001-01-01

    The idea behind the article is how to define fire behaviour. The work is based on an analytical study of fire origin, its development and spread. The study is based on thermodynamics, heat transfer and the study of hydrodynamics and combustion, which represent the bases of fire dynamics. The article shows a practical example of a leak of hazardous chemicals from a tank. Because of the inflammability of the fluid, fire may start. We have tried to model fire propagation around the Krsko power plant, and show what extended surrounding area could be affected. The model also considers weather conditions, in particular wind speed and direction. For this purpose we have used the computer code Safer Trace, which is based on zone models. That means that phenomena are described by physical and empirical equations. An imperfection in this computer code is the inability to consider ground topology. However in the case of the Krsko power plant, topology is not so important, as the plan is located in a relatively flat region. Mathematical models are presented. They show the propagation of hazardous fluid in the environment considering meteorological data. The work also shows which data are essential to define fire spread and shows the main considerations of Probabilistic Safety Assessment for external fire event.(author)

  8. Re-racking the spent fuel pit in nuclear power plant Krsko

    International Nuclear Information System (INIS)

    Volaric, B.; Krajnc, B.

    2003-01-01

    Krsko NPP was designed to temporary store a limited number of spent fuel assemblies (SFA). They were planned to be either removed for reprocessing or permanently stored. By the design the plant would run out of capacity for temporary storing of SFAs in 2003. This means that the plant could not operate further without additional changes since valid regulations require the Spent Fuel Pit (SFP) free storage capacity for the whole emergency core unloading (ECU). The purpose of the SFP Reracking Project is to assure a safe storage of all SFAs in the existing SFP during the plant lifetime. Design solutions and related analysis did not only consider the quantity of spent fuel for the plant lifetime, i.e. up to the year 2023, but also a possibility of the SFP extension for eventually extended plant lifetime of 20 years. According to the project, racks were designed to provide up to 1694 cells for storage of FAs in Phase I which is sufficient for normal NPP operation up to its lifetime, i.e. the year 2023. The extension of temporary storage capacity of SFAs in the SFP was made by a combination of existing and new high-density racks. Three modules from the existing 12 were eliminated. Thus leaving 621 cells. There are nine new racks added with up to 1073 supercompacted cells installed in the empty part of the pool. The spacing between new cells is smaller than the one between existing cells because of special plates, made of borated stainless steel. The design of the racks fulfils all the applicable requirements to ensure sub-criticality of all stored SFAs, enriched up to 5 % U 235 with peak pellet burnup above 40 GWD/MTU. Besides static and dynamic seismic loading of both, the racks and the fuel handling building, sufficient cooling of FAs is provided as well as accident conditions precluded. Greater cooling capacity is achieved by installing the third heat exchanger, connected in parallel to existing two exchangers. The design and manufacturing of the new heat exchanger

  9. Overview of Mobile Equipment Used in Case of Beyond Design Basis Accident at NPP Krsko

    International Nuclear Information System (INIS)

    Lukacevic, H.; Kopinc, D.; Ivanjko, M.

    2016-01-01

    Terrorist attack in USA in the September 11, 2001 and accident at the Fukushima - Daiichi Nuclear Power Station in the March 11, 2011 highlight the importance of mitigating strategies in responding to Beyond Design Basis Accident (BDBA), while ensuring cooling of reactor core, containment and spent fuel pool. Nuclear Power Plant Krsko (NEK) has acquired additional mobile equipment and made necessary modifications on existing systems for the connection of this equipment (fast couplers). Usage of mobile equipment is not only limited to design basis accident (DBA), but, also to prevent and mitigate the consequences in case of BDBA, when other plant systems are not available. NEK also decided to take steps for upgrade of safety measures and prepared Safety Upgrade Program (SUP), which is consistent with the nuclear industry response to the Fukushima accident and is implementing main projects and modifications related to SUP. NEK mobile equipment is not required to operate under normal reactor plant operation except for periodic surveillance testing and is incorporated into the normal training process. Equipment is dislocated from the reactor building and most of the equipment is located in the new building, able to withstand extreme natural events, including earthquakes and tornadoes. The usage of all mobile equipment is prescribed as an additional option in NEK operating procedures in following cases and enables following options: filling various tanks, filling the steam generators, filling the containment, additional compressed air source, spent fuel pool refilling and spraying, alternative power supply. This document provides an overview of NEK mobile equipment, which consists of various mobile fire protection pumps, air compressors, protective equipment, fire trucks, diesel generators. Sufficient fuel supply for the equipment is provided on site for a minimum three days of operation. (author).

  10. Reactor core design calculations and fuel management in PWR; Izracun projekta sredice in upravljanja z forivom tlacnovodnega reaktorja

    Energy Technology Data Exchange (ETDEWEB)

    Ravnik, M [Institut Jozef Stefan, Ljubljana (Yugoslavia)

    1987-07-01

    Computer programs and methods developed at J. Stefan Institute for nuclear core design of Krsko NPP are treated. development, scope, verification and organisation of core design procedure are presented. The core design procedure is applicable to any NPP of PWR type. (author)

  11. Krsko: A case study for western nuclear power issues

    International Nuclear Information System (INIS)

    Bizal, M.R.

    1996-01-01

    This article is a review of issues surrounding the operation of the Krsko reactor in the former Yugoslav state of Slovenia. This reactor, a Westinghouse-supplied 632-MWe PWR, supplies 25% of Slovenia's electrical energy and is therefore a major element in the country's energy mix. There are environmental issues and political issues noted, and the project is currently evaluating the need for costly steam generator replacement

  12. A Method to Analyze Threats and Vulnerabilities by Using a Cyber Security Test-bed of an Operating NPP

    International Nuclear Information System (INIS)

    Kim, Yong Sik; Son, Choul Woong; Lee, Soo Ill

    2016-01-01

    In order to implement cyber security controls for an Operating NPP, a security assessment should conduct in advance, and it is essential to analyze threats and vulnerabilities for a cyber security risk assessment phase. It might be impossible to perform a penetration test or scanning for a vulnerability analysis because the test may cause adverse effects on the inherent functions of ones. This is the reason why we develop and construct a cyber security test-bed instead of using real I and C systems in the operating NPP. In this paper, we propose a method to analyze threats and vulnerabilities of a specific target system by using a cyber security test-bed. The test-bed is being developed considering essential functions of the selected safety and non-safety system. This paper shows the method to analyze threats and vulnerabilities of a specific target system by using a cyber security test-bed. In order to develop the cyber security test-bed with both safety and non-safety functions, test-bed functions analysis and preliminary threats and vulnerabilities identification have been conducted. We will determine the attack scenarios and conduct the test-bed based vulnerability analysis

  13. A Method to Analyze Threats and Vulnerabilities by Using a Cyber Security Test-bed of an Operating NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sik; Son, Choul Woong; Lee, Soo Ill [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    In order to implement cyber security controls for an Operating NPP, a security assessment should conduct in advance, and it is essential to analyze threats and vulnerabilities for a cyber security risk assessment phase. It might be impossible to perform a penetration test or scanning for a vulnerability analysis because the test may cause adverse effects on the inherent functions of ones. This is the reason why we develop and construct a cyber security test-bed instead of using real I and C systems in the operating NPP. In this paper, we propose a method to analyze threats and vulnerabilities of a specific target system by using a cyber security test-bed. The test-bed is being developed considering essential functions of the selected safety and non-safety system. This paper shows the method to analyze threats and vulnerabilities of a specific target system by using a cyber security test-bed. In order to develop the cyber security test-bed with both safety and non-safety functions, test-bed functions analysis and preliminary threats and vulnerabilities identification have been conducted. We will determine the attack scenarios and conduct the test-bed based vulnerability analysis.

  14. Minimum success criteria at SGTR combined with loss of secondary heat sink

    International Nuclear Information System (INIS)

    Parzer, I.; Petelin, S.

    1993-01-01

    A parametric analysis has been performed investigating minimum success criteria for the hypothetical Steam Generator Tube Rupture (SGTR) accident in a Pressurized Water Reactor (PWR) Nuclear Power Plant, combined with the total loss of secondary heat sink. The analyses have been performed by RELAP5/MOD2 and MOD3 computer codes using Krsko NPP input deck. The Krsko NPP is a 2-loop Westinghouse PWR, 640 MWe, located in Slovenia and operating from 1981. Two break sizes have been chosen for the SGTR event: 2 and 5 double-ended broken tubes have been assumed. Total loss of secondary heat sink has been assumed from the beginning of the calculation. The ways of cooling down the plant after the postulated accident have been investigated, including Bleed ampersand Feed through the primary system. The NPP Krsko Emergency Operating Procedures (EOP) have been verified for this case. Some suggestions have been made, how to improve FR-H.1 procedure (Loss of Secondary Heat Sink), to include some steps, which take into account also SGTR when it is combined with loss of secondary heat sink. Possible misinterpretations of E-0 procedure (Reactor Trip or Safety Injection) have been studied

  15. Contribution of Nuclear Training Centre in Ljubljana to Training and Information in the Area of Nuclear Technology

    International Nuclear Information System (INIS)

    Stritar, A.

    1998-01-01

    Nuclear Training Centre in Ljubljana ia a part of the Jozef Stefan Institute. The paper presents its main activities, which consist of training for NPP Krsko staff, training in the area of radiation protection, organization of international training courses and public information. NPP Krsko personnel obtains initial technical training at our training centre. We are also offering training courses and licensing for people working with radioactive substances in medicine, industry and science. We are internationally recognized training centre for organization of regional and interregional courses and meeting. Our fourth activity is public information. We are visited by around 7000 students per year and answer to every question about nuclear energy. (author)

  16. Public opinion about nuclear energy. Year 2006 poll

    International Nuclear Information System (INIS)

    Istenic, R.; Jencic, I.; Tkavc, M.

    2006-01-01

    Public information, one of the important activities of the Nuclear Training Centre Milan Copic at the Jozef Stefan Institute in Ljubljana, is focused on youngsters. Almost one half of every generation of schoolchildren in Slovenia is informed on nuclear energy by live lectures, exhibition, publications and laboratory demonstrations. To measure the opinion of youngsters about nuclear power and get a feed-back for our activities about 1000 youngsters are polled every year since 1993 using the same basic set of questions. Continued operation of the NPP Krsko is supported by 76% of youngsters in Slovenia (slightly positive trend from the last year's 71%). Opposition to NPP Krsko operation remains low. (author)

  17. The application of model with lumped parameters for transient condition analyses of NPP

    International Nuclear Information System (INIS)

    Stankovic, B.; Stevanovic, V.

    1985-01-01

    The transient behaviour of NPP Krsko during the accident of pressurizer spray valve stuck open has been simulated y lumped parameters model of the PWR coolant system components, developed at the faculty of Mechanical Engineering, University of Belgrade. The elementary volumes which are characterised by the process and state parameters, and by junctions which are characterised by the geometrical and flow parameters are basic structure of physical model. The process parameters obtained by the model RESI, show qualitative agreement with the measured valves, in a degree in which the actions of reactor safety engineered system and emergency core cooling system are adequately modelled; in spite of the elementary physical model structure and only the modelling of thermal process in reactor core and equilibrium conditions of pressurizer and steam generator. The pressurizer pressure and liquid level predicted by the non-equilibrium pressurizer model SOP show good agreement until the HIPS (high pressure pumps) is activated. (author)

  18. Suggestion of a Framework to Analyze Failure Modes and Effect of Cyber Attacks in NPP

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chan Young; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of)

    2016-05-15

    The cyber security issue on NPP is inevitable issue. Unlike general cyber security, cyber-physical system like NPP can induce serious consequences such as core damage by cyber-attack. So in this paper, to find how hacker can attack the NPP, (1) PSA results were utilized to find the relationship between physical system and cyber-attack and (2) vulnerabilities on digital control systems were investigated to find how hacker can implement the possible attack. It is expected that these steps are utilized when establishing penetration test plans or cyber security drill plans.

  19. Suggestion of a Framework to Analyze Failure Modes and Effect of Cyber Attacks in NPP

    International Nuclear Information System (INIS)

    Lee, Chan Young; Seong, Poong Hyun

    2016-01-01

    The cyber security issue on NPP is inevitable issue. Unlike general cyber security, cyber-physical system like NPP can induce serious consequences such as core damage by cyber-attack. So in this paper, to find how hacker can attack the NPP, (1) PSA results were utilized to find the relationship between physical system and cyber-attack and (2) vulnerabilities on digital control systems were investigated to find how hacker can implement the possible attack. It is expected that these steps are utilized when establishing penetration test plans or cyber security drill plans

  20. Some Aspects of Process Computers Configuration Control in Nuclear Power Plant Krsko - Process Computer Signal Configuration Database (PCSCDB)

    International Nuclear Information System (INIS)

    Mandic, D.; Kocnar, R.; Sucic, B.

    2002-01-01

    During the operation of NEK and other nuclear power plants it has been recognized that certain issues related to the usage of digital equipment and associated software in NPP technological process protection, control and monitoring, is not adequately addressed in the existing programs and procedures. The term and the process of Process Computers Configuration Control joins three 10CFR50 Appendix B quality requirements of Process Computers application in NPP: Design Control, Document Control and Identification and Control of Materials, Parts and Components. This paper describes Process Computer Signal Configuration Database (PCSCDB), that was developed and implemented in order to resolve some aspects of Process Computer Configuration Control related to the signals or database points that exist in the life cycle of different Process Computer Systems (PCS) in Nuclear Power Plant Krsko. PCSCDB is controlled, master database, related to the definition and description of the configurable database points associated with all Process Computer Systems in NEK. PCSCDB holds attributes related to the configuration of addressable and configurable real time database points and attributes related to the signal life cycle references and history data such as: Input/Output signals, Manually Input database points, Program constants, Setpoints, Calculated (by application program or SCADA calculation tools) database points, Control Flags (example: enable / disable certain program feature) Signal acquisition design references to the DCM (Document Control Module Application software for document control within Management Information System - MIS) and MECL (Master Equipment and Component List MIS Application software for identification and configuration control of plant equipment and components) Usage of particular database point in particular application software packages, and in the man-machine interface features (display mimics, printout reports, ...) Signals history (EEAR Engineering

  1. Experience with high percent step load decrease from full power in NPP Krsko

    International Nuclear Information System (INIS)

    Vukovic, V.

    2000-01-01

    The control system of NPP Kriko, is designed to automatically control the reactor in the power range between 15 and 100 percent of rated power for the following designed transients; - 10 percent step change in load; 5 percent per minute loading and unloading; step full load decrease with the aid of automatically initiated and controlled steam dump. Because station operation below 15 percent of rated power is designed for a period of time during startup or standby conditions, automatic control below 15 percent is not provided. The steam dump accomplishes the following functional tasks: it permits the nuclear plants to accept a sudden 95 percent loss of load without incurring reactor trip; it removes stored energy and residual heat following a reactor trip and brings the plant to equilibrium no-load conditions without actuation of the steam generator safety valves; it permits control of the steam generator pressure at no-load conditions and permits a manually controlled cooldown of the plant. The first two functional tasks are controlled by Tavg. The third is controlled by steam pressure. Interlocks minimise any possibility of an inadvertent actuation of steam dump system. This paper discusses relationships between designed (described) characteristics of plant and the data which are obtained during startup and/or first ten years of operation. (author)

  2. Thermohydraulic analysis of nuclear power plant accidents by computer codes

    International Nuclear Information System (INIS)

    Petelin, S.; Stritar, A.; Istenic, R.; Gregoric, M.; Jerele, A.; Mavko, B.

    1982-01-01

    RELAP4/MOD6, BRUCH-D-06, CONTEMPT-LT-28, RELAP5/MOD1 and COBRA-4-1 codes were successful y implemented at the CYBER 172 computer in Ljubljana. Input models of NPP Krsko for the first three codes were prepared. Because of the high computer cost only one analysis of double ended guillotine break of the cold leg of NPP Krsko by RELAP4 code has been done. BRUCH code is easier and cheaper for use. Several analysis have been done. Sensitivity study was performed with CONTEMPT-LT-28 for double ended pump suction break. These codes are intended to be used as a basis for independent safety analyses. (author)

  3. Analysis of steam generator behaviour in nuclear power plant with computer program RELAP5; Analiza delovanja uparjalnika jedrske elektrarne s programom RELAP5

    Energy Technology Data Exchange (ETDEWEB)

    Zeljko, M; Gregoric, M; Peterlin, G [Institut ' Jozef Stefan' , Ljubljana (Yugoslavia)

    1983-07-01

    Analyses of nuclear power plant behaviour are made with large computer programs. We used RELAP5/MOD1/CYCLE001, which was developed in Idaho National Engineering laboratory. Input model was prepared to analyze transients in steam generator of NPP Krsko. We found out that this version had a lot of faults so we intend to implement a new cycle. First experience shows the whole complexity of such analysis from technical and economical viewpoints. (author)

  4. Radioactive control of Krsko Nuclear Power Plant in the year 1995

    International Nuclear Information System (INIS)

    Lulic, S.; Miklavzic, U.; Franic, Z.; Kanduc, M.

    1996-01-01

    Regular Krsko Nuclear Power Plant (NPPK) radioactivity control comprises the supervisions of the inventory of liquid and gaseous emissions at the source, and the independent supervisions of the input of radionuclides into larger environment. The controlled environment area consist primarily of a 12 kilometers large circle around the object, where the largest values of immission could be expected, and where possible changes in the Sava river and the underground waters could first be noticed. The circle has been enlarged upon the territory of the Republic of Croatia (RC) from Jesenice on Dolenjsko until Podsused (30 km of air-line distance). As reference points relevant for the readiness in the case of accident, especially for detection of iodine and aerosol air transport, the program comprises also measuring points in the RC at larger distances (from 14 to 27 km) in the direction of Zagreb its larger western surroundings (passive Thermoluminescent (TL) dosimeters in each 42 km long). Continuous of control of emission is performed by the radiological service of (KNPP) by routine procedures, supplemented by adequate measurements from other authorized institutions. Summarized results of radioactive measurements for man-made and natural radionuclides are presented for different transfer media and exposure pathways in the form of assessed effective doses. Conservatively estimated dose burdens received by a member of the reference (critical) population group as the result of NPP emissions amount to a value of the committed effective dose equivalent smaller than 20 μSv/year. This value represents less than 1% of the annual dose received on average from natural and artificial sources by a member of the general public in the normal environment. The yearly doses from natural radioactivity, global contamination , non-nuclear industries and hospitals are also estimated from the measured data in some media. (author)

  5. Development of new process network for gas chromatograph and analyzers connected with SCADA system and Digital Control Computers at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Deneanu, Cornel; Popa Nemoiu, Dragos; Nica, Dana; Bucur, Cosmin

    2007-01-01

    The continuous monitoring of gas mixture concentrations (deuterium/ hydrogen/oxygen/nitrogen) accumulated in 'Moderator Cover Gas', 'Liquid Control Zone' and 'Heat Transport D 2 O Storage Tank Cover Gas', as well as the continuous monitoring of Heavy Water into Light Water concentration in 'Boilers Steam', 'Boilers Blown Down', 'Moderator heat exchangers', and 'Recirculated Water System', sensing any leaks of Cernavoda NPP U1 led to requirement of developing a new process network for gas chromatograph and analyzers connected to the SCADA system and Digital Control Computers of Cernavoda NPP Unit 1. In 2005 it was designed and implemented the process network for gas chromatograph which connected the gas chromatograph equipment to the SCADA system and Digital Control Computers of the Cernavoda NPP Unit 1. Later this process network for gas chromatograph has been extended to connect the AE13 and AE14 Fourier Transform Infrared (FTIR) analyzers with either. The Gas Chromatograph equipment measures with best accuracy the mixture gases (deuterium/ hydrogen/oxygen/nitrogen) concentration. The Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers measure the Heavy Water into Light Water concentration in Boilers Steam, Boilers BlownDown, Moderator heat exchangers, and Recirculated Water System, monitoring and signaling any leaks. The Gas Chromatograph equipment and Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers use the new OPC (Object Link Embedded for Process Control) technologies available in ABB's VistaNet network for interoperability with automation equipment. This new process network has interconnected the ABB chromatograph and Fourier Transform Infrared analyzers with plant Digital Control Computers using new technology. The result was an increased reliability and capability for inspection and improved system safety

  6. NPP Krsko Aging Management Program

    International Nuclear Information System (INIS)

    Glaser, B.; Spiler, J.

    2002-01-01

    As a part of Periodic Safety Review Program (PSR) NEK will review and perform some activities related to Equipment Qualification (EQ) and Aging Management Program (AMP). (EQ) and AMP are safety factors, which need to be assessed during PSR. The goal of PSR and AMP is to determine aging effects and give the conclusion whether the plant has been managed to control aging related degradations and that safety margins are maintained. The parallel goal is also to establish AMP for future plant operation and provide basis for possible Life Extension Program. NEK will develop NEK Aging and Life Cycle Management Program, similar by format and content to one determined by License Renewal program. The bases are in 10CFR54, and NEI 95-10 Industry Guidelines for 10 CFR 54 implementation. The process of establishment the AMP is to be done in two steps. The first step is dealing with SSC's (Systems Structures and Components) scoping and screening and identification of TLAA's (Time Limited Aging Analyses). That means, that a database of all SSC's and TLAA's will be created and then evaluated within AMP program. Based on the scope in first phase an evaluation will be performed in step two. NEK will maintain AMP program as a living program that may be also used for Life Extension and Life Cycle Management. This paper will present and describe AMP, scoping and screening process and the results achieved through the first phase of the project.(author)

  7. Krsko NPP ecological information system

    International Nuclear Information System (INIS)

    Kovac, A.; Breznik, B.

    1996-01-01

    The Ecological Information System was developed and is used for continuous data collecting from different measuring points as well as for dose calculation in case of emergency. The system collects all the data which are continuously measured in the environment or might have influence to the environment or are necessary for evaluation of impact to the environment. (author)

  8. Radiation ecological monitoring in NPP region

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1985-01-01

    The known principle of sanitary-hygienic regulation of NPP radiation effect on man and environment is analyzed. An ecological approach is required to optimize NPP relations with the environment and to regulate radioactivity of the NPP - environment system. The ecological approach envisages the development of standards of permissible concentrations of radioactive and chemical substances (as well as heat) in natural environment, taking into account their synergism, corresponding to ecologically permissible response reactions of biota to their effect. The ecological approach also comprises the sanitary-hygienic principle of radiation protection of man. Attention is paid to ecological monitoring in NPP region, comprising consideration of factors, affecting the environment, evaluation of the actual state of the environment, prediction of the environmental state, evaluation of the expected environmental state

  9. Outlet from the condenser of nuclear power plant Krsko into Sava river

    International Nuclear Information System (INIS)

    Rek, Z.

    1990-01-01

    Paper deals with hot water outflow from condenser of the Nuclear power plant Krsko into river Sava. We are interested in temperature and velocity field along the river. Boundary-domain integral method is used to solve a system of conservative equations. As a result, the time development of the velocity and temperature field at nodes of discrete model is obtained. (author)

  10. Report of the technical committee meeting 1997 annual workshop on ASSET experience and feedback

    International Nuclear Information System (INIS)

    1997-01-01

    Papers and presentations were made by all participating countries and provided a wide range of perspectives on the use of the ASSET methodology. Generally, the views expressed were positive, however, there were comments on areas were the service could be improved or enhanced. The workshop was divided into three task groups to analyze the self-assessments conducted at Krsko NPP, Slovenia; Dukovany NPP, Czech Republic; and Balakovo NPP, Russian Federation. In addition, they were asked to comment on the recommendations on the ASSET service made by the Consultants' Meeting of 26-30 August 1996 on ''Performance of the IAEA programme on Operational Safety Services''. A presentation was made by Mr. B. Thomas to remind delegates of the ASSET methodologies, and Mr. V. Sivokon demonstrated the latest developments of computer software available for assisting in the plant Self-Assessment process. Refs, figs, tabs

  11. Report of the technical committee meeting 1997 annual workshop on ASSET experience and feedback

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Papers and presentations were made by all participating countries and provided a wide range of perspectives on the use of the ASSET methodology. Generally, the views expressed were positive, however, there were comments on areas were the service could be improved or enhanced. The workshop was divided into three task groups to analyze the self-assessments conducted at Krsko NPP, Slovenia; Dukovany NPP, Czech Republic; and Balakovo NPP, Russian Federation. In addition, they were asked to comment on the recommendations on the ASSET service made by the Consultants` Meeting of 26-30 August 1996 on ``Performance of the IAEA programme on Operational Safety Services``. A presentation was made by Mr. B. Thomas to remind delegates of the ASSET methodologies, and Mr. V. Sivokon demonstrated the latest developments of computer software available for assisting in the plant Self-Assessment process. Refs, figs, tabs.

  12. Mathematical model of the reactor coolant pump

    International Nuclear Information System (INIS)

    Kozuh, M.

    1989-01-01

    The mathematical model of reactor coolant pump is described in this paper. It is based on correlations for centrifugal reactor coolant pumps. This code is one of the elements needed for the simulation of the whole NPP primary system. In subroutine developed according to this model we tried in every possible detail to incorporate plant specific data for Krsko NPP. (author)

  13. Radioactive Control of Krsko Nuclear Power Plant Environment in the Year 1997

    International Nuclear Information System (INIS)

    Lulic, S.; Miklavzic, U.; Franic, Z.; Kanduc, M.

    1998-01-01

    Regular Krsko Nuclear Power Plant (NPPK) radioactivity control comprises the supervisions of the inventory of liquid and gaseous emissions at the source, and the independent supervisions of the input of radionuclides into larger environment (imisson). The controlled environment area consists primarily of a 12 kilometers large circle around the object, where the largest values of imission could be expected, and where possible changes in the Sava river and the underground waters could first be noticed. The circle has been enlarged upon the territory of the Republic of Croatia (RC) from Jesenice on Dolenjsko until Podsused (30 km of air - line distance). As reference points relevant for the readiness in the case of accident, especially for detection of iodine and aerosol air transport, the program comprises also measuring points in the RC at larger distances (from 14 to 27 km) in the direction of Zagreb its larger western surroundings (passive Thermoluminescent (TL) dosimeters in the each 42 km long). Continuous control of emission is performed by the radiological service of KNPP by routine procedures, supplemented by adequate measurements from other authorized institutions (intercomparisons, parallel measurements of representative and other samples). Summarised results of radioactive measurements for man-made and natural radionuclides are presented for different transfer media and exposure pathways in the form of assessed effective doses. Conservatively estimated dose burdens received by a member of the reference (critical) population group as the result of NPP emissions amount to a value of the committed effective dose equivalent smaller than 20 μSv/year. This value represents less than 1 % of the annual dose received on average from natural and artificial sources by a member of the general public in the normal environment. The yearly doses from natural radioactivity, global contamination (Chernobyl, atmospheric nuclear explosions), non-nuclear industries and

  14. Training center of Rovenskaya NPP. The experience of creation

    International Nuclear Information System (INIS)

    Fedorov, O.M.; Aristov, B.N.

    1991-01-01

    Experience in creation of a teaching-training centre at the Rovno NPP, which uses means available at unified NPPs, at most is discussed. The centre hardware complex functions include the event filing and providing for user-friendly interface with NPP technical personnel under training. The system of personnel training at the Rovno NPP teaching-training centre gives an opportunity to analyze accidents and emergency conditions more completely and carefully. The taching analysis of failures and accidents by a NPP operators using the complex of the teaching-training centre hardware sufficiently improves knowledge of particular accidents

  15. Does climate directly influence NPP globally?

    Science.gov (United States)

    Chu, Chengjin; Bartlett, Megan; Wang, Youshi; He, Fangliang; Weiner, Jacob; Chave, Jérôme; Sack, Lawren

    2016-01-01

    The need for rigorous analyses of climate impacts has never been more crucial. Current textbooks state that climate directly influences ecosystem annual net primary productivity (NPP), emphasizing the urgent need to monitor the impacts of climate change. A recent paper challenged this consensus, arguing, based on an analysis of NPP for 1247 woody plant communities across global climate gradients, that temperature and precipitation have negligible direct effects on NPP and only perhaps have indirect effects by constraining total stand biomass (Mtot ) and stand age (a). The authors of that study concluded that the length of the growing season (lgs ) might have a minor influence on NPP, an effect they considered not to be directly related to climate. In this article, we describe flaws that affected that study's conclusions and present novel analyses to disentangle the effects of stand variables and climate in determining NPP. We re-analyzed the same database to partition the direct and indirect effects of climate on NPP, using three approaches: maximum-likelihood model selection, independent-effects analysis, and structural equation modeling. These new analyses showed that about half of the global variation in NPP could be explained by Mtot combined with climate variables and supported strong and direct influences of climate independently of Mtot , both for NPP and for net biomass change averaged across the known lifetime of the stands (ABC = average biomass change). We show that lgs is an important climate variable, intrinsically correlated with, and contributing to mean annual temperature and precipitation (Tann and Pann ), all important climatic drivers of NPP. Our analyses provide guidance for statistical and mechanistic analyses of climate drivers of ecosystem processes for predictive modeling and provide novel evidence supporting the strong, direct role of climate in determining vegetation productivity at the global scale. © 2015 John Wiley & Sons Ltd.

  16. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  17. Nuclear energy as a part of national energy strategy of Slovenia

    International Nuclear Information System (INIS)

    Stritar, A.

    2002-01-01

    Slovenian National Committee of the World Energy Council has prepared the draft of the National Energy Strategy of Slovenia for next 20 years. Following are the main conclusions of the nuclear part of proposed National Energy Strategy of Slovenia: NPP Krsko should operate until the end of its lifetime; possibilities for the extension of the operating lifetime of NPP Krsko should be investigated; possible new nuclear units of smaller size should be seriously considered after 2010; advantage should be taken of established knowledge basis and infrastructure and the option for construction of additional nuclear unit for production for European electricity market should be kept open; the site for the low and intermediate waste repository should be found as soon as possible, while the spent nuclear fuel should be stored temporarily until some regional solutions are available.(author)

  18. To the problem of reliability standardization in computer-aided manufacturing at NPP units

    International Nuclear Information System (INIS)

    Yastrebenetskij, M.A.; Shvyryaev, Yu.V.; Spektor, L.I.; Nikonenko, I.V.

    1989-01-01

    The problems of reliability standardization in computer-aided manufacturing of NPP units considering the following approaches: computer-aided manufacturing of NPP units as a part of automated technological complex; computer-aided manufacturing of NPP units as multi-functional system, are analyzed. Selection of the composition of reliability indeces for computer-aided manufacturing of NPP units for each of the approaches considered is substantiated

  19. Outages 1999 and 2000, investments in safety and long-term operation of NE Krsko

    International Nuclear Information System (INIS)

    Sirola, P.; Krajnc, J.; Androjna, F.

    1999-01-01

    Plant outage is an important part of nuclear power plant operation. During that time the conditions are established for the performance of specific activities, such as refueling, tests, inspections, preventive and corrective maintenance and modifications, that are intended to confirm proper condition and availability of safety and other important components and improve overall plant safety and reliability. It is well know that in Nuclear Power Plant Krsko (Nuklearna elektrarna Krsko NEK) during Outage 2000 new Steam Generators (SGs) will be placed in service, while Outage '99 was used for preparatory works. But the importance of those two outages is even greater, because they are implementing a broad number of improvements and establishing a basis for long-term plant operation. Outage '99 required very detailed planning to assure a good control over the outage activities and operational plant systems necessary for safe shutdown. Numerous activities took place in a relatively narrow space in the Reactor Building. Some of these activities will have a big significance for the future. The article treats the status update and summarizes the specifics and importance of the mentioned activities to long-term plant safe and reliable operation.(author)

  20. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  1. Development of a decommissioning plan for nuclear power plant 'Krsko'

    International Nuclear Information System (INIS)

    Tankosic, Djurica; Fink, Kresimir

    1991-01-01

    Nuclear Power Plant 'Krsko' (NEK), is the only nuclear power plant in Yugoslavia, is a two-loop, Westinghouse-design, pressurized water reactor rated at 632 MWe. When NEK applied for an operating license in 1981, it did not have to explain how the plant would be decommissioned and decommissioning provisions were not part of the licensing process. Faced with mounting opposition to nuclear power and a real threat that the plant would be shut down, the plant management developed a Mission Plan for resolving the decommissioning problem. The Mission Plan calls for a preliminary decommissioning plan to be prepared and submitted to the local regulatory body before the end of 1992

  2. Plant safety and performance indicators for regulatory use

    International Nuclear Information System (INIS)

    Ferjancic, M.; Nemec, T.; Cimesa, S.

    2004-01-01

    Slovenian Nuclear Safety Administration (SNSA) supervises nuclear and radiological safety of Krsko NPP. This SNSA supervision is performed through inspections, safety evaluations of plant modifications and event analyses as well as with the safety and performance indicators (SPI) which are a valuable data source for plant safety monitoring. In the past SNSA relied on the SPI provided by Krsko NPP and did not have a set of SPI which would be more appropriate for regulatory use. In 2003 SNSA started with preparation of a new set of SPI which would be more suitable for performing the regulatory oversight of the plant. New internal SNSA procedure which is under preparation will define use and evaluation of SPI and will include definitions for the proposed set of SPI. According to the evaluation of SPI values in comparison with the limiting values and/or trending, the procedure will define SNSA response and actions. (author)

  3. Calculation of Environmental Conditions in NEK Intermediate Building Following HELB

    International Nuclear Information System (INIS)

    Grgic, D.; Spalj, S.; Basic, I.

    1998-01-01

    The purpose of Equipment Qualification (EQ) in nuclear power plants is to ensure the capability of safety related equipment to perform its function on demand under postulated service conditions, including harsh accident environment (e.g. Loss of Coolant Accident - LOCA, High Energy Line Break - HELB). The determination of the EQ conditions and zones is one of the basic steps in the frame of the overall EQ project. The EQ parameters (temperature, pressure, relative humidity, chemical spray, submergence, radiation) should be defined for all locations of the plant containing equipment important to safety. This paper presents the calculation of thermohydraulic environmental parameters (pressure and temperature) inside Intermediate Building (IB) of Krsko NPP after the postulated HELB. The RELAP5/mod2 computer code was used for the determination of HELB mass and energy release and computer code GOTHIC was used to calculate pressure and temperature profiles inside NPP Krsko IB. (author)

  4. Experience on implementing risk-oriented in-service inspection at NPP in USA

    International Nuclear Information System (INIS)

    Grebenyuk, Yu.P.; Zaritskij, N.S.; Kovyrshin, V.G.; Kostenko, S.P.

    2001-01-01

    Experience of implementing risk-oriented in-service inspection (RIISI) of pipelines at the US NPP analyzed. RIISI processes according to the methodologies developed by Westinghouse and EPRI are described and compared. The information is addressed concerning practical matters of RIISI implementing at NPP Beaver Valley and Arkansas Nuclear One. Regulatory activity of the US NRC while implementing NRC at the US NPP. It is shown that using RIISI at NPP is aimed at improvement of examination efficiency, decreasing costs and occupational dose loads while inspecting pipelines

  5. Transition from 12 months to 18 months cycles at Krsko in a core physics perspective

    International Nuclear Information System (INIS)

    Jensen-Tornehed, J.

    2004-01-01

    Krsko has historically been operating in 12 months cycles with an annual outage for refuelling and maintenance work. Krsko is now in a transition from 12 months to 18 months cycles. Cycle 19, June 2002 - May 2003, was the last 12 month cycle. Cycle 20, June 2003 - September 2004 is a 15 month transition cycle and cycle 21, September 2004 - April 2006 will be the first 18 month cycle. This paper will describe the effects of the transition in a core physics perspective. There are big differences in how to design an 18 month cycle in comparison with a 12 month cycle. The required number of feed assemblies increases, as well as the content of burnable absorbers in the fuel. The strategy of the loading pattern has to be changed with the increased number of fresh fuel assemblies. The most limiting margins can be different for different cycle lengths which also affect the fresh assembly design and loading pattern during the transition. During the core design for cycle 21 the Moderator Temperature Coefficient was the main issue, which caused the need for extra amount of burnable absorbers. (author)

  6. Radiation monitoring in the NPP environment, control of radioactivity in NPP-environment system

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1987-01-01

    Problems of radiation monitoring and control of the NPP-environment system (NPPES) are considered. Radiation control system at the NPP and in the environment provides for the control of the NPP, considered as the source of radioactive releases in the environment and for the environmental radiation climate control. It is shown, that the radiation control of the NPP-environment system must be based on the ecological normalization principles of the NPP environmental impacts. Ecological normalization should be individual for the NPP region of each ecosystem. The necessity to organize and conduct radiation ecological monitoring in the NPP regions is pointed out. Radiation ecological monitoring will provide for both environmental current radiation control and information for mathematical models, used in the NPPES radiation control

  7. Evaluation of consequences and risks in Slovenia

    International Nuclear Information System (INIS)

    Susnik, J.

    1996-01-01

    The paper describes the evaluation of nuclear power plant accident consequences and risks using probabilistic safety codes during the last 12 years at the J. Stefan Institute. They cover classic individual and population risk studies due to assumed potential severe accident scenarios, prediction and estimation of Chernobyl accident consequences, the optimization of emergency countermeasures at the Krsko site, where the 632 MWe Westinghouse PWR NPP went into commercial operation on January 1983, and the ranking of population risk within the public debate in connection with the civil initiative to close the NPP Krsko. We report on the initial use of the CRAC2 code in 1984 and later, when it was first applied for the study of population risk in the area of the second planned Slovenian-Croatian NPP for the Prevlaka site. The study was completed a few weeks before the Chernobyl accident in April 1986. Risk evaluation was also included in the analysis of nuclear safety at the NPP Krsko during the war for Slovenia's independence in 1991. We report on the (CRAC2) analyses of the Chernobyl accident: on initial estimation of the maximal potentially expected consequences in Slovenia, on the effect of the radioactive cloud rise on the consequences relatively close to the NPP; on the further research after the detailed information on the radioactivity release and on the air masses movement were published; then the cloud activity which moved towards Slovenia was assessed and the expected consequences along its path were calculated. As the calculated integral individual exposure to the I 131 inhalation and the ground Cs 137 contamination matched with the measurements in Ljubljana and with the UNSCEAR 1988 data, our reliance on the CRAC2 code and on its ancestors is high. We report on the analyses, performed by the CRAC2 code and since 1993 also by the PC COSYMA code, related to the countermeasure effects. The consequences studied were extended to late health effects. We analyzed

  8. Technology for NPP decantate treatment realized at Kola NPP

    International Nuclear Information System (INIS)

    Stakhiv, Michael; Avezniyazov, Slava; Savkin, Alexander; Fedorov, Denis; Dmitriev, Sergei; Kornev, Vladimir

    2007-01-01

    At Moscow SIA 'Radon' jointly with JSC 'Alliance Gamma', the technology for NPP Decantate Treatment was developed, tested and realized at Kola NPP. This technology consists of dissolving the salt residue and subsequent treatment by ozonization, separation of the deposits formed from ozonization and selective cleaning by ferro-cyanide sorbents. The nonactive salt solution goes to an industrial waste disposal site or a repository specially developed at NPP sites for 'exempt waste' products by IAEA classification. This technology was realized at Kola NPP in December 2006 year. At this time more than 1000 m 3 of decantates log time stored are treated. It allows solving very old problem to empty decantates' tanks at NPPs in environmentally safe manner and with high volume reduction factor. (authors)

  9. Principles of Defense-in-depth philosophy applied in NPP engineering management

    International Nuclear Information System (INIS)

    Wu Guangwei

    2011-01-01

    Based on the Defense-in-depth Concept in nuclear and radiation safety, Defense-in-depth Concept for design management of Nuclear Power Plant (NPP) is developed in this paper to analyze the feasibility and importance of the application of the basic principle: Defense-in-depth concept in NPP systems performed during the design control of NPP. This paper focuses on the NPP engineering management process, and according to the analysis of such process, 5 principles of Defense-in-depth Concept applied in NPP design management are raised: (1) preventing the non-conformities of design via effective design quality management system; (2) discovering and correcting non-conformities of design quality in time via design checkup and design review meeting; (3) carrying out timely analysis and treatment against design non-conformities which have been transferred to construction phase; (4) Assessing and judging the severe non-conformities in construction phase, putting forward treatment opinions and remedies accordingly so as to avoid the existence of such non-conformities in physical construction of NPP; (5) Paying 'return-visit' and performing 'post-assessment' for NPP design to assess the designed functions and safety of NPP comprehensively. (author)

  10. Operator reliability analysis during NPP small break LOCA

    International Nuclear Information System (INIS)

    Zhang Jiong; Chen Shenglin

    1990-01-01

    To assess the human factor characteristic of a NPP main control room (MCR) design, the MCR operator reliability during a small break LOCA is analyzed, and some approaches for improving the MCR operator reliability are proposed based on the analyzing results

  11. Social responsible communication of nuclear power plant with external stakeholders

    Energy Technology Data Exchange (ETDEWEB)

    Simoncic, Milan [Nuclear Power Plant Krsko (Slovenia); Zurga, Gordana [Faculty of Organisation Studies in Novo Mesto (Slovenia)

    2016-11-15

    Implications that nuclear technology brings to common physical and social environment, are on daily lists of questions that stakeholders address to owners and operators of nuclear power plants. In this respect, stakeholders expect and demand narrow and explicit answers to concrete questions set. We claim that the acceptability of the NPP in the society can be achieved and maintained also through active communication and trust building between NPP and its stakeholders. A research in this respect was conducted on case of the Krsko NPP, Slovenia. Some institutional and international implications are presented, as well as possible areas for further investigation and research.

  12. Group constants calculation for fuel assemblies containing burnable absorbers; Prorachun grupnih konstanti gorivnih elemenata koji sadrzhe sagorive apsorbere

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, B [Institut Rudjer Boskovic, Zagreb (Yugoslavia); Pevec, D [Elektrotehnicki Fakultet, Zagreb Univ. (Yugoslavia); Urli, N; Shmuc, T [Institut Rudjer Boskovic, Zagreb (Yugoslavia)

    1988-07-01

    The upgrading of the computer code package PSU-LEOPARD/MCRAC is described. The upgraded package enables modelling of fuel assemblies containing burnable absorbers in the form of borosilicate glass rodlets, or, integral fuel burnable absorbers. The package is tested using the NPP Krsko core data. (author)

  13. Nuclear and radiation safety in Slovenia. Annual report 2001

    International Nuclear Information System (INIS)

    Janzekovic, H.

    2002-01-01

    The Slovenian Nuclear Safety Administration (SNSA) has prepared a Report on Nuclear and Radiation Safety in Slovenia for 2001 as a regular form of reporting to the citizens of the Republic of Slovenia on the activities related to the nuclear fuel cycle and the use of the ionising sources. The report has been prepared in collaboration with the Health Inspectorate of the Republic of Slovenia (HIRS), the Administration for Civil Protection and Disaster Relief (ACPDR), the Pool for Assurance and Reinsurance of Liability for Nuclear Damage and the Pool for Decommissioning of the NPP Krsko and for the Radwaste Disposal from the NPP Krsko. The reports of the Agency for Radioactive Waste Management (ARAO), the Institute of Oncology, the Department of Nuclear Medicine of the Medical Centre Ljubljana and the technical support organisations are also included. The SNSA made no crucial modifications to the reports of the above mentioned institutions. The modifications were made just facilitate a reading of the reports. (author)

  14. Report on nuclear and radiation safety in Slovenia in 2001

    International Nuclear Information System (INIS)

    Janzekovic, H.

    2002-01-01

    The Slovenian Nuclear Safety Administration (SNSA) has prepared a Report on Nuclear and Radiation Safety in Slovenia for 2001 as a regular form of reporting to the citizens of the Republic of Slovenia on the activities related to the nuclear fuel cycle and the use of the ionising sources. The report has been prepared in collaboration with the Health Inspectorate of the Republic of Slovenia (HIRS), the Administration for Civil Protection and Disaster Relief (ACPDR), the Pool for Assurance and Reinsurance of Liability for Nuclear Damage and the Pool for Decommissioning of the NPP Krsko and for the Radwaste Disposal from the NPP Krsko. The reports of the Agency for Radioactive Waste Management (ARAO), the Institute of Oncology, the Department of Nuclear Medicine of the Medical Centre Ljubljana and the technical support organisations are also included. The SNSA made no crucial modifications to the reports of the above mentioned institutions. The modifications were made just facilitate a reading of the reports.

  15. NEK containment integrated leak rate test at full pressure

    International Nuclear Information System (INIS)

    Skaler, F.; Planinc, V.; Gregoric, D.; Cicvaric, D.

    1999-01-01

    NPP Krsko is a Pressure Water Reactor (PWR) Plant which has four barriers to prevent release of radioactive fission products. These four barriers are following: Fuel itself, Fuel Clad, Reactor Coolant System and Containment Building. Containment is the last barrier which can prevent release of fission product when other barriers have been already broken. To find out the real condition of containment vessel and to prove its ability of withstanding increased parameters during accident we have to perform Containment Integrated Leak Rate Test at least three times in every ten years of operation. CILRT 1999 in NPP Krsko was completely performed following regulation of 10CFR50 App. J Option A and ANSI/ANS 56.8-1987. The main goal of CILRT is to prove that the leakage of containment pathways and wall structures are within limits prescribed in Technical Specifications by pressurization of containment building above peak accident pressure Pa and measuring the mass changes of air using Ideal Gas Law.(author)

  16. Neutron doze distribution in capsules for surveillance of radiation embrittlement of pressure vessel in Krsko nuclear power plant; Porazdelitev nevtronske doze v sondah za kontrolo povecanja krhkosri tlacne posode JE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Najzer, M; Remec, I; Kodeli, I [Institut Jozef Stefan, Ljubljana (Yugoslavia)

    1984-07-01

    Calculation of neutron fluence and spectrum distribution in the capsule with samples for radiation embrittlement of PWR pressure vessel surveillance program of Krsko nuclear power plant is presented. Two dimensional computer code DOT 3 has been used and neutron cross sections were taken from DLC-2D library. result is that fluence magnitude in the capsules changes for up to 70%, so when evaluating results of mechanical tests of samples it is necessary to take into account actual position of samples within the capsule. (author)

  17. The application of model with lumped parameters for transient condition analyses of NPP; Primena modela sa koncentrisanim parametrima za analize pelaznih stanja nukleane elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Stankovic, B [Institut GOSA, Beograd (Yugoslavia); Stevanovic, V [Masinski fakultet, Beograd (Yugoslavia)

    1985-07-01

    The transient behaviour of NPP Krsko during the accident of pressurizer spray valve stuck open has been simulated y lumped parameters model of the PWR coolant system components, developed at the faculty of Mechanical Engineering, University of Belgrade. The elementary volumes which are characterised by the process and state parameters, and by junctions which are characterised by the geometrical and flow parameters are basic structure of physical model. The process parameters obtained by the model RESI, show qualitative agreement with the measured valves, in a degree in which the actions of reactor safety engineered system and emergency core cooling system are adequately modelled; in spite of the elementary physical model structure and only the modelling of thermal process in reactor core and equilibrium conditions of pressurizer and steam generator. The pressurizer pressure and liquid level predicted by the non-equilibrium pressurizer model SOP show good agreement until the HIPS (high pressure pumps) is activated. (author)

  18. Determination of BEACON Coupling Coefficients using data from Xenon transient

    International Nuclear Information System (INIS)

    Bozic, M.; Kurincic, B.

    2007-01-01

    NEK uses BEACO TM code (BEACO TM - Westinghouse Best Estimate Analyzer for Core Operating Nuclear) for core monitoring, analysis and core behaviour prediction. Coupling Coefficients determine relationship between core response and excore instrumentation. Measured power distribution using incore moveable detectors during Xenon transient with sufficient power axial offset change is the most important data for further analysis. Classic methodology and BEACO TM Conservative methodology using established Coupling Coefficients are compared on NPP Krsko case. BEACON TM Conservative methodology with predefined Coupling Coefficients is used as a surveillance tool for verification of relationship between core and excore instrumentation during power operation. (author)

  19. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  20. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  1. Safety Analysis Report for Ignalina NPP

    International Nuclear Information System (INIS)

    Negrivoda, G.

    1997-01-01

    In December 1994 an agreement was signed between the European Bank for Reconstruction and Development and the Republic of Lithuania for the grant of 32.86 MECU for the safety Improvement at Ignalina NPP. One of the conditions for the provision of the grant, was a requirement for an in-depth analysis of the safety level at Ignalina NPP in the scope and according to the standards acceptable for a western nuclear power plant, and to publish a Safety Analysis Report (SAR). The report should investigate and analyze any factor that could limit a safe operation of the plant, and provide recommendations for actual safety improvements. According to the agreement, Lithuania had to finalize the SAR until 31 December, 1995. The bank has also organized and financed investigation of safety at Ignalina NPP and preparation of the SAR. EBRD made an agreement with Sweden's Vattenfall, which subcontracted well-known companies from Canada, USA, Germany, etc., and also the Russian Research and Development Institute of Power Engineering (NIKIET), reactor designer of Ignalina NPP. The SAR is a very comprehensive document and contains about 8000 pages of text, diagrams and tables. The main findings of the SAR are provided in the article. A large number of discrepancies with modern rules and western practices was detected, but they were not proved to be serious enough to require reactors shutdown. Based on the recommendations of the SAR Ignalina NPP has worked out Safety Improvement Program No. 2 (SIP-2), which is planned for three years and will cost 486 MLT. (author)

  2. PTS assessment - The basis of life time evaluation at NPP Paks

    International Nuclear Information System (INIS)

    Elter, J.; Oszwald, F.; Ratkay, S.; Fekete, T.; Gillemot, F.; Marothy, L.

    1997-01-01

    Plant specific PTS analysis at NPP Paks was performed in the frame of the AGNES (Advanced General New Evaluation of Safety) project. NPP Paks belongs to the second generation of the WWER-440/213 NPP-s. To verify the safety during transient events and predict the lifetime of the RPV-s several transient cases have been analyzed. The paper summarizes: The general scheme elaborated for the assessment; the safety philosophy used; the applied and available codes and methods; the ongoing and planned developments. (author). 8 refs, 3 figs, 1 tab

  3. PTS assessment - The basis of life time evaluation at NPP Paks

    Energy Technology Data Exchange (ETDEWEB)

    Elter, J; Oszwald, F; Ratkay, S [NPP Paks (Hungary); Fekete, T; Gillemot, F; Marothy, L [Atomic Energy Research Inst., Budapest (Hungary)

    1997-09-01

    Plant specific PTS analysis at NPP Paks was performed in the frame of the AGNES (Advanced General New Evaluation of Safety) project. NPP Paks belongs to the second generation of the WWER-440/213 NPP-s. To verify the safety during transient events and predict the lifetime of the RPV-s several transient cases have been analyzed. The paper summarizes: The general scheme elaborated for the assessment; the safety philosophy used; the applied and available codes and methods; the ongoing and planned developments. (author). 8 refs, 3 figs, 1 tab.

  4. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  5. Public opinion concerning completion of Khmelnitsky-2 and Rovno-4 NPP's construction for compensation of Chernobyl NPP shut-down

    International Nuclear Information System (INIS)

    Litvins'kij, L.L.; Novos'olov, G.M.; Majstrenko, O.V.; Sazonov, G.V.; Gryin, L.

    2001-01-01

    Interrogation of representation from non-government organizations and private persons from 46 countries about their opinion on completion of two NPP's construction revealed many comments about environmental effects, safety and economic aspects. These comments are analyzed by specialists

  6. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  7. Two managerial grids in NPP

    International Nuclear Information System (INIS)

    Zhao Hui

    2012-01-01

    Today, the nuclear power corporation (NPC) enjoys the profit of LCEP (the low carbon economic policy). at the same time, they also enduring more and more pressure. For example, the partner competition or the NPP potential occupational risk . The efficient counterplot of risk is the self-ability cultivation. It is essential to research the NPP managerial flow. The nuclear power plant (NPP) unit is a carrier of the NPC enterprise management system, and has taken on a new look 'pull one portion then the whole moving'. The NPP has three systematical characters, the security responsibility center, the man-machine system and the input-output system. The manufacturing system and the enterprise management system are the great constituents of the NPP managerial flows. Means of systems analysis, we can find out the truth of the NPP running interface. In CHINA, there are many operating experiences near 20 years. It indicates that the NPP manufacturing system and the enterprise system are the roots of the nuclear power corporation, the core of the all NPP systems must be based on it. So the ability cultivation is the work core to NPP. It is reliably to ensure the NPP to be up against problems, for instance, the security duty, the costing control and the man-machine system running harmoniously. This paper introduces the NPP managerial flow and the present state of QNPC, also come up with a proposal to refer for the NPC development actions of collective measure, specialization, standardization, fine. (author)

  8. Implementation of procedures to NPP Krsko INTRANEK

    International Nuclear Information System (INIS)

    Gradisar, D.; Krajnc, M.; Kocnar, R.; Spiler, J.

    1999-01-01

    Part of NEK documentation has already been presented on NEK Intranet such as USAR, Technical Specifications, QA Plan as well as some frequently used series of drawings. At the time being the process of presentation of all procedures (thereinafter INTRANEK procedures) is in progress. The purpose of this project is the presentation of 1600 procedures with average size of 30 pages what is more than 48000 pages altogether. ADOBE PDF (Portable Document Format) has been chosen as the most suitable format for the presentation of procedures on INTRANEK. PDF format meets the following criteria: the outlook of a document page is always the same as an original one and cannot be changed without control. In addition to this, full text search is available as well as easy jump from procedure to procedure. Some changes of working process on internal procedures have to be made before the project start, which determine the responsibility of individual users in the process. The work flow, which enables easy daily maintenance, has been prepared, the rules of both procedure numbering as well as folder contents/name have been set and the server selected. The project was managed and implemented with the extensive use of compute-aided management, document distribution and control, databases, electronics mail and Intranet tools. The results of practical implementation of NEK procedures and our experience with INTRANEK are presented in this paper.(author)

  9. Chernobyl NPP decommissioning efforts - Past, Present and Future. Decommissioning Efforts on Chernobyl NPP site - Past, Present

    International Nuclear Information System (INIS)

    Kuchinskiy, V.

    2017-01-01

    Two unique large-scale projects are underway at the moment within the Chernobyl - Exclusion zone - Shelter object transformation into ecologically safe system and the decommissioning of 3 Chernobyl NPP Units. As a result of beyond design accident in 1986 the entire territory of the industrial site and facilities located on it was heavily contaminated. Priority measures were carried out at the damaged Unit under very difficult conditions to reduce the accident consequences and works to ensure nuclear and radiation safety are continuous, and the Unit four in 1986 was transformed into the Shelter object. Currently, works at the Shelter object are in progress. Under assistance of the International Community new protective construction was built above the existing Shelter object - New Safe Confinement, which will ensure the SO Safety for the long term - within up to 100 years. The second major project is the simultaneous decommissioning of Chernobyl NPP Units 1, 2 and 3. Currently existing Chernobyl NPP decommissioning Strategy has been continuously improved starting from the Concept of 1992. Over the years the following was analyzed and taken into account: the results of numerous research and development works, international experience in decommissioning, IAEA recommendations, comments and suggestions from the governmental and regulatory bodies in the fields of nuclear energy use and radioactive waste management. In 2008 the final decommissioning strategy option for Chernobyl NPP was approved, that was deferred gradual dismantling (SAFSTOR). In accordance with this strategy, decommissioning will be carried out in 3 stages (Final Shutdown and Preservation, Safe Enclosure, Dismantling). The SAFSTOR strategy stipulates: -) the preservation of the reactor, the primary circuit and the reactor compartment equipment; -) the dismantling of the equipment external in relation to the reactor; -) the safe enclosure (under the supervision); -) the gradual dismantling of the primary

  10. National debate (Slovenia)

    International Nuclear Information System (INIS)

    Pecnik, Maks; Veselic, Miran

    2003-01-01

    The Governmental policies in the area of the safety of spent fuel management and of the safety of radioactive waste management are set in comprehensive nuclear legislation comprising of international agreements, domestic laws and regulations. In addition the government prepared several documents pertinent to the policy in the area of radioactive waste management. The most important are: a Strategy of Energy Use and Supply of Slovenia, adopted by the Slovene Parliament in 1996; a Decommissioning Plan for the Krsko NPP, produced and approved by the Government in September 1996; a Strategy for Long-term Spent Fuel Management,adopted by the Slovenian Government in 1996. The Strategy on Low and Intermediate Level Waste Management has been prepared by the Agency for Radioactive Waste Management. The document has been submitted to the Government for approval. According to the new Act on Ionising Radiation Protection and Nuclear Safety (2002) the National programme for radioactive waste and spent fuel management shall be adopted by the Parliament as a part of the national programme for the protection of the environment pursuant to the regulations on environmental protection. This National programme will substitute The Strategy for Long-term Spent Fuel Management and The Strategy on Low and Intermediate Level Waste Management. The technical groundwork for the National programme for radioactive waste and spent fuel management, together with a detailed description of the measures relating to the reduction of the occurrence of radioactive waste, to the treatment thereof prior to disposal and to its disposal, and the measures relating to the treatment and disposal of spent fuel, shall be carried out and communicated to the ministry competent for the environment by the ARAO Agency. The operative programmes within the national programme of the radioactive waste and spent fuel management shall be drawn up by the ARAO Agency adopted by the Government. The operative programmes shall

  11. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  12. The shift of the public opinion to the favour of nuclear energy in Slovenia

    International Nuclear Information System (INIS)

    Lengar, I.; Nemec, T.

    2001-01-01

    In late August and early September of 1999, nuclear energy topics occupied a central place in the Slovenian media because of the transport of two new steam generators to the Krsko nuclear power plant, and also due to the protest action of an Austrian Greenpeace group. Before these events, the public opinion in Slovenia was not in favour or nuclear energy and Greenpeace had a good reputation. In September it has lost much credibility because of their clumsy action of protest, and in just one month this caused a shift of public opinion in Slovenia towards support of Slovenia's only nuclear power plant. The Greenpeace protest action occurred during the transport of the two new steam generators to Krsko. By replacement of the old steam generators the operation of the Krsko NPP will be extended until 2023. The transport envoy travelled during the first half of September '99 across a considerable part of Slovene territory, passing by the capital of Ljubljana. (authors)

  13. Public Opinion shifts to the favour of nuclear energy due to steam generator transport

    International Nuclear Information System (INIS)

    Lengar, I.; Nemec, T.

    2000-01-01

    In late August and early September of 1999, nuclear energy topics occupied a central place in the Slovenian media because of the transport of two new steam generators to the Krsko nuclear power plant, and also due to the protest action of an Austrian Green peace group. Before these events, the public opinion in Slovenia was not in favour or nuclear energy ;and Green peace had a good reputation. In September it has lost much credibility because of their clumsy :action of protest, and in just one month this caused a shift of public opinion in Slovenia towards support of Slovenian's only nuclear power plant. The Green peace protest action occurred during the transport of the two new steam generators to Krsko. By replacement of the old steam generators the operation of the Krsko NPP will be extended until 2023. The transport envoy travelled during the first half of September '99 across a considerable part of Slovene territory, passing by the capital of Ljubljana. (authors)

  14. NPOESS Preparatory Project (NPP) Science Overview

    Science.gov (United States)

    Butler, James J.

    2011-01-01

    NPP Instruments are: (1) well understood thanks to instrument comprehensive test, characterization and calibration programs. (2) Government team ready for October 25 launch followed by instrument activation and Intensive Calibration/Validation (ICV). NPP Data Products preliminary work includes: (1) JPSS Center for Satellite Applications and Research (STAR) team ready to support NPP ICV and operational data products. (2) NASA NPP science team ready to support NPP ICV and EOS data continuity.

  15. NPP life management (abstracts)

    International Nuclear Information System (INIS)

    Litvinskij, L.L.; Barbashev, S.V.

    2002-01-01

    Abstracts of the papers presented at the International conference of the Ukrainian Nuclear Society 'NPP Life Management'. The following problems are considered: modernization of the NPP; NPP life management; waste and spent nuclear fuel management; decommissioning issues; control systems (including radiation and ecological control systems); information and control systems; legal and regulatory framework. State nuclear regulatory control; PR in nuclear power; training of personnel; economics of nuclear power engineering

  16. The psychological background about human error and safety in NPP

    International Nuclear Information System (INIS)

    Zhang Li

    1992-01-01

    A human error is one of the factors which cause an accident in NPP. The in-situ psychological background plays an important role in inducing it. The author analyzes the structure of one's psychological background when one is at work, and gives a few examples of typical psychological background resulting in human errors. Finally it points out that the fundamental way to eliminate the unfavourable psychological background of safety production is to establish the safety culture in NPP along with its characteristics

  17. Power feedback effects in the LEM code

    International Nuclear Information System (INIS)

    Kromar, M.

    1999-01-01

    The nodal diffusion code LEM has been extended with the power feedback option. Thermohydraulic and neutronic coupling is covered with the Reactivity Coefficient Method. Presented are results of the code testing. Verification is done on the typical non-uprated NPP Krsko reload cycles. Results show that the code fulfill objectives arising in the process of reactor core analysis.(author)

  18. On the article of V. A. Mashin 'Computerized systems of NPP operators support. (Psychological problems)'

    International Nuclear Information System (INIS)

    Prushinskij, B.Ya.

    1995-01-01

    Basic aspects of V.A. Mashin's article on NPP operator support computerized systems and problems of man-machine interrelation are analyzed. Sharing in the significant degree Mashin's point of view the author of this article considers that the most important aspects of this problem consist in dividing the responsibility for NPP safe operation between all participants of the NPP creation and operation and in the area of practical experience in assuring control functions reliability

  19. Radiation protection in Bohunice NPP. Description of present status

    International Nuclear Information System (INIS)

    Dobis, L.

    2001-01-01

    Radiation protection (RP) at Bohunice NPP has reached the high international standard. The fact was approved by several independent international missions (OSART , WANO, WENRA, ...). A lot of modifications have been done in order to improve the standard of radiation protection. All the BSS requirements have been implemented into the plant regulations before the State Law No 290/1996 and 470/2000 came into the force. Internal audits are regularly performed at NPP in order to reveal potential deficiencies. In 2001 there were 4 such audits focused on quality assurance, software operation, LBB concept and limits and condition of safe operation. State Health Institute, the regulatory body in the radiation protection, performs the inspection at least ones a month. Good relationship with the inspectors of State Health Institute also contributes to the safe operation of the NPP. There were not any radiation accident. All anomalies or radiation events are investigated at a plant level. The results of root cause analysis and proposal of corrective actions are provided to IAEA and WANO databases for the distribution. The Radiation protection department of Bohunice NPP cooperates with the other Czech and Slovak NPPs. Regular meetings on radiation protection and lately also on emergency preparedness are organized. The cooperation is excellent. Occupational exposure is reviewed also with respect of ISOE data. Bohunice NPP (even with high dose burden caused by reconstruction of V1 NPP) can be found in the first half of world PWR speaking about the collective exposure per reactor. V2 NPP itself reaches the lowest collective exposure in the world. All doses are below the limits and kept ALARA. ALARA system has been established already in 1997 at Bohunice NPP and its results are obvious for example looking at dose results during the reconstruction works at V1 NPP. The operation of Bohunice NPP has negligible influence to its surroundings. The values of gas and liquid effluents move

  20. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  1. Technical Characteristics of the Process Information System - Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Mandic, D.; Smolej, M.

    1998-01-01

    process Information System (PIS) of Nuclear Power Plant Krsko (NEK) is newly installed distributed and redundant process computer system which was built in NEK (Phase I: 1991-1995) to integrate the following main functions: - Signal Data Acquisition from the technological processes and environment - Implementation of the basic SCADA functions on the real time process signals data base - Execution of complex plant specific application programs - Advanced MMI (Man Machine Interface) features for users in MCR - Process data transfer to other than Main Control Room (MCR) locations - Process data archiving and capability to retrieve same data for future analysis PIS NEK architecture consists of three hierarchically interconnected hardware platforms: - PIS Level 1, DAS (Data Acquisition System) Level - PIS Level2, Level for MMI, application programs and process data archiving - PIS Level 3, Level for distribution of process data to remote users of PIS data. (author)

  2. Temperature and stress distribution in pressure vessel by the boundary element method

    International Nuclear Information System (INIS)

    Alujevic, A.; Apostolovic, D.

    1990-01-01

    The aim of this paper is to demonstrate the applicability of boundary element method for the solution of temperatures and thermal stresses in the body of reactor pressure vessel of the NPP Krsko . In addition to the theory of boundary elements for thermo-elastic continua (2D, 3D) results are given of a numerically evaluated meridional cross-section. (author)

  3. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  4. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2009-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  5. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2008-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  6. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  7. Yak experience at Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Mandic, D.

    2000-01-01

    In Sept. 1998, Nuclear Power Plant Krsko started Y2K (Year 2000) Readiness Assessment Program and implementation of the Y2K-NEK Project (NEK Nuklearna Elektrana Kriko). Y2K-NEK Project and the term N EK Year 2000 Readiness Assessment Program'' applies to software, or software based system or interface, whose failure due to the Y2K problem would prevent the performance of the safety function of a structure, system, or component. This project also applies to any software, or software based system or interface, whose failure due to the Y2K problem would degrade, impair, or prevent operability of the nuclear facility. It is intended to supplement and use existing NEK procedures used for software quality control, configuration management and problem reporting. The main guideline and method definition documents for Y2K-NEK Project were: NEI/NUSMG 97-07: Nuclear Utility Year 2000 Readiness (October 1997), and NEI/NUSMG 98-07; Nuclear Utility Year 2000 Readiness Contingency Planning (Aug. 1998). This paper presents project Y2K implementation experience and post Y2K transition analysis of the plant hardware/software systems behavior compared to the expected systems behavior and expected-planned scenarios based on the results of the Y2K Readiness Assessment, implemented remediations and Y2K Contingency Planning. (author)

  8. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  9. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  10. Methods and means for improving the man-machine systems for NPP control

    International Nuclear Information System (INIS)

    Konstantinov, L.V.; Rakitin, I.D.

    1984-01-01

    Consideration is being given to the role of ''human factors'' and the ways of improving the man-machine interaction in NPP control and safety systems (CSS). Simulators and tAaining equipment on the basis of dynamic power unit models used for training and improving skill of NPP operatoAs, as well as for mastering collective actions of personnel under accidental conditions are considered in detail. The most perfect program complexes for fast NPP diagnostics and theiA pealization in the Federal Republic of Germany, Japan, Canada, the USA and other countries are described. A special attention is paid to the means and methods of videoterminal dialogue operator interaction with an object both in normal and extreme situations. It is noted that the problems of the man-machine interaction have become the subject of study only in the end of 70s after analyzing the causes of the Three-Mile-Island accident (USA). Publications dealing with the development of perspective control rooms for NPP were analyzed. It was concluded that radical changes both in equipment and principles of organizing the personnel activity will take place in the nearest future. They will be based on the progress in creating dialogue means and computers of the fourth and fifth generations as well as on engineering and psychological and technical aspects of designing

  11. Modernization programme at Dukovany NPP

    International Nuclear Information System (INIS)

    Trnka, M.

    2000-01-01

    The main goal of each NPP is to produce electricity safely, economically and without influence to environment. For Dukovany NPP it means to upgrade all documentation and perform the Equipment Upgrading Programme. All these activities are time and money consuming and therefore the determination of priority of all items was necessary. In the presentation there are mentioned some important changes in documentation, results of PSA studies and reason for Equipment Upgrading Programme performance. It was selected the most important item from the list of Equipment Upgrading Programme the I and C upgrading. Management has decided that Dukovany NPP will become among the best NPPs with WWER type of reactor. It seems this decision is the best way how to extend lifetime of the NPP. (author)

  12. Introduction of the commercial grade dedication into Nuclear Power Plant Krsko (NEK) procurement process

    International Nuclear Information System (INIS)

    Heruc, Z.; Gajsak, Z.; Nikpalj, R.

    1996-01-01

    NEK management has undertaken a set of actions to improve the ability to provide equipment, spare parts and material needed to support operation and maintenance of the Krsko plant. These actions are necessary due primarily to the fact that NEK is more and more confronted (increasing trend) with the issue that suppliers of safety-related equipment and spare parts have decided not to pursue the nuclear portion of their business, incl. specific QA systems and qualifications. The purchase orders imposing these requirements are no longer accepted. In order to continue to obtain the necessary materials at the required quality level, a 'Commercial Grade Item' (CGI) procurement and dedication program has been developed based on similar practices in USA. (author)

  13. Emergency preparedness at Ignalina NPP

    International Nuclear Information System (INIS)

    Kairys, A.

    1998-01-01

    Brief review of Ignalina NPP safety upgrading and personnel preparedness to act in cases of accidents is presented. Though great activities are performed in enhancing the plant operation safety, the Ignalina NPP management pays a lot of attention to preparedness for emergency elimination and take measures to stop emergency spreading. A new Ignalina NPP emergency preparedness plan was drawn up and became operational. It is the main document to carry out organizational, technical, medical, evacuation and other activities to protect plant personnel, population, the plant and the environment from accident consequences. Great assistance was rendered by Swedish experts in drawing this new emergency preparedness plan. The plan consists of 3 parts: general part, operative part and appendixes. The plan is applied to the Ignalina NPP personnel, Special and Fire Brigade and also to other contractor organizations personnel carrying out works at Ignalina NPP. There are set the following emergency classes: incident, emergency situation, alert, local emergency, general emergency. Separate intervention level corresponds to each emergency class. Overview of personnel training to act in case of an emergency is also presented

  14. New approach of second Romanian NPP siting

    International Nuclear Information System (INIS)

    Mauna, Traian

    2010-01-01

    The NPP sitting studies in Romania began before 1975. The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units. Gained the experience from Cernavoda NPP sitting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the NPP Cernavoda project to the new parameters of close water cooling circuit and hard less and no rock foundation strata. The studies were carrying out in different stages on the inner rivers Olt, Mures, Somes in Transylvania historical region. This paper tries to reconsider shortly the old analysis according to the last IAEA Safety Standards, taking into account the new NPP generation requirement. Paper is focused on geological aspects and other local sites characteristics. (authors)

  15. Transport of replaced steam generators from Port of Koper to Krsko (Slovenia)

    International Nuclear Information System (INIS)

    Kovacic, S.

    2000-01-01

    All activities regarding the transport preparation as well as preparation of the route between the Port of Koper and Krsko Site were completed within the period of 12 month. Transport configuration had been designed as a self supporting structure where two 12 axes trailers presented rolling cars. Total mass of aforesaid configuration was about 666 tons, where pulling and pushing tractors were not included. Major observations were granted to concrete structures that would be crossed during the transport. It is our pleasure to conclude, that respected design directions relevant for concrete structures (SODOC 1.0) enable rather quality bases regarding load capacity and taking over extremely heavy loads such as transport configuration itself. In manner to achieve a required safety factor and protection against permanent deformations on structures, many static analyses had been made by design engineers. (author)

  16. Implications of the Croatian Spent Fuel and Radioactive Waste Strategy

    International Nuclear Information System (INIS)

    Lokner, V.; Levanat, I.

    2012-01-01

    Croatian Government approved its national Radioactive waste and Spent Fuel Strategy as a part of the accession process to EU in July 2009 enabling acquisition of adequate administrative capacity by the time of accession to properly implement and enforce the relevant legislation in all areas related to nuclear safety. Strategy was formulated in line with the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. In particular, the strategy was approved to ensure that sufficient qualified staff and adequate financial services are available to support the safety of facilities for spent fuel and radioactive waste management generated by Krsko NPP during their operating lifetime and from decommissioning. Following are statements from the Croatian strategy that are relevant for Croatian position regarding capacity building for storage and disposal of LILW and SF. To be able to fulfill the obligations assumed, Croatia needs to do the following (Strategy Section 3.3): reach an agreement with Slovenia by 2013 at the latest regarding the location of objects for storing LILW; should no such agreement be reached, Croatia is to initiate preparations for assuming its half of operational LILW and for third-country export thereof, or for storing the LILW on Croatian territory, whilst also gradually assuming the part of LILW created from decommissioning; reach an agreement with Slovenia by 2018 at the latest regarding the location of a common SF storage; should no such agreement be reached, initiate preparations for assuming a third-country export of SF, or for storing half of SF on Croatian territory. This paper discusses the Strategy aims in the light of noticeable delay of 2nd revision of the Program of NPP Krsko Decommissioning and SF andLILW Disposal, the status of the planned Slovenian national repository on Vrbina site and the prospects of its use for joint Croatian/Slovenian LILW disposal - all in the context of as yet

  17. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  18. The impact of the Ignalina NPP and Visaginas town on the economy of the region

    International Nuclear Information System (INIS)

    Brazhukiene, I.; Krauchiunas, E.; Burneika, D.

    1998-01-01

    The present article is devoted to the influence of Visaginas town and Ignalina NPP on economy in the surrounding region. Preliminary the region includes the Ignalina and Zarasai administrative districts. However, these boundaries are relative. The analysis of the influence of Visaginas town and Ignalina NPP on the economy in the region revealed that such an influence exists, however, it is not as distinct as could have been expected from the town of such size. The influence on economy of the region includes influence on markets of economic resources (labour force and real estate markets were analyzed), influence on consumption market, influence on industries and services (the appearance of new manufacturing enterprises in the town itself, where, excluding the NPP, the economic sector is rather poorly developed, and the impact of the town on the enterprises of considered region were analyzed) and the influence on conditions for investment in the region. After the building Ignalina NPP and Visaginas the distribution of surrounding forests into protective categories has changed. The Ignalina NPP and Visaginas directly posses 1250 ha of forests. The influence of the town and Ignalina NPP on the enterprises of industry of considered region is important because Visaginas serving as a good market for various manufacturing enterprises makes it possible for them to maintain a certain economic level and have better profits. This aspect is extremely important for food and light industries. The extraction and building industry as well as many other branches of industries were most highly influenced during the building works of NPP. At present the building works meet only the current requirements of NPP and so they are not very intensive. The influence on consumption markets is more noticeable. With the building of Visaginas town consumption market of the region increased more than three times. The demand in the region increased as well as supply. The incomes of people in the

  19. Ignalina NPP: living and working conditions

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The conference was devoted to discuss the social problems related with the operation of Ignalina NPP. The main topics are the following: analysis of public opinion of surrounding region of Ignalina NPP including neighbouring Daugavpils district in Latvia, environment impact evaluation of Daugavpils district, assessment of the influence of Ignalina NPP operation to the development of business in the region, investigation of problems of Visaginas town - residence of Ignalina NPP personnel. The specificity of Visaginas (former Sniechkus) is defined by the majority of non-native Lithuanians living there. Cultural transformation and political organization of the region were surveyed as well

  20. Expert software for accident identification

    International Nuclear Information System (INIS)

    Dobnikar, M.; Nemec, T.; Muehleisen, A.

    2003-01-01

    Each type of an accident in a Nuclear Power Plant (NPP) causes immediately after the start of the accident variations of physical parameters that are typical for that type of the accident thus enabling its identification. Examples of these parameter are: decrease of reactor coolant system pressure, increase of radiation level in the containment, increase of pressure in the containment. An expert software enabling a fast preliminary identification of the type of the accident in Krsko NPP has been developed. As input data selected typical parameters from Emergency Response Data System (ERDS) of the Krsko NPP are used. Based on these parameters the expert software identifies the type of the accident and also provides the user with appropriate references (past analyses and other documentation of such an accident). The expert software is to be used as a support tool by an expert team that forms in case of an emergency at Slovenian Nuclear Safety Administration (SNSA) with the task to determine the cause of the accident, its most probable scenario and the source term. The expert software should provide initial identification of the event, while the final one is still to be made after appropriate assessment of the event by the expert group considering possibility of non-typical events, multiple causes, initial conditions, influences of operators' actions etc. The expert software can be also used as an educational/training tool and even as a simple database of available accident analyses. (author)

  1. Reliability analysis of protection systems in NPP applying fault-tree analysis method

    International Nuclear Information System (INIS)

    Bokor, J.; Gaspar, P.; Hetthessy, J.; Szabo, G.

    1998-01-01

    This paper demonstrates the applicability and limits of dependability analysis in nuclear power plants (NPPS) based on the reactor protection refurbishment project (RRP) in NPP Paks. This paper illustrates case studies from the reliability analysis for NPP Paks. It also investigates the solutions for the connection between the data acquisition and subsystem control units (TSs) and the voter units (VTs), it analyzes the influence of the voting in the VT computer level, it studies the effects of the testing procedures to the dependability parameters. (author)

  2. Calculation of behaviour of the Juragua NPP containment with code TRACOV/MOD1

    International Nuclear Information System (INIS)

    Castillo Alvarez, J.; Valle Cepero, R.; Luis, J.; San Roman, J.C.; Pomier, L.

    1996-01-01

    The containment of Juragua NPP has some unique features, which differ from the rest of the PWR reactors design. Those features impose additional requirements for its numerical simulation. In this paper is analyzed the behaviour of the Juragua NPP containment during accident situation with double ended break of the primary pipelines with flow in both direction using the code TRACOV/MOD1. The results are compared with obtained by the designer. The main restrictions of the code are identified

  3. Nuklearna Elektrarna Krsko: managing technical documentation for the 'rightsized' 90's and beyond

    International Nuclear Information System (INIS)

    Gradisar, D.; Freeland, K.R.

    1996-01-01

    Nuklearna Elektrarna Krsko (NEK) was constructed as a turnkey plant, entering commercial service in 1981. NEK operates the plant with a unique management philosophy which has adapted well to the demands of today's business environment. Contributing to this success has been the NEK Management Information System (MIS) that has assisted NEK in 'making more with less'. A key element of the MIS is the Technical Document system, which includes the DCM (Document Control Module) and QRM (Quality Records Management), enabling the successful retrofit of the existing document management and 'turnkey' plant records environment to a new, thoroughly integrated system controlling plant operation and configuration management. The system integrates the Engineering Equipment and Configuration Management data systems, providing immediate, realtime cross-reference of plant equipment and plant modifications with technical documentation. (author)

  4. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  5. Selection of NPP for Kazakhstan

    International Nuclear Information System (INIS)

    Zhotabaev, Zh.R.

    2003-01-01

    Commercial NPP for Kazakhstan should to meet to several main requirements: 1). Safety operation (accident probability not more than 10 -6 1/p. year). 2). High efficiency > 40 %. 3). Possibility of use for high-temperature chemistry and hydrogen production. 4). Possibility for manufacturing of considerable part of equipment in Kazakhstan. 5). Possibility for fuel production and reprocessing in Kazakhstan. 6). Independence from existence of large water-supply sources. Comparative analysis of several NPP with different reactors (WWR-1000, Candu, BREST, VG-400; graphite molten salt reactor) shows that NPP with the graphite molten salt reactor meets to all above requirements, but hydrogen production it is possible by more complete 4-stage technology, since coolant temperature is 800 Deg. C. The principle advantage is possibility of manufacturing of main equipment and fuel in Kazakhstan that reduce the cost of NPP construction and operation

  6. A brief overview of Ignalina NPP safety issues

    International Nuclear Information System (INIS)

    Almenas, K.; Ushpuras, E.

    1998-01-01

    A description of the safety of Ignalina NPP in a very popular form is presented. Answers to the most frequently recurring questions concerning the Ignalina NPP are provided based on recently completed international studies. Questions are like these: can a similar accident to the one that occurred in Chernobyl take place at Ignalina NPP, does the Ignalina NPP have a containment, what are the probabilities and potential consequences of accidents, etc. The brochure contains a short description of Ignalina NPP safety improvement programs

  7. Introduction of the commercial grade dedication into Nuclear Power Plant Krsko (NEK) procurement process

    International Nuclear Information System (INIS)

    Heruc, Z.; Gajsak, Z.; Nikpalj, R.

    1996-01-01

    NEK management has undertaken a set of actions to improve the ability to provide equipment, spare parts and material needed to support operation and maintenance of the Krsko plant. These actions are necessary due primarily to the fact that NEK is more and more confronted (increasing trend) with the issue that suppliers of safety-related equipment and spare parts have decided not to pursue the nuclear portion of their business, incl. specific QA systems and qualifications. The purchase orders imposing these requirements are no longer accepted. In order to continue to obtain the necessary materials at the required quality level, a 'Commercial Grade Item' (CGI) procurement and dedication program has been developed based on similar practices in the USA. (author)

  8. Computer security of NPP instrumentation and control systems: categorization

    International Nuclear Information System (INIS)

    Klevtsov, A.L.; Simonov, A.A.; Trubchaninov, S.A.

    2016-01-01

    The paper is devoted to studying categorization of NPP instrumentation and control (I&C) systems from the point of view of computer security and to consideration of the computer security levels and zones used by the International Atomic Energy Agency (IAEA). The paper also describes the computer security degrees and zones regulated by the International Electrotechnical Commission (IEC) standard. The computer security categorization of the systems used by the U.S. Nuclear Regulatory Commission (NRC) is presented. The experts analyzed the main differences in I&C systems computer security categorization accepted by the IAEA, IEC and U.S. NRC. The approaches to categorization that should be advisably used in Ukraine during the development of regulation on NPP I&C systems computer security are proposed in the paper

  9. The dependence level analysis between the human actions in NPP Operation

    International Nuclear Information System (INIS)

    Farcasiu, M.; Nitoi, M.; Apostol, M.; Florescu, G.; Prisecaru, Ilie

    2009-01-01

    The Human Reliability Analysis (HRA) is an important method in Probabilistic Safety Assessment (PSA) studies and offers desirability for concrete improvement of the man - machine - organization interfaces, reliability and safety. An important step in HRA is the dependence level analysis between the human actions performed by the same person or between the actions performed by different persons, step in quantitative analysis of the human errors probabilities. The purpose of this paper is to develop a model to analyze the dependence level between human actions for Nuclear Power Plant (NPP) operation. The model estimates the conditional human error probabilities (CHEP) and joint human error probabilities (JHEP). The achieved sensitivity analyses determine human performance sensibility to systematic variations for dependence level between human actions. The human error probabilities estimated in this paper are adequate values for integration both in HRA and in PSA realized for NPP. This type of analysis helps in finding and analyzing the ways of reducing the likelihood of human errors, so that the impact of human factor to systems availability, reliability and safety can be realistically estimated. In order to demonstrate the usability of this model an analysis is performed upon the dependences between the necessary human actions in mitigating the consequences of LOCA events, particularly for the case of Cernavoda NPP. (authors)

  10. Assessment of multi-version NPP I and C systems safety. Metric-based approach, technique and tool

    International Nuclear Information System (INIS)

    Kharchenko, Vyacheslav; Volkovoy, Andrey; Bakhmach, Eugenii; Siora, Alexander; Duzhyi, Vyacheslav

    2011-01-01

    The challenges related to problem of assessment of actual diversity level and evaluation of diversity-oriented NPP I and C systems safety are analyzed. There are risks of inaccurate assessment and problems of insufficient decreasing probability of CCFs. CCF probability of safety-critical systems may be essentially decreased due to application of several different types of diversity (multi-diversity). Different diversity types of FPGA-based NPP I and C systems, general approach and stages of diversity and safety assessment as a whole are described. Objectives of the report are: (a) analysis of the challenges caused by use of diversity approach in NPP I and C systems in context of FPGA and other modern technologies application; (b) development of multi-version NPP I and C systems assessment technique and tool based on check-list and metric-oriented approach; (c) case-study of the technique: assessment of multi-version FPGA-based NPP I and C developed by use of Radiy TM Platform. (author)

  11. Operation and maintenance of the RB reactor, Annual report for 1979

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Petronijevic, M.

    1979-01-01

    The annual report for 1979 includes the following: utilization of the RB reactor; accident analysis; dosimetry and radiation protection; description of the reactor equipment status; reactor staff; financial data. Six Annexes to this report are concerned with: scientific program orientation; producing the new safety report; maintenance of the reactor components and equipment; purchase of new equipment; financial report; and program for training the staff of the Krsko NPP

  12. Hydrogen behaviour in PWR containment evaluated with MAAP4.0.5

    International Nuclear Information System (INIS)

    Bilic-Zabric, T.; Basic, I.; Spiler, J.

    2004-01-01

    The possible impacts of the non-uniform hydrogen distribution and the consequent fast burning should be assessed in the light of newer research information on hydrogen management. The review should include the hydrogen source term, both for the in-vessel and ex-vessel period, and investigate the potential effects on the hydrogen management strategy. NPP Krsko will repeat MAAP 4.0.5 calculation for the most important Rx vessel failure sequences taken from Individual Plant Examination Project (with molten core-concrete interaction (MCCI) and with no MCCI) including wet cavity strategy. Mass and energy gases releases of analyzed sequences will be used to assess the non-uniform hydrogen distribution and the consequent fast burning by GOTHIC 7.1 (3-D).(author)

  13. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  14. Radioactive Waste Repositories and Incentives to Local Communities

    International Nuclear Information System (INIS)

    Knapp, A.; Medakovic, S.

    2008-01-01

    Public acceptance of radioactive waste (RW) repository depends on various and often community-specific factors. Although radiological risk from a properly constructed low and intermediate level waste (LILW) repository is practically negligible, routine safety considerations will favor low populated areas and therefore probably underdeveloped communities. Repository acceptance in such communities is more likely to be facilitated by prospective benefits to local economy, such as infrastructure development and increased employment, as well as by dedicated financial incentives to the community. Direct financial compensation to the local community for acceptance of the repository has been considered in some documents in countries experienced in RW management, but it has not become a widely accepted practice. In Croatia, a possibility for such compensation is mentioned in the land use plan in conjunction with the prospective RW repository site. In Slovenia, the government has already specified the annual amount of 2.33 million euro as a compensation for 'limited land use' to be shared by local communities in the vicinity of the planned LILW repository during its operation. Applicability of the Slovenian compensations to the prospective joint Slovenian-Croatian repository is not yet clear, at least in the aspect of joint funding. The joint Slovenian-Croatian Decommissioning and LILW and SF management program for NPP Krsko from 2004 did conservatively include the compensations into the repository cost estimates, but that might not be retained in subsequent revisions of the Program. According to the agreement between governments of Slovenia and Croatia on the Nuclear power plant Krsko, Croatian side has no obligations to participate in 'public expenditures' introduced after the agreement, as would be the case of community compensations for LILW repository in Slovenia. Before further decisions on joint NPP Krsko waste management are made, including the issue of LILW

  15. Risks for marine coastal ecosystems from anthropogenic loading in the Leningrad NPP environs

    International Nuclear Information System (INIS)

    Zimina, L.; Zimin, V.; Shchukina, T.; Pomiluiko, G.; Ryabova, V.

    1998-01-01

    Data on conditions and variations in phytoplankton, zooplankton and fish communities, chlorophyll 'a' and hydrochemical parameters in the coastal waters of Koporskaya Bay (cooling water body of the Leningrad NPP) were analyzed. The most significant anthropogenic factors issued from the Leningrad nuclear power plant activity are of non-radioactive character, as it was recognized during long-time (20 years) ecological monitoring. Main factors influenced ecosystem of the NPP cooling water body are thermal water discharge and nutrient outflows from the bay catchment area. (authors)

  16. Study on mid and long-term strategic plan formulation for newly-constructed NPP

    International Nuclear Information System (INIS)

    Song Lin

    2014-01-01

    Mid and Long-term strategic plan plays a key role for the management of a newly constructed nuclear power company. Among others, process, goals, and risk management, are the primary concerns during plan preparing. The article analyzed these three areas for Fuqing NPP, including the formulating process for the plan, the mid and long-term goal setting of the company, the major risk analysis and countermeasure selection therefore. Through that solutions and suggestions for strategic plan formulation were concluded for newly-constructed NPP. (author)

  17. Some problems of NPP personnel training

    International Nuclear Information System (INIS)

    Vajshnis, P.P.; Kumkov, L.P.; Omel'chuk, V.V.

    1984-01-01

    Shortcomings of NPP personnel training are discussed. Development of full-scale training systems is necessary for qualitative training operative personnel. Primary problems that should be necessarily solved for ensuring effective training NPP personnel are considered

  18. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  19. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  20. Preparation for Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Medeliene, D.

    2004-01-01

    Latest developments of atomic energy in Lithuania, works done to prepare Ignalina NPP for final shutdown and decommissioning are described. Information on decommissioning program for Ignalina NPP unit 1, decommissioning method, stages and funding is presented. Other topics: radiation protection, radioactive waste management and disposal. Key facts related to nuclear energy in Lithuania are listed

  1. Public opinion about nuclear energy 2001poll

    International Nuclear Information System (INIS)

    Stritar, A.; Istenic, R.

    2001-01-01

    In the Nuclear Training Centre in Ljubljana we are polling our visitors on a yearly basis. The visitors, mainly elementary and high school students, are polled before they listen to the lecture and visit the permanent exhibition. The attitude towards nuclear power remains favorable: 83,3% of polled population agrees with NPP Krsko operation until the end of its life cycle and 9,8% accept construction of another nuclear power plant in Slovenia.(author)

  2. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  3. External flood probabilistic safety analysis of a coastal NPP

    International Nuclear Information System (INIS)

    Pisharady, Ajai S.; Chakraborty, M.K.; Acharya, Sourav; Roshan, A.D.; Bishnoi, L.R.

    2015-01-01

    External events pose a definitive challenge to safety of NPP, solely due to their ability to induce common cause failures. Flooding incidents at Le Blayais NPP, France, Fort Calhoun NPP, USA and Fukushima Daiichi have pointed to the importance of external flooding as an important contributor to NPP risk. A methodology developed for external flood PSA of a coastal NPP vulnerable to flooding due to tsunami, cyclonic storm and intense local precipitation is presented in this paper. Different tasks for EFPSA has been identified along with general approach for completing each task

  4. The changing of land use and land management in Ignalina NPP region

    International Nuclear Information System (INIS)

    Milius, J.; Ribokas, G.

    1998-01-01

    The investigated locality (Ignalina NPP) represents territory of NPP and Visaginas town as well as agrarian territories of three former environs Dukshtas and Rimshe (Ignalina district) and Turmantas (Zarasai district). The changes of land, started with the beginning of construction works of NPP (1974) and are still taking place, are analyzed. The data on the land fund and current data of land reform agrarian services were used. The changes of the plots of farming lands in agrarian territories were preconditioned by the same factors which operated in other territories of hilly agrarian landscape. In the drained terrains the plots of farming lands increased, whereas, in other territories re naturalization processes set in resulting in the increase of the areas covered with forests and bushes which were not used for agricultural purposes. Thus, we may assert that the impact of the NPP itself on the change of the structure of farming lands in agrarian territories was minimal. It manifested not as a permanent process but as a spontaneous fact - a mechanical allotment of a plots of land for building the NPP and town itself. The comparison of the structure of farming lands at the moment of allotment with the data of 1995 revealed that during the mentioned period the farming land were completely destroyed (1003 ha of ploughed lands, 168 ha - grasslands, 180 ha - pastures). The forest area was reduced by 625 ha. The destroyed farming lands were occupied by territories under buildings (719 ha), artificial ground cover (159 ha), and high tension current lines (over 800 ha) which are absolutely unfit neither for agriculture nor forestry. Though the NPP and Visaginas town exerted no appreciable influence on the structure of farming lands in the surrounding territories they substantially changed the territory of NPP and Visaginas. The former wooded - agrarian landscape was replaced by an untypical for these places technical - urbanized landscape. This should be taken into

  5. Predisposal of Radioactive Waste from NPP 1000 MWe

    International Nuclear Information System (INIS)

    Suryantoro

    2007-01-01

    Predisposal of radioactive waste from NPP 1000 MW which was planned to be operated in 2016 has been conducted. In this study NPP applying PWR type was assumed. This assessment comprises all aspects of radioactive waste coming from NPP. One through cycle was chosen consequently no reprocessing step will be conducted. The assessment shows that technologically all radioactive waste treatment process rising from NPP operation has similarities to the existing radioactive waste process conducted by RWI which has lower scale of waste amount. (author)

  6. Operation safety at Ignalina NPP

    International Nuclear Information System (INIS)

    Zheltobriukh, G.

    1999-01-01

    An improvement of operational safety at Ignalina NPP covers: improvement of management structure and safety culture; symptom-based emergency operating procedures; staff training and full scope simulator; program of components ageing; metal inspection; improvement of fire safety. The first plan of Ignalina NPP Safety culture development for 1997 purposed to the SAR recommendation implementation was prepared and approved by the General Director

  7. Treatment of NPP wastes using vitrification

    International Nuclear Information System (INIS)

    Sobolev, I.A.; Lifanov, F.A.; Stefanovsky, S.V.; Kobelev, A.P.; Savkin, A.E.; Kornev, V.I.

    1998-01-01

    Glass-based materials to immobilize various liquid and solid radioactive wastes generated at nuclear power plants (NPP) were designed. Glassy waste forms can be produced using electric melting including a cold crucible melting. Leach rate of cesium was found to be 10 -5 -10 -6 g/(cm 2 day) (IAEA technique). Volume reduction factor after vitrification reached 4-5. Various technologies for NPP waste vitrification were developed. Direct vitrification means feeding of source waste into the melter with formation of glassy waste form to be disposed. Joule heated ceramic melter, and cold crucible were tested. Process variables at treatment of Kursk, Chernobyl (RBMK), Kalinin, Novovoronezh (VVER) NPP wastes were determined. The most promising melter was found to be the cold crucible. Pilot plant based on the cold crucibles has been designed and constructed. Solid burnable NPP wastes are incinerated and slags are incorporated in glass. (author)

  8. NPP electrical price and tariff in the world

    International Nuclear Information System (INIS)

    Mochamad Nasrullah and Sriyana

    2010-01-01

    Construction of a Nuclear Power Plant (NPP) is always become a controversial issue. Nuclear utility and other party which support the NPP present a calculation of NPP electricity cost too optimistic. However for utility and other party that contra to nuclear present a calculation of NPP electricity cost too pessimistic. This study present to reduce the controversy of nuclear cost. In this study, capital cost (Engineering Procurement Construction, EPC) was taken from Asian, America and Europe, operating and maintenance cost uses experience data of PLN, and nuclear fuel cost uses data year of 2008 with high price, low price and average price scenario. The methodological tools used to compare electricity generation cost was LEGECOST, a program developed by IAEA (International Atomic Energy Agency), while for electricity tariff- price calculation using a program developed by PLN research and development center. With the discount rate 10%, the result shows that the cheapest electricity generation cost of NPP is less than 40 mills/kWh, and average electricity tariff was 55 mills/kWh. In the Europe countries the electricity tariff more expensive than NPP in Asia. However generating cost and electricity tariff of NPP in United Stated of America (USA) less competitive because investment cost more expensive. Generating cost and electricity tariff was different at each country depend on salary, labor wage, materials price, construction specification, regulation related to NPP and environment aspect. (author)

  9. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  10. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  11. Dissemination of Knowledge about NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.

    2016-01-01

    Full text: Instrumentation and control (I&C) systems are the most variable part in the nuclear power plants (NPP) comparatively with any other NPP systems. This statement is connected with the wide use of computers, rapid changes in information technologies, with the appearance of new computer complex electronic components, e.g., field programmable gate arrays (FPGA) and with appropriate point of their insertion into NPP I&C life cycle. The changes in NPP I&C systems require the dissemination of the knowledge about these systems. Lessons after Fukushima accident increase necessity of these actions. The elaboration and following dissemination of this knowledge took place in different directions: • Writing and issue of three new books about NPP I&C systems for specialists and for students which were issued in Ukrainian and USA public houses (the last book was issued in 2014); • Organization of five international scientific technical conferences, devoted to NPP I&C safety problems; • Elaboration of national (Ukrainian) standards and regulations pertaining to safety important NPP I&C systems (the last standard was issued in 2015) and participation in elaboration of international standards; • Lecturing for university students, NPP specialists and I&C designers. These actions in all directions are added to IAEA activity in the area NPP I&C systems (e.g., IAEA NP-T-3.12 “Core Knowledge on I&C systems in NPP”). (author

  12. Probabilistic assessment of NPP safety under aircraft impact

    International Nuclear Information System (INIS)

    Birbraer, A.N.; Roleder, A.J.; Arhipov, S.B.

    1999-01-01

    Methodology of probabilistic assessment of NPP safety under aircraft impact is described below. The assessment is made taking into account not only the fact of aircraft fall onto the NPP building, but another casual parameters too, namely an aircraft class, velocity and mass, as well as point and angle of its impact with the building structure. This analysis can permit to justify the decrease of the required structure strength and dynamic loads on the NPP equipment. It can also be especially useful when assessing the safety of existing NPP. (author)

  13. NPP Bohunice experience with ASSET services

    Energy Technology Data Exchange (ETDEWEB)

    Klimo, J [Bohunice NPP (Slovakia)

    1997-12-31

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author).

  14. NPP Bohunice experience with ASSET services

    International Nuclear Information System (INIS)

    Klimo, J.

    1996-01-01

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author)

  15. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  16. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  17. Evaluation of implementation 18-month cycle in NPP Krsko

    International Nuclear Information System (INIS)

    Novsak, M.; Bilic Zabric, T.

    2003-01-01

    The feasibility study, which evaluates the impacts of the transition to the 18-month cycle on plant design bases, operational and maintenance requirements, long-term economics of the operation, is performed. Activities, which have to be implemented for adopting 18- month cycle, are presented. The study shows that implementation of 18-month cycle is possible with some investments through transition 15-month cycle. (author)

  18. Analysis of realization of the water chemistry modes in the NPP with the RBMK-1000 and main directions of their improvement

    International Nuclear Information System (INIS)

    Kritskij, V.G.; Tyapkov, V.F.; Belous, V.N.; Egorova, T.M.; Gost'kov, V.V.; Tishkov, V.M.; Yatsko, O.V.

    2005-01-01

    Paper deals with the analysis of normalization of the RBMK reactor NPP water chemistry conditions. One analyzed the imposed restrictions at deviation of the normalized parameters from the ones recommended for the normal operating conditions. Paper contains data on water chemistry management and describes measures to improve radiation situation near NPP reactor equipment. One studied the reasons of corrosion damage of the RBMK-1000 reactor NPP pipelines and the ways to prevent them via optimization and improvement of water chemistry conditions [ru

  19. Metamorphosis of NPP A1, V1, V2

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.

    2005-01-01

    In this book the history of construction, commissioning and exploitation of NPP A1, NPP V1 and NPP V2 in Jaslovske Bohunice is presented on documentary photos. Vicinity around of these NPPs is presented, too

  20. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  1. Analysis of 14C level around Qinshan NPP base

    International Nuclear Information System (INIS)

    Huang Renjie; Liang Haiyan; Chen Qianyuan; Ni Shiying; He Jun; Zeng Guangjian; Ma Yongfu

    2012-01-01

    By using the method of alkaline solution absorption, the activity concentrations of Carbon-14 as well as its variation tendency in air and biological samples were analyzed. The air samples and biological samples were collected around the Qinshan nuclear power plant base (Qinshan NPP Base) in 2002 to 2009 and 2007 to 2009 respectively. The results showed that, since 2002, the annual average activity concentrations of Carbon-14 in air samples were in the range of 38.3 mBq/m 3 to 55.4 mBq/m 3 . Although the monitoring results of Xiajiawan village and Yanliucun village were comparatively higher than the reference site in Hangzhou City, the results were still at the same level. Meanwhile, monitoring results of Xiajiawan village and Yangliucun village in the summer of 2004 and 2005 are relatively high, with the peak value of 55.4 mBq/m 3 appeared in Xiajiawan village during the summer of 2005. Correspondingly the annual airborne Carbon-14 of 2004 and 2005 discharged from the Qinshan NPP 3 rd Phase were higher than normal as well, it can therefore be concluded that the activity concentration of Carbon-14 around the Qinshan NPP Base are related to the discharged source term. The activity concentration of Carbon-14 in rice and leaf vegetable samples from Xiajiawan village and Yangliucun village were slightly higher, but within the same level, than that of Hangzhou. The activity concentration of Carbon-14 in the mullet samples collected from the sea area around Qinshan NPP Base are approximately the same with the sea area of Zhoushan. (authors)

  2. Investigation into possibilities of concrete recycling after NPP decommissioning

    International Nuclear Information System (INIS)

    Maehkava, N.

    2003-01-01

    Investigations into the expansion of using disassembled concrete of the Tokai NPP (Japan) are conducted. Two kinds of concretes were analyzed with the aim to use as regenerated filler: with building solution on the surface of sample and without building solution removed highly effective treatment. Problems of economy of concrete recycling and environmental impacts are considered. Previous investigations demonstrate the efficiency of using regenerated filler [ru

  3. Monitoring program of surrounding of the NPP SE-EBO

    International Nuclear Information System (INIS)

    Dobis, L.; Kostial, J.

    1997-01-01

    The paper dealt with monitoring program of radiation control of surrounding of the NPP Bohunice, which has the aim: (1) to ensure the control of influence of work of the NPP Bohunice on the environment in their surrounding; (2) to ensure the back-ground for regular brief of control and supervisory organs about condition of the environment in surrounding of the NPP Bohunice; (3) to maintain the expected technical level of control of the NPP Bohunice and to exploit optimally the technical means; (4) to solicit permanently the data about the radioactivity of environment in surrounding of the NPP Bohunice for forming of files of the data; (5) to exploit purposefully the technical equipment, technical workers and to maintain their in permanent emergency and technical eligibility for the case of the breakdown; (6) to obtain permanently the files of the values for qualification of the reference levels. This program of monitoring includes the radiation control of surrounding of the NPP Bohunice, in the time of normal work of power-station's blocks, inclusively of all types of trouble-shooting and repairer works in surrounding of the NPP Bohunice, up to distance 20 km from power-station. The monitoring includes: outlets from the NPP Bohunice, monitoring of radiation characteristics in surrounding of the NPP Bohunice, (aerosols, fall-outs, soil), the links of food chains: (grass and fodder, milk, agriculture products), hydrosphere in surrounding (surface waters, drink water, bores of radiation control in complex of the NPP Bohunice, components of the hydrosphere), measurement of radiation from external sources (measurement of the dose rates, measurement of the doses [sk

  4. Sociological investigations on Ignalina NPP and within its surroundings

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The purpose of this study was to determine the impact of Ignalina NPP and Visaginas town on the social territorial processes in the region and to reveal the impact of Ignalina NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological affect. According to the results of this research three quarters of the inhabitants and the functionaries of local administration hold an opinion that operation of Ignalina NPP posses threat for the population and environment. Meanwhile they are sure that danger of Ignalina NPP is not critical. 21 - 35 % of the local administrators speak for the closure of Ignalina NPP , whereas half of Visaginas residents and three quarters of the local administrators indicate that operation of reactors is expedient. Over 90% of the population do not have sufficient information on the operation of Ignalina NPP. In the opinion of the rest Lithuanian people Ignalina NPP zone is related with the physical danger and the image of Visaginas residents as the 'others', 'strangers'. More than 90% of Ignalina NPP employees are Russian speaking, not native Lithuanians. The social relations of Visaginas with the environment are poor as a result of the situation of the town, lack of communications and cultural self isolation. (author)

  5. Establishment of ''Internal Rules'' and EDMS - Electronic Document Management System at NPP NEK

    International Nuclear Information System (INIS)

    Mandic, D.

    2012-01-01

    The main purpose of this paper is to present NPP's plans regarding the on-going project that started in November 2011, and that is related to the establishment of ''Internal Rules'' and EDMS - Electronic Document Management System.The term ''Internal Rules'' has been directly translated from Slovenian language (''Notranja pravila'') and adopted from the translated version of appropriate Slovenian national codes (ZVDAGA [1] in Slovenian language or PDAAIA [2] in English version). ''Internal Rules on capture and storage of materials in digital form'' refer to the rules adopted by a person as his/her internal act with reference to storage of his/her material. The main purpose for the establishment of the Internal Rules is to be able to justify that Krsko NPP is organized in compliance with the national codes covering that subject and strictly performing according to those Internal Rules. Once a Slovenian company achieves recognized and registered status in accordance with the Internal Rules document that has been certified and approved by the ARS (Archives of the Republic Slovenia), such company can utilize e-documents in the same way as they would utilize physical documents. Furthermore, a Slovenian company with approved Internal Rules can use e-documents in any legal aspect associated with the document's life cycle and the document's content as they would use the physical document or an authorized and approved copy of the physical document. Related to the nuclear regulatory background, NEK operates in compliance with the Slovenian legislation and also the US codes, regulations and guidelines; therefore, regarding the NPP specific documents, the Internal Rules and EDMS must also be in compliance with them. Since early 1990's, NEK has implemented document/records management system oriented towards supporting storage and management of physical documents/records and controlling distribution of active document copies. Document/records management system was supported by

  6. Ageing management database development for PWR NPP steam generator

    International Nuclear Information System (INIS)

    Liu Hongyun; Xu Liangjun; Xiong Changhuai; Wang Xianyuan

    2005-01-01

    Steam generator (SG) is one of the key safe important equipment of NPP, which is covered by NPP aging management program. Steam Generator Aging Management Dabatase (SGAMDB) is developed to provide necessary information for SG aging management. RINPO is developing SGAMDB for domestic NPP. This system contains information and data about SG design, manufacture, operation and maintenance. The information include NPP fundamental data, SG design data, SG aging mechanism, SG operation data, SG ISI data, SG maintenance data and SG evaluation interface. The system runs at the intranet of Qinshan-1 NPP with B/S mode. It can provide information inquire and fundamental analysis for NPP SG aging team and SG aging researcher's. In addition, it provides necessary information and data for SG aging analysis and evaluation, such as all pressure test process and flaws of tubes, and collects the analysis results. (authors)

  7. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  8. Development of requirements tracking and verification technology for the NPP software

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Chul Hwan; Kim, Jang Yeol; Lee, Jang Soo; Song, Soon Ja; Lee, Dong Young; Kwon, Kee Choon

    1998-12-30

    Searched and analyzed the technology of requirements engineering in the areas of aerospace and defense industry, medical industry and nuclear industry. Summarized the status of tools for the software design and requirements management. Analyzed the software design methodology for the safety software of NPP. Development of the design requirements for the requirements tracking and verification system. Development of the background technology to design the prototype tool for the requirements tracking and verification.

  9. Development of requirements tracking and verification technology for the NPP software

    International Nuclear Information System (INIS)

    Jung, Chul Hwan; Kim, Jang Yeol; Lee, Jang Soo; Song, Soon Ja; Lee, Dong Young; Kwon, Kee Choon

    1998-01-01

    Searched and analyzed the technology of requirements engineering in the areas of aerospace and defense industry, medical industry and nuclear industry. Summarized the status of tools for the software design and requirements management. Analyzed the software design methodology for the safety software of NPP. Development of the design requirements for the requirements tracking and verification system. Development of the background technology to design the prototype tool for the requirements tracking and verification

  10. Leningrad NPP and energetics of north-western Russia

    International Nuclear Information System (INIS)

    Belov, I.

    2000-01-01

    Problems of Leningrad NPP operating units modernization, their design service life finishing by year of 2010, are discussed. To assure safe operation of unit 1 investments in the amount of 30 mln. dol are necessary. Estimations suggest economic efficiency of the measures, permitting saving of 300 mln. dol worth of gas. Unfortunately, without a rise in tariff for electric power produced by NPP it seems impossible. It is recommended that substantiated tariffs are set for electric power produced by NPP starting from January, 2000. The measure is indispensable for raising investment funds intended for operating NPP modernization [ru

  11. Overview of Cernavoda NPP training programme

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2005-01-01

    Full text: The paper presents a general assessment of Cernavoda NPP personnel training programme, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is the one responsible for the training of Unit 1 and 2 staff. PTAD is structured in such a manner as to support and respond to all Cernavoda NPP training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programmes are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programmes are structured on the initial and continuing personnel training. Their content and goals respond to the training specific needs for each plant major job family. In order to successfully support NPP training programmes, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. There are also a number of general areas for improvement of PTAD activity, such as operators and maintenance training, initial and continuing training of both Unit 1 and 2 staff. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  12. Organization of monitoring of agricultural products in NPP region

    International Nuclear Information System (INIS)

    Panteleev, L.I.; Spirin, E.V.; Sanzharova, N.I.

    1990-01-01

    Problem of organizing chemical and radiation monitoring of agricultural products in NPP region is considered. Attention is paid to monitoring during NPP siting and designing, to monitoring of radioactive contamination of agricultural products under normal NPP operation, emergency situations and decommissioning

  13. One dimensional reactor core model

    International Nuclear Information System (INIS)

    Kostadinov, V.; Stritar, A.; Radovo, M.; Mavko, B.

    1984-01-01

    The one dimensional model of neutron dynamic in reactor core was developed. The core was divided in several axial nodes. The one group neutron diffusion equation for each node is solved. Feedback affects of fuel and water temperatures is calculated. The influence of xenon, boron and control rods is included in cross section calculations for each node. The system of equations is solved implicitly. The model is used in basic principle Training Simulator of NPP Krsko. (author)

  14. Public opinion about nuclear energy, year 2002 poll

    International Nuclear Information System (INIS)

    Stritar, A.; Istenic, R.

    2002-01-01

    In the Nuclear Training Centre in Ljubljana we are polling our visitors on a yearly basis. The visitors, mainly elementary and high school students, are polled before they listen to the lecture and visit the permanent exhibition. In the year 2002 the attitude towards nuclear power remains favorable: 84,7% of polled population agrees with NPP Krsko operation until the end of its life cycle and 9,1% accept construction of another nuclear power plant in Slovenia.(author)

  15. Belene NPP

    International Nuclear Information System (INIS)

    Tsvetanov, P.

    1990-01-01

    The book presents the main results of the studies of the Bulgarian Academy of Sciences (BAS) on the construction of a new nuclear power plant at Belene on the Danube river. The programme of the studies comprises five areas: the socio-economic and energy development and the necessity of the commissioning; a technical project and design level of the equipment (safety, radioactivity control, waste disposal and economic efficiency of the power plant); the seismic properties of the construction site; the corresponding risk and design features of the plant; the ecological impacts of the NPP and public opinion. The studies in the different areas have been carried out by independent teams, fully responsible for the formulated topical conclusions. The general opinion of the BAS voiced in the book is that the construction of Belene NPP is not sufficiently substantiated and is considered unacceptable. 94 refs., 53 fig., 56 tabs. (R.Ts.)

  16. Study on human factor at NPP

    International Nuclear Information System (INIS)

    Nopp, I.

    1984-01-01

    Factors affecting the reliabilty of the reactor control by an NPP operator are considered on the base of the Czechoslovakia NPP operating experience. The reliability level of NPP operators depends on objective factors (conditions and regime of labour) determining the labour productivity and on subjective ones (psychological morale, physical and mental abilities and occupational level of personnel). Problems of the effect of physical and mental abilities and professional level on the reliability of personnel are considered to be the most important ones. The effect of individual abilities and specific features of the human body on changes in his occupational abilities can be estimated only to a certain degree

  17. Perspectives of NPP personnel training in the future?

    International Nuclear Information System (INIS)

    Khess, R.E.

    1996-01-01

    Problems of the NPP personnel education are discussed during radical reorganization of the state regulation of energy production and distribution when nuclear energetics will appears in the market conditions. Effective methods of the NPP personnel training developed by the corporation GPU Nuclear are given. Potentials of the application of simulators and computerized programs for increasing the NPP personnel education efficiency are considered

  18. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  19. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  20. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  1. Project No. 10 - Partial restoration of Ignalina NPP territory

    International Nuclear Information System (INIS)

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  2. Innovative Approach to Implementation of FPGA-based NPP Instrumentation and Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Andrashov, Anton; Kharchenko, Vyacheslav; Sklyar, Volodymir [Centre for Safety Infrastructure-Oriented Research and Analysis, Kharkov (Ukraine); SIORA Alexander [Research and Production Corporation Radiy, Kirovograd (Ukraine)

    2011-08-15

    Advantages of application of Field Programmable Gates Arrays (FPGA) technology for implementation of Instrumentation and Control (I and C) systems for Nuclear Power Plants (NPP) are outlined. Specific features of FPGA technology in the context of cyber security threats for NPPs I and C systems are analyzed. Description of FPGA-based platform used for implementation of different safety I and C systems for NPPs is presented. Typical architecture of NPPs safety I and C system based on the platform, as well as approach to implementation of I and C systems using FPGA-based platform are discussed. Data on implementation experience of application of the platform for NPP safety I and C systems modernization projects are finalizing the paper.

  3. Innovative approach to implementation of FPGA-based NPP instrumentation and control systems

    International Nuclear Information System (INIS)

    Andrashov, Anton; Kharchenko, Vyacheslav; Sklyar, Volodymir; Siora, Alexander

    2011-01-01

    Advantages of application of Field Programmable Gates Arrays (FPGA) technology for implementation of Instrumentation and Control (I and C) systems for Nuclear Power Plants (NPP) are outlined. Specific features of FPGA technology in the context of cyber security threats for NPPs I and C systems are analyzed. Description of FPGA-based platform used for implementation of different safety I and C systems for NPPs is presented. Typical architecture of NPPs safety I and C system based on the platform, as well as approach to implementation of I and C systems using FPGA-based platform are discussed. Data on implementation experience of application of the platform for NPP safety I and C systems modernization projects are finalizing the paper. (author)

  4. Innovative Approach to Implementation of FPGA-based NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Andrashov, Anton; Kharchenko, Vyacheslav; Sklyar, Volodymir; SIORA Alexander

    2011-01-01

    Advantages of application of Field Programmable Gates Arrays (FPGA) technology for implementation of Instrumentation and Control (I and C) systems for Nuclear Power Plants (NPP) are outlined. Specific features of FPGA technology in the context of cyber security threats for NPPs I and C systems are analyzed. Description of FPGA-based platform used for implementation of different safety I and C systems for NPPs is presented. Typical architecture of NPPs safety I and C system based on the platform, as well as approach to implementation of I and C systems using FPGA-based platform are discussed. Data on implementation experience of application of the platform for NPP safety I and C systems modernization projects are finalizing the paper

  5. Main principles of NPP project ecological expert investigation

    International Nuclear Information System (INIS)

    Dibobes, I.K.; Revina, S.K.; Glushkov, V.P.

    1983-01-01

    NPP project ecological expert investigation among the other objectives is to provide implementation of standards, rules and requirements as well as government decrees and international obligations of the USSR concerning the environment protection. The expert investigation takes into consideration both environment protection, regional, resources, ecological, demographic and economic aspects. The NPP siting and the local environment and resources state are estimated as well as the structure of utilization of the latter, the expected damage to the environment due to NPP construction and the measures directed towards the optimal using of natural resources. On the basis of the presented issues suggestions about NPP projects coordination with Goskomgidromet's institutions are given [ru

  6. Regulatory approach to NPP ageing in Bulgaria

    International Nuclear Information System (INIS)

    Vassilev, D.

    2000-01-01

    In this contribution summary information of Kozloduy NPP units is presented. The nuclear legislation, regulatory approach for managing safety aspects on NPP ageing, short term programme, complex programme PRG'97 ant other aspects of ageing management are discussed

  7. Automatic control system at the ''Loviisa'' NPP

    International Nuclear Information System (INIS)

    Kukhtevich, I.V.; Mal'tsev, B.K.; Sergievskaya, E.N.

    1980-01-01

    Automatic control system of the Loviisa-1 NPP (Finland) is described. According to operation conditions of Finland power system the Loviisa-1 NPP must operate in the mode of week and day control of loading schedule and participate in current control of power system frequency and capacity. With provision for these requirements NPP is equipped with the all-regime system for automatic control functioning during reactor start-up, shut-down, in normal and transient regimes and in emergency situations. The automatic control system includes: a data subsystem, an automatic control subsystem, a discrete control subsystem including remote, a subsystem for reactor control and protection and overall station system of protections: control and dosimetry inside the reactor. Structures of a data-computer complex, discrete control subsystems, reactor control and protection systems, neutron flux control system, inside-reactor control system, station protection system and system for control of fuel element tightness are presented in short. Two-year experience of the NPP operation confirmed advisability of the chosen volume of automatization. The Loviisa-1 NPP operates successfully in the mode of the week and day control of supervisor schedule and current control of frequency (short-term control)

  8. EMAS at Doel NPP

    International Nuclear Information System (INIS)

    Nolan, Peter; Thoelen, Els

    1998-01-01

    In October 1995, Doel NPP of Electrabel, Belgium opted to seek registration under the EC Eco-management and Audit Scheme (EMAS). A comprehensive environmental management system (EMS) has been introduced and implemented, encompassing all four PWRs and the supporting departments. A critical step was to seek certification from an accredited environmental auditing body against the International Standard ISO 14001. This provided the foundation for the publicly available environmental statement required by EMAS. The complications of achieving EMAS at a time when national and international standards were being re-formulated were successfully overcome and Doel NPP passed its EMAS audit in June 1997. (author)

  9. Financial feasibility analysis on small medium reactor nuclear power plant (SMR NPP) project in Indonesia under uncertainty

    International Nuclear Information System (INIS)

    Nuryanti; Suparman; Mochamad Nasrullah; Elok Satiti Amitayani; Wiku Lulus Widodo

    2015-01-01

    NPP SMR is one alternative to overcome the Outside Java Bali region's dependence on diesel power plant. One crucial issue in the NPP project (including SMR) would be financing, associated with the capital-intensive nature of the project. In addition, the SMR NPP project also be vulnerable in occurrence of some uncertainties. Therefore, this study aimed to analyze the financial feasibility of SMR NPP project by accommodating the possibility of the uncertainties. The methodology used is probabilistic analysis which was performed by Monte Carlo technique. This technique simulates the relationship between the uncertainty variables with financial feasibility indicators. The results showed that in probabilistic approach, SMR NPP project is considered feasible on the 'most probable value' of electricity selling price of 15 cents/kWh, indicated by positive average value of NPV (US$ 135,324,004) and the average value of both of IRRs are bigger than MARR (IRR project = 10.65 %, IRR Equity = 14.29 %, while MARR = 10 %). The probability of rejection of the SMR project was about 20 %. The three main variables that are most influential in the project were: selling price of electricity, investment cost and inflation rate. (author)

  10. On psichological problem of NPP operation and control

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1994-01-01

    The role of psichological factor as a reserve for increasing NPP safety connected with human factor is discussed. It is emphasized that the process of NPP personnel professional training should not be restricted by formation of a certain set of knowledge, skills and experience. It is necessary to initiate ability for constant self-developing. Control for assurance of effective interaction of the whole NPP personnel is an important problem

  11. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  12. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    Tret'yakov, V.P.

    1993-01-01

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  13. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  14. From the chronicle of training of Dukovany NPP staff

    International Nuclear Information System (INIS)

    2005-01-01

    The long way the Dukovany NPP had to go before the plant staff was fully qualified and skilled is described. First the training concept was prepared, then the necessary training facilities were set up, lecturers and instructors were hired and trained, training programmes and training materials were developed, and ultimately the first training course was launched in 1979. A training NPP was constructed and a full-scope simulator of the Dukovany NPP was set up. The current status of organization of NPP staff training by the CEZ utility is highlighted. (author)

  15. Observation and modeling of NPP for Pinus elliottii plantation in subtropical China

    Institute of Scientific and Technical Information of China (English)

    MA ZeQing; LIU QiJing; WANG HuiMin; LI XuanRan; ZENG HuiQing; XU WenJia

    2008-01-01

    Based on the stem analysis of 59 individuals of Pinus elliottii in combination with tree biomass models,we calculated annual biomass increment of forest plots at Qianyanzhou Ecological Station,Chinese Academy of Sciences in subtropical China. In addition,canopy layer and community NPP were calculated based on 12 years' litter fall data. NPP of the 21-year-old forest was estimated by using the BIOME BGC model; and both measured NPP and estimated NPP were compared with flux data. Community lation between annual litter fall and annual biomass increment; and the litter fall was 1.19 times the biomass increment of living trees. From 1985 to 2005,average NPP and GPP values based on BGC simulated tree layer NPP values. NPP accounted for 30.2% (25.6%-32.9%) of GPP,while NEP accounted for 57.5% (48.1%-66.5%) of tree-layer NPP and 41.74% (37%-52%) of stand NPP. Soil respiration accounted for 77.0% of measured tree NPP and 55.9% of the measured stand NPP. NEE based on eddy covariance method was 12.97% higher than the observed NEP.

  16. New Structure of Emergency Response Plan in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Cavlina, N.

    1998-01-01

    The new structure of a national emergency response plan in the case of nuclear accident is based on general requirements of modernization according to international recommendations, with a new Technical Support Center as a so-called lead technical agency, with the plan adapted to the organization of the Civil Protection, with all necessary elements of preparedness for the event of a nuclear accident in Krsko NPP and Paks NPP and with such a plan of procedures that will, to greatest possible extent, be compatible with the existing plan in neighboring countries Slovenia and Hungary. The main requirement that direct s a new organization scheme for taking protective actions in the event of a nuclear accident, is the requirement of introducing a Technical Support Center. The basic role of TSC is collecting data and information on nuclear accident, analyzing and estimating development of an accident, and preparing proposals for taking protective actions and for informing the public. TSC is required to forward those proposals to the Civil Protection, which on the basis of evaluation of proposals makes decisions on implementation and surveillance of implementation of protective measures. (author)

  17. Investigation of interfacing NPP simulators with PSCAD software

    International Nuclear Information System (INIS)

    Zahedi, P.

    2006-01-01

    This paper demonstrates a new method of interfacing a NPP simulator with the PSCAD software so that the interaction between the plant dynamics and the grid dynamics can be studied. Through this method, data extracted from NPP simulator, as an object, will be communicated to a server running PSCAD software. This paper will illustrate the use of Remote Procedure Calls (RPC) as a distributed, client-server based application used to establish a connection between NPP simulator running on UNIX server and PSCAD running on a PC. Using this method, the called procedure need not exist in the same address space as the calling procedure. Communication protocols available in the NPP simulator are used to export data from the simulator. (author)

  18. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  19. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  20. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  1. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  2. Reactor plant for Belene NPP completion

    International Nuclear Information System (INIS)

    Dragunov, Yu. G.; Ryzhov, S. B.; Ermakov, D. N.; Repin, A. I.

    2004-01-01

    Construction of 'Belene' NPP was started at the end of 80-ties using project U-87 with V-320 reactor plant, general designer of this plant is OKB 'Gidropress'. At the beginning of 90-ties, on completing the considerable number of deliveries and performance of civil engineering work at the site the NPP construction was suspended. Nowadays, considering the state of affairs at the site and the work performed by Bulgarian Party on preservation of the equipment delivered, the most perspective is supposed to be implementation of the following versions in completing 'Belene' NPP: for completion of Unit 1 - reactor plant VVER-1000 on the basis of V-320 reactor with the maximum use of the delivered equipment (V-320M) having the extended service life and safety improvement; for Unit 2 - advanced reactor plant VVER-1000. For the upgraded reactor plant V-230M the basic solutions and characteristics are presented, as well as the calculated justification of strength and safety analyses, design of the reactor core and fuel cycle, instrumentation and control systems, application of the 'leak-before break' in the project and implementation of safety measures. For the modernised reactor plant V-392M the main characteristics and basic changes are presented, concerning reactor pressure vessel, steam generator, reactor coolant pump set. Design of NPP with the modernized reactor plant V-320M meets the up-to-date requirements and can be licensed for completion and operation. In the design of NPP with the advanced reactor plant the basic solutions and the equipment are used that are similar to those used in standard reactor plant V-320 and new one with VVER-1000 under construction and completion in Russia, and abroad. Compliance of reactor design with the up-to-date international requirements, considering the extended service life of the main equipment, shows its rather high potential for implementation during completion of 'Belene' NPP

  3. Hydrodynamics and sediment transport at Muria Peninsula NPP Site

    International Nuclear Information System (INIS)

    Heni Susiati; Berni A Subki; Harman A

    2011-01-01

    Coastal along the coast of the Muria Peninsula, particularly the location of the Muria NPP site candidate is a dynamic region, the interaction between physical oceanographic factors such as currents, waves and tides in the coastal sediments cause abrasion or accretion. Interactions have resulted in coastal dynamics needs to be considered in siting NPP is essential in order to plan. Capacity of hydro-oceanographic data is essential in order to plan the development of the Muria NPP. The process of selecting a safe site for hydro-oceanographic aspects carried out according to IAEA safety standards on site selection. For the evaluation stage of hydro oceanographic potential site (site survey stage), the analysis is more focused on the tidal along the northern coast, bathymetry, potential water resources and hydrologic systems in the Muria NPP siting locations, Jepara. The method used is a secondary, confirmation of field data collection and interpretation of modeling results. The results showed that the preparation for the construction of NPP need to be evaluated further to coastal conditions with respect to the increase coastal erosion in the area of prospective NPP siting. (author)

  4. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  5. Safety culture in Ignalina NPP, regulatory view

    Energy Technology Data Exchange (ETDEWEB)

    Maksimovas, G [VATESI (Lithuania)

    1997-09-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP.

  6. Safety culture in Ignalina NPP, regulatory view

    International Nuclear Information System (INIS)

    Maksimovas, G.

    1997-01-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP

  7. Conference: Nuclear Safety at the Ignalina NPP - Achievements and Challenges

    International Nuclear Information System (INIS)

    1999-01-01

    Brief description of conference which took place in Vilnius on 8-9 April 1999 is presented. The aim of the international conference is to review the work carried out, to evaluate its influence on the nuclear safety, to get acquainted with the safety system of the Ignalina NPP. On December 31, the Ignalina NPP celebrated its 15 year anniversary. During that period the Ignalina NPP has produced more than 182 billion kWh of electricity. Nuclear power is not only immense economic benefit but also a syndrome of fear of an atomic bomb and the Chernobyl accident that has formed over the years. Numerous comprehensive international studies have been performed at the Ignalina NPP. After the Chernobyl accident many steps have been taken to improve the safety of the Ignalina NPP. The introduced changes guaranteed that the void coefficient remained negative in all possible circumstances. The Ignalina NPP is intensively preparing for licensing of unit 1

  8. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  9. Development of a dose assessment computer code for the NPP severe accident

    International Nuclear Information System (INIS)

    Cheong, Jae Hak

    1993-02-01

    A real-time emergency dose assessment computer code called KEDA (KAIST NPP Emergency Dose Assessment) has been developed for the NPP severe accident. A new mathematical model which can calculate cloud shine has been developed and implemented in the code. KEDA considers the specific Korean situations(complex topography, orientals' thyroid metabolism, continuous washout, etc.), and provides functions of dose-monitoring and automatic decision-making. To verify the code results, KEDA has been compared with an NRC officially certified code, RASCAL, for eight hypertical accident scenarios. Through the comparison, KEDA has been proved to provide reasonable results. Qualitative sensitivity analysis also the been performed for potentially important six input parameters, and the trends of the dose v.s. down-wind distance curve have been analyzed comparing with the physical phenomena occurred in the real atmosphere. The source term and meteorological conditions are turned out to be the most important input parameters. KEDA also has been applied to simulate Kori site and a hyperthetical accident with semi-real meteorological data has been simulated and analyzed

  10. Core power capability verification for PWR NPP

    International Nuclear Information System (INIS)

    Xian Chunyu; Liu Changwen; Zhang Hong; Liang Wei

    2002-01-01

    The Principle and methodology of pressurized water reactor nuclear power plant core power capability verification for reload are introduced. The radial and axial power distributions of normal operation (category I or condition I) and abnormal operation (category II or condition II) are simulated by using neutronics calculation code. The linear power density margin and DNBR margin for both categories, which reflect core safety, are analyzed from the point view of reactor physics and T/H, and thus category I operating domain and category II protection set point are verified. Besides, the verification results of reference NPP are also given

  11. Validation of MCNP NPP Activation Simulations for Decommissioning Studies by Analysis of NPP Neutron Activation Foil Measurement Campaigns

    Directory of Open Access Journals (Sweden)

    Volmert Ben

    2016-01-01

    Full Text Available In this paper, an overview of the Swiss Nuclear Power Plant (NPP activation methodology is presented and the work towards its validation by in-situ NPP foil irradiation campaigns is outlined. Nuclear Research and consultancy Group (NRG in The Netherlands has been given the task of performing the corresponding neutron metrology. For this purpose, small Aluminium boxes containing a set of circular-shaped neutron activation foils have been prepared. After being irradiated for one complete reactor cycle, the sets have been successfully retrieved, followed by gamma-spectrometric measurements of the individual foils at NRG. Along with the individual activities of the foils, the reaction rates and thermal, intermediate and fast neutron fluence rates at the foil locations have been determined. These determinations include appropriate corrections for gamma self-absorption and neutron self-shielding as well as corresponding measurement uncertainties. The comparison of the NPP Monte Carlo calculations with the results of the foil measurements is done by using an individual generic MCNP model functioning as an interface and allowing the simulation of individual foil activation by predetermined neutron spectra. To summarize, the comparison between calculation and measurement serve as a sound validation of the Swiss NPP activation methodology by demonstrating a satisfying agreement between measurement and calculation. Finally, the validation offers a chance for further improvements of the existing NPP models by ensuing calibration and/or modelling optimizations for key components and structures.

  12. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  13. Current technological trends in development of NPP systems

    International Nuclear Information System (INIS)

    Florescu, Gheorghe; Panaitescu, Valeriu

    2010-01-01

    The recent nuclear research issues look for new technologies and continuous progress in finding different and efficient solutions for sustained and upraising energy demand. The trend of increasing energy consumption and occurring of new and large consumers, especially from Asian countries, imposes finding of new means for clean, large scale and sustained energy production. NPPs availability was continuously monitored and improved; at the same time the safety of the nuclear energy production was under surveillance. The present development of the new technologies, the discoveries of new materials and development of efficient technological processes offer the opportunities for their appropriate implementation and use in the NPP system configurations and functioning/operation. The new technologies and scientific discoveries, and also the international cooperation, offer the opportunities to mitigate the actual barriers in order to cumulate and use advanced energy production, to find new energy sources and to build improved, reliable and safe power plants. The monitoring systems, intelligent sensors and SSCs, nanotechnologies and new/intelligent materials constitute the main ways for improvement of the NPP systems configuration and processes. The paper presents: - The state of the art in the level of the currently applied technologies for nuclear power systems development; - The actual technological limits that need to be over passed for improving the NPP systems ; - The main systems that need improvement and reconfiguration for development of currently operating NPPs as well as raising the operation efficiency, availability and total safety; - The actual energy production issues; - The key arguments in sustaining the R and D new NPP systems development; - Future trends in NPP development; - The limitations in industrial processes knowledge and use. Appropriate R and D in the field of NPP systems have specific characteristics that were considered in paper completion

  14. Summary of NPP personnel training in Czech Republic

    International Nuclear Information System (INIS)

    1996-01-01

    The preparation of NPP personnel is one of the most important phases of the process of construction, commissioning, operation and maintenance of nuclear power facilities. The objective is to improve personnel abilities so that they would be able to assure reliable, safe and economic operation of these facilities with high investment costs. It is the purpose of Nuclear Training Centre Brno (NTC Brno) to provide training and services which are responsive to the technological demands and emerging educational standards and criteria of the NPP and the nuclear industry. Fulfilling this purpose is a challenging task. The staff of NTC Brno, in a joint effort with NPP Dukovany and NPP Temelin, has responded to the challenge with comprehensive programs aimed at meeting customers needs. The programs are broadly based, yet flexible so that they can incorporate specific customer requirements

  15. Emergency preparedness at Barsebaeck NPP in Sweden

    International Nuclear Information System (INIS)

    Olsson, R.; Lindvall, C.

    1998-01-01

    On-site emergency preparedness plan at Barsebaeck NPP is presented. In an emergency the responsibility of the NPP is to alarm the emergency organizations, spend all efforts to restore safe operation, assess the potential source term as to size and time, protect their own personnel, inform personnel and public. Detailed emergency procedures overview is provided

  16. Jose Cabrera NPP severe accident management activities

    International Nuclear Information System (INIS)

    Blanco, J.; Almeida, P.; Saiz, J.; Sastre, J.L.; Delgado, R.

    1998-01-01

    To prepare a common acting plan with respect to Severe Accident Management, in 1994 was founded the severe accident management ''ad-hoc'' working group from the Spanish Westinghouse PWR Nuclear Power Plant Owners Group. In this group actively collaborated the Jose Cabrera NPP Training Centre and the Department of Nuclear Engineering of UNION FENOSA. From this moment, Jose Cabrera NPP began the planning of its specific Severe Accident Management Program, which main point are Severe Accident Management Guidelines (SAMG). To elaborate this guidelines, the Spanish translation of Westinghouse Owners Group (WOG) Severe Accident Management Guidelines were considered the reference documents. The implementation of this Guidelines to Jose Cabrera NPP started on January 1997. Once the specific guidelines have been implemented to the plant, training activities for the personnel involved in severe accident issues will be developed. To prepare the training exercises MAAP4 code will be used, and with this intention, a specific Jose Cabrera NPP MAAP-GRAAPH screen has been developed. Furthermore, a wide selection of MAAP input files for the simulation of different scenarios and accidental events is available. (Author)

  17. Application of ARCON96 in NPP control room habitability assessment and its comparison with composite wake model

    International Nuclear Information System (INIS)

    Fang Sheng; Li Hong; Fang Dong

    2012-01-01

    ARCON96 is the current NRC-recommended atmospheric dispersion model that may be used to estimate atmospheric relative concentration in assessing the habitability of a NPP control room during design basis radiological events. Based on meteorological data from a NPP site in China, the atmospheric relative concentration was calculated and analyzed using ARCON96, and then compared with calculations by the composite wake model. Results demonstrated that ARCON96 is feasible for atmospheric relative concentration estimation and its estimate is more conservative than the composite wake model. (authors)

  18. On the NPP structural reliability

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    Reviewed are the main statements peculiarities and possibilities of the first branch guiding technical material (GTM) ''The methods of calculation of structural reliability of NPP and its systems at the stage of projecting''. It is stated, that in GTM presented are recomendations on the calculation of reliability of such specific systems, as the system of the reactor control and protection the system of measuring instruments and automatics and safe systems. GTM are based on analytical methods of modern theory of realibility with the Use of metodology of minimal cross sections of complex systems. It is stressed, that the calculations on the proposed methods permit to calculate a wide complex of reliability parameters, reflecting separately or together prorerties of NPP dependability and maintainability. For NPP, operating by a variable schedule of leading, aditionally considered are parameters, characterizing reliability with account of the proposed regime of power change, i.e. taking into account failures, caused by decrease of the obtained power lower, than the reguired or increase of the required power higher, than the obtained

  19. Influence of fuel element burn-up on the power peaking factor in PWR; Vpliv zgorelosti gorivnega elementa na konicne faktorje moci v tlacnovodnem reaktorju

    Energy Technology Data Exchange (ETDEWEB)

    Ravnik, M; Mele, I [Institut ' Jozef Stefan' , Ljubljana (Yugoslavia); Falkowski, J [Institut energii atomowel, Swierk (Poland)

    1988-07-01

    Influence of fuel element burn-up distribution on radial power peaking factors is presented for Krsko NPP. The effect is strong for elements loaded in the periphery of the core with large power gradients. Neglecting the burn-up distributions inside fuel elements leads to {+-} 5% error on power peaking factor of the same element and {+-} 2% at other locations in the core. Influence on k is observed due to perturbed leakage from the core and due to redistribution of the importance function of the core. (author)

  20. Technical and economical problems of decommissioning nuclear power plants (NPP) in Russia

    International Nuclear Information System (INIS)

    Vaneev, M.

    2001-01-01

    The introduction per new century has brought to atomic Engineering many new problems. One of them, which has got a serious urgency, we now shall consider. It is a problem of decommissioning NPP in Russia. By 2014 all maintained nowadays NPP in Russian Federation will develop the regular service life. And all of them on idea should be removed from operation. But, as we understand, in today's difficult economic conditions, to it NPP the procedure of prolongation of service life will be applied, and where it is impossible by virtue of the various reasons, the procedure of translation NPP in nuclear - safe condition and in a mode of a long storage under supervision, before acceptance of the decision about a method and way of financing of a decommissioning will be applied. Possible the following variants will be: use platforms of the old NPP for construction new NPP, or using as burial place NPP. The variant of a decommissioning up to a condition 'green grass' is represented unprofitable because of its dearness. The similar decommissioning was carried out in Japan. Was removed from operation research reactor of a type WWR. The expenses for this method of a decommissioning considerably surpass expenses for a method of a burial place NPP basically because of high cost of dismantle and transportation in long-term storehouses of the 1 contour equipment. The most urgent problem of decommissioning NPP, which developed their regular service life - is financing this final stage of a exploitation cycle of the block. I shall remind, that the financing is carried out from uniform fund of decommissioning. The formation of this fund occurs by deduction 1.3 % of cost of the put electric power to the consumers by all maintained NPP of Russia. The expenditure of this fund is carried on time on some tens years. They are spent for 3 basic stages: preparation to decommissioning NPP, long endurance under supervision, dismantle and burial the NPP equipment. Nowadays on faculty NPP MPEI

  1. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  2. Constructive approaches to the space NPP designing

    International Nuclear Information System (INIS)

    Eremin, A.G.; Korobkov, L.S.; Matveev, A.V.; Trukhanov, Yu.L.; Pyshko, A.P.

    2000-01-01

    An example of designing a space NPP intended for power supply of telecommunication satellite is considered. It is shown that the designing approach based on the introduction of a leading criterion and dividing the design problems in two independent groups (reactor with radiation shield and equipment module) permits to develop the optimal design of a space NPP [ru

  3. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  4. Sitting Safety Aspects of Second Romanian NPP

    International Nuclear Information System (INIS)

    Mauna, T.

    2010-01-01

    The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units like the Wolsong applied design project for nuclear island. For the BOP parts the ASALDO-GE project was applied with the careful about the interface connection NSP requirements. The new NPP sitting studies began from 1982 in a serious manner as first part on Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. For develop the all package of the studies in concordance with the first IAEA Safety Standards recommendations. Till the 1982 the first mission of design and research multi-branch of specialists team was to adapt the NPP Cernavoda project having a open water cooling circuit to the new parameters of close water cooling circuit. But the team was looking at the other type of NPP for sitting. Also in the same time was studied the possibility of NSP foundation on hard less or soft soil foundation strata in connection with safety aspects. The close circuit of cooling water means others parameters of systems and need very large cooling towers. Also must be reconsidering the safety systems design and performance as new solution. In the south of Transylvania historical region in Romania the Olt River run from west to east having medium multi annual flow around 70 m3/s. The Olt River has a chain of small hydropower in operation and other planned. From geological and geophysical points of view two main faults, along the Olt river valley, one of this having seismically small activities was detected. Site region geotechnical studies show small quantity underground natural gas, salt and peat. The initial nuclear program has imposed 4 NPP units site near Olt River. Taking into account the orogenesis, water cooling needs and other local feature can't be built more than two NPP units on a site. This paper tries to reconsider the old analysis from the last IAEA Safety Standards point of view taking into account the new

  5. Considerations related to Cernavoda NPP lifetime management

    International Nuclear Information System (INIS)

    Cojan, Mihail

    2007-01-01

    Cernavoda NPP, the first CANDU in Europe, is one of the original CANDU 6 plants and the first CANDU 6 producing over 706 MWe. While the first series of CANDU 6 plants (which entered service in the early 1980 s) have now reached the 2/3 of their 30 years design life, the Cernavoda NPP was put into service on the 2nd December 1996. After 10 years of operation the Plant Life Management (PLiM) Program for Cernavoda should be an increasingly important program to Utility ('CNE - Prod') in order to protect the investment and the continued success of plant operation. The goal of the paper is to present some considerations related to Cernavoda NPP lifetime management. The Plant Life Management Program, known as PLiM Program is concerned with the analysis of technical limits of the safe operation - from the point of view of nuclear safety - in NPP units, aiming at attaining the planned 30 years life duration and its extension to 40 or even 50 years of safe and economical operation. For the CANDU reactors the so-called PLiM and PLEX Programs are just applied. These are applied research programs that approach with priority the current practices for assessing the capability of safe operation within the limits of nuclear safety (fitness-for-service assessment). These programs also approach inspection, monitoring are prevention of degrading due to the ageing of critical systems, structures and components (CSSCs). As each nuclear plant is somewhat different in its components and systems, materials composition, procurement, construction, and operational history, directed research and development programs into materials behavior, monitoring techniques, and methods to mitigate ageing are required to support the lifetime management. Over the past 6 years, INR Pitesti (Institute for Nuclear Research - Romania) has been working on R and D Programs to support a comprehensive and integrated Cernavoda NPP Life Management Program (PLiM) that will see the Cernavoda NPP successfully and

  6. Precautions against axial fan stall in reactor building to Tianwan NPP

    International Nuclear Information System (INIS)

    Liu Chunlong; Pei Junmin

    2011-01-01

    The paper introduces the mechanism and harm of rotating stall of axial fans, analyzes the necessity for prevention against axial fan stall in reactor building of Tianwan NPP, introduces the precautions, and then makes an assessment on anti-stall effect of flow separators. It can provide reference for model-selection or reconstruction of similar fans in power stations, and for operation and maintenance of axial fans. (authors)

  7. Plant level of automated control system at a NPP with RBMK reactor

    International Nuclear Information System (INIS)

    Vorob'ev, V.P.; Gorbunov, V.P.; Dmitriev, V.M.; Litvin, A.S.

    1987-01-01

    The functional structure of plant level automated control system (ACS) at NPP with RBMK-1000 reactors, its binding with the on-line control system of higher and lower levels, as well as engineering requirements to software and recommendations on composition of hardware components, are considered. NPP ACS is an organizational-engineering system consisting of computer facilities and binding aimed at solving management, economical, organizational and physical-engineering problems to control NPP more effectively. The system carries out data acquisition, preliminary processing, analysis, transmission and representation for users to accept solutions for NPP operation by operative and management personnel. The main aim of integrated NPP ACS is the control development and increase of NPP economical efficiency, the increase of electric and heat energy production, the optimization of the production distribution between units, the development of production and economic NPP control

  8. Modernization and safety improvement project of the NPP V-2 Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    2000-01-01

    This contribution deals with the form, present state, and results of the Nuclear Power Plants Research Institute (the Slovak acronym is VUJE - Vyskumny Ustav Jadrovych Elektrarni) participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project. A short description of VUJE history, activity, and results is also presented as well as NPPs Jaslovske Bohunice characterization. VUJE was established in 1977 and deals with scientific and research needs of nuclear power plants, such as design, construction, commissioning and operation. The next fields of VUJE activity are, NPP reconstruction, NPP personnel training, radioactive waste management technology, and NPP decommissioning. The nuclear power plant, Jaslovske Bohunice, is situated approximately 15 km from the district town of Trnava in the southwestern region of the Slovak Republic. The construction of the first Czechoslovak NPP A-1 began on this site in 1957 .The construction of the double-unit NPP V-1 with WWER-440 (type V-230) reactor began in 1972. The first unit of NPP V-1 began operation in 1978 and the second in 1980. NPPs construction on the Bohunice site continued with NPP V-2, which has two units with WWER-440 (type V-213) reactors. Unit 1 and Unit 2 of NPP V-2 were commissioned in 1984 and 1985, respectively. Slovak electric utility Slovenske elektrarne (SE) is the owner/commissioner of NPP V-2. This NPP is responsible for more than 20% of the total electrical energy production of SE, making it an essential supporter of the Slovak economy. (authors)

  9. Using the digital reactor control systems at NPP

    International Nuclear Information System (INIS)

    Schirl, G.; Hertel, J.

    2006-01-01

    A conception of application of the digital reactor control systems (RCS) at NPP is presented. The digital RCS architecture and safety ensuring are considered. The strategy and algorithm of the operating NPP equipping with the new digital RCS are given too [ru

  10. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  11. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  12. Heat delivery from Bohunice NPP, Slovakia

    International Nuclear Information System (INIS)

    Paley, I.

    1998-01-01

    Experience with nuclear district heating in the Slovak Republic is reported. The heating system of the town of Trnava is supplied by the Bohunice NPP and conventional sources. Construction of the hot water heating system from the Bohunice NPP began in 1983. Commercial operation began on 10 December 1987. Heat delivery has gradually increased from 478 TJ in 1988, to 1,104 TJ in 1995. The heat cost is low, resulting in an increasing number of consumers. (author)

  13. Ukrainian Nuclear Society International Conference 'Modernization of the NPP with VVER reactor' (abstracts)

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1999-01-01

    Abstracts of the papers presented at International conference of the Ukrainian Nuclear Society 'Modernization of the NPP with VVER reactor'. The following problems are considered: improving the NPP's safety and reliability; reactor modernization, the lifetime prolongation; increasing of the reactor operating characteristics; methods of capacity factor increasing: refueling control, maintenance control; technical and economical aspects of NPP modernization; modernization of the automated control system of the fuel process at the NPP's; technical features and methods for the continued radiation and technology control at the NPP's; training, increasing the staff qualification and NPP modernization

  14. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  15. Spent fuel pool risk analysis for the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Hust' ak, S.; Jaros, M.; Kubicek, J. [UJV Rez, a.s., Husinec-Rez (Czech Republic)

    2013-07-01

    UJV Rez, a.s. maintains a Living Probabilistic Safety Assessment (Living PSA) program for Dukovany Nuclear Power Plant (NPP) in the Czech Republic. This project has been established as a framework for activities related to risk assessment and to support for risk-informed decision making at this plant. The most extensively used PSA application at Dukovany NPP is risk monitoring of instantaneous (point-in-time) risk during plant operation, especially for the purpose of configuration risk management during plant scheduled outages to avoid risk significant configurations. The scope of PSA for Dukovany NPP includes also determination of a risk contribution from spent fuel pool (SFP) operation to provide recommendations for the prevention and mitigation of SFP accidents and to be applicable for configuration risk management. This paper describes the analysis of internal initiating events (IEs) in PSA for Dukovany NPP, which can contribute to the risk from SFP operation. The analysis of those IEs was done more thoroughly in the PSA for Dukovany NPP in order to be used in instantaneous risk monitoring. (orig.)

  16. High acceptance of nuclear power by youngsters in Slovenia

    International Nuclear Information System (INIS)

    Stritar, Andrej; Istenic, Radko

    2001-01-01

    This is a regular report at PIME about the development of public opinion in Slovenia. Nuclear Training Centre Milan Copic at the Jozef Stefan Institute in Ljubljana is performing extensive public information activities. All the elementary and high schools in Slovenia are invited to visit our permanent exhibition and attend the lecture about the nuclear energy or radioactive waste disposal. Every year we are also trying to update picture about the perception of Slovenian young public to nuclear energy. In the spring 2000 altogether 845 visitors of our Information Centre were polled. They are answering before they listen to the lecture or visit the exhibition. In that way we are trying to obtain their opinion based on the knowledge they get in everyday life. We are maintaining the same set of questions every year in order to facilitate tracking of changes. Questions are based on early public opinion research done by Faculty of Social Sciences more than ten years ago. Conclusions: Public opinion about nuclear energy in Slovenia, at least of the young generation, remains to be quite favourable. - Number of people that support operation of NPP Krsko until the end of its life time has increased from 70,49% last year to 73,14% this year. If we add to that also those that would be willing to accept another NPP, we come to the 82,49% of full supporters (78,14% last year). At the same time percentage of people, that would stop NPP Krsko immediately is dropping steadily (from 12,28% in 1993 to 3,79% this year). - It is interesting to note that this year environmental friendliness of nuclear power was better recognised (question about reasons for the use of nuclear energy). - There is a lot of misunderstanding evident about the contents of the waste in the low level radioactive waste repository and danger of radioactive waste to the environment. - Disposal of waste remains to be considered as a major disadvantage of nuclear energy, bigger than possibility of an accident

  17. Current status of Chernobyl NPP decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Strategy of Chernobyl NPP decommissioning with the decommissioning license 2002-2064 is presented. The main activities at the stage of ChNPP units shutdown (2002 - 2012) are: units maintenance in safe state; decommissioning infrastructure construction; unloading of SNF – main activity determining the stage duration; systems and elements final shutdown; decommissioning life-support systems reconstruction; Comprehensive engineering and radiation survey (CERS); dismantling of the reactor facilities external equipment; removal of RAW from units; decommissioning documentation development. The decommissioning activities main results are presented

  18. Meeting up-to-date safety requirements in the Russian NPP projects

    International Nuclear Information System (INIS)

    Tepkyan, G. O.; Yashkin, A. V.

    2014-01-01

    Safety features in Russian NPP designs are implemented by the combination of active and passive safety systems • Russian NPP designs are in compliance with up-to-date international and European safety requirements and refer to Generation III+ • Russian state-of-the-art designs have already implemented some design solutions, which take into account “post-Fukushima” requirements. Russian NPP design principles have been approved during the European discussions in spring 2012, including the IAEA extraordinary session addressed to Fukushima NPP accident

  19. Results and development prospects for the Cernavoda NPP

    International Nuclear Information System (INIS)

    Rotaru, Ioan

    2001-01-01

    The new competitive market in the power sector offers favorable conditions for continual developing of Nuclear Power in Romania. The principal arguments in this respect are: the CANDU technology is a western technology recognized world wide both for its operation reliability and its economical performances. The results obtained by Cernavoda NPP Unit 1 over a period of four years and a half commercial operation confirms the validity of the CANDU project in Romania in the new conditions of competitive market. Accomplishing the Unit 2 of Cernavoda NPP represents for the time being one of the most cost-effective investment in the Romanian power sector. Also, the participation of the local industry to the project implementation is important as it ensures the initial heavy water and nuclear fuel charging, specific materials and equipment production, design and construction works, etc. Heaving in view all these favorable arguments, the construction of Unit 2 of Cernavoda NPP represents one of the highest priorities of the State Budget of the present administration in year 2001. The Nuclear Power Project in Romania, based on CANDU technology meets national as well as EU regulations concerning nuclear power and as such its development poses no significant problems both in the context of EU extension and in the frame of the developing competitive market in the power sector. For SNN SA the main objectives in view for the next stage are: operating Cernavoda NPP Unit 1 in conditions of highest nuclear safety and economical efficiency; finalizing the Cernavoda NPP Unit 2 and creation of an organisation for operating the two units; promoting of a functional system characteristic to the competitive market economy and open to privatization; creating opportunities for exporting electrical energy. The contribution contains the following sections: 1. General overlook; 2. Performance of the power production in the year 2000; 2.1. Unit 1 of Cernavoda NPP; 2.2. Nuclear Fuel Plant

  20. Diversity of microflora at the fourth destroyed unit of the ChNPP

    International Nuclear Information System (INIS)

    Parenyuk, O.Yu.; Shavanova, K.Je.; Yilljenko, V.V.; Gudkov, Yi.M.; Nanba, K.; Takasi, T.; Syimutyin, Yi.O.; Samofalova, D.O.; Ribalka, V.B.

    2017-01-01

    DNA of the substrate, sampled from six points in the destroyed 4-th power unit of ChNPP, where the dose rate on the microorganisms ranges from 0.008 to 0.12 Gy/h, was analyzed by New Generation Sequencing technology. It was found that the most diverse and stable microbiome occurs in sample, located outside of the ''Ukryttya'' object on the industrial site (conditional control). There are no dominants in it, which means that it is the most balanced and approximate to the general state of the soil microbiome of ecosystems surrounding the ChNPP. As for the sample, taken from the spot, where the dose rate was the highest, total number of species represented appeared eight times smaller, but dominance index was the highest, which indicates the formation of distinct microbiome dominants.

  1. Simulator training and human factor reliability in Kozloduy NPP, Bulgaria

    International Nuclear Information System (INIS)

    Stoychev, Kosta

    2007-01-01

    15,16 project. Procedures for processing and implementation of full-scale simulator data for specifying human reliability were developed, applying the HEART quantification technique. Analysis of human reliability, HEART, includes data on human factor and does not require detailed dismemberment of the task. It considers only ergonomic and related to the task factors that could impact human performance negatively. The probability of failure of the task takes into consideration a probable restoration from the error, that is deemed possible for every task. It takes into consideration contribution of cognitive errors and response errors. The full scope simulator at Kozloduy NPP is very successfully used to analyze events, occurred at this or other NPPs with water-water reactors, as well as to develop simulator scenarios and corrective measures to prevent similar events in the future at Kozloduy. Two slides are shown to illustrate the analysis of an event, occurred at KNPP Unit 5 on March 01, 2006, related to loss of a reactor coolant pump and a problem subsequently discovered with Reactor Control System. Finally, the paper presents the future of Nuclear in Bulgaria, particularly, the project for construction of a new NPP at Belene, on Danube River

  2. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  3. Knowledge Management and Organizational Proficiency with NPP

    International Nuclear Information System (INIS)

    Marler, M.

    2016-01-01

    Full text: The pace of new NPP construction, startup, and operation is straining the supply of proficient operators, technicians, and engineers. This technical brief explains an approach implemented by a US nuclear utility to capture and transfer knowledge possessed by proficient workers to new workers using the VISION learning content management system. This approach could also be used to accelerate worker proficiency in new NPP organizations. (author

  4. Safeguards at Kozloduy NPP - Experience and expectations

    International Nuclear Information System (INIS)

    Elenkov, Todor

    2001-01-01

    Bulgaria is a party of Non Proliferation Treaty since 5 September 1969. The agreement between IAEA and Bulgaria - INFCIRC 178 - has been in force since 29 February 1972. At that time Bulgaria had one research reactor IRT-2000 in Sofia and two power reactors of WWER-440 type under construction. Now at Kozloduy NPP site there are 4 facilities, which consist of 4 WWER-440 and 2 WWER-1000 type power reactors, producing almost 50% of the electricity in Bulgaria and 1 wet away from reactor spent fuel storage. In 1991 under the green movements and social pressure, the research reactor in Sofia was closed and the construction of the second NPP in Belene with 2 WWER-1000 type reactors was halted. After the transfer in 1994 of the fresh fuel from the research reactor to Kozloduy due to security reasons practically NPP Kozloduy remains the only significant (from safeguards point of view) nuclear site in Bulgaria. In 1972 a 'Nuclear Fuel' group was formed at the Physicists Department in NPP Kozloduy with responsibilities to carry out for safeguards records and reports, fresh and spent fuel transport and control. In 1990 this group was transferred to the Safety Section and since 1992 it exists as 'Control and Accounting for of the Nuclear Materials' - a section in the Safety Department. Currently the section serves all four facilities in NPP Kozloduy and has four people: section head, chief inspector and two inspectors. The main activities of the section include: a) Control of the nuclear fuel location as well as meeting the storage and transport conditions regulations; b) Control of the conditions for normal operations of the installed IAEA surveillance systems; c) Preparation of documents for licensing of fresh and spent nuclear fuel transport; d) Preparation of the official information on nuclear materials location and quantity; e) Preparation of accounting records and the reports for IAEA (ICR, PIL, MBR); f) Co-ordination of the IAEA safeguards inspection activities at NPP

  5. Attitude of the population and students to further construction of NPP

    International Nuclear Information System (INIS)

    Machacek, Ladislav

    1993-01-01

    This presentation shows the public opinion poll young people on NPP in the Slovakia i.e. comparative research results on Attitude of the Slovak population (1991 - a sample 1104 respondents, and Slovak students 1992 - a sample 291 respondents) to the nuclear energy and NPP; Source of information about NE and NPP, motivation of apprehensions of young people concerning NE; what meaning for young people have the arguments FOR and AGAINST construction of NPP in Slovakia; whom students from Bratislava believe during discussions about NE

  6. New trends in designing NPP control boards

    International Nuclear Information System (INIS)

    Kondrat'ev, V.V.

    1981-01-01

    A short analytical summary of the latest developments and future trends in designing NPP control boards is given. The designs of the Westinghause and the Hynkley-Point NPP control boards are described in detail. The essence of the advanced control board concept consists , firstly, in expanded use of computer-controlled displays for the sake of reducing the content of unimportant information presented to an operator, and, secondary, in better account of human possibilities to convert the NPP operation information into a more suitable form. An enlarged use of the direct digital reactor control utilizing microprocessors is expected. Besides, the employment of full-scale control board mock-ups and information desks as well as testing newly-developed control boards at computer reactor simulators are concluded to be used at all-growing rate [ru

  7. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  8. Qinshan NPP large break LOCA safety analysis

    International Nuclear Information System (INIS)

    Shi Guobao; Tang Jiahuan; Zhou Quanfu; Wang Yangding

    1997-01-01

    Qinshan NPP is the first nuclear power plant in the mainland of China, a 300 MW(e) two-loop PWR. Large break LOCA is the design-basis accident of Qinshan NPP. Based on available computer codes, the own analysis method which complies with Appendix k of 10 CFR 50 has been established. The RELAP4/MOD7 code is employed for the calculations of blowdown, refill and reflood phase of the RCS respectively. The CONTEMPT-LT/028 code is used for the containment pressure and temperature analysis. The temperature transient in the hot rod is calculated using the FRAP-6T code. Conservative initial and functional assumptions were adopted during Qinshan NPP large break LOCA analysis. The results of the analysis show the applicable acceptance criteria for the loss-of-coolant accident are met

  9. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  10. Irradiation Embrittlement Monitoring Programs of RPV's in the Slovak Republic NPP's

    International Nuclear Information System (INIS)

    Kupca, Ludovik

    2006-01-01

    Four types of surveillance programs were (are) realized in Slovak NPP's: 'Standard Surveillance Specimen Program' (SSSP) was finished in Jaslovske Bohunice V-2 Nuclear Power Plant (NPP) Units 3 and 4, 'Extended Surveillance Specimen Program' (ESSP), was prepared for Jaslovske Bohunice NPP V-2 with aim to validate the SSSP results, For the Mochovce NPP Unit 1 and 2 was prepared completely new surveillance program 'Modern Surveillance Specimen Program' (MSSP), based on the philosophy that the results of MSSP must be available during all NPP service life, For the Bohunice V-1 NPP was finished 'New Surveillance Specimen Program' (NSSP) coordinated by IAEA, which gave arguments for prolongation of service life these units for minimum 20 years, New Advanced Surveillance Specimen Program (ASSP) for Bohunice V-2 NPP (units 3 and 4) and Mochovce NPP (units 1, 2) is approved now. ASSP is dealing with the irradiation embrittlement of heat affected zone (HAZ) and RPV's austenitic cladding, which were not evaluated till this time in surveillance programs. SSSP started in 1979 and was finished in 1990. ESSP program started in 1995 and will be finished in 2007, was prepared with aim of: increasing of neutron fluence measurement accuracy, substantial improvement the irradiation temperature measurement, fixed orientation of samples to the centre of the reactor core, minimum differences of neutron dose for all the Charpy-V notch and COD specimens, the dose rate effect evaluation. In the year 1996 was started the new surveillance specimen program for the Mochovce RPV's unit-1 and 2, based on the fundamental postulate - to provide the irradiation embrittlement monitoring till the end of units operation. The 'New Surveillance Specimen Program' (NSSP) prepared in the year 1999 for the Bohunice V-1 NPP was finished in the year 2004. Main goal of this program was to evaluate the weld material properties degradation due to the irradiation and recovery efficiency by annealing too. The

  11. Medical and biological aspects of ionizing radiation influence in consequence with accident at ChNPP

    International Nuclear Information System (INIS)

    Shidlovs'ka, T.A.

    2011-01-01

    This monograph presents the issues on systematic influence of ionizing radiation on the biological systems. The results of personal complex studies because of influence of ionizing radiation in consequence with accident at ChNPP on auditory analyzer, creating voice, cardiovascular system and central nervous system are submitted.

  12. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  13. Procedure for Application of Software Reliability Growth Models to NPP PSA

    International Nuclear Information System (INIS)

    Son, Han Seong; Kang, Hyun Gook; Chang, Seung Cheol

    2009-01-01

    As the use of software increases at nuclear power plants (NPPs), the necessity for including software reliability and/or safety into the NPP Probabilistic Safety Assessment (PSA) rises. This work proposes an application procedure of software reliability growth models (RGMs), which are most widely used to quantify software reliability, to NPP PSA. Through the proposed procedure, it can be determined if a software reliability growth model can be applied to the NPP PSA before its real application. The procedure proposed in this work is expected to be very helpful for incorporating software into NPP PSA

  14. Ignalina NPP Safety Analysis: Models and Results

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Research directions, linked to safety assessment of the Ignalina NPP, of the scientific safety analysis group are presented: Thermal-hydraulic analysis of accidents and operational transients; Thermal-hydraulic assessment of Ignalina NPP Accident Localization System and other compartments; Structural analysis of plant components, piping and other parts of Main Circulation Circuit; Assessment of RBMK-1500 reactor core and other. Models and main works carried out last year are described. (author)

  15. Radionuclide localization at the Chernobyl' NPP territory

    International Nuclear Information System (INIS)

    Mamaev, L.A.; Galkin, G.A.; Khrabrov, S.L.; Polyakov, A.S.; Mikhejkin, S.V.

    1989-01-01

    Experience is generalized of using different dust suppression (DS) compounds during Chernobyl' accident consequence elimination. Polymer DS compounds were used at the NPP operating site; the compounds kept dust-like radioactive contaminations during 1-2 months. DS at the country was realized by means of the compound on base of latex. The conclusion is made that the DS measures improved radiation situation in the NPP zone. 7 refs

  16. Preparation of Long Term Operation in Dukovany NPP, Czech Republic

    International Nuclear Information System (INIS)

    Krivanek, R.; Sabata, M.

    2012-01-01

    Dukovany NPP in the south-east of the Czech Republic operates four VVER 440/213 type units. The first unit was commissioned in 1985 and the last one in 1987. The operational results of the whole NPP have been excellent and NPP permanently belongs between the first quartile of the best operated NPPs in the world in accordance with WANO factors. Large safety improvement programme have been implemented in last 15 years. The original design lifetime of main components is 30 years which means till 2015 and it is understandable that NPP is preparing for long-term operation (LTO). The paper is describing activities carried out and planned for safe and successful LTO. (author)

  17. Low-water considerations for NPP sites

    International Nuclear Information System (INIS)

    Jensen, J.; Frank, T.; Wahl, T.

    2009-01-01

    In the frame of reactor safety considerations flood protection and the evaluation of low-water events are safety relevant issues. Therefore low-water statistics were performed for the coastal region Cuxhaven and the Elbe river estuary. The consideration of the longitudinal profile of water levels during low-tide in connection with surface water effects, morphodynamic changes of the river and anthropogenic modifications is of importance for conclusions concerning the NPP sites in some distance of the reference tide gauge. The authors performed a statistical low-tide analysis for the NPP sites Brunsbuettel and Brokdorf.

  18. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  19. Change in properties of graphite on stake of Obninsk NPP

    International Nuclear Information System (INIS)

    Virgul'ev, Yu.S.; Gundorov, V.V.; Kalyagina, I.P.; Belinskaya, N.T.; Dolgov, V.V.; Komissarov, O.V.; Stuzhnev, Yu.A.

    1997-01-01

    The results of testing the graphite from the AM-1 reactor masonry at the Obninsk NPP for its operation period are discussed. It is shown that the masonry graphite state after 42 years of the reactor operation remains satisfactory in the most cells inspected. Separate cells requiring a repair resulted from oxidation are characterized by strength decreased by several times. The laws of radiation changes in graphite properties are analyzed. The conclusion on possibility of the further masonry operation is drawn

  20. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  1. Reverse osmosis using for water demineralization for supplying the NPP and TPP steam generators

    International Nuclear Information System (INIS)

    Mamet, A.P.; Sitnyakovskij, Yu.A.

    2000-01-01

    Paper analyzes the conditions affecting the efficiency of water reverse-osmosis demineralization for NPP and TPP steam generators and presents an example of efficient application of a membrane reverse-osmosis facility serving as the first stage of water demineralization at the Mosehnergo Joint-Stock Company heating and power plant no. 23 to feed boilers [ru

  2. Generalization of Nuclear Safety and Course of Accident Events Research in the Ignalina NPP

    International Nuclear Information System (INIS)

    Kaliatka, A.; Uspuras, E.

    2001-01-01

    The safety analysis shown that after implementation of SAR recommendations Ignalina NPP is adequately protected against accidents which required fast initiation of automatic protections. In case of accidents with long-term loss of core cooling additional operator actions are required. Accident management in case long-term core cooling are analyzed in this paper. (author)

  3. Russian normative approach to the question of management of NPP life time

    International Nuclear Information System (INIS)

    Karpunin, N.I.

    2002-01-01

    Full text: In Russia, the designated service life of a nuclear power plant (NPP) is 30 years. During the period 2001-2010, 15 Russian NPP units will reach the end of their service life. The 'Basic Provisions of NPP Safety Assurance', OPB-88/97, Item 5.1.14, provide for a possible extension of NPP operation beyond the designated service life. For such an extension, the NPP operating organization must apply for a license renewal to Gosatomnadzor, which needs to specify the relevant requirements. GAN is developing regulatory documents to provide a basis for NPP license renewal/extension of NPP operation, which would benefit from international experience. In accordance with 'The program of Atomic Energy Development in the Russian Federation for 1998-2005 and up to 2010' adopted by Decree No. 815 of the Government of the Russian Federation on 21 July 1998, priority is placed on the preparation of NPPs for extension of service life and on ensuring safety in the extended operating period. The length of the extension beyond the designated service life is to be determined on the basis of a range of technical and economic considerations, including: The ability to ensure and maintain operational safety; Sufficient residual service life of the unit's non-repairable components; The availability of temporary storage facilities for the additional spent nuclear fuel and radioactive waste, or the possibility of its transport off-site; The ability to ensure safe handling of the radioactive waste generated during the extension period; To extend the lifetime of an NPP unit, the plant Operator is required to perform the following tasks: Carry out a comprehensive survey of the NPP unit; Draw up a programme of preparation for lifetime extension; Prepare the NPP unit for operation in the extended period; Carry out the necessary tests. There are also some normative documents, which regulate management of NPP life time. (author)

  4. Observation and modeling of NPP for Pinus elliottii plantation in subtropical China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Based on the stem analysis of 59 individuals of Pinus elliottii in combination with tree biomass models, we calculated annual biomass increment of forest plots at Qianyanzhou Ecological Station, Chinese Academy of Sciences in subtropical China. In addition, canopy layer and community NPP were calcu- lated based on 12 years’ litter fall data. NPP of the 21-year-old forest was estimated by using the BIOME BGC model; and both measured NPP and estimated NPP were compared with flux data. Community biomass was 10574 g·m-2; its distribution patterns in tree layer, shrub layer, herbaceous layer, tree root, herbaceous and shrub roots and fine roots were 7542, 480, 239, 1810, 230, 274 and 239 g·m-2, respectively. From 1999 to 2004, the average annual growth rate and litter fall were 741 g·m-2·a-1 (381.31 gC·m-2·a-1) and 849 g·m?2·a?1 (463 gC·m-2·a-1), respectively. There was a significant corre- lation between annual litter fall and annual biomass increment; and the litter fall was 1.19 times the biomass increment of living trees. From 1985 to 2005, average NPP and GPP values based on BGC modeling were 630.88 (343.31 - 906.42 gC·m-2·a-1) and 1 800 gC·m-2·a-1 (1351.62 - 2318.26 gC·m-2·a-1). Regression analysis showed a linear relationship (R2=0.48) between the measured and simulated tree layer NPP values. NPP accounted for 30.2% (25.6%-32.9%) of GPP, while NEP ac- counted for 57.5% (48.1%-66.5%) of tree-layer NPP and 41.74% (37%-52%) of stand NPP. Soil respi- ration accounted for 77.0% of measured tree NPP and 55.9% of the measured stand NPP. NEE based on eddy covariance method was 12.97% higher than the observed NEP.

  5. ATUCHA I NPP - Emergency drill practice

    International Nuclear Information System (INIS)

    Sanda, Alejandro; Rosales, Gabriel

    2008-01-01

    Full text: Atucha I NPP performs an Emergency Drill Practice once a year. Its main goals are: -) Fulfill the requirements of the Argentine Nuclear Regulatory Authority (ARN) regarding Atucha I NPP's Operating License; -) Fulfill the commitment with the community regarding the safe and reliable operation Atucha I NPP; -) Verify the response of the Civil Organizations, Security Forces, and Armed Forces, as well as the correct application of the Emergency Plan; -) Perform the 'General Alarm Drill' periodic control; -) Perform a re-training of the members of the Security Advisor Internal Committee (CIAS) on the Internal and External Aspects of the Emergency Plan and on the related procedures; -) Test the Emergency Communications System. New goals are added every year, considering the Drill's scope. This drill comprises two different kinds of practices: Internal practices (practices in the station, with our personnel) and external practices (practices outside the station with governmental organizations). Internal practices comprise: -) Internal and external communications practices; -) Acoustic alarms; -) Personnel gathering in the Meeting Points; -) Safety of selected Meeting Points; -) Personnel count, selective evacuation; -) Iodide Potassium pills distribution; -) CICE (Internal Group for Emergency Control) Coordination. External practices comprise: -) Nuclear Regulatory Authority; -) Argentine Navy, Comando Area Naval Fluvial, Base Naval Zarate; -) Lima firemen; -) Zarate firemen; -) Municipal Civil Defense (Zarate and Lima); -) National Guard, Escuadron Atucha; -) Zarate Regional Hospital; -) Lima Police Department; -) Zarate Police Department; -) Argentine Coast Guard, Zarate; -) Local radios: Radio FM Libre, FM El Sitio; -) First Aid clinic. The following activities are performed together with the aforementioned organizations: -) Formation of an 'Operative committee'; -) Evacuation of citizens in a 3 km radio; -) Control of every access to Lima; -) Control of

  6. Choice and complexation of techniques and tools for assessment of NPP I and C systems safety

    International Nuclear Information System (INIS)

    Illiashenko, Oleg; Babeshko, Eugene

    2011-01-01

    There are a lot of techniques to analyze and assess reliability and safety of NPP Instrumentation and Control (I and C) systems (e.g. FMEA - Failure Modes and Effects Analysis and its modifications, FTA - Fault Tree Analysis, HAZOP - Hazard and Operability Analysis, RBD - Reliability Block Diagram, Markov Models, etc.) and quantity of tools based on these techniques is constantly increasing. Known ways of safety assessment, as well as problems of their choice and complexation are analyzed. Objective of the paper is the development of general 'technique of techniques choosing' and tool for support of such technique. The following criteria are used for analysis and comparison and their features are described: compliance to normative documents; experience of application in industry; methods used for assessment of system NPP I and C safety; tool architecture/framework; reporting; vendor support, etc. Comparative analysis results of existing T and T - Tools and Techniques for safety analysis are presented in matrix form ('Tools-Criterion') with example. Features of complexation of different safety assessment techniques (FMECA, FTA, RBD, Markov Models) are described. The proposed technique is implemented as special tool for decision-making. The proposed technique was used for development of RPC Radiy company standard CS 66. This guide contains requirements and procedures of FMECA analysis of developed and produced NPP I and C systems based on RADIY platform. (author)

  7. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  8. Review of accident analyses performed at Mochovce NPP

    International Nuclear Information System (INIS)

    Siko, D.

    2000-01-01

    In this paper the review of accident analysis performed in NPP Mochovce V-1 is presented. The scope of these safety measures was defined and development in the T SSM for NPP Mochovce Nuclear Safety Improvements Report' issued in July 1995. The main objectives of these safety measures were the followings: (a) to establish the criteria for selection and classification of accidental events, as well as defining the list of initiating events to be analysed. Accident classification to the individual groups must be performed in accordance with RG 1.70 and IAEA recommendations 'Guidelines for Accidental Analysis of WWER NPP' (IAEA-EBR-WWER-01) to select boundary cases to be calculated from the scope of initiating events; (b ) to elaborate the accident analysis methodology that also includes acceptance criteria for their result evaluation, initial and boundary conditions, assumption related with the application of the single failure criteria, requirements on the analysis quality, used computer codes, as well as NPP models and input data for the accident analysis; (c) to perform the accident analysis for the Pre-operational Safety Report (POSAR); (d) to provide a synthetic report addressing the validity range of codes models and correlations, the assessment against relevant tests results, the evidence of the user qualification, the modernisation and nodding scheme for the plant and the justification of used computer codes. Analyses results showed that all acceptance criteria were met with satisfactory margin and design of the NPP Mochovce is accurate. (author)

  9. The Bohunice NPP V-1 units nuclear safety upgrading

    International Nuclear Information System (INIS)

    Mlcuch, M.

    2000-01-01

    Safety upgrading and operational reliability improvement was carried out by the Bohunice NPP V-1 staff continuously since the plant commissioning. By now, more than 1200 minor or major modifications have been implemented, either by the NPP maintenance staff or by the contractors. Based on findings of safety assessment missions invited by Bohunice NPP in 1990 - 1991, the Czecho-slovak Nuclear Regulatory Authority (CSKAE) issued the decision No. 5/91 of 81 safety upgrading measures to be taken in different areas. These improvements are referred to as the 'Small Reconstruction of the Bohunice V-1 NPP'. Realization of measures during Small reconstruction of the Bohunice NPP V-1 became a power plant, which further operation is acceptable from safety point of view, but it is also necessary further safety improvement. During the period of the Small Reconstruction the development of a Safety Report for the Gradual reconstruction has been completed. Based on this report the SR Nuclear Regulatory Authority issued the Decision No. 1/94, in which requires 59 upgrading measures in different areas to be addressed. The development of Basic Engineering of the Gradual Reconstruction has been contracted to the Siemens AG. Implementation of safety measures are provided through contract with the consortium REKON (which consists of Siemens AG company and Nuclear Power Plants Research Institute Trnava) and other Czech, Russian and Slovak companies. The Gradual Reconstruction of Bohunice NPP V-1 will be finished in 2000. By implementation of the measures carried out during Gradual Reconstruction achievement of an internationally acceptable nuclear safety level will be reached. (author)

  10. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  11. The final report of the state scientific programme 'Ignalina NPP and the Environment'

    International Nuclear Information System (INIS)

    1998-03-01

    The final report of the State Scientific Programme 'Ignalina NPP and the Environment' includes the generalised research material on the after effects of Ignalina NPP operation upon natural environment and social processes. The data on changes of thermal state and water balance of lake Drukshiai; the effect of permanent thermal and chemical pollution on the water chemical composition and hydrochemical regime; the geochemical - contaminated state; the condition, dynamics and changes of hydrobiont communities in lake Drukshiai; the bio indication of ecological effects; the toxic and genotoxic influence of Ignalina NPP waste waters and lake Drukshiai water as well as bottom sediments; the state and dynamic of landscape ecosystem components of Ignalina NPP region; the radionuclides in Ignalina NPP area, the medical and biological studies in the Ignalina NPP influence population zone; the impact of Ignalina NPP on social territorial processes in the region are presented. Radioecological and ecotoxilogical state of Ignalina NPP region and lake Drukshiai is estimated as well as changes in lake Drukshiai and Ignalina NPP surrounding area ecosystems under the combine anthropogenic of the plant influence are elucidated. The final report contains the results of final report by the executors of the tasks and themes of the Programme which have been obtained since the beginning of the implementation of the Programme as well as generalising conclusions and recommendations. (author)

  12. Calculation of the real states of Ignalina NPP Unit 1 and Unit 2 RBMK-1500 reactors in the verification process of QUABOX/CUBBOX code

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.; Demcenko, M.

    2001-01-01

    Calculations of the main neutron-physical characteristics of RBMK-1500 reactors of Ignalina NPP Unit 1 and Unit 2 were performed, taking real reactor core states as the basis for these calculations. Comparison of the calculation results, obtained using QUABOX/CUBBOX code, with experimental data and the calculation results, obtained using STEPAN code, showed that all the main neutron-physical characteristics of the reactors of Unit 1 and Unit 2 of Ignalina NPP are in the safe deviation range of die analyzed parameters, and that reactors of Ignalina NPP, during the process of the reactor core composition change, are operated in a safe and stable manner. (author)

  13. Nuclear fuel operation at Balakovo NPP

    International Nuclear Information System (INIS)

    Morozov, A.

    2015-01-01

    The presentation addressed the positive experience of the TVS-2M assemblies implementation at Balakovo NPP in 18 month fuel cycles, at uprated power (104%) and the usage of the axial profiled Gd-rods in order to minimize the power peaking factors and linear heat rate in the upper part in some of the fuel rods. The results of the test operation of fuel rods with different claddings, made by E110M, E125 and E635M alloys at Balakovo NPP were also provided. The recently observed problem with the “white crust” on the cladding surfaces was also discussed

  14. Lifetime evaluation of Bohunice NPP components

    International Nuclear Information System (INIS)

    Kupca, L.

    2001-01-01

    The paper discuss some aspects of the main primary components lifetime evaluation program in Bohunice NPP which is performed by Nuclear Power Plant Research Institute (NPPRI) Trnava in cooperation with Bohunice and other organizations involved. Facts presented here are based on the NPPRI research report which is regularly issued after each reactor fuel campaign under conditions of project resulted from the contract between NPPRI and Bohunice NPP. For the calculations, there has been used some computer codes adapted (or made) by NPPRI and the results are just the conclusive and very brief, presented here in Tables (Figures). (authors)

  15. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  16. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  17. Analysis of the current status of measuring chains of the in-service diagnosis system at the Dukovany NPP

    International Nuclear Information System (INIS)

    Stulik, P.; Sipek, B.

    2006-02-01

    The following systems were analyzed for the Dukovany NPP: Monitoring of primary circuit and reactor vibrations; Detection of loose parts; Main coolant pump diagnosis; Reactor internals diagnosis; and Turbogenerator status monitoring. Recommendations were derived from the findings. (P.A.)

  18. Natural vibration experimental analysis of Novovoronezhskaya NPP main building

    International Nuclear Information System (INIS)

    Zoubkov, D.; Isaikin, A.; Shablinsky, G.; Lopanchuk, A.; Nefedov, S.

    2005-01-01

    1. Natural vibration frequencies are main characteristics of buildings and structures which allow to give integral estimation of their in-service state. Even relatively small changes of these frequencies as compared to the initially registered values point to serious defects of building structures. In this paper we analyzed natural vibration frequencies and natural modes of the main building (MB) of Novovoronezhskaya NPP operating nuclear unit with WWER-440 type reactor. The MB consists of a reactor compartment (RC), a machine room (MR) and an electric device (ED) unit positioned in between. 2. Natural vibration frequencies and natural modes of the MB were determined experimentally by analyzing its microvibrations caused by operation of basic equipment (turbines, pumps, etc.). Microvibrations of the main building were measured at 12 points. At each point measurements were carried out along two or three mutually perpendicular vibration directions. Spectral analysis of vibration records has been conducted. Identification of natural vibration frequencies was carried out on the basis of the spectral peaks and plotted vibration modes (taking into account operating frequencies of the basic equipment of the power generating unit). On the basis of the measurement results three transverse modes and corresponding natural vibration frequencies of the MB, one longitudinal mode and corresponding natural vibration frequency of the MB and two natural frequencies of vertical vibrations of RC and MR floor trusses (1st and 2nd symmetric forms) were determined. Dynamic characteristics of the main building of NV NPP resulting from full scale researches are supposed to be used as one of building structure stability criteria. (authors)

  19. Evaluation of the atmospheric transport modeling tools used at the Ignalina NPP

    International Nuclear Information System (INIS)

    Jasiulionis, R.

    2004-01-01

    The atmospheric transport modeling system at the Ignalina NPP is part of the radionuclide monitoring system and is designed to help associate radionuclide network signals with possible source regions. The evaluation of the Atmospheric Transport Modeling Tools Used at the Ignalina NPP was based on results published in last years. The model based on semi-empirical formulae of turbulent diffusion in the air and local meteorological data were used for calculation of concentration of radionuclides emitted through the Ignalina NPP stack. Meteorological data (wind velocity and direction as well as temperature at a height of 2 and 30 meters) were obtained from the meteorological station of the Ignalina NPP at Visaginas. Using the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model, trajectories of air masses transport to the Ignalina NPP region (56.55 N, 26.57 E) during 95 hours at heights of 100, 500 and 1000 m were calculated. The dispersion in the ground-level air of emissions through the Ignalina NPP stack can also be calculated using the HYSPLIT model. The data on the radionuclide activity concentrations in the air at the measurements site and results of calculation can used for the establishment of their field in the Ignalina NPP region. (author)

  20. Assessment of NPP VIIRS Ocean Color Data Products: Hope and Risk

    Science.gov (United States)

    Turpie, Kevin R.; Meister, Gerhard; Eplee, Gene; Barnes, Robert A.; Franz, Bryan; Patt, Frederick S.; Robinson, Wayne d.; McClain, Charles R.

    2010-01-01

    For several years, the NASA/Goddard Space Flight Center (GSFC) NPP VIIRS Ocean Science Team (VOST) provided substantial scientific input to the NPP project regarding the use of Visible Infrared Imaging Radiometer Suite (VIIRS) to create science quality ocean color data products. This work has culminated into an assessment of the NPP project and the VIIRS instrument's capability to produce science quality Ocean Color data products. The VOST concluded that many characteristics were similar to earlier instruments, including SeaWiFS or MODIS Aqua. Though instrument performance and calibration risks do exist, it was concluded that programmatic and algorithm issues dominate concerns. Keywords: NPP, VIIRS, Ocean Color, satellite remote sensing, climate data record.

  1. The Ignalina NPP and Y2K Problem

    International Nuclear Information System (INIS)

    Medeliene, D.

    2000-01-01

    Work on preparing the hardware and software of the Ignalina NPP for the year 2000 was started in December 1998. First of all, a Y2K project team was formed comprising 29 specialists. Some of these are the most experienced computer specialist, others co-ordinate work on the Y2K problem at the divisions of the NPP using computers or microprocessors. The project head was appointed and the schedule of work confirmed. In accordance with the schedule, the work was divided into twelve stages. The results showed that the preparations were adequate. On the New Year night the specialists of the Ignalina NPP Emergency Operation Centre worked together with the managers of the plant. Relation with other Lithuanian and international organisations was established. No any Y2K related event happened

  2. The local impacts of Borssele NPP closing down

    International Nuclear Information System (INIS)

    Mandos, J.L.

    2000-01-01

    The municipal council of Borsele considers that the use of nuclear energy is a question of national policy, but considers itself responsible for town and country planning, safety and employment. The two latter aspects are especially significant if plans for shutdown are concerned. Confidence in safety of the NPP in Borsele has increased in recent years due to transparent information policy of the power plant itself as well as the local government and most of the employees living in the area. If considering the circumstances under which the decision about the closure of NPP one could sees this is a purely political decision. The local government will continue the close cooperation with the National government and the Parliament in solving the problem of employment and social impact of NPP shutdown

  3. Technical innovations at NPP Dukovany - for safe and efficient operation

    International Nuclear Information System (INIS)

    Sabata, M.; Vasa, I.

    2000-01-01

    Inherent features of the NPP Dukovany design provide a significant confidence in its nuclear safety assurance; among these features should be emphasised the reactor core stability and its control and protection system capability to hold the reactor in safe state following scram or accident conditions. Nevertheless, NPP Dukovany was designed in the early seventies, and current requirements for nuclear safety assurance are more strict and/or specific as a result of the technical development and lessons learned from nuclear accidents. The paper compares the safety design base established at the time of NPP Dukovany project implementation and the current reference design base. The paper also presents procedures applied to implement technical and operational measures which are introduced to fulfil the current basic safety criteria. The scope of such measures applied at NPP Dukovany is compared with that of EU countries introduced for the same reason - to meet the updated safety related requirements. Examples of some innovations already implemented or under implementation give an idea how NPP Dukovany proceeds in reaching the goal of harmonising its safety with the requirements to be met before the Czech Republic becomes a member country of the European Union. (author)

  4. Radiological impact on the surrounding area of Cernavoda NPP operation

    International Nuclear Information System (INIS)

    Busnita, M.; Penescu, M.; Neacsu, L.; Ion, M.; Moldoveanu, E.

    1996-01-01

    The objective of this paper is to present the protective measures provided to Cernavoda NPP for population and environment in case of normal operation and accidental situations. The paper describes the nuclear safety concept with the two aspects, the technical safety and the radiation protection, respectively, which represent the theoretical basis of the NPP design, construction and operation. The assessment of the potential radiological effects of Cernavoda NPP operation on the population and other environmental factors have been done by using the following input data: the natural and social characteristics of the site and the technical characteristics of the plant. The effects of Cernavoda NPP operation are also exposed in health risks which are compared with the daily risks of the population exposed of the natural phenomena or to the activities like transportation, domestics or industrial. (author). 1 tab., 6 refs

  5. Current status of NPP generation IV

    International Nuclear Information System (INIS)

    Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila; Arief Tris Yuliyanto

    2013-01-01

    Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainability and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia. (author)

  6. A reliability evaluation method for NPP safety DCS application software

    International Nuclear Information System (INIS)

    Li Yunjian; Zhang Lei; Liu Yuan

    2014-01-01

    In the field of nuclear power plant (NPP) digital i and c application, reliability evaluation for safety DCS application software is a key obstacle to be removed. In order to quantitatively evaluate reliability of NPP safety DCS application software, this paper propose a reliability evaluating method based on software development life cycle every stage's v and v defects density characteristics, by which the operating reliability level of the software can be predicted before its delivery, and helps to improve the reliability of NPP safety important software. (authors)

  7. Knowledge management in the NPP domain

    International Nuclear Information System (INIS)

    Nilsen, Svein; Bisio, Rossella; Ludvigsen, Jan Tore

    2004-03-01

    This report gives an outlook on Knowledge Management (KM) activities within NPP related establishments as of today. There may be less activity in the NPP world as compared to many other industrial sectors. Still there is an awakening within the NPP industry demanding that KM should be attended to at a larger scale. The most notable reason for this is maybe an imminent increase in the number of people going into retirement. The types of establishments involved cover the major kinds such as utilities, research institutes and worldwide nuclear organizations. The report sums up a few of those efforts that are presently being implemented. Moreover the report looks at general advancements within the field of knowledge management. Simply stated the endeavours belong to either one of two classes. The first class emphasize the use of technology to solve knowledge management problems. The second class regard knowledge management as a problem pertaining to human factors and organizational issues. This report maintain that knowledge management initiatives should make due considerations to both perspectives. This report also sums up the Halden Reactor Project short term KM initiative. (Author)

  8. Medical consequences of NPP and TPP operation

    International Nuclear Information System (INIS)

    Bliznakov, V.

    1996-01-01

    Results from a comparative analysis of health conditions of the staff in the Kozloduy NPP and the Maritsa Iztok TPP are reported. It is found that the general disease incidence with temporary incapacity for work of Kozloduy workers is lower than those data for the workers at thermal power stations. The incidence of some social diseases like neoplasms, TBC, hypertension, ischemia etc. is also lower for the staff of NPP. No cases of radiation injuries have been registered for a period of 21 years

  9. Database for Pressure Tube Diameter and Operation Data of Wolsong NPP

    International Nuclear Information System (INIS)

    Jung, Jong Yeob; Kim, W. Y.; Bae, J. H.; Park, J. H.

    2010-12-01

    Pressure tube of CANDU reactor which is a long cylindrical shape of its diameter about 10 cm and length of about 6m, can be expanded toward both radial and axial directions due to irradiation under the high pressure and temperature condition. As the irradiation period increases, the radial expansion due to creep of the pressure tube increases. The radial expansion of the pressure tube comes out the reduction of the coolability and it results in the power deration. The objectives of the current work is to establish the database for the measured diametral data of pressure tube and operational data from Wolsong NPP as a preliminary work of developing the prediction model for pressure tube diameter. In order to develop the database, measured data for total 86 channels were collected from Wolsong NPP 1, 2, 3 and 4 and analyzed. Based on the provided data, the operational conditions such as an axial temperature and a pressure of the channel and neutron fluxes were derived. All data were analysed to derive the correlation between the pressure tube diameter and the other operational parameters

  10. International Conference of Ukrainian Nuclear Society ''NPP's safety and protection''(annotations)

    International Nuclear Information System (INIS)

    Barbashev, S.V.

    1997-01-01

    The abstracts of reports submitted to the Conference include: - New developments of the safe nuclear installations; - NPP ecological safety; - Methods of personnel and population protection; - Waste management safety (at transportation, processing and storage); - Spent nuclear fuel management; - NPP life extension and decommissioning; - Public opinion as an element of NPP safety; - Training of personnel, scientific support and safety culture; - Forecasting of nuclear power and industry safe development; - Development of international cooperation in nuclear power

  11. Quantitative analysis of psychological personality for NPP operators

    International Nuclear Information System (INIS)

    Gao Jia; Huang Xiangrui

    1998-01-01

    The author introduces the relevant personality quantitative psychological research work carried out by 'Prognoz' Laboratory and Taiwan, and presents the primary results of the research for Chinese Nuclear Power Plant (NPP) operator's psychological personality assessment, which based on the survey of MMPI, and presents the main contents for the personality quantitative psychological research in NPP of China. And emphasizes the need to carry out psychological selection and training in nuclear industry

  12. Grassland Npp Monitoring Based on Multi-Source Remote Sensing Data Fusion

    Science.gov (United States)

    Cai, Y. R.; Zheng, J. H.; Du, M. J.; Mu, C.; Peng, J.

    2018-04-01

    Vegetation is an important part of the terrestrial ecosystem. It plays an important role in the energy and material exchange of the ground-atmosphere system and is a key part of the global carbon cycle process.Climate change has an important influence on the carbon cycle of terrestrial ecosystems. Net Primary Productivity (Net Primary Productivity)is an important parameter for evaluating global terrestrial ecosystems. For the Xinjiang region, the study of grassland NPP has gradually become a hot issue in the ecological environment.Increasing the estimation accuracy of NPP is of great significance to the development of the ecosystem in Xinjiang. Based on the third-generation GIMMS AVHRR NDVI global vegetation dataset and the MODIS NDVI (MOD13A3) collected each month by the United States Atmospheric and Oceanic Administration (NOAA),combining the advantages of different remotely sensed datasets, this paper obtained the maximum synthesis fusion for New normalized vegetation index (NDVI) time series in 2006-2015.Analysis of Net Primary Productivity of Grassland Vegetation in Xinjiang Using Improved CASA Model The method described in this article proves the feasibility of applying data processing, and the accuracy of the NPP calculation using the fusion processed NDVI has been greatly improved. The results show that: (1) The NPP calculated from the new normalized vegetation index (NDVI) obtained from the fusion of GIMMS AVHRR NDVI and MODIS NDVI is significantly higher than the NPP calculated from these two raw data; (2) The grassland NPP in Xinjiang Interannual changes show an overall increase trend; interannual changes in NPP have a certain relationship with precipitation.

  13. Management of safety culture

    International Nuclear Information System (INIS)

    Kavsek, D.

    2004-01-01

    The strengthening of safety culture in an organization has become an increasingly important issue for nuclear industry. A high level of safety performance is essential for business success in intensely competitive global environment. This presentation offers a discussion of some principles and activities used in enhancing safety performance and appropriate safety behaviour at the Krsko NPP. Over the years a number of events have occurred in nuclear industry that have involved problems in human performance. A review of these and other significant events has identified recurring weaknesses in plant safety culture and policy. Focusing attention on the strengthening of relevant processes can help plants avoid similar undesirable events. The policy of the Krsko NPP is that all employees concerned shall constantly be alert to opportunities to reduce risks to the lowest practicable level and to achieve excellence in plant safety. The most important objective is to protect individuals, society and the environment by establishing and maintaining an effective defense against radiological hazard in the nuclear power plant. It is achieved through the use of reliable structures, components, systems, and procedures, as well as plant personnel committed to a strong safety culture. The elements of safety culture include both organizational and individual aspects. Elements commonly included at the organizational level are senior management commitment to safety, organizational effectiveness, effective communication, organizational learning, and a culture that encourages identification and resolution of safety issues. Elements identified at the individual level include personal accountability, a questioning attitude, communication, procedural adherence, etc.(author)

  14. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  15. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  16. Does Dual Ownership of Waste Imply a Regional Disposal Approach?

    International Nuclear Information System (INIS)

    Mele, I.

    2006-01-01

    The construction of the Nuclear Power Plant Krsko, being located in Slovenia near the Slovenian-Croatian border, was a joint investment by Slovenia and Croatia, two republics of the former Yugoslavia. The plant was completed in 1981 and the commercial operation started early in 1983. The obligations and rights of both investors during the construction and operation were specified in two bilateral contracts signed in 1974 and 1982. These contracts were fairly detailed on construction, operation and exploitation of the nuclear power plant (NPP), but they said very little about future nuclear liabilities. The electricity production was equally shared between the two countries and both parties participated in management of the NPP. In 1991, after Slovenia and Croatia became two independent countries, the agreement on the ownership and exploitation of the NPP Krsko was re-negotiated and a new contract signed in 2003. By the new contract the decommissioning and the disposal of spent fuel (SF) as well as low and intermediate level waste (LILW) is the responsibility of both parties, and the financial resources for covering these liabilities should be equally provided. Regardless of shared ownership of waste, the agreement opts for a single disposal solution for LILW as well as for SF, but the details are left open. More clear elaboration of these responsibilities is given in the programme of the decommissioning and disposal of radioactive waste from the NPP which was jointly prepared by the Slovenian and Croatian waste management organisations in 2004. The programme is clearly opting for only one repository for LILW and one repository for spent fuel, which can be located either in Slovenia or Croatia. Irrespective of the country where such a repository will be sited, dual ownership of waste opens up another dimension of such a solution: will such a repository be regarded as a national facility or as a regional or multinational facility? Both options-national and regional

  17. Estimation of efficiency of dust suppressing works at 30-km zone near the Chernobyl' NPP

    International Nuclear Information System (INIS)

    Bakin, R.I.; Tkachenko, A.V.; Sukhoruchkin, A.K.

    1989-01-01

    Data on efficiency of dust suppressing works at 30-km zone near NPP are analyzed. It is necessary: to reduce radionuclide content in the air in the spring, when the weather is dry, to conduct dust suppressing works on roads and sections of surface with nonfixed ground; in the summer, to wash roads every day. 3 figs

  18. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  19. Programmes design for Bohunice NPP personnel other than control room operators

    International Nuclear Information System (INIS)

    Kalincik, L.

    2002-01-01

    This paper deals with project development of training programmes for non-licenced NPP personnel-masters, field operators, maintenance and technical supporting personnel. The programme development focuses on the part stage and on the job training at NPP. Bohunice NPP belongs to plants with higher specific number of personnel per installed power capacity. This factor also influenced the choice of programmes design. Undermentioned procedure is one of various approaches to SAT exploitation for training programmes design. (author)

  20. Radioactive waste problems in the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Videnov, N; Stanchev, V [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An average volume of 1400 m{sup 3} a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed.

  1. Radioactive waste problems in the Kozloduy NPP

    International Nuclear Information System (INIS)

    Videnov, N.; Stanchev, V.

    1995-01-01

    An average volume of 1400 m 3 a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed

  2. Knowledge management during decommissioning of Chornobyl NPP

    International Nuclear Information System (INIS)

    Gora, A.D.; Kuchinskij, V.K.; Stel'makh, D.A.; Tsivun, T.A.

    2010-01-01

    The article deals with issues on knowledge management during decommissioning by the example of the Chornobyl NPP. This includes how the duration of decommissioning stage, change in organization goal and final state of the site influence on human resources and knowledge management system. The main attention is focused on human assets and intellectual strength of Chornobyl NPP. Mathematical dependencies are proposed to substantiate numerical values. An analysis is given for the current situation, and forecast estimates for values dynamics is performed. The conclusion gives solutions on providing experienced staff in the future.

  3. Shock absorber in Ignalina NPP

    International Nuclear Information System (INIS)

    Bulavas, A.; Muralis, J.

    1996-09-01

    Theoretical calculation and experimental analysis of models of shock absorber in Ignalina NPP is presented. The results obtained from the investigation with model of shock absorber coincide with the theoretical calculation. (author). 2 figs., 3 refs

  4. Framatome Contribution to Chinese NPP Development and Standardization

    International Nuclear Information System (INIS)

    Charbonneau, S.

    1996-01-01

    First discussions in 1978 between Framatome and Chinese authorities about the supply of an NPP were successfully concluded in 1986 by the signature of the supply contracts (nuclear islands, conventional islands, nuclear fuel assemblies, and project management assistance) for the Daya Bay NPP. Since then teams of engineers and technicians from Framatome and other French companies, and from relevant Chinese institutes and agencies have gotten to know each other better and have deepened their relationships

  5. Computerized systems of NPP operators support. (Psychological problems)

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1995-01-01

    Operator psychological problems arising in the work with NPP operators support computerized systems (OSCS) are considered. The conclusion is made that the OSCS intellectual application will bring the operator into dangerous dependence on his computerized assistant. To avoid this danger it is necessary by creation of the OSCS to divide specially the tasks areas of the operator and OSCS in order to assure the active role of the operator in the NPP control

  6. Morbidity with temporary disability in Kozloduy NPP workers

    International Nuclear Information System (INIS)

    Dobreva, B.; Novkirishki, V.

    1993-01-01

    Changes with time in indicators of disease incidence with temporary disability in Kozloduy NPP personnel have been studied for the period 1974-1991. The data were compared with those for 'Sofia-Iztok' TPP. The causes contributing to formation of the indicators of frequency, severity, and average duration were examined. No temporary disability because of radiation exposure has been recorded. As a whole, less temporary disability has been found at NPP than at TPP. (author)

  7. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  8. NPP estimation and seasonal change research of Gansu province in northwest China

    Science.gov (United States)

    Han, Tao; Wang, Dawei; Hao, Xiaocui; Jiang, Youyan

    2018-03-01

    Based on GIS and remote sensing technology, this paper estimates the NPP of the 2015 year-round and every season of Gansu province in northwest China by using the CASA(Carnegie Ames Stanford Approach) light energy utilization model. The result shows that the total annual NPP of Gansu province gradually decline from southeast to northwest in the space, which is in accordance with the water and heat condition in Gansu province. The results show that the summer NPP in Gansu Province is the maximum in each season. The maximum value of summer NPP in Gansu Province reached 695 (gCm-2•season-1), and the maximum value was 473 in spring, and 288 in the autumn, and the NPP in the winter in Gansu province were under 60. The fluctuation range of NPP value is large, this is due to the diversity of ecosystem types in Gansu province, including desert, grassland, farmland and forest, among them, the grassland area is the largest, and the grassland type is very diverse, the grassland coverage is obviously different, especially the low coverage grassland growth is affected by precipitation and temperature and other meteorological factors obviously.

  9. Development of NPP Safety Requirements into Kenya's Grid Codes

    Energy Technology Data Exchange (ETDEWEB)

    Ndirangu, Nguni James; Koo, Chang Choong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    As presently drafted, Kenya's grid codes do not contain any NPP requirements. Through case studies of selected grid codes, this paper will study frequency, voltage and fault ride through requirements for NPP connection and operation, and offer recommendation of how these requirements can be incorporated in the Kenya's grid codes. Voltage and frequency excursions in Kenya's grid are notably frequently outside the generic requirement and the values observed by the German and UK grid codes. Kenya's grid codes require continuous operation for ±10% of nominal voltage and 45.0 to 52Hz on the grid which poses safety issues for an NPP. Considering stringent NPP connection to grid and operational safety requirements, and the importance of the TSO to NPP safety, more elaborate requirements need to be documented in the Kenya's grid codes. UK and Germany have a history of meeting high standards of nuclear safety and it is therefore recommended that format like the one in Table 1 to 3 should be adopted. Kenya's Grid code considering NPP should have: • Strict rules for voltage variation, that is, -5% to +10% of the nominal voltage • Strict rules for frequency variation, that is, 48Hz to 52Hz of the nominal frequencyand.

  10. Development of NPP Safety Requirements into Kenya's Grid Codes

    International Nuclear Information System (INIS)

    Ndirangu, Nguni James; Koo, Chang Choong

    2015-01-01

    As presently drafted, Kenya's grid codes do not contain any NPP requirements. Through case studies of selected grid codes, this paper will study frequency, voltage and fault ride through requirements for NPP connection and operation, and offer recommendation of how these requirements can be incorporated in the Kenya's grid codes. Voltage and frequency excursions in Kenya's grid are notably frequently outside the generic requirement and the values observed by the German and UK grid codes. Kenya's grid codes require continuous operation for ±10% of nominal voltage and 45.0 to 52Hz on the grid which poses safety issues for an NPP. Considering stringent NPP connection to grid and operational safety requirements, and the importance of the TSO to NPP safety, more elaborate requirements need to be documented in the Kenya's grid codes. UK and Germany have a history of meeting high standards of nuclear safety and it is therefore recommended that format like the one in Table 1 to 3 should be adopted. Kenya's Grid code considering NPP should have: • Strict rules for voltage variation, that is, -5% to +10% of the nominal voltage • Strict rules for frequency variation, that is, 48Hz to 52Hz of the nominal frequencyand

  11. Activities of nuclear training centre in Ljubljana for nuclear community in Slovenia and internationally

    International Nuclear Information System (INIS)

    Stritar, Andrej

    1998-01-01

    It is the vision of the Nuclear Training Centre to be a respected source of knowledge about nuclear technologies in the country and internationally. Our main mission is training of NPP Krsko personnel. For that purpose the training centre was established ten years ago. In addition we are spreading our activities also to other users. We are organizing international training courses, mainly under the sponsorship of the International Atomic Energy Agency. We are also authorized to train professionals, dealing with ionizing radiation in medicine, industry and science. Growing importance is given to our public information activity in our information centre. (author)

  12. Public opinion about nuclear energy. Year 2007 poll

    International Nuclear Information System (INIS)

    Istenic, R.; Jencic, I.

    2007-01-01

    Nuclear Training Centre Milan Copic (Izobrazevalni center za jedrsko tehnologijo - ICJT) at Jozef Stefan Institute in Ljubljana incorporates the Information Centre for general public. Most of the visitors are youngsters and almost one half of every generation of schoolchildren in Slovenia is informed on nuclear energy by live lectures, exhibition, publications and laboratory demonstrations. About 1000 visitors are polled every year since 1993 to measure the opinion about nuclear power and get a feed-back for our activities. Continued operation of NPP Krsko is supported by 69% of youngsters (negative trend from the last year's 76%), while opposition remains low. (author)

  13. Development and utilization of bitumen immobilizing process for radioactive waste materials; Razvoj i primena procesa imobilizacije radioaktivnog otpadnog materijala bitumenskim postupkom

    Energy Technology Data Exchange (ETDEWEB)

    Peric, A; Plecas, I; Kostadinovic, A [Institut za Nuklearne Nauke Boris Kidric, Belgrade (Yugoslavia)

    1988-07-01

    Bitumenization is one of the relevant methods for solidification of radioactive waste materials in nuclear technology, today. Bitumenization of R.A. wastes can be obtained either with batch or continual process. In 'IBK', mixer-evaporator vessel for batch process, with continual feeder of process influents, was developed. From the several R.A. materials, that can be solidified into bitumen, ion-exchanged resins, used in NPP Krsko, were chosen and treated, at the various ranges of pH and T. Researches and experiments pointed and verified on use of Yugoslav produced bitumens, as a matrix media for immobilizing the solid R.A. (author)

  14. Upgrading NPP personnel. Competence and training through the systematic approach to training

    International Nuclear Information System (INIS)

    Mautner Markhof, F.

    1998-01-01

    This paper presents the reasons for acceptance of SAT (Systematic Approach to Training) as the best international practice in respect to training of NPP personnel and the differences in comparison to traditional approaches to training. The identification and evaluation of the new training needs, resources and other requirements for implementing SAT are discussed as well as new approaches and existing training capabilities and involvement of Regulatory body in training of NPP personnel. The IAEA Guidebook on NPP Personnel Training (TRS-380) was used a a basis for discussion of the mentioned topics with the emphasis on achieving the best possible training programmes for NPP personnel

  15. Validation of S-NPP VIIRS Sea Surface Temperature Retrieved from NAVO

    Directory of Open Access Journals (Sweden)

    Qianguang Tu

    2015-12-01

    Full Text Available The validation of sea surface temperature (SST retrieved from the new sensor Visible Infrared Imaging Radiometer Suite (VIIRS onboard the Suomi National Polar-Orbiting Partnership (S-NPP Satellite is essential for the interpretation, use, and improvement of the new generation SST product. In this study, the magnitude and characteristics of uncertainties in S-NPP VIIRS SST produced by the Naval Oceanographic Office (NAVO are investigated. The NAVO S-NPP VIIRS SST and eight types of quality-controlled in situ SST from the National Oceanic and Atmospheric Administration in situ Quality Monitor (iQuam are condensed into a Taylor diagram. Considering these comparisons and their spatial coverage, the NAVO S-NPP VIIRS SST is then validated using collocated drifters measured SST via a three-way error analysis which also includes SST derived from Moderate Resolution Imaging Spectro-radiometer (MODIS onboard AQUA. The analysis shows that the NAVO S-NPP VIIRS SST is of high accuracy, which lies between the drifters measured SST and AQUA MODIS SST. The histogram of NAVO S-NPP VIIRS SST root-mean-square error (RMSE shows normality in the range of 0–0.6 °C with a median of ~0.31 °C. Global distribution of NAVO VIIRS SST shows pronounced warm biases up to 0.5 °C in the Southern Hemisphere at high latitudes with respect to the drifters measured SST, while near-zero biases are observed in AQUA MODIS. It means that these biases may be caused by the NAVO S-NPP VIIRS SST retrieval algorithm rather than the nature of the SST. The reasons and correction for this bias need to be further studied.

  16. Public acceptance of nuclear energy in Indonesia. A traditional puppet show for NPP in Java

    International Nuclear Information System (INIS)

    Suyudi Soeliarno

    1995-01-01

    In Indonesia, activities on public relation have been carried out since the establishment of the agency responsible for research and development of atomic energy in 1958 (which later in the year 1964 became Batan, National Atomic Energy Agency), wile activities on public acceptance started 'at the end of 1985. After the Government indicated that it has to look seriously into the construction of the NPP, as from 1990, the public acceptance (PA) activities have been intensified in anticipation of the construction of the first NPP. An important part of the preparatory activities for the construction of the NPP is preparing the people, particularly those who live near the NPP site, to accept and to support the NPP program. The interdepartmental team has bee established in August 1990 consisting of representatives of several institutions, namely, Ministry of Information, Ministry of Domestic Affairs, Ministry of Defense, Land Utilization Agency, State Electricity Corporation, Office of the Minister for Population and Environment, and Batan. This team, called the 'Team on Public Acceptance of NPP', has the main task providing extensive information to the public concerning the government plan to construct nuclear power plants in Indonesia. From 1990 through the middle of 1994 the activity of the Team on Public Acceptance of NPP was focused on providing information on te NPP program to the local community leaders and the public, particularly in the districts of the NPP site in the Muria Peninsula region. Its main purpose was to precondition the people who live near the NPP site to accept the NPP in their neighbourhood without fear

  17. Component Cooling Heat Exchanger Heat Transfer Capability Operability Monitoring

    International Nuclear Information System (INIS)

    Mihalina, M.; Djetelic, N.

    2010-01-01

    The ultimate heat sink (UHS) is of highest importance for nuclear power plant safe and reliable operation. The most important component in line from safety-related heat sources to the ultimate heat sink water body is a component cooling heat exchanger (CC Heat Exchanger). The Component Cooling Heat Exchanger has a safety-related function to transfer the heat from the Component Cooling (CC) water system to the Service Water (SW) system. SW systems throughout the world have been the root of many plant problems because the water source, usually river, lake, sea or cooling pond, are conductive to corrosion, erosion, biofouling, debris intrusion, silt, sediment deposits, etc. At Krsko NPP, these problems usually cumulate in the summer period from July to August, with higher Sava River (service water system) temperatures. Therefore it was necessary to continuously evaluate the CC Heat Exchanger operation and confirm that the system would perform its intended function in accordance with the plant's design basis, given as a minimum heat transfer rate in the heat exchanger design specification sheet. The Essential Service Water system at Krsko NPP is an open cycle cooling system which transfers heat from safety and non-safety-related systems and components to the ultimate heat sink the Sava River. The system is continuously in operation in all modes of plant operation, including plant shutdown and refueling. However, due to the Sava River impurities and our limited abilities of the water treatment, the system is subject to fouling, sedimentation buildup, corrosion and scale formation, which could negatively impact its performance being unable to satisfy its safety related post accident heat removal function. Low temperature difference and high fluid flows make it difficult to evaluate the CC Heat Exchanger due to its specific design. The important effects noted are measurement uncertainties, nonspecific construction, high heat transfer capacity, and operational specifics (e

  18. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North American and...

  19. Use of NESTLE computer code for NPP transition process analysis

    International Nuclear Information System (INIS)

    Gal'chenko, V.V.

    2001-01-01

    A newly created WWER-440 reactor model with use NESTLE code is discussed. Results of 'fast' and 'slow' transition processes based on it are presented. This model was developed for Rovno NPP reactor and it can be used also for WWER-1000 reactor in Zaporozhe NPP

  20. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  1. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  2. Motor-operated Valve Program at NPP Krsko (NEK) - Status and Overview

    International Nuclear Information System (INIS)

    Nikolic, M; Jagodar, N.; Cerjak, J.; Butkovic, V.

    2002-01-01

    On the basics of US NRC Generic Letter 89-10 Safety-related Motor-operated Valve Testing and Surveillance and subsequent generic letters, Motor-operated Valve (MOV) Program at NEK has been developing. Namely, the holders of nuclear power plant operating licenses has to verify the design basis capability of safety-related e.g. important-to-safety MOVs, as well as to ensure the same for the life of the plant. In light of that, each plant should establish a program to address stressed issues for each program MOV (124 at NEK). Such comprehensive task requires significant effort in many aspects, and basically multidisciplinary skills. NEK MOV Program represents a blend of engineering and in-plant testing, comprised of three phases: Phase I Engineering, Phase II Field Implementation and Phase III Trending. Currently, the program is about the end of Phase I and II, as well as in development of engineering basis for launching Phase III. Overview of the major programmatic issues will be given in this paper along with ongoing activities: testing process, gear-ratio modification, pressure locking/thermal binding susceptibility screening and preventive maintenance. (author)

  3. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  4. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  5. ASSET experience at Paks NPP

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, I [Operational Safety Dept., Paks NPP, Paks (Hungary)

    1997-10-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones.

  6. A Radiological Survey Approach to Use Prior to Decommissioning: Results from a Technology Scanning and Assessment Project Focused on the Chornobyl NPP

    Energy Technology Data Exchange (ETDEWEB)

    Milchikov, A.; Hund, G.; Davidko, M.

    1999-10-20

    The primary objectives of this project are to learn how to plan and execute the Technology Scanning and Assessment (TSA) approach by conducting a project and to be able to provide the approach as a capability to the Chernobyl Nuclear Power Plant (ChNPP) and potentially elsewhere. A secondary objective is to learn specifics about decommissioning and in particular about radiological surveying to be performed prior to decommissioning to help ChNPP decision makers. TSA is a multi-faceted capability that monitors and analyzes scientific, technical, regulatory, and business factors and trends for decision makers and company leaders. It is a management tool where information is systematically gathered, analyzed, and used in business planning and decision making. It helps managers by organizing the flow of critical information and provides managers with information they can act upon. The focus of this TSA project is on radiological surveying with the target being ChNPP's Unit 1. This reactor was stopped on November 30, 1996. At this time, Ukraine failed to have a regulatory basis to provide guidelines for nuclear site decommissioning. This situation has not changed as of today. A number of documents have been prepared to become a basis for a combined study of the ChNPP Unit 1 from the engineering and radiological perspectives. The results of such a study are expected to be used when a detailed decommissioning plan is created.

  7. A Radiological Survey Approach to Use Prior to Decommissioning: Results from a Technology Scanning and Assessment Project Focused on the Chernobyl NPP

    International Nuclear Information System (INIS)

    Milchikov, A.; Hund, G.; Davidko, M.

    1999-01-01

    The primary objectives of this project are to learn how to plan and execute the Technology Scanning and Assessment (TSA) approach by conducting a project and to be able to provide the approach as a capability to the Chernobyl Nuclear Power Plant (ChNPP) and potentially elsewhere. A secondary objective is to learn specifics about decommissioning and in particular about radiological surveying to be performed prior to decommissioning to help ChNPP decision makers. TSA is a multi-faceted capability that monitors and analyzes scientific, technical, regulatory, and business factors and trends for decision makers and company leaders. It is a management tool where information is systematically gathered, analyzed, and used in business planning and decision making. It helps managers by organizing the flow of critical information and provides managers with information they can act upon. The focus of this TSA project is on radiological surveying with the target being ChNPP's Unit 1. This reactor was stopped on November 30, 1996. At this time, Ukraine failed to have a regulatory basis to provide guidelines for nuclear site decommissioning. This situation has not changed as of today. A number of documents have been prepared to become a basis for a combined study of the ChNPP Unit 1 from the engineering and radiological perspectives. The results of such a study are expected to be used when a detailed decommissioning plan is created

  8. Analysis of an NPP Structure subjected to Vibrations Induced from Airplane Crashes

    International Nuclear Information System (INIS)

    Noh, Sang Hoon; Kim, Yong Soo; Kim, Chong Hak

    2009-01-01

    After the terrorists' attacks with civilian airplanes on September 11, 2001, special attention has been paid to the potential for an airplane crash into a Nuclear Power Plant (NPP) as a man-made hazard. An airplane crash (APC) into an NPP has the potential to damage the roofs and walls of these structures, as well as other systems and components such as pipelines, electric motors, power supplies, power cables of electricity transmission that are important for safety. Therefore, an evaluation of the structural response to an APC is important for the safety of NPPs to be confirmed. A structural integrity analysis was carried out focusing on the vibration effects of an APC on an NPP structure. The NPP structure under consideration has been conceptually redesigned based on APR1400 to have double containments for the purpose of a feasibility study to meet European requirements. The finite element method was used for the structural analysis of the NPP, and the computer code ABAQUS was employed for this analysis

  9. Ecological radiation monotoring in NPP region, aims and tasks

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1986-01-01

    Aims and tasks of ecological radiation monitoring in the NPP region are discussed. The aims of monitoring are: to determine possible sequences of NPP radioactive release effects on ecosystems, taking place on the background of chemical and thermal pollution to develop standard of radiation effect on ecosystems; the aims includes also obtaining of information for forecasting and evaluating long-term radiation effects, establishment of factors characterizing the ecosystem state, establishment of a combined effect of radioactive wastes with chemical and thermal ones. Finally, the aim of monitoring consists in providing the natural object conservation in the NPP region under optimal operation conditions. Thus it is necessary to solve the following problems: to observe systematically release, transport and transformation, when transporting radioactive and chemical contaminants in terrestial and aquatic biocenoses, as well as injection and transport in them of waste heat; to observe systematically the natural physico-chemical, chemico-biological processes affecting the injection and transport of contaminants in ecosystem components; to observe systematically the natural and, probably, antropogenic processes; to carry out systematically observations of the ecosystem state in the NPP region and eco-systems-monitors

  10. Safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    1995-01-01

    Preparation of safety practices on assessment and management of aging of major NPP components important to safety, CRP on management of aging of concrete containment buildings, CRP on management of aging of in-containment instrumentation and control cables are outlined

  11. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  12. Conceptual Design of a Combined Power Generation Unit at the NPP Seaside

    International Nuclear Information System (INIS)

    Cha, Kyung H.

    2011-01-01

    In order to improve operational performance, an undersea tunnel is being utilized for in-taking and out-taking seawater as coolant in Nuclear Power Plant (NPP). This paper describes a Combined solar-wind-wave Power Generation Unit (CPGU) to be specialized for in-taking and out-taking seawater as coolant in NPP. Accordingly, the purpose of the CPGU is twofold: one is to contain some tunnels to be maintained on the bottom of the CPGU body in order to in-take and out-take coolant water, and the other is to generate a combined power at the NPP seaside. Fig. 1 shows the conceptual CPGU to be configured at the NPP seaside

  13. Top level risk study for units 1 to 4 at NPP Kozloduy

    International Nuclear Information System (INIS)

    Shishkova, I.

    1997-01-01

    The first Top Level Study of NPP Kozloduy Units 1/4 was started in 1991 and completed in March 1992 by BEQE. The Primary objective of the project was to provide in a short term a tool for quantified comparison of the relative risk benefits that various design or operational modifications would have if implemented on NPP Kozloduy Units 1/4. This original version of the Study was reviewed by the IAEA who agreed in general with the conclusions indicating that the report provides valuable insights which should be used in the decision making process. The IAEA made suggestion for some changes. These comments were taken into account in the subsequent version. In early 1994 the new version was issued. The objective of this second project, in addition to revising the original study to reflect the IAEA comments, was to address the potential benefits from further improvements at NPP Kozloduy. The work on the second version was going on in parallel with the activities carried out in the mainframe of several NPP Kozloduy Units 1/4 Upgrading Program (WANO Six-Month Program, Program for the NPP Kozloduy Units 1-4 Upgrading, Twinning Program, etc.). And at last, a Top-Level Probabilistic Safety Study was carried out by EQE - Bulgaria and completed early in 1995 at the request of NPP Kozloduy. The objective of the project was the contribution of the different activities performed in the mainframe of the Program for the NPP Kozloduy Units 1-4 Safety Upgrading in the overall safety improvement to be assessed. 3 figs, 1 tab

  14. NPP operation and modern high technologies

    International Nuclear Information System (INIS)

    Kuznetsov, V.V.

    1992-01-01

    Examples are considered of modern high technology introduction into daily practice of NPP operation, namely: satellite communication systems, robots, non-destructive testing, optical-fiber techniques, laser measuring means and others

  15. Design of NPP of new generation being constructed at the Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitsky, V.

    1999-01-01

    The design of a new generation NPP is described, underscoring advances in physical attributes and passive safety systems based on experiences with earlier designs at operating NPPs. This paper elaborates on systems for handling and storing radioactive wastes, on refinements in containment measures and on experimental and analytic validation of critical design factors. (author)

  16. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  17. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  18. Core design methodology and software for Temelin NPP

    International Nuclear Information System (INIS)

    Havluj, F; Hejzlar, J.; Klouzal, J.; Stary, V.; Vocka, R.

    2011-01-01

    In the frame of the process of fuel vendor change at Temelin NPP in the Czech Republic, where, starting since 2010, TVEL TVSA-T fuel is loaded instead of Westinghouse VVANTAGE-6 fuel, new methodologies for core design and core reload safety evaluation have been developed. These documents are based on the methodologies delivered by TVEL within the fuel contract, and they were further adapted according to Temelin NPP operational needs and according to the current practice at NPP. Along with the methodology development the 3D core analysis code ANDREA, licensed for core reload safety evaluation in 2010, have been upgraded in order to optimize the safety evaluation process. New sequences of calculations were implemented in order to simplify the evaluation of different limiting parameters and output visualization tools were developed to make the verification process user friendly. Interfaces to the fuel performance code TRANSURANUS and sub-channel analysis code SUBCAL were developed as well. (authors)

  19. Main principles of the Chernobyl' NPP zone development

    International Nuclear Information System (INIS)

    Ignatenko, E.I.; Komarov, V.I.; Zverkov, V.V.; Proskuryakov, A.G.

    1989-01-01

    It is suggested to divide the Chernobyl' NPP zone into two parts, which are the alienation and evacuation (buffer) zones. The alienation zone includes the areas with greatest contamination around the Chernobyl' NPP. The population residence in this zone is forbidden. The watching method of working with short-time personnel residence is suggested to be used in this zone. The buffer zone is the territory out of the alienation zone boundaries including all settlements, from which the population is evacuated. Constant residence is permitted in the buffer zone for persons 50 and more years old with introduction of restrictions for diet and residence organization. The production activity in this zone includes operation of three units of the Chernobyl' NPP, works with the Ukrytie object and researches. Operations connected with radioactive waste processing and redisposal from places of storage is not recommended to be done. It is suggested to develop methods for local radioactive waste processing

  20. NPP Temelin. Status of safety improvements

    International Nuclear Information System (INIS)

    1999-01-01

    The WWER-1000 Temelin NPP under construction has been subjected as other NPPs of the same type to numerous project reviews resulting in quite a number of recommendations for design changes. Results of the IAEA mission to review the resolution of WWER-1000 safety issues at Temelin NPP are cited in this paper. The main conclusions emphasize that a combination of eastern and western technology and practices led to safety improvements in comparison with the international practices. Plant managers are clearly committed to implementation of operational programs which are consistent with effective western operational safety practices. Considerable effort remains to bring planned programs to successful implementation, in particular in meeting the need to foster strong safety culture among all personnel

  1. A comparison of the Kozloduy NPP and Temelin NPP I and C projects

    International Nuclear Information System (INIS)

    Cook, B.M.

    2004-01-01

    Because Kozloduy NPP and Temelin NPP are both VVER 1000 plants of roughly the same vintage, they are very similar in design. However, from the viewpoint of their I and C modernization projects, there are significant differences between these plants. Some of these differences stem from the evolution of I and C technology over the relatively short period between the two projects. Other differences arise from the fact that the Kozloduy project is a phased upgrade of the I and C systems in an operating plant while the Temelin project was a 'one time' installation of the entire plant I and C system. This paper discusses these differences as well as trends in the nuclear I and C field that will shape the industry in the future. In addition to technology evolution, the comparative advantages or problems in phased upgrade versus 'one time' installations are discussed. Conclusions drawn provide insight for the planning of future I and C upgrades in VVERs and other types of nuclear power plants. (author)

  2. The safety of Ignalina NPP and ecological danger in public opinion of inhabitants of Daugavpils region

    International Nuclear Information System (INIS)

    Peipinia, O.

    1998-01-01

    Inquest of Daugavpils' region pointed to a big anxiety for ecological danger of Ignalina NPP by inhabitants and experts. Absolute majority of respondents (73-78% inhabitants and 68-82% experts) apprehend the NPP as very dangerous and dangerous. More than half of respondents apprehend the dangerous increased during last two-three years. It is because no one has a good reference about situation, because tragic al Chernobyl NPP burst was on. The anxiety increases if the respondent lives nearer of NPP. Inhabitants of Daugavpils and it's region wants the better reference about situation, about future of Ignalina NPP after 2010 year, about securities means in case of NPP burst. (author)

  3. Conversion of control systems, protection and engineering safeguard system signals of Almaraz NPP model from RELAP5 into TRAC-M

    International Nuclear Information System (INIS)

    Mulas, J.; Queral, C.; Collazo, I.; Concejal, A.; Burbano, N.; Lopez Lechas, A.; Tarrega, I.

    2002-01-01

    In the scope of a joint project between the Spanish Regulatory Commission (CSN) and the electric energy industry of Spain (UNESA) about the USNRC state-of-art thermal hydraulic code, TRAC-M, there is a task relating to the translation of the Spanish NPP models from other TH codes to the new one. As a part of this project, our team is working on the translation of Almaraz NPP model from RELAP5/MOD3.2 to TRAC-M. One of the goals of the project is to analyze the conversion of control blocks, signal variables and trips in order to correct modelling all instrumentation and control systems, and also protection and engineering safeguard system-signals of the NPP. At present, several portions of the input deck have been converted to TRAC-M, and the output data have also been compared with RELAP5 data. This paper describes the problems found in the conversion and the solutions achieved.(author)

  4. Performance indicator system with application to NPP management

    International Nuclear Information System (INIS)

    Gomez, J.; Roldan, J.

    2001-01-01

    The objective of the paper is to present the work that is being conducted in the scope of a research project between Cofrentes NPP and the polytechnic university of Valencia aimed to the development and implementation of a performance indicators system to support plant management. In developing this system, attention is being paid to the areas of safety, production and dependability. The first step in the project was the development of the performance indicator system (PIS), in order to help in assessing the effectiveness of the different activities in plant (i.e. maintenance, inspections, tests, etc.). It is suggested establishing the operational indicators set in 3 levels. The lowest level concerns indicators monitoring performance and maintenance characteristics of components. The next one involves a subset of indicators placed at system level with a similar goal. And finally, the highest level summarizes the impact of the global policy in the whole plant from safety and performance point of view. The definition of an indicator should comprise, at least, the following items: indicator's name, performance area, definition and data needed. A strategy should define what, when and how indicators have to be evaluated, analyzed and reported. This article gives an example application of the methodology at the Cofrentes NPP, collective dose as safety indicator, power production as production indicator and the number of work orders as maintenance indicator are considered and their time evolution is given. (A.C.)

  5. The Investigation of NPP Control and Monitoring Functional Analysis Applied to Functional Displays’ Implementation

    International Nuclear Information System (INIS)

    Yan, J.

    2015-01-01

    NPP Control and Monitoring System has been recognised as extreme and safe as well as large scale product, thus it was one of the most major design activities that fully, accurately and operationally functional analysis. The results of functional analysis would be employed as initial instruction through the whole lifecycle of NPP Control and Monitoring System. In this paper, it was discovered that several disadvantages of present functional analysis methods included FAST, The Subtract and Operate Procedure and Functional Procedure Method; owing to the identity methods enveloped here was the combination of Functional Tree and System Structure, as well as its decomposition steps; and RCS Inventory Control function which is defined as one of the most significant control functions in Advanced Light Water Reactor Utility Requirement Document has been employed to demonstrate the feasibility of this method; the analysis results of RCS Inventory function has been applied to direct the design and implementation of related displays, here the functional display of RCS Inventory Control function has been implemented on NuCON which is originated by SNPAS. Owing to the analyzing results, it would be ensured that the accuracy of information displayed to operators, thus the operator would be aware the condition of systems and then make the proper move to ensure the safety and productivity of NPP based on the received data. (author)

  6. Safety improvement and results of commissioning of Mochovce NPP WWER 440/213

    International Nuclear Information System (INIS)

    Lipar, M.

    1998-01-01

    Mochovce NPP is the last one of this kind and compared to its predecessors, it is characterized by several modifications which contribute to the improvement of the safety level. In addition based on Nuclear Regulatory Authority requirements and based on documents: - IAEA - Safety Issues and their ranking for NPP WWER 440/213, - IAEA - Safety Improvement of Mochovce NPP Project Review Mission, - Riskaudit - Evaluation of the Mochovce NPP Safety Improvements. Additional safety measures have been implemented before commissioning. The consortium EUCOM (FRAMATOME - SIEMENS), SKODA Praha, ENERGOPROJEKT Praha, Russian organizations and VUJE Trnava Nuclear Power Plants research institute were selected for design and implementation of the safety measures. The papers summarized, safety requirements, safety measures implemented, results of commissioning and results of safety analysis report evaluation. (author)

  7. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  8. Ways of solving the problem of NPP evaporate concentrate storage

    International Nuclear Information System (INIS)

    Dmitriev, S.A.; Lifanov, F.A.; Savkin, A.E.; Lashchenov, S.M.

    2000-01-01

    The use of next engineering operations: isotope separation using oxidation, filtration and selective sorption methods, hardening and long term secondary radioactive waste disposal (cement compound from filtration stage and depleted sorbent on filters); concentration and preparation of dry salts from the radionuclide-free stillage residues were proposed for NPP waste reprocessing. The laboratory and pilot tests that demonstrated the possibility for purification of NPP stillage residues from radionuclides to the levels less than maximum permissible ones were conducted. The purified stillage residues are sent for the burial after drying. The calculations of material flows are treated by the example of the Kursk NPP stillage residue and the scheme of the waste retrieval is given [ru

  9. Safety of NPP with WWER-440 and WWER-1000 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Balabanov, E [Energoproekt, Sofia (Bulgaria); Gledachev, J; Angelov, D [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    The WWER-440 and WWER-1000 reactors used at the Kozloduy NPP have been analyzed in terms of safety. There are currently 4 reactors WWER-440/230 and 2 reactors WWER-1000/320. The former do not comply completely with the modern safety requirements due to the regulations acted in the sixties when they have been designed. The main features of these reactors are: low power density in the core; three levels of reactor control and protection; six primary loops; horizontal steam generators; two turbines; large number of cross-unit connections. The low thermal density in the core, the low specific thermal loading in the rods and the large coolant inventory enhance the safety, while the major deficiencies are identified as follows: insufficient capabilities for emergency core cooling; low diversification and physical separation of the safety systems; old fashioned control systems; inadequate fire protection; lack of full containment. It is pointed out that several design and operation actions have been completed in the Kozloduy NPP in order to enhance their safety. The WWER-1000 units are 320 model and feature a high safety level, complying completely with OPB-82 regulations and with all current international safety standards. 3 refs., 7 figs., 1 tab.

  10. Bouguer density analysis using nettleton method at Banten NPP site

    International Nuclear Information System (INIS)

    Yuliastuti; Hadi Suntoko; Yarianto SBS

    2017-01-01

    Sub-surface information become crucial in determining a feasible NPP site that safe from external hazards. Gravity survey which result as density information, is essential to understand the sub-surface structure. Nevertheless, overcorrected or under corrected will lead to a false interpretation. Therefore, density correction in term of near-surface average density or Bouguer density is necessary to be calculated. The objective of this paper is to estimate and analyze Bouguer density using Nettleton method at Banten NPP Site. Methodology used in this paper is Nettleton method that applied in three different slices (A-B, A-C and A-D) with density assumption range between 1700 and 3300 kg/m"3. Nettleton method is based on minimum correlation between gravity anomaly and topography to determine density correction. The result shows that slice A-B which covers rough topography difference, Nettleton method failed. While using the other two slices, Nettleton method yield with a different density value, 2700 kg/m"3 for A-C and 2300 kg/m"3 for A-D. A-C provides the lowest correlation value which represents the Upper Banten tuff and Gede Mt. volcanic rocks in accordance with Quartenary rocks exist in the studied area. (author)

  11. Safety of NPP with WWER-440 and WWER-1000 reactors

    International Nuclear Information System (INIS)

    Balabanov, E.; Gledachev, J.; Angelov, D.

    1995-01-01

    The WWER-440 and WWER-1000 reactors used at the Kozloduy NPP have been analyzed in terms of safety. There are currently 4 reactors WWER-440/230 and 2 reactors WWER-1000/320. The former do not comply completely with the modern safety requirements due to the regulations acted in the sixties when they have been designed. The main features of these reactors are: low power density in the core; three levels of reactor control and protection; six primary loops; horizontal steam generators; two turbines; large number of cross-unit connections. The low thermal density in the core, the low specific thermal loading in the rods and the large coolant inventory enhance the safety, while the major deficiencies are identified as follows: insufficient capabilities for emergency core cooling; low diversification and physical separation of the safety systems; old fashioned control systems; inadequate fire protection; lack of full containment. It is pointed out that several design and operation actions have been completed in the Kozloduy NPP in order to enhance their safety. The WWER-1000 units are 320 model and feature a high safety level, complying completely with OPB-82 regulations and with all current international safety standards. 3 refs., 7 figs., 1 tab

  12. Variations and trends of terrestrial NPP and its relation to climate

    Indian Academy of Sciences (India)

    Considering global climate change, near surface temperature is the major factor affecting the terrestrial ecosystem, followed by the precipitation. This means terrestrial ecosystem NPP is more closely related to near surface temperature than precipitation. Between 1976 and 2005, NPP shows an obvious increasing temporal ...

  13. New Emergency control center of Slovenske Elektrarne Bohunice NPP

    International Nuclear Information System (INIS)

    Pecko, E.

    2012-01-01

    Emergency preparedness of nuclear power plant and operation assurance in case of a possible emergency calls to have devices for emergency response with equipment for rapid detection and continuous evaluation of anticipated events. Chief executive body designated to manage a nuclear power plant during major events is the emergency committee (EC). Emergency Committee is a part of the Emergency Response Organization (ERO). The following centers are on alert to ensure the activities of the ERO - Emergency Response office: - control room (CR) and emergency control room (ECR); - emergency management center (EMC); - Monitoring Centre (MC); - emergency backup control center (EBCC); - congregations of civil protection (CP) and CP shelters; - communications with warning and notification system (VARVYR). From a historical and practical point of view in the vicinity of Jaslovske Bohunice has been set up a joint emergency control center. The center was located on the territory of the former already inoperative V1 NPP. V1 NPP is currently integrated into the organizational structure of JAVYS. Operating Bohunice V2 NPP plant is a designated part of the Slovenske Elektrarne, a. s., whose majority owner is an Italian operator ENEL. In terms of various relevant factors, it was decided to build a new emergency management center on the territory of operating V2 NPP, meet the current standards.

  14. Improvement of waste release control in French NPP

    International Nuclear Information System (INIS)

    Samson, T.; Lucquin, E.; Dupin, M.; Florence, D.; Grisot, M.

    2002-01-01

    The new waste release control in French NPP is more restrictive than the old one and needs heavy investment to bring plants to compliance with it. The great evolutions are a chemical follow up on more chemicals with a higher measurement frequency and with lower maximum concentrations and a specific measurement of carbon 14. Regarding radioactive releases, a new counting has been settled and activity of carbon 14 release is now measured and no longer calculated. The evolution of the French regulation leads to develop specific procedures and analytical techniques in chemistry and in radiochemistry (UV spectrometric methods, carbon 14 measurements,..) EDF NPP operators have launched a voluntarist process to reduce their releases since the beginning and before the evolution of the regulation. EDF priorities in terms of environment care lead henceforth to implement a global optimisation of the impact for a better control of releases. The new regulation will help EDF to reach its goals because it covers all the aspects in one administrative document: it is seen as a real simplification and a clarification towards public. In addition, this new regulation fits in with international practices which will allow an easier comparison of results between EDF and foreign NPP. These big environmental concerns lead EDF to create a national dedicated laboratory (LAMEN) in charge of developing specific measurement procedures to be implemented either by NPP or by sub-contractor laboratories. (authors)

  15. Improvement of waste release control in French NPP

    Energy Technology Data Exchange (ETDEWEB)

    Samson, T.; Lucquin, E.; Dupin, M. [EDF/GDL (France); Florence, D. [EDF/GENV (France); Grisot, M. [EDF/CNPE Saint Laurent (France)

    2002-07-01

    The new waste release control in French NPP is more restrictive than the old one and needs heavy investment to bring plants to compliance with it. The great evolutions are a chemical follow up on more chemicals with a higher measurement frequency and with lower maximum concentrations and a specific measurement of carbon 14. Regarding radioactive releases, a new counting has been settled and activity of carbon 14 release is now measured and no longer calculated. The evolution of the French regulation leads to develop specific procedures and analytical techniques in chemistry and in radiochemistry (UV spectrometric methods, carbon 14 measurements,..) EDF NPP operators have launched a voluntarist process to reduce their releases since the beginning and before the evolution of the regulation. EDF priorities in terms of environment care lead henceforth to implement a global optimisation of the impact for a better control of releases. The new regulation will help EDF to reach its goals because it covers all the aspects in one administrative document: it is seen as a real simplification and a clarification towards public. In addition, this new regulation fits in with international practices which will allow an easier comparison of results between EDF and foreign NPP. These big environmental concerns lead EDF to create a national dedicated laboratory (LAMEN) in charge of developing specific measurement procedures to be implemented either by NPP or by sub-contractor laboratories. (authors)

  16. Standard protocol for evaluation of environmental transfer factors around NPP sites

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rao, D.D.

    2009-01-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for evaluation of environmental transfer factors around NPP sites. The studies on transfer factors are being carried out at various NPP sites under DAE-BRNS projects for evaluation of site specific transfer factors for radionuclides released from power plants. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  17. Core Knowledge Preservation and Transfer System Establishment and Utilization for NPP

    International Nuclear Information System (INIS)

    Kim, Bae-Joo; Kim, Gwang-Bong

    2008-01-01

    Knowledge is the most important factor in the safe and reliable operation of NPP. One generation has passed since we began to operate NPP in Korea. And then it became time to retire much experienced personnel in NPP. Although we have many kinds of knowledge sharing systems inside KHNP, we don't have any systematic experience knowledge preservation and transfer systems that are important for the operation of NPP. So we have lost important experience knowledge since we started operating. Especially, KHNP has adopted an internal promotion system as the human resource management policy, which induced frequent job position changes of staff members because there were job positions for a good promotion. Additionally, KHNP doesn't overlap jobs for long enough periods between previous staff and new staff when staff changes occur. With these reasons KHNP could not accumulate experience knowledge inside the company system. Therefore, KHNP could not preserve and transfer to the next generation the experience related to NPP operations systematically. To resolve these issues KNPEI performed a research project from March 2006 to September 2007. The purpose of this report is to introduce the experience knowledge preservation and transfer system that KNPEI has established and the utilization of the system

  18. Feature extraction and sensor selection for NPP initiating event identification

    International Nuclear Information System (INIS)

    Lin, Ting-Han; Wu, Shun-Chi; Chen, Kuang-You; Chou, Hwai-Pwu

    2017-01-01

    Highlights: • A two-stage feature extraction scheme for NPP initiating event identification. • With stBP, interrelations among the sensors can be retained for identification. • With dSFS, sensors that are crucial for identification can be efficiently selected. • Efficacy of the scheme is illustrated with data from the Maanshan NPP simulator. - Abstract: Initiating event identification is essential in managing nuclear power plant (NPP) severe accidents. In this paper, a novel two-stage feature extraction scheme that incorporates the proposed sensor type-wise block projection (stBP) and deflatable sequential forward selection (dSFS) is used to elicit the discriminant information in the data obtained from various NPP sensors to facilitate event identification. With the stBP, the primal features can be extracted without eliminating the interrelations among the sensors of the same type. The extracted features are then subjected to a further dimensionality reduction by selecting the sensors that are most relevant to the events under consideration. This selection is not easy, and a combinatorial optimization technique is normally required. With the dSFS, an optimal sensor set can be found with less computational load. Moreover, its sensor deflation stage allows sensors in the preselected set to be iteratively refined to avoid being trapped into a local optimum. Results from detailed experiments containing data of 12 event categories and a total of 112 events generated with a Taiwan’s Maanshan NPP simulator are presented to illustrate the efficacy of the proposed scheme.

  19. Tracking of Environment Changes by Exploitation of Suomi-NPP VIIRS Data

    Science.gov (United States)

    Ibrahim, W.; Greene, E.; van Poollen, C.; Cumpton, D.

    2017-12-01

    NOAA's next-generation environmental satellite system, Joint Polar Satellite System (JPSS), replaces the current Polar-orbiting Operational Environmental Satellites. JPSS satellites carry sensors which collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The first JPSS satellite, Suomi National Polar-orbiting Partnership (S-NPP), was launched in 2011. The JPSS ground system is the Common Ground System (CGS), and provides command, control, and communications (C3) and data processing (DP). S-NPP satellite includes the Visible Infrared Imaging Radiometer Suite (VIIRS), a 22-band scanning radiometer that provides top-of-atmosphere radiances and reflectances at a range of visible and infrared frequencies. Data collected from VIIRS are output by CGS DP into Raw Data Records (RDRs; Level-0), Sensor Data Records (SDRs; Level-1B) and Environmental Data Records (EDRs; Level-1C). This paper presents a methodology of monitoring and tracking impact of weather conditions on environment changes by exploitation of data from S-NPP VIIRS products. Three different products created from VIIRS data, SDR M-band True-Color (TC) composite visible imagery RGB (M5, M4 and M3), SDR M-band Natural-Color (NC) composite imagery RGB (M10, M7 and M5) and Vegetation Index (VI) EDR, are used to analyze the change in springtime vegetation and snowpack in California, USA, over four years from the height of the drought in 2014 to its end in 2017. While the TC composite images are more appealing to the human observer, utilization of the NC composite images allows for tracking and monitoring the changes in the snowpack in the Sierra Nevada, the reappearance of bodies of water and the changes in the vegetation composite. The VI product uses NDVI to characterize the vegetation temporally. By combining multiple VIIRS products, complex scenes can be visualized and analyzed temporally and spatially more accurately than just using a

  20. NPP capital equipment life control facilities and tools

    International Nuclear Information System (INIS)

    Nekrasov, A.V.; Proskuryakov, K.N.

    2009-01-01

    Algorithms and simulation package for calculation of eigen modes of coolant pressure oscillations in equipment of primary coolant circuit of WWER-1000 NPP, tuned-circuit Q-factor of an oscillating contour of the coolant, fluctuation frequencies pass band and attenuation factors of were developed. Calculation results for cases of presence and absence of gaseous state radiolysis products in the coolant were obtained. Results analysis makes it possible to disclose operating conditions which result in raised vibrations, and to develop control response in NPP industrial control system for their prevention [ru