WorldWideScience

Sample records for island hydroelectric projects

  1. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Science.gov (United States)

    2012-07-17

    ...-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a... licenses for the proposed Uniontown Hydroelectric Project and Newburgh Hydroelectric Project. The...

  2. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  3. Hydroelectric project at Angliers : Investigation and public hearing report

    International Nuclear Information System (INIS)

    Girard, S.; Bouchard, B.

    2003-08-01

    Public hearings were held by the Bureau d'audiences publiques sur l'environnement concerning a proposed hydroelectric development project at Angliers, Quebec. The proposed hydroelectric plant is to be located at the outlet of the Des Quinze reservoir in the Temiscamingue region (northwest of the province). The site is within the municipality of Angliers, approximately 130 kilometres south of Rouyn-Noranda. The project will exploit the hydroelectric potential of the Ottawa River through a dam at Des Quinze reservoir, which is currently the property of the federal government. During the hearings, several issues were raised, and various topics examined. The political and administrative framework was reviewed, as well as the integration of the project within the community. The impacts, environmental as well as economic, were discussed. After careful examination of all the information, the Commission concluded that the hydroelectric project at Angliers was justified and acceptable from an environmental perspective. The expected economic impact on the community was an essential aspect in determining if the project was acceptable. refs., 4 figs

  4. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  5. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  6. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  7. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  8. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  9. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  10. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  11. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-01-05

    ... Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of... Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location...

  12. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  13. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  14. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  15. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  16. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  17. Indian areas threatened by hydroelectric projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Aspelin, P L; Santos, S.C. dos

    1981-10-01

    In Brazil, as elsewhere, high priority is being given to developing domestic energy sources due to the spectacular increase in the cost of imported petroleum in recent years. This paper discusses the present situation of the thirty-two to thirty-four various Indian areas presently known to be threatened by seven major hydro-electric projects and one flood-control project, either planned or underway, in or directly involving Brazil. A total of at least 100,000 hectares of Indian land (or nearly one hectare for each remaining Brazilian Indian) will be flooded or otherwise expropriated by these projects. Past efforts by the Brazilian National Indian Foundation (FUNAI) to protect the Indians from the pressure of ''national development'' have not been sufficient. Research, planning, publicity, and political pressure are necessary to ensure that their efforts regarding these hydroelectric projects are more successful.

  18. Instream flow needs below peaking hydroelectric projects

    International Nuclear Information System (INIS)

    Milhous, R.T.

    1991-01-01

    This paper reports on a method developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly change streamflow over a short period of time; consequently, any instream flow methodology must consider the dual flows associated with peaking projects. The dual flows are the lowest flow and the maximum generation flow of a peaking cycle. The methodology is based on elements of the Physical Habitat Simulation System of the U.S. Fish and Wildlife Service and uses habitat, rather than fish numbers or biomas, as at basic response variable. All aquatic animals are subject to the rapid changes in streamflow which cause rapid swings in habitat quality. Some aquatic organisms are relatively fixed in location in the stream while others can move when flows change. The habitat available from a project operated in peaking mode is considered to be the minimum habitat occurring during a cycle of habitat change. The methodology takes in to consideration that some aquatic animals can move and others cannot move during a peaking cycle

  19. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  20. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  1. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  2. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  3. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  4. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  5. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  6. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  7. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  8. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  9. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation of Teleconference On March 15... Mountain Pumped Storage Hydroelectric Project. This meeting has been cancelled. We will reschedule this...

  10. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... Floodplain Statement of Findings for the Cushman Hydroelectric Project, Mason County, Washington... Project in Mason County, Washington. These components include a new 3.6 megawatt (MW) powerhouse on the... components of the Cushman Hydroelectric Project in Mason County, Washington. These components include a new 3...

  11. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  12. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  13. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  14. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...

  15. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby...

  16. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and...

  17. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  18. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Directory of Open Access Journals (Sweden)

    Maíra Benchimol

    Full Text Available Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  19. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Science.gov (United States)

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  20. Attracting finance for hydroelectric power

    International Nuclear Information System (INIS)

    Besant-Jones, John

    1996-01-01

    Hydroelectricity will continue to be important for meeting power requirements in developing countries. Much of the funding required for hydroelectric projects must come from non-government source; hydroelectric projects will therefore need to be attractive to private investors. This note explores the risks investors face, how this can be mitigated, and how the World Bank group can offer advice (as well as finance) to member countries to facilitate investment in hydro electric projects. 3 refs., 1 fig

  1. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  2. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  3. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  4. Turning to account the implicit side effects of hydroelectric projects implying reservoirs

    International Nuclear Information System (INIS)

    Ionescu, S.

    1996-01-01

    Operation of the hydroelectric projects including relatively important water reservoirs provides implicitly side effects favorable to water management (increase of minimum provided flows, flood routing, etc) and to related fields (additional facilities for water supply, extension of the public utility networks as: road, telecommunication, electric lines, favoring the tourism and recreative activities). The paper suggests methodologies for economic and financial assessment of these effects, the turning to account of which, may increase the efficiency of the hydroelectric development and may stimulate the interest for new investments in the field.(author). 3 figs., 5 refs

  5. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  6. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  7. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  8. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  9. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  10. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  11. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY [OE Docket No. PP-387] Application for Presidential Permit; Soule River Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery...

  12. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  13. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  14. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  15. Landscape analyses of representativeness in the Serra de Mesa hydroelectric reservoir, Brazil

    International Nuclear Information System (INIS)

    Cavalcanti, R. B; Meneses, P. R.; Ahern, F. J.

    1997-01-01

    A lake of some 1784 sq km, consisting mostly of savanna vegetation, riverine forest, tropical dry forest and agricultural land, will be created by the construction of the Serra de Mesa hydroelectric reservoir in central Brazil. The lake will contain about 300 islands of various sizes. RADARSAT imagery and LANDSAT TM data is being used to analyze and assess the representativeness of the island and lake edge habitats in relation to the original mix of habitats prior to the flooding. The LANDSAT TM data will provide complementarity, with RADARSAT coverage showing the relief and TM coverage documenting the vegetation classes. In the next phase of the project field data on the biological communities of the islands will be correlated with the landscape classification by remote sensing

  16. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  17. Environment and hydroelectricity colloquium - Synthesis

    International Nuclear Information System (INIS)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-01

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  18. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  19. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  20. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  1. Foundation Investigation for Ground Based Radar Project-Kwajalein Island, Marshall Islands

    Science.gov (United States)

    1990-04-01

    iL_ COPY MISCELLANEOUS PAPER GL-90-5 i iFOUNDATION INVESTIGATION FOR GROUND BASED RADAR PROJECT--KWAJALEIN ISLAND, MARSHALL ISLANDS by Donald E...C!assification) Foundatioa Investigation for Ground Based Radar Project -- Kwajalein Island, Marshall Islands 12. PERSONAL AUTHOR(S) Yule, Donald E...investigation for the Ground Based Radar Project -- Kwajalein Island, Marshall Islands , are presented.- eophysical tests comprised of surface refrac- tion

  2. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    Science.gov (United States)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  3. 75 FR 9201 - Kilarc-Cow Creek Hydroelectric Project; Notice of Intention To Prepare an Environmental Impact...

    Science.gov (United States)

    2010-03-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 606-027-CA] Kilarc-Cow... of license for the Kilarc-Cow Creek Hydroelectric Project, FERC No. 606. The project contains two developments and is located on Old Cow Creek and South Cow Creek in Shasta County, northern California. In the...

  4. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  5. Strenner Canyon project owes much to Lester Pelton. [Use of Pelton turbine in hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, C.

    1985-09-01

    The development of the Stenner Canyon Hydroelectric Project involving 14 miles of pipeline in the hills of California and using the Pelton turbine originally designed in 1883 is described. The city of San Luis Obispo generates dollar 300,000 in revenues by selling the power produced. Four million kWh per annum is fed into the local grid which is sufficient to service about 750 householders for the entire year. (U.K.).

  6. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  7. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  8. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  9. Benefits of fish passage and protection measures at hydroelectric projects

    International Nuclear Information System (INIS)

    Cada, G.F.; Jones, D.W.

    1993-01-01

    The US Department of Energy's Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations

  10. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  11. Deer Island Aquatic Ecosystem Restoration Project

    Science.gov (United States)

    2015-07-01

    across the U.S. Army Corps of Engineers (USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic...USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic Ecosystem Restoration Project (Deer Island AERP...Mississippi Wetlands Restoration Projects). The project received additional funding through several public laws in response to hurricane damages

  12. 75 FR 4058 - CRD Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-01-26

    ... Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: CRD Hydroelectric, LLC. e. Name of Project: Red Rock Hydroelectric Project. f. Location: On the...

  13. 76 FR 62802 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-10-11

    ... Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National...,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch Potomac River in..., Washington, DC 20426. Please affix ``Jennings Randolph Hydroelectric Project No. 12715-003'' to all comments...

  14. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-08-03

    ... Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment In accordance with the... for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the Pound..., NE., Room 1-A, Washington, DC 20426. Please affix ``Flannagan Hydroelectric Project No. 12740-003...

  15. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  16. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  17. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  18. 78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...

  19. Baseline greenhouse gas emissions for the lower Churchill hydroelectric generation project in Labrador

    International Nuclear Information System (INIS)

    LeDrew, L.; Bastien, J.; Tremblay, A.

    2007-01-01

    Newfoundland and Labrador Hydro has proposed to develop the hydroelectric potential of the lower Churchill River by constructing generating facilities at Gull Island and Muskrat Falls. This paper presented the results of a study that was conducted to collect baseline data on greenhouse gas (GHG) fluxes/emissions of carbon dioxide (CO 2 ), methane (CH 4 ) and nitrous oxide (N 2 O) from the lower Churchill River, Smallwood reservoir, and natural lakes in the upper and lower Churchill regions. The purpose of the study was to compare GHG fluxes between the lower Churchill River, Smallwood reservoir and those of the nearby natural lakes and to compare GHG fluxes between the Smallwood reservoir and those of boreal reservoirs in northern Quebec. The paper provided a description of the site and the methodology for GHG flux measurement. The results and discussion focused on physical-chemical variables and GHG fluxes. The study results were to be used in the environmental assessment of the project. It was concluded that the lower Churchill River has higher CO 2 fluxes and lower CH 4 fluxes than the Smallwood reservoir and higher CO 2 fluxes than natural lakes in the region. There was no significant difference in N 2 O fluxes between the sampled waterbodies. Both CO 2 and CH 4 fluxes from the lower Churchill River were comparable to other Canadian reservoirs. 12 refs., 2 tabs., 6 figs

  20. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-10-15

    ... Hydroelectric Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  1. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-03-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, April 15, 2011 at 9 a.m. (Pacific Time). b. Place: By copy of this notice we are inviting all...

  2. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-04-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, May 6, 2011 at 1 p.m. (Pacific Time). b. Place: By copy of this notice we are inviting all...

  3. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  4. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  5. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  6. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  7. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  8. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  9. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  10. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  11. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-01-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12576-004] CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment December 23, 2010. In accordance... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No...

  12. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  13. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  14. 77 FR 47058 - Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft...

    Science.gov (United States)

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-2079-069--CA] Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft Environmental Impact Statement; Public Meetings a. Date and Time of Meetings: Tuesday, August 28, 2012, from 9:00 a.m. to 11:00 a.m. and...

  15. The hydroelectric power plant as a project of private investment; La central hidroelectrica como proyecto de inversion privada

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Eduardo [Industrias Metalurgicas Pescarmona S.A. (IMPSA), Mendoza (Argentina)]. E-mail: guerra@impsa.com.ar

    2001-07-01

    The paper describes the process to be followed for the performance, construction and operation of a hydroelectric investment from the view point of a private investor. The paper demonstrates that it is possible to finance the project through the 'project finance', where the finance has as guarantee the own assets and the fund fluxes of the investment.

  16. Hydropower in Hawaii: Developing the Wailuku River project

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  17. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  18. Private sector financing of projects - implementation of the BAKUN hydroelectric project in Malaysia; Private Projektfinanzierung - Errichtung der Wasserkraftanlage Bakun in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Failer, E. [Lahmeyer International GmbH, Frankfurt am Main (Germany)

    1998-07-01

    The BAKUN Hydroelectric Power Project in Malaysia represents, alongside the Three Gorges Project in China, one of today's most closely observed hydropower projects. The Bakun Project features a generating capacity of 2 520 MW, a 205 m high concrete face rockfill dam and a 1 320 km long power transmission system from Sarawak (Borneo) to West Malaysia. Implementation costs are estimated at around DM 10 000 million. In December 1996 the concession to construct and operate the Bakun Project for a period of 30 years on a BOT (build-operate-transfer) basis was granted to the Bakun Hydro-Electric Corporation, a private project development company. A US-Dollar million contract was awarded one year prior to this concession, to construct the river diversion works in advance. Completion of the three concrete-lined diversion tunnels, each with an inner diameter of 12 m, is scheduled for the end of 1998. After a brief overview of the Bakun Project, the paper describes a typical structure of the parties involved and the legal framework for BOT project finance. The most important features of the concession agreement, the power purchase agreement (PPA) and the engineering, procurement and construction (EPC) contract are explained. Finally, the paper emphasizes that in future the water resources engineer will have to be more involved with topics such as fixed-price contracts, risk management, turnkey solutions and project finance. (orig.) [German] Mit einer geplanten installierten Leistung von 2 520 MW, einem 205 m hohen Steinschuettdamm mit Betonoberflaechendichtung, einem 1 320 km langen Energieuebertragungssystem von Sarawak (Borneo) nach Westmalaysia und mit Projektkosten von ca. 10 Mrd. DM stellt das BAKUN-Wasserprojekt in Malaysia, neben dem Dreischluchtenprojekt in China, eines der meist beachteten Wasserkraftprojekte der Gegenwart dar. Im Dezember 1996 erhielt die private Projektentwicklungsgesellschaft 'Bakun Hydro-Electric Corporation' die Konzession, das

  19. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  20. 75 FR 37790 - Mahoning Creek Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental...

    Science.gov (United States)

    2010-06-30

    ... Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental Assessment for the Proposed Mahoning Creek Hydroelectric Project June 23, 2010. On March 23, 2010, Commission staff issued an Environmental Assessment (EA) for the proposed Mahoning Creek Hydroelectric Project. On April 22, 2010, the U.S...

  1. Management Strategy for Hydroelectric Project Toro 2: Knowing and enhancing natural resources sustainably

    Directory of Open Access Journals (Sweden)

    José Pereira Chaves

    2014-01-01

    Full Text Available The aim of this article is to understand and sustainably enhance the biological and ecological resources of the Hydroelectric Project of Toro 2, thus; a research was carried out to inventory the presence of birds, mammals and plants, in order to know if the site qualifies as a biological tourist attraction, as well as to know the opinion of local people. It is proposed the sustainable uses of natural resources, through a strategy of use, management and conservation of the ecosystems.

  2. 75 FR 38800 - Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis...

    Science.gov (United States)

    2010-07-06

    ... Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting... following hydroelectric application has been filed with the Commission and is available for public... 13, 2009. d. Applicant: Jordan Hydroelectric Limited Partnership. e. Name of Project: Flannagan...

  3. 75 FR 66077 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12555-004-PA] Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental Assessment... Energy Projects has reviewed the application for an original license for the Mahoning Creek Hydroelectric...

  4. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions May 26, 2010. Take notice that the following hydroelectric application and applicant-prepared..., 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  5. Costa Rica: Hydroelectric utility Energía Global finances upstream reforestation

    OpenAIRE

    Energía Global (Global Energy S.A.); The National Forest Office; National Fund for Forest Financing (FONAFIFO)

    2006-01-01

    Metadata only record The goal of Energía Global is to increase both the stream flow and decrease sedimentation in the hydroelectric reservoirs. They are attempting to do this by reforestation projects as well as forest conservation. The sources of revenue for this project are from the private hydroelectric company and the government through taxes on fossil fuels. PES-1 (Payments for Environmental Services Associate Award)

  6. 76 FR 71967 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12740-003-VA] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... application for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the...

  7. 75 FR 15705 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2010-03-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12555-004-PA] Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment March 23, 2010. In... reviewed the application for an original license for the Mahoning Creek Hydroelectric Project, to be...

  8. 77 FR 26537 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment In accordance with the... the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch...

  9. 76 FR 70437 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... original license for the 3.7-megawatt (MW) Gathright Hydroelectric Project located on the Jackson River in...

  10. Environment and hydroelectricity colloquium - Synthesis; Colloque Environnement et Hydro-electricite - Synthese

    Energy Technology Data Exchange (ETDEWEB)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-15

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  11. 75 FR 6371 - Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-09

    ... Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests February 2, 2010. Take notice that the following hydroelectric application has been filed... License b. Project No.: P-12740-003 c. Date filed: July 13, 2009 d. Applicant: Jordan Hydroelectric...

  12. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-06-08

    ... Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Date Filed: March 21, 2012. d. Submitted By: BOST1 Hydroelectric LLC (BOST1). e. Name of Project: Coon Rapids Dam Hydroelectric Project. f. Location: Mississippi River in Hennepin and Anoka counties...

  13. Fuzzy logic approach for energetic and economic evaluation of hydroelectric projects

    International Nuclear Information System (INIS)

    Iliev, Atanas M.

    2003-01-01

    A mathematical model for energetic and economic evaluation of hydroelectric projects is developed. The main advantage of the proposed methodology is that the model considers uncertainty and vagueness which appears during the decision making process. Due to modeling of variables that are non statistical in their character, fuzzy logic approach is fully incorporated in the model. The first step in energetic evaluation of the hydro power projects is determination of the characteristic of the efficiency of the units to be installed in hydro power plants. For this purpose the model which uses the best characteristics of Artificial Network Fuzzy Inference System (ANFIS) is applied. The method is tested on real systems: HPP Tikves- the power plant in operation and HPP Kozjak - the power plant in construction. The results obtained from practical implementation show that the proposed approach gives superior results than classical polynomial approximation. The model for determining the consumption characteristic of hydro power plant is developed by Sugeno Fuzzy Logic System with polynomials in the consequent part of the rules. Model takes into account the variable gross head of HPP, as well as, the number of units which will be in operation for given output. Modeling of the gross head and power output are performed by expert's design membership functions. This model is practically applied on HPP Tikves for determination of the consumption characteristic for several gross head. The plausible yearly production of electricity from hydro power project, which is important for estimation of the benefit from the project, is calculated by mixed fuzzy-statistical model. hi this approach fuzzy set of the inflow is constructed according to the statistical parameters. The calculation of the production of electricity is realized for a several hydrological conditions which are described by linguistic variables. Finally, Mamdani Fuzzy Inference System with fuzzy number in consequent part

  14. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  15. Amplification of Marzagao small scale hydroelectric power plant; Ampliacao da PCH de Marzagao

    Energy Technology Data Exchange (ETDEWEB)

    Zeller, A.R.; Porto, D.S.; Pinto, F.S. [Leme Engenharia, MG (Brazil); Melo, A.U.; Almeida, A.M.; Pereira, D.R. [Fertiligas Industria e Comercio Ltda., MG (Brazil)

    1991-12-31

    This work presents the modernization and power augmentation of Marzagao small scale hydroelectric power plant. In order that the costs of the project be compatible to the total of investments in the project, it was necessary the adoption of methodologies and time scales different from those used for large and medium scale hydroelectric power plants 5 figs.

  16. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003 Montana] Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  17. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  18. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  19. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... Project, FERC No. 9403. All correspondence should be forwarded to Rivermill Hydroelectric, Inc., c/o Essex...

  20. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  1. Externality costing for hydroelectric projects: Is it desirable? Is it possible?

    International Nuclear Information System (INIS)

    Bernier, L.

    1992-01-01

    The assignment of monetary values to environmental and social impacts of hydroelectric projects is discussed. The strengths and weaknesses of the economic approach to externality costing are noted. The problem to be faced is that environmental externalities associated with a hydro project very often involve resources that have little or no relation with the market, such as disturbances of land not used for commercial activities. The valuation of externalities related to thermal power plants is examined to provide lessons for quantifying the externalities of hydro projects. One observation is that there is very little information on the real impacts of such phenomena as the release of greenhouse gases, making quantification of their effect difficult; another is that impacts from atmospheric emissions are well in excess of simple deterioration of material goods or recreational activities that have some relationship to the market. Applied to hydro projects, the lessons from these observations indicate that there are no exact and homogeneous measurement units for impacts of actions such as diking or alteration of wildlife habitats. One approach that has been tried is the contingent valuation method, which relies on asking respondents how much they would pay to avoid an impact or risk. This approach is criticized and it is suggested to experiment with a review of the tradeoffs between several possible environmental impacts defined in a precise manner

  2. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13824-000, 13826-000] FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary Permit... Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC, Project No. 13824-000. Dated: February 22...

  3. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  4. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  5. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Science.gov (United States)

    2010-08-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...

  6. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  7. Valuation of the environmental impacts of the Kayraktepe dam/hydroelectric project, Turkey: An exercise in contingent valuation

    International Nuclear Information System (INIS)

    Biro, Y.E.K.

    1998-01-01

    This paper describes and evaluates the environmental impacts of the Kayraktepe Dam and Hydroelectric Power Plant in Turkey. The contingent valuation method is used to estimate the project's local environmental costs. The average local rural annual willingness to pay for the restoration of the environmental impacts of the project is found to be USD 300 person -1 . Loss of forestry and agricultural benefits from the reservoir area that will be inundated are estimated to be USD 12.66 mill. yr -1 . When the Kayraktepe Project's external costs are internalized, its benefit cost ratio falls from 1.35 to 0.84, indicating that the project is economically undesirable and the decision for its construction needs to be reconsidered 26 refs, 1 fig, 5 tabs

  8. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast

    International Nuclear Information System (INIS)

    Arrieta, R.M.; Insignares R, G.

    1987-01-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country

  9. Environmental analysis report for the hydroelectric project on the Sheldrake River in the Courbe du Sault section in the municipality of Riviere-au-Tonnerre by the Societe d'energie riviere Sheldrake Inc

    International Nuclear Information System (INIS)

    Michaud, A.; Paul, M.; Brunet, G.

    2010-01-01

    The Societe d'energie riviere Sheldrake Inc. (SERS Inc.) is planning to exploit the hydroelectric potential of the Sheldrake River in the Quebec municipality of Riviere au Tonnere. The proposed project will involve building a hydroelectric power station with a maximum capacity of 25 MW on the Sheldrake River, in the Courbe du Sault section. The project will also comprise a dam, a water reservoir and an overflow spillway. The project meets the province's 2006-2015 energy strategy to develop small-scale hydroelectric facilities. The project was subject to an environmental assessment as required by the province of Quebec. This environmental analysis addressed the major challenges facing the hydroelectric development at the Courbe du Sault section of the River, notably the impact on fish habitat, wetlands and the local and regional economic benefits. The environmental assessment did not indicate any habitat destruction for trout or salmon in the forebay. The Quebec Ministry of Sustainable Development, Environment and Parks has deemed the project to be acceptable given that certain conditions are met, including thresholds to stabilize the water level and the construction of a downstream fish passage facility to allow for safe fish migration. 22 refs., 2 tabs., 5 figs., 3 appendices.

  10. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-04-27

    ... Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests April 20, 2010. Take notice that the following hydroelectric application has been filed with the.... Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...

  11. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  12. Environmental consequences of hydroelectric development: the role of facility size and type

    International Nuclear Information System (INIS)

    Gleick, P.H.

    1992-01-01

    The development of hydroelectric power throughout the world is receiving renewed attention as the economic, political, and environmental costs of conventional energy production rise. There is currently a perception that hydroelectricity has environmental and economic advantages over electricity produced by conventional energy technologies, but there is a paucity of information about the environmental impacts of hydroelectric facilities as a function of size and type. We characterize the environmental impacts of hydroelectric developments and quantify these impacts as a function of the size and type of project. Several unexpected conclusions arise from our analysis. For most hydroelectric facilities, size, as measured by installed capacity, is not necessarily a good indicator or the severity of environmental costs. For impacts such as land flooded and evaporative water lost, smaller facilities cause greater environmental disruptions per unit of energy produced than do larger facilities. (Author)

  13. The pacific island health care project.

    Science.gov (United States)

    Person, Donald Ames

    2014-01-01

    US Associated/Affiliated Pacific Islands (USAPI) include three freely associated states: Marshall Islands, Federated States of Micronesia, Palau, and three Territories: American Samoa, Guam, and Commonwealth of the Northern Mariana Islands. The Pacific Island Health Care Project (PIHCP) provides humanitarian medical referral/consultation/care to >500,000 indigenous people of these remote islands. In the mid-1990s, we developed a simple store-and-forward program to link the USAPI with Tripler Army Medical Center. This application allowed image attachment to email consultations. More than 8000 Pacific Islanders have benefited from the program. Three thousand Pacific Islanders prior to telemedicine (1990-1997) and since store-and-forward telemedicine (1997-present), the PIHCP has helped an additional 5000. Records post dynamically and are stored in an archival database. The PIHCP is the longest running telemedicine program in the world delivering humanitarian medical care. It has bridged the Developing World of the remote Pacific Islands with advanced medical and surgical care available at a major US military teaching hospital. (The opinions expressed here are those of the author and not that of the Army, Department of Defense, or the US Government.).

  14. The Pacific Island Health Care Project

    Directory of Open Access Journals (Sweden)

    Donald Ames Person

    2014-10-01

    Full Text Available Introduction/BackgroundUS Associated/Affiliated Pacific Islands (USAPI include 3 Freely Associated States: Marshall Islands, Federated States of Micronesia, Palau and 3 Territories: American Samoa, Guam, and Commonwealth of the Northern Mariana Islands. ObjectiveThe Pacific Island Health Care Project (PIHCP provides humanitarian medical referral/consultation/care to >500,000 indigenous people of these remote islands. Methods In the mid-1990s, we developed a simple store-and-forward program to link the USAPI with Tripler Army Medical Center (TAMC. This application allowed image attachment to email consultations. ResultsMore than 8000 Pacific Islanders have benefited from the program. 3000 Pacific Islanders prior to telemedicine (1990-1997 and since store-and-forward telemedicine (1997-present, the PIHCP has helped an additional 5000. Records post dynamically and are stored in an archival database. Conclusion The PIHCP is the longest running telemedicine program in the world delivering humanitarian medical care. It has bridged the Developing World of the remote Pacific islands with advanced medical and surgical care available at a major US military teaching hospital.(The opinions expressed here are those of the author and not that of the Army, Department of Defense, or the US Government.

  15. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  16. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  17. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  18. New erection program of the hydroelectric power plant Beznau. Das Neubauprojekt des hydraulischen Kraftwerkes Beznau

    Energy Technology Data Exchange (ETDEWEB)

    Bretscher, B; Hauenstein, W [NOK Nordostschweizerische Kraftwerke AG, Baden (Switzerland)

    1992-02-21

    The projected hydroelectric power plant at Beznau on the Aare river will produce about 43% more electric power than the present hydroelectric power plant. The water level and the buildings in the Aare will remain unchanged, so that the enviromental impact will be relativley slight. The project is in accordance with the building permit so that no adaptations on modifications will be required. (orig.).

  19. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  20. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  1. assessment of slope stability around gilgel gibe-ii hydroelectric

    African Journals Online (AJOL)

    preferred customer

    1 Gilgel-Gibe II Hydroelectric Project, Fofa Town, Ethiopia ... Key words/phrases: Factor of safety, plane failure, slope design, slope .... condition of potential unstable slopes along the road between Fofa town and Gilgel-Gibe Hydro- power II.

  2. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  3. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  4. 77 FR 15094 - Sawatt Hydroelectric, LLC; Notice of Application for Amendment of Exemption and Soliciting...

    Science.gov (United States)

    2012-03-14

    ... Project: Mechanicsville Hydroelectric Project. f. Location: The project is located on French River, near... and contact information at the end of comments. The Commission strongly encourages electronic filings...

  5. What are the stakes of the hydroelectric power? Supplement: report on the renewable energies

    International Nuclear Information System (INIS)

    2003-01-01

    The document presents the regulation and the stakes concerning the hydroelectricity development in France: contribution to the greenhouse effect fight, the environment preservation, possible uses. It proposes then, a grid of a socio-economical evaluation of the projects. In this framework, the impacts of the little hydroelectric power and the possible corrective measures are described. (A.L.B.)

  6. 76 FR 45249 - Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting

    Science.gov (United States)

    2011-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting On August 5, 2011, Office of Energy Projects staff may participate in a public meeting hosted by the U.S. Army Corps of Engineers, Baltimore District (Corps) for the...

  7. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-11-20

    ... Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,\\1\\ has been transferred to Troy Mills...

  8. Hydroelectric construction project on the Sheldrake River at Riviere-au-Tonnerre : public inquiry report

    International Nuclear Information System (INIS)

    2009-09-01

    The Societe d'Energie Riviere Sheldrake Inc. has proposed the construction of a hydroelectric facility on the Sheldrake River at Riviere-au-Tonnerre in the regional municipality of Minganie in Quebec. The project involves the construction of a headrace canal, intake, tunnel, powerhouse, access roads, electrical transmission line, spillway, weir and a bridge over the Sheldrake River. The proposed development was subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. The primary concerns were the economic repercussions of the project and its effect on tourism and fish, including salmon. The Board determined that the project would create jobs in a region affected by unemployment and the decay of its municipalities and that it would stimulate the local and regional economy. However, the Board determined that changes to the project are required to minimize impacts on the natural environment. The project proponent must monitor instream flows to ensure that fish passage facilities meet regulations. In addition, since the proposed project crosses 3 bogs, the developer must compensate for lost wetlands. A 10-year follow-up is required to assess the recovery of these environments. The developer must also maintain the aesthetic quality of the Courbe du Sault Falls in order to maintain the eco-tourism in the region. refs., figs.

  9. Sound cable crossing brings inexpensive electric power to Long Island

    International Nuclear Information System (INIS)

    Grzan, J.; Goyette, R.

    1992-01-01

    This paper reports that while many electric-utility customers in New York State benefit from inexpensive hydroelectric power from Canada and upstate New York, lack of sufficient transmission connections have prevented this electricity from reaching Long Island. However, a newly constructed underground/underwater link capable of carrying 700-MW now transmits low-cost electricity to the island, saving money for customers. The self-contained fluid-filled cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of temperature monitoring and leak detection systems, SF 6 gas-insulated substation, and underwater cable laying and embedment techniques

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  11. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  12. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  13. 78 FR 64002 - South Farallon Islands Invasive House Mouse Eradication Project; Farallon National Wildlife...

    Science.gov (United States)

    2013-10-25

    ...-FF08RSFC00] South Farallon Islands Invasive House Mouse Eradication Project; Farallon National Wildlife... Statement (revised DEIS) for the South Farallon Islands Invasive House Mouse Eradication Project on the... non-native invasive house mice from the South Farallon Islands, part of the Farallon National Wildlife...

  14. Fish screens at hydroelectric diversions

    International Nuclear Information System (INIS)

    Ott, R.F.

    1994-01-01

    Preventing downstream migrating fish from entering the turbines at hydroelectric projects is a standard mitigation goal of state and federal fishery management agencies. The object is to minimize the adverse impacts to the fish associated with the exclusion and passage through the bypass water conveyance facilities. In the western United States, most of the fishery management agencies have fish screen design criteria that focus on the approach and transportational velocities, maximum opening dimensions of the screen material, and the cleaning standards. Recently, more attention has been given to fish behavioral traits such as attraction and sustained and darting swimming speed, which has resulted in more attention to the position of the screens to the flow and the length of time the downstream migrants are exposed to the screens. Criteria for length of time of exposure, size and position of bypass, flow and velocities in the bypass entrances, discharge requirements back into the receiving water, and exposure to predation have created unique challenges to the fish screen designer. This paper discusses some of the more recent types of fixed fish screens that are being installed at hydroelectric plants that meet these challenges

  15. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  16. Engineering IT-enabled sustainable electricity services the tale of two low-cost green Azores Islands

    CERN Document Server

    Xie, Le; Liu, Qixing

    2013-01-01

    Engineering IT-Enabled Electricity Services: The Tale of Two Low-Cost Green Azores Islands covers sustainable energy services to customers - a balanced choice and coordination of energy generated by traditional and alternative sources. The “Green Islands” project represents a decade of work by over a dozen researchers who have developed a model designed to utilize the potential of distributed clean resources. The key is the proper use of Information Technology (IT).  Sited on two islands in the Azores, the project developed the model of careful forecasting of demand and supply, down to the minute, coordinating the output of conventional power plants, wind energy, fly wheels, hydroelectricity, demand reduction, and even plug-in electric vehicles to take full advantage of the clean resources available. This contributed volume presents methods for predicting variable resources, such as wind power generation, and analyzes the achievable accuracy of these predictions. Throughout this book, contributors sho...

  17. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  18. Dauphin Island natural gas project

    Energy Technology Data Exchange (ETDEWEB)

    Layfield, R.P. (Arco International Oil and Gas Co., Plano, TX (United States)); Elser, K.L.; Ostler, R.H. (Arco Oil and Gas Co., Houston, TX (United States))

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards.

  19. Dauphin Island natural gas project

    International Nuclear Information System (INIS)

    Layfield, R.P.; Elser, K.L.; Ostler, R.H.

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards

  20. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were

  1. Hydroelectricity, an opportunity to grab?

    International Nuclear Information System (INIS)

    Yergeau, M.

    1997-01-01

    The deregulation within the electricity sector and the government''s project approval process were discussed. Deregulation was meant to simplify trade while providing consumers with a fair price, quality service and end-product quality. Proposals for large hydroelectric projects, however, must still be authorized by the government. The environmental assessment process for projects involving energy transmission infrastructures is long and complicated. All of Hydro-Quebec''s recent large projects were challenged in court. While energy market players need environmentally credible generating schemes, there appears to be nothing on the horizon to suggest that the approval process is going to be made easier soon. Indeed, there is every reason to believe that recent gains in environmental and social protection will not be sold off to ease the burden on utility companies to prove their case before construction. The choice is between speed and quality in matters of authorization, and while every effort should be made to combine the two, when it comes down to a choice, there should be no question as to what must be preserved. 2 figs

  2. Improve services project -- Republic of the Marshall Islands.

    Science.gov (United States)

    Langidrik, J

    1995-01-01

    The Republic of the Marshall Islands has 60 dispensary sites, each staffed by 1 health assistant, to cover 80-800 people/site on 34 atolls. Until the spring of 1994, only curative services were available on a regular basis, and preventive services were provided by traveling health teams from the urban centers. In 1994, the health assistants in selected outer islands were trained to administer immunizations from vaccines which are sent regularly by air. Additional project sites are being selected. In 1993, 2 dispensaries initiated a project to 1) increase the number of women with access to prenatal care during the first trimester, 2) increase immunization levels, 3) improve access to preventive services, and 4) improve reporting and record-keeping systems. This project includes an important training component for the health assistant, the wife of the health assistant, the traditional birth attendant, the youth peer educator, community leaders, and a member of the local council. By 1994, this project was expanded to 13 dispensaries on 2 atolls. In 1995, 18 more dispensaries on 4 more atolls will be able to offer these additional services.

  3. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  4. Hydroelectricity at the crossroad: let us give a new momentum to the first renewable energy. White paper on hydroelectricity

    International Nuclear Information System (INIS)

    2017-01-01

    This publication first indicates some data which illustrate the role, importance and development perspectives of hydroelectricity in terms of energy production and in terms of jobs. It outlines that, due to its high adaptation capacity and flexibility, hydroelectricity is an important factor for territory development, that it has a major role in energy supply safety, in the energy mix, and in decentralised energy production. It proposes an overview of the different types of hydroelectric installations: reservoirs for a flexible production and supply safety, run of river hydro systems for a continuous and renewable energy production, pumped storage power stations for mass storage of electric energy. It proposes an overview of assets of hydroelectric energy: implementation of energy transition on the long term, development of an industrial sector of excellence, a responsible and supportive energy, compatibility between hydroelectricity, biodiversity and water usages. Proposals are then formulated to give electricity a new momentum: a new orientation of national and European policies for a better global consistency, a new orientation of economic choices and tax policy as incentives to maintenance and development of the hydroelectric sector, and a fair compensation of services provided to the electric power system

  5. 76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment

    Science.gov (United States)

    2011-03-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of...

  6. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  7. Renewable based hydrogen energy projects in remote and island communities

    International Nuclear Information System (INIS)

    Miles, S.; Gillie, M.

    2009-01-01

    Task 18 working group of the International Energy Agency's Hydrogen Implementing Agreement has been evaluating and documenting experiences with renewable based hydrogen energy projects in remote and island communities in the United Kingdom, Canada, Norway, Iceland, Gran Canaria, Spain and New Zealand. The objective was to examine the lessons learned from existing projects and provide recommendations regarding the effective development of hydrogen systems. In order to accomplish this task, some of the drivers behind the niche markets where hydrogen systems have already been developed, or are in the development stages, were studied in order to determine how these could be expanded and modified to reach new markets. Renewable based hydrogen energy projects for remote and island communities are currently a key niche market. This paper compared various aspects of these projects and discussed the benefits, objectives and barriers facing the development of a hydrogen-based economy

  8. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  9. Structure of a tropical island forest area directly affected by the hydroelectric power station of Pilar, Guaraciaba County, Minas Gerais; Estrutura de uma floresta estacional semidecidual insular em area diretamente afetada pela Usina Hidreletrica de Pilar, Guaraciaba, Zona da Mata de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Meira-Neto, Joao Augusto Alves; Silva, Alexandre Francisco da [Vicosa Univ., MG (Brazil). Dept. de Biologia Vegetal; Souza, Agostinho Lopes de [Vicosa Univ., MG (Brazil). Dept. de Engenharia Florestal; Paula, Alessandro de [Vicosa Univ., MG (Brazil). Curso de Pos-Graduacao em Botanica

    1998-12-31

    Electrical energy consumption in Brazil is increasing and new hydroelectric power stations are required. This work was carried out at a semi deciduous tropical island forest in Guaraciaba, MG to look for composition peculiarities and to provide a structural model which could be applied to reduce environmental damages caused by Pilar HPS. The point-centered quarter method was applied totalizing 50 sample units. Fifty five species were sampled and a Shannon diversity index (H) of 3.429 nats/individual found. The most important species were longiracemosus, Tapirira guianensis, Pera glabrata, Copaifera langsdorffii, Callophyllum brasiliensis and Guapira opposita. The Guaraciaba island forest presented the peculiarity of Podocarpus sellowii occurrence sellowii occurrence, a rare gymnosperm species that does not occur at nearby forests. The Guaraciaba island forest is probably representative of an original alluvial forest at Piranga valley. (author) 14 refs., 1 fig., 1 tab.

  10. 76 FR 76709 - Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12642-003 North Carolina] Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's...

  11. 76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption

    Science.gov (United States)

    2011-08-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12629-003] F&B Wood... the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric... Project No. 12629 on October 24, 2006. F&B Wood Corp.,117 FERC ] 62,059 (2006) \\3\\ See filings of May 9...

  12. Public choice in water resource management: two case studies of the small-scale hydroelectric controversy

    Energy Technology Data Exchange (ETDEWEB)

    Soden, D.L.

    1985-01-01

    Hydroelectric issues have a long history in the Pacific Northwest, and more recently have come to focus on developing environmentally less-obtrusive means of hydroelectric generation. Small-scale hydroelectric represents perhaps the most important of these means of developing new sources of renewable resources to lessen the nation's dependence on foreign sources of energy. Each potential small-scale hydroelectric project, however, manifests a unique history which provides a highly useful opportunity to study the process of collective social choice in the area of new energy uses of water resources. Utilizing the basic concepts of public choice theory, a highly developed and increasingly widely accepted approach in the social sciences, the politicalization of small-scale hydroelectric proposals is analyzed. Through the use of secondary analysis of archival public opinion data collected from residents of the State of Idaho, and through the development of the two case studies - one on the Palouse River in Eastern Washington and the other at Elk Creek Falls in Northern Idaho, the policy relevant behavior and influence of major actors is assessed. Results provide a useful test of the utility of public-choice theory for the study of cases of natural-resources development when public involvement is high.

  13. Mission: Partnerships - A Socially Responsible Approach for New Hydro-electric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Wojczynski, Ed; Cole, Victoria; Pachal, Shawna; Goulet, Richard

    2010-09-15

    Worldwide there is a desire for clean, secure and renewable energy developed in an environmentally and socially responsible manner. In the Canadian province of Manitoba, where water is an abundant resource, efforts are being undertaken by Manitoba Hydro to achieve this goal through the development of new hydro-electric generating stations in partnership with Aboriginal (indigenous) communities. This paper focuses on the lessons learned by Manitoba Hydro in developing and implementing partnership agreements with northern Aboriginal communities on two new generation projects - the Wuskwatim Generation Project and the Keeyask Generation Project.

  14. Ecological review of hydroelectric reservoirs in Puerto Rico

    Energy Technology Data Exchange (ETDEWEB)

    Jobin, W.R.; Ferguson, F.F.; Brown, R.

    1976-10-01

    A review of published literature and available data on the ecology of hydroelectric reservoirs and other lakes in Puerto Rico yielded various studies on unrelated elements in the aquatic ecology, but very few comprehensive investigations. The majority of the island-wide studies pertained to surveys on snails related to the parasitic disease bilharzia. A survey of 28 major lakes in 1976 showed that Biomphalaria glabrata had gradually been displaced from most of the lakes by Marisa cornuarietis and Tarebia granifera, two foreign snails which do not transmit bilharzia. Of the 17 lakes containing B. glabrata in 1956, only 8 remained infested in 1966 and only 5 in 1976, twenty years after the introduction of Marisa cornuarietis. Although the trend indicates that the lakes may be safe from transmission a monitoring system is necessary before the lakes could be used for recreation.

  15. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  16. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  17. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  18. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  19. 78 FR 38028 - Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric...

    Science.gov (United States)

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206-030] Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric Project Biological Opinion On April 29, 2013, the National Marine Fisheries Service (NMFS) of the National Oceanic and...

  20. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  1. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    International Nuclear Information System (INIS)

    Cada, G.F.

    1996-01-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy's Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality

  2. 2015 Plan. Project 4: electric power supply, hydro electrical potential

    International Nuclear Information System (INIS)

    1992-12-01

    This project describes the Brazilian hydroelectric park citing the historical aspects, methodology of potential evaluation, forecasts of costs for hydroelectric use and the utilization of hydroelectric potential in small and reversible hydroelectric plants situated in all Brazilian regions. The utilization of hydroelectric potential in Amazon region is put in relief. 8 figs, 17 tabs

  3. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  4. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  5. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  6. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  7. Which hydroelectric potential in your region?

    International Nuclear Information System (INIS)

    2011-01-01

    Illustrated by photos, maps, figures and graphs, this Power Point presentation outlines the important remaining potential of hydroelectricity in France: 10.6 TWh. It indicates how this potential has been assessed and calculated. Even if possibilities exist everywhere (either by building new dams or by exploiting existing weirs), four regions present a higher potential for new works: Rhone-Alpes, Midi-Pyrenees, Auvergne, and Provence-Alpes-Cote d'Azur. Maps indicate the concerned rivers and locations in some regions. Such projects which could boost economic local, regional and national development must be designed while taking planning tools into account (notably the climate-air-energy regional schemes), and rules related to river preservation

  8. 76 FR 20706 - South Farallon Islands Nonnative Mouse Eradication Project; Farallon National Wildlife Refuge...

    Science.gov (United States)

    2011-04-13

    ... Noonday Rock. In 1969 the Refuge was expanded to include the South Farallon Islands and is still managed... eradicate nonnative mice from the South Farallon Islands, part of the Farallon National Wildlife Refuge off... eradicate nonnative house mice (Mus musculus) from the South Farallon Islands. The purpose of this project...

  9. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  10. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast; Recursos hidroelectricos. Inventario de los recursos hidroelectricos de la Costa Atlantica

    Energy Technology Data Exchange (ETDEWEB)

    Arrieta, R M; Insignares R, G

    1987-07-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country.

  11. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  12. Community-based observations on sustainable development in southern Hudson Bay

    International Nuclear Information System (INIS)

    Arragutainaq, L.; Fleming, B.

    1991-01-01

    Inuit residents of the Belcher Islands in Hudson Bay practice sustainable development over a wide region, and are heavily dependent on fish and wildlife for food. Large-scale hydroelectric developments on rivers emptying into Hudson Bay and James Bay threaten both the environment and the traditional economy and culture of those residents. The main focus of concern is the James Bay hydroelectric project, part 1 of which (La Grande) is now operational. In addition, hydroelectric projects in Manitoba and Ontario may also affect the region. The residents feel that the subdivision of each project into components, each subject to a separate environmental review and assessment, works in favor of the project proponents and does not address the issues of interest to those affected by the project. Neither does such a review process address questions related to the cumulative development of many projects over a long term. The Belcher Islands are remote from the territorial and national governments, neither of which seem to be giving the James Bay developments as much attention as seems necessary. The island community has identified its primary ecological concerns on part 2 of the James Bay project and presented them at a public hearing. These concerns include the long-term impacts of the project on the marine environment and the kinds of compensation, if any, for such impacts. 7 refs., 2 figs

  13. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Bulan, L.C.

    2011-01-01

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: → Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. → The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. → We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  14. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore); Bulan, L.C. [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-09-15

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: > Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. > The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. > We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  15. Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-10-01

    Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

  16. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  17. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  18. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  19. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  20. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  1. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  2. The hydrogen economy urgently needs environmentally sustainable hydroelectricity

    International Nuclear Information System (INIS)

    Goodland, R.

    1995-01-01

    Only two sources of energy were said to have the capacity to bridge the transition to fully sustainable and renewable energy, namely natural gas and hydro. The argument was made that because of this advantage, both forms will have to be promoted fast, since the transition to sustainable energy is urgent. In so far as natural gas supplies are concerned, it was estimated that they will last for perhaps the next 50 years, whereas hydroelectric potential is practically unlimited. Developing nations could vastly accelerate their development, reduce poverty and approach sustainability by exporting hydro to industrial countries. Similarly, industrial nations switching from fossil fuels to hydrogen could move up the environmental ranking, and significantly help alleviating global pollution and climate risks. Environmental ranking of new energy sources, world reservoirs of hydroelectric power, environmental and social ranking of hydro sites, the environmental impacts of hydro projects, and the concept of environmental sustainability in hydro reservoirs, were summarized. Greater acceptance of the need for sustainable development by the hydro industry was urged, along with more care in selecting hydro development sites with sustainability as a prime objective. 23 refs., 6 figs

  3. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  4. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  5. Summary of thirty years of environmental knowledge acquired by Hydro-Quebec in large hydroelectric projects in northern regions; Synthese de trente annees de connaissances environnementales acquises par Hydro-Quebec reliees aux grands amenagements hydroelectriques en milieu nordique

    Energy Technology Data Exchange (ETDEWEB)

    Demers, C. [Hydro-Quebec, Montreal, PQ (Canada)

    2003-12-01

    Power generation in Canada is a provincial responsibility. Since Quebec does not possess petroleum, natural gas or coal deposits, the Quebec government decided, in the 1970s, to develop hydroelectric resources in the northern regions of the province. This paper presents a brief historical overview of the hydroelectric development of the La Grande River project, also referred to as the James Bay project. Located approximately 1000 kilometres north of Montreal, the La Grande project lies in a humid continental climate with an average winter temperature of - 23 Celsius and an average summer temperature of 14 Celsius. The construction of the dam was not preceded by an environmental impact assessment, but environmental data was collected for the first time before construction began. It was an opportunity for all environmental sciences to develop inventory methodologies and analysis techniques specific to northern regions applicable to hydroelectric development. This project also required the signing of the James Bay and Northern Quebec Agreement by the governments of Canada and Quebec, Hydro-Quebec, and the Crees and Inuit of Quebec. The Agreement covers an area of 1 million square kilometres. As a result, Hydro-Quebec has become, over the past 30 years, a leader in environmental assessments and studies in the province. In northern Quebec, a hydroelectric reservoir constitutes an ecosystem whose biological productivity is comparable to a natural lake or ecosystem of equal area. During the first 5 years after flooding, reservoirs possess water quality slightly below that of a natural lake, but still favorable to biological development. The flooding of areas and the subsequent organic degradation promote mercury methylation and its accumulation in the food chain. The emissions of greenhouse gases by northern reservoirs are minimal compared to tropical reservoirs. The fauna in northern Quebec suffered habitat loss, but none became endangered. No Aboriginal community

  6. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  7. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  8. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  9. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  10. Actual state and perspectives of the small hydroelectric plants in Colombia

    International Nuclear Information System (INIS)

    Torres Q, E.; Castillo C, J.J.

    1995-01-01

    In this article, the actual state of the small-scale hydroelectric power plants (PCHs, abbreviations in Spanish) in Colombia in aspects as: Statistic of the water in Colombia, a brief historical review and the characteristics of the PCHs in Colombia, is present. The development PCHs, the executing projects and the actions that has been develop by the INEA (Institute of Nuclear Sciences and the Alternative Energies) is described

  11. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  12. Introduction to the Arizona Sky Island Arthropod Project (ASAP): Systematics, biogeography, ecology, and population genetics of arthropods of the Madrean Sky Islands

    Science.gov (United States)

    Wendy Moore; Wallace M. Meyer; Jeffrey A. Eble; Kimberly Franklin; John F. Wiens; Richard C. Brusca

    2013-01-01

    The Arizona Sky Island Arthropod Project (ASAP) is a new multi-disciplinary research program at the University of Arizona that combines systematics, biogeography, ecology, and population genetics to study origins and patterns of arthropod diversity along elevation gradients and among mountain ranges in the Madrean Sky Island Region. Arthropods represent taxonomically...

  13. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  14. The impact of climate change on hydro-electricity generation

    International Nuclear Information System (INIS)

    Musy, A.; Music, B.; Roy, R.

    2008-01-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs

  15. Air pollution prevention through urban heat island mitigation: An update on the urban heat island pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Gorsevski, V.; Taha, H.; Quattrochi, D.; Luvall, J.

    1998-07-01

    Urban heat islands increase the demand for cooling energy and accelerate the formation of smog. They are created when natural vegetation is replaced by heat-absorbing surfaces such as building roofs and walls, parking lots, and streets. Through the implementation of measures designed to mitigate the urban heat island, communities can decrease their demand for energy and effectively cool the metropolitan landscape. In addition to the economic benefits, using less energy leads to reductions in emission of CO{sub 2}--a greenhouse gas--as well as ozone (smog) precursors such as NOx and VOCs. Because ozone is created when NOx and VOCs photochemically combine with heat and solar radiation, actions taken to lower ambient air temperature can significantly reduce ozone concentrations in certain areas. Measures to reverse the urban heat island include afforestation and the widespread use of highly reflective surfaces. To demonstrate the potential benefits of implementing these measures, EPA has teamed up with NASA and LBNL to initiate a pilot project with three US cities. As part of the pilot, NASA will use remotely-sensed data to quantify surface temperature, albedo, the thermal response number and NDVI vegetation of each city. This information will be used by scientists at Lawrence Berkeley National Laboratory (LBNL) along with other data as inputs to model various scenarios that will help quantify the potential benefits of urban heat island mitigation measures in terms of reduced energy use and pollution. This paper will briefly describe this pilot project and provide an update on the progress to date.

  16. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  17. Progress report for project modeling Arctic barrier island-lagoon system response to projected Arctic warming

    Science.gov (United States)

    Erikson, Li H.; Gibbs, Ann E.; Richmond, Bruce M.; Storlazzi, Curt; B.M. Jones,

    2012-01-01

    Changes in Arctic coastal ecosystems in response to global warming may be some of the most severe on the planet. A better understanding and analysis of the rates at which these changes are expected to occur over the coming decades is crucial in order to delineate high-priority areas that are likely to be affected by climate changes. In this study we investigate the likelihood of changes to habitat-supporting barrier island – lagoon systems in response to projected changes in atmospheric and oceanographic forcing associated with Arctic warming. To better understand the relative importance of processes responsible for the current and future coastal landscape, key parameters related to increasing arctic temperatures are investigated and used to establish boundary conditions for models that simulate barrier island migration and inundation of deltaic deposits and low-lying tundra. The modeling effort investigates the dominance and relative importance of physical processes shaping the modern Arctic coastline as well as decadal responses due to projected conditions out to the year 2100.

  18. Mitigation measures for the La Grande 1 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1992-01-01

    Measures to mitigate environmental impacts of the La Grande 1 hydroelectric development are described. An overview is presented of the La Grande 1 project, its surrounding environment, and the principle environmental repercussions of the reservoir, hydrological changes between the dam and river mouth, construction activities and permanent and temporary structures, and presence of workers. Mitigation measures including compensation, corrective measures (deforestation, selective cutting, fish populations, wildlife populations, land rehabilitation, access roads, fisheries, and erosion control), protective measures, enhancement measures, and contract and employment opportunities for the Cree population are described. 10 refs., 2 figs

  19. Mitigative measures for the Laforge-2 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1995-01-01

    Corrective, preventive and enhancement measures undertaken as part of the development of the Laforge-2 Hydroelectric Power Plant, were described. The environment into which the project has been integrated was also described. General background information and technical characteristics of the Laforge-2 and Caniapiscau-Laforge diversion were provided. The Laforge-2 Mitigative Master Plan's measures for improving wildlife potential, cleaning-up of tributaries, protecting wildlife habitats, seeding around ponds and humid zones, installing platforms to encourage and facilitate the nesting of ospreys, and promoting proper harvesting of the territory, were described as corrective measures that will promote sustainable development. Contractual obligations to protect the environment were outlined. Enhancement measures described included reclamation of areas disturbed during construction, landscaping around main structures and construction of scenic lookouts. It was fully expected that the mitigative measures described for the Laforge-2 project will minimize negative impacts of the project and will maximize positive ones by improving wildlife potential in areas near the reservoir. 5 figs

  20. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  1. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  2. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  3. Impacts of the operation of existing hydroelectric developments on fishery resources in British Columbia

    International Nuclear Information System (INIS)

    Hirst, S.M.

    1991-01-01

    The main features of 46 hydroelectric dams and diversions in British Columbia are reviewed, and available information on the inland sport fish resources within and below the impoundments are summarized. The projects are collectively responsible for ca 95% of the electrical power used in the province. The characteristics detailed include water license and operational constraints, electrical generation, enhancement facilities, operational regime, physical and chemical environment, downstream system, sportfish populations, and recreational fishery. All the hydroelectric impoundments reviewed, with the possible exceptions of some small headponds, support sport fish populations. Recreational angling quality is considered good for about one quarter of impoundments for which information is available. Low population density is the dominant reason for poor angling quality. Drawdowns exceeding 10 m annually and/or low water retention times are significant impediments to sport fish stock densities. Recommended measures to improve sport fishery resources in and below hydroelectric impoundments include evaluation of the efficiency of ongoing compensation programs, improvement to impact assessment procedures to ensure adequate documentation of pre- and post-impoundment conditions, and enhancement of several systems through stock or nutritional supplementation. 161 refs., 95 figs., 9 tabs

  4. Benefits and applications of modular hydroelectric pumped storage

    International Nuclear Information System (INIS)

    Koebbe, R.S.

    1991-01-01

    This paper reports on hydroelectric pumped storage which is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize overall system performance. Because of increased environmental and regulatory constraints, few acceptable sites, long schedules, and huge financial commitments, large conventional pumped storage plants, are now virtually impossible to build. As an alternative, small modular pumped storage, with project sizes ranging from 25 MW to 200 MW, was created to overcome the difficulties of conventional projects. The modular approach involves standardizing the elements of a pumped storage plant by utilizing specialized siting techniques and optimizing design, equipment, and construction. Compared with conventional pumped storage, the modular design can reduce cost and expedite schedule; reduce environmental concerns and permitting obstacles; and expand applications of energy storage on a utility's system

  5. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  6. Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The case study is an analysis of the legal, institutional, and financial incentives and obstacles to the development of the hydroelectric potential on the Goose River in Maine. The Goose River project concerns development by a private developer, Maine Hydro-Electric Development Corporation. The project is comprised of a five-dam system, with the first dam located at Swan Lake and the fifth dam about one mile from the sea. It will utilize the 7500 acre-feet of storage capacity of Swan Lake to run the four downstream power stations. The system is designed to generate 430 kWs of total capacity which would be sold to Central Maine Power, the local investor-owned public utility.

  7. Flow-Induced Pulsation and Vibration in Hydroelectric Machinery Engineer’s Guidebook for Planning, Design and Troubleshooting

    CERN Document Server

    Dörfler, Peter; Coutu, André

    2013-01-01

    Since the 1970’s, an increasing amount of specialized research has focused on the problems created by instability of internal flow in hydroelectric power plants. However, progress in this field is hampered by the inter­disciplinary nature of the subject, between fluid mechanics, structural mechanics and hydraulic transients. Flow-induced Pulsation and Vibration in Hydroelectric Machinery provides a compact guidebook explaining the many different underlying physical mechanisms and their possible effects.   Typical phenomena are described to assist in the proper diagnosis of problems and various key strategies for solution are compared and considered with support from practical experience and real-life examples. The link between state-of the-art CFD computation and notorious practical problems is discussed  and quantitative data is provided on  normal levels of vibration and pulsation so realistic limits can be set for future projects. Current projects are also addressed as the possibilities and limitatio...

  8. Application of finance project for leverage of small size hydroelectric enterprising; Aplicacao do project finance para alavancagem de empreendimentos hidreletricos de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Silvana dos

    2003-07-01

    In the same way that the majority of the countries, project financing of substructure in Brazil, in project finance modality, depend on a skillful structure of guaranties and contracts to become possible. In the case of projects of centrals of generation of electrical energy, that financial engineering becomes still more complicated. In Brazil, due to particularities of the sectors of electricity, the arrangements of guaranties requested but creditors pass to present levels of complexity and exigency well elevated. The contractual appliances that give support to the project finance, originally projected to developed countries, request an extreme adaptation to these particularities. The development of Brazil is directly related to its capacity in expanding the offer of electric energy in the just measure of the national necessity. In this context, the small central hydroelectric (PCH's) represent, actually, an efficient and fast form to complete the offer of energy in such a way to supply the crescent demand the national market. For its characteristics, that type of undertaking can be developed by small manager, from among which are the owners of the areas in which on can find these hydraulic potentials which, however they do not dispose of capital to integral raising. These undertakings are tasks, normally, of low global cost, at the rate of US$ 1.000,00/k W, and of a smaller ambient impact, compared to the return that they give to the enterprise and to the Brazilian electric system as a whole, by having to receive special attention in the planned politics to the sector and to merit a series of incentives to become business still more attractive. By thinking in the found difficulty by small enterprises in rising undertakings of generation of electric energy of small port through the convectional mechanisms of financing is being proposed in that work a well-founded methodology in the concepts of the modality of financing project finance. (author)

  9. Application of finance project for leverage of small size hydroelectric enterprising; Aplicacao do project finance para alavancagem de empreendimentos hidreletricos de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Silvana dos

    2003-07-01

    In the same way that the majority of the countries, project financing of substructure in Brazil, in project finance modality, depend on a skillful structure of guaranties and contracts to become possible. In the case of projects of centrals of generation of electrical energy, that financial engineering becomes still more complicated. In Brazil, due to particularities of the sectors of electricity, the arrangements of guaranties requested but creditors pass to present levels of complexity and exigency well elevated. The contractual appliances that give support to the project finance, originally projected to developed countries, request an extreme adaptation to these particularities. The development of Brazil is directly related to its capacity in expanding the offer of electric energy in the just measure of the national necessity. In this context, the small central hydroelectric (PCH's) represent, actually, an efficient and fast form to complete the offer of energy in such a way to supply the crescent demand the national market. For its characteristics, that type of undertaking can be developed by small manager, from among which are the owners of the areas in which on can find these hydraulic potentials which, however they do not dispose of capital to integral raising. These undertakings are tasks, normally, of low global cost, at the rate of US$ 1.000,00/k W, and of a smaller ambient impact, compared to the return that they give to the enterprise and to the Brazilian electric system as a whole, by having to receive special attention in the planned politics to the sector and to merit a series of incentives to become business still more attractive. By thinking in the found difficulty by small enterprises in rising undertakings of generation of electric energy of small port through the convectional mechanisms of financing is being proposed in that work a well-founded methodology in the concepts of the modality of financing project finance. (author)

  10. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  11. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  12. Rhode Island crystalline repository project: Technical progress report, 1984-1986

    International Nuclear Information System (INIS)

    1986-01-01

    A Nuclear Waste Fund established by the Nuclear Waste Policy Act of 1982 provided financial support to the State of Rhode Island for its participation in the high-level radioactive waste repository siting program. In 1984, the Office of the Governor set up a multidisciplinary Project Review Team consisting of staff from three State agencies and the University of Rhode Island. Members of the Review Team attended several meetings throughout the reporting period to voice their concerns about siting directly to the US Department of Energy (DOE). Written comments were also submitted on draft plans and reports. Many of Rhode Island's recommendations in these comments were later adopted. In May, 1986, Secretary of Energy John Herrington announced the suspension of the crystalline repository siting program. The remainder of the year was spent monitoring litigation challenging that decision and pending legislation. Administrative phase-down of the program was essentially complete by the close of the calendar year

  13. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  14. Introduction to the Arizona Sky Island Arthropod Project (ASAP): Systematics, Biogeography, Ecology, and Population Genetics of Arthropods of the Madrean Sky Islands.

    Science.gov (United States)

    Moore, Wendy; Meyer, Wallace M; Eble, Jeffrey A; Franklin, Kimberly; Wiens, John F; Brusca, Richard C

    2013-01-01

    The Arizona Sky Island Arthropod Project (ASAP) is a new multi-disciplinary research program at the University of Arizona that combines systematics, biogeography, ecology, and population genetics to study origins and patterns of arthropod diversity along elevation gradients and among mountain ranges in the Madrean Sky Island Region. Arthropods represent taxonomically and ecologically diverse organisms that drive key ecosystem processes in this mountain archipelago. Using data from museum specimens and specimens we obtain during long-term collecting and monitoring programs, ASAP will document arthropod species across Arizona's Sky Islands to address a number of fundamental questions about arthropods of this region. Baseline data will be used to determine climatic boundaries for target species, which will then be integrated with climatological models to predict future changes in arthropod communities and distributions in the wake of rapid climate change. ASAP also makes use of the natural laboratory provided by the Sky Islands to investigate ecological and genetic factors that influence diversification and patterns of community assembly. Here, we introduce the project, outline overarching goals, and describe preliminary data from the first year of sampling ground-dwelling beetles and ants in the Santa Catalina Mountains.

  15. Monitoring marginal erosion in hydroelectric reservoirs with terrestrial mobile laser scanner

    Directory of Open Access Journals (Sweden)

    A. M. G. Tommaselli

    2014-06-01

    Full Text Available Marginal erosions in reservoirs of hydroelectric plants have caused economic and environmental problems concerning hydroelectric power generation, reduction of productive areas and devaluing land parcels. The real extension and dynamics of these erosion processes are not well known for Brazilian reservoirs. To objectively assess these problems Unesp (Univ Estadual Paulista and Duke Energy are developing a joint project which aims at the monitoring the progression of some erosive processes and understanding the causes and the dynamics of this phenomenon. Mobile LASER scanning was considered the most suitable alternative for the challenges established in the project requirements. A MDL DynaScan Mobile LASER M150 scanner was selected which uses RTK for real time positioning integrated to an IMU, enabling instantaneous generation of georeferenced point clouds. Two different reservoirs were choose for monitoring: Chavantes (storage plant and Rosana (run-of-river plant, both in the Paranapanema River, border of São Paulo and Paraná States, Brazil. The monitoring areas are scanned quarterly and analysed with base on the point cloud, meshes, contours and cross sections. Cross sections are used to visualize and compute the rate and the dynamics of erosion. Some examples and quantitative results are presented along with an analysis of the proposed technique. Some recommendations to improve the field work and latter data processing are also introduced.

  16. Reflections on the individual–collective relation in change agency formation in the Samsø renewable energy island project

    DEFF Research Database (Denmark)

    Carlsson, Monica Susanne

    2018-01-01

    This paper offers reflections on change agency formation in the Renewable Energy Island (REI) project on Samsø, following a field visit to the island in June 2016. Both individual and collective agency are set out as central for the processes leading to the change in the REI project, spurring ref...

  17. Small hydroelectric power development in India: a profile

    International Nuclear Information System (INIS)

    Bhattacharya, Partha

    1993-01-01

    Small hydroelectric power plants (SHPs) have a definite role to play in the contemporary energy scenario generally as a source for supplementing the electrical energy production and particularly in remote rural areas in meeting the energy requirements of isolated communities. SHPs practically do not produce any adverse impact.However, their success depends on the ingenuity of the planners and the designers, and more importantly the convection. Another dimension to the success is the participation and involvement of the beneficiaries of the project which are more relevant for the microhydro electric schemes in the remote areas. The major factor that influences the commercial success of the SHP is marketing. It should be given due emphasis. This necessitates the SHP development activities to be more pragmatic and relevant to the society needs; an approach which is programme-based, rather than a project-oriented, is needed. (author). 4 refs

  18. Evaluation of our hydroelectric resources

    International Nuclear Information System (INIS)

    Unsal, Istemi; Onoz, Bihrat

    2006-01-01

    in which it thinks to meet the projections. When the foreseen contribution of our HE installed power to our total installed power and that of our HE energy production to our total energy production for 2005-2020 period is analysed, it is seen that it is foreseen that these contributions are not to be changing at significant levels for the coming 15 years. It has not been possible to explain the fact that 2/3 of our hydroelectric potential, which is independent of foreign countries, is not yet evaluated and the fact that no attempt is made to increase its contribution. This situation should be perceived as an unusual approach in our country.

  19. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  20. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  1. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  2. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  3. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  4. Hydroelectric developments in Nunavik : update on impact benefit agreements

    Energy Technology Data Exchange (ETDEWEB)

    Aatami, P. [Makivik Corp., Makivik, NF (Canada)

    2004-07-01

    The Partnership Agreement on Economic and Community Development in Nunavik is intended to accelerate development of natural resources in Nunavik and promote autonomy of the Inuit regional organizations. This can be accomplished through hydroelectric projects, mining, sport hunting, outfitting and tourism. In recent years, activities in these domains have raised fundamental questions pertaining to the advantages and disadvantages of resource development. The role that the Impact Benefit Agreement has on business opportunities has been examined more closely. The results of the Impact Benefit Agreement and its implication for the Cree Nation and hydro development in untapped regions of northern Quebec were described along with the role of the parties in financing future projects. An overview of the costs, benefits and considerations for hydro opportunities in northern Quebec was presented with reference to the electricity grid and the incentives for large investment. 1 fig.

  5. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  6. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    Directory of Open Access Journals (Sweden)

    Zhiding Chen

    2013-07-01

    Full Text Available With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companies together, to play each company's strengths, lower offer, improve project quality, shorten the construction period and win the competition. In this paper, we started from the definition of Joint Venture, summed up the forms of Joint Venture in water conservancy and hydropower engineering, proposed that the JV modes can be divided into domestic and international union, tight mode, half-tight mode, loose mode, incorporation and consortium. Furthermore, we analyzed the advantages and disadvantages of Joint Venture. Put forward that the JV can relieve the owner from interfacial administrative work, reduce risk of engineering, and raise the success rate of engineering contract, improve the correctness of price and increase the opportunity of project contracting, Learn from other members, enhance technology and management and make full use of idle resources

  7. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  8. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  9. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  10. Interconnection of Broadband Islands via Satellite-Experiments on the Race II Catalyst Project

    National Research Council Canada - National Science Library

    Sun, Z

    1996-01-01

    .... The purpose of the project was to develop an ATM satellite link for the future B-ISDN services, particularly for the interconnections of the ATM testbeds which are in the form of broadband islands...

  11. Evaluation of Pacific Islands Early Childhood Caries Prevention Project: Republic of the Marshall Islands.

    Science.gov (United States)

    Milgrom, Peter; Tut, Ohnmar K

    2009-01-01

    This communication reports an outcomes evaluation of the Pacific Islands Early Childhood Caries Prevention Project. The evaluation includes children in three conditions: a) topical fluoride varnish three times per school year; b) varnish plus twice-per-day toothbrushing; and c) intervention 2 plus three-times-per-day xylitol containing gummy bear snacks at school and home visits to encourage parental involvement. For this evaluation, groups 2 and 3 have been combined. One year after project implementation, mean decayed, extracted, or filled primary teeth was 10.3 [standard deviation (SD)= 4.3] teeth for group 1, and 8.2 (SD = 4.0) teeth for the combination of groups 2 and 3 (P 0.05). Evaluation confirms the outcome of a program including both in-school twice-daily toothbrushing with fluoridated toothpaste and frequent applications of fluoride varnish.

  12. 77 FR 34033 - Public Utility District No. 1 of Douglas County; Notice of Authorization for Continued Project...

    Science.gov (United States)

    2012-06-08

    ... District No. 1 of Douglas County; Notice of Authorization for Continued Project Operation On May 27, 2010, the Public Utility District No. 1 of Douglas County, licensee for the Wells Hydroelectric Project... regulations thereunder. The Wells Hydroelectric Project is located on the Columbia River in Douglas, Okanogan...

  13. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  14. Lower Churchill project

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, B. [Nalcor Energy, St. John' s, Newfoundland (Canada)

    2011-07-01

    This paper discusses the Lower Churchill Hydroelectric Generation Project in Newfoundland Labrador. The project is of national interest as it creates jobs and benefits across Canada. It provides inter provincial electricity grid integration, provides significant contribution to lower emissions and enables development of other renewable generation.

  15. 78 FR 49722 - Tongass National Forest Wrangell Ranger District; Alaska; Wrangell Island Project Environmental...

    Science.gov (United States)

    2013-08-15

    ... on March 13, 2012 (77 FR 14727). This corrected NOI is being published because the project will now... not expected until after September 27, 2013, the Wrangell Island Project is now subject to these new... include 1) timber supply and timber sale economics, 2) old-growth reserve designs, and 3) road access and...

  16. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  17. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  18. GI-POP: a combinational annotation and genomic island prediction pipeline for ongoing microbial genome projects.

    Science.gov (United States)

    Lee, Chi-Ching; Chen, Yi-Ping Phoebe; Yao, Tzu-Jung; Ma, Cheng-Yu; Lo, Wei-Cheng; Lyu, Ping-Chiang; Tang, Chuan Yi

    2013-04-10

    Sequencing of microbial genomes is important because of microbial-carrying antibiotic and pathogenetic activities. However, even with the help of new assembling software, finishing a whole genome is a time-consuming task. In most bacteria, pathogenetic or antibiotic genes are carried in genomic islands. Therefore, a quick genomic island (GI) prediction method is useful for ongoing sequencing genomes. In this work, we built a Web server called GI-POP (http://gipop.life.nthu.edu.tw) which integrates a sequence assembling tool, a functional annotation pipeline, and a high-performance GI predicting module, in a support vector machine (SVM)-based method called genomic island genomic profile scanning (GI-GPS). The draft genomes of the ongoing genome projects in contigs or scaffolds can be submitted to our Web server, and it provides the functional annotation and highly probable GI-predicting results. GI-POP is a comprehensive annotation Web server designed for ongoing genome project analysis. Researchers can perform annotation and obtain pre-analytic information include possible GIs, coding/non-coding sequences and functional analysis from their draft genomes. This pre-analytic system can provide useful information for finishing a genome sequencing project. Copyright © 2012 Elsevier B.V. All rights reserved.

  19. An environmental overview of the Cat Arm hydroelectric development

    International Nuclear Information System (INIS)

    Barnes, J.L.

    1987-01-01

    The Cat Arm Dam hydroelectric development in Newfoundland comprises 10 dams, three tunnels, two canals and a 127 MW powerhouse. The scheme develops 127 MW from 380.5 m of head and comprises: ten dams of varying heights up to 53 m; a bathtub type overflow spillway 330 m in length; a 230 m long inverted U-shaped diversion tunnel; an 800 m long, inverted U-shaped low pressure forebay tunnel; two bog and rock cut tunnels leading to and from the forebay tunnels; a surface powerhouse containing two Pelton turbines; and a 178 km long, 230 kV transmission line. An overview is provided of the environmental assessment, project impacts, and cost of environmental protection associated with the project. Impacts were centered around fish and aquatic life in the created reservoir and downstream of the powerhouse, loss of ungulate (moose and caribou) habitat due to flooding, loss of forestry resources due to flooding, and the disturbance of land during construction. The overall cost of environmental protection was $7,977,000, only 2% of the total project cost. 17 refs., 1 tab

  20. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  1. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  2. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  3. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  4. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  5. Greece, Milos Island Geothermal Project

    International Nuclear Information System (INIS)

    Delliou, E.E.

    1990-01-01

    On Milos island (Aegean Sea) a high enthalpy, water dominated geothermal field of high salinity exists. At 1985, a 2MW geothermoelectric pilot plant was installed on the island. This plant has been provided by Mitsubishi Heavy Industries of Japan under a contract with Public Power Corporation of Greece. Due to high salinity of the geothermal fluid, unforeseen problems (scaling mainly) arisen in both steam and brine cycles. As a consequence, the operation (trial mainly) of the power plant have been interrupted several times for long periods, in order to identify the arisen, each time, problems and find the most appropriate technical solution. The above fact, as well as, some unfortunate coincidences described in this paper, led Milos people to react against geothermal development in their island. The sequence of the events, technical and non-technical, their approach and the relevant conclusions are reported in this presentation

  6. Mitigation and recovery of methane emissions from tropical hydroelectric dams

    Energy Technology Data Exchange (ETDEWEB)

    Bambace, L.A.W.; Ramos, F.M.; Lima, I.B.T.; Rosa, R.R. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos (Brazil)

    2007-06-15

    Tropical hydroelectric reservoirs generally constitute an appreciable source of methane to the atmosphere. This paper proposes simple mitigation and recovery procedures to substantially reduce atmospheric methane emissions from hydroelectric reservoirs. We aim at transforming existing methane stocks of tropical reservoirs into a clean, renewable energy source. The recovered gas methane may be pumped to large consuming centers, stocked locally and burned in gas turbines to generate electricity during high demand periods, or even purified for transport applications. Our simulations show that the use of biogenic methane may increase considerably the energy supply in countries like Brazil. As a result, it would be possible to reduce the need of additional hydroelectric dams, protecting important pristine biomes, and avoiding the resettlement of villages and indigenous reserves. (author)

  7. Canadian Environmental Assessment Act - comprehensive study report: new Grand-Mere hydroelectric facility proposed by Hydro-Quebec

    International Nuclear Information System (INIS)

    1999-06-01

    A description is given of the hydroelectric construction project as well as the environment surrounding it, the outcome of consultations with interest parties in the public, the overall environmental impacts and cumulative impacts with associated problems that may occur in carrying out the project, attempts at project and environmental mitigation, measuring the importance of the cumulative and environmental effects, conditions for project acceptance, and the overall acceptance of the project or its rejection. The older hydroelectric project was constructed in the post-1910 period and being out of date is experiencing operational problems. There are four problem areas that are important including a need for major repairs to the turbine-generators, lack of flexibility and low electrical capacity that affect the working of the sending-end substation, a state of deterioration affecting operation of the spillways concrete structure, and a bottleneck problem on the Saint-Maurice river caused by the low flow design of the Grand-Mere power station in comparison with that of the Saint-Maurice station. Considering economical, social and environmental factors, of the three options of abandoning the site, upgrading the existing site or constructing a new one, the third option is the preferred one, a conclusion based on considering the out of date state of Grand-Mere facilities and the bottleneck flow condition created on the Saint-Maurice river by the older station. Given the proposed efforts at mitigation, and the follow-up operations stated by the third option advocate, the Department of Fisheries and Oceans is of the opinion that the proposed plans will not affect the environment in an adverse manner. 7 refs

  8. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  9. Island dynamics and Minoan expansion in the Aegean: the Kythera Island Project

    Directory of Open Access Journals (Sweden)

    Cyprian Broodbank

    1999-11-01

    Full Text Available In recent years archaeologists have become increasingly interested in the investigation of island societies. At a global level, discoveries in the Pacific, Caribbean, Mediterranean and elsewhere have greatly improved our understanding of the antiquity and dynamics of island life. Now archaeologists at the Institute, together with other colleagues, have embarked on a long-term interdisciplinary study of the island of Kythera in the Aegean.

  10. Hydroelectricity and territories; L'hydroelectricite et les territoires

    Energy Technology Data Exchange (ETDEWEB)

    Rocq, Sylvie [Syndicat Mixte d' Etude et d' Amenagement de la Garonne, 61, rue Pierre Cazeneuve 31200 Toulouse (France); Moor, Jean-Francois; Comeau, Aline [Agence de l' eau Adour-Garonne, 90 rue de Feretra 31078 Toulouse Cedex 4 (France); Thomas, Michael [Etablissement Public Territorial du Bassin de la Dordogne - Epidor, Le Tournepique, 24250 Castelnaud-la-Chapelle (France)

    2012-01-15

    On our river territories, the development of renewable energy and the restoration of the quality of the aquatic ecosystems both illustrate the need to reconcile the different usages of water resources while still guaranteeing proper functioning of the ecosystems. Hydroelectricity is the crux of the problem. Because of its mountainous hydrographic network and its favourable hydrology, the Adour-Garonne basin witnessed large-scale development of its hydroelectric potential throughout the 20. century. Approaching the question of hydroelectricity from the point of view of the river territories puts all the challenges facing them into their true perspective. Two distinct examples in the Adour-Garonne basin illustrate the partnership between the Water Agency and the local authorities in the Garonne and Dordogne basins: on the Garonne River, reconciling water usages with the maintenance of adequate water levels at times of drought; on the Dordogne River, reducing the impact of the hydro-peaking. (authors)

  11. Hydroelectric production from Brazil's São Francisco River could cease due to climate change and inter-annual variability.

    Science.gov (United States)

    de Jong, Pieter; Tanajura, Clemente Augusto Souza; Sánchez, Antonio Santos; Dargaville, Roger; Kiperstok, Asher; Torres, Ednildo Andrade

    2018-09-01

    By the end of this century higher temperatures and significantly reduced rainfall are projected for the Brazilian North and Northeast (NE) regions due to Global Warming. This study examines the impact of these long-term rainfall changes on the Brazilian Northeast's hydroelectric production. Various studies that use different IPCC models are examined in order to determine the average rainfall reduction by the year 2100 in comparison to baseline data from the end of the 20th century. It was found that average annual rainfall in the NE region could decrease by approximately 25-50% depending on the emissions scenario. Analysis of historical rainfall data in the São Francisco basin during the last 57years already shows a decline of more than 25% from the 1961-90 long-term average. Moreover, average annual rainfall in the basin has been below its long-term average every year bar one since 1992. If this declining trend continues, rainfall reduction in the basin could be even more severe than the most pessimistic model projections. That is, the marked drop in average rainfall projected for 2100, based on the IPCC high emissions scenario, could actually eventuate before 2050. Due to the elasticity factor between rainfall and streamflow and because of increased amounts of irrigation in the São Francisco basin, the reduction in the NE's average hydroelectric production in the coming decades could be double the predicted decline in rainfall. Conversely, it is estimated that wind power potential in the Brazilian NE will increase substantially by 2100. Therefore both wind and solar power will need to be significantly exploited in order for the NE region to sustainably replace lost hydroelectric production. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. [Twenty-year surveillance of insects relevant to public health during the construction of hydroelectric facilities in Antioquia, Colombia].

    Science.gov (United States)

    Zuluaga, Walter Alonso; López, Yolanda Lucía; Osorio, Lisardo; Salazar, Luis Fernando; González, Marta Claudia; Ríos, Claudia María; Wolff, Marta Isabel; Escobar, José Pablo

    2012-09-01

    Entomological studies conducted in large hydroelectric infrastructure projects are a tool for the prevention and control of vector-borne diseases. These diseases emerge as a consequence of changes made to the terrain that often increase the natural and artificial mosquito larval habitats. Many of these insects are of public health importance and population increases result in an increased risk of disease transmission. The culicine (mosquito) and phlebotomine (sand fly) populations were characterized in the area of the Porce II and Porce III hydroelectric projects of Antioquia between 1990 to 2009. Periodical entomological samplings were made in the area of impact, in the workers camps, and construction sites. Adult specimens were captured with nets, Shannon light traps, CDC light traps, and protected human bait. Mosquito larvae of the following species were identified: Culex coronator, Culex nigripalpus, Culex corniger, Culex quinquefasciatus and Limatus durhami. The most frequently identifiers of larval habitats were low tanks, waste cans, tires, and aquatic plants. Aedes aegypti specimens were captured in only two rural locations from two municipalities within the area of influence. Specimens from the following mosquito genera were captured in forest areas: Aedes, Mansonia, Culex, Psorophora, Wyeomyia, Phonyomyia, Uranotaenia, Haemagogus and Sabethes. The most important mosquito found was Haemogogus janthinomis, an efficient yellow fever vector in Colombia. The area has been endemic for leishmaniasis and in the current study, 20 species of Lutzomyia sand flies, potential vectors, were identified. Among malaria vectors, the most important species found in the area were Anopheles nuneztovari and Anopheles pseudopunctipennis. A wide variety of vectors were discovered in the area of the Porce II and Porce III hydroelectric projects, and many of these were relevant for public health. Further monitoring will be necessary to minimize disease transmission risks among the

  13. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  14. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    Science.gov (United States)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  15. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  16. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  17. Economic performance of small scale hydroelectric power plants: `Results center`; Desempenho economico de PCH`s: centro de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Cipoli, Jose Adolfo; Silva, Jose Paulo Mendes [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil)

    1995-12-31

    This work presents the experience concerning the creation of an imaginary company named `CPFL Generator`, composed by 20 small scale hydroelectric power plants. The main idea of the project is to analyse the economic performance of each unit individually and the group as a company, enabling to a better quality management 3 refs., 1 fig., 7 tabs.

  18. Managing the Cost Overrun Risks of Hydroelectric Dams: An Application of Reference Class Forecasting Techniques

    OpenAIRE

    Omotola Awojobi; Glenn P. Jenkins

    2015-01-01

    Hydropower investments have been subject to intense criticism over environmental issues and the common experience with cost uncertainty. In this study we address the issue of uncertainty in cost projections by applying reference class forecasting (RCF) in order to improve the reliability of costs used for making decisions under uncertainty. This technique makes it possible to closely link contingency estimates to the likely incidence of uncertainty of construction costs for hydroelectric dams...

  19. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    Science.gov (United States)

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  20. Climate change and hydroelectric production

    International Nuclear Information System (INIS)

    Raban, R.R.

    1991-01-01

    Manitoba Hydro is planning for the possibility of climate change, which has the potential to adversely effect its hydroelectric generating potential. Theoretical and physical evidence for a global warming are reviewed, and it is shown that some of Manitoba Hydro's own measurements support a warming hypothesis. The most significant effect on the hydraulic generating system would be associated with diminished river flows. Winter hydraulic generation capability would be reduced if the magnitude of the change were sufficient to cause several freeze-ups and break-ups within a given season. Incidence of transmission line icing would probably increase, permafrost recession may undermine tower foundations, and conductor resistance may increase to increase energy loss. Ice crossings and winter roads would be adversely affected, and a restriction on fossil fuel consumption could limit thermal generation and increase demand for hydroelectric or nuclear energy. Manitoba Hydro is examining a number of no-cost or low-cost options to accomodate potential climate change, using probable maximum precipitation hydrologic technology, research into conductor galloping, line icing detection, and hydrological investigations

  1. Hydraulic potential evaluation for micro - scale hydroelectric generation at Chicamocha River Basin - micro - scale hydroelectric plants

    International Nuclear Information System (INIS)

    Pacheco P, C.M.; Parga C, G.M.

    1995-01-01

    In development of technical and scientific cooperation treaty carried out between INEA (today Ingeominas) and Catholic University of Colombia, was elaborated the program: Potential Evaluation Hydraulic for Small hydroelectric plants; whose purpose is to carry electrical energy service to smaller populations and rural zones to all municipalities of country. To begin the program was selected the corresponding area to Chicamocha River Basin, the one which corresponds to 72 Municipalities of Boyaca and Santander Departments, due to the fact that is had good information area originating from diagnostic elaborated by INDERENA with the objective of formulating the Classification Plan and the Basin Managing. This Thesis consists of: 1. To identify all micro-basins; 2. To analyze energy demand on part of kernels of population seated in the study area; 3. To evaluate energy generating capacity of water currents and 4. As of the obtained results, to propose alternative for small hydroelectric plants design (PCH) according to defined needs

  2. Optimized Renewable and Sustainable Electricity Generation Systems for Ulleungdo Island in South Korea

    Directory of Open Access Journals (Sweden)

    Kyeongsik Yoo

    2014-11-01

    Full Text Available The South Korean government has long been attempting to reduce the nation’s heavy reliance on fossil fuels and increase environmental safety by developing and installing renewable power generation infrastructures and implementing policies for promoting the green growth of Korea’s energy industry. This study focuses on the use of independent renewable power generation systems in the more than 3000 officially affirmed islands off Korea’s coast and proposes a simulated solution to the electricity load demand on Ulleungdo Island that incorporates several energy sources (including solar, batteries, and wind as well as one hydro-electric and two diesel generators. Recommendations based on the simulation results and the limitations of the study are discussed.

  3. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  4. Climate change impacts on high-elevation hydroelectricity in California

    Science.gov (United States)

    Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.

    2014-03-01

    While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.

  5. Obstacles to hydroelectric power. VDI conference on chances of hydroelectric power - conservation and environmental protection in conflict

    International Nuclear Information System (INIS)

    Sauer, H.D.

    1994-01-01

    Hydroelectric power is one of the most efficient energy sources and presents no CO 2 pollution problem, but there are obstacles as was shown at a VDI conference. Regional landscape conservation interests are in conflict with global environmental protection considerations. (orig.) [de

  6. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development IV: Fish Mortality Resulting From Turbine Passage

    Energy Technology Data Exchange (ETDEWEB)

    Turbak, Susan C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Reichle, Donna R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shriner, Carole R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-01-01

    The purpose of this report is to provide summary information for use by potential developers and regulators of small-scale hydroelectric projects (defined as existing dams that can be retrofitted to a total site capacity of ≤30 MW), where turbine-related mortality of fish is a potential issue affecting site-specific development. Mitigation techniques for turbine-related mortality are not covered in this report.

  7. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P; Croci, S; Ernst, J -R

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  8. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.

  9. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  10. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  11. Will initiatives to promote hydroelectricity consumption be effective? Evidence from univariate and panel LM unit root tests with structural breaks

    International Nuclear Information System (INIS)

    Lean, Hooi Hooi; Smyth, Russell

    2014-01-01

    This paper examines whether initiatives to promote hydroelectricity consumption are likely to be effective by applying univariate and panel Lagrange Multiplier (LM) unit root tests to hydroelectricity consumption in 55 countries over the period 1965–2011. We find that for the panel, as well as about four-fifths of individual countries, that hydroelectricity consumption is stationary. This result implies that shocks to hydroelectricity consumption in most countries will only result in temporary deviations from the long-run growth path. An important consequence of this finding is that initiatives designed to have permanent positive effects on hydroelectricity consumption, such as large-scale dam construction, are unlikely to be effective in increasing the share of hydroelectricity, relative to consumption of fossil fuels. - Highlights: • Applies unit root tests to hydroelectricity consumption. • Hydroelectricity consumption is stationary. • Shocks to hydroelectricity consumption result in temporary deviations from the long-run growth path

  12. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  13. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    International Nuclear Information System (INIS)

    Niezen, R.

    1993-01-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs

  14. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    Energy Technology Data Exchange (ETDEWEB)

    Niezen, R [Harvard Univ., Boston, MA (United States)

    1993-11-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs.

  15. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  16. Mrica Hydroelectric Project: a study in partnering

    International Nuclear Information System (INIS)

    Loraine, R.K.; Bannmark, O.

    1993-01-01

    This paper describes the contractual and financial aspects of the Mrica Project. Of particular interest is the high degree of cooperation that developed between the various parties, and the effect this had on the progress and completion of the project. This relationship had its origin in the need to make the best use of the relatively scarce funds available. It was vitally important that problems were solved jointly and that costs did not escalate as a result of confrontation between the parties. In this respect, the project was an early manifestation of the contractual relationship now called partnering, and the procedures adopted at Mrica are very similar to those now widely used in partnering contracts. The paper is therefore structured to identify and analyse the key elements of co-operation, and their impact on both the negotiation of the contracts and the completion of the works. (Author)

  17. Effectiveness of water release as mitigation for hydroelectric impacts to fish

    International Nuclear Information System (INIS)

    Lewis, A.F.; Mitchell, A.C.

    1995-01-01

    Utility companies release water to mitigate the effects of hydroelectric projects on fish habitats. Utility companies, government agencies, and research communities in Canada, the US, Europe, New Zealand, and Australia were surveyed as part of a Canadian Electrical Association study to evaluate the effectiveness of water release as a mitigation. Respondents identified only 28 projects in which water was released specifically to protect fish habitats. Fewer than half of these projects (12) were judged as being effective. Six case histories with preimpact assessment and postimpact monitoring were reviewed. In four cases fish habitat or fish populations or both were maintained; in two cases they were not. The effectiveness of water release differed among rivers and fish species, and was greatest when designed to meet the habitat requirements of each life-history stage. A review of the literature did not support the theory that a particular fraction of the mean annual flow provides the bet fish habitat. Although smaller changes in the flow regime had smaller effects, increasing minimum flows above those historically observed did not necessarily increase fish production

  18. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  19. A collaborative archaeological research and conservation project for Moriori carved trees (rakau momori), Rekohu (Chatham Island)

    International Nuclear Information System (INIS)

    Barber, I.; Maxwell, J.

    2011-01-01

    In January-February 2010 a conservation and site-recording project began on Rekohu (Chatham Island) to locate, assess and digitally scan archaeological carved trees known as rakau momori ('dendroglyphs'). This paper briefly considers earlier work on carved trees before reporting preliminary and anticipated outcomes from our recent collaborative rakau momori archaeological project. 14 refs., 9 figs., 2 tabs.

  20. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrandt, S. G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bell, M. C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Anderson, J. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Richey, E. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parkhurst, Z. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  1. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  2. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  3. 76 FR 14651 - BOST4 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-03-17

    ... Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the... No.: P-12757-003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC...

  4. 77 FR 785 - BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-06

    ... Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC...

  5. 76 FR 21885 - BOST5 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-04-19

    ... Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the... No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC...

  6. 77 FR 786 - BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-06

    ... Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12757-003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC...

  7. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  8. Model documentation report: Short-Term Hydroelectric Generation Model

    International Nuclear Information System (INIS)

    1993-08-01

    The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration's (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook

  9. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  10. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  11. 76 FR 14653 - BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2011-03-17

    ... Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12756-003. c. Date filed: July 26, 2010. d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3...

  12. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  13. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  14. Eradicating the tsetse fly on Zanzibar Island: A model project

    International Nuclear Information System (INIS)

    2003-01-01

    Tsetse flies infest vast areas of Africa and transmit a parasitic disease which devastates livestock herds and spreads debilitating 'sleeping sickness' amongst people. Past efforts to control the disease - Trypanosomosis - and the carrier insects have met with only limited success. But now an environmentally friendly technology called the Sterile Insect Technique (SIT) may provide a lasting solution to this scourge. Working with the Tanzanian Government and Zanzibar authorities, the Department of Technical Co-operation has sponsored a 'Model Project', with technical support from the Joint FAO/IAEA Division, to eradicate the tsetse fly completely from Zanzibar Island by applying SIT. (IAEA)

  15. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  16. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  17. improvement of hydroelectric power generation using pumped

    African Journals Online (AJOL)

    HOD

    1, 4 DEPARTMENT OF SYSTEMS ENGINEERING, UNIVERSITY OF LAGOS, AKOKA, YABA, ... pumped storage system for generating hydroelectric power all year round. ... Power supply situation in Nigeria has no doubt ..... (objective functions), criteria for evaluation of control .... adsen H “Para eter esti ation in distributed.

  18. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  19. Carbon stored in forest plantations of Pinus caribaea, Cupressus lusitanica and Eucalyptus deglupta in Cachí Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Marylin Rojas

    2014-06-01

    Full Text Available Forest plantations are considered the main carbon sinks thought to reduce the impact of climate change. Regarding many species, however, there is a lack of information in order to establish metrics on accumulation of biomass and carbon, principally due to the level of difficulty and the cost of quantification through direct measurement and destructive sampling. In this research, it was evaluated carbon stocks of forest plantations near the dam of hydroelectric project Cachí, which belongs to Instituto Costarricense de Electricidad. 25 unit samples were evaluated along some plantations that contain three different species. 30 Pinus caribacea trees, 14 Cupressus lusitanica and 15 Eucalyptus deglupta were extracted. The biomass was quantified by means of the destructive method. First of all, every component of the tree was weighed separately; then, sampling was obtained in order to determine the dry matter and the carbon fraction. 110 biomass samples from the three species were analyzed in laboratory, including all the components (leaves, branches, shaft, and root. The carbon fraction varied between 47,5 and 48,0 for Pinus caribacea; between 32,6 and 52,7 for Cupressus lusitanica, and beween 36,4 and 50,3% for Eucalyptus deglupta. The stored carbon was 230, 123, and 69 Mg ha-1 in plantations of P. caribaea, C. lusitanica and E. deglupta, respectively. Approximately, 75% of the stored carbon was detected in the shaft.

  20. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-12-01

    BNL is developing and implementing the project ``Geographic Information System (GIS) for Long Island`` to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ``Feasibility of a Geographic Information System for Long Island.`` It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP).

  1. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    International Nuclear Information System (INIS)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-01-01

    BNL is developing and implementing the project ''Geographic Information System (GIS) for Long Island'' to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ''Feasibility of a Geographic Information System for Long Island.'' It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP)

  2. Sustainable Mobility for Tourists at the Dutch Coastal Islands (Waddeneilanden)

    NARCIS (Netherlands)

    Sminia, O.; Vogtländer, J.G.; Brezet, J.C.

    2010-01-01

    The European Coastal Islands around the North sea, are joined together in a project that stimulates sustainable development. Within this 'Cradle-to-Cradle Islands' project, some islands were selected as breading grounds for potentially sustainable projects. One of these projects was the development

  3. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  4. Development of the Qattara Project, Egypt

    International Nuclear Information System (INIS)

    1978-01-01

    The River Nile, as a huge source of cheap hydroelectric energy, was fully exploited in Egypt upstream of Aswan in 1968 by the construction of the famous Aswan and High Dam Hydroelectric Complex. The growth of demand for electrical power is such that an additional large source of energy is required. The Qattara Project would offer not only an ideal source of low cost power production, but a vital boost for Egypt's national economy. The fundamental idea of the scheme is to channel Mediterranean Sea water into the Qattara Depression, using the difference in levels to produce hydroelectric power. The rate of discharge of sea water into the depression should be equivalent to the rate of evaporation from the lake surface. This situation will arise ten years after starting to fill the lake, when the water has reached a level of 60 m below sea level. The possibility of using PNE to excavate a Mediterranean Sea - Qattara Depression canal was first postulated by the Egyptian Atomic Energy Establishment in 1971. In 1973 a pre-feasibility study was prepared, based on preliminary site investigations performed during the period 1964-1965, namely geological and cartographic surveys, as well as on comparative economic evaluation of various solutions. The study showed clearly that the project including both base-load and peak-load hydroelectric power stations and using nuclear excavation of a canal between the sea and the depression offers a competitive solution for cheap power production. A subsequent feasibility study, which was started in 1975, investigates alternative ways of constructing the canal/tunnel system, using conventional tunnelling and PNE. For the nuclear solution, two cases are considered, one using unlimited yields and another with 150 kt maximum yield. A preliminary assessment of the effects of the explosion and costs of the nuclear component of the project are given. (author)

  5. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  6. Renewable Energy in the Pacific Islands: An overview and exemplary projects

    International Nuclear Information System (INIS)

    Hourcourigaray, Jean; Wary, David; Bitot, Stephane; Audras, Frederic; Riviere, Francoise

    2014-10-01

    The objective of this study was to provide an objective documentary source, relevant and usable for institutional and economic players at a regional colloquium on renewable energies which was to be organized by the French Polynesian community and the High Commission of the Republic in the second quarter of 2014. However, the date was put back due to local political changes which occurred following the last territorial elections (mid-2013). More largely, in the context of the fight against climate change, the subject of renewable energies takes on considerable importance. A large number of island States in the Pacific zone are extremely dependent on fossil fuels, and in the coming years, will face major impacts related to climate change (biodiversity, rising sea level, food security,...). It should be noted here that the small island countries (notably those of the Pacific) which belong to the intergovernmental organization AOSIS (Alliance of Small Island States), constitute a real lobbying force in the face of large industrialized countries at climate negotiations. Images of the Maldives' Council of Ministers meeting underwater demonstrate the will of small island States to make themselves heard at the highest levels. The notion of 'climate refugees' is not a mere idea; it could soon become a veritable legal concept. This study in no way claims to meet these challenges, but strives to highlight some solutions which are working ('good practices' in donors' terms), in order to propose adapting or replicating them. The accepted approach is thus above all positive and constructive: solutions exist, sometimes at low cost, and the projects help give Pacific peoples the feeling that they belong to wider global community, not to mention a sometimes small but important part of their harmony

  7. Caxingo - a promising model for integrating the hydroelectric work camps to the site communities

    International Nuclear Information System (INIS)

    Luna, A.M.; Falcao, A.A.

    1989-01-01

    The social and economical impacts caused by the hydroelectric work camps in the sites where the hydroelectric will be constructed are studied, analysing the great supply of works when the hydroelectric is been constructed face to the reduction one when the works are concluded; the neglect by the State in providing medical and educational assistances to the neighbour populations; the appearance of a commerce in the neighbour areas; the employer stableness in the camp after the pension and the lack by the neighbour cities of a social and economical substructure to offer to the population, that come with the hydroelectric construction. A new solution for these problems is presented in the Xingo camp, where the camp will be as a district of city near to the work, with community services provide by the State and the needful substructure to its construction and the equipment provide by the concessionaire. (C.G.C.). 1 fig

  8. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  9. Cross currents : hydroelectricity and the engineering of northern Ontario

    International Nuclear Information System (INIS)

    Manore, J.L.

    1999-01-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations' peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario's north and south. refs., figs

  10. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  11. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  12. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    International Nuclear Information System (INIS)

    Barros, Carlos P.; Peypoch, Nicolas

    2007-01-01

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency

  13. Science evaluation of the environmental impact statement for the lower Churchill hydroelectric generation project to identify deficiencies with respect to fish and fish habitat

    International Nuclear Information System (INIS)

    Clarke, K.

    2009-01-01

    This report evaluated an environmental impact statement (EIS) submitted by a company proposing to develop a hydroelectric generation project in the lower Churchill River in Labrador. Construction of the facilities will alter the aquatic environment of the river as well as the receiving environment of lakes. The alterations are expected to have an impact on fish and fish habitats. The study evaluated the methods used to describe and predict impacts in the aquatic environment and examined models used for predictions in order to assess uncertainty levels. Results of the evaluation demonstrated that additional efforts are needed to document local knowledge of fish use and fish habitat, and that the magnitude of expected changes to fish habitat must be considered relative to the loss of fish habitat. The study also highlighted areas within the EIS that will require further clarification. A number of the studies used in the EIS had small sample sizes that increased the uncertainty of predictions made using the data. Uncertainties related to potential changes in flushing rates and morphological features was also needed. The impact of direct fish mortality from turbine operations was not addressed in a population context, and further information is needed to evaluate potential project-related effects on a species-by-species basis. 3 refs., 4 tabs.

  14. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  15. Report on the development perspectives of the hydroelectric production in France

    International Nuclear Information System (INIS)

    2006-03-01

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  16. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant efficiency, volumetric water flow through the turbine and ...

  17. Balbina's region sustainable development project

    International Nuclear Information System (INIS)

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  18. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  19. Hydroelectric dams in Amazon as source of GHG

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-01-01

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH 4 and CO 2 emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO 2 emissions from the above water biomass, the authors' focus will be restricted to the formulae for calculating the cumulative effect of CO 2

  20. Hydroelectric power generation assessment for Russia: Cooperation in a mutual transfer of technology

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, M.F. [Harza Engineering Co., Chicago, IL (United States); Meloy, G.R. [Army Corps of Engineers, Lake Oswego, OR (United States); Semenkov, A.V. [Energopromtechnika Group Ltd., Moscow (Russian Federation)

    1995-12-31

    In September 1993, Russian Federation Prime Minister Chernomyrdin and United States Vice President Gore agreed on a joint study to examine options for Russia`s energy future. The objective of the study would be to develop a long-term, comprehensive program for the Russian power sector. A joint Russian-American program was established by the United States government. This program was charged to assess all aspects of the Russian energy sector, including conservation, thermal energy, nuclear energy, transmission line systems, and hydropower energy. The objective of the hydropower energy assessment aspect of the study was to prepare a time-phased investment plan for the period 1995 to 2000 for expansion of the existing hydroelectric energy production. The Hydropower Assessment Project required a close working relationship between engineers from the United States and the Russian Federation. The Project Team was given unprecedented access to design and economic data of existing and planned hydropower projects in the Russian Federation. This paper presents the methodology of the hydropower generation assessment for Russia, focusing on the partnering of American and Russian engineers, which led to a mutual transfer of technology and a successful project.

  1. Carbon emission from global hydroelectric reservoirs revisited.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.

  2. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  3. Power improvement and modernization of small scale hydroelectric power plants in Brazil; Recapacitacao e modernizacao de PCH`s no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Nascimento, Jose Guilherme Antioga do [Departamento Nacional de Aguas e Energia Eletrica (DNAEE), Brasilia, DF (Brazil); Amaral, Cristiano Abijaode [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    Several small scale hydroelectric power plants existing in Brazil have been abandoned due to recent projects of large scale units, however, some of than still present workable conditions. Due to that fact, several Brazilian electric power companies have been considering the possibility of modernizing such old units as an alternative for regional electric power generation. This work discusses the above mentioned issues 3 refs., 5 figs., 9 tabs.

  4. Detailed Urban Heat Island Projections for Cities Worldwide: Dynamical Downscaling CMIP5 Global Climate Models

    Directory of Open Access Journals (Sweden)

    Dirk Lauwaet

    2015-06-01

    Full Text Available A new dynamical downscaling methodology to analyze the impact of global climate change on the local climate of cities worldwide is presented. The urban boundary layer climate model UrbClim is coupled to 11 global climate models contained in the Coupled Model Intercomparison Project 5 archive, conducting 20-year simulations for present (1986–2005 and future (2081–2100 climate conditions, considering the Representative Concentration Pathway 8.5 climate scenario. The evolution of the urban heat island of eight different cities, located on three continents, is quantified and assessed, with an unprecedented horizontal resolution of a few hundred meters. For all cities, urban and rural air temperatures are found to increase strongly, up to 7 °C. However, the urban heat island intensity in most cases increases only slightly, often even below the range of uncertainty. A potential explanation, focusing on the role of increased incoming longwave radiation, is put forth. Finally, an alternative method for generating urban climate projections is proposed, combining the ensemble temperature change statistics and the results of the present-day urban climate.

  5. Renewable energy islands in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Oestergaard, Iben [ed.

    1998-12-31

    This publication includes a compiled presentation of various aspects concerning the possible transformation of some European islands into renewable energy communities and these projects were presented by a selection of pioneer islands at the first European Seminar on Renewable Energy Islands, held on the Danish island of Samsoee, 29-30 June 1998. This issue has increased in importance with the presentation of the ambitious EU-White Paper: `Energy for the future: Renewable Sources of Energy` which was adopted in 1998. One of the key elements of the strategy for an accelerated implementation of renewable energy is to transform 100 localities within Europe into communities which are to be 100% self-sufficient with renewable energy before 2010. In line with this strategy, the Danish Government appointed the island of Samsoe towards the end of 1997 to be the first `official` Danish, renewable energy island. This is to serve as a demonstration project for other local communities, both in Denmark as well as in the rest Europe. Gothland, Madeira, Canary Islands, Cape Verde, Arki, Crete, Minorca and Orkney Islands were represented. Environmental advantages of wind, solar and wave power for distant island communities were indicated. Serious savings would be achieved by limitation of fossil fuel import and utilization of local resources. (EG)

  6. Pollution and power generation: environmental implications Small Hydroelectric Plants of Sao Paulo

    Directory of Open Access Journals (Sweden)

    Giorgia Limnios

    2015-06-01

    Full Text Available The current situation of water scarcity of of São Paulo State, manifested as imminent risk of shortages in major urban areas, has led not only to issues concerning preservation of water resources, but also problems related to energy availability, identified in a series of expeditions field carried out under the project " Electricity History of the State of Sao Paulo (1890-1960: Industrial Heritage , Landscape and Environment – Electromemory II”. The objective of this project is to study an extremely representative set of power plants and small hydroelectric power plants built during the initial period of electrification of the State of São Paulo – Brazil (1890-1960, along with its evolution within the social, historical and geographical aspects, to highlight the landscape changes resulting from the electrification process, as well as beneficiaries and impacts on landscape during the study period. In all visits, in addition to the problem of water scarcity, we verified that the power plants face generation constraints related to severe water pollution, either by diffuse or point sources. Some studies conducted in Brazil have analyzed the interference of pollution in power generation , highlighting the role of diffuse sources such as solid waste, sediments from areas with strong erosion, lubricant oils from vehicles or the development of invasive species, particularly as macrophytes, causative agents of biochemical changes that promote the formation of chemical compounds able to erode the electromechanical equipment of the plants or even prevent the flow of water intake into the same. The power plants covered by Electromemory II Project scope have these same problems, which prompted the need to establish a relationship between pollution in its various forms and the generation of electricity. To establish this bridge, the survey of publications and technical reports was necessary as well asresearches inenvironmental legislation

  7. Comparison of Gross Greenhouse Gas Fluxes from Hydroelectric Reservoirs in Brazil with Thermopower Generation

    Science.gov (United States)

    Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.

    2013-05-01

    shown a large variation in the data on greenhouse gas emissions, which would suggest that more care, should be taken in the choice of future projects by the Brazilian electrical sector. The emission of CH4 by hydroelectric reservoirs is always unfavorable, since even if the carbon has originated with natural sources, it is part of a gas with higher GWP in the final calculation. Emissions of CO2 can be attributed in part to the natural carbon cycle between the atmosphere and the water of the reservoir. Another part could be attributed to the decomposition of organic material, caused by the hydroelectric dam.

  8. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    Science.gov (United States)

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  9. Impact of PETIT-SAUT hydroelectric dam on aquatic life (French Guyana)

    International Nuclear Information System (INIS)

    Sissakian, C.

    1992-01-01

    The construction of the hydroelectric scheme of PETIT-SAUT in French Guyana creates a reservoir which covers 310 km 2 of tropical rain forest. This hydroelectric scheme has an influence on the various aspects of the environment. One of the most important aspects is the modification of the water quality and of the aquatic life due to the degradation of organic matter. Some studies of the biology of these area fishes are initiated. At the same time, Electricite de France studies some constructive arrangements and reservoir managements to assure, the most rapidly possible, a return to an aquatic normal life. 6 refs

  10. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  11. How Will Teachers Fare in Rhode Island's New Hybrid Pension Plan? Public Pension Project Brief 4

    Science.gov (United States)

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    Hybrid retirement plans that combine defined benefit pensions with 401(k) type, defined contribution accounts can play important roles in the reform of public-sector pensions. Summarizing results from our longer report ["How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project" (2014)], this…

  12. Wind as a feasible alternative source for improving the deficiency of hydroelectricity in Tanzania

    International Nuclear Information System (INIS)

    Kainkwa, R. M.

    2006-01-01

    Hydroelectricity is the main source of electricity in Tanzania since about 86% of the electricity generated is from this source. During the dry season there is normally a storage of water in the dams and as such the electricity generated is below the demand. In 2004 a natural gas power plant was inaugurated to alleviate this shortage of electricity. When generating electricity from natural gas, exotic gases are emitted which pollute our environment. This source of energy also cannot regenerate itself within the human life scale. Wind is a renewable source that can be used to supplement the shortage of hydroelectricity in Tanzania. Wind speed data collected from a location with high wind energy potential shows that electricity can be generated from the wind to alleviate this shortage of hydroelectricity. Wind and rainfall data demonstrate further that the windy season, which is from July to November coincide with the dry season in which the use of wind energy in electric generation can help to fill the gap of the hydroelectricity that prevails during that season. The use of wind instead of natural gas will reduce the environmental pollution that results from extracting energy from the fossil fuel source.(Author)

  13. Phase I Marine and Terrestrial Cultural Resources Survey of 13 Project Items Located on Marsh Island, Iberia Parish, Louisiana

    National Research Council Canada - National Science Library

    Barr, William

    1999-01-01

    This report presents the results of Phase I cultural resources survey and archeological inventory of two marine and 11 terrestrial project items on and near Marsh Island in Iberia Parish, Louisiana...

  14. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  15. Projected atoll shoreline and run-up changes in response to sea-level rise and varying large wave conditions at Wake and Midway Atolls, Northwestern Hawaiian Islands

    Science.gov (United States)

    Shope, James B.; Storlazzi, Curt; Hoeke, Ron

    2017-01-01

    Atoll islands are dynamic features that respond to seasonal alterations in wave conditions and sea level. It is unclear how shoreline wave run-up and erosion patterns along these low elevation islands will respond to projected sea-level rise (SLR) and changes in wave climate over the next century, hindering communities' preparation for the future. To elucidate how these processes may respond to climate change, extreme boreal winter and summer wave conditions under future sea-level rise (SLR) and wave climate scenarios were simulated at two atolls, Wake and Midway, using a shallow-water hydrodynamic model. Nearshore wave conditions were used to compute the potential longshore sediment flux along island shorelines via the CERC empirical formula and wave-driven erosion was calculated as the divergence of the longshore drift; run-up and the locations where the run-up exceed the berm elevation were also determined. SLR is projected to predominantly drive future island morphological change and flooding. Seaward shorelines (i.e., ocean fronted shorelines directly facing incident wave energy) were projected to experience greater erosion and flooding with SLR and in hypothetical scenarios where changes to deep water wave directions were altered, as informed by previous climate change forced Pacific wave modeling efforts. These changes caused nearshore waves to become more shore-normal, increasing wave attack along previously protected shorelines. With SLR, leeward shorelines (i.e., an ocean facing shoreline but sheltered from incident wave energy) became more accretive on windward islands and marginally more erosive along leeward islands. These shorelines became more accretionary and subject to more flooding with nearshore waves becoming more shore-normal. Lagoon shorelines demonstrated the greatest SLR-driven increase in erosion and run-up. They exhibited the greatest relative change with increasing wave heights where both erosion and run-up magnitudes increased. Wider

  16. Projected atoll shoreline and run-up changes in response to sea-level rise and varying large wave conditions at Wake and Midway Atolls, Northwestern Hawaiian Islands

    Science.gov (United States)

    Shope, James B.; Storlazzi, Curt D.; Hoeke, Ron K.

    2017-10-01

    Atoll islands are dynamic features that respond to seasonal alterations in wave conditions and sea level. It is unclear how shoreline wave run-up and erosion patterns along these low elevation islands will respond to projected sea-level rise (SLR) and changes in wave climate over the next century, hindering communities' preparation for the future. To elucidate how these processes may respond to climate change, extreme boreal winter and summer wave conditions under future sea-level rise (SLR) and wave climate scenarios were simulated at two atolls, Wake and Midway, using a shallow-water hydrodynamic model. Nearshore wave conditions were used to compute the potential longshore sediment flux along island shorelines via the CERC empirical formula and wave-driven erosion was calculated as the divergence of the longshore drift; run-up and the locations where the run-up exceed the berm elevation were also determined. SLR is projected to predominantly drive future island morphological change and flooding. Seaward shorelines (i.e., ocean fronted shorelines directly facing incident wave energy) were projected to experience greater erosion and flooding with SLR and in hypothetical scenarios where changes to deep water wave directions were altered, as informed by previous climate change forced Pacific wave modeling efforts. These changes caused nearshore waves to become more shore-normal, increasing wave attack along previously protected shorelines. With SLR, leeward shorelines (i.e., an ocean facing shoreline but sheltered from incident wave energy) became more accretive on windward islands and marginally more erosive along leeward islands. These shorelines became more accretionary and subject to more flooding with nearshore waves becoming more shore-normal. Lagoon shorelines demonstrated the greatest SLR-driven increase in erosion and run-up. They exhibited the greatest relative change with increasing wave heights where both erosion and run-up magnitudes increased. Wider

  17. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities -- 1995. Annual report 1995

    International Nuclear Information System (INIS)

    Martinson, R.D.; Graves, R.J.; Langeslay, M.J.; Killins, S.D.

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams

  18. Cumulative impacts of hydroelectric development on the fresh water balance in Hudson Bay

    International Nuclear Information System (INIS)

    Anctil, F.; Couture, R.

    1994-01-01

    A study is presented of the impacts of hydroelectric development on the surface water layer of Hudson Bay, including James Bay and the Foxe Basin. These impacts are directly related to the modifications in the fresh water balance of Hudson Bay and originate from the management of hydroelectric complexes. The fresh water balance is determined by identifying, at different scales, the modifications caused by each complex. The main inputs are the freezing and thawing of the ice cover, runoff water, and mass exchange at the air-water interface. Three spatial scales were used to obtain the resolution required to document the cumulative effects of fresh water balance modifications on the water surface layer, one each for Hudson Bay, Hudson Strait, and the Labrador Sea. Finally, the addition of the proposed Great Whale hydroelectric complex is examined from the available information and forecasts. 18 refs,. 6 figs., 1 tab

  19. Aspects of the relations between the hydroelectric constructions and environment

    International Nuclear Information System (INIS)

    Michael, I.

    1993-01-01

    By their dimensions hydroelectric constructions constitute one of the evident examples of man's action upon nature, with favorable as well as unfavorable effects. By using past experience, such effects can be correctly establish and evaluated both by specialists from different fields and by representatives of the local population. The paper proposes several criteria for qualitative characterization of such effects. Some favorable and unfavorable effects of dams, lakes, secondary catchment and derivations are discussed. Also, having in view the water flow distribution which would allow a normal insertion of such construction in the environment, despite of some power production diminish diminishing, two proposals are made concerning possible solutions for secondary catchment and the hydroelectric power stations situated in the upper zones of the rivers. (author). 5 refs

  20. Testing of an acoustic smolt deflection system, Blantyre hydroelectric power scheme

    International Nuclear Information System (INIS)

    1996-01-01

    The aim of this study was to test the effectiveness of an underwater acoustic barrier as a means of preventing the entry of salmon (Salmo salar) and sea trout (Salmo trutta) smolts and other fish into the water intake of a hydro-electric power (HEP) station. A secondary objective was to measure the injury rate of fish passed through the turbine, so that the risk to any fish that penetrated the acoustic barrier could also be determined. The test site, which was a 575kW Kaplan plant located at Blantyre on the R. Clyde, Lanarkshire, was selected as being representative of run-of-river sites currently being developed under the Government's NFFO (Non-Fossil Fuel Obligation) and SRO (Scottish Renewables Order) schemes. A further objective was to disseminate information arising from the project to the scientific and HEP community. (author)

  1. Development of a major hydroelectric project in the Pacific Rim

    International Nuclear Information System (INIS)

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  2. EDIN-USVI Clean Energy Quarterly: Volume 1, Issue 2, March 2011, Energy Development in Island Nations, U.S. Virgin Islands (Newsletter)

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-01

    This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and project-related renewable energy and energy efficiency projects.

  3. The evolving policy regime for pumped storage hydroelectricity in China: A key support for low-carbon energy

    International Nuclear Information System (INIS)

    Zhang, Sufang; Andrews-Speed, Philip; Perera, Pradeep

    2015-01-01

    Highlights: • Highlights the role of pumped storage hydroelectricity in renewable energy integration. • Examines the development of pumped storage hydroelectricity in China. • Reviews the regulatory policies on pumped storage hydroelectricity in China. • Analyzes the operation and pricing regime for pumped storage hydroelectricity in China. • Makes policy recommendations for promoting pumped storage hydroelectricity in China. - Abstract: As part of its energy transition strategy, China has set ambitious targets for increasing the contribution of renewable energy and, in particular, of wind power. However, the Chinese power sector has not undergone the necessary reforms to facilitate the integration and absorption of a larger share of variable renewable energy. This is evident from the difficulties in absorbing wind power from already commissioned wind farms and the resultant curtailment of wind power. Pumped storage hydroelectricity (PSH) is a flexible power source that can facilitate higher penetration levels of wind power as well as complement China’s growing nuclear power capacity. However, regulatory policy constraints have restricted the effective utilization of existing PSH capacity and discouraged investment in new PSH capacity. This paper examines these constraints and assesses the likely impact of new policies designed to address them. Finally, policy recommendations and concluding remarks are provided. This paper contributes to the literature on renewable energy integration from a new perspective. The lessons from China are relevant to other countries going through the energy transition

  4. Local protest and resistance to the Rupert Diversion Project, Northern Quebec

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, M.; Mulrennan, M.E. [Concordia Univ., Montreal, PQ (Canada). Dept. of Geography, Planning and Environment

    2009-12-15

    The political strategies used by Nemaska Crees to defend their land and way of life against a hydroelectric project located in northern Quebec were discussed. The case study was based on a literature review and field research conducted over a 2-year period with the Nemaska Cree community in eastern James Bay. Social and environmental assessments were not required when the original hydroelectric project was constructed in the region in 1971. An injunction on the project was sought by the Crees and Inuits in 1972, in which the Crees and Inuit successfully won access rights to resources and wildlife harvesting under a 3-tiered land regime. A later agreement for an expansion of the project signed in secrecy by Cree leaders was rejected by other members of the Cree community as the decision-making process occurred 3 years before the environmental impacts assessment took place. The local opposition group is comprised of Native leaders and environmental activists dedicated to increasing awareness about the potential impacts of the hydroelectric project. Strategies used by the group have included protest walks; confrontations with the regional Cree leadership; forming alliances with other activist groups; promoting wind energy; using information and communication technologies to support protest efforts; engaging with the public consultation process; and identifying weaknesses and gaps in technical and environmental impact studies. It was concluded that the strategies have resulted in increased media coverage and public awareness. 57 refs., 1 fig.

  5. 75 FR 70226 - Mackay Bar Corporation; Notice of Authorization for Continued Project Operation

    Science.gov (United States)

    2010-11-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3041-004] Mackay Bar... Mackay Bar Corporation, licensee for the Hettinger Hydroelectric Project, filed an Application to..., notice is hereby given that an annual license for Project No. 3041 is issued to the Mackay Bar...

  6. A summary of water chemistry changes following hydroelectric development in northern Manitoba, Canada

    International Nuclear Information System (INIS)

    Williamson, D.A.; Ralley, W.E.

    1993-01-01

    A detailed summary is provided from five major water quality studies undertaken in northern Manitoba to assess the effects of hydroelectric projects on water quality. Physical changes occurring with the area affected by both the Churchill River diversion and Lake Winnipeg regulation have led to water quality changes in many cases. Phosphorus appeared to increase at some sites while decreasing at others, reflecting a new balance between erosion of new P sources and later uptake or deposition. Color declined at all sites except at Red Head Rapids. Turbidity increased in Southern Indian Lake and in the Burntwood River at Thompson in response to the Churchill diversion, but turbidity has historically exceeded drinking water quality objectives. It is unclear whether the observed changes in water chemistry may have the potential to directly impact aquatic life and wildlife. A major limitation of the water quality data set is the lack of pre-development data for many of the trace elements analyzed. Relative to an upstream reference site, concentrations of Cu, Pb, and Zn were slightly higher at some sites affected by hydroelectric development, but it is not known whether this condition existed prior to development. Exceedances of water quality objectives for some trace elements occurred intermittently at some sites but it is not possible to determine whether these exceedances occurred infrequently historically as a result of natural variability. 34 refs., 1 fig., 13 tabs

  7. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  8. Sub-Saharan hydroelectric power development potential

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1991-01-01

    Though evidencing a power demand which is amongst the lowest in the world, the sub-Saharan regions of Africa are blessed with an enormous hydroelectric power resource potential, which, if suitably developed and tapped, may become a source of economic electric energy for Europe. With the aid of numerous statistical supply and demand data, this paper surveys the marketing potential of this energy source in Africa. The analysis of future development prospects is carried out with reference to the local socio-economic framework

  9. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  10. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  11. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  12. Statistically downscaled climate projections to support evaluating climate change risks for hydropower

    International Nuclear Information System (INIS)

    Brekke, L.

    2008-01-01

    This paper described a web-served public access archive of down-scaled climate projections developed as a tool for water managers of river and hydropower systems. The archive provided access to climate projection data at basin-relevant resolution and included an extensive compilation of down-scale climate projects designed to support risk-based adaptation planning. Downscaled translations of 112 contemporary climate projections produced using the World Climate Research Program's coupled model intercomparison project were also included. Datasets for the coupled model included temperature and precipitation, monthly time-steps, and geographic coverage for the United States and portions of Mexico and Canada. It was concluded that the archive will be used to develop risk-based studies on shifts in seasonal patterns, changes in mean annual runoff, and associated responses in water resources and hydroelectric power management. Case studies demonstrating reclamation applications of archive content and potential applications for hydroelectric power production impacts were included. tabs., figs

  13. Social-ecological resilience of communities displaced by hydroelectric dams in the Amazon: the case of Nova Mutum Paraná, Rondônia

    Directory of Open Access Journals (Sweden)

    Berenice Perpetua Simão

    2016-11-01

    Full Text Available This paper presents an interdisciplinary study of processes of adaptation and cultural resilience in situations of displacement and forced relocation of social groups for hydroelectric dams in the Amazon. We present results of participatory research carried out among the Nova Mutum Paraná community in Rondônia, after forced displacement and resettlement due to the construction of the Jirau hydroelectric plant. The theoretical approach integrates concepts from theories of complex social-ecological systems with approaches from anthropology of development. Methods included participant observation, participatory workshops and focus groups, conducted for nearly three years immediately after community relocation. We analyzed social re-organization and strategies of negotiation between the community and the construction company, related to access to two spaces of cultural importance for leisure: natural bathing area and soccer field. Results suggest that the social capital existing in the community in the early stages of planning and decision making for the construction of hydroelectric projects is a critical factor for negotiating mitigation actions. The involvement and support of municipal representatives was also an important element for strengthening community social organization. Despite the obstacles and difficulties, the community persists in reconstructing their social and common living spaces, seeking to maintain their historical roots through the habits and customs practiced in the pre-displacement riverine site.

  14. The critical role of islands for waterbird breeding and foraging habitat in managed ponds of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    Science.gov (United States)

    Ackerman, Joshua T.; Hartman, C. Alex; Herzog, Mark P.; Smith, Lacy M.; Moskal, Stacy M.; De La Cruz, Susan E. W.; Yee, Julie L.; Takekawa, John Y.

    2014-01-01

    The South Bay Salt Pond Restoration Project aims to restore 50–90 percent of former salt evaporation ponds into tidal marsh in South San Francisco Bay, California. However, large numbers of waterbirds use these ponds annually as nesting and foraging habitat. Islands within ponds are particularly important habitat for nesting, foraging, and roosting waterbirds. To maintain current waterbird populations, the South Bay Salt Pond Restoration Project plans to create new islands within former salt ponds in South San Francisco Bay. In a series of studies, we investigated pond and individual island attributes that are most beneficial to nesting, foraging, and roosting waterbirds.

  15. A modelling methodology for assessing the impact of climate variability and climatic change on hydroelectric generation

    International Nuclear Information System (INIS)

    Munoz, J.R.; Sailor, D.J.

    1998-01-01

    A new methodology relating basic climatic variables to hydroelectric generation was developed. The methodology can be implemented in large or small basins with any number of hydro plants. The method was applied to the Sacramento, Eel and Russian river basins in northern California where more than 100 hydroelectric plants are located. The final model predicts the availability of hydroelectric generation for the entire basin provided present and near past climate conditions, with about 90% accuracy. The results can be used for water management purposes or for analyzing the effect of climate variability on hydrogeneration availability in the basin. A wide range of results can be obtained depending on the climate change scenario used. (Author)

  16. Research methods of Talking About The Smokes: an International Tobacco Control Policy Evaluation Project study with Aboriginal and Torres Strait Islander Australians.

    Science.gov (United States)

    Thomas, David P; Briggs, Viki L; Couzos, Sophia; Davey, Maureen E; Hunt, Jennifer M; Panaretto, Kathryn S; van der Sterren, Anke E; Stevens, Matthew; Nicholson, Anna K; Borland, Ron

    2015-06-01

    To describe the research methods and baseline sample of the Talking About The Smokes (TATS) project. The TATS project is a collaboration between research institutions and Aboriginal community-controlled health services (ACCHSs) and their state and national representative bodies. It is one of the studies within the International Tobacco Control Policy Evaluation Project, enabling national and international comparisons. It includes a prospective longitudinal study of Aboriginal and Torres Strait Islander smokers and recent ex-smokers; a survey of non-smokers; repeated cross-sectional surveys of ACCHS staff; and descriptions of the tobacco policies and practices at the ACCHSs. Community members completed face-to-face surveys; staff completed surveys on paper or online. We compared potential biases and the distribution of variables common to the main community baseline sample and unweighted and weighted results of the 2008 National Aboriginal and Torres Strait Islander Social Survey (NATSISS). The baseline survey (Wave 1) was conducted between April 2012 and October 2013. 2522 Aboriginal and Torres Strait Islander people in 35 locations (the communities served by 34 ACCHSs and one community in the Torres Strait), and 645 staff in the ACCHSs. Sociodemographic and general health indicators, smoking status, number of cigarettes smoked per day and quit attempts. The main community baseline sample closely matched the distribution of the Aboriginal and Torres Strait Islander population in the weighted NATSISS by age, sex, jurisdiction and remoteness. There were inconsistent differences in some sociodemographic factors between our sample and the NATSISS: our sample had higher proportions of unemployed people, but also higher proportions who had completed Year 12 and who lived in more advantaged areas. In both surveys, similar percentages of smokers reported having attempted to quit in the past year, and daily smokers reported similar numbers of cigarettes smoked per day. The

  17. Problems of small hydroelectric power plants - SHP: the example of Sao Paulo State, Brazil; Problematica de desenvolvimento das pequenas centrais hidreletricas-PCH: o exemplo do Estado de Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Matajs, R.R. [Sao Paulo Univ., SP (Brazil). Programa Interunidades de Pos-Graduacao em Energia; Fabrizy, M.P. [Sao Paulo Univ., SP (Brazil). Inst. de Eletrotecnica e Energia

    1994-07-01

    This paper presents a survey of the small hydroelectric potential in the State of Sao Paulo - Brazil. Three projections will be presented as as attempt to show the possible participation of the SHP in a sort, medium and long term, in the State of Sao Paulo energetic matrix.

  18. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1999-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  19. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  20. Surveillance of environmental risks for the health in the area of the construction of hydroelectric project Porce ll, Antioquia Colombia 1997 -2000

    International Nuclear Information System (INIS)

    Gonzalez P, Claudia; Rios V Claudia; Osorio Q, Lisardo; Valencia Lia, Marta; Escobar V, Juan Pablo; Lopez A, Yolanda

    2002-01-01

    The effects on the health of the human populations generated by the construction of dams for the energy production, not always have been considered when the construction of the work is planned. Van Thiel (1962), Gartrell et al. (1972), Ackerman et al. (1973), Brown and Deom (1973), Waddy (1973, 1975), Stanley and Alpers (1975), Worthington (1978), Eguniwe (1976) y Paiva (1982). This study pilot in the country watched during four years the environmental conditions of risk for the health in the hydroelectric project Porce ll during its construction and the pertinent measures were recommended, to protect the conditions of health of the population worker and the inhabitants of the area of influence of this one. In periodic form, the work camping, work fronts and medical centers were inspected. The main problem observed through the time was related to the deficient processes of washing and disinfections in the sanitary services and restaurants and the presence of diverse vectors breeding place of diseases, appearing greater problem in the rims in disuse and carps that were used to cover the structures and equipment that was stored outdoors. Most of the factors of risk for the health they were corrected Colombia. Through the time and in so me it was necessary to insist on the given recommendations

  1. The influence of changes in lifestyle and mercury exposure in riverine populations of the Madeira River (Amazon Basin) near a hydroelectric project.

    Science.gov (United States)

    Hacon, Sandra S; Dórea, José G; Fonseca, Márlon de F; Oliveira, Beatriz A; Mourão, Dennys S; Ruiz, Claudia M V; Gonçalves, Rodrigo A; Mariani, Carolina F; Bastos, Wanderley R

    2014-02-26

    In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents) that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615) and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001) in less isolated communities near to the capital of Porto Velho (median 2.32 ppm) than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm). Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  2. Community-based participatory research projects and policy engagement to protect environmental health on St Lawrence Island, Alaska

    Directory of Open Access Journals (Sweden)

    Pamela K. Miller

    2013-08-01

    Full Text Available Objectives . This article synthesizes discussion of collaborative research results, interventions and policy engagement for St Lawrence Island (SLI, Alaska, during the years 2000–2012. Methods . As part of on-going community-based participatory research (CBPR studies on SLI, 5 discrete exposure-assessment projects were conducted: (a a biomonitoring study of human blood serum; (b–d 3 investigations of levels of contaminants in environmental media at an abandoned military site at Northeast Cape – using sediment cores and plants, semi-permeable membrane devices and blackfish, respectively; and (e a study of traditional foods. Results . Blood serum in residents of SLI showed elevated levels of polychlorinated biphenyls (PCBs with higher levels among those exposed to the military site at Northeast Cape, an important traditional subsistence-use area. Environmental studies at the military site demonstrated that the site is a continuing source of PCBs to a major watershed, and that clean-up operations at the military site generated PCB-contaminated dust on plants in the region. Important traditional foods eaten by the people of SLI showed elevated concentrations of PCBs, which are primarily derived from the long-range transport of persistent pollutants that are transported by atmospheric and marine currents from more southerly latitudes to the north. Interventions . An important task for all CBPR projects is to conduct intervention strategies as needed in response to research results. Because of the findings of the CBPR projects on SLI, the CBPR team and the people of the Island are actively engaging in interventions to ensure cleanup of the formerly used military sites; reform chemicals policy on a national level; and eliminate persistent pollutants internationally. The goal is to make the Island and other northern/Arctic communities safe for themselves and future generations. Conclusions . As part of the CBPR projects conducted from 2000 to 2012

  3. Mines as lower reservoir of an UPSH (Underground Pumping Storage Hydroelectricity): groundwater impacts and feasibility

    Science.gov (United States)

    Bodeux, Sarah; Pujades, Estanislao; Orban, Philippe; Dassargues, Alain

    2016-04-01

    The energy framework is currently characterized by an expanding use of renewable sources. However, their intermittence could not afford a stable production according to the energy demand. Pumped Storage Hydroelectricity (PSH) is an efficient possibility to store and release electricity according to the demand needs. Because of the topographic and environmental constraints of classical PSH, new potential suitable sites are rare in countries whose topography is weak or with a high population density. Nevertheless, an innovative alternative is to construct Underground Pumped Storage Hydroelectricity (UPSH) plants by using old underground mine works as lower reservoir. In that configuration, large amount of pumped or injected water in the underground cavities would impact the groundwater system. A representative UPSH facility is used to numerically determine the interactions with surrounding aquifers Different scenarios with varying parameters (hydrogeological and lower reservoir characteristics, boundaries conditions and pumping/injection time-sequence) are computed. Analysis of the computed piezometric heads around the reservoir allows assessing the magnitude of aquifer response and the required time to achieve a mean pseudo-steady state under cyclic solicitations. The efficiency of the plant is also evaluated taking the leakage into the cavity into account. Combining these two outcomes, some criterions are identified to assess the feasibility of this type of projects within potential old mine sites from a hydrogeological point of view.

  4. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos.

    Science.gov (United States)

    Hiscox, Alexandra; Kaye, Angela; Vongphayloth, Khamsing; Banks, Ian; Piffer, Michele; Khammanithong, Phasouk; Sananikhom, Pany; Kaul, Surinder; Hill, Nigel; Lindsay, Steven W; Brey, Paul T

    2013-06-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were most common in water storage jars (odds ratio [OR] = 4.72) and tires (OR = 2.99), and Ae. albopictus pupae were associated with tires in 2009 (OR = 10.87) and drums, tires, and jars in 2010 (drums OR = 3.05; tires OR = 3.45, jars OR = 6.59). Compared with water storage vessels, containers used for hygiene, cooking, and drinking were 80% less likely to harbor Ae. albopictus pupae in 2010 (OR = 0.20), and discarded waste was associated with a 3.64 increased odds of infestation. Vector control efforts should focus on source reduction of water storage containers, particularly concrete jars and tires.

  5. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  6. The integrated hydroelectric uses in brazilian agricultural projects

    International Nuclear Information System (INIS)

    Martinez, M.L.B.; Violin, A.; Martinez, C.B.; Lima, C.M.B.

    1990-01-01

    This work aims to analyse the advances for the implementation of PCH's in agricultural projects, and advice of interconnection with the local sub-transmission system, in order to maximize the return of the installation investing capital. Also a study case is presented. (author)

  7. Projected lifetime cancer risks from exposure to regional radioactive fallout in the Marshall Islands.

    Science.gov (United States)

    Land, Charles E; Bouville, André; Apostoaei, Iulian; Simon, Steven L

    2010-08-01

    Radioactive fallout from nuclear test detonations during 1946-1958 at Bikini and Enewetak Atolls in the Marshall Islands (MI) exposed populations living elsewhere in the MI archipelago. A comprehensive analysis, presented in seven companion papers, has produced estimates of tissue-specific radiation absorbed dose to MI residents at all historically inhabited atolls from internal (ingested) and external irradiation resulting from exposure to radioactive fallout, by calendar year, and by age of the population at time of exposure. The present report deals, for the first time, with the implications of these doses for cancer risk among exposed members of the MI population. Radiation doses differed by geographic location and year of birth, and radiation-related cancer risk depends upon age at exposure and age at observation for risk. Using dose-response models based on committee reports published by the National Research Council and the National Institutes of Health, we project that, during the lifetimes of members of the MI population potentially exposed to ionizing radiation from weapons test fallout deposited during the testing period (1948-1958) and from residual radioactive sources during the subsequent 12 y (1959-1970), perhaps 1.6% (with 90% uncertainty range 0.4% to 3.4%) of all cancers might be attributable to fallout-related radiation exposures. By sub-population, the projected proportion of cancers attributable to radiation from fallout from all nuclear tests conducted in the Marshall Islands is 55% (28% to 69%) among 82 persons exposed in 1954 on Rongelap and Ailinginae, 10% (2.4% to 22%) for 157 persons exposed on Utrik, and 2.2% (0.5% to 4.8%) and 0.8% (0.2% to 1.8%), respectively, for the much larger populations exposed in mid-latitude locations including Kwajalein and in southern locations including Majuro. By cancer type, point estimates of attributable risk varied, by location, between 12% and 95% for thyroid cancer, between 2% and 78% for leukemia, and

  8. Forces in the development of remote islands in Japan : A case study of local energy enterprises in Tsushima Island

    OpenAIRE

    Matsumura, Yuko; Miyoshi, Emako

    2018-01-01

    Japan, one of the most famous islander nations in the world, has promoted the development of its remote islands for over 60 years after the Second World War. The target islands and projects for fostering development have been steadily expanded. However, the country is facing serious socio-economic challenges such as aging and recession, resulting in less available funding for preferential treatment to remote islands. Thus, the framework for boosting island development should be reconsidered, ...

  9. Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willer, D.C.

    1979-04-23

    A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse adjacent to the existing dam. The funding sources considered were the Department of Energy loan program, the United States Bureau of Reclamation PL-984 loan program and conventional revenue bonds, both taxable and tax-exempt. The optimal project alternative was determined to be the apron-mounted configuration. The final choice of funding would be dependent on the power purchaser. It was shown that, regardless of the configuraton or funding source selected, the project would be feasible. The cost of the apron-mounted configuration, which would consist of four turbine-generator units for a total installed capacity of 9.76 MW, was estimated as $13,250,000 with financing provided by either a PL-984 loan or tax-exempt bonds. The cost per installed kilowatt was therefore $1,350, and the cost per kilowatt-hour was 19.6 mills. The average annual energy was estimated to be 56.44 million kWh, the equivalent of approximately 87,000 barrels of oil per y. It is therefore recommended that the Montana Department of Natural Resources and Conservation proceed with the project and that discussions be initiated with potential power purchasers as soon as possible.

  10. Fish entrainment and mortality at the French Landing Hydroelectric Powerhouse

    International Nuclear Information System (INIS)

    Sundquist, M.J.

    1991-01-01

    This paper is a case study which explains the fish mortality study performed and results obtained at an existing hydroelectric powerhouse in Michigan. Undertaken in 1989 and 1990, this study provides data for determining effects of turbine passage on area fish

  11. Long Island Solar Farm

    Energy Technology Data Exchange (ETDEWEB)

    Anders, R.

    2013-05-01

    The Long Island Solar Farm (LISF) is a remarkable success story, whereby very different interest groups found a way to capitalize on unusual circumstances to develop a mutually beneficial source of renewable energy. The uniqueness of the circumstances that were necessary to develop the Long Island Solar Farm make it very difficult to replicate. The project is, however, an unparalleled resource for solar energy research, which will greatly inform large-scale PV solar development in the East. Lastly, the LISF is a superb model for the process by which the project developed and the innovation and leadership shown by the different players.

  12. The geology of the Falkland Islands

    OpenAIRE

    Aldiss, D.T.; Edwards, E.J.

    1999-01-01

    This report is complementary to the 1:250 000 scale geological map of the Falkland Islands compiled in 1998. The report and map are products of the Falkland Islands Geological Mapping Project (1996-1998). Geological observation and research in the Islands date from 1764. The Islands were visited during two pioneering scientific cruises in the 19th century. Subsequently, many scientists visited en route to the Antarctic or Patagonia. Geological affinities to other parts of the sout...

  13. Renewable Energy Project Financing: Improved Guidance and Information Sharing Needed for DOD Project-Level Officials

    Science.gov (United States)

    2012-04-01

    certain energy related military construction projects. The Navy used this authority for its geothermal plant at Naval Air Weapons Station China Lake...electric energy generated from solar, wind, biomass, landfill gas, ocean (including tidal, wave, current, and thermal), geothermal , municipal solid...thermal; geothermal , including electricity and heat pumps; municipal solid waste; new hydroelectric generation capacity achieved from increased

  14. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  15. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico.

    Science.gov (United States)

    Dalyander, P Soupy; Meyers, Michelle; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark; Ford, Mark

    2016-12-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a

  16. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico

    Science.gov (United States)

    Dalyander, P. Soupy; Meyers, Michelle B.; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark R.; Ford, Mark

    2016-01-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a

  17. "Island Project" Gdanskis = "Island Project" in Gdansk / Leonhard Lapin

    Index Scriptorium Estoniae

    Lapin, Leonhard, 1947-

    1995-01-01

    24.05.- 12.06.1994.a. toimus Poolas Gdanski linnas Baltimeremaade workshop ja näitus teemal "Islandi project". 22 arhitekti ja kunstnikku 10 riigist üritasid kas arhitektuursete või kujutava kunsti vahenditega leida lahendusi linna keskel jões paiknevale Wyspa saarele kultuurikeskkonna rajamiseks

  18. Renewable energy projects in small island countries funded under the United Nation trust found for new and renewable source of energy (NRSE)

    International Nuclear Information System (INIS)

    Gururaja, J.

    1999-01-01

    The NRSE trust fund established with financial support from the Italian Government has succeeded in catalyzing a number of energy projects in small island developing countries. These projects have elicited a great deal of interest by local communities and opened up prospects for further utilization of locally available energy resources. The projects have created a positive impact on the quality of life of people in dispersed locations in small island developing countries by focusing on provision of renewable energy based electricity services such as solar PV lighting for homes, schools, and hospitals; radio, TV, VCR as well as medicine refrigerators. Thus it has become evident that renewable energy technologies such as solar and wind systems can have an important role to play in improving the quality of life of people in these small island countries. Market potential for these technologies is indeed substantial. However constraints and barriers still exist. One of the principal barriers is still the high initial cost of solar devices. Innovative financing including microcredit facilities needs to be explored. Efforts are also needed to strengthen local capacity to undertake assembly of components and systems, and also in the installation, maintenance, and service of renewable energy devices. Entrepreneurial activities need to be fostered through further strengthening of skills in this area. (EHS)

  19. Renewable energy projects in small island countries funded under the United Nation trust found for new and renewable source of energy (NRSE)

    Energy Technology Data Exchange (ETDEWEB)

    Gururaja, J. [Energy and Transport Branch, Division for Sustainabel Development, Department of Economic and Social Affairs, United Nations, NY (United States)

    1999-11-01

    The NRSE trust fund established with financial support from the Italian Government has succeeded in catalyzing a number of energy projects in small island developing countries. These projects have elicited a great deal of interest by local communities and opened up prospects for further utilization of locally available energy resources. The projects have created a positive impact on the quality of life of people in dispersed locations in small island developing countries by focusing on provision of renewable energy based electricity services such as solar PV lighting for homes, schools, and hospitals; radio, TV, VCR as well as medicine refrigerators. Thus it has become evident that renewable energy technologies such as solar and wind systems can have an important role to play in improving the quality of life of people in these small island countries. Market potential for these technologies is indeed substantial. However constraints and barriers still exist. One of the principal barriers is still the high initial cost of solar devices. Innovative financing including microcredit facilities needs to be explored. Efforts are also needed to strengthen local capacity to undertake assembly of components and systems, and also in the installation, maintenance, and service of renewable energy devices. Entrepreneurial activities need to be fostered through further strengthening of skills in this area. (EHS)

  20. Evaluation methodology for flood damage reduction by preliminary water release from hydroelectric dams

    Science.gov (United States)

    Ando, T.; Kawasaki, A.; Koike, T.

    2017-12-01

    IPCC AR5 (2014) reported that rainfall in the middle latitudes of the Northern Hemisphere has been increasing since 1901, and it is claimed that warmer climate will increase the risk of floods. In contrast, world water demand is forecasted to exceed a sustainable supply by 40 percent by 2030. In order to avoid this expectable water shortage, securing new water resources has become an utmost challenge. However, flood risk prevention and the secure of water resources are contradictory. To solve this problem, we can use existing hydroelectric dams not only as energy resources but also for flood control. However, in case of Japan, hydroelectric dams take no responsibility for it, and benefits have not been discussed accrued by controlling flood by hydroelectric dams, namely by using preliminary water release from them. Therefore, our paper proposes methodology for assessing those benefits. This methodology has three stages as shown in Fig. 1. First, RRI model is used to model flood events, taking account of the probability of rainfall. Second, flood damage is calculated using assets in inundation areas multiplied by the inundation depths generated by that RRI model. Third, the losses stemming from preliminary water release are calculated, and adding them to flood damage, overall losses are calculated. We can evaluate the benefits by changing the volume of preliminary release. As a result, shown in Fig. 2, the use of hydroelectric dams to control flooding creates 20 billion Yen benefits, in the probability of three-day-ahead rainfall prediction of the assumed maximum rainfall in Oi River, in the Shizuoka Pref. of Japan. As the third priority in the Sendai Framework for Disaster Risk Reduction 2015-2030, `investing in disaster risk reduction for resilience - public and private investment in disaster risk prevention and reduction through structural and non-structural measures' was adopted. The accuracy of rainfall prediction is the key factor in maximizing the benefits

  1. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    Science.gov (United States)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  2. Hydroacoustic modelling and numerical simulation of unsteady operation of hydroelectric systems[Dissertation 3713

    Energy Technology Data Exchange (ETDEWEB)

    Nicolet, Ch.

    2007-03-15

    presented. The model provides the RSI pressure fluctuation patterns in the vaneless gap and enables to predict standing waves in the spiral case and adduction pipe. The proposed one-dimensional modelling approach enables the simulation, analysis and optimization of the dynamic behavior of hydroelectric power plants. The approach has proven its capability of simulating properly both transient and periodic phenomena. Such investigations can be undertaken at early stages of a project to assess the possible dynamic problems and to select appropriate solutions ensuring the safest and optimal operation of the facility. (author)

  3. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930)

    OpenAIRE

    Mortati, Débora Marques de Almeida Nogueira; Argollo Ferrão, André Munhoz de

    2011-01-01

    The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The el...

  4. Future wave and wind projections for United States and United-States-affiliated Pacific Islands

    Science.gov (United States)

    Storlazzi, Curt D.; Shope, James B.; Erikson, Li H.; Hegermiller, Christine A.; Barnard, Patrick L.

    2015-01-01

    Changes in future wave climates in the tropical Pacific Ocean from global climate change are not well understood. Spatially and temporally varying waves dominate coastal morphology and ecosystem structure of the islands throughout the tropical Pacific. Waves also impact coastal infrastructure, natural and cultural resources, and coastal-related economic activities of the islands. Wave heights, periods, and directions were forecast through the year 2100 using wind parameter outputs from four atmosphere-ocean global climate models from the Coupled Model Inter-Comparison Project, Phase 5, for Representative Concentration Pathways (RCP) scenarios 4.5 and 8.5 that correspond to moderately mitigated and unmitigated greenhouse gas emissions, respectively. Wind fields from the global climate models were used to drive a global WAVEWATCH-III wave model and generate hourly time-series of bulk wave parameters for 25 islands in the mid to western tropical Pacific for the years 1976–2005 (historical), 2026–2045 (mid-century projection), and 2085–2100 (end-of-century projection). Although the results show some spatial heterogeneity, overall the December-February extreme significant wave heights, defined as the mean of the top 5 percent of significant wave height time-series data modeled within a specific period, increase from present to mid-century and then decrease toward the end of the century; June-August extreme wave heights increase throughout the century within the Central region of the study area; and September-November wave heights decrease strongly throughout the 21st century, displaying the largest and most widespread decreases of any season. Peak wave periods increase east of the International Date Line during the December-February and June-August seasons under RCP4.5. Under the RCP8.5 scenario, wave periods decrease west of the International Date Line during December-February but increase in the eastern half of the study area. Otherwise, wave periods decrease

  5. The Influence of Changes in Lifestyle and Mercury Exposure in Riverine Populations of the Madeira River (Amazon Basin near a Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Sandra S. Hacon

    2014-02-01

    Full Text Available In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615 and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001 in less isolated communities near to the capital of Porto Velho (median 2.32 ppm than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm. Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  6. Carbon emission as a function of energy generation in hydroelectric reservoirs in Brazilian dry tropical biome

    International Nuclear Information System (INIS)

    Ometto, Jean P.; Cimbleris, André C.P.; Santos, Marco A. dos; Rosa, Luiz P.; Abe, Donato; Tundisi, José G.; Stech, José L.; Barros, Nathan; Roland, Fábio

    2013-01-01

    Most energy generation globally is fueled by coal and oil, raising concerns about greenhouse gas emissions. Hydroelectric reservoirs are anthropogenic aquatic systems that occur across a wide geographical extent, and, in addition to their importance for energy production, they have the potential to release two important greenhouse gases (GHGs), carbon dioxide and methane. We report results from an extensive study of eight hydroelectric reservoirs located in central and southeastern tropical Brazil. In the Brazilian dry tropical biome reservoirs, emissions (in tons of CO 2 Eq. per MW h) varied from 0.01 to 0.55, and decreased with reservoir age. Total emissions were higher in the reservoir lake when compared to the river downstream the dam; however, emissions per unit area, in the first kilometer of the river after the dam, were higher than that in the reservoir. The results showed, despite higher carbon emissions per energy production in the youngest reservoirs, lower emission from hydroelectric reservoirs from the studied region in relation to thermo electrical supply, fueled by coal or fossil fuel. The ratio emission of GHG per MWh produced is an important parameter in evaluating the service provided by hydroelectric reservoir and for energy planning policies. - Highlights: ► Hydroelectric reservoirs construction is growing worldwide. ► The effect of hydropower reservoir in the carbon cycle is dependent on environment characteristics. ► Carbon emissions per energy production are higher in the youngest tropical savannah reservoirs. ► Methane emissions decrease with reservoir age in tropical savannah reservoirs. ► In general, the effect of hydropower in the carbon cycle is lower than other energy sources

  7. Proceedings of a workshop on dealing with uncertainties in the hydroelectric energy business. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-01-01

    This workshop was attended by experts in Canadian and international hydroelectric utilities to exchange information on current practices and opportunities for improvement or future cooperation. The discussions focused on reducing the uncertainties associated with hydroelectric power production. Although significant improvements have been made in the efficiency, reliability and safety of hydroelectric power production, the sector is still challenged by the uncertainty of water supply which depends greatly on weather conditions. Energy markets pose another challenge to power producers in terms of energy supply, energy demand and energy prices. The workshop focused on 3 themes: (1) weather and hydrologic uncertainty, (2) market uncertainty, and (3) decision making models using uncertainty principles surrounding water resource planning and operation. The workshop featured 22 presentations of which 11 have been indexed separately for inclusion in this database. refs., tabs., figs

  8. Stabilization of the dyke on the north bank of the La Grande 1 hydroelectric complex

    International Nuclear Information System (INIS)

    Massiera, M.; Tournier, J-P.

    2000-01-01

    Special design features required in constructing a 2444 m long dyke on the north bank of the La Grade River at the site of the La Grande 1 hydroelectric power project are described. The special features involved construction of a downstream bank and upstream stabilization berms to avoid the occurrence of potentially dangerous retrogressive slides. These special features were deemed essential due to the presence of sensitive marine clay, covered with deltaic sand and silt and river sand deposits. The paper highlights the geotechnical and hydrogeological conditions of the northern terrace, and describes the different construction phases of stabilizing the river bank. Control of groundwater pressures in the lower aquifer with relief wells is emphasized. 9 refs., 1 tab., 17 figs

  9. Expanding the functional significance of automated control systems for the production process at hydroelectric plants

    International Nuclear Information System (INIS)

    Vasil'ev, Yu.S.; Kononova, M.Yu.

    1993-01-01

    Automated control systems for the production process (ACS PP) have been successfully implemented in a number of hydroelectric plants in the Russian Federation. The circle of problems that can be solved using ACS PP can be conditionally divided into two classes: on-line/technological control, and production-technological control. This article describes successes and future directions for the solution of these two classes of problems. From the discussion, it is concluded (1) that the data base for existing ACS PP at hydroelectric plants can be successfully employed as points for monitoring the conservation of an environment of local significance; (2) that is is expedient to discuss the problem with organizations, including local control groups interested in the development of territorial-basin systems for ecological monitoring; and (3) that the initiative in creating local territorial-basin support points for monitoring should emanate from guidelines for hydroelectric plants with ACS PP. 3 refs., 2 figs

  10. Fish & Wildlife Annual Project Summary, 1983.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  11. Measurents of natural radioactivity in an underground hydroelectric power plant

    International Nuclear Information System (INIS)

    Malvicini, Andrea; Esposito, PierLuigi; Depiesse, Danielle

    2008-01-01

    In underground working places, especially when ventilation is not properly regulated, large amounts of natural radioactivity can be found. This can give rise to potential exposures of non-negligible magnitude. Direct measurements of gamma radiation and radon were carried out during excavation works for the construction of an hydroelectric plant in the north of Italy. After the construction of the plant, in order to reduce radon concentrations and to improve ventilation effectiveness, the main entry gate was motorized and automated. Then, in order to find the optimal speed for the fans located in the galleries and in the power plant, radon and airflow velocity were measured. Correlation data between airflow and radon concentrations were found. An automatic regulation system has been set up using air velocity detectors and slightly modifying the software for the control and regulation of the power plant. Measurements must be made in order to identify radon sources and evaluate quantitative contributions as a function of ventilation. Underground hydroelectric plants are provided with entry galleries as well as secondary galleries from which radon coming out from the soil and the walls can exhale in quantities that depend on the contents of 226 Ra in the rocks and in the building materials. Other radon sources are the water coming out from the walls of the galleries and the water in the deep well located at the bottom of the power plant. Geological studies and mathematical models are useful means for the analysis of the relative contributions of the main sources as well as for the prediction of the effects deriving from modifications of the hydroelectric plant ventilation system or resulting from other important structural changes. (author)

  12. Uruguay project - Metalic silicon manufacturing. Palmar location study

    International Nuclear Information System (INIS)

    2003-01-01

    This work is about the Soriano town possibilities offered to Rima Industrial S.A in relation with the metallic silicon project in Uruguay. In this zone there is the Palmar hydroelectric plant with a capacity of 33 MW and its development is part of the Rio Negro river

  13. Etan hydropower project spurs industrial, agricultural growth of region

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Located in Hongdu commune, Xincheng County, Guangxi Zhuang Autonomous Region, on the middle reaches of the Hongshui River, the Etan hydroelectric power station was begun in 1977 and began to generate power in April 1981. The Etan hydroelectric power station is a run-off type, low waterhead medium-sized power station. It has an installed capacity of 60,000 kW for an average yearly power output of 328 million kWh. The main structure of the power station includes a water diversion canal, a water intake gate, a main machinery building and a switching station. The main machinery building is located on the downstream side of the dam on an overhanging cliff. With a construction area of only 5000 m/sup 2/, work was very difficult due to the restricted work area and transportation problems. By strengthening construction management and promoting technical innovation some 670,000 yuan were saved for the state and construction time was accelerated. This assured the completion of the construction and installation of the main parts of the project according to timetables and design requirements. The successful construction of the Etan hydroelectric power station marks another step in amassing experience in the harnessing of the Hongshui River. The project will have a major impact on the growth of industry and agriculture in Guangxi and on the buildup of the minority regions.

  14. Reviving large-scale projects

    International Nuclear Information System (INIS)

    Desiront, A.

    2003-01-01

    For the past decade, most large-scale hydro development projects in northern Quebec have been put on hold due to land disputes with First Nations. Hydroelectric projects have recently been revived following an agreement signed with Aboriginal communities in the province who recognized the need to find new sources of revenue for future generations. Many Cree are working on the project to harness the waters of the Eastmain River located in the middle of their territory. The work involves building an 890 foot long dam, 30 dikes enclosing a 603 square-km reservoir, a spillway, and a power house with 3 generating units with a total capacity of 480 MW of power for start-up in 2007. The project will require the use of 2,400 workers in total. The Cree Construction and Development Company is working on relations between Quebec's 14,000 Crees and the James Bay Energy Corporation, the subsidiary of Hydro-Quebec which is developing the project. Approximately 10 per cent of the $735-million project has been designated for the environmental component. Inspectors ensure that the project complies fully with environmental protection guidelines. Total development costs for Eastmain-1 are in the order of $2 billion of which $735 million will cover work on site and the remainder will cover generating units, transportation and financial charges. Under the treaty known as the Peace of the Braves, signed in February 2002, the Quebec government and Hydro-Quebec will pay the Cree $70 million annually for 50 years for the right to exploit hydro, mining and forest resources within their territory. The project comes at a time when electricity export volumes to the New England states are down due to growth in Quebec's domestic demand. Hydropower is a renewable and non-polluting source of energy that is one of the most acceptable forms of energy where the Kyoto Protocol is concerned. It was emphasized that large-scale hydro-electric projects are needed to provide sufficient energy to meet both

  15. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  16. Energy Self-Sufficient Island

    International Nuclear Information System (INIS)

    Bratic, S.; Krajacic, G.; Duic, N.; Cotar, A.; Jardas, D.

    2011-01-01

    In order to analyze energy self-sufficient island, example of a smaller island, connected to the power system of a bigger island with an undersea cable, was taken. Mounting substation 10/0,4 is situated on the island and for the moment it provides enough electricity using the medium voltage line. It is assumed that the island is situated on the north part of the Adriatic Sea. The most important problem that occurs on the island is the population drop that occurs for a significant number of years, therefore, life standard needs to be improved, and economic development needs to be encouraged immediately. Local authorities to stimulate sustainable development on the island through different projects, to breath in a new life to the island, open new jobs and attract new people to come live there. Because of the planned development and increase of the population, energy projects, planned as a support to sustainable development, and later achievement of the energy self-sufficiency, is described in this paper. Therefore, Rewisland methodology appliance is described taking into the account three possible scenarios of energy development. Each scenario is calculated until year 2030. Also, what is taken into the account is 100% usage of renewable sources of energy in 2030. Scenario PTV, PP, EE - This scenario includes installation of solar photovoltaic modules and solar thermal collectors on the buildings roofs, as well as well as implementation of energy efficiency on the island (replacement of the street light bulbs with LED lightning, replacement of the old windows and doors on the houses, as well as the installation of the thermal insulation). Scenario PV island - This scenario, similarly to the previous one, includes installation of solar photovoltaic modules and solar thermal collectors an the residential buildings, as well as the 2 MW photovoltaic power plant and ''Green Hotel'', a building that satisfies all of its energy needs completely from renewable energy sources

  17. Tanzania - Mafia Island Airport

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation design and subsequent data gathering activities will address the following key research questions: a) Has the Mafia Island Airport Upgrade Project...

  18. Small hydroelectricity at the low point?

    International Nuclear Information System (INIS)

    Mary, Olivier

    2015-01-01

    Small hydroelectricity displays an interesting potential in France (about 1.000 MW), but, as outlined in this article and despite technological advances, this sector is not growing significantly, notably for regulatory reasons: there is no consensus on the impact of these constructions on the environment. The article also outlines that development costs are always higher. These environmental and economic issues result in a transformation of the sector: old and ageing plants owned by individuals are sold to other actors, forms of deregulation are appearing to support the development. In parallel, the article notices that installations depend on their geographical context, and that it is also possible to produce electricity in plains

  19. On the representation of the island in my artwork

    Directory of Open Access Journals (Sweden)

    Astrid Nobel

    2015-05-01

    Full Text Available This essay explores the development of an art project with the island as its central theme. The process is explained through a selection of background material and other considerations that have led to the eventual work. As a starting point for this project, the author worked on the island where she was born and raised: Ameland, The Netherlands. To experience the island from an outsider’s point of view, she also stayed for some time on Grímsey, North Iceland. The work that came forth from this period of experiencing and gathering information around islands, Iland / Us, consists of two sculptures that deal with borders, protection, self and community. Among the selected fragments are texts from literature and science, photos and sketches, alternated with personal island experience.

  20. Dissolved oxygen analysis for hydropower additions on the Illinois River

    International Nuclear Information System (INIS)

    Sundquist, M.J.; Elver, S.A.

    1993-01-01

    The Illinois Waterway is comprised of a system of eight locks along the Illinois River, the Des Plaines River, and the Chicago Sanitary Ship Canal which allow commercial barge traffic between the Mississippi River and Lake Michigan at the City of Chicago. Opportunities for production of hydroelectric power is present at several of these lock and dams. This paper presents the field study and computer simulation conducted to determine the feasibility of constructing hydroelectric powerhouses on two of these lock and dams. So as not to degrade recent improvements to water quality, the Federal Energy Regulatory Commission (FERC), in issuing the construction and operating licenses for these two hydroelectric facilities, requires the hydropower additions to not reduce the dissolved oxygen (D.O.) level downstream of the hydroelectric facilities below 6 parts per million (ppm). Presently, the waterway discharge passes through taintor gates at both of these lock and dam facilities which creates aeration. The addition of hydroelectric powerhouses would divert water from these spillways through generation equipment; consequently, the spillway aeration would not occur. The purpose of the study was to determine the amount of power generation from these facilities, given the existing waterway water quality and the FERC D.O. criteria. A computer simulation generation analysis was conducted to provide a database of the waterway water quality. A four-month extensive field collection survey was conducted over the 63 kilometer (39 mile) reach of the waterway which comprises the two downstream pools of the Brandon Road and Dresden Island projects, and 3 kilometers (2 miles) upstream of the Brandon Road Project. The analysis revealed that the hydroelectric additions were economically feasible and are an example of how the benefits of hydroelectric development can be balanced with environmental concerns

  1. Efficiency analysis of hydroelectric generating plants: A case study for Portugal

    International Nuclear Information System (INIS)

    Barros, Carlos Pestana

    2008-01-01

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of 'best practices'. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  2. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  3. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, David [Sacramento Municipal Unitlity District, Sacramento, CA (United States)

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  4. Coastal Change Processes Project data report for observations near Fire Island, New York, January to April 2012

    Science.gov (United States)

    Armstrong, Brandy N.; Warner, John C.; List, Jeffrey H.; Martini, Marinna A.; Montgomery, Ellyn T.; Voulgaris, George; Traykovski, Peter A.

    2015-01-01

    An oceanographic field study during January through April 2012 investigated processes that control the sediment-transport dynamics near Fire Island, New York. This report describes the project background, field program, instrumentation configuration, and locations of the sensors deploymed. The data collected and supporting meteorological observations are presented as time series plots for data visualization. Additionally, individual, links to the database containing digital data files are available as part of this report.

  5. Hydroelectric power development and the ice regime of inland waters: A northern community perspective

    International Nuclear Information System (INIS)

    Gerard, R.

    1989-03-01

    Inland waters play a vital role in the life of the many small northern communities which depend in large measure on the provisions of the natural environment for their sustenance. These communities are therefore particularly vulnerable to changes in the ice regime of these waters, especially changes that are irregular. However, the north is also the site of much of Canada's hydroelectric power development and potential, developments that have a major influence on the ice regime of effected waters. As a contribution to the background information required for the necessary discussions and negotiations associated with such developments, the various aspects of the natural ice regime, the possible effects of hydroelectric development and operation on this regime, and its consequences, are briefly reviewed. The emphasis has been placed on changes that will likely be of most significance to northern communities in the bedrock-controlled country of the western Canadian Shield. The major direct, and in some circumstances life-threatening, impact of changes to the ice regime is on trafficability of the iceways that play such a vital role in the life of the communities. Hence particular emphasis has been placed on this aspect and on the formation of the slush and thin ice conditions that are the bane of over-ice travel and that are subject to unexpected changes by hydroelectric development and operation. To place these changes and their effects in some perspective, the nature of a hydroelectric development is also briefly described and an effort made to indicate the large costs incurred if these developments are restrained in their operation to avoid or mitigate some of the effects on the ice regime. 31 refs., 57 figs., 1 tab

  6. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    KEYWORDS: Constraints; craftsmen; funds; highlands; hydroelectric. INTRODUCTION ... MATERIAL AND METHODS. 1.1 Physical ... (Bamougoum; Bapi; Batotcha) are due to the use ... water very often escapes from the air vent because of its .... The funds raised will remedy ... Graw-Hill Book Company New York,. USA.

  7. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  8. The creation of reasonable projections toward sustainable development considering the climate and socioeconomic changes in the Pacific Islands

    Science.gov (United States)

    Watanabe, S.; Iida, A.; Nakatani, J.; Noda, K.; Take, M.; Nakamura, S.

    2015-12-01

    The impacts of climate and socioeconomic change in the future are important factors to consider when discussing the issues of sustainable development in the Pacific Islands, since their impacts here are relatively large compared to those in other regions due to the severe limitation of internal resources and the external dependency of the life essentials. The tourism industry is the key driving force behind the economic growth in island region and it is promoted by the environmental attractions. This study constructs scenarios that foresees the effects of these changes and assesses the subsequent impact on both the local community and the tourism industry. In this study, the scenarios have been developed based on the representative concentration pathways (RCPs) and the shared socioeconomic pathways (SSPs). The progress of climate change was expected to affect the attraction of tourists as well as resources availability and food production. The difference of SSPs was expected to affect the quality of life in the local society and the quantity and/or the quality of tourism. A downscale and bias-correction using a local dataset was applied to assess the impacts of climate change, and the relationships between GDP, population, and estimated land availability in the current situation were applied to assess the impact of socioeconomic change. As case studies, the scenarios were constructed to assess the impacts in the Republic of Palau and Ishigaki Island, Japan. Both are typical islands where tourism is the main industry. The situation of environmental resources, local society, and tourism under changing climate and socioeconomic conditions was assessed using these scenarios. The creation of reasonable projections under appropriate scenarios can contribute to sustainable development not only in these islands but also in most Pacific Islands.

  9. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930

    Directory of Open Access Journals (Sweden)

    Débora Marques de Almeida Nogueira Mortati

    2011-06-01

    Full Text Available The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The electricity generation in Brazil follows the paths of the railroad; and it was drawing newborders between rural and urban, rural and industry. The cities aspect was changing as the “improvements” were availability, many powered by electricity. The nascent industries were also occupying the space between the railroad and energy; what created new districts and centralities. Thispaper analyzes the processes that hydroelectric energy sets off in São Paulo state; and focuses on itsconsequences.

  10. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  11. Hydroelectric power: Energy vector for progress and development; Wasserkraft: Energievektor fuer Fortschritt und Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Meclot, B; Dupuy, M; Weis, H; Linari, A; Baril, M; Barlow, M; Cambi, M; Cullen, R; Genier, M; Germeau, J P; Madureira, C; Mellquist, P; Perea, A; Rost, M; Savey, P; Schiller, G; Talhull, A

    1997-11-01

    Hydroelectric power in the UNIPEDE member states has a share of about 18 percent, i.e. slightly less than the world average of 19 percent. Hydroelectric power has good future prospects: It is a renewable energy source and well suited for storage. (orig) [Deutsch] Wasserkraft ist eine Energie, die im Rahmen der von den Mitgliedslaendern der UNIPEDE genutzten Energieerzeugungsarten eine hohe Bedeutung hat. Sie repraesentiert durchschnittlich 18% der erzeugten elektrischen Energie, leicht unterhalb des weltweiten Durchschnitts (19%). Die Merkmale der Wasserkraft verdienen Aufmerksamkeit: Es handelt sich um eine erneuerbare Energie, die in grossen Mengen gespeichert werden kann und in der Energiewirtschaft eine grosse Rolle spielt. (orig.)

  12. Ergonomic evaluation of the environment: a case study in a control room of the hydroelectric sector.

    Science.gov (United States)

    Falcão, Christianne Soares; Soares, Marcelo Marcio

    2012-01-01

    Representative systematic evaluation studies of the workspace and the extent to which that space is suitable for performing tasks have been developed by professionals engaged on finding evidence as to the importance of users and designers being joint participants in drawing up projects. In this context, this paper sets out to evaluate the environment of a control room in the hydroelectric sector, based on a multidisciplinary method which integrates ergonomics, architecture and environmental psychology so as to assess the influence of space on the user, and thus to identify the user's level of satisfaction with it. It was observed that some adaptation strategies of the space for activities were not implemented satisfactorily, resulting in the need for further studies on making workspaces suitable.

  13. Technical progress report: Rhode Island crystalline repository project, calendar year 1985

    International Nuclear Information System (INIS)

    Vild, B.F.

    1985-01-01

    A Nuclear Waste Fund established by the Nuclear Waste Policy Act of 1982 provides financial support to affected states to participate in the high-level radioactive waste repository siting program of the US Department of Energy. In Rhode Island, that function is performed by a multidisciplinary Project Review Team consisting of staff from three State agencies. Members of the Review Team attended several meetings in 1985 to voice their concerns directly to DOE. Written comments were also submitted on draft plans and reports. Among the issues raised were inconsistencies in the geologic and environmental data used to screen potential repository sites, the role of Monitored Retrievable Storage (MRS) in the repository program, and regulations regarding the transportation and storage of nuclear waste. The Review Team also began work on a public information booklet describing the repository program in nontechnical terms. That booklet will be distributed widely upon completion

  14. Robust Optimisation for Hydroelectric System Operation under Uncertainty

    OpenAIRE

    Apostolopoulou, D.; De Greve, Z.; McCulloch, M.

    2018-01-01

    In this paper, we propose an optimal dispatch scheme for a cascade hydroelectric power system that maximises the head levels of each dam, and minimises the spillage effects taking into account uncertainty in the net load variations, i.e., the difference between the load and the renewable resources, and inflows to the cascade. By maximising the head levels of each dam the volume of water stored, which is a metric of system resiliency, is maximised. In this regard, the operation of the cascade ...

  15. Evaluation of economic rent of hydropower projects

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Abeygunawardana, A.M.A.K.

    2009-01-01

    Existing studies have mostly estimated the ex post economic rent of hydropower for the hydroelectric system of a province or a country as a whole and have ignored the site- or project-specific variations in the economic rent of hydropower plants. Further, most of the existing studies have used simplified methods to calculate the rent ex post. This paper presents a rigorous methodology for estimation of site-specific (i.e., project specific) economic rent of hydropower ex ante. It applies the methodology in the case of a hydropower project and analyzes the sensitivity of the rent to variations in some key parameters.

  16. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to study the constraints of Micro Hydroelectric Power Plants (MHPPs) installed in the West Region of Cameroon. The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution ...

  17. Roles of Inspecting Engineers during the Early Building Stages of the Necaxa Hydroelectric Complex

    Directory of Open Access Journals (Sweden)

    Elio Agustín Martínez Miranda

    2006-07-01

    Full Text Available Published literature on the history of electricity in Mexico spans a wide range of subjects and provides information on economic, social, political, technical and even environmental issues. This paper explores a scarcely studied vein, regarding science and education. It refers particularly to the Mexican engineers who, acting as Inspecting Engineers, participated in one of the largest hydroelectric systems of Mexico and Latin America, the Necaxa Hydroelectric Complex, and tries to answer questions such  as: what was their role?; where and what did they study?; were there any electrical engineers?; did they take any course in electricity or hydraulics?; did they apply this knowledge?; did they form part of a scientific community?; did they teach?

  18. Pilot project concerning the establishment of a collective biomass conversion plant on the island of Mors

    International Nuclear Information System (INIS)

    1993-06-01

    This pilot project comprises a feasibility study in connection with plans to establish a biomass conversion plant, on the Danish island of Mors, which would provide methane to be used as fuel, in combination with natural gas, for a cogeneration plant serving six villages. The subjects of location, organization, the transportation of biomass, the design of the biomass conversion plant, economical aspects and conditions of the use of the methane are discussed as a basis for decisions in this respect. Environmental considerations are also dealt with. (AB)

  19. 78 FR 50082 - South Farallon Islands Invasive House Mouse Eradication Project; Farallon National Wildlife...

    Science.gov (United States)

    2013-08-16

    ... Farallon Islands and Noonday Rock. In 1969 the Refuge was expanded to include the South Farallon Islands... to eradicate non-native, invasive house mice from the South Farallon Islands, part of the Farallon... the problem of invasive house mice on the South Farallon Islands. DATES: We will accept comments...

  20. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Cook Islands

    International Nuclear Information System (INIS)

    1977-11-01

    The Cook Islands total only 320 square kilometers in area are located in the central South Pacific, and are made up of either volcanic material or coral. Since neither rock type is considered a good host or source of uranium, the uranium potential of the Cook Islands is considered nil. (author)

  2. The renewal of hydroelectric concessions, an opportunity for France and its territories

    International Nuclear Information System (INIS)

    Thibault, Benjamin

    2017-01-01

    After having recalled that the legal framework for hydroelectric concessions is based on a law adopted in 1919, the author outlines that the opening to competition has in fact emerged at the beginning of the 2000's under the influence of the European Commission. The author indicates and comments various measures implemented regarding the destiny of concessions reaching their expiration date. In this respect, the recent law related to energy transition and for a green growth created an actual possibility of an opening to competition of these concessions. The author comments the content of this law, and its conditions of application. After having outlined that these evolutions have finally built up a complete framework, the author outlines how this opening to competition for hydroelectric concessions can be an opportunity, for example for the development of a modern governance at the local level, and for a better implementation of energy transition

  3. Wind power integration in island-based smart grid projects : A comparative study between Jeju Smart Grid Test-bed and Smart Grid Gotland

    OpenAIRE

    Piehl, Hampus

    2014-01-01

    Smart grids seem to be the solution to use energy from renewable and intermittent energy sources in an efficient manner. There are many research projects around the world and two of them are Jeju Smart Grid Test-bed and Smart Grid Gotland. They have in common that they are both island-based projects and connected to the Powergrid on the mainland by HVDC-link. The purpose of this thesis is to compare the two projects and find out what challenges and strategies they have related to wind power i...

  4. A contribution to the methods of determining the optimal exploitation of hydraulically related hydroelectric power plants of different owners

    International Nuclear Information System (INIS)

    Gievski, Igor

    2013-01-01

    For the purpose of solving the water-supply and energy-related problems of the city of Skopje, the need has arisen to construct the 'Skopsko Pole' hydro system. The 'Skopsko Pole' hydro system consists of the power plants 'Kozjak', 'SvetaPetka' and 'Matka'. It is envisioned to use the watercourse of the Treska River and has been envisaged as a multipurpose system, that is, as an anti-flood system, system for irrigation of agricultural land and an electricity producer. Certainly, the meeting of the aforementioned needs will depend on the hydrological potential of the Treska River, which is why an exact and detailed review of the hydrological potential of the Treska River is of vital importance. It is a complex task to determine the optimal work of the hydroelectric power plants built along the same river, even if this is about the so-called run-of-the-water hydroelectric power plants, given the different interests of the water consumers of the same watercourse. This problem will become more complicated if one or more (that is, all) hydroelectric power plants have their own accumulative pools. In this case, the question arises of how the waters of each of the accumulations should be used. During this, we need to bear in mind the fact that every release of water from each of the accumulations alters the elevation points of all the hydroelectric power plants on the same watercourse and thus affects their production and eventually the benefit of their work. With the restructuring of the electric energy systems in different countries over the past 20 years, the vertically integrated power plants have been converted into horizontally integrated ones. In many cases, it is different companies that are the electricity producers, the high-voltage electricity transmitters, and the medium- and low-voltage electricity distributors. Some of these companies are private companies, whereas others are state-owned. Such diverse ownership of the power plants, which are by default

  5. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  6. Targeted Expansion Project for Outreach and Treatment for Substance Abuse and HIV Risk Behaviors in Asian and Pacific Islander Communities

    Science.gov (United States)

    Nemoto, Tooru; Iwamoto, Mariko; Kamitani, Emiko; Morris, Anne; Sakata, Maria

    2011-01-01

    Access to culturally competent HIV/AIDS and substance abuse treatment and prevention services is limited for Asian and Pacific Islanders (APIs). Based on the intake data for a community outreach project in the San Francisco Bay Area (N = 1,349), HIV risk behaviors were described among the targeted API risk groups. The self-reported HIV prevalence…

  7. Storm Damage Reduction Project Design for Wallops Island, Virginia, Version 1.01

    Science.gov (United States)

    2011-10-01

    photograph. Figure 2-4 shows the erosion and storm damage to the Wallops Island Association Clubhouse at the north end of the island in May 1949. Figure 2...uncertainty in what future rates will be. By the Bruun rule (Bruun 1962), small changes in sea level can be expected to have dramatic effects on shoreline...known. What is clear is that the north end of Wallops Island is accreting. Therefore, more sand is being delivered to this area than is leaving. 9.2

  8. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Fiji Islands

    International Nuclear Information System (INIS)

    1977-12-01

    The Fiji Islands, comprising over 300 islands, with a total area of 18,700 square kilometers are basically either volcanic or coral. A small mining industry exists, however, and on the basis of that fact, and without geologic support of any kind a Category 1 (0 to 1,000 tonnes U) uranium potential has been assigned. (author)

  9. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  10. Report on the renewal of the hydro-electric concessions; Rapport sur le renouvellement des concessions hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  11. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Science.gov (United States)

    Finer, Matt; Jenkins, Clinton N

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  12. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Directory of Open Access Journals (Sweden)

    Matt Finer

    Full Text Available Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1 There is a critical need for further strategic regional and basin scale evaluation of dams. 2 There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3 Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  13. Mesoarchean Banded Iron Formation sequences in Dixon Island-Cleaverville Formation, Pilbara Australia: Oxygenic signal from DXCL project

    Science.gov (United States)

    Kiyokawa, S.; Ito, T.; Ikehara, M.; Yamaguchi, K. E.; Naraoka, H.; Onoue, T.; Horie, K.; Sakamoto, R.; Aihara, Y.; Miki, T.

    2013-12-01

    The 3.2-3.1 Ga Dixon island-Cleaverville formations are well-preserved Banded Iron Formation (BIF) within hydrothermal oceanic sequence at oceanic island arc setting (Kiyokawa et al., 2002, 2006, 2012). The stratigraphy of the Dixon Island (3195+15Ma) -Cleaverville (3108+13Ma) formations shows the well preserved environmental condition at the Mesoarchean ocean floor. The stratigraphy of these formations are formed about volcano-sedimentary sequences with hydrothermal chert, black shale and banded iron formation to the top. Based on the scientific drilling of DXCL project at 2007 and 2011, detail lithology between BIF sequence was clearly understood. Four drilling holes had been done at coastal sites; the Dixon Island Formation is DX site (100m) and the Cleaverville Formation is CL2 (40m), CL1 (60m) and CL3 (200m) sites and from stratigraphic bottom to top. Coarsening and thickening upward black shale-BIF sequences are well preserved of the stratigraphy form the core samples. The Dixon Island Formation consists komatiite-rhyolite sequences with many hydrothermal veins and very fine laminated cherty rocks above them. The Cleaverville Formation contains black shale, fragments-bearing pyroclastic beds, white chert, greenish shale and BIF. The CL3 core, which drilled through BIF, shows siderite-chert beds above black shale identified before magnetite lamination bed. U-Pb SHRIMP data of the tuff in lower Dixon Island Formation is 3195+15 Ma and the pyroclastic sequence below the Cleaverville BIF is 3108+13 Ma. Sedimentation rate of these sequence is 2-8 cm/ 1000year. The hole section of the organic carbon rich black shales below BIF are similar amount of organic content and 13C isotope (around -30per mill). There are very weak sulfur MIF signal (less 0.2%) in these black shale sequence. Our result show that thick organic rich sediments may be triggered to form iron rich siderite and magnetite iron beds. The stratigraphy in this sequence quite resemble to other Iron

  14. Small-scale hydroelectric power plant of Passo do Inferno automation system; Sistema de automatizacao da PCH Passo do Inferno

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Luiz C. Lisboa; Moralles, Reni; Quadros, Carlos A.D.; Martiny, Raul; Moehlecke, Juarez E.; Costa, Nelson D. da; Cesar, Rogerio L.; Santos, Sergio S.; Basei, Eleu Natal [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)

    1993-12-31

    This work introduces the automation system brought into the 1,7 MVA small-scale hydroelectric power plant of Passo do Inferno, state of Rio Grande do Sul, Brazil. The following systems are presented: supervision, security and generation control, as well as the program and the controller. In this work, it is focused the generation control system, as a new outfitted system in small-scale hydroelectric power plants 3 figs.

  15. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements

    International Nuclear Information System (INIS)

    Van Keeken, O.A.; Griffioen, A.B.

    2011-11-01

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [nl

  16. Coastal Change Processes Project data report for oceanographic observations near Fire Island, New York, February through May 2014

    Science.gov (United States)

    Armstrong, Brandy N.; Warner, John C.; List, Jeffrey H.; Martini, Marinna A.; Montgomery, Ellyn T.; Traykovski, Peter A.; Voulgaris, George

    2015-01-01

    An oceanographic field study during February through May 2014 investigated processes that control the sediment-transport dynamics along the western part of Fire Island, New York. This report describes the project background, field program, instrumentation configuration, and locations of the sensors deployed. The data collected, including meteorological observations, are presented as time-series plots for data visualization. Additionally, individual links to the database containing digital data files are available as part of this report.

  17. SITE-94, Biosphere Model for SKI Project on the island of Aspro

    International Nuclear Information System (INIS)

    Barrdahl, Runo Alfons Gunnar

    2003-01-01

    1 - Description of program or function: A simple biosphere model has been designed for use in the SKI project related to a hypothetical repository for spent nuclear fuel on the island of Aspro near Oskarshamn in Southern Sweden. Project SITE-94 studies the safety aspects of this hypothetical repository. Any weakness in repository performance will reveal itself as a leakage of radionuclides out of the repository, and finally into the biosphere where man and nature are at risk of being exposed. Thus, as the final link in estimating such leakage, a biosphere model will provide an estimate of resulting radiation impact on man and nature. 2 - Methods: The present biosphere model involves a stationary scenario (Reference Scenario) and a climate evolution and geological scenario (Central Scenario). The stationary and time evolution scenarios contain as primary recipients a well and the bay of Borholm, i.e., the waters surrounding the island of Aspo. The time evolution scenario additionally incorporates as primary recipients a waste sample from intrusion and, in a remote future time, the Baltic Sea. Transport of radionuclides within the model system is assumed to be essentially immediate, except for in sediment subject to land rise. Except for this pathway, radioactive decay is therefore not included at all in the model. Land rise sediment is modeled to be subject to radioactive decay from the time the sediment no longer constitutes sea bottom until the desired time point of the model. Correction for radioactive decay is thus generally supposed to be made outside the biosphere model. Unless otherwise indicated, yearly individual and population committed (50 years) radiation doses to man are considered, and all scenarios involve a constant flux of 1 Bq/y of each radionuclide considered into the respective primary recipient. Nominal values of radionuclide flux will finally be multiplied with the radiation dose per one Bq per year resulting from the model in order to obtain

  18. Small Island Visitor Attractions

    Directory of Open Access Journals (Sweden)

    Haven Allahar

    2015-03-01

    Full Text Available This article proposes a process framework for developing and managing visitor attractions (VA in small island developing states with Trinidad and Tobago, a two-island state in the Caribbean, as the case study. An extensive literature review was conducted, supported by field observations, individual depth interviews, and small and large focus group meetings. The process framework identified four sets of processes: national policy formulation and legislation; inventory, classification, evaluation, and ranking of VA; general operations management involving project management activities; and site specific activities of development, operations, and maintenance. The value of the framework lies in the fact that no similar framework applicable to small islands was covered in the literature and validation was obtained from a panel of experts and a cross section of tourism stakeholders in Tobago.

  19. Legacy of the Pacific Islander cancer control network.

    Science.gov (United States)

    Hubbell, F Allan; Luce, Pat H; Afeaki, William P; Cruz, Lee Ann C; McMullin, Juliet M; Mummert, Angelina; Pouesi, June; Reyes, Maria Lourdes; Taumoepeau, Leafa Tuita; Tu'ufuli, Galeai Moali'itele; Wenzel, Lari

    2006-10-15

    The groundwork for the Pacific Islander cancer control network (PICCN) began in the early 1990s with a study of the cancer control needs of American Samoans. The necessity for similar studies among other Pacific Islander populations led to the development of PICCN. The project's principal objectives were to increase cancer awareness and to enhance cancer control research among American Samoans, Tongans, and Chamorros. PICCN was organized around a steering committee and 6 community advisory boards, 2 from each of the targeted populations. Membership included community leaders, cancer control experts, and various academic and technical organizations involved with cancer control. Through this infrastructure, the investigators developed new culturally sensitive cancer education materials and distributed them in a culturally appropriate manner. They also initiated a cancer control research training program, educated Pacific Islander students in this field, and conducted pilot research projects. PICCN conducted nearly 200 cancer awareness activities in its 6 study sites and developed cancer educational materials on prostate, colorectal, lung, breast, and cervical cancer and tobacco control in the Samoan, Tongan, and Chamorro languages. PICCN trained 9 students who conducted 7 pilot research projects designed to answer important questions regarding the cancer control needs of Pacific Islanders and to inform interventions targeting those needs. The legacy of PICCN lies in its advancement of improving cancer control among Pacific Islanders and setting the stage for interventions that will help to eliminate cancer-related health disparities. Cancer 2006. (c) 2006 American Cancer Society.

  20. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development V: Instream Flow Needs for Fishery Resources

    Energy Technology Data Exchange (ETDEWEB)

    Loar, James M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-10-01

    The purpose of this document is to provide guidance to developers of small-scale hydroelectric projects on the assessment of instream flow needs. While numerous methods have been developed to assess the effects of stream flow regulation on aquatic biota in coldwater streams in the West, no consensus has been reached regarding their general applicability, especially to streams in the eastern United States. This report presents and reviews these methods (Section 2.0), which is intended to provide the reader with general background information that is the basis for the critical evaluation of the methods (Section 3.0). The strategy for instream flow assessment presented in Section 4.0 is, in turn, based on the implicit assumptions, data needs, costs, and decision-making capabilities of the various methods as discussed in Section 3.0.

  1. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  2. Topography changes monitoring of small islands using camera drone

    Science.gov (United States)

    Bang, E.

    2017-12-01

    Drone aerial photogrammetry was conducted for monitoring topography changes of small islands in the east sea of Korea. Severe weather and sea wave is eroding the islands and sometimes cause landslide and falling rock. Due to rugged cliffs in all direction and bad accessibility, ground based survey methods are less efficient in monitoring topography changes of the whole area. Camera drones can provide digital images and movie in every corner of the islands, and drone aerial photogrammetry is powerful to get precise digital surface model (DSM) for a limited area. We have got a set of digital images to construct a textured 3D model of the project area every year since 2014. Flight height is in less than 100m from the top of those islands to get enough ground sampling distance (GSD). Most images were vertically captured with automatic flights, but we also flied drones around the islands with about 30°-45° camera angle for constructing 3D model better. Every digital image has geo-reference, but we set several ground control points (GCPs) on the islands and their coordinates were measured with RTK surveying methods to increase the absolute accuracy of the project. We constructed 3D textured model using photogrammetry tool, which generates 3D spatial information from digital images. From the polygonal model, we could get DSM with contour lines. Thematic maps such as hill shade relief map, aspect map and slope map were also processed. Those maps make us understand topography condition of the project area better. The purpose of this project is monitoring topography change of these small islands. Elevation difference map between DSMs of each year is constructed. There are two regions showing big negative difference value. By comparing constructed textured models and captured digital images around these regions, it is checked that a region have experienced real topography change. It is due to huge rock fall near the center of the east island. The size of fallen rock can be

  3. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  4. Impacts of the Garafiri hydroelectric dam on the Konkoure estuary

    International Nuclear Information System (INIS)

    Samoura, K.; Waaub, J.P.

    2008-01-01

    This article described the environmental impacts caused by the exploitation of one or several dams in tropical coastal basins. In particular, it proposed a methodological approach for analyzing the vulnerability of ecosystems to modifications caused by the exploitation of the Garafiri hydroelectric dam in Guinea. With an installed power capacity of 75 MW, this dam has been operational since 1999 and has supplied electricity to coastal and mid Guinea since 2000. Since then, the ecosystem of the Konkoure River has undergone important changes. This study focused primarily on impacts during the dry season. Data was collected at different hydroelectric stations along the Konkoure Basin to estimate changes in water flow in the estuary. The study showed several changes, including noticeable impacts on the soil salt content. In addition, changes in vegetation were attributed to changes in soil content. The study revealed that rice production has increased 65 per cent since 2000, while salt exploitation has been completely discontinued. It was concluded that the hydraulic management of the dam can have a significant impact on the region's ecosystem which can in turn influence ecological and social economic functions. It was concluded that the vulnerability of the ecosystem can be worsened in the context of climate change. 25 refs., 9 figs

  5. [Fishery resource protection by artificial propagation in hydroelectric development: Lixianjiang River drainage in Yunnan as an example].

    Science.gov (United States)

    Yang, Yong-Hong; Yang, Jun-Xing; Pan, Xiao-Fu; Zhou, Wei; Yang, Mei-Lin

    2011-04-01

    Hydroelectric developments can result in a number of negative environmental consequences. Conservation aquaculture is a branch of science derived from conservation and population recovery studies on endangered fishes. Here we discuss the impacts on fishes caused by hydropower projects in Lixianjiang, and evaluate effects and problems on the propagation of Parazacco spilurus, Hemibagrus pluriradiatus, Neolissochilus benasi and Semilabeo obscurus. A successful propagation project includes foraging ecology in fields, pond cultivation, juvenile fish raising, prevention and curing on fish disease, genetic management, artificial releasing and population monitoring. Artificial propagation is the practicable act on genetic intercommunication, preventing population deterioration for fishes in upper and lower reaches of the dam. For long-term planning, fish stocks are not suitable for many kind of fishes, but can prevent fishes from going extinct in the wild. Basic data collection on fish ecology, parent fish hunting, prevention on fish disease are the most important factors on artificial propagation. Strengthening the genetic management of stock population for keeping a higher genetic diversity can increase the success of stock enhancement. The works on Lixianjiang provide a new model for river fish protection. To make sure the complicated project works well, project plans, commission contracts, base line monitoring and techniques on artificial reproduction must be considered early. Last, fishery conservation should be considered alongside location development.

  6. The future role of hydro-electricity in Sub-Saharan Africa

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1989-01-01

    Hydroelectric power currently supplies 56-93% of the electricity requirements of the different geographic areas of Sub-Saharan Africa and accounted for 73% of total requirements in 1980. The continent is richly endowed with hydro resources in all areas, with central Africa possessing the most abundant reserves. Existing installed hydro capacity is 13,500 MW and of the total technical resource of 290,000 MW, some 110,000 MW are estimated to constitute the potential that warrants investigation. The demand for electricity in the region is presently low and growing at 5-10%/y. It is projected to double from 47,000 GWh in 1980 to 110,000-170,000 GWh by the year 2000, and is likely to double again by 2020. Hydro reserves warranting investigation exceed the demand projected for the year 2000 by a ratio of over 3:1 and only 13 countries out of 36 have a ratio less than one. A large proportion of these reserves are estimated to be economic to develop relative to other means of power generation. The development of hydro resources should maintain the proportion of the demand met by hydro in the range of 60-75% well into the 21st century. The existing installed capacity is likely to be increased at the rate of 3,000-5,000 MW per decade to achieve this. Constraints on such increase include the large amounts of capital needed, environmental issues, the need to displace populations affected by flooding, and fluctuations in the oil price which make long-term planning uncertain. 5 refs., 1 fig., 11 tabs

  7. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

    2012-04-01

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000

  8. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant

    Directory of Open Access Journals (Sweden)

    Amevi Acakpovi

    2016-12-01

    Conclusion: The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  9. Epilogue. Environmental aspects of the design and construction of the Gabcikovo hydroelectric power project and environmental impact review based on the three-year monitoring and on the joint Slovak-Hungarian monitoring

    International Nuclear Information System (INIS)

    Lejon, E.

    1996-01-01

    In this chapter of the book author deals with the Gabcikovo-Nagymaros Project (GNP). The Gabcikovo part of the hydroelectric power project was based on a combination of flood control, navigational improvements and the production of electric energy. The Gabcikovo Project has not only saved the inundation area with the flood plain ecotopes, but also includes a wide variety of tools for surface and ground water management, and thus also for the management, or optimalization, of the development of agricultural conditions, inundation biotopes, forestry, river branches biotopes, flood management and the flooding of parts of the inundation area, sedimentation and erosion processes, ground and surface water quality, and other environmental effects management. The GNP, as conceived in the 1977 International Czechoslovak-Hungarian Treaty, is located roughly between 1,860 rkm (river kilometer), at Bratislava, and 1,696 rkm, at Nagymaros. The Hungarians unilaterally decided to abandon the construction of Nagyamaros, and to suspend the work to be carried out on the GNP. After the decision, in order to minimize the spread of economic and ecologic damages to ensure flood protection at least on the Hungarian Szikekoez, to exploit the available power potential, and to create conditions necessary for navigation on the Danube, the Government of the Czech and Slovak Federal Republic decided in December 1991, to put nearly ready Gabcikovo part of the system into operation, constructing the necessary technical structures on their own territory and inside of the construction area of the original Project. These technical structures are known as 'Variant C'. 'Variant C' is situated inside the area of the original project, replaces the function of the Dunakiliti weir in Hungary and uses all of the completed structures of the Gabcikovo part of the Project. The geology, Danube, ground water, pre-dam long-term development, changes after putting the Gabcikovo structures into operation, as well

  10. A preliminary economic feasibility assessment of nuclear desalination in Madura Island

    International Nuclear Information System (INIS)

    Kim, S.-H.; Hwang, Y.-D.; Konishi, T.; Hudi Hastowo

    2005-01-01

    A joint study between KAERI and BATAN, which is entitled 'A preliminary economic feasibility assessment of nuclear desalination in Madura Island', is being conducted under the framework of the Interregional Technical Cooperation Project of IAEA, signed on Oct. 10, 2001 at IAEA. The duration of the project is January 2002 to December 2004. An economic feasibility of nuclear desalination using system-integrated modular advanced reactor (SMART), which will provide Madura Island with electricity and potable water and also support industrialisation and tourism, will be assessed during the project. The scope of this joint study includes the analyses for the short- and long-term energy and water demand as well as the supply plan for Madura Island, evaluation of the site characteristics, environmental impacts and health aspects, technical and economic evaluation of SMART and its desalination system, including the feasibility of its being identified on the Madura Island. KAERI and BATAN are cooperating in conducting a joint study, and IAEA provides technical support and a review of the study products. This paper presents the interim results of the joint study by focussing on the technical and economic aspects of nuclear desalination using SMART in Madura Island. (author)

  11. Map of the portfolio of projects of energy efficiency and of renewable energies by the AFD group and the FFEM

    International Nuclear Information System (INIS)

    Guillaumie, Koulm; Briand, Claude; Ries, Alain

    2007-09-01

    The AFD (the French Agency for Development) and the FFEM (French Fund for World Environment) are involved in cooperation and partnership projects for the development of energy efficiency, notably, but not only, in developing and emerging countries. This report first proposes a classification of these projects according to a typology which comprises the concerned sectors (urban planning and housing, fuels, hydroelectricity and wind energy, electricity distribution, industries and services, transports and mobility, capacity building, multi-sector), the intervener (AFD, FFEM, and Proparco, an AFD's subsidy), the project evolution in time (number of projects, evolution of funding), the funding type (loan types, subsidy, credit line), and the geographical area. The second part discusses the conditions to start projects in energy management: legal framework, economic conditions, funding, social and environmental factors, and technical factors. Appendices propose a set of ten technical sheets which indicate and discuss conditions of success as well as obstacles for different types of projects: big dams, mini hydroelectric projects, wind energy, biomass/biogas co-generation, bio-fuels, decentralised rural electrification based on renewable energy projects, collective transports and energy efficiency in transports, development of partnerships and institutional support, multi-sector tools of investment, and carbon market

  12. Rhode Island crystalline repository siting project: Technical progress report, Calendar year 1986

    International Nuclear Information System (INIS)

    Vild, B.

    1987-01-01

    A Nuclear Waste Fund established by the Nuclear Waste Policy Act of 1982 provides financial support to affected states to participate in the high-level radioactive waste repository siting program of the US Department of Energy. In Rhode Island, that function was performed by a multidisciplinary Project Review Team consisting of staff from three State agencies. Members of the Review Team attended several meetings in 1986 to discuss mutual concerns with Federal, State and Tribal officials. Comments were developed on DOE's Draft Area Recommendation Report. Members of the Review Team also testified at a public hearing in Providence on the Draft ARR, and developed and distributed a public information booklet. In May, Secretary of Energy John Herrington announced the suspension of the crystalline repository siting program. The remainder of the year was spent monitoring litigation challenging that decision and pending legislation. Administrative phase-down of the program was essentially complete by the close of the calendar year

  13. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  14. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Solomon Islands

    International Nuclear Information System (INIS)

    1977-12-01

    The Solomon Islands have an area of about 30,000 square kilometers. The larger islands are volcanic and contain a small variety of minerals, some of which may eventually be economically recoverable. A large phosphate deposit may also be mined at some future date. Specific geologic information is very difficult to find, but on the basis of what little is available a small potential is deduced to be in Category 2 (l,000 - 10,000 tonnes U). (author

  15. Spent fuel storage at Prairie Island: January 1995 status

    International Nuclear Information System (INIS)

    Closs, J.; Kress, L.

    1995-01-01

    The disposal of spent nuclear fuel has been an issue for the US since the inception of the commercial nuclear power industry. In the past decade, it has become a critical factor in the continued operation of some nuclear power plants, including the two units at Prairie Island. As the struggles and litigation over storage alternatives wage on, spent fuel pools continue to fill and plants edge closer to premature shutdown. Due to the delays in the construction of a federal repository, many nuclear power plants have had to seek interim storage alternatives. In the case of Prairie Island, the safest and most feasible option is dry cask storage. This paper discusses the current status of the Independent Spent Fuel Storage Installation (ISFSI) Project at Prairie Island. It provides a historical background to the project, discusses the notable developments over the past year, and presents the projected plans of the Northern States Power Company (NSP) in regards to spent fuel storage

  16. Report on the radioactive mineral development project in Negros Island

    International Nuclear Information System (INIS)

    Santos, G. Jr.

    1981-12-01

    A reconnaissance radiometric and stream sediment survey was conducted in Negros Island from April to May 1980. An area in Mabinay, Negros Oriental with significant above-background uranium in stream sediment was delineated in Upper Miocene to Pliocene continental clastic associated with silty limestone. In general, Negros has low radioactivity except for isolated points which have 2-3 times above-the-background radioactivity. Other areas in the western part of the island with high radioactivity and above-normal uranium in stream sediments were delineated. However, these above-normal observations were noted in areas underlain by recent volcanic sediments which were probably derived from Mt. Kanlaon. (author)

  17. The adventure of hydroelectricity must continue

    International Nuclear Information System (INIS)

    Gravel, C.

    1997-01-01

    An interview with Andre Caille, president and CEO of Hydro-Quebec was presented. The interview focussed on the hydroelectric potential of Hydro-Quebec and open access to the American wholesale market. Hydro-Quebec has the capability to produce 160 to 170 terawatt hours of energy per year which is enough to meet all of Quebec''s needs and to export 12 to 15 per cent. According to M. Caille, research in the field of superconductivity would significantly benefit Hydro-Quebec, since the utility is responsible for 107,000 kilometers of transmission lines. If transmission line losses along those lines could be reduced, power stations could be built even farther from markets. With respect to pricing, Hydro-Quebec continues to sell electricity at regulated prices in Quebec, however, export prices to the U.S. are market driven

  18. 78 FR 61937 - Safety Zone; Port of Galveston, Pelican Island Bridge Repair

    Science.gov (United States)

    2013-10-07

    ... Zone; Port of Galveston, Pelican Island Bridge Repair AGENCY: Coast Guard, DHS. ACTION: Temporary final... safety during the Pelican Island Bridge Repair Project. This action is necessary to protect public... barge will be placed under the Pelican Island Bridge; therefore immediate action is needed to protect...

  19. Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map

    Science.gov (United States)

    He, Yaoyao; Yang, Shanlin; Xu, Qifa

    2013-07-01

    In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.

  20. Habitat Evaluation Procedures (HEP) Report; Big Island - The McKenzie River, Technical Report 1998-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Sieglitz, Greg

    2001-03-01

    The Big Island site is located in the McKenzie River flood plain, containing remnant habitats of what was once more common in this area. A diverse array of flora and fauna, representing significant wildlife habitats, is present on the site. Stands of undisturbed forested wetlands, along with riparian shrub habitats and numerous streams and ponds, support a diversity of wildlife species, including neotropical migratory songbirds, raptors, mammals, reptiles, and amphibians (including two State-listed Sensitive Critical species). The project is located in eastern Springfield, Oregon (Figure 1). The project area encompasses 187 acres under several ownerships in Section 27 of Township 17S, Range 2W. Despite some invasion of non-native species, the site contains large areas of relatively undisturbed wildlife habitat. Over several site visits, a variety of wildlife and signs of wildlife were observed, including an active great blue heron rookery, red-Legged frog egg masses, signs of beaver, and a bald eagle, Wildlife habitat values resulting from the purchase of this site will contribute toward the goal of mitigating for habitat lost as outlined in the Bonneville Power Administration's (BPA) Mitigation and Enhancement Plan for the Willamette River Basin. Under this Plan, mitigation goals and objectives were developed as a result of the loss of wildlife habitat due to the construction of Federal hydroelectric facilities in the Willamette River Basin. Results of the Habitat Evaluation Procedures (HEP) will be used to: (1) determine the current habitat status of the study area and habitat enhancement potential of the site consistent with wildlife mitigation goals and objectives; and (2) develop a management plan for the area.

  1. Mercury accumulation in bats near hydroelectric reservoirs in Peninsular Malaysia.

    Science.gov (United States)

    Syaripuddin, Khairunnisa; Kumar, Anjali; Sing, Kong-Wah; Halim, Muhammad-Rasul Abdullah; Nursyereen, Muhammad-Nasir; Wilson, John-James

    2014-09-01

    In large man-made reservoirs such as those resulting from hydroelectric dam construction, bacteria transform the relatively harmless inorganic mercury naturally present in soil and the submerged plant matter into toxic methylmercury. Methylmercury then enters food webs and can accumulate in organisms at higher trophic levels. Bats feeding on insects emerging from aquatic systems can show accumulation of mercury consumed through their insect prey. In this study, we investigated whether the concentration of mercury in the fur of insectivorous bat species was significantly higher than that in the fur of frugivorous bat species, sampled near hydroelectric reservoirs in Peninsular Malaysia. Bats were sampled at Temenggor Lake and Kenyir Lake and fur samples from the most abundant genera of the two feeding guilds-insectivorous (Hipposideros and Rhinolophus) and frugivorous (Cynopterus and Megaerops) were collected for mercury analysis. We found significantly higher concentrations of total mercury in the fur of insectivorous bats. Mercury concentrations also differed significantly between insectivorous bats sampled at the two sites, with bats from Kenyir Lake, the younger reservoir, showing higher mercury concentrations, and between the insectivorous genera, with Hipposideros bats showing higher mercury concentrations. Ten bats (H. cf. larvatus) sampled at Kenyir Lake had mercury concentrations approaching or exceeding 10 mg/kg, which is the threshold at which detrimental effects occur in humans, bats and mice.

  2. A Sein Island in renewable electric power autonomy? Analysis of the Government's project for the Sein Island

    International Nuclear Information System (INIS)

    Flocard, Hubert; Le Gorgeu, Jean-Pierre

    2018-01-01

    Even if the Sein Island emits less CO 2 emissions than 700 vehicles, the Government set an objective of 50 per cent for renewable energy production within its multi-year energy planning (PPE). The objectives of the authors is herein to analyse the credibility of these PPE objectives, more particularly as far as electric power autonomy is concerned. They used available and precise data related to the island's energy consumption. They show that this 50 per cent coverage can indeed be reached, but with investments which are not justified when the population size and current resulting pollution are considered. They also outline that diesel engines will still be used from time to time, and that their emissions will not even be reduced as diesel units will not operate in optimal regime. Therefore, they regret that such objectives have been imposed to the island without any detailed preliminary study

  3. 77 FR 59389 - Hawks Nest Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-09-27

    .... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...

  4. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  5. Amchitka Island Environmental Analysis at Idaho National Laboratory

    International Nuclear Information System (INIS)

    Gracy Elias; W. F. Bauer; J.G. Eisenmenger; C.C. Jensen; B.K. Schuetz; T. C. Sorensen; B.M. White; A. L. Freeman; M. E. McIlwain

    2005-01-01

    The Idaho National Laboratory (INL) provided support to Consortium for Risk Evaluation with Stakeholder Participation (CRESP) in their activities which is supported by the Department of Energy (DOE) to assess the impact of past nuclear testing at Amchitka Island on the ecosystem of the island and surrounding ocean. INL participated in this project in three phases, Phase 1, Phase 2 and Phase 3

  6. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  7. Evaluation of environmental impacts caused by hydroelectric power plants in native forest areas and mitigation measures

    International Nuclear Information System (INIS)

    Ramalho, Cyro Pinheiro

    1992-01-01

    The following work has the intention of demonstrating the importance of native forest to the human life, not only through its inherent qualities as something to preserve, but also as a source of great resources, and in particular hydroelectric resource that, by today's necessities are bounded to be explored. The negative effects caused by the implementation of a hydroelectric plant are shown together with the necessity of adoption of measures that would soften the environment impact of it. For the adoption of those measures, many forest studies were proposed in the search for its complete characterization. Each of these studies are duly defined and presented in their general and specific goals. The most adequate methodology is finally recommended. (author). 14 refs

  8. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  9. NOAA Digital Orthophotography for the Coasts of Connecticut and Long Island, NY

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Project: NOAA Digital Orthophotography for the Coasts of Main/New Hampshire, Massachusetts/Rhode Island/Connecticut, and Hudson River/Long Island /NY/NJ Contract No....

  10. Hydroelectricity, land use and water managing; Hidroelectricidad, uso del suelo y manejo del agua

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Canet, Lourdes [Proyectos Geotermoelectricos, Aplica, S. A., Mexico, D. F. (Mexico)

    1997-12-31

    This document deals with the importance of determining the vocation of the geographic site where it is pretended to execute a hydroelectric project, since it is necessary to asses various alternative sites, in order to select the most appropriate, where the environmental impacts be less, without forgetting for a minute the ecological criteria for its final selection. Unfortunately there are not environmental studies of periodic continuation departing from the commissioning of a dam, since this studies would permit to know the real environmental impacts in order to solve them later [Espanol] Este documento trata la importancia de determinar la vocacion del lugar geografico donde se pretende llevar a cabo un proyecto hidroelectrico, ya que es necesario evaluar diversos lugares alternativos, con objeto de elegir el mejor, donde los impactos ambientales sean menores, sin olvidar en ningun momento los criterios ecologicos para su eleccion definitiva. Lamentablemente no hay estudios ambientales de seguimiento periodicos a partir de que una presa se encuentre en operacion, ya que estos estudios permitirian conocer realmente los impactos ambientales para poder solucionarlos posteriormente

  11. Locked on course: Hydro-Quebec's commitment to mega-projects

    International Nuclear Information System (INIS)

    Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro; Lee, J.; Stewart, A.

    1997-01-01

    Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier success with large projects, (2) its engineering culture''s norms for consistency, and (3) its role in the government''s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects

  12. Hydrogen-based industry from remote excess hydroelectricity

    International Nuclear Information System (INIS)

    Ouellette, N.; Rogner, H.-H.; Scott, D.S.

    1997-01-01

    This paper examines synergies, opportunities and barriers associated with hydrogen and excess hydro-electricity in remote areas. The work is based on a case study that examined the techno-economic feasibility of a new hydrogen-based industry using surplus/off-peak generating capacity of the Taltson Dam and Generating Station in the Northwest Territories, Canada. After evaluating the amount and cost of hydrogen that could be produced from the excess capacity, the study investigates three hydrogen utilization scenarios: (1) merchant liquid or compressed hydrogen, (2) hydrogen as a chemical feedstock for the production of hydrogen peroxide, (3) methanol production from biomass, oxygen and hydrogen. Hydrogen peroxide production is the most promising and attractive strategy in the Fort Smith context. The study also illustrates patterns that recur in isolated sites throughout the world. (Author)

  13. Hydroelectric rent and precipitation variability: the case of Norway

    International Nuclear Information System (INIS)

    Amundsen, E.S.; Tjoetta, Sigve

    1993-01-01

    Norway is about to reorganize its electricity production sector from a predominantly administered one to one which is based on market prices and principles of efficiency. The objective of this paper is to model the energy sector and to measure the size of hydro rent before and after the reorganization. We construct a regionally diversified and integrated equilibrium model of production, transmission and distribution of hydroelectricity. Particular attention is paid to the role of precipitation variability for the size and regional variation of hydro rent. We consider alternative routes for assessing the size of hydro rent in a long-run perspective. (author)

  14. Response of roseate tern to a shoreline protection project on Falkner Island, Connecticut

    Science.gov (United States)

    Rogers, C.J.; Spendelow, J.A.; Guilfoyle, Michael P.; Fischer, Richard A.; Pashley, David N.; Lott, Casey A.

    2007-01-01

    Construction was initiated following the 2000 tern breeding season for Phase 1 of a planned two-phase ?Shoreline Protection and Erosion Control Project? at the Falkner Island Unit of the USFWS Stewart B. McKinney National Wildlife Refuge located in Long Island Sound off the coast of Guilford, CT. When the Common Tern (Sterna hirundo) and federally endangered Roseate Tern (S. dougallii) arrived in spring 2001, they encountered several major habitat changes from what had existed in previous years. These changes included: a rock revetment covering most of the former nesting habitat on the beach from the northwestern section around the northern tip and covering about 60% of the eastern side; an elevated 60- ? 4-m shelf covering the beach and lower bank of the southwestern section; and about 2,000 sq m of devegetated areas on top of the island on the northeast side above the revetment, and about one-third of the southern half of the island. The southwest shelf was created by bulldozing and compacting extra construction fill and in situ materials. This shelf differed in internal structure from the main revetment on the north and eastern sections of the island because it lacked the deep internal crevices of the revetment. The deep internal crevices were created from the large stones and boulders (up to 2 tons) used in the construction of the main revetment. Small rock and gravel was used to fill the crevices to within 3 feet (0.9 m) of the surface of the revetment. Because half-buried tires and nest boxes for the six Roseate Tern (Sterna dougallii) sub-colony areas were deployed in similar patterns on the remaining beach, and nest boxes were placed on the newly elevated shelf areas several meters above previous locations on the now-covered beach areas, the distribution of Roseate Tern nests did not change much from 2000 to 2001. However, the movements of Roseate Tern chicks ? in many cases led by their parents towards traditional hiding places ? into the labyrinth of

  15. Yeu and Noirmoutier islands - Electric connection to the offshore wind farm. Brochure 'Electric connection of the offshore wind farm to the Yeu and Noirmoutier islands' - Consultation file, December 2015, District of Vendee. Document of contribution to the public debate. Yeu and Noirmoutier islands offshore wind farm project - Project commissioner file

    International Nuclear Information System (INIS)

    Boyadjis, Jean-Marc; Corallo, Christian

    2015-05-01

    After a brief presentation of the context, a first document presents the connection characteristics, the general route of the electrical connection, how the sea and ground environment is taken into account, how the population is consulted for the project, the organisation of the public inquiry. The second document presents the consultation file with a description of the adopted solution and main characteristics of the project of connection of offshore wind farms about the Yeu and Noirmoutier islands, an analysis of the initial condition of the environment (physical and natural environment, landscapes and heritage, human and social-economic context), a description and a comparative analysis of proposed beams for the underwater connection, landfall and underground connection, and the planned continuation of the project (consultation, administrative procedure, planning). The next document aims at presenting the project before public consultation: objectives, underwater and underground connections with some of their technical characteristics, planning. Another document also presents the offshore wind farm project, its energetic and technical characteristics, how it is integrated into its environment (stakes and challenges, impacts on landscape and on activities), how it is an example of the development of offshore wind energy sector. It is completed by several appendices containing a variety of data on these issues. A last document is a presentation of the project by the project commissioner (RTE) which notably addresses how technical and environmental issues are to be addressed

  16. Seasonal variation in plasma nonesterified fatty acids of Lake Sturgeon (Acipenser fulvescens) in the vicinity of hydroelectric facilities

    International Nuclear Information System (INIS)

    McKinley, R.S.; Power, G.; Singer, T.D.; Ballantyne, J.S.

    1993-01-01

    To establish the effects of hydroelectric generation on the health of lake sturgeon (Acipenser fulvescens), seasonal variations in plasma nonesterified fatty acids (NEFAs) upstream and downstream from hydroelectric stations were measured over a 2-y period. Plasma NEFA profiles were also compared up- and downstream of the stations for differences in utilization of individual NEFA species as substrates for lipid oxidation. Significantly higher levels of total plasma NEFA were found in lake sturgeon upstream (2355 ± 395.9 nmole/ml) compared with those downstream (798 ± 133.5 nmole/ml) of the generating stations during the spring. The NEFA profiles for several key fatty acid species differed significantly among seasons up- and downstream of the facilities. In particular, during spring and summer, the levels of oleic acid (18:1n9) were highest upstream of the stations and levels of a polyunsaturated fatty acid, docosahexaenoic acid (22:6n3), were higher below rather than above the stations. The differences in plasma NEFA concentration may be attributed to altered nutritional status due to the varying flow regime located downstream of the hydroelectric stations. 33 refs., 4 figs., 1 tab

  17. Hydroelectricity and ecological considerations. Falsification of the environmental reality by the opponents of hydropower

    Directory of Open Access Journals (Sweden)

    Andrzej Giziński

    2013-09-01

    Full Text Available Opponents of hydroelectricity claim falsely that hydrotechnical development of the Lower Vistula River constitutes implementation of Edward Gierek’s concept of bringing only environmental damage1. Statements on the negative environmental impact of constructing small hydroelectric power stations (SHPS are equally groundless. Permanent protests against the construction of dams and river damming, regardless of the motivations and will of protesters, increase energy dependence on Russia, and preserves the poor, post-Bierut hydrological situation2. The main fallacy made by hydropower opponents is the alternative treatment of power and environmental purposes. Environmental errors consist in continuous omission of even the most obvious positive ecological effects of constructing river dams and – what is especially reprehensible – inventing non-existent threats, e.g. lethal concentration of toxic heavy metals in deposits of the Włocławek Reservoir or the detrimental impact of warming up water in stage of falls on the fish population below the dam.

  18. The renewal of hydroelectric concessions in competitive call

    International Nuclear Information System (INIS)

    2013-01-01

    This document discusses various issues associated with the planned competitive call on the French hydraulic power plants. The principles of this competitive call for hydroelectric concessions are first addressed: administrative regime of concessions, competitive call process, criteria of selection of the concession holder, case of 'concession of valleys', potential competitors. It outlines and discusses the difficulties of this competitive call: France is the single country to implement this procedure; it concerns a national asset; it questions the guarantee of a future use of equipment at best for the energy benefits of French consumers; the competitive call is a nice idea indeed but extremely complex. A note discusses the profitability aspects of Plants for Transfer of Energy by Pumping

  19. Productivity and efficiency analysis of privatized hydroelectric generation with a sometimes free input

    Science.gov (United States)

    Halabi, Claudia Elizabeth

    2000-10-01

    In this paper I use a stochastic distance frontier approach to assess the performance of Chile's hydroelectric industry, which operates within a regulatory framework designed to achieve a competitive outcome. An occasionally free input, water, is the sole energy input. The econometric analysis indicates substantial technical and allocative inefficiencies as well as volatile productivity scores, due presumably to the volatility of the energy input. Some allocative inefficiencies have diminished dramatically as the time under deregulation has grown. The Lerner index suggests that firms in the industry enjoy some degree of market power, reflected by prices that exceed marginal costs. This market power is consistent with operation within a centralized dispatch center, as predicted by a strategic bidding model. I also find that run-of-river plants exhibit increasing returns to scale, while plants relying on dams show slightly diminishing returns. The shadow marginal cost for run-of-river plants is found to be close to zero. Substantial cost savings could be realized if firms in Chile's hydro-electric generation industry were to operate efficiently.

  20. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make