  1. Readiness Review Plan for the Interim Remedial Action on Surface Debris in Waste Area Grouping 11 at Oak Ridge National Laboratory, Oak Ridge, TN

    International Nuclear Information System (INIS)

    1993-10-01

    This Readiness Review Plan was prepared by the Waste Area Grouping (WAG) 11 Site Project Readiness Review Team as an overview of the Interim Remedial Action on Surface Debris in WAG 11 project at Oak Ridge National Laboratory, including major readiness milestones, criteria development methodology, and a list of events to occur as part of the review process for determining readiness for each project phase

  2. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  3. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  4. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  5. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  6. Electricity market readiness plan : Ontario Energy Board

    International Nuclear Information System (INIS)

    2001-03-01

    This document informs electric power market participants of the Ontario Energy Board's newly developed market readiness plan and target timelines that local distribution companies (LDCs) must meet for retail marketing. The Ontario Energy Board's plan incorporates relevant independent market operator (IMO)-administered market milestones with retail market readiness targeted for September 2001. The market readiness framework involves a self-certification process for LDCs by August 10, 2001, through which the Board will be able to monitor progress and assess the feasibility of meeting the target timelines. For retail market readiness, all LDCs will have to calculate settlement costs, produce unbundled bills, provide standard supply service, change suppliers and accommodate retail transactions. LDCs must be either authorized participants in the IMO-administered market or become retail customers of their host LDC. Unbundled bills will include itemized charges for energy price, transmission, distribution and debt retirement charge. 1 tab., 1 fig

  7. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  8. Single Shell Tank (SST) Interim Stabilization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  9. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  10. Readiness to proceed: Characterization planning basis

    International Nuclear Information System (INIS)

    Adams, M.R.

    1998-01-01

    This report summarizes characterization requirements, data availability, and data acquisition plans in support of the Phase 1 Waste Feed Readiness to Proceed Mid-Level Logic. It summarizes characterization requirements for the following program planning documents: Waste Feed Readiness Mid-Level Logic and Decomposition (in development); Master blue print (not available); Tank Waste Remediation System (TWRS) Operations and Utilization Plan and Privatization Contract; Enabling assumptions (not available); Privatization low-activity waste (LAW) Data Quality Objective (DQO); Privatization high-level waste (HLW) DQO (draft); Problem-specific DQOs (in development); Interface control documents (draft). Section 2.0 defines the primary objectives for this report, Section 3.0 discusses the scope and assumptions, and Section 4.0 identifies general characterization needs and analyte-specific characterization needs or potential needs included in program documents and charts. Section 4.0 also shows the analyses that have been conducted, and the archive samples that are available for additional analyses. Section 5.0 discusses current plans for obtaining additional samples and analyses to meet readiness-to-proceed requirements. Section 6.0 summarizes sampling needs based on preliminary requirements and discusses other potential characterization needs. Many requirements documents are preliminary. In many cases, problem-specific DQOs have not been drafted, and only general assumptions about the document contents could be obtained from the authors. As a result, the readiness-to-proceed characterization requirements provided in this document are evolving and may change

  11. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  12. Permitting plan for the high-level waste interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1997-04-23

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

  13. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  14. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  15. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  16. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  17. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Carl J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  18. T Tank Farm Interim Cover Test - Design Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.

    2006-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  19. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  20. NIITEK-NVESD AMDS program and interim field-ready system

    Science.gov (United States)

    Hibbard, Mark W.; Etebari, Ali

    2010-04-01

    NIITEK (Non-Intrusive Inspection Technology, Inc) develops and fields vehicle-mounted mine and buried threat detection systems. Since 2003, the NIITEK has developed and tested a remote robot-mounted mine detection system for use in the NVESD AMDS program. This paper will discuss the road map of development since the outset of the program, including transition from a data collection platform towards a militarized field-ready system for immediate use as a remote countermine and buried threat detection solution with real-time autonomous threat classification. The detection system payload has been integrated on both the iRobot Packbot and the Foster-Miller Talon robot. This brief will discuss the requirements for a successful near-term system, the progressive development of the system, our current real-time capabilities, and our planned upgrades for moving into and supporting field testing, evaluation, and ongoing operation.

  1. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  2. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  3. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  4. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  5. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  6. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  7. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  8. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  9. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  10. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  11. Proposed plan for interim remedial measure at the 100-KR-4 operable unit, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for an interim remedial action plan for the 100-KR-4 Operable Unit at the Hanford Site. The alternative presented is to remove contaminated groundwater from the Unit, treat it by ion exchange, and then dispose of treated groundwater by using upgradient injection wells to return it to the acquifer. This will protect the Columbia River environment from toxic hexavalent chromium. This alternative is the initial recommendation of the EPA, Ecology, and the DOE. Public comment on this plan is invited

  12. Operations and Maintenance Concept Plan for the Immobilized High-Level Waste (IHLW) Interim Storage Facility

    International Nuclear Information System (INIS)

    JANIN, L.F.

    2000-01-01

    This OandM Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design

  13. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  14. Enterprise resource planning: An assessment for readiness to change

    Directory of Open Access Journals (Sweden)

    Ali Ashraf Nazari

    2014-01-01

    Full Text Available This paper presents an empirical investigation for the implementation of enterprise resource planning among 58 production units in province of Ilam, Iran. The proposed study of this paper considers the readiness in terms of six factors including human resources, financial resources, infrastructures, quality control, and information systems and communication technology. Using structural equation modeling, the study examines six hypotheses and the implementation is accomplished on LISREL software package. Cronbach alpha has been calculated as 0.91, which is well above the minimum desirable level. The results of the survey have indicated that all six mentioned factors influence positively on ERP implementation and for a successful implementation of ERP, it is suggested to consider these factors, seriously.

  15. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830

  16. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  18. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    Science.gov (United States)

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  19. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  20. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  1. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-07-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter

  2. 1998 242-A interim evaporator tank system integrity assessment plan

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology's Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem

  3. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  4. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    Science.gov (United States)

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  5. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  6. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  7. 40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

    International Nuclear Information System (INIS)

    Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

    1989-03-01

    This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs

  8. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  9. Readiness evaluation plan for operation of the 200-ZP-1 Pump-and-Treat system. Revision 1

    International Nuclear Information System (INIS)

    Lehrschall, R.R.

    1996-07-01

    This Project Readiness Evaluation will show that the 200-ZP-1 Interim Remedial Measure (IRM) remedial activity is prepared to safely and effectively commence work activities. The purpose of the IRM is to reduce further migration of the carbon tetrachloride chloroform, and trichorlorethylene in the groundwater of the 200 West Area at the Hanford Site in Richland, Washington

  10. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  11. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-04-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  12. 78 FR 14635 - HACCP Plan Reassessment for Not-Ready-To-Eat Comminuted Poultry Products and Related Agency...

    Science.gov (United States)

    2013-03-07

    ... Plan Reassessment for Not-Ready-To-Eat Comminuted Poultry Products and Related Agency Verification..., 2012, Federal Register document ``HACCP Plan Reassessment for Not-Ready-to-Eat Comminuted Poultry... additional 45 days for establishments that produce not-ready-to-eat (NRTE) comminuted chicken or turkey...

  13. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  14. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  15. T-TY Tank Farm Interim Surface Barrier Demonstration—Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-09-27

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy’s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  16. T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z.F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy's Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  17. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  18. Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P Evan

    2004-10-25

    This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

  19. Interim Action Proposed Plan for the old radioactive waste burial ground (643-E)

    International Nuclear Information System (INIS)

    McFalls, S.

    1995-12-01

    This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this IAPP is to describe the preferred interim remedial action for addressing the Old Radioactive Waste Burial Ground (ORWBG) unit located in the Burial Ground Complex (BGC) at the Savannah River Site (SRS) in Aiken, South Carolina. On December 21, 1989, SRS was included on the National Priorities List (NPL). In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), DOE has negotiated a Federal Facility Agreement (FFA, 1993) with EPA and SCDHEC to coordinate remedial activities at SRS. Public participation requirements are listed in Sections 113 and 117 of CERCLA. These requirements include establishment of an Administrative Record File that documents the selection of remedial alternatives and allows for review and comment by the public regarding those alternatives. The SRS Public Involvement Plan (PIP) (DOE, 1994) is designed to facilitate public involvement in the decision-making process for permitting closure, and the selection of remedial alternatives. Section 117(a) of CERCLA, 1980, as amended, requires publication of a notice of any proposed remedial action

  20. Readiness factors for information system strategic planning among universities in developing countries: a systematic review

    Science.gov (United States)

    Irfan, M.; Putra, S. J.; Alam, C. N.; Subiyakto, A.; Wahana, A.

    2018-03-01

    The implementation of information system strategic planning (ISSP) in higher education institutions is to improve work efficiency, management effectiveness in order to improve organizational competitive advantage. However, the question of whether all universities are ready to implement ISSP as a way to achieve organizational goals has not been answered. This study aims to investigate the readiness phenomena through literature study. The method used is by using the Systematic Literature Review (SLR) instrument to identify readiness factors on the implementation of ISSP, especially among the institutions of higher education in developing countries. This study has identified 10 readiness measurement. There are three categories of measurement, namely people, processes and technologies that represent 11 factors of ISSP readiness measurement in universities.

  1. Sampling and analysis plan for Wayne Interim Storage Site (WISS), Wayne, New Jersey

    International Nuclear Information System (INIS)

    Brown, K.S.; Murray, M.E.; Rodriguez, R.E.

    1998-10-01

    This field sampling plan describes the methodology to perform an independent radiological verification survey and chemical characterization of a remediated area of the subpile at the Wayne Interim Storage Site, Wayne, New Jersey.Data obtained from collection and analysis of systematic and biased soil samples will be used to assess the status of remediation at the site and verify the final radiological status. The objective of this plan is to describe the methods for obtaining sufficient and valid measurements and analytical data to supplement and verify a radiological profile already established by the Project Remediation Management Contractor (PMC). The plan describes the procedure for obtaining sufficient and valid analytical data on soil samples following remediation of the first layer of the subpile. Samples will be taken from an area of the subpile measuring approximately 30 m by 80 m from which soil has been excavated to a depth of approximately 20 feet to confirm that the soil beneath the excavated area does not exceed radiological guidelines established for the site or chemical regulatory limits for inorganic metals. After the WISS has been fully remediated, the Department of Energy will release it for industrial/commercial land use in accordance with the Record of Decision. This plan provides supplemental instructions to guidelines and procedures established for sampling and analysis activities. Procedures will be referenced throughout this plan as applicable, and are available for review if necessary

  2. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  3. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  4. Future Ready Learning: Reimagining the Role of Technology in Education. 2016 National Education Technology Plan

    Science.gov (United States)

    Thomas, Susan

    2016-01-01

    The National Education Technology Plan is the flagship educational technology policy document for the United States. The 2016 Plan, "Future Ready Learning: Reimagining the Role of Technology in Education," articulates a vision of equity, active use, and collaborative leadership to make everywhere, all-the-time learning possible. While…

  5. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  6. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants. Interim report

    International Nuclear Information System (INIS)

    1980-01-01

    The purpose of this document is to provide a common reference and interim guidance source for: state and local governments and nuclear facility operators in the development of radiological emergency response plans and preparedness in support of nuclear power plants; and Nuclear Regulatory Commission (NRC), Federal Emergency Management Agency (FEMA) and other Federal agency personnel engaged in the review of state, local government, and licensee plans and preparedness

  7. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  8. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  9. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  10. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    1991-01-01

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  11. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  12. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  13. Readiness assessment plan for the Radioactive Mixed Waste Land Disposal Facility (Trench 31)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    This document provides the Readiness Assessment Plan (RAP) for the Project W-025 (Radioactive Mixed Waste Land Disposal Facility) Readiness Assessment (RA). The RAP documents prerequisites to be met by the operating organization prior to the RA. The RAP is to be implemented by the RA Team identified in the RAP. The RA Team is to verify the facility's compliance with criteria identified in the RAP. The criteria are based upon the open-quotes Core Requirementsclose quotes listed in DOE Order 5480.31, open-quotes Startup and Restart of Nuclear Facilitiesclose quotes

  14. Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan

    International Nuclear Information System (INIS)

    PRIGNANO, A.L.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure

  15. Readiness review plan for the in situ vitrification demonstration of Seepage Pit 1 in Waste Area Grouping 7

    International Nuclear Information System (INIS)

    1995-05-01

    A treatability study is planned that encompasses the application of in situ vitrification (ISV) to at least two segments of the Oak Ridge National Laboratory Seepage Pit I during the third quarter of fiscal year 1995. Before the treatability study can be initiated, the proposed activity must be subjected to an Operational Readiness Review (ORR). ORR is a structured methodology of determining readiness to proceed as outlined in Martin Marietta Energy Systems, Inc. (Energy Systems), Environmental Restoration Waste Management Procedure ER/C-P1610, which provides Energy Systems organizations assurance that the work to be performed is consistent with management's expectations and that the subject activity is ready to proceed safely. The readiness review plan provides details of the review plan overview and the scope of work to be performed. The plan also identifies individuals and position responsibilities for implementing the activity. The management appointed Readiness Review Board (RRB) has been identified. A Field Readiness Review Team (FRT), a management appointed multidisciplinary group, has been established (1) to evaluate the ISV treatability study, (2) to identify and assemble supporting objective evidences of the readiness to proceed, and (3) to assist the team leader in presenting the evidences to the RRB. A major component of RRB is the formulation of readiness review criteria months before the operation. A comprehensive readiness review tree (a positive logic tree) is included, which identifies the activities required for the development of the readiness criteria. The readiness review tree serves as a tool to prevent the omission of an item that could affect system performance. All deficiencies identified in the review will be determined as prestart findings and must be resolved before the project is permitted to proceed. The final approval of the readiness to proceed will be the decision of RRB

  16. Preparation of waste analysis plans under the Resource Conservation and Recovery Act (Interim guidance)

    International Nuclear Information System (INIS)

    1993-03-01

    This document is organized to coincide with the suggested structure of the actual Waste Analysis Plans (WAP) discussed in the previous section. The contents of the remaining eleven chapters and appendices that comprise this document are described below: Chapter 2 addresses waste streams, test parameters, and rationale for sampling and analytical method selection; test methods for analyzing parameters; proceduresfor collecting representative samples; and frequency of sample collection and analyses. These are the core WAP requirements. Chapter 3 addresses analysis requirements for waste received from off site. Chapter 4addresses additional requirements for ignitable, reactive, or incompatible wastes. Chapter 5 addresses unit-specific requirements. Chapter 6 addresses special procedures for radioactive mixed waste. Chapter 7 addresses wastes subject to the land disposal restrictions. Chapter 8 addresses QA/QC procedures. Chapter 9 compares the waste analysis requirements of an interim status facility with those of a permitted facility. Chapter 10 describes the petition process required for sampling and analytical procedures to deviate from accepted methods, such as those identified in promulgated regulations. Chapter 11 reviews the process for modification of WAPs as waste type or handling practices change at a RCRA permitted TSDF. Chapter 12 is the list of references that were used in the preparation of this guidance. Appendix A is a sample WAP addressing physical/chemical treatment and container storage. Appendix B is a sample WAP addressing an incinerator and tank systems. Appendix C discusses the relationship of the WAP to other permitting requirements and includes specific examples of how waste analysis is used to comply with certain parts of a RCRA permit. Appendix D contains the exact wording for the notification/certification requirements under theland disposal restrictions

  17. Readiness plan, Hanford 300 Area Treated Effluent Disposal Facility: Revision 1

    International Nuclear Information System (INIS)

    Storm, S.J.

    1994-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is designed for the collection, treatment, and eventual disposal of liquid waste from the 300 Area Process Sewer (PS) system. The PS currently discharges water to the 300 Area Process Trenches. Facilities supported total 54 buildings, including site laboratories, inactive buildings, and support facilities. Effluent discharges to the process sewer from within these facilities include heating, ventilation, and air conditioning systems, heat exchangers, floor drains, sinks, and process equipment. The wastewaters go through treatment processes that include iron coprecipitation, ion exchange and ultraviolet oxidation. The iron coprecipitation process is designed to remove general heavy metals. A series of gravity filters then complete the clarification process by removing suspended solids. Following the iron coprecipitation process is the ion exchange process, where a specific resin is utilized for the removal of mercury. The final main unit operation is the ultraviolet destruction process, which uses high power ultraviolet light and hydrogen peroxide to destroy organic molecules. The objective of this readiness plan is to provide the method by which line management will prepare for a Readiness Assessment (RA) of the TEDF. The self-assessment and RA will assess safety, health, environmental compliance and management readiness of the TEDF. This assessment will provide assurances to both WHC and DOE that the facility is ready to start-up and begin operation

  18. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ... facilities listed above that are necessary to generate hydroelectric power and to maintain these facilities... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831...

  19. Readiness to participate in advance care planning: A qualitative study of renal failure patients, families and healthcare providers.

    Science.gov (United States)

    Hutchison, Lauren A; Raffin-Bouchal, Donna S; Syme, Charlotte A; Biondo, Patricia D; Simon, Jessica E

    2017-09-01

    Objectives Advance care planning is the process by which people reflect upon their wishes and values for healthcare, discuss their choices with family and friends and document their wishes. Readiness represents a key predictor of advance care planning participation; however, the evidence for addressing readiness is scarce within the renal failure context. Our objectives were to assess readiness for advance care planning and barriers and facilitators to advance care planning uptake in a renal context. Methods Twenty-five participants (nine patients, nine clinicians and seven family members) were recruited from the Southern Alberta Renal Program. Semi-structured interviews were recorded, transcribed and then analyzed using interpretive description. Results Readiness for advance care planning was driven by individual values perceived by a collaborative encounter between clinicians and patients/families. If advance care planning is not valued, then patients/families and clinicians are not ready to initiate the process. Patients and clinicians are delaying conversations until "illness burden necessitates," so there is little "advance" care planning, only care planning in-the-moment closer to the end of life. Discussion The value of advance care planning in collaboration with clinicians, patients and their surrogates needs reframing as an ongoing process early in the patient's illness trajectory, distinguished from end-of-life decision making.

  20. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  1. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  2. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  3. Ready, set, stop: mismatch between self-care beliefs, transition readiness skills, and transition planning among adolescents, young adults, and parents.

    Science.gov (United States)

    Sawicki, Gregory S; Kelemen, Skyler; Weitzman, Elissa R

    2014-10-01

    Health care transition (HCT) from pediatric to adult-focused systems is a key milestone for youth. Developing self-care skills and HCT planning are key elements. In a survey at 4 pediatric specialty clinics to 79 youth aged 16 to 25 years and 52 parents, skill-based HCT readiness was assessed using the Transition Readiness Assessment Questionnaire (TRAQ). Multivariable logistic regression evaluated the association between TRAQ scores and self-care beliefs. In all, 70% of youth and 67% of parents believed that they/their child could manage their care. Only 38% of youth and 53% of parents reported thinking about HCT; only 18% of youth and 27% of parents reported having a HCT plan. Youth with higher TRAQ scores were more likely to believe they could manage their care, controlling for age and gender (adjusted odds ratio = 4.0, 95% confidence interval = 1.7-9.5). Transition readiness skills are associated with self-care beliefs. However, a mismatch exists between high reported self-care beliefs and low levels of transition planning. © The Author(s) 2014.

  4. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  5. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  6. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  7. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  8. Interim status of closure/post-closure plan for 183-H solar evaporation basins

    International Nuclear Information System (INIS)

    1988-03-01

    This report describes a plan for decommissioning several solar evaporation basins on the Hanford reservation. The document describes procedures for sampling during decommissioning and a plan for certification of the resulting completed landfill. Additional plans deal with the training, security of the site, and post-closure monitoring

  9. DOE Zero Energy Ready Home Case Study: New Town Builders — The ArtiZEN Plan, Denver, CO

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    The Grand Winner in the Production Builder category of the 2014 Housing Innovation Awards, this builder plans to convert all of its product lines to DOE Zero Energy Ready Home construction by the end of 2015. This home achieves HERS 38 without photovoltaics (PV) and HERS -3 with 8.0 kW of PV.

  10. Proposed plan for interim remedial measure at the 100-HR-3 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measure for addressing groundwater contamination at the 100-HR-3 Operable Unit, located at the Hanford Site, along the Columbia River. In addition, this plan includes a summary of other alternatives analyzed for the 100-HR-3 Operable Unit. The 100 Areas of the Hanford Site were placed on the Superfund National Priorities List (NPL) on November 3, 1989, because of soil and groundwater contamination resulting from the past operation of nuclear facilities. The preferred alternative described here is Institutional Control/Continued Current Actions. This alternative includes continued operation and evaluation of the Pilot-Scale Treatability Study located in the 100 D/DR Area, further evaluation of ecological risks through the Columbia River Comprehensive Impact Assessment, continued application of institutional controls and groundwater monitoring. Three areas make up the 100-HR-3 Operable Unit: 100 H Reactor area; 100 D/DR Reactor area; and the area between the H and D/DR reactors. Chromium is the main contaminant of concern in the groundwater below this area and is thought to be causing adverse impacts to the Columbia River and surrounding habitat

  11. National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.

    Science.gov (United States)

    Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.

    This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…

  12. How countries link REDD+ interventions to drivers in their readiness plans: implications for monitoring systems

    International Nuclear Information System (INIS)

    Salvini, G; Herold, M; De Sy, V; Kissinger, G; Brockhaus, M; Skutsch, M

    2014-01-01

    Countries participating in the REDD+ scheme are in the readiness phase, designing policy interventions to address drivers of deforestation and forest degradation (DD). In order for REDD+ interventions to be effective, it is essential that they take into account the specific drivers that they aim to address. Moreover it is crucial to design systems that monitor the effectiveness of the planned interventions. In this article we provide a comprehensive and comparative assessment of interventions proposed by 43 REDD+ countries in 98 readiness documents. We summarize the types of interventions and assess if they are formulated referring to the drivers of DD that they are aiming to address. Based on this assessment we consider the implications for systems for monitoring effectiveness of proposed interventions. Most countries reviewed link proposed interventions to specific drivers of DD. The majority of the countries making this link have better driver data quality, in particularly those that present their data in ratio or ordinal terms. Proposed interventions focus not only on activities to reduce deforestation, but also on other forest related REDD+ activities such as sustainable forest management, which reduce forest degradation and enhance forest stocks. Moreover, driver-specific interventions often relate to drivers not only inside but also outside the forest sector. Hence we suggest that monitoring systems need to assess not only deforestation rates through remote sensing, but also degradation and other carbon stock changes within the forest, using more detailed ground level surveys and measurements. In addition, the performance of interventions outside the forest need to be monitored, even if the impacts of these cannot be linked to specific changes in forest carbon stock in specific locations. (paper)

  13. Can Scores on an Interim High School Reading Assessment Accurately Predict Low Performance on College Readiness Exams? REL 2016-124

    Science.gov (United States)

    Koon, Sharon; Petscher, Yaacov

    2016-01-01

    During the 2013/14 school year two Florida school districts sought to develop an early warning system to identify students at risk of low performance on college readiness measures in grade 11 or 12 (such as the SAT or ACT) in order to support them with remedial coursework prior to high school graduation. The study presented in this report provides…

  14. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  15. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  16. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  17. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  18. 77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees

    Science.gov (United States)

    2012-10-15

    ... of good repair, livability, and environmental sustainability. State Freight Plans can also identify... analysis would show what the strengths of the State's freight system are that the State wishes to build.../freight/freight_analysis/data_sources/index.htm Freight Analysis Framework: http://www.ops.fhwa.dot.gov...

  19. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  20. Interim remedial action work plan for the cesium plots at Waste Area Grouping 13 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-07-01

    This remedial action work plan (RAWP) is issued under the Federal Facility Agreement to provide a basic approach for implementing the interim remedial action (IRA) described in Interim Record of Decision for the Oak Ridge National Laboratory Waste Area Grouping 13 Cesium Plots, Oak Ridge, Tennessee. This RAWP summarizes the interim record of decision (IROD) requirements and establishes the strategy for the implementation of the field activities. As documented in the IROD document, the primary goal of this action is to reduce the risk to human health and the environment resulting from current elevated levels of gamma radiation on the site and at areas accessible to the public adjacent to the site. The major steps of this IRA are to: Excavate cesium-contaminated soil; place the excavated soils in containers and transport to Waste Area Grouping (WAG) 6; and backfill excavated plots with clean fill materials. The actual remedial action will be performed by Department of Energy prime contractor, MK-Ferguson of Oak Ridge Company. Remediation of the cesium plots will require approximately 60 days to complete. During this time, all activities will be performed according to this RAWP and the applicable specifications, plans, and procedures referred to in this document. The IRA on WAG 13 will prevent a known source of cesium-contaminated soil from producing elevated levels of gamma radiation in areas accessible to the public, eliminate sources of contamination to the environment, and reduce the risks associated with surveillance and maintenance of the WAG 13 site

  1. Human Research Program Integrated Research Plan: December 20, 2007, Interim Baseline

    Science.gov (United States)

    2008-01-01

    The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration. This Integrated Research Plan (IRP) describes the program s research activities that are intended to address the needs of human space exploration and serve HRP customers. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration. The document serves several purposes for the Human Research Program: The IRP provides a means to assure that the most significant risks to human space explorers are being adequately mitigated and/or addressed, The IRP shows the relationship of research activities to expected outcomes and need dates, The IRP shows the interrelationships among research activities that may interact to produce products that are integrative or cross defined research disciplines, The IRP illustrates the non-deterministic nature of research and technology activities by showing expected decision points and potential follow-on activities, The IRP shows the assignments of responsibility within the program organization and, as practical, the intended solicitation approach, The IRP shows the intended use of research platforms such as the International Space Station, NASA Space Radiation Laboratory, and various space flight analogs. The IRP does not show all budgeted activities of the Human research program, as some of these are enabling functions, such as management, facilities and infrastructure

  2. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, South Walnut Creek Basin, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1991-01-01

    Volume 2 of this IM/IRA Plan contains OU 2 surface water, sediment, ground water and soil chemistry data, as well as the South Walnut Creek Basin Surface Water IM/IRA schedule and a tabulation of ARARs. (FL)

  3. An Investigation of Mobile Learning Readiness in Higher Education Based on the Theory of Planned Behavior

    Science.gov (United States)

    Cheon, Jongpil; Lee, Sangno; Crooks, Steven M.; Song, Jaeki

    2012-01-01

    This study investigated the current state of college students' perceptions toward mobile learning in higher education. Mobile learning is a new form of learning utilizing the unique capabilities of mobile devices. Although mobile devices are ubiquitous on college campuses, student readiness for mobile learning has yet to be fully explored in the…

  4. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  5. Interim guidance on the Standard Review Plan for the review of financial assurance mechanisms for decommissioning under 10 CFR Parts 30, 40, and 70

    International Nuclear Information System (INIS)

    1988-12-01

    Interim Guidance on the Standard Review Plan (SRP) for the Review of Financial Assurance Mechanisms for Decommissioning under 10 CFR Parts 30, 40, and 70 is prepared for the guidance of Nuclear Regulatory Commission staff reviewers in performing reviews of applications from material licensees affected by the decommissioning regulations established June 27, 1988 (53FR24018). The principal purpose of the SRP is to assure the quality and uniformity of staff reviews and to present a base from which to evaluate the financial assurance aspects of the applications. NUREG-1337, identifies who performs the review, the matters that are reviewed, the basis of the review, how the review is performed, and the conclusions that are sought. 3 refs

  6. DOE Zero Energy Ready Home Case Study: Thrive Home Builders, Lowry Plan

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2017-09-01

    Thrive Home Builders built this 4,119-ft2 home at the Lowry development in Denver, Colorado, to the high-performance criteria of the U.S. Department of Energy’s Zero Energy Ready Home Program. Despite the dense positioning of the homes, mono-plane roof designs afforded plenty of space for the 8.68 kW of photovoltaic panels. With the PV, the home achieves a Home Energy Rating System (HERS) score of 4 and the home owners should enjoy energy bills of about $-11 a year. Without the PV, the home would score a HERS 38 (far lower than the HERS 80 to 100 of typical new homes).

  7. Personal strategic plan development: getting ready for changes in our professional and personal lives.

    Science.gov (United States)

    Hinojosa, Jim

    2012-01-01

    Daily challenges for occupational therapists and occupational therapy assistants are changing work environments and the desire to address the needs of their clients. This article highlights the need for occupational therapy practitioners to create personal strategic plans to prepare for their rapidly changing futures. Although AOTA's Centennial Vision responds to the profession's future, practitioners must focus on their personal and professional roles and responsibilities. They also must engage in individual strategic planning. Sound individual strategic planning provides a means for practitioners to merge their fantasized views of occupational therapy with the reality of today's practice. Copyright © 2012 by the American Occupational Therapy Association, Inc.

  8. The Art of Capacity Planning Being Ready for the Big Growth Spurt

    CERN Document Server

    Allspaw, John

    2009-01-01

    Web-based companies live or die by the ability to scale their infrastructure to accommodate increasing demand. This book is a hands-on and practical guide to planning for such growth, with many techniques and considerations to help you plan, deploy, and manage web application infrastructure. Written by the manager of data operations for the world-famous photo-sharing site Flickr.com, the author offers advice based on years of valuable experience.

  9. Determinants of facility readiness for integration of family planning with HIV testing and counseling services: evidence from the Tanzania service provision assessment survey, 2014-2015.

    Science.gov (United States)

    Bintabara, Deogratius; Nakamura, Keiko; Seino, Kaoruko

    2017-12-22

    Global policy reports, national frameworks, and programmatic tools and guidance emphasize the integration of family planning and HIV testing and counseling services to ensure universal access to reproductive health care and HIV prevention. However, the status of integration between these two services in Tanzanian health facilities is unclear. This study examined determinants of facility readiness for integration of family planning with HIV testing and counseling services in Tanzania. Data from the 2014-2015 Tanzania Service Provision Assessment Survey were analyzed. Facilities were considered ready for integration of family planning with HIV testing and counseling services if they scored ≥ 50% on both family planning and HIV testing and counseling service readiness indices as identified by the World Health Organization. All analyses were adjusted for clustering effects, and estimates were weighted to correct for non-responses and disproportionate sampling. Descriptive, bivariate, and multivariate logistic regression analyses were performed. A total of 1188 health facilities were included in the study. Of all of the health facilities, 915 (77%) reported offering both family planning and HIV testing and counseling services, while only 536 (45%) were considered ready to integrate these two services. Significant determinants of facility readiness for integrating these two services were being government owned [AOR = 3.2; 95%CI, 1.9-5.6], having routine management meetings [AOR = 1.9; 95%CI, 1.1-3.3], availability of guidelines [AOR = 3.8; 95%CI, 2.4-5.8], in-service training of staff [AOR = 2.6; 95%CI, 1.3-5.2], and availability of laboratories for HIV testing [AOR = 17.1; 95%CI, 8.2-35.6]. The proportion of facility readiness for the integration of family planning with HIV testing and counseling in Tanzania is unsatisfactory. The Ministry of Health should distribute and ensure constant availability of guidelines, availability of rapid diagnostic

  10. BE (fuel element)/ZL (interim storage facility) module. Constituents of the fuel BE data base for BE documentation with respect to the disposal planning and the support of the BE container storage administration

    International Nuclear Information System (INIS)

    Hoffmann, V.; Deutsch, S.; Busch, V.; Braun, A.

    2012-01-01

    The securing of spent fuel element disposal from German nuclear power plants is the main task of GNS. This includes the container supply and the disposal analysis and planning. Therefore GNS operates a data base comprising all in Germany implemented fuel elements and all fuel element containers in interim storage facilities. With specific program modules the data base serves an optimized repository planning for all spent fuel elements from German NPPS and the supply of required data for future final disposal. The data base has two functional models: the BE (fuel element) and the ZL (interim storage) module. The contribution presents the data structure of the modules and details of the data base operation.

  11. Retirement planning and expectations of Australian babyboomers: are they ready to retire?

    Science.gov (United States)

    Hunter, Wendy; Wang, Wei; Worsley, Anthony

    2007-10-01

    The "babyboomer" generation, those who were born between 1946 and 1965, account for over 30% of the population in Australia, and it is no surprise that the government is concerned about the financial implications for future healthcare costs. While many babyboomers are more financially secure than previous generations have been on account of compulsory superannuation contributions made over the past 15 years, there are still some who are financially vulnerable and expect to rely on government pensions and welfare assistance. Changes to family structures and job security also mean that those who are less financially secure will need social support. Using an ecological framework model, we explored the retirement expectations and experiences of some Australian babyboomers through focus groups and individual interviews to identify key issues and their plans to address these issues. Four main themes are reported in this paper: retirement attitudes and expectations, finances, health, and food. The results suggested that for many persons retirement equated freedom. Little future planning was undertaken for retirement other than contributing to superannuation schemes, and expectations were reported in general terms, such as wanting to remain independent and healthy and to have time to socialize and travel.

  12. Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

    Science.gov (United States)

    Whitney L. Morrison; Daprato, Rebecca C.

    2016-01-01

    This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

  13. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  14. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... United States Department of Labor, Midgett v. Washington Group International Long Term Disability Plan...) \\9\\, as well as the diagnosis code (such as an ICD-9 code, ICD-10 code, or DSM-IV code) \\10\\, the... of Diseases, 9th revision and 10th revision, respectively. The DSM-IV codes refer to the Diagnostic...

  15. Randomized Controlled Trial of Forward-Planned Intensity Modulated Radiotherapy for Early Breast Cancer: Interim Results at 2 Years

    International Nuclear Information System (INIS)

    Barnett, Gillian C.; Wilkinson, Jennifer S.; Moody, Anne M.; Wilson, Charles B.; Twyman, Nicola; Wishart, Gordon C.; Burnet, Neil G.; Coles, Charlotte E.

    2012-01-01

    Purpose: This single-center randomized trial was designed to investigate whether intensity-modulated radiotherapy (IMRT) reduces late toxicity in patients with early-stage breast cancer. Methods and Materials: The standard tangential plans of 1,145 nonselected patients were analyzed. The patients with inhomogeneous plans were randomized to a simple method of forward-planned IMRT or standard radiotherapy (RT). The primary endpoint was serial photographic assessment of breast shrinkage. Results: At 2 years, no significant difference was found in the development of any photographically assessed breast shrinkage between the patients randomized to the interventional or control group (odds ratio, 1.51; 95% confidence interval, 0.83–1.58; p = .41). The patients in the control group were more likely to develop telangiectasia than those in the IMRT group (odds ratio, 1.68; 95% confidence interval 1.13–2.40; p = .009). Poor baseline surgical cosmesis resulted in poor overall cosmesis at 2 years after RT. In patients who had good surgical cosmesis, those randomized to IMRT were less likely to deteriorate to a moderate or poor overall cosmesis than those in the control group (odds ratio, 0.63; 95% confidence interval, 0.39–1.03, p = .061). Conclusions: IMRT can lead to a significant reduction in telangiectasia at comparatively early follow-up of only 2 years after RT completion. An important component of breast induration and shrinkage will actually result from the surgery and not from the RT. Surgical cosmesis is an important determinant of overall cosmesis and could partially mask the longer term benefits of IMRT at this early stage.

  16. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  17. Sampling and analysis plan for the gunite and associated tanks interim remedial action, wall coring and scraping at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This Sampling and Analysis Plan documents the procedures for collecting and analyzing wall core and wall scraping samples from the Gunite and Associated Tanks. These activities are being conducted to support the Comprehensive Environmental Response, Compensation, and Liability Act at the gunite and associated tanks interim remedial action at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The sampling and analysis activities will be performed in concert with sludge retrieval and sluicing of the tanks. Wall scraping and/or wall core samples will be collected from each quadrant in each tank by using a scraping sampler and/or a coring drill deployed by the Houdini robot vehicle. Each sample will be labeled, transported to the Radioactive Materials Analytical Laboratory, and analyzed for physical and radiological characteristics, including total activity, gross alpha, gross beta, radioactive strontium and cesium, and other alpha- and gamma-emitting radionuclides. The data quality objectives process, based on US Environmental Protection Agency guidance, was applied to identify the objectives of this sampling and analysis. The results of the analysis will be used to (1) validate predictions of a strontium concrete diffusion model, (2) estimate the amount of radioactivity remaining in the tank shells, (3) provide information to correlate with measurements taken by the Gunite Tank Isotope Mapping Probe and the Characterization End Effector, and (4) estimate the performance of the wall cleaning system. This revision eliminates wall-scraping samples from all tanks, except Tank W-3. The Tank W-3 experience indicated that the wall scrapper does not collect sufficient material for analysis

  18. Engineering and planning for reactor 105-C interim safe storage project subcontract no. 0100C-SC-G0001 conceptual design report. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The 105-C Reactor, one of eight surplus production reactors at the Hanford Site, has been proposed by the U.S. Department of Energy, Richland, Operations Office to be the first large-scale technology demonstration project in the decontamination and decommissioning (D ampersand D) focus area as part of the project for dismantlement and interim safe storage. The 105-C Reactor will be placed in an interim safe storage condition, then undergo the decontamination and decommissioning phase. After D ampersand D, the reactor will be placed in long- term safe storage. This report provides the conceptual design for these activities

  19. Defining a New North Star: Aligning Local Control Accountability Plans to College and Career Readiness. Policy Brief

    Science.gov (United States)

    Beach, Paul; Thier, Michael; Lench, Sarah Collins; Coleman, Matt

    2015-01-01

    Educators have the increasingly difficult task of preparing students to live, learn, and work in the 21st century. Amidst those challenges, a growing body of research suggests that college and career readiness depends upon students' ability to think critically, learn how to learn, communicate, and collaborate. The No Child Left Behind (NCLB) era…

  20. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  1. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    International Nuclear Information System (INIS)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  2. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... customers, and the O&M Committee to ensure that operation and maintenance is properly funded and charged.... Southeastern Power Administration (Southeastern) is including three rate alternatives. All of the rate alternatives have a revenue requirement of $59,600,000. Rate Scenario 1--Interim Operating Plan The final...

  3. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  4. Vismodegib in patients with advanced basal cell carcinoma (STEVIE): a pre-planned interim analysis of an international, open-label trial.

    Science.gov (United States)

    Basset-Seguin, Nicole; Hauschild, Axel; Grob, Jean-Jacques; Kunstfeld, Rainer; Dréno, Brigitte; Mortier, Laurent; Ascierto, Paolo A; Licitra, Lisa; Dutriaux, Caroline; Thomas, Luc; Jouary, Thomas; Meyer, Nicolas; Guillot, Bernard; Dummer, Reinhard; Fife, Kate; Ernst, D Scott; Williams, Sarah; Fittipaldo, Alberto; Xynos, Ioannis; Hansson, Johan

    2015-06-01

    The Hedgehog pathway inhibitor vismodegib has shown clinical benefit in patients with advanced basal cell carcinoma and is approved for treatment of patients with advanced basal cell carcinoma for whom surgery is inappropriate. STEVIE was designed to assess the safety of vismodegib in a situation similar to routine practice, with a long follow-up. In this multicentre, open-label trial, adult patients with histologically confirmed locally advanced basal cell carcinoma or metastatic basal cell carcinoma were recruited from regional referral centres or specialist clinics. Eligible patients were aged 18 years or older with an Eastern Cooperative Oncology Group (ECOG) performance status of 0-2, and adequate organ function. Patients with locally advanced basal cell carcinoma had to have been deemed ineligible for surgery. All patients received 150 mg oral vismodegib capsules once a day on a continuous basis in 28-day cycles. The primary objective was safety (incidence of adverse events until disease progression or unacceptable toxic effects), with assessments on day 1 of each treatment cycle (28 days) by principal investigator and coinvestigators at the site. Efficacy variables were assessed as secondary endpoints. The safety evaluable population included all patients who received at least one dose of study drug. Patients with histologically confirmed basal cell carcinoma who received at least one dose of study drug were included in the efficacy analysis. An interim analysis was pre-planned after 500 patients achieved 1 year of follow-up. This trial is registered with ClinicalTrials.gov, number NCT01367665. The study is still ongoing. Between June 30, 2011, and Nov 6, 2014, we enrolled 1227 patients. At clinical cutoff (Nov 6, 2013), 499 patients (468 with locally advanced basal cell carcinoma and 31 with metastatic basal cell carcinoma) had received study drug and had the potential to be followed up for 12 months or longer. Treatment was discontinued in 400 (80

  5. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  6. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  7. K-Reactor readiness

    International Nuclear Information System (INIS)

    Rice, P.D.

    1991-01-01

    This document describes some of the more significant accomplishments in the reactor restart program and details the magnitude and extent of the work completed to bring K-Reactor to a state of restart readiness. The discussion of restart achievements is organized into the three major categories of personnel, programs, and plant. Also presented is information on the scope and extent of internal and external oversight of the efforts, as well as some details on the startup plan

  8. 77 FR 72686 - HACCP Plan Reassessment for Not-Ready-To-Eat Comminuted Poultry Products and Related Agency...

    Science.gov (United States)

    2012-12-06

    ... the case- patient's home was positive for the pathogen associated with the outbreak. Shopper card... products that they need to reassess their HACCP Plans, have already been accounted for in the Pathogen... announce this document online through the FSIS Web page located at http://www.fsis.usda.gov/regulations...

  9. Hanford tanks initiative work plan -- subsurface characterization to support the closure-readiness demonstration for tank 241-AX-104

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D.B.

    1996-09-27

    This document presents a plan for subsurface investigation near 241-AX-104 Single-Shell tank. Objectives of the investigation are soil sampling and analyses (physical and chemical), local stratigraphic correlation, groundwater background characterization, and geophysical surveys. The primary purpose of the investigation is to supply physical and hydraulic properties for numerical modeling of vadose zone flow and transport.

  10. 324 Building B-Cell Pressurized Water Reactor Spent Fuel Packaging & Shipment RL Readiness Assessment Final Report [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    HUMPHREYS, D C

    2002-08-01

    A parallel readiness assessment (RA) was conducted by independent Fluor Hanford (FH) and U. S. Department of Energy, Richland Operations Office (RL) team to verify that an adequate state of readiness had been achieved for activities associated with the packaging and shipping of pressurized water reactor fuel assemblies from B-Cell in the 324 Building to the interim storage area at the Canister Storage Building in the 200 Area. The RL review was conducted in parallel with the FH review in accordance with the Joint RL/FH Implementation Plan (Appendix B). The RL RA Team members were assigned a FH RA Team counterpart for the review. With this one-on-one approach, the RL RA Team was able to assess the FH Team's performance, competence, and adherence to the implementation plan and evaluate the level of facility readiness. The RL RA Team agrees with the FH determination that startup of the 324 Building B-Cell pressurized water reactor spent nuclear fuel packaging and shipping operations can safely proceed, pending completion of the identified pre-start items in the FH final report (see Appendix A), completion of the manageable list of open items included in the facility's declaration of readiness, and execution of the startup plan to operations.

  11. BE (fuel element)/ZL (interim storage facility) module. Constituents of the fuel BE data base for BE documentation with respect to the disposal planning and the support of the BE container storage administration; BE/ZL-Modul. Bestandteile der BE-Datenbank zur BE-Dokumentation fuer die Entsorgungsplanung sowie zur Unterstuetzung der BE-Behaelterlagerverwaltung

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, V.; Deutsch, S.; Busch, V. [GNS Gesellschaft fuer Nuklear-Service mbH, Essen (Germany); Braun, A. [WTI Wissenschaftlich-Technische Ingenieurberatung GmbH, Juelich (Germany)

    2012-11-01

    The securing of spent fuel element disposal from German nuclear power plants is the main task of GNS. This includes the container supply and the disposal analysis and planning. Therefore GNS operates a data base comprising all in Germany implemented fuel elements and all fuel element containers in interim storage facilities. With specific program modules the data base serves an optimized repository planning for all spent fuel elements from German NPPS and the supply of required data for future final disposal. The data base has two functional models: the BE (fuel element) and the ZL (interim storage) module. The contribution presents the data structure of the modules and details of the data base operation.

  12. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  13. Film based verification of calculation algorithms used for brachytherapy planning-getting ready for upcoming challenges of MBDCA

    Directory of Open Access Journals (Sweden)

    Grzegorz Zwierzchowski

    2016-08-01

    Full Text Available Purpose: Well-known defect of TG-43 based algorithms used in brachytherapy is a lack of information about interaction cross-sections, which are determined not only by electron density but also by atomic number. TG-186 recommendations with using of MBDCA (model-based dose calculation algorithm, accurate tissues segmentation, and the structure’s elemental composition continue to create difficulties in brachytherapy dosimetry. For the clinical use of new algorithms, it is necessary to introduce reliable and repeatable methods of treatment planning systems (TPS verification. The aim of this study is the verification of calculation algorithm used in TPS for shielded vaginal applicators as well as developing verification procedures for current and further use, based on the film dosimetry method. Material and methods : Calibration data was collected by separately irradiating 14 sheets of Gafchromic® EBT films with the doses from 0.25 Gy to 8.0 Gy using HDR 192Ir source. Standard vaginal cylinders of three diameters were used in the water phantom. Measurements were performed without any shields and with three shields combination. Gamma analyses were performed using the VeriSoft® package. Results : Calibration curve was determined as third-degree polynomial type. For all used diameters of unshielded cylinder and for all shields combinations, Gamma analysis were performed and showed that over 90% of analyzed points meets Gamma criteria (3%, 3 mm. Conclusions : Gamma analysis showed good agreement between dose distributions calculated using TPS and measured by Gafchromic films, thus showing the viability of using film dosimetry in brachytherapy.

  14. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  15. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  16. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  17. Sequential interim analyses of survival data in DNA microarray experiments

    Directory of Open Access Journals (Sweden)

    Jung Klaus

    2011-04-01

    Full Text Available Abstract Background Discovery of biomarkers that are correlated with therapy response and thus with survival is an important goal of medical research on severe diseases, e.g. cancer. Frequently, microarray studies are performed to identify genes of which the expression levels in pretherapeutic tissue samples are correlated to survival times of patients. Typically, such a study can take several years until the full planned sample size is available. Therefore, interim analyses are desirable, offering the possibility of stopping the study earlier, or of performing additional laboratory experiments to validate the role of the detected genes. While many methods correcting the multiple testing bias introduced by interim analyses have been proposed for studies of one single feature, there are still open questions about interim analyses of multiple features, particularly of high-dimensional microarray data, where the number of features clearly exceeds the number of samples. Therefore, we examine false discovery rates and power rates in microarray experiments performed during interim analyses of survival studies. In addition, the early stopping based on interim results of such studies is evaluated. As stop criterion we employ the achieved average power rate, i.e. the proportion of detected true positives, for which a new estimator is derived and compared to existing estimators. Results In a simulation study, pre-specified levels of the false discovery rate are maintained in each interim analysis, where reduced levels as used in classical group sequential designs of one single feature are not necessary. Average power rates increase with each interim analysis, and many studies can be stopped prior to their planned end when a certain pre-specified power rate is achieved. The new estimator for the power rate slightly deviates from the true power rate but is comparable to other estimators. Conclusions Interim analyses of microarray experiments can provide

  18. Magnetic fusion: Environmental Readiness Document

    International Nuclear Information System (INIS)

    1981-03-01

    Environmental Readiness Documents are prepared periodically to review and evaluate the environmental status of an energy technology during the several phases of development of that technology. Through these documents, the Office of Environment within the Department of Energy provides an independent and objective assessment of the environmental risks and potential impacts associated with the progression of the technology to the next stage of development and with future extensive use of the technology. This Environmental Readiness Document was prepared to assist the Department of Energy in evaluating the readiness of magnetic fusion technology with respect to environmental issues. An effort has been made to identify potential environmental problems that may be encountered based upon current knowledge, proposed and possible new environmental regulations, and the uncertainties inherent in planned environmental research

  19. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  20. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  1. Central waste complex interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    Cain, F.G.

    1995-05-15

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste.

  2. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  3. Preventive maintenance study : interim report.

    Science.gov (United States)

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  4. Getting Ready for Pregnancy

    Science.gov (United States)

    ... Global Map Premature Birth Report Cards Careers Archives Pregnancy Before or between pregnancies Nutrition, weight & fitness Prenatal ... ready for pregnancy: Preconception health Getting ready for pregnancy: Preconception health E-mail to a friend Please ...

  5. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  6. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  7. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  8. 244-AR Vault Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    LANEY, T.

    2000-01-01

    The 244-AR Vault Facility, constructed between 1966 and 1968, was designed to provide lag storage and treatment for the Plutonium-Uranium Extraction Facility (PUREX) tank farm sludges. Tank farm personnel transferred the waste from the 244-AR Vault Facility to B Plant for recovery of cesium and strontium. B Plant personnel then transferred the treatment residuals back to the tank farms for storage of the sludge and liquids. The last process operations, which transferred waste supporting the cesium/strontium recovery mission, occurred in April 1978. After the final transfer in 1978, the 244-AR facility underwent a cleanout. However, 2,271 L (600 gal) of sludge were left in Tank 004AR from an earlier transfer from Tank 241-AX-104. When the cleanout was completed, the facility was placed in a standby status. The sludge had been transferred to Tank 004AR to support Pacific Northwest National Laboratory [PNNL] vitrification work. Documentation of waste transfers suggests that a portion of the sludge may have been moved from Tank 004AR to Tank 002AR in preparation for transfer back to the AX Tank Farm; however, quantities of the sludge that were moved to Tank 002AR from that transfer must be estimated

  9. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  10. Nuclear explosives testing readiness evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Valk, T.C.

    1993-09-01

    This readiness evaluation considers hole selection and characterization, verification, containment issues, nuclear explosive safety studies, test authorities, event operations planning, canister-rack preparation, site preparation, diagnostic equipment setup, device assembly facilities and processes, device delivery and insertion, emplacement, stemming, control room activities, readiness briefing, arming and firing, test execution, emergency response and reentry, and post event analysis to include device diagnostics, nuclear chemistry, and containment. This survey concludes that the LLNL program and its supporting contractors could execute an event within six months of notification, and a second event within the following six months, given the NET group`s evaluation and the following three restraints: (1) FY94 (and subsequent year) funding is essentially constant with FY93, (2) Preliminary work for the initial event is completed to the historical sic months status, (3) Critical personnel, currently working in dual use technologies, would be recallable as needed.

  11. Managing Military Readiness

    Science.gov (United States)

    2017-02-01

    Managing Military Readiness by Laura J. Junor STRATEGIC PERSPECTIVES 23 Center for Strategic Research Institute for National Strategic Studies...Marine Corps) Managing Military Readiness Institute for National Strategic Studies Strategic Perspectives, No. 23 Series Editor: Laura J. Junor National...discussion is a basic tenet of production theory , it had not been commonly applied to readiness management until recently. The important point here is that

  12. Choosing or becoming an interim administrator.

    Science.gov (United States)

    Alley, Nancy M

    2005-01-01

    Filling an administrative position on an interim basis requires careful deliberation even when the decision has to be made quickly. A poor fit, even for a short-term position, can lead to problems for the interim administrator, the subsequent permanent administrator, faculty, staff, students, and the nursing program. This article poses questions for decision makers who are contemplating filling a position with an interim appointee. These decision makers must determine the need for an interim administrator, his or her role, the anticipated length of an interim appointment, and whether the interim appointee can apply for the permanent position. In addition, relevant questions are presented for those persons who are considering accepting an interim position, including questions about the position itself and their preparation and personal goals and considerations for leaving the temporary position.

  13. Primer for the Interim Chair

    Science.gov (United States)

    Soltys, Stephen M.

    2011-01-01

    Objective: Being successful in the role of an Interim Chair requires an approach to transitional leadership that is different from that of individuals filling the Chair role permanently. This article reviews pertinent literature on the topic. Method: The author reviewed the literature, cited pertinent articles, and supplemented with personal…

  14. FRACTIONAL CRYSTALLIZATION TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    International Nuclear Information System (INIS)

    HERTING DL

    2008-01-01

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste

  15. College Readiness for All?

    Science.gov (United States)

    Hess, Frederick M.

    2016-01-01

    In recent years, American education has enthusiastically adopted the mantra of "college readiness for all." What's not to like about that? Frederick Hess says that although he considers college readiness an admirable goal, he has serious reservations about advocates, funders, and policymakers imposing this norm across all schools. His…

  16. Readiness for living technology

    DEFF Research Database (Denmark)

    Péronard, Jean-Paul de Cros

    2013-01-01

    This paper is a comparative analysis between workers in healthcare with high and low degree of readiness for living technology such as robotics. To explore the differences among workers’ readiness for robotics in healthcare, statistical analysis was conducted in the data set obtained from 200...

  17. Preschool Children's School Readiness

    Science.gov (United States)

    Pekdogan, Serpil; Akgül, Esra

    2017-01-01

    The purpose of this study is to examine preschool teachers' perspectives about children's school readiness. Qualitative and quantitative research methods were used in the study as a mixed method research. Data, in the quantitative aspects of the research, were collected through the use of "School Readiness Form" developed by Boz (2004)…

  18. Environmental readiness document magnetohydrodynamics

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    The major areas of environmental concern with regard to the commercialization of coal-fired MHD generators are discussed. MHD technology and expectations about its future utilization are described. Information pertinent to the technology was drawn from the DOE technology program office and from an Environmental Development Plan developed for the technology by EV and the program office through an Environmental Coordination Committee. The environmental concerns associated with the technology are examined, and the current status of knowledge about each concern and its potential seriousness and manageability through regulation and control technology, is discussed. Present and projected societal capabilities to reduce and control undesirable environmental, health, safety, and related social impacts to a level of public acceptability -- as reflected in current and proposed environmental standards -- which will allow the technology to be commercialized and utilized in a timely manner are summarized. The ERD as a whole thus provides an assessment, within the limits of available knowledge and remaining uncertainties, of the future environmental readiness of the technology to contribute to the meeting of the Nation's energy needs. (WHK)

  19. Interim report on the Global Design Effort Global International Linear Collider (ILC) R&D

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, M.

    2011-04-30

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  20. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  1. Medical Readiness of the Reserve Component

    Science.gov (United States)

    2012-01-01

    51 Some Dental Plans Are Cheaper—Comparison of Five Treatment Sources...in need of such care, 49 percent had more than one tooth needing treatment , 71 percent had periodontal disease, and 68 percent required one or more...preventive dental care, such as annual teeth cleaning (prophylaxis), fluo- ride treatment , and periodontal care. Complicated Nature of Medical Readiness

  2. Interim Bayesian Persuasion: First Steps

    OpenAIRE

    Perez, Eduardo

    2015-01-01

    This paper makes a first attempt at building a theory of interim Bayesian persuasion. I work in a minimalist model where a low or high type sender seeks validation from a receiver who is willing to validate high types exclusively. After learning her type, the sender chooses a complete conditional information structure for the receiver from a possibly restricted feasible set. I suggest a solution to this game that takes into account the signaling potential of the sender's choice.

  3. Interim district energy implementation

    Energy Technology Data Exchange (ETDEWEB)

    Fearnley, R.; Susak, W. [City of Vancouver, BC (Canada); Johnstone, I. [BCG Services Inc., Vancouver, BC (Canada)

    2001-07-01

    The concept of district energy was introduced in the City of North Vancouver, a city of 45,000, in 1997. A preliminary study was completed in 1997, followed by a tour of some district energy facilities in Finland in the same year. In 1999 a large district energy study was completed by a consultant. The study indicated the need for an investment of $15 million to implement district heating in the City. Lack of sufficient financial resources and immediately connectable heat load, the project was considered a non-starter. Some of the other factors leading to shelving the project included no current significant pricing advantages over competing energy sources and no current opportunity for cogeneration, given the low price that BC Hydro is willing to pay for independently produced power. The project, although shelved for the moment, has not been discarded. Planning and exploration are continuing, aided by the City's commitment to energy efficiency and conservation, its long term planning horizon and its significant influence over the development of some prime real estate.

  4. Technology Readiness Level Guidebook

    Science.gov (United States)

    2017-09-01

    This guidebook provides the necessary information for conducting a Technology Readiness Level (TRL) Assessment. TRL Assessments are a tool for determining the maturity of technologies and identifying next steps in the research process. This guidebook...

  5. Measuring Success: Metrics that Link Supply Chain Management to Aircraft Readiness

    National Research Council Canada - National Science Library

    Balestreri, William

    2002-01-01

    This thesis evaluates and analyzes current strategic management planning methods that develop performance metrics linking supply chain management to aircraft readiness, Our primary focus is the Marine...

  6. Concept of economic readiness levels assessment

    Science.gov (United States)

    Yuniaristanto, Sutopo, W.; Widiyanto, A.; Putri, A. S.

    2017-11-01

    This research aims to build a concept of Economic Readiness Level (ERL) assessment for incubation center. ERL concept is arranged by considering both market and business aspects. Every aspect is divided into four phases and each of them consists of some indicators. Analytic Hierarchy Process (AHP) is used to develop the ERL in calculating the weight of every single aspect and indicator. Interval scale between 0 and 4 is also applied in indicator assessment. In order to calculate ERL, score in every indicator and the weight of both the aspect and indicator are considered. ERL value is able to show in detail the innovative product readiness level from economic sight, market and business aspect. There are four levels in Economic Readiness Level scheme which are investigation, feasibility, planning and introduction.

  7. Locating Interim Assessments within Teachers' Assessment Practice

    Science.gov (United States)

    Riggan, Matthew; Olah, Leslie Nabors

    2011-01-01

    Promising research on the teaching and learning impact of classroom-embedded formative assessment has spawned interest in a broader array of assessment tools and practices, including interim assessment. Although researchers have begun to explore the impact of interim assessments in the classroom, like other assessment tools and practices, they…

  8. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  9. Guidelines for Preparing Interim Technical Reports

    International Development Research Centre (IDRC) Digital Library (Canada)

    IDRC CRDI

    The interim technical report explains what was achieved with the money and time spent on a project during a specific reporting period. The interim report specifically .... o knowledge creation (new knowledge embodied in forms other than publications or reports: new technologies, new methodologies, new curricula, new ...

  10. Vet Centers. Interim final rule.

    Science.gov (United States)

    2015-08-04

    The Department of Veterans Affairs (VA) is amending its medical regulation that governs Vet Center services. The National Defense Authorization Act for Fiscal Year 2013 (the 2013 Act) requires Vet Centers to provide readjustment counseling services to broader groups of veterans, members of the Armed Forces, including a member of a reserve component of the Armed Forces, and family members of such veterans and members. This interim final rule amends regulatory criteria to conform to the 2013 Act, to include new and revised definitions.

  11. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  12. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  13. ISOE EG-SAM interim report - Report on behalf of the Sub expert Group

    International Nuclear Information System (INIS)

    Harris, Willie; Miller, David W.; Djeffal, Salah; Anderson, Ellen; Couasnon, Olivier; Hagemeyer, Derek; Sovijarvi, Jukka; Amaral, Marcos A.; Tarzia, J.P.; Schmidt, Claudia; Fritioff, Karin; Kaulard, Joerg; Lance, Benoit; Fritioff, Karin; Schieber, Caroline; Hayashida, Yoshihisa; Doty, Rick

    2014-01-01

    During its November 2012 meeting, the expert group decided to develop an interim (preliminary) report before the end of 2013 (with a general perspective and discussion of specific severe accident management worker dose issues), and to finalize the report by organizing the international workshop of 2014 to address national experiences, which will be incorporated to the report. The work of the EG-SAM focuses on radiation protection management and organization, radiation protection training and exercises related to severe accident management, facility configuration and readiness, worker protection, radioactive materials, contamination controls and logistics and key lessons learned especially from the TMI, Chernobyl and Fukushima Dai-ichi accidents. This interim report was completed through intensive work of all Group members nominated by the ISOE, and was accomplished during EG-SAM meetings through 2012-2013. This document gathers the different presentations given by the sub expert groups in charge of each chapter of the report

  14. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  15. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  16. YWCA Vocational Readiness Package.

    Science.gov (United States)

    Scott, Jeanne

    This document outlines, in detail, the Vocational Readiness Package for young girls, which is a week-long program utilizing simulation games and role-playing, while employing peer group counseling techniques to dramatize the realities concerning women in marriage and careers today. After three years of using this program, the authors have compiled…

  17. GIS Readiness Survey 2014

    DEFF Research Database (Denmark)

    Schrøder, Lise; Hvingel, Line Træholt; Hansen, Henning Sten

    2014-01-01

    The GIS Readiness Survey 2014 is a follow-up to the corresponding survey that was carried out among public institutions in Denmark in 2009. The present survey thus provides an updated image of status and challenges in relation to the use of spatial information, the construction of the com- mon...

  18. "Ready to Acquire"

    DEFF Research Database (Denmark)

    Yetton, Philip; Henningsson, Stefan; Bjørn-Andersen, Niels

    2013-01-01

    This article describes the experiences of Danisco (a global food ingredients company) as it followed a growth-by-acquisition business strategy, focusing on how a new CIO built the IT resources to ensure the IT organization was "ready to acquire." We illustrate how these IT capabilities expedited...

  19. Proposal of performance indicators/model for Operational Readiness Verification (ORV) at restart after a planned shutdown; Framtagning av bedoemningsfaktorer/modell foer utvaerdering av driftklarhetsverifiering (DKV) infoer uppstart efter revisionsavstaellning

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, Erik; Nygren, Magnus [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science

    2005-12-15

    The objectives of the study reported here were to propose a model that can be used in the analysis of possible future ORV-related events and to outline a set of performance indicators that can be used by the inspectorate to assess a utility's level of readiness if an ORV-event should take place. Together the two objectives serve to improve the inspectorate's ability to ensure that the utilities maintain an adequate capability to respond. The background for the current study is the nine ORV events that occurred in Sweden between 1995- 1998, as well as the findings of a previous study of safety during outage and restart of nuclear power plants project. This study found that the three levels or types of tests that occur in ORV were used according to need rather than according to a predefined arrangement or procedure, and that tasks were adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. The organisation's coping with the complexity of ORV was discussed by the relation between expectations and surprises, how planning was used as control, attention to details, and the practices of shift changes. It is a truism that accidents are analysed and interpreted relative to a commonly accepted understanding of their nature. This understanding is, however, relative rather than absolute, and has changed significantly during the last decade. In the 1990s, accidents were analysed step by step, and explanations and recommendations therefore emphasised specific rather than generic solutions. The present study illustrates this by going through the responses to the nine ORV events. Following that, the nine events are analysed anew using a contemporary understanding of accidents (a systemic model), which emphasises that incidents more often arise from context induced performance variability than from failures of people. The alternative interpretation provided by a systemic model is illustrated by a detailed

  20. Ready, set, go . . . well maybe

    Energy Technology Data Exchange (ETDEWEB)

    Alexandre, Melanie M; Bartolome, Terri-Lynn C

    2011-02-28

    The agenda for this presentation is: (1) understand organizational readiness for changes; (2) review benefits and challenges of change; (3) share case studies of ergonomic programs that were 'not ready' and some that were 'ready'; and (4) provide some ideas for facilitating change.

  1. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  2. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  3. Dimensions of community and organizational readiness for change.

    Science.gov (United States)

    Castañeda, Sheila F; Holscher, Jessica; Mumman, Manpreet K; Salgado, Hugo; Keir, Katherine B; Foster-Fishman, Pennie G; Talavera, Gregory A

    2012-01-01

    Readiness can influence whether health interventions are implemented in, and ultimately integrated into, communities. Although there is significant research interest in readiness and capacity for change, the measurement of these constructs is still in its infancy. The purpose of this review was to integrate existing assessment models of community and organizational readiness. The database PubMed was searched for articles; articles, book chapters, and practitioner guides identified as references cited in the list of core articles. Studies were included if they met the following criteria: (1) Empirical research, (2) identified community or organizational readiness for innovative health programming in the study's title, purpose, research questions, or hypotheses, and (3) identified methods to measure these constructs. Duplicate articles were deleted and measures published before 1995 were excluded. The search yielded 150 studies; 13 met all criteria. This article presents the results of a critical review of 13 community and organizational readiness assessment models, stemming from articles, chapters, and practitioner's guides focusing on assessing, developing, and sustaining community and organizational readiness for innovative public health programs. Readiness is multidimensional and different models place emphasis on different components of readiness, such as (1) community and organizational climate that facilitates change, (2) attitudes and current efforts toward prevention, (3) commitment to change, and (4) capacity to implement change. When initiating the program planning process, it is essential to assess these four domains of readiness to determine how they apply to the nuances across different communities. Thus, community-based participatory research (CBPR) partnerships, in efforts to focus on public health problems, may consider using readiness assessments as a tool for tailoring intervention efforts to the needs of the community.

  4. Cloud Ready Applications Composed via HTN Planning

    NARCIS (Netherlands)

    Georgievski, Ilche; Nizamic, Faris; Lazovik, Aliaksandr; Aiello, Marco

    2017-01-01

    Modern software applications are increasingly deployed and distributed on infrastructures in the Cloud, and then offered as a service. Before the deployment process happens, these applications are being manually - or with some predefined scripts - composed from various smaller interdependent

  5. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  6. Modernization and refurbishment of the Central Interim Storage

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  7. Developing new transportable storage casks for interim dry storage

    International Nuclear Information System (INIS)

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R.

    2004-01-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication

  8. The role and meaning of interim housing in housing first programs for people experiencing homelessness and mental illness.

    Science.gov (United States)

    Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky

    2014-07-01

    The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.

  9. DOE-owned spent nuclear fuel strategic plan. Revision 1

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) is responsible for safely and efficiently managing DOE-owned spent nuclear fuel (SNF) and SNF returned to the US from foreign research reactors (FRR). The fuel will be treated where necessary, packaged suitable for repository disposal where practicable, and placed in interim dry storage. These actions will remove remaining vulnerabilities, make as much spent fuel as possible ready for ultimate disposition, and substantially reduce the cost of continued storage. The goal is to complete these actions in 10 years. This SNF Strategic Plan updates the mission, vision, objectives, and strategies for the management of DOE-owned SNF articulated by the SNF Strategic Plan issued in December 1994. The plan describes the remaining issues facing the EM SNF Program, lays out strategies for addressing these issues, and identifies success criteria by which program progress is measured. The objectives and strategies in this plan are consistent with the following Em principles described by the Assistance Secretary in his June 1996 initiative to establish a 10-year time horizon for achieving most program objectives: eliminate and manage the most serious risks; reduce mortgage and support costs to free up funds for further risk reduction; protect worker health and safety; reduce generation of wastes; create a collaborative relationship between DOE and its regulators and stakeholders; focus technology development on cost and risk reduction; and strengthen management and financial control

  10. Transportation plan repository and archive.

    Science.gov (United States)

    2011-04-01

    This project created a repository and archive for transportation planning documents in Texas within the : established Texas A&M Repository (http://digital.library.tamu.edu). This transportation planning archive : and repository provides ready access ...

  11. Organisational readiness for introducing a performance management system

    Directory of Open Access Journals (Sweden)

    Michael Ochurub

    2012-09-01

    Full Text Available Orientation: The successful introduction of performance management systems to the public service requires careful measurement of readiness for change.Research purpose: This study investigated the extent to which employees were ready for change as an indication of whether their organisation was ready to introduce a performance management system (PMS.Motivation for the study: Introducing system changes in organisations depends on positive employee preconditions. There is some debate over whether organisations can facilitate these preconditions. This research investigates change readiness linked to the introduction of a PMS in a public sector organisation. The results add to the growing literature on levels of change readiness.Research design, approach and method: The researchers used a quantitative, questionnairebased design. Because the organisation was large, the researchers used stratified sampling to select a sample from each population stratum. The sample size was 460, which constituted 26% of the total population. They used a South African change readiness questionnaire to elicit employee perceptions and opinions.Main findings: The researchers found that the organisation was not ready to introduce a PMS. The study identified various challenges and key factors that were negatively affecting the introduction of a PMS.Practical/managerial implications: The intention to develop and introduce performance management systems is generally to change the attitudes, values and approaches of managers and employees to the new strategies, processes and plans to improve productivity and performance. However, pre-existing conditions and attitudes could have an effect. It is essential to ensure that organisations are ready to introduce performance management systems and to provide sound change leadership to drive the process effectively. This study contributes to the body of knowledge about the challenges and factors organisations should consider when they

  12. Organisational readiness for introducing a performance management system

    Directory of Open Access Journals (Sweden)

    Michael Ochurub

    2012-09-01

    Full Text Available Orientation: The successful introduction of performance management systems to the public service requires careful measurement of readiness for change. Research purpose: This study investigated the extent to which employees were ready for change as an indication of whether their organisation was ready to introduce a performance management system (PMS. Motivation for the study: Introducing system changes in organisations depends on positive employee preconditions. There is some debate over whether organisations can facilitate these preconditions. This research investigates change readiness linked to the introduction of a PMS in a public sector organisation. The results add to the growing literature on levels of change readiness. Research design, approach and method: The researchers used a quantitative, questionnairebased design. Because the organisation was large, the researchers used stratified sampling to select a sample from each population stratum. The sample size was 460, which constituted 26% of the total population. They used a South African change readiness questionnaire to elicit employee perceptions and opinions. Main findings: The researchers found that the organisation was not ready to introduce a PMS. The study identified various challenges and key factors that were negatively affecting the introduction of a PMS. Practical/managerial implications: The intention to develop and introduce performance management systems is generally to change the attitudes, values and approaches of managers and employees to the new strategies, processes and plans to improve productivity and performance. However, pre-existing conditions and attitudes could have an effect. It is essential to ensure that organisations are ready to introduce performance management systems and to provide sound change leadership to drive the process effectively. This study contributes to the body of knowledge about the challenges and factors organisations should consider when

  13. Career Readiness: Has Its Time Finally Come?

    Science.gov (United States)

    DeWitt, Stephen

    2012-01-01

    In 2010, the Association for Career and Technical Education (ACTE) released a "What Is Career Ready?" definition. As the career-readiness definition explains, there is much overlap between "college readiness" and "career readiness," but academic preparedness for college alone is not enough to be truly career-ready.…

  14. EMCS Retrofit Analysis - Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  15. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  16. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  17. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  18. Transuranic storage and assay facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    Porten, D.R., Fluor Daniel Hanford

    1997-02-12

    The Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis document provides the authorization basis for the interim operation and restriction on interim operations for the TRUSAF. The TRUSAF ISB demonstrates that the TRUSAF can be operated safely, protecting the workers, the public, and the environment. The previous safety analysis document TRUSAF Hazards Identification and Evaluation (WHC 1987) is superseded by this document.

  19. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120.890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may...

  20. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  1. Interim financial reporting in function of proper decision making

    Directory of Open Access Journals (Sweden)

    Kaćanski Slobodan

    2014-01-01

    Full Text Available This paper analyses the attributes of interim financial reporting, as well as performs overview and interpretation of International Accounting Standard 34 which deals with this issue. The paper emphasizes risk and effects of interim financial statements implementation in decision making process. Time and cost limitations significantly influence the level of reliability on interim reports since those reports were not audited.

  2. Interim financial reporting in function of proper decision making

    OpenAIRE

    Kaćanski Slobodan; Tomašević Stevan; Vlaović-Begović Sanja

    2014-01-01

    This paper analyses the attributes of interim financial reporting, as well as performs overview and interpretation of International Accounting Standard 34 which deals with this issue. The paper emphasizes risk and effects of interim financial statements implementation in decision making process. Time and cost limitations significantly influence the level of reliability on interim reports since those reports were not audited.

  3. Ready or Not? Criteria for Marriage Readiness among Emerging Adults

    Science.gov (United States)

    Carroll, Jason S.; Badger, Sarah; Willoughby, Brian J.; Nelson, Larry J.; Madsen, Stephanie D.; Barry, Carolyn McNamara

    2009-01-01

    This study examined emerging adults' criteria for marriage readiness and explored how these criteria are associated with their current attitudes and behaviors. This article establishes the psychometric value of the Criteria for Marriage Readiness Questionnaire and reports on a study of 788 emerging adults recruited from five college sites across…

  4. Advantages on dry interim storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  5. Advantages on dry interim storage for spent nuclear fuel

    International Nuclear Information System (INIS)

    Romanato, L.S.; Rzyski, B.M.

    2006-01-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  6. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  7. Approaches to interim analysis of cancer randomised clinical trials with time to event endpoints: A survey from the Italian National Monitoring Centre for Clinical Trials

    Directory of Open Access Journals (Sweden)

    De Rosa Marisa

    2008-07-01

    Full Text Available Abstract Background Although interim analysis approaches in clinical trials are widely known, information on current practice of planned monitoring is still scarce. Reports of studies rarely include details on the strategies for both data monitoring and interim analysis. The aim of this project is to investigate the forms of monitoring used in cancer clinical trials and in particular to gather information on the role of interim analyses in the data monitoring process of a clinical trial. This study focused on the prevalence of different types of interim analyses and data monitoring in cancer clinical trials. Methods Source of investigation were the protocols of cancer clinical trials included in the Italian registry of clinical trials from 2000 to 2005. Evaluation was restricted to protocols of randomised studies with a time to event endpoint, such as overall survival (OS or progression free survival (PFS. A template data extraction form was developed and tested in a pilot phase. Selection of relevant protocols and data extraction were performed independently by two evaluators, with differences in the data assessment resolved by consensus with a third reviewer, referring back to the original protocol. Information was obtained on a general characteristics of the protocol b disease localization and patient setting; c study design d interim analyses; e DSMC. Results The analysis of the collected protocols reveals that 70.7% of the protocols incorporate statistical interim analysis plans, but only 56% have also a DSMC and be considered adequately planned. The most concerning cases are related to lack of any form of monitoring (20.0% of the protocols, and the planning of interim analysis, without DSMC (14.7%. Conclusion The results indicate that there is still insufficient attention paid to the implementation of interim analysis.

  8. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  9. Status of environmental technology; Interim Report to the sector study 'Petroleum and Energy', the integrated management plan for North Sea. Mapping of available environmental technology; Statusrapport for miljoeteknologi

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    The purpose of this report is to provide an overview of the current status of environmental technology that may help to prevent and reduce / prevent environmental pollution. The report is a foundation report to the management plan for the North Sea. The report was prepared based on the NPD's knowledge and with good input from the PSA, and resource persons in the oil companies. The following is given a summary of the various disciplines and the technological challenges the industry has managed to meet and which ones remain. (Author)

  10. Interim endodontic therapy for alveolar socket bone regeneration of infected hopeless teeth prior to implant therapy.

    Science.gov (United States)

    Rass, Marwan Abou

    2010-01-01

    The immediate placement of implants in the fresh extraction sockets of infected teeth with periradicular and periapical lesions is contraindicated because of both the infection and the loss of architecture required for proper implant placement. There are 4 approaches for implant replacement of a hopeless tooth with lesions: (1) extraction and delayed implant placement; (2) extraction, debridement, guided bone regeneration (GBR), guided tissue regeneration (GTR), and delayed implant placement; (3) extraction, intrasocket debridement, and immediate implant placement; or (4) extraction, debridement, GBR, GTR, and simultaneous implant placement. The extraction of such hopeless teeth often results in large bone and soft tissue defects that are difficult to repair. This article introduces an alternative approach: interim endodontic implant site preparation, defined as a transitional, surgical, or nonsurgical endodontic treatment to regenerate the hopeless tooth bone defects and prepare the site for proper implant placement. This article describes 3 distinct interim endodontic protocols used to manage 5 patients, all of whom had severely infected hopeless teeth with large lesions and were treatment planned for implant replacement: the first, interim nonsurgical endodontic treatment to restore the normal anatomy of the infected hopeless tooth; the second, interim surgical endodontics on the hopeless tooth with preexisting endodontic treatment to regenerate apical bone for primary implant stability, thus avoiding the involvement of the maxillary sinus and other critical anatomic structures; and the third, interim surgical endodontics on the hopeless tooth with preexisting endodontic treatment to confine the size of the osseous defect and simplify the GBR and GTR procedures. The outcome of interim endodontic treatment on these 5 patients demonstrated that tooth extraction would have been a less predictable approach. The interim treatment changed the overall direction of the

  11. AES Water Architecture Study Interim Results

    Science.gov (United States)

    Sarguisingh, Miriam J.

    2012-01-01

    The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems in order to enable NASA human exploration missions beyond low earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near term missions beyond LEO. The secondary objective is to continue to advance mid-readiness level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near and long term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit environmental control and life support systems (ECLSS) definition. This study is being performed in three phases. Phase I of this study established the scope of the study through definition of the mission requirements and constraints, as well as indentifying all possible WRS configurations that meet the mission requirements. Phase II of this study focused on the near term space exploration objectives by establishing an ISS-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.

  12. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  13. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    level. This latter group of FEPs is also documented in the SR-Can version of the FEP database. The further processing of the initial state FEPs revealed that those FEPs that are not covered by the description of the repository design or by the site description, concern deviations from the intended initial state as a consequence of undetected mishaps, sabotage etc. These FEPs were propagated to the selection of scenarios. Relevant process FEPs from the audit were used to update the SR 97 set of internal processes for the engineered barrier system and the geosphere. The resulting SR-Can set of processes for the buffer are documented in the interim version of the SR-Can Process report and as process headings in the SR-Can interim version of the FEP database. Preliminary lists with SR-Can processes for the other system components are presently available in the interim version of the FEP database, but these lists will be further processed and documented in the final version of the SR-Can Process report. External FEPs from the audit were checked against the plans for managing these issues in SR-Can. Climate and large-scale geological FEPs were compared against the plans for modelling these phenomena and the handling of future human actions were compared to the handling in SR 97, which forms the basis for the handling in SR-Can. The coverage was found satisfactory. The results are not documented in the interim version of the SR-Can database, but will be so in the final version of the SR-Can database

  14. Process operational readiness and operational readiness follow-on

    International Nuclear Information System (INIS)

    Nertney, R.J.

    1992-11-01

    The first document in the System Safety Development Center (SSDC) series deals with the subject of Occupancy-Use Readiness. The material included in that manual provided the basis for development of the SSDC workshop in Operational Readiness. The original Occupancy Readiness Manual, however, deals only generally with the subject of process safety; i.e., the safety of overall ''processes'' such as solar collection systems, nuclear reactors, and coal fired electrical plants. The manual also fails to detail the considerations involved in maintaining the state of readiness on a continuing basis. Both of the latter subjects are dealt with in some detail in the SSDC's Operational Readiness Workshop. The purpose of this document is to provide additional documentary material dealing with subjects introduced in SSDC-1 Occupancy-Use Readiness Manual, and SSDC-12, Safety Considerations in Evaluation of Maintenance Programs. In augmenting SSDC-1, Part I of this manual provides additional material related to process safety; in the case of SSDC-12, the subject of safety considerations in evaluation of maintenance programs is broadened in Part II to include maintenance of personnel systems and procedural systems as well as hardware. ''Maintenance'' is related more directly to the concept of operational readiness and an alternative analytical tree is provided for hardware maintenance program evaluation

  15. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  16. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  17. 45 CFR 86.71 - Interim procedures.

    Science.gov (United States)

    2010-10-01

    ... SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Procedures [Interim... Music classes, [43]; 86.34(f) Physical education, [43, 56, 58]; Sex education, [43, 57]; 86.34(e.... 901, 902, Education Amendments of 1972, 86 Stat. 373, 374; 20 U.S.C. 1681, 1682) Pt. 86, Index Subject...

  18. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  19. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  20. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  1. 40 CFR 180.319 - Interim tolerances.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim tolerances. 180.319 Section 180.319 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS... Raw agricultural commodity Coordination product of zinc ion and maneb Fungicide 1.0 (Calculated as...

  2. Interim Prosthesis Options for Dental Implants.

    Science.gov (United States)

    Siadat, Hakimeh; Alikhasi, Marzieh; Beyabanaki, Elaheh

    2017-06-01

    Dental implants have become a popular treatment modality for replacing missing teeth. In this regard, the importance of restoring patients with function during the implant healing period has grown in recent decades. Esthetic concerns, especially in the anterior region of the maxilla, should also be considered until the definitive restoration is delivered. Another indication for such restorations is maintenance of the space required for esthetic and functional definitive restorations in cases where the implant site is surrounded by natural teeth. Numerous articles have described different types of interim prostheses and their fabrication techniques. This article aims to briefly discuss all types of implant-related interim prostheses by different classification including provisional timing (before implant placement, after implant placement in unloading and loading periods), materials, and techniques used for making the restorations, the type of interim prosthesis retention, and definitive restoration. Furthermore, the abutment torque for such restorations and methods for transferring the soft tissue from interim to definitive prostheses are addressed. © 2015 by the American College of Prosthodontists.

  3. M-Readiness Assessment Model Development and Validation: Investigation of Readiness Index and Factors Affecting Readiness

    Science.gov (United States)

    Bakhsh, Muhammad; Mahmood, Amjad; Sangi, Nazir Ahmed

    2018-01-01

    It is important for distance learning institutions to be well prepared before designing and implementing any new technology based learning system to justify the investment and minimize failure risk. It can be achieved by systematically assessing the readiness of all stakeholders. This paper first proposes an m-readiness assessment process and…

  4. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  5. Factors Affecting the Technology Readiness of Health Professionals

    Science.gov (United States)

    Myers, Stephanie E.

    2010-01-01

    Federal government policies are promoting diffusion of technologies into the healthcare system. If health professionals reject the new technologies planned for the healthcare system, it could result in costly failures, delays, and workforce problems. There is a lack of knowledge about factors that affect technology readiness (TR), defined as the…

  6. Assessing the readiness of contractors in implementing low carbon ...

    African Journals Online (AJOL)

    For the implementation of low carbon construction in our construction industry, the contractors need to be ready and have knowledge to adopt low carbon construction ... A checklist was established by summarizing the highest low carbon activities from each category which were sustainable site planning and management, ...

  7. Considerations for "Rebranding" Kindergarten Readiness Assessment. CEELO FastFact

    Science.gov (United States)

    Schilder, Diane; Dahlin, Melissa

    2014-01-01

    In February 2014, a state department of education contacted the Center on Enhancing Early Learning Outcomes (CEELO) for support in informing the rebranding of their kindergarten readiness assessment instrument. This state's department of education would like to develop a plan for increasing the use of the early childhood assessment system among…

  8. Zero Energy Ready Home Multifamily Case Study Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, Jordan [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States); Alaigh, Kunal [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States)

    2016-02-01

    Two multifamily buildings planned in Climate Zone 4 were analyzed to determine the cost, energy and performance implications of redesigning them to comply with Zero Energy Ready Home, a recognition program of the U.S. Department of Energy. Energy modeling was conducted on one representative apartment in each building using BEopt.

  9. Prediction of Pathological Complete Response to Neoadjuvant Chemotherapy for Primary Breast Cancer Comparing Interim Ultrasound, Shear Wave Elastography and MRI.

    Science.gov (United States)

    Evans, Andrew; Whelehan, Patsy; Thompson, Alastair; Purdie, Colin; Jordan, Lee; Macaskill, Jane; Waugh, Shelley; Fuller-Pace, Frances; Brauer, Katrin; Vinnicombe, Sarah

    2017-09-21

    Background  Prediction of pathological complete response (pCR) of primary breast cancer to neoadjuvant chemotherapy (NACT) may influence planned surgical approaches in the breast and axilla. The aim of this project is to assess the value of interim shear wave elastography (SWE), ultrasound (US) and magnetic resonance imaging (MRI) after 3 cycles in predicting pCR. Methods  64 patients receiving NACT had baseline and interim US, SWE and MRI examinations. The mean lesion stiffness at SWE, US and MRI diameter was measured at both time points. We compared four parameters with pCR status: a) Interim mean stiffness ≤ or > 50 kPa; b) Percentage stiffness reduction; c) Percentage US diameter reduction and d) Interim MRI response using RECIST criteria. The Chi square test was used to assess significance. Results  Interim stiffness of ≤ or > 50 kPa gave the best prediction of pCR with pCR seen in 10 of 14 (71 %) cancers with an interim stiffness of ≤ 50 kPa, compared to 7 of 50 (14 %) of cancers with an interim stiffness of > 50 kPa, (p  30 % (sensitivity 50 % and specificity 79 %, p = 0.03) and % reduction in US diameter (sensitivity 47 %, specificity 81 %, p = 0.03). Similar results were obtained from ROC analysis. Conclusion  SWE stiffness of breast cancers after 3 cycles of NACT and changes in stiffness from baseline are strongly associated with pCR after 6 cycles. © Georg Thieme Verlag KG Stuttgart · New York.

  10. Defense Readiness Reporting System: A Better Way to Measure Readiness?

    National Research Council Canada - National Science Library

    Dewey, John T

    2007-01-01

    ...) examines the Defense Readiness Report System (DRRS) to see if it (a) provides an objective assessment of capabilities to meet the mission priorities established by the Office of the Secretary of Defense (OSD) (b...

  11. Specialty Training's Organizational Readiness for curriculum Change (STORC): development of a questionnaire in a Delphi study

    NARCIS (Netherlands)

    Bank, L.; Jippes, M.; van Luijk, S.J.; den Rooyen, C.; Scherpbier, A.J.J.A.; Scheele, F.

    2015-01-01

    Abstract Background: In postgraduate medical education (PGME), programs have been restructured according to competency-based frameworks. The scale and implications of these adjustments justify a comprehensive implementation plan. Organizational Readiness for Change (ORC) is seen as a critical

  12. The Spanish general radioactive waste plan

    International Nuclear Information System (INIS)

    Redondo, J.M.

    2007-01-01

    The author summarized the current status of Spain's general radioactive waste management plan. This plan forms the basis for a national radioactive waste management policy and decommissioning strategy. It is updated periodically, the current 5. plan was approved in 1999. The most important element of the current strategy is the development of a centralized interim HLW storage facility by 2010. (A.L.B.)

  13. Climate Ready Estuaries

    Science.gov (United States)

    Information on climate change impacts to different estuary regions, tools and resources to monitor changes, and information to help managers develop adaptation plans for risk management of estuaries and coastal communities.

  14. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  15. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  16. Project SHARE - An interim report

    Science.gov (United States)

    Bouck, Gail P.; Stevenson, Jim; Gillick, David

    1987-05-01

    Project SHARE, a program sponsored jointly by the International Institute of Communications and Intersat, has been undertaken to foster telecommunications development in rural and remote areas of the world. Completed projects such as Teleeducation in the People's Republic of China and The American Society of Microbiology in Africa are discussed as well as projects currently in progress. Projects under active planning include Education in Pakistan through the Pakistan Space and Upper Atmosphere Research Commission and The Sky Channel of the Pacific.

  17. Our Greatest Natural Resource: Investing in the Future of Alaska's Children. A Report of the Governor's Interim Commission on Children and Youth.

    Science.gov (United States)

    Alaska Office of the Governor, Juneau.

    In 1987, the Governor of Alaska's Interim Commission on Children and Youth was given two tasks: (1) to develop a plan for a first-class child care system for working parents statewide that is workable, fair and sensibly integrates with the public schools; and (2) to produce a comprehensive plan to combat the problems facing Alaskans so they are…

  18. Checklist for clinical readiness published

    Science.gov (United States)

    Scientists from NCI, together with collaborators from outside academic centers, have developed a checklist of criteria to evaluate the readiness of complex molecular tests that will guide decisions made during clinical trials. The checklist focuses on tes

  19. LHCf: ready to go

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    Reinstalled in the tunnel at the end of 2014, the two detectors of the LHCf experiment are now ready for operation. The first data should be taken in May.   LHCf’s Arm1 detector. The Large Hadron Collider forward (LHCf) experiment measures neutral particles emitted at nearly zero degrees from the proton beam direction. Because these "very forward" particles carry a large fraction of the collision energy, they are important for understanding the development of atmospheric air-shower phenomena produced by high-energy cosmic rays. To measure these particles, two detectors, Arm1 and Arm2, sit along the LHC beamline, at 140 metres either side of the ATLAS collision point. In July 2010, after a 9-month operation, the LHCf collaboration removed the two detectors from the tunnel to avoid severe radiation damage. The Arm2 detector was reinstalled in the tunnel for data-taking with proton–lead collisions in 2013, while Arm1 was being upgraded to be a radiation-ha...

  20. Can NATO's new Very High Readiness Joint Task Force deter?

    DEFF Research Database (Denmark)

    Rynning, Sten; Ringsmose, Jens

    2017-01-01

    ” a distinct strategic rival – Russia. Chief among the Welsh summit initiatives was the decision to set up a new multinational spearhead force – the Very High Readiness Joint Task Force (VJTF) – as part of an enhanced NATO Response Force (NRF) and within the framework of a so-called Readiness Action Plan (RAP...... requires a proper doctrine that pulls the capacities credible together and then a culture of decision-making and communication that establishes NATO’s reputation for resolve....

  1. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  2. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  3. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  4. Spent Fuel Long Term Interim Storage: The Spanish Policy

    International Nuclear Information System (INIS)

    Fernandez-Lopez, Javier

    2014-01-01

    ENRESA is the Spanish organization responsible for long-term management of all categories of radioactive waste and nuclear spent fuel and for decommissioning nuclear installations. It is also in charge of the management of the funds collected from waste producers and electricity consumers. The national policy about radioactive waste management is established at the General Radioactive Waste Plan by the Government upon proposal of the Ministry of Industry, Energy and Tourism. Now the Plan in force is the Sixth Plan approved in 2006. The policy on spent nuclear fuel, after description of the current available options, is set up as a long term interim storage at a Centralized Temporary Storage facility (CTS, or ATC in Spanish acronym) followed by geologic disposal, pending technological development on other options being eligible in the future. After a site selection process launched in 2009, the site for the ATC has been chosen at the end of 2011. The first steps for the implementation of the facility are described in the present paper. (authors)

  5. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  6. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  7. Nurses’ perspectives on readiness of organizations for change: a comparative study

    Directory of Open Access Journals (Sweden)

    Amarneh BH

    2017-04-01

    Full Text Available Basil Hameed Amarneh Department of Psychiatric and Community Health Nursing, Faculty of Nursing, Jordan University of Science and Technology, Irbid, Jordan Purpose: The purpose of this study is to evaluate readiness for change perceived by nurses at Jordanian hospitals according to the hospital type and the gender of nurse.Background: There are misconceptions about readiness for change, and only a few health care and nursing studies about organizational readiness for change have been conducted. Nurses’ perceptions of their organizations’ readiness for change are important; they help in introducing, managing, and maintaining the change.Methods: Using a quantitative comparative research design and a validated survey, data were collected in 2010 from a convenience sample of 130 nurses from four government and three private hospitals with a response rate of 59%.Results: There are some issues in Jordanian hospitals, which show that change has to be managed well. Nurses in government hospitals and female nurses perceived their hospitals to be more ready for change, compared with those in private hospitals and male nurses.Conclusion: Government hospitals were more ready to change than private hospitals, particularly in supporting collaborative and multidisciplinary team approaches to patient care. More than male nurses, female nurses perceived that their organizations were ready to use or plan to use advanced practice nurses. One of the recommendations is a need for targeted intervention to improve readiness for change. Keywords: readiness for change, organizations, hospitals, nurses, Jordan

  8. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  9. Software Configuration Management Plan for the Sodium Removal System

    Energy Technology Data Exchange (ETDEWEB)

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  10. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  11. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  12. Factors of children's school readiness

    Directory of Open Access Journals (Sweden)

    Ljubica Marjanovič Umek

    2006-12-01

    Full Text Available The purpose of the study was to examine the effect of preschool on children's school readiness in connection with their intellectual abilities, language competence, and parents' education. The sample included 219 children who were 68 to 83 months old and were attending the first year of primary school. Children were differentiated by whether or not they had attended preschool before starting school. Children's intellectual ability was determined using Raven's Coloured Progressive Matrices (CPM; Raven, Raven, & Court, 1999, language competence using the Lestvice splošnega govornegarazvoja–LJ (LSGR–LJ, Scales of General Language Development; Marjanovič Umek, Kranjc, Fekonja in Bajc, 2004, and school readiness with the Preizkus pripravljenosti za šolo (PPŠ, Test of School Readiness; Toličič, 1986. The results indicate that children's intellectual ability and language competence have a high predictive value for the school readiness — they explained 51% of the variance in children's scores on the PPŠ. Preschool enrollment has a positive effect on school readiness for children whose parents have a low level of education, but not for those whose parents are highly educated.

  13. Waste Encapsulation and Storage Facility (WESF) Design Reconstitution Plan

    International Nuclear Information System (INIS)

    HERNANDEZ, R.

    1999-01-01

    The purpose of Design Reconstitution is to establish a Design Baseline appropriate to the current facility mission. The scope of this plan is to ensure that Systems, Structures and Components (SSC) identified in the WESF Basis for Interim Operation (HNF-SDWM-BIO-002) are adequately described and documented, in order to support facility operations. In addition the plan addresses the adequacy of selected Design Topics which are also crucial for support of the facility Basis for Interim Operation (BIO)

  14. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  15. Design criteria for the 200-ZP-1 interim remedial measure

    International Nuclear Information System (INIS)

    Mudge, J.F.; Olson, J.W.

    1995-08-01

    The Interim Remedial Measure Proposed Plan for the 200-ZP-1 Operable Unit recommended a pump and treat action to contain contaminated groundwater and limit further degradation of groundwater due to elevated concentrations of carbon tetrachloride, chloroform, and trichloroethylene in the 200-ZP-1 Operable Unit. This design criteria document defines the Project. The Project encompasses: site preparation; development of groundwater wells for monitoring, extraction, and injection; extraction and injection equipment; construction of a treatment system with support buildings/utilities; management; engineering design, analysis, and reporting; and operation and maintenance. A groundwater pump and treat system, hereafter the System, will be composed of extraction wells, a piping network, treatment equipment, water storage, and injection wells. Based upon engineering judgment, the selected technology in the proposed plan (DOE-RL 1994a) is air stripping of the organic contaminants followed by vapor-phase adsorption onto granulated activated carbon (GAC); liquid-phase GAC may be required as a polishing step. The Treatment Equipment refers to air stripping towers, adsorption vessels, water pumps, air blowers, instrumentation, and control devices which will be procured as a turn-key system

  16. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    Science.gov (United States)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  17. Coverage of certain preventive services under the Affordable Care Act. Interim final rules.

    Science.gov (United States)

    2014-08-27

    This document contains interim final regulations regarding coverage of certain preventive services under section 2713 of the Public Health Service Act (PHS Act), added by the Patient Protection and Affordable Care Act, as amended, and incorporated into the Employee Retirement Income Security Act of 1974 and the Internal Revenue Code. Section 2713 of the PHS Act requires coverage without cost sharing of certain preventive health services by non-grandfathered group health plans and health insurance coverage. Among these services are women's preventive health services, as specified in guidelines supported by the Health Resources and Services Administration (HRSA). As authorized by the current regulations, and consistent with the HRSA Guidelines, group health plans established or maintained by certain religious employers (and group health insurance coverage provided in connection with such plans) are exempt from the otherwise applicable requirement to cover certain contraceptive services. Additionally, under current regulations, accommodations are available with respect to the contraceptive coverage requirement for group health plans established or maintained by eligible organizations (and group health insurance coverage provided in connection with such plans), and student health insurance coverage arranged by eligible organizations that are institutions of higher education, that effectively exempt them from this requirement. The regulations establish a mechanism for separately furnishing payments for contraceptive services on behalf of participants and beneficiaries of the group health plans of eligible organizations that avail themselves of an accommodation, and enrollees and dependents of student health coverage arranged by eligible organizations that are institutions of higher education that avail themselves of an accommodation. These interim final regulations augment current regulations in light of the Supreme Court's interim order in connection with an

  18. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of proposed rulemaking (NPRM). SUMMARY: We reimburse States that provide interim assistance to Supplemental...

  19. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  20. 28 CFR 94.41 - Interim emergency payment.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  1. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  2. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  3. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  4. First interim examination of defected BWR and PWR rods tested in unlimited air at 2290C

    International Nuclear Information System (INIS)

    Einziger, R.E.; Cook, J.A.

    1983-01-01

    A five-year whole rod test was initiated to investigate the long-term stability of spent fuel rods under a variety of possible dry storage conditions. Both PWR and BWR rods were included in the test. The first interim examination was conducted after three months of testing to determine if there was any degradation in those defected rods stored in an unlimited air atmosphere. Visual observations, diametral measurements and radiographic smears were used to assess the degree of cladding deformation and particulate dispersal. The PWR rod showed no measurable change from the pre-test condition. The two original artificial defects had not changed in appearance and there was no diametral growth of the cladding. One of the defects in BWR rod showed significant deformation. There was approximately 10% cladding strain at the defect site and a small axial crack had formed. The fuel in the defect did not appear to be friable. The second defect showed no visible change and no cladding strain. Following examination, the test was continued at 230 0 C. Another interim examination is planned during the summer of 1983. This paper discusses the details and meaning of the data from the first interim examination

  5. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    Science.gov (United States)

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  6. Ready to crown

    LENUS (Irish Health Repository)

    McReynolds, David

    2017-04-01

    When multiple teeth or localised segments of the mouth require crowns, the restorative interventions involved can be psychologically and physically demanding for the operator, patient and dental technician alike.1,2 It is important that all parties involved in restorations of this nature hold a shared understanding of the expected outcome of treatment, with a realistic, common end goal in mind right from the very beginning. Such clarity of thought and communication is key to avoiding biological, mechanical and aesthetic failures in the planning and execution of advanced restorative treatments. Biomechanically stable and aesthetically pleasing provisional restorations are an essential aspect of treatment, which allow teeth to be prepared and provisionalised over multiple appointments within the comfort zone of the operator and patient.3

  7. A theory of organizational readiness for change

    OpenAIRE

    Weiner Bryan J

    2009-01-01

    Abstract Background Change management experts have emphasized the importance of establishing organizational readiness for change and recommended various strategies for creating it. Although the advice seems reasonable, the scientific basis for it is limited. Unlike individual readiness for change, organizational readiness for change has not been subject to extensive theoretical development or empirical study. In this article, I conceptually define organizational readiness for change and devel...

  8. 50 CFR 259.30 - Application for Interim Capital Construction Fund Agreement (“Interim CCF Agreement”).

    Science.gov (United States)

    2010-10-01

    ...) Date of construction, acquisition, or reconstruction, (vii) Fishery of operation (which in this section... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Application for Interim Capital Construction Fund Agreement (âInterim CCF Agreementâ). 259.30 Section 259.30 Wildlife and Fisheries NATIONAL...

  9. Reading Fluency and College Readiness

    Science.gov (United States)

    Rasinski, Timothy V.; Chang, Shu-Ching; Edmondson, Elizabeth; Nageldinger, James; Nigh, Jennifer; Remark, Linda; Kenney, Kristen Srsen; Walsh-Moorman, Elizabeth; Yildirim, Kasim; Nichols, William Dee; Paige, David D.; Rupley, William H.

    2017-01-01

    The Common Core State Standards suggest that an appropriate goal for secondary education is college and career readiness. Previous research has identified reading fluency as a critical component for proficient reading. One component of fluency is word recognition accuracy and automaticity. The present study attempted to determine the word…

  10. Onderzoek online readiness modezaken 2012

    NARCIS (Netherlands)

    Boels, Han; Weltevreden, Jesse

    2013-01-01

    In dit onderzoek is de online readiness van modezaken in 2012 in kaart gebracht. In totaal hebben 124 (voornamelijk zelfstandige) modezaken deelgenomen aan het onderzoek. Het onderzoek is uitgevoerd door het lectoraat Online Ondernemen samen met studenten van de minor Marketing Tomorrow van de

  11. Onderzoek online readiness rijscholen 2013

    NARCIS (Netherlands)

    Weltevreden, Jesse; Boels, Han

    2013-01-01

    In dit onderzoek is de online readiness van rijscholen in 2013 in kaart gebracht. In totaal hebben 115 rijscholen deelgenomen aan het onderzoek. Het onderzoek is uitgevoerd door het lectoraat Online Ondernemen samen met studenten van de minor Marketing Tomorrow van de Hogeschool van Amsterdam.

  12. Safe, Healthy and Ready to Succeed: Arizona School Readiness Key Performance Indicators

    Science.gov (United States)

    Migliore, Donna E.

    2006-01-01

    "Safe, Healthy and Ready to Succeed: Arizona School Readiness Key Performance Indicators" presents a set of baseline measurements that gauge how well a statewide system of school readiness supports is addressing issues that affect Arizona children's readiness for school. The Key Performance Indicators (KPIs) measure the system, rather…

  13. Solar Ready: An Overview of Implementation Practices

    Energy Technology Data Exchange (ETDEWEB)

    Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

    2012-01-01

    This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

  14. Interim Storage of Spent Nuclear Fuel before Final Disposal in Germany - Regulator's view

    International Nuclear Information System (INIS)

    Arens, G.; Goetz, Ch.; Geupel, Sandra; Gmal, B.; Mester, W.

    2014-01-01

    For spent nuclear fuel management in Germany the concept of dry interim storage in dual purpose casks before direct disposal is applied. The Federal Office for Radiation Protection (BfS) is the competent authority for licensing of interim storage facilities. The competent authority for surveillance of operation is the responsible authority of the respective federal state (Land). Currently operation licenses for storage facilities have been granted for a storage time of 40 years and are based on safety demonstrations for all safety issues as safe enclosure, shielding, sub-criticality and decay heat removal under consideration of operation conditions. In addition, transportability of the casks for the whole storage period has to be provided. Due to current delay in site selection and exploration of a disposal site, an extension of the storage time beyond 40 years could be needed. This will cause appropriate actions by the licensee and the competent authorities as well. A brief description of the regulatory base of licensing and surveillance of interim storage is given from the regulators view. Furthermore the current planning for final disposal of spent nuclear fuel and high level waste and its interconnections between storage and disposal concepts are shortly explained. Finally the relevant aspects for licensing of extended storage time beyond 40 years will be discussed. Current activities on this issue, which have been initiated by the Federal Government, will be addressed. On the regulatory side a review and amendment of the safety guideline for interim storage of spent fuel has been performed and the procedure of periodic safety review is being implemented. A guideline for implementing an ageing management programme is available in a draft version. Regarding safety of long term storage a study focussing on the identification and evaluation of long term effects as well as gaps of knowledge has been finished in 2010. A continuation and update is currently underway

  15. Nigerian CSM project ready to roll.

    Science.gov (United States)

    1985-01-01

    Nigeria's contraceptive social marketing (CSM) project is ready to be launched. Population Services Intenational (PSI) had completed the groundwork for the project, funded primarily by a $200,000 grant from the nonpofit D.K. Tyagi Fund. The Population Crisis Committee also provided support for the new project. At presstime, PSI was negotiating for continued project funding from the US Agency for International Development (USAID) and The Futures Group. PSI already has identified suitable products, researched brand names, arranged for distribution, appointed an advertising agency, designed packaging, written a marketing plan, and taken steps to create a local, nonprofit marketing organization to manage the project. PSI has named Tim Barton as the resident manager. He will take up his post once the issue of future funding is resolved. Contraceptives now available are distributed through the private sector and by the Planned Parenthood Federation of Nigeria, the Local International Planned Parenthood Federation affiliate. Nigeria's annual rate of population growth is about 3% and the country is urbanizing rapidly. A 1983 fertility report revealed that only 14% of Nigerian women had ever used any type of contraception; 6% of married women were using a contraceptive method at the time of the survey.

  16. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.

    1998-01-07

    This memorandum provides a summary of PHMC [Project Hanford Management Contract] team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to-proceed, a summary of the PHMC team readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  17. Lean Six Sigma Analysis of Shipboard Audit Readiness on a U.S. Navy Destroyer

    Science.gov (United States)

    2016-12-01

    In anticipation of the Department of Defense (DOD) audit , each of the services have started a set of Financial Improvement Audit Readiness (FIAR...Improvement and Audit Readiness (FIAR) Plan, which mandates that military services and defense agencies correct financial management deficiencies...from LOGCOP. If all documents pass quality assurance checks, the KSDs are forwarded back to FMO via the Audit Response Center (ARC) tool.10 The KSD

  18. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    International Nuclear Information System (INIS)

    Jordan, K.N.

    1998-01-01

    This memorandum provides a summary of PHMC (Project Hanford Management Contract) team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to proceed, a summary of the PHMC readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team's component of the Phase 1 Mission

  19. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, K.N.

    1998-01-09

    This memorandum provides a summary of PHMC (Project Hanford Management Contract) team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to proceed, a summary of the PHMC readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  20. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  1. ReadyVax: A new mobile vaccine information app.

    Science.gov (United States)

    Bednarczyk, Robert A; Frew, Paula M; Salmon, Daniel A; Whitney, Ellen; Omer, Saad B

    2017-05-04

    Vaccine information of varying quality is available through many different sources. We describe the creation, release and utilization of ReadyVax, a new mobile smartphone app providing access to trustworthy, evidence-based vaccine information for a target audience of healthcare providers, pharmacists, and patients (including parents of children). We describe the information content and technical development of ReadyVax. Between the hard launch of the app on February 12, 2015 and October 8, 2016, the app has been downloaded by 5,142 unique users, with 6,841 total app sessions initiated, comprising a total of 15,491 screen views (2.3 screens/session on average). ReadyVax has been downloaded by users in 102 different countries; most users (52%) are from the United States. We are continuing outreach efforts to increase app use, and planning for development of an Android-compatible version of ReadyVax, to increase the available market for the app.

  2. Recycling readiness of advanced batteries for electric vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Jungst, R.G.

    1997-09-01

    Maximizing the reclamation/recycle of electric-vehicle (EV) batteries is considered to be essential for the successful commercialization of this technology. Since the early 1990s, the US Department of Energy has sponsored the ad hoc advanced battery readiness working group to review this and other possible barriers to the widespread use of EVs, such as battery shipping and in-vehicle safety. Regulation is currently the main force for growth in EV numbers and projections for the states that have zero-emission vehicle (ZEV) programs indicate about 200,000 of these vehicles would be offered to the public in 2003 to meet those requirements. The ad hoc Advanced Battery Readiness Working Group has identified a matrix of battery technologies that could see use in EVs and has been tracking the state of readiness of recycling processes for each of them. Lead-acid, nickel/metal hydride, and lithium-ion are the three EV battery technologies proposed by the major automotive manufacturers affected by ZEV requirements. Recycling approaches for the two advanced battery systems on this list are partly defined, but could be modified to recover more value from end-of-life batteries. The processes being used or planned to treat these batteries are reviewed, as well as those being considered for other longer-term technologies in the battery recycling readiness matrix. Development efforts needed to prepare for recycling the batteries from a much larger EV population than exists today are identified.

  3. Ropinirole in the treatment of early Parkinson's disease : A 6-month interim report of a 5-year levodopa-controlled study

    NARCIS (Netherlands)

    Poewe, WH; Rascol, O; Brooks, DJ; Brunt, ER; Korczyn, AD; Stocchi, F

    The efficacies of ropinirole and levodopa were compared after 6 months of treatment in a planned interim analysis of a 5-year, double-blind, randomized, multicenter study of patients with early Parkinson's disease requiring dopaminergic therapy. The percentage of improvement in the Unified

  4. Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tartakovsky, Guzel D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Timothy C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chronister, Glen B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-01

    A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

  5. Expansion of storage capacity of interim spent fuel storage (MSVP) Bohunice

    International Nuclear Information System (INIS)

    Pilat, P.; Fridrich, V.

    2005-01-01

    This article describes modifications of Interim spent fuel storage, performed with aim of storage capacity expansion, seismic stability enhancement, and overall increase of service life as well as assuring of MSVP safe operation. Uniqueness of adopted technical solutions is based upon the fact that mentioned innovations and modifications were performed without any changes, neither in ground plan nor architecture of MSVP structure. It also important to mention that all modifications were performed during continual operation of MSVP without any breaks of limits or operational regulations. Reconstruction and innovation of existing construction and technological systems of MSVP has assured required quality standard comparable with actual trends. (authors)

  6. Conceptual design of interim storage facility for CNAI

    International Nuclear Information System (INIS)

    Fuenzalida Troyano, Carlos S.; Bergallo, Juan E.; Nassini, Horacio E.P.; Blanco, Anibal; Delmastro, Dario F.

    2007-01-01

    The reduced storage capacity available in the two spent fuel pools of argentine PHWR Atucha-1 power plant, the current plans for extending the reactor operation beyond its design lifetime, and the government decision on Atucha-2 NPP construction ending, have motivated the evaluation of a dry storage option for the interim management of spent fuel assemblies. Two different designs are presently being analyzed by an expert working group, from both technical and economical points of views. Authors are proposing a modular system consisting of an arrangement of reinforced concrete structures into which welded metallic canisters loaded with 37 spent fuel assemblies each stored in horizontal position. The reinforced concrete module is designed to provide the necessary physical protection and biological shielding to the loaded canisters during long-term storage, as well as passive means to remove the spent fuel decay heat by a combination of radiation, conduction and natural air convection. In this works are presented advances in the conceptual designs for a spent nuclear fuel system to Atucha I nuclear power plant. (author) [es

  7. Eos Interviews Robert Van Hook, Former AGU Interim Executive Director

    Science.gov (United States)

    Showstack, Randy

    2010-08-01

    Robert Van Hook, who served as AGU's interim executive director since January 2009, led the organization during a transition period that began with the retirement of long-serving executive director A. F. (“Fred”) Spilhaus Jr. Van Hook's tenure concluded on 30 August when Christine McEntee assumed her position as AGU's new executive director (see Eos, 91(17), 153, 156, 2010). During his tenure at AGU, which overlapped with a global economic recession, Van Hook helped to guide the organization through key structural governance changes, strategic planning, and upgrades in technology, human resources, and accounting. He also helped to revitalize public outreach and member services, among many other efforts. Van Hook, president of Transition Management Consulting, recently reflected upon his tenure, the transition period, and the future of AGU. Van Hook credits AGU's strong volunteer leadership—including past presidents Tim Killeen and Tim Grove, current president Mike McPhaden, and president-elect Carol Finn—for courage in moving the organization through a successful transition. “They were the ones who shoved the boat off from the shore. I was lucky enough to be invited into the boat,” he said. He also credits the staff for their resiliency and commitment to supporting AGU's science.

  8. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  9. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  10. Interim main report of the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Hedin, Allan

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10 -6 for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection in chapter 8. Hydrogeological

  11. Interim main report of the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Allan (ed.) [and others

    2004-08-01

    This document is an interim report on the safety assessment SR-Can (SR in the acronym stands for Safety Report and Can is short for canister). The final SR-Can report will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of the present interim report is to demonstrate the methodology for safety assessment so that it can be reviewed before it is used in a license application. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. Preliminary data from the Forsmark site, presently being investigated by SKB as one of the candidate for a KBS-3 repository are used to some extent as examples. However, the collected data are yet too sparse to allow an evaluation of safety for this site. An important aim of this report is to demonstrate the proper handling of requirements on the safety assessment in applicable regulations. Therefore, regulations issued by the Swedish Nuclear Power Inspectorate and the Swedish Radiation Protection Authority are duplicated in an Appendix. The principal acceptance criterion requires that 'the annual risk of harmful effects after closure does not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk'. 'Harmful effects' refer to cancer and hereditary effects. Following the introductory chapter 1, this report outlines the methodology for the SR-Can assessment in chapter 2, and presents in chapters 3, 4 and 5 the initial state of the system and the plans and methods for handling external influences and internal processes, respectively. Function indicators are introduced in chapter 6 and a preliminary evaluation of these is given in chapter 7. The material presented in the first seven chapters is utilised in the scenario selection

  12. Maglev ready for prime time.

    Energy Technology Data Exchange (ETDEWEB)

    Rote, D. M.; Johnson, L. R.; Energy Systems

    2003-01-01

    Putting Maglev on Track' (Issues, Spring 1990) observed that growing airline traffic and associated delays were already significant and predicted that they would worsen. The article argued that a 300-mile-per-hour (mph) magnetic levitation (maglev) system integrated into airport and airline operations could be a part of the solution. Maglev was not ready for prime time in 1990, but it is now.

  13. REDD+ Readiness progress across countries

    OpenAIRE

    Minang, P.A.; Noordwijk, van, M.; Duguma, L.A.; Alemagi, D.; Do, T.H.; Bernard, F.; Agung, P.; Robiglio, V.; Catacutan, D.

    2014-01-01

    Efforts towards Reducing Emissions from Deforestation and Forest Degradation plus conservation, sustainable management of forests and enhancement of carbon stocks (REDD+) have grown in importance in developing countries following negotiations within the United Nations Framework Convention on Climate Change (UNFCCC). This has favoured investments in processes to prepare countries for REDD+ at the national level (a process referred to as REDD+ Readiness). Yet, little attention has been given to...

  14. GRENADA. Renewables Readiness Assessment 2012

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    Grenada, like many Caribbean islands, is dependent on costly oil imports for its energy needs, including the generation of electricity. The transition to renewable energy could potentially support price reductions and improve the overall competitiveness of key sectors of the economy, particularly tourism. This report provides facts and analysis to support the country's discussion on ways to move forward with the renewable energy agenda. IRENA is ready to provide support in the implementation of the actions identified in this report.

  15. The design and application of an e-health readiness assessment tool.

    Science.gov (United States)

    Gholamhosseini, Leila; Ayatollahi, Haleh

    2017-01-01

    To date, several models have been developed to evaluate e-health readiness in healthcare organisations; however, no specific tool has been designed to assess or measure e-health readiness. The aim of this research was to design an e-health readiness assessment tool and to apply this tool to two Iranian hospitals to assess their readiness for the implementation of e-health. The study, which was undertaken in 2012, consisted of three phases: (i) review of existing models of e-health; (ii) design of an e-health readiness assessment tool; and (iii) trial of the assessment tool in two Iranian hospitals. Phase 1 consisted of a literature review that informed the development of the tool. In phase 2, we developed an e-health readiness assessment tool with feedback using two questionnaires from 40 employees from two teaching hospitals in Iran. In phase 3, we applied the tool to the same two Iranian teaching hospitals. Participants who completed the questionnaires were from management, health information technology, medical and nursing backgrounds and were familiar with e-health. A purposive sampling method was used to invite them to take part in the study. Data from the questionnaires were analysed using factor analysis and descriptive statistics. Five dimensions and twenty-one indices were selected to be included in the e-health readiness tool. The 5 dimensions and their relative importance were e-health readiness (16%), information and communication technology (ICT) functions (15%), environmental readiness (20%), human resources readiness (29%) and ICT readiness (20%). The total e-health readiness scores for hospital A and hospital B were 0.22 and 0.4, respectively (a score of 1 is the ideal). It is important to assess the e-health readiness of hospitals to save time and money and be able to better prepare for ICT implementations. The e-health readiness assessment tool provides a relatively simple method for assessing hospitals and provides essential information to assist

  16. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  17. Hospitals’ Readiness to Implement Clinical Governance

    Directory of Open Access Journals (Sweden)

    Farbod Ebadi Fardazar

    2015-02-01

    Full Text Available Background Quality of health services is one of the most important factors for delivery of these services. Regarding the importance and vital role of quality in the health sector, a concept known as “Clinical Governance” (CG has been introduced into the health area which aims to enhance quality of health services. Thus, this study aimed to assess private and public hospitals’ readiness to implement CG in Iran. Methods This descriptive and cross-sectional study was carried out in 2012. Four hundred thirty participants including doctors, nurses, diagnostic departments personnel, and support staff were chosen randomly from four hospitals (equally divided into private and public hospitals. Clinical Governance Climate Questionnaire (CGCQ was used for data collection. Finally, data were entered into the SPSS 18 and were analyzed using statistical methods. Results Among the CG dimensions, “organizational learning” and “planned and integrated quality improvement program” scored the highest and the lowest respectively for both types of hospitals. Hospitals demonstrated the worst condition with regard to the latter dimension. Furthermore, both types of hospitals had positive picture regarding “training and development opportunities”. Private hospitals scored better than public ones in all dimensions but there was only a significant difference in “proactive risk management” dimension between both types of hospitals (P< 0.05. Conclusion Hospitals’ readiness for CG implementation was “average or weak”. In order to implement CG successfully, it is essential to have a quality-centered culture, a culture specified by less paperwork, more selfsufficiency, and flexibility in hospitals’ affairs as well as centring on shared vision and goals with an emphasis on continuous improvement and innovation.

  18. Irradiation of ready meals for microbial safety and shelf-life extension: 1. microbial quality of waakye and other other ready-to-eat meals

    International Nuclear Information System (INIS)

    Nketsia-Tabiri, J.; Adu-Gyamfi, A.; Owusu-Biney, A.

    2006-01-01

    Waakye bought from the open market and 14 meals prepared under the hazard analysis and critical control point (HACCP) plan were microbiologically investigated. The aerobic mesophilic count (AMC) (10 7 - 10 8 CFU g 1 ) and coliform count (10 6 - 10 7 CFU g -1 ) for complete waakye meals, including macaroni, fried fish, sauce and vegetable salad, exceeded the microbiological standards for such ready-to-eat meals. The AMC (10 1 - 10 4 CFU g 1 ) and coliform count (10 1 - 10 2 CFU g -1 ) for all the ready meals prepared under HACCP and stored (-5 to 0 0 C) for up to 5 days were within the standards. Potential pathogens isolated from waakye and the meals prepared under HACCP plan included Escherichia coli, Klebsiella spp., Serratia spp., and Enterobacter spp. Subsequent studies will exploit the potential of irradiation to eliminate pathogens and ensure the microbiological safety of ready-to-eat meals. (au)

  19. Evidence based practice readiness: A concept analysis.

    Science.gov (United States)

    Schaefer, Jessica D; Welton, John M

    2018-01-15

    To analyse and define the concept "evidence based practice readiness" in nurses. Evidence based practice readiness is a term commonly used in health literature, but without a clear understanding of what readiness means. Concept analysis is needed to define the meaning of evidence based practice readiness. A concept analysis was conducted using Walker and Avant's method to clarify the defining attributes of evidence based practice readiness as well as antecedents and consequences. A Boolean search of PubMed and Cumulative Index for Nursing and Allied Health Literature was conducted and limited to those published after the year 2000. Eleven articles met the inclusion criteria for this analysis. Evidence based practice readiness incorporates personal and organisational readiness. Antecedents include the ability to recognize the need for evidence based practice, ability to access and interpret evidence based practice, and a supportive environment. The concept analysis demonstrates the complexity of the concept and its implications for nursing practice. The four pillars of evidence based practice readiness: nursing, training, equipping and leadership support are necessary to achieve evidence based practice readiness. Nurse managers are in the position to address all elements of evidence based practice readiness. Creating an environment that fosters evidence based practice can improve patient outcomes, decreased health care cost, increase nurses' job satisfaction and decrease nursing turnover. © 2018 John Wiley & Sons Ltd.

  20. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  1. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  2. Computerization of material test data reporting system : interim report.

    Science.gov (United States)

    1973-09-01

    This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...

  3. 14 CFR 136.41 - Interim operating authority.

    Science.gov (United States)

    2010-01-01

    ... tribal lands. (2) ATMP limitation. The Administrator may grant interim operating authority under this paragraph (c) only if the ATMP for the park or tribal lands to which the application relates has not been...

  4. TANK FARM INTERIM SURFACE BARRIER MATERIALS AND RUNOFF ALTERNATIVES STUDY

    Energy Technology Data Exchange (ETDEWEB)

    HOLM MJ

    2009-06-25

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  5. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  6. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  7. Export Readiness Assessment of Ten Iranian Pharmaceutical Companies and Comparison with their Export Performance

    Directory of Open Access Journals (Sweden)

    Mehdi Mohammadzadeh, Mohammad Poloee, Tayebeh Ghari

    2016-09-01

    Full Text Available Background: In the area of exporting, in developing countries, including Iran, the concept of export readiness is unknown to many decision makers and field of activity of Iranian pharmaceutical companies have been limited to the domestic market. Therefore, the main objective of this study is to compare the export performance of ten Iranian pharmaceutical companies with their export readiness. Methods: In order to do this, the top ten of Iranian pharmaceutical companies were selected as the sample. The companies' export readiness was measured, and compared with their export volume as well as their export growth (as two factors for determining the export performance in five years, to practically check the model and find the strengths and weaknesses of these Iranian pharmaceutical companies in the export factors. Results: Base on the results of the study, the export readiness of these companies does not have significant correlation with companies' export volume in the current circumstances, but it can predict the export growth in the firm's export rate with 95% certainty. Conclusion: The most important thing is that according to the data collected in our study, most of these ten Iranian pharmaceutical companies are not ready to attend in exporting and international markets and only two companies were ready to export. It seems that making improvement in some variables like obtaining international standards, marketing and exporting education, having a transparent and documented plan and having the responsible person for export could increase export readiness of pharmaceutical companies.

  8. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  9. Interim Safety Basis for Fuel Supply Shutdown Facility

    Energy Technology Data Exchange (ETDEWEB)

    BENECKE, M.W.

    2000-09-07

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.

  10. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  11. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  12. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  13. The information content of SFAS No 131 interim segment reporting

    OpenAIRE

    Joong-Seok Cho

    2010-01-01

    This study empirically investigates the effect of implementation of SFAS No.131 on companies' information environments by assessing the effect of interim period financial reports. Especially, using Beaver's information content measures, it investigates the market's reaction to interim period financial reporting under SFAS No.131. The empirical results of the information content test show that the adoption of SFAS No.131 does not affect the market's reaction. For the volume reaction test, no d...

  14. SaludABLEOmaha: improving readiness to address obesity through healthy lifestyle in a Midwestern Latino community, 2011-2013.

    Science.gov (United States)

    Frerichs, Leah; Brittin, Jeri; Robbins, Regina; Steenson, Sharalyn; Stewart, Catherine; Fisher, Christopher; Huang, Terry T-K

    2015-02-12

    A community's readiness for change is a precursor to the effective application of evidence-based practices for health promotion. Research is lacking regarding potential strategies to improve readiness to address obesity-related health issues in underserved communities. This case study describes SaludABLEOmaha, an initiative to increase readiness of residents in a Midwestern Latino community to address obesity and adopt healthy lifestyles. SaludABLEOmaha emphasized 2 core approaches, youth activism and collaboration among public and private institutions, which we applied to planning and implementing tactics in support of 3 interconnected strategies: 1) social marketing and social media, 2) service learning in schools (ie, curricula that integrate hands-on community service with instruction and reflection), and 3) community and business engagement. Following the Community Readiness Model protocol (http://triethniccenter.colostate.edu/communityReadiness.htm), structured interviews were conducted with community leaders and analyzed before and 2.5 years after launch of the program. The community increased in readiness from stage 3 of the Community Readiness Model, "vague awareness," at baseline to stage 5, "preparation," at follow-up. SaludABLEOmaha improved community readiness (eg, community knowledge, community climate), which probably contributed to the observed increase in readiness to address obesity through healthy lifestyle. Community mobilization approaches such as youth activism integrated with social marketing and social media tactics can improve community responsiveness to obesity prevention and diminish health disparities.

  15. SaludABLEOmaha: Improving Readiness to Address Obesity Through Healthy Lifestyle in a Midwestern Latino Community, 2011–2013

    Science.gov (United States)

    Frerichs, Leah; Brittin, Jeri; Robbins, Regina; Steenson, Sharalyn; Stewart, Catherine; Fisher, Christopher

    2015-01-01

    Background A community’s readiness for change is a precursor to the effective application of evidence-based practices for health promotion. Research is lacking regarding potential strategies to improve readiness to address obesity-related health issues in underserved communities. Community Context This case study describes SaludABLEOmaha, an initiative to increase readiness of residents in a Midwestern Latino community to address obesity and adopt healthy lifestyles. Methods SaludABLEOmaha emphasized 2 core approaches, youth activism and collaboration among public and private institutions, which we applied to planning and implementing tactics in support of 3 interconnected strategies: 1) social marketing and social media, 2) service learning in schools (ie, curricula that integrate hands-on community service with instruction and reflection), and 3) community and business engagement. Following the Community Readiness Model protocol (http://triethniccenter.colostate.edu/communityReadiness.htm), structured interviews were conducted with community leaders and analyzed before and 2.5 years after launch of the program. Outcome The community increased in readiness from stage 3 of the Community Readiness Model, “vague awareness,” at baseline to stage 5, “preparation,” at follow-up. Interpretation SaludABLEOmaha improved community readiness (eg, community knowledge, community climate), which probably contributed to the observed increase in readiness to address obesity through healthy lifestyle. Community mobilization approaches such as youth activism integrated with social marketing and social media tactics can improve community responsiveness to obesity prevention and diminish health disparities. PMID:25674679

  16. 75 FR 15403 - Plan Revision for Malheur, Umatilla and Wallowa-Whitman National Forests, Oregon and Washington...

    Science.gov (United States)

    2010-03-29

    ... integrate this interim direction or resolve conflicts between the existing plan language and the interim... opportunities to exercise cultural and spiritual traditions. Local communities provide infrastructure that... rule to be in conflict with law and enjoining its implementation and a different Federal Court...

  17. Readiness to change criminal women and men

    Directory of Open Access Journals (Sweden)

    Krzysztof Biel

    2017-12-01

    Full Text Available The readiness of offenders to social rehabilitation is a new category in our country. Meanwhile, the research conducted in many countries indicates its usefulness in the diagnosis and selection of participants of rehabilitation programmes. This entails more effective interaction with convicted persons and greater responsibility on the part of convicted people for their own social rehabilitation process. The aim of this article is to present the main assumptions and models of readiness for change and their usefulness in social rehabilitation practice and to present pilot studies of readiness for change among criminal women and men in Kraków. Application of the Polish adaptation of the CVTRQ questionnaire made it possible to determine the level of convicted persons’ readiness, taking into account deficits in particular scales of the questionnaire and variables differentiating the group of ready and not ready people. At the end, guidelines for further research will be presented.

  18. Safety report for Central Interim Storage facility for radioactive waste from small producers

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.

    2004-01-01

    In 1999 the Agency for Radwaste Management took over the management of the Central Interim Storage (CIS) in Brinje, intended only for radioactive waste from industrial, medical and research applications. With the transfer of the responsibilities for the storage operation, ARAO, the new operator of the facility, received also the request from the Slovenian Nuclear Safety Administration for refurbishment and reconstruction of the storage and for preparation of the safety report for the storage with the operational conditions and limitations. In order to fulfill these requirements ARAO first thoroughly reviewed the existing documentation on the facility, the facility itself and the stored inventory. Based on the findings of this review ARAO prepared several basic documents for improvement of the current conditions in the storage facility. In October 2000 the Plan for refurbishment and modernization of the CIS was prepared, providing an integral approach towards remediation and refurbishment of the facility, optimization of the inventory arrangement and modernization of the storage and storing utilization. In October 2001 project documentation for renewal of electric installations, water supply and sewage system, ventilation system, the improvements of the fire protection and remediation of minor defects discovered in building were completed according to the Act on Construction. In July 2003 the safety report was prepared, based on the facility status after the completion of the reconstruction works. It takes into account all improvements and changes introduced by the refurbishment and reconstruction of the facility according to project documentation. Besides the basic characteristics of the location and its surrounding, it also gives the technical description of the facility together with proposed solutions for the renewal of electric installations, renovation of water supply and sewage system, refurbishment of the ventilation system, the improvement of fire

  19. Healthcare professionals' readiness for an interprofessional orthogeriatric unit: A cross-sectional survey

    DEFF Research Database (Denmark)

    Abrahamsen, Charlotte; Nørgaard, Birgitte; Draborg, Eva

    2016-01-01

    aspects; those voiced by the nursing staff related to work strain and the interests of their professional group whereas the physicians’ reservations concentrated on the planning of the change. The exploration of readiness for organizational change among health care professionals offers managers......Professionals´ readiness for change is a precursor to successful implementation of organizational changes. An assessment of readiness for change can set the stage for the implementation by providing information regarding staff members’ beliefs and attitudes prior to an organizational change. We...... conducted a cross-sectional survey to assess readiness for change (N=223 employees) in a hospital on the verge of implementing an interprofessional, co-managed, orthogeriatric unit. Staff members from three departments with tasks related to orthogeriatric patients were invited to answer a web...

  20. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    Energy Technology Data Exchange (ETDEWEB)

    Rowsell, David Leon [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2015-06-01

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  1. NASA Technology Readiness Level Definitions

    Science.gov (United States)

    Mcnamara, Karen M.

    2012-01-01

    This presentation will cover the basic Technology Readiness Level (TRL) definitions used by the National Aeronautics and Space Administration (NASA) and their specific wording. We will discuss how they are used in the NASA Project Life Cycle and their effectiveness in practice. We'll also discuss the recent efforts by the International Standards Organization (ISO) to develop a broadly acceptable set of TRL definitions for the international space community and some of the issues brought to light. This information will provide input for further discussion of the use of the TRL scale in manufacturing.

  2. Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  3. Taking the Bite Out of Dental Readiness: Assessing Readiness in the National Guard and the Reserves

    Science.gov (United States)

    2009-04-01

    dental sealants and home care can prevent most dental disease and keep it from getting worse. Each member should be encouraged to enroll and use...position of the Department of the Army, Department of Defense, or the U.S. Government. TAKING THE BITE OUT OF DENTAL READINESS: ASSESSING READINESS IN THE...CONTRACT NUMBER Taking the Bite Out of Dental Readiness: Assessing Readiness in the National Guard and the Reserves 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  4. Exploring the need for Transition Readiness Scales within cystic fibrosis services: A qualitative descriptive study.

    Science.gov (United States)

    Bourke, Mary; Houghton, Catherine

    2018-03-08

    To explore healthcare professionals' and patients' perceptions of the potential use of a Transition Readiness Scale in cystic fibrosis care. This included an examination of barriers and facilitators to its implementation along with the identification of key items to include in a Transition Readiness Scale. Due to increasing life expectancy and improved quality of life, more adolescents with cystic fibrosis are transitioning from paediatric to adult health care. To assess and correctly manage this transition, a more structured approach to transition is advocated. This can be achieved using a Transition Readiness Scale to potentially identify or target areas of care in which the adolescent may have poor knowledge. These key items include education, developmental readiness taking into account relationships, reproduction, future plans and self-management skills. Existing tools to gauge readiness concentrate mainly on education and self-care needs assessment as their key items. Currently, there is no specific cystic fibrosis Transition Readiness Scale in use in Ireland or internationally. The study used a descriptive qualitative design. Data were collected using semi-structured interviews (n = 8) and analysed using a thematic approach. The findings identified the potential benefits of this tool and second the resources which need to be in place before its development and implementation into cystic fibrosis services. Transition Readiness Scales have substantial relevance with cystic fibrosis services emphasising the importance of establishing the necessary resources prior to its implementation. These were identified as more staff, a dedicated private space and staff training and education. Significant resources are needed to fully integrate Transition Readiness Scales in practice. The study findings suggest multidisciplinary collaborations, and patient engagement is pivotal in planning and easing the transition process for adolescents with cystic fibrosis. © 2018 The

  5. The Costly Consequences of not Being Socially and Behaviorally Ready to Learn by Kindergarten in Baltimore City.

    Science.gov (United States)

    Bettencourt, Amie F; Gross, Deborah; Ho, Grace; Perrin, Nancy

    2018-02-01

    Social, emotional, and behavioral skills are foundational to learning and long-term success. However, poverty and exposure to adverse childhood experiences reduce the chances of children entering kindergarten socially-behaviorally ready to learn. This study examined the unique impact of 5-year-old children (N = 11,412) entering kindergarten not socially-behaviorally ready on three costly school outcomes by fourth grade in Baltimore City Public Schools: being retained in grade, receiving services and supports through an IEP or 504 plan, and being suspended/expelled. Controlling for all other types of school readiness, students not identified as socially-behaviorally ready for kindergarten were more likely to experience all three school outcomes. Findings underscore the importance of early prevention and intervention strategies targeting parents and social-behavioral readiness skills during the first 5 years of life.

  6. Interim Basis for PCB Sampling and Analyses

    International Nuclear Information System (INIS)

    BANNING, D.L.

    2001-01-01

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the US. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposal approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QAlG4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842/Rev.1 A, Vol. IV, Section 4.16 (Banning 1999)

  7. The EMEFS model evaluation. An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  8. E-Area Performance Assessment Interim Measures Assessment FY2005

    International Nuclear Information System (INIS)

    Stallings, M

    2006-01-01

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway 14 C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision

  9. Basis for Interim Operation for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2003-01-01

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  10. E-Area Performance Assessment Interim Measures Assessment FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  11. Psychological readiness of students for professional life

    Directory of Open Access Journals (Sweden)

    OLHA UHRYN

    2013-09-01

    Full Text Available The article is devoted to the psychological readiness of student’s personality for professional life. The author considers components of readiness that promote self-development and self-realisation in the professional sphere, and presents the results of an empirical study of willingness to work in a professional field.

  12. Kindergarten Teachers' Perceptions of Students' Readiness Skills

    Science.gov (United States)

    Soltero-Ruiz, Erlinda E.

    2013-01-01

    Children need to be ready to enter kindergarten, or they may begin to fall further and further behind. The achievement gap may start prior to children entering kindergarten due to their lack of early learning opportunities. The purpose of this study was to examine the perceptions of kindergarten teachers regarding which readiness skills preschool…

  13. Understanding Early Educators' Readiness to Change

    Science.gov (United States)

    Peterson, Shira M.

    2012-01-01

    Researchers in the fields of humanistic psychology, counseling, organizational change, and implementation science have been asking a question that is at the heart of today's early care and education quality improvement efforts: When it comes to changing one's behavior, what makes a person ready to change? Although the concept of readiness to…

  14. Overview: Texas College and Career Readiness Standards

    Science.gov (United States)

    Texas Higher Education Coordinating Board, 2009

    2009-01-01

    The Texas College and Career Readiness Standards define what students should know and be able to accomplish in order to succeed in entry-level college courses or skilled workforce opportunities upon graduation from high school. This paper answers the following questions: (1) Who developed the Texas College and Career Readiness Standards?; (2) What…

  15. Soldier Readiness: Insights from Qualitative Interviews

    Science.gov (United States)

    2018-01-10

    PHYSICAL FITNESS SOLDIER READINESS INTERPERSONAL RELATIONS FEEDBACK PSYCHOLOGY ARMY PERSONNEL SOCIAL PSYCHOLOGY MORALS(SOCIAL... PSYCHOLOGY ) STRESSORS MOTIVATION GROUP DYNAMICS BEHAVIORAL SCIENCES CONFLICT( PSYCHOLOGY ) U.S. Army Natick Soldier Research, Development...during a mission? • What psychological states, traits, and behaviors are associated with SE aspects of Soldier Readiness? • What training practices

  16. From Readiness to Action: How Motivation Works

    Directory of Open Access Journals (Sweden)

    Kruglanski Arie W.

    2014-09-01

    Full Text Available We present a new theoretical construct labeled motivational readiness. It is defined as the inclination, whether or not ultimately implemented, to satisfy a desire. A general model of readiness is described which builds on the work of prior theories, including animal learning models and personality approaches, and which aims to integrate a variety of research findings across different domains of motivational research. Components of this model include the Want state (that is, an individual’s currently active desire, and the Expectancy of being able to satisfy that Want. We maintain that the Want concept is the critical ingredient in motivational readiness: without it, readiness cannot exist. In contrast, some motivational readiness can exist without Expectancy. We also discuss the role of incentive in motivational readiness. Incentive is presently conceived of in terms of a Match between a Want and a Perceived Situational Affordance. Whereas in classic models incentive was portrayed as a first order determinant of motivational readiness, here we describe it as a second order factor which affects readiness by influencing Want, Expectancy, or both. The new model’s relation to its theoretical predecessors, and its implications for future research, also are discussed.

  17. Universal School Readiness Screening at Kindergarten Entry

    Science.gov (United States)

    Quirk, Matthew; Dowdy, Erin; Dever, Bridget; Carnazzo, Katherine; Bolton, Courtney

    2018-01-01

    Researchers examined the concurrent and predictive validity of a brief (12-item) teacher-rated school readiness screener, the Kindergarten Student Entrance Profile (KSEP), using receiver operating characteristic (ROC) curve analysis to examine associations between (N = 78) children's social-emotional (SE) and cognitive (COG) readiness with…

  18. Solar Sail Propulsion Technology Readiness Level Database

    Science.gov (United States)

    Adams, Charles L.

    2004-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 solar sail system design and development hardware demonstration activities over the past 20 months. Able Engineering Company (AEC) of Goleta, CA is leading one team and L Garde, Inc. of Tustin, CA is leading the other team. Component, subsystem and system fabrication and testing has been completed successfully. The goal of these activities is to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by 2006. These activities will culminate in the deployment and testing of 20-meter solar sail system ground demonstration hardware in the 30 meter diameter thermal-vacuum chamber at NASA Glenn Plum Brook in 2005. This paper will describe the features of a computer database system that documents the results of the solar sail development activities to-date. Illustrations of the hardware components and systems, test results, analytical models, relevant space environment definition and current TRL assessment, as stored and manipulated within the database are presented. This database could serve as a central repository for all data related to the advancement of solar sail technology sponsored by the ISPT, providing an up-to-date assessment of the TRL of this technology. Current plans are to eventually make the database available to the Solar Sail community through the Space Transportation Information Network (STIN).

  19. Community-Wide Zero Energy Ready Home Standard

    Energy Technology Data Exchange (ETDEWEB)

    Herk, A. [IBACOS, Inc., Pittsburght, PA (United States); Beggs, T. [IBACOS, Inc., Pittsburght, PA (United States)

    2016-02-05

    This report outlines the steps a developer can use when looking to create and implement higher performance standards such as the U.S. Department of Energy (DOE) Zero Energy Ready Home (ZERH) standards in a community. The report also describes the specific examples of how this process was followed by a developer, Forest City, in the Stapleton community in Denver, Colorado. IBACOS described the steps used to begin to bring the DOE ZERH standard to the Forest City Stapleton community based on 15 years of community-scale development work done by IBACOS. As a result of this prior IBACOS work, the team gained an understanding of the various components that a master developer needs to consider and created strategies for incorporating those components in the initial phases of development to achieve higher performance buildings in the community. An automated scoring system can be used to perform an internal audit that provides a detailed and consistent evaluation of how several homes under construction or builders' floor plans compare with the requirements of the DOE Zero Energy Ready Home program. This audit can be performed multiple times at specific milestones during construction to allow the builder to make changes as needed throughout construction for the project to meet Zero Energy Ready Home standards. This scoring system also can be used to analyze a builder's current construction practices and design.

  20. TMI-2 core-examination program: INEL facilities readiness study

    International Nuclear Information System (INIS)

    McLaughlin, T.B.

    1983-02-01

    This report reviews the capability and readiness of remote handling facilities at the Idaho National Engineering Laboratory (INEL) to receive, and store the TMI-2 core, and to examine and analyze TMI-2 core samples. To accomplish these objectives, the facilities must be able to receive commercial casks, unload canisters from the casks, store the canisters, open the canisters, handle the fuel debris and assemblies, and perform various examinations. The report identifies documentation, including core information, necessary to INEL before receiving the entire TMI-2 core. Also identified are prerequisites to INEL's receipt of the first canister: costs, schedules, and a preliminary project plan for the tasks

  1. e-Health readiness assessment tools for healthcare institutions in developing countries.

    Science.gov (United States)

    Khoja, Shariq; Scott, Richard E; Casebeer, Ann L; Mohsin, M; Ishaq, A F M; Gilani, Salman

    2007-08-01

    e-Health Readiness refers to the preparedness of healthcare institutions or communities for the anticipated change brought by programs related to Information and Communications Technology (ICT). This paper presents e-Health Readiness assessment tools developed for healthcare institutions in developing countries. The objectives of the overall study were to develop e-health readiness assessment tools for public and private healthcare institutions in developing countries, and to test these tools in Pakistan. Tools were developed using participatory action research to capture partners' opinions, reviewing existing tools, and developing a conceptual framework based on available literature on the determinants of access to e-health. Separate tools were developed for managers and for healthcare providers to assess e-health readiness within their institutions. The tools for managers and healthcare providers contained 54 and 50 items, respectively. Each tool contained four categories of readiness. The items in each category were distributed into sections, which either represented a determinant of access to e-health, or an important aspect of planning. The conceptual framework, and the validity and reliability testing of these tools are presented in separate papers. e-Health readiness assessment tools for healthcare providers and managers have been developed for healthcare institutions in developing countries.

  2. Interim summary report of the safety case 2009

    International Nuclear Information System (INIS)

    2010-03-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy), Posiva is preparing to submit a construction license application for the final disposal spent nuclear fuel at the Olkiluoto site, Finland, by the end of the year 2012. Disposal will take place in a geological repository implemented according to the KBS-3 method. The long-term safety section supporting the license application will be based on a safety case that, according to the internationally adopted definition, will be a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. The present Interim Summary Report represents a major contribution to the development of this safety case. The report has been compiled in accordance with Posiva's current plan for preparing this safety case. A full safety case for the KBS-3V variant will be developed to support the Preliminary Safety Assessment Report (PSAR) in 2012. The report outlines the current design and safety concept for the planned repository. It summarises the approach used to formulate scenarios for the evolution of the disposal system over time, describes these scenarios and presents the main models and computer codes used to analyse them. It also discusses compliance with Finnish regulatory requirements for long-term safety of a geological repository and gives the main evidence, arguments and analyses that lead to confidence, on the part of Posiva, in the long-term safety of the planned repository. Current understanding of the evolution of the disposal system indicates that, except a few unlikely circumstances affecting a small number of canisters, spent fuel will remain isolated, and the radionuclides contained within the canisters, for hundreds of thousands of years or more, in accordance with the base scenario. Confidence in this base scenario derives, in the first place, from the

  3. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    Energy Technology Data Exchange (ETDEWEB)

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  4. 78 FR 56750 - Interim Staff Guidance on Environmental Issues Associated With New Reactors

    Science.gov (United States)

    2013-09-13

    ... COMMISSION Interim Staff Guidance on Environmental Issues Associated With New Reactors AGENCY: Nuclear... Staff Guidance (ISG) ESP/COL-ISG-026, ``Interim Staff Guidance on Environmental Issues ] Associated with... Notice: Draft Interim Staff Guidance on Environmental Issues Associated with New Reactors. ML12326A742...

  5. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Science.gov (United States)

    2013-04-05

    ... CFR Part 431 RIN 1904-AC36 Energy Conservation Program: Availability of the Interim Technical Support... interim technical support document (TSD) for high-intensity discharge (HID) lamps energy conservation....aspx/ruleid/23 . This Web page contains links to the interim technical support document and other...

  6. Are they ready? Organizational readiness for change among clinical teaching teams.

    Science.gov (United States)

    Bank, Lindsay; Jippes, Mariëlle; Leppink, Jimmie; Scherpbier, Albert Jja; den Rooyen, Corry; van Luijk, Scheltus J; Scheele, Fedde

    2017-01-01

    Curriculum change and innovation are inevitable parts of progress in postgraduate medical education (PGME). Although implementing change is known to be challenging, change management principles are rarely looked at for support. Change experts contend that organizational readiness for change (ORC) is a critical precursor for the successful implementation of change initiatives. Therefore, this study explores whether assessing ORC in clinical teaching teams could help to understand how curriculum change takes place in PGME. Clinical teaching teams in hospitals in the Netherlands were requested to complete the Specialty Training's Organizational Readiness for curriculum Change, a questionnaire to measure ORC in clinical teaching teams. In addition, change-related behavior was measured by using the "behavioral support-for-change" measure. A two-way analysis of variance was performed for all response variables of interest. In total, 836 clinical teaching team members were included in this study: 288 (34.4%) trainees, 307 (36.7%) clinical staff members, and 241 (28.8%) program directors. Overall, items regarding whether the program director has the authority to lead scored higher compared with the other items. At the other end, the subscales "management support and leadership," "project resources," and "implementation plan" had the lowest scores in all groups. The study brought to light that program directors are clearly in the lead when it comes to the implementation of educational innovation. Clinical teaching teams tend to work together as a team, sharing responsibilities in the implementation process. However, the results also reinforce the need for change management support in change processes in PGME.

  7. Safety Consideration for a Wet Interim Spent Fuel Store at Conceptual Design Stage

    International Nuclear Information System (INIS)

    Astoux, Marion

    2014-01-01

    EDF Energy plans to build and operate two UK EPRs at the Hinkley Point C (HPC) site in Somerset, England. Spent fuel from the UK EPRs will need to be managed from the time it is discharged from the reactor until it is ultimately disposed of and this will involve storing the spent fuel for a period in the fuel building and thereafter in a dedicated interim facility until it can be emplaced within the UK Geological Disposal Facility. EDF Energy has proposed that this interim store should be located on the Hinkley Point site which is consistent with UK policy. This Interim Spent Fuel Store (ISFS) will have the capability to store for at least one hundred years the spent fuel arising from the operation of the two EPR units (sixty years operation). Therefore, specificities regarding the lifetime of the facility have to be accounted for its design. The choice of interim storage technology was considered in some depth for the HPC project and wet storage (pool) was selected. The facility is currently at conceptual design stage, although its construction will be part of main site construction phase. Safety functions and safety requirements for this storage facility have been defined, in compliance with WENRA 'Waste and Spent Fuel Storage - Safety Reference Level Report' and IAEA Specific Safety Guide no. 15 'Storage of Spent Nuclear Fuel'. EDF technical know-how, operational feedback on existing storage pools, UK regulatory context and Fukushima experience feedback have also been accounted for. Achievement of the safety functions as passively as reasonably practicable is a key issue for the design, especially in accident situations. Regarding lifetime aspects, ageing management of equipments, optimisation of the refurbishment, climate change, passivity of the facility, and long-term achievement of the safety functions are among the subjects to consider. Adequate Operational Limits and Conditions will also have to be defined, to enable the long-term achievement of the safety

  8. Readiness of communities to engage with childhood obesity prevention initiatives in disadvantaged areas of Victoria, Australia.

    Science.gov (United States)

    Cyril, Sheila; Polonsky, Michael; Green, Julie; Agho, Kingsley; Renzaho, Andre

    2017-07-01

    . However, no studies in Australia have assessed disadvantaged communities' readiness to engage in obesity prevention initiatives. What does this paper add? This paper addresses the current gap in the knowledge of disadvantaged communities' level of readiness to engage in childhood obesity prevention initiatives in Australia. The study also identified the key factors responsible for low readiness of disadvantaged communities to participate in current childhood obesity prevention services. By using the Community Readiness model this study shows the readiness levels specific to the various dimensions of the model; Understanding dimension-specific readiness allows us to identify strategies that are tailored to each dimension, as guided by the model. What are the implications for practitioners? With the increasing burden of childhood obesity on disadvantaged communities, policymakers and health practitioners are facing a crisis in obesity prevention and management. Almost every year, new interventions are being planned and implemented. However if the target communities are not ready to participate in the available interventions these efforts are futile. This study exposes the key factors responsible for low readiness to participate in current obesity prevention services by disadvantaged communities. Addressing these key factors and improving readiness before designing new interventions will improve the participation of disadvantaged communities in those interventions. The study findings ultimately have the potential of reducing obesity-related disparities in Australia.

  9. Predicting consumers’ intention to purchase ready- to-eat meals: The role of moral attitude

    NARCIS (Netherlands)

    Olsen, N.V.; Sijtsema, S.J.; Hall, G.

    2010-01-01

    This study investigates the usefulness of integrating moral attitude into the Theory of Planned Behavior (TPB) model when predicting intention to consume ready-to-eat (RTE) meals. Questionnaire data were gathered in three countries: Norway (N = 112), The Netherlands (N = 99), and Finland (N = 134)

  10. Summary of Injury Prevention Activities Supporting the Army Soldier Medical Readiness Campaign, 2011-2014

    Science.gov (United States)

    2016-10-30

    collaborate with Army partners on injury prevention /human performance optimization projects, and enhance communication of evidence- based lessons learned to...6.2 APHC Injury Prevention contributions to SMRC IP 10.0: Improve Soldier Injury Prevention /Human Performance ...Soldier Medical Readiness Campaign Plan (SMR-CP), objectives to inform evidence- based injury prevention /human performance optimization programs and

  11. An assessment of the readiness for introduction of the HPV vaccine ...

    African Journals Online (AJOL)

    Formative research assessing human papillomavirus (HPV) vaccine readiness in Uganda was conducted in 2007. The objective was to generate evidence for government decision-making and operational planning for HPV vaccine introduction. Qualitative research methods with children, parents, teachers, community ...

  12. Mapping Fiscal Resources in South Hampton Roads Virginia to Support School Readiness. Regional Summary

    Science.gov (United States)

    Finance Project, 2009

    2009-01-01

    In 2007, committees of key stakeholders in the five cities of Chesapeake, Norfolk, Suffolk, Portsmouth, and Virginia Beach developed Collaborative Action Plans focused on key strategies to ensure that children in each city "arrive at kindergarten healthy and ready to succeed in school, and in life." With leadership from Smart Beginnings…

  13. DOE Zero Energy Ready Home Case Study: Mandalay Homes — Pronghorn Ranch, Prescott Valley, AZ

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    The builder has certified 20 homes to DOE Zero Energy Ready Home program and plans are underway for 50 more. Winner of a Production Builder prize in the 2014 Housing Innovation Awards, the homes achieved a HERS score of 48 without photovoltaics (PV) or HERS 25 with 3.5 kW PV included.

  14. Pupils' Readiness for Self-Regulated Learning in the Forethought Phase of Exploratory Production

    Science.gov (United States)

    Metsärinne, Mika; Kallio, Manne; Virta, Kalle

    2015-01-01

    This article discusses pupils' readiness for self-regulation in Exploratory Production in Technology Education. In the forethought phase of Exploratory Production, pupils envision and regulate their technological production activities. Next, in the performance phase, the envisioned goals are tried and implemented through ideating, planning and…

  15. Irradiation of ready meals for microbiological safety and shelf-life ...

    African Journals Online (AJOL)

    Potential pathogens isolated from waakye and the meals prepared under HACCP plan included Escherichia coli, Klebsiella spp., Serratia spp., and Enterobacter spp. Subsequent studies will exploit the potential of irradiation to eliminate pathogens and ensure the microbiological safety of ready-to-eat meals. Waakye (riz et ...

  16. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  17. A review of proposed Glen Canyon Dam interim operating criteria

    Energy Technology Data Exchange (ETDEWEB)

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  18. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  19. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Certa, P.J.

    1998-01-01

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  20. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Honeyman, J.O.

    1998-01-01

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  1. Readiness for hospital discharge: A concept analysis.

    Science.gov (United States)

    Galvin, Eileen Catherine; Wills, Teresa; Coffey, Alice

    2017-11-01

    To report on an analysis on the concept of 'readiness for hospital discharge'. No uniform operational definition of 'readiness for hospital discharge' exists in the literature; therefore, a concept analysis is required to clarify the concept and identify an up-to-date understanding of readiness for hospital discharge. Clarity of the concept will identify all uses of the concept; provide conceptual clarity, an operational definition and direction for further research. Literature review and concept analysis. A review of literature was conducted in 2016. Databases searched were: Academic Search Complete, CINAHL Plus with Full Text, PsycARTICLES, Psychology and Behavioural Sciences Collection, PsycINFO, Social Sciences Full Text (H.W. Wilson) and SocINDEX with Full Text. No date limits were applied. Identification of the attributes, antecedents and consequences of readiness for hospital discharge led to an operational definition of the concept. The following attributes belonging to 'readiness for hospital discharge' were extracted from the literature: physical stability, adequate support, psychological ability, and adequate information and knowledge. This analysis contributes to the advancement of knowledge in the area of hospital discharge, by proposing an operational definition of readiness for hospital discharge, derived from the literature. A better understanding of the phenomenon will assist healthcare professionals to recognize, measure and implement interventions where necessary, to ensure patients are ready for hospital discharge and assist in the advancement of knowledge for all professionals involved in patient discharge from hospital. © 2017 John Wiley & Sons Ltd.

  2. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  3. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project's cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion

  4. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  5. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  6. A theory of organizational readiness for change.

    Science.gov (United States)

    Weiner, Bryan J

    2009-10-19

    Change management experts have emphasized the importance of establishing organizational readiness for change and recommended various strategies for creating it. Although the advice seems reasonable, the scientific basis for it is limited. Unlike individual readiness for change, organizational readiness for change has not been subject to extensive theoretical development or empirical study. In this article, I conceptually define organizational readiness for change and develop a theory of its determinants and outcomes. I focus on the organizational level of analysis because many promising approaches to improving healthcare delivery entail collective behavior change in the form of systems redesign--that is, multiple, simultaneous changes in staffing, work flow, decision making, communication, and reward systems. Organizational readiness for change is a multi-level, multi-faceted construct. As an organization-level construct, readiness for change refers to organizational members' shared resolve to implement a change (change commitment) and shared belief in their collective capability to do so (change efficacy). Organizational readiness for change varies as a function of how much organizational members value the change and how favorably they appraise three key determinants of implementation capability: task demands, resource availability, and situational factors. When organizational readiness for change is high, organizational members are more likely to initiate change, exert greater effort, exhibit greater persistence, and display more cooperative behavior. The result is more effective implementation. The theory described in this article treats organizational readiness as a shared psychological state in which organizational members feel committed to implementing an organizational change and confident in their collective abilities to do so. This way of thinking about organizational readiness is best suited for examining organizational changes where collective behavior

  7. A theory of organizational readiness for change

    Directory of Open Access Journals (Sweden)

    Weiner Bryan J

    2009-10-01

    Full Text Available Abstract Background Change management experts have emphasized the importance of establishing organizational readiness for change and recommended various strategies for creating it. Although the advice seems reasonable, the scientific basis for it is limited. Unlike individual readiness for change, organizational readiness for change has not been subject to extensive theoretical development or empirical study. In this article, I conceptually define organizational readiness for change and develop a theory of its determinants and outcomes. I focus on the organizational level of analysis because many promising approaches to improving healthcare delivery entail collective behavior change in the form of systems redesign--that is, multiple, simultaneous changes in staffing, work flow, decision making, communication, and reward systems. Discussion Organizational readiness for change is a multi-level, multi-faceted construct. As an organization-level construct, readiness for change refers to organizational members' shared resolve to implement a change (change commitment and shared belief in their collective capability to do so (change efficacy. Organizational readiness for change varies as a function of how much organizational members value the change and how favorably they appraise three key determinants of implementation capability: task demands, resource availability, and situational factors. When organizational readiness for change is high, organizational members are more likely to initiate change, exert greater effort, exhibit greater persistence, and display more cooperative behavior. The result is more effective implementation. Summary The theory described in this article treats organizational readiness as a shared psychological state in which organizational members feel committed to implementing an organizational change and confident in their collective abilities to do so. This way of thinking about organizational readiness is best suited for

  8. Year 2000 readiness for Tepco's nuclear power plants

    International Nuclear Information System (INIS)

    Tachibana, N.; Tomioka, Y.

    2000-01-01

    In line with our policy of positioning the Year 2000 (Y2K) problem as a major management task, we have performed Y2K readiness. We started to survey the influence of Y2K problem at Nuclear Power Plants (NPP) on February, 1996, and completed Y2K ready of NPP on October, 1999. This paper presents Y2K readiness of our NPP. Our NPP instrumentation and control can be roughly divided into two types (Monitoring System showing NPP's status, Control System to control equipment of NPP). We surveyed hardware and software of these systems to assess the influence of these systems by Y2K problem. For survey of hardware, we picked up all chips of Real Time Clock (RTC) with check of the lists of all parts on board. And we surveyed integrity to Y2K problem of picked up RTCs with their specification, instruction manual and so on. For survey of software, we picked up the system using a time parameter in software with check of system's source program. And we surveyed whether the system using a time parameter had functions that were influenced by Y2K problem. As the result of the survey, for both monitoring systems and control systems, there was no RTC chip having Y2K problem. And there was no control system with software modification required. It was confirmed that some of Monitoring Systems were required software modification. The modification of these systems was completed by October, 1999. We performed Simulated Test of Y2K to validate the result of survey and software modification. Simulated Test was performed for the confirmation of the system integrity when the system was input critical dates of Y2K problem. As the result of Simulated Test, there was no system that was confirmed the failure of survey and software modification. In addition to these Y2K readiness, referring to the existing contingency plan for emergency situations such as a system failure and a natural disaster like earthquakes and typhoons, we have completed contingency planning for Y2K. It is decided in

  9. Some Thoughts on Systematic Reading Readiness Instruction.

    Science.gov (United States)

    Palardy, J. Michael

    1984-01-01

    Examines four specific areas of reading readiness--visual discrimination, visual memory, auditory discrimination, and auditory comprehension--and reviews teaching strategies in each of the four areas. (FL)

  10. Enhancing Mental Readiness in Military Personnel

    National Research Council Canada - National Science Library

    Thompson, Megan M; McCreary, Donald R

    2006-01-01

    In this paper we explore how the psychological literature on stress and coping might inform military training programs to enhance "mental readiness" as a method to develop the baseline psychological...

  11. Information Assurance and Forensic Readiness

    Science.gov (United States)

    Pangalos, Georgios; Katos, Vasilios

    Egalitarianism and justice are amongst the core attributes of a democratic regime and should be also secured in an e-democratic setting. As such, the rise of computer related offenses pose a threat to the fundamental aspects of e-democracy and e-governance. Digital forensics are a key component for protecting and enabling the underlying (e-)democratic values and therefore forensic readiness should be considered in an e-democratic setting. This position paper commences from the observation that the density of compliance and potential litigation activities is monotonically increasing in modern organizations, as rules, legislative regulations and policies are being constantly added to the corporate environment. Forensic practices seem to be departing from the niche of law enforcement and are becoming a business function and infrastructural component, posing new challenges to the security professionals. Having no a priori knowledge on whether a security related event or corporate policy violation will lead to litigation, we advocate that computer forensics need to be applied to all investigatory, monitoring and auditing activities. This would result into an inflation of the responsibilities of the Information Security Officer. After exploring some commonalities and differences between IS audit and computer forensics, we present a list of strategic challenges the organization and, in effect, the IS security and audit practitioner will face.

  12. How Satellites Have Contributed to Building a Weather Ready Nation

    Science.gov (United States)

    Lapenta, W.

    2017-12-01

    NOAA's primary mission since its inception has been to reduce the loss of life and property, as well as disruptions from, high impact weather and water-related events. In recent years, significant societal losses resulting even from well forecast extreme events have shifted attention from the forecast alone toward ensuring societal response is equal to the risks that exist for communities, businesses and the public. The responses relate to decisions ranging from coastal communities planning years in advance to mitigate impacts from rising sea level, to immediate lifesaving decisions such as a family seeking adequate shelter during a tornado warning. NOAA is committed to building a "Weather-Ready Nation" where communities are prepared for and respond appropriately to these events. The Weather-Ready Nation (WRN) strategic priority is building community resilience in the face of increasing vulnerability to extreme weather, water, climate and environmental threats. To build a Weather-Ready Nation, NOAA is enhancing Impact-Based Decision Support Services (IDSS), transitioning science and technology advances into forecast operations, applying social science research to improve the communication and usefulness of information, and expanding its dissemination efforts to achieve far-reaching readiness, responsiveness and resilience. These four components of Weather-Ready Nation are helping ensure NOAA data, products and services are fully utilized to minimize societal impacts from extreme events. Satellite data and satellite products have been important elements of the national Weather Service (NWS) operations for more than 40 years. When one examines the uses of satellite data specific to the internal forecast and warning operations of NWS, two main applications are evident. The first is the use of satellite data in numerical weather prediction models; the second is the use of satellite imagery and derived products for mesoscale and short-range weather warning and

  13. Solar Training Network and Solar Ready Vets

    Energy Technology Data Exchange (ETDEWEB)

    Dalstrom, Tenley Ann

    2016-09-14

    In 2016, the White House announced the Solar Ready Vets program, funded under DOE's SunShot initiative would be administered by The Solar Foundation to connect transitioning military personnel to solar training and employment as they separate from service. This presentation is geared to informing and recruiting employer partners for the Solar Ready Vets program, and the Solar Training Network. It describes the programs, and the benefits to employers that choose to connect to the programs.

  14. Readiness Reporting for an Adaptive Army

    Science.gov (United States)

    2013-01-01

    bring clarity and fixity to the “‘denominator,”’ i.e., the standards against which readiness is compared, particularly with regard to the meaning of FSO...definition, institutionalization, and fixity , and linking those emerging needs from the next demand signal more formally to the documents...recommendation, the Army above all would have to do the following: • Modify the readiness reporting system and AR 220-1 so as to bring clarity and fixity

  15. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    DEFF Research Database (Denmark)

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning

    2007-01-01

    group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients...

  16. The Forward Testing Effect: Interim Testing Enhances Inductive Learning

    Science.gov (United States)

    Yang, Chunliang; Shanks, David R.

    2018-01-01

    "Induction" refers to the process in which people generalize their previous experience when making uncertain inferences about the environment that go beyond direct experience. Here we show that interim tests strongly enhance inductive learning. Participants studied the painting styles of eight famous artists across four lists, each…

  17. 46 CFR 308.303 - Amounts insured under interim binder.

    Science.gov (United States)

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  18. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  19. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  20. 40 CFR 266.103 - Interim status standards for burners.

    Science.gov (United States)

    2010-07-01

    ... during interim status to industrial furnaces (e.g., kilns, cupolas) that feed hazardous waste for a..., owners and operators shall not feed hazardous waste that has a heating value less than 5,000 Btu/lb, as..., beryllium, cadmium, chromium, lead, mercury, silver, and thallium in each feed stream (hazardous waste...

  1. System Specification for Immobilized High-Level Waste Interim Storage

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository

  2. 39 CFR 211.4 - Interim personnel regulations.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  3. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  4. Students' interim literacies as a dynamic resource for teaching and ...

    African Journals Online (AJOL)

    This article explores the notion of 'interim literacies'by drawing on data from a research project which used linguistic and intertextual analysis of first year student writing in economics to investigate the intersection of academic discourse and student voice. This research has provided a rich set of data to illustrate the ways in ...

  5. 17 CFR 210.10-01 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... flows from operating activities and showing cash changes from investing and financing activities... dividends declared per share applicable to common stock. The basis of the earnings per share computation... registrant, and where consistent with the protection of investors, permit the omission of any of the interim...

  6. Rapid Airlift Planning for Amphibious-Ready Groups

    Science.gov (United States)

    2015-09-01

    the USS Boxer (LHD 4) flight deck. The Osprey is set to replace the aging fleet of U.S. Marine Corps transport aircraft (from Military-Today.com n.d...lifts off of the USS Boxer (LHD 4) flight deck. The Osprey is set to replace the aging fleet of U.S. Marine Corps transport aircraft (from Military

  7. Medical Readiness Strategic Plan (MRSP) 1998-2004.

    Science.gov (United States)

    1998-08-01

    System. AL1.1.82. GME. Graduate Medical Education. AL1.1.83. GMO . General Medical Officer. AL1.1.84. GOTS. Government Off-the-Shelf (i.e., Software...August 1998 the DBSS (RCD: 9/2000, PAO: the TMA(IMT&R) and the CHCS II PMO). AP 1.8.1.4.13. Obtain and deploy automated blood product labeling system for...Obtain and deploy automated blood product labeling system for DBSS. AP1.8.2.4. Evaluate the impact of the use of blood components and AP1.11.1.4.3

  8. Microgrid-Ready Solar PV - Planning for Resiliency

    Energy Technology Data Exchange (ETDEWEB)

    Booth, Samuel S [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-17

    This fact sheet provides background information on microgrids with suggested language for several up-front considerations that can be added to a solar project procurement or request for proposal (RFP) that will help ensure that PV systems are built for future microgrid connection.

  9. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 4

    International Nuclear Information System (INIS)

    Wuschke, D.M.; Gillespie, P.A.; Mehta, K.K.; Henrich, W.F.; LeNeveu, D.M.; Guvanasen, V.M.; Sherman, G.R.; Donahue, D.C.; Goodwin, B.W.; Andres, T.H.

    1985-12-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the isolation of corrosion-resistant containers of waste in a vault located deep in plutonic rock. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluation of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have on man and the environment if the concept were implemented. The second such assessment was performed in 1984 and is documented in the Second Interim Assessment of the Canadian Concept for Nuclear Fuel Waste Disposal - Volumes 1-4. This volume, entitled Post-Closure Assessment, describes the methods, models and data used to perform the second post-closure assessment. The results are presented and their significance is discussed. Conclusions and planned improvements are listed. 72 refs

  10. PROJECT W-551 SUMMARY INFORMATION FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    AR, TEDESCHI

    2008-08-11

    This report provides summary data for use by the decision board to assess and select the final technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-fonnaldebyde resin. This document provides a summary of comparative data against prior weighted criteria to support technology selection. Supporting details and background for this summary are documented in the separate report, RPP-RPT-37741.

  11. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  12. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  13. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunction with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.

  14. Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

    International Nuclear Information System (INIS)

    1995-04-01

    The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project

  15. Characterization of void volume VOC concentration in vented TRU waste drums - an interim report

    International Nuclear Information System (INIS)

    Liekhus, K.J.

    1994-09-01

    A test program is underway at the Idaho National Engineering Laboratory to determine if the concentration of volatile organic compounds (VOCs) in the drum headspace is representative of the VOC concentration in the entire drum void space and to demonstrate that the VOC concentration in the void space of each layer of confinement can be estimated using a model incorporating diffusion and permeation transport principles and limited waste drum sampling data. An experimental test plan was developed requiring gas sampling of 66 transuranic (TRU) waste drums. This interim report summarizes the experimental measurements and model predictions of VOC concentration in the innermost layer of confinement from waste drums sampled and analyzed in FY 1994

  16. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    International Nuclear Information System (INIS)

    1978-01-01

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunction with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein

  17. Introducing Systematic Aging Management for Interim Storage Facilities in Germany

    International Nuclear Information System (INIS)

    Spieth-Achtnich, Angelika; Schmidt, Gerhard

    2014-01-01

    In Germany twelve at-reactor and three central (away from reactor) dry storage facilities are in operation, where the fuel is stored in combined transport-and-storage casks. The safety of the storage casks and facilities has been approved and is licensed for up to 40 years operating time. If the availability of a final disposal facility for the stored wastes (spent fuel and high-level wastes from reprocessing) will be further delayed the renewal of the licenses can become necessary in future. Since 2001 Germany had a regulatory guideline for at-reactor dry interim storage of spent fuel. In this guideline some elements of ageing were implemented, but no systematic approach was made for a state-of-the-art ageing management. Currently the guideline is updated to include all kind of storage facilities (central storages as well) and all kinds of high level waste (also waste from reprocessing). Draft versions of the update are under discussion. In these drafts a systematic ageing management is seen as an instrument to upgrade the available technical knowledge base for possible later regulatory decisions, should it be necessary to prolong storage periods to beyond the currently approved limits. It is further recognized as an instrument to prevent from possible and currently unrecognized ageing mechanisms. The generation of information on ageing can be an important basis for the necessary safety-relevant verifications for long term storage. For the first time, the demands for a systematic monitoring of ageing processes for all safety-related components of the storage system are described. In addition, for inaccessible container components such as the seal system, the neutron shielding, the baskets and the waste inventory, the development of a monitoring program is recommended. The working draft to the revised guideline also contains recommendations on non-technical ageing issues such as the long-term preservation of knowledge, long term personnel planning and long term

  18. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    suggest which basic features among the "possible futures" are playing out. Scenario planning provides for the implementation of appropriate constructed strategic responses. Scenarios allow for a pre-prepared game plan available for ready use as the future unfolds. They allow a deliberative response rather than a hastily constructed, urgent response. Copyright © 2011 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  19. Cost studies concerning decontamination and dismantling. The interim store for spent fuel at Studsvik

    International Nuclear Information System (INIS)

    Sjoeblom, Rolf; Sjoeoe, Cecilia; Lindskog, Staffan; Cato, Anna

    2006-04-01

    The interim store for spent fuel at Studsvik was designed and constructed in 1962-64. It has been used for wet storage of fuel from the Aagesta Nuclear Power Plant as well as the R2 reactor at Studsvik. The interim store comprises three cylindrical pools for fuel storage as well as equipment for handling and decontamination. The purpose of the present work is to develop methodology for calculation of future costs for decontamination and dismantling of nuclear research facilities. The analysis is based on information from Studsvik as well as results from information searches. The requirements on precision of cost calculations is high, also at early stages. The reason for this is that the funds are to be collected now but are to be used some time in the future. At the same time they should neither be insufficient nor superfluous. It is apparent from the compilation and analysis that when methodology that has been developed for the purpose of cost calculations for power reactors is applied to research facilities certain drawbacks become apparent, e.g. difficulties to carry out variation analyses. Generally, feedback of data on incurred costs for the purpose of cost calculations can be achieved by using one or more scaling factors together with weighing factors which are established based on e.g. expert judgement. For development and utilisation of such tools it is necessary to have access to estimated costs together with incurred ones. In the report, the following combination of aspects is identified as being of primary significance for achieving a high precision: Calculations with the possibility to calibrate against incurred costs; Radiological surveying tailored to the needs for calculations; Technical planning including selection of techniques to be used; Identification of potential sources for systematic deviations. In the case of the interim store, some of the sources of uncertainty are as follows: Damaged surface layers in the pools; Maintenance status for the

  20. Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts-An Interim Process Evaluation.

    Science.gov (United States)

    Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Dunford, Elizabeth K; Wu, Jason H Y; Neal, Bruce

    2017-10-17

    The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention ( n = 22) or control ( n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies ( p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government's Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods.

  1. ACR: Licensing and design readiness

    International Nuclear Information System (INIS)

    Alizadeh, A.

    2009-01-01

    Full text The Canadian nuclear technology has a long history dating back to the 1940s. In this regard, Canada is in a unique situation, shared only by a very few countries, where original nuclear power technology has been invented and further developed. Canadian Nuclear Safety Commission (CNSC), then called AECB, was established in 1946. CNSC focuses on nuclear security, nuclear safety, establishing health and safety regulations, and has also played an instrumental role in the formation of the IAEA. CNSC has provided assistance to the establishment of regulatory authorities in AECL's client countries such as Korea, Argentina, China and Romania. AECL has developed the Gen III+ ACR 1000 as evolutionary advancement of the current CANDU 6 reactor. ACR-1000 has evolved from AECL's in depth experience with CANDU systems, components, and materials, as well as the feedback received from owners and operators of CANDU plants. The ACR-1000 design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance. ACR-1000 has completed its Basic Engineering, has advanced in the licensing process in Canada, and is ready for deployment in Canadian and world markets. EC6 is an evolution of CANDU 6 and is a Gen III natural uranium fuelled reactor. Its medium size and potential for fuel localization and advanced fuel cycles is an optimal strategic solution in many markets.AECL's reactor products are shown to be compliant with a variety of licensing and regulatory requirements. These include the new CNSC DRD-337, IAEA NS-R1, and EUR. This allows the countries interested in CANDU reactor products to be confident of its licensing in their own regulatory regimes.

  2. Intrinsic bioremediation of landfills interim report

    International Nuclear Information System (INIS)

    Brigmon, R.L.; Fliermans, C.B.

    1997-01-01

    Intrinsic bioremediation is a risk management option that relies on natural biological and physical processes to contain the spread of contamination from a source. Evidence is presented in this report that intrinsic bioremediation is occurring at the Sanitary Landfill is fundamental to support incorportion into a Corrective Action Plan (CAP)

  3. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ... Federal, State, and local agencies, and the South Florida Ecosystem Restoration Task Force, execute an... modeling; information developed through the assessment principles contained in the Plan; and future... hydrologic performance targets, improvements in water quality, and anticipated ecological responses for areas...

  4. Intrinsic bioremediation of landfills interim report

    Energy Technology Data Exchange (ETDEWEB)

    Brigmon, R.L. [Westinghouse Savannah River Company, Aiken, SC (United States); Fliermans, C.B.

    1997-07-14

    Intrinsic bioremediation is a risk management option that relies on natural biological and physical processes to contain the spread of contamination from a source. Evidence is presented in this report that intrinsic bioremediation is occurring at the Sanitary Landfill is fundamental to support incorportion into a Corrective Action Plan (CAP).

  5. Agro 13 No 3 Ready

    African Journals Online (AJOL)

    The value chain for Moringa product, if properly developed, offers considerable investment opportunities .... blender, fertilizer, herbicide, seedling planting, Planning and management (logistic), Risk management ..... leave market, demand and supply elasticities and requirements for growth which should be in line with any ...

  6. Determining transition readiness in congenital heart disease: Assessing the utility of the Transition Readiness Questionnaire

    Science.gov (United States)

    The Transition Readiness Assessment Questionnaire (TRAQ) is a tool commonly used to assess transition readiness in adolescents with chronic diseases. It was previously validated in youth with special health care needs (YSHCN), but no patients with congenital heart disease (CHD) were included in the ...

  7. Readiness for self-directed learning and academic performance in an abilities laboratory course.

    Science.gov (United States)

    Deyo, Zachariah M; Huynh, Donna; Rochester, Charmaine; Sturpe, Deborah A; Kiser, Katie

    2011-03-10

    To assess the relationship between readiness for self-directed learning, academic performance on self-directed learning activities, and resources used to prepare for an abilities laboratory course. The Self-directed Learning Readiness Scale (SDLRS) was administered to first-year (P1) doctor of pharmacy (PharmD) candidates at the University of Maryland. Additional data collected included final course grades, quiz scores, resources used to prepare for laboratory activities, and demographics. The mean SDLRS score was 148.6 ± 13.8. Sixty-eight students (44%) scored > 150, indicating a high readiness for self-directed learning. These students were more likely to complete assignments before the laboratory, meet in study groups, and report postgraduation plans to enter noncommunity pharmacy. No significant association was found between academic performance and the SDLRS. Readiness for self-directed learning is associated with self-directed learning habits, but may not be necessary for learning foundational knowledge, provided students are given specific instructions on what to study. Whether high readiness for self-directed learning is necessary for more complex learning or for self-identification of learning needs is unknown.

  8. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    International Nuclear Information System (INIS)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  9. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives. (JGB)

  10. Solar Ready Vets Curriculum Design

    Energy Technology Data Exchange (ETDEWEB)

    Dalstrom, Tenley

    2017-08-31

    The 5-week SRV program includes four sets of program learning goals aligned around (1) the NABCEP Entry Level body of knowledge; (2) gaining hands-on experience with solar system site analysis, design, installation, commissioning, operation, maintenance and financial considerations; (3) Safety issues unique to solar + OSHA 30; (4) Transition planning and individual support of entry into the solar industry. These goals, and the learning objectives associate with each, are pursued in parallel during the course.

  11. LLNL line-item construction projects Master Site Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-15

    This interim submittal is an updated 1996 overview of the Master Plan based on the 1995 LLNL Site Development Plan, illustrating the future land use considerations, and the locations of proposed facilities as documented through the line item development process and keyed to the summary table. The following components in addition to the line-item proposals remain key elements in the implementation strategy of the Master Plan: personnel migration, revitalization, space reduction, classified core contraction, utility systems, and environmental restoration.

  12. Operational Readiness Review Final Report For F-Canyon Restart. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    McFarlane, A.F.; Spangler, J.B.

    1995-04-05

    An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH& QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment.

  13. Operational Readiness Review Final Report For F-Canyon Restart. Phase 1

    International Nuclear Information System (INIS)

    McFarlane, A.F.; Spangler, J.B.

    1995-01-01

    An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH ampersand QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment

  14. Solar sail-solar electric technology readiness and transfer assessment

    Science.gov (United States)

    Chase, R. L.

    1977-01-01

    A method of conducting a technology readiness assessment was developed. It uses existing OAST technology readiness and risk criteria to define a technology readiness factor that considers both the required gain in technology readiness level to achieved technology readiness plus the degree of effort associated with achieving the gain. The results indicate that Solar Electric Propulsion is preferred based on technology readiness criteria. Both Solar Sail and Solar Electric Propulsion have a high level of transfer potential for future NASA missions, and each has considerable technology spillover for non-NASA applications.

  15. Ready for kindergarten: Are intelligence skills enough?

    Directory of Open Access Journals (Sweden)

    Caroline Fitzpatrick

    2017-12-01

    Full Text Available This study investigated how different profiles of kindergarten readiness in terms of student intellectual ability, academic skills and classroom engagement relate to future academic performance. Participants are French-Canadian children followed in the context of the Quebec Longitudinal Study of Child Development (N = 670. Trained examiners measured number knowledge, receptive vocabulary and fluid intelligence when children were in kindergarten. Teachers rated kindergarten classroom engagement. Outcomes included fourth-grade teacherrated achievement and directly assessed mathematical skills. Latent class analyses revealed three kindergarten readiness profiles: high (57%, moderate (34% and low (9.3% readiness. Using multiple regression, we found that a more favourable kindergarten profile predicted better fourth-grade academic performance. Identifying children at risk of academic difficulty is an important step for preventing underachievement and dropout. These results suggest the importance of promoting a variety of cognitive, academic and behavioural skills to enhance later achievement in at-risk learners.

  16. Ready for the World: preparing nursing students for tomorrow.

    Science.gov (United States)

    Callen, Bonnie L; Lee, Jan L

    2009-01-01

    In 2004, a 5-year plan of international and intercultural education was developed by the University of Tennessee, Knoxville (UTK) to help students become ready for the changing world in which they will live. This program is called "Ready for the World." The University of Tennessee College of Nursing in Knoxville has integrated many of the suggestions from this program into the undergraduate nursing curriculum to prepare students for the world by making the world their classroom. Intercultural learning includes both a solid base of knowledge obtained in the classroom and multiple experiences that involve cultural interaction. Experiences begin on UTK's diverse campus and expand to the surrounding city of Knoxville, including interactions with vulnerable populations such as the homeless or elderly persons, then to nearby Appalachian communities, and on to Central America. Many of these experiences are offered for credit in the Community Health Nursing or the Transcultural Nursing courses. The knowledge nursing students acquire and their varied experiences will help them gain cultural competence for their future nursing practice.

  17. Interim safety basis compliance matrix for Trenches 31 and 34

    International Nuclear Information System (INIS)

    Ames, R.R.

    1994-01-01

    The tables provided in this document identify the specific requirements and basis for the administrative controls established in the Westinghouse Hanford Company (WHC) Solid Waste Burial Ground (SWBG) Interim Safety Basis (ISB) for operation of the Project W-025, Mixed Waste Lined Landfill (Trenches 31 and 34). The tables document the necessary controls and implementing procedures to ensure compliance with the requirements of the ISB. These requirements provide a basis for future Unreviewed Safety Questions (USQ) screening of applicable procedure changes, proposed physical modifications, tests, experiments, and occurrences. Table 1 provides the SWBG interim Operational Safety Requirements administrative controls matrix. The specific assumptions and commitments used in the safety analysis documents applicable to disposal of mixed wastes in Trenches 31 and 34 are provided in Table 2. Table 3 is provided to document the potential engineered and administrative mitigating features identified in the Preliminary Hazard Analysis (PHA) for disposal of mixed waste

  18. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  19. Rehabilitation of failing dentition with interim immediate denture prosthesis

    Directory of Open Access Journals (Sweden)

    Amit Sharma

    2016-01-01

    Full Text Available Advances in therapy have helped patients with periodontal disease to retain part of their natural dentition for an extended period. These patients can be well served by properly designed removable partial dentures. For the patient facing the loss of all his/her remaining natural teeth, there are three treatment options. One is for the patient to have all remaining teeth extracted and wait for 6–8 weeks for the extraction sites to heal. The conventional complete denture is made following healing, leaving the patient without teeth not only during the healing phase but also during the time required for the fabrication of the conventional complete denture. A second option is to convert an existing removable partial denture into an interim immediate complete denture. A third option is to make a conventional immediate complete denture. The aim of this clinical report was to describe the fabrication of interim immediate denture in a patient with hopeless existing dentition.

  20. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  1. eHealth readiness of dietitians.

    Science.gov (United States)

    Maunder, K; Walton, K; Williams, P; Ferguson, M; Beck, E

    2018-02-23

    The present study aimed to determine the eHealth readiness and changes over time of dietitians in Australia. Two cross-sectional analyses of Australian dietitians were conducted in 2013 and 2016, using a survey adapted from one conducted in 2011 by the US Academy of Nutrition and Dietetics. The survey encompassed 30 questions on eHealth readiness across five dimensions: access, standards, attitude, aptitude and advocacy. Descriptive statistics, independent t-tests, chi-squared tests and Z-tests were computed to compare responses from the 2013 and 2016 surveys. The survey completion rate represented 14.5% (747) of the Dietitians Association of Australia members in 2013 and 8% (417) in 2016. The survey responses in relation to access and standards suggest that dietitians are well positioned for eHealth. For attitude and aptitude, there is a moderate level of preparedness, with minor improvements over time. Although showing significant improvement (P readiness for eHealth, although they rate poorly with respect to advocacy readiness. It was concluded that dietitians are not yet ready, and also that valuable opportunities to achieve the benefits that eHealth can deliver will be missed, if dietitians do not take the lead in guiding the development, selection and implementation of nutrition-related technologies. Strengthening the dimension of advocacy and ensuring collaboration across the profession, drawing on the varying expertise demonstrated across the practice areas and by the different generations, will be central to improving dietitian eHealth readiness. © 2018 The British Dietetic Association Ltd.

  2. 105-H Reactor Interim Safe Storage Project Final Report

    International Nuclear Information System (INIS)

    Ison, E.G.

    2008-01-01

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D and D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  3. Gender Issues and Social Science Education - An Interim Report

    OpenAIRE

    Mechthild Oechsle; Karin Wetterau

    2005-01-01

    This article discusses the relevance of gender issues for social science education and gives an interim report on developments in the field. We explore the significance of gender differences in political attitudes and preferences for certain topics of instruction, consider differences in the learning needs of male and female students, and analyse the curricular challenges involved in incorporating the gender perspective in the classroom. Deficits in the curricular coverage of gender issues re...

  4. In vitro resistance of reinforced interim fixed partial dentures.

    Science.gov (United States)

    Pfeiffer, Peter; Grube, Lars

    2003-02-01

    Comprehensive restorative dental treatment often necessitates the use of interim fixed partial dentures (FPDs) with high stiffness, especially in long-span restorations or areas of heavy occlusal stress. This in vitro study evaluated the fracture load of interim FPDs made with various materials and span lengths. Groups (n = 3) of interim FPDs were fabricated with prosthodontic resin materials on 2 abutments with 3 different pontic widths of 3 units (12 mm), 4 units (19 mm), and 5 units (30 mm). The following materials were tested: (1) a thermoplastic polymer (Promysan Star), (2) Promysan Star with a veneering composite (Vita Zeta), (3) a nonimpregnated polyethylene fiber reinforced resin (Ribbond) with a veneering composite (Sinfony), (4) an impregnated fiber reinforced composite system (Targis/Vectris), and (5) a conventional polymethyl methacrylate, Biodent K+B, (control group). After 5000 thermocycles in 2 water baths at 5 degrees and 55 degrees C, the FPDs were temporarily fixed with a provisional cement on the corresponding abutments and subjected to 3-point bending until fracture by a universal testing machine. Statistical analysis consisted of an analysis of variance (ANOVA, 1-way, 2-way) and Bonferroni-Dunn's multiple comparisons post hoc analysis for test groups (alpha = .05). Fracture resistance (N) differed significantly for 3 (mean: 640 +/- 146 N), 4 (626 +/- 229 N), and 5 unit (658 +/- 98 N) Targis/Vectris FPDs compared with the corresponding Promysan (284 +/- 21 N to 125 +/- 73 N), Biodent K+B (247 +/- 91 N to 218 +/- 85 N), and Promysan/Vita Zeta (95 +/- 15 N to 82 +/- 6 N) groups (P < .05). Significant differences were obtained for the 4 and 5 unit Targis/Vectris FPDs compared with the Sinfony/Ribbond FPDs (281 +/- 25 N - 252 +/- 74 N) for the corresponding pontic spans. Within the limitations of this in vitro study the impregnated fiber reinforcement may considerably enhanced the fracture resistance of interim FPDs of different span lengths.

  5. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  6. 105-H Reactor Interim Safe Storage Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    E.G. Ison

    2008-11-08

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  7. Fluoride ion release and solubility of fluoride enriched interim cements.

    Science.gov (United States)

    Lewinstein, Israel; Block, Jonathan; Melamed, Guy; Dolev, Eran; Matalon, Shlomo; Ormianer, Zeev

    2014-08-01

    Interim and definitive restorations cemented with interim cements for a prolonged interval are susceptible to bacterial infiltration and caries formation. The purpose of this in vitro study was to evaluate the long-term fluoride release and solubility of aged ZnO-based interim cements enriched separately with 0.4% NaF and SnF2. Four different brands of cements (Tempbond, Tempbond NE, Procem, and Freegenol) were tested for fluoride release and solubility. For every test, 6 disk specimens of each cement with NaF and SnF2, and 6 with no fluoride enrichment (control) were fabricated, for a total of 72 specimens. The disks were incubated in deionized water. Fluoride ion release was recorded at 1, 7, 14, 21, 63, 91, and 182 days. Solubility was calculated as weight percent after 90 days of incubation. The data were analyzed by analysis of variance with repeated measures and the Tukey honestly significant difference post hoc test (Pfluorides released fluoride ions for at least 182 days. Cements mixed with NaF released more fluoride ions than those mixed with SnF2 (P.97), indicating a diffusion-controlled fluoride release. Cement and fluoride types were the main affecting factors in fluoride ion release. The addition of fluorides slightly increased the solubility of the cements. Given their long-term sustained and diffusive controlled release, these fluorides, particularly NaF when mixed with ZnO-based interim cements, may be useful for caries prevention under provisionally cemented restorations. Copyright © 2014 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  8. Interim dry storage system technologies and innovations VARNA 2002

    International Nuclear Information System (INIS)

    Chollet, P.; Guenon, Y.

    2002-01-01

    The main concepts of the TN24 Family and NUHOMS System are explained in the paper. It is discussed how the NPPs specific requirements and economics trends contributes to the growing families of interim dry storage systems delivered under COGEMA LOGICTICS license. It is concluded that modular solutions are currently dominating because they are derived from main concepts evolved over time, benefited from both the transport aspects with internationally recognised stringent regulations, and various specific ISFSI requirements and economic trends

  9. Waste Encapsulation and Storage Facility interim operational safety requirements

    CERN Document Server

    Covey, L I

    2000-01-01

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  10. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  11. The development of an online decision support tool for organizational readiness for change.

    Science.gov (United States)

    Khan, Sobia; Timmings, Caitlyn; Moore, Julia E; Marquez, Christine; Pyka, Kasha; Gheihman, Galina; Straus, Sharon E

    2014-05-10

    readiness for change assessments in their settings when planning for implementation. This, in turn, may contribute to more successful implementation outcomes. We will test this tool in a future study to determine its efficacy and impact on implementation processes.

  12. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  13. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  14. Discharge planning for children with ventricular septal defect and pulmonary arterial hypertension in China

    Directory of Open Access Journals (Sweden)

    Xiaoxiao Wu

    2015-06-01

    Conclusions: Discharge planning improves the maternal discharge readiness, maternal caring knowledge and maternal caring behaviors. However, this planning did not reduce the readmission rate of children with CHD-PAH.

  15. Physical Readiness Testing of Surface Warfare Officers

    Science.gov (United States)

    1991-06-01

    NA% I PHISICAL READIiESS TEST (PRT QUEST1OthAIRE I. hE ARE CONDUCTI NG THESIS RESEAR H 0N HO- ELL THE PRT SUPPORT5 TNE R 0 T i E 0F St RF AC E ’ARAR...AD-A245 519 NAVAL POSTGRADUATE SCHOOL Monterey, California DTIC CTE.EC a% FEB071992 CI THESIS Physical Readiness Testing of Surface Warfare Officers...READINESS TESTING OF SURFACE WARFARE OFFICERS 12. PERSONAL AUTHOR(S) Hatch, William D. II and Swinney, Lori D. 13a. TYPE OF REPORT 13b. TIME COVERED 14

  16. Validating Acquisition IS Integration Readiness with Drills

    DEFF Research Database (Denmark)

    Wynne, Peter J.

    2017-01-01

    To companies, mergers and acquisitions are important strategic tools, yet they often fail to deliver their expected value. Studies have shown the integration of information systems is a significant roadblock to the realisation of acquisition benefits, and for an IT department to be ready to integ......To companies, mergers and acquisitions are important strategic tools, yet they often fail to deliver their expected value. Studies have shown the integration of information systems is a significant roadblock to the realisation of acquisition benefits, and for an IT department to be ready...

  17. Are students ready for meaningful use?

    Science.gov (United States)

    Ferenchick, Gary S; Solomon, David; Mohmand, Asad; Towfiq, Basim; Kavanaugh, Kevin; Warbasse, Larry; Addison, James; Chames, Frances

    2013-01-01

    Background The meaningful use (MU) of electronic medical records (EMRs) is being implemented in three stages. Key objectives of stage one include electronic analysis of data entered into structured fields, using decision-support tools (e.g., checking drug-drug interactions [DDI]) and electronic information exchange. Objective The authors assessed the performance of medical students on 10 stage-one MU tasks and measured the correlation between students' MU performance and subsequent end-of-clerkship professionalism assessments and their grades on an end-of-year objective structured clinical examination. Participants Two-hundred and twenty-two third-year medical students on the internal medicine (IM) clerkship. Design/main measures From July 2010 to February 2012, all students viewed 15 online tutorials covering MU competencies. The authors measured student MU documentation and performance in the chart of a virtual patient using a fully functional training EMR. Specific MU measurements included, adding: a new problem, a new medication, an advanced directive, smoking status, the results of screening tests; and performing a DDI (in which a major interaction was probable), and communicating a plan for this interaction. Key results A total of 130 MU errors were identified. Sixty-eight (30.6%) students had at least one error, and 30 (13.5%) had more than one (range 2-6). Of the 130 errors, 90 (69.2%) were errors in structured data entry. Errors occurred in medication dosing and instructions (18%), DDI identification (12%), documenting smoking status (15%), and colonoscopy results (23%). Students with MU errors demonstrated poorer performance on end-of-clerkship professionalism assessments (r =-0.112, p=0.048) and lower observed structured clinical examination (OSCE) history-taking skills (r =-0.165, p=0.008) and communication scores (r= - 0.173, p=0.006). Conclusions MU errors among medical students are common and correlate with subsequent poor performance in multiple

  18. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  19. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  20. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  1. Effect of polyester fiber reinforcement on the mechanical properties of interim fixed partial dentures

    OpenAIRE

    Gopichander, N.; Halini Kumarai, K.V.; Vasanthakumar, M.

    2015-01-01

    Background: Different reinforcements currently available for interim fixed partial denture (FPD) materials do not provide the ideal strength for long-term use. Therefore, the aim of this investigation was to develop a more ideal provisional material for long-term use with better mechanical properties. This study evaluated the effectiveness of polyester fiber reinforcement on different interim FPD materials. Methods: Thirty resin-bonded FPDs were constructed from three provisional interim F...

  2. Interim policy on establishment and operation of internet open, anonymous information servers and services

    OpenAIRE

    Acting Dean of Computer and Information Services

    1995-01-01

    Purpose. To establish interim NPS general policy regarding establishment and operation of Open, Anonymous Information Servers and Services, such as World Wide Web (http), Gopher, Anonymous FTP, etc...

  3. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1995-08-01

    This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

  4. A Proposed Conceptual Model of Military Medical Readiness

    National Research Council Canada - National Science Library

    Van Hall, Brian M

    2007-01-01

    .... The purpose of this research is to consolidate existing literature on the latent variable of medical readiness, and to propose a composite theoretical model of medical readiness that may provide...

  5. Individual Ready Reserve: It's Relevance in Supporting the Long War

    National Research Council Canada - National Science Library

    Chisholm, Shelley A

    2008-01-01

    ... in sustaining personnel readiness while supporting on going operations. In response to meeting these personnel readiness concerns, the Army Reserve will require the call-up of Soldiers currently serving in the IRR...

  6. Organization Readiness and ERP Implementation in Albaha University

    Science.gov (United States)

    Alaqeel, K.; Shakkah, M. S.; Rahmat, R. F.; Alfageeh, A.; Budiarto, R.

    2017-04-01

    This work studies the correlation between the organizational readiness in Albaha University and the respective Critical Success Factors with regards to the Enterprise Resource Planning (ERP) implementation. The study also considers some suggestions to improve the ABU’s ERP systems and roadmap towards the self -development strategy and to reduce vendor-dependency. A survey regarding ERP to the end-users, experts and developers in Albaha University was conducted. The analysis of the results in this work confirmed with the results of an existing work. The four significance success factors: Project Management, Business Process Re-engineering, System Integration, and Training and Education are recommended to be adopted to assure the smooth adoption of ERP at Albaha University.

  7. Preparing your practice for EMR: are you ready?

    Science.gov (United States)

    McGrath, Debra

    2006-01-01

    Practices considering an EMR system purchase and implementation must first consider if the practice is ready to undertake a project of this size and magnitude, with such far-reaching implications for the organization. Before considering EMR, an evaluation of the existing PM system is in order. Incorporating an EMR system when the PM system is inadequate decreases ROI, minimizes the efficiencies gained through EMR and ultimately may not support the long-term goals of the practice. The first step for any group or solo medical practice is to understand itself: what are the practice's goals; where will the practice be in terms of maturity, market share, and community presence in five or 10 years; what are the requirements for a system to support the needs and goals of the practice? Understanding each of these aspects improves the negotiating strength of the practice, ensures a successful implementation plan, and decreases the time to return on objective and subsequent ROI.

  8. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  9. Dental insurance! Are we ready?

    Directory of Open Access Journals (Sweden)

    Ravi SS Toor

    2011-01-01

    Full Text Available Dental insurance is insurance designed to pay the costs associated with dental care. The Foreign Direct Investment (FDI bill which was put forward in the winter session of the Lok Sabha (2008 focused on increasing the foreign investment share from the existing 26% to 49% in the insurance companies of India. This will allow the multibillion dollar international insurance companies to enter the Indian market and subsequently cover all aspects of insurance in India. Dental insurance will be an integral a part of this system. Dental insurance is a new concept in Southeast Asia as very few countries in Southeast Asia cover this aspect of insurance. It is important that the dentists in India should be acquainted with the different types of plans these companies are going to offer and about a new relationship which is going to emerge in the coming years between dentist, patient and the insurance company.

  10. Emotional Readiness and Music Therapeutic Activities

    Science.gov (United States)

    Drossinou-Korea, Maria; Fragkouli, Aspasia

    2016-01-01

    The purpose of this study is to understand the children's expression with verbal and nonverbal communication in the Autistic spectrum. We study the emotional readiness and the music therapeutic activities which exploit the elements of music. The method followed focused on the research field of special needs education. Assumptions on the parameters…

  11. Child Physical Punishment, Parenting, and School Readiness

    Science.gov (United States)

    Weegar, Kelly; Guérin-Marion, Camille; Fréchette, Sabrina; Romano, Elisa

    2018-01-01

    This study explored how physical punishment (PP) and other parenting approaches may predict school readiness outcomes. By using the Canada-wide representative data, 5,513 children were followed over a 2-year period. Caregivers reported on their use of PP and other parenting approaches (i.e., literacy and learning activities and other disciplinary…

  12. Development toward School Readiness: A Holistic Model

    Science.gov (United States)

    Gaynor, Alan Kibbe

    2015-01-01

    A systemic analysis of early childhood development factors explains the variance in school readiness among representative U.S. 5-year-olds. The underlying theory incorporates a set of causally interactive endogenous variables that are hypothesized to be driven by the effects of three exogenous variables: parental education, immigrant status and…

  13. Career Readiness: Are We There Yet?

    Science.gov (United States)

    Guidry, Christopher

    2012-01-01

    ACT is committed to working with career and technical educators in order to prepare students to meet the standards of the high-performance workplace. In short, prepare them to be career- and job-ready. This commitment is a reflection of ACT's mission: "helping people achieve education and workplace success." After devoting more than two decades of…

  14. Ready Texas: Stakeholder Convening. Proceedings Report

    Science.gov (United States)

    Intercultural Development Research Association, 2016

    2016-01-01

    With the adoption of substantial changes to Texas high school curricula in 2013 (HB5), a central question for Texas policymakers, education and business leaders, families, and students is whether and how HB5 implementation impacts the state of college readiness and success in Texas. Comprehensive research is needed to understand the implications…

  15. Service Availability and Readiness Assessment of Maternal ...

    African Journals Online (AJOL)

    AJRH Managing Editor

    Keywords: Madagascar, Maternal and Child health services, Service availability and readiness assessment, Public health facilities. Résumé ..... Table 2: Percentage of Health Facilities Equipped with Tracer Items for Antenatal Care Services Among Facilities. Providing this ... 32 CSBs, due to its location in a tourist area.

  16. Community College Students' Perceptions of Academic Readiness

    Science.gov (United States)

    Millar, Bradbury Stewart

    2010-01-01

    This study compares community college students' perceptions of their academic readiness before and after they participated in community college coursework. Students enroll in community colleges for many reasons but many drop-out before reaching their goals. High rates of attrition suggest that students may not accurately assess their levels of…

  17. College and Career Readiness in Elementary Schools

    Science.gov (United States)

    Pulliam, Nicole; Bartek, Samantha

    2018-01-01

    This conceptual article will provide an in-depth exploration of the relevant literature focused on college and career readiness interventions in elementary schools. Beginning with a theoretical framework, a rationale is provided for early intervention by elementary school counselors. While professional guidelines and standards exist supporting…

  18. Readiness for banking technologies in developing countries

    African Journals Online (AJOL)

    Are customers who have a higher perceived desirability of using technological .... low-income people. Hypothesis development. 1Before it is possible to determine the relationship between technology readiness and key demographics ... not possible to draw a random sample of respondents from the target population.

  19. Birth Preparedness and Complication Readiness of Pregnant ...

    African Journals Online (AJOL)

    Birth Preparedness and Complication Readiness of Pregnant Women Attending the Three Levels of Health Facilities in Ife Central Local Government, Nigeria. ... Only 24 (6.0%) had adequate knowledge of obstetric danger signs without prompting. Three hundred and forty (84.8%) and 312 (78.3%) women respectively had ...

  20. A selective laser sintering prototype guide used to fabricate immediate interim fixed complete arch prostheses in flapless dental implant surgery: Technique description and clinical results.

    Science.gov (United States)

    Di Giacomo, Giovanni de A P; Cury, Patricia R; da Silva, Airton M; da Silva, Jorge V L; Ajzen, Sergio A

    2016-12-01

    Extensive occlusal adjustments and misfit of the prosthesis to prosthetic components are frequent problems related to fixed interim prosthesis fabrication with immediate dental implant loading. The purpose of this clinical trial was to evaluate a prosthetic guide made with a rapid prototype model based on virtual surgical planning. This prosthetic guide was used to fabricate fixed interim prostheses that would allow immediate implant loading after computer-guided implant installation. Nine interim prostheses were made for 9 participants with complete maxillary or mandibular edentulism. The virtual prosthetic guide was planned using computer-assisted design (CAD) software and was fabricated with rapid prototyping equipment (selective laser sintering). The prosthetic guide had 3 portions: the occlusal portion, which had occlusal registration; the connection portion, which had the information of the position and angulation of the abutment/implant projection; and the mucosa portion, which had the registration of the alveolar mucosa architecture. The prosthetic guide was used by a dental technician to fabricate prostheses. A single trained examiner evaluated the passive fit of the interim prostheses, the average time required for installing the interim prosthesis and for occlusal adjustments, the satisfaction of the patient with the prosthesis; and the screws, torque, occlusion, and prosthesis status. Passive fit was achieved between the prosthetic components and prostheses in 7 participants. The average time required for installing the fixed interim prostheses was 64.44 minutes. All participants reported being more pleased with the fixed interim prosthesis than with the prosthesis worn before implant placement. Prosthesis fractures were observed in 3 participants (2 in the maxilla and 1 in the mandible); all fractures occurred 3 months or more after delivery. No further complication was observed during 6 months of follow-up. The prosthetic guide enabled fabrication of

  1. A Study of Fleet Surgical Teams Readiness Posture in Amphibious Readiness Groups

    National Research Council Canada - National Science Library

    Tennyson, Ruby

    2000-01-01

    This thesis describes and evaluates Fleet Surgical Teams (FSTs). It examines how Navy Medicine adapted FSTs to changing support requirements associated with the Total Health Care Support Readiness Requirement (THCSRR...

  2. e-Learning readiness amongst nursing students at the Durban ...

    African Journals Online (AJOL)

    A quasi-experimental study design was employed to assess such readiness in first year nursing students before and after an appropriate educational intervention. A modified Chapnick Readiness Score was used to measure their psychological, equipment and technological readiness for the change in learning method.

  3. Framework for readiness assessment of 3G Mobile ...

    African Journals Online (AJOL)

    SR), engagement readiness (ER) and the non readiness (NR) were used in carrying out this study. The study involved the use of the stakeholders to derive a framework for the 3G readiness assessment in Botswana. The framework included ...

  4. Instructional Alignment of Workplace Readiness Skills in Marketing Education

    Science.gov (United States)

    Martin, Sarah J.; Reed, Philip A.

    2015-01-01

    This study examined high school marketing education teachers' knowledge of workplace readiness skills and whether that knowledge had an impact on student workplace readiness skill achievement. Further, this study examined the usage of Virginia's 13 Workplace Readiness Skills curriculum and identified the teaching methods and instructional…

  5. 75 FR 28594 - Ready-to-Learn Television Program

    Science.gov (United States)

    2010-05-21

    ... DEPARTMENT OF EDUCATION [CFDA Number 84.295A] Ready-to-Learn Television Program AGENCY: Office of... FR 13515) a notice inviting applications for new awards for FY 2010 for the Ready-to-Learn Television... INFORMATION CONTACT: The Ready-to-Learn Television Program, U.S. Department of Education, 400 Maryland Avenue...

  6. 75 FR 18170 - Ready-to-Learn Television Program

    Science.gov (United States)

    2010-04-09

    ... DEPARTMENT OF EDUCATION [CFDA Number 84.295A] Ready-to-Learn Television Program AGENCY: Office of... FR 13515) a notice inviting applications for new awards for FY 2010 for the Ready-to-Learn Television...'' with the date ``April 15, 2010.'' FOR FURTHER INFORMATION CONTACT: The Ready-to-Learn Television...

  7. 75 FR 16763 - Ready-to-Learn Television Program

    Science.gov (United States)

    2010-04-02

    ... DEPARTMENT OF EDUCATION [CFDA Number 84.295A] Ready-to-Learn Television Program AGENCY: Office of... FR 13515) a notice inviting applications for new awards for FY 2010 for the Ready-to-Learn Television...'' with the date ``April 15, 2010.'' FOR FURTHER INFORMATION CONTACT: The Ready-to-Learn Television...

  8. Diagnostics of children's school readiness in scientific studies abroad

    Directory of Open Access Journals (Sweden)

    Nazarenko V.V.

    2012-06-01

    Full Text Available The article considers the problem of children's school readiness as it is represented in contemporary studies of foreign scholars. It displays a variety of approaches to estimation of school readiness as well as the ways of measuring the levels of child development as relating to school readiness, namely those of them which are in common practice in education.

  9. Change Readiness Factors influencing employees’ readiness for change within an organisation : A systematic review

    OpenAIRE

    Riddell, Rebecca Victoria; Røisland, Maren Tofte

    2017-01-01

    Master's thesis Business Administration BE501 - University of Agder 2017 External and internal factors are constantly forcing organisations to change; in order for organisations to survive and change successfully it is crucial to respond quickly. Readiness for change and actions undertaken in the implementation of change serve as key constructs for the success of a change effort. Readiness for change is well known as a tool for decreasing resistance to change, but exactly what factors will...

  10. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.

  11. New Hampshire Better Buildings - Final Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Cramton, Karen [NH Office of Energy and Planning; Peters, Katherine

    2014-02-20

    With $10 million in funding from the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program, the NH Better Buildings program was established as an initiative that initially empowered the three “Beacon Communities” of Berlin, Nashua and Plymouth to achieve transformative energy savings and reductions in fossil fuel use and greenhouse gases through deep energy retrofits and complementary sustainable energy solutions. The program also enabled those Communities to provide leadership to other communities around the state as “beacons” of energy efficiency. The goal of the program was to reduce energy use by a minimum of 15% through energy efficiency upgrades in residential and commercial buildings in the communities. The program expanded statewide in April 2012 by issuing a competitive solicitation for additional commercial projects non-profit, and municipal energy efficiency projects from any community in the state, and a partnership with the state’s utility-run, ratepayer-funded residential Home Performance with ENERGY STAR® (HPwES) program. The NH Better Buildings program was administered by the New Hampshire Office of Energy and Planning (OEP) and managed by the NH Community Development Finance Authority (CDFA). The program started in July 2010 and the last projects funded with American Reinvestment and Recovery Act (ARRA) funds were completed in August 2013. The program will continue after the American Recovery and Reinvestment Act program period as a Revolving Loan Fund, enabling low-interest financing for deep energy retrofits into the future.

  12. Implementation of the TsunamiReady Supporter Program in Puerto Rico

    Science.gov (United States)

    Flores Hots, V. E.; Vanacore, E. A.; Gonzalez Ruiz, W.; Gomez, G.

    2016-12-01

    The Puerto Rico Seismic Network (PRSN) manages the PR Tsunami Program (NTHMP), including the TsunamiReady Supporter Program. Through this program the PRSN helps private organizations, businesses, facilities or local government entities to willingly engage in tsunami planning and preparedness that meet some requirements established by the National Weather Service. TsunamiReady Supporter organizations are better prepared to respond to a tsunami emergency, developing a response plan (using a template that PRSN developed and provides), and reinforcing their communication systems including NOAA radio, RSS, and loud speakers to receive and disseminate the alerts issued by the NWS and the Tsunami Warning Centers (TWC). The planning and the communication systems added to the training that PRSN provides to the staff and employees, are intend to help visitors and employees evacuate the tsunami hazard zone to the nearest assembly point minimizing loss of life. Potential TsunamiReady Supporters include, but are not limited to, businesses, schools, churches, hospitals, malls, utilities, museums, beaches, and harbors. However, the traditional targets for such programs are primarily tourism sites and hotels where people unaware of the tsunami hazard may be present. In 2016 the Tsunami Ready Program guided four businesses to achieve the TsunamiReady Supporter recognition. Two facilities were hotels near or inside the evacuation zone. The other facilities were the first and only health center and supermarket to be recognized in the United States and US territories. Based on the experience of preparing the health center and supermarket sites, here we present two case studies of how the TsunamiReady Supporter Program can be applied to non-traditional facilities as well as how the application of this program to such facilities can improve tsunami hazard mitigation. Currently, we are working on expanding the application of this program to non-traditional facilities by working with a

  13. Comparative study of marginal adaptation and mechanical properties of CAD/CAM versus dual polymerized interim fixed dental prosthesis

    Directory of Open Access Journals (Sweden)

    Marwa Eltayeb I Elagra

    2014-01-01

    Conclusions: CAD/CAM fabricated interim restorations have better marginal adaptation, wear resistance and fracture resistance than dual polymerized interim restorations hence, might withstand longer duration in the oral cavity.

  14. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  15. Career readiness and externalizing behaviors of children affected by maternal HIV/AIDS: 15-year outcomes of the PACT study

    Science.gov (United States)

    Murphy, Debra A.; Marelich, William D.; Herbeck, Diane M.; Cook, Mekeila

    2017-01-01

    The purpose of this 15-year longitudinal study was to assess the effects of maternal HIV/AIDS on child/adolescent career readiness and externalizing behaviors. Interviews were conducted with 66 pairs of healthy children and their mothers living with HIV/AIDS (MLH), who are participants in the Parents And children Coping Together (PACT) project begun in 1997. All study participants were English or Spanish speaking. About half (48.5%) of the youth were female. Maternal health status (e.g., viral load biomedical marker, illness symptoms, physical functioning and depression) and child/adolescent outcomes (e.g., career readiness, conduct disorder, drug use, sexual behaviors, parent attachment and youth autonomy) were assessed over 20 time-points. Individual growth and GEE logistic regression models showed lower variability in maternal viral load was positively associated with better career readiness and parent attachment among adolescent/young adults. Externalizing behaviors (conduct disorder, alcohol and crystal methamphetamine use) were positively associated with maternal depression. Adolescent coping efficacy was shown to be a protective factor when applied to models on career readiness. Stability in MLH health positively affects children’s career readiness over time, particularly career planning and career choices. The finding that adolescent coping efficacy may act as a protective factor against poor career planning has important implications for developing interventions to assist children in coping with parental HIV. PMID:28983322

  16. Evaluation of groundwater flow and transport at the Shoal underground nuclear test: An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Pohll, G.; Chapman, J.; Hassan, A.; Papelis, C.; Andricevic, R.; Shirley, C.

    1998-07-01

    Since 1962, all United States nuclear tests have been conducted underground. A consequence of this testing has been the deposition of large amounts of radioactive materials in the subsurface, sometimes in direct contact with groundwater. The majority of this testing occurred on the Nevada Test Site, but a limited number of experiments were conducted in other locations. One of these is the subject of this report, the Project Shoal Area (PSA), located about 50 km southeast of Fallon, Nevada. The Shoal test consisted of a 12-kiloton-yield nuclear detonation which occurred on October 26, 1963. Project Shoal was part of studies to enhance seismic detection of underground nuclear tests, in particular, in active earthquake areas. Characterization of groundwater contamination at the Project Shoal Area is being conducted by the US Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) with the State of Nevada Department of Environmental Protection and the US Department of Defense (DOD). This order prescribes a Corrective Action Strategy (Appendix VI), which, as applied to underground nuclear tests, involves preparing a Corrective Action Investigation Plan (CAIP), Corrective Action Decision Document (CADD), Corrective Action Plan, and Closure Report. The scope of the CAIP is flow and transport modeling to establish contaminant boundaries that are protective of human health and the environment. This interim report describes the current status of the flow and transport modeling for the PSA.

  17. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  18. Determinants of readiness to adopt mHealth in a rural community of Bangladesh.

    Science.gov (United States)

    Khatun, Fatema; Heywood, Anita E; Ray, Pradeep K; Hanifi, S M A; Bhuiya, Abbas; Liaw, Siaw-Teng

    2015-10-01

    (aOR 1.8, 95% CI 1.6-2.1), educated respondents (11 years or more education) (aOR 11.1, 95% CI 6.2-19.2) and those belonging to the highest socio-economic group (aOR 3.7, 95% CI 2.9-4.7) were significantly independently associated with knowledge regarding awareness of current mHealth services. We developed a conceptual framework to assess community readiness for mHealth. We described three high level dimensions of readiness and have partially tested the conceptual framework in a rural sub-district in Bangladesh. We found that the community has some technological readiness but inequity was observed for human resource readiness and technological capabilities. The study population is motivated to use mHealth. Our conceptual framework is a promising tool to assist policy-makers in planning and implementing mHealth programs. Copyright © 2015. Published by Elsevier Ireland Ltd.

  19. Readiness for self-directed learning: How bridging and traditional nursing students differs?

    Science.gov (United States)

    Alharbi, Homood A

    2018-02-01

    The dean of the nursing college has an initiative to reform the BSN program in the college to minimize the use of lecturing and maximize interactive and lifelong learning. Appropriate assessment of how our students are prepared to be self-directed learners is crucial. To compare traditional and bridging students in regard to their SDLR scores in the nursing college in Saudi Arabia. This was a comparative study to compare traditional and bridging students in regard to their self-directed learning readiness scores (SDLR). The data was collected at the Nursing College, King Saud University, Riyadh, Saudi Arabia. A convenient sample of undergraduate nursing students at the sixth and eighth levels in both regular and bridging programs were recruited in this study to indicate their SDLR scores. The study used Fisher et al.'s (2001) Self-Directed Learning Readiness Scale to measure the self-directed learning readiness among undergraduate nursing students. The total mean score of SDLR was 144 out of 200, which indicated a low level of readiness for SDL. There were significant variations between the included academic levels among participants. Students in the sixth academic level scored higher in the total SDLR scores compared to eighth-level students. There were no significant variations with gender and program types in the total SDLR scores. A comprehensive plan is needed to prepare both faculty members and students to improve the SDL skills. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  1. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  2. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    Science.gov (United States)

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  3. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    Science.gov (United States)

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  4. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    Science.gov (United States)

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  5. 40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.

    Science.gov (United States)

    2010-07-01

    ... interim detergent program controls and prohibitions. 80.156 Section 80.156 Protection of Environment... Detergent Gasoline § 80.156 Liability for violations of the interim detergent program controls and..., carrier, distributor, reseller, retailer, wholesale purchaser-consumer, oxygenate blender, or detergent...

  6. 40 CFR 80.155 - Interim detergent program controls and prohibitions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent program controls and... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.155 Interim detergent... wholesale purchaser-consumer, and no person shall detergent-additize gasoline, unless such gasoline is...

  7. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-06-02

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  8. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    Energy Technology Data Exchange (ETDEWEB)

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  9. 32 CFR 643.36 - Policy-Interim leasing of excess properties to facilitate economic readjustment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Policy-Interim leasing of excess properties to facilitate economic readjustment. 643.36 Section 643.36 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE Policy § 643.36 Policy—Interim leasing of excess...

  10. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  11. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...

  12. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  13. Miniscrew Supported Interim Tooth Replacement: A Temporary Alternative

    Directory of Open Access Journals (Sweden)

    Gurkeerat Singh

    2012-01-01

    Full Text Available Replacement of congenitally missing anterior tooth poses special problems in growing patients. Because an adolescent is typically self- conscious about removing an appliance and revealing a large edentulous space, a removable single tooth partial denture or retainer is an undesirable option. The temporary anchorage devices are invasive and the best recommended for malocclusion that cannot be effectively managed with conventional mechanics. The use of orthodontic miniscrews for interim restorations before the completion of skeletal growth has been used successfully unlike osseointegrated implants lacking the compensatory growth mechanisms of the natural dentition. The following case reports show an esthetic alternative to temporary tooth replacement using miniscrews.

  14. Hanford low-level tank waste interim performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mann, F.M.

    1997-09-12

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  15. Nondestructive evaluation of creep-fatigue damage: an interim report

    International Nuclear Information System (INIS)

    Nickell, R.E.

    1977-02-01

    In view of the uncertainties involved in designing against creep-fatigue failure and the consequences of such failures in Class 1 nuclear components that operate at elevated temperature, the possibility of intermittent or even continuous non-destructive examination of these components has been considered. In this interim report some preliminary results on magnetic force and ultrasonic evaluation of creep-fatigue damage in an LMFBR steam generator material are presented. These results indicate that the non-destructive evaluation of pure creep damage will be extremely difficult. A set of biaxial creep-fatigue tests that are designed to discriminate between various failure theories is also described

  16. Cost estimation of interim dry storage for Atucha I NPP

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Fuenzalida Troyano, Carlos S.

    2007-01-01

    A joint effort between NASA and CNEA has been performed in order to evaluate and fix the strategy of interim spent fuel storage for Atucha I nuclear power plant. In this work the cost estimation on the proposed system was performed in order to fix the parameter and design criteria for the next engineering step. The main results achieved show that both alternatives are all in the same range of costs per unit of mass to be stored, the impact on electricity cost is less than 1 US mills/KWh and the scaling factor achieved is 0.85. (author) [es

  17. Hospital clinicians' iPad use: an interim report.

    Science.gov (United States)

    Witman, Lydia

    2012-01-01

    An increasing number of hospital libraries are supporting the use of tablet computers such as iPads for access to information resources. To date, this adoption of tablets is not supported by high-quality research evidence. This article provides an interim report on a formal study of clinicians' use of iPads in the hospital setting, currently being conducted at Pennsylvania Hospital in Philadelphia. Other hospital librarians may wish to consider similar factors when beginning to support the use of tablet computers at their own institutions.

  18. Interim report on the TMI-2 purification filter examination

    International Nuclear Information System (INIS)

    Mason, R.E.; Hobbins, R.R.; Cook, B.A.; MacDonald, P.E.

    1983-02-01

    Filters from the purification/makeup system of the Three Mile Island Unit 2 Reactor were examined after the March 28, 1979, accident to determine the character of the debris transported to the filters. The general condition of the filters is presented. Material was removed from the filters and examined. The elemental and radionuclide makeup of the debris is discussed. Distribution of particle size and shape is presentd for some of the material examined. This is an interim report. When the investigation is completed, another report summarizing all of the data will be issued

  19. The PDF4LHC Working Group Interim Report

    CERN Document Server

    Alekhin, Sergey; Ball, Richard D.; Bertone, Valerio; Blumlein, Johannes; Botje, Michiel; Butterworth, Jon; Cerutti, Francesco; Cooper-Sarkar, Amanda; de Roeck, Albert; Del Debbio, Luigi; Feltesse, Joel; Forte, Stefano; Glazov, Alexander; Guffanti, Alberto; Gwenlan, Claire; Huston, Joey; Jimenez-Delgado, Pedro; Lai, Hung-Liang; Latorre, Jose I.; McNulty, Ronan; Nadolsky, Pavel; Olaf Moch, Sven; Pumplin, Jon; Radescu, Voica; Rojo, Juan; Sjostrand, Torbjorn; Stirling, W.J.; Stump, Daniel; Thorne, Robert S.; Ubiali, Maria; Vicini, Alessandro; Watt, Graeme; Yuan, C.-P.

    2011-01-01

    This document is intended as a study of benchmark cross sections at the LHC (at 7 TeV) at NLO using modern parton distribution functions currently available from the 6 PDF fitting groups that have participated in this exercise. It also contains a succinct user guide to the computation of PDFs, uncertainties and correlations using available PDF sets. A companion note, also submitted to the archive, provides an interim summary of the current recommendations of the PDF4LHC working group for the use of parton distribution functions and of PDF uncertainties at the LHC, for cross section and cross section uncertainty calculations.

  20. Hanford low-level tank waste interim performance assessment

    International Nuclear Information System (INIS)

    Mann, F.M.

    1997-01-01

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives