WorldWideScience

Sample records for isu design project

  1. Isu-Isu Genetik Manusia Dari Perspektif Sains & Islam

    Directory of Open Access Journals (Sweden)

    Engku Ahmad Zaki Engku Alwi

    2017-12-01

    Full Text Available Kejuruteraan genetik dan teknologi rekombinan merupakan penemuan penting yang telah memacu perkembangan pesat dalam bidang bioteknologi moden terutamanya dalam penyelidikan dan pembangunan (R&D. Walaupun begitu, perkembangan tersebut menimbulkan isu dan persoalan agama serta etika khususnya melibatkan teknik pembiakan buatan, pemindahan organ, pengklonan dan kejuruteraan genetik itu sendiri. Isu etika sering ditekankan dalam pelbagai cabang ilmu dan memainkan peranan sangat penting dalam sistem hidup manusia serta berkait rapat dengan agama. Oleh yang demikian, penulisan kertas kerja ini bertujuan mendedahkan berkaitan Projek Genom Manusia (PGM dan isu-isu genetik manusia yang timbul dari perspektif sains dan Islam seperti Teori Evolusi Darwin, PGM, pengklonan manusia dan eugenik. Akhirnya, isu-isu yang timbul dari aplikasi teknologi genetik manusia perlu ditangani dengan sebaik mungkin melalui etika sains serta diintegrasikan dengan ajaran Islam supaya segala pencapaian bidang ini tidak merosakkan alam dan populasi manusia seterusnya menjadikan kehidupan manusia lebih baik dan kondusif dari semasa ke semasa.

  2. Isu-Isu Genetik Manusia Dari Perspektif Sains & Islam

    OpenAIRE

    Engku Ahmad Zaki Engku Alwi; Norazmi Anas; Wan Rohani Wan Taib; Mohd. Hudzari Razali

    2017-01-01

    Kejuruteraan genetik dan teknologi rekombinan merupakan penemuan penting yang telah memacu perkembangan pesat dalam bidang bioteknologi moden terutamanya dalam penyelidikan dan pembangunan (R&D). Walaupun begitu, perkembangan tersebut menimbulkan isu dan persoalan agama serta etika khususnya melibatkan teknik pembiakan buatan, pemindahan organ, pengklonan dan kejuruteraan genetik itu sendiri. Isu etika sering ditekankan dalam pelbagai cabang ilmu dan memainkan...

  3. An ISU study of asteroid mining

    Science.gov (United States)

    Burke, J. D.

    During the 1990 summer session of the International Space University, 59 graduate students from 16 countries carried out a design project on using the resources of near-earth asteroids. The results of the project, whose full report is now available from ISU, are summarized. The student team included people in these fields: architecture, business and management, engineering, life sciences, physical sciences, policy and law, resources and manufacturing, and satellite applications. They designed a project for transporting equipment and personnel to a near-earth asteroid, setting up a mining base there, and hauling products back for use in cislunar space. In addition, they outlined the needed precursor steps, beginning with expansion of present ground-based programs for finding and characterizing near-earth asteroids and continuing with automated flight missions to candidate bodies. (To limit the summer project's scope the actual design of these flight-mission precursors was excluded.) The main conclusions were that asteroid mining may provide an important complement to the future use of lunar resources, with the potential to provide large amounts of water and carbonaceous materials for use off earth. However, the recovery of such materials from presently known asteroids did not show an economic gain under the study assumptions; therefore, asteroid mining cannot yet be considered a prospective business.

  4. Planetary science education in a multidisciplinar environment: an alternative approach for ISU

    Science.gov (United States)

    Calzada, A.

    2012-09-01

    The aim of the International Space University (ISU) located in Strasbourg, France, is to provide to the participants of its programs an overview of all the aspects of the space field. This also includes a basic background on Planetary Sciences. During the Master 2012 an individual project about impact processes was done. During this project some issues regarding planetary science awareness arise and it brought to the table the need to increase its presence in the ISU programs. The conclusions may be extrapolated to other academic institutions.

  5. An ISU(3) hadron mass formula

    International Nuclear Information System (INIS)

    Perjes, Z.; Sparling, G.A.J.

    1980-12-01

    A universal mass expression is derived for non-charm hadrons which unites GMO formulae for various multiplets. Mass splitting is achieved via the generators of the 14-parameter ISU(3) group. The spectrum depends on three parameters which vary with the spin. Comparison with particle data shows a nearly linear dependence. (author)

  6. ELECTRONIC COMMERCE: TANTANGAN KOMPETENSI AKUNTAN DALAM MENGHADAPI ISU INTERNAL KONTROL

    Directory of Open Access Journals (Sweden)

    Setyarini Santosa

    2002-01-01

    Full Text Available The emerging of the internet and world wide web as enabler of electronic commerce has resulted in some complexities for accountants in conducting their engagement. In electronic commerce, which trading activities have been facilitated with computer network such as intranet, extranet or internet, internal control structure has become more complicated than those without network. Confidentiality, integrity, authenticity and non-repudiation are some of the major complex issues in the application of electronic commerce these days.Those complexities, which do not occur in non computer-based trading, are based on the fact that electronic commerce not only involves accounting disiplines but also technical comprehension from other diciplines. Accountants find difficulties in facing the internal control issues in computer-based information system environment, especially in a situation that business has already been implementing computer network in conducting its primary and support activities. This article will discuss material related to the current issues of internal control structure, the implication of electronic commerce on internal control structure and opportunities for accountants. Abstract in Bahasa Indonesia : Kemunculan internet dan world wide web sebagai dasar berkembangnya perdagangan elektronik atau electronic commerce telah menimbulkan permasalahan yang cukup pelik bagi seorang akuntan dalam menjalankan penugasannya. Dalam lingkungan perdagangan yang sudah memanfaatkan jaringan komputer, baik dalam kapasitasnya sebagai intranet, extranet, maupun internet, sistem pengendalian internal menjadi semakin rumit. Beberapa isu seperti keamanan dan keaslian transaksi yang dulunya nampak sederhana dalam lingkungan yang tidak berbasis komputer, sekarang menjadi sangat kompleks. Dalam electronic commerce, isu-isu tersebut dikenal dengan istilah confidentiality, integrity, authenticity, non-repudiation dan sebagainya. Kekompleksan ini dikarenakan hal

  7. Interaction of J-protein co-chaperone Jac1 with Fe-S scaffold Isu is indispensible in vivo and conserved in evolution

    Science.gov (United States)

    Ciesielski, Szymon; Schilke, Brenda; Osipiuk, Jerzy; Bigelow, Lance; Mulligan, Rory; Majewska, Julia; Joachimiak, Andrzej; Marszalek, Jaroslaw; Craig, Elizabeth A.; Dutkiewicz, Rafal

    2012-01-01

    The ubiquitous mitochondrial J-protein Jac1, called HscB in Escherichia coli, and its partner Hsp70 play a critical role in the transfer of Fe-S clusters from the scaffold protein Isu to recipient proteins. Biochemical results from eukaryotic and prokaryotic systems indicate that formation of the Jac1-Isu complex is important for both targeting of the Isu for Hsp70 binding and stimulation of Hsp70’s ATPase activity. However, in apparent contradiction, we previously reported that an 8 fold decrease in Jac1’s affinity for Isu1 is well tolerated in vivo, raising the question as to whether the Jac1:Isu interaction actually plays an important biological role. Here we report the determination of the structure of Jac1 from Saccharomyces cerevisiae. Taking advantage of this information and recently published data from the homologous bacterial system, a total of eight surface exposed residues were determined to play a role in Isu binding, as assessed by a set of biochemical assays. A variant having alanines substituted for these eight residues was unable to support growth of a jac1-Δ strain. However, replacement of three residues caused partial loss of function, resulting in a significant decrease in the Jac1:Isu1 interaction, a slow growth phenotype and a reduction in the activity of Fe-S cluster containing enzymes. Thus, we conclude that the Jac1:Isu1 interaction plays an indispensible role in the essential process of mitochondrial Fe-S cluster biogenesis. PMID:22306468

  8. Interaction of J-protein co-chaperone Jac1 with Fe-S scaffold Isu is indispensable in vivo and conserved in evolution.

    Science.gov (United States)

    Ciesielski, Szymon J; Schilke, Brenda A; Osipiuk, Jerzy; Bigelow, Lance; Mulligan, Rory; Majewska, Julia; Joachimiak, Andrzej; Marszalek, Jaroslaw; Craig, Elizabeth A; Dutkiewicz, Rafal

    2012-03-16

    The ubiquitous mitochondrial J-protein Jac1, called HscB in Escherichia coli, and its partner Hsp70 play a critical role in the transfer of Fe-S clusters from the scaffold protein Isu to recipient proteins. Biochemical results from eukaryotic and prokaryotic systems indicate that formation of the Jac1-Isu complex is important for both targeting of the Isu for Hsp70 binding and stimulation of Hsp70's ATPase activity. However, in apparent contradiction, we previously reported that an 8-fold decrease in Jac1's affinity for Isu1 is well tolerated in vivo, raising the question as to whether the Jac1:Isu interaction actually plays an important biological role. Here, we report the determination of the structure of Jac1 from Saccharomyces cerevisiae. Taking advantage of this information and recently published data from the homologous bacterial system, we determined that a total of eight surface-exposed residues play a role in Isu binding, as assessed by a set of biochemical assays. A variant having alanines substituted for these eight residues was unable to support growth of a jac1-Δ strain. However, replacement of three residues caused partial loss of function, resulting in a significant decrease in the Jac1:Isu1 interaction, a slow growth phenotype, and a reduction in the activity of Fe-S cluster-containing enzymes. Thus, we conclude that the Jac1:Isu1 interaction plays an indispensable role in the essential process of mitochondrial Fe-S cluster biogenesis. Copyright © 2012 Elsevier Ltd. All rights reserved.

  9. Architecture of the Yeast Mitochondrial Iron-Sulfur Cluster Assembly Machinery: THE SUB-COMPLEX FORMED BY THE IRON DONOR, Yfh1 PROTEIN, AND THE SCAFFOLD, Isu1 PROTEIN.

    Science.gov (United States)

    Ranatunga, Wasantha; Gakh, Oleksandr; Galeano, Belinda K; Smith, Douglas Y; Söderberg, Christopher A G; Al-Karadaghi, Salam; Thompson, James R; Isaya, Grazia

    2016-05-06

    The biosynthesis of Fe-S clusters is a vital process involving the delivery of elemental iron and sulfur to scaffold proteins via molecular interactions that are still poorly defined. We reconstituted a stable, functional complex consisting of the iron donor, Yfh1 (yeast frataxin homologue 1), and the Fe-S cluster scaffold, Isu1, with 1:1 stoichiometry, [Yfh1]24·[Isu1]24 Using negative staining transmission EM and single particle analysis, we obtained a three-dimensional reconstruction of this complex at a resolution of ∼17 Å. In addition, via chemical cross-linking, limited proteolysis, and mass spectrometry, we identified protein-protein interaction surfaces within the complex. The data together reveal that [Yfh1]24·[Isu1]24 is a roughly cubic macromolecule consisting of one symmetric Isu1 trimer binding on top of one symmetric Yfh1 trimer at each of its eight vertices. Furthermore, molecular modeling suggests that two subunits of the cysteine desulfurase, Nfs1, may bind symmetrically on top of two adjacent Isu1 trimers in a manner that creates two putative [2Fe-2S] cluster assembly centers. In each center, conserved amino acids known to be involved in sulfur and iron donation by Nfs1 and Yfh1, respectively, are in close proximity to the Fe-S cluster-coordinating residues of Isu1. We suggest that this architecture is suitable to ensure concerted and protected transfer of potentially toxic iron and sulfur atoms to Isu1 during Fe-S cluster assembly. © 2016 by The American Society for Biochemistry and Molecular Biology, Inc.

  10. Retorika Barack Hussein Obama Dan Susilo Bambang Yudhoyono Dalam Menanggapi Isu Isis Di Dunia

    Directory of Open Access Journals (Sweden)

    Livia

    2015-07-01

    Full Text Available This research discuss about the rhetoric performed by Barack Hussein Obama as President of the United States and Susilo Bambang Yudhoyono as President of the Republic of Indonesia in delivering feedback over the ISIS issue that circulating around the world. ISIS is an organization who commit acts of terrorism in the name of Islam. The United States is known as ‘anti-Islam’ country’s, while Indonesia has the largest Muslim population in the world. Therefore, author used Roland Barthes semiotic to reveal differences in this two figures seen from their rhetoric of verbal and non-verbal language. Thus, we can reveal how this two figures performed their rhetoric over the ISIS issue that conveyed to the international community. Penelitian ini membahas mengenai retorika yang dilakukan oleh Barack Hussein Obama selaku Presiden Amerika Serikat dan Susilo Bambang Yudhoyono selaku Presiden Republik Indonesia dalam memberikan tanggapan mengenai isu ISIS yang beredar di dunia. ISIS merupakan sebuah organisasi yang melakukan tindakan terorisme dengan mengatasnamakan Islam. Amerika Serikat merupakan negara yang dikenal sebagai negara ‘anti Islam’, sedangkan Indonesia merupakan negara dengan penduduk muslim terbanyak di dunia. Oleh karena itu, penulis menggunakan semiotik Roland Barthes untuk mengungkapkan perbedaan retorika kedua tokoh dilihat dari bahasa verbal dan non verbalnya. Dengan demikian, dapat terlihat seperti apa retorika yang dilakukan oleh kedua tokoh yang ingin disampaikan kepada masyarakat internasional terkait isu ISIS.

  11. The International Space University

    Science.gov (United States)

    Davidian, Kenneth J.

    1990-01-01

    The International Space University (ISU) was founded on the premise that any major space program in the future would require international cooperation as a necessary first step toward its successful completion. ISU is devoted to being a leading center for educating future authorities in the world space industry. ISU's background, goals, current form, and future plans are described. The results and benefits of the type of education and experience gained from ISU include technical reports describing the design projects undertaken by the students, an exposure to the many different disciplines which are a part of a large space project, an awareness of the existing activities from around the world in the space community, and an international professional network which spans all aspects of space activities and covers the globe.

  12. ANALISIS ARGUMENTASI MAHASISWA PENDIDIKAN BIOLOGI PADA ISU SOSIOSAINFIK KONSUMSI GENETICALLY MODIFIED ORGANISM (GMO

    Directory of Open Access Journals (Sweden)

    Y. Herlanti

    2014-04-01

    Full Text Available Penelitian ini bertujuan untuk menganalisis argumentasi yang dikemukakan oleh mahasiswa pendidikan biologi terkait isu sosiosaintifik yaitu konsumsi pangan Genetically Modified Organism (GMO.  Penelitian menggunakan metode survei secara online.  Partisipan yang berasal dari semester III-VII Universitas Islam Negeri Jakarta yang secara sukarela mengisi kuisioner online yang diunggah pada weblog. Hasil penelitian menunjukkan isu sosiosaintifik GMO lebih banyak ditanggapi secara saintifik oleh partisipan.  Argumentasi sebagian besar berada pada level II, yaitu telah mampu mengungkapkan sebuah klaim disertai dengan alasan. Hanya sedikit yang sudah mampu memberikan argumen secara holistik (level IV, yaitu mampu mengungkapkan argumen dengan alasan yang kuat yang tidak mudah dibantah.  Umumnya argumentasi yang dikemukan partisipan berjenis argumentasi sederhana dan argumentasi tipe rantai.  Berdasarkan temuan ini, perlu dikembangkan sebuah model perkuliahan yang dapat meningkatkan keterampilan berargumentasi. This research aimed to analyze the argument for socioscientifik issue “Genetically Modified Organism (GMO Food Consumtion”.  This reseach used online survey.  Participant filled online questionaire that uploaded in weblog.  Participants are student of biology education in Jakarta Islamic State University. The result showed most participants gave scientific view in their argument.  Most of argumentations were in level II; participants gave a klaim within a warrant.  Only a few argument were in level IV, it’s a holistic argument that contained a klaim, a warrant, a backing, and a rebuttal.  Most of argument had simple type or chain type.  From this result, university must develop strategies of lecturing to improve argumentation skill.

  13. The Second Annual International Space University Alumni Conference

    Science.gov (United States)

    Johnson, Les (Compiler); Robinson, Paul A. (Compiler)

    1994-01-01

    The papers presented at the conference reflect the multidisciplinary nature of the International Space University (ISU) and its alumni. The first papers presented hold special relevance to the design projects, and cover such topics as lunar-based astronomical instrumentation, solar lunar power generation, habitation on the moon, and the legal issues governing multinational astronauts conducting research in space. The next set of papers cover various technical issues such as project success assessment, satellite networks and space station dynamics, thus reflecting the diverse backgrounds of the ISU alumni.

  14. DISCOURSE ANALYSIS OF JLO COMPANY ESTABLISHMENT ISSUE IN ONLINE MEDIA AND MEDIA RELATIONS TREATMENT OF JASA MARGA COMPANY (ANALISIS WACANA ISU PENDIRIAN PT. JLO DI MEDIA ONLINE DAN TREATMENT MEDIA RELATIONS PT. JASA MARGA

    Directory of Open Access Journals (Sweden)

    Icha Bella Widawati

    2017-02-01

    Full Text Available Abstract. discourse Analysis of Coverage in the Online Media Liputan6.com. Regarding to Establishment Issue of New Subsidiary PT. Jasa Layanan Operasi ( PT . JLO . The research is about coverage analysis to see the implementatiom issue management through me-dia relations activations at online media by Jasa Marga’s Public Relations Officer. This study aims to determine the discourse analysis of coverage regarding to establishment issue of new subsidiary PT. JLO in the online media and to see how Jasa Marga’s public relations of-ficer exercises issue management through media relations activations to handle the issues. Using the discourse analysis method with Halliday model of analysis. The results showed that the discourse in the news are based on fact that really happened. News content is served with a different point of view and very objective. The Media shows its position as a netral posi-tion between two sides of subjects, objective, and reporting the truth to the public. it shows that media relations activations is not bring much influence to the emerging issues and nega-tive news in the media. The conclusion of this study is the coverage was experiencing news balance between negative tone and positive tone after PRO did the media relations activations. But does not eliminate the negative news regarding the issue of the establish-ment of a subsidiary JLO. Abstrak. artikel ini merupakan sebuah analisis wacana pemberitaan di Media Online Liputan6.com mengenai Isu Pendirian Anak Usaha Baru PT. Jasa Layanan Operasi (PT. JLO serta melihat Implementasi Manajemen Isu Melalui Media Relations pada Media Online yang Dilakukan Oleh Humas Jasa Marga dengan. Penelitian ini bertujuan untuk menge-tahui analisis wacana dari Informasi pemberitaan mengenai isu pendirian anak usaha baru Jasa Marga, PT. Jasa Layanan Operasi (JLO di media online Liputan6.com dan melihat bagaimana manajemen isu melalui kegiatan media relations dilakukan untuk mengatasi isu

  15. Project Management Series Case Study: The Office of Registration and Records

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the third in a series of eight articles on project management (PM) in the academy. In this article, the authors describe the step-by-step implementation of a structural change to Indiana State University's (ISU's) Office of Registration and Records (ORR). The process described may vary as it is implemented elsewhere, but the authors…

  16. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  17. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  18. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  19. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  20. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  1. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  2. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  3. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  4. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  5. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  6. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  7. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  8. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    between knowledge and technology through knowledge communication processes, cultural and rhetorical contexts. This connection is examined from a process point of view through the development of project goals and objectives to situate technology. The data comes from a Project Management course in which...... the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...... the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication. Keywords: Knowledge Communication, Knowledge Management, Socio-Technical Design, Project Management....

  9. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  10. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  11. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  12. Systematic design for trait introgression projects.

    Science.gov (United States)

    Cameron, John N; Han, Ye; Wang, Lizhi; Beavis, William D

    2017-10-01

    Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into Pareto optimality plots associated with any arbitrary selection strategy. The Pareto plots can be used to make rational decisions concerning the trade-offs between maximizing the probability of success while minimizing costs and time. The systematic rigor associated with a cost, time and probability of success (CTP) framework is well suited to designing TI projects that require dynamic decision making. The CTP framework also revealed that previously identified 'best' strategies can be improved to be at least twice as effective without increasing time or expenses.

  13. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    experiences and expertise to guide the students’ decisions in relation to the design project. This paper focuses on project supervision in the context of design education – and more specifically on how this supervision is unfolded in a Problem Based Learning culture. The paper explores the supervisor......’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop......In design there is a long tradition for apprenticeship, as well as tradition for learning through design projects. Today many design educations are positioned within the University context, and have to be aligned with the learning culture and structure, which they represent. This raises a specific...

  14. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  15. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  16. 34 CFR 637.13 - What are design projects?

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.13 What are design projects? (a) Design... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13...

  17. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... and the Aarhus School of Business, University of Aarhus, Denmark. The analysis demonstrates the potential of knowledge communication concepts for social technical design and highlights the cultural context of the designers as a key factor to consider in socio-technical design....

  18. Learning from participatory design projects across industries

    DEFF Research Database (Denmark)

    Broberg, Ole; Souza da Conceição, Carolina

    2017-01-01

    Summative Statement: A preliminary framework for participatory design projects (PDP) was developed based on a retrospective analysis of five PDPs across different industries. The framework may serve as a guidance for planning and conducting PDPs. Problem statement: A growing number of experiences...... with participatory design or participatory ergonomics projects have been gained within the field of macro-ergonomics. It is suggested that the Participatory Ergonomics Framework (PEF) validated by Haines et al. (2002) needs to be updated based on these experiences and hence more focussed on design activities....... Research Objective / Question: The objective of this study was to update and design-orient the PEF based on experiences with PDPs within the last ten years. Methodology: Five participatory design projects across different industries were systematically analyzed and compared in order to develop a framework...

  19. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  20. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  1. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  2. Design, Fabrication and Testing of the MICOM-ISU Shipping and Storage Container

    National Research Council Canada - National Science Library

    Gilreath, Jason

    1997-01-01

    .... This is an unpainted, welded, controlled breathing, aluminum container. It is a low base design with an internal cradle system that is mounted to the base via four stainless steel cable or flex mounts...

  3. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  4. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    Science.gov (United States)

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  5. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  6. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  7. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  8. Various advanced design projects promoting engineering education

    Science.gov (United States)

    1994-01-01

    The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

  9. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  10. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  11. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  12. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  13. The role of the International Space University in building capacity in emerging space nations.

    Science.gov (United States)

    Richards, Robert

    The International Space University provides graduate-level training to the future leaders of the emerging global space community at its Central Campus in Strasbourg, France, and at locations around the world. In its two-month Summer Session and one-year Masters program, ISU offers its students a unique Core Curriculum covering all disciplines related to space programs and enterprises - space science, space engineering, systems engineering, space policy and law, business and management, and space and society. Both programs also involve an intense student research Team Project providing international graduate students and young space professionals the opportunity to solve complex problems by working together in an intercultural environment. Since its founding in 1987, ISU has graduated more than 2500 students from 96 countries. Together with hundreds of ISU faculty and lecturers from around the world, ISU alumni comprise an extremely effective network of space professionals and leaders that actively facilitates individual career growth, professional activities and international space cooperation.

  14. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  15. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  16. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  17. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  18. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  19. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  20. Project X: Accelerator Reference Design

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, Stephen D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-06-20

    Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible

  1. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  2. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  3. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  4. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  5. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  6. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  7. Embankment quality and assessment of moisture control implementation : tech transfer summary.

    Science.gov (United States)

    2016-02-01

    The motivation for this project was based on work by : Iowa State University (ISU) researchers at a few recent : grading projects that demonstrated embankments were : being constructed outside moisture control limits, even : though the contractor QC ...

  8. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  9. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  10. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  11. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  12. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  13. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  14. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  15. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  16. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  17. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  18. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  19. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  20. Delft Aerospace Design Projects 2016 : Inspring Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2016-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2015 and the Spring Design Synthesis Exercise of 2016, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  1. Delft Aerospace Design Projects 2014 : New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2014-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2013 and the Spring Design Synthesis Exercise of 2014, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  2. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  3. Design fixation and cooperative learning in elementary engineering design project: A case study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  4. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  5. Capstone Engineering Design Projects for Community Colleges

    Science.gov (United States)

    Walz, Kenneth A.; Christian, Jon R.

    2017-01-01

    Capstone engineering design courses have been a feature at research universities and four-year schools for many years. Although such classes are less common at two-year colleges, the experience is equally beneficial for this population of students. With this in mind, Madison College introduced a project-based Engineering Design course in 2007.…

  6. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  7. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  8. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  9. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  10. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  11. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  12. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  13. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  14. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  15. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  16. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  17. Improving the detection of illicit substance use in preoperative anesthesiological assessment.

    Science.gov (United States)

    Kleinwächter, R; Kork, F; Weiss-Gerlach, E; Ramme, A; Linnen, H; Radtke, F; Lütz, A; Krampe, H; Spies, C D

    2010-01-01

    Illicit substance use (ISU) is a worldwide burden, and its prevalence in surgical patients has not been well investigated. Co-consumption of legal substances, such as alcohol and tobacco, complicates the perioperative management and is frequently underestimated during routine preoperative assessment. The aim of this study was to compare the anesthesiologists' detection rate of ISU during routine preoperative assessment with a computerized self-assessment questionnaire. In total, 2,938 patients were included in this study. Prior to preoperative assessment, patients were asked to complete a computer-based questionnaire that addressed ISU, alcohol use disorder (AUDIT), nicotine use (Fagerström) and socio-economic variables (education, income, employment, partnership and size of household). Medical records were reviewed, and the anesthesiologists' detection of ISU was compared to the patients' self-reported ISU. Seven point five percent of patients reported ISU within the previous twelve months. ISU was highest in the age group between 18 and 30 years (26.4%; P<0.01). Patients reporting ISU were more often men than women (P<0.01), smokers (P<0.01) and tested positive for alcohol use disorder (P<0.01). Anesthesiologists detected ISU in one in 43 patients, whereas the computerized self-assessment reported it in one in 13 patients. The detection was best in the subgroup self-reporting frequent ISU (P<0.01). Anesthesiologists underestimate the prevalence of ISU. Computer-based self-assessment increases the detection of ISU in preoperative assessment and may decrease perioperative risk. More strategies to improve the detection of ISU as well as brief interventions for ISU are required in preoperative assessment clinics.

  18. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  19. Radiological air monitoring and sample analysis research and development progress report

    International Nuclear Information System (INIS)

    1992-01-01

    Sponsored by a Department Of Energy (DOE) research and development grant, the State of Idaho INEL Oversight Program (OP) personnel designed an independent air monitoring system that provides detection of the presence of priority airborne contaminants potentially migrating beyond INEL boundaries. Initial locations for off-site ambient air monitoring stations were chosen in consultation with: DOE and NOAA reports; Mesodif modeling; review of the relevant literature; and communication with private contractors and experts in pertinent fields. Idaho State University (ISU) has initiated an Environmental Monitoring Program (EMP). The EMP provides an independent monitoring function as well as a training ground for students. Students learn research techniques dedicated to environmental studies and learn analytical skills and rules of compliance related to monitoring. ISU-EMP assisted OP in specific aspects of identifying optimum permanent monitoring station locations, and in selecting appropriate sample collection equipment for each station. The authorization to establish, prepare and install sampling devices on selected sites was obtained by OP personnel in conjunction with ISU-EMP personnel. All samples described in this program are collected by OP or ISU-EMP personnel and returned to the ISU for analysis. This report represents the summary of results of those samples collected and analyzed for radioactivity during the year of 1992

  20. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  1. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  2. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  3. Delft Aerospace Design Projects 2015 : Challenging New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2015-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2014 and the Spring Design Synthesis Exercise of 2015, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  4. A series of student design projects for improving and modernizing safety helmets

    NARCIS (Netherlands)

    Beurden, van K.M.M. (Karin); Boer, de J. (Johannes); Stilma, M. (Margot); Teeuw, W.B. (Wouter)

    2014-01-01

    The Saxion Research Centre for Design and Technology employs many students during research projects. This paper discusses a series of student design projects on safety helmets in the Safety@Work project. At construction sites workers are required to wear personal protective equipment during their

  5. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  6. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    This paper aims to emphasize the necessity of introducing Project-Based Learning (PBL) to design enterprises in order to foster designers creativity and facilitate innovation of design enterprises. According to the literature review, creativity can be viewed as the first stage of innovation; PBL...

  7. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  8. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  9. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  10. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  11. Error begat error: design error analysis and prevention in social infrastructure projects.

    Science.gov (United States)

    Love, Peter E D; Lopez, Robert; Edwards, David J; Goh, Yang M

    2012-09-01

    Design errors contribute significantly to cost and schedule growth in social infrastructure projects and to engineering failures, which can result in accidents and loss of life. Despite considerable research that has addressed their error causation in construction projects they still remain prevalent. This paper identifies the underlying conditions that contribute to design errors in social infrastructure projects (e.g. hospitals, education, law and order type buildings). A systemic model of error causation is propagated and subsequently used to develop a learning framework for design error prevention. The research suggests that a multitude of strategies should be adopted in congruence to prevent design errors from occurring and so ensure that safety and project performance are ameliorated. Copyright © 2011. Published by Elsevier Ltd.

  12. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    Science.gov (United States)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  13. Project margins of advanced reactor design WWER-500

    International Nuclear Information System (INIS)

    Rogov, M.F.; Birukov, G.I.; Ershov, V.G.; Volkov, B.E.

    1994-01-01

    Project criteria for design of advanced WWER-500 reactor within design conditions are compared to the requirements of the Russian regulatory guides. Normal operation limits, safe operation limits for main anticipated operational occurrences and design limits accepted for design basis accidents are considered as in preliminary safety report. It is shown that the basic design criteria in the design of WWER-500 for the anticipated operational occurrences and for design basis accidents are more severe than required in the following regulatory guides General Safety Regulations for Nuclear Power Plants and Nuclear Safety Rules for Reactors of Nuclear Power Plants. This provides certain margins from safety point of view

  14. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  15. Project Lifespan-based Nonstationary Hydrologic Design Methods for Changing Environment

    Science.gov (United States)

    Xiong, L.

    2017-12-01

    Under changing environment, we must associate design floods with the design life period of projects to ensure the hydrologic design is really relevant to the operation of the hydrologic projects, because the design value for a given exceedance probability over the project life period would be significantly different from that over other time periods of the same length due to the nonstationarity of probability distributions. Several hydrologic design methods that take the design life period of projects into account have been proposed in recent years, i.e. the expected number of exceedances (ENE), design life level (DLL), equivalent reliability (ER), and average design life level (ADLL). Among the four methods to be compared, both the ENE and ER methods are return period-based methods, while DLL and ADLL are risk/reliability- based methods which estimate design values for given probability values of risk or reliability. However, the four methods can be unified together under a general framework through a relationship transforming the so-called representative reliability (RRE) into the return period, i.e. m=1/1(1-RRE), in which we compute the return period m using the representative reliability RRE.The results of nonstationary design quantiles and associated confidence intervals calculated by ENE, ER and ADLL were very similar, since ENE or ER was a special case or had a similar expression form with respect to ADLL. In particular, the design quantiles calculated by ENE and ADLL were the same when return period was equal to the length of the design life. In addition, DLL can yield similar design values if the relationship between DLL and ER/ADLL return periods is considered. Furthermore, ENE, ER and ADLL had good adaptability to either an increasing or decreasing situation, yielding not too large or too small design quantiles. This is important for applications of nonstationary hydrologic design methods in actual practice because of the concern of choosing the emerging

  16. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  17. The accuracies of DNA-based estimates of genetic merit derived from Angus or multibreed beef cattle training populations.

    Science.gov (United States)

    Weber, K L; Drake, D J; Taylor, J F; Garrick, D J; Kuehn, L A; Thallman, R M; Schnabel, R D; Snelling, W M; Pollak, E J; Van Eenennaam, A L

    2012-12-01

    Several organizations have developed prediction models for molecular breeding values (MBV) for quantitative growth and carcass traits in beef cattle using Bovine SNP50 genotypes and phenotypic or EBV data. Molecular breeding values for Angus cattle have been developed by IGENITY, Pfizer Animal Genetics, and a collaboration between researchers from Iowa State University and the University of Missouri-Columbia (ISU/UMC). The U.S. Meat Animal Research Center (USMARC; Clay Center, NE) has also developed MBV for 16 cattle breeds using 2 multibreed populations, the Germplasm Evaluation (GPE) Program and the 2,000 Bull Project (2K(ALL)), and 2 single breed subpopulations of the 2,000 Bull Project, Angus (2K(AN)) and Hereford (2K(HH)). In this study, these MBV were assessed relative to commercial ranch EBV estimated from the progeny phenotypes of Angus bulls naturally mated in multisire breeding pastures to commercial cows: 121 for USMARC MBV, 99 for ISU/UMC MBV, and 29 for IGENITY and Pfizer MBV (selected based on number of progeny carcass records). Five traits were analyzed: weaning weight (WW), HCW, marbling score (MS), rib-eye muscle area (RE), and, for IGENITY and Pfizer only, feedlot ADG. The average accuracies of MBV across traits were 0.38 ± 0.05 for IGENITY, 0.61 ± 0.12 for Pfizer, 0.46 ± 0.12 for ISU/UMC, 0.16 ± 0.04 for GPE, 0.26 ± 0.05 for 2K(ALL), 0.24 ± 0.04 for 2K(AN), and 0.02 ± 0.12 for 2K(HH). Angus-based MBV (IGENITY, Pfizer, ISU/UMC, and 2K(AN)) explained larger proportions of genetic variance in this population than GPE, 2K(ALL), or 2K(HH) MBV for the same traits. In this data set, IGENITY, Pfizer, and ISU/UMC MBV were predictive of realized performance of progeny, and incorporation of that information into national genetic evaluations would be expected to improve EPD accuracy, particularly for young animals.

  18. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  19. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  20. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  1. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  2. A biotic game design project for integrated life science and engineering education.

    Science.gov (United States)

    Cira, Nate J; Chung, Alice M; Denisin, Aleksandra K; Rensi, Stefano; Sanchez, Gabriel N; Quake, Stephen R; Riedel-Kruse, Ingmar H

    2015-03-01

    Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM) education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course). We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  3. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  4. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  5. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  6. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  7. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  8. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  9. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  10. A biotic game design project for integrated life science and engineering education.

    Directory of Open Access Journals (Sweden)

    Nate J Cira

    2015-03-01

    Full Text Available Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course. We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  11. Project Portal User-Centered Design and Engineering Report

    Science.gov (United States)

    2016-06-01

    TECHNICAL REPORT 3013 June 2016 Project Portal User-Centered Design and Engineering Report Deborah Gill-Hesselgrave Veronica Higgins Sarah...Design and Engineering Branch Under authority of Chris Raney, Head Command and Control Technology and Experiments Division iii EXECUTIVE...navy.mil  Christian Szatkowski christian.szatkowski@navy.mil  Roni Higgins roni.higgins@navy.mil  Jake Viraldo jacob.viraldo@navy.mil B

  12. Using design science in educational technology research projects

    Directory of Open Access Journals (Sweden)

    Susan M. Chard

    2017-12-01

    Full Text Available Design science is a research paradigm where the development and evaluation of a technology artefact is a key contribution. Design science is used in many domains and this paper draws on those domains to formulate a generic structure for design science research suitable for educational technology research projects. The paper includes guidelines for writing proposals using the design science research methodology for educational technology research and presents a generic research report structure. The paper presents ethical issues to consider in design science research being conducted in educational settings and contributes guidelines for assessment when the research contribution involves the creation of a technology artefact.

  13. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  14. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  15. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  16. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  17. Optical design of ultrashort throw liquid crystal on silicon projection system

    Science.gov (United States)

    Huang, Jiun-Woei

    2017-05-01

    An ultrashort throw liquid crystal on silicon (LCoS) projector for home cinema, virtual reality, and automobile heads-up display has been designed and fabricated. To achieve the best performance and highest-quality image, this study aimed to design wide-angle projection optics and optimize the illumination for LCoS. Based on the telecentric lens projection system and optimized Koehler illumination, the optical parameters were calculated. The projector's optical system consisted of a conic aspheric mirror and image optics using either symmetric double Gauss or a large-angle eyepiece to achieve a full projection angle larger than 155 deg. By applying Koehler illumination, image resolution was enhanced and the modulation transfer function of the image in high spatial frequency was increased to form a high-quality illuminated image. The partial coherence analysis verified that the design was capable of 2.5 lps/mm within a 2 m×1.5 m projected image. The throw ratio was less than 0.25 in HD format.

  18. User-inspired design methodology using Affordance Structure Matrix (ASM for construction projects

    Directory of Open Access Journals (Sweden)

    Maheswari J. Uma

    2017-01-01

    Full Text Available Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost among others. The existing design theories and practice are primarily based on functional requirements. Function-based design deals with design of artifact alone, which may yield favourable or unfavourable consequences with the design artifact. However, incorporating other interactions such as interactions between user & designer is necessary for optimised end-result. Hence, the objective of this research work is to devise a systematic design methodology considering all the three interactions among users, designers and artefacts for improved design efficiency. In this study, it has been attempted to apply the theory of affordances in a case project that involves the design of an offshore facility. A step-by-step methodology for developing Affordance Structure Matrix (ASM, which integrates House of Quality (HOQ and Design Structure Matrix (DSM, is proposed that can effectively capture the user requirements. HOQ is a popular quality management tool for capturing client requirements and DSM is a matrix-based tool that can capture the interdependency among the design entities. The proposed methodology utilises the strengths of both the tools, as DSM compliments HOQ in the process. In this methodology, different affordances such as AUA (Artifact-User-Affordance, AAA (Artifact-Artifact-Affordance and DDA (Designer-Designer-Affordance are captured systematically. Affordance is considered to be user-driven in this context that is in contrast to prevailing design

  19. Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

    Directory of Open Access Journals (Sweden)

    Lukumon Oyedele

    2012-11-01

    Full Text Available Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75, architects/engineers (0.21 ,and engineers/quantity surveyors (0.24. The percentagerank agreement factor (PRAF shows that the five mostimportant factors affecting quality are 'design changes'(78.9%; 'inadequate involvement of other professionalsduring the design stage' (78.9%; 'insufficient andunrealistic constraints of project cost' (71.1 %; 'poor levelof commitment to quality improvement among designprofessionals' (63.2%; and 'making design decisions oncost and not value of work' (55.3%. The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.

  20. User-inspired design methodology using Affordance Structure Matrix (ASM) for construction projects

    OpenAIRE

    Maheswari J. Uma; Charlesraj V. Paul C.; Battacharya Soma

    2017-01-01

    Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost am...

  1. USL/DBMS NASA/PC R and D project system design standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  2. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  3. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  4. Vision 2040: Evolving the Successful International Space University

    Science.gov (United States)

    Martin, Gary; Marti, Izan Peris; Tlustos, Reinhard; Lorente, Arnau Pons; Panerati, Jocopo; Mensink, Wendy; Sorkhabi, Elbruz; Garcia, Oriol Gasquez; Musilova, Michaela; Pearson, Thomas

    2015-01-01

    Space exploration has always been full of inspiration, innovation, and creativity, with the promise of expanding human civilization beyond Earth. The space sector is currently experiencing rapid change as disruptive technologies, grassroots programs, and new commercial initiatives have reshaped long-standing methods of operation. Throughout the last 28 years, the International Space University (ISU) has been a leading institution for space education, forming international partnerships, and encouraging entrepreneurship in its over 4,000 alumni. In this report, our Vision 2040 team projected the next 25 years of space exploration and analyzed how ISU could remain a leading institution in the rapidly changing industry. Vision 2040 considered five important future scenarios for the space sector: real-time Earth applications, orbital stations, lunar bases, lunar and asteroid mining, and a human presence on Mars. We identified the signals of disruptive change within these scenarios, including underlying driving forces and potential challenges, and derived a set of skills that will be required in the future space industry. Using these skills as a starting point, we proposed strategies in five areas of focus for ISU: the future of the Space Studies Program (SSP), analog missions, outreach, alumni, and startups. We concluded that ISU could become not just an increasingly innovative educational institution, but one that acts as an international organization that drives space commercialization, exploration, innovation, and cooperation.

  5. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  6. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  7. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  8. The relationships among iron supplement use, Hb concentration and linear growth in young children: Ethiopian Demographic and Health Survey.

    Science.gov (United States)

    Mohammed, Shimels Hussien; Esmaillzadeh, Ahmad

    2017-11-01

    Growth faltering and anaemia remain unacceptably high among infants and young children in Ethiopia. In this study, we investigated the relationships among Fe supplement use (ISU), Hb concentration and linear growth, hypothesising positive relationships between ISU and Hb, ISU and linear growth and Hb and linear growth. We used a nationally representative data of 2400 children aged 6-24 months from the Ethiopian Demographic and Health Survey (EDHS) 2011, conducted following a stratified, two-stage cluster sampling. We examined the links by Pearson's correlation, bivariate and multivariate linear regression analyses and reported adjusted estimates. We found that ISU was not significantly associated with either Hb (β=1·09; 95 % CI -2·73, 5·01, P=0·567) or linear growth (β=0·07; 95 % CI -0·06, 0·21, P=0·217). We found a positive, however, weak, correlation between Hb and linear growth (r 0·09; 95 % CI 0·06, 0·11, PHb predicted linear growth independent of a variety dietary and non-dietary factors (β=0·08; 95 % CI 0·04, 0·11, PHb; age, birth type, size at birth, sex, breast-feeding duration, dietary diversity and deworming were independently associated with linear growth, indicating that Hb and linear growth are multifactorial with both nutritional and non-nutritional factors implicated. Further studies, with better design and exposure assessment, are warranted on the relation of ISU with Hb or linear growth.

  9. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  10. Student-Designed Service-Learning Projects in an Undergraduate Neurobiology Course

    Directory of Open Access Journals (Sweden)

    Katharine V. Northcutt

    2015-12-01

    Full Text Available One of the challenges in teaching a service-learning course is obtaining student buy-in from all students in the course. To circumvent this problem, I have let students in my undergraduate Neurobiology course design their own service-learning projects at the beginning of the semester. Although this can be chaotic because it requires last-minute planning, I have made it successful through facilitating student communication in the classroom, requiring thorough project proposals, meeting with students regularly, and monitoring group progress through written reflection papers. Most of my students have strong opinions about the types of projects that they want to carry out, and many students have used connections that they have already made with local organizations. Almost all projects that students have designed to this point involve teaching basic concepts of neurobiology to children of various ages while simultaneously sparking their interest in science. Through taking ownership of the project and designing it such that it works well with their strengths, interests, and weekly schedule, students have become more engaged in service learning and view it as a valuable experience. Despite some class time being shifted away from more traditional assignments, students have performed equally well in the course, and they are more eager to talk with others about course concepts. Furthermore, the feedback that I have received from community partners has been excellent, and some students have maintained their work with the organizations.

  11. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  12. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  13. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  14. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  15. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  16. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  17. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  18. Colour and inclusivity: a visual communication design project with older people.

    Science.gov (United States)

    da Silva, Fernando Moreira

    2012-01-01

    In an ideal world, inclusive products and services would be the standard and not the exception. This paper presents a systematic approach to an overlap between Visual Communication Design, Printed Colour and Inclusive Design, for older people, with the aim to develop of a set of research-based ageing and ergonomics-centred communication design guidelines and recommendations for printed material (analogical displays). The approach included an initial extensive literature review in the area of colour, older people and ergonomics issues and vision common diseases, communication design. The second phase was the implementation of an experiment to measure the different colour experiences of the participants in two sample groups (one in UK and another one in Portugal), using printed material, to find out the colours one should use in analogical communication material, being aware of the colour contrast importance (foreground versus background) and the difficulties experienced by older people to read and understand lettering, signs. As main contribution of this research project, we developed a set of guidelines and recommendations based on the reviewed literature and the sample groups' findings, trying to demonstrate the importance of these guidelines when conceiving a new communicational design project in a way this project will achieve vision comfort and understandability, especially for older people, in an inclusive design perspective.

  19. Interactive Room Support for Complex and Distributed Design Projects

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Gundersen, Kristian Kroyer; Mogensen, Preben Holst

    2001-01-01

    We are investigating the design of digital 3D interaction technology embedded in a physical environment. We take as point of departure cemplex, collaborative industrial design projects involving heterogeneous sets of documents, and physical as well as digital 3D models. The paper introduces our...... interaction devices being experimented with in the interactive room environment. The interactive room technologies have all been designed with the requirement that they must seamlessly integrate both into the physical and into the digital work environment while providing new affordances for industrial design...

  20. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  1. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  2. Teknik Perangkingan Meta-search Engine

    OpenAIRE

    Puspitaningrum, Diyah

    2014-01-01

    Meta-search engine mengorganisasikan penyatuan hasil dari berbagai search engine dengan tujuan untuk meningkatkan presisi hasil pencarian dokumen web. Pada survei teknik perangkingan meta-search engine ini akan didiskusikan isu-isu pra-pemrosesan, rangking, dan berbagai teknik penggabungan hasil pencarian dari search engine yang berbeda-beda (multi-kombinasi). Isu-isu implementasi penggabungan 2 search engine dan 3 search engine juga menjadi sorotan. Pada makalah ini juga dibahas arahan penel...

  3. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  4. Managing nuclear projects: a design agency experience in the design-build of waste management facilities in Canada

    International Nuclear Information System (INIS)

    Brewer, R.; Calzolari, L.

    2006-01-01

    Quality Assurance guarantees the quality of a product; it does not guarantee that it is a quality product. As procedures develop to satisfy QA programs and regulatory needs it is necessary to find ways to ensure that procedural management reinforces project management and does not detract from it. CANATOM NPM's experience in bidding for and executing the design or design and construction of nuclear waste management facilities demonstrates how design excellence and innovation can still be achieved while successfully managing the challenge of technical administration. The sourcing of expertise, the intricacies of design definition and the coordinating efforts required in the execution of the projects (one fully completed, the other into its engineering phase) will provide a valuable insight into the role and activities of an engineering company engaged in a 'Design Agency' (DA) role. (author)

  5. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  6. An intelligent and interactive carpet role of design in a textile innovation project

    NARCIS (Netherlands)

    Deckers, E.J.L.; Stouw, van der B.; Peutz, J.

    2012-01-01

    This paper presents an ongoing innovation project on the development of an intelligent and interactive carpet called PeR+, short for Perception Rug Plus. This design-research project is a collaboration between an international flooring company, DESSO, and the Department of Industrial Design at the

  7. Integration and the hold-up problem in the design organization for engineering projects

    NARCIS (Netherlands)

    Zerjav, Vedran; Hartmann, Timo; Javernick-Will, A.; Chinowsky, P.

    2012-01-01

    The paper presents a perspective of the design organization in engineering projects based on the economic concept of the hold-up problem. By integrating the economic theories on the boundaries of organizations into the existing knowledge on design in engineering projects, the paper hypothesizes a

  8. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  9. Designing “Theory of Machines and Mechanisms” course on Project Based Learning approach

    DEFF Research Database (Denmark)

    Shinde, Vikas

    2013-01-01

    by the industry and the learning outcomes specified by the National Board of Accreditation (NBA), India; this course is restructured on Project Based Learning approach. A mini project is designed to suit course objectives. An objective of this paper is to discuss the rationale of this course design......Theory of Machines and Mechanisms course is one of the essential courses of Mechanical Engineering undergraduate curriculum practiced at Indian Institute. Previously, this course was taught by traditional instruction based pedagogy. In order to achieve profession specific skills demanded...... and the process followed to design a project which meets diverse objectives....

  10. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  11. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  12. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  13. A Case Study of User-Centred Design in Four Swiss RUP Projects

    Directory of Open Access Journals (Sweden)

    Ljiljana Vukelja

    2010-01-01

    Full Text Available We analysed four Rational Unified Process (RUP projects in Switzerland that identified themselves as following a user-centred approach. Grounded theory served for analysis of 12 interviews with software developers, project managers, and UI specialists. For each professional group we analysed their work context, motivations, work practices, and strategies used to overcome the obstacles to user-centred design. Results show that end users did not participate in the projects. Instead of working directly with end users, participants used data from marketing research or consulted colleagues from other departments. Prototypes played an important role. We suggest the following remedies: (1 developing methods for easy integration of existing company knowledge about products with usability features, (2 professionalising UI design by educating project stakeholders in standard UI design, (3 creating an approved pool of company's personas for UI specialists' work, and (4 educating customers on their right to get good user interfaces.

  14. Solar Collector Design Optimization: A Hands-on Project Case Study

    Science.gov (United States)

    Birnie, Dunbar P., III; Kaz, David M.; Berman, Elena A.

    2012-01-01

    A solar power collector optimization design project has been developed for use in undergraduate classrooms and/or laboratories. The design optimization depends on understanding the current-voltage characteristics of the starting photovoltaic cells as well as how the cell's electrical response changes with increased light illumination. Students…

  15. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  16. Implementation of Effective Capstone Projects in Undergraduate Manufacturing Design Engineering Program

    Science.gov (United States)

    Viswanathan, Shekar

    2017-01-01

    Final program projects (capstone course) in manufacturing design engineering technology at National University are intensive experiences in critical thinking and analysis, designed to broaden students' perspectives and provide an opportunity for integration of coursework in the area of manufacturing design engineering. This paper focuses on three…

  17. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  18. Industrial Sponsor Perspective on Leveraging Capstone Design Projects to Enhance Their Business

    Science.gov (United States)

    Weissbach, Robert S.; Snyder, Joseph W.; Evans, Edward R., Jr.; Carucci, James R., Jr.

    2017-01-01

    Capstone design projects have become commonplace among engineering and engineering technology programs. These projects are valuable tools when assessing students, as they require students to work in teams, communicate effectively, and demonstrate technical competency. The use of industrial sponsors enhances these projects by giving these projects…

  19. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  20. Rapid E-learning Development Strategies and a Multimedia Project Design Model

    Science.gov (United States)

    Sözcü, Ömer Faruk; Ipek, Ismail

    2014-01-01

    The purpose of the study is to discuss e-learning design strategies which can be used for multimedia projects as a design model. Recent advances in instructional technologies have been found to be very important in the design of training courses by using rapid instructional design (ID) approaches. The approaches were developed to use in training…

  1. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  2. High-gain capsule design for the HIDIF project

    International Nuclear Information System (INIS)

    Honrubia, J.J.; Cerrada, J.A.; Gomez, R.

    2000-01-01

    A high-gain capsule has been designed for the HIDIF project. The goal has been to relax the accelerator requirements by using a radiation pulse with lower peak temperature (220 eV) than previous designs (260 eV). The ablator material is beryllium doped with a very low concentration (0.2 atom %) of copper. The capsule absorbs 1.3 MJ and yields, approximately, 450 MJ in I-D simulations. The effect of the opacity of the ablator on capsule performance has been studied in detail. (authors)

  3. Sampling design for use by the soil decontamination project

    International Nuclear Information System (INIS)

    Rutherford, D.W.; Stevens, J.R.

    1981-01-01

    This report proposes a general approach to the problem and discusses sampling of soil to map the contaminated area and to provide samples for characterizaton of soil components and contamination. Basic concepts in sample design are reviewed with reference to environmental transuranic studies. Common designs are reviewed and evaluated for use with specific objectives that might be required by the soil decontamination project. Examples of a hierarchial design pilot study and a combined hierarchial and grid study are proposed for the Rocky Flats 903 pad area

  4. Conceptual design report, plutonium stabilization and handling,project W-460

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, E.V.

    1997-03-06

    Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

  5. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... of this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  6. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  7. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  8. Implementing a Student-Designed Green Chemistry Laboratory Project in Organic Chemistry

    Science.gov (United States)

    Graham, Kate J.; Jones, T. Nicholas; Schaller, Chris P.; McIntee, Edward J.

    2014-01-01

    A multiweek organic chemistry laboratory project is described that emphasizes sustainable practices in experimental design. An emphasis on student-driven development of the project is meant to mirror the independent nature of research. Students propose environmentally friendly modifications of several reactions. With instructor feedback, students…

  9. Development and Evaluation of an Undergraduate Multidisciplinary Project Activity in Engineering and Design

    Science.gov (United States)

    Smith, David R.; Cole, Joanne

    2012-01-01

    The School of Engineering and Design Multidisciplinary Project (MDP) at Brunel University is a one week long project based activity involving first year undergraduate students from across the School subject areas of Electronic and Computer Engineering, Mechanical Engineering, Civil Engineering and Design. This paper describes the main aims of the…

  10. Impediments to User Gains: Experiences from a Critical Participatory Design Project

    DEFF Research Database (Denmark)

    Bossen, Claus; Dindler, Christian; Iversen, Ole Sejer

    2012-01-01

    interviews with participants in a project aimed at developing technology that fosters engaging museum experiences, and rethinking cultural heritage communication. Despite the use of established PD techniques by experienced PD practitioners, a significant number of frustrations relating to the PD process were...... prominent in the research study. Based on these findings, we provide an analysis of impediments for users gains in PD projects: Differences between aims were unresolved, absence of a shared set-up for collaboration and different conceptions of technology.......Actual studies of user gains from involvement in design processes are few, although a concern for users’ gains is a core characteristic of participatory design (PD). We explore the question of user gains through a retrospective evaluation of a critical PD project. We conducted ten qualitative...

  11. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  12. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  13. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  14. Sensing and collecting radioactive materials as a project to teach engineering design

    International Nuclear Information System (INIS)

    Drake, D.; Majdi, T.; Strack, J.

    2015-01-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  15. Sensing and collecting radioactive materials as a project to teach engineering design

    Energy Technology Data Exchange (ETDEWEB)

    Drake, D.; Majdi, T.; Strack, J., E-mail: draked2@mcmaster.ca [McMaster University, Hamiltion, ON (Canada); and others

    2015-07-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  16. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  17. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  18. A research project to encourage system-compatible design of end-use appliances

    International Nuclear Information System (INIS)

    Dorr, D.; Key, T.; Sitzlar, G.

    1995-01-01

    Cooperative system compatibility research sponsored by the Canadian Electrical Association (CEA) and the Electric Power Research Institute (EPRI) for improving appliance performance deficiencies was described. Power producer and end-user compatibility concerns was addressed through the development of a System Compatibility Research Project. A list of project tasks was provided. The CEA and EPRI initiated a project to establish flicker response of various lighting systems, which included physical tests. Results of this project were presented and discussed. The incentives for developing switch mode power supplies with enhanced immunity to voltage fluctuations and short interruptions was discussed. It was concluded that power quality studies currently underway will provide designers with a profile of the expected utility environment for their products. System compatibility research will identify areas that should be addressed by standards bodies so that designers can apply applicable criteria objectives early in the appliance design process. These efforts were expected to encourage appropriate manufacturer criteria for compatibility by convincing buyers and sellers that there is a real pay back for this investment. 13 refs., 6 figs., 4 tabs

  19. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    Science.gov (United States)

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  20. Safety-evaluation report related to the renewal of the operating license for the research reactor at the Iowa State University (Docket No. 50-116)

    International Nuclear Information System (INIS)

    1983-09-01

    This Safety Evaluation Report for the application filed by the Iowa State University (ISU) for a renewal of the Class 104 Operating License R-59 to continue to operate its Argonaut-type research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Iowa State University, and is located on the ISU campus in Ames, Story County, Iowa. The staff concludes that the reactor facility can continue to be operated by ISU without endangering the health and safety of the public. The principal matters reviewed are: design, testing, and performance of the reactor components and systems; the expected consequences of credible accidents; the licensee's management organization; the method used for the control of radiological effluents; the licensee's technical specifications; financial data and information; the physical protection program; procedures for training reactor operators; and emergency plans. 11 references, 15 figures, 13 tables

  1. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  2. Design requirements document for project W-520, immobilized low-activity waste disposal

    International Nuclear Information System (INIS)

    Ashworth, S.C.

    1998-01-01

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity

  3. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  4. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  5. The experimental design of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Steven L. Sheriff; Shuoqiong. He

    1997-01-01

    The Missouri Ozark Forest Ecosystem Project (MOFEP) is an experiment that examines the effects of three forest management practices on the forest community. MOFEP is designed as a randomized complete block design using nine sites divided into three blocks. Treatments of uneven-aged, even-aged, and no-harvest management were randomly assigned to sites within each block...

  6. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  7. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  8. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  9. Application of Deterministic and Probabilistic System Design Methods and Enhancements of Conceptual Design Tools for ERA Project

    Science.gov (United States)

    Mavris, Dimitri N.; Schutte, Jeff S.

    2016-01-01

    This report documents work done by the Aerospace Systems Design Lab (ASDL) at the Georgia Institute of Technology, Daniel Guggenheim School of Aerospace Engineering for the National Aeronautics and Space Administration, Aeronautics Research Mission Directorate, Integrated System Research Program, Environmentally Responsible Aviation (ERA) Project. This report was prepared under contract NNL12AA12C, "Application of Deterministic and Probabilistic System Design Methods and Enhancement of Conceptual Design Tools for ERA Project". The research within this report addressed the Environmentally Responsible Aviation (ERA) project goal stated in the NRA solicitation "to advance vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions." To identify technology and vehicle solutions that simultaneously meet these three metrics requires the use of system-level analysis with the appropriate level of fidelity to quantify feasibility, benefits and degradations, and associated risk. In order to perform the system level analysis, the Environmental Design Space (EDS) [Kirby 2008, Schutte 2012a] environment developed by ASDL was used to model both conventional and unconventional configurations as well as to assess technologies from the ERA and N+2 timeframe portfolios. A well-established system design approach was used to perform aircraft conceptual design studies, including technology trade studies to identify technology portfolios capable of accomplishing the ERA project goal and to obtain accurate tradeoffs between performance, noise, and emissions. The ERA goal, shown in Figure 1, is to simultaneously achieve the N+2 benefits of a cumulative noise margin of 42 EPNdB relative to stage 4, a 75 percent reduction in LTO NOx emissions relative to CAEP 6 and a 50 percent reduction in fuel burn relative to the 2005 best in class aircraft. There were 5 research task associated with this research: 1) identify technology collectors, 2) model

  10. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  11. Project design of an open pit colliery in Terkidag, Turkey

    Directory of Open Access Journals (Sweden)

    H. Kose

    2010-10-01

    Full Text Available In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to relyon domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature workconcerning open pit design and production planning is explained in detail. On this basis, the project design and production planningof Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that willbe utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regardingthe project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.

  12. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  13. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  14. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  15. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  16. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kimiya, Y.; Kihara, M.; Yamane, I.

    1991-01-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  17. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kamiya, Y.; Kihara, M.; Yamane, I.

    1991-02-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  18. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  19. Cultivation of students' engineering designing ability based on optoelectronic system course project

    Science.gov (United States)

    Cao, Danhua; Wu, Yubin; Li, Jingping

    2017-08-01

    We carry out teaching based on optoelectronic related course group, aiming at junior students majored in Optoelectronic Information Science and Engineering. " Optoelectronic System Course Project " is product-designing-oriented and lasts for a whole semester. It provides a chance for students to experience the whole process of product designing, and improve their abilities to search literature, proof schemes, design and implement their schemes. In teaching process, each project topic is carefully selected and repeatedly refined to guarantee the projects with the knowledge integrity, engineering meanings and enjoyment. Moreover, we set up a top team with professional and experienced teachers, and build up learning community. Meanwhile, the communication between students and teachers as well as the interaction among students are taken seriously in order to improve their team-work ability and communicational skills. Therefore, students are not only able to have a chance to review the knowledge hierarchy of optics, electronics, and computer sciences, but also are able to improve their engineering mindset and innovation consciousness.

  20. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  1. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  2. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  3. Exploring an innovation project as source of change in organization design

    DEFF Research Database (Denmark)

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we...

  4. A proposed framework for conducting pollution prevention design assessments (P2DAs) on U.S. Department of Energy design projects

    International Nuclear Information System (INIS)

    Dorsey, J.A.

    1995-03-01

    The purpose of this manual is to provide a framework for project managers, engineers, and designers to integrate pollution prevention principles and features into DOE design projects. The framework suggested is referred to as the pollution prevention design assessment (P2DA). The P2DA is based on DOE's method for conducting pollution prevention opportunity assessments (PPOAs) on existing waste-generating operations, but the P2DA is modified because the facility or process it assesses does not physically exist during design. Before the P2DA framework is introduced in the manual, recommendations for establishing the P2DA team and budget are provided. Specific pollution prevention requirements and opportunities for each design stage as delineated in DOE Order 4700.1 Project Management System are also discussed and a sample format for drafting a P2DA report is provided in the appendix. The scope of this manual includes not only the P2DA framework, but also a background discussion of pollution prevention and related topics; the regulatory requirements mandating design for pollution prevention; the benefits and barriers of designing for pollution prevention; and the impact that pollution prevention and related environmental avoidance concepts have had on the engineering profession

  5. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  6. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    International Nuclear Information System (INIS)

    Piros, Attila; Veres, Gábor

    2013-01-01

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution

  7. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Piros, Attila, E-mail: attila.piros@gt3.bme.hu [Department of Machine and Product Design, Budapest University of Technology and Economics, Budapest (Hungary); Veres, Gábor [Department of Plasma Physics, Wigner Research Centre for Physics, Hungarian Academy of Sciences, Budapest (Hungary)

    2013-10-15

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution.

  8. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  9. Implementation of an Industrial-Based Case Study as the Basis for a Design Project in an Introduction to Mechanical Design Course

    Science.gov (United States)

    Lackey, Ellen

    2011-01-01

    The purpose of this paper is to discuss the implementation of an industrial-based case study as the basis for a design project for the Spring 2009 Introduction to Mechanical Design Course at the University of Mississippi. Course surveys documented the lack of student exposure in classes to the types of projects typically experienced by engineers…

  10. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities

  11. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  12. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  13. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    PICKETT, W.W.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure

  14. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2003-02-12

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

  15. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  16. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  17. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  18. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  19. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  20. ISU-ISU PEMBAHARUAN ISLAM DI BEBERAPA NEGARA PERSPEKTIF SEJARAH

    Directory of Open Access Journals (Sweden)

    Rusmala Dewi

    2016-07-01

    Full Text Available The collapse of the Abbasid sovereignty at the end of the period 635 H / 1258 AD political Islam has caused the loss of influence in the world. Even after the fall of the Abbasid caliphate was established in the form of several dynasties and kingdoms, such as; Mughal empire in India, Safavid empire in Persia and the Ottoman Empire in Turkey. However, the establishment of the dynasty and the government is not much help because it only operates in the field of internal development of science. In fact even the emergence of dynasties that only widen the political disintegration of the Muslim world. No doubt in the last phase of the decline of the Islamic caliphate, the Ottoman Caliphate since turned into a secular country that pioneered by Mustafa Kemal. The chronic backwardness of Islam, on the other hand Europe (Western World revolutionized civilization as aukflarung renaissance, and rationalism that gives excesses of the industrial revolution in Europe. This article will discuss about the issues of reform in the Islamic world historical perspective. تسبب انهيار لسيادة العباسية في نهاية الفترة 635 ه / 1258 م الإسلام السياسي فقدان نفوذها في العالم. حتى بعد قيام سقوط الخلافة العباسية في شكل عدة السلالات والممالك، مثل: إمبراطورية المغول في الهند، الإمبراطورية الصفوية في بلاد فارس والإمبراطورية العثمانية في تركيا. ومع ذلك، وإنشاء أسرة والحكومة لا تساعد كثيرا لأنها تعمل فقط في مجال التنمية الداخلية من العلم.في الواقع حتى ظهور السلالات التي توسع فقط التفكك السياسي للعالم الإسلامي.لا شك في المرحلة الأخيرة من ضعف الخلافة الاسلامية، الخلافة العثمانية منذ تحولت إلى دولة علمانية التي كانت رائدة على يد مصطفى كمال.التخلف المزمن من الإسلام، من ناحية أخرى أوروبا (العالم الغربي ثورة الحضارة مثل النهضة، والعقلانية التي تعطي تجاوزات الثورة الصناعية في أوروبا.هذه المادة سوف يناقش حول قضايا الإصلاح في منظور تاريخي العالم الإسلامي.

  1. A Project-Based Learning Approach to Programmable Logic Design and Computer Architecture

    Science.gov (United States)

    Kellett, C. M.

    2012-01-01

    This paper describes a course in programmable logic design and computer architecture as it is taught at the University of Newcastle, Australia. The course is designed around a major design project and has two supplemental assessment tasks that are also described. The context of the Computer Engineering degree program within which the course is…

  2. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  3. Design and delivery of the diamond double double bend achromat project

    International Nuclear Information System (INIS)

    Kay, J.; Hammond, N. P.; Thomson, A.

    2016-01-01

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  4. Design and delivery of the diamond double double bend achromat project

    Energy Technology Data Exchange (ETDEWEB)

    Kay, J., E-mail: jim.kay@diamond.ac.uk; Hammond, N. P.; Thomson, A. [Diamond Light Source, Didcot, Oxfordshire, UK, OX11 0DE (United Kingdom)

    2016-07-27

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  5. Mengukur Politisasi Agama dalam Ruang Publik: Komunikasi SARA dalam Perdebatan Rational Choice Theory

    Directory of Open Access Journals (Sweden)

    Mohammad Supriyadi

    2015-12-01

    Full Text Available Tulisan ini memberikan gambaran runtuhnya pengaruh isu primordialisme di ruang publik dan digantikan dengan kearifan konvensional. Penelitian ini mengambil aspek pengaruh isu SARA pada aspek rasionalitas pemilih. Penulis menemukan beberapa aspek yang mendukung kesimpulan penelitian, antara lain; bahwa isu SARA tidak terlalu direspek pemilih rasional. Pemilih rasional lebih melihat masalah yang ada dan mengevaluasi kinerja pemerintahan sebelumnya. Di lain pihak, emosi antusias terhadap isu etnisitas akan memantabkan pilihan politik terhadap pemilih etnis minoritas, sebagai bentuk penguatan komunitas. Dengan menggunakan pendekatan teori pilihan rasional (rational choice theory, penulis melihat bahwa komunikasi politik yang dibangun melalui isu SARA di ruang publik dalam kehidupan masyarakat modern, tidak lagi mampu memengaruhi pemilih rasional. Pemilih rasional (rational choice, menentukan pilihan berdasarkan pada keuntungan yang diperolehnya (maximizing benefit. Dalam faktor ini sikap pemilih lebih dipengaruhi karakteristik dan track record kandidat.

  6. Illicit substance use among adolescents: a matrix of prospective predictors.

    Science.gov (United States)

    Petraitis, J; Flay, B R; Miller, T Q; Torpy, E J; Greiner, B

    1998-11-01

    This paper reviews findings from 58 prospective studies of illicit substance use (ISU) among adolescents. It arranges 384 findings according to three types of influence (viz., social, attitudinal, and intrapersonal) and four levels of influence (viz., ultimate, distal, proximal, and immediate). The bulk of evidence reconfirms the importance of several predictors of ISU (e.g., intentions and prior substance-related behavior, friendship patterns and peer behaviors, absence of supportive parents, psychological temperament), reveals that a few variables thought to be well-established predictors may not be (e.g., parental behaviors, parental permissiveness, depression, low self-esteem), and uncovers several variables where findings were either sparse or inconsistent (e.g., the role of public policies concerning ISU, mass media depictions of ISU, certain parenting styles, affective states, perceptions of parental disapproval for ISU, and substance-specific refusal skills). Directions for future research are discussed.

  7. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  8. Mechanistic-Empirical (M-E) Design Implementation & Monitoring for Flexible Pavements : 2018 PROJECT SUMMARY

    Science.gov (United States)

    2018-06-01

    This document is a summary of the tasks performed for Project ICT-R27-149-1. Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were previously developed in Illinois Cooperative Highway Research Program projects IHR-...

  9. Cam Design Projects in an Advanced CAD Course for Mechanical Engineers

    Science.gov (United States)

    Ault, H. K.

    2009-01-01

    The objective of this paper is to present applications of solid modeling aimed at modeling of complex geometries such as splines and blended surfaces in advanced CAD courses. These projects, in CAD-based Mechanical Engineering courses, are focused on the use of the CAD system to solve design problems for applications in machine design, namely the…

  10. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...

  11. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  12. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  13. Advanced conceptual design report solid waste retrieval facility, phase I, project W-113

    International Nuclear Information System (INIS)

    Smith, K.E.

    1994-01-01

    Project W-113 will provide the equipment and facilities necessary to retrieve suspect transuranic (TRU) waste from Trench 04 of the 218W-4C burial ground. As part of the retrieval process, waste drums will be assayed, overpacked, vented, head-gas sampled, and x-rayed prior to shipment to the Phase V storage facility in preparation for receipt at the Waste Receiving and Processing Facility (WRAP). Advanced Conceptual Design (ACD) studies focused on project items warranting further definition prior to Title I design and areas where the potential for cost savings existed. This ACD Report documents the studies performed during FY93 to optimize the equipment and facilities provided in relation to other SWOC facilities and to provide additional design information for Definitive Design

  14. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  15. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  16. Nuclear design aspect of the Korean high intensity proton accelerator project

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Jonghwa; Song, Tae-Yung [Korea Atomic Energy Research Inst., Yusong, Taejon (Korea, Republic of)

    1998-11-01

    A plan to construct a high current proton accelerator has been proposed by KAERI. We are presenting the required nuclear design to support the project as well as a brief overview of the proposed proton accelerator. The target and core design is highlighted to show feasibility of incineration of minor actinides from the spent fuel of light water reactors. Radiation shielding and activation analyses are also important for the design and the license of the accelerator. (author)

  17. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.-J.; Huertas, F.; Ulibarri, A.

    1992-01-01

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  18. SPECIAL REPORT - The KC EMPOWER Project: Designing More Accessible STEM Learning Activities

    Directory of Open Access Journals (Sweden)

    Bob Hirshon

    2016-01-01

    Full Text Available The overall purpose of the Kinetic City (KC Empower project was to examine how informal science activities can be made accessible for students with disabilities. The premise of this project was that all students, including those with disabilities, are interested in and capable of engaging in science learning experiences, if these experiences are accessible to them. Drawing on resources from Kinetic City, a large collection of science experiments, games, and projects developed by the American Association for the Advancement of Science (AAAS, the project researched and adapted five afterschool science activities guided by universal design for learning principles.

  19. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  20. Design criteria and design basis for the 100-HR-3 and 100-KR-4 pump-and-treat projects

    International Nuclear Information System (INIS)

    McKinley, W.S.; Winters, J.N.

    1996-06-01

    The 100-HR-3 and 100-KR-4 Operable Units are located in the 100 Area at the Hanford Site in Richland, Washington. The document describes the project objectives and design criteria to be used for the 100-HR-3 and 100-KR-4 groundwater pump-and-treat design activities

  1. Optimized design for the scattering with angular limitation in projection electron-beam lithography based electron projection system

    International Nuclear Information System (INIS)

    Xiu, K.; Gibson, J. M.

    2000-01-01

    We investigate the design for a scattering with angular limitation in projection electron-beam lithography (SCALPEL) based electron projection system with a demagnification of -4. By a ''field-flip'' process we can construct a doublet in which the magnetic field has a flat feature in most of the optic column but opposite sign at two sides connected by a sharp transition region. Such a theoretical model can give a near zero chromatic aberration of rotation and much smaller field curvature and astigmatism. Compared with the conventional doublet, the total image blur caused by aberrations at 1/√(2) mm off-axis distance and 1.5 mrad semiangle aperture at the mask side is about only 24 nm for a column length of 400 mm. A shorter column, less than the current 400 mm, is also favored for further reducing the total aberration. These guarantee that we can choose a much larger aperture angle (compared with present 0.5 mrad) and beam current density in such a SCALPEL projection system to achieve higher throughput while still maintaining current resolution. A practical issue for possible magnetic lens design is also discussed. (c) 2000 American Vacuum Society

  2. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  3. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  4. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2001-05-15

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3

  5. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2000-11-03

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those

  6. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2001-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be

  7. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted

  8. Calculator: A Hardware Design, Math and Software Programming Project Base Learning

    Directory of Open Access Journals (Sweden)

    F. Criado

    2015-03-01

    Full Text Available This paper presents the implementation by the students of a complex calculator in hardware. This project meets hardware design goals, and also highly motivates them to use competences learned in others subjects. The learning process, associated to System Design, is hard enough because the students have to deal with parallel execution, signal delay, synchronization … Then, to strengthen the knowledge of hardware design a methodology as project based learning (PBL is proposed. Moreover, it is also used to reinforce cross subjects like math and software programming. This methodology creates a course dynamics that is closer to a professional environment where they will work with software and mathematics to resolve the hardware design problems. The students design from zero the functionality of the calculator. They are who make the decisions about the math operations that it is able to resolve it, and also the operands format or how to introduce a complex equation into the calculator. This will increase the student intrinsic motivation. In addition, since the choices may have consequences on the reliability of the calculator, students are encouraged to program in software the decisions about how implement the selected mathematical algorithm. Although math and hardware design are two tough subjects for students, the perception that they get at the end of the course is quite positive.

  9. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  10. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  11. The research and development of module 3D designing system for nuclear power project based on the PDMS

    International Nuclear Information System (INIS)

    Lu Qinwu; Li Yi; Wu Xiangyong

    2012-01-01

    In order to meet the demand of implementing Modularization design in CPR1000 nuclear power projects, this study aims to develop, relying on CPR1000 nuclear power project, the self-reliant module 3D design system based on the PDMS. so as to offer a convenient and effective module 3D design tool for the designers. Satisfactory results have been achieved through the test and application of two design projects. The research and application have entered the domestic advanced level. (authors)

  12. The Impact of Group Design Projects in Engineering on Achievement Goal Orientations and Academic Outcomes

    Science.gov (United States)

    Rambo-Hernandez, Karen E.; Atadero, Rebecca A.; Balgopal, Meena

    2017-01-01

    This study examined the impact of incorporating group design projects into a second-year engineering class on achievement goal orientations and two academic outcomes: concept inventory and final exam scores. In this study, two sections were taught using lecture format, but one section also completed three group design projects as part of their…

  13. Status of the mechanical design of the 650 MHz cavities for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Barbanotti, S.; Grimm, C.; Champion, M.; Foley, M.; Ginsburg, C.M.; Gonin, I.; Peterson, T.; Ristori, L.; Yakovlev, V.; /Fermilab

    2011-03-01

    In the high-energy section of the Project X Linac, acceleration of H{sup -} ions takes place in superconducting cavities operating at 650 MHz. Two families of five-cell elliptical cavities are planned: beta = 0.61 and beta = 0.9. A specific feature of the Project X Linac is low beam loading, and thus, low bandwidth and higher sensitivity to microphonics. Efforts to optimize the mechanical design of the cavities to improve their mechanical stability in response to the helium bath pressure fluctuations will be presented. These efforts take into account constraints such as cost and ease of fabrication. Also discussed will be the overall design status of the cavities and their helium jackets. The proposed design of the 3 GeV Project X superconducting (SC) Linac employs 650 MHz five-cell elliptical cavities to accelerate 1.0 mA of average H-beam current in the 160-3000 MeV energy range. The 650 MHz region of the Linac is divided into two sections with two different geometric phase velocity factors: beta = 0.61 to cover the 160-520 MeV range and beta = 0.9 to cover the 520-3000 MeV range. Approximately 40 beta = 0.61 and 150 beta = 0.9 cavities are currently planned for the project. An R&D program is in progress at FNAL, in collaboration with TJNAF and India, to develop the 650 MHz cavities for the proposed Linac design. This R&D program includes the design and fabrication of several beta = 0.61 and beta = 0.9 single-cell prototypes for evaluation prior to production of the five-cell cavities. FNAL has contracted AES to fabricate the beta = 0.9 prototypes, while TJNAF is building beta = 0.61 prototypes of their own design. In the remainder of this paper we will restrict our discussion to the five-cell beta = 0.9 cavities.

  14. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  15. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  16. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  17. Digital VLSI systems design a design manual for implementation of projects on FPGAs and ASICs using Verilog

    CERN Document Server

    Ramachandran, S

    2007-01-01

    Digital VLSI Systems Design is written for an advanced level course using Verilog and is meant for undergraduates, graduates and research scholars of Electrical, Electronics, Embedded Systems, Computer Engineering and interdisciplinary departments such as Bio Medical, Mechanical, Information Technology, Physics, etc. It serves as a reference design manual for practicing engineers and researchers as well. Diligent freelance readers and consultants may also start using this book with ease. The book presents new material and theory as well as synthesis of recent work with complete Project Designs

  18. A Nordic Project Project on High Speed Low Power Design in Sub-micron CMOS Technology for Mobile

    DEFF Research Database (Denmark)

    Olesen, Ole

    1997-01-01

    circuit design is based on state-of-the-art CMOS technology (0.5µm and below) including circuits operating at 2GHz. CMOS technology is chosen, since a CMOS implementation is likely to be significantly cheaper than a bipolar or a BiCMOS solution, and it offers the possibility to integrate the predominantly...... of including good off-chip components in the design by use of innovative, inexpensive package technology.To achieve a higher level of integration, the project will use a novel codesign approach to the design strategy. Rather than making specifications based on a purely architectural approach, the work uses...

  19. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  20. DOUBLE-WALL COLLIMATOR DESIGN OF THE SNS PROJECT

    International Nuclear Information System (INIS)

    SIMOS, N.; LUDEWIG, H.; CATALAN-LASHERAS, N.; CRIVELLO, S.

    2001-01-01

    The collimator absorber array of the Spallation Neutron Source (SNS) project is responsible for stopping the 1.0 GeV protons that are in the halo of the beam. It is estimated that 0.1% of the 2 MW beam will be intercepted by the adopted collimating scheme implemented at various sections of the beam transport and accumulation. This paper summarizes the conceptual design of the collimator absorber as well as the supporting detailed analysis that were performed and guided the design process. Key requirement in the design process is the need for the collimator beam tube to minimize beam impedance while closely following its beta function. Due to lack of available experimental data, the long-term behavior of irradiated materials in an environment where they interface with coolant flow becomes an issue. Uncertainties in the long-term behavior prompted a special double-wall design that will enable not only beam halo interception but also the efficient transfer of deposited energy both under normal and off-normal conditions to the coolant flow. The thermo-mechanical response of the double wall beam tube and of a particle bed surrounding it are discussed in detail in the paper

  1. Design and testing of a perimeter of increment threshold by projection

    OpenAIRE

    García Domene, María del Carmen; Luque Cobija, María José; Fez Saiz, Dolores de

    2017-01-01

    In the present study, we have designed and tested a perimeter for the detection of damage in the chromatic mechanisms using a video projector. To this purpose, we have characterized pixel to pixel a video projector, to account for the inhomogeneities in the projection. We have measured the tristimulus values of the projector primaries as a function of digital level, at 49 locations of the projection screen and, from them, we have arrived to a characterization model which reduces the color dif...

  2. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    Science.gov (United States)

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  3. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Enforceability of design concept and... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... determinations for a transportation plan or TIP and are included in the project design concept and scope which is...

  4. How does sustainability certification affect the design process? Mapping final design projects at an architectural office

    DEFF Research Database (Denmark)

    Landgren, Mathilde; Jensen, Lotte Bjerregaard

    2017-01-01

    process and informing the industry of them. This has led to optimised design processes such as Integrated Energy Design, in which many decisions related to energy consumption and indoor climate are made in the early design stages. The current tendency is to use an expanded notion of sustainability......, derived from the sustainability certification system itself, and to apply it even in the early design process. This perspective emphasises all phases of the life cycle of a building. The goal of the present study was to map how a Danish architectural office approached sustainability in the projects......The context of the study is the very strict regulation of energy consumption for operating buildings in Denmark. It is difficult to meet the requirements by system optimisation in the final design phase, so recent research has focused on ways of meeting the target by adapting the whole design...

  5. Teaching Sustainable Design Using BIM and Project-Based Energy Simulations

    Directory of Open Access Journals (Sweden)

    Zhigang Shen

    2012-08-01

    Full Text Available The cross-disciplinary nature of energy-efficient building design has created many challenges for architecture, engineering and construction instructors. One of the technical challenges in teaching sustainable building design is enabling students to quantitatively understand how different building designs affect a building’s energy performance. Concept based instructional methods fall short in evaluating the impact of different design choices on a buildings’ energy consumption. Building Information Modeling (BIM with energy performance software provides a feasible tool to evaluate building design parameters. One notable advantage of this tool is its ability to couple 3D visualization of the structure with energy performance analysis without requiring detailed mathematical and thermodynamic calculations. Project-based Learning (PBL utilizing BIM tools coupled with energy analysis software was incorporated into a senior level undergraduate class. Student perceptions and feedback were analyzed to gauge the effectiveness of these techniques as instructional tools. The findings indicated that BIM-PBL can be used to effectively teach energy-efficient building design and construction.

  6. PROJECT ENGINEERING DATA MANAGEMENT AT AUTOMATED PREPARATION OF DESIGN DOCUMENTATION

    Directory of Open Access Journals (Sweden)

    A. V. Guryanov

    2017-01-01

    Full Text Available We have developed and realized instrumental means for automated support of end-to-end design process for design documentation on a product at the programming level. The proposed decision is based on processing of the engineering project data that are contained in interdependent design documents: tactical technical characteristics of products, data on the valuable metals contained in them, the list of components applied in a product and others. Processing of engineering data is based on their conversion to the form provided by requirements of industry standards for design documentation preparation. The general graph of the design documentation developed on a product is provided. The description of the developed software product is given. Automated preparation process of interdependent design documents is shown on the example of preparation of purchased products list. Results of work can be used in case of research and development activities on creation of perspective samples of ADP equipment.

  7. Research and Development Projects with ICT and students as learning designers in Primary Schools

    DEFF Research Database (Denmark)

    Levinsen, Karin; Sørensen, Birgitte Holm; Tosca, Susana

    2014-01-01

    In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... to the need to strengthen the populations’ digital literacy and 21st century competencies. The call’s scope was research and development projects as pilot school experiments in relation to five selected areas. The selected projects should contribute with new generalizable and practice oriented knowledge...... of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices...

  8. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  9. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  10. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository.

  11. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    International Nuclear Information System (INIS)

    Schroeder, B.K.

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository

  12. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  13. Nature-inspired design strategies in sustainable product development : A case study of student projects

    NARCIS (Netherlands)

    De Pauw, I.C.; Karana, E.; Kandachar, P.V.

    2012-01-01

    In design practice, Nature-Inspired Design Strategies (NIDS) can be applied when developing sustainable products. However, knowledge on how this actually helps designers is lacking. This study explores the effects of applying Cradle to Cradle and Biomimicry in student projects, as compared to using

  14. Case Study of a Project-Based Learning Course in Civil Engineering Design

    Science.gov (United States)

    Gavin, K.

    2011-01-01

    This paper describes the use of project-based learning to teach design skills to civil engineering students at University College Dublin (UCD). The paper first considers the development of problem-based leaning (PBL) as a tool in higher education. The general issues to be considered in the design of the curriculum for a PBL module are reviewed.…

  15. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them.

  16. Architecture of the Yeast Mitochondrial Iron-Sulfur Cluster Assembly Machinery

    Science.gov (United States)

    Ranatunga, Wasantha; Gakh, Oleksandr; Galeano, Belinda K.; Smith, Douglas Y.; Söderberg, Christopher A. G.; Al-Karadaghi, Salam; Thompson, James R.; Isaya, Grazia

    2016-01-01

    The biosynthesis of Fe-S clusters is a vital process involving the delivery of elemental iron and sulfur to scaffold proteins via molecular interactions that are still poorly defined. We reconstituted a stable, functional complex consisting of the iron donor, Yfh1 (yeast frataxin homologue 1), and the Fe-S cluster scaffold, Isu1, with 1:1 stoichiometry, [Yfh1]24·[Isu1]24. Using negative staining transmission EM and single particle analysis, we obtained a three-dimensional reconstruction of this complex at a resolution of ∼17 Å. In addition, via chemical cross-linking, limited proteolysis, and mass spectrometry, we identified protein-protein interaction surfaces within the complex. The data together reveal that [Yfh1]24·[Isu1]24 is a roughly cubic macromolecule consisting of one symmetric Isu1 trimer binding on top of one symmetric Yfh1 trimer at each of its eight vertices. Furthermore, molecular modeling suggests that two subunits of the cysteine desulfurase, Nfs1, may bind symmetrically on top of two adjacent Isu1 trimers in a manner that creates two putative [2Fe-2S] cluster assembly centers. In each center, conserved amino acids known to be involved in sulfur and iron donation by Nfs1 and Yfh1, respectively, are in close proximity to the Fe-S cluster-coordinating residues of Isu1. We suggest that this architecture is suitable to ensure concerted and protected transfer of potentially toxic iron and sulfur atoms to Isu1 during Fe-S cluster assembly. PMID:26941001

  17. Teaching, Doing, and Sharing Project Management in a Studio Environment: The Development of an Instructional Design Open-Source Project Management Textbook

    Science.gov (United States)

    Randall, Daniel L.; Johnson, Jacquelyn C.; West, Richard E.; Wiley, David A.

    2013-01-01

    In this article, the authors present an example of a project-based course within a studio environment that taught collaborative innovation skills and produced an open-source project management textbook for the field of instructional design and technology. While innovation plays an important role in our economy, and many have studied how to teach…

  18. [Theories and methodologies of engineering designs on sustainable agricultural land consolidation project--a case study of Xuemeiyang land consolidation project in Changtai County, Fujian Province].

    Science.gov (United States)

    Ye, Yanmei; Wu, Cifang; Cheng, Chengbiao; Qiu, Lingzhang; Huang, Shengyu; Zheng, Ruihui

    2002-09-01

    The concept and characteristics of engineering designs on sustainable agricultural land consolidation project were discussed in this paper. Principles, basic methods and procedures of engineering designs on agricultural land consolidation project were put forward, which were successfully adopted for designing agricultural land consolidation in Xuemeiyang region of Changtai County, including diversity designs of sustainable land use, engineering designs of soil improvement, roads, ditches, and drains for protecting existent animal environments, and design of ecological shelter-forests in farmland. Moreover, from sustainable economic, ecological and social points, the results of these engineering designs were evaluated based on fouteen important indexes. After carrying out these engineeringdesigns, the eco-environments and agricultural production conditions were significantly improved, and the farm income was increased in planned regions.

  19. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    2016-01-01

    Internationally, new pedagogical approaches emphasizing collaboration or learning in networks have been developed following the introduction of new technologies, especially the spread of social media. It is interesting to see such pedagogical developments in relation to similar approaches......, developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...... digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...

  20. ISU Team Project: An Integral View on Space Debris Mitigation and Removal

    Science.gov (United States)

    Maier, Philipp; Ricote Navarro, Carmon; Jehn, Rudiger; Gini, Andrea; Faure, Pauline; Adriaensen, Maarten; Datta, Iman; Hilbich, Daniel; Jacimovic, Aleksandar; Jacques, Lionel; Penent, Guilhem; Sinn, Thomas; Shioi, Hiroaki

    2013-08-01

    The issue of space debris poses challenges not only in technical, but also legal, political and economic dimensions. A sustainable solution needs to take into account all of them. This paper investigates such a potential solution in a multidisciplinary approach. To this end, it addresses the effectiveness of the existing debris mitigation guidelines, and identifies technical improvements for mitigation. It continues examining technical concepts for debris removal and performing proper cost-benefit trade-offs. The results of new simulations to assess the damage cost caused by space debris are presented. Based on these findings, an organizational framework and political recommendations are developed which will enable a sustainable use of space starting in 2020. The findings are compiled into a roadmap, which outlines 1) a path to the full adherence to debris mitigation guidelines and 2) the removal of ten large pieces of debris per year by a dedicated international organization, including expected expenditures necessary for its implementation.

  1. The ZAP Project: Designing Interactive Computer Tools for Learning Psychology

    Science.gov (United States)

    Hulshof, Casper; Eysink, Tessa; de Jong, Ton

    2006-01-01

    In the ZAP project, a set of interactive computer programs called "ZAPs" was developed. The programs were designed in such a way that first-year students experience psychological phenomena in a vivid and self-explanatory way. Students can either take the role of participant in a psychological experiment, they can experience phenomena themselves,…

  2. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  3. Smart energy households' pilot projects in the Netherlands with a design-driven approach

    NARCIS (Netherlands)

    Geelen, D.V.; Scheepens, A.; Kobus, C.; Obinna, U.; Mugge, R.; Schoormans, J.; Reinders, Angelina H.M.E.

    2013-01-01

    Residential smart grid projects can be evaluated by a design-driven approach, which focuses on gaining insights for successful product and service development by taking the end-users as a starting point. Because only little experience exists with this design-driven approach, this paper addresses how

  4. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  5. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik

    2010-01-01

    Reaction Engineering. In order to incorporate reactor design into process design in a meaningful way, the teachers of the respective courses need to collaborate (Standard 9 – Enhancement of Faculty CDIO skills). The students also see that different components of the chemical engineering curriculum relate......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...... of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B...

  6. Conceptual design report, 200 Area sanitary sewer system: Project 96L-EWL-116

    International Nuclear Information System (INIS)

    Pursley, D.L.

    1994-01-01

    Project L-116 will install an integrated sanitary sewer system in the 200 Area. This new system will connect existing sewer systems for facilities that have a foreseeable future, provide capacity and routing for future facilities, and install new septic sewer systems for existing facilities that cannot be feasibly connected to the new sewer system and have a mission that will extend beyond the year 2000. Project L-116 will construct a sanitary sewer collection, treatment, and disposal system for facilities in the 200-East and -West Areas and adjacent areas located on the 200 Area plateau. The existing septic systems will be abandoned or decommissioned in accordance with applicable Washington State and local codes and regulations. The conceptual design for the sanitary sewer system is designed around population forecasts of 5,000 people for 200-West Area and 9,000 people for 200-East Area. The definitive design will be based on the latest forecast populations at the time definitive design is initiated

  7. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  8. MIT/Draper Technology Development Partnership Project: Systems Analysis and On-Station Propulsion Subsystem Design

    National Research Council Canada - National Science Library

    Conklin, Theodore

    1998-01-01

    The objective of this thesis is to describe the process for, and the overall design that resulted from the MIT/Draper Project from August, 1996 to May, 1997, including the specific design of the on...

  9. Design of retinal-projection-based near-eye display with contact lens.

    Science.gov (United States)

    Wu, Yuhang; Chen, Chao Ping; Mi, Lantian; Zhang, Wenbo; Zhao, Jingxin; Lu, Yifan; Guo, Weiqian; Yu, Bing; Li, Yang; Maitlo, Nizamuddin

    2018-04-30

    We propose a design of a retinal-projection-based near-eye display for achieving ultra-large field of view, vision correction, and occlusion. Our solution is highlighted by a contact lens combo, a transparent organic light-emitting diode panel, and a twisted nematic liquid crystal panel. Its design rules are set forth in detail, followed by the results and discussion regarding the field of view, angular resolution, modulation transfer function, contrast ratio, distortion, and simulated imaging.

  10. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    International Nuclear Information System (INIS)

    1995-01-01

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project

  11. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  12. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    Energy Technology Data Exchange (ETDEWEB)

    Benoît, Fabrice, E-mail: fabrice-2.benoit@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Allegretti, Ludovic [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Aumeunier, Marie-Hélène [OPTIS, ZE de La Farlède, F-83078 Toulon Cedex 9 (France); Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Robert, Julien [SOFYNE, F-69800 Saint Priest (France)

    2014-10-15

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule.

  13. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    International Nuclear Information System (INIS)

    Benoît, Fabrice; Allegretti, Ludovic; Aumeunier, Marie-Hélène; Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène; Robert, Julien

    2014-01-01

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule

  14. Experimental and theoretical analysis for improved microscope design of optical projection tomographic microscopy.

    Science.gov (United States)

    Coe, Ryan L; Seibel, Eric J

    2013-09-01

    We present theoretical and experimental results of axial displacement of objects relative to a fixed condenser focal plane (FP) in optical projection tomographic microscopy (OPTM). OPTM produces three-dimensional, reconstructed images of single cells from two-dimensional projections. The cell rotates in a microcapillary to acquire projections from different perspectives where the objective FP is scanned through the cell while the condenser FP remains fixed at the center of the microcapillary. This work uses a combination of experimental and theoretical methods to improve the OPTM instrument design.

  15. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  16. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    Science.gov (United States)

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  17. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  18. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  19. Balancing research and organizational capacity building in front-end project design

    DEFF Research Database (Denmark)

    Hjortsø, Carsten Nico Portefée; Meilby, Henrik

    2013-01-01

    is more complex. We identify 11 specific factors influencing front-end project management related to structure, process and relationship, and we theorize about how these factors influence the choice between research and more general capacity development activities. Copyright © 2013 John Wiley & Sons, Ltd......, but in order for partnerships to comply with general governance-level recommendations, a better understanding is needed of how specific context-dependent factors influence the development and execution of projects. In this article, we aim to contribute to the understanding of factors influencing the design...... phase of RCB partnerships and examine how they influence the balance between performing collaborative research and developing general organizational capacity. Data collection was based on a survey (n = 25), and individual interviews and focus group discussions with 17 Danish project managers from...

  20. Preparing future space leaders - International Space University

    Science.gov (United States)

    Stone, Barbara A.; Van Reeth, George P.

    1992-01-01

    The International Space University (ISU) concept of developing a cadre of space professionals that will lead the universities and industries into space is discussed. ISU is an innovative, permanent worldwide organization for training and academic instruction in all aspects of space studies. ISU's major goal is to provide the young professional academic instruction in technical and nontechnical areas of modern space exploration and research, and a forum to exchange ideas and develop both personal and professional ties at an international level.

  1. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  2. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    Science.gov (United States)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  3. Redeveloping Nicosia International Airport: an extroverting Y2 group design project

    Science.gov (United States)

    Yiatros, S.

    2017-11-01

    This article follows the timeline of the 'Nicosia International Airport: The Return' Integrated Design Project which was undertaken by Year 2 students of Civil Engineering and Geomatics at the Cyprus University of Technology in Cyprus. The Nicosia International Airport was the first and main airport of the Republic of Cyprus since its independence from the British Empire in 1960. The airport remains closed since the Turkish invasion of 1974 and is located in the buffer zone administered by the United Nations Peace-keeping Force in Cyprus. In this work, the innovative aspects of a project to inspire and train engineering students are highlighted, while special attention is given to the dissemination and outreach of the project through the social media. The attracted attention of national media and the project's impact on the local society had a cyclical effect, further inspiring students to work hard and act as responsible professional engineers. 'Nicosia International Airport: The Return' is a case study of how an academic engineering project can have societal impact, by inspiring students, engaging practitioners from a wide spectrum of disciplines, captivating the general public and raising the profile of Civil Engineering in the society.

  4. Making Communication Matter: Integrating Instruction, Projects and Assignments to Teach Writing and Design

    Science.gov (United States)

    Riddell, William T.; Courtney, Jennifer; Constans, Eric; Dahm, Kevin; Harvey, Roberta; von Lockette, Paris

    2010-01-01

    An integrated technical writing and design course has been developed at Rowan University. This course was developed using aspects of project-based learning and recent discussions about design education, as well as pedagogical approaches from the write-to-learn and the writing in the disciplines (WID) movements. The result is a course where the…

  5. Waste Receiving and Processing Facility, Module 1: Volume 7, Project design criteria

    International Nuclear Information System (INIS)

    1992-03-01

    This Project Design Criteria document for the WRAP facility at the Hanford Site is presented within a systems format. The WRAP Module 1 facility has been categorized into eight (8) engineering systems for design purposes. These systems include: receiving, shipping and storage, nondestructive assay/nondestructive examination (NDA/NDE), waste process, internal transportation, building, heating ventilation and air conditioning (HVAC), process control, and utilities. Within each system section of this document, the system-specific requirements are identified. The scope of the system is defined, the design goals are identified and the functional requirements are detailed

  6. Projecting the Future for Design Science Research: An Action‐Case Based Analysis

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2015-01-01

    and theories appears to be a key challenge. In this paper we commence with a DESRIST paper from 2012 that instantiated design principles in an artifact for a bank. That paper included plans and techniques for future use of its principles (propagation), including prescriptions for a five-phase adoption process...... or theories have stimulated many actual projections. We demonstrate these concepts in a case study of propagation: a chemical manufacturer and service provider that adopted the design principles arising from that 2012 DESRIST banking-based design science research. We conclude that generalizability is too well...

  7. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  8. Design basis event consequence analyses for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Orvis, D.D.; Haas, M.N.; Martin, J.H.

    1997-01-01

    Design basis event (DBE) definition and analysis is an ongoing and integrated activity among the design and analysis groups of the Yucca Mountain Project (YMP). DBE's are those that potentially lead to breach of the waste package and waste form (e.g., spent fuel rods) with consequent release of radionuclides to the environment. A Preliminary Hazards Analysis (PHA) provided a systematic screening of external and internal events that were candidate DBE's that will be subjected to analyses for radiological consequences. As preparation, pilot consequence analyses for the repository subsurface and surface facilities have been performed to define the methodology, data requirements, and applicable regulatory limits

  9. Citizen participation, indispensable factor in the generation of urban design projects that respond to the needs of users in Mexico

    Directory of Open Access Journals (Sweden)

    Flavio Franco Muñoz

    2015-09-01

    Full Text Available The relationship between urban design projects with users, it is evident that the importance of public participation in the development of the realization and implementation of these projects; being one of the aspects that aroused the interest in developing the research project "Citizen Participation and rehabilitation of public spaces in the downtown area of Aguascalientes. The cases of Madero and Venustiano Carranza Zaragoza streets" in the which it aims to propose a model for the process of developing an urban design project that incorporates citizen participation effectively, based on the analysis of cases of Madero and Venustiano Carranza Zaragoza streets and analysis theoretical framework of the research project; This research is being done within the Doctorate of Science of the Anthropic Areas, which is being conducted at the Autonomous University of Aguascalientes. The aim expose in this paper is the importance of public participation in a key stage in the process of realization and implementation of a project of urban design, urban planning stage, to substantiate the development stage of the project design city; this proposal derived from the analysis of the knowledge acquired through the research project being conducted within the PhD. The set in our research project to develop the stages in the process of realization and implementation of an urban design project, made up, urban planning, studies to substantiate the project, zoning scheme, the draft, the project executive, project implementation and monitoring, control and evaluation of urban design project realized; allowed to establish the stages where citizen participation is essential, and these stages, identifying the aspects that will be enriched with the knowledge gained from this participation. Considering the participation of citizens from the realization of urban development programs, whether in cities, partial, sectoral or development schemes localities, allow to be

  10. The Effect of STEM Learning through the Project of Designing Boat Model toward Student STEM Literacy

    Science.gov (United States)

    Tati, T.; Firman, H.; Riandi, R.

    2017-09-01

    STEM Learning focusses on development of STEM-literate society, the research about implementation of STEM learning to develope students’ STEM literacy is still limited. This study is aimed to examine the effect of implementation STEM learning through the project of designing boat model on students STEM literacy in energy topic. The method of this study was a quasi-experiment with non-randomized pretest-posttest control group design. There were two classes involved, the experiment class used Project Based Learning with STEM approach and control class used Project-Based Learning without STEM approach. A STEM Literacy test instrument was developed to measure students STEM literacy which consists of science literacy, mathematics literacy, and technology-engineering literacy. The analysis showed that there were significant differences on improvement science literacy, mathematics technology-engineering between experiment class and control class with effect size more than 0.8 (large effect). The difference of improvement of STEM literacy between experiment class and control class is caused by the existence of design engineering activity which required students to apply the knowledge from every field of STEM. The challenge that was faced in STEM learning through design engineering activity was how to give the students practice to integrate STEM field in solving the problems. In additional, most of the students gave positive response toward implementation of STEM learning through design boat model project.

  11. Mo-Si-B Alloys and Diboride Systems for High Enthalpy Environments: Design and Evaluation

    Science.gov (United States)

    2016-01-15

    material scientists from two universities (ISU and UW-M) and aerothermodynamicists from two institutions (SRI and UVM), each group pursued individual...that we would have hoped, but each group has benefited from the learning engendered from this ambitious collaborative investigation. While it was...significant amount of WO3 remaining entrapped in the scale. The uncoated alloy presents a virgin surface containing all four elements Mo, W, Si and

  12. Integrating Project Management, Product Design with Industry Sponsored Projects provides Stimulating Senior Capstone Experiences

    Directory of Open Access Journals (Sweden)

    Phillip A. Sanger

    2011-07-01

    Full Text Available

    Abstract ¾ Many students are uncomfortable with real world engineering problems where needs and requirements must be concretely defined and the selection of design solutions is not black and white. This paper describes a two semester, multi-disciplinary senior capstone project for students from three Engineering and Technology Department programs (electrical engineering, electrical and computer engineering technology, and engineering technology that brings together the tools of project management and the creative product development process into industry sponsored projects.  The projects are fully integrated with the Center for Rapid Product Realization with its dual goals of economic development and enhanced learning.  The stage/gate development process is used with six formal reviews covering the development of the proposal through to the fabrication and testing of the project’s output.  Over the past four years thirty five (35 projects have been undertaken with students getting an exciting

  13. Alternative Evaluation Designs for Data-Centered Technology-Based Geoscience Education Projects

    Science.gov (United States)

    Zalles, D. R.

    2012-12-01

    This paper will present different strategies for how to evaluate contrasting K-12 geoscience classroom-based interventions with different goals, leveraging the first author's experiences as principal investigator of four NSF and NASA-funded geoscience education projects. Results will also be reported. Each project had its own distinctive features but all had in common the broad goal of bringing to high school classrooms uses of real place-based geospatial data to study the relationships of Earth system phenomena to climate change and sustainability. The first project's goal was to produce templates and exemplars for curriculum and assessment designs around studying contrasting geoscience topics with different data sets and forms of data representation. The project produced a near transfer performance assessment task in which students who studied climate trends in Phoenix turned their attention to climate in Chicago. The evaluation looked at the technical quality of the assessment instrument as measured by inter-rater reliability. It then analyzed the assessment results against student responses to the instructional tasks about Phoenix. The evaluation proved useful in pinpointing areas of student strength and weakness on different inquiry tasks, from simple map interpretation to analysis of contrasting claims about what the data indicate. The goal of the second project was to produce an exemplar curriculum unit that bridges Western science and traditional American Indian ecological knowledge for student learning and skill building about local environmental sustainability issues. The evaluation looked at the extent to which Western and traditional perspectives were incorporated into the design of the curriculum. The curriculum was not constructed with a separate assessment, yet evidence centered design was utilized to extrapolate from the exemplar unit templates for future instructional and assessment tasks around other places, other sustainability problems, and

  14. Twitter expands the reach and engagement of a national scientific meeting: the Irish Society of Urology.

    Science.gov (United States)

    Nason, G J; O'Kelly, F; Bouchier-Hayes, D; Quinlan, D M; Manecksha, R P

    2015-09-01

    Social media is the interaction among people in which they create, share or exchange information and ideas in virtual communities and web-based networks. This year, the Irish Society of Urology (ISU) expanded its involvement in social media with a preregistered Twitter hashtag (#ISU14) for the annual meeting. The aim of this study was to highlight the use of Twitter at an annual national meeting held in 2014. The Symplur healthcare analytics website was used to prospectively examine traffic related to the 2014 ISU Annual Meeting. This feature was used to generate statistics for the number of impressions, unique tweets (excluding retweets) and distinct contributors who used the indexing hashtag #ISU14. Individual tweets were assessed using the conference hashtag on the Twitter website. The total number of attendees at the conference was 119, and 99 individuals participated in Twitter using the conference hashtag (#ISU14). 31 % of attendees participated in tweeting at the conference. Over the course of the conference, a total of 798 unique tweets were generated, creating over 665,000 impressions in cyberspace. 590 (73.9 %) tweets were generated from attendees at the conference, while 26.1 % of tweets were from virtual followers. 702 (87.9 %) tweets were from urologists and 439 (55 %) tweets were of scientific nature. Tweet activity peaked during the guest lectures on both days. Twitter use at the ISU has been shown to facilitate interaction between delegates and allows users to follow as well as participate from afar.

  15. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  16. Planeerimine algab kultuuriloo tundmisest / Riin Alatalu

    Index Scriptorium Estoniae

    Alatalu, Riin, 1968-

    2011-01-01

    Viljandimaal Õisu mõisas 10.11.2011 toimunud seminarist "Kultuuriloost lähtuv planeerimine". Ettekannetest, 1. juunil jõustunud muinsuskaitseseaduse muudatustest. Õisu mõisa tulevikuplaanidest. Uuringute ja projektidega tegeleb OÜ Vana Tallinn, pargiga OÜ Artes Terrae

  17. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report - Project A.5 and A.6

    International Nuclear Information System (INIS)

    ARD, K.E.

    2000-01-01

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01

  18. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  19. Using Vector Projection Method to evaluate maintainability of mechanical system in design review

    International Nuclear Information System (INIS)

    Chen Lu; Cai Jianguo

    2003-01-01

    Maintainability of a mechanical system is one of the system design parameters that has a great impact in terms of ease of maintenance. In this article, based on the definition of the terms of maintenance and maintainability, an important tool of Design for Maintenance is developed as a way to improve maintainability through design. A set of standard and organized guidelines is provided and maintainability factors in terms of physical design, logistics support and ergonomics are identified. As a specific application of design review, a methodology so called Vector Projection Method is developed to evaluate the maintainability of the mechanical system. Lastly, an example is discussed

  20. Design reality gap issues within an ICT4D project:an assessment of Jigawa State Community Computer Center

    OpenAIRE

    Kanya, Rislana Abdulazeez; Good, Alice

    2013-01-01

    This paper evaluates the Jigawa State Government Community Computer centre project using the design reality gap framework. The purpose of this was to analyse the shortfall between design expectations and implementation realities, in order to find out the current situation of the project. Furthermore to analyse whether it would meet the key stakeholder’s expectation. The Majority of Government ICT Projects is classified as either failure or partial failure. Our research will underpin a case st...

  1. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  2. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  3. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    The pattern of information flow through the network of interdependent design activities is thought to be an important determinant of engineering design process results. A previously unexplored aspect of such patterns relates to the temporal dynamics of information transfer between activities...... design process and thus support theory-building toward the evolution of information flows through systems engineering stages. Implications include guidance on how to analyze and predict information flows as well as better planning of information flows in engineering design projects according...

  4. The Design and Development of a Computerized Tool Support for Conducting Senior Projects in Software Engineering Education

    Science.gov (United States)

    Chen, Chung-Yang; Teng, Kao-Chiuan

    2011-01-01

    This paper presents a computerized tool support, the Meetings-Flow Project Collaboration System (MFS), for designing, directing and sustaining the collaborative teamwork required in senior projects in software engineering (SE) education. Among many schools' SE curricula, senior projects serve as a capstone course that provides comprehensive…

  5. Conceptual design statement of work for the immobilized low-activity waste disposal facility, project W-520

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1998-01-01

    This Statement of Work outlines the deliverables and schedule for preparation of the Project W-520 Conceptual Design Report, including, work plans, site development plan, preliminary safety evaluation, and conceptual design

  6. Evaluation of different Project Based Learning designs in an MSc degree

    Directory of Open Access Journals (Sweden)

    Carmen García Berdonés

    2014-03-01

    Full Text Available The design and implementation of different Project Based Learning (PBL approaches are presented in this paper. All of them were carried out in the framework of the MSc degree in Electronic Systems for Smart Environments from the University of Malaga. Four subjects were developed using different values of the three main parameters of PBL: teamwork, self-guided learning and project complexity. During two academic years, several indicators were used to evaluate these experiences: compliance with subject time schedules, scores obtained for the students, interaction of each student in his team and satisfaction of students with the experiences. Our results encourage the use of PBL in bachelor degrees but, at the same time, confirm that PBL implementation is not a trivial task when projects are complex or when a high level of autonomous learning is required from students. Teamwork difficulties have also been found. So, we discuss the need of reaching a minimum level of proficiency in some key competencies before using PBL.

  7. Statement on current progress of the EPR project. Basic Design phase concluded

    International Nuclear Information System (INIS)

    Lamprecht, F.

    1997-01-01

    Against the background of expected increasing demand for electric power worldwide it is obvious that any existing technology for electricity generation will be required in the future to meet the demand, just as well as technology improvements. Nuclear industry's answer to this challenge are activities for further evolution of the PWR concept as a joint venture of France and Germany for development of the European Pressurized Water Reactor (EPR). The project participants are reactor manufacturers and operators of both countries as well as organisations responsible for reactor safety. The Basic Design phase which started in 1995, after prior definition of the common safety philosophy, has recently been concluded. The results have been presented at a meeting in October 1997 in Cologne, organised by KTG and SFEN, the countries' respective nuclear societies. The broad statement is that project work was successful in achieving two major objectives: A well-balanced safety concept, and a competitive design. (orig./CB) [de

  8. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  9. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; David Duncan; Joan Connolly; Margaret Hinman; Charles Marcinkiewicz; Gary Mecham

    2011-03-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  10. Conceptual design of a moving-ring fusion reactor. AP-3229 Research Project 922, annual report, October 1983

    International Nuclear Information System (INIS)

    1983-10-01

    This report concludes a two-year project to design a prototype (roughly 100 MW(e) net) fusion power plant which places emphasis on commercial needs and to outline a development plan for it. This project is a follow-on to an earlier design of a small (11 MW(e) net) pilot power plant (EPRI Report AP-1544), which is included in the development plan as a step to be built before this prototype. The prototype design put major attention on minimizing nuclear issues. Other commercial matters, including suitability for scaling to a wide range of sizes, were also very important. The design, the earlier pilot design, and the extrapolation of these to commercial size designs identify gaps between required technical features and current technical knowledge. These gaps set targets for experiments and technology programs. These programs and designs define the development plan

  11. Educational Policy Studies: Old Wine in a New Bottle.

    Science.gov (United States)

    Eisele, Chris

    1985-01-01

    As educational policy studies have multiplied, Illinois State University's (ISU) Educational Administration and Foundations Department developed a new series of policy studies grounded in historical and philosophical methodology. Content of one course is described, and benefits of the ISU model are discussed. (MT)

  12. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  13. PERBINCANGAN MENGENAI HUKUMAN MATI TERKAIT KASUS BALI NINE DAN MARY JANE DALAM SITUS JEJARING SOSIAL TWITTER

    Directory of Open Access Journals (Sweden)

    Jimi Narotama Mahameruaji

    2016-06-01

    Full Text Available Twitter telah menjadi alat atau media komunikasi yang sangat populer diantara para pengguna Internet. Melalui Twitter, penggunanya dapat berbagi cerita hidup mereka sehari-hari, melakukan perbincangan dengan pengguna lain dan juga mengekspresikan pendapat mereka. Twitter juga dapat dilihat sebagai sebuah wadah untuk melakukan perbincangan politik dan isu-isu publik. Oleh karena itu, peran Twitter terkait partisipasi publik, kampanye, dan pembentukan opini publik kini semakin diperhitungkan (Jungherr, 2015. Fokus penelitian ini tentang perbincangan para pengguna Twitter di Indonesia mengenai peristiwa hukuman mati kasus narkoba Bali Nine dan Mary Jane. Penelitian ini bertujuan untuk mengetahui apa ragam perbincangan yang terjadi di antara para pengguna Twitter Indonesia terkait kasus hukuman mati tersebut, apa argumen yang muncul terkait penolakan maupun dukungan terhadap isu hukuman mati, dan juga siapa saja Twitter Influencer yang berperan dalam isu ini.   DOI: 10.24198/jkk.vol4n1.5

  14. SEU blending project, concept to commercial operation, Part 4: engineering design

    International Nuclear Information System (INIS)

    Ingalls, D.G.; Ioffe, M.S.; Oliver, A.J.; Smith, T.P.; Ozberk, E.

    2005-01-01

    The process development test program for production of Slightly Enriched Uranium (SEU) dioxide powder and Blend of Dysprosium and Uranium (BDU) oxide powder was initiated almost simultaneously with the conceptual engineering study for the commercial plant in 2001. During the very early phases of the project it was recognized that meeting the challenging requirements would necessitate wide expertise from different departments within the Cameco operations as well as consultants from outside the Company. The project team formed reflected this recognition. The conceptual engineering study was the lead into preparation of the engineering design study in 2003, which provided the process description based on the research and development program being carried out at Cameco Technology Development (CTD), project description, and project cost estimates. The detailed engineering phase commenced in June 2004 and was in progress at the the time when this paper was presented. The detailed engineering phase is addressing all aspects of the commercial plant including all health and safety, environment and security related issues, nuclear safety, training program, all product quality assurance issues, quality management issues, powder and fuel bundle transportation issues, all regulatory requirements, establishing project execution plans and budget, and strategies to control the costs. At the end of the detailed engineering phase, construction packages will be ready for tender, and major pieces of equipment will be selected and procured. (author)

  15. The Genome of the Netherlands: design, and project goals

    Science.gov (United States)

    Boomsma, Dorret I; Wijmenga, Cisca; Slagboom, Eline P; Swertz, Morris A; Karssen, Lennart C; Abdellaoui, Abdel; Ye, Kai; Guryev, Victor; Vermaat, Martijn; van Dijk, Freerk; Francioli, Laurent C; Hottenga, Jouke Jan; Laros, Jeroen F J; Li, Qibin; Li, Yingrui; Cao, Hongzhi; Chen, Ruoyan; Du, Yuanping; Li, Ning; Cao, Sujie; van Setten, Jessica; Menelaou, Androniki; Pulit, Sara L; Hehir-Kwa, Jayne Y; Beekman, Marian; Elbers, Clara C; Byelas, Heorhiy; de Craen, Anton J M; Deelen, Patrick; Dijkstra, Martijn; den Dunnen, Johan T; de Knijff, Peter; Houwing-Duistermaat, Jeanine; Koval, Vyacheslav; Estrada, Karol; Hofman, Albert; Kanterakis, Alexandros; Enckevort, David van; Mai, Hailiang; Kattenberg, Mathijs; van Leeuwen, Elisabeth M; Neerincx, Pieter B T; Oostra, Ben; Rivadeneira, Fernanodo; Suchiman, Eka H D; Uitterlinden, Andre G; Willemsen, Gonneke; Wolffenbuttel, Bruce H; Wang, Jun; de Bakker, Paul I W; van Ommen, Gert-Jan; van Duijn, Cornelia M

    2014-01-01

    Within the Netherlands a national network of biobanks has been established (Biobanking and Biomolecular Research Infrastructure-Netherlands (BBMRI-NL)) as a national node of the European BBMRI. One of the aims of BBMRI-NL is to enrich biobanks with different types of molecular and phenotype data. Here, we describe the Genome of the Netherlands (GoNL), one of the projects within BBMRI-NL. GoNL is a whole-genome-sequencing project in a representative sample consisting of 250 trio-families from all provinces in the Netherlands, which aims to characterize DNA sequence variation in the Dutch population. The parent–offspring trios include adult individuals ranging in age from 19 to 87 years (mean=53 years; SD=16 years) from birth cohorts 1910–1994. Sequencing was done on blood-derived DNA from uncultured cells and accomplished coverage was 14–15x. The family-based design represents a unique resource to assess the frequency of regional variants, accurately reconstruct haplotypes by family-based phasing, characterize short indels and complex structural variants, and establish the rate of de novo mutational events. GoNL will also serve as a reference panel for imputation in the available genome-wide association studies in Dutch and other cohorts to refine association signals and uncover population-specific variants. GoNL will create a catalog of human genetic variation in this sample that is uniquely characterized with respect to micro-geographic location and a wide range of phenotypes. The resource will be made available to the research and medical community to guide the interpretation of sequencing projects. The present paper summarizes the global characteristics of the project. PMID:23714750

  16. Biomass power for rural development. Quarterly report, July 3--December 4, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, J.T.

    1998-03-01

    This paper describes progress in several projects related to biomass power. These include switchgrass conversion development; switchgrass gasification development; production activities including soil studies, carbon studies, switchgrass production economics, watershed impacts, and prairie lands bio-products; information and education; and geographical information system. Attachments describe switchgrass co-firing test; switchgrass production in Iowa; cooperative agreements with ISU; Rathbun Lake watershed project; newspaper articles and information publications; Secretary of Agriculture Glickman`s visit; integration of technical aspects of switchgrass production in Iowa; and evaluation of an integrated biomass gasification/fuel cell power plant.

  17. Advantages of using 3D design tools in the nuclear power plants projects

    International Nuclear Information System (INIS)

    Roldan, P.; Melendro, J.; Gomez, A.; Hermana, I.

    2011-01-01

    It there is anything that distinguished Iberdrola Ingeneria y Construccion, as part of the Iberdrola Group, it is its firm commitment to innovation and continuous improvement. This is the philosophy that led the company to its interest in three-dimensional design tools back when they were in an early stage of development : very little international implementation, lack of integration with other applications, absence of previous experiences to understand the best possible configuration for each case, etc. Nevertheless, the company was able to see the tremendous advantage of having a construction program in the early months of a project- a detailed program that could predict, and therefore avoid, the problems that, if not anticipated, would arise in the construction phase when they result in higher costs, longer timeframes and a multitude of complications. This is precisely what 3D design tools offer prediction and this has been proven in the latest combined cycle projects executed with these tools. A project executed without errors not only decreases cost and time overruns, but also necessarily increases the quality of the end result. Efficiency and quality: these are both basic goals of Iberdrola Ingenieria y Construccion. The knowledge of and skill in the use of these tools have grown at the same time that their development has reached increasingly higher levels. As a result, Iberdrola Ingenieria y Conctruccion now has extensive experience in the use of 3D design tools and is prepared for the future challenges posed by these tools, the capabilities of which have attained such heights that it is possible to take on one of the most technically challenging projects that exists a nuclear power plant. And we are ready. (Author)

  18. The iSAT Project Mechanical properties and designs

    KAUST Repository

    Llewellyn, Gareth

    2011-08-08

    The whale shark Rhincodon typus is the largest fish in the world. The global population of R.typus is unknown however the International Union for Conservation of Nature (IUNC) classified it as Vulnerable in 2005. To ensure a population of R.typus is maintained protection from direct fishing, by-catch and collision damage is required. To be able to enact successful protection the habitat and range of R.typus must be known. Many authors have conducted studies of R.typus in a variety of different locations and many more have reported sightings. In many locations R.typus consistently appear annually and many authors have hypothesised reasons for their appearance. What is not known however is whether these populations are isolated or inter-linked, and where these populations go when they are not at known sites. The aim of this thesis was to design the body of a vessel that could house the electronics and components designed to track an acoustic tag, survive in open ocean, and travel fast enough to keep up with R.typus allowing a long-term and high resolution track to be compiled. In order to design such a vessel many factors needed to be known. A large part of this thesis is a review of literature to conclude the most appropriate type of vessel, the average speed of R.typus, hence the required speed of the vessel, and the sea state of the Red Sea, hence the conditions the vessel would be required to survive in. It was concluded that the average speed of R.typus is 1.2 knots; the Red Sea reaches Sea State 5-6; and the most appropriate hull type for this project was a Small Waterplane Area Twin Hull (SWATH). After following a design iteration process, a final design was completed that it is believed will achieve all the required objectives.

  19. Design, development and deployment of a hand/wrist exoskeleton for home-based rehabilitation after stroke - SCRIPT project

    OpenAIRE

    Amirabdollahian, F; Ates, Sedar; Basteris, A.; Cesario, A.; Buurke, Jaap; Hermens, Hermanus J.; Hofs, D.; Johansson, E.; Mountain, G.; Nasr, N.; Nijenhuis, S.M.; Prange, Grada Berendina; Rahman, N.; Sale, P.; Schätzlein, F.

    2014-01-01

    Objective: this manuscript introduces the Supervised Care and Rehabilitation Involving Personal Tele-robotics (SCRIPT) project. The main goal is to demonstrate design and development steps involved in a complex intervention, while examining feasibility of using an instrumented orthotic device for home-based rehabilitation after stroke. Methods: the project uses a user-centred design methodology to develop a hand/wrist rehabilitation device for home-based therapy after stroke. The patient bene...

  20. GIS Project Design: Brainstorming & Ideation Workshop

    OpenAIRE

    Garofalo, Frank

    2015-01-01

    Who should attend: Do you have a new project or existing project, and looking to generate some new ideas? Come with a project in mind or just come to learn some new collaboration and brainstorming techniques. What participants will learn… techniques for: Working with others to create a common direction and vision, then generating alignment Evaluating current state situations, strengths, complications and implications Identifying and forming consensus on key target audiences Generating ide...

  1. Using Design as Boundary Spanner Object in Climate Change Mitigation Projects

    Directory of Open Access Journals (Sweden)

    Walter Fernandez

    2010-01-01

    Full Text Available Climate change is a growing concern for society and the focus of numerous research initiatives across multiple fields of science. These initiatives often need to capitalize on the cross-specialized knowledge contributed by researchers from very different fields. The diversity of worldviews among key stakeholders requires an effective overall design strategy acting as a boundary spanner object. This study presents an account of the issues faced by a multidisciplinary research project and discusses the suitability of a design approach to help address issues such as equality, empowerment, autonomy, creativity, performance, reduction of innovation cycle times and also provide for the necessary balance between control, speediness and flexibility.

  2. Rapid product development: project engineering joined to design engineering in a concurrent engineering context

    Science.gov (United States)

    Bernard, Alain; Ouazzani, A.; Chambolle, F.; Bocquet, Jean Claud

    1997-01-01

    Software tools for designers are mainly based on geometry. Today, many industrial modelers have been rebuilt with C++, or any other object oriented language. This paper proposes to locate the research topics, in order to develop a functional link between project management tools, technical data management and product models. The 'design process' aspect will also be justified through the need of capitalizing designer intent and design history. This is related to different research works of Mechanical Engineering and Logistics Laboratory of Ecole Centrale Paris, and especially two PhD topics.

  3. Superconducting link bus design for the accelerator project for upgrade of LHC

    International Nuclear Information System (INIS)

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.

    2011-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  4. Coaxial-gun design and testing for the PLX- α Project

    Science.gov (United States)

    Witherspoon, F. Douglas; Brockington, Samuel; Case, Andrew; Cruz, Edward; Luna, Marco; Langendorf, Samuel

    2016-10-01

    We describe the Alpha coaxial gun designed for a 60-gun scaling study of spherically imploding plasma liners as a standoff driver for plasma-jet-driven magneto-inertial fusion (PJMIF). The guns operate over a range of parameters: 0.5-5.0 mg of Ar, Ne, N2, Kr, and Xe; 20-60 km/s; 2 × 1016 cm-3 muzzle density; and up to 7.5 kJ stored energy per gun. Each coaxial gun incorporates a fast dense gas injection and triggering system, a compact low-weight pfn with integral sparkgap switching, and a contoured gap designed to suppress the blow-by instability. The latest design iteration incorporates a faster more robust gas valve, an improved electrode contour, a custom 600- μF, 5-kV pfn, and six inline sparkgap switches operated in parallel. The switch and pfn are mounted directly to the back of the gun and are designed to reduce inductance, cost, and complexity, maximize efficiency and system reliability, and ensure symmetric current flow. We provide a brief overview of the design choices, the projected performance over the parameter ranges mentioned above, and experimental results from testing of the PLX- α coaxial gun. This work supported by the ARPA-E ALPHA Program.

  5. Tall-Building Projects Sustainability Indicator (TPSI: A New Design and Environmental Assessment Tool for Tall Buildings

    Directory of Open Access Journals (Sweden)

    Hasim Altan

    2012-04-01

    Full Text Available The paper presents the features of Tall-building Projects Sustainability Indicator (TPSI—a “Sustainability Rating System” that specializes in tall-building projects. The system comprises two components; the “Technical Manual” in the form of a booklet and the “Calculator” in the form of an Excel tool. It can be used as a “design tool” and/or as a “checklist” to compare and to improve the sustainable performance of tall-building design schemes. At the same time, the system can be used to evaluate the sustainability of existing tall-building projects. The first version of the TPSI rating system (TPSI 2012 Version was released as an online tool (GreenLight and thoroughly examined and validated by multiple parties.

  6. Visuals Matter! Designing and using effective visual representations to support project and portfolio decisions

    DEFF Research Database (Denmark)

    Geraldi, Joana; Arlt, Mario

    . They can help managers to be sharper and quicker, especially if visuals are used in a mindful manner. The intent of this book is to increase the awareness of project, program and portfolio practitioners and scholars about the importance of visuals and to provide practical recommendations on how they can......This book is the result of a two-year research project, funded by Project Management Institute and University College London on data visualization in the project and portfolio management contexts. Visuals are powerful and constitute an integral part of analyzing problems and making decisions...... be used and designed mindfully. The research, which underpins this book, focuses on the impact of visuals on cognition of data in project portfolio decisions. The complexity of portfolio problems often exceed human cognitive limitations as a result of a number of factors, such as the large number...

  7. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    International Nuclear Information System (INIS)

    CLEVELAND, K.J.

    2000-01-01

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage

  8. Design of CR superconducting dipole magnet in German FAIR project

    International Nuclear Information System (INIS)

    Zhu Yinfeng; Wu Weiyue; Wu Songtao; Xu Houchang; Liu Changle

    2008-01-01

    The engineering design of CR (collector ring) superconducting magnet of German FAIR (facility for antiproton and ion research) project is introduced. 3-D model is formed by CATIA, and the magnetic filed of 1/4 magnet is analyzed with ANSYS. Then the displacement and stress of the coil case, liquid helium (LHe) case, especially, the maximal displacement and stress when quenching happens are calculated based on the analysis of magnetic field. These results are necessary for manufacturing the formal magnet. (authors)

  9. A Project-Based Laboratory for Learning Embedded System Design with Industry Support

    Science.gov (United States)

    Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong

    2010-01-01

    A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…

  10. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  11. Medicinal Chemistry Projects Requiring Imaginative Structure-Based Drug Design Methods.

    Science.gov (United States)

    Moitessier, Nicolas; Pottel, Joshua; Therrien, Eric; Englebienne, Pablo; Liu, Zhaomin; Tomberg, Anna; Corbeil, Christopher R

    2016-09-20

    Computational methods for docking small molecules to proteins are prominent in drug discovery. There are hundreds, if not thousands, of documented examples-and several pertinent cases within our research program. Fifteen years ago, our first docking-guided drug design project yielded nanomolar metalloproteinase inhibitors and illustrated the potential of structure-based drug design. Subsequent applications of docking programs to the design of integrin antagonists, BACE-1 inhibitors, and aminoglycosides binding to bacterial RNA demonstrated that available docking programs needed significant improvement. At that time, docking programs primarily considered flexible ligands and rigid proteins. We demonstrated that accounting for protein flexibility, employing displaceable water molecules, and using ligand-based pharmacophores improved the docking accuracy of existing methods-enabling the design of bioactive molecules. The success prompted the development of our own program, Fitted, implementing all of these aspects. The primary motivation has always been to respond to the needs of drug design studies; the majority of the concepts behind the evolution of Fitted are rooted in medicinal chemistry projects and collaborations. Several examples follow: (1) Searching for HDAC inhibitors led us to develop methods considering drug-zinc coordination and its effect on the pKa of surrounding residues. (2) Targeting covalent prolyl oligopeptidase (POP) inhibitors prompted an update to Fitted to identify reactive groups and form bonds with a given residue (e.g., a catalytic residue) when the geometry allows it. Fitted-the first fully automated covalent docking program-was successfully applied to the discovery of four new classes of covalent POP inhibitors. As a result, efficient stereoselective syntheses of a few screening hits were prioritized rather than synthesizing large chemical libraries-yielding nanomolar inhibitors. (3) In order to study the metabolism of POP inhibitors by

  12. It takes two to tango : Investigating the antecedents and consequences of effective collaboration between designers and managers in innovation projects

    NARCIS (Netherlands)

    Tabeau, K.E.

    2016-01-01

    Designers are increasingly playing a strategic role in innovation projects. They can do this, amongst others, by more effectively collaborating with the managers of these projects. This thesis investigates the antecedents and consequences of effective collaboration between designers and managers in

  13. Design considerations of the World Bank-assisted $55 million photovoltaic market development project in India

    International Nuclear Information System (INIS)

    Cabraal, A.; Bradley, J.

    1993-01-01

    The World Bank's first loan for photovoltaic (PV) power systems was approved on December 17, 1992. The $55-million project will offer concessional financing through the Indian Renewable Energy Development Agency (IREDA) for the purchase of PV systems. The objective of the PV Market Development Project is to encourage the establishment of sustainable product supply, delivery, after-sales service, and financing mechanisms to support marketing PV products on a commercial basis. This paper outlines the issues and steps involved in the project design including: (1) technical viability, (2) financial and economic viability, (3) infrastructure issues, and (4) the economic and financial viability of the project as a whole

  14. MODEL PEMBELAJARAN PENDIDIKAN KEWARGANEGARAAN BERBASIS ISU-ISU KONTROVERSIAL DI MEDIA MASSA UNTUK MENINGKATKAN SIKAP DEMOKRASI MAHASISWA DAN IMPLIKASINYA BAGI MASYARAKAT MADANI

    Directory of Open Access Journals (Sweden)

    Ahmad Muhibbin

    2016-08-01

      The study aims to describe 1 civics education learning in Higher Education in relation to democracy attitude and its implication to civilized community, 2 a model design of tentative civics education (PKn learning, 3 a learning model of PKn as its reference, and 4 a model draft of PKn learning. This research used a qualitative approach with case study pattern. The data gathering technique employed an in-depth interview, observation, and documentation. The data validation applied a triangulation technique, member checking and collegial/peer   discussion. The data analysis used an interactive model. The results of the study show that 1 the PKn learning has not been working on the students’ democracy attitude development and its implication for a religious and civilized community so that it needs a paradigmatic dynamics of the learning in Higher Education. 2 the tentative model design include (a the lecturers presented the controversial issues with the video/slide, (b they explained the students about various problems, (c they evaluated what the students has understood and has not understood  about them, (d they developed an alternative solution with small groups, (e each group presented the results of discussion, (f they developed the materials that would be learnt more deeply and facilitated based on the concepts stated by each group; (g they concluded  and closed the learning activity. 3 The model of controversial issues-based PKn learning was modified with active learning. 4 The model draft intended to the students’ democracy attitude development and its implication to civilized community covers (a a-perception, (b the groups’ presentation by discussing the controversial issues, (c class discussion with active learning modification, (d confirmation, and (e closing.

  15. Integrating ergonomics knowledge into business-driven design projects: The shaping of resource constraints in engineering consultancy.

    Science.gov (United States)

    Hall-Andersen, Lene Bjerg; Neumann, Patrick; Broberg, Ole

    2016-10-17

    The integration of ergonomics knowledge into engineering projects leads to both healthier and more efficient workplaces. There is a lack of knowledge about integrating ergonomic knowledge into the design practice in engineering consultancies. This study explores how organizational resources can pose constraints for the integration of ergonomics knowledge into engineering design projects in a business-driven setting, and how ergonomists cope with these resource constraints. An exploratory case study in an engineering consultancy was conducted. A total of 27 participants were interviewed. Data were collected applying semi-structured interviews, observations, and documentary studies. Interviews were transcribed, coded, and categorized into themes. From the analysis five overall themes emerged as major constituents of resource constraints: 1) maximizing project revenue, 2) payment for ergonomics services, 3) value of ergonomic services, 4) role of the client, and 5) coping strategies to overcome resource constraints. We hypothesize that resource constraints were shaped due to sub-optimization of costs in design projects. The economical contribution of ergonomics measures was not evaluated in the entire life cycle of a designed workplace. Coping strategies included teaming up with engineering designers in the sales process or creating an alliance with ergonomists in the client organization.

  16. Project of computer program for designing the steel with the assumed CCT diagram

    OpenAIRE

    S. Malara; J. Trzaska; L.A. Dobrzański

    2007-01-01

    Purpose: The aim of this paper was developing a project of computer aided method for designing the chemicalcomposition of steel with the assumed CCT diagram.Design/methodology/approach: The purpose has been achieved in four stages. At the first stage characteristicpoints of CCT diagram have been determined. At the second stage neural networks have been developed, andnext CCT diagram terms of similarity have been worked out- at the third one. In the last one steel chemicalcomposition optimizat...

  17. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  18. Allowing for MSD prevention during facilities planning for a public service: an a posteriori analysis of 10 library design projects.

    Science.gov (United States)

    Bellemare, Marie; Trudel, Louis; Ledoux, Elise; Montreuil, Sylvie; Marier, Micheline; Laberge, Marie; Vincent, Patrick

    2006-01-01

    Research was conducted to identify an ergonomics-based intervention model designed to factor in musculoskeletal disorder (MSD) prevention when library projects are being designed. The first stage of the research involved an a posteriori analysis of 10 recent redesign projects. The purpose of the analysis was to document perceptions about the attention given to MSD prevention measures over the course of a project on the part of 2 categories of employees: librarians responsible for such projects and personnel working in the libraries before and after changes. Subjects were interviewed in focus groups. Outcomes of the analysis can guide our ergonomic assessment of current situations and contribute to a better understanding of the way inclusion or improvement of prevention measures can support the workplace design process.

  19. Empowering Persons with Deafblindness: Designing an Intelligent Assistive Wearable in the SUITCEYES Project

    NARCIS (Netherlands)

    Korn, Oliver; Holt, Raymond; Kontopoulos, Efstratios; Kappers, Astrid M.L.; Persson, Nils-Krister; Olson, Nasrine

    2018-01-01

    Deafblindness is a condition that limits communication capabilities primarily to the haptic channel. In the EU-funded project SUITCEYES we design a system which allows haptic and thermal communication via soft interfaces and textiles. Based on user needs and informed by disability studies, we

  20. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  1. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, Philip [Building Science Corporation, Somerville, MA (United States)

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  2. Sustainable Smart Grid Project Design

    International Nuclear Information System (INIS)

    Szabo, I.

    2014-01-01

    Living together with the SG project generation issues in the last years a significant conclusion revealed from the unknown universe. Technology is not the missing condition for a real-time working country-wide SG power system realization. Technologies are developed, and 'SG-ready'. Engineering society is waiting for the signal to jump till the Moon or even farther. There are technical discussions about SG technologies. All there are marginal (ie. network safety issues, metering issues, electromobility etc.) and projects are mostly targeting the industrial players which obviously want to sell their utmost technologies taking generally not into consideration the overall social interests. The most anticipated question is: Who owns the social responsibility of the future (and as a part of it) its contemporary electric power utility system's responsibility? What should happen in order to start real development of 21st century's power system? How to open eyes of decision makers and energy institutions? Are these auxiliary SG projects natural evolution of the final solutions and systems? (author).

  3. Key Success Factors and Guidance for International Collaborative Design Projects

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2015-11-01

    Full Text Available In the built environment (BE sector, the co-creation process of design demands understanding of requirements (as viewed by parties involved, mobilisation of tacit knowledge, negotiation, and complex exchange of information. The need to collaborate over distance has further exacerbated the complexity of the process, and, in itself, represents a significant challenge for BE professionals who are increasingly expected to undertake this process within globally distributed virtual teams. The research aims to identify key success factors and develop guidance for international collaborative design projects, via the implementation of collaborative design courses in UK and Canadian universities over three academic years. Questionnaire surveys, focus groups, observation of online meetings, personal reflections provided data for the analysis. The findings reveal the significance of the perceived risk of collaboration and a difference in preferred communication mode between architects and civil/structural engineers. These findings suggest the impact of training in the subject discipline, and that the opportunity for co-located working has helped the development of trust. The guidance is aimed at BE educators who wish to implement this activity in their courses.

  4. Zinc and the iron donor frataxin regulate oligomerization of the scaffold protein to form new Fe-S cluster assembly centers.

    Science.gov (United States)

    Galeano, B K; Ranatunga, W; Gakh, O; Smith, D Y; Thompson, J R; Isaya, G

    2017-06-21

    Early studies of the bacterial Fe-S cluster assembly system provided structural details for how the scaffold protein and the cysteine desulfurase interact. This work and additional work on the yeast and human systems elucidated a conserved mechanism for sulfur donation but did not provide any conclusive insights into the mechanism for iron delivery from the iron donor, frataxin, to the scaffold. We previously showed that oligomerization is a mechanism by which yeast frataxin (Yfh1) can promote assembly of the core machinery for Fe-S cluster synthesis both in vitro and in cells, in such a manner that the scaffold protein, Isu1, can bind to Yfh1 independent of the presence of the cysteine desulfurase, Nfs1. Here, in the absence of Yfh1, Isu1 was found to exist in two forms, one mostly monomeric with limited tendency to dimerize, and one with a strong propensity to oligomerize. Whereas the monomeric form is stabilized by zinc, the loss of zinc promotes formation of dimer and higher order oligomers. However, upon binding to oligomeric Yfh1, both forms take on a similar symmetrical trimeric configuration that places the Fe-S cluster coordinating residues of Isu1 in close proximity of iron-binding residues of Yfh1. This configuration is suitable for docking of Nfs1 in a manner that provides a structural context for coordinate iron and sulfur donation to the scaffold. Moreover, distinct structural features suggest that in physiological conditions the zinc-regulated abundance of monomeric vs. oligomeric Isu1 yields [Yfh1]·[Isu1] complexes with different Isu1 configurations that afford unique functional properties for Fe-S cluster assembly and delivery.

  5. The characteristics and interpretability of land surface change and implications for project design

    Science.gov (United States)

    Sohl, Terry L.; Gallant, Alisa L.; Loveland, Thomas R.

    2004-01-01

    The need for comprehensive, accurate information on land-cover change has never been greater. While remotely sensed imagery affords the opportunity to provide information on land-cover change over large geographic expanses at a relatively low cost, the characteristics of land-surface change bring into question the suitability of many commonly used methodologies. Algorithm-based methodologies to detect change generally cannot provide the same level of accuracy as the analyses done by human interpreters. Results from the Land Cover Trends project, a cooperative venture that includes the U.S. Geological Survey, Environmental Protection Agency, and National Aeronautics and Space Administration, have shown that land-cover conversion is a relatively rare event, occurs locally in small patches, varies geographically and temporally, and is spectrally ambiguous. Based on these characteristics of change and the type of information required, manual interpretation was selected as the primary means of detecting change in the Land Cover Trends project. Mixtures of algorithm-based detection and manual interpretation may often prove to be the most feasible and appropriate design for change-detection applications. Serious examination of the expected characteristics and measurability of change must be considered during the design and implementation phase of any change analysis project.

  6. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students†

    OpenAIRE

    Beach, Dale L.; Alvarez, Consuelo J.

    2015-01-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniq...

  7. A Web-Based System for Monitoring and Controlling Multidisciplinary Design Projects

    Science.gov (United States)

    Salas, Andrea O.; Rogers, James L.

    1997-01-01

    In today's competitive environment, both industry and government agencies are under enormous pressure to reduce the time and cost of multidisciplinary design projects. A number of frameworks have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. An examination of current frameworks reveals weaknesses in various areas such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, in conjunction with an existing framework, can improve these areas of weakness. This paper describes a system that executes a sequence of programs, monitors and controls the design process through a Web-based interface, and visualizes intermediate and final results through the use of Java(Tm) applets. A small sample problem, which includes nine processes with two analysis programs that are coupled to an optimizer, is used to demonstrate the feasibility of this approach.

  8. Design and Flood Control Assessment of 5MWp Fishing and Photovoltaic Power Project in Xinghua City

    Science.gov (United States)

    Guo, Liuchao; Hu, Xiaodong; Su, Yuyan; Wu, Peipei; Weng, Songgan

    2017-12-01

    In order to reduce coal consumption in Jiangsu Province and develop new energy sources, considering on the distribution of geology, solar energy resources, traffic and grid connection in Xinghua City, the aim is to determine the configuration of photovoltaic modules and photovoltaic array tracking mode, design photovoltaic array and layout scheme. But the project is a wading project, it is built in Dong Tan Lake polder I115, it needs scientific and reasonable evaluation to the effect of Dong Tan Lake’s flood storage and discharge. The results can provide guidance for similar engineering’s design.

  9. Design-Build-Finance in the US: The case of iROX, I-75 Road Expansion Project

    OpenAIRE

    Forcael,E; Ellis, JR,R; Jaramillo,F

    2011-01-01

    This project is part of the Interstate 75 road expansion, located in Southwest Florida and consisted of an expansion from four to six lanes along a 30-mile stretch. The paper presents a design, build and finance (DBF) approach applied to a US highway. This work focuses on the financial structure of the project, which did not include a concession (operation); the bidding procedure, which took into account an interesting bid evaluation criterion and; project management matters. The information ...

  10. Engineering design and economic evaluation of a family-sized biogas project in Nigeria

    International Nuclear Information System (INIS)

    Adeoti, O.; Ilori, M.O.; Oyebisi, T.O.; Adekoya, L.O.

    2000-01-01

    To woo householders into harnessing the cooking energy potential of biogas in order to solve the perennial cooking energy problems at household level in Nigeria, this paper carried out the engineering design requirement, and used the discounted cash flow micro-economic assessments to evaluate the 6.0 m 3 family-sized biogas project in Nigeria. The project has an initial investment cost of 41,088 Naira, annual expenditure of 5909 Naira and an annual benefit of 13,347 Naira. The NPV, IRR, B/C and payback period of financial analysis are 0.050 million Naira, 17.52%, 2.26 and 6.6 years respectively. This shows that the 6.0 m 3 family-sized biogas project using cattle dung as substrate in Nigeria has a good economic potential. (author)

  11. Effect of compost age and composition on the atrazine removal from solution

    Science.gov (United States)

    Tsui, L.; Roy, W.R.

    2007-01-01

    Compost samples from two composting facilities, the Urbana (Illinois) Landscape Recycling Center (ULRC) and Illinois State University (ISU), were selected to examine the effect of compost age on atrazine removal from solution. The ULRC samples were made from yard waste without an additional nitrogen source. The ISU samples were made from yard waste or sawdust with the addition of manure. The 6-month-old ULRC compost had the greater capacity to remove atrazine from solution, which we attributed to its greater organic carbon content. The addition of nitrate into ULRC compost could influence the extent of atrazine removal, but did not have a significant impact on atrazine removal when applied to ISU compost, probably because manure was added to the yard waste to produce the compost. For both ULRC and ISU samples, the presence of sodium azide inhibited atrazine removal, suggesting that microbial activity contributed to the atrazine removal. Metabolic analysis demonstrated that hydroxyatrazine was the major identified metabolite that accumulated in solution before significant ring mineralization could occur. When compared with the ISU compost, the ULRC compost sample had a greater capacity to remove atrazine from solution during the 120 days of study because of the larger humic acid content. The experimental results suggested that less-mature compost may be better suited for environmental applications such as removing atrazine from tile-drainage waters. ?? 2006 Elsevier B.V. All rights reserved.

  12. Effect of compost age and composition on the atrazine removal from solution.

    Science.gov (United States)

    Tsui, Lo; Roy, William R

    2007-01-02

    Compost samples from two composting facilities, the Urbana (Illinois) Landscape Recycling Center (ULRC) and Illinois State University (ISU), were selected to examine the effect of compost age on atrazine removal from solution. The ULRC samples were made from yard waste without an additional nitrogen source. The ISU samples were made from yard waste or sawdust with the addition of manure. The 6-month-old ULRC compost had the greater capacity to remove atrazine from solution, which we attributed to its greater organic carbon content. The addition of nitrate into ULRC compost could influence the extent of atrazine removal, but did not have a significant impact on atrazine removal when applied to ISU compost, probably because manure was added to the yard waste to produce the compost. For both ULRC and ISU samples, the presence of sodium azide inhibited atrazine removal, suggesting that microbial activity contributed to the atrazine removal. Metabolic analysis demonstrated that hydroxyatrazine was the major identified metabolite that accumulated in solution before significant ring mineralization could occur. When compared with the ISU compost, the ULRC compost sample had a greater capacity to remove atrazine from solution during the 120 days of study because of the larger humic acid content. The experimental results suggested that less-mature compost may be better suited for environmental applications such as removing atrazine from tile-drainage waters.

  13. Using Wikis to Investigate Communication, Collaboration and Engagement in Capstone Engineering Design Projects

    Science.gov (United States)

    Berthoud, L.; Gliddon, J.

    2018-01-01

    In today's global Aerospace industry, virtual workspaces are commonly used for collaboration between geographically distributed multidisciplinary teams. This study investigated the use of wikis to look at communication, collaboration and engagement in 'Capstone' team design projects at the end of an engineering degree. Wikis were set up for teams…

  14. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  15. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  16. A Summary of the NASA Design Environment for Novel Vertical Lift Vehicles (DELIVER) Project

    Science.gov (United States)

    Theodore, Colin R.

    2018-01-01

    The number of new markets and use cases being developed for vertical take-off and landing vehicles continues to explode, including the highly publicized urban air taxi and package deliver applications. There is an equally exploding variety of novel vehicle configurations and sizes that are being proposed to fill these new market applications. The challenge for vehicle designers is that there is currently no easy and consistent way to go from a compelling mission or use case to a vehicle that is best configured and sized for the particular mission. This is because the availability of accurate and validated conceptual design tools for these novel types and sizes of vehicles have not kept pace with the new markets and vehicles themselves. The Design Environment for Novel Vertical Lift Vehicles (DELIVER) project was formulated to address this vehicle design challenge by demonstrating the use of current conceptual design tools, that have been used for decades to design and size conventional rotorcraft, applied to these novel vehicle types, configurations and sizes. In addition to demonstrating the applicability of current design and sizing tools to novel vehicle configurations and sizes, DELIVER also demonstrated the addition of key transformational technologies of noise, autonomy, and hybrid-electric and all-electric propulsion into the vehicle conceptual design process. Noise is key for community acceptance, autonomy and the need to operate autonomously are key for efficient, reliable and safe operations, and electrification of the propulsion system is a key enabler for these new vehicle types and sizes. This paper provides a summary of the DELIVER project and shows the applicability of current conceptual design and sizing tools novel vehicle configurations and sizes that are being proposed for urban air taxi and package delivery type applications.

  17. Safeguards and security by design support for the next generation nuclear plant project - Progress in safeguards by design (SBD) by the United States National Nuclear Security Administration (NNSA)

    International Nuclear Information System (INIS)

    Bjornard, T.; Casey Durst, P.

    2013-01-01

    The Next Generation Nuclear Plant (NGNP) project was authorized by the United States Energy Policy Act of 2005 with the principal objective of designing, licensing, and building a Generation IV nuclear plant capable of producing both high-temperature process heat and electricity. The two candidate NGNP reactor concepts are pebble- and prismatic-fueled high-temperature gas reactors that will be licensed by the U.S. Nuclear Regulatory Commission (NRC). The conceptual design phase of the project was completed in December 2010. This paper summarizes support provided to the NGNP project to facilitate consideration of international safeguards during the design phase, or safeguards by design (SBD). Additional support was provided for domestic safeguards (material control and accounting) and physical protection, or safeguards and security by design (2SBD). The main focus of this paper is on SBD and international safeguards. Included is an overview of the international safeguards guidance contained in guidance reports for SBD. These reports contain guidance and suggestions intended to be useful to the industry design teams, but they do not contain ready-made solutions. Early and frequent interaction of design stakeholders with the International Atomic Energy Agency and the NRC are essential to a successful endeavor. The paper is followed by the slides of the presentation. (author)

  18. Practicing Learner-Centered Teaching: Pedagogical Design and Assessment of a Second Life Project

    Science.gov (United States)

    Schiller, Shu Z.

    2009-01-01

    Guided by the principles of learner-centered teaching methodology, a Second Life project is designed to engage students in active learning of virtual commerce through hands-on experiences and teamwork in a virtual environment. More importantly, an assessment framework is proposed to evaluate the learning objectives and learning process of the…

  19. Natural Water Retention Measures (NWRM): from Design to Implementation through European Projects

    International Nuclear Information System (INIS)

    Magdaleno Mas, F.; Dalacamara Andres, G.

    2015-01-01

    The Centre for Applied Technique Studies (CETA) of CEDEX has been working over the last few years in different European projects related with the design and development of natural water retention measures (NWRM). These are a number of measures, boosted by the Water Unit of the Environment Directorate-General of the European Commission. with close links to green infrastructures, which try to integrate, from a multifunctional approach, different legal and technical requirements aimed at a better adaptation to extreme hydro meteorological events, environmental protection and conservation, and maintenance of ecosystem services. This paper reviews the underpinning foundations of the concept and the mechanisms for designing and implementing NWRM. It also shows the way they can be applied, by presenting different initiatives developed by CETA since 2008 in Navarra (Arga-Aragon rivers system). For fulfilling those works, CETA has collaborated with environmental and hydraulic authorities of Navarra. It has also actively cooperated with research centres, such as the Institute IMDEA Water. specifically in a European project devoted to the diffusion, assessment, and presentation of NWRM within the context of the EU River Basin Districts. (Author)

  20. Design and fabrication of the prototype superconducting quadrupole for the CERN LHC project

    International Nuclear Information System (INIS)

    Baze, J.M.; Cacaut, D.; Jacquemin, J.P.; Lyraud, C.; Michez, C.; Pabot, Y.; Perot, J.; Rifflet, J.M.; Toussaint, J.C.; Vedrine, P.

    1992-01-01

    Within the framework of the LHC R and D program, CERN and CEA/Saclay have established a collaboration to carry out, amongst others, the design, building and testing of a superconducting LHC prototype quadrupole at the Saclay laboratory. The cold mass of this quadrupole is presently under construction at Saclay. The quadrupole design features a twin aperture configuration, a gradient design features a twin aperture configuration, a gradient of 250T/m, a length of 3m and a free coil aperture of 56mm. European industries participate in this project by delivering components and fabrication the tooling according to specifications prepared by Saclay. This paper gives details of the magnet design and construction. Coil winding will start in summer 1991 and the first prototype should be assembled and ready for testing by mid 1992

  1. Preliminary design report: Prototypical Spent Fuel Consolidation Equipment Demonstration Project: Phase 1

    International Nuclear Information System (INIS)

    Blissell, W.H.; Ciez, A.P.; Mitchell, J.L.; Winkler, C.J.

    1986-12-01

    This document describes the Westinghouse Preliminary Design for the Prototypical Consolidation Demonstration Project per Department of Energy (DOE) Contract No. DE-AC07-86ID12649 and under direction of the DOE Idaho Operations Office. The preliminary design is the first step to providing the Department of Energy with a fully qualified, licensable, cost-effective spent fuel rod consolidation system. The design was developed using proven technologies and equipment to create an innovative approach to previous rod consolidation concepts. These innovations will better enable the Westinghouse system to: consolidate fuel rods in a precise, fully-controlled, accountable manner; package all rods from two PWR fuel assemblies or from four BWR fuel assemblies in one 8.5 inch square consolidated rods canister; meet all functional requirements; operate with all fuel types common to the US commercial nuclear industry with minimal tooling changeouts; and meet consolidation production process rates, while maintaining operator and public health and safety. This Preliminary Design Report provides both detailed descriptions of the equipment required to perform the rod consolidation process and the supporting analyses to validate the design

  2. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  3. Students’ Perceptions of Humour and Creativity in Project-Organized Groups (POG) in Engineering Design Education in China

    DEFF Research Database (Denmark)

    Zhou, Chunfang

    2015-01-01

    This study explores engineering design students’ perceptions of humor in the experiences of creativity development in Project-Organized Groups (POGs). This study links theories including humor, learning, creativity, and engineering design in one framework. Empirically, this study carried out...

  4. Preliminary design requirements document (DRD) for Project W-236B, ''Initial Pretreatment Module''

    International Nuclear Information System (INIS)

    Swanson, L.M.

    1995-01-01

    The scope of this Design Requirements Document (DRD) is to identify and define the functions, with associated requirements, which must be performed to separate Hanford Site tank waste supernatants into low-level and high-level fractions. This documents sets forth function requirements, performance requirements, and design constraints necessary to begin conceptual design for the Initial Pretreatment Module (IPM). System and physical interfaces between the IPM project and the Tank Waste Remediation System (TWRS) are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. Supplemental DRDs will be prepared to provide more detailed requirements specific to systems described in the DRD

  5. Design and Co-design of Project-organized Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Andreasen, Lars Birch

    2014-01-01

    The chapter contributes to discussions on design processes in relation to education, presenting different notions of design research and demonstrating how professors and students are involved together in designing innovative and constructive study processes that can help foster students' engagement...

  6. Design of an off-axis visual display based on a free-form projection screen to realize stereo vision

    Science.gov (United States)

    Zhao, Yuanming; Cui, Qingfeng; Piao, Mingxu; Zhao, Lidong

    2017-10-01

    A free-form projection screen is designed for an off-axis visual display, which shows great potential in applications such as flight training for providing both accommodation and convergence cues for pilots. The method based on point cloud is proposed for the design of the free-form surface, and the design of the point cloud is controlled by a program written in the macro-language. In the visual display based on the free-form projection screen, when the error of the screen along Z-axis is 1 mm, the error of visual distance at each filed is less than 1%. And the resolution of the design for full field is better than 1‧, which meet the requirement of resolution for human eyes.

  7. Performance projections and design optimization of planar double gate SOI MOSFETs for logic technology applications

    International Nuclear Information System (INIS)

    Kranti, Abhinav; Hao Ying; Armstrong, G Alastair

    2008-01-01

    In this paper, by investigating the influence of source/drain extension region engineering (also known as gate–source/drain underlap) in nanoscale planar double gate (DG) SOI MOSFETs, we offer new insights into the design of future nanoscale gate-underlap DG devices to achieve ITRS projections for high performance (HP), low standby power (LSTP) and low operating power (LOP) logic technologies. The impact of high-κ gate dielectric, silicon film thickness, together with parameters associated with the lateral source/drain doping profile, is investigated in detail. The results show that spacer width along with lateral straggle can not only effectively control short-channel effects, thus presenting low off-current in a gate underlap device, but can also be optimized to achieve lower intrinsic delay and higher on–off current ratio (I on /I off ). Based on the investigation of on-current (I on ), off-current (I off ), I on /I off , intrinsic delay (τ), energy delay product and static power dissipation, we present design guidelines to select key device parameters to achieve ITRS projections. Using nominal gate lengths for different technologies, as recommended from ITRS specification, optimally designed gate-underlap DG MOSFETs with a spacer-to-straggle (s/σ) ratio of 2.3 for HP/LOP and 3.2 for LSTP logic technologies will meet ITRS projection. However, a relatively narrow range of lateral straggle lying between 7 to 8 nm is recommended. A sensitivity analysis of intrinsic delay, on-current and off-current to important parameters allows a comparative analysis of the various design options and shows that gate workfunction appears to be the most crucial parameter in the design of DG devices for all three technologies. The impact of back gate misalignment on I on , I off and τ is also investigated for optimized underlap devices

  8. Designing for Change: Minimizing the Impact of Changing Requirements in the Later Stages of a Spaceflight Software Project

    Science.gov (United States)

    Allen, B. Danette

    1998-01-01

    In the traditional 'waterfall' model of the software project life cycle, the Requirements Phase ends and flows into the Design Phase, which ends and flows into the Development Phase. Unfortunately, the process rarely, if ever, works so smoothly in practice. Instead, software developers often receive new requirements, or modifications to the original requirements, well after the earlier project phases have been completed. In particular, projects with shorter than ideal schedules are highly susceptible to frequent requirements changes, as the software requirements analysis phase is often forced to begin before the overall system requirements and top-level design are complete. This results in later modifications to the software requirements, even though the software design and development phases may be complete. Requirements changes received in the later stages of a software project inevitably lead to modification of existing developed software. Presented here is a series of software design techniques that can greatly reduce the impact of last-minute requirements changes. These techniques were successfully used to add built-in flexibility to two complex software systems in which the requirements were expected to (and did) change frequently. These large, real-time systems were developed at NASA Langley Research Center (LaRC) to test and control the Lidar In-Space Technology Experiment (LITE) instrument which flew aboard the space shuttle Discovery as the primary payload on the STS-64 mission.

  9. Design methods and design theory for architectural design management

    NARCIS (Netherlands)

    Achten, H.H.; Otter, den A.F.H.J.; Achten, H.H.; Pels, H.J.

    2008-01-01

    Most parties that an architectural design manager meets in daily practice are engaged to some degree with design. What these parties are actually doing in a project is contingent with the concrete design project. Additionally, each party has some stake, and may employ different strategies to solve

  10. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  11. Introduction to the Biomass Project: An Illustration of Evidence-Centered Assessment Design and Delivery Capability. CSE Report.

    Science.gov (United States)

    Steinberg, Linda S.; Mislevy, Robert J.; Almond, Russell G.; Baird, Andrew B.; Cahallan, Cara; Dibello, Louis V.; Senturk, Deniz; Yan, Duanli; Chernick, Howard; Kindfield, Ann C. H.

    This paper describes the design rationale for a prototype of an innovative assessment product, and the process that led to the design. The goals of the Biomass project were to demonstrate: (1) an assessment product designed to serve two new purposes in the transition from high school to college; and (2) the capability needed to produce this kind…

  12. Designing Material Materialising Design

    DEFF Research Database (Denmark)

    Nicholas, Paul

    2013-01-01

    Designing Material Materialising Design documents five projects developed at the Centre for Information Technology and Architecture (CITA) at the Royal Danish Academy of Fine Arts, School of Architecture. These projects explore the idea that new designed materials might require new design methods....... Focusing on fibre reinforced composites, this book sustains an exploration into the design and making of elastically tailored architectural structures that rely on the use of computational design to predict sensitive interdependencies between geometry and behaviour. Developing novel concepts...

  13. Designing smart energy. Final report of the Tekes research project 2007-2008

    Energy Technology Data Exchange (ETDEWEB)

    Peltonen, S.; Pakkanen, M.; Pitkaejaervi, S.; Lautamaeki, S.; Oehman, C.; Baang, M.; Peltola, T.; Broms, L.; Gustafsson, M.-L.

    2009-07-01

    The Desme project aimed at analysing the possibilities of changing consumer behaviour in terms of energy efficiency by using industrial design as a tool. Concept and interaction design was used in order to study how consumers react to the concepts of smart energy applications that focus on showing and guiding consumer's energy usage. Several studies of people's attitudes and knowledge related to energy already exist. However, these studies measure people's intentions rather than their actions and actual buying decisions. In order to be effective, segmentation needs to be based not only on consumer attitudes towards energy saving but also on their actual energy behaviour as multiple studies have shown that the correlation between people's attitudes and behaviour is weak. It is important to understand how people use energy in their everyday lives, what kinds of energy saving actions they currently employ and what their general view on energy saving amounts to. Understanding consumers' energy behaviour is important in order to be able to create more specific energy saving solutions for different contexts of everyday life. Several product and service concepts were created during the design phase of the Desme project. When creating the concept ideas, the designers focused on two different but supporting aspects: the everyday life context and consumer lifestyles. The existing knowledge of energy consumer segments was also employed as a framework for the concept ideas. The main purpose was to design products that would relate to some major problem areas concerning energy saving in the home environment and still fit in with the user's lifestyle. The concept ideas were evaluated by companies, designers and a research group. Four concepts were selected for further development and consumer testing: Home display, Shower duck, Key hanger and Energy plant. The concept testing revealed that these four design concepts approached the energy saving

  14. Report of the design study on the proton linac of the Japanese Hadron Project, 2

    International Nuclear Information System (INIS)

    1990-06-01

    The design study on the proton linac of the Japanese Hadron Project began in May 1987, in the collaboration of Institute for Nuclear Study, University of Tokyo and National Laboratory for High Energy Physics. This is the second report of the design study on the 1-GeV proton linac, which includes the developments of the ion source, RFQ, DTL, CCL and RF sources. (author)

  15. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  16. Design, Results, Evolution and Status of the ATLAS Simulation at Point1 Project

    CERN Document Server

    AUTHOR|(SzGeCERN)377840; Fressard-Batraneanu, Silvia Maria; Ballestrero, Sergio; Contescu, Alexandru Cristian; Fazio, Daniel; Di Girolamo, Alessandro; Lee, Christopher Jon; Pozo Astigarraga, Mikel Eukeni; Scannicchio, Diana; Sedov, Alexey; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2015-01-01

    Abstract. During the LHC Long Shutdown 1 period (LS1), that started in 2013, the Simulation at Point1 (Sim@P1) Project takes advantage, in an opportunistic way, of the TDAQ (Trigger and Data Acquisition) HLT (High Level Trigger) farm of the ATLAS experiment. This farm provides more than 1300 compute nodes, which are particularly suited for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2700 virtual machines (VMs) provided with 8 CPU cores each, for a total of up to 22000 parallel running jobs. This contribution gives a review of the design, the results, and the evolution of the Sim@P1 Project; operating a large scale OpenStack based virtualized platform deployed on top of the ATLAS TDAQ HLT farm computing resources. During LS1, Sim@P1 was one of the most productive ATLAS sites: it delivered more than 50 million CPU-hours and it generated more than 1.7 billion Monte Carlo events to various analysis communities. The design aspects a...

  17. Design, Results, Evolution and Status of the ATLAS simulation in Point1 project.

    CERN Document Server

    Ballestrero, Sergio; The ATLAS collaboration; Brasolin, Franco; Contescu, Alexandru Cristian; Fazio, Daniel; Di Girolamo, Alessandro; Lee, Christopher Jon; Pozo Astigarraga, Mikel Eukeni; Scannicchio, Diana; Sedov, Alexey; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2015-01-01

    During the LHC long shutdown period (LS1), that started in 2013, the simulation in Point1 (Sim@P1) project takes advantage in an opportunistic way of the trigger and data acquisition (TDAQ) farm of the ATLAS experiment. The farm provides more than 1500 computer nodes, and they are particularly suitable for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2500 virtual machines (VM) provided with 8 CPU cores each, for a total of up to 20000 parallel running jobs. This contribution gives a thorough review of the design, the results and the evolution of the Sim@P1 project operating a large scale Openstack based virtualized platform deployed on top of the ATLAS TDAQ farm computing resources. During LS1, Sim@P1 was one of the most productive GRID sites: it delivered more than 50 million CPU-hours and it generated more than 1.7 billion Monte Carlo events to various analysis communities within the ATLAS collaboration. The particular design ...

  18. The Design of Project Management Structural Organization

    OpenAIRE

    Dumitru Constantinescu; Cristian Etegan

    2007-01-01

    The relationships organization-suppliers-customers have recently known major changes in the structure of services and have made the organization develop its managerial and professional competencies in order to do projects. The qualified organization is the most trust-worthy in the process of doing a project. The participation of an organization in doing projects depends on a multitude of factors. Out of these factors, the structural organization comes forth, as it represents the variable with...

  19. Basic research in support of innovative fuels design for the Generation IV systems (F-BRIDGE project)

    International Nuclear Information System (INIS)

    Valot, Carole; Bertolus, Marjorie; Konings, Rudy; Somers, Joe; Groot, Sander de

    2010-01-01

    F-BRIDGE (Basic Research in support of Innovative Fuels Design for the GEN IV systems) is a 4-year project which started in 2008. It seeks to bridge the gap between basic research and technological applications for generation IV nuclear reactor systems. One of the challenges for the next generation of reactors is to significantly increase the efficiency in designing innovative fuels. The object of the F-BRIDGE project is to complement the empirical approach by a physically-based description of fuel and cladding materials to enable a rationalization of the design process and a better selection of promising fuel systems. Advanced modelling and separate effects experiments are carried out in order to obtain more exact physical descriptions of ceramic fuels and cladding, at relevant scales from the atomic to the macroscopic scale. Research is also focused on assessing and improving 'sphere-pac' fuel, a composite-ceramics concept which has shown promise. The project activities can be broken down into four main areas: (i) Basic research investigations using a multi-scale approach in both experimentation and modelling to enable the generation of missing basic data, the identification of relevant mechanisms and the development of appropriate models; (ii) Transfer between technological issues and basic research by bringing together within the same project materials scientists, engineers and end-users; (iii) Assessment of the drawbacks and benefits of the sphere-pac fuel application to various Generation IV systems; (iv) Education and training to promote research in the field of fuel materials, to ensure the exchange of results and ideas among the participants and to link the project with other related European or international initiatives. The project relies on the complementary expertise of 19 partners: nuclear and non nuclear research organisations, universities, a nuclear engineering company, as well as technology and project management consultancy small and medium

  20. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  1. CHINA SPALLATION NEUTRON SOURCE PROJECT: DESIGN ITERATIONS AND R AND D STATUS

    International Nuclear Information System (INIS)

    WEI, J.

    2006-01-01

    The China Spallation Neutron Source (CSNS) is an accelerator based high power project currently under preparation in China. The accelerator complex is based on an H - linear accelerator and a rapid cycling proton synchrotron. During the past year, the design of most accelerator systems went through major iterations, and initial research and developments were started on the prototyping of several key components. This paper summarizes major activities of the past year

  2. EarthCube as an information resource marketplace; the GEAR Project conceptual design

    Science.gov (United States)

    Richard, S. M.; Zaslavsky, I.; Gupta, A.; Valentine, D.

    2015-12-01

    Geoscience Architecture for Research (GEAR) is approaching EarthCube design as a complex and evolving socio-technical federation of systems. EarthCube is intended to support the science research enterprise, for which there is no centralized command and control, requirements are a moving target, the function and behavior of the system must evolve and adapt as new scientific paradigms emerge, and system participants are conducting research that inherently implies seeking new ways of doing things. EarthCube must address evolving user requirements and enable domain and project systems developed under different management and for different purposes to work together. The EC architecture must focus on creating a technical environment that enables new capabilities by combining existing and newly developed resources in various ways, and encourages development of new resource designs intended for re-use and interoperability. In a sense, instead of a single architecture design, GEAR provides a way to accommodate multiple designs tuned to different tasks. This agile, adaptive, evolutionary software development style is based on a continuously updated portfolio of compatible components that enable new sub-system architecture. System users make decisions about which components to use in this marketplace based on performance, satisfaction, and impact metrics collected continuously to evaluate components, determine priorities, and guide resource allocation decisions by the system governance agency. EC is designed as a federation of independent systems, and although the coordinator of the EC system may be named an enterprise architect, the focus of the role needs to be organizing resources, assessing their readiness for interoperability with the existing EC component inventory, managing dependencies between transient subsystems, mechanisms of stakeholder engagement and inclusion, and negotiation of standard interfaces, rather than actual specification of components. Composition of

  3. The ARAMIS project: a concept robot and technical design.

    Science.gov (United States)

    Colizzi, Lucio; Lidonnici, Antonio; Pignolo, Loris

    2009-11-01

    To describe the ARAMIS (Automatic Recovery Arm Motility Integrated System) project, a concept robot applicable in the neuro-rehabilitation of the paretic upper limb after stroke. Methods, results and conclusion: The rationale and engineering of a state-of-the-art, hardware/software integrated robot system, its mechanics, ergonomics, electric/electronics features providing control, safety and suitability of use are described. An ARAMIS prototype has been built and is now available for clinical tests. It allows the therapist to design neuro-rehabilitative (synchronous or asynchronous) training protocols in which sample exercises are generated by a single exoskeleton (operated by the patient's unaffected arm or by the therapist's arm) and mirrored in real-time or offline by the exoskeleton supporting the paretic arm.

  4. A Tire Gasification Senior Design Project That Integrates Laboratory Experiments and Computer Simulation

    Science.gov (United States)

    Weiss, Brian; Castaldi, Marco J.

    2006-01-01

    A reactor to convert waste rubber tires to useful products such as CO and H2, was investigated in a university undergraduate design project. The student worked individually with mentorship from a faculty professor who aided the student with professional critique. The student was able to research the background of the field and conceive of a novel…

  5. Research and Development Projects with ICT and students as learning designers in Primary Schools: A methodological challenge

    DEFF Research Database (Denmark)

    Levinsen, Karin Ellen Tweddell; Sørensen, Birgitte Holm; Tosca, Susana

    of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices......In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... the Danish Ministry of Education named Development projects and pilot school experiments (Udviklingsprojekter med demonstrationsskoleforsøg vedr. it i folkeskolen – see Undervisningsministeriet 2013) in the spring 2013. The call was based on a governmental decision to allocate 500 million DKR to increase...

  6. Coordination of I and C design with the obligatory consideration of human factors. A project management approach

    International Nuclear Information System (INIS)

    Sanz, Silvia; Ciriello, Antonio; Krause, Wolfgang; Eisinger, Asriel

    2015-01-01

    Human Factors Engineering (HFE), like other engineering disciplines involved in plant design, cannot be considered retroactively. The engineering principles and methods derived from deep knowledge of the cognitive and perceptual capabilities and limitations of the plant's 'human element' are applied instead throughout plant design. Focusing HFE efforts on the plant's I and C, the plant's HMI is designed to ensure effective and error-free performance of the monitoring, control, and administrative tasks allocated to the control room crew. Generally speaking, a project's HFE program prescribes three main steps: (1) the analyses of plant monitoring and control functions in order to identify those to be performed manually (all others are performed automatically while still manually monitored) and determine in turn the HMI inventory of information displays, controls, alarms, and operating procedures required to support their performance, (2) the guided design of the plant's HMI, ensuring its compliance with HFE principles and the completeness and correctness of the task support it provides, and (3) the subsequent evaluation of operators performance, trained to follow the operating procedures and use the HMI referred to. The I and C systems designed to monitor and control the plant processes and implement, among other functions, the plant's HMI, are likely validated, governed by I and C norms and the project's V and V guidelines. Past experience shows that the three following obligatory steps pose challenges to project execution: (1) the acquisition and analysis of the multidisciplinary functional requirements (related to plant monitoring and control); (2) the likely interdisciplinary analysis whether and how fulfillment of these requirements shall be allocated to I and C automation systems or operators (or both), and (3) the HFE-guided HMI design and validation. A timely and cost-effective application of HFE to I and C engineering can be achieved by adequate planning and

  7. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  8. Microgrids project. Part 2. Design of an electrification kit with high content of renewable energy sources in Senegal

    Energy Technology Data Exchange (ETDEWEB)

    Alzola, J.A.; Santos, M. [Robotiker Tecnalia, Parque Tecnologico, Edificio 202, 48170 Zamudio (Spain); Vechiu, I. [ESTIA Recherche Technopole Izarbel, 64210 Bidart (France); Camblong, H. [ESTIA Recherche Technopole Izarbel, 64210 Bidart (France); Electrical Engineering Department, University of the Basque Country (E.U.P.-D), Europa Plaza 1, 20018 Donostia - San Sebastian (Spain); Sall, M. [Centre d' Etudes et de Recherches sur les Energies Renouvelables (UCAD) (Senegal); Sow, G. [Laboratoire des Energies Renouvelables (LER), Ecole Sup. Polytechnique, Dakar (Senegal)

    2009-10-15

    Senegal is one of the less developed countries in the world (position 158 in a list of 174 countries). 85% of its rural population does not have access to electricity and there's no doubt that this is an important barrier for socio-economic development. In this context, the project Microgrids aims at contributing to solve this problem. This project is part of the Intelligent Energy - Europe Programme supported by the European Commission. Its objective is the promotion and dissemination of the use of micro-grids with high content of Renewable Energy Sources (RES) for the electrification of villages far away from the grid in Senegal. One of the results of the project was the analysis of rural electrification needs, which is described in another paper [Camblong H, Sarr J, Niang AT, Curea O, Alzola JA, Sylla EH, Santos M. Microgrids project, part 1: analysis of rural electrification with high content of renewable energy sources in Senegal. Renewable Energy, submitted for publication.]. This paper presents the design of an electrification kit based on the information provided by that analysis [Analyse des besoins locaux pour l'electrification de zones rurales au Senegal. Technical report of Microgrids project; 2007. Available from: http://www.microgrids-eie.com.]. After identifying necessary previous conditions for the sustainability of any electrification project, a methodology is proposed for the design of the electrification kit. This methodology is applied to a typical village and results are extended to differently sized villages in the areas of Thies, Fatick and Kaolack. Economic considerations are also included to establish the relationship between electrification costs and paying capability of the communities. Now the Microgrids' consortium hopes to set-up a new project to apply the designed kit on some rural non-electrified villages. (author)

  9. Editorial JAI edisi Januari 2017

    Directory of Open Access Journals (Sweden)

    Harjanti Widiastuti

    2016-10-01

    riset akuntansi, yakni Universitas Gadjah Mada, Univer-sitas Indonesia, Universitas Airlangga, Universitas Mataram, dan Universitas Muhammadiyah Yogya-karta.Isu yang diangkat cukup beragam. Mulai dari isu kualitas laba pada era pengadopsian International Financial Reporting Standard (IFRS oleh Tri Utami dan Indra Wijaya Kusuma,  Rahma Wijayanti dan Vera Diyanti mengupas isu volatilitas laba pada entitas perbankan syariah dan konvensional yang masih dalam isu pengadopsian IFRS, dan ada pula isu-isu akuntansi sektor publik yang tentunya masih sangat hangat untuk diteliti.  Secara spesifik, artikel-artikel akuntansi secktor publik tersebut mengupas fenomena audit di pemerintah daerah oleh Hasanati, Akram, Muh, Irwan, dan juga isu akuntabilitas keuangan peme-rintah daerah dalam isu akuntansi berbasis akrual oleh Baiq Nurrizkiana, Lilik Handayani, Erna Widias dan Dwi Anugrah Putra, Prayitno Basuki, Sri Pancawati Martiningsih.Selanjutnya, Niluh Putu Dian Rosalina Handayani Narsa dan Kadek Pranetha Prananjaya meneliti isu perilaku etis secara mendalam dengan menghadirkan variabel yang masuk dalam kategori internal dan eksternal. Selanjutnya ada pula isu terkait kemampuan mendeteksi kecurangan dalam fenomena Kantor Akuntan Publik (KAP kecil, financial disress, dan framing information effect pada implementasi IFRS 8 dan PSAK 5, yang semuanya merupakan artikel dari peneliti Univer-sitas Muhammadiyah Yogyakarta.Untuk lebih jelasnya, pembaca dapat menyimak semua artikel tersebut pada JAI Volume 18 Nomor 1, edisi Januari 2017 ini yangtersedia secara online di laman berikut:http://journal.umy.ac.id/index.php/ai/issue/view/251Semoga apa yang dihadirkan oleh JAI dapat menjadi manfaat untuk perkembangan ilmu akuntansi baik secara teoritis maupun praktis, serta menjadi kebaikan bagi para penulis artikel dan pengelola JAI. Amin ya rabbal ‘alamin. Selamat membaca !.Wassalam, Yogyakarta, 1 April 2016Editor in Chief  JAI Harjanti Widiastuti

  10. Functional design criteria radioactive liquid waste line replacement, Project W-087. Revision 3

    International Nuclear Information System (INIS)

    McVey, C.B.

    1994-01-01

    This document provides the functional design criteria for the 222-S Laboratory radioactive waste drain piping and transfer pipeline replacement. The project will replace the radioactive waste drain piping from the hot cells in 222-S to the 219-S Waste Handling Facility and provide a new waste transfer route from 219-S to the 244-S Catch Station in Tank Farms

  11. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  12. Inverse axial mounting stiffness design for lithographic projection lenses.

    Science.gov (United States)

    Wen-quan, Yuan; Hong-bo, Shang; Wei, Zhang

    2014-09-01

    In order to balance axial mounting stiffness of lithographic projection lenses and the image quality under dynamic working conditions, an easy inverse axial mounting stiffness design method is developed in this article. Imaging quality deterioration at the wafer under different axial vibration levels is analyzed. The desired image quality can be determined according to practical requirements, and axial vibrational tolerance of each lens is solved with the damped least-squares method. Based on adaptive interval adjustment, a binary search algorithm, and the finite element method, the axial mounting stiffness of each lens can be traveled in a large interval, and converges to a moderate numerical solution which makes the axial vibrational amplitude of the lens converge to its axial vibrational tolerance. Model simulation is carried out to validate the effectiveness of the method.

  13. Hydraulic analysis and optimization design in Guri rehabilitation project

    Science.gov (United States)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  14. Design of training programs for a positive youth development program: Project P.A.T.H.S. in Hong Kong.

    Science.gov (United States)

    Shek, Daniel T L; Chak, Yammy L Y

    2010-01-01

    To facilitate the implementation of the Secondary 1 to Secondary 3 program of the Project P.A.T.H.S. in Hong Kong, systematic training programs are designed for the potential program implementers. The rationales, objectives and design of the Secondary 1 to Secondary 3 training programs are outlined in this paper. The training programs cover theories of adolescent development, positive youth development, background and curricula of the Project P.A.T.H.S., factors affecting program implementation quality and evaluation of the project. Besides introducing the curriculum units, the training programs also focus on nature of learning and related theories (particularly experiential learning), teaching methods and instructional techniques, motivating students, and classroom management.

  15. Task Design for Intercultural Telecollaboration in Secondary Schools: Insights from the EU project TILA

    Science.gov (United States)

    Hoffstaedter, Petra; Kohn, Kurt

    2014-01-01

    Our contribution focuses on synchronous oral telecollaboration in secondary schools. With reference to the EU project TILA, aspects of task design and implementation are discussed against the backdrop of issues of technological quality in connection with class organisation in computer labs. Case study evidence is provided in favour of the…

  16. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  17. Decision-making in the Pre-design Stage of Sustainable Building Renovation Projects

    DEFF Research Database (Denmark)

    Gade, Anne Nørkjær; Jensen, Rasmus Lund; Larsen, Tine Steen

    2017-01-01

    There is a great potential in renovating our existing building stock, in terms of improving environmental, economic and social qualities. Meeting the increasing performance requirements for sustainable construction entails an increasing level of complexity in the design process of both new...... buildings and renovation projects. Decision support tools are one solution that can help the building owner manage this complexity. This study investigates the current decision-making processes among Danish professional building owners, in order to propose a conceptual framework for future decision support...... tools for sustainable renovation. Design Science Research Methodology has been used as the main methodological framework. Current practices for setting goals for sustainability, determining the current state of the buildings and prioritizing which buildings to renovate within a building portfolio, have...

  18. IPAD project overview

    Science.gov (United States)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  19. : Urban design, urban project, urban art, urban composition ... a question of vocabulary?

    OpenAIRE

    Pinson , Daniel

    2014-01-01

    Actes à paraître; International audience; The term "urbanism" of Pierre Clerget (1910) put the mess in the practice and the formations in France. Urban planning is thus, on the academic level, a coexistence of disciplinary approaches, which does not help to a multidisciplinary urban training. Thinking about "urban design", after beautifull city, urban composition, or alongside the urban project and other territorial approaches can help to see more clearly in town planning.; Le terme « urbanis...

  20. Midwest Forensics Resource Center Project Summary June 2005

    Energy Technology Data Exchange (ETDEWEB)

    David Baldwin

    2005-06-01

    The mission of the MFRC Research and Development Program, is to provide technological advances in forensic science for the benefit of our regional partners as well as the forensic community at large. Key areas of forensic science need are identified through our interactions with our Midwest partners and our R&D advisory group, as well as through our participation in national meetings in forensic science. Under the sponsorship of the National Institute of Justice, the MFRC solicits proposals for the development of practical and useful technology, instrumentation, and methodology that address needs in areas related to forensic science and its application to operational crime laboratories. The MFRC facilitates proposal development by working to establish partnerships between researchers and our regional partners. The MFRC administers a peer-review of the proposals and then funds the selected projects at a cost of approximately $55,000 each, with a 12-month period of performance. The process for selection of these projects includes the following steps: (1) drafting of a call for proposals by MFRC staff, (2) review of the draft call by members of the R&D advisory committee, (3) review and approval of the call by NIJ, (4) issuance of the call to ISU, Ames Laboratory, regional partners, and research organizations, (5) receipt of proposals, (6) review of proposals by R&D advisory committee, (7) ranking and selection by MFRC staff using advisory committee reviews, with concurrence by NIJ, (8) notification of proposers, (9) receipt and review of progress reports by MFRC, (10) receipt and review of final reports by MFRC, R&D advisory committee, and NIJ. The decision to fund any specific project is based upon a peer-reviewed call-for-proposal system administered by the MFRC. The reviewers are crime laboratory specialists and scientists who are asked to rate the proposals on four criteria areas including: (1) relevance to the mission of the MFRC, (2) technical approach and

  1. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  2. New Concepts in Fish Ladder Design, Part I of IV, Summary Report, 1982-1984 Final Project Report.

    Energy Technology Data Exchange (ETDEWEB)

    Orsborn, John F.

    1985-08-01

    The report looks at the most active periods of fishway research since 1938 as background for a project to apply fundamental fluid and bio-mechanics to fishway design, and develop more cost effective fish passage facilities with primary application to small scale hydropower facilities. Also discussed are new concepts in fishway design, an assessment of fishway development and design, and an analysis of barriers to upstream migration. (ACR)

  3. Quality monitoring in infrastructural design-build projects : the analysis of an audit-based monitoring system

    NARCIS (Netherlands)

    Favie, R.

    2010-01-01

    The roles of stakeholders in traditional construction projects were clear: the client was both responsible and liable for developing a detailed design and specifications and the construction companies had to build in accordance with these specifications. The use of integrated contracts e.g.

  4. The ESDRED project: Engineering studies and demonstration of repository designs

    International Nuclear Information System (INIS)

    Verstricht, J.

    2009-01-01

    The construction, operation and closure of a deep geological repository for spent fuel and long-lived radioactive waste in clay involves specific technologies. The demonstration of these techniques at an industrial scale is being carried out in the frame of a technological integrated project within the sixth Framework Programme of EURATOM. The Belgian design for high level waste disposal is based on the so-called Supercontainer concept. Within this concept, the waste is encased in a carbon steel overpack, which is consequently fitted into a 70 cm thick concrete shell, in its turn enveloped by a stainless steel liner. A Supercontainer measures about 2 m in diameter. In the design of the repository, the Supercontainers will be emplaced, one after the other, in disposal galleries. The space between the Supercontainers and the gallery lining needs to be filled up with a solid material. The most essential function of this component, referred to as backfill, is to prevent a collapse of the gallery. A secondary function is to limit the presence of free oxygen, to limit corrosion. In the ESDRED project EIG EURIDICE, together with SCK-CEN and ONDRAF/NIRAS, investigates technologies to apply the backfill. After testing two techniques to apply the backfill in 2007 at limited scale (unite with granular material and grouting with backfill mortar), grouting was selected as the preferred technique. This technique then should be tested at full-scale (30 m long mock-up). First, a full-scale structure needs to built, including an extensive instrumentation programme. In addition, the logistical needs to ensure a continuous backfill operation have to be worked out. The objective is to have the almost 100 m 3 backfilled in 4 hours

  5. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  6. SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.A. (PlanEnergi, Skoerping (Denmark)); Moeller Nielsen, C. (Dronninglund Fjernvarme, Dronninglund (Denmark)); Baunwall, M. (NIRAS Aalborg (Denmark)); Munkholt, H. (GG-Construction, Aalborg (Denmark)); Paaske, B. (Teknologisk Institut, AArhus (Denmark)); Schmidt, T. (SOLITES, Stuttgart (Germany))

    2011-03-15

    The objective of the project has been to carry out detailed design and tendering for a heat production plant consisting of: - 35.000 m{sub 2} solar thermal collectors, - 60.000 m{sub 3} pit heat storage, - 3 MW{sub heat} heat pump, covering app. 50% of the heat production at Dronninglund district heating plant (Denmark). The final report for the project includes detailed design of the pit heat storage (a further development of a 10.000 m{sub 3} storage implemented in Marstal) and simulation of the total production system in the simulation software TRNSYS. (ln)

  7. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  8. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  9. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  10. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  11. Undergraduate Electronics Projects Based on the Design of an Optical Wireless Audio Transmission System

    Science.gov (United States)

    Oliveira, Luis Bica; Paulino, Nuno; Oliveira, João P.; Santos-Tavares, Rui; Pereira, Nuno; Goes, João

    2017-01-01

    The two projects presented in this paper can be used either as two separate assignments in two different semesters or as a final assignment for undergraduate students of electrical engineering. They have two main objectives: first, to teach basic electronic circuit design concepts and, second, to motivate the students to learn more about analog…

  12. Designing a lessons learned model to improve the success of new product development in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad

    2016-12-01

    Full Text Available Nowadays, project-based organizations need to utilize intellectual capital and knowledge to become leader in their business activities. The new approach to use knowledge based skills from one side and development of the new complicated products from the other side have increased the need for designing a lessons learned model. The purpose of this paper is to design a lessons learned model to improve the success of new product development for project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 56 experts who were well informed about various techniques of new product development and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The results of the survey have indicated that there were positive and meaningful relationships between lessons learned components and the success of the new product development.

  13. Implementasi Algoritma Pengenalan Wajah Untuk Mendeteksi Visual Hacking

    OpenAIRE

    Alexander, Luisan William; Sentinuwo, Steven; sambul, alwin

    2017-01-01

    Visual Hacking merupakan sebuah isu keamanan dan privasi data yang perlu diperhatikan saat ini, dimana visual hacking berfokus pada pencurian informasi yang terpampang pada tampilan elektronik, seperti layar monitor komputer. Isu ini dapat terjadi ketika pengguna membiarkan informasi terpampang pada layar komputer sehingga dapat dilihat oleh siapa saja. Pada penelitian ini, dibuatlah sebuah aplikasi berbasis computer vision dengan tujuan mengimplementasikan algoritma pengenalan wajah eigenfac...

  14. Pemanfaatan Limbah Biomassa Cangkang Kakao Dan Kemiri Sebagai Bahan Bakar Briket (Utilization of Biomass Wastes From Cocoa and Candlenut Shells as Fuel Briquette)

    OpenAIRE

    Saptoadi, Harwin; Syamsiro, Moch; Tambunan, Bisrul Hapis

    2007-01-01

    ABSTRAK  Biomassa adalah sumber energi utama jutaan manusia di dunia, akan tetapi penggunaannya menurun ketika batubara, minyak dan gas tersedia cukup melirnpah. Namun akhir-akhir ini perhatian muncul kembali karena terjadinya krisis energi dan isu-isu lingkungan. Pemanfaatan biomassa untuk menggantikan bahan bakar fosil dapat menurunkan persoalan emisi CO2 global. Penelitian ini bertujuan untuk mengkaji alternatif sumber energi terbarukan dengan pemanfaatan limbah biomassa cangkang kakao...

  15. Reflections on the future of veterinary medical education.

    Science.gov (United States)

    Prasse, Keith W

    2009-01-01

    Dr. Keith Prasse is a very distinguished leader in veterinary education. He started his career achieving his BS and DVM degrees from Iowa State University (ISU). He returned to ISU after a brief period in private practice in Illinois. His well-recognized career in veterinary pathology began with his MS and PhD degrees, followed by a five-year period of teaching at ISU. Dr. Prasse joined the faculty of the University of Georgia in 1972, and thus began a long-term partnership with Dr. Bob Duncan that is arguably the foundation of veterinary clinical pathology. The textbook they authored, Veterinary Laboratory Medicine: Clinical Pathology, or "Duncan and Prasse" as it is known, remains the standard today, with later participation from Dr. Ed Mahaffey and most recently Dr. Ken Latimer. Dr. Prasse has mentored numerous graduate students and received many awards over his 23-year career in teaching, including the Norden Distinguished Teaching award twice, once at ISU and once at Georgia. His leadership as President of the American College of Veterinary Pathologists was greatly acknowledged and appreciated. Dr. Prasse's administrative service at the University of Georgia spanned 14 years, first as Associate Dean for Public Service and Outreach and later as Dean for eight years, during which time he served as President of the Association of American Veterinary Medical Colleges (AAVMC). The growth of the College of Veterinary Medicine under Dean Prasse's visionary leadership was extraordinary. He led through difficult economic and political times, yet the college and its community continued to prosper. His legacy at the University of Georgia is indelible and perpetual. His outstanding leadership of the college was recognized by the Georgia Veterinary Medical Association in 2004, when he was given the Georgia Veterinarian of the Year award. Since his retirement from Georgia, Dr. Prasse has contributed greatly to the profession and to the AAVMC by leading the Foresight project

  16. Spent nuclear fuel project design basis capacity study

    Energy Technology Data Exchange (ETDEWEB)

    Cleveland, K.J.

    1996-09-09

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  17. Molecular Cloning Designer Simulator (MCDS): All-in-one molecular cloning and genetic engineering design, simulation and management software for complex synthetic biology and metabolic engineering projects.

    Science.gov (United States)

    Shi, Zhenyu; Vickers, Claudia E

    2016-12-01

    Molecular Cloning Designer Simulator (MCDS) is a powerful new all-in-one cloning and genetic engineering design, simulation and management software platform developed for complex synthetic biology and metabolic engineering projects. In addition to standard functions, it has a number of features that are either unique, or are not found in combination in any one software package: (1) it has a novel interactive flow-chart user interface for complex multi-step processes, allowing an integrated overview of the whole project; (2) it can perform a user-defined workflow of cloning steps in a single execution of the software; (3) it can handle multiple types of genetic recombineering, a technique that is rapidly replacing classical cloning for many applications; (4) it includes experimental information to conveniently guide wet lab work; and (5) it can store results and comments to allow the tracking and management of the whole project in one platform. MCDS is freely available from https://mcds.codeplex.com.

  18. Teaching Power Electronics with a Design-Oriented and Project-Based Learning Method at the Technical University of Denmark

    DEFF Research Database (Denmark)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast developing technology within the electrical engineering field. This paper presents the results and experiences gained from DesignOriented Project Based Learning of switch-mode power supply design within a power electronics course at the Technical University of Denmark...... (DTU). Project-based learning (PBL) is known to be a motivating and problem-centered teaching method that not only places students at the core of the teaching and learning activities but also gives students the ability to transfer their acquired scientific knowledge into industrial practices. Students...... are asked to choose a specification from different power converter applications such as a fuel cell power conditioning converter, a light-emitting diode (LED) driver or a battery charger. Based upon their choice, the students select topology, design magnetic components, calculate input/output filters...

  19. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  20. The human early-life exposome (HELIX): project rationale and design.

    Science.gov (United States)

    Vrijheid, Martine; Slama, Rémy; Robinson, Oliver; Chatzi, Leda; Coen, Muireann; van den Hazel, Peter; Thomsen, Cathrine; Wright, John; Athersuch, Toby J; Avellana, Narcis; Basagaña, Xavier; Brochot, Celine; Bucchini, Luca; Bustamante, Mariona; Carracedo, Angel; Casas, Maribel; Estivill, Xavier; Fairley, Lesley; van Gent, Diana; Gonzalez, Juan R; Granum, Berit; Gražulevičienė, Regina; Gutzkow, Kristine B; Julvez, Jordi; Keun, Hector C; Kogevinas, Manolis; McEachan, Rosemary R C; Meltzer, Helle Margrete; Sabidó, Eduard; Schwarze, Per E; Siroux, Valérie; Sunyer, Jordi; Want, Elizabeth J; Zeman, Florence; Nieuwenhuijsen, Mark J

    2014-06-01

    Developmental periods in early life may be particularly vulnerable to impacts of environmental exposures. Human research on this topic has generally focused on single exposure-health effect relationships. The "exposome" concept encompasses the totality of exposures from conception onward, complementing the genome. The Human Early-Life Exposome (HELIX) project is a new collaborative research project that aims to implement novel exposure assessment and biomarker methods to characterize early-life exposure to multiple environmental factors and associate these with omics biomarkers and child health outcomes, thus characterizing the "early-life exposome." Here we describe the general design of the project. In six existing birth cohort studies in Europe, HELIX will estimate prenatal and postnatal exposure to a broad range of chemical and physical exposures. Exposure models will be developed for the full cohorts totaling 32,000 mother-child pairs, and biomarkers will be measured in a subset of 1,200 mother-child pairs. Nested repeat-sampling panel studies (n = 150) will collect data on biomarker variability, use smartphones to assess mobility and physical activity, and perform personal exposure monitoring. Omics techniques will determine molecular profiles (metabolome, proteome, transcriptome, epigenome) associated with exposures. Statistical methods for multiple exposures will provide exposure-response estimates for fetal and child growth, obesity, neurodevelopment, and respiratory outcomes. A health impact assessment exercise will evaluate risks and benefits of combined exposures. HELIX is one of the first attempts to describe the early-life exposome of European populations and unravel its relation to omics markers and health in childhood. As proof of concept, it will form an important first step toward the life-course exposome.

  1. W.A. Parish Post Combustion CO2 Capture and Sequestration Project Final Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Armpriester, Anthony [Petra Nova Parish Holdings, Washington, DC (United States)

    2017-02-17

    The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will use Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.

  2. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  3. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Billett, B.; Brajuskovic, B.; Carter, J.; Kirkus, E.; Lale, M.; Lerch, J.; Noonan, J.; O' Neill, M.; Rocke, B.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  4. 23 CFR 636.116 - What organizational conflict of interest requirements apply to design-build projects?

    Science.gov (United States)

    2010-04-01

    ... nature of the potential conflict as seen by the owner; (iii) States the nature of the proposed restraint... 23 Highways 1 2010-04-01 2010-04-01 false What organizational conflict of interest requirements... What organizational conflict of interest requirements apply to design-build projects? (a) State...

  5. Designing an intranet from scratch to sketch: experiences from techniques used in the IDEnet project

    DEFF Research Database (Denmark)

    Berndtsson, Johan

    1999-01-01

    The choice of techniques to support system design is important in order to achieve a satisfactory result with regard to the quality of the future system. In the IDEnet development project, we chose to work with techniques used within, or inspired by, three different research areas: sociology...

  6. The application and development on radiation monitoring microcomputer management system in design of a certain project

    International Nuclear Information System (INIS)

    Zhang Hongyou

    1993-01-01

    A scheme of a radiation monitoring system with a RMMMS (Radiation Monitoring Microcomputer Management System) has been designed for the first time in the radiation protection design of a certain nuclear projection undertaken by the BINE (Beijing Institute of Nuclear Engineering). Meanwhile, we accepted the research task of the RMMMS that can manage 40 monitoring channel. The key factors of radiation monitors, microcomputer, information management and systematic design method are considered in the development of the RMMMS. This paper presents briefly the scheme and functions of the RMMMS

  7. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  8. A layout designer's data projection reticle. [for optimum indicator instrument location in aircraft

    Science.gov (United States)

    Haines, R. F.

    1977-01-01

    The designer's projection reticle is a modified surplus weapons sighting device consisting of a 3.5 cm diameter, 8.9 focal length coated objective lens. It is placed 1.5 cm in front of a clear flat glass plate on which the aluminized reflective pattern has been deposited. Reflected light passes through the objective lens, off the front surface of the coating, and off the rear coated surface of the objective lens. Several reticle patterns have been designed and tested, and other patterns are in the planning stage. The device may be used for a variety of applications including determining the optimum locations on a cockpit panel for luminous warning indicators requiring rapid manual responses.

  9. Efficient methods for solving discrete topology design problems in the PLATO-N project

    DEFF Research Database (Denmark)

    Canh, Nam Nguyen; Stolpe, Mathias

    This paper considers the general multiple load structural topology design problems in the framework of the PLATO-N project. The problems involve a large number of discrete design variables and were modeled as a non-convex mixed 0–1 program. For the class of problems considered, a global...... optimization method based on the branch-and-cut concept was developed and implemented. In the method a large number of continuous relaxations were solved. We also present an algorithm for generating cuts to strengthen the quality of the relaxations. Several heuristics were also investigated to obtain efficient...... algorithms. The branch and cut method is used to solve benchmark examples which can be used to validate other methods and heuristics....

  10. Design criteria document, Fire Protection Task, K Basin Essential Systems Recovery, Project W-405

    International Nuclear Information System (INIS)

    Johnson, B.H.

    1994-01-01

    The K Basin were constructed in the early 1950's with a 20 year design life. The K Basins are currently in their third design life and are serving as a near term storage facility for irradiated N Reactor fuel until an interim fuel storage solution can be implemented. In April 1994, Project W-405, K Basin Essential Systems Recovery, was established to address (among other things) the immediate fire protection needs of the 100K Area. A Fire Barrier Evaluation was performed for the wall between the active and inactive areas of the 105KE and 105KW buildings. This evaluation concludes that the wall is capable of being upgraded to provide an equivalent level of fire resistance as a qualified barrier having a fire resistance rating of 2 hours. The Fire Protection Task is one of four separate Tasks included within the scope of Project W405, K Basin Essential systems Recovery. The other three Tasks are the Water Distribution System Task, the Electrical System Task, and the Maintenance Shop/Support Facility Task. The purpose of Project W-405's Fire Protection Task is to correct Life Safety Code (NFPA 101) non-compliances and to provide fire protection features in Buildings 105KE, 105KW and 190KE that are essential for assuring the safe operation and storage of spent nuclear fuel at the 100K Area Facilities' Irradiated Fuel Storage Basins (K Basins)

  11. Design of a {O}94 cm mirror mount for the Petawatt Project on Nova

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, R.; Tietbohl, G.L.

    1995-10-01

    The authors have designed a large optical gimbal mount that will be used on the Petawatt Project currently under construction on the Nova laser. These mounts are designed to hold and tilt {O}94 cm mirrors and gratings that will redirect the {O}60 cm beam through the Petawatt vacuum compressor. Lacking the commercial availability to house this size optic, they have engineered a large mirror mount with a high natural frequency (42 Hz), low self-weight deflection of the mirror (< {lambda}/46), and high positioning accuracy characteristics (< 1 {micro}rad using flexures and stepping motors). Analysis details and methodology are presented.

  12. Design of a OE 94 cm mirror mount for the Petawatt Project on Nova

    International Nuclear Information System (INIS)

    Hamilton, R.; Tietbohl, G.L.

    1995-10-01

    The authors have designed a large optical gimbal mount that will be used on the Petawatt Project currently under construction on the Nova laser. These mounts are designed to hold and tilt OE 94 cm mirrors and gratings that will redirect the OE 60 cm beam through the Petawatt vacuum compressor. Lacking the commercial availability to house this size optic, they have engineered a large mirror mount with a high natural frequency (42 Hz), low self-weight deflection of the mirror (< λ/46), and high positioning accuracy characteristics (< 1 microrad using flexures and stepping motors). Analysis details and methodology are presented

  13. Project Solaris, a Global Network of Autonomous Observatories: Design, Commissioning, and First Science Results

    Science.gov (United States)

    Kozłowski, S. K.; Sybilski, P. W.; Konacki, M.; Pawłaszek, R. K.; Ratajczak, M.; Hełminiak, K. G.; Litwicki, M.

    2017-10-01

    We present the design and commissioning of Project Solaris, a global network of autonomous observatories. Solaris is a Polish scientific undertaking aimed at the detection and characterization of circumbinary exoplanets and eclipsing binary stars. To accomplish this, a network of four fully autonomous observatories has been deployed in the Southern Hemisphere: Solaris-1 and Solaris-2 in the South African Astronomical Observatory in South Africa; Solaris-3 in Siding Spring Observatory in Australia; and Solaris-4 in Complejo Astronomico El Leoncito in Argentina. The four stations are nearly identical and are equipped with 0.5-m Ritchey-Crétien (f/15) or Cassegrain (f/9, Solaris-3) optics and high-grade 2 K × 2 K CCD cameras with Johnson and Sloan filter sets. We present the design and implementation of low-level security; data logging and notification systems; weather monitoring components; all-sky vision system, surveillance system; and distributed temperature and humidity sensors. We describe dedicated grounding and lighting protection system design and robust fiber data transfer interfaces in electrically demanding conditions. We discuss the outcomes of our design, as well as the resulting software engineering requirements. We describe our system’s engineering approach to achieve the required level of autonomy, the architecture of the custom high-level industry-grade software that has been designed and implemented specifically for the use of the network. We present the actual status of the project and first photometric results; these include data and models of already studied systems for benchmarking purposes (Wasp-4b, Wasp-64b, and Wasp-98b transits, PG 1663-018, an eclipsing binary with a pulsator) as well J024946-3825.6, an interesting low-mass binary system for which a complete model is provided for the first time.

  14. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  15. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  16. Politico-Islamic Issues in Malaysia in 1999

    OpenAIRE

    Abubakar, Ibrahim

    2001-01-01

    Tulisan ini merupakan kajian singkat sekitar isu politik Islam di Malaysia tahun 1999. Pada November 1999, Malaysia menyelenggarakan pemilihan Federal dan Negara Bagian yang ke-10. Titik berat tulisan ini ada pada beberapa isu politik Islam yang dipublikasikan di koran-koran Malaysia yang dilihat dari perspektif partai-partai politik serta para pendukmgnya. Partai politik di Malaysia cukup banyak, dan disini diangkat empat partai politik yaitu: Organisasi Nasional Malaysia Bersatu (UMNO), Aso...

  17. Spent nuclear fuel project design basis capacity study

    International Nuclear Information System (INIS)

    Cleveland, K.J.

    1998-01-01

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration

  18. Manufacturing of cells and stacks for SOFC development, test and demonstration projects and SOFC hotbox design development

    Energy Technology Data Exchange (ETDEWEB)

    2008-09-15

    The purpose of this project is to support the continued SOFC development through manufacturing process optimization and manufacturing of SOFC cells and stacks. These cells and stacks will serve as a necessary base for the development activities and for the establishment of a number of test and demonstration activities. The manufacture will also help provide operating experience and reduce manufacturing cost. Another main focus of the manufacturing is to assure technical improvements and reliability. It is imperative to the eventual success of the technology that test and demonstration is carried out in the pre-market conditions that will exist for the next years in the three market segments targeted by TOFC (Distributed generation, micro CHP and APU incl. marine APU). Finally, the project also includes development activities focusing on the stack-system interface (hotbox design development) and on dealing with transients and start up and shut down times, which is of particular importance for APU and micro CHP applications. Three topics are addressed:1) Cell manufacture, including production development, capacity lift and manuf. of cells for test and demonstration; 2) Stack manufacture and test, including a test facility, stack manuf. and test of stacks in a system at HCV; 3) Hotbox design development, including design, prototype construction and testing. The progress of this project is documented. Major achievements are successful manufacture of adequate amounts of cells and stacks according to the application. Furthermore significant over-performance in design, construction and test of a methanol based hotbox prototype as well as publication of this. (au)

  19. Status of the design and safety project for the sodium-cooled fast reactor as a generation IV nuclear energy system

    International Nuclear Information System (INIS)

    Niwa, Hajime; Fiorini, Gian-Luigi; Sim, Yoon-Sub; Lennox, Tom; Cahalan, James E.

    2005-01-01

    The Design and Safety Project Management Board (DSPMB) was established under the Sodium Cooled Fast Reactor (SFR) System Steering Committee (SSC) in the Generation IV international Forum. The DSPMB will promote collaborative R and D activities on reactor core design, and safety assessment for candidate systems, and also integrate these results together with those from other PMBs such as advanced fuel and component to a whole fast reactor system in order to develop high performance systems that will satisfy the goals of Generation IV nuclear energy systems. The DSPMB has formulated the present R and D schedules for this purpose. Two SFR concepts were proposed: a loop-type system with primarily a MOX fuel core and a pool-type system with a metal fuel core. Study of innovative systems and their evaluation will also be included. The safety project will cover both the safety assessment of the design and the preparation of the methods/tools to be used for the assessment. After a rather short viability phase, the project will move to the performance phase for development of performance data and design optimization of conceptual designs. This paper describes the schedules, work packages and tasks for the collaborative studies of the member countries. (author)

  20. Supplier integration in product development: A matter of designing the project structure

    Directory of Open Access Journals (Sweden)

    Mike Danilovic

    2007-11-01

    Full Text Available In product development close collaboration between systems integrators and suppliers is important. The purpose of this article is to investigate the impact of the work breakdown structure (WBS and work packages (WPs in product development on the possibility of carrying through the strategy of supplier involvement into collaborative practice and to investigate how supplier involvement can be improved by altering the design of collaborative WBS and WP structures. Dependence Structure Matrix (DSM is introduced in order to analyse, visualise and manage interdependencies, in terms of information exchange between the systems integrator and supplier. This article shows how DSM can support the alternative design of integrated and collaborative WBS and integrated WPs following the logic of dependencies and the flow of information in order to support a strategy focusing on integration of suppliers on project and team level.

  1. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  2. Developing Physics Concepts through Hands-On Problem Solving: A Perspective on a Technological Project Design

    Science.gov (United States)

    Hong, Jon-Chao; Chen, Mei-Yung; Wong, Ashley; Hsu, Tsui-Fang; Peng, Chih-Chi

    2012-01-01

    In a contest featuring hands-on projects, college students were required to design a simple crawling worm using planning, self-monitoring and self-evaluation processes to solve contradictive problems. To enhance the efficiency of problem solving, one needs to practice meta-cognition based on an application of related scientific concepts. The…

  3. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  4. Synthesis of results obtained on sodium components and technology through the Generation IV International Forum SFR Component Design and Balance-of-Plant Project

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Rodriguez, G.; Kisohara, N.; Kim, J. B.; Gerber, A.; Ashurko, Y.; Toyama, S.

    2013-01-01

    Status: The viability of designing SFR components and BOP has been demonstrated with design, construction and operation of previous sodium-cooled reactors. The main objective of this R&D project is related to system performance, or by development on the use of AECS in the BOP that could allow further cost improvements. Objective: To conduct collaborative research and development of components and BOP for the SFR System. The Project has to satisfy the GIF’s criteria of safety, economy, sustainability, proliferation resistance and physical protection. Activities within this Project are addressing experimental and analytical evaluation of advanced ISI&R, LBB assessment, development of AECS with Brayton cycles, advanced SG technologies. Project activities will be based in part on the extensive historical R&D experience with component design and balance of plant for sodium-cooled fast reactors

  5. Design and simulation of the rotating test rig in the INDUFLAP project

    DEFF Research Database (Denmark)

    Barlas, Thanasis K.; Aagaard Madsen, Helge; Løgstrup Andersen, Tom

    The general description and objectives of the rotating test rig at the Risø campus of DTU are presented, as used for the aeroelastic testing of a controllable rubber trailing edge flap (CRTEF) system in the INDUFLAP project. The design of all new components is presented, including the electrical...... drive, the pitch system, the boom, and the wing/flap section. The overall instrumentation of the components used for the aeroelastic testing is described. Moreover, the aeroelastic model simulating the setup is described, and predictions of steady and dynamic loading along with the aeroelastic analysis...

  6. Designing an integrated model based on the indicators Quality and Earned Value for risk management in Information Technology Projects

    OpenAIRE

    TATLARI, Mohammad Reza; KAZEMİPOOR, Hamed

    2015-01-01

    There are two effective factors on Information Technology (IT) projects risk including quality and earned value so that by controlling these two factors and their increased level in IT projects, the corresponding risk can be decreased. Therefore in present study, an integrated model was designed based on quality and earned value indicators for risk management in IT projects on a new and efficient approach. The proposed algorithm included the steps such as preparing a list of several indicator...

  7. Building international experiences into an engineering curriculum - a design project-based approach

    Science.gov (United States)

    Maldonado, Victor; Castillo, Luciano; Carbajal, Gerardo; Hajela, Prabhat

    2014-07-01

    This paper is a descriptive account of how short-term international and multicultural experiences can be integrated into early design experiences in an aerospace engineering curriculum. Such approaches are considered as important not only in fostering a student's interest in the engineering curriculum, but also exposing them to a multicultural setting that they are likely to encounter in their professional careers. In the broader sense, this programme is described as a model that can be duplicated in other engineering disciplines as a first-year experience. In this study, undergraduate students from Rensselaer Polytechnic Institute (RPI) and Universidad del Turabo (UT) in Puerto Rico collaborated on a substantial design project consisting of designing, fabricating, and flight-testing radio-controlled model aircraft as a capstone experience in a semester-long course on Fundamentals of Flight. The two-week long experience in Puerto Rico was organised into academic and cultural components designed with the following objectives: (i) to integrate students in a multicultural team-based academic and social environment, (ii) to practise team-building skills and develop students' critical thinking and analytical skills, and finally (iii) to excite students about their engineering major through practical applications of aeronautics and help them decide if it is a right fit for them.

  8. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1997-01-01

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations

  9. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, W.W.

    1997-12-30

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

  10. Design, Fabrication and Testing of Medium-Beta 650 MHz SRF Cavity Prototypes for Project-X

    International Nuclear Information System (INIS)

    Marhauser, F.; Clemens, W.A.; Henry, J.; Kneisel, P.; Martin, R.; Rimmer, R.A.; Slack, G.; Turlington, L.; Williams, R.S.

    2011-01-01

    A new type of superconducting radio frequency (SRF) cavity shape with a shallow equator dome to reduce electron impact energies for suppressing multipacting barriers has been proposed. The shape is in consideration for the first time in the framework of Project-X to design a potential multi-cell cavity candidate for the medium-beta section of the SRF proton CW linac operating at 650 MHz. Rationales covering the design of the multi-cell cavity, the manufacture, post-processing and high power testing of two single-cell prototypes are presented.

  11. Molecular Cloning Designer Simulator (MCDS: All-in-one molecular cloning and genetic engineering design, simulation and management software for complex synthetic biology and metabolic engineering projects

    Directory of Open Access Journals (Sweden)

    Zhenyu Shi

    2016-12-01

    Full Text Available Molecular Cloning Designer Simulator (MCDS is a powerful new all-in-one cloning and genetic engineering design, simulation and management software platform developed for complex synthetic biology and metabolic engineering projects. In addition to standard functions, it has a number of features that are either unique, or are not found in combination in any one software package: (1 it has a novel interactive flow-chart user interface for complex multi-step processes, allowing an integrated overview of the whole project; (2 it can perform a user-defined workflow of cloning steps in a single execution of the software; (3 it can handle multiple types of genetic recombineering, a technique that is rapidly replacing classical cloning for many applications; (4 it includes experimental information to conveniently guide wet lab work; and (5 it can store results and comments to allow the tracking and management of the whole project in one platform. MCDS is freely available from https://mcds.codeplex.com. Keywords: BioCAD, Genetic engineering software, Molecular cloning software, Synthetic biology, Workflow simulation and management

  12. Ceodouro project : overall design of an OWC in the new OPorto break water

    Energy Technology Data Exchange (ETDEWEB)

    Martins, E.; Carrilho, L. [EDP, Lisboa (Portugal); Neumann, F. [Centro de Energia das Ondas, Lisboa (Portugal); Ramos, F. Silveira [Consulmar, Lisboa (Portugal); Justino, Paulo Alexandre [INETI/DER, Lisboa, (Portugal); Gato, L.M.C. [Dep. de Engenharia Mecanica, IST, Lisboa, (Portugal); Trigo, L. [Kymaner, S. Domingos de Rana, (Portugal)

    2005-07-01

    The purpose of this work is to present and describe the design approach of the integration of an OWC wave energy plant in a caisson breakwater to be built at the Portuguese northern coast as a promising solution towards sustainable port structures. The presentation of different case study results by Neumann and Sarmento (2000) suggested that such a combination turns out to be a realistic alternative to the traditional coastal protection schemes. The large Portuguese engineering consulting company Consulmar, being responsible for a number of coastal and maritime engineering projects, has accepted the challenge of leading a project for an OWC integration in a caisson breakwater head in Northern Portugal. After the concession of the breakwater construction in 2004, a Consortium has proceeded with preliminary works concerning the integration of an OWC into the breakwater. The Portuguese companies Labelec (EDP group), Kymaner (mechanical components), EFACEC (electrical components) and the Institutions IPTM (Port and Maritime Institute), LNEC (Hydraulic Laboratory), INETI (National Laboratory), IST (University) and the WEC (Wave Energy Centre) are further contributors in the planning phase. This paper presents an overall description of the project, its steps and present state of development.

  13. Hierarchy of Study Designs for Evaluating the Effectiveness of a STEM Education Project or Practice

    Science.gov (United States)

    Coalition for Evidence-Based Policy, 2007

    2007-01-01

    This document contains a narrative overview of the hierarchy, followed by a one-page graphic summary. The purpose of the hierarchy is to help agency/program officials assess which study designs are capable of producing scientifically-valid evidence on the effectiveness of a STEM education project or practice ("intervention"). More specifically,…

  14. An Exploratory Study of Self-Regulated Learning Strategies in a Design Project by Students in Grades 9-12

    Science.gov (United States)

    Lawanto, Oenardi; Butler, Deborah; Cartier, Sylvie; Santoso, Harry; Lawanto, Kevin; Clark, David

    2013-01-01

    This exploratory study evaluated self-regulated learning (SRL) strategies of 27 students in grades 9-12 during an engineering design project. The specific focus of the study was on student task interpretation and its relation to planning and cognitive strategies in design activities. Two research questions guided the study: (1) To what degree was…

  15. PeptideNavigator: An interactive tool for exploring large and complex data sets generated during peptide-based drug design projects.

    Science.gov (United States)

    Diller, Kyle I; Bayden, Alexander S; Audie, Joseph; Diller, David J

    2018-01-01

    There is growing interest in peptide-based drug design and discovery. Due to their relatively large size, polymeric nature, and chemical complexity, the design of peptide-based drugs presents an interesting "big data" challenge. Here, we describe an interactive computational environment, PeptideNavigator, for naturally exploring the tremendous amount of information generated during a peptide drug design project. The purpose of PeptideNavigator is the presentation of large and complex experimental and computational data sets, particularly 3D data, so as to enable multidisciplinary scientists to make optimal decisions during a peptide drug discovery project. PeptideNavigator provides users with numerous viewing options, such as scatter plots, sequence views, and sequence frequency diagrams. These views allow for the collective visualization and exploration of many peptides and their properties, ultimately enabling the user to focus on a small number of peptides of interest. To drill down into the details of individual peptides, PeptideNavigator provides users with a Ramachandran plot viewer and a fully featured 3D visualization tool. Each view is linked, allowing the user to seamlessly navigate from collective views of large peptide data sets to the details of individual peptides with promising property profiles. Two case studies, based on MHC-1A activating peptides and MDM2 scaffold design, are presented to demonstrate the utility of PeptideNavigator in the context of disparate peptide-design projects. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Design of the PET–MR system for head imaging of the DREAM Project

    International Nuclear Information System (INIS)

    González, A.J.; Conde, P.; Hernández, L.; Herrero, V.; Moliner, L.; Monzó, J.M.; Orero, A.; Peiró, A.; Rodríguez-Álvarez, M.J.; Ros, A.; Sánchez, F.; Soriano, A.; Vidal, L.F.; Benlloch, J.M.

    2013-01-01

    In this paper we describe the overall design of a PET–MR system for head imaging within the framework of the DREAM Project as well as the first detector module tests. The PET system design consists of 4 rings of 16 detector modules each and it is expected to be integrated in a head dedicated radio frequency coil of an MR scanner. The PET modules are based on monolithic LYSO crystals coupled by means of optical devices to an array of 256 Silicon Photomultipliers. These types of crystals allow to preserve the scintillation light distribution and, thus, to recover the exact photon impact position with the proper characterization of such a distribution. Every module contains 4 Application Specific Integrated Circuits (ASICs) which return detailed information of several light statistical momenta. The preliminary tests carried out on this design and controlled by means of ASICs have shown promising results towards the suitability of hybrid PET–MR systems

  17. Solar hydrogen project - Thermochemical process design

    Energy Technology Data Exchange (ETDEWEB)

    Allen, D.J.; Ng, L.F.; Rao, M.S.M.; Wu, S.F.; Zoschak, R.J.

    1984-08-01

    The thermochemical decomposition of water using solar energy offers an elegant way of combining solar and chemical technologies to produce a high quality fuel. The DOE has sponsored Foster Wheeler to develop a process design for a solar water-splitting process based on the sulfuric acid/iodine cycle. The study has centered around the design of a sulfuric acid decomposition reactor and the central receiver. Materials' properties impose severe constraints upon the design of decomposition reactor. In this paper, the constraints imposed on the design are specified and a reactor and receiver design is presented together with a preliminary design of the balance of plant.

  18. Improving collaborative work and project management in a nuclear power plant design team: A human-centered design approach

    International Nuclear Information System (INIS)

    Boy, Guy André; Jani, Gopal; Manera, Annalisa; Memmott, Matthew; Petrovic, Bojan; Rayad, Yassine; Stephane, Lucas; Suri, Neha

    2016-01-01

    This article presents a collaborative system, called SCORE, useful for a multi-disciplinary team designing a new nuclear power plant (NPP). It was developed during the first phase of the I 2 S-LWR project (Integral Inherently Safe Light Water Reactor). SCORE enables the generation of design cards (DCs). A DC includes four main spaces (Boy, 2005): (1) a rationalization space where the various components of the system being designed (SBD) are described in terms of design rationale, integration and requirements; this space includes declarative and procedural descriptions and statements; (2) an activity space where the current version of the SBD is displayed; it includes static and dynamic features; this space enables SBD manipulation; (3) a structure space where the various components and their inter-relations are formally and declaratively described as systems of systems; (4) a function space where the various functions of the SBD are described in terms of procedural knowledge and dynamic processes involved; this space includes qualitative and quantitative physical and cognitive models. The rationalization space is informed using an adapted version of the QOC method (Questions, Options, Criteria), which was tested within the I 2 S-LWR design team. The activity space contains 3D models developed using AutoDesk Inventor, and transferred into the Unity game engine web player in order to facilitate integration within the DC spaces and enable intuitive manipulation of objects in the activity space. Two additional spaces were added: an instant messaging capability that allows design team members (DTMs) to exchange with one another on a DC; and a structured evaluation space. DCs are cooperatively created and refined by DTMs, and synthesized during periodic design meetings, the frequency of which may vary. Incrementally combining abstract explanations of designed elements and integration with their explicit visual representation improves mutual understanding among DTMs, and

  19. Collaborative Learning in Architectural Education: Benefits of Combining Conventional Studio, Virtual Design Studio and Live Projects

    Science.gov (United States)

    Rodriguez, Carolina; Hudson, Roland; Niblock, Chantelle

    2018-01-01

    Combinations of Conventional Studio and Virtual Design Studio (VDS) have created valuable learning environments that take advantage of different instruments of communication and interaction. However, past experiences have reported limitations in regards to student engagement and motivation, especially when the studio projects encourage abstraction…

  20. Assessment in the Context of Mathematics Instruction Reform: The Design of Assessment in the QUASAR Project.

    Science.gov (United States)

    Silver, Edward A.; Lane, Suzanne

    Recent reports on mathematics education reform have focused the attention of educational practitioners and policymakers on new goals for mathematics education and new descriptions of mathematical proficiency. QUASAR is a national project (Quantitative Understanding: Amplifying Student Achievement and Reasoning) designed to improve the mathematics…