WorldWideScience

Sample records for inventory control project

  1. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    operation is highly automated. However, the procedures for estimating demands and the policies for the inventory control system that were in use at the beginning of the project did not fully match the sophisticated technological standard of the physical system. During the initial phase of the project...... We describe the development of a framework to compute the optimal inventory policy for a large spare-parts' distribution centre operation in the RA division of the Danfoss Group in Denmark. The RA division distributes spare parts worldwide for cooling and A/C systems. The warehouse logistics...

  2. Effects of control technology on the projected krypton-85 environmental inventory

    International Nuclear Information System (INIS)

    Oscarson, E.E.

    1973-01-01

    Growth projections for the USA nuclear power industry may be used to make projections of future radioactive material inventories available for potential release to the environment. Since krypton-85 is produced in reactors, the potential routes of release to the environment are at the reactors or the fuel reprocessing plants. The present generation of reactors and fuel reprocessing plants do not use any systems to limit the release of krypton-85 into the biosphere. Clean-up systems are currently being designed and could be introduced when necessary. The cumulative inventory of krypton-85 in the environment is dependent upon the time of introduction of these clean-up systems and their efficiencies, in addition to the total quantity produced. Annual and cumulative inventories of krypton-85 are projected to increase dramatically over the next 50 years. If controls are assumed to be initiated at various years, a series of graphs of different cumulative environmental inventories and the associated doses and health effects are drawn. Varying the year of introduction and the efficiency of these systems allows one to speculate as to the optimum time for control implementation

  3. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    2008-01-01

    procedures for determining suitable inventory control variables based on the fitted demand distributions and a service-level requirement stated in terms of an order fill rate. Finally, we validated the results of our models against the procedures that had been in use in the company. It was concluded...

  4. Inventory control strategies

    International Nuclear Information System (INIS)

    Primrose, D.

    1998-01-01

    Finning International Inc. is in the business of selling, financing and servicing Caterpillar and complementary equipment. Its main markets are in western Canada, Britain and Chile. This paper discusses the parts inventory strategies system for Finning (Canada). The company's territory covers British Columbia, Alberta, the Yukon and the Northwest Territories. Finning's parts inventory consists of 80,000 component units valued at more than $150 M. Distribution centres are located in Langley, British Columbia and Edmonton, Alberta. To make inventory and orders easier to control, Finning has designed a computer-based system, with software written exclusively for Caterpillar dealers. The system makes use of a real time electronic interface with all Finning locations, plus all Caterpillar facilities and other dealers in North America. Details of the system are discussed, including territorial stocking procedures, addition to stock, exhaustion of stock, automatic/suggest order controls, surplus inventory management, and procedures for jointly managed inventory. 3 tabs., 1 fig

  5. Projecting Timber Inventory at the Product Level

    Science.gov (United States)

    Lawrence Teeter; Xiaoping Zhou

    1999-01-01

    Current timber inventory projections generally lack information on inventory by product classes. Most models available for inventory projection and linked to supply analyses are limited to projecting aggregate softwood and hardwood. The research presented describes a methodology for distributing the volume on each FIA (USDA Forest Service Forest Inventory and Analysis...

  6. Base-age invariance and inventory projections

    Science.gov (United States)

    C. J. Cieszewski; R. L. Bailey; B. E. Borders; G. H. Brister; B. D. Shiver

    2000-01-01

    One of the most important functions of forest inventory is to facilitate management decisions towards forest sustainability based on inventory projections into the future. Therefore, most forest inventories are used for predicting future states of the forests, in modern forestry the most common methods used in inventory projections are based on implicit functions...

  7. Radioactive waste inventories and projections

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from January 1981 through September 1982. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. (25 abstracts)

  8. Inventory Control System by Using Vendor Managed Inventory (VMI)

    OpenAIRE

    Dona Sabila Alzena; Mustafid Mustafid; Suryono Suryono

    2018-01-01

    The inventory control system has a strategic role for the business in managing inventory operations. Management of conventional inventory creates problems in the stock of goods that often runs into vacancies and excess goods at the retail level. This study aims to build inventory control system that can maintain the stability of goods availability at the retail level. The implementation of Vendor Managed Inventory (VMI) method on inventory control system provides transparency of sales data an...

  9. Project of an information integrated system to provide support to the regulatory control of the radioactive waste inventory

    International Nuclear Information System (INIS)

    Christovao, Marilia Tavares

    2005-05-01

    Sources and radioactive waste deriving from industry activities, medical practice and other areas are collected, received, and stored as waste on Brazilian Nuclear Energy Commission (CNEN) Institutes, that also generate, treat and store their own radioactive waste. The object of this project is to present an Integrated Information System named SICORR, having as guidelines, the referred processes to the radioactive waste regulatory control, under the responsibility of the Radioactive Waste Division (DIREJ), the General Coordination of Licensing and Control (CGLC), the Directorate of Safety and Radiation Protection (DRS) and the CNEN. The main objective of the work was reached, once the project SICORR modeling considers the radioactive waste control inventory, enclosing the treatment and integration of the radioactive waste and the radionuclides data and processes; the installations that produce, use, transport or store radiation sources data; and, CNEN Institutes responsible for the radioactive waste management data. The SICORR functions or essential modules involve the data treatment, integration, standardization and consistency between the processes. The SICORR specification and the analysis results are registered in documents, Software Specification Proposal (PESw) and Software Requirements Specification (ERSw), and are presented in text, in diagrams and user interfaces. Use cases have been used in the SICORR context diagram. The user interfaces for each use case have been detailed, defining the graphical layout, the relationships description with other interfaces, the interface details properties and the commands and the product entrances and exits. For objects radioactive waste and radionuclides, states diagrams have been drawn. The activities diagram represents the business model process. The class diagram represents the static objects and relationships that exist between them, under the specification point of view. The class diagram have been determined

  10. Radwaste inventories and projections: an overview

    International Nuclear Information System (INIS)

    Notz, K.J.

    1982-07-01

    The Integrated Data Base program was set up to provide fully integrated and reconciled inventories, characteristics, and projections for spent nuclear fuel and all categories of radioactive waste. Eight summary papers, six of which were presented at an ANS special session in Los Angeles in June 1982, are included in this report: data base needs and functions: national planning; integrated data base for spent fuel and radwaste: inventories; integrated data base projections; RAWSYM: radioactive waste management system; NWTS program waste projection data needs; low-level waste management data base system; waste sludge composition at the Savannah River Plant; and summary of characteristics of transuranic waste found at DOE sites

  11. Inventory Control System by Using Vendor Managed Inventory (VMI

    Directory of Open Access Journals (Sweden)

    Dona Sabila Alzena

    2018-01-01

    Full Text Available The inventory control system has a strategic role for the business in managing inventory operations. Management of conventional inventory creates problems in the stock of goods that often runs into vacancies and excess goods at the retail level. This study aims to build inventory control system that can maintain the stability of goods availability at the retail level. The implementation of Vendor Managed Inventory (VMI method on inventory control system provides transparency of sales data and inventory of goods at retailer level to supplier. Inventory control is performed by calculating safety stock and reorder point of goods based on sales data received by the system. Rule-based reasoning is provided on the system to facilitate the monitoring of inventory status information, thereby helping the process of inventory updates appropriately. Utilization of SMS technology is also considered as a medium of collecting sales data in real-time due to the ease of use. The results of this study indicate that inventory control using VMI ensures the availability of goods ± 70% and can reduce the accumulation of goods ± 30% at the retail level.

  12. Inventory Control System by Using Vendor Managed Inventory (VMI)

    Science.gov (United States)

    Sabila, Alzena Dona; Mustafid; Suryono

    2018-02-01

    The inventory control system has a strategic role for the business in managing inventory operations. Management of conventional inventory creates problems in the stock of goods that often runs into vacancies and excess goods at the retail level. This study aims to build inventory control system that can maintain the stability of goods availability at the retail level. The implementation of Vendor Managed Inventory (VMI) method on inventory control system provides transparency of sales data and inventory of goods at retailer level to supplier. Inventory control is performed by calculating safety stock and reorder point of goods based on sales data received by the system. Rule-based reasoning is provided on the system to facilitate the monitoring of inventory status information, thereby helping the process of inventory updates appropriately. Utilization of SMS technology is also considered as a medium of collecting sales data in real-time due to the ease of use. The results of this study indicate that inventory control using VMI ensures the availability of goods ± 70% and can reduce the accumulation of goods ± 30% at the retail level.

  13. Spent fuel and waste inventories and projections

    International Nuclear Information System (INIS)

    Carter, W.L.; Finney, B.C.; Alexander, C.W.; Blomeke, J.O.; McNair, J.M.

    1980-08-01

    Current inventories of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled, based on judgments of the most reliable information available from Government sources and the open literature. Future waste generation rates and quantities to be accumulated over the remainder of this century are also presented, based on a present projection of US commercial nuclear power growth and expected defense-related activities. Spent fuel projections are based on the current DOE/EIA estimate of nuclear growth, which projects 180 GW(e) in the year 2000. It is recognized that the calculated spent fuel discharges are probably high in view of recent reactor cancellations; hence adjustments will be made in future updates of this report. Wastes considered, on a chapter-by-chapter basis, are: spent fuel, high-level wastes, transuranic wastes, low-level wastes, mill tailings (active sites), and remedial action wastes. The latter category includes mill tailings (inactive sites), surplus facilities, formerly utilized sites, and the Grand Junction Project. For each category, waste volume inventories and projections are given through the year 2000. The land usage requirements are given for storage/disposal of low-level and transuranic wastes, and for present inventories of mill tailings

  14. The ABAG biogenic emissions inventory project

    Science.gov (United States)

    Carson-Henry, C. (Editor)

    1982-01-01

    The ability to identify the role of biogenic hydrocarbon emissions in contributing to overall ozone production in the Bay Area, and to identify the significance of that role, were investigated in a joint project of the Association of Bay Area Governments (ABAG) and NASA/Ames Research Center. Ozone, which is produced when nitrogen oxides and hydrocarbons combine in the presence of sunlight, is a primary factor in air quality planning. In investigating the role of biogenic emissions, this project employed a pre-existing land cover classification to define areal extent of land cover types. Emission factors were then derived for those cover types. The land cover data and emission factors were integrated into an existing geographic information system, where they were combined to form a Biogenic Hydrocarbon Emissions Inventory. The emissions inventory information was then integrated into an existing photochemical dispersion model.

  15. TRIM timber projections: an evaluation based on forest inventory measurements.

    Science.gov (United States)

    John R. Mills

    1989-01-01

    Two consecutive timberland inventories collected from permanent plots in the natural pine type in North Carolina were used to evaluate the timber resource inventory model (TRIM). This study compares model predictions with field measurements and examines the effect of inventory data aggregation on the accuracy of projections. Projections were repeated for two geographic...

  16. Data Driven Tuning of Inventory Controllers

    DEFF Research Database (Denmark)

    Huusom, Jakob Kjøbsted; Santacoloma, Paloma Andrade; Poulsen, Niels Kjølstad

    2007-01-01

    A systematic method for criterion based tuning of inventory controllers based on data-driven iterative feedback tuning is presented. This tuning method circumvent problems with modeling bias. The process model used for the design of the inventory control is utilized in the tuning...... as an approximation to reduce time required on experiments. The method is illustrated in an application with a multivariable inventory control implementation on a four tank system....

  17. Inventory management and control at the central distribution center for Univar Products International B.V.

    NARCIS (Netherlands)

    Pholnukulkit, Pimara

    2008-01-01

    This report presents the outcome of the Logistics Design Project carried out for Univar Products International B.V. The goal of this project is to design an inventory control system and implement an inventory control tool that supports decisions in managing inventory of all products in the central

  18. COMPUTER ASSISTED INVENTORY CONTROL SYSTEM ...

    African Journals Online (AJOL)

    issue in supply chain inventory manugement is to coordinate .... A supply chain is a network of organizations that are involved in the ... make decisions, which result in sub-optimization. ... same time reduce the ultimate cost of finished goods.

  19. Inventory management systems : Control and information issues

    NARCIS (Netherlands)

    Janssen, F.B.S.L.P.

    1998-01-01

    This dissertation addresses the management of inventory systems. The thesis starts with an exposition on mathematical models that can be used in inventory theory. Then we deal with some information issues related to the demand process. Namely, how to control products that have intermittent demand.

  20. Projecting national forest inventories for the 2000 RPA timber assessment.

    Science.gov (United States)

    John R. Mills; Xiaoping. Zhou

    2003-01-01

    National forest inventories were projected in a study that was part of the 2000 USDA Forest Service Resource Planning Act (RPA) timber assessment. This paper includes an overview of the status and structure of timber inventory of the National Forest System and presents 50-year projections under several scenarios. To examine a range of possible outcomes, results are...

  1. Optimal Control Inventory Stochastic With Production Deteriorating

    Science.gov (United States)

    Affandi, Pardi

    2018-01-01

    In this paper, we are using optimal control approach to determine the optimal rate in production. Most of the inventory production models deal with a single item. First build the mathematical models inventory stochastic, in this model we also assume that the items are in the same store. The mathematical model of the problem inventory can be deterministic and stochastic models. In this research will be discussed how to model the stochastic as well as how to solve the inventory model using optimal control techniques. The main tool in the study problems for the necessary optimality conditions in the form of the Pontryagin maximum principle involves the Hamilton function. So we can have the optimal production rate in a production inventory system where items are subject deterioration.

  2. INCAP - Applying short-term flexibility to control inventories

    OpenAIRE

    Lödding , Hermann; Lohmann , Steffen

    2011-01-01

    Abstract Inventory Based Capacity Control (INCAP) is a very simple method that allows inventory levels to be effectively controlled by using short-term capacity flexibility in make-to-stock settings. Moreover, INCAP can be used for finished goods inventories as well as for semi-finished goods inventories. The basic idea is to define upper and lower inventory limits and to adjust capacities if the inventory level reaches either limit. Should the inventory fall below the lower limit,...

  3. Emissions inventories and options for control SUMMARY REPORT

    NARCIS (Netherlands)

    Swart RJ; Amstel AR van; Born GJ van den; Kroeze C; MTV; LAE

    1994-01-01

    This report is the final summary report of the project "Social causes of the greenhouse effect ; emissions inventories and options for control", funded by the National Research Programme on Global Air Pollution and Climate Change (NRP) and the Environment Directorate of the Ministry of Housing,

  4. Inventory control in case of unknown demand and control parameters

    NARCIS (Netherlands)

    Janssen, E.

    2010-01-01

    This thesis deals with unknown demand and control parameters in inventory control. Inventory control involves decisions on what to order when and in what quantity. These decisions are based on information about the demand. Models are constructed using complete demand information; these models ensure

  5. ICPP water inventory study project summary report

    International Nuclear Information System (INIS)

    Richards, B.T.

    1994-01-01

    The Idaho Chemical Processing Plant (ICPP) Water inventory Study was initiated in September 1993 with the formation of a joint working group consisting of representatives from DOE-ID, State of Idaho INEL Oversight Program, US Geological Survey, and INEL employees to investigate three issues that had been identified by the INEL Oversight Program at ICPP: (1) the water inventory imbalance at ICPP, (2) the source of water infiltrating into the Tank Farm vault sumps, and (3) the source of water providing potential recharge to perched water bodies underlying ICPP. These issues suggested that water was being lost from the ICPP distribution system. The INEL Oversight Program was concerned that the unaccounted for water at ICPP could be spreading contaminants that have been released over the past 40 years of operations of ICPP, possibly to the Snake River Plain Aquifer. This report summarizes the findings of each of the component investigations that were undertaken to resolve each of the three issues. Concerns about the risk of spreading contaminants will be resolved as part of the Remedial Investigation/Feasibility Study being undertaken at ICPP in compliance with the Federal Facility Agreement and Consent Order between DOE-H), EPA, and the State of Idaho. This report will be a key input to that study

  6. Automated refueling inventory control system at FFTF

    International Nuclear Information System (INIS)

    Ordonez, C.R.

    1983-10-01

    The Refueling Inventory Control System (RICS) at the Fast Flux Test Facility (FFTF) keeps track of all assemblies that reside in the various refueling facilities. The automated RICS allows the user to obtain information regarding any assembly under its control by displaying the data on a screen. It also provides a simulation mode which allows assembly moves on a duplicated data base. This simulation is used to verify the refueling documentation before it is issued

  7. Optimization of Inventories for Multiple Companies by Fuzzy Control Method

    OpenAIRE

    Kawase, Koichi; Konishi, Masami; Imai, Jun

    2008-01-01

    In this research, Fuzzy control theory is applied to the inventory control of the supply chain between multiple companies. The proposed control method deals with the amountof inventories expressing supply chain between multiple companies. Referring past demand and tardiness, inventory amounts of raw materials are determined by Fuzzy inference. The method that an appropriate inventory control becomes possible optimizing fuzzy control gain by using SA method for Fuzzy control. The variation of ...

  8. Controlling Inventory: Real-World Mathematical Modeling

    Science.gov (United States)

    Edwards, Thomas G.; Özgün-Koca, S. Asli; Chelst, Kenneth R.

    2013-01-01

    Amazon, Walmart, and other large-scale retailers owe their success partly to efficient inventory management. For such firms, holding too little inventory risks losing sales, whereas holding idle inventory wastes money. Therefore profits hinge on the inventory level chosen. In this activity, students investigate a simplified inventory-control…

  9. Joint inventory control and pricing in a service-inventory system

    DEFF Research Database (Denmark)

    Marand, Ata Jalili; Li, Hongyan Jenny; Thorstenson, Anders

    2017-01-01

    This study addresses joint inventory control and pricing decisions for a service-inventory system. In such a system both an on-hand inventory item and a positive service time are required to fulfill customer demands. The service-inventory system also captures main features of the classical...... inventory systems with a positive processing time, e.g., make-to-order systems. In this study, the service-inventory system is modeled as an M/M/1 queue in which the customer arrival rate is price dependent. The inventory of an individual item is continuously reviewed under an (r,Q) policy....... The replenishment lead times of the inventory are exponentially distributed. Furthermore, customers arriving during stock-out periods are lost. The stochastic customer inter-arrival times, service times, and inventory replenishment lead times cause the high complexity of the problem and the difficulty in solving it...

  10. Project of an information integrated system to provide support to the regulatory control of the radioactive waste inventory; Projeto de um sistema integrado de informacao para suporte ao controle regulatorio do inventario de rejeitos radioativos

    Energy Technology Data Exchange (ETDEWEB)

    Christovao, Marilia Tavares

    2005-05-15

    Sources and radioactive waste deriving from industry activities, medical practice and other areas are collected, received, and stored as waste on Brazilian Nuclear Energy Commission (CNEN) Institutes, that also generate, treat and store their own radioactive waste. The object of this project is to present an Integrated Information System named SICORR, having as guidelines, the referred processes to the radioactive waste regulatory control, under the responsibility of the Radioactive Waste Division (DIREJ), the General Coordination of Licensing and Control (CGLC), the Directorate of Safety and Radiation Protection (DRS) and the CNEN. The main objective of the work was reached, once the project SICORR modeling considers the radioactive waste control inventory, enclosing the treatment and integration of the radioactive waste and the radionuclides data and processes; the installations that produce, use, transport or store radiation sources data; and, CNEN Institutes responsible for the radioactive waste management data. The SICORR functions or essential modules involve the data treatment, integration, standardization and consistency between the processes. The SICORR specification and the analysis results are registered in documents, Software Specification Proposal (PESw) and Software Requirements Specification (ERSw), and are presented in text, in diagrams and user interfaces. Use cases have been used in the SICORR context diagram. The user interfaces for each use case have been detailed, defining the graphical layout, the relationships description with other interfaces, the interface details properties and the commands and the product entrances and exits. For objects radioactive waste and radionuclides, states diagrams have been drawn. The activities diagram represents the business model process. The class diagram represents the static objects and relationships that exist between them, under the specification point of view. The class diagram have been determined

  11. 19 CFR 146.93 - Inventory control and recordkeeping system.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Inventory control and recordkeeping system. 146.93... § 146.93 Inventory control and recordkeeping system. (a) Attribution. All final products removed from or... provided for under § 146.95(b) of this subpart. (3) Other inventory method. An operator may use the FIFO...

  12. Analysis of inventory difference using fuzzy controllers

    International Nuclear Information System (INIS)

    Zardecki, A.

    1994-01-01

    The principal objectives of an accounting system for safeguarding nuclear materials are as follows: (a) to provide assurance that all material quantities are present in the correct amount; (b) to provide timely detection of material loss; and (c) to estimate the amount of any loss and its location. In fuzzy control, expert knowledge is encoded in the form of fuzzy rules, which describe recommended actions for different classes of situations represented by fuzzy sets. The concept of a fuzzy controller is applied to the forecasting problem in a time series, specifically, to forecasting and detecting anomalies in inventory differences. This paper reviews the basic notion underlying the fuzzy control systems and provides examples of application. The well-known material-unaccounted-for diffusion plant data of Jaech are analyzed using both feedforward neural networks and fuzzy controllers. By forming a deference between the forecasted and observed signals, an efficient method to detect small signals in background noise is implemented

  13. Emissions inventories and options for control. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    Swart, R.J.; Van Amstel, A.R.; Van den Born, G.J.; Kroeze, C.

    1995-10-01

    This report is the final summary report of the project `Social causes of the greenhouse effect, emissions inventories and options for control`. The objectives of the project, that started in 1990, were to support the development of a comprehensive Dutch climate policy and to identify gaps in the knowledge about sources of greenhouse gases. The four phases of the project are summarized. In the first phase, a first national inventory of greenhouse gas emissions was made, capturing carbon dioxide (CO{sub 2}), chlorofluorocarbons (CFCs), methane (CH{sub 4}), nitrous oxide (N{sub 2}O) and the ozone precursors carbon monoxide (CO), nitrogen oxides (NO{sub x} ) and volatile organic compounds (VOC). In the second phase, the acquired expertise was used to support the development of Guidelines for National Emissions Inventories by the joint OECD/IPCC programme through workshop organization and participation in the international planning group. In the third phase, a detailed analysis was performed of the sources of methane, its current and future emissions and the options for control. Finally, a similar analysis was performed for nitrous oxide. In these studies, it was found that policies not specifically aiming at mitigating climate change, would help to control the emissions of the non-CO{sub 2} greenhouse gases. While for methane, national emissions would even decrease because of measures in the livestock management and waste disposal sectors, for nitrous oxide the reductions in agricultural emissions would be outweighed by increases, especially in the transportation sector. The project shows that the application of more detailed information leads to differences with the Guidelines, both because of the limited number of source categories in the Guidelines and because of different, locally specific emissions factors. 4 figs., 2 tabs., 14 refs.

  14. Spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1984-09-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy (DOE) radioactive wastes were compiled through December 31, 1983, based on the most reliable information available from government sources and the open literature, technical reports, and direct contacts. Future waste and spent fuel to be generated over the next 37 years and characteristics of these materials are also presented, consistent with the latest DOE/Energy Information Administration (EIA) or projection of US commercial nuclear power growth and expected defense-related and private industrial and institutional activities. Materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, airborne waste, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated, based on reported or calculated isotopic compositions. 48 figures, 107 tables

  15. 10 CFR 74.43 - Internal controls, inventory, and records.

    Science.gov (United States)

    2010-01-01

    ..., inventory, and recordkeeping capabilities required in paragraphs (b), (c), and (d) of this section. (b...) Provides current knowledge of SNM items with respect to identity, element and isotope content, and stored... measurements for the licensee. (c) Inventory control and physical inventories. The licensee shall: (1) Provide...

  16. On Inventory Control For Perishable Inventory Systems Subject To Uncertainties On Customer Demands

    OpenAIRE

    Abbou , Rosa; Loiseau , Jean-Jacques; Khaldi , Hajer; Farraa , Berna ,

    2017-01-01

    International audience; This paper deals with the inventory controller design for constrained production systems subject to uncertainties on the customer demands. The case study focuses on the inventory regulation problem in production systems where contain perishable finite products. Such systems are characterized by the presence of delays due to production processes, and constraints from the instantaneous inventory level, production level and the finite capacities of stocks. To do that, we ...

  17. Spent fuel and radioactive-waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1982-10-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled, based on the most reliable information available from government sources and the open literature, technical reports, and direct contacts. Future waste and spent fuel to be generated over the next 40 years, and characteristics of these materials are also presented, based on a present DOE/EIA projection of US commercial nuclear power growth and expected defense-related and industrial and institutional activities. Materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level waste, transuranic waste, low-level waste, remedial action waste, active uranium mill tailings, airborne waste, and decommissioning. For each category, current and projected inventories are given through the year 2020. The land usage requirements are given for storage/disposal of low-level and transuranic wastes, and for the present inventories of inactive uranium mill tailings. For each waste category the radioactivity and thermal power are calculated. Isotopic compositions and cost data are given for each waste type and for spent fuel

  18. Spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1983-09-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled through December 31, 1982, based on the most reliable information available from government sources and the open literature, technical reports, and direct contacts. Future waste and spent fuel to be generated over the next 40 years and characteristics of these materials are also presented, based on the latest DOE/EIA projection of US commercial nuclear power growth and expected defense-related and industrial and institutional activities. Materials considered, on a chapter-by-chapter bases, are: spent fuel, high-level waste, transuranic waste, low-level waste, active uranium mill tailings, airborne waste, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated, based on reported or calculated isotopic compositions. One chapter gives broad, summary data on the costs of spent fuel and radioactive waste management and disposal to provide an economic perspective. This chapter is not intended as a definitive guide, but it is a source of reasonable, order-of-magnitude costs and also provides references to more-detailed and scenario-specific studies. An appendix on generic flowsheets and source terms used for the projections is also included

  19. A Control Systems Concept Inventory Test Design and Assessment

    Science.gov (United States)

    Bristow, M.; Erkorkmaz, K.; Huissoon, J. P.; Jeon, Soo; Owen, W. S.; Waslander, S. L.; Stubley, G. D.

    2012-01-01

    Any meaningful initiative to improve the teaching and learning in introductory control systems courses needs a clear test of student conceptual understanding to determine the effectiveness of proposed methods and activities. The authors propose a control systems concept inventory. Development of the inventory was collaborative and iterative. The…

  20. Real-time plutonium accountability and inventory control system

    International Nuclear Information System (INIS)

    Sarich, J.P.

    An on-line inventory system for a large storage and processing facility is planned. A terminal system will provide for interactive updating and information retrieval. The data base will contain information on inventory items and transactions, as well as process monitoring information and laboratory bookkeeping data. Access to the terminals, as well as the storage vaults, will be controlled by fingerprint comparison with a personnel identification data base. Bar code labels attached to each inventory item will be read by a light pen during physical inventories and when materials are transferred. The use of devices to continuously monitor and control storage locations within the vaults is planned. (U.S.)

  1. Real-time plutonium accountability and inventory control system

    International Nuclear Information System (INIS)

    Sarich, J.P.

    1975-01-01

    An on-line inventory system for a large storage and processing facility is planned. A terminal system will provide for interactive updating and information retrieval. The data base will contain information on inventory items and transactions, as well as process monitoring information and laboratory bookkeeping data. Access to the terminals, as well as the storage vaults, will be controlled by fingerprint comparison with a personnel identification data base. Bar code labels attached to each inventory item will be read by a light pen during physical inventories and when material is transferred. The use of devices to continuously monitor and control s locations within the vaults is planned

  2. Hanford regulated laundry: inventory control and production improvement study

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, C. J.; Imhoff, C. H.; Levine, L. O.

    1986-04-01

    The purpose of this report is to assist the Hanford regulated laundry facility in reducing processing costs and in improving facility performance. Specific problem areas addressed were: no method for determining optimum manpower requirements, resulting in excessive amounts of employee overtime; no buffer inventory available to offset demand peaks, resulting in additional employee overtime and unmet demand; lack of adequate inventory control, resulting in unnecessary inventory costs; and no detailed analysis of the impact of 100% monitoring.

  3. Cultural Resource Inventory of Lands in and Adjacent to the City of Rochester, Minnesota Flood Control Project on the South Fork Zumbro River,

    Science.gov (United States)

    1981-09-14

    the area directly east of present- day Rochester contained fire-maintained oak openings and barrens . This area consisted of oak groves or single trees...Archaeological Survey of Lands Adjacent to the Pine River Reservoir; University of Minnesota and St. Paul District Corps of Engineers; Archaeological Field...Archaeological Field Services, Inc.; Principal Investigator. 1980 An Archaeological Reconnaissance Survey of the Harrison Hills Project, Plymouth , Hennepin

  4. Savannah River Plant's Accountability Inventory Management System (AIMS) (Nuclear materials inventory control)

    International Nuclear Information System (INIS)

    Croom, R.G.

    1976-06-01

    The Accountability Inventory Management System (AIMS) is a new computer inventory control system for nuclear materials at the Savannah River Plant, Aiken, South Carolina. The system has two major components, inventory files and system parameter files. AIMS, part of the overall safeguards program, maintains an up-to-date record of nuclear material by location, produces reports required by ERDA in addition to onplant reports, and is capable of a wide range of response to changing input/output requirements through use of user-prepared parameter cards, as opposed to basic system reprogramming

  5. Labour Costs for Inventory Control Less Expensive than Repurchasing. A Review of: Sung, J. S., Whisler, J. A., & Sung, N. (2009. A cost-benefit analysis of a collections inventory project: A statistical analysis of inventory data from a medium-sized academic library. Journal of Academic Librarianship, 35(4, 314-323.

    Directory of Open Access Journals (Sweden)

    Laura Newton Miller

    2010-09-01

    % misplaced more than 100 books away from the correct position. In general, 82% of mis-shelved books were found within 1 to 25 books away from their correct location. By calculating that 5300 books were mis-shelved beyond 25 books away from their proper position, labour costs were estimated to be at least $159,000 USD (5300 x $30.00 USD per book in labour costs. Costs for interlibrary loan were calculated at approximately $30.00 USD per transaction, and patron’s time wasted trying to locate misplaced books was estimated at 30 minutes per book. This was much more than the labour costs associated with scanning books, which at an average speed of 8 seconds per book and $10.00 US per hour for scanning worked out to be 2.2 cents per book, or $11,000 USD to scan the entire half-million monograph collection.Conclusion – The results appear to reveal that the labour costs for inventory control are less expensive than repurchasing or borrowing the same number of books.

  6. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    Science.gov (United States)

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  7. Materials control and accountability challenges associated with plutonium inventories

    International Nuclear Information System (INIS)

    Crawford, D.W.

    1996-01-01

    There are currently many initiatives underway within the Department of Energy (DOE) to safely and securely manage large plutonium inventories arising from weapons dismantlement, changing missions and facility operations. Plutonium inventory information is increasingly accessible to the public as a result of the secretary of energy's openness initiative. As a result, knowledge of these inventories and levels to which the department has accounted for and controlled these inventories, will be under increased scrutiny from a variety of interest groups. The quality of this accountability data and what this data means will greatly influence the public's perception of how the US is protecting its plutonium inventories. In addition, the department's safeguards program provides an essential basis for the application of International Atomic Energy Agency (IAEA) safeguards that, in addition to possibly other international control regimes, will be in place over a large portion of these future inventories. The capability and functionality of the department's nuclear safeguards program will be important contributors to the success of US programs for the responsible stewardship of these vast plutonium inventories. This paper discusses some of the challenges, in terms of specific issues relating to one part of the department's safeguards program--materials control and accountability (MC and A)--to meet the growing domestic and international requirements and expectations associated with these plutonium inventories

  8. Materials control and accountability challenges associated with plutonium inventories

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, D.W. [USDOE Office of Safeguards and Security, Washington, DC (United States)

    1996-07-01

    There are currently many initiatives underway within the Department of Energy (DOE) to safely and securely manage large plutonium inventories arising from weapons dismantlement, changing missions and facility operations. Plutonium inventory information is increasingly accessible to the public as a result of the secretary of energy`s openness initiative. As a result, knowledge of these inventories and levels to which the department has accounted for and controlled these inventories, will be under increased scrutiny from a variety of interest groups. The quality of this accountability data and what this data means will greatly influence the public`s perception of how the US is protecting its plutonium inventories. In addition, the department`s safeguards program provides an essential basis for the application of International Atomic Energy Agency (IAEA) safeguards that, in addition to possibly other international control regimes, will be in place over a large portion of these future inventories. The capability and functionality of the department`s nuclear safeguards program will be important contributors to the success of US programs for the responsible stewardship of these vast plutonium inventories. This paper discusses some of the challenges, in terms of specific issues relating to one part of the department`s safeguards program--materials control and accountability (MC and A)--to meet the growing domestic and international requirements and expectations associated with these plutonium inventories.

  9. Inventory control with multiple setup costs

    NARCIS (Netherlands)

    Alp, O.; Huh, W.T.; Tan, T.

    2014-01-01

    We consider an infinite-horizon, periodic-review, single-item production/inventory system with random demand and backordering, where multiple setups are allowed in any period and a separate fixed cost is associated for each setup. Contrary to the majority of the literature on this topic, we do not

  10. Inventory Control of Spare Parts for Operating Nuclear Power plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jong-Hyuck; Jang, Se-Jin; Hwang, Eui-Youp; Yoo, Sung-Soo; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    2006-07-01

    Inventory control of spare parts plays an increasingly important role in operation management. The trade-off is clear: on one hand a large number of spare parts ties up a large amount of capital, while on the other hand too little inventory may result in extremely costly emergency actions. This is why during the last few decades inventory of spare parts control has been the topics of many publications. Recently management systems such as manufacturing resources planning (MRP) and enterprise resource planning (ERP) have been added. However, most of these contributions have similar theoretical background. This means the concepts and techniques are mainly based on mathematical assumptions and modeling inventory of spare parts situations Nuclear utilities in Korea have several problems to manage the optimum level of spare parts though they used MRP System. Because most of items have long lead time and they are imported from United States, Canada, France and so on. In this paper, we will examine the available inventory optimization models which are applicable to nuclear power plant and then select optimum model and assumptions to make inventory of spare parts strategies. Then we develop the computer program to select and determine optimum level of spare parts which should be automatically controlled by KHNP ERP system. The main contribution of this paper is an inventory of spare parts control model development, which can be applied to nuclear power plants in Korea.

  11. Inventory Control of Spare Parts for Operating Nuclear Power plants

    International Nuclear Information System (INIS)

    Park, Jong-Hyuck; Jang, Se-Jin; Hwang, Eui-Youp; Yoo, Sung-Soo; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull

    2006-01-01

    Inventory control of spare parts plays an increasingly important role in operation management. The trade-off is clear: on one hand a large number of spare parts ties up a large amount of capital, while on the other hand too little inventory may result in extremely costly emergency actions. This is why during the last few decades inventory of spare parts control has been the topics of many publications. Recently management systems such as manufacturing resources planning (MRP) and enterprise resource planning (ERP) have been added. However, most of these contributions have similar theoretical background. This means the concepts and techniques are mainly based on mathematical assumptions and modeling inventory of spare parts situations Nuclear utilities in Korea have several problems to manage the optimum level of spare parts though they used MRP System. Because most of items have long lead time and they are imported from United States, Canada, France and so on. In this paper, we will examine the available inventory optimization models which are applicable to nuclear power plant and then select optimum model and assumptions to make inventory of spare parts strategies. Then we develop the computer program to select and determine optimum level of spare parts which should be automatically controlled by KHNP ERP system. The main contribution of this paper is an inventory of spare parts control model development, which can be applied to nuclear power plants in Korea

  12. Optimal Acquisition and Inventory Control for a Remanufacturing System

    Directory of Open Access Journals (Sweden)

    Zhigang Jiang

    2013-01-01

    Full Text Available Optimal acquisition and inventory control can often make the difference between successful and unsuccessful remanufacturing. However, there is a greater degree of uncertainty and complexity in a remanufacturing system, which leads to a critical need for planning and control models designed to deal with this added uncertainty and complexity. In this paper, a method for optimal acquisition and inventory control of a remanufacturing system is presented. The method considers three inventories, one for returned item and the other for serviceable and recoverable items. Taking the holding cost for returns, recoverable and remanufactured products, remanufacturing cost, disposal cost, and the loss caused by backlog into account, the optimal inventory control model is established to minimize the total costs. Finally, a numerical example is provided to illustrate the proposed methods.

  13. Inventory of cassava plant protection and development projects in ...

    African Journals Online (AJOL)

    A total of 303 cassava protection and development projects were identified of which about half are plant protection-oriented. Most activities on cassava protection have been centred on biological control and host plant resistance. The least activity has been on chemical control. The applicability of the collected database is ...

  14. Optimal Inventory Control with Advance Supply Information

    Directory of Open Access Journals (Sweden)

    Marko Jaksic

    2016-09-01

    Full Text Available It has been shown in numerous situations that sharing information between the companies leads to improved performance of the supply chain. We study a positive lead time periodic-review inventory system of a retailer facing stochastic demand from his customer and stochastic limited supply capacity of the manufacturer supplying the products to him. The consequence of stochastic supply capacity is that the orders might not be delivered in full, and the exact size of the replenishment might not be known to the retailer. The manufacturer is willing to share the so-called advance supply information (ASI about the actual replenishment of the retailer's pipeline order with the retailer. ASI is provided at a certain time after the orders have been placed and the retailer can now use this information to decrease the uncertainty of the supply, and thus improve its inventory policy. For this model, we develop a dynamic programming formulation, and characterize the optimal ordering policy as a state-dependent base-stock policy. In addition, we show some properties of the base-stock level. While the optimal policy is highly complex, we obtain some additional insights by comparing it to the state-dependent myopic inventory policy. We conduct the numerical analysis to estimate the in uence of the system parameters on the value of ASI. While we show that the interaction between the parameters is relatively complex, the general insight is that due to increasing marginal returns, the majority of the benets are gained only in the case of full, or close to full, ASI visibility.

  15. Projecting other public inventories for the 2005 RPA timber assessment update.

    Science.gov (United States)

    Xiaoping Zhou; John R. Mills; Richard W. Haynes

    2007-01-01

    This study gives an overview of the current inventory status and the projection of future forest inventories on other public timberland. Other public lands are lands administered by state, local, and federal government but excluding National Forest System lands. These projections were used as part of the 2005 USDA Forest Service Resource Planning Act timber assessment...

  16. The School Building Principal and Inventory Control: A Case for Computerization.

    Science.gov (United States)

    Stronge, James

    1987-01-01

    General and special purpose database programs are appropriate for inventory control at the school building level. A fixed asset equipment inventory example illustrates the feasibility of computerized inventory control. (MLF)

  17. Emissions inventories and options for control

    Energy Technology Data Exchange (ETDEWEB)

    Swart, R.J.; Van Amstel, A.R.; Van den Born, G.J.; Kroeze, C. [National Inst. of Public Health and Environmental Protection, Bilthoven (Netherlands)

    1995-11-01

    In 1990, little was known about the emissions of greenhouse gases in the Netherlands, notably those of the non-CO{sub 2} greenhouse gases. Uncertainties included the causes, the emissions factors and the regional distribution of emissions. The main objectives of the project at that time were formulated as follows: (a) provide information for prioritizing greenhouse gas emissions research in the Netherlands; (b) provide input data for global models (later shifted to the EDGAR-project); and (c) support national and international policy development. The emphasis of the project was on non-CO{sub 2} greenhouse gases, notably methane (CH{sub 4}) and nitrous oxide (N{sub 2}O). While state-of-the-art information from international research would be used and analyzed, the focus of the project was on the Dutch emissions and their causes. Information was drawn from literature research, discussions with national and international experts, and experimental information from several projects. 2 figs., 12 refs.

  18. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  19. Integral inventory control in spare parts networks with capacity restrictions

    NARCIS (Netherlands)

    Sleptchenko, Andrei

    2002-01-01

    Integral inventory control of repairable items in service networks can result in a significant gain compared to traditional local control mechanisms, in terms of both efficiency and customer service. Research on quantitative decision support models has yielded various useful results. However, in

  20. The order and volume fill rates in inventory control systems

    DEFF Research Database (Denmark)

    Thorstenson, Anders; Larsen, Christian

    2014-01-01

    This paper differentiates between an order (line) fill rate and a volume fill rate and specifies their performance for different inventory control systems. When the focus is on filling complete customer orders rather than total demanded quantity the order fill rate would be the preferred service...... level measure. The main result shows how the order and volume fill rates are related in magnitude. Earlier results derived for a single-item, single-stage, continuous review inventory system with backordering and constant lead times controlled by a base-stock policy are extended in different directions...... extensions consider more general inventory control review policies with backordering, as well as some relations between service measures. A particularly important result in the paper concerns an alternative service measure, the customer order fill rate, and shows how this measure always exceeds the other two...

  1. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  2. The order and volume fill rates in inventory control systems

    DEFF Research Database (Denmark)

    Thorstenson, Anders; Larsen, Christian

    2011-01-01

    This paper differentiates between an order (line) fill rate and a volume fill rate and specifies their performance for different inventory control systems. When the focus is on filling complete customer orders rather than total quantities the order fill rate would be the preferred service level...... measure. The main result shows how the order and volume fill rates are related in magnitude. Earlier results derived for a single-item, single-stage, continuous review inventory system with backordering and constant lead times controlled by a base-stock policy are extended in different directions...

  3. Connecting inventory control and repair shop control : a differentiated control structure for repairable spare parts

    NARCIS (Netherlands)

    Driessen, M.A.; Rustenburg, W.D.; Houtum, van G.J.J.A.N.; Wiers, V.C.S.

    2014-01-01

    This paper presents a control structure for integrating decisions on spare parts inventory control and the control of repair shops for maintenance spare parts. A dierentiated control structure is proposed for the various repair shop types recognized in practice. Decisions functions are mapped and

  4. Radioactive material inventory control at a waste characterization facility

    International Nuclear Information System (INIS)

    Yong, L.K.; Chapman, J.A.; Schultz, F.J.

    1996-01-01

    Due to the recent introduction of more stringent Department of Energy (DOE) regulations and requirements pertaining to nuclear and criticality safety, the control of radioactive material inventory has emerged as an important facet of operations at DOE nuclear facilities. In order to comply with nuclear safety regulations and nuclear criticality requirements, radioactive material inventories at each nuclear facility have to be maintained below limits specified for the facility in its safety authorization basis documentation. Exceeding these radioactive material limits constitutes a breach of the facility's nuclear and criticality safety envelope and could potentially result in an accident, cause a shut-down of the facility, and bring about imminent regulatory repercussions. The practice of maintaining control of radioactive material, especially sealed and unsealed sources, is commonplace and widely implemented; however, the requirement to track the entire radioactivity inventory at each nuclear facility for the purpose of ensuring nuclear safety is a new development. To meet the new requirements, the Applied Radiation Measurements Department at Oak Ridge National Laboratory (ORNL) has developed an information system, called the open-quotes Radioactive Material Inventory Systemclose quotes (RMIS), to track the radioactive material inventory at an ORNL facility, the Waste Examination and Assay Facility (WEAF). The operations at WEAF, which revolve around the nondestructive assay and nondestructive examination of waste and related research and development activities, results in an ever-changing radioactive material inventory. Waste packages and radioactive sources are constantly being brought in or taken out of the facility; hence, use of the RMIS is necessary to ensure that the radioactive material inventory limits are not exceeded

  5. A Modular Integrated RFID System for Inventory Control Applications

    Directory of Open Access Journals (Sweden)

    Ross Bunker

    2017-01-01

    Full Text Available Recent advances in single-board computer technology have allowed for lightweight, power-efficient devices, such as the Raspberry Pi, to take the place of desktop PCs in certain applications. This has the potential to disrupt the way many current systems are structured, particularly for inventory management and control applications. In this paper, we explore the design and topology of a modular Radio frequency identification (RFID system for inventory management comprised of self-contained, autonomous scanning, and stationary control PCs in a handheld/portable configuration. While similar solutions for such a system may exist on the commercial market, this proposed development provides a template for an open source flexible, low-cost solution that can be easily expanded to meet the needs of businesses with large and small inventories.

  6. HALL project. Justifying synthesis of the dimensioning inventory model

    International Nuclear Information System (INIS)

    Lagrange, M.H.

    2003-01-01

    This document explains the input data and the hypotheses retained for the establishment of the dimensioning inventory model (DIM). It recalls, first, the scenarios considered for the spent fuel and reprocessing management, describes the updating of the list of families of high-activity and long living (HALL) waste packages and the hypotheses considered for their quantifying in the inventory model. It presents also the selection criteria of type-packages and the list of such packages. It precises the regrouping of package families into type-packages and the related quantitative data. Finally, it details the modalities of preparation of radiological and chemical description of type-packages. (J.S.)

  7. The order and volume fill rates in inventory control systems

    DEFF Research Database (Denmark)

    Thorstenson, Anders; Larsen, Christian

    2011-01-01

    This paper differentiates between an order (line) fill rate and a volume fill rate and specifies their performance for different inventory control systems. When the focus is on filling complete customer orders rather than total quantities the order fill rate would be the preferred service level m...

  8. Implementing Lean Six Sigma to achieve inventory control in supply chain management

    Science.gov (United States)

    Hong, Chen

    2017-11-01

    The inventory cost has important impact on the production cost. In order to get the maximum circulation of funds of enterprise with minimum inventory cost, the inventory control with Lean Six Sigma is presented in supply chain management. The inventory includes both the raw material and the semi-finished parts in manufacturing process. Though the inventory is often studied, the inventory control in manufacturing process is seldom mentioned. This paper reports the inventory control from the perspective of manufacturing process by using statistical techniques including DMAIC, Control Chart, and Statistical Process Control. The process stability is evaluated and the process capability is verified with Lean Six Sigma philosophy. The demonstration in power meter production shows the inventory is decreased from 25% to 0.4%, which indicates the inventory control can be achieved with Lean Six Sigma philosophy and the inventory cost in production can be saved for future sustainable development in supply chain management.

  9. The Aspects Of Inventory Controlling Instruments Implementation In The System Of Retail Chains Finance Management

    OpenAIRE

    Nataliya Buratchuk

    2014-01-01

    The article deals with issues of implementation of inventory controlling instruments in the system of retail chains finance management. The author suggests expanded classification of methods and instruments of inventory controlling distinguishing 3 groups of specific instruments: logistic controlling instruments, expenditures and supply chains controlling instruments and inventory special controlling mechanisms. Based on investigation of controlling methods and instruments, the approximate li...

  10. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  11. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  12. An Improved Inventory Control Model for the Brazilian Navy Supply System

    Science.gov (United States)

    2001-12-01

    Portuguese Centro de Controle de Inventario da Marinha, the Brazilian Navy Inventory Control Point (ICP) developed an empirical model called SPAADA...NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS Approved for public release; distribution is unlimited AN IMPROVED INVENTORY CONTROL ...AN IMPROVED INVENTORY CONTROL MODEL FOR THE BRAZILIAN NAVY SUPPLY SYSTEM Contract Number Grant Number Program Element Number Author(s) Moreira

  13. An inventory control model for biomass dependent production systems

    International Nuclear Information System (INIS)

    Grado, S.C.; Strauss, C.H.

    1993-01-01

    The financial performance of a biomass dependent production system was critiqued based on the development and validation of an inventory control model. Dynamic programming was used to examine the constraints and capabilities of producing ethanol from various biomass crops. In particular, the model evaluated the plantation, harvest, and manufacturing components of a woody biomass supply system. The optimum wood to ethanol production scheme produced 38 million litres of ethanol in the harvest year, at 13.6 million litre increase over the least optimal policy as demonstrated in the dynamic programming results. The system produced ethanol at a delivered cost of $0.38 L -1 which was consistent with the unit costs from other studies. Nearly 60% of the delivered costs were in ethanol production. The remaining costs were attributed to growing biomass (14%), harvest and shipment of the crop (18%), storage of the raw material and finished product (7%) and open-quotes lost salesclose quotes (2%). Inventory control, in all phases of production, proved to be an important cost consideration throughout the model. The model also analyzed the employment of alternative harvesting policies and the use of different or multiple feedstocks. A comparison between the least cost wood system and an even cut wood system further revealed the benefits of using an inventory control system

  14. An organizational perspective on inventory control : Theory and a case study

    NARCIS (Netherlands)

    Zomerdijk, L.G.; de Vries, J.

    2003-01-01

    Inventory control is a well-covered area in literature. Nowadays, many concepts and techniques are available for effectively controlling inventories. Eminent examples are stochastic models to determine order quantities, techniques for forecasting demand and different kinds of ABC analysis.

  15. NREL: U.S. Life Cycle Inventory Database - About the LCI Database Project

    Science.gov (United States)

    About the LCI Database Project The U.S. Life Cycle Inventory (LCI) Database is a publicly available database that allows users to objectively review and compare analysis results that are based on similar source of critically reviewed LCI data through its LCI Database Project. NREL's High-Performance

  16. Global Inventory and Analysis of Smart Grid Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mulder, W.; Kumpavat, K.; Faasen, C.; Verheij, F.; Vaessen, P [DNV KEMA Energy and Sustainability, Arnhem (Netherlands)

    2012-10-15

    As the key enabler of a more sustainable, economical and reliable energy system, the development of smart grids has received a great deal of attention in recent times. In many countries around the world the benefits of such a system have begun to be investigated through a number of demonstration projects. With such a vast array of projects it can be difficult to keep track of changes, and to understand which best practices are currently available with regard to smart grids. This report aims to address these issues through providing a comprehensive outlook on the current status of smart grid projects worldwide.

  17. Integrated data base report--1995: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1996-12-01

    The information in this report summarizes the U.S. Department of Energy (DOE) data base for inventories, projections, and characteristics of domestic spent nuclear fuel and radioactive waste. This report is updated annually to keep abreast of continual waste inventory and projection changes in both the government and commercial sectors. Baseline information is provided for DOE program planning purposes and to support DOE program decisions. Although the primary purpose of this document is to provide background information for program planning within the DOE community, it has also been found useful by state and local governments, the academic community, and some private citizens

  18. THE CORONAL LOOP INVENTORY PROJECT: EXPANDED ANALYSIS AND RESULTS

    Energy Technology Data Exchange (ETDEWEB)

    Schmelz, J. T. [USRA, 7178 Columbia Gateway Drive, Columbia, MD 21046 (United States); Christian, G. M.; Chastain, R. A., E-mail: jschmelz@usra.edu [Physics Department, University of Memphis, Memphis, TN 38152 (United States)

    2016-11-10

    We have expanded upon earlier work that investigates the relative importance of coronal loops with isothermal versus multithermal cross-field temperature distributions. These results are important for determining if loops have substructure in the form of unresolved magnetic strands. We have increased the number of loops targeted for temperature analysis from 19 to 207 with the addition of 188 new loops from multiple regions. We selected all loop segments visible in the 171 Å images of the Atmospheric Imaging Assembly (AIA) that had a clean background. Eighty-six of the new loops were rejected because they could not be reliably separated from the background in other AIA filters. Sixty-one loops required multithermal models to reproduce the observations. Twenty-eight loops were effectively isothermal, that is, the plasma emission to which AIA is sensitive could not be distinguished from isothermal emission, within uncertainties. Ten loops were isothermal. Also, part of our inventory was one small flaring loop, one very cool loop whose temperature distribution could not be constrained by the AIA data, and one loop with inconclusive results. Our survey can confirm an unexpected result from the pilot study: we found no isothermal loop segments where we could properly use the 171-to-193 ratio method, which would be similar to the analysis done for many loops observed with TRACE and EIT. We recommend caution to observers who assume the loop plasma is isothermal, and hope that these results will influence the direction of coronal heating models and the effort modelers spend on various heating scenarios.

  19. QUANTIFICATION OF THE DECISIONS OF CONTROL AND AUDIT IN INVENTORY MANAGEMENT IN CEMENT INDUSTRY ENTERPRISES

    OpenAIRE

    Sylwia £êgowik-Œwi¹cik

    2011-01-01

    Inventory management in enterprises of cement industry necessitates the assessment of the level of risk which is generated by production inventory. The processes of control and auditing allow for planning, monitoring and organization of inventory management in the analysed business entities. This paper is aimed at presentation of the phase of preparation of audit activities in the area of inventory and verification of model solutions for the processes of control and audit in terms of inventor...

  20. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  1. Solving a Novel Inventory Location Model with Stochastic Constraints and (R,s,S Inventory Control Policy

    Directory of Open Access Journals (Sweden)

    Guillermo Cabrera

    2013-01-01

    Full Text Available We solve a novel inventory-location model with a stochastic capacity constraint based on a periodic inventory control (ILM-PR policy. The ILM-PR policy implies several changes with regard to other previous models proposed in the literature, which consider continuous review as their inventory policy. One of these changes is the inclusion of the undershoot concept, which has not been considered in previous ILM models in the literature. Based on our model, we are able to design a distribution network for a two-level supply chain, addressing both warehouse location and customer assignment decisions, whilst taking into consideration several aspects of inventory planning, in particular, evaluating the impact of the inventory control review period on the network configuration and system costs. Because the model is a very hard-to solve combinatorial nonlinear optimisation problem, we implemented two heuristics to solve it, namely, Tabu Search and Particle Swarm Optimisation. These approaches were tested over small instances in which they were able to find the optimal solution in just a few seconds. Because the model is a new one, a set of medium-size instances is provided that can be useful as a benchmark in future research. The heuristics showed a good convergence rate when applied to those instances. The results confirm that decision making over the inventory control policy has effects on the distribution network design.

  2. Spent fuel and radioactive waste inventories and projections as of December 31, 1980

    International Nuclear Information System (INIS)

    1981-09-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled, based on the most reliable information available from Government sources and the open literature, technical reports, and direct contacts. Future waste generation rates and characteristics of these materials to be accumulated over the remainder of this century are also presented, based on a present DOE/EIA projection of US commercial nuclear power growth and expected defense-related and industrial and institutional activities. Materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level wastes, transuranic waste, low-level waste, remedial action waste, active uranium mill tailings, and airborne waste. For each category, current and projected inventories are given through the year 2000. The land usage requirements are given for storage/disposal of low-level and transuranic wastes, and for the present inventories of inactive uranium mill tailings

  3. Spent fuel and radioactive waste: an integrated data base of inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    Notz, K.J.; Forsberg, C.W.; Mastal, E.F.

    1984-01-01

    The Integrated Data Base (IDB) Program provides official US Department of Energy (DOE) data on spent fuel and radioactive waste inventories, projections, and characteristics. This information is provided through the cooperative efforts of the IDB Program and DOE lead offices, lead sites, major programs, and generator sites. The program is entering its fifth year, and major accomplishments are summarized in three broad areas: (1) the annual inventory report, including ORIGEN2 applications and a Quality Assurance (QA) plan; (2) the summary data file and direct user access; and (3) data processing methodology and support to other programs. Plans for future work in these areas are outlined briefly, including increased utilization of personal computers. Some examples of spent fuel data are given in terms of projected quantities for two growth scenarios, burnup and age profile of the existing inventory, and the approximate specific thermal power relative to high-level waste (HLW) from various sources. 4 refs., 2 figs., 3 tabs

  4. Inventory of the patents and publications of FP7 projects in the field of ICT

    NARCIS (Netherlands)

    Jacob, J.; Sanditov, Bulat; Smirnov, Evgueni; Wintjes, Rene; Surpatean, A.; Notten, Ad; Sasso, Simone

    2015-01-01

    The inventory includes data on 295 patents and 18,158 publications resulting from FP7 funded projects in the field of ICT (ICT theme within Cooperation Programme and eInfrastructures within Capacities Programme). The period covered is 2007 - 2013. Patents and publications have been reported by

  5. Improvement of Inventory Control Using Continuous Review Policy in A Local Hospital at Bandung City, Indonesia

    Directory of Open Access Journals (Sweden)

    Fina Hafnika

    2016-12-01

    Full Text Available Abstract. This research was aimed to analyze the excess inventories issue in pharmacy and medical equipment unit at a local hospital in Bandung which affected the service level of the hospital. As one of the busy hospital in Java, proven by the higher amount of the patient/year than in other average Java typical hospital, the hospital needs to concern about the pharmaceutical and medical equipment inventories in order to fulfill patients’ needs and in the same time keeping the inventory level under control. Therefore, an inventory control evaluation was conducted to determine the appropriate number of inventories and time of order to avoid the excessive goods in central warehouse of the hospital. By using probabilistic inventory model and continuous review policy, the pharmaceutical inventory in the hospital was calculated to compare the ideal and actual amount of the average inventory level (AIL. ABC (Always, Better, Control classification also classified in this research to identify the proper item which potentially can be reduced from the inventory. From the analysis, we have discovered that the hospital potentially able to reduce almost Rp 830 million or 57% from the overstock inventory level by using continuous review policy as the basis of inventory control calculation system. Keywords: Continuous review policy, inventory control, EOQ, ROP, AIL

  6. Automated Inventory Control System for Nigeria Power Holding ...

    African Journals Online (AJOL)

    The company may want to release some capital from its inventory investment by reducing stock levels. In addition, manual ways of handling inventory has failed to cope with factors like ... graphical interface ability for decision making.

  7. Inventory of demonstration and trail projects in sustainable energy and transport in Scandinavia

    DEFF Research Database (Denmark)

    Andersen, Per Dannemand; Cramer-Petersen, Claus Lundgaard; Harnes, Kristian N.

    This report documents the work of work package 2 of the InnoDemo research project funded by the Research Council of Norway. Partners in the project are The Nordic Institute for Studies in Innovation, Research and Education (NIFU) (project leader), DTU Management Engineering at Technical University...... of Denmark, and CIRCLE at Lund’s University. From a state-of-the-art study in the project’s work package 1, a set of characteristics have been specified to be collected in an inventory of demonstration projects and funding programmes. This data was collected in parallel in Denmark, Norway and Sweden...

  8. Project SAFE. Update of the SFR-1 safety assessment. Phase 1. Appendix A1: Inventory

    International Nuclear Information System (INIS)

    Riggare, P.

    1998-01-01

    One of the aims in the safety assessment of SFR-1 is to estimate the release to the environment. In order to make these calculations there is a need to describe the inventory in greater detail. The new computerised database of waste in SFR-1 gives a good possibility to achieve this. The aim for project SAFE is to make both conservative and realistic radionuclide transport calculations. To achieve this goal there must be two inventories. The conservative inventory is the inventory used in the design of the repository, which in most parts is identical with the limits in the licence for SFR-1. There is a great interest to have good estimates of the volumes of the different waste types. A thorough prognosis should be made in 1999, but until then the latest one from 1995 could be used in the calculations. The total (actual) inventory of nuclides is calculated from the measurements of the easy-to-measure nuclides since, in principle, all hard-to-measure nuclides are calculated by correlation factors to 60 Co and 137 Cs . These factors should be reviewed since there are quite large uncertainties involved. 14 C dominates the individual doses after a few hundred years and the collective dose in the inland-scenario. The amount of the nuclide is uncertain since the correlation factor is very uncertain. The chemical speciation of 14 C is also of interest due to different properties of organic and inorganic carbon. 36 Cl is very hard to measure. Although the authorities in their reviews of the safety reports say that there probably are small doses from chlorine, the inventory should be improved. 59 Ni is a long-lived nuclide that sets a limit to the close-to-the-core metal scrap that can be taken to SFR- 1. There is an ongoing research project to provide a better measuring method for 59 Ni. This should make it possible to improve the knowledge about 59 Ni inventory. The assumption that 90 % of the inventory is collected in the ion-exchange resins should be checked. Actinides

  9. The AVI project: A bibliographical and archive inventory of landslides and floods in Italy

    Science.gov (United States)

    Guzzetti, Fausto; Cardinali, Mauro; Reichenbach, Paola

    1994-07-01

    The AVI project was commissioned by the Minister of Civil Protection to the National Group for Prevention of Hydrogeologic Hazards to complete an inventory of areas historically affected by landslides and floods in Italy. More than 300 people, divided into 15 research teams and two support groups, worked for one year on the project. Twenty-two journals were systematically searched for the period 1918 1990, 350,000 newspaper issues were screened, and 39,953 articles were collected. About 150 experts on mass movement and floods were interviewed and 1482 published and unpublished technical and scientific reports were reviewed. The results of the AVI project, in spite of the limitations, represent the most comprehensive archiving of mass movement and floods ever prepared in Italy. The type and quality of the information collected and the methodologies and techniques used to make the inventory are discussed. Possible applications and future developments are also presented.

  10. Integrated data base report - 1994: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1995-09-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and U.S. Department of Energy (DOE) spent nuclear fuel and commercial and U.S. government-owned radioactive wastes. Except for transuranic wastes, inventories of these materials are reported as of December 31, 1994. Transuranic waste inventories are reported as of December 31, 1993. All spent nuclear fuel and radioactive waste data reported are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest DOE/Energy Information Administration (EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program contaminated environmental media, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions

  11. Integrated data base report - 1994: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and U.S. Department of Energy (DOE) spent nuclear fuel and commercial and U.S. government-owned radioactive wastes. Except for transuranic wastes, inventories of these materials are reported as of December 31, 1994. Transuranic waste inventories are reported as of December 31, 1993. All spent nuclear fuel and radioactive waste data reported are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest DOE/Energy Information Administration (EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program contaminated environmental media, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions.

  12. Integrated data base report - 1996: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1997-12-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and U.S. Department of Energy (DOE) spent nuclear fuel (SNF) and commercial and U.S. government-owned radioactive wastes. Inventories of most of these materials are reported as of the end of fiscal year (FY) 1996, which is September 30, 1996. Commercial SNF and commercial uranium mill tailings inventories are reported on an end-of-calendar year (CY) basis. All SNF and radioactive waste data reported are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest DOE/Energy Information Administration (EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are SNF, high-level waste, transuranic waste, low-level waste, uranium mill tailings, DOE Environmental Restoration Program contaminated environmental media, naturally occurring and accelerator-produced radioactive material, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through FY 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions

  13. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  14. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Science.gov (United States)

    Prandi, F.; Magliocchetti, D.; Poveda, A.; De Amicis, R.; Andreolli, M.; Devigili, F.

    2016-06-01

    Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas) project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  15. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Directory of Open Access Journals (Sweden)

    F. Prandi

    2016-06-01

    Full Text Available Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  16. Radioactive waste management: a series of bibliographies. Radioactive waste inventories and projections. Supplement 1

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1986-01-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from October 1982 through December 1984. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. 31 abstracts

  17. India: Project Control. Annex 7

    International Nuclear Information System (INIS)

    Raghavan, V.

    1999-01-01

    This annex deals with project control. India is a country with a long history of nuclear power development, mostly based on indigenous technology and resources. The nuclear power programme has suffered considerable delays due to technical and financial. (author)

  18. Dynamic pricing and inventory control with delivery flexibility

    DEFF Research Database (Denmark)

    Chen, Wen; He, Ying

    2018-01-01

    We study a multi-period inventory system with price-sensitive demand and uncertain supplier, focusing on the advantage of delivery flexibility. The optimal pricing and inventory replenishment decisions are explored. We also investigate the changes of marginal profit, optimal order quantities...

  19. Integrated data base for 1988: Spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1988-09-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1987. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected defense-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis are: spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reportd for miscellaneous, highly radioactive materials that may require geologic disposal. 89 refs., 46 figs., 104 tabs

  20. Integrated Data Base for 1989: Spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1989-11-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1988. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected defense-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, remedial action waste, commercial reactor and fuel cycle facility decommissioning waste, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous, highly radioactive materials that may require geologic disposal. 45 figs., 119 tabs

  1. Integrated data base for 1990: US spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1990-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1989. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 22 refs., 48 figs., 109 tabs

  2. Integrated Data Base for 1991: US spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1991-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1990. These data are based on the most reliable information available form government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated generally through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered are spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 160 refs., 61 figs., 142 tabs

  3. Control your inventory in a world of lean retailing.

    Science.gov (United States)

    Abernathy, F H; Dunlop, J T; Hammond, J H; Weil, D

    2000-01-01

    As retailers adopt lean retailing practices, manufacturers are feeling the pinch. Retailers no longer place large seasonal orders for goods in advance-instead, they require ongoing replenishment of stock, forcing manufacturers to predict demand and then hold substantial inventories indefinitely. Manufacturers now carry the cost of inventory risk--the possibility that demand will dry up and goods will have to be sold below cost. And as product proliferation increases, customer demand becomes harder to predict. Most manufacturers apply one inventory policy for all stock-keeping units in a product line. But the inventory demand for SKUs within the same product line can vary significantly. SKUs with high volume typically have little variation in weekly sales, while slow-selling SKUs can vary enormously in weekly sales. The greater the variation, the larger the inventory the manufacturer must hold relative to an SKU's expected weekly sales. By differentiating inventory policies at the SKU level, manufacturers can reduce inventories for the high-volume SKUs and increase them for the low-volume ones--and thereby improve the profit-ability of the entire line. SKU-level differentiation can also be applied to sourcing strategies. Instead of producing all the SKUs for a product line at a single location, either offshore at low cost or close to market at higher cost, manufacturers can typically do better by going for a mixed allocation. Low-variation goods should be produced mainly offshore, while high-variation goods are best made close to markets.

  4. IMPROVEMENT OF THE METHODS OF INTERNAL CONTROL OF INVENTORIES IN AGRICULTURAL ORGANIZATIONS

    OpenAIRE

    Afanasenko A. N.

    2013-01-01

    The article considers the necessity of inventories for any organization. The fate of the organization depends on its management effectiveness and its financial position. The organizational peculiarities of internal control in the agricultural sphere have been studied and the ways of improvement of the organizational and methodological mechanisms have been offered for the internal control of inventories in agricultural organizations

  5. Integrated data base for 1993: US spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    Klein, J.A.; Storch, S.N.; Ashline, R.C.

    1994-03-01

    The Integrated Data Base (IDB) Program has compiled historic data on inventories and characteristics of both commercial and DOE spent fuel; also, commercial and U.S. government-owned radioactive wastes through December 31, 1992. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest U.S. Department of Energy/Energy Information Administration (DOE/EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste (HLW), transuranic (TRU), waste, low-level waste (LLW), commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) LLW. For most of these categories, current and projected inventories are given through the calendar-year (CY) 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal

  6. Integrated Data Base for 1992: US spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    1992-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1991. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal

  7. Optimal strategy analysis based on robust predictive control for inventory system with random demand

    Science.gov (United States)

    Saputra, Aditya; Widowati, Sutrisno

    2017-12-01

    In this paper, the optimal strategy for a single product single supplier inventory system with random demand is analyzed by using robust predictive control with additive random parameter. We formulate the dynamical system of this system as a linear state space with additive random parameter. To determine and analyze the optimal strategy for the given inventory system, we use robust predictive control approach which gives the optimal strategy i.e. the optimal product volume that should be purchased from the supplier for each time period so that the expected cost is minimal. A numerical simulation is performed with some generated random inventory data. We simulate in MATLAB software where the inventory level must be controlled as close as possible to a set point decided by us. From the results, robust predictive control model provides the optimal strategy i.e. the optimal product volume that should be purchased and the inventory level was followed the given set point.

  8. Inventory Control System for a Healthcare Apparel Service Centre with Stockout Risk: A Case Analysis

    Directory of Open Access Journals (Sweden)

    An Pan

    2017-01-01

    Full Text Available Based on the real-world inventory control problem of a capacitated healthcare apparel service centre in Hong Kong which provides tailor-made apparel-making services for the elderly and disabled people, this paper studies a partial backordered continuous review inventory control problem in which the product demand follows a Poisson process with a constant lead time. The system is controlled by an (Q,r inventory policy which incorporate the stockout risk, storage capacity, and partial backlog. The healthcare apparel service centre, under the capacity constraint, aims to minimize the inventory cost and achieving a low stockout risk. To address this challenge, an optimization problem is constructed. A real case-based data analysis is conducted, and the result shows that the expected total cost on an order cycle is reduced substantially at around 20% with our proposed optimal inventory control policy. An extensive sensitivity analysis is conducted to generate additional insights.

  9. Inventory Control System for a Healthcare Apparel Service Centre with Stockout Risk: A Case Analysis.

    Science.gov (United States)

    Pan, An; Hui, Chi-Leung

    2017-01-01

    Based on the real-world inventory control problem of a capacitated healthcare apparel service centre in Hong Kong which provides tailor-made apparel-making services for the elderly and disabled people, this paper studies a partial backordered continuous review inventory control problem in which the product demand follows a Poisson process with a constant lead time. The system is controlled by an ( Q , r ) inventory policy which incorporate the stockout risk, storage capacity, and partial backlog. The healthcare apparel service centre, under the capacity constraint, aims to minimize the inventory cost and achieving a low stockout risk. To address this challenge, an optimization problem is constructed. A real case-based data analysis is conducted, and the result shows that the expected total cost on an order cycle is reduced substantially at around 20% with our proposed optimal inventory control policy. An extensive sensitivity analysis is conducted to generate additional insights.

  10. Numerical research of the optimal control problem in the semi-Markov inventory model

    Energy Technology Data Exchange (ETDEWEB)

    Gorshenin, Andrey K. [Institute of Informatics Problems, Russian Academy of Sciences, Vavilova str., 44/2, Moscow, Russia MIREA, Faculty of Information Technology (Russian Federation); Belousov, Vasily V. [Institute of Informatics Problems, Russian Academy of Sciences, Vavilova str., 44/2, Moscow (Russian Federation); Shnourkoff, Peter V.; Ivanov, Alexey V. [National research university Higher school of economics, Moscow (Russian Federation)

    2015-03-10

    This paper is devoted to the numerical simulation of stochastic system for inventory management products using controlled semi-Markov process. The results of a special software for the system’s research and finding the optimal control are presented.

  11. Numerical research of the optimal control problem in the semi-Markov inventory model

    International Nuclear Information System (INIS)

    Gorshenin, Andrey K.; Belousov, Vasily V.; Shnourkoff, Peter V.; Ivanov, Alexey V.

    2015-01-01

    This paper is devoted to the numerical simulation of stochastic system for inventory management products using controlled semi-Markov process. The results of a special software for the system’s research and finding the optimal control are presented

  12. Microphonics control for Project X

    International Nuclear Information System (INIS)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.

    2011-01-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High β 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  13. Microphonics control for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.; /Fermilab

    2011-03-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  14. Integrated data base for 1986: spent fuel and radioactive waste inventories, projections, and characteristics. Revision 2

    International Nuclear Information System (INIS)

    1986-09-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US Department of Energy (DOE) radioactive wastes through December 31, 1985, based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. Current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the expected defense-related and private industrial and institutional activities and the latest DOE/Energy Information Administration (EIA) projections of US commercial nuclear power growth. The materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or calculated isotopic compositions

  15. How do glacier inventory data aid global glacier assessments and projections?

    Science.gov (United States)

    Hock, R.

    2017-12-01

    Large-scale glacier modeling relies heavily on datasets that are collected by many individuals across the globe, but managed and maintained in a coordinated fashion by international data centers. The Global Terrestrial Network for Glaciers (GTN-G) provides the framework for coordinating and making available a suite of data sets such as the Randolph Glacier Inventory (RGI), the Glacier Thickness Dataset or the World Glacier Inventory (WGI). These datasets have greatly increased our ability to assess global-scale glacier mass changes. These data have also been vital for projecting the glacier mass changes of all mountain glaciers in the world outside the Greenland and Antarctic ice sheet, a total >200,000 glaciers covering an area of more than 700,000 km2. Using forcing from 8 to 15 GCMs and 4 different emission scenarios, global-scale glacier evolution models project multi-model mean net mass losses of all glaciers between 7 cm and 24 cm sea-level equivalent by the end of the 21st century. Projected mass losses vary greatly depending on the choice of the forcing climate and emission scenario. Insufficiently constrained model parameters likely are an important reason for large differences found among these studies even when forced by the same emission scenario, especially on regional scales.

  16. Combined Log Inventory and Process Simulation Models for the Planning and Control of Sawmill Operations

    Science.gov (United States)

    Guillermo A. Mendoza; Roger J. Meimban; Philip A. Araman; William G. Luppold

    1991-01-01

    A log inventory model and a real-time hardwood process simulation model were developed and combined into an integrated production planning and control system for hardwood sawmills. The log inventory model was designed to monitor and periodically update the status of the logs in the log yard. The process simulation model was designed to estimate various sawmill...

  17. The impact of decentralised control on firm-level inventory: evidence from the automotive industry

    NARCIS (Netherlands)

    de Leeuw, S.L.J.M.; Holweg, M.; Williams, G.

    2011-01-01

    Purpose: The purpose of this paper is to investigate the effect of decentralised control on finished goods inventory levels in a distribution system, and to identify the factors that determine the overall inventory level. Design/methodology/approach: The authors' study is based on a mixed method

  18. Spare parts inventory control under system availability constraints

    NARCIS (Netherlands)

    Houtum, van G.J.J.A.N.; Kranenburg, A.A.

    2015-01-01

    This book focuses on the tactical planning level for spare parts management. It describes a series of multi-item inventory models and presents exact and heuristic optimization methods, including greedy heuristics that work well for real, life-sized problems. The intended audience consists of

  19. Inventory control for point-of-use locations in hospitals

    NARCIS (Netherlands)

    Bijvank, M.; Vis, I. F. A.

    Most inventory management systems at hospital departments are characterised by lost sales, periodic reviews with short lead times, and limited storage capacity. We develop two types of exact models that deal with all these characteristics. In a capacity model, the service level is maximised subject

  20. Inventory control for point-of-use locations in hospitals

    NARCIS (Netherlands)

    M. Bijvank (Marco); I.F.A. Vis (Iris)

    2012-01-01

    textabstractMost inventory management systems at hospital departments are characterised by lost sales, periodic reviews with short lead times, and limited storage capacity. We develop two types of exact models that deal with all these characteristics. In a capacity model, the service level is

  1. Inventory control with product returns : The impact of imperfect information

    NARCIS (Netherlands)

    De Brito, M.P.; Laan, E.A.

    2009-01-01

    Product returns are characterized by considerable uncertainty on time and quantity. In the literature on inventory management for product return environments best forecasts of future returns are associated with methods that use the most information regarding product return history. In practice,

  2. The integrated control of production-inventory systems

    NARCIS (Netherlands)

    Nyen, van P.L.M.

    2005-01-01

    In this thesis, we investigate a multi-product, multi-machine production-inventory (PI) system that is characterized by: ?? relatively high and stable demand; ?? uncertainty in the precise timing of demand; ?? variability in the production process; ?? job shop routings; ?? considerable setup times

  3. Automated Inventory Control System for Nigeria Power Holding

    African Journals Online (AJOL)

    PROF. O. E. OSUAGWU

    2013-09-01

    Sep 1, 2013 ... Power Holding Company of Nigeria (PHCN) currently holds in excess of millions in spare parts inventory ... equipment/utilities at all times in view of stochastic item ... line contingency and small conductor sizing lines which are ...

  4. An Inventory Controlled Supply Chain Model Based on Improved BP Neural Network

    Directory of Open Access Journals (Sweden)

    Wei He

    2013-01-01

    Full Text Available Inventory control is a key factor for reducing supply chain cost and increasing customer satisfaction. However, prediction of inventory level is a challenging task for managers. As one of the widely used techniques for inventory control, standard BP neural network has such problems as low convergence rate and poor prediction accuracy. Aiming at these problems, a new fast convergent BP neural network model for predicting inventory level is developed in this paper. By adding an error offset, this paper deduces the new chain propagation rule and the new weight formula. This paper also applies the improved BP neural network model to predict the inventory level of an automotive parts company. The results show that the improved algorithm not only significantly exceeds the standard algorithm but also outperforms some other improved BP algorithms both on convergence rate and prediction accuracy.

  5. 41 CFR 101-26.606 - Supply support available from the inventory control points of the military departments.

    Science.gov (United States)

    2010-07-01

    ... from the inventory control points of the military departments. 101-26.606 Section 101-26.606 Public... § 101-26.606 Supply support available from the inventory control points of the military departments. Federal civil agencies may obtain items of supply which are procured and managed by the inventory control...

  6. Optimization of Inventory

    OpenAIRE

    PROKOPOVÁ, Nikola

    2017-01-01

    The subject of this thesis is optimization of inventory in selected organization. Inventory optimization is a very important topic in each organization because it reduces storage costs. At the beginning the inventory theory is presented. It shows the meaning and types of inventory, inventory control and also different methods and models of inventory control. Inventory optimization in the enterprise can be reached by using models of inventory control. In the second part the company on which is...

  7. A computer program for controlling a university radioactive material inventory: From confusion to computer to control

    International Nuclear Information System (INIS)

    Robb, D.B.; Riches, C.G.; O'Brian, M.J.; Riordan, F.J.

    1984-01-01

    The University of Washington is a large user of radioactive material. Over 250 authorized programs are working in over 600 labs with nearly 3500 orders of radioactive material per year. The state license sets limits on the total amount of material on campus. There are also limits on sewer disposal. To meet these needs it is necessary to know the amount of material on campus at any time. A computer program was developed which covered many aspects of the radiation safety record needs including inventory control. Inventory is now managed by tracking each order from purchase to disposal. A screen menu as part of the interactive program allows immediate and detailed information about the inventory at time of purchase approval and delivery. Because of this system our knowledge and control of radionuclide work on campus has increased dramatically. A description of how this system is used during ordering, delivery and disposal will be given. Details on the methods to check limits are included along with a summary of the reports made possible by the current data files

  8. Inventory and characteristics of current and projected low-level radioactive materials and waste in the United States

    International Nuclear Information System (INIS)

    Bisaria, A.; Bugos, R.G.; Pope, R.B.; Salmon, R.; Storch, S.N.; Lester, P.B.

    1994-01-01

    The Integrated Data Base (IDB), under US Department of Energy (DOE) funding and guidance, provides an annual update of compiled data on current and projected inventories and characteristics of DOE and commercially owned radioactive wastes. The data base addresses also the inventories of DOE and commercial spent fuel. These data are derived from reliable information from government sources, open literature, technical reports, and direct contacts. The radioactive materials considered are spent nuclear fuel, high-level waste (HLW), transuranic (TRU) waste, low-level waste (LLW), commercial uranium mill tailings, environmental restoration wastes, and mixed-LLW. This paper primarily focuses on LLW inventory and characterization

  9. EPA's Review of DOE's Inventory Tracking for TRU Wastes at Waste Control Specialists

    Science.gov (United States)

    On April 9, 2014, EPA's Waste Isolation Pilot Plant (WIPP) waste characterization team visited Waste Control Specialists (WCS) to determine whether DOE was meeting EPA's waste inventory tracking requirements at 40 CFR 194.24(c)(4).

  10. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  11. Chemical inventory control program for mixed and hazardous waste facilities at SRS

    International Nuclear Information System (INIS)

    Ades, M.J.; Vincent, A.M. III.

    1997-01-01

    Mixed Waste (MW) and Hazardous Waste (HW) are being stored at the Savannah River Site (SRS) pending onsite and/or offsite treatment and disposal. The inventory control for these wastes has recently been brought under Technical Safety Requirements (TSR) in accordance with DOE Order 5480.22. With the TSRs was the question of the degree of rigor with which the inventory is to be tracked, considering that the variety of chemicals present, or that could be present, numbers in the hundreds. This paper describes the graded approach program to track Solid Waste (SW) inventories relative to TSRs. The approach uses a ratio of the maximum anticipated chemical inventory to the permissible inventory in accordance with Emergency Response Planning Guideline (ERPG) limits for on- and off-site receptors. A specific threshold ratio can then be determined. The chemicals above this threshold ratio are to be included in the chemical inventory control program. The chemicals that fall below the threshold ratio are managed in accordance with existing practice per State and RCRA hazardous materials requirements. Additionally, the facilities are managed in accordance with process safety management principles, specifically using process hazards analyses, which provides safety assurance for even the small quantities that may be excluded from the formal inventory control program. The method yields a practical approach to chemical inventory control, while maintaining appropriate chemical safety margins. The resulting number of specific chemicals that require inclusion in a rigorous inventory control program is greatly reduced by about 80%, thereby resulting in significant reduction in chemical data management while preserving appropriate safety margins

  12. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  13. Spent Nuclear Fuel project interface control plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces

  14. An expert system for spare parts inventory control

    International Nuclear Information System (INIS)

    Kim, K.Y.; Chen, P.Y.C.; Okrent, D.

    1987-01-01

    This paper describes an expert system which can handle spare part requirements not only in corrective maintenance (CM) or preventive maintenance (PM), but also when failure rates of components or parts are updated by new data or by predictive maintenance (PDM), and which can also decide optimum stocking level of each spare part. This expert system provides a maintenance (or inventory) manager with an improved basis for decision making in the maintenance related to spare parts. The definitions of PM and PDM from NUREG-1212 (USNRC 1986) are used herein. This expert system used Intellignece/Compiler (Intelligence Ware, 1986) as a language/tool in the IBM-PC

  15. Implementing structure and control over unofficial inventories in a multispecialty group practice.

    Science.gov (United States)

    Gall, M

    1994-02-01

    Materiel managers have been in control of most aspects of the supply chain except for the inventories of the end users, which account for 70 percent of the inventory supply dollars. When the Materials Manager at Lexington Clinic in Lexington, Kentucky, was approached by the Clinic's Chief Executive Officer to implement cost containment measures, the Materials Manager seized the opportunity to implement a six-step program aimed at controlling those supply dollars. Through requisition training, enforcing approval levels, limiting the number of requisitioners, and establishing par levels on floor inventories, the clinic's "unofficial" inventory supply dollars were reduced by 7 percent in the first 12 departments where the par levels were established. The program was hailed as a tremendous success and a positive experience for everyone, from nurses to warehouse clerks.

  16. Steam Generator control in Nuclear Power Plants by water mass inventory

    Energy Technology Data Exchange (ETDEWEB)

    Dong Wei [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States); Doster, J. Michael [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States)], E-mail: doster@eos.ncsu.edu; Mayo, Charles W. [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States)

    2008-04-15

    Control of water mass inventory in Nuclear Steam Generators is important to insure sufficient cooling of the nuclear reactor. Since downcomer water level is measurable, and a reasonable indication of water mass inventory near steady-state, conventional feedwater control system designs attempt to maintain downcomer water level within a relatively narrow operational band. However, downcomer water level can temporarily react in a reverse manner to water mass inventory changes, commonly known as shrink and swell effects. These complications are accentuated during start-up or low power conditions. As a result, automatic or manual control of water level is difficult and can lead to high reactor trip rates. This paper introduces a new feedwater control strategy for Nuclear Steam Generators. The new method directly controls water mass inventory instead of downcomer water level, eliminating complications from shrink and swell all together. However, water mass inventory is not measurable, requiring an online estimator to provide a mass inventory signal based on measurable plant parameters. Since the thermal-hydraulic response of a Steam Generator is highly nonlinear, a linear state-observer is not feasible. In addition, difficulties in obtaining flow regime and density information within the Steam Generator make an estimator based on analytical methods impractical at this time. This work employs a water mass estimator based on feedforward neural networks. By properly choosing and training the neural network, mass signals can be obtained which are suitable for stable, closed-loop water mass inventory control. Theoretical analysis and simulation results show that water mass control can significantly improve the operation and safety of Nuclear Steam Generators.

  17. Steam Generator control in Nuclear Power Plants by water mass inventory

    International Nuclear Information System (INIS)

    Dong Wei; Doster, J. Michael; Mayo, Charles W.

    2008-01-01

    Control of water mass inventory in Nuclear Steam Generators is important to insure sufficient cooling of the nuclear reactor. Since downcomer water level is measurable, and a reasonable indication of water mass inventory near steady-state, conventional feedwater control system designs attempt to maintain downcomer water level within a relatively narrow operational band. However, downcomer water level can temporarily react in a reverse manner to water mass inventory changes, commonly known as shrink and swell effects. These complications are accentuated during start-up or low power conditions. As a result, automatic or manual control of water level is difficult and can lead to high reactor trip rates. This paper introduces a new feedwater control strategy for Nuclear Steam Generators. The new method directly controls water mass inventory instead of downcomer water level, eliminating complications from shrink and swell all together. However, water mass inventory is not measurable, requiring an online estimator to provide a mass inventory signal based on measurable plant parameters. Since the thermal-hydraulic response of a Steam Generator is highly nonlinear, a linear state-observer is not feasible. In addition, difficulties in obtaining flow regime and density information within the Steam Generator make an estimator based on analytical methods impractical at this time. This work employs a water mass estimator based on feedforward neural networks. By properly choosing and training the neural network, mass signals can be obtained which are suitable for stable, closed-loop water mass inventory control. Theoretical analysis and simulation results show that water mass control can significantly improve the operation and safety of Nuclear Steam Generators

  18. Information system design of inventory control spare parts maintenance (valuation class 5000) (case study: plant kw)

    Science.gov (United States)

    Fitriana, Rina; Moengin, Parwadi; Riana, Mega

    2016-02-01

    Plat KW hadn't using optimal inventory level planning yet and hadn't have an information system that well computerized. The research objective is to be able to design an information system related inventory control of spare parts maintenance. The study focused on five types of spare parts with the highest application rate during February 2013- March 2015 and included in the classification of fast on FSN analysis Grinding stones Cut 4". Cable Tie 15". Welding RB 26-32MM. Ring Plat ½" and Ring Plate 5/8 ". Inventory calculation used Economic Order Quantity (EOQ). Safety Stock (SS) and Reorder Point (ROP) methods. System analysis conducted using the framework PIECES with the proposed inventory control system. the performance of the plant KW relating to the supply of spare parts maintenance needs can be more efficient as well as problems at the company can be answered and can perform inventory cost savings amounting Rp.267.066. A computerized information system of inventory control spare parts maintenance provides a menu that can be accessed by each departments as the user needed.

  19. The Joint COntrols Project Framework

    CERN Document Server

    González-Berges, M

    2003-01-01

    The Framework is one of the subprojects of the Joint COntrols Project (JCOP), which is collaboration between the four LHC experiments and CERN. By sharing development, this will reduce the overall effort required to build and maintain the experiment control systems. As such, the main aim of the Framework is to deliver a common set of software components, tools and guidelines that can be used by the four LHC experiments to build their control systems. Although commercial components are used wherever possible, further added value is obtained by customisation for HEP-specific applications. The supervisory layer of the Framework is based on the SCADA tool PVSS, which was selected after a detailed evaluation. This is integrated with the front-end layer via both OPC (OLE for Process Control), an industrial standard, and the CERN-developed DIM (Distributed Information Management System) protocol. Several components are already in production and being used by running fixed-target experiments at CERN as well as for th...

  20. The KINDRA H2020 Project: a knowledge inventory for hydrogeology research

    Science.gov (United States)

    Petitta, Marco; Bodo, Balazs; Caschetto, Mariachiara; Correia, Victor; Cseko, Adrienn; Fernandez, Isabel; Hartai, Eva; Hinsby, Klaus; Madarasz, Tamas; Garcia Padilla, Mercedes; Szucs, Peter

    2015-04-01

    into wider programs generally related to water, environment or ecology. In order to have a comprehensive understanding on the groundwater theme, it is necessary to create a "snapshot" of our scientific knowledge as of 2015/2016 covering as many European countries as possible. Such comprehensive coverage will result in an accurate assessment of the state of the art in hydrogeology research in various geographical and geo-environmental settings, allowing for direct comparison and the exploitation of synergies. The KINDRA project (Knowledge Inventory for hydrogeology research, Grant Agreement No. 642047, www.kindraproject.eu) seeks to create a critical mass for scientific knowledge exchange of hydrogeology research, to ensure wide applicability of research results, including support of innovation and development, and to reduce unnecessary duplication of efforts. KINDRA is funded by the European Commission's HORIZON2020 Framework Programme. The project started on 1 January 2015 with the overall objective to take stock of our contemporary knowledge of hydrogeology with the help of an inventory of research results, activities, projects and programmes, and then use the inventory to identify critical research challenges and gaps, with a view to avoiding overlaps. This approach takes into account the implementation of the WFD and new innovation areas within integrated water resources management, allowing at EU scale the future correct management and policy development of groundwater.

  1. Multi-leg Seat Inventory Control Based on EMSU and Virtual Bucket

    Directory of Open Access Journals (Sweden)

    Wei Fan

    2014-01-01

    Full Text Available Expected marginal seat revenue (EMSR is a well-known method for airline seat inventory control airlines. However, this method employs a static model to study the dynamic reservation process, and does not take into account the risk tolerance of policy makers. Expected marginal seat utility (EMSU replaces revenue by utility, which addresses the real situation of seat inventory control. However, there is still a lack of multi-leg seat control algorithms based on EMSU. Therefore, using EMSU and bucket algorithms, this paper applies the Markov decision-making process to simulate the flight reservation process and builds a dynamic multi-leg seat inventory control model. Experimental results validate the effectiveness of the proposed method.

  2. A project on groundwater research inventory and classification to make groundwater visible

    Science.gov (United States)

    Cseko, Adrienn; Petitta, Marco; van der Keur, Peter; Fernandez, Isabel; Garcia Alibrandi, Clint; Hinsby, Klaus; Hartai, Eva; Garcia Padilla, Mercedes; Szucs, Peter; Mikita, Viktoria; Bisevac, Vanja; Bodo, Balazs

    2017-04-01

    Hydrogeology related research activities cover a wide spectrum of research areas at EU and national levels. The European knowledge base on this important topic is widespread and fragmented into broader programs generally related to waterresources, environment or ecology. In order to achieve a comprehensive understanding on the groundwater theme, the KINDRA project (Knowledge Inventory for Hydrogeology Research - www.kindraproject.eu) seeks to carry out an accurate assessment of the state of the art in hydrogeology research and to create a critical mass for scientific knowledge exchange of hydrogeology research, to ensure wide accessibility and applicability of research results, including support of innovation and development, and to reduce unnecessary duplication of efforts. The first two years of the project have focused its efforts in developing the concept of a Harmonized Terminology and Methodology for Classification and Reporting Hydrogeology related Research in Europe (HRCSYS) as well as its implementation in the European Inventory of Groundwater Research (EIGR). For developing the common terminology, keywords characterizing research on groundwater have been identified from two main sources: the most important EU directives and policy documents and from groundwater related scientific literature. To assess the importance and pertinence of the keywords, these have been ranked by performing searches via the Web of Science, Scopus and Google Scholar search engines. The complete merged list of keywords consisting of more than 200 terms has been organized in a tree hierarchy, identifying three main categories: Societal Challenges (SC), Operational Actions (OA) and Research Topics (RT). The relationships among these main categories expressed by a 3D approach, identifying single intersections among 5 main overarching groups for each category. The EIGR itself contains metadata (about 1800 records at the moment) of research efforts and topic related knowledge

  3. Administrative Lead Time at Navy Inventory Control Points

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... We also evaluated the internal controls established for administrative lead time and the adequacy of management's implementation of the DoD Internal Management Control Program for monitoring administrative lead time...

  4. Emissions inventories and options for control SUMMARY REPORT

    OpenAIRE

    Swart RJ; van Amstel AR; van den Born GJ; Kroeze C; MTV; LAE

    1994-01-01

    Dit is het eindrapport van het project "Maatschappelijke oorzaken broeikaseffect: emissie-inventarisaties en opties voor uitworpbeperking", gefinancierd door het Nationaal Onderzoek Programma Mondiale Luchtverontreiniging en Klimaatverandering en het Directoraat Milieuhygiene van het Ministerie van Volkshuisvesting, Ruimtelijke Ordening en Milieubeheer. In 1990 was er weinig bekend over de nationale uitworp van de niet-CO2 broeikasgassen en de oorzaken ervan. De doelstellingen van h...

  5. Model Development for Auto Spare Parts Inventory Control and ...

    African Journals Online (AJOL)

    2012-12-01

    Dec 1, 2012 ... essential motivating factors for providing control in manufacturing companies has never showed any sign ... The management of these parts can only be done with the aid of a computer; ... perform a discrete event simulation of.

  6. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  7. Inventory control in multi-item production systems

    NARCIS (Netherlands)

    Bruin, J.

    2010-01-01

    This thesis focusses on the analysis and construction of control policies in multiitem production systems. In such systems, multiple items can be made to stock, but they have to share the finite capacity of a single machine. This machine can only produce one unit at a time and if it is set-up for

  8. ORIGEN-based Nuclear Fuel Inventory Module for Fuel Cycle Assessment: Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Skutnik, Steven E. [Univ. of Tennessee, Knoxville, TN (United States). Dept. of Nuclear Engineering

    2017-06-19

    The goal of this project, “ORIGEN-based Nuclear Fuel Depletion Module for Fuel Cycle Assessment" is to create a physics-based reactor depletion and decay module for the Cyclus nuclear fuel cycle simulator in order to assess nuclear fuel inventories over a broad space of reactor operating conditions. The overall goal of this approach is to facilitate evaluations of nuclear fuel inventories for a broad space of scenarios, including extended used nuclear fuel storage and cascading impacts on fuel cycle options such as actinide recovery in used nuclear fuel, particularly for multiple recycle scenarios. The advantages of a physics-based approach (compared to a recipe-based approach which has been typically employed for fuel cycle simulators) is in its inherent flexibility; such an approach can more readily accommodate the broad space of potential isotopic vectors that may be encountered under advanced fuel cycle options. In order to develop this flexible reactor analysis capability, we are leveraging the Origen nuclear fuel depletion and decay module from SCALE to produce a standalone “depletion engine” which will serve as the kernel of a Cyclus-based reactor analysis module. The ORIGEN depletion module is a rigorously benchmarked and extensively validated tool for nuclear fuel analysis and thus its incorporation into the Cyclus framework can bring these capabilities to bear on the problem of evaluating long-term impacts of fuel cycle option choices on relevant metrics of interest, including materials inventories and availability (for multiple recycle scenarios), long-term waste management and repository impacts, etc. Developing this Origen-based analysis capability for Cyclus requires the refinement of the Origen analysis sequence to the point where it can reasonably be compiled as a standalone sequence outside of SCALE; i.e., wherein all of the computational aspects of Origen (including reactor cross-section library processing and interpolation, input and output

  9. Inventory control for a perishable product with non-stationary demand

    NARCIS (Netherlands)

    Pauls-Worm, K.G.J.

    2016-01-01

    Globally, around one-third of the edible parts of perishable food products is wasted every year. Adequate logistics management of the food supply chain is of importance. Inventory control of processed fresh food with a best-before or use-by date deals with the questions how much to order and how

  10. Inventory control in multi-echelon divergent systems with random lead times

    NARCIS (Netherlands)

    Heijden, van der M.C.; Diks, E.B.; Kok, de A.G.

    1996-01-01

    This paper deals with integral inventory control in multi-echelon divergent systems with stochastic lead times. The policy considered is an echelon stock, periodic review, order-up-to (R, S) policy. A computational method is derived to obtain the order-up-to level and the allocation fractions

  11. The Attitudes & Beliefs on Classroom Control Inventory-Revised and Revisited: A Continuation of Construct Validation

    Science.gov (United States)

    Martin, Nancy K.; Yin, Zenong; Mayall, Hayley

    2008-01-01

    The purpose of this study was to report the psychometric properties of the revised Attitudes and Beliefs of Classroom Control Inventory (ABCC-R). Data were collected from 489 participants via the ABCC-R, Teacher Efficacy Scale, Problems in School Questionnaire, and a demographic questionnaire. Results were in keeping with the construct. The…

  12. Mixed Waste Management Facility (MWMF) Old Burial Ground (OBG) source control technology and inventory study

    Energy Technology Data Exchange (ETDEWEB)

    Flach, G.P.; Rehder, T.E.; Kanzleiter, J.P.

    1996-10-02

    This report has been developed to support information needs for wastes buried in the Burial Ground Complex. Information discussed is presented in a total of four individual attachments. The general focus of this report is to collect information on estimated source inventories, leaching studies, source control technologies, and to provide information on modeling parameters and associated data deficiencies.

  13. Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand

    NARCIS (Netherlands)

    Moors, J.J.A.; Strijbosch, L.W.G.

    2001-01-01

    For the familiar (R; s; S) inventory control system only approximate expressions exist for the fill rate, i.e. the fraction of demand that can be satisfied from stock.Best-known are the approximations derived from renewal theory by Tijms & Groenevelt (1984), holding under specific conditions; in

  14. Mixed Waste Management Facility (MWMF) Old Burial Ground (OBG) source control technology and inventory study

    International Nuclear Information System (INIS)

    Flach, G.P.; Rehder, T.E.; Kanzleiter, J.P.

    1996-01-01

    This report has been developed to support information needs for wastes buried in the Burial Ground Complex. Information discussed is presented in a total of four individual attachments. The general focus of this report is to collect information on estimated source inventories, leaching studies, source control technologies, and to provide information on modeling parameters and associated data deficiencies

  15. Inventory control in multi-echelon divergent systems with random lead times

    NARCIS (Netherlands)

    van der Heijden, Matthijs C.; Diks, Erik; de Kok, Ton

    1999-01-01

    This paper deals with integral inventory control in multi-echelon divergent systems with stochastic lead times. The policy considered is an echelon stock, periodic review, order-up-to (R, S) policy. A computational method is derived to obtain the order-up-to level and the allocation fractions

  16. Detailed CATHENA Model of the Wolsong 1 Pressure and Inventory Control System

    Energy Technology Data Exchange (ETDEWEB)

    Cha, K.H. [Korea Electric Power Research Institute, Taejon (Korea)

    2002-07-01

    The Detailed CATHENA model of Wolsong 1 is development to be able to simulate a theramal hydraulic behavior of heat transport system(HTS) Pressure and Inventory Control System(PNIC) at any power operation condition and during transient events such as mall LOCA(small loss of coolant inventory and small breaks in the primary system piping) and non-LOCA(loss of reactivity regulation, loss of flow, loss if Class IV power, loss of PNIC). (author). 12 refs., 7 figs., 6 tabs.

  17. Safety analysis and inventory control of transuranic and low-level waste in common storage

    International Nuclear Information System (INIS)

    Porten, D.R.; Bonner, A.L.; Joyce, J.P.

    1993-01-01

    This paper describes a methodology developed For the inventory control of low-level waste (LLW) and transuranic (TRU) waste, when both are stored in the same location, and both contribute to an inventory constrained by safety considerations. Development of the method arose from the necessity to make safety analysis calculations for the addition of LLW, in quantities greater than existing inventory limits would allow when stored with TRU waste, in the Hanford Central Waste Complex (CWC)-Ensuring that the dose consequences of credible releases are maintained at low-hazard limits or less, was used to allow greater than Type A quantities of LLW into the CWC. Basically, what happens is the original limited amount of TRU allowed is reduced by some equivalent amount of LLW introduced. The total quantity of TRU, and LLW in excess of Type A quantities, must be administratively maintained via curie equivalency Factors to ensure operation as a low-hazard Facility. The ''equivalency'' between TRU and LLW proposed here is specific only to the CWC, but the methodology can be used for other specific applications, such as TRU and LLW storage or handling facilities where inventory limits must be enforced or where a simplified inventory system is required

  18. Dynamic Pricing and Production Control of an Inventory System with Remanufacturing

    Directory of Open Access Journals (Sweden)

    Chunyan Gao

    2015-01-01

    Full Text Available We consider optimal pricing and manufacturing control of a continuous-review inventory system with remanufacturing. Customer demand and product return follow independent Poisson processes. Customer demand is filled by serviceable product, which can be either manufactured or remanufactured from the returned product. The lead times for both manufacturing and remanufacturing are exponentially distributed. The objective is to maximize the expected total discounted profit over an infinite planning horizon. We characterize the structural properties of the optimal policy through the optimality equation. Specifically, the optimal manufacturing policy is a base-stock policy with the base-stock level nonincreasing in the return inventory level. The optimal pricing policy is also a threshold policy, where the threshold level is nonincreasing in the return inventory level.

  19. Inventory control through gamma spectrometry at the enriched uranium laboratory

    International Nuclear Information System (INIS)

    Vicens, H.E.; Korob, R.O.; Goldschmidt, A.E.

    1987-01-01

    The enriched uranium laboratory processes alternatively uranium 90% and 20% enriched in U-235. The control of the isotopic composition of lots is made through mass spectrometry. In the laboratory operation wastes of both enrichments are generated and the recovery is performed with a time delay. To strengthen the administrative controls, avoid errors related to personnel replacement and/or deferred operations, it seemed suitable to adjust the gamma spectrometry as a fast, simple and available method to determine the enrichment. The laboratory work includes a wet and a dry process. The waste recovery necessarily involves the handling of liquid samples. For this reason, it was decided to determine the calibration curve for uranyl nitrate samples of fixed concentration and geometry. The samples were prepared from material purified through double precipitation of uranium peroxide and subsequent ignition to U 3 O 8 in platinum crucible, in tubular oven during 8 hours at 720 deg C. The preparation of samples, the measurement description, the discussion of results and the analysis of errors due to the presence of insoluble material and concentration changes are included. (Author)

  20. Intelligent Approach to Inventory Control in Logistics under Uncertainty Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Więcek, P.

    2016-07-01

    The article presents a proposal for a combined application of fuzzy logic and genetic algorithms to control the procurement process in the enterprise. The approach presented in this paper draws particular attention to the impact of external random factors in the form of demand and lead time uncertainty. The model uses time-variable membership function parameters in a dynamic fashion to describe the modelled output fuzzy (sets) values. An additional element is the use of genetic algorithms for optimisation of fuzzy rule base in the proposed method. The approach presented in this paper was veryfied according to four criteria based on a computer simulation performed on the basis of the actual data from an enterprise. (Author)

  1. 32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Inventory and review schedule (Report Control... OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory and review schedule (Report Control Symbol DD-P&L(A)). (a) Information in each DoD Component's...

  2. Canada: Darlington NPP. Project Control. Annex 4

    International Nuclear Information System (INIS)

    Wieckowski, G.

    1999-01-01

    This annex deals with project control. The just slowed down and delayed. Senior engineering, construction and procurement staff stayed with the project. Documentation was preserved though normal functioning of the records department project was completed and put into service with a few years' delay. (author)

  3. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  4. Control system implementation for a complex low inventory cryogenic distillation system for Princeton TFTR

    International Nuclear Information System (INIS)

    Busigin, A.; Busigin, C.J.; Adamek, F.; Woodall, K.B.; Robins, J.R.; Bellamy, D.G.; Fong, C.; Kalyanam, K.M.; Sood, S.K.

    1995-01-01

    The TFTR Tritium Purification System (TPS) is based on a Pd/Ag diffuser front-end for separating hydrogen isotopes from inert gas, and a four column cryogenic distillation cascade for separation of hydrogen isotopes. The system has a tritium inventory of approximately 0.5 g while successfully producing pure H 2 , D 2 and T 2 products. The system has recently been built and successfully commissioned with protium and deuterium. Stable automatic control of the cascade has been demonstrated even when feed rate and composition varied. The automatic control scheme maintained stable column inventories and excellent H 2 and D 2 product qualities. The control system employed new control concepts such as real time analysis of mid-column composition using temperature and pressure data for feedback control. Very stable column inventory control was achieved by automatic adjustment of inter-column flows (feed forward and feed back). This paper discusses the control system design and presents performance test results. (orig.)

  5. Projected radionuclide inventories of DWPF glass from current waste at time of production

    International Nuclear Information System (INIS)

    Plodinec, M.J.

    1993-01-01

    The Waste Acceptance Preliminary Specifications (WAPS) require that the DWPF estimate the inventory of long-lived radionuclides present in the waste glass, and report the values in the Waste Form Qualification Report. In this report, conservative (biased high) estimates of the radionuclide inventory of glass produced from waste currently in the Tank Farm are provided. In most cases, these calculated values compare favorably with actual data. In those cases where the agreement is not good, the values reported here are conservative

  6. Improvement of inventory control and forecast according to activity-based classifications: T company as an example

    Science.gov (United States)

    Huang, Jui-Chan; Wu, Tzu-Jung; Chiu, Yen-Chun; Lu, Chunwei

    2017-06-01

    Inventory management is a major issue for all the industries. The supply of products to customers requires the readiness of the inventory. This allows rapid delivery and reduces waiting time for customers so that companies can profit from it. Any stock out or insufficiency will lead to loss of customers because their needs cannot be met. This will hurt firm profitability and market competitiveness. Inventory control is critical to retain liquidity and avoid overstocking. This is also the key to firm's survival and sustainability. To ensure an appropriate level of inventory, it is necessary to manage the inventory levels with sales forecast on an on-going basis. This paper seeks to assist Company T to improve its inventory control. Firstly, the products offered by Company T are classified into groups. The R programming language is used to stimulate and forecast future sales of different products. Different techniques are applied to manage the inventory levels according to the results of categorizations and forecasts that are consolidation of all the product items and grouping them into activity-based classifications, simulation and forecasting of future sales according to the categorization results, and formulation of different control techniques based on the simulations and forecasts. The results and the inventory management can be used to enhance the inventory control as well.

  7. Forest inventory in Myanmar

    Energy Technology Data Exchange (ETDEWEB)

    Bo, Sit [Forest Resource Div., Forest Department (Myanmar)

    1993-10-01

    Forest inventory in Myanmar started in 1850s. Up till 1975, Myanmar Forest Department conducted forest inventories covering approximately one forest division every year. The National Forest Survey and Inventory Project funded by UNDP and assisted by FAO commenced in 1981 and the National Forest Management and Inventory project followed in 1986. Up till end March 1993, pre-investment inventory has covered 26.7 million acres, reconnaissance inventory 5.4 million acres and management inventory has carried out in 12 townships

  8. Forest inventory in Myanmar

    International Nuclear Information System (INIS)

    Sit Bo

    1993-01-01

    Forest inventory in Myanmar started in 1850s. Up till 1975, Myanmar Forest Department conducted forest inventories covering approximately one forest division every year. The National Forest Survey and Inventory Project funded by UNDP and assisted by FAO commenced in 1981 and the National Forest Management and Inventory project followed in 1986. Up till end March 1993, pre-investment inventory has covered 26.7 million acres, reconnaissance inventory 5.4 million acres and management inventory has carried out in 12 townships

  9. Project control of WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Buende, R.; Gottschewsky, M.; Heinrich, S.

    2001-01-01

    WENDELSTEIN 7-X (W7-X) is an experimental stellarator presently under construction at the new branch of IPP Garching at Greifswald. Since its beginning in 1996, the project W7-X Construction has been incorporating a comprehensive project control activity to assure the plant is constructed according to schedule and budget. The working fields of the project control--organization, planning and controlling--are described together with the relevant boundary conditions of the project. The activities in these fields are highlighted and an overview of the status of the project is given with emphasis on the components on the time-critical path. As conclusions some important issues for the future of the project are specified

  10. INTERNAL CONTROL OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Yu. N. Yudenkov

    2010-01-01

    Full Text Available Estimation and technics of the account of expenses, efficiency, financial result should enter into the list of regular checks from service of internal control that demands corresponding vocational training of internal controlers which should own methods of an estimation of expediency of acquisition of long-term actives.

  11. Integrated data base for 1993: US spent fuel and radioactive waste inventories, projections, and characteristics. Revision 9

    Energy Technology Data Exchange (ETDEWEB)

    Klein, J.A.; Storch, S.N.; Ashline, R.C. [and others

    1994-03-01

    The Integrated Data Base (IDB) Program has compiled historic data on inventories and characteristics of both commercial and DOE spent fuel; also, commercial and U.S. government-owned radioactive wastes through December 31, 1992. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest U.S. Department of Energy/Energy Information Administration (DOE/EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste (HLW), transuranic (TRU), waste, low-level waste (LLW), commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) LLW. For most of these categories, current and projected inventories are given through the calendar-year (CY) 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal.

  12. Integrated Data Base report--1993: U.S. spent nuclear fuel and radioactive waste inventories, projections, and characteristics. Revision 10

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and DOE spent nuclear fuel; also, commercial and US government-owned radioactive wastes through December 31, 1993. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 256 refs., 38 figs., 141 tabs.

  13. Integrated Data Base report--1993: U.S. spent nuclear fuel and radioactive waste inventories, projections, and characteristics. Revision 10

    International Nuclear Information System (INIS)

    1994-12-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and DOE spent nuclear fuel; also, commercial and US government-owned radioactive wastes through December 31, 1993. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 256 refs., 38 figs., 141 tabs

  14. Aircraft Emission Inventories Projected in Year 2015 for a High Speed Civil Transport (HSCT) Universal Airline Network. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S.L.; Henderson, S.C.

    1995-07-01

    This report describes the development of a three-dimensional database of aircraft fuel burn and emissions (fuel burned, NOx, CO, and hydrocarbons) from projected fleets of high speed civil transports (HSCT`s) on a universal airline network. Inventories for 500 and 1000 HSCT fleets, as well as the concurrent subsonic fleets, were calculated. The objective of this work was to evaluate the changes in geographical distribution of the HSCT emissions as the fleet size grew from 500 to 1000 HSCT`s. For this work, a new expanded HSCT network was used and flights projected using a market penetration analysis rather than assuming equal penetration as was done in the earlier studies. Emission inventories on this network were calculated for both Mach 2.0 and Mach 2.4 HSCT fleets with NOx cruise emission indices of approximately 5 and 15 grams NOx/kg fuel. These emissions inventories are available for use by atmospheric scientists conducting the Atmospheric Effects of Stratospheric Aircraft (AESA) modeling studies. Fuel burned and emissions of nitrogen oxides (NOx as NO2), carbon monoxide, and hydrocarbons have been calculated on a 1 degree latitude x 1 degree longitude x 1 kilometer attitude grid and delivered to NASA as electronic files.

  15. Integrated Data Base for 1992: US spent fuel and radioactive waste inventories, projections, and characteristics. Revision 8

    Energy Technology Data Exchange (ETDEWEB)

    Payton, M. L.; Williams, J. T.; Tolbert-Smith, M.; Klein, J. A.

    1992-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1991. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal.

  16. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  17. Research on Multi-leg Inventory Control Based on Passenger Choice

    OpenAIRE

    Fan, Wei; Su, Qiubo; Ip, Wai Hung

    2014-01-01

    To remedy the lack of mathematical programming and the Expected Marginal Seat Revenue (EMSR) model for multi-leg seat inventory control, this paper proposes a method based on passenger choice. Except for data about which seats passengers decide to opt for, there is no need to obtain distributions of passengers’ demands or other “a priori” information. The proposed method can discover the real factors that affect passengers’ choices, and then estimate the probabilities of seat choices and the ...

  18. LQ Optimal Sliding Mode Control of Periodic Review Perishable Inventories with Transportation Losses

    OpenAIRE

    Leśniewski, Piotr; Bartoszewicz, Andrzej

    2013-01-01

    In this work we apply the control-theoretic approach to design a new replenishment strategy for inventory systems with perishable stock. Such systems are supposed to effectively satisfy an unknown and permanently time-varying consumers’ demand. The main obstacle of achieving this goal is the need of obtaining supplies from a distant source. During the supply process goods are inevitably lost due to various causes. Furthermore, those goods which successfully arrive at the distribution center s...

  19. Process control and safeguards system plutonium inventory conrol for MOX fuel facility

    International Nuclear Information System (INIS)

    Mishima, T.; Aoki, M.; Muto, T.; Amanuma, T.

    1979-01-01

    The plutonium inventory control (PINC) system is a real-time material accountability control system that is expected to be applied to a new large-scale plutonium fuel production facility for both fast breeder reactor and heavy water reactor at the Power Reactor and Nuclear Development Corporation. The PINC is basically a system for material control but is expected to develop into a whole facility control system, including criticality control, process control, quality control, facility protection, and so forth. Under PINC, every process and storage area is divided into a unit area, which is the smallest unit for both accountability and process control. Item and material weight automatically are accounted for at every unit area, and data are simultaneously treated by a computer network system. Sensors necessary for the system are being developed. 9 figures

  20. Project Re-ed: increase in self-esteem as measured by the Coopersmith Inventory.

    Science.gov (United States)

    Friedman, S; Rogers, P P; Gettys, J

    1975-02-01

    A group of boys and girls (9 to 15 yr. of age) who were identified as emotionally disturbed and in residential enrollment at a short-term (2 to 15 mo.) high-impact residential treatment center displayed a significant gain on the Coopersmith Self-esteem Inventory. Of the 59 children 37 showed a gain; 19 showed a decrease.

  1. Italian National Forest Inventory: methods, state of the project, and future developments

    Science.gov (United States)

    Giovanni Tabacchi; Flora De Natale; Antonio Floris; Caterina Gagliano; Patrizia Gasparini; Gianfranco Scrinzi; Vittorio Tosi

    2007-01-01

    A primary objective of the Italian National Forest Inventory (NFI) is to provide information required by the Kyoto Protocol and the Ministerial Conference on the Protection of Forests in Europe in relation to sustainable forest management practices. For this reason, the second Italian NFI was aimed at providing data in a way that is consistent with the international...

  2. Changing an automated drug inventory control system to a data base design.

    Science.gov (United States)

    Bradish, R A

    1982-09-01

    A pharmacy department's change from indexed sequential access files to a data base management system (DBMS) for purposes of automated inventory control is described. The DBMS has three main functional areas: (1) inventory ordering and accountability, (2) charging of interdepartmental and intradepartmental orders, and (3) data manipulation with report design for management control. There are seven files directly related to the inventory ordering and accountability area. Each record can be accessed directly or through another file. Information on the quantity of a drug on hand, drug(s) supplied by a specific vendor, status of a purchase order, or calculation of an estimated order quantity can be retrieved quickly. In the drug master file, two records contain a reorder point and safety-stock level that are determined by searching the entries in the order history file and vendor master file. The intradepartmental and interdepartmental orders section contains five files assigned to record and store information on drug distribution. All items removed from the stockroom and distributed are recorded, and reports can be generated for itemized bills, total cost by area, and as formatted files for the accounts payable department. The design, development, and implementation of the DBMS took approximately a year using a part-time pharmacist and minimal outside help, while the previous system required constant expensive help of a programmer/analyst. The DBMS has given the pharmacy department a flexible inventory management system with increased drug control, decreased operating expenses, increased use of department personnel, and the ability to develop and enhance other systems.

  3. Bulgaria: Belene NPP. Project Control. Annex 3

    International Nuclear Information System (INIS)

    Nabatov, N.

    1999-01-01

    This annex deals with project control. The Belene project has been suspended for 7 years after approx. 50% of money had been spent. Equipment, structures and documentation have been well protected, but majority of qualified personnel have been lost. Resumption of work awaits government decision and provision of funds. (author)

  4. Genetic algorithm to optimize two-echelon inventory control system for perishable goods in terms of active packaging

    Directory of Open Access Journals (Sweden)

    Babak Yousefi Yegane

    2012-01-01

    Full Text Available This paper considers an inventory control policy for a two-echelon inventory control system with one supplier-one buyer. We consider the case of deteriorating items which lead to shortage in supply chain. Therefore, it is necessary to decrease the deterioration rate by adding some specification to the packaging of these items that is known as active packaging. Although this packaging can reduce the deteriorating rate of products, but may be increases the cost of both supplier and buyer. Because of the complexity of the mathematical model, a genetic algorithm has been developed to determine the best policy of this inventory control system.

  5. Towards an Integrated Assessment Model for Tropospheric Ozone-Emission Inventories, Scenarios and Emission-control Options

    OpenAIRE

    Olsthoorn, X.

    1994-01-01

    IIASA intends to extend its RAINS model for addressing the issue of transboundary ozone air pollution. This requires the development of a VOC-emissions module, VOCs being precursors in ozone formation. The module should contain a Europe-wide emission inventory, a submodule for developing emission scenarios and a database of measures for VOC-emission control, including data about control effectiveness and control costs. It is recommended to use the forthcoming CORINAIR90 inventory for construc...

  6. Cuba: Juragua NPP. Project Control. Annex 5

    International Nuclear Information System (INIS)

    Serradet, M.A.

    1999-01-01

    This annex deals with project control. The long suspension of Juragua NPP has affected personnel, equipment and site structures. Efforts are being made to revive the plant and to protect existing resources (assets). An action plan has been prepared. (author)

  7. A soft computing-based approach to optimise queuing-inventory control problem

    Science.gov (United States)

    Alaghebandha, Mohammad; Hajipour, Vahid

    2015-04-01

    In this paper, a multi-product continuous review inventory control problem within batch arrival queuing approach (MQr/M/1) is developed to find the optimal quantities of maximum inventory. The objective function is to minimise summation of ordering, holding and shortage costs under warehouse space, service level and expected lost-sales shortage cost constraints from retailer and warehouse viewpoints. Since the proposed model is Non-deterministic Polynomial-time hard, an efficient imperialist competitive algorithm (ICA) is proposed to solve the model. To justify proposed ICA, both ganetic algorithm and simulated annealing algorithm are utilised. In order to determine the best value of algorithm parameters that result in a better solution, a fine-tuning procedure is executed. Finally, the performance of the proposed ICA is analysed using some numerical illustrations.

  8. Constructing a Cross-Domain Resource Inventory: Key Components and Results of the EarthCube CINERGI Project.

    Science.gov (United States)

    Zaslavsky, I.; Richard, S. M.; Malik, T.; Hsu, L.; Gupta, A.; Grethe, J. S.; Valentine, D. W., Jr.; Lehnert, K. A.; Bermudez, L. E.; Ozyurt, I. B.; Whitenack, T.; Schachne, A.; Giliarini, A.

    2015-12-01

    While many geoscience-related repositories and data discovery portals exist, finding information about available resources remains a pervasive problem, especially when searching across multiple domains and catalogs. Inconsistent and incomplete metadata descriptions, disparate access protocols and semantic differences across domains, and troves of unstructured or poorly structured information which is hard to discover and use are major hindrances toward discovery, while metadata compilation and curation remain manual and time-consuming. We report on methodology, main results and lessons learned from an ongoing effort to develop a geoscience-wide catalog of information resources, with consistent metadata descriptions, traceable provenance, and automated metadata enhancement. Developing such a catalog is the central goal of CINERGI (Community Inventory of EarthCube Resources for Geoscience Interoperability), an EarthCube building block project (earthcube.org/group/cinergi). The key novel technical contributions of the projects include: a) development of a metadata enhancement pipeline and a set of document enhancers to automatically improve various aspects of metadata descriptions, including keyword assignment and definition of spatial extents; b) Community Resource Viewers: online applications for crowdsourcing community resource registry development, curation and search, and channeling metadata to the unified CINERGI inventory, c) metadata provenance, validation and annotation services, d) user interfaces for advanced resource discovery; and e) geoscience-wide ontology and machine learning to support automated semantic tagging and faceted search across domains. We demonstrate these CINERGI components in three types of user scenarios: (1) improving existing metadata descriptions maintained by government and academic data facilities, (2) supporting work of several EarthCube Research Coordination Network projects in assembling information resources for their domains

  9. Tritium inventory control--the experience with DT tokamaks and its relevance for future machines

    International Nuclear Information System (INIS)

    Bell, A.C.; Gentile, C.A.; Laesser, R.L.K.; Coad, J.P.

    2003-01-01

    At present, the commercial use of tritium is relatively small scale. The main source of supply is as a by-product of heavy water moderated fission reactors and the products are mainly discrete sources or tracers with activity typically in the GBq range. There are in general no restrictions on the use of tritium other than those, which would normally apply to the use of radioactive material. The future use of tritium as intermediate fuel for a fusion power plant series will involve an increase by several orders of magnitude in the industrial use of tritium and may increase concerns relating to safety, transport and waste disposal. In addition, the use of tritium in fusion power will be unable to be satisfied by current sources of supply and tritium production in future fusion power plants will be essential for the operation of the plants as well as for the start of new ones. Power plant studies have, however, shown that these issues can be satisfactorily addressed. In addition the values for clearance of tritiated materials in a number of countries are consistent with the low environmental impact of disposal of tritiated waste. There are, however, many practical operational and regulatory problems, which will need to be solved in the context of the experimental programmes. The current regulations for control and accountancy of tritium inventory, as applied internationally and in specific countries, are reviewed and their influence on the DT fuel cycle considered. The effect of safety case limits on the need for control of tritium inventory in TFTR, JET and ITER is analysed. The sensitivity of the fuel cycle to tritium inventory is considered. The experience of controlling tritium inventory in TFTR and JET is reviewed and the latest results from JET presented. This takes into account the limits and constraints, the differing requirements for tritium processing, in-vessel retention, the needs for waste management and decommissioning including detritiation, and

  10. Evolutional Optimization on Material Ordering and Inventory Control of Supply Chain through Incentive Scheme

    Science.gov (United States)

    Prasertwattana, Kanit; Shimizu, Yoshiaki; Chiadamrong, Navee

    This paper studied the material ordering and inventory control of supply chain systems. The effect of controlling policies is analyzed under three different configurations of the supply chain systems, and the formulated problem has been solved by using an evolutional optimization method known as Differential Evolution (DE). The numerical results show that the coordinating policy with the incentive scheme outperforms the other policies and can improve the performance of the overall system as well as all members under the concept of supply chain management.

  11. Enhancements to inventory control procedures used at Koeberg nuclear power station

    International Nuclear Information System (INIS)

    Barker, M.P.; Adams, A.R.

    1991-01-01

    In industry today, industrial engineers are forced to seek new and innovative ideas to reduce costs. This can often be accomplished by simplified or modernized operational procedures. With the advancement in computer technology, operational procedures can be enhanced. Despite the fact that Eskom's Koeberg nuclear power station is one of a kind in Africa, it, like most other industries requires a large stock holding capacity. There are currently 25 000 stock items in the Koeberg Stores Information System. Controlling all of these items is no minor task and management is continually trying to optimise the inventory control procedures. One of these procedures is described. 3 refs., 1 fig

  12. An inventory model of instantaneous deteriorating items with controllable deterioration rate for time dependent demand and holding cost

    Directory of Open Access Journals (Sweden)

    Vinod Kumar Mishra

    2013-06-01

    Full Text Available Purpose: The purpose of this paper to develop an inventory model for instantaneous deteriorating items with the consideration of the facts that the deterioration rate can be controlled by using the preservation technology (PT and the holding cost & demand rate both are linear function of time which was treated as constant in most of the deteriorating inventory model. Design/methodology/approach: Developed the mathematical equation of deterministic deteriorating inventory model in which demand rate and holding cost both is linear function of time, deterioration rate is constant, backlogging rate is variable and depend on the length of the next replenishment, shortages are allowed and partially backlogged and obtain an analytical solution which optimizes the total cost of the proposed inventory model. Findings: The model can be applied for optimizing the total inventory cost of deteriorating items inventory for such business enterprises where they use the preservation technology to control the deterioration rate under other assumptions of the model. Originality/value: The inventory system for deteriorating items has been an object of study for a long time, but little is known about the effect of investing in reducing the rate of product deterioration and their significant impact in the business. The proposed model is effective as well as efficient for the business organization that uses the preservation technology to reduce the deterioration rate of the instantaneous deteriorating items of the inventory.

  13. Emissions inventories for urban airshed model application in the Philadelphia Aqcr (Air Quality Control Region)

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    This report documents the procedures used to develop emissions input required by the Urban Airshed photochemical oxidant model. Ambient air quality data were gathered as part of another effort during the summer of 1979 in Philadelphia to be used in the model validation effort. For 1979 and the 1987 projection year, ES compiled hour by hour emissions data for a representative weekday in the oxidant season. The pollutants inventoried are five categories of VOC required by the Airshed model, four categories of VOC defined in RAPS, NO, NO2, CO, SO2, and TSP. Point and area sources were considered with the highway vehicle portion of the inventory being subcontracted to DVRPC. County level area source data were allocated to a 502-cell grid system. Projections were made so that ozone air quality in 1987 could be investigated. ES developed annualized EIS/PandR data and data files containing temporal and VOC/NOx profiles in order to generate the data packets required by the Airshed model.

  14. Inventory of electronic money as method of its control: process approach

    Directory of Open Access Journals (Sweden)

    A.Р. Semenets

    2016-09-01

    Full Text Available The extent of legal regulation of inventory of electronic money in the company is considered. The absence of developed techniques of valuation as well as reflection of electronic money on the accounts, which results in distortion of indicators of financial statements are detected. The author develops the organizational and methodical provisions of inventory of electronic money in accordance with the stages that will ensure the avoidance of misstatements in the financial statements and providing users with more reliable information about the amount and as well as oddments of electronic money at the company on the balance sheet date. The effect of accounting policies, provisions for the organization of accounting as well as job description on the control system for transactions with electronic money, including their inventory, are determined. The author discovers the typical violations that occur during reflecting the transactions with electronic money in accounting, early detection of which will enable appropriate adjustments for the avoidance of misstatements of the information provided in the financial statements of the company.

  15. The Evaluation of Internal Control Implementation Over Merchandise Inventory at PT. Suramando (Pharmaceutical Distributors and General Suppliers) in Manado

    OpenAIRE

    Runtu, Treesje; Seredei, Srijantri

    2015-01-01

    Inventory is a firms current assets, that its amount is material and constituting one of essential factor in the corporate operational activity. That is why a good internal controls to must be done secure supplies from the acts of fraud, deviation and damage. The purpose of this study is to evaluate the internal control over merchandise inventory at PT. Suramando it is running well. The method used is qualitative method through descriptive analysis. The final conclusion is that based on the e...

  16. Superfund and Toxic Release Inventory Sites - INSTITUTIONAL_CONTROLS_IDEM_IN.SHP: Institutional Control Sites in Indiana (Indiana Department of Environmental Management, Polygon Shapefile)

    Data.gov (United States)

    NSGIC State | GIS Inventory — INSTITUTIONAL_CONTROLS_IDEM_IN is a polygon shapefile that contains Institutional Control (IC) site locations in Indiana, provided by personnel of Indiana Department...

  17. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    Science.gov (United States)

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  18. A Dynamic Bayesian Network Model for the Production and Inventory Control

    Science.gov (United States)

    Shin, Ji-Sun; Takazaki, Noriyuki; Lee, Tae-Hong; Kim, Jin-Il; Lee, Hee-Hyol

    In general, the production quantities and delivered goods are changed randomly and then the total stock is also changed randomly. This paper deals with the production and inventory control using the Dynamic Bayesian Network. Bayesian Network is a probabilistic model which represents the qualitative dependence between two or more random variables by the graph structure, and indicates the quantitative relations between individual variables by the conditional probability. The probabilistic distribution of the total stock is calculated through the propagation of the probability on the network. Moreover, an adjusting rule of the production quantities to maintain the probability of a lower limit and a ceiling of the total stock to certain values is shown.

  19. Gravity insensitive inventory control device for a two-phase flow system

    International Nuclear Information System (INIS)

    Bland, T.J.

    1987-01-01

    A liquid inventory control device is described for a flow system where the liquid changes phase to a vapor and back and a pitot pump separates vapor from liquid and pumps the liquid to a component of the flow system comprising: a liquid storage device for storing liquid under pressure, a tube positioned within the pitot pump and in open communication with the liquid storage device, and the tube having an opening positioned within the pitot pump at a location to establish a desired liquid level in the pitot pump and at which level the pressure at the pitot tube inlet will equal the liquid pressure at the liquid storage device

  20. Radiological control for 203Hg radiotracer determinations of mercury inventories at chlor-alkali plants.

    Science.gov (United States)

    Martin, J E; Lee, C

    2001-11-01

    20Hg has been used safely to determine mercury inventories in large electrochemical process cells in the chlorine industry by a process of isotopic dilution. Laboratory conversion and processing of irradiated HgO can be done in closed systems with non-detectable releases to work areas or the environment and with exposure to whole body <0.25 mSv (25 mrem) and <3 mSv (300 mrem) to extremities. Personnel exposures during plant operations are controlled to non-detectable levels for whole body exposure and <0.3 mSv (30 mrem) to extremities for the operator; exposures for other plant personnel are non-detectable.

  1. Airline seat inventory control benefiting from currency differentials to enhance revenues

    Directory of Open Access Journals (Sweden)

    C.E. Love

    2003-12-01

    Full Text Available The purpose of this paper is to develop an airline seat inventory control model which will capitalise on currency differentials that exist between city pairs. The approach taken here is to maximise Expected Marginal Seat Revenues as proposed by Belobaba for non-nested fare classes. the basic Expected Marginal Seat Revenue model is extended to explicitly include the effects of overbooking. Data from the South African Airways return flight between Cape Town and London is utilised to demonstrate the model.

  2. The JET PCU project: An international plasma control project

    International Nuclear Information System (INIS)

    Sartori, F.; Crisanti, F.; Albanese, R.; Ambrosino, G.; Toigo, V.; Hay, J.; Lomas, P.; Rimini, F.; Shaw, S.R.; Luchetta, A.; Sousa, J.; Portone, A.; Bonicelli, T.; Ariola, M.; Artaserse, G.; Bigi, M.; Card, P.; Cavinato, M.; De Tommasi, G.; Gaio, E.

    2008-01-01

    This paper describes the new JET enhancement project 'Plasma Control Upgrade' (PCU). Initially aimed at an overhaul of JET plasma control capabilities it was eventually focused on improving the vertical stabilisation (VS) system ability to recover from large ELM (edge localised mode) perturbations. The paper describes the results of the first two years where the activity was aimed principally at researching a solution that could be implemented within the timing and budget constraints. A very important task was that of improving the modelling of JET plasma, iron core and passive structures. Using dedicated experiments, the models were progressively refined until it was possible not just to explain the experimental data but predict the VS system behaviour. At the same time the project team studied the best options for power supply (PS) and control system upgrades and evaluated whether a change of turns in the stabilisation coil was desirable and possible. A new fast radial field power supply is now being ordered and the VS control system is being upgraded

  3. Expected value based fuzzy programming approach to solve integrated supplier selection and inventory control problem with fuzzy demand

    Science.gov (United States)

    Sutrisno; Widowati; Sunarsih; Kartono

    2018-01-01

    In this paper, a mathematical model in quadratic programming with fuzzy parameter is proposed to determine the optimal strategy for integrated inventory control and supplier selection problem with fuzzy demand. To solve the corresponding optimization problem, we use the expected value based fuzzy programming. Numerical examples are performed to evaluate the model. From the results, the optimal amount of each product that have to be purchased from each supplier for each time period and the optimal amount of each product that have to be stored in the inventory for each time period were determined with minimum total cost and the inventory level was sufficiently closed to the reference level.

  4. Self-statements, self-esteem, and locus of control in discriminating college students' scores on the Beck Depression Inventory.

    Science.gov (United States)

    Madonna, S; Philpot, V D

    1996-04-01

    To study the use of the ratio of positive to negative self-statements, locus of control, and self-esteem in discriminating between scores on the Beck Depression Inventory 145 undergraduate college students were administered the Beck Depression Inventory, Automatic Thoughts Questionnaire-Revised, Coopersmith Self-esteem Inventory-Adult Form, and the Rotter Locus of Control scale in their classrooms. A stepwise discriminant analysis indicated that five variables combined to yield a statistically significant discrimination among low, middle, and high scores on the Beck Depression Inventory. The classification analysis indicated that 77.1% (n = 111) of the undergraduate students were correctly classified; 93.2% (82 of 88) were correctly classified as low scorers and 73.3% (18 of 46) were correctly classified as high scorers.

  5. INVENTORY OF ECOSYSTEM RESTORATION PROJECTS - PUBLISHED ON THE OFFICE OF WATER WEB PAGE

    Science.gov (United States)

    USEPA's National Risk Management Research Laboratory working jointly with the Office of Water, has developed an Internet-accessible database of ecosystem restoration projects within the Mid-Atlantic Integrated Assessment (MAIA) region. This article informs project owners of the i...

  6. The Italian bat roost project: a preliminary inventory of sites and conservation perspectives

    Directory of Open Access Journals (Sweden)

    Gruppo Italiano di Ricerca sui Chirotter GIRC

    2005-01-01

    Full Text Available Abstract The Italian bat roost project, launched by the Italian Chiroptera Research Group (GIRC, aims to develop a constantly updated national database of bat roosts. Short-term objectives are to inventory roosts and identify the most important ones from a conservation perspective, in order to set priorities for management actions. Published records and field data from 1990 onwards are filed. To date, the database contains 1243 records from 750 roosts, covering 352 10x10 km UTM grid-cells. Among roosts, 167 were used for hibernation (S roosts, 244 for breeding (R roosts and 431 as either temporary roosts or for unknown needs, not verified or not considered in the survey (X roosts. Roosting sites occurred in buildings (45.1%, caves (35.3%, artificial underground sites (10.3%, trees (5.5%, bridges (2.1%, bat boxes (1.3% and rocky cliffs (0.4%. At least 29 species were found, and the number of roosts per species ranged between 1 and 261. S and/or R roosts fulfilling certain combinations of number of species and individuals or having at least 50 individuals of species cited in Annex II of the 92/43/EEC Directive (excluding Miniopterus schreibersii, adding Myotis punicus were classified as sites of special conservation interest. When meeting at least one such conditions, type X roosts that were not classified as either S or R, were considered potential sites of special conservation interest, for which further data collection is recommended. In all, 97 roosts of special conservation interest were identified: 30 S roosts, 60 R roosts and 7 roosts selected for both hibernation and breeding. 20 X roosts were identified as potential sites of special conservation interest. For at least 93.7% of roosts, factors potentially harming the bats were documented, particularly people access to the roost, and renovation of buildings used as a roost. In almost two thirds of such cases it was judged that conservation was not ensured

  7. Amoco/Environmental Protection Agency Pollution Prevention Project, Yorktown refinery. Refinery release inventory. Final report

    International Nuclear Information System (INIS)

    Klee, H.; Kizier, G.J.; Baloo, S.; Hockman, E.L.; Couzens-Roberts, C.

    1992-07-01

    The report volume summarizes physical data obtained during a 2-year pollution prevention study of Amoco Oil Company's Yorktown Virginia Refinery. The study was jointly sponsored as a cooperative effort of Amoco Corporation and the United States Environmental Protection Agency. A multi-media sampling program was used to identify potential pollution sources within the Refinery. Sampling and analysis included air, surface water, groundwater, and solid waste data. Public perceptions about environmental issues of concern in the vicinity of the Refinery were also surveyed. The inventory showed that nearly 99 percent of the releases were airborne at the facility. Most of the remainder involved land disposal of solid wastes. Specific sources of major pollutants are identified

  8. Slovakia: Mochovce NPP. Project control. Annex 10

    International Nuclear Information System (INIS)

    Bodorik, K.

    1999-01-01

    This annex deals with project control. Mochovce NPP suffered considerable delay primarily due to lack of money. This situation was corrected and construction resumed in 1996. Throughout the 'dormant' period the plant received considerable support from the major contractors, who maintained skeleton staff at site. Significant safety and managerial improvements are being introduced and a strategic plan for the plant has been developed. (author)

  9. Spain: Project control. Annex 11B

    International Nuclear Information System (INIS)

    Montes Rodriguez, J.L.

    1999-01-01

    This annex deals with project control. This annex outlines the method of accounting and coding of expenses during the various phases of transition from construction to long-term suspension. In this way costs can be accurately traced and assigned appropriately. This is an essential part of managing during the suspension phase. (author)

  10. Strategically oriented management and controlling of resource intensive projects

    International Nuclear Information System (INIS)

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  11. Control system and nuclear materials inventory at IPEN/CNEN-SP, Brazil

    International Nuclear Information System (INIS)

    Araujo, Jose Adroaldo de; Enokihara, Cyro Teiti

    2002-01-01

    The history, requirements, organization, and operation of the State System of Accounting and Control from the Institute for Energetic and Nuclear Research (IPEN-CNEN/SP) are described. The implementation system at the institution take into consideration the national and international safeguards requirements. It has started by the nuclear material (U, Pu and Th) physical inventory taking, including their provenance and transformation. The earlier computerized accounting system used for control has been replaced by a new one developed by the National Authority (CNEN/CSG). The optimized system has more flexibility, giving a more effective answer to any occurred change on Material Balance Area. The present system make use of an effective methodology. (author)

  12. An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse

    NARCIS (Netherlands)

    Topan, E.; Bayindir, Z.P.; Tan, T.

    2009-01-01

    We consider a multi-item two-echelon inventory system in which the central warehouse operates under a (Q; R) policy, and the local warehouses implement basestock policy. An exact solution procedure is proposed to find the inventory control policy parameters that minimize the system-wide inventory

  13. The LHC experiments' joint controls project (JCOP)

    International Nuclear Information System (INIS)

    Wayne Salter

    2001-01-01

    The development and maintenance of the control systems of the four Large Hadron Collider (LHC) experiments will require a non-negligible amount of resources and effort. In order to minimise the overall effort required the Joint Controls Project (JCOP) was set-up as a collaboration between CERN and the four LHC experiments to find and implement common solutions for the control of the LHC experiments. It is one of the few examples of such a wide collaboration and therefore the existence of the JCOP project is extremely significant. The author will give a brief overview of the project, its structure and its history. It will go on to summarise the various sub-projects that have been initiated under the auspices of JCOP together will their current status. It will highlight that the JCOP general principle is to promote the use of industrial solutions wherever possible. However, this does not rule out the provision of custom solutions when non-standard devices or very large numbers of devices have to be controlled. The author will also discuss the architecture foreseen by JCOP and where in this architecture the various types of solutions are expected to be used. Finally, although the selection of common industrial and custom solutions is a necessary condition for JCOP to succeed, the use of these solutions in themselves would not necessarily lead to the production of homogeneous control systems. Therefore, the author will finish with a description of the JCOP Framework, which is being developed to promote the use of these common solutions, to reduce the development effort required by the various experiment development teams and to help to build and integrate control systems which can be more easily maintained

  14. Production Supervision Incorporated With Network Technology-A Solution For Controlling In-Process Inventory

    Directory of Open Access Journals (Sweden)

    Suraj Yadav

    2013-06-01

    Full Text Available In context to the manufacturing management in medium scale production floor, work-in-process (WIP management or the inprocess inventory and control as the inevitable result of the production process has become a vital link of production plan. Due to the growing production requirements and the potential economic benefits of manufacturing process flow, enterprises have been pushed to integrate work-in-process management with their manufacturing process and the larger the company the larger the list of in-process inventory and this all are typically hard to manage so for the same respect the author in this paper has lighted on the integration of sophisticated electronics and networking technologies with the W.I.P with an native and low cost solution for managing the same, specially for the medium scaled company dealing with large number of product or with the customized product with reference to study of present scenario of a multinational company’s plant engineering department.

  15. Optimizing Multi-Product Multi-Constraint Inventory Control Systems with Stochastic Replenishments

    Science.gov (United States)

    Allah Taleizadeh, Ata; Aryanezhad, Mir-Bahador; Niaki, Seyed Taghi Akhavan

    Multi-periodic inventory control problems are mainly studied employing two assumptions. The first is the continuous review, where depending on the inventory level orders can happen at any time and the other is the periodic review, where orders can only happen at the beginning of each period. In this study, we relax these assumptions and assume that the periodic replenishments are stochastic in nature. Furthermore, we assume that the periods between two replenishments are independent and identically random variables. For the problem at hand, the decision variables are of integer-type and there are two kinds of space and service level constraints for each product. We develop a model of the problem in which a combination of back-order and lost-sales are considered for the shortages. Then, we show that the model is of an integer-nonlinear-programming type and in order to solve it, a search algorithm can be utilized. We employ a simulated annealing approach and provide a numerical example to demonstrate the applicability of the proposed methodology.

  16. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  17. Predictive Optimal Control of Active and Passive Building Thermal Storage Inventory

    Energy Technology Data Exchange (ETDEWEB)

    Gregor P. Henze; Moncef Krarti

    2005-09-30

    Cooling of commercial buildings contributes significantly to the peak demand placed on an electrical utility grid. Time-of-use electricity rates encourage shifting of electrical loads to off-peak periods at night and weekends. Buildings can respond to these pricing signals by shifting cooling-related thermal loads either by precooling the building's massive structure or the use of active thermal energy storage systems such as ice storage. While these two thermal batteries have been engaged separately in the past, this project investigated the merits of harnessing both storage media concurrently in the context of predictive optimal control. To pursue the analysis, modeling, and simulation research of Phase 1, two separate simulation environments were developed. Based on the new dynamic building simulation program EnergyPlus, a utility rate module, two thermal energy storage models were added. Also, a sequential optimization approach to the cost minimization problem using direct search, gradient-based, and dynamic programming methods was incorporated. The objective function was the total utility bill including the cost of reheat and a time-of-use electricity rate either with or without demand charges. An alternative simulation environment based on TRNSYS and Matlab was developed to allow for comparison and cross-validation with EnergyPlus. The initial evaluation of the theoretical potential of the combined optimal control assumed perfect weather prediction and match between the building model and the actual building counterpart. The analysis showed that the combined utilization leads to cost savings that is significantly greater than either storage but less than the sum of the individual savings. The findings reveal that the cooling-related on-peak electrical demand of commercial buildings can be considerably reduced. A subsequent analysis of the impact of forecasting uncertainty in the required short-term weather forecasts determined that it takes only very

  18. Development of A Web-Based Information System for Material Inventory Control: The Case of An Automotive Company

    OpenAIRE

    Renjana Setyoandara Wibisono; Tanika D Sofianti; Setijo Awibowo

    2016-01-01

    Inventory control is controlling the materials movement to fulfill the requirements. The materials can from the direct and indirect materials. the indirect materials are the materials that cannot be calculated according to the bill of materials. Indirect materials need safety stocks, so the requirements can always be fulfilled, means it need the control and monitoring of their levels. To control the movement of the materials, each department have roles to control and information that need to ...

  19. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  20. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  1. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Joo, Po Kook; Kim, Gye Ryung (and others)

    2003-06-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the subprojects from the various fields, It has been tried to make the subprojects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, TRM(Technology Road Map) is made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  2. Optimizing models for production and inventory control using a genetic algorithm

    Directory of Open Access Journals (Sweden)

    Dragan S. Pamučar

    2012-01-01

    Full Text Available In order to make the Economic Production Quantity (EPQ model more applicable to real-world production and inventory control problems, in this paper we expand this model by assuming that some imperfect items of different product types being produced such as reworks are allowed. In addition, we may have more than one product and supplier along with warehouse space and budget limitation. We show that the model of the problem is a constrained non-linear integer program and propose a genetic algorithm to solve it. Moreover, a design of experiments is employed to calibrate the parameters of the algorithm for different problem sizes. In the end, a numerical example is presented to demonstrate the application of the proposed methodology.

  3. Analysis of the impact of the Dutch Heat Act on projects and an inventory of stakeholders

    International Nuclear Information System (INIS)

    Budding, B.; Gerrits, W.; Grootscholten, C.

    2010-08-01

    The Dutch Heat Act was adopted by the Dutch Lower Chamber in February 2009. The main aim of the Act is reliable delivery of heat at reasonable prices and conditions to protect the consumer. The Dutch Ministry of Economic Affairs commissioned a study on the effect of the Heat Act on investment decisions for new heat projects, encompassing a quantitative and a qualitative assessment. [nl

  4. Framework for virtual control desk projects

    Energy Technology Data Exchange (ETDEWEB)

    Mol, Antonio Carlos A.; Freitas, Victor Goncalves G.; Espieito Santos, Andre Cotelli do; Aghina, Mauricio A. da C. e, E-mail: mol@ien.gov.b, E-mail: vgoncalves@ien.gov.b, E-mail: mag@ien.gov.b [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2011-07-01

    Through the recent advances of the Brazilian nuclear program, the creation of virtual control desks allows an ergonomic evaluation and technique of the same, even before its physical implementation, reducing costs and time in addition to allow the virtual training of operators. This project intends to develop a 'framework' where the components of a real control desk are available for creating a virtual desk, continuing the project control desk developed at the Laboratorio de Interface Homem Sistema do IEN (LABHIS/IEN). Through the C++ programming language integrated with the OPENGL graphics library was possible to create the desk and it's components, allowing a graphical modeling in 3D (stereo) of a virtual control desk where the operator, with the aid of GLUI user interface library, can choose what and where the components are positioned on the bench, and select the type of desk wanted from the pre-defined templates. Finally, with the control desk mounted and configured, enabling a virtual interaction with operators, making possible to reproduce its functionalities. (author)

  5. Framework for virtual control desk projects

    International Nuclear Information System (INIS)

    Mol, Antonio Carlos A.; Freitas, Victor Goncalves G.; Espieito Santos, Andre Cotelli do; Aghina, Mauricio A. da C. e

    2011-01-01

    Through the recent advances of the Brazilian nuclear program, the creation of virtual control desks allows an ergonomic evaluation and technique of the same, even before its physical implementation, reducing costs and time in addition to allow the virtual training of operators. This project intends to develop a 'framework' where the components of a real control desk are available for creating a virtual desk, continuing the project control desk developed at the Laboratorio de Interface Homem Sistema do IEN (LABHIS/IEN). Through the C++ programming language integrated with the OPENGL graphics library was possible to create the desk and it's components, allowing a graphical modeling in 3D (stereo) of a virtual control desk where the operator, with the aid of GLUI user interface library, can choose what and where the components are positioned on the bench, and select the type of desk wanted from the pre-defined templates. Finally, with the control desk mounted and configured, enabling a virtual interaction with operators, making possible to reproduce its functionalities. (author)

  6. Control panel and indicators for production control in building projects

    Directory of Open Access Journals (Sweden)

    Orihuela Pablo

    2018-02-01

    Full Text Available In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230, presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

  7. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  8. Anomaly detection for analysis of annual inventory data: a quality control approach

    Science.gov (United States)

    Francis A. Roesch; Paul C. Van Deusen

    2010-01-01

    Annual forest inventories present special challenges and opportunities for those analyzing the data arising from them. Here, we address one question currently being asked by analysts of the US Forest Service’s Forest Inventory and Analysis Program’s quickly accumulating annual inventory data. The question is simple but profound: When combining the next year’s data for...

  9. Myopic control of stochastic inventories with intermittent updates: continuous versus periodic replenishment

    OpenAIRE

    M Shnaiderman

    2012-01-01

    A manufacturer who is responsible for supplying a retailer with a single product is considered. The retailer sells the product in response to stochastic demand and provides the manufacturer with periodic updates about his inventories. Replenishing the retailer's inventory under two myopic base-stock policies is addressed. These policies, referred to as vendor managed inventory, represent a relatively new approach to allocating responsibility in the replenishment process. Specifically, the man...

  10. Nuclear outages: an approach to project controls

    International Nuclear Information System (INIS)

    Bryson, R.

    1985-01-01

    The annual budget for maintaining and operating a nuclear power plant has risen dramatically over the past 5 years. NRC-mandated plant improvements and outage related expenses are often cited to be the main contributors to these escalating budgets. Nuclear utilities have responded by developing programs to improve plant availability and outage costs through improved outage performance. Utilities recognize that for capital improvements the program to control costs does no begin with outage planning, but rather more appropriately up front during the engineering phase. To support their management objectives, utilities have been developing comprehensive project control systems for concurrently reducing capital expenditures, outage-related costs, and time. This paper provides an approach to project controls that, rather than using one all inclusive comprehensive system, requires five separate monitoring systems - one for each phase of an activity's life cycle. Through the integration of these discrete but interrelated systems, utility management acquires the necessary tools for comprehensive planning and control of their modification program and effective detailed monitoring for all outage-related activities

  11. Project Aquarius. Control of radioisotopes and safety

    Energy Technology Data Exchange (ETDEWEB)

    Post, Roy G [Department of Nuclear Engineering, University of Arizona (United States)

    1970-05-15

    The potential application of nuclear explosives to the development of water resources provides real hope for substantial increases in the availability of water from our natural water supplies. A wide range, exploratory project sponsored by the United States Atomic Energy Commission, the Bureau of Reclamation, the Arizona Atomic Energy Commission, and The University of Arizona was conducted by the Hydrology and Water Resources Office, the Department of Nuclear Engineering, and various state and federal governmental agencies in exploring the potential applications of nuclear explosives for developing water resources in the State of Arizona. The primary objective of the project was of a scouting nature, a reconnaissance effort to assess the potential for Arizona. This work, Project Aquarius, is at an early state and any significant conclusions are certainly premature. Since this is a survey, detailed analyses are not justified. Our purpose is to define limiting problems and estimate our ability to solve them. We do not seek to formulate a detailed solution until the project has been defined better. In all of the plowshare activities the primary responsibility of the Atomic Energy Commission for safety and control of not only radiological but all hazards has been well defined and documented. Thus, the work here does not reflect any opinion or voice of the Atomic Energy Commission but is based on my own views and conclusions. I have referred to the work of the various laboratories, offices, and contractors of the Atomic Energy Commission.

  12. Project Aquarius. Control of radioisotopes and safety

    International Nuclear Information System (INIS)

    Post, Roy G.

    1970-01-01

    The potential application of nuclear explosives to the development of water resources provides real hope for substantial increases in the availability of water from our natural water supplies. A wide range, exploratory project sponsored by the United States Atomic Energy Commission, the Bureau of Reclamation, the Arizona Atomic Energy Commission, and The University of Arizona was conducted by the Hydrology and Water Resources Office, the Department of Nuclear Engineering, and various state and federal governmental agencies in exploring the potential applications of nuclear explosives for developing water resources in the State of Arizona. The primary objective of the project was of a scouting nature, a reconnaissance effort to assess the potential for Arizona. This work, Project Aquarius, is at an early state and any significant conclusions are certainly premature. Since this is a survey, detailed analyses are not justified. Our purpose is to define limiting problems and estimate our ability to solve them. We do not seek to formulate a detailed solution until the project has been defined better. In all of the plowshare activities the primary responsibility of the Atomic Energy Commission for safety and control of not only radiological but all hazards has been well defined and documented. Thus, the work here does not reflect any opinion or voice of the Atomic Energy Commission but is based on my own views and conclusions. I have referred to the work of the various laboratories, offices, and contractors of the Atomic Energy Commission

  13. WHE-PAGER Project: A new initiative in estimating global building inventory and its seismic vulnerability

    Science.gov (United States)

    Porter, K.A.; Jaiswal, K.S.; Wald, D.J.; Greene, M.; Comartin, Craig

    2008-01-01

    The U.S. Geological Survey’s Prompt Assessment of Global Earthquake’s Response (PAGER) Project and the Earthquake Engineering Research Institute’s World Housing Encyclopedia (WHE) are creating a global database of building stocks and their earthquake vulnerability. The WHE already represents a growing, community-developed public database of global housing and its detailed structural characteristics. It currently contains more than 135 reports on particular housing types in 40 countries. The WHE-PAGER effort extends the WHE in several ways: (1) by addressing non-residential construction; (2) by quantifying the prevalence of each building type in both rural and urban areas; (3) by addressing day and night occupancy patterns, (4) by adding quantitative vulnerability estimates from judgment or statistical observation; and (5) by analytically deriving alternative vulnerability estimates using in part laboratory testing.

  14. LQ Optimal Sliding Mode Control of Periodic Review Perishable Inventories with Transportation Losses

    Directory of Open Access Journals (Sweden)

    Piotr Leśniewski

    2013-01-01

    Full Text Available In this work we apply the control-theoretic approach to design a new replenishment strategy for inventory systems with perishable stock. Such systems are supposed to effectively satisfy an unknown and permanently time-varying consumers’ demand. The main obstacle of achieving this goal is the need of obtaining supplies from a distant source. During the supply process goods are inevitably lost due to various causes. Furthermore, those goods which successfully arrive at the distribution center still deteriorate while stored in its warehouse. We explicitly take into account both of these factors in designing our control strategy. We propose a sliding mode strategy and choose its parameters to minimize a quadratic quality criterion. This approach allows us to ameliorate the bullwhip effect (the amplification of the demand variations when going up in the supply chain. The control strategy proposed in this work ensures bounded orders, guarantees full consumers’ demand satisfaction, and eliminates the risk of exceeding the warehouse capacity. These properties are stated in three theorems and proved in the paper.

  15. Inventory and projection of greenhouse gases emissions for Sumatera Utara Province

    Science.gov (United States)

    Ambarita, H.; Soeharwinto; Ginting, N.; Basyuni, M.; Zen, Z.

    2018-03-01

    Greenhouse Gases (GHGs) emissions which result in global warming is a serious problem for the human being. Total globally anthropogenic GHG emissions were the highest in the history of the year 2000 to 2010 and reached 49 (4.5) Giga ton CO2eq per year in 2010. Many governments addressed their commitment to reducing GHG emission. The Government of Indonesia (GoI) has released a target in reducing its GHG emissions by 26% from level business as usual by 2020, and this target can be increased up to 41% by international aid. In this study, the GHG emissions for Sumatera Utara province are assessed and divided into six sectors. They are Agricultural, Land Use and Forestry, Energy, Transportation, Industrial, and Waste sectors. The results show that total GHG emissions for Sumatera Utara province in the baseline year 2010 is 191.4 million tons CO2eq. The business-as-usual projection of the GHG emission in 2020 is 354.5 million tons CO2eq. Mitigation actions will reduce GHG emissions up to 30.5% from business as usual emission in 2020.

  16. Expected value analysis for integrated supplier selection and inventory control of multi-product inventory system with fuzzy cost

    Science.gov (United States)

    Sutrisno, Widowati, Tjahjana, R. Heru

    2017-12-01

    The future cost in many industrial problem is obviously uncertain. Then a mathematical analysis for a problem with uncertain cost is needed. In this article, we deals with the fuzzy expected value analysis to solve an integrated supplier selection and supplier selection problem with uncertain cost where the costs uncertainty is approached by a fuzzy variable. We formulate the mathematical model of the problems fuzzy expected value based quadratic optimization with total cost objective function and solve it by using expected value based fuzzy programming. From the numerical examples result performed by the authors, the supplier selection problem was solved i.e. the optimal supplier was selected for each time period where the optimal product volume of all product that should be purchased from each supplier for each time period was determined and the product stock level was controlled as decided by the authors i.e. it was followed the given reference level.

  17. Study on inventory control model based on the B2C mode in big data environment

    Directory of Open Access Journals (Sweden)

    Zhiping Zhang

    2017-03-01

    Full Text Available The current inventory problem has become the key issue in the enterprise survival and development. In this paper, we take “Taobao” as an example to conduct a detailed study of the inventory of the high conversion rate based on data mining. First, by using a funnel model to predict the conversion of the commodities on the critical path, we capture the factors influencing the consumer decision-making on each key point, and propose corresponding solutions of improving the conversion rate; Second, we use BP neural network algorithm to predict the goods traffic, and then obtain the corresponding weights by the relation analysis and the output of the goods traffic by the input of large data sample goods; Third, we can predict the inventory in accordance with the commodity conversion rate and flow prediction, and amend the predicted results to get accurate and real-time inventory forecast, avoiding the economic loss due to the inaccurate inventory.

  18. A Confirmatory Factor Analysis of Preservice Teachers' Responses to the Attitudes and Beliefs on Classroom Control Inventory.

    Science.gov (United States)

    Henson, Robin K.; Roberts, J. Kyle

    This study examined the factorial invariance of scores from the Attitudes and Beliefs on Classroom Control Inventory (ABCC) (Martin and others, 1998) for 243 undergraduate preservice teachers. Although the original ABCC was developed with inservice teachers, use of the instrument to study the classroom beliefs of preservice teachers had not been…

  19. Development of a Laser Ablation System Kit (LASK) for Tokamak in vessel tritium and dust inventory control

    International Nuclear Information System (INIS)

    Hernandez, C.; Roche, H.; Pocheau, C.; Grisolia, C.; Gargiulo, L.; Semerok, A.; Vatry, A.; Delaporte, P.; Mercadier, L.

    2009-01-01

    During Tokamak operation, Plasma Facing Components (PFCs) are subjected to severe interaction with plasma. As a consequence and independently of the PFCs composition, materials eroded and then re-deposited in the form of layers on the surfaces, can flake and produce dusts. These fragile structures are able to trap part of the hydrogenated species (tritium for example) in vessel inventory. For safety reasons, it is mandatory to measure and to control vessel dust and tritium inventory. Up to now, laser techniques are a part of the most promising methods able to solve these ITER open issues. Of special interest are laser systems loaded on a miniature tool that can be attached to a Multi Purpose Deployer (MPD) and used for laser treatments (detritiation and other), for PFCs chemical analysis as well as for micro particles recovery of dust produced during laser ablation. Such a system (Laser Ablation System Kit: LASK) is currently under development at IRFM and the following presentation will describe the current achievements of this project and the perspectives. In this paper, we will present an innovative compact system, which, loaded on a Multi Purpose Deployer, could allow operation in a harsh environment (pressure range from atmospheric to Ultra High Vacuum and temperature up to 120 deg. C). According to the process conditions, different treatments can be performed: at low laser fluence, PFCs thermal treatment will be expected, while at high laser fluence material will be ablated allowing Dust (and T) recovery as well as chemical analysis of material. This 'in-line' chemical analysis based on Laser Induced Breakdown Spectroscopy (LIBS) enables the ablation process to be controlled and preserves the substrate integrity. The paper will be focussed on the methodology followed during the LASK development and the method used to determine a laser process window able to remove co-deposited film without damaging the bulk material and taking into account external parameter

  20. Greenidge Multi-Pollutant Control Project

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel

    2008-10-18

    The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including

  1. Dynamic optimization approach for integrated supplier selection and tracking control of single product inventory system with product discount

    Science.gov (United States)

    Sutrisno; Widowati; Heru Tjahjana, R.

    2017-01-01

    In this paper, we propose a mathematical model in the form of dynamic/multi-stage optimization to solve an integrated supplier selection problem and tracking control problem of single product inventory system with product discount. The product discount will be stated as a piece-wise linear function. We use dynamic programming to solve this proposed optimization to determine the optimal supplier and the optimal product volume that will be purchased from the optimal supplier for each time period so that the inventory level tracks a reference trajectory given by decision maker with minimal total cost. We give a numerical experiment to evaluate the proposed model. From the result, the optimal supplier was determined for each time period and the inventory level follows the given reference well.

  2. Optimal Strategy for Integrated Dynamic Inventory Control and Supplier Selection in Unknown Environment via Stochastic Dynamic Programming

    International Nuclear Information System (INIS)

    Sutrisno; Widowati; Solikhin

    2016-01-01

    In this paper, we propose a mathematical model in stochastic dynamic optimization form to determine the optimal strategy for an integrated single product inventory control problem and supplier selection problem where the demand and purchasing cost parameters are random. For each time period, by using the proposed model, we decide the optimal supplier and calculate the optimal product volume purchased from the optimal supplier so that the inventory level will be located at some point as close as possible to the reference point with minimal cost. We use stochastic dynamic programming to solve this problem and give several numerical experiments to evaluate the model. From the results, for each time period, the proposed model was generated the optimal supplier and the inventory level was tracked the reference point well. (paper)

  3. Project Management Effectiveness: the choice - formal or informal controls

    Directory of Open Access Journals (Sweden)

    Jon Heales

    2007-12-01

    Full Text Available Development failures and runaway projects in the information systems (IS area can result in substantial losses to organizations, either financially or to a company’s reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.

  4. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  5. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  6. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  7. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  8. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  9. A critical spare part inventory control based on hazard function approach: A case study in a garment company

    Science.gov (United States)

    Melinda, Intan Dewi; Jauhari, Wakhid Ahmad

    2018-02-01

    Spare part procurement is a complex issue and requires an accurate analysis. Stock outs of spare part can leads a great impact on production. Therefore, it is necessary to design the inventory control of spare parts that guarantee the availability of spare parts needed for supporting the maintenance activity. This paper studies the inventory policy for sewing machine spare part using hazard function to approximate the demand. Hazard function is the indicator of the effect of ageing on the reliability of the system. It quantifies the risk of failure as the age of the system increases. We use a continuous review policy based on Hadley Within Approach to calculate the optimum inventory level for critical spare parts. There are four spare parts categorized as critical spare parts, which are needle plate, feed dog, rotary and binder attachment. The optimal ordering quantity for needle plate, feed, rotary and binder attachment are 5 units, 17 units, 5 units, and 9 units, respectively and the reorder point are 2 units, 1 unit, 2 units and 1 unit, respectively. Finally, the service level achieved by the proposed policy is in a range of 95.91%-97.93%, which indicates that the inventory level of spare parts can be used to support the required parts in the maintenance activity.

  10. Introducing a New Concept Inventory on Climate Change to Support Undergraduate Instruction, Teacher Education, Education Research, and Project Evaluation (Invited)

    Science.gov (United States)

    Morrow, C. A.; Monsaas, J.; Katzenberger, J.; Afolabi, C. Y.

    2013-12-01

    The Concept Inventory on Climate Change (CICC) is a new research-based, multiple-choice 'test' that provides a powerful new assessment tool for undergraduate instructors, teacher educators, education researchers, and project evaluators. This presentation will describe the features and the development process of the (CICC). This includes insights about how the development team (co-authors) integrated and augmented their multi-disciplinary expertise. The CICC has been developed in the context of a popular introductory undergraduate weather and climate course at a southeastern research university (N~400-500 per semester). The CICC is not a test for a grade, but is intended to be a useful measure of how well a given teaching and learning experience has succeeded in improving understanding about climate change and related climate concepts. The science content addressed by the CICC is rooted in the national consensus document, 'Climate Literacy: The Essential Principles of Climate Science'. The CICC has been designed to support undergraduate instruction, and may be valuable in comparable contexts that teach about climate change. CICC results can help to inform decisions about the effectiveness of teaching strategies by 1) flagging conceptual issues (PRE-instruction); and 2) detecting conceptual change (POST-instruction). Specific CICC items and their answer choices are informed by the research literature on common misunderstandings about climate and climate change. Each CICC item is rated on a 3-tier scale of the cognitive sophistication the item is calling for, and there is a balance among all three tiers across the full instrument. The CICC development process has involved data-driven changes to successive versions. Data sources have included item statistics from the administration of progressively evolved versions of the CICC in the weather and climate course, group interviews with students, and expert review by climate scientists, educators, and project evaluators

  11. Inventory control of raw material using silver meal heuristic method in PR. Trubus Alami Malang

    Science.gov (United States)

    Ikasari, D. M.; Lestari, E. R.; Prastya, E.

    2018-03-01

    The purpose of this study was to compare the total inventory cost calculated using the method applied by PR. Trubus Alami and Silver Meal Heuristic (SMH) method. The study was started by forecasting the cigarette demand from July 2016 to June 2017 (48 weeks) using additive decomposition forecasting method. The additive decomposition was used because it has the lowest value of Mean Abosolute Deviation (MAD) and Mean Squared Deviation (MSD) compared to other methods such as multiplicative decomposition, moving average, single exponential smoothing, and double exponential smoothing. The forcasting results was then converted as a raw material needs and further calculated using SMH method to obtain inventory cost. As expected, the result shows that the order frequency of using SMH methods was smaller than that of using the method applied by Trubus Alami. This affected the total inventory cost. The result suggests that using SMH method gave a 29.41% lower inventory cost, giving the cost different of IDR 21,290,622. The findings, is therefore, indicated that the PR. Trubus Alami should apply the SMH method if the company wants to reduce the total inventory cost.

  12. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  13. The Study on quality control of nuclear power installation project

    International Nuclear Information System (INIS)

    Wu Jie

    2008-01-01

    The quality planning, quality assurance and quality control are discussed by applying the quality control (QC) theory and combining the real situation of the Qinshan II project. This paper is practical and plays an active role in instruction of project quality control by applying the above QC theory and control techniques. (authors)

  14. INMACS: Operating experience of a mature, computer-assisted control system for nuclear material inventory and criticality safety

    International Nuclear Information System (INIS)

    Ross, A.M.

    1983-01-01

    This paper describes the operating experience of INMACS, the Integrated Nuclear Material Accounting and Control System used in the Recycle Fuel Fabrication Laboratories at Chalk River. Since commissioning was completed in 1977, INMACS has checked and recorded approximately 3000 inventory-related transactions involved in fabricating thermal-recycle fuels of (U,Pu)0 2 and (Th,Pu)0 2 . No changes have been necessary to INMACS programs that are used by laboratory staff when moving or processing nuclear material. The various utility programs have allowed efficient management and surveillance of the INMACS data base. Hardware failures and the nuisance of system unavailability at the laboratory terminals have been minimized by regular preventative maintenance. The original efforts in the design and rigorous testing of programs have helped INMACS to be accepted enthusiastically by old and new staff of the laboratories. The work required for nuclear material inventory control is done efficiently and in an atmosphere of safety

  15. NCRN Hemlock Inventory Data

    Data.gov (United States)

    Department of the Interior — ​Data associated with the 2015 hemlock inventory project in NCR. Eastern hemlock (Tsuga canadensis) is a coniferous tree native to the NE and Appalachian regions of...

  16. The Integrated Data Base program: An executive-level data base of spent fuel and radioactive waste inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    Klein, J.A.

    1987-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. As such, it should be as convenient to utilize as is practical. Examples of summary-level tables and figures are presented, as well as more-detailed graphics describing waste-form distribution by site and line charts illustrating historical and projected volume (or mass) changes. This information is readily accessible through the annual IDB publication. Other presentation formats are also available to the DOE community through a simple request to the IDB Program

  17. The impact of consumer returns policies on consignment contracts with inventory control

    DEFF Research Database (Denmark)

    Hu, W.; Li, Y.; Govindan, Kannan

    2014-01-01

    , and then the retailer sets her retail price for selling the product. The vendor gets paid based on net sold units and salvages unsold units as well as returned items in a secondary market. Under the framework, we study and compare two different consignment arrangements: the retailer/vendor manages consignment inventory...... (RMCI/VMCI) programs. To study the impact of return policy, we discuss a consignment contract without return policy as a benchmark. We show that whether or not the vendor offers a return policy, it is always beneficial for the channel to delegate the inventory decision to the vendor. We find...

  18. A comprehensive inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the INEL RWMC during the years 1984-2003, Volume 2

    International Nuclear Information System (INIS)

    1995-05-01

    This is the second volume of this comprehensive report of the inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the Idaho National Engineering Laboratory. Appendix B contains a complete printout of contaminant inventory and other information from the CIDRA Database and is presented in volumes 2 and 3 of the report

  19. METHODOLOGY AND ORGANIZATION OF ACCOUNTING AND INTERNAL CONTROL OF INVENTORIES OF THE COMPANY IN THE SYSTEM OF ASSET MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Koblyanska Olena

    2018-03-01

    Full Text Available Introduction. The article is devoted to theoretical, methodological and practical issues of accounting and internal control of the company’s stocks in the asset management system. The purpose of the study is to deepen and consolidate the theoretical and practical knowledge of the issues of accounting and internal control of the company’s stocks in the asset management system, identify practical problems with the implementation of the methodology and organization of accounting and internal control of the company’s stocks and develop recommendations for the elimination of deficiencies and improve the accounting and internal control of the company’s stocks. Results. The issue of relevance of proper accounting and internal control of stocks at the enterprise is considered. The research of typical operations with stocks was carried out with the use of the method of their reflection in the account. The classification of stocks, carrying out of their estimation, definition of the initial value, and also the typical correspondence from the account of stocks are resulted. A comparative characteristic of international and national inventory standards was implemented. The article deals with the features of the internal control of inventories at the enterprise, provides normative documents on its organization and methodology, describes the procedure for its implementation at the enterprise and identifies the typical mistakes that occur during its implementation. Conclusions. The questions about theoretical, methodological and practical issues of accounting and internal control of the company’s stocks in the asset management system were considered. A study of typical operations with stocks was carried out with the use of the method of their reflection in the accounts and the features of the internal control of inventories at the enterprise.

  20. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  1. Computational results for the control of a divergent N-echelon inventory system

    NARCIS (Netherlands)

    Diks, E.B.; Kok, de A.G.

    1996-01-01

    Consider a divergent multi-echelon inventory system, e.g., a distribution system or a production system. At every facility in the system orders are placed (or production is initiated) periodically. The order arrives after a fixed lead time. At the end of each period linear costs are incurred at each

  2. A sample-based method for perishable good inventory control with a service level constraint

    NARCIS (Netherlands)

    Hendrix, Eligius M.T.; Pauls-Worm, Karin G.J.; Rossi, Roberto; Alcoba, Alejandro G.; Haijema, Rene

    2015-01-01

    This paper studies the computation of so-called order-upto levels for a stochastic programming inventory problem of a perishable product. Finding a solution is a challenge as the problem enhances a perishable product, fixed ordering cost and non-stationary stochastic demand with a service level

  3. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  4. The Role of Hybrid Make-to-Stock (MTS) - Make-to-Order (MTO) and Economic Order Quantity (EOQ) Inventory Control Models in Food and Beverage Processing Industry

    Science.gov (United States)

    Najhan Mohd Nagib, Ahmad; Naufal Adnan, Ahmad; Ismail, Azianti; Halim, Nurul Hayati Abdul; Syuhadah Khusaini, Nurul

    2016-11-01

    The inventory model had been utilized since the early 1900s. The implementation of the inventory management model is generally to ensure that an organisation is able to fulfil customer's demand at the lowest possible cost to improve profitability. This paper focuses on reviewing previous published papers regarding inventory control model mainly in the food and beverage processing industry. The author discusses four inventory models, which are the make-to-stock (MTS), make-to-order (MTO), economic order quantity (EOQ), and hybrid of MTS-MTO models. The issues raised by the researchers on the above techniques as well as the elements need to be considered upon selection have been discussed in this paper. The main objective of the study is to highlight the important role played by these inventory control models in the food and beverage processing industry.

  5. VOCs emission characteristics and priority control analysis based on VOCs emission inventories and ozone formation potentials in Zhoushan

    Science.gov (United States)

    Wang, Qiaoli; Li, Sujing; Dong, Minli; Li, Wei; Gao, Xiang; Ye, Rongmin; Zhang, Dongxiao

    2018-06-01

    Zhoushan is an island city with booming tourism and service industry, but also has many developed VOCs and/or NOX emission industries. It is necessary to carry out regional VOCs and O3 pollution control in Zhoushan as the only new area owns the provincial economic and social administration rights. Anthropogenic VOCs emission inventories were built based on emission factor method and main emission sources were identified according to the emission inventories. Then, localized VOCs source profiles were built based on in-site sampling and referring to other studies. Furthermore, ozone formation potentials (OFPs) profiles were built through VOCs source profiles and maximum incremental reactivity (MIR) theory. At last, the priority control analysis results showed that industrial processes, especially surface coating, are the key of VOCs and O3 control. Alkanes were the most emitted group, accounting for 58.67%, while aromatics contributed the most to ozone production accounting for 69.97% in total OFPs. n-butane, m/p-xylene, i-pentane, n-decane, toluene, propane, n-undecane, o-xylene, methyl cyclohexane and ethyl benzene were the top 10 VOC species that should be preferentially controlled for VOCs emission control. However, m/p-xylene, o-xylene, ethylene, n-butane, toluene, propene, 1,2,4-trimethyl benzene, 1,3,5-trimethyl benzene, ethyl benzene and 1,2,3-trimethyl benzene were the top 10 VOC species that required preferential control for O3 pollution control.

  6. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  7. Application of particle swarm optimisation for solving deteriorating inventory model with fluctuating demand and controllable deterioration rate

    Science.gov (United States)

    Chen, Yu-Ren; Dye, Chung-Yuan

    2013-06-01

    In most of the inventory models in the literature, the deterioration rate of goods is viewed as an exogenous variable, which is not subject to control. In the real market, the retailer can reduce the deterioration rate of product by making effective capital investment in storehouse equipments. In this study, we formulate a deteriorating inventory model with time-varying demand by allowing preservation technology cost as a decision variable in conjunction with replacement policy. The objective is to find the optimal replenishment and preservation technology investment strategies while minimising the total cost over the planning horizon. For any given feasible replenishment scheme, we first prove that the optimal preservation technology investment strategy not only exists but is also unique. Then, a particle swarm optimisation is coded and used to solve the nonlinear programming problem by employing the properties derived from this article. Some numerical examples are used to illustrate the features of the proposed model.

  8. An inventory of innovative policies and measures for energy efficiency. Phase 1 of the EU SAVE 'White and Green' project

    International Nuclear Information System (INIS)

    Oikonomou, V.; Patel, M.

    2004-12-01

    be considered and also modern regulatory approaches. Much attention is paid in this report to the modern market instruments, which are based on the concept of trading, with the most prominent representative being the European Emissions Trading scheme. Other more recent market based instruments discussed in this report are the White and Green Certificates. Encompassing the above, this report intends to provide an overview of all major P+M for energy efficiency improvement. The P+M are categorized according to some parameters such as a general description of the measure, the sector applied, the mechanism at work, the countries where this measure has been designed and/or implemented and the stakeholders they involve during their implementation. Furthermore, a critical assessment of each measure follows according to some criteria, like effectiveness, efficiency and goal achievement. The underlying motivation for the preparation of such an inventory of P+M is to establish the grounds for a comparative assessment of measures as they are currently discussed and/or applied in the European Union. Four P+M will then be chosen which will be then analyzed in depth in Phase II of the 'White and Green' project. In this phase simulation models will be used to study the impact of various solutions on the cost of saving energy (particularly electricity and gas), the role that different technologies could play and their expected diffusion, etc. In the context outlined above, it is clearly of interest to assess the various solutions for market-oriented policy measures aimed at increasing the efficiency in the final uses of energy, to identify the best practices and to present, to the European Commission and to the Member states, indications on the potential advantages of using such practices in the promotion of a common energy policy objective

  9. The Federal Cylinder Project: A Guide to Field Cylinder Collections in Federal Agencies. Volume 1, Introduction and Inventory.

    Science.gov (United States)

    Brady, Erika; And Others

    Volume one of a multivolume catalog inventories 247 federal agency collections of wax cylinder recordings made by early ethnographers during 5 decades (1890-1941) of field work with Native American, traditional American, and world cultures. Native American music, chants, and linguistic samples comprise the majority of the collection. In addition…

  10. The Italian National Forest Inventory: geographical and positioning aspects in relation to the different phases of the project

    Science.gov (United States)

    Giacomo Colle; Antonio Floris; Gianfranco Scrinzi; Giovanni Tabacchi; Lorenzo Cavini

    2009-01-01

    In this article, we describe in depth the analysis and solutions to manage the multiple coordinates of the sampling objects coming from the three different phases of the second Italian national forest inventory (Inventario Nazionale delle Foreste e dei serbatoi forestali di Carbonio [INFC]). In particular, this article describes the criteria used to determine the...

  11. New Mexico Forest Inventory and Analysis: American Recovery and Reinvestment Act Project, Field Report: 2010-2012

    Science.gov (United States)

    Mary Stuever; John Capuano

    2014-01-01

    For a 3-year period, from 2010-2012, the New Mexico Forestry Division utilized contractors to collect Forest Inventory and Analysis (FIA) data in New Mexico. Funded through the American Recovery and Reinvestment Act, the State partnered with the Interior West FIA Program. Together, both agencies collected data on approximately 6,450 plots. This effort represents the...

  12. Plutonium and minor actinides management in the nuclear fuel cycle: assessing and controlling the inventory

    International Nuclear Information System (INIS)

    Mouney, H.

    2002-01-01

    The mastering of the plutonium and minor actinides inventory in the French Nuclear Cycle is based on a progressive approach from the present status, dealing with the partial reprocessing of spent fuels and the recycling of Pu in the MOX assemblies loaded in the 20 licensed PWRs. This strategy keeps the door open long-term, for example, for the eventual multi-recycling of excess Pu in dedicated new assemblies, such as APA or CORAIL in order to stabilize the Pu inventory in the fuel cycle or allow its utilization in new types of fast reactors. Presently, in the framework of 1991 law, scenario studies relying on present and/or innovative technologies are carried out in order to transmute both Pu and minor actinides, thus minimising the quantities to be for disposal. (author)

  13. Control of civilian plutonium inventories using burning in a non-fertile fuel

    Energy Technology Data Exchange (ETDEWEB)

    Oversby, V.M. [Lawrence Livermore National Lab., CA (United States); McPheeters, C.C. [Argonne National Laboratory, 9700 South Cass Avenue, Argonne, IL 60439-4837 (United States); Degueldre, C. [Paul Scherrer Institute, 5232 Villigen-PSI (Switzerland); Paratte, J.M. [Paul Scherrer Institute, 5232 Villigen-PSI (Switzerland)

    1997-05-01

    The increasing inventories of plutonium generated by commercial nuclear power production represent a potential source for proliferation of nuclear weapons. To address this threat we propose separating the plutonium from the other constituents of commercial reactor spent fuel and burning it in a non-fertile fuel based on a zirconium dioxide matrix. The separation can be performed by the Purex process currently in use, but we recommend development of a more compact separation technology that would produce less secondary waste than currently used technology and would allow for more stringent accounting of plutonium inventories. The non-fertile fuel is designed for use in conventional light water power reactors and does not require development of new reactor technology. (orig.).

  14. Control of civilian plutonium inventories using burning in a non-fertile fuel

    Science.gov (United States)

    Oversby, V. M.; McPheeters, C. C.; Degueldre, C.; Paratte, J. M.

    1997-05-01

    The increasing inventories of plutonium generated by commercial nuclear power production represent a potential source for proliferation of nuclear weapons. To address this threat we propose separating the plutonium from the other constituents of commercial reactor spent fuel and burning it in a non-fertile fuel based on a zirconium dioxide matrix. The separation can be performed by the Purex process currently in use, but we recommend development of a more compact separation technology that would produce less secondary waste than currently used technology and would allow for more stringent accounting of plutonium inventories. The non-fertile fuel is designed for use in conventional light water power reactors and does not require development of new reactor technology.

  15. A computerized system for control and management of radionuclide inventory: application in nuclear medicine

    International Nuclear Information System (INIS)

    Hoory, S.; Levy, I.M.; Moskowitz, G.; Bandyopadhyay, D.; Vaugeois, J.C.

    1982-01-01

    An interactive computerized system for radioisotope management and instantaneous inventory is reported. The system is capable of handling operations such as filing, nuclear imaging and disposing of various radionuclides. All radiopharmaceutical transactions are achieved with the aid of a Prime 300 mini-computer of 192K words of high speed semi-conductor memory and over 120 mega bytes of disk storage. The system automatically corrects for the appropriate decay, monitors and updates the storage file after every subsequent study. The performed study is recorded in a special file, together with the time and data retrieved from the computer's real time clock at the time of the entry. The system provides an organized and complete bookkeeping of all records concerning radionuclide transactions. It is found to be simple, efficient, highly versatile, and drastically reduces the time of operation and errors in handling the radioisotope inventory. (author)

  16. Evaluation of various fuel cycles to control inventories of plutonium and minor in advanced fuel cycles

    International Nuclear Information System (INIS)

    Miller, L.F.; Anderson, T.; Preston, J.; Humberstone, M.; Hou, J.; McConn, J.; Van Den Durpel, L.

    2007-01-01

    Inventories of Plutonium and minor actinides are important factors in determination of the risk associated with the use of nuclear energy. This includes the potential of exceeding release limits from a repository and the potential for proliferation. The amount of these materials in any given fleet of reactors is determined in large part by the choice of fuel cycle and by the types of reactors selected for operation. Most of the US reactor fleet will need to be replaced within the next 30 years and additional reactors will need to be added if the contribution of power from nuclear energy is expanded. In order to minimize risk and to make judicious use of repository space, inventories of all radionuclides will need to be effectively managed. Use of hard-spectrum reactors to burn excess Plutonium and other actinides is technologically feasible and is most likely less costly than any other options for minimizing various risks. Calculations for the inventories of several categories of radionuclides indicate that introduction of a modest fraction of fast reactors into the US reactor fleet is effective in stabilizing the growth of problematic radioisotopes. Results are obtained from the DANESS (Dynamic Analysis of Nuclear Energy System Strategies)1,2 Code and from the solution of algebraic equations that define steady state inventories. There are various different possible fuel cycle scenarios to utilize in the implementation of fast, thermal and intermediate spectrum reactors into the U.S. fleet. Results include various combinations of reactor types and fuel with varying times of implementations. Mass flows with uncertainties for equilibrium cycles will also be reported. Time-dependent scenarios are modeled with the DANESS code, and algebraic equations for various fuel cycles are derived. Uncertainties are obtained using Monte Carlo simulations based on estimates of parameters in the models. (authors)

  17. A time-based control policy for a perishable inventory system with lost sales

    OpenAIRE

    Tekin, Eylem

    1998-01-01

    Ankara : Department of Industrial Engineering and the Institute of Engineering and Science of Bilkent Univ., 1998. Thesis (Master's) -- Bilkent University, 1998. Includes bibliographical references leaves 49-52 In this study, we propose a new time-based poiicy for continuous review inventory systems where the products have fixed fife times and unmet denicinds are iost. We cierive the exact expressions of the key operating characteristics of the rnociei. Based on these perfo...

  18. Evaluation of various fuel cycles to control inventories of plutonium and minor in advanced fuel cycles

    Energy Technology Data Exchange (ETDEWEB)

    Miller, L.F.; Anderson, T.; Preston, J.; Humberstone, M.; Hou, J.; McConn, J. [Tennessee Univ., Nuclear Engineering Dept., Knoxville, TN (United States); Van Den Durpel, L. [Argonne National Laboratory, Argonne, IL (United States)

    2007-07-01

    Inventories of Plutonium and minor actinides are important factors in determination of the risk associated with the use of nuclear energy. This includes the potential of exceeding release limits from a repository and the potential for proliferation. The amount of these materials in any given fleet of reactors is determined in large part by the choice of fuel cycle and by the types of reactors selected for operation. Most of the US reactor fleet will need to be replaced within the next 30 years and additional reactors will need to be added if the contribution of power from nuclear energy is expanded. In order to minimize risk and to make judicious use of repository space, inventories of all radionuclides will need to be effectively managed. Use of hard-spectrum reactors to burn excess Plutonium and other actinides is technologically feasible and is most likely less costly than any other options for minimizing various risks. Calculations for the inventories of several categories of radionuclides indicate that introduction of a modest fraction of fast reactors into the US reactor fleet is effective in stabilizing the growth of problematic radioisotopes. Results are obtained from the DANESS (Dynamic Analysis of Nuclear Energy System Strategies)1,2 Code and from the solution of algebraic equations that define steady state inventories. There are various different possible fuel cycle scenarios to utilize in the implementation of fast, thermal and intermediate spectrum reactors into the U.S. fleet. Results include various combinations of reactor types and fuel with varying times of implementations. Mass flows with uncertainties for equilibrium cycles will also be reported. Time-dependent scenarios are modeled with the DANESS code, and algebraic equations for various fuel cycles are derived. Uncertainties are obtained using Monte Carlo simulations based on estimates of parameters in the models. (authors)

  19. A comprehensive inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the INEL RWMC during the years 1984-2003, Volume 1

    International Nuclear Information System (INIS)

    1995-05-01

    This report presents a comprehensive inventory of the radiological and nonradiological contaminants in waste buried or projected to be buried from 1984 through 2003 in the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) of the Idaho National Engineering Laboratory. The project to compile the inventory is referred to as the recent and projected data task. The inventory was compiled primarily for use in a baseline risk assessment under the Comprehensive Environmental Response, Compensation, and Liability Act. The compiled information may also be useful for environmental remediation activities that might be necessary at the RWMC. The information that was compiled has been entered into a database termed CIDRA-the Contaminant Inventory Database for Risk Assessment. The inventory information was organized according to waste generator and divided into waste streams for each generator. The inventory is based on waste information that was available in facility operating records, technical and programmatic reports, shipping records, and waste generator forecasts. Additional information was obtained by reviewing the plant operations that originally generated the waste, by interviewing personnel formerly employed as operators, and by performing nuclear physics and engineering calculations. In addition to contaminant inventories, information was compiled on the physical and chemical characteristics and the packaging of the 99 waste streams. The inventory information for waste projected to be buried at the SDA in the future was obtained from waste generator forecasts. The completeness of the contaminant inventories was confirmed by comparing them against inventories in previous reports and in other databases, and against the list of contaminants detected in environmental monitoring performed at the RWMC

  20. Adding Shareholder Value through Project Performance Measurement, Monitoring & Control

    NARCIS (Netherlands)

    M.M. Akalu; J.R. Turner (Rodney)

    2002-01-01

    textabstractWe present the various views and methods of measuring and controlling project performance, and factors affecting a project. The review indicates that there is a shift in the type and understanding of factors of project success or failure. However, the presence of various measurement

  1. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  2. QLab 3 show control projects for live performances & installations

    CERN Document Server

    Hopgood, Jeromy

    2013-01-01

    Used from Broadway to Britain's West End, QLab software is the tool of choice for many of the world's most prominent sound, projection, and integrated media designers. QLab 3 Show Control: Projects for Live Performances & Installations is a project-based book on QLab software covering sound, video, and show control. With information on both sound and video system basics and the more advanced functions of QLab such as MIDI show control, new OSC capabilities, networking, video effects, and microphone integration, each chapter's specific projects will allow you to learn the software's capabilitie

  3. 21 CFR 1304.11 - Inventory requirements.

    Science.gov (United States)

    2010-04-01

    ... the inventory of the registered location to which they are subject to control or to which the person... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Inventory requirements. 1304.11 Section 1304.11... REGISTRANTS Inventory Requirements § 1304.11 Inventory requirements. (a) General requirements. Each inventory...

  4. Inventory of existing heat pump projects and the use of solar energy for heat pumps in the Dutch house construction sector

    International Nuclear Information System (INIS)

    1997-01-01

    The aim of the title inventory is to learn from the experiences with heat pump projects in the Netherlands. Descriptions are given of practical experiences with heat pump applications in the last 15 years in the housing sector. Possible and feasible heat pump system concepts are analyzed and energy balances and energy consumption are calculated. Special attention is paid to the use of solar energy in combination with electric (compression) heat pumps. One of the most important bottlenecks is the method and availability of heat extraction: the choice for the different options is determined by investment costs, permission, regulations, and local conditions. 14 refs., 4 appendices

  5. Eating Disorder Inventory-3, validation in Swedish patients with eating disorders, psychiatric outpatients and a normal control sample.

    Science.gov (United States)

    Nyman-Carlsson, Erika; Engström, Ingemar; Norring, Claes; Nevonen, Lauri

    2015-02-01

    The Eating Disorder Inventory-3 (EDI-3) is designed to assess eating disorder psychopathology and the associated psychological symptoms. The instrument has been revised and has not yet been validated for Swedish conditions in its current form. The aim of this study was to investigate the validity and reliability of this inventory and present national norms for Swedish females. Data from patients with eating disorders (n = 292), psychiatric outpatients (n = 140) and normal controls (n = 648), all females, were used to study the internal consistency, the discriminative ability, and the sensitivity and specificity of the inventory using preliminary cut-offs for each subscale and diagnosis separately. Swedish norms were compared with those from Denmark, USA, Canada, Europe and Australian samples. The reliability was acceptable for all subscales except Asceticism among normal controls. Analysis of variance showed that the EDI-3 discriminates significantly between eating disorders and normal controls. Anorexia nervosa was significantly discriminated from bulimia nervosa and eating disorder not otherwise specified on the Eating Disorder Risk Scales. Swedish patients scored significantly lower than patients from other countries on the majority of the subscales. Drive for Thinness is the second best predictor for an eating disorder. The best predictor for anorexia nervosa was Interoceptive Deficits and Bulimia for the other diagnoses. Conclusions/clinical implications: The EDI-3 is valid for use with Swedish patients as a clinical assessment tool for the treatment planning and evaluation of patients with eating-related problems. However, it still exist some uncertainty regarding its use as a screening tool.

  6. Methane and nitrous oxide: Methods in national emissions inventories and options for control

    Energy Technology Data Exchange (ETDEWEB)

    Van Amstel, A.R. (ed.)

    1993-07-01

    The UN Framework Convention on Climate Change signed in Rio de Janeiro, Brazil, calls for the return of anthropogenic emissions of greenhouse gases to their 1990 levels by the year 2000 in industrialized countries. It also calls for a monitoring of the emissions of greenhouse gases. It is important that reliable and scientifically credible national inventories are available for the international negotiations. Therefore a consistent methodology and a transparent reporting format is needed. The title workshop had two main objectives: (1) to support the development a methodology and format for national emissions inventories of greenhouse gases by mid 1993, as coordinated by the Science Working Group of the IPCC and the OECD; and (2) the development of technical options for reduction of greenhouse gases and the assessment of the socio-economic feasibility of these options. The workshop consisted of key note overview presentations, and two rounds of working group sessions, each covering five parallel sessions on selected sources. In the first round of each working group session the literature, existing methods for methane and nitrous oxide inventories, and the OECD/IPCC guidelines have been addressed. Then, in the second round, options for emission reductions have been discussed, as well as their socio-economic implications. The methane sources discussed concern oil and gas, coal mining, ruminants, animal waste, landfills and sewage treatment, combustion and industry, rice production and wetlands, biomass burning. The nitrous oxide sources discussed are agricultural soils and combustion and industry. The proceedings on methane comprise 16 introductory papers and 7 papers on the results of the working groups, while in part two four introductory papers and two papers on the results of working groups on nitrous oxide are presented. In part three future emission reduction policy options are discussed. Finally, 16 poster contributions are included

  7. Analysis of forecasting and inventory control of raw material supplies in PT INDAC INT’L

    Science.gov (United States)

    Lesmana, E.; Subartini, B.; Riaman; Jabar, D. A.

    2018-03-01

    This study discusses the data forecasting sales of carbon electrodes at PT. INDAC INT L uses winters and double moving average methods, while for predicting the amount of inventory and cost required in ordering raw material of carbon electrode next period using Economic Order Quantity (EOQ) model. The result of error analysis shows that winters method for next period gives result of MAE, MSE, and MAPE, the winters method is a better forecasting method for forecasting sales of carbon electrode products. So that PT. INDAC INT L is advised to provide products that will be sold following the sales amount by the winters method.

  8. Reactivity-based industrial volatile organic compounds emission inventory and its implications for ozone control strategies in China

    Science.gov (United States)

    Liang, Xiaoming; Chen, Xiaofang; Zhang, Jiani; Shi, Tianli; Sun, Xibo; Fan, Liya; Wang, Liming; Ye, Daiqi

    2017-08-01

    Increasingly serious ozone (O3) pollution, along with decreasing NOx emission, is creating a big challenge in the control of volatile organic compounds (VOCs) in China. More efficient and effective measures are assuredly needed for controlling VOCs. In this study, a reactivity-based industrial VOCs emission inventory was established in China based on the concept of ozone formation potential (OFP). Key VOCs species, major VOCs sources, and dominant regions with high reactivity were identified. Our results show that the top 15 OFP-based species, including m/p-xylene, toluene, propene, o-xylene, and ethyl benzene, contribute 69% of the total OFP but only 30% of the total emission. The architectural decoration industry, oil refinery industry, storage and transport, and seven other sources constituted the top 10 OFP subsectors, together contributing a total of 85%. The provincial and spatial characteristics of OFP are generally consistent with those of mass-based inventory. The implications for O3 control strategies in China are discussed. We propose a reactivity-based national definition of VOCs and low-reactive substitution strategies, combined with evaluations of health risks. Priority should be given to the top 15 or more species with high reactivity through their major emission sources. Reactivity-based policies should be flexibly applied for O3 mitigation based on the sensitivity of O3 formation conditions.

  9. Successful Control of Major Project Budgets

    Directory of Open Access Journals (Sweden)

    Steen Lichtenberg

    2016-07-01

    Full Text Available This paper differs from scientific papers describing current research. In line with the theme of this special issue, it challenges conventional risk management practice against the background of former research results successfully finished decades ago. It is well-known that conventional practice frequently results in budget overruns of large projects. International reviews document that. Severe delays of schedules are also well-known. This paper describes successful research results from almost three decades ago, which successfully challenges this severe problem and has led to new practices. The research involved is an unusual mix: Scandinavian researchers from psychology, statistical theory and engineering economy. The resulting procedure has been widely used since around 1990 and challenges conventional procedures. The procedure is documented to be able to yield statistically correct prognoses, when the “rules of the game” have been correctly followed. After a short summary of the basic situation, this paper summarizes the research, followed by some resulting experiences, focusing on two recent studies each of 40 infrastructures and other major projects. In both sets, the actual final cost largely equaled the expected project cost. This result is a marked change from international past and present experience. Finally, the need for further research and progress is discussed.

  10. Clinical Decision Support (CDS) Inventory

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Clinical Decision Support (CDS) Inventory contains descriptions of past and present CDS projects across the Federal Government. It includes Federal projects,...

  11. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  12. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  13. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  14. Joint Optimization of Star P-hub Median Problem and Seat Inventory Control Decisions Considering a Hybrid Routing Transportation System

    Directory of Open Access Journals (Sweden)

    Hamid Tikani

    2016-11-01

    Full Text Available In this paper, we study the problem of integrated capacitated hub location problem and seat inventory control considering concept and techniques of revenue management. We consider an airline company maximizes its revenue by utilizing the best network topology and providing proper booking limits for all itineraries and fare classes. The transportation system arises in the form of a star/star network and includes both hub-stop and non-stop flights. This problem is formulated as a two-stage stochastic integer program with mixed-integer recourse. We solve various instances carried out from the Turkish network data set. Due to the NP-hardness of the problem, we propose a hybrid optimization method, consisting of an evolutionary algorithm based on genetic algorithm and exact solution. The quality of the solutions found by the proposed meta-heuristic is compared with the original version of GA and the mathematical programming model. The results obtained by the proposed model imply that integrating hub location and seat inventory control problem would help to increase the total revenue of airline companies. Also, in the case of serving non-stop flights, the model can provide more profit by employing less number of hubs.

  15. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  16. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  17. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  18. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Dr. Scott Staley

    2010-03-31

    This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to

  19. Dust control at Yucca Mountain project

    International Nuclear Information System (INIS)

    Kissell, F.; Jurani, R.; Dresel, R.; Reaux, C.

    1999-01-01

    This report describes actions taken to control silica dust at the Yucca Mountain Exploratory Studies Facility, a tunnel located in Southern Nevada that is part of a scientific program to determine site suitability for a potential nuclear waste repository. The rock is a volcanic tuff containing significant percentages of both quartz and cristobalite. Water use for dust control was limited because of scientific test requirements, and this limitation made dust control a difficult task. Results are reported for two drifts, called the Main Loop Drift and the Cross Drift. In the Main Loop Drift, dust surveys and tracer gas tests indicated that air leakage from the TBM head, the primary ventilation duct, and movement of the conveyor belt were all significant sources of dust. Conventional dust control approaches yielded no significant reductions in dust levels. A novel alternative was to install an air cleaning station on a rear deck of the TBM trailing gear. It filtered dust from the contaminated intake air and discharged clean air towards the front of the TBM. The practical effect was to produce dust levels below the exposure limit for all TBM locations except close to the head. In the Cross Drift, better ventilation and an extra set of dust seals on the TBM served to cut down the leakage of dust from the TBM cutter head. However, the conveyor belt was much dustier than the belt in the main loop drift. The problem originated with dirt on the bottom of the belt return side and much spillage from the belt top side. Achieving lower dust levels in hard rock tunneling operations will require new approaches as well as a more meticulous application of existing technology. Planning for dust control will require specific means to deal with dust that leaks from the TBM head, dust that originates with leaky ventilation systems, and dust that comes from conveyor belts. Also, the application of water could be more efficient if automatic controls were used to adjust the water flow

  20. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  1. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    Science.gov (United States)

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  2. Metrics-based control in outsourced software development projects

    NARCIS (Netherlands)

    Ponisio, Laura; van Eck, Pascal

    2012-01-01

    Measurements have been recognised as vital instruments to improve control in outsourced software development projects. However, project managers are still struggling with the design and implementation of effective measurement programs. One reason for this is that although there is a large body of

  3. Development of A Web-Based Information System for Material Inventory Control: The Case of An Automotive Company

    Directory of Open Access Journals (Sweden)

    Renjana Setyoandara Wibisono

    2016-10-01

    Full Text Available Inventory control is controlling the materials movement to fulfill the requirements. The materials can from the direct and indirect materials. the indirect materials are the materials that cannot be calculated according to the bill of materials. Indirect materials need safety stocks, so the requirements can always be fulfilled, means it need the control and monitoring of their levels. To control the movement of the materials, each department have roles to control and information that need to be shared. PT XYZ is an automotive assembler company, the company need a tool to control the indirect materials inbound and outbound and control its stock. This research is to have the tool that will be a web-based program because to share the information throughout the department of planning, production, and logistics. In developing and implementing the program itself, the RUP methodology is used to guide in doing this research with having four phases and activities that support the research. The result is the program itself have been successful to fulfilled the user requirements. The program shows the real time information for the levels of the materials and also the inbound and outbound of the materials for the user to monitor its levels.

  4. Controls and automation in the SPIRAL project

    International Nuclear Information System (INIS)

    Bothner, U.; Boulot, A.; Maherault, J.; Martial, L.

    1999-01-01

    The control and automation team of the R and D of Accelerator-Exotic Beam Department has had in the framework of SPIRAL collaboration the following tasks: 1. automation of the resonator high frequency equipment of the CIME cyclotron; 2. automation of the vacuum equipment, i.e. the low energy line (TBE), the CIME cyclotron, the low energy line (BE); 3. automation of load safety for power supply; 4. for each of these tasks a circuitry file based on the SCHEMA software has been worked out. The programs required in the automation of load safety for power supply (STEP5, PROTOOL, DESIGNER 4.1) were developed and implemented for PC

  5. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Science.gov (United States)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  6. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  7. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  8. Guidance and Control Software Project Data - Volume 3: Verification Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

  9. Development of inventory database for radioisotopes and radiation generators

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Du Hui; Oh, Jin Seon; Park, Chan Geol [Green and Global RADCON Co., LTD, Taejon (Korea, Republic of)

    2000-03-15

    This project is part of the other project, building of unified information network for radiation safety regulation that national computerization agency backs up. Main objectives of this project are inventory data collection, searching for the point at issue, analysis into the issue and collection of partially initial data. The scope of this study consists of : analysis into the previous collected data, making up the investigation table, sending the table to users and gathering data, drawing up the data management plan, making up the system of national inventory control system and procedure.

  10. Controlled Environmental Agriculture and Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Chris [Morrisville State College, NY (United States)

    2012-07-27

    Task A: Heating Plant - To design/build a Heating Plant Building with associated heating components for heating the greenhouse and to house the biomass gasification system. The subtasks for this task was and Engineering Design, Procurement and Construction activities. Overall milestones for this task were one construction permit, a code review and stamped drawings, engineered building vendor supplied sealed drawings, and the actual erection of a 1250 sq.ft. building. Task B: Heating System - The activities for this task included the procurement of the heating boilers and all ancillary components. This also included the installation of all heating system components in the new building plus the existing greenhouse structure. The milestone for this task was for the ability to heat 2500 gallons of water to 80 degrees F. Task C: Organic Matter Automated Hopper - The activities involved in this task involved design/fabrication of an automated hopper to feed the biomass gasification system. We need to procure materials and the automated motion components, have the system installed and factory acceptance test of the system. The milestone is to be able to feed wood chips at a rate of 20 Kg/Hr. Task D: Imbert Gasification System - The activities involved in this include the design/build of the gasifier with all accompany ductwork, cyclones and feeding system. Also there is a modification to the scrubber assembly with an automated ash removal system. Lastly a modification to the exhaust/flair system is made to capture heat from this component. Milestone for this task was to be able to produce 15 CFM of SynGas. Task E: Generator Powered by SynGas - Procure two 20kW 4 pole generator heads for installation on the gasifier system. Modification of the fuel plenum manifold with adjustment to the fuel curves for maximum power and load points. Milestone for this task is the ability to run two fuels, either SynGas or propane. This continues with the following tasks: Controls Heating

  11. A Projection of Automated Book Production Control

    Directory of Open Access Journals (Sweden)

    Mario Barisic

    2006-12-01

    Full Text Available The paper elaborates on the recommendation of systematic introducing of XML technologies as a standard and integral factor in publishing and graphic business activities and as a further improvement of the existing PostScript graphic production platform. Procedures are proposed for applying norm setting in respect to production processes through related connections organized databases under XML technology in a hierarchical way, as well as a book production norm setting system. The proposal for work processes automation in the domain of printing business control is elaborated under the CIP4-JDF automating system. Operation results are used as guidelines for setting the elements of automated business operations in the book production domain, with integrated elements of new technologies, compatible with global trends.

  12. Pricing and Inventory Control Strategy for a Periodic-Review Energy Buy-Back System

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jihong; CHEN Hongqiao; DING Xiaosong; LI Xian

    2016-01-01

    Along with the rapid development of economics and enhancement of industrialization,the power demand keeps rising and frequently creates mismatch between demand and supply in electricity.This provides miscellaneous energy buy-back programs with great opportunities.Such programs,when activated,offer certain amount of financial compensations to participants for reducing their energy consumption during peak time.They aim at encouraging participants to shift their electricity usage from peak to non-peak time,and thereby release the demand pressure during peak time.This paper considers a periodic-review joint pricing and inventory decision model under an energy buy-back program over finite planning horizons,in which the compensation levels,setup cost and additive random demand function are incorporated.The objective is to maximize a manufacturer's expected total profit.By using Veinott's conditions,it is shown that the manufacturer's optimal decision is a state dependent (s,S,P) policy under a peak market condition,or partly an (s,S,A,P) policy under the normal market condition.

  13. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  14. Control system of the MACSE project

    International Nuclear Information System (INIS)

    Gournay, J.F.; Gougnaud, F.; Matichard, G.; Azoulay, R.; Bouillac, A.

    1991-01-01

    With the goal of investigating all the technological aspects of superconducting RF acceleration, the so-called MACSE facility was put in operation at the end of 1990. The control system is built with several VME crates linked together with a dedicated Ethernet network. VxWorks is the real-time operating system used. A set of software services was built on top of VxWorks (high level communication tools, a data-base management system, a library of VME boards drivers and a limited man-machine interface). A complete range of application programs have been developed with these tools in order to fulfill the requirements of such a facility (settings of the parameters, surveillance, archive facility, closed loops...). The TCP-IP protocols family is extensively used for communications between the components of the system (UDP, RPC, rcmd, NFS). The development environment is based on the host-target approach through the use of a network of Sun 3/80 workstations. After 1 1/2 year of experience, this system has proven to be powerful and flexible [fr

  15. Inventory parameters

    CERN Document Server

    Sharma, Sanjay

    2017-01-01

    This book provides a detailed overview of various parameters/factors involved in inventory analysis. It especially focuses on the assessment and modeling of basic inventory parameters, namely demand, procurement cost, cycle time, ordering cost, inventory carrying cost, inventory stock, stock out level, and stock out cost. In the context of economic lot size, it provides equations related to the optimum values. It also discusses why the optimum lot size and optimum total relevant cost are considered to be key decision variables, and uses numerous examples to explain each of these inventory parameters separately. Lastly, it provides detailed information on parameter estimation for different sectors/products. Written in a simple and lucid style, it offers a valuable resource for a broad readership, especially Master of Business Administration (MBA) students.

  16. Computational procedure of optimal inventory model involving controllable backorder rate and variable lead time with defective units

    Science.gov (United States)

    Lee, Wen-Chuan; Wu, Jong-Wuu; Tsou, Hsin-Hui; Lei, Chia-Ling

    2012-10-01

    This article considers that the number of defective units in an arrival order is a binominal random variable. We derive a modified mixture inventory model with backorders and lost sales, in which the order quantity and lead time are decision variables. In our studies, we also assume that the backorder rate is dependent on the length of lead time through the amount of shortages and let the backorder rate be a control variable. In addition, we assume that the lead time demand follows a mixture of normal distributions, and then relax the assumption about the form of the mixture of distribution functions of the lead time demand and apply the minimax distribution free procedure to solve the problem. Furthermore, we develop an algorithm procedure to obtain the optimal ordering strategy for each case. Finally, three numerical examples are also given to illustrate the results.

  17. Integrated vendor-buyer inventory models with inflation and time value of money in controllable lead time

    Directory of Open Access Journals (Sweden)

    Prashant Jindal

    2016-01-01

    Full Text Available In the global critical economic scenario, inflation plays a vital role in deciding optimal pricing of goods in any business entity. This article presents two single-vendor single-buyer integrated supply chain inventory models with inflation and time value of money. Shortage is allowed during the lead-time and it is partially backlogged. Lead time is controllable and can be reduced using crashing cost. In the first model, we consider the demand of lead time follows a normal distribution, and in the second model, it is considered distribution-free. For both cases, our objective is to minimize the integrated system cost by simultaneously optimizing the order quantity, safety factor, lead time and number of lots. The discounted cash flow and classical optimization technique are used to derive the optimal solution for both cases. Numerical examples including the sensitivity analysis of system parameters is provided to validate the results of the supply chain models.

  18. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  19. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  20. Analysis and control of issues that delay pharmaceutical projects

    Directory of Open Access Journals (Sweden)

    Nallam Sai Nandeswara Rao

    2015-10-01

    Full Text Available Every project will have certain objectives and service levels to be achieved. The success of a project depends on several dimensions like time, cost/budget, quality, etc. and managing a project involves completing the project within time, within budget and with quality to satisfy the users. Because of the significance of health, pharmaceutical companies realized the importance of project management methods and techniques to make available the life saving drugs in time to the needy patients and hospitals. In literature, there is meager information about pharmaceutical project management oriented towards analysis of issues and factors that contribute to the failure or success of projects. This study attempts to analyse different issues that contribute to time delays in pharmaceutical product-based projects, group them under a finite set of prominent factors and identify remedial measures to control those delays. The feedback of project people of some big pharmaceutical firms of Indian sub-continent was collected for this purpose. Exploratory factor analysis (EFA has been used to reduce the reasons for time delays to a limited number of prominent factors and the EFA model has been further examined by confirmatory factor analysis (CFA for its validation. Remedial measures under each factor of time delays have been gathered and a framework designed to mitigate the time delays in pharmaceutical projects. The derived factors that delay the pharmaceutical projects include resource, monitoring & control, scheduling and planning problems. Important remedial measures like blended resource approach, estimation and forecast of shortage of labour and skills, regular quality training, etc. have been recommended.

  1. A comparison between the order and the volume fill rates for a base-stock inventory control system under a compound renewal demand process

    DEFF Research Database (Denmark)

    Larsen, Christian; Thorstenson, Anders

    The order fill rate is less commonly used than the volume fill rate (most often just denoted fill rate) as a performance measure for inventory control systems. However, in settings where the focus is on filling customer orders rather than total quantities, the order fill rate should be the prefer......The order fill rate is less commonly used than the volume fill rate (most often just denoted fill rate) as a performance measure for inventory control systems. However, in settings where the focus is on filling customer orders rather than total quantities, the order fill rate should...

  2. A new approach for controlling a hybrid stochastic manufacturing / remanufacturing system with inventories and different leadtimes

    NARCIS (Netherlands)

    Kiesmüller, G.P.

    2003-01-01

    This paper addresses the control problem of a stochastic recovery system with two stocking points and different leadtimes for production and remanufacturing. For such systems the optimal control policy for a linear cost model is not known. Therefore, in the literature several heuristic policies are

  3. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  4. F-15 837 IFCS Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John T.

    2007-01-01

    This viewgraph presentation reviews the use of Intelligent Flight Control System (IFCS) for the F-15. The goals of the project are: (1) Demonstrate Revolutionary Control Approaches that can Efficiently Optimize Aircraft Performance in both Normal and Failure Conditions (2) Advance Neural Network-Based Flight Control Technology for New Aerospace Systems Designs. The motivation for the development are to reduce the chance and skill required for survival.

  5. Project CAPTURE: using forest inventory and analysis data to prioritize tree species for conservation, management, and restoration

    Science.gov (United States)

    Kevin M. Potter; Barbara S. Crane; William W. Hargrove

    2015-01-01

    A variety of threats, most importantly climate change and insect and disease infestation, will increase the likelihood that forest tree species could experience population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort...

  6. Calculating Optimal Inventory Size

    Directory of Open Access Journals (Sweden)

    Ruby Perez

    2010-01-01

    Full Text Available The purpose of the project is to find the optimal value for the Economic Order Quantity Model and then use a lean manufacturing Kanban equation to find a numeric value that will minimize the total cost and the inventory size.

  7. Project-Based Learning in Programmable Logic Controller

    Science.gov (United States)

    Seke, F. R.; Sumilat, J. M.; Kembuan, D. R. E.; Kewas, J. C.; Muchtar, H.; Ibrahim, N.

    2018-02-01

    Project-based learning is a learning method that uses project activities as the core of learning and requires student creativity in completing the project. The aims of this study is to investigate the influence of project-based learning methods on students with a high level of creativity in learning the Programmable Logic Controller (PLC). This study used experimental methods with experimental class and control class consisting of 24 students, with 12 students of high creativity and 12 students of low creativity. The application of project-based learning methods into the PLC courses combined with the level of student creativity enables the students to be directly involved in the work of the PLC project which gives them experience in utilizing PLCs for the benefit of the industry. Therefore, it’s concluded that project-based learning method is one of the superior learning methods to apply on highly creative students to PLC courses. This method can be used as an effort to improve student learning outcomes and student creativity as well as to educate prospective teachers to become reliable educators in theory and practice which will be tasked to create qualified human resources candidates in order to meet future industry needs.

  8. Screening Air Traffic Control Specialists for Psychopathology Using the Minnesota Multiphasic Personality Inventory-2

    National Research Council Canada - National Science Library

    King, Raymond E; Schroeder, David J; Manning, Carol A; Retzlaff, Paul D; Williams, Clara A

    2008-01-01

    ...) as a psychological screening tool for conditionally selected FAA Air Traffic Control Specialists (ATCSs). A sample of 1,014 ATCSs in training voluntarily completed the MMPI-2 as part of a research program...

  9. Riparian Inventory

    Data.gov (United States)

    Kansas Data Access and Support Center — This dataset is a digital representation of the 1:24,000 Land Use Riparian Areas Inventory for the state of Kansas. The dataset includes a 100 foot buffer around all...

  10. Inventory development for perfluorooctane sulfonic acid (PFOS) in Turkey: challenges to control chemicals in articles and products.

    Science.gov (United States)

    Korucu, M Kemal; Gedik, Kadir; Weber, Roland; Karademir, Aykan; Kurt-Karakus, Perihan Binnur

    2015-10-01

    Perfluorooctane sulfonic acid (PFOS) and related substances have been listed as persistent organic pollutants (POPs) in the Stockholm Convention. Countries which have ratified the Convention need to take appropriate actions to control PFOS use and release. This study compiles and enhances the findings of the first inventory of PFOS and related substances use in Turkey conducted within the frame of the Stockholm Convention National Implementation Plan (NIP) update. The specific Harmonized Commodity Description and Coding System (Harmonized System (HS)) codes of imported and exported goods that possibly contain PFOS and 165 of Chemical Abstracts Service (CAS) numbers of PFOS-related substances were assessed for acquiring information from customs and other authorities. However, with the current approaches available, no useful information could be compiled since HS codes are not specific enough and CAS numbers are not used by customs. Furthermore, the cut-off volume in chemical databases in Turkey and the reporting limit in the HS system (0.1 %) are too high for controlling PFOS. The attempt of modeling imported volumes by a Monte Carlo simulation did not also result in a satisfactory estimate, giving an upper-bound estimate above the global production volumes. The replies to questionnaires were not satisfactory, highlighting that an elaborated approach is needed in the communication with potentially PFOS-using stakeholders. The experience of the challenges of gathering information on PFOS in articles and products revealed the gaps of controlling highly hazardous substances in products and articles and the need of improvements.

  11. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  12. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state

  13. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  14. Heuristics for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse

    NARCIS (Netherlands)

    Topan, E.; Bayindir, Z.P.; Tan, T.

    2010-01-01

    We consider a multi-item two-echelon inventory system in which the central warehouse operates under a (Q;R) policy, and each local warehouse implements (S ¡ 1; S) policy. The objective is to find the policy parameters minimizing expected system-wide inventory holding and fixed ordering costs subject

  15. Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures

    NARCIS (Netherlands)

    Topan, E.; Bayindir, Z.P.; Tan, T.

    2017-01-01

    We consider a multi-item two-echelon spare parts inventory system in which the central warehouse operates under a (Q, R) policy and local warehouses implement (S−1,S) policy. The objective is to find the policy parameters minimizing expected system-wide inventory holding and fixed ordering subject

  16. The U.S. Air Force Academy Lacked Effective Controls Over Heritage Assets and Guest House Inventories, and Inappropriately Solicited and Accepted Monetary Gifts

    Science.gov (United States)

    2013-09-23

    Inventories, and Inappropriately Solicited and Accepted Monetary Gifts Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden...Accepted Monetary Gifts 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...Monetary Gifts Objective We determined whether the U.S. Air Force Academy (USAFA), its nonappropriated fund instrumentalities (NAFIs), and its supporting

  17. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  18. [Case control trial on putative factors antagonising the successful project course of MD thesis projects].

    Science.gov (United States)

    Scharfenberg, J; Schaper, K; Krummenauer, F

    2015-05-01

    Award of the degree MD has special relevance in Germany since the underlying research project can be started during the qualification for admission to doctoral training. This leads to a large number of thesis projects with a not always sufficiently pronounced enthusiasm and thus poor chances of success. Accordingly a case control study was undertaken in the Department of Human Medicine, Witten/Herdecke University to investigate reported drop-outs of thesis projects. In autumn 2012 all students in the clinical phases of human medicine education were surveyed using a self-conceived questionnaire on previously initiated or terminated thesis projects, "terminated" is defined as the unsuccessful ending of a project after working for at least 3 months. Individually reported thesis terminations were evaluated using defined items in a 4-stage Likert scale regarding thesis plan and project, subsequently, graduate students who successfully completed a project received the same questionnaire. The items possibly corresponding to process determinants were averaged to a total of 7 dimensions prior to the analysis; the resulting scores were normalised in value ranges 0.0 to 1.0 (1.0 = optimal project situation) whereby individual items could be included in several scores. By means of 5 items a primary endpoint from the faculty's perspective on "compliance with formal procedures" was aggregated; by means of a two-sided Wilcoxon test at the 5 % level students with unsuccessful and successful courses were compared along the corresponding scores. 181 of 276 students from 7 study semesters participated in the screening; details of 17 terminations and 23 currently successful courses could be evaluated in the case control study. For significant differences (p thesis projects to the responsible committees. A weakness is the low number of evaluable self-reported drop-outs as well as the overall moderate response rate. Georg Thieme Verlag KG Stuttgart · New York.

  19. Computation of order and volume fill rates for a base stock inventory control system with heterogeneous demand to investigate which customer class gets the best service

    DEFF Research Database (Denmark)

    Larsen, Christian

    We consider a base stock inventory control system serving two customer classes whose demands are generated by two independent compound renewal processes. We show how to derive order and volume fill rates of each class. Based on assumptions about first order stochastic dominance we prove when one...

  20. A comparison between the order and the volume fill rate for a base-stock inventory control system under a compound renewal demand process

    DEFF Research Database (Denmark)

    Larsen, Christian; Thorstenson, Anders

    2008-01-01

    The order fill rate (OFR) is sometimes suggested as an alternative to the volume fill rate (VFR) (most often just denoted fill rate) as a performance measure for inventory control systems. We consider a continuous review, base-stock policy, where replenishment orders have a constant lead time...

  1. Halden Reactor Project Workshop: Understanding Advanced Instrumentation and Controls Issues

    International Nuclear Information System (INIS)

    Beltracchi, L.

    1991-01-01

    A Halden Reactor Project Workshop on 'Understanding Advanced Instrumentation and Controls Issues' was held in Halden, Norway, during June 17-18, 1991. The objectives of the workshop were to (1) identify and prioritize the types of technical information that the Halden Project can produce to facilitate the development of man-machine interface guidelines and (2) to identify methods to effectively integrate and disseminate this information to signatory organizations. As a member of the Halden Reactor Project, the Nuclear Regulatory Commission (NRC) requested the workshop. This request resulted from the NRC's need for human factors guidelines for the evaluation of advanced instrumentation and controls. The Halden Reactor Project is a cooperative agreement among several countries belonging to the Organization for Economic Cooperation and Development (OECD). The US began its association with the Halden Project in 1958 through the Atomic Energy Commission. The project's activities are centered at the Halden heavy-water reactor and its associated man-machine laboratory in Halden, Norway. The research program conducted at Halden consists of studies on fuel performance and computer-based man-machine interfaces

  2. Travel reliability inventory for Chicago.

    Science.gov (United States)

    2013-04-01

    The overarching goal of this research project is to enable state DOTs to document and monitor the reliability performance : of their highway networks. To this end, a computer tool, TRIC, was developed to produce travel reliability inventories from : ...

  3. Comparison of the availability of groundwater information sources in Poland with other European countries. Knowledge inventory for hydrogeology research - project KINDRA

    Science.gov (United States)

    Tomaszewska, Barbara; Dendys, Marta; Tyszer, Magdalena

    2017-11-01

    Regulations of the Water Framework Directive 200/60/EC (WFD) had been applied by European Union countries into their legislation system. However, it does not guarantee that the groundwater research has the same standard and quality in EU countries. KINDRA international research project was launched to assessment of existing groundwater-related practical and scientific knowledge based on a new Hydrogeological Research Classification System (HRC-SYS). This classification is supported by a web-service - the European Inventory of Groundwater Research (EIGR). The main goal of the project is implementation policy of optimization in groundwater research in EU. The preliminary result of survey about groundwater management shows that in Poland is a good state of implementation WFD. Good level of implementation is especially related with groundwater monitoring. It is because a lot of institutions and municipal entities carry out their tasks referring to quality or quantity assessment. Results of their works are published as reports, newsletters, maps, bulletins etc. These materials are potential source of information which can be a valuable contribution to EIGR. However, a lot of information are published only in polish language, so it is impossible to spread this knowledge in Europe.

  4. Comparison of the availability of groundwater information sources in Poland with other European countries. Knowledge inventory for hydrogeology research – project KINDRA

    Directory of Open Access Journals (Sweden)

    Tomaszewska Barbara

    2017-01-01

    Full Text Available Regulations of the Water Framework Directive 200/60/EC (WFD had been applied by European Union countries into their legislation system. However, it does not guarantee that the groundwater research has the same standard and quality in EU countries. KINDRA international research project was launched to assessment of existing groundwater-related practical and scientific knowledge based on a new Hydrogeological Research Classification System (HRC-SYS. This classification is supported by a web-service – the European Inventory of Groundwater Research (EIGR. The main goal of the project is implementation policy of optimization in groundwater research in EU. The preliminary result of survey about groundwater management shows that in Poland is a good state of implementation WFD. Good level of implementation is especially related with groundwater monitoring. It is because a lot of institutions and municipal entities carry out their tasks referring to quality or quantity assessment. Results of their works are published as reports, newsletters, maps, bulletins etc. These materials are potential source of information which can be a valuable contribution to EIGR. However, a lot of information are published only in polish language, so it is impossible to spread this knowledge in Europe.

  5. Personality trait interactions in parents of patients with borderline personality disorder: a controlled study using the Temperament and Character Inventory.

    Science.gov (United States)

    Fassino, Secondo; Amianto, Federico; Gastaldi, Filippo; Abbate-Daga, Giovanni; Brambilla, Francesca; Leombruni, Paolo

    2009-01-30

    Family environment is a pathogenic factor of borderline personality disorder (BPD). However, the personality traits of patients with BPD and their parents have never been assessed using the same instrument and then examined for relationships. In the present study, we explored the temperament and character traits of BPD patients and their parents to investigate possible interactions. In total, 56 patients with BPD and their parents were evaluated with the Temperament and Character Inventory (TCI) and compared with 53 control families. Discriminant and correlation analyses indicated that subjects with BPD displayed higher levels of novelty seeking, harm avoidance, and self-transcendence and lower levels of self-directedness than control subjects. Their fathers displayed higher levels of novelty seeking and lower levels of persistence and self-directedness, and their mothers displayed lower levels of self-directedness compared with levels in control parents. In BPD families, temperament and character traits displayed high levels of discriminatory power. Novelty seeking in offspring with borderline personality disorder was significantly correlated with their mothers' novelty seeking and their fathers' self-transcendence. Self-directedness in borderline offspring was significantly correlated with both their mothers' and fathers' novelty seeking, and their self-transcendence was significantly correlated with their mothers' novelty seeking and harm avoidance. The different correlational pattern for borderline and control families is discussed. Characteristic personality patterns were found in BPD offspring and in both parents. The relationship between personality traits of borderline offspring and those of their parents may be related to both genetic transmission and family dynamics. Ramifications for treatment are discussed.

  6. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  7. Hanford inventory program user's manual

    International Nuclear Information System (INIS)

    Hinkelman, K.C.

    1994-01-01

    Provides users with instructions and information about accessing and operating the Hanford Inventory Program (HIP) system. The Hanford Inventory Program is an integrated control system that provides a single source for the management and control of equipment, parts, and material warehoused by Westinghouse Hanford Company in various site-wide locations. The inventory is comprised of spare parts and equipment, shop stock, special tools, essential materials, and convenience storage items. The HIP replaced the following systems; ACA, ASP, PICS, FSP, WSR, STP, and RBO. In addition, HIP manages the catalog maintenance function for the General Supplies inventory stocked in the 1164 building and managed by WIMS

  8. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  9. Strategic Inventories in Vertical Contracts

    OpenAIRE

    Krishnan Anand; Ravi Anupindi; Yehuda Bassok

    2008-01-01

    Classical reasons for carrying inventory include fixed (nonlinear) production or procurement costs, lead times, nonstationary or uncertain supply/demand, and capacity constraints. The last decade has seen active research in supply chain coordination focusing on the role of incentive contracts to achieve first-best levels of inventory. An extensive literature in industrial organization that studies incentives for vertical controls largely ignores the effect of inventories. Does the ability to ...

  10. LANDSAT-D data format control book. Volume 6, appendix G: GSFC HDT-AM inventory tape (GHIT-AM)

    Science.gov (United States)

    1981-01-01

    The data format specifications of the Goddard HDT inventory tapes (GHITS), which accompany shipments of archival digital multispectral scanner image data (HDT-AM tapes), are defined. The GHIT is a nine-track, 1600-BPI tape which conforms to the ANSI standard and serves as an inventory and description of the image data included in the shipment. The archival MSS tapes (HDT-AMs) contain radiometrically corrected but geometrically uncorrected image data plus certain ancillary data necessary to perform the geometric corrections.

  11. The step from the project control to long-distance control; Von der Projekt- zur Fernkontrolle

    Energy Technology Data Exchange (ETDEWEB)

    Kaelin, W. [Ingenieurbuero Werner Kaelin, Schwyz (Switzerland)

    1995-12-31

    In chapter 8 of the anthology about building control the extension from project control to long-distance control is described. The following aspects are discussed: guidelines (operating concept, task anthology), project (implementation, control, documentation), realisation (initiation, example), operation (regional co-operation, characteristic numbers). (BWI) [Deutsch] Kapitel 8 des Sammelbandes ueber Building Control ist dem Ausbau von der Projekt- zur Fernkontrolle gewidmet. In diesem Zusammenhang werden folgende Themen angesprochen: Vorgaben (Betriebskonzept, Pflichtenheft), Projekt (Umsetzung, Kontrolle, Dokumentation), Ausfuehrung (Inbetriebsetzung, Beispiel); Betrieb (regionaler Zusammenschluss, Kennzahlen). (BWI)

  12. Joint Optimization of Distribution Network Design and Two-Echelon Inventory Control with Stochastic Demand and CO2 Emission Tax Charges.

    Science.gov (United States)

    Li, Shuangyan; Li, Xialian; Zhang, Dezhi; Zhou, Lingyun

    2017-01-01

    This study develops an optimization model to integrate facility location and inventory control for a three-level distribution network consisting of a supplier, multiple distribution centers (DCs), and multiple retailers. The integrated model addressed in this study simultaneously determines three types of decisions: (1) facility location (optimal number, location, and size of DCs); (2) allocation (assignment of suppliers to located DCs and retailers to located DCs, and corresponding optimal transport mode choices); and (3) inventory control decisions on order quantities, reorder points, and amount of safety stock at each retailer and opened DC. A mixed-integer programming model is presented, which considers the carbon emission taxes, multiple transport modes, stochastic demand, and replenishment lead time. The goal is to minimize the total cost, which covers the fixed costs of logistics facilities, inventory, transportation, and CO2 emission tax charges. The aforementioned optimal model was solved using commercial software LINGO 11. A numerical example is provided to illustrate the applications of the proposed model. The findings show that carbon emission taxes can significantly affect the supply chain structure, inventory level, and carbon emission reduction levels. The delay rate directly affects the replenishment decision of a retailer.

  13. Joint Optimization of Distribution Network Design and Two-Echelon Inventory Control with Stochastic Demand and CO2 Emission Tax Charges.

    Directory of Open Access Journals (Sweden)

    Shuangyan Li

    Full Text Available This study develops an optimization model to integrate facility location and inventory control for a three-level distribution network consisting of a supplier, multiple distribution centers (DCs, and multiple retailers. The integrated model addressed in this study simultaneously determines three types of decisions: (1 facility location (optimal number, location, and size of DCs; (2 allocation (assignment of suppliers to located DCs and retailers to located DCs, and corresponding optimal transport mode choices; and (3 inventory control decisions on order quantities, reorder points, and amount of safety stock at each retailer and opened DC. A mixed-integer programming model is presented, which considers the carbon emission taxes, multiple transport modes, stochastic demand, and replenishment lead time. The goal is to minimize the total cost, which covers the fixed costs of logistics facilities, inventory, transportation, and CO2 emission tax charges. The aforementioned optimal model was solved using commercial software LINGO 11. A numerical example is provided to illustrate the applications of the proposed model. The findings show that carbon emission taxes can significantly affect the supply chain structure, inventory level, and carbon emission reduction levels. The delay rate directly affects the replenishment decision of a retailer.

  14. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry

    2010-01-01

    The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input

  15. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  16. Groundwater well inventory and assessment in the area of the proposed Normally Pressured Lance natural gas development project, Green River Basin, Wyoming, 2012

    Science.gov (United States)

    Sweat, Michael J.

    2013-01-01

    During May through September 2012, the U.S. Geological Survey, in cooperation with the Bureau of Land Management, inventoried and assessed existing water wells in southwestern Wyoming for inclusion in a possible groundwater-monitor network. Records were located for 3,282 wells in the upper Green River Basin, which includes the U.S. Geological Survey study area and the proposed Normally Pressured Lance natural gas development project area. Records for 2,713 upper Green River Basin wells were determined to be unique (not duplicated) and to have a Wyoming State Engineers Office permit. Further, 376 of these wells were within the U.S. Geological Survey Normally Pressured Lance study area. Of the 376 wells in the U.S. Geological Survey Normally Pressured Lance study area, 141 well records had sufficient documentation, such as well depth, open interval, geologic log, and depth to water, to meet many, but not always all, established monitor well criteria. Efforts were made to locate each of the 141 wells and to document their current condition. Field crews were able to locate 121 of the wells, and the remaining 20 wells either were not located as described, or had been abandoned and the site reclaimed. Of the 121 wells located, 92 were found to meet established monitor well criteria. Results of the field efforts during May through September 2012, and specific physical characteristics of the 92 wells, are presented in this report.

  17. Experiential learning in control systems laboratories and engineering project management

    Science.gov (United States)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  18. Power control for wind turbines in weak grids: Project summary

    DEFF Research Database (Denmark)

    Bindner, H.

    1999-01-01

    . The two case studies (Madeira, Portugal and Co. Donegal, Ireland) revealed that sometimes theleast cost and most attractive option is change in the operating strategy of the power system. This allowed that further wind energy can be integrated at competitive cost in the Madeira power system. In Co....... Donegal the options for pumped storage are goodcombined with good wind resources. Unfortunately the grid is weak. The least cost option for the feeder studied is either grid reinforcement or a power control system based on pumped storage if rather large amounts of wind energy are to be absorbed...... by thepower system. The cost estimates for the two options are in the same range. The current report is a summary of the work done in the project 'Power Control for Wind Turbines in Weak Grids'. The project has been partly funded by EU under contractJOR3-CT95-0067....

  19. Islamic Republic of Iran: Bushehr NPP. Project control. Annex 8

    International Nuclear Information System (INIS)

    Saboury

    1999-01-01

    This annex deals with project control. After almost 17 years of delay due to revolution and war, the work on BNPP-1 resumed. The new plant will be a combination of German and Russian designs and as such will present many unique technical and managerial problems. These will be accentuated by the fact that Iranian nuclear personnel are relatively young and inexperienced. In spite of hostile environmental conditions at the site, the equipment, structures and documentation have been relatively well presented. (author)

  20. Quality control of radioactive waste disposal container for borehole project

    International Nuclear Information System (INIS)

    Mohamad Pauzi Ismail; Suhairy Sani; Azhar Azmi; Ilham Mukhriz Zainal Abidin

    2014-01-01

    This paper explained quality control of radioactive disposal container for the borehole project. Non-destructive Testing (NDT) is one of the quality tool used for evaluating the product. The disposal container is made of 316L stainless steel. The suitable NDT method for this object is radiography, ultrasonic, penetrant and eddy current testing. This container will be filled with radioactive capsules and cement mortar is grouted to fill the gap. The results of NDT measurements are explained and discussed. (author)

  1. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  2. The Halden Reactor Project workshop meeting on control room development

    International Nuclear Information System (INIS)

    Miberg, Ann Britt; Green, Marie; Haukenes, Hanne; Larsen, Marit; Seim, Lars Aage; Veland, Oeystein

    1999-03-01

    The 'Control Room Development' workshop was organised in. Halden, November 5-6, 1998. The purpose of the workshop was to bring forward recommendations for the future use of HAMMLAB with respect to control room development. The workshop comprised thirteen presentations summarising current issues and status in control room development projects and related projects. Following the presentations, five working groups were formed. The purpose of the working groups was to establish a set of recommendations for the future use of HAMMLAB. Each working group developed a set of recommendations. The outcomes of the working groups' discussions were summarised in plenum by the working group chairs. During the workshop, all participants excluding the Halden Project staff were asked to fill in a questionnaire indicating which research topics they found most interesting to pursue in future HAMMLAB research. The purpose of this report is to summarise the workshop participants' presentations, the working groups' discussions, and the recommendations given by the workshop participants concerning the future use of HAMMLAB (author) (ml)

  3. National Biological Monitoring Inventory

    International Nuclear Information System (INIS)

    Burgess, R.L.

    1979-01-01

    The National Biological Monitoring Inventory, initiated in 1975, currently consists of four computerized data bases and voluminous manual files. MAIN BIOMON contains detailed information on 1,021 projects, while MINI BIOMON provides skeletal data for over 3,000 projects in the 50 states, Puerto Rico, the Virgin Islands, plus a few in Canada and Mexico. BIBLIO BIOMON and DIRECTORY BIOMON complete the computerized data bases. The structure of the system provides for on-line search capabilities to generate details of agency sponsorship, indications of funding levels, taxonomic and geographic coverage, length of program life, managerial focus or emphasis, and condition of the data. Examples of each of these are discussed and illustrated, and potential use of the Inventory in a variety of situations is emphasized

  4. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  5. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  6. Emissions from decentralised CHP plants 2007 - Energinet.dk Environmental project no. 07/1882. Project report 5 - Emission factors and emission inventory for decentralised CHP production

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Malene; Nielsen, Ole-Kenneth; Thomsen, M.

    2010-06-15

    Updated emission factors for decentralised combined heat and power (CHP) plants with a capacity < 25MWe have been estimated based on project emission measurements as well as emission measurements performed in recent years that were collected. The emission factors valid for 2006/2007 have been estimated for the plant technologies: Municipal solid waste (MSW) incineration plants, plants combusting straw or wood, natural gas fuelled reciprocating engines, biogas fuelled engines, natural gas fuelled gas turbines, gas oil fuelled reciprocating engines, gas oil fuelled gas turbines, steam turbines combusting residual oil and reciprocating engines combusting biomass producer gas based on wood. The emission factors for MSW incineration plants are much lower than the emission factors that were estimated for year 2000. The considerable reduction in the emission factors is a result of lower emission limit values in Danish legislation since 2006 that has lead to installation of new and improved flue gas cleaning systems in most MSW incineration plants. For CHP plants combusting wood or straw no major technical improvements have been implemented. The emission factors for natural gas fuelled reciprocating engines have been reduced since year 2000 as a result of technical improvements that have been carried out due to lower emission limit values in Danish legislation. The NO{sub x} emission factor for natural gas fuelled gas turbines has decreased 62 % since year 2000. This is a result of installation of low-NO{sub x} burners in almost all gas turbines that has been necessary to meet new emission limits in Danish legislation. The emission measurements programme included screening of the emissions of HCB, PCB, PCDD/-F and PBDD/-F. Compared to the Danish national emission decentralized CHP plants are major emission sources for CH{sub 4}, NO{sub x}, SO{sub 2}, heavy metals and HCB. (author)

  7. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Science.gov (United States)

    2010-04-01

    ...-way projects. The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects. ... 23 Highways 1 2010-04-01 2010-04-01 false Concurrent junkyard control and right-of-way projects...

  8. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm

  9. PERIODIC REVIEW SYSTEM FOR INVENTORY REPLENISHMENT CONTROL FOR A TWO-ECHELON LOGISTICS NETWORK UNDER DEMAND UNCERTAINTY: A TWO-STAGE STOCHASTIC PROGRAMING APPROACH

    OpenAIRE

    Cunha, P.S.A.; Oliveira, F.; Raupp, Fernanda M.P.

    2017-01-01

    ABSTRACT Here, we propose a novel methodology for replenishment and control systems for inventories of two-echelon logistics networks using a two-stage stochastic programming, considering periodic review and uncertain demands. In addition, to achieve better customer services, we introduce a variable rationing rule to address quantities of the item in short. The devised models are reformulated into their deterministic equivalent, resulting in nonlinear mixed-integer programming models, which a...

  10. Computation of order and volume fill rates for a base stock inventory control system with heterogeneous demand to investigate which customer class gets the best service

    OpenAIRE

    Larsen, Christian

    2006-01-01

    We consider a base stock inventory control system serving two customer classes whose demands are generated by two independent compound renewal processes. We show how to derive order and volume fill rates of each class. Based on assumptions about first order stochastic dominance we prove when one customer class will get the best service. That theoretical result is validated through a series of numerical experiments which also reveal that it is quite robust.

  11. A comparison between the order and the volume fill rates for a base-stock inventory control system under a compound renewal demand process

    OpenAIRE

    Larsen, Christian; Thorstenson, Anders

    2006-01-01

    The order fill rate is less commonly used than the volume fill rate (most often just denoted fill rate) as a performance measure for inventory control systems. However, in settings where the focus is on filling customer orders rather than total quantities, the order fill rate should be the preferred measure. In this paper we consider a continuous review, base-stock policy, where all replenishment orders have the same constant lead time and all unfilled demands are backordered. We develop exac...

  12. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  13. Impact of water control projects on fisheries resources in Bangladesh

    Science.gov (United States)

    Mirza, Monirul Qader; Ericksen, Neil J.

    1996-07-01

    Bangladesh is a very flat delta built up by the Ganges—Brahmaputra—Meghna/Barak river systems. Because of its geographical location, floods cause huge destruction of lives and properties almost every year. Water control programs have been undertaken to enhance development through mitigating the threat of disasters. This structural approach to flood hazard has severely affected floodplain fisheries that supply the major share of protein to rural Bangladesh, as exemplified by the Chandpur Irrigation Project. Although the regulated environment of the Chandpur project has become favorable for closed-water cultured fish farming, the natural open-water fishery loss has been substantial. Results from research show that fish yields were better under preproject conditions. Under project conditions per capita fish consumption has dropped significantly, and the price of fish has risen beyond the means of the poor people, so that fish protein in the diet of poor people is gradually declining. Bangladesh is planning to expand water control facilities to the remaining flood-prone areas in the next 15 20 years. This will cause further loss of floodplain fisheries. If prices for closed-water fish remain beyond the buying power of the poor, alternative sources of cheap protein will be required.

  14. Mine subsidence control projects associated with solid waste disposal facilities

    International Nuclear Information System (INIS)

    Wood, R.M.

    1994-01-01

    Pennsylvania environmental regulations require applicant's for solid waste disposal permits to provide information regarding the extent of deep mining under the proposed site, evaluations of the maximum subsidence potential, and designs of measures to mitigate potential subsidence impact on the facility. This paper presents three case histories of deep mine subsidence control projects at solid waste disposal facilities. Each case history presents site specific mine grouting project data summaries which include evaluations of the subsurface conditions from drilling, mine void volume calculations, grout mix designs, grouting procedures and techniques, as well as grout coverage and extent of mine void filling evaluations. The case studies described utilized basic gravity grouting techniques to fill the mine voids and fractured strata over the collapsed portions of the deep mines. Grout mixtures were designed to achieve compressive strengths suitable for preventing future mine subsidence while maintaining high flow characteristics to penetrate fractured strata. Verification drilling and coring was performed in the grouted areas to determine the extent of grout coverage and obtain samples of the in-place grout for compression testing. The case histories presented in this report demonstrate an efficient and cost effective technique for mine subsidence control projects

  15. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  16. Initial Radionuclide Inventories

    Energy Technology Data Exchange (ETDEWEB)

    H. Miller

    2004-09-19

    The purpose of this analysis is to provide an initial radionuclide inventory (in grams per waste package) and associated uncertainty distributions for use in the Total System Performance Assessment for the License Application (TSPA-LA) in support of the license application for the repository at Yucca Mountain, Nevada. This document is intended for use in postclosure analysis only. Bounding waste stream information and data were collected that capture probable limits. For commercially generated waste, this analysis considers alternative waste stream projections to bound the characteristics of wastes likely to be encountered using arrival scenarios that potentially impact the commercial spent nuclear fuel (CSNF) waste stream. For TSPA-LA, this radionuclide inventory analysis considers U.S. Department of Energy (DOE) high-level radioactive waste (DHLW) glass and two types of spent nuclear fuel (SNF): CSNF and DOE-owned (DSNF). These wastes are placed in two groups of waste packages: the CSNF waste package and the codisposal waste package (CDSP), which are designated to contain DHLW glass and DSNF, or DHLW glass only. The radionuclide inventory for naval SNF is provided separately in the classified ''Naval Nuclear Propulsion Program Technical Support Document'' for the License Application. As noted previously, the radionuclide inventory data presented here is intended only for TSPA-LA postclosure calculations. It is not applicable to preclosure safety calculations. Safe storage, transportation, and ultimate disposal of these wastes require safety analyses to support the design and licensing of repository equipment and facilities. These analyses will require radionuclide inventories to represent the radioactive source term that must be accommodated during handling, storage and disposition of these wastes. This analysis uses the best available information to identify the radionuclide inventory that is expected at the last year of last emplacement

  17. Lessons learned in process control at the Halden Reactor Project

    International Nuclear Information System (INIS)

    Kennedy, W.G.

    1989-12-01

    This report provides a list of those findings particularly relevant to regulatory authorities that can be derived from the research and development activities in computerized process control conducted at the Halden Reactor Project. The report was prepared by a staff member of the US Nuclear Regulatory Commission working at Halden. It identifies those results that may be of use to regulatory organizations in three main areas: as support for new requirements, as part of regulatory evaluations of the acceptability of new methods and techniques, and in exploratory research and development of new approaches to improve operator performance. More than 200 findings arranged in nine major categories are presented. The findings were culled from Halden Reactor Project documents, which are listed in the report

  18. Distribution method optimization : inventory flexibility

    NARCIS (Netherlands)

    Asipko, D.

    2010-01-01

    This report presents the outcome of the Logistics Design Project carried out for Nike Inc. This project has two goals: create a model to measure a flexibility aspect of the inventory usage in different Nike distribution channels, and analyze opportunities of changing the decision model of splitting

  19. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  20. Projected Growth in Small-Scale, Fossil-Fueled Distributed Generation: Potential Implications for the U.S. Greenhouse Gas Inventory

    Energy Technology Data Exchange (ETDEWEB)

    Eberle, Annika [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Heath, Garvin A [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-29

    The generation capacity of small-scale (less than one megawatt) fossil-fueled electricity in the United States is anticipated to grow by threefold to twenty-fold from 2015 to 2040. However, in adherence with internationally agreed upon carbon accounting methods, the Environmental Protection Agency's (EPA's) U.S. Greenhouse Inventory (GHGI) does not currently attribute greenhouse gases (GHGs) from these small-scale distributed generation sources to the electric power sector and instead accounts for these emissions in the sector that uses the distributed generation (e.g., the commercial sector). In addition, no other federal electric-sector GHG emission data product produced by the EPA or the U.S. Energy Information Administration (EIA) can attribute these emissions to electricity. We reviewed the technical documentation for eight federal electric-sector GHG emission data products, interviewed the data product owners, collected their GHG emission estimates, and analyzed projections for growth in fossil-fueled distributed generation. We show that, by 2040, these small-scale generators could account for at least about 1%- 5% of total CO2 emissions from the U.S. electric power sector. If these emissions fall outside the electric power sector, the United States may not be able to completely and accurately track changes in electricity-related CO2 emissions, which could impact how the country sets GHG reduction targets and allocates mitigation resources. Because small-scale, fossil-fueled distributed generation is expected to grow in other countries as well, the results of this work also have implications for global carbon accounting.

  1. Project B610 process control configuration acceptance test report

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators' console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing

  2. A test of the Forest Inventory and Analysis Program’s down woody material indicator for regional fuel estimation in the Southern Appalachian Mountains (PROJECT SO-F-06-01)

    Science.gov (United States)

    G. Geof Wang; Zhi-Ping Wang; Aaron D. Stottlemyer; Thomas A. Waldrop

    2013-01-01

    Both the National Fire Plan (http://199.134.225.50/nwcc/t2_wa4/ pdf/RuralAssistance.pdf) and the Healthy Forest Initiative (http://www.fs.fed.us/projects/ hfi/2003/august/documents/hfi-fact-sheet. pdf) call for reduction of hazardous fuels. Consequently, estimations of forest fuel loading at various scales become necessary. The Forest Inventory and Analysis (FIA)...

  3. Simulation of slag control for the Plasma Hearth Project

    International Nuclear Information System (INIS)

    Power, M.A.; Carney, K.P.; Peters. G.G.

    1996-01-01

    The goal of the Plasma Hearth Project is to stabilize alpha-emitting radionuclides in a vitreous slag and to reduce the effective storage volume of actinide-containing waste for long-term burial. The actinides have been shown to partition into the vitreous slag phase of the melt. The slag composition may be changed by adding glass-former elements to ensure that this removable slag has the most desired physical and chemical properties for long-term burial. A data acquisition and control system has been designed to regulate the composition of five elements in the slag

  4. Secure digital communication using controlled projective synchronisation of chaos

    International Nuclear Information System (INIS)

    Chee, C.Y.; Xu Daolin

    2005-01-01

    A new approach to chaos communication is proposed to encrypt digital information using controlled projective synchronisation. The scheme encrypts a binary sequence by manipulating the scaling feature of synchronisation from the coupled system. The transmitted signal therefore embeds only a single set of statistical properties. This prevents cryptanalysts from breaking the chaotic encryption scheme by using characteristic cryptanalysis that aims to detect switching of statistical properties in the intercepted information carrier signal. Pseudo-random switching key is incorporated into the scheme to masked out the deterministic nature of the underlying coupled system

  5. Optimising multi-product multi-chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs

    Science.gov (United States)

    Allah Taleizadeh, Ata; Niaki, Seyed Taghi Akhavan; Aryanezhad, Mir-Bahador

    2010-10-01

    While the usual assumptions in multi-periodic inventory control problems are that the orders are placed at the beginning of each period (periodic review) or depending on the inventory level they can happen at any time (continuous review), in this article, we relax these assumptions and assume that the periods between two replenishments of the products are independent and identically distributed random variables. Furthermore, assuming that the purchasing price are triangular fuzzy variables, the quantities of the orders are of integer-type and that there are space and service level constraints, total discount are considered to purchase products and a combination of back-order and lost-sales are taken into account for the shortages. We show that the model of this problem is a fuzzy mixed-integer nonlinear programming type and in order to solve it, a hybrid meta-heuristic intelligent algorithm is proposed. At the end, a numerical example is given to demonstrate the applicability of the proposed methodology and to compare its performance with one of the existing algorithms in real world inventory control problems.

  6. Inventory Abstraction

    International Nuclear Information System (INIS)

    Leigh, C.

    2000-01-01

    The purpose of the inventory abstraction as directed by the development plan (CRWMS M and O 1999b) is to: (1) Interpret the results of a series of relative dose calculations (CRWMS M and O 1999c, 1999d). (2) Recommend, including a basis thereof, a set of radionuclides that should be modeled in the Total System Performance Assessment in Support of the Site Recommendation (TSPA-SR) and the Total System Performance Assessment in Support of the Final Environmental Impact Statement (TSPA-FEIS). (3) Provide initial radionuclide inventories for the TSPA-SR and TSPA-FEIS models. (4) Answer the U.S. Nuclear Regulatory Commission (NRC)'s Issue Resolution Status Report ''Key Technical Issue: Container Life and Source Term'' (CLST IRSR) (NRC 1999) key technical issue (KTI): ''The rate at which radionuclides in SNF [Spent Nuclear Fuel] are released from the EBS [Engineered Barrier System] through the oxidation and dissolution of spent fuel'' (Subissue 3). The scope of the radionuclide screening analysis encompasses the period from 100 years to 10,000 years after the potential repository at Yucca Mountain is sealed for scenarios involving the breach of a waste package and subsequent degradation of the waste form as required for the TSPA-SR calculations. By extending the time period considered to one million years after repository closure, recommendations are made for the TSPA-FEIS. The waste forms included in the inventory abstraction are Commercial Spent Nuclear Fuel (CSNF), DOE Spent Nuclear Fuel (DSNF), High-Level Waste (HLW), naval Spent Nuclear Fuel (SNF), and U.S. Department of Energy (DOE) plutonium waste. The intended use of this analysis is in TSPA-SR and TSPA-FEIS. Based on the recommendations made here, models for release, transport, and possibly exposure will be developed for the isotopes that would be the highest contributors to the dose given a release to the accessible environment. The inventory abstraction is important in assessing system performance because

  7. INVENTORY ABSTRACTION

    International Nuclear Information System (INIS)

    Ragan, G.

    2001-01-01

    The purpose of the inventory abstraction, which has been prepared in accordance with a technical work plan (CRWMS M andO 2000e for/ICN--02 of the present analysis, and BSC 2001e for ICN 03 of the present analysis), is to: (1) Interpret the results of a series of relative dose calculations (CRWMS M andO 2000c, 2000f). (2) Recommend, including a basis thereof, a set of radionuclides that should be modeled in the Total System Performance Assessment in Support of the Site Recommendation (TSPA-SR) and the Total System Performance Assessment in Support of the Final Environmental Impact Statement (TSPA-FEIS). (3) Provide initial radionuclide inventories for the TSPA-SR and TSPA-FEIS models. (4) Answer the U.S. Nuclear Regulatory Commission (NRC)'s Issue Resolution Status Report ''Key Technical Issue: Container Life and Source Term'' (CLST IRSR) key technical issue (KTI): ''The rate at which radionuclides in SNF [spent nuclear fuel] are released from the EBS [engineered barrier system] through the oxidation and dissolution of spent fuel'' (NRC 1999, Subissue 3). The scope of the radionuclide screening analysis encompasses the period from 100 years to 10,000 years after the potential repository at Yucca Mountain is sealed for scenarios involving the breach of a waste package and subsequent degradation of the waste form as required for the TSPA-SR calculations. By extending the time period considered to one million years after repository closure, recommendations are made for the TSPA-FEIS. The waste forms included in the inventory abstraction are Commercial Spent Nuclear Fuel (CSNF), DOE Spent Nuclear Fuel (DSNF), High-Level Waste (HLW), naval Spent Nuclear Fuel (SNF), and U.S. Department of Energy (DOE) plutonium waste. The intended use of this analysis is in TSPA-SR and TSPA-FEIS. Based on the recommendations made here, models for release, transport, and possibly exposure will be developed for the isotopes that would be the highest contributors to the dose given a release

  8. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  9. Optimal control of quantum systems: a projection approach

    International Nuclear Information System (INIS)

    Cheng, C.-J.; Hwang, C.-C.; Liao, T.-L.; Chou, G.-L.

    2005-01-01

    This paper considers the optimal control of quantum systems. The controlled quantum systems are described by the probability-density-matrix-based Liouville-von Neumann equation. Using projection operators, the states of the quantum system are decomposed into two sub-spaces, namely the 'main state' space and the 'remaining state' space. Since the control energy is limited, a solution for optimizing the external control force is proposed in which the main state is brought to the desired main state at a certain target time, while the population of the remaining state is simultaneously suppressed in order to diminish its effects on the final population of the main state. The optimization problem is formulated by maximizing a general cost functional of states and control force. An efficient algorithm is developed to solve the optimization problem. Finally, using the hydrogen fluoride (HF) molecular population transfer problem as an illustrative example, the effectiveness of the proposed scheme for a quantum system initially in a mixed state or in a pure state is investigated through numerical simulations

  10. 30 CFR 220.032 - Inventories.

    Science.gov (United States)

    2010-07-01

    ... operations. The accumulation of surplus stocks shall be avoided by proper materiel control, inventory and... physical inventory that has not been credited to NPSL operations under § 220.015(a)(2) shall be credited to... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Inventories. 220.032 Section 220.032 Mineral...

  11. PROJECT PLANNING AND CONTROLLING GEDUNG RUSUNAWA UNIVERSITAS INDONESIA DENGAN MS.PROJECT

    Directory of Open Access Journals (Sweden)

    Sanny Stephanie

    2016-09-01

    Full Text Available Suatu proyek konstruksi selalu dimulai dengan proses perencanaan proyek (Project planning hingga pengendalian proyek (Project controlling Apabila terjadi perencanaan yang tidak matang dan pengendalian proyek yang kurang efektif, maka akan mengakibatkan penyimpangan dalam proyek tersebut seperti proyek selesai lebih cepat ataupun keterlambatan proyek.. Penelitian ini bertujuan untuk menganalisis perencanaan dan pengendalian proyek gedung Rusunawa Universitas Indonesia (asrama UI Jakarta Selatan dengan menggunakan bantuan program Microsoft Project. Berdasarkan kontrak, proyek ini dimulai pada tanggal 4 Desember 2014 s/d 10 Juli 2015. Dilihat dari hasil analisa kurva S Rencana dan kurva S aktual sampai dengan tanggal 31 Mei 2015, kurva S Aktual berada dibawah kurva S Rencana, dimana pada minggu ke-9 s/d minggu ke -35 proyek mengalami keterlambatan sebesar 18%, yaitu terlambat 10 hari dari rencana. Namun, dengan dilakukannya percepatan jadwal pada proyek ini dengan memperpendek durasi dan menambah tenaga kerja, maka penyelesaian proyek Rusunawa UI Jakarta Selatan ini masih dapat diselesaikan tepat waktu dan sesuai dengan jadwal yang telah ditentukan.

  12. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  13. Model of the impact of parameters controlling replenishment in the bs (min-max continuous review system on the actual inventory availibility

    Directory of Open Access Journals (Sweden)

    Stanisław Krzyżaniak

    2015-09-01

    Full Text Available Background: Due to random changes in demand, inventory management is still - despite the development of alternative goods flow management concepts - an important issue both in terms of costs of maintenance and replenishment as well as the level of service measured by inventory availability levels. There are a number of replenishment systems to be used in such conditions, but they are most often formed on the basis of two basic ones: a system based on the reorder point and based on periodic inspection.  This paper refers to the former system, the BS system (min-max, in which an order is placed after reaching inventory level B (information level, reorder point for a quantity allowing to reach level S. This system is very often used in business practice. Observations conducted under realistic conditions indicate the need to improve the classical models describing the system.  This results, among other things, from the fact that the actual level of available inventory at the start of the replenishment cycle may be significantly lower than level B, resulting in lower than expected levels of customer service. Taking account of this phenomenon through model determination of the cumulative distribution function for the observed difference makes it possible to select the correct parameters to control the replenishment system in question and - therefore - to achieve the expected economic effects. Methods: The object of the study is to create a mathematical model allowing the determination of the required inventory level B taking into account the difference D between this level and the actual level of inventory at the start of the replenishment cycle.  To determine the effect of various factors such as demand distribution parameters in the adopted unit of time and the difference between level S (max and B (min, a dedicated tool (simulator in EXCEL spreadsheet for determining the distribution of frequency of value D has been developed.  Then a

  14. Speciated OVOC and VOC emission inventories and their implications for reactivity-based ozone control strategy in the Pearl River Delta region, China.

    Science.gov (United States)

    Ou, Jiamin; Zheng, Junyu; Li, Rongrong; Huang, Xiaobo; Zhong, Zhuangmin; Zhong, Liuju; Lin, Hui

    2015-10-15

    The increasing ground-ozone (O3) levels, accompanied by decreasing SO2, NO2, PM10 and PM2.5 concentrations benefited from air pollution control measures implemented in recent years, initiated a serious challenge to control Volatile Organic Compound (VOC) emissions in the Pearl River Delta (PRD) region, China. Speciated VOC emission inventory is fundamental for estimating Ozone Formation Potentials (OFPs) to identify key reactive VOC species and sources in order to formulate efficient O3 control strategies. With the use of the latest bulk VOC emission inventory and local source profiles, this study developed the PRD regional speciated Oxygenated Volatile Organic Compound (OVOC) and VOC emission inventories to identify the key emission-based and OFP-based VOC sources and species. Results showed that: (1) Methyl alcohol, acetone and ethyl acetate were the major constituents in the OVOC emissions from industrial solvents, household solvents, architectural paints and biogenic sources; (2) from the emission-based perspective, aromatics, alkanes, OVOCs and alkenes made up 39.2%, 28.2%, 15.9% and 10.9% of anthropogenic VOCs; (3) from the OFP-based perspective, aromatics and alkenes become predominant with contributions of 59.4% and 25.8% respectively; (4) ethene, m/p-xylene, toluene, 1,2,4-trimethyl benzene and other 24 high OFP-contributing species were the key reactive species that contributed to 52% of anthropogenic emissions and up to 80% of OFPs; and (5) industrial solvents, industrial process, gasoline vehicles and motorcycles were major emission sources of these key reactive species. Policy implications for O3 control strategy were discussed. The OFP cap was proposed to regulate VOC control policies in the PRD region due to its flexibility in reducing the overall OFP of VOC emission sources in practice. Copyright © 2015 Elsevier B.V. All rights reserved.

  15. The nuclide inventory in SFR-1

    International Nuclear Information System (INIS)

    Ingemansson, Tor

    2001-10-01

    This report is an account for a project carried out on behalf of the Swedish Radiation Protection Authority (SSI): 'Nuclide inventory in SFR-1' (The Swedish underground disposal facility for low and intermediate level reactor waste). The project comprises the following five sub-projects: 1) Measuring methods for nuclides, difficult to measure, 2) The nuclide inventory in SFR-1, 3) Proposal for nuclide library for SFR-1 and ground disposal, 4) Nuclide library for exemption, and 5) Characterising of the nuclide inventory and documentation for SFL waste. In all five sub-projects long-lived activity, including Cl-36, has been considered

  16. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  17. Integrated data base for spent fuel and radwaste: inventories

    International Nuclear Information System (INIS)

    Notz, K.J.; Carter, W.L.; Kibbey, A.H.

    1982-01-01

    The Integrated Data Base (IDB) program provides and maintains current, integrated data on spent reactor fuel and radwaste, including historical data, current inventories, projected inventories, and material characteristics. The IDB program collects, organizes, integrates, and - where necessary - reconciles inventory and projection (I/P) and characteristics information to provide a coherent, self-consistent data base on spent fuel and radwaste

  18. Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Phyllis C. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  19. Inventory of Federal energy-related environment and safety research for FY 1978. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    1979-12-01

    The FY 1978 Federal Inventory is a compilation of 3225 federally funded energy-related environmental and safety reserch projects. It consists of three volumes: an executive summary providing an overview of the data (Volume I), a catalog listing each Inventory project followed by series of indexes (Volume II), and an interactive terminal guide giving instructions for on-line data retrieval (Volume III). Volume I reviews the inventory data as a whole and also within each of three major categories: biomedical and environmental research, environmental control technology research, and operational safety research

  20. Regulatory Framework for Controlling the Research Reactor Decommissioning Project

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2009-01-01

    Decommissioning is one of important stages in construction and operation of research reactors. Currently, there are three research reactors operating in Indonesia. These reactors are operated by the National Nuclear Energy Agency (BATAN). The age of the three research reactors varies from 22 to 45 years since the reactors reached their first criticality. Regulatory control of the three reactors is conducted by the Nuclear Energy Regulatory Agency (BAPETEN). Controlling the reactors is carried out based on the Act No. 10/1997 on Nuclear Energy, Government Regulations and BAPETEN Chairman Decrees concerning the nuclear safety, security and safeguards. Nevertheless, BAPETEN still lack of the regulation, especially for controlling the decommissioning project. Therefore, in the near future BAPETEN has to prepare the regulations for decommissioning, particularly to anticipate the decommissioning of the oldest research reactors, which probably will be done in the next ten years. In this papers author give a list of regulations should be prepared by BAPETEN for the decommissioning stage of research reactor in Indonesia based on the international regulatory practice

  1. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  2. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  3. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    The bestselling project management text for students andprofessionals-now updated and expanded This Eleventh Edition of the bestselling "bible" ofproject management maintains the streamlined approach of the prioreditions and moves the content even closer to PMI's ProjectManagement Body of Knowledge (PMBOK). New content has been added tothis edition on measuring project management ROI, value to theorganization and to customers, and much more. The capstone "super"case on the "Iridium Project" has been maintained, covering allaspects of project management. Increased use of sidebars throughoutthe book helps further align it with the PMBOK and the ProjectManagement Professional (PMP) Certification Exam. This new edition features significant expansion, including morethan three dozen entirely new sections and updates on processsupporting; types of project closure; project sponsorship; andculture, teamwork, and trust. This comprehensive guide to theprinciples and practices of project management: Offers new sections...

  4. Developing Inventory Projection Models Using Empirical Net Forest Growth and Growing-Stock Density Relationships Across U.S. Regions and Species Group

    Science.gov (United States)

    Prakash Nepal; Peter J. Ince; Kenneth E. Skog; Sun J. Chang

    2012-01-01

    This paper describes a set of empirical net forest growth models based on forest growing-stock density relationships for three U.S. regions (North, South, and West) and two species groups (softwoods and hardwoods) at the regional aggregate level. The growth models accurately predict historical U.S. timber inventory trends when we incorporate historical timber harvests...

  5. Validation of the Inventory of Interpersonal Problems (IIP-64): a comparison of Swedish female outpatients with anorexia nervosa or bulimia nervosa and controls.

    Science.gov (United States)

    Lindberg, Karolin; Nevonen, Lauri; Gustafsson, Sanna Aila; Nyman-Carlsson, Erika; Norring, Claes

    2018-04-27

    The aim of the study was to explore the psychometric properties of the Inventory of Interpersonal Problems (IIP-64) and to compare levels of interpersonal distress in Swedish female outpatients with anorexia nervosa or bulimia nervosa with age- and gender-matched controls. Totally, 401 participants were included; anorexia nervosa (n = 74), bulimia nervosa (n = 85) and controls (n = 242). All participants completed the IIP-64. The eating disorder (ED) patients also filled out the Eating Disorder Inventory-2/3 (EDI). Internal consistency of IIP-64 was acceptable to high. Principal component analyses with varimax rotation of the IIP-64 subscales confirmed the circumplex structure with two underlying orthogonal dimensions; affiliation and dominance. Significant correlations between EDI-3 composite scales ineffectiveness and interpersonal problems and IIP-64 were found. ED patients reported higher levels of interpersonal distress than controls on all but one subscale (intrusive/needy). IIP-64 can be considered to have acceptable to good reliability and validity in a Swedish ED sample. IIP-64 can be a useful complement in assessment of interpersonal problems in ED.

  6. Setting research priorities in tobacco control: a stakeholder engagement project.

    Science.gov (United States)

    Lindson, Nicola; Richards-Doran, Dan; Heath, Laura; Hartmann-Boyce, Jamie

    2017-12-01

    The Cochrane Tobacco Addiction Group (TAG) conducts systematic reviews of the evidence for tobacco cessation and prevention interventions. In 2016 TAG conducted a priority-setting, stakeholder engagement project to identify where further research is needed in the areas of tobacco control and smoking cessation. The project comprised two surveys and a workshop. A range of stakeholders participated, including members of the public (smokers and ex-smokers), clinicians, researchers, research funders, health-care commissioners and public health organizations. The first survey phase identified unanswered research questions in the field of tobacco control. The second phase asked participants to rank these, with overall rankings calculated by combining scores across participants. The workshop allowed attendees to discuss prioritization of topics and questions in more depth. Workshop discussions were transcribed and analysed thematically, and a final voting activity at the close of the workshop allowed participants to choose topics to prioritize and to de-prioritize. A total of 304 stakeholders (researchers, health professionals, smokers and ex-smokers, guideline developers, research funders and policymakers, representing 28 countries) identified 183 unanswered research questions. These were categorized into 15 research categories. A total of 175 participants prioritized categories and questions in the second survey phase, with 'electronic cigarettes'; 'addressing inequalities'; and 'mental health and other substance abuse' prioritized as the top three categories. Forty-three stakeholders attended the workshop and discussed reasons for and against category prioritization. Prioritized research categories largely mirrored those in the survey stage, although 'treatment delivery' also emerged as a key category. Five cross-cutting themes emerged: efficacy; relative efficacy; cost effectiveness; addressing inequalities; and different types of evidence. There are many unanswered

  7. A periodic review integrated inventory model with controllable setup cost, imperfect items, and inspection errors under service level constraint

    Science.gov (United States)

    Saga, R. S.; Jauhari, W. A.; Laksono, P. W.

    2017-11-01

    This paper presents an integrated inventory model which consists of single vendor and buyer. The buyer managed its inventory periodically and orders products from the vendor to satisfy the end customer’s demand, where the annual demand and the ordering cost were in the fuzzy environment. The buyer used a service level constraint instead of the stock-out cost term, so that the stock-out level per cycle was bounded. Then, the vendor produced and delivered products to the buyer. The vendor had a choice to commit an investment to reduce the setup cost. However, the vendor’s production process was imperfect, thus the lot delivered contained some defective products. Moreover, the buyer’s inspection process was not error-free since the inspector could be mistaken in categorizing the product’s quality. The objective was to find the optimum value for the review period, the setup cost, and the number of deliveries in one production cycle which might minimize the joint total cost. Furthermore, the algorithm and numerical example were provided to illustrate the application of the model.

  8. Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints

    International Nuclear Information System (INIS)

    Costantino, Francesco; Di Gravio, Giulio; Tronci, Massimo

    2013-01-01

    Inventory management of spare parts is one of the most critical issues in the aeronautical industry, given the required level of system availability related to the strategic importance and high stocking costs of the components. Even if a large number of spare parts increases warehousing costs, every single shortage have a greater impact: the adoption of best-in-class inventory management techniques becomes crucial. On these considerations, the paper presents an innovative model of spare parts allocation for the Italian Air Force with the aim of minimizing backorders and, at the same time, ensuring an availability of 99% depending on the actual flight plan. The model, solved by a marginal analysis, considers an original configuration of features combining different skills of maintenance centers in a hierarchical multi-echelon, multi-item, multi-indenture structure. A real case is provided in order to analyze the solving method and the results. -- Highlights: •We studied a problem of allocations for spare parts of aeronautical systems. •The model presents different repair capabilities of maintenance centers. •The model fits constraints on budget and on total operational availability. •The model is solved by a marginal analysis with a backorder/price ratio. •A numerical example shows a spare parts allocation with relative considerations

  9. Two models of inventory control with supplier selection in case of multiple sourcing: a case of Isfahan Steel Company

    Science.gov (United States)

    Rabieh, Masood; Soukhakian, Mohammad Ali; Mosleh Shirazi, Ali Naghi

    2016-06-01

    Selecting the best suppliers is crucial for a company's success. Since competition is a determining factor nowadays, reducing cost and increasing quality of products are two key criteria for appropriate supplier selection. In the study, first the inventories of agglomeration plant of Isfahan Steel Company were categorized through VED and ABC methods. Then the models to supply two important kinds of raw materials (inventories) were developed, considering the following items: (1) the optimal consumption composite of the materials, (2) the total cost of logistics, (3) each supplier's terms and conditions, (4) the buyer's limitations and (5) the consumption behavior of the buyers. Among diverse developed and tested models—using the company's actual data within three pervious years—the two new innovative models of mixed-integer non-linear programming type were found to be most suitable. The results of solving two models by lingo software (based on company's data in this particular case) were equaled. Comparing the results of the new models to the actual performance of the company revealed 10.9 and 7.1 % reduction in total procurement costs of the company in two consecutive years.

  10. Controle de estoque de peças de reposição em local único: uma revisão da literatura Single location spare parts inventory control: the state of the art

    Directory of Open Access Journals (Sweden)

    José Roberto do Rego

    2011-01-01

    Full Text Available Estoques de peças de reposição atendem necessidades de manutenção e reparo de produtos de consumo, veículos, máquinas e equipamentos industriais, acarretando frequentemente altos custos de capital e forte impacto no nível de serviço aos clientes. A grande multiplicidade de componentes, com ciclos de vida mais curtos e baixas demandas dificultam a gestão destes estoques. Este artigo apresenta revisão da literatura sobre modelos de controle de estoques de peças de reposição em local único, abordando tanto a previsão de demanda quanto o controle de estoques nos diferentes estágios do ciclo de vida das peças. A partir do levantamento bibliográfico, identificam-se algumas lacunas referentes à decisão de estocagem ou não de um item, elaboração de pedidos iniciais e finais, na integração de modelos de previsão de demanda com o controle de estoque e também de estudos de caso na aplicação prática dos modelos.Spare parts inventory are needed for maintenance and repair of final products, vehicles, industrial machines and equipments, frequently requiring high investments and significantly affecting customer satisfaction. Inventory management is complex due to the large number of different items and low demands. This article presents a literature review on single location spare parts inventory control, embracing both demand forecasting techniques and inventory control decisions on the different life cycle stages. Overall, the literature review identified the following research opportunities on inventory management: criteria to decide to stock or not an item, how many to order in the first and the last batch, demand forecasting and inventory control models integration and case studies on real applications.

  11. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  12. Improving the Greenlandic Greenhouse Gas Inventory

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Baunbæk, Lene; Gyldenkærne, Steen

    The project to improve the Greenlandic greenhouse gas (GHG) inventory was undertaken due to the recommendations made by the UNFCCC review team in connection with the 2008 and 2009 submissions by the Kingdom of Denmark. The improvements made to the Greenlandic GHG emission inventory were substantial...

  13. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  14. Wisconsin's fourth forest inventory, 1983.

    Science.gov (United States)

    John S. Jr. Spencer; W. Brad Smith; Jerold T. Hahn; Gerhard K. Raile

    1988-01-01

    The fourth inventory of the timber resource of Wisconsin shows that growing-stock volume increased from 11.2 to 15.5 billion cubic feet between 1968 and 1983, and area of timberland increased from 14.5 to 14.8 million acres. Presented are analysis and statistics on forest area and timber volume, growth, mortality, removals, and projections.

  15. 7 CFR 930.57 - Secondary inventory reserve.

    Science.gov (United States)

    2010-01-01

    ... shall retain control over the release of any cherries from the secondary inventory reserve. No cherries... 7 Agriculture 8 2010-01-01 2010-01-01 false Secondary inventory reserve. 930.57 Section 930.57... Handling Regulations § 930.57 Secondary inventory reserve. (a) In the event the inventory reserve...

  16. An integrated supply chain inventory model with imperfect-quality items, controllable lead time and distribution-free demand

    Directory of Open Access Journals (Sweden)

    Lin Hsien-Jen

    2013-01-01

    Full Text Available In this paper, we consider an integrated vendor-buyer inventory policy for a continuous review model with a random number of defective items and screening process gradually at a fixed screening rate in buyer’s arriving order lot. We assume that shortages are allowed and partially backlogged on the buyer’s side, and that the lead time demand distribution is unknown, except its first two moments. The objective is to apply the minmax distribution free approach to determine the optimal order quantity, reorder point, lead time and the number of lots delivered in one production run simultaneously so that the expected total system cost is minimized. Numerical experiments along with sensitivity analysis were performed to illustrate the effects of parameters on the decision and the total system cost.

  17. Project W-320 SAR and process control thermal analyses

    International Nuclear Information System (INIS)

    Sathyanarayana, K.

    1997-01-01

    This report summarizes the results of thermal hydraulic computer modeling supporting Project W-320 for process control and SAR documentation. Parametric analyses were performed for the maximum steady state waste temperature. The parameters included heat load distribution, tank heat load, fluffing factor and thermal conductivity. Uncertainties in the fluffing factor and heat load distribution had the largest effect on maximum waste temperature. Safety analyses were performed for off normal events including loss of ventilation, loss of evaporation and loss of secondary chiller. The loss of both the primary and secondary ventilation was found to be the most limiting event with saturation temperature in the bottom waste reaching in just over 30 days. An evaluation was performed for the potential lowering of the supernatant level in tank 241-AY-102. The evaluation included a loss of ventilation and steam bump analysis. The reduced supernatant level decreased the time to reach saturation temperature in the waste for the loss of ventilation by about one week. However, the consequence of a steam bump were dramatically reduced

  18. Legal control of technical large-scale projects

    International Nuclear Information System (INIS)

    Kuhnt, D.

    1981-01-01

    The principle derived from experience that large projects require approval by the courts may not longer be valid. On the contrary, the courts are only entitled to real legal control according to the principle of the division of powers. If not accurately defined legal terms cannot be waived, the administration has to set the frame for review by courts by technical standards to be given in statutory ordinances, administrative provisions and administrative instructions. The average term of administrative proceedings has to be shortened considerably. The plaintiff as well as the beneficiaries of the act of licensing have a right to a prompt decision. The immediate execution of a decision can, on principle, also not be waived in future. More than up to now, the careful consideration of the interests and not an anticipated judgement on the main issue has to be the subject of legal examination according to section 80, subsection 5 of the German code of administrative procedure (Verwaltungsgerichtsordnung). (orig./HP) [de

  19. United States Interagency Elevation Inventory (USIEI)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The U.S. Interagency Elevation Inventory displays high-accuracy topographic and bathymetric data for the United States and its territories. The project is a...

  20. Biota - 2009 Vegetation Inventory - Lake Ashtabula, ND

    Data.gov (United States)

    Army Corps of Engineers, Department of the Army, Department of Defense — 2009 Vegetation Classification for Lake Ashtabula, ND Vegetation Project Report, OMBIL Environmental Stewardship - Level 1 Inventory, U.S. Army Corps of Engineers...

  1. Biota - 2011 Vegetation Inventory - Marsh Lake, MN

    Data.gov (United States)

    Army Corps of Engineers, Department of the Army, Department of Defense — 2011 Vegetation Classification for Marsh Lake, MN Vegetation Project Report, OMBIL Environmental Stewardship - Level 1 Inventory. Marsh Lake is located on the...

  2. TSCA Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of the non confidential identities of chemical substances submitted under the Toxic Substances Control Act (TSCA). TSCA was enacted to ensure...

  3. The economics of tobacco control: evidence from the International Tobacco Control (ITC) Policy Evaluation Project.

    Science.gov (United States)

    Tauras, John A; Chaloupka, Frank J; Quah, Anne Chiew Kin; Fong, Geoffrey T

    2014-03-01

    Over the past few decades, the importance of economic research in advancing tobacco control policies has become increasingly clear. Extensive research has demonstrated that increasing tobacco taxes and prices is the single most cost-effective tobacco control measure. The research contained in this supplement adds to this evidence and provides new insights into how smokers respond to tax and price changes using the rich data on purchase behaviours, brand choices, tax avoidance and evasion, and tobacco use collected systematically and consistently across countries and over time by the International Tobacco Control (ITC) Project. The findings from this research will help inform policymakers, public health professionals, advocates, and others seeking to maximise the public health and economic benefits from higher taxes.

  4. Interlaboratory control among INCO-DEV MYCOTOX PROJECT LABORATORIES

    Directory of Open Access Journals (Sweden)

    E.A Vargas

    2011-04-01

    Full Text Available The Work Package 1 “ Development and standardization of effective analytical tools for mycotoxin (aflatoxins B1, B2  G1, G2  ochratoxin A, zearalenone, fumonisin B1, B2  and tricothecenes determination in wheat and maize”  aim to implement the interlaboratory control between the partners laboratories from Brazil, Uruguay, Chile and Argentina as part of the objectives of INCO-DEV MYCOTOX PROJECT 2003-2005  “The Development of a Food Quality Management System for the Control of Mycotoxins in cereal Production and Processing Chains in Latin America South Cone Countries”.  The ojectives of the interlaboratory control were: evaluate the performance of the laboratories and the main difficulties encountered in performing the analytical procedure for mycotoxins  determination in maize and wheat; contribute to the harmonization of analytical procedures of the partners laboratories and contribute to the laboratory’s proficiency in mycotoxin analysis.  Maize reference materials for aflatoxins and zearealenone were prepared and used to the implementation of the interlaboratory control.  In summary, the preparation of these samples involved: milling (<20 mesh, homogeneization, analysis to verify the homogeneity of the bulk material and packing (labelled vacuum “sachets” or plastic bottles and mycotoxin analysis.  The homogeneity of the material was investigated by the analysis of variance – ANOVA- according to International Harmonized Protocol for the Proficiency testing of (ChemicalAnalytical Laboratories as established by ISO 43-1 – Annex at 95% of confidence level by calculating an F-statistic ans Ss/ÿ (ÿ =15%. All batches of test material were stored under – 18ºC and protected from light prior to and after packaging.  Aflatoxins in the test materials were determinated by immunoaffinity with liquid chromatography (LC with pos-column derivatization and thin layer chromatography (TLC.  Zearalenone in the test materials

  5. Strategically oriented management and controlling of resource intensive projects; Strategieorientiertes Management und Controlling ressourcenintensiver Projekte. Fallstudienanalyse und Konzeption eines Referenzmodells zum Projektmanagement der Stilllegung kerntechnischer Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Kemmeter, Sascha

    2015-07-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  6. International IPCC workshop on methane and nitrous oxide: methods in national emissions inventories and options for control

    Energy Technology Data Exchange (ETDEWEB)

    Amstel, A.R. van (ed.)

    1993-07-01

    This workshop had two main objectives: to support the development of an internationally agreed methodology and reporting format for national emission inventories of greenhouse gases by mid 1993, as coordinated by the Science Working Group of the Intergovernmental Panel on Climate Change (IPCC) and the Organization for Economic Cooperation and Development (OECD); and the development of technical options for reduction of these greenhouse gases and the assessment of the socio-economic feasibility of these options. These proceedings contain the overview papers presented at the workshop, the background papers prepared for the working group sessions and the conclusions and recommendations of the working groups put forward during these sessions. 16 poster summaries are also included. During the workshop, 8 different sources of methane were discussed - oil and gas, coal mining, ruminants, animal waste, landfills and sewage treatments, combustion and industry, rice production and wetlands, and biomass burning - and 2 sources of nitrous oxide - agricultural soils and combustion and industry. All papers have been abstracted separately.

  7. Vendor Managed Inventory:Retail Industry Perspective of Malaysia

    OpenAIRE

    Madjlesi Taklimi, Zahra

    2011-01-01

    The concept of Vendor Managed Inventory (VMI) radically changes a traditional inventory management. Under the typical business model, the buyer or retailer is in total control of the timing and volume of the order, in order placing and managing the inventory plan. Whereas VMI is a supply chain initiative where the supplier is responsible for all decisions regarding inventories at the retailers, i.e. under VMI program the supplier is authorized to manage inventories of agreed-upon stock-keepin...

  8. The role of inventory management in Canadian economic fluctuations

    OpenAIRE

    Hung-Hay Lau

    1996-01-01

    Swings in inventory investment have traditionally played a major role in Canadian business cycles. However, advances in inventory-control techniques and the reduced uncertainty associated with lower inflation have enabled firms to manage their inventories much more tightly and effectively. This article examines recent developments in the management of non-farm business inventories in Canada at both the aggregate and the sectoral level and looks at implications for the role of inventories as a...

  9. Inventory of armourstone

    Directory of Open Access Journals (Sweden)

    Le Turdu Valéry

    2016-01-01

    Full Text Available Natural armourstone is widely used for hydraulic works, both in the coastal domain and in border of rivers and torrents, especially to protect against flood and the effects of waves and currents. To meet the expectations associated with this resource, an inventory of armourstone quarries was realized on a national scale in France. This inventory informs not only about the localization of quarries but also about the quality and the availability of materials. To fully optimize this inventory in a dynamic format, the association of all actors of the sector was preferred to archival research. This partnership approach led to project deliverables that can constitute durably a shared reference. The database can indeed be updated regularly thanks to the contacts established with the professionals of quarries. The access to this database is offered to a wide public: maritime and fluvial ports, local authorities in charge of planning and managing structures that protect against flood and other hydraulic hazards. This new database was organized considering its importance on the operational plan. This led to a hierarchical organization at two levels for each quarry face: first level, a synthesis sheet brings the essential information to realize choices upstream to the operational phases. Second level, a detailed specification sheet presents the technical characteristics observed in the past on the considered face. The atlas has two information broadcasting formats: a pdf file with browsing functions and a geographical information system that allows remote request of the database. These two media have their own updating rhythms, annual for the first and continue for the second.

  10. Otter Brook Lake, New Hampshire Connecticut River Basin, Flood Control Project, Solid Waste Management Plan

    National Research Council Canada - National Science Library

    1996-01-01

    .... This plan provides guidance to establish policies, and responsibilities, procedures, and instructions for proper handling, storage, disposal and recycling of solid waste generated at the flood control project...

  11. Perishable Inventory Challenges

    DEFF Research Database (Denmark)

    Damgaard, Cecilie Maria; Nguyen, Vivi Thuy; Hvolby, Hans-Henrik

    2012-01-01

    in the retail supply chains. The goal is to find and evaluate the parameters which affect the decision making process, when finding the optimal order quantity and order time. The paper takes a starting point in the retail industry but links to other industries.......The paper investigates how inventory control of perishable items is managed and line up some possible options of improvement. This includes a review of relevant literature dealing with the challenges of determining ordering policies for perishable products and a study of how the current procedures...

  12. Mechanical Engineering Design Project report: Enabler control systems

    Science.gov (United States)

    Cullen, Christian; Delvecchio, Dave; Scarborough, Alan; Havics, Andrew A.

    1992-01-01

    The Controls Group was assigned the responsibility for designing the Enabler's control system. The requirement for the design was that the control system must provide a simple user interface to control the boom articulation joints, chassis articulation joints, and the wheel drive. The system required controlling hydraulic motors on the Enabler by implementing 8-bit microprocessor boards. In addition, feedback to evaluate positions and velocities must be interfaced to provide the operator with confirmation as well as control.

  13. Archeological and Historic Cultural Resources Inventory for a Proposed Flood Control Project at Devils Lake, Ramsey County, North Dakota.

    Science.gov (United States)

    1983-10-01

    Chautauqua Association signed a contract with J.H. McCulloch to secure a right-of- way for the Chautauqua Railway. McCulloch received a 30 year franchise in...excavation at Bakery of U.S. military fort Palo Duro St. Park, TX; Test excavation at historic dugout Sea Rim State Park, TX; Archaeological survey San

  14. Archeological and Historic Cultural Resources Inventory for a Proposed Flood Control Project at Grafton, Walsh County, North Dakota.

    Science.gov (United States)

    1983-10-01

    10,000 B.C. to 6000 B.C.) subsistence was based primarily on exploitation of herds of big game animals, popularly referred to as megafauna. Much of this...Alkire Mound (32SI200), and Porcupine Creek Component (32SI6, an occupation site) , all located on the Missouri River and north of the North Dakota...attempting to form any idea of the numerous herds of buffalo which must have passed here" (Harold Printing Co. 1909). It is likely that such a region would

  15. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  16. Series of standards for use by an oil and gas production administration for progress-of work reports and inventory control

    Energy Technology Data Exchange (ETDEWEB)

    Kucherniuk, V A; Eliseev, V G; Iskandarov, R G

    1981-01-01

    Based on a study of the characteristics of product flows from oil wells, the test and monitoring equipment used to monitor the quantity of oil, and the standard documentation, it is demonstrated that in order to increase the measurement accuracy of the product produced by the oil and gas production administration, it is necessary to develop a system of enterprise standards to account for it. A list is given of standards of use by oil and gas production administration to account for its product. The use of the standards with existing metering equipment makes it possible to decrease the variation between operational and inventory records for the quantity of oil at the ''Rechitsaneft'' oil and gas production administration up to 5% and consequently to increase the control efficiency over the operation of the fields.

  17. PERIODIC REVIEW SYSTEM FOR INVENTORY REPLENISHMENT CONTROL FOR A TWO-ECHELON LOGISTICS NETWORK UNDER DEMAND UNCERTAINTY: A TWO-STAGE STOCHASTIC PROGRAMING APPROACH

    Directory of Open Access Journals (Sweden)

    P.S.A. Cunha

    Full Text Available ABSTRACT Here, we propose a novel methodology for replenishment and control systems for inventories of two-echelon logistics networks using a two-stage stochastic programming, considering periodic review and uncertain demands. In addition, to achieve better customer services, we introduce a variable rationing rule to address quantities of the item in short. The devised models are reformulated into their deterministic equivalent, resulting in nonlinear mixed-integer programming models, which are then approximately linearized. To deal with the uncertain nature of the item demand levels, we apply a Monte Carlo simulation-based method to generate finite and discrete sets of scenarios. Moreover, the proposed approach does not require restricted assumptions to the behavior of the probabilistic phenomena, as does several existing methods in the literature. Numerical experiments with the proposed approach for randomly generated instances of the problem show results with errors around 1%.

  18. Beck Depression Inventory (BDI) in patients with breast disease and breast cancer: a prospective case-control study.

    Science.gov (United States)

    Eskelinen, Matti; Ollonen, Paula

    2011-01-01

    In 1972, Beck introduced an inventory (BDI) for rapid screening of depression. The associations between the BDI and the risk of breast cancer (BC) are rarely considered together in prospective studies. In an extension of the Kuopio Breast Cancer Study, 115 women with breast cancer symptoms were semi-structurally interviewed in-depth as well as asked to complete standardised questionnaires (Forsen, Spielberger, MADRS), and all study variables were obtained before any diagnostic procedures were carried out. BDI was used to evaluate the depression of the study participants. The clinical examinations and biopsies showed BC in 34 patients, benign breast disease (BBD) in 53 patients, and 28 individuals were shown to be healthy (HSS). There was a trend for the women with HSS to have less sadness (BDI mean score, 0.27) than those of the BC (BDI mean score, 0.56) and BBD groups (BDI mean score, 0.49). The HSS group tended to be less pessimistic (BDI mean score, 0.15) than the patients in the BC group (BDI mean score, 0.44) and in the BBD group (BDI mean score, 0.42). The HSS group also had less self-accusation (BDI mean score, 0.19) than the patients in the BC group (BDI mean score, 0.50) and the patients in the BBD group (BDI mean score, 0.62). The HSS group also reported less work inhibition and weight loss than the patients in the BC group and in the BBD group. The mean sum of the scores of BDI variables was significantly lower in the HSS group (BDI mean score, 7.1) than in the BC (BDI mean score, 8.4) or BBD groups (BDI mean score, 8.8). The results of this study do not support a specific link between BDI and breast cancer risk. However, the patients with BC and BBD tended to have an increased risk for depressive symptoms.

  19. Inventories and sales uncertainty\\ud

    OpenAIRE

    Caglayan, M.; Maioli, S.; Mateut, S.

    2011-01-01

    We investigate the empirical linkages between sales uncertainty and firms´ inventory investment behavior while controlling for firms´ financial strength. Using large panels of manufacturing firms from several European countries we find that higher sales uncertainty leads to larger stocks of inventories. We also identify an indirect effect of sales uncertainty on inventory accumulation through the financial strength of firms. Our results provide evidence that financial strength mitigates the a...

  20. Oxygen control systems and impurity purification in LBE: Learning from DEMETRA project

    Energy Technology Data Exchange (ETDEWEB)

    Brissonneau, L., E-mail: laurent.brissonneau@cea.fr [CEA/DEN, Cadarache, DTN/STPA/LIPC, F-13108 Saint-Paul-lez-Durance (France); Beauchamp, F.; Morier, O. [CEA/DEN, Cadarache, DTN/STPA/LIPC, F-13108 Saint-Paul-lez-Durance (France); Schroer, C.; Konys, J. [Karlsruher Institut fuer Technologie (KIT), Institut fuer Materialforschung III, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Kobzova, A.; Di Gabriele, F. [NRI, UJV Husinec-Rez 130, Rez 25068 (Czech Republic); Courouau, J.-L. [CEA/DEN, Saclay, DPC/SCCME/LECNA, F-919191 Gif-sur-Yvette (France)

    2011-08-31

    Operating a system using Lead-Bismuth Eutectic (LBE) requires a control of the dissolved oxygen concentration to avoid corrosion of structural materials and oxide build-up in the coolant. Reliable devices are therefore needed to monitor and adjust the oxygen concentration and to remove impurities during operation. In this article, we describe the learning gained from experiments run in the framework of the DEMETRA project (IP-EUROTRANS 6th FP contract) on the oxygen supply in LBE and on impurity filtration and management in different European facilities. An oxygen control device should supply oxygen in LBE at sufficient rate to compensate loss by surface oxidation, otherwise local dissolution of oxide layers might lead to the loss of steel protection against dissolution. Oxygen can be supplied by gas phase H{sub 2}O or O{sub 2}, or by solid phase, PbO dissolution. Each of these systems has substantial advantages and drawbacks. Considerations are given on devices for large scale facilities. The management of impurities (lead oxides and corrosion products) is also a crucial issue as their presence in the liquid phase or in the aerosols is likely to impair the facility, instrumentation and mechanical devices. To avoid impurity build-up on the long-term, purification of LBE is required to keep the impurity inventory low by trapping oxide and metallic impurities in specific filter units. On the basis of impurities characterisation and experimental results gained through filtration tests in different loops, this paper gives a description of the state-of-art knowledge of LBE purification with different filter media. It is now understood that the nature and behaviour of impurities formed in LBE will change according to the operating modes as well as the method to propose to remove impurities. This experience can be used to validate the basis filtration process, define the operating procedures and evaluate perspectives for the design of purification units for long

  1. Adaptive Control and Function Projective Synchronization in 2D Discrete-Time Chaotic Systems

    International Nuclear Information System (INIS)

    Li Yin; Chen Yong; Li Biao

    2009-01-01

    This study addresses the adaptive control and function projective synchronization problems between 2D Rulkov discrete-time system and Network discrete-time system. Based on backstepping design with three controllers, a systematic, concrete and automatic scheme is developed to investigate the function projective synchronization of discrete-time chaotic systems. In addition, the adaptive control function is applied to achieve the state synchronization of two discrete-time systems. Numerical results demonstrate the effectiveness of the proposed control scheme.

  2. Top-down model estimates, bottom-up inventories, and future projections of global natural and anthropogenic emissions of nitrous oxide

    Science.gov (United States)

    Davidson, E. A.; Kanter, D.

    2013-12-01

    Nitrous oxide (N2O) is the third most abundantly emitted greenhouse gas and the largest remaining emitted ozone depleting substance. It is a product of nitrifying and denitrifying bacteria in soils, sediments and water bodies. Humans began to disrupt the N cycle in the preindustrial era as they expanded agricultural land, used fire for land clearing and management, and cultivated leguminous crops that carry out biological N fixation. This disruption accelerated after the industrial revolution, especially as the use of synthetic N fertilizers became common after 1950. Here we present findings from a new United Nations Environment Programme report, in which we constrain estimates of the anthropogenic and natural emissions of N2O and consider scenarios for future emissions. Inventory-based estimates of natural emissions from terrestrial, marine and atmospheric sources range from 10 to 12 Tg N2O-N/yr. Similar values can be derived for global N2O emissions that were predominantly natural before the industrial revolution. While there was inter-decadal variability, there was little or no consistent trend in atmospheric N2O concentrations between 1730 and 1850, allowing us to assume near steady state. Assuming an atmospheric lifetime of 120 years, the 'top-down' estimate of pre-industrial emissions of 11 Tg N2O-N/yr is consistent with the bottom-up inventories for natural emissions, although the former includes some modest pre-industrial anthropogenic effects (probably business-as-usual scenarios over the period 2013-2050 is ~102 Tg N2O-N; equivalent to ~48 Gt CO2e or ~2730 kt ozone depleting potential. The impact of growing demand for biofuels is highly uncertain, ranging from trivial to the most significant N2O source to date, depending on the types of plants, their nutrient management, the amount of land used for their cultivation, and the fates of their waste products.

  3. Coordination and Control of Globally Distributed Software Projects

    NARCIS (Netherlands)

    P.C. van Fenema (Paul)

    2002-01-01

    textabstractRecently, software development and implementation projects have globalized at a rapid pace. Companies in North America, Europe, and the Far East are beginning to integrate international Information Technology (IT) resources to support operations across the globe. Offshore IT services

  4. The environmental control and life support system advanced automation project

    Science.gov (United States)

    Dewberry, Brandon S.

    1991-01-01

    The objective of the ECLSS Advanced Automation project includes reduction of the risk associated with the integration of new, beneficial software techniques. Demonstrations of this software to baseline engineering and test personnel will show the benefits of these techniques. The advanced software will be integrated into ground testing and ground support facilities, familiarizing its usage by key personnel.

  5. An ex ante control chart for project monitoring using earned duration management observations

    Science.gov (United States)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  6. Risk control in energy saving projects; Control de riesgo en los proyectos de ahorro de energia

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan [Lawrence Berkeley National Laboratory, CA (United States)

    2005-10-15

    Since one of the restrictive problems when investing in energy saving is the uncertainty of obtaining the planed savings, a technique in the risk handling for energy efficiency projects, called Insurance for the Energy Saving (IES) is presented. IES economically stimulates those who implement projects for energy saving so they go beyond the normal measures and really obtain significant saving levels, thus contributing to the fulfillment of national objectives in energy saving. In order to reduce the risk of low performance in energy caused by saving projects there exist the international performance measurement and the protocol of investment (IMPVP) as well as diagnoses and starting processes, whereas in order to transfer the financial risk that a saving project represents, mechanisms such as FDIC insurance, conversion of the debt in values, Saving's Guarantees, Performance Bonuses or Guarantee Bonuses and Insurances for Energy Saving can be of great help. This article deals on the IES insurance policies, their loss control management, successful cases, benefits, particular advantages, place in the market and refers argued insurance exceptions and perception surveys. [Spanish] Dado que uno de los problemas restrictivos a la hora de invertir en el ahorro de energia es la incertidumbre de obtener los ahorros proyectados, se presenta una tecnica en el manejo del riesgo para proyectos de eficiencia energetica llamada Seguro para el Ahorro de Energia (SAE). SAE estimula financieramente a quienes implementan proyectos para el ahorro de energia con el fin de que vayan mas alla de las medidas normales y consigan niveles significativos de ahorro, contribuyendo asi al cumplimiento de objetivos nacionales de ahorro energetico. Para reducir el riesgo de bajo desempeno de energia provocados por proyectos de ahorro existe la medicion del desempeno internacional y el protocolo de inversion (IMPVP) asi como diagnosticos y procesos de arranque, mientras que para transferir el

  7. Housing Inventory Count

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the data communities reported to HUD about the nature of their dedicated homeless inventory, referred to as their Housing Inventory Count (HIC)....

  8. Integrated inventory information system

    Digital Repository Service at National Institute of Oceanography (India)

    Sarupria, J.S.; Kunte, P.D.

    The nature of oceanographic data and the management of inventory level information are described in Integrated Inventory Information System (IIIS). It is shown how a ROSCOPO (report on observations/samples collected during oceanographic programme...

  9. World Glacier Inventory

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The World Glacier Inventory (WGI) contains information for over 130,000 glaciers. Inventory parameters include geographic location, area, length, orientation,...

  10. HHS Enterprise Data Inventory

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Enterprise Data Inventory (EDI) is the comprehensive inventory listing of agency data resources including public, restricted public, and non-public datasets.

  11. Science Inventory | US EPA

    Science.gov (United States)

    The Science Inventory is a searchable database of research products primarily from EPA's Office of Research and Development. Science Inventory records provide descriptions of the product, contact information, and links to available printed material or websites.

  12. National Wetlands Inventory Polygons

    Data.gov (United States)

    Minnesota Department of Natural Resources — Wetland area features mapped as part of the National Wetlands Inventory (NWI). The National Wetlands Inventory is a national program sponsored by the US Fish and...

  13. A Multinomial Logit Approach to Estimating Regional Inventories by Product Class

    Science.gov (United States)

    Lawrence Teeter; Xiaoping Zhou

    1998-01-01

    Current timber inventory projections generally lack information on inventory by product classes. Most models available for inventory projection and linked to supply analyses are limited to projecting aggregate softwood and hardwood. The objective of this research is to develop a methodology to distribute the volume on each FIA survey plot to product classes and...

  14. Prediction of Safety Stock Using Fuzzy Time Series (FTS and Technology of Radio Frequency Identification (RFID for Stock Control at Vendor Managed Inventory (VMI

    Directory of Open Access Journals (Sweden)

    Mashuri Chamdan

    2018-01-01

    Full Text Available This research was conducted by prediction of safety stock using Fuzzy Time Series (FTS and technology of Radio Frequency Identification (RFID for stock control at Vendor Managed Inventory (VMI. Well-controlled stock influenced company revenue and minimized cost. It discussed about information system of safety stock prediction developed through programming language of PHP. Input data consisted of demand got from automatic, online and real time acquisition using technology of RFID, then, sent to server and stored at online database. Furthermore, data of acquisition result was predicted by using algorithm of FTS applying universe of discourse defining and fuzzy sets determination. Fuzzy set result was continued to division process of universe of discourse in order to be to final step. Prediction result was displayed at information system dashboard developed. By using 60 data from demand data, prediction score was 450.331 and safety stock was 135.535. Prediction result was done by error deviation validation using Mean Square Percent Error of 15%. It proved that FTS was good enough in predicting demand and safety stock for stock control. For deeper analysis, researchers used data of demand and universe of discourse U varying at FTS to get various result based on test data used.

  15. Prediction of Safety Stock Using Fuzzy Time Series (FTS) and Technology of Radio Frequency Identification (RFID) for Stock Control at Vendor Managed Inventory (VMI)

    Science.gov (United States)

    Mashuri, Chamdan; Suryono; Suseno, Jatmiko Endro

    2018-02-01

    This research was conducted by prediction of safety stock using Fuzzy Time Series (FTS) and technology of Radio Frequency Identification (RFID) for stock control at Vendor Managed Inventory (VMI). Well-controlled stock influenced company revenue and minimized cost. It discussed about information system of safety stock prediction developed through programming language of PHP. Input data consisted of demand got from automatic, online and real time acquisition using technology of RFID, then, sent to server and stored at online database. Furthermore, data of acquisition result was predicted by using algorithm of FTS applying universe of discourse defining and fuzzy sets determination. Fuzzy set result was continued to division process of universe of discourse in order to be to final step. Prediction result was displayed at information system dashboard developed. By using 60 data from demand data, prediction score was 450.331 and safety stock was 135.535. Prediction result was done by error deviation validation using Mean Square Percent Error of 15%. It proved that FTS was good enough in predicting demand and safety stock for stock control. For deeper analysis, researchers used data of demand and universe of discourse U varying at FTS to get various result based on test data used.

  16. Functional Assessment Inventory Manual.

    Science.gov (United States)

    Crewe, Nancy M.; Athelstan, Gary T.

    This manual, which provides extensive new instructions for administering the Functional Assessment Inventory (FAI), is intended to enable counselors to begin using the inventory without undergoing any special training. The first two sections deal with the need for functional assessment and issues in the development and use of the inventory. The…

  17. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  18. Activity based costing model for inventory valuation

    Directory of Open Access Journals (Sweden)

    Vineet Chouhan

    2017-03-01

    Full Text Available Activity-Based-Model (ABC is used for the purpose of significant improvement for overhead accounting systems by providing the best information required for managerial decision. This pa-per discusses implacability of ABC technique on inventory valuation as a management account-ing innovation. In order to prove the applicability of ABC for inventory control a material driven medium-sized and privately owned company from engineering (iron and steel industry is select-ed and by analysis of its production process and its material dependency and use of indirect in-ventory, an ABC model is explored for better inventory control. The case revealed that the ne-cessity of ABC in the area of inventory control is significant. The company is not only able to increase its quality of decision but also it can significantly analyze its cost of direct material cost, valuation of direct material and use its implications for better decision making.

  19. Tijuana River Flood Control Project, San Diego County, California.

    Science.gov (United States)

    1976-05-20

    presence of historical and archeological resoureces in the proposed project area. His letter of August 1, 1973 (see appendix) indicated that no state... human misery among those directly affected. Those impacts will be pert of the permanent and disastrous legacy of the "Recommended Plan" (Alternative Ill...of citizens; and general human misery among those directly affected. Those impacts will be part of the permanent and disastrous legacy of the

  20. Multi-model-based Access Control in Construction Projects

    Directory of Open Access Journals (Sweden)

    Frank Hilbert

    2012-04-01

    Full Text Available During the execution of large scale construction projects performed by Virtual Organizations (VO, relatively complex technical models have to be exchanged between the VO members. For linking the trade and transfer of these models, a so-called multi-model container format was developed. Considering the different skills and tasks of the involved partners, it is not necessary for them to know all the models in every technical detailing. Furthermore, the model size can lead to a delay in communication. In this paper an approach is presented for defining model cut-outs according to the current project context. Dynamic dependencies to the project context as well as static dependencies on the organizational structure are mapped in a context-sensitive rule. As a result, an approach for dynamic filtering of multi-models is obtained which ensures, together with a filtering service, that the involved VO members get a simplified view of complex multi-models as well as sufficient permissions depending on their tasks.

  1. Retail inventory management with lost sales

    NARCIS (Netherlands)

    Curseu - Stefanut, A.

    2012-01-01

    The inventory control problem of traditional store-based grocery retailers has several challenging features. Demand for products is stochastic, and is typically lost when no inventory is available on the shelves. As the consumer behavior studies reveal, only a small percentage of customers are

  2. Controlling the Instructional Development Process. Training Development and Research Center Project Number Fifteen.

    Science.gov (United States)

    Sleezer, Catherine M.; Swanson, Richard A.

    Process control is a way of training managers in business and industry to plan, monitor, and communicate the instructional development process of training projects. Two simple and useful tools that managers use in controlling the process of instructional development are the Process Control Planning Sheet and the Process Control Record. The Process…

  3. Controle de estoque por revisão contínua e revisão periódica: uma análise comparativa utilizando simulação Continuous and periodic review inventory control: a comparative analysis using simulation

    Directory of Open Access Journals (Sweden)

    Hobed Rosa

    2010-12-01

    Full Text Available O estudo e a concepção de modelos de gestão de estoque, baseados na ideia básica de lote econômico de compra (LEC, continuam sendo áreas de interesse para pesquisa. Mais recentemente, tais pesquisas têm abordado a avaliação e a quantificação dos impactos desses modelos sobre a performance da cadeia de suprimentos. Nesse sentido, este trabalho investiga a importância, do ponto de vista de estoque médio e custo total, de se trabalhar com fornecedores que garantam prazos de entrega confiáveis quando o LEC é adotado como política de reposição. Utilizando simulação, duas sistemáticas (Q e P de controle de estoque são comparadas para níveis distintos de dispersão do tempo médio de ressuprimento do fornecedor. Para tempos de ressuprimento inferiores ou próximos ao intervalo ótimo de pedido, a sistemática Q mostra-se vantajosa, enquanto para tempos maiores as duas sistemáticas praticamente se equivalem. Testes de hipótese são utilizados para análise dos resultados.The basic idea introduced in the Economic Order Quantity (EOQ model is still an important approach in the study and design of models for inventory management. Recently, some research projects have sought to assess the effects and impacts of these inventory models on supply chain performance. In this context, the paper investigates the consequence of supplier delivery lead-time uncertainty on average inventory held and total cost incurred over a period in a company that uses EOQ rules as replenishment policy. Through computer simulation we compare two inventory control models (herein referred to as Q and P "systematic" using a range of values for the supplier's delivery lead time standard deviation. When lead-time is short or close to optimum replenishment interval systematic Q is found to be better. However, for long delivery lead-time the results of both models are nearly equals. Statistical hypothesis tests are applied in the analyses.

  4. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  5. Personality features in ultra-high risk for psychosis: a comparative study with schizophrenia and control subjects using the Temperament and Character Inventory-Revised (TCI-R).

    Science.gov (United States)

    Fresán, Ana; León-Ortiz, Pablo; Robles-García, Rebeca; Azcárraga, Mariana; Guizar, Diana; Reyes-Madrigal, Francisco; Tovilla-Zárate, Carlos Alfonso; de la Fuente-Sandoval, Camilo

    2015-02-01

    Several variables have been identified as risk factors for conversion to overt psychosis in ultra-high risk for psychosis (UHR) individuals. Although almost two-thirds of them do not experience a transition to psychosis, they still exhibit functional disabilities. Other subjective developmental features may be useful for a more precise identification of individuals at UHR. Avoidant behaviors are consistently reported in schizophrenia and in UHR individuals and may be the reflection of a pattern of personality. Thus, personality features in UHR individuals deserves further research. The objective of the present study was to compare temperament and character dimensions between UHR individuals, patients with schizophrenia and healthy controls. One hundred participants (25 UHR individuals, 25 schizophrenia patients and 50 control subjects) where evaluated with the Temperament and Character Inventory-Revised (TCI-R). Univariate ANOVAs followed by Bonferroni tests were used. UHR individuals and schizophrenia patients exhibited higher levels of Harm Avoidance (HA) when compared to control subjects. For HA1 Anticipatory worry vs Uninhibited optimism and HA4 Fatigability & asthenia, UHR and schizophrenia groups showed similar scores and both groups were higher compared to control subjects. With respect to Cooperativeness (CO), UHR and schizophrenia reported lower scores than control subjects, in particular CO2 Empathy vs Social disinterest and CO3 Helpfulness vs unhelpfulness. This study replicates and extends the consideration of HA as a psychopathological related endophenotype and gives us further information of the possible role of personality features in the expression of some of the social dysfunctions observed both in prodromal subjects and schizophrenia patients. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  7. Overview and status of the prototype project for Wendelstein 7-X control system

    Energy Technology Data Exchange (ETDEWEB)

    Schacht, Joerg [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)], E-mail: joerg.schacht@ipp.mpg.de; Bluhm, Torsten; Herbst, Uwe; Hennig, Christine; Heinrich, Stefan; Kuehner, Georg; Koester, Erik; Laqua, Heike; Lewerentz, Marc; Marquardt, Mirco; Meyer, Christiane; Mueller, Ina; Pingel, Steffen; Sachtleben, Juergen; Spring, Anett; Werner, Andreas; Woelk, Andreas [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)

    2009-06-15

    This contribution gives an overview of the project 'Prototype W7-X control system'. The objective of this prototype project is to demonstrate the applicability of the segment orientated control system at a running fusion experiment including steady-state operation, interaction of all relevant components, real time control, data acquisition and on-line data analysis. Furthermore, the W7-X safety concept will be implemented at WEGA and tested.

  8. Hoxb1 controls anteroposterior identity of vestibular projection neurons.

    Science.gov (United States)

    Chen, Yiju; Takano-Maruyama, Masumi; Fritzsch, Bernd; Gaufo, Gary O

    2012-01-01

    The vestibular nuclear complex (VNC) consists of a collection of sensory relay nuclei that integrates and relays information essential for coordination of eye movements, balance, and posture. Spanning the majority of the hindbrain alar plate, the rhombomere (r) origin and projection pattern of the VNC have been characterized in descriptive works using neuroanatomical tracing. However, neither the molecular identity nor developmental regulation of individual nucleus of the VNC has been determined. To begin to address this issue, we found that Hoxb1 is required for the anterior-posterior (AP) identity of precursors that contribute to the lateral vestibular nucleus (LVN). Using a gene-targeted Hoxb1-GFP reporter in the mouse, we show that the LVN precursors originate exclusively from r4 and project to the spinal cord in the stereotypic pattern of the lateral vestibulospinal tract that provides input into spinal motoneurons driving extensor muscles of the limb. The r4-derived LVN precursors express the transcription factors Phox2a and Lbx1, and the glutamatergic marker Vglut2, which together defines them as dB2 neurons. Loss of Hoxb1 function does not alter the glutamatergic phenotype of dB2 neurons, but alters their stereotyped spinal cord projection. Moreover, at the expense of Phox2a, the glutamatergic determinants Lmx1b and Tlx3 were ectopically expressed by dB2 neurons. Our study suggests that the Hox genes determine the AP identity and diversity of vestibular precursors, including their output target, by coordinating the expression of neurotransmitter determinant and target selection properties along the AP axis.

  9. Hoxb1 controls anteroposterior identity of vestibular projection neurons.

    Directory of Open Access Journals (Sweden)

    Yiju Chen

    Full Text Available The vestibular nuclear complex (VNC consists of a collection of sensory relay nuclei that integrates and relays information essential for coordination of eye movements, balance, and posture. Spanning the majority of the hindbrain alar plate, the rhombomere (r origin and projection pattern of the VNC have been characterized in descriptive works using neuroanatomical tracing. However, neither the molecular identity nor developmental regulation of individual nucleus of the VNC has been determined. To begin to address this issue, we found that Hoxb1 is required for the anterior-posterior (AP identity of precursors that contribute to the lateral vestibular nucleus (LVN. Using a gene-targeted Hoxb1-GFP reporter in the mouse, we show that the LVN precursors originate exclusively from r4 and project to the spinal cord in the stereotypic pattern of the lateral vestibulospinal tract that provides input into spinal motoneurons driving extensor muscles of the limb. The r4-derived LVN precursors express the transcription factors Phox2a and Lbx1, and the glutamatergic marker Vglut2, which together defines them as dB2 neurons. Loss of Hoxb1 function does not alter the glutamatergic phenotype of dB2 neurons, but alters their stereotyped spinal cord projection. Moreover, at the expense of Phox2a, the glutamatergic determinants Lmx1b and Tlx3 were ectopically expressed by dB2 neurons. Our study suggests that the Hox genes determine the AP identity and diversity of vestibular precursors, including their output target, by coordinating the expression of neurotransmitter determinant and target selection properties along the AP axis.

  10. Inventory - Dollars and sense

    International Nuclear Information System (INIS)

    Samson, J.R.

    1992-01-01

    Nuclear utilities are becoming more aware of the importance of having an inventory investment that supports two opposing philosophies. The business philosophy wants a minimal inventory investment to support a better return on invested dollars. This increase in return comes from having the dollars available to invest versus having the money tied up in inventory sitting on the shelf. The opposing viewpoint is taken by maintenance/operations organizations, which desire the maximum inventory available on-site to repair any component at any time to keep the units on-line at all times. Financial managers also want to maintain cash flow throughout operations so that plants run without interruptions. Inventory management is therefore a mixture of financial logistics with an operation perspective in mind. A small amount of common sense and accurate perception also help. The challenge to the materials/inventory manager is to optimize effectiveness of the inventory by having high material availability at the lowest possible cost

  11. KENDALI OPTIMAL DARI SISTEM INVENTORI DENGAN PENINGKATAN DAN PENURUNAN BARANG

    Directory of Open Access Journals (Sweden)

    P Affandi

    2016-03-01

    Full Text Available Terdapat banyak permasalahan yang melibatkan teori sistem dan teori kontrol serta aplikasinya. Contohnya, beberapa referensi teori  yang mengaplikasikan teori kontrol ke dalam masalah inventori. Masalah klasik dalam masalah inventori adalah bagaimana mengatur perubahan permintaan konsumen pada sebuah produk barang jadi. Selain mengalami penurunan yang disebabkan kerusakan dan kemerosotan, ternyata inventori juga bisa mengalami peningkatan. Biasanya, inventori yang mengalami peningkatan terjadi pada inventori yang melakukan proses produksi yang berlangsung secara terus menerus; Sedangkan permintaan sedikit juga terjadi pada inventori makhluk hidup yang mengalami perkembangbiakan. Selanjutnya, hal ini mengakibatkan terjadinya peningkatan jumlah inventori. Dapat disimpulkan bahwa secara teori, sistem Inventori dapat mengalami peningkatan dan penurunan. Masalah ini dapat dimodelkan dan diselesaikan dengan menggunakan teknik kontrol optimal, sehingga akan diperoleh nilai optimal tingkat inventori dan rata-rata produksi optimal.There are many problems involving the theory of systems, control theory and its application. For example, some reference theories apply control theory to the inventory problems. The classical problem in the inventory problem was how to manage changes in consumer demand in a finished product. Besides it declines caused by damage and deterioration, evidently inventory can also increase. Typically, inventories that increased were inventories have production process continues over time; While little demand also occurred in inventories of living beings who have breeding. evidently, this led to an increasing in the amount of inventory. It can be concluded that, in theory, inventory system can be increased and decreased. This problem can be modeled and solved using optimal control techniques, so it will be obtained an optimum value of inventory levels and the average optimal production.

  12. Radiation control in the core shroud replacement project of Fukushima-Daiichi NPS Unit no.2

    International Nuclear Information System (INIS)

    Kokubun, Yasunori; Haraguchi, Kazuyuki; Yoshizawa, Yuji; Yamada, Yasuo

    2000-01-01

    In Fukushima-Daiichi NPS Unit no.2, the core shroud replacement was made following that of Unit no.3. This project involves replacement of wide-ranging equipment, with the project extending over a long period of time. This was expected to increase the dose equivalent of workers. Accordingly, various measures to lower the dose equivalent were planned and implemented. We outline radiation controls implemented during the project period. The shroud replacement project was a preventive maintenance project which consisted of replacing the core shroud and other internals with those less susceptible to stress corrosion cracking. Problems related to radiation control during the replacement project of Unit no.3 the year before last were summarized. We studied, planned, and implemented measures to be reflected in the project for Unit no.2. This was done to lower the dose equivalent as much as possible while paying due attention to safety and economy. For radiation control during the project for Unit no.2, experiments with Unit no.3 were fully exploited and any effective measures taken at that time were adopted in this project. Problems pointed out after that project with Unit no.3 resulted in new or improved measures being taken with Unit no.2. Measures taken over from the project with Unit no.3; a. Daily analysis of difference between expected and actual dose equivalents b. Dose reduction measures, chemical decontamination, temporary shield, flushing, etc.; New or improved measures; a. Dose reduction measures: Mechanical removal of radiation sources, strengthening of shield, etc.; b. Automatic remote control system; c. Use of new protective devices. With measures implemented as described above, the dose equivalent during shroud replacement of Unit no.2 was reduced by about 30% when compared with that (11.5 persons · Sv) in the case of Unit no.3. Implemented radiation controls will be checked and reviewed in future for reflection in projects with other units. (author)

  13. State-of-the-art inventory

    NARCIS (Netherlands)

    Verhagen, H.J.; Van Gerven, K.A.J.; Akkerman, G.J.

    2005-01-01

    The present report provides a state-of-the-art inventory of relevant information and technical concepts for the ComCoast project, being the first phase of the research stages of Work Package 3 (WP3). This project was assigned to Royal Haskoning by CUR. The information scan was set-up in a systematic

  14. U.S. Environmental Protection Agency's Enterprise Data Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — Complete Enterprise Dataset Inventory (EDI) listing all agency data assets for compliance with federal Project Open Data mandate (https://project-open-data.cio.gov/).

  15. Toward integrated opisthorchiasis control in northeast Thailand: the Lawa project.

    Science.gov (United States)

    Sripa, Banchob; Tangkawattana, Sirikachorn; Laha, Thewarach; Kaewkes, Sasithorn; Mallory, Frank F; Smith, John F; Wilcox, Bruce A

    2015-01-01

    Human liver fluke, Opisthorchis viverrini, a food-borne trematode is a significant public health problem in Southeast Asia, particularly in Thailand. Despite a long history of control programmes in Thailand and a nationwide reduction, O. viverrini infection prevalence remains high in the northeastern provinces. Therefore, a new strategy for controlling the liver fluke infection using the EcoHealth/One Health approach was introduced into the Lawa Lake area in Khon Kaen province where the liver fluke is endemic. A programme has been carried using anthelminthic treatment, novel intensive health education methods both in the communities and in schools, ecosystem monitoring and active community participation. As a result, the infection rate in the more than 10 villages surrounding the lake has declined to approximate one third of the average of 50% as estimated by a baseline survey. Strikingly, the Cyprinoid fish species in the lake, which are the intermediate host, now showed less than 1% prevalence compared to a maximum of 70% at baseline. This liver fluke control programme, named "Lawa model," is now recognised nationally and internationally, and being expanding to other parts of Thailand and neighbouring Mekong countries. Challenges to O. viverrini disease control, and lessons learned in developing an integrative control programme using a community-based, ecosystem approach, and scaling-up regionally based on Lawa as a model are described. Copyright © 2014 Elsevier B.V. All rights reserved.

  16. Measurements and controls implementation for the WEST project

    International Nuclear Information System (INIS)

    Daniel, Raju; Bhandarkar, Manisha; Moreau, P.

    2015-01-01

    This paper provides an overview of the diagnostics implemented on WEST and gives more details on the infra-red system which is one of the main systems used to analyze the heat loads and ensure the machine protection. The modification of the CODAC and communications networks is also discussed. The new functionalities and architecture of the WEST PCS are detailed; especially it ensures the orchestration of many subsystems such as diagnostics, actuators and allows handling asynchronous off-normal events during the plasma discharge. In correlation the plasma discharge is now seen as a set of elementary pieces (called segments) joints together. Development of new plasma controllers will be addressed. An overview of the first wall monitoring activity and development is provided. Finally preparing the plasma restart requires control oriented modelling and simulations devoted to the control of the plasma shape will be presented

  17. Financial auditing at enterprises for control of projects realized with credit fund-raising

    Science.gov (United States)

    Lukmanova, Inessa

    2017-10-01

    The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.

  18. Projection and enterprises controlling in domestic waste water econom

    Directory of Open Access Journals (Sweden)

    Schröder Reinhard

    2000-03-01

    Full Text Available The development of the cost of communal waste water disposal is widely discussed among the population, among politicians and experts. Not only the absolute amount of the charged fees are the cause of concern, but also their increase over the last few years. As part of this thesis, the PC software SloVaKon, which facilitates project and operation decision, will be designed to apply the experience gained during the building and expansion of the waste water industry in Germany´s five new federal states to the conditions in the Slovak republic. For this, a comparison of both country´s topographical, technical, legal and economical conditions proved necessary.

  19. Validation and Standardization of the Weight Control Perceived Self-Effi cacy Inventory in a Mexican College Population

    Directory of Open Access Journals (Sweden)

    Erick Landeros-Olvera

    2015-01-01

    Full Text Available Objetivo: Evaluar si el inventario Auto-eficacia Percibida para el Control de Peso (AP-CP es reproducible en población universitaria. Material y Métodos: Estudio de proceso, observacional y prolectivo. Se invitó a 60 sujetos de dos regiones geográficas de México para responder el AP-CP en dos ocasiones por separado. Resultados. El Índice de Validez de Contenido fue de 0.96. En la prueba re-prueba, la diferencia promedio fue 0.7; coeficiente α =0.95. El inventario también fue sensible para detectar diferencias de acuerdo a género y grados de IMC. Conclusión. El inventario AP-CP es reproducible y sensible para aplicarse en población mexicana universitaria.

  20. Suppression of hydrogenated carbon film deposition by scavenger techniques and their application to the tritium inventory control of fusion devices

    International Nuclear Information System (INIS)

    Tabares, F.L.; Tafalla, D.; Tanarro, I.; Herrero, V.J.; Islyaikin, A.; Maffiotte, C.

    2002-01-01

    The well-known radical and ion scavenger techniques of application in amorphous hydrogenated carbon film deposition studies are investigated in relation to the mechanism of tritium and deuterium co-deposition in carbon-dominated fusion devices. A particularly successful scheme results from the injection of nitrogen into methane/hydrogen plasmas for conditions close to those prevailing in the divertor region of present fusion devices. A complete suppression of the a-C : H film deposition has been achieved for N 2 /CH 4 ratios close to one in methane (5%)/hydrogen DC plasma. The implications of these findings in the tritium retention control in future fusion reactors are addressed. (author). Letter-to-the-editor

  1. Quality Control and Due Diligence in Project Management: Getting Decisions Right by Taking the Outside View

    OpenAIRE

    Bent Flyvbjerg

    2013-01-01

    This paper explores how theories of the planning fallacy and the outside view may be used to conduct quality control and due diligence in project management. First, a much-neglected issue in project management is identified, namely that the front-end estimates of costs and benefits--used in the business cases, cost-benefit analyses, and social and environmental impact assessments that typically support decisions on projects--are typically significantly different from actual ex post costs and ...

  2. Process for planning and control of software projects using XedroGESPRO

    OpenAIRE

    Jacqueline Marín-Sánchez; José Alejandro Lugo-García; Pedro Yobanis Piñero-Pérez; Alena María Santiesteban-García; Félix Noel Abelardo-Santana; Javier Menéndez-Rizo

    2014-01-01

    The software project management in Cuba has become a key area for improving production processes and decisionmaking in organizations. Several models and standards for process improvement, related with project management, proposed best practices on issues of planning and control of projects. However, they are generic guidelines that describe only those activities to execute, leaving the responsibility for implementing to organizations, using sometimes , expensive proprietary infor...

  3. 76 FR 27649 - Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): Initial...

    Science.gov (United States)

    2011-05-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): Initial Review The meeting... Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC) announces the...

  4. 75 FR 30410 - Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Provider...

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Provider and Public Health... Federal Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC...

  5. 75 FR 28626 - Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): SIP 10...

    Science.gov (United States)

    2010-05-21

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): SIP 10-029, Pilot Study... Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC) announces the...

  6. 77 FR 30292 - Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial...

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Project (SIP): Initial Review The meeting...)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control and...

  7. 75 FR 30410 - Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): Outcomes...

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): Outcomes of Screening... 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92- 463), the Centers for Disease Control and...

  8. 77 FR 29351 - Disease, Disability, and Injury Prevention and Control; Special Interest Projects (SIPs): Initial...

    Science.gov (United States)

    2012-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control; Special Interest Projects (SIPs): Initial Review The meeting.... L. 92-463), the Centers for Disease Control and Prevention (CDC) announces the aforementioned...

  9. 75 FR 32190 - Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs...

    Science.gov (United States)

    2010-06-07

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Interest Projects (SIPs): Examining the Impact of... Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC) announces the...

  10. Programmable logic controllers in Heavy Water Project, Manuguru (Paper No. 3.4)

    International Nuclear Information System (INIS)

    Gupta, S.C.; Bhaskar, R.; Maiti, A.; Venkatesu, G.; Satish, P.; Goel, R.K.

    1992-01-01

    Enhancement to plant operational flexibility has been achieved in Heavy Water Project, Manuguru by installing programmable logic controllers for its control equipment. The earlier sulfide based Heavy Water Plant, Kota is using relay logic and diode based program-matrix for binary controls. Performance improvement and advantages of PLC and experience in its operation are described. (author). 3 refs

  11. Cultural Resources Survey and Archeological Inventory of the Proposed Carrollton Revetment Project, Orleans Parish, Louisiana, Phase 1. Volume 1 of 2

    Science.gov (United States)

    2004-11-01

    The proposed project area has a humid sub- kin ash (Fraxinus profunda ), green ash (Frax- tropical climate with prevailing southerly winds. inus...leans on June 27, 1967, is 39’ (1020 F) (Magill Salix nigra Black willow 1990:6; Trahan 1989; Peters and Beall 2002). Fraxinus profunda Pumpkin ash...In addition, the Internet radio show "New bait blue glass jar embossed "BROM... /EM...," Orleans Nostalgia" references radio advertise- refers to a

  12. Project Orion, Environmental Control and Life Support System Integrated Studies

    Science.gov (United States)

    Russell, James F.; Lewis, John F.

    2008-01-01

    Orion is the next vehicle for human space travel. Humans will be sustained in space by the Orion subystem, environmental control and life support (ECLS). The ECLS concept at the subsystem level is outlined by function and technology. In the past two years, the interface definition with other subsystems has increased through different integrated studies. The paper presents the key requirements and discusses three recent studies (e.g., unpressurized cargo) along with the respective impacts on the ECLS design moving forward.

  13. A Multidisciplinary PBL Robot Control Project in Automation and Electronic Engineering

    Science.gov (United States)

    Hassan, Houcine; Domínguez, Carlos; Martínez, Juan-Miguel; Perles, Angel; Capella, Juan-Vicente; Albaladejo, José

    2015-01-01

    This paper presents a multidisciplinary problem-based learning (PBL) project consisting of the development of a robot arm prototype and the implementation of its control system. The project is carried out as part of Industrial Informatics (II), a compulsory third-year course in the Automation and Electronic Engineering (AEE) degree program at the…

  14. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    Science.gov (United States)

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  15. A periodic review integrated inventory model with controllable safety stock and setup cost under service level constraint and distribution-free demand

    Science.gov (United States)

    Kurdhi, N. A.; Jamaluddin, A.; Jauhari, W. A.; Saputro, D. R. S.

    2017-06-01

    In this study, we consider a stochastic integrated manufacturer-retailer inventory model with service level constraint. The model analyzed in this article considers the situation in which the vendor and the buyer establish a long-term contract and strategic partnership to jointly determine the best strategy. The lead time and setup cost are assumed can be controlled by an additional crashing cost and an investment, respectively. It is assumed that shortages are allowed and partially backlogged on the buyer’s side, and that the protection interval (i.e., review period plus lead time) demand distribution is unknown but has given finite first and second moments. The objective is to apply the minmax distribution free approach to simultaneously optimize the review period, the lead time, the setup cost, the safety factor, and the number of deliveries in order to minimize the joint total expected annual cost. The service level constraint guarantees that the service level requirement can be satisfied at the worst case. By constructing Lagrange function, the analysis regarding the solution procedure is conducted, and a solution algorithm is then developed. Moreover, a numerical example and sensitivity analysis are given to illustrate the proposed model and to provide some observations and managerial implications.

  16. [Project summarize of "reestablishing disease prevention and control system of China"].

    Science.gov (United States)

    Hao, Mo; Yu, Jingjin; Yu, Mingzhu; Duan, Yong

    2005-01-01

    This paper introduced the project of "reestablishing the disease control and prevention system of China" in brief, including background, objectives, funding resources, researching objects and sampling methods. This project which funded by National Outstanding Younger Fund and the research fund of MOH aimed at nailing down the key problem existed in disease control and prevention system of China, demonstrating the reasons and mechanism of key problem, developing feasible policy idea and strategy. This paper also introduced some issues concerning the reestablishing of the disease control and prevention system of China: the definition of public function, the standard of human resource allocation and the standard of financing. The Centers for Disease Control and Prevention in 8 provinces, 80 cities and 80 counties have been sampled to provide information that project needed. In addition, this project also cited some data which come from the early study, in which 3 provinces, 12 counties, 49 towns, 179 villages and 9781 rural families have been sampled and investigated.

  17. Guidance for growth factors, projections, and control strategies for the 15 percent rate-of-progress plans

    International Nuclear Information System (INIS)

    1993-03-01

    Section 182(b)(1) of the Clean Air Act (Act) requires all ozone nonattainment areas classified as moderate and above to submit a State Implementation Plan (SIP) revision by November 15, 1993, which describes, in part, how the areas will achieve an actual volatile organic compound (VOC) emissions reduction of at least 15 percent during the first 6 years after enactment of the Clean Air Act Amendments of 1990 (CAAA). In addition, the SIP revision must describe how any growth in emissions from 1990 through 1996 will be fully offset. It is important to note that section 182(b)(1) also requires the SIP for moderate areas to provide for reductions in VOC and nitrogen oxides (NOx) emissions as necessary to attain the national primary ambient air quality standard for ozone by November 15, 1996. The guidance document focuses on the procedures for developing 1996 projected emissions inventories and control measures which moderate and above ozone nonattainment areas must include in their rate-of-progress plans. The document provides technical guidance to support the policy presented in the 'General Preamble: Implementation of Title I of the CAAA of 1990' (57 FR 13498)

  18. Managing and reallocating inventory across two markets with local information

    NARCIS (Netherlands)

    Spiliotopoulou, E.

    2018-01-01

    Consider a firm that controls inventory centrally for two separate markets that are managed by regional managers having local demand information. The central planner provides a dedicated inventory level to each market, to ensure a minimum service level, but can reallocate inventory once associated

  19. 76 FR 33780 - Extension of Time for Inventory

    Science.gov (United States)

    2011-06-09

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Extension of Time for Inventory AGENCY... inventories of Native American human remains and associated funerary objects in their possession or control. Recent regulations (43 CFR 10.13) provide deadlines for completing inventories of human remains and...

  20. Review of inventory systems with deterioration since 2001

    NARCIS (Netherlands)

    Bakker, M.; Riezebos, J.; Teunter, R.H.

    2012-01-01

    This paper presents an up-to-date review of the advances made in the field of inventory control of perishable items (deteriorating inventory). The last extensive review on this topic dates back to 2001 (Goyal S.K. and Giri B.C., Recent trends in modeling of deteriorating inventory, European Journal