WorldWideScience

Sample records for kanamycin test system

  1. Ultra-sensitive detection of kanamycin for food safety using a reduced graphene oxide-based fluorescent aptasensor

    Science.gov (United States)

    Ha, Na-Reum; Jung, In-Pil; La, Im-Joung; Jung, Ho-Sup; Yoon, Moon-Young

    2017-01-01

    Overuse of antibiotics has caused serious problems, such as appearance of super bacteria, whose accumulation in the human body through the food chain is a concern. Kanamycin is a common antibiotic used to treat diverse infections; however, residual kanamycin can cause many side effects in humans. Thus, development of an ultra-sensitive, precise, and simple detection system for residual kanamycin in food products is urgently needed for food safety. In this study, we identified kanamycin-binding aptamers via a new screening method, and truncated variants were analyzed for optimization of the minimal sequence required for target binding. We found various aptamers with high binding affinity from 34.7 to 669 nanomolar Kdapp values with good specificity against kanamycin. Furthermore, we developed a reduced graphene oxide (RGO)-based fluorescent aptasensor for kanamycin detection. In this system, kanamycin was detected at a concentration as low as 1 pM (582.6 fg/mL). In addition, this method could detect kanamycin accurately in kanamycin-spiked blood serum and milk samples. Consequently, this simple, rapid, and sensitive kanamycin detection system with newly structural and functional analysis aptamer exhibits outstanding detection compared to previous methods and provides a new possibility for point of care testing and food safety.

  2. Physicochemical characteristics of the kanamycin-lyophilized kit

    International Nuclear Information System (INIS)

    Eva Maria Widyasari; Misyetti; Teguh Hafiz Ambar W; Witri Nuraeni

    2013-01-01

    Kanamycin is a broad-spectrum antibiotic and usually used for the treatment of infections when antibiotics like penicillin are less powerful and can not be given. This research was performed to obtain several physicochemical character of 99m Tc-kanamycin which were made in the form of lyophilized kanamycin kit to ensure the later application in humans. Kanamycin diagnostic kit were provided in lyophilized kit comprising kanamycin as ligand compound, pyrophosphate as co-ligand and SnCl 2 as reducing agent. The radiochemical purity was determined by instant thin layer chromatography (ITLC-SG) using 0.5 N NaOH as the mobile phase and ascending paper chromatography using Whatman paper 3 with acetone as the mobile phase. The plasma binding protein of 99m Tc-kanamycin was investigated in vitro by precipitation method using 5% of trichloro acetic acid (TCA) solution, whereas the lipophilicity (log P) was obtained by determination the partition coefficient in organic solvent-water system. Studies on the effect of the amount of radioactivity and the volume of Na 99m TcO 4 solution to the radiochemical purity of 99m Tc-kanamycin were also performed. From this experiment it was obtained that kanamycin lyophilized-kit was hydrophilic, 59.54% of solutions bound to plasma, radiochemical purity was more than 95%, and the final volume of 2 ml dosage was stable up to 2 hours after the addition of 99m Tc with a radioactivity of less then 3 mCi. (author)

  3. Analysis of the Kanamycin in Raw Milk Using the Suspension Array

    Directory of Open Access Journals (Sweden)

    Yanfei Wang

    2013-01-01

    Full Text Available With the monoclonal antibody against kanamycin being prepared successfully, a bead-based indirect competitive fluorescent immunoassay was developed to detect kanamycin in milk. The fact that there was no significant cross-reaction with other aminoglycoside antibiotics implied that the monoclonal antibody was highly specific for kanamycin. The limit of detection (LOD and the 50% inhibition concentration (IC50 in raw milk were 3.2 ng/mL and 52.5 ng/mL, respectively. Using the method developed in this study, the kanamycin concentrations were monitored in raw milk after the intramuscular administration of kanamycin in sick cows. Compared to the conventional enzyme-linked immunosorbent assay (ELISA, the method using the suspension array system was more sensitive. The results obtained in the present study showed a good correlation with that of the ELISA.

  4. Kill rate of mastitis pathogens by a combination of cefalexin and kanamycin.

    Science.gov (United States)

    Maneke, E; Pridmore, A; Goby, L; Lang, I

    2011-01-01

    To assess the bacterial killing rate produced by a combination of cefalexin and kanamycin at two different concentration ratios. Time-kill kinetics of cefalexin and kanamycin, individually and in combination, were determined against one strain each of Escherichia coli, Staphylococcus aureus, Streptococcus agalactiae, Streptococcus dysgalactiae and Streptococcus uberis. The combination was tested using two fixed ratios (cefalexin : kanamycin ratios of 1·25 : 1 and 1 : 2·3) and two concentrations of each ratio. Time-kill curves produced with either ratio were quite similar. Against most bacterial species, higher concentrations produced faster kill. In all cases, the combination of cefalexin and kanamycin showed faster and greater kill at lower antibiotic concentrations than those observed with either drug alone. The combination of cefalexin and kanamycin results in a fast initial killing of major mastitis pathogens at both concentration ratios. The combination of cefalexin and kanamycin achieved rapid bacterial kill at concentrations and ratios that can be achieved in vivo following intramammary infusion of a mastitis treatment. © 2010 Boehringer Ingelheim Vetmedica GmbH. Journal of Applied Microbiology © 2010 The Society for Applied Microbiology.

  5. Synthesis and antibacterial activity of 1-N-(1,3-dihydroxy-2-propyl)kanamycin B (UK-31,214).

    Science.gov (United States)

    Richardson, K; Brammer, K W; Jevons, S; Plews, R M; Wright, J R

    1979-10-01

    1-N-(1,3-Dihydroxy-2-propyl)kanamycin B was prepared and its in vitro activity against aminoglycoside-sensitive and aminoglycoside-resistant organisms was compared with that of kanamycin B and gentamicin. This kanamycin B derivative (code No. UK-31,214) demonstrated potent activity in all of these tests and gave good protection in experimental infections in mice.

  6. Synthesis, quality control and biodistribution of 99mTc-Kanamycin

    International Nuclear Information System (INIS)

    Roohi, S.; Mushtaq, A.; Jehangir, M.; Malik, S.A.

    2006-01-01

    Kanamycin is an antibiotic used for treatment of infections when penicillin or other less toxic drugs cannot be used. Kanamycin was labeled with technetium-99m pertechnetate using SnCl 2 x 2H 2 O as reducing agent. The labeling efficiency depends on the ligand/reductant ratio, pH, and volume of reaction mixture. Radiochemical purity and stability of 99m Tc-Kanamycin was determined by thin layer chromatography. Biodistribution studies of 99m Tc-Kanamycin were performed in rats and rabbits. A significantly higher accumulation of 99m Tc-Kanamycin was seen at sites of S. aureus infected animals (rat/rabbit). (author)

  7. Topical kanamycin: an effective therapeutic option in aerobic vaginitis.

    Science.gov (United States)

    Tempera, G; Abbadessa, G; Bonfiglio, G; Cammarata, E; Cianci, A; Corsello, S; Raimondi, A; Ettore, G; Nicolosi, D; Furneri, P M

    2006-08-01

    Eighty-one patients with clinical diagnosis of aerobic vaginitis (AV) were included in the study. The patients were randomized for treatment, 45 with kanamycin (100 mg vaginal ovules for 6 days, consecutively) and 36 with meclocycline (35 mg vaginal ovules for 6 days, consecutively). The patients were examined before starting the study, 1-2 days after treatment and 30 days after the end of the study. At the first follow-up the patients showed different levels of symptom reduction. Reduction in the presence of leukocytes, vaginal mucosa burning and itching were statistically significant in the group treated with kanamycin with respect to the group treated with meclocycline. Moreover, there was also reduced isolation of Enterobacteriaeae (97%) in the group treated with kanamycin versus those treated with meclocycline (76%). At the second follow-up, vaginal homeostasis (normalization of pH and presence of lactobacilli) was more evident in the kanamycin-treated group. In conclusion, our data suggest that the topical use of kanamycin could be considered a specific antibiotic for the therapy of this new pathology.

  8. Synthesis and antibacterial activities of 1-N [(S)-omega-amino-2-hydroxyalkyl] kanamycin A derivatives.

    Science.gov (United States)

    Richardson, K; Jevons, S; Moore, J W; Ross, B C; Wright, J R

    1977-10-01

    Four 1-N-aminohydroxy-alkyl derivatives of kanamycin A were prepared and their in vitro activities against aminoglycoside-sensitive and aminoglycoside-resistant organisms were compared with amikacin. 1-N-[(S)-4-Amino-2-hydroxybutyl] kanamycin A (Fig. 1, compound 2, code no. UK-18,892) was equipotent to amikacin in all these tests and in mouse protection studies.

  9. Kanamycin resistance during in vitro development of pollen from transgenic tomato plants

    NARCIS (Netherlands)

    Bino, R.J.; Hille, J.; Franken, J.

    1987-01-01

    Effects of kanamycin on pollen germination and tube growth of pollen from non-transformed plants and from transgenic tomato plants containing a chimaeric kanamycin resistance gene were determined. Germination of pollen was not affected by the addition of kanamycin to the medium in both genotypes.

  10. 21 CFR 524.1200b - Kanamycin ophthalmic aqueous solution.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Kanamycin ophthalmic aqueous solution. 524.1200b... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS OPHTHALMIC AND TOPICAL DOSAGE FORM NEW ANIMAL DRUGS § 524.1200b Kanamycin ophthalmic aqueous solution. (a) Specifications. The drug, which is in an aqueous...

  11. Improved methods in Agrobacterium-mediated transformation of almond using positive (mannose/pmi) or negative (kanamycin resistance) selection-based protocols.

    Science.gov (United States)

    Ramesh, Sunita A; Kaiser, Brent N; Franks, Tricia; Collins, Graham; Sedgley, Margaret

    2006-08-01

    A protocol for Agrobacterium-mediated transformation with either kanamycin or mannose selection was developed for leaf explants of the cultivar Prunus dulcis cv. Ne Plus Ultra. Regenerating shoots were selected on medium containing 15 muM kanamycin (negative selection), while in the positive selection strategy, shoots were selected on 2.5 g/l mannose supplemented with 15 g/l sucrose. Transformation efficiencies based on PCR analysis of individual putative transformed shoots from independent lines relative to the initial numbers of leaf explants tested were 5.6% for kanamycin/nptII and 6.8% for mannose/pmi selection, respectively. Southern blot analysis on six randomly chosen PCR-positive shoots confirmed the presence of the nptII transgene in each, and five randomly chosen lines identified to contain the pmi transgene by PCR showed positive hybridisation to a pmi DNA probe. The positive (mannose/pmi) and the negative (kanamycin) selection protocols used in this study have greatly improved transformation efficiency in almond, which were confirmed with PCR and Southern blot. This study also demonstrates that in almond the mannose/pmi selection protocol is appropriate and can result in higher transformation efficiencies over that of kanamycin/nptII selection protocols.

  12. In vitro drug susceptibility of Mycobacterium tuberculosis for amikacin, kanamycin and capreomycin.

    NARCIS (Netherlands)

    Dijkstra, J A; van der Laan, T; Akkerman, O W; Bolhuis, M S; de Lange, W C M; Kosterink, J G W; van der Werf, T S; Alffenaar, J W C; van Soolingen, D

    2018-01-01

    Amikacin, kanamycin and capreomycin are listed among the most important 2nd line drugs for multidrug resistant tuberculosis. Although amikacin and kanamycin are administered in the same dose and show the same pharmacokinetics, they have different WHO breakpoints suggesting that the two drugs have a

  13. Label-free detection of kanamycin based on a G-quadruplex DNA aptamer-based fluorescent intercalator displacement assay

    Science.gov (United States)

    Xing, Yun-Peng; Liu, Chun; Zhou, Xiao-Hong; Shi, Han-Chang

    2015-01-01

    This work was the first to report that the kanamycin-binding DNA aptamer (5'-TGG GGG TTG AGG CTA AGC CGA-3') can form stable parallel G-quadruplex DNA (G4-DNA) structures by themselves and that this phenomenon can be verified by nondenaturing polyacrylamide gel electrophoresis and circular dichroism spectroscopy. Based on these findings, we developed a novel label-free strategy for kanamycin detection based on the G4-DNA aptamer-based fluorescent intercalator displacement assay with thiazole orange (TO) as the fluorescence probe. In the proposed strategy, TO became strongly fluorescent upon binding to kanamycin-binding G4-DNA. However, the addition of kanamycin caused the displacement of TO from the G4-DNA-TO conjugate, thereby resulting in decreased fluorescent signal, which was inversely related to the kanamycin concentration. The detection limit of the proposed assay decreased to 59 nM with a linear working range of 0.1 μM to 20 μM for kanamycin. The cross-reactivity against six other antibiotics was negligible compared with the response to kanamycin. A satisfactory recovery of kanamycin in milk samples ranged from 80.1% to 98.0%, confirming the potential of this bioassay in the measurement of kanamycin in various applications. Our results also served as a good reference for developing similar fluorescent G4-DNA-based bioassays in the future.

  14. RENAL CLEARANCE AND URINARY EXCRETION OF KANAMYCIN IN DOMESTIC RUMINANT SPECIES

    Directory of Open Access Journals (Sweden)

    I. JAVED, Z. U. RAHMAN, F. H. KHAN, F. MUHAMMAD, Z. IQBAL AND B. ASLAM

    2006-01-01

    Full Text Available Species dependent geonetical differences in renal clearance and urinary excretion of kanamycin were investigated in adult female buffaloes, cows, sheep and goats. The drug was administered as a single intravenous dose (5 mg/kg b.wt. Blood and urine samples were collected at various time intervals after drug administration. The plasma and urine concentrations of the drug were determined using the microbiological assay. The mean (± SE values for endogenous creatinine clearance (an index of glomerular filtration rate were 0.77 ± 0.05, 0.49 ± 0.07, 0.81 ± 0.07 and 0.98 ± 0.13 ml/min.kg in buffaloes, cows, sheep and goats, respectively. Experiments regarding kidney handling of kanamycin in these ruminant species revealed respective values of renal clearance as 0.08 ± 0.01, 0.07 ± 0.01, 0.19 ± 0.02 and 0.23 ± 0.04 ml/min.kg. Besides glomerular filtration, kanamycin was reabsorbed from the renal tubules of all ruminant species and actively secreted into the renal tubules of buffaloes and goats. The cumulative percentages of intravenous dose of kanamycin excreted through urine during 12 hours in buffaloes, cows, sheep and goats were 4.31 ± 0.37, 2.53 ± 0.30, 11.0 ± 1.04 and 15.8 ± 2.22, respectively. This species variation in the percentage of urinary excretion in these domestic ruminants coincides with their respective glomerular filtration rates, being the highest in goats, lowest in cows and intermediate in sheep and buffaloes.

  15. Functional characterization of KanP, a methyltransferase from the kanamycin biosynthetic gene cluster of Streptomyces kanamyceticus.

    Science.gov (United States)

    Nepal, Keshav Kumar; Yoo, Jin Cheol; Sohng, Jae Kyung

    2010-09-20

    KanP, a putative methyltransferase, is located in the kanamycin biosynthetic gene cluster of Streptomyces kanamyceticus ATCC12853. Amino acid sequence analysis of KanP revealed the presence of S-adenosyl-L-methionine binding motifs, which are present in other O-methyltransferases. The kanP gene was expressed in Escherichia coli BL21 (DE3) to generate the E. coli KANP recombinant strain. The conversion of external quercetin to methylated quercetin in the culture extract of E. coli KANP proved the function of kanP as S-adenosyl-L-methionine-dependent methyltransferase. This is the first report concerning the identification of an O-methyltransferase gene from the kanamycin gene cluster. The resistant activity assay and RT-PCR analysis demonstrated the leeway for obtaining methylated kanamycin derivatives from the wild-type strain of kanamycin producer. 2009 Elsevier GmbH. All rights reserved.

  16. Glutamate co-transmission from developing medial nucleus of the trapezoid body - Lateral superior olive synapses is cochlear dependent in kanamycin-treated rats

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Ho [Institute of Tissue Regeneration Engineering (ITREN), Dankook University, San 29, Anseo-dong, Cheonan-si, Chungnam 330-714 (Korea, Republic of); Pradhan, Jonu [Department of Nanobio Medical Science, Dankook University, San 29, Anseo-dong, Cheonan-si, Chungnam 330-714 (Korea, Republic of); Maskey, Dhiraj; Park, Ki Sup [Department of Anatomy, College of Medicine, Dankook University, San 29, Anseo-dong, Cheonan-si, Chungnam 330-714 (Korea, Republic of); Hong, Sung Hwa [Department of Otorhinolaryngology-Head and Neck Surgery, Samsung Medical Center, Sungkyunkwan University, School of Medicine, 50, Irwon-dong, Gangnam-gu, Seoul 135-710 (Korea, Republic of); Suh, Myung-Whan [Department of Otorhinolaryngology-Head and Neck Surgery, College of Medicine, Dankook University, San 29, Anseo-dong, Cheonan-si, Chungnam 330-714 (Korea, Republic of); Kim, Myeung Ju, E-mail: mjukim99@dankook.ac.kr [Department of Anatomy, College of Medicine, Dankook University, San 29, Anseo-dong, Cheonan-si, Chungnam 330-714 (Korea, Republic of); Ahn, Seung Cheol, E-mail: ansil67@hanmail.net [Department of Physiology, College of Medicine, Dankook University, San 29, Anseo-dong, Cheonan-si, Chungnam 330-714 (Korea, Republic of)

    2011-02-11

    Research highlights: {yields} Glutamate co-transmission is enhanced in kanamycin-treated rats. {yields} VGLUT3 expression is increased in kanamycin-treated rats. {yields} GlyR expression is decreased in kanamycin-treated rats. {yields} GlyR, VGLUT3 expression patterns are asymmetric in unilaterally cochlear ablated rat. -- Abstract: Cochlear dependency of glutamate co-transmission at the medial nucleus of the trapezoid body (MNTB) - the lateral superior olive (LSO) synapses was investigated using developing rats treated with high dose kanamycin. Rats were treated with kanamycin from postnatal day (P) 3 to P8. A scanning electron microscopic study on P9 demonstrated partial cochlear hair cell damage. A whole cell voltage clamp experiment demonstrated the increased glutamatergic portion of postsynaptic currents (PSCs) elicited by MNTB stimulation in P9-P11 kanamycin-treated rats. The enhanced VGLUT3 immunoreactivities (IRs) in kanamycin-treated rats and asymmetric VGLUT3 IRs in the LSO of unilaterally cochlear ablated rats supported the electrophysiologic data. Taken together, it is concluded that glutamate co-transmission is cochlear-dependent and enhanced glutamate co-transmission in kanamycin-treated rats is induced by partial cochlear damage.

  17. Microbiological/clinical characteristics and validation of topical therapy with kanamycin in aerobic vaginitis: a pilot study.

    Science.gov (United States)

    Tempera, G; Bonfiglio, G; Cammarata, E; Corsello, S; Cianci, A

    2004-07-01

    The term 'aerobic vaginitis' defines a 'new' vaginal pathology that is neither classifiable as specific vaginitis nor as bacterial vaginosis. We studied a sample of 30 women with a clinical and microbiological diagnosis of aerobic vaginitis and compared the efficacy and tolerability of kanamycin and meclocycline, two products commercially available in Italy in the form of vaginal pessaries. In chronological order of enrollment, the patients were alternately treated with kanamycin or meclocycline; the dose of administration in both groups was of one pessary per day for 6 days. The evaluation of the therapeutic efficacy was carried out both at the first check-up (7th-8th day) and at a second check-up (13th-16th day). At the first follow-up carried out immediately at the end of therapy, the percentage of normalisation of clinical signs and symptoms was increased independently of the type of treatment in the case of moderate grade aerobic vaginitis, while kanamycin was produced a better effect in the group with severe aerobic vaginitis. Furthermore, at the second follow-up, a direct correlation with recovery of vaginal homeostasis was demonstrated by the normalisation of the vaginal pH and by the presence of lactobacilli, only in kanamycin treated group. In conclusion, our results showed the validity of the treatment with kanamycin intravaginally in this recently recognised disease.

  18. The labeling of kanamycin using radionuclide of technetium as an agent for early detection of infectious deseases

    International Nuclear Information System (INIS)

    Widyasari, E.; Zainuddin, M.N.; Nuraeni, W.

    2013-01-01

    Infectious diseases are still the leading cause of death in the world. Early detection and determination of the exact location of infection and accurate imaging through the use of nuclear techniques can facilitate treatment. Antibiotics radioactive labeled compound otherwise be able to be a solution to distinguish between infective and non-infective inflammatory. Kanamycin is an antibiotic used for the treatment of infections where other drugs such as penicillin and several other drugs that are less potent infection can not be used. This study aims to determine the optimum labeling conditions of 99m Tc-kanamycin in order to obtain high labeling efficiency. Kanamycin has successfully labeled with technetium-99m through indirect labeling method using pyrophosphate as a co-ligand. Labeling efficiency and determination of radiochemical purity of these compounds simultaneously determined by ascending paper chromatography using Whatman paper 3 as the stationary phase, and acetone as the mobile phase to separate the radiochemical impurities in the form of 99m Tc-pertechnetate; while impurities in the form of reduced 99m Tc-separated by using the stationary phase ITLC-SG and 0.5 N NaOH as mobile phase. The result showed that the optimal labeling conditions was obtained on the use of 6 mg kanamycin, 300 mg SnCl2, 1.5 mg of Na-pyrophosphate, and pH = 6. The incubation time of 0-30 min at room temperature, provide labeling efficiency of 96.54 ± 0.36%. The successful of kanamycin labeling with high efficiency makes 99m Tc-kanamycin potentially to be used as a radiopharmaceutical for the early detection of infectious diseases. (author)

  19. Label-free immunosensor for the detection of kanamycin using Ag@Fe₃O₄ nanoparticles and thionine mixed graphene sheet.

    Science.gov (United States)

    Yu, Shujun; Wei, Qin; Du, Bin; Wu, Dan; Li, He; Yan, Liangguo; Ma, Hongmin; Zhang, Yong

    2013-10-15

    A highly sensitive label-free immunosensor for the detection of kanamycin had been developed using silver hybridized mesoporous ferroferric oxide nanoparticles (Ag@Fe₃O₄ NPs) and thionine mixed graphene sheet (TH-GS). TH was used as an electron transfer mediator. The electrical signal was greatly improved in the presence of GS due to its good electron-transfer ability. With the advantages of large specific surface area and excellent electrical conductivity, Ag@Fe₃O₄ NPs could immobilize more antibodies of kanamycin and promote the electron transfer. Cyclic voltammetry and square wave voltammetry were used to characterize the recognition of kanamycin. The proposed immunosensor showed good performances such as low detection limit (15 pg mL⁻¹), wide linear range (from 0.050 to 16 ng mL⁻¹), short analysis time (3 min), high stability, and good selectivity in the detection of kanamycin. The immunosensor was evaluated for pork meat sample, receiving satisfactory results. Copyright © 2013 Elsevier B.V. All rights reserved.

  20. 2,3-Dihydroxybenzoic acid attenuates kanamycin-induced volume reduction in mouse utricular type I hair cells

    DEFF Research Database (Denmark)

    Severinsen, Stig Åvall; Kirkegaard, Mette; Nyengaard, Jens Randel

    2006-01-01

    injection. Total volume of the utricle, as well as total number of hair and supporting cells, were estimated on light microscopic sections. Total volume and mean volume of hair cell types I and II and supporting cells were estimated on digital transmission electron micrographs. Total volume of the utricular...... macula, hair cell type I and supporting cells decreased significantly in animals injected with kanamycin but not in animals co-treated with DHB. Hair and supporting cell numbers remained unchanged in all three groups. In conclusion, the kanamycin-induced volume reduction of type I hair cells...

  1. Subinhibitory concentration of kanamycin induces the Pseudomonas aeruginosa type VI secretion system.

    Directory of Open Access Journals (Sweden)

    Cerith Jones

    Full Text Available Pseudomonas aeruginosa is a Gram-negative bacterium found in natural environments including plants, soils and warm moist surfaces. This organism is also in the top ten of nosocomial pathogens, and prevalent in cystic fibrosis (CF lung infections. The ability of P. aeruginosa to colonize a wide variety of environments in a lasting manner is associated with the formation of a resistant biofilm and the capacity to efficiently outcompete other microorganisms. Here we demonstrate that sub-inhibitory concentration of kanamycin not only induces biofilm formation but also induces expression of the type VI secretion genes in the H1-T6SS cluster. The H1-T6SS is known for its role in toxin production and bacterial competition. We show that the antibiotic induction of the H1-T6SS only occurs when a functional Gac/Rsm pathway is present. These observations may contribute to understand how P. aeruginosa responds to antibiotic producing competitors. It also suggests that improper antibiotic therapy may enhance P. aeruginosa colonization, including in the airways of CF patients.

  2. Cloning and over expression of non-coding RNA rprA in E.coli and its resistance to Kanamycin without osmotic shock.

    Science.gov (United States)

    Sahni, Azita; Hajjari, Mohammadreza; Raheb, Jamshid; Foroughmand, Ali Mohammad; Asgari, Morteza

    2017-01-01

    Recent reports have indicated that small RNAs have key roles in the response of the E.coli to stress and also in the regulating of virulence factors. It seems that some small non-coding RNAs are involved in multidrug resistance. Previous studies have indicated that rprA can increase the tolerance to Kanamycin in RcsB-deficient Escherichia coli K-12 following osmotic shock. The current study aims to clone and over-express the non-coding RNA rprA in E.coli and investigate its effect on the bacterial resistance to Kanamycin without any osmotic shock. For this purpose, rprA gene was amplified by the PCR and then cloned into the PET-28a (+) vector. The recombinant plasmid was transformed into wild type E.coli BL21 (DE3). The over expression was induced by IPTG and confirmed by qRT-PCR. The resistance to the kanamycin was then measured in different times by spectrophotometry. The statistical analysis showed that the rprA can increase the resistance to Kanamycin in Ecoli K12. The interaction between rprA and rpoS was reviewed and analyzed by in silico methods. The results showed that the bacteria with over-expressed rprA were more resistant to Kanamycin. The present study is an important step to prove the role of non-coding RNA rprA in bacterial resistance. The data can be the basis for future works and can also help to develop and deliver next-generation antibiotics.

  3. Rapid diagnosis of drug resistance to fluoroquinolones, amikacin, capreomycin, kanamycin and ethambutol using genotype MTBDRsl assay: a meta-analysis.

    Directory of Open Access Journals (Sweden)

    Yan Feng

    Full Text Available BACKGROUND: There are urgent needs for rapid and accurate drug susceptibility testing of M. tuberculosis. GenoType MTBDRsl is a new molecular kit designed for rapid identification of the resistance to the second-line antituberculosis drugs with a single strip. In recent years, it has been evaluated in many settings, but with varied results. The aim of this meta-analysis was to synthesize the latest data on the diagnostic accuracy of GenoType MTBDRsl in detecting drug resistance to fluoroquinolones, amikacin, capreomycin, kanamycin and ethambutol, in comparison with the phenotypic drug susceptibility test. METHODS: This systematic review followed the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA guideline. The search terms of "MTBDRsl" and "tuberculosis" were used on PubMed, EMBASE, and Web of Science. QUADAS-2 was used to assess the quality of included studies. Data were analyzed by Meta-Disc 1.4. We calculated the sensitivity, specificity, positive likelihood ratio (PLR, negative likelihood ratio (NLR, diagnostic odds ratio (DOR and corresponding 95% confidence interval (CI for each study. From these calculations, forest plots and summary receiver operating characteristic (SROC curves were produced. RESULTS: Patient selection bias as well as flow and timing bias were observed in most studies. The summarized sensitivity (95% CI was 0.874(0.845-0.899, 0.826(0.777-0.869, 0.820(0.772-0.862, 0.444(0.396-0.492, and 0.679(0.652-0.706 for fluoroquinolones, amikacin, capreomycin, kanamycin, and ethambutol, respectively. The specificity (95% CI was 0.971(0.961-0.980, 0.995(0.987-0.998, 0.973(0.963-0.981, 0.993(0.985-0.997, and 0.799(0.773-0.823, respectively. The AUC (standard error were 0.9754(0.0203, 0.9300(0.0598, 0.9885(0.0038, 0.9689(0.0359, and 0.6846(0.0550, respectively. CONCLUSION: Genotype MTBDRsl showed good accuracy for detecting drug resistance to fluoroquinolones, amikacin and capreomycin, but it may not be an

  4. Evaluation of MGIT 960 System for the Second-Line Drugs Susceptibility Testing of Mycobacterium tuberculosis

    Directory of Open Access Journals (Sweden)

    Hyejin Kim

    2013-01-01

    Full Text Available Many laboratories validate DST of the second-line drugs by BACTEC MGIT 960 system. The objective of this study is to evaluate the critical concentration and perform DST for the 2nd line drugs. We evaluated 193 clinical strains of M. tuberculosis isolated from patients in South Korea. Testing the critical concentration of six second-line drugs was performed by MGIT 960 and compared with L-J proportion method. The critical concentration was determined to establish the most one that gave the difference between drug resistance and susceptibility in MGIT960 system. Good agreement of the following concentrations was found: Concordance was 95% for 0.5 μg/mL of moxifloxacin; 93.6%, 1.0 μg/mL of levofloxacin; 97.5%, 2.5 μg/mL of kanamycin; 90.6%, 2.5 μg/mL of capreomycin; 86.2%, 5.0 μg/mL of ethionamide; and 90.8%, 2.0 μg/mL of ρ-aminosalicylic acid. The critical concentrations of the four drugs, moxifloxacin, levofloxacin, kanamycin, and capreomycin, were concordant and reliable for testing 2nd line drug resistance. Further study of ethionamide and ρ-aminosalicylic acid is required.

  5. 35S Promoter Methylation in Kanamycin-Resistant Kalanchoe (Kalanchoe pinnata L.) Plants Expressing the Antimicrobial Peptide Cecropin P1 Transgene.

    Science.gov (United States)

    Shevchuk, T V; Zakharchenko, N S; Tarlachkov, S V; Furs, O V; Dyachenko, O V; Buryanov, Y I

    2016-09-01

    Transgenic kalanchoe plants (Kalanchoe pinnata L.) expressing the antimicrobial peptide cecropin P1 gene (cecP1) under the control of the 35S cauliflower mosaic virus 35S RNA promoter and the selective neomycin phosphotransferase II (nptII) gene under the control of the nopaline synthase gene promoter were studied. The 35S promoter methylation and the cecropin P1 biosynthesis levels were compared in plants growing on media with and without kanamycin. The low level of active 35S promoter methylation further decreases upon cultivation on kanamycin-containing medium, while cecropin P1 synthesis increases.

  6. Dual Targeting of Intracellular Pathogenic Bacteria with a Cleavable Conjugate of Kanamycin and an Antibacterial Cell-Penetrating Peptide.

    Science.gov (United States)

    Brezden, Anna; Mohamed, Mohamed F; Nepal, Manish; Harwood, John S; Kuriakose, Jerrin; Seleem, Mohamed N; Chmielewski, Jean

    2016-08-31

    Bacterial infection caused by intracellular pathogens, such as Mycobacterium, Salmonella, and Brucella, is a burgeoning global health epidemic that necessitates urgent action. However, the therapeutic value of a number of antibiotics, including aminoglycosides, against intracellular pathogenic bacteria is compromised due to their inability to traverse eukaryotic membranes. For this significant problem to be addressed, a cleavable conjugate of the antibiotic kanamycin and a nonmembrane lytic, broad-spectrum antimicrobial peptide with efficient mammalian cell penetration, P14LRR, was prepared. This approach allows kanamycin to enter mammalian cells as a conjugate linked via a tether that breaks down in the reducing environment within cells. Potent antimicrobial activity of the P14KanS conjugate was demonstrated in vitro, and this reducible conjugate effectively cleared intracellular pathogenic bacteria within macrophages more potently than that of a conjugate lacking the disulfide moiety. Notably, successful clearance of Mycobacterium tuberculosis within macrophages was observed with the dual antibiotic conjugate, and Salmonella levels were significantly reduced in an in vivo Caenorhabditis elegans model.

  7. Sulfonamide-Based Inhibitors of Aminoglycoside Acetyltransferase Eis Abolish Resistance to Kanamycin in Mycobacterium tuberculosis

    Energy Technology Data Exchange (ETDEWEB)

    Garzan, Atefeh; Willby, Melisa J.; Green, Keith D.; Gajadeera, Chathurada S.; Hou, Caixia; Tsodikov, Oleg V.; Posey, James E.; Garneau-Tsodikova, Sylvie

    2016-12-08

    A two-drug combination therapy where one drug targets an offending cell and the other targets a resistance mechanism to the first drug is a time-tested, yet underexploited approach to combat or prevent drug resistance. By high-throughput screening, we identified a sulfonamide scaffold that served as a pharmacophore to generate inhibitors of Mycobacterium tuberculosis acetyltransferase Eis, whose upregulation causes resistance to the aminoglycoside (AG) antibiotic kanamycin A (KAN) in Mycobacterium tuberculosis. Rational systematic derivatization of this scaffold to maximize Eis inhibition and abolish the Eis-mediated KAN resistance of M. tuberculosis yielded several highly potent agents. A crystal structure of Eis in complex with one of the most potent inhibitors revealed that the inhibitor bound Eis in the AG-binding pocket held by a conformationally malleable region of Eis (residues 28–37) bearing key hydrophobic residues. These Eis inhibitors are promising leads for preclinical development of innovative AG combination therapies against resistant TB.

  8. Aptamer-functionalized magnetic nanoparticles for simultaneous fluorometric determination of oxytetracycline and kanamycin

    International Nuclear Information System (INIS)

    Liu, Changbin; Lu, Chunxia; Tang, Zonggui; Chen, Xia; Wang, Guohong; Sun, Fengxia

    2015-01-01

    This work describes a method for the simultaneous detection of oxytetracycline (OTC) and kanamycin (KMY) using aptamers acting as both recognition and separation elements, and complementary oligonucleotides labeled with a green emitting fluorophore (carboxyfluorescein, FAM) and a yellow emitting fluorophore (carboxy-X-rhodamine, ROX), respectively, as signal labels. An OTC aptamer and a KMY aptamer were immobilized on the surface of magnetic nanoparticles (MNPs) via avidin-biotin chemistry. The aptamers preferentially bind their respective targets and thereby cause the upconcentration of analytes. However, in their absence they bind fluorescently-tagged complementary oligonucleotide later added to the reaction system. This cause the NPs to become fluorescent, with emission peaks located at 520 and 608 nm, respectively. The effects of the concentration of avidin, aptamer, complementary oligonucleotide, incubation temperature and incubation time were optimized. Under the optimal conditions, linear relationships were obtained in the range of 1–50 ng∙mL −1 for OTC and KMY, with limits of detection of 0.85 ng∙mL −1 and 0.92 ng∙mL −1 , respectively. The method was applied to the analysis of pork, milk, and honey samples spiked with OTC and MKY. Recoveries ranged from 76.5 to 94.7 % and 77.8 to 93.1 %, respectively, and the relative standard deviation was <10.0 %. (author)

  9. Preparation and Microbiological Evaluation of Amphiphilic Kanamycin-Lipoamino Acid Ion-Pairs

    Directory of Open Access Journals (Sweden)

    Rosario Pignatello

    2014-05-01

    Full Text Available Amphiphilic ion-pairs of kanamycin (KAN were prepared by evaporation of a water-ethanol co-solution of KAN base and a lipoamino acid bearing a 12-carbon atoms alkyl side chain (LAA12, at different molar ratios. Infrared spectroscopy confirmed the structure of ion-pairs, while differential scanning calorimetry (DSC and powder X-ray diffractometry (PXRD studies supported the formation of new saline species with a different crystalline structure than the starting components. The solubility pattern shown in a range of both aqueous and organic solvents confirmed that the ion-pairs possess an amphiphilic character. The LAA12 counter-ion showed not to improve the antibacterial activity of KAN, suggesting that such chemical strategy is not able to favor the penetration of this drug inside the bacteria cells. Nevertheless, a slight improving, i.e., a one-fold dilution, was observed in E. coli. The present study can also serve as the basis for a further evaluation of LAA ion-pairing of antibiotics, as a means to improve the loading of hydrophilic drugs into lipid-based nanocarriers.

  10. Influence of tra genes of IncP and F plasmids on the mobilization of small Kanamycin resistance ColE1-Like plasmids in bacterial biofilms

    Science.gov (United States)

    Background: Horizontal gene transfer is a mechanism for movement of antibiotic resistance genes among bacteria. Some small kanamycin resistance (KanR) ColE1-like plasmids isolated from different serotypes of Salmonella enterica were shown to carry mobilization genes; although not self-transmissibl...

  11. Comparative study of kanamycin sulphate microparticles and nanoparticles for intramuscular administration: preparation in vitro release and preliminary in vivo evaluation.

    Science.gov (United States)

    Mustafa, Sanaul; Devi, V Kusum; Pai, Roopa S

    2016-11-01

    Kanamycin sulphate (KS) is a Mycobacterium tuberculosis protein synthesis inhibitor. KS is polycationic, a property responsible for KS poor oral absorption half-life (2.5 h) and rapid renal clearance, which results in serious nephrotoxicity/ototoxicity. The current study aimed to develop KS-loaded PLGA vitamin-E-TPGS microparticles (MPs) and nanoparticles (NPs) to reduce the dosing frequency and dose-related adverse effect. In vitro release was sustained up to 10 days for KS PLGA-TPGS MPs and 13 days for KS PLGA-TPGS NPs in phosphate-buffered saline (PBS) pH 7.4. The in vivo pharmacokinetic test in Wistar rats showed that the AUC 0-∞ of KS PLGA-TPGS NPs (280.58 μg/mL*min) was about 1.62-fold higher than that of KS PLGA-TPGS MPs (172.30 μg/mL*min). Further, in vivo protein-binding assay ascribed 1.20-fold increase in the uptake of KS PLGA-TPGS NPs through the alveolar macrophage (AM). The studies, therefore, could provide another useful tool for successful development of KS MPs and NPs.

  12. Autonomous assembly of synthetic oligonucleotides built from an expanded DNA alphabet. Total synthesis of a gene encoding kanamycin resistance

    Directory of Open Access Journals (Sweden)

    Kristen K. Merritt

    2014-10-01

    Full Text Available Background: Many synthetic biologists seek to increase the degree of autonomy in the assembly of long DNA (L-DNA constructs from short synthetic DNA fragments, which are today quite inexpensive because of automated solid-phase synthesis. However, the low information density of DNA built from just four nucleotide “letters”, the presence of strong (G:C and weak (A:T nucleobase pairs, the non-canonical folded structures that compete with Watson–Crick pairing, and other features intrinsic to natural DNA, generally prevent the autonomous assembly of short single-stranded oligonucleotides greater than a dozen or so.Results: We describe a new strategy to autonomously assemble L-DNA constructs from fragments of synthetic single-stranded DNA. This strategy uses an artificially expanded genetic information system (AEGIS that adds nucleotides to the four (G, A, C, and T found in standard DNA by shuffling hydrogen-bonding units on the nucleobases, all while retaining the overall Watson–Crick base-pairing geometry. The added information density allows larger numbers of synthetic fragments to self-assemble without off-target hybridization, hairpin formation, and non-canonical folding interactions. The AEGIS pairs are then converted into standard pairs to produce a fully natural L-DNA product. Here, we report the autonomous assembly of a gene encoding kanamycin resistance using this strategy. Synthetic fragments were built from a six-letter alphabet having two AEGIS components, 5-methyl-2’-deoxyisocytidine and 2’-deoxyisoguanosine (respectively S and B, at their overlapping ends. Gaps in the overlapped assembly were then filled in using DNA polymerases, and the nicks were sealed by ligase. The S:B pairs in the ligated construct were then converted to T:A pairs during PCR amplification. When cloned into a plasmid, the product was shown to make Escherichia coli resistant to kanamycin. A parallel study that attempted to assemble similarly sized genes

  13. Neuronal erythropoietin overexpression is protective against kanamycin-induced hearing loss in mice.

    Science.gov (United States)

    Bächinger, David; Horvath, Lukas; Eckhard, Andreas; Goosmann, Madeline M; Honegger, Tim; Gassmann, Max; Vogel, Johannes; Naldi, Arianne Monge

    2018-07-01

    Aminoglycosides have detrimental effects on the hair cells of the inner ear, yet these agents indisputably are one of the cornerstones in antibiotic therapy. Hence, there is a demand for strategies to prevent aminoglycoside-induced ototoxicity, which are not available today. In vitro data suggests that the pleiotropic growth factor erythropoietin (EPO) is neuroprotective against aminoglycoside-induced hair cell loss. Here, we use a mouse model with EPO-overexpression in neuronal tissue to evaluate whether EPO could also in vivo protect from aminoglycoside-induced hearing loss. Auditory brainstem response (ABR) thresholds were measured in 12-weeks-old mice before and after treatment with kanamycin for 15 days, which resulted in both C57BL/6 and EPO-transgenic animals in a high-frequency hearing loss. However, ABR threshold shifts in EPO-transgenic mice were significantly lower than in C57BL/6 mice (mean difference in ABR threshold shift 13.6 dB at 32 kHz, 95% CI 3.8-23.4 dB, p = 0.003). Correspondingly, quantification of hair cells and spiral ganglion neurons by immunofluorescence revealed that EPO-transgenic mice had a significantly lower hair cell and spiral ganglion neuron loss than C57BL/6 mice. In conclusion, neuronal overexpression of EPO is protective against aminoglycoside-induce hearing loss, which is in accordance with its known neuroprotective effects in other organs, such as the eye or the brain. Copyright © 2018 Elsevier B.V. All rights reserved.

  14. Controversy Associated With the Common Component of Most Transgenic Plants – Kanamycin Resistance Marker Gene

    Directory of Open Access Journals (Sweden)

    Srećko Jelenić

    2003-01-01

    Full Text Available Plant genetic engineering is a powerful tool for producing crops resistant to pests, diseases and abiotic stress or crops with improved nutritional value or better quality products. Currently over 70 genetically modified (GM crops have been approved for use in different countries. These cover a wide range of plant species with significant number of different modified traits. However, beside the technology used for their improvement, the common component of most GM crops is the neomycin phosphotransferase II gene (nptII, which confers resistance to the antibiotics kanamycin and neomycin. The nptII gene is present in GM crops as a marker gene to select transformed plant cells during the first steps of the transformation process. The use of antibiotic-resistance genes is subject to controversy and intense debate, because of the likelihood that clinical therapy could be compromised due to inactivation of the oral dose of the antibiotic from consumption of food derived from the transgenic plant, and because of the risk of gene transfer from plants to gut and soil microorganisms or to consumer’s cells. The present article discusses these possibilities in the light of current scientific knowledge.

  15. A Novel Prokaryotic Green Fluorescent Protein Expression System for Testing Gene Editing Tools Activity Like Zinc Finger Nuclease.

    Science.gov (United States)

    Sabzehei, Faezeh; Kouhpayeh, Shirin; Dastjerdeh, Mansoureh Shahbazi; Khanahmad, Hossein; Salehi, Rasoul; Naderi, Shamsi; Taghizadeh, Razieh; Rabiei, Parisa; Hejazi, Zahra; Shariati, Laleh

    2017-01-01

    Gene editing technology has created a revolution in the field of genome editing. The three of the most famous tools in gene editing technology are zinc finger nucleases (ZFNs), transcription activator-like effector nucleases, clustered regularly interspaced short palindromic repeats (CRISPR), and CRISPR-associated systems. As their predictable nature, it is necessary to assess their efficiency. There are some methods for this purpose, but most of them are time labor and complicated. Here, we introduce a new prokaryotic reporter system, which makes it possible to evaluate the efficiency of gene editing tools faster, cheaper, and simpler than previous methods. At first, the target sites of a custom ZFN, which is designed against a segment of ampicillin resistance gene, were cloned on both sides of green fluorescent protein (GFP) gene to construct pPRO-GFP. Then pPRO-GFP was transformed into Escherichia coli TOP10F' that contains pZFN (contains expression cassette of a ZFN against ampicillin resistant gene), or p15A-KanaR as a negative control. The transformed bacteria were cultured on three separate media that contained ampicillin, kanamycin, and ampicillin + kanamycin; then the resulted colonies were assessed by flow cytometry. The results of flow cytometry showed a significant difference between the case (bacteria contain pZFN) and control (bacteria contain p15A, KanaR) in MFI (Mean Fluorescence Intensity) ( P < 0.0001). According to ZFN efficiency, it can bind and cut the target sites, the bilateral cutting can affect the intensity of GFP fluorescence. Our flow cytometry results showed that this ZFN could reduce the intensity of GFP color and colony count of bacteria in media containing amp + kana versus control sample.

  16. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    Science.gov (United States)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  17. Small test SDHW systems

    DEFF Research Database (Denmark)

    Vejen, Niels Kristian

    1999-01-01

    Three small test SDHW systems was tested in a laboratory test facility.The three SDHW systems where all based on the low flow principe and a mantle tank but the design of the systems where different.......Three small test SDHW systems was tested in a laboratory test facility.The three SDHW systems where all based on the low flow principe and a mantle tank but the design of the systems where different....

  18. Test System Impact on System Availability

    DEFF Research Database (Denmark)

    Pau, L. F.

    1987-01-01

    The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance of the sys......The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance...... of the system subject to monitoring and test. A time-dependent Markov model is presented, and applied in three cases, with examples of numerical results provided for preventive maintenance decisions, design of an automatic test system, buffer testing in computers, and data communications....

  19. Gene disruption in Salmonella typhimurim by modified λ Red disruption system.

    Science.gov (United States)

    Ahani Azari, A; Zahraei Salehi, T; Nayeri Fasaei, B; Alebouyeh, M

    2015-01-01

    There are many techniques to knock out directed genes in bacteria, some of which have been described in Salmonella species. In this study, a combination of SOEing PCR method and the λ Red disruption system were used to disrupt phoP gene in wild type and standard strains of Salmonella typhimurium. Three standards PCR and one fusion PCR reactions were performed to construct a linear DNA including upstream and downstream of phoP gene and Kanamycin cassette. As a template plasmid, we used pKD4 which carries kanamycin gene flanked by FRT (FLP recognition target) sites. The resulting construct was electroporated into prepared competent cells of S. typhimurium. The transformants colonies related to the standard strain appeared on the LB-Km-agar plates after incubation, but there was no colony on LB-Km-agar plates corresponding to the wild type strain. The failure in transformation of the wild type strain may be because of inflexibility of the λ Red disruption system in this strain or its unique restriction-modification system. However, by this construct we are able to generate phoP mutant in many of the Salmonella species due to high homology of the phoP gene which exists in different species.

  20. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  1. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  2. Evaluation of the BACTEC MGIT 960 SL DST Kit and the GenoType MTBDRsl Test for Detecting Extensively Drug-resistant Tuberculosis Cases.

    Science.gov (United States)

    Tekin, Kemal; Albay, Ali; Simsek, Hulya; Sig, Ali Korhan; Guney, Mustafa

    2017-10-01

    The present study aimed to evaluate the performances of the BACTEC MGIT 960 SL DST kit and the GenoType MTBDRsl test for detecting second-line antituberculosis drug resistance in Multidrug-resistant TB (MDR-TB) cases. Forty-six MDR-TB strains were studied. Second-line antituberculosis drug resistances were detected using the BACTEC MGIT 960 SL DST kit and the GenoType MTBDRsl test. The Middlebrook 7H10 agar proportion method was used as the reference test. The sensitivity and specificity values for the BACTEC MGIT 960 SL DST kit were both 100% for amikacin, kanamycin, capreomycin (4 µg/mL), and ofloxacin; 100% and 95.3%, respectively, for capreomycin (10 µg/mL); and 85.7% and 100%, respectively, for moxifloxacin (0.5 µg/mL). The sensitivity and specificity values for the GenoType MTBDRsl test to detect fluoroquinolone and aminoglycoside/cyclic peptide resistance were 88.9% and 100%, respectively, for ofloxacin and 85.7% and 94.9%, respectively, for moxifloxacin (0.5 µg/mL). The accuracy of the GenoType MTBDRsl assay for kanamycin, capreomycin, ofloxacin, and moxifloxacin was lower than that of the BACTEC MGIT 960 SL DST. The BACTEC MGIT 960 SL DST kit and the GenoType MTBDRsl were successful in detecting second-line antituberculosis drug resistance. Preliminary results of the GenoType MTBDRsl are very valuable for early treatment decisions, but we still recommend additional BACTEC MGIT 960 SL DST kit usage in the routine evaluation of drug-resistant tuberculosis.

  3. Evaluation of the BACTEC MGIT 960 SL DST Kit and the GenoType MTBDRsl Test for Detecting Extensively Drug-resistant Tuberculosis Cases

    Science.gov (United States)

    Tekin, Kemal; Albay, Ali; Simsek, Hulya; Sig, Ali Korhan; Guney, Mustafa

    2017-01-01

    Objective: The present study aimed to evaluate the performances of the BACTEC MGIT 960 SL DST kit and the GenoType MTBDRsl test for detecting second-line antituberculosis drug resistance in Multidrug-resistant TB (MDR-TB) cases. Materials and Methods: Forty-six MDR-TB strains were studied. Second-line antituberculosis drug resistances were detected using the BACTEC MGIT 960 SL DST kit and the GenoType MTBDRsl test. The Middlebrook 7H10 agar proportion method was used as the reference test. Results: The sensitivity and specificity values for the BACTEC MGIT 960 SL DST kit were both 100% for amikacin, kanamycin, capreomycin (4 µg/mL), and ofloxacin; 100% and 95.3%, respectively, for capreomycin (10 µg/mL); and 85.7% and 100%, respectively, for moxifloxacin (0.5 µg/mL). The sensitivity and specificity values for the GenoType MTBDRsl test to detect fluoroquinolone and aminoglycoside/cyclic peptide resistance were 88.9% and 100%, respectively, for ofloxacin and 85.7% and 94.9%, respectively, for moxifloxacin (0.5 µg/mL). The accuracy of the GenoType MTBDRsl assay for kanamycin, capreomycin, ofloxacin, and moxifloxacin was lower than that of the BACTEC MGIT 960 SL DST. Conclusion: The BACTEC MGIT 960 SL DST kit and the GenoType MTBDRsl were successful in detecting second-line antituberculosis drug resistance. Preliminary results of the GenoType MTBDRsl are very valuable for early treatment decisions, but we still recommend additional BACTEC MGIT 960 SL DST kit usage in the routine evaluation of drug-resistant tuberculosis. PMID:29123441

  4. Environmental and genetic factors affecting mutability to aminoglycoside antibiotics among Escherichia coli K12 strains

    Directory of Open Access Journals (Sweden)

    Monteiro A.C.M.

    2003-01-01

    Full Text Available Environmental and genetic factors affecting the in vitro spontaneous mutation frequencies to aminoglycoside resistance in Escherichia coli K12 were investigated. Spontaneous mutation frequencies to kanamycin resistance were at least 100 fold higher on modified Luria agar (L2 plates, when compared to results obtained in experiments carried out with Nutrient agar (NA plates. In contrast to rifampincin, the increased mutability to kanamycin resistance could not be attributed to a mutator phenotype expressed by DNA repair defective strains. Kanamycin mutant selection windows and mutant preventive concentrations on L2 plates were at least fourfold higher than on NA plates, further demonstrating the role of growth medium composition on the mutability to aminoglycosides. Mutability to kanamycin resistance was increased following addition of sorbitol, suggesting that osmolarity is involved on the spontaneous mutability of E. coli K12 strains to aminoglycosides. The spontaneous mutation rates to kanamycin resistance on both L2 and NA plates were strictly associated with the selective antibiotic concentrations. Moreover, mutants selected at different antibiotic concentrations expressed heterogeneous resistance levels to kanamycin and most of them expressing multiple resistance to all tested aminoglycoside antibiotics (gentamicin, neomycin, amykacin and tobramycin. These results will contribute to a better understanding of the complex nature of aminoglycoside resistance and the emergence of spontaneous resistant mutants among E. coli K12 strains.

  5. Error response test system and method using test mask variable

    Science.gov (United States)

    Gender, Thomas K. (Inventor)

    2006-01-01

    An error response test system and method with increased functionality and improved performance is provided. The error response test system provides the ability to inject errors into the application under test to test the error response of the application under test in an automated and efficient manner. The error response system injects errors into the application through a test mask variable. The test mask variable is added to the application under test. During normal operation, the test mask variable is set to allow the application under test to operate normally. During testing, the error response test system can change the test mask variable to introduce an error into the application under test. The error response system can then monitor the application under test to determine whether the application has the correct response to the error.

  6. UV irradiation as a tool for obtaining asymmetric somatic hybrids between Nicotiana plumbaginifolia and Lycopersicon esculentum

    International Nuclear Information System (INIS)

    Vlahova, M.; Hinnisdaels, S.; Frulleux, F.; Claeys, M.; Atanassov, A.; Jacobs, M.

    1997-01-01

    UV-irradiated kanamycin-resistant Lycopersicon esculentum leaf protoplasts were fused with wild-type Nicotiana plumbaginifolia leaf protoplasts. Hybrid calli were recovered after selection in kanamycin-containing medium and subsequently regenerated. Cytological analysis of these regenerants showed that several (2–4) tomato chromosomes, or chromosome fragments, were present in addition to a polyploid Nicotiana genome complement. All lines tested had neomycin phosphotransferase (NPTII) activity and the presence of the kanamycin gene was shown by Southern blotting. In two cases a different hybridization profile for the kanamycin gene, compared to the tomato donor partner, was observed, suggesting the occurence of intergenomic recombination events. The hybrid nature of the regenerants was further confirmed by Southernblotting experiments using either a ribosomal DNA sequence or a tomato-specific repeat as probes. The hybrids were partially fertile and some progeny could be obtained. Our results demonstrate that UV irradiation is a valuable alternative for asymmetric cell-hybridization experiments. (author)

  7. Kanamycin Sulphate Loaded PLGA-Vitamin-E-TPGS Long Circulating Nanoparticles Using Combined Coating of PEG and Water-Soluble Chitosan

    Directory of Open Access Journals (Sweden)

    Sanaul Mustafa

    2017-01-01

    Full Text Available Kanamycin sulphate (KS is a Mycobacterium tuberculosis protein synthesis inhibitor. Due to its intense hydrophilicity, KS is cleared from the body within 8 h. KS has a very short plasma half-life (2.5 h. KS is used in high concentrations to reach the therapeutic levels in plasma, which results in serious nephrotoxicity/ototoxicity. To overcome aforementioned limitations, the current study aimed to develop KS loaded PLGA-Vitamin-E-TPGS nanoparticles (KS-PLGA-TPGS NPs, to act as an efficient carrier for controlled delivery of KS. To achieve a substantial extension in blood circulation, a combined design, affixation of polyethylene glycol (PEG to KS-PLGA-TPGS NPs and adsorption of water-soluble chitosan (WSC (cationic deacetylated chitin to particle surface, was raised for surface modification of NPs. Surface modified NPs (KS-PEG-WSC NPs were prepared to provide controlled delivery and circulate in the bloodstream for an extended period of time, thus minimizing dosing frequency. In vivo pharmacokinetics and in vivo biodistribution following intramuscular administration were investigated. NPs surface charge was close to neutral +3.61 mV and significantly affected by the WSC coating. KS-PEG-WSC NPs presented striking prolongation in blood circulation, reduced protein binding, and long drew-out the blood circulation half-life with resultant reduced kidney sequestration vis-à-vis KS-PLGA-TPGS NPs. The studies, therefore, indicate the successful formulation development of KS-PEG-WSC NPs with reduced frequency of dosing of KS indicating low incidence of nephrotoxicity/ototoxicity.

  8. Data Link Test and Analysis System/ATCRBS Transponder Test System Technical Reference

    Science.gov (United States)

    1990-05-01

    This document references material for personnel using or making software changes : to the Data Link Test and Analysis System (DATAS) for Air Traffic Control Radar : Beacon System (ATCRBS) transponder testing and data collection. This is one of : a se...

  9. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  10. Portable Health Algorithms Test System

    Science.gov (United States)

    Melcher, Kevin J.; Wong, Edmond; Fulton, Christopher E.; Sowers, Thomas S.; Maul, William A.

    2010-01-01

    A document discusses the Portable Health Algorithms Test (PHALT) System, which has been designed as a means for evolving the maturity and credibility of algorithms developed to assess the health of aerospace systems. Comprising an integrated hardware-software environment, the PHALT system allows systems health management algorithms to be developed in a graphical programming environment, to be tested and refined using system simulation or test data playback, and to be evaluated in a real-time hardware-in-the-loop mode with a live test article. The integrated hardware and software development environment provides a seamless transition from algorithm development to real-time implementation. The portability of the hardware makes it quick and easy to transport between test facilities. This hard ware/software architecture is flexible enough to support a variety of diagnostic applications and test hardware, and the GUI-based rapid prototyping capability is sufficient to support development execution, and testing of custom diagnostic algorithms. The PHALT operating system supports execution of diagnostic algorithms under real-time constraints. PHALT can perform real-time capture and playback of test rig data with the ability to augment/ modify the data stream (e.g. inject simulated faults). It performs algorithm testing using a variety of data input sources, including real-time data acquisition, test data playback, and system simulations, and also provides system feedback to evaluate closed-loop diagnostic response and mitigation control.

  11. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. [Antibacterial prevention of suppurative complications after operations on the large intestine].

    Science.gov (United States)

    Kuzin, M I; Pomelov, V S; Vandiaev, G K; Ialgashev, T Ia; Blatun, L A

    1983-05-01

    The data on comparative study of complications after operations on the large intestine are presented. During the preoperative period, 62 patients of the control group were treated with phthalylsulfathiazole, nevigramon and nystatin. Thirty-nine patients of the test group were treated with metronidazole and kanamycin monosulfate. Kanamycin monosulfate was used 3 days before the operation in a dose of 0.5 g orally 4 times a day whereas metronidazole in a dose of 0.5 g 3 times a day. The last doses of the drugs were administered 4-5 hours before the operation. After the operations the patients were treated with kanamycin sulfate for 3-5 days in a daily dose of 2 g intramuscularly. The number of the postoperative suppurative complications decreased from 22 to 5 per cent. No lethal outcomes were registered in the test group. The number of lethal outcomes in the control group amounted to 8 per cent.

  13. Isolation of Specific Clones from Nonarrayed BAC Libraries through Homologous Recombination

    Directory of Open Access Journals (Sweden)

    Mikhail Nefedov

    2011-01-01

    Full Text Available We have developed a new approach to screen bacterial artificial chromosome (BAC libraries by recombination selection. To test this method, we constructed an orangutan BAC library using an E. coli strain (DY380 with temperature inducible homologous recombination (HR capability. We amplified one library segment, induced HR at 42∘C to make it recombination proficient, and prepared electrocompetent cells for transformation with a kanamycin cassette to target sequences in the orangutan genome through terminal recombineering homologies. Kanamycin-resistant colonies were tested for the presence of BACs containing the targeted genes by the use of a PCR-assay to confirm the presence of the kanamycin insertion. The results indicate that this is an effective approach for screening clones. The advantage of recombination screening is that it avoids the high costs associated with the preparation, screening, and archival storage of arrayed BAC libraries. In addition, the screening can be conceivably combined with genetic engineering to create knockout and reporter constructs for functional studies.

  14. Energy Systems High-Pressure Test Laboratory | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Energy Systems High-Pressure Test Laboratory Energy Systems High-Pressure Test Laboratory In the Energy Systems Integration Facility's High-Pressure Test Laboratory, researchers can safely test high-pressure hydrogen components. Photo of researchers running an experiment with a hydrogen fuel

  15. Evolution of a test article handling system for the SP-100 ground engineering system test

    International Nuclear Information System (INIS)

    Shen, E.J.; Schweiger, L.J.; Miller, W.C.; Gluck, R.; Devies, S.M.

    1987-04-01

    A simulated space environment test of a flight prototypic SP-100 reactor, control system, and flight shield will be conducted at the Hanford Engineering Development Laboratory (HEDL). The flight prototypic components and the supporting primary heat removal system are collectively known as the Nuclear Assembly Test Article (TA). The unique configuration and materials of fabrication for the Test Article require a specialized handling facility to support installation, maintenance, and final disposal operations. Westinghouse Hanford Company, the Test Site Operator, working in conjunction with General Electric Company, the Test Article supplier, developed and evaluated several handling concepts resulting in the selection of a reference Test Article Handling System. The development of the reference concept for the handling system is presented

  16. Space Fission System Test Effectiveness

    International Nuclear Information System (INIS)

    Houts, Mike; Schmidt, Glen L.; Van Dyke, Melissa; Godfroy, Tom; Martin, James; Bragg-Sitton, Shannon; Dickens, Ricky; Salvail, Pat; Harper, Roger

    2004-01-01

    Space fission technology has the potential to enable rapid access to any point in the solar system. If fission propulsion systems are to be developed to their full potential, however, near-term customers need to be identified and initial fission systems successfully developed, launched, and utilized. One key to successful utilization is to develop reactor designs that are highly testable. Testable reactor designs have a much higher probability of being successfully converted from paper concepts to working space hardware than do designs which are difficult or impossible to realistically test. ''Test Effectiveness'' is one measure of the ability to realistically test a space reactor system. The objective of this paper is to discuss test effectiveness as applied to the design, development, flight qualification, and acceptance testing of space fission systems. The ability to perform highly effective testing would be particularly important to the success of any near-term mission, such as NASA's Jupiter Icy Moons Orbiter, the first mission under study within NASA's Project Prometheus, the Nuclear Systems Program

  17. Test results of HTTR control system

    International Nuclear Information System (INIS)

    Motegi, Toshihiro; Iigaki, Kazuhiko; Saito, Kenji; Sawahata, Hiroaki; Hirato, Yoji; Kondo, Makoto; Shibutani, Hideki; Ogawa, Satoru; Shinozaki, Masayuki; Mizushima, Toshihiko; Kawasaki, Kozo

    2006-06-01

    The plant control performance of the IHX helium flow rate control system, the PPWC helium flow rate control system, the secondary helium flow rate control system, the inlet temperature control system, the reactor power control system and the outlet temperature control system of the HTTR are obtained through function tests and power-up tests. As the test results, the control systems show stable control response under transient condition. Both of inlet temperature control system and reactor power control system shows stable operation from 30% to 100%, respectively. This report describes the outline of control systems and test results. (author)

  18. [Construction and characterization of enterohemorrhagic Escherichia coli O157:H7 ppk- deleted strain].

    Science.gov (United States)

    Han, Peng; Sun, Qi; Zhao, Suhui; Zhang, Qiwei; Wan, Chengsong

    2014-06-01

    To construct enterohemorrhagic Escherichia coli (EHEC) O157: H7 ppk gene deletion strains and study its biological characteristics. The gene fragment of kanamycin resistance was amplified using a pair of homologous arm primers whose 5' and 3' ends were homologous with ppk gene and kanamycin resistance gene, respectively. EHEC O157: H7 EDL933w competent strains were prepared and transformed via electroporation with the amplification products. The ppk gene was replaced by kanamycin resistance gene using pKD46-mediated Red recombination system. The recombinant strain was confirmed by PCR and sequencing, and its morphology, growth ability and adhesion were assessed using Gram staining, OD600 value and Giemsa staining. We established a ppk-deleted EHEC O157:H7 EDL933w strain with kanamycin resistance and compared the biological characteristics of the wild-type and mutant strains, which may facilitate further study of the regulatory mechanism of ppk gene.

  19. Agar dilution method for susceptibility testing of Neisseria gonorrhoeae

    Directory of Open Access Journals (Sweden)

    Marta C de Castillo

    1996-12-01

    Full Text Available The antibiotic susceptibilities of Neisseria gonorrhoeae isolates obtained from patients attending a clinic for sexually transmitted diseases in Tucumán, Argentina, were determined by the agar dilution method (MIC. 3.5% of the isolates produced ²-lactamase. A total of 96.5% of ²-lactamase negative isolates tested were susceptible to penicillin (MIC < 2 µgml-1; 14.03% of the tested isolates were resistant to tetracycline (MIC < 2 µgml-1, and 98% of the tested isolates were susceptible to spectinomycin (MIC < 64 µgml-1. The MICs for 95% of the isolates, tested for other drugs were: < 2 µgml-1 for cefoxitin, < 0.06 µgml-1 for cefotaxime, < 0.25 µgml-1 for norfloxacin, < 10 µgml-1 for cephaloridine, < 10 µgml-1 for cephalexin, and < 50 µgml-1 for kanamycin. Antibiotic resistance among N. gonorrhoeae isolates from Tucumán, Argentina, appeared to be primarily limited to penicillin and tetracycline, which has been a general use against gonorrhoeae in Tucumán since 1960. Periodic monitoring of the underlying susceptibility profiles of the N. gonorrhoeae strains prevalent in areas of frequent transmission may provide clues regarding treatment options and emerging of drug resistance.

  20. Testing lifting systems in nuclear facilities

    International Nuclear Information System (INIS)

    Kling, H.; Laug, R.

    1984-01-01

    Lifting systems in nuclear facilities must be inspected at regular intervals after having undergone their first acceptance test. These inspections are frequently carried out by service firms which not only employ the skilled personnel required for such jobs but also make available the necessary test equipment. The inspections in particular include a number of sophisticated load tests for which test load systems have been developed to allow lifting systems to be tested so that reactor specific boundary conditions are taken into account. In view of the large number of facilities to be inspected, the test load system is a modular system. (orig.) [de

  1. Minicomputer controlled test system for process control and monitoring systems

    International Nuclear Information System (INIS)

    Worster, L.D.

    A minicomputer controlled test system for testing process control and monitoring systems is described. This system, in service for over one year, has demonstrated that computerized control of such testing has a real potential for expanding the scope of the testing, improving accuracy of testing, and significantly reducing the time required to do the testing. The test system is built around a 16-bit minicomputer with 12K of memory. The system programming language is BASIC with the addition of assembly level routines for communication with the peripheral devices. The peripheral devices include a 100 channel scanner, analog-to-digital converter, visual display, and strip printer. (auth)

  2. Fatigue tests of dowel-socket systems

    International Nuclear Information System (INIS)

    Chiang, D.D.

    1976-01-01

    A test program was conducted to determine the fatigue behavior of LHTGR fuel element dowel/socket systems. Two dowel/socket systems, namely, a four-dowel system and a five-dowel system, were tested to failure under shear loads applied through a fatigue test apparatus to simulate repetitive loading during a seismic event

  3. System Performance and Testing

    NARCIS (Netherlands)

    Frei, U.; Oversloot, H.

    2004-01-01

    This chapter compares and contrasts the system performance of two widely used solar thermal systems using testing and simulation programs. Solar thermal systems are used in many countries for heating domestically used water. In addition to the simple thermosiphon systems, better designed pumped

  4. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  5. Testing on air cleaning systems: Testing of the components in-place tests

    International Nuclear Information System (INIS)

    Billard, F.; Brion, J.

    1967-01-01

    The reliability of air cleaning systems is dependent on testing they are submitted to. Although in-place tests are the most important as they act as final tests upon achieved plants, component tests are necessary too. They allow detection of defective units before they are installed, partition of unit defects from mounting defects and they are more sensitive. For similar reasons, material teats are most useful. The various tests are described, about aerosol filters for one part, iodine trap for the other. The checked features are: materials nature, units sizes, efficiency, air resistance, flammability, humidity resistance, temperature resistance, adsorbent friability, etc... On iodine trapping systems, small check traps, working by-pass with the main trap are periodically subjected to efficiency test. This control allow to cut down the in-place tests frequency, particularly when poisoning from organic vapours is to be feared. (authors) [fr

  6. Safety testing for LHC access system

    CERN Document Server

    Valentini, F; Ninin, P; Scibile, S

    2008-01-01

    In the domain of Safety Real-Time Systems the problem of testing represents always a big effort in terms of time, costs and efficiency to guarantee an adequate coverage degree. Exhaustive tests may, in fact, not be practicable for large and distributed systems. This paper describes the testing process followed during the validation of the CERN's LHC Access System [1], responsible for monitoring and preventing physical risks for the personnel accessing the underground areas. In the paper we also present a novel strategy for the testing problem, intended to drastically reduce the time for the test patterns generation and execution. In particular, we propose a methodology for blackbox testing that relies on the application of Model Checking techniques. Model Checking is a formal method from computer science, commonly adopted to prove correctness of system’s models through an automatic system’s state space exploration against some property formulas.

  7. SP-100 nuclear assembly test: Test assembly functional requirements and system arrangement

    International Nuclear Information System (INIS)

    Fallas, T.T.; Gluck, R.; Motwani, K.; Clay, H.; O'Neill, G.

    1991-01-01

    This paper describes the functional requirements and the system that will be tested to validate the reactor, flight shield, and flight controller of the SP-100 Generic Flight System (GFS). The Nuclear Assembly Test (NAT) consists of the test article (SP-100 reactor with control devices and the flight shield) and its supporting systems. The NAT test assembly is being designed by GE. Westinghouse Hanford Company (WHC) is designing the test cell and vacuum vessel system that will contain the NAT test assembly (Renkey et al. 1989). Preliminary design reviews have been completed and the final design is under way

  8. CMIF ECLS system test findings

    Science.gov (United States)

    Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.

    1989-01-01

    During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

  9. High Power Alternator Test Unit (ATU) Electrical System Test

    Science.gov (United States)

    Birchenough, Arthur; Hervol, David

    2007-01-01

    The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, OH was used to simulate the operating conditions and evaluate the performance of the ATU and it s interaction with various LPSF components in accordance with the JIMO AC Power System Requirements. The testing was carried out at the breadboard development level. Results of these tests will be used for the development and validation of analytical models for performance and lifetime prediction.

  10. Test Telemetry And Command System (TTACS)

    Science.gov (United States)

    Fogel, Alvin J.

    1994-01-01

    The Jet Propulsion Laboratory has developed a multimission Test Telemetry and Command System (TTACS) which provides a multimission telemetry and command data system in a spacecraft test environment. TTACS reuses, in the spacecraft test environment, components of the same data system used for flight operations; no new software is developed for the spacecraft test environment. Additionally, the TTACS is transportable to any spacecraft test site, including the launch site. The TTACS is currently operational in the Galileo spacecraft testbed; it is also being provided to support the Cassini and Mars Surveyor Program projects. Minimal personnel data system training is required in the transition from pre-launch spacecraft test to post-launch flight operations since test personnel are already familiar with the data system's operation. Additionally, data system components, e.g. data display, can be reused to support spacecraft software development; and the same data system components will again be reused during the spacecraft integration and system test phases. TTACS usage also results in early availability of spacecraft data to data system development and, as a result, early data system development feedback to spacecraft system developers. The TTACS consists of a multimission spacecraft support equipment interface and components of the multimission telemetry and command software adapted for a specific project. The TTACS interfaces to the spacecraft, e.g., Command Data System (CDS), support equipment. The TTACS telemetry interface to the CDS support equipment performs serial (RS-422)-to-ethernet conversion at rates between 1 bps and 1 mbps, telemetry data blocking and header generation, guaranteed data transmission to the telemetry data system, and graphical downlink routing summary and control. The TTACS command interface to the CDS support equipment is nominally a command file transferred in non-real-time via ethernet. The CDS support equipment is responsible for

  11. Vitrification Facility integrated system performance testing report

    International Nuclear Information System (INIS)

    Elliott, D.

    1997-01-01

    This report provides a summary of component and system performance testing associated with the Vitrification Facility (VF) following construction turnover. The VF at the West Valley Demonstration Project (WVDP) was designed to convert stored radioactive waste into a stable glass form for eventual disposal in a federal repository. Following an initial Functional and Checkout Testing of Systems (FACTS) Program and subsequent conversion of test stand equipment into the final VF, a testing program was executed to demonstrate successful performance of the components, subsystems, and systems that make up the vitrification process. Systems were started up and brought on line as construction was completed, until integrated system operation could be demonstrated to produce borosilicate glass using nonradioactive waste simulant. Integrated system testing and operation culminated with a successful Operational Readiness Review (ORR) and Department of Energy (DOE) approval to initiate vitrification of high-level waste (HLW) on June 19, 1996. Performance and integrated operational test runs conducted during the test program provided a means for critical examination, observation, and evaluation of the vitrification system. Test data taken for each Test Instruction Procedure (TIP) was used to evaluate component performance against system design and acceptance criteria, while test observations were used to correct, modify, or improve system operation. This process was critical in establishing operating conditions for the entire vitrification process

  12. Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)

    International Nuclear Information System (INIS)

    1976-01-01

    The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development

  13. Continuous Improvement in Battery Testing at the NASA/JSC Energy System Test Area

    Science.gov (United States)

    Boyd, William; Cook, Joseph

    2003-01-01

    The Energy Systems Test Area (ESTA) at the Lyndon B. Johnson Space Center in Houston, Texas conducts development and qualification tests to fulfill Energy System Division responsibilities relevant to ASA programs and projects. EST A has historically called upon a variety of fluid, mechanical, electrical, environmental, and data system capabilities spread amongst five full-service facilities to test human and human supported spacecraft in the areas of propulsion systems, fluid systems, pyrotechnics, power generation, and power distribution and control systems. Improvements at ESTA are being made in full earnest of offering NASA project offices an option to choose a thorough test regime that is balanced with cost and schedule constraints. In order to continue testing of enabling power-related technologies utilized by the Energy System Division, an especially proactive effort has been made to increase the cost effectiveness and schedule responsiveness for battery testing. This paper describes the continuous improvement in battery testing at the Energy Systems Test Area being made through consolidation, streamlining, and standardization.

  14. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  15. Development of Final Running Test System for Digital Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang-Dae; Lee, Eui-Jong; Lim, Hee-Taek; Kim, Min-Seok [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    In nuclear industry, the newly designed systems to upgrade are qualified to meet IEEE standards and the regulatory guidelines for their functions, performance and reliability requirements. Failure Mode and Effect Analysis, Fault Tree Analysis, and Hazard Analysis have been used to improve the reliability of the control system. To ensure the completeness of the software, the verification and validation processes are carried out during the development process. In spite of the many efforts depending on the analysis and procedures, there are limitations to improve the reliability. The lessons learned from the currently installed system failures show the incompleteness of the final integration test. The current point-to-point and logic-to-logic separate test procedures manually performed by the engineers can cause some procedures missed and have effects on the critical functions. The design processes of the digital systems are met in accordance with the international standards and regulatory guidelines. The lessons learned from the failures of the running digital systems showed the limitations of the current verification and validation efforts. The various improvements and attempts have been considered including the expert review processes and the completeness of the test. In this paper, the Final Running Test Method evaluating the completeness of the digital system using the control patterns and the Test System Architecture are proposed.

  16. Development of Final Running Test System for Digital Systems

    International Nuclear Information System (INIS)

    Lee, Kwang-Dae; Lee, Eui-Jong; Lim, Hee-Taek; Kim, Min-Seok

    2016-01-01

    In nuclear industry, the newly designed systems to upgrade are qualified to meet IEEE standards and the regulatory guidelines for their functions, performance and reliability requirements. Failure Mode and Effect Analysis, Fault Tree Analysis, and Hazard Analysis have been used to improve the reliability of the control system. To ensure the completeness of the software, the verification and validation processes are carried out during the development process. In spite of the many efforts depending on the analysis and procedures, there are limitations to improve the reliability. The lessons learned from the currently installed system failures show the incompleteness of the final integration test. The current point-to-point and logic-to-logic separate test procedures manually performed by the engineers can cause some procedures missed and have effects on the critical functions. The design processes of the digital systems are met in accordance with the international standards and regulatory guidelines. The lessons learned from the failures of the running digital systems showed the limitations of the current verification and validation efforts. The various improvements and attempts have been considered including the expert review processes and the completeness of the test. In this paper, the Final Running Test Method evaluating the completeness of the digital system using the control patterns and the Test System Architecture are proposed

  17. A/T test system for production line; Seisan line yo A/T test system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-10

    This paper introduces an A/T test system for production line made by Meidensha, Inc. Rates and technology of mounting auto-transmissions (A/T) in recent automobiles are improving year after year. A/T production line testers were fabricated and supplied, including those for European countries. This system has the following features: the system employs low inertia AC motor, and is capable of performing tests in close conditions to actual cars; an insulated gate bipolar transistor (IGBT) inverter was employed to achieve control accuracy improvement and noise reduction; high-velocity transient measurement is possible by using a computer system based on the WindowsNT; a solenoid current slant control was employed to respond to electronically controlled A/T; and noise and vibration shift feeling instrumentation can also be used on option. Number of supply is four sets of front engine/front wheel drive (FF) car A/T testers for overseas countries, and two sets of FF A/T tests for use in Japan. (NEDO)

  18. 21 CFR 862.3610 - Methamphetamine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Methamphetamine test system. 862.3610 Section 862....3610 Methamphetamine test system. (a) Identification. A methamphetamine test system is a device intended to measure methamphetamine, a central nervous system stimulating drug, in serum, plasma, and urine...

  19. Launch Control System Software Development System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This system requires high quality testing that will measure and test the capabilities of the system. For the past two years, the Exploration and Operations Division at Kennedy Space Center (KSC) has assigned a group including interns and full-time engineers to develop automated tests to save the project time and money. The team worked on automating the testing process for the SCCS GUI that would use streamed simulated data from the testing servers to produce data, plots, statuses, etc. to the GUI. The software used to develop automated tests included an automated testing framework and an automation library. The automated testing framework has a tabular-style syntax, which means the functionality of a line of code must have the appropriate number of tabs for the line to function as intended. The header section contains either paths to custom resources or the names of libraries being used. The automation library contains functionality to automate anything that appears on a desired screen with the use of image recognition software to detect and control GUI components. The data section contains any data values strictly created for the current testing file. The body section holds the tests that are being run. The function section can include any number of functions that may be used by the current testing file or any other file that resources it. The resources and body section are required for all test files; the data and function sections can be left empty if the data values and functions being used are from a resourced library or another file. To help equip the automation team with better tools, the Project Lead of the Automated Testing Team, Jason Kapusta, assigned the task to install and train an optical character recognition (OCR

  20. Experimental fast reactor JOYO MK-III functional test. Primary auxiliary cooling system test

    International Nuclear Information System (INIS)

    Karube, Koji; Akagi, Shinji; Terano, Toshihiro; Onuki, Osamu; Ito, Hideaki; Aoki, Hiroshi; Odo, Toshihiro

    2004-03-01

    This paper describes the results of primary auxiliary cooling system, which were done as a part of JOYO MK-III function test. The aim of the tests was to confirm the operational performance of primary auxiliary EMP and the protection system including siphon breaker of primary auxiliary cooling system. The items of the tests were: (Test No.): (Test item). 1) SKS-117: EMP start up test. 2) SKS-118-1: EMP start up test when pony motor running. 3) SKS-121: Function test of siphon breaker. The results of the tests satisfied the required performance, and demonstrated successful operation of primary auxiliary cooling system. (author)

  1. BMFT-UPTF densitometer system test report

    International Nuclear Information System (INIS)

    Menkhaus, D.E.

    1985-11-01

    This report documents acceptance test results performed on the five Upper Plenum Test Facility (UPTF) three-beam densitometer systems and spare parts. The five densitometer systems are used on the UPTF four hot legs and broken cold leg to measure average chordal-beam densities. The primary objectives of the tests performed were: to verify all assemblies fit as designed (mechanical fitup); to ensure radiation levels met the criteria (<2.5 mR/h); to verify that design accuracy requirements were met (performance tests); and to verify proper operation of the densitometer systems (functional checks). 15 figs., 11 tabs

  2. System Testing of Desktop and Web Applications

    Science.gov (United States)

    Slack, James M.

    2011-01-01

    We want our students to experience system testing of both desktop and web applications, but the cost of professional system-testing tools is far too high. We evaluate several free tools and find that AutoIt makes an ideal educational system-testing tool. We show several examples of desktop and web testing with AutoIt, starting with simple…

  3. Test software for BESIII MDC electronics system

    International Nuclear Information System (INIS)

    Zhang Hongyu; Sheng Huayi; Zhu Haitao; Ji Xiaolu; Zhao Dongxu

    2006-01-01

    This paper presents the design of Test System Software for BESIII MDC Electronics. Two kinds of test systems, SBS VP7 based and PowerPC based systems, and their corresponding test software are introduced. The software is developed in LabVIEW 7.1 and Microsoft Visual C++ 6.0, some test functions of the software, as well as their user interfaces, are described in detail. The software has been applied in hardware debugging, performance test and long term stability test. (authors)

  4. Preoperational test report, primary ventilation system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-04

    This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  5. Preoperational test report, primary ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  6. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  7. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  8. Ship Systems Survivability Test Site

    Data.gov (United States)

    Federal Laboratory Consortium — Area for testing survivability of shipboard systems to include electrical, communications, and fire suppression. Multipurpose test range for supporting gun firing,...

  9. Internal testing of pipe systems with IRIS inspection system

    International Nuclear Information System (INIS)

    1986-01-01

    The internal piping inspection system IRIS allows inside testing of pipes with an internal diameter of NW 70 as a minimum, and of any horizontal or vertical layout of the piping system. Visual testing is done by means of an integrated CCD video system with high resolution power. Technical data are given and examples of applications, in the German and English language. (DG) [de

  10. Test results of six-month test of two water electrolysis systems

    Science.gov (United States)

    Mills, E. S.; Wells, G. W.

    1972-01-01

    The two water electrolysis systems used in the NASA space station simulation 90-day manned test of a regenerative life support system were refurbished as required and subjected to 26-weeks of testing. The two electrolysis units are both promising systems for oxygen and hydrogen generation and both needed extensive long-term testing to evaluate the performance of the respective cell design and provide guidance for further development. Testing was conducted to evaluate performance in terms of current, pressure, variable oxygen demands, and orbital simulation. An automatic monitoring system was used to record, monitor and printout performance data at one minute, ten minute or one-hour intervals. Performance data is presented for each day of system operation for each module used during the day. Failures are analyzed, remedial action taken to eliminate problems is discussed and recommendations for redesign for future space applications are stated.

  11. System design description for the whole element furnace testing system

    International Nuclear Information System (INIS)

    Ritter, G.A.; Marschman, S.C.; MacFarlan, P.J.; King, D.A.

    1998-05-01

    This document provides a detailed description of the Hanford Spent Nuclear Fuel (SNF) Whole Element Furnace Testing System located in the Postirradiation Testing Laboratory G-Cell (327 Building). Equipment specifications, system schematics, general operating modes, maintenance and calibration requirements, and other supporting information are provided in this document. This system was developed for performing cold vacuum drying and hot vacuum drying testing of whole N-Reactor fuel elements, which were sampled from the 105-K East and K West Basins. The proposed drying processes are intended to allow dry storage of the SNF for long periods of time. The furnace testing system is used to evaluate these processes by simulating drying sequences with a single fuel element and measuring key system parameters such as internal pressures, temperatures, moisture levels, and off-gas composition

  12. Excitation system testing in HPP 'Uvac'

    Directory of Open Access Journals (Sweden)

    Milojčić Nemanja

    2011-01-01

    Full Text Available The excitation system of hydro unit in HPP 'Uvac' and results of testings of excitation system performed for achieving of unit's mathematical model are presented in this paper. Description of excitation system equipment, parameters of regulators and results obtained after testings are presented. The presented results showed that the regulators are properly adjusted and that the excitation system is completely functional and reliable.

  13. The Systems Test Architect: Enabling The Leap From Testable To Tested

    Science.gov (United States)

    2016-09-01

    is and it would require some “fine-tuning.” [w] Mr. Peart finally has a physical architecture, and feels confident that it will meet the desired ...test and evaluation in systems engineering, this thesis examines the concept that test and evaluation, based on its desired early involvement in the...the documented roles of test and evaluation in systems engineering, this thesis examines the concept that test and evaluation, based on its desired

  14. DNA-Aptamers Binding Aminoglycoside Antibiotics

    Directory of Open Access Journals (Sweden)

    Nadia Nikolaus

    2014-02-01

    Full Text Available Aptamers are short, single stranded DNA or RNA oligonucleotides that are able to bind specifically and with high affinity to their non-nucleic acid target molecules. This binding reaction enables their application as biorecognition elements in biosensors and assays. As antibiotic residues pose a problem contributing to the emergence of antibiotic-resistant pathogens and thereby reducing the effectiveness of the drug to fight human infections, we selected aptamers targeted against the aminoglycoside antibiotic kanamycin A with the aim of constructing a robust and functional assay that can be used for water analysis. With this work we show that aptamers that were derived from a Capture-SELEX procedure targeting against kanamycin A also display binding to related aminoglycoside antibiotics. The binding patterns differ among all tested aptamers so that there are highly substance specific aptamers and more group specific aptamers binding to a different variety of aminoglycoside antibiotics. Also the region of the aminoglycoside antibiotics responsible for aptamer binding can be estimated. Affinities of the different aptamers for their target substance, kanamycin A, are measured with different approaches and are in the micromolar range. Finally, the proof of principle of an assay for detection of kanamycin A in a real water sample is given.

  15. 21 CFR 862.3660 - Phenobarbital test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Phenobarbital test system. 862.3660 Section 862....3660 Phenobarbital test system. (a) Identification. A phenobarbitol test system is a device intended to measure phenobarbital, an antiepileptic and sedative-hypnotic drug, in human specimens. Measurements...

  16. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  17. Programmable, automated transistor test system

    Science.gov (United States)

    Truong, L. V.; Sundburg, G. R.

    1986-01-01

    A programmable, automated transistor test system was built to supply experimental data on new and advanced power semiconductors. The data will be used for analytical models and by engineers in designing space and aircraft electric power systems. A pulsed power technique was used at low duty cycles in a nondestructive test to examine the dynamic switching characteristic curves of power transistors in the 500 to 1000 V, 10 to 100 A range. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software.

  18. Test-driven modeling of embedded systems

    DEFF Research Database (Denmark)

    Munck, Allan; Madsen, Jan

    2015-01-01

    To benefit maximally from model-based systems engineering (MBSE) trustworthy high quality models are required. From the software disciplines it is known that test-driven development (TDD) can significantly increase the quality of the products. Using a test-driven approach with MBSE may have...... a similar positive effect on the quality of the system models and the resulting products and may therefore be desirable. To define a test-driven model-based systems engineering (TD-MBSE) approach, we must define this approach for numerous sub disciplines such as modeling of requirements, use cases...... suggest that our method provides a sound foundation for rapid development of high quality system models....

  19. Wild-type MIC distributions for aminoglycoside and cyclic polypeptide antibiotics used for treatment of Mycobacterium tuberculosis infections.

    Science.gov (United States)

    Juréen, P; Angeby, K; Sturegård, E; Chryssanthou, E; Giske, C G; Werngren, J; Nordvall, M; Johansson, A; Kahlmeter, G; Hoffner, S; Schön, T

    2010-05-01

    The aminoglycosides and cyclic polypeptides are essential drugs in the treatment of multidrug-resistant tuberculosis, underscoring the need for accurate and reproducible drug susceptibility testing (DST). The epidemiological cutoff value (ECOFF) separating wild-type susceptible strains from non-wild-type strains is an important but rarely used tool for indicating susceptibility breakpoints against Mycobacterium tuberculosis. In this study, we established wild-type MIC distributions on Middlebrook 7H10 medium for amikacin, kanamycin, streptomycin, capreomycin, and viomycin using 90 consecutive clinical isolates and 21 resistant strains. Overall, the MIC variation between and within runs did not exceed +/-1 MIC dilution step, and validation of MIC values in Bactec 960 MGIT demonstrated good agreement. Tentative ECOFFs defining the wild type were established for all investigated drugs, including amikacin and viomycin, which currently lack susceptibility breakpoints for 7H10. Five out of seven amikacin- and kanamycin-resistant isolates were classified as susceptible to capreomycin according to the current critical concentration (10 mg/liter) but were non-wild type according to the ECOFF (4 mg/liter), suggesting that the critical concentration may be too high. All amikacin- and kanamycin-resistant isolates were clearly below the ECOFF for viomycin, and two of them were below the ECOFF for streptomycin, indicating that these two drugs may be considered for treatment of amikacin-resistant strains. Pharmacodynamic indices (peak serum concentration [Cmax]/MIC) were more favorable for amikacin and viomycin compared to kanamycin and capreomycin. In conclusion, our data emphasize the importance of establishing wild-type MIC distributions for improving the quality of drug susceptibility testing against Mycobacterium tuberculosis.

  20. Programmable automated transistor test system

    International Nuclear Information System (INIS)

    Truong, L.V.; Sundberg, G.R.

    1986-01-01

    The paper describes a programmable automated transistor test system (PATTS) and its utilization to evaluate bipolar transistors and Darlingtons, and such MOSFET and special types as can be accommodated with the PATTS base-drive. An application of a pulsed power technique at low duty cycles in a non-destructive test is used to examine the dynamic switching characteristic curves of power transistors. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software. In addition a library of test data is established on disks, tapes, and hard copies for future reference

  1. Availability of periodically tested systems

    International Nuclear Information System (INIS)

    Signoret, J.P.

    1979-01-01

    There is at the present time a need in accurate models to asess the availability of periodically tested stand-by systems. This paper shows how to improve the well known 'saw-tooth curve' model in order to take into account various reliability parameters. A model is developed to assess the pointwise and the mean availabilities of periodically tested stand-by systems. Exact and approxination formulae are given. In addition, the model developed herein leads to optimize the test interval in order to minimize the mean unavailability. A safety diesel in a nuclear power plant is given as an example

  2. 21 CFR 862.1225 - Creatinine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Creatinine test system. 862.1225 Section 862.1225....1225 Creatinine test system. (a) Identification. A creatinine test system is a device intended to measure creatinine levels in plasma and urine. Creatinine measurements are used in the diagnosis and...

  3. 21 CFR 862.3040 - Alcohol test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Alcohol test system. 862.3040 Section 862.3040 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED....3040 Alcohol test system. (a) Identification. An alcohol test system is a device intented to measure...

  4. 21 CFR 862.1035 - Albumin test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Albumin test system. 862.1035 Section 862.1035....1035 Albumin test system. (a) Identification. An albumin test system is a device intended to measure the albumin concentration in serum and plasma. Albumin measurements are used in the diagnosis and...

  5. Open Architecture Data System for NASA Langley Combined Loads Test System

    Science.gov (United States)

    Lightfoot, Michael C.; Ambur, Damodar R.

    1998-01-01

    The Combined Loads Test System (COLTS) is a new structures test complex that is being developed at NASA Langley Research Center (LaRC) to test large curved panels and cylindrical shell structures. These structural components are representative of aircraft fuselage sections of subsonic and supersonic transport aircraft and cryogenic tank structures of reusable launch vehicles. Test structures are subjected to combined loading conditions that simulate realistic flight load conditions. The facility consists of two pressure-box test machines and one combined loads test machine. Each test machine possesses a unique set of requirements or research data acquisition and real-time data display. Given the complex nature of the mechanical and thermal loads to be applied to the various research test articles, each data system has been designed with connectivity attributes that support both data acquisition and data management functions. This paper addresses the research driven data acquisition requirements for each test machine and demonstrates how an open architecture data system design not only meets those needs but provides robust data sharing between data systems including the various control systems which apply spectra of mechanical and thermal loading profiles.

  6. 21 CFR 862.1210 - Creatine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Creatine test system. 862.1210 Section 862.1210....1210 Creatine test system. (a) Identification. A creatine test system is a device intended to measure creatine (a substance synthesized in the liver and pancreas and found in biological fluids) in plasma...

  7. 21 CFR 862.1065 - Ammonia test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Ammonia test system. 862.1065 Section 862.1065....1065 Ammonia test system. (a) Identification. An ammonia test system is a device intended to measure ammonia levels in blood, serum, and plasma, Ammonia measurements are used in the diagnosis and treatment...

  8. 21 CFR 862.3600 - Mercury test system.

    Science.gov (United States)

    2010-04-01

    ....3600 Mercury test system. (a) Identification. A mercury test system is a device intended to measure mercury, a heavy metal, in human specimens. Measurements obtained by this device are used in the diagnosis... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Mercury test system. 862.3600 Section 862.3600...

  9. Space Launch System Scale Model Acoustic Test Ignition Overpressure Testing

    Science.gov (United States)

    Nance, Donald; Liever, Peter; Nielsen, Tanner

    2015-01-01

    The overpressure phenomenon is a transient fluid dynamic event occurring during rocket propulsion system ignition. This phenomenon results from fluid compression of the accelerating plume gas, subsequent rarefaction, and subsequent propagation from the exhaust trench and duct holes. The high-amplitude unsteady fluid-dynamic perturbations can adversely affect the vehicle and surrounding structure. Commonly known as ignition overpressure (IOP), this is an important design-to environment for the Space Launch System (SLS) that NASA is currently developing. Subscale testing is useful in validating and verifying the IOP environment. This was one of the objectives of the Scale Model Acoustic Test, conducted at Marshall Space Flight Center. The test data quantifies the effectiveness of the SLS IOP suppression system and improves the analytical models used to predict the SLS IOP environments. The reduction and analysis of the data gathered during the SMAT IOP test series requires identification and characterization of multiple dynamic events and scaling of the event waveforms to provide the most accurate comparisons to determine the effectiveness of the IOP suppression systems. The identification and characterization of the overpressure events, the waveform scaling, the computation of the IOP suppression system knockdown factors, and preliminary comparisons to the analytical models are discussed.

  10. Space Launch System Scale Model Acoustic Test Ignition Overpressure Testing

    Science.gov (United States)

    Nance, Donald K.; Liever, Peter A.

    2015-01-01

    The overpressure phenomenon is a transient fluid dynamic event occurring during rocket propulsion system ignition. This phenomenon results from fluid compression of the accelerating plume gas, subsequent rarefaction, and subsequent propagation from the exhaust trench and duct holes. The high-amplitude unsteady fluid-dynamic perturbations can adversely affect the vehicle and surrounding structure. Commonly known as ignition overpressure (IOP), this is an important design-to environment for the Space Launch System (SLS) that NASA is currently developing. Subscale testing is useful in validating and verifying the IOP environment. This was one of the objectives of the Scale Model Acoustic Test (SMAT), conducted at Marshall Space Flight Center (MSFC). The test data quantifies the effectiveness of the SLS IOP suppression system and improves the analytical models used to predict the SLS IOP environments. The reduction and analysis of the data gathered during the SMAT IOP test series requires identification and characterization of multiple dynamic events and scaling of the event waveforms to provide the most accurate comparisons to determine the effectiveness of the IOP suppression systems. The identification and characterization of the overpressure events, the waveform scaling, the computation of the IOP suppression system knockdown factors, and preliminary comparisons to the analytical models are discussed.

  11. 21 CFR 866.5040 - Albumin immunological test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Albumin immunological test system. 866.5040... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunological Test Systems § 866.5040 Albumin immunological test system. (a) Identification. An albumin immunological test system is a device that consists of...

  12. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  13. 21 CFR 862.3110 - Antimony test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Antimony test system. 862.3110 Section 862.3110 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES CLINICAL CHEMISTRY AND CLINICAL TOXICOLOGY DEVICES Clinical Toxicology Test Systems § 862.3110 Antimony test system. (a) Identification. A...

  14. A Physical Protection Systems Test Bed for International Counter-Trafficking System Development

    International Nuclear Information System (INIS)

    Stinson, Brad J.; Kuhn, Michael J.; Donaldson, Terrence L.; Richardson, Dave; Rowe, Nathan C.; Younkin, James R.; Pickett, Chris A.

    2011-01-01

    Physical protection systems have a widespread impact on the nuclear industry in areas such as nuclear safeguards, arms control, and trafficking of illicit goods (e.g., nuclear materials) across international borders around the world. Many challenges must be overcome in design and deployment of foreign border security systems such as lack of infrastructure, extreme environmental conditions, limited knowledge of terrain, insider threats, and occasional cultural resistance. Successful security systems, whether it be a system designed to secure a single facility or a whole border security system, rely on the entire integrated system composed of multiple subsystems. This test bed is composed of many unique sensors and subsystems, including wireless unattended ground sensors, a buried fiber-optic acoustic sensor, a lossy coaxial distributed sensor, wireless links, pan-tilt-zoom cameras, mobile power generation systems, unmanned aerial vehicles, and fiber-optic-fence intrusion detection systems. A Common Operating Picture software architecture is utilized to integrate a number of these subsystems. We are currently performance testing each system for border security and perimeter security applications by examining metrics such as probability of sense and a qualitative understanding of the sensors vulnerability of defeat. The testing process includes different soil conditions for buried sensors (e.g., dry, wet, and frozen) and an array of different tests including walking, running, stealth detection, and vehicle detection. Also, long term sustainability of systems is tested including performance differences due to seasonal variations (e.g. summer versus winter, while raining, in foggy conditions). The capabilities of the test bed are discussed. Performance testing results, both at the individual component level and integrated into a larger system for a specific deployment (in situ), help illustrate the usefulness and need for integrated testing facilities to carry out this

  15. Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  16. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  17. Waste retrieval sluicing system data acquisition system acceptance test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115

  18. Evolution of a test article handling system for the SP-100 GES test

    International Nuclear Information System (INIS)

    Shen, E.J.; Schweiger, L.J.; Miller, W.C.; Gluck, R.; Davies, S.M.

    1987-01-01

    A simulated space environment test of a flight prototypic SP-100 reactor, control system, and flight shield will be conducted at the Hanford Engineering Development Laboratory (HEDL). The flight prototypic components and the supporting primary heat removal system are collectively known as the nuclear assembly test article (TA). The unique configuration and materials of fabrication for the Test Article require a specialized handling facility to support installation, maintenance, and final disposal operation. The test site operator, working in conjunction with the test article supplier, developed and evaluated several handling concepts resulting in the selection of a reference test article handling system. The development of the reference concept for the handling system is presented

  19. Lightning vulnerability of nuclear explosive test systems at the Nevada Test Site

    International Nuclear Information System (INIS)

    Hasbrouck, R.T.

    1985-01-01

    A task force chartered to evaluate the effects of lightning on nuclear explosives at the Nevada Test Site has made several recommendations intended to provide lightning-invulnerable test device systems. When these recommendations have been implemented, the systems will be tested using full-threat-level simulated lightning

  20. Cooperative Testing of Uncontrollable Timed Systems

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Li, Shuhao

    2008-01-01

    the SUT against the test purpose as long as the SUT reacts to our moves in a cooperative style. We present an operational framework of cooperative winning strategy generation, test case derivation and execution. The test method is proved to be sound and complete. Preliminary experimental results indicate......Abstract. This paper deals with targeted testing of timed systems with uncontrollable behavior. The testing activity is viewed as a game between the tester and the system under test (SUT) towards a given test purpose. The SUT is modeled as Timed Game Automaton and the test purpose is specified...... in Timed CTL formula. We can employ a timed game solver UPPAAL-TIGA to check if the test purpose is ture w.r.t. the model, and if yes, to generate a winning strategy and use it for black-box conformance testing. Specifically, we show that in case the checking yields a negative result, we can still test...

  1. Water electrolysis system refurbishment and testing

    Science.gov (United States)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  2. An introduction to testing techniques in the Intelsat TDMA/DSI system. II - Satellite system operations guide (SSOG) tests

    Science.gov (United States)

    Colby, R. J.; Parthasarathy, R.; Stimson, A. L.

    1983-12-01

    The test methods and procedures of the Intelsat TDMA/DSI SSOG are summarized. The overall structure of the SSOG is outlined, and the operational procedures to be followed for joining a new terminal to the system and for normal operations are reviewed, with an emphasis on the roles of the IOC and the TDMA reference and monitoring stations. The testing philosophy (based on minimal interruptions) and the star-test method are explained and illustrated with diagrams, and the test procedures are examined, including modem tests, electrical-path-length equalization, RF/IF downchain tests, protocol tests, nontransmitting protocol tests, IF/RF upchain tests, transmitting protocol tests, baseband tests, and orderwire lineups. The fundamental access discipline of the TDMA system is presented in an appendix.

  3. PFN tool test and calibration system

    International Nuclear Information System (INIS)

    Stephenson, W.A.

    1981-12-01

    A system has been developed for the functional testing and neutron output calibration of the PFN (Prompt Fission Neutron) Uranium Logging Tool. The system was designed primarily for field work and consists of a special vehicle as well as test apparatus. Only the pertinent instrumentation is described. This document will serve as an Instruction and Test Equipment service manual for those involved with calibration of the neutron output of the PFN tool

  4. Automated System Tests High-Power MOSFET's

    Science.gov (United States)

    Huston, Steven W.; Wendt, Isabel O.

    1994-01-01

    Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.

  5. Test Confessions : A Study of Testing Practices for Plug-in Systems

    NARCIS (Netherlands)

    Greiler, M.; Van Deursen, A.; Storey, M.A.

    2011-01-01

    Testing plug-in-based systems is challenging due to complex interactions among many different plug-ins, and variations in version and configuration. The objective of this paper is to increase our understanding of what testers and developers think and do when it comes to testing plug-inbased systems.

  6. Orion Ammonia Boiler System Preflight Test Preparations

    Science.gov (United States)

    Levitt, Julia L.

    2017-01-01

    The Environmental Controls and Life Support Systems (ECLSS) branch at Kennedy Space Center (KSC) is currently undergoing preparations for ground testing of the Orion Multi-Purpose Crew Vehicle (MPCV) to prepare its subsystems for EM-1 (Exploration Mission-1). EM-1, Orions second unmanned flight, is a three-week long lunar mission during which the vehicle will complete a 6-day retrograde lunar orbit before returning to Earth. This paper focuses on the work done during the authors 16-week internship with the Mechanical Engineering Branch of KSCs Engineering Directorate. The authors project involved assisting with the preparations for testing the Orion MPCVs ammonia boiler system. The purpose of the ammonia boiler system is to keep the spacecraft sufficiently cool during the reentry portion of its mission, from service module (SM) separation to post-landing. This system is critical for keeping both the spacecraft (avionics and electronics) and crew alive during reentry, thus a successful test of the system is essential to the success of EM-1. XXXX The author was able to draft a detailed outline of the procedure for the ammonia system functional test. More work will need to be done on the vehicle power-up and power-down portions of the procedure, but the ammonia system testing portion of the procedure is thorough and includes vehicle test configurations, vehicle commands, and GSE. The author was able to compile a substantial list of questions regarding the ammonia system functional test with the help of her mentors. A significant number of these questions were answered in the teleconferences with Lockheed Martin.

  7. Testing of nuclear air-cleaning systems

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    A standard is presented which describes methods for field-testing nuclear power plant air cleaning systems. Included are specifications for visual inspection; duct and housing leak test; mounting frame pressure leak test; airflow capacity, distribution, and residence time tests; air-aerosol mixing uniformity test; in place leak test of HEPA filter banks; multiple sampling technique; in-place leak test of adsorber stage; laboratory testing of adsorbent; and duct heater performance test

  8. Test and control computer user's guide for a digital beam former test system

    Science.gov (United States)

    Alexovich, Robert E.; Mallasch, Paul G.

    1992-01-01

    A Digital Beam Former Test System was developed to determine the effects of noise, interferers and distortions, and digital implementations of beam forming as applied to the Tracking and Data Relay Satellite 2 (TDRS 2) architectures. The investigation of digital beam forming with application to TDRS 2 architectures, as described in TDRS 2 advanced concept design studies, was conducted by the NASA/Lewis Research Center for NASA/Goddard Space Flight Center. A Test and Control Computer (TCC) was used as the main controlling element of the digital Beam Former Test System. The Test and Control Computer User's Guide for a Digital Beam Former Test System provides an organized description of the Digital Beam Former Test System commands. It is written for users who wish to conduct tests of the Digital Beam forming Test processor using the TCC. The document describes the function, use, and syntax of the TCC commands available to the user while summarizing and demonstrating the use of the commands wtihin DOS batch files.

  9. Preoperational test report, recirculation ventilation systems

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-11

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  10. Preoperational test report, recirculation ventilation systems

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  11. 21 CFR 862.1710 - Total triiodothyronine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Total triiodothyronine test system. 862.1710... Systems § 862.1710 Total triiodothyronine test system. (a) Identification. A total triiodothyronine test system is a device intended to measure the hormone triiodothyronine in serum and plasma. Measurements...

  12. Spaceport Command and Control System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  13. Spaceport Command and Control System Automated Testing

    Science.gov (United States)

    Stein, Meriel

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  14. Automatic test system of the photomultipliers

    International Nuclear Information System (INIS)

    Shiino, Kazuo; Kono, Koji; Ishii, Takanobu; Kasai, Seiji; Yamada, Sakue; Kitamura, Shoichi.

    1990-03-01

    A test system of R580 photomultipliers (PMTs) was constructed for the ZEUS experiment HERA. In this report, we will describe the general feature of the test system, each component of the setup, the procedure of the measurements, the data analyses and the results of the first 800 PMT measurements. (author)

  15. Performance test results of mock-up test facility of HTTR hydrogen production system

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo

    2004-01-01

    For the purpose to demonstrate effectiveness of high-temperature nuclear heat utilization, Japan Atomic Energy Research Institute has been developing a hydrogen production system and has planned to connect the hydrogen production system to High Temperature Engineering Test Reactor (HTTR). Prior to construction of a HTTR hydrogen production system, a mock-up test facility was constructed to investigate transient behavior of the hydrogen production system and to establish system controllability. The Mock-up test facility with a full-scale reaction tube is an approximately 1/30-scale model of the HTTR hydrogen production system and an electric heater is used as a heat source instead of a reactor. After its construction, a performance test of the test facility was carried out in the same pressure and temperature conditions as those of the HTTR hydrogen production system to investigate its performance such as hydrogen production ability, controllability and so on. It was confirmed that hydrogen was stably produced with a hot helium gas about 120m 3 /h, which satisfy the design value, and thermal disturbance of helium gas during the start-up could be mitigated within the design value by using a steam generator. The mock-up test of the HTTR hydrogen production system using this facility will continue until 2004. (author)

  16. Testing cooperative systems with the MARS simulator

    NARCIS (Netherlands)

    Netten, B.D.; Wedemeijer, H.

    2010-01-01

    The complexity of cooperative systems makes the use of high fidelity simulation essential in the development and testing of cooperative applications and their interactions with other cooperative systems. In SAFESPOT a simulator test bench is setup to test the safety margin applications running on

  17. ELECTROFORCE 3330 TEST SYSTEM

    Data.gov (United States)

    Federal Laboratory Consortium — The Bose Electroforce 3330 is a test system with an axial electromagnetic linear motor, a torsional motor, and an environmental chamber for high and low temperature...

  18. Model-based testing for embedded systems

    CERN Document Server

    Zander, Justyna; Mosterman, Pieter J

    2011-01-01

    What the experts have to say about Model-Based Testing for Embedded Systems: "This book is exactly what is needed at the exact right time in this fast-growing area. From its beginnings over 10 years ago of deriving tests from UML statecharts, model-based testing has matured into a topic with both breadth and depth. Testing embedded systems is a natural application of MBT, and this book hits the nail exactly on the head. Numerous topics are presented clearly, thoroughly, and concisely in this cutting-edge book. The authors are world-class leading experts in this area and teach us well-used

  19. 21 CFR 862.1670 - Sorbitol dehydrogenase test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Sorbitol dehydrogenase test system. 862.1670... Systems § 862.1670 Sorbitol dehydrogenase test system. (a) Identification. A sorbitol dehydrogenase test system is a device intended to measure the activity of the enzyme sorbitol dehydrogenase in serum...

  20. 21 CFR 862.1630 - Protein (fractionation) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Protein (fractionation) test system. 862.1630... Systems § 862.1630 Protein (fractionation) test system. (a) Identification. A protein (fractionation) test system is a device intended to measure protein fractions in blood, urine, cerebrospinal fluid, and other...

  1. Model-Driven Test Generation of Distributed Systems

    Science.gov (United States)

    Easwaran, Arvind; Hall, Brendan; Schweiker, Kevin

    2012-01-01

    This report describes a novel test generation technique for distributed systems. Utilizing formal models and formal verification tools, spe cifically the Symbolic Analysis Laboratory (SAL) tool-suite from SRI, we present techniques to generate concurrent test vectors for distrib uted systems. These are initially explored within an informal test validation context and later extended to achieve full MC/DC coverage of the TTEthernet protocol operating within a system-centric context.

  2. Construction of test-bed system of voltage management system to ...

    African Journals Online (AJOL)

    Construction of test-bed system of voltage management system to apply physical power system. ... Journal of Fundamental and Applied Sciences ... system of voltage management system (VMS) in order to apply physical power system.

  3. Preoperational test report, raw water system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-10-29

    This represents the preoperational test report for the Raw Water System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system supplies makeup water to the W-030 recirculation evaporative cooling towers for tanks AY1O1, AY102, AZ1O1, AZ102. The Raw Water pipe riser and associated strainer and valving is located in the W-030 diesel generator building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  4. Preoperational test report, raw water system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents the preoperational test report for the Raw Water System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system supplies makeup water to the W-030 recirculation evaporative cooling towers for tanks AY1O1, AY102, AZ1O1, AZ102. The Raw Water pipe riser and associated strainer and valving is located in the W-030 diesel generator building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  5. PREVALENCE OF ANTIBIOTIC RESISTANT STRAINS OF ESCHERICHIA COLI AND ENTEROCOCCUS SPP. IN ROE DEER (CAPREOLUS CAPREOLUS AND RED DEER (CERVUS ELAPHUS AT THE PARCO NAZIONALE DEI MONTI SIBILLINI, ITALY

    Directory of Open Access Journals (Sweden)

    I. Pisano

    2009-09-01

    Full Text Available A case control study was performed in the Parco Nazionale dei Monti Sibillini, Italy, to find out whether roe deer (Capreolus capreolus and red deer (Cervus elaphus were more likely to harbour antibiotic resistant Escherichia coli in their faeces, compared to Enterococcus spp. Ten areas were selected and samples were collected during a fourmonths (May to August, 2008 sampling period. Samples of water (n=12 and feces (n=59, collected at 10 different sites, were cultured for E. coli and Enterococcus spp. The resulting colonies were screened for tetracycline, ampicillin and kanamycin resistance using the Lederberg Replica Plating method (breakpoint 4 μg/ml. All resistant isolates were then selected, and subjected to the CLSI antimicrobial plate susceptibility test (7. Among the water specimens contaminated by E. coli, 80% were found to be resistant to ampicillin, 80% to tetracycline and 40% to kanamycin. Among the water specimens contaminated by Enterococcus spp., 14.29% were found to be resistant to ampicillin, 14.29% to tetracycline and 71.3% to kanamycin. Among the 39 strains of E. coli isolated from red deer feces, 12 were resistant to ampicillin (30.77%, 5 to tetracycline (12,82% and 3 to kanamycin (7.69%. Among the 19 strains of Enterococcus spp. isolated from red deer feces, 0 were resistant to ampicillin (0%, 1 to tetracycline (5.26% and 19 to kanamycin (100. These are significant findings, indicating that antibiotic resistance can be found in naïve animal populations and that red deer and fallow deer could act as sentinels for antimicrobial resistance. Key words Antibiotic-resistance, red deer, fallow deer, Escherichia

  6. The Transrapid test facility between system development and system application

    Energy Technology Data Exchange (ETDEWEB)

    Baur, L [MVP GmbH, Muenchen (Germany)

    1996-12-31

    In the development of a new rail technology, such as the magnetic levitation, there is - in contrast to the further development of the railway technology - not the possibility to use existing routes for the technical verification of the system technology until the application. Instead of this there are two possibilities: Cost-effective preliminary development on test beds and small test facilities up to a development stage which justifies the (relatively serious) risk of realising a service route early and to conclude the system trials and verification there; cost-intensive construction of a large-scale test facility which permits an application-related verification of all important system functions and thus creates the technical pre-requisites for a low-risk system application; The presentation deals with the technical requirements of the system at the test facility the challenges and chances linked to its realisation and adjustment to the rapidly progressing state-of-the-art and which this way opens up for a minimisation of the technical application risk. (orig./HW)

  7. Cyber-Physical Energy Systems Modeling, Test Specification, and Co-Simulation Based Testing

    DEFF Research Database (Denmark)

    van der Meer, A. A.; Palensky, P.; Heussen, Kai

    2017-01-01

    The gradual deployment of intelligent and coordinated devices in the electrical power system needs careful investigation of the interactions between the various domains involved. Especially due to the coupling between ICT and power systems a holistic approach for testing and validating is required....... Taking existing (quasi-) standardised smart grid system and test specification methods as a starting point, we are developing a holistic testing and validation approach that allows a very flexible way of assessing the system level aspects by various types of experiments (including virtual, real......, and mixed lab settings). This paper describes the formal holistic test case specification method and applies it to a particular co-simulation experimental setup. The various building blocks of such a simulation (i.e., FMI, mosaik, domain-specific simulation federates) are covered in more detail...

  8. Virtualization of System of Systems Test and Evaluation

    Science.gov (United States)

    2012-06-04

    computers and is the primary enabler for virtualization. 2. Virtualization System Elements Parmalee, Peterson , Tillman, & Hatfield (1972) outlined the...The work of Abu-Taieh and El Sheikh, based on the work of Balci (1994, 1995), and Balci et al. ( 1996 ), seeks to organize types of tests and to...and testing. In A. Dasso & A. Funes (Eds.), Verification, validation, and testing in software engineering (pp. 155–184). Hershey , PA: Idea Group

  9. Sims Prototype System 2 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The testing, problems encountered, and the results and conclusions obtained from tests performed on the IBM Prototype System, 2, solar hot water system, at the Marshall Space Flight Center Solar Test Facility was described. System 2 is a liquid, non draining solar energy system for supplying domestic hot water to single residences. The system consists of collectors, storage tank, heat exchanger, pumps and associated plumbing and controls.

  10. Specification and Test of Real-Time Systems

    DEFF Research Database (Denmark)

    Nielsen, Brian

    of the system, and a set of constraint patterns which describes and enforces the timing and synchronization constraints among components. We propose new techniques for automated black box conformance testing of real-time systems against densely timed speci cations. A test generator tool examines a specification......Distributed real-time computer based systems are very complex and intrinsically difficult to specify and implement correctly; in part this is caused by the overwhelming number of possible interactions between system components, but especially by a lack of adequate methods and tools to deal...... of the desired system behavior and generates the necessary test cases. A main problem is to construct a reasonably small test suite that can be executed within allotted resources, while having a high likelihood of detecting unknown errors. Our goal has been to treat the time dimension of this problem thoroughly...

  11. Scar formation in mice deafened with kanamycin and furosemide

    NARCIS (Netherlands)

    Zak, Magdalena; van der Linden, Cynthia A; Bezdjian, Aren; Hendriksen, Ferry G; Klis, Sjaak F L; Grolman, Wilko

    In mammals, hair cell loss is irreversible and leads to hearing loss. To develop and test the functioning of different strategies aiming at hair cell regeneration, animal models of sensorineural hearing loss are essential. Although cochleae of these animals should lack hair cells, supporting cells

  12. A listening test system for automative audio

    DEFF Research Database (Denmark)

    Bech, Søren; Gulbol, Mehmet-Ali; Martin, Geoff

    2005-01-01

    This paper describes two listening tests that were performed to provide initial validation of an auralisation system (see Part 1) to mimic the acoustics of a car interior. The validation is based on a comparison of results from an in-car listening test and another test using the auralisation system...... and recordings of the stimuli used for the in-car test. The music samples for the test were chosen from a database of various CODEC examples from a previous extensive ITU test to validate the ITU-R BS.1387-1 standard....

  13. Test procedure for boxed waste assay system

    International Nuclear Information System (INIS)

    Wachter, J.

    1994-01-01

    This document, prepared by Los Alamos National Laboratory's NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system's embedded operating and data reduction software

  14. System maintenance test plan for the TWRS controlled baseline database system

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented

  15. Wild-Type MIC Distributions for Aminoglycoside and Cyclic Polypeptide Antibiotics Used for Treatment of Mycobacterium tuberculosis Infections▿

    Science.gov (United States)

    Juréen, P.; Ängeby, K.; Sturegård, E.; Chryssanthou, E.; Giske, C. G.; Werngren, J.; Nordvall, M.; Johansson, A.; Kahlmeter, G.; Hoffner, S.; Schön, T.

    2010-01-01

    The aminoglycosides and cyclic polypeptides are essential drugs in the treatment of multidrug-resistant tuberculosis, underscoring the need for accurate and reproducible drug susceptibility testing (DST). The epidemiological cutoff value (ECOFF) separating wild-type susceptible strains from non-wild-type strains is an important but rarely used tool for indicating susceptibility breakpoints against Mycobacterium tuberculosis. In this study, we established wild-type MIC distributions on Middlebrook 7H10 medium for amikacin, kanamycin, streptomycin, capreomycin, and viomycin using 90 consecutive clinical isolates and 21 resistant strains. Overall, the MIC variation between and within runs did not exceed ±1 MIC dilution step, and validation of MIC values in Bactec 960 MGIT demonstrated good agreement. Tentative ECOFFs defining the wild type were established for all investigated drugs, including amikacin and viomycin, which currently lack susceptibility breakpoints for 7H10. Five out of seven amikacin- and kanamycin-resistant isolates were classified as susceptible to capreomycin according to the current critical concentration (10 mg/liter) but were non-wild type according to the ECOFF (4 mg/liter), suggesting that the critical concentration may be too high. All amikacin- and kanamycin-resistant isolates were clearly below the ECOFF for viomycin, and two of them were below the ECOFF for streptomycin, indicating that these two drugs may be considered for treatment of amikacin-resistant strains. Pharmacodynamic indices (peak serum concentration [Cmax]/MIC) were more favorable for amikacin and viomycin compared to kanamycin and capreomycin. In conclusion, our data emphasize the importance of establishing wild-type MIC distributions for improving the quality of drug susceptibility testing against Mycobacterium tuberculosis. PMID:20237102

  16. Multiloop integral system test (MIST)

    International Nuclear Information System (INIS)

    Gloudemans, J.R.

    1989-07-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock and Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The individual tests are described in detail in Volumes 2 through 8 and Volume 11, and are summarized in Volume 1. Inter-group comparisons are addressed in this document, Volume 9. These comparisons are grouped as follows: mapping versus SBLOCA transients, SBLOCA, pump effects, and the effects of noncondensible gases. Appendix A provides an index and description of the microfiched plots for each test, which are enclosed with the corresponding Volumes 2 through 8. 147 figs., 5 tabs

  17. 40 CFR 792.43 - Test system care facilities.

    Science.gov (United States)

    2010-07-01

    .... (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as... different tests. (b) A testing facility shall have a number of animal rooms or other test system areas... waste and refuse or for safe sanitary storage of waste before removal from the testing facility...

  18. Preoperational test report, vent building ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  19. Orion Boiler Plate Airdrop Test System

    Science.gov (United States)

    Machin, Ricardo A.; Evans, Carol T.

    2013-01-01

    On the 29th of February 2012 the Orion Capsule Parachute Assembly System (CPAS) project attempted to perform an airdrop test of a boilerplate test article for the second time. The first attempt (Cluster Development Test 2, July 2008) to deliver a similar boilerplate from a C-17 using the Low Velocity Air Drop (LVAD) technique resulted in the programmer parachute failing to properly inflate, the test article failing to achieve the desired test initiation conditions, and the test article a total loss. This paper will pick up where the CDT-2 failure investigation left off, describing the test technique that was adopted, and outline the modeling that was performed to gain confidence that the second attempt would be successful. The second boiler plate test (Cluster Development Test 3-3) was indeed a complete success and has subsequently been repeated several times, allowing the CPAS project to proceed with the full scale system level development testing required to integrate the hardware to the first Entry Flight Test vehicle as well as go into the Critical Design Review with minimum risk and a mature design.

  20. Tritium system test assembly control system cost estimate

    International Nuclear Information System (INIS)

    Stutz, R.A.

    1979-01-01

    The principal objectives of the Tritium Systems Test Assembly (TSTA), which includes the development, demonstration and interfacing of technologies related to the deuterium--tritium fuel cycle for fusion reactor systems, are concisely stated. The various integrated subsystems comprising TSTA and their functions are discussed. Each of the four major subdivisions of TSTA, including the main process system, the environmental and safety systems, supporting systems and the physical plant are briefly discussed. An overview of the Master Data Acquisition and Control System, which will control all functional operation of TSTA, is provided

  1. A prototype tap test imaging system: Initial field test results

    Science.gov (United States)

    Peters, J. J.; Barnard, D. J.; Hudelson, N. A.; Simpson, T. S.; Hsu, D. K.

    2000-05-01

    This paper describes a simple, field-worthy tap test imaging system that gives quantitative information about the size, shape, and severity of defects and damages. The system consists of an accelerometer, electronic circuits for conditioning the signal and measuring the impact duration, a laptop PC and data acquisition and processing software. The images are generated manually by tapping on a grid printed on a plastic sheet laid over the part's surface. A mechanized scanner is currently under development. The prototype has produced images for a variety of aircraft composite and metal honeycomb structures containing flaws, damages, and repairs. Images of the local contact stiffness, deduced from the impact duration using a spring model, revealed quantitatively the stiffness reduction due to flaws and damages, as well as the stiffness enhancement due to substructures. The system has been field tested on commercial and military aircraft as well as rotor blades and engine decks on helicopters. Field test results will be shown and the operation of the system will be demonstrated.—This material is based upon work supported by the Federal Aviation Administration under Contract #DTFA03-98-D-00008, Delivery Order No. IA016 and performed at Iowa State University's Center for NDE as part of the Center for Aviation Systems Reliability program.

  2. Tutoring system for nondestructive testing using computer

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jin Koo; Koh, Sung Nam [Joong Ang Inspection Co.,Ltd., Seoul (Korea, Republic of); Shim, Yun Ju; Kim, Min Koo [Dept. of Computer Engineering, Aju University, Suwon (Korea, Republic of)

    1997-10-15

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing.

  3. Tutoring system for nondestructive testing using computer

    International Nuclear Information System (INIS)

    Kim, Jin Koo; Koh, Sung Nam; Shim, Yun Ju; Kim, Min Koo

    1997-01-01

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing.

  4. 21 CFR 862.1715 - Triiodothyronine uptake test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Triiodothyronine uptake test system. 862.1715... Systems § 862.1715 Triiodothyronine uptake test system. (a) Identification. A triiodothyronine uptake test... plasma. Measurements of triiodothyronine uptake are used in the diagnosis and treatment of thyroid...

  5. Transformation of pecan and regeneration of transgenic plants.

    Science.gov (United States)

    McGranahan, G H; Leslie, C A; Dandekar, A M; Uratsu, S L; Yates, I E

    1993-09-01

    A gene transfer system developed for walnut (Juglans regia L.) was successfully applied to pecan (Carya illinoensis [Wang] K. Koch). Repetitively embryogenic somatic embryos derived from open-pollinated seed of 'Elliott', 'Wichita', and 'Schley' were co-cultivated with Agrobacterium strain EHA 101/pCGN 7001, which contains marker genes for beta-glucuronidase activity and resistance to kanamycin. Several modifications of the standard walnut transformation techniques were tested, including a lower concentration of kanamycin and a modified induction medium, but these treatments had no measurable effect on efficiency of transformation. Nineteen of the 764 viable inoculated embryos produced transgenic subclones; 13 of these were from the line 'Elliott'6, 3 from 'Schley'5/3, and 3 from 'Wichita'9. Transgenic embryos of 'Wichita'9 germinated most readily and three subclones were successfully micropropagated. Three transgenic plants of one of these subclones were obtained by grafting the tissue cultured shoots to seedling pecan rootstock in the greenhouse. Gene insertion, initially detected by GUS activity, was confirmed by detection of integrated T-DNA sequences using Southern analysis.

  6. Attributes of system testing which promote cost-effectiveness

    International Nuclear Information System (INIS)

    Martin, L.C.

    1975-01-01

    A brief overview of conventional EMP testing activity examines attributes of overall systems tests which promote cost-effectiveness. The general framework represents an EMP-oriented systems test as a portion of a planned program to design, produce, and field system elements. As such, all so-called system tests should play appropriate cost-effective roles in this program, and the objective here is to disclose such roles. The intrinsic worth of such tests depends not only upon placing proper values on the outcomes, but also upon the possible eventual consequences of not doing tests. A relative worth measure is required. Attributes of EMP system testing over the range of potential activity which encompasses research and development, production, field handling, verification, evaluation, and others are reviewed and examined. Thus, the relative worth, in a cost-effective sense, is provided by relating such attributes to the overall program objectives so that values can be placed on the outcomes for tradeoff purposes

  7. 21 CFR 862.3050 - Breath-alcohol test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Breath-alcohol test system. 862.3050 Section 862.3050 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED....3050 Breath-alcohol test system. (a) Identification. A breath-alcohol test system is a device intened...

  8. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  9. Automatic Test Systems Aquisition

    National Research Council Canada - National Science Library

    1994-01-01

    We are providing this final memorandum report for your information and use. This report discusses the efforts to achieve commonality in standards among the Military Departments as part of the DoD policy for automatic test systems (ATS...

  10. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  11. Testing Real-Time Systems Using UPPAAL

    DEFF Research Database (Denmark)

    Hessel, Anders; Larsen, Kim Guldstrand; Mikucionis, Marius

    2008-01-01

    This chapter presents principles and techniques for model-based black-box conformance testing of real-time systems using the Uppaal model-checking tool-suite. The basis for testing is given as a network of concurrent timed automata specified by the test engineer. Relativized input...

  12. Beam test with the HIMAC RF control system

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sato, K.; Itano, A.

    1992-01-01

    RF system of the HIMAC synchrotron has been developed and tested in the factory. With the high power system, we could sweep the acceleration frequency from 1MHz to 8MHz with the acceleration voltage of 6KV. The performance of the RF control system has been confirmed with a developed simulator of the synchrotron oscillation. Following these two tests in the factory, we had a beam test of the RF control system at TARN-II in INS (Institute for Nuclear Study, University of Tokyo). This paper describes the beam test and its results. (author)

  13. Stress Testing of Transactional Database Systems

    OpenAIRE

    Meira , Jorge Augusto; Cunha De Almeida , Eduardo; Sunyé , Gerson; Le Traon , Yves; Valduriez , Patrick

    2013-01-01

    International audience; Transactional database management systems (DBMS) have been successful at supporting traditional transaction processing workloads. However, web-based applications that tend to generate huge numbers of concurrent business operations are pushing DBMS performance over their limits, thus threatening overall system availability. Then, a crucial question is how to test DBMS performance under heavy workload conditions. Answering this question requires a testing methodology to ...

  14. Development of autonomous vehicles’ testing system

    Science.gov (United States)

    Ivanov, A. M.; Shadrin, S. S.

    2018-02-01

    This article describes overview of automated and, in perspective, autonomous vehicles’ (AV) implementation risks. Set of activities, actual before the use of AVs on public roads, minimizing negative technical and social problems of AVs’ implementation is presented. Classification of vehicle’s automated control systems operating conditions is formulated. Groups of tests for AVs are developed and justified, sequence of AVs’ testing system formation is proposed.

  15. Simulator testing system (STS)

    International Nuclear Information System (INIS)

    Miller, V.N.

    1990-01-01

    In recent years there has been a greater demand placed on the capabilities and time usage of real-time nuclear plant simulators due to NRC, INPO and utilities requirements. The requirements applied to certification, new simulators, upgrades, modifications, and maintenance of the simulators vary; however, they all require the capabilities of the simulator to be tested whether it is for NRC 10CFR55.45b requirements, ATP testing of new simulators, ATP testing of upgrades with or without panels, adding software/hardware due to plant modifications, or analyzing software/hardware problems on the simulator. This paper describes the Simulator Testing System (STS) which addresses each one of these requirements placed on simulators. Special attention will be given to ATP testing of upgrades without the use of control room panels. The capabilities and applications of the four parts of STS which are the Display Control Software (DCS), Procedure Control Software (PCS), Display Generator Software (DGS) and the Procedure Generator Software (PGS) will be reviewed

  16. Radioactive waste incineration system cold demonstration test

    Energy Technology Data Exchange (ETDEWEB)

    Hozumi, Masahiro; Takaoku, Yoshinobu; Koyama, Shigeru; Nagae, Madoka; Seike, Yasuhiko; Yamanaka, Yasuhiro; Shibata, Kenji; Manabe, Kyoichi

    1984-12-01

    To demonstrate Waste Incineration System (WIS) which our company has been licensed by Combustion Engineering Inc., USA we installed a demonstration test plant in our Hiratsuka Research Laboratory and started the demonstration test on January 1984. One of the characteristics of this system is to be able to process many kinds of wastes with only one system, and to get high volume reduction factors. In our test plant, we processed paper, cloth, wood, polyethylene sheets as the samples of solid combustible wastes and spent ion exchange resins with incineration and processed condensed liquid wastes with spray drying. We have got good performances and enough Decontamination Factor (DF) data for the dust control equipment. In this paper, we introduce this demonstration test plant and report the test results up to date. (author).

  17. 21 CFR 864.9300 - Automated Coombs test systems.

    Science.gov (United States)

    2010-04-01

    ... Blood and Blood Products § 864.9300 Automated Coombs test systems. (a) Identification. An automated Coombs test system is a device used to detect and identify antibodies in patient sera or antibodies bound... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Automated Coombs test systems. 864.9300 Section...

  18. 21 CFR 862.1770 - Urea nitrogen test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Urea nitrogen test system. 862.1770 Section 862....1770 Urea nitrogen test system. (a) Identification. A urea nitrogen test system is a device intended to measure urea nitrogen (an end-product of nitrogen metabolism) in whole blood, serum, plasma, and urine...

  19. The Method of System Test using I/O Stimulator

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jang Yeol; Lee, Dong Young; Kim, Chang Hoi [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    In general, the software development life cycle consists of the requirement phase, design phase, implementation phase, testing phase, integration phase (software-software integration, software-hardware integration), installation phase, and operation and maintenance phase. The fundamental parts to the testing phase are component test, software integration test, software hardware integration test, and system test. Among these tests, we focused in particular on system test using I/O stimulator. The system test operates the functionality, performance, and interface because system testing falls within the scope of black box testing, which should not require knowledge of the inner design of the code or logic. The purpose of developing a system test using a I/O stimulator is to save time and effort from the functionality and performance tests. We developed an I/O stimulator for the burning system test based on the operational scenario. The hardware, software, and manmachine- interface (MMI) are fundamental parts to the I/O stimulator. Signal sources from the I/O stimulator contain analog input, analog output, digital input, digital output, a Programmable Power Supply, an RS232C Serial interface and a dual port Ethernet interface. While automation cannot reproduce everything that a software engineer can do, it can be extremely useful for the system test. However, it does require the test criteria and a well-developed test suite of the testing scripts in order to be useful. In this study, we developed a multipurpose and cost-efficient I/O stimulator using LabVIEW program instead of the testing scripts.

  20. The Method of System Test using I/O Stimulator

    International Nuclear Information System (INIS)

    Kim, Jang Yeol; Lee, Dong Young; Kim, Chang Hoi

    2016-01-01

    In general, the software development life cycle consists of the requirement phase, design phase, implementation phase, testing phase, integration phase (software-software integration, software-hardware integration), installation phase, and operation and maintenance phase. The fundamental parts to the testing phase are component test, software integration test, software hardware integration test, and system test. Among these tests, we focused in particular on system test using I/O stimulator. The system test operates the functionality, performance, and interface because system testing falls within the scope of black box testing, which should not require knowledge of the inner design of the code or logic. The purpose of developing a system test using a I/O stimulator is to save time and effort from the functionality and performance tests. We developed an I/O stimulator for the burning system test based on the operational scenario. The hardware, software, and manmachine- interface (MMI) are fundamental parts to the I/O stimulator. Signal sources from the I/O stimulator contain analog input, analog output, digital input, digital output, a Programmable Power Supply, an RS232C Serial interface and a dual port Ethernet interface. While automation cannot reproduce everything that a software engineer can do, it can be extremely useful for the system test. However, it does require the test criteria and a well-developed test suite of the testing scripts in order to be useful. In this study, we developed a multipurpose and cost-efficient I/O stimulator using LabVIEW program instead of the testing scripts

  1. 21 CFR 862.1815 - Vitamin E test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vitamin E test system. 862.1815 Section 862.1815....1815 Vitamin E test system. (a) Identification. A vitamin E test system is a device intended to measure vitamin E (tocopherol) in serum. Measurements obtained by this device are used in the diagnosis and...

  2. 21 CFR 862.1450 - Lactic acid test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Lactic acid test system. 862.1450 Section 862.1450....1450 Lactic acid test system. (a) Identification. A lactic acid test system is a device intended to measure lactic acid in whole blood and plasma. Lactic acid measurements that evaluate the acid-base status...

  3. 21 CFR 862.1730 - Free tyrosine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Free tyrosine test system. 862.1730 Section 862....1730 Free tyrosine test system. (a) Identification. A free tyrosine test system is a device intended to measure free tyrosine (an amono acid) in serum and urine. Measurements obtained by this device are used in...

  4. Prototype Engineered Barrier System Field Tests

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Beatty, J.; Buscheck, T.A.

    1989-01-01

    This paper presents selected preliminary results obtained during the first 54 days of the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed in G-Tunnel within the Nevada Test Site. The test described is a precursor to the Engineered Barrier Systems Field Tests (EBSFT). The EBSFT will consist of in situ tests of the geohydrologic and geochemical environment in the near field (within a few meters) of heaters emplaced in welded tuff to simulate the thermal effects of waste packages. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures for future investigations that will be conducted in the Exploratory Shaft Facilities of the Yucca Mountain Project (YMP). The paper discusses the evolution of hydrothermal behavior during the prototype test, including rock temperatures, changes in rock moisture content, air permeability of fractures, gas pressures, and rock mass gas-phase humidity. 10 refs., 12 figs

  5. TRENDS: The aeronautical post-test database management system

    Science.gov (United States)

    Bjorkman, W. S.; Bondi, M. J.

    1990-01-01

    TRENDS, an engineering-test database operating system developed by NASA to support rotorcraft flight tests, is described. Capabilities and characteristics of the system are presented, with examples of its use in recalling and analyzing rotorcraft flight-test data from a TRENDS database. The importance of system user-friendliness in gaining users' acceptance is stressed, as is the importance of integrating supporting narrative data with numerical data in engineering-test databases. Considerations relevant to the creation and maintenance of flight-test database are discussed and TRENDS' solutions to database management problems are described. Requirements, constraints, and other considerations which led to the system's configuration are discussed and some of the lessons learned during TRENDS' development are presented. Potential applications of TRENDS to a wide range of aeronautical and other engineering tests are identified.

  6. Acquisition system testing with superfluid helium

    International Nuclear Information System (INIS)

    Anderson, J.E.; Fester, D.A.; DiPirro, M.J.

    1988-01-01

    NASA is evaluating both a thermomechanical pump and centrifugal pump for the SHOOT experiment using capillary fluid acquisition systems. Tests were conducted for these systems with superfluid helium under adverse operating conditions. Minus one-g outflow tests were run in conjunction with the thermomechanical pump. Both fine mesh screen and porous sponges were tested. A screen acquisition device was also tested with the low-NPSH centrifugal pump. Results to date show that the screen and sponge are capable of supplying superfluid helium to the thermomechanical pump inlet against a one-g head up to four cm. This is more than sufficient for the SHOOT application. Results with the sponge were reproducible while those with the screen could not always be repeated

  7. Radioisotope Thermoelectric Generator Transporation System licensed hardware second certification test series and package shock mount system test

    International Nuclear Information System (INIS)

    Ferrell, P.C.; Moody, D.A.

    1995-10-01

    This paper presents a summary of two separate drop test a e performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of Title 10, Code of Federal Regulations, ''Part 71'' (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, Transit Drop Procedure (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G's at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G's was not exceeded in any test from a free drop height of 457 mm (18 in.)

  8. 21 CFR 862.1230 - Cyclic AMP test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cyclic AMP test system. 862.1230 Section 862.1230....1230 Cyclic AMP test system. (a) Identification. A cyclic AMP test system is a device intended to measure the level of adenosine 3′, 5′-monophosphate (cyclic AMP) in plasma, urine, and other body fluids...

  9. Automated real-time testing (ARTT) for embedded control systems (ECS)

    International Nuclear Information System (INIS)

    Hawkins, J; Howard, R; Nguyen, H.

    2001-01-01

    Many of today's automated real-time testing systems for embedded systems were developed using expensive custom hardware and software. In this article they describe how to use commercially available off-the-shelf hardware and software to design and develop an automated real-time test systems for Embedded Programmable Logic Controller (PLC) Based Control Systems. The system development began with the implementation of the VALI/TEST Pro testing methodology as a means for structuring the testing. Using this methodology, they were able to decompose system requirement documents for a Personnel Safety System (PSS) into its high, intermediate and detail level requirements. next, the validation procedures for the PSS system were decomposed into testing units called builds, test runs and test cases. To measure the PSS system's test coverage three levels of system requirements were mapped to their respective unit level of test using a specially constructed validation matrix that was designed to handle over 150 test cases and requirements. All of the above work led to the development of an Automated Real-Time Test System (ARTTS) that is capable of performing complete black box testing in real-time for Embedded PLC Based Control Systems. Also note, that the PSS system under test and mentioned in this paper is located at the Advance Photon Source (APS) at Argonne National Laboratory Basic Energy Science Facility in Argonne, Illinois

  10. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  11. Kilowatt Isotope Power System. Phase I. System test report. 78-KIPS-33

    International Nuclear Information System (INIS)

    1978-01-01

    The KIPS Ground Demonstration System (GDS) was designed to simulate, as closely as possible, a Flight System Conceptual Design (FSCD). No radiator was incorporated and electric heat sources were used in place of isotope heat sources. To minimize air in-leakage and to simulate heat losses associated with space operation, the system was operated in a vacuum chamber. Initial testing was performed on the development system which did not incorporate a high performance turbine or non-condensing configuration of the cold liquid passages in certain regenerator vapor regions. After testing of the development system and retrofit to the GDS configuration, which included improvements in the above two items, the GDS was installed in the test chamber. Testing to date showed the GDS configuration has demonstrated a system efficiency of greater than 15%. Satisfactory heat balances have been calculated on most system components, permitting evaluation of component performance. Certain performance deficiencies currently exist which prevented the 18% efficiency goal being attained. These can be corrected with further development

  12. Multisignal detecting system of pile integrity testing

    Science.gov (United States)

    Liu, Zuting; Luo, Ying; Yu, Shihai

    2002-05-01

    The low strain reflection wave method plays a principal rule in the integrating detection of base piles. However, there are some deficiencies with this method. For example, there is a blind area of detection on top of the tested pile; it is difficult to recognize the defects at deep-seated parts of the pile; there is still the planar of 3D domino effect, etc. It is very difficult to solve these problems only with the single-transducer pile integrity testing system. A new multi-signal piles integrity testing system is proposed in this paper, which is able to impulse and collect signals on multiple points on top of the pile. By using the multiple superposition data processing method, the detecting system can effectively restrain the interference and elevate the precision and SNR of pile integrity testing. The system can also be applied to the evaluation of engineering structure health.

  13. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  14. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  15. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  16. Preoperational test report, primary ventilation condensate system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-01-29

    Preoperational test report for Primary Ventilation Condensate System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides a collection point for condensate generated by the W-030 primary vent offgas cooling system serving tanks AYIOI, AY102, AZIOI, AZI02. The system is located inside a shielded ventilation equipment cell and consists of a condensate seal pot, sampling features, a drain line to existing Catch Tank 241-AZ-151, and a cell sump jet pump. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  17. Identifikasi Gen Aerolysin dan Sensitivitas Antibiotik Aeromonas Hydrophila Penyebab Kematian Tukik (Lepidochelys olivacea di Pulau Serangan, Bali

    Directory of Open Access Journals (Sweden)

    Rima Ratnanggana Prasetya

    2017-06-01

    Full Text Available The purpose of this study was to evaluate the pathogene of Aeromonas hydrophila genes (Aerolysin as the cause of Lepidochelys olivacea death and to perform the antibiotic sensitivity test for antibiotic that often used in order to provide the best antibiotic treatment in the field case. The method used was the identification test using primary cultures on Tryptic Soy Agar (TSA and Mac Conkey Agar (MCA medium, then followed by Gram staining, oxidase, catalase, and biochemical tests. Then, aerolysin genes detection was performed by using Polymerase Chain Reaction (PCR method, while oxytetracycline, chloramphenicol, streptomycin, and kanamycin were tested for their sensitivity. From five samples of dead Lepidochelys olivacea, bleeding on the liver and intestine were observed. The identification result of bacteria was found A. hydrophila, and identified the gene encoding aerolysin. The antibiotic sensitivity test showed a sensitive category of A. hydrophila with a sensitivity level were oxytetracycline, chloramphenicol, kanamycin, and streptomycin. The main cause of Lepidochelys olivacea death in Turtle Conservation and Education Centre, Serangan Island, Bali was A. hydrophila which contains aerolysin genes, in which oxytetracycline seems to be the most effective drug for the treatment. ABSTRAK Tujuan dari penelitian ini adalah membuktikan adanya gen patogen (Aerolysin pada Aeromonas hydrophila sebagai penyebab kematian tukik penyu abu-abu serta mengetahui kepekaan obat antibiotic yang sering digunakan sehingga dapat memberikan terapi yang tepat pada kasus di lapangan. Metode penelitian yang digunakan adalah uji identifikasi menggunakan kultur primer pada media Tryptic Soy Agar (TSA dan Mac Conkey Agar (MCA, dilanjutkan uji pewarnaan Gram, uji oksidase, uji katalase, dan uji biokimiawi. Setelah itu dilakukan deteksi gen aerolysin menggunakan metode Polymerase Chain Reaction (PCR, serta dilakukan uji sensitivitas antibiotik oxytetracycline

  18. Fermilab tevatron five refrigerator system tests

    International Nuclear Information System (INIS)

    Rode, C.; Ferry, R.; Leiniger, M.; Makara, J.; Misek, J.; Mizicko, D.; Richied, D.; Theilacker, J.

    1982-01-01

    The Fermilab Tevatron refrigeration system is described with the layout illustrated. The compressor control loops, the refrigerator control loops, and magnet control loops (two per refrigerator) are described and each illustrated. The mobile purifier is described. A five refrigerator test is presented, using two compressor buildings, satellite refrigerator concept test and the test current to the writing. The configuration of the five refrigerator test is diagramed

  19. INEL test plan for evaluating waste assay systems

    International Nuclear Information System (INIS)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP

  20. INEL test plan for evaluating waste assay systems

    Energy Technology Data Exchange (ETDEWEB)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  1. Routine testing on protective and safety systems and components

    International Nuclear Information System (INIS)

    Rysy, W.

    1977-01-01

    1) In-process inspection, tests during commissioning. 2) Tests during reactor operation. 2.1) Reactor protection system, for example: continuous auto-testing by a dynamic system, check of the output signals; 2.2) safety features: selected examples: functional tests on the ECCS, trial operation of the emergency diesels. 3) Tests during refuelling phase. 3.1) Containment: Leakage rate tests, leak testing; 3.2) coolant system: selected examples: inservice inspections of the pressure vessel, eddy current testing of the steam generator, functional tests of safety valves. (orig./HP) [de

  2. Powertrain instrumentation and test systems development, hybridization, electrification

    CERN Document Server

    Paulweber, Michael

    2016-01-01

    The book deals with the increasingly complex test systems for powertrain components and systems giving an overview of the diverse types of test beds for all components of an advanced powertrain focusing on specific topics such as instrumentation, control, simulation, hardware-in-the-loop, automation or test facility management. This book is intended for powertrain (component) development engineers, test bed planners, test bed operators and beginners.

  3. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  4. Multivariable Analysis of the Association Between Antimicrobial Use and Antimicrobial Resistance in Escherichia coli Isolated from Apparently Healthy Pigs in Japan.

    Science.gov (United States)

    Makita, Kohei; Goto, Masaki; Ozawa, Manao; Kawanishi, Michiko; Koike, Ryoji; Asai, Tetsuo; Tamura, Yutaka

    2016-01-01

    The objective of this study was to investigate the association between antimicrobial agent use and antimicrobial resistance in Escherichia coli isolated from healthy pigs using data from 2004 to 2007 in the Japanese Veterinary Antimicrobial Resistance Monitoring System (JVARM). Fecal E. coli isolates from 250 pigs (one isolate each from a pig per farm) were examined for antimicrobial resistance. Information on the use of antimicrobials within preceding 6 months and types of farms recorded in JVARM was collected and statistically analyzed against the resistance patterns. In the univariate analysis, associations between both therapeutic and feed additive use of antimicrobials, and resistance to dihydrostreptomycin, gentamicin, kanamycin, ampicillin, cefazolin, ceftiofur, oxytetracycline, chloramphenicol, trimethoprim, nalidixic acid, enrofloxacin, colistin, and bicozamycin, and husbandry factors were investigated. In multivariable analysis, generalized estimating equations were used to control geographical intraclass correlation. Confounding for structurally unrelated associations was tested using generalized linear models. The results suggested direct and cross selections in the associations between use of aminoglycosides in reproduction farms and resistance to kanamycin, use of tetracyclines in larger farms and resistance to oxytetracycline, use of beta-lactams and resistance to ampicillin, use of phenicols and resistance to chloramphenicol, and use of fluoroquinolones and resistance to nalidixic acid and enrofloxacin. Coselection was suggested in the use of tetracyclines and chloramphenicol resistance. The associations between use of beta-lactams and dihydrostreptomycin resistance, use of macrolides and ampicillin and oxytetracycline resistance, and use of colistin and kanamycin resistance were significant, but were confounded by the simultaneous use of homologous antimicrobials.

  5. Generic test platform for representative tests of safety I/C systems - 15546

    International Nuclear Information System (INIS)

    Fourestie, B.; Kuck, H.; Richter, J.; Rieche, S.; Waitz, M.

    2015-01-01

    In compliance with the IEC 61513 safety Instrumentation and Control (I/C) systems must be successfully validated in their final configuration prior to installation on site and commissioning. However the contingent need for modifications during system validation activities or subsequently during the commissioning phase may entail long and costly re-engineering of the I/C systems. With the view to ease these possible modifications, a Generic Test Platform has been developed by AREVA which allows combining a real I/C system subpart with an emulation server. This platform provides a faithful representation of the I/C System allowing crediting the validation test results carried out on this platform. (authors)

  6. Scheduling system for test automation framework

    NARCIS (Netherlands)

    Wahyudi, Djohan

    2014-01-01

    An Interventional X-ray (iXR) system provides real time X-ray imaging with high image clarity and low X-ray dose. After several years of development, the iXR System has become complex. In order to verify the correct operation of the system, the system integration and test group performs extensive

  7. Verification test of control rod system for HTR-10

    International Nuclear Information System (INIS)

    Zhou Huizhong; Diao Xingzhong; Huang Zhiyong; Cao Li; Yang Nianzu

    2002-01-01

    There are 10 sets of control rods and driving devices in 10 MW High Temperature Gas-cooled Test Reactor (HTR-10). The control rod system is the controlling and shutdown system of HTR-10, which is designed for reactor criticality, operation, and shutdown. In order to guarantee technical feasibility, a series of verification tests were performed, including room temperature test, thermal test, test after control rod system installed in HTR-10, and test of control rod system before HTR-10 first criticality. All the tests data showed that driving devices working well, control rods running smoothly up and down, random position settling well, and exactly position indicating

  8. Seismic proving test of process computer systems with a seismic floor isolation system

    International Nuclear Information System (INIS)

    Fujimoto, S.; Niwa, H.; Kondo, H.

    1995-01-01

    The authors have carried out seismic proving tests for process computer systems as a Nuclear Power Engineering Corporation (NUPEC) project sponsored by the Ministry of International Trade and Industry (MITI). This paper presents the seismic test results for evaluating functional capabilities of process computer systems with a seismic floor isolation system. The seismic floor isolation system to isolate the horizontal motion was composed of a floor frame (13 m x 13 m), ball bearing units, and spring-damper units. A series of seismic excitation tests was carried out using a large-scale shaking table of NUPEC. From the test results, the functional capabilities during large earthquakes of computer systems with a seismic floor isolation system were verified

  9. Performance testing SPECT systems: Recent developments

    International Nuclear Information System (INIS)

    Todd-Pokropek, A.

    1985-01-01

    A protocol is used to test as many currently available systems as possible, including both rotating gamma camera systems from GE, Siemens, Toshiba, Technicare, Elscint, Philips, Picker, etc, and single/multi slice system such as the Medimatic. This paper indicates changes that have occurred with respect to preliminary results previously published. Reconstructions were performed in a standard manner, using a Ramp filter and without attenuation correction, in order to reduce the effect of differences in software. The Jaszczak phantom was used to assess overall image quality. Tests were performed using the different collimators available. Image quality improved with better spatial resolution, even at the expense of sensitivity. Non-circular orbits, where available, were tested, and resolution was comparing for various positions and directions. With double headed systems, the results obtained were compared to those using a single head alone. Some gain in image quality seems to have been achieved by better uniformity resulting from improved correction circuitry, by the use of non-circular orbits, and from scatter correction. Potential still exists to improve collimator design

  10. Data acquisition and test system software

    International Nuclear Information System (INIS)

    Bourgeois, N.A. Jr.

    1979-03-01

    Sandia Laboratories has been assigned the task by the Base and Installation Security Systems (BISS) Program Office to develop various aspects of perimeter security systems. One part of this effort involves the development of advanced signal processing techniques to reduce the false and nuisance alarms from sensor systems while improving the probability of intrusion detection. The need existed for both data acquisition hardware and software. Also, the hardware is used to implement and test the signal processing algorithms in real time. The hardware developed for this signal processing task is the Data Acquisition and Test System (DATS). The programs developed for use on DATS are described. The descriptions are taken directly from the documentation included within the source programs themselves

  11. Antibiotic Resistance in Staphylococcus aureus and Coagulase Negative Staphylococci Isolated from Goats with Subclinical Mastitis

    Directory of Open Access Journals (Sweden)

    Salvatore Virdis

    2010-01-01

    Full Text Available Antimicrobial resistance patterns and gene coding for methicillin resistance (mecA were determined in 25 S. aureus and 75 Coagulase Negative Staphylococci (CNS strains isolates from half-udder milk samples collected from goats with subclinical mastitis. Fourteen (56.0% S. aureus and thirty-one (41.3% CNS isolates were resistant to one or more antimicrobial agents. S. aureus showed the highest resistance rate against kanamycin (28.0%, oxytetracycline (16.0%, and ampicillin (12.0%. The CNS tested were more frequently resistant to ampicillin (36.0% and kanamycin (6.7%. Multiple antimicrobial resistance was observed in eight isolates, and one Staphylococcus epidermidis was found to be resistant to six antibiotics. The mecA gene was not found in any of the tested isolates. Single resistance against β-lactamics or aminoglicosides is the most common trait observed while multiresistance is less frequent.

  12. A game-theoretic approach to real-time system testing

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Li, Shuhao

    2008-01-01

    This paper presents a game-theoretic approach to the testing of uncontrollable real-time systems. By modelling the systems with Timed I/O Game Automata and specifying the test purposes as Timed CTL formulas, we employ a recently developed timed game solver UPPAAL-TIGA to synthesize winning...... strategies, and then use these strategies to conduct black-box conformance testing of the systems. The testing process is proved to be sound and complete with respect to the given test purposes. Case study and preliminary experimental results indicate that this is a viable approach to uncontrollable timed...... system testing....

  13. Test-Access Planning and Test Scheduling for Embedded Core-Based System Chips

    OpenAIRE

    Goel, Sandeep Kumar

    2005-01-01

    Advances in the semiconductor process technology enable the creation of a complete system on one single die, the so-called system chip or SOC. To reduce time-to-market for large SOCs, reuse of pre-designed and pre-veried blocks called cores is employed. Like the design style, testing of SOCs can be best approached in a core-based fashion. In order to enable core-based test development, an embedded core should be isolated from its surrounding circuitry and electrical test access from chip pins...

  14. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  15. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  16. Software Sub-system in Loading Automatic Test System for the Measurement of Power Line Filters

    Directory of Open Access Journals (Sweden)

    Yu Bo

    2017-01-01

    Full Text Available The loading automatic test system for measurement of power line filters are in urgent demand. So the software sub-system of the whole test system was proposed. Methods: structured the test system based on the virtual instrument framework, which consisted of lower and up computer and adopted the top down approach of design to perform the system and its modules, according to the measurement principle of the test system. Results: The software sub-system including human machine interface, data analysis and process software, expert system, communication software, control software in lower computer, etc. had been designed. Furthermore, it had been integrated into the entire test system. Conclusion: This sub-system provided a fiendly software platform for the whole test system, and had many advantages such as strong functions, high performances, low prices. It not only raises the test efficiency of EMI filters, but also renders some creativities.

  17. 21 CFR 862.1515 - Nitrogen (amino-nitrogen) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Nitrogen (amino-nitrogen) test system. 862.1515... Systems § 862.1515 Nitrogen (amino-nitrogen) test system. (a) Identification. A nitrogen (amino-nitrogen) test system is a device intended to measure amino acid nitrogen levels in serum, plasma, and urine...

  18. Supernatant treatment system design through testing

    International Nuclear Information System (INIS)

    Ploetz, D.K.; Leonard, I.M.

    1988-12-01

    The main purpose of the Supernatant Treatment System (STS) is to remove more than 99.9 percent of the radioactive cesium (Cs-137) from the high-level waste stored in tank 8D-2. Cesium removal is accomplished in the STS by processing the supernatant (liquid) portion of the high-level waste through three or four ion exchange columns filled with zeolite. After treatment in the STS, the decontaminated supernatant is processed as low-level waste and finally encapsulated in cement for eventual disposal. The Cs-137 removed from the waste and absorbed onto zeolite ion exchange material is temporarily stored in tank 8D-1 until it can be encapsulated in glass and disposed of as high-level waste. This report discusses construction and testing of the STS. Design of the STS was started in 1982 in parallel with the selection of the ion exchange material. The construction of this system was accomplished in five phase in parallel with completion of design to allow for faster completion of the project. The existing high-level waste storage tanks -- 8D-1, 8D-2, and 8D-3 -- required major renovations to permit transfer of the high-level waste from tank 8D-2 to tank 8D-1, to house the components that comprise the STS in tank 8D-1, and to store decontaminated wastes in tank 8D-3. Testing in the STS started before construction was complete and was accomplished by first testing components individually. Then the system was retested using simulated supernatant. Integrated testing of the whole Integrated Radwaste Treatment System (IRTS), which includes the STS, Liquid Waste Treatment System (LWTS), Cement Solidification System (CSS), and the Drum Cell, was also performed using simulated supernatant. Finally, slightly radioactive condensate water from tank 8D-1 was processed. After successfully completing this testing, the STS started operations with radioactive supernatant on May 23, 1988. 21 refs., 33 figs., 21 tabs

  19. Test plan for qualification testing of the 241-SY-101 Flexible Receiver System

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    A mixer pump was installed in tank 241-SY-101 on July 3, 1993, to support hydrogen mitigation testing. This test mixer pump has proven to be very successful in mitigating the large gas releases, or ''burps,'' from the tank waste. Therefore, a decision has been made to fabricate a spare pump that will be installed upon failure of the existing test pump. Before replacement activities can be initiated, equipment must be available to remove the existing pump. A pump removal system is currently being designed and fabricated that will support the retrieval, transportation and disposal of the existing pump. The Equipment Removal System consists of six major components: the flexible receiver system (FRS), the equipment storage container, the container strongback system, the container transport trailer, the support cranes, and the pump washdown system

  20. Testing and reference model analysis of FTTH system

    Science.gov (United States)

    Feng, Xiancheng; Cui, Wanlong; Chen, Ying

    2009-08-01

    With rapid development of Internet and broadband access network, the technologies of xDSL, FTTx+LAN , WLAN have more applications, new network service emerges in endless stream, especially the increase of network game, meeting TV, video on demand, etc. FTTH supports all present and future service with enormous bandwidth, including traditional telecommunication service, traditional data service and traditional TV service, and the future digital TV and VOD. With huge bandwidth of FTTH, it wins the final solution of broadband network, becomes the final goal of development of optical access network.. Fiber to the Home (FTTH) will be the goal of telecommunications cable broadband access. In accordance with the development trend of telecommunication services, to enhance the capacity of integrated access network, to achieve triple-play (voice, data, image), based on the existing optical Fiber to the curb (FTTC), Fiber To The Zone (FTTZ), Fiber to the Building (FTTB) user optical cable network, the optical fiber can extend to the FTTH system of end-user by using EPON technology. The article first introduced the basic components of FTTH system; and then explain the reference model and reference point for testing of the FTTH system; Finally, by testing connection diagram, the testing process, expected results, primarily analyze SNI Interface Testing, PON interface testing, Ethernet performance testing, UNI interface testing, Ethernet functional testing, PON functional testing, equipment functional testing, telephone functional testing, operational support capability testing and so on testing of FTTH system. ...

  1. 21 CFR 862.3080 - Breath nitric oxide test system.

    Science.gov (United States)

    2010-04-01

    ... Systems § 862.3080 Breath nitric oxide test system. (a) Identification. A breath nitric oxide test system... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Breath nitric oxide test system. 862.3080 Section... fractional nitric oxide concentration in expired breath aids in evaluating an asthma patient's response to...

  2. 21 CFR 862.1640 - Protein-bound iodine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Protein-bound iodine test system. 862.1640 Section... Systems § 862.1640 Protein-bound iodine test system. (a) Identification. A protein-bound iodine test system is a device intended to measure protein-bound iodine in serum. Measurements of protein-bound...

  3. Design and simulations for RFPI system test jig

    International Nuclear Information System (INIS)

    Keshwani, Rajesh; Khole, Shailesh; Sujo, C.I.; Shukla, Hitesh; Afaash, M.; Bharade, Sandeep; Joshi, Gopal

    2015-01-01

    RFPI system for condition monitoring and protection of RF systems of LEHIPA has been designed. The intention of this system is to protect and monitor different high power RF components. The system consists of variety of analog and digital cards to process, acquire and monitor signals from RF sensors, photo multiplier tubes (PMT), field emission probes, photo sensors, etc. The system can also accept and process digital inputs or contacts and analog input signals from other subsystems, indicating their status. It comprises of analog signal processing electronics, condition monitoring, data acquisition and fault reporting features. Since RFPI system should process and take action within prescribed time limit, the testing of system is critical issue. In order to carry out stand-alone field testing of such elaborate electronic system, variety of carefully designed electronic test circuit with suitable rangeability is required. These include fast current sources, fast amplifiers, fast rectifiers, etc. This paper elaborates on specifications, design approach, circuit design and simulations for various circuits used in test jig

  4. Aviation Systems Test and Integration Lab (AvSTIL)

    Data.gov (United States)

    Federal Laboratory Consortium — The Aviation Systems Test and Integration Laboratory offers an innovative approach to aviation system and subsystem testing by fully immersing aviation platforms in...

  5. Pelamis WEC - full-scale joint system test

    Energy Technology Data Exchange (ETDEWEB)

    Yemm, R.

    2003-07-01

    This report describes the building and testing of a full-scale Pelamis Wave Energy Converter (WEC) two-axis joint system using a laboratory joint test rig. The main project objective to develop an intermediate demonstration model to confirm full scale control, hydraulic and data acquisition systems is discussed, and the key objectives of the programme are listed. Details are given of the semi-submerged articulated structure of cylindrical elements linked by hinged joints, and the integrated testing of all key components. A summary of the work programme and a description of the test rig are presented.

  6. QUASI-RANDOM TESTING OF COMPUTER SYSTEMS

    Directory of Open Access Journals (Sweden)

    S. V. Yarmolik

    2013-01-01

    Full Text Available Various modified random testing approaches have been proposed for computer system testing in the black box environment. Their effectiveness has been evaluated on the typical failure patterns by employing three measures, namely, P-measure, E-measure and F-measure. A quasi-random testing, being a modified version of the random testing, has been proposed and analyzed. The quasi-random Sobol sequences and modified Sobol sequences are used as the test patterns. Some new methods for Sobol sequence generation have been proposed and analyzed.

  7. TTCN-3 for distributed testing embedded systems

    NARCIS (Netherlands)

    Blom, S.C.C.; Deiß, T.; Ioustinova, N.; Kontio, A.; Pol, van de J.C.; Rennoch, A.; Sidorova, N.; Virbitskaite, I.; Voronkov, A.

    2007-01-01

    Abstract. TTCN-3 is a standardized language for specifying and executing test suites that is particularly popular for testing embedded systems. Prior to testing embedded software in a target environment, the software is usually tested in the host environment. Executing in the host environment often

  8. Railcar waste transfer system hydrostatic test report

    International Nuclear Information System (INIS)

    Ellingson, S.D.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per HNF-SD-W417-ATP-001, ''Rail car Waste Transfer System Hydrostatic Test''. The test was completed and approved without any problems or exceptions

  9. 21 CFR 866.5640 - Infectious mononucleosis immunological test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Infectious mononucleosis immunological test system....5640 Infectious mononucleosis immunological test system. (a) Identification. An infectious mononucleosis immunological test system is a device that consists of the reagents used to measure by...

  10. Testing of modular industrial solar retrofit industrial process steam systems

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.

    1984-06-13

    Under the Department of Energy's Modular Industrial Solar Retrofit project, five industrial process heat systems incorporating line-focus solar collectors were designed and hardware was installed and tested at Sandia National Laboratories and the Solar Energy Research Institute. System designers and collector manufacturers participating in the project included Acurex Solar Corporation, BDM, Inc., Custom Engineering, Inc., Foster Wheeler Solar Development Corporation, Solar Kinetics, Inc., and Suntec Systems, Inc. This paper describes the testing of the qualification test systems which has been under way since mid-1982. Each qualification test system includes an equipment skid sufficient to support a collector field of 2300 m/sup 2/ aperture and one delta-tempeature string of from 175 to 460 m/sup 2/ aperture. Each system is capable of producing saturated steam at 1.7 MPa and operates at maximum outlet temperatures of from 250 to 290/sup 0/C. The test series includes function and safety tests to determine that the systems operate as specified, an unattended operation test of at least two weeks duration, performance tests to allow prediction of annual system performance, and life cycle tests to evaluate component lifetime and maintenance requirements. Since the start of testing, some twenty five modifications have been made to the various systems for the purpose of improving system performance and/or reliability, and appropriate tests of these modifictions have been made or are underway. This paper presents a description of the approach to testing of the MISR systems and selected test results.

  11. Diversity and testing requirements of programmable automation systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.

    1993-04-01

    In the report programmable digital operation and safety automation systems for nuclear power plants are discussed. The programmable systems deviate by their properties and behaviour from the conventional non-programmable systems in such extent, that their verification and validation for safety critical applications requires new methods and practices. The safety assessment can not be based on conventional probabilistic methods due to the difficulties in the quantification of the reliability of the software and hardware. A safety critical programmable system shall include diverse redundant parts so that no residual program fault can not cause the failure of the intended function of the system. Although complete testing of a programmable system is impossible, different tests have a central role in the production and validation process of the system. Diversity is important also in confidence building measures for the implemented system. Independent analysis and testing of the system should use different methods and tools from those used in the production and validation process by the system vendor. Use of diversity and testing are concluded to be central issues in producing safe programmable system and in proving them to be safe enough. By combining functional and programming diversity in a suitable way one can produce a system that is safe enough without having a non-programmable back-up system. (48 refs., 10 figs., 2 tabs.)

  12. Antimicrobial susceptibility and serotypes of Actinobacillus (Haemophilus) pleuropneumoniae recovered from Missouri swine.

    Science.gov (United States)

    Fales, W H; Morehouse, L G; Mittal, K R; Bean-Knudsen, C; Nelson, S L; Kintner, L D; Turk, J R; Turk, M A; Brown, T P; Shaw, D P

    1989-01-01

    The antimicrobial susceptibility of 73 Actinobacillus (Haemophilus) pleuropneumoniae isolates from swine in Missouri was determined with a microdilution minimal inhibitory concentration test system. Serotyping was accomplished by means of co-agglutination. Serotype 1 (39/73) and serotype 5 (30/73) were commonly found, whereas serotype 7 (4/73) was infrequently encountered. Most isolates (MIC90) were found susceptible to ampicillin (amoxicillin), cephalothin, penicillin, erythromycin, gentamicin, and kanamycin. Marked resistance was found with oxytetracycline, tylosin, and sulfadimethoxine. The data indicate that use of ampicillin (amoxicillin) or penicillin may correlate well with the favorable outcome of treatment.

  13. Spaceport Command and Control System User Interface Testing

    Science.gov (United States)

    Huesman, Jacob

    2016-01-01

    The Spaceport Command and Control System will be the National Aeronautics and Space Administration's newest system for launching commercial and government owned spacecraft. It's a large system with many parts all in need of testing. To improve upon testing already done by NASA engineers, the Engineering Directorate, Electrical Division (NE-E) of Kennedy Space Center has hired a group of interns each of the last few semesters to develop novel ways of improving the testing process.

  14. Testing of a Wireless Sensor System for Instrumented Thermal Protection Systems

    Science.gov (United States)

    Kummer, Allen T.; Weir, Erik D.; Morris, Trey J.; Friedenberger, Corey W.; Singh, Aseem; Capuro, Robert M.; Bilen, Sven G.; Fu, Johnny; Swanson, Gregory T.; Hash, David B.

    2011-01-01

    Funded by NASA's Constellation Universities Institutes Project (CUIP), we have been developing and testing a system to wirelessly power and collect data from sensors on space platforms in general and, in particular, the harsh environment of spacecraft re-entry. The elimination of wires and associated failures such as chafing, sparking, ageing, and connector issues can increase reliability and design flexibility while reducing costs. These factors present an appealing case for the pursuit of wireless solutions for harsh environments, particularly for their use in space and on spacecraft. We have designed and built a prototype wireless sensor system. The system, with capabilities similar to that of a wired sensor system, was tested in NASA Ames Research Center s Aerodynamic Heating Facility and Interaction Heating Facility. This paper discusses the overall development effort, testing results, as well as future directions.

  15. Tritium Systems Test Facility. Volume I

    International Nuclear Information System (INIS)

    Anderson, G.W.; Battleson, K.W.; Bauer, W.

    1976-10-01

    Sandia Laboratories proposes to build and operate a Tritium Systems Test Facility (TSTF) in its newly completed Tritium Research Laboratory at Livermore, California (see frontispiece). The facility will demonstrate at a scale factor of 1:200 the tritium fuel cycle systems for an Experimental Power Reactor (EPR). This scale for each of the TSTF subsystems--torus, pumping system, fuel purifier, isotope separator, and tritium store--will allow confident extrapolation to EPR dimensions. Coolant loop and reactor hall cleanup facilities are also reproduced, but to different scales. It is believed that all critical details of an EPR tritium system will be simulated correctly in the facility. Tritium systems necessary for interim devices such as the Ignition Test Reactor (ITR) or The Next Step (TNS) can also be simulated in TSTF at other scale values. The active tritium system will be completely enclosed in an inert atmosphere glove box which will be connected to the existing Gas Purification System (GPS) of the Tritium Research Laboratory. In effect, the GPS will become the scaled environmental control system which otherwise would have to be built especially for the TSTF

  16. Integration Tests of the Muon System

    CERN Multimedia

    Cerutti, F; Palestini, S

    A complex large-size prototype of the Muon system is installed in the test area H8B in Prévessin; the set-up includes chambers belonging to the three layers of the Barrel Spectrometer (on the right in Figure 1), and chambers belonging to one octant of the End Cap Spectrometer (center and left side of Figure 1). Figure 1: Set-up of the Muon spectrometer integration test. The installation accurately reproduces the geometry of regions of the ATLAS Muon Spectrometer, with the H8 beam-line crossing the detectors at positions/angles corresponding to particles with polar angle of 75 ± 4 and 15 ± 4 degrees, respectively for the Barrel and the End Cap. A comprehensive test program is being carried out with this set-up, ranging from tests of support frames (octant of the MDT BigWheel and of the SmallWheel) and of handling/installation of tracking chambers, to real-size tests of the alignment systems, together with accurate studies of performance and calibration of the precision chambers, and with develo...

  17. A semiautomated computer-interactive dynamic impact testing system

    International Nuclear Information System (INIS)

    Alexander, D.J.; Nanstad, R.K.; Corwin, W.R.; Hutton, J.T.

    1989-01-01

    A computer-assisted semiautomated system has been developed for testing a variety of specimen types under dynamic impact conditions. The primary use of this system is for the testing of Charpy specimens. Full-, half-, and third-size specimens have been tested, both in the lab and remotely in a hot cell for irradiated specimens. Specimens are loaded into a transfer device which moves the specimen into a chamber, where a hot air gun is used to heat the specimen, or cold nitrogen gas is used for cooling, as required. The specimen is then quickly transferred from the furnace to the anvils and then broken. This system incorporates an instrumented tup to determine the change in voltage during the fracture process. These data are analyzed by the computer system after the test is complete. The voltage-time trace is recorded with a digital oscilloscope, transferred to the computer, and analyzed. The analysis program incorporates several unique features. It interacts with the operator and identifies the maximum voltage during the test, the amount of rapid fracture during the test (if any), and the end of the fracture process. The program then calculates the area to maximum voltage and the total area under the voltage-time curve. The data acquisition and analysis part of the system can also be used to conduct other dynamic testing. Dynamic tear and precracked specimens can be tested with an instrumented tup and analyzed in a similar manner. 3 refs., 7 figs

  18. Testing power system controllers by real-time simulation

    DEFF Research Database (Denmark)

    Venne, Philippe; Guillaud, Xavier; Sirois, Frédéric

    2007-01-01

    In this paper, we present a number of state-of-the art methods for testing power system controllers based on the use of a real-time power system simulator. After introducing Hypersim, we list and discuss the different means of connection between the controller under tests and the power system...

  19. An Intelligent Tutoring System for Nondestructive Testing Training

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. K.; Koh, S. N. [Joong Ang Inspection Co., Seoul (Korea, Republic of); Kim, M. K.; Shim, Y. J. [Ajou University, Suwon (Korea, Republic of)

    1998-02-15

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing

  20. An Intelligent Tutoring System for Nondestructive Testing Training

    International Nuclear Information System (INIS)

    Kim, J. K.; Koh, S. N.; Kim, M. K.; Shim, Y. J.

    1998-01-01

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing

  1. 21 CFR 862.3580 - Lysergic acid diethylamide (LSD) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Lysergic acid diethylamide (LSD) test system. 862... Test Systems § 862.3580 Lysergic acid diethylamide (LSD) test system. (a) Identification. A lysergic acid diethylamide (LSD) test system is a device intended to measure lysergic acid diethylamide, a...

  2. SCT module testing system at Charles University in Prague

    CERN Document Server

    Broklova, Z; Dolezal, Z; Kodys, P; Kubik, P; Reznicek, P

    2003-01-01

    Detector control system (DCS) is built up to ensure adequate environment conditions during mass testing of silicon strip modules for ATLAS Inner Detector. DCS protects modules against damage and simplifies the whole testing procedure as well. In the automatic mode, the system measures several environmental parameters and checks them. In case of accident or unexpected situation, it alerts operator of the system (for example via email). It can safely stop all testing. The system also contains components for remote observation plus control of the testing status.

  3. Nightly Test system migration

    CERN Document Server

    Win-Lime, Kevin

    2013-01-01

    The summer student program allows students to participate to the Cern adventure. They can follow several interesting lectures about particle science and participate to the experiment work. As a summer student, I had worked for LHCb experiment. LHCb uses a lot of software to analyze its data. All this software is organized in packages and projects. They are built and tested during the night using an automated system and the results are displayed on a web interface. Actually, LHCb is changing this system. It is looking for a replacement candidate. So I was charged to unify some internal interfaces to permit a swift migration. In this document, I will describe shortly the system used by LHCb, then I will explain what I have done in detail.

  4. Antibacterial activity of four Gracilaria species of red seaweeds collected from Mandapam Coast, Gulf of Mannar Marine Biosphere Reserve, India

    Directory of Open Access Journals (Sweden)

    Sethu Rameshkumar

    2016-09-01

    Full Text Available Objective: To study the antibacterial activities of diethyl ether, toluene, ethanol and methanol extracts of red seaweeds such as Gracilaria crassa (G. crassa, Gracilaria folifera (G. folifera, Gracilaria debilis (G. debilis and Gracilaria corticata. Methods: The crude extracts were tested against different types of Gram-positive and -negative bacterial strains and all the seaweed extracts were tested a broad spectrum of antibacterial activity. Antibacterial activity was made using paper disc diffusion method. Four organic solvents (diethyl ether, toluene, methanol and ethanol were used separately in a Soxhlet apparatus for seven bacterial strains. Antibacterial activity of the known antibiotics such as chloramphenicol, streptomycin, kanamycin and ampicillin was determined by testing them against different test organisms. Results: The high antibacterial activity was noted in the extracts of G. crassa, G. folifera and G. debilis. However, G. crassa and G. debilis have good antibacterial activity. Pathogens like Bacillus subtilis and Escherichia coli were less susceptible to the methanol and diethyl ether extracts of G. folifera. The comparative study on the antibacterial activity was also made by using 200 μg concentration of solvent extracts (diethyl ether, ethanol, toluene and methanoland different five antibiotics such as chloramphenicol, streptomycin, kanamycin, amoxicillin and ampicillin. The bacterial strains tested were more sensitive to chloramphenicol, streptomycin, kanamycin, and ampicillin when compared to algal extracts. Conclusions: The present study proved that the extracts of G. crassa, G. folifera and G. debilis have high antibacterial activity. Although G. crassa and G. debilis showed good antibacterial activity, many known antibiotics are active against a few organisms individually. Hence, the extracts of seaweeds were active against all test organisms used and the activities were comparable to that of antibiotics and the

  5. Testing of a new morphing trailing edge flap system on a novel outdoor rotating test rig

    DEFF Research Database (Denmark)

    Aagaard Madsen, Helge; Barlas, Athanasios; Løgstrup Andersen, Tom

    2015-01-01

    The morphing trailing edge system or flap system, CRTEF, has been developed over the last 10 years at DTU Wind Energy. After a promising wind tunnel test of the system in 2009 the INDUFLAP project has been carried out from 2011-2014 to transfer the technology from laboratory to industrial...... manufacturing and application. To narrow the gap between wind tunnel testing and full scale prototype testing we developed the rotating test rig. The overall objectives with the rotating test rig are: 1) to test the flap system in a realistic rotating environment with a realistic g-loading; 2) to measure...... the flap performance in real turbulent inflow and 3) to test the flap system in a realistic size and Reynolds number when comparing with full scale applications.. The rotating test rig consists of a 2.2m blade section attached to a 10m boom and mounted on a 100kW turbine platform. It was installed in June...

  6. 21 CFR 862.3250 - Cocaine and cocaine metabolite test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cocaine and cocaine metabolite test system. 862... Test Systems § 862.3250 Cocaine and cocaine metabolite test system. (a) Identification. A cocaine and cocaine metabolite test system is a device intended to measure cocaine and a cocaine metabolite...

  7. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    Science.gov (United States)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  8. CMS Forward Pixel Upgrade Electronics and System Testing

    CERN Document Server

    Weber, Hannsjorg Artur

    2016-01-01

    This note discusses results of electronics and system testing of the CMS forward pixel (FPIX) detector upgrade for Phase 1. The FPIX detector is comprised of four stand-alone half cylinders, each of which contains frontend readout electronic boards, power regulators, cables and fibers in addition to the pixel modules. All of the components undergo rigorous testing and quality assurance before assembly into the half cylinders. Afterwards, we perform full system tests on the completely assembled half cylinders, including calibrations at final operating temperatures, characterization of the realistic readout chain, and system grounding and noise studies. The results from all these tests are discussed.

  9. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  10. Legacy Vehicle Fuel System Testing with Intermediate Ethanol Blends

    Energy Technology Data Exchange (ETDEWEB)

    Davis, G. W.; Hoff, C. J.; Borton, Z.; Ratcliff, M. A.

    2012-03-01

    The effects of E10 and E17 on legacy fuel system components from three common mid-1990s vintage vehicle models (Ford, GM, and Toyota) were studied. The fuel systems comprised a fuel sending unit with pump, a fuel rail and integrated pressure regulator, and the fuel injectors. The fuel system components were characterized and then installed and tested in sample aging test rigs to simulate the exposure and operation of the fuel system components in an operating vehicle. The fuel injectors were cycled with varying pulse widths during pump operation. Operational performance, such as fuel flow and pressure, was monitored during the aging tests. Both of the Toyota fuel pumps demonstrated some degradation in performance during testing. Six injectors were tested in each aging rig. The Ford and GM injectors showed little change over the aging tests. Overall, based on the results of both the fuel pump testing and the fuel injector testing, no major failures were observed that could be attributed to E17 exposure. The unknown fuel component histories add a large uncertainty to the aging tests. Acquiring fuel system components from operational legacy vehicles would reduce the uncertainty.

  11. Applications of the automatic ultrasonic testing system ALOK combined with a phased array system

    International Nuclear Information System (INIS)

    Stanger, H.K.; Kappes, W.; Licht, R.; Bohn, H.; Barbian, O.A.

    1987-01-01

    The combination of the automatic testing system ALOK with a controlled probe in the form of a phased array device is a possibility to meet the high requirements on the test method with regard to the statements of the test as well as the requirements on the reduction of operation and preparation times. The system's applications are not limited to the testing of reactors in nuclear technology (basic tests and recurring tests of the RPV and other primary circuit components); they are also of great importance in the non-nuclear sector e.g. the testing of pipelines, of reactors in the chemical field and of offshore structures as well as tests of components in the field of production. The modularity of the system permits an adaptation to the particular testing task with the possibility of using different manipulation and hardware systems. (orig./DG) [de

  12. Light-emitting device test systems

    Science.gov (United States)

    McCord, Mark; Brodie, Alan; George, James; Guan, Yu; Nyffenegger, Ralph

    2018-01-23

    Light-emitting devices, such as LEDs, are tested using a photometric unit. The photometric unit, which may be an integrating sphere, can measure flux, color, or other properties of the devices. The photometric unit may have a single port or both an inlet and outlet. Light loss through the port, inlet, or outlet can be reduced or calibrated for. These testing systems can provide increased reliability, improved throughput, and/or improved measurement accuracy.

  13. Preoperational test report, recirculation condenser cooling systems

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-04

    This represents a preoperational test report for Recirculation Condenser Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The four system provide condenser cooling water for vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102. Each system consists of a valved piping loop, a pair of redundant recirculation pumps, a closed-loop evaporative cooling tower, and supporting instrumentation; equipment is located outside the farm on concrete slabs. Piping is routed to the each ventilation condenser inside the farm via below-grade concrete trenches. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  14. Preoperational test report, recirculation condenser cooling systems

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Recirculation Condenser Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The four system provide condenser cooling water for vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102. Each system consists of a valved piping loop, a pair of redundant recirculation pumps, a closed-loop evaporative cooling tower, and supporting instrumentation; equipment is located outside the farm on concrete slabs. Piping is routed to the each ventilation condenser inside the farm via below-grade concrete trenches. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  15. 40 CFR 792.90 - Animal and other test system care.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Animal and other test system care. 792... Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and care of animals and other test systems. (b) All newly received test systems from...

  16. Tritium Systems Test Facility

    International Nuclear Information System (INIS)

    Cafasso, F.A.; Maroni, V.A.; Smith, W.H.; Wilkes, W.R.; Wittenberg, L.J.

    1978-01-01

    This TSTF proposal has two principal objectives. The first objective is to provide by mid-FY 1981 a demonstration of the fuel cycle and tritium containment systems which could be used in a Tokamak Experimental Power Reactor for operation in the mid-1980's. The second objective is to provide a capability for further optimization of tritium fuel cycle and environmental control systems beyond that which is required for the EPR. The scale and flow rates in TSTF are close to those which have been projected for a prototype experimental power reactor (PEPR/ITR) and will permit reliable extrapolation to the conditions found in an EPR. The fuel concentrations will be the same as in an EPR. Demonstrations of individual components of the deuterium-tritium fuel cycle and of monitoring, accountability and containment systems and of a maintenance methodology will be achieved at various times in the FY 1979-80 time span. Subsequent to the individual component demonstrations--which will proceed from tests with hydrogen (and/or deuterium) through tracer levels of tritium to full operational concentrations--a complete test and demonstration of the integrated fuel processing and tritium containment facility will be performed. This will occur near the middle of FY 1981. Two options were considered for the TSTF: (1) The modification of an existing building and (2) the construction of a new facility

  17. 40 CFR 160.90 - Animal and other test system care.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Animal and other test system care. 160... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test... care of animals and other test systems. (b) All newly received test systems from outside sources shall...

  18. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  19. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    Science.gov (United States)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  20. Modification and upgradation of corrosion fatigue testing system

    International Nuclear Information System (INIS)

    Farooq, A.; Qamar, R.

    2006-08-01

    Stress Corrosion Cracking (SCC) and Corrosion Fatigue (CF) are important tests which are performed to check the integrity of structural materials operating in different environments, such as nuclear power system, steam and gas turbines, aircraft marine structure, pipelines and bridges. To establish the environmental testing facility on laboratory scale, NMD acquired a computerized (286 Based PC) electromechanical testing machine from M/S CorTest, USA. This machine was commissioned at NMD in 1989. Since then it has been utilized to test and qualify the materials provided by different establishments of PAEC for SCC and CF behavior. However, in October 2004, computer attached to the machine was corrupted and became out of order. Users were handicapped because there was no any alternate system i.e. Manual control tower to operate the machine. Then users approached to Computer Division to investigate the malfunctioning at the computer. Therefore, upon complete checkup of system, it was diagnosed that there was a serious problem in the hard disk and mother board of the computer. Much difficulty was faced in retrieving the application software from the obsolete 286 computer system. Then the basic aim was to replace the old computer with Pentium System. But with Pentium system application software was not working. Since we have already recovered full application software package including source programs, so all the seventeen programs has been thoroughly studied. Four programs had to be modified according to the new hardware. Now the new Pentium system with modified software has been interfaced with the machine. Machine was tested for the both types of above mentioned tests and compared with previous results. The performance of machine was confirmed satisfactory on the new setup. (author)

  1. Acceptance test report for 241-AW process air system

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    The acceptance test procedure (ATP) for the compressed air system at building 241-AW-273 was completed on March 11, 1993. The system was upgraded to provide a reliable source of compressed air to the tank farm. The upgrade included the demolition of the existing air compressor and associated piping, as well as the installation of a new air compressor with a closed loop cooling system. A compressed air cross-tie was added to allow the process air compressor to function as a back-up to the existing instrument air compressor. The purpose of the ATP was to achieve three primary objectives: verify system upgrade in accordance with the design media; provide functional test of system components and controls; and prepare the system for the Operational Test. The ATP was successfully completed with thirteen exceptions, which were resolved prior to completing the acceptance test. The repaired exceptions had no impact to safety or the environment and are briefly summarized. Testing ensured that the system was installed per design, that its components function as required and that it is ready for operational testing and subsequent turnover to operations

  2. UTILITY ADVANCED TURBINE SYSTEMS(ATS) TECHNOLOGY READINESS TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2001-06-01

    The following paper provides an overview of GE's H System{trademark} technology, and specifically, the design, development, and test activities associated with the DOE Advanced Turbine Systems (ATS) program. There was intensive effort expended in bringing this revolutionary advanced technology program to commercial reality. In addition to describing the magnitude of performance improvement possible through use of H System{trademark} technology, this paper discusses the technological milestones during the development of the first 9H (50Hz) and 7H (60 Hz) gas turbines. To illustrate the methodical product development strategy used by GE, this paper discusses several technologies that were essential to the introduction of the H System{trademark}. Also included are analyses of the series of comprehensive tests of materials, components and subsystems that necessarily preceded full scale field testing of the H System{trademark}. This paper validates one of the basic premises with which GE started the H System{trademark} development program: exhaustive and elaborate testing programs minimized risk at every step of this process, and increase the probability of success when the H System{trademark} is introduced into commercial service. In 1995, GE, the world leader in gas turbine technology for over half a century, in conjunction with the DOE National Energy Technology Laboratory's ATS program, introduced its new generation of gas turbines. This H System{trademark} technology is the first gas turbine ever to achieve the milestone of 60% fuel efficiency. Because fuel represents the largest individual expense of running a power plant, an efficiency increase of even a single percentage point can substantially reduce operating costs over the life of a typical gas-fired, combined-cycle plant in the 400 to 500 megawatt range. The H System{trademark} is not simply a state-of-the-art gas turbine. It is an advanced, integrated, combined-cycle system in which every

  3. System Design and Performance Test of Hydraulic Intensifier

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyoung Eui; Lee, Gi Chun [Korea Institute of Machinery and Materials, Daejeon (Korea, Republic of); Kim, Jae Hoon [Chungnam National University, Daejeon (Korea, Republic of)

    2010-07-15

    Components such as pressure vessel, hydraulic hose assembly, accumulator, hydraulic cylinder, hydraulic valve, pipe, etc., are tested under the impulse-pressure conditions prescribed in ISO and SAE standards. The impulse pressure test machine needs to have a high pressure, a precise control system and a long life. It should satisfy the requirements for fabrication of the impulse tester to generate ultra high pressure in the hydraulic system. In the impulse tester, a servo-valve control system is adopted; although the control application is convenient, it is expensive owing to the cost of developing the system. The type of the control system determines the pressure wave, which affects the components that are tested. In this study, the manufacturing process and the intensifier system design related to the flow, pressure, and the increasing rate of pressure are investigated. The results indicate the ultra high pressure waves in the system.

  4. The LISA Pathfinder interferometry-hardware and system testing

    Energy Technology Data Exchange (ETDEWEB)

    Audley, H; Danzmann, K; MarIn, A Garcia; Heinzel, G; Monsky, A; Nofrarias, M; Steier, F; Bogenstahl, J [Albert-Einstein-Institut, Max-Planck-Institut fuer Gravitationsphysik und Universitaet Hannover, 30167 Hannover (Germany); Gerardi, D; Gerndt, R; Hechenblaikner, G; Johann, U; Luetzow-Wentzky, P; Wand, V [EADS Astrium GmbH, Friedrichshafen (Germany); Antonucci, F [Dipartimento di Fisica, Universita di Trento and INFN, Gruppo Collegato di Trento, 38050 Povo, Trento (Italy); Armano, M [European Space Astronomy Centre, European Space Agency, Villanueva de la Canada, 28692 Madrid (Spain); Auger, G; Binetruy, P [APC UMR7164, Universite Paris Diderot, Paris (France); Benedetti, M [Dipartimento di Ingegneria dei Materiali e Tecnologie Industriali, Universita di Trento and INFN, Gruppo Collegato di Trento, Mesiano, Trento (Italy); Boatella, C, E-mail: antonio.garcia@aei.mpg.de [CNES, DCT/AQ/EC, 18 Avenue Edouard Belin, 31401 Toulouse, Cedex 9 (France)

    2011-05-07

    Preparations for the LISA Pathfinder mission have reached an exciting stage. Tests of the engineering model (EM) of the optical metrology system have recently been completed at the Albert Einstein Institute, Hannover, and flight model tests are now underway. Significantly, they represent the first complete integration and testing of the space-qualified hardware and are the first tests on an optical system level. The results and test procedures of these campaigns will be utilized directly in the ground-based flight hardware tests, and subsequently during in-flight operations. In addition, they allow valuable testing of the data analysis methods using the MATLAB-based LTP data analysis toolbox. This paper presents an overview of the results from the EM test campaign that was successfully completed in December 2009.

  5. Air pollution control system testing at the DOE offgas components test facility

    International Nuclear Information System (INIS)

    Burns, D.B.; Speed, D.; VanPelt, W.; Burns, H.H.

    1997-01-01

    In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Consolidated Incineration Facility (CIF) to treat solid and liquid RCRA hazardous and mixed wastes. The Savannah River Technology Center (SRTC) leads an extensive technical support program designed to obtain incinerator and air pollution control equipment performance data to support facility start-up and operation. A key component of this technical support program includes the Offgas Components Test Facility (OCTF), a pilot-scale offgas system test bed. The primary goal for this test facility is to demonstrate and evaluate the performance of the planned CIF Air Pollution Control System (APCS). To accomplish this task, the OCTF has been equipped with a 1/10 scale CIF offgas system equipment components and instrumentation. In addition, the OCTF design maximizes the flexibility of APCS operation and facility instrumentation and sampling capabilities permit accurate characterization of all process streams throughout the facility. This allows APCS equipment performance to be evaluated in an integrated system under a wide range of possible operating conditions. This paper summarizes the use of this DOE test facility to successfully demonstrate APCS operability and maintainability, evaluate and optimize equipment and instrument performance, and provide direct CIF start-up support. These types of facilities are needed to permit resolution of technical issues associated with design and operation of systems that treat and dispose combustible hazardous, mixed, and low-level radioactive waste throughout and DOE complex

  6. SIMS prototype system 1 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.

  7. Test of user- and system programs coded in real time languages - requirements on program language and testing tool

    International Nuclear Information System (INIS)

    Hertlin, J.; Mackert, M.

    1979-01-01

    In the present paper the functions are presented, which should be part of a test system for user programs in a higher treat time programming language, taking into account time sequences and competitive processes. As can be shown by the problem of testing, use of higher level real time programming languages renders the task of program development essentially easier, however performance of test procedures without appropriate test systems is very difficult. After the presentation of notions and methods for the testing of programs, general requirements on testing tools are described and the test system functions for a program test, beeing uncritical with respect to time, are placed together. Thereby, for every individual function, the interface between the test system, the program under test, and the residual program-generation system (compiler, binder, operating system, delay-time system, and loader) is given too. For the time-critical test, a series of desirable functions are described, which can be implemented with acceptable expense. (orig.) [de

  8. A LabVIEWTM-based detector testing system

    International Nuclear Information System (INIS)

    Yang Haori; Li Yuanjing; Wang Yi; Li Yulan; Li Jin

    2003-01-01

    The construction of a LabVIEW-based detector testing system is described in this paper. In this system, the signal of detector is magnified and digitized, so amplitude or time spectrum can be obtained. The Analog-to-Digital Converter is a peak-sensitive ADC based on VME bus. The virtual instrument constructed by LabVIEW can be used to acquire data, draw spectrum and save testing results

  9. 21 CFR 862.1810 - Vitamin B12 test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vitamin B12 test system. 862.1810 Section 862.1810....1810 Vitamin B12 test system. (a) Identification. A vitamin B12 test system is a device intended to measure vitamin B12 in serum, plasma, and urine. Measurements obtained by this device are used in the...

  10. Integrated Automatic Test System for Airborne Optoelectronic Pods

    International Nuclear Information System (INIS)

    Zhang, Z M; Ding, M J; Wang, L

    2006-01-01

    Based on the introduction of the construction and basic principle of the airborne optoelectronic pod, in accordance with the performance standards of the pod, the total solution scheme of the automatic test system used for testing the combination property is proposed in this paper. The main structure, hardware and software design of the system based on the virtual instruments technology are also discussed in detail. The result of the true run proves the practicality, efficiency, high accuracy and other characteristics of the computer aided testing system based on virtual instruments

  11. DOE LeRC photovoltaic systems test facility

    Science.gov (United States)

    Cull, R. C.; Forestieri, A. F.

    1978-01-01

    The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.

  12. A novel energy regeneration system for emulsion pump tests

    Energy Technology Data Exchange (ETDEWEB)

    Yilei, Li; Zhencai, Zhu; Guohua, Cao [China University of Mining and Technology, Xuzhou (China); Guoan, Chen [Command Academy of the Corps of Engineers, Xuzhou (China)

    2013-04-15

    A novel energy regeneration system based on cylinders and a rectifier valve for emulsion pump tests is presented and studied. The overall structure and working principles of this system are introduced. Both simulation and experiments are carried out to investigate the energy regeneration feasibility and capability of this novel system. The simulation and experimental results validate that this system is able to save energy and satisfy the test requirement. The energy recovery coefficient and overall energy regeneration coefficient of the test bench are 0.785 and 0.214, respectively. Measures to improve these two coefficients are also given accordingly after analysis of power loss. This novel system brings a new method of energy regeneration for emulsion pump tests.

  13. Test-based approach to cable tray support system analysis and design: Behavior and test methods

    Energy Technology Data Exchange (ETDEWEB)

    Reigles, Damon G., E-mail: dreigles@engnovex.com [engNoveX, Inc., 19C Trolley Square, Wilmington, DE 19806 (United States); Brachmann, Ingo; Johnson, William H. [Bechtel Nuclear, Security & Environmental, 12011 Sunset Hills Rd, Suite 110, Reston, VA 20190 (United States); Gürbüz, Orhan [Tobolski Watkins Engineering, Inc., 4125 Sorrento Valley Blvd, Suite B, San Diego, CA 92121 (United States)

    2016-06-15

    Highlights: • Describes dynamic response behavior of unistrut type cable tray supports. • Summarizes observations from past full-scale shake table test programs. • Outlines testing methodologies necessary to identify key system parameters. - Abstract: Nuclear power plant safety-related cable tray support systems subjected to seismic loadings were originally understood and designed to behave as linear elastic systems. This behavioral paradigm persisted until the early 1980s when, due to evolution of regulatory criteria, some as-installed systems needed to be qualified to higher seismic motions than originally designed for. This requirement prompted a more in-depth consideration of the true seismic response behavior of support systems. Several utilities initiated extensive test programs, which demonstrated that trapeze strut-type cable tray support systems exhibited inelastic and nonlinear response behaviors with plastic hinging at the connections together with high damping due to bouncing of cables in the trays. These observations were used to demonstrate and justify the seismic adequacy of the aforementioned as-installed systems. However, no formalized design methodology or criteria were ever established to facilitate use of these test data for future evaluations. This paper assimilates and reviews the various test data and conclusions for the purpose of developing a design methodology for the seismic qualification of safety-related cable tray support systems.

  14. A Portable Environment Test System: A Field Assessment of Organotin Leachates--Test and Evaluation.

    Science.gov (United States)

    1987-11-01

    of organotin-based antifouling (AF) coatings, NOSC researchers used this facility to study the effects of tributyltin ( TBT ), the primary toxic ...Environmental Test System (PETS) was evaluated with tributyltin ( TBT ) anti oling leachates in Sin Diego Bay over a 7-month period. Overall mean test...EXECUTIVE SUMMARY A Portable Environmental Test System (PETS) was evaluated with tributyltin ( TBT ) antifouling leachates in San Diego Bay for 7

  15. Acceptance Test Report for 241-U compressed air system

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027

  16. Safety Test Report for the SNF Dry Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Bang, K. S.; Seo, K. S.; Lee, J. H.; Lee, J. C.; Choi, W. S

    2008-11-15

    This is technical report conducted by KAERI under the contract with NETEC for safety test for the PWR S/F dry storage system. Leak Test was performed after drop test and turn-over test, the measured leakage rate was lower than allowable leakage rate. It is revealed that the containment integrity of the dry storage system is maintained. In the seismic test, the moving of the model was measured at SRTH seismic response of 0.4 g and 0.8 g. Therefore the seismic test results can be used fully to the test data for verification of the seismic analysis. In the thermal test, the direction of the inlet and outlet of the air has no effect on the heat transfer performance. The passive heat removal system of the horizontal storage module was designed well.

  17. Diagnosis - Using automatic test equipment and artificial intelligence expert systems

    Science.gov (United States)

    Ramsey, J. E., Jr.

    Three expert systems (ATEOPS, ATEFEXPERS, and ATEFATLAS), which were created to direct automatic test equipment (ATE), are reviewed. The purpose of the project was to develop an expert system to troubleshoot the converter-programmer power supply card for the F-15 aircraft and have that expert system direct the automatic test equipment. Each expert system uses a different knowledge base or inference engine, basing the testing on the circuit schematic, test requirements document, or ATLAS code. Implementing generalized modules allows the expert systems to be used for any different unit under test. Using converted ATLAS to LISP code allows the expert system to direct any ATE using ATLAS. The constraint propagated frame system allows for the expansion of control by creating the ATLAS code, checking the code for good software engineering techniques, directing the ATE, and changing the test sequence as needed (planning).

  18. Test-Driven, Model-Based Systems Engineering

    DEFF Research Database (Denmark)

    Munck, Allan

    Hearing systems have evolved over many years from simple mechanical devices (horns) to electronic units consisting of microphones, amplifiers, analog filters, loudspeakers, batteries, etc. Digital signal processors replaced analog filters to provide better performance end new features. Central....... This thesis concerns methods for identifying, selecting and implementing tools for various aspects of model-based systems engineering. A comprehensive method was proposed that include several novel steps such as techniques for analyzing the gap between requirements and tool capabilities. The method...... was verified with good results in two case studies for selection of a traceability tool (single-tool scenario) and a set of modeling tools (multi-tool scenarios). Models must be subjected to testing to allow engineers to predict functionality and performance of systems. Test-first strategies are known...

  19. Resistance to antimicrobial agents among Salmonella isolates recovered from layer farms and eggs in the Caribbean region.

    Science.gov (United States)

    Adesiyun, Abiodun; Webb, Lloyd; Musai, Lisa; Louison, Bowen; Joseph, George; Stewart-Johnson, Alva; Samlal, Sannandan; Rodrigo, Shelly

    2014-12-01

    This investigation determined the frequency of resistance of 84 isolates of Salmonella comprising 14 serotypes recovered from layer farms in three Caribbean countries (Trinidad and Tobago, Grenada, and St. Lucia) to eight antimicrobial agents, using the disc diffusion method. Resistance among isolates of Salmonella was related to the country of recovery, type of sample, size of layer farms, and isolate serotype. Overall, all (100.0%) of the isolates exhibited resistance to one or more of seven antimicrobial agents tested, and all were susceptible to chloramphenicol. The resistance detected ranged from 11.9% to sulphamethoxazole-trimethoprim (SXT) to 100.0% to erythromycin. The difference was, however, not statistically significant (P = 0.23). Across countries, for types of samples that yielded Salmonella, significant differences in frequency of resistance were detected only to SXT (P = 0.002) in Trinidad and Tobago and to gentamycin (P = 0.027) in St. Lucia. For the three countries, the frequency of resistance to antimicrobial agents was significantly different for ampicillin (P = 0.001) and SXT (P = 0.032). A total of 83 (98.8%) of the 84 isolates exhibited 39 multidrug resistance patterns. Farm size significantly (P = 0.032) affected the frequency of resistance to kanamycin across the countries. Overall, among the 14 serotypes of Salmonella tested, significant (P resistance were detected to kanamycin, ampicillin, and SXT. Results suggest that the relatively high frequency of resistance to six of the antimicrobial agents (erythromycin, streptomycin, gentamycin, kanamycin, ampicillin, and tetracycline) tested and the multidrug resistance detected may pose prophylactic and therapeutic concerns for chicken layer farms in the three countries studied.

  20. INFORMATION-MEASURING TEST SYSTEM OF DIESEL LOCOMOTIVE HYDRAULIC TRANSMISSIONS

    Directory of Open Access Journals (Sweden)

    I. V. Zhukovytskyy

    2015-08-01

    Full Text Available Purpose. The article describes the process of developing the information-measuring test system of diesel locomotives hydraulic transmission, which gives the possibility to obtain baseline data to conduct further studies for the determination of the technical condition of diesel locomotives hydraulic transmission. The improvement of factory technology of post-repair tests of hydraulic transmissions by automating the existing hydraulic transmission test stands according to the specifications of the diesel locomotive repair enterprises was analyzed. It is achieved based on a detailed review of existing foreign information-measuring test systems for hydraulic transmission of diesel locomotives, BelAZ earthmover, aircraft tug, slag car, truck, BelAZ wheel dozer, some brands of tractors, etc. The problem for creation the information-measuring test systems for diesel locomotive hydraulic transmission is being solved, starting in the first place from the possibility of automation of the existing test stand of diesel locomotives hydraulic transmission at Dnipropetrovsk Diesel Locomotive Repair Plant "Promteplovoz". Methodology. In the work the researchers proposed the method to create a microprocessor automated system of diesel locomotives hydraulic transmission stand testing in the locomotive plant conditions. It acts by justifying the selection of the necessary sensors, as well as the application of the necessary hardware and software for information-measuring systems. Findings. Based on the conducted analysis there was grounded the necessity of improvement the plant hydraulic transmission stand testing by creating a microprocessor testing system, supported by the experience of developing such systems abroad. Further research should be aimed to improve the accuracy and frequency of data collection by adopting the more modern and reliable sensors in tandem with the use of filtering software for electromagnetic and other interference. Originality. The

  1. 16 CFR 1203.16 - Dynamic strength of retention system test.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Dynamic strength of retention system test.... (2) The retention system strength test equipment shall consist of a dynamic impact apparatus that... stirrup. (2) Mark the pre-test position of the retention system, with the entire dynamic test apparatus...

  2. High efficiency generalized transduction in Escherichia coli O157:H7 [v1; ref status: indexed, http://f1000r.es/8f

    Directory of Open Access Journals (Sweden)

    Martin G Marinus

    2013-01-01

    Full Text Available Genetic manipulation in enterohemorrhagic E. coli O157:H7 is currently restricted to recombineering, a method that utilizes the recombination system of bacteriophage lambda, to introduce gene replacements and base changes inter alia into the genome. Bacteriophage 933W is a prophage in E. coli O157:H7 strain EDL933, which encodes the genes (stx2AB for the production of Shiga toxin which is the basis for the potentially fatal Hemolytic Uremic Syndrome in infected humans. We replaced the stx2AB genes with a kanamycin cassette using recombineering. After induction of the prophage by ultra-violet light, we found that bacteriophage lysates were capable of transducing to wildtype, point mutations in the lactose, arabinose and maltose genes. The lysates could also transduce tetracycline resistant cassettes. Bacteriophage 933W is also efficient at transducing markers in E. coli K-12. Co-transduction experiments indicated that the maximal amount of transferred DNA was likely the size of the bacteriophage genome, 61 kB. All tested transductants, in both E. coli K-12 and O157:H7, were kanamycin-sensitive indicating that the transducing particles contained host DNA.

  3. Vehicle brake testing system

    Science.gov (United States)

    Stevens, Samuel S [Harriman, TN; Hodgson, Jeffrey W [Lenoir City, TN

    2002-11-19

    This invention relates to a force measuring system capable of measuring forces associated with vehicle braking and of evaluating braking performance. The disclosure concerns an invention which comprises a first row of linearly aligned plates, a force bearing surface extending beneath and beside the plates, vertically oriented links and horizontally oriented links connecting each plate to a force bearing surface, a force measuring device in each link, a transducer coupled to each force measuring device, and a computing device coupled to receive an output signal from the transducer indicative of measured force in each force measuring device. The present invention may be used for testing vehicle brake systems.

  4. Railcar waste transfer system hydrostatic test

    International Nuclear Information System (INIS)

    Ellingson, S.D.

    1997-01-01

    Recent modifications have been performed on the T-Plant Railcar Waste Transfer System, This Acceptance Test Procedure (ATP) has been prepared to demonstrate that identified piping welds and mechanical connections incorporated during the modification are of high integrity and are acceptable for service. This will be achieved by implementation of a hydrostatic leak test

  5. Tank waste remediation system high-level waste vitrification system development and testing requirements

    International Nuclear Information System (INIS)

    Calmus, R.B.

    1995-01-01

    This document provides the fiscal year (FY) 1995 recommended high-level waste melter system development and testing (D and T) requirements. The first phase of melter system testing (FY 1995) will focus on the feasibility of high-temperature operation of recommended high-level waste melter systems. These test requirements will be used to establish the basis for defining detailed testing work scope, cost, and schedules. This document includes a brief summary of the recommended technologies and technical issues associated with each technology. In addition, this document presents the key D and T activities and engineering evaluations to be performed for a particular technology or general melter system support feature. The strategy for testing in Phase 1 (FY 1995) is to pursue testing of the recommended high-temperature technologies, namely the high-temperature, ceramic-lined, joule-heated melter, referred to as the HTCM, and the high-frequency, cold-wall, induction-heated melter, referred to as the cold-crucible melter (CCM). This document provides a detailed description of the FY 1995 D and T needs and requirements relative to each of the high-temperature technologies

  6. Test system to simulate transient overpower LMFBR cladding failure

    International Nuclear Information System (INIS)

    Barrus, H.G.; Feigenbutz, L.V.

    1981-01-01

    One of the HEDL programs has the objective to experimentally characterize fuel pin cladding failure due to cladding rupture or ripping. A new test system has been developed which simulates a transient mechanically-loaded fuel pin failure. In this new system the mechanical load is prototypic of a fuel pellet rapidly expanding against the cladding due to various causes such as fuel thermal expansion, fuel melting, and fuel swelling. This new test system is called the Fuel Cladding Mechanical Interaction Mandrel Loading Test (FCMI/MLT). The FCMI/MLT test system and the method used to rupture cladding specimens very rapidly to simulate a transient event are described. Also described is the automatic data acquisition and control system which is required to control the startup, operation and shutdown of the very fast tests, and needed to acquire and store large quantities of data in a short time

  7. Results from the STAR TPC system test

    International Nuclear Information System (INIS)

    Betts, W.

    1996-01-01

    A system test of various components of the Solenoidal Tracker at RHIC (STAR) detector, operating in concern, has recently come on-line. Communication between a major sub-detector, a sector of the Time Projection Chamber (TPC), and the trigger, data acquisition and slow controls systems has been established, enabling data from cosmic ray muons to be collected. First results from an analysis of the TPC data are presented. These include measurements of system noise, electronic parameters such as amplifier gains and pedestal values, and tracking resolution for cosmic ray muons and laser induced ionization tracks. A discussion on the experience gained in integrating the different components for the system test is also given

  8. Phase 1 space fission propulsion system testing and development progress

    International Nuclear Information System (INIS)

    Van Dyke, Melissa; Houts, Mike; Godfroy, Tom; Dickens, Ricky; Poston, David; Kapernick, Rick; Reid, Bob; Salvail, Pat; Ring, Peter

    2002-01-01

    Successful development of space fission systems requires an extensive program of affordable and realistic testing. In addition to tests related to design/development of the fission system, realistic testing of the actual flight unit must also be performed. If the system is designed to operate within established radiation damage and fuel burn up limits while simultaneously being designed to allow close simulation of heat from fission using resistance heaters, high confidence in fission system performance and lifetime can be attained through a series of non-nuclear tests. The Safe Affordable Fission Engine (SAFE) test series, whose ultimate goal is the demonstration of a 300 kW flight configuration system, has demonstrated that realistic testing can be performed using non-nuclear methods. This test series, carried out in collaboration with other NASA centers, other government agencies, industry, and universities, successfully completed a testing program with a 30 kWt core. Stirling engine, and ion engine configuration. Additionally, a 100 kWt core is in fabrication and appropriate test facilities are being reconfigured. This paper describes the current SAFE non-nuclear tests, which includes test article descriptions, test results and conclusions, and future test plans

  9. Test tube systems with cutting/recombination operations

    Energy Technology Data Exchange (ETDEWEB)

    Freund, R. [Technische Universitaet Wien (Austria); Csuhaj-Varju, E. [Computer and Automation Institute, Budapest (Hungary); Wachtler, F. [Universitaet Wien (Austria)

    1996-12-31

    We introduce test tube systems based on operations that are closely related to the splicing operations, i.e. we consider the operations of cutting a string at a specific site into two pieces with marking them at the cut ends and of recombining two strings with specifically marked endings. Whereas in the splicing of two strings these strings are cut at specific sites and the cut pieces are recombined immediately in a crosswise way, in CR(cutting/recombination)-schemes cutting can happen independently from recombining the cut pieces. Test tube systems based on these operations of cutting and recombination turn out to have maximal generative power even if only very restricted types of input filters for the test tubes are used for the redistribution of the contents of the test tubes after a period of cuttings and recombinations in the test tubes. 10 refs.

  10. Thermionic system evaluated test (TSET) facility description

    Science.gov (United States)

    Fairchild, Jerry F.; Koonmen, James P.; Thome, Frank V.

    1992-01-01

    A consortium of US agencies are involved in the Thermionic System Evaluation Test (TSET) which is being supported by the Strategic Defense Initiative Organization (SDIO). The project is a ground test of an unfueled Soviet TOPAZ-II in-core thermionic space reactor powered by electrical heat. It is part of the United States' national thermionic space nuclear power program. It will be tested in Albuquerque, New Mexico at the New Mexico Engineering Research Institute complex by the Phillips Laboratoty, Sandia National Laboratories, Los Alamos National Laboratory, and the University of New Mexico. One of TSET's many objectives is to demonstrate that the US can operate and test a complete space nuclear power system, in the electrical heater configuration, at a low cost. Great efforts have been made to help reduce facility costs during the first phase of this project. These costs include structural, mechanical, and electrical modifications to the existing facility as well as the installation of additional emergency systems to mitigate the effects of utility power losses and alkali metal fires.

  11. 242A Distributed Control System Year 2000 Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  12. 242A Distributed Control System Year 2000 Acceptance Test Report

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3(trademark) (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each

  13. System engineering approach in the EU Test Blanket Systems Design Integration

    International Nuclear Information System (INIS)

    Panayotov, D.; Sardain, P.; Boccaccini, L.V.; Salavy, J.-F.; Cismondi, F.; Jourd'Heuil, L.

    2011-01-01

    The complexity of the Test Blanket Systems demands diverse and comprehensive integration activities. Test Blanket Modules - Consortia of Associates (TBM-CA) applies the system engineering methods in all stages of the Test Blanket System (TBS) design integration. Completed so far integration engineering tasks cover among others status and initial set of TBS operating parameters; list of codes, standards and regulations related to TBS; planning of the TBS interfaces and baseline documentation. Most of the attention is devoted to the establishment the Helium-Cooled Lithium Lead (HCLL) and Helium-Cooled Pebble Bed Lead (HCPB) TBS configuration baseline, TBS break down into sub-systems, identification, definition and management of the internal and external interfaces, development of the TBS plant break down structure (PBS), establishment and management of the required TBS baseline documentation infrastructure. Break down of the TBS into sub-systems that is crucial for the further design and interfaces' management has been selected considering several options and using specific evaluation criteria. Process of the TBS interfaces management covers the planning, definition and description, verification and review, non-conformances and deviations, and modification and improvement processes. Process of interfaces review is developed, identifying the actors, input, activities and output of the review. Finally the relations and interactions of system engineering processes with TBM configuration management and TBM-CA Quality Management System are discussed.

  14. Procurement specification high vacuum test chamber and pumping system

    International Nuclear Information System (INIS)

    1976-01-01

    The specification establishes requirements for a high-vacuum test chamber, associated vacuum pumps, valves, controls, and instrumentation that shall be designed and fabricated for use as a test chamber for testing a closed loop Brayton Isotope Power System (BIPS) Ground Demonstration System (GDS). The vacuum system shall include all instrumentation required for pressure measurement and control of the vacuum pumping system. A general outline of the BIPS-GDS in the vacuum chamber and the preliminary piping and instrumentation interface to the vacuum chamber are shown

  15. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  16. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    BARNES, D.A.

    2000-01-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  17. Rocket Testing and Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John

    2005-01-01

    Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

  18. Standardization of penetrating radiation testing system

    International Nuclear Information System (INIS)

    Wiley, P.A.; Aronson, H.L.

    1979-01-01

    Standardization is provided to control system gain of a penetrating radiation testing system by periodically inspecting a reference object in the same manner as the product samples so as to generate a stabilization signal which is compared to a reference signal. The difference, if any, between the stabilization signal and the reference signal is integrated and the integrated signal is used to correct the gain of the system

  19. 21 CFR 862.1205 - Cortisol (hydrocortisone and hydroxycorticosterone) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cortisol (hydrocortisone and hydroxycorticosterone... Clinical Chemistry Test Systems § 862.1205 Cortisol (hydrocortisone and hydroxycorticosterone) test system. (a) Identification. A cortisol (hydrocortisone and hydroxycorticosterone) test system is a device...

  20. Results of KEPCO HTS cable system tests and design of hybrid cryogenic system

    International Nuclear Information System (INIS)

    Lim, J.H.; Sohn, S.H.; Yang, H.S.; Hwang, S.D.; Kim, D.L.; Ryoo, H.S.; Choi, H.O.

    2010-01-01

    In order to investigate the compatibility as a power utility facility, Korea Electric Power Corporation (KEPCO) had installed a 22.9 kV, 1250 A, 100 m long high temperature superconducting (HTS) power cable system. Using the HTS cable, various tests have been performed to investigate electrical and thermo-mechanical properties. Since 2005, a series of thermal cycle tests between liquid nitrogen (LN 2 ) and ambient temperatures have been conducted using a vacuum-pump driven open-loop cryogenic system with a capacity of 3 kW. In the tests, although the open-loop cryogenic system was reliable to operate the HTS cable system, it was not effective in economic view point because LN 2 consumption was larger than expected. In order to secure against unexpected emergencies and solve the problem of LN 2 consumption, a hybrid cryogenic system was designed and installed. A stirling cryocooler was employed and combined with the open-loop cryogenic system. Considering the average heat load at rated condition, the cooling capacity of the cryocooler was determined to 4 kW at 77 K. In this paper, results of performance tests and the design of the hybrid cooling system are presented.

  1. 21 CFR 862.1110 - Bilirubin (total or direct) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Bilirubin (total or direct) test system. 862.1110... Systems § 862.1110 Bilirubin (total or direct) test system. (a) Identification. A bilirubin (total or direct) test system is a device intended to measure the levels of bilirubin (total or direct) in plasma...

  2. Space Telecommunications Radio System (STRS) Compliance Testing

    Science.gov (United States)

    Handler, Louis M.

    2011-01-01

    The Space Telecommunications Radio System (STRS) defines an open architecture for software defined radios. This document describes the testing methodology to aid in determining the degree of compliance to the STRS architecture. Non-compliances are reported to the software and hardware developers as well as the NASA project manager so that any non-compliances may be fixed or waivers issued. Since the software developers may be divided into those that provide the operating environment including the operating system and STRS infrastructure (OE) and those that supply the waveform applications, the tests are divided accordingly. The static tests are also divided by the availability of an automated tool that determines whether the source code and configuration files contain the appropriate items. Thus, there are six separate step-by-step test procedures described as well as the corresponding requirements that they test. The six types of STRS compliance tests are: STRS application automated testing, STRS infrastructure automated testing, STRS infrastructure testing by compiling WFCCN with the infrastructure, STRS configuration file testing, STRS application manual code testing, and STRS infrastructure manual code testing. Examples of the input and output of the scripts are shown in the appendices as well as more specific information about what to configure and test in WFCCN for non-compliance. In addition, each STRS requirement is listed and the type of testing briefly described. Attached is also a set of guidelines on what to look for in addition to the requirements to aid in the document review process.

  3. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 1 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). This acceptance test consisted of a pressure-decay/leak test of the containment bag to verify that the seams along the length of the bag had been adequately sealed. The sealing integrity of the FRS must be verified to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at Lancs Industries in Kirkland, Washington on January 17, 1995. The bag temperature-compensated pressure loss of 575 Pa was below the acceptance criteria of 625 Pa and the test results were therefore found to be acceptable. The bag manufacturer estimates that 80--90% of the pressure loss is attributed to leakage around the bag inflation valve where the pressure gage was connected. A leak detector was applied over the entire bag during the pre-tests and no leakage was found. Furthermore, the leak rate corresponding to this pressure loss is very small when compared to the acceptable leak rate of the completely assembled FRS. The sealing integrity of the assembled FRS is verified in Phase 3 testing

  4. Cell-Phone Tower Power System Prototype Testing for Verizon Wireless |

    Science.gov (United States)

    Advanced Manufacturing Research | NREL Cell-Phone Tower Power System Prototype Testing for Verizon Wireless Cell-Phone Tower Power System Prototype Testing for Verizon Wireless For Verizon Wireless , NREL tested a new cell-phone tower power system prototype based on DC interconnection and photovoltaics

  5. Development of automatic ultrasonic testing system and its application

    International Nuclear Information System (INIS)

    Oh, Sang Hong; Matsuura, Toshihiko; Iwata, Ryusuke; Nakagawa, Michio; Horikawa, Kohsuke; Kim, You Chul

    1997-01-01

    The radiographic testing (RT) has been usually applied to a nondestructive testing, which is carried out on purpose to detect internal defects at welded joints of a penstock. In the case that RT could not be applied to, the ultrasonic testing (UT) was performed. UT was generally carried out by manual scanning and the inspections data were recorded by the inspector in a site. So, as a weak point, there was no objective inspection records correspond to films of RT. It was expected that the automatic ultrasonic testing system by which automatic scanning and automatic recording are possible was developed. In this respect, the automatic ultrasonic testing system was developed. Using newly developed the automatic ultrasonic testing system, test results to the circumferential welded joints of the penstock at a site were shown in this paper.

  6. Isolation and Antibiotic Sensitivity of Bacillus thuringinesis Strain From Dump Soil

    Directory of Open Access Journals (Sweden)

    Sarker, D.

    2010-01-01

    Full Text Available Bacillus thuringiensis (or Bt is a commonly used as a pesticide. B. thuringiensis is a naturally-occurring soil bacterium, also occurs naturally in the gut of caterpillars of various types of moths and butterflies, as well as on the dark surface of plants. The xylanase producing bacterial strains were isolated from dump soil. The strains were isolated on xylan agar media and screening was carried out by xylanolysis method. To test the sensitivity of the isolates, ten different antibiotics were used. The strains were tested for resistance to doxycyclin, erythromycin, chloramphenical, cephallaxin, kanamycin, ampicillin, steptomycin, vancomycin, amoxycillin and neomycin. The strains showed sensitive to doxycyclin, erythromycin, chloramphenical, cephallaxin, kanamycin, ampicillin, steptomycin and vancomycin and also showed resistance to amoxycillin and neomycin, when tested by disc diffusion method on nutrient agar plate confirmed by antibiotic spread plate method. The inhibitory effect of B. thuringiensis strains against the test bacteria Bacillus subtilis, Sarcina lutca, Shigella dysenteriae, Shigella sonnei and Pseudomonus aeruginosa examined. It was found that, B. thuringiensis S1, B. thuringiensis S2 and B. thuringiensis S3 strains showed an inhibitory effect on all of the test bacteria.

  7. PHASE II VAULT TESTING OF THE ARGONNE RFID SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-06-25

    The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step

  8. Phase II Vault Testing of the Argonne RFID System

    International Nuclear Information System (INIS)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-01-01

    The U.S. Department of Energy (DOE) (Environmental Management (EM), Office of Packaging and Transportation (EM-45)) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase

  9. Gas recovery and self-testing systm in gasoline stations. Execution of practical field tests / phase of tests in the wholistic system; Gasrueckfuehrung und selbstueberwachende Systeme an Tankstellen. Durchfuehrung von praktischen Feldtests/Testphase im ganzheitlichen System

    Energy Technology Data Exchange (ETDEWEB)

    Altmann, B.R.; Kunter, S.; Maurer, C.; Schneider, T.; Schrittenlacher, W.; Maahsen, H.; Arts, M.

    2003-04-01

    The amendment of the 21{sup st} Regulation on Air-Pollution Control dated 17.05.2002 describes continuous control of the function of gas recovery systems in gasoline stations by automatic control systems. Both systems available in the market (supplied by FAFNIR and TOKHEIM) were tested in extensive field tests. Both systems are ready for mass production. New dispensers are delivered with self control systems per production-type since 1.04.2003. Supplementary kits for the different dispenser types are available. (orig.)

  10. Testing Challenges of Maritime Safety and Security Systems-of-Systems

    NARCIS (Netherlands)

    Gonzalez, A.; Piel, E.; Gross, H.G.

    2008-01-01

    Preprint of paper published in: TAIC PART 2008: Testing: Academic & Industrial Conference, Practice and Research Techniques, 29-31 August 2008; doi:10.1109/TAIC-PART.2008.14 Maritime Safety and Security systems represent a novel kind of large-scale distributed component-based systems in which the

  11. Computer-based test system for the Tactical Airfield Attack Munition (TAAM) safing, arming, and fuzing system

    International Nuclear Information System (INIS)

    Warhus, J.; Castleton, R.; Lanning, S.

    1981-12-01

    Testing and quality assurance of large numbers of firing systems are an essential part of the development of the Tactical Airfield Attack Munition (TAAM). A computerized test and data acquisition system has been developed to make the testing and quality assurance workload manageable. The system hardware utilizes an LSI-11/23 computer, a Tektronix 7612 transient digitizer, and various other programmable instruments and power supplies. The system is capable of measuring and analyzing mechanical shock and fireset transient waveforms, automating testing sequences, and making records and comparisons of the test results. The system architecture is flexible for general purpose firing system development work

  12. A computer-controlled automated test system for fatigue and fracture testing

    International Nuclear Information System (INIS)

    Nanstad, R.K.; Alexander, D.J.; Swain, R.L.; Hutton, J.T.; Thomas, D.L.

    1989-01-01

    A computer-controlled system consisting of a servohydraulic test machine, an in-house designed test controller, and a desktop computer has been developed for performing automated fracture toughness and fatigue crack growth testing both in the laboratory and in hot cells for remote testing of irradiated specimens. Both unloading compliance and dc-potential drop can be used to monitor crack growth. The test controller includes a dc-current supply programmer, a function generator for driving the servohydraulic test machine to required test outputs, five measurement channels (each consisting of low-pass filter, track/hold amplifier, and 16-bit analog-to-digital converter), and digital logic for various control and data multiplexing functions. The test controller connects to the computer via a 16-bit wide photo-isolated bidirectional bus. The computer, a Hewlett-Packard series 200/300, inputs specimen and test parameters from the operator, configures the test controller, stores test data from the test controller in memory, does preliminary analysis during the test, and records sensor calibrations, specimen and test parameters, and test data on flexible diskette for later recall and analysis with measured initial and final crack length information. During the test, the operator can change test parameters as necessary. 24 refs., 6 figs

  13. Preparation of acceptance tests and criteria for the Test Blanket Systems to be operated in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Laan, J.G. van der, E-mail: JaapG.vanderLaan@iter.org [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Cuquel, B. [AIRBUS Defence and Space S.A.S., 13115 Saint Paul Lez Durance (France); Demange, D.; Ghidersa, B.-E. [Karlsruhe Institute of Technology, Karlsruhe (Germany); Giancarli, L.M.; Iseli, M.; Jourdan, T. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Nevière, J.-C. [Comex-Nucleaire, 13115 Saint Paul Lez Durance (France); Pascal, R.; Ring, W. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • Initial guideline for acceptance testing and acceptance criteria for Test Blanket Systems in ITER. • These tests complement those required by the applicable codes and standards, and regulations. • Completion of TBS manufacture will be followed by Factory Acceptance Testing, prior to shipment. • Next steps are “Reception Inspection Tests”, and on-site pre-installation and components tests. • This guideline allows the detailing of the TBS specific test plans and their scheduling. - Abstract: This paper describes the main acceptance criteria and required acceptance tests for the components of the six Test Blanket Systems to be installed and operated in ITER. It summarizes the guide-line toward the establishment of detailed test plans for the TBS, starting from the end-product at the ITER Members factories, and to generally define the type of tests that have to be performed on the ITER site after shipment, and/or prior to the systems final commissioning phase.

  14. Test Results for the Automated Rendezvous and Capture System

    Science.gov (United States)

    Cruzen, Craig; Dabney, Richard; Lomas, James

    1999-01-01

    The Automated Rendezvous and Capture (AR&C) system was designed and tested at NASA's Marshall Space Flight Center (MSFC) to demonstrate technologies and mission strategies for automated rendezvous and docking of spacecraft in Earth orbit, The system incorporates some of the latest innovations in Global Positioning, System space navigation, laser sensor technologies and automated mission sequencing algorithms. The system's initial design and integration was completed in 1998 and has undergone testing at MSFC. This paper describes the major components of the AR&C system and presents results from the official system tests performed in MSFC's Flight Robotics Laboratory with digital simulations and hardware in the loop tests. The results show that the AR&C system can safely and reliably perform automated rendezvous and docking missions in the absence of system failures with 100 percent success. When system failures are included, the system uses its automated collision avoidance maneuver logic to recover in a safe manner. The primary objective of the AR&C project is to prove that by designing a safe and robust automated system, mission operations cost can be reduced by decreasing the personnel required for mission design, preflight planning and training required for crewed rendezvous and docking missions.

  15. Honeywell Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  16. Optimisation of the test policy of stand-by systems

    International Nuclear Information System (INIS)

    Signoret, J.P.; Muron, O.; Cohen, G.

    1980-09-01

    In a nuclear power plant there are several systems which are on stand-by position as, for instance, safety systems. These stand-by systems have to be ready to start as soon as any situation for which they have be designed occurs. A test policy is then necessary in order to know the state of such a system and repair the possible failures. The tests are normally performed at regular intervals of time according to a scheduled sequence. We have already shown during the 'IIIeme Congres National de Fiabilite' held in Perros-Guirec in 1976 how it is possible in this case to find the optimum test interval leading to the best mean availability of the system. It is, in fact, possible, to improve that by considering that if the test interval is fixed 'a priori' this does not allow to take into account information we have on the system state every time [fr

  17. Ventilation System Effectiveness and Tested Indoor Air Quality Impacts

    Energy Technology Data Exchange (ETDEWEB)

    Rudd, Armin [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bergey, Daniel [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-02-01

    Ventilation system effectiveness testing was conducted at two unoccupied, single-family, detached lab homes at the University of Texas - Tyler. Five ventilation system tests were conducted with various whole-building ventilation systems. Multizone fan pressurization testing characterized building and zone enclosure leakage. PFT testing showed multizone air change rates and interzonal airflow. Cumulative particle counts for six particle sizes, and formaldehyde and other Top 20 VOC concentrations were measured in multiple zones. The testing showed that single-point exhaust ventilation was inferior as a whole-house ventilation strategy. It was inferior because the source of outside air was not direct from outside, the ventilation air was not distributed, and no provision existed for air filtration. Indoor air recirculation by a central air distribution system can help improve the exhaust ventilation system by way of air mixing and filtration. In contrast, the supply and balanced ventilation systems showed that there is a significant benefit to drawing outside air from a known outside location, and filtering and distributing that air. Compared to the Exhaust systems, the CFIS and ERV systems showed better ventilation air distribution and lower concentrations of particulates, formaldehyde and other VOCs. System improvement percentages were estimated based on four System Factor Categories: Balance, Distribution, Outside Air Source, and Recirculation Filtration. Recommended System Factors could be applied to reduce ventilation fan airflow rates relative to ASHRAE Standard 62.2 to save energy and reduce moisture control risk in humid climates. HVAC energy savings were predicted to be 8-10%, or $50-$75/year.

  18. Ventilation System Effectiveness and Tested Indoor Air Quality Impacts

    Energy Technology Data Exchange (ETDEWEB)

    Rudd, Armin [Building Science Corporation, Somerville, MA (United States); Bergey, Daniel [Building Science Corporation, Somerville, MA (United States)

    2014-02-01

    In this project, Building America research team Building Science Corporation tested the effectiveness of ventilation systems at two unoccupied, single-family, detached lab homes at the University of Texas - Tyler. Five ventilation system tests were conducted with various whole-building ventilation systems. Multizone fan pressurization testing characterized building and zone enclosure leakage. PFT testing showed multizone air change rates and interzonal airflow. Cumulative particle counts for six particle sizes, and formaldehyde and other Top 20 VOC concentrations were measured in multiple zones. The testing showed that single-point exhaust ventilation was inferior as a whole-house ventilation strategy. This was because the source of outside air was not direct from outside, the ventilation air was not distributed, and no provision existed for air filtration. Indoor air recirculation by a central air distribution system can help improve the exhaust ventilation system by way of air mixing and filtration. In contrast, the supply and balanced ventilation systems showed that there is a significant benefit to drawing outside air from a known outside location, and filtering and distributing that air. Compared to the exhaust systems, the CFIS and ERV systems showed better ventilation air distribution and lower concentrations of particulates, formaldehyde and other VOCs. System improvement percentages were estimated based on four system factor categories: balance, distribution, outside air source, and recirculation filtration. Recommended system factors could be applied to reduce ventilation fan airflow rates relative to ASHRAE Standard 62.2 to save energy and reduce moisture control risk in humid climates. HVAC energy savings were predicted to be 8-10%, or $50-$75/year.

  19. The Regional Test Center Data Transfer System

    Energy Technology Data Exchange (ETDEWEB)

    Riley, Daniel M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Dept.; Stein, Joshua S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Dept.

    2016-09-01

    The Regional Test Centers are a group of several sites around the US for testing photovoltaic systems and components related to photovoltaic systems. The RTCs are managed by Sandia National Laboratories. The data collected by the RTCs must be transmitted to Sandia for storage, analysis, and reporting. This document describes the methods that transfer the data between remote sites and Sandia as well as data movement within Sandia’s network. The methods described are in force as of September, 2016.

  20. Design of online testing system of material radiation resistance

    International Nuclear Information System (INIS)

    Wan Junsheng; He Shengping; Gao Xinjun

    2014-01-01

    The capability of radiation resistance is important for some material used in some specifically engineering fields. It is the same principal applied in all existing test system that compares the performance parameter after radiation to evaluate material radiation resistance. A kind of new technique on test system of material radiation resistance is put forward in this paper. Experimentation shows that the online test system for material radiation resistance works well and has an extending application outlook. (authors)

  1. Test rig overview for validation and reliability testing of shutdown system software

    International Nuclear Information System (INIS)

    Zhao, M.; McDonald, A.; Dick, P.

    2007-01-01

    The test rig for Validation and Reliability Testing of shutdown system software has been upgraded from the AECL Windows-based test rig previously used for CANDU6 stations. It includes a Virtual Trip Computer, which is a software simulation of the functional specification of the trip computer, and a real-time trip computer simulator in a separate chassis, which is used during the preparation of trip computer test cases before the actual trip computers are available. This allows preparation work for Validation and Reliability Testing to be performed in advance of delivery of actual trip computers to maintain a project schedule. (author)

  2. The Madison Plan: A New Approach to System-Wide Testing. The Nucleus Testing Committee.

    Science.gov (United States)

    Cleary, T. Anne; Mathews, Walter M.

    Steps in the development of a Nucleus Testing Committee to assist in the development of a system-wide testing program in the Madison, Wisconsin, school system are described. Over 60 participants were selected for the committee, using the following selection guidelines: interest in the project and the role to be assumed, commitment to the school…

  3. Realization of automatic test system for induction motors

    Energy Technology Data Exchange (ETDEWEB)

    Adragna, R; Nuccio, S [Assessorato Regionale del Lavoro, Palermo (Italy). Centro Elaborazione Dati Palermo Univ. (Italy). Dip. di Ingegneria Elettrica

    1991-03-01

    In this paper, the general principles of the design of the hardware and software of an automatic test system, are outlined. With reference to the requirements of electric motor test laboratories, design principles, specific for such applications, are pointed out and an automatic test system for induction motors, developed at the Dipartimento di Ingegneria Elettrica of Palermo University, is described. The peculiarities of the hardware utilized and of the specific software developed are illustrated. Finally, some examples of applications are showed.

  4. Gas characterization system software acceptance test procedure

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  5. 21 CFR 862.1030 - Alanine amino transferase (ALT/SGPT) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Alanine amino transferase (ALT/SGPT) test system... Test Systems § 862.1030 Alanine amino transferase (ALT/SGPT) test system. (a) Identification. An alanine amino transferase (ALT/SGPT) test system is a device intended to measure the activity of the...

  6. 21 CFR 862.1390 - 5-Hydroxyindole acetic acid/serotonin test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false 5-Hydroxyindole acetic acid/serotonin test system... Test Systems § 862.1390 5-Hydroxyindole acetic acid/serotonin test system. (a) Identification. A 5-hydroxyindole acetic acid/serotonin test system is a device intended to measure 5-hydroxyindole acetic acid...

  7. Spent fuel test. Climax data acquisition system integration report

    International Nuclear Information System (INIS)

    Nyholm, R.A.; Brough, W.G.; Rector, N.L.

    1982-06-01

    The Spent Fuel Test - Climax (SFT-C) is a test of the retrievable, deep geologic storage of commercially generated, spent nuclear reactor fuel in granitic rock. Eleven spent fuel assemblies, together with 6 electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the Nevada Test Site. On June 2, 1978, Lawrence Livermore National Laboratory (LLNL) secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. This multi-year duration test is located in a remote area and is unattended much of the time. An extensive array of radiological safety and geotechnical instrumentation is deployed to monitor the test performance. A dual minicomputer-based data acquisition system collects and processes data from more than 900 analog instruments. This report documents the design and functions of the hardware and software elements of the Data Acquisition System and describes the supporting facilities which include environmental enclosures, heating/air-conditioning/humidity systems, power distribution systems, fire suppression systems, remote terminal stations, telephone/modem communications, and workshop areas. 9 figures

  8. Prototype Engineered Barrier System Field Test (PEBSFT)

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Buscheck, T.; Carlson, R.; Daily, W.; Lee, K.; Lin, Wunan; Mao, Nai-hsien; Ueng, Tzou-Shin; Wang, H.; Watwood, D.

    1991-08-01

    This final report represents a summary of data and interpretations obtained from the Prototype Engineered Barrier System Field Test (PEBSFT) performed in G-Tunnel within the Nevada Test Site. The PEBSFT was conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for future field tests that will be conducted in the Exploratory Studies Facilities (ESF) at Yucca Mountain. The primary objective of the test was to provide a basis for determining whether tests planned for the ESF have the potential to be successful. Chapter 1 on high frequency electromagnetic tomography discusses the rock mass electromagnetic permittivity and attenuation rate changes that were measured to characterize the water distribution in the near field of a simulated waste container. The data are used to obtain quantitative estimates of how the moisture content in the rock mass changes during heating and to infer properties of the spatial variability of water distribution, leading to conclusions about the role of fractures in the system. Chapter 2 discusses the changes in rock moisture content detected by the neutron logging probe. Chapter 3 permeability tests discusses the characterization of the in-situ permeability of the fractured tuff around the borehole. The air permeability testing apparatus, the testing procedures, and the data analysis are presented. Chapter 4 describes the moisture collection system installed in the heater borehole to trap and measure the moisture volumes. Chapter 5 describes relative humidity measurements made with the thermocouple psychrometer and capacitance sensors. Chapter 6 discusses gas pressure measurements in the G-Tunnel, addressing the calibration and installation of piezoresistive-gaged transducers. Chapter 7 describes the calibration and installation of thermocouples for temperature measurements. Chapter 8 discusses the results of the PEBSFT

  9. Quick setup of test unit for accelerator control system

    International Nuclear Information System (INIS)

    Fu, W.; D'Ottavio, T.; Gassner, D.; Nemesure, S.; Morris, J.

    2011-01-01

    Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

  10. Testing methodology of embedded software in digital plant protection system

    International Nuclear Information System (INIS)

    Seong, Ah Young; Choi, Bong Joo; Lee, Na Young; Hwang, Il Soon

    2001-01-01

    It is necessary to assure the reliability of software in order to digitalize RPS(Reactor Protection System). Since RPS causes fatal damage on accidental cases, it is classified as Safety 1E class. Therefore we propose the effective testing methodology to assure the reliability of embedded software in the DPPS(Digital Plant Protection System). To test the embedded software effectively in DPPS, our methodology consists of two steps. The first is the re-engineering step that extracts classes from structural source program, and the second is the level of testing step which is composed of unit testing, Integration Testing and System Testing. On each testing step we test the embedded software with selected test cases after the test item identification step. If we use this testing methodology, we can test the embedded software effectively by reducing the cost and the time

  11. Laboratory results of the AOF system testing

    Science.gov (United States)

    Kolb, Johann; Madec, Pierre-Yves; Arsenault, Robin; Oberti, Sylvain; Paufique, Jérôme; La Penna, Paolo; Ströbele, Stefan; Donaldson, Robert; Soenke, Christian; Suárez Valles, Marcos; Kiekebusch, Mario; Argomedo, Javier; Le Louarn, Miska; Vernet, Elise; Haguenauer, Pierre; Duhoux, Philippe; Aller-Carpentier, Emmanuel; Valenzuela, Jose Javier; Guerra, Juan Carlos

    2016-07-01

    For two years starting in February 2014, the AO modules GRAAL for HAWK-I and GALACSI for MUSE of the Adaptive Optics Facility project have undergone System Testing at ESO's Headquarters. They offer four different modes: NGS SCAO, LGS GLAO in the IR, LGS GLAO and LTAO in the visible. A detailed characterization of those modes was made possible by the existence of ASSIST, a test bench emulating an adaptive VLT including the Deformable Secondary Mirror, a star simulator and turbulence generator and a VLT focal plane re-imager. This phase aimed at validating all the possible components and loops of the AO modules before installation at the actual VLT that comprises the added complexity of real LGSs, a harsher non-reproducible environment and the adaptive telescope control. In this paper we present some of the major results obtained and challenges encountered during the phase of System Tests, like the preparation of the Acquisition sequence, the testing of the Jitter loop, the performance optimization in GLAO and the offload of low-order modes from the DSM to the telescope (restricted to the M2 hexapod). The System Tests concluded with the successful acceptance, shipping, installation and first commissioning of GRAAL in 2015 as well as the acceptance and shipping of GALACSI, ready for installation and commissioning early 2017.

  12. Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities

    Science.gov (United States)

    Hebert, Phillip W., Sr.; Davis, Dawn M.; Turowski, Mark P.; Holladay, Wendy T.; Hughes, Mark S.

    2012-01-01

    The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition systems (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis development and deployment.

  13. Utility Advanced Turbine Systems (ATS) technology readiness testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted horn DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include fill speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.

  14. Resonance test system

    Science.gov (United States)

    Musial, Walter [Boulder, CO; White, Darris [Superior, CO

    2011-05-31

    An apparatus (10) for applying at least one load to a specimen (12) according to one embodiment of the invention may comprise a mass (18). An actuator (20) mounted to the specimen (12) and operatively associated with the mass (18) moves the mass (18) along a linear displacement path (22) that is perpendicular to a longitudinal axis of the specimen (12). A control system (26) operatively associated with the actuator (20) operates the actuator (20) to reciprocate the mass (18) along the linear displacement path (22) at a reciprocating frequency, the reciprocating frequency being about equal to a resonance frequency of the specimen (12) in a test configuration.

  15. 21 CFR 862.1270 - Estrogens (total, in pregnancy) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Estrogens (total, in pregnancy) test system. 862.1270 Section 862.1270 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... Test Systems § 862.1270 Estrogens (total, in pregnancy) test system. (a) Identification. As estrogens...

  16. Microcomputer based test system for charge coupled devices

    International Nuclear Information System (INIS)

    Sidman, S.

    1981-02-01

    A microcomputer based system for testing analog charge coupled integrated circuits has been developed. It measures device performance for three parameters: dynamic range, baseline shift due to leakage current, and transfer efficiency. A companion board tester has also been developed. The software consists of a collection of BASIC and assembly language routines developed on the test system microcomputer

  17. SIMS Prototype System 4: performance test report

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-09

    The results obtained during testing of a self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 4 for field installation.

  18. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    WANDLING, R.R.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  19. Gas characterization system software acceptance test report

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  20. Components and system tests on the RFX toroidal power supply

    International Nuclear Information System (INIS)

    Toigo, V.; Zanotto, L.; Gaio, E.; Perna, M.; Bordignon, P.; Coffetti, A.; Novaro, R.; Bertolotto, P.; Rinaldi, E.; Villa, G.

    2005-01-01

    The paper deals with the component and system tests performed on the new toroidal power supply system of the RFX experiment. The high technological innovation of the system required a deep experimental characterization and validation campaign; special factory tests were performed on prototypes of single components aimed at verifying the most critical design aspects. Consequently an articulated series of tests were performed, based on a step-by-step approach to achieve the desired coordinate operation of the whole system. The test procedures and the most significant results are described in the paper

  1. AN ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PERFORMANCE TESTING OF THE INDUSTRIAL TEST SYSTEM, INC. CYANIDE REAGENTSTRIP™ TEST KIT

    Science.gov (United States)

    Cyanide can be present in various forms in water. The cyanide test kit evaluated in this verification study (Industrial Test System, Inc. Cyanide Regent Strip ™ Test Kit) was designed to detect free cyanide in water. This is done by converting cyanide in water to cyanogen...

  2. Seismic testing and analysis of a prototypic nonlinear piping system

    International Nuclear Information System (INIS)

    Barta, D.A.; Anderson, M.J.; Severud, L.K.

    1982-11-01

    A series of seismic tests and analyses of a nonlinear Fast Flux Test Facility (FFTF) prototypic piping system are described, and measured responses are compared with analytical predictions. The test loop was representative of a typical LMFBR insulated small bore piping system and it was supported from a rigid test frame by prototypic dead weight supports, mechanical snubbers and pipe clamps. Various piping support configurations were tested and analyzed to evaluate the effects of free play and other nonlinear stiffness characteristics on the piping system response

  3. Deciphering the details of RNA aminoglycoside interactions: from atomistic models to biotechnological applications

    Energy Technology Data Exchange (ETDEWEB)

    Ilgu, Muslum [Iowa State Univ., Ames, IA (United States)

    2012-01-01

    A detailed study was done of the neomycin-B RNA aptamer for determining its selectivity and binding ability to both neomycin– and kanamycin-class aminoglycosides. A novel method to increase drug concentrations in cells for more efficiently killing is described. To test the method, a bacterial model system was adopted and several small RNA molecules interacting with aminoglycosides were cloned downstream of T7 RNA polymerase promoter in an expression vector. Then, the growth analysis of E. coli expressing aptamers was observed for 12-hour period. Our analysis indicated that aptamers helped to increase the intracellular concentration of aminoglycosides thereby increasing their efficacy.

  4. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  5. ORF Alignment: NC_006856 [GENIUS II[Archive

    Lifescience Database Archive (English)

    Full Text Available urium] gb|AAV49008.1| Kanamycin ... resistance protein [Suicide plasmid pEE3] ... ref|NP_47814...promoter-probe vector pET2] tpe|CAH17840.1| ... TPA: kanamycin resistance protein [Suicide vector pTE

  6. Preoperational test report, cross-site transfer system integrated test (POTR-007)

    Energy Technology Data Exchange (ETDEWEB)

    Pacquet, E.A.

    1998-04-02

    This report documents the results obtained during the performance of Preoperational Test POTP-007, from December 12, 1997 to March 27, 1998. The main objectives were to demonstrate the operation of the following Cross-Site Transfer System components: Booster pumps P-3125A and P-3125B interlocks and controls, both local and remote; Booster pump P-3125A and P-3125B and associated variable speed drives VSD-1 and VSD-2 performance in both manual and automatic modes; and Water filling, circulation, venting and draining of the transfer headers (supernate and slurry line). As described in reference 1, the following components of the Cross-Site Transfer System that would normally be used during an actual waste transfer, are not used in this specific test: Water Flush System; Valving and instrumentation associated with the 241-SY-A valve pit jumpers; and Valving and instrumentation associated with the 244-A lift station.

  7. Preoperational test report, cross-site transfer system integrated test (POTR-007)

    International Nuclear Information System (INIS)

    Pacquet, E.A.

    1998-01-01

    This report documents the results obtained during the performance of Preoperational Test POTP-007, from December 12, 1997 to March 27, 1998. The main objectives were to demonstrate the operation of the following Cross-Site Transfer System components: Booster pumps P-3125A and P-3125B interlocks and controls, both local and remote; Booster pump P-3125A and P-3125B and associated variable speed drives VSD-1 and VSD-2 performance in both manual and automatic modes; and Water filling, circulation, venting and draining of the transfer headers (supernate and slurry line). As described in reference 1, the following components of the Cross-Site Transfer System that would normally be used during an actual waste transfer, are not used in this specific test: Water Flush System; Valving and instrumentation associated with the 241-SY-A valve pit jumpers; and Valving and instrumentation associated with the 244-A lift station

  8. An Investigation into the Cost of Unit Testing on an Embedded System

    OpenAIRE

    Qiu, Wensi

    2011-01-01

    The quality of embedded software is important, especially for life-critical and mission-critical embedded systems. And software testing is a key activity to ensure the quality of embedded software. Both system testing and unit testing are vital to test embedded software. Unit testing is probably more important to ensure there are no latent faults. System testing is almost invariably done on a target system, but unit testing is normally done on a host system, as standard test frame...

  9. Thermal-hydraulic tests for reactor safety system

    International Nuclear Information System (INIS)

    Chun, Se Young; Chung, Moon Ki; Baek, Won Pil

    2002-05-01

    Tests for the safety depressurization system, Sparger adopted for the Korean next generation reactor, APR1400 are carried out for several geometries with the B and C (Blowdown and Condensation) facility in the condition of high temperature and pressure and with a small test facility in the condition of atmospheric temperature and pressure. Tests for the critical heat flux are performed with the RCS(Reactor Coolant System) facility as well as with the Freon CHF Loop in the condition of high temperature and pressure. The atmospheric temperature and pressure facility is utilized for development of the high standard thermal hydraulic measurement technology. The optical method is developed to measure the local thermal-hydraulic behavior for the single and two-phase boiling phenomena

  10. Formal Specification Based Automatic Test Generation for Embedded Network Systems

    Directory of Open Access Journals (Sweden)

    Eun Hye Choi

    2014-01-01

    Full Text Available Embedded systems have become increasingly connected and communicate with each other, forming large-scaled and complicated network systems. To make their design and testing more reliable and robust, this paper proposes a formal specification language called SENS and a SENS-based automatic test generation tool called TGSENS. Our approach is summarized as follows: (1 A user describes requirements of target embedded network systems by logical property-based constraints using SENS. (2 Given SENS specifications, test cases are automatically generated using a SAT-based solver. Filtering mechanisms to select efficient test cases are also available in our tool. (3 In addition, given a testing goal by the user, test sequences are automatically extracted from exhaustive test cases. We’ve implemented our approach and conducted several experiments on practical case studies. Through the experiments, we confirmed the efficiency of our approach in design and test generation of real embedded air-conditioning network systems.

  11. Systems for animal exposure in full-scale fire tests

    Science.gov (United States)

    Hilado, C. J.; Cumming, H. J.; Kourtides, D. A.; Parker, J. A.

    1977-01-01

    Two systems for exposing animals in full-scale fire tests are described. Both systems involve the simultaneous exposure of two animal species, mice and rats, in modular units; determination of mortality, morbidity, and behavioral response; and analysis of the blood for carboxyhemoglobin. The systems described represent two of many possible options for obtaining bioassay data from full-scale fire tests. In situations where the temperatures to which the test animals are exposed can not be controlled, analytical techniques may be more appropriate than bioassay techniques.

  12. Modeling safety instrumented systems with MooN voting architectures addressing system reconfiguration for testing

    International Nuclear Information System (INIS)

    Torres-Echeverria, A.C.; Martorell, S.; Thompson, H.A.

    2011-01-01

    This paper addresses the modeling of probability of dangerous failure on demand and spurious trip rate of safety instrumented systems that include MooN voting redundancies in their architecture. MooN systems are a special case of k-out-of-n systems. The first part of the article is devoted to the development of a time-dependent probability of dangerous failure on demand model with capability of handling MooN systems. The model is able to model explicitly common cause failure and diagnostic coverage, as well as different test frequencies and strategies. It includes quantification of both detected and undetected failures, and puts emphasis on the quantification of common cause failure to the system probability of dangerous failure on demand as an additional component. In order to be able to accommodate changes in testing strategies, special treatment is devoted to the analysis of system reconfiguration (including common cause failure) during test of one of its components, what is then included in the model. Another model for spurious trip rate is also analyzed and extended under the same methodology in order to empower it with similar capabilities. These two models are powerful enough, but at the same time simple, to be suitable for handling of dependability measures in multi-objective optimization of both system design and test strategies for safety instrumented systems. The level of modeling detail considered permits compliance with the requirements of the standard IEC 61508. The two models are applied to brief case studies to demonstrate their effectiveness. The results obtained demonstrated that the first model is adequate to quantify time-dependent PFD of MooN systems during different system states (i.e. full operation, test and repair) and different MooN configurations, which values are averaged to obtain the PFD avg . Also, it was demonstrated that the second model is adequate to quantify STR including spurious trips induced by internal component failure and

  13. Flight test of a resident backup software system

    Science.gov (United States)

    Deets, Dwain A.; Lock, Wilton P.; Megna, Vincent A.

    1987-01-01

    A new fault-tolerant system software concept employing the primary digital computers as host for the backup software portion has been implemented and flight tested in the F-8 digital fly-by-wire airplane. The system was implemented in such a way that essentially no transients occurred in transferring from primary to backup software. This was accomplished without a significant increase in the complexity of the backup software. The primary digital system was frame synchronized, which provided several advantages in implementing the resident backup software system. Since the time of the flight tests, two other flight vehicle programs have made a commitment to incorporate resident backup software similar in nature to the system described here.

  14. Thermal Vacuum Integrated System Test at B-2

    Science.gov (United States)

    Kudlac, Maureen T.; Weaver, Harold F.; Cmar, Mark D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Space Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility during pump down of the vacuum chamber, operation of the liquid nitrogen heat sink (or cold wall) and the infrared lamp array. A vacuum level of 1.3x10(exp -4)Pa (1x10(exp -6)torr) was achieved. The heat sink provided a uniform temperature environment of approximately 77 K (140deg R) along the entire inner surface of the vacuum chamber. The recently rebuilt and modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m at a chamber diameter of 6.7 m (22 ft) and along 11 m (36 ft) of the chamber s cylindrical vertical interior. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface. The data acquired matched pretest predictions and demonstrated system functionality.

  15. Surface moisture measurement system hardware acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  16. Alanine Enhances Aminoglycosides-Induced ROS Production as Revealed by Proteomic Analysis

    Directory of Open Access Journals (Sweden)

    Jin-zhou Ye

    2018-01-01

    Full Text Available Metabolite-enabled killing of antibiotic-resistant pathogens by antibiotics is an attractive strategy to manage antibiotic resistance. Our previous study demonstrated that alanine or/and glucose increased the killing efficacy of kanamycin on antibiotic-resistant bacteria, whose action is through up-regulating TCA cycle, increasing proton motive force and enhancing antibiotic uptake. Despite the fact that alanine altered several metabolic pathways, other mechanisms could be potentially involved in alanine-mediated kanamycin killing of bacteria which remains to be explored. In the present study, we adopted proteomic approach to analyze the proteome changes induced by exogenous alanine. Our results revealed that the expression of three outer membrane proteins was altered and the deletion of nagE and fadL decreased the intracellular kanamycin concentration, implying their possible roles in mediating kanamycin transport. More importantly, the integrated analysis of proteomic and metabolomic data pointed out that alanine metabolism could connect to riboflavin metabolism that provides the source for reactive oxygen species (ROS production. Functional studies confirmed that alanine treatment together with kanamycin could promote ROS production that in turn potentiates the killing of antibiotic-resistant bacteria. Further investigation showed that alanine repressed the transcription of antioxidant-encoding genes, and alanine metabolism to riboflavin metabolism connected with riboflavin metabolism through TCA cycle, glucogenesis pathway and pentose phosphate pathway. Our results suggest a novel mechanism by which alanine facilitates kanamycin killing of antibiotic-resistant bacteria via promoting ROS production.

  17. Metal coated colloidosomes as carriers for an antibiotic

    Science.gov (United States)

    Sun, Qian; Zhao, Ziyan; Hall, Elizabeth A. H.; Routh, Alexander F.

    2018-06-01

    Colloidosomes are polymer shell microcapsules. They are stable and easy to prepare and have been used to encapsulate drugs for release at specific areas in the body. Traditional polymer shell capsules cannot totally seal drugs, since they are porous and small molecules diffuse through the polymer shell. In this paper, we report a method for encapsulating an antibiotic kanamycin using gold or silver coated colloidosomes. The colloidosomes are impermeable and can be triggered using ultrasound. To investigate the application of the capsules in a biological system, Escherichia Coli (E.coli) was chosen as a model organism. After triggering, the released antibiotic, as well as the metal shell fragments, kill E.coli. Both the silver and gold shells colloidosomes are toxic to this bacterial system and the gold coated colloidosomes can load a higher concentration of kanamycin.

  18. The BNL Accelerator Test Facility control system

    International Nuclear Information System (INIS)

    Malone, R.; Bottke, I.; Fernow, R.; Ben-Zvi, I.

    1993-01-01

    Described is the VAX/CAMAC-based control system for Brookhaven National Laboratory's Accelerator Test Facility, a laser/linac research complex. Details of hardware and software configurations are presented along with experiences of using Vsystem, a commercial control system package

  19. The design of a hardware testing system for the D Zero Detector

    International Nuclear Information System (INIS)

    Angstadt, R.; Johnson, M.; Martin, M.; Matulik, M.; Utes, M.

    1991-11-01

    Testing a system as large as the D Zero data acquisition system is difficult. This paper describes the use of IBM compatible personal computers in a hardware test system that can run on any size system from an engineer's test bench to the entire subsystem in the D Zero Detector. The test system uses a PC to VME bus interface for the local testing and the Token Ring network for more global testing. This system has been implemented for several different hardware systems in D Zero

  20. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver devices. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  1. 1865-IJBCS-Article -Caroline Nywira

    African Journals Online (AJOL)

    hp

    should be no tolerable limit for pathogens in the water intended for ... limits the number of effective drugs available and a good example is ..... antimicrobial susceptibility test, Salmonella isolates were highly resistant to ampicillin and Kanamycin with 100% of the isolates showing resistance. (Table 3). Similar findings were ...

  2. LCLS-II CRYOMODULE TRANSPORT SYSTEM TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Huque, Naeem [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Daly, Edward F. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); McGee, Michael W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2018-04-01

    The Cryomodules (CM) for the Linear Coherent Light Source II (LCLS-II) will be shipped to SLAC (Menlo Park, California) from JLab (Newport News, Virginia) and FNAL (Batavia, Illinois). A transportation system has been designed and built to safely transport the CMs over the road. It uses an array of helical isolator springs to attenuate shocks on the CM to below 1.5g in all directions. The system rides on trailers equipped with Air-Ride suspension, which attenuates vibration loads. The prototype LCLS-II CM (pCM) was driven 750 miles to test the transport system; shock loggers recorded the shock attenuation on the pCM and vacuum gauges were used to detect any compromises in beamline vacuum. Alignment measurements were taken before and after the trip to check whether cavity positions had shifted beyond the ± 0.2mm spec. Passband frequencies and cavity gradients were measured at 2K at the Cryomodule Test Facility (CMTF) at JLab to identify any degradation of CM performance after transportation. The transport system was found to have safely carried the CM and is cleared to begin shipments from JLab and FNAL to SLAC.

  3. Prototype Engineered Barrier System Field Tests (PEBSFT)

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Wilder, D.G.

    1991-02-01

    This progress report presents the interpretation of data obtained (up to November 1, 1988) from the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed for the Yucca Mountain Project (YMP) in G-Tunnel within the Nevada Test site. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for the field tests for future investigations that will be conducted in the Exploratory Shaft Facilities, at a potential high-level radioactive waste repository site in Yucca Mountain. The primary objective of the tests is to provide the basis for determining whether tests planned for Yucca Mountain have the potential to be successful. Thirteen chapters discuss the following: mapping the electromagnetic permittivity and attenuation rate of the rock mass; changes in moisture content detected by the neutron logging probe; characterization of the in-situ permeability of the fractured tuff around the heater borehole; electrical resistance heater installed in a 30-cm borehole; relative humidity measurements; the operation, design, construction, calibration, and installation of a microwave circuit that might provide partial pressure information at temperatures in excess of 200 degree C (392 degree F); pressure and temperature measurements in the G-Tunnel; the moisture collection system, which attempts to collect steam that migrates into the heater borehole; The borehole television and borescope surveys that were performed to map the location, orientation, and aperture of the fractures intersecting the boreholes; preliminary scoping calculations of the hydrothermal conditions expected for this prototype test; the Data Acquisition System; and the results of the PEBSFT, preliminary interpretations of these results, and plans for the remainder of the test. Chapters have been indexed separately for inclusion on the data base

  4. Automated Testing System for a CAN Communication Circuit

    Directory of Open Access Journals (Sweden)

    PRUTIANU, F.

    2012-05-01

    Full Text Available The paper presents a method for validation/testing a control area network (CAN communication circuit used in all electronic control units (ECUs developed in automotive industry after 2000. Using a specific hardware configuration and remotely controlled by LabVIEW. The author's presents their own vision regarding operational software algorithm implementation and integration / execution of some test cases in order to validate a CAN circuit. Using this method, it is possible to validate/test CAN hardware circuits in a short time and with the possibility of saving the test results. Human operator is interfering with the system only through the graphical user interface. The error sources for this system are reduced to minimum.

  5. FMIT test-end instrumentation systems scoping study

    International Nuclear Information System (INIS)

    Fuller, J.L.; Dixon, N.E.; Sheen, E.M.

    1982-06-01

    For the Fusion Materials Irradiation Test facility (FMIT), the high power density of the accelerated deuteron beam and the unique nature of the liquid lithium target underscore the need for sensitive, fast and reliable test-end diagnostic instrumentation. The intense radiation environment in the test cell places severe limits on candidate systems, as to a lesser degree do thermal and lithium compatibility factors. A beam-target diagnostic station at 180 in the HEBT can facilitate source emission and spot-on-target imaging. Analyses support the feasibility of several candidate imaging systems. Incorporation of electromagnetic and electrostatic beam position detectors as part of the target assembly, as previously proposed, should also be feasible. The possibilities for on-line, real-time ultrasonic/acoustic target diagnosis are favorable. The use of redundant thermocouple and ion detector test assembly beam location detectors is also supported because of the possible problems with thermocouples in the intense 14-MeV neutron field and the simplicity of the ion detectors

  6. Oak Ridge Reservation Public Warning Siren System Annual Test Report

    International Nuclear Information System (INIS)

    R. F. Gee

    2000-01-01

    The full operational test of the Oak Ridge Reservation (ORR) Public Warning Siren System (PWSS) was successfully conducted on September 27, 2000. The annual test is a full-scale sounding of the individual siren systems around each of the three Department of Energy (DOE) sites in Oak Ridge, Tennessee. The purpose of the annual test is to demonstrate and validate the siren systems' ability to alert personnel outdoors in the Immediate Notification Zones (INZ) (approximately two miles) around each site. The success of this test is based on two critical functions of the siren system. The first function is system operability. The system is considered operable if 90% of the sirens are operational. System diagnostics and direct field observations were used to validate the operability of the siren systems. Based on the diagnostic results and field observations, greater than 90% of the sirens were considered operational. The second function is system audibility. The system is considered audible if the siren could be heard in the immediate notification zones around each of the three sites. Direct field observations, along with sound level measurements, were used to validate the audibility of the siren system. Based on the direct field observations and sound level measurements, the siren system was considered audible. The combination of field observations, system diagnostic status reports, and sound level measurements provided a high level of confidence that the system met and would meet operational requirements upon demand. As part of the overall system test, the Tennessee Emergency Management Agency (TEMA) activated the Emergency Alerting System (EAS), which utilized area radio stations to make announcements regarding the test and to remind residents of what to do in the event of an actual emergency

  7. Making Cloud-based Systems Elasticity Testing Reproducible

    OpenAIRE

    Albonico , Michel; Mottu , Jean-Marie; Sunyé , Gerson; Alvares , Frederico

    2017-01-01

    International audience; Elastic cloud infrastructures vary computational resources at runtime, i. e., elasticity, which is error-prone. That makes testing throughout elasticity crucial for those systems. Those errors are detected thanks to tests that should run deterministically many times all along the development. However, elasticity testing reproduction requires several features not supported natively by the main cloud providers, such as Amazon EC2. We identify three requirements that we c...

  8. Study on a Footwork Training and Testing System

    Directory of Open Access Journals (Sweden)

    Qi Hu

    2018-02-01

    Full Text Available In the sport science fields, for a long time there are various attempts to explore more advanced technology in order to collect kinds of information concerned during athletes training and matches. In the paper, a footwork training and testing system has been developed by adopting the advanced technology of Wireless Sensor Network (WSN. The system is comprised of some wireless senor nodes and gateways, system control software and so on. By means of the system, the daily footwork training methods and modes will be simulated to automatically guide the training of the athletes, at the same time the training data concerned will be automatically recorded, including moving velocity, moving frequency and success average, moving exercise duration and so on, and it is facilitate to evaluate digitally the training and testing effects for coaches and athletes. The system will bring about an auxiliary means in sport science training and research, make coaches and researchers have more options for the technical and information forms, and provide the technology foundation for synchronizing and intermingling the training and testing smoothly.

  9. Programs for Testing Processor-in-Memory Computing Systems

    Science.gov (United States)

    Katz, Daniel S.

    2006-01-01

    The Multithreaded Microbenchmarks for Processor-In-Memory (PIM) Compilers, Simulators, and Hardware are computer programs arranged in a series for use in testing the performances of PIM computing systems, including compilers, simulators, and hardware. The programs at the beginning of the series test basic functionality; the programs at subsequent positions in the series test increasingly complex functionality. The programs are intended to be used while designing a PIM system, and can be used to verify that compilers, simulators, and hardware work correctly. The programs can also be used to enable designers of these system components to examine tradeoffs in implementation. Finally, these programs can be run on non-PIM hardware (either single-threaded or multithreaded) using the POSIX pthreads standard to verify that the benchmarks themselves operate correctly. [POSIX (Portable Operating System Interface for UNIX) is a set of standards that define how programs and operating systems interact with each other. pthreads is a library of pre-emptive thread routines that comply with one of the POSIX standards.

  10. Laser system for testing radiation imaging detector circuits

    Science.gov (United States)

    Zubrzycka, Weronika; Kasinski, Krzysztof

    2015-09-01

    Performance and functionality of radiation imaging detector circuits in charge and position measurement systems need to meet tight requirements. It is therefore necessary to thoroughly test sensors as well as read-out electronics. The major disadvantages of using radioactive sources or particle beams for testing are high financial expenses and limited accessibility. As an alternative short pulses of well-focused laser beam are often used for preliminary tests. There are number of laser-based devices available on the market, but very often their applicability in this field is limited. This paper describes concept, design and validation of laser system for testing silicon sensor based radiation imaging detector circuits. The emphasis is put on keeping overall costs low while achieving all required goals: mobility, flexible parameters, remote control and possibility of carrying out automated tests. The main part of the developed device is an optical pick-up unit (OPU) used in optical disc drives. The hardware includes FPGA-controlled circuits for laser positioning in 2 dimensions (horizontal and vertical), precision timing (frequency and number) and amplitude (diode current) of short ns-scale (3.2 ns) light pulses. The system is controlled via USB interface by a dedicated LabVIEW-based application enabling full manual or semi-automated test procedures.

  11. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  12. Commercial versus in-situ usability testing of healthcare information systems: towards "public" usability testing in healthcare organizations.

    Science.gov (United States)

    Kushniruk, Andre W; Borycki, Elizabeth M; Kannry, Joseph

    2013-01-01

    The need for improved usability in healthcare IT has been widely recognized. In addition, methods from usability engineering, including usability testing and usability inspection have received greater attention. Many vendors of healthcare software are now employing usability testing methods in the design and development of their products. However, despite this, the usability of healthcare IT is still considered to be problematic and many healthcare organizations that have purchased systems that have been tested at vendor testing sites are still reporting a range of usability and safety issues. In this paper we explore the distinction between commercial usability testing (conducted at centralized vendor usability laboratories and limited beta test sites) and usability testing that is carried out locally within healthcare organizations that have purchased vendor systems and products (i.e. public "in-situ" usability testing). In this paper it will be argued that both types of testing (i.e. commercial vendor-based testing) and in-situ testing are needed to ensure system usability and safety.

  13. Testing Strategies and Methodologies for the Max Launch Abort System

    Science.gov (United States)

    Schaible, Dawn M.; Yuchnovicz, Daniel E.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Engineering and Safety Center (NESC) was tasked to develop an alternate, tower-less launch abort system (LAS) as risk mitigation for the Orion Project. The successful pad abort flight demonstration test in July 2009 of the "Max" launch abort system (MLAS) provided data critical to the design of future LASs, while demonstrating the Agency s ability to rapidly design, build and fly full-scale hardware at minimal cost in a "virtual" work environment. Limited funding and an aggressive schedule presented a challenge for testing of the complex MLAS system. The successful pad abort flight demonstration test was attributed to the project s systems engineering and integration process, which included: a concise definition of, and an adherence to, flight test objectives; a solid operational concept; well defined performance requirements, and a test program tailored to reducing the highest flight test risks. The testing ranged from wind tunnel validation of computational fluid dynamic simulations to component ground tests of the highest risk subsystems. This paper provides an overview of the testing/risk management approach and methodologies used to understand and reduce the areas of highest risk - resulting in a successful flight demonstration test.

  14. Link System Performance at the First Global Test of the CMS Alignment System

    International Nuclear Information System (INIS)

    Arce, P.; Calvo, E.; Figueroa, C. F.; Rodrigo, T.; Vila, I.; Virto, A. L.; Barcala, J. M.; Fernandez, M. G.; Ferrando, A.; Josa, M. I.; Molinero, A.; Oller, J. C.

    2001-01-01

    A test of components and a global test of the CMS alignment system was performed at the 14 hall of the ISR tunnel at CERN along Summer 2000. Positions are reconstructed and compared to survey measurements. The obtained results from the measurements of the Link System are presented here. (Author) 12 refs

  15. Link System Performance at the First Global Test of the CMS Alignment System

    Energy Technology Data Exchange (ETDEWEB)

    Arce, P.; Calvo, E.; Figueroa, C.F.; Rodrigo, T.; Vila, I.; Virto, A.L. [Universidad de Cantabria (Spain); Barcala, J.M.; Fernandez, M.G.; Ferrando, A.; Josa, M.I.; Molinero, A.; Oller, J.C. [CIEMAT, Madrid (Spain)

    2001-07-01

    A test of components and a global test of the CMS alignment system was performed at the 14 hall of the ISR tunnel at CERN along Summer 2000. Positions are reconstructed and compared to survey measurements. The obtained results from the measurements of the Link System are presented here. (Author) 12 refs.

  16. Initial testing of the tritium systems at the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Anderson, J.L.; Sissingh, R.A.P.; Gentile, C.A.; Rossmassler, R.L.; Walters, R.T.; Voorhees, D.R.

    1993-01-01

    The Tokamak Fusion Test Reactor (TFTR) at Princeton will start its D-T experiments in late 1993, introducing and operating the tokamak with tritium in order to begin the study of burning plasma physics in D-T. Trace tritium injection experiments, using small amounts of tritium will begin in the fall of 1993. In preparation for these experiments, a series of tests with low concentrations of tritium inn deuterium have been performed as an initial qualification of the tritium systems. These tests began in April 1993. This paper describes the initial testing of the equipment in the TFTR tritium facility

  17. Testing methodologies and systems for semiconductor optical amplifiers

    Science.gov (United States)

    Wieckowski, Michael

    Semiconductor optical amplifiers (SOA's) are gaining increased prominence in both optical communication systems and high-speed optical processing systems, due primarily to their unique nonlinear characteristics. This in turn, has raised questions regarding their lifetime performance reliability and has generated a demand for effective testing techniques. This is especially critical for industries utilizing SOA's as components for system-in-package products. It is important to note that very little research to date has been conducted in this area, even though production volume and market demand has continued to increase. In this thesis, the reliability of dilute-mode InP semiconductor optical amplifiers is studied experimentally and theoretically. The aging characteristics of the production level devices are demonstrated and the necessary techniques to accurately characterize them are presented. In addition, this work proposes a new methodology for characterizing the optical performance of these devices using measurements in the electrical domain. It is shown that optical performance degradation, specifically with respect to gain, can be directly qualified through measurements of electrical subthreshold differential resistance. This metric exhibits a linear proportionality to the defect concentration in the active region, and as such, can be used for prescreening devices before employing traditional optical testing methods. A complete theoretical analysis is developed in this work to explain this relationship based upon the device's current-voltage curve and its associated leakage and recombination currents. These results are then extended to realize new techniques for testing semiconductor optical amplifiers and other similarly structured devices. These techniques can be employed after fabrication and during packaged operation through the use of a proposed stand-alone testing system, or using a proposed integrated CMOS self-testing circuit. Both methods are capable

  18. Electrical performance characteristics of the SSC Accelerator System String Test

    International Nuclear Information System (INIS)

    Robinson, W.; Burgett, W.; Dombeck, T.; Gannon, J.; Kraushaar, P.; McInturff, A.; Savord, T.; Tool, G.

    1993-01-01

    The string test facility was constructed to provide a development test bed for the arc regions of the Superconducting Super Collider (SSC). Significant effort has been devoted to the development and testing of superconducting magnets, spools, and accelerator control systems required for the SSC. The string test facility provides the necessary environment required to evaluate the operational performance of these components as they are configured as an accelerator lens in the collider. This discussion will review the results of high current testing of the string conducted to evaluate magnet element uniformity and compatibility, the splice resistance used to connect the magnets, and system response to various quench conditions. Performance results of the spools, energy bypass systems, energy dump, and the power supply system are also discussed

  19. Electrical performance characteristics of the SSC Accelerator System String Test

    International Nuclear Information System (INIS)

    Robinson, W.; Burgett, W.; Dombeck, T.; Gannon, J.; Kraushaar, P.; McInturff, A.; Savord, T.; Tool, G.

    1993-05-01

    The string test facility was constructed to provide a development test bed for the arc regions of the Superconducting Super Collider (SSC). Significant effort has been devoted to the development and testing of superconducting magnets, spools, and accelerator control systems required for the SSC. The string test facility provides the necessary environment required to evaluate the operational performance of these components as they are configured as an accelerator lens in the collider. This discussion will review the results of high current testing of the string conducted to evaluate magnet element uniformity and compatibility, the splice resistance used to connect the magnets, and system response to various quench conditions. Performance results of the spools, energy bypass systems, energy dump, and the power supply system are also discussed

  20. Non Nuclear Testing of Reactor Systems In The Early Flight Fission Test Facilities (EFF-TF)

    International Nuclear Information System (INIS)

    Van Dyke, Melissa; Martin, James

    2004-01-01

    The Early Flight Fission-Test Facility (EFF-TF) can assist in the design and development of systems through highly effective non-nuclear testing of nuclear systems when technical issues associated with near-term space fission systems are 'non-nuclear' in nature (e.g. system's nuclear operations are understood). For many systems, thermal simulators can be used to closely mimic fission heat deposition. Axial power profile, radial power profile, and fuel pin thermal conductivity can be matched. In addition to component and subsystem testing, operational and lifetime issues associated with the steady state and transient performance of the integrated reactor module can be investigated. Instrumentation at the EFF-TF allows accurate measurement of temperature, pressure, strain, and bulk core deformation (useful for accurately simulating nuclear behavior). Ongoing research at the EFF-TF is geared towards facilitating research, development, system integration, and system utilization via cooperative efforts with DOE laboratories, industry, universities, and other Nasa centers. This paper describes the current efforts for the latter portion of 2003 and beginning of 2004. (authors)

  1. A Simple Model for Inducing Optimal Increase of SDF-1 with Aminoglycoside Ototoxicity

    Directory of Open Access Journals (Sweden)

    Hyun Mi Ju

    2017-01-01

    Full Text Available Objectives. As a homing factor of stem cell, stromal derived factor-1 (SDF-1 is important for the regenerative research in ototoxicity. Mice models with aminoglycoside ototoxicity have been widely used to study the regeneration capacity of MSCs in repair of cochlear injury. We developed a mouse model with maximal increase in SDF-1 levels in the inner ear, according to the “one-shot” doses of kanamycin and furosemide. Methods. C57BL/6 mice had kanamycin (420, 550, and 600 mg/kg dissolved in PBS, followed by an intraperitoneal injection of furosemide (130 mg/kg. The injuries of inner ear were measured with hearing thresholds, histology, and outer hair cell counts at 0, 3, 5, 7, 10, and 14 days before the sacrifice. The levels of SDF-1 in the inner ear were tested by real-time RT-PCR and immunohistochemistry. Results. There were a significant reduction in hearing thresholds and a maximal increase of SDF-1 levels in the furosemide 130 mg/kg + kanamycin 550 mg/kg group, but severe hearing deterioration over time was observed in the furosemide 130 mg/kg + kanamycin 600 mg/kg group and four mice were dead. SDF-1 was detected mostly in the stria vascularis and organ of Corti showing the highest increase in expression. Conclusion. We observed optimal induction of the stem cell homing factor in the newly generated aminoglycoside-induced ototoxicity mouse model using a “one-shot” protocol. This study regarding high SDF-1 levels in our mouse model of ototoxicity would play a major role in the development of therapeutic agents using MSC homing.

  2. Development of performance tests for an automated MC and A system

    International Nuclear Information System (INIS)

    Kok, K.D.; Klingensmith, R.W.; Riffle, W.; Carver, R.D.; Schumacher, S.S.; Lavender, J.C.; Smith, B.W.

    1988-01-01

    Performance tests of MC and A systems using computers are described, and some example scenarios are discussed. Facility personnel or an external inspection group may use performance tests to evaluate MC and A capabilities under actual operating conditions. This paper addresses test elements common to both user groups. Performance tests consist of scenario development, security, and safety measures, conduct, and evaluation. Because exercises often test scenarios against which the MC and A system is protecting, they may require additional security and safety measures. Computer systems enhance MC and A by providing greater speed, increased precision, and automated checks. Performance tests for MC and A systems using computers differ from performance tests employing manual data systems in that the scenarios must anticipate computer actions rather than utilize controllers to adjust the scenario

  3. Digital System Reliability Test for the Evaluation of safety Critical Software of Digital Reactor Protection System

    Directory of Open Access Journals (Sweden)

    Hyun-Kook Shin

    2006-08-01

    Full Text Available A new Digital Reactor Protection System (DRPS based on VME bus Single Board Computer has been developed by KOPEC to prevent software Common Mode Failure(CMF inside digital system. The new DRPS has been proved to be an effective digital safety system to prevent CMF by Defense-in-Depth and Diversity (DID&D analysis. However, for practical use in Nuclear Power Plants, the performance test and the reliability test are essential for the digital system qualification. In this study, a single channel of DRPS prototype has been manufactured for the evaluation of DRPS capabilities. The integrated functional tests are performed and the system reliability is analyzed and tested. The results of reliability test show that the application software of DRPS has a very high reliability compared with the analog reactor protection systems.

  4. Development report: Automatic System Test and Calibration (ASTAC) equipment

    Science.gov (United States)

    Thoren, R. J.

    1981-01-01

    A microcomputer based automatic test system was developed for the daily performance monitoring of wind energy system time domain (WEST) analyzer. The test system consists of a microprocessor based controller and hybrid interface unit which are used for inputing prescribed test signals into all WEST subsystems and for monitoring WEST responses to these signals. Performance is compared to theoretically correct performance levels calculated off line on a large general purpose digital computer. Results are displayed on a cathode ray tube or are available from a line printer. Excessive drift and/or lack of repeatability of the high speed analog sections within WEST is easily detected and the malfunctioning hardware identified using this system.

  5. Spacecraft Data Simulator for the test of level zero processing systems

    Science.gov (United States)

    Shi, Jeff; Gordon, Julie; Mirchandani, Chandru; Nguyen, Diem

    1994-01-01

    The Microelectronic Systems Branch (MSB) at Goddard Space Flight Center (GSFC) has developed a Spacecraft Data Simulator (SDS) to support the development, test, and verification of prototype and production Level Zero Processing (LZP) systems. Based on a disk array system, the SDS is capable of generating large test data sets up to 5 Gigabytes and outputting serial test data at rates up to 80 Mbps. The SDS supports data formats including NASA Communication (Nascom) blocks, Consultative Committee for Space Data System (CCSDS) Version 1 & 2 frames and packets, and all the Advanced Orbiting Systems (AOS) services. The capability to simulate both sequential and non-sequential time-ordered downlink data streams with errors and gaps is crucial to test LZP systems. This paper describes the system architecture, hardware and software designs, and test data designs. Examples of test data designs are included to illustrate the application of the SDS.

  6. Experimental Results of Integrated Refrigeration and Storage System Testing

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Jumper, K.

    2009-01-01

    Launch operations engineers at the Kennedy Space Center have identified an Integrated Refrigeration and Storage system as a promising technology to reduce launch costs and enable advanced cryogenic operations. This system uses a close cycle Brayton refrigerator to remove energy from the stored cryogenic propellant. This allows for the potential of a zero loss storage and transfer system, as well and control of the state of the propellant through densification or re-liquefaction. However, the behavior of the fluid in this type of system is different than typical cryogenic behavior, and there will be a learning curve associated with its use. A 400 liter research cryostat has been designed, fabricated and delivered to KSC to test the thermo fluid behavior of liquid oxygen as energy is removed from the cryogen by a simulated DC cycle cryocooler. Results of the initial testing phase focusing on heat exchanger characterization and zero loss storage operations using liquid oxygen are presented in this paper. Future plans for testing of oxygen densification tests and oxygen liquefaction tests will also be discussed. KEYWORDS: Liquid Oxygen, Refrigeration, Storage

  7. Preoperational test report, primary ventilation condenser cooling system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-10-29

    This represents the preoperational test report for the Primary Ventilation Condenser Cooling System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system uses a closed chilled water piping loop to provide offgas effluent cooling for tanks AY101, AY102, AZ1O1, AZ102; the offgas is cooled from a nominal 100 F to 40 F. Resulting condensation removes tritiated vapor from the exhaust stack stream. The piping system includes a package outdoor air-cooled water chiller with parallel redundant circulating pumps; the condenser coil is located inside a shielded ventilation equipment cell. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  8. Preoperational test report, primary ventilation condenser cooling system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents the preoperational test report for the Primary Ventilation Condenser Cooling System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system uses a closed chilled water piping loop to provide offgas effluent cooling for tanks AY101, AY102, AZ1O1, AZ102; the offgas is cooled from a nominal 100 F to 40 F. Resulting condensation removes tritiated vapor from the exhaust stack stream. The piping system includes a package outdoor air-cooled water chiller with parallel redundant circulating pumps; the condenser coil is located inside a shielded ventilation equipment cell. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  9. 21 CFR 866.5100 - Antinuclear antibody immunological test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Antinuclear antibody immunological test system....5100 Antinuclear antibody immunological test system. (a) Identification. An antinuclear antibody... the autoimmune antibodies in serum, other body fluids, and tissues that react with cellular nuclear...

  10. The Max Launch Abort System - Concept, Flight Test, and Evolution

    Science.gov (United States)

    Gilbert, Michael G.

    2014-01-01

    The NASA Engineering and Safety Center (NESC) is an independent engineering analysis and test organization providing support across the range of NASA programs. In 2007 NASA was developing the launch escape system for the Orion spacecraft that was evolved from the traditional tower-configuration escape systems used for the historic Mercury and Apollo spacecraft. The NESC was tasked, as a programmatic risk-reduction effort to develop and flight test an alternative to the Orion baseline escape system concept. This project became known as the Max Launch Abort System (MLAS), named in honor of Maxime Faget, the developer of the original Mercury escape system. Over the course of approximately two years the NESC performed conceptual and tradeoff analyses, designed and built full-scale flight test hardware, and conducted a flight test demonstration in July 2009. Since the flight test, the NESC has continued to further develop and refine the MLAS concept.

  11. The International English Language Testing System (IELTS): The Speaking Test.

    Science.gov (United States)

    Ingram, D. E.

    1991-01-01

    The International English Language Testing System (IELTS) assesses proficiency in English both generally and for special purposes of non-native English speakers studying, training, or learning English in English-speaking countries. The Speaking subtest of the IELTS measures a candidate's general proficiency in speaking in everyday situations via a…

  12. Metabolomic approach to optimizing and evaluating antibiotic treatment in the axenic culture of cyanobacterium Nostoc flagelliforme.

    Science.gov (United States)

    Han, Pei-pei; Jia, Shi-ru; Sun, Ying; Tan, Zhi-lei; Zhong, Cheng; Dai, Yu-jie; Tan, Ning; Shen, Shi-gang

    2014-09-01

    The application of antibiotic treatment with assistance of metabolomic approach in axenic isolation of cyanobacterium Nostoc flagelliforme was investigated. Seven antibiotics were tested at 1-100 mg L(-1), and order of tolerance of N. flagelliforme cells was obtained as kanamycin > ampicillin, tetracycline > chloromycetin, gentamicin > spectinomycin > streptomycin. Four antibiotics were selected based on differences in antibiotic sensitivity of N. flagelliforme and associated bacteria, and their effects on N. flagelliforme cells including the changes of metabolic activity with antibiotics and the metabolic recovery after removal were assessed by a metabolomic approach based on gas chromatography-mass spectrometry combined with multivariate analysis. The results showed that antibiotic treatment had affected cell metabolism as antibiotics treated cells were metabolically distinct from control cells, but the metabolic activity would be recovered via eliminating antibiotics and the sequence of metabolic recovery time needed was spectinomycin, gentamicin > ampicillin > kanamycin. The procedures of antibiotic treatment have been accordingly optimized as a consecutive treatment starting with spectinomycin, then gentamicin, ampicillin and lastly kanamycin, and proved to be highly effective in eliminating the bacteria as examined by agar plating method and light microscope examination. Our work presented a strategy to obtain axenic culture of N. flagelliforme and provided a method for evaluating and optimizing cyanobacteria purification process through diagnosing target species cellular state.

  13. Development of a test system for high level liquid waste partitioning

    Directory of Open Access Journals (Sweden)

    Duan Wu H.

    2015-01-01

    Full Text Available The partitioning and transmutation strategy has increasingly attracted interest for the safe treatment and disposal of high level liquid waste, in which the partitioning of high level liquid waste is one of the critical technical issues. An improved total partitioning process, including a tri-alkylphosphine oxide process for the removal of actinides, a crown ether strontium extraction process for the removal of strontium, and a calixcrown ether cesium extraction process for the removal of cesium, has been developed to treat Chinese high level liquid waste. A test system containing 72-stage 10-mm-diam annular centrifugal contactors, a remote sampling system, a rotor speed acquisition-monitoring system, a feeding system, and a video camera-surveillance system was successfully developed to carry out the hot test for verifying the improved total partitioning process. The test system has been successfully used in a 160 hour hot test using genuine high level liquid waste. During the hot test, the test system was stable, which demonstrated it was reliable for the hot test of the high level liquid waste partitioning.

  14. WRAP module 1 data management system software test report

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1997-01-01

    This document summarizes the test result information for the Data Management System (DMS). Appendix A contains test result information for all Functional Test cases and Appendix B contains the results for all the Performance Test cases

  15. Test-Access Planning and Test Scheduling for Embedded Core-Based System Chips

    NARCIS (Netherlands)

    Goel, Sandeep Kumar

    2005-01-01

    Advances in the semiconductor process technology enable the creation of a complete system on one single die, the so-called system chip or SOC. To reduce time-to-market for large SOCs, reuse of pre-designed and pre-veried blocks called cores is employed. Like the design style, testing of SOCs can be

  16. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  17. UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    1999-04-01

    The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer conflation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. The objective of this task is to design 7H and 9H compressor rotor and stator structures with the goal of achieving high efficiency at lower cost and greater durability by applying proven GE Power Systems (GEPS) heavy-duty use design practices. The designs will be based on the GE Aircraft Engines (GEAE) CF6-80C2 compressor. Transient and steady-state thermo-mechanical stress analyses will be run to ensure compliance with GEPS life standards. Drawings will be prepared for forgings, castings, machining, and instrumentation for full speed, no load (FSNL) tests of the first unit on both 9H and 7H applications.

  18. Tension test system for irradiated small specimens operated by remote control

    International Nuclear Information System (INIS)

    Okada, Akira

    1993-01-01

    A robot-based tension test system has been developed to aid in the mechanical testing of highly radioactive specimens. This system reduces radiation hazards from specimens and allows for the uniform precision of testing results independent of experimenters' skills. The robot system is designed to accommodate a miniaturized tension specimen with a gage section 5.5 by 1.2 mm, with a total length and width of 12.5 and 2.3 mm, respectively, and thickness of about 0.2 mm. The system is composed of a manipulating robot, a vibrational-type specimen feeder, a rotating-type specimen tray, a specimen observation system, a simulated tension text fixture, and a microcomputer for controlling the system. This system accomplishes specimen arrangement in the specimen tray, specimen transportation and loading to the test fixture and testing, and removal of the broken specimen from the fixture. These procedures are performed quickly, safely, and with uniform testing precision by computer control remotely by an unskilled experimenter

  19. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  20. Operational test report for 2706-T complex liquid transfer system

    International Nuclear Information System (INIS)

    BENZEL, H.R.

    1999-01-01

    This document is the Operational Test Report (OTR). It enters the Record Copy of the W-259 Operational Test Procedure (HNF-3610) into the document retrieval system. Additionally, the OTR summarizes significant issues associated with testing the 2706-T waste liquid transfer and storage system

  1. Development and Application of a Portable Health Algorithms Test System

    Science.gov (United States)

    Melcher, Kevin J.; Fulton, Christopher E.; Maul, William A.; Sowers, T. Shane

    2007-01-01

    This paper describes the development and initial demonstration of a Portable Health Algorithms Test (PHALT) System that is being developed by researchers at the NASA Glenn Research Center (GRC). The PHALT System was conceived as a means of evolving the maturity and credibility of algorithms developed to assess the health of aerospace systems. Comprising an integrated hardware-software environment, the PHALT System allows systems health management algorithms to be developed in a graphical programming environment; to be tested and refined using system simulation or test data playback; and finally, to be evaluated in a real-time hardware-in-the-loop mode with a live test article. In this paper, PHALT System development is described through the presentation of a functional architecture, followed by the selection and integration of hardware and software. Also described is an initial real-time hardware-in-the-loop demonstration that used sensor data qualification algorithms to diagnose and isolate simulated sensor failures in a prototype Power Distribution Unit test-bed. Success of the initial demonstration is highlighted by the correct detection of all sensor failures and the absence of any real-time constraint violations.

  2. GSETT-3: testing the experimental international seismic monitoring system

    International Nuclear Information System (INIS)

    Ringdal, Frode

    1995-01-01

    Global seismic monitoring system has been developed by the Conference on Disarmaments (CDs) ad hoc group of scientific experts to consider international cooperative measures to detect and identify seismic events (the GSE), based in Geneva. In the course of its work, the GSE has conducted two large-scale global technical tests, Global Seismic Events Technical Test-1 (GSETT-1) in 1984 and GSETT-2 in 1991. The GSE has now embarked upon its third and most ambitious technical test, GSETT-3, which will encompass the development, testing and evaluation of a working prototype of the eventual Comprehensive Test Ban Treaty (CTBT) seismic monitoring system

  3. 40 CFR 160.43 - Test system care facilities.

    Science.gov (United States)

    2010-07-01

    ... testing facility shall have a number of animal rooms or other test system areas separate from those... housed, facilities shall exist for the collection and disposal of all animal waste and refuse or for safe sanitary storage of waste before removal from the testing facility. Disposal facilities shall be so...

  4. Utility advanced turbine systems (ATS) technology readiness testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-15

    The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of a highly efficient, environmentally superior, and cost-competitive utility ATS for base-load utility-scale power generation, the GE 7H (60 Hz) combined cycle power system, and related 9H (50 Hz) common technology. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.

  5. Spent fuel drying system test results (first dry-run)

    International Nuclear Information System (INIS)

    Klinger, G.S.; Oliver, B.M.; Abrefah, J.; Marschman, S.C.; MacFarlan, P.J.; Ritter, G.A.

    1998-07-01

    The water-filled K-Basins in the Hanford 100 Area have been used to store N-Reactor spent nuclear fuel (SNF) since the 1970s. Because some leaks in the basin have been detected and some of the fuel is breached due to handling damage and corrosion, efforts are underway to remove the fuel elements from wet storage. An Integrated Process Strategy (IPS) has been developed to package, dry, transport, and store these metallic uranium fuel elements in an interim storage facility on the Hanford Site. Information required to support the development of the drying processes, and the required safety analyses, is being obtained from characterization tests conducted on fuel elements removed from the K-Basins. A series of whole element drying tests (reported in separate documents, see Section 7.0) have been conducted by Pacific Northwest National Laboratory (PNNL) on several intact and damaged fuel elements recovered from both the K-East and K-West Basins. This report documents the results of the first dry-run test, which was conducted without a fuel element. The empty test apparatus was subjected to a combination of low- and high-temperature vacuum drying treatments that were intended to mimic, wherever possible, the fuel treatment strategies of the IPS. The data from this dry-run test can serve as a baseline for the first two fuel element tests, 1990 (Run 1) and 3128W (Run 2). The purpose of this dry-run was to establish the background levels of hydrogen in the system, and the hydrogen generation and release characteristics attributable to the test system without a fuel element present. This test also serves to establish the background levels of water in the system and the water release characteristics. The system used for the drying test series was the Whole Element Furnace Testing System, described in Section 2.0, which is located in the Postirradiation Testing Laboratory (PTL, 327 Building). The test conditions and methodology are given in section 3.0, and the experimental

  6. Earthquake Early Warning ShakeAlert System: Testing and certification platform

    Science.gov (United States)

    Cochran, Elizabeth S.; Kohler, Monica D.; Given, Douglas; Guiwits, Stephen; Andrews, Jennifer; Meier, Men-Andrin; Ahmad, Mohammad; Henson, Ivan; Hartog, Renate; Smith, Deborah

    2017-01-01

    Earthquake early warning systems provide warnings to end users of incoming moderate to strong ground shaking from earthquakes. An earthquake early warning system, ShakeAlert, is providing alerts to beta end users in the western United States, specifically California, Oregon, and Washington. An essential aspect of the earthquake early warning system is the development of a framework to test modifications to code to ensure functionality and assess performance. In 2016, a Testing and Certification Platform (TCP) was included in the development of the Production Prototype version of ShakeAlert. The purpose of the TCP is to evaluate the robustness of candidate code that is proposed for deployment on ShakeAlert Production Prototype servers. TCP consists of two main components: a real‐time in situ test that replicates the real‐time production system and an offline playback system to replay test suites. The real‐time tests of system performance assess code optimization and stability. The offline tests comprise a stress test of candidate code to assess if the code is production ready. The test suite includes over 120 events including local, regional, and teleseismic historic earthquakes, recentering and calibration events, and other anomalous and potentially problematic signals. Two assessments of alert performance are conducted. First, point‐source assessments are undertaken to compare magnitude, epicentral location, and origin time with the Advanced National Seismic System Comprehensive Catalog, as well as to evaluate alert latency. Second, we describe assessment of the quality of ground‐motion predictions at end‐user sites by comparing predicted shaking intensities to ShakeMaps for historic events and implement a threshold‐based approach that assesses how often end users initiate the appropriate action, based on their ground‐shaking threshold. TCP has been developed to be a convenient streamlined procedure for objectively testing algorithms, and it has

  7. Specification and testing of optics for LIS system

    International Nuclear Information System (INIS)

    Singh, Sunita; Sridhar, G.; Rawat, V.S.; Gantayet, L.M.

    2005-01-01

    Optical component specification for the high average power lasers and laser beam transport system used in the laser isotope separation demonstration facility must address demanding system performance requirements. In a typical demonstration facility a few thousand of commercial and custom optical components are required. The optical system is expected to perform at a high level of optical efficiency and reliability. Evaluation and testing of optical components used in LIS plant is critical for qualification of suppliers and assurance of performance in the actual process. The stringent specifications require specialized test equipment and techniques, which are not routine. Careful planning with the optics manufacturer, detailed quality assurance plan, comprehensive procedures for testing and evaluation, and a plan for corrective action are required. The specifications are given on material characteristics, surface quality and flatness, reflectance or transmittance and high average power laser damage. Our approach to specifying, testing the performance characteristics and assuring quality of optical components required for the technology demonstration of laser based isotopic clean-up of 233 U project is presented. (author)

  8. Fuel cleanup system for the tritium systems test assembly: design and experiments

    International Nuclear Information System (INIS)

    Kerr, E.C.; Bartlit, J.R.; Sherman, R.H.

    1980-01-01

    A major subsystem of the Tritium Systems Test Assembly is the Fuel Cleanup System (FCU) whose functons are to: (1) remove impurities in the form of argon and tritiated methane, water, and ammonia from the reactor exhaust stream and (2) recover tritium for reuse from the tritiated impurities. To do this, a hybrid cleanup system has been designed which utilizes and will test concurrently two differing technologies - one based on disposable, hot metal (U and Ti) getter beds and a second based on regenerable cryogenic asdorption beds followed by catalytic oxidation of impurities to DTO and stackable gases and freezout of the resultant DTO to recover essentially all tritium for reuse

  9. Cryogenic distribution system for ITER proto-type cryoline test

    International Nuclear Information System (INIS)

    Bhattacharya, R.; Shah, N.; Badgujar, S.; Sarkar, B.

    2012-01-01

    Design validation for ITER cryoline will be carried out by proto-type test on cryoline. The major objectives of the test will be to ensure the mechanical integrity, reliability, thermal stress and heat load as well as checking of assembly and fabrication procedures. The cryogenics system has to satisfy the functional operating scenario of the cryoline. Cryoplant, distribution box (DB) including liquid helium (LHe) tank constitute the cryogenic system for the test. Conceptual system architecture is proposed with a commercially available refrigerator/liquefier and custom designed DB housing cold compressor, cold circulator as well as phase separator with sub-merged heat exchanger. System level optimization, mainly with DB and LHe tank with options, has been studied to minimize the cold power required for the system. Aspen HYSYS is used for the purpose of process simulation. The paper describes the system architecture and the optimized design as well as process simulation with associated results. (author)

  10. Test of Seal System for Flexible Pipe End Fitting

    DEFF Research Database (Denmark)

    Banke, Lars; Jensen, Thomas Gregers

    1999-01-01

    The purpose of the end fitting seal system is to ensure leak proof termination of flexible pipes. The seal system of an NKT end fitting normally consists of a number of ring joint gaskets mounted in a steel sleeve on the outside of the polymeric inner liner of the pipe. The seal system is activated...... by compression of the gaskets, thus using the geometry to establish a seal towards the inner liner of the pipe and the steel sleeve of the end fitting. This paper describes how the seal system of an end fitting can be tested using an autoclave. By regulating temperature and pressure, the seal system can...... be tested up to 130oC and 51.7 MPa. Pressure, temperature and the mechanical behaviours of the pipe are measured for use in further research. The set-up is used to test the efficiency of the seal system as function of parameters such as cross sectional shapes of the gaskets, tolerances between gaskets...

  11. PLC based control system for RAM assembly test facility

    International Nuclear Information System (INIS)

    Kulkarni, S.S.; Kumar, Vinaya; Chandra, Umesh

    1994-01-01

    The flexibility, expandability, ease of programming and diagnostic features makes the programmable logic controller (PLC) suitable for a variety of control applications in engineering system test facilities. A PLC based control system for RAM assembly test facility (RATF) and for testing the related hydraulic components is being developed and installed at BARC. This paper describes the approach taken for meeting the control requirements and illustrates the PLC software that has been developed. (author). 1 fig

  12. ANOLE Portable Radiation Detection System Field Test and Evaluation Campaign

    International Nuclear Information System (INIS)

    Hodge, Chris A.

    2007-01-01

    Handheld, backpack, and mobile sensors are elements of the Global Nuclear Detection System for the interdiction and control of illicit radiological and nuclear materials. They are used by the U.S. Department of Homeland Security (DHS) and other government agencies and organizations in various roles for border protection, law enforcement, and nonproliferation monitoring. In order to systematically document the operational performance of the common commercial off-the-shelf portable radiation detection systems, the DHS Domestic Nuclear Detection Office conducted a test and evaluation campaign conducted at the Nevada Test Site from January 18 to February 27, 2006. Named 'Anole', it was the first test of its kind in terms of technical design and test complexities. The Anole test results offer users information for selecting appropriate mission-specific portable radiation detection systems. The campaign also offered manufacturers the opportunity to submit their equipment for independent operationally relevant testing to subsequently improve their detector performance. This paper will present the design, execution, and methodologies of the DHS Anole portable radiation detection system test campaign

  13. Development of TIG Welding System for a Nuclear Fuel Test Rig

    Energy Technology Data Exchange (ETDEWEB)

    Joung, Changyoung; Ahn, Sungho; Hong, Jintae; Kim, Kahye [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    The welding process is one of the most important among the instrumentation processes of the nuclear fuel test rig and rods. To manufacture the nuclear fuel test rig, a precision welding system needs to be fabricated to develop various welding technologies of the fuel test rig and rods jointing the various sensors and end caps on a fuel cladding tube, which is charged with fuel pellets and component parts. Thus, we designed and fabricated the precision welding system consisting of an orbital TIG welder, a low-pressure chamber, and a high-pressure chamber. Using this system, the performance tests were performed with the round and seal spot welds for each welding condition. This paper describes not only the contents for the fabrication of precision TIG welding system but also some results from weld tests using the low-pressure and high-pressure chambers to verify the performance of this system. The TIG welding system was developed to manufacture the nuclear fuel test rig and rods. It has been configured to be able to weld the nuclear fuel test rigs and rods by applying the TIG welder using a low-pressure chamber and a high-pressure chamber. The performance tests using this system were performed with the round and seal spot welds for the welding conditions. The soundness of the orbital TIG welding system was confirmed through performance tests in the low-pressure and high-pressure chambers.

  14. Development of TIG Welding System for a Nuclear Fuel Test Rig

    International Nuclear Information System (INIS)

    Joung, Changyoung; Ahn, Sungho; Hong, Jintae; Kim, Kahye

    2013-01-01

    The welding process is one of the most important among the instrumentation processes of the nuclear fuel test rig and rods. To manufacture the nuclear fuel test rig, a precision welding system needs to be fabricated to develop various welding technologies of the fuel test rig and rods jointing the various sensors and end caps on a fuel cladding tube, which is charged with fuel pellets and component parts. Thus, we designed and fabricated the precision welding system consisting of an orbital TIG welder, a low-pressure chamber, and a high-pressure chamber. Using this system, the performance tests were performed with the round and seal spot welds for each welding condition. This paper describes not only the contents for the fabrication of precision TIG welding system but also some results from weld tests using the low-pressure and high-pressure chambers to verify the performance of this system. The TIG welding system was developed to manufacture the nuclear fuel test rig and rods. It has been configured to be able to weld the nuclear fuel test rigs and rods by applying the TIG welder using a low-pressure chamber and a high-pressure chamber. The performance tests using this system were performed with the round and seal spot welds for the welding conditions. The soundness of the orbital TIG welding system was confirmed through performance tests in the low-pressure and high-pressure chambers

  15. Test processing integrated system (S.I.D.E.X.)

    International Nuclear Information System (INIS)

    Sabas, M.; Oules, H.; Badel, D.

    1969-01-01

    The Test Processing Integrated System is mostly composed of a CAE 9080 (equiv. S. D. S. 9300) computer which is equipped of a 100 000 samples/sec acquisition system. The System is designed for high speed data acquisition and data processing on environment tests, and also calculation of structural models. Such a digital appliance on data processing has many advantages compared to the conventional methods based on analog instruments. (author) [fr

  16. DELPHIN - a new system for testing reactor pressure vessels

    International Nuclear Information System (INIS)

    Dressler, K.

    1999-01-01

    The author discusses the question of whether a new concept for testing RPVs is necessary. He concentrates his exposition upon the RPV testing system DELPHIN recently developed by ABB, which has been successfully employed in vessel-interior tests since 1998. The new system reduces both the time required and the financial costs for RPV tests. The tests have become more efficient particularly as a result of new developments in the fields of handling machinery and microelectronics. As an example of the improved quality, the author quotes the ultrasonic system ZAQUS: thanks to the high quality of the ultrasonic data, rapid comparison with the results of earlier repreated tests on the RPV is now possible. Since problems of interpretation did not arise, the overall results in an initial application were available only two hours after the last data recording. The author's verdict: DELPHIN has successfully undergone its 'baptism by fire'; still in need of improvement, he states, is the occupany time of the pond, which is not yet as short as targeted. (orig.) [de

  17. Seismic proving test of BWR primary loop recirculation system

    International Nuclear Information System (INIS)

    Sato, H.; Shigeta, M.; Karasawa, Y.

    1987-01-01

    The seismic proving test of BWR Primary Loop Recirculation system is the second test to use the large-scale, high-performance vibration table of Tadotsu Engineering Laboratory. The purpose of this test is to prove the seismic reliability of the primary loop recirculation system (PLR), one of the most important safety components in the BWR nuclear plants, and also to confirm the adequacy of seismic analysis method used in the current seismic design. To achieve the purpose, the test was conducted under conditions and scale as near as possible to actual systems. The strength proving test was carried out with the test model mounted on the vibration table in consideration of basic design earthquake ground motions and other conditions to confirm the soundness of structure and the strength against earthquakes. Detailed analysis and analytic evaluation of the data obtained from the test was conducted to confirm the adequacy of the seismic analysis method and earthquake response analysis method used in the current seismic design. Then, on the basis of the results obtained, the seismic safety and reliability of BWR primary loop recirculation of the actual plants was fully evaluated

  18. Evaluation of the control system checkout test results for YGN 3

    International Nuclear Information System (INIS)

    Hong, Eon Young; Shon, Suk Whun; Kim, Shim Whan; Sung, Kang Sik; Seo, Jong Tae.

    1996-11-01

    During the Yonggwang Nuclear Power Plant Unit 3 (YGN3) Power Ascension Test (PAT) period, the Control System Checkout tests were performed at 10%, 20%, 50%, 80%, and 100% respectively. This test evaluates the performance of the feedwater control system, reactor regulating system, pressurizer level and pressure control system in controlling their respective parameters within specified control bands at different power levels. The first test evaluates the ability of the FWCS to control steam generator 1 and 2 water levels during steady and transient conditions. The SG level setpoint was changed from normal SG level. The FWCS no.1 and no.2 controlled the SG water level to the new setpoint within the acceptable band. The second test evaluates the ability of the reactor regulating system (RRS) to control reactor coolant system (RCS) average temperature with respect to the reference temperature. The final test evaluates the ability of all of the control systems to work in an integrated manner controlling their respective parameters while the plant is at steady state conditions. The FWCS, RRS, SBCS, PLCS control their respective parameters within the control bands. The tests performed at Unit 3 were successful by meeting all of the test acceptable criteria. The measured test data for the major plant parameters were collected and evaluated. (author). 14 tabs., 217 figs., 7 refs

  19. Test objects for evaluating the performance of radiological imaging systems. Leeds radiological test objects

    International Nuclear Information System (INIS)

    Cowen, A.R.; Clarke, O.F.; Haywood, J.M.; Parker, R.P.

    1985-01-01

    A range of test objects has been developed to assess the imaging performance of conventional and digital radiological imaging systems. These test objects have arisen as a result of involvement in both the laboratory evaluation of radiological imaging systems and the routine maintenance of such equipment in a large diagnostic radiology department. The philosophy behind the design and application of the test objects is briefly described. Particular attention is paid to the advantages of using the threshold-contrast detail-detectability technique to assess overall imaging performance. The great importance of ensuring optimum imaging performance prior to clinical acceptance is stressed. A strategy for implementing the test objects in a clinical department is present. The diagnostic information content of the clinical images which result measures the success of the quality control procedure adopted. (author)

  20. SIMS prototype System 3 test results: engineering analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  1. SIMS prototype system 3 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating is presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  2. Test specifications for the waste information and control system

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the test specifications for the testing of the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  3. Fiber Optic Telemetry System for LLL High-Voltage Test Stand

    International Nuclear Information System (INIS)

    Richter, J.P.

    1977-01-01

    This paper describes the Fiber Optic Telemetry System designed to operate in the hostile particle and electromagnetic radiation environment of the High Voltage Test Stand. It discusses system criteria, components, packaging, and performance. In all tests to date, the system exceeds its design goals with very comfortable margins. It is well advanced into the fabrication stages with all crucial components tested and only straightforward TTL (Transistor Transistor Logic) circuitry to be completed

  4. System for routine testing of self-contained and airline breathing equipment

    Energy Technology Data Exchange (ETDEWEB)

    McDermott, H.J.; Hermens, G.A.

    1980-07-01

    A system for routine testing of self-contained and airline breathing equipment, developed by Shell Oil Co., for testing breathing equipment at one of its refineries, consists of an 80 psig air supply for airline respirators; a 500-2100 psig air supply for self-contained units; a regulator test system which uses a mannequin head that simulates human inhalation and which tests the ability of the regulator to keep the mask interior at the correct positive pressure; and an exhalation valve test system which identifies a leaky or sticking valve. The testing system has been in use for about 30 mo and has led to increased acceptance of respiratory protective equipment by workers.

  5. Research on the Testing Methods for IBIS-S System

    International Nuclear Information System (INIS)

    Xing, C; Zhou, X; Wang, P; Yu, Z Q

    2014-01-01

    The basic theoretical principles and key techniques of the IBIS-S system, which is a micro-deformation monitoring system based on the techniques of GB-InSAR, are introduced. The accuracy of IBIS-S is much higher than that of traditional deformation monitoring devices, so it is necessary to test the accuracy and reliability of the system. Some comparison experiments are designed for testing the parameters provided by the manufacturer, and these tests verify the accuracy and resolution of IBIS-S. A Leica TCRP 1201 total station (with an accuracy of 1mm + 1ppm) and a stepping motor (with an accuracy of 0.001mm) are used for testing the monitoring accuracy of IBIS-S. The results from different tests show that the monitoring data of IBIS-S is very accurate and higher than the traditional total station. The results also indicate that IBIS-S can be applied in the micro-deformation projects of high-rise buildings, bridges and some other objects with a high accuracy

  6. Fuel Cell Development and Test Laboratory | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Fuel Cell Development and Test Laboratory Fuel Cell Development and Test Laboratory The Energy System Integration Facility's Fuel Cell Development and Test Laboratory supports fuel cell research and development projects through in-situ fuel cell testing. Photo of a researcher running

  7. Performance test of solar-assisted ejector cooling system

    KAUST Repository

    Huang, Bin-Juine

    2014-03-01

    A solar-assisted ejector cooling/heating system (SACH-2k) is built and test result is reported. The solar-driven ejector cooling system (ECS) is connected in series with an inverter-type air conditioner (IAC). Several advanced technologies are developed in SACH-k2, including generator liquid level control in ECS, the ECS evaporator temperature control, and optimal control of fan power in cooling tower of ECS. From the field test results, the generator liquid level control performs quite well and keeps stable performance of ejector. The ECS evaporator temperature control also performs satisfactorily to keep ejector performance normally under low or fluctuating solar radiation. The fan power control system cooling tower performs stably and reduces the power consumption dramatically without affecting the ECS performance. The test results show that the overall system COPo including power consumptions of peripheral increases from 2.94-3.3 (IAC alone) to 4.06-4.5 (SACH-k2), about 33-43%. The highest COPo is 4.5. © 2013 Elsevier Ltd and IIR. All rights reserved.

  8. The Automatic Test Features of the IDiPS Reactor Protection System

    International Nuclear Information System (INIS)

    Hur, Seop; Kim, Dong-Hoon; Hwang, In-Koo; Lee, Cheol-Kwon; Lee, Dong-Young

    2007-01-01

    The reactor protection system (RPS) is designed to minimize a propagation of abnormal or accident conditions of nuclear power plants. A digital RPS (Integrated Digital Protection System (IDiPS) RPS) is being developed in the Korea Nuclear Instrumentation and Control System (KNICS) R and D project. To make good use of the advantages of the digital technology, it is necessary to improve the reliability and availability of a system through automatic test features including an on-line testing, a self-diagnostics, an auto calibration, etc. This paper summarizes the system test strategy and the automatic test features of the IDiPS RPS

  9. A high temperature testing system for ceramic composites

    Science.gov (United States)

    Hemann, John

    1994-01-01

    Ceramic composites are presently being developed for high temperature use in heat engine and space power system applications. The operating temperature range is expected to be 1090 to 1650 C (2000 F to 3000 F). Very little material data is available at these temperatures and, therefore, it is desirable to thoroughly characterize the basic unidirectional fiber reinforced ceramic composite. This includes testing mainly for mechanical material properties at high temperatures. The proper conduct of such characterization tests requires the development of a tensile testing system includes unique gripping, heating, and strain measuring devices which require special considerations. The system also requires an optimized specimen shape. The purpose of this paper is to review various techniques for measuring displacements or strains, preferably at elevated temperatures. Due to current equipment limitations it is assumed that the specimen is to be tested at a temperature of 1430 C (2600F) in an oxidizing atmosphere. For the most part, previous high temperature material characterization tests, such as flexure and tensile tests, have been performed in inert atmospheres. Due to the harsh environment in which the ceramic specimen is to be tested, many conventional strain measuring techniques can not be applied. Initially a brief description of the more commonly used mechanical strain measuring techniques is given. Major advantages and disadvantages with their application to high temperature tensile testing of ceramic composites are discussed. Next, a general overview is given for various optical techniques. Advantages and disadvantages which are common to these techniques are noted. The optical methods for measuring strain or displacement are categorized into two sections. These include real-time techniques. Finally, an optical technique which offers optimum performance with the high temperature tensile testing of ceramic composites is recommended.

  10. Evaluation of 12 blood glucose monitoring systems for self-testing: system accuracy and measurement reproducibility.

    Science.gov (United States)

    Freckmann, Guido; Baumstark, Annette; Schmid, Christina; Pleus, Stefan; Link, Manuela; Haug, Cornelia

    2014-02-01

    Systems for self-monitoring of blood glucose (SMBG) have to provide accurate and reproducible blood glucose (BG) values in order to ensure adequate therapeutic decisions by people with diabetes. Twelve SMBG systems were compared in a standardized manner under controlled laboratory conditions: nine systems were available on the German market and were purchased from a local pharmacy, and three systems were obtained from the manufacturer (two systems were available on the U.S. market, and one system was not yet introduced to the German market). System accuracy was evaluated following DIN EN ISO (International Organization for Standardization) 15197:2003. In addition, measurement reproducibility was assessed following a modified TNO (Netherlands Organization for Applied Scientific Research) procedure. Comparison measurements were performed with either the glucose oxidase method (YSI 2300 STAT Plus™ glucose analyzer; YSI Life Sciences, Yellow Springs, OH) or the hexokinase method (cobas(®) c111; Roche Diagnostics GmbH, Mannheim, Germany) according to the manufacturer's measurement procedure. The 12 evaluated systems showed between 71.5% and 100% of the measurement results within the required system accuracy limits. Ten systems fulfilled with the evaluated test strip lot minimum accuracy requirements specified by DIN EN ISO 15197:2003. In addition, accuracy limits of the recently published revision ISO 15197:2013 were applied and showed between 54.5% and 100% of the systems' measurement results within the required accuracy limits. Regarding measurement reproducibility, each of the 12 tested systems met the applied performance criteria. In summary, 83% of the systems fulfilled with the evaluated test strip lot minimum system accuracy requirements of DIN EN ISO 15197:2003. Each of the tested systems showed acceptable measurement reproducibility. In order to ensure sufficient measurement quality of each distributed test strip lot, regular evaluations are required.

  11. 14 CFR 417.305 - Command control system testing.

    Science.gov (United States)

    2010-01-01

    ....303 are satisfied. (4) Any computing system, software, or firmware that performs a software safety... following: (i) Automatic carrier switching. For any automatic carrier switching system, the test must verify...

  12. Prototype system tests of the Belle II PXD DAQ system

    Energy Technology Data Exchange (ETDEWEB)

    Fleischer, Soeren; Gessler, Thomas; Kuehn, Wolfgang; Lange, Jens Soeren; Muenchow, David; Spruck, Bjoern [II. Physikalisches Institut, Justus-Liebig-Universitaet Giessen (Germany); Liu, Zhen' An; Xu, Hao; Zhao, Jingzhou [Institute of High Energy Physics, Chinese Academy of Sciences (China); Collaboration: II PXD Collaboration

    2012-07-01

    The data acquisition system for the Belle II DEPFET Pixel Vertex Detector (PXD) is designed to cope with a high input data rate of up to 21.6 GB/s. The main hardware component will be AdvancedTCA-based Compute Nodes (CN) equipped with Xilinx Virtex-5 FX70T FPGAs. The design for the third Compute Node generation was completed recently. The xTCA-compliant system features a carrier board and 4 AMC daughter boards. First test results of a prototype board will be presented, including tests of (a) The high-speed optical links used for data input, (b) The two 2 GB DDR2-chips on the board and (c) Output of data via ethernet, using UDP and TCP/IP with both hardware and software protocol stacks.

  13. SFR test fixture for hemispherical and hyperhemispherical camera systems

    Science.gov (United States)

    Tamkin, John M.

    2017-08-01

    Optical testing of camera systems in volume production environments can often require expensive tooling and test fixturing. Wide field (fish-eye, hemispheric and hyperhemispheric) optical systems create unique challenges because of the inherent distortion, and difficulty in controlling reflections from front-lit high resolution test targets over the hemisphere. We present a unique design for a test fixture that uses low-cost manufacturing methods and equipment such as 3D printing and an Arduino processor to control back-lit multi-color (VIS/NIR) targets and sources. Special care with LED drive electronics is required to accommodate both global and rolling shutter sensors.

  14. Data on test results of vessel cooling system of high temperature engineering test reactor

    International Nuclear Information System (INIS)

    Saikusa, Akio; Nakagawa, Shigeaki; Fujimoto, Nozomu; Tachibana, Yukio; Iyoku, Tatsuo

    2003-02-01

    High Temperature Engineering Test Reactor (HTTR) is the first graphite-moderated helium gas cooled reactor in Japan. The rise-to-power test of the HTTR started on September 28, 1999 and thermal power of the HTTR reached its full power of 30 MW on December 7, 2001. Vessel Cooling System (VCS) of the HTTR is the first Reactor Cavity Cooling System (RCCS) applied for High Temperature Gas Cooled Reactors. The VCS cools the core indirectly through the reactor pressure vessel to keep core integrity during the loss of core flow accidents such as depressurization accident. Minimum heat removal of the VCS to satisfy its safety requirement is 0.3MW at 30 MW power operation. Through the performance test of the VCS in the rise-to-power test of the HTTR, it was confirmed that the VCS heat removal at 30 MW power operation was higher than 0.3 MW. This paper shows outline of the VCS and test results on the VCS performance. (author)

  15. Molten Salt Test Loop (MSTL) system customer interface document.

    Energy Technology Data Exchange (ETDEWEB)

    Gill, David Dennis; Kolb, William J.; Briggs, Ronald D.

    2013-09-01

    The National Solar Thermal Test Facility at Sandia National Laboratories has a unique test capability called the Molten Salt Test Loop (MSTL) system. MSTL is a test capability that allows customers and researchers to test components in flowing, molten nitrate salt. The components tested can range from materials samples, to individual components such as flex hoses, ball joints, and valves, up to full solar collecting systems such as central receiver panels, parabolic troughs, or linear Fresnel systems. MSTL provides realistic conditions similar to a portion of a concentrating solar power facility. The facility currently uses 60/40 nitrate %E2%80%9Csolar salt%E2%80%9D and can circulate the salt at pressure up to 40 bar (600psi), temperature to 585%C2%B0C, and flow rate of 44-50kg/s(400-600GPM) depending on temperature. The purpose of this document is to provide a basis for customers to evaluate the applicability to their testing needs, and to provide an outline of expectations for conducting testing on MSTL. The document can serve as the basis for testing agreements including Work for Others (WFO) and Cooperative Research and Development Agreements (CRADA). While this document provides the basis for these agreements and describes some of the requirements for testing using MSTL and on the site at Sandia, the document is not sufficient by itself as a test agreement. The document, however, does provide customers with a uniform set of information to begin the test planning process.

  16. Integration test effort in SAP R/3 systems

    NARCIS (Netherlands)

    Griend, van de P.A.; Kusters, R.J.

    2012-01-01

    This paper describes an experimental approach towards the definition of a metric for integration test effort based on enterprise resource planning (ERP) system logs. By nature, ERP systems are complex. After implementing an ERP-system, it is typically subjected to many, and often concurrent,

  17. Preliminary Tests of a New Low-Cost Photogrammetric System

    Science.gov (United States)

    Santise, M.; Thoeni, K.; Roncella, R.; Sloan, S. W.; Giacomini, A.

    2017-11-01

    This paper presents preliminary tests of a new low-cost photogrammetric system for 4D modelling of large scale areas for civil engineering applications. The system consists of five stand-alone units. Each of the units is composed of a Raspberry Pi 2 Model B (RPi2B) single board computer connected to a PiCamera Module V2 (8 MP) and is powered by a 10 W solar panel. The acquisition of the images is performed automatically using Python scripts and the OpenCV library. Images are recorded at different times during the day and automatically uploaded onto a FTP server from where they can be accessed for processing. Preliminary tests and outcomes of the system are discussed in detail. The focus is on the performance assessment of the low-cost sensor and the quality evaluation of the digital surface models generated by the low-cost photogrammetric systems in the field under real test conditions. Two different test cases were set up in order to calibrate the low-cost photogrammetric system and to assess its performance. First comparisons with a TLS model show a good agreement.

  18. PRELIMINARY TESTS OF A NEW LOW-COST PHOTOGRAMMETRIC SYSTEM

    Directory of Open Access Journals (Sweden)

    M. Santise

    2017-11-01

    Full Text Available This paper presents preliminary tests of a new low-cost photogrammetric system for 4D modelling of large scale areas for civil engineering applications. The system consists of five stand-alone units. Each of the units is composed of a Raspberry Pi 2 Model B (RPi2B single board computer connected to a PiCamera Module V2 (8 MP and is powered by a 10 W solar panel. The acquisition of the images is performed automatically using Python scripts and the OpenCV library. Images are recorded at different times during the day and automatically uploaded onto a FTP server from where they can be accessed for processing. Preliminary tests and outcomes of the system are discussed in detail. The focus is on the performance assessment of the low-cost sensor and the quality evaluation of the digital surface models generated by the low-cost photogrammetric systems in the field under real test conditions. Two different test cases were set up in order to calibrate the low-cost photogrammetric system and to assess its performance. First comparisons with a TLS model show a good agreement.

  19. 46 CFR 122.320 - Steering gear, controls, and communication system tests.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Steering gear, controls, and communication system tests... communication system tests. The master of a vessel shall have examined and tested the steering gear, signaling whistle, propulsion controls, and communication systems of the vessel prior to getting underway for a...

  20. Impact Testing of Orbiter Thermal Protection System Materials

    Science.gov (United States)

    Kerr, Justin

    2006-01-01

    This viewgraph presentation reviews the impact testing of the materials used in designing the shuttle orbiter thermal protection system (TPS). Pursuant to the Columbia Accident Investigation Board recommendations a testing program of the TPS system was instituted. This involved using various types of impactors in different sizes shot from various sizes and strengths guns to impact the TPS tiles and the Leading Edge Structural Subsystem (LESS). The observed damage is shown, and the resultant lessons learned are reviewed.

  1. Transformation of lettuce (Lactuca sativa) mediated by Agrobacterium tumefaciens.

    Science.gov (United States)

    Michelmore, R; Marsh, E; Seely, S; Landry, B

    1987-12-01

    Lactuca sativa can be routinely transformed using Ti plasmids of Agrobacterium tumefaciens containing a chimeric kanamycin resistance gene (NOS.NPTII.NOS). Critical experimental variables were plant genotype, bacterial concentration, presence of a nurse culture and timing of transfers between tissue culture media. Transformation was confirmed by the ability to callus and root in the presence of kanamycin, nopaline production, and by hybridization in Southern blots. Transformation has been achieved with several Ti vectors. Several hundred transformed plants have been regenerated. Kanamycin resistance was inherited monogenically. Homozygotes can be selected by growing R2 seedlings on media containing G418.

  2. Interconnection test framework for the CMS level-1 trigger system

    International Nuclear Information System (INIS)

    Hammer, J.; Magrans de Abril, M.; Wulz, C.E.

    2012-01-01

    The Level-1 Trigger Control and Monitoring System is a software package designed to configure, monitor and test the Level-1 Trigger System of the Compact Muon Solenoid (CMS) experiment at CERN's Large Hadron Collider. It is a large and distributed system that runs over 50 PCs and controls about 200 hardware units. The objective of this paper is to describe and evaluate the architecture of a distributed testing framework - the Interconnection Test Framework (ITF). This generic and highly flexible framework for creating and executing hardware tests within the Level-1 Trigger environment is meant to automate testing of the 13 major subsystems interconnected with more than 1000 links. Features include a web interface to create and execute tests, modeling using finite state machines, dependency management, automatic configuration, and loops. Furthermore, the ITF will replace the existing heterogeneous testing procedures and help reducing both maintenance and complexity of operation tasks. (authors)

  3. Seismic qualification of SPX1 shutdown systems - tests and calculations

    International Nuclear Information System (INIS)

    Brochard, D.; Buland, P.

    1988-01-01

    The SUPERPHENIX 1 shutdown system is composed of two main systems: the Complementary Shutdown System SAC (Systeme d'Arret Complementaire) and the Primary Shutdown System (SCP) (Systeme de Commande Principal). In case of a seismic event, the insertability of the different shutdown systems has to be demonstrated. Tests have been performed on the SAC and have shown that this system was not sensitive to the seismic excitation (the drop time increases of 10% at SSE level). For the SCP, as an analytical demonstration was felt difficult to achieve, it was decided to perform a full scale testing program. These tests have been performed for the two types of SCP which are present in Superphenix: SCP 1 (Creusot Loire design), SCP 2 (Novatome design). As there was no existing facility in France to test this kind of slender structure (21 metres high) a new facility named VESUBIE was designed and installed in an existing pit located at the Saclay nuclear research center. The objectives of the tests were the following: to demonstrate insertability of control rod; to demonstrate absence of seismic induced damage to the SCP; to measure increase of scram time; to measure seismic induced stresses; to obtain data for code correlation. After completion of the tests, measurements have been correlated with results obtained from a non-linear finite element model. Time history correlations were achieved for SCP 1. Afterwards a calculation was performed in hot condition to find if there was some effect of temperature on SCP seismic response. 2 refs, 8 figs

  4. Recent Ground Hold and Rapid Depressurization Testing of Multilayer Systems

    Science.gov (United States)

    Johnson, Wesley L.

    2014-01-01

    In the development of flight insulation systems for large cryogenic orbital storage (spray on foam and multilayer insulation), testing need include all environments that are experienced during flight. While large efforts have been expended on studying, bounding, and modeling the orbital performance of the insulation systems, little effort has been expended on the ground hold and ascent phases of a mission. Historical cryogenic in-space systems that have flown have been able to ignore these phases of flight due to the insulation system being within a vacuum jacket. In the development phase of the Nuclear Mars Vehicle and the Shuttle Nuclear Vehicle, several insulation systems were evaluated for the full mission cycle. Since that time there had been minimal work on these phases of flight until the Constellation program began investigating cryogenic service modules and long duration upper stages. With the inception of the Cryogenic Propellant Storage and Transfer Technology Demonstration Mission, a specific need was seen for the data and as such, several tests were added to the Cryogenic Boil-off Reduction System liquid hydrogen test matrix to provide more data on a insulation system. Testing was attempted with both gaseous nitrogen (GN2) and gaseous helium (GHe) backfills. The initial tests with nitrogen backfill were not successfully completed due to nitrogen liquefaction and solidification preventing the rapid pumpdown of the vacuum chamber. Subsequent helium backfill tests were successful and showed minimal degradation. The results are compared to the historical data.

  5. 21 CFR 862.1090 - Angiotensin converting enzyme (A.C.E.) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Angiotensin converting enzyme (A.C.E.) test system... Test Systems § 862.1090 Angiotensin converting enzyme (A.C.E.) test system. (a) Identification. An angiotensin converting enzyme (A.C.E.) test system is a device intended to measure the activity of angiotensin...

  6. Operation of the cryogenic system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Chronis, W.C.; Slack, D.S.

    1987-01-01

    The cryogenic system for the Mirror Fusion Test Facility (MFTF) at Lawrence Livermore National Laboratory (LLNL) was designed to cool the entire MFTF-B system from ambient to operating temperature in less than 10 days. The system was successfully operated in the recent plant and capital equipment (PACE) acceptance tests, and results from these tests helped us correct problem areas and improve the system

  7. PHYSICOCHEMICAL AND ANTIMICROBIAL PROPERTIES OF ...

    African Journals Online (AJOL)

    Preferred Customer

    S. mahagoni seeds were tested against 6 pathogenic bacteria and fungi each by the ... almost near to the reported values 29.1% [29] and 47.5% [6], respectively. ..... The results were compared with those of kanamycin as a standard antibiotic. ... fungi. Methanol extract did not show any activity against Trichoderma viride and ...

  8. Design and construction of the SSCL magnet test laboratory cryogenic systems

    International Nuclear Information System (INIS)

    Freeman, M.A.; Kobel, T.A.

    1992-01-01

    The intent of this document is to provide a brief summary of the execution, by Process Systems International, Inc. (PSI), of the Design and Construction of the SSCL Magnet Test Laboratory Cryogenic Systems. This $30 million project requires the expenditure of over 200,000 manhours and the procurement of $17 million in materials within a two year period. SSC magnets will be performance tested at the Magnet Test Laboratory (MTL) and the Accelerator System String Test (ASST) facility under conditions simulating the environment of the SSC main ring. The cryogenic system consists of test stands (five for MTL, one for ASST) and the associated equipment including cryogenic storage, purification, thermal conditioning, and helium refrigeration necessary to support the test program

  9. Double Retort System for Materials Compatibility Testing

    International Nuclear Information System (INIS)

    V. Munne; EV Carelli

    2006-01-01

    With Naval Reactors (NR) approval of the Naval Reactors Prime Contractor Team (NRPCT) recommendation to develop a gas cooled reactor directly coupled to a Brayton power conversion system as the Space Nuclear Power Plant (SNPP) for Project Prometheus (References a and b) there was a need to investigate compatibility between the various materials to be used throughout the SNPP. Of particular interest was the transport of interstitial impurities from the nickel-base superalloys, which were leading candidates for most of the piping and turbine components to the refractory metal alloys planned for use in the reactor core. This kind of contamination has the potential to affect the lifetime of the core materials. This letter provides technical information regarding the assembly and operation of a double retort materials compatibility testing system and initial experimental results. The use of a double retort system to test materials compatibility through the transfer of impurities from a source to a sink material is described here. The system has independent temperature control for both materials and is far less complex than closed loops. The system is described in detail and the results of three experiments are presented

  10. Regulation on control systems tests

    International Nuclear Information System (INIS)

    Grau, J.; Navarro, J.M.

    1978-01-01

    Requirements under regulation applicable to the testing of control systems and controlled equipments in the case of USA nuclear projects are examined. They are reviewed, in particular, the following standards and criteria: 10 Code of Federal Regulations 50, Appendix A, General Design Criteria 20 and 21; IEEE Standards 279 and 308; IEEE Standard 338; US Regulatory Guides 1.22 and 1.118.(J.E.de C.)

  11. Computer-controlled environmental test systems - Criteria for selection, installation, and maintenance.

    Science.gov (United States)

    Chapman, C. P.

    1972-01-01

    Applications for presently marketed, new computer-controlled environmental test systems are suggested. It is shown that capital costs of these systems follow an exponential cost function curve that levels out as additional applications are implemented. Some test laboratory organization changes are recommended in terms of new personnel requirements, and facility modification are considered in support of a computer-controlled test system. Software for computer-controlled test systems are discussed, and control loop speed constraints are defined for real-time control functions. Suitable input and output devices and memory storage device tradeoffs are also considered.

  12. W-026, acceptance test report manipulator system

    International Nuclear Information System (INIS)

    Watson, T.L.

    1997-01-01

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests

  13. 21 CFR 862.1160 - Bicarbonate/carbon dioxide test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Bicarbonate/carbon dioxide test system. 862.1160 Section 862.1160 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES CLINICAL CHEMISTRY AND CLINICAL TOXICOLOGY DEVICES Clinical Chemistry Test Systems § 862.1160 Bicarbonate/carbon dioxide...

  14. Towards a foundation for holistic power system validation and testing

    DEFF Research Database (Denmark)

    Blank, M.; Lehnhoff, S.; Heussen, Kai

    2016-01-01

    , and intelligent solutions for system operation have transformed the power system into a smart grid. To support the development process of smart grid solutions on system level they have to be tested in a holistic manner covering the multi-domain aspect of a such complex systems. This paper introduces the concept...... of holistic power system testing and discuss first steps towards a corresponding methodology that is being developed in the European ERIGrid research infrastructure project....

  15. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the test mixer pump currently installed in Tank 241-SY-101. The purpose of this acceptance test is to verify the strength of the containment bag and bag bottom cinching mechanism. It is postulated that 68 gallons of waste could be trapped inside the pump internals. The bag must be capable of supporting this waste if it shakes loose and drains to the bottom of the bag after the bag bottom has been cinched closed. This acceptance test was performed at the Maintenance and Storage Facility (MASF) Facility in the 400 area on January 23, 1995. The bag assembly supported the weight of 920 kg (2,020 lbs) of water with no leakage or damage to the bag. This value meets the acceptance criteria of 910 kg of water and therefore the results were found to be acceptable. The maximum volume of liquid expected to be held up in the pump internals is 258 L (68 gallons), which corresponds to 410 kg. This test weight gives just over a safety factor of 2. The bag also supported a small shock load while it was filled with water when the crane hoisted the bag assembly up and down. Based on the strength rating of the bag components, the bag assembly should support 2--3 times the test weight of 910 kg

  16. Flight Test of an Intelligent Flight-Control System

    Science.gov (United States)

    Davidson, Ron; Bosworth, John T.; Jacobson, Steven R.; Thomson, Michael Pl; Jorgensen, Charles C.

    2003-01-01

    The F-15 Advanced Controls Technology for Integrated Vehicles (ACTIVE) airplane (see figure) was the test bed for a flight test of an intelligent flight control system (IFCS). This IFCS utilizes a neural network to determine critical stability and control derivatives for a control law, the real-time gains of which are computed by an algorithm that solves the Riccati equation. These derivatives are also used to identify the parameters of a dynamic model of the airplane. The model is used in a model-following portion of the control law, in order to provide specific vehicle handling characteristics. The flight test of the IFCS marks the initiation of the Intelligent Flight Control System Advanced Concept Program (IFCS ACP), which is a collaboration between NASA and Boeing Phantom Works. The goals of the IFCS ACP are to (1) develop the concept of a flight-control system that uses neural-network technology to identify aircraft characteristics to provide optimal aircraft performance, (2) develop a self-training neural network to update estimates of aircraft properties in flight, and (3) demonstrate the aforementioned concepts on the F-15 ACTIVE airplane in flight. The activities of the initial IFCS ACP were divided into three Phases, each devoted to the attainment of a different objective. The objective of Phase I was to develop a pre-trained neural network to store and recall the wind-tunnel-based stability and control derivatives of the vehicle. The objective of Phase II was to develop a neural network that can learn how to adjust the stability and control derivatives to account for failures or modeling deficiencies. The objective of Phase III was to develop a flight control system that uses the neural network outputs as a basis for controlling the aircraft. The flight test of the IFCS was performed in stages. In the first stage, the Phase I version of the pre-trained neural network was flown in a passive mode. The neural network software was running using flight data

  17. Performance testing of real-time AI systems using the activation framework

    International Nuclear Information System (INIS)

    Becker, L.; Duckworth, J.; Laznovsky, A.; Green, P.

    1992-01-01

    This paper describes methods for automated performance testing of real-time artificial intelligence systems using the Activation Framework software development tool. The Activation Framework is suitable for applications such as the diagnosis of power system failures, which require the interpretation of large volumes of data in real-time. The Activation Framework consists of tools for compiling groups of Expert Systems rules into executable code modules, for automatically generating code modules from high level system configuration descriptions, and for automatically generating command files for program compilation and linking. It includes an operating system environment which provides the code which is common from one real-time AI applications to the next. It also includes mechanisms, described here, for automatic performance testing. The principal emphasis of this paper is on a rule based language which is used to capture performance specifications. This specification is compiled into code modules which are used to automatically test the system. This testing can validate that the system meets performance requirements during development and after maintenance. A large number of tests can be randomly generated and executed and the correctness of the outputs automatically validated. The paper also describes graph directed testing methods to minimize the number of test runs required

  18. Power Systems Development Facility Gasification Test Campaing TC18

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2005-08-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device (PCD), advanced syngas cleanup systems, and high pressure solids handling systems. This report details Test Campaign TC18 of the PSDF gasification process. Test campaign TC18 began on June 23, 2005, and ended on August 22, 2005, with the gasifier train accumulating 1,342 hours of operation using Powder River Basin (PRB) subbituminous coal. Some of the testing conducted included commissioning of a new recycle syngas compressor for gasifier aeration, evaluation of PCD filter elements and failsafes, testing of gas cleanup technologies, and further evaluation of solids handling equipment. At the conclusion of TC18, the PSDF gasification process had been operated for more than 7,750 hours.

  19. Estimation of component failure probability from masked binomial system testing data

    International Nuclear Information System (INIS)

    Tan Zhibin

    2005-01-01

    The component failure probability estimates from analysis of binomial system testing data are very useful because they reflect the operational failure probability of components in the field which is similar to the test environment. In practice, this type of analysis is often confounded by the problem of data masking: the status of tested components is unknown. Methods in considering this type of uncertainty are usually computationally intensive and not practical to solve the problem for complex systems. In this paper, we consider masked binomial system testing data and develop a probabilistic model to efficiently estimate component failure probabilities. In the model, all system tests are classified into test categories based on component coverage. Component coverage of test categories is modeled by a bipartite graph. Test category failure probabilities conditional on the status of covered components are defined. An EM algorithm to estimate component failure probabilities is developed based on a simple but powerful concept: equivalent failures and tests. By simulation we not only demonstrate the convergence and accuracy of the algorithm but also show that the probabilistic model is capable of analyzing systems in series, parallel and any other user defined structures. A case study illustrates an application in test case prioritization

  20. Operational test report - Project W-320 cathodic protection systems

    International Nuclear Information System (INIS)

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  1. Seismic fragility test of a 6-inch diameter pipe system

    International Nuclear Information System (INIS)

    Chen, W.P.; Onesto, A.T.; DeVita, V.

    1987-02-01

    This report contains the test results and assessments of seismic fragility tests performed on a 6-inch diameter piping system. The test was funded by the US Nuclear Regulatory Commission (NRC) and conducted by ETEC. The objective of the test was to investigate the ability of a representative nuclear piping system to withstand high level dynamic seismic and other loadings. Levels of loadings achieved during seismic testing were 20 to 30 times larger than normal elastic design evaluations to ASME Level D limits would permit. Based on failure data obtained during seismic and other dynamic testing, it was concluded that nuclear piping systems are inherently able to withstand much larger dynamic seismic loadings than permitted by current design practice criteria or predicted by the probabilistic risk assessment (PRA) methods and several proposed nonlinear methods of failure analysis

  2. Uncertainty management in knowledge based systems for nondestructive testing-an example from ultrasonic testing

    International Nuclear Information System (INIS)

    Rajagopalan, C.; Kalyanasundaram, P.; Baldev Raj

    1996-01-01

    The use of fuzzy logic, as a framework for uncertainty management, in a knowledge-based system (KBS) for ultrasonic testing of austenitic stainless steels is described. Parameters that may contain uncertain values are identified. Methodologies to handle uncertainty in these parameters using fuzzy logic are detailed. The overall improvement in the performance of the knowledge-based system after incorporating fuzzy logic is discussed. The methodology developed being universal, its extension to other KBS for nondestructive testing and evaluation is highlighted. (author)

  3. KE basin recirculation/skimmer/IX systems restart acceptance test report

    International Nuclear Information System (INIS)

    Derosa, D.C.

    1996-01-01

    The 105 KE Basin Recirculation System and Skimmer Loop have been upgraded to provide the flexibility to run the Ion Exchange Modules on either system to support spent fuel removal for the Spent Nuclear Fuel Project. This Acceptance Test Report Provides the documentation of the leak Testing for the construction work associated with the IXM inlet and outlet piping, places the cartridge filters back in service and provides the functional testing of the IXM's on the recirculation and skimmer systems

  4. System Description of the Electrical Power Supply System for the ATLAS Integral Test Loop

    International Nuclear Information System (INIS)

    Moon, S. K.; Park, J. K.; Kim, Y. S.; Song, C. H.; Baek, W. P.

    2007-02-01

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), is constructed by Thermal-Hydraulics Safety Research Team in Korea Atomic Energy Research Institute (KAERI). The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400. This report describes the design and technical specifications of the electrical power supply system which supplies the electrical powers to core heater rods, other heaters, various pumps and other systems. The electrical power supply system had acquired the final approval on the operation from the Korea Electrical Safety Corporation. During performance tests for the operation and control, the electrical power supply system showed completely acceptable operation and control performance

  5. Automation of testing the metrological reliability of nondestructive control systems

    International Nuclear Information System (INIS)

    Zhukov, Yu.A.; Isakov, V.B.; Karlov, Yu.K.; Kovalevskij, Yu.A.

    1987-01-01

    Opportunities of microcomputers are used to solve the problem of testing control-measuring systems. Besides the main program the program of data processing when characterizing the nondestructive control systems is written in the microcomputer. The program includes two modules. The first module contains tests-programs, by which accuracy of functional elements of the microcomputer and interface elements with issuing a message to the operator on readiness of the elements for operation and failure of a certain element are determined. The second module includes: calculational programs when determining metrological reliability of measuring channel reliability, a calculational subprogram for random statistical measuring error, time instability and ''dead time''. Automation of testing metrological reliability of the nondestructive control systems increases reliability of determining metrological parameters and reduces time of system testing

  6. Software design of an auto-testing system for CAMAC modules

    International Nuclear Information System (INIS)

    Zhang Hao; Xu Jiajun

    1999-01-01

    The author introduces one of software methods of how to get a PC graphic interface operation when a MS-DOS driver is the only possible copy for the device. Human-machine interactive graphic interface is more popular nowadays since it has rich pages and comfortable input-output operations. First step is to set a data exchange between MS-DOS and MS-Windows through a interrupt service. Second step is to program a dynamic link library which VB can invoke. VBX control is possible to extend the system functions. The testing system can test main performances automatically with CAMAC modules of IDIM, IDOM, PSC, SAM, and 3016. It seems the better way to test the linearity, AC correction and so on. The testing system proves to be usable in maintaining CAMAC modules of BEPC control system

  7. Uncovering Bugs in Distributed Storage Systems during Testing (not in Production!)

    OpenAIRE

    Deligiannis, P; McCutchen, M; Thomson, P; Chen, S; Donaldson, AF; Erickson, J; Huang, C; Lal, A; Mudduluru, R; Qadeer, S; Schulte, W

    2016-01-01

    Testing distributed systems is challenging due to multiple sources of nondeterminism. Conventional testing techniques, such as unit, integration and stress testing, are ineffective in preventing serious but subtle bugs from reaching production. Formal techniques, such as TLA+, can only verify high-level specifications of systems at the level of logic-based models, and fall short of checking the actual executable code. In this paper, we present a new methodology for testing distributed systems...

  8. Mars Science Laboratory Rover System Thermal Test

    Science.gov (United States)

    Novak, Keith S.; Kempenaar, Joshua E.; Liu, Yuanming; Bhandari, Pradeep; Dudik, Brenda A.

    2012-01-01

    On November 26, 2011, NASA launched a large (900 kg) rover as part of the Mars Science Laboratory (MSL) mission to Mars. The MSL rover is scheduled to land on Mars on August 5, 2012. Prior to launch, the Rover was successfully operated in simulated mission extreme environments during a 16-day long Rover System Thermal Test (STT). This paper describes the MSL Rover STT, test planning, test execution, test results, thermal model correlation and flight predictions. The rover was tested in the JPL 25-Foot Diameter Space Simulator Facility at the Jet Propulsion Laboratory (JPL). The Rover operated in simulated Cruise (vacuum) and Mars Surface environments (8 Torr nitrogen gas) with mission extreme hot and cold boundary conditions. A Xenon lamp solar simulator was used to impose simulated solar loads on the rover during a bounding hot case and during a simulated Mars diurnal test case. All thermal hardware was exercised and performed nominally. The Rover Heat Rejection System, a liquid-phase fluid loop used to transport heat in and out of the electronics boxes inside the rover chassis, performed better than predicted. Steady state and transient data were collected to allow correlation of analytical thermal models. These thermal models were subsequently used to predict rover thermal performance for the MSL Gale Crater landing site. Models predict that critical hardware temperatures will be maintained within allowable flight limits over the entire 669 Sol surface mission.

  9. Pilot-scale incineration testing of an oxygen-enhanced combustion system

    International Nuclear Information System (INIS)

    Waterland, L.R.; Lee, J.W.; Staley, L.J.

    1989-01-01

    This paper discusses a series of demonstration tests of the American Combustion, Inc., Thermal Destruction System performed under the Superfund innovative technology evaluation (SITE) program. This oxygen-enhanced combustion system was retrofit to the pilot-scale rotary kiln incinerator at EPA's Combustion Research Facility. This system's performance was tested firing contaminated soil from the Stringfellow Superfund Site, both alone and mixed with a hazardous coal tar waste (decanter tank tar sludge form coking operations - K087). Comparative performance with conventional incinerator operation was tested. Test results show that compliance with the hazardous waste incinerator performance standards of 99.99 percent principal organic hazardous constituent (POHC) destruction and removal efficiency (DRE) and particulate emissions of less than 180 mg/dscm at 7 percent O 2 was achieved for all tests. The Pyretron oxygen-enhanced combustion system allowed in-compliance operation at double the mixed waste feedrate possible with conventional incineration, and with a 60 percent increase in charge weight than possible with conventional incineration

  10. An Integration Testing Facility for the CERN Accelerator Controls System

    CERN Document Server

    Stapley, N; Bau, J C; Deghaye, S; Dehavay, C; Sliwinski, W; Sobczak, M

    2009-01-01

    A major effort has been invested in the design, development, and deployment of the LHC Control System. This large control system is made up of a set of core components and dependencies, which although tested individually, are often not able to be tested together on a system capable of representing the complete control system environment, including hardware. Furthermore this control system is being adapted and applied to CERN's whole accelerator complex, and in particular for the forthcoming renovation of the PS accelerators. To ensure quality is maintained as the system evolves, and toimprove defect prevention, the Controls Group launched a project to provide a dedicated facility for continuous, automated, integration testing of its core components to incorporate into its production process. We describe the project, initial lessons from its application, status, and future directions.

  11. Chromosome-Based Genetic Complementation System for Xylella fastidiosa▿

    OpenAIRE

    Matsumoto, Ayumi; Young, Glenn M.; Igo, Michele M.

    2009-01-01

    Xylella fastidiosa is a xylem-limited, gram-negative bacterium that causes Pierce's disease of grapevine. Here, we describe the construction of four vectors that facilitate the insertion of genes into a neutral site (NS1) in the X. fastidiosa chromosome. These vectors carry a colE1-like (pMB1) replicon and DNA sequences from NS1 flanking a multiple-cloning site and a resistance marker for one of the following antibiotics: chloramphenicol, erythromycin, gentamicin, or kanamycin. In X. fastidio...

  12. Piezoelectric materials involved in road traffic applications test system

    International Nuclear Information System (INIS)

    Vazquez Rodriguez, M.; Jimenez Martinez, F.; Frutos, J. de

    2011-01-01

    The test bench system described in this paper performs experiments on piezoelectric materials used in road traffic applications, covering a range between 14 and 170 km/h, which is considered enough for testing under standard traffic conditions. A software has been developed to control the three phase induction motor driver and to acquire all the measurement data of the piezoelectric materials. The mass over each systems axis can be selected, with a limit of 60 kg over each wheel. The test bench is used to simulate the real behaviour of buried piezoelectric cables in road traffic applications for both light and heavy vehicles. This new test bed system is a powerful research tool and can be applied to determine the optimal installation and configuration of the piezoelectric cable sensors and opens a new field of research: the study of energy harvesting techniques based on piezoelectric materials. (Author) 10 refs.

  13. Spaceport Command and Control System Automation Testing

    Science.gov (United States)

    Plano, Tom

    2017-01-01

    The goal of automated testing is to create and maintain a cohesive infrastructure of robust tests that could be run independently on a software package in its entirety. To that end, the Spaceport Command and Control System (SCCS) project at the National Aeronautics and Space Administration's (NASA) Kennedy Space Center (KSC) has brought in a large group of interns to work side-by-side with full time employees to do just this work. Thus, our job is to implement the tests that will put SCCS through its paces.

  14. Computer-Aided System of Virtual Testing of Gas Turbine Engines

    Directory of Open Access Journals (Sweden)

    Rybakov Viktor N.

    2016-01-01

    Full Text Available The article describes the concept of a virtual lab that includes subsystem of gas turbine engine simulation, subsystem of experiment planning, subsystem of measurement errors simulation, subsystem of simulator identification and others. The basis for virtual lab development is the computer-aided system of thermogasdynamic research and analysis “ASTRA”. The features of gas turbine engine transient modes simulator are described. The principal difference between the simulators of transient and stationary modes of gas turbine engines is that the energy balance of the compressor and turbine becomes not applicable. The computer-aided system of virtual gas turbine engine testing was created using the developed transient modes simulator. This system solves the tasks of operational (throttling, speed, climatic, altitude characteristics calculation, analysis of transient dynamics and selection of optimal control laws. Besides, the system of virtual gas turbine engine testing is a clear demonstration of gas turbine engine working process and the regularities of engine elements collaboration. The interface of the system of virtual gas turbine engine testing is described in the article and some screenshots of the interface elements are provided. The developed system of virtual gas turbine engine testing provides means for reducing the laboriousness of gas turbine engines testing. Besides, the implementation of this system in the learning process allows the diversification of lab works and therefore improve the quality of training.

  15. Spent Fuel Test - Climax data acquisition system operations manual

    International Nuclear Information System (INIS)

    Nyholm, R.A.

    1983-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of the retrievable, deep geologic storage of commercially generated, spent nuclear reactor fuel in granite rock. Eleven spent fuel assemblies, together with 6 electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978, Lawrence Livermore National Laboratory (LLNL) secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. The multi-year duration test is located in a remote area and is unattended much of the time. An extensive array of radiological safety and geotechnical instrumentation is deployed to monitor the test performance. A dual minicomputer-based data acquisition system (DAS) collects and processes data from more than 900 analog instruments. This report documents the software element of the LLNL developed SFT-C Data Acquisition System. It defines the operating system and hardware interface configurations, the special applications software and data structures, and support software

  16. Reliability demonstration test for load-sharing systems with exponential and Weibull components.

    Directory of Open Access Journals (Sweden)

    Jianyu Xu

    Full Text Available Conducting a Reliability Demonstration Test (RDT is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn't yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics.

  17. 14 CFR 25.952 - Fuel system analysis and test.

    Science.gov (United States)

    2010-01-01

    ... using the airplane fuel system or a test article that reproduces the operating characteristics of the... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.952 Fuel system...

  18. TREAT [Transient Reactor Test Facility] reactor control rod scram system simulations and testing

    International Nuclear Information System (INIS)

    Solbrig, C.W.; Stevens, W.W.

    1990-01-01

    Air cylinders moving heavy components (100 to 300 lbs) at high speeds (above 300 in/sec) present a formidable end-cushion-shock problem. With no speed control, the moving components can reach over 600 in/sec if the air cylinder has a 5 ft stroke. This paper presents an overview of a successful upgrade modification to an existing reactor control rod drive design using a computer model to simulate the modified system performance for system design analysis. This design uses a high speed air cylinder to rapidly insert control rods (278 lb moved 5 ft in less than 300 msec) to scram an air-cooled test reactor. Included is information about the computer models developed to simulate high-speed air cylinder operation and a unique new speed control and end cushion design. A patent application is pending with the US Patent ampersand Trade Mark Office for this system (DOE case number S-68,622). The evolution of the design, from computer simulations thru operational testing in a test stand (simulating in-reactor operating conditions) to installation and use in the reactor, is also described. 6 figs

  19. Extreme loads seismic testing of conduit systems

    International Nuclear Information System (INIS)

    Howard, G.E.; Ibanez, P.; Harrison, S.; Shi, Z.T.

    1991-01-01

    Rigid steel conduit (thin-wall tubes with threaded connections) containing electrical cabling are a common feature in nuclear power plants. Conduit systems are in many cases classified in U.S.A. practice as Seismic Category I structures. this paper summarizes results and others aspects of a dynamic test program conducted to investigate conduit systems seismic performance under three-axis excitation for designs representative at a nuclear power plant sited near Ft. Worth, Texas (a moderate seismic zone), with a Safe Shutdown Earthquake (SSE) of 0.12 g. Test specimens where subjected to postulated seismic events, including excitation well in excess of Safe Shutdown Earthquake events typical for U.S.A. nuclear power stations. A total of 18 conduit systems of 9-meter nominal lengths were shake table mounted and subjected to a variety of tests. None of the specimens suffered loss of load capacity when subjected to a site-enveloping Safe Shutdown Earthquake (SSE). Clamp/attachment hardware failures only began to occur when earthquake input motion was scaled upward to minimum values of 2.3-4.6 times site enveloping SSE response spectra. Tensile and/or shear failure of clamp attachment bolts or studs was the failure mode in all case in which failure was induced. (author)

  20. Acceptance Test Procedure: SY101 air pallet system

    International Nuclear Information System (INIS)

    Koons, B.M.

    1995-01-01

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose

  1. Automatic testing technologies for I and C systems for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshida, Motoko; Sugio, Takayuki; Konishi, Tadao

    2014-01-01

    With the aim of enhancing the global competitiveness of instrumentation and control (I and C) systems for nuclear power plants, Toshiba has been making efforts to reduce the worker hours required for the testing of such systems and improve the quality of the tests. Display screen tests, which include many routine, repetitive tests and manual tests requiring a large number of operators to monitor multiple screen displays of the I and C system, are an essential element of the testing process. The introduction of automatic testing technologies is expected to substantially improve the efficiency of such display screen tests. We have now developed automatic testing technologies for display screen tests that can be applied without the need to change the I and C system. These technologies contribute to both the reduction of worker hours for testing and improvement of the quality of the tests. (author)

  2. Statistical Requirements For Pass-Fail Testing Of Contraband Detection Systems

    International Nuclear Information System (INIS)

    Gilliam, David M.

    2011-01-01

    Contraband detection systems for homeland security applications are typically tested for probability of detection (PD) and probability of false alarm (PFA) using pass-fail testing protocols. Test protocols usually require specified values for PD and PFA to be demonstrated at a specified level of statistical confidence CL. Based on a recent more theoretical treatment of this subject [1], this summary reviews the definition of CL and provides formulas and spreadsheet functions for constructing tables of general test requirements and for determining the minimum number of tests required. The formulas and tables in this article may be generally applied to many other applications of pass-fail testing, in addition to testing of contraband detection systems.

  3. Development of a high efficiency integration system and promoter library for rapid modification of Pseudomonas putida KT2440

    Energy Technology Data Exchange (ETDEWEB)

    Elmore, Joshua R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Biosciences Division; Furches, Anna [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Biosciences Division; Wolff, Gara N. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Biosciences Division; Gorday, Kent [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Biosciences Division; Guss, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Biosciences Division

    2017-04-15

    Pseudomonas putida strains are highly robust bacteria known for their ability to efficiently utilize a variety of carbon sources, including aliphatic and aromatic hydrocarbons. Recently, P. putida has been engineered to valorize the lignin stream of a lignocellulosic biomass pretreatment process. Nonetheless, when compared to platform organisms such as Escherichia coli, the toolkit for engineering P. putida is underdeveloped. Heterologous gene expression in particular is problematic. Plasmid instability and copy number variance provide challenges for replicative plasmids, while use of homologous recombination for insertion of DNA into the chromosome is slow and laborious. Furthermore, heterologous expression efforts to date typically rely on overexpression of exogenous pathways using a handful of poorly characterized promoters. In order to improve the P. putida toolkit, we developed a rapid genome integration system using the site-specific recombinase from bacteriophage Bxb1 to enable rapid, high efficiency integration of DNA into the P. putida chromosome. We also developed a library of synthetic promoters with various UP elements, -35 sequences, and -10 sequences, as well as different ribosomal binding sites. We tested these promoters using a fluorescent reporter gene, mNeonGreen, to characterize the strength of each promoter, and identified UP-element-promoter-ribosomal binding sites combinations capable of driving a ~150-fold range of protein expression levels. One additional integrating vector was developed that confers more robust kanamycin resistance when integrated at single copy into the chromosome. This genome integration and reporter systems are extensible for testing other genetic parts, such as examining terminator strength, and will allow rapid integration of heterologous pathways for metabolic engineering.

  4. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  5. Software design of a auto-testing system for CAMAC modules

    International Nuclear Information System (INIS)

    Zhang Hao; Xu Jiajun

    1997-01-01

    The author introduces one of software methods of how to get a PC graphic interface operation when a MS-DOS driver is the only possible copy for the device. Human-machine interactive graphic interface is more popular nowadays since it has rich pages and comfortable input/output operations. First step is to set up a data exchange between MS-DOS and MS-Windows through a interrupt service. Second step is to program a dynamic link library which VB can invoke. VBX control is possible to extend the system functions. The testing system can test main performances automatically with CAMAC modules of IDIM, IDOM, PSC, SAM, and 3016. It seems the better way to test the linearity, AC correction and so on. The testing system is proved to be useable in maintaining CAMAC modules of BEPC control system

  6. Data acquisition system for PLT Neutral Beam Test Stand

    International Nuclear Information System (INIS)

    Francis, J.E. Jr.; Hammons, C.E.

    1977-01-01

    The PLT Neutral Beam Test Stand at Oak Ridge National Laboratory was constructed to test and condition powerful neutral beam sources for the Princeton Large Torus experiment at Princeton Plasma Physics Laboratory. The data acquisition system for the test stand monitors the beam characteristics and power output to determine if the beam is operating at its design specifications. The high speed of the computer system is utilized to provide near-real-time analysis of experimental data. The analysis of the data is presented as numerical tabulation and graphic display

  7. Artificial intelligence and expert systems in-flight software testing

    Science.gov (United States)

    Demasie, M. P.; Muratore, J. F.

    1991-01-01

    The authors discuss the introduction of advanced information systems technologies such as artificial intelligence, expert systems, and advanced human-computer interfaces directly into Space Shuttle software engineering. The reconfiguration automation project (RAP) was initiated to coordinate this move towards 1990s software technology. The idea behind RAP is to automate several phases of the flight software testing procedure and to introduce AI and ES into space shuttle flight software testing. In the first phase of RAP, conventional tools to automate regression testing have already been developed or acquired. There are currently three tools in use.

  8. Safety Test Report for the PWR S/F Dry Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Seo, K. S.; Lee, J. H.; Koo, K. H.; Lee, J. C.; Choi, W. S.; Bang, K. S.; Park, H. Y.; Jang, S. Y

    2008-10-15

    This is contract report conducted by KAERI under the contract with NETEC for safety test for the PWR S/F dry storage system. Leak Test was performed after drop test and turn-over test, the measured leakage rate was lower than allowable leakage rate. It is revealed that the containment integrity of the dry storage system is maintained. In the seismic test, the moving of the model was measured at SRTH seismic response of 0.4 g and 0.8 g. Therefore the seismic test results can be used fully to the test data for verification of the seismic analysis. In the thermal test, the direction of the inlet and outlet of the air has no effect on the heat transfer performance. The passive heat removal system of the horizontal storage module was designed well.

  9. Biofilm production and antibiotic susceptibility profile of Escherichia ...

    African Journals Online (AJOL)

    Of the 139 isolates tested, 58 (42%) were biofilm producers with 22 (16%) of these being strong biofilm producers. Antibiotic resistance was common but kanamycin, meropenem and lomefloxacin were the most active with 6.6, 5.8 and 4.3% resistance rates respectively. The rate of biofilm formation was higher among E. coli ...

  10. Online Testing of Real-time Systems Using Uppaal

    DEFF Research Database (Denmark)

    Larsen, Kim Guldstrand; Mikucionis, Marius; Nielsen, Brian

    2005-01-01

    We present T-Uppaal{} -- a new tool for online black-box testing of real-time embedded systems from non-deterministic timed automata specifications. We describe a sound and complete randomized online testing algorithm and how to implement it using symbolic state representation and manipulation te...

  11. NI Based System for Seu Testing of Memory Chips for Avionics

    Directory of Open Access Journals (Sweden)

    Boruzdina Anna

    2016-01-01

    Full Text Available This paper presents the results of implementation of National Instrument based system for Single Event Upset testing of memory chips into neutron generator experimental facility, which used for SEU tests for avionics purposes. Basic SEU testing algorithm with error correction and constant errors detection is presented. The issues of radiation shielding of NI based system are discussed and solved. The examples of experimental results show the applicability of the presented system for SEU memory testing under neutrons influence.

  12. Apollo telescope mount thermal systems unit thermal vacuum test

    Science.gov (United States)

    Trucks, H. F.; Hueter, U.; Wise, J. H.; Bachtel, F. D.

    1971-01-01

    The Apollo Telescope Mount's thermal systems unit was utilized to conduct a full-scale thermal vacuum test to verify the thermal design and the analytical techniques used to develop the thermal mathematical models. Thermal vacuum test philosophy, test objectives configuration, test monitoring, environment simulation, vehicle test performance, and data correlation are discussed. Emphasis is placed on planning and execution of the thermal vacuum test with particular attention on problems encountered in conducting a test of this maguitude.

  13. Testing of the West Valley Vitrification Facility transfer cart control system

    International Nuclear Information System (INIS)

    Halliwell, J.W.; Bradley, E.C.

    1995-01-01

    Oak Ridge National Laboratory (ORNL) has designed and tested the control system for the West Valley Demonstration Project Vitrification Facility transfer cart. The transfer cart will transfer canisters of vitrified high-level waste remotely within the Vitrification Facility. The control system operates the cart under battery power by wireless control. The equipment includes cart-mounted control electronics, battery charger, control pendants, engineer's console, and facility antennas. Testing was performed in several phases of development: (1) prototype equipment was built and tested during design, (2) board-level testing was then performed at ORNL during fabrication, and (3) system-level testing was then performed by ORNL at the fabrication subcontractor's facility for the completed cart system. These tests verified (1) the performance of the cart relative to design requirements and (2) operation of various built-in cart features. The final phase of testing is planned to be conducted during installation at the West Valley Vitrification Facility

  14. Cryogenic systems for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Slack, D.S.; Nelson, R.L.; Chronis, W.C.

    1985-08-01

    This paper includes an in-depth discussion of the design, fabrication, and operation of the Mirror Fusion Test Facility (MFTF) cryogenic system located at Lawrence Livermore National Laboratory (LLNL). Each subsystem discussed to present a basic composite of the entire facility. The following subsystems are included: 500kW nitrogen reliquefier, subcoolers, and distribution system; 15kW helium refrigerator/liquefier and distribution system; helium recovery and storage system; rough vacuum and high vacuum systems

  15. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  16. Inhibition by Commercial Aminoglycosides of Human Connexin Hemichannels Expressed in Bacteria

    Directory of Open Access Journals (Sweden)

    Mariana C. Fiori

    2017-11-01

    Full Text Available In addition to gap junctional channels that mediate cell-to-cell communication, connexins form hemichannels that are present at the plasma membrane. Since hemichannels are permeable to small hydrophilic compounds, including metabolites and signaling molecules, their abnormal opening can cause or contribute to cell damage in disorders such as cardiac infarct, stroke, deafness, skin diseases, and cataracts. Therefore, hemichannels are potential pharmacological targets. A few aminoglycosides, well-known broad-spectrum antibiotics, have been shown to inhibit hemichannels. Here, we tested several commercially available aminoglycosides for inhibition of human connexin hemichannels using a cell-based bacterial growth complementation assay that we developed recently. We found that kanamycin A, kanamycin B, geneticin, neomycin, and paromomycin are effective inhibitors of hemichannels formed by connexins 26, 43, and 46 (Cx26, Cx43, and Cx46. Because of the >70 years of clinical experience with aminoglycosides and the fact that several of the aminoglycosides tested here have been used in humans, they are promising starting points for the development of effective connexin hemichannel inhibitors.

  17. Hanford Site Emergency Alerting System siren testing report

    International Nuclear Information System (INIS)

    Weidner, L.B.

    1997-01-01

    The purpose of the test was to determine the effective coverage of the proposed upgrades to the existing Hanford Site Emergency Alerting System (HSEAS). The upgrades are to enhance the existing HSEAS along the Columbia River from the Vernita Bridge to the White Bluffs Boat Launch as well as install a new alerting system in the 400 Area on the Hanford Site. Five siren sites along the Columbia River and two sites in the 400 Area were tested to determine the site locations that will provide the desired coverage

  18. RHIC sextant test: Accelerator systems and performance

    Energy Technology Data Exchange (ETDEWEB)

    Pilat, F.; Trbojevic, D.; Ahrens, L. [and others

    1997-08-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning.

  19. RHIC sextant test: Accelerator systems and performance

    International Nuclear Information System (INIS)

    Pilat, F.; Trbojevic, D.; Ahrens, L.

    1997-01-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning

  20. Development of prototype virtual testing system for ultrasonic examination engineers

    International Nuclear Information System (INIS)

    Shohji, Hajime; Hide, Koichiro

    2015-01-01

    The reliability of inspection results is affected by the skill of examination personnel, particularly with regard to manual ultrasonic testing (UT). The number and design of test specimens are among the most important points to be considered during training or assessing the qualification of UT examination personnel. For training, a simulated UT training system using a computer mouse or touch sensor was proposed. However, this system proved to be inadequate as a replacement with for actual UT work. In this study, we have developed a novel virtual UT system that simulates actual UT work for piping welds. This system (Tool for Realistic UltraSound Testing) consists of a dummy UT probe, dummy piping, a computer system, and a 3D position detection system. It can detect the state of the dummy probe (3D position, skewing angle), and displays recorded A-scan data corresponding to the dummy probe status with random noise. Furthermore, it does not display A-scan data if the dummy probe is not in contact with the pipe. Thus, in this way, the system simulates actual UT work. Using this system, it is possible to significantly reduce the number of test specimens being utilized for training or assessing the qualification of UT examination personnel. Additionally, highly efficient training and certification will be achieved through this system. (author)