WorldWideScience

Sample records for koritsuka kiso chosanado

  1. Kiso observations of 20 GRBs in the HETE-2 era

    International Nuclear Information System (INIS)

    Urata, Y.; Tamagawa, T.; Makishima, K.; Tokyo Univ., Tokyo

    2005-01-01

    We established a GRB follow-up observation system at the Kiso observatory (Japan) in 2001. Since prior to this the east Asian area has been a blank for a GRB follow-up observational network, this observational system is very important for studying the temporal and spectral evolution of early afterglows. We have thus been able to make quick observations of early phase optical afterglows based on HETE-2 and INTEGRAL alerts. Thanks to this quick follow-up observational system, we have so far been able to use the Kiso observatory to monitor 20 events, and conduct follow-up observations in the optical and near-infrared wavelengths

  2. Kiso observations of 20 GRBs in the HETE-2 era

    Energy Technology Data Exchange (ETDEWEB)

    Urata, Y. [RIKEN, Saitama (Japan); Tokyo Institute of Technology, Tokyo (Japan). Department of Physics; Nakada, Y.; Miyata, T.; Aoki, T.; Soyano, T.; Tarusawa, K.; Mito, H. [Kiso Observatory, Nagano (Japan); Tamagawa, T. [RIKEN, Saitama (Japan); Makishima, K. [RIKEN, Saitama (Japan); Tokyo Univ., Tokyo (Japan). Department of Physics

    2005-07-15

    We established a GRB follow-up observation system at the Kiso observatory (Japan) in 2001. Since prior to this the east Asian area has been a blank for a GRB follow-up observational network, this observational system is very important for studying the temporal and spectral evolution of early afterglows. We have thus been able to make quick observations of early phase optical afterglows based on HETE-2 and INTEGRAL alerts. Thanks to this quick follow-up observational system, we have so far been able to use the Kiso observatory to monitor 20 events, and conduct follow-up observations in the optical and near-infrared wavelengths.

  3. Basic research on energy conservation in developing countries. Joint research on oil conservation (research report on the industrial basis of Socialist Republic of Vietnam); Hatten tojokoku energy shohi koritsuka kiso chosanado jigyo sekiyu shohi koritsuka kyoryoku chosa. Betonamu shakai shugi kyowakoku sangyo kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The field research of oil conservation was conducted in developing countries, in particular, Vietnam where a steep increase in oil consumption is anticipated in the future. Energy conservation is the most effective direct measures to control combustion of fossil fuels, and an important issue to be promoted by all countries in the world to prevent global warming and reserve energy resources. In fiscal 1994, main industries in the northern part of Vietnam were researched. In fiscal 1995, the report meeting of plant survey results in the northern part and the technical seminar of energy-saving in industrial field were held, and plants around Ho Chi Minh City in the southern part of Vietnam were researched. Although Vietnam has recently acquired membership in ASEAN and is undergoing dramatic economic growth, has many problems in environmental measures. Japan has top-ranking results on energy-saving in industrial field, and the transfer of such superior technologies and techniques will greatly contribute to resource and global warming problems as well as pollution control measures in Vietnam. 13 refs., 25 figs., 26 tabs.

  4. KIGAM Seafloor Observation System (KISOS) for the baseline study in monitoring of gas hydrate test production in the Ulleung Basin, Korea

    Science.gov (United States)

    Lee, Sung-rock; Chun, Jong-hwa

    2013-04-01

    For the baseline study in the monitoring gas hydrate test production in the Ulleung Basin, Korea Institute of Geoscience and Mineral Resources (KIGAM) has developed the KIGAM Seafloor Observation System (KISOS) for seafloor exploration using unmanned remotely operated vehicle connected with a ship by a cable. The KISOS consists of a transponder of an acoustic positioning system (USBL), a bottom finding pinger, still camera, video camera, water sampler, and measuring devices (methane, oxygen, CTD, and turbidity sensors) mounted on the unmanned ROV, and a sediment collecting device collecting sediment on the seafloor. It is very important to monitoring the environmental risks (gas leakage and production water/drilling mud discharge) which may be occurred during the gas hydrate test production drilling. The KISOS will be applied to solely conduct baseline study with the KIGAM seafloor monitoring system (KIMOS) of the Korean gas hydrate program in the future. The large scale of environmental monitoring program includes the environmental impact assessment such as seafloor disturbance and subsidence, detection of methane gas leakage around well and cold seep, methane bubbles and dissolved methane, change of marine environments, chemical factor variation of water column and seabed, diffusion of drilling mud and production water, and biological factors of biodiversity and marine habitats before and after drilling test well and nearby areas. The design of the baseline survey will be determined based on the result of SIMAP simulation in 2013. The baseline survey will be performed to provide the gas leakage and production water/drilling mud discharge before and after gas hydrate test production. The field data of the baseline study will be evaluated by the simulation and verification of SIMAP simulator in 2014. In the presentation, the authors would like introduce the configuration of KISOS and applicability to the seafloor observation for the gas hydrate test production in

  5. On the building of Momoyama hydraulic power station on Kiso river. Kisogawa Momoyama suiryoku hatsudensho no kenchiku ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Kotera, T [Nagoya University, Nagoya (Japan). Faculty of Engineering

    1991-09-30

    This paper investigates Momoyama hydraulic power station built on the middle reaches of the Kiso River in Uematsu-cho, Kiso-gun, Nagano Prefecture in Japan, in 1923 by relating to the feature of the building of the hydraulic power station and the architect, Shiro Sato. The hydraulic power station originally was a functional and industrial building which puts a priority on the efficiency of business economy, at the same time it was often required to present a beautiful appearance. The building of Momoyama hydraulic power station was founded on the crane girder structure covered with reinforced concrete(RC) walls. A Hat roof of RC slab was applied to the roof of the building. It was generally designed in Neo-Gothic style. More specifically, however, the wall surface was designed in church style and the upper part was like a castle in the middle ages. Therefore the total design was eclectic. The outer surfaces of the building were remained to be bare concrete as cast. Such a multiple building symbolizes the situation of Japanes architecture in the 1920s. 4 figs.

  6. Spectral types for objects in the Kiso survey. IV - Data for 81 stars

    Science.gov (United States)

    Wegner, Gary; Mcmahan, Robert K.

    1988-01-01

    Spectroscopy and spectral types for 81 ultraviolet-excess objects found in the Kiso Schmidt-camera survey are reported. The data were secured with the McGraw-Hill 1.3 m telescope at 8-A resolution covering the wavelength interval 4000 -7200 A using the Mark II spectrograph. Descriptions of the spectra of some of the more peculiar objects found in this sample are given and include 14 sub-dwarfs, 23 definite DA white dwarfs, including a magnetic one, and one DQ whie dwarf, eight quasars and emission-line objects, and a new composite DA + dM system. More spectroscopy of the new cataclysmic variable KUV 01584-0939 and a possibly related object is also described.

  7. Basic research on energy conservation in developing countries. Basic research on promotion of activities implemented jointly (AIJ) (research on possibility of AIJ in developing countries); Hatten tojokoku energy shohi koritsuka kiso chosanado jigyo kyodo jisshi suishin kiso chosa. Hatten tojokoku ni okeru kyodo jisshi katsudo no kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The activities implemented jointly (AIJ) is expected as global measures to reduce greenhouse gas (such as CO2) emission. In this report, the possibility of AIJ projects in developing countries was researched. The United Nations Framework Convention on Climate Change was signed by 155 countries in 1992. This convention parties approved AIJ projects for measures against global warming. The 1st Conference of the Parties (COPI) held in 1995 approved the pilot phase of AIJ by voluntary workers jointly with developing countries until the end of this century. The trend, level and future plan of energy conservation technologies were researched and analyzed for steelmaking, cement and electric power supply industries in both the Philippine and Thailand. The possibility of AIJ projects was studied by selecting several Japanese energy conservation technologies transferable to both countries. The same research was also carried out for forest as carbon absorption source. 5 refs., 23 figs., 58 tabs.

  8. Basic research on energy conservation in developing countries. Report of the International Conference on Adaptation and Mitigation Technologies for Climate Change; Hatten tojokoku energy shohi koritsuka kiso chosanado jigyo. Kiko hendo ni kansuru tekio kanwa gijutsu kokusai kaigi hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The International Conference on Adaptation and Mitigation Technologies for Climate Change was held based on the 1st Conference of the Parties in 1995 of the United Nations Framework Convention on Climate Change, and the 2nd evaluation report of the Intergovernmental Panel on Climate Change (IPCC). This report carries the outline of this conference and minutes. Japanese government had studied the framework of activities implemented jointly (AIJ) for emission control of greenhouse gases by voluntary workers jointly with developing countries. The government decided the basis of the AIJ Japan program in 1995, and approved the evaluation guidelines of this program including confirmed and considered matters which are necessary for government offices related to this program to evaluate and approve each project. IPCC approved the 2nd evaluation report in its general meeting in 1995. This conference was thus held to discuss strategic technology and international cooperation with participation of writers of the 2nd IPCC report, policy planners of Asian countries, Japanese industries, governmental offices and NGO.

  9. Construction of pilot system for the Korea information system of occupational exposure

    International Nuclear Information System (INIS)

    Na, Seong Ho; Park, Moon Il; Im, Bok Soo; Lee, Seon Mi; Kim, Hyung Uk; Chae, Eun Yeong

    2003-01-01

    In this study, the construction of Korea Information System of Occupational Exposure (KISOE) system is designed with occupational exposure control system based on information evaluation technology and it makes the reliability of the personal exposure by use of personal dose verification. While the operation of national based radiation worker protection system, this system are settled the control system for radiation worker and ALARA. The purpose of construction and operation of pilot system of KISOE systematically is to derive the master plan of KISOE, stable development of this system, and serve the high quality radiation use internationally

  10. Construction of pilot system for the Korea information system of occupational exposure

    Energy Technology Data Exchange (ETDEWEB)

    Na, Seong Ho [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Park, Moon Il; Im, Bok Soo; Lee, Seon Mi; Kim, Hyung Uk; Chae, Eun Yeong [ADDLAB Co., Ltd., Taejon (Korea, Republic of)

    2003-01-15

    In this study, the construction of Korea Information System of Occupational Exposure (KISOE) system is designed with occupational exposure control system based on information evaluation technology and it makes the reliability of the personal exposure by use of personal dose verification. While the operation of national based radiation worker protection system, this system are settled the control system for radiation worker and ALARA. The purpose of construction and operation of pilot system of KISOE systematically is to derive the master plan of KISOE, stable development of this system, and serve the high quality radiation use internationally.

  11. Basic survey project of advanced efficiency of energy consumption in developing countries. Cooperation survey of efficient consumption of petroleum (survey of industrial foundation in the Philippines); Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo sekiyu shohi koritsuka kyoryoku chosa. Philippine koku sangyo kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The purpose of the survey is to promote the international research cooperation projects from the survey stage, via demonstration research stage to the diffusion stage. Field surveys have been conducted to find out the needs of energy saving and environmental technology for the efficient consumption of petroleum in the developing countries with mass-consumption of petroleum in the future. The survey was conducted in the Philippines in the FY 1996. Next developing themes were proposed. The first theme was developing method of sugar plant. The magnesia method has been developed as a basic technology for cleaning sugar solution process instead of using lime. By the recycling method, the waste cake amount can be remarkably reduced. The second theme was electron beam exhaust gas treatment by a dry method of simultaneous desulfurization and denitrification of high concentration SOx and NOx in the fertilizer production plants. The third theme was the energy saving technology for SOx reduction of heating furnace for iron-steel by using an ultra energy saving-type regenerative burner. The last theme was chlorine bypass technology in cement industry, which would become an advanced technology development for the use of chlorine containing fuels in the near future. 40 refs., 36 figs., 79 tabs.

  12. Research report of fiscal 1997. Basic research project on energy saving in developing countries (cooperative research on oil saving / basic research on the industry of Thailand); 1997 nendo chosa hokokusho. Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo sekiyu shohi koritsuka kyoryoku chosa (Taikoku sangyo kiso chosa hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Field research was made for oil saving in Thailand. To promote energy saving in a textile industry as main export industry, its motivation for production stuff is essential in business improvement. Proposal for work improvement, supply system of bonuses, and small-group activity are effective. Management of an energy consumption rate is essential in business management. Use of efficient waste water treatment equipment is also one of the issues. In food factories, various scopes for improvement are still found by mass/heat balance analysis in production process. As an example, a large amount of water is consumed in vain for washing raw rice in a rice powder factory, and separation of SS precipitate from waste water should be improved. Because of lagoon treatment, an effluent standard is not achieved in spite of consumption of wasteful aeration power. This treatment is reasonable because of its scale and site, although the standard can be achieved by activated sludge method. Reconsideration of the standard is also necessary based on a local total BOD load capacity. The profitability of a methane fermentation method should be examined. 72 figs., 95 tabs.

  13. An Economic Analysis of Naval Integrated vs Conventional Personnel Systems.

    Science.gov (United States)

    1983-06-01

    kiso, EPICS training is clustered by levels; training for subsequent levels is not administered until individual trainees demonstrate competence (and...instructional modules, JPAs, and staff support, are ccmbined with training costs. B. TBESIS COST ANALISIS 1. Asmpigi Cne of the underlying assumptions of he

  14. Isostatic gravity map of the Monterey 30 x 60 minute quadrangle and adjacent areas, California

    Science.gov (United States)

    Langenheim, V.E.; Stiles, S.R.; Jachens, R.C.

    2002-01-01

    The digital dataset consists of one file (monterey_100k.iso) containing 2,385 gravity stations. The file, monterey_100k.iso, contains the principal facts of the gravity stations, with one point coded per line. The format of the data is described below. Each gravity station has a station name, location (latitude and longitude, NAD27 projection), elevation, and an observed gravity reading. The data are on the IGSN71 datum and the reference ellipsoid is the Geodetic Reference System 1967 (GRS67). The free-air gravity anomalies were calculated using standard formulas (Telford and others, 1976). The Bouguer, curvature, and terrain corrections were applied to the free-air anomaly at each station to determine the complete Bouguer gravity anomalies at a reduction density of 2.67 g/cc. An isostatic correction was then applied to remove the long-wavelength effect of deep crustal and/or upper mantle masses that isostatically support regional topography.

  15. Fiscal 1999 technical survey report. Basic project on international cooperation on energy consumption improvement, etc. (Japan International Cooperation Center project on promotion of exchange of specialists); 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo chosa hokokusho. Kokusai kyoryoku center jigyo suishin senmonka koryu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    Specialist related to the governments of Thailand, Malaysia, and Indonesia where NEDO (New Energy and Industrial Technology Development Organization) implements its model projects were invited. They exchanged opinions with officials of the Japanese Government and affiliated organizations over measures for effective energy utilization. Opinions were also exchanged over the response of energy-consuming industries, development of technologies, and the status of their adoption. Activities of government-related participants are described below. Under a Model Project for Utilization of Waste Heat from Incineration of Industrial Waste at Industrial Estate, five Thai people with Industrial Estate of Thailand visited Ministry of International Trade and Industry, NEDO, NKK Corporation, Toyota Motor Corporation, and Keiyo Food Industrial Park. Under a model project on the recovery of waste heat from paper sludge incineration, four Malaysian people with Ministry of Energy, Communications and Multimedia or with Energy Center visited Ministry of International Trade and Industry, NEDO, NKK Corporation, Toyota Motor Corporation, and Japan Paperboard Industries Co., Ltd. Under a model project on the utilization of paper sludge and solid waste, four Indonesian people with Ministry of Industry and Trade or with Ministry of Mines and Energy visited Ministry of International Trade and Industry, NEDO, Babcock-Hitachi K.K., and Oji Paper Co., Ltd. (NEDO)

  16. Tritium concentrations of environmental waters in Aichi Prefecture

    International Nuclear Information System (INIS)

    Ohnuma, Shoko; Chaya, Kunio

    1992-01-01

    Tritium concentrations of environmental waters in Aichi Prefecture were determined from 1973 to 1989. They are rain water, river waters and sea waters. In 1970's, tritium concentrations of environmental waters were more than the natural levels under the influence of the atmospheric nuclear tests. However, atmospheric nuclear tests have not been carried out after Oct. 1980 and the tritium concentrations are going to return to the natural levels. Annual means of tritium concentration in 1989 were as follows: 0.67 Bq/l for rain water, 1.1 Bq/l for Kiso river and Shonai river, 0.85 Bq/l for Yahagi river, 0.70 Bq/l for Toyo river, and 0.41 Bq/l for surface sea water. Also tritium concentration of sea bottom water was 0.50±0.28 Bq/l and rather constant yearly. Among environmental waters, only rain water was previously having seasonal variation of tritium concentration and it was showing 'spring peak' when the troposphere and the stratosphere were mixed actively. At present, tritium concentration of rain water has a little seasonal variation, and is slightly lower in summer under the influence of the atmosphere coming over from the ocean. With regard to the direct influence of rain water to river waters, it was found by means of time series analysis that Kiso river was the least affected of river waters and Yahagi river was the most. The apparent residence time, in which rain water stayed in the underground before it flowed out as river water, was presumed to be 4.9 years for Kiso river, 3.6 years for Yahagi river, 2.0 years for Toyo river, respectively. (author)

  17. Tritium concentrations of environmental waters in Aichi Prefecture

    Energy Technology Data Exchange (ETDEWEB)

    Ohnuma, Shoko; Chaya, Kunio (Aichi Prefectural Inst. of Public Health, Nagoya (Japan))

    1992-09-01

    Tritium concentrations of environmental waters in Aichi Prefecture were determined from 1973 to 1989. They are rain water, river waters and sea waters. In 1970's, tritium concentrations of environmental waters were more than the natural levels under the influence of the atmospheric nuclear tests. However, atmospheric nuclear tests have not been carried out after Oct. 1980 and the tritium concentrations are going to return to the natural levels. Annual means of tritium concentration in 1989 were as follows: 0.67 Bq/l for rain water, 1.1 Bq/l for Kiso river and Shonai river, 0.85 Bq/l for Yahagi river, 0.70 Bq/l for Toyo river, and 0.41 Bq/l for surface sea water. Also tritium concentration of sea bottom water was 0.50[+-]0.28 Bq/l and rather constant yearly. Among environmental waters, only rain water was previously having seasonal variation of tritium concentration and it was showing 'spring peak' when the troposphere and the stratosphere were mixed actively. At present, tritium concentration of rain water has a little seasonal variation, and is slightly lower in summer under the influence of the atmosphere coming over from the ocean. With regard to the direct influence of rain water to river waters, it was found by means of time series analysis that Kiso river was the least affected of river waters and Yahagi river was the most. The apparent residence time, in which rain water stayed in the underground before it flowed out as river water, was presumed to be 4.9 years for Kiso river, 3.6 years for Yahagi river, 2.0 years for Toyo river, respectively. (author).

  18. Constraining the Type of Central Engine of GRBs with Swift Data

    Science.gov (United States)

    Li, Liang; Wu, Xue-Feng; Lei, Wei-Hua; Dai, Zi-Gao; Lian, En-Wei; Ryde, Felix

    2018-06-01

    The central engine of gamma-ray bursts (GRBs) is poorly constrained. There exist two main candidates: a fast-rotating black hole and a rapidly spinning magnetar. Furthermore, X-ray plateaus are widely accepted to be the energy injection into the external shock. In this paper, we systematically analyze the Swift/XRT light curves of 101 GRBs having plateau phases and known redshifts (before 2017 May). Since a maximum energy budget (∼2 × 1052 erg) exists for magnetars but not for black holes, this provides a good clue to identifying the type of GRB central engine. We calculate the isotropic kinetic energy E K,iso and the isotropic X-ray energy release E X,iso for individual GRBs. We identify three categories based on how likely a black hole harbors a central engine: “Gold” (9 out of 101; both E X,iso and E K,iso exceed the energy budget), “Silver” (69 out of 101; E X,iso less than the limit but E K,iso greater than the limit), and “Bronze” (23 out of 101; the energies are not above the limit). We then derive and test the black hole parameters with the Blandford–Znajek mechanism, and find that the observations of the black hole candidate (“Gold” + “Silver”) samples are consistent with the expectations of the black hole model. Furthermore, we also test the magnetar candidate (“Bronze”) sample with the magnetar model, and find that the magnetar surface magnetic field (B p ) and initial spin period (P 0) fall into reasonable ranges. Our analysis indicates that if the magnetar wind is isotropic, a magnetar central engine is possible for 20% of the analyzed GRBs. For most GRBs, a black hole is most likely operating.

  19. KISO METAR

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — METAR is a routine scheduled observation and is the primary observation code used in the United States to satisfy requirements for reporting surface meteorological...

  20. GRB follow-up observations in the East-Asian region

    International Nuclear Information System (INIS)

    Tamagawa, T.; Urata, Y.; Tokyo Institute of Technology, Tokyo; Huang, K. Y.; Ip, W.H.; Qiu, Y.; Hu, J.Y.; Zhou, Xn.; Onda, K.; Tokyo Univ. of Sciences, Tokyo; Makishima, K.; Tokyo Univ., Tokyo

    2005-01-01

    In 2004, we established a Japan-Taiwan-China collaboration for GBR study in the East-Asian region. This serves as a valuable addiction to the world-wide optical and infrared follow-up network, because the East-Asia region would otherwise be blank. We have been carrying out imaging and spectroscopy follow-up observations at Lulin (Taiwan), Kiso (Japan), WIDGET (Japan) and Xinglong (China). From Xinglong and Kiso, we can locate candidates and obtain early time spectra for afterglows. While WIDGET provides early time observations before the bursts, the high-time resolution for multi-band light curves can be obtained at Lulin. With the data from these sites, we can obtain detailed information about the light curve and redshift of GRBs, which are important to understand the mechanism of the afterglows. Up to March 2005, ten follow-up observations have been provided by this East-Asia cooperation. Two optical afterglows were detected, GRB 040924 and GRB 041006. The results of the two detected afterglows are reported in this paper

  1. GRB follow-up observations in the East-Asian region

    Energy Technology Data Exchange (ETDEWEB)

    Tamagawa, T. [RIKEN, Saitama (Japan); Urata, Y. [RIKEN, Saitama (Japan); Tokyo Institute of Technology, Tokyo (Japan). Department of Physics; Huang, K. Y.; Ip, W.H. [National Centre University, Tokyo (Japan). Institute of Astronomy; Qiu, Y.; Hu, J.Y.; Zhou, Xn. [Chinese Academy of Sciences, Beijing (China). National Astronomical Observatoires; Onda, K. [RIKEN, Saitama (Japan); Tokyo Univ. of Sciences, Tokyo (Japan). Department of Physics; Makishima, K. [RIKEN, Saitama (Japan); Tokyo Univ., Tokyo (Japan). Department of Physics

    2005-07-15

    In 2004, we established a Japan-Taiwan-China collaboration for GBR study in the East-Asian region. This serves as a valuable addiction to the world-wide optical and infrared follow-up network, because the East-Asia region would otherwise be blank. We have been carrying out imaging and spectroscopy follow-up observations at Lulin (Taiwan), Kiso (Japan), WIDGET (Japan) and Xinglong (China). From Xinglong and Kiso, we can locate candidates and obtain early time spectra for afterglows. While WIDGET provides early time observations before the bursts, the high-time resolution for multi-band light curves can be obtained at Lulin. With the data from these sites, we can obtain detailed information about the light curve and redshift of GRBs, which are important to understand the mechanism of the afterglows. Up to March 2005, ten follow-up observations have been provided by this East-Asia cooperation. Two optical afterglows were detected, GRB 040924 and GRB 041006. The results of the two detected afterglows are reported in this paper.

  2. FY 1999 report on the survey of the basic cooperation project of enhancement of the international energy consumption efficiency. Project on promotion of exchanges with the persons concerned with government agencies, etc.; 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo, kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo chosa hokokusho. Seifu kikan nado kankeisha koryu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of promoting the understanding of effective energy utilization and constructing corporative relations between countries, the persons concerned with government agencies of India, China, Indonesia, Vietnam, Myanmar and Thailand were invited to Japan, and exchanges of opinions were made on policies, technical development, the state of the introduction, etc. The persons concerned with governments of India, China and Indonesia participate in NEDO Forum 2001 to give lectures on the energy policy of their own. The persons sent from the Vietnamese government paid visits for survey to NEDO, Obayashi Corp., Kawasaki Heavy Industries, Ltd., Mitsubishi Materials Corp. and Taiheiyo Cement Corp. as reference of the model project on cement sintering plant power reduction. The persons sent from the Myanmar government paid visits for survey to NEDO, ECCJ, Chiyoda Corp., Yokogawa Electric Corp. and Cosmo Oil Co. as reference of the model project on energy conservation at fertilizer plant. The persons concerned with the Thai government paid visits for survey to the plants concerned with the model project on residue combustion waste heat recovery facilities at paper mills and the model project on waste heat recovery at steel material heating furnace. (NEDO)

  3. The role of soil pH on soil carbonic anhydrase activity

    Science.gov (United States)

    Sauze, Joana; Jones, Sam P.; Wingate, Lisa; Wohl, Steven; Ogée, Jérôme

    2018-01-01

    Carbonic anhydrases (CAs) are metalloenzymes present in plants and microorganisms that catalyse the interconversion of CO2 and water to bicarbonate and protons. Because oxygen isotopes are also exchanged during this reaction, the presence of CA also modifies the contribution of soil and plant CO18O fluxes to the global budget of atmospheric CO18O. The oxygen isotope signatures (δ18O) of these fluxes differ as leaf water pools are usually more enriched than soil water pools, and this difference is used to partition the net CO2 flux over land into soil respiration and plant photosynthesis. Nonetheless, the use of atmospheric CO18O as a tracer of land surface CO2 fluxes requires a good knowledge of soil CA activity. Previous studies have shown that significant differences in soil CA activity are found in different biomes and seasons, but our understanding of the environmental and ecological drivers responsible for the spatial and temporal patterns observed in soil CA activity is still limited. One factor that has been overlooked so far is pH. Soil pH is known to strongly influence microbial community composition, richness and diversity in addition to governing the speciation of CO2 between the different carbonate forms. In this study we investigated the CO2-H2O isotopic exchange rate (kiso) in six soils with pH varying from 4.5 to 8.5. We also artificially increased the soil CA concentration to test how pH and other soil properties (texture and phosphate content) affected the relationship between kiso and CA concentration. We found that soil pH was the primary driver of kiso after CA addition and that the chemical composition (i.e. phosphate content) played only a secondary role. We also found an offset between the δ18O of the water pool with which CO2 equilibrates and total soil water (i.e. water extracted by vacuum distillation) that varied with soil texture. The reasons for this offset are still unknown.

  4. The role of soil pH on soil carbonic anhydrase activity

    Directory of Open Access Journals (Sweden)

    J. Sauze

    2018-01-01

    Full Text Available Carbonic anhydrases (CAs are metalloenzymes present in plants and microorganisms that catalyse the interconversion of CO2 and water to bicarbonate and protons. Because oxygen isotopes are also exchanged during this reaction, the presence of CA also modifies the contribution of soil and plant CO18O fluxes to the global budget of atmospheric CO18O. The oxygen isotope signatures (δ18O of these fluxes differ as leaf water pools are usually more enriched than soil water pools, and this difference is used to partition the net CO2 flux over land into soil respiration and plant photosynthesis. Nonetheless, the use of atmospheric CO18O as a tracer of land surface CO2 fluxes requires a good knowledge of soil CA activity. Previous studies have shown that significant differences in soil CA activity are found in different biomes and seasons, but our understanding of the environmental and ecological drivers responsible for the spatial and temporal patterns observed in soil CA activity is still limited. One factor that has been overlooked so far is pH. Soil pH is known to strongly influence microbial community composition, richness and diversity in addition to governing the speciation of CO2 between the different carbonate forms. In this study we investigated the CO2–H2O isotopic exchange rate (kiso in six soils with pH varying from 4.5 to 8.5. We also artificially increased the soil CA concentration to test how pH and other soil properties (texture and phosphate content affected the relationship between kiso and CA concentration. We found that soil pH was the primary driver of kiso after CA addition and that the chemical composition (i.e. phosphate content played only a secondary role. We also found an offset between the δ18O of the water pool with which CO2 equilibrates and total soil water (i.e. water extracted by vacuum distillation that varied with soil texture. The reasons for this offset are still unknown.

  5. Research report for fiscal 1998 on the basic research for energy consumption efficiency improvement in developing countries. Joint research for oil consumption efficiency improvement. Indonesia; 1998 nendo hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo sekiyu shohi koritsuka kyoryoku chosa jigyochosa hokokusho. Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    On-site researches are conducted to study the possibility of a model business using energy-saving and environment preservation technologies of Japan and Indonesia. At textile plants, the management of heat and water in the dyeing and finishing processes is found inadequate, with great quantities of heat left uncared-for in medium- and low-temperature wastewater. An energy-saving proposition is submitted in which solar energy and absorption-type refrigerators are combined. Instrumentation and management also require improvement. At nitrogenous and phosphatic fertilizer plants, the energy consumption rate is found aggravated by degradation of facilities, and continued research and further analysis are necessary before working out energy-saving policies for them. At urea fertilizer plants, though it is not easy to modernize the manufacturing processes, energy-saving and environment preserving efforts are under way within the bounds of capability. Their energy consumption rate is high because of frequent shut-downs. It is necessary to detect an anomaly at its early stage and to introduce backup systems for the elimination of erroneous operations. Operating conditions need to be analyzed for validity. At melamine manufacturing plants, process drainage is allowed into the river without any treatment contaminating the water with products of melamine hydrolysis. Short-term and long-term solutions are suggested. (NEDO)

  6. FY 1997 basic survey project (database construction project) for enhancing energy consumption efficiency in developing countries; 1997 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo. Database kochiku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    NEDO is promoting a database construction project to collect and supply various technical/systematical information on energy related data and energy effective utilization. In FY 1997, about the Philippines, Indonesia and China, the data collected in a year were renewed, and seminar/workshop were held as a part of the promotion activities. About Thailand, Malaysia, Korea, Taiwan and Japan, Japan has independently been collecting the data. Also in FY 1997, Japan arranged the existing data and arranged/collected the data. About Vietnam, India, Myanmer and Pakistan, which became the objects for the project newly in FY 1996, the state of data arrangement was confirmed and the data were collected. Moreover, functional improvement of the system was made so that each country can use the database more easily and maintain the data independently. (NEDO)

  7. 河川水, 海水のCu, Pb, Cd, Znの分布と, その河口域における挙動の予察的研究

    OpenAIRE

    佐藤, 修; Sato, Osamu

    1980-01-01

    This report describes the distribution and speciation of Cu, Pb, Cd and Zn in natural waters and the laboratory experiments to examine the effects on river water of NaCl. Samples were collected from Tenpaku River, Kiso River, Toyo River and Atsumi Bay. The distribution of labile and total metales were determined by differential pulse anodic stripping voltammetry (DPASV) before and after u. v. irradiation. CornpIexing capacity was determined by the method proposed by CHAU (1974). Analysis of T...

  8. kiso Terminal Aerodrome Forecast

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — TAF (terminal aerodrome forecast or terminal area forecast) is a format for reporting weather forecast information, particularly as it relates to aviation. TAFs are...

  9. Fiscal 1997 research report. Basic research project on improving energy consumption efficiency in developing countries (Database construction); 1998 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo hokokusho. Database kochiku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    The New Energy and Industrial Technology Development Organization (NEDO) in fiscal 1993 started a database construction project, which involves energy conservation related primary information on the 11 countries concerned, for encouraging 11 Asian countries, namely, Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan, Korea, Vietnam, Myanmar, and Pakistan, to promote their energy conservation endeavors. As part of the database construction effort under this research project, the so-far accomplished collection of and analysis into energy related information about the countries, surveys of the utilization and popularization of databases, and development of database systems are taken into consideration. On the basis of these efforts to improve on the database systems for enhanced operability, a program is formulated for database diffusion under which data are collected and updated for storage in databases. Also exerted under the program are endeavors to make use of the above-said database systems and to disseminate the constructed databases into the 11 countries for effective utilization. In the future, it is desired that the NEDO database will win popularity in the 11 countries and be utilized in their formulation of domestic energy conservation policies. (NEDO)

  10. Fiscal 1999 survey report. Basic survey project on international cooperation for energy consumption efficiency improvement (Project on cooperation for oil consumption efficiency improvement - Fiscal 1999 survey report on Indonesia); Kokusai energy shohi koritsuka nado kyoryoku kiso chosa jigyo / sekiyu shohi koritsuka kyoryoku chosa jigyo. 1999 nendo Indonesia chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The project aims to contribute to the promotion of international research cooperation ranging from the survey stage through the stages of verification study and popularization, and, for this purpose, it conducts on-site investigations for exploring needs for environmentally-friendly energy-saving technologies in developing countries where there will be massive-scale oil consumption in the future. In this report, surveys and deliberations are conducted to embody proposed measures, and findings are compiled, based on the surveys conducted in the preceding financial year relating to energy efficiency in and environmental technologies for the textile and chemical industries. Much is expected from the proposed measures as promising subjects of joint verification researches. A technology is proposed for energy saving in the textile industry of Indonesia. The technology aims to wash cloth using high-pressure water from a special nozzle, to continuously measure the level of contamination of the waste water, and to feed back the measured values to the water supply side for the automatic optimization of the amount of the washing water and for the utilization of warm waste water for the ultimate purpose of cascade-aided energy saving. As for the proposition for recovering chemicals mainly caustic soda, it achieves environmental improvement and energy saving in the chemical industry simultaneously. (NEDO)

  11. Pathogenesis of Septic Acute Lung Injury and Strategies for Immuno-Pharmacological Therapy.

    Science.gov (United States)

    1996-10-01

    J Cell Biol 120:1227-1235. 90. Lasky, L. A., M. S. Singer, D. Dowbenko, Y. Imai, W. J. Henzel, C. Grimley, C. Fennie , N. Gillett, S. R. Watson, and...Rats. J. Immunol 152:832-840. 102. Lasky, L. A., M. S. Singer, T. A. Yednock, D. Dowbenko, C. Fennie , H. Rodriguez, T. Nguyen, S. Stachel, and S. D...1132-1135. 105. Foxall, C. R., S. R. Watson, C. Fennie , L. A. Lasky, M. Kiso, A. Hasegawa, D. Asa, and B. Brandley. 1992. The three members of the

  12. Fiscal 1999 technical survey report. Basic survey for energy consumption rationalization and cooperative project on energy conservation seminar; 1999 nendo energy shohi koritsuka kiso chosa oyobi sho energy seminar kyoryoku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-01

    A survey was conducted of Myanmar's energy-consuming industries for exploring the feasibility of introducing practical energy conservation techniques and facilities to this country and for collecting basic data for the implementation of the project in the future. On the other hand, some lecturers were dispatched to an energy conservation seminar which was held in cooperation with the Government of Myanmar. Visited during the basic survey were (1) the Kyan Gin plant of Myanmar Ceramic Enterprise representing Myanmar's cement making industry, (2) the Thanlyin plant of Myanmar Petrochemical Enterprise representing Myanmar's oil refining industry, and (3) the Siftong plant of Myanmar Paper and Chemical Enterprise representing Myanmar's paper making industry. In the study of energy conservation measures for which stabilization of operation through reinforced facility maintenance and management were required, it was concluded that much time was necessary before Japan's advanced energy conservation technologies might be introduced into Myanmar. Three to six propositions were presented to each of the three plants. At the seminar, the importance of energy conservation promoting measures and the results of the basic survey were introduced to the audience. A lecture meeting was also held to familiarize some participants with NEDO-DB (Database of New Energy and Industrial Technology Development Organization). (NEDO)

  13. A survey of northern Bok globules for H-alpha emission stars

    International Nuclear Information System (INIS)

    Ogura, Katsuo; Hasegawa, Tatsuhiko.

    1983-01-01

    Northern globules in the catalog of Bok and Cordwell (1973) have been surveyed for Hα-emission stars of T Tau type by using the Kiso Schmidt telescope with an objective prism. The results for 15 globules are presented here. A total of 60 emission-line stars, of which 80 % are new, and 17 suspected ones have been discovered. Some of them are known T Tau stars; one star shows Ca 2 H and K lines in emission on objective-prism plates in the blue-violet and presumably is a new T Tau star. The celestial coordinates and rough estimates of magnitude and color are given for all of the objects. (author)

  14. Report on investigations in fiscal 2000 on the global warming prevention related investigations in cooperative fundamental project of investigating improvement in international energy consumption efficiency. Analysis and comparison centering on cost effectiveness in relation with greenhouse gas (GHG) reduction in Japan; 2000 nendo kokusai energy shohi koritsuka chosanado kyoryoku kiso jigyo chikyu ondanka boshi kanren chosa hokokusho. Kokunai deno GHG sakyugen ni kansuru hiyo tai koka wo chushin to shita bunseki hikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The present investigative research is intended to grasp the whole image of cost effectiveness of the energy saving and new energy technologies to suppress and reduce CO2 emission in Japan. Furthermore, the research considers the cost effectiveness and discusses the efficiency and the directionality of reducing CO2 emission from an estimation of the social introduction cost of individual technologies and quantity of CO2 emission reduction. These activities are intended to provide the fundamental items of information when discussing the measures to achieve the emission reduction target imposed on Japan. The research divides the whole aspect into energy conversion, industrial, consumer and transportation departments for discussion, and calculates the technological items that can be introduced by 2010 and the quantity of the introduction thereof, as well as the effect of reducing CO2 emission. Calculations are also performed on 27 elementary technologies in total and the CO2 emission reducing effect, assuming technological possibilities. Subsequently, analyses are carried out from the viewpoint of cost effectiveness by departments. It is shown that the average cost effectiveness is distributed in the range from 108,000 yen/ton to 1,129,000 yen/ton. Scenarios of reducing CO2 emission are discussed from the analyses of the cost effectiveness. (NEDO)

  15. Fiscal 1996 research report. Basic research on energy consumption efficiency improvement for developing countries (Industry related survey for energy analysis); 1996 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo hokokusho. Energy bunsekiyo sangyo renkan chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Inter-industry relations tables and energy statistics are combined for Asian countries for the preparation of energy analysis oriented inter-industry relations tables, which are used to metrically analyze Aisan nations' industrial structures and energy consumption structures for the ultimate purpose of grasping the magnitude of each industry's demand for energy. The tables prepared this year cover Korea, Indonesia, Thailand, and the Philippines. In Korea, the self-sufficiency rate of mineral fuels is low at 23.1%, which is due to its import of crude oil from abroad. It consumes 177.92-million tons (in terms of oil) of energy for its economic activities, with energy saving measures expected to work effectively here. Indonesia's mineral fuel self-sufficiency rate is high at 84.3% because it is an oil producing country. The energy it consumes for its economic activities is 179.37-million tons (in terms of oil), and energy saving measures will work effectively here. Thailand is a crude oil importing country. Its mineral fuel self-sufficiency rate is 33.4% and the energy its economic activities consume is 53.08-million tons (in terms of oil), and energy saving measures will work effectively in this country. The Philippines is a crude oil importing country and its mineral fuel self-sufficiency rate is as low as 4.8%. It consumes 22.71-million tons of energy (in terms of oil) for its economic activities, and energy-saving measures are expected to take effect here. (NEDO)

  16. Basic project on the cooperation in enhancement of the international energy consumption efficiency. Survey of energy conservation potential by industry; 2000 nendo kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo hokokusho. Gyoshubetsu sho energy potential chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of looking for measures to promote the effective energy conservation in China, the potential energy conservation amount in general plants was surveyed and analyzed by industry. Activities were made in the following fields: 1) survey of the actual state of energy in main industries; 2) energy conservation potential in the cement industry in China; 3) energy conservation potential in thermal power plants in China. In 1), survey was made on 8 industries including the iron/steel industry and oil refining industry. In 2), survey was made of the actual state of the Liulihe cement plant and Shitou cement plant. The subjects extracted were the arrangement of instrumentation equipment such as the exhaust gas analyzer needed for combustion management, improvement of the air/fuel ratio of kiln, enhancement of cooling efficiency of clinker cooler, etc. In 3), the actual state of the Qinling power plant was surveyed, and it was made clear that high efficiency of 38% or more can be maintained if the appropriate use/maintenance management is made (coal unit consumption: 383g/kWh in Qinling and 309g/kWh). (NEDO)

  17. Basic investigation on promotion of joint implementation in fiscal 2000. Efficiency improvement and energy conservation at Uong Bi power plant; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Uong Bi hatsudensho no koritsuka to sho energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Discussions have been given on energy conservation, and reduction in greenhouse gas emission through efficiency improvement at the Uong Bi coal burning power plant in Vietnam. The Uong Bi power plant, which has become using coal of lower quality than the design value, has had incomplete combustion, resulting in increase of unburned components in ash, and decrease of the boiler efficiency to 65 to 70%. Clinker hopper troubles have been occurring frequently, causing plant shutdown at a number of times. The turbine efficiency also shows as very low value as 26 to 27%. The plan has envisaged replacement of combustion parts of the boilers, withdrawal and replacement of the turbine generation systems, new installation of electric dust collectors, modification of the ash treatment system, additional installation of the re-circulation system, new installation of waste water treatment facilities, and modification of the waste water treatment equipment in the plant premises. As a result of the discussions, the annual energy saving quantity was found to be 62,936 tons of crude oil equivalent for the case where only one turbine is renewed, and 93,298 tons for the case where both of the two turbines are renewed. The annual reduction quantity of the greenhouse gas emission was found to be 251,215 tons and 372,402 t-CO2, respectively. (NEDO)

  18. Basic investigation project for energy consumption efficiency improvement in developing countries. Invitation of engineers from developing countries (Vietnam, Philippines, and India); Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo. Hatten tojokoku gijutsusha shohei jigyo (Betonamu, Philippines, Indo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The International Center of Environmental Technology Transfer has invited seven engineers from Vietnam, eight from Philippines and two from India for human resource education project for environmental preservation in developing countries. Those who were invited are administrative officials and engineers who work at administrative agents, research institutes and corporations related to energy conservation and environment preservation. In this invitation program, lecturers were invited from governmental offices, universities and corporations according to their expertise fields to carry out lectures and site training. With respect to energy conservation, lectures were given on a `summary of energy saving methods` by a lecturer invited from the Chubu Governmental Department of Trade and Industry, and on an `introduction to new energies` by Prof. Shimizu at the Engineering Faculty of the Mie University. Both lecturers emphasized the necessity of energy conservation, and importance of new energies as clean energies. The trainees showed strong interest when they visited a `cement factory` and a `coal burning thermal power plant` as the key industries. Their experience would be reflected strongly on guiding operations of factories in their own countries. 56 figs., 15 tabs.

  19. Survey report for fiscal 1993 on basic survey project for energy consumption efficiency improvement in developing countries. Database development project 5 (The Philippines); 1993 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo (database kochiku jigyo). 5. Philippines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    Volume 5 covers the Philippines. The database development project has two goals. One is to collect basic data for joint projects for preparing energy conservation master plans for China and Indonesia, and the other is to build a comprehensive database for 8 countries including the said 2 countries (China, Indonesia, the Philippines, Thailand, Malaysia, Korea, Taiwan, and Japan) for contribution to the enhancement of energy conservation in the region involved. This Volume 5, dealing with 5 countries out of the 8 excluding China, Indonesia, and Japan, accommodates data on the Philippines, with whom a data collecting contract has just been signed in this fiscal year, which cannot be appropriately accommodated in Volume 1. The data referred to just above include the progress marked in this fiscal year in the preparation for the collection of actual data about energy consumption in Filipino factories scheduled to be carried out in and after the next fiscal year. (NEDO)

  20. VizieR Online Data Catalog: Mira stars discovered in LAMOST DR4 (Yao+, 2017)

    Science.gov (United States)

    Yao, Y.; Liu, C.; Deng, L.; de Grijs, R.; Matsunaga, N.

    2017-10-01

    By the end of 2016 March, the wide-field Large sky Area Multi-Object fiber Spectroscopic Telescope (LAMOST) DR4 catalog had accumulated 7681185 spectra (R=1800), of which 6898298 were of stars. We compiled a photometrically confirmed sample of Mira variables from the Kiso Wide-Field Camera (KWFC) Intensive Survey of the Galactic Plane (KISOGP; Matsunaga 2017, arXiv:1705.08567), the American Association of Variable Star Observers (AAVSO) International Database Variable Star Index (VSX; Watson 2006, B/vsx, version 2017-05-02; we selected stars of variability type "M"), and the SIMBAD Astronomical Database. We first cross-matched the KISOGP and VSX Miras with the LAMOST DR4 catalog. Finally, we cross-matched the DR4 catalog with the SIMBAD database. See section 2. (1 data file).

  1. Hα emission stars in the region of Lynds 1228

    International Nuclear Information System (INIS)

    Ogura, Katsuo; Sato, Fumio.

    1990-01-01

    The dark cloud L1228 and its surrounding region have been surveyed for candidate pre-main-sequence stars by use of the Kiso Schmidt telescope with an objective prism. 69 Hα emission stars and 49 suspects have been found. Their celestial coordinates and rough estimates of their magnitude and color have been derived from the positions and image diameters on Palomar Sky Survey prints. Nine of them cluster in a small area near the central part of L1228, suggesting active star formation there in the near past. A star with a large color index lying in the northern part has been identified with an IRAS point source having a far-infrared spectrum of moderately low temperature. Preliminary 13 CO (J=1-0) line observations show that the star is embedded in the core of the molecular cloud. (author)

  2. Management efficiency improvement promotion of SS; SS no unei koritsuka sokushin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    Full amount fund petroleum product marketer and Sumisyo petroleum of Sumitomo accelerate management efficiency improvement of service station (SS). National about 300 places have been developed in within the year Within SS, it aims at break-even point achievement of gasoline, coarse advantage 10 yen per light oil of 1 liter in 84 all tied SS stores. SS which has realized the system of 10 yen in the current is whole about 50%. But, by doing personnel configurations and operational procedures, that they reexamine the balance management, etc. in half remaining SS 12 yen-13 yen; the efficiency improvement is done thoroughly. (translated by NEDO)

  3. Project of the basic survey of cooperation for the heightening of energy efficiency in developing countries. Project for inviting engineers from developing countries to Japan (Malaysia); Hatten tojokoku energy shohi koritsuka kyoryoku kiso chosa nado jigyo. Hatten tojokoku gijutsusha shohei jigyo (Malaysia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    For the purpose of plannably and effectively spreading the results of demonstrative researches on energy conservation and environmental technology in developing countries which were jointly made with Japan and Japan`s advanced energy conservation and environment technology, etc., the project invited engineers of developing countries to Japan, gave the intensive research instruction, made the required information exchange, and attempted improving R and D ability of the engineers and smoothening transfer/spread of the technology concerned. Malaysia has been advancing strongly the economic growth along `the 6th Malaysia Plan,` and aims, as a national target, at completing industrialization by 2020 and reaching the level of developed countries. However, the environment problem in Malaysia is worsening. In this invitation project, two-week training was given to 15 trainees, paying attention to the following three items: (1) introduction of technologies of energy conservation and environment in Japan, (2) actual field training at research institutes and corporations which have high-technology on energy conservation and environment, and (3) information exchanges with executive officials, scientists, and researchers in Japan. 6 figs.

  4. Basic survey project of advanced efficiency of energy consumption in developing countries. Engineer invitation project from developing countries such as Vietnam, Philippines, China and Thailand; Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo. Hatten tojokoku gijutsusha shohei jigyo (Betonamu, Philippine, Chugoku, Tai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    For contributing to the promotion of energy saving and environmental conservation, eighteen officers and engineers were invited to Japan during the period between January 14th and 23rd in 1997, from Vietnam, Philippines, China and Thailand. This report summarizes the invitation project for training conducted under a theme `Energy saving and environmental conservation.` Lectures were given concerning activities of global environmental conservation by NEDO, history and measures of overcoming the Yokkaichi pollution, outline of new energy, outline of energy saving, outline of basic environment law, outline of final industrial waste treatment facilities, and global environmental issues. Site training was conducted at Hekinan Thermal Power Station of Chubu Electric Power Co., Inc., Fujiwara Works of Onoda-Chichibu Cement Co., Ltd., and Yokkaichi Works of Kyowa Petroleum and Chemistry Co., Ltd. Questions and answers were exchanged. The new energy and energy saving were impressive, and were new concept for the trainees. This project was considered to be continued. The inspection of works was also well received, which was considered to be continued

  5. Fundamental stadies of corrosoin. Part 2; Fushoku no kiso. 2

    Energy Technology Data Exchange (ETDEWEB)

    Tsujino, B. [Univ. of Osaka Prefecture, Osaka (Japan). College of Integrated Arts and Sciences

    1995-10-31

    Short-circuited metals have a considerable effect on the electrochemical reaction in the contact corrosion of different metals. The origin of different metal contact corrosion, effect of area ratio, effect of cathode metal, effects of the concentration and pH of dissolved ions, and corrosion prevention methods are discussed. Atmospheric corrosion varies widely in accordance with the type of environment. Major atmospheric corrosion are classified into those in coastal region, industrial zone, rural area, city area, the tropics, and the frozen zones. Moisture in the air has a big influence on the atmospheric corrosion. Vernon has found the presence of a certain critical humidity at which corrosion rate increases rapidly in the atmospheric corrosion. Long term atmospheric corrosion as well as addition of alloy elements and coating as corrosion protecting methods are discussed. Corrosion by sea water is classified into corrosion by oceanic atmosphere, splash area, tidal zone, and mud layer. Corrosion of metals in soil is influenced by many factors such as moisture resistivity, moisture, air permeability, pH, and property of soil. Pitting corrosion, crevice corrosion, and stress corrosion are outlined. 61 refs., 32 figs., 12 tabs.

  6. Fiscal 2000 report on cooperative basic project on international energy consumption improvement/International conference project such as IPCC. International Symposium on the Kyoto Mechanisms; 2000 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / IPCC nado kokusai kaigi jigyo Kyoto mechanism ni kansuru symposium hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The above-named symposium was held at United Nations University in the period April 12-13, 2001, and the conference is outlined in this report. The symposium aimed to contribute to the progress of international rule making and to the enhancement of mutual understanding through the exchange of views and opinions by negotiators representing their countries over the Kyoto mechanisms, the rule of emissions trading in particular, and through the analysis of negotiators' options; to discuss how international rules should be from a practical viewpoint with the participation of people related to the market or industries and engaged actively in the implementation of the mechanisms; to enrich Japanese people's knowledge about the mechanisms and to enhance their understanding of greenhouse gas emissions reduction techniques making use of the mechanism of the market; and so forth. The conference included Session 1: Current status of international negotiations and views from parties, Session 2: Toward credible and workable scheme of the mechanisms (Parts 1 and 2), and Session 3: Emissions trading - Outstanding issues and options. (NEDO)

  7. Fiscal 2000 report on cooperative basic project on international energy consumption improvement/International conference project such as IPCC. International Symposium on the Kyoto Mechanisms; 2000 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / IPCC nado kokusai kaigi jigyo Kyoto mechanism ni kansuru symposium hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The above-named symposium was held at United Nations University in the period April 12-13, 2001, and the conference is outlined in this report. The symposium aimed to contribute to the progress of international rule making and to the enhancement of mutual understanding through the exchange of views and opinions by negotiators representing their countries over the Kyoto mechanisms, the rule of emissions trading in particular, and through the analysis of negotiators' options; to discuss how international rules should be from a practical viewpoint with the participation of people related to the market or industries and engaged actively in the implementation of the mechanisms; to enrich Japanese people's knowledge about the mechanisms and to enhance their understanding of greenhouse gas emissions reduction techniques making use of the mechanism of the market; and so forth. The conference included Session 1: Current status of international negotiations and views from parties, Session 2: Toward credible and workable scheme of the mechanisms (Parts 1 and 2), and Session 3: Emissions trading - Outstanding issues and options. (NEDO)

  8. Fiscal 2000 cooperative basic project for investigation of efficiency in international energy consumption. Project for inviting researchers from developing countries (Indonesia, Philippines, Thailand and Vietnam); 2000 nendo kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo hokokusho. Hatten tojokoku kenkyusha shohei jigyo (Indonesia, Philippines, Tai, Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    As a part of international cooperation concerning global environmental issues, ICETT (International Center for Environmental Technology Transfer) invited administrative officers, engineers, etc., of developing countries, for the purpose of encouraging experts connected with energy conservation and environmental protection technologies, providing training on the administrative technique, antipollution technologies, energy conservation technologies, etc. The training period was from December 3 to 21, 2000, with 12 participants attended, three each from four countries, Indonesia, Philippines, Thailand and Vietnam. The contents of the technological instruction were such that cases in Japan concerning energy conservation and environmental protection were introduced generally from the administrative measures to the technological countermeasures, as were done conventionally. In the area of the environmental protection, lectures and tours on wastewater treatment were added as industrial wastewater control measures. In the subject of new energy, micro hydraulic power was added which is in progress for example in Indonesia under an aid from Japan. In the energy conservation technology, a supplementary lecture was given on the concept and methodology of an environment-protective type production technology, with emphasis placed on the energy conservation and environmental protection in manufacturing plants and production processes. (NEDO)

  9. Report on fiscal 1996 basic survey project for efficient use of energy in developing countries - database building project. Part 2. Decision on data base dissemination plan; 1996 nendo hatten tojokoku energy koritsuka kiso chosa jigyo (database kochiku jigyo) hokokusho. 2. Database no fukyu keikaku no sakutei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    A dissemination plan was decided on concerning an energy-related database, which has been prepared in the eight countries including Japan in the Asian Pacific region since fiscal 1993. The database is so designed that the energy-related data of the eight countries are retained equally by each country and that the data of all these countries are readily made available in each of these counties in the same manner as retrieving the data of its own. It is necessary that each country establishes a system of amassing data of its own and collecting the data continuously as well as renewing the data mutually with the other countries. The disseminating/enlightening measures of the database were extracted from such viewpoints as enhancing the recognition level, educating/enlightening the usage, teaching the operation method, and customizing the NEDO-DB. In addition, a plan was prepared in which organizations/institutions, as the object of the dissemination and enlightenment in each country, were classified into four groups based on the relation to their counterpart and on the possibility of the database utilization, with a schedule made for each group as to the implementation of each of the disseminating/enlightening measures. (NEDO)

  10. Project for the basic survey of enhancing energy consumption efficiency in developing countries. Summary of the Conference on the Policies and Measures of Climate Change Mitigation; Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo. Kiko hendo kanwasaku no seisaku to sochi ni kansuru kokusai kaigi hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The Conference on the Policies and Measures of Climate Change Mitigation was held in Tokyo on January 28, 1997, with participation in the conference from governments, research institutes, industrial circles, NGO, etc. of ten countries including Japan. In the session `technology transfer,` presentations were made on `the current status of the technology transfer, and the expectation and requests` by Australia and Japan which provide technology and by China which receives technology. As a whole, every country recognized importance of technology transfer of both hardware and software, private sectors` taking leadership, the use of international organizations dealing with fund supply and credit guarantee. In the session `tradable permits/quotas,` Dr. A. Haspel, U.S. Department of Energy reported the structure and effect of U.S. tradable emission permits on sulfur dioxide from thermal power plants, and proposed tradable emission permits against greenhouse effect gas. The proposal needs to be further studied and discussed, and it was regarded as too early to include the proposal in the protocol to be conducted at COP3

  11. Measurement of 14C time scale of the rings of a tree by accelerator mass spectrometry

    International Nuclear Information System (INIS)

    Oda, Hirotaka; Furukawa, Michiaki; Yonenobu, Hitoshi; Ikeda, Akiko; Nakamura, Toshio.

    1996-01-01

    14 C time scale is different from a histrical data in order that it is calculated by assuming that the concentration of 14 C in the sample has not been changed by age. The object of this work is to make clear the errors in measurement of 14 C time scale of the ring of a tree known the tree age. The every year ring of a Hinoki in Kiso, 950 years old, was used as a sample. The most external ring is determined as 1923 years old on the basis of the dendrochronology. The rings after 1120 years were used as the samples. α-cellulose, the most stable component in the structural components of cell of tree, was prepared from each ring. About 8 mg of α-cellulose was reduced to graphite to be measured by the tandem thoron analytic meter. The results obtained showed that 14 C time scale was older than that of the histrical data in the twelfth and thirteenth century, but it was more new than that of the histrical data from the late seventeenth to the middle of eighteenth century. The results were agreement with that of Stuiver and Pearson (1933). (S.Y.)

  12. Development and application of groundwater flow meter in fractured rocks: Measurement of velocity and direction of groundwater flow in single well

    International Nuclear Information System (INIS)

    Kawanishi, M.; Miyakawa, K.; Hirata, Y.

    2001-01-01

    For the confirmation of safety for the geological disposal of radioactive wastes, it is very important to demonstrate the groundwater flow by in-situ investigation in the deep underground. We have developed a groundwater flow meter to measure simultaneously the velocity and direction of groundwater flow by means of detecting the electric potential difference between the groundwater to evaluate and the distilled water as a tracer in a single well. In this paper, we describe the outline of the groundwater flow meter system developed by CRIEPI and Taisei-Kiso-Sekkei Co. Ltd. and the evaluation methodology for observed data by using it in fractured rocks. Furthermore, applied results to in-situ tests at the Tounou mine of Japan Nuclear Fuel Cycle Development Institute (JNC) and the Aespoe Hard Rock Laboratory (HRL) of Swedish Nuclear Fuel and Waste Management Co. (SK) are described. Both sites are different type of fractured rock formations of granite. From these results, it was made clear that this flow meter system can be practically used to measure the groundwater flow direction and velocity as low as order of 1x10 -3 ∼10 -7 cm/sec. (author)

  13. Heightening in efficiency of biological treatment by additives. Tenkazai ni yoru seibutsu shori no koritsuka

    Energy Technology Data Exchange (ETDEWEB)

    Ishikawa, M. (Fukui Institute of Technology, Fukui (Japan))

    1991-11-01

    The activated sludge process and other biological treatments, though utilized for most sewerage and drainage water disposals, often necessitate the maintenance to be managed with a professional knowledge so that confrontation is oftem impossible with trouble in management. In the present report, different basic studies are to be introduced of microbial activation by an addition with saponin. Saponin'', etymologically identical with savon'' and soap'', has been being used as natural cleaner, emulsifier and foamer in South America and Europe since olden times, and is used also for the processed food and potable water in the USA. The present experiment concluded that, in case of using it as microbial activator, the activated sludge can be considerably increased in load quantity of disposal by the heightening in oxygen-supplying power, high concentration microbial maintenance, microbial activation, etc. In the future, there will remain many problems unsolved such as what is the optimized condition for the addition depending upon the condition of base material. 3 refs., 6 figs., 1 tab.

  14. DISCOVERY OF DRAMATIC OPTICAL VARIABILITY IN SDSS J1100+4421: A PECULIAR RADIO-LOUD NARROW-LINE SEYFERT 1 GALAXY?

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, Masaomi [National Astronomical Observatory of Japan, Mitaka, Tokyo 181-8588 (Japan); Morokuma, Tomoki; Doi, Mamoru; Kikuchi, Yuki [Institute of Astronomy, School of Science, University of Tokyo, Mitaka, Tokyo 181-0015 (Japan); Itoh, Ryosuke [Department of Physical Sciences, Hiroshima University, Higashi-Hiroshima, Hiroshima 739-8526 (Japan); Akitaya, Hiroshi; Tanaka, Yasuyuki T.; Kawabata, Koji S. [Hiroshima Astrophysical Science Center, Hiroshima University, Higashi-Hiroshima, Hiroshima 739-8526 (Japan); Tominaga, Nozomu [Department of Physics, Faculty of Science and Engineering, Konan University, Kobe, Hyogo 658-8501 (Japan); Saito, Yoshihiko; Kawai, Nobuyuki [Department of Physics, Tokyo Institute of Technology, Meguro-ku, Tokyo 152-8551 (Japan); Stawarz, Łukasz [Institute of Space and Astronautical Science, JAXA, Sagamihara, Kanagawa 252-5210 (Japan); Gandhi, Poshak [Department of Physics, Durham University, Durham DH1-3LE (United Kingdom); Ali, Gamal; Essam, Ahmad; Hamed, Gamal [National Research Institute of Astronomy and Geophysics, Helwan, Cairo (Egypt); Aoki, Tsutomu [Kiso Observatory, Institute of Astronomy, School of Science, The University of Tokyo, Kiso, Nagano 397-0101 (Japan); Contreras, Carlos; Hsiao, Eric Y. [Carnegie Observatories, Las Campanas Observatory, Colina El Pino, Casilla 601 (Chile); Iwata, Ikuru, E-mail: masaomi.tanaka@nao.ac.jp [Subaru Telescope, National Astronomical Observatory of Japan, Hilo, HI 96720 (United States); and others

    2014-10-01

    We present our discovery of dramatic variability in SDSS J1100+4421 by the high-cadence transient survey Kiso Supernova Survey. The source brightened in the optical by at least a factor of three within about half a day. Spectroscopic observations suggest that this object is likely a narrow-line Seyfert 1 galaxy (NLS1) at z = 0.840, however, with unusually strong narrow emission lines. The estimated black hole mass of ∼10{sup 7} M {sub ☉} implies bolometric nuclear luminosity close to the Eddington limit. SDSS J1100+4421 is also extremely radio-loud, with a radio loudness parameter of R ≅ 4 × 10{sup 2}-3 × 10{sup 3}, which implies the presence of relativistic jets. Rapid and large-amplitude optical variability of the target, reminiscent of that found in a few radio- and γ-ray-loud NLS1s, is therefore produced most likely in a blazar-like core. The 1.4 GHz radio image of the source shows an extended structure with a linear size of about 100 kpc. If SDSS J1100+4421 is a genuine NLS1, as suggested here, this radio structure would then be the largest ever discovered in this type of active galaxies.

  15. Measurement of {sup 14}C time scale of the rings of a tree by accelerator mass spectrometry

    Energy Technology Data Exchange (ETDEWEB)

    Oda, Hirotaka; Furukawa, Michiaki [Nagoya Univ. (Japan). School of Science; Yonenobu, Hitoshi; Ikeda, Akiko; Nakamura, Toshio

    1996-12-01

    {sup 14}C time scale is different from a histrical data in order that it is calculated by assuming that the concentration of {sup 14}C in the sample has not been changed by age. The object of this work is to make clear the errors in measurement of {sup 14}C time scale of the ring of a tree known the tree age. The every year ring of a Hinoki in Kiso, 950 years old, was used as a sample. The most external ring is determined as 1923 years old on the basis of the dendrochronology. The rings after 1120 years were used as the samples. {alpha}-cellulose, the most stable component in the structural components of cell of tree, was prepared from each ring. About 8 mg of {alpha}-cellulose was reduced to graphite to be measured by the tandem thoron analytic meter. The results obtained showed that {sup 14}C time scale was older than that of the histrical data in the twelfth and thirteenth century, but it was more new than that of the histrical data from the late seventeenth to the middle of eighteenth century. The results were agreement with that of Stuiver and Pearson (1933). (S.Y.)

  16. New approach to resolve the amount of Quaternary uplift and associated denudation of the mountain ranges in the Japanese Islands

    Directory of Open Access Journals (Sweden)

    Shigeru Sueoka

    2016-03-01

    Full Text Available Low-temperature thermochronology is a widely used tool for revealing denudation histories of mountain ranges. Although this technique has been applied mainly to continental orogens, such as the European Alps, Himalayas, and Andes, recent technological development of low-temperature thermochronology has made it applicable to a wider variety of mountain ranges with various sizes and tectonic histories. The Japanese Islands comprise young and active island arcs, where an early stage of mountain range formation is observed. Numerous attempts have been made to constrain the uplift and denudation histories of the mountains in the Japanese Islands using geologic, geomorphologic, or geodetic methods. However, the number of thermochronometric attempts has been limited primarily due to the small amount of total denudation since the initiation of the uplift. In this review paper, we introduce the tectonic and geomorphic settings of the mountain ranges in the Japanese Islands, and discuss previous attempts to estimate uplift or denudation of the Japanese mountains using methods other than thermochronology. Furthermore, we discuss problems of the thermochronometric applications in revealing denudation histories of the Japanese mountains. Finally, we present a case study of the Kiso Range in central Japan and discuss the current effectiveness and applicability of low-temperature thermochronology to the Japanese mountainous areas.

  17. Design and construction of Minokawai hydro-power station; Minokawai suiryoku hatsudensho no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, A; Murakami, H; Hatano, K [Kansai Electric Power Co. Inc., Osaka (Japan)

    1994-09-05

    Minokawai power station is a plant with low head and large water quantity (output: 23.4MW) that utilizes Imawatari dam down the Kiso river. In constructing this power station, vertical drilling of about 33m in depth was executed in soft sedimentary rock area with uniaxial compression strength of 100kgf/cm{sup 2} or so. This report describes the geological condition in the drilling area and the outline of design and execution of corresponding landslide preventions. The drilling area mainly consists of tuff-containing sandstone and conglomerate with several weak layers such as lignite layers, and its stratum slopes gently from the mountain side to the river side. When the landslide preventions were designed, it was especially considered to secure stability of the drilling surface of earth filling as well as to control shear deformation along the lignite layer. Based on the two-dimensional elasto-plastic FEM analysis, structural design of landslide prevention walls and reinforcing methods using ground anchors and lock-bolts were determined. Construction works have been proceeded with as the ground behavior has been measured and controlled by setting many instruments such as insertion-type clinometers on the landslide preventions and the back ground. 2 refs., 18 figs., 5 tabs.

  18. Resistivity tomography-basic concepts and its application. Hiteiko tomography no kiso to oyo

    Energy Technology Data Exchange (ETDEWEB)

    Shima, H

    1990-12-31

    In this paper, principles and characteristics of resistivity tomography are outlined, and its application examples are described. Resistivity tomography is a technology to measure electric potential of many electrodes placed on the earth {prime} s surface or in the well and to analyze the resistivity distribution in the objective area. Arrangement of electrodes (current electrodes and potential electrodes) is determined taking account of the sensitivity distribution. Also, measurements need to be done not only between the surface and a borehole and between boreholes, but also along the wall of a borehole. After the measured data are corrected according to the influence of topography, the initial model is revised repeatedly with the Alpha Center method, and then, resistivity distribution maps are obtained. As an example of field application of resistivity tomography, a geological survey using three boreholes at the scheduled construction site for a dam is described. In this survey, distribution conditions of surface soil, gravel, and andesite were confirmed, and the results almost agreed with the results of seismic tomography. Moreover, another survey with resistivity tomography was carried out at the test site of hot dry rock power generation in Yamagata Prefecture. There, conductive solution was injected from the borehole after hydraulic fracturing, and cracking conditions of rocks were investigated. 28 refs., 21 figs., 1 tab.

  19. NOEMA Observations of a Molecular Cloud in the Low-metallicity Galaxy Kiso 5639

    Science.gov (United States)

    Elmegreen, Bruce G.; Herrera, Cinthya; Rubio, Monica; Elmegreen, Debra Meloy; Sánchez Almeida, Jorge; Muñoz-Tuñón, Casiana; Olmo-García, Amanda

    2018-06-01

    A giant star-forming region in a metal-poor dwarf galaxy has been observed in optical lines with the 10 m Gran Telescopio Canarias (GTC) and in the emission line of CO(1–0) with the Northern Extended Millimeter Array (NOEMA) mm-wave interferometer. The metallicity was determined to be 12+{log}({{O}}/{{H}})=7.83+/- 0.09, from which we estimate a conversion factor of α CO ∼ 100 M ⊙ pc‑2(K km s‑1)‑1 and a molecular cloud mass of ∼2.9 × 107 M ⊙. This is an enormous concentration of molecular mass at one end of a small galaxy, suggesting a recent accretion. The molecular cloud properties seem normal: the surface density, 120 M ⊙ pc‑2, is comparable to that of a standard giant molecular cloud; the cloud’s virial ratio of ∼1.8 is in the star formation range; and the gas consumption time, 0.5 Gyr, at the present star formation rate is typical for molecular regions. The low metallicity implies that the cloud has an average visual extinction of only 0.8 mag, which is close to the threshold for molecule formation. With such an extinction threshold, molecular clouds in metal-poor regions should have high surface densities and high internal pressures. If high pressure is associated with the formation of massive clusters, then metal-poor galaxies such as dwarfs in the early universe could have been the hosts of metal-poor globular clusters.

  20. FY 1998 annual report on the project of basic survey for improving energy consumption efficiency in developing countries and programs of international conferences including IPCC. Report on CDM workshop; Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo / IPCC nado kokusai kaigi jigyo (CDM workshop hokokusho) 1998 nendo jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    It is decided in the COP4 that the concrete schemes for the (Kyoto Mechanism) should be boiled down towards the end of 2000. Of the many outstanding issues concerned, those related to the clean development mechanism (CDM) involve a number of problems awaiting solution. In particular, setting the baselines for amounts of the greenhouse effect gas emissions in projects not existing, which are essential for identifying reduced amounts of emissions (or credits), poses serious difficulty because of wide arbitrariness involved in the methodology. Therefore, (standardization) of the procedures is demanded for the accurate identification. In actuality, however, no methodology has been established as to what methods will be possibly applicable to widely diversified types of projects. This workshop, therefore, has focused the discussions on the (baseline problems), expecting to serve as a trigger for the future directions by presenting international researches and promoting the discussions thereon to deepen recognition of these problems, where the AIJ experiences have served as one of the bases. (NEDO)

  1. Relationship between stacking process and resolution; Jugo shori to bunkaino ni kansuru kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Matsushima, J; Rokugawa, S; Kato, Y [Geological Survey of Japan, Tsukuba (Japan); Yokota, T; Miyazaki, T [The University of Tokyo, Tokyo (Japan). Faculty of Engineering

    1996-10-01

    This paper evaluates influences of stacking of incident angles against the reflecting surface on the resolution. Basic equations for evaluating the influences were deduced. A simple evaluation method has been provided using these equations. The present evaluation method is considered to be useful for acquisition design, processing, and interpretation of data as an indicator. According to the equations introduced in this study, there are some demerits for stacking traces whose incident angles were large. A total reflection region often appears due to the decreased resolution, and the vertical resolution decreases prior to stacking. Occasionally, it is not effective to remove traces having large incident angles from the viewpoint of resolution. In practice, the selection of most suitable trace through trial and error is not easy due to difference in individual regions. An evaluation method must be discussed, by which the optimal trace can be selected automatically during the data processing. 6 refs., 15 figs.

  2. FY 1998 annual report on the project of basic survey for improving energy consumption efficiency in developing countries / invitation of engineer trainees from developing countries (Indonesia, the Philippines, Vietnam and Myanmar); Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo / hatten tojokoku gijutsusha shohei jigyo 1998 nendo chosa hokokusho (Indonesia, Philippines, Vietnam, Myanmar)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    NEDO is positively implementing the training programs, in view of importance of training experts on (energy-saving and environmental conservation technologies), by inviting administrators and engineers from developing countries to educate them with Japan's pollution preventive techniques, administration procedures, energy-saving measures, and so on. In FY 1998, NEDO commissioned the International Center for Environment Technology Transfer to train administrators and engineers from Indonesia, the Philippines, Vietnam and Myanmar. This paper describes the proposals, based on the collected answers of the trainees to the questionnaires. The trainees were interested in all themes. About 40% of the trainees considered that the training period was short. Some trainees hoped the training course was held in summer. Difference in industrialization is reflected in difference in recognition and urgency of the environmental problems. Training was conducted by English and Vietnamese, but could be done without translators of Vietnamese. Preparation for the invitation needs a lot of works, and the course should be explained more thoroughly beforehand. It is regrettable that one trainee from Indonesia was late for the course. (NEDO)

  3. Characterization of the Surface Properties of MUSES-C/Hayabusa Spacecraft Target Asteroid 25143 Itokawa (1998 SF36)

    Science.gov (United States)

    Lederer, S. M.; Domingue, D. L.; Vilas, F.; Abe, M.; Farnham, T. L.; Jarvis, K. S.; Lowry, S. C.; Ohba, Y.; Weissman, P. R.; French, L. M.

    2004-01-01

    Several spacecraft missions have recently targeted asteroids to study their morphologies and physical properties (e.g. Galileo, NEAR Shoemaker), and more are planned. MUSES-C is a Japanese mission designed to rendezvous with a near-Earth asteroid (NEA). The MUSES-C spacecraft, Hayabusa, was launched successfully in May 2003. It will rendezvous with its target asteroid in 2005, and return samples to the Earth in 2007. Its target, 25143 Itokawa (1998 SF36), made a close approach to the Earth in 2001. We collected an extensive ground-based database of broadband photometry obtained during this time, which maximized the phase angle coverage, to characterize this target in preparation for the mission. Our project was designed to capitalize on the broadband UBVRI photometric observations taken with a series of telescopes, instrumentation, and observers. Photometry and spectrophotometry of Itokawa were acquired at Lowell, McDonald, Steward, Palomar, Table Mountain and Kiso Observatories. The photometric data sets were combined to calculate Hapke model parameters of the surface material of Itokawa, and examine the solar-corrected broadband color characteristics of the asteroid. Broadband photometry of an object can be used to: (1) determine its colors and thereby contribute to the understanding of its surface composition and taxonomic class, and (2) infer global physical surface properties of the target body. We present both colors from UBVRI observations of the MUSES-C target Itokawa, and physical properties derived by applying a Hapke model to the broadband BVRI photometry.

  4. Measurement of tritium in environment, (2)

    International Nuclear Information System (INIS)

    Chaya, Ikuo; Kagami, Tadaaki; Hamamura, Norikatsu

    1975-01-01

    In order to know the amount of natural tritium in environmental water and also to know the tendency of tritium concentration in surface water which is necessary for the measurement of ground water age, the tritium concentration in rain, river, and sea water in Aichi Prefecture were measured. In order to make the appropriate utilization of ground water such as city water and hot springs and to elucidate the effect of ground water utilization on ground subsidence, it is desirable to clarify the state of underground water-bearing strata, the flow direction and flow speed of ground water, and the change of ground water quality owing to the flow. As the means of knowing the flow speed of ground water, the age determination with tritium was carried out. The amount of tritium was determined by measuring the concentrated samples with a liquid scintillation counter. The tritium concentration in river was 1.7 times as much as that in rain water, and it is attributed to the time difference from raining to flowing in rivers. The tritium concentration in sea water was high at the estuary of Kiso River, and about a half of it in the other places. The water of the hot spring source in Nobi Plain is the old ground water soaked more than 20 years ago. The city water sources utilizing ground water shallower than 300 m use both new and old ground water. (Kako, I.)

  5. Report on projects of the basic survey of effective energy consumption in developing countries and the invitation of engineers of developing countries to Japan (Vietnam, the Philippine, Indonesia and Thailand) in FY 1997; 1997 nendo chosa hokokusho Hatten tojokoku energy shohi koritsuka kiso chosa to jigyo hatten tojokoku gijutsusha shohei jigyo (Vietnam, Philippines, Indonesia Tai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Based on the significance of technological training for energy saving and environmental protection, NEDO has invited administrators and engineers of four countries in Southeast Asia. Pollution prevention technology, administrative methods and energy saving measures in Japan were lectured in the International Center for Environmental Technology Transfer. The training curriculum included (1) basic law of environment and local administration from the viewpoint of criminal law concerning history of air pollution problems and countermeasures in Yokkaichi petroleum industrial complex, (2) prospect of new energy technology development in Japan relating to the energy saving law, (3) energy saving measures, air/exhaust gas/dust treatment for environmental protection, and actual waste treatment measures by typical individual industries, and (4) significance of common management technology for individual treatment measures. Policies of energy saving and environmental protection and technology information in Japan which can be transferred were provided to two administrators of energy saving in the industry sector of Management of Science, Technology and Environment of Vietnam. 12 figs.

  6. Report for fiscal 1999 on the international and fundamental cooperation project for energy consumption efficiency improvement and the international conference project such as IPCC. The meetings of IPCC specialists and IPCC symposiums; 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / IPCC nado kokusai kaigi jigyo. IPCC senmonka kaigo oyobi IPCC symposium hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-10-01

    This paper reports the meetings of specialists and the symposiums by the inter-governmental panels for climate change (IPCC) in fiscal 1999. Three working groups were established for evaluation on climate change from scientific aspects, evaluation on effects and countermeasures from socio-economic aspects, and evaluation on mitigation measures from socio-economic aspects. The working groups have started preparing the third evaluation reports. Common problems are handled in a unified framework as the traversable problems. Specialist meetings are held for several important themes. Especially for the cost problems, preparation of a guidance paper has started, that include the costs and benefits by territories and departments. The themes for the specialist meetings include: cost problems related to effects and countermeasures for climate change and mitigation measures; the IPCC activities for the cost evaluation in the past and an outline of the traversable problems; problems in effects, applicable measures, and mitigation measures; and unification of the cost evaluations. The themes for the symposiums are the frontier line of the climate change problems, and include the outline of IPCC, the current status and issues in the working groups and the special reports for each group. (NEDO)

  7. Point-to-point microwave power transmission experiment; Maikuroha ni yoru denryoku yuso no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Shimokura, N.; Kirihara, T. [Kansai Electric Power Co. Inc., Osaka (Japan)

    1997-09-30

    In order to demonstrate the power transmission using microwave and arrange advantages and problems in the wireless power transmission, field tests of point-to-point power transmission were conducted. Microwave frequency of 2.45 GHz was used, which is assigned as the industrial, scientific and medical frequency. The transmission system is composed of generator, director tube, primary radiator, and transmission antenna. The maximum 5 kW of microwave power can be transmitted by combining a 3 m-diameter parabolic antenna and a magnetron. The receiving system is composed of devices called as RECTENNA (rectifying antenna). A large capacity and high efficiency RECTENNA was developed, by which the maximum 2.5 W of input power per single device can be provided. As a result of the experiments, efficiency at the transmission side was over 70%, and RF-DC efficiency at the receiving side was about 51%. At the open-air test site, however, the total efficiency of only 14.8% could be obtained. 8 refs., 12 figs.

  8. Removal of chemical substances from the atmosphere by photocatalysis; Hikarishokubai ni yoru kiso kagaku busshitsu no jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, K; Kutsuna, S [National Institute for Resources and Environment, Tsukuba (Japan)

    1996-01-25

    Suppression at a source is the principle of suppressing air pollution caused by vapor phase chemical substances. For the case of these substances with extremely low concentrations, discussions were given on decomposition by means of photocatalysts (that utilize solar light) to directly purify them in the atmospheric condition. Catalysis takes place in providing and receiving electrons, that is, oxidation and reduction of the electrons, under light irradiation by using photocatalysts in which light excites and causes internal electrons to migrate freely. Titanium oxide was found effective because it is high in catalytic activity, stable chemically, and harmless. Photodecomposition reaction of chlorinated organic compounds on TiO2 proceeds very fast except for fluorocarbons. In practical use, the catalyst must be fixed so that no catalyst powder will scatter around. Porous TiO2 sheets were, therefore, manufactured using fluorine resin as a binder. The sheets were used to have removed successfully NOx, SO2 and low-grade aldehyde with concentrations from 0.01 to 10 ppm (corresponding to gases discharged from a tunnel). Since the catalyst can function even under solar light, it can remove NOx during daytime, and can be regenerated by precipitation (passive environment purification). The catalyst was verified effective when used on roads in urban areas. 16 refs., 9 figs., 3 tabs.

  9. FY 1996 report on the basic survey project on the enhancement of energy efficiency in developing countries - database construction project. Volume 1. Outline of the survey and collection of the data to be included in database; 1996 nendo hatten tojokoku energy koritsuka kiso chosa jigyo (database kochiku jigyo) hokokusho. 1. Chosa no gaiyo oyobi database ni shurokusuru data no shushu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Following the previous fiscal year, construction/study of database were carried out with the aim of energy conservation for 8 countries: Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan and Korea. In the study of the items of the data included, the 192 data extracted in conceptual design were re-classified into 6 large-groups and 91 medium-groups. As to the data collection, in A group countries, counterparts were requested to collect data, and 1342-1740 data were newly collected. In B group countries, Mitsubishi Research Institute, Inc. mostly collected 957 new data in Thailand, 814 data in Malaysia and 1312 data in Japan in cooperation with research institutes and investigating organizations in each country. In C group countries, 169 and 317 common data items were collected in Vietnam and India, respectively. Relating to plans for database promotion, as a result of the study with each country, 16 measures for promotion were extracted in terms of the leveling-up of NEDO-DB recognition, education of the use method, training of the operation method, etc. (NEDO)

  10. Basic research on the carbon dioxide fixation using seaweed. Kaisorui no tansan gas kotei ni kansuru kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Yamamoto, M.; Ishihara, T. (The Kansai Electric Power Co. Inc., Osaka (Japan))

    1993-08-25

    Study was made for grasping the basic data of CO2 fixation technology by seaweed. The photosynthesis under the sea, which is different from that on the land, is judged to be made by taking in HCO3[sup -] and converting it into CO2 inside the plant. Porphyra yezoensis which is seaweed is cultivated as comestible. With a rise in CO2 content, the growth in length of leaves was observed to be accelerated through ventilating Porphyra yezoensis with the three test types of air which respectively contained 350ppm (atmospheric CO2 content), 1000ppm and 1600ppm CO2. As a result of measuring the photosynthesis speed by the generated quantity of O2, it was heightened with a rise in dissolved inorganic carbonic acid content of the sea water. Measurement was also made of daily fluctuation in calcification speed by Corallina officinalis capable of calcification by ventilating it with 350ppm and 1600ppm CO2. In case of 1600ppm, the sedimentation of CaCO3 was prevented. In case of 350ppm, the sedimentation was quantitatively larger during the bright period than that during the dark period. The growth of Gracilaria gigas which is an agar material was compared by changing the above CO2 levels. In case of 1600ppm, the weight grew to 2.3 times in 20 days. 16 figs., 2 tabs.

  11. Experiment for 3-component S-wave reflection survey. Part 3; Sanseibun S ha hanshaho no kiso jikken. 3

    Energy Technology Data Exchange (ETDEWEB)

    Kano, N; Yamaguchi, K; Yokota, T; Kiguchi, T [Geological Survey of Japan, Tsukuba (Japan)

    1996-10-01

    Anisotropy has been investigated using S-wave as a technique for detecting fractures. In this study, fundamental experiments were carried out with slightly changing the measuring conditions at a place where anisotropy was expected. This paper describes the fundamental data acquisition of anisotropy analysis using S-wave, and a part of the results. The experiments were conducted on the agricultural road in Yamadera district, Matsuyama-machi, Yamagata Prefecture. Two flat unpaved roads meeting at right angles were used as traverse lines. In this place, several reflection surfaces were certainly detected by P-wave, and anisotropy of S-wave was confirmed from the velocity of refracted wave of S-wave. Data were processed for individual traverse lines meeting at right angles. Firstly, signal sweeping, correlation, and vertical superposition were made. Six kinds of data were prepared, i.e., three-component receiving records of data at 0{degree} of generating direction and three-component receiving records of data at 90{degree} of generating direction. Records of T-component at 0{degree} and R-component at 90{degree} were used for processing of the seismic reflection method. These records would be considered to be data of SH-wave and SV-wave, respectively. 4 figs.

  12. Experiment for 3-component S-wave reflection survey. Part 3; Sanseibun S ha hanshaho no kiso jikken. 4

    Energy Technology Data Exchange (ETDEWEB)

    Kano, N; Kiguchi, T; Yamaguchi, K [Geological Survey of Japan, Tsukuba (Japan); Yokota, T [Japan National Oil Corp., Tokyo (Japan). Technology Research Center

    1997-10-22

    Investigations and discussions were given by using P-S logging on anisotropy of refracted waves in the fundamental experiments conducted in the Matsuyama town, Yamagata Prefecture. In the investigations, S-wave was transmitted into two to three directions at four locations in total: one at the opening of a well with a depth of 100 m and three locations having offset of 50 m from the well opening, and anisotropy of direct waves in the depth direction was investigated. Data were recorded on the ground at the same time by using a 3-component receiver. As a result of the experiment, detection of the anisotropy by means of measurement inside the well was found more difficult than anticipated due to anomaly in the refracted waves, hence no clear velocity anisotropy has been observed. It appears that no azimuth anisotropy exists at depths shallower than at least 24 m. No anisotropy due to incident angles was made clear in the present experiment. Offset recording experienced poor S/N ratio, having made the data analysis difficult. The data for zero offset do not harmonize with the refracted wave analysis on the data derived by using the reflection method, whose cause requires further discussions. 4 figs., 2 tabs.

  13. Fundamental characteristics on electric system of solar electric vehicle; Solar car no denki keito ni kansuru kiso tokusei

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, S; Sasaki, M; Kaga, T; Koyama, N [Hachinohe Institute of Technology, Aomori (Japan)

    1996-10-27

    The electric system of a solar vehicle was removed and the fundamental characteristics examined in order to carry out a basic experiment on the electric system. Using a basic circuit with panels, batteries and loads connected, the voltage and current were measured in the presence/absence of the trackers, batteries, etc., and then, their effects were examined. Simultaneously, the quantity of solar radiation was also measured. The lowering of the output voltage was somewhat relaxed with the use of the trackers. Further, with the trackers used, the output voltage of the panel was small in spite of a large quantity of solar radiation compared to the case without the trackers, which was due to the restriction of the output voltage by the trackers. When measured without batteries, the output voltage of the panel was such that the load current was also influenced by the variation of insolation, so that, with a large decrease in insolation, the load current was decreased with the supply of current suspended from the panel. 7 figs., 1 tab.

  14. On the relationship between stacking process and resolution. 2; Jugo shori to bunkaino ni kansuru kiso kenkyu. 2

    Energy Technology Data Exchange (ETDEWEB)

    Matsushima, J; Rokugawa, S; Kato, Y [The University of Tokyo, Tokyo (Japan). Faculty of Engineering; Yokota, T; Miyazaki, M [Geological Survey of Japan, Tsukuba (Japan)

    1997-05-27

    With respect to concept of resolution in seismic exploration using the reflection method, detailed considerations were given on processes of forming the resolution as a result of arranging observation points at vibration transmitting and receiving points. In the discussion, numerical experiments were carried out, in which the scattering stacking process is applied in a model having one scatterer existing in homogeneous media. The experiments investigated an imaging formation process of the scatterer when arrangement of the vibration transmitting and receiving points were changed from a coarse condition to a dense condition while the number of transmitting and receiving points is being increased. Resolution is created if waveforms having finite frequencies are used as input, and the imaging is performed by utilizing the limited number of vibration receiving and transmitting points. If the concept of equi-travel plane is used under these conditions, the equi-travel planes perform negation with each other, and it was indicated that visual resolution is expressed by how good the negating effect is. It was discovered that such concept of the resolution is quite ambiguous in terms of engineerings. 2 refs., 17 figs.

  15. Basic research report on introduction of new energy into Yamaguchi Prefecture; Yamaguchiken shin energy donyu kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In Estimation Work 1, the potentially available amount (the amount in existence) is determined for each type of new energy by use of various new energy related technologies now available. In Estimation Work 2, the available amount is determined for each type of new energy, with social restraint and installation space taken into consideration. Effects upon energy saving and CO2 emission reduction are 4405.2% and 3439.1% in Estimation Work 1, and 6.5% and 8.0% in Estimation Work 2. A conclusion is reached after examining the outcomes of the said estimation works and the results of simulations (conducted on the assumption of new energy introduction in fiscal 2010), the number of advocates expressing their support of new energy adoption in questionnaires answered by various businesses and offices in the prefecture, high possibilities of introduction detected in a survey of exploitation projects of cities, towns, associations, and unions, and the prospect of acceptance by households. The conclusion is that the types of new energy and technologies to be selectively introduced into the prefecture will be photovoltaic power generation, wind power generation, clean energy vehicles, energy extracted from wastes, cogeneration, fuel cells, passive solar system, utilization of waste heat from factories and mills, and ocean energy. These are abundant in terms of potentially available amount and of available amount. (NEDO)

  16. Primary study on quantitative evaluation of driver fatigue; Unten hiro no teiryo hyoka gijutsu ni kansuru kiso kento

    Energy Technology Data Exchange (ETDEWEB)

    Noguchi, Y; Mochizuki, M; Toyofuku, K [Isuzu Advanced Engineering Center, Ltd., Tokyo (Japan); Katsuura, T [Chiba University, Chiba (Japan)

    1997-10-01

    Quantitative evaluation of physical and mental loads are effective in developing more human-friendly vehicles. Here attention has been focused on the mental load. Attempts were made to find some physiological indices that can be used for quantifying the mental load and resultant fatigue. Subjects were told to perform three different tasks in a climatoron, and the relation between physiological indices and their perception of fatigue as well as their capability of performing the tasks were analyzed. As a result, heart rate variability is a good index for quantitative evaluation of mental load and fatigue. 5 refs., 4 figs., 6 tabs.

  17. DETECTION OF REMNANT DUST CLOUD ASSOCIATED WITH THE 2007 OUTBURST OF 17P/HOLMES

    International Nuclear Information System (INIS)

    Ishiguro, Masateru; Kim, Yoonyoung; Kwon, Yuna G.; Sarugaku, Yuki; Kuroda, Daisuke; Maehara, Hiroyuki; Hanayama, Hidekazu; Takahashi, Jun; Terai, Tsuyoshi; Usui, Fumihiko; Vaubaillon, Jeremie J.; Morokuma, Tomoki; Kobayashi, Naoto; Watanabe, Jun-ichi

    2016-01-01

    This article reports a new optical observation of 17P/Holmes one orbital period after the historical outburst event in 2007. We detected not only a common dust tail near the nucleus but also a long narrow structure that extended along the position angle 274.°6 ± 0.°1 beyond the field of view (FOV) of the Kiso Wide Field Camera, i.e., >0.°2 eastward and >2.°0 westward from the nuclear position. The width of the structure decreased westward with increasing distance from the nucleus. We obtained the total cross section of the long extended structure in the FOV, C FOV  = (2.3 ± 0.5) × 10 10 m 2 . From the position angle, morphology, and mass, we concluded that the long narrow structure consists of materials ejected during the 2007 outburst. On the basis of the dynamical behavior of dust grains in the solar radiation field, we estimated that the long narrow structure would be composed of 1 mm–1 cm grains having an ejection velocity of >50 m s −1 . The velocity was more than one order of magnitude faster than that of millimeter–centimeter grains from typical comets around a heliocentric distance r h of 2.5 AU. We considered that sudden sublimation of a large amount of water-ice (≈10 30 mol s −1 ) would be responsible for the high ejection velocity. We finally estimated a total mass of M TOT  = (4–8) × 10 11 kg and a total kinetic energy of E TOT  = (1–6) × 10 15 J for the 2007 outburst ejecta, which are consistent with those of previous studies that were conducted soon after the outburst

  18. Basic survey report on regional new energy vision for Ehime Prefecture; Ehimeken chiiki shin energy vision kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A new energy vision has been formulated to establish guidelines for popularizing and utilizing new energy which generates but a small amount of environmental impact. The results of surveys conducted in this connection are described in five chapters, which cover (1) the trend of new energy, (2) current situation of new energy in Ehime Prefecture, (3) calculation of the existing amount and available amount of new energy, (4) calculation of the introducible amount of new energy, and (5) the basic policy toward the introduction of new energy. Part (4) covers solar energy, wind energy, waste-derived energy, temperature difference energy, minor scale hydroelectric power generation, biomass energy, and like others. It states that a total of 540,000 kl/year will be available in terms of oil, equivalent to approximately 6% of Ehime Prefecture's 1997 energy consumption, and that it is expected that in fiscal 2010 photovoltaic/passive solar energy utilization, cogeneration, and wind power will yield 152,000, 314,000, and 27,000 kl/year respectively. (NEDO)

  19. Report on the FY 1999 basic research on intelligent structure; 1999 nendo kozo chinoka no kiso kenkyu chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A concept of a system is constructed in which a series of the flow from the construction of structures to the shape and control in structural phase, repair, and dismantlement is made effective and controllable by giving a function of intelligent structure to structural systems in aerospace/architecture/civil engineering fields. For it, fundamental technologies required for the systems were extracted for construction of the technology system. Further, in relation to the intelligent machinery system including the control method, manipulation, and communication of the structure under the micro-gravity environment required for this system, the basic experiment was conducted at the ground gravity-free experimental center to acquire the effective data. As to the base technology, three fields were studied of the intelligent machinery system including the behavior/control of materials and structure, intelligent robot, and communication. In the experiment on micro-gravity environment, experiments were carried out on the behavior of micro-gravity rover for small planetary probe, inter-satellite group communication, capture of trouble-satellite, development of inflatable structure, and hopping robot. The valuable data were obtained. (NEDO)

  20. Fiscal 1999 survey report. Data collection, analysis, and investigation for energy efficiency improvement; 1999 nendo energy shohi koritsuka joho shushu bunseki chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With economy growing at a fast pace in the Asia-Pacific region in recent years, demand for energy is sharply increasing in various industries, and the demand is expected to continue to grow. It is afraid that the trend may extend to other developing regions such as East Europe. It is, and will remain to be, important to prevent warming, assure sustained economic development, and secure stable supply of energy on the global scale. The survey in this report aims to grasp the trends of energy efficiency improvement in Asia-Pacific nations, in other developing nations, and in developed nations as well, to ultimately serve the best interests of Japan. For the achievement of the goal, Japan's attitude toward energy conservation promotion activities is expressed at international conferences on energy conservation promotion such as those of APEC (Asia-Pacific Economic Cooperation Conference) in the Asia-Pacific region and of environmental/energy-saving conferences of IEA (International Energy Agency) in Europe and America. On these occasions, information is collected and overseas technical literature is obtained thanks to the established coordination with United Nations-affiliated organizations and key persons in various countries. Data and information thus acquired are utilized for the investigation and analysis of energy conservation technologies and policies adopted and diffused in the respective nations involved. Using them, promotion of energy conservation policies in the Asia-Pacific region and establishment of environmental friendliness are also investigated. (NEDO)

  1. Fiscal 1998 research report on the global environmental assessment for efficient energy consumption; 1998 nendo energy shohi koritsuka chikyu kankyo eikyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    International Panel on Climate Change (IPCC) published the 1st assessment report in 1990 and the 2nd report in 1995 since its establishment in 1988, and is promoting the 3rd research and analysis. Among them, this report describes the study on technology transfer for efficient energy consumption. For stabilizing greenhouse effect gas concentrations in the air, strong control of such gas emission is indispensable, and a role of technology is important for the control. For overcoming some weak points for climate change, practical use of applicable technologies is necessary over a certain period of time, and technology transfer is essential in each country and all over the world. For promotion of such approach, the analysis and evaluation for technology transfer and diffusion are useful in addition to reports on technology itself. Based on such understanding, IPCC has promoted preparation of the special report on methodological and technological issues of technology transfer since 1997. Its approval at the IPCC general meeting is expected in late 1999 or early 2000. Some chapters related to efficient energy consumption are presented. (NEDO)

  2. FY 1999 survey report on the cooperative basic project on the heightening of international energy consumption efficiency. Cooperative survey project in energy conservation/environmental protection fields in developing countries (Indonesia, Myanmar, the Philippines, Thailand and Vietnam); 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo. Hatten tojokoku ni okeru sho energy kankyo hozen bun'ya kyoryoku chosa jigyo (Indonesia, Myanmar, Philippines, Tai, Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As to the pollution preventive administration, clean energy technology, etc. in fields of energy conservation technology, clean energy technology and environment in Japan, administrative officials, researchers and engineers in the fields concerned in Asian countries were invited to Japan for training with the aim of the technology transfer/spread to developing countries. In FY 1999, a total of 15 administrative officials and engineers were invited from Indonesia, Myanmar, the Philippines, Thailand and Vietnam, and had training at International Center for Environmental Technology Transfer. The themes for training are as follows: tackles with energy conservation/environmental protection by the Japanese government administration, pollution preventive measures against automobile gas emissions, pollution preventive measures against industrial gas emissions/waste water, technology for energy conservation, technology for industrial waste disposal, technology for recycling of wastes, etc. Reports were also made public on the situations of the countries participated in the project. Moreover, the field training was made at Yokkaichi complex, Sakakibara wind power plant, Hekinan thermal power plant of the Chubu Electric Power Co., Toyota Motor Corp., etc. (NEDO)

  3. FY 1999 survey report on the cooperative basic project on the heightening of international energy consumption efficiency. Cooperative survey project in energy conservation/environmental protection fields in developing countries (Indonesia, Myanmar, the Philippines, Thailand and Vietnam); 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo. Hatten tojokoku ni okeru sho energy kankyo hozen bun'ya kyoryoku chosa jigyo (Indonesia, Myanmar, Philippines, Tai, Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As to the pollution preventive administration, clean energy technology, etc. in fields of energy conservation technology, clean energy technology and environment in Japan, administrative officials, researchers and engineers in the fields concerned in Asian countries were invited to Japan for training with the aim of the technology transfer/spread to developing countries. In FY 1999, a total of 15 administrative officials and engineers were invited from Indonesia, Myanmar, the Philippines, Thailand and Vietnam, and had training at International Center for Environmental Technology Transfer. The themes for training are as follows: tackles with energy conservation/environmental protection by the Japanese government administration, pollution preventive measures against automobile gas emissions, pollution preventive measures against industrial gas emissions/waste water, technology for energy conservation, technology for industrial waste disposal, technology for recycling of wastes, etc. Reports were also made public on the situations of the countries participated in the project. Moreover, the field training was made at Yokkaichi complex, Sakakibara wind power plant, Hekinan thermal power plant of the Chubu Electric Power Co., Toyota Motor Corp., etc. (NEDO)

  4. Fiscal 1999 survey report. Survey of effect of energy efficiency improvement on global environment; 1999 nendo energy shohi koritsuka chikyu kankyo eikyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Analyses are conducted into consideration given to global warming measures in the 3rd assessment report of the Intergovernmental Panel on Climate Change (IPCC) and into technology transfer from developed nations to developing nations in the Asia-Pacific region etc. to contribute to their energy efficiency improvement. The aim is to present data for deliberation as to how future energy efficiency improvement measures should be in the Asia-Pacific region. The chapters (Chapter 0 through Chapter 10) of the report to be worked out by Working Group III deeply involved in energy problems are 0) Introduction, 1) Scope of the report; 2) Socio-economic and emissions scenarios; 3) Technical and economic potential of GHG (greenhouse gas) emissions reduction; 4) Technical and economic potential of biological CO2 mitigation options; 5) Barriers, opportunities and market potential of technologies and practices; 6) Policies, measures and instruments; 7) Costing methodologies; 8) Global, regional and national costs and ancillary benefits of mitigation; 9) Sector costs and ancillary benefits of mitigation; and 10) Decision making frameworks. As the result of the survey, some actual technology transfer implementations are introduced covering branches closely related to energy efficiency improvement, which are branches of construction, traffic, industry, energy supply, and wastes. (NEDO)

  5. FY 2000 report on information exchanges/analytical survey for improvement of energy consumption efficiency; 2000 nendo energy shohi koritsuka joho kokan bunseki chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of surveying the situation of the arrangement of methods of energy conservation promotion and the emissions trading system in developing countries by Japan having the effectiveness or in cooperation with developed countries, information was collected through the participation in international conferences related to energy conservation promotion, etc. and by visits at governmental organizations in charge in developed countries and developing countries. The results of the survey were classified into the following four items: 1) survey method; 2) exchanges of information on energy conservation in main 3 developing counties; 3) exchanges of information of energy conservation in the main developed countries; 4) exchanges of information of the emissions trading system (international trading system of energy conservation values (greenhouse effect gas emission right)). In 4), survey was made on the following: the emissions trading system for the inside of company group (BP-Amoco), the details of the emissions trading system for one country (the U.K.), the grapple with the emissions trading by a private trading organization (NATSOURCE Co.), and the handle with the emissions trading system by each of the OECD countries. (NEDO)

  6. FY1995 report on the novel methods for magnetic resonance imaging; 1995 nendo senshin MRI gazoka shuho no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The purpose of this project is to develop new 2-dimensional ultrafast MRI (Magnetic Resonance Imaging) methods for the Image Guided Cancer Therapy (IGT) and the non-invasive clinical diagnosis. We have developed two MRI methods. They can reconstruct a two dimensional image by only a RF excitation and slow changing of gradient fields. This paper describes theoretically how to apply the RF wave and the gradient in x, y and z direction, respectively. Echo signals are acquired under multi-frequency resonance. The frequency bandwidth of the RF wave adjusts the field of view (FOV) of the imaging plane. Biological effects of the applied RF wave was evaluated by the brain microdialysis. In animal experiments, these was not significant change of neurotransmitters subject to the RF wave. From these theoretical and experimental results, these MRI methods are applicable to IGT and the clinical diagnosis for the cancer and other diseases. (NEDO)

  7. FY 1995 research for optical diagnosis by contrast agent; 1995 nendo hikari toresa wo riyoshita atarashii bunko shindanhono kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    For expanding the optical diagnosis to clinical medicine, we tried to use the several optical characteristics of living tissues in addition to absorption measurements of blood. The scattering and luminescence of the tissue were examined in detail. The final goal of the research is to introduce the contrast agent active in the near-infrared region. (1) We have succeeded in obtaining the scattering and absorption coefficients separately from the time-resolved data of living tissues such as rat head and even human head. Then, based on the basic equations derived from our experiments, the quantification of the absolute absorbance was performed. (2) Using the near-infrared fluorescent dye, Rhodanine 800, we could monitor the energy state of tissues. We concluded that Rhodamine 800 is the possible candidate for energy-reporting contrast agent applicable to near-infrared spectrophatometry. (NEDO)

  8. DETECTION OF REMNANT DUST CLOUD ASSOCIATED WITH THE 2007 OUTBURST OF 17P/HOLMES

    Energy Technology Data Exchange (ETDEWEB)

    Ishiguro, Masateru; Kim, Yoonyoung; Kwon, Yuna G. [Department of Physics and Astronomy, Seoul National University, Gwanak, Seoul 151-742 (Korea, Republic of); Sarugaku, Yuki [Kiso Observatory, Institute of Astronomy, Graduate School of Science, The University of Tokyo, Mitake, Kiso-machi, Kiso, Nagano 397-0101 (Japan); Kuroda, Daisuke; Maehara, Hiroyuki [Okayama Astrophysical Observatory, National Astronomical Observatory of Japan, Asakuchi, Okayama 719-0232 (Japan); Hanayama, Hidekazu [Ishigakijima Astronomical Observatory, National Astronomical Observatory of Japan, 1024-1 Arakawa, Ishigaki, Okinawa 907-0024 (Japan); Takahashi, Jun [Nishi-Harima Astronomical Observatory, Center for Astronomy, University of Hyogo, Sayo, Hyogo 679-5313 (Japan); Terai, Tsuyoshi [Subaru Telescope, National Astronomical Observatory of Japan, Hilo, HI 96720 (United States); Usui, Fumihiko [Department of Astronomy, Graduate School of Science, The University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo 113-0033 (Japan); Vaubaillon, Jeremie J. [Observatoire de Paris, I.M.C.C.E., Denfert Rochereau, Bat. A., F-75014 Paris (France); Morokuma, Tomoki; Kobayashi, Naoto [Institute of Astronomy, Graduate School of Science, The University of Tokyo, 2-21-1 Osawa, Mitaka, Tokyo 181-0015 (Japan); Watanabe, Jun-ichi [National Astronomical Observatory of Japan, Mitaka, Tokyo 181-8588 (Japan)

    2016-01-20

    This article reports a new optical observation of 17P/Holmes one orbital period after the historical outburst event in 2007. We detected not only a common dust tail near the nucleus but also a long narrow structure that extended along the position angle 274.°6 ± 0.°1 beyond the field of view (FOV) of the Kiso Wide Field Camera, i.e., >0.°2 eastward and >2.°0 westward from the nuclear position. The width of the structure decreased westward with increasing distance from the nucleus. We obtained the total cross section of the long extended structure in the FOV, C{sub FOV} = (2.3 ± 0.5) × 10{sup 10} m{sup 2}. From the position angle, morphology, and mass, we concluded that the long narrow structure consists of materials ejected during the 2007 outburst. On the basis of the dynamical behavior of dust grains in the solar radiation field, we estimated that the long narrow structure would be composed of 1 mm–1 cm grains having an ejection velocity of >50 m s{sup −1}. The velocity was more than one order of magnitude faster than that of millimeter–centimeter grains from typical comets around a heliocentric distance r{sub h} of 2.5 AU. We considered that sudden sublimation of a large amount of water-ice (≈10{sup 30} mol s{sup −1}) would be responsible for the high ejection velocity. We finally estimated a total mass of M{sub TOT} = (4–8) × 10{sup 11} kg and a total kinetic energy of E{sub TOT} = (1–6) × 10{sup 15} J for the 2007 outburst ejecta, which are consistent with those of previous studies that were conducted soon after the outburst.

  9. Fiscal 2000 survey report. Basic research on dissimilar metal welding technology; 2000 nendo izai yosetsu gijutsu no kiso kenkyu chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Basic data for the above subject were collected through technical research on the melt welding of dissimilar metals and through conducting experiments under microgravity concerning the phenomenon of melt welding. The technical research covered reports published in the past 25 years on the welding or bonding of dissimilar materials. For each of the combinations of dissimilar materials of steel, nonferrous metal, and ceramics for producing a transitional joint, investigations were conducted as to whether dissimilar metal welding or bonding was currently feasible under each of the welding or bonding methods, and problems were extracted and remedies were gathered. No melt welding technology was found, however, capable of directly welding dissimilar materials for a transitional joint in which intermetallic compounds were to be formed. In a melt welding experiment conducted under microgravity, investigations were conducted into the effect of surface tension and gravity on convection inside a molten pool and into the bonding of dissimilar materials for which Al/Cu and Al/Mg were involved. It was then shown that microgravity is effective in mitigating stirring and segregation in a molten pool. (NEDO)

  10. FY 1999 basic survey of coal resource development. Coal GIS survey; 1999 nendo sekitan shigen kaihatsu kiso chosa. Sekitan GIS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The purpose of this survey is to construct a comprehensive coal field assessment technology system which can promptly cope with any natural conditions/geological situations of coal field. As to the GIS (geographical information system) which can unifiedly manage/analyze various data being used in other fields, survey was conducted of present situations/technology trends of the resource related GIS, and at the same time the survey is aimed at applying it to the coal resource field. In the survey in this fiscal year, based on the survey made in FY 1998, applicability of GIS function was verified for Australia where the coal GIS is prepared. And the fundamental design was made to construct a coal GIS considered of concrete application in the stage of coal resource exploration and resource assessment. In the fundamental design, prototypes of individual functions of the system were made. Making the analysis using the actual data, expansion and complication of the system size were advanced step by step toward the completion of the system. Such prototypical development method was adopted. (NEDO)

  11. Fiscal 1998 research report (continued from the fiscal 1997 project). International survey project for rational energy use / Basic survey on efficient energy use in developing countries (Database construction project) / Survey on Japanese energy conservation technologies; 1998 nendo (1997 nendo jigyo kurikoshi) kokusai energy shiyo gorika nado chosa jigyo hatten tojokoku energy shohi koritsuka kiso chosa (database kochiku jigyo) chosa hokokusho. Nippon no sho energy gijutsu ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    As a part of development of the energy conservation technology database, revision was made on 'Directory of Energy Conservation Technology in Japan' which was published to present the energy conservation technology of the Japanese energy-intensive industry to Asian countries in fiscal 1996. The previous directory was composed of 307 technical items, and 126 items among them were deleted and new 63 items were added through this revision. The technologies with energy conservation effects more than 10% were mainly selected by knowledge of the industrial members of the committee and other specialists. The energy conservation effect widely ranges from low-level one to high-level one, and the number of all the energy conservation technologies is enormous. Consequently, it should be considered that the applicable extent of the energy conservation technologies is dependent on the energy cost or economical situation of Japan and developing countries. (NEDO)

  12. Basic survey for coal resources exploitation for Fiscal 1998. Coal GIS survey; 1998 nendo seitan shigeh kaihatsu kiso chosa. Sekitan GIS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the construction of a coal mine assessment technology system, surveys are conducted on the current state and technology trends of resources-related GIS (geographical information system) in other countries. When one ponders over coal-rich areas to be newly explored and developed in one's study on the stable exploitation of coal abroad and its import to this country, what interests one gradually shifts from known superior large-scale coal mine areas to next-generation coal mine areas yet to be exploited. Accordingly, it is mandatory to build an assessment-oriented comprehensive technology system capable of promptly dealing with any changes in natural, geological conditions that may be presented by coal mines to be exploited. Although GIS is recognized as a useful means not only in the field of natural science but also in other fields whose data may be plotted on a map, its position is not yet established when it comes to coal resources. It is therefore necessary to promptly introduce GIS into the field of coal. In fiscal 1998, on-site surveys were conducted not only in Japan but also in the U.S., Canada, and Australia who are senior to Japan in terms of GIS application. Also, information was collected from literature and via Internet, surveys were conducted about the use of GIS in the field of earth science especially in the field of coal resources, and the state of the digital data utilizing setup indispensable for the proper operation of GIS was investigated. (NEDO)

  13. Fundamental analysis of thermally regenerative fuel cell utilizing solar heat; Taiyonetsu wo riyosuru netsu saiseigata nenryo denchi no kiso tokusei no kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    Ando, Y; Tanaka, T; Takashima, T; Doi, T [Electrotechnical Laboratory, Tsukuba (Japan); Aosawa, T; Kogoshi, S [Science University of Tokyo, Tokyo (Japan)

    1997-11-25

    Study was made on a thermally regenerative fuel cell using solar heat. The thermally regenerative fuel cell was devised which is composed of 2-propanol liquid-phase endothermic dehydrogenation at nearly 100degC, and acetone liquid- phase exothermic hydrogenation at nearly 30degC as reverse reaction. This low-temperature dehydrogenation can relatively easily utilize a flat solar heat concentrator. 2-propanol dehydrogenation generates acetone and hydrogen. Generated acetone generates electric power in hydrogenation, generating propanol. This propanol regenerates acetone and hydrogen in dehydrogenation. The activity of Ru and Pt composite catalyst was considerably higher than that of Ru or Pt single catalyst. The activity was also higher in carbon felt or carbon cloth carrier than carbon plate carrier. The open circuit voltage of the fuel cell was estimated to be 110-120mV, nearly consisting with theoretical values. Short circuit current was also estimated to be 9-11mA, suggesting reduction of its internal resistance as an important subject. 4 refs., 5 figs., 2 tabs.

  14. Basic studies on application of vegetable factory in Tohoku region; Tohoku chiho ni okeru yasai kojo no jitsuyoka ni kansuru kiso kento

    Energy Technology Data Exchange (ETDEWEB)

    Okano, T; Terazoe, H; Shoji, K; Nakaya, K [Central Research Institute of Electric Power Industry, Tokyo (Japan); Tanaka, M; Miura, K [Tohoku Electric Power Co. Inc., Sendai (Japan)

    1995-08-01

    To construct vegetable factories in the Touhoku region, items of information have been collected with respect to items to be cultured and market conditions. Experimental discussions have also been given on new culture items and methods for utilizing snow. Using the results of investigations on the market conditions and weather environments, the following three kinds of spicy vegetables were selected: water cress which grows in about 46 culture days after seeding and in about 36 days by herbaceous cutting to a harvest of about 700 g/m{sup 2}, green perilla which grows in about 85 culture days to a number of salable leaves of 100 per stock, with an average leaf area of about 55 cm{sup 2}, and trefoil which grows in about 56 culture days to a harvest of about 5100 g/m{sup 2}. According to a storage experiment using snow, lettuce packed with snow in a box retained at a temperature of 5{degree}C and a humidity of 100%, pre-cooled for one day and then stored for six days in a refrigerator at 5{degree}C presented very little decrease in fresh weight and no decrease in freshness. The same result was obtained also for the Sunny Lettuce. 9 refs., 19 figs., 9 tabs.

  15. Study of hydrocarbon emission in small direct injection engines; Kogata DI diesel kikan ni okeru teifukaji HC haishutsu ni kansuru kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Tsurushima, T; Zhang, L; Ueda, T; Fujino, R; Yokota, K [Isuzu Advanced Engineering Center, Tokyo (Japan)

    1997-10-01

    The cause of unburned hydrocarbon emission in small DI diesel engines at light load was studied. An optically accessible engine which was enabled to visualize the squish area was used to investigate the behavior of spray, mixture distribution and so on. Based on these observations and engine tests, the factors such as the direct impingement of liquid phase fuel spray to the combustion chamber wall the unevenness of fuel spray among holes and spreading of the fuel droplets, mixture and flame to the squish area were supposed to be the cause of forming HC emission. 18 refs., 10 figs., 2 tabs.

  16. Research report of fiscal 1997. Basic research on joint implementation for preventing global climate changes; 1998 nendo chosa hokokusho. Kyodo jisshi kiso chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Research was made to promote Activities Implemented Jointly Japan Program. Joint Implementation (JI) is the methodology for preventing global climate changes by collaboration of countries. The countries take cooperative actions for reduction, absorption and fixation of greenhouse gases, and effectively distribute the reduction credits among relevant parties. This was decided in the first session of the Conference of Parties (COP) held in March, 1995. In COP3, Japan`s assigned reduction amount in 2008-2012 was determined as 6% of the emission level in 1990. The protocol defines JI between parties as dealings of emission reduction units, and JI between developing countries as clean development mechanism. The rules for a base line and credit distribution are necessary before full-scale implementation. Although JI is regarded as an important cost-effective project, it is important to decide where and how the JI projects should been promoted. The present state and issues of the primary approved project of Japan Program are arranged. In particular, various terms related to developing countries remain to be solved. 21 figs., 32 tabs.

  17. Basic study of CO2 fixation using a combination of seaweed and shells; Kaiso to kairui wo kumiawaseta CO2 koteika kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, H. [Kansai Electric Power Co. Inc., Osaka (Japan)

    1997-09-10

    CO2 fixed in organic matters return to the atmosphere after putrefication and decomposition, but it is also known that CO2 fixed in inorganic shells stays there permanently. A study is made in this report about the fixation of CO2 in organic matters by use of the ulva and anchored diatom known to be high in CO2 trapping capability, and the study also covers the raising of shells aiming at the fixation of CO2 in inorganic matters. The ulva is raised in a cylindrical raceway type culture water tank, and the anchored diatom in a cylindrical culture unit, and breeding conditions under which they multiply at the highest rate are determined. Their CO2 fixation rates are, respectively, 92.76mg/liter/day and 25.45mg/liter/day, which may be converted, respectively, into 147.1 ton and 5.8 ton of CO2 per hectare per year. Fixed CO2 amounts are tentatively calculated using the above-said figures combined with the raising of shells, and it is found that CO2 may be effectively fixed when the ulva is raised in a 1-hectare area and the shells in a 3.63-hectare area. In this case, the annual CO2 fixation amounts are estimated at 74.1 ton in inorganic matters and 3.9 ton in organic matters. 6 figs.

  18. FY 2000 report on the analytical survey of the basic data by area; 2000 nendo chosa hokoku. Chiiki betsu kiso data bunseki chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    From a viewpoint of the spread of energy conservation technology, etc. that Japan owns, following the previous fiscal year, data collection/study were made of 51 countries and 1 area including 49 countries (17 Asian developing countries, 13 Middle East countries and 19 countries in East Europe/Former U.S.S.R.) and 2 countries (Japan/the U.S.) and 1 area (the EU) that were added for comparison with developed countries. Items for study were the general situation, economic/trade indicators, administration/general situation, energy situation, economic/technical cooperation from Japan, implementing situation of NEDO's model project, AIJ implementing situation in each country, etc. To keep the continuity, data were numerically obtained from the same data source as that used in the previous fiscal year as a rule. The input data were made as consistent in each item as possible, and the same table was obtained from a single data source as a rule. The data in the previous fiscal year were reviewed, and the data were adopted from which data on as many countries as possible could be acquired through the same data source. (NEDO)

  19. FY 2000 report on the analytical survey of the basic data by area; 2000 nendo chosa hokoku. Chiiki betsu kiso data bunseki chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    From a viewpoint of the spread of energy conservation technology, etc. that Japan owns, following the previous fiscal year, data collection/study were made of 51 countries and 1 area including 49 countries (17 Asian developing countries, 13 Middle East countries and 19 countries in East Europe/Former U.S.S.R.) and 2 countries (Japan/the U.S.) and 1 area (the EU) that were added for comparison with developed countries. Items for study were the general situation, economic/trade indicators, administration/general situation, energy situation, economic/technical cooperation from Japan, implementing situation of NEDO's model project, AIJ implementing situation in each country, etc. To keep the continuity, data were numerically obtained from the same data source as that used in the previous fiscal year as a rule. The input data were made as consistent in each item as possible, and the same table was obtained from a single data source as a rule. The data in the previous fiscal year were reviewed, and the data were adopted from which data on as many countries as possible could be acquired through the same data source. (NEDO)

  20. Lateral loading test of full-scaled pile foundation focused on ultimate behavior; Shukyoku kyodo ni chakumokushita jitsubutsudai kui kiso no suihei saika shiken

    Energy Technology Data Exchange (ETDEWEB)

    Kosa, K. [Hanshin Expressway Public Corp., Osaka (Japan); Suzuki, N. [CTI Engineering Co. Ltd., Tokyo (Japan); Kimura, M. [Kyoto University, Kyoto (Japan); Kimura, Y. [Public Works Research Institute, Tsukuba (Japan); Morita, Y. [Kiso-Jiban Consultants Co. Ltd., Tokyo (Japan)

    1998-06-21

    Lateral loading test of full-scaled pile foundation was made up to the ultimate limit state to establish a limit state design method for pile foundations. A full-scaled 3-by-3 pile group driven as bridge foundation was used for the test. A surface reclaimed layer is nearly 13cm in thickness. The lateral unidirectional loading test was repeatedly carried out by using 6 hydraulic jacks at 30MN in maximum load capacity and 50cm in maximum allowable deformation. The test and analysis results are as follows. In a range of 0-40% in pile head displacement/pile diameter ratio, a load-carrying capacity increased gradually. The yield point of a load-displacement curve agreed with the point at which a reinforcing bar of a pile body reaches analytical yield stress. Bending moment of a pile body and shear stress of a pile head increased in the order of back, middle and front rows. It was confirmed that a framework analysis method considering the non-linearity of a pile body and bedrock is also applicable to full-scaled pile group foundations. 17 refs., 32 figs., 3 tabs.

  1. Basic research on the development of 'intelligent-type' humidity control materials; Intelligent gata choshitsu zairyo no kaihatsu ni kansuru kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Tomura, S.; Maeda, M.; Inukai, K.; Ohashi, F.; Suzuki, M.; Suzuki, K.; Shibasaki, Y. [National Industrial Research Institute of Nagoya,Nagoya (Japan)

    2000-10-25

    The water vapor adsorption desorption isotherms of purified and/or synthesized sepiolite, allophane, diatomite, selectively leached kaolin and mesoporous silica were measured to develop humidity control materials in living environments. Based on Kelvin's capillary condensation theory, suitable pore diameters for controlling relative humidity at 40 and 70% were calculated to be 3.2 and 7.4 nm, respectively. Wakkanai diatomite, purified allophane, selectively leached kaolin and mesoporous silica have suitable pore diameters and high water adsorptivity, and were considered as candidates for humidity self-control materials. Among these materials, mesoporous silica formed as a tile showed the best performance as a humidity control material in desiccator and model house levels. (author)

  2. FY 2000 report on the survey of effects of enhancement of energy consumption efficiency on the global environment; 2000 nendo energy shohi koritsuka chikyu kankyo eikyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Looking for effective measures for enhancement of energy consumption efficiency in the Asia Pacific region, survey was made of the state of study of measures against global warming in the 3rd IPCC report and the state of study of the incidental convenience. The survey was made in the following two fields: 1) research analysis in study of the 3rd IPCC report; 2) research analysis of the convenience incidental to measures against global warming. 1) is composed of IPCC activities and the 3rd assessment report, and the developmental state of global warming prevention technology and potential of greenhouse effect gas reduction. Subjects on the prevention technology are the technology for enhancement of energy consumption and development of non-fossil fuels. Physical/chemical CO2 fixation is also studied. 2) is composed of the introduction, economic/social/environmental effects, international flow, reasons for different conclusion in every study, and fields of further study. Considered were global warming prevention measures, for example, economic/social/environmental effects of creation of the carbon tax, reduction in subsidy in energy sector, etc. (NEDO)

  3. Development of more effective methods of normalization and application at braking in turn test; Senkai seido shiken no koritsuka to oyo han`i no kakucho shuho no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Sekine, T; Nagae, H [Nihon University, Tokyo (Japan)

    1997-10-01

    Recant passenger cars have so higher grades of the cornering performance that the vehicle behaviors at braking in turn have become more important for the security on the obstacle avoidance ability. In this paper, the influences of amount of initial centripetal acceleration to braking motion of vehicles are discussed by experimental and theoretical analysis. Under the higher centripetal accelerations, even smaller deceleration bring the vehicle oscillating yaw velocity phenomena as same as centripetal accelerations. As to advance the effective test procedure. the authors proposed one of the methods that enable to reduce the test error by insufficient vehicle velocity. 7 refs., 6 figs., 1 tab.

  4. FY 1997 report on the field survey on country situations including efficient energy consumption. Vietnam; 1997 nendo chosa hokokusho (energy shohi koritsuka nado chiiki josei genchi chosa). Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Field survey was made on the current state of and issues on energy in Vietnam. In Vietnam, firewood is in wide use as non-commercial energy, and sums to a half of total energy consumption. Other energies such as hydroelectric power, petroleum, natural gas and coal are self-sustainable. Commercial energy consumption in 1995 is estimated at 10,070,000t in oil equivalent, which is broken down into 23% for coal, 42% in oil, 5% for natural gas and 30% for electricity. Abundant water resources will form the mainstay of future electric power supply. Commercial production of oil started in 1986 becoming an oil exporting country. Several promising natural gas fields were discovered as the result of the exploration by foreign capital. Coal deposits are estimated to be nearly 3.5 billion tons, and most of them are anthracite. Electric power demand is growing at a higher rate than the economic growth of Vietnam. The growth rate of electric power demand is set to be 1.3 times that of GDP. Since construction funds for new plants cannot be satisfied with the national budget and domestic investment alone, the country is expecting foreign capitals. 21 figs., 36 tabs.

  5. Fiscal 1999 technical survey report. Basic survey of prioritized fields in Central Asia; 1999 nendo Chuo Asia chiiki juten bun'ya kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in four countries in Central Asia (Kazakhstan, Uzbekistan, Turkmenistan, and Azerbaijan), basic surveys were conducted into their energy policies, trends of supply and demand, electric power industry, metal refining industry, and cement making industry. Common to the four nations were that they were rich in energy resources (natural gas, oil, and coal) but that they failed to utilize them effectively despite of an increase in the yields. Incomplete infrastructures and delay in the implementation of energy measures attracted attention. A higher priority was found attached to the upgrading of and investment in structures, renewal of facilities, and the intensification of management. The basic industries wanted the modernization of their facilities and processes. As for electric power consumption, Kazakhstan consumed 53.0-billion kWh, Uzbekistan 39.0-billion kWh, Turkmenistan 4.4-billion kWh, and Azerbaijan 16.4-billion kWh. In Uzbekistan, where the nonferrous metal refining industry led its national economy, the energy consumption rate was found to be quite high. There was a decrease in production in the cement making industry. (NEDO)

  6. Report for fiscal 1981 of Sunshine Program coal group. Basic research on Solvolysis liquefaction technology; 1981 nendo solvolysis ekika gijutsu no kiso kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Basic research is conducted on the Solvolysis liquefaction process for the purpose of producing from coal an ashless, low-sulfur, pollution-free liquid fuel. In the research on the Solvolysis liquefaction (1st stage liquefaction) of coal using a hydrogenation solvent, the Solvolysis liquefaction of coal is studied, for which a refined Solvolysis pitch containing coal substances and a hydride of solvent refined coal are used as Solvolysis liquefaction solvents for the 1st stage. In the research on the 1st stage liquefaction reaction conditions using a high-temperature closed process, two methods are employed. One is a method that uses a mini-pump type reactor in which a small hermetic container is submerged in a high-temperature solvent for rapid heating and the other is a method that uses a pipe type reactor in which coal slurry is caused to travel through a pipe heated to a high temperature. For the analysis of the 2nd stage liquefaction (hydrogenation) reaction conditions, the properties of the 2nd coal liquid, and the constitution of the 2nd coal liquid, and the for the research on the 1st stage liquefaction capacity, the hydrogenation of anthracene oil and solvent refined coal as recyclable solvent models is studied. (NEDO)

  7. Fiscal 2000 survey report. Basic research on hot molding of amorphous ceramics; 2000 nendo amorphous netsukan ceramics seikeiho ni kansuru kiso kenkyu chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Experiments were conducted on the plasticity processing of heat resistant ceramics making use of the viscous deformation of amorphous ceramics in the supercooled liquid temperature domain. Concerning the preparation of powder of amorphous ceramics, the plasma rotating electrode method of Institute for Materials Research, Tohoku University, was employed, and a bamboo leaf shaped amorphous flake was successfully fabricated by increasing the arc discharge current. In a search of texture easy to turn amorphous, it was observed that Al{sub 2}O{sub 3}-La{sub 2}O{sub 3} had a supercooled liquid domain of as large as 70K, and this enabled a conclusion that it was a promising candidate for hot molding in a supercooled liquid domain. In an experiment of molding in a supercooled liquid domain, Al{sub 2}O{sub 3}-Gd{sub 2}O{sub 3} was used in a press molding process. As the result, a compact bulk mold was obtained in a temperature domain far lower than in the case of conventional sintering. Crystallization had already advanced in all the molds experimentally fabricated by press molding, and this disabled a study of characteristics to be exhibited by an amorphous mold, but it was found that they had a compressive strength of approximately 1,800MPa. (NEDO)

  8. Research on effective botanical production technology. Method established for the qualitative evaluation of hydroponically cultivated teat; Shokubutsu seisan gijutsu no koritsuka kenkyu. Suiko saibaicha no hinshitsu hyokaho no kakuritsu

    Energy Technology Data Exchange (ETDEWEB)

    Ota, T; Harada, K [Hokkaido Electric Power Co. Inc., Sapporo (Japan)

    1995-06-14

    In case of cultivation on the ground, the tea is produced about five years after the transplantation. In case of hydroponic cultivation, however, it can start in about two years. Against difficulties due to the high temperature in summer, the cool summer climate of Hokkaido is good for putting the hydroponic cultivation to practical use. As the tea is a nonessential grocery item, its quality is regarded as very important, and determined by its theanine and other free amino acid content. Therefore, a new measurement method by high-speed liquid chromatography was studied to establish the method of quantitatively analyzing the free amino acid. By applying this method established, the hydroponically cultivated tea was qualitatively evaluated through classifying it and measuring its free amino acid content at each of its foliage heights. The main free amino acid contained was known to be theanine, glutamine, arginine, threonine and alamine. The theanine accounted for about 70% of all the free amino acid, and with a decrease in foliage height, its content fell. 15 refs., 20 figs., 2 tabs.

  9. Fiscal 1997 report on the survey of effects of enhancement of energy consumption efficiency on the global environment; 1997 nendo chosa hokokusho (energy shohi koritsuka chikyu kankyo eikyo chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper surveyed the state of studying the measures against global warming in the third assessment report of the Intergovernmental Panel on Climate Change (IPCC) and made analyses of the trends of preventive measures for global warming in other countries, aiming at presenting data for studying the future enhancement of energy consumption efficiency in the Asia Pacific region. In the U.S., a report was taken up from Executive Office of the President which is entitled `the federal government R and D of energy for solution to problems in the 21st century.` The report made analyses of the federal government R and D of energy and at the same time recommended an increase in R and D budget and reinforcement of the organization of the Department of Energy. In Europe, the carbon tax, CO2 tax, energy tax, etc. are introduced or studied for reduction of CO2 emissions. OECD made public a report approved in May 1997 which is entitled `the environmental tax and green tax reform.` Also studied were the introduction and effects of the carbon tax aiming at reducing CO2 emissions in developing countries. More attention is being paid to economic effects predicted in case developed countries reinforce various kinds of measures for targeted reduction of greenhouse gases. 2 figs., 4 tabs.

  10. Basic survey on the residence using hybrid energy in snowy cold regions; Sekisetsu kanreichi ni okeru hybrid energy katsuyogata jutaku nado ni kansuru kiso chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The conceptual model and feasibility of the hybrid energy system for residences and public facilities in snowy cold regions were studied. Based on the existing data, the existing and available amounts of natural energy and unused energy in the target area, Sapporo were estimated. Based on the predicted energy demands of 4 kinds of building models, the energy systems for such models were studied. The use of the following energies was considered: photovoltaic power generation and solar heat for all the models, household sewage energy for the multiple-dwelling house model, and wind power generation for the public facility model. The annual energy balance was calculated to evaluate it. The use of additional commercial electricity was necessary, while surplus solar heat energy was found in summer which can push up the self-sufficiency rates of the residence and public facility models to 70% and 44%, respectively. The multiple- dwelling house model which can use a large amount of household sewage energy could utilize 80% of new energy, while the other 3 models utilized only 60-70% of that. 81 figs., 42 tabs.

  11. Fiscal 1999 survey report. Basic survey on practical application of innovative energy technologies; 1999 nendo kakushinteki energy gijutsu no jitsuyoka ni kansuru kiso chosa. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This survey aims to verify whether recoverable energies can bear the important role of energy source in place of fossil fuels, to probe into problems that may arise in the process of recoverable energy introduction, and to compile suggestions about measures toward their smooth introduction, these by working out an 'ultralong-term world energy supply and demand outlook' valid up to 2100. Various measures to deal with global warming are analyzed by simulation. The study is not to predict what is in store but to metrically describe and present choices and possibilities for the future with a theoretical consistency based on various factors including economic growth, population, demand for energy, magnitude of fossil energy resources, and feasibility and cost of recoverable energies. This study implies that there is not a single, determining policy for solving the global warming problem and that it is important to cope with the problem by resorting to combinations of various means. (NEDO)

  12. FY1995 fundamental study of imaging simulator for diagnostics and therapeutics using light; 1995 nendo hikari wo riyosuru shindan chiryoyo gazo simulator no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Medical application of lasers is rapidly expanding in accordance with the development of laser technology. However, it is difficult to predict how light propagates and is absorbed by living bodies because of strong scattering of light by biological tissues. Therefore, the determination of light dose has been based on experience. This fundamental study aims to develop a imaging simulator which can predict propagation of light and its effectiveness in medical diagnostics and therapeutics. Teoretical models of light propagation in biological tissues have been constructed, and experiments have been conducted to validate the theoretical calculation. In the theoretical calculation, a three-dimensional model which simulates a human head with five layers of different tissue types. Numerical calculation has been done by using the finite element method to simulate the propagation of ultrashort pulse light, and it is shown by a computer graphics technique for the first time in the world. In the experiment, a solid phantom which anatomically and optically simulates a human head based on MRI images has been fabricated by using the optical prototyping technology for the first time in the world again. Also, we have compared the experimental results of the transmitted light through the solid phantoms with the theoretical results and have succeeded in reconstructing the tomographic images of optical properties. (NEDO)

  13. Fiscal 1999 technical survey report. Basic survey of prioritized fields in Central Asia; 1999 nendo Chuo Asia chiiki juten bun'ya kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in four countries in Central Asia (Kazakhstan, Uzbekistan, Turkmenistan, and Azerbaijan), basic surveys were conducted into their energy policies, trends of supply and demand, electric power industry, metal refining industry, and cement making industry. Common to the four nations were that they were rich in energy resources (natural gas, oil, and coal) but that they failed to utilize them effectively despite of an increase in the yields. Incomplete infrastructures and delay in the implementation of energy measures attracted attention. A higher priority was found attached to the upgrading of and investment in structures, renewal of facilities, and the intensification of management. The basic industries wanted the modernization of their facilities and processes. As for electric power consumption, Kazakhstan consumed 53.0-billion kWh, Uzbekistan 39.0-billion kWh, Turkmenistan 4.4-billion kWh, and Azerbaijan 16.4-billion kWh. In Uzbekistan, where the nonferrous metal refining industry led its national economy, the energy consumption rate was found to be quite high. There was a decrease in production in the cement making industry. (NEDO)

  14. Basic research report for drawing up regional new energy vision (provisional name) for Gunma Prefecture; Gunmaken chiiki shin energy vision (kasho) sakutei kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In view of relatively good solar radiation that the prefecture enjoys and of a result of the investigations of this time conducted into the amount of new energy in existence, it is concluded that a fairly large amount of solar energy is collectable as the regional new energy for Gunma Prefecture. As for wind power energy, since there is no proper location in the prefecture where the annual wind speed average of not less than 5m/s is available, the value generally accepted as necessary for wind power generation, it is inferred that conditions in the prefecture in general are disadvantageous when it comes to wind power generation. As for hydraulic energy of small and medium dimensions, a result of the investigations shows that in the prefecture this energy is next to solar energy in terms of the amount expected to be collectable. In this prefecture, the prefectural project bureau makes use of the rich water resources and generates electric power, and supplied approximately 850-million kWh in fiscal 1998. Since it is feared that it will be difficult to find new sites for power generation in the area now remaining to be developed, however, prudence should be exercised in estimating the expected collectable amount of hydraulic energy. (NEDO)

  15. Fiscal 2000 survey report. On-site survey of local state of affairs such as energy efficiency enhancement (Mongolia); 2000 nendo energy shohi koritsuka nado chiiki josei genchi chosa hokokusho. Mongoru

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Information was collected and surveys were conducted in Mongolia in an effort to acquire information necessary for energy related technical cooperation. The results were arranged in four fields which are (1) the current state of economy and the future trend, (2) current state of energy production/consumption and the future trend, (3) current state of power supply/demand and power facilities and the future trend, and (4) the current state of energy efficiency enhancement and the future trend. Mongolia has a population of 2.45 million at a density of 1.57/km{sup 2}, with Ulan Bator the capital inhabited by 0.69-million people. The mean air temperature is -10 degrees C in the period November through March, which makes heating indispensable. Power stations are of the heat and power cogeneration type. Power is supplied by the Eastern, Central, and Western systems, with the Central system producing 80% or more and independent power sources 10%. Its economy has already recovered from the confusion that followed the change of its national constitution. Mongolia's demand for power lingers low, however, and its facilities can produce more electricity than what is now wanted. Energy efficiency enhancing activities should start with the upgrading, reinforcement, and maintenance of the existing facilities and with independent power sources. (NEDO)

  16. Fiscal 1999 technical survey report. Basic survey of prioritized fields in South Asia (India); 1999 nendo Minami Asia chiiki (Indo) juten bun'ya kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in India, a basic survey was conducted into India's energy policy, trend of supply and demand, steelmaking industry, papermaking industry, petrochemical industry, and chemical fertilizer making industry. India in fiscal 1997 consumed 374-million tons of energy in terms of oil, 30% in oil and 63% in coal. Activities were vigorous for the development of oil substitutes such as photovoltaic and wind power. The steelmaking industry that produced 22.12-million tons in fiscal 1996 was found to suffer from a reduced operating rate due to aging of facilities and from poor infrastructures such as harbor and railway facilities wanting maintenance. It was inferred that energy conservation facilities and technologies of Japan's steelmaking industry would work effectively. The cement making industry was found modernized, but faced the problem of the high cost of electric power. The papermaking industry was busy enhancing its own production capability. The fertilizer making industry ranked third in the world in terms of production, but the energy consumption rate at its ammonia plant was too high. The petrochemical industry was well developed, with Japan's technologies incorporated into it in the design stage. (NEDO)

  17. Basic study on mass transportation systems in buildings by means of multiple-cage elevators; Junkangata erebeta ni yoru biru nai tairyo yuso sisutemu no kiso kento

    Energy Technology Data Exchange (ETDEWEB)

    Fujino, A.; Tobita, T. [Hitachi, Ltd., Tokyo (Japan); Nakagawa, K. [Shimizu Corporation, Tokyo (Japan)

    1997-06-20

    From the viewpoints of realization of mass transportation, improvement of space factor in buildings, transportation systems in buildings are surveyed to compare the characteristics. Then, a loop-type independently-driven multiple-cage elevator (circulating elevator) system is proposed to estimate its transportation capacity, and necessary data for realizing transportation capacity higher than twice that of the conventional elevator are presented. As regards operational control, a high efficient control method is proposed which can restrain needless stops particular to the multiple-cage system and improve the waiting time and round trip time, and the result of the investigation by simulation is reported. Basic operation method of the loop-type elevator is determined, and the transportation capacity is estimated by simulation. The application in which the loop-type elevator can exhibit the best performance is its use in 15 floor-class buildings or for local bank zones in large-scale buildings in a system combined with the shuttle system. 9 refs., 12 figs., 5 tabs.

  18. Research report of fiscal 1997. Basic research on the commercialization of innovative energy technologies; 1997 nendo chosa hokokusho. Kakushinteki energy gijutsu no jitsuyoka ni kansuru kiso chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This paper summarizes the research result in fiscal 1997 from the basic research results on the commercialization of innovative energy technologies. The target of a photovoltaic power generation market includes isolated power sources (several kWp) for distant places or developing countries, and those (several tens kWp) for personal residences or public facilities. Although the former is mainly promoted in the West, while the latter over the world, their profitability is unsolved. Power plants over several hundreds kWp are in demonstration test. Solar heat power generation of several tens to hundreds MWp is most profitable, however, small-scale one is poor in feasibility. Australia takes an interest in distributed photovoltaic power generation directly connected with actual lives of residents, and has a dominant opinion that desert is useless as large-scale site. This country lays emphasis on protection and maintenance rather than positive use of desert based on a basic cognition that desert is easily changed and broken. The Australian government announced power company`s obligation to use renewable energy by 2%, and a strong organization is scheduled to be newly established. 59 figs., 57 tabs.

  19. Fiscal 1999 technical survey report. Basic survey of prioritized fields in South Asia (India); 1999 nendo Minami Asia chiiki (Indo) juten bun'ya kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in India, a basic survey was conducted into India's energy policy, trend of supply and demand, steelmaking industry, papermaking industry, petrochemical industry, and chemical fertilizer making industry. India in fiscal 1997 consumed 374-million tons of energy in terms of oil, 30% in oil and 63% in coal. Activities were vigorous for the development of oil substitutes such as photovoltaic and wind power. The steelmaking industry that produced 22.12-million tons in fiscal 1996 was found to suffer from a reduced operating rate due to aging of facilities and from poor infrastructures such as harbor and railway facilities wanting maintenance. It was inferred that energy conservation facilities and technologies of Japan's steelmaking industry would work effectively. The cement making industry was found modernized, but faced the problem of the high cost of electric power. The papermaking industry was busy enhancing its own production capability. The fertilizer making industry ranked third in the world in terms of production, but the energy consumption rate at its ammonia plant was too high. The petrochemical industry was well developed, with Japan's technologies incorporated into it in the design stage. (NEDO)

  20. Identification of modal parameters and spatial matrix in frequency domain. Basic theory; Shuhasu ryoiki ni okeru mode tokusei to tokusei gyoretsu no dotei. Kiso riron no kento

    Energy Technology Data Exchange (ETDEWEB)

    Iwahara, M [Isuzu Advanced Engineering Center, Ltd., Tokyo (Japan); Sugiura, T; Takaiwa, H; Nagamatsu, A [Tokyo Institute of Technology, Tokyo (Japan)

    1997-10-01

    An approach is presented for the identification of spatial matrix with modal parameters in the frequency domain. Modal parameters are transformed to spatial matrix with constraints of modal vector orthogonality and characteristic equation. Adding the connecting conditions or unconnected conditions of measuring points, spatial matrix is determined by modal parameters whose number is smaller than that of dimension of spatial matrix. 9 refs., 4 figs., 2 tabs.

  1. Fiscal 1999 technical survey report. Basic survey of prioritized fields in East Asia (China); 1999 nendo Higashi Asia chiiki (Chugoku) juten bun'ya kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in China, a basic survey was conducted on China's energy policy, trend of supply and demand, cement making industry, non-ferrous metal industry, chemical industry, and electric power industry. The amount of primary energy produced in China in fiscal 1997 was 1.4-billion tons in terms of standard coal, ranking third in the world. It produced 1.4-billion tons of coke making coal, 160-million tons of oil, and 110-million kWh of electric power. In spite of its continuous efforts to develop oil and in particular natural gas, it has now turned an oil importing country. There was an increase in production in the industries surveyed, but energy efficiency was low because of their small-scale old-fashioned processes. In the cement making industry, 86% of the facilities presented some problems, and the non-ferrous industry was planning to rebuild itself into large-scale advanced-process plants. As for the chemical industry, investigations were conducted into the oil refining, petrochemical, and chemical fertilizer making industries. The electric power industry had facilities for 277GW, 210GW in thermoelectric power generation and 65GW in hydroelectric power generation. The thermoelectric power plants were found to emit great quantities of smoke and sulfuric oxides into the air. (NEDO)

  2. Fiscal 1999 technical survey report. Basic survey of prioritized fields in South Asia (Bangladesh); 1999 nendo Minami Asia chiiki (Bangradesh) energy tashohi sangyo kiso chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in Bangladesh, a basic survey was conducted into Bangladeshi energy policy, trend of supply and demand, steelmaking industry, cement making industry, and chemical fertilizer making industry. Bangladesh in fiscal 1997 consumed 10-million tons of energy in terms of oil, 60% or more in natural gas (domestic), 20% in oil, and the remaining 20% in others. Approximately 15% of all the households were supplied with electric power. There was no integrated production plant in the steelmaking industry. Only one mill performed calcination in the cement making industry. The impact to be imposed by the steelmaking and cement making industries on Bangladeshi energy consumption would be small. Fertilizer making was an important industry outputting 2.6-million tons, responsible for 30% of natural gas consumption. The highest priority was given to facility rehabilitation and production enhancement, and there was little hope that energy conservation facilities/technologies would be introduced into the steelmaking and fertilizer making industries. It was possible, however, that the horizontal tube mill would be replaced by a vertical roller mill in the cement making industry. (NEDO)

  3. Achievement report for fiscal 1981 on Sunshine Program. Basic research on solvent treatment technology for coal; 1981 nendo sekitan no yozai shori gijutsu no kiso kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This research aims to prepare basic data on extraction liquefaction, which is one of the techniques of producing clean liquid fuels and chemical materials from coal, and thereby to contribute to the development of this process. The items taken up in this research are Item 1 on basic research using a small reactor, Item 2 on research on short-duration hydrogenation reaction in the intermediate temperature range, and Item 3 on basic research on the realization of a continuous operation. Item 1 is divided into Item (1) on primary hydrogenation extraction and Item (2) on secondary hydrogenation treatment. Under Item (1), hydrogenation characteristics are investigated of low rank coal with the Chinese brown coal heading the list and, under Item (2), the result of cleaner light oil production through secondary hydrogenation using different catalysts and the result of extraction from brown coal though secondary hydrogenation using a Co-Mo based catalyst are stated. Item 3 has been incorporated into Item 2 to stay there from this fiscal year on, and is divided into Item (1) on primary hydrogenation extraction and Item (2) on secondary hydrogenation treatment. Under Item (1), the result of a test operation of a small-size continuous coal hydrogenation extraction liquefaction unit using bituminous coal as specimen is reported and, under Item (2), the outline of a small-size fixed bed hydrogenation treatment unit newly installed this fiscal year is described. (NEDO)

  4. Report on results of research. Basic studies on characteristics of coal char gasification under pressure; Sekitan char no kaatsuka ni okeru gas ka tokuseino kiso kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This paper explains basic studies on characteristics of coal char gasification under pressure. Hydro-gasification of coal needs as a gasifying agent a large amount of hydrogen, which is effectively produced by the water gasification of exhaust unreacted residual char. In fiscal 1975, gasification was tested on Taiheiyo coal carbonized char by an atmospheric fluidized gasifier of 28 mm bore. In fiscal 1976, experiment was conducted under pressure by fully improving the auxiliary safety equipment. The char and gas yield increased with higher pressure in pressurized carbonization by an autoclave. In fiscal 1977, clinker was successfully prevented by using quartz sand for a fluidized medium. In fiscal 1978, two-stage continuous gasification was examined. In fiscal 1979, correlation was determined between operation factors such as gasification pressure, temperature, etc., and clinker formation/char reactivity. An experiment was conducted for particle pop-out using a pressurized fluidized bed of 100 mm inner diameter, with the pop-out quantity found to be proportional to the 0.38th power of a pressure. A high pressure fluidized gasifier was built having a char processing capacity of 1 t/day, 20 atmospheric pressure, and an inner diameter of 100 mm. In fiscal 1980, this device was continuously operated, elucidating problems for the practicability. (NEDO)

  5. Achievement report for fiscal 1984 on Sunshine Program. Basic research on coal type and gasification characteristics; 1984 nendo tanshu to gas ka tokusei no kiso kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-03-01

    The study of pressurized fluidized gasification of coal chars started in fiscal 1975, and a 0.2t/d unit was in operation until fiscal 1979. Since fiscal 1980, a 1t/d unit has been in operation. In fiscal 1984, an entrained bed gasification furnace was constructed, capable of high-temperature gasification of various coals, and it is now undergoing a test operation. This report consists of pressurized gasification tests for coal char, the result of a study on the effect of coal type on the char gasification reaction rate, and the result of experiments on the treatment of coal liquefaction residue, all accomplished in the 1t/d gasification unit. For the investigation of the effect of coal type, chars of 13 types of coals are subjected to reaction tests in the carbon dioxide gas, and weight reduction rates and changes in residue surface areas are determined while reaction is under way. The results are analyzed and parameters are made clear that enable a quantitative assessment of the effect of coal type on gasification reaction rates. Pulverized grains and coal liquefaction residue are blended and gasified in the fluidized bed in the presence of oxygen and steam. As the result, a gas capable of 2,000kcal/Nm{sup 3} containing 30% hydrogen and 25% carbon monoxide is acquired, when catalyst grains in the residue are segregated. (NEDO)

  6. Fiscal 1998 joint promotion basic research report. Energy saving project for Achinsk refinery in Russia; 1998 nendo kyodo jisshi nado suishin kiso chosa. Roshia Achinsuku seiyujo shoene project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For prevention of global warming by greenhouse effect gas, study was made on energy saving measures for Achinsk refinery in Russia. Achinsk refinery is a relatively new plant put into operation in 1983, however, because of no various equipment for use combustion heat effectively, its average thermal efficiency is as low as 60%-70%, resulting in fuel consumption more than necessary one. Based on the study result, the following remodeling designs were made: Improvement of a heat exchange efficiency by relocation of heat exchangers to reduce fuel consumption of a heating furnace as much as possible, conversion of an existing heating furnace based on an old design concept to an advanced one, installation of a waste heat recovery system including a preheating convection unit and air preheater, reinforcement of heating furnace wall insulator, installation of an optimum control system for furnace operation, and improvement of a fuel supply system efficiency. This design showed possible reduction of heating furnace load, and possible furnace thermal efficiency of 90%. (NEDO)

  7. Relation between peak period of microtremor spectral ratio (horizontal and vertical components) and basement depth; Bido no suiheido/jogedo supekutoru hi no peak to kiso shindo tono kankei

    Energy Technology Data Exchange (ETDEWEB)

    Yamamoto, H; Mizutani, K; Saito, T [Iwate University, Iwate (Japan). Faculty of Engineering

    1996-05-01

    The peak period of the horizontal/vertical spectral ratio of microtremors was referred to the underground structure for the purpose of finding out if it was possible to estimate the ground structure by use of the peak period of the spectral ratio. The observation was carried in the areas of Morioka City and Hachinohe City using seismographs for measuring east-west, north-south, and up-down motions. As for the relationship between the peak period of the spectral ratio distribution involving 490 observation sites and the known gravity anomalies in the Morioka City area, it was found that the peak period of the spectral ratio tended to be shorter from west toward east while the gravity anomalies were greater from west toward east. Again, as for the relations with the underground geology, the period was longer when the distance to the granite basement was greater, and shorter when smaller. In the Hachinohe City area, relations not only of the first period peak but also of the second period peak to the basement were disclosed, which indicates the possibility that the peak period of the spectral ratio will be used as a means for estimating the basement structure. 2 refs., 8 figs.

  8. Fiscal 2000 basic survey report for vision formulation. Regional new energy vision for Sabae city, Fukui prefecture; Sabaeshi chiiki shin energy vision. 2000 nendo sakutei kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Sabae city, Fukui Prefecture, has worked out a regional new energy vision for which the inhabitants, industrialists, and administrators combined their efforts to build a daily life related culture, friendly to environments and peculiar to the locality. The fruits of their activities are summarized in five chapters, which are (1) the basic philosophy, (2) survey of the amounts of new energy in existence, (3) survey of the amount of energy demanded, (4) various surveys conducted with the participation of the citizenry, (5) and summarization of important topics. Discussed in chapter (2) is the basic policy toward reckoning the amounts of new energy in existence, such as photovoltaic energy, solar heat energy, wind energy, hydraulic energy, temperature difference energy, and other energy resources remaining to be utilized. It states that they, when converted into electric power, 2.0 times 10{sup 8} kWh/year will be available and, when converted into heat energy, 2.92 times 10{sup 11} kcal/year will be available, accounting for approximately 30% of the city's energy consumption. When the energy resources are broken down by type, it is found that solar energy, wind energy, and refuse-derived energy are in existence aplenty. (NEDO)

  9. Fundamental experiment for flash removal of aluminum alloy by CO2 laser beam cutting; CO2 laser beam setsudan ni yoru aluminium gokin no ibaritori no kiso jikken

    Energy Technology Data Exchange (ETDEWEB)

    Kataoka, Y.; Tokunaga, T. [University of Industrial Technology, Kanagawa (Japan); Miyazaki, T. [Chiba Institute of Technology, Chiba (Japan)

    1995-08-25

    CO2 laser beam has been applied to cut of the aluminum alloy. Average cut width, roughness of cut surface and average thickness of heat affected zone are investigated as functions of laser power, cutting speed and assist gas pressure. The average cut width increases with laser power, but it does not depend on the cutting speed. The narrowest average cut width obtained is 0.22mm under the conditions of laser power of 900W and cutting speeds from 600 to 1000mm/min. The roughness of cut surface decreases with decreasing cutting speed. The best smoothness of cut surface obtained is 17 {mu}m (Rmax) , when the conditions are 1100W and 600mm/min. The average thickness of heat affected zone decreases with increasing assist gas pressure. CO2 laser beam cutting is applicable to flash removal from aluminum alloy casting. This process is expected to reduce the need of physical labor and to improve the working conditions in the foundry industry. 32 refs., 10 figs., 2 tabs.

  10. Fiscal 1999 survey report. Fiscal 1998 basic survey for promotion of joint implementation, etc. (Analysis of results); 1998 nendo kyodo jisshi nado suishin kiso chosa kekka no bunseki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The 40 'Surveys for promotion of joint implementation, etc.' conducted by NEDO (New Energy and Industrial Technology Development Organization) in fiscal 1998 aimed to pick out projects that would positively utilize the flexible measures (three Kyoto mechanisms) for the achievement of greenhouse gas reduction targets defined at COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change). In this paper, concerning these 40 surveys, studies are conducted for reaching conclusions about setting baselines for the future, execution of similar feasibility studies in the future, application of flexible measures, and opinions towards project implementation. The 40 surveys were, concretely speaking, conducted not to work out policies for actualization of given projects but to consider philosophies of project actualization and baseline formation for the future. In this paper, project outlines, environmental impact assessment, and economic assessment (investment assessment) are put in order for each of the surveys, and relations between amounts of global warming gas reduced and project costs, and project profitability, are analyzed for each of the surveys. (NEDO)

  11. FY1998 survey report on the site surveys on regional situations in improvement in energy consumption (Cambodia and Bangladesh); 1998 nendo energy shohi koritsuka nado chiiki josei genchi chosa hokokusho (Cambodia, Bangladesh) chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In order to promote technical cooperation of Japan with Asia in the energy aspect, site surveys were carried out on improvement in energy consumption efficiency. Electric power supply in Cambodia is made mostly from EDC, whose power generation amount in 1997 was 310 million kwh, while the power sold was 230 million kwh, with 26.1% of the total generation amount, or 80 million kwh being wasted as the loss. Existing power generation facilities are old and small in scale, made by the former Soviet Union making the repair difficult. The loss is enormous because of aging in power distribution facilities, overload operation, and power stealing. The efficiency is extremely poor, whereas improvement in efficiency of the existing facilities is indispensable to cope with the anticipated increase in the demand. In Bangladesh, 90% of the power is generated by using natural gas produced in the eastern part of the country. Many power plants are experiencing decreased efficiency due to the facility aging and insufficient and improper maintenance. The power transmission and distribution departments have had a large loss in power, which has become one of the most important issues. The loss exceeds 30%. The government is trying to achieve efficiency improvement in the electric power business through introducing the principle of competition by establishing new private companies. However, this approach is facing severe objection from the governmental and public labor unions, making the future development opaque. (NEDO)

  12. Fiscal 1998 research report on the basic research on the practical application of innovative technologies. 2; 1998 nendo kakushinteki energy gijutsu no jitsuyoka ni kansuru kiso chosa hokokusho. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This report is composed of the part 1 'Estimation of fossil energy resources and preliminary preparation of the super- long-term view of energy supply and demand', and the part 2 'Research on concrete conditions for introducing renewable energy (RES)'. In the part 1, estimation was made on the amount of non-conventional fossil energy resources such as oil sand, oil shale, coal bed methane and methane hydrate. Study was also made on the role of nuclear power, fast breeder reactor and nuclear fusion in the world energy supply and demand in the 21st century. In addition, as preliminary study on the super-long-term view of energy supply and demand in the next fiscal year, study was made on a scenario and measuring model considering energy supply restriction and CO{sub 2} problem. In the part 2, research was made on the amount of resources, applicable fields and cost estimation for various RESs such as solar energy, wind power, biomass, oceanic energy, geothermal energy and hydraulic power. Several technical issues on transport, storage, conversion and use for every energy were arranged toward real introduction, efficient use and stable supply of such RESs. (NEDO)

  13. Achievement report for fiscal 1982 on Sunshine Program. Basic research on plasma-aided coal gasification technology; 1982 nendo sekitan no plasma gas ka gijutsu no kiso kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    A technology is developed to produce useful gases such as acetylene, hydrogen, and carbon monoxide from coal and coal-related substances making use of the high-temperature high-density energy of plasma jets. Using the newly developed systems, the energy utilization rate is 50% or higher and the yields are 60-100g/kWh for acetylene and 100-160l/kWh for hydrogen. For the achievement of the goal, two types of plasma gasification systems have been developed. One is a '100kW 3-torch plasma gasification system' in which the specimen for gasification is fed to the center of the combined flame for improvement on the contact rate between the specimen and plasma flame. The other is a 'rotating plasma torch system' in which the flame is rotated, and expanded, by an externally provided magnetic field for improvement on the contact rate between the specimen and plasma flame and, simultaneously, for an increase in energy utilization efficiency by feeding the specimen into the discharge region. In this fiscal year, quenching tests are conducted using water and oil so as to establish the difference in quenching effect between quenching agents. What to improve in the systems are clarified. (NEDO)

  14. Basic research on promotion of joint implementation. Research on the overseas trend of activities implemented jointly; Kyodo jisshi suishin kiso chosa jigyo. Kyodo jisshi katsudo ni kakawaru kaigai doko chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The pilot phase of the activities implemented jointly (AIJ) was approved in 1995 in the 1st Conference of the Parties (COPI) of the United Nations Framework Convention on Climate Change to reduce greenhouse gas emission. In order to promote the AIJ Japan program smoothly, some practical examples in every preceding country and the situations and demands of Asian countries were researched. It was confirmed that since larger cost-effectiveness is achieved just in countries lower in emission control cost, AIJ can enhance the cost-effectiveness and promote environmental technology transfer. Japanese government had studied establishment of the framework for AIJ, and decided the basic framework of the AIJ Japan program in 1995. The government also approved the evaluation guidelines of this program which include confirmed and considered matters necessary for government offices related to this program to evaluate and approve each project.

  15. Fiscal 1999 report on basic research for promotion of joint implementation programs. Basic research on modification of Symferopoloskaya thermoelectric power station; 1999 nendo Symferopoloskaya karyoku hatsudensho kaishu kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This effort complies with the COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) joint implementation clause. The plan is to replace the existing old facilities with three units of 107MW rated single shaft combined cycle power plants. Each unit comprises one 70MW rated gas turbine generator, one water circulating reheat type steam turbine/air cooled synchronous generator, and one exhaust heat recovery boiler. The rated output will be 321MW in total, and the maximum heat supply 71Gcal/hour. Fuel consumption will be less by 304,800 tons/year in terms of oil at a reduction rate of 46.3%. Greenhouse gas will be less by 712,089 tons/year in terms of CO2 at a reduction rate of 46.3%. The modification will cost 224-million US dollars. To secure profitability under the project and to keep EIRR (economic internal rate return) at 15% or higher, CO2 has to sell at 13 US dollars/ton in terms of CO2 or a US dollar has to be equivalent to or less than 4.9 UAHs (with repayment to be made in US dollars). Profitability will vary extensively, dependent on fluctuations in the exchange rate reflecting the Ukrainian economic state and on the magnitude of greenhouse gas trading scheme. (NEDO)

  16. Fundamental study on hydrogen storage with hydrogen absorbing alloys. Operating characteristics of storage tank; Suiso kyuzo gokin wo mochiita suiso chozo ni kansuru kiso kenkyu. Chozo yoki no dosa tokusei

    Energy Technology Data Exchange (ETDEWEB)

    Sekiguchi, S.; Sekiguchi, N.; Tani, T. [Science University of Tokyo, Tokyo (Japan)

    1997-11-25

    Hydrogen absorption by a hydrogen storage (MH storage) is investigated for static characteristics, with a constant current applied to the hydrogen generator, and dynamic characteristics, with a fluctuating current applied to the same simulating actual insolation. In the experiment, alloy temperature (MH temperature) in the storage and a current for the generator are preset, and then automatic measurement is allowed to proceed at 10-second intervals of the differential pressure, hydrogen temperature in the piping, absolute pressure, MH temperature, room temperature, and water tank temperature. It is found as the result of the experiment that absorption performance is improved when the MH storage is cooled; that the mean absorption rate which is 1 without cooling increases to 1.62 at 7degC; that the mean absorption rate changes in proportion to the applied current (introduced hydrogen flow rate); that the rate which is 1 at 32A decreases to 0.53 that at 16A; that the absorption rate is dependent more on the current applied to the storage than the temperature of the heat exchanging medium; and that, even in the presence of fluctuation halfway in the applied current, the total absorption will be equal to a case of constant current application if the total amount of applied current is equal. 2 refs., 7 figs., 5 tabs.

  17. Preparation of ultrafine iron particles by chemical vapor deposition of Fe(CO) sub 5. Fe(CO) sub 5 wo gebryo to suru kiso kagaku hanno ni yoru tetsuchobiryushi no seisei

    Energy Technology Data Exchange (ETDEWEB)

    Sawada, Y; Kageyama, Y. (Mitsubishi Petrochemical Co. Ltd., Tokyo (Japan)): Iwata, M. (Nagoya University, Nagoya (Japan). Faculty of Engineering)

    1991-11-10

    An ultrafine iron particle preparing process was developed, which wses gaseous phase pyrolysis in magnetic field of iron pentacarbonyl, Fe(CO){sub 5}, based on the fact that Fe(CO){sub 5} has peculiar characters that its boiling point is as low as 103{degree}C, and starts decomposing in a low temperature zone of 100{degree}C or lower. Vaporizing and introducing into a reactor an fe(CO){sub 5}, andPyrolyzing it at 200-600{degree}C while being diluted with nitrogen and applied with a magnetic field produced uitrafine iron particles of a necklace-like chain comprisinh primary particles having diameter of 15 to 25 nm with 10 to 40 of them linked in a straight chain. It was found that the specific surface area is 30-50 m{sup 2}/g, with the diameter converted from the specific surface area being relatively close to the average diameter obtained from TEM photograph, and that the particle has few pores. Magnetically the iron powder has a coercivity of 123-131 KA/m and a specific saturation magnetization of 120-140 Am{sup 2}/kg, and is expected to be applied as a high density magnetic recording medium. 5 refs.,8 figs., 3 tabs.

  18. Study of reaction and heat release from solid combustion in strong magnetic field; Kyojiba wo riyoshita hikinshitsu kotai nensho shori no hanno to netsu no seigy ni kansuru kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Ito, K; Fujita, O; Iiya, M; Kudo, K [Hokkaido University, Sapporo (Japan)

    1997-02-01

    To establish the inhomogeneous solid combustion control technology, effects of the strong magnetic field on the solid combustion were examined. When applying the sufficiently strong magnetic field, it is possible to control the air flow in combustion field by utilizing the force applying to constituent oxygen with large susceptibility. Based on this possibility, combustion experiments of expanded polystyrene plates were conducted between the magnetic poles of electro-magnet having the maximum flux density of 1 T and the maximum magnetic field gradient of 0.5 T/cm. To observe the effects of magnetic field without the effects of natural convection, combustion experiments of acrylic sheets were conducted between the magnetic poles of electro-magnet having the maximum flux density of 0.6 T and the magnetic field gradient of about 0.1 T/cm under the microgravity conditions between 10{sup -4} and 10{sup -5}g using a microgravity test facility. Consequently, prospective combustion results could be obtained, in which the force of flame received from the magnetic field is almost equivalent to the buoyancy of flame. It was demonstrated that combustion can be controlled by the magnetic field. 1 ref., 3 figs., 1 tab.

  19. Fiscal 1998 research report on the basic study on the effect of microgravity on living individuals; Bisho juryoku no seibutsu kotai ni taisuru eikyo no kiso kenkyu 1998 nendo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In order to clarify the effect of microgravity on vital functions and organisms at a cell level, this research studies the molecular biological response function of higher animals, the gravity acceptable mechanism of single-cell organisms, the effect of gravity on geotaxis of insects, measurement of monoamine system neurotransmitters of rat hippocampus by dialysis in a brain and the effect of microgravity on it, the effect of microgravity on water and bone metabolism functions and immunity function, and the analysis of BZ reaction as a simple model of vital reaction. The themes of the research are as follows: the effect of microgravity environment on cell fusion, the analysis of gravity acceptable mechanisms of single-cell organisms, the effect of oriental medical treatment on bone metabolism anomaly of mouses under microgravity environment, the effect of oriental medical treatment on change in physiological function under microgravity environment, the effect of microgravity environment on immunity systems, the effect of gravity on cell activities, the effect of a gravity field on chemical oscillation reaction, and the effect of gravity on geotaxis of insects. (NEDO)

  20. FY 1998 basic survey to promote the joint execution, etc. Plan for repair of Schekinskaya thermal power plant; 1998 nendo kyodo jisshi nado suishin kiso chosa. Schekinskaya karyoku hatsudensho kaishu keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project is a feasibility study to get effects of reducing greenhouse effect gas by repairing Units 8, 9, and 10 (330MW in total) of Schekinskaya thermal power plant and Units 1-7 (450MW in total) of Novomoskovskaya thermal power plant. Both are very old brown coal fired thermal power plants which were constructed during 1947-1967. At present, they are run fired by natural gas. Being very superannuated, they need repair of the facilities. In the adjustment of opinions with Russia, the plan was aimed at substantial reduction of greenhouse effect gas by increasing thermal efficiency of power plant. For it, a 800MW class gas turbine combined cycle power plant is constructed at Novomoskovskaya power plant where there are existing buildings and space for equipment and where gas fuel can be used. As a result of the study, it was indicated that the reduction amount of greenhouse effect gas after the repair becomes 1,853,966 tons/yr as against 3,590,514 tons/yr before the repair. (NEDO)

  1. Report on the basic survey on the commercialization of innovative energy technology in the Tibet district; Tibet chiku ni okeru kakushinteki energy gijutsu jitsuyoka no jisshi ni kansuru kiso chosa report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A field survey was conducted with the aim of commercializing innovative energy technology in the Tibet district. The survey included the energy supply/demand situation and supply plan and the situation of new energy utilization in the Tibet district. And, based on the concrete circumstances in the Tibet district, a realistic plan was presented for solution to the energy supply/demand problem. To carry out the project, used are a lot of solar energy and wind power energy resources which are abundant in Tibet. In about 5 years, 100 sets of village use system and 80,000 sets of household use system are to be installed, which solves the problem on electric power demand in a part of the non-electrified houses. Accordingly, farmers/stockbreeders living in the non-electrified region will alter their life patterns which are closed and behind other countries, get out of the poverty, basically enhance the quality of life, promote the communication of various knowledge/information of scientific technology, renew their life/production concepts, and heighten the production efficiency for the wealthy society. The project itself belongs to the construction for protection of ecological environment. It produces no exhaust gas/solid waste which do harm to the environment. The ecological environment efficiency is very high. (NEDO)

  2. Report on the site surveys in fiscal 1999 on the regional situations such as energy consumption efficiency improvement. The north-western part of China; 1999 nendo energy shohi koritsuka nado chiiki josei genchi chosa hokokusho. Chugoku seihokubu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the site surveys in fiscal 1999 on the energy consumption efficiency improvement in the north-western part of China. Although blessed with affluent natural resources, the regional development is delayed because of geographical restrictions and harsh climate conditions. Power generation facilities include hydroelectric power plants with output of 7.81 million kW, thermal power plants with 13.89 million kW, and power wind power plants with 70 thousand kW. The demand is estimated to increase by 4.6% annually in average. Thermal power plants are those made by the former Soviet Union, having poor power generation efficiency, which is scheduled to be improved by facility modification. Automation is also behind the times. These situations have brought about low reliability, delay in building electric power network in agricultural districts, and transmission wire loss (reducing 8.1% loss to 6% is planned). The electric power charge systems also have various problems. Environmental measures are also an issue. Dissolution of energy shortage as a result of developing the north-western area can be said a key to the future development of China. Xinjiang Electric Power Company is considering wind power generation as the center of new energy utilization. Representative facilities utilize affluent wind power available in the topography of the Tenzan mountain range in the suburb of Urumqi, the facilities being made of Denmark. Photovoltaic power generation is exiguous in realizability for the time being in terms of cost. Expectation is placed on fuel cells. (NEDO)

  3. Fiscal 1999 international energy conservation model project. Report on result of demonstrative research concerning cement clinker cooling system; 1999 nendo kokusai energy shohi koritsuka nado model jigyo seika hokokusho. Cement clinker reikyaku sochi ni kakawaru jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing energy consumption and CO2 discharge in a cement plant in Indonesia, R and D was conducted on new clinker cooling system, high performance kiln combustion system, and technology for steady kiln operation and control, with the fiscal 1999 results reported. In the research on the optimum clinker cooling system, a new type clinker cooling system (CCS) was developed in which air beams are applied only to stationary grate rows, in an air beam type clinker cooling system where cooling air is fed to each block, with grate plates used as the air duct. This year, in an actual machine testing equipment (capacity 2,500 t/d), the whole heat recuperation area was modified for the CCS, with the operation started since February, 1999, aiming at the optimal clinker cooling effect and high heat recovery efficiency. The heat quantity for the entire system showed a decrease of 60 kcal/kg in the heat consumption rate through CCS modification, kiln burner adjustment, etc. So long as the demonstration plant is concerned, design of a new type burner and study/design for the kiln stabilization were nearly completed. (NEDO)

  4. Fiscal 1999 report on basic research for promotion of joint implementation programs. Basic research on Semipalatinsk, Republic of Kazakhstan, cement mill modernization; 1999 nendo Kazakhstan kyowakoku cement kojo kindaika kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project aims to carry out the COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) protocol. In the clinker calcination sector, the wet kiln will be replaced by a dry NSP (new suspension preheater) kiln, and the existing four lines of material manufacturing facility and of clinker calcination facilities will be converted into single lines, respectively. Skills of the highest level will be applied to each of the facilities. The dry process will be dispensed with thanks to the dry kiln, which leads to drastic energy efficiency improvement. The change from ball mills to roller mills reduces electric power consumption. Energy reduction is expected to be 48,554 tons/year in oil at a saving rate of 39%. Greenhouse gas reduction is expected to be 216,960 tons/year in CO2 at a reduction rate of 28.5%. Provided that the construction cost is 98-million US dollars and the yield is 762-thousand tons, the internal rate of ROI (return on investment) will be 5.7% after tax (fully self-financed). ROE (return on equity) values are calculated under various borrowing conditions, and then it is found that the project will be feasible if a low interest loan with a long term of repayment is available. Since all the cement mills are obsolescent in the republic, the conversion of the present kilns into NSP type kilns will gain public favor. (NEDO)

  5. Report for fiscal 1999 on the fundamental survey on promotion of joint implementation. Modernization of Bakabad Cement Factory; 1999 nendo kyodo jisshi nado suishin kiso chosa Bekbad cement kojo kindaika chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper describes the result in fiscal 1999 of the feasibility study applied with the COP3 clean development mechanism for Bekabad Cement Factory in the Republic of Uzbekistan. One of the existing three old type kilns were diverted and converted into a dry NSP type kiln (having the same production capacity as the present of 726,000 tons a year). This arrangement was intended to enhance the productivity, save the energy, and reduce emission of greenhouse gases and different pollutants by renewing the upper and lower stream facilities and installing such environmental devices as electric dust collectors and bag filters. The total construction cost is US$84,432,000. Reducible energy consumption and reduction quantity of greenhouse gases would be 73,232 toe/year and 176,528 toe/year, respectively, in the single fiscal 2006. The cumulative quantity over twenty-year period until 2025 would be 1,464,640 toe and 3,530,560 toe, respectively. The energy saving effect per US$1,000 would be 17.87 toe, and the greenhouse gas reduction effect would be 43.08 t. In the case of using a soft loan such as the special yen loan for environment application, the internal profit rate after tax would be 7.63%, which is not high as the business enterprise profitability. However, the profit and loss statement indicates creation of profit after two years of operation, hence there is a relative realization possibility. (NEDO)

  6. Application of a temperature selective storage tank solar system. Part 4. Fundamental experiment under a solar simulator; Ondo sentaku chikunetsuso no solar system eno tekiyo. 4. Solar simulator ni yoru kiso jikken

    Energy Technology Data Exchange (ETDEWEB)

    Kanayama, K; Endo, N; Baba, H; Okamoto, A [Kitami Institute of Technology, Hokkaido (Japan); Kamiya, Y [Kanto Gakuin University, Yokohama (Japan)

    1996-10-27

    The storage tank is classified into a mixed type and stratified type. The stratified type is judged to be more advantageous from a viewpoint of the effective energy utilization. An experiment was made using a solar simulator to put the system, consisting of a vacuum double-glass tube collector and temperature selective storage tank, to practical use. The ejection position of the storage tank at the top is superior to that at the bottom, in the 60{degree}C layer of three layers (60, 40, and 20{degree}C). The ejection position hardly varies with the shape (straight or elbow) of an ejection port. When the temperature stratified layer is formed in two layers (40 {times} 2, 20{degree}C) to three layers (60, 40, and 20{degree}C), heat can be stably stored as the flow rate is higher. The stratified storage tank is inferior to the mixed storage tank in heat collection efficiency, but the specific exergy increases. By increasing the number of heat storage layers, the result of this experiment can also be applied to the linear temperature gradient layer obtained in the practical use. As a result of the above experiment, the basic data for an automated system design during practical application was obtained. 3 refs., 15 figs.

  7. FY 1998 survey report on the basic study of a possibility of cooperation in new energy technology in China; 1998 nendo Chugoku ni okeru shin energy gijutsu kyoryoku kanosei kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The development and utilization of new energy and reusable energy in China have greatly progressed for these 20 years, but it is necessary to further enhance the rate of these energy in the energy structure by heightening the conversion efficiency and reducing the production cost. As to the matured technology, it is necessary to attempt a large scale modernization and form a completed production/service system by making large breakthrough of new technology/new industrial art. For improvement of levels of a lot of new energy technology, emphasis should be placed on international cooperation, R and D, and model business. Together with the introduction of reusable energy such as photovoltaic, wind, geothermal and ocean power, the conventional low efficiency biomass utilization system is converted one after another. The development/spread of clean coal technology are promoted, and the rate of the hydroelectric/atomic power generation is heightened. By 2010, the full-scale application/spread of new energy technology should be advanced, and the technology and production of the world top level should be realized. It is necessary to make the energy consumption clean and promote the continuously harmonized growth of economy, society and environment. (NEDO)

  8. Achievement report for fiscal 1981 on research under Sunshine Program. Basic research on high-calorie gas production technology; 1981 nendo sunshinte keikaku kenkyu seika hokokusho. Kokarori gas seizo gijutsu no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Test and research are conducted for acquiring basic data regarding coal gasification. In the basic research for the development of a high-calorie gas production process, a small moving bed gas furnace is improved, and a high-calorie gas of a heating value of approximately 5,100kcal/m{sup 3} is stably produced at a rate of approximately 20m{sup 3} per diem. The carbon conversion rate turns out to be approximately 37% for the gas, approximately 53% for the residual char, and approximately 10% for a mixture of tar, naphthalene, benzene, phenol, etc. Hydrogen is produced making use of the residual char when a small amount of coal is added, and it is deemed that the first experiment for the development of a moving bed hydrogasification process has been successfully completed. In the study of the mechanism of hydrogasification reaction, the result of a preliminary experiment in a fixed bed pressurized gasification furnace is compared with the data from a continuous gasification experiment, and the relationship is determined between the coal feed rate and the reaction rate. Conducted besides are a basic study of problems relating to operation, basic research on a reaction mechanism (carbonization by rapid heating), estimation of the equilibrium composition of gas generated by coal gasification, etc. (NEDO)

  9. Report on fundamental investigation in fiscal 2000 of intellectual property right management criteria at General Research Institute of Industrial Technologies; 2000 nendo sangyo gijutsu sogo kenkyusho chiteki zaisanken kanri kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Fundamental items of knowledge were collected on matters to form the base of management and utilization of intellectual property rights as the basic data for cooperation among industry, academia, and government. Activities were put into order on the following nine fields: 1) handling of tangible research property rights at universities, 2) the way the organization should be to support the cooperation between industry and academia - a mechanism at Massachusetts Institute of Technology (MIT), 3) licensing and technology transfer in India, 4) intellectual property trends for the 21st century, 5) management of intellectual property assets - in relation with the new current in the U.S. Patent Act, 6) comparative study of examination guidelines for computer-related inventions between the United States and Japan, 7) management of intellectual properties and business law aspects in the technology innovation times - examples in Seattle where IT and bio-technologies are originated from, 8) patents and bio-technical inventions, and 9) new movements in bio-technology patents. In Item 2), examples at MIT were studied on the way the organization should be to support the cooperation between industry and academia. The industry-academia cooperation is in action at various levels, not only in licensing, but also in the industrial liaison program, and consortiums. (NEDO)

  10. Fiscal 2000 achievement report. Model project for international energy consumption efficiency improvement (Model project for improvement of boiler and turbine efficiency); 2000 nendo seika hokoku. Kokusai energy shohi koritsuka tou model jigyo (Boira tabin koritsu kojo model jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-12-01

    A project was implemented for Japan to transfer its energy conservation technologies for helping Indonesia conserve energy and reduce CO2 emissions, which occurred at Muara Karang Thermal Power Plant of an Indonesian power company named PT PJB. Items to be introduced are condenser tubes (material change from cupro-nickel to titanium), ball cleaning equipment, turbine gland seal improvement, air preheater improvement, thermal efficiency management system, and so forth. In this fiscal year, turbine gland seals and air preheater elements were manufactured, and the thermal efficiency management system was designed. As an dissemination activity, 10 engineers were invited to Japan from the Indonesian Ministry of Energy and Mineral Resources, PT PLN, and PT PJB. They attended a training program lasting approximately two weeks, which included study tours to the factories actually building the equipment to be introduced and field/classroom training/education on thermal efficiency management and others. The engineers actively performed their boiler improvement work back in Indonesia. (NEDO)

  11. Fiscal 1997 research report. International energy use rationalization project (Analytical tool research project for energy consumption efficiency improvement in Asia); 1997 nendo kokusai energy shiyo gorika taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The project aims to prepare inter-industry relations tables and models for energy analysis for Asian countries and thereby to probe into relations between the industrial structure or the ultimate consumption structure and energy consumption. For the comprehension of energy consumption as broken by each industry, Asian nations' inter-industry relations tables and energy statistics are linked for the compilation of energy analysis oriented inter-industry relations tables, and the resultant tables are used for the metric analysis of industrial structures and energy consumption structures in these countries. The tables prepared this time are 1985 tables for Korea, Indonesia, Thailand, and the Philippines and 1990 tables for China, Singapore, and Malaysia. The Malaysian transportation sector needs to be improved in energy saving. In Singapore, energy saving is functioning effectively in the transportation sector. China's energy consuming industries are those involving coal, chemistry, steelmaking, ceramics, and earth and quarrying. In Taiwan, improvement needs to be made in the transportation sector. Korea should conserve energy in the transportation sector. In the Philippines, energy needs to be saved in businesses related to water supply, transportation, and fishery. Thai industries as a whole needs to save energy. Improved energy consumption efficiency is sought for in the Indonesian cement related sector. (NEDO)

  12. Fiscal 1997 research report. International energy use rationalization project (Analytical tool research project for energy consumption efficiency improvement in Asia); 1997 nendo kokusai energy shiyo gorika taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The project aims to prepare inter-industry relations tables and models for energy analysis for Asian countries and thereby to probe into relations between the industrial structure or the ultimate consumption structure and energy consumption. For the comprehension of energy consumption as broken by each industry, Asian nations' inter-industry relations tables and energy statistics are linked for the compilation of energy analysis oriented inter-industry relations tables, and the resultant tables are used for the metric analysis of industrial structures and energy consumption structures in these countries. The tables prepared this time are 1985 tables for Korea, Indonesia, Thailand, and the Philippines and 1990 tables for China, Singapore, and Malaysia. The Malaysian transportation sector needs to be improved in energy saving. In Singapore, energy saving is functioning effectively in the transportation sector. China's energy consuming industries are those involving coal, chemistry, steelmaking, ceramics, and earth and quarrying. In Taiwan, improvement needs to be made in the transportation sector. Korea should conserve energy in the transportation sector. In the Philippines, energy needs to be saved in businesses related to water supply, transportation, and fishery. Thai industries as a whole needs to save energy. Improved energy consumption efficiency is sought for in the Indonesian cement related sector. (NEDO)

  13. FY 1980 Report on results of Sunshine Project by Coal Group. Basic researches on coal liquefaction techniques by solvolysis; 1980 nendo sunshine keikaku sekitanhan hokokusho. Sekitan no solvolysis ekika gijutsu no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    The basic experimental researches were carried out for coal liquefaction by solvolysis. The studied items include hydrogenation conditions for treating the primary liquefied products, asphalt, pitch and model solvents (e.g., anthracene oil) in the presence of a commercial catalyst, solvolysis conditions for finely divided, molten coal using a hydrogenation recycled solvent, hydrotreating solvents, analysis of solvolysis-liquefied products, and liquefaction capacity of fractionated solvents for finely divided, molten coal. The studied items for separation of minerals include settlement at high temperature of the solid residue from the first liquefaction stage, and changed coal particle size distribution as a result of the first-stage liquefaction reactions in the presence of a hydrogenation solvent. The experimental study results indicate that conversion of finely divided molten coal into asphaltenes and preasphaltenes is notably accelerated in the phase-II coal liquefaction process by solvolysis, when a hydrotreating solvent is used for the first stage solvolysis process. (NEDO)

  14. On the fault system and basement structure in and around the epicentral region of the 1995 Hyogo-ken Nanbu earthquake; 1995 nen Hyogoken nanbu jishin shingen shuhen no danso kiso kozo ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Yokokura, T; Kano, N; Yamaguchi, K; Miyazaki, T [Geological Survey of Japan, Tsukuba (Japan); Ikawa, T; Ota, Y; Kawanaka, T [Japex Jeoscience Institute, Tokyo (Japan)

    1996-05-01

    A reflection elastic wave seismic survey was carried out as part of the emergency survey of active faults in relation with the Hyogo-ken Nanbu Earthquake. This paper presents an interim report on the survey covering a wide area with deep structure as the survey object. The paper mentions that processing the survey data has been nearly completed, and is in the stage of making analyses and interpretations of the result of the processing, and that the survey was an attempt of making a unified survey over land areas, shallow sea areas, and seas by setting twelve traverse lines in and around the epicenter region. The paper also introduces briefly what has been found on hypocenters used, vibration receivers, vibration intervals, and CPD intervals, and on shapes of faults, particularly the continuity (the relationship of the Ashiya fault, Koyo fault and Osaka bay fault with the above two faults, branching of the Osaka bay fault, faults between the Wada promontory fault, Awaji Island and the Osaka bay fault, the fault off the east coast at the central part of Awaji Island, the Shichiku fault on the west coast of Awaji Island, and the basement fault). Mention is given also on the basement structure chart of the Osaka bay prepared preliminarily for the purpose of reference. 2 figs.

  15. Fiscal 2000 survey report. Basic survey of promotion of joint implementation, etc. Rehabilitation of KESC gas turbine power plant; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. KESC/gas turbine hatsudensho rihabiri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    KESC (Karachi Electric Power Supply Corporation) facilities supplying electricity to Karachi, Pakistan, were examined for rehabilitation aiming at energy conservation and greenhouse gas reduction. The rehabilitation program covered power generation facilities, fuel supply facilities, instrument control systems, and their layout. Discussed were a schedule for the production, transportation, and installation of facilities, sharing of burdens between KESC and Japan, and the economic and environmental merits expected to ensue from energy conservation and greenhouse gas reduction. The results are mentioned below. Project implementation will take approximately 18 months, and Japan will be responsible only for dispatching specialists to elaborate on CDM (clean development mechanism) and engineers. In Case 1, the amount of initial investment is estimated at 84-million US dollars, the economical efficiency of energy conservation at 107t/year/million yen, and the economical efficiency of greenhouse gas reduction at 330t-CO2/year/million yen. It is found in the study of profitability that the loan will be collected in 10 years after project implementation and the initial investment in 22 years. (NEDO)

  16. Basic investigation on promotion of joint implementation in fiscal 2000. Project for modification of Pridneprovskaya power plant in Ukraine; 2000 nendo kyodo jisshi nado kiso chosa hokokusho. Ukraine Pridneprovskaya hatsudensho kaishu jigyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  17. International measures project for rational energy use (Survey project of the analysis tool of Asian energy consumption efficiency). List of errata; 1998 nendo kokusai energy shiyo gorika nado taisaku jigyo seigohyo. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The list of errata was prepared for the data book of the international measures project for rational energy use (Survey project of the analysis tool of Asian energy consumption efficiency). Corrected pages of the data book 1 (1990) are as follows: 187-190, 223-226, 259-262, 295- 298, 369-370, 387-388 and 405-406 on Malaysian data. Corrected pages of the data book 2 (1985) are as follows: 102-105 on Chinese data, 154 on common data, and 187-190, 223-226, 259-262, 295-298, 369-370, 387-388 and 405-406 on Malaysian data. (NEDO)

  18. Proposal of an efficient operation method about order processing sequence and allocating goods to racks in the automatic picking system; Jido picking system ni okeru shohin no tanawaritsuke to chumon shori junjo no koritsuka un`yo hoshiki no teian

    Energy Technology Data Exchange (ETDEWEB)

    Ono, T.; Kagami, A.; Kosaka, M. [Hitachi Ltd., Tokyo (Japan)

    1997-07-05

    The material distribution center is a facility to store the goods from a factory and to prepare to ship the goods in response to order from retail store. Recently, with multiplication of consumption market, multi-variety and less-amount of the goods, multi-frequency of delivery and time saving form order to delivery are required. As picking work to prepare the stored goods for each customer requires specially many man-hours out of the works in this center, time saving of working becomes an important problem. In this paper, for an object of the automatic picking system constructed by plural equipments and to execute picking of small goods for each order, the following two operation methods were proposed: (1) To define shelf sharing of the goods so that the picking requirement numbers for each picking hand may be uniform as well as possible in response to order distribution for each goods, and (2) to define treating sequence of order so as not to generate large difference in order treating times among each treating hand on operation in parallel. These operation methods were confirmed their total treating time saving by some experiments using actual ordered data. 7 refs., 8 figs., 6 tabs.

  19. Achievement report for fiscal 1981 on research under Sunshine Program. Basic research on plasma-aided coal gasification technology; 1981 nendo sushine keikaku kenkyu seika hokokusho. Sekitan no plasma gas ka gijutsu no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Researches are conducted for the development of a technology of producing useful gases such as acetylene, hydrogen, carbon monoxide, etc., from coal by the use of the high temperature and high-density energy of the plasma jet. In an experiment using a 100kW 3-port plasma-aided gasification unit, rapid quenching tests are conducted using hydrogen and helium, where the reaction furnace is changed, the specimen feed device is changed, and the plasma torch head is replaced by a high-power head. In a test of the coal specimen, it is found that rapid quenching exerts a great effect on the prevention of re-decomposition of the generated acetylene into hydrogen and carbon black and that a rise in the hydrogen partial pressure results in a great decrease in the quantity of acetylene generated. The said torch head replacement increases the rate of the coal specimen infiltrating into the plasma flame, which brings about an increase in the quantity of acetylene generated. It is found after all that the conventional acetylene yield of 34g/kWh increases to 59g/kWh in a rapid quenching test in which the specimen is dried Akabira coal and the plasma is an argon gas plasma containing 40% hydrogen. (NEDO)

  20. Report for fiscal 1998 on basic commercialization survey related to geological structure surveys in overseas countries (Manguerra, the Philippines); 1998 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa (Philippines Manguerra) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Commercialization survey was performed on the mines in the Manguerra district in the Philippines by means of geological structure surveys. The site surveys included geological and test drilling surveys, and those on conditions for developing underground mining mines, and infrastructures. The geological survey area spread out about 5 km{sup 2}, two test wells were drilled (to depths of 330 m and 290 m), trench survey was performed on 58 locations, and coal sample collection and analysis were carried out on eight locations. Furthermore, surveys were extended to the Manguerra mine operating status, on-the-ground facilities, roads for transportation, marketing, and related laws and regulations. As a result of the surveys, the Manguerra district was suggested of frequent sea water inundation into the coal field, leading to a view that the district is unstable from the viewpoint of development of coal beds. However, samples collected from the existing mining area indicated to have less water content and ash and high calorific power. The coal has high product value. The result of coal quantity calculation indicated 320122 tons as the total of defined and estimated quantity. The great depth mining plan was prepared from the viewpoints of actual yield, productivity, safety aspects, technological enhancement, and suppression of additional investments to minimum. (NEDO)

  1. FY1998 research report on the basic research on geothermal district heating in Kamchatka, Russia; 1998 nendo Roshia Renpo Kamchatka shu ni okeru chinetsu riyo ni yoru chiiki danbo ni kansuru kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    Petropavlovsk-Kamchatky (P-K) city in Kamchatka, Russia is operating hot-water district heating using heavy oil boilers and waste hot water of thermal power plants as heat sources. Feasibility study was made on district heating using natural geothermal hot water and/or geothermal heat pump systems as heat sources of hot water supply for reduction of greenhouse effect gas emission. Among 3 areas including geothermal hot water, use of hot water in K area was impossible because of lower temperature and less spring water. Use of hot water in P and UP areas was impossible as primary hot water because of temperature drop to 64 degrees C during hot water supply toward P-K city. The building heating operation test was carried out using the geothermal heat pump system installed in a newly drilled heat exchange well of 100m deep. As a result, sufficient heat recovery was achieved for heating. If all of 49 boiler houses for heating are replaced with such geothermal heat pump systems, CO{sub 2} reduction was estimated to be 520,000t/y. (NEDO)

  2. Fiscal 1998 research report. International measures project for rational energy use (Survey project of the analysis tool of Asian energy consumption efficiency); 1998 nendo chosa hokokusho. Kokusai energy shiyo gorika nado taisaku jigyo (Asia energy shohi koritsuka bunseki tool chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This project aims to prepare the inter-industry relations table and analysis model for energy analysis for every Asian country, and analyze the relation between energy consumption and industrial structure or final demand structure. The 1985 and 1990 inter-industry relations tables of each country were prepared in cooperation with the governmental organizations of China, Korea, Taiwan, Philippines, Thailand, Malaysia, Singapore and India. However, the 1987 and 1990 tables were prepared for China. In fiscal 1998, the project invited the representatives of each concerned organization, and held the international workshop together with Japanese specialists to discuss various issues related to not only table preparation but also data analysis. The following items were analyzed for every country: a change in final energy consumption, a dependence on coal in primary energy consumption, transfer of energy consumption to other energy resources, and an energy consumption rate in the whole industry. (NEDO)

  3. Fiscal 1997 research report. International energy use rationalization project (Analytical tool research project for energy consumption efficiency improvement in Asia); 1997 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo (honpen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Efforts have been under way to prepare inter-industry relations tables and energy data for four Asian countries, namely, China, Taiwan, Singapore and Malaysia, and a tool for energy consumption efficiency analysis has been developed and improved. In Chapter 1, energy supply and demand in the above-named four countries is reviewed on the basis of recent economic situations in these countries. In Chapter 2, bilateral inter-industry relations tables usable under the project are employed for the analysis of the economic status of each of the countries and energy transactions between them, and a method is described of converting the tables into one-nation inter-industry relations tables which meet the need of this project. In Chapter 3, national characteristics reflected on the respective energy input tables are described, and a method is shown of converting a nationally characterized unit energy table into a common unit energy input table for registration with a database. In Chapter 4, the constitution of the Asian energy consumption efficiency improvement analyzing tool and a system using the tool are explained. In Chapter 5, some examples of analyses conducted by use of the analyzing tool are shown, in which the energy saving effect and CO2 emission reduction effect are estimated for Indonesia by use of the analyzing tool. (NEDO)

  4. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey of gas-fired cogeneration in Samarkand City; 2000 nendo kyodo jisshii nado suishin kiso chosa hokokusho. Samarkand shi gas daki cogeneration chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In the existing heat supply plant in Samarkand City in Uzbekistan, feasibility study was conducted of the project aimed at energy conservation and reduction in greenhouse effect gas emission by introducing the repair/cogeneration system of the regional pipes superannuated. In the project, the following were planned: introduction of two units of 6MW class gas turbine cogeneration, introduction of boiler which can realize 90% of the thermal efficiency, replacement of the existing regional pipes with pre-insulated pipes with less water leak/heat loss, etc. As a result of the study, the energy conservation amount was 21,006 toe, and the amount of greenhouse effect gas reduction was 64,998 t-CO2/y. As to the effects vs. expenses, the energy conservation was 2.80 toe/million yen, and the greenhouse effect gas reduction was 8.66 t-CO2-y/million yen. The initial investment amount was 7.51 billion yen, the business profit was 468 million yen/y, and the internal earning rate was 1.133%. It was judged that great profitability was not expected for the project, but the profit was returnable on investment. (NEDO)

  5. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project for the modernization of the Tashkent cogeneration plant; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Tashkent netsuheikyu hatsudensho kindaika keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was carried out of the project for energy conservation and greenhouse effect gas emission reduction by introducing the newest and most powerful gas turbine cogeneration facilities to the Tashkent cogeneration plant in Uzbekistan. At the Tashkent cogeneration plant, each of the facilities is being superannuated, which leads to lowering of operational reliability and increase in cost of repairs. In the project, studied was the introduction of the newest and most powerful gas turbine cogeneration facilities with heat output of 100 Gcal/h equivalent to that of one can of the existing hot water boiler and with generated output of 80MW. As a result of the study, obtained were the energy conservation amount of 83.9 ktoe/y and the greenhouse effect gas reduction amount of 179.7 kt-CO2/y. The initial investment amount was 10.003 billion yen. Expenses vs. effects were 8.39 toe/y-million yen in energy conservation amount and 18.0 t-CO2/y-million yen in greenhouse effect gas reduction amount. In the study of profitability, the internal earning rate was 9.24% after tax, the return yield of capital was 41.26%, and the period of ROI was 16.9 years. (NEDO)

  6. Basic investigation on promotion of joint implementation in fiscal 2000. Energy conservation and modernization plan for Chhatak Cement Co., Ltd.; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chhatak Cement sha shoene, kindaika keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energies and reducing greenhouse gas emission, discussions were given on a modernization plan for the Chhatak cement factory in The People's Republic of Bangladesh. The Chhatak cement factory having a nominal production capability of 267,000 tons a year uses mainly wet-type long kilns of old type, consuming a great amount of natural gas. The present plan has discussed adoption of the Japanese energy saving technologies. The technologies use a vertical roller mill for raw material pulverization, a suspension preheater and a short kiln for clinker sintering, a grate cooler for clinker cooling, and the pre-crushing system. The result of the discussions provided the prospects of reduction in the natural gas consumption at 50%, and reduction of electric power consumption at 16%. This will mean the annual reduction of about 22,000 tons as converted to crude oil. The CO2 reduction amount would reach 51,800 tons a year. The total investment amount would be US$37,327,000. The result of the financial analysis according to the case studies appears severe, wherein reduction of the various expenses is desired possibly by the finance from Japan with generous conditions.(NEDO)

  7. Research report for fiscal 1998. Basic research for the promotion of joint implementation etc. (Ryazanskaya thermal power station modification program); 1998 nendo kyodo jisshi nado suishin kiso chosa Ryazanskaya karyoku hatsudensho kaishu keikaku chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Under study is the modification of the four antiquated 300MW brown coal-fired power plants of the Ryanzanskaya thermal power station. Under the modification program, the plants will be burning a mixture of 60% coal and 40% natural gas for an increase in efficiency and for a great decrease in greenhouse gas emission. The amount of greenhouse gas emission of 6,858,592 tons/year before the modification will be reduced by 19.4% to 5,532,198 ton/year. The budget for the modification will call for 719,731,700 US dollars. EIRR (economical internal rate of return) is calculated based on the figures provided by the Russian office concerned about the current fuel cost and the current rates for the supply of electricity and heat. It is found that EIRR fluctuates depending on the ruble/dollar exchange rate. Although it does not pay at the current exchange rate, yet, when a US dollar is worth 13.0 rubles, an EIRR of 15% will realize at an availability factor of 70%. The same result is obtained when the availability factor is 80% and a US dollar is worth 14.8 rubles. There is a plan to fire the plants with 100% natural gas in the future. If the plan is implemented, a modification to incorporate gas turbine combined cycle will become feasible. (NEDO)

  8. Report on fundamental surveys for such as cases and effects in relation with development of new energy technologies in fiscal 1999; 1999 nendo shin energy gijutsu kaihatsu ni kakawaru jirei koka nado kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper describes the fundamental surveys in fiscal 1999 on cases and effects in relation with development of new energy technologies. Among the projects having been performed by NEDO in commemoration of the 20th anniversary of the NEDO foundation, the economic and social situations in the times in which the projects have been carried out with the focus placed particularly on new energies were put into order and analyzed to make clear the positioning of the project significance in the nation's energy policies. In addition, the roles of NEDO were recognized afresh to use them as the fundamental materials to serve for the future policy development. For the past thirty years before and after the oil crises, the time division that can be used universally for the project evaluation was established, based on the trends inside and outside the country, social currents, related indexes, and the status of development execution. Work hypotheses were presented regarding the basic conception in the evaluation, specific evaluation viewpoints, and their contents. Based on the hypotheses, three subjects were taken up as representative cases, that is, photovoltaic power generation, coal liquefaction, and phosphoric acid type fuel cell technology development. Time points that are considered as the important turning points were specified to give evaluations at respective turning points. Analyses were also made on decision making factors for project planning, continuation, direction change, suspension, and completion. (NEDO)

  9. Basic survey project for joint implementation. Feasibility study for the diffusion of fluidized bed cement kiln system in China; 1998 nendo kyodo jisshi nado suishin kiso chosa. Chugoku ni okeru ryudosho cement kirun fukyu chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Discussions were given on conversion of shaft kilns mainly used at Tianjin Cement and Huaxin Cement to the fluidized bed cement kiln of the most advanced type. Possibility of energy conservation in China, that is reduction of carbon dioxide emission, was evaluated. This system has been developed by the Center for Coal Utilization, Japan. The system is characterized by reduction of greenhouse effect gas emission, elimination of the problem of dust scattering from sintering facilities, stabilized production of high-quality clinker, capability of using low-grade coal and anthracite, and reduction of cement production cost. As a result of the discussions, the reduction rate of greenhouse effect gases was found about 17 to 33%. The cost effect may be calculated as 2 to 5 thousand yen per ton of CO2 reduction amount assuming the system life of 20 years. If this process has been diffused into China, the quantity of CO2 to be reduced will reach about four million tons annually assuming a diffusion rate of 10%. This project shows as high profitability as about 20% at IRR, and the system is more advantageous economically than the shaft kiln. (NEDO)

  10. Report for fiscal 1999 on basic commercialization survey related to geological structure surveys in overseas countries (Kalewa area, Myanmar); 1999 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa (Myanmar Kalewa chiku) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Commercialization survey was performed on the coal beds in the Kalewa area in the Union of Myanmar by means of geological structure surveys. The site surveys included on-the-ground survey, test drilling survey, sample collection and analysis, and infrastructure survey. The on-the-ground survey area spread out about 5.5 km{sup 2}, wherein nine test wells were drilled (for total distance of 2,046.74 m), and coal and rock sample collection and analysis were carried out on six samples. The infrastructure survey was performed on coal transporting roads, and barge loading planned points and facilities. As a result of the test drilling survey, existence of coal beds with thickness of 4 ft, 9 ft and 6ft was identified. Since the 9-ft bed in particular exists stably with inclination of 40 to 42 degrees over the whole subject area, it was made clear that the bed can be the object of mining as the main coal bed. The coal is the ordinary coal with such good qualities as ash content of 4.72%, total sulfur content of 0.22%, and total calorific power of 6,500 to 6,570 kcal/kg. The defined coal quantity for the 9-ft bed is four million tons, or 7.7 million tons in total if the estimated coal quantity is added. The quantity will amount to 15.3 million tons when those of the 4-ft and 6-ft beds are added. (NEDO)

  11. FY 1999 report on the model project on the effective utilization of waste-base biomass fuels. Basic survey for the feasibility; 1999 nendo haikibutsukei biomass nenryo yuko riyo model jigyo jisshi kanosei kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Survey on the waste biomass was conducted for Thailand, Malaysia, Indonesia, Vietnam, Laos, Nepal, Butan, Myanmar and Cambodia to study feasibility of the project for the concrete utilization of biomass resources. In Thailand, it is expected to construct large-scale model plants for biomass resources such as rice hulls, bagasse, wood waste and oil palm. In Malaysia, expected are the cogeneration at 5MW class palm oil plant, large-scale power plant using wood waste, plant using the biomass from waste palm oil, etc. In Indonesia, there is a great potentiality, but it is necessary to handle it carefully in consideration of the unstable situation of the society. In Vietnam, the detailed survey of feasibility is needed on the project for efficiency heightening at state-run plants, the assumed national plants (recommended by the government), etc. In Laos, small-scale power generation using the forestry waste such as sawdust is expected. (NEDO)

  12. Fiscal 1997 survey report. Basic survey on trends of waste use type production facilities and waste fuel production facilities; 1997 nendo chosa hokokusho. Haikibutsu riyogata seizo shisetsu oyobi haikibutsu nenryo seizo shisetsu doko kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This survey was made to obtain the basic data for future spread and promotion of No.6 type (waste use type production facilities) and No.7 type (waste fuel production facilities) which were added to the objects having been subsidized since fiscal 1997 under `the environmental harmony type energy community project.` In the former, the kiln in the cement industry and the blast furnace in the steel industry can be extremely large places to receive waste plastic since the facilities are distributed in every area and the treatment capacity is large. However, the effective collection, transportation and sorting of large quantity of waste plastic, especially the problem of removal of vinyl chloride, is a big bottleneck. As to the use of waste plastic using gasification technology, there are no actual results on the commercial basis. That is, however, appropriate for treatment of the waste difficult in treatment, and can be expected of the usage in the chemical industry. In the latter, in the facilities using industrial waste raw materials as fuel, solidification and liquefaction are both operated on a commercial basis. In relation to the solidification and use as fuel of general waste, the treatment of combustion ash is preventing the expansion of use of waste in the industrial field because of a large quantity of chlorine included in the products. 92 refs., 54 figs., 35 tabs.

  13. Report on the survey in fiscal 1998. Basic survey on promotion of joint project implementation (Khabarovsk thermal power plant modification plan); 1998 nendo chosa hokokusho. Kyodo jisshi nado suishin kiso chosa (Khabarovsk karyoku hatsudensho kaishu keikaku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Discussions were given on the modification plan for Khabarovsk Thermal Power Plant as part of the basic survey on promotion of joint project implementation based on the COP3. The plan calls for shutting down the overaged power plant No. 1 (462.5 MW) and newly building the power plant No. 4 with high efficiency to reduce CO2 emission. The plant will use coal, which is mined extensively in the region. The plant will be a combined heat and power plant with a total power generation output of 576 MW and a total thermal output of 1140 Gcal/h. Effect of reducing CO2 emission as the result of this modification plan will be as much as about 1.2 million tons annually. The plant will use coal as fuel in the beginning, but if it uses natural gas in the future, for which pipeline construction from Sakhalin has been planned recently, the CO2 emission reducing effect will reach 2.4 million tons. Internal profitability was calculated with the CO2 price set at zero US dollars and with the foreign exchange rate varied, for a case of firing coal for 30 years. The profitability may vary largely according to the foreign exchange level, such as profit rate of 5.47% at 20 roubles to a US dollar, 11.04% at 12 roubles, and 21.22% at 6 roubles. The profitability should be judged somewhat low under the current exchange rate of 20 roubles to a dollar. Financial provision with a favorable condition is strongly desired. (NEDO)

  14. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Rehabilitation of ICE/SAN ANTONIO power plant; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. ICE/SAN ANTONIO hatsudensho rihabiri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Costa Rica takes a power generation system using hydro power generation as the main source, and possesses medium-capacity gas turbines to supplement needs in the dry season and the peak load. However, a problem has come up that, in addition to the cost rise in gas turbine fuel, the power generation efficiency has been aggravating due to aged deterioration of the generators being used. In association therewith, the problem is now a factor to increase CO2 emission, which is a worldwide problem. Keeping in mind to link it to the clean development mechanism (CDM), the present project is, taking up the SAN ANTONIO power plant as the investigation object, intended to perform a comprehensive discussion on the CO2 emission reducing effect, profitability, and proliferation effect, by executing the conceptual plant design. The up-grading plan for thermal power generation systems in Costa Rica consists of replacement of the gas turbines, handling of phase modifiers, and achievement of the combined cycle. The plan agrees with the present feasibility study intended of CO2 emission reduction, consisting of the modification plan of the SAN ANTONIO power plant, that is the plan to replace the over-aged gas turbines at the power plant. Its necessity has been identified. It was disclosed that the project has the effects of reducing CO2 of 82,000 tons annually, and the investment can be recovered in nine years. (NEDO)

  15. Basic investigation on promotion of joint implementation in fiscal 2000. Modernization project for North Bangkok Thermal Power Plant in Thailand; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Tai North Bangkok karyoku hatsusensho kindaika jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, a modernization project has been discussed on the North Bangkok heavy oil burning thermal power plant owned by Electricity Generating Authority of Thailand (EGAT). The present project plans to withdraw the existing units No. 1, 2 and 3, and install two new generating facilities with the rated output of 358.3 MW using natural gas as fuel. The present feasibility survey has performed detailed comparative discussions on four cases, whereas a proposal was selected to withdraw all of the boilers, steam turbines, and generators, and install two single axis combined cycle systems whose output has been increased by using the existing fuel tank area. The energy saving effect by this project can reduce fuel consumption annually by 514 kt of crude oil equivalent. The greenhouse gas can be reduced annually by 2,680 kt-CO2. The project will require a total fund of about 57 billion yen. The profitability assessment calls for the internal profitability of 8.413% and the investment fund efficiency of 1.69%. The economic investment payback effect of this project is determined sufficient. (NEDO)

  16. Report on FY 1998 project for international energy utilization rationalization, etc. (Project of the analytical tool survey for making energy consumption effective in Asia); 1998 nendo chosa hokokusho. Kokusai energy shiyo gorika nado taisaku jigyo (Asia energy shohi koritsuka bunseki tool chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In the Asian region, for the purpose of grasping effects of both economic growth and effective energy consumption, an analytical tool added with a computational function was developed with the interindustrial relations table as database for the analysis of the present situation and the simulational analysis. In the analysis of the present situation, changes between the two time-points, 1985 and 1990, were analyzed using the developed energy consumption table and the CO2 emission table. The energy consumption amount is increasing with the growing economy. However, the energy unit consumption is decreasing in countries except Korea, the Philippines, Singapore and Malaysia. The trend is that the energy consumption is becoming effective and the CO2 emission amount is decreasing. As an example of simulating the introduction effect of energy saving technology, the simulation was conducted on the three: iron steel, paper/pulp, and cement in Indonesia. As a result, the decrease in energy consumption was shown in paper/pulp by 48%, in cement by 16%, and in iron/steel by 16%. The same was also indicated in CO2 emission. (NEDO)

  17. Fiscal 1999 survey report on basic feasibility in implementing model project for efficient consumption of energy by fiber dyeing and processing plant in Indonesia; 1999 nendo Indonesia ni okeru senshoku kako kojo energy shohi koritsuka model jigyo kihonteki jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The basic feasibility of a model project was investigated for the purpose of introducing energy saving technology in dyeing and processing by the textile industry, which consumes a great deal of energy in Indonesia. This paper explains the result of fiscal 1999. A questionnaire survey was conducted on 40 companies having a continuous processing plant from spinning to finishing, while seven companies among them were visited for the survey on the status of energy consumption and conservation. Meantime, a survey was also made on the related policies and the state of their implementation in Indonesia as well as on the status of investment on equipment. As energy saving measures for the processing, proposals were made for energy saving in the washing process (exhaust-heat recovery system, monitoring system, and optimization of steam usage in drying process), for introduction of a heat pump system, and for reduced energy consumption in a jet dyeing machine. As energy conservation measures for utilities, reduced energy consumption of boilers was proposed, as was introduction of co-generation system. Essential for the dissemination of the measures are guidance, enlightenment and mentality reform for the entrepreneurs. Needed for the policy are the establishment of a core organization for energy conservation, plans, analyses, model projects, and introduction of an economic support system (e.g., low-interest loan). (NEDO)

  18. Report on achievements in fiscal 1999 on international model project for energy consumption efficiency improvement. 'Model project to enhance boiler and turbine efficiency'; 1999 nendo kokusai energy shohi koritsuka tou moderu jigyo seika hokoku. Boira gasu tabin koritsu kojo moderu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective to save energy, reduce electric power generation cost, and reduce CO2 exhaust in Indonesia, the Japanese energy saving technologies were transferred to the Muara-Karang Power Station in Indonesia as the object of the project. This paper reports the achievement in fiscal 1999. The target was set to reducing the power generation unit requirement (heat consumption ratio, kcal/kWh) by 1% by improving such constitutional devices as water condensers and air pre-heaters. Further improvements were planned by introducing the thermal efficiency control program. The subject fiscal year has performed data acquisition from the site surveys, investigations on related technologies, and detailed designs for site construction and effect identification. Also having been carried out based on the result of the detailed designs was partial fabrication of members and parts necessary for facility modification such as for small tubes for water condensers made of new materials. Furthermore, the Indonesian engineers were accepted for the purpose of transferring the thermal efficiency management methods, and the maintenance and control technologies for devices being the objects of the facility modification related to the boiler and turbine efficiency improvement. (NEDO)

  19. Achievement report for fiscal 1998. Energy consumption efficiency improvement model business for developing nations (Demonstration research project on new cooling system in cement clinker production); Hatten tojokoku energy shohi koritsuka model jigyo seika hokokusho. Cement clinker reikyaku sochi ni kakawaru jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The project aims at energy saving and CO2 emission reduction for a clinker cooling system (CCS), and a demonstration test was conducted at a demonstration cement plant in Indonesia. The plant started operation using the new CCS aiming for the enhancement of cooling and heat recovery efficiency. The actually achieved heat recovery efficiency attributable to the adoption of the new CCS was 60.8% against the target of 68%, this meaning an improvement of 8% over the value recorded prior to the new CCS adoption. As for increase in recovered heat due to heat recovery efficiency improvement of the CCS itself, it was 31kcal/kg-clinker. The heat reduction rate throughout the system thanks to the new CCS was 40kcal/kg-clinker. The kiln secondary air temperature increased for improved burner combustion performance for a rise of the clinker burning degree to 12kcal/kg in terms of calorie, and thus a reduction of 52kcal/kg-clinker in total was achieved. No mechanical trouble was reported with the new CCS. Investigations were conducted into cement supply/demand and technological trends in Indonesia, Vietnam, and China. Learnings from the investigation of German cement making technologies were fully utilized in the designing of the new system. (NEDO)

  20. Report on achievements in fiscal 1996. International energy usage rationalization project (project to survey energy consumption efficiency improvement analyzing tools for Asia/data edition); 1996 nendo kokusai energy shiyo gorika taisaku jigyo chosa hokokusho shiryohen. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This paper is a collection of data on surveys for energy consumption efficiency improvement, taking Japan, Korea, Indonesia, Thailand, and Philippines as the object countries. I. Industry related various value tables consist of the following: basic transaction table, throw-in coefficient table, final demand converter table, import coefficient table, added value coefficient table, inverse matrix coefficient table, sensitivity coefficient table, influence coefficient table, production inducing amount, production induction dependence, import inducing amount, import induction coefficient, import induction dependence, and inverse matrix coefficient table. II. Energy related various coefficient tables consist of the following: inherent unit quantity table, energy consumption table, CO2 table (1), CO2 table (2), unit requirement table, energy consumption induction table, energy consumption induction coefficient table, energy consumption induction dependence table, CO2 induction table (1), CO2 induction coefficient table (1), CO2 induction dependence table (1), CO2 induction table (2), CO2 induction coefficient table (2), and CO2 induction dependence table (2). Industries are classified into 34 kinds. III. The energy consumption table, CO2 table (1) and CO2 table (2) are shown as the simulation results for the four countries: Korea, Indonesia, Thailand, and Philippines. (NEDO)

  1. Report on evaluation of research and development of methods for producing basic chemicals from carbon monoxide and other stocks; Issanka tanso nado wo genryo to suru kiso kagakuhin no seizoho no kenkyu kaihatsu ni kansuru hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-08-01

    This project was aimed at developing methods for producing basic chemicals from carbon monoxide and other stocks (the so-called C1 chemistry), in order to establish the techniques that could promote stable supply of basic chemicals from the new carbon resources in place of oil. It was a 7-year national project beginning in FY 1980, jointly implemented by the government, academic and industrial circles. Described herein are the overall evaluation of the results. There are several carbon resources other than oil, e.g., coal, natural gas, oil shale and tar sand. They are abundantly occurring, although unevenly, and various countries are developing these resources. They can be advantageously utilized as stocks for chemicals, after being converted into synthesis gases. In Japan, they have been efficiently developed cooperatively by national institutes, enterprises, academic circles and chemical industry, to produce the world's results, e.g., gas separation/purification techniques and new catalysts for new synthesis methods. This project was terminated because of the relaxed oil supply/demand situations and lowered crude prices in the middle of the 80's, which made stock conversion less urgent. (NEDO)

  2. Fiscal 1999 research report. Basic research on joint implementations promotion (Feasibility study of modification for Tehran Cement Co., Ltd., Iran); 1999 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Iran koku Teheran cement sha kaizo F/S

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The feasibility study was started upon a request made by the Iranian Ministry of Energy involving the No. 7 kiln of the above said company. It was then concluded, after assessing the degree of urgency of supply and demand and the magnitude of loss due to reduced production because of the on-site modification work, that it was not practical to begin the project immediately. Under the circumstances, various studies were made about the feasibility of modification of the whole production process of the No. 1 kiln through No. 7 kiln, and a procedure was presented, to be described below. The procedure will consist of Phase I wherein the No. 3 wet kiln is converted into an NSP (new suspension preheater) dry kiln, Phase II wherein the No. 7 SP (suspension preheater) dry kiln is converted in to an NSP kiln, and Phase III wherein the No. 4 SP dry kiln is converted into a clinker cooler. Under this procedure, the modernization of the Tehran Cement Co., Ltd., facilities will be accomplished without causing production loss. After the completion of the project, an annual yield of 3.6-million tons will be achieved, with productivity to be improved by 26.4% over the current theoretical capacity or by 54.8% over the actual average for the past 5 years. There will be a sustained conservation of 25,356 tons/year in terms of oil. Application of CDM (clean development mechanism) to this project will be extremely effective in reducing greenhouse gas and in improving profitability. (NEDO)

  3. FY 2000 report on the basic survey to promote the joint implementation. Project on the repair of the Bobovdol thermal power plant, Bulgaria; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bobovdol karyoku hatsudensho kaishu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As to the Bobovdol thermal power plant, Bulgaria, a plan for repair of power plant was worked out with the aim of energy conservation and greenhouse effect gas emissions, and the results of the feasibility study were reported. The existing power plant, 3 x 210MW unit, totals 630MW, approximately 130,000 hours in cumulative operation hour. In the repair plan, the plant is replaced with high efficiency gas combined cycle power generation facilities based on gas turbines by scrap and build. In the plan, the repair of existing units Nos. 1 and 2 for life elongation is urgently conducted, and new facilities are to be built every 5 years. As a result of the study, the energy conservation effect will be reduced by 16.37 million toe tons in 41 years after the repair, and the CO2 emission will be reduced by 105.18 million tons in 41 years after the repair. As to the profitability, the internal economical profitability is 5.66% in case of setting the CO2 emission trade at zero. This is the level on which the project is barely profitable by soft loans raised by Japan Bank for International Cooperation (JBIC), etc. (NEDO)

  4. Report on evaluation of research and development of methods for producing basic chemicals from carbon monoxide and other stocks; Issanka tanso nado wo genryo to suru kiso kagakuhin no seizoho no kenkyu kaihatsu ni kansuru hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-08-01

    This project was aimed at developing methods for producing basic chemicals from carbon monoxide and other stocks (the so-called C1 chemistry), in order to establish the techniques that could promote stable supply of basic chemicals from the new carbon resources in place of oil. It was a 7-year national project beginning in FY 1980, jointly implemented by the government, academic and industrial circles. Described herein are the overall evaluation of the results. There are several carbon resources other than oil, e.g., coal, natural gas, oil shale and tar sand. They are abundantly occurring, although unevenly, and various countries are developing these resources. They can be advantageously utilized as stocks for chemicals, after being converted into synthesis gases. In Japan, they have been efficiently developed cooperatively by national institutes, enterprises, academic circles and chemical industry, to produce the world's results, e.g., gas separation/purification techniques and new catalysts for new synthesis methods. This project was terminated because of the relaxed oil supply/demand situations and lowered crude prices in the middle of the 80's, which made stock conversion less urgent. (NEDO)

  5. FY 2000 report on the basic survey to promote Joint Implementation, etc. Upgrading of energy utilization in the cement production process; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Cement seizo kotei ni okeru energy kodoka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was conducted of a project for energy conservation and greenhouse effect gas reduction by introducing the steam injection gas turbine generator to production facilities of the Siam Cement Industry Corporation (SCI) in Thailand. In the project, studies were made on the following: no purchases of electric power by introduction of the steam injection gas turbine generator; additional heating by gas turbine exhaust gas by introduction of the kiln combustion air heater; remodeling of the preheater of raw materials, and the partial calcination before kiln sintering by introduction of the calcination furnace. As a result of the study, the energy conservation amount was 1,200 toe/y, and the greenhouse effect gas reduction amount was approximately 8,000 t-CO2/y, which led to the reserve power for increased production of clinker by about 18%. The size of investment was 314.5 million Baht in total. As to the evaluation of economical efficiency of the investment, the actual period of ROI was a little less than 5 years, and the internal earning rate was 17.7%, which substantially met with SCI's standards for equipment investment. However, there are problems on the gas supply infrastructure, recovery of the white cement demand, etc. (NEDO)

  6. Primary production and calculation in coral reefs. 1st Report. ; Theoretical consideration on changes of CO2 system in seawater. Sangosho seibutsu gunshu no kiso seisanryoku to sekkaika. 1. ; Kaisuichu no tansankei hendo ni kansuru rironteki kosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, K [Japan Marine Science and Technology Center, Kanagawa (Japan)

    1993-09-30

    This paper describes an algorithm for calculating the equilibrium state of carbonate system in seawater. The photo-synthesis, respiration, and basic production ability of organic and inorganic carbon compounds by calcification of coral reef ecosystem and the change in carbonate system in seawater were discussed. The carbonate system in seawater can be estimated by determining two variables among the four variables, i.e., pH value, total carbonate, total alkalinity, and partial pressure of carbon dioxide (PCO2). The analysis program proved to give good agreement with the previously calculated results. In the inorganic production of carbonate in seawater, one mole of carbonate precipitation liberates approximately 0.6 mole of CO2 into the air, and the pH value shifts toward acid side. The experimental value (0.55) for production speed ratio of inorganic carbon to organic carbon in the seawater where the coral family is abundant brings about the increase of the organic carbon production, resulting in the decrease in PCO2 in seawater and the increase in pH value. It is assumed that it becomes of a sink of CO2 in the atmosphere. 23 refs., 3 figs., 7 tabs.

  7. Report on the FY 1993 basic survey for industrialization related to the survey of overseas geological structure (Tebulan East area, Malaysia); 1993 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa (Malaysia Tebulan higashi chiku) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The survey was conducted based on 'Scope of work for detailed coal exploration in the Tebulan East block of the Merit Pila coal field, Sarawak, Malaysia' concluded on June 19, 1993 between NEDO and Global Mineral which owns the mining right. The field survey was for the geological survey, survey of conditions of open pit mining, and infrastructure survey. The confirmed/estimated coal amount totaled 22,65 million tons in 4 coal seams. The all sulfur content is low, approximately 0.12%. The heating value is 5,820 kcal/kg. As to the infrastructure, various conditions are good for transportation, shipping facilities, etc. from mine site to truck transport/barge transport/external route shipping. The drilling was planned to be made by open pit mining by the truck and shovel system, and the scale of the planned production was 0.3 million tons. The ash is low in amount, and there was no coal preparation. Clean coal is produced by crushing, sieving and washing. Attached were the borehole log (JN9940782), route map, and trench sketch (JN9940783). (NEDO)

  8. Report on the FY 1992 basic survey for industrialization related to the survey of overseas geological structure (Embalut West area, Indonesia); 1996 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa hokokusho (Indonesia Embalut nishi chiku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The paper reported the FY 1992 basic survey for the coal mine development/industrialization in the Embalut West area of Indonesia. The geological structure in the survey area is under the Loa Haur Syncline which lies approximately north and south to the west of the area, and is regarded as the stabilized structure having no faults. The three beams from the upper part, S14, S13 and S12, are assumed to be the coal seams to be drilled. The average seam thickness is 1.17, 2.35 and 3.09m, respectively, and the continuity is good. In S14 beam, which is thin, it is difficult to mine coal using equipment. The theoretical minable reserve of the three coal seams is 18,859,000 tons. The recoverable coal reserve is 12,258,000 tons at a mining recovery of 65%. In case of annual production of 0.4 million tons, it is possible to mine more than 30 years. The coal is classified into a subbituminous coal-brown coal rank of the JIS coal classification. It is high in water content and medium in heating value, but is an environmental protection type with low ash and low sulfur content. In the case of mines in the Mahakam River basin, barge transport is indispensable. For sea transportation, the following should be studied in the light of the international price competition: reinforcement of shipping facilities on Mahakam River, increase in barge size, joint use of Balikpapan Coal Center, etc. (NEDO)

  9. Report for fiscal 2000 on surveys on foundation to establish industrial technology strategy. Surveys on foundation to assist activation of research and development; 2000 nendo sangyo gijutsu senryaku sakutei kiban chosa hokokusho. Kenkyu kaihatsu kasseika shien kiso chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In order to help discuss the measures to activate researches and developments in private corporations, surveys were made on barriers and factors related to industrial technology research and development by fields, and discussions were given on structuring research and development models. Factors impeding research and development processes relate to a case of each phase in the fundamental research, applied research, and product development, and a case of human resources, funds and information. A policy of structuring models was determined to make quantitative the effects of different aiding systems of the government for researches and developments in private corporations. Case analyses were conducted by using a pilot model. In the present research, a questionnaire survey was carried out to acquire such data as R and D time lag, and to identify the effects of the policies. Surveys were also performed on research and development programs in North America, by making interviews to concerned corporations. As a result of the surveys, such problems were extracted as research and development fund, freer flow of human resources, research and development systems, handling of results of researches performed by consortiums, accounting systems, and sale of the government owned patents. (NEDO)

  10. Basic investigation on promotion of joint implementation in fiscal 2000. Efficiency improvement project for gas turbine power plant in Iran; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Iran gas turbine hatsuden plant no koritsu kaizen project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions have been given on measures to improve energy conservation and efficiency at a power plant of Kish Water and Power Company (KWPC) in Iran. The site has high ambient temperature throughout a year, making the gas turbine power plant capable of generating power only at about 70% of the rated output, with the power generation efficiency decreasing. The project has analyzed the current situation at the plant, and evaluated different means that appear effective in improving the efficiency, including the gas turbine absorbed air cooling system, the steam injection system, and the combined cycle. As a result of the discussions, it was revealed that energy saving effect can be obtained at 145 TJ with the gas turbine absorbed air cooling system, 224 TJ with the steam injection system, and 1017 TJ with the combined cycle. The annual reduction of greenhouse gas emission due to the above energy conservation would be about 11 thousand tons, 16.5 thousand tons, and 75 thousand tons, respectively. However, the investment payback period would be about 2.45 years, 8.31 years, and 14.21 years, respectively. Therefore, the profitability does not appear very attractive because of low fuel unit cost. (NEDO)

  11. Report on a commercialization fundamental investigation (in Batulicin Area, Indonesia) in relation to FY 1997 investigations on geological structures in overseas countries; 1997 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa (Indonesia Batulicin chiku) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    A fundamental coal mine development investigation was carried out in Batulicin Area, Kalimantan, the Republic of Indonesia. The investigation included ground surface surveys, preparation of topographical maps and geological maps, trial drilling investigation, physical logging, chemical analysis, and infrastructure investigation. The trial drilling investigation was intended to identify the existence conditions of coal beds and coal quality, and was performed by forming grids with about 500-meter interval, and using 21 trial drillings to depths of 104 to 240 meters for a total drilling length of 3463 meters. The physical logging included electric logging, radioactivity logging and pore size logging, and the trial drilling cores were subjected to chemical analysis. For infrastructures, investigations were carried out on necessity of modifying existing roads, privilege relationship, the current status of barge loading points, water depths, and land acquisition. The result of the investigation revealed that minable coal quantity in underground mining of the coal bed B would be 13.189 million tons, and that annual production of original coal at 733,000 tons would be possible by adopting a long-wall type mechanized coal mining system. 14 refs., 99 figs., 25 tabs.

  12. FY 1999 report on the study of the future course, etc. of 'the basic survey for promotion of Joint Implementation, etc.'; 1999 nendo 'kyodo jisshi nado suishin kiso chosa' no kongo no hokosei nado ni kansuru kento chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper conducted the demonstration of the multiplier effect of 'the model project for heightening of the international energy consumption efficiency, etc.' carried out by NEDO and its subsidiary project, 'the project on the basic survey for promotion of Joint Implementation (JI),' and the comparative study between these projects and the JI/CDM projects proposed in the world. In the quantitative evaluation of the multiplier effect, in the case of making the demonstration of the same technology in the same area both in the model project and the basic survey for promotion of JI, it becomes possible to grasp the CO2 reduction effect with high accuracy, but the CO2 reducible amount is small. Inversely, as to the technology for which the basic survey for promotion of JI is studied, but the model project is not carried out, it becomes possible to grasp the CO2 reduction effect with low accuracy, the CO2 reducible amount is large. In the comparison with the JI/CDM projects proposed in the world, the CO2 reduction amount was approximately $2.7 billion, 250 million tons, in the UNFCCC project, and approximately $5.0 billion, 500 million tons, in the IJ project. There was no very big difference in the cost effect. (NEDO)

  13. Fiscal 2000 report on financially supported geological structure survey overseas. Basic survey for coal resource exploitation (Research on underground probing technology); 2000 nendo kaigai chishitsu kozo chosahi nado hojokin (sekitan shigen kaihatsu kiso chosa) konai tansa gijutsu chosa hokokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the work of searching for coal beds, comparison is made between the geological structure of the object area, which is predicted, before actual investigation, by a close scrutiny of the result of oceanic pilot boring conducted in the past, result of geophysical exploration, and the geological features of galleries already in presence in the vicinity, and the result obtained from galleries drilled actually for the investigation. The investigation was conducted at the Ikeshima coal mine, Nagasaki Prefecture. In this fiscal year, 5 investigation galleries were drilled, totalling 1640m in length, and, in the mine, geological surveys, survey and measurement, coal quality evaluation, water emergence investigation, boring for coal, etc., were carried out. Comparison was made, and, though in the 2nd Minami No. 06 air duct there was no important difference detected between the prediction and the actual result, some faults were found to exist which had not been predicted by seismic exploration on the ocean. In the 2nd Minami No. 5 air duct, the actual geology was not different from the predicted geology, this endorsing the usefulness of boring for coal. In the 2nd Minami No. 01 gallery, direction and inclination were not greatly different from what had been predicted, but some faults which had not been predicted were discovered. These faults had escaped the scrutiny of neighboring coal beds and pilot boring. (NEDO)

  14. Fiscal 1999 report on basic research for promotion of joint implementation programs. Basic research on introduction of energy saving facilities into Bulgaria's Kremikovtzi Steelworks; 1999 nendo Bulgaria Kremikovtzi seitetsusho no sho energy setsubi donyu kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The plant undergoes a survey for higher energy efficiency, pursuant to the COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) protocol. Dry quenching and coal moisture control are investigated for the coke oven; exhaust heat recovery and high efficiency ignition burner for the sintering machine; top pressure recovery power generation and hot stove exhaust heat recovery for blast furnace; gas recovery for the converter; scrap preheating for the electric furnace; continuous casting and soaking pit efficiency improvement for the blooming process; hot charge and heating furnace efficiency improvement for the hot strip mill reheating furnace; and furnace efficiency improvement and hydrogen annealing applicability for the annealing furnace. The energy saving effects of the above are calculated under conditions that one more of the same be added to the continuous slab casting unit and that a continuous bloom casting unit be constructed for the continuous casting of the whole, and that hydrogen annealing be adopted. A reduction of 141,900toe/year is to be achieved, which occupies 6% of the energy consumption of the whole steelworks. A greenhouse gas reduction of 333,600t-CO2/year is feasible. Now that privatization is under way for business reconstruction and rationalization, suggestions will be presented in consideration of the order of priority of investment recovery effects with attention paid to the privation program. (NEDO)

  15. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Effective utilization of associated gas as CNG; 2000 nendo kyodo jisshi nado kiso chosa hokokusho. Zuihan gas no CNG to shite no yuko riyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The Back Ho oilfield is the largest oilfield in Vietnam and at the same time is producing the largest amount of natural gas (associated gas) in Vietnam. Although the majority of the associated gas has been used in the power generation plant, a large amount of surplus gas is not effectively used because of shortage of fund and technologies. Accordingly, a feasibility study has been executed for a project to compress 20% of the associated gas into CNG, and use it effectively as automobile and factory fuel. As a result of the site survey, it was found that, although Vietnam consumes less amount of energy and emits less amount of CO2, the nation has a strong interest and a large amount of knowledge about global warming and CDM because the country is subjected to large effect of warming. Furthermore, it has been reconfirmed that introducing CNG into this territory is highly effective. Discussions have been made on places of installing the facilities, effective surplus gas utilization systems, facility specifications, utilities, and number of workers. Calculations were made on approximate cost of the facilities and the running cost. As a result of the surveys and discussions, it was determined that technological support from Japan and the Yen loan for environment with low interest rate are necessary. (NEDO)

  16. Report on fiscal 2000 basic survey for coal resource exploration. Survey for development of new exploration technology (Exploration of shallow layers on the land); 2000 nendo sekitan shigen kaihatsu kiso chosa hokokusho. Shintansa gijutsu chosa kaihatsu (rikuiki senso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    Efforts are made to develop a high-precision high-resolution seismic reflection method, high-efficiency method for measurement in the bored hole, coal potentiality assessment system, and so forth. For the development of the seismic reflection method, studies are conducted to properly deal with a situation where there are high-velocity layers at levels shallower than the object coal bed, and a conclusion is reached that quake generation based on the pseudorandom binary sequence code will be the best for the purpose. The system was tested for verification in a producing coal mine. As for measurement in the bored hole, an on-site test was conducted for a geophysical logging system capable of determining the total sulfur content, ash, and the like, and the system was found to supply high-quality data. In developing the coal potentiality assessment system, studies were made about the basic concept of the coordination of the system with the coal GIS (geographical information system) dealing with spatial data and about the functions of the system, and a conceptual design was prepared. (NEDO)

  17. Fiscal 2000 survey report. Foundation building project for international energy use rationalization. Master plan preparation for rationalized energy use; 2000 nendo kokusai energy shiyo gorika kiso seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For energy conservation and environmental protection using technologies for effective consumption of energy and for preventing pollution due to energy consumption, master plans were studied and prepared on photovoltaic power generation, wind power generation, natural gas utilization, and so on, for the Xinjiang Uygur Zizhiqu, Gansu Province, and Guandong Province, respectively. Propositions addressing the Xinjiang Uygur Zizhiqu involved a decrease in dependence on coal, utilization of natural gas, introduction of coal-fired cogeneration systems, introduction of wind power up to the level equivalent to the supply reserve capability, energy conversion and new industry development using natural gas, promotion of electrification of local communities, and so on. Propositions addressing Gansu Province involved the hydroelectric power system as the core of power sources, decrease in dependence on coal, enhanced utilization of natural gas, energy conversion and new industry development utilizing natural gas, and so on. Propositions addressing Guangdong Province involved a decrease in dependence on coal and oil, enhanced utilization of natural gas, introduction of natural gas-fired combined cycle power generation into urban sectors, accelerated utilization of wind power generation on isolated islands, and so on. (NEDO)

  18. FY 1998 basic survey to promote the joint execution, etc. Overall repair plan of thermal power plants in Maritime Province of Russia; 1998 nendo kyodo jisshi nado suishin kiso chosa. Roshia Enkaishu ni okeru karyoku hatsudensho sogo kaishu keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For thermal power plants in Maritime Province of Russia, a repair plan for effective reduction of emission of greenhouse effect gas was worked out as a draft plan for the joint execution. The project is to be implemented for the additional installation/replacement of boilers at Vladivostok No. 2 power plant, construction of a power plant as a substitute for Partizansk power plant, and new construction of Ussuriisk power plant. The draft plan includes the new installation of two gas-fired boilers/replacement of existing boilers at Vladivostok No. 2 power plant, construction of 200MW cogeneration facility at Partizansk power plant, construction of 180MW cogeneration facility at Ussuriisk power plant, abolition of small-sized boiler station, etc. The reduction amount of the greenhouse effect gas emission based on this repair plan totaled 338 million tons in project. The effect against cost is US$ 4.75 per 1 CO2 ton at Vladivostok. (NEDO)

  19. Report on fundamental survey on developing coal resources in fiscal 1999. Survey and development of new exploration technology (exploration of shallow land area beds); 1999 nendo sekitan shigen kaihatsu kiso chosa hokokusho. Shintansa gijutsu chosa kaihatsu (rikuiki senso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper describes the survey and development of new coal exploration technology applied in the NSW State of Australia. It is intended to develop a coal resource assessment method with high accuracy using the reflection method seismic exploration, assisted by other physical exploration methods. The Caroona area has a Permian period ground bed distributed, in which multiple number of coal layers exist. The ground bed is covered with sedimentary layers of the Triassic period inconsistently, and this Triassic period system is covered by volcanic rocks of the Jurassic period inconsistently. Faults are going through the coal beds in their upper or lower layers at locations having soft rock beds. Existence of the faults was estimated by seismic exploration using the two-dimensional reflection method, assisted by the result of the physical logging. The results were unified with the result of test drilling to identify the summary of the latent basset lines. Furthermore, the seismic exploration using the three-dimensional reflective method capable of high-level imaging of underground structures was applied to coal beds existing in depths less than 480 m. Multiple number of local and small-scale sinking were detected with time difference of 5 ms and depth conversion to 7 m. Locations, runs, and inclination were interpreted also on faults having small fall which cannot be detected by the two-dimensional method. The three-dimensional method was found capable of identifying micro structural changes and fault runs that cannot be tracked by the two-dimensional method. (NEDO)

  20. Basic investigation on promotion of joint implementation in fiscal 2000. Feasibility survey on conservation of energy and reduction of warming gas emission; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Seitogyo no sho energy oyobi ondanka gas sakugen kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Upon the request from the Ministry of Agriculture of the Polish Government, a survey has been performed on three sugar production factories (Lesmierz, Lapy and Werbkowice) in Poland in relation with conservation of energy and reduction of warming gas emission. The survey has been made from the following two aspects: improvement of energy utilization efficiency in the sugar production processes, and efficiency improvement and fuel conversion in the boilers being the energy supplying source. As a result of the discussions on the sugar production process improvement, annual fuel conservation of 304,495 GJ (or 12,688 tons as converted to coal) in total for the three factories, or the energy saving rate of 28% was obtained. Regarding the greenhouse gas emission, an effect of reducing 25,235 tons, or a reduction rate of 27% was achieved. In the combination of the sugar production process improvement and the boiler improvement, the fuel conservation will be 18,363 tons as converted into coal, and the reduction of the greenhouse gas emission will be 56,107 tons. However, when based on the present coal price and natural gas price, the improvement efforts will not be realizable economically for both of Lesmierz and Werbkowice factories, hence comprehensive judgment is required from the viewpoint of the fuel price and environment preservation expense in the future. (NEDO)

  1. Basic investigation on promotion of joint implementation in fiscal 2000. Survey on energy saving and CO2 emission reduction in Cilacap Refinery; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Cilacap seiyusho ni okeru shoene CO2 sakugen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, a basic survey has been performed on the atmospheric crude oil distillation units and the high vacuum distillation units at Cilacap Refinery in Indonesia. The first site survey in September 2000 has carried out a survey on the situation of the facilities and operation upon obtaining the facility data and operation information from Pertamina. As a result, it was revealed that there is a room of improvement in the heat recovery, whereas a modification design was executed on the improvement proposals on the heat exchanger system. However, the second site survey in November 2000 has revealed that Pertamina had executed in 1998 through 1999 the de-bottlenecking project on the crude oil atmospheric distillation units (two units) and the high vacuum distillation units (two units), by which the capability has been expanded, and the heat recovery rate has been increased. It is not possible to look for extremely large enhancement of the heat recovery rate beyond that point, and the reduction of CO2 emission would also be small. As a result of discussions, the present project was found capable of reducing annually the CO2 emission by 36,500 tons. (NEDO)

  2. FY 2000 report on the basic survey to promote the joint implementation. Conversion of raw materials in fertilizer plants and energy conservation in India; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Indo hiryo plant genryo tenkan to shoene

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As a project contributing to reduction in greenhouse effect gas emissions by introducing energy conservation technology of Japan to India and to sustainable economic development in India, study of 'conversion of raw materials in fertilizer plants in India' was made, and the results were reported. The Indian government has been controlling the retail price of fertilizer by the subsidy policy for the protection of the domestic fertilizer production. Therefore, plants, which use coal/heavy oil/naphtha with much greenhouse gas emission as raw materials, have been behind improvement and now have no competitive force in the international market. In this project, concerning ZIL's fertilizer plant, the ammonia production capacity was set at 750 t/d and the urea production capacity at 1,300 t/d, and the energy conservation technology and the conversion of raw materials from naphtha to natural gas were studied. As a result, the amount of energy conservation was 55,705 toe/y, and the amount of CO2 reduction was 245,139 t-CO2/y. Further, this project indicated that profits were expected to increase and the cash flow would change for the better. (NEDO)

  3. Report on a fiscal 1995 basic survey of the environmental engineering. Investigational survey on the improvement of the waste treatment system; 1995 nendo kankyo business no engineering ka kiso chosa hokokusho. Haikibutsu shori system no kodoka ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The paper described the present situation of the waste treatment system for the environmental engineering and the problems. The final waste treatment plants are in the tighter and tighter condition, and therefore the waste treatment system ought to be changed to a system in which importance is placed on the size reduction, weight reduction, and recycle. Accordingly, the waste treatment system becomes more characterized as a resource feedback process, and should be given more credit as a system for production of secondary resource. The problem is arrangement of conditions of technology, cost and legislation system for smoothing such recycling flow. Of course, it is natural that the most important subject of the system is to secure the environmental preservation by the waste treatment. As future subjects, needed are understanding of the waste treatment as a resource reproductive system, relation with other industries, and review of the legislation system. In consideration of technology, cost and environmental loads, required are proposal of validity of the recycle level limit and a future image of the system structure, and policies for promoting and supporting the recycle business. 47 figs., 104 tabs.

  4. Research report for fiscal 1988. Basic research for the promotion of joint implementation etc. (plan for using combined cycle at Konakovo Power Station, Russia); 1998 nendo kyodo jisshi nado suishin kiso chosa. Roshia renpo KONAKOVO hatsudensho combined cycle ka keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    On the basis of Kyoto Protocol-provided flexible measures such as joint implementation and clean development mechanisms, a study is conducted for introducing combined cycle into Konakovo Power Plant of Russia currently equipped with antiquated eight 300MW power plants constructed in the 1960's for which early renovation is necessary. The power station is an important power source connecting to the Moscow-Petersburg main. The gas turbine combined facilities to be newly installed will comprise 250MW-class state-of-the-art gas turbines arranged in four blocks, capable of a total output of 1600MW at a thermal efficiency of 58% (with simultaneous supply of heat). Four units capable of 1200MW out of the existing units will stay in operation for load adjusting. Since the price of power is set low under government control, the accounting capital/internal return rate is as low as 2.3%. The rate recalculated under the financing conditions of special yen credit for environmental protection, however, is as high as 19%, so high as to make the renovation an economically feasible project. It is expected that there will be an annual CO2 reduction of 2.3-million tons or a reduction of 57.50-million tons in 25 years (the life span of the new facilities). The renovation may be a joint implementation project to which both Japan and Russia will attach the highest priority. (NEDO)

  5. Summarized report on fiscal 2000 basic survey for coal resource exploration. Survey for development of new exploration technology (Exploration of shallow layers on the land); 2000 nendo sekitan shigen kaihatsu kiso chosa hokokusho (yoyakuban). Shintansa gijutsu chosa kaihatsu (rikuiki senso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    Efforts are made to develop a high-precision high-resolution seismic reflection method, high-efficiency method for measurement in the bored hole, coal potentiality assessment system, and so forth. For the development of the seismic reflection method, studies are conducted to properly deal with a situation where there are high-velocity layers at levels shallower than the object coal bed, and a conclusion is reached that quake generation based on the pseudorandom binary sequence code will be the best for the purpose. The system was tested for verification in a producing coal mine. As for measurement in the bored hole, an on-site test was conducted for a geophysical logging system capable of determining the total sulfur content, ash, and the like, and the system was found to supply high-quality data. In developing the coal potentiality assessment system, studies were made about the basic concept of the coordination of the system with the coal GIS (geographical information system) dealing with spatial data and about the functions of the system, and a conceptual design was prepared. (NEDO)

  6. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)

  7. Report on the basic survey on promotion of joint project implementation in fiscal 1998. 'Repowering of three gas-based thermal power plants'; 1998 nendo kyodo jisshi nado suishin kiso chosa. Gas base karyoku hatsudensho no repowering (3 plant)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective of reactivating and reduction of emission of greenhouse effect gases, investigations and discussions were given on repowering three thermal power plants in the Federal Republic of Russia. The project on Kirishi Power Station calls for withdrawal of 1800-MW capacity out of the existing generation capacity of 2100 MW, and installation of a combined cycle power plant having an output capacity of 1950 MW. The existing 300-MW capacity will be used mainly for heat supply. At Puskovskaya Power Plant, a combined cycle power plant with a capacity of 1170 MW will be built newly. Iriklinskaya Power Station will have the existing plant removed, where a new combined cycle power plant with a capacity of 2340 MW will be constructed. As a result of the discussions, the cumulative reduction amount of CO2 emission will reach 44.67 million tons, 10.53 million tons, and 89.94 million tons respectively, and the investment return rate before tax will be 11.35%, 11.85% and 11.18% respectively. This project is expected to contribute largely to reduction of CO2 emission, and at the same time strengthen the foundation of the power plant management. (NEDO)

  8. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the energy conservation of the Lianyuan Iron and Steel Group Complex, China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Lianyuan tekko sho energy chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, a feasibility study was carried out of the installation of energy conservation facilities at the steelworks of Lianyuan Iron and Steel Group Complex, Loudi City, Hunan Province, China. The installation of the following facilities was studied: coke dry quenching (CDQ) equipment, coal moisture control (CMC) equipment, sintering ignition furnace equipment, cooler exhaust heat recovery equipment, top pressure recovery turbine (TRT), and hot stove exhaust heat recovery equipment. As a result of the study, the energy conservation amount was 20,000 toe/y by CDQ, 2,530 toe/y by CMC, 900 toe/y by improvement of ignition furnace in the sintering process, 12,300 toe/y by sintering cooler, 13,200 toe/y by TRT, and 10,300 toe/y by hot stove exhaust heat recovery equipment. Further, the amount of greenhouse effect gas reduction was 61,022 t-CO2/y, 7,843 t-CO2/y, 2,896 t-CO2/y, 38,060 t-CO2/y, 55,295 t-CO2/y, and 40,621 t-CO2/y, respectively. In the estimation of effects vs. expenses, the sintering ignition furnace, sintering cooler exhaust heat recovery, and hot stove exhaust heat recovery indicated the comparatively favorable values. (NEDO)

  9. Research report for fiscal 1998. Basic research for promoting joint implementation for CO{sub 2} reduction at Keio University; 1998 nendo chosa hokokusho. Keio Gijuku Daigaku ni yoru CO{sub 2} sakugen no tame no kyodo jisshi suishin kiso chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A research is conducted into China's current problems of energy-related environments, and studies are made for the assessment of its potentials for greenhouse gas reduction, such as CO2 from coal, and for the prevention of environmental pollution in urban areas. By the survey of the current states of the supply and demand of energy and heat in China, and in Beijin, it is found that fuel conversion, which means the disuse of coal in this case, is necessary for a success in SO2 measures in the heat supply department. Since the rate of concentrated heat supply undertaken by heat supply businesses is low, it is inferred that potentials for CO2 reduction are quite high in this department. Concerning technological problems about conversion from coal to natural gas and heat supply, deliberation is made on a scenario covering how to approach the energy demand model, combustion in the natural gas boiler, and the home heating fuel. In discussing air pollution in China, the difficulty known as transboundary air pollution is taken up. It is concluded that conversion from coal to natural gas or coal disuse will serve effectively the purposes of energy saving, SO2 reduction, and CO2 reduction. (NEDO)

  10. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Introduction of central load dispatching center in Oman; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Oman koku ni okeru chuo kyuden shireijo no donyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In Oman, electric power supply is made by operating a large number of gas turbine generators. However, the operation is inefficient as a whole as a result of operating the generators provided with large reserves to minimize effects of unit failures in each power plant as one unit. Therefore, the present investigative study has begun from discussing the achievement of energy conservation and reduction of greenhouse gas emission by managing the demand and supply in an economical manner upon introducing a central load dispatching center (CLDC). Given the introduction of CLDC, the effects of introducing the equi-{lambda} method with still higher economy and of introducing the control system of reserve operation power may be summarized as follows: the energy saving effects (converted to crude oil quantity) are 22,400 toe/year for the former case and 35,800 toe/year for the latter case; and the greenhouse gas reduction effects are 52,000 t-CO2/year for the former case and 84,000 t-CO2/year for the latter case. This is an effective project with a considerable amount of effect as a result of introducing the equi-{lambda} and of introducing the control system of reserve operation power, while the investment amount is relatively small. The investment recovery period is 2.5 years and 2 years, respectively, making the project considerably promising as a CDM project. (NEDO)

  11. Model project for enhancing energy consumption efficiency in developing countries. Report on changes of energy conservation technology and environmental protection technology in the chemical industry of Japan; Hatten tojokoku energy shohi koritsuka model jigyo. Nippon kagaku kogyo ni okeru sho energy gijutsu to kankyo taisaku gijutsu no hensen hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    For the purpose of contributing to the economic growth and the global environmental protection in the Asian area, an investigation was carried out into energy conservation technology and environmental protection technology in the chemical industry of Japan. Measures for energy conservation are shifting from those which do not cost so much such as reduction in excess air rate of the heating furnace, and reduction in reflux ratio of the distillation tower to those with equipment investment such as waste heat recovery of the heating furnace and waste heat recovery of the distillation tower. In the 1980s, the utilization of low temperature waste heat by absorption type refrigerator and heat pump was promoted and the energy utilization efficiency by computer control was enhanced. Concerning environmental measures, the following were carried out: installation of the flue gas desulfurization device and reconstruction of high-rise stack, reduction of NOx by combustion control, smoke/dust disposal of electrostatic precipitator, combustion of hydrocarbon causing photochemical oxidant, catalytic oxidation, condensation, treatment by activated carbon, activated sludge treatment for BOD/COD, diaphragm process for dimethylmercury, ion exchange resin process, etc. 21 refs., 29 figs., 27 tabs.

  12. Fiscal 2000 basic survey for coal resource exploration. Survey for development of new exploration technology (Exploration of shallow layers on the land - Collection of data and materials); 2000 nendo sekitan shigen kaihatsu kiso chosa shiryoshu. Shintansa gijutsu chosa kaihatsu (rikuiki senso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    As agreed upon between NEDO (New Energy and Industrial Technology Development Organization), Japan, and Queensland, Australia, joint research was conducted on new technology for coal exploration within Queensland, and data collected during the research and related materials are compiled into this book. The book contains the Agreement for the Joint Research of New Technology in the Geophysical Exploration of Coal Resources (Japanese and English), GPS (global positioning system) survey results along 2-dimensional seismic reflection method traverse lines, GPS survey results along 3-dimensional seismic reflection method traverse lines, seismic generator vehicle inspection and repair report, geophysical logging observer's logs and test bore dip measurement data sheets, examples of outputted shot records (2-dimensional seismic reflection method), examples of outputted shot records (3-dimensional seismic reflection method), analysis and testing report on Girrah layer samples, reference literature on PRBS (pseudorandom binary sequence), collections of photographs of cores sampled by test boring (BG001, BG002, BG003, BG004), collections of other photographs, and so forth. (NEDO)

  13. FY 1999 report on the study of the future course, etc. of 'the basic survey for promotion of Joint Implementation, etc.'; 1999 nendo 'kyodo jisshi nado suishin kiso chosa' no kongo no hokosei nado ni kansuru kento chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper conducted the demonstration of the multiplier effect of 'the model project for heightening of the international energy consumption efficiency, etc.' carried out by NEDO and its subsidiary project, 'the project on the basic survey for promotion of Joint Implementation (JI),' and the comparative study between these projects and the JI/CDM projects proposed in the world. In the quantitative evaluation of the multiplier effect, in the case of making the demonstration of the same technology in the same area both in the model project and the basic survey for promotion of JI, it becomes possible to grasp the CO2 reduction effect with high accuracy, but the CO2 reducible amount is small. Inversely, as to the technology for which the basic survey for promotion of JI is studied, but the model project is not carried out, it becomes possible to grasp the CO2 reduction effect with low accuracy, the CO2 reducible amount is large. In the comparison with the JI/CDM projects proposed in the world, the CO2 reduction amount was approximately $2.7 billion, 250 million tons, in the UNFCCC project, and approximately $5.0 billion, 500 million tons, in the IJ project. There was no very big difference in the cost effect. (NEDO)

  14. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project for improvement of efficiency of the power generation/desalination plant in Aktau City; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Aktau shi hatsuden zosui plant koritsu kaizen jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, feasibility study was conducted for improvement of efficiency of power generation/desalination facilities at MAEK Energy Center, Aktau City, Manghistau, Kazakhstan. Presently, the main facilities are the conventional natural gas fired power plant, evaporation type seawater desalination facility, hot water production facility, etc. In the project, introduction of the following was planned to be made: cogeneration facility composed of two units of 1,100-degree C class gas turbine and reverse osmosis (RO) type desalination facility for drinking water production with a capacity of 50,000 t/d. As a result of the study, the energy conservation amount in this project was 151,900-165,400 toe/y in power generation facility, and the greenhouse effect gas reduction amount was 355,000-387,000 t-CO2/y in power generation facility and 268,000 t-CO2/y in desalination facility. The construction cost and operational cost of the plant were 45.7 billion yen and 2.8 billion yen/y. In the economical estimation, ROI and ROE before tax were 7.4 and 34.8, respectively, which were considered to be appropriate values as social infrastructure related conditions. (NEDO)

  15. Basic investigation on promotion of joint implementation in fiscal 2000. Efficiency improvement project for district heat supplying plants in Dailian City in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku/Dailian shi chiiki netsu kyokyu plant kokoritsu kaizen project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions have been given on energy saving possibilities at two medium-sized heat and power supplying plants in the city of Dailian in China. The project will improve the operation methods of the heat and power plants so that the energy cost can be minimized, and attempt to improve the boiler heat efficiency and save the energy by means of heat recovery and utilization. The draft modification plan for energy conservation has planned operation optimization for energy conservation, control of boiler operation under variable pressure, modification of the external boiler heat converter, use of inverters for the large capacity motors for boilers, and recovery of heat from the boiler blow-down water. In the analysis, models were structured from the operation data, and the effects of applying the energy saving measures were derived from simulation. As a result, the energy saving effect was found to be about 13,000 tons at the Chunhai plant and about 7,000 tons at the Pulandian plant annually (converted to oil). The reduction in greenhouse gas emission was found to be about 40,000 tons at the Chunhai plant and about 20,000 tons at the Pulandian plant annually. The number of years for investment payback is about 4.1 years at the Chunhai plant, and about 4.9 years at the Pulandian plant, wherein good profitability can be estimated. (NEDO)

  16. FY 2000 report on the basic survey to promote Joint Implementation, etc. Prevention of emissions of gasoline vapor from oil depots in Indonesia; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Indonesia sekiyu kichi nado kara no gasoline joki hoshutsu no boshi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A field survey was conducted of oil shipment depots in Java and Bali islands owned by Indonesia's state-run oil company to study measures for reduction in greenhouse effect gas emissions. Studies were made on the grasp of the amount of the hydrocarbon vapor emitted into the air, the amount of the gasoline recovered in case of adopting the vapor emission preventive technology, equipment cost/operational cost, etc. Concretely, the following three were studied: change of the gasoline storage tank to the inner floating roof type, and prevention of evaporation loss at the time of receiving and breathing loss caused by temperature changes; replacement with the vapor recovery type loading arm to recover gasoline vapor generated at the time of shipment/filling, and installation of the vapor recovery unit to recover vapor as gasoline; vapor balance system to recover in underground tank the gasoline vapor generated at the time of filling gasoline at gas station. As a result of the study, the recovered gasoline amount was 66,393 Kl/y and the CO2 reduction amount was 14,474 t/y at oil shipment depots and approximately 650 gasoline stations in Jakarta and Surabaya. (NEDO)

  17. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Project to utilize coal bed methane gas for power generation in Poland; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Poland tanko methane gas hatsuden riyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Having the Mining Industry Restructuring Public Corporation located in the city of Katowice, Poland as the counterpart, a feasibility study has been executed on a project to utilize coal bed gas for power generation. Selected for the study are the 'Budryk coal mine' owned by KWK 'Budryk' Coal Company and the 'Pniowek coal mine' owned by Jastrzebie Coal Company. Since the Pniowek coal mine can utilize the whole quantity of recovered methane by 2001, the Budryk coal mine was selected as the object of the project. As a result of the trial calculation on the economy when the new gas power plant is installed in the Budryk coal mine, the energy substitution effect was found to equal to a power amount at transmission terminal of 6 MWh/year. Furthermore, when proliferation effect is taken into consideration, an enormous effect can be expected if new coal mines are developed and the existing cola mines will go further deeper, because the Silesian coal mine presently has the coal resource quantity of 57 billion tons and the annual gas discharge quantity of 750 million m{sup 3}. Therefore, if the technologies to recover, manage and utilize the gas are established at the Budryk coal mine, a large effect leading to an aspiration would be expected under the current situation of the structural reorganization under which the Polish coal companies are placed. (NEDO)

  18. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project on methane gas recovery use in the Donetsk coal field/coal mine; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Donetsk tanden tanko methane gas kaishu riyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of getting petroleum substitution energy and reducing greenhouse effect gas emission, an investigational study was carried out of the project for methane gas recovery/utilization at the Donbassa coal mine in Ukraine. At the Donbassa coal mine, degassing by test boring is being conducted to reduce the gas emission at coal face for safety, but most of the gas is discharged into the air. In this project, the following were studied: degassing boring/gas induction from bore hole/measurement in gas induction pipe, gas recovery system combined with gas induction in flyash, and installation/operation of gas engine power generation facilities (1,710kW x 7 units) with exhaust heat recovery boiler using the recovered methane gas as fuel. The results obtained were the petroleum substitution amount of 31,000 toe/y and the amount of greenhouse effect gas reduction of 480,000 t/y. In the economical estimation, the initial investment amount was 3 billion yen, the profitability of the total investment used was 2.9%, and the internal earning rate was 6.5%. (NEDO)

  19. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey of the effective use of wastes at palm oil refineries; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Palm oil seisei kojo ni okeru haikibutsu yuko riyo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As to empty fruit bunches (EFB) which are wasted at the Lahad Datu plant of Felda Vegetable Oil Products Co. in Malaysia, a project was studied for energy substitution and greenhouse effect gas reduction by fluidized bed cogeneration facilities using this as fuel. In the project, studied was the introduction of on-site cogenerator of 7,800kW in generating-end output, and that of IPP cogenerator of 16,000kW as reference. As a result of the study, the energy substitution amount in toe in 20 years was approximately 376 k tons in case of on-site power generation/fluidized bed boiler and approximately 695 k tons in case of IPP and fluidized bed boiler. The amount of greenhouse effect gas emission in toe in 20 years was approximately 5,757 k tons and 11,654 k tons, respectively. Concerning the profitability, the internal earning rate was 3.32-8.47% in case of on-site power generation/fluidized bed boiler and 9.13-14.65% in case of IPP/fluidized bed boiler. It indicated the materialization of the project. (NEDO)

  20. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Rehabilitation of gas turbine power plants owned by Myanmar Electric Power Enterprise (MEPE); 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. MEPE/gas turbine hatsudensho rihabiri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Myanmar generates majority of the whole electric power by using thermal power plants consisting of single gas turbines, and gas and steam composite turbines. However, because of chronic power shortage and fund unavailability, the major gas turbines are being operated in quite inadequate environment. As a result, reduction in power generation efficiency has become manifest due to aged deterioration, increasing the quantity of CO2 emission. The present project is, in order to link it to the 'Clean Development Mechanism' being carried out with developing countries, and placing Tharkayta Power Plant as the object, intended to comprehensively discuss a rehabilitation program to renew the existing gas turbines with advanced ones, in relation with feasibility of the project implementation including the effect of CO2 emission reduction, profitability, and proliferation effects. A prospect was acquired that, by replacing the gas turbines alone with 25-MW class gas turbines, the plant output will increase to 97.2 MW (78.5 MW in the existing facilities) and the plant efficiency to 43.3% (36.5% in the existing facilities). The energy saving effect during a period of 40 years would be 708,000 (toe) as heat consumption converted to crude oil, and the CO2 emission reducing effect would be 2,160,000 (t-CO2), respectively. (NEDO)

  1. Report on a fiscal 1995 basic survey of the environmental engineering. Investigational study on the systematization of the environmental business related information; 1995 nendo kankyo business no engineering ka kiso chosa hokokusho. Kankyo business kanren joho no system ka ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    An investigational study was conducted on directionality of arranging the environmental business related information, based on the analysis of the status of arrangement of the environmental business related information and the examination of the needs for the environmental business related information. As the directionality of arranging the environmental business related information which is most suitable for enterprises and research institutes to use, the following were considered: (1) arrangement of a system for effective use of the information owned by environmental related organs; (2) arrangement of a system for supply of the environmental business related information mainly to medium and small companies; (3) arrangement of the environmental business related information forum. In (1), it is necessary to arrange the system for the joint use of information owned by each institute. In (2), the tackling with the environmental business should be supported by arranging the system for information supply from big companies to medium and small companies. In (3), it is necessary to arrange the information forum, and it is necessary to control information thoroughly for the management for prevention of bad deeds of brokers. 7 refs., 19 figs., 21 tabs.

  2. Basic investigation on promotion of joint implementation in fiscal 2000.'Modification construction at Cherkassyoblenegro Combined Heat and Power Station in the Republic of Ukraine'; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Ukraine kyowakoku Cherkassyoblenegro netsu heikyu hatsudensho kaishu koji

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, investigations and discussions were given on modification of Cherkassyoblenegro Combined Heat and Power Station in the Republic of Ukraine. The project calls for shutdown of the first block and the heat supplying auxiliary boilers being the oldest facilities in the existing station, and utilization of the second block for emergency use. The new facilities will consist of natural gas burning gas turbine combined cycle cogeneration facilities of 200-MW class including two gas turbines, one steam turbine, two each of waste heat recovery boilers, ducts and stacks. As a result of the discussions, if the project execution period is set for 20 years, the energy saving effect would be 144,215 tons of crude oil equivalent annually, and the greenhouse gas emission reducing effect would be 431,421 t-CO2 annually. The total fund amount required for the project is estimated to be 185,700,000 dollars. With regard to the profitability, the internal profit rate for the total fund after tax would be 8.3%, and the principal and interest repayment multiplying factor for single year would be greater than 1.9, whereas the profitability can be anticipated if the financing is available under generous conditions. (NEDO)

  3. Report on the survey in fiscal 1998. Basic survey on promotion of joint implementation (scrap and build of Atyrau Refinery in the Republic of Kazakhstan); 1998 nendo chosa hokokusho. Kyodo jisshi nado suishin kiso chosa (Kazakhstan kyowakoku Atyrau seiyusho no scrap and built)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Discussions were given on the modification plan for Atyrau Refinery in Kazakhstan as a basic survey on promotion of joint implementation based on the COP3. The plan is intended mainly on modernization of overaged refineries, energy conservation, and prevention of pollution. The gists of the plan consist of improvement of quality of diesel oil and gasoline, reduction of production ratio of fuel heavy oil, plant efficiency enhancement, and environmental improvement. The crude oil selected in consideration of the demand in market was the light-gravity Tengiz crude oil whose production increase was attempted. For product quality, a plan was established to modify the facilities to realize improvement in content of light oil, sulfur and aroma, production of non-leaded gasoline, and octane value improvement in consideration of exporting the product into European markets. Since this project is applied to a private corporation, it is necessary that the project is commercially viable. However, the commercially low profitability makes the implementation of the project difficult unless such conditions as crude oil price and product sales price would be improved largely. Effect of the carbon dioxide gas reduction as a result of the implementation would be 180,000 tons annually, but in terms of cost effect, the implementation requires an investment of 500 Dollars per ton of carbon dioxide, thus the effect is low. Reduction in other greenhouse effect gas is not large quantitatively. (NEDO)

  4. FY 2000 International energy use rationalization project. International technology dissemination project for improving energy consumption efficiency (Green helmet project for steel heating furnaces in Thailand); 2000 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Kokusai energy shohi koritsuka nado gijutsu fukyu jigyo (Green helmet jigyo (Tai: kozai kanetsuro))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The project for energy saving dissemination activities and technological assistance for Thailand is carried out, and the FY 2000 results are reported. For Siam Iron and Steel (SISCO), the experts are dispatched for reviewing the operating conditions of the facilities constructed by the model project, their maintenance and examination, time series diagnosis of the recuperator performance, and providing technical assistance for fuel consumption and high-load combustion of the downstream unit. Furthermore, the site survey and technical assistance are provided for two newly selected Thai steel enterprises, Sahaviriya Steel Industries Public Co. (SSI) and the Bangkok Iron and Steel Works Co. (BISW). For SSI, it is predicted that energy of approximately 50Mcal/ton can be saved by, e.g., enhancement of waste heat recovery, enhancement of heat insulation of skid pipes, introduction of steel discharging temperature prediction system, and combustion control. For BISW, it is predicted that energy of approximately 25Mcal/ton can be saved by, e.g., enhancement of waste heat recovery and reduction of heat loss in the waste gas. (NEDO)

  5. Development of highly workable concrete, 'Neuro-crete'. Part 1. ; Basic properties of Neuro-crete and application to large-scale structures with heavy-reinforcement. Koryudo concrete (Neuro crete) no kaihatsu. 1. ; Neuro crete no kiso bussei to kamitsu haikin wo yusuru doboku kozobutsu eno tekiyo

    Energy Technology Data Exchange (ETDEWEB)

    Miura, N; Chikamatsu, R; Sogo, S; Haga, T; Iriya, K; Taniguchi, M [Obayashi Corp., Tokyo (Japan)

    1993-08-10

    This paper introduces a highly workable concrete, 'Neuro-crete' developed for the purpose of simplifying construction of concrete structures and improving their guality. This concrete has a feature that it can reduce or eliminate a compacting process. Resistance to separation of coarse aggregate from mortar (separation resistance) is required. A difference of the material from conventional concrete is an increased unit particulate amount (binder + inert particulate). The binders may include cement, blast furnace slag particulate, flyash, silica fume, and expander. The inert particulate may be limestone powder. Kinds and mixing ratio of binders are important in improving fluidity. The separation resistivity is largely affected by a water-cement ratio and a water-binder ratio. A flow distance limit exists to maintain the fluidity without decreasing the compression strength after curing. The internal structure having become denser suppresses progress of neutralization or salt penetration. Drying contraction is equivalent to or less than the conventional concrete. 5 refs., 30 figs., 3 tabs.

  6. FY 2000 report on the coal resource development basic survey (information collection analysis project). Cooperative project on the open-cut coal mine rehabilitation technology; 2000 nendo sekitan shigen kaihatsu kiso chosa (joho shushu kaiseki jigyo) hokokusho. Rotenbori sekitan saikutsu atochi shufuku gijutsu kyoryoku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    At the Ensham open-cut mine in Australia, an investigational survey was conducted of a new rehabilitation technology which can contribute also to securing CO sink with the aim of preventing global warming, and the FY 2000 results were summed up. In the survey, the surface soil, sand silt layer, brown rock layer, gray sandstone layer and coal seam were moved from open pits, the goaf was embanked, and the experimental section was set up. As to the place for test, conducted were collection of information on adaptive plant species, bacterium species, meteorology and precipitation pattern, soil analysis, etc. Concerning the bacteria, bacteria were newly separated and tested at the survey site, besides the species to be tested. After planting, measurement of the growth amount of plants, etc. were conducted grasping the meteorology and the water-pouring state during cultivation. For the basement, three kinds of spoils were used, and permeability is different in each spoil. Permeability is an important factor to plants. Too good permeability and too bad permeability are both not good. A future follow-up survey will make what kind of spoil is suitable for eucalypti possible. (NEDO)

  7. FY 1998 basic survey for coal resource development. Data collection of the joint research of new technology in the geophysical exploration of coal resources (land area shallow seam survey); 1998 nendo sekitan shigen kaihatsu kiso chosa shiryoshu. Shintansa gijutsu chosa kaihatsu (rikuiki senso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This is a compilation of the data on the coal resource land area shallow seam survey conducted in FY 1998 as the basic survey for coal resource development. The trend survey was made from July 26 to August 6, 1998. The purposes of the survey are to study the image analysis method, examples of application of the reflection seismic survey to coal, and inversion technology. The data compilation includes the following: 1. Minutes of the proceedings of the FY 1998 Japan-Australia steering committee (in English). 2. Data/proceedings of the FY 1998 Japan-Australia technical study committee (in English). 3. Results of the GPS measurement of reflection seismic survey traverse lines in Caroona district. 4. List of parameters in the FY 1998 reflection seismic survey data processing. 5. Report on the work of inspection/repair of seismic pulse generator. 6. List of the data on diameter of the test boring conducted in FY 1998. 7. NEDO-DMR CAROONA DDH borehole core pictures. 8. Estimated curves. 9. Report on the trend survey of the FY 1998 coal resource development basic survey (land area shallow seam survey). 10. Pictures. 11. Data on the 1st (FY 1998) new exploration technology study committee. (NEDO)

  8. Basic survey project for joint implementation in fiscal 1998. Study of BFG mono-firing gas turbine combined cycle power plant application for the steel mill of China; 1998 nendo kyodo jisshi nado suishin kiso chosa. Chugoku seitetsu kaishamuke koro gas sensho combined cycle hatsuden setsubi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Discussions were given on application to the steel mills in China of a 1100-degree C class high-efficiency combined cycle power plant (CCPP) exclusively firing blast furnace gas developed jointly by Kawasaki Heavy Industries Ltd. of Japan and ABB Corporation of Switzerland. The CCPP can utilize the energy possessed by a fuel without waste from high temperature zones to low temperature zones, being capable of attaining high efficiency that cannot be achieved with the single cycle. The CCPP has the efficiency exceeding that of the BTGP by about 10% or more in absolute value. The investigations and discussions were given on Shougang General Corporation, Anshan Steel Corporation and Wuhan Steel Corporation. As a result, in the plan for the power plant of Shougang General Corporation on which both parties have agreed, the project implementation can be expected to result in electric power generation of 110 MW in annual average, factory air supply of about 100 tons per hour in annual average, and annual reduction of carbon dioxide of 841 kilo tons. Wuhan Steel and Anshan Steel will require implementation of further detailed investigation, but the possibility of realization is considered high (NEDO)

  9. Report on the survey in fiscal 1998. Basic survey on promotion of the joint implementation (energy saving project for the Baku and Nobo-Baku refineries in Azerbaidjan); 1998 nendo chosa hokokusho. Kyodo jisshi nado suishin kiso chosa (Azerbaidjan Baku/Nobo-Baku seiyusho shoene project)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In order to promote the COP3 joint implementation with the Baku and Nobo-Baku refineries in Azerbaidjan Republic, a basic survey was carried out on energy saving measures for the heat exchange systems, fired heaters, and FCC units. Carbon dioxide is discharged annually in the amount of 1.1 million tons as the design value. Extensive overaging of the facilities has reduced the thermal efficiency to as low as 66%. Therefore, in order to recover motive power from the FCC units by improving the heat exchange systems and minimizing the fuel consumption of the fired heaters as low as possible, a draft modification method has been planned and rough design was made, including application of the modern energy saving technologies currently used in Japan. This has revealed that it is possible to reduce load on the fired heaters and assure the thermal efficiency of the entire boilers at 90%. Energy conservation can be realized on the heat exchange systems for crude distillation equipment operating at normal temperature, fired heaters and FCC units, producing carbon dioxide reduction effect of 600,000 tons annually. The Azerbaidjan side has very high interest in this project, intends to contribute to the project as the joint implementation parner, and expects technical and financial assistance from Japan. (NEDO)

  10. FY 1997 basic survey for coal resource development. Data collection of the joint research of new technology in the geophysical exploration of coal resources (water area medium depth seam survey); 1997 nendo sekitan shigen kaihatsu kiso chosa shiryoshu. Shintansa gijutsu chosa kaihatsu (suiiki chushindoso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In 'the new exploration technology test on coal resource' (water area medium depth seam exploration) jointly conducted between Japan and China, tests have been carried out for 5 years on the BDR-5 test boring measurement monitoring system and the diamond bit which are items of the technology development of high resolution seismic survey system and high efficiency test boring system. As a result, the new technology test was successful, and technical economic effects were obtained. The situation of the test was summarized. The following data were compiled as shown in Data No.1-12. 1. The proceedings of the FY 1997 Japan-China steering committee (No.9). 2. Report on the survey of China verification field South Sihu water level situation. 3. The proceedings of the FY 1997 Japan-China steering committee (final). 4. Report on the FY 1997 reflection seismic exploration survey. 5. Report on the FY 1997 No.2 test boring survey. 6. Summarization of the test on 'the new exploration technology of coal source' conducted between Japan and China. 7. Report on the drilling data measurement. 8. Various sections of the reflection seismic survey data processing. 9. Traverse line chart. 10. T3 isochrone chart. 11. T3 depth structural chart. 12. Report on the new exploration technology survey development (water area medium depth seam exploration) geological model making. (NEDO)

  11. Report on the FY 1993 basic survey for industrialization related to the survey of overseas geological structure (Muara Lakitan area, Indonesia). Tables and drawings; 1993 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa hokokusho (Indonesia Muara Lankin chiku). Hyo oyobi zumen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    These are tables and drawings for the FY 1993 basic survey for the coal mine development/industrialization in the Muara Lakitan area of Indonesia. The geological structure in the survey area is under six sets of the anticline/syncline structure which have an NW-SE axis of fold, and exposes the Muaraenim seam repeatedly. The theoretical coal reserve in the depth down to 200m of each of the seams, Nos. 1, 2, 5, 12 and 13, which are great in coal seam change and exist relatively stably, is 143 million tons. The depth for adoption of the shovel/truck system open pit mining seems to be 50m or shallower, and the production is to be approximately 70 million tons. The coal is classified into a subbituminous coal-brown coal rank of the JIS classification. As tables, included were a table of the calculation of coal amount by seam and a table of the analytical result of coal by seam. As drawings, included were borehole logs of coal seam by boring, diagrams of thickness by seam such as the seam thickness/diagrams of thickness by seam such as the coal thickness, diagrams of range of calculating the coal amount, etc. Besides, in relation to coal properties, the report included value diagrams by seam of the inherent moisture, the ash, the volatile matter, the fixed carbon, the heating value, and the total sulfur content. (NEDO)

  12. Report on information collection and analysis for fundamental survey on coal resource development in fiscal 1998. Survey on coal supply potentiality in Bowen Basin in Australia; 1998 nendo sekitan shigen kaihatsu kiso chosa joho shushu kaiseki hokokusho. Goshu Bowen bonchi sekitan kyokyu potentiality chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A survey was made on coal supply potentiality in Bowen Basin in Australia. The main coal beds exist in the order of four beds in the Permian period. The oldest bed is the Reids Dome bed in the Lower Permian period, deposited in the south-west part of the basin. The later wide-area transgression has caused the Back Creek bed groups to deposit, whereas three coal measures have deposited in a concave on the raised basic bed. Later, the ocean has invaded into the entire basin. After having turned into the Upper Permian period, regression had occurred from north to south, where major coal measures such as the Moranbah and German Creek beds had deposited over the entire basin. Further regression has taken place to south, causing three uppermost coal measures to have deposited over the entire basin. In major part of the areas identified currently with existence of coal measures, and even in areas without mines, the mining right or the exploration right has been established, limiting the areas having development potentiality. Five abandoned mining areas exist in the Rangal coal measure, two in the Moranbah coal measure, two in the Reids Dome coal measure, and one in the Baralaba coal measure. There is a possibility of discovering areas developable for a scale of several ten million tons. (NEDO)

  13. FY 1998 annual summary report on project for international energy consumption rationalization. Survey on analysis tool for improving efficiency of Asian energy consumption (data book 2 for 1985); 1998 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo (shiryoshu 2 1985 nen data)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The data book is compiled, based on common industrial classifications, as the tool for analyzing, e.g., the mutual ripple effects of economic growth and increased efficiency of energy consumption throughout the Asia-Pacific region. This book summarizes the industrial-related and energy-related tables for 8 Asian countries and Japan. The book II is for the 1985 data (1987 data for China), comparing with the book I for the 1990 data. The industry-related tables are composed of the tables for transaction bases, input coefficients, final demand converters, importation coefficients, inverse matrices, sensitivity/influence coefficients, production inducement levels, production inducement coefficients, degrees of dependence on production inducement, importation inducement levels, importation inducement coefficients, and degrees of dependence on importation inducement. Energy-related tables are composed of the tables for, e.g., energy input, energy consumption, emissions, and CO2 emissions. (NEDO)

  14. Fiscal 2000 international energy use rationalization measures project. International energy consumption efficiency improvement technology diffusion project - Green helmet project (Thailand: Report on heating furnace energy conservation seminar); 2000 nendo. Kokusai energy shiyo gorika to taisaku jigyo, Kokusai energy shohi koritsuka to gijutsu fukyu jigyo, Green helmet jigyo (Thai : kanetsuro shoenergy seminar hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The above-named seminar was held in Bangkok, Thailand, on January 30, 2001, and covered three kinds of industries of ceramics, glass, and aluminum. Approximately 200 people attended the meeting, consisting of NEDO (New Energy and Industrial Technology Development Organization)-affiliated people and 16 lecturers from Japan, and Thai participants. The seminar comprised a 'keynote address' and 'lectures on engineering' that aimed at the three industries as a whole, and 'lectures on engineering' and 'cases and activities for energy conservation' that aimed, respectively, at the three industries. Lectures were delivered on operating technologies which were already in practical use and on state-of-the-art technologies. The keynote address, entitled 'Global warming prevention and industrial furnaces,' covered the results of the 'High-performance industrial furnace field test project.' The lectures on engineering dealt with the 'instrumentation control system' and 'heat insulation technology' which were basic technologies for energy conservation and 'diagnosis technology and practice' which aimed at the enhancement of energy conservation after the start of operation. Questions and answers were earnestly exchanged. (NEDO)

  15. Project for rationalization measures for international energy conservation. Model project concerning efficient consumption of energy for international energy conservation (Model project of waste heat recovery on billet reheating furnace); 1999 nendo kokusai energy shiyo gorika nado taisaku jigyo seika hokokusho. Kokusai energy shohi koritsuka nado model jigyo (kozai kanetsuro hainetsu kaishu model jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of curtailing energy consumption in the steel industry, a heavy energy consuming industry in Thailand, a model project was carried out for waste heat recovery on a billet reheating furnace, with the fiscal 1999 results compiled. This model project is to install a high efficiency recuperator and the latest combustion control system in the existing furnace in a SISCO (The Siam Iron and Steel Co., Ltd.) plant in Thailand. This year, following the preceding year, the construction manual was prepared, as were the test run manual, performance verification manual, operation and maintenance manual, etc. Supervisors were also dispatched to the site, giving guidance of the installation work, test run and the demonstrative operation, on the basis of these documents. Operation for verifying performance of the equipment was implemented on November 17, 1999, with the intended results obtained. Subsequently, operation maintenance instructors were dispatched, with energy saving effect proved through the collection/analysis of operation data and monitoring, for example. Further, as the dissemination activities, pamphlets and videos were prepared, and seminars were held, among others. (NEDO)

  16. FY 2000 report on the basic survey to promote Joint Implementation, etc. Energy conservation by modernization of a cement plant (Double Horse Cement Co.) in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku cement kojo (Double Horse Cement) kindaika ni yoru sho energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was conducted of possibilities of energy conservation and greenhouse effect gas emission reduction in the cement production process of Double Horse Cement Co., Mianyang City, Sichuan Province, China. Double Horse Cement adopts the wet type long kiln production system and has a production ability of approximately 1.5 million t/y. In the project, as to three production lines out of the six production lines, improvement was planned to be made of the technologies on the following: mixing of raw materials, grinding of raw materials, NSP, clinker cooler, clinker pre-grinder, high-efficiency separator, waste heat use power generation, etc. As a result of the study, it was found that the energy conservation amount obtained was 54,646 toe/y. And, the amount of greenhouse effect gas reduction was 169,086 t-CO2/y. The total fund required for this project was approximately 5.553 billion yen and the internal earning rate was 7.36% after tax. When the project is carried out, expenses vs. effects are 9.8 toe/million yen in energy conservation amount and 30.4 t-CO2/million yen in greenhouse effect gas reduction. (NEDO)

  17. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey for prevention of pollution by caustic soda in the mercury process and for heightening of efficiency; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Suiginho kasei soda kogai boshi koritsu kojo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In relation to facilities of Azerchimia, state concern, in Sumgait City, Azerbaijan, an investigational study was conducted of the project for energy conservation and greenhouse effect gas emission reduction by converting the caustic soda plant from the mercury process to the ion exchange process. The facilities of Azerchimia are badly superannuated and consume much more electric power than those in the newest technology. Moreover, the soil pollution by the plant using the mercury process is becoming a big problem. By carrying out this project, energy conservation can be achieved by reducing the amount of purchased power from thermal power plants outside. As a result of the study, the amount of the fuel used at the power plant was reduced to 40,700 toe/y. And, the amount of greenhouse effect gas emission was reduced to 131,000 t-CO2/y. In the study of the profitability, the internal earning rate of investment after tax was 8.6% and the internal earning rate of fund was 40% in the case of soft loans. In the case of commercial loans, however, they were 8.6% and 9.4%, respectively, which indicated that the materialization of the project was low. (NEDO)

  18. Basic investigation on promotion of joint implementation in fiscal 2000. Energy saving projects at two steel making companies in Fushun City in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku Fushun shi ni okeru tekko gaisha 2 sha no shoene project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, investigations and discussions were given on two steel making companies in China. Discussions were given for Fushun Special Steel Co., Ltd. on abolishment and unification of four electric furnaces into two new electric furnaces, and for Fushun New Steel Co., Ltd. on installation of a granulation reinforcing facility, a segregation reinforcing device, and cooler waste heat recovery boilers for the sintering machine, installation of sensors including the waste gas oxygen concentration meter, adoption of a process computer, and optimization of the furnace temperature patterns for the heating furnace. As a result of the discussions, it was revealed that the unit requirement for electric power used at Fushun Special Steel can be reduced largely, and so can the fuel used at Fushun New Steel. The annual energy saving effect would be about 500 million yen relative to the investment amount of 2.8 billion yen at Fushun Special Steel, and about 400 million yen relative to the investment amount of about 400 million yen at Fushun New Steel. The greenhouse gas emission would be reduced annually by 40,000 t-CO2 and 60,000 t-CO2 respectively. Fushun Special Steel will execute an international bid in May this year. (NEDO)

  19. Basic investigation on promotion of joint implementation in fiscal 2000. Energy saving program for the Sao Paulo State Primary Schools in the Federative Republic of Brazil; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Brazil Renpo Kyowakoku Sao Paulo shuritsu shoto gakko no sho energy keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, discussions have been given on improvement measures for lighting equipment in the Sao Paulo State Primary Schools in the Federative Republic of Brazil. Measures for the energy saving are composed of modification to high-efficiency lighting equipment using electronic ballasts, high-efficiency fluorescent lamps, and reflectors, and introduction of control systems using lighting control sensors. In the survey, taking up 3,000 schools as the objects of implementation, a project scheme was established that the energy saving measures will be introduced, and the investment cost will be recovered by concluding the ESCO service for five years, after which the school side enjoys the profit for five years. As a result of the discussions, the total project cost will amount to 2.82 billion yen, with which the energy saving quantity would be 7,636 tons annually as converted to crude oil, or 114,540 tons during a period of 15 years as the achievement of the project as a whole. Greenhouse gas emission would be reduced by 7,397 t-CO2 on an annual average, or 110,949 t-CO2 in the project as a whole. Discussions on the profitability revealed that the internal profit rate can be calculated as 15.73%, indicating that the profitability can be envisaged. (NEDO)

  20. Fiscal 1997 basic research on coal resource development (equipment development). Report on R and D of new exploration technology (exploration of medium-depth coal deposits in water areas); 1997 nendo sekitan shigen kaihatsu kiso chosa (kiki kaihatsu hen) hokokusho. Shintansa gijutsu chosa kaihatsu (suiiki chushindoso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This report summarizes the research result on development of new coal exploration technology. For a high-precision and high-resolution reflective seismic exploration system, R and D was made on the exploration technology of several meter in resolution for medium-depth (800m) coal deposits under a lake of 2m deep. As a result, the high-frequency and high-power source (150-200Hz in dominant frequency, 700-800m in penetrability) and the high-frequency and high sensitivity receiver (10-1000Hz in frequency band, 35V/PA in sensitivity) were developed successfully, and the positioning system was improved. The final evaluation of these elementary technologies was carried out through demonstration tests, resulting in satisfactory results. For a high-efficiency trial drilling system, the in-bore trouble prevention system for measurement, processing and analysis of drilling data (drilling length, drilling rate, revolution, bit load, torque) and drilling mud data (charge water pressure, charge/discharge water, density, pH, viscosity) was constructed. The outlook for low-cost measurement and a safety during drilling was thus obtained. (NEDO)

  1. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey for improvement of the district heating plant (No. 48) in the Didi-Digomi section; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Didi-Digomi chiku chiiki danbo plant (No.48) kaizen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was conducted on the project for energy conservation and reduction in greenhouse effect gas emission at the existing district heating plant in Tbilisi City, Georgia. In the project, the following are conducted for the district heating plants in the Didi-Digomi section and Saburtalo section: renewal/higher efficiency of boiler equipment, adoption of cogeneration using gas turbine, improvement of hot water pipeline and improvement of equipment at heat users. As a result of the study, one plan for cogeneration of 2 units x 6MW class in each section was good in terms of economical efficiency and expenses vs. effects, and the other plan for cogeneration of 17 units (8 units and 9 units) x 6MW class was good in terms of the generated output and regional needs. The amount of energy conservation to be made by the former plan totaled 22,678 toe/y in both sections. The amount of greenhouse effect gas reduction is 70,170 t-CO2/y. The internal earning rate is 1.707% in the Didi-Digomi section and 2.249% in the Saburtalo section. The project profit is lower than the initial investment cost, and therefore, it is necessary to consider the profit from the CO2 emission right. (NEDO)

  2. Fiscal 2000 information collection/analysis project on basic research for coal resource exploitation. Research on technology of low-concentration methane gas recovery from underground coal mine; 2000 nendo sekitan shigen kaihatsu kiso chosa joho shushu kaiseki jigyo. Konaikutsu tanko ni okeru teinodo methane kaishu gijutsu chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Technical trends were surveyed concerning the recovery and the use as fuel of low-concentration methane gas or the like contained in the air ventilated out of coal mines. Methane gas recovery technologies include high-temperature incinerators and catalytic incinerators designed to collect heat, method of conversion of methane to CO2 using microbes named methanotrophs, and adsorption methods using activated charcoal, zeolite, or the like. Among technologies that have reached a practical level in the utilization of mine methane gas, there are the temperature regenerative flow-reversal reactor (TFRR) and the catalytic flow-reversal reactor (CFRR) utilizing high-temperature oxidation reaction. TFRR has been reported effective by MEGTEC System after a 6-month operational test of a 3.0m{sup 3}/s plant at a British coal mine. Test and research are over with CFRR, which is now ready for a commercial scale verification test. Recovery by adsorption, though worth further research efforts, is economically away from commercialization at the present stage, and wants more studies of adsorbents, etc. (NEDO)

  3. Basic investigation on promotion of joint implementation in fiscal 2000. Investigations on development of technology to utilize heat of deep earth pressure type hot water in Hungary; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Hungary koku shinso chiatsugata onsui no netsuriyo gijutsu kaihatsu chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions were given on a project to implement district heating, greenhouse heating, and binary power generation by utilizing geothermal resources in Hungary. Hungary has deep earth pressure type hot water areas distributed, that flow hot water of about 90 to 180 degrees C by the bed pressure. The areas that can utilize the hot water were extracted and investigated by using literatures and data. The project plans district heating of about 15,000 households using the geothermal water, heating of greenhouses equivalent to 100,000 m{sup 2}, gas engine power generation by using the flowing fluid pressure and combustion of the generated methane gas, and binary power generation by using the geothermal water. As a result of the discussions, it was revealed that the energy saving effect would save 5,008 Ktoe in 20 years as converted to crude oil, and the greenhouse effect gas reducing effect would reduce 14.2 million t-CO2 in 20 years. The total project cost would be about 16.62 billion yen. The internal profit rate of this project is 11.34%, largely exceeding the opportunity cost, and indicating the financial effect possibility. (NEDO)

  4. Survey report for fiscal 1998. International project for rationalizing energy use (a project for investigating analyzing a tool to improve energy consumption efficiency in Asia) (Data collection 1 (Year 1990 data)); 1998 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo (shiryoshu 1 1990 nen data)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective to identify quantitatively the mutually influencing effect of economical development and energy consumption efficiency improvement in the entire Asia-Pacific region, a data collection was prepared according to the common industry classification as a tool to analyze energy consumption improvement in Asia. This data collection summarizes the industry relation tables and the energy relation tables available in eight Asian countries (Korea, Indonesia, Thailand, Philippines, China, Taiwan, Singapore and Malaysia) and Japan. Both kinds of the tables are unified in conception among the nations, hence comparable. The industry relation table consists of a basic transaction table, a charged coefficient table, a final demand converter table, an import coefficient table, a reverse matrix table, a sensitivity coefficient able, an influence force coefficient table, a production inducing amount table, a production inducing coefficient table, a production induction dependence table, an import inducing amount table, an import induction coefficient table, and an import induction dependence table. The energy table consists of an energy input table, an energy consumption table, and an emission table. (NEDO)

  5. FY 2000 report on the basic survey to promote the joint implementation. Feasibility study for new installation of the Ashuganj NGL rectification plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku ni okeru Ashuganj NGL seiryu plant shinsetsu no tame no FS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of effectively using natural gas and controlling the decrease in forests having ability to absorb/store greenhouse effect gas, a project was worked out for construction of the NGL rectification plant to produce LPG, MS and HSD at Ashuganj in Bangladesh, and the feasibility study was conducted. A total of 467t/d of NGL as raw material is transported from the Sylhet section to the plant site by pipeline with 175km distance and 6 inch diameter. In this project, this NGL is rectified to produce LPG of 123t/d, MS of 262t/d and HSD of 82t/d. As a result of the study, the substitution energy effect in this project is approximately 45,000 toe/y. The greenhouse effect gas emission is reduced by 861,000 t-CO2/y by converting the residential/commercial use fuel from firewood as biomass fuel to LPG. The ROI before tax is 19.24% in 20 years, which predicts a high earning rate. (NEDO)

  6. Report on the survey in fiscal 1998. Basic survey on promotion of the joint implementation (a survey on improvement in wastes treatment system in Tapioka starch manufacturing plants); 1998 nendo chosa hokokusho. Kyodo jisshi nado suishin kiso chosa (Tapioka denpun kako kojo no haikibutsu shori no kaizen chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In order to promote the joint implementation based on COP3, a survey and a discussion were given on improvement in wastes treatment systems and reduction of greenhouse effect gas emission in Tapioka starch manufacturing plants scattered in Indonesia. Currently, the wastes are disposed untreated, discharging methane gas into atmosphere as a result of putrefaction and contamination. Ten factories were picked up as the object of the survey. The following processes are to be adopted as the most suitable method for treating waste water and waste substances: solids (peels and fibers) are composted, and rinsing waste water is subjected to simple aerobic treatment; purified waste water is recovered of methane gas by means of anaerobic treatment; and the reduction amount of greenhouse effect gas converted to CO2 is estimated to reach 314,824 tons per year in total of the ten factories. If the carbon dioxide discharge right can be transacted at a sales price of a dollar per ton, assuming the compost sales price at 200 Rp./kg, the IRR will be 10% or higher, making the project very highly profitable. An IRR of 8% may not be assured unless the discharge right can be sold at 5 dollars per ton if the compost sales price is 150 Rp./kg. The Indonesian Government expects financial assistance from Japan for the pilot plant demonstration. (NEDO)

  7. Basic investigation on promotion of joint implementation in fiscal 2000. Investigations on modification and improvement project for Potoshani district heating and heat supplying facilities in Romania; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Romania koku Potoshani chiiki danbo netsukyokyu setsubi no kaishu oyobi kaizen keikaku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Discussions have been given on the improvement and modification project intended of saving energies and reducing greenhouse gas emission in the Potoshani district heating and heat supplying facilities in Romania. Thirty years have elapsed since the building of the Potoshani district heating and heat supplying facilities, whereas noticeable energy loss has occurred due to aged deterioration, such as thermal efficiency decrease, performance decrease, and hot water leakage due to piping corrosion. The present project is intended to improve the heat production and power generation facility efficiencies, and reduce the heat loss in heat transportation and distribution to less than 5%. The improvements will be implemented by replacing and rehabilitating the existing boilers, replacing the turbine generators, and replacing the transportation and distribution pipelines and heat exchangers. As a result of the discussions, the present project is estimated to result in annual fuel conservation of 35,820 tons of crude oil equivalent, and annual reduction of the greenhouse gas emission of 110,835 t-CO2. The total amount of the initial investment for the project would be 11.369 billion yen, and the payback period would be 12 years. The project will produce profit of 31.358 billion yen in 20 years, thus the project is financially feasible. (NEDO)

  8. FY 2000 report on the basic survey to promote Joint Implementation, etc. Environmental improvement and energy conservation measures in Pakistan Steel, a state-run enterprise in Pakistan; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Pakistan koku kokuei Pakistan Steel ni okeru kankyo kaizen sho energy taisaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the state-run plant of Pakistan Steel in Pakistan, an investigational study was conducted on energy conservation and reduction in greenhouse effect gas emission. In the project, energy conservation technology on the following was tried to be introduced: coke oven coal moisture control (CMC) equipment, sintering cooler waste heat recovery equipment, blast furnace hot stove waste heat recovery equipment, blast furnace pulverized coal injection (PCI) equipment, blast furnace top pressure recovery turbine (TRT) equipment, and hot strip mill heating furnace regenerative type burner equipment. Further, in the project on environmental improvement, studies were made on coke oven environmental improvement and blast furnace cast house dust collection. The results of the study indicated that economical effects of the energy conservation project were considered as low because the unit price of energy of Pakistan Steel is low. However, substitution of the low-priced domestic coal for the imported coal has a good effect, and energy conservation in the TRT power generation and by the regenerative type burner produces a highly economical effect. Therefore, Pakistan Steel also agrees to positively promote the project. Moreover, concerning the environmental improvement project, it was considered that the necessity of the project is high in the relation of the coke oven aimed at reducing emissions of toxic substances. (NEDO)

  9. Fiscal 2000 survey report on rationalization project for international energy conservation, technological dissemination project for international energy conservation, and Green Helmet Project. Japan-China alternative energy seminar/waste disposal; 2000 nendo kokusai energy shiyo gorika nado taisaku jigyo, kokusai energy shohi koritsuka nado gijutsu fukyu jigyo, green helmet jigyo chosa hokokusho. Nicchu sekiyu daitai energy seminar haikibutsu shori

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper explains the Japan-China alternative energy seminar (February 28 and March 1, 2001, at Beijing). The purpose of the seminar is to introduce systematic and three-dimensional or land/sea/air measures for waste disposal including recycling in Japan, to provide guidance of measures in improving recognition and methods for waste disposal in China, and also to contribute to the dissemination and promotion of a model project for effectively utilizing waste heat from rubbish incineration, a project being implemented in Harbin City now. The activities of NEDO were introduced, with emphasis placed on a model program, called Green Aid Project, for managing heat from waste incineration. On the subjects of sustainable development, urban environment, and energy, the policy of China's tenth five-year plan was demonstrated, and the treatment of wastes in China was also explained. The present state of waste processing in Japan was introduced, as was its maintenance of the facilities. Concerning Japan's waste processing technologies and characteristics of the equipment, there were presented non-incineration processing including crushing/separating, RDF, compost, methane fermentation, etc.; incineration plants; and each of the technologies such as combustion, exhaust gas, ash treatment, use of remaining heat, and gasification melting. (NEDO)

  10. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project for the modernization of general industry use boilers at the industrial complex in Namping City, Fujian Province, China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku Fukkensho Namping shi danchi no ippan sangyoyo boiler kindaika jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was conducted of the project for energy conservation and greenhouse effect gas reduction by introducing the energy utilization system combined with CCS equipment and cogeneration system to general industry plants at the industrial complex in Namping City, Fujian Province, China. As a result of the field survey, it was concluded that the capacity suitable for CCS center was 200,000 t/y and the size suitable for pulverized coal boiler at each site was 35 t/h. The energy conservation amount in this project was the coal use reduction amount by 88,000 t/y (48,000 toe/y), and the greenhouse effect gas reduction amount was approximately 90,000 t-CO2/y. As to the economical efficiency of the project, the period of ROI was about 5.1 years, and the internal earning rate at each site was 14-23%. The materialization of the project was confirmed. However, in the case of raising the required funds from city banks in China, financing conditions are strict, and the financing seems to be difficult at each site. It is necessary to raise low-interest funds such as the special environment yen credit. (NEDO)

  11. Report on the FY 1995 basic survey for industrialization related to the survey of overseas geological structure (Pondok Labu East area, Indonesia). Data attached 3 (BIP survey report); 1995 nendo kaigai chishitsu kozo nado chosa ni kakawaru kigyoka kiso chosa (Indonesia Pondok Labu higashi chiku) hokokusho. Tenpu shiryo 3 (BIP chosa hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The survey was conducted based on 'Scope of work for detailed coal exploration in the Pondok Labu East area of East Kalimantan Province, Kalimantan, Indonesia' concluded on June 16, 1995 between NEDO and P.T. Tanito Harum which owns the mining right. This is a BIP survey report. The strike/dip read from the isobath diagram drawn from the result of the boring little agreed with the stratification in the BIP survey. The BIP stratification is greater in strike and dip than in depth. The latter possibly includes false beds and surfaces cut-off/separated by channel, but roughly speaking the structure becomes such a structure as in the isobath diagram. It suggests that there is local undulation everywhere. Judging from the appearance frequency of open type cracks and the size of hole, there are no problems of the crack type decline at frequency of less than one per 5m at the time of drilling mine roadway. The state of upper/lower basement was not good. Refer to the paper (JN9940854). (NEDO)

  12. Fiscal 1997 report on the model project for the effective energy consumption in developing countries. Survey of changes of energy conservation technology and environmental protection technology in the oil refining industry in Japan; 1997 nendo chosa hokokusho. Hatten tojokoku energy shohi koritsuka model jigyo (Nippon sekiyu seiseigyo ni okeru sho energy gijutsu to kankyo taisaku gijutsu no hensen chosa hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For global scale measures to be taken for environmental protection, it becomes more and more important in the future to positively transfer and spread energy conservation technologies of Japan to overseas countries. Especially, it is effective for both economic growth in the Asian region and global environmental protection to transfer technologies which the oil refining industry has been developing and accumulating. Energy conservation in the oil refining industry means the energy conservation by strengthening the operational control at the first and second oil crises in the first stage, the energy conservation in the second stage which was accompanied by small and medium scale plant/equipment investments during several years after the first stage, and the energy conservation in the third stage which was accompanied by large scale investments from the first half of the 1980s to the present, resulting in improvement of 40% over before the first oil crisis. As to environmental protection measures, measures to reduce waste from oil refinery against air pollution and water pollution were prepared by the first half of the 1970s, and technologies were established of waste water treatment, flue gas desulfurization and denitrification. A lot of facilities for improvement of product quality and for low pollution were installed. In addition to environmental technologies, also in other industries, there were seen the heightening of thermal efficiency of kiln and thermal efficiency of cooling technique of clinker cooler in the cement industry and the improvement of productivity in the paper/pulp industry. 360 figs., 62 tabs.

  13. FY2000 report of the research results of medical/engineering cooperative research project, basic research on systems for minimally invasive diagnostic/treatment of circulatory system diseases, including prognostic diagnosis; 2000 nendo igaku kogaku renkeigata kenkyu jigyo, junkankikei shikkan ni taisuru yogo shindan wo fukumu teishinshu shindan chiryo system ni kansuru kiso kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The basic researches on minimally invasive diagnostic/treatment systems are conducted for circulatory system diseases, and the FY 2000 results are reported. The program for developing the heart surgery supporting manipulator includes development of the manipulator of 7 degree of freedom and fail-safe mechanisms to be incorporated in the patient-side system, and research and development of the heart motion compensation type robot system. The program for developing the diagnosis/treatment system aided by intravascular optical analysis includes development of intravascular endoscopy by the aid of LED emitting blue color of high brightness, and automatic analyzer for the in vivo vascular endothelial cell functions. The program for the minimally invasive diagnostic system includes development of superimposing system for integrating the images by the NOGA system and cine-coronary angiography. The other R and D items include artificial vascular systems to be put in the blood vessels, adhesives for a living body, suture instruments for fine blood vessels, heart surgery supporting system, based on the infrared spectroscopy, endoscopic system for the cranical bones, arterialization method, and gene-aided treatment. (NEDO)

  14. Study on the optium operation of the solar assisted air-source heat pump system. Part 5. ; Fundamental performance of a SOL-AIR PANEL effected by environmental condition that can be controlled artifically. SOL-AIR heat pump system no saiteki untenho ni kansuru kenkyu. 5. ; Jinko kankyo joken hendo ni uoru shuhonetsu panel no kiso tokusei

    Energy Technology Data Exchange (ETDEWEB)

    Nakajima, Y; Ohashi, K; Kasuya, A [Kogauin Univ., Tokyo (Japan); Shiraishi, K; Hino, T [Kajima Institute of Construction Technology, Tokyo (Japan)

    1990-12-06

    This paper follows the privious paper which reports about the experimental system of the solar air panel and the experimental conditions in the artificial environmental room. In this paper the basic performance of heat exchange of a solar panel related to the difference of the artificial enviromental conditions such as the wind speed, the wind direction, the radiation, and the dry or wet surface of the solar air panel, and the results of its analysis are presented. As a result of the experiment, the following were determined: wind direction affects the heat exchange characteristics of the solar air panel; the slits lead to improved heat conduction on both sides of the panel; and when the flat surface of the panel is wet the amount of all the heat exchange increases, due to increased air circulation and evaporation. It is possible to estimate the total quantity of heat exchange, and to determine the fundamental performance of a solar air panel. 7 refs., 10 figs.

  15. FY 2000 report on the basic survey to promote the joint implementation. Potential survey of the greenhouse effect gas reduction by high-efficient utilization of the oil residue in Bataan Refinery in the Philippines; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Philippines koku Bataan seiyusho ni okeru sekiyu zansa kokoritsu riyo ni yoru onshitsu koka gas sakugen kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of reducing the CO2 emitted from electricity/vapor supply facilities of Bataan Refinery in the Philippines, study was conducted of optimum energy supply facilities considering the effective use of the oil residue and future reinforcement of the refinery. Concerning the high-pressure/high-temperature condensing extraction boiler/turbine cogeneration, gas turbine cogeneration and low speed diesel engine cogeneration, comparative study was carried out in terms of thermal efficiency, reliability/preservation, environmental acceptability, effectiveness of measures for the future excessive oil residue, etc. As a result, the study was concluded as follows: the electric power consumption will markedly increase in the future; however, in the light of the situation of the refinery where the vapor demand will not increase, it is the most suitable to use low speed diesel engine cogeneration facilities as on-site power generation facilities which can burn the excessively increasing oil residue as direct fuel. The CO2 reduction effect estimated from the project on the present scale was 132,880 t-CO2/y, and the energy conservation effect estimated was 50,861 toe/y. (NEDO)

  16. FY 2000 report on the survey project on the policy for international energy utilization rationalization, etc. - model project on the heightening of international energy consumption efficiency. Viability survey of the project on energy conservation in the urea synthesis process in India; 2000 nendo kokusai energy shiyo gorika nado taisaku jigyo - kokusai energy shohi koritsuka nado model jigyo chosa hokokusho. Indo ni okeru nyoso gosei process sho energy jigyo jisshi kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas, a remodeling project was studied of urea plants constructed from the 1960s to the 1970s. Conditions for being companies for study are as follows: company has a production scale of more than 0.2 million t/y, adopts the complete circulation method, and will continue operation. And, Duncans Industries Ltd. (DIL) was selected. DIL owns the ammonia plant of 3 series x 400 t/d and the urea plant of 3 series x 682 t/d. In the modeling, stripper and carbamate condenser are added to the existing reactor as the main equipment. As a result of the study, the energy conservation effect was 13,667 toe/y, and the amount of reduction in greenhouse effect gas was 42,289 t-CO2/y. The total amount of this project was roughly estimated at 1.517 billion yen. By carrying out the project, the urea production cost is reduced approximately $9/t, but the project becomes unprofitable if the urea price is based on $188.1/t. (NEDO)

  17. FY 2000 report on the results of the project for measures for rationalization of the international energy utilization - the model project for the heightening of efficiency of the international energy consumption. 2/2. Model project for facilities for effective utilization of by-producing exhaust gases from chemical plant, etc.; 2000 nendo kokusai energy shohi koritsuka tou moderu jigyo seika hokokusho. Kagaku kojo fukusei haigasu tou yuko riyo setsubi moderu jigyo (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of contributing to the reduction in the energy consumption in China and the stable energy supply in Japan by heightening efficiency of the energy utilization in the petrochemical industry which is an industry of much energy consumption in China, a model project for facilities for effective utilization of by-producing gases from chemical plant, etc. was carried out, and the FY 2000 results were reported. Concretely, the combustion incinerator and combustion exhaust gas recovery facilities for waste water and gas were to be installed at acrylonitrile plant of petrochemical plant in China to recover the combustion exhaust gas as process gas used in plant for effective utilization. In this fiscal year, the detailed design and supply of electric instrumentation equipment and manufacture of boiler facilities were carried out according to the basic design made in the previous fiscal year. Further, the equipment manufactured in the previous year and this fiscal year were transported and inspected. The paper also reviewed drawings of the design of the facilities for part of which China takes responsibility. The separate volume (2/2) included drawings of valve, fire detector, orifice, thermocouple, motor control equipment, etc. (NEDO)

  18. Fiscal 1996 project on the modeling for effective energy consumption in developing countries under a consignment from NEDO. Recent on the results of the demonstrative study on scrap preheater of electric furnace in the iron making process (for public); 1996 nendo hatten tojokoku energy shohi koritsuka model jigyo Shin Energy Sangyo Gijutsu Sogo Kaihatsu Kiko itaku. Seitetsu katei ni okeru denkiro no genryo yonetsu sochi ni kakawaru jissho kenkyu seika hokokusho (kokaiyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Indonesia is the biggest iron steel producing country in the ASEAN countries. Most of the production is produced by the electric furnace method in which iron steel scrap is used as a material. However, an energy saving measure in this method, the electric furnace scrap preheater using flue gas, has not yet been spread on a full scale. This R and D is aimed at developing jointly with Indonesia an electric furnace scrap preheater for medium/small size electric furnaces which are adoptable to the present iron making situation in Indonesia and installing it to the electric furnace of the iron making plant in Indonesia for a demonstrative study on energy saving, etc. Spread/expansion of the electric furnace scrap preheater which is an excellent energy saving system targeted expansion of energy saving technology not only of Indonesia, but of ASEAN countries and Japan. In this fiscal year, remodeling of part of the system was made by change of flue gas flow for increasing the energy saving effect, and at the same time, a research study was made of a scrap reheater effective as a total system. Moreover, the paper investigated technical data/information in Japan and overseas. 3 figs., 9 tabs.

  19. FY 2000 report on the results of the project for measures for rationalization of the international energy utilization - the model project for the heightening of efficiency of the international energy consumption. 1/2. Model project for facilities for effective utilization of by-producing exhaust gases from chemical plant, etc.; 2000 nendo kokusai energy shohi koritsuka tou moderu jigyo seika hokokusho. Kagaku kojo fukusei haigasu tou yuko riyo setsubi moderu jigyo (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of contributing to the reduction in the energy consumption in China and the stable energy supply in Japan by heightening efficiency of the energy utilization in the petrochemical industry which is an industry of much energy consumption in China, a model project for facilities for effective utilization of by-producing gases from chemical plant, etc. was carried out, and the FY 2000 results were reported. Concretely, the combustion incinerator and combustion exhaust gas recovery facilities for waste water and gas were to be installed at acrylonitrile plant of petrochemical plant in China to recover the combustion exhaust gas as process gas used in plant for effective utilization. The plant at installation site has been run since 1995, having a production capacity of 50,000-60,000 tons. In this fiscal year, the detailed design and supply of electric instrumentation equipment and manufacture of boiler facilities were carried out according to the basic design made in the previous fiscal year. Further, the equipment manufactured in the previous year and this fiscal year were transported and inspected. The paper also reviewed drawings of the design of the facilities for part of which China takes responsibility. (NEDO)

  20. Fiscal 1997 survey report on the jointly executed/promoted basic survey project (the jointly executed activity Japan Program). Feasibility survey for CO2 reduction by deregulating heavy traffic at specified crossings in Bangkok, Thailand; 1997 nendo chosa hokokusho (kyodo jisshi suishin kiso chosa jigyo (kyodo jisshi katsudo Japan program)). Taikoku Bangkok no tokutei kosaten ni okeru kotsu jutai kanwa ni yoru CO2 sakugen kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The monetary crisis in Thailand with the baht drop in July 1997 as a beginning rapidly worsened the Thai economy. With it, the number of automobiles sold sharply declined, and automobile manufacturers were also heavily damaged as seen in the temporary discontinued production, etc. Under such economic situation, a discussion was made on execution of the project with the Thai Automotive Industry Association (TAIA), a partner at the Thai side. As a result, agreement was made on the positioning of the project, role sharing, and selection of measures against heavy traffic as follows: Japan Automobile Manufacturers Association (JAMA) conducts a feasibility study, proposal of a construction plan and confirmation of effects, and bears the costs. TAIA bears the execution and cost of construction (Due to the worsened Thai economy, JAMA paid almost all the construction expenses). In the light of the economic situation in Thailand, `improvement of the signal control system` was selected as an execution candidate, which has the highest cost effect among the measures against heavy traffic. In the future, the application, registration and execution are done for joint activities for the project. 49 figs., 59 tabs.

  1. FY 2000 report on the survey of long-term energy technology strategy, etc. - Fundamental survey to work out the industrial technology strategy. Research survey on analysis of trends of technical innovation in Japan/Europe/the U.S.; 2000 nendo choki energy gijutsu senryaku nado ni kansuru chosa hokokusho. Sangyo gijutsu senryaku sakutei kiso chosa (Nichibeio no gijutsu kakushin doko no bunseki ni kansuru chosa kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For survey of the industrial competitive force, it is important to arrange the environment where the continuous and spontaneous technical innovation is generated. To recognize the present situation, the patent information relating to technical innovation, etc. were collected, indices of the number of patent, degree of the reference and scientific link in Japan, the U.S., and Europe were taken out by technology field to analyze the patent trend in the past 10 years. By technology field, the U.S. is superior in a lot of fields. Japan is at top rank in office supplies and camera fields, made strenuous efforts in automobile and semiconductor/electronic fields, but is behind others in medicine, biotechnology and aerospace fields. Concerning the number of patent registration in the U.S., Japan is superior to the U.S. in automobile/electric equipment/metal industries. Europe is superior in food and engineering fields. The U.S. is superior in aerospace industry and biotechnology fields. The U.S. is featured by a large number of patent applications by universities and government organizations. (NEDO)

  2. Fundamental cooperation project in fiscal 2000 for improving international energy consumption efficiency. Investigations in relation with prevention of global warming (analytical comparison centering around cost effectiveness related to greenhouse effect gas (GHG) reduction in overseas countries); 2000 nendo kokusai energy shohi koritsu ka chosa nado kyoryoku kiso jigyo - chikyu ondanka boshi kanren chosa hokokusho. Kaigai deno GHG sakugen ni kansuru hiyo tai koka wo chushin to shita bunseki hikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In order to provide discussion materials for measures to achieve the GHG emission reduction target, investigations and discussions have been made on the following subjects: cost effectiveness of reducing GHG emission by target countries and target technologies, use of maps and databases on the possible reduction quantity of GHG emission, the targeted countries and business categories. Regarding the target countries, investigations were made on the general situation of the energy consumption efficiency, difference between their energy consumption efficiency by industries and that in Japan, and the GHG emission quantities by sectors. As a result, 31 counties hopeful in reducing CO2 emission were selected. With regard to technologies to reduce CO2 emission, technologies having been practically used and proliferated in Japan were used as the base, whereas 43 technologies were systematized for such departments as industries, business operations, households, and transportation. According to a trial calculation on the effect of CO2 emission reduction, if the 43 technologies are applied to the 31 target countries, CO2 emission reduction of 698 million tons as a whole would be possible, for which the required expense was calculated as 114.4 trillion yen. In evaluating the CO2 emission reducing technologies, the cost effectiveness of each technology was evaluated by cost per GHG emission reduction of 1t-CO2. (NEDO)

  3. FY 2000 report on the basic survey to promote Joint Implementation, etc. Feasibility study of the effective utilization of by-product high-sulfur concentration petroleum coke at Fujian Petrochemical Co. Ltd., Fujian Province, China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku sekiyu kako shudan koji fukusei ren'yu kako yugen koji Fujian koio nodo sekiyu cokes no yuko riyo ni kansuru F/S chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, an investigational study was conducted for the project on the effective utilization of high-sulfur petroleum coke at Fujian Petrochemical Co., Fujian Province, China. In the project, IGCC (integrated gasification combined cycle) power generation facilities are introduced to the refinery of Fujian Petrochemical Co. By gasifying the residues produced from the refinery as raw material, the gas clean the same as natural gas is produced and is used as power generation use fuel. As a result of the study, the energy conservation amount was 94,300 toe/y, and was 1,414,500 toe in cumulative amount during 15 years. Further, the amount of greenhouse effect gas reduction was 291,600 t-CO2/y, and was 4,374,000 t-CO2 in cumulative amount during 15 years. The construction cost of the project is approximately 29.7 billion yen. The annual profit to be obtained from the project is approximately 8.66 billion yen, which is indicated by difference between before and after the implementation of the project. The calculated years required for return of investment were 3.4. (NEDO)