  1. Readiness Review Plan for the Interim Remedial Action on Surface Debris in Waste Area Grouping 11 at Oak Ridge National Laboratory, Oak Ridge, TN

    International Nuclear Information System (INIS)

    1993-10-01

    This Readiness Review Plan was prepared by the Waste Area Grouping (WAG) 11 Site Project Readiness Review Team as an overview of the Interim Remedial Action on Surface Debris in WAG 11 project at Oak Ridge National Laboratory, including major readiness milestones, criteria development methodology, and a list of events to occur as part of the review process for determining readiness for each project phase

  2. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  3. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  4. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  5. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  6. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  7. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  8. Interim report on long range plan for nuclear physics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  9. Electricity market readiness plan : Ontario Energy Board

    International Nuclear Information System (INIS)

    2001-03-01

    This document informs electric power market participants of the Ontario Energy Board's newly developed market readiness plan and target timelines that local distribution companies (LDCs) must meet for retail marketing. The Ontario Energy Board's plan incorporates relevant independent market operator (IMO)-administered market milestones with retail market readiness targeted for September 2001. The market readiness framework involves a self-certification process for LDCs by August 10, 2001, through which the Board will be able to monitor progress and assess the feasibility of meeting the target timelines. For retail market readiness, all LDCs will have to calculate settlement costs, produce unbundled bills, provide standard supply service, change suppliers and accommodate retail transactions. LDCs must be either authorized participants in the IMO-administered market or become retail customers of their host LDC. Unbundled bills will include itemized charges for energy price, transmission, distribution and debt retirement charge. 1 tab., 1 fig

  10. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  11. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  12. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  13. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  14. Readiness to proceed: Characterization planning basis

    International Nuclear Information System (INIS)

    Adams, M.R.

    1998-01-01

    This report summarizes characterization requirements, data availability, and data acquisition plans in support of the Phase 1 Waste Feed Readiness to Proceed Mid-Level Logic. It summarizes characterization requirements for the following program planning documents: Waste Feed Readiness Mid-Level Logic and Decomposition (in development); Master blue print (not available); Tank Waste Remediation System (TWRS) Operations and Utilization Plan and Privatization Contract; Enabling assumptions (not available); Privatization low-activity waste (LAW) Data Quality Objective (DQO); Privatization high-level waste (HLW) DQO (draft); Problem-specific DQOs (in development); Interface control documents (draft). Section 2.0 defines the primary objectives for this report, Section 3.0 discusses the scope and assumptions, and Section 4.0 identifies general characterization needs and analyte-specific characterization needs or potential needs included in program documents and charts. Section 4.0 also shows the analyses that have been conducted, and the archive samples that are available for additional analyses. Section 5.0 discusses current plans for obtaining additional samples and analyses to meet readiness-to-proceed requirements. Section 6.0 summarizes sampling needs based on preliminary requirements and discusses other potential characterization needs. Many requirements documents are preliminary. In many cases, problem-specific DQOs have not been drafted, and only general assumptions about the document contents could be obtained from the authors. As a result, the readiness-to-proceed characterization requirements provided in this document are evolving and may change

  15. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  16. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  17. Category 3 investigation-derived waste Readiness Evaluation Plan

    International Nuclear Information System (INIS)

    Ludowise, J.D.

    1996-08-01

    This Readiness Evaluation Plan presents the methodology used to assess the readiness for loading investigation-derived waste (IDW) drums on trucks for transport to the Environmental Restoration Disposal Facility (ERDF). The scope of this Readiness Evaluation Plan includes an assessment of the organizations, procedures, and regulatory approvals necessary for the handling of IDW containers and the subsequent transportation of materials to ERDF

  18. Military Readiness: DODs Readiness Rebuilding Efforts May Be at Risk without a Comprehensive Plan

    Science.gov (United States)

    2016-09-01

    specific elements that are to be in strategic plans. 8Chairman of the Joint Chiefs of Staff Guide 3401D, CJCS Guide to the Chairman’s Readiness ...all its major functions and operations. DOD strategic guidance makes it clear that rebuilding readiness is a priority that supports the... readiness recovery efforts. Evaluations of the plan to monitor goals and objectives Assessments, through objective measurement and systematic

  19. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  20. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  1. Radioprotection plan at the Abadia interim repository

    International Nuclear Information System (INIS)

    Hunt, J.G.; Rabello, P.N.P.; Tranjan Filho, A.

    1993-01-01

    The wastes from Goiania radiological accident are temporarily stored at a site near the village of Abadia de Goias, 23 km for far from downtown Goiania. Foreseeing operations inside the storage yard, a Radioprotection Plan was organize primarily with the aim of establishing procedures to reduce radiation exposure of workers to as-low-as reasonably achievable (ALARA principles and to be at the adopted regulatory exposure radiation limits. The adequacy of the storage containers and their reconditioning are the operations involved. (B.C.A.). 09 refs, 02 tabs

  2. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  3. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  4. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  5. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  6. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Carl J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  7. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  8. T Tank Farm Interim Cover Test - Design Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.

    2006-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  9. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  10. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  11. Interim Measures Work Plan Expanded Bioventing System SWMU 55 (IRP Site FT-03)

    National Research Council Canada - National Science Library

    1997-01-01

    This interim measures work plan (IMWP) presents the scope for an expanded bioventing system to conduct in situ treatment of the remaining fuel-contaminated soils at solid waste management unit (SWMU...

  12. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  13. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  14. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  15. At the Ready: Planning for Business Continuity

    Science.gov (United States)

    Sharp, Linda

    2011-01-01

    School system leaders never know when disaster may strike. Having a plan in place to protect vital data and systems is crucial. School system leaders need to be actively involved in crisis preparedness, planned response, and recovery to ensure student and staff safety and to make certain that all important operations, services, processes, and…

  16. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  17. Readiness evaluation plan for operation of the 200-ZP-1 pump-and-treat system

    International Nuclear Information System (INIS)

    Lehrschall, R.R.

    1996-03-01

    The Project Readiness Evaluation (RE) process will show that the 200-ZP-1 Phase 2 and Phase 3 Interim Response Measure (IRM) remedial activity is prepared to safely and effectively commence work activities. In order to ensure readiness to commence the 200-ZP-1 Pump-and-Treat (P and T) activities, a formal RE will be performed in accordance with this plan. A Readiness Evaluation Team (RET) will evaluate and confirm readiness by reviewing the work activities and by conducting field verifications. The Project Final Hazard Classification (FHC) prepared for the 200-ZP-1 P and T IRM has determined that the operation is a Non-Nuclear Low Hazard activity. The goal of this IRM is to reduce further migration of the carbon tetrachloride, chloroform, and trichloroethylene (TCE) in the groundwater of the 200 West Area. The Phase 2 and Phase 3 IRM treatment system will be designed to initiate hydraulic containment of the contaminant mass in the high-concentration portion (i.e., the 2,000- to 3,000-ppb contour) of the CCl 4 plume. This system will be located just north of the Plutonium Finishing Plant in the 200 West Area and will utilize air stripping and vapor-phase granular activated carbon (GAC) adsorption of the CCl 4 . Air stripping is performed by forcing clean air through the contaminated groundwater stream. Based on chemical equilibrium, volatile organic compounds are transferred from the groundwater stream into the air stream. The air stream, containing the contamination in vapor phase, will be passed through vapor-phase GAC columns to remove and collect the organic contaminants. Saturated GAC will then be shipped offsite for carbon regeneration, where the contamination will be destroyed at a permitted facility

  18. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  19. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  20. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  1. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  2. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  3. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  4. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  5. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  6. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  7. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  8. Interim Corrective Measures Work Plan for the Expanded Bioventing System Eglin Main Base Old Fire Training Area

    National Research Council Canada - National Science Library

    1997-01-01

    This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA...

  9. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  10. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  11. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    Science.gov (United States)

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  12. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  13. Operations and Maintenance Concept Plan for the Immobilized High-Level Waste (IHLW) Interim Storage Facility

    International Nuclear Information System (INIS)

    JANIN, L.F.

    2000-01-01

    This OandM Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design

  14. Enterprise resource planning: An assessment for readiness to change

    Directory of Open Access Journals (Sweden)

    Ali Ashraf Nazari

    2014-01-01

    Full Text Available This paper presents an empirical investigation for the implementation of enterprise resource planning among 58 production units in province of Ilam, Iran. The proposed study of this paper considers the readiness in terms of six factors including human resources, financial resources, infrastructures, quality control, and information systems and communication technology. Using structural equation modeling, the study examines six hypotheses and the implementation is accomplished on LISREL software package. Cronbach alpha has been calculated as 0.91, which is well above the minimum desirable level. The results of the survey have indicated that all six mentioned factors influence positively on ERP implementation and for a successful implementation of ERP, it is suggested to consider these factors, seriously.

  15. Linear Programming for Vocational Education Planning. Interim Report.

    Science.gov (United States)

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  16. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  18. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Science.gov (United States)

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... and Insurance Oversight, Department of Health and Human Services. ACTION: Interim final rules with...

  19. 75 FR 27121 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Dependent...

    Science.gov (United States)

    2010-05-13

    ... 45 CFR Parts 144, 146, and 147 Group Health Plans and Health Insurance Issuers Relating to Dependent... 144, 146, and 147 RIN 0991-AB66 Interim Final Rules for Group Health Plans and Health Insurance... requirements for group health plans and health insurance issuers in the group and individual markets under...

  20. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  1. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  2. 1998 242-A interim evaporator tank system integrity assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-03-31

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology`s Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem.

  3. 1998 242-A interim evaporator tank system integrity assessment plan

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology's Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem

  4. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-07-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter

  5. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    Science.gov (United States)

    Meer, David W.; Oriti, Salvatore M.

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, GRC has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  6. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  7. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  8. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  9. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  10. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  11. 40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

    International Nuclear Information System (INIS)

    Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

    1989-03-01

    This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs

  12. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  13. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  14. Category 2 and 4 investigation-derived waste readiness evaluation plan

    International Nuclear Information System (INIS)

    Ludowise, J.D.

    1996-08-01

    This Readiness Evaluation Plan presents the methodology used to assess the readiness for loading investigation-derived waste drums on trucks for transport to the Environmental Restoration Disposal Facility. The scope of this plan includes an assessment of the organizations, procedures, and regulatory approvals necessary for the handling of investigation-derived waste containers and the subsequent transportation of materials to the Environmental Restoration Disposal Facility

  15. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  16. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  17. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    International Nuclear Information System (INIS)

    Sweeney, M.D.

    1995-01-01

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations

  18. T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z.F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy's Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  19. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  20. Interim Action Proposed Plan for the old radioactive waste burial ground (643-E)

    International Nuclear Information System (INIS)

    McFalls, S.

    1995-12-01

    This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this IAPP is to describe the preferred interim remedial action for addressing the Old Radioactive Waste Burial Ground (ORWBG) unit located in the Burial Ground Complex (BGC) at the Savannah River Site (SRS) in Aiken, South Carolina. On December 21, 1989, SRS was included on the National Priorities List (NPL). In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), DOE has negotiated a Federal Facility Agreement (FFA, 1993) with EPA and SCDHEC to coordinate remedial activities at SRS. Public participation requirements are listed in Sections 113 and 117 of CERCLA. These requirements include establishment of an Administrative Record File that documents the selection of remedial alternatives and allows for review and comment by the public regarding those alternatives. The SRS Public Involvement Plan (PIP) (DOE, 1994) is designed to facilitate public involvement in the decision-making process for permitting closure, and the selection of remedial alternatives. Section 117(a) of CERCLA, 1980, as amended, requires publication of a notice of any proposed remedial action

  1. Czech interim spent fuel storage facility: operation experience, inspections and future plans

    International Nuclear Information System (INIS)

    Fajman, V.; Bartak, L.; Coufal, J.; Brzobohaty, K.; Kuba, S.

    1999-01-01

    The paper describes the situation in the spent fuel management in the Czech Republic. The interim Spent Fuel Storage Facility (ISFSF) at Dukovany, which was commissioned in January 1997 and is using dual transport and storage CASTOR - 440/84 casks, is briefly described. The authors deal with their experience in operating and inspecting the ISFSF Dukovany. The structure of the basic safety document 'Limits and Conditions of Normal Operation' is also mentioned, including the experience of the performance. The inspection activities focused on permanent checking of the leak tightness of the CASTOR 440/84 casks, the maximum cask temperature and inspections monitoring both the neutron and gamma dose rate as well as the surface contamination. The results of the inspections are mentioned in the presentation as well. The operator's experience with re-opening partly loaded and already dried CASTOR-440/84 cask, after its transport from NPP Jaslovske Bohunice to the NPP Dukovany is also described. The paper introduces briefly the concept of future spent fuel storage both from the NPP Dukovany and the NPP Temelin, as prepared by the CEZ. The preparatory work for the Central Interim Spent Nuclear Fuel Storage Facility (CISFSF) in the Czech Republic and the information concerning the planned storage technology for this facility is discussed in the paper as well. The authors describe the site selection process and the preparatory steps concerning new spent fuel facility construction including the Environmental Impact Assessment studies. (author)

  2. Readiness factors for information system strategic planning among universities in developing countries: a systematic review

    Science.gov (United States)

    Irfan, M.; Putra, S. J.; Alam, C. N.; Subiyakto, A.; Wahana, A.

    2018-03-01

    The implementation of information system strategic planning (ISSP) in higher education institutions is to improve work efficiency, management effectiveness in order to improve organizational competitive advantage. However, the question of whether all universities are ready to implement ISSP as a way to achieve organizational goals has not been answered. This study aims to investigate the readiness phenomena through literature study. The method used is by using the Systematic Literature Review (SLR) instrument to identify readiness factors on the implementation of ISSP, especially among the institutions of higher education in developing countries. This study has identified 10 readiness measurement. There are three categories of measurement, namely people, processes and technologies that represent 11 factors of ISSP readiness measurement in universities.

  3. Sampling and analysis plan for Wayne Interim Storage Site (WISS), Wayne, New Jersey

    International Nuclear Information System (INIS)

    Brown, K.S.; Murray, M.E.; Rodriguez, R.E.

    1998-10-01

    This field sampling plan describes the methodology to perform an independent radiological verification survey and chemical characterization of a remediated area of the subpile at the Wayne Interim Storage Site, Wayne, New Jersey.Data obtained from collection and analysis of systematic and biased soil samples will be used to assess the status of remediation at the site and verify the final radiological status. The objective of this plan is to describe the methods for obtaining sufficient and valid measurements and analytical data to supplement and verify a radiological profile already established by the Project Remediation Management Contractor (PMC). The plan describes the procedure for obtaining sufficient and valid analytical data on soil samples following remediation of the first layer of the subpile. Samples will be taken from an area of the subpile measuring approximately 30 m by 80 m from which soil has been excavated to a depth of approximately 20 feet to confirm that the soil beneath the excavated area does not exceed radiological guidelines established for the site or chemical regulatory limits for inorganic metals. After the WISS has been fully remediated, the Department of Energy will release it for industrial/commercial land use in accordance with the Record of Decision. This plan provides supplemental instructions to guidelines and procedures established for sampling and analysis activities. Procedures will be referenced throughout this plan as applicable, and are available for review if necessary

  4. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... HEALTH AND HUMAN SERVICES Office of Consumer Information and Insurance Oversight 45 CFR Part 147 RIN 0950-AA17 [OCIIO-9991-IFC2] Amendment to the Interim Final Rules for Group Health Plans and Health Insurance... Administration, Department of Labor; Office of Consumer Information and Insurance Oversight, Department of Health...

  5. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  6. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  7. Future Ready Learning: Reimagining the Role of Technology in Education. 2016 National Education Technology Plan

    Science.gov (United States)

    Thomas, Susan

    2016-01-01

    The National Education Technology Plan is the flagship educational technology policy document for the United States. The 2016 Plan, "Future Ready Learning: Reimagining the Role of Technology in Education," articulates a vision of equity, active use, and collaborative leadership to make everywhere, all-the-time learning possible. While…

  8. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants. Interim report

    International Nuclear Information System (INIS)

    1980-01-01

    The purpose of this document is to provide a common reference and interim guidance source for: state and local governments and nuclear facility operators in the development of radiological emergency response plans and preparedness in support of nuclear power plants; and Nuclear Regulatory Commission (NRC), Federal Emergency Management Agency (FEMA) and other Federal agency personnel engaged in the review of state, local government, and licensee plans and preparedness

  9. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  10. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  11. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  12. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  13. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    1991-01-01

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  14. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  15. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  16. Readiness assessment plan for the Radioactive Mixed Waste Land Disposal Facility (Trench 31)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    This document provides the Readiness Assessment Plan (RAP) for the Project W-025 (Radioactive Mixed Waste Land Disposal Facility) Readiness Assessment (RA). The RAP documents prerequisites to be met by the operating organization prior to the RA. The RAP is to be implemented by the RA Team identified in the RAP. The RA Team is to verify the facility's compliance with criteria identified in the RAP. The criteria are based upon the open-quotes Core Requirementsclose quotes listed in DOE Order 5480.31, open-quotes Startup and Restart of Nuclear Facilitiesclose quotes

  17. Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan

    International Nuclear Information System (INIS)

    PRIGNANO, A.L.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure

  18. Readiness review plan for the in situ vitrification demonstration of Seepage Pit 1 in Waste Area Grouping 7

    International Nuclear Information System (INIS)

    1995-05-01

    A treatability study is planned that encompasses the application of in situ vitrification (ISV) to at least two segments of the Oak Ridge National Laboratory Seepage Pit I during the third quarter of fiscal year 1995. Before the treatability study can be initiated, the proposed activity must be subjected to an Operational Readiness Review (ORR). ORR is a structured methodology of determining readiness to proceed as outlined in Martin Marietta Energy Systems, Inc. (Energy Systems), Environmental Restoration Waste Management Procedure ER/C-P1610, which provides Energy Systems organizations assurance that the work to be performed is consistent with management's expectations and that the subject activity is ready to proceed safely. The readiness review plan provides details of the review plan overview and the scope of work to be performed. The plan also identifies individuals and position responsibilities for implementing the activity. The management appointed Readiness Review Board (RRB) has been identified. A Field Readiness Review Team (FRT), a management appointed multidisciplinary group, has been established (1) to evaluate the ISV treatability study, (2) to identify and assemble supporting objective evidences of the readiness to proceed, and (3) to assist the team leader in presenting the evidences to the RRB. A major component of RRB is the formulation of readiness review criteria months before the operation. A comprehensive readiness review tree (a positive logic tree) is included, which identifies the activities required for the development of the readiness criteria. The readiness review tree serves as a tool to prevent the omission of an item that could affect system performance. All deficiencies identified in the review will be determined as prestart findings and must be resolved before the project is permitted to proceed. The final approval of the readiness to proceed will be the decision of RRB

  19. Preparation of waste analysis plans under the Resource Conservation and Recovery Act (Interim guidance)

    International Nuclear Information System (INIS)

    1993-03-01

    This document is organized to coincide with the suggested structure of the actual Waste Analysis Plans (WAP) discussed in the previous section. The contents of the remaining eleven chapters and appendices that comprise this document are described below: Chapter 2 addresses waste streams, test parameters, and rationale for sampling and analytical method selection; test methods for analyzing parameters; proceduresfor collecting representative samples; and frequency of sample collection and analyses. These are the core WAP requirements. Chapter 3 addresses analysis requirements for waste received from off site. Chapter 4addresses additional requirements for ignitable, reactive, or incompatible wastes. Chapter 5 addresses unit-specific requirements. Chapter 6 addresses special procedures for radioactive mixed waste. Chapter 7 addresses wastes subject to the land disposal restrictions. Chapter 8 addresses QA/QC procedures. Chapter 9 compares the waste analysis requirements of an interim status facility with those of a permitted facility. Chapter 10 describes the petition process required for sampling and analytical procedures to deviate from accepted methods, such as those identified in promulgated regulations. Chapter 11 reviews the process for modification of WAPs as waste type or handling practices change at a RCRA permitted TSDF. Chapter 12 is the list of references that were used in the preparation of this guidance. Appendix A is a sample WAP addressing physical/chemical treatment and container storage. Appendix B is a sample WAP addressing an incinerator and tank systems. Appendix C discusses the relationship of the WAP to other permitting requirements and includes specific examples of how waste analysis is used to comply with certain parts of a RCRA permit. Appendix D contains the exact wording for the notification/certification requirements under theland disposal restrictions

  20. Readiness plan, Hanford 300 Area Treated Effluent Disposal Facility: Revision 1

    International Nuclear Information System (INIS)

    Storm, S.J.

    1994-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is designed for the collection, treatment, and eventual disposal of liquid waste from the 300 Area Process Sewer (PS) system. The PS currently discharges water to the 300 Area Process Trenches. Facilities supported total 54 buildings, including site laboratories, inactive buildings, and support facilities. Effluent discharges to the process sewer from within these facilities include heating, ventilation, and air conditioning systems, heat exchangers, floor drains, sinks, and process equipment. The wastewaters go through treatment processes that include iron coprecipitation, ion exchange and ultraviolet oxidation. The iron coprecipitation process is designed to remove general heavy metals. A series of gravity filters then complete the clarification process by removing suspended solids. Following the iron coprecipitation process is the ion exchange process, where a specific resin is utilized for the removal of mercury. The final main unit operation is the ultraviolet destruction process, which uses high power ultraviolet light and hydrogen peroxide to destroy organic molecules. The objective of this readiness plan is to provide the method by which line management will prepare for a Readiness Assessment (RA) of the TEDF. The self-assessment and RA will assess safety, health, environmental compliance and management readiness of the TEDF. This assessment will provide assurances to both WHC and DOE that the facility is ready to start-up and begin operation

  1. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  2. Readiness to participate in advance care planning: A qualitative study of renal failure patients, families and healthcare providers.

    Science.gov (United States)

    Hutchison, Lauren A; Raffin-Bouchal, Donna S; Syme, Charlotte A; Biondo, Patricia D; Simon, Jessica E

    2017-09-01

    Objectives Advance care planning is the process by which people reflect upon their wishes and values for healthcare, discuss their choices with family and friends and document their wishes. Readiness represents a key predictor of advance care planning participation; however, the evidence for addressing readiness is scarce within the renal failure context. Our objectives were to assess readiness for advance care planning and barriers and facilitators to advance care planning uptake in a renal context. Methods Twenty-five participants (nine patients, nine clinicians and seven family members) were recruited from the Southern Alberta Renal Program. Semi-structured interviews were recorded, transcribed and then analyzed using interpretive description. Results Readiness for advance care planning was driven by individual values perceived by a collaborative encounter between clinicians and patients/families. If advance care planning is not valued, then patients/families and clinicians are not ready to initiate the process. Patients and clinicians are delaying conversations until "illness burden necessitates," so there is little "advance" care planning, only care planning in-the-moment closer to the end of life. Discussion The value of advance care planning in collaboration with clinicians, patients and their surrogates needs reframing as an ongoing process early in the patient's illness trajectory, distinguished from end-of-life decision making.

  3. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  4. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  5. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  6. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  7. Ready, set, stop: mismatch between self-care beliefs, transition readiness skills, and transition planning among adolescents, young adults, and parents.

    Science.gov (United States)

    Sawicki, Gregory S; Kelemen, Skyler; Weitzman, Elissa R

    2014-10-01

    Health care transition (HCT) from pediatric to adult-focused systems is a key milestone for youth. Developing self-care skills and HCT planning are key elements. In a survey at 4 pediatric specialty clinics to 79 youth aged 16 to 25 years and 52 parents, skill-based HCT readiness was assessed using the Transition Readiness Assessment Questionnaire (TRAQ). Multivariable logistic regression evaluated the association between TRAQ scores and self-care beliefs. In all, 70% of youth and 67% of parents believed that they/their child could manage their care. Only 38% of youth and 53% of parents reported thinking about HCT; only 18% of youth and 27% of parents reported having a HCT plan. Youth with higher TRAQ scores were more likely to believe they could manage their care, controlling for age and gender (adjusted odds ratio = 4.0, 95% confidence interval = 1.7-9.5). Transition readiness skills are associated with self-care beliefs. However, a mismatch exists between high reported self-care beliefs and low levels of transition planning. © The Author(s) 2014.

  8. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    International Nuclear Information System (INIS)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs

  9. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  10. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  11. Savannah River Site FY 1998 Spent Nuclear Fuel Interim Management Plan

    International Nuclear Information System (INIS)

    Dupont, M.E.

    1998-01-01

    This document has been prepared to present in one place the near and long-term plans for safe management of Savannah River Site (SRS) spent nuclear fuel inventories until final disposition has been identified and implemented. The activities described are consistent with FY 1998 Annual Operational Plan guidance and with the December 1997 SRS Accelerated Cleanup Plan update. Summarized are highlights, key decision dates, and baseline assumptions of this plan

  12. Interim status of closure/post-closure plan for 183-H solar evaporation basins

    International Nuclear Information System (INIS)

    1988-03-01

    This report describes a plan for decommissioning several solar evaporation basins on the Hanford reservation. The document describes procedures for sampling during decommissioning and a plan for certification of the resulting completed landfill. Additional plans deal with the training, security of the site, and post-closure monitoring

  13. DOE Zero Energy Ready Home Case Study: New Town Builders — The ArtiZEN Plan, Denver, CO

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    The Grand Winner in the Production Builder category of the 2014 Housing Innovation Awards, this builder plans to convert all of its product lines to DOE Zero Energy Ready Home construction by the end of 2015. This home achieves HERS 38 without photovoltaics (PV) and HERS -3 with 8.0 kW of PV.

  14. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1989-01-01

    This document is the sixth annual report on plans for providing FIS capacity. References are made to the first, second, third, fourth, and fifth annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described. 21 refs., 1 fig., 1 tab

  15. How countries link REDD+ interventions to drivers in their readiness plans: implications for monitoring systems

    International Nuclear Information System (INIS)

    Salvini, G; Herold, M; De Sy, V; Kissinger, G; Brockhaus, M; Skutsch, M

    2014-01-01

    Countries participating in the REDD+ scheme are in the readiness phase, designing policy interventions to address drivers of deforestation and forest degradation (DD). In order for REDD+ interventions to be effective, it is essential that they take into account the specific drivers that they aim to address. Moreover it is crucial to design systems that monitor the effectiveness of the planned interventions. In this article we provide a comprehensive and comparative assessment of interventions proposed by 43 REDD+ countries in 98 readiness documents. We summarize the types of interventions and assess if they are formulated referring to the drivers of DD that they are aiming to address. Based on this assessment we consider the implications for systems for monitoring effectiveness of proposed interventions. Most countries reviewed link proposed interventions to specific drivers of DD. The majority of the countries making this link have better driver data quality, in particularly those that present their data in ratio or ordinal terms. Proposed interventions focus not only on activities to reduce deforestation, but also on other forest related REDD+ activities such as sustainable forest management, which reduce forest degradation and enhance forest stocks. Moreover, driver-specific interventions often relate to drivers not only inside but also outside the forest sector. Hence we suggest that monitoring systems need to assess not only deforestation rates through remote sensing, but also degradation and other carbon stock changes within the forest, using more detailed ground level surveys and measurements. In addition, the performance of interventions outside the forest need to be monitored, even if the impacts of these cannot be linked to specific changes in forest carbon stock in specific locations. (paper)

  16. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  17. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  18. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    International Nuclear Information System (INIS)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991

  19. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  20. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  1. Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1

    International Nuclear Information System (INIS)

    Williams, Bruce A.

    2003-01-01

    During 2003, the upgradient well 299-W26-7 went dry and one new groundwater monitoring well was installed downgradient (well 299-W26-14) of the 216-S-10 pond and ditch. This ICN updates the groundwater monitoring wells for the 216-S-10 pond and ditch and adds a revised well location map to the plan

  2. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  3. River Protection Project (RPP) Immobilized High-Level Waste (HLW) Interim Storage Plan

    International Nuclear Information System (INIS)

    BRIGGS, M.G.

    2000-01-01

    This document replaces HNF-1751, Revision 1. It incorporates updates to reflect changes in programmatic direction associated with the vitrification plant contract and associated DOE-ORP guidance. In addition it includes planning associated with failed/used melter and sample handling and disposition work scope. The document also includes format modifications and section numbering update consistent with CH2M HILL Hanford Group, Inc. procedures

  4. Interim remedial action work plan for the cesium plots at Waste Area Grouping 13 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-07-01

    This remedial action work plan (RAWP) is issued under the Federal Facility Agreement to provide a basic approach for implementing the interim remedial action (IRA) described in Interim Record of Decision for the Oak Ridge National Laboratory Waste Area Grouping 13 Cesium Plots, Oak Ridge, Tennessee. This RAWP summarizes the interim record of decision (IROD) requirements and establishes the strategy for the implementation of the field activities. As documented in the IROD document, the primary goal of this action is to reduce the risk to human health and the environment resulting from current elevated levels of gamma radiation on the site and at areas accessible to the public adjacent to the site. The major steps of this IRA are to: Excavate cesium-contaminated soil; place the excavated soils in containers and transport to Waste Area Grouping (WAG) 6; and backfill excavated plots with clean fill materials. The actual remedial action will be performed by Department of Energy prime contractor, MK-Ferguson of Oak Ridge Company. Remediation of the cesium plots will require approximately 60 days to complete. During this time, all activities will be performed according to this RAWP and the applicable specifications, plans, and procedures referred to in this document. The IRA on WAG 13 will prevent a known source of cesium-contaminated soil from producing elevated levels of gamma radiation in areas accessible to the public, eliminate sources of contamination to the environment, and reduce the risks associated with surveillance and maintenance of the WAG 13 site

  5. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  6. Maximum inflation of the type 1 error rate when sample size and allocation rate are adapted in a pre-planned interim look.

    Science.gov (United States)

    Graf, Alexandra C; Bauer, Peter

    2011-06-30

    We calculate the maximum type 1 error rate of the pre-planned conventional fixed sample size test for comparing the means of independent normal distributions (with common known variance) which can be yielded when sample size and allocation rate to the treatment arms can be modified in an interim analysis. Thereby it is assumed that the experimenter fully exploits knowledge of the unblinded interim estimates of the treatment effects in order to maximize the conditional type 1 error rate. The 'worst-case' strategies require knowledge of the unknown common treatment effect under the null hypothesis. Although this is a rather hypothetical scenario it may be approached in practice when using a standard control treatment for which precise estimates are available from historical data. The maximum inflation of the type 1 error rate is substantially larger than derived by Proschan and Hunsberger (Biometrics 1995; 51:1315-1324) for design modifications applying balanced samples before and after the interim analysis. Corresponding upper limits for the maximum type 1 error rate are calculated for a number of situations arising from practical considerations (e.g. restricting the maximum sample size, not allowing sample size to decrease, allowing only increase in the sample size in the experimental treatment). The application is discussed for a motivating example. Copyright © 2011 John Wiley & Sons, Ltd.

  7. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, South Walnut Creek Basin, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1991-01-01

    Volume 2 of this IM/IRA Plan contains OU 2 surface water, sediment, ground water and soil chemistry data, as well as the South Walnut Creek Basin Surface Water IM/IRA schedule and a tabulation of ARARs. (FL)

  8. How countries link REDD+ interventions to drivers in their readiness plans: implications for monitoring systems

    NARCIS (Netherlands)

    Salvini, G.; Herold, M.; Sy, de V.; Kissinger, G.M.; Brockhouse, M.; Skutsch, M.

    2014-01-01

    Countries participating in the REDD+ scheme are in the readiness phase, designing policy interventions to address drivers of deforestation and forest degradation (DD). In order for REDD+ interventions to be effective, it is essential that they take into account the specific drivers that they aim to

  9. An Investigation of Mobile Learning Readiness in Higher Education Based on the Theory of Planned Behavior

    Science.gov (United States)

    Cheon, Jongpil; Lee, Sangno; Crooks, Steven M.; Song, Jaeki

    2012-01-01

    This study investigated the current state of college students' perceptions toward mobile learning in higher education. Mobile learning is a new form of learning utilizing the unique capabilities of mobile devices. Although mobile devices are ubiquitous on college campuses, student readiness for mobile learning has yet to be fully explored in the…

  10. Community Mobilization and Readiness: Planning Flaws which Challenge Effective Implementation of 'Communities that Care' (CTC) Prevention System.

    Science.gov (United States)

    Basic, Josipa

    2015-01-01

    This article reviews the experience of implementing a community approach to drug use and youth delinquency prevention based on the 'Communities that Care' (CTC) system implemented in one Croatian county consisting of 12 communities, 2002 to 2013 (Hawkins, 1999; Hawkins & Catalano, 2004). This overview explores selected critical issues which are often not considered in substance use(r) community intervention planning, implementation as well as in associated process and outcome assessments. These issues include, among others, the mobilization process of adequate representation of people; the involvement of relevant key individual and organizational stakeholders and being aware of the stakeholders' willingness to participate in the prevention process. In addition, it is important to be aware of the stakeholders' knowledge and perceptions about the 'problems' of drug use and youth delinquency in their communities as well as the characteristics of the targeted population(s). Sometimes there are community members and stakeholders who block needed change and therefore prevention process enablers and 'bridges' should be involved in moving prevention programming forward. Another barrier that is often overlooked in prevention planning is community readiness to change and a realistic assessment of available and accessible resources for initiating the planned change(s) and sustaining them. All of these issues have been found to be potentially related to intervention success. At the end of this article, I summarize perspectives from prevention scientists and practitioners and lessons learned from communities' readiness research and practice in Croatian that has international relevance.

  11. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  12. Interim guidance on the Standard Review Plan for the review of financial assurance mechanisms for decommissioning under 10 CFR Parts 30, 40, and 70

    International Nuclear Information System (INIS)

    1988-12-01

    Interim Guidance on the Standard Review Plan (SRP) for the Review of Financial Assurance Mechanisms for Decommissioning under 10 CFR Parts 30, 40, and 70 is prepared for the guidance of Nuclear Regulatory Commission staff reviewers in performing reviews of applications from material licensees affected by the decommissioning regulations established June 27, 1988 (53FR24018). The principal purpose of the SRP is to assure the quality and uniformity of staff reviews and to present a base from which to evaluate the financial assurance aspects of the applications. NUREG-1337, identifies who performs the review, the matters that are reviewed, the basis of the review, how the review is performed, and the conclusions that are sought. 3 refs

  13. DOE Zero Energy Ready Home Case Study: Thrive Home Builders, Lowry Plan

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2017-09-01

    Thrive Home Builders built this 4,119-ft2 home at the Lowry development in Denver, Colorado, to the high-performance criteria of the U.S. Department of Energy’s Zero Energy Ready Home Program. Despite the dense positioning of the homes, mono-plane roof designs afforded plenty of space for the 8.68 kW of photovoltaic panels. With the PV, the home achieves a Home Energy Rating System (HERS) score of 4 and the home owners should enjoy energy bills of about $-11 a year. Without the PV, the home would score a HERS 38 (far lower than the HERS 80 to 100 of typical new homes).

  14. A planning model with a solution algorithm for ready mixed concrete production and truck dispatching under stochastic travel times

    Science.gov (United States)

    Yan, S.; Lin, H. C.; Jiang, X. Y.

    2012-04-01

    In this study the authors employ network flow techniques to construct a systematic model that helps ready mixed concrete carriers effectively plan production and truck dispatching schedules under stochastic travel times. The model is formulated as a mixed integer network flow problem with side constraints. Problem decomposition and relaxation techniques, coupled with the CPLEX mathematical programming solver, are employed to develop an algorithm that is capable of efficiently solving the problems. A simulation-based evaluation method is also proposed to evaluate the model, coupled with a deterministic model, and the method currently used in actual operations. Finally, a case study is performed using real operating data from a Taiwan RMC firm. The test results show that the system operating cost obtained using the stochastic model is a significant improvement over that obtained using the deterministic model or the manual approach. Consequently, the model and the solution algorithm could be useful for actual operations.

  15. Data management implementation plan for interim action at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The Gunite and Associated Tanks (GAAT) Project is currently conducting a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Remedial Action to reduce uncertainties on the potential cost and effectiveness of remote tank cleaning equipment being produced jointly between the US Department of Energy (DOE); Oak Ridge National Laboratory (ORNL); Lockheed Martin Energy Systems, Inc.; and associated subcontractors with the DOE EM-50 Program. The goal of this document is to ensure that all procedures have been followed to provide reliable, verifiable data that are technically defensible. The data collected will be used to support closure of the tanks, compare the expected versus actual waste volume and curies to aid in conducting operations, and verify the performance of developmental equipment

  16. The Art of Capacity Planning Being Ready for the Big Growth Spurt

    CERN Document Server

    Allspaw, John

    2009-01-01

    Web-based companies live or die by the ability to scale their infrastructure to accommodate increasing demand. This book is a hands-on and practical guide to planning for such growth, with many techniques and considerations to help you plan, deploy, and manage web application infrastructure. Written by the manager of data operations for the world-famous photo-sharing site Flickr.com, the author offers advice based on years of valuable experience.

  17. 75 FR 41726 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Coverage of...

    Science.gov (United States)

    2010-07-19

    ... Health Plans and Health Insurance Issuers Relating to Coverage of Preventive Services Under the Patient... and health insurance coverage in the group and individual markets under provisions of the Patient... plans and group health insurance issuers for plan years beginning on or after September 23, 2010. These...

  18. Determinants of facility readiness for integration of family planning with HIV testing and counseling services: evidence from the Tanzania service provision assessment survey, 2014-2015.

    Science.gov (United States)

    Bintabara, Deogratius; Nakamura, Keiko; Seino, Kaoruko

    2017-12-22

    Global policy reports, national frameworks, and programmatic tools and guidance emphasize the integration of family planning and HIV testing and counseling services to ensure universal access to reproductive health care and HIV prevention. However, the status of integration between these two services in Tanzanian health facilities is unclear. This study examined determinants of facility readiness for integration of family planning with HIV testing and counseling services in Tanzania. Data from the 2014-2015 Tanzania Service Provision Assessment Survey were analyzed. Facilities were considered ready for integration of family planning with HIV testing and counseling services if they scored ≥ 50% on both family planning and HIV testing and counseling service readiness indices as identified by the World Health Organization. All analyses were adjusted for clustering effects, and estimates were weighted to correct for non-responses and disproportionate sampling. Descriptive, bivariate, and multivariate logistic regression analyses were performed. A total of 1188 health facilities were included in the study. Of all of the health facilities, 915 (77%) reported offering both family planning and HIV testing and counseling services, while only 536 (45%) were considered ready to integrate these two services. Significant determinants of facility readiness for integrating these two services were being government owned [AOR = 3.2; 95%CI, 1.9-5.6], having routine management meetings [AOR = 1.9; 95%CI, 1.1-3.3], availability of guidelines [AOR = 3.8; 95%CI, 2.4-5.8], in-service training of staff [AOR = 2.6; 95%CI, 1.3-5.2], and availability of laboratories for HIV testing [AOR = 17.1; 95%CI, 8.2-35.6]. The proportion of facility readiness for the integration of family planning with HIV testing and counseling in Tanzania is unsatisfactory. The Ministry of Health should distribute and ensure constant availability of guidelines, availability of rapid diagnostic

  19. Complete self-sufficiency planning: designing and building disaster-ready hospitals.

    Science.gov (United States)

    Brands, Chad K; Hernandez, Raquel G; Stenberg, Arnold; Carnes, Gary; Ellen, Jonathan; Epstein, Michael; Strouse, Timothy

    2013-01-01

    The need for healthcare systems and academic medical centers to be optimally prepared in the event of a disaster is well documented. Events such as Hurricane Katrina demonstrate a major gap in disaster preparedness for at-risk medical institutions. To address this gap, we outline the components of complete self-sufficiency planning in designing and building hospitals that will function at full operational capacity in the event of a disaster. We review the processes used and outcomes achieved in building a new critical access, freestanding children's hospital in Florida. Given that hurricanes are the most frequently occurring natural disaster in Florida, the executive leadership of our hospital determined that we should be prepared for worst-case scenarios in the design and construction of a new hospital. A comprehensive vulnerability assessment was performed. A building planning process that engaged all of the stakeholders was used during the planning and design phases. Subsequent executive-level review and discussions determined that a disaster would require the services of a fully functional hospital. Lessons learned from our own institution's previous experiences and those of medical centers involved in the Hurricane Katrina disaster were informative and incorporated into an innovative set of hospital design elements used for construction of a new hospital with full operational capacity in a disaster. A freestanding children's hospital was constructed using a new framework for disaster planning and preparedness that we have termed complete self-sufficiency planning. We propose the use of complete self-sufficiency planning as a best practice for disaster preparedness in the design and construction of new hospital facilities.

  20. BE (fuel element)/ZL (interim storage facility) module. Constituents of the fuel BE data base for BE documentation with respect to the disposal planning and the support of the BE container storage administration

    International Nuclear Information System (INIS)

    Hoffmann, V.; Deutsch, S.; Busch, V.; Braun, A.

    2012-01-01

    The securing of spent fuel element disposal from German nuclear power plants is the main task of GNS. This includes the container supply and the disposal analysis and planning. Therefore GNS operates a data base comprising all in Germany implemented fuel elements and all fuel element containers in interim storage facilities. With specific program modules the data base serves an optimized repository planning for all spent fuel elements from German NPPS and the supply of required data for future final disposal. The data base has two functional models: the BE (fuel element) and the ZL (interim storage) module. The contribution presents the data structure of the modules and details of the data base operation.

  1. Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

    Science.gov (United States)

    Whitney L. Morrison; Daprato, Rebecca C.

    2016-01-01

    This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

  2. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  3. Proposal of performance indicators/model for Operational Readiness Verification (ORV) at restart after a planned shutdown

    International Nuclear Information System (INIS)

    Hollnagel, Erik; Nygren, Magnus

    2005-12-01

    The objectives of the study reported here were to propose a model that can be used in the analysis of possible future ORV-related events and to outline a set of performance indicators that can be used by the inspectorate to assess a utility's level of readiness if an ORV-event should take place. Together the two objectives serve to improve the inspectorate's ability to ensure that the utilities maintain an adequate capability to respond. The background for the current study is the nine ORV events that occurred in Sweden between 1995- 1998, as well as the findings of a previous study of safety during outage and restart of nuclear power plants project. This study found that the three levels or types of tests that occur in ORV were used according to need rather than according to a predefined arrangement or procedure, and that tasks were adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. The organisation's coping with the complexity of ORV was discussed by the relation between expectations and surprises, how planning was used as control, attention to details, and the practices of shift changes. It is a truism that accidents are analysed and interpreted relative to a commonly accepted understanding of their nature. This understanding is, however, relative rather than absolute, and has changed significantly during the last decade. In the 1990s, accidents were analysed step by step, and explanations and recommendations therefore emphasised specific rather than generic solutions. The present study illustrates this by going through the responses to the nine ORV events. Following that, the nine events are analysed anew using a contemporary understanding of accidents (a systemic model), which emphasises that incidents more often arise from context induced performance variability than from failures of people. The alternative interpretation provided by a systemic model is illustrated by a detailed analysis of

  4. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  5. Removal Action Work Plan for 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Morton, M.R.

    2000-01-01

    This document contains the removal action work plan for the 105-DR and 105-F Reactor buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site, which is owned and operated by the US Department of Energy (DOE), in Benton County, Washington. The 100 Areas (including the 100-D/DR and 100-F Areas) of the Hanford Site were placed on the US Environmental Protection Agency's (EPA's) National Priorities List under the ''Comprehensive Environmental Response, Compensation, and Liability Act of 1980'' (CERCLA). The DOE has determined that hazardous substances in the 105-DR and 105-F Reactor buildings and four ancillary facilities present a potential threat to human health or the environment. The DOE has also determined that a non-time critical removal action is warranted at these facilities. Alternatives for conducting a non-time critical removal action were evaluated in the ''Engineering Evaluation/Cost Analysis for the 105-DR and 105-F Reactor Facilities and Ancillary Facilities'' (DOE-RL 1998a). The engineering evaluation/cost analysis (EE/CA) resulted in the recommendation to decontaminate and demolish the contaminated reactor buildings (except for the reactor blocks) and the ancillary facilities and to construct a safe storage enclosure (SSE) over the reactor blocks. The recommendation was approved in an action memorandum (Ecology et al. 1998) signed by the Washington State Department of Ecology (Ecology), EPA, and DOE. The DOE is the agency responsible for implementing the removal actions in the 105-D/DR and 105-F Areas. Ecology is the lead regulatory agency for facilities in the 100-D/DR Area, and EPA is the lead regulatory agency for facilities in the 100-F Area. The term ''lead regulator agency'' hereinafter, refers to these authorities. This removal action work plan supports implementation of the non-time critical removal action

  6. Sampling and analysis plan for the gunite and associated tanks interim remedial action, wall coring and scraping at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This Sampling and Analysis Plan documents the procedures for collecting and analyzing wall core and wall scraping samples from the Gunite and Associated Tanks. These activities are being conducted to support the Comprehensive Environmental Response, Compensation, and Liability Act at the gunite and associated tanks interim remedial action at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The sampling and analysis activities will be performed in concert with sludge retrieval and sluicing of the tanks. Wall scraping and/or wall core samples will be collected from each quadrant in each tank by using a scraping sampler and/or a coring drill deployed by the Houdini robot vehicle. Each sample will be labeled, transported to the Radioactive Materials Analytical Laboratory, and analyzed for physical and radiological characteristics, including total activity, gross alpha, gross beta, radioactive strontium and cesium, and other alpha- and gamma-emitting radionuclides. The data quality objectives process, based on US Environmental Protection Agency guidance, was applied to identify the objectives of this sampling and analysis. The results of the analysis will be used to (1) validate predictions of a strontium concrete diffusion model, (2) estimate the amount of radioactivity remaining in the tank shells, (3) provide information to correlate with measurements taken by the Gunite Tank Isotope Mapping Probe and the Characterization End Effector, and (4) estimate the performance of the wall cleaning system. This revision eliminates wall-scraping samples from all tanks, except Tank W-3. The Tank W-3 experience indicated that the wall scrapper does not collect sufficient material for analysis

  7. Engineering and planning for reactor 105-C interim safe storage project subcontract no. 0100C-SC-G0001 conceptual design report. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The 105-C Reactor, one of eight surplus production reactors at the Hanford Site, has been proposed by the U.S. Department of Energy, Richland, Operations Office to be the first large-scale technology demonstration project in the decontamination and decommissioning (D ampersand D) focus area as part of the project for dismantlement and interim safe storage. The 105-C Reactor will be placed in an interim safe storage condition, then undergo the decontamination and decommissioning phase. After D ampersand D, the reactor will be placed in long- term safe storage. This report provides the conceptual design for these activities

  8. Defining a New North Star: Aligning Local Control Accountability Plans to College and Career Readiness. Policy Brief

    Science.gov (United States)

    Beach, Paul; Thier, Michael; Lench, Sarah Collins; Coleman, Matt

    2015-01-01

    Educators have the increasingly difficult task of preparing students to live, learn, and work in the 21st century. Amidst those challenges, a growing body of research suggests that college and career readiness depends upon students' ability to think critically, learn how to learn, communicate, and collaborate. The No Child Left Behind (NCLB) era…

  9. Cognitive Readiness

    National Research Council Canada - National Science Library

    Morrison, John

    2002-01-01

    Cognitive readiness is described as the mental preparation an individual needs to establish and sustain competent performance in the complex and unpredictable environment of modern military operations...

  10. An Examination of the Department of Defense Financial Improvement and Audit Readiness Plan Using a Balanced Scorecard

    Science.gov (United States)

    2011-06-01

    BEIS Business Enterprise Information Services BEP Business Enterprise Priorities BMMP Business Management Modernization Program BTA Business...Scorecard framework . Initially published in December 2005, the FIAR is the DoD’s strategy towards achieving audit readiness. The FIAR provides a timeline and...Secretary of Defense Comptroller, n.d.). The Balanced Scorecard, a strategic management framework developed in 1987 by Arthur Schneiderman and popularized

  11. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  12. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  13. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    International Nuclear Information System (INIS)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  14. Vismodegib in patients with advanced basal cell carcinoma (STEVIE): a pre-planned interim analysis of an international, open-label trial.

    Science.gov (United States)

    Basset-Seguin, Nicole; Hauschild, Axel; Grob, Jean-Jacques; Kunstfeld, Rainer; Dréno, Brigitte; Mortier, Laurent; Ascierto, Paolo A; Licitra, Lisa; Dutriaux, Caroline; Thomas, Luc; Jouary, Thomas; Meyer, Nicolas; Guillot, Bernard; Dummer, Reinhard; Fife, Kate; Ernst, D Scott; Williams, Sarah; Fittipaldo, Alberto; Xynos, Ioannis; Hansson, Johan

    2015-06-01

    The Hedgehog pathway inhibitor vismodegib has shown clinical benefit in patients with advanced basal cell carcinoma and is approved for treatment of patients with advanced basal cell carcinoma for whom surgery is inappropriate. STEVIE was designed to assess the safety of vismodegib in a situation similar to routine practice, with a long follow-up. In this multicentre, open-label trial, adult patients with histologically confirmed locally advanced basal cell carcinoma or metastatic basal cell carcinoma were recruited from regional referral centres or specialist clinics. Eligible patients were aged 18 years or older with an Eastern Cooperative Oncology Group (ECOG) performance status of 0-2, and adequate organ function. Patients with locally advanced basal cell carcinoma had to have been deemed ineligible for surgery. All patients received 150 mg oral vismodegib capsules once a day on a continuous basis in 28-day cycles. The primary objective was safety (incidence of adverse events until disease progression or unacceptable toxic effects), with assessments on day 1 of each treatment cycle (28 days) by principal investigator and coinvestigators at the site. Efficacy variables were assessed as secondary endpoints. The safety evaluable population included all patients who received at least one dose of study drug. Patients with histologically confirmed basal cell carcinoma who received at least one dose of study drug were included in the efficacy analysis. An interim analysis was pre-planned after 500 patients achieved 1 year of follow-up. This trial is registered with ClinicalTrials.gov, number NCT01367665. The study is still ongoing. Between June 30, 2011, and Nov 6, 2014, we enrolled 1227 patients. At clinical cutoff (Nov 6, 2013), 499 patients (468 with locally advanced basal cell carcinoma and 31 with metastatic basal cell carcinoma) had received study drug and had the potential to be followed up for 12 months or longer. Treatment was discontinued in 400 (80

  15. K-Reactor readiness

    International Nuclear Information System (INIS)

    Rice, P.D.

    1991-01-01

    This document describes some of the more significant accomplishments in the reactor restart program and details the magnitude and extent of the work completed to bring K-Reactor to a state of restart readiness. The discussion of restart achievements is organized into the three major categories of personnel, programs, and plant. Also presented is information on the scope and extent of internal and external oversight of the efforts, as well as some details on the startup plan

  16. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  17. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  18. Determining Distance Education Students' Readiness for Mobile Learning at University of Ghana Using the Theory of Planned Behavior

    Science.gov (United States)

    Tagoe, Michael Ayitey; Abakah, Ellen

    2014-01-01

    The use of mobile technologies in the classroom is transforming teaching and learning in higher institutions. This study investigated University of Ghana Distance Education students' perceptions toward mobile learning. The paper using the theory of planned behaviour (TPB) explained how students' beliefs influenced students' intention to adopt…

  19. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  20. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  1. Film based verification of calculation algorithms used for brachytherapy planning-getting ready for upcoming challenges of MBDCA

    Directory of Open Access Journals (Sweden)

    Grzegorz Zwierzchowski

    2016-08-01

    Full Text Available Purpose: Well-known defect of TG-43 based algorithms used in brachytherapy is a lack of information about interaction cross-sections, which are determined not only by electron density but also by atomic number. TG-186 recommendations with using of MBDCA (model-based dose calculation algorithm, accurate tissues segmentation, and the structure’s elemental composition continue to create difficulties in brachytherapy dosimetry. For the clinical use of new algorithms, it is necessary to introduce reliable and repeatable methods of treatment planning systems (TPS verification. The aim of this study is the verification of calculation algorithm used in TPS for shielded vaginal applicators as well as developing verification procedures for current and further use, based on the film dosimetry method. Material and methods : Calibration data was collected by separately irradiating 14 sheets of Gafchromic® EBT films with the doses from 0.25 Gy to 8.0 Gy using HDR 192Ir source. Standard vaginal cylinders of three diameters were used in the water phantom. Measurements were performed without any shields and with three shields combination. Gamma analyses were performed using the VeriSoft® package. Results : Calibration curve was determined as third-degree polynomial type. For all used diameters of unshielded cylinder and for all shields combinations, Gamma analysis were performed and showed that over 90% of analyzed points meets Gamma criteria (3%, 3 mm. Conclusions : Gamma analysis showed good agreement between dose distributions calculated using TPS and measured by Gafchromic films, thus showing the viability of using film dosimetry in brachytherapy.

  2. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  3. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  4. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  5. The concept of readiness to change.

    Science.gov (United States)

    Dalton, Cindy C; Gottlieb, Laurie N

    2003-04-01

    Readiness is associated with change, yet there is little understanding of this construct. The purpose of this study was to examine readiness; its referents, associated factors and the resulting consequences. In the course of nursing five clients living with multiple sclerosis over a 7-month period using a Reflective Practice Model, data were systematically gathered using open-ended and then more focused questioning. Data collected during 42 client encounters (28 face-to-face encounters; 14 telephone contacts) were analysed using Chinn and Kramer's concept analysis technique. Findings. The concept of readiness was inductively derived. Readiness is both a state and a process. Before clients can create change they need to become ready to change. A number of factors trigger readiness. These include when: (a) clients perceive that a health concern is not going to resolve, (b) a change in a client's physical condition takes on new significance, (c) clients feel better able to manage their stress, (d) clients have sufficient energy, (e) clients perceive that they have adequate support in undertaking change. When one or more of these factors is present clients become ready to consider change. The process of readiness involves recognizing the need to change, weighing the costs and benefits and, when benefits outweigh costs, planning for change. The desire to change and to take action determines clients' degree of readiness. When they experience a high degree of readiness they report less anger, less depression, and view their condition in a more positive light. In contrast, when they experience a low degree of readiness they report feeling depressed, afraid and vulnerable in the face of change. Nursing has an important role to play in creating conditions to support change. To fulfil this role, nurses need to be able to assess readiness for change and the factors that enable it and then to intervene in ways that facilitate readiness.

  6. Proposed Plan for Interim Remedial Actions at the 100-NR-1 Source Sites Operable Unit and the 100-NR-2 Groundwater Operable Unit

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1998-02-01

    This Proposed Plan summary includes brief descriptions of the key issues for the 100-N Area contaminated soil and groundwater. This summary is intended as a simplified introduction to readers who might not be familiar with the contaminated site cleanup process or Hanford Site issues. The detailed Proposed Plan is attached to this summary. Some of the buildings and surrounding soils in the 100 Area of the Hanford Site were contaminated during operation of the nuclear reactors. The contamination poses a potential threat to public health and/or the environment. The potential threat to the public is exposure to people on or near the site to radiation and chemicals. The potential threat to the environment is contamination in the soil that has migrated to the groundwater and could eventually harm the Columbia River. Because of these potential threats, the Federal Government decided that the 100 Area was a high priority for cleanup and placed it on the National Priorities List

  7. Magnetic fusion: Environmental Readiness Document

    International Nuclear Information System (INIS)

    1981-03-01

    Environmental Readiness Documents are prepared periodically to review and evaluate the environmental status of an energy technology during the several phases of development of that technology. Through these documents, the Office of Environment within the Department of Energy provides an independent and objective assessment of the environmental risks and potential impacts associated with the progression of the technology to the next stage of development and with future extensive use of the technology. This Environmental Readiness Document was prepared to assist the Department of Energy in evaluating the readiness of magnetic fusion technology with respect to environmental issues. An effort has been made to identify potential environmental problems that may be encountered based upon current knowledge, proposed and possible new environmental regulations, and the uncertainties inherent in planned environmental research

  8. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  9. Guidelines for interim storage of low level waste

    International Nuclear Information System (INIS)

    Hornibrook, C.; Castagnacci, A.; Clymer, G.; Kelly, J.; Naughton, M.; Saunders, P.; Stoner, P.; Walker, N.; Cazzolli, R.; Dettenmeier, R.; Loucks, L.; Rigsby, M.; Spall, M.; Strum, M.

    1992-12-01

    This report presents an overview of on-site storage of Low Level Waste while providing guidelines for using the complete Interim On-Site Storage of Low Level Waste report series. Overall, this report provides a methodology for planning and implementing on-site storage

  10. 14 CFR 136.41 - Interim operating authority.

    Science.gov (United States)

    2010-01-01

    ... AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.41 Interim operating... terminate 180 days after the date on which an air tour management plan is established for the park and tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  11. ETF interim design review

    International Nuclear Information System (INIS)

    Steiner, D.; Rutherford, P.H.

    1980-01-01

    A three-day ETF Interim Design Review was conducted on July 23-25, 1980, at the Sheraton Potomac Inn in Rockville, Maryland. The intent of the review was to provide a forum for an in-depth assessment and critique of all facets of the ETF design by members of the fusion community. The review began with an opening plenary session at which an overview of the ETF design was presented by D. Steiner, manager of the ETF Design Center, complemented by a physics overview by P.H. Rutherford, chairman of the ETF/INTOR Physics Committee. This was followed by six concurrent review sessions over the next day and a half. The review closed with a plenary session at which the Design Review Board presented its findings. This document consists of the viewgraphs for the opening plenary session and an edited version of the presentations made by Steiner and Rutherford

  12. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  13. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  14. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    The French Act voted in 2006 made the choice of deep geological disposal as the reference option for the long term management of high level (HLW) and intermediate level long-lived waste. The CIGEO repository project aims at avoiding or limiting burden to future generations, which could not be achieved by the extension in time of interim storage. The reversibility as provided by the Act will maintain a liberty of choice for waste management on a duration which is comparable to new storage facility. Interim storage is required to accommodate waste as long as the repository is not available. The commissioning of the repository in 2025 will not suppress needs for interim storage. The paper describes the complementarities between existing and future interim storage facilities and the repository project: repository operational issues and planning, HLW thermal decay, support for the reversibility, etc. It shows opportunities to prepare a global optimization of waste management including the utilization at best of storage capacities and the planning of waste emplacement in the repository in such a way to facilitate operational conditions and to limit cost. Preliminary simulations of storage-disposal scenarios are presented. Thanks to an optimal use of the waste management system, provision can be made for a progressive increase of waste emplacement flow during the first operation phase of the repository. It is then possible to stabilize the industrial activity level of the repository site. An optimal utilization of interim storage can also limit the diversity of waste packages emplaced simultaneously, which facilitates the operation of the repository. 60 years minimum interim storage duration is generally required with respect to HLW thermal output. Extending this interim storage period may reduce the underground footprint of the repository. Regarding reversibility, the capability to manage waste packages potentially retrieved from the repository should be analyzed. The

  15. Binary Thinking in a Complex World: The Failure of NATO Deterrence since 1994 and Implications for the NATO Readiness Action Plan

    Science.gov (United States)

    2017-05-25

    fires of Precision-Guided Munitions (PGMs), special operations, 101Charles K. Bartles, “Getting...was part of Russia until it was gifted in 1954 to the Ukrainian Soviet Socialist Republic.108 Even in 2001, the most recent Ukrainian census, 60% of...seven brigades, including three heavy armored brigades—adequately supported by air power, land-based fires , and other enablers on the ground and ready

  16. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  17. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  18. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  19. 244-AR Vault Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    LANEY, T.

    2000-01-01

    The 244-AR Vault Facility, constructed between 1966 and 1968, was designed to provide lag storage and treatment for the Plutonium-Uranium Extraction Facility (PUREX) tank farm sludges. Tank farm personnel transferred the waste from the 244-AR Vault Facility to B Plant for recovery of cesium and strontium. B Plant personnel then transferred the treatment residuals back to the tank farms for storage of the sludge and liquids. The last process operations, which transferred waste supporting the cesium/strontium recovery mission, occurred in April 1978. After the final transfer in 1978, the 244-AR facility underwent a cleanout. However, 2,271 L (600 gal) of sludge were left in Tank 004AR from an earlier transfer from Tank 241-AX-104. When the cleanout was completed, the facility was placed in a standby status. The sludge had been transferred to Tank 004AR to support Pacific Northwest National Laboratory [PNNL] vitrification work. Documentation of waste transfers suggests that a portion of the sludge may have been moved from Tank 004AR to Tank 002AR in preparation for transfer back to the AX Tank Farm; however, quantities of the sludge that were moved to Tank 002AR from that transfer must be estimated

  20. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  1. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  2. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  3. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  4. Nuclear explosives testing readiness evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Valk, T.C.

    1993-09-01

    This readiness evaluation considers hole selection and characterization, verification, containment issues, nuclear explosive safety studies, test authorities, event operations planning, canister-rack preparation, site preparation, diagnostic equipment setup, device assembly facilities and processes, device delivery and insertion, emplacement, stemming, control room activities, readiness briefing, arming and firing, test execution, emergency response and reentry, and post event analysis to include device diagnostics, nuclear chemistry, and containment. This survey concludes that the LLNL program and its supporting contractors could execute an event within six months of notification, and a second event within the following six months, given the NET group`s evaluation and the following three restraints: (1) FY94 (and subsequent year) funding is essentially constant with FY93, (2) Preliminary work for the initial event is completed to the historical sic months status, (3) Critical personnel, currently working in dual use technologies, would be recallable as needed.

  5. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  6. Terrestrial gravity data analysis for interim gravity model improvement

    Science.gov (United States)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  7. FRACTIONAL CRYSTALLIZATION TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    International Nuclear Information System (INIS)

    HERTING DL

    2008-01-01

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste

  8. Dry storage of spent fuel elements: interim facility

    International Nuclear Information System (INIS)

    Quihillalt, O.J.

    1993-01-01

    Apart from the existing facilities to storage nuclear fuel elements at Argentina's nuclear power stations, a new interim storage facility has been planned and projected by the Argentinean Atomic Energy Commission (CNEA) that will be constructed by private group. This article presents the developments and describes the activities undertaken until the national policy approach to the final decision for the most suitable alternative to be adopted. (B.C.A.). 09 refs, 01 fig, 09 tabs

  9. Readiness for Living Technology

    DEFF Research Database (Denmark)

    Peronard, Jean-Paul

    2013-01-01

    This paper is a comparative analysis between workers in healthcare with high and low degree of readiness for living technology such as robotics. To explore the differences among workers’ readiness for robotics in healthcare, statistical analysis was conducted in the data set obtained from 200...

  10. Can NATO's new Very High Readiness Joint Task Force deter?

    DEFF Research Database (Denmark)

    Rynning, Sten; Ringsmose, Jens

    2017-01-01

    ” a distinct strategic rival – Russia. Chief among the Welsh summit initiatives was the decision to set up a new multinational spearhead force – the Very High Readiness Joint Task Force (VJTF) – as part of an enhanced NATO Response Force (NRF) and within the framework of a so-called Readiness Action Plan (RAP...

  11. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  12. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  13. Interim report on the Global Design Effort Global International Linear Collider (ILC) R&D

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, M.

    2011-04-30

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  14. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  15. Interim district energy implementation

    Energy Technology Data Exchange (ETDEWEB)

    Fearnley, R.; Susak, W. [City of Vancouver, BC (Canada); Johnstone, I. [BCG Services Inc., Vancouver, BC (Canada)

    2001-07-01

    The concept of district energy was introduced in the City of North Vancouver, a city of 45,000, in 1997. A preliminary study was completed in 1997, followed by a tour of some district energy facilities in Finland in the same year. In 1999 a large district energy study was completed by a consultant. The study indicated the need for an investment of $15 million to implement district heating in the City. Lack of sufficient financial resources and immediately connectable heat load, the project was considered a non-starter. Some of the other factors leading to shelving the project included no current significant pricing advantages over competing energy sources and no current opportunity for cogeneration, given the low price that BC Hydro is willing to pay for independently produced power. The project, although shelved for the moment, has not been discarded. Planning and exploration are continuing, aided by the City's commitment to energy efficiency and conservation, its long term planning horizon and its significant influence over the development of some prime real estate.

  16. Agenda 21 interim balance, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  17. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  18. Ad interim legal remedy in case of large projects

    International Nuclear Information System (INIS)

    Limberger, J.

    1985-01-01

    Action for ad interim judicial relief in response to large projects approved of by the authorities very frequently take several years until a decision is taken by the court. Experience has shown that this applies in particular to large projects such as the construction of nuclear power plants, large-size industrial plants, or airports. It has become regular practice by the authorities concerned to issue an order for immediate execution upon the plan approving decision and granting of licence for said projects, in accordance with section 80, sub-section (2), no.4 of the VwGO. The problems thus created with regard to interim legal remedy sought by the parties concerned are of great significance. The book in hand discusses the question as to whether the practice of the administrative authorities and the courts satisfies the requirements embodied in the law, to provide for efficient legal protection. (orig./HSCH) [de

  19. Technology Readiness Level Guidebook

    Science.gov (United States)

    2017-09-01

    This guidebook provides the necessary information for conducting a Technology Readiness Level (TRL) Assessment. TRL Assessments are a tool for determining the maturity of technologies and identifying next steps in the research process. This guidebook...

  20. Validating Acquisition IS Integration Readiness with Drills

    DEFF Research Database (Denmark)

    Wynne, Peter J.

    2017-01-01

    To companies, mergers and acquisitions are important strategic tools, yet they often fail to deliver their expected value. Studies have shown the integration of information systems is a significant roadblock to the realisation of acquisition benefits, and for an IT department to be ready......), to understand how an IT department can use them to validate their integration plans. The paper presents a case study of two drills used to validate an IT department’s readiness to carry out acquisition IS integration, and suggests seven acquisition IS integration drill characteristics others could utilise when...

  1. Measuring Success: Metrics that Link Supply Chain Management to Aircraft Readiness

    National Research Council Canada - National Science Library

    Balestreri, William

    2002-01-01

    This thesis evaluates and analyzes current strategic management planning methods that develop performance metrics linking supply chain management to aircraft readiness, Our primary focus is the Marine...

  2. Concept of economic readiness levels assessment

    Science.gov (United States)

    Yuniaristanto, Sutopo, W.; Widiyanto, A.; Putri, A. S.

    2017-11-01

    This research aims to build a concept of Economic Readiness Level (ERL) assessment for incubation center. ERL concept is arranged by considering both market and business aspects. Every aspect is divided into four phases and each of them consists of some indicators. Analytic Hierarchy Process (AHP) is used to develop the ERL in calculating the weight of every single aspect and indicator. Interval scale between 0 and 4 is also applied in indicator assessment. In order to calculate ERL, score in every indicator and the weight of both the aspect and indicator are considered. ERL value is able to show in detail the innovative product readiness level from economic sight, market and business aspect. There are four levels in Economic Readiness Level scheme which are investigation, feasibility, planning and introduction.

  3. 76 FR 59066 - Notice of Regulatory Review Plan

    Science.gov (United States)

    2011-09-23

    ... [No. 2011-N-10] Notice of Regulatory Review Plan AGENCY: Federal Housing Finance Agency. ACTION... of and requesting comments on the FHFA interim regulatory review plan for review of existing... comments on all aspects of the interim regulatory review plan, including legal and policy considerations...

  4. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  5. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  6. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  7. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  8. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  9. ISOE EG-SAM interim report - Report on behalf of the Sub expert Group

    International Nuclear Information System (INIS)

    Harris, Willie; Miller, David W.; Djeffal, Salah; Anderson, Ellen; Couasnon, Olivier; Hagemeyer, Derek; Sovijarvi, Jukka; Amaral, Marcos A.; Tarzia, J.P.; Schmidt, Claudia; Fritioff, Karin; Kaulard, Joerg; Lance, Benoit; Fritioff, Karin; Schieber, Caroline; Hayashida, Yoshihisa; Doty, Rick

    2014-01-01

    During its November 2012 meeting, the expert group decided to develop an interim (preliminary) report before the end of 2013 (with a general perspective and discussion of specific severe accident management worker dose issues), and to finalize the report by organizing the international workshop of 2014 to address national experiences, which will be incorporated to the report. The work of the EG-SAM focuses on radiation protection management and organization, radiation protection training and exercises related to severe accident management, facility configuration and readiness, worker protection, radioactive materials, contamination controls and logistics and key lessons learned especially from the TMI, Chernobyl and Fukushima Dai-ichi accidents. This interim report was completed through intensive work of all Group members nominated by the ISOE, and was accomplished during EG-SAM meetings through 2012-2013. This document gathers the different presentations given by the sub expert groups in charge of each chapter of the report

  10. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  11. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  12. Capture ready study

    Energy Technology Data Exchange (ETDEWEB)

    Minchener, A.

    2007-07-15

    There are a large number of ways in which the capture of carbon as carbon dioxide (CO{sub 2}) can be integrated into fossil fuel power stations, most being applicable for both gas and coal feedstocks. To add to the choice of technology is the question of whether an existing plant should be retrofitted for capture, or whether it is more attractive to build totally new. This miscellany of choices adds considerably to the commercial risk of investing in a large power station. An intermediate stage between the non-capture and full capture state would be advantageous in helping to determine the best way forward and hence reduce those risks. In recent years the term 'carbon capture ready' or 'capture ready' has been coined to describe such an intermediate stage plant and is now widely used. However a detailed and all-encompassing definition of this term has never been published. All fossil fuel consuming plant produce a carbon dioxide gas byproduct. There is a possibility of scrubbing it with an appropriate CO{sub 2} solvent. Hence it could be said that all fossil fuel plant is in a condition for removal of its CO{sub 2} effluent and therefore already in a 'capture ready' state. Evidently, the practical reality of solvent scrubbing could cost more than the rewards offered by such as the ETS (European Trading Scheme). In which case, it can be said that although the possibility exists of capturing CO{sub 2}, it is not a commercially viable option and therefore the plant could not be described as ready for CO{sub 2} capture. The boundary between a capture ready and a non-capture ready condition using this definition cannot be determined in an objective and therefore universally acceptable way and criteria must be found which are less onerous and less potentially contentious to assess. 16 refs., 2 annexes.

  13. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  14. Manpower Management: No Tiered Readiness - Enabling The Nation’s Force in Readiness

    Science.gov (United States)

    2013-04-09

    readiness. The calculus of effectively pulling resources from the DEP must be driven from the FORCESYNCH, but align to institutional plans. The...physically qualified (medical, dental , panorex) 2,D, D,H,Q Pregnancy (after determination by proper authority) N Postpartum (up to six...months after delivery) Dental Class 3 or 4 Physical Evaluation Board determination R E ADMINISTRATIVE End of active

  15. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  16. Systems security and functional readiness

    International Nuclear Information System (INIS)

    Bruckner, D.G.

    1988-01-01

    In Protective Programming Planning, it is important that every facility or installation be configured to support the basic functions and mission of the using organization. This paper addresses the process of identifying the key functional operations of our facilities in Europe and providing the security necessary to keep them operating in natural and man-made threat environments. Functional Readiness is important since many of our existing facilities in Europe were not constructed to meet the demands of today's requirements. There are increased requirements for real-time systems with classified terminals and stringent access control, tempest and other electronic protection devices. One must prioritize the operations of these systems so that essential functions are provided even when the facilities are affected by overt or covert hostile activities

  17. School Readiness Factor Analyzed.

    Science.gov (United States)

    Brenner, Anton; Scott, Leland H.

    This paper is an empirical statistical analysis and interpretation of data relating to school readiness previously examined and reported on a theoretical basis. A total of 118 white, middle class children from six consecutive kindergarten groups in Dearborn, Michigan were tested with seven instruments, evaluated in terms of achievement, ability,…

  18. GIS Readiness Survey 2014

    DEFF Research Database (Denmark)

    Schrøder, Lise; Hvingel, Line Træholt; Hansen, Henning Sten

    2014-01-01

    The GIS Readiness Survey 2014 is a follow-up to the corresponding survey that was carried out among public institutions in Denmark in 2009. The present survey thus provides an updated image of status and challenges in relation to the use of spatial information, the construction of the com- mon...

  19. Interim reliability evaluation program (IREP)

    International Nuclear Information System (INIS)

    Carlson, D.D.; Murphy, J.A.

    1981-01-01

    The Interim Reliability Evaluation Program (IREP), sponsored by the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission, is currently applying probabilistic risk analysis techniques to two PWR and two BWR type power plants. Emphasis was placed on the systems analysis portion of the risk assessment, as opposed to accident phenomenology or consequence analysis, since the identification of risk significant plant features was of primary interest. Traditional event tree/fault tree modeling was used for the analysis. However, the study involved a more thorough investigation of transient initiators and of support system faults than studies in the past and substantially improved techniques were used to quantify accident sequence frequencies. This study also attempted to quantify the potential for operator recovery actions in the course of each significant accident

  20. Proposal of performance indicators/model for Operational Readiness Verification (ORV) at restart after a planned shutdown; Framtagning av bedoemningsfaktorer/modell foer utvaerdering av driftklarhetsverifiering (DKV) infoer uppstart efter revisionsavstaellning

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, Erik; Nygren, Magnus [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science

    2005-12-15

    The objectives of the study reported here were to propose a model that can be used in the analysis of possible future ORV-related events and to outline a set of performance indicators that can be used by the inspectorate to assess a utility's level of readiness if an ORV-event should take place. Together the two objectives serve to improve the inspectorate's ability to ensure that the utilities maintain an adequate capability to respond. The background for the current study is the nine ORV events that occurred in Sweden between 1995- 1998, as well as the findings of a previous study of safety during outage and restart of nuclear power plants project. This study found that the three levels or types of tests that occur in ORV were used according to need rather than according to a predefined arrangement or procedure, and that tasks were adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. The organisation's coping with the complexity of ORV was discussed by the relation between expectations and surprises, how planning was used as control, attention to details, and the practices of shift changes. It is a truism that accidents are analysed and interpreted relative to a commonly accepted understanding of their nature. This understanding is, however, relative rather than absolute, and has changed significantly during the last decade. In the 1990s, accidents were analysed step by step, and explanations and recommendations therefore emphasised specific rather than generic solutions. The present study illustrates this by going through the responses to the nine ORV events. Following that, the nine events are analysed anew using a contemporary understanding of accidents (a systemic model), which emphasises that incidents more often arise from context induced performance variability than from failures of people. The alternative interpretation provided by a systemic model is illustrated by a detailed

  1. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  2. Starting school healthy and ready to learn: using social indicators to improve school readiness in Los Angeles County.

    Science.gov (United States)

    Wold, Cheryl; Nicholas, Will

    2007-10-01

    School readiness is an important public health outcome, determined by a set of interdependent health and developmental trajectories and influenced by a child's family, school, and community environments. The same factors that influence school readiness also influence educational success and health throughout life. A California cigarette tax ballot initiative (Proposition 10) created new resources for children aged 0 to 5 years and their families statewide through county-level First 5 commissions, including First 5 LA in Los Angeles County. An opportunity to define and promote school readiness indicators was facilitated by collaborative relationships with a strong emphasis on data among First 5 LA, the Children's Planning Council, and the Los Angeles County Public Health Department, and other child-serving organizations. A workgroup developed school readiness goals and indicators based on recommendations of the National Education Goals Panel and five key domains of child well-being: 1) good health, 2) safety and survival, 3) economic well-being, 4) social and emotional well-being, and 5) education/workforce readiness. The Los Angeles County Board of Supervisors and First 5 LA Commission adopted the school readiness indicators. First 5 LA incorporated the indicators into the results-based accountability framework for its strategic plan and developed a community-oriented report designed to educate and spur school readiness-oriented action. The Los Angeles County Board of Supervisors approved a countywide consensus-building plan designed to engage key stakeholders in the use of the indicators for planning, evaluation, and community-building activities. School readiness indicators in Los Angeles County represent an important step forward for public health practice, namely, the successful blending of an expanded role for assessment with the ecological model.

  3. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  4. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dongjin; Choi, Kwangsoon; Yoon, Hyungjoon; Park, Jungsu [KEPCO-E and C, Yongin (Korea, Republic of)

    2014-05-15

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage.

  5. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  6. Dimensions of community and organizational readiness for change.

    Science.gov (United States)

    Castañeda, Sheila F; Holscher, Jessica; Mumman, Manpreet K; Salgado, Hugo; Keir, Katherine B; Foster-Fishman, Pennie G; Talavera, Gregory A

    2012-01-01

    Readiness can influence whether health interventions are implemented in, and ultimately integrated into, communities. Although there is significant research interest in readiness and capacity for change, the measurement of these constructs is still in its infancy. The purpose of this review was to integrate existing assessment models of community and organizational readiness. The database PubMed was searched for articles; articles, book chapters, and practitioner guides identified as references cited in the list of core articles. Studies were included if they met the following criteria: (1) Empirical research, (2) identified community or organizational readiness for innovative health programming in the study's title, purpose, research questions, or hypotheses, and (3) identified methods to measure these constructs. Duplicate articles were deleted and measures published before 1995 were excluded. The search yielded 150 studies; 13 met all criteria. This article presents the results of a critical review of 13 community and organizational readiness assessment models, stemming from articles, chapters, and practitioner's guides focusing on assessing, developing, and sustaining community and organizational readiness for innovative public health programs. Readiness is multidimensional and different models place emphasis on different components of readiness, such as (1) community and organizational climate that facilitates change, (2) attitudes and current efforts toward prevention, (3) commitment to change, and (4) capacity to implement change. When initiating the program planning process, it is essential to assess these four domains of readiness to determine how they apply to the nuances across different communities. Thus, community-based participatory research (CBPR) partnerships, in efforts to focus on public health problems, may consider using readiness assessments as a tool for tailoring intervention efforts to the needs of the community.

  7. Managing Military Readiness

    Science.gov (United States)

    2017-02-01

    These metrics contain critical information and have their place in readiness management. However, they have never been sufficient to fully...demand signals along with simultaneity assumptions form the es- sence of the operational requirements in national strategy. This section briefly... places demands on the capability and capacity of the Air Force that consume its resources in today’s fight and exceed our capacity to address

  8. EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System

    Science.gov (United States)

    Geaslen, W. D.

    1988-01-01

    A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.

  9. Tornado Emergency Readiness Planning for Schools.

    Science.gov (United States)

    Wisconsin State Dept. of Public Instruction, Madison.

    A place of safe refuge in the event of violent natural forces or a tornado should be included in the design of all new school buildings. Existing a school buildings should be analyzed by the architect, contractor, or engineer to determine if a safe place exists or if one can be readily adapted. Most criteria for fallout shelters are the same for…

  10. Readiness evaluation report for operation of the 200-ZP-1 pump-and-treat system

    International Nuclear Information System (INIS)

    Lehrschall, R. R.

    1996-07-01

    The 200-ZP-1 Readiness Evaluation Team has completed a readiness evaluation (RE) of the 200-ZP-1 Interim Remedial Measure. During the RE process, other Environmental Restoration Contractor and Hanford Site project activities were assessed (i.e., using lessons learned reviews) for applicability to the 200-ZP-1 RE. Nine additional areas were discovered to be applicable to the 200-ZP-1 IRM and were incorporated into the RE process as functional readiness requirements. The goal of the 200-ZP-1 Operable Unit IRM is to reduce further migration of the carbon tetrachloride, chloroform, and trichloroethylene in the groundwater of the 200 West Area. The IRM treatment system has been designed to initiate hydraulic containment of the contaminant mass in the high-concentration portion of the CCl 4 plume

  11. Methods Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  12. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  13. PART I: Bioventing Pilot Test Work Plan for Fire Protection Training Area Site FY-03, Charleston AFB, South Carolina. PART II: Draft Interim Pilot Test Results Report for Fire Protection Training Area Site FT-03, Charleston AFB, South Carolina

    National Research Council Canada - National Science Library

    1993-01-01

    This site-specific work plan presents the scope of a bioventing pilot test for in situ treatment of fuel contaminated soils at the Fire Protection Training Area designated as Site FT-O3, Charleston Air Force Base (AFB), South Carolina...

  14. Modernization and refurbishment of the Central Interim Storage

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  15. Developing new transportable storage casks for interim dry storage

    International Nuclear Information System (INIS)

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R.

    2004-01-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication

  16. EMCS Retrofit Analysis - Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  17. Career Readiness: Has Its Time Finally Come?

    Science.gov (United States)

    DeWitt, Stephen

    2012-01-01

    In 2010, the Association for Career and Technical Education (ACTE) released a "What Is Career Ready?" definition. As the career-readiness definition explains, there is much overlap between "college readiness" and "career readiness," but academic preparedness for college alone is not enough to be truly career-ready.…

  18. Organisational readiness for introducing a performance management system

    Directory of Open Access Journals (Sweden)

    Michael Ochurub

    2012-09-01

    Full Text Available Orientation: The successful introduction of performance management systems to the public service requires careful measurement of readiness for change.Research purpose: This study investigated the extent to which employees were ready for change as an indication of whether their organisation was ready to introduce a performance management system (PMS.Motivation for the study: Introducing system changes in organisations depends on positive employee preconditions. There is some debate over whether organisations can facilitate these preconditions. This research investigates change readiness linked to the introduction of a PMS in a public sector organisation. The results add to the growing literature on levels of change readiness.Research design, approach and method: The researchers used a quantitative, questionnairebased design. Because the organisation was large, the researchers used stratified sampling to select a sample from each population stratum. The sample size was 460, which constituted 26% of the total population. They used a South African change readiness questionnaire to elicit employee perceptions and opinions.Main findings: The researchers found that the organisation was not ready to introduce a PMS. The study identified various challenges and key factors that were negatively affecting the introduction of a PMS.Practical/managerial implications: The intention to develop and introduce performance management systems is generally to change the attitudes, values and approaches of managers and employees to the new strategies, processes and plans to improve productivity and performance. However, pre-existing conditions and attitudes could have an effect. It is essential to ensure that organisations are ready to introduce performance management systems and to provide sound change leadership to drive the process effectively. This study contributes to the body of knowledge about the challenges and factors organisations should consider when they

  19. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  20. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  1. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  2. PV ready roofing systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The integration of PV technology into roofs of houses has become very popular in the United States, Japan, Germany and The Netherlands. There could be a considerable market in the UK for these systems, given the large number of houses that are projected to be built in the next 10 years, and taking account of increased awareness of energy issues. A significant proportion of the market share of annual installed PV is for solar PV systems installed into homes (currently 15%), this is expected to rise to 23% (900MW) by 2010. The grid connected roof and building mounted facade systems represent the fastest growing market for PV systems in Europe. In conclusion, therefore, innovative approached for fixing PV technology onto roofs have been identified for both domestic roofs and for the commercial sector. With reference to production methodologies within the roofing industry, both approaches should be capable of being designed with PV-ready connections suitable for fixing PV modules at a later date. This will help overcome the key barriers of cost of installation, skills required and the lack of retrofit potential. Based on the results of this project, Sustainable Energy together with PV Systems are keen to take forward the full research and development of PV-ready systems for both the domestic and commercial sectors.

  3. DOE-owned spent nuclear fuel strategic plan. Revision 1

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) is responsible for safely and efficiently managing DOE-owned spent nuclear fuel (SNF) and SNF returned to the US from foreign research reactors (FRR). The fuel will be treated where necessary, packaged suitable for repository disposal where practicable, and placed in interim dry storage. These actions will remove remaining vulnerabilities, make as much spent fuel as possible ready for ultimate disposition, and substantially reduce the cost of continued storage. The goal is to complete these actions in 10 years. This SNF Strategic Plan updates the mission, vision, objectives, and strategies for the management of DOE-owned SNF articulated by the SNF Strategic Plan issued in December 1994. The plan describes the remaining issues facing the EM SNF Program, lays out strategies for addressing these issues, and identifies success criteria by which program progress is measured. The objectives and strategies in this plan are consistent with the following Em principles described by the Assistance Secretary in his June 1996 initiative to establish a 10-year time horizon for achieving most program objectives: eliminate and manage the most serious risks; reduce mortgage and support costs to free up funds for further risk reduction; protect worker health and safety; reduce generation of wastes; create a collaborative relationship between DOE and its regulators and stakeholders; focus technology development on cost and risk reduction; and strengthen management and financial control

  4. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  5. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  6. AES Water Architecture Study Interim Results

    Science.gov (United States)

    Sarguisingh, Miriam J.

    2012-01-01

    The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems in order to enable NASA human exploration missions beyond low earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near term missions beyond LEO. The secondary objective is to continue to advance mid-readiness level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near and long term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit environmental control and life support systems (ECLSS) definition. This study is being performed in three phases. Phase I of this study established the scope of the study through definition of the mission requirements and constraints, as well as indentifying all possible WRS configurations that meet the mission requirements. Phase II of this study focused on the near term space exploration objectives by establishing an ISS-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.

  7. Advantages on dry interim storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  8. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  9. Advantages on dry interim storage for spent nuclear fuel

    International Nuclear Information System (INIS)

    Romanato, L.S.; Rzyski, B.M.

    2006-01-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  10. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  11. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  12. Status of environmental technology; Interim Report to the sector study 'Petroleum and Energy', the integrated management plan for North Sea. Mapping of available environmental technology; Statusrapport for miljoeteknologi

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    The purpose of this report is to provide an overview of the current status of environmental technology that may help to prevent and reduce / prevent environmental pollution. The report is a foundation report to the management plan for the North Sea. The report was prepared based on the NPD's knowledge and with good input from the PSA, and resource persons in the oil companies. The following is given a summary of the various disciplines and the technological challenges the industry has managed to meet and which ones remain. (Author)

  13. DOE Richland readiness review for PUREX

    International Nuclear Information System (INIS)

    Zamorski, M.J.

    1984-01-01

    For ten months prior to the November 1983 startup of the Plutonium and URanium EXtraction (PUREX) Plant, the Department of Energy's Richland Operations Office conducted an operational readiness review of the facility. This review was performed consistent with DOE and RL Order 5481.1 and in accordance with written plans prepared by the program and safety divisions. It involved personnel from five divisions within the office. The DOE review included two tasks: (1) overview and evaluation of the operating contractor's (Rockwell Hanford) readiness review for PUREX, and (2) independent assessment of 25 significant aspects of the startup effort. The RL reviews were coordinated by the program division and were phased in succession with the contractor's readiness review. As deficiencies or concerns were noted in the course of the review they were documented and required formal response from the contractor. Startup approval was given in three steps as the PUREX Plant began operation. A thorough review was performed and necessary documentation was prepared to support startup authorization in November 1983, before the scheduled startup date

  14. Process operational readiness and operational readiness follow-on

    International Nuclear Information System (INIS)

    Nertney, R.J.

    1992-11-01

    The first document in the System Safety Development Center (SSDC) series deals with the subject of Occupancy-Use Readiness. The material included in that manual provided the basis for development of the SSDC workshop in Operational Readiness. The original Occupancy Readiness Manual, however, deals only generally with the subject of process safety; i.e., the safety of overall ''processes'' such as solar collection systems, nuclear reactors, and coal fired electrical plants. The manual also fails to detail the considerations involved in maintaining the state of readiness on a continuing basis. Both of the latter subjects are dealt with in some detail in the SSDC's Operational Readiness Workshop. The purpose of this document is to provide additional documentary material dealing with subjects introduced in SSDC-1 Occupancy-Use Readiness Manual, and SSDC-12, Safety Considerations in Evaluation of Maintenance Programs. In augmenting SSDC-1, Part I of this manual provides additional material related to process safety; in the case of SSDC-12, the subject of safety considerations in evaluation of maintenance programs is broadened in Part II to include maintenance of personnel systems and procedural systems as well as hardware. ''Maintenance'' is related more directly to the concept of operational readiness and an alternative analytical tree is provided for hardware maintenance program evaluation

  15. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  16. Interim FEP report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    level. This latter group of FEPs is also documented in the SR-Can version of the FEP database. The further processing of the initial state FEPs revealed that those FEPs that are not covered by the description of the repository design or by the site description, concern deviations from the intended initial state as a consequence of undetected mishaps, sabotage etc. These FEPs were propagated to the selection of scenarios. Relevant process FEPs from the audit were used to update the SR 97 set of internal processes for the engineered barrier system and the geosphere. The resulting SR-Can set of processes for the buffer are documented in the interim version of the SR-Can Process report and as process headings in the SR-Can interim version of the FEP database. Preliminary lists with SR-Can processes for the other system components are presently available in the interim version of the FEP database, but these lists will be further processed and documented in the final version of the SR-Can Process report. External FEPs from the audit were checked against the plans for managing these issues in SR-Can. Climate and large-scale geological FEPs were compared against the plans for modelling these phenomena and the handling of future human actions were compared to the handling in SR 97, which forms the basis for the handling in SR-Can. The coverage was found satisfactory. The results are not documented in the interim version of the SR-Can database, but will be so in the final version of the SR-Can database.

  17. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    level. This latter group of FEPs is also documented in the SR-Can version of the FEP database. The further processing of the initial state FEPs revealed that those FEPs that are not covered by the description of the repository design or by the site description, concern deviations from the intended initial state as a consequence of undetected mishaps, sabotage etc. These FEPs were propagated to the selection of scenarios. Relevant process FEPs from the audit were used to update the SR 97 set of internal processes for the engineered barrier system and the geosphere. The resulting SR-Can set of processes for the buffer are documented in the interim version of the SR-Can Process report and as process headings in the SR-Can interim version of the FEP database. Preliminary lists with SR-Can processes for the other system components are presently available in the interim version of the FEP database, but these lists will be further processed and documented in the final version of the SR-Can Process report. External FEPs from the audit were checked against the plans for managing these issues in SR-Can. Climate and large-scale geological FEPs were compared against the plans for modelling these phenomena and the handling of future human actions were compared to the handling in SR 97, which forms the basis for the handling in SR-Can. The coverage was found satisfactory. The results are not documented in the interim version of the SR-Can database, but will be so in the final version of the SR-Can database

  18. Technology Readiness for the Smart Grid

    Energy Technology Data Exchange (ETDEWEB)

    Kirkham, Harold; Marinovici, Maria C.; Fitzpatrick, G.; Lindsey, K.; McBride, James; Clark, G. L.

    2013-06-30

    Reluctance to adopt new technology into a utility application is understandable, given the critical nature of the infrastructure and the less-than-ideal experiences of some power companies. The authors of this paper have considered adapting the NASA approach of classifying technology readiness, but find it not quite appropriate because NASA was both the developer and the eventual user of the new technology it was evaluating, whereas a utility is ordinarily in the mode of a customer, acquiring a new product from a manufacturer. Instead of a generic scale of technology readiness, a scale of readiness is proposed specifically for the smart grid, based on the many standards that exist for the relevant technologies. In this paper we present an overall structure for organization those standards. The acceptance of new technology is organized into five SGL (Smart Grid Level) steps, numbered five through 9 to correspond approximately to the last five numbers of the NASA TRL scale. SGL 5 is a certification that the hardware and software of the technology is safe for the system into which is intended to be placed. SGL 6 is documentation that the system is safe for itself, and will have adequate reliability. It is thus clear that the steps differ from NASA’s TRL in that technology development is not required, the transition is more one of documenting already existing system readiness. Since SGL 6 describes a system that is safe for the power system and for itself, it should not be restricted from being in a pilot-scale study, and achieving SGL 7. A larger-scale demonstration in a realistic environment will demonstrate interoperability and achieve SGL 8. Only when systems are installed and operating, and when disposal plans are in place will the designation of fully operable at SGL 9 be granted.

  19. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  20. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  1. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  2. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  3. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  4. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  5. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  6. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  7. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  8. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  9. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  10. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Science.gov (United States)

    2010-07-01

    ... throughout the implementation process. The interim targets and interim goals shall be consistent with each... management, the interim targets may be modified, consistent with the processes set forth in paragraph (c) of... implementation of the Plan. (5) The Corps of Engineers and the South Florida Water Management District shall...

  11. Making a Quit Plan

    Science.gov (United States)

    ... BACK CLOSE SMOKEFREE.GOV HOME Create My Quit Plan Quitting starts now. Make a plan . Step 1 of 7 mark Step 2 of ... boosts your chances of success. Build a quit plan to get ready and find out what to ...

  12. Zero Energy Ready Home Multifamily Case Study Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, Jordan [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States); Alaigh, Kunal [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States)

    2016-02-01

    Two multifamily buildings planned in Climate Zone 4 were analyzed to determine the cost, energy and performance implications of redesigning them to comply with Zero Energy Ready Home, a recognition program of the U.S. Department of Energy. Energy modeling was conducted on one representative apartment in each building using BEopt.

  13. Assessing the readiness of contractors in implementing low carbon ...

    African Journals Online (AJOL)

    For the implementation of low carbon construction in our construction industry, the contractors need to be ready and have knowledge to adopt low carbon construction ... A checklist was established by summarizing the highest low carbon activities from each category which were sustainable site planning and management, ...

  14. Centralized interim storage facility for radioactive wastes at Wuerenlingen (ZWILAG)

    International Nuclear Information System (INIS)

    Lutz, H.R.; Schnetzler, U.

    1994-01-01

    Radioactive waste management in Switzerland is the responsibility of the waste producers; in this respect, the law requires permanent, safe management of the wastes by means of final disposal. Nagra is responsible for the research and development work associated with final disposal. Processing of the wastes into a form suitable for disposal, as well as interim storage, remain the responsibility of the waste producers. In order to supplement the existing conditioning and storage facilities at the nuclear power plants and to replace the outdated waste treatment plant at the Paul Scherrer Institute (PSI) at Wuerenlingen, the operators of the Swiss nuclear power plants are planning a joint treatment and storage facility at the PSI-East site. The organisation ''Zwischenlager Wuerenlingen AG'', which was set up at the beginning of 1990, has been entrusted with this task. (author) 4 figs

  15. 78 FR 894 - Interim Final Determination To Stay Sanctions, Imperial County Air Pollution Control District

    Science.gov (United States)

    2013-01-07

    ...EPA is making an interim final determination to stay imposition of sanctions based on a proposed approval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The revisions concern local rules that regulate inhalable particulate matter (PM10) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County.

  16. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  17. Fund management plan

    International Nuclear Information System (INIS)

    1983-05-01

    The Nuclear Waste Policy Act of 1982, P.L. 97-425 (the Act), provides for establishment of two separate special funds in the US Treasury, the Interim Storage Fund and the Nuclear Waste Fund (the Funds). The Interim Storage Fund (Sec. 136) is the financing mechanism for the provision of federal interim storage capacity, not to exceed 1900 metric tons, for spent nuclear fuel (SNF) from civilian reactors. Basically, interim storage of SNF is the responsibility of the owners and generators of nuclear wastes. Storage at government facilities will be provided only if the utilities do not have adequate storage capacity. The Nuclear Waste Fund (Sec. 302) is the statutory financing approach for the Department's radioactive waste disposal program. P.L. 97-425 directs utilities to pay a mandatory fee to cover DOE's expected costs for nuclear waste disposal. The Funds are administered by the Department of Energy. This Plan identifies how DOE will implement and manage the Nuclear Waste and Interim Storage Funds

  18. Irradiation of ready meals for microbiological safety and shelf-life ...

    African Journals Online (AJOL)

    Microbiological quality of waakye and other ready-to-eat meals. ... and 14 meals prepared under the hazard analysis and critical control point (HACCP) plan were ... sauce and vegetable salad, exceeded the microbiological standards for such ...

  19. Climate Ready Estuaries

    Science.gov (United States)

    Information on climate change impacts to different estuary regions, tools and resources to monitor changes, and information to help managers develop adaptation plans for risk management of estuaries and coastal communities.

  20. LHCf: ready to go

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    Reinstalled in the tunnel at the end of 2014, the two detectors of the LHCf experiment are now ready for operation. The first data should be taken in May.   LHCf’s Arm1 detector. The Large Hadron Collider forward (LHCf) experiment measures neutral particles emitted at nearly zero degrees from the proton beam direction. Because these "very forward" particles carry a large fraction of the collision energy, they are important for understanding the development of atmospheric air-shower phenomena produced by high-energy cosmic rays. To measure these particles, two detectors, Arm1 and Arm2, sit along the LHC beamline, at 140 metres either side of the ATLAS collision point. In July 2010, after a 9-month operation, the LHCf collaboration removed the two detectors from the tunnel to avoid severe radiation damage. The Arm2 detector was reinstalled in the tunnel for data-taking with proton–lead collisions in 2013, while Arm1 was being upgraded to be a radiation-ha...

  1. Change readiness research

    DEFF Research Database (Denmark)

    Høstgaard, Anna Marie Balling

    2006-01-01

    the ”Basic Structure for The Electronic Health Record” (B-EHR) using prototypes. http://medinfo.dk/epj/proj/gepka/). In the Gepka project the participation varied from 33.3% to 78.9%. The objective of this study is to set out themes by which this variation can be studied. A qualitative explorative research...... of participation – it is to suggest a qualitative relationship between the two. Neither does this study try to generalize the results, as further research on more wards would be needed to do so. This study does, however, set out themes that can be a useful tool in future CRR projects in order to maximize......The Change readiness research method (CRR) has become a wellknown method in Denmark to identify issues needed to be discussed on a hospital ward before implementation of a new IT-system and to start a dialogue. A precondition for a constructive dialogue, however, is a high degree of participation...

  2. Smoke Ready Toolbox for Wildfires

    Science.gov (United States)

    This site provides an online Smoke Ready Toolbox for Wildfires, which lists resources and tools that provide information on health impacts from smoke exposure, current fire conditions and forecasts and strategies to reduce exposure to smoke.

  3. Checklist for clinical readiness published

    Science.gov (United States)

    Scientists from NCI, together with collaborators from outside academic centers, have developed a checklist of criteria to evaluate the readiness of complex molecular tests that will guide decisions made during clinical trials. The checklist focuses on tes

  4. Can NATO's new very high readiness joint task force deter?

    DEFF Research Database (Denmark)

    Rynning, Sten; Ringsmose, Jens

    2017-01-01

    When NATO-allies met at their Wales summit in September 2014, the D-word was back in vogue. Not in a muttering, shy or implicit way, but unambiguously and straightforward. For the first time in more than two decades NATO’s heads of states and governments openly discussed how best to “deter......” a distinct strategic rival – Russia. Chief among the Welsh summit initiatives was the decision to set up a new multinational spearhead force – the Very High Readiness Joint Task Force (VJTF) – as part of an enhanced NATO Response Force (NRF) and within the framework of a so-called Readiness Action Plan (RAP...

  5. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  6. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  7. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  8. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  9. The Spanish general radioactive waste plan

    International Nuclear Information System (INIS)

    Redondo, J.M.

    2007-01-01

    The author summarized the current status of Spain's general radioactive waste management plan. This plan forms the basis for a national radioactive waste management policy and decommissioning strategy. It is updated periodically, the current 5. plan was approved in 1999. The most important element of the current strategy is the development of a centralized interim HLW storage facility by 2010. (A.L.B.)

  10. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  11. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  12. Spent Fuel Long Term Interim Storage: The Spanish Policy

    International Nuclear Information System (INIS)

    Fernandez-Lopez, Javier

    2014-01-01

    ENRESA is the Spanish organization responsible for long-term management of all categories of radioactive waste and nuclear spent fuel and for decommissioning nuclear installations. It is also in charge of the management of the funds collected from waste producers and electricity consumers. The national policy about radioactive waste management is established at the General Radioactive Waste Plan by the Government upon proposal of the Ministry of Industry, Energy and Tourism. Now the Plan in force is the Sixth Plan approved in 2006. The policy on spent nuclear fuel, after description of the current available options, is set up as a long term interim storage at a Centralized Temporary Storage facility (CTS, or ATC in Spanish acronym) followed by geologic disposal, pending technological development on other options being eligible in the future. After a site selection process launched in 2009, the site for the ATC has been chosen at the end of 2011. The first steps for the implementation of the facility are described in the present paper. (authors)

  13. Interim report of working group of Nuclear Fusion Committee

    International Nuclear Information System (INIS)

    Takuma, Hiroshi

    1986-01-01

    The conclusion of the working group was presented as an interim report to the general meeting of Nuclear Fusion Committee, which became the base for deciding the future plan. The report was the result of the hard work for about a half year by five Committee experts and 23 researchers, and has the rich contents. At present, the supply of petroleum relaxed, and the trend that a large amount of investment for a long period for nuclear fusion research is problematical has become strong. Of course, the importance of the nuclear fusion research never changes. The research projects of Heliotron E, Gekko 12, Gamma 10 and so on have advanced, and the base for synthetically promoting the research has been completed. It is indispensable to decide the most effective plan for the next stage. The working group discussed on the five year plan, especially on the research based on a large project. The policy of the works and problems, the progress of the works of respective subgroups, and the summarization are reported. The researches on nuclear burning simulation, no current plasma using an external conductor system and making an axisymmetrical high-beta torus steady were proposed. (Kako, I.)

  14. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  15. Acoustics Critical Readiness Review

    Science.gov (United States)

    Ballard, Kenny

    2010-01-01

    This presentation reviews the status of the acoustic equipment from the medical operations perspective. Included is information about the acoustic dosimeters, sound level meter, and headphones that are planned for use while on orbit. Finally there is information about on-orbit hearing assessments.

  16. Ready and Able

    Science.gov (United States)

    Osborn, John E.

    2005-01-01

    School districts operate under bidding laws that, in many cases, restrict the flexibility they have in pre-qualifying contractors and limit choices in project-delivery methods. Because the legal impediments imposed on school districts are not likely to change, it is essential that institutions focus on more effective planning and troubleshooting.…

  17. Nurses’ perspectives on readiness of organizations for change: a comparative study

    Directory of Open Access Journals (Sweden)

    Amarneh BH

    2017-04-01

    Full Text Available Basil Hameed Amarneh Department of Psychiatric and Community Health Nursing, Faculty of Nursing, Jordan University of Science and Technology, Irbid, Jordan Purpose: The purpose of this study is to evaluate readiness for change perceived by nurses at Jordanian hospitals according to the hospital type and the gender of nurse.Background: There are misconceptions about readiness for change, and only a few health care and nursing studies about organizational readiness for change have been conducted. Nurses’ perceptions of their organizations’ readiness for change are important; they help in introducing, managing, and maintaining the change.Methods: Using a quantitative comparative research design and a validated survey, data were collected in 2010 from a convenience sample of 130 nurses from four government and three private hospitals with a response rate of 59%.Results: There are some issues in Jordanian hospitals, which show that change has to be managed well. Nurses in government hospitals and female nurses perceived their hospitals to be more ready for change, compared with those in private hospitals and male nurses.Conclusion: Government hospitals were more ready to change than private hospitals, particularly in supporting collaborative and multidisciplinary team approaches to patient care. More than male nurses, female nurses perceived that their organizations were ready to use or plan to use advanced practice nurses. One of the recommendations is a need for targeted intervention to improve readiness for change. Keywords: readiness for change, organizations, hospitals, nurses, Jordan

  18. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  19. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  20. Continuous Covariate Imbalance and Conditional Power for Clinical Trial Interim Analyses

    Science.gov (United States)

    Ciolino, Jody D.; Martin, Renee' H.; Zhao, Wenle; Jauch, Edward C.; Hill, Michael D.; Palesch, Yuko Y.

    2014-01-01

    Oftentimes valid statistical analyses for clinical trials involve adjustment for known influential covariates, regardless of imbalance observed in these covariates at baseline across treatment groups. Thus, it must be the case that valid interim analyses also properly adjust for these covariates. There are situations, however, in which covariate adjustment is not possible, not planned, or simply carries less merit as it makes inferences less generalizable and less intuitive. In this case, covariate imbalance between treatment groups can have a substantial effect on both interim and final primary outcome analyses. This paper illustrates the effect of influential continuous baseline covariate imbalance on unadjusted conditional power (CP), and thus, on trial decisions based on futility stopping bounds. The robustness of the relationship is illustrated for normal, skewed, and bimodal continuous baseline covariates that are related to a normally distributed primary outcome. Results suggest that unadjusted CP calculations in the presence of influential covariate imbalance require careful interpretation and evaluation. PMID:24607294

  1. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  2. Factors of children's school readiness

    Directory of Open Access Journals (Sweden)

    Ljubica Marjanovič Umek

    2006-12-01

    Full Text Available The purpose of the study was to examine the effect of preschool on children's school readiness in connection with their intellectual abilities, language competence, and parents' education. The sample included 219 children who were 68 to 83 months old and were attending the first year of primary school. Children were differentiated by whether or not they had attended preschool before starting school. Children's intellectual ability was determined using Raven's Coloured Progressive Matrices (CPM; Raven, Raven, & Court, 1999, language competence using the Lestvice splošnega govornegarazvoja–LJ (LSGR–LJ, Scales of General Language Development; Marjanovič Umek, Kranjc, Fekonja in Bajc, 2004, and school readiness with the Preizkus pripravljenosti za šolo (PPŠ, Test of School Readiness; Toličič, 1986. The results indicate that children's intellectual ability and language competence have a high predictive value for the school readiness — they explained 51% of the variance in children's scores on the PPŠ. Preschool enrollment has a positive effect on school readiness for children whose parents have a low level of education, but not for those whose parents are highly educated.

  3. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  4. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  5. Operational readiness of EFAD systems

    International Nuclear Information System (INIS)

    Kabat, M.J.

    1992-02-01

    An assessment of the operational readiness of the Emergency Filtered Air Discharge (EFAD) systems, installed in Canadian CANDU multi-unit nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on EFAD system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of EFAD systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for revisions which are needed to achieve and maintain appropriate operational readiness of EFAD systems

  6. Developing new transportable storage casks for interim dry storage

    Energy Technology Data Exchange (ETDEWEB)

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R. [Hitachi Zosen Diesel and Engineering Co., Ltd., Tokyo (Japan)

    2004-07-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication.

  7. Design criteria for the 200-ZP-1 interim remedial measure

    International Nuclear Information System (INIS)

    Mudge, J.F.; Olson, J.W.

    1995-08-01

    The Interim Remedial Measure Proposed Plan for the 200-ZP-1 Operable Unit recommended a pump and treat action to contain contaminated groundwater and limit further degradation of groundwater due to elevated concentrations of carbon tetrachloride, chloroform, and trichloroethylene in the 200-ZP-1 Operable Unit. This design criteria document defines the Project. The Project encompasses: site preparation; development of groundwater wells for monitoring, extraction, and injection; extraction and injection equipment; construction of a treatment system with support buildings/utilities; management; engineering design, analysis, and reporting; and operation and maintenance. A groundwater pump and treat system, hereafter the System, will be composed of extraction wells, a piping network, treatment equipment, water storage, and injection wells. Based upon engineering judgment, the selected technology in the proposed plan (DOE-RL 1994a) is air stripping of the organic contaminants followed by vapor-phase adsorption onto granulated activated carbon (GAC); liquid-phase GAC may be required as a polishing step. The Treatment Equipment refers to air stripping towers, adsorption vessels, water pumps, air blowers, instrumentation, and control devices which will be procured as a turn-key system

  8. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    Science.gov (United States)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  9. 76 FR 46621 - Group Health Plans and Health Insurance Issuers Relating to Coverage of Preventive Services Under...

    Science.gov (United States)

    2011-08-03

    ... to the interim final regulations implementing the rules for group health plans and health insurance... dates. These interim final regulations generally apply to group health plans and group health insurance... from HHS on private health insurance for consumers can be found on the Centers for Medicare & Medicaid...

  10. Waste Encapsulation and Storage Facility (WESF) Design Reconstitution Plan

    International Nuclear Information System (INIS)

    HERNANDEZ, R.

    1999-01-01

    The purpose of Design Reconstitution is to establish a Design Baseline appropriate to the current facility mission. The scope of this plan is to ensure that Systems, Structures and Components (SSC) identified in the WESF Basis for Interim Operation (HNF-SDWM-BIO-002) are adequately described and documented, in order to support facility operations. In addition the plan addresses the adequacy of selected Design Topics which are also crucial for support of the facility Basis for Interim Operation (BIO)

  11. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  12. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  13. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  14. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  15. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  16. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  17. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  18. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  19. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  20. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  1. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  2. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  3. Ready to crown

    LENUS (Irish Health Repository)

    McReynolds, David

    2017-04-01

    When multiple teeth or localised segments of the mouth require crowns, the restorative interventions involved can be psychologically and physically demanding for the operator, patient and dental technician alike.1,2 It is important that all parties involved in restorations of this nature hold a shared understanding of the expected outcome of treatment, with a realistic, common end goal in mind right from the very beginning. Such clarity of thought and communication is key to avoiding biological, mechanical and aesthetic failures in the planning and execution of advanced restorative treatments. Biomechanically stable and aesthetically pleasing provisional restorations are an essential aspect of treatment, which allow teeth to be prepared and provisionalised over multiple appointments within the comfort zone of the operator and patient.3

  4. The Social Context of Readiness.

    Science.gov (United States)

    Nelson, Regena Fails

    This study examined how kindergarten teachers' views of readiness (maturational, learning, or school) are influenced by students from urban, suburban, and rural areas; by minority and non-minority students; and by students from lower and middle class backgrounds. The framework for the study was the social constructivist theory, the theory that all…

  5. Readiness for Solving Story Problems.

    Science.gov (United States)

    Dunlap, William F.

    1982-01-01

    Readiness activities are described which are designed to help learning disabled (LD) students learn to perform computations in story problems. Activities proceed from concrete objects to numbers and involve the students in devising story problems. The language experience approach is incorporated with the enactive, iconic, and symbolic levels of…

  6. Consequence Management - Ready or Not?

    Science.gov (United States)

    2003-04-07

    Defense will have sufficient capability and be ready to respond to a Weapons of Mass Destruction/ Effects attack. An effective consequence management...Defense adopts the National Military Strategy and its consequence management approach, it must identify Weapons of Mass Destruction/ Effects threats...that the Department of Defense: develop Weapons of Mass Destruction/ Effects performance standards for response assets; implement a consequence

  7. Onderzoek online readiness modezaken 2012

    NARCIS (Netherlands)

    Boels, Han; Weltevreden, Jesse

    2013-01-01

    In dit onderzoek is de online readiness van modezaken in 2012 in kaart gebracht. In totaal hebben 124 (voornamelijk zelfstandige) modezaken deelgenomen aan het onderzoek. Het onderzoek is uitgevoerd door het lectoraat Online Ondernemen samen met studenten van de minor Marketing Tomorrow van de

  8. Onderzoek online readiness rijscholen 2013

    NARCIS (Netherlands)

    Weltevreden, Jesse; Boels, Han

    2013-01-01

    In dit onderzoek is de online readiness van rijscholen in 2013 in kaart gebracht. In totaal hebben 115 rijscholen deelgenomen aan het onderzoek. Het onderzoek is uitgevoerd door het lectoraat Online Ondernemen samen met studenten van de minor Marketing Tomorrow van de Hogeschool van Amsterdam.

  9. Workplace Readiness for Communicating Diversity.

    Science.gov (United States)

    Muir, Clive

    1996-01-01

    Proposes a model for communicating change about diversity using a workplace-readiness approach. Discusses ways organizational change agents can assess the company's current interpersonal and social dynamics, use appropriate influence strategies, and create effective messages that will appeal to employees and help to achieve the desired acceptance…

  10. Safe, Healthy and Ready to Succeed: Arizona School Readiness Key Performance Indicators

    Science.gov (United States)

    Migliore, Donna E.

    2006-01-01

    "Safe, Healthy and Ready to Succeed: Arizona School Readiness Key Performance Indicators" presents a set of baseline measurements that gauge how well a statewide system of school readiness supports is addressing issues that affect Arizona children's readiness for school. The Key Performance Indicators (KPIs) measure the system, rather…

  11. Solar Ready: An Overview of Implementation Practices

    Energy Technology Data Exchange (ETDEWEB)

    Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

    2012-01-01

    This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

  12. First interim examination of defected BWR and PWR rods tested in unlimited air at 2290C

    International Nuclear Information System (INIS)

    Einziger, R.E.; Cook, J.A.

    1983-01-01

    A five-year whole rod test was initiated to investigate the long-term stability of spent fuel rods under a variety of possible dry storage conditions. Both PWR and BWR rods were included in the test. The first interim examination was conducted after three months of testing to determine if there was any degradation in those defected rods stored in an unlimited air atmosphere. Visual observations, diametral measurements and radiographic smears were used to assess the degree of cladding deformation and particulate dispersal. The PWR rod showed no measurable change from the pre-test condition. The two original artificial defects had not changed in appearance and there was no diametral growth of the cladding. One of the defects in BWR rod showed significant deformation. There was approximately 10% cladding strain at the defect site and a small axial crack had formed. The fuel in the defect did not appear to be friable. The second defect showed no visible change and no cladding strain. Following examination, the test was continued at 230 0 C. Another interim examination is planned during the summer of 1983. This paper discusses the details and meaning of the data from the first interim examination

  13. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    Science.gov (United States)

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  14. The 2005 European e-Business Readiness Index

    OpenAIRE

    Pennoni, Fulvia; Tarantola, Stefano; Latvala, Ari

    2006-01-01

    Assessment of the eEurope 2005 Action Plan Benchmarking Index “E-Business Readiness Composite Indicator” using data collected by National Statistical Institutes and harmonised by Eurostat, using surveys “ICT usage of enterprises”, with reference years 2003 and 2004. This report contains data from 26 countries as collected in 2004 and as reported by Eurostat in June 2005. Performed analyses include obustness analysis, uncertainty and sensitivity analysis for two categories of ICT (Adoption ...

  15. Determining registered nurses' readiness for evidence-based practice.

    Science.gov (United States)

    Thiel, Linda; Ghosh, Yashowanto

    2008-01-01

    As health care systems worldwide move toward instituting evidence-based practice (EBP), its implementation can be challenging. Conducting a baseline assessment to determine nurses' readiness for EBP presents opportunities to plan strategies before implementation. Although a growing body of research literature is focused on implementing EBP, little attention has been paid to assessing nurses' readiness for EBP. The purpose of this study was to assess registered nurses' readiness for EBP in a moderate-sized acute care hospital in the Midwestern United States before implementation of a hospital-wide nursing EBP initiative. A descriptive cross-sectional survey design was used; 121 registered nurses completed the survey. The participants (n= 121) completed the 64-item Nurses' Readiness for Evidence-Based Practice Survey that allowed measurement of information needs, knowledge and skills, culture, and attitudes. Data were analyzed using descriptive statistics and a post hoc analysis. The majority (72.5%) of respondents indicated that when they needed information, they consulted colleagues and peers rather than using journals and books; 24% of nurses surveyed used the health database, Cumulative Index to Nursing & Allied Health Literature (CINAHL). The respondents perceived their EBP knowledge level as moderate. Cultural EBP scores were moderate, with unit scores being higher than organizational scores. The nurses' attitudes toward EBP were positive. The post hoc analysis showed many significant correlations. Nurses have access to technological resources and perceive that they have the ability to engage in basic information gathering but not in higher level evidence gathering. The elements important to EBP such as a workplace culture and positive attitudes are present and can be built upon. A "site-specific" baseline assessment provides direction in planning EBP initiatives. The Nurses' Readiness for EBP Survey is a streamlined tool with established reliability and

  16. Nigerian CSM project ready to roll.

    Science.gov (United States)

    1985-01-01

    Nigeria's contraceptive social marketing (CSM) project is ready to be launched. Population Services Intenational (PSI) had completed the groundwork for the project, funded primarily by a $200,000 grant from the nonpofit D.K. Tyagi Fund. The Population Crisis Committee also provided support for the new project. At presstime, PSI was negotiating for continued project funding from the US Agency for International Development (USAID) and The Futures Group. PSI already has identified suitable products, researched brand names, arranged for distribution, appointed an advertising agency, designed packaging, written a marketing plan, and taken steps to create a local, nonprofit marketing organization to manage the project. PSI has named Tim Barton as the resident manager. He will take up his post once the issue of future funding is resolved. Contraceptives now available are distributed through the private sector and by the Planned Parenthood Federation of Nigeria, the Local International Planned Parenthood Federation affiliate. Nigeria's annual rate of population growth is about 3% and the country is urbanizing rapidly. A 1983 fertility report revealed that only 14% of Nigerian women had ever used any type of contraception; 6% of married women were using a contraceptive method at the time of the survey.

  17. Interim Storage of Spent Nuclear Fuel before Final Disposal in Germany - Regulator's view

    International Nuclear Information System (INIS)

    Arens, G.; Goetz, Ch.; Geupel, Sandra; Gmal, B.; Mester, W.

    2014-01-01

    For spent nuclear fuel management in Germany the concept of dry interim storage in dual purpose casks before direct disposal is applied. The Federal Office for Radiation Protection (BfS) is the competent authority for licensing of interim storage facilities. The competent authority for surveillance of operation is the responsible authority of the respective federal state (Land). Currently operation licenses for storage facilities have been granted for a storage time of 40 years and are based on safety demonstrations for all safety issues as safe enclosure, shielding, sub-criticality and decay heat removal under consideration of operation conditions. In addition, transportability of the casks for the whole storage period has to be provided. Due to current delay in site selection and exploration of a disposal site, an extension of the storage time beyond 40 years could be needed. This will cause appropriate actions by the licensee and the competent authorities as well. A brief description of the regulatory base of licensing and surveillance of interim storage is given from the regulators view. Furthermore the current planning for final disposal of spent nuclear fuel and high level waste and its interconnections between storage and disposal concepts are shortly explained. Finally the relevant aspects for licensing of extended storage time beyond 40 years will be discussed. Current activities on this issue, which have been initiated by the Federal Government, will be addressed. On the regulatory side a review and amendment of the safety guideline for interim storage of spent fuel has been performed and the procedure of periodic safety review is being implemented. A guideline for implementing an ageing management programme is available in a draft version. Regarding safety of long term storage a study focussing on the identification and evaluation of long term effects as well as gaps of knowledge has been finished in 2010. A continuation and update is currently underway

  18. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.

    1998-01-07

    This memorandum provides a summary of PHMC [Project Hanford Management Contract] team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to-proceed, a summary of the PHMC team readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  19. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    International Nuclear Information System (INIS)

    Boston, H.L.

    1998-01-01

    This memorandum provides a summary of PHMC [Project Hanford Management Contract] team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to-proceed, a summary of the PHMC team readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team's component of the Phase 1 Mission

  20. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    International Nuclear Information System (INIS)

    Jordan, K.N.

    1998-01-01

    This memorandum provides a summary of PHMC (Project Hanford Management Contract) team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to proceed, a summary of the PHMC readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team's component of the Phase 1 Mission

  1. 12 CFR 25.27 - Strategic plan.

    Science.gov (United States)

    2010-01-01

    ... must include annual interim measurable goals under which the OCC will evaluate the bank's performance..., investment, and services, as appropriate. (ii) A bank shall address in its plan all three performance... goals. A bank shall specify in its plan measurable goals that constitute “satisfactory” performance. A...

  2. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  3. Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan

    National Research Council Canada - National Science Library

    York, Michael A

    2008-01-01

    .... This capability is developed through the Fleet Readiness Training Plan (FRTP) where the Navy's carriers are scheduled in staggered 32-month cycles consisting of four phases of progressive readiness levels...

  4. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  5. Conceptual design of interim storage facility for CNAI

    International Nuclear Information System (INIS)

    Fuenzalida Troyano, Carlos S.; Bergallo, Juan E.; Nassini, Horacio E.P.; Blanco, Anibal; Delmastro, Dario F.

    2007-01-01

    The reduced storage capacity available in the two spent fuel pools of argentine PHWR Atucha-1 power plant, the current plans for extending the reactor operation beyond its design lifetime, and the government decision on Atucha-2 NPP construction ending, have motivated the evaluation of a dry storage option for the interim management of spent fuel assemblies. Two different designs are presently being analyzed by an expert working group, from both technical and economical points of views. Authors are proposing a modular system consisting of an arrangement of reinforced concrete structures into which welded metallic canisters loaded with 37 spent fuel assemblies each stored in horizontal position. The reinforced concrete module is designed to provide the necessary physical protection and biological shielding to the loaded canisters during long-term storage, as well as passive means to remove the spent fuel decay heat by a combination of radiation, conduction and natural air convection. In this works are presented advances in the conceptual designs for a spent nuclear fuel system to Atucha I nuclear power plant. (author) [es

  6. Peer Review of the Waste Package Material Performance Interim Report

    International Nuclear Information System (INIS)

    J. A. Beavers; T. M. Devine, Jr.; G. S. Frankel; R. H. Jones; R. G. Kelly; R. M. Latanision; J. H. Payer

    2001-01-01

    At the request of the U.S. Department of Energy, Bechtel SAIC Company, LLC, formed the Waste Package Materials Performance Peer Review Panel (the Panel) to review the technical basis for evaluating the long-term performance of waste package materials in a proposed repository at Yucca Mountain, Nevada. This is the interim report of the Panel; a final report will be issued in February 2002. In its work to date, the Panel has identified important issues regarding waste package materials performance. In the remainder of its work, the Panel will address approaches and plans to resolve these issues. In its review to date, the Panel has not found a technical basis to conclude that the waste package materials are unsuitable for long-term containment at the proposed Yucca Mountain Repository. Nevertheless, significant technical issues remain unsettled and, primarily because of the extremely long life required for the waste packages, there will always be some uncertainty in the assessment. A significant base of scientific and engineering knowledge for assessing materials performance does exist and, therefore, the likelihood is great that uncertainty about the long-term performance can be substantially reduced through further experiments and analysis

  7. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  8. StormReady in a Box: Enhancing NOAA's Presence in Schools

    Science.gov (United States)

    Grondin, N. S.; Franks, C.

    2015-12-01

    The National Weather Service StormReady Supporter program exists to give schools, companies, TV stations, and other facilities the opportunity to earn recognition for their weather preparedness and awareness. Requirements to earn StormReady Supporter status include having a facility warning point, use of NOAA Weather Radios, and weather hazard Emergency Operation Plans. Despite the increasing importance of weather preparedness in schools, only 1.2% of Minnesota schools are deemed StormReady by the National Weather Service. It was determined that the major impedance for schools becoming StormReady Supporters is the lack of time for administrators to engage in anything "extra" beyond their listed duties. As part of a 2015 Hollings Scholar project, the StormReady in a Box concept was developed to remedy this, by empowering teachers and students to take charge and complete the StormReady Supporter application for their school. StormReady in a Box is a project developed for Junior High School students to learn about weather preparedness and to help their school acquire StormReady status. The project was designed to be relevant to the Minnesota State Education Standards in Science, be simple for teachers to do with their students, and most importantly, to be enjoyable for Junior High School age students to do. The project was also designed to enhance critical thinking skills and logical reasoning abilities, as they relate to the StormReady Supporter application. This presentation will present the overall rationale for the undertaking of this project, the creation of, and the logical next steps for the StormReady in a Box project.

  9. Expansion of storage capacity of interim spent fuel storage (MSVP) Bohunice

    International Nuclear Information System (INIS)

    Pilat, P.; Fridrich, V.

    2005-01-01

    This article describes modifications of Interim spent fuel storage, performed with aim of storage capacity expansion, seismic stability enhancement, and overall increase of service life as well as assuring of MSVP safe operation. Uniqueness of adopted technical solutions is based upon the fact that mentioned innovations and modifications were performed without any changes, neither in ground plan nor architecture of MSVP structure. It also important to mention that all modifications were performed during continual operation of MSVP without any breaks of limits or operational regulations. Reconstruction and innovation of existing construction and technological systems of MSVP has assured required quality standard comparable with actual trends. (authors)

  10. 226Ra out of use therapeutic needles and tubes interim storage

    International Nuclear Information System (INIS)

    Pavlovic, R.; Plecas, I.; Maksic, R.; Pavlovic, S.; Vukovic, S.

    1999-01-01

    When the main producers stopped production of radium in the 1960s, the total quantity of radium produced by the main refiners was estimated to be a few kg. Continuous progress concerning the knowledge of hazards associated with the use of a radioactive material, and the characteristics of most of the devices containing radium, calls for a well planned and carefully executed collection and ongoing management of those items under the direction of responsible authorities. Some aspects of the related to the packaging and interim storage of spent radium therapeutic sources are presented in this paper. (author)

  11. 78 FR 12243 - Interim Final Determination To Stay and Defer Sanctions, Placer County Air Pollution Control...

    Science.gov (United States)

    2013-02-22

    ...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The SIP revision concerns two permitting rules submitted by the PCAPCD and FRAQMD, respectively: Rule 502, New Source Review, and Rule 10.1, New Source Review.

  12. GRENADA. Renewables Readiness Assessment 2012

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    Grenada, like many Caribbean islands, is dependent on costly oil imports for its energy needs, including the generation of electricity. The transition to renewable energy could potentially support price reductions and improve the overall competitiveness of key sectors of the economy, particularly tourism. This report provides facts and analysis to support the country's discussion on ways to move forward with the renewable energy agenda. IRENA is ready to provide support in the implementation of the actions identified in this report.

  13. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  14. Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tartakovsky, Guzel D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Timothy C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chronister, Glen B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-01

    A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

  15. 77 FR 24857 - Interim Final Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The revisions concern SJVUAPCD Rule 4352, Solid Fuel Fired Boilers, Steam Generators and Process Heaters.

  16. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8

  17. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan (ed.) [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection

  18. Interim main report of the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Hedin, Allan

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10 -6 for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8. Hydrogeological

  19. Hierarchies of belief and interim rationalizability

    Directory of Open Access Journals (Sweden)

    Jeffrey C. Ely

    2006-03-01

    Full Text Available In games with incomplete information, conventional hierarchies of belief are incomplete as descriptions of the players' information for the purposes of determining a player's behavior. We show by example that this is true for a variety of solution concepts. We then investigate what is essential about a player's information to identify behavior. We specialize to two player games and the solution concept of interim rationalizability. We construct the universal type space for rationalizability and characterize the types in terms of their beliefs. Infinite hierarchies of beliefs over conditional beliefs, which we call Delta-hierarchies, are what turn out to matter. We show that any two types in any two type spaces have the same rationalizable sets in all games if and only if they have the same Delta-hierarchies.

  20. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  1. Safety regulations for radioisotopes, etc. (interim report)

    International Nuclear Information System (INIS)

    1980-01-01

    An (interim) report by an ad hoc expert committee to the Nuclear Safety Commission, on the safety regulations for radioisotopes, etc., was presented. For the utilization of radioisotopes, etc., there is the Law Concerning Prevention of Radiation Injury Due to Radioisotopes, etc. with the advances in this field and the improvement in international standards, the regulations by the law have been examined. After explaining the basic ideas of the regulations, the problems and countermeasures in the current regulations are described: legal system, rationalization in permission procedures and others, inspection on RI management, the system of the persons in charge of radiation handling, RI transport, low-level radioactive wastes, consumer goods, definitions of RIs, radiation and sealed sources, regulations by group partitioning, RI facilities, system of personnel exposure registration, entrusting of inspection, etc. to private firms, and reduction in the works for permission among governmental offices. (author)

  2. Hospitals’ Readiness to Implement Clinical Governance

    Directory of Open Access Journals (Sweden)

    Farbod Ebadi Fardazar

    2015-02-01

    Full Text Available Background Quality of health services is one of the most important factors for delivery of these services. Regarding the importance and vital role of quality in the health sector, a concept known as “Clinical Governance” (CG has been introduced into the health area which aims to enhance quality of health services. Thus, this study aimed to assess private and public hospitals’ readiness to implement CG in Iran. Methods This descriptive and cross-sectional study was carried out in 2012. Four hundred thirty participants including doctors, nurses, diagnostic departments personnel, and support staff were chosen randomly from four hospitals (equally divided into private and public hospitals. Clinical Governance Climate Questionnaire (CGCQ was used for data collection. Finally, data were entered into the SPSS 18 and were analyzed using statistical methods. Results Among the CG dimensions, “organizational learning” and “planned and integrated quality improvement program” scored the highest and the lowest respectively for both types of hospitals. Hospitals demonstrated the worst condition with regard to the latter dimension. Furthermore, both types of hospitals had positive picture regarding “training and development opportunities”. Private hospitals scored better than public ones in all dimensions but there was only a significant difference in “proactive risk management” dimension between both types of hospitals (P< 0.05. Conclusion Hospitals’ readiness for CG implementation was “average or weak”. In order to implement CG successfully, it is essential to have a quality-centered culture, a culture specified by less paperwork, more selfsufficiency, and flexibility in hospitals’ affairs as well as centring on shared vision and goals with an emphasis on continuous improvement and innovation.

  3. Evidence based practice readiness: A concept analysis.

    Science.gov (United States)

    Schaefer, Jessica D; Welton, John M

    2018-01-15

    To analyse and define the concept "evidence based practice readiness" in nurses. Evidence based practice readiness is a term commonly used in health literature, but without a clear understanding of what readiness means. Concept analysis is needed to define the meaning of evidence based practice readiness. A concept analysis was conducted using Walker and Avant's method to clarify the defining attributes of evidence based practice readiness as well as antecedents and consequences. A Boolean search of PubMed and Cumulative Index for Nursing and Allied Health Literature was conducted and limited to those published after the year 2000. Eleven articles met the inclusion criteria for this analysis. Evidence based practice readiness incorporates personal and organisational readiness. Antecedents include the ability to recognize the need for evidence based practice, ability to access and interpret evidence based practice, and a supportive environment. The concept analysis demonstrates the complexity of the concept and its implications for nursing practice. The four pillars of evidence based practice readiness: nursing, training, equipping and leadership support are necessary to achieve evidence based practice readiness. Nurse managers are in the position to address all elements of evidence based practice readiness. Creating an environment that fosters evidence based practice can improve patient outcomes, decreased health care cost, increase nurses' job satisfaction and decrease nursing turnover. © 2018 John Wiley & Sons Ltd.

  4. Irradiation of ready meals for microbial safety and shelf-life extension: 1. microbial quality of waakye and other other ready-to-eat meals

    International Nuclear Information System (INIS)

    Nketsia-Tabiri, J.; Adu-Gyamfi, A.; Owusu-Biney, A.

    2006-01-01

    Waakye bought from the open market and 14 meals prepared under the hazard analysis and critical control point (HACCP) plan were microbiologically investigated. The aerobic mesophilic count (AMC) (10 7 - 10 8 CFU g 1 ) and coliform count (10 6 - 10 7 CFU g -1 ) for complete waakye meals, including macaroni, fried fish, sauce and vegetable salad, exceeded the microbiological standards for such ready-to-eat meals. The AMC (10 1 - 10 4 CFU g 1 ) and coliform count (10 1 - 10 2 CFU g -1 ) for all the ready meals prepared under HACCP and stored (-5 to 0 0 C) for up to 5 days were within the standards. Potential pathogens isolated from waakye and the meals prepared under HACCP plan included Escherichia coli, Klebsiella spp., Serratia spp., and Enterobacter spp. Subsequent studies will exploit the potential of irradiation to eliminate pathogens and ensure the microbiological safety of ready-to-eat meals. (au)

  5. Strategic Review of Medical Training and Career Structure Interim Report

    OpenAIRE

    Department of Health (Ireland)

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  6. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  7. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  8. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  9. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  10. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  11. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    Science.gov (United States)

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  12. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  13. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  14. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  15. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  16. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  17. SaludABLEOmaha: improving readiness to address obesity through healthy lifestyle in a Midwestern Latino community, 2011-2013.

    Science.gov (United States)

    Frerichs, Leah; Brittin, Jeri; Robbins, Regina; Steenson, Sharalyn; Stewart, Catherine; Fisher, Christopher; Huang, Terry T-K

    2015-02-12

    A community's readiness for change is a precursor to the effective application of evidence-based practices for health promotion. Research is lacking regarding potential strategies to improve readiness to address obesity-related health issues in underserved communities. This case study describes SaludABLEOmaha, an initiative to increase readiness of residents in a Midwestern Latino community to address obesity and adopt healthy lifestyles. SaludABLEOmaha emphasized 2 core approaches, youth activism and collaboration among public and private institutions, which we applied to planning and implementing tactics in support of 3 interconnected strategies: 1) social marketing and social media, 2) service learning in schools (ie, curricula that integrate hands-on community service with instruction and reflection), and 3) community and business engagement. Following the Community Readiness Model protocol (http://triethniccenter.colostate.edu/communityReadiness.htm), structured interviews were conducted with community leaders and analyzed before and 2.5 years after launch of the program. The community increased in readiness from stage 3 of the Community Readiness Model, "vague awareness," at baseline to stage 5, "preparation," at follow-up. SaludABLEOmaha improved community readiness (eg, community knowledge, community climate), which probably contributed to the observed increase in readiness to address obesity through healthy lifestyle. Community mobilization approaches such as youth activism integrated with social marketing and social media tactics can improve community responsiveness to obesity prevention and diminish health disparities.

  18. SaludABLEOmaha: Improving Readiness to Address Obesity Through Healthy Lifestyle in a Midwestern Latino Community, 2011–2013

    Science.gov (United States)

    Frerichs, Leah; Brittin, Jeri; Robbins, Regina; Steenson, Sharalyn; Stewart, Catherine; Fisher, Christopher

    2015-01-01

    Background A community’s readiness for change is a precursor to the effective application of evidence-based practices for health promotion. Research is lacking regarding potential strategies to improve readiness to address obesity-related health issues in underserved communities. Community Context This case study describes SaludABLEOmaha, an initiative to increase readiness of residents in a Midwestern Latino community to address obesity and adopt healthy lifestyles. Methods SaludABLEOmaha emphasized 2 core approaches, youth activism and collaboration among public and private institutions, which we applied to planning and implementing tactics in support of 3 interconnected strategies: 1) social marketing and social media, 2) service learning in schools (ie, curricula that integrate hands-on community service with instruction and reflection), and 3) community and business engagement. Following the Community Readiness Model protocol (http://triethniccenter.colostate.edu/communityReadiness.htm), structured interviews were conducted with community leaders and analyzed before and 2.5 years after launch of the program. Outcome The community increased in readiness from stage 3 of the Community Readiness Model, “vague awareness,” at baseline to stage 5, “preparation,” at follow-up. Interpretation SaludABLEOmaha improved community readiness (eg, community knowledge, community climate), which probably contributed to the observed increase in readiness to address obesity through healthy lifestyle. Community mobilization approaches such as youth activism integrated with social marketing and social media tactics can improve community responsiveness to obesity prevention and diminish health disparities. PMID:25674679

  19. Readiness to change criminal women and men

    Directory of Open Access Journals (Sweden)

    Krzysztof Biel

    2017-12-01

    Full Text Available The readiness of offenders to social rehabilitation is a new category in our country. Meanwhile, the research conducted in many countries indicates its usefulness in the diagnosis and selection of participants of rehabilitation programmes. This entails more effective interaction with convicted persons and greater responsibility on the part of convicted people for their own social rehabilitation process. The aim of this article is to present the main assumptions and models of readiness for change and their usefulness in social rehabilitation practice and to present pilot studies of readiness for change among criminal women and men in Kraków. Application of the Polish adaptation of the CVTRQ questionnaire made it possible to determine the level of convicted persons’ readiness, taking into account deficits in particular scales of the questionnaire and variables differentiating the group of ready and not ready people. At the end, guidelines for further research will be presented.

  20. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  1. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  2. Librarian readiness for research partnerships.

    Science.gov (United States)

    Mazure, Emily S; Alpi, Kristine M

    2015-04-01

    This study investigated health sciences librarians' knowledge and skill-based readiness to partner on sponsored research involving human participants. The authors developed and deployed, at two time points, a web-based survey on nine indicators of research activities with response choices reflecting the transtheoretical model of stages of behavior change. Librarians with research experience or membership in the Medical Library Association Research Section reported higher levels of having completed indicators. Our results suggest that creating awareness in precontemplation responders could encourage skill development. Mentoring and continuing education could support librarians who are contemplating or preparing to perform indicator activities.

  3. NASA Technology Readiness Level Definitions

    Science.gov (United States)

    Mcnamara, Karen M.

    2012-01-01

    This presentation will cover the basic Technology Readiness Level (TRL) definitions used by the National Aeronautics and Space Administration (NASA) and their specific wording. We will discuss how they are used in the NASA Project Life Cycle and their effectiveness in practice. We'll also discuss the recent efforts by the International Standards Organization (ISO) to develop a broadly acceptable set of TRL definitions for the international space community and some of the issues brought to light. This information will provide input for further discussion of the use of the TRL scale in manufacturing.

  4. Readiness for banking technologies in developing countries

    African Journals Online (AJOL)

    Professor in the Department of Marketing Management, University of Johannesburg. ... From the organisation's perspective, it has been suggested ... technological readiness of developing countries' consumers, in an urban environment,.

  5. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    Energy Technology Data Exchange (ETDEWEB)

    Rowsell, David Leon [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2015-06-01

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  6. Safety report for Central Interim Storage facility for radioactive waste from small producers

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.

    2004-01-01

    In 1999 the Agency for Radwaste Management took over the management of the Central Interim Storage (CIS) in Brinje, intended only for radioactive waste from industrial, medical and research applications. With the transfer of the responsibilities for the storage operation, ARAO, the new operator of the facility, received also the request from the Slovenian Nuclear Safety Administration for refurbishment and reconstruction of the storage and for preparation of the safety report for the storage with the operational conditions and limitations. In order to fulfill these requirements ARAO first thoroughly reviewed the existing documentation on the facility, the facility itself and the stored inventory. Based on the findings of this review ARAO prepared several basic documents for improvement of the current conditions in the storage facility. In October 2000 the Plan for refurbishment and modernization of the CIS was prepared, providing an integral approach towards remediation and refurbishment of the facility, optimization of the inventory arrangement and modernization of the storage and storing utilization. In October 2001 project documentation for renewal of electric installations, water supply and sewage system, ventilation system, the improvements of the fire protection and remediation of minor defects discovered in building were completed according to the Act on Construction. In July 2003 the safety report was prepared, based on the facility status after the completion of the reconstruction works. It takes into account all improvements and changes introduced by the refurbishment and reconstruction of the facility according to project documentation. Besides the basic characteristics of the location and its surrounding, it also gives the technical description of the facility together with proposed solutions for the renewal of electric installations, renovation of water supply and sewage system, refurbishment of the ventilation system, the improvement of fire

  7. Assessing farmers' community readiness towards the enhancement of natural enemy population in rice fields in Malacca

    Science.gov (United States)

    Fairuz, K.; Idris, A. G.; Syahrizan, S.; Hatijah, K.

    2018-04-01

    Malacca has committed to be a green technology state by the year 2020. Agriculture is one of the main industries that have been highlighted to achieve this goal especially rice farming activities. Some limitations for this issue have restricted the accomplishment of the plan including pesticide usage among rice farmers. The use of chemicals in rice field need to be reduced significantly in order to support the goal. One of the indicators to the successfulness of pesticide reduction is the increasing numbers of natural enemies' species abundance and population in the rice field. Natural enemies were important to regulate pest populations in rice field naturally. Farmers' readiness to participate in this issue is very important to ensure the successfulness. The level of readiness of farmers' community will determine whether they are ready or not to execute the plan. Unfortunately, such information in rice farmers' community was not properly measured. Thus this study was aimed to assess the readiness level of rice farmers' community to change in order to enhance natural enemies in their rice field. This study was adapting the CR model as its theoretical framework. Three rice farming area in Malacca were involved in this study namely, Jasin, Melaka Tengah and Alor Gajah. Questionnaires were used as major instrument and were randomly distributed to 224 farmers. Data collected were tested for their reliability, significance and level of readiness. Knowledge of issue, knowledge of effort and resources dimensions were found influencing the readiness dimension significantly, whilst the attitude and leadership dimensions were not. Generally, the level of readiness for farmers' community in Malacca was found in the sixth or initial stage, where some of them initially have started to practice a few related activities to enhance the natural enemies' population in their rice field. Continuous support and assistant from the leaders and local authorities are crucially needed in

  8. Exploring the need for Transition Readiness Scales within cystic fibrosis services: A qualitative descriptive study.

    Science.gov (United States)

    Bourke, Mary; Houghton, Catherine

    2018-07-01

    To explore healthcare professionals' and patients' perceptions of the potential use of a Transition Readiness Scale in cystic fibrosis care. This included an examination of barriers and facilitators to its implementation along with the identification of key items to include in a Transition Readiness Scale. Due to increasing life expectancy and improved quality of life, more adolescents with cystic fibrosis are transitioning from paediatric to adult health care. To assess and correctly manage this transition, a more structured approach to transition is advocated. This can be achieved using a Transition Readiness Scale to potentially identify or target areas of care in which the adolescent may have poor knowledge. These key items include education, developmental readiness taking into account relationships, reproduction, future plans and self-management skills. Existing tools to gauge readiness concentrate mainly on education and self-care needs assessment as their key items. Currently, there is no specific cystic fibrosis Transition Readiness Scale in use in Ireland or internationally. The study used a descriptive qualitative design. Data were collected using semi-structured interviews (n = 8) and analysed using a thematic approach. The findings identified the potential benefits of this tool and second the resources which need to be in place before its development and implementation into cystic fibrosis services. Transition Readiness Scales have substantial relevance with cystic fibrosis services emphasising the importance of establishing the necessary resources prior to its implementation. These were identified as more staff, a dedicated private space and staff training and education. Significant resources are needed to fully integrate Transition Readiness Scales in practice. The study findings suggest multidisciplinary collaborations, and patient engagement is pivotal in planning and easing the transition process for adolescents with cystic fibrosis. © 2018 The

  9. Ready or Not...? Teen Sexuality and the Troubling Discourse of Readiness

    Science.gov (United States)

    Ashcraft, Catherine

    2006-01-01

    In this article, I explore how talk about being "ready" or "not ready" for sex shapes teen and adult understandings of sexuality. I argue that this "discourse of readiness" poses serious threats to teens' identity development, sexual decision making, and educators efforts to help them through these processes. To illustrate, I draw from my…

  10. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  11. 77 FR 26987 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-05-08

    ... ETCs and incumbent LECs serving competitive areas, disaggregation plans (which permit incumbent LECs to...'' exception to the interim cap for competitive ETCs. The interim cap limited the total annual amount of high-cost support competitive ETCs in any state could receive to the amount competitive ETCs in that state...

  12. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  13. Interim Basis for PCB Sampling and Analyses

    International Nuclear Information System (INIS)

    BANNING, D.L.

    2001-01-01

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the US. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposal approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QAlG4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842/Rev.1 A, Vol. IV, Section 4.16 (Banning 1999)

  14. The EMEFS model evaluation. An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  15. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  16. The Costly Consequences of not Being Socially and Behaviorally Ready to Learn by Kindergarten in Baltimore City.

    Science.gov (United States)

    Bettencourt, Amie F; Gross, Deborah; Ho, Grace; Perrin, Nancy

    2018-02-01

    Social, emotional, and behavioral skills are foundational to learning and long-term success. However, poverty and exposure to adverse childhood experiences reduce the chances of children entering kindergarten socially-behaviorally ready to learn. This study examined the unique impact of 5-year-old children (N = 11,412) entering kindergarten not socially-behaviorally ready on three costly school outcomes by fourth grade in Baltimore City Public Schools: being retained in grade, receiving services and supports through an IEP or 504 plan, and being suspended/expelled. Controlling for all other types of school readiness, students not identified as socially-behaviorally ready for kindergarten were more likely to experience all three school outcomes. Findings underscore the importance of early prevention and intervention strategies targeting parents and social-behavioral readiness skills during the first 5 years of life.

  17. Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  18. Basis for Interim Operation for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2003-01-01

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  19. LDEF materials: An overview of the interim findings

    International Nuclear Information System (INIS)

    Stein, B.A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effect (SEE) on materials that are unparalleled in the history of the U.S. space program. The 5.8-year flight of LDEF greatly enhanced the potential value of materials data from LDEF to the international SEE community, compared to that of the original 1-year flight plan. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials of the same space vehicle. NASA recognized the potential by forming the LDEF Space Environmental Effects on Materials Special Investigation Group (MSIG) to address the greatly expanded materials and LEO space environment parameter analysis opportunities available in the LDEF structure, experiment trays, and corollary measurements, so that the combined value of all LDEF materials data to current and future space missions will be assessed and documented. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. These revelations are based on observations of LEO environmental effects on materials made in-space during LDEF retrieval and during LDEF tray deintegration at the Kennedy Space Center, and on findings of approximately 1.5 years of laboratory analyses of LDEF materials by the LDEF materials scientists. These findings were extensively reviewed and discussed at the MSIG-sponsored LDEF Materials Workshop '91. The results are presented in a format which categorizes the revelations as clear findings or confusing/unexplained findings and resultant needs for new space materials developments and ground simulation testing/analytical modeling

  20. E-Area Performance Assessment Interim Measures Assessment FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  1. From Readiness to Action: How Motivation Works

    Directory of Open Access Journals (Sweden)

    Kruglanski Arie W.

    2014-09-01

    Full Text Available We present a new theoretical construct labeled motivational readiness. It is defined as the inclination, whether or not ultimately implemented, to satisfy a desire. A general model of readiness is described which builds on the work of prior theories, including animal learning models and personality approaches, and which aims to integrate a variety of research findings across different domains of motivational research. Components of this model include the Want state (that is, an individual’s currently active desire, and the Expectancy of being able to satisfy that Want. We maintain that the Want concept is the critical ingredient in motivational readiness: without it, readiness cannot exist. In contrast, some motivational readiness can exist without Expectancy. We also discuss the role of incentive in motivational readiness. Incentive is presently conceived of in terms of a Match between a Want and a Perceived Situational Affordance. Whereas in classic models incentive was portrayed as a first order determinant of motivational readiness, here we describe it as a second order factor which affects readiness by influencing Want, Expectancy, or both. The new model’s relation to its theoretical predecessors, and its implications for future research, also are discussed.

  2. Universal School Readiness Screening at Kindergarten Entry

    Science.gov (United States)

    Quirk, Matthew; Dowdy, Erin; Dever, Bridget; Carnazzo, Katherine; Bolton, Courtney

    2018-01-01

    Researchers examined the concurrent and predictive validity of a brief (12-item) teacher-rated school readiness screener, the Kindergarten Student Entrance Profile (KSEP), using receiver operating characteristic (ROC) curve analysis to examine associations between (N = 78) children's social-emotional (SE) and cognitive (COG) readiness with…

  3. Overview: Texas College and Career Readiness Standards

    Science.gov (United States)

    Texas Higher Education Coordinating Board, 2009

    2009-01-01

    The Texas College and Career Readiness Standards define what students should know and be able to accomplish in order to succeed in entry-level college courses or skilled workforce opportunities upon graduation from high school. This paper answers the following questions: (1) Who developed the Texas College and Career Readiness Standards?; (2) What…

  4. Understanding Early Educators' Readiness to Change

    Science.gov (United States)

    Peterson, Shira M.

    2012-01-01

    Researchers in the fields of humanistic psychology, counseling, organizational change, and implementation science have been asking a question that is at the heart of today's early care and education quality improvement efforts: When it comes to changing one's behavior, what makes a person ready to change? Although the concept of readiness to…

  5. Solar Sail Propulsion Technology Readiness Level Database

    Science.gov (United States)

    Adams, Charles L.

    2004-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 solar sail system design and development hardware demonstration activities over the past 20 months. Able Engineering Company (AEC) of Goleta, CA is leading one team and L Garde, Inc. of Tustin, CA is leading the other team. Component, subsystem and system fabrication and testing has been completed successfully. The goal of these activities is to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by 2006. These activities will culminate in the deployment and testing of 20-meter solar sail system ground demonstration hardware in the 30 meter diameter thermal-vacuum chamber at NASA Glenn Plum Brook in 2005. This paper will describe the features of a computer database system that documents the results of the solar sail development activities to-date. Illustrations of the hardware components and systems, test results, analytical models, relevant space environment definition and current TRL assessment, as stored and manipulated within the database are presented. This database could serve as a central repository for all data related to the advancement of solar sail technology sponsored by the ISPT, providing an up-to-date assessment of the TRL of this technology. Current plans are to eventually make the database available to the Solar Sail community through the Space Transportation Information Network (STIN).

  6. Roadmap for an EArth Defense Initiative (READI)

    Science.gov (United States)

    Burke, J. D.; Hussain, A.; Soni, A.; Johnson-Freese, J.; Faull, J.; Schmidt, N.; Wilson, T.; Thangavelu, M.

    2015-12-01

    During the 2015 Space Studies Program of the International Space University, a team of thirty-four participants from seventeen countries carried out a team project on the subject of planetary defense against near-Earth object impacts. The READI Project presents the components of a complete architecture representing practical future strategies and methods for protecting our planet and life as we know it. The findings and recommendations of the project are as follows: for detection and tracking, add infrared instruments in space and radar in Earth's southern hemisphere, as well as dedicated ground telescopes and a program for spectroscopic and other characterization of asteroids and comets; for deflection, develop and space-qualify kinetic and nuclear interceptors, as well as long-range laser ablators; for education and outreach, develop programs aimed at the cohort of children aged 6-15 and their parents; and for evacuation and recovery, provide distributed shelters and increased emergency planning. The project recognizes that the enactment of any deflection strategy would require significant international collaboration; thus, we recommend the formation of a Mitigation Action Group (MAG) in addition to the existing organizations IAWN and SMPAG. The MAG should be chartered to recommend deflection strategies to the UN Security Council in the event of an imminent NEO impact and, upon approval, to lead international deflection action.

  7. Community-Wide Zero Energy Ready Home Standard

    Energy Technology Data Exchange (ETDEWEB)

    Herk, A. [IBACOS, Inc., Pittsburght, PA (United States); Beggs, T. [IBACOS, Inc., Pittsburght, PA (United States)

    2016-02-05

    This report outlines the steps a developer can use when looking to create and implement higher performance standards such as the U.S. Department of Energy (DOE) Zero Energy Ready Home (ZERH) standards in a community. The report also describes the specific examples of how this process was followed by a developer, Forest City, in the Stapleton community in Denver, Colorado. IBACOS described the steps used to begin to bring the DOE ZERH standard to the Forest City Stapleton community based on 15 years of community-scale development work done by IBACOS. As a result of this prior IBACOS work, the team gained an understanding of the various components that a master developer needs to consider and created strategies for incorporating those components in the initial phases of development to achieve higher performance buildings in the community. An automated scoring system can be used to perform an internal audit that provides a detailed and consistent evaluation of how several homes under construction or builders' floor plans compare with the requirements of the DOE Zero Energy Ready Home program. This audit can be performed multiple times at specific milestones during construction to allow the builder to make changes as needed throughout construction for the project to meet Zero Energy Ready Home standards. This scoring system also can be used to analyze a builder's current construction practices and design.

  8. Lightning Arrestor Connectors Production Readiness

    Energy Technology Data Exchange (ETDEWEB)

    Marten, Steve; Linder, Kim; Emmons, Jim; Gomez, Antonio; Hasam, Dawud; Maurer, Michelle

    2008-10-20

    The Lightning Arrestor Connector (LAC), part “M”, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of the LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.

  9. Teenage employment and career readiness.

    Science.gov (United States)

    Greene, Kaylin M; Staff, Jeremy

    2012-01-01

    Most American youth hold a job at some point during adolescence, but should they work? This article presents a broad overview of teenage employment in the United States. It begins by describing which teenagers work and for how long and then focuses attention on the consequences (both good and bad) of paid work in adolescence. It then presents recent nationally representative data from the Monitoring the Future Study suggesting that limited hours of paid work do not crowd out developmentally appropriate after-school activities. A review of the literature also supports the idea that employment for limited hours in good jobs can promote career readiness and positive development. The article concludes with a discussion of the implications of youth work for practitioners and policymakers who are delivering career-related programming. Copyright © 2012 Wiley Periodicals, Inc., A Wiley Company.

  10. MIBS breadboard ready for testing

    Science.gov (United States)

    Leijtens, Johan; de Goeij, Bryan; Boslooper, Erik

    2017-11-01

    MIBS is a spectrometer operating in the thermal infrared wavelength region, designed in frame of the phase A study for the ESA EarthCARE mission as part of the multispectral Imaging instrument MSI, which uses a 2D microbolometer array detector in stead of the more common MCT detectors. Utilization of a microbolometer and using an integrated calibration system, results in a sensor with a size and mass reduction of at least an order of magnitude when compared to currently flying instruments with similar spectral resolution. In order to demonstrate feasiblity a breadboard has been designed, which will be build and aligned in 2006 and will be ready for testing the forth quarter of 2006.

  11. Defense Treaty Inspection Readiness Program

    International Nuclear Information System (INIS)

    Cronin, J.J.; Kohen, M.D.; Rivers, J.D.

    1996-01-01

    The Defense Treaty Inspection Readiness Program (DTIRP) was established by the Department of Defense in 1990 to assist defense facilities in preparing for treaty verification activities. Led by the On-Site Inspection Agency (OSIA), an element of the Department of Defense, DTIRP''s membership includes representatives from other Department of Defense agencies, the Department of Energy (DOE), the Central Intelligence Agency, the Federal Bureau of Investigation, the Department of Commerce, and others. The Office of Safeguards and Security has a significant interest in this program, due to the number of national defense facilities within its purview that are candidates for future inspections. As a result, the Office of Safeguards and Security has taken a very active role in DTIRP. This paper discusses the Office of Safeguards and Security''s increasing involvement in various elements of the DTIRP, ranging from facility assessments to training development and implementation

  12. Utility shopping: are consumers ready?

    International Nuclear Information System (INIS)

    Barrados, A.

    1999-01-01

    This report provides an overview of public readiness to deal with deregulation of the electric power industry , based on an analysis of public reaction to the deregulation of the transportation, telecommunications and natural gas industries which already have taken place. The report also examines the reasons why residential consumers have reason to be wary of deregulation. These include the likelihood of slow development of the intended competition, the consequent limits on consumer choices, the possibility of increased prices, decreased quality of service and erosion of social values such as affordability and accessibility. The report concludes with a number of recommendations aimed at ensuring the existence of workable competition for residential consumers, that reliable and meaningful information is available as competition in deregulated markets gets underway, that independent sources of information are widely available, and that basic consumer protection against deceptive and borderline marketing practices, a regulatory oversight mechanism and public reporting mechanisms are in place before competition begins. 33 refs

  13. TMI-2 core-examination program: INEL facilities readiness study

    International Nuclear Information System (INIS)

    McLaughlin, T.B.

    1983-02-01

    This report reviews the capability and readiness of remote handling facilities at the Idaho National Engineering Laboratory (INEL) to receive, and store the TMI-2 core, and to examine and analyze TMI-2 core samples. To accomplish these objectives, the facilities must be able to receive commercial casks, unload canisters from the casks, store the canisters, open the canisters, handle the fuel debris and assemblies, and perform various examinations. The report identifies documentation, including core information, necessary to INEL before receiving the entire TMI-2 core. Also identified are prerequisites to INEL's receipt of the first canister: costs, schedules, and a preliminary project plan for the tasks

  14. Interim summary report of the safety case 2009

    International Nuclear Information System (INIS)

    2010-03-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy), Posiva is preparing to submit a construction license application for the final disposal spent nuclear fuel at the Olkiluoto site, Finland, by the end of the year 2012. Disposal will take place in a geological repository implemented according to the KBS-3 method. The long-term safety section supporting the license application will be based on a safety case that, according to the internationally adopted definition, will be a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. The present Interim Summary Report represents a major contribution to the development of this safety case. The report has been compiled in accordance with Posiva's current plan for preparing this safety case. A full safety case for the KBS-3V variant will be developed to support the Preliminary Safety Assessment Report (PSAR) in 2012. The report outlines the current design and safety concept for the planned repository. It summarises the approach used to formulate scenarios for the evolution of the disposal system over time, describes these scenarios and presents the main models and computer codes used to analyse them. It also discusses compliance with Finnish regulatory requirements for long-term safety of a geological repository and gives the main evidence, arguments and analyses that lead to confidence, on the part of Posiva, in the long-term safety of the planned repository. Current understanding of the evolution of the disposal system indicates that, except a few unlikely circumstances affecting a small number of canisters, spent fuel will remain isolated, and the radionuclides contained within the canisters, for hundreds of thousands of years or more, in accordance with the base scenario. Confidence in this base scenario derives, in the first place, from the

  15. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  16. Next Generation Melter Optioneering Study - Interim Report

    International Nuclear Information System (INIS)

    Gray, M.F.; Calmus, R.B.; Ramsey, G.; Lomax, J.; Allen, H.

    2010-01-01

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D 2 0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  17. Are they ready? Organizational readiness for change among clinical teaching teams.

    Science.gov (United States)

    Bank, Lindsay; Jippes, Mariëlle; Leppink, Jimmie; Scherpbier, Albert Jja; den Rooyen, Corry; van Luijk, Scheltus J; Scheele, Fedde

    2017-01-01

    Curriculum change and innovation are inevitable parts of progress in postgraduate medical education (PGME). Although implementing change is known to be challenging, change management principles are rarely looked at for support. Change experts contend that organizational readiness for change (ORC) is a critical precursor for the successful implementation of change initiatives. Therefore, this study explores whether assessing ORC in clinical teaching teams could help to understand how curriculum change takes place in PGME. Clinical teaching teams in hospitals in the Netherlands were requested to complete the Specialty Training's Organizational Readiness for curriculum Change, a questionnaire to measure ORC in clinical teaching teams. In addition, change-related behavior was measured by using the "behavioral support-for-change" measure. A two-way analysis of variance was performed for all response variables of interest. In total, 836 clinical teaching team members were included in this study: 288 (34.4%) trainees, 307 (36.7%) clinical staff members, and 241 (28.8%) program directors. Overall, items regarding whether the program director has the authority to lead scored higher compared with the other items. At the other end, the subscales "management support and leadership," "project resources," and "implementation plan" had the lowest scores in all groups. The study brought to light that program directors are clearly in the lead when it comes to the implementation of educational innovation. Clinical teaching teams tend to work together as a team, sharing responsibilities in the implementation process. However, the results also reinforce the need for change management support in change processes in PGME.

  18. Readiness of communities to engage with childhood obesity prevention initiatives in disadvantaged areas of Victoria, Australia.

    Science.gov (United States)

    Cyril, Sheila; Polonsky, Michael; Green, Julie; Agho, Kingsley; Renzaho, Andre

    2017-07-01

    . However, no studies in Australia have assessed disadvantaged communities' readiness to engage in obesity prevention initiatives. What does this paper add? This paper addresses the current gap in the knowledge of disadvantaged communities' level of readiness to engage in childhood obesity prevention initiatives in Australia. The study also identified the key factors responsible for low readiness of disadvantaged communities to participate in current childhood obesity prevention services. By using the Community Readiness model this study shows the readiness levels specific to the various dimensions of the model; Understanding dimension-specific readiness allows us to identify strategies that are tailored to each dimension, as guided by the model. What are the implications for practitioners? With the increasing burden of childhood obesity on disadvantaged communities, policymakers and health practitioners are facing a crisis in obesity prevention and management. Almost every year, new interventions are being planned and implemented. However if the target communities are not ready to participate in the available interventions these efforts are futile. This study exposes the key factors responsible for low readiness to participate in current obesity prevention services by disadvantaged communities. Addressing these key factors and improving readiness before designing new interventions will improve the participation of disadvantaged communities in those interventions. The study findings ultimately have the potential of reducing obesity-related disparities in Australia.

  19. Planning applications in image analysis

    Science.gov (United States)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1994-01-01

    We describe two interim results from an ongoing effort to automate the acquisition, analysis, archiving, and distribution of satellite earth science data. Both results are applications of Artificial Intelligence planning research to the automatic generation of processing steps for image analysis tasks. First, we have constructed a linear conditional planner (CPed), used to generate conditional processing plans. Second, we have extended an existing hierarchical planning system to make use of durations, resources, and deadlines, thus supporting the automatic generation of processing steps in time and resource-constrained environments.

  20. Predicting consumers’ intention to purchase ready- to-eat meals: The role of moral attitude

    NARCIS (Netherlands)

    Olsen, N.V.; Sijtsema, S.J.; Hall, G.

    2010-01-01

    This study investigates the usefulness of integrating moral attitude into the Theory of Planned Behavior (TPB) model when predicting intention to consume ready-to-eat (RTE) meals. Questionnaire data were gathered in three countries: Norway (N = 112), The Netherlands (N = 99), and Finland (N = 134)

  1. Pupils' Readiness for Self-Regulated Learning in the Forethought Phase of Exploratory Production

    Science.gov (United States)

    Metsärinne, Mika; Kallio, Manne; Virta, Kalle

    2015-01-01

    This article discusses pupils' readiness for self-regulation in Exploratory Production in Technology Education. In the forethought phase of Exploratory Production, pupils envision and regulate their technological production activities. Next, in the performance phase, the envisioned goals are tried and implemented through ideating, planning and…

  2. DOE Zero Energy Ready Home Case Study: Mandalay Homes — Pronghorn Ranch, Prescott Valley, AZ

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    The builder has certified 20 homes to DOE Zero Energy Ready Home program and plans are underway for 50 more. Winner of a Production Builder prize in the 2014 Housing Innovation Awards, the homes achieved a HERS score of 48 without photovoltaics (PV) or HERS 25 with 3.5 kW PV included.

  3. An assessment of the readiness for introduction of the HPV vaccine ...

    African Journals Online (AJOL)

    Formative research assessing human papillomavirus (HPV) vaccine readiness in Uganda was conducted in 2007. The objective was to generate evidence for government decision-making and operational planning for HPV vaccine introduction. Qualitative research methods with children, parents, teachers, community ...

  4. Mapping Fiscal Resources in South Hampton Roads Virginia to Support School Readiness. Regional Summary

    Science.gov (United States)

    Finance Project, 2009

    2009-01-01

    In 2007, committees of key stakeholders in the five cities of Chesapeake, Norfolk, Suffolk, Portsmouth, and Virginia Beach developed Collaborative Action Plans focused on key strategies to ensure that children in each city "arrive at kindergarten healthy and ready to succeed in school, and in life." With leadership from Smart Beginnings…

  5. Readiness for hospital discharge: A concept analysis.

    Science.gov (United States)

    Galvin, Eileen Catherine; Wills, Teresa; Coffey, Alice

    2017-11-01

    To report on an analysis on the concept of 'readiness for hospital discharge'. No uniform operational definition of 'readiness for hospital discharge' exists in the literature; therefore, a concept analysis is required to clarify the concept and identify an up-to-date understanding of readiness for hospital discharge. Clarity of the concept will identify all uses of the concept; provide conceptual clarity, an operational definition and direction for further research. Literature review and concept analysis. A review of literature was conducted in 2016. Databases searched were: Academic Search Complete, CINAHL Plus with Full Text, PsycARTICLES, Psychology and Behavioural Sciences Collection, PsycINFO, Social Sciences Full Text (H.W. Wilson) and SocINDEX with Full Text. No date limits were applied. Identification of the attributes, antecedents and consequences of readiness for hospital discharge led to an operational definition of the concept. The following attributes belonging to 'readiness for hospital discharge' were extracted from the literature: physical stability, adequate support, psychological ability, and adequate information and knowledge. This analysis contributes to the advancement of knowledge in the area of hospital discharge, by proposing an operational definition of readiness for hospital discharge, derived from the literature. A better understanding of the phenomenon will assist healthcare professionals to recognize, measure and implement interventions where necessary, to ensure patients are ready for hospital discharge and assist in the advancement of knowledge for all professionals involved in patient discharge from hospital. © 2017 John Wiley & Sons Ltd.

  6. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  7. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  8. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  9. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Honeyman, J.O.

    1998-01-01

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  10. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Certa, P.J.

    1998-01-01

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  11. Safety Consideration for a Wet Interim Spent Fuel Store at Conceptual Design Stage

    International Nuclear Information System (INIS)

    Astoux, Marion

    2014-01-01

    EDF Energy plans to build and operate two UK EPRs at the Hinkley Point C (HPC) site in Somerset, England. Spent fuel from the UK EPRs will need to be managed from the time it is discharged from the reactor until it is ultimately disposed of and this will involve storing the spent fuel for a period in the fuel building and thereafter in a dedicated interim facility until it can be emplaced within the UK Geological Disposal Facility. EDF Energy has proposed that this interim store should be located on the Hinkley Point site which is consistent with UK policy. This Interim Spent Fuel Store (ISFS) will have the capability to store for at least one hundred years the spent fuel arising from the operation of the two EPR units (sixty years operation). Therefore, specificities regarding the lifetime of the facility have to be accounted for its design. The choice of interim storage technology was considered in some depth for the HPC project and wet storage (pool) was selected. The facility is currently at conceptual design stage, although its construction will be part of main site construction phase. Safety functions and safety requirements for this storage facility have been defined, in compliance with WENRA 'Waste and Spent Fuel Storage - Safety Reference Level Report' and IAEA Specific Safety Guide no. 15 'Storage of Spent Nuclear Fuel'. EDF technical know-how, operational feedback on existing storage pools, UK regulatory context and Fukushima experience feedback have also been accounted for. Achievement of the safety functions as passively as reasonably practicable is a key issue for the design, especially in accident situations. Regarding lifetime aspects, ageing management of equipments, optimisation of the refurbishment, climate change, passivity of the facility, and long-term achievement of the safety functions are among the subjects to consider. Adequate Operational Limits and Conditions will also have to be defined, to enable the long-term achievement of the safety

  12. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  13. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  14. Advanced Exploration Systems Water Architecture Study Interim Results

    Science.gov (United States)

    Sargusingh, Miriam J.

    2013-01-01

    The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems that enable NASA human exploration missions beyond low Earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near-term missions beyond LEO. The secondary objective is to continue to advance mid-readiness-level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near- and long-term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit Environmental Control and Life Support Systems definition. This study is being performed in three phases. Phase I established the scope of the study through definition of the mission requirements and constraints, as well as identifying all possible WRS configurations that meet the mission requirements. Phase II focused on the near-term space exploration objectives by establishing an International Space Station-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long-term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.

  15. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described

  16. Criteria for Corrosion Protection of Aluminum-Clad Spent Nuclear Fuel in Interim Wet Storage

    International Nuclear Information System (INIS)

    Howell, J.P.

    1999-01-01

    Storage of aluminum-clad spent nuclear fuel at the Savannah River Site (SRS) and other locations in the U. S. and around the world has been a concern over the past decade because of the long time interim storage requirements in water. Pitting corrosion of production aluminum-clad fuel in the early 1990''s at SRS was attributed to less than optimum quality water and corrective action taken has resulted in no new pitting since 1994. The knowledge gained from the corrosion surveillance testing and other investigations at SRS over the past 8 years has provided an insight into factors affecting the corrosion of aluminum in relatively high purity water. This paper reviews some of the early corrosion issues related to aluminum-clad spent fuel at SRS, including fundamentals for corrosion of aluminum alloys. It updates and summarizes the corrosion surveillance activities supporting the future storage of over 15,000 research reactor fuel assemblies from countries over the world during the next 15-20 years. Criteria are presented for providing corrosion protection for aluminum-clad spent fuel in interim storage during the next few decades while plans are developed for a more permanent disposition

  17. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  18. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  19. A theory of organizational readiness for change

    Directory of Open Access Journals (Sweden)

    Weiner Bryan J

    2009-10-01

    Full Text Available Abstract Background Change management experts have emphasized the importance of establishing organizational readiness for change and recommended various strategies for creating it. Although the advice seems reasonable, the scientific basis for it is limited. Unlike individual readiness for change, organizational readiness for change has not been subject to extensive theoretical development or empirical study. In this article, I conceptually define organizational readiness for change and develop a theory of its determinants and outcomes. I focus on the organizational level of analysis because many promising approaches to improving healthcare delivery entail collective behavior change in the form of systems redesign--that is, multiple, simultaneous changes in staffing, work flow, decision making, communication, and reward systems. Discussion Organizational readiness for change is a multi-level, multi-faceted construct. As an organization-level construct, readiness for change refers to organizational members' shared resolve to implement a change (change commitment and shared belief in their collective capability to do so (change efficacy. Organizational readiness for change varies as a function of how much organizational members value the change and how favorably they appraise three key determinants of implementation capability: task demands, resource availability, and situational factors. When organizational readiness for change is high, organizational members are more likely to initiate change, exert greater effort, exhibit greater persistence, and display more cooperative behavior. The result is more effective implementation. Summary The theory described in this article treats organizational readiness as a shared psychological state in which organizational members feel committed to implementing an organizational change and confident in their collective abilities to do so. This way of thinking about organizational readiness is best suited for

  20. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project's cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion

  1. Year 2000 readiness for Tepco's nuclear power plants

    International Nuclear Information System (INIS)

    Tachibana, N.; Tomioka, Y.

    2000-01-01

    In line with our policy of positioning the Year 2000 (Y2K) problem as a major management task, we have performed Y2K readiness. We started to survey the influence of Y2K problem at Nuclear Power Plants (NPP) on February, 1996, and completed Y2K ready of NPP on October, 1999. This paper presents Y2K readiness of our NPP. Our NPP instrumentation and control can be roughly divided into two types (Monitoring System showing NPP's status, Control System to control equipment of NPP). We surveyed hardware and software of these systems to assess the influence of these systems by Y2K problem. For survey of hardware, we picked up all chips of Real Time Clock (RTC) with check of the lists of all parts on board. And we surveyed integrity to Y2K problem of picked up RTCs with their specification, instruction manual and so on. For survey of software, we picked up the system using a time parameter in software with check of system's source program. And we surveyed whether the system using a time parameter had functions that were influenced by Y2K problem. As the result of the survey, for both monitoring systems and control systems, there was no RTC chip having Y2K problem. And there was no control system with software modification required. It was confirmed that some of Monitoring Systems were required software modification. The modification of these systems was completed by October, 1999. We performed Simulated Test of Y2K to validate the result of survey and software modification. Simulated Test was performed for the confirmation of the system integrity when the system was input critical dates of Y2K problem. As the result of Simulated Test, there was no system that was confirmed the failure of survey and software modification. In addition to these Y2K readiness, referring to the existing contingency plan for emergency situations such as a system failure and a natural disaster like earthquakes and typhoons, we have completed contingency planning for Y2K. It is decided in

  2. Agro 13 No 3 Ready

    African Journals Online (AJOL)

    processing cost and revenue for the 2011/2012 planting season were collected and a simulated. 10-year .... blender, fertilizer, herbicide, seedling planting, Planning and management (logistic), Risk .... Fertilizer application 2 man-day 2,000.

  3. Information Assurance and Forensic Readiness

    Science.gov (United States)

    Pangalos, Georgios; Katos, Vasilios

    Egalitarianism and justice are amongst the core attributes of a democratic regime and should be also secured in an e-democratic setting. As such, the rise of computer related offenses pose a threat to the fundamental aspects of e-democracy and e-governance. Digital forensics are a key component for protecting and enabling the underlying (e-)democratic values and therefore forensic readiness should be considered in an e-democratic setting. This position paper commences from the observation that the density of compliance and potential litigation activities is monotonically increasing in modern organizations, as rules, legislative regulations and policies are being constantly added to the corporate environment. Forensic practices seem to be departing from the niche of law enforcement and are becoming a business function and infrastructural component, posing new challenges to the security professionals. Having no a priori knowledge on whether a security related event or corporate policy violation will lead to litigation, we advocate that computer forensics need to be applied to all investigatory, monitoring and auditing activities. This would result into an inflation of the responsibilities of the Information Security Officer. After exploring some commonalities and differences between IS audit and computer forensics, we present a list of strategic challenges the organization and, in effect, the IS security and audit practitioner will face.

  4. Enhancing Mental Readiness in Military Personnel

    National Research Council Canada - National Science Library

    Thompson, Megan M; McCreary, Donald R

    2006-01-01

    In this paper we explore how the psychological literature on stress and coping might inform military training programs to enhance "mental readiness" as a method to develop the baseline psychological...

  5. Some Thoughts on Systematic Reading Readiness Instruction.

    Science.gov (United States)

    Palardy, J. Michael

    1984-01-01

    Examines four specific areas of reading readiness--visual discrimination, visual memory, auditory discrimination, and auditory comprehension--and reviews teaching strategies in each of the four areas. (FL)

  6. University Research Initiative Program for Combat Readiness

    Science.gov (United States)

    1999-05-01

    microscope image of one of the lenses. This array was selected for testing because it is fabricated in a relatively inexpensive polyacrylic material, the...potent analogues of the potassium -sparing diuretic, amiloride. However, our results 179 University Reasearch Initiative for Combat Readiness Annual Report...for Combat Readiness Annual Report for the period June 1, 1998 - June 30, 1999 Roger H. Sawyer University of South Carolina Columbia, SC 29208 May

  7. Solar Training Network and Solar Ready Vets

    Energy Technology Data Exchange (ETDEWEB)

    Dalstrom, Tenley Ann

    2016-09-14

    In 2016, the White House announced the Solar Ready Vets program, funded under DOE's SunShot initiative would be administered by The Solar Foundation to connect transitioning military personnel to solar training and employment as they separate from service. This presentation is geared to informing and recruiting employer partners for the Solar Ready Vets program, and the Solar Training Network. It describes the programs, and the benefits to employers that choose to connect to the programs.

  8. Making Technology Ready: Integrated Systems Health Management

    Science.gov (United States)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  9. How Satellites Have Contributed to Building a Weather Ready Nation

    Science.gov (United States)

    Lapenta, W.

    2017-12-01

    NOAA's primary mission since its inception has been to reduce the loss of life and property, as well as disruptions from, high impact weather and water-related events. In recent years, significant societal losses resulting even from well forecast extreme events have shifted attention from the forecast alone toward ensuring societal response is equal to the risks that exist for communities, businesses and the public. The responses relate to decisions ranging from coastal communities planning years in advance to mitigate impacts from rising sea level, to immediate lifesaving decisions such as a family seeking adequate shelter during a tornado warning. NOAA is committed to building a "Weather-Ready Nation" where communities are prepared for and respond appropriately to these events. The Weather-Ready Nation (WRN) strategic priority is building community resilience in the face of increasing vulnerability to extreme weather, water, climate and environmental threats. To build a Weather-Ready Nation, NOAA is enhancing Impact-Based Decision Support Services (IDSS), transitioning science and technology advances into forecast operations, applying social science research to improve the communication and usefulness of information, and expanding its dissemination efforts to achieve far-reaching readiness, responsiveness and resilience. These four components of Weather-Ready Nation are helping ensure NOAA data, products and services are fully utilized to minimize societal impacts from extreme events. Satellite data and satellite products have been important elements of the national Weather Service (NWS) operations for more than 40 years. When one examines the uses of satellite data specific to the internal forecast and warning operations of NWS, two main applications are evident. The first is the use of satellite data in numerical weather prediction models; the second is the use of satellite imagery and derived products for mesoscale and short-range weather warning and

  10. Financial Improvement and Audit Readiness (FIAR) Plan Status Report

    Science.gov (United States)

    2011-05-01

    depreciation must include the cost of significant amounts of costly government furnished material (e.g., titanium hardware) and equipment (e.g., aircraft...Figure I-1. DoD Mission Critical Assets (FY 2010 $ in Millions)  Asset Type  Historical Cost  Accumulated  Depreciation   Net Book Value  Military...principles ( GAAP ). Given the number of worldwide existing assets without sufficient evidence to support acquisition cost, this is a daunting and costly

  11. Microgrid-Ready Solar PV - Planning for Resiliency

    Energy Technology Data Exchange (ETDEWEB)

    Booth, Samuel S [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-17

    This fact sheet provides background information on microgrids with suggested language for several up-front considerations that can be added to a solar project procurement or request for proposal (RFP) that will help ensure that PV systems are built for future microgrid connection.

  12. Rapid Airlift Planning for Amphibious-Ready Groups

    Science.gov (United States)

    2015-09-01

    to balance enhanced risk-mitigation versus reduced travel time. 8 Timlin and Pulleyblank (1992) develop a precedence-constrained traveling...that j can conduct flight operations in block 1 peni , j ,k penalty per unit of PMC-type k not moved from i to j tpenl ,h penalty for...j ,h l ∑ Xi, j ,l ,h (i, j ,h)|(i, j ,h)∈HARC ∑ + peni , j ,kEi, j ,k k ∑ (i, j )|(i, j )∈ARCS ∑ + costmlMi,l , j ,l ’,k ,h k ∑ (l ,l ’)|l<l ’ ∑ (i

  13. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  14. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  15. Fuel supply shutdown facility interim operational safety requirements

    International Nuclear Information System (INIS)

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance)

  16. 17 CFR 210.8-03 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Interim financial statements... AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES ACT OF 1933, SECURITIES EXCHANGE... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Article 8 Financial Statements of...

  17. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  18. 39 CFR 211.4 - Interim personnel regulations.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  19. Students' interim literacies as a dynamic resource for teaching and ...

    African Journals Online (AJOL)

    This article explores the notion of 'interim literacies'by drawing on data from a research project which used linguistic and intertextual analysis of first year student writing in economics to investigate the intersection of academic discourse and student voice. This research has provided a rich set of data to illustrate the ways in ...

  20. 46 CFR 308.303 - Amounts insured under interim binder.

    Science.gov (United States)

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  1. System Specification for Immobilized High-Level Waste Interim Storage

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository

  2. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  3. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  4. Public School Finance Problems in Texas. An Interim Report.

    Science.gov (United States)

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  5. Introducing Systematic Aging Management for Interim Storage Facilities in Germany

    International Nuclear Information System (INIS)

    Spieth-Achtnich, Angelika; Schmidt, Gerhard

    2014-01-01

    In Germany twelve at-reactor and three central (away from reactor) dry storage facilities are in operation, where the fuel is stored in combined transport-and-storage casks. The safety of the storage casks and facilities has been approved and is licensed for up to 40 years operating time. If the availability of a final disposal facility for the stored wastes (spent fuel and high-level wastes from reprocessing) will be further delayed the renewal of the licenses can become necessary in future. Since 2001 Germany had a regulatory guideline for at-reactor dry interim storage of spent fuel. In this guideline some elements of ageing were implemented, but no systematic approach was made for a state-of-the-art ageing management. Currently the guideline is updated to include all kind of storage facilities (central storages as well) and all kinds of high level waste (also waste from reprocessing). Draft versions of the update are under discussion. In these drafts a systematic ageing management is seen as an instrument to upgrade the available technical knowledge base for possible later regulatory decisions, should it be necessary to prolong storage periods to beyond the currently approved limits. It is further recognized as an instrument to prevent from possible and currently unrecognized ageing mechanisms. The generation of information on ageing can be an important basis for the necessary safety-relevant verifications for long term storage. For the first time, the demands for a systematic monitoring of ageing processes for all safety-related components of the storage system are described. In addition, for inaccessible container components such as the seal system, the neutron shielding, the baskets and the waste inventory, the development of a monitoring program is recommended. The working draft to the revised guideline also contains recommendations on non-technical ageing issues such as the long-term preservation of knowledge, long term personnel planning and long term

  6. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    International Nuclear Information System (INIS)

    1978-01-01

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunction with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein

  7. Characterization of void volume VOC concentration in vented TRU waste drums - an interim report

    International Nuclear Information System (INIS)

    Liekhus, K.J.

    1994-09-01

    A test program is underway at the Idaho National Engineering Laboratory to determine if the concentration of volatile organic compounds (VOCs) in the drum headspace is representative of the VOC concentration in the entire drum void space and to demonstrate that the VOC concentration in the void space of each layer of confinement can be estimated using a model incorporating diffusion and permeation transport principles and limited waste drum sampling data. An experimental test plan was developed requiring gas sampling of 66 transuranic (TRU) waste drums. This interim report summarizes the experimental measurements and model predictions of VOC concentration in the innermost layer of confinement from waste drums sampled and analyzed in FY 1994

  8. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  9. Fiscal 1976 Sunshine Project research report. Interim report (hydrogen energy); 1976 nendo chukan hokokushoshu. Suiso energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-11-01

    This report summarizes the Sunshine Project research interim reports on hydrogen energy of every organizations. The report includes research items, laboratories, institutes and enterprises concerned, research targets, research plans, and progress conditions. The research items are as follows. (1) Hydrogen production technology (electrolysis, high- temperature high-pressure water electrolysis, 4 kinds of thermochemical techniques, direct thermolysis). (2) Hydrogen transport and storage technology (2 kinds of solidification techniques). (3) Hydrogen use technology (combustion technology, fuel cell, solid electrolyte fuel cell, fuel cell power system, hydrogen fuel engine). (4) Hydrogen safety measures technology (disaster preventive technology for gaseous and liquid hydrogen, preventing materials from embrittlement due to hydrogen, hydrogen refining, transport and storage systems, their safety technology). (5) Hydrogen energy system (hydrogen energy system, hydrogen use subsystems, peripheral technologies). (NEDO)

  10. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  11. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunction with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.

  12. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 4

    International Nuclear Information System (INIS)

    Wuschke, D.M.; Gillespie, P.A.; Mehta, K.K.; Henrich, W.F.; LeNeveu, D.M.; Guvanasen, V.M.; Sherman, G.R.; Donahue, D.C.; Goodwin, B.W.; Andres, T.H.

    1985-12-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the isolation of corrosion-resistant containers of waste in a vault located deep in plutonic rock. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluation of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have on man and the environment if the concept were implemented. The second such assessment was performed in 1984 and is documented in the Second Interim Assessment of the Canadian Concept for Nuclear Fuel Waste Disposal - Volumes 1-4. This volume, entitled Post-Closure Assessment, describes the methods, models and data used to perform the second post-closure assessment. The results are presented and their significance is discussed. Conclusions and planned improvements are listed. 72 refs

  13. Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

    International Nuclear Information System (INIS)

    1995-04-01

    The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project

  14. Intrinsic bioremediation of landfills interim report

    Energy Technology Data Exchange (ETDEWEB)

    Brigmon, R.L. [Westinghouse Savannah River Company, Aiken, SC (United States); Fliermans, C.B.

    1997-07-14

    Intrinsic bioremediation is a risk management option that relies on natural biological and physical processes to contain the spread of contamination from a source. Evidence is presented in this report that intrinsic bioremediation is occurring at the Sanitary Landfill is fundamental to support incorportion into a Corrective Action Plan (CAP).

  15. Intrinsic bioremediation of landfills interim report

    International Nuclear Information System (INIS)

    Brigmon, R.L.; Fliermans, C.B.

    1997-01-01

    Intrinsic bioremediation is a risk management option that relies on natural biological and physical processes to contain the spread of contamination from a source. Evidence is presented in this report that intrinsic bioremediation is occurring at the Sanitary Landfill is fundamental to support incorportion into a Corrective Action Plan (CAP)

  16. ACR: Licensing and design readiness

    International Nuclear Information System (INIS)

    Alizadeh, A.

    2009-01-01

    Full text The Canadian nuclear technology has a long history dating back to the 1940s. In this regard, Canada is in a unique situation, shared only by a very few countries, where original nuclear power technology has been invented and further developed. Canadian Nuclear Safety Commission (CNSC), then called AECB, was established in 1946. CNSC focuses on nuclear security, nuclear safety, establishing health and safety regulations, and has also played an instrumental role in the formation of the IAEA. CNSC has provided assistance to the establishment of regulatory authorities in AECL's client countries such as Korea, Argentina, China and Romania. AECL has developed the Gen III+ ACR 1000 as evolutionary advancement of the current CANDU 6 reactor. ACR-1000 has evolved from AECL's in depth experience with CANDU systems, components, and materials, as well as the feedback received from owners and operators of CANDU plants. The ACR-1000 design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance. ACR-1000 has completed its Basic Engineering, has advanced in the licensing process in Canada, and is ready for deployment in Canadian and world markets. EC6 is an evolution of CANDU 6 and is a Gen III natural uranium fuelled reactor. Its medium size and potential for fuel localization and advanced fuel cycles is an optimal strategic solution in many markets.AECL's reactor products are shown to be compliant with a variety of licensing and regulatory requirements. These include the new CNSC DRD-337, IAEA NS-R1, and EUR. This allows the countries interested in CANDU reactor products to be confident of its licensing in their own regulatory regimes.

  17. ANALYSIS OF DOSE RATES DURING REPLACEMENT OF MANIPULATORS IN THE FFTF INTERIM EXAMINATION and MAINTENANCE (IEM) CELL

    International Nuclear Information System (INIS)

    NELSON, J.V.

    2002-01-01

    Replacement of a master-slave manipulator in the Interim Examination and Maintenance Cell at the Fast Flux Test Facility was carried out in August 2001. This operation created a 178-mm opening in the thick concrete wall of the hot cell. To aid in radiological work planning, dose rates outside the penetration in the wall were predicted using MCNP(trademark) photon transport calculations. The predicted dose rate was 7.7 mrem/h, which was reasonably close to the value of 10.4 mrem/h inferred from measurements

  18. Healthcare professionals' readiness for an interprofessional orthogeriatric unit: A cross-sectional survey

    DEFF Research Database (Denmark)

    Abrahamsen, Charlotte; Nørgaard, Birgitte; Draborg, Eva

    2016-01-01

    Professionals´ readiness for change is a precursor to successful implementation of organizational changes. An assessment of readiness for change can set the stage for the implementation by providing information regarding staff members’ beliefs and attitudes prior to an organizational change. We......-based questionnaire. Fully completed questionnaires were returned by 113 respondents (50.7%). Overall, 77.9% of the respondents indicated that they had either “excellent knowledge” or “some knowledge” of orthogeriatric care. Furthermore, 87.6% expressed their “full support” or “support” to the creation...... aspects; those voiced by the nursing staff related to work strain and the interests of their professional group whereas the physicians’ reservations concentrated on the planning of the change. The exploration of readiness for organizational change among health care professionals offers managers...

  19. Cost studies concerning decontamination and dismantling. The interim store for spent fuel at Studsvik

    International Nuclear Information System (INIS)

    Sjoeblom, Rolf; Sjoeoe, Cecilia; Lindskog, Staffan; Cato, Anna

    2006-04-01

    The interim store for spent fuel at Studsvik was designed and constructed in 1962-64. It has been used for wet storage of fuel from the Aagesta Nuclear Power Plant as well as the R2 reactor at Studsvik. The interim store comprises three cylindrical pools for fuel storage as well as equipment for handling and decontamination. The purpose of the present work is to develop methodology for calculation of future costs for decontamination and dismantling of nuclear research facilities. The analysis is based on information from Studsvik as well as results from information searches. The requirements on precision of cost calculations is high, also at early stages. The reason for this is that the funds are to be collected now but are to be used some time in the future. At the same time they should neither be insufficient nor superfluous. It is apparent from the compilation and analysis that when methodology that has been developed for the purpose of cost calculations for power reactors is applied to research facilities certain drawbacks become apparent, e.g. difficulties to carry out variation analyses. Generally, feedback of data on incurred costs for the purpose of cost calculations can be achieved by using one or more scaling factors together with weighing factors which are established based on e.g. expert judgement. For development and utilisation of such tools it is necessary to have access to estimated costs together with incurred ones. In the report, the following combination of aspects is identified as being of primary significance for achieving a high precision: Calculations with the possibility to calibrate against incurred costs; Radiological surveying tailored to the needs for calculations; Technical planning including selection of techniques to be used; Identification of potential sources for systematic deviations. In the case of the interim store, some of the sources of uncertainty are as follows: Damaged surface layers in the pools; Maintenance status for the

  20. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    suggest which basic features among the "possible futures" are playing out. Scenario planning provides for the implementation of appropriate constructed strategic responses. Scenarios allow for a pre-prepared game plan available for ready use as the future unfolds. They allow a deliberative response rather than a hastily constructed, urgent response. Copyright © 2011 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  1. Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts-An Interim Process Evaluation.

    Science.gov (United States)

    Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Dunford, Elizabeth K; Wu, Jason H Y; Neal, Bruce

    2017-10-17

    The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention ( n = 22) or control ( n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies ( p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government's Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods.

  2. Civilian Fitness: A Readiness Enabler

    Science.gov (United States)

    2008-03-24

    bonus to make working out convenient and facilitate work / life balance . This was secondary to the hope that a fitness program would produce healthier...workforce; and 3) become an employer of choice and promote work life balance .88 34 Strategic plans and supporting objectives of the Army Installation

  3. Beyond College Eligibility: A New Framework for Promoting College Readiness. College Readiness Indicator Systems Resource Series

    Science.gov (United States)

    Annenberg Institute for School Reform at Brown University, 2014

    2014-01-01

    The College Readiness Indicator Systems (CRIS) initiative was developed in response to a troubling pattern: More students than ever are enrolling in college after high school, but many of them are not college ready, as evidenced by persistently low rates of college completion. The sense of urgency to close the gap between college eligibility and…

  4. First Responder Readiness: A Systems Approach to Readiness Assessment Using Model Based Vulnerability Analysis Techniques

    Science.gov (United States)

    2005-09-01

    to come—if it be not to come, it will be now—if it be not now, yet it will come—the readiness is all. . .” --- Shakespeare , Hamlet , 5.2.215-219...BLANK 1 I. READINESS OVERVIEW A. INTRODUCTION “ Hamlet : . . . There is a special providence in the fall of a sparrow. If it be now ‘tis not

  5. Pathways to School Readiness: Executive Functioning Predicts Academic and Social-Emotional Aspects of School Readiness

    Science.gov (United States)

    Mann, Trisha D.; Hund, Alycia M.; Hesson-McInnis, Matthew S.; Roman, Zachary J.

    2017-01-01

    The current study specified the extent to which hot and cool aspects of executive functioning predicted academic and social-emotional indicators of school readiness. It was unique in focusing on positive aspects of social-emotional readiness, rather than problem behaviors. One hundred four 3-5-year-old children completed tasks measuring executive…

  6. Determining transition readiness in congenital heart disease: Assessing the utility of the Transition Readiness Questionnaire

    Science.gov (United States)

    The Transition Readiness Assessment Questionnaire (TRAQ) is a tool commonly used to assess transition readiness in adolescents with chronic diseases. It was previously validated in youth with special health care needs (YSHCN), but no patients with congenital heart disease (CHD) were included in the ...

  7. The significance of interfamilial relationships on birth preparedness and complication readiness in Pakistan.

    Science.gov (United States)

    Ghani, Usman; Crowther, Susan; Kamal, Yasir; Wahab, Muhammad

    2018-03-29

    In the interests of improving maternal health care and survival, the issue of birth preparedness and complication readiness has been much debated and has remained a priority for the international health community. The provision of birth preparedness and complications readiness is determined by a range of different factors. The main aim of this study is to identify and measure the influence of husbands and other family relationships on birth preparedness and complications readiness in the Khyber Pakhtunkhwa province of Pakistan. This study is a cross-sectional exploratory study. Data was collected through a survey questionnaire. Logistic regression and descriptive analysis was used. Analysis indicated that the mother-in-law's role, men's and women's level of education and interfamilial relationships are still the most significant factors influencing birth preparedness and complications readiness. Of the respondents, 86% were receiving antenatal care and 76.5% were planning for the birth to take place in state-run hospitals or private obstetric and gynae clinics. The tendency to take up antenatal care in Khyber Pakhtunkhwa can mainly be credited to a mutual understanding between husband and wife and a good relationship between the woman and her mother-in-law. Highlighting the significance of these relationships has implications for ensuring birth preparedness and complications readiness. Copyright © 2018 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  8. Interim report on nuclear power in Ontario

    International Nuclear Information System (INIS)

    1978-01-01

    An exhaustive report is presented on the implications of nuclear electric generation for Ontario's energy future. Such aspects as electrical demand and power planning, the CANDU fuel cycle, the nuclear debate, health, environmental and safety concerns, economics, social impacts and the status of the nuclear industry, uranium resources, ethical and political issues, nuclear weapons proliferation and plant security, and the regulation of nuclear power are dealt with in detail. (E.C.B.)

  9. Estate and business planning for the retiring physician.

    Science.gov (United States)

    Kingma, Kenneth W; Vaughn, Thomas D

    2012-01-01

    Retiring physicians have much to think about for estate planning purposes. The authors stand ready to help physicians sell or close their medical practice, navigate the 2010 Tax Act, take advantage of current planning opportunities, and prepare appropriate estate planning documents. Every estate is unique, so it is important to contact an estate planning advisor before taking any action.

  10. Quality improvement and accreditation readiness in state public health agencies.

    Science.gov (United States)

    Madamala, Kusuma; Sellers, Katie; Beitsch, Leslie M; Pearsol, Jim; Jarris, Paul

    2012-01-01

    There were 3 specific objectives of this study. The first objective was to examine the progress of state/territorial health assessment, health improvement planning, performance management, and quality improvement (QI) activities at state/territorial health agencies and compare findings to the 2007 findings when available. A second objective was to examine respondent interest and readiness for national voluntary accreditation. A final objective was to explore organizational factors (eg, leadership and capacity) that may influence QI or accreditation readiness. Cross-sectional study. State and Territorial Public Health Agencies. Survey respondents were organizational leaders at State and Territorial Public Health Agencies. Sixty-seven percent of respondents reported having a formal performance management process in place. Approximately 77% of respondents reported a QI process in place. Seventy-three percent of respondents agreed or strongly agreed that they would seek accreditation and 36% agreed or strongly agreed that they would seek accreditation in the first 2 years of the program. In terms of accreditation prerequisites, a strategic plan was most frequently developed, followed by a state/territorial health assessment and health improvement plan, respectively. Advancements in the practice and applied research of QI in state public health agencies are necessary steps for improving performance. In particular, strengthening the measurement of the QI construct is essential for meaningfully assessing current practice patterns and informing future programming and policy decisions. Continued QI training and technical assistance to agency staff and leadership is also critical. Accreditation may be the pivotal factor to strengthen both QI practice and research. Respondent interest in seeking accreditation may indicate the perceived value of accreditation to the agency.

  11. Solar Ready Vets Curriculum Design

    Energy Technology Data Exchange (ETDEWEB)

    Dalstrom, Tenley

    2017-08-31

    The 5-week SRV program includes four sets of program learning goals aligned around (1) the NABCEP Entry Level body of knowledge; (2) gaining hands-on experience with solar system site analysis, design, installation, commissioning, operation, maintenance and financial considerations; (3) Safety issues unique to solar + OSHA 30; (4) Transition planning and individual support of entry into the solar industry. These goals, and the learning objectives associate with each, are pursued in parallel during the course.

  12. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    International Nuclear Information System (INIS)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  13. Interim Storage of Plutonium in Existing Facilities

    International Nuclear Information System (INIS)

    Woodsmall, T.D.

    1999-01-01

    reactor building. The storage life is projected to be ten years to allow the preparation of APSF. DOE has stipulated that there be no credible release during storage, since there are no design features in place to mitigate a release of plutonium (i.e. HEPA filters, facility containment boundaries, etc.). This mandate has presented most of the significant challenges to the safety analysis team. The shipping packages are designed to withstand certain accidents and conditions, but in order to take credit for these the storage environment must be strictly controlled. Damages to the packages from exposure to fire, dropping, crushing and other impact accidents have been analyzed, and appropriate preventative design features have been incorporated. Other efforts include the extension of the shipping life (roughly two years) to a suitable storage life of ten years. These issues include the effects of internal pressure increases, seal degradation and the presence of impurities. A process known as the Container Qualification Program has been conducted to address these issues. The KAMS project will be ready to receive the first shipment from Rocky Flats in January 2000. No credible design basis scenarios resulting in the release of plutonium exist. This work has been useful in the effort to provide a safer disposition of plutonium, but also the lessons learned and techniques established by the team will help with the analysis of future facility modifications.'

  14. Ready for kindergarten: Are intelligence skills enough?

    Directory of Open Access Journals (Sweden)

    Caroline Fitzpatrick

    2017-12-01

    Full Text Available This study investigated how different profiles of kindergarten readiness in terms of student intellectual ability, academic skills and classroom engagement relate to future academic performance. Participants are French-Canadian children followed in the context of the Quebec Longitudinal Study of Child Development (N = 670. Trained examiners measured number knowledge, receptive vocabulary and fluid intelligence when children were in kindergarten. Teachers rated kindergarten classroom engagement. Outcomes included fourth-grade teacherrated achievement and directly assessed mathematical skills. Latent class analyses revealed three kindergarten readiness profiles: high (57%, moderate (34% and low (9.3% readiness. Using multiple regression, we found that a more favourable kindergarten profile predicted better fourth-grade academic performance. Identifying children at risk of academic difficulty is an important step for preventing underachievement and dropout. These results suggest the importance of promoting a variety of cognitive, academic and behavioural skills to enhance later achievement in at-risk learners.

  15. Readiness evaluation report -- High-exposure rate hardware removal resumption of activities

    International Nuclear Information System (INIS)

    Volkman, C.L.

    1996-11-01

    In August 1996, N Basin Project Management proactively ceased activities in the N Basin after noting several radiological control anomalies occurring during the performance of the high exposure rate hardware removal activity. The HERH is one of several activities that will be accomplished to complete deactivation of N Basin. Three project critiques were performed to identify causes and several corrective actions were identified. To ensure the true causes of the events were identified the N Basin Project Manager requested that a root cause analysis be performed for the events covered by the three critiques. The intent was to identify recurring events and evaluate the effectiveness of corrective action implementation. These three review elements were used by the project to develop a corrective action plan (CAP) which consisted of both project unique and programmatic items. The N Basin Project is using this BHI Readiness Evaluation (RE) process as a mechanism to independently verify that corrective actions identified from the CAP have been completed and that no changes have been made during the stand down that affect the resumption of the HERH activities. A readiness evaluation (RE) plan (Attachment 3) was prepared. The completed Readiness Evaluation Records which documents the results of the team member evaluations are in attachment 1. The independent readiness evaluation team identified 5 deficiencies of which two are post startup and three are pre startup. All deficiencies are in the area of training. These findings are explained in detail in Attachment 2

  16. Operational Readiness Review Final Report For F-Canyon Restart. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    McFarlane, A.F.; Spangler, J.B.

    1995-04-05

    An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH& QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment.

  17. Operational Readiness Review Final Report For F-Canyon Restart. Phase 1

    International Nuclear Information System (INIS)

    McFarlane, A.F.; Spangler, J.B.

    1995-01-01

    An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH ampersand QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment

  18. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  19. Organizational readiness in specialty mental health care.

    Science.gov (United States)

    Hamilton, Alison B; Cohen, Amy N; Young, Alexander S

    2010-01-01

    Implementing quality improvement efforts in clinics is challenging. Assessment of organizational "readiness" for change can set the stage for implementation by providing information regarding existing strengths and deficiencies, thereby increasing the chance of a successful improvement effort. This paper discusses organizational assessment in specialty mental health, in preparation for improving care for individuals with schizophrenia. To assess organizational readiness for change in specialty mental health in order to facilitate locally tailored implementation strategies. EQUIP-2 is a site-level controlled trial at nine VA medical centers (four intervention, five control). Providers at all sites completed an organizational readiness for change (ORC) measure, and key stakeholders at the intervention sites completed a semi-structured interview at baseline. At the four intervention sites, 16 administrators and 43 clinical staff completed the ORC, and 38 key stakeholders were interviewed. The readiness domains of training needs, communication, and change were the domains with lower mean scores (i.e., potential deficiencies) ranging from a low of 23.8 to a high of 36.2 on a scale of 10-50, while staff attributes of growth and adaptability had higher mean scores (i.e., potential strengths) ranging from a low of 35.4 to a high of 41.1. Semi-structured interviews revealed that staff perceptions and experiences of change and decision-making are affected by larger structural factors such as change mandates from VA headquarters. Motivation for change, organizational climate, staff perceptions and beliefs, and prior experience with change efforts contribute to readiness for change in specialty mental health. Sites with less readiness for change may require more flexibility in the implementation of a quality improvement intervention. We suggest that uptake of evidence-based practices can be enhanced by tailoring implementation efforts to the strengths and deficiencies of the

  20. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.