WorldWideScience

Sample records for integration project quarterly

  1. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    Energy Technology Data Exchange (ETDEWEB)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  2. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  3. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  4. Short-term energy outlook. Quarterly projections, first quarter 1995

    International Nuclear Information System (INIS)

    1995-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service

  5. MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number_sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  6. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  7. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  8. Short-term energy outlook: Quarterly projections, Third quarter 1992

    International Nuclear Information System (INIS)

    1992-08-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  9. Short-term energy outlook, quarterly projections, first quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  10. Short-term energy outlook, quarterly projections, second quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  11. Subject Access Project. Third Quarterly Report.

    Science.gov (United States)

    Atherton, Pauline

    This third quarterly report for the period January to March 1977 describes the production schedule, records, and estimated costs and times in creating the Subject Access Project data base. Plans for on-line use of the data base and search strategy design are outlined. A table of specifications for preparing the data base for on-line searching is…

  12. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  13. Short-term energy outlook. Quarterly projections, 2nd quarter 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

  14. quarters

    Directory of Open Access Journals (Sweden)

    Elena Grigoryeva

    2016-10-01

    Full Text Available Are there many words combining both space and time? A quarter is one of such rare words: it means both a part of the city space and a period of the year. A regular city has parts bordered by four streets. For example, Chita is a city with an absolutely orthogonal historical center. This Utopian city was designed by Decembrists in the depth of Siberian ore-mines (120. The 130 Quarter in Irkutsk is irregular from its inception because of its triangular form. Located between two roads, the forked quarter was initially bordered by flows along the west-east axis – the main direction of the country. That is why it appreciated the gift for the 350 anniversary of its transit existence – a promenade for an unhurried flow of pedestrians. The quarter manages this flow quite well, while overcoming the difficulties of new existence and gathering myths (102. Arousing many expectations, the “Irkutsk’s Quarters” project continues the theme that was begun by the 130 Quarter and involved regeneration, revival and search for Genius Loci and the key to each single quarter (74. Beaded on the trading axis, these shabby and unfriendly quarters full of rubbish should be transformed for the good of inhabitants, guests and the small business. The triptych by Lidin, Rappaport and Nevlyutov is about happiness of urbanship and cities for people, too (58. The City Community Forum was also devoted to the urban theme (114. Going through the last quarter of the year, we hope that Irkutsk will keep to the right policy, so that in the near future the wooden downtown quarters will become its pride, and the design, construction and investment complexes will join in desire to increase the number of comfortable and lively quarters in our city. The Baikal Beam will get one more landmark: the Smart School (22 for Irkutsk’s children, including orphans, will be built in several years on the bank of Chertugeevsky Bay.

  15. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  16. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  17. Collaborative Elder Abuse Prevention Project Quarterly Report.

    Science.gov (United States)

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide collaborative elder abuse prevention project, to prevent abuse of elderly and disabled adults. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for…

  18. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  19. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993

  20. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  1. NEPA Project quarterly progress report, April 1--June 30, 1950

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1950-12-31

    Exploration of various types of power plant cycles for nuclear propelled aircraft has been continued during this quarter. The principal current objective of the project is the development of information which will make an intelligent choice of the basic power plant cycle possible. It is still hoped that this choice can be made late in 1950. The survey studies which have been under way for several months continued during the quarter. These consist of analyses and rough preliminary layouts for various types of aircraft, using each of the several basic cycles which have been seriously considered for each of the three phases of development. Although it is still extremely premature to discuss the relative merits of the various cycles, the information so for developed discloses some cycle differences which may, if confirmed by additional work, be significant. In this respect, there have been no recent major changes in the comparative standings of the cycles.

  2. 3rd quarterly report 1976 of the Fast Breeder Project

    International Nuclear Information System (INIS)

    1976-12-01

    The report describes activities which were performed within the framework of the Fast Breeder Project at the Gesellschaft fuer Kernforschung mbH Karlsruhe (GfK) or on behalf of the GfK during the third quarter. It contains contributions on the following subjects: Fuel rod development, material studies and development, corrosion tests and coolant analyses, physical experiments, reactor theory, safety of fast breeders, instrumentation and signal processing for core monitoring, environmental impacts, sodium technology tests, thermo- and fluid-dynamic tests in gas, tests concerning gas-cooled breeders. (HR) [de

  3. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  4. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  5. Minnesota agripower project. Quarterly report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Baloun, J.

    1997-07-01

    The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

  6. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  7. Genomes to life project quarterly report June 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.

    2005-01-01

    This SAND report provides the technical progress through June 2004 of the Sandia-led project, ''Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling'', funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO{sub 2} are important terms in the global environmental response to anthropogenic atmospheric inputs of CO{sub 2} and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes

  8. Basalt waste isolation project. Quarterly report, April 1, 1981-June 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1981-08-01

    This document reports progress made in the Basalt Waste Isolation Project during the third quarter of fiscal year 1981. Efforts are described for the following programs of the project work breakdown structure: systems; waste package; site; repository; regulatory and institutional; test facilities; in situ test facilities.

  9. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  10. Integrated Data Collection Analysis (IDCA) Program — Quarterly Review Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Sandstrom, Mary M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Geoffrey W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Warner, Kirstin F. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Sorensen, Daniel N. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Remmers, Daniel L. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Shelley, Timothy J. [Air Force Research Lab. (AFRL/RXQF), Tyndall AFB, FL (United States); Reyes, Jose A. [Applied Research Associates, Inc., Tyndall AFB, FL (United States); Phillips, Jason J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hsu, Peter C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Reynolds, John G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-12-05

    On November 9 and 10, 2011 the IDCA had the annual quarterly meeting. The meeting started the afternoon of the first day with a tour of the NSWC IHD explosives safety testing and analysis facilities. The meeting on the second day addressed the formal sponsor review and further technical issues for the IDCA. Examination of the IHD equipment during the tour, lead to a long discussion on liquid test methods. The discussion resulted in revision of liquid test methods in the impact test and selection of a new liquid test standard. In addition, modifications to friction, spark and thermal test methods were discussed.

  11. A successful integrated project.

    Science.gov (United States)

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  12. UNFINISHED JOURNEY Project. Quarterly report, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  13. UNFINISHED JOURNEY Project. Quarterly report, September 1994--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  14. UNFINISHED JOURNEY Project. Quarterly report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994 to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  15. Aircraft Nuclear Propulsion Project Quarterly Progress Report for Period Ending December 31, 1956

    Energy Technology Data Exchange (ETDEWEB)

    NA, NA [ORNL

    1957-03-12

    This quarterly progress report of the Aircraft Nuclear Propulsion Project at ORNL records the technical progress of research on circulating-fuel reactors and other ANP research at the Laboratory. The report is divided into five major parts: 1) Aircraft Reactor Engineering, 2) Chemistry, and 3) Metallurgy, 4) Heat Transfer and Physical Properties, Radiation Damage, and Fuel Recovery and Reprocessing, and 5) Reactor Shielding.

  16. Integrated project delivery : The designer as integrator

    NARCIS (Netherlands)

    Wamelink, J.W.F.; Koolwijk, J.S.J.; van Doorn, A.J.

    2012-01-01

    Process innovation related to integrated project delivery is an important topic in the building industry. Studies on process innovation through the use of integrated contracts usually focus on contractors, and particularly on the possibility of forward integration into the building process. Three

  17. Project Integration Architecture

    Science.gov (United States)

    Jones, William Henry

    2008-01-01

    The Project Integration Architecture (PIA) is a distributed, object-oriented, conceptual, software framework for the generation, organization, publication, integration, and consumption of all information involved in any complex technological process in a manner that is intelligible to both computers and humans. In the development of PIA, it was recognized that in order to provide a single computational environment in which all information associated with any given complex technological process could be viewed, reviewed, manipulated, and shared, it is necessary to formulate all the elements of such a process on the most fundamental level. In this formulation, any such element is regarded as being composed of any or all of three parts: input information, some transformation of that input information, and some useful output information. Another fundamental principle of PIA is the assumption that no consumer of information, whether human or computer, can be assumed to have any useful foreknowledge of an element presented to it. Consequently, a PIA-compliant computing system is required to be ready to respond to any questions, posed by the consumer, concerning the nature of the proffered element. In colloquial terms, a PIA-compliant system must be prepared to provide all the information needed to place the element in context. To satisfy this requirement, PIA extends the previously established object-oriented- programming concept of self-revelation and applies it on a grand scale. To enable pervasive use of self-revelation, PIA exploits another previously established object-oriented-programming concept - that of semantic infusion through class derivation. By means of self-revelation and semantic infusion through class derivation, a consumer of information can inquire about the contents of all information entities (e.g., databases and software) and can interact appropriately with those entities. Other key features of PIA are listed.

  18. Yucca Mountain Site Characterization Project: Technical Data Catalog (quarterly supplement), June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The DOE/NRC Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the date, place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  19. GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.N.

    1994-04-15

    Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

  20. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  1. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  2. The University of Rochester Atomic Energy Project quarterly report, April 1, 1950--June 30, 1950

    Energy Technology Data Exchange (ETDEWEB)

    Blair, H.A.

    1950-12-31

    This quarterly progress report gives an overview of the University of Rochester Atomic Energy Project for April 1, 1950 thru June 30, 1950. Sections included are entitled (1) Biological Effects of External Radiation (X-rays and gamma rays), (2) Biological Effects of External Radiation (Infra-red and ultraviolet), (3) Biological effects of radioactive materials (polonium, radon, thoron, and miscellaneous project materials), (4) Uranium, (5) Beryllium, (7) thorium, (8) fluoride, (9) zirconium, (10) special materials, (11) Isotopes, (12) Outside services, (12) Project health, (13) Health physics, (14) Special Clinical Service, and (15) Instrumentation (Spectroscopy, electron microscopy, x-ray and nuclear radiation detectors, x-ray diffraction, and electronics).

  3. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  4. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management Program. The project period has been determined to be 7.5 months, April 1 to November 14, 1998 in order to align with the federal fiscal year. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI Program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reported are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College).

  5. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  6. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  7. Salt repository project: Technical progress report for the quarter 1 April--30 June 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of Energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation

  8. Salt Repository Project technical progress report for the quarter 1 January--31 March 1987

    International Nuclear Information System (INIS)

    1988-03-01

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation. 23 refs., 1 fig

  9. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  10. Field Verification Project for Small Wind Turbines, Quarterly Report: April - June 2001; 2nd Quarter, Issue No.5

    Energy Technology Data Exchange (ETDEWEB)

    2002-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted out of the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  11. Field Verification Project for Small Wind Turbines Quarterly Report; July-September 2001, 3rd Quarter, Issue#6

    Energy Technology Data Exchange (ETDEWEB)

    2003-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted at the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  12. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  13. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  14. BX in-situ oil-shale project. Quarterly technical progress report, June 1, 1981-August 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1981-09-20

    June 1, 1981-August 31, 1981 was the third consecutive quarter of superheated steam injection at the BX In Situ Oil Shale Project. Injection was continuous except for the period of July 14th to August 1st when the injection was suspended during the drilling of core hole BX-37. During the quarter, 99,760 barrels of water as superheated steam were injected into Project injection wells at an average well head temperature of 752/sup 0/F and an average wellhead pressure of 1312 PSIG. During the same period, 135,469 barrels of fluid were produced from the Project production wells for a produced to injected fluid ratio of 1.36 to 1.0. Net oil production during the quarter was 38 barrels.

  15. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  16. MHD Integrated Topping Cycle Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  17. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

  18. Study of integration issues to realize OTEC market potential. First quarterly report. [134 references

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    The specific objective of this study is to examine the commercialization of OTEC technology in the electric utility industry in the Gulf region of the United States. To accomplish this, the project staff is identifying the major issues that will arise in the integration of OTEC units into the power delivery systems in the Gulf Region. Among these issues are problems that must be resolved and barriers to be overcome. These are being identified and alternative approaches to resolving or overcoming them will be explored. Their relative importance in the integration will be assessed as well. The alternative approaches to resolving problems and overcoming barriers will be evaluated to determine their relative effectiveness, and the problems and barriers will be conceptually resolved. This evaluation will permit the recommendation of preferred approaches to integration and the preferred approaches will be assembled into a structured strategy for OTEC commercialization. A list of 134 references relevant to OTEC electric power plant integration issues is included.

  19. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management program. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reports are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College). The purpose of this program is to offer educational opportunities to Native Americans in the environmental field.

  20. Minnesota Agri-Power Project. Quarterly report, January--March, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Wilbur, D.

    1998-05-01

    The Minnesota Valley Alfalfa Producers propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota industrial park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project utilizes air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. This progress report describes feedstock testing, feedstock supply system, performance guarantees, sales contracts, environmental permits, education, environment, economy, and project coordination and control.

  1. Integrated waste hydrogen utilization project

    International Nuclear Information System (INIS)

    Armstrong, C.

    2004-01-01

    'Full text:' The BC Hydrogen Highway's, Integrated Waste Hydrogen Utilization Project (IWHUP) is a multi-faceted, synergistic collaboration that will capture waste hydrogen and promote its use through the demonstration of 'Hydrogen Economy' enabling technologies developed by Canadian companies. IWHUP involves capturing and purifying a small portion of the 600 kg/hr of by-product hydrogen vented to the atmosphere at the ERCO's electrochemical sodium chlorate plant in North Vancouver, BC. The captured hydrogen will then be compressed so it is suitable for transportation on roadways and can be used as a fuel in transportation and stationary fuel cell demonstrations. In summary, IWHUP invests in the following; Facilities to produce up to 20kg/hr of 99.999% pure 6250psig hydrogen using QuestAir's leading edge Pressure Swing Absorption technology; Ultra high-pressure transportable hydrogen storage systems developed by Dynetek Industries, Powertech Labs and Sacre-Davey Engineering; A Mobile Hydrogen Fuelling Station to create Instant Hydrogen Infrastructure for light-duty vehicles; Natural gas and hydrogen (H-CNG) blending and compression facilities by Clean Energy for fueling heavy-duty vehicles; Ten hydrogen, internal combustion engine (H-ICE), powered light duty pick-up vehicles and a specialized vehicle training, maintenance, and emissions monitoring program with BC Hydro, GVRD and the District of North Vancouver; The demonstration of Westport's H-CNG technology for heavy-duty vehicles in conjunction with local transit properties and a specialized vehicle training, maintenance, and emissions monitoring program; The demonstration of stationary fuel cell systems that will provide clean power for reducing peak-load power demands (peak shaving), grid independence and water heating; A comprehensive communications and outreach program designed to educate stakeholders, the public, regulatory bodies and emergency response teams in the local community, Supported by industry

  2. Intelligent Multi-Media Integrated Interface Project

    Science.gov (United States)

    1990-06-01

    been devoted to the application of aritificial intelligence technology to the development of human -computer interface technology that integrates speech...RADC-TR-90-128 Final Technical Report June 1090 AD-A225 973 INTELLIGENT MULTI-MEDIA INTEGRATED INTERFACE PROJECT Calspan-University of Buffalo...contractual obligations or notices on a specific document require that it be returned. INTELLIGENT MULTI-MEDIA INTEGRATED INTERFACE PROJECT J. G. Neal J. M

  3. An Ideal Integrating Bolometer Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a novel detector to enable a new class of far-IR spectroscopic surveys.  The detector, the Ideal Integrating Bolometer (IIB) is able to...

  4. Aqueous homogeneous suspension reactor project. Report over the 4th quarter and the year 1974

    Energy Technology Data Exchange (ETDEWEB)

    1975-07-01

    The power of the KSTR reactor has been increased up to 200 kW in the fourth quarter of 1974. A description is given of the behaviour of the reactor at increased power level, safety aspects concerned with this new level, the operation of the reactor, instrumental behavior and mechanical behavior. Irradiation investigation of two types of fuels are reported and results are presented. Progress made on the conceptual design of a 250 MWe suspension reactor is described.

  5. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  6. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  7. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  8. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  9. Integrated sustainable urban infrastructures in building projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Quitzau, Maj-Britt; Elle, Morten

    2007-01-01

    Current strategies in urban planning and development merely promote standardized building solutions, while failing to prioritize innovative approaches of integration between building projects and sustainable urban infrastructures. As a result of this, urban infrastructures – the urban veins...... – are outdated from a sustainability perspective. This paper looks into more holistic ways of approaching building projects and discuss whether this provide a basis for an increased integration of urban infrastructures within building projects. In our study, we especially emphasise how conventional ways...... of approaching building projects are influenced by lock-in of existing infrastructural systems and compare this with two examples of more holistic ways of approaching building projects, developed by two architecture firms. The paper points out that such holistic perspective in building projects provide...

  10. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  11. Hazardous materials in aquatic environments of the Mississippi River basin. Quarterly project status report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    During this quarter, the Review Panel made its final recommendations regarding which of the proposals should be funded. Included in this report is a brief status report of each of the research and education projects that are currently funded in this project. The Coordinated Instrumentation Facility (CIF) sponsored 3 seminars on Environmental Sample Preparation Techniques. These seminars were designed to educate the investigators on the use of microwave digestion systems for sample preparation and the use of Inductively Coupled Plasma and Atomic Absorption Specrtroscopy for analyses. During this period, Tulane and Xavier Universities have worked closely with Oak Ridge National Laboratories (ORNL) to develop a long term relationship that will encourage interaction and collaborations among the investigators at all of the institutions.

  12. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  13. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation

  14. Eurasia: The Rivalry of Global Integration Projects

    Directory of Open Access Journals (Sweden)

    Olesia Kobenko

    2016-05-01

    Full Text Available The article reveals the Eurasian integration projects as major drivers of world globalization. Eurasian regionalism seems to be gaining attention in the scientific literature. Under the current political circumstance many regions are accelerating integration and many countries are opting for regional associations as a mechanism to help them overcome the global recession. Moreover, the global political leaders , some developed countries - the U.S., China, and the European Union (EU are interested to set up regional economic blocs such as Eurasian Economic Union (The EEU, the China's project 'One Belt One Road', the U.S's projects - The Trans-Pacific Partnership (TPP and The Transatlantic Trade and Investment Partnership (TTIP. The goal of this paper is to introduce a number of integration initiatives and to analyze the current strategies of Eurasian regionalism.

  15. A comparison of electric vehicle integration projects

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Garcia-Valle, Rodrigo; Kempton, Willett

    2012-01-01

    .g. utilization of electric vehicles for ancillary services. To arrive at standardized solutions, it is helpful to analyze the market integration and utilization concepts, architectures and technologies used in a set of state-of-the art electric vehicle demonstration projects. The goal of this paper......It is widely agreed that an intelligent integration of electric vehicles can yield benefits for electric vehicle owner, power grid, and the society as a whole. Numerous electric vehicle utilization concepts have been investigated ranging from the simple e.g. delayed charging to the more advanced e...... is to highlight different approaches to electric vehicle integration in three such projects and describe the underlying technical components which should be harmonized to support interoperability and a broad set of utilization concepts. The projects investigated are the American University of Delaware's V2G...

  16. LLNL Underground-Coal-Gasification Project. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, D.R.; Clements, W. (eds.)

    1981-11-09

    We have continued our laboratory studies of forward gasification in small blocks of coal mounted in 55-gal drums. A steam/oxygen mixture is fed into a small hole drilled longitudinally through the center of the block, the coal is ignited near the inlet and burns toward the outlet, and the product gases come off at the outlet. Various diagnostic measurements are made during the course of the burn, and afterward the coal block is split open so that the cavity can be examined. Development work continues on our mathematical model for the small coal block experiments. Preparations for the large block experiments at a coal outcrop in the Tono Basin of Washington State have required steadily increasing effort with the approach of the scheduled starting time for the experiments (Fall 1981). Also in preparation is the deep gasification experiment, Tono 1, planned for another site in the Tono Basin after the large block experiments have been completed. Wrap-up work continues on our previous gasification experiments in Wyoming. Results of the postburn core-drilling program Hoe Creek 3 are presented here. Since 1976 the Soviets have been granted four US patents on various aspects of the underground coal gasification process. These patents are described here, and techniques of special interest are noted. Finally, we include ten abstracts of pertinent LLNL reports and papers completed during the quarter.

  17. Integrated technology projects for rural communities

    Energy Technology Data Exchange (ETDEWEB)

    Forestier-Walker, C O

    1982-10-01

    Integrated Technology Projects (ITP) are set up so that they interact concurrently in ways that are compatible with local cultures, religions, traditions, and life styles. This management approach can take into account the low productivity of arid and semi-arid regions by increasing water, power, and fertilizer inputs in ways that will integrate their supply with other activities and minimize costs. The author illustrates how integrated agricultural, water and sanitation, energy, and housing modules can accomplish this. 1 reference, 4 figures, 5 tables. (DCK)

  18. Quarterly Financial Report

    International Development Research Centre (IDRC) Digital Library (Canada)

    acray

    2011-06-30

    Jun 30, 2011 ... 2 IDRC QUARTERLY FINANCIAL REPORT JUNE 2011. Consolidated .... spending on capacity-building projects as well as to management's decision to restrict capacity- building ...... The investments in financial institutions.

  19. Integrating Project Portfolio With Business Strategy: Imagineering

    Directory of Open Access Journals (Sweden)

    Cesar Buaes Dal Maso

    2015-12-01

    Full Text Available Aligning project management to the strategy of a big company is a difficult job. Through Imagineering (the business department and project management program, The Walt Disney Company has done this alignment in an exemplary way. Using a theoretical investigation, this study analyzed the Imagineering as a reference in strategic management of global projects through Disney´s business portfolio, a global benchmarking and with Malmberg et al. (2010 as a company guide. As the main results of the correlations carried out, it was noted that the Imagineers who work in project teams apply tools and techniques with a strategic vision focused on differentiation, generating value, and mixing imagination with technical capacity. The Blue Sky department and its integrated units make possible the creation and deployment of the attractions, the theme parks, hotels, resorts and the Disney sea cruises, demonstrating in this way, to be a highly effective project management office.

  20. Integrative Bioethics: A Conceptually Inconsistent Project.

    Science.gov (United States)

    Ivanković, Viktor; Savić, Lovro

    2016-06-01

    This article provides a critical evaluation of the central components of Integrative Bioethics, a project aiming at a bioethical framework reconceptualization. Its proponents claim that this new system of thought has developed a better bioethical methodology than mainstream Western bioethics, a claim that we criticize here. We deal especially with the buzz words of Integrative Bioethics - pluriperspectivism, integrativity, orientational knowledge, as well as with its underlying theory of moral truth. The first part of the paper looks at what the claims of a superior methodology consist in. The second reveals pluriperspectivism and integrativity to be underdeveloped, hazy terms, but which seem to be underpinned by two theses - the incommensurability and the inclusiveness theses. These theses we critically scrutinize. We then consider strategies the project's proponents might apply to curb these theses in order to acquire minimal consistency for their framework. This part of the article also deals with the conception of moral truth that drives the theory, a position equally burdened with inconsistencies. In the last part of the article, we observe the concept of orientational knowledge, and develop two interpretations of its possible meaning. We claim that, following the first interpretation, Integrative Bioethics is completely descriptive, in which case it is informative and important, but hardly bioethics; if it is normative, following the second interpretation, it is bioethics as we already know it, but merely clad in rhetorical embellishments. We conclude that there is nothing new about this project, and that its inconsistencies are reason enough for its abandonment. © 2015 John Wiley & Sons Ltd.

  1. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  2. Integrating ecological restoration into CDM forestry projects

    International Nuclear Information System (INIS)

    Ma, Maohua; Haapanen, Toni; Singh, Ram Babu; Hietala, Reija

    2014-01-01

    Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed

  3. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributed for review and comment.

  4. Waste Package Project quarterly report, July 1, 1995--September 30, 1995

    International Nuclear Information System (INIS)

    Ladkany, S.G.

    1995-01-01

    The following tasks are reported: overview and progress of nuclear waste package project and container design; nuclear waste container design considerations; structural investigation of multi purpose nuclear waste package canister; and design requirements of rock tunnel drift for long-term storage of high-level waste (faulted tunnel model study by photoelasticity/finite element analysis)

  5. Integrated Data Base: Status and waste projections

    International Nuclear Information System (INIS)

    Klein, J.A.

    1990-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. DOE low-level waste (LLW) is just one of the many waste types that are documented with the IDB. Summary-level tables and figures are presented illustrating historical and projected volume changes of DOE LLW. This information is readily available through the annual IDB publication. Other presentation formats are also available to the DOE community through a request to the IDB Program. 4 refs., 6 figs., 5 tabs

  6. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  7. TMI-2 Vessel Investigation Project integration report

    International Nuclear Information System (INIS)

    Wolf, J.R.; Rempe, J.L.; Stickler, L.A.; Korth, G.E.; Diercks, D.R.; Neimark, L.A.; Akers, D.W.; Schuetz, B.K.; Shearer, T.L.; Chavez, S.A.; Thinnes, G.L.; Witt, R.J.; Corradini, M.L.; Kos, J.A.

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel's condition after the accident

  8. TMI-2 Vessel Investigation Project integration report

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, J. R.; Rempe, J. L.; Stickler, L. A.; Korth, G. E.; Diercks, D. R.; Neimark, L. A.; Akers, D W; Schuetz, B. K.; Shearer, T L; Chavez, S. A.; Thinnes, G. L.; Witt, R. J.; Corradini, M L; Kos, J. A. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel`s condition after the accident.

  9. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This document is a brief progress report from each of the research and education projects that are currently funded through the ERWM contract. During third quarter 1993, approval was given by DOE for purchase of equipment. Equipment purchases were initiated and much of the equipment has been received and installed. The committees in charge of coordination of sampling and analyses associated with the collaborative research groups continued to meet and address these issues. Sampling has been done in the lower part of Devil`s Swamp and in the Devil`s Swamp Lake area. In addition, extensive sampling has been done in Bayou Trepagnier and in Bayou St. John. During this period, Tulane and Xavier Universities continued working closely with Oak Ridge National Laboratories (ORNL). The ORNL 1993 summer student internship program was completed. Plans were made for expanding the program to support 8 students next summer. Leonard Price, a Xavier University Chemistry professor and John Walz, a Tulane University Engineering professor each spent 5 weeks at ORNL. During this time these faculty worked with ORNL researchers exploring mutual interests and discussing possible future collaborations. In September, Drs. Carl Gehrs, Lee Shugart and Marshall Adams of ORNL, visited the Tulane and Xavier campuses. They presented two seminars and met with several of the investigators being supported by the ERWM contract. Tulane/Xavier project administrators participated in the Office of Technology Development`s ``New Technologies and Program Exhibition`` in the Rayburn House Office Building on September 23 and in the Hart Senate Office Building on September 27.

  10. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Joo, Po Kook; Kim, Gye Ryung (and others)

    2003-06-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the subprojects from the various fields, It has been tried to make the subprojects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, TRM(Technology Road Map) is made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  11. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  12. Integrated Project Delivery (IPD Research Trends.

    Directory of Open Access Journals (Sweden)

    Kahvandi, Z.

    2017-07-01

    Full Text Available Integrated Project Delivery (IPD is introduced as a vibrant approach to enhance project implementation, having particular position in recent studies among construction researchers. This study analyzes the research trends on the field of IPD to provide an appropriate vision for future researchers in this specialized field. While so far no comprehensive research has been done in this field, this study provides a comprehensive review of existing studies through in-depth literature review method. This research evaluates studies conducted in the field of IPD, which is a basis for future researchers to improve conditions of IPD implementation in different countries. For that this study Using library studies, the trend of researches conducted on various concepts and domains during various years, has been investigated. Future studies can simply use the outputs of this research to shape their research flow on establishing continuing progress of IPD. The data obtained from descriptive analyses are illustrated quantitatively, followed by comprehensive analyses and discussion of the results. Moreover, this study concluded that during recent years, the trend of studies conducted about IPD has increased, particularly articles examined challenges. In the next step, more studies have been performed in the field of construction. Those articles are preferred that have evaluated principles, challenges, and solutions for resolving barriers. Proper IPD implementation facilitates enhanced share of information and early identification of stakeholders through a proper timing as vital keys to realize objectives of the construction projects, reduce risks, and increase the chance of project success.

  13. The integrated project as a learning experience

    Directory of Open Access Journals (Sweden)

    Maria Angeles Antequera

    2012-03-01

    Full Text Available Florida is a higher education centre specialising in technical and business training. Postgraduate programs, university qualifications, vocational training, secondary education, further education, occupational training and languages are taught at Florida. An educational model in accordance with the demands of the European Higher Education Area has been designed, focussing on teaching for professional competencies. We have chosen to use a methodology which promotes the development of skills and abilities, it promotes participation and it is student-centric as s/he must look for knowledge him/herself thus connecting the educational and the real world. In the different university degrees taught in our centre, each year the student carries out a project set in a real context which integrates specific competencies from the course subject and develops transversal competencies associated with the project which are the purpose of planning and progressive learning: team work, effective communication, conflict resolution, leadership skills, innovation and creativity. The IP counts for 25% of each course in terms of objectives, scheduling and final evaluation. The project grade is an individual grade for each student and is the same for all subjects which form part of the project.

  14. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  15. The Nikola project intelligent electric vehicle integration

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Marinelli, Mattia; Olesen, Ole Jan

    2014-01-01

    The electric vehicle (EV) has certain properties that elevate its relevance to the smart grid. If EV integration is to meet its potential in supporting an economic and secure power system and at the same time lower the operating costs for the owner, it is necessary to thoroughly and systematically...... investigate the value-adding services that an EV may provide. The Danish Nikola project defines EV services as the act of influencing the timing, rate and direction of the power and energy exchanged between the EV battery and the grid to yield benefits for user, system, and society. This paper describes...

  16. Digital Display Integration Project Project Online 2.0

    International Nuclear Information System (INIS)

    Bardsley, J. N.

    1999-01-01

    The electronic display industry is changing in three important ways. First, the dominance of the cathode ray tube (CRT) is being challenged by the development of flat panel displays (FPDs). This will lead to the availability of displays of higher performance, albeit at greater cost. Secondly, the analog interfaces between displays that show data and the computers that generate the data are being replaced by digital connections. Finally, a high-resolution display is becoming the most expensive component in computer system for homes and small offices. It is therefore desirable that the useful lifetime of the display extend over several years and that the electronics allows the display to be used with many different image sources. Hopefully, the necessity of having three or four large CRTs in one office to accommodate different computer operating systems or communication protocols will soon disappear. Instead, we hope to see a set of flat panels that can be switched to show several independent images from multiple sources or a composite image from a single source. The more rapid rate of technological improvements and the higher cost of flat panel displays raise the incentive for greater planning and guidance in the acquisition and integration of high performance displays into large organizations, such as LLNL. The goal of the Digital Display Integration Project (DDIP) is to provide such support. This will be achieved through collaboration with leading suppliers of displays, communications equipment and image-processing products, and by greater exchange of information within the Laboratory. The project will start in October 1999. During the first two years (FY2000-1), the primary focus of the program will be upon: introducing displays with high information content (over 5M pixels); facilitating the transition from analog to digital interfaces; enabling data transfer from key computer platforms; incorporating optical communications to remove length restrictions on data

  17. European Europart integrated project on actinide partitioning

    International Nuclear Information System (INIS)

    Madic, C.; Hudson, M.J.

    2005-01-01

    This poster presents the objectives of EUROPART, a scientific integrated project between 24 European partners, mostly funded by the European Community within the FP6. EUROPART aims at developing chemical partitioning processes for the so-called minor actinides (MA) contained in nuclear wastes, i.e. from Am to Cf. In the case of dedicated spent fuels or targets, the actinides to be separated also include U, Pu and Np. The techniques considered for the separation of these radionuclides belong to the fields of hydrometallurgy and pyrometallurgy, as in the previous FP5 programs named PARTNEW and PYROREP. The two main axes of research within EUROPART will be: The partitioning of MA (from Am to Cf) from high burn-up UO x fuels and multi-recycled MOx fuels; the partitioning of the whole actinide family for recycling, as an option for advanced dedicated fuel cycles (and in connection with the studies to be performed in the EUROTRANS integrated project). In hydrometallurgy, the research is organised into five Work Packages (WP). Four WP are dedicated to the study of partitioning methods mainly based on the use of solvent extraction methods, one WP is dedicated to the development of actinide co-conversion methods for fuel or target preparation. The research in pyrometallurgy is organized into four WP, listed hereafter: development of actinide partitioning methods, study of the basic chemistry of trans-curium elements in molten salts, study of the conditioning of the wastes, some system studies. Moreover, a strong management team will be concerned not only with the technical and financial issues arising from EUROPART, but also with information, communication and benefits for Europe. Training and education of young researchers will also pertain to the project. EUROPART has also established collaboration with US DOE and Japanese CRIEPI. (authors)

  18. Project TIMS (Teaching Integrated Math/Science)

    Science.gov (United States)

    Edwards, Leo, Jr.

    1993-01-01

    The goal of this project is to increase the scientific knowledge and appreciation bases and skills of pre-service and in-service middle school teachers, so as to impact positively on teaching, learning, and student retention. This report lists the objectives and summarizes the progress thus far. Included is the working draft of the TIMS (Teaching Integrated Math/Science) curriculum outline. Seven of the eight instructional subject-oriented modules are also included. The modules include informative materials and corresponding questions and educational activities in a textbook format. The subjects included here are the universe and stars; the sun and its place in the universe; our solar system; astronomical instruments and scientific measurements; the moon and eclipses; the earth's atmosphere: its nature and composition; and the earth: directions, time, and seasons. The module not included regards winds and circulation.

  19. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  20. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  1. Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

  2. Hydroacoustic Studies Using HydroCAM - Station-centric Integration of Models and Observations Quarterly Report No.4 July 2003 - September 2003

    International Nuclear Information System (INIS)

    Upton, Zachary M.; Pulli, Jay J.

    2003-01-01

    OAK B272 Quarterly technical report summarizing BBN's efforts to improve DOE's hydroacoustic modeling and analysis capability for nuclear explosion monitoring. BBN's work during the third quarter of 2003 was focused on preparations for and participation in the 2003 Seismic Research Review Meeting, unit testing and bug fixes to HydroCAM 4.1, data collection and analysis, and procuring high-resolution bathymetric data. In an attempt to save money, BBN scaled back its labor in the third quarter, delaying some deliverables but saving contract funding in case our next increment is delayed. We have succeeded in finding the correct Naval contact that can help us procure high-resolution bathymetry data. Although these data may require the release of a classified version of HydroCAM, we are optimistic that we will be able to acquire and integrate high-resolution bathymetric data near the Indian Ocean IMS stations. HydroCAM 4.1, which includes the ability to make blockage predictions using varying resolution bathymetric data, has completed unit testing and is now under integration (release) testing. We hope to deliver that functionality to DOE and AFTAC in November. BBN improved its database of hydroacoustic events in the Indian Ocean by including meta-data for associated arrivals. For each earthquake event, BBN is now picking the direct arrival at each station (Diego Garcia North and South, and Cape Leeuwin) and associating that arrival with the origin information that we are compiling. The data for 2001, 2002 and 2003 (to date) will be delivered to LLNL for integration into the Knowledge Base during the fourth quarter of 2003

  3. Information and image integration: project spectrum

    Science.gov (United States)

    Blaine, G. James; Jost, R. Gilbert; Martin, Lori; Weiss, David A.; Lehmann, Ron; Fritz, Kevin

    1998-07-01

    The BJC Health System (BJC) and the Washington University School of Medicine (WUSM) formed a technology alliance with industry collaborators to develop and implement an integrated, advanced clinical information system. The industry collaborators include IBM, Kodak, SBC and Motorola. The activity, called Project Spectrum, provides an integrated clinical repository for the multiple hospital facilities of the BJC. The BJC System consists of 12 acute care hospitals serving over one million patients in Missouri and Illinois. An interface engine manages transactions from each of the hospital information systems, lab systems and radiology information systems. Data is normalized to provide a consistent view for the primary care physician. Access to the clinical repository is supported by web-based server/browser technology which delivers patient data to the physician's desktop. An HL7 based messaging system coordinates the acquisition and management of radiological image data and sends image keys to the clinical data repository. Access to the clinical chart browser currently provides radiology reports, laboratory data, vital signs and transcribed medical reports. A chart metaphor provides tabs for the selection of the clinical record for review. Activation of the radiology tab facilitates a standardized view of radiology reports and provides an icon used to initiate retrieval of available radiology images. The selection of the image icon spawns an image browser plug-in and utilizes the image key from the clinical repository to access the image server for the requested image data. The Spectrum system is collecting clinical data from five hospital systems and imaging data from two hospitals. Domain specific radiology imaging systems support the acquisition and primary interpretation of radiology exams. The spectrum clinical workstations are deployed to over 200 sites utilizing local area networks and ISDN connectivity.

  4. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  5. Researchers' experiences, positive and negative, in integrative landscape projects

    NARCIS (Netherlands)

    Tress, B.; Tress, G.; Fry, G.

    2005-01-01

    Integrative (interdisciplinary and transdisciplinary) landscape research projects are becoming increasingly common. As a result, researchers are spending a larger proportion of their professional careers doing integrative work, participating in shifting interdisciplinary teams, and cooperating

  6. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  7. NST Quarterly

    International Nuclear Information System (INIS)

    1995-01-01

    NST Quarterly reports current development in nuclear science and technology in Malaysia. It keeps readers informed on the progress of research, services, application of nuclear science and technology, and other technical news. It highlights MINT activities and also announces coming events

  8. NST Quarterly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    NST Quarterly reports current development in nuclear science and technology in Malaysia. It keeps readers informed on the progress of research, services, application of nuclear science and technology, and other technical news. It highlights MINT activities and also announces coming events.

  9. Quarterly coal report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  10. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  11. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  12. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  13. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  14. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  15. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  16. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  17. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  18. Projection operator and propagator for an arbitrary integral spin

    CERN Document Server

    Huang Shi Zhong; Wu Ning; Zheng Zhi Peng

    2002-01-01

    Based on the solution of the Bargmann-Wigner equation for an arbitrary integral spin, a direct derivation of the projection operator and propagator for an arbitrary integral spin is presented. The explicit form for the spin projection operators constructed by Behrends and Fronsdal is confirmed. The commutation rules and a general expression for the Feynman propagator for a free particle of arbitrary integral spin are deduced

  19. Low NOx Fuel Flexible Combustor Integration Project Overview

    Science.gov (United States)

    Walton, Joanne C.; Chang, Clarence T.; Lee, Chi-Ming; Kramer, Stephen

    2015-01-01

    The Integrated Technology Demonstration (ITD) 40A Low NOx Fuel Flexible Combustor Integration development is being conducted as part of the NASA Environmentally Responsible Aviation (ERA) Project. Phase 2 of this effort began in 2012 and will end in 2015. This document describes the ERA goals, how the fuel flexible combustor integration development fulfills the ERA combustor goals, and outlines the work to be conducted during project execution.

  20. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  1. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  2. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  3. Integrating transit with road pricing projects.

    Science.gov (United States)

    2013-06-01

    This study examined various levels of the treatment of public transportation in conjunction with the implementation of : managed lane highway projects. It details the ranges of transit investments identified in and associated with managed : lanes tha...

  4. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  5. Water Integration Project Science Strategies White Paper

    International Nuclear Information System (INIS)

    Alan K. Yonk

    2003-01-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document

  6. Water Integration Project Science Strategies White Paper

    Energy Technology Data Exchange (ETDEWEB)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  7. Equity Oil Company BX in situ oil shale project, Piceance Basin, Colorado. Environmental quarter report, March 1-May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-06-12

    This report has been organized into three sections for ease of review. Section A - Air Resources covers data collected by the 100-foot tower between September and December 1980. Section B - Water Resources covers data collected since the last Quarterly Report. Section C - Aquatic Biology covers data collected since January 1981. Laboratory analysis results of all water samples show no significant changes from previous sample have occurred. The alluvial wells did exhibit slightly higher concentrations of phenols. Presently no baseline record exists for these wells to establish the normal levels of phenols in the alluvial ground water. Laboratory analysis of all sampling locations are presented in Appendix B. Aquatic biology covers data collected during the initial two aquatic biology field sampling trips of 1981. Benthic invertebrates, periphyton algae, and a fishery survey was conducted. Stream observations indicate that the stream habitat has remained unchanged since the August 1980 field visit. (ATT)

  8. Joint Force Quarterly. Issue 41, 2nd Quarter, April 2006

    Science.gov (United States)

    2006-04-01

    companies participated, a million more people would be actively looking for threats. Aguas de Amazonas, a subsidiary of Suez Environnement, a...9 Richard B. Myers, “A Word from the Chair- man,” Joint Force Quarterly 37 (2d Quarter 2005), 5. 10 Wald, 26. 11 “Suez— Aguas de Amazonas Water for...humanitarian duties. They have overseen over 130 humani- tarian projects worth in excess of $7.6 million and ranging from a medical center, to potable

  9. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  10. The Ulysses Project. Integrating the Curriculum.

    Science.gov (United States)

    Smith, Susan Swenton

    2001-01-01

    Offers a project developed as an outgrowth of sixth-grade students' study of ancient Greece in history, English, drama, and art classes. Explains that the students created sculptures inspired by Greek sculpture that represented student perceptions of the activities and emotions found in the Ulysses myth. (CMK)

  11. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  12. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  13. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  14. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  15. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  16. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  17. Regional Integrated Silvopastoral Approaches to Ecosystem Management Project

    OpenAIRE

    CIPAV (Centre For Research on Sustainable Agricultural Production Systems); CATIE (Centro Agronomico Tropical de Investigacion y Ensenanza); NITLAPAN

    2007-01-01

    Metadata only record The Regional Integrated Silvopastoral Approaches to Ecosystem Management Project introduces the payment for environmental services approach to silvopastoral farmers in Colombia, Costa Rica, and Nicaragua. The objectives of the project are to "demonstrate and measure a) the effects the introduction of payment incentives for environmental services to farmers on their adoption of integrated silvopastoral farming systems in degraded pasture lands; and b) the resulting impr...

  18. Integrated fingerprinting in secure digital cinema projection

    Science.gov (United States)

    Delannay, Damien; Delaigle, Jean-Francois; Macq, Benoit M. M.; Quisquater, Jean-Jacques; Mas Ribes, Joan M.; Boucqueau, Jean M.; Nivart, Jean-Francois

    2001-12-01

    This paper describes the functional model of a combined conditional access and fingerprinting copyright (-or projectionright) protection system in a digital cinema framework. In the cinema industry, a large part of early movie piracy comes from copies made in the theater itself with a camera. The evolution towards digital cinema broadcast enables watermark based fingerprinting protection systems. Besides an appropriate fingerprinting technology, a number of well defined security/cryptographic tools are integrated in order to guaranty the integrity of the whole system. The requirements are two-fold: On one side, we must ensure that the media content is only accessible at exhibition time (under specific authorization obtained after an ad-hoc film rental agreement) and contains the related exhibition fingerprint. At the other end, we must prove our ability to retrieve the fingerprint information from an illegal copy of the media.

  19. IMPRESS Integrated Project-An overview paper

    International Nuclear Information System (INIS)

    Jarvis, D.J.; Voss, D.

    2005-01-01

    IMPRESS is an acronym for Intermetallic Materials Processing in Relation to Earth and Space Solidification. This project was selected by the European Commission and recently started in November 2004. The main scientific objective of IMPRESS is to gain a better understanding of the links between materials processing routes, structure and final properties of intermetallic alloys. Technically speaking, the project aims to develop and test two distinct prototypes based on intermetallic materials, namely gas turbine blades and Raney-type catalytic powder. Numerous material processing routes are being explored within the project with a strong emphasis on solidification. For turbine blade manufacturing, the principal processes under study are tilt casting, counter-gravity casting and centrifugal casting. For catalytic powder production, the focus is placed on gas atomisation and vapour condensation processes. IMPRESS combines a wide range of fundamental studies of solidification both on ground and in space, as well as industrial process development. This paper will describe some of the different facets related to solidification

  20. Quarterly coal report, January--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    Young, P.

    1998-08-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for January through March 1998 and aggregated quarterly historical data for 1992 through the fourth quarter of 1997. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the United States, historical information has been integrated in this report. 58 tabs.

  1. Quarterly coal report, October--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1996 and aggregated quarterly historical data for 1990 through the third quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 72 tabs.

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  3. On the Sense of Ownership of a Community Integration Project ...

    African Journals Online (AJOL)

    On the Sense of Ownership of a Community Integration Project: Phenomenology as Praxis in the Transfer of Project Ownership from Third-Party Facilitators to a Community after Conflict Resolution. ... Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader.

  4. Special Project Examination in Integrated Science - Ordinary Level.

    Science.gov (United States)

    Wimpenny, David

    A science achievement test for the General Certificate of Education (GCE, England) was developed for students enrolled in the curriculum of the Schools Council Integrated Science Project. This document contains discussions of the testing program and a copy of the 1973 test. After an overview of the curriculum project and issues related to…

  5. Educational integrating projects as a method of interactive learning

    Directory of Open Access Journals (Sweden)

    Иван Николаевич Куринин

    2013-12-01

    Full Text Available The article describes a method of interactive learning based on educational integrating projects. Some examples of content of such projects for the disciplines related to the study of information and Internet technologies and their application in management are presented.

  6. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  7. Integrating semantic data models with project management

    Energy Technology Data Exchange (ETDEWEB)

    Wachter, R

    1982-01-01

    Summary form only given, as follows. The development of a data model for a project on the test and certification of computer-based information systems required a more expressive data model than that supplied by either the network, hierarchical or relational models. A data model was developed to describe the work environment and the work itself. This model is based on the entity-relationship data model of Chen and on heuristic principles of knowledge organisation used in artificial intelligence. The ER data model is reviewed and the extensions to the model are discussed.

  8. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  9. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  10. 1st quarterly report 1977

    International Nuclear Information System (INIS)

    1977-06-01

    The present report describes the activities carried out in the 1st quarter of 1977 at the Gesellschaft fuer Kernforschung in Karlsruhe or on its behalf in the framework of the fast breeder project (PSB). The problems and main results of the partial projects fuel rod development, materials testing, reactor physics, reactor safety and reactor technology are presented. (RW) [de

  11. Project analysis and integration economic analyses summary

    Science.gov (United States)

    Macomber, H. L.

    1986-01-01

    An economic-analysis summary was presented for the manufacture of crystalline-silicon modules involving silicon ingot/sheet, growth, slicing, cell manufacture, and module assembly. Economic analyses provided: useful quantitative aspects for complex decision-making to the Flat-plate Solar Array (FSA) Project; yardsticks for design and performance to industry; and demonstration of how to evaluate and understand the worth of research and development both to JPL and other government agencies and programs. It was concluded that future research and development funds for photovoltaics must be provided by the Federal Government because the solar industry today does not reap enough profits from its present-day sales of photovoltaic equipment.

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  13. Successful integration of fast track projects into turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J. Patrick; Loureiro, Ramon C. [KBC Advanced Technologies, Surrey (United Kingdom)

    2012-07-01

    Fast track projects can provide quick wins and competitive advantage. However, in most cases the implementation of these projects requires a shutdown for installing the necessary tie-ins or integration into an upcoming turnaround (TA). Depending on the nature of the project and complexity of the TA, the integration can be seamless or result in cost or duration overruns and safety incidents. The risk of such overruns and safety incidents increases with the amount of project work to be integrated into the operations, maintenance and inspection schedules to be executed during the TA. The risk further increases with TA size and other factors. If not planned and scheduled properly and in a timely fashion, capital projects, in particular fast track projects trying to take advantage of an upcoming TA, can severely impact both TA performance, and the safety and reliability of the facility until the next opportunity for eliminating the defects introduced during the TA. Successful TAs are those delivered in a safe, on time, on budget manner, and with the quality standards needed for a leak-free start-up and a safe and reliable operation over the next run cycle. This paper discusses the key elements that are required to minimize the TA risks derived from the inclusion of fast track projects and how to establish the cut off criteria to either cancel or defer the project, or delay the TA in order to balance TA scope freeze and the case for compelling economics.(author)

  14. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  15. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

  16. Integral Histogram with Random Projection for Pedestrian Detection.

    Directory of Open Access Journals (Sweden)

    Chang-Hua Liu

    Full Text Available In this paper, we give a systematic study to report several deep insights into the HOG, one of the most widely used features in the modern computer vision and image processing applications. We first show that, its magnitudes of gradient can be randomly projected with random matrix. To handle over-fitting, an integral histogram based on the differences of randomly selected blocks is proposed. The experiments show that both the random projection and integral histogram outperform the HOG feature obviously. Finally, the two ideas are combined into a new descriptor termed IHRP, which outperforms the HOG feature with less dimensions and higher speed.

  17. A Policy Guide on Integrated Care (PGIC: Lessons Learned from EU Project INTEGRATE and Beyond

    Directory of Open Access Journals (Sweden)

    Liesbeth Borgermans

    2017-09-01

    Full Text Available Efforts are underway in many European countries to channel efforts into creating improved integrated health and social care services. But most countries lack a strategic plan that is sustainable over time, and that reflects a comprehensive systems perspective. The Policy Guide on Integrated Care (PGIC as presented in this paper resulted from experiences with the EU Project INTEGRATE and our own work with healthcare reform for patients with chronic conditions at the national and international level. This project is one of the largest EU funded projects on Integrated Care, conducted over a four-year period (2012–2016 and included partners from nine European countries. Project Integrate aimed to gain insights into the leadership, management and delivery of integrated care to support European care systems to respond to the challenges of ageing populations and the rise of people living with long-term conditions. The objective of this paper is to describe the PGIC as both a tool and a reasoning flow that aims at supporting policy makers at the national and international level with the development and implementation of integrated care. Any Policy Guide on Integrated should build upon three building blocks, being a mission, vision and a strategy that aim at capturing the large amount of factors that directly or indirectly influence the successful development of integrated care.

  18. A Policy Guide on Integrated Care (PGIC): Lessons Learned from EU Project INTEGRATE and Beyond.

    Science.gov (United States)

    Borgermans, Liesbeth; Devroey, Dirk

    2017-09-25

    Efforts are underway in many European countries to channel efforts into creating improved integrated health and social care services. But most countries lack a strategic plan that is sustainable over time, and that reflects a comprehensive systems perspective. The Policy Guide on Integrated Care (PGIC) as presented in this paper resulted from experiences with the EU Project INTEGRATE and our own work with healthcare reform for patients with chronic conditions at the national and international level. This project is one of the largest EU funded projects on Integrated Care, conducted over a four-year period (2012-2016) and included partners from nine European countries. Project Integrate aimed to gain insights into the leadership, management and delivery of integrated care to support European care systems to respond to the challenges of ageing populations and the rise of people living with long-term conditions. The objective of this paper is to describe the PGIC as both a tool and a reasoning flow that aims at supporting policy makers at the national and international level with the development and implementation of integrated care. Any Policy Guide on Integrated should build upon three building blocks, being a mission, vision and a strategy that aim at capturing the large amount of factors that directly or indirectly influence the successful development of integrated care.

  19. Project Integration Architecture: Inter-Application Propagation of Information

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    A principal goal of the Project Integration Architecture (PIA) is to facilitate the meaningful inter-application transfer of application-value-added information. Such exchanging applications may be largely unrelated to each other except through their applicability to an overall project; however, the PIA effort recognizes as fundamental the need to make such applications cooperate despite wide disparaties either in the fidelity of the analyses carried out, or even the disciplines of the analysis. This paper discusses the approach and techniques applied and anticipated by the PIA project in treating this need.

  20. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations

  1. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations.

  2. Electric Vehicle Fleet Integration in the Danish EDISON Project

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Træholt, Chresten; Marra, Francesco

    2010-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both the individual car owners and society as a whole through reductions in CO2 emissions. The consortium partners...

  3. France And The Economic Integration Project In Francophone Africa ...

    African Journals Online (AJOL)

    France And The Economic Integration Project In Francophone Africa. Kunle Amuwo. Abstract. No Abstract African Journal of Political Science Vol.4(1) 1999: 1-20. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · http://dx.doi.org/10.4314/ajps.v4i1.27343 · AJOL African ...

  4. Towards an integration of a pedagogical and political project: the ...

    African Journals Online (AJOL)

    Towards an integration of a pedagogical and political project: the use of the genre approach in academic literacy development. C Thomson. Abstract. No Abstract. South African Journal of Higher Education 2005, Vol. 19(1): 20-30. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD ...

  5. Taking Responsibility: The integration of Sustainability and Project Management

    NARCIS (Netherlands)

    Jasper van den Brink; Gilbert Gilbert Silvius

    2011-01-01

    Sustainability is one of the most important challenges of our time. How can we develop prosperity, without compromising the life of future generations? Companies are integrating ideas of sustainability in their marketing, corporate communications, annual reports and in their actions. Projects as

  6. Theory, modeling, and integrated studies in the Arase (ERG) project

    Science.gov (United States)

    Seki, Kanako; Miyoshi, Yoshizumi; Ebihara, Yusuke; Katoh, Yuto; Amano, Takanobu; Saito, Shinji; Shoji, Masafumi; Nakamizo, Aoi; Keika, Kunihiro; Hori, Tomoaki; Nakano, Shin'ya; Watanabe, Shigeto; Kamiya, Kei; Takahashi, Naoko; Omura, Yoshiharu; Nose, Masahito; Fok, Mei-Ching; Tanaka, Takashi; Ieda, Akimasa; Yoshikawa, Akimasa

    2018-02-01

    Understanding of underlying mechanisms of drastic variations of the near-Earth space (geospace) is one of the current focuses of the magnetospheric physics. The science target of the geospace research project Exploration of energization and Radiation in Geospace (ERG) is to understand the geospace variations with a focus on the relativistic electron acceleration and loss processes. In order to achieve the goal, the ERG project consists of the three parts: the Arase (ERG) satellite, ground-based observations, and theory/modeling/integrated studies. The role of theory/modeling/integrated studies part is to promote relevant theoretical and simulation studies as well as integrated data analysis to combine different kinds of observations and modeling. Here we provide technical reports on simulation and empirical models related to the ERG project together with their roles in the integrated studies of dynamic geospace variations. The simulation and empirical models covered include the radial diffusion model of the radiation belt electrons, GEMSIS-RB and RBW models, CIMI model with global MHD simulation REPPU, GEMSIS-RC model, plasmasphere thermosphere model, self-consistent wave-particle interaction simulations (electron hybrid code and ion hybrid code), the ionospheric electric potential (GEMSIS-POT) model, and SuperDARN electric field models with data assimilation. ERG (Arase) science center tools to support integrated studies with various kinds of data are also briefly introduced.[Figure not available: see fulltext.

  7. Trend chart: wind power. Forth quarter 2016

    International Nuclear Information System (INIS)

    Coltier, Yves

    2017-02-01

    This publication presents the wind energy situation of continental France and overseas territories during the forth quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  8. Trend chart: wind power. First quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-05-01

    This publication presents the wind energy situation of continental France and overseas territories during the first quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  9. Trend chart: wind power. Second quarter 2017

    International Nuclear Information System (INIS)

    2017-08-01

    This publication presents the wind energy situation of continental France and overseas territories during the second quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, revision of results

  10. Trend chart: wind power. Fourth quarter 2017

    International Nuclear Information System (INIS)

    Moreau, Sylvain

    2018-02-01

    This publication presents the wind energy situation of continental France and overseas territories during the fourth quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, revision of results

  11. Trend chart: wind power. Third quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-11-01

    This publication presents the wind energy situation of continental France and overseas territories during the third quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  12. Trend chart: wind power. Second quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-08-01

    This publication presents the wind energy situation of continental France and overseas territories during the second quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  13. Trend chart: wind power. Third quarter 2017

    International Nuclear Information System (INIS)

    2017-11-01

    This publication presents the wind energy situation of continental France and overseas territories during the third quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, revision of results

  14. Trend chart: wind power. First quarter 2017

    International Nuclear Information System (INIS)

    2017-05-01

    This publication presents the wind energy situation of continental France and overseas territories during the first quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  15. Trend chart: wind power. Forth quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-02-01

    This publication presents the wind energy situation of continental France and overseas territories during the forth quarter 2015: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  16. Trend chart: wind power. Third quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2015-11-01

    This publication presents the wind energy situation of continental France and overseas territories during the third quarter 2015: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  17. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    Science.gov (United States)

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  18. Quarterly coal report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities. This report presents detailed quarterly data for october through December 1997 and aggregated quarterly historical data for 1991 through the third quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data, as specified in Section 202 of the energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  19. Performance Criteria of Spatial Development Projects Based on Interregional Integration

    Directory of Open Access Journals (Sweden)

    Elena Viktorovna Kurushina

    2018-03-01

    Full Text Available The search of efficient ways for the development of regional socio-economic space is a relevant problem. The authors consider the models of spatial organization according to the Spatial Development Strategy of the Russian Federation until 2030. We conduct the comparative analysis of scenarios for the polarized and diversified spatial growth. Many investigations consider the concepts of polarized and endogenous growth. This study proposes a methodology to assess the development of macroregions and to increase the viability of interregional integration projects. To develop this methodology, we formulate scientific principles and indirect criteria of the project performance conforming to the theory of regional integration. In addition to the territorial community and complementarity of the development potentials, regional integration in the country should be based on the principles of security, networking, limited quantity and awareness of the potential project participants. Integration should ensure synergetic effects and take into account cultural and historical closeness, that manifests in the common mentality and existing economic relations among regions. The calculation results regarding the indirect criteria are obtained using the methods of classification and spatial correlation. This study confirms the hypothesis, that the formation of the Western Siberian and Ural macro-regions is appropriate. We have concluded this on the basis of the criteria of economic development, economic integration, the similarity of regional spaces as habitats, and a number of participants for the subjects of the Ural Federal District. The projection of the patterns of international economic integration to the interregional level allows predicting the highest probability for the successful cooperation among the Western Siberian regions with a high level of economic development. The authors’ method has revealed a high synchronization between the economies of

  20. NRC quarterly [status] report

    International Nuclear Information System (INIS)

    1987-01-01

    This report covers the third quarter of calendar year 1987. The NRC licensing activity during the period of this report included the issuance of a full-power license for Beaver Valley 2 on August 14, 1987, and operating license restricted to five percent power for South Texas Unit 1 on August 21, 1987. Additional licensing delay for Shoreham is projected due to complex litigation. Also, licensing delay may occur for Comanche Peak Unit 1, because the duration of the hearing is uncertain. Although a license authorizing fuel loading and precriticality testing for Seabrook Unit 1 has been issued, there is a projected delay for low-power licensing. Full-power licensing for Seabrook Unit 1 will be delayed due to offsite emergency preparedness issues. The length of the delay is not known at this time. With the exception of Seabrook and Shoreham, regulatory delays in this report are not impacted by the schedules for resolving off-site emergency preparedness issues

  1. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  2. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  3. ARPA-E Program: Advanced Management Protection of Energy Storage Devices (AMPED) - Fifth Quarterly Project Report - FY14 Q1

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Joseph [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-13

    -discharge cycling at various temperatures, thereby enabling earlier warning of thermal runaway than possible with external sensors. Ultimately, the team plans to extend this work to include: (12) flexible wireless controllers, also using Bluetooth 4.0 standard, essential for balancing large-scale battery packs. LLNL received $925K for this project, and has $191K remaining after accomplishing these objectives.

  4. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  5. Quarterly environmental data summary for fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.

  6. The AMTEX Partnership. Third quarter report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The AMTEX Partnership is a collaborative research and development program among the U.S. Integrated Textile Industry, the Department of Energy, The DOE laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital U.S. industry and thereby preserve and create American jobs. During the third quarter of 1994 all the Cooperative Research and Development Agreements (CRADAs) were completed and work initiated for three additional projects: Computer Aided Fabric Evaluation (CAFE), Textile Resource Conservation (TReC), and Sensors for Agile Manufacturing (SFAM). The plan for a Cotton Biotechnology project was completed and reviewed by the Industry Technical Advisory Committee. In addition, an `impact study` on the topic of flexible fiber production was conducted by an industry group led by the fiber manufacturers.

  7. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  8. Architectures of adaptive integration in large collaborative projects

    Directory of Open Access Journals (Sweden)

    Lois Wright Morton

    2015-12-01

    Full Text Available Collaborations to address complex societal problems associated with managing human-natural systems often require large teams comprised of scientists from multiple disciplines. For many such problems, large-scale, transdisciplinary projects whose members include scientists, stakeholders, and other professionals are necessary. The success of very large, transdisciplinary projects can be facilitated by attending to the diversity of types of collaboration that inevitably occur within them. As projects progress and evolve, the resulting dynamic collaborative heterogeneity within them constitutes architectures of adaptive integration (AAI. Management that acknowledges this dynamic and fosters and promotes awareness of it within a project can better facilitate the creativity and innovation required to address problems from a systems perspective. In successful large projects, AAI (1 functionally meets objectives and goals, (2 uses disciplinary expertise and concurrently bridges many disciplines, (3 has mechanisms to enable connection, (4 delineates boundaries to keep focus but retain flexibility, (5 continuously monitors and adapts, and (6 encourages project-wide awareness. These principles are illustrated using as case studies three large climate change and agriculture projects funded by the U.S. Department of Agriculture-National Institute of Food and Agriculture.

  9. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  10. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  11. NST Quarterly - Oct 2000 issue

    International Nuclear Information System (INIS)

    2000-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights the bioremediation of soils, the use of biological agents to reclaim soils and water polluted by substances hazardous to human health and/or the environment. Integrated waste management and thermal oxidation plant also reported, the topics discussed includes the role of the integrated waste management system, plant description and equipment design

  12. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  13. Integration, Configuration and Coordination: from Project to Reality, at CERN

    CERN Document Server

    Barberan Marin, Maria; Bernardini, Marzia; Birtwistle, Thomas; Chemli, Samy; Corso, Jean-Pierre; Coupard, Julie; Foraz, Katy; Grillot, Serge; Muttoni, Yvon; Perrot, Anne-Laure

    2016-01-01

    The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.

  14. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  15. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  16. Integrated project delivery methods for energy renovation of social housing

    Directory of Open Access Journals (Sweden)

    Tadeo Baldiri Salcedo Rahola

    2015-11-01

    renting them. As such, SHOs are used to dealing with renovations on a professional basis. The limited financial capacity of SHOs to realise energy renovations magnifies the importance of improving process performance in order to get the best possible outcomes. In the last 30 years numerous authors have addressed the need to improve the performance of traditional construction processes via alternative project delivery methods. However, very little is known about the specifics of renovations processes for social housing, the feasibility of applying innovative construction management methods and the consequences for the process, for the role of all the actors involved and for the results of the projects. The aim of this study is to provide an insight into the project delivery methods available for SHOs when they are undertaking energy renovation projects and to evaluate how these methods could facilitate the achievement of a higher process performance. The main research question is: How can Social Housing Organisations improve the performance of energy renovation processes using more integrated project delivery methods? The idea of a PhD thesis about social housing renovation processes originated from the participation of TU Delft as research partner in the Intelligent Energy Europe project SHELTER1 which was carried out between 2010 and 2013. The aim of the SHELTER project was to promote and facilitate the use of new models of cooperation, inspired by integrated design, for the energy renovation of social housing. The SHELTER project was a joint effort between six social housing organisations (Arte Genova, Italy; Black Country Housing Group, United Kingdom; Bulgarian Housing Association, Bulgaria; Dynacité, France; Logirep, France and Société Wallonne du Logement, Belgium, three European professional federations based in Brussels (Architects Council of Europe, Cecodhas Housing Europe and European Builders Confederation and one research partner (Delft University of

  17. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  18. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  19. Collaborative Project-Based Learning: An Integrative Science and Technological Education Project

    Science.gov (United States)

    Baser, Derya; Ozden, M. Yasar; Karaarslan, Hasan

    2017-01-01

    Background: Blending collaborative learning and project-based learning (PBL) based on Wolff (2003) design categories, students interacted in a learning environment where they developed their technology integration practices as well as their technological and collaborative skills. Purpose: The study aims to understand how seventh grade students…

  20. Integration of data: the Nanomaterial Registry project and data curation

    International Nuclear Information System (INIS)

    Guzan, K A; Mills, K C; Gupta, V; Murry, D; Ostraat, M L; Scheier, C N; Willis, D A

    2013-01-01

    Due to the use of nanomaterials in multiple fields of applied science and technology, there is a need for accelerated understanding of any potential implications of using these unique and promising materials. There is a multitude of research data that, if integrated, can be leveraged to drive toward a better understanding. Integration can be achieved by applying nanoinformatics concepts. The Nanomaterial Registry is using applied minimal information about nanomaterials to support a robust data curation process in order to promote integration across a diverse data set. This paper describes the evolution of the curation methodology used in the Nanomaterial Registry project as well as the current procedure that is used. Some of the lessons learned about curation of nanomaterial data are also discussed. (paper)

  1. INEL Waste and Environmental Information Integration Project approach and concepts

    International Nuclear Information System (INIS)

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information

  2. Project SQUID: Quarterly Progress Report

    Science.gov (United States)

    1950-07-01

    JET ENGINES. ( HYU -eÄl) Submitted by» J» Lemeleon^ New York University, No data on the operations of the glass-walled pulse jet have been...It is felt at HYU that a better understanding of the rela- tively simple phenomenon of the Rijke tube is, therefore, essential before headway...tnd combustion, KYTJ-7R6. Lerge amplitude ges vibration theory 19 HyU -7R7. Photo-ignition 1.4 NYU-7R8. Hydrocorbon Fleme Bends 67 i NYU

  3. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  4. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  5. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    Science.gov (United States)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  6. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  7. Integrating gender into natural resources management projects: USAID lessons learned.

    Science.gov (United States)

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda.

  8. Slovakia, the Gabcikovo-Nagymaros Project; and Central European integration

    International Nuclear Information System (INIS)

    Lejon, E.

    1996-01-01

    In this chapter of the book author deals with the economic, social, ecological and cultural problems in connection of the Gabcikovo-Nagymaros Project (GNP) with the integration process of the 12 European Communities countries. Slovakia - sometimes also called the corridor between the East and the West - appears to have great potential as a link in the general east-west integration. Such a role could be further reinforced by the close and purposeful cooperation between Slovakia, Hungary, Slovenia, Austria and Bavaria, and it could have a positive signal effect for the whole of Central Europe, as well as for Europe in general. However, this is possible only provided that the former COMECON countries will reduce their tendency to compete for western attention and they will begin, to a larger extent, to lay down the foundations for the indisputable benefits accruing to their population from cooperation and integration. In this respect, the GNP appears to be a crucial issue an the social and political decision on the completion of the Project would become a signal that Central Europe has entered the path towards becoming one of the most important regions of Europe

  9. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  10. Integration of models for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Napier, B.A.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since 1944. The objective of phase 1 of the project was to demonstrate through calculations that adequate models and support data exist or could be developed to allow realistic estimations of doses to individuals from releases of radionuclides to the environment that occurred as long as 45 years ago. Much of the data used in phase 1 was preliminary; therefore, the doses calculated must be considered preliminary approximations. This paper describes the integration of various models that was implemented for initial computer calculations. Models were required for estimating the quantity of radioactive material released, for evaluating its transport through the environment, for estimating human exposure, and for evaluating resultant doses

  11. Optimizing integrated reference cases in the OCTAVIUS project

    DEFF Research Database (Denmark)

    Kvamsdal, Hanne M.; Ehlers, Sören; Kather, Alfons

    2016-01-01

    . This is important especially for the coal fired power plant, where integration of waste heat from the capture plant or the CO2 compressor intercoolers can lead to a significant increase in overall efficiency. The configuration of intercoolers for the CO2 compressor is adapted to achieve the highest overall...... the CESAR, CAESAR, and DECARBit projects, two reference power plants are modelled in Ebsilon®Professional. The first is an 800 MWe coal case, the second a 430 MWe natural gas combined cycle (NGCC) case. For each power plant two separate capture plants are considered: one using 30 wt% MEA as solvent system...... efficiency. For the natural gas combined cycle plant, integration is not that beneficial, since there is no heat sink available in the water steam cycle. In the end, the cost of electricity and cost of CO2 avoided is calculated for all four cases. While the CESAR1 solvent system in a conventional absorber...

  12. Global asymptotic stability of density dependent integral population projection models.

    Science.gov (United States)

    Rebarber, Richard; Tenhumberg, Brigitte; Townley, Stuart

    2012-02-01

    Many stage-structured density dependent populations with a continuum of stages can be naturally modeled using nonlinear integral projection models. In this paper, we study a trichotomy of global stability result for a class of density dependent systems which include a Platte thistle model. Specifically, we identify those systems parameters for which zero is globally asymptotically stable, parameters for which there is a positive asymptotically stable equilibrium, and parameters for which there is no asymptotically stable equilibrium. Copyright © 2011 Elsevier Inc. All rights reserved.

  13. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  14. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  15. Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

  16. Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

  17. Integrated variable projection approach (IVAPA) for parallel magnetic resonance imaging.

    Science.gov (United States)

    Zhang, Qiao; Sheng, Jinhua

    2012-10-01

    Parallel magnetic resonance imaging (pMRI) is a fast method which requires algorithms for the reconstructing image from a small number of measured k-space lines. The accurate estimation of the coil sensitivity functions is still a challenging problem in parallel imaging. The joint estimation of the coil sensitivity functions and the desired image has recently been proposed to improve the situation by iteratively optimizing both the coil sensitivity functions and the image reconstruction. It regards both the coil sensitivities and the desired images as unknowns to be solved for jointly. In this paper, we propose an integrated variable projection approach (IVAPA) for pMRI, which integrates two individual processing steps (coil sensitivity estimation and image reconstruction) into a single processing step to improve the accuracy of the coil sensitivity estimation using the variable projection approach. The method is demonstrated to be able to give an optimal solution with considerably reduced artifacts for high reduction factors and a low number of auto-calibration signal (ACS) lines, and our implementation has a fast convergence rate. The performance of the proposed method is evaluated using a set of in vivo experiment data. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. The NASA Energy and Water Cycle Extreme (NEWSE) Integration Project

    Science.gov (United States)

    House, P. R.; Lapenta, W.; Schiffer, R.

    2008-01-01

    Skillful predictions of water and energy cycle extremes (flood and drought) are elusive. To better understand the mechanisms responsible for water and energy extremes, and to make decisive progress in predicting these extremes, the collaborative NASA Energy and Water cycle Extremes (NEWSE) Integration Project, is studying these extremes in the U.S. Southern Great Plains (SGP) during 2006-2007, including their relationships with continental and global scale processes, and assessment of their predictability on multiple space and time scales. It is our hypothesis that an integrative analysis of observed extremes which reflects the current understanding of the role of SST and soil moisture variability influences on atmospheric heating and forcing of planetary waves, incorporating recently available global and regional hydro- meteorological datasets (i.e., precipitation, water vapor, clouds, etc.) in conjunction with advances in data assimilation, can lead to new insights into the factors that lead to persistent drought and flooding. We will show initial results of this project, whose goals are to provide an improved definition, attribution and prediction on sub-seasonal to interannual time scales, improved understanding of the mechanisms of decadal drought and its predictability, including the impacts of SST variability and deep soil moisture variability, and improved monitoring/attributions, with transition to applications; a bridging of the gap between hydrological forecasts and stakeholders (utilization of probabilistic forecasts, education, forecast interpretation for different sectors, assessment of uncertainties for different sectors, etc.).

  19. Integrative, Interdisciplinary Learning in Bermuda Through Video Projects

    Science.gov (United States)

    Fox, R. J.; Connaughton, M.

    2017-12-01

    Understanding an ecosystem and how humans impact it requires a multidisciplinary perspective and immersive, experiential learning is an exceptional way to achieve understanding. In summer 2017 we took 18 students to the Bermuda Institute of Ocean Sciences (BIOS) as part of a Washington College two-week, four-credit summer field course. We took a multi-disciplinary approach in choosing the curriculum. We focused on the ecology of the islands and surrounding coral reefs as well as the environmental impacts humans are having on the islands. Additionally, we included geology and both local and natural history. Our teaching was supplemented by the BIOS staff and local tour guides. The student learning was integrated and reinforced through student-led video projects. Groups of three students were tasked with creating a 5-7 minute video appropriate for a public audience. We selected video topics based upon locations we would visit in the first week and topics were randomly assigned. The project intention was for the students to critically analyze and evaluate an area of Bermuda that is a worthwhile tourist destination. Students presented why a tourist should visit a locale, the area's ecological distinctiveness and complexity, the impact humans are having, and ways tourists can foster stewardship of that locale. These projects required students to learn how to make and edit videos, collaborate with peers, communicate a narrative to the public, integrate multi-disciplinary topics for a clear, whole-system perspective, observe the environment from a critical viewpoint, and interview local experts. The students produced the videos within the two-week period, and we viewed the videos as a group on the last day. The students worked hard, were proud of their final products, and produced excellent videos. They enjoyed the process, which provided them opportunities to collaborate, show individual strengths, be creative, and work independently of the instructors.

  20. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  1. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  2. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  3. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  4. European integration in crisis? Of supranational integration, hegemonic projects and domestic politics

    Science.gov (United States)

    Bulmer, Simon; Joseph, Jonathan

    2015-01-01

    The European Union is facing multiple challenges. Departing from mainstream theory, this article adopts a fresh approach to understanding integration. It does so by taking two theoretical steps. The first introduces the structure–agency debate in order to make explicit the relationship between macro-structures, the institutional arrangements at European Union level and agency. The second proposes that the state of integration should be understood as the outcome of contestation between competing hegemonic projects that derive from underlying social processes and that find their primary expression in domestic politics. These two steps facilitate an analysis of the key areas of contestation in the contemporary European Union, illustrated by an exploration of the current crisis in the European Union, and open up the development of an alternative, critical, theory of integration. PMID:29708125

  5. Integrated Medical Model Project - Overview and Summary of Historical Application

    Science.gov (United States)

    Myers, J.; Boley, L.; Butler, D.; Foy, M.; Goodenow, D.; Griffin, D.; Keenan, A.; Kerstman, E.; Melton, S.; McGuire, K.; hide

    2015-01-01

    Introduction: The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project. Methods: Figure 1 [see document] illustrates the IMM modeling system and scenario process. As illustrated, the IMM computational architecture is based on Probabilistic Risk Assessment techniques. Nineteen assumptions and limitations define the IMM application domain. Scenario definitions include crew medical attributes and mission specific details. The IMM forecasts probabilities of loss of crew life (LOCL), evacuation (EVAC), quality time lost during the mission, number of medical resources utilized and the number and type of medical events by combining scenario information with in-flight, analog, and terrestrial medical information stored in the iMED. In addition, the metrics provide the integrated information necessary to estimate optimized in-flight medical kit contents under constraints of mass and volume or acceptable level of mission risk. Results and Conclusions

  6. The integrated nitrous oxide and methane grassland project

    Energy Technology Data Exchange (ETDEWEB)

    Leffelaar, P.A.; Langeveld, C.A.; Hofman, J.E.; Segers, R.; Van den Pol-van Dasselaar, A.; Goudriaan, J.; Rabbinge, R.; Oenema, O. [Department of Theoretical Production Ecology, Wageningen Agricultural University, Wageningen (Netherlands)

    2000-07-01

    The integrated nitrous oxide (N{sub 2}O) and methane (CH{sub 4}) grassland project aims to estimate and explain emissions of these greenhouse gases from two ecosystems, namely drained agricultural peat soil under grass at the experimental farm Zegveld and undrained peat in the nature preserve Nieuwkoopse Plassen, both Netherlands. Peat soils were chosen because of their expected considerable contribution to the greenhouse gas budget considering the prevailing wet and partial anaerobic conditions. The emission dynamics of these ecosystems are considered representatives of large peat areas because the underlying processes are rather general and driven by variables like organic matter characteristics, water and nutrient conditions and type of vegetation. The research approach comprises measurements and modelling at different integration levels relating to the microbiology of the production and consumption of N{sub 2}O and CH{sub 4} (laboratory studies), their movement through peat soil (rhizolab and field studies), and the resulting fluxes (field studies). Typical emissions from drained soil were 15-40 kg ha{sup -1} y{sup -1} N{sub 2}O and virtually zero for CH{sub 4}. The undrained soil in the nature preserve emitted 100-280 kg ha{sup -1} y{sup -1} CH{sub 4}, and probably little N{sub 2}O. The process knowledge, collected and partly integrated in the models, helps to explain these data. For example, the low methane emission from drained peat can more coherently be understood and extrapolated because: (1) upper soil layers are aerobic, thus limiting methane production and stimulating methane oxidation, (2) absence of aerenchymatous roots of wetland plants that connect deeper anaerobic soil layers where methane is produced to the atmosphere and supply labile carbon, (3) a low methane production potential in deep layers due to the low decomposability of organic matter, and (4) long anaerobic periods needed in the topsoil to develop a methane production potential. This

  7. An integrated study of the Grayburg/San Andres reservoir, Foster and south Cowden fields, Ector County, Texas. Quarterly report, January 1--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Trentham, R.C.; Weinbrandt, R.; Reeves, J.J.

    1996-06-17

    The principal objective of this research is to demonstrate in the field that 3D seismic data can be used to aid in identifying porosity zones, permeability barriers and thief zones and thereby improve waterflood design. Geologic and engineering data will be integrated with the geophysical data to result in a detailed reservoir characterization. Reservoir simulation will then be used to determine infill drilling potential and the optimum waterflood design for the project area. This design will be implemented and the success of the waterflood evaluated.

  8. EUROPART: an European integrated project on actinide partitioning

    International Nuclear Information System (INIS)

    Madic, C.; Baron, P.; Hudson, M.J.

    2006-01-01

    Full text of publication follows: The EUROPART project is a scientific integrated project between 24 European partners, from 10 countries, mostly funded by the European Community within the FP6, together with CRIEPI from Japan and ANSTO from Australia. EUROPART aims at developing chemical partitioning processes for the so-called minor actinides (MA) contained in nuclear wastes, i.e. from Am to Cf. In the case of the treatment of dedicated spent fuels or targets, the actinides to be separated also include U, Pu and Np. The techniques considered for the separation of these radionuclides belong to the fields of hydrometallurgy and pyrometallurgy, as in the previous European FP5 programs named PARTNEW, CALIXPART and PYROREP, respectively. The two main axes of research within EUROPART are: 1/ the partitioning of MA (from Am to Cf) from wastes issuing from the reprocessing of high burn-up UOX fuels and multi-recycled MOX fuels, 2/ the partitioning of the whole actinide family of elements for recycling, as an option for advanced dedicated fuel cycles (this work will be connected to the studies to be performed within the EUROTRANS European integrated project). In hydrometallurgy, the research is organized in five Work Packages (WP). Four are dedicated to the study of partitioning methods mainly based on the use of solvent extraction methods and of solid extractants, one WP is dedicated to the development of actinide co-conversion methods for fuel or target preparations. The research in pyrometallurgy is organized into four WPs, listed hereafter: (i) study of the basic chemistry of transuranium elements and of some fission products in molten salts (chlorides, fluorides), (ii) development of actinide partitioning methods, (iii) study of the conditioning of the salt wastes, (iv) system studies. Moreover, a strong management team is concerned not only with the technical and financial issues arising from EUROPART, but also with information, communication and benefits for Europe

  9. Uranium soils integrated demonstration: Soil characterization project report

    International Nuclear Information System (INIS)

    Cunnane, J.C.; Gill, V.R.; Lee, S.Y.; Morris, D.E.; Nickelson, M.D.; Perry, D.L.; Tidwell, V.C.

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP

  10. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik

    2010-01-01

    Reaction Engineering. In order to incorporate reactor design into process design in a meaningful way, the teachers of the respective courses need to collaborate (Standard 9 – Enhancement of Faculty CDIO skills). The students also see that different components of the chemical engineering curriculum relate......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...... of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B...

  11. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  12. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  13. Uranium soils integrated demonstration: Soil characterization project report

    Energy Technology Data Exchange (ETDEWEB)

    Cunnane, J.C. [Argonne National Lab., IL (United States); Gill, V.R. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Lee, S.Y. [Oak Ridge National Lab., TN (United States); Morris, D.E. [Los Alamos National Lab., NM (United States); Nickelson, M.D. [HAZWRAP, Oak Ridge, TN (United States); Perry, D.L. [Lawrence Berkeley Lab., CA (United States); Tidwell, V.C. [Sandia National Labs., Albuquerque, NM (United States)

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

  14. Project Integration Architecture: A Practical Demonstration of Information Propagation

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  15. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  16. Hydroacoustic Studies Using HydroCAM - Station-centric Integration of Models and Observations. Quarterly Report No. 5 October - December 2003

    International Nuclear Information System (INIS)

    Upton, Zachary M.; Pulli, Jay J.

    2004-01-01

    OAK-B135 Quarterly Technical Report summarizing BBN's support of the DOE/NNSA GNEM program. This report details BBN's efforts to improve the modeling of explosions and other events underwater and their propagation to hydroacoustic sensor networks. OK to release, no restriction on copyright

  17. Project of an integrated calibration laboratory of instruments at IPEN

    International Nuclear Information System (INIS)

    Barros, Gustavo Adolfo San Jose

    2009-01-01

    The Calibration Laboratory of Instruments of Instituto de Pesquisas Energeticas e Nucleares offers calibration services of radiation detectors used in radioprotection, diagnostic radiology and radiotherapy, for IPEN and for external facilities (public and private). One part of its facilities is located in the main building, along with other laboratories and study rooms, and another part in an isolated building called Bunker. For the optimization, modernization and specially the safety, the laboratories in the main building shall be transferred to an isolated place. In this work, a project of an integrated laboratory for calibration of instruments was developed, and it will be an expansion of the current Calibration Laboratory of Instruments of IPEN. Therefore, a series of radiometric monitoring of the chosen localization of the future laboratory was realized, and all staff needs (dimensions and disposition of the study rooms and laboratories) were defined. In this project, the laboratories with X ray equipment, alpha and beta radiation sources were located at an isolated part of the building, and the wall shielding was determined, depending on the use of each laboratory. (author)

  18. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  19. Mixed Waste Treatment Project: Computer simulations of integrated flowsheets

    International Nuclear Information System (INIS)

    Dietsche, L.J.

    1993-12-01

    The disposal of mixed waste, that is waste containing both hazardous and radioactive components, is a challenging waste management problem of particular concern to DOE sites throughout the United States. Traditional technologies used for the destruction of hazardous wastes need to be re-evaluated for their ability to handle mixed wastes, and in some cases new technologies need to be developed. The Mixed Waste Treatment Project (MWTP) was set up by DOE's Waste Operations Program (EM30) to provide guidance on mixed waste treatment options. One of MWTP's charters is to develop flowsheets for prototype integrated mixed waste treatment facilities which can serve as models for sites developing their own treatment strategies. Evaluation of these flowsheets is being facilitated through the use of computer modelling. The objective of the flowsheet simulations is to provide mass and energy balances, product compositions, and equipment sizing (leading to cost) information. The modelled flowsheets need to be easily modified to examine how alternative technologies and varying feed streams effect the overall integrated process. One such commercially available simulation program is ASPEN PLUS. This report contains details of the Aspen Plus program

  20. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  1. The AMTEX Partnership{trademark}. Fourth quarter report, September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, D.K.; Quisenberry, R.K.

    1994-06-01

    The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the DOE laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. The operational and program management of the AMTEX Partnership is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership.

  2. The AMTEX Partnership. Second quarter report, Fiscal Year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

    1995-03-01

    The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby reserving and creating US jobs. The operations and program management of the AMTEX Partnership is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership.

  3. Assess the flood resilience tools integration in the landuse projects

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    Despite a severe regulation concerning the building in flooding areas, 80% of these areas are already built in the Greater Paris (Paris, Val-de-Marne, Hauts-de-Seine and Seine-Saint-Denis). The land use in flooding area is presented as one of the main solutions to solve the ongoing real estate pressure. For instance some of the industrial wastelands located along the river are currently in redevelopment and residential buildings are planned. So the landuse in the flooding areas is currently a key issue in the development of the Greater Paris area. To deal with floods there are some resilience tools, whether structural (such as perimeter barriers or building aperture barriers, etc) or non structural (such as warning systems, etc.). The technical solutions are available and most of the time efficient1. Still, we notice that these tools are not much implemented. The people; stakeholders and inhabitants, literally seems to be not interested. This papers focus on the integration of resilience tools in urban projects. Indeed one of the blockages in the implementation of an efficient flood risk prevention policy is the lack of concern of the landuse stakeholders and the inhabitants for the risk2. We conducted an important number of interviews with stakeholders involved in various urban projects and we assess, in this communication, to what extent the improvement of the resilience to floods is considered as a main issue in the execution of an urban project? How this concern is maintained or could be maintained throughout the project. Is there a dilution of this concern? In order to develop this topic we rely on a case study. The "Ardoines" is a project aiming at redeveloping an industrial site (South-East Paris), into a project including residential and office buildings and other amenities. In order to elaborate the master plan, the urban planning authority brought together some flood risk experts. According to the comments of the experts, the architect in charge of the

  4. Conference on authorisation procedures and territorial integration of methanation projects

    International Nuclear Information System (INIS)

    Boettcher, Katharina; Furois, Timothee; Molinie, Lea; Fuseliez, Sabrina; Stolpp, Sebastian; Lavoue, Fannie; Grosse, Andreas; Charbeaux, Veronique; Chapelat, Nicolas; Merigout, Patricia; Stinner, Walter; Trommler, Marcus; Jacobi, H. Fabian; Mauky, E.; Weinrich, S.

    2014-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on the authorisation procedures and the territorial integration of methanation projects. In the framework of this French-German exchange of experience, participants exchanged views on the situation of methanation industry in both countries, on the legal framework of authorization procedures, and on the different local strategies for the integration of methanation facilities. A series of presentations deal with the use of digestates and put forward the differences between France and Germany in the use and valorization of methanation digestates. This document brings together the available presentations (slides) made during this event: 1 - Bioenergy in the energy system of the future - Policy framework, new biogas regulations in the EEG 2014 German law (Katharina Boettcher); 2 - The energy Transition for Green Growth law and its role for the French biogas (Timothee Furois); 3 - The 'EMAA' (Energy Methanation Autonomy Nitrogen) plan - Progress status (Lea Molinie); 4 - Biogas in France: current status and outlooks, structuration of a developing industry and its role in the energy transition (Sabrina Fuseliez); 5 - Biogas market in Germany and potentials for development (Sebastian Stolpp); 6 - Authorization procedures in France, and the new unique authorization (Fannie Lavoue); 7 - Approval procedures for biogas plants and the protection of neighbours' rights in Germany (Andreas Grosse); 8 - Regional strategy of methanation development in Ile-de-France (Veronique Charbeaux) 9 - Renewable region and biogas integration: the Brittany biogas plan (Nicolas Chapelat); 10 - Bioenergy regions and the role of biogas - Good examples for sustainable bio-energy use (Birger Kerckow); 11 - Evaluation for registration in france of digestates produced by anaerobic digestion (Patricia Merigout); 12 - Treatment and Conditioning of Fermentation Residues from Biogas Plants (Marcus Trommler); 13

  5. Co-sponsored second quarter progress review conference on district heating

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    A summary of the progress review conference on district heating and cooling systems is presented. The agenda and lists of speakers and attendees are presented. A history of district heating and some present needs and future policies are given and an excerpt from the National District Heating Program Strategy (DOE, March 1980) is included. Following the presentation, District Heating and Cooling Systems Program, by Alan M. Rubin, a fact sheet on DOE's Integrated Community Energy Systems Program and information from an oral presentation, District Heating and Cooling Systems for Communities Through Power Plant Retrofit Distribution Network, are given. The Second Quarterly Oral Report to the US DOE on the District Heating and Cooling Project in Detroit; the executive summary of the Piqua, Ohio District Heating and Cooling Demonstration Project; the Second Quarterly Report of the Moorehead, Minnesota District Heating Project; and the report from the Moorehead, Minnesota mayor on the Hot Water District Heating Project are presented.

  6. Angular integration and inter-projection correlation effects in CT reconstruction

    International Nuclear Information System (INIS)

    Crawford, C.R.; Pele, N.J.

    1987-01-01

    CT reconstruction algorithms require snap-shot projections of an object. In order to minimize scan times, CT scanners rotate continuously which, in turn, prevents the acquisition of snap-shot projections. Acquired projections are integrals over angular position and may be correlated inter-projection. This paper shows that angular integration and inter-projection correlation introduce a radially dependent degradation of the spatial resolution and cause the image noise to vary non-linearly with radial position

  7. MUNI Ways and Structures Building Integrated Solar Membrane Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Randall

    2014-07-03

    The initial goal of the MUNI Ways and Structures Building Integrated Solar Membrane Installation Project was for the City and County of San Francisco (CCSF) to gain experience using the integrated higher efficiency solar photovoltaic (PV) single-ply membrane product, as it differs from the conventional, low efficiency, thin-film PV products, to determine the feasibility of success of larger deployment. As several of CCSF’s municipal rooftops are constrained with respect to weight restrictions, staff of the Energy Generation Group of the San Francisco Public Utilities Commission (SFPUC) proposed to install a solar PV system using single-ply membrane The installation of the 100 kW (DC-STC) lightweight photo voltaic (PV) system at the MUNI Ways and Structures Center (700 Pennsylvania Ave., San Francisco) is a continuation of the commitment of the City and County of San Francisco (CCSF) to increase the pace of municipal solar development, and serve its municipal facilities with clean renewable energy. The fourteen (14) solar photovoltaic systems that have already been installed at CCSF municipal facilities are assisting in the reduction of fossil-fuel use, and reduction of greenhouse gases from fossil combustion. The MUNI Ways & Structures Center roof has a relatively low weight-bearing capacity (3.25 pounds per square foot) and use of traditional crystalline panels was therefore rejected. Consequently it was decided to use the best available highest efficiency Building-Integrated PV (BIPV) technology, with consideration for reliability and experience of the manufacturer which can meet the low weight-bearing capacity criteria. The original goal of the project was to provide an opportunity to monitor the results of the BIPV technology and compare these results to other City and County of San Francisco installed PV systems. The MUNI Ways and Structures Center was acquired from the Cookson Doors Company, which had run the Center for many decades. The building was

  8. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Hartman, Mary J.; Dresel, P. Evan; Lindberg, Jon W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  9. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  10. Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-09

    Science.gov (United States)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Wheeler, Mark

    2009-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the fourth quarter of Fiscal Year 2009 (July - September 2009). Tasks reports include: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool. Phase III, (3) Peak Wind Tool for General Forecasting. Phase II, (4) Update and Maintain Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS), (5) Verify MesoNAM Performance (6) develop a Graphical User Interface to update selected parameters for the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLlT)

  11. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  12. MUSE: Challenges to integrate the Multi-Disciplinary field of BB access in one project

    NARCIS (Netherlands)

    Fatome, J.; Pitois, S.; Kamagate, A.; Maillotte, H.; Massoubre., D.; González-Herráez, G.-H.; Smedt, A. de; Brink, R. van den

    2006-01-01

    The present paper discusses the managerial challenges of the MUSE integrated project on multi service broadband access. It addresses different aspects such as matrix organisation, project office, consensus process, standardisation, dissemination, and quality control.

  13. Towards sustainable infrastructure development through integrated contracts : Experiences with inclusiveness in Dutch infrastructure projects

    NARCIS (Netherlands)

    Lenferink, Sander; Tillema, Taede; Arts, Jos

    Current complex society necessitates finding inclusive arrangements for delivering sustainable road infrastructure integrating design, construction and maintenance stages of the project lifecycle. In this article we investigate whether linking stages by integrated contracts can lead to more

  14. Integrating Project Management, Product Design with Industry Sponsored Projects provides Stimulating Senior Capstone Experiences

    Directory of Open Access Journals (Sweden)

    Phillip A. Sanger

    2011-07-01

    Full Text Available

    Abstract ¾ Many students are uncomfortable with real world engineering problems where needs and requirements must be concretely defined and the selection of design solutions is not black and white. This paper describes a two semester, multi-disciplinary senior capstone project for students from three Engineering and Technology Department programs (electrical engineering, electrical and computer engineering technology, and engineering technology that brings together the tools of project management and the creative product development process into industry sponsored projects.  The projects are fully integrated with the Center for Rapid Product Realization with its dual goals of economic development and enhanced learning.  The stage/gate development process is used with six formal reviews covering the development of the proposal through to the fabrication and testing of the project’s output.  Over the past four years thirty five (35 projects have been undertaken with students getting an exciting

  15. Project INTEGRATE - a common methodological approach to understand integrated health care in Europe

    Directory of Open Access Journals (Sweden)

    Lucinda Cash-Gibson

    2014-12-01

    Full Text Available Background: The use of case studies in health services research has proven to be an excellent methodology for gaining in-depth understanding of the organisation and delivery of health care. This is particularly relevant when looking at the complexity of integrated healthcare programmes, where multifaceted interactions occur at the different levels of care and often without a clear link between the interventions (new and/or existing and their impact on outcomes (in terms of patients health, both patient and professional satisfaction and cost-effectiveness. Still, integrated care is seen as a core strategy in the sustainability of health and care provision in most societies in Europe and beyond. More specifically, at present, there is neither clear evidence on transferable factors of integrated care success nor a method for determining how to establish these specific success factors. The drawback of case methodology in this case, however, is that the in-depth results or lessons generated are usually highly context-specific and thus brings the challenge of transferability of findings to other settings, as different health care systems and different indications are often not comparable. Project INTEGRATE, a European Commission-funded project, has been designed to overcome these problems; it looks into four chronic conditions in different European settings, under a common methodology framework (taking a mixed-methods approach to try to overcome the issue of context specificity and limited transferability. The common methodological framework described in this paper seeks to bring together the different case study findings in a way that key lessons may be derived and transferred between countries, contexts and patient-groups, where integrated care is delivered in order to provide insight into generalisability and build on existing evidence in this field.Methodology: To compare the different integrated care experiences, a mixed-methods approach has

  16. Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Abdelghani, A.

    1994-06-01

    Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

  17. Choosing the Right Integrator for Your Building Automation Project.

    Science.gov (United States)

    Podgorski, Will

    2002-01-01

    Examines the prevailing definitions and responsibilities of product, network, and system integrators for building automation systems; offers a novel approach to system integration; and sets realistic expectations for the owner in terms of benefits, outcomes, and overall values. (EV)

  18. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  19. Quarterly oil statistics. First quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The aim of this report is to provide rapid, accurate and detailed statistics on oil supply and demand in the OECD area. Main components of the system are: complete balances of production, trade, refinery intake and output, final consumption, stock levels and changes; separate data for crude oil, NGL, feedstocks and nine product groups; separate trade data for main product groups, LPG and naphtha; imports for 41 origins; exports for 29 destinations; marine bunkers and deliveries to international civil aviation by product group; aggregates of quarterly data to annual totals; and natural gas supply and consumption.

  20. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  1. Towards the automotive HMI of the future: Overview of the AIDE - Integrated project results

    NARCIS (Netherlands)

    Amditis, A.; Andreone, L.; Pagle, K.; Markkula, G.; Deregibus, E.; Romera Rue, M.; Bellotti, F.; Engelsberg, A.; Brouwer, R.; Peters, B.; Gloria, A. de

    2010-01-01

    The Adaptive Integrated Driver-vehicle interfacE (AIDE) is an integrated project funded by the European Commission in the Sixth Framework Programme. The project, which involves 31 partners from the European automotive industry and academia, deals with behavioral and technical issues related to

  2. Collaborative Teaching and Learning through Multi-Institutional Integrated Group Projects

    Science.gov (United States)

    Long, Suzanna K.; Carlo, Héctor J.

    2013-01-01

    This teaching brief describes an innovative multi-institutional initiative through which integrated student groups from different courses collaborate on a common course project. In this integrated group project, students are asked to design a decentralized manufacturing organization for a company that will manufacture industrial Proton-Exchange…

  3. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  4. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Systems Integration and Operationalization (SIO) Demonstration

    Science.gov (United States)

    Swieringa, Kurt

    2018-01-01

    The UAS-NAS Project hosted a Systems Integration Operationalization (SIO) Industry Day for the SIO Request for Information (RFI) on November 30, 2017 in San Diego, California. This presentation is being presented to the same group as a follow up regarding the progress that the UAS-NAS project has made on the SIO RFI. The presentation will be virtual with a teleconference

  5. Trend chart: photovoltaic solar energy. Forth quarter 2016

    International Nuclear Information System (INIS)

    Coltier, Yves

    2017-02-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  6. Wind/photovoltaic power indicators. Second quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2015-08-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  7. Wind/photovoltaic power indicators. Third quarter 2011

    International Nuclear Information System (INIS)

    Thienard, Helene

    2011-11-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  8. Wind/photovoltaic power indicators. Third quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-11-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  9. Wind/photovoltaic power indicators. Fourth quarter 2012

    International Nuclear Information System (INIS)

    Reynaud, Didier; Thienard, Helene

    2013-02-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status. (J.S.)

  10. Wind/photovoltaic power indicators. Third quarter 2010

    International Nuclear Information System (INIS)

    Thienard, Helene

    2010-11-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  11. Wind/photovoltaic power indicators. Fourth quarter 2013

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-02-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status

  12. Wind/photovoltaic power indicators. Third quarter 2013

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2013-11-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status

  13. Wind/photovoltaic power indicators. Fourth quarter 2011

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-02-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  14. Trend chart: photovoltaic solar energy. Third quarter 2016

    International Nuclear Information System (INIS)

    Coltier, Yves

    2016-11-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  15. Trend chart: photovoltaic solar energy. Forth quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-02-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  16. Trend chart: photovoltaic solar energy. First quarter 2017

    International Nuclear Information System (INIS)

    2017-05-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  17. Wind/photovoltaic power indicators. Third quarter 2012

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-11-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  18. Wind/photovoltaic power indicators. First quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-05-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status

  19. Wind/photovoltaic power indicators. Second quarter 2012

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-09-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  20. Wind/photovoltaic power indicators. First quarter 2013

    International Nuclear Information System (INIS)

    Reynaud, Didier; Thienard, Helene

    2013-06-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status. (J.S.)

  1. Wind/photovoltaic power indicators. Forth quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2015-02-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  2. Wind/photovoltaic power indicators. Second quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-08-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  3. Wind/photovoltaic power indicators. First quarter 2012

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-06-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  4. Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria

    Directory of Open Access Journals (Sweden)

    Martin O. Dada

    2012-07-01

    Full Text Available Conflicts in any organization can either be functional or dysfunctional and can contribute to or detract from the achievement of organizational or project objectives. This study investigated the frequency and intensity of conflicts, using five conflict centers, on projects executed with either the integrated or traditional method in Nigeria. Questionnaires were administered through purposive and snowballing techniques on 274 projects located in twelve states of Nigeria and Abuja. 94 usable responses were obtained. The collected data were subjected to both descriptive and inferential statistical analysis. In projects procured with traditional methods, conflicts relating to resources for project execution had the greatest frequency, while conflicts around project/client goals had the least frequency. For projects executed with integrated methods, conflicts due to administrative procedures were ranked highest while conflicts due to project/client goals were ranked least. Regarding seriousness of conflict, conflicts due to administrative procedures and resources for project execution were ranked highest respectively for projects procured with traditional and integrated methods. Additionally, in terms of seriousness, personality issues and project/client goals were the least sources of conflict in projects executed with traditional and integrated methods. There were no significant differences in the incidence of conflicts, using the selected conflict centers, between the traditional and integrated procurement methods. There was however significant difference in the intensity or seriousness of conflicts between projects executed with the traditional method and those executed with integrated methods in the following areas: technical issues, administrative matters and personality issues. The study recommends that conscious efforts should be made at teambuilding on projects executed with integrated methods.

  5. Integrating HCI Specialists into Open Source Software Development Projects

    Science.gov (United States)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  6. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  7. The Impact of Organizational Knowledge Integrators on Cooperative R&D Projects

    DEFF Research Database (Denmark)

    Bulathsinhala, Nadika

    2014-01-01

    This paper addresses the fact that R&D projects that incorporate external knowledge sources not only depend on the number of sources, but also on integrating the right source. An organizational knowledge integrator has a natural interest due to its position in the value chain and the technology...... phase to pull the knowledge from earlier phases of development closer towards commercialization. The aim of the paper is to examine if organizational knowledge integrators in R&D projects have a positive impact on innovative performance compared to projects that do not involve a knowledge integrator...

  8. BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1980-03-20

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  9. Toward an integrated storm surge application: ESA Storm Surge project

    Science.gov (United States)

    Lee, Boram; Donlon, Craig; Arino, Olivier

    2010-05-01

    Storm surges and their associated coastal inundation are major coastal marine hazards, both in tropical and extra-tropical areas. As sea level rises due to climate change, the impact of storm surges and associated extreme flooding may increase in low-lying countries and harbour cities. Of the 33 world cities predicted to have at least 8 million people by 2015, at least 21 of them are coastal including 8 of the 10 largest. They are highly vulnerable to coastal hazards including storm surges. Coastal inundation forecasting and warning systems depend on the crosscutting cooperation of different scientific disciplines and user communities. An integrated approach to storm surge, wave, sea-level and flood forecasting offers an optimal strategy for building improved operational forecasts and warnings capability for coastal inundation. The Earth Observation (EO) information from satellites has demonstrated high potential to enhanced coastal hazard monitoring, analysis, and forecasting; the GOCE geoid data can help calculating accurate positions of tide gauge stations within the GLOSS network. ASAR images has demonstrated usefulness in analysing hydrological situation in coastal zones with timely manner, when hazardous events occur. Wind speed and direction, which is the key parameters for storm surge forecasting and hindcasting, can be derived by using scatterometer data. The current issue is, although great deal of useful EO information and application tools exist, that sufficient user information on EO data availability is missing and that easy access supported by user applications and documentation is highly required. Clear documentation on the user requirements in support of improved storm surge forecasting and risk assessment is also needed at the present. The paper primarily addresses the requirements for data, models/technologies, and operational skills, based on the results from the recent Scientific and Technical Symposium on Storm Surges (www

  10. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  11. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  12. Enhancing Integrative Motivation: The Japanese-American Collaborative Learning Project

    Science.gov (United States)

    Kato, Fumie

    2016-01-01

    The Collaborative Learning Project is a language exchange program in which American and Japanese university students have the opportunity to interact with native speakers over the course of a three-week period. This paper reports the outcomes of the Collaborative Learning Project in terms of its effectiveness in fulfilling student expectations and…

  13. An integrative framework for managing project issues across stakeholder groups

    NARCIS (Netherlands)

    van Offenbeek, Marjolein A.G.; Vos, Janita F.J.

    2016-01-01

    The stakeholders and the issues associated with a project are different concepts but closely interconnected. Despite this, the project stakeholder management literature falls short in analyzing the linkages between the stakeholders and the issues they bring. This paper develops a multilayered

  14. Integrating Social and Traditional Media in the Client Project

    Science.gov (United States)

    Melton, James; Hicks, Nancy

    2011-01-01

    Based on a client project assigned to students in two undergraduate business classes, this article argues that social media learning is best done in a context that mixes social media with more traditional kinds of media. Ideally, this approach will involve teams of students who are working on different aspects of a larger client project. This…

  15. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

  16. Using Action Research Projects to Examine Teacher Technology Integration Practices

    Science.gov (United States)

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  17. Overview of NREL Distribution Grid Integration Cost Projects

    Energy Technology Data Exchange (ETDEWEB)

    Horowitz, Kelsey A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ding, Fei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mather, Barry A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Palmintier, Bryan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Denholm, Paul L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-12

    This presentation was given at the 2017 NREL Workshop 'Benchmarking Distribution Grid Integration Costs Under High Distributed PV Penetrations.' It provides a brief overview of recent and ongoing NREL work on distribution system grid integration costs, as well as challenges and needs from the community.

  18. The AMTEX Partnership{trademark}. Fourth quarter FY95 report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. The operations and program management of the AMTEX Partnership{trademark} is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership. Progress is reported on the following projects: computer-aided fabric evaluation; cotton biotechnology; demand activated manufacturing architecture; electronic embedded fingerprints; on-line process control for flexible fiber manufacturing; rapid cutting; sensors for agile manufacturing; and textile resource conservation.

  19. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  20. EMSL Quarterly Highlights Report: 1st Quarter, FY08

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-01-28

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  1. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  2. UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3. Revision E

    Science.gov (United States)

    Marston, Michael

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  3. South African Crime Quarterly

    African Journals Online (AJOL)

    South African Crime Quarterly is an inter-disciplinary peer-reviewed journal that promotes professional discourse and the publication of research on the subjects of crime, criminal justice, crime prevention, and related matters including state and non-state responses to crime and violence. South Africa is the primary focus for ...

  4. English Leadership Quarterly, 1993.

    Science.gov (United States)

    Strickland, James, Ed.

    1993-01-01

    These four issues of the English Leadership Quarterly represent those published during 1993. Articles in number 1 deal with parent involvement and participation, and include: "Opening the Doors to Open House" (Jolene A. Borgese); "Parent/Teacher Conferences: Avoiding the Collision Course" (Robert Perrin); "Expanding Human…

  5. Quarterly fiscal policy

    NARCIS (Netherlands)

    Kendrick, D.A.; Amman, H.M.

    2014-01-01

    Monetary policy is altered once a month. Fiscal policy is altered once a year. As a potential improvement this article examines the use of feedback control rules for fiscal policy that is altered quarterly. Following the work of Blinder and Orszag, modifications are discussed in Congressional

  6. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  7. UAS Integration in the NAS Project and Future Autonomy Research

    Science.gov (United States)

    Johnson, Charles W.

    2014-01-01

    This presentation highlights NASA use of unmanned aircraft systems (UAS) and related technologies for civil purposes. This briefing will give more insight into the UAS projects progress and future goals.

  8. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  9. Numerical modeling in photonic crystals integrated technology: the COPERNICUS Project

    DEFF Research Database (Denmark)

    Malaguti, Stefania; Armaroli, Andrea; Bellanca, Gaetano

    2011-01-01

    Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project.......Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project....

  10. ER Consolidated Quarterly Report October 2014

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective actions and related Long- Term Stewardship (LTS) activities being implemented by Sandia National Laboratories, New Mexico (SNL/NM) ER for the April, May, and June 2014 quarterly reporting period. Section 2.0 provides the status of ER Operations activities including closure activities for the Mixed Waste Landfill (MWL), project management and site closure, and hydrogeologic characterizations. Section 3.0 provides the status of LTS activities that relate to the Chemical Waste Landfill (CWL) and the associated Corrective Action Management Unit (CAMU). Section 4.0 provides the references noted in Section I of this report.

  11. Trend chart: photovoltaic solar energy. Second quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-08-01

    This newsletter presents a quarterly review of the French photovoltaic park situation: evolution of the connected power, new connected facilities, production by power range, ongoing projects and regional statistics (number of facilities, power, distribution, evolution)

  12. Trend chart: photovoltaic solar energy. First quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-05-01

    This newsletter presents a quarterly review of the French photovoltaic park situation: evolution of the connected power, new connected facilities, production by power range, ongoing projects and regional statistics (number of facilities, power, distribution, evolution)

  13. Quarterly environmental data summary for third quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    McCracken, Stephen H. [Weldon Spring Site, St. Charles, MO (United States)

    1999-11-05

    A copy of the quarterly Environmental Data Summary (QEDS) for the third quarter of 1999 is enclosed. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the WSSRAP verification group and merged into the data base during the third quarter of 1999. Selected KPA results for on-site total uranium analyses performed during the quarter are also included. Air monitoring data presented are the most recent complete sets of quarterly data.

  14. Managing wildland fires: integrating weather models into fire projections

    Science.gov (United States)

    Anne M. Rosenthal; Francis Fujioka

    2004-01-01

    Flames from the Old Fire sweep through lands north of San Bernardino during late fall of 2003. Like many Southern California fires, the Old Fire consumed susceptible forests at the urban-wildland interface and spread to nearby city neighborhoods. By incorporating weather models into fire perimeter projections, scientist Francis Fujioka is improving fire modeling as a...

  15. The integrated hydroelectric uses in brazilian agricultural projects

    International Nuclear Information System (INIS)

    Martinez, M.L.B.; Violin, A.; Martinez, C.B.; Lima, C.M.B.

    1990-01-01

    This work aims to analyse the advances for the implementation of PCH's in agricultural projects, and advice of interconnection with the local sub-transmission system, in order to maximize the return of the installation investing capital. Also a study case is presented. (author)

  16. Learning in Authentic Contexts: Projects Integrating Spatial Technologies and Fieldwork

    Science.gov (United States)

    Huang, Kuo-Hung

    2011-01-01

    In recent years, professional practice has been an issue of concern in higher education. The purpose of this study is to design students' projects to facilitate collaborative learning in authentic contexts. Ten students majoring in Management Information Systems conducted fieldwork with spatial technologies to collect data and provided information…

  17. Optimizing integrated reference cases in the OCTAVIUS project

    NARCIS (Netherlands)

    Kvamsdal, H.M.; Ehlers, S.; Kather, A.; Khakharia, P.M.; Nienoord, M.; Fosbøl, P.L.

    2016-01-01

    Adding a carbon capture plant to a power plant reduces the efficiency of said power plant. In order to keep this drop in efficiency as small as possible, several optimisation studies are performed in the OCTAVIUS project. Based on the work of the European Benchmarking Task Force-EBTF within the

  18. Environmental Biosciences Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2007-01-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this

  19. The Book Trailer Project: Media Production within an Integrated Classroom

    Science.gov (United States)

    Festa, Karen

    2017-01-01

    A special education co-teacher in an integrated elementary classroom describes key aspects of media literacy pedagogy for all students, including opportunities for critical analysis and creative media production. After elementary school students learned about author's craft, purpose, theme/message, three types of writing, and target audience, they…

  20. Chapter 1: Overview of the integrated landscape assessment project

    Science.gov (United States)

    Miles A. Hemstrom; Jessica E. Halofsky; F. Jack Triepke; R. James Barbour; Janine Salwasser

    2014-01-01

    Fire suppression, vegetation management activities, wildfires, grazing, climate change, and other factors result in constantly changing vegetation and habitat conditions across millions of hectares in the Western United States. In recent years, the size and number of large wildfires has grown, threatening lives, property, and ecosystem integrity. At the same time,...

  1. Inter-organizational collaboration projects in the public sector: a balance between integration and demarcation.

    Science.gov (United States)

    Löfström, Mikael

    2010-01-01

    For several years, the development of the Swedish public sector has been accompanied by a discussion about inter-organizational collaboration, which has been examined in several national experiments. The experience, however, indicates significant difficulties in implementing collaboration in local authorities' regular activities. This article argues that organizing inter-organizational collaboration in projects tends to be counterproductive, since the purpose of this collaboration is to increase the integration of local authorities. This article is based on case studies of three different collaboration projects. Each project is analyzed in relation to the way collaboration is organized within the project and how the relationship to the local authorities' activities is designed. The outcome of these studies shows that while collaboration projects increase integration between the responsible authorities, the integration stays within the projects. This is due to the fact that the projects were designed as units separate from the responsible authorities. As a result, the collaboration that occurs in the projects is not implemented in the local authorities' activities, and the viability of the increased integration of different responsible authorities does not extend beyond the projects. Copyright (c) 2009 John Wiley & Sons, Ltd.

  2. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  3. Conceptual plan for closer integration of network- and project-level pavement management

    Science.gov (United States)

    1998-01-01

    This report presents an evaluation of current performance modeling concepts and a feasibility study of the possibility of integrating network- and project-level performance prediction. The widely differing modeling methods in use today are reviewed a...

  4. Requirement Volatility, Standardization and Knowledge Integration in Software Projects: An Empirical Analysis on Outsourced IS Development Projects

    Directory of Open Access Journals (Sweden)

    Rajesri Govindaraju

    2015-08-01

    Full Text Available Information systems development (ISD projects are highly complex, with different groups of people having  to collaborate and exchange their knowledge. Considering the intensity of knowledge exchange that takes place in outsourced ISD projects, in this study a conceptual model was developed, aiming to examine the influence of four antecedents, i.e. standardization, requirement volatility, internal integration, and external integration, on two dependent variables, i.e. process performance and product performance. Data  were collected from 46 software companies in four big cities in Indonesia. The collected data were examined to verify the proposed theoretical model using the partial least square structural equation modeling (PLS-SEM technique. The results show that process performance is significantly influenced by internal integration and standardization, while product performance is  significantly influenced by external integration and  requirement volatility. This study contributes  to a better understanding of how knowledge integration can be managed in outsourced ISD projects in view of increasing their success.

  5. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  6. Photovoltaic module with integrated power conversion and interconnection system - the European project PV-MIPS

    OpenAIRE

    Henze, N.; Engler, A.; Zacharias, P.

    2006-01-01

    Within the 6th framework program funded by the European Commission the project PV-MIPS (Photovoltaic Module with Integrated Power Conversion System) was launched in November 2004. Together with eleven European partners from Germany, Austria, Greece and the Netherlands a solar module with integrated in-verter shall be developed that can feed solar electricity directly into the grid. The challenging objective of the project is to reduce the total costs of a PV system. At the same time lifetime ...

  7. Path integral for spinning particle in the plane wave field: Global and local projections

    International Nuclear Information System (INIS)

    Boudiaf, N.; Boudjedaa, T.; Chetouani, L.

    2001-01-01

    The Green function related to the problem of a Dirac particle interacting with a plane wave is calculated via the path integral formalism proposed recently by Alexandrou et al. according to the two so-called global and local projections. With the help of the incorporation of two simple identities, it is shown that the contribution to the calculation of the integrals comes essentially from classical solutions projected along the direction of wave propagation. (orig.)

  8. VIRTUAL REALITY-BASED CLOUD BIM PLATFORM FOR INTEGRATED AEC PROJECTS

    OpenAIRE

    Goulding, Jack Steven; Pour Rahimian Leilabadi, Farzad; Wang, Xiangyu

    2014-01-01

    Building Information Modelling (BIM) has demonstrated the need for integrating collaborative design teams’ “project data”, to not only help coordinate the design, engineering, fabrication, construction, and maintenance of various trades, but also facilitate project integration and interchange. Numerous potential benefits have inspired several countries to consider the implications of implementing BIM Level 3 (Cloud) as an innovative way of further enhancing the design, management and delivery...

  9. The integrated project: a promising promotional strategy for primary health care.

    Science.gov (United States)

    Daniel, C; Mora, B

    1985-10-01

    The integrated project using parasite control and nutrition as entry points for family planning practice has shown considerable success in promoting health consciousness among health workers and project beneficiaries. This progress is evident in the Family Planning, Parasite Control and Nutrition (FAPPCAN) areas. The project has also mobilized technical and financial support from the local government as well as from private and civic organizations. The need for integration is underscored by the following considerations: parasite control has proved to be effective for preventive health care; the integrated project uses indigenous community health workers to accomplish its objectives; the primary health care (PHC) movement depends primarily on voluntary community participation and the integrated project has shown that it can elicit this participation. The major health problems in the Philippines are: a prevalence of communicable and other infectious diseases; poor evironmental sanitation; malnutrition; and a rapid population growth rate. The integrated program utilizes the existing village health workers in identifying problems related to family planning, parasite control and nutrition and integrates these activities into the health delivery system; educates family members on how to detect health and health-related problems; works out linkages with government agencies and the local primary health care committee in defining the scope of health-related problems; mobilizes community members to initiate their own projects; gets the commitment of village officials and committe members. The integrated project operates within the PHC. A health van with a built-in video playback system provides educational and logistical support to the village worker. The primary detection and treatment of health problems are part of the village health workers' responsibilities. Research determines the project's capability to reactivate the village primary health care committees and sustain

  10. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  11. MATERA CITTÀ NARRATA PROJECT: AN INTEGRATED GUIDE FOR MOBILE SYSTEMS

    Directory of Open Access Journals (Sweden)

    E. Pietroni

    2012-09-01

    Full Text Available Matera città Narrata is a project coordinated by CNR ITABC and financed by the Agency of Tourist Promotion of Basilicata region, aimed to the creation of a digital platform able to support the public before and during the visit of Matera (World Heritage since 1993, providing cultural contents by multiple communicative formats and access possibilities. The main components of the project are: 1 the web site, accessible in remote and adapted also from smartphone, 2 cultural contents and applications for mobile devices (old style mobile phone, smartphone, iPad with different operative systems. Every user can reach cultural contents in a simple way, choosing the communicative format he prefers and supported by the technology he owns. The access is totally free for public. In this paper we'll describe, more in detail, the application developed for iPad.

  12. EDF - Quarterly Financial Information

    International Nuclear Information System (INIS)

    Trivi, Carole; Boissezon, Carine de; Hidra, Kader

    2014-01-01

    EDF's sales in the first quarter of 2014 were euro 21.2 billion, down 3.9% from the first quarter of 2013. At constant scope and exchange rates, sales were down 4.2% due to mild weather conditions, which impacted sales of electricity in France, gas sales abroad and trading activities in Europe. UK sales were nonetheless sustained by B2B sales due to higher realised wholesale market prices. In Italy, sales growth was driven by an increase in electricity volumes sold. The first quarter of 2014 also saw the strengthening of the Group's financial structure with the second phase of its multi-annual hybrid funding programme (nearly euro 4 billion equivalent) as well as the issue of two 100-year bonds in dollars and sterling aimed at significantly lengthening average debt maturity. 2014 outlook and 2014-2018 vision: - EDF Group has confirmed its financial objectives for 2014; - Group EBITDA excluding Edison: organic growth of at least 3%; - Edison EBITDA: recurring EBITDA target of euro 1 billion and at least euro 600 million in 2014 before effects of gas contract re-negotiations; - Net financial debt / EBITDA: between 2x and 2.5x; - Pay-out ratio of net income excluding non-recurring items post-hybrid: 55% to 65%. The Group has reaffirmed its goal of achieving positive cash flow after dividends, excluding Linky, in 2018

  13. Institutional educational projects in Colombia facing school integration

    Directory of Open Access Journals (Sweden)

    Lilian Caicedo Obando

    2004-02-01

    Full Text Available Nowadays, more than before people talks about the importance to pay attention to the particularity, and this concept has had different conceptions: starting with the incapacity, concept understood like the feature which make a subject different from the others. Other concept is vulnerability which require special attention by the same society that has produced this. Education is one of the most important aspects in the attention. And what is happening inside the educative institutions is not the result of only one way to face and understand the situation that imply the subjects integration since the particularity many senses are assumed in relation with the conception of: subject, school, integration. For this reason, in this article the instrumental, strategic and complex senses are analysed. 

  14. Affordable Integrated Technology Projects Science Education towards New Horizons

    Science.gov (United States)

    Paoletti, Franco; Carlucci, Lisa Marie

    2009-03-01

    The new-era concept of education supports a type of instruction whereby technology directly acts as a conduit of change, fundamentally altering what is learned, how it is learned, and the role of the educator in the classroom. In our current world, the learning about technology itself has become a goal and a means to successful participation in today's society. Efficient integration of technology to enhance and support the educational process will: 1) provide educators with the resources and the freedom to actualize innovative educational programs; 2) allow educators to be successful in challenging each student to reach his/her highest potential to ultimately increase academic achievement. This study analyzes what technology integration into education means identifying the benefits and the challenges that educators need to meet in order to be successful in their efforts while providing examples of how to successfully implement effective programs under budgetary constraints.

  15. Steam-Generator Integrity Program/Steam-Generator Group Project

    International Nuclear Information System (INIS)

    1982-10-01

    The Steam Generator Integrity Program (SGIP) is a comprehensive effort addressing issues of nondestructive test (NDT) reliability, inservice inspection (ISI) requirements, and tube plugging criteria for PWR steam generators. In addition, the program has interactive research tasks relating primary side decontamination, secondary side cleaning, and proposed repair techniques to nondestructive inspectability and primary system integrity. The program has acquired a service degraded PWR steam generator for research purposes. This past year a research facility, the Steam Generator Examination Facility (SGEF), specifically designed for nondestructive and destructive examination tasks of the SGIP was completed. The Surry generator previously transported to the Hanford Reservation was then inserted into the SGEF. Nondestructive characterization of the generator from both primary and secondary sides has been initiated. Decontamination of the channelhead cold leg side was conducted. Radioactive field maps were established in the steam generator, at the generator surface and in the SGEF

  16. Plant life management in Belgium: an integrated project

    International Nuclear Information System (INIS)

    Wacquier, W.; Smet, M. de; Hennart, J.C.; Greer, J.L.; Breesch, Ch.; Havard, P.

    2001-01-01

    In Belgium, a specific plant life management project, named ''Continuous Operation of Belgian NPPs'' is currently developing. Its final objective is to centralize all safety and economic aspects of plant life management in order to determine, for each NPP unit, the optimal actions required to maintain their safe and reliable operation. As the lifetime of safety-related active components is permanently controlled by the current maintenance programs, the project focuses only on passive safety-related components and on non-safety components important for the availability of the plants. These structures and components were evaluated and compared on the basis of a set of weighted criteria in order to measure their criticality and to identify those which must be considered in the project. The selection and the ranking of those components is based on the KBM TM methodology (Knowledge Based Maintenance). This methodology facilitates the collection, formalization and exchange of know-how and gives immediate results thanks to a sequential and systematic step by step analysis. (author)

  17. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  18. Project Orion, Environmental Control and Life Support System Integrated Studies

    Science.gov (United States)

    Russell, James F.; Lewis, John F.

    2008-01-01

    Orion is the next vehicle for human space travel. Humans will be sustained in space by the Orion subystem, environmental control and life support (ECLS). The ECLS concept at the subsystem level is outlined by function and technology. In the past two years, the interface definition with other subsystems has increased through different integrated studies. The paper presents the key requirements and discusses three recent studies (e.g., unpressurized cargo) along with the respective impacts on the ECLS design moving forward.

  19. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    International Nuclear Information System (INIS)

    Zhang Jianjun; Fu Meichen; Geng Yuhuan; Tao Jin

    2011-01-01

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  20. MODEL OF INTEGRATED VALUE OF PROJECTS IN THE FIELD OF ALTERNATIVE ENERGY

    Directory of Open Access Journals (Sweden)

    Наталія Ігорівна БОРИСОВА

    2015-05-01

    Full Text Available Development of alternative energy sources requires the implementation of complex problems, the solution of which is necessary to apply the project approach. The uniqueness of alternative energy projects (AEP necessitates individual approach to evaluating the effectiveness of each. The paper contains the results of the project management features's analysis in the field of alternative energy, determining the values and developing of the value management integrated conceptual model of AEP. In assessing the effectiveness of AEP considered the socio-economic and commercial aspects. Value management integrated conceptual model of AEP was obtained by combining the classical model of the project management goals with the project values model "Five "E" and two "A". The classical model of the project management goals have been complemented with risk parameters.

  1. The interplay between formal and informal contracting in integrated project delivery

    NARCIS (Netherlands)

    Bygballe, L.E.; Dewulf, Geert P.M.R.; Levitt, R.

    2015-01-01

    This research examines the interplay between formal and informal contracting in integrated project delivery (IPD). It investigates how the interplay enables parties in health-care construction projects to cope with uncertainty and complexities, due to, among others, changing demands. New delivery

  2. The integrated project SOFC600 development of low-temperature SOFC

    DEFF Research Database (Denmark)

    Rietveld, B.; Van Berkel, F.; Zhang-Steenwinkel, Y.

    2009-01-01

    The Integrated Project SOFC600 unites 21 partners jointly working on the research and development of SOFC stack components for operation at 600oC. The project is funded by the European Commission within the 6th Framework Programme. Low-temperature operation is considered essential for achieving c...

  3. Integration and the hold-up problem in the design organization for engineering projects

    NARCIS (Netherlands)

    Zerjav, Vedran; Hartmann, Timo; Javernick-Will, A.; Chinowsky, P.

    2012-01-01

    The paper presents a perspective of the design organization in engineering projects based on the economic concept of the hold-up problem. By integrating the economic theories on the boundaries of organizations into the existing knowledge on design in engineering projects, the paper hypothesizes a

  4. Integrating Organizational Learning and Business Praxis: A Case for Intelligent Project Management.

    Science.gov (United States)

    Cavaleri, Steven A.; Fearon, David S.

    2000-01-01

    Project management provides a natural home for organizational learning, freeing it from mechanical processes. Organizational learning plays a critical role in intelligent project management, which combines manageability, performance outcomes of knowledge management, and innovation. Learning should be integrated into an organization's core…

  5. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  6. Campus Eco Tours: An Integrative & Interactive Field Project for Undergraduate Biology Students

    Science.gov (United States)

    Boes, Katie E.

    2013-01-01

    Outdoor areas within or near college campuses offer an opportunity for biology students to observe the natural world and apply concepts from class. Here, I describe an engaging and integrative project where undergraduate non-major biology students work in teams to develop and present professional "eco tours." This project takes place over multiple…

  7. Fuels planning: science synthesis and integration; fact sheet: The Fuels Synthesis Project overview

    Science.gov (United States)

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    The geographic focus of the "Fuels Planning: Science Synthesis and Integration" project #known as the Fuels Synthesis Project# is on the dry forests of the Western United States. Target audiences include fuels management specialists, resource specialists, National Environmental Policy Act #NEPA# planning team leaders, line officers in the USDA Forest Service...

  8. STYLE - A European Project on Structural Integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The overall objective of STYLE is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of components relevant to ageing and life time management and to support the integration of the knowledge created in the project into main-stream nuclear industry assessment codes.

  9. Merging Regular and Special Education Teacher Preparation Programs: The Integrated Special Education-English Project (ISEP).

    Science.gov (United States)

    Miller, Darcy E.

    1991-01-01

    Describes the Integrated Special Education-English Project (ISEP) which facilitated the gradual integration of special education and English teacher preparation programs. A description of the ISEP model and a case study are included. The case study indicated student teachers who participated in the ISEP improved special education and English…

  10. The paradigm of consumer-driven and responsive supply chains: An integrated project approach

    NARCIS (Netherlands)

    Zimmermann, K.L.; Lans, van der I.A.

    2009-01-01

    This paper describes an integrated project approach that forms the basis of the studies on consumer-driven innovative and responsive supply chains in ISAFRUIT Pillar 1. This integrated approach leads to a wide range of indepth results on trends, preferences, and innovativeness of the European

  11. Wolsong 2, 3, and 4 quarterly progress review report on NSSS design and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Sung Hoon; Kim, Sun Kee; Park, Tae Keun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-01-01

    This is the Quarterly Progress Review Report for Wolsong NPP 2, 3 and 4 NSSS Design and Engineering which evaluates the performance of the project and describes the project highlight, manpower loading status, design and engineering and project related meetings by quarterly basis. 29 figs., 16 tabs. (Author).

  12. Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria

    OpenAIRE

    Martin O. Dada

    2012-01-01

    Conflicts in any organization can either be functional or dysfunctional and can contribute to or detract from the achievement of organizational or project objectives. This study investigated the frequency and intensity of conflicts, using five conflict centers, on projects executed with either the integrated or traditional method in Nigeria. Questionnaires were administered through purposive and snowballing techniques on 274 projects located in twelve states of Nigeria and Abuja. 94 usable ...

  13. Meeting of Experts on NASA's Unmanned Aircraft System (UAS) Integration in the National Airspace Systems (NAS) Project

    Science.gov (United States)

    Wolfe, Jean; Bauer, Jeff; Bixby, C.J.; Lauderdale, Todd; Shively, Jay; Griner, James; Hayhurst, Kelly

    2010-01-01

    Topics discussed include: Aeronautics Research Mission Directorate Integrated Systems Research Program (ISRP) and UAS Integration in the NAS Project; UAS Integration into the NAS Project; Separation Assurance and Collision Avoidance; Pilot Aircraft Interface Objectives/Rationale; Communication; Certification; and Integrated Tests and Evaluations.

  14. Integration project of regional markets in Europe (European directive)

    International Nuclear Information System (INIS)

    Gonzalez Fernandez-Castaneda, J. J.

    2010-01-01

    The article presents the current situation of the Day-Ahead electricity markets in the different countries and Regions along West Europe. It describes the different possibilities applied to congestion management in the borders between countries and price areas, and the options employed to couple Day-ahead markets to form regional markets in Europe. Finally, it presents the initiative to Price couple Regional markets (PCR) that is being developed by Nord pool spot, EPEX Spot and OMEL with the objective to advance towards the integration of the markets that they operate in the internal Electricity Market. (Author)

  15. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  16. Integrating mental health services into primary HIV care for women: the Whole Life project.

    OpenAIRE

    Dodds, Sally; Nuehring, Elane M.; Blaney, Nancy T.; Blakley, Theresa; Lizzotte, Jean-Marie; Lopez, Myriam; Potter, JoNell E.; O'Sullivan, Mary J.

    2004-01-01

    The high rate of mental health problems in HIV-infected women jeopardizes the health of this vulnerable population, and constitutes a mandate for integrating mental health services into HIV primary care. The Whole Life project-a collaboration of the departments of Psychiatry and Obstetrics/Gynecology at the University of Miami School of Medicine-successfully integrated mental health services into primary HIV care for women. This article describes the conceptual framework of the integration, i...

  17. Steam generator with integral downdraft dryer. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Hochmuth, F.W.

    1992-02-01

    On June 30, 1989, a financial assistance award was granted by the United State Department of Energy, the purpose of which was to study and evaluate the technical aspect, the economic viability, and commercial possibilities of a new furnace design for burning high moisture cellulose type fuels. The new design is an invention by F.W. Hochmuth, P.Eng. and has received United States Patents Nos. 4,480, 557 and 4,502,397. It was conceived as a method to improve the general operation and efficiency of waste wood burning boilers, to avoid the use of stabilizing fuels such as oil or gas, and to reduce objectionable stack emissions. A further objective was to obtain such benefits at relatively low cost by integrating all new material requirements within the furnace itself thereby avoiding the need for costly external equipment. The proposed integral down-draft dryer avoids the use of external dryer systems that are very expensive, have high power consumption, and require a large amount of maintenance. This document provides the details of this invention.

  18. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex

  19. Amyris, Inc. Integrated Biorefinery Project Summary Final Report - Public Version

    Energy Technology Data Exchange (ETDEWEB)

    Gray, David; Sato, Suzanne; Garcia, Fernando; Eppler, Ross; Cherry, Joel

    2014-03-12

    The Amyris pilot-scale Integrated Biorefinery (IBR) leveraged Amyris synthetic biology and process technology experience to upgrade Amyris’s existing Emeryville, California pilot plant and fermentation labs to enable development of US-based production capabilities for renewable diesel fuel and alternative chemical products. These products were derived semi-synthetically from high-impact biomass feedstocks via microbial fermentation to the 15-carbon intermediate farnesene, with subsequent chemical finishing to farnesane. The Amyris IBR team tested and provided methods for production of diesel and alternative chemical products from sweet sorghum, and other high-impact lignocellulosic feedstocks, at pilot scale. This enabled robust techno-economic analysis (TEA), regulatory approvals, and a basis for full-scale manufacturing processes and facility design.

  20. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR-06 are highlighted, and the future of the two projects is discussed

  1. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  2. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  3. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  4. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  5. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  6. Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects

    International Nuclear Information System (INIS)

    Rosso, M.; Bottero, M.; Pomarico, S.; La Ferlita, S.; Comino, E.

    2014-01-01

    The use of hydroelectric potential and the protection of the river ecosystem are two contrasting aspects that arise in the management of the same resource, generating conflicts between different stakeholders. The purpose of the paper is to develop a multi-level decision-making tool, able to support energy planning, with specific reference to the construction of hydropower plants in mountain areas. Starting from a real-world problem concerning the basin of the Sesia Valley (Italy), an evaluation framework based on the combined use of Multicriteria Evaluation and Stakeholders Analysis is proposed in the study. The results of the work show that the methodology is able to grant participated decisions through a multi-stakeholders traceable and transparent assessment process, to highlight the important elements of the decision problem and to support the definition of future design guidelines. - Highlights: • The paper concerns a multi-level decision-making tool able to support energy planning. • The evaluation framework is based on the use of AHP and Stakeholders Analysis. • Hydropower projects in the Sesia Valley (Italy) are evaluated and ranked in the study. • Environmental, economic, technical and sociopolitical criteria have been considered. • 42 stakeholder groups have been included in the evaluation

  7. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    Energy Technology Data Exchange (ETDEWEB)

    Venetz, Theodore J. [Washington River Protection Solutions, Richland, WA (United States); Washenfelder, Dennis J. [Washington River Protection Solutions, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, Richland, WA (United States); Johnson, Jeremy M. [USDOE Office of River Protection, Richland, WA (United States); Castleberry, Jim L. [Washington River Protection Solutions, Richland, WA (United States)

    2015-01-07

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.

  8. Actinide behavior in the Integral Fast Reactor. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Courtney, J.C.

    1994-11-01

    The Integral Fast Reactor (IFR) under development by Argonne National Laboratory uses metallic fuels instead of ceramics. This allows electrorefining of spent fuels and presents opportunities for recycling minor actinide elements. Four minor actinides ({sup 237}Np, {sup 240}Pu, {sup 241}Am, and {sup 243}Am) determine the waste storage requirements of spent fuel from all types of fission reactors. These nuclides behave the same as uranium and other plutonium isotopes in electrorefining, so they can be recycled back to the reactor without elaborate chemical processing. An experiment has been designed to demonstrate the effectiveness of the high-energy neutron spectra of the IFR in consuming these four nuclides and weapons grade plutonium. Eighteen sets of seven actinide and five light metal targets have been selected for seven day exposure in the Experimental Breeder Reactor-II which serves as a prototype of the IFR. Post-irradiation analyses of the exposed targets by gamma, alpha, and mass spectroscopy are used to determine nuclear reaction rates and neutron spectra. These experimental data increase the authors confidence in their ability to predict reaction rates in candidate IFR designs using a variety of neutron transport and diffusion programs.

  9. Toward integrated opisthorchiasis control in northeast Thailand: the Lawa project.

    Science.gov (United States)

    Sripa, Banchob; Tangkawattana, Sirikachorn; Laha, Thewarach; Kaewkes, Sasithorn; Mallory, Frank F; Smith, John F; Wilcox, Bruce A

    2015-01-01

    Human liver fluke, Opisthorchis viverrini, a food-borne trematode is a significant public health problem in Southeast Asia, particularly in Thailand. Despite a long history of control programmes in Thailand and a nationwide reduction, O. viverrini infection prevalence remains high in the northeastern provinces. Therefore, a new strategy for controlling the liver fluke infection using the EcoHealth/One Health approach was introduced into the Lawa Lake area in Khon Kaen province where the liver fluke is endemic. A programme has been carried using anthelminthic treatment, novel intensive health education methods both in the communities and in schools, ecosystem monitoring and active community participation. As a result, the infection rate in the more than 10 villages surrounding the lake has declined to approximate one third of the average of 50% as estimated by a baseline survey. Strikingly, the Cyprinoid fish species in the lake, which are the intermediate host, now showed less than 1% prevalence compared to a maximum of 70% at baseline. This liver fluke control programme, named "Lawa model," is now recognised nationally and internationally, and being expanding to other parts of Thailand and neighbouring Mekong countries. Challenges to O. viverrini disease control, and lessons learned in developing an integrative control programme using a community-based, ecosystem approach, and scaling-up regionally based on Lawa as a model are described. Copyright © 2014 Elsevier B.V. All rights reserved.

  10. Actinide behavior in the Integral Fast Reactor. Final project report

    International Nuclear Information System (INIS)

    Courtney, J.C.

    1994-11-01

    The Integral Fast Reactor (IFR) under development by Argonne National Laboratory uses metallic fuels instead of ceramics. This allows electrorefining of spent fuels and presents opportunities for recycling minor actinide elements. Four minor actinides ( 237 Np, 240 Pu, 241 Am, and 243 Am) determine the waste storage requirements of spent fuel from all types of fission reactors. These nuclides behave the same as uranium and other plutonium isotopes in electrorefining, so they can be recycled back to the reactor without elaborate chemical processing. An experiment has been designed to demonstrate the effectiveness of the high-energy neutron spectra of the IFR in consuming these four nuclides and weapons grade plutonium. Eighteen sets of seven actinide and five light metal targets have been selected for seven day exposure in the Experimental Breeder Reactor-II which serves as a prototype of the IFR. Post-irradiation analyses of the exposed targets by gamma, alpha, and mass spectroscopy are used to determine nuclear reaction rates and neutron spectra. These experimental data increase the authors confidence in their ability to predict reaction rates in candidate IFR designs using a variety of neutron transport and diffusion programs

  11. IT Requirements Integration in High-Rise Construction Design Projects

    Science.gov (United States)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  12. The Absolutist Reformism: Projects of Political Reforms in Russia (2nd half of 18th century – 1st quarter of 19th century

    Directory of Open Access Journals (Sweden)

    Konstantin D. Bugrov

    2016-09-01

    Full Text Available The article deals with the phenomenon of absolutist reformism – a form of political culture that chronologically spans from the mid-18th century to 19th century, and is determined by both communicative context (genre, pragmatic purpose, and the social and political status of its participants, the members of court-administrative elite. The author argues that the principal reformers, who belonged to the court and administrative elite of Russian Empire, were competing with each other, and the reform proposals allowed the competitors to simultaneously improve their own positions within the structure of state governance and enact the absolute power of the monarch to bring the reform forth. However, that meant that the monarch was appearing in the reform proposals as an omnipotent arbiter capable of creating the social and political institutions by his will. Consequently, these reform proposals – starting from the early projects of the 1750es – 1760es, and finishing with the intense production of reform plans under Alexander I – were aimed at increasing the power of monarch, assuring its benevolent character, and protecting it from the potential usurpation from the inside of the bureaucratic apparatus. This logic of argumentation, which places the monarch against the bureaucracy, was to flourish later on in Russian 19th century.

  13. Power systems development facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This quarterly technical progress report summarizes work completed during the last quarter of the Second Budget Period, January 1 through March 31, 1994, entitled {open_quotes}Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.{close_quotes} The objective of this project is to evaluate hot gas particulate control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  14. Organizational Performance: Integration of the Value, Rarity, Imitability and Organization Framework in Project Management

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-08-01

    Full Text Available Organizational performance is often associated with competitive advantage. In strategy studie saimed at expanding communication on a global vision of organizations and their initiatives, strategic project management stands out, whichis related to the mechanisms and set of management decisions that determine long term organizational performance. This study verify how the Resource-based view adds value to organizational initiatives seeking to achieve organizational performance through projects. The study considers strategic management practiced by the project managers o asto present a conceptual framework with four propositions that demonstrate the integration of the Value, Rarity, Imitability and Organization framework with project management and its relations to organizational performance.

  15. Metallurgical Laboratory (HWMF) Groundwater Monitoring Report, Fourth Quarter 1994

    International Nuclear Information System (INIS)

    Chase, J.A.

    1995-03-01

    Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Units were also similar to previous quarters. During second quarter 1994, SRS received South Carolina Department of Health and Environmental Control approval for constructing five point-of-compliance wells and two plume definition wells near the Met Lab Hazardous Waste Management Facility. This project began in July 1994 and is complete; however, analytical data from these wells are not yet available

  16. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  17. Computer Technology-Integrated Projects Should Not Supplant Craft Projects in Science Education

    Science.gov (United States)

    Klopp, Tabatha J.; Rule, Audrey C.; Schneider, Jean Suchsland; Boody, Robert M.

    2014-01-01

    The current emphasis on computer technology integration and narrowing of the curriculum has displaced arts and crafts. However, the hands-on, concrete nature of craft work in science modeling enables students to understand difficult concepts and to be engaged and motivated while learning spatial, logical, and sequential thinking skills. Analogy…

  18. Application of an integrated model for evaluation and optimization of business projects portfolios

    Directory of Open Access Journals (Sweden)

    Camila Costa Dutra

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio.

  19. APPLICATION OF AN INTEGRATED MODEL FOR EVALUATION AND OPTIMIZATION OF BUSINESS PROJECTS PORTFOLIOS

    Directory of Open Access Journals (Sweden)

    Maria Auxiliadora Cannarozzo Tinoco

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio

  20. Developing integrated parametric planning models for budgeting and managing complex projects

    Science.gov (United States)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  1. INTEGRATING GEOSPATIAL TECHNOLOGIES AND SECONDARY STUDENT PROJECTS: THE GEOSPATIAL SEMESTER

    Directory of Open Access Journals (Sweden)

    Bob Kolvoord

    2012-12-01

    Full Text Available Resumen:El Semestre Geoespacial es una actividad de educación geográfica centrada en que los estudiantes del último curso de secundaria en los institutos norteamericanos, adquieran competencias y habilidades específicas en sistemas de información geográfica, GPS y teledetección. A través de una metodología de aprendizaje basado en proyectos, los alumnos se motivan e implican en la realización de trabajos de investigación en los que analizan, e incluso proponen soluciones, diferentes procesos, problemas o cuestiones de naturaleza espacial. El proyecto está coordinado por la Universidad James Madison y lleva siete años implantándose en diferentes institutos del Estado de Virginia, implicando a más de 20 centros educativos y 1.500 alumnos. Los alumnos que superan esta asignatura de la enseñanza secundaria obtienen la convalidación de determinados créditos académicos de la Universidad de referencia.Palabras clave:Sistemas de información geográfica, enseñanza, didáctica de la geografía, semestre geoespacial.Abstract:The Geospatial Semester is a geographical education activity focused on students in their final year of secondary schools in the U.S., acquiring specific skills in GIS, GPS and remote sensing. Through a methodology for project-based learning, students are motivated and involved in conducting research using geographic information systems and analyze, and even propose solutions, different processes, problems or issues spatial in nature. The Geospatial Semester university management not only ensures proper coaching, guidance and GIS training for teachers of colleges, but has established a system whereby students who pass this course of secondary education gain the recognition of certain credits from the University.Key words:Geographic information system, teaching, geographic education, geospatial semester. Résumé:Le semestre géospatial est une activité axée sur l'éducation géographique des étudiants en derni

  2. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2009-01-30

    Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River

  3. (Shippingport Atomic Power Station). Quarterly operating report, fourth quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    At the beginning of the fourth quarter of 1980, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and testing program, initiated September 12, 1980. Operational testing began on November 7. Maximum power was achieved November 28 and was maintained throughout the remainder of the quarter except as noted. The LWBR Core has generated 19,046.07 EFPH from start-up through the end of the quarter. During this quarter, approximately 0.000025 curies of Xe 133 activity were released from the station. During the fourth quarter of 1980, 1081 cubic feet of radioactive solid waste was shipped out of state for burial. These shipments contained 0.037 curies of radioactivity.

  4. Stakeholder integration and public engagement of EU and national research projects in Germany

    Science.gov (United States)

    Ruhnau, Meike; Guo, Chenbo; Walter, Anastasia; Schneider, Nadine

    2017-04-01

    The talk addresses the feasibility and difficulties of research projects to reach out and to integrate a sufficient number of stakeholders (vgl. Carrada, 2006; Poulsen, 2007; Zikos et al. 2012; Lee & Belohlav, 2014). With "stakeholders" we understand end-users, policy makers, students for capacity building, administrators and interested general public. The design and later the implementation of stakeholder integration and public engagement strongly depend on the priority-setting and requirements of funding agencies (EU [1], DFG, BMBF and the regional ministries in Germany). They affect the size and constellation of consortia as well as the longevity and continuity of research community; on the other hand they also determine the weighting of communication, dissemination, outreach (and networking) activities within the project. For instance by public engagement of EU funded projects a share of 10% for communication and outreach activities was rated as best practices in 2014 [2]. On the national level there is no such appointment so far. In our talk we will quantify and compare activities among selected EU and nationally funded collaborative projects in Germany, address the hurdles, investigate the communication tools, examine the outreach channels and dissemination tactics, reflect the performances and the results achieved so far, with the objective to answer the following questions: - What tools/channels have been applied so far? Were they efficient and expedient? - What can be count as best practices? - Are such activities sustainable at all? The goal of this talk is to show the complexity of the stakeholder integration and public engagement in research projects, to critically assess our experiences gained in past and running projects, and to subsequently have an interactive exchange with other project professionals at EGU. [1] European Commission (2004, 2008, 2010, 2014). Communicating EU research and innovation guidance for project participants; [2] European

  5. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  6. Strategical integration and prior evaluation of science and innovation projects in Ecuadorians sports organizations.

    Directory of Open Access Journals (Sweden)

    Gloria Barroso Rodríguez

    2015-09-01

    Full Text Available This work shows the design of a procedure for evaluating the strategical integration of science and innovation projects level in the physical and sport sphere, and its validation through expert criteria for application to Ecuadorian sports organizations. As a result, it was possible to demonstrate the validity of the procedure designed, so it will be possible to be used to facilitate decision-making in relation to the execution of such projects considering, as a value judgment, the level of their essential components integration for the achievement of objectives aligned to the strategic priorities of the Ecuadorians sports organizations.  

  7. Case study of the interdisciplinary integration in an IST-E3 project

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik

    2002-01-01

    Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission.......Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission....

  8. Online Projective Integral with Proper Orthogonal Decomposition for Incompressible Flows Past NACA0012 Airfoil

    Directory of Open Access Journals (Sweden)

    Sirod Sirisup

    2012-01-01

    the individual function of each POD mode used in the projective integration method. It is found that the first POD mode can capture basic flow behaviors but the overall dynamic is rather inaccurate. The second and the third POD modes assist the first mode by correcting magnitudes and phases of vorticity fields. However, adding the fifth POD mode in the model leads to some incorrect results in phase-shift forms for both drag and lift coefficients. This suggests the optimal number of POD modes to use in the projective integration method.

  9. Financial study of an integrated nuclear desalination system in Tunisia: the Tundesal Project

    International Nuclear Information System (INIS)

    Bouzguenda Benzarti, Neila; Albouy, Michel; Nisan, Simon

    2006-01-01

    This paper focuses on a case study of financing an integrated nuclear desalination system at la Skhira site in Tunisia. More specifically, it shows the financial characteristics of the study, known as the TUNDESAL project, the main financing mechanisms that can be used, and the principal actions required to attract the potential investors and lenders. The paper describes: - The specific financial considerations corresponding to the particular characteristics of nuclear desalination projects: high capital costs, high level of risks and uncertainties, relatively long construction lead times and social and environmental concerns; - The main risks involved in nuclear energy projects; - The profitability study of the TUNDESAL project with the application of the Discounted Cash Flow Analysis; - The main financing sources for the project; - The financing schemes that can be used for project implementation and comparison between these schemes in terms of benefits generated, after covering project costs and repayment of lenders and investors; - The main actions to be done for making the project financially attractive in order to gain the confidence of investors and international financial institutions (optimal allocation of project risks and uncertainties, a suitable and flexible energy and water tariffs policy). Analysis has shown that in particular conditions of Tunisia, the most attractive financial scheme could be the 'project financing + leasing'. (authors)

  10. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  11. Timely integration of safeguards and security with projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Price, R.; Blount, P.M.; Garcia, S.W.; Gonzales, R.L.; Salazar, J.B.; Campbell, C.H.

    2004-01-01

    The Safeguards and Security (S and S) Requirements Integration Team at Los Alamos National Laboratory (LANL) has developed and implemented an innovative management process that will be described in detail. This process systematically integrates S and S planning into construction, facility modifications or upgrades, mission changes, and operational projects. It extends and expands the opportunities provided by the DOE project management manual, DOE M 413.3-1. Through a series of LANL documents, a process is defined and implemented that formally identifies an S and S professional to oversee, coordinate, facilitate, and communicate among the identified S and S organizations and the project organizations over the life cycle of the project. The derived benefits, namely (1) elimination/reduction of re-work or costly retrofitting, (2) overall project cost savings because of timely and improved planning, (3) formal documentation, and (4) support of Integrated Safeguards and Security Management at LANL, will be discussed. How many times, during the construction of a new facility or the modification of an existing facility, have the persons responsible for the project waited until the last possible minute or until after construction is completed to approach the security organizations for their help in safeguarding and securing the facility? It's almost like, 'Oh, by the way, do we need access control and a fence around this building and just what are we going to do with our classified anyway?' Not only is it usually difficult; it's also typically expensive to retrofit or plan for safeguards and security after the fact. Safeguards and security organizations are often blamed for budget overruns and delays in facility occupancy and program startup, but these problems are usually due to poor front-end planning. In an effort to help projects engage safeguards and security in the pre-conceptual or conceptual stages, we implemented a high level formality of operations. We

  12. (Shippingport Atomic Power Station). Quarterly operating report, third quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    Zagorski, J. F.

    1980-01-01

    At the beginning of the third quarter of 1980, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. During the quarter, the Station was operated for Duquesne Light Company System grid including base load and swing load operation. Twelve (12) planned swing load operations were performed on the LWBR Core this quarter to complete the LWBR operating plan of fifty (50) during this operating phase. The Station was shutdown on September 12 for the Fall 1980 Shutdown and remained in this mode through the end of the quarter. The LWBR Core has generated 18,297.98 EFPH from start-up through the end of the quarter. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. The radioactive liquid waste effluent line to the river remained blanked off to prevent inadvertent radioactive liquid waste discharges. During the quarter, approximately 0.001 curies of Xe 133 activity were released from the station. The radioactivity released from Shippingport Station is far too small to have any measurable effect on the general background environmental radioactivity outside the plant.

  13. Integrated learning of mathematics, science and technology concepts through LEGO/Logo projects

    Science.gov (United States)

    Wu, Lina

    This dissertation examined integrated learning in the domains of mathematics, science and technology based on Piaget's constructivism, Papert's constructionism, and project-based approach to education. Ten fifth grade students were involved in a two-month long after school program where they designed and built their own computer-controlled LEGO/Logo projects that required the use of gears, ratios and motion concepts. The design of this study centered on three notions of integrated learning: (1) integration in terms of what educational materials/settings provide, (2) integration in terms of students' use of those materials, and (3) integration in the psychological sense. In terms of the first notion, the results generally showed that the LEGO/Logo environment supported the integrated learning of math, science and technology concepts. Regarding the second notion, the students all completed impressive projects of their own design. They successfully combined gears, motors, and LEGO parts together to create motion and writing control commands to manipulate the motion. But contrary to my initial expectations, their successful designs did not require numerical reasoning about ratios in designing effective gear systems. When they did reason about gear relationships, they worked with "qualitative" ratios, e.g., "a larger driver gear with a smaller driven gear increases the speed." In terms of the third notion of integrated learning, there was evidence in all four case study students of the psychological processes involved in linking mathematical, scientific, and/or technological concepts together to achieve new conceptual units. The students not only made connections between ideas and experiences, but also recognized decisive patterns and relationships in their project work. The students with stronger overall project performances showed more evidence of synthesis than the students with relatively weaker performances did. The findings support the conclusion that all three

  14. Development of generic key performance indicators for PMBOK® using a 3D project integration model

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2013-12-01

    Full Text Available Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

  15. Fast Breeder Project. Second quarterly report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    Research progress is reported on fuel pin development, material studies and development, corrosion tests and coolant analysis, fuel cycle studies, physics experiments, fast reactor safety, instrumentation development, environmental studies, and sodium technology tests. Much of the work had SNR-300 design applications. (U.S.)

  16. Imperial Valley Environmental Project: quarterly data report

    Energy Technology Data Exchange (ETDEWEB)

    Nyholm, R.A.; Anspaugh, L.R. (comps.)

    1977-04-13

    This is a catalog of all samples which have been collected and the presently available results of chemical and other analyses. Types covered include: air quality, water quality, ecosystem quality, subsidence and seismicity, remotely sensed data, socioeconomic effects, and measurements of radioactivity. (MHR)

  17. Supplier integration in product development: A matter of designing the project structure

    Directory of Open Access Journals (Sweden)

    Mike Danilovic

    2007-11-01

    Full Text Available In product development close collaboration between systems integrators and suppliers is important. The purpose of this article is to investigate the impact of the work breakdown structure (WBS and work packages (WPs in product development on the possibility of carrying through the strategy of supplier involvement into collaborative practice and to investigate how supplier involvement can be improved by altering the design of collaborative WBS and WP structures. Dependence Structure Matrix (DSM is introduced in order to analyse, visualise and manage interdependencies, in terms of information exchange between the systems integrator and supplier. This article shows how DSM can support the alternative design of integrated and collaborative WBS and integrated WPs following the logic of dependencies and the flow of information in order to support a strategy focusing on integration of suppliers on project and team level.

  18. 1. annual workshop proceedings of integrated project fundamental processes of radionuclide migration IP Funmig

    International Nuclear Information System (INIS)

    Reiller, P.; Buckau, G.; Kienzler, B.; Duro, L.; Martell, M.

    2006-01-01

    These are the proceedings of the 1. Annual Workshop Proceedings of the Integrated Project FUNMIG (fundamental processes of radionuclide migration). The Annual Workshop was hosted by CEA and held in Saclay, 28 November - 1 December 2005. The project started January 2005 and has a duration of four years. The project makes use of annual workshops bringing the project partners together and inviting external groups to participate and contribute. Consequently, the present proceedings will be followed by another three proceedings from the forthcoming annual workshops to be held the end of 2006, 2007 and 2008. The 2. Annual Workshop will be hosted by SKB and be held in Stockholm, 21-23 November 2006. The proceedings serve several purposes. The key purpose is to document and make available to a broad scientific community the outcome of this project. A considerable part of the project activity reporting is also done through the proceedings. For this reason the first parts of the proceedings are structured around the workshop and the project. A large part of the proceedings, however, also contain individual scientific contributions by the project partners as well as external contributors. Information about the project can be found under www.funmig.com. (authors)

  19. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  20. The Integration of Project-Based Methodology into Teaching in Machine Translation

    Science.gov (United States)

    Madkour, Magda

    2016-01-01

    This quantitative-qualitative analytical research aimed at investigating the effect of integrating project-based teaching methodology into teaching machine translation on students' performance. Data was collected from the graduate students in the College of Languages and Translation, at Imam Muhammad Ibn Saud Islamic University, Riyadh, Saudi…

  1. The Rural Recreation Integration Project: Reaching Out with Interactive Video Technology.

    Science.gov (United States)

    Anderson, Lynn; And Others

    1996-01-01

    North Dakota's Rural Recreation Integration Project disseminates innovative training and technical assistance from therapeutic recreation specialists to recreation and human service providers. The information helps facilitate the inclusion of people with disabilities into recreation/leisure activities. To make the training accessible, they use the…

  2. Vertical and Horizontal Integration of Laboratory Curricula and Course Projects across the Electronic Engineering Technology Program

    Science.gov (United States)

    Zhan, Wei; Goulart, Ana; Morgan, Joseph A.; Porter, Jay R.

    2011-01-01

    This paper discusses the details of the curricular development effort with a focus on the vertical and horizontal integration of laboratory curricula and course projects within the Electronic Engineering Technology (EET) program at Texas A&M University. Both software and hardware aspects are addressed. A common set of software tools are…

  3. Making Communication Matter: Integrating Instruction, Projects and Assignments to Teach Writing and Design

    Science.gov (United States)

    Riddell, William T.; Courtney, Jennifer; Constans, Eric; Dahm, Kevin; Harvey, Roberta; von Lockette, Paris

    2010-01-01

    An integrated technical writing and design course has been developed at Rowan University. This course was developed using aspects of project-based learning and recent discussions about design education, as well as pedagogical approaches from the write-to-learn and the writing in the disciplines (WID) movements. The result is a course where the…

  4. Transport fuel demand responses to fuel price and income projections : Comparison of integrated assessment models

    NARCIS (Netherlands)

    Edelenbosch, O. Y.; van Vuuren, Detlef; Bertram, C.; Carrara, S.; Emmerling, J.; Daly, H.; Kitous, A.; McCollum, D. L.; Saadi Failali, N.

    Income and fuel price pathways are key determinants in projections of the energy system in integrated assessment models. In recent years, more details have been added to the transport sector representation in these models. To better understand the model dynamics, this manuscript analyses transport

  5. 75 FR 60405 - Lincoln National Forest, New Mexico, Integrated Non-Native Invasive Plant Project

    Science.gov (United States)

    2010-09-30

    ... Environmental Impact Statement. SUMMARY: The Lincoln National Forest (LNF) proposes to implement an integrated... by November 29, 2010. The draft environmental impact statement is expected January 2011 and the final environmental impact statement is expected April 2011. ADDRESSES: Send written comments to NNIP Project, Lincoln...

  6. Enhancing the Interdisciplinary Perspective in the Marketing Management Decision Process through an Applied, Integrated, Client Project

    Science.gov (United States)

    Askim-Lovseth, Mary K.; O'Keefe, Timothy P.

    2012-01-01

    Businesses function within a cross-functional, integrative setting, and this necessitates providing a learning environment for students that is comparable to real-life work projects. Two upper-level university classes in marketing and information systems worked collaboratively with a snack food business to design and build a Web site based on a…

  7. An integrated ball projection technology for the study of dynamic interceptive actions.

    Science.gov (United States)

    Stone, J A; Panchuk, D; Davids, K; North, J S; Fairweather, I; Maynard, I W

    2014-12-01

    Dynamic interceptive actions, such as catching or hitting a ball, are important task vehicles for investigating the complex relationship between cognition, perception, and action in performance environments. Representative experimental designs have become more important recently, highlighting the need for research methods to ensure that the coupling of information and movement is faithfully maintained. However, retaining representative design while ensuring systematic control of experimental variables is challenging, due to the traditional tendency to employ methods that typically involve use of reductionist motor responses such as buttonpressing or micromovements. Here, we outline the methodology behind a custom-built, integrated ball projection technology that allows images of advanced visual information to be synchronized with ball projection. This integrated technology supports the controlled presentation of visual information to participants while they perform dynamic interceptive actions. We discuss theoretical ideas behind the integration of hardware and software, along with practical issues resolved in technological design, and emphasize how the system can be integrated with emerging developments such as mixed reality environments. We conclude by considering future developments and applications of the integrated projection technology for research in human movement behaviors.

  8. A Novel Evaluation Method for Building Construction Project Based on Integrated Information Entropy with Reliability Theory

    Directory of Open Access Journals (Sweden)

    Xiao-ping Bai

    2013-01-01

    Full Text Available Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  9. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    Energy Technology Data Exchange (ETDEWEB)

    Sajadi, Amirhossein [Case Western Reserve Univ., Cleveland, OH (United States); Loparo, Kenneth A. [Case Western Reserve Univ., Cleveland, OH (United States); D' Aquila, Robert [General Electric (GE), Albany, NY (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Waligorski, Joseph G. [FirstEnergy, Akron, OH (United States); Baker, Scott [PJM Interconnection, Audubon, PA (United States)

    2016-06-30

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

  10. A novel evaluation method for building construction project based on integrated information entropy with reliability theory.

    Science.gov (United States)

    Bai, Xiao-ping; Zhang, Xi-wei

    2013-01-01

    Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  11. Shippingport Atomic Power Station. Quarterly operating report, third quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    Jones, T. D.

    1978-01-01

    A loss of ac power to the station occurred on July 28, 1978 caused by an interaction between Beaver Valley Power Station and Shippingport Atomic Power Station when the main transformer of Unit No. 1 of the Beaver Valley Power Station developed an internal failure and tripped the BVPS. Two environmental studies were continued this quarter. The first involves reduction of main unit condenser chlorination and the second, river intake screen fish impingement sampling. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. During the third quarter of 1978, 874 cubic feet of radioactive solid waste was shipped out of state for burial. At the end of the quarter, the Fall shutdown continued with the plant heated up, the main turbine on turning gear and plant testing in progress prior to Station startup.

  12. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  13. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    Science.gov (United States)

    Draper, Alison J.

    2004-02-01

    In an advanced environmental chemistry course, the inclusion of semester-long scientific service projects successfully integrated the research process with course content. Each project involved a unique community-based environmental analysis in which students assessed an aspect of environmental health. The projects were due in small pieces at even intervals, and students worked independently or in pairs. Initially, students wrote a project proposal in which they chose and justified a project. Following a literature review of their topic, they drafted sampling and analysis plans using methods in the literature. Samples were collected and analyzed, and all students assembled scientific posters describing the results of their study. In the last week of the semester, the class traveled to a regional professional meeting to present the posters. In all, students found the experience valuable. They learned to be professional environmental chemists and learned the value of the discipline to community health. Students not only learned about their own project in depth, but they were inspired to learn textbook material, not for an exam, but because it helped them understand their own project. Finally, having a community to answer to at the end of the project motivated students to do careful work.

  14. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  15. NST Quarterly. July 1996 issue

    International Nuclear Information System (INIS)

    1996-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in in-vitro mutagenesis of ornamental plants, soil erosion studies and animal feed production from agricultural waste

  16. NST Quarterly - January 1998 issue

    International Nuclear Information System (INIS)

    1998-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in proposal of national networking for biotechnology culture collection centre (NNBCCC)

  17. NST Quarterly. October 1996 issue

    International Nuclear Information System (INIS)

    1996-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in latex vulcanization (first RVNRL-based rubber gloves produced in Malaysia), tank floor scanning system (TAFLOSS), incineration and radiotherapeutic agent

  18. NST Quarterly - issue January 2002

    International Nuclear Information System (INIS)

    2002-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. The subjects discussed are i. food and drinking water which are the major pathways of radionuclides to man and ii. nuclear techniques help to monitor sedimentation in reservoir

  19. NST Quarterly - April 1998 issue

    International Nuclear Information System (INIS)

    1998-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in ionizing radiation as an alternative method for sanitization of herbs and spices

  20. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  1. Transport Corridors in the Russian Integration Projects, the Case of the Eurasian Economic Union

    Directory of Open Access Journals (Sweden)

    Olga A. Podberezkina

    2015-01-01

    Full Text Available The article discusses the political importance of transport corridors in terms of the development of integration projects in the post-Soviet space. The world is witnessing the formation of a single market and transport and communication infrastructure, which intensifies competition among regional and world leaders, both states and non-state actors, such as businesses, markets over the routes of transporting goods. In the medium and long term the value of the control over the transport routes will increase due to the dynamics of economic development in the Asia-Pacific region. Competition for the development of projects of international transport corridors (ITC between the leading countries in the region will increase, because the ITC entail the formation of a common political space, the reduction of tariff and customs barriers, which provides easy access to the markets of countries linked by ITCs and creates the preconditions for economic integration. The growing political importance of ITC is reflected in the fact that global leaders such as China, the US, the EU, are trying to create their own versions of international land transport corridors connecting Europe and Asia. China is trying to promote their transport project "Economic Belt Silk Road" European countries develop cooperation on ITC TRACECA with other countries of Eurasia. US also embody their interests through the implementation of the project by the ITC in Afghanistan. Transport corridors in Russia are seen as a way to integrate it into the global transportation system and logistics space. To do this, Russia needs to develop Eurasian transport corridors through its territory. As a result of the implementation of transport projects Russia will be able to ensure the transit of goods from China to Europe, which has a positive impact on the economic development of the regions through which they pass. Development of international transportation through Russia will unite many of the

  2. Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.

    Science.gov (United States)

    Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob

    2016-05-01

    The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."

  3. 34 CFR 425.1 - What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program? 425.1 Section 425.1 Education Regulations of the Offices... EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING PROGRAM General...

  4. Curriculum Integration in Distance Learning at Primary and Secondary Educational Levels on the Example of eTwinning Projects

    Science.gov (United States)

    Gajek, Elzbieta

    2018-01-01

    Curriculum integration is one of the concepts which has been discussed for years. Telecollaborative projects, which employ elements of distance learning, provide opportunities for putting the idea into practice. Analysis of eTwinning projects undertaken in Polish schools aims at demonstrating the integrative role of distance learning approaches…

  5. Integrating Creativity Training into Problem and Project-Based Learning (PBL) Curriculum in Engineering Education

    DEFF Research Database (Denmark)

    Zhou, Chunfang

    2012-01-01

    In order to foster creative engineers, a creativity training programme was carried out in medialogy education in a Problem and Project-Based Learning (PBL) environment at Aalborg University, Denmark. This paper focuses on the question of how engineering students perceive the strategy of integrating...... creativity training into a PBL curriculum. A total of 20 medialogy students in the training programme were interviewed. The data shows that the training programme was thought useful and students get benefits such as gaining project work skills, creative concepts and confidence of being creative. However...

  6. MATHEMATICAL MODEL DESIGNATED FOR THE ASSESSMENT OF THE INTEGRATED ENVIRONMENTAL LOAD PRODUCED BY A BUILDING PROJECT

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2012-10-01

    The theoretical background of the proposed approach consists in an integrated methodology implemented in the system engineering of construction projects. A building system may be represented as the aggregate of all stages of construction works and participants involved in them. The building system is object-oriented, and it is implemented under the impact of pre-determined environmental factors. The core constituent of the building system represents a Production Technology Module (PTM, or summarized groups of processes. The model formula designated for the assessment of the intensity of the ecological load produced by the construction project onto the environment may be represented as follows:

  7. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  8. Fiscal Year 2005 Integrated Monitoring Plan for the Hanford Groundwater Performance Assessment Project

    International Nuclear Information System (INIS)

    Rieger, JoAnne T.; Hartman, Mary J.

    2005-01-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various purposes, but sampling is coordinated and data are shared among users. DOE manages these activities through the Hanford Groundwater Performance Assessment Project, which is the responsibility of Pacific Northwest National Laboratory. The groundwater project integrates monitoring for various objectives into a single sampling schedule to avoid redundancy of effort and to improve efficiency of sample collection.This report documents the purposes and objectives of groundwater monitoring at the DOE Hanford Site in southeastern Washington State

  9. Fifth Single-Shell Tank Integrity Project Expert Panel Meeting August 28-29, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Todd M. [Washington River Protection Solutions, LLC, Richland, WA (United States; Gunter, Jason R. [Washington River Protection Solutions, LLC, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, LLC, Richland, WA (United States)

    2015-01-07

    On August 28th and 29th, 2014 the Single-Shell Tank Integrity Project (SSTIP) Expert Panel (Panel) convened in Richland, Washington. This was the Panel’s first meeting since 2011 and, as a result, was focused primarily on updating the Panel on progress in response to the past recommendations (Single-Shell Tank Integrity Expert Panel Report, RPP-RPT-45921, Rev 0, May 2010). This letter documents the Panel’s discussions and feedback on Phase I activities and results.

  10. Integrating model of the Project Independence Evaluation System. Volume VI. Data documentation. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Allen, B J

    1979-02-01

    This documentation describes the PIES Integrating Model as it existed on January 1, 1978. This volume contains two chapters. In Chapter I, Overview, the following subjects are briefly described: supply data, EIA projection series and scenarios, demand data and assumptions, and supply assumptions - oil and gas availabilities. Chapter II contains supply and demand data tables and sources used by the PIES Integrating Model for the mid-range scenario target years 1985 and 1990. Tabulated information is presented for demand, price, and elasticity data; coal data; imports data; oil and gas data; refineries data; synthetics, shale, and solar/geothermal data; transportation data; and utilities data.

  11. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  12. Integrating Field-Centered, Project Based Activities with Academic Year Coursework: A Curriculum Wide Approach

    Science.gov (United States)

    Kelso, P. R.; Brown, L. M.

    2015-12-01

    Based upon constructivist principles and the recognition that many students are motivated by hands-on activities and field experiences, we designed a new undergraduate curriculum at Lake Superior State University. One of our major goals was to develop stand-alone field projects in most of the academic year courses. Examples of courses impacted include structural geology, geophysics, and geotectonics, Students learn geophysical concepts in the context of near surface field-based geophysical studies while students in structural geology learn about structural processes through outcrop study of fractures, folds and faults. In geotectonics students learn about collisional and rifting processes through on-site field studies of specific geologic provinces. Another goal was to integrate data and samples collected by students in our sophomore level introductory field course along with stand-alone field projects in our clastic systems and sequence stratigraphy courses. Our emphasis on active learning helps students develop a meaningful geoscience knowledge base and complex reasoning skills in authentic contexts. We simulate the activities of practicing geoscientists by engaging students in all aspects of a project, for example: field-oriented project planning and design; acquiring, analyzing, and interpreting data; incorporating supplemental material and background data; and preparing oral and written project reports. We find through anecdotal evidence including student comments and personal observation that the projects stimulate interest, provide motivation for learning new concepts, integrate skill and concept acquisition vertically through the curriculum, apply concepts from multiple geoscience subdisiplines, and develop soft skills such as team work, problem solving, critical thinking and communication skills. Through this projected-centered Lake Superior State University geology curriculum students practice our motto of "learn geology by doing geology."

  13. The SUSTAIN Project: A European Study on Improving Integrated Care for Older People Living at Home

    Science.gov (United States)

    Stoop, Annerieke; Billings, Jenny; Leichsenring, Kai; Ruppe, Georg; Tram, Nhu; Barbaglia, María Gabriela; Ambugo, Eliva A.; Zonneveld, Nick; Paat-Ahi, Gerli; Hoffmann, Henrik; Khan, Usman; Stein, Viktoria; Wistow, Gerald; Lette, Manon; Jansen, Aaltje P.D.; Nijpels, Giel; Baan, Caroline A.

    2018-01-01

    Introduction: Integrated care programmes are increasingly being put in place to provide care to older people who live at home. Knowledge of how to further develop integrated care and how to transfer successful initiatives to other contexts is still limited. Therefore, a cross-European research project, called Sustainable Tailored Integrated Care for Older People in Europe (SUSTAIN), has been initiated with a twofold objective: 1. to collaborate with local stakeholders to support and monitor improvements to established integrated care initiatives for older people with multiple health and social care needs. Improvements focus on person-centredness, prevention orientation, safety and efficiency; 2. to make these improvements applicable and adaptable to other health and social care systems, and regions in Europe. This paper presents the overall structure and approach of the SUSTAIN project. Methods: SUSTAIN uses a multiple embedded case study design. In three phases, SUSTAIN partners: (i) conduct interviews and workshops with stakeholders from fourteen established integrated care initiatives to understand where they would prefer improvements to existing ways of working; (ii) collaborate with local stakeholders to support the design and implementation of improvement plans, evaluate implementation progress and outcomes per initiative, and carry out overarching analyses to compare the different initiatives, and; (iii) translate knowledge and experience to an online roadmap. Discussion: SUSTAIN aims to generate evidence on how to improve integrated care, and apply and transfer the knowledge gained to other health and social care systems, and regions. Lessons learned will be brought together in practical tools to inform and support policy-makers and decision-makers, as well as other stakeholders involved in integrated care, to manage and improve care for older people living at home. PMID:29632456

  14. THE BODY IN MUSIC, THE MUSIC IN BODY: A COMMUNITY INTEGRATION PROJECT

    Directory of Open Access Journals (Sweden)

    Fábio Pra da Silva de Souza

    2009-07-01

    Full Text Available This article is the result of the Artistic and Culture Department extension project “The Body in Music, The Music in Body: a community integration project” that took music to community on Universidade Federal de Santa Catarina (UFSC in two different ways: buy choir singing group and the music therapy activities on Parkinson Disease Patients Group. The objectives of this project were to integrate choir singing to dance, develop music perception and body expression. Broadcast choir singing, improve facial expression and body movements. To reach these objectives were done body expression workshops, music and vocal technique rehearsals, rhythm exercises and some auditions among UFSC an other public places in Florianópolis.

  15. Idea: an integrated set of tools for sustainable nuclear decommissioning projects

    International Nuclear Information System (INIS)

    Detilleux, M.; Centner, B.; Vanderperre, S.; Wacquier, W.

    2008-01-01

    Decommissioning of nuclear installations constitutes an important challenge and shall prove to the public that the whole nuclear life cycle is fully mastered by the nuclear industry. This could lead to an easier public acceptance of the construction of new nuclear power plants. When ceasing operation, nuclear installations owners and operators are looking for solutions in order to assess and keep decommissioning costs at a reasonable level, to fully characterise waste streams (in particular radiological inventories of difficult-to-measure radionuclides) and to reduce personnel exposure during the decommissioning activities taking into account several project, site and country specific constraints. In response to this need, Tractebel Engineering has developed IDEA (Integrated DEcommissioning Application), an integrated set of computer tools, to support the engineering activities to be carried out in the frame of a decommissioning project. IDEA provides optimized solutions from an economical, environmental, social and safety perspective. (authors)

  16. OVERVIEW OF ENHANCED HANFORD SINGLE-SHELL TANK (SST) INTEGRITY PROJECT - 12128

    Energy Technology Data Exchange (ETDEWEB)

    VENETZ TJ; BOOMER KD; WASHENFELDER DJ; JOHNSON JB

    2012-01-25

    To improve the understanding of the single-shell tanks integrity, Washington River Protection Solutions, LLC, the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank (SST) Integrity Project in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase has been focused on efforts to envelope the integrity of the tanks. The initial phase was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary based on the outcome from the initial work, a second phase would be focused on further definition of the integrity of the concrete and liners. Combined these two phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by Independent Qualified Registered Engineer. The work to further define the DOE's understanding of the structural integrity SSTs involves preparing a modern Analysis of Record using a finite element analysis program. Structural analyses of the SSTs have been conducted since 1957, but these analyses used analog calculation, less rigorous models, or focused on individual structures. As such, an integrated understanding of all of the SSTs has not been developed to modern expectations. In support of this effort, other milestones will address the visual inspection of the tank concrete and the collection of concrete core samples from the tanks for analysis

  17. Overview Of Enhanced Hanford Single-Shell Tank (SST) Integrity Project - 12128

    International Nuclear Information System (INIS)

    Venetz, T.J.; Boomer, K.D.; Washenfelder, D.J.; Johnson, J.B.

    2012-01-01

    To improve the understanding of the single-shell tanks integrity, Washington River Protection Solutions, LLC, the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank (SST) Integrity Project in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase has been focused on efforts to envelope the integrity of the tanks. The initial phase was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary based on the outcome from the initial work, a second phase would be focused on further definition of the integrity of the concrete and liners. Combined these two phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by Independent Qualified Registered Engineer. The work to further define the DOE's understanding of the structural integrity SSTs involves preparing a modern Analysis of Record using a finite element analysis program. Structural analyses of the SSTs have been conducted since 1957, but these analyses used analog calculation, less rigorous models, or focused on individual structures. As such, an integrated understanding of all of the SSTs has not been developed to modern expectations. In support of this effort, other milestones will address the visual inspection of the tank concrete and the collection of concrete core samples from the tanks for analysis of

  18. Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

    Science.gov (United States)

    Valkov, Steffi B.; Sternberg, Daniel; Marston, Michael

    2018-01-01

    The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries.

  19. Power Systems Development Facility. Quarterly report, July 1--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This quarterly technical progress report summarizes the work completed during the third quarter of a project entitled Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion. The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phase expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  20. Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, R.R.

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.

  1. The SeaView EarthCube project: Lessons Learned from Integrating Across Repositories

    Science.gov (United States)

    Diggs, S. C.; Stocks, K. I.; Arko, R. A.; Kinkade, D.; Shepherd, A.; Olson, C. J.; Pham, A.

    2017-12-01

    SeaView is an NSF-funded EarthCube Integrative Activity Project working with 5 existing data repositories* to provide oceanographers with highly integrated thematic data collections in user-requested formats. The project has three complementary goals: Supporting Scientists: SeaView targets scientists' need for easy access to data of interest that are ready to import into their preferred tool. Strengthening Repositories: By integrating data from multiple repositories for science use, SeaView is helping the ocean data repositories align their data and processes and make ocean data more accessible and easily integrated. Informing EarthCube (earthcube.org): SeaView's experience as an integration demonstration can inform the larger NSF EarthCube architecture and design effort. The challenges faced in this small-scale effort are informative to geosciences cyberinfrastructure more generally. Here we focus on the lessons learned that may inform other data facilities and integrative architecture projects. (The SeaView data collections will be presented at the Ocean Sciences 2018 meeting.) One example is the importance of shared semantics, with persistent identifiers, for key integration elements across the data sets (e.g. cruise, parameter, and project/program.) These must allow for revision through time and should have an agreed authority or process for resolving conflicts: aligning identifiers and correcting errors were time consuming and often required both deep domain knowledge and "back end" knowledge of the data facilities. Another example is the need for robust provenance, and tools that support automated or semi-automated data transform pipelines that capture provenance. Multiple copies and versions of data are now flowing into repositories, and onward to long-term archives such as NOAA NCEI and umbrella portals such as DataONE. Exact copies can be identified with hashes (for those that have the skills), but it can be painfully difficult to understand the processing

  2. The Avignon Bridge: a 3d Reconstruction Project Integrating Archaeological, Historical and Gemorphological Issues

    Science.gov (United States)

    Berthelot, M.; Nony, N.; Gugi, L.; Bishop, A.; De Luca, L.

    2015-02-01

    The history and identity of the Avignon's bridge is inseparable from that of the Rhône river. Therefore, in order to share the history and memory of the Rhône, it is essential to get to know this bridge and especially to identify and make visible the traces of its past, its construction, its interaction with the river dynamics, which greatly influenced his life. These are the objectives of the PAVAGE project that focuses on digitally surveying, modelling and re-visiting a heritage site of primary importance with the aim of virtually restoring the link between the two sides which, after the disappearance of the Roman bridge of Arles, constituted for a long time the only connection between Lyon or Vienna and the sea. Therefore, this project has an important geo-historical dimension for which geo-morphological and paleoenvironmental studies were implemented in connection with the latest digital simulation methods exploiting geographic information systems. By integrating knowledge and reflections of archaeologists, historians, geomorphologists, environmentalists, architects, engineers and computer scientists, the result of this project (which involved 5 laboratories during 4 years) is a 3D digital model covering an extension of 50 km2 achieved by integrating satellite imagery, UAV-based acquisitions, terrestrial laser scanning and photogrammetry, etc. Beyond the actions of scientific valorisation concerning the historical and geomorphological dimensions of the project, the results of this work of this interdisciplinary investigation and interpretation of this site are today integrated within a location-based augmented reality application allowing tourists to exploring the virtual reconstruction of the bridge and its environment through tablets inside the portion of territory covered by this project (between Avignon and Villeneuve-lez-Avignon). This paper presents the main aspects of the 3D virtual reconstruction approach.

  3. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  4. Quarterly coal report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

  5. Integrated project 'fundamental processes of radionuclide migration (FUNMIG)', within EC 6. framework programme

    International Nuclear Information System (INIS)

    Buckau, G.

    2005-01-01

    Full text of publication follows: The FUNMIG project is an integrated project within the 6. Framework Programme of the European Commissions. It started 1 January 2005 and has a duration of 4 years. The project deals with all aspects of radionuclide migration in the far-field of a high level nuclear waste repository. It is structured into seven components. Two components are on fundamental processes applicable to all nuclear waste disposal concepts and host-rock types. They are divided into processes that are conceptually well understood and one component dealing with processes where not only trustworthy data are scarce, but conceptualization is at an infant state. Three components address processes specific for host rock types presently under discussion for high level waste disposal in the EU, namely clay rich, crystalline and salt rock. One component is on integration of processes and abstraction to performance assessment. Finally, one component deals with a broad spectrum of activities on knowledge transfer and training. There are 51 contractors from 15 European countries involved. In addition, a special instrument is used for groups interested in participation as Associated Groups. There are presently about 15 such Associated Groups increasing the number of countries involved to 17. Among these Associated Groups, presently 8 national regulatory bodies are represented, promoting communication between the scientific-technical and regulatory communities. There is no specific deadline for joining the FUNMIG project as an Associated Group and negotiations with further groups/organizations is ongoing. Information about the FUNMIG project can be found under www.funmig.com. The present project is one out of four dealing with disposal of radioactive waste within the European Commissions 6. Framework Programme. The other ones are on the basis for waste disposal techniques, near field processes, and a project expected within the next future dealing with performance

  6. Integrated Mid-Continent Carbon Capture, Sequestration & Enhanced Oil Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Brian McPherson

    2010-08-31

    A consortium of research partners led by the Southwest Regional Partnership on Carbon Sequestration and industry partners, including CAP CO2 LLC, Blue Source LLC, Coffeyville Resources, Nitrogen Fertilizers LLC, Ash Grove Cement Company, Kansas Ethanol LLC, Headwaters Clean Carbon Services, Black & Veatch, and Schlumberger Carbon Services, conducted a feasibility study of a large-scale CCS commercialization project that included large-scale CO{sub 2} sources. The overall objective of this project, entitled the 'Integrated Mid-Continent Carbon Capture, Sequestration and Enhanced Oil Recovery Project' was to design an integrated system of US mid-continent industrial CO{sub 2} sources with CO{sub 2} capture, and geologic sequestration in deep saline formations and in oil field reservoirs with concomitant EOR. Findings of this project suggest that deep saline sequestration in the mid-continent region is not feasible without major financial incentives, such as tax credits or otherwise, that do not exist at this time. However, results of the analysis suggest that enhanced oil recovery with carbon sequestration is indeed feasible and practical for specific types of geologic settings in the Midwestern U.S.

  7. Coal demonstration plants. Quarterly report, July--September 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-02-01

    The objective of DOE's demonstration plant program is to establish the technical and financial feasibility of coal conversion technologies proven during pilot plant testing. Demonstration plants will minimize the technical and economic risks of commercialization by providing a near commercial size plant for testing and production. Thus, DOE is sponsoring the development of a series of demonstration plants, each of which will be a smaller version of commercial plants envisioned for the 1980's. These plants will be wholly integrated, self-sufficient in terms of heat generation, and dependent only on feedstock of coal, water, and air. Contracts for designing, constructing, and operating the demonstration plants will be awarded through competitive procedures and will be jointly funded. The conceptual design phase will be funded by the government, with the detailed design, procurement, construction, and operation phases being co-funded, 50% from industry and 50% from the government. The cost involved in building and operating a demonstration plant will probably be between $200 million and $500 million, depending on the size of the plant. Twenty-two projects involving demonstration plants or support projects for such plants are reviewed, including a summary for each of progress in the quarter. (LTN)

  8. Coal demonstration plants. Quarterly report, April--June 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    The objective of DOE's demonstration plant program is to establish the technical and financial feasibility of coal conversion technologies proven during pilot plant testing. Demonstration plants will minimize the technical and economic risks of commercialization by providing a near commercial size plant for testing and production. Thus, DOE is sponsoring the development of a series of demonstration plants, each of which will be a smaller version of commercial plants envisioned for the 1980's. These plants will be wholly integrated, self-sufficient in terms of heat generation, and dependent only on feedstock of coal, water, and air. Under the DOE program, contracts for designing, constructing, and operating the demonstration plants will be awarded through competitive procedures and will be jointly funded. The conceptual design phase will be funded by the government, with the detailed design, procurement, construction, and operation phases being co-funded, 50% from industry and 50% from the government. The cost involved in building and operating a demonstration plant will probably be between $200 million and $500 million, depending on the size of the plant. Six of these demonstration plant projects are described and progress in the quarter is summarized. Several support and complementary projects are described (fuel feeding system development, performance testing and comparative evaluation, engineering support, coal grinding equipment development and a critical components test facility). (LTN)

  9. Evolution of Project Management in Integration Development Trends of Today’s Russia

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa

    2017-01-01

    Full Text Available Today’s development trends are affected by many external and internal factors, stepping up globalization processes, faster innovation cycles, negative effects of various bans, import and export sanctions slapped on some categories of goods, technologies, capital, etc. Tit-for-tat responses of the economic systems seek sustainable development of countries taking part in the integration processes. A radical-yet-constructive strategy that deepens integration can tackle the problem. Its focus is determined by the need to upgrade the economies of the former Soviet Union; while a mutual interest in the rollout of the synergistic integration potential channels common efforts on transcontinental megaprojects. A new type of integration projects creates comprehensive methods of project management. They feature the need for information transparency and controlled alignment of innovation, investment, construction and resource capacities of member countries. With streamlined resource flows, the Eurasian transit will help facilitate and cut costs of commodity exchange among countries, provided they take synchronized efforts in not just technical and technological, but also organizational, economic, legal and IT innovations.

  10. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    International Nuclear Information System (INIS)

    Joyner, William Scott; Knight, Mark A.

    2013-01-01

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information

  11. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    Energy Technology Data Exchange (ETDEWEB)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  12. Urban Planning Aspects of Museum Quarters as an Architectural Medium for Creative Cities

    Science.gov (United States)

    Kochergina, Ekaterina

    2017-10-01

    Since the second half of the 20th century, urban environment has experienced significant transformation. Splash of interactivity, bottom-up initiations with development of creative sector of city economy and participatory planning, irretrievably changed the attitude to the urban medium. One of the most intensively growing field - creative industry - provided cities with numerous cultural clusters, which boosted urban economic development and social cohesion. Supported in many cases by gentrification and revitalization, these processes brought renovation of brownfield and more comprehensive approaches to urban design. Understanding of the economic benefits made city managers start an active promotion of creative clusters and their intensive integration into urban life, involving the main museums and cultural institutions. Thus, a new type of cultural clusters - Museum Quarter - appeared. Holding the position of cultural flagman in the historical heart of the city, Museum Quarters (MQs) pretend to take on an important role both in urban planning structure and in social life. Furthermore, such role usually has strong influence on the surrounding districts, in a positive or negative way. Although basic principles are still applied for all types of cultural districts, the phenomena of “Museum Quarters” due to the complexity of planning, operating and maintenance issues, stepped far above basic cultural clusters, requiring substantially new attitude to the planning of such urban entities. Five clusters were chosen for this study: MQs in Vienna, Berlin, Amsterdam, Copenhagen and the currently developing project in Budapest. The main purpose of this paper is to elaborate the principles for the practical implementation of Museum Quarters by the definition and classification of their specific urban planning aspects. The complexity of target object - Museum Quarter - and its multi-level relationships with the whole city, require from the research interdisciplinary

  13. Shale oil value enhancement research. Quarterly report, March 1 - May 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Activities during this quarter focused on integrating the various tasks and elements. During Phase-1, substantial effort was placed on designing and automating the identification of molecular types present in shale oil. The ability to know the molecular composition and to track a given ``target`` species through the initial concentration steps was deemed critically important to the ultimate success of the three-phase project. It has been this molecular tracking ability that clearly distinguishes the JWBA work from prior shale oil research. The major software and hardware tasks are not in place to rapidly perform these analytical efforts. Software improvements are expected as new questions arise. The existence of the major nitrogen and oxygen types in shale oil has been confirmed. Most importantly, the ability to convert higher molecular weight types to lower molecular weight types was preliminarily confirmed in the present quarter. This is significant because it confirms earlier hypothesis that values are found though out the boiling range. Potential yields of extremely high value chemicals, e.g., $1000/bbl of up to 10% by weight of the barrel remain a feasible objective. Market and economic assessment continue to show encouraging results. Markets for specialty and fine chemicals containing a nitrogen atom are expanding both in type and application. Initial discussions with pharmaceutical and agrochemical industries show a strong interest in nitrogen-based compounds. Major progress was made during this quarter in completing agreements with industry for testing of shale oil components for biological activity. Positive results of such testing will add to the previously known applications of shale oil components as pure compounds and concentrates. During this quarter, we will formulate the pilot plant strategy for Phase-11(a).

  14. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address

  15. Systematic assessment of wellbore integrity for geologic carbon storage projects using regulatory and industry information

    Energy Technology Data Exchange (ETDEWEB)

    Moody, Mark [Battelle Memorial Institute, Columbus, OH (United States); Sminchak, J.R. [Battelle Memorial Institute, Columbus, OH (United States)

    2015-11-01

    Under this three year project, the condition of legacy oil and gas wells in the Midwest United States was evaluated through analysis of well records, well plugging information, CBL evaluation, sustained casing pressure (SCP) field testing, and analysis of hypothetical CO2 test areas to provide a realistic description of wellbore integrity factors. The research included a state-wide review of oil and gas well records for Ohio and Michigan, along with more detailed testing of wells in Ohio. Results concluded that oil and gas wells are clustered along fields in areas. Well records vary in quality, and there may be wells that have not been identified in records, but there are options for surveying unknown wells. Many of the deep saline formations being considered for CO2 storage have few wells that penetrate the storage zone or confining layers. Research suggests that a variety of well construction and plugging approaches have been used over time in the region. The project concluded that wellbore integrity is an important issue for CO2 storage applications in the Midwest United States. Realistic CO2 storage projects may cover an area in the subsurface with several hundred legacy oil and gas wells. However, closer inspection may often establish that most of the wells do not penetrate the confining layers or storage zone. Therefore, addressing well integrity may be manageable. Field monitoring of SCP also indicated that tested wells provided zonal isolation of the reservoirs they were designed to isolate. Most of these wells appeared to exhibit gas pressure originating from intermediate zones. Based on these results, more flexibility in terms of cementing wells to surface, allowing well testing, and monitoring wells may aid operators in completing CO2 storage project. Several useful products were developed under this project for examining wellbore integrity for CO2 storage applications including, a

  16. Hot Gas Cleanup Test Facility for gasification and pressurized combustion. Quarterly report, October--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs. Substantial progress in underground construction activities was achieved during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. MWK equipment at the grade level and the first tier are being set in the structure.

  17. 77 FR 43344 - Notice of ACHP Quarterly Business Meeting

    Science.gov (United States)

    2012-07-24

    ... ADVISORY COUNCIL ON HISTORIC PRESERVATION Notice of ACHP Quarterly Business Meeting AGENCY: Advisory Council on Historic Preservation. ACTION: Notice. SUMMARY: Notice is hereby given that the... Program Comment on Bridges D. Executive Order on Infrastructure Projects VII. New Business VIII. Adjourn...

  18. Integration of academic learning and service development through guided projects for rural practitioners in India.

    Science.gov (United States)

    Vyas, Rashmi; Zachariah, Anand; Swamidasan, Isobel; Doris, Priya; Harris, Ilene

    2011-01-01

    Christian Medical College Vellore (CMC) aspired through its Fellowship in Secondary Hospital Medicine (FSHM), a 1-year distance-learning program, to integrate academic learning and service development through guided projects for junior doctors working in small rural hospitals. The purpose of this article is to report the evaluation of the effectiveness of the project work in the FSHM program. Mixed method evaluation was done using focus group discussion with students, written surveys for students and faculty, and telephone interviews with students and medical superintendents. Evidence for validity was gathered for the written survey. Criteria for trustworthiness were applied for the qualitative data analysis. The major strengths of the project work identified were that students became aware of local health problems and how to deal with them, learned to work as a team, and had a sense of doing something useful. Recommendations for improvement were to have more interactions between guides and students. The benefits of projects to the hospital were providing improved clinical care, improved health systems, cost effective care management and benefits to the community. Service learning through guided project work should be incorporated into distance-learning educational programs for junior doctors working in rural hospitals.

  19. Integrated evaluation framework. Based on the logical framework approach for project cycle management

    International Nuclear Information System (INIS)

    1996-11-01

    This Integrated Evaluation Framework (IEF) was developed by TC Evaluation with the aim of presenting in a comprehensive manner the logic of thinking used when evaluating projects and programmes. Thus, in the first place, the intended audience for this report are evaluation officers, so that when applying the evaluation procedures and check lists, data can be organized following a systematic and logical scheme and conclusions can be derived ''objectively''. The value of such a framework for reporting on performance and in providing a quality reference for disbursements represents one of its major advantages. However, when developing and applying the IEF, it was realized that a Logical Framework Approach (LFA), like the one upon which the IEF is based, needs to be followed throughout the project life cycle, from the Country Programme Framework planning stage, through project design and implementation. Then, the helpful consequences flow into project design quality and smooth implementation. It is only in such an environment that meaningful and consistent evaluation can take place. Therefore the main audience for this report are Agency staff involved in planning, designing and implementing TC projects as well as their counterparts in Member States. In this understanding, the IEF was subjected to review by a consultants meeting, which included both external consultants and Agency staff. This Consultants Review Meeting encouraged the Secretariat to further adopt the LFA into the TC management process

  20. Results from the European Integrated Project '' New Materials for Extreme Environments (ExtreMat) ''

    International Nuclear Information System (INIS)

    Bolt, H.; Linsmeier, Ch.; Baluc, N.; Garcia-Rosales, G.; Gualco, G. C.; Simancik, F.

    2006-01-01

    The goal of the European Integrated Project '' ExtreMat '' is to provide and to industrialize new materials and their compounds for applications in extreme environments that are beyond reach with incremental materials development only. The R(and)D activities in this project aim to provide a) self-passivating protection materials for sensitive structures operated in physico-chemically aggressive environments at high temperatures; b) new heat sink materials with the capability of very efficient heat removal, often at very high temperature level; c) radiation resistant materials for very high operation temperatures; d) new processing routes for complex heterogeneous compounds that can be operated in extreme environments. Key applications for these new materials are in the sectors of fusion, advanced fission, space, and electronic applications. Further use of these materials is expected in spin-off fields, such as brake applications and energy conversion. The project started in December 2004 for a duration of five years and is supported by the European Community. The 37 project participants are from 13 EU member states and include 6 universities, 7 research institutes, 10 research centres and 14 industrial companies. Research results regarding the development of materials for application in nuclear fusion, especially on protection, heat sink, and radiation resistant materials will be presented. A view to other applications of these materials in the fields of fission, space and electronics will be given in the presentation. ExtreMat Project Partners: see http://www.extremat.org/. (author)

  1. Integrated management tool for controls software problems, requests and project tasking at SLAC

    International Nuclear Information System (INIS)

    Rogind, D.; Allen, W.; Colocho, W.; DeContreras, G.; Gordon, J.; Pandey, P.; Shoaee, H.

    2012-01-01

    The Accelerator Directorate (AD) Instrumentation and Controls (ICD) Software (SW) Department at SLAC, with its service center model, continuously receives engineering requests to design, build and support controls for accelerator systems lab-wide. Each customer request can vary in complexity from a small software engineering change to a major enhancement. SLAC's Accelerator Improvement Projects (AIPs), along with DOE Construction projects, also contribute heavily to the work load. The various customer requests and projects, paired with the ongoing operational maintenance and problem reports, place a demand on the department that consistently exceeds the capacity of available resources. A centralized repository - comprised of all requests, project tasks, and problems - available to physicists, operators, managers, and engineers alike, is essential to capture, communicate, prioritize, assign, schedule, track, and finally, commission all work components. The Software Department has recently integrated request / project tasking into SLAC's custom online problem tracking 'Comprehensive Accelerator Tool for Enhancing Reliability' (CATER) tool. This paper discusses the newly implemented software request management tool - the workload it helps to track, its structure, features, reports, work-flow and its many usages. (authors)

  2. Application of Model Project Based Learning on Integrated Science in Water Pollution

    Science.gov (United States)

    Yamin, Y.; Permanasari, A.; Redjeki, S.; Sopandi, W.

    2017-09-01

    The function of this research was to analyze the influence model Project Based Learning (PjBl) on integrated science about the concept mastery for junior high school students. Method used for this research constitutes the quasi of experiment method. Population and sample for this research are the students junior high school in Bandung as many as two classes to be experiment and control class. The instrument that used for this research is the test concept mastery, assessment questionnaire of product and the questionnaire responses of the student about learning integrated science. Based on the result of this research get some data that with accomplishment the model of PjBl. Learning authority of integrated science can increase the concept mastery for junior high school students. The highest increase in the theme of pollution water is in the concept of mixtures and the separation method. The students give a positive response in learning of integrated science for the theme of pollution of the water used model PjBL with questionnaire of the opinion aspect in amount of 83.5%, the anxiety of the students in amount of 95.5%, the profit learning model of PjBL in amount of 96.25% and profit learning of integrated science in amount of 95.75%.

  3. Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

    Science.gov (United States)

    Sauerwein, Timothy A.; Gostomski, Tom

    2007-01-01

    The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all

  4. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    Science.gov (United States)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  5. Second quarterly report 1976

    International Nuclear Information System (INIS)

    1976-11-01

    The report describes activities carried out in the framework of the Fast Breeder Project at Karlsruhe Nuclear Research Centre or on its behalf. There are contributions to the following issues: fuel rod development, materials analysis and development, corrosion tests and coolant analyses, physical experiments, reactor theory, the safety of fast reactors, instrumentation and signal processing for core monitoring, environmental effects, sodium technology experiments, thermo- and fluid-dynamic studies in gases, studies on the layout of gas-cooled breeder reactors, studies on the layout of sodium-cooled breeder reactors. (HR) [de

  6. Prediction of irradiation damage effects by multi-scale modelling: EURATOM 3 Framework integrated project perfect

    International Nuclear Information System (INIS)

    Massoud, J.P.; Bugat, St.; Marini, B.; Lidbury, D.; Van Dyck, St.; Debarberis, L.

    2008-01-01

    Full text of publication follows. In nuclear PWRs, materials undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities operating these reactors must quantify the aging and the potential degradations of reactor pressure vessels and also of internal structures to ensure safe and reliable plant operation. The EURATOM 6. Framework Integrated Project PERFECT (Prediction of Irradiation Damage Effects in Reactor Components) addresses irradiation damage in RPV materials and components by multi-scale modelling. This state-of-the-art approach offers potential advantages over the conventional empirical methods used in current practice of nuclear plant lifetime management. Launched in January 2004, this 48-month project is focusing on two main components of nuclear power plants which are subject to irradiation damage: the ferritic steel reactor pressure vessel and the austenitic steel internals. This project is also an opportunity to integrate the fragmented research and experience that currently exists within Europe in the field of numerical simulation of radiation damage and creates the links with international organisations involved in similar projects throughout the world. Continuous progress in the physical understanding of the phenomena involved in irradiation damage and continuous progress in computer sciences make possible the development of multi-scale numerical tools able to simulate the effects of irradiation on materials microstructure. The consequences of irradiation on mechanical and corrosion properties of materials are also tentatively modelled using such multi-scale modelling. But it requires to develop different mechanistic models at different levels of physics and engineering and to extend the state of knowledge in several scientific fields. And the links between these different kinds of models are particularly delicate to deal with and need specific works. Practically the main objective of PERFECT is to build

  7. First quarter 2005 sales data

    International Nuclear Information System (INIS)

    2005-04-01

    This press release brings information on the AREVA group sales data. First quarter 2005 sales for the group were 2,496 millions of euros, up 3,6% year-on-year from 2,41 millions. The change in foreign exchange rates between the two periods show a negative impact of 22 millions euros, which is much lower than in the first quarter of 2004. It analyzes also in more details the situation of the front end, the reactors and service division, the back end division, the transmission and distribution division and the connectors division. (A.L.B.)

  8. First stage of INTRAMAP: INtegrated Transantarctic Mountains and Ross Sea Area Magnetic Anomaly Project

    Directory of Open Access Journals (Sweden)

    D. Damaske

    1999-06-01

    Full Text Available INTRAMAP (INtegrated Transantarctic Mountains and Ross Sea Area Magnetic Anomaly Project is an international effort to merge the magnetic data acquired throughout the "Ross Sea Antarctic Sector" (south of 60°S between 135°-255°E including the Transantarctic Mountains (TAM, the Ross Sea, Marie Byrd Land, and the Pacific coast, and also to begin the compilation efforts for new data over the Wilkes Basin. This project is a component of the continental scale Antarctic Digital Magnetic Anomaly Project (ADMAP. The first stage of INTRAMAP addresses the analysis and merging of GITARA (1991-1994 and GANOVEX (1984 aeromagnetic surveys together with ground magnetic data (1984-1989. The combined data sets cover an area of approximately 30 km2 over Victoria Land and adjacent Ross Sea. Map and profile gridding were implemented to integrate the data sets. These approaches are studied for improving existing strategies to adopt for the whole magnetic compilation effort. The final microlevelled grid that we produce is a new tool for regional interpretation of the main tectonic and geologic features of this sector of Antarctica.

  9. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating the location of currently operating facilities is provided as Figure A. Of the 240 signed contracts and committed projects, 75 were cogeneration, solid waste, or biomass projects with a potential of 740 MW. PG and E also had under active discussion 32 cogeneration projects that could generate a total of 858 MW to 921 MW, and 10 solid waste/biomass projects with a potential of 113 MW to 121 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 19, with a generating capability of 471 MW. Also, discussions are being conducted with 12 wind farm projects, totaling 273 to 278 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 10 other projects under active discussion. There are 47 hydroelectric projects with signed contracts and a potential of 110 MW, as well as 65 projects under active discussion for 175 MW. In addition, there are 30 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of June 30, 1983.

  10. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

  11. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

  12. Sustainable Bridges – A European Integrated Research Project – Background Overview and Results

    DEFF Research Database (Denmark)

    Täljsten, Björn; Elfgren, Lennart

    2008-01-01

    of energy and release of greenhouse gases. To help our society to be more sustainable, it is important to retain and use what we already have where possible, rather than investing in new structures. Instead of tearing down old, often beautiful, railway bridges and replacing them with new ones, we need...... to preserve and upgrade them by using better assessment, monitoring and strengthening methods. This was also the aim of the European Integrated Research Project “Sustainable Bridges – Assessment for Future Traffic Demands and Longer Lives” when it was accepted for funding by the European Commission in 2003....... The project established the following three specific goals: 1. increase the transport capacity of existing railway bridges by allowing higher axle loads (up to 33 tons) for freight traffic at moderate speeds or by allowing higher speeds (up to 350 km/hour) for passenger traffic with low axle loads 2. extend...

  13. How does an ICT-competent mathematics teacher benefit from an ICT-integrative project?

    DEFF Research Database (Denmark)

    Skott, Charlotte Krog; Østergaard, Camilla Hellsten

    2016-01-01

    . We use a theoretical framework for classroom mathematical practices to conceptualise teachers´ learning from a participatory perspective. On the one hand, the teacher realises a potential for a more dialogical approach to teaching. On the other hand, she appears to maintain her habits in relation......We investigate an ICT-competent mathematics teacher’s potentials for professional development as she participates in a sixth-grade statistics project aimed at developing practices that integrate ICTs. This is a critical case study, partly because the teacher is not challenged by the proposed ICTs...... to ICT-use. These contrary tendencies negatively influence the students’ learning opportunities. We offer explanations for why the teacher seems to sticks with her ICT-habits as well as suggestions for future research- and development projects....

  14. Highly Integrated Mixed-Mode Electronics for the readout of Time Projection Chambers

    CERN Document Server

    França Santos, Hugo Miguel; Musa, Luciano

    Time Projection Chambers (TPCs) are one of the most prevalent particle trackers for high-energy physics experiments. Future planed TPCs for the International Linear Collider (ILC) and the Compact Linear Collider (CLIC) entail very high spatial resolution in large gas volumes, but impose low material budget for the end caps of the TPC cylinder. This constraint is not accomplished with the state-of-the-art front-end electronics because of its unsuited relatively large mass and of its associated water cooling system. To reach the required material budget, highly compact and power efficient dedicated TPC front-end electronics should be developed. This project aims at re-designing the different electronic elements with significant improvements in terms of performance, power efficiency and versatility, and developing an integrated circuit that merges all components of the front-end electronics. This chip ambitions a large volume production at low unitary cost and its employment in multiple detectors. The design of ...

  15. Spent fuel and radioactive waste: an integrated data base of inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    Notz, K.J.; Forsberg, C.W.; Mastal, E.F.

    1984-01-01

    The Integrated Data Base (IDB) Program provides official US Department of Energy (DOE) data on spent fuel and radioactive waste inventories, projections, and characteristics. This information is provided through the cooperative efforts of the IDB Program and DOE lead offices, lead sites, major programs, and generator sites. The program is entering its fifth year, and major accomplishments are summarized in three broad areas: (1) the annual inventory report, including ORIGEN2 applications and a Quality Assurance (QA) plan; (2) the summary data file and direct user access; and (3) data processing methodology and support to other programs. Plans for future work in these areas are outlined briefly, including increased utilization of personal computers. Some examples of spent fuel data are given in terms of projected quantities for two growth scenarios, burnup and age profile of the existing inventory, and the approximate specific thermal power relative to high-level waste (HLW) from various sources. 4 refs., 2 figs., 3 tabs

  16. Service user integration into social work education: lessons learned from nordic participatory action projects.

    Science.gov (United States)

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education.

  17. Genetics of healthy aging in Europe: the EU-integrated project GEHA (GEnetics of Healthy Aging)

    DEFF Research Database (Denmark)

    Franceschi, Claudio; Bezrukov, Vladyslav; Blanché, Hélène

    2007-01-01

    The aim of the 5-year European Union (EU)-Integrated Project GEnetics of Healthy Aging (GEHA), constituted by 25 partners (24 from Europe plus the Beijing Genomics Institute from China), is to identify genes involved in healthy aging and longevity, which allow individuals to survive to advanced old......DNA). The genetic analysis will be performed by 9 high-throughput platforms, within the framework of centralized databases for phenotypic, genetic, and mtDNA data. Additional advanced approaches (bioinformatics, advanced statistics, mathematical modeling, functional genomics and proteomics, molecular biology...... age in good cognitive and physical function and in the absence of major age-related diseases. To achieve this aim a coherent, tightly integrated program of research that unites demographers, geriatricians, geneticists, genetic epidemiologists, molecular biologists, bioinfomaticians, and statisticians...

  18. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.; Hakiki, Farizal; Syihab, Z.; Ambia, F.; Yasutra, A.; Sutopo, S.; Efendi, M.; Sitompul, V.; Primasari, I.; Apriandi, R.

    2017-01-01

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  19. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.

    2017-10-17

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  20. TOLD LIKE IT IS! AN EVALUATION OF AN INTEGRATED ORAL DEVELOPMENT PILOT PROJECT

    Directory of Open Access Journals (Sweden)

    David Barr

    2005-09-01

    Full Text Available Much established pedagogical and CALL (computer-assisted language learning research advocates an integrated constructivist approach to the use of technology in language learning. This paper reports on a pilot project delivered to first year undergraduate French students. The project aim was to deliver a blend of collaborative and individual learning through a combination of CALL programs and online activities alongside traditional face-to-face conversation classes. Using quantitative analysis of a pre- and posttest and a variety of questionnaires, this project assessed student progress in developing oral skills across two groups, one (the treatment group using technology and the other (the comparison group being a traditional conversation class. Each group covered the same content and underwent the same assessment procedures. In addition, through qualitative analysis measures, the project evaluated the role played by additional variables in the learning process, as well as student and staff reactions to the two approaches. The study concludes by showing that while progress was made by both groups, the progress made by those not using technology was significantly greater than that made by students using technology over a short-term study. It also highlights the need for developing pedagogy to ensure that CALL-based teaching goes beyond rehearsal activity to achieve message-orientated communication.

  1. Critical chain project management and drum-buffer-rope tools integration in construction industry - case study

    Directory of Open Access Journals (Sweden)

    Piotr Cyplik

    2012-03-01

    Full Text Available Background: The concept of integrating the theory of constraints tools in reorganizing management system in a mechanical engineering company was presented in this article. The main aim of the concept is to enable the enterprise to satisfy the customers' expectations at reasonable costs, which allows for making a profit and creating an agile enterprise in the long run. Methods: Due to the individual character of the production process and service process in analyzed company, the described concept using theory of constraints project management (CCPM and manufacturing (DBR tools. The authors use performance levels conception to build an integration tool focused on the interaction and collaboration between different departments. The integration tool has been developed and verified in Polish manufacturing company. Results: In described model a tool compatible with CCPM operates on the level of the customer service process. Shop floor is controlled based on the DBR method. The authors hold that the integration of between TOC tools is of key importance. The integration of TOC tools dedicated to managing customer service and shop floor scheduling and controlling requires developing a mechanism for repeated transmitting the information between them. This mechanism has been developed. Conclusions: The conducted research showed that the developed tool integrating CCPM and DBR had a positive impact on the enterprise performance. It enables improving the company performance in meeting target group requirements by focusing on enhancing the efficiency of processes running in the company and tasks processed at particular work stations. The described model has been successfully implemented in one of the Polish mechanical engineering companies.

  2. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  3. Integrated disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2007-09-01

    This report summarizes the first year survival of sagebrush seedlings planted as compensatory mitigation for the Integrated Disposal Facility Project. Approximately 42,600 bare root seedlings and 26,000 pluglings were planted at a mitigation site along Army Loop Road in February 2007. Initial baseline monitoring occurred in March 2007, and first summer survival was assessed in September 2007. Overall survival was 19%, with bare root survival being marginally better than pluglings (21% versus 14%). Likely major factors contributing to low survival were late season planting and insufficient soil moisture during seedling establishment.

  4. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  5. Integrated Vehicle Health Management Project-Modeling and Simulation for Wireless Sensor Applications

    Science.gov (United States)

    Wallett, Thomas M.; Mueller, Carl H.; Griner, James H., Jr.

    2009-01-01

    This paper describes the efforts in modeling and simulating electromagnetic transmission and reception as in a wireless sensor network through a realistic wing model for the Integrated Vehicle Health Management project at the Glenn Research Center. A computer model in a standard format for an S-3 Viking aircraft was obtained, converted to a Microwave Studio software format, and scaled to proper dimensions in Microwave Studio. The left wing portion of the model was used with two antenna models, one transmitting and one receiving, to simulate radio frequency transmission through the wing. Transmission and reception results were inconclusive.

  6. Hardware and Software Integration in Project Development of Automated Controller System Using LABVIEW FPGA

    International Nuclear Information System (INIS)

    Mohd Khairulezwan Abd Manan; Mohd Sabri Minhat; Izhar Abu Hussin

    2014-01-01

    The Field-Programmable Gate Array (FPGA) is a semiconductor device that can be programmed after manufacturing. Instead of being restricted to any predetermined hardware function, an FPGA allows user to program product features and functions, adapt to new standards, and reconfigure hardware for specific applications even after the product has been installed in the field, hence the name field-programmable. This project developed a control system using LabVIEW FPGA. LabVIEW FPGA is easier where it is programmed by using drag and drop icon. Then it will be integrated with the hardware input and output. (author)

  7. Tourism, poaching and wildlife conservation: what can integrated conservation and development projects accomplish?

    Energy Technology Data Exchange (ETDEWEB)

    Johannesen, Anne Borge; Skonhoft, Anders [Department of Economics, Norwegian University of Science and Technology, N-7491 Trondheim, Dragvoll (Norway)

    2005-10-15

    Integrated conservation and development projects (ICDPs) have frequently been established in Africa to improve wildlife conservation and the welfare of local communities. However, their effectiveness has been hampered by conflicts and illegal harvesting. This paper focuses on the strategic interaction between the manager of a protected area and a group of local people. The park manager benefits from wildlife through tourism and hunting. The local people benefit through hunting, but also bear the wildlife damage. ICDPs relying on money transfers to the local people from the park manager may or may not promote wildlife conservation. In addition, the welfare of the local people are ambiguous. (author) [Wildlife; Conservation; Conflicts; Local welfare].

  8. The MIRAGE project: large scale radionuclide transport investigations and integral migration experiments

    International Nuclear Information System (INIS)

    Come, B.; Bidoglio, G.; Chapman, N.

    1986-01-01

    Predictions of radionuclide migration through the geosphere must be supported by large-scale, long-term investigations. Several research areas of the MIRAGE Project are devoted to acquiring reliable data for developing and validating models. Apart from man-made migration experiments in boreholes and/or underground galleries, attention is paid to natural geological migration systems which have been active for very long time spans. The potential role of microbial activity, either resident or introduced into the host media, is also considered. In order to clarify basic mechanisms, smaller scale ''integral'' migration experiments under fully controlled laboratory conditions are also carried out using real waste forms and representative geological media. (author)

  9. A Domain Specific Embedded Language in C++ for Automatic Differentiation, Projection, Integration and Variational Formulations

    Directory of Open Access Journals (Sweden)

    Christophe Prud'homme

    2006-01-01

    Full Text Available In this article, we present a domain specific embedded language in C++ that can be used in various contexts such as numerical projection onto a functional space, numerical integration, variational formulations and automatic differentiation. Albeit these tools operate in different ways, the language overcomes this difficulty by decoupling expression constructions from evaluation. The language is implemented using expression templates and meta-programming techniques and uses various Boost libraries. The language is exercised on a number of non-trivial examples and a benchmark presents the performance behavior on a few test problems.

  10. The Symbiose project: an integrated framework for performing environmental radiological risk assessment

    International Nuclear Information System (INIS)

    Gonze, M.A.; Mourlon, C.; Garcia-Sanchez, L.; Beaugelin, K.; Chen, T.; Le Dizes, S.

    2004-01-01

    Human health and ecological risk assessments usually require the integration of a wide range of environmental data and modelling approaches, with a varying level of detail dependent on the management objectives, the complexity of the site and the level of ignorance about the pollutant behaviour/toxicity. Like most scientists and assessors did it recently, we recognized the need for developing comprehensive, integrated and flexible approaches to risk assessment. To meet these needs, IRSN launched the Symbiose project (2002-2006) which aims first, at designing a framework for integrating and managing data, methods and knowledge of some relevance in radiological risk to humans/biota assessment studies, and second, at implementing this framework in an information management, modelling and calculation platform. Feasibility developments (currently completed) led to the specification of a fully integrated, object-oriented and hierarchical approach for describing the fate, transport and effect of radionuclides in spatially-distributed environmental systems. This innovative approach has then been implemented in a platform prototype, main components of which are a user-friendly and modular simulation environment (e.g. using GoldSim toolbox), and a hierarchical object-oriented biosphere database. Both conceptual and technical developments will be presented here. (author)

  11. Energy situation - Fourth quarter 2017

    International Nuclear Information System (INIS)

    Guggemos, Fabien; Misak, Evelyne; Mombel, David; Moreau, Sylvain

    2018-02-01

    This publication presents, first, a quarterly report of the French energy situation: primary energy consumption, energy independence and CO 2 emissions, national production, imports, exports, energy costs, average and spot prices. Data are presented separately for solid mineral fuels, petroleum products, natural gas and electricity. The methodology, the definitions and the corrections used are explained in a second part

  12. NST Quarterly - issue October 2001

    International Nuclear Information System (INIS)

    2001-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it reviews GM technology and GMOs - genetically modified organisms. The topics discussed includes the implication of GM in practice, the controversy and the prospect of GM technology. Radioactive pig - something like a ball or plug which cleanses the inner walls of the pipeline, also briefly presented

  13. NST Quarterly - October 1997 issue

    International Nuclear Information System (INIS)

    1997-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in scientific computer modelling and simulation. A report on 2-nd FAO/IAEA research coordination meeting (RCM) of the coordinated research programme (CRP) on public acceptance of the trade development in irradiated food in Asia and the Pacific (RPFI-IV) also presented

  14. NST Quarterly. January 1996 issue

    International Nuclear Information System (INIS)

    1996-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in nuclear medicine, healthcare products sterilization, industrial irradiation dosimetry and heavy metals determination in food. The Malaysian standard for food irradiation was discussed in this issue

  15. NST Quarterly - April 2000 issue

    International Nuclear Information System (INIS)

    1999-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in genetic engineering. The articles summarized the improvement of orchids and tulips through genetic engineering and generating new varieties for the floriculture industry. It also reported, MINT won gold and silver at the International Invention 2000, 12-16 April 2000, Geneva

  16. Quarter 9 Mercury information clearinghouse final report

    Energy Technology Data Exchange (ETDEWEB)

    Laudal, D.L.; Miller, S.; Pflughoeft-Hassett, D.; Ralston, N.; Dunham, G.; Weber, G.

    2005-12-15

    The Canadian Electricity Association (CEA) identified a need and contracted the Energy & Environmental Research Center (EERC) to create and maintain an information clearinghouse on global research and development activities related to mercury emissions from coal-fired electric utilities. A total of eight reports were completed and are summarized and updated in this final CEA quarterly report. Selected topics were discussed in detail in each quarterly report. Issues related to mercury from coal-fired utilities include the general areas of measurement, control, policy, and transformations. Specific topics that have been addressed in previous quarterly reports include the following: Quarterly 1 - Sorbent Control Technologies for Mercury Control; Quarterly 2 - Mercury Measurement; Quarterly 3 - Advanced and Developmental Mercury Control Technologies; Quarterly 4 - Prerelease of Mercury from Coal Combustion By-Products; Quarterly 5 - Mercury Fundamentals; Quarterly 6 - Mercury Control Field Demonstrations; Quarterly 7 - Mercury Regulations in the United States: Federal and State; and Quarterly 8 - Commercialization Aspects of Sorbent Injection Technologies in Canada. In this last of nine quarterly reports, an update of these mercury issues is presented that includes a summary of each topic, with recent information pertinent to advances made since the quarterly reports were originally presented. In addition to a comprehensive update of previous mercury-related topics, a review of results from the CEA Mercury Program is provided. 86 refs., 11 figs., 8 tabs.

  17. Curriculum Integration in Distance Learning at Primary and Secondary Educational Levels on the Example of eTwinning Projects

    Directory of Open Access Journals (Sweden)

    Elżbieta Gajek

    2017-12-01

    Full Text Available Curriculum integration is one of the concepts which has been discussed for years. Telecollaborative projects, which employ elements of distance learning, provide opportunities for putting the idea into practice. Analysis of eTwinning projects undertaken in Polish schools aims at demonstrating the integrative role of distance learning approaches and their contribution to integration of various themes in educational context. As the eTwinning framework is very flexible, allowing for teacher and students autonomy the projects may vary in the topics, age and number of participants, duration scope within curriculum etc. The study shows various levels and perspectives of curriculum integration which take place in eTwinning projects. It also discusses the role of distance learning at primary and secondary educational levels. The challenge is to transform international collaboration of selected schools an everyday practice for all learners and teachers.

  18. The Saale-Project -A multidisciplinary approach towards sustainable integrative catchment management -

    Science.gov (United States)

    Bongartz, K.; Flügel, W. A.

    2003-04-01

    In the joint research project “Development of an integrated methodology for the sustainable management of river basins The Saale River Basin example”, coordinated by the Centre of Environmental Research (UFZ), concepts and tools for an integrated management of large river basins are developed and applied for the Saale river basin. The ultimate objective of the project is to contribute to the holistic assessment and benchmarking approaches in water resource planning, as required by the European Water Framework Directive. The study presented here deals (1) with the development of a river basin information and modelling system, (2) with the refinement of a regionalisation approach adapted for integrated basin modelling. The approach combines a user friendly basin disaggregation method preserving the catchment’s physiographic heterogeneity with a process oriented hydrological basin assessment for scale bridging integrated modelling. The well tested regional distribution concept of Response Units (RUs) will be enhanced by landscape metrics and decision support tools for objective, scale independent and problem oriented RU delineation to provide the spatial modelling entities for process oriented and distributed simulation of vertical and lateral hydrological transport processes. On basis of this RUs suitable hydrological modelling approaches will be further developed with strong respect to a more detailed simulation of the lateral surface and subsurface flows as well as the channel flow. This methodical enhancement of the well recognised RU-concept will be applied to the river basin of the Saale (Ac: 23 179 km2) and validated by a nested catchment approach, which allows multi-response-validation and estimation of uncertainties of the modelling results. Integrated modelling of such a complex basin strongly influenced by manifold human activities (reservoirs, agriculture, urban areas and industry) can only be achieved by coupling the various modelling approaches

  19. The Role Of The Integrated, Thematic Project To Learning Progress Of The Child In The Early Period

    Directory of Open Access Journals (Sweden)

    Aida Cornelia Stoian

    2016-12-01

    Full Text Available In this study, we have proposed to present you the results of an empirical research in order to identify the positive aspects of the integrated, thematic project in learning progress of children in preschool. Using the observation method, we analyzed children's results regarding the objectives in the respect to the objectives in the grid. Children's progress in learning represents the confirmation and affirmation of the role of this integrated, thematic project in supporting the early learning child.

  20. Quarterly, Bi-annual and Annual Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Quarterly, Bi-annual and Annual Reports are periodic reports issued for public release. For the deep set fishery these reports are issued quarterly and anually....