  1. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  2. Environmental Survey preliminary report, Idaho National Engineering Laboratory, Idaho Falls, Idaho and Component Development and Integration Facility, Butte, Montana

    International Nuclear Information System (INIS)

    1988-09-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations' carried on at the INEL and the CDIF, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S ampersand A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S ampersand A Plan will be executed by the Oak Ridge National Laboratory. When completed, the S ampersand A results will be incorporated into the INEL/CDIF Survey findings for inclusion into the Environmental Survey Summary Report. 90 refs., 95 figs., 77 tabs

  3. Environmental Survey preliminary report, Idaho National Engineering Laboratory, Idaho Falls, Idaho and Component Development and Integration Facility, Butte, Montana

    Energy Technology Data Exchange (ETDEWEB)

    1988-09-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations' carried on at the INEL and the CDIF, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S A Plan will be executed by the Oak Ridge National Laboratory. When completed, the S A results will be incorporated into the INEL/CDIF Survey findings for inclusion into the Environmental Survey Summary Report. 90 refs., 95 figs., 77 tabs.

  4. Coal-fired MHD test progress at the Component Development and Integration Facility

    International Nuclear Information System (INIS)

    Hart, A.T.; Rivers, T.J.; Alsberg, C.M.; Filius, K.D.

    1992-01-01

    The Component Development and Integration Facility (CDIF) is a Department of Energy test facility operated by MSE, Inc. In the fall of 1984, a 50-MW t , pressurized, slag rejecting coal-fired combustor (CFC) replaced the oil-fired combustor in the test train. In the spring of 1989, a coal-fired precombustor was added to the test hardware, and current controls were installed in the spring of 1990. In the fall of 1990, the slag rejector was installed. MSE test hardware activities included installing the final workhorse channel and modifying the coalfired combustor by installing improved design and proof-of-concept (POC) test pieces. This paper discusses the involvement of this hardware in test progress during the past year. Testing during the last year emphasized the final workhorse hardware testing. This testing will be discussed. Facility modifications and system upgrades for improved operation and duration testing will be discussed. In addition, this paper will address long-term testing plans

  5. MHD Integrated Topping Cycle Project

    Science.gov (United States)

    1993-04-01

    Manufacture, assembly, and checkout of combustion subsystem hardware was completed and the hardware was delivered to CDIF along with the water electrical isolators. A successful nozzle proof test was concluded; its purpose was to evaluate adequacy of the nozzle structure and sealing of sidewall-to-electrode wall joints, water tubes, and stud and wire penetrations at operating pressure. Design modifications to spare channel inlet frame were made to enable iron oxide injection. Results of tests in the CDIF 1A1 channel which compared effect of different cathode wall iron oxide injection locations indicated that injection through the side port may be more effective, particularly if one of the two ports becomes clogged. Design confirmation testing of a pneumatically driven ram to clear a plugged iron oxide injector tip was performed. Manufacture of spare and replacement parts for 1A4 channel and diffuser was begun. Construction of the cathode power cabinets and associated control system was completed. Hot-fire checkout series was completed for the combustion subsystem; 16.8 thermal hours were accumulated during seven tests. This test series demonstrated adequacy of overall cooling of combustion subsystem and provided an initial evaluation of heat losses and slagging characteristics. Several major facility activities at the CDIF were accomplished including installation and testing of new iron oxide pumps, initial on-line checkout of coal feed system modifications, modification of seed system including replacement of silo rotary feeder, installation of new filter receiver on the silo, conversion of fly ash bin to dust collector, removal of all of the electrical wiring (used for 1A1 channel) between the channel and HVR in order to install 1A4 wiring, and installation of the 1A4 channel.

  6. Design and fabrication of a 50 MWt prototypical MHD coal-fired combustor

    International Nuclear Information System (INIS)

    Albright, J.; Braswell, R.; Listvinsky, G.; McAllister, M.; Myrick, S.; Ono, D.; Thom, H.

    1992-01-01

    A prototypical 50 MWt coal-fired combustor has been designed and fabricated as part of the Magnetohydrodynamic (MHD) Integrated Topping Cycle (ITC) Program. This is a DOE-funded program to develop a prototypical MHD power train to be tested at the Component Development and Integration Facility (CDIF) in Butte, Montana. The prototypical combustor is an outgrowth of the 50 MWt workhorse combustor which has previously been tested at the CDIF. In addition to meeting established performance criteria of the existing 50 MWt workhorse combustor, the prototypical combustor design is required to be scaleable for use at the 250 MWt retrofit level. This paper presents an overview of the mechanical design of the prototypical combustor and a description of its fabrication. Fabrication of the 50 MWt prototypical coal-fired combustor was completed in February 1992 and hot-fire testing is scheduled to begin in May 1992

  7. Energy Systems Integration Facility Videos | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Energy Systems Integration Facility Videos Energy Systems Integration Facility Integration Facility NREL + SolarCity: Maximizing Solar Power on Electrical Grids Redefining What's Possible for Renewable Energy: Grid Integration Robot-Powered Reliability Testing at NREL's ESIF Microgrid

  8. Energy Systems Integration Facility News | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Energy Systems Integration Facility News Energy Systems Integration Facility Energy Dataset A massive amount of wind data was recently made accessible online, greatly expanding the Energy's National Renewable Energy Laboratory (NREL) has completed technology validation testing for Go

  9. Integrated Disposal Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Located near the center of the 586-square-mile Hanford Site is the Integrated Disposal Facility, also known as the IDF.This facility is a landfill similar in concept...

  10. MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-01

    This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

  11. Power Systems Integration Laboratory | Energy Systems Integration Facility

    Science.gov (United States)

    | NREL Power Systems Integration Laboratory Power Systems Integration Laboratory Research in the Energy System Integration Facility's Power Systems Integration Laboratory focuses on the microgrid applications. Photo of engineers testing an inverter in the Power Systems Integration Laboratory

  12. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov (United States)

    the Energy Systems Integration Facility as part of NREL's work with SolarCity and the Hawaiian Electric Companies. Photo by Amy Glickson, NREL Welcome to Energy Systems Integration News, NREL's monthly date on the latest energy systems integration (ESI) developments at NREL and worldwide. Have an item

  13. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  14. Integrated Facilities and Infrastructure Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Reisz Westlund, Jennifer Jill

    2017-03-01

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

  15. The Integral Test Facility Karlstein

    Directory of Open Access Journals (Sweden)

    Stephan Leyer

    2012-01-01

    Full Text Available The Integral Test Facility Karlstein (INKA test facility was designed and erected to test the performance of the passive safety systems of KERENA, the new AREVA Boiling Water Reactor design. The experimental program included single component/system tests of the Emergency Condenser, the Containment Cooling Condenser and the Passive Core Flooding System. Integral system tests, including also the Passive Pressure Pulse Transmitter, will be performed to simulate transients and Loss of Coolant Accident scenarios at the test facility. The INKA test facility represents the KERENA Containment with a volume scaling of 1 : 24. Component heights and levels are in full scale. The reactor pressure vessel is simulated by the accumulator vessel of the large valve test facility of Karlstein—a vessel with a design pressure of 11 MPa and a storage capacity of 125 m3. The vessel is fed by a benson boiler with a maximum power supply of 22 MW. The INKA multi compartment pressure suppression Containment meets the requirements of modern and existing BWR designs. As a result of the large power supply at the facility, INKA is capable of simulating various accident scenarios, including a full train of passive systems, starting with the initiating event—for example pipe rupture.

  16. Thermal Distribution System | Energy Systems Integration Facility | NREL

    Science.gov (United States)

    Thermal Distribution System Thermal Distribution System The Energy Systems Integration Facility's . Photo of the roof of the Energy Systems Integration Facility. The thermal distribution bus allows low as 10% of its full load level). The 60-ton chiller cools water with continuous thermal control

  17. INTEGRATION OF FACILITY MODELING CAPABILITIES FOR NUCLEAR NONPROLIFERATION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Gorensek, M.; Hamm, L.; Garcia, H.; Burr, T.; Coles, G.; Edmunds, T.; Garrett, A.; Krebs, J.; Kress, R.; Lamberti, V.; Schoenwald, D.; Tzanos, C.; Ward, R.

    2011-07-18

    Developing automated methods for data collection and analysis that can facilitate nuclear nonproliferation assessment is an important research area with significant consequences for the effective global deployment of nuclear energy. Facility modeling that can integrate and interpret observations collected from monitored facilities in order to ascertain their functional details will be a critical element of these methods. Although improvements are continually sought, existing facility modeling tools can characterize all aspects of reactor operations and the majority of nuclear fuel cycle processing steps, and include algorithms for data processing and interpretation. Assessing nonproliferation status is challenging because observations can come from many sources, including local and remote sensors that monitor facility operations, as well as open sources that provide specific business information about the monitored facilities, and can be of many different types. Although many current facility models are capable of analyzing large amounts of information, they have not been integrated in an analyst-friendly manner. This paper addresses some of these facility modeling capabilities and illustrates how they could be integrated and utilized for nonproliferation analysis. The inverse problem of inferring facility conditions based on collected observations is described, along with a proposed architecture and computer framework for utilizing facility modeling tools. After considering a representative sampling of key facility modeling capabilities, the proposed integration framework is illustrated with several examples.

  18. Integration of facility modeling capabilities for nuclear nonproliferation analysis

    International Nuclear Information System (INIS)

    Garcia, Humberto; Burr, Tom; Coles, Garill A.; Edmunds, Thomas A.; Garrett, Alfred; Gorensek, Maximilian; Hamm, Luther; Krebs, John; Kress, Reid L.; Lamberti, Vincent; Schoenwald, David; Tzanos, Constantine P.; Ward, Richard C.

    2012-01-01

    Developing automated methods for data collection and analysis that can facilitate nuclear nonproliferation assessment is an important research area with significant consequences for the effective global deployment of nuclear energy. Facility modeling that can integrate and interpret observations collected from monitored facilities in order to ascertain their functional details will be a critical element of these methods. Although improvements are continually sought, existing facility modeling tools can characterize all aspects of reactor operations and the majority of nuclear fuel cycle processing steps, and include algorithms for data processing and interpretation. Assessing nonproliferation status is challenging because observations can come from many sources, including local and remote sensors that monitor facility operations, as well as open sources that provide specific business information about the monitored facilities, and can be of many different types. Although many current facility models are capable of analyzing large amounts of information, they have not been integrated in an analyst-friendly manner. This paper addresses some of these facility modeling capabilities and illustrates how they could be integrated and utilized for nonproliferation analysis. The inverse problem of inferring facility conditions based on collected observations is described, along with a proposed architecture and computer framework for utilizing facility modeling tools. After considering a representative sampling of key facility modeling capabilities, the proposed integration framework is illustrated with several examples.

  19. Integration Of Facility Modeling Capabilities For Nuclear Nonproliferation Analysis

    International Nuclear Information System (INIS)

    Gorensek, M.; Hamm, L.; Garcia, H.; Burr, T.; Coles, G.; Edmunds, T.; Garrett, A.; Krebs, J.; Kress, R.; Lamberti, V.; Schoenwald, D.; Tzanos, C.; Ward, R.

    2011-01-01

    Developing automated methods for data collection and analysis that can facilitate nuclear nonproliferation assessment is an important research area with significant consequences for the effective global deployment of nuclear energy. Facility modeling that can integrate and interpret observations collected from monitored facilities in order to ascertain their functional details will be a critical element of these methods. Although improvements are continually sought, existing facility modeling tools can characterize all aspects of reactor operations and the majority of nuclear fuel cycle processing steps, and include algorithms for data processing and interpretation. Assessing nonproliferation status is challenging because observations can come from many sources, including local and remote sensors that monitor facility operations, as well as open sources that provide specific business information about the monitored facilities, and can be of many different types. Although many current facility models are capable of analyzing large amounts of information, they have not been integrated in an analyst-friendly manner. This paper addresses some of these facility modeling capabilities and illustrates how they could be integrated and utilized for nonproliferation analysis. The inverse problem of inferring facility conditions based on collected observations is described, along with a proposed architecture and computer framework for utilizing facility modeling tools. After considering a representative sampling of key facility modeling capabilities, the proposed integration framework is illustrated with several examples.

  20. Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Juan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Anderson, Art [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-02

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations. This plan is a living document that will be updated and refined throughout the lifetime of the facility.

  1. Natural circulation in an integral CANDU test facility

    International Nuclear Information System (INIS)

    Ingham, P.J.; Sanderson, T.V.; Luxat, J.C.; Melnyk, A.J.

    2000-01-01

    Over 70 single- and two-phase natural circulation experiments have been completed in the RD-14M facility, an integral CANDU thermalhydraulic test loop. This paper describes the RD-14M facility and provides an overview of the impact of key parameters on the results of natural circulation experiments. Particular emphasis will be on phenomena which led to heat up at high system inventories in a small subset of experiments. Clarification of misunderstandings in a recently published comparison of the effectiveness of natural circulation flows in RD-14M to integral facilities simulating other reactor geometries will also be provided. (author)

  2. Multiloop Integral System Test (MIST): MIST Facility Functional Specification

    International Nuclear Information System (INIS)

    Habib, T.F.; Koksal, C.G.; Moskal, T.E.; Rush, G.C.; Gloudemans, J.R.

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock ampersand Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs

  3. Integration of facility modeling capabilities for nuclear nonproliferation analysis

    International Nuclear Information System (INIS)

    Burr, Tom; Gorensek, M.B.; Krebs, John; Kress, Reid L.; Lamberti, Vincent; Schoenwald, David; Ward, Richard C.

    2012-01-01

    Developing automated methods for data collection and analysis that can facilitate nuclearnonproliferation assessment is an important research area with significant consequences for the effective global deployment of nuclear energy. Facilitymodeling that can integrate and interpret observations collected from monitored facilities in order to ascertain their functional details will be a critical element of these methods. Although improvements are continually sought, existing facilitymodeling tools can characterize all aspects of reactor operations and the majority of nuclear fuel cycle processing steps, and include algorithms for data processing and interpretation. Assessing nonproliferation status is challenging because observations can come from many sources, including local and remote sensors that monitor facility operations, as well as open sources that provide specific business information about the monitored facilities, and can be of many different types. Although many current facility models are capable of analyzing large amounts of information, they have not been integrated in an analyst-friendly manner. This paper addresses some of these facilitymodelingcapabilities and illustrates how they could be integrated and utilized for nonproliferationanalysis. The inverse problem of inferring facility conditions based on collected observations is described, along with a proposed architecture and computer framework for utilizing facilitymodeling tools. After considering a representative sampling of key facilitymodelingcapabilities, the proposed integration framework is illustrated with several examples.

  4. Double-shell tank waste transfer facilities integrity assessment plan

    International Nuclear Information System (INIS)

    Hundal, T.S.

    1998-01-01

    This document presents the integrity assessment plan for the existing double-shell tank waste transfer facilities system in the 200 East and 200 West Areas of Hanford Site. This plan identifies and proposes the integrity assessment elements and techniques to be performed for each facility. The integrity assessments of existing tank systems that stores or treats dangerous waste is required to be performed to be in compliance with the Washington State Department of Ecology Dangerous Waste Regulations, Washington Administrative Code WAC-173-303-640 requirements

  5. Development of an integrated assay facility

    International Nuclear Information System (INIS)

    Molesworth, T.V.; Bailey, M.; Findlay, D.J.S.; Parsons, T.V.; Sene, M.R.; Swinhoe, M.T.

    1990-01-01

    The I.R.I.S. concept proposed the use of passive examination and active interrogation techniques in an integrated assay facility. A linac would generate the interrogating gamma and neutron beams. Insufficiently detailed knowledge about active neutron and gamma interrogation of 500 litre drums of cement immobilised intermediate level waste led to a research programme which is now in its main experimental stage. Measurements of interrogation responses are being made using simulated waste drums containing actinide samples and calibration sources, in an experimental assay assembly. Results show that responses are generally consistent with theory, but that improvements are needed in some areas. A preliminary appraisal of the engineering and economic aspects of integrated assay shows that correct operational sequencing is required to achieve the short cycle time needed for high throughput. The main engineering features of a facility have been identified

  6. An integrated lean-methods approach to hospital facilities redesign.

    Science.gov (United States)

    Nicholas, John

    2012-01-01

    Lean production methods for eliminating waste and improving processes in manufacturing are now being applied in healthcare. As the author shows, the methods are appropriate for redesigning hospital facilities. When used in an integrated manner and employing teams of mostly clinicians, the methods produce facility designs that are custom-fit to patient needs and caregiver work processes, and reduce operational costs. The author reviews lean methods and an approach for integrating them in the redesign of hospital facilities. A case example of the redesign of an emergency department shows the feasibility and benefits of the approach.

  7. Integrated network for structural integrity monitoring of critical components in nuclear facilities, RIMIS

    International Nuclear Information System (INIS)

    Roth, Maria; Constantinescu, Dan Mihai; Brad, Sebastian; Ducu, Catalin; Malinovschi, Viorel

    2008-01-01

    The round table aims to join specialists working in the research area of the Romanian R and D Institutes and Universities involved in structural integrity assessment of materials, especially those working in the nuclear field, together with the representatives of the end user, the Cernavoda NPP. This scientific event will offer the opportunity to disseminate the theoretical, experimental and modelling activities, carried out to date, in the framework of the National Program 'Research of Excellence', Module I 2006-2008, managed by the National Authority for Scientific Research. Entitled 'Integrated Network for Structural Integrity Monitoring of Critical Components in Nuclear Facilities, RIMIS, the project has two main objectives: 1. - to elaborate a procedure applicable to the structural integrity assessment of critical components used in Romanian nuclear facilities (CANDU type Reactor, Hydrogen Isotopes Separation installations); 2. - to integrate the national networking into a similar one of European level, and to enhance the scientific significance of Romanian R and D organisations as well as to increase the contribution in solving major issues of the nuclear field. The topics of the round table will be focused on: 1. Development of a Structural Integrity Assessment Methodology applicable to the nuclear facilities components; 2. Experimental investigation methods and procedures; 3. Numeric simulation of nuclear components behaviour; 4. Further activities to finalize the assessment procedure. Also participations and contributions to sustain the activity in the European Network NULIFE, FP6 will be discussed. (authors)

  8. Structural integrity monitoring of critical components in nuclear facilities

    International Nuclear Information System (INIS)

    Roth, Maria; Constantinescu, Dan Mihai; Brad, Sebastian; Ducu, Catalin; Malinovschi, Viorel

    2007-01-01

    Full text: The paper presents the results obtained as part of the Project 'Integrated Network for Structural Integrity Monitoring of Critical Components in Nuclear Facilities', RIMIS, a research work underway within the framework of the Ministry of Education and Research Programme 'Research of Excellence'. The main objective of the Project is to constitute a network integrating the national R and D institutes with preoccupations in the structural integrity assessment of critical components in the nuclear facilities operating in Romania, in order to elaborate a specific procedure for this field. The degradation mechanisms of the structural materials used in the CANDU type reactors, operated by Unit 1 and Unit 2 at Cernavoda (pressure tubes, fuel elements sheaths, steam generator tubing) and in the nuclear facilities relating to reactors of this type as, for instance, the Hydrogen Isotopes Separation facility, will be investigated. The development of a flexible procedure will offer the opportunity to extend the applications to other structural materials used in the nuclear field and in the non-nuclear fields as well, in cooperation with other institutes involved in the developed network. The expected results of the project will allow the integration of the network developed at national level in the structures of similar networks operating within the EU, the enhancement of the scientific importance of Romanian R and D organizations as well as the increase of our country's contribution in solving the major issues of the nuclear field. (authors)

  9. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    The Basis for Design established the functional requirements and design criteria for an Integral Monitored Retrievable Storage (MRS) facility. The MRS Facility design, described in this report, is based on those requirements and includes all infrastructure, facilities, and equipment required to routinely receive, unload, prepare for storage, and store spent fuel (SF), high-level waste (HLW), and transuranic waste (TRU), and to decontaminate and return shipping casks received by both rail and truck. The facility is complete with all supporting facilities to make the MRS Facility a self-sufficient installation

  10. Analysis on working pressure selection of ACME integral test facility

    International Nuclear Information System (INIS)

    Chen Lian; Chang Huajian; Li Yuquan; Ye Zishen; Qin Benke

    2011-01-01

    An integral effects test facility, advanced core cooling mechanism experiment facility (ACME) was designed to verify the performance of the passive safety system and validate its safety analysis codes of a pressurized water reactor power plant. Three test facilities for AP1000 design were introduced and review was given. The problems resulted from the different working pressures of its test facilities were analyzed. Then a detailed description was presented on the working pressure selection of ACME facility as well as its characteristics. And the approach of establishing desired testing initial condition was discussed. The selected 9.3 MPa working pressure covered almost all important passive safety system enables the ACME to simulate the LOCAs with the same pressure and property similitude as the prototype. It's expected that the ACME design would be an advanced core cooling integral test facility design. (authors)

  11. Integrated social facility location planning for decision support: Accessibility studies provide support to facility location and integration of social service provision

    CSIR Research Space (South Africa)

    Green, Cheri A

    2012-09-01

    Full Text Available for two or more facilities to create an integrated plan for development Step 6 Costing of development plan Case Study Access norms and thresholds guidelines in accessibility analysis Appropriate norms/provision guidelines facilitate both service... access norms and threshold standards ?Test the relationship between service demand and the supply (service capacity) of the facility provision points within a defined catchment area ?Promote the ?right?sizing? of facilities relative to the demand...

  12. Monitored retrievable storage (MRS) facility and salt repository integration: Engineering study report

    International Nuclear Information System (INIS)

    1987-07-01

    This MRS Facility and Salt Repository Integration Study evaluates the impacts of an integrated MRS/Salt Repository Waste Management System on the Salt Repository Surface facilities' design, operations, cost, and schedule. Eight separate cases were studied ranging from a two phase repository design with no MRS facility to a design in which the repository only received package waste from the MRS facility for emplacement. The addition of the MRS facility to the Waste Management System significantly reduced the capital cost of the salt repository. All but one of the cases studied were capable of meeting the waste acceptance data. The reduction in the size and complexity of the Salt Repository waste handling building with the integration of the MRS facility reduces the design and operating staff requirements. 7 refs., 35 figs., 43 tabs

  13. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  14. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    One of the problems in the building industry is a limited degree of learning from experiences of use and operation of existing buildings. Development of professional facilities management (FM) can be seen as the missing link to bridge the gap between building operation and building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures...... on literature studies and case studies from the Nordic countries in Europe, including research reflections on experiences from a main case study, where the author, before becoming a university researcher, was engaged in the client organization as deputy project director with responsibility for the integration...

  15. Average combination difference morphological filters for fault feature extraction of bearing

    Science.gov (United States)

    Lv, Jingxiang; Yu, Jianbo

    2018-02-01

    In order to extract impulse components from vibration signals with much noise and harmonics, a new morphological filter called average combination difference morphological filter (ACDIF) is proposed in this paper. ACDIF constructs firstly several new combination difference (CDIF) operators, and then integrates the best two CDIFs as the final morphological filter. This design scheme enables ACIDF to extract positive and negative impacts existing in vibration signals to enhance accuracy of bearing fault diagnosis. The length of structure element (SE) that affects the performance of ACDIF is determined adaptively by a new indicator called Teager energy kurtosis (TEK). TEK further improves the effectiveness of ACDIF for fault feature extraction. Experimental results on the simulation and bearing vibration signals demonstrate that ACDIF can effectively suppress noise and extract periodic impulses from bearing vibration signals.

  16. Evaluation of scaling concepts for integral system test facilities

    International Nuclear Information System (INIS)

    Condie, K.G.; Larson, T.K.; Davis, C.B.

    1987-01-01

    A study was conducted by EG and G Idaho, Inc., to identify and technically evaluate potential concepts which will allow the U.S. Nuclear Regulatory Commission to maintain the capability to conduct future integral, thermal-hydraulic facility experiments of interest to light water reactor safety. This paper summarizes the methodology used in the study and presents a rankings for each facility concept relative to its ability to simulate phenomena identified as important in selected reactor transients in Babcock and Wilcox and Westinghouse large pressurized water reactors. Established scaling methodologies are used to develop potential concepts for scaled integral thermal-hydraulic experiment facilities. Concepts selected included: full height, full pressure water; reduced height, reduced pressure water; reduced height, full pressure water; one-tenth linear, full pressure water; and reduced height, full scaled pressure Freon. Results from this study suggest that a facility capable of operating at typical reactor operating conditions will scale most phenomena reasonably well. Local heat transfer phenomena is best scaled by the full height facility, while the reduced height facilities provide better scaling where multi-dimensional phenomena are considered important. Although many phenomena in facilities using Freon or water at nontypical pressure will scale reasonably well, those phenomena which are heavily dependent on quality can be distorted. Furthermore, relation of data produced in facilities operating with nontypical fluids or at nontypical pressures to large plants will be a difficult and time-consuming process

  17. Design of an integrated non-destructive plutonium assay facility

    International Nuclear Information System (INIS)

    Moore, C.B.

    1984-01-01

    The Department of Energy requires improved technology for nuclear materials accounting as an essential part of new plutonium processing facilities. New facilities are being constructed at the Savannah River Plant by the Du Pont Company, Operating Contractor, to recover plutonium from scrap and waste material generated at SRP and other DOE contract processing facilities. This paper covers design concepts and planning required to incorporate state-of-the-art plutonium assay instruments developed at several national laboratories into an integrated, at-line nuclear material accounting facility operating in the production area. 3 figures

  18. Integrated Human Test Facilities at NASA and the Role of Human Engineering

    Science.gov (United States)

    Tri, Terry O.

    2002-01-01

    Integrated human test facilities are a key component of NASA's Advanced Life Support Program (ALSP). Over the past several years, the ALSP has been developing such facilities to serve as a large-scale advanced life support and habitability test bed capable of supporting long-duration evaluations of integrated bioregenerative life support systems with human test crews. These facilities-targeted for evaluation of hypogravity compatible life support and habitability systems to be developed for use on planetary surfaces-are currently in the development stage at the Johnson Space Center. These major test facilities are comprised of a set of interconnected chambers with a sealed internal environment, which will be outfitted with systems capable of supporting test crews of four individuals for periods exceeding one year. The advanced technology systems to be tested will consist of both biological and physicochemical components and will perform all required crew life support and habitability functions. This presentation provides a description of the proposed test "missions" to be supported by these integrated human test facilities, the overall system architecture of the facilities, the current development status of the facilities, and the role that human design has played in the development of the facilities.

  19. Study on system integration of robots operated in nuclear fusion facility and nuclear power plant facilities

    International Nuclear Information System (INIS)

    Oka, Kiyoshi

    2004-07-01

    A present robot is required to apply to many fields such as amusement, welfare and protection against disasters. The are however only limited numbers of the robots, which can work under the actual conditions as a robot system. It is caused by the following reasons: (1) the robot system cannot be realized by the only collection of the elemental technologies, (2) the performance of the robot is determined by that of the integrated system composed of the complicated elements with many functions, and (3) the respective elements have to be optimized in the integrated robot system with a well balance among them, through their examination, adjustment and improvement. Therefore, the system integration of the robot composed of a large number of elements is the most critical issue to realize the robot system for actual use. In the present paper, I describe the necessary approaches and elemental technologies to solve the issues on the system integration of the typical robot systems for maintenance in the nuclear fusion facility and rescue in the accident of the nuclear power plant facilities. These robots work under the intense radiation condition and restricted space in place of human. In particular, I propose a new approach to realize the system integration of the robot for actual use from the viewpoints of not only the environment and working conditions but also the restructure and optimization of the required elemental technologies with a well balance in the robot system. Based on the above approach, I have a contribution to realize the robot systems working under the actual conditions for maintenance in the nuclear fusion facility and rescue in the accident of the nuclear power plant facilities. (author)

  20. Systems engineering applied to integrated safety management for high consequence facilities

    International Nuclear Information System (INIS)

    Barter, R; Morais, B.

    1998-01-01

    Integrated Safety Management is a concept that is being actively promoted by the U.S. Department of Energy as a means of assuring safe operation of its facilities. The concept involves the integration of safety precepts into work planning rather than adjusting for safe operations after defining the work activity. The system engineering techniques used to design an integrated safety management system for a high consequence research facility are described. An example is given to show how the concepts evolved with the system design

  1. Integrated safeguards and facility design and operations

    International Nuclear Information System (INIS)

    Tape, J.W.; Coulter, C.A.; Markin, J.T.; Thomas, K.E.

    1987-01-01

    The integration of safeguards functions to deter or detect unauthorized actions by an insider requires the careful communication and management of safeguards-relevant information on a timely basis. The traditional separation of safeguards functions into physical protection, materials control, and materials accounting often inhibits important information flows. Redefining the major safeguards functions as authorization, enforcement, and verification, and careful attention to management of information from acquisition to organization, to analysis, to decision making can result in effective safeguards integration. The careful inclusion of these ideas in facility designs and operations will lead to cost-effective safeguards systems. The safeguards authorization function defines, for example, personnel access requirements, processing activities, and materials movements/locations that are permitted to accomplish the mission of the facility. Minimizing the number of authorized personnel, limiting the processing flexibility, and maintaining up-to-date flow sheets will facilitate the detection of unauthorized activities. Enforcement of the authorized activities can be achieved in part through the use of barriers, access control systems, process sensors, and health and safety information. Consideration of safeguards requirements during facility design can improve the enforcement function. Verification includes the familiar materials accounting activities as well as auditing and testing of the other functions

  2. Simulation of natural circulation on an integral type experimental facility, MASLWR

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Youngjong; Lim, Sungwon; Ha, Jaejoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    The OSU MASLWR test facility was reconfigured to eliminate a recurring grounding problem and improve facility reliability in anticipation of conducting an IAEA International Collaborative Standard Problem (ICSP). The purpose of ICSP is to provide experimental data on flow instability phenomena under natural circulation conditions and coupled containment/reactor vessel behavior in integral-type reactors, and to evaluate system code capabilities to predict natural circulation phenomena for integral type PWR, by simulating an integrated experiment. A natural circulation in the primary side during various core powers is analyzed using TASS/SMR code for the integral type experimental facility. The calculation results show higher steady state primary flow than experiment. If it matches the initial flow with experiment, it shows lower primary flow than experiment according to the increase of power. The code predictions may be improved by applying a Reynolds number dependent form loss coefficient to accurately account for unrecoverable pressure losses.

  3. Integrated engineering system for nuclear facilities building

    International Nuclear Information System (INIS)

    Tomura, H.; Miyamoto, A.; Futami, F.; Yasuda, S.; Ohtomo, T.

    1995-01-01

    In the construction of buildings for nuclear facilities in Japan, construction companies are generally in charge of the building engineering work, coordinating with plant engineering. An integrated system for buildings (PROMOTE: PROductive MOdeling system for Total nuclear Engineering) described here is a building engineering system including the entire life cycle of buildings for nuclear facilities. A Three-dimensional (3D) building model (PRO-model) is to be in the core of the system (PROMOTE). Data sharing in the PROMOTE is also done with plant engineering systems. By providing these basic technical foundations, PROMOTE is oriented toward offering rational, highquality engineering for the projects. The aim of the system is to provide a technical foundation in building engineering. This paper discusses the characteristics of buildings for nuclear facilities and the outline of the PROMOTE. (author)

  4. Australian national networked tele-test facility for integrated systems

    Science.gov (United States)

    Eshraghian, Kamran; Lachowicz, Stefan W.; Eshraghian, Sholeh

    2001-11-01

    The Australian Commonwealth government recently announced a grant of 4.75 million as part of a 13.5 million program to establish a world class networked IC tele-test facility in Australia. The facility will be based on a state-of-the-art semiconductor tester located at Edith Cowan University in Perth that will operate as a virtual centre spanning Australia. Satellite nodes will be located at the University of Western Australia, Griffith University, Macquarie University, Victoria University and the University of Adelaide. The facility will provide vital equipment to take Australia to the frontier of critically important and expanding fields in microelectronics research and development. The tele-test network will provide state of the art environment for the electronics and microelectronics research and the industry community around Australia to test and prototype Very Large Scale Integrated (VLSI) circuits and other System On a Chip (SOC) devices, prior to moving to the manufacturing stage. Such testing is absolutely essential to ensure that the device performs to specification. This paper presents the current context in which the testing facility is being established, the methodologies behind the integration of design and test strategies and the target shape of the tele-testing Facility.

  5. Integrated biofuel facility, with carbon dioxide consumption and power generation

    Energy Technology Data Exchange (ETDEWEB)

    Powell, E.E.; Hill, G.A. [Saskatchewan Univ., Saskatoon, SK (Canada). Dept. of Chemical Engineering

    2009-07-01

    This presentation provided details of an economical design for a large-scale integrated biofuel facility for coupled production of bioethanol and biodiesel, with carbon dioxide capture and power generation. Several designs were suggested for both batch and continuous culture operations, taking into account all costs and revenues associated with the complete plant integration. The microalgae species Chlorella vulgaris was cultivated in a novel photobioreactor (PBR) in order to consume industrial carbon dioxide (CO{sub 2}). This photosynthetic culture can also act as a biocathode in a microbial fuel cell (MFC), which when coupled to a typical yeast anodic half cell, results in a complete biological MFC. The photosynthetic MFC produces electricity as well as valuable biomass and by-products. The use of this novel photosynthetic microalgae cathodic half cell in an integrated biofuel facility was discussed. A series of novel PBRs for continuous operation can be integrated into a large-scale bioethanol facility, where the PBRs serve as cathodic half cells and are coupled to the existing yeast fermentation tanks which act as anodic half cells. These coupled MFCs generate electricity for use within the biofuel facility. The microalgae growth provides oil for biodiesel production, in addition to the bioethanol from the yeast fermentation. The photosynthetic cultivation in the cathodic PBR also requires carbon dioxide, resulting in consumption of carbon dioxide from bioethanol production. The paper also discussed the effect of plant design on net present worth and internal rate of return. tabs., figs.

  6. MIMI: multimodality, multiresource, information integration environment for biomedical core facilities.

    Science.gov (United States)

    Szymanski, Jacek; Wilson, David L; Zhang, Guo-Qiang

    2009-10-01

    The rapid expansion of biomedical research has brought substantial scientific and administrative data management challenges to modern core facilities. Scientifically, a core facility must be able to manage experimental workflow and the corresponding set of large and complex scientific data. It must also disseminate experimental data to relevant researchers in a secure and expedient manner that facilitates collaboration and provides support for data interpretation and analysis. Administratively, a core facility must be able to manage the scheduling of its equipment and to maintain a flexible and effective billing system to track material, resource, and personnel costs and charge for services to sustain its operation. It must also have the ability to regularly monitor the usage and performance of its equipment and to provide summary statistics on resources spent on different categories of research. To address these informatics challenges, we introduce a comprehensive system called MIMI (multimodality, multiresource, information integration environment) that integrates the administrative and scientific support of a core facility into a single web-based environment. We report the design, development, and deployment experience of a baseline MIMI system at an imaging core facility and discuss the general applicability of such a system in other types of core facilities. These initial results suggest that MIMI will be a unique, cost-effective approach to addressing the informatics infrastructure needs of core facilities and similar research laboratories.

  7. Strategic interaction among hospitals and nursing facilities: the efficiency effects of payment systems and vertical integration.

    Science.gov (United States)

    Banks, D; Parker, E; Wendel, J

    2001-03-01

    Rising post-acute care expenditures for Medicare transfer patients and increasing vertical integration between hospitals and nursing facilities raise questions about the links between payment system structure, the incentive for vertical integration and the impact on efficiency. In the United States, policy-makers are responding to these concerns by initiating prospective payments to nursing facilities, and are exploring the bundling of payments to hospitals. This paper develops a static profit-maximization model of the strategic interaction between the transferring hospital and a receiving nursing facility. This model suggests that the post-1984 system of prospective payment for hospital care, coupled with nursing facility payments that reimburse for services performed, induces inefficient under-provision of hospital services and encourages vertical integration. It further indicates that the extension of prospective payment to nursing facilities will not eliminate the incentive to vertically integrate, and will not result in efficient production unless such integration takes place. Bundling prospective payments for hospitals and nursing facilities will neither remove the incentive for vertical integration nor induce production efficiency without such vertical integration. However, bundled payment will induce efficient production, with or without vertical integration, if nursing facilities are reimbursed for services performed. Copyright 2001 John Wiley & Sons, Ltd.

  8. Criticality safety considerations. Integral Monitored Retrievable Storage (MRS) Facility

    International Nuclear Information System (INIS)

    1986-09-01

    This report summarizes the criticality analysis performed to address criticality safety concerns and to support facility design during the conceptual design phase of the Monitored Retrievable Storage (MRS) Facility. The report addresses the criticality safety concerns, the design features of the facility relative to criticality, and the results of the analysis of both normal operating and hypothetical off-normal conditions. Key references are provided (Appendix C) if additional information is desired by the reader. The MRS Facility design was developed and the related analysis was performed in accordance with the MRS Facility Functional Design Criteria and the Basis for Design. The detailed description and calculations are documented in the Integral MRS Facility Conceptual Design Report. In addition to the summary portion of this report, explanatary notes for various terms, calculation methodology, and design parameters are presented in Appendix A. Appendix B provides a brief glossary of technical terms

  9. The Origin and Constitution of Facilities Management as an integrated corporate fuction

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2008-01-01

    Purpose – To understand how facilities management (FM) has evolved over time in a complex public corporation from internal functions of building operation and building client and the related service functions to become an integrated corporate function. Design/methodology/approach – The paper...... is based on results from a research project on space strategies and building values, which included a major longitudinal case study of the development of facilities for the Danish Broadcasting Corporation (DR) over time. The research presented here included literature studies, archive studies...... and a fully integrated corporate Facilities Management function are established. Research limitations/implications – The paper presents empirical evidence of the historical development ofFMfrom one case and provides a deeper understanding of the integration processes that are crucial to FM and which can...

  10. PANDA: A Multipurpose Integral Test Facility for LWR Safety Investigations

    International Nuclear Information System (INIS)

    Paladino, D.; Dreier, J.

    2012-01-01

    The PANDA facility is a large scale, multicompartmental thermal hydraulic facility suited for investigations related to the safety of current and advanced LWRs. The facility is multipurpose, and the applications cover integral containment response tests, component tests, primary system tests, and separate effect tests. Experimental investigations carried on in the PANDA facility have been embedded in international projects, most of which under the auspices of the EU and OECD and with the support of a large number of organizations (regulatory bodies, technical dupport organizations, national laboratories, electric utilities, industries) worldwide. The paper provides an overview of the research programs performed in the PANDA facility in relation to BWR containment systems and those planned for PWR containment systems.

  11. Assessing the economic feasibility of flexible integrated gasification Co-generation facilities

    NARCIS (Netherlands)

    Meerman, J.C.; Ramírez Ramírez, C.A.; Turkenburg, W.C.; Faaij, A.P.C.

    2011-01-01

    This paper evaluated the economic effects of introducing flexibility to state-of-the-art integrated gasification co-generation (IGCG) facilities equipped with CO2 capture. In a previous paper the technical and energetic performances of these flexible IG-CG facilities were evaluated. This paper

  12. ICAT: Integrating data infrastructure for facilities based science

    International Nuclear Information System (INIS)

    Flannery, Damian; Matthews, Brian; Griffin, Tom; Bicarregui, Juan; Gleaves, Michael; Lerusse, Laurent; Downing, Roger; Ashton, Alun; Sufi, Shoaib; Drinkwater, Glen; Kleese van Dam, Kerstin

    2009-01-01

    ICAT: Integrating data infrastructure for facilities based science Damian Flannery, Brian Matthews, Tom Griffin, Juan Bicarregui, Michael Gleaves, Laurent Lerusse, Roger Downing, Alun Ashton, Shoaib Sufi, Glen Drinkwater, Kerstin Kleese Abstract Scientific facilities, in particular large-scale photon and neutron sources, have demanding requirements to manage the increasing quantities of experimental data they generate in a systematic and secure way. In this paper, we describe the ICAT infrastructure for cataloguing facility generated experimental data which has been in development within STFC and DLS for several years. We consider the factors which have influenced its design and describe its architecture and metadata model, a key tool in the management of data. We go on to give an outline of its current implementation and use, with plans for its future development.

  13. Westinghouse integrated cementation facility. Smart process automation minimizing secondary waste

    International Nuclear Information System (INIS)

    Fehrmann, H.; Jacobs, T.; Aign, J.

    2015-01-01

    The Westinghouse Cementation Facility described in this paper is an example for a typical standardized turnkey project in the area of waste management. The facility is able to handle NPP waste such as evaporator concentrates, spent resins and filter cartridges. The facility scope covers all equipment required for a fully integrated system including all required auxiliary equipment for hydraulic, pneumatic and electric control system. The control system is based on actual PLC technology and the process is highly automated. The equipment is designed to be remotely operated, under radiation exposure conditions. 4 cementation facilities have been built for new CPR-1000 nuclear power stations in China

  14. Different ketogenesis strategies lead to disparate seizure outcomes.

    Science.gov (United States)

    Dolce, Alison; Santos, Polan; Chen, Weiran; Hoke, Ahmet; Hartman, Adam L

    2018-07-01

    Despite the introduction of new medicines to treat epilepsy over the last 50 years, the number of patients with poorly-controlled seizures remains unchanged. Metabolism-based therapies are an underutilized treatment option for this population. We hypothesized that two different means of systemic ketosis, the ketogenic diet and intermittent fasting, would differ in their acute seizure test profiles and mitochondrial respiration. Male NIH Swiss mice (aged 3-4 weeks) were fed for 12-13 days using one of four diet regimens: ketogenic diet (KD), control diet matched to KD for protein content and micronutrients (CD), or CD with intermittent fasting (24 h feed/24 h fast) (CD-IF), tested post-feed or post-fast. Mice were subject to the 6 Hz threshold test or, in separate cohorts, after injection of kainic acid in doses based on their weight (Cohort I) or a uniform dose regardless of weight (Cohort II). Mitochondrial respiration was tested in brain tissue isolated from similarly-fed seizure-naïve mice. KD mice were protected against 6 Hz-induced seizures but had more severe seizure scores in the kainic acid test (Cohorts I & II), the opposite of CD-IF mice. No differences were noted in mitochondrial respiration between diet regimens. KD and CD-IF do not share identical antiseizure mechanisms. These differences were not explained by differences in mitochondrial respiration. Nevertheless, both KD and CD-IF regimens protected against different types of seizures, suggesting that mechanisms underlying CD-IF seizure protection should be explored further. Published by Elsevier B.V.

  15. Integrated Electrical and Thermal Grid Facility - Testing of Future Microgrid Technologies

    Directory of Open Access Journals (Sweden)

    Sundar Raj Thangavelu

    2015-09-01

    Full Text Available This paper describes the Experimental Power Grid Centre (EPGC microgrid test facility, which was developed to enable research, development and testing for a wide range of distributed generation and microgrid technologies. The EPGC microgrid facility comprises a integrated electrical and thermal grid with a flexible and configurable architecture, and includes various distributed energy resources and emulators, such as generators, renewable, energy storage technologies and programmable load banks. The integrated thermal grid provides an opportunity to harness waste heat produced by the generators for combined heat, power and cooling applications, and support research in optimization of combined electrical-thermal systems. Several case studies are presented to demonstrate the testing of different control and operation strategies for storage systems in grid-connected and islanded microgrids. One of the case studies also demonstrates an integrated thermal grid to convert waste heat to useful energy, which thus far resulted in a higher combined energy efficiency. Experiment results confirm that the facility enables testing and evaluation of grid technologies and practical problems that may not be apparent in a computer simulated environment.

  16. BWR Full Integral Simulation Test (FIST) program: facility description report

    International Nuclear Information System (INIS)

    Stephens, A.G.

    1984-09-01

    A new boiling water reactor safety test facility (FIST, Full Integral Simulation Test) is described. It will be used to investigate small breaks and operational transients and to tie results from such tests to earlier large-break test results determined in the TLTA. The new facility's full height and prototypical components constitute a major scaling improvement over earlier test facilities. A heated feedwater system, permitting steady-state operation, and a large increase in the number of measurements are other significant improvements. The program background is outlined and program objectives defined. The design basis is presented together with a detailed, complete description of the facility and measurements to be made. An extensive component scaling analysis and prediction of performance are presented

  17. An integrated approach for facilities planning by ELECTRE method

    Science.gov (United States)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with

  18. Carbon dioxide neutral, integrated biofuel facility

    Energy Technology Data Exchange (ETDEWEB)

    Powell, E.E.; Hill, G.A. [Department of Chemical Engineering, University of Saskatchewan, 57 Campus Drive, Saskatoon, Saskatchewan, S7N 5A9 (Canada)

    2010-12-15

    Algae are efficient biocatalysts for both capture and conversion of carbon dioxide in the environment. In earlier work, we have optimized the ability of Chlorella vulgaris to rapidly capture CO{sub 2} from man-made emission sources by varying environmental growth conditions and bioreactor design. Here we demonstrate that a coupled biodiesel-bioethanol facility, using yeast to produce ethanol and photosynthetic algae to produce biodiesel, can result in an integrated, economical, large-scale process for biofuel production. Each bioreactor acts as an electrode for a coupled complete microbial fuel cell system; the integrated cultures produce electricity that is consumed as an energy source within the process. Finally, both the produced yeast and spent algae biomass can be used as added value byproducts in the feed or food industries. Using cost and revenue estimations, an IRR of up to 25% is calculated using a 5 year project lifespan. (author)

  19. Integrated Payment And Delivery Models Offer Opportunities And Challenges For Residential Care Facilities.

    Science.gov (United States)

    Grabowski, David C; Caudry, Daryl J; Dean, Katie M; Stevenson, David G

    2015-10-01

    Under health care reform, new financing and delivery models are being piloted to integrate health and long-term care services for older adults. Programs using these models generally have not included residential care facilities. Instead, most of them have focused on long-term care recipients in the community or the nursing home. Our analyses indicate that individuals living in residential care facilities have similarly high rates of chronic illness and Medicare utilization when compared with matched individuals in the community and nursing home, and rates of functional dependency that fall between those of their counterparts in the other two settings. These results suggest that the residential care facility population could benefit greatly from models that coordinated health and long-term care services. However, few providers have invested in the infrastructure needed to support integrated delivery models. Challenges to greater care integration include the private-pay basis for residential care facility services, which precludes shared savings from reduced Medicare costs, and residents' preference for living in a home-like, noninstitutional environment. Project HOPE—The People-to-People Health Foundation, Inc.

  20. A Supply Chain Design Problem Integrated Facility Unavailabilities Management

    Directory of Open Access Journals (Sweden)

    Fouad Maliki

    2016-08-01

    Full Text Available A supply chain is a set of facilities connected together in order to provide products to customers. The supply chain is subject to random failures caused by different factors which cause the unavailability of some sites. Given the current economic context, the management of these unavailabilities is becoming a strategic choice to ensure the desired reliability and availability levels of the different supply chain facilities. In this work, we treat two problems related to the field of supply chain, namely the design and unavailabilities management of logistics facilities. Specifically, we consider a stochastic distribution network with consideration of suppliers' selection, distribution centres location (DCs decisions and DCs’ unavailabilities management. Two resolution approaches are proposed. The first approach called non-integrated consists on define the optimal supply chain structure using an optimization approach based on genetic algorithms (GA, then to simulate the supply chain performance with the presence of DCs failures. The second approach called integrated approach is to consider the design of the supply chain problem and unavailabilities management of DCs in the same model. Note that, we replace each unavailable DC by performing a reallocation using GA in the two approaches. The obtained results of the two approaches are detailed and compared showing their effectiveness.

  1. Integral Monitored Retrievable Storage (MRS) Facility conceptual basis for design

    International Nuclear Information System (INIS)

    1985-10-01

    The purpose of the Conceptual Basis for Design is to provide a control document that establishes the basis for executing the conceptual design of the Integral Monitored Retrievable Storage (MRS) Facility. This conceptual design shall provide the basis for preparation of a proposal to Congress by the Department of Energy (DOE) for construction of one or more MRS Facilities for storage of spent nuclear fuel, high-level radioactive waste, and transuranic (TRU) waste. 4 figs., 25 tabs

  2. Passive BWR integral LOCA testing at the Karlstein test facility INKA

    Energy Technology Data Exchange (ETDEWEB)

    Drescher, Robert [AREVA GmbH, Erlangen (Germany); Wagner, Thomas [AREVA GmbH, Karlstein am Main (Germany); Leyer, Stephan [TH University of Applied Sciences, Deggendorf (Germany)

    2014-05-15

    KERENA is an innovative AREVA GmbH boiling water reactor (BWR) with passive safety systems (Generation III+). In order to verify the functionality of the reactor design an experimental validation program was executed. Therefore the INKA (Integral Teststand Karlstein) test facility was designed and erected. It is a mockup of the BWR containment, with integrated pressure suppression system. While the scaling of the passive components and the levels match the original values, the volume scaling of the containment compartments is approximately 1:24. The storage capacity of the test facility pressure vessel corresponds to approximately 1/6 of the KERENA RPV and is supplied by a benson boiler with a thermal power of 22 MW. In March 2013 the first integral test - Main Steam Line Break (MSLB) - was executed. The test measured the combined response of the passive safety systems to the postulated initiating event. The main goal was to demonstrate the ability of the passive systems to ensure core coverage, decay heat removal and to maintain the containment within defined limits. The results of the test showed that the passive safety systems are capable to bring the plant to stable conditions meeting all required safety targets with sufficient margins. Therefore the test verified the function of those components and the interplay between them. The test proved that INKA is an unique test facility, capable to perform integral tests of passive safety concepts under plant-like conditions. (orig.)

  3. Annual Summary of the Integrated Disposal Facility Performance Assessment 2012

    Energy Technology Data Exchange (ETDEWEB)

    Khaleel, R. [INTERA, Austin, TX (United States); Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-12-27

    An annual summary of the adequacy of the Hanford Immobilized Low-Activity Waste (ILAW) Performance Assessment (PA) is required each year (DOE O 435.1 Chg 1,1 DOE M 435.1-1 Chg 1;2 and DOE/ORP-2000-013). The most recently approved PA is DOE/ORP-2000-24.4 The ILAW PA evaluated the adequacy of the ILAW disposal facility, now referred to as the Integrated Disposal Facility (IDF), for the safe disposal of vitrified Hanford Site tank waste.

  4. A description of the demonstration Integral Fast Reactor fuel cycle facility

    International Nuclear Information System (INIS)

    Courtney, J.C.; Carnes, M.D.; Dwight, C.C.; Forrester, R.J.

    1991-01-01

    A fuel examination facility at the Idaho National Engineering Laboratory is being converted into a facility that will electrochemically process spent fuel. This is an important step in the demonstration of the Integral Fast Reactor concept being developed by Argonne National Laboratory. Renovations are designed to bring the facility up to current health and safety and environmental standards and to support its new mission. Improvements include the addition of high-reliability earthquake hardened off-gas and electrical power systems, the upgrading of radiological instrumentation, and the incorporation of advances in contamination control. A major task is the construction of a new equipment repair and decontamination facility in the basement of the building to support operations

  5. Design of integrated safeguards systems for nuclear facilities

    International Nuclear Information System (INIS)

    de Montmollin, J.M.; Walton, R.B.

    1976-01-01

    Safeguards systems that are capable of countering postulated threats to nuclear facilities must be closely integrated with plant layout and processes if they are to be effective and if potentially severe impacts on plant operations are to be averted. A facilities safeguards system suitable for a production plant is described in which the traditional elements of physical protection and periodic material-balance accounting are extended and augmented to provide close control of material flows. Discrete material items are subjected to direct, overriding physical control where appropriate. Materials in closely coupled process streams are protected by on-line NDA and weight measurements, with rapid computation of material balances to provide immediate indication of large-scale diversion. The system provides an information and actions at the safeguards/operations interface

  6. Design of integrated safeguards systems for nuclear facilities

    International Nuclear Information System (INIS)

    de Montmollin, J.M.; Walton, R.B.

    1978-06-01

    Safeguards systems that are capable of countering postulated threats to nuclear facilities must be closely integrated with plant layout and processes if they are to be effective and if potentially-severe impacts on plant operations are to be averted. This paper describes a facilities safeguards system suitable for production plant, in which the traditional elements of physical protection and periodic material-balance accounting are extended and augmented to provide close control of material flows. Discrete material items are subjected to direct, overriding physical control where appropriate. Materials in closely-coupled process streams are protected by on-line NDA and weight measurements, with rapid computation of material balances to provide immediate indication of large-scale diversion. The system provides information and actions at the safeguards/operations interface

  7. Integrated Framework for Patient Safety and Energy Efficiency in Healthcare Facilities Retrofit Projects.

    Science.gov (United States)

    Mohammadpour, Atefeh; Anumba, Chimay J; Messner, John I

    2016-07-01

    There is a growing focus on enhancing energy efficiency in healthcare facilities, many of which are decades old. Since replacement of all aging healthcare facilities is not economically feasible, the retrofitting of these facilities is an appropriate path, which also provides an opportunity to incorporate energy efficiency measures. In undertaking energy efficiency retrofits, it is vital that the safety of the patients in these facilities is maintained or enhanced. However, the interactions between patient safety and energy efficiency have not been adequately addressed to realize the full benefits of retrofitting healthcare facilities. To address this, an innovative integrated framework, the Patient Safety and Energy Efficiency (PATSiE) framework, was developed to simultaneously enhance patient safety and energy efficiency. The framework includes a step -: by -: step procedure for enhancing both patient safety and energy efficiency. It provides a structured overview of the different stages involved in retrofitting healthcare facilities and improves understanding of the intricacies associated with integrating patient safety improvements with energy efficiency enhancements. Evaluation of the PATSiE framework was conducted through focus groups with the key stakeholders in two case study healthcare facilities. The feedback from these stakeholders was generally positive, as they considered the framework useful and applicable to retrofit projects in the healthcare industry. © The Author(s) 2016.

  8. Supporting Facility Management Processes through End-Users’ Integration and Coordinated BIM-GIS Technologies

    Directory of Open Access Journals (Sweden)

    Claudio Mirarchi

    2018-05-01

    Full Text Available The integration of facility management and building information modelling (BIM is an innovative and critical undertaking process to support facility maintenance and management. Even though recent research has proposed various methods and performed an increasing number of case studies, there are still issues of communication processes to be addressed. This paper presents a theoretical framework for digital systems integration of virtual models and smart technologies. Based on the comprehensive analysis of existing technologies for indoor localization, a new workflow is defined and designed, and it is utilized in a practical case study to test the model performance. In the new workflow, a facility management supporting platform is proposed and characterized, featuring indoor positioning systems to allow end users to send geo-referenced reports to central virtual models. In addition, system requirements, information technology (IT architecture and application procedures are presented. Results show that the integration of end users in the maintenance processes through smart and easy tools can overcome the existing limits of barcode systems and building management systems for failure localization. The proposed framework offers several advantages. First, it allows the identification of every element of an asset including wide physical building elements (walls, floors, etc. without requiring a prior mapping. Second, the entire cycle of maintenance activities is managed through a unique integrated system including the territorial dimension. Third, data are collected in a standard structure for future uses. Furthermore, the integration of the process in a centralized BIM-GIS (geographical information system information management system admit a scalable representation of the information supporting facility management processes in terms of assets and supply chain management and monitoring from a spatial perspective.

  9. The Mixed Waste Management Facility. Design basis integrated operations plan (Title I design)

    International Nuclear Information System (INIS)

    1994-12-01

    The Mixed Waste Management Facility (MWMF) will be a fully integrated, pilotscale facility for the demonstration of low-level, organic-matrix mixed waste treatment technologies. It will provide the bridge from bench-scale demonstrated technologies to the deployment and operation of full-scale treatment facilities. The MWMF is a key element in reducing the risk in deployment of effective and environmentally acceptable treatment processes for organic mixed-waste streams. The MWMF will provide the engineering test data, formal evaluation, and operating experience that will be required for these demonstration systems to become accepted by EPA and deployable in waste treatment facilities. The deployment will also demonstrate how to approach the permitting process with the regulatory agencies and how to operate and maintain the processes in a safe manner. This document describes, at a high level, how the facility will be designed and operated to achieve this mission. It frequently refers the reader to additional documentation that provides more detail in specific areas. Effective evaluation of a technology consists of a variety of informal and formal demonstrations involving individual technology systems or subsystems, integrated technology system combinations, or complete integrated treatment trains. Informal demonstrations will typically be used to gather general operating information and to establish a basis for development of formal demonstration plans. Formal demonstrations consist of a specific series of tests that are used to rigorously demonstrate the operation or performance of a specific system configuration

  10. Engineering Task Plan for the Integrity Assessment Examination of Double-Contained Receiver Tanks (DCRT), Catch Tanks and Ancillary facilities

    International Nuclear Information System (INIS)

    BECKER, D.L.

    2000-01-01

    This Engineering Task Plan (ETP) presents the integrity assessment examination of three DCRTs, seven catch tanks, and two ancillary facilities located in the 200 East and West Areas of the Hanford Site. The integrity assessment examinations, as described in this ETP, will provide the necessary information to enable the independently qualified registered professional engineer (IQRPE) to assess the condition and integrity of these facilities. The plan is consistent with the Double-Shell Tank Waste Transfer Facilities Integrity Assessment Plan

  11. Heterogeneous Electronics – Wafer Level Integration, Packaging, and Assembly Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility integrates active electronics with microelectromechanical (MEMS) devices at the miniature system scale. It obviates current size-, weight-, and power...

  12. Long term integrity of spent fuel and construction materials for dry storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Saegusa, T [CRIEPI (Japan)

    2012-07-01

    In Japan, two dry storage facilities at reactor sites have already been operating since 1995 and 2002, respectively. Additionally, a large scale dry storage facility away from reactor sites is under safety examination for license near the coast and desired to start its operation in 2010. Its final storage capacity is 5,000tU. It is therefore necessary to obtain and evaluate the related data on integrity of spent fuels loaded into and construction materials of casks during long term dry storage. The objectives are: - Spent fuel rod: To evaluate hydrogen migration along axial fuel direction on irradiated claddings stored for twenty years in air; To evaluate pellet oxidation behaviour for high burn-up UO{sub 2} fuels; - Construction materials for dry storage facilities: To evaluate long term reliability of welded stainless steel canister under stress corrosion cracking (SCC) environment; To evaluate long term integrity of concrete cask under carbonation and salt attack environment; To evaluate integrity of sealability of metal gasket under long term storage and short term accidental impact force.

  13. Performance of simulated flexible integrated gasification polygeneration facilities. Part A: A technical-energetic assessment

    NARCIS (Netherlands)

    Meerman, J.C.; Ramírez Ramírez, C.A.; Turkenburg, W.C.; Faaij, A.P.C.

    2011-01-01

    This article investigates technical possibilities and performances of flexible integrated gasification polygeneration (IG-PG) facilities equipped with CO2 capture for the near future. These facilities can produce electricity during peak hours, while switching to the production of chemicals during

  14. Solder bond requirement for large, built-up, high-performance conductors

    International Nuclear Information System (INIS)

    Willig, R.L.

    1981-01-01

    Some large built-up conductors fabricated for large superconducting magnets are designed to operate above the maximum recovery current. Because the stability of these conductors is sensitive to the quality of the solder bond joining the composite superconductor to the high-conductivity substrate, a minimum bond requirement is necessary. The present analysis finds that the superconductor is unstable and becomes abruptly resistive when there are temperature excursions into the current sharing region of a poorly bonded conductor. This abrupt transition, produces eddy current heating in the vicinity of the superconducting filaments and causes a sharp reduction in the minimum propagating zone (MPZ) energy. This sensitivity of the MPZ energy to the solder bond contact area is used to specify a minimum bond requirement. For the superconducting MHD magnet built for the Component Development Integration Facility (CDIF), the minimum bonded surface area is .68 cm/sup 2//cm which is 44% of the composite perimeter. 5 refs

  15. Introduction to Large-sized Test Facility for validating Containment Integrity under Severe Accidents

    International Nuclear Information System (INIS)

    Na, Young Su; Hong, Seongwan; Hong, Seongho; Min, Beongtae

    2014-01-01

    An overall assessment of containment integrity can be conducted properly by examining the hydrogen behavior in the containment building. Under severe accidents, an amount of hydrogen gases can be generated by metal oxidation and corium-concrete interaction. Hydrogen behavior in the containment building strongly depends on complicated thermal hydraulic conditions with mixed gases and steam. The performance of a PAR can be directly affected by the thermal hydraulic conditions, steam contents, gas mixture behavior and aerosol characteristics, as well as the operation of other engineering safety systems such as a spray. The models in computer codes for a severe accident assessment can be validated based on the experiment results in a large-sized test facility. The Korea Atomic Energy Research Institute (KAERI) is now preparing a large-sized test facility to examine in detail the safety issues related with hydrogen including the performance of safety devices such as a PAR in various severe accident situations. This paper introduces the KAERI test facility for validating the containment integrity under severe accidents. To validate the containment integrity, a large-sized test facility is necessary for simulating complicated phenomena induced by an amount of steam and gases, especially hydrogen released into the containment building under severe accidents. A pressure vessel 9.5 m in height and 3.4 m in diameter was designed at the KAERI test facility for the validating containment integrity, which was based on the THAI test facility with the experimental safety and the reliable measurement systems certified for a long time. This large-sized pressure vessel operated in steam and iodine as a corrosive agent was made by stainless steel 316L because of corrosion resistance for a long operating time, and a vessel was installed in at KAERI in March 2014. In the future, the control systems for temperature and pressure in a vessel will be constructed, and the measurement system

  16. A Study of Critical Flowrate in the Integral Effect Test Facilities

    International Nuclear Information System (INIS)

    Kim, Yeongsik; Ryu, Sunguk; Cho, Seok; Yi, Sungjae; Park, Hyunsik

    2014-01-01

    In earlier studies, most of the information available in the literature was either for a saturated two-phase flow or a sub-cooled water flow at medium pressure conditions, e. g., up to about 7.0 MPa. The choking is regarded as a condition of maximum possible discharge through a given orifice and/or nozzle exit area. A critical flow rate can be achieved at a choking under the given thermo-hydraulic conditions. The critical flow phenomena were studied extensively in both single-phase and two-phase systems because of its importance in the LOCA analyses of light water reactors and in the design of other engineering areas. Park suggested a modified correlation for predicting the critical flow for sub-cooled water through a nozzle. Recently, Park et al. performed an experimental study on a two-phase critical flow with a noncondensable gas at high pressure conditions. Various experiments of critical flow using sub-cooled water were performed for a modeling of break simulators in thermohydraulic integral effect test facilities for light water reactors, e. g., an advanced power reactor 1400MWe (APR1400) and a system-integrated modular advanced reactor (SMART). For the design of break simulators of SBLOCA scenarios, the aspect ratio (L/D) is considered to be a key parameter to determine the shape of a break simulator. In this paper, an investigation of critical flow phenomena was performed especially on break simulators for LOCA scenarios in the integral effect test facilities of KAERI, such as ATLAS and FESTA. In this study, various studies on the critical flow models for sub-cooled and/or saturated water were reviewed. For a comparison among the models for the selected test data, discussions of the comparisons on the effect of the diameters, predictions of critical flow models, and break simulators for SBLOCA in the integral effect test facilities were presented

  17. A Study of Critical Flowrate in the Integral Effect Test Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yeongsik; Ryu, Sunguk; Cho, Seok; Yi, Sungjae; Park, Hyunsik [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    In earlier studies, most of the information available in the literature was either for a saturated two-phase flow or a sub-cooled water flow at medium pressure conditions, e. g., up to about 7.0 MPa. The choking is regarded as a condition of maximum possible discharge through a given orifice and/or nozzle exit area. A critical flow rate can be achieved at a choking under the given thermo-hydraulic conditions. The critical flow phenomena were studied extensively in both single-phase and two-phase systems because of its importance in the LOCA analyses of light water reactors and in the design of other engineering areas. Park suggested a modified correlation for predicting the critical flow for sub-cooled water through a nozzle. Recently, Park et al. performed an experimental study on a two-phase critical flow with a noncondensable gas at high pressure conditions. Various experiments of critical flow using sub-cooled water were performed for a modeling of break simulators in thermohydraulic integral effect test facilities for light water reactors, e. g., an advanced power reactor 1400MWe (APR1400) and a system-integrated modular advanced reactor (SMART). For the design of break simulators of SBLOCA scenarios, the aspect ratio (L/D) is considered to be a key parameter to determine the shape of a break simulator. In this paper, an investigation of critical flow phenomena was performed especially on break simulators for LOCA scenarios in the integral effect test facilities of KAERI, such as ATLAS and FESTA. In this study, various studies on the critical flow models for sub-cooled and/or saturated water were reviewed. For a comparison among the models for the selected test data, discussions of the comparisons on the effect of the diameters, predictions of critical flow models, and break simulators for SBLOCA in the integral effect test facilities were presented.

  18. An Integrated Assessment of Location-Dependent Scaling for Microalgae Biofuel Production Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Andre M.; Abodeely, Jared; Skaggs, Richard; Moeglein, William AM; Newby, Deborah T.; Venteris, Erik R.; Wigmosta, Mark S.

    2014-06-19

    Successful development of a large-scale microalgae-based biofuels industry requires comprehensive analysis and understanding of the feedstock supply chain—from facility siting/design through processing/upgrading of the feedstock to a fuel product. The evolution from pilot-scale production facilities to energy-scale operations presents many multi-disciplinary challenges, including a sustainable supply of water and nutrients, operational and infrastructure logistics, and economic competitiveness with petroleum-based fuels. These challenges are addressed in part by applying the Integrated Assessment Framework (IAF)—an integrated multi-scale modeling, analysis, and data management suite—to address key issues in developing and operating an open-pond facility by analyzing how variability and uncertainty in space and time affect algal feedstock production rates, and determining the site-specific “optimum” facility scale to minimize capital and operational expenses. This approach explicitly and systematically assesses the interdependence of biofuel production potential, associated resource requirements, and production system design trade-offs. The IAF was applied to a set of sites previously identified as having the potential to cumulatively produce 5 billion-gallons/year in the southeastern U.S. and results indicate costs can be reduced by selecting the most effective processing technology pathway and scaling downstream processing capabilities to fit site-specific growing conditions, available resources, and algal strains.

  19. Global nuclear material monitoring with NDA and C/S data through integrated facility monitoring

    International Nuclear Information System (INIS)

    Howell, J.A.; Menlove, H.O.; Argo, P.; Goulding, C.; Klosterbuer, S.; Halbig, J.

    1996-01-01

    This paper focuses on a flexible, integrated demonstration of a monitoring approach for nuclear material monitoring. This includes aspects of item signature identification, perimeter portal monitoring, advanced data analysis, and communication as a part of an unattended continuous monitoring system in an operating nuclear facility. Advanced analysis is applied to the integrated nondestructive assay and containment and surveillance data that are synchronized in time. End result will be the foundation for a cost-effective monitoring system that could provide the necessary transparency even in areas that are denied to foreign nationals of both US and Russia should these processes and materials come under full-scope safeguards or bilateral agreements. Monitoring systems of this kind have the potential to provide additional benefits including improved nuclear facility security and safeguards and lower personnel radiation exposures. Demonstration facilities in this paper include VTRAP-prototype, Los Alamos Critical Assemblies Facility, Kazakhstan BM-350 Reactor monitor, DUPIC radiation monitoring, and JOYO and MONJU radiation monitoring

  20. Conceptual design of a fission-based integrated test facility for fusion reactor components

    International Nuclear Information System (INIS)

    Watts, K.D.; Deis, G.A.; Hsu, P.Y.S.; Longhurst, G.R.; Masson, L.S.; Miller, L.G.

    1982-01-01

    The testing of fusion materials and components in fission reactors will become increasingly important because of lack of fusion engineering test devices in the immediate future and the increasing long-term demand for fusion testing when a fusion reactor test station becomes available. This paper presents the conceptual design of a fission-based Integrated Test Facility (ITF) developed by EG and G Idaho. This facility can accommodate entire first wall/blanket (FW/B) test modules such as those proposed for INTOR and can also accommodate smaller cylindrical modules similar to those designed by Oak Ridge National laboratory (ORNL) and Westinghouse. In addition, the facility can be used to test bulk breeder blanket materials, materials for tritium permeation, and components for performance in a nuclear environment. The ITF provides a cyclic neutron/gamma flux as well as the numerous module and experiment support functions required for truly integrated tests

  1. Integration of the SSPM and STAGE with the MPACT Virtual Facility Distributed Test Bed.

    Energy Technology Data Exchange (ETDEWEB)

    Cipiti, Benjamin B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shoman, Nathan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    The Material Protection Accounting and Control Technologies (MPACT) program within DOE NE is working toward a 2020 milestone to demonstrate a Virtual Facility Distributed Test Bed. The goal of the Virtual Test Bed is to link all MPACT modeling tools, technology development, and experimental work to create a Safeguards and Security by Design capability for fuel cycle facilities. The Separation and Safeguards Performance Model (SSPM) forms the core safeguards analysis tool, and the Scenario Toolkit and Generation Environment (STAGE) code forms the core physical security tool. These models are used to design and analyze safeguards and security systems and generate performance metrics. Work over the past year has focused on how these models will integrate with the other capabilities in the MPACT program and specific model changes to enable more streamlined integration in the future. This report describes the model changes and plans for how the models will be used more collaboratively. The Virtual Facility is not designed to integrate all capabilities into one master code, but rather to maintain stand-alone capabilities that communicate results between codes more effectively.

  2. Integrated facilities modeling using QUEST and IGRIP

    International Nuclear Information System (INIS)

    Davis, K.R.; Haan, E.R.

    1995-01-01

    A QUEST model and associated detailed IGRIP models were developed and used to simulate several workcells in a proposed Plutonium Storage Facility (PSF). The models are being used by team members assigned to the program to improve communication and to assist in evaluating concepts and in performing trade-off studies which will result in recommendations and a final design. The model was designed so that it could be changed easily. The added flexibility techniques used to make changes easily are described in this paper in addition to techniques for integrating the QUEST and IGRIP products. Many of these techniques are generic in nature and can be applied to any modeling endeavor

  3. Using a qualitative approach for understanding hospital-affiliated integrated clinical and fitness facilities: characteristics and members' experiences.

    Science.gov (United States)

    Yang, Jingzhen; Kingsbury, Diana; Nichols, Matthew; Grimm, Kristin; Ding, Kele; Hallam, Jeffrey

    2015-06-19

    With health care shifting away from the traditional sick care model, many hospitals are integrating fitness facilities and programs into their clinical services in order to support health promotion and disease prevention at the community level. Through a series of focus groups, the present study assessed characteristics of hospital-affiliated integrated facilities located in Northeast Ohio, United States and members' experiences with respect to these facilities. Adult members were invited to participate in a focus group using a recruitment flyer. A total of 6 focus groups were conducted in 2013, each lasting one hour, ranging from 5 to 12 participants per group. The responses and discussions were recorded and transcribed verbatim, then analyzed independently by research team members. Major themes were identified after consensus was reached. The participants' average age was 57, with 56.8% currently under a doctor's care. Four major themes associated with integrated facilities and members' experiences emerged across the six focus groups: 1) facility/program, 2) social atmosphere, 3) provider, and 4) member. Within each theme, several sub-themes were also identified. A key feature of integrated facilities is the availability of clinical and fitness services "under one roof". Many participants remarked that they initially attended physical therapy, becoming members of the fitness facility afterwards, or vice versa. The participants had favorable views of and experiences with the superior physical environment and atmosphere, personal attention, tailored programs, and knowledgeable, friendly, and attentive staff. In particular, participants favored the emphasis on preventive care and the promotion of holistic health and wellness. These results support the integration of wellness promotion and programming with traditional medical care and call for the further evaluation of such a model with regard to participants' health outcomes.

  4. Integrated Disposal Facility FY2011 Glass Testing Summary Report

    International Nuclear Information System (INIS)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Westsik, Joseph H.

    2011-01-01

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 x 10 5 m 3 of glass (Certa and Wells 2010). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 8.9 x 10 14 Bq total activity) of long-lived radionuclides, principally 99 Tc (t 1/2 = 2.1 x 10 5 ), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2011 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses.

  5. CMT scaling analysis and distortion evaluation in passive integral test facility

    International Nuclear Information System (INIS)

    Deng Chengcheng; Qin Benke; Wang Han; Chang Huajian

    2013-01-01

    Core makeup tank (CMT) is the crucial device of AP1000 passive core cooling system, and reasonable scaling analysis of CMT plays a key role in the design of passive integral test facilities. H2TS method was used to perform scaling analysis for both circulating mode and draining mode of CMT. And then, the similarity criteria for CMT important processes were applied in the CMT scaling design of the ACME (advanced core-cooling mechanism experiment) facility now being built in China. Furthermore, the scaling distortion results of CMT characteristic Ⅱ groups of ACME were calculated. At last, the reason of scaling distortion was analyzed and the distortion evaluation was conducted for ACME facility. The dominant processes of CMT circulating mode can be adequately simulated in the ACME facility, but the steam condensation process during CMT draining is not well preserved because the excessive CMT mass leads to more energy to be absorbed by cold metal. However, comprehensive analysis indicates that the ACME facility with high-pressure simulation scheme is able to properly represent CMT's important phenomena and processes of prototype nuclear plant. (authors)

  6. Vitrification Facility integrated system performance testing report

    International Nuclear Information System (INIS)

    Elliott, D.

    1997-01-01

    This report provides a summary of component and system performance testing associated with the Vitrification Facility (VF) following construction turnover. The VF at the West Valley Demonstration Project (WVDP) was designed to convert stored radioactive waste into a stable glass form for eventual disposal in a federal repository. Following an initial Functional and Checkout Testing of Systems (FACTS) Program and subsequent conversion of test stand equipment into the final VF, a testing program was executed to demonstrate successful performance of the components, subsystems, and systems that make up the vitrification process. Systems were started up and brought on line as construction was completed, until integrated system operation could be demonstrated to produce borosilicate glass using nonradioactive waste simulant. Integrated system testing and operation culminated with a successful Operational Readiness Review (ORR) and Department of Energy (DOE) approval to initiate vitrification of high-level waste (HLW) on June 19, 1996. Performance and integrated operational test runs conducted during the test program provided a means for critical examination, observation, and evaluation of the vitrification system. Test data taken for each Test Instruction Procedure (TIP) was used to evaluate component performance against system design and acceptance criteria, while test observations were used to correct, modify, or improve system operation. This process was critical in establishing operating conditions for the entire vitrification process

  7. Derivation of integral energy balance for the manotea facility

    Energy Technology Data Exchange (ETDEWEB)

    Pollman, Anthony, E-mail: pollman@nps.edu [Mechanical and Aeronautical Engineering Department, United States Naval Postgraduate School, Monterey, CA 93943 (United States); Marzo, Marino di [Fire Protection Engineering Department, University of Maryland, College Park, MD 20742 (United States)

    2013-12-15

    Highlights: • An integral energy balance was derived for the MANOTEA facility. • A second equation was derived which frames transients in terms of inventory alone. • Both equations were implemented and showed good agreement with experimental data. • The equations capture the physical mechanisms behind MANOTEA transients. • Physical understanding is required in order to properly model these transients with TRACE. - Abstract: Rapid-condensation-induced fluid motion occurs in several nuclear reactor accident sequences, as well as during normal operation. Modeling these events is central to our ability to regulate and ensure safe reactor operations. The UMD-USNA Near One-dimensional Transient Experimental Apparatus (MANOTEA) was constructed in order to create a rapid-condensation dataset for subsequent comparison to TRACE output. This paper outlines a derivation of the energy balance for the facility. A path integral based on mass and energy, rather than fluid mechanical, considerations is derived in order to characterize the physical mechanisms governing MANOTEA transients. This equation is further simplified to obtain an expression that frames transients in term of liquid inventory alone. Using data obtained from an actual transient, the path integral is implemented using three variables (change in liquid inventory, liquid inventory as a function of time, and change in metal temperature) to predict the outcome of a fourth independently measured variable (condenser pressure as a function of time). The implementation yields a very good approximation of the actual data. The inventory equation is also implemented and shows reasonable agreement. These equations, and the physical intuition that they yield, are key to properly characterizing MANOTEA transients and any subsequent modeling efforts.

  8. EPICS - MDSplus integration in the ITER Neutral Beam Test Facility

    International Nuclear Information System (INIS)

    Luchetta, Adriano; Manduchi, Gabriele; Barbalace, Antonio; Soppelsa, Anton; Taliercio, Cesare

    2011-01-01

    SPIDER, the ITER-size ion-source test bed in the ITER Neutral Beam Test Facility, is a fusion device requiring a complex central system to provide control and data acquisition, referred to as CODAS. The CODAS software architecture will rely on EPICS and MDSplus, two open-source, collaborative software frameworks, targeted at control and data acquisition, respectively. EPICS has been selected as ITER CODAC middleware and, as the final deliverable of the Neutral Beam Test Facility is the procurement of the ITER Heating Neutral Beam Injector, we decided to adopt this ITER technology. MDSplus is a software package for data management, supporting advanced concepts, such as platform and underlying hardware independence, self description data, and data driven model. The combined use of EPICS and MDSplus is not new in fusion, but their level of integration will be new in SPIDER, achieved by a more refined data access layer. The paper presents the integration software to use effectively EPICS and MDSplus, including the definition of appropriate EPICS records to interact with MDSplus. The MDSplus and EPICS archive concepts are also compared on the basis of performance tests and data streaming is investigated by ad-hoc measurements.

  9. Vehicle Testing and Integration Facility; NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-02

    Engineers at the National Renewable Energy Laboratory’s (NREL’s) Vehicle Testing and Integration Facility (VTIF) are developing strategies to address two separate but equally crucial areas of research: meeting the demands of electric vehicle (EV) grid integration and minimizing fuel consumption related to vehicle climate control. Dedicated to renewable and energy-efficient solutions, the VTIF showcases technologies and systems designed to increase the viability of sustainably powered vehicles. NREL researchers instrument every class of on-road vehicle, conduct hardware and software validation for EV components and accessories, and develop analysis tools and technology for the Department of Energy, other government agencies, and industry partners.

  10. Integral test facilities for validation of the performance of passive safety systems and natural circulation

    International Nuclear Information System (INIS)

    Choi, J. H.

    2010-10-01

    Passive safety systems are becoming an important component in advanced reactor designs. This has led to an international interest in examining natural circulation phenomena as this may play an important role in the operation of these passive safety systems. Understanding reactor system behaviour is a challenging process due to the complex interactions between components and associated phenomena. Properly scaled integral test facilities can be used to explore these complex interactions. In addition, system analysis computer codes can be used as predictive tools in understanding the complex reactor system behaviour. However, before the application of system analysis computer codes for reactor design, it is capability in making predictions needs to be validated against the experimental data from a properly scaled integral test facility. The IAEA has organized a coordinated research project (CRP) on natural circulation phenomena, modeling and reliability of passive systems that utilize natural circulation. This paper is a part of research results from this CRP and describes representative international integral test facilities that can be used for data collection for reactor types in which natural circulation may play an important role. Example experiments were described along with the analyses of these example cases in order to examine the ability of system codes to model the phenomena that are occurring in the test facilities. (Author)

  11. Integrated Disposal Facility FY2011 Glass Testing Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Westsik, Joseph H.

    2011-09-29

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 x 10{sup 5} m{sup 3} of glass (Certa and Wells 2010). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 8.9 x 10{sup 14} Bq total activity) of long-lived radionuclides, principally {sup 99}Tc (t{sub 1/2} = 2.1 x 10{sup 5}), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2011 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses.

  12. Integrated Payment and Delivery Models Offer Opportunities and Challenges for Residential Care Facilities

    OpenAIRE

    Grabowski, David C.; Caudry, Daryl J.; Dean, Katie M.; Stevenson, David G.

    2015-01-01

    Under health care reform, a series of new financing and delivery models are being piloted to integrate health and long-term care services for older adults. To date, these programs have not encompassed residential care facilities, with most programs focusing on long-term care recipients in the community or the nursing home. Our analyses indicate that individuals living in residential care facilities have similarly high rates of chronic illness and Medicare utilization when compared with simila...

  13. Structural integrity assessment based on the HFR Petten neutron beam facilities

    CERN Document Server

    Ohms, C; Idsert, P V D

    2002-01-01

    Neutrons are becoming recognized as a valuable tool for structural-integrity assessment of industrial components and advanced materials development. Microstructure, texture and residual stress analyses are commonly performed by neutron diffraction and a joint CEN/ISO Pre-Standard for residual stress analysis is under development. Furthermore neutrons provide for defects analyses, i.e. precipitations, voids, pores and cracks, through small-angle neutron scattering (SANS) or radiography. At the High Flux Reactor, 12 beam tubes have been installed for the extraction of thermal neutrons for such applications. Two of them are equipped with neutron diffractometers for residual stress and structure determination and have been extensively used in the past. Several other facilities are currently being reactivated and upgraded. These include the SANS and radiography facilities as well as a powder diffractometer. This paper summarizes the main characteristics and current status of these facilities as well as recently in...

  14. Validation of an integral conceptual model of frailty in older residents of assisted living facilities.

    Science.gov (United States)

    Gobbens, Robbert J J; Krans, Anita; van Assen, Marcel A L M

    2015-01-01

    The aim of this cross-sectional study was to examine the validity of an integral model of the associations between life-course determinants, disease(s), frailty, and adverse outcomes in older persons who are resident in assisted living facilities. Between June 2013 and May 2014 seven assisted living facilities were contacted. A total of 221 persons completed the questionnaire on life-course determinants, frailty (using the Tilburg Frailty Indicator), self-reported chronic diseases, and adverse outcomes disability, quality of life, health care utilization, and falls. Adverse outcomes were analyzed with sequential (logistic) regression analyses. The integral model is partially validated. Life-course determinants and disease(s) affected only physical frailty. All three frailty domains (physical, psychological, social) together affected disability, quality of life, visits to a general practitioner, and falls. Contrary to the model, disease(s) had no effect on adverse outcomes after controlling for frailty. Life-course determinants affected adverse outcomes, with unhealthy lifestyle having consistent negative effects, and women had more disability, scored lower on physical health, and received more personal and informal care after controlling for all other predictors. The integral model of frailty is less useful for predicting adverse outcomes of residents of assisted living facilities than for community-dwelling older persons, because these residents are much frailer and already have access to healthcare facilities. The present study showed that a multidimensional assessment of frailty, distinguishing three domains of frailty (physical, psychological, social), is beneficial with respect to predicting adverse outcomes in residents of assisted living facilities. Copyright © 2015. Published by Elsevier Ireland Ltd.

  15. Track Reconstruction with Cosmic Ray Data at the Tracker Integration Facility

    CERN Document Server

    Adam, Wolfgang; Dragicevic, Marko; Friedl, Markus; Fruhwirth, R; Hansel, S; Hrubec, Josef; Krammer, Manfred; Oberegger, Margit; Pernicka, Manfred; Schmid, Siegfried; Stark, Roland; Steininger, Helmut; Uhl, Dieter; Waltenberger, Wolfgang; Widl, Edmund; Van Mechelen, Pierre; Cardaci, Marco; Beaumont, Willem; de Langhe, Eric; de Wolf, Eddi A; Delmeire, Evelyne; Hashemi, Majid; Bouhali, Othmane; Charaf, Otman; Clerbaux, Barbara; Elgammal, J.-P. Dewulf. S; Hammad, Gregory Habib; de Lentdecker, Gilles; Marage, Pierre Edouard; Vander Velde, Catherine; Vanlaer, Pascal; Wickens, John; Adler, Volker; Devroede, Olivier; De Weirdt, Stijn; D'Hondt, Jorgen; Goorens, Robert; Heyninck, Jan; Maes, Joris; Mozer, Matthias Ulrich; Tavernier, Stefaan; Van Lancker, Luc; Van Mulders, Petra; Villella, Ilaria; Wastiels, C; Bonnet, Jean-Luc; Bruno, Giacomo; De Callatay, Bernard; Florins, Benoit; Giammanco, Andrea; Gregoire, Ghislain; Keutgen, Thomas; Kcira, Dorian; Lemaitre, Vincent; Michotte, Daniel; Militaru, Otilia; Piotrzkowski, Krzysztof; Quertermont, L; Roberfroid, Vincent; Rouby, Xavier; Teyssier, Daniel; Daubie, Evelyne; Anttila, Erkki; Czellar, Sandor; Engstrom, Pauli; Harkonen, J; Karimaki, V; Kostesmaa, J; Kuronen, Auli; Lampen, Tapio; Linden, Tomas; Luukka, Panja-Riina; Maenpaa, T; Michal, Sebastien; Tuominen, Eija; Tuominiemi, Jorma; Ageron, Michel; Baulieu, Guillaume; Bonnevaux, Alain; Boudoul, Gaelle; Chabanat, Eric; Chabert, Eric Christian; Chierici, Roberto; Contardo, Didier; Della Negra, Rodolphe; Dupasquier, Thierry; Gelin, Georges; Giraud, Noël; Guillot, Gérard; Estre, Nicolas; Haroutunian, Roger; Lumb, Nicholas; Perries, Stephane; Schirra, Florent; Trocme, Benjamin; Vanzetto, Sylvain; Agram, Jean-Laurent; Blaes, Reiner; Drouhin, Frédéric; Ernenwein, Jean-Pierre; Fontaine, Jean-Charles; Berst, Jean-Daniel; Brom, Jean-Marie; Didierjean, Francois; Goerlach, Ulrich; Graehling, Philippe; Gross, Laurent; Hosselet, J; Juillot, Pierre; Lounis, Abdenour; Maazouzi, Chaker; Olivetto, Christian; Strub, Roger; Van Hove, Pierre; Anagnostou, Georgios; Brauer, Richard; Esser, Hans; Feld, Lutz; Karpinski, Waclaw; Klein, Katja; Kukulies, Christoph; Olzem, Jan; Ostapchuk, Andrey; Pandoulas, Demetrios; Pierschel, Gerhard; Raupach, Frank; Schael, Stefan; Schwering, Georg; Sprenger, Daniel; Thomas, Maarten; Weber, Markus; Wittmer, Bruno; Wlochal, Michael; Beissel, Franz; Bock, E; Flugge, G; Gillissen, C; Hermanns, Thomas; Heydhausen, Dirk; Jahn, Dieter; Kaussen, Gordon; Linn, Alexander; Perchalla, Lars; Poettgens, Michael; Pooth, Oliver; Stahl, Achim; Zoeller, Marc Henning; Buhmann, Peter; Butz, Erik; Flucke, Gero; Hamdorf, Richard Helmut; Hauk, Johannes; Klanner, Robert; Pein, Uwe; Schleper, Peter; Steinbruck, G; Blum, P; De Boer, Wim; Dierlamm, Alexander; Dirkes, Guido; Fahrer, Manuel; Frey, Martin; Furgeri, Alexander; Hartmann, Frank; Heier, Stefan; Hoffmann, Karl-Heinz; Kaminski, Jochen; Ledermann, Bernhard; Liamsuwan, Thiansin; Muller, S; Muller, Th; Schilling, Frank-Peter; Simonis, Hans-Jürgen; Steck, Pia; Zhukov, Valery; Cariola, P; De Robertis, Giuseppe; Ferorelli, Raffaele; Fiore, Luigi; Preda, M; Sala, Giuliano; Silvestris, Lucia; Tempesta, Paolo; Zito, Giuseppe; Creanza, Donato; De Filippis, Nicola; De Palma, Mauro; Giordano, Domenico; Maggi, Giorgio; Manna, Norman; My, Salvatore; Selvaggi, Giovanna; Albergo, Sebastiano; Chiorboli, Massimiliano; Costa, Salvatore; Galanti, Mario; Giudice, Nunzio; Guardone, Nunzio; Noto, Francesco; Potenza, Renato; Saizu, Mirela Angela; Sparti, V; Sutera, Concetta; Tricomi, Alessia; Tuve, Cristina; Brianzi, Mirko; Civinini, Carlo; Maletta, Fernando; Manolescu, Florentina; Meschini, Marco; Paoletti, Simone; Sguazzoni, Giacomo; Broccolo, B; Ciulli, Vitaliano; Focardi, R. D'Alessandro. E; Frosali, Simone; Genta, Chiara; Landi, Gregorio; Lenzi, Piergiulio; Macchiolo, Anna; Magini, Nicolo; Parrini, Giuliano; Scarlini, Enrico; Cerati, Giuseppe Benedetto; Azzi, Patrizia; Bacchetta, Nicola; Candelori, Andrea; Dorigo, Tommaso; Kaminsky, A; Karaevski, S; Khomenkov, Volodymyr; Reznikov, Sergey; Tessaro, Mario; Bisello, Dario; De Mattia, Marco; Giubilato, Piero; Loreti, Maurizio; Mattiazzo, Serena; Nigro, Massimo; Paccagnella, Alessandro; Pantano, Devis; Pozzobon, Nicola; Tosi, Mia; Bilei, Gian Mario; Checcucci, Bruno; Fano, Livio; Servoli, Leonello; Ambroglini, Filippo; Babucci, Ezio; Benedetti, Daniele; Biasini, Maurizio; Caponeri, Benedetta; Covarelli, Roberto; Giorgi, Marco; Lariccia, Paolo; Mantovani, Giancarlo; Marcantonini, Marta; Postolache, Vasile; Santocchia, Attilio; Spiga, Daniele; Bagliesi, Giuseppe; Balestri, Gabriele; Berretta, Luca; Bianucci, S; Boccali, Tommaso; Bosi, Filippo; Bracci, Fabrizio; Castaldi, Rino; Ceccanti, Marco; Cecchi, Roberto; Cerri, Claudio; Cucoanes, Andi Sebastian; Dell'Orso, Roberto; Dobur, Didar; Dutta, Suchandra; Giassi, Alessandro; Giusti, Simone; Kartashov, Dmitry; Kraan, Aafke; Lomtadze, Teimuraz; Lungu, George-Adrian; Magazzu, Guido; Mammini, Paolo; Mariani, Filippo; Martinelli, Giovanni; Moggi, Andrea; Palla, Fabrizio; Palmonari, Francesco; Petragnani, Giulio; Profeti, Alessandro; Raffaelli, Fabrizio; Rizzi, Domenico; Sanguinetti, Giulio; Sarkar, Subir; Sentenac, Daniel; Serban, Alin Titus; Slav, Adrian; Soldani, A; Spagnolo, Paolo; Tenchini, Roberto; Tolaini, Sergio; Venturi, Andrea; Verdini, Piero Giorgio; Vos, Marcel; Zaccarelli, Luciano; Avanzini, Carlo; Basti, Andrea; Benucci, Leonardo; Bocci, Andrea; Cazzola, Ugo; Fiori, Francesco; Linari, Stefano; Massa, Maurizio; Messineo, Alberto; Segneri, Gabriele; Tonelli, Guido; Azzurri, Paolo; Bernardini, Jacopo; Borrello, Laura; Calzolari, Federico; Foa, Lorenzo; Gennai, Simone; Ligabue, Franco; Petrucciani, Giovanni; Rizzi, Andrea; Yang, Zong-Chang; Benotto, Franco; Demaria, Natale; Dumitrache, Floarea; Farano, R; Borgia, Maria Assunta; Castello, Roberto; Costa, Marco; Migliore, Ernesto; Romero, Alessandra; Abbaneo, Duccio; Abbas, M; Ahmed, Ijaz; Akhtar, I; Albert, Eric; Bloch, Christoph; Breuker, Horst; Butt, Shahid Aleem; Buchmuller, Oliver; Cattai, Ariella; Delaere, Christophe; Delattre, Michel; Edera, Laura Maria; Engstrom, Pauli; Eppard, Michael; Gateau, Maryline; Gill, Karl; Giolo-Nicollerat, Anne-Sylvie; Grabit, Robert; Honma, Alan; Huhtinen, Mika; Kloukinas, Kostas; Kortesmaa, Jarmo; Kottelat, Luc-Joseph; Kuronen, Auli; Leonardo, Nuno; Ljuslin, Christer; Mannelli, Marcello; Masetti, Lorenzo; Marchioro, Alessandro; Mersi, Stefano; Michal, Sebastien; Mirabito, Laurent; Muffat-Joly, Jeannine; Onnela, Antti; Paillard, Christian; Pal, Imre; Pernot, Jean-Francois; Petagna, Paolo; Petit, Patrick; Piccut, C; Pioppi, Michele; Postema, Hans; Ranieri, Riccardo; Ricci, Daniel; Rolandi, Gigi; Ronga, Frederic Jean; Sigaud, Christophe; Syed, A; Siegrist, Patrice; Tropea, Paola; Troska, Jan; Tsirou, Andromachi; Vander Donckt, Muriel; Vasey, François; Alagoz, Enver; Amsler, Claude; Chiochia, Vincenzo; Regenfus, Christian; Robmann, Peter; Rochet, Jacky; Rommerskirchen, Tanja; Schmidt, Alexander; Steiner, Stefan; Wilke, Lotte; Church, Ivan; Cole, Joanne; Coughlan, John A; Gay, Arnaud; Taghavi, S; Tomalin, Ian R; Bainbridge, Robert; Cripps, Nicholas; Fulcher, Jonathan; Hall, Geoffrey; Noy, Matthew; Pesaresi, Mark; Radicci, Valeria; Raymond, David Mark; Sharp, Peter; Stoye, Markus; Wingham, Matthew; Zorba, Osman; Goitom, Israel; Hobson, Peter R; Reid, Ivan; Teodorescu, Liliana; Hanson, Gail; Jeng, Geng-Yuan; Liu, Haidong; Pasztor, Gabriella; Satpathy, Asish; Stringer, Robert; Mangano, Boris; Affolder, K; Affolder, T; Allen, Andrea; Barge, Derek; Burke, Samuel; Callahan, D; Campagnari, Claudio; Crook, A; D'Alfonso, Mariarosaria; Dietch, J; Garberson, Jeffrey; Hale, David; Incandela, H; Incandela, Joe; Jaditz, Stephen; Kalavase, Puneeth; Kreyer, Steven Lawrence; Kyre, Susanne; Lamb, James; Mc Guinness, C; Mills, C; Nguyen, Harold; Nikolic, Milan; Lowette, Steven; Rebassoo, Finn; Ribnik, Jacob; Richman, Jeffrey; Rubinstein, Noah; Sanhueza, S; Shah, Yousaf Syed; Simms, L; Staszak, D; Stoner, J; Stuart, David; Swain, Sanjay Kumar; Vlimant, Jean-Roch; White, Dean; Ulmer, Keith; Wagner, Stephen Robert; Bagby, Linda; Bhat, Pushpalatha C; Burkett, Kevin; Cihangir, Selcuk; Gutsche, Oliver; Jensen, Hans; Johnson, Mark; Luzhetskiy, Nikolay; Mason, David; Miao, Ting; Moccia, Stefano; Noeding, Carsten; Ronzhin, Anatoly; Skup, Ewa; Spalding, William J; Spiegel, Leonard; Tkaczyk, Slawek; Yumiceva, Francisco; Zatserklyaniy, Andriy; Zerev, E; Anghel, Ioana Maria; Bazterra, Victor Eduardo; Gerber, Cecilia Elena; Khalatian, S; Shabalina, Elizaveta; Baringer, Philip; Bean, Alice; Chen, Jie; Hinchey, Carl Louis; Martin, Christophe; Moulik, Tania; Robinson, Richard; Gritsan, Andrei; Lae, Chung Khim; Tran, Nhan Viet; Everaerts, Pieter; Hahn, Kristan Allan; Harris, Philip; Nahn, Steve; Rudolph, Matthew; Sung, Kevin; Betchart, Burton; Demina, Regina; Gotra, Yury; Korjenevski, Sergey; Miner, Daniel Carl; Orbaker, Douglas; Christofek, Leonard; Hooper, Ryan; Landsberg, Greg; Nguyen, Duong; Narain, Meenakshi; Speer, Thomas; Tsang, Ka Vang

    2008-01-01

    The subsystems of the CMS silicon strip tracker were integrated and commissioned at the Tracker Integration Facility (TIF) in the period from November 2006 to July 2007. As part of the commissioning, large samples of cosmic ray data were recorded under various running conditions in the absence of a magnetic field. Cosmic rays detected by scintillation counters were used to trigger the readout of up to 15\\,\\% of the final silicon strip detector, and over 4.7~million events were recorded. This document describes the cosmic track reconstruction and presents results on the performance of track and hit reconstruction as from dedicated analyses.

  16. An integral effect test facility of the SMART, SMART ITL

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyun Sik; Moon, Sang Ki; Kim, Yeon Sik; Cho, Seok; Choi, Ki Yong; Bae, Hwang; Kim, Dong Eok; Choi, Nam Hyun; Min, Kyoung Ho; Ko, Yung Joo; Shin, Yong Cheol; Park, Rae Joon; Lee, Won Jae; Song, Chul Hwa; Yi, Sung Jae [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    SMART (System integrated Modular Advanced ReacTor) is a 330 MWth integral pressurized water reactor (iPWR) developed by KAERI and had obtained standard design approval (SDA) from Korean regulatory authority on July 2012. In this SMART design main components including a pressurizer, reactor coolant pumps and steam generators are installed in a reactor pressure vessel without any large connecting pipes. As the LBLOCA scenario is inherently excluded, its safety systems could be simplified only to ensure the safety during the SBLOCA scenarios and the other system transients. An integral effect test loop for the SMART (SMART ITL), or called as FESTA, had been designed to simulate the integral thermal hydraulic behavior of the SMART. The objectives of the SMART ITL are to investigate and understand the integral performance of reactor systems and components and the thermal hydraulic phenomena occurred in the system during normal, abnormal and emergency conditions, and to verify the system safety during various design basis events of the SMART. The integral effect test data will also be used to validate the related thermal hydraulic models of the safety analysis code such as TASS/SMR S, which is used for performance and accident analysis of the SMART design. This paper introduces the scaling analysis and scientific design of the integral test facility of the SMART, SMART ITL and its scaling analysis results.

  17. Framework for Integrating Safety, Operations, Security, and Safeguards in the Design and Operation of Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Darby, John L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Horak, Karl Emanuel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaChance, Jeffrey L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Tolk, Keith Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Whitehead, Donnie Wayne [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2007-10-01

    The US is currently on the brink of a nuclear renaissance that will result in near-term construction of new nuclear power plants. In addition, the Department of Energy’s (DOE) ambitious new Global Nuclear Energy Partnership (GNEP) program includes facilities for reprocessing spent nuclear fuel and reactors for transmuting safeguards material. The use of nuclear power and material has inherent safety, security, and safeguards (SSS) concerns that can impact the operation of the facilities. Recent concern over terrorist attacks and nuclear proliferation led to an increased emphasis on security and safeguard issues as well as the more traditional safety emphasis. To meet both domestic and international requirements, nuclear facilities include specific SSS measures that are identified and evaluated through the use of detailed analysis techniques. In the past, these individual assessments have not been integrated, which led to inefficient and costly design and operational requirements. This report provides a framework for a new paradigm where safety, operations, security, and safeguards (SOSS) are integrated into the design and operation of a new facility to decrease cost and increase effectiveness. Although the focus of this framework is on new nuclear facilities, most of the concepts could be applied to any new, high-risk facility.

  18. Integrated Disposal Facility FY 2012 Glass Testing Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, Eric M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kerisit, Sebastien N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Krogstad, Eirik J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burton, Sarah D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bjornstad, Bruce N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Freedman, Vicky L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cantrell, Kirk J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle MV [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Crum, Jarrod V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westsik, Joseph H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-03-29

    PNNL is conducting work to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility for Hanford immobilized low-activity waste (ILAW). Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program, PNNL is implementing a strategy, consisting of experimentation and modeling, to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. Key activities in FY12 include upgrading the STOMP/eSTOMP codes to do near-field modeling, geochemical modeling of PCT tests to determine the reaction network to be used in the STOMP codes, conducting PUF tests on selected glasses to simulate and accelerate glass weathering, developing a Monte Carlo simulation tool to predict the characteristics of the weathered glass reaction layer as a function of glass composition, and characterizing glasses and soil samples exhumed from an 8-year lysimeter test. The purpose of this report is to summarize the progress made in fiscal year (FY) 2012 and the first quarter of FY 2013 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of LAW glasses.

  19. Integration of radiation and physical safety in large radiator facilities

    International Nuclear Information System (INIS)

    Lima, P.P.M.; Benedito, A.M.; Lima, C.M.A.; Silva, F.C.A. da

    2017-01-01

    Growing international concern about radioactive sources after the Sept. 11, 2001 event has led to a strengthening of physical safety. There is evidence that the illicit use of radioactive sources is a real possibility and may result in harmful radiological consequences for the population and the environment. In Brazil there are about 2000 medical, industrial and research facilities with radioactive sources, of which 400 are Category 1 and 2 classified by the - International Atomic Energy Agency - AIEA, where large irradiators occupy a prominent position due to the very high cobalt-60 activities. The radiological safety is well established in these facilities, due to the intense work of the authorities in the Country. In the paper the main aspects on radiological and physical safety applied in the large radiators are presented, in order to integrate both concepts for the benefit of the safety as a whole. The research showed that the items related to radiation safety are well defined, for example, the tests on the access control devices to the irradiation room. On the other hand, items related to physical security, such as effective control of access to the company, use of safety cameras throughout the company, are not yet fully incorporated. Integration of radiation and physical safety is fundamental for total safety. The elaboration of a Brazilian regulation on the subject is of extreme importance

  20. Integrated numerical platforms for environmental dose assessments of large tritium inventory facilities

    International Nuclear Information System (INIS)

    Castro, P.; Ardao, J.; Velarde, M.; Sedano, L.; Xiberta, J.

    2013-01-01

    Related with a prospected new scenario of large inventory tritium facilities [KATRIN at TLK, CANDUs, ITER, EAST, other coming] the prescribed dosimetric limits by ICRP-60 for tritium committed-doses are under discussion requiring, in parallel, to surmount the highly conservative assessments by increasing the refinement of dosimetric-assessments in many aspects. Precise Lagrangian-computations of dosimetric cloud-evolution after standardized (normal/incidental/SBO) tritium cloud emissions are today numerically open to the perfect match of real-time meteorological-data, and patterns data at diverse scales for prompt/early and chronic tritium dose assessments. The trends towards integrated-numerical-platforms for environmental-dose assessments of large tritium inventory facilities under development.

  1. Why Integrate Educational and Community Facilities?

    Science.gov (United States)

    Fessas-Emmanouil, Helen D.

    1978-01-01

    Discusses coordination of educational and community facilities in order to encourage more rational investments and more efficient use of premises. Such coordination may reduce the economic burden imposed upon citizens for the provision of separate facilities for school and community. However, implementation of such a facility presupposes radical…

  2. Integrated O&M for energy generation and exchange facilities

    International Nuclear Information System (INIS)

    2016-01-01

    Ingeteam Service, part of the Ingeteam Group, is a leading company in the provision of integrated O&M services at energy generation and exchange facilities worldwide. From its head office in the Albacete Science and Technology Park, it manages the work of the 1,300 employees that make up its global workforce, rendering services to wind farms, PV installations and power generation plants. In addition, it maintains an active participation strategy in a range of R&D+i programmes that improve the existing technologies and are geared towards new production systems and new diagnostic techniques, applied to renewables installation maintenance. (Author)

  3. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This report presents a summary design description of the Conceptual Design for an Integral Monitored Retrievable Storage (MRS) Facility, as prepared by The Ralph M. Parsons Company under an A-E services contract with the Richland Operations Office of the Department of Energy. More detailed design requirements and design data are set forth in the Basis for Design and Design Report, bound under separate cover and available for reference by those desiring such information. The design data provided in this Design Report Executive Summary, the Basis for Design, and the Design Report include contributions by the Waste Technology Services Division of Westinghouse Electric Corporation (WEC), which was responsible for the development of the waste receiving, packaging, and storage systems, and Golder Associates Incorporated (GAI), which supported the design development with program studies. The MRS Facility design requirements, which formed the basis for the design effort, were prepared by Pacific Northwest Laboratory for the US Department of Energy, Richland Operations Office, in the form of a Functional Design Criteria (FDC) document, Rev. 4, August 1985. 9 figs., 6 tabs

  4. Integrated monitoring and reviewing systems for the Rokkasho Spent Fuel Receipt and Storage Facility

    International Nuclear Information System (INIS)

    Yokota, Yasuhiro; Ishikawa, Masayuki; Matsuda, Yuji

    1998-01-01

    The Rokkasho Spent Fuel Receipt and Storage (RSFS) Facility at the Rokkasho Reprocessing Plant (RRP) in Japan is expected to begin operations in 1998. Effective safeguarding by International Atomic Energy Agency (IAEA) and Japan Atomic Energy Bureau (JAEB) inspectors requires monitoring the time of transfer, direction of movement, and number of spent fuel assemblies transferred. At peak throughput, up to 1,000 spent fuel assemblies will be accepted by the facility in a 90-day period. In order for the safeguards inspector to efficiently review the resulting large amounts of inspection information, an unattended monitoring system was developed that integrates containment and surveillance (C/S) video with radiation monitors. This allows for an integrated review of the facility's radiation data, C/S video, and operator declaration data. This paper presents an outline of the integrated unattended monitoring hardware and associated data reviewing software. The hardware consists of a multicamera optical surveillance (MOS) system radiation monitoring gamma-ray and neutron detector (GRAND) electronics, and an intelligent local operating network (ILON). The ILON was used for time synchronization and MOS video triggers. The new software consists of a suite of tools, each one specific to a single data type: radiation data, surveillance video, and operator declarations. Each tool can be used in a stand-alone mode as a separate ion application or configured to communicate and match time-synchronized data with any of the other tools. A data summary and comparison application (Integrated Review System [IRS]) coordinates the use of all of the data-specific review tools under a single-user interface. It therefore automates and simplifies the importation of data and the data-specific analyses

  5. Integration of distributed plant process computer systems to nuclear power generation facilities

    International Nuclear Information System (INIS)

    Bogard, T.; Finlay, K.

    1996-01-01

    Many operating nuclear power generation facilities are replacing their plant process computer. Such replacement projects are driven by equipment obsolescence issues and associated objectives to improve plant operability, increase plant information access, improve man machine interface characteristics, and reduce operation and maintenance costs. This paper describes a few recently completed and on-going replacement projects with emphasis upon the application integrated distributed plant process computer systems. By presenting a few recent projects, the variations of distributed systems design show how various configurations can address needs for flexibility, open architecture, and integration of technological advancements in instrumentation and control technology. Architectural considerations for optimal integration of the plant process computer and plant process instrumentation ampersand control are evident from variations of design features

  6. Coal-fired MHD combustor development project: Phase 3D

    Science.gov (United States)

    1985-05-01

    This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase 3D) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.

  7. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    International Nuclear Information System (INIS)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP

  8. The integration of expert knowledge in decision support systems for facility location planning

    NARCIS (Netherlands)

    Arentze, T.A.; Borgers, A.W.J.; Timmermans, H.J.P.

    1995-01-01

    The integration of expert systems in DSS has led to a new generation of systems commonly referred to as knowledge-based or intelligent DSS. This paper investigates the use of expert system technology for the development of a knowledge-based DSS for the planning of retail and service facilities. The

  9. IOTA (Integrable Optics Test Accelerator): facility and experimental beam physics program

    Science.gov (United States)

    Antipov, S.; Broemmelsiek, D.; Bruhwiler, D.; Edstrom, D.; Harms, E.; Lebedev, V.; Leibfritz, J.; Nagaitsev, S.; Park, C. S.; Piekarz, H.; Piot, P.; Prebys, E.; Romanov, A.; Ruan, J.; Sen, T.; Stancari, G.; Thangaraj, C.; Thurman-Keup, R.; Valishev, A.; Shiltsev, V.

    2017-03-01

    The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150 MeV/c, respectively. The research program includes the study of nonlinear focusing integrable optical beam lattices based on special magnets and electron lenses, beam dynamics of space-charge effects and their compensation, optical stochastic cooling, and several other experiments. In this article, we present the design and main parameters of the facility, outline progress to date and provide the timeline of the construction, commissioning and research. The physical principles, design, and hardware implementation plans for the major IOTA experiments are also discussed.

  10. IOTA (Integrable Optics Test Accelerator): Facility and experimental beam physics program

    International Nuclear Information System (INIS)

    Antipov, Sergei; Broemmelsiek, Daniel; Bruhwiler, David; Edstrom, Dean; Harms, Elvin

    2017-01-01

    The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150 MeV/c, respectively. The research program includes the study of nonlinear focusing integrable optical beam lattices based on special magnets and electron lenses, beam dynamics of space-charge effects and their compensation, optical stochastic cooling, and several other experiments. In this article, we present the design and main parameters of the facility, outline progress to date and provide the timeline of the construction, commissioning and research. Finally, the physical principles, design, and hardware implementation plans for the major IOTA experiments are also discussed.

  11. Integrated software package for nuclear material safeguards in a MOX fuel fabrication facility

    International Nuclear Information System (INIS)

    Schreiber, H.J.; Piana, M.; Moussalli, G.; Saukkonen, H.

    2000-01-01

    Since computerized data processing was introduced to Safeguards at large bulk handling facilities, a large number of individual software applications have been developed for nuclear material Safeguards implementation. Facility inventory and flow data are provided in computerized format for performing stratification, sample size calculation and selection of samples for destructive and non-destructive assay. Data is collected from nuclear measurement systems running in attended, unattended mode and more recently from remote monitoring systems controlled. Data sets from various sources have to be evaluated for Safeguards purposes, such as raw data, processed data and conclusions drawn from data evaluation results. They are reported in computerized format at the International Atomic Energy Agency headquarters and feedback from the Agency's mainframe computer system is used to prepare and support Safeguards inspection activities. The integration of all such data originating from various sources cannot be ensured without the existence of a common data format and a database system. This paper describes the fundamental relations between data streams, individual data processing tools, data evaluation results and requirements for an integrated software solution to facilitate nuclear material Safeguards at a bulk handling facility. The paper also explains the basis for designing a software package to manage data streams from various data sources and for incorporating diverse data processing tools that until now have been used independently from each other and under different computer operating systems. (author)

  12. Structural Integrity Program for the Calcined Solids Storage Facilities at the Idaho Nuclear Technology and Engineering Center

    International Nuclear Information System (INIS)

    Bryant, J.W.; Nenni, J.A.

    2003-01-01

    This report documents the activities of the structural integrity program at the Idaho Nuclear Technology and Engineering Center relevant to the high-level waste Calcined Solids Storage Facilities and associated equipment, as required by DOE M 435.1-1, ''Radioactive Waste Management Manual.'' Based on the evaluation documented in this report, the Calcined Solids Storage Facilities are not leaking and are structurally sound for continued service. Recommendations are provided for continued monitoring of the Calcined Solids Storage Facilities

  13. Structural Integrity Program for the Calcined Solids Storage Facilities at the Idaho Nuclear Technology and Engineering Center

    International Nuclear Information System (INIS)

    Jeffrey Bryant

    2008-01-01

    This report documents the activities of the structural integrity program at the Idaho Nuclear Technology and Engineering Center relevant to the high-level waste Calcined Solids Storage Facilities and associated equipment, as required by DOE M 435.1-1, 'Radioactive Waste Management Manual'. Based on the evaluation documented in this report, the Calcined Solids Storage Facilities are not leaking and are structurally sound for continued service. Recommendations are provided for continued monitoring of the Calcined Solids Storage Facilities

  14. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  15. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  16. Consistent Posttest Calculations for LOCA Scenarios in LOBI Integral Facility

    Directory of Open Access Journals (Sweden)

    F. Reventós

    2012-01-01

    Full Text Available Integral test facilities (ITFs are one of the main tools for the validation of best estimate thermalhydraulic system codes. The experimental data are also of great value when compared to the experiment-scaled conditions in a full NPP. The LOBI was a single plus a triple-loop (simulated by one loop test facility electrically heated to simulate a 1300 MWe PWR. The scaling factor was 712 for the core power, volume, and mass flow. Primary and secondary sides contained all main active elements. Tests were performed for the characterization of phenomenologies relevant to large and small break LOCAs and special transients in PWRs. The paper presents the results of three posttest calculations of LOBI experiments. The selected experiments are BL-30, BL-44, and A1-84. They are LOCA scenarios of different break sizes and with different availability of safety injection components. The goal of the analysis is to improve the knowledge of the phenomena occurred in the facility in order to use it in further studies related to qualifying nodalizations of actual plants or to establish accuracy data bases for uncertainty methodologies. An example of procedure of implementing changes in a common nodalization valid for simulating tests occurred in a specific ITF is presented along with its confirmation based on posttests results.

  17. Development of an integrated facility for processing transuranium solid wastes at the Savannah River Plant

    International Nuclear Information System (INIS)

    Boersma, M.D.; Hootman, H.E.; Permar, P.H.

    1978-01-01

    An integrated facility is being designed for processing solid wastes contaminated with long-lived alpha emitting (TRU) nuclides; this waste has been stored retrievably at the Savannah River Plant since 1965. The stored waste, having a volume of 10 4 m 3 and containing 3x10 5 Ci of transuranics, consists of both mixed combustible trash and failed and obsolete equipment primarily from transuranic production and associated laboratory operations. The facility for processing solid transuranic waste will consist of five processing modules: 1) unpackaging, sorting, and assaying; 2) treatment of combustibles by controlled air incineration; 3) size reduction of noncombustibles by plasma-arc cutting followed by decontamination by electropolishing; 4) fixation of the processed waste in cement; and 5) packaging for shipment to a federal repository. The facility is projected for construction in the mid-1980's. Pilot facilities, sized to manage currently generated wastes, will also demonstrate the key process steps of incineration of combustibles and size reduction/decontamination of noncombustibles; these facilities are projected for 1980-81. Development programs leading to these extensive new facilities are described

  18. Development of an integrated facility for processing TRU solid wastes at the Savannah River Plant

    International Nuclear Information System (INIS)

    Boersma, M.D.; Hootman, H.E.; Permar, P.H.

    1977-01-01

    An integrated facility is being designed for processing solid wastes contaminated with long-lived alpha emitting (TRU) nuclides; this waste has been stored retrievably at the Savannah River Plant since 1965. The stored waste, having a volume of 10 4 m 3 and containing 3 x 10 5 Ci of transuranics, consists of both mixed combustible trash and failed and obsolete equipment primarily from transuranic production and associated laboratory operations. The facility for processing solid transuranic waste will consist of five processing modules: (1) unpackaging, sorting, and assaying; (2) treatment of combustibles by controlled air incineration; (3) size reduction of noncombustibles by plasma-arc cutting followed by decontamination by electropolishing; (4) fixation of the processed waste in cement; and (5) packaging for shipment to a federal repository. The facility is projected for construction in the mid-1980's. Pilot facilities, sized to manage currently generated wastes, will also demonstrate the key process steps of incineration of combustibles and size reduction/decontamination of noncombustibles; these facilities are projected for 1980-81. Development programs leading to these extensive new facilities are described

  19. Energy Systems Integration Laboratory | Energy Systems Integration Facility

    Science.gov (United States)

    | NREL Integration Laboratory Energy Systems Integration Laboratory Research in the Energy Systems Integration Laboratory is advancing engineering knowledge and market deployment of hydrogen technologies. Applications include microgrids, energy storage for renewables integration, and home- and station

  20. Grid Integration Webinars | Energy Systems Integration Facility | NREL

    Science.gov (United States)

    Grid Integration Webinars Grid Integration Webinars Watch presentations from NREL analysts on various topics related to grid integration. Wind Curtailment and the Value of Transmission under a 2050 renewable curtailment under these high wind scenarios. Text Version Grid Integration Webinar: Exploring

  1. MEASURE: An integrated data-analysis and model identification facility

    Science.gov (United States)

    Singh, Jaidip; Iyer, Ravi K.

    1990-01-01

    The first phase of the development of MEASURE, an integrated data analysis and model identification facility is described. The facility takes system activity data as input and produces as output representative behavioral models of the system in near real time. In addition a wide range of statistical characteristics of the measured system are also available. The usage of the system is illustrated on data collected via software instrumentation of a network of SUN workstations at the University of Illinois. Initially, statistical clustering is used to identify high density regions of resource-usage in a given environment. The identified regions form the states for building a state-transition model to evaluate system and program performance in real time. The model is then solved to obtain useful parameters such as the response-time distribution and the mean waiting time in each state. A graphical interface which displays the identified models and their characteristics (with real time updates) was also developed. The results provide an understanding of the resource-usage in the system under various workload conditions. This work is targeted for a testbed of UNIX workstations with the initial phase ported to SUN workstations on the NASA, Ames Research Center Advanced Automation Testbed.

  2. The development of functional requirement for integrated test facility

    International Nuclear Information System (INIS)

    Sim, B.S.; Oh, I.S.; Cha, K.H.; Lee, H.C.

    1994-01-01

    An Integrated Test Facility (ITF) is a human factors experimental environment comprised of a nuclear power plant function simulator, man-machine interfaces (MMI), human performance recording systems, and signal control and data analysis systems. In this study, we are going to describe how the functional requirements are developed by identification of both the characteristics of generic advanced control rooms and the research topics of world-wide research interest in human factors community. The functional requirements of user interface developed in this paper together with those of the other elements will be used for the design and implementation of the ITF which will serve as the basis for experimental research on a line of human factors topics. (author). 15 refs, 1 fig

  3. Geology of the Integrated Disposal Facility Trench

    International Nuclear Information System (INIS)

    Reidel, Steve P.; Fecht, Karl R.

    2005-01-01

    This report describes the geology of the integrated Disposal Facility (IDF) Trench. The stratigraphy consists of some of the youngest sediments of the Missoula floods (younger than 770 ka). The lithology is dominated sands with minor silts and gravels that are largely unconsolidated. The stratigraphy can be subdivided into five geologic units that can be mapped throughout the trench. Four of the units were deposited by the Missoula floods and the youngest consists of windblown sand and silt. The sediment has little moisture and is consistent with that observed in the characterization boreholes. The sedimentary layers are flat lying and there are no faults or folds present. Two clastic dikes were encountered, one along the west wall and one that can be traced from the north to the southwall. The north-south clastic dike nearly bifurcates the trench but the west wall clastic dike can not be traced very far east into the trench. The classic dikes consist mainly of sand with clay-lined walls. The sediment in the dikes is compacted to partly cemented and are more resistant than the layered sediments

  4. Report of the Workshop on Petascale Systems Integration for LargeScale Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William T.C.; Walter, Howard; New, Gary; Engle, Tom; Pennington, Rob; Comes, Brad; Bland, Buddy; Tomlison, Bob; Kasdorf, Jim; Skinner, David; Regimbal, Kevin

    2007-10-01

    There are significant issues regarding Large Scale System integration that are not being addressed in other forums such as current research portfolios or vendor user groups. Unfortunately, the issues in the area of large-scale system integration often fall into a netherworld; not research, not facilities, not procurement, not operations, not user services. Taken together, these issues along with the impact of sub-optimal integration technology means the time required to deploy, integrate and stabilize large scale system may consume up to 20 percent of the useful life of such systems. Improving the state of the art for large scale systems integration has potential to increase the scientific productivity of these systems. Sites have significant expertise, but there are no easy ways to leverage this expertise among them . Many issues inhibit the sharing of information, including available time and effort, as well as issues with sharing proprietary information. Vendors also benefit in the long run from the solutions to issues detected during site testing and integration. There is a great deal of enthusiasm for making large scale system integration a full-fledged partner along with the other major thrusts supported by funding agencies in the definition, design, and use of a petascale systems. Integration technology and issues should have a full 'seat at the table' as petascale and exascale initiatives and programs are planned. The workshop attendees identified a wide range of issues and suggested paths forward. Pursuing these with funding opportunities and innovation offers the opportunity to dramatically improve the state of large scale system integration.

  5. Determinants of facility readiness for integration of family planning with HIV testing and counseling services: evidence from the Tanzania service provision assessment survey, 2014-2015.

    Science.gov (United States)

    Bintabara, Deogratius; Nakamura, Keiko; Seino, Kaoruko

    2017-12-22

    Global policy reports, national frameworks, and programmatic tools and guidance emphasize the integration of family planning and HIV testing and counseling services to ensure universal access to reproductive health care and HIV prevention. However, the status of integration between these two services in Tanzanian health facilities is unclear. This study examined determinants of facility readiness for integration of family planning with HIV testing and counseling services in Tanzania. Data from the 2014-2015 Tanzania Service Provision Assessment Survey were analyzed. Facilities were considered ready for integration of family planning with HIV testing and counseling services if they scored ≥ 50% on both family planning and HIV testing and counseling service readiness indices as identified by the World Health Organization. All analyses were adjusted for clustering effects, and estimates were weighted to correct for non-responses and disproportionate sampling. Descriptive, bivariate, and multivariate logistic regression analyses were performed. A total of 1188 health facilities were included in the study. Of all of the health facilities, 915 (77%) reported offering both family planning and HIV testing and counseling services, while only 536 (45%) were considered ready to integrate these two services. Significant determinants of facility readiness for integrating these two services were being government owned [AOR = 3.2; 95%CI, 1.9-5.6], having routine management meetings [AOR = 1.9; 95%CI, 1.1-3.3], availability of guidelines [AOR = 3.8; 95%CI, 2.4-5.8], in-service training of staff [AOR = 2.6; 95%CI, 1.3-5.2], and availability of laboratories for HIV testing [AOR = 17.1; 95%CI, 8.2-35.6]. The proportion of facility readiness for the integration of family planning with HIV testing and counseling in Tanzania is unsatisfactory. The Ministry of Health should distribute and ensure constant availability of guidelines, availability of rapid diagnostic

  6. Validation of an integral conceptual model of frailty in older residents of assisted living facilities

    NARCIS (Netherlands)

    Gobbens, R.J.J.; Krans, A.; van Assen, M.A.L.M.

    2015-01-01

    Objective The aim of this cross-sectional study was to examine the validity of an integral model of the associations between life-course determinants, disease(s), frailty, and adverse outcomes in older persons who are resident in assisted living facilities. Methods Between June 2013 and May 2014

  7. Validation of an integral conceptual model of frailty in older residents of assisted living facilities

    NARCIS (Netherlands)

    Gobbens, Robbert J J; Krans, Anita; van Assen, Marcel A L M

    2015-01-01

    Objective: The aim of this cross-sectional study was to examine the validity of an integral model of the associations between life-course determinants, disease(s), frailty, and adverse outcomes in older persons who are resident in assisted living facilities. Methods: Between June 2013 and May 2014

  8. An integrated prediction and optimization model of biogas production system at a wastewater treatment facility.

    Science.gov (United States)

    Akbaş, Halil; Bilgen, Bilge; Turhan, Aykut Melih

    2015-11-01

    This study proposes an integrated prediction and optimization model by using multi-layer perceptron neural network and particle swarm optimization techniques. Three different objective functions are formulated. The first one is the maximization of methane percentage with single output. The second one is the maximization of biogas production with single output. The last one is the maximization of biogas quality and biogas production with two outputs. Methane percentage, carbon dioxide percentage, and other contents' percentage are used as the biogas quality criteria. Based on the formulated models and data from a wastewater treatment facility, optimal values of input variables and their corresponding maximum output values are found out for each model. It is expected that the application of the integrated prediction and optimization models increases the biogas production and biogas quality, and contributes to the quantity of electricity production at the wastewater treatment facility. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. The management of mechanical integrity inspections at small-sized 'Seveso' facilities

    International Nuclear Information System (INIS)

    Bragatto, Paolo A.; Pittiglio, Paolo; Ansaldi, Silvia

    2009-01-01

    The mechanical integrity (MI) of equipment has been controlled at all industrial facilities for many decades. Control methods and intervals are regulated by laws or codes and best practices. In European countries, the legislations implementing the Seveso Directives on the control of major accident hazards require the owner of establishments where hazardous chemicals are handled, to implement a safety management system (SMS). MI controls should be an integral part of the SMS. At large establishments this goal is achieved by adopting the RBI method, but in small-sized establishments with a limited budget and scanty personnel, a heuristic approach is more suitable. This paper demonstrates the feasibility and advantages of integrating SMS and MI by means of a simple method that includes a few basic concepts of RBI without additional costs for operator. This method, supported by a software tool, is resilient as it functions effectively in spite of eventual budget reductions and personnel turnover. The results of MI controls can also be exploited to monitor equipment condition and demonstrate the adequacy of technical systems to the Competent Authorities (CA). Furthermore, the SMS can 'capture' knowledge resulting from MI experience and exploit it for a better understanding of risk

  10. HPCAT: an integrated high-pressure synchrotron facility at the Advanced Photon Source

    International Nuclear Information System (INIS)

    Shen, Guoyin; Chow, Paul; Xiao, Yuming; Sinogeikin, Stanislav; Meng, Yue; Yang, Wenge; Liermann, Hans-Peter; Shebanova, Olga; Rod, Eric; Bommannavar, Arunkumar; Mao, Ho-Kwang

    2008-01-01

    The high pressure collaborative access team (HPCAT) was established to advance cutting edge, multidisciplinary, high-pressure (HP) science and technology using synchrotron radiation at sector 16 of the Advanced Photon Source of Argonne National Laboratory. The integrated HPCAT facility has established four operating beamlines in nine hutches. Two beamlines are split in energy space from the insertion device (16ID) line, whereas the other two are spatially divided into two fans from the bending magnet (16BM) line. An array of novel X-ray diffraction and spectroscopic techniques has been integrated with HP and extreme temperature instrumentation at HPCAT. With a multidisciplinary approach and multi-institution collaborations, the HP program at the HPCAT has been enabling myriad scientific breakthroughs in HP physics, chemistry, materials, and Earth and planetary sciences.

  11. Conjunctive operation of river facilities for integrated water resources management in Korea

    Directory of Open Access Journals (Sweden)

    H. Kim

    2016-10-01

    Full Text Available With the increasing trend of water-related disasters such as floods and droughts resulting from climate change, the integrated management of water resources is gaining importance recently. Korea has worked towards preventing disasters caused by floods and droughts, managing water resources efficiently through the coordinated operation of river facilities such as dams, weirs, and agricultural reservoirs. This has been pursued to enable everyone to enjoy the benefits inherent to the utilization of water resources, by preserving functional rivers, improving their utility and reducing the degradation of water quality caused by floods and droughts. At the same time, coordinated activities are being conducted in multi-purpose dams, hydro-power dams, weirs, agricultural reservoirs and water use facilities (featuring a daily water intake of over 100 000 m3 day−1 with the purpose of monitoring the management of such facilities. This is being done to ensure the protection of public interest without acting as an obstacle to sound water management practices. During Flood Season, each facilities contain flood control capacity by limited operating level which determined by the Regulation Council in advance. Dam flood discharge decisions are approved through the flood forecasting and management of Flood Control Office due to minimize flood damage for both upstream and downstream. The operational plan is implemented through the council's predetermination while dry season for adequate quantity and distribution of water.

  12. Integrating supervision, control and data acquisition—The ITER Neutral Beam Test Facility experience

    Energy Technology Data Exchange (ETDEWEB)

    Luchetta, A., E-mail: adriano.luchetta@igi.cnr.it; Manduchi, G.; Taliercio, C.; Breda, M.; Capobianco, R.; Molon, F.; Moressa, M.; Simionato, P.; Zampiva, E.

    2016-11-15

    Highlights: • The paper describes the experience gained in the integration of different systems for the control and data acquisition system of the ITER Neutral Beam Test Facility. • It describes the way the different frameworks have been integrated. • It reports some lessons learnt during system integration. • It reports some authors’ considerations about the development the ITER CODAC. - Abstract: The ITER Neutral Beam (NBI) Test Facility, under construction in Padova, Italy consists in the ITER full scale ion source for the heating neutral beam injector, referred to as SPIDER, and the full size prototype injector, referred to as MITICA. The Control and Data Acquisition System (CODAS) for SPIDER has been developed and is going to be in operation in 2016. The system is composed of four main components: Supervision, Slow Control, Fast Control and Data Acquisition. These components interact with each other to carry out the system operation and, since they represent a common pattern in fusion experiments, software frameworks have been used for each (set of) component. In order to reuse as far as possible the architecture developed for SPIDER, it is important to clearly define the boundaries and the interfaces among the system components so that the implementation of any component can be replaced without affecting the overall architecture. This work reports the experience gained in the development of SPIDER components, highlighting the importance in the definition of generic interfaces among component, showing how the specific solutions have been adapted to such interfaces and suggesting possible approaches for the development of other ITER subsystems.

  13. Integrating supervision, control and data acquisition—The ITER Neutral Beam Test Facility experience

    International Nuclear Information System (INIS)

    Luchetta, A.; Manduchi, G.; Taliercio, C.; Breda, M.; Capobianco, R.; Molon, F.; Moressa, M.; Simionato, P.; Zampiva, E.

    2016-01-01

    Highlights: • The paper describes the experience gained in the integration of different systems for the control and data acquisition system of the ITER Neutral Beam Test Facility. • It describes the way the different frameworks have been integrated. • It reports some lessons learnt during system integration. • It reports some authors’ considerations about the development the ITER CODAC. - Abstract: The ITER Neutral Beam (NBI) Test Facility, under construction in Padova, Italy consists in the ITER full scale ion source for the heating neutral beam injector, referred to as SPIDER, and the full size prototype injector, referred to as MITICA. The Control and Data Acquisition System (CODAS) for SPIDER has been developed and is going to be in operation in 2016. The system is composed of four main components: Supervision, Slow Control, Fast Control and Data Acquisition. These components interact with each other to carry out the system operation and, since they represent a common pattern in fusion experiments, software frameworks have been used for each (set of) component. In order to reuse as far as possible the architecture developed for SPIDER, it is important to clearly define the boundaries and the interfaces among the system components so that the implementation of any component can be replaced without affecting the overall architecture. This work reports the experience gained in the development of SPIDER components, highlighting the importance in the definition of generic interfaces among component, showing how the specific solutions have been adapted to such interfaces and suggesting possible approaches for the development of other ITER subsystems.

  14. Design and first integral test of MUSE facility in ALPHA program

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyun-sun; Yamano, Norihiro; Maruyama, Yu; Moriyama, Kiyofumi; Kudo, Tamotsu; Yang, Yanhua; Sugimoto, Jun [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-03-01

    Vapor explosion (Steam explosion or energetic Fuel-Coolant Interaction) is a phenomenon in which a hot liquid rapidly releases its internal energy into a surrounding colder and more volatile liquid when these liquids come into a sudden contact. This rapid energy release leads to rapid vapor production within a timescale short compared to vapor expansion causes local pressurization similar to an explosion and eventually threatens the surroundings by dynamic pressures and the subsequent expansion. It has been recognized that the energetics of vapor explosions strongly depend on the initial mixing geometry established by the contact of hot and cold liquids. Therefore, a new program has been initiated to investigate the energetics of vapor explosions in various contact geometries; i.e., pouring, stratified, coolant and melt injection modes in a facility which is able to measure the energy conversion ratio and eventually to provide data to evaluate the mechanistic analytical models. In the report, this new facility, called MUSE (MUlti-configuration in Steam Explosions), and the results of the first integral test are described in detail. (author)

  15. A study on development of Pyro process integrated inactive demonstration facility

    International Nuclear Information System (INIS)

    Cho, I.; Lee, E.; Choung, W.; You, G.; Kim, H.

    2010-10-01

    Since 2007, the Pride (Pyro process integrated inactive demonstration facility) has been developed to demonstrate the integrated engineering-scale pyro processing using natural uranium with surrogate materials. In this paper, safety evaluation on hypothetical accident case is carried out to ensure the release of radioactivity being negligible to the environment and the performance of indoor argon flow for the argon cell has been investigated by means of CFD analysis. The worst accident case, even in the firing of the all uranium metal in argon cell, cause dose rate are negligible comparing to 0.25 Sv of effective dose rate to whole body or 3 Sv of equivalent dose rate to the thyroid preliminary CFD analyses show the temperature and velocity distribution of argon cell, and give the information to change the argon exchange rate and displace the argon supply or exhaust duct. CFD will allow design change and improvements in ventilation systems at lower cost. (Author)

  16. Vehicle-to-Grid Integration | Energy Systems Integration Facility | NREL

    Science.gov (United States)

    Vehicle-to-Grid Integration Vehicle-to-Grid Integration NREL's research stands at the forefront of vehicle charging station Our work focuses on building the infrastructure and integration needed for benefit each other. Electric Vehicles NREL's research on electric vehicle (EV) grid integration examines

  17. Oxy-Combustion Burner and Integrated Pollutant Removal Research and Development Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Mark Schoenfield; Manny Menendez; Thomas Ochs; Rigel Woodside; Danylo Oryshchyn

    2012-09-30

    A high flame temperature oxy-combustion test facility consisting of a 5 MWe equivalent test boiler facility and 20 KWe equivalent IPR® was constructed at the Hammond, Indiana manufacturing site. The test facility was operated natural gas and coal fuels and parametric studies were performed to determine the optimal performance conditions and generated the necessary technical data required to demonstrate the technologies are viable for technical and economic scale-up. Flame temperatures between 4930-6120F were achieved with high flame temperature oxy-natural gas combustion depending on whether additional recirculated flue gases are added to balance the heat transfer. For high flame temperature oxy-coal combustion, flame temperatures in excess of 4500F were achieved and demonstrated to be consistent with computational fluid dynamic modeling of the burner system. The project demonstrated feasibility and effectiveness of the Jupiter Oxygen high flame temperature oxy-combustion process with Integrated Pollutant Removal process for CCS and CCUS. With these technologies total parasitic power requirements for both oxygen production and carbon capture currently are in the range of 20% of the gross power output. The Jupiter Oxygen high flame temperature oxy-combustion process has been demonstrated at a Technology Readiness Level of 6 and is ready for commencement of a demonstration project.

  18. Application of Framework for Integrating Safety, Security and Safeguards (3Ss) into the Design Of Used Nuclear Fuel Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Badwan, Faris M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Demuth, Scott F [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-01-06

    Department of Energy’s Office of Nuclear Energy, Fuel Cycle Research and Development develops options to the current commercial fuel cycle management strategy to enable the safe, secure, economic, and sustainable expansion of nuclear energy while minimizing proliferation risks by conducting research and development focused on used nuclear fuel recycling and waste management to meet U.S. needs. Used nuclear fuel is currently stored onsite in either wet pools or in dry storage systems, with disposal envisioned in interim storage facility and, ultimately, in a deep-mined geologic repository. The safe management and disposition of used nuclear fuel and/or nuclear waste is a fundamental aspect of any nuclear fuel cycle. Integrating safety, security, and safeguards (3Ss) fully in the early stages of the design process for a new nuclear facility has the potential to effectively minimize safety, proliferation, and security risks. The 3Ss integration framework could become the new national and international norm and the standard process for designing future nuclear facilities. The purpose of this report is to develop a framework for integrating the safety, security and safeguards concept into the design of Used Nuclear Fuel Storage Facility (UNFSF). The primary focus is on integration of safeguards and security into the UNFSF based on the existing Nuclear Regulatory Commission (NRC) approach to addressing the safety/security interface (10 CFR 73.58 and Regulatory Guide 5.73) for nuclear power plants. The methodology used for adaptation of the NRC safety/security interface will be used as the basis for development of the safeguards /security interface and later will be used as the basis for development of safety and safeguards interface. Then this will complete the integration cycle of safety, security, and safeguards. The overall methodology for integration of 3Ss will be proposed, but only the integration of safeguards and security will be applied to the design of the

  19. What Is Energy Systems Integration? | Energy Systems Integration Facility |

    Science.gov (United States)

    NREL What Is Energy Systems Integration? What Is Energy Systems Integration? Energy systems integration (ESI) is an approach to solving big energy challenges that explores ways for energy systems to Research Community NREL is a founding member of the International Institute for Energy Systems Integration

  20. Energy Systems Integration News - October 2016 | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL October 2016 Energy Systems Integration News A monthly recap of the latest energy systems integration (ESI) developments at NREL and around the world. Subscribe Archives October Integration Facility's main control room. OMNETRIC Group Demonstrates a Distributed Control Hierarchy for

  1. INTEGRITY -- Integrated Human Exploration Mission Simulation Facility

    Science.gov (United States)

    Henninger, D.; Tri, T.; Daues, K.

    It is proposed to develop a high -fidelity ground facil ity to carry out long-duration human exploration mission simulations. These would not be merely computer simulations - they would in fact comprise a series of actual missions that just happen to stay on earth. These missions would include all elements of an actual mission, using actual technologies that would be used for the real mission. These missions would also include such elements as extravehicular activities, robotic systems, telepresence and teleoperation, surface drilling technology--all using a simulated planetary landscape. A sequence of missions would be defined that get progressively longer and more robust, perhaps a series of five or six missions over a span of 10 to 15 years ranging in durat ion from 180 days up to 1000 days. This high-fidelity ground facility would operate hand-in-hand with a host of other terrestrial analog sites such as the Antarctic, Haughton Crater, and the Arizona desert. Of course, all of these analog mission simulations will be conducted here on earth in 1-g, and NASA will still need the Shuttle and ISS to carry out all the microgravity and hypogravity science experiments and technology validations. The proposed missions would have sufficient definition such that definitive requirements could be derived from them to serve as direction for all the program elements of the mission. Additionally, specific milestones would be established for the "launch" date of each mission so that R&D programs would have both good requirements and solid milestones from which to build their implementation plans. Mission aspects that could not be directly incorporated into the ground facility would be simulated via software. New management techniques would be developed for evaluation in this ground test facility program. These new techniques would have embedded metrics which would allow them to be continuously evaluated and adjusted so that by the time the sequence of missions is completed

  2. Integrated Disposal Facility FY2010 Glass Testing Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Serne, R Jeffrey; Mattigod, Shas V.

    2010-09-30

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 × 105 m3 of glass (Puigh 1999). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 0.89 × 1018 Bq total activity) of long-lived radionuclides, principally 99Tc (t1/2 = 2.1 × 105), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessement (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2010 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses. The emphasis in FY2010 was the completing an evaluation of the most sensitive kinetic rate law parameters used to predict glass weathering, documented in Bacon and Pierce (2010), and transitioning from the use of the Subsurface Transport Over Reactive Multi-phases to Subsurface Transport Over Multiple Phases computer code for near-field calculations. The FY2010 activities also consisted of developing a Monte Carlo and Geochemical Modeling framework that links glass composition to alteration phase formation by 1) determining the structure of unreacted and reacted glasses for use as input information into Monte Carlo

  3. Integrated Disposal Facility FY2010 Glass Testing Summary Report

    International Nuclear Information System (INIS)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Serne, R. Jeffrey; Mattigod, Shas V.

    2010-01-01

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 A - 105 m 3 of glass (Puigh 1999). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 0.89 A - 1018 Bq total activity) of long-lived radionuclides, principally 99Tc (t1/2 = 2.1 A - 105), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessement (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2010 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses. The emphasis in FY2010 was the completing an evaluation of the most sensitive kinetic rate law parameters used to predict glass weathering, documented in Bacon and Pierce (2010), and transitioning from the use of the Subsurface Transport Over Reactive Multi-phases to Subsurface Transport Over Multiple Phases computer code for near-field calculations. The FY2010 activities also consisted of developing a Monte Carlo and Geochemical Modeling framework that links glass composition to alteration phase formation by (1) determining the structure of unreacted and reacted glasses for use as input information into Monte Carlo

  4. EPA Facility Registry System (FRS): NCES

    Science.gov (United States)

    This web feature service contains location and facility identification information from EPA's Facility Registry System (FRS) for the subset of facilities that link to the National Center for Education Statistics (NCES). The primary federal database for collecting and analyzing data related to education in the United States and other Nations, NCES is located in the U.S. Department of Education, within the Institute of Education Sciences. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA00e2??s national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NCES school facilities once the NCES data has been integrated into the FRS database. Additional information on FRS is available at the EPA website http://www.epa.gov/enviro/html/fii/index.html.

  5. Adequacy of power-to-volume scaling philosophy to simulate natural circulation in Integral Test Facilities

    International Nuclear Information System (INIS)

    Nayak, A.K.; Vijayan, P.K.; Saha, D.; Venkat Raj, V.; Aritomi, Masanori

    1998-01-01

    Theoretical and experimental investigations were carried out to study the adequacy of power-to-volume scaling philosophy for the simulation of natural circulation and to establish the scaling philosophy applicable for the design of the Integral Test Facility (ITF-AHWR) for the Indian Advanced Heavy Water Reactor (AHWR). The results indicate that a reduction in the flow channel diameter of the scaled facility as required by the power-to-volume scaling philosophy may affect the simulation of natural circulation behaviour of the prototype plants. This is caused by the distortions due to the inability to simulate the frictional resistance of the scaled facility. Hence, it is recommended that the flow channel diameter of the scaled facility should be as close as possible to the prototype. This was verified by comparing the natural circulation behaviour of a prototype 220 MWe Indian PHWR and its scaled facility (FISBE-1) designed based on power-to-volume scaling philosophy. It is suggested from examinations using a mathematical model and a computer code that the FISBE-1 simulates the steady state and the general trend of transient natural circulation behaviour of the prototype reactor adequately. Finally the proposed scaling method was applied for the design of the ITF-AHWR. (author)

  6. Integration of Traditional Birth Attendants into Prevention of Mother-to-Child Transmission at Primary Health Facilities in Kaduna, North-West Nigeria.

    Science.gov (United States)

    Nsirim, Reward O; Iyongo, Joseph A; Adekugbe, Olayinka; Ugochuku, Maureen

    2015-03-31

    One of the fundamental challenges to implementing successful prevention of mother-to-child transmission (PMTCT) programs in Nigeria is the uptake of PMTCT services at health facilities. Several issues usually discourage many pregnant women from receiving antenatal care services at designated health facilities within their communities. The CRS Nigeria PMTCT Project funded by the Global Fund in its Round 9 Phase 1 in Nigeria, sought to increase demand for HIV counseling and testing services for pregnant women at 25 supported primary health centers (PHCs) in Kaduna State, North-West Nigeria by integrating traditional birth attendants (TBAs) across the communities where the PHCs were located into the project. Community dialogues were held with the TBAs, community leaders and women groups. These dialogues focused on modes of mother to child transmission of HIV and the need for TBAs to refer their clients to PHCs for testing. Subsequently, data on number of pregnant women who were counseled, tested and received results was collected on a monthly basis from the 25 facilities using the national HIV/AIDS tools. Prior to this integration, the average number of pregnant women that were counseled, tested and received results was 200 pregnant women across all the 25 health facilities monthly. After the integration of TBAs into the program, the number of pregnant women that were counseled, tested and received results kept increasing month after month up to an average of 1500 pregnant women per month across the 25 health facilities. TBAs can thus play a key role in improving service uptake and utilization for pregnant women at primary health centers in the community - especially in the context of HIV/AIDS. They thus need to be integrated, rather than alienated, from primary healthcare service delivery.

  7. Integration of traditional birth attendants into prevention of mother-to-child transmission at primary health facilities in Kaduna, North-West Nigeria

    Directory of Open Access Journals (Sweden)

    Reward O. Nsirim

    2016-05-01

    Full Text Available One of the fundamental challenges to implementing successful prevention of mother-tochild transmission (PMTCT programs in Nigeria is the uptake of PMTCT services at health facilities. Several issues usually discourage many pregnant women from receiving antenatal care services at designated health facilities within their communities. The CRS Nigeria PMTCT Project funded by the Global Fund in its Round 9 Phase 1 in Nigeria, sought to increase demand for HIV counseling and testing services for pregnant women at 25 supported primary health centers (PHCs in Kaduna State, North-West Nigeria by integrating traditional birth attendants (TBAs across the communities where the PHCs were located into the project. Community dialogues were held with the TBAs, community leaders and women groups. These dialogues focused on modes of mother to child transmission of HIV and the need for TBAs to refer their clients to PHCs for testing. Subsequently, data on number of pregnant women who were counseled, tested and received results was collected on a monthly basis from the 25 facilities using the national HIV/AIDS tools. Prior to this integration, the average number of pregnant women that were counseled, tested and received results was 200 pregnant women across all the 25 health facilities monthly. After the integration of TBAs into the program, the number of pregnant women that were counseled, tested and received results kept increasing month after month up to an average of 1500 pregnant women per month across the 25 health facilities. TBAs can thus play a key role in improving service uptake and utilization for pregnant women at primary health centers in the community – especially in the context of HIV/AIDS. They thus need to be integrated, rather than alienated, from primary healthcare service delivery.

  8. PWR station blackout transient simulation in the INER integral system test facility

    International Nuclear Information System (INIS)

    Liu, T.J.; Lee, C.H.; Hong, W.T.; Chang, Y.H.

    2004-01-01

    Station blackout transient (or TMLB' scenario) in a pressurized water reactor (PWR) was simulated using the INER Integral System Test Facility (IIST) which is a 1/400 volumetrically-scaled reduce-height and reduce-pressure (RHRP) simulator of a Westinghouse three-loop PWR. Long-term thermal-hydraulic responses including the secondary boil-off and the subsequent primary saturation, pressurization and core uncovery were simulated based on the assumptions of no offsite and onsite power, feedwater and operator actions. The results indicate that two-phase discharge is the major depletion mode since it covers 81.3% of the total amount of the coolant inventory loss. The primary coolant inventory has experienced significant re-distribution during a station blackout transient. The decided parameter to avoid the core overheating is not the total amount of the coolant inventory remained in the primary core cooling system but only the part of coolant left in the pressure vessel. The sequence of significant events during transient for the IIST were also compared with those of the ROSA-IV large-scale test facility (LSTF), which is a 1/48 volumetrically-scaled full-height and full-pressure (FHFP) simulator of a PWR. The comparison indicates that the sequence and timing of these events during TMLB' transient studied in the RHRP IIST facility are generally consistent with those of the FHFP LSTF. (author)

  9. Integrated leak rate test of the FFTF [Fast Flux Test Facility] containment vessel

    International Nuclear Information System (INIS)

    Grygiel, M.L.; Davis, R.H.; Polzin, D.L.; Yule, W.D.

    1987-04-01

    The third integrated leak rate test (ILRT) performed at the Fast Flux Test Facility (FFTF) demonstrated that effective leak rate measurements could be obtained at a pressure of 2 psig. In addition, innovative data reduction methods demonstrated the ability to accurately account for diurnal variations in containment pressure and temperature. Further development of methods used in this test indicate significant savings in the time and effort required to perform an ILRT on Liquid Metal Reactor Systems with consequent reduction in test costs

  10. Current state of the construction of an integrated test facility for hydrogen risk

    Energy Technology Data Exchange (ETDEWEB)

    Na, Young Su; Hong, Seong-Ho; Hong, Seong-Wan [KAERI, Daejeon (Korea, Republic of)

    2015-05-15

    Experimental research on hydrogen as a combustible gas is important for an assessment of the integrity of a containment building under a severe accident. The Korea Atomic Energy Research Institute (KAERI) is preparing a large-scaled test facility, called SPARC (SPray-Aerosol-Recombiner-Combustion), to estimate the hydrogen behavior such as the distribution, combustion and mitigation. This paper introduces the experimental research activity on hydrogen risk, which was presented at International Congress on Advances in Nuclear Power Plants (ICAPP) this year. The KAERI is preparing a test facility, called SPARC (SPray-Aerosol-Recombiner-Combustion test facility), for an assessment of the hydrogen risk. In the SPARC, hydrogen behavior such as mixing with steam and air, distribution, and combustion in the containment atmosphere will be observed. The SPARC consists of a pressure vessel with a 9.5 m height and 3.4 m in diameter and the operating system to control the thermal hydraulic conditions up to 1.5 MPa at 453 K in a vessel. The temperature, pressure, and gas concentration at various locations will be measured to estimate the atmospheric behavior in a vessel. To install the SPARC, an experimental building, called LIFE (Laboratory for Innovative mitigation of threats from Fission products and Explosion), was constructed at the KAERI site. LIFE has an area of 480 m''2 and height of 18.6 m, and it was designed by considering the experimental safety and specification of a large-sized test facility.

  11. Integration of the PHIN RF Gun into the CLIC Test Facility

    CERN Document Server

    Döbert, Steffen

    2006-01-01

    CERN is a collaborator within the European PHIN project, a joint research activity for Photo injectors within the CARE program. A deliverable of this project is an rf Gun equipped with high quantum efficiency Cs2Te cathodes and a laser to produce the nominal beam for the CLIC Test Facility (CTF3). The nominal beam for CTF3 has an average current of 3.5 A, 1.5 GHz bunch repetition frequency and a pulse length of 1.5 ìs (2332 bunches) with quite tight stability requirements. In addition a phase shift of 180 deg is needed after each train of 140 ns for the special CLIC combination scheme. This rf Gun will be tested at CERN in fall 2006 and shall be integrated as a new injector into the CTF3 linac, replacing the existing injector consisting of a thermionic gun and a subharmonic bunching system. The paper studies the optimal integration into the machine trying to optimize transverse and longitudinal phase space of the beam while respecting the numerous constraints of the existing accelerator. The presented scheme...

  12. Facility Registry Service (FRS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Facility Registry Service (FRS) provides an integrated source of comprehensive (air, water, and waste) environmental information about facilities across EPA,...

  13. An Integration Testing Facility for the CERN Accelerator Controls System

    CERN Document Server

    Stapley, N; Bau, J C; Deghaye, S; Dehavay, C; Sliwinski, W; Sobczak, M

    2009-01-01

    A major effort has been invested in the design, development, and deployment of the LHC Control System. This large control system is made up of a set of core components and dependencies, which although tested individually, are often not able to be tested together on a system capable of representing the complete control system environment, including hardware. Furthermore this control system is being adapted and applied to CERN's whole accelerator complex, and in particular for the forthcoming renovation of the PS accelerators. To ensure quality is maintained as the system evolves, and toimprove defect prevention, the Controls Group launched a project to provide a dedicated facility for continuous, automated, integration testing of its core components to incorporate into its production process. We describe the project, initial lessons from its application, status, and future directions.

  14. Armament Technology Facility (ATF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Armament Technology Facility is a 52,000 square foot, secure and environmentally-safe, integrated small arms and cannon caliber design and evaluation facility....

  15. Integrated economics

    International Nuclear Information System (INIS)

    Bratton, T.J.

    1992-01-01

    This article offers ideas for evaluating integrated solid waste management systems through the use of a conceptual cost overview. The topics of the article include the integrated solid waste management system; making assumptions about community characteristics, waste generation rates, waste collection responsibility, integrated system components, sizing and economic life of system facilities, system implementation schedule, facility ownership, and system administration; integrated system costs; integrated system revenues; system financing; cost projections; and making decisions

  16. Final deactivation project report on the Integrated Process Demonstration Facility, Building 7602 Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S ampersand M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed

  17. Vehicle Thermal Management Facilities | Transportation Research | NREL

    Science.gov (United States)

    Integration Facility The Vehicle Testing and Integration Facility features a pad to conduct vehicle thermal station next to the pad provides a continuous data stream on temperature, humidity, wind speed, and solar

  18. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  19. Institutionalizing Safeguards By Design for Nuclear Facilities

    International Nuclear Information System (INIS)

    Morgan, James B.; Kovacic, Donald N.; Whitaker, J. Michael

    2008-01-01

    Safeguards for nuclear facilities can be significantly improved by developing and implementing methodologies for integrating proliferation resistance into the design of new facilities. This paper proposes a method to systematically analyze a facility's processes, systems, equipment, structures and management controls to ensure that all relevant proliferation scenarios that could potentially result in unacceptable consequences have been identified, evaluated and mitigated. This approach could be institutionalized into a country's regulatory structure similar to the way facilities are licensed to operate safely and are monitored through inspections and incident reporting to ensure compliance with domestic and international safeguards. Furthermore, taking credit for existing systems and equipment that have been analyzed and approved to assure a facility's reliable and safe operations will reduce the overall cost of implementing intrinsic and extrinsic proliferation-resistant features. The ultimate goal is to integrate safety, reliability, security and safeguards operations into the design of new facilities to effectively and efficiently prevent diversion, theft and misuse of nuclear material and sensitive technologies at both the facility and state level. To facilitate this approach at the facility level, this paper discusses an integrated proliferation resistance analysis (IPRA) process. If effectively implemented, this integrated approach will also facilitate the application of International Atomic Energy Agency (IAEA) safeguards

  20. Integrated disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2007-09-01

    This report summarizes the first year survival of sagebrush seedlings planted as compensatory mitigation for the Integrated Disposal Facility Project. Approximately 42,600 bare root seedlings and 26,000 pluglings were planted at a mitigation site along Army Loop Road in February 2007. Initial baseline monitoring occurred in March 2007, and first summer survival was assessed in September 2007. Overall survival was 19%, with bare root survival being marginally better than pluglings (21% versus 14%). Likely major factors contributing to low survival were late season planting and insufficient soil moisture during seedling establishment.

  1. CSNI Integral Test Facility Matrices for Validation of Best-Estimate Thermal-Hydraulic Computer Codes

    International Nuclear Information System (INIS)

    Glaeser, H.

    2008-01-01

    Internationally agreed Integral Test Facility (ITF) matrices for validation of realistic thermal hydraulic system computer codes were established. ITF development is mainly for Pressurised Water Reactors (PWRs) and Boiling Water Reactors (BWRs). A separate activity was for Russian Pressurised Water-cooled and Water-moderated Energy Reactors (WWER). Firstly, the main physical phenomena that occur during considered accidents are identified, test types are specified, and test facilities suitable for reproducing these aspects are selected. Secondly, a list of selected experiments carried out in these facilities has been set down. The criteria to achieve the objectives are outlined. In this paper some specific examples from the ITF matrices will also be provided. The matrices will be a guide for code validation, will be a basis for comparisons of code predictions performed with different system codes, and will contribute to the quantification of the uncertainty range of code model predictions. In addition to this objective, the construction of such a matrix is an attempt to record information which has been generated around the world over the last years, so that it is more accessible to present and future workers in that field than would otherwise be the case.

  2. Development of a Remote Handling System in an Integrated Pyroprocessing Facility

    Directory of Open Access Journals (Sweden)

    Hyo Jik Lee

    2013-10-01

    Full Text Available Over the course of a decade-long research programme, the Korea Atomic Energy Research Institute (KAERI has developed several remote handling systems for use in pyroprocessing research facilities. These systems are now used successfully for the operation and maintenance of processing equipment. The most recent remote handling system is the bridge-transported dual arm servo-manipulator system (BDSM, which is used for remote operation at the world's largest pyroprocess integrated inactive demonstration facility (PRIDE. Accurate and reliable servo-control is the basic requirement for the BDSM to accomplish any given tasks successfully in a hotcell environment. To achieve this end, the hardware and software of a digital signal processor-based remote control system were fully custom-developed and implemented to control the BDSM. To reduce the residual vibration of the BDSM, several input profiles, including input shaping, were carefully chosen and evaluated. Furthermore, a time delay controller was employed to achieve good tracking performance and systematic gain tuning. The experimental results demonstrate that the applied control algorithms are more effective than conventional approaches. The BDSM successfully completed its performance tests at a mock-up and was installed at PRIDE for real-world operation. The remote handling system at KAERI is expected to advance the actualization of pyroprocessing.

  3. Integration of knowledge management system for the decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    Iguchi, Yukihiro; Yanagihara, Satoshi

    2016-01-01

    The decommissioning of a nuclear facility is a long term project, handling information which begins from the design, construction and operation. Moreover, the decommissioning project is likely to be extended because of the lack of the waste disposal site especially in Japan. In this situation, because the transfer of knowledge and education to the next generation is a crucial issue, integration and implementation of a system for knowledge management is necessary in order to solve it. For this purpose, the total system of decommissioning knowledge management system (KMS) is proposed. In this system, we have to arrange, organize and systematize the data and information of the plant design, maintenance history, trouble events, waste management records etc. The collected data, information and records should be organized by computer support system e.g. data base system. It becomes a base of the explicit knowledge. Moreover, measures of extracting tacit knowledge from retiring employees are necessary. The experience of the retirees should be documented as much as possible through effective questionnaire or interview process. The integrated knowledge mentioned above should be used for the planning, implementation of dismantlement or education for the future generation. (author)

  4. X-ray facility for the ground calibration of the X-ray monitor JEM-X on board INTEGRAL

    DEFF Research Database (Denmark)

    Loffredo, G.; Pelliciari, C.; Frontera, F.

    2003-01-01

    We describe the X-ray facility developed for the calibration of the X-ray monitor JEM-X on board the INTEGRAL satellite. The apparatus allowed the scanning of the detector geometric area with a pencil beam of desired energy over the major part of the passband of the instrument. The monochromatic...

  5. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  6. Integrated doses calculation in evacuation scenarios of the neutron generator facility at Missouri S&T

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Manish K.; Alajo, Ayodeji B., E-mail: alajoa@mst.edu

    2016-08-11

    Any source of ionizing radiations could lead to considerable dose acquisition to individuals in a nuclear facility. Evacuation may be required when elevated levels of radiation is detected within a facility. In this situation, individuals are more likely to take the closest exit. This may not be the most expedient decision as it may lead to higher dose acquisition. The strategy followed in preventing large dose acquisitions should be predicated on the path that offers least dose acquisition. In this work, the neutron generator facility at Missouri University of Science and Technology was analyzed. The Monte Carlo N-Particle (MCNP) radiation transport code was used to model the entire floor of the generator's building. The simulated dose rates in the hallways were used to estimate the integrated doses for different paths leading to exits. It was shown that shortest path did not always lead to minimum dose acquisition and the approach was successful in predicting the expedient path as opposed to the approach of taking the nearest exit.

  7. DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 1 of 2: Technical standard

    International Nuclear Information System (INIS)

    1998-05-01

    This Department of Energy (DOE) technical standard (referred to as the Standard) provides guidance for integrating and enhancing worker, public, and environmental protection during facility disposition activities. It provides environment, safety, and health (ES and H) guidance to supplement the project management requirements and associated guidelines contained within DOE O 430.1A, Life-Cycle Asset Management (LCAM), and amplified within the corresponding implementation guides. In addition, the Standard is designed to support an Integrated Safety Management System (ISMS), consistent with the guiding principles and core functions contained in DOE P 450.4, Safety Management System Policy, and discussed in DOE G 450.4-1, Integrated Safety Management System Guide. The ISMS guiding principles represent the fundamental policies that guide the safe accomplishment of work and include: (1) line management responsibility for safety; (2) clear roles and responsibilities; (3) competence commensurate with responsibilities; (4) balanced priorities; (5) identification of safety standards and requirements; (6) hazard controls tailored to work being performed; and (7) operations authorization. This Standard specifically addresses the implementation of the above ISMS principles four through seven, as applied to facility disposition activities

  8. Integration of Biosafety into Core Facility Management

    Science.gov (United States)

    Fontes, Benjamin

    2013-01-01

    This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core laboratory for biosafety professionals. Elevating awareness of biohazards and the biosafety regulatory landscape among core facility operators is essential for the establishment of a framework for both project and material risk assessment. The goal of the biohazard risk assessment process is to identify the biohazard risk management parameters to conduct the procedure safely and in compliance with applicable regulations. An evaluation of the containment, protective equipment and work practices for the procedure for the level of risk identified is facilitated by the establishment of a core facility registration form for work with biohazards and other biological materials with potential risk. The final step in the biocontainment process is the assumption of Principal Investigator role with full responsibility for the structure of the site-specific biosafety program plan by core facility leadership. The presentation will provide example biohazard protocol reviews and accompanying containment measures for core laboratories at Yale University.

  9. The Utility of Mass Violence

    Science.gov (United States)

    2009-09-01

    antibiotic treatment, the C-dif bacteria will overpopulate and overrun the intestines and colon. This infestation causes weakness, dehydration, fever...intervened on several fronts. They curbed the Ottoman’s trade monopoly and established their own naval routes to Asia . Vast imports of Spanish silver

  10. Distributed Energy Resources Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NREL's Distributed Energy Resources Test Facility (DERTF) is a working laboratory for interconnection and systems integration testing. This state-of-the-art facility...

  11. 242-A Evaporator crystallizer facility integrated annual safety appraisal

    International Nuclear Information System (INIS)

    1991-01-01

    This report provides the results of the Fiscal Year (FY) 1991 Annual Integrated Safety Appraisal of the 242-A Evaporator Crystallizer Facility in the Hanford 200 East Area. The appraisal was conducted in December 1990 and January 1991, by the Waste Tank Safety Assurance (WTSA) organizations in conjunction with Radiological Engineering, Criticality Safety, Packaging and Shipping Safety, Emergency Preparedness, Environmental Compliance, and Quality Assurance. Reports of these eight organizations are presented as Sections 2 through 7 of this report. The purpose of the appraisal was to verify that the 242-A Evaporator meets US Department of Energy (DOE) and Westinghouse Hanford Company (WHC) requirements and current industry standards of good practice for the areas being appraised. A further purpose was to identify areas in which program effectiveness could be improved. In accordance with the guidance of WHC Management Requirements and Procedures (MRP)5.6, previously identified deficiencies which are being resolved by line management were not repeated as Findings or Observations unless progress or intended disposition was considered to be unsatisfactory

  12. NN-SITE: A remote monitoring testbed facility

    International Nuclear Information System (INIS)

    Kadner, S.; White, R.; Roman, W.; Sheely, K.; Puckett, J.; Ystesund, K.

    1997-01-01

    DOE, Aquila Technologies, LANL and SNL recently launched collaborative efforts to create a Non-Proliferation Network Systems Integration and Test (NN-Site, pronounced N-Site) facility. NN-Site will focus on wide area, local area, and local operating level network connectivity including Internet access. This facility will provide thorough and cost-effective integration, testing and development of information connectivity among diverse operating systems and network topologies prior to full-scale deployment. In concentrating on instrument interconnectivity, tamper indication, and data collection and review, NN-Site will facilitate efforts of equipment providers and system integrators in deploying systems that will meet nuclear non-proliferation and safeguards objectives. The following will discuss the objectives of ongoing remote monitoring efforts, as well as the prevalent policy concerns. An in-depth discussion of the Non-Proliferation Network Systems Integration and Test facility (NN-Site) will illuminate the role that this testbed facility can perform in meeting the objectives of remote monitoring efforts, and its potential contribution in promoting eventual acceptance of remote monitoring systems in facilities worldwide

  13. Development of a model forecasting Dermanyssus gallinae's population dynamics for advancing Integrated Pest Management in laying hen facilities

    NARCIS (Netherlands)

    Mul, Monique F.; Riel, van Johannes; Roy, Lise; Zoons, Johan; Andre, Geert; George, David R.; Meerburg, Bastiaan G.; Dicke, Marcel; Mourik, van Simon; Groot Koerkamp, Peter W.G.

    2017-01-01

    The poultry red mite, Dermanyssus gallinae, is the most significant pest of egg laying hens in many parts of the world. Control of D. gallinae could be greatly improved with advanced Integrated Pest Management (IPM) for D. gallinae in laying hen facilities. The development of a model forecasting

  14. Secondary Waste Cementitious Waste Form Data Package for the Integrated Disposal Facility Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Cantrell, Kirk J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westsik, Joseph H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Serne, R Jeffrey [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Um, Wooyong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cozzi, Alex D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-16

    A review of the most up-to-date and relevant data currently available was conducted to develop a set of recommended values for use in the Integrated Disposal Facility (IDF) performance assessment (PA) to model contaminant release from a cementitious waste form for aqueous wastes treated at the Hanford Effluent Treatment Facility (ETF). This data package relies primarily upon recent data collected on Cast Stone formulations fabricated with simulants of low-activity waste (LAW) and liquid secondary wastes expected to be produced at Hanford. These data were supplemented, when necessary, with data developed for saltstone (a similar grout waste form used at the Savannah River Site). Work is currently underway to collect data on cementitious waste forms that are similar to Cast Stone and saltstone but are tailored to the characteristics of ETF-treated liquid secondary wastes. Recommended values for key parameters to conduct PA modeling of contaminant release from ETF-treated liquid waste are provided.

  15. A simulation-based robust biofuel facility location model for an integrated bio-energy logistics network

    Directory of Open Access Journals (Sweden)

    Jae-Dong Hong

    2014-10-01

    Full Text Available Purpose: The purpose of this paper is to propose a simulation-based robust biofuel facility location model for solving an integrated bio-energy logistics network (IBLN problem, where biomass yield is often uncertain or difficult to determine.Design/methodology/approach: The IBLN considered in this paper consists of four different facilities: farm or harvest site (HS, collection facility (CF, biorefinery (BR, and blending station (BS. Authors propose a mixed integer quadratic modeling approach to simultaneously determine the optimal CF and BR locations and corresponding biomass and bio-energy transportation plans. The authors randomly generate biomass yield of each HS and find the optimal locations of CFs and BRs for each generated biomass yield, and select the robust locations of CFs and BRs to show the effects of biomass yield uncertainty on the optimality of CF and BR locations. Case studies using data from the State of South Carolina in the United State are conducted to demonstrate the developed model’s capability to better handle the impact of uncertainty of biomass yield.Findings: The results illustrate that the robust location model for BRs and CFs works very well in terms of the total logistics costs. The proposed model would help decision-makers find the most robust locations for biorefineries and collection facilities, which usually require huge investments, and would assist potential investors in identifying the least cost or important facilities to invest in the biomass and bio-energy industry.Originality/value: An optimal biofuel facility location model is formulated for the case of deterministic biomass yield. To improve the robustness of the model for cases with probabilistic biomass yield, the model is evaluated by a simulation approach using case studies. The proposed model and robustness concept would be a very useful tool that helps potential biofuel investors minimize their investment risk.

  16. Proceeding of 31st domestic symposium on failure events and integrity evaluation of nuclear power generation facilities

    International Nuclear Information System (INIS)

    2003-07-01

    As the 31st domestic symposium of Atomic Energy Research Committee, the Japan Welding Engineering Society, the symposium was held titled as 'Damage events and integrity evaluations of nuclear power facilities'. Six speakers gave lectures titled as 'Damages of structural materials in the LWR plants and their measures', 'Inspection and integrity evaluation method of SCC in the BWR plants', 'Measures with chloride SCC of piping', 'High cycle fatigue damage events of small diameter pipes and their measures', 'Management of SCC in in-core instrumentation thimbles' and 'Japanese lost ten years and American and other leaps'. (T. Tanaka)

  17. The challenges of integrating multiple safeguards systems in a large nuclear facility

    International Nuclear Information System (INIS)

    Lavietes, A.; Liguori, C.; Pickrell, M.; Plenteda, R.; Sweet, M.

    2009-01-01

    Full-text: Implementing safeguards in a cost-effective manner in large nuclear facilities such as fuel conditioning, fuel reprocessing, and fuel fabrication plants requires the extensive use of instrumentation that is operated in unattended mode. The collected data is then periodically reviewed by the inspectors either on-site at a central location in the facility or remotely in the IAEA offices. A wide variety of instruments are deployed in large facilities, including video surveillance cameras, electronic sealing devices, non-destructive assay systems based on gamma ray and neutron detection, load cells for mass measurement, ID-readers, and other process-specific monitors. The challenge to integrate these different measurement instruments into an efficient, reliable, and secure system requires implementing standardization at various levels throughout the design process. This standardization includes the data generator behaviour and interface, networking solutions, and data security approaches. This standardization will provide a wide range of savings, including reduced training for inspectors and technicians, reduced periodic technical maintenance, reduced spare parts inventory, increased system robustness, and more predictive system behaviour. The development of standard building blocks will reduce the number of data generators required and allow implementation of simplified architectures that do not require local collection computers but rather utilize transmission of the acquired data directly to a central server via Ethernet connectivity. This approach will result in fewer system components and therefore reduced maintenance efforts and improved reliability. This paper discusses in detail the challenges and the subsequent solutions in the various areas that the IAEA Department of Safeguards has committed to pursue as the best sustainable way of maintaining the ability to implement reliable safeguards systems. (author)

  18. Software quality assurance plan for the National Ignition Facility integrated computer control system

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project`s controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy`s (DOE`s) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project.

  19. Software quality assurance plan for the National Ignition Facility integrated computer control system

    International Nuclear Information System (INIS)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project's controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy's (DOE's) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project

  20. Development of a model forecasting Dermanyssus gallinae's population dynamics for advancing Integrated Pest Management in laying hen facilities.

    Science.gov (United States)

    Mul, Monique F; van Riel, Johan W; Roy, Lise; Zoons, Johan; André, Geert; George, David R; Meerburg, Bastiaan G; Dicke, Marcel; van Mourik, Simon; Groot Koerkamp, Peter W G

    2017-10-15

    The poultry red mite, Dermanyssus gallinae, is the most significant pest of egg laying hens in many parts of the world. Control of D. gallinae could be greatly improved with advanced Integrated Pest Management (IPM) for D. gallinae in laying hen facilities. The development of a model forecasting the pests' population dynamics in laying hen facilities without and post-treatment will contribute to this advanced IPM and could consequently improve implementation of IPM by farmers. The current work describes the development and demonstration of a model which can follow and forecast the population dynamics of D. gallinae in laying hen facilities given the variation of the population growth of D. gallinae within and between flocks. This high variation could partly be explained by house temperature, flock age, treatment, and hen house. The total population growth variation within and between flocks, however, was in part explained by temporal variation. For a substantial part this variation was unexplained. A dynamic adaptive model (DAP) was consequently developed, as models of this type are able to handle such temporal variations. The developed DAP model can forecast the population dynamics of D. gallinae, requiring only current flock population monitoring data, temperature data and information of the dates of any D. gallinae treatment. Importantly, the DAP model forecasted treatment effects, while compensating for location and time specific interactions, handling the variability of these parameters. The characteristics of this DAP model, and its compatibility with different mite monitoring methods, represent progression from existing approaches for forecasting D. gallinae that could contribute to advancing improved Integrated Pest Management (IPM) for D. gallinae in laying hen facilities. Copyright © 2017 Elsevier B.V. All rights reserved.

  1. Facility model for the Los Alamos Plutonium Facility

    International Nuclear Information System (INIS)

    Coulter, C.A.; Thomas, K.E.; Sohn, C.L.; Yarbro, T.F.; Hench, K.W.

    1986-01-01

    The Los Alamos Plutonium Facility contains more than sixty unit processes and handles a large variety of nuclear materials, including many forms of plutonium-bearing scrap. The management of the Plutonium Facility is supporting the development of a computer model of the facility as a means of effectively integrating the large amount of information required for material control, process planning, and facility development. The model is designed to provide a flexible, easily maintainable facility description that allows the faciltiy to be represented at any desired level of detail within a single modeling framework, and to do this using a model program and data files that can be read and understood by a technically qualified person without modeling experience. These characteristics were achieved by structuring the model so that all facility data is contained in data files, formulating the model in a simulation language that provides a flexible set of data structures and permits a near-English-language syntax, and using a description for unit processes that can represent either a true unit process or a major subsection of the facility. Use of the model is illustrated by applying it to two configurations of a fictitious nuclear material processing line

  2. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This document, Volume 5 Book 1, contains cost estimate summaries for a monitored retrievable storage (MRS) facility. The cost estimate is based on the engineering performed during the conceptual design phase of the MRS Facility project

  3. Proposed integrated hazardous waste disposal facility. Public environmental review

    International Nuclear Information System (INIS)

    1998-05-01

    This Public Environmental Report describes a proposal by the Health Department of Western Australia to establish a disposal facility for certain hazardous wastes and seeks comments from governments agencies and the public that will assist the EPA to make its recommendations to. The facility would only be used for wastes generated in Western Australia.The proposal specifically includes: a high temperature incinerator for the disposal of organo-chlorines (including agricultural chemicals and PCBs), and other intractable wastes for which this is the optimum disposal method; an area for the burial (after any appropriate conditioning) of low level radioactive intractable wastes arising from the processing of mineral sands (including monazite, ilmenite and zircon) and phosphate rock. Detailed information is presented on those wastes which are currently identified as requiring disposal at the facility.The proposed facility will also be suitable for the disposal of other intractable wastes including radioactive wastes (from industry, medicine and research) and other solid intractable wastes of a chemical nature including spent catalysts etc. Proposals to dispose of these other wastes at this facility in the future will be referred to the Environmental Protection Authority for separate assessment

  4. Target Assembly Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Target Assembly Facility integrates new armor concepts into actual armored vehicles. Featuring the capability ofmachining and cutting radioactive materials, it...

  5. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  6. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  7. Technical and economic feasibility study for the reactivation of the integral test facility of IPEN/CNEN Nuclear Engineering Center

    Energy Technology Data Exchange (ETDEWEB)

    Biaty, Flávia P.; Rocha, Marcelo da S.; Oliveira, Otávio L. de, E-mail: flavia.biaty@usp.br, E-mail: msrocha@ipen.br, E-mail: otavioluis@ipen.br [Instituto de Pesquisas Energéticas e Nucleares (IPEN/CNEN-SP), São Paulo, SP (Brazil)

    2017-07-01

    The Integral Test Facility of Nuclear Engineering Center (CEN/IPEN/CNEN-SP), known as 'Loop 70', is a semi-industrial thermal-hydraulic test facility and can operate as a BWR (Boiling Water Reactor) or a PWR (Pressurizing Water Reactor) mode. Designed and built in the 1980's, it is currently disabled. The experimental circuits ('test loop') are facilities that reproduce the thermohydraulic and fluid dynamic conditions that occur inside a reactor and are used to simulate the practical reality which it is not possible to be obtained through mathematical models. In this context, this research project aims the development of a Business Plan to analyze the technical and economic feasibility related to the reactivation of the facility. This methodology (adapted to the government sector) is a decision-making tool that will offer a wide perspective of the project, set the guidelines and actions that will define the future of the facility and provide a general rule to make investments on it. This paper presents the historic aspects to better understand the Loop 70's current situation. It also presents information about similar facilities around the world, services that can be offered (thermal-hydraulics parameters measurements, equipment qualification and transient analysis due accident situations), results of the strategic analysis (SWOT) performed, specific goals for each critical success or failure factor of the facility, financial aspects related to the reactivation and an overview of the facility's perspectives. (author)

  8. Technical and economic feasibility study for the reactivation of the integral test facility of IPEN/CNEN Nuclear Engineering Center

    International Nuclear Information System (INIS)

    Biaty, Flávia P.; Rocha, Marcelo da S.; Oliveira, Otávio L. de

    2017-01-01

    The Integral Test Facility of Nuclear Engineering Center (CEN/IPEN/CNEN-SP), known as 'Loop 70', is a semi-industrial thermal-hydraulic test facility and can operate as a BWR (Boiling Water Reactor) or a PWR (Pressurizing Water Reactor) mode. Designed and built in the 1980's, it is currently disabled. The experimental circuits ('test loop') are facilities that reproduce the thermohydraulic and fluid dynamic conditions that occur inside a reactor and are used to simulate the practical reality which it is not possible to be obtained through mathematical models. In this context, this research project aims the development of a Business Plan to analyze the technical and economic feasibility related to the reactivation of the facility. This methodology (adapted to the government sector) is a decision-making tool that will offer a wide perspective of the project, set the guidelines and actions that will define the future of the facility and provide a general rule to make investments on it. This paper presents the historic aspects to better understand the Loop 70's current situation. It also presents information about similar facilities around the world, services that can be offered (thermal-hydraulics parameters measurements, equipment qualification and transient analysis due accident situations), results of the strategic analysis (SWOT) performed, specific goals for each critical success or failure factor of the facility, financial aspects related to the reactivation and an overview of the facility's perspectives. (author)

  9. Wind Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Laurie, Carol

    2017-02-01

    This book takes readers inside the places where daily discoveries shape the next generation of wind power systems. Energy Department laboratory facilities span the United States and offer wind research capabilities to meet industry needs. The facilities described in this book make it possible for industry players to increase reliability, improve efficiency, and reduce the cost of wind energy -- one discovery at a time. Whether you require blade testing or resource characterization, grid integration or high-performance computing, Department of Energy laboratory facilities offer a variety of capabilities to meet your wind research needs.

  10. Knowledge Management tools integration within DLR's concurrent engineering facility

    Science.gov (United States)

    Lopez, R. P.; Soragavi, G.; Deshmukh, M.; Ludtke, D.

    The complexity of space endeavors has increased the need for Knowledge Management (KM) tools. The concept of KM involves not only the electronic storage of knowledge, but also the process of making this knowledge available, reusable and traceable. Establishing a KM concept within the Concurrent Engineering Facility (CEF) has been a research topic of the German Aerospace Centre (DLR). This paper presents the current KM tools of the CEF: the Software Platform for Organizing and Capturing Knowledge (S.P.O.C.K.), the data model Virtual Satellite (VirSat), and the Simulation Model Library (SimMoLib), and how their usage improved the Concurrent Engineering (CE) process. This paper also exposes the lessons learned from the introduction of KM practices into the CEF and elaborates a roadmap for the further development of KM in CE activities at DLR. The results of the application of the Knowledge Management tools have shown the potential of merging the three software platforms with their functionalities, as the next step towards the fully integration of KM practices into the CE process. VirSat will stay as the main software platform used within a CE study, and S.P.O.C.K. and SimMoLib will be integrated into VirSat. These tools will support the data model as a reference and documentation source, and as an access to simulation and calculation models. The use of KM tools in the CEF aims to become a basic practice during the CE process. The settlement of this practice will result in a much more extended knowledge and experience exchange within the Concurrent Engineering environment and, consequently, the outcome of the studies will comprise higher quality in the design of space systems.

  11. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This document, Volume 6 Book 1, contains information on design studies of a Monitored Retrievable Storage (MRS) facility. Topics include materials handling; processing; support systems; support utilities; spent fuel; high-level waste and alpha-bearing waste storage facilities; and field drywell storage

  12. Technical feasibility of an Integral Fast Reactor (IFR) as a future option for fast reactor cycles. Integrate a small metal-fueled fast reactor and pyroprocessing facilities

    International Nuclear Information System (INIS)

    Tanaka, Nobuo

    2017-01-01

    Integral Fast Reactor that integrated fast reactor and pyrorocessing facilities developed by Argonne National Laboratory in the U.S. is an excellent nuclear fuel cycle system for passive safety, nuclear non-proliferation, and reduction in radioactive waste. In addition, this system can be considered as a technology applicable to the treatment of the fuel debris caused by the Fukushima Daiichi Nuclear Power Station accident. This study assessed the time required for debris processing, safety of the facilities, and construction cost when using this technology, and examined technological possibility including future technological issues. In a small metal-fueled reactor, it is important to design the core that achieves both of reduction in combustion reactivity and reduction in coolant reactivity. In system design, calorimetric analysis, structure soundness assessment, seismic feasibility establishment study, etc. are important. Regarding safety, research and testing are necessary on the capabilities of passive reactor shutdown and reactor core cooling as well as measures for avoiding re-criticality, even when emergency stop has failed. In dry reprocessing system, studies on electrolytic reduction and electrolytic refining process for treating the debris with compositions different from those of normal fuel are necessary. (A.O.)

  13. Facility effluent monitoring plan for 242-A evaporator facility

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years

  14. Proceeding of 26th domestic symposium on present and future of integrity monitoring technology in nuclear power generation facilities

    International Nuclear Information System (INIS)

    2000-06-01

    As the 26th domestic symposium of Atomic Energy Research Committee, the Japan Welding Engineering Society, the symposium was held titled as 'Current status and future of integrity monitoring techniques in nuclear power facilities'. Six speakers gave lectures titled as 'Maintenance and integrity monitoring in nuclear power plants', 'Present status of fatigue and creep-fatigue monitoring techniques in the US', 'Fatigue monitoring system in Tsuruga-1 nuclear power station', 'Vibration monitoring technique of rotational machine', 'SCC monitoring with electrochemical noise analysis' and Monitoring technique for corrosive environments and crack shape'. (T. Tanaka)

  15. Renewable Electricity-to-Grid Integration | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Renewable Electricity-to-Grid Integration Renewable Electricity-to-Grid Integration NREL works with industry partners to optimize strategies for effectively interconnecting renewable renewable electric grid integration work includes research and development (R&D) on advanced inverters

  16. Integrated Facilities Management and Fixed Asset Accounting.

    Science.gov (United States)

    Golz, W. C., Jr.

    1984-01-01

    A record of a school district's assets--land, buildings, machinery, and equipment--can be a useful management tool that meets accounting requirements and provides appropriate information for budgeting, forecasting, and facilities management. (MLF)

  17. CSNI Integral test facility validation matrix for the assessment of thermal-hydraulic codes for LWR LOCA and transients

    International Nuclear Information System (INIS)

    1996-07-01

    This report deals with an internationally agreed integral test facility (ITF) matrix for the validation of best estimate thermal-hydraulic computer codes. Firstly, the main physical phenomena that occur during the considered accidents are identified, test types are specified, and test facilities suitable for reproducing these aspects are selected. Secondly, a life of selected experiments carried out in these facilities has been set down. The criteria to achieve the objectives are outlined. The construction of such a matrix is an attempt to collect together in a systematic way the best sets of openly available test data for code validation, assessment and improvement, including quantitative assessment of uncertainties in the modelling of phenomena by the codes. In addition to this objective, it is an attempt to record information which has been generated around the world over the last 20 years so that it is more accessible to present and future workers in that field than would otherwise be the case

  18. Advanced Microanalysis Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Advanced Microanalysis Facility fully integrates capabilities for chemical and structural analysis of electronic materials and devices for the U.S. Army and DoD....

  19. Multilevel examination of facility characteristics, social integration, and health for older adults living in nursing homes.

    Science.gov (United States)

    Leedahl, Skye N; Chapin, Rosemary K; Little, Todd D

    2015-01-01

    Testing a model based on past research and theory, this study assessed relationships between facility characteristics (i.e., culture change efforts, social workers) and residents' social networks and social support across nursing homes; and examined relationships between multiple aspects of social integration (i.e., social networks, social capital, social engagement, social support) and mental and functional health for older adults in nursing homes. Data were collected at nursing homes using a planned missing data design with random sampling techniques. Data collection occurred at the individual-level through in-person structured interviews with older adult nursing home residents (N = 140) and at the facility-level (N = 30) with nursing home staff. The best fitting multilevel structural equation model indicated that the culture change subscale for relationships significantly predicted differences in residents' social networks. Additionally, social networks had a positive indirect relationship with mental and functional health among residents primarily via social engagement. Social capital had a positive direct relationship with both health outcomes. To predict better social integration and mental and functional health outcomes for nursing homes residents, study findings support prioritizing that close relationships exist among staff, residents, and the community as well as increased resident social engagement and social trust. © The Author 2014. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  20. Economics of reusable facilities

    International Nuclear Information System (INIS)

    Antia, D.D.J.

    1992-01-01

    In this paper some of the different economic development strategies that can be used for reusable facilities in the UK, Norway, Netherlands and in some production sharing contracts are outlined. These strategies focus on an integrated decision analysis approach which considers development phasing, reservoir management, tax planning and where appropriate facility purchase, leasing, or sale and leaseback decisions

  1. Development of Integral Effect Test Facility P and ID and Technical Specification for SMART Fluid System

    International Nuclear Information System (INIS)

    Lee, Sang Il; Jung, Y. H.; Yang, H. J.; Song, S. Y.; Han, O. J.; Lee, B. J.; Kim, Y. A.; Lim, J. H.; Park, K. W.; Kim, N. G.

    2010-01-01

    SMART integral test loop is the thermal hydraulic test facility with a high pressure and temperature for simulating the major systems of the prototype reactor, SMART-330. The objective of this project is to conduct the basic design for constructing SMART ITL. The major results of this project include a series of design documents, technical specifications and P and ID. The results can be used as the fundamental materials for making the detailed design which is essential for manufacturing and installing SMART ITL

  2. Sugarcane agricultural-industrial facilities and greenhouses integration

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Andres da [Estufas Agricolas Comercio e Assessoria Ltda. (EACEA), SP (Brazil)

    2012-07-01

    This chapter approaches Brazilian greenhouse market and technology, food market trends, integration of bioethanol distilleries with GH production, recovering CO{sub 2} from fermentation process, recovering low temperature energy, using vinasse and bagasse in GH processes, examples of integrated GH in the world, a tomato integrated GH study case, and a business model.

  3. Recharge Data Package for the 2005 Integrated Disposal Facility Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Fayer, Michael J.; Szecsody, Jim E.

    2004-06-30

    Pacific Northwest National Laboratory assisted CH2M Hill Hanford Group, Inc., (CHG) by providing estimates of recharge rates for current conditions and long-term scenarios involving disposal in the Integrated Disposal Facility (IDF). The IDF will be located in the 200 East Area at the Hanford Site and will receive several types of waste including immobilized low-activity waste. The recharge estimates for each scenario were derived from lysimeter and tracer data collected by the IDF PA Project and from modeling studies conducted for the project. Recharge estimates were provided for three specific site features (the surface barrier; possible barrier side slopes; and the surrounding soil) and four specific time periods (pre-Hanford; Hanford operations; surface barrier design life; post-barrier design life). CHG plans to conduct a performance assessment of the latest IDF design and call it the IDF 2005 PA; this recharge data package supports the upcoming IDF 2005 PA.

  4. Integration of small computers in the low budget facility

    International Nuclear Information System (INIS)

    Miller, G.E.; Crofoot, T.A.

    1988-01-01

    Inexpensive computers (PC's) are well within the reach of low budget reactor facilities. It is possible to envisage many uses that will both improve capabilities of existing instrumentation and also assist operators and staff with certain routine tasks. Both of these opportunities are important for survival at facilities with severe budget and staffing limitations. (author)

  5. The Multi-User Droplet Combustion Apparatus: the Development and Integration Concept for Droplet Combustion Payloads in the Fluids and Combustion Facility Combustion Integrated Rack

    Science.gov (United States)

    Myhre, C. A.

    2002-01-01

    The Multi-user Droplet Combustion Apparatus (MDCA) is a multi-user facility designed to accommodate four different droplet combustion science experiments. The MDCA will conduct experiments using the Combustion Integrated Rack (CIR) of the NASA Glenn Research Center's Fluids and Combustion Facility (FCF). The payload is planned for the International Space Station. The MDCA, in conjunction with the CIR, will allow for cost effective extended access to the microgravity environment, not possible on previous space flights. It is currently in the Engineering Model build phase with a planned flight launch with CIR in 2004. This paper provides an overview of the capabilities and development status of the MDCA. The MDCA contains the hardware and software required to conduct unique droplet combustion experiments in space. It consists of a Chamber Insert Assembly, an Avionics Package, and a multiple array of diagnostics. Its modular approach permits on-orbit changes for accommodating different fuels, fuel flow rates, soot sampling mechanisms, and varying droplet support and translation mechanisms to accommodate multiple investigations. Unique diagnostic measurement capabilities for each investigation are also provided. Additional hardware provided by the CIR facility includes the structural support, a combustion chamber, utilities for the avionics and diagnostic packages, and the fuel mixing capability for PI specific combustion chamber environments. Common diagnostics provided by the CIR will also be utilized by the MDCA. Single combustible fuel droplets of varying sizes, freely deployed or supported by a tether are planned for study using the MDCA. Such research supports how liquid-fuel-droplets ignite, spread, and extinguish under quiescent microgravity conditions. This understanding will help us develop more efficient energy production and propulsion systems on Earth and in space, deal better with combustion generated pollution, and address fire hazards associated with

  6. Stored energy analysis in scale-down test facility

    International Nuclear Information System (INIS)

    Deng Chengcheng; Qin Benke; Fang Fangfang; Chang Huajian; Ye Zishen

    2013-01-01

    In the integral test facilities that simulate the accident transient process of the prototype nuclear power plant, the stored energy in the metal components has a direct influence on the simulation range and the test results of the facilities. Based on the heat transfer theory, three methods analyzing the stored energy were developed, and a thorough study on the stored energy problem in the scale-down test facilities was further carried out. The lumped parameter method and power integration method were applied to analyze the transient process of energy releasing and to evaluate the average total energy stored in the reactor pressure vessel of the ACME (advanced core-cooling mechanism experiment) facility, which is now being built in China. The results show that the similarity requirements for such three methods to analyze the stored energy in the test facilities are reduced gradually. Under the condition of satisfying the integral similarity of natural circulation, the stored energy releasing process in the scale-down test facilities can't maintain exact similarity. The stored energy in the reactor pressure vessel wall of ACME, which is released quickly during the early stage of rapid depressurization of system, will not make a major impact on the long-term behavior of system. And the scaling distortion of integral average total energy of the stored heat is acceptable. (authors)

  7. Roll-to-Roll Inkjet Printing and Photonic Sintering of Electrodes for ITO Free Polymer Solar Cell Modules and Facile Product Integration

    DEFF Research Database (Denmark)

    Angmo, Dechan; Larsen-Olsen, Thue Trofod; Jørgensen, Mikkel

    2013-01-01

    Small polymer solar cell modules that are manufactured without indium-tin-oxide using only roll-to-roll printing and coating techniques under ambient conditions enable facile integration into a simple demonstrator (for example a laser pointer). Semitransparent front electrode grid structures prep...

  8. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov (United States)

    , utilities can operate more efficiently and profitably. That can increase the use of renewable energy sources challenge to utility companies, grid operators, and other stakeholders involved in wind energy integration recording is available from the July 16 webinar "Smart Grid Research at NREL's Energy Systems

  9. CIF---Design basis for an integrated incineration facility

    International Nuclear Information System (INIS)

    Bennett, G.F.

    1991-01-01

    This paper discusses the evolution of chosen technologies that occurred during the design process of the US Department of Energy (DOE) incineration system designated the Consolidated Incineration Facility (CIF) as the Savannah River Plant, Aiken, South Carolina. The Plant is operated for DOE by the Westinghouse Savannah River Company. The purpose of the incineration system is to treat low level radioactive and/or hazardous liquid and solid wastes by combustion. The objective for the facility is to thermally destroy toxic constituents and volume reduce waste material. Design criteria requires operation be controlled within the limits of RCRA's permit envelope

  10. Facility Effluent Monitoring Plan for the uranium trioxide facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  11. 8. High power laser and ignition facilities

    International Nuclear Information System (INIS)

    Bayramian, A.J.; Beach, R.J.; Bibeau, C.

    2002-01-01

    This document gives a review of the various high power laser projects and ignition facilities in the world: the Mercury laser system and Electra (Usa), the krypton fluoride (KrF) laser and the HALNA (high average power laser for nuclear-fusion application) project (Japan), the Shenguang series, the Xingguang facility and the TIL (technical integration line) facility (China), the Vulcan peta-watt interaction facility (UK), the Megajoule project and its feasibility phase: the LIL (laser integration line) facility (France), the Asterix IV/PALS high power laser facility (Czech Republic), and the Phelix project (Germany). In Japan the 100 TW Petawatt Module Laser, constructed in 1997, is being upgraded to the world biggest peta-watt laser. Experiments have been performed with single-pulse large aperture e-beam-pumped Garpun (Russia) and with high-current-density El-1 KrF laser installation (Russia) to investigate Al-Be foil transmittance and stability to multiple e-beam irradiations. An article is dedicated to a comparison of debris shield impacts for 2 experiments at NIF (national ignition facility). (A.C.)

  12. Environmental restoration plan for the transfer of surplus facilities to the Facility Transition Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This report will provide guidance on management, coordination, and integration of plans to transition facilities to the Facility Transition Program and activities as related to the Oak Ridge National Laboratory (ORNL) Environmental Restoration Program facilities. This report gives (1) guidance on the steps necessary for identifying ORNL surplus facilities, (2) interfaces of Surveillance and Maintenance (S and M) and Isotope Facility Deactivation program managers, (3) roles and responsibilities of the facility managers, and (4) initial S and M requirements upon acceptance into the Facility Transition Program

  13. Facility management and energy efficiency -- analysis and recommendations; Facility Management und Energieeffizienz: Analyse und Handlungsempfehlungen

    Energy Technology Data Exchange (ETDEWEB)

    Staub, P.; Weibel, K.; Zaugg, T. [Pom and Consulting Ltd., Zuerich (Switzerland); Lang, R. [Gruenberg and Partner Ltd., Zuerich (Switzerland); Frei, Ch. [Herzog Kull Group, Aarau (Switzerland)

    2001-07-01

    This final report presents the results of a study made on how facility management (FM) is positioned in enterprises and on how energy management can be integrated into the facility management process. Also, recommendations are made on the actions that are considered necessary to improve the understanding of facility management and energy management. The findings of an analysis made of the results of a survey among 200 enterprises, 20 interviews and 5 case studies are presented. The authors state that, in spite of the relatively small sample taken - mostly larger enterprises - trends in facility management and energy management could be shown. The findings of the survey, such as the relative importance of the integration of energy topics in facility management and the need for standardised indicators and benchmarking, are discussed in detail. Also, it is noted that the success of FM is in part due to delegation of responsibility to smaller business units or even to individual employees. The market potential for FM services is examined, with yearly growth rates of up to 20%. The importance of anchoring FM strategies at the top level of management is stressed, as is the need for promotion of the idea of facility management and training concepts for those responsible for its implementation.

  14. Exercise evaluation and simulation facility

    International Nuclear Information System (INIS)

    Meitzler, W.D.; Jaske, R.T.

    1983-12-01

    The Exercise Evaluation and Simulation Facility (EESF) is a mini computer based system that will serve as a tool to aid FEMA in the evaluation of radiological emergency plans and preparedness around commercial nucler power facilities. The EESF integrates the following resources: a meteorological model, dose model, evacuation model, map information, and exercise information into a single system. Thus the user may access these various resources concurrently, and on completion display the results on a color graphic display or hardcopy unit. A unique capability made possible by the integration of these models is the computation of estimated total dose to the population

  15. Facility management research in the Netherlands

    NARCIS (Netherlands)

    Thijssen, Thomas; van der Voordt, Theo; Mobach, Mark P.

    This article provides a brief overview of the history and development of facility management research in the Netherlands and indicates future directions. Facility management as a profession has developed from single service to multi-services and integral services over the past 15 years.

  16. Integrated assessment of thermal hydraulic processes in W7-X fusion experimental facility

    Energy Technology Data Exchange (ETDEWEB)

    Kaliatka, T., E-mail: tadas.kaliatka@lei.lt; Uspuras, E.; Kaliatka, A.

    2017-02-15

    Highlights: • The model of Ingress of Coolant Event experiment facility was developed using the RELAP5 code. • Calculation results were compared with Ingress of Coolant Event experiment data. • Using gained experience, the numerical model of Wendelstein 7-X facility was developed. • Performed analysis approved pressure increase protection system for LOCA event. - Abstract: Energy received from the nuclear fusion reaction is one of the most promising options for generating large amounts of carbon-free energy in the future. However, physical and technical problems existing in this technology are complicated. Several experimental nuclear fusion devices around the world have already been constructed, and several are under construction. However, the processes in the cooling system of the in-vessel components, vacuum vessel and pressure increase protection system of nuclear fusion devices are not widely studied. The largest amount of radioactive materials is concentrated in the vacuum vessel of the fusion device. Vacuum vessel is designed for the vacuum conditions inside the vessel. Rupture of the in-vessel components of the cooling system pipe may lead to a sharp pressure increase and possible damage of the vacuum vessel. To prevent the overpressure, the pressure increase protection system should be designed and implemented. Therefore, systematic and detailed experimental and numerical studies, regarding the thermal-hydraulic processes in cooling system, vacuum vessel and pressure increase protection system, are important and relevant. In this article, the numerical investigation of thermal-hydraulic processes in cooling systems of in-vessel components, vacuum vessels and pressure increase protection system of fusion devices is presented. Using the experience gained from the modelling of “Ingress of Coolant Event” experimental facilities, the numerical model of Wendelstein 7-X (W7-X) experimental fusion device was developed. The integrated analysis of the

  17. Geochemical Data Package for the 2005 Hanford Integrated Disposal Facility Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Krupka, Kenneth M.; Serne, R JEFFREY.; Kaplan, D I.

    2004-09-30

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is designing and assessing the performance of an integrated disposal facility (IDF) to receive low-level waste (LLW), mixed low-level waste (MLLW), immobilized low-activity waste (ILAW), and failed or decommissioned melters. The CH2M HILL project to assess the performance of this disposal facility is the Hanford IDF Performance Assessment (PA) activity. The goal of the Hanford IDF PA activity is to provide a reasonable expectation that the disposal of the waste is protective of the general public, groundwater resources, air resources, surface-water resources, and inadvertent intruders. Achieving this goal will require prediction of contaminant migration from the facilities. This migration is expected to occur primarily via the movement of water through the facilities, and the consequent transport of dissolved contaminants in the vadose zone to groundwater where contaminants may be re-introduced to receptors via drinking water wells or mixing in the Columbia River. Pacific Northwest National Laboratory (PNNL) assists CH2M HILL in their performance assessment activities. One of the PNNL tasks is to provide estimates of the geochemical properties of the materials comprising the IDF, the disturbed region around the facility, and the physically undisturbed sediments below the facility (including the vadose zone sediments and the aquifer sediments in the upper unconfined aquifer). The geochemical properties are expressed as parameters that quantify the adsorption of contaminants and the solubility constraints that might apply for those contaminants that may exceed solubility constraints. The common parameters used to quantify adsorption and solubility are the distribution coefficient (Kd) and the thermodynamic solubility product (Ksp), respectively. In this data package, we approximate the solubility of contaminants using a more simplified construct, called the solution concentration limit, a constant value. The Kd values and

  18. Facility effluent monitoring plan for the tank farms facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bachand, D.D.; Crummel, G.M.

    1995-05-01

    A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

  19. The SwissFEL Experimental Laser facility.

    Science.gov (United States)

    Erny, Christian; Hauri, Christoph Peter

    2016-09-01

    The hard X-ray laser SwissFEL at the Paul Scherrer Institute is currently being commissioned and will soon become available for users. In the current article the laser facility is presented, an integral part of the user facility, as most time-resolved experiments will require a versatile optical laser infrastructure and precise information about the relative delay between the X-ray and optical pulse. The important key parameters are a high availability and long-term stability while providing advanced laser performance in the wavelength range from ultraviolet to terahertz. The concept of integrating a Ti:sapphire laser amplifier system with subsequent frequency conversion stages and drift compensation into the SwissFEL facility environment for successful 24 h/7 d user operation is described.

  20. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  1. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  2. Facility effluent monitoring plan for the plutonium uranium extraction facility

    International Nuclear Information System (INIS)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  3. Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility

    International Nuclear Information System (INIS)

    Greager, E.M.

    1997-01-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years

  4. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  5. Facility design consequences of different employees’ quality perceptions

    NARCIS (Netherlands)

    Kok, Herman; Mobach, Mark P.; Omta, Onno

    2015-01-01

    An important challenge for facility management is to integrate the complex and comprehensive construct of different service processes and physical elements of the service facility into a meaningful and functional facility design. The difficulty of this task is clearly indicated by the present study

  6. Transition from depressurization to long term cooling in AP600 scaled integral test facilities

    International Nuclear Information System (INIS)

    Bessette, D.E.; Marzo, M. di

    1999-01-01

    A novel light water reactor design called the AP600 has been proposed by the Westinghouse Electric Corporation. In the evaluation of this plant's behavior during a small break loss of coolant accident (LOCA), the crucial transition to low pressure, long-term cooling is marked by the injection of the gravitationally driven flow from the in-containment refueling water storage tank (IRWST). The onset of this injection is characterized by intermittency in the IRWST flow. This happens at a time when the reactor vessel reaches its minimum inventory. Therefore, it is important to understand and scale the behavior of the integral experimental test facilities during this portion of the transient. The explanation is that the periodic liquid drains and refills of the pressurizer are the reason for the intermittent behavior. The momentum balance for the surge line yields the nondimensional parameter controlling this process. Data from one of the three experimental facilities represent the phenomena well at the prototypical scale. The impact of the intermittent IRWST injection on the safe plant operation is assessed and its implications are successfully resolved. The oscillation is found to result from, in effect, excess water in the primary system and it is not of safety significance. (orig.)

  7. Integrated Corrosion Facility for long-term testing of candidate materials for high-level radioactive waste containment

    International Nuclear Information System (INIS)

    Estill, J.C.; Dalder, E.N.C.; Gdowski, G.E.; McCright, R.D.

    1994-10-01

    A long-term-testing facility, the Integrated Corrosion Facility (I.C.F.), is being developed to investigate the corrosion behavior of candidate construction materials for high-level-radioactive waste packages for the potential repository at Yucca Mountain, Nevada. Corrosion phenomena will be characterized in environments considered possible under various scenarios of water contact with the waste packages. The testing of the materials will be conducted both in the liquid and high humidity vapor phases at 60 and 90 degrees C. Three classes of materials with different degrees of corrosion resistance will be investigated in order to encompass the various design configurations of waste packages. The facility is expected to be in operation for a minimum of five years, and operation could be extended to longer times if warranted. A sufficient number of specimens will be emplaced in the test environments so that some can be removed and characterized periodically. The corrosion phenomena to be characterized are general, localized, galvanic, and stress corrosion cracking. The long-term data obtained from this study will be used in corrosion mechanism modeling, performance assessment, and waste package design. Three classes of materials are under consideration. The corrosion resistant materials are high-nickel alloys and titanium alloys; the corrosion allowance materials are low-alloy and carbon steels; and the intermediate corrosion resistant materials are copper-nickel alloys

  8. Simulation Facilities and Test Beds for Galileo

    Science.gov (United States)

    Schlarmann, Bernhard Kl.; Leonard, Arian

    2002-01-01

    Galileo is the European satellite navigation system, financed by the European Space Agency (ESA) and the European Commission (EC). The Galileo System, currently under definition phase, will offer seamless global coverage, providing state-of-the-art positioning and timing services. Galileo services will include a standard service targeted at mass market users, an augmented integrity service, providing integrity warnings when fault occur and Public Regulated Services (ensuring a continuity of service for the public users). Other services are under consideration (SAR and integrated communications). Galileo will be interoperable with GPS, and will be complemented by local elements that will enhance the services for specific local users. In the frame of the Galileo definition phase, several system design and simulation facilities and test beds have been defined and developed for the coming phases of the project, respectively they are currently under development. These are mainly the following tools: Galileo Mission Analysis Simulator to design the Space Segment, especially to support constellation design, deployment and replacement. Galileo Service Volume Simulator to analyse the global performance requirements based on a coverage analysis for different service levels and degrades modes. Galileo System Simulation Facility is a sophisticated end-to-end simulation tool to assess the navigation performances for a complete variety of users under different operating conditions and different modes. Galileo Signal Validation Facility to evaluate signal and message structures for Galileo. Galileo System Test Bed (Version 1) to assess and refine the Orbit Determination &Time Synchronisation and Integrity algorithms, through experiments relying on GPS space infrastructure. This paper presents an overview on the so called "G-Facilities" and describes the use of the different system design tools during the project life cycle in order to design the system with respect to

  9. Comparison of three small-break loss-of-coolant accident tests with different break locations using the system-integrated modular advanced reactor-integral test loop facility to estimate the safety of the smart design

    OpenAIRE

    Hwang Bae; Dong Eok Kim; Sung-Uk Ryu; Sung-Jae Yi; Hyun-Sik Park

    2017-01-01

    Three small-break loss-of-coolant accident (SBLOCA) tests with safety injection pumps were carried out using the integral-effect test loop for SMART (System-integrated Modular Advanced ReacTor), i.e., the SMART-ITL facility. The types of break are a safety injection system line break, shutdown cooling system line break, and pressurizer safety valve line break. The thermal–hydraulic phenomena show a traditional behavior to decrease the temperature and pressure whereas the local phenomena are s...

  10. The CUTLASS database facilities

    International Nuclear Information System (INIS)

    Jervis, P.; Rutter, P.

    1988-09-01

    The enhancement of the CUTLASS database management system to provide improved facilities for data handling is seen as a prerequisite to its effective use for future power station data processing and control applications. This particularly applies to the larger projects such as AGR data processing system refurbishments, and the data processing systems required for the new Coal Fired Reference Design stations. In anticipation of the need for improved data handling facilities in CUTLASS, the CEGB established a User Sub-Group in the early 1980's to define the database facilities required by users. Following the endorsement of the resulting specification and a detailed design study, the database facilities have been implemented as an integral part of the CUTLASS system. This paper provides an introduction to the range of CUTLASS Database facilities, and emphasises the role of Database as the central facility around which future Kit 1 and (particularly) Kit 6 CUTLASS based data processing and control systems will be designed and implemented. (author)

  11. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Thompson, R.J.; Sontage, S.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  12. Integrated O&M for energy generation and exchange facilities; O&M integral para instalaciones de generación e intercambio de energía

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    Ingeteam Service, part of the Ingeteam Group, is a leading company in the provision of integrated O&M services at energy generation and exchange facilities worldwide. From its head office in the Albacete Science and Technology Park, it manages the work of the 1,300 employees that make up its global workforce, rendering services to wind farms, PV installations and power generation plants. In addition, it maintains an active participation strategy in a range of R&D+i programmes that improve the existing technologies and are geared towards new production systems and new diagnostic techniques, applied to renewables installation maintenance. (Author)

  13. Health risks for the population living in the vicinity of an Integrated Waste Management Facility: Screening environmental pollutants

    International Nuclear Information System (INIS)

    Domingo, José L.; Rovira, Joaquim; Vilavert, Lolita; Nadal, Martí; Figueras, María J.; Schuhmacher, Marta

    2015-01-01

    We performed a screening investigation to assess the human health risks of the Integrated Waste Management Facility (IWMF: mechanical–biological treatment (MBT) plant plus municipal solid waste incinerator (MSWI); Ecoparc-3) of Barcelona (Spain). Air concentrations of pollutants potentially released by the MBT plant (VOCs and bioaerosols) and the MSWI (trace elements, PCDD/Fs and PCBs) were determined. Trace elements, PCDD/Fs and PCBs were also analyzed in soil samples. The concentrations of trace elements and bioaerosols were similar to those previously reported in other areas of similar characteristics, while formaldehyde was the predominant VOC. Interestingly, PCDD/F concentrations in soil and air were the highest ever reported near a MSWI in Catalonia, being maximum concentrations 10.8 ng WHO-TEQ/kg and 41.3 fg WHO-TEQ/m 3 , respectively. In addition, there has not been any reduction in soils, even after the closure of a power plant located adjacently. Human health risks of PCDD/F exposure in the closest urban nucleus located downwind the MSWI are up to 10-times higher than those nearby other MSWIs in Catalonia. Although results must be considered as very preliminary, they are a serious warning for local authorities. We strongly recommend to conduct additional studies to confirm these findings and, if necessary, to implement measures to urgently mitigate the impact of the MSWI on the surrounding environment. We must also state the tremendous importance of an individual evaluation of MSWIs, rather than generalizing their environmental and health risks. - Highlights: • Health risks of an Integrated Waste Management Facility in Catalonia are assessed. • PCDD/F exposure near this facility is up to 10-times higher than that near others. • Environmental monitoring of incineration plants should be performed case-by-case. • Since results are very preliminary, confirmatory studies should be conducted

  14. Health risks for the population living in the vicinity of an Integrated Waste Management Facility: Screening environmental pollutants

    Energy Technology Data Exchange (ETDEWEB)

    Domingo, José L., E-mail: joseluis.domingo@urv.cat [Laboratory of Toxicology and Environmental Health, School of Medicine, IISPV, Universitat Rovira i Virgili, Sant Llorenç 21, 43201 Reus, Catalonia (Spain); Rovira, Joaquim [Laboratory of Toxicology and Environmental Health, School of Medicine, IISPV, Universitat Rovira i Virgili, Sant Llorenç 21, 43201 Reus, Catalonia (Spain); Departament d' Enginyeria Quimica, Universitat Rovira i Virgili, Av. Països Catalans 26, 43007 Tarragona, Catalonia (Spain); Vilavert, Lolita; Nadal, Martí [Laboratory of Toxicology and Environmental Health, School of Medicine, IISPV, Universitat Rovira i Virgili, Sant Llorenç 21, 43201 Reus, Catalonia (Spain); Figueras, María J. [Microbiology Unit, School of Medicine, Universitat Rovira i Virgili, Sant Llorenç 21, 43201 Reus, Catalonia (Spain); Schuhmacher, Marta [Laboratory of Toxicology and Environmental Health, School of Medicine, IISPV, Universitat Rovira i Virgili, Sant Llorenç 21, 43201 Reus, Catalonia (Spain); Departament d' Enginyeria Quimica, Universitat Rovira i Virgili, Av. Països Catalans 26, 43007 Tarragona, Catalonia (Spain)

    2015-06-15

    We performed a screening investigation to assess the human health risks of the Integrated Waste Management Facility (IWMF: mechanical–biological treatment (MBT) plant plus municipal solid waste incinerator (MSWI); Ecoparc-3) of Barcelona (Spain). Air concentrations of pollutants potentially released by the MBT plant (VOCs and bioaerosols) and the MSWI (trace elements, PCDD/Fs and PCBs) were determined. Trace elements, PCDD/Fs and PCBs were also analyzed in soil samples. The concentrations of trace elements and bioaerosols were similar to those previously reported in other areas of similar characteristics, while formaldehyde was the predominant VOC. Interestingly, PCDD/F concentrations in soil and air were the highest ever reported near a MSWI in Catalonia, being maximum concentrations 10.8 ng WHO-TEQ/kg and 41.3 fg WHO-TEQ/m{sup 3}, respectively. In addition, there has not been any reduction in soils, even after the closure of a power plant located adjacently. Human health risks of PCDD/F exposure in the closest urban nucleus located downwind the MSWI are up to 10-times higher than those nearby other MSWIs in Catalonia. Although results must be considered as very preliminary, they are a serious warning for local authorities. We strongly recommend to conduct additional studies to confirm these findings and, if necessary, to implement measures to urgently mitigate the impact of the MSWI on the surrounding environment. We must also state the tremendous importance of an individual evaluation of MSWIs, rather than generalizing their environmental and health risks. - Highlights: • Health risks of an Integrated Waste Management Facility in Catalonia are assessed. • PCDD/F exposure near this facility is up to 10-times higher than that near others. • Environmental monitoring of incineration plants should be performed case-by-case. • Since results are very preliminary, confirmatory studies should be conducted.

  15. Conceptual design of an ALICE Tier-2 centre. Integrated into a multi-purpose computing facility

    Energy Technology Data Exchange (ETDEWEB)

    Zynovyev, Mykhaylo

    2012-06-29

    This thesis discusses the issues and challenges associated with the design and operation of a data analysis facility for a high-energy physics experiment at a multi-purpose computing centre. At the spotlight is a Tier-2 centre of the distributed computing model of the ALICE experiment at the Large Hadron Collider at CERN in Geneva, Switzerland. The design steps, examined in the thesis, include analysis and optimization of the I/O access patterns of the user workload, integration of the storage resources, and development of the techniques for effective system administration and operation of the facility in a shared computing environment. A number of I/O access performance issues on multiple levels of the I/O subsystem, introduced by utilization of hard disks for data storage, have been addressed by the means of exhaustive benchmarking and thorough analysis of the I/O of the user applications in the ALICE software framework. Defining the set of requirements to the storage system, describing the potential performance bottlenecks and single points of failure and examining possible ways to avoid them allows one to develop guidelines for selecting the way how to integrate the storage resources. The solution, how to preserve a specific software stack for the experiment in a shared environment, is presented along with its effects on the user workload performance. The proposal for a flexible model to deploy and operate the ALICE Tier-2 infrastructure and applications in a virtual environment through adoption of the cloud computing technology and the 'Infrastructure as Code' concept completes the thesis. Scientific software applications can be efficiently computed in a virtual environment, and there is an urgent need to adapt the infrastructure for effective usage of cloud resources.

  16. Conceptual design of an ALICE Tier-2 centre. Integrated into a multi-purpose computing facility

    International Nuclear Information System (INIS)

    Zynovyev, Mykhaylo

    2012-01-01

    This thesis discusses the issues and challenges associated with the design and operation of a data analysis facility for a high-energy physics experiment at a multi-purpose computing centre. At the spotlight is a Tier-2 centre of the distributed computing model of the ALICE experiment at the Large Hadron Collider at CERN in Geneva, Switzerland. The design steps, examined in the thesis, include analysis and optimization of the I/O access patterns of the user workload, integration of the storage resources, and development of the techniques for effective system administration and operation of the facility in a shared computing environment. A number of I/O access performance issues on multiple levels of the I/O subsystem, introduced by utilization of hard disks for data storage, have been addressed by the means of exhaustive benchmarking and thorough analysis of the I/O of the user applications in the ALICE software framework. Defining the set of requirements to the storage system, describing the potential performance bottlenecks and single points of failure and examining possible ways to avoid them allows one to develop guidelines for selecting the way how to integrate the storage resources. The solution, how to preserve a specific software stack for the experiment in a shared environment, is presented along with its effects on the user workload performance. The proposal for a flexible model to deploy and operate the ALICE Tier-2 infrastructure and applications in a virtual environment through adoption of the cloud computing technology and the 'Infrastructure as Code' concept completes the thesis. Scientific software applications can be efficiently computed in a virtual environment, and there is an urgent need to adapt the infrastructure for effective usage of cloud resources.

  17. ISO 9001 and ISO 14001: An Integrated Quality Management System for an MTR Facility SAFARI-1 Research Reactor

    International Nuclear Information System (INIS)

    Du Bruyn, J.F.; Piani, C.S.B.

    2005-01-01

    The SAFARI-1 research reactor, owned and operated by the South African Nuclear Energy Corporation (Necsa), initially obtained ISO 9001 accreditation of its Quality, Health, Safety and Environmental (QHSE) management system via international affiliation from the South African Bureau of Standards (SABS) during 1998 and re-certification according to ISO 9001 (2000) in 2003. With ever-increasing demands on nuclear facilities to demonstrate conformance to environmental policies, SAFARI-1 has now developed an Environmental Management System (EMS) that is compliant with ISO 14001 (1996) and is fully integrated with the SAFARI-1 Quality Management System (QMS). The dynamic involvement of SAFARI-1 in commercial applications demanded that any transition of the original QMS to a fully incorporated QHSE system had to be done in a way that would ensure sustained delivery of a safe and reliable service with continuous quality. At the same time, the primary vision of operating a facility under an efficient financial management programme was essential. The criteria established by the original ISO 9001 compliant QMS were appraised against the additional requirements of ISO 14001 and a suitable superstructure derived for generation and implementation of an inclusive EMS. The transitional integration of this system was planned so as to produce a QMS suitable to quality, environmental and other management related issues for application to the unique function of a nuclear research reactor. (author)

  18. Results of 15 years experiments in the PMK-2 integral-type facility for VVERs

    Energy Technology Data Exchange (ETDEWEB)

    Szabados, L.; Ezsoel, G.; Perneczky, L. [KFKI Atomic Energy Research Institute, Budapest (Hungary)

    2001-07-01

    Due to the specific features of the VVER-440/213-type reactors the transient behaviour of such a reactor system is different from the usual PWR system behaviour. To provide an experimental database for the transient behaviour of VVER systems the PMK integral-type facility, the scaled down model of the Paks NPP was designed and constructed in the early 1980's. Since the start-up of the facility 48 experiments have been performed. It was confirmed through the experiments that the facility is a suitable tool for the computer code validation experiments and to the identification of basic thermal-hydraulic phenomena occurring during plant accidents. High international interest was shown by the four Standard Problem Exercises of the IAEA and by the projects financed by the EU-PHARE. A wide range of small- and medium-size LOCA sequences have been studied to know the performance and effectiveness of ECC systems and to evaluate the thermal-hydraulic safety of the core. Extensive studies have been performed to investigate the one- and two-phase natural circulation, the effect of disturbances coming from the secondary circuit and to validate the effectiveness of accident management measures like bleed and feed. The VVER-specific case, the opening of the SG collector cover was also extensively investigated. Examples given in the report show a few results of experiments and the results of calculation analyses performed for validation purposes of codes like RELAP5, ATHLET and CATHARE. There are some other white spots in Cross Reference Matrices for VVER reactors and, therefore, further experiments are planned to perform tests primarily in further support of accident management measures at low power states of plants to facilitate the improved safety management of VVER-440-type reactors. (authors)

  19. Results of 15 years experiments in the PMK-2 integral-type facility for VVERs

    International Nuclear Information System (INIS)

    Szabados, L.; Ezsoel, G.; Perneczky, L.

    2001-01-01

    Due to the specific features of the VVER-440/213-type reactors the transient behaviour of such a reactor system is different from the usual PWR system behaviour. To provide an experimental database for the transient behaviour of VVER systems the PMK integral-type facility, the scaled down model of the Paks NPP was designed and constructed in the early 1980's. Since the start-up of the facility 48 experiments have been performed. It was confirmed through the experiments that the facility is a suitable tool for the computer code validation experiments and to the identification of basic thermal-hydraulic phenomena occurring during plant accidents. High international interest was shown by the four Standard Problem Exercises of the IAEA and by the projects financed by the EU-PHARE. A wide range of small- and medium-size LOCA sequences have been studied to know the performance and effectiveness of ECC systems and to evaluate the thermal-hydraulic safety of the core. Extensive studies have been performed to investigate the one- and two-phase natural circulation, the effect of disturbances coming from the secondary circuit and to validate the effectiveness of accident management measures like bleed and feed. The VVER-specific case, the opening of the SG collector cover was also extensively investigated. Examples given in the report show a few results of experiments and the results of calculation analyses performed for validation purposes of codes like RELAP5, ATHLET and CATHARE. There are some other white spots in Cross Reference Matrices for VVER reactors and, therefore, further experiments are planned to perform tests primarily in further support of accident management measures at low power states of plants to facilitate the improved safety management of VVER-440-type reactors. (authors)

  20. Environmental Protection Agency (EPA) Facility Registry Service (FRS) Emergency Response (ER) Toxic Substances Control Act (TSCA) Facilities - Oil and Hazardous Materials

    Data.gov (United States)

    Department of Homeland Security — The purpose of this web feature service is to provide users with access to integrated facility information from FRS, limited to the subset of facilities that link to...

  1. Performance of Shiva as a laser fusion irradiation facility

    International Nuclear Information System (INIS)

    Speck, D.R.; Bliss, E.S.; Glaze, J.A.; Johnson, B.C.; Manes, K.R.; Ozarski, R.G.; Rupert, P.R.; Simmons, W.W.; Swift, C.D.; Thompson, C.E.

    1979-01-01

    Shiva is a 20 beam Nd:Glass Laser and Target Irradiation Facility at the Lawrence Livermore Laboratory. The laser system and integrated target facility evolved during the last year from a large, untested, experimental laser system to a target irradiation facility which has provided significant laser driven inertial confinement fusion data. The operation of the facility is discussed

  2. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  3. MIMI: Multimodality, Multiresource, Information Integration Environment for Biomedical Core Facilities

    OpenAIRE

    Szymanski, Jacek; Wilson, David L.; Zhang, Guo-Qiang

    2007-01-01

    The rapid expansion of biomedical research has brought substantial scientific and administrative data management challenges to modern core facilities. Scientifically, a core facility must be able to manage experimental workflow and the corresponding set of large and complex scientific data. It must also disseminate experimental data to relevant researchers in a secure and expedient manner that facilitates collaboration and provides support for data interpretation and analysis. Administrativel...

  4. Integration of Biosafety into Core Facility Management

    OpenAIRE

    Fontes, Benjamin

    2013-01-01

    This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core l...

  5. Design of the PRIDE Facility

    International Nuclear Information System (INIS)

    You, Gil Sung; Choung, Won Myung; Lee, Eun Pyo; Cho, Il Je; Kwon, Kie Chan; Hong, Dong Hee; Lee, Won Kyung; Ku, Jeong Hoe

    2009-01-01

    From 2007, KAERI is developing a PyRoprocess Integrated inactive DEmonstration facility (the PRIDE facility). The maximum annual treatment capacity of this facility will be a 10 ton-HM. The process will use a natural uranium feed material or a natural uranium mixed with some surrogate material for a simulation of a spent fuel. KAERI has also another plan to construct a demonstration facility which can treat a real spent fuel by pyroprocessing. This facility is called by ESPF, Engineering Scale Pyroprocess Facility. The ESPF will have the same treatment capability of spent fuel with the PRIDE facility. The only difference between the PRIDE and the ESPF is a radiation shielding capability. From the PRIDE facility designing works and demonstration with a simulated spent fuel after construction, it will be able to obtain the basic facility requirements, remote operability, interrelation properties between process equipment for designing of the ESPF. The flow sheet of the PRIDE processes is composed of five main processes, such as a decladding and voloxidation, an electro-reduction, an electrorefining, an electro-winning, and a salt waste treatment. The final products from the PRIDE facility are a simulated TRU metal and U metal ingot

  6. Nuclear criticality safety program at the Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lell, R.M.; Fujita, E.K.; Tracy, D.B.; Klann, R.T.; Imel, G.R.; Benedict, R.W.; Rigg, R.H.

    1994-01-01

    The Fuel Cycle Facility (FCF) is designed to demonstrate the feasibility of a novel commercial-scale remote pyrometallurgical process for metallic fuels from liquid metal-cooled reactors and to show closure of the Integral Fast Reactor (IFR) fuel cycle. Requirements for nuclear criticality safety impose the most restrictive of the various constraints on the operation of FCF. The upper limits on batch sizes and other important process parameters are determined principally by criticality safety considerations. To maintain an efficient operation within appropriate safety limits, it is necessary to formulate a nuclear criticality safety program that integrates equipment design, process development, process modeling, conduct of operations, a measurement program, adequate material control procedures, and nuclear criticality analysis. The nuclear criticality safety program for FCF reflects this integration, ensuring that the facility can be operated efficiently without compromising safety. The experience gained from the conduct of this program in the Fuel cycle Facility will be used to design and safely operate IFR facilities on a commercial scale. The key features of the nuclear criticality safety program are described. The relationship of these features to normal facility operation is also described

  7. Review of the Tritium Extraction Facility design

    International Nuclear Information System (INIS)

    Barton, R.W.; Bamdad, F.; Blackman, J.

    2000-01-01

    The Defense Nuclear Facilities Safety Board (DNFSB) is an independent executive branch agency responsible for technical safety oversight of the US Department of Energy's (DOE's) defense nuclear facilities. One of DNFSB's responsibilities is the review of design and construction projects for DOE's defense nuclear facilities to ensure that adequate health and safety requirements are identified and implemented. These reviews are performed with the expectation that facility designs are being developed within the framework of a site's Integrated Safety Management (ISM) program. This paper describes the application of ISM principles in DNFSB's ongoing review of the Tritium Extraction Facility (TEF) design/construction project

  8. Review of the Tritium Extraction Facility Design

    International Nuclear Information System (INIS)

    Ronald W. Barton; Farid Bamdad; Joel Blackman

    2000-01-01

    The Defense Nuclear Facilities Safety Board (DNFSB) is an independent executive branch agency responsible for technical safety oversight of the U.S. Department of Energy's (DOE's) defense nuclear facilities. One of DNFSB's responsibilities is the review of design and construction projects for DOE's defense nuclear facilities to ensure that adequate health and safety requirements are identified and implemented. These reviews are performed with the expectation that facility designs are being developed within the framework of a site's Integrated Safety Management (ISM) program. This paper describes the application of ISM principles in DNFSB's ongoing review of the Tritium Extraction Facility (TEF) design/construction project

  9. Evaluation of the Netherlands' International Test Facility for Smart Grids

    Energy Technology Data Exchange (ETDEWEB)

    Palmintier, Bryan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Pratt, Annabelle [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-06-01

    The Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland, or RVO) engaged the U.S. National Renewable Energy Laboratory (NREL) for two primary purposes: to evaluate the International Test Facility for Smart Grids (ITF) sponsored by RVO and to learn best practices for integrated test facilities from NREL's Energy Systems Integration Facility (ESIF). This report covers the ITF evaluation and is largely based on a one-week visit to the Netherlands in November 2014.

  10. Marketing Sports Facilities: Perspectives from Botswana

    Science.gov (United States)

    Bohutsana, Basuti; Akpata, Dele

    2013-01-01

    The provision of sports facilities contributes immensely to the growth of sports and leisure activities in the countries where they are provided. In some countries, as was the case in Botswana, the government had to spend millions of dollars to provide new Integrated Sports Facilities (ISF's) as a panacea for the continued poor performance of its…

  11. Performance specifications for proton medical facility

    Energy Technology Data Exchange (ETDEWEB)

    Chu, W.T.; Staples, J.W.; Ludewigt, B.A.; Renner, T.R.; Singh, R.P.; Nyman, M.A.; Collier, J.M.; Daftari, I.K.; Petti, P.L.; Alonso, J.R. [Lawrence Berkeley Lab., CA (United States); Kubo, H.; Verhey, L.J. [University of California Davis Medical Center, Sacramento, CA (United States). Cancer Center]|[California Univ., San Francisco, CA (United States). School of Medicine; Castro, J.R. [Lawrence Berkeley Lab., CA (United States)]|[University of California Davis Medical Center, Sacramento, CA (United States). Cancer Center]|[California Univ., San Francisco, CA (United States). School of Medicine

    1993-03-01

    Performance specifications of technical components of a modern proton radiotherapy facility are presented. The technical items specified include: the accelerator; the beam transport system including rotating gantry; the treatment beamline systems including beam scattering, beam scanning, and dosimetric instrumentation; and an integrated treatment and accelerator control system. Also included are treatment ancillary facilities such as diagnostic tools, patient positioning and alignment devices, and treatment planning systems. The facility specified will accommodate beam scanning enabling the three-dimensional conformal therapy deliver .

  12. Research on common methods for evaluating the operation effect of integrated wastewater treatment facilities of iron and steel enterprises

    Science.gov (United States)

    Bingsheng, Xu

    2017-04-01

    Considering the large quantities of wastewater generated from iron and steel enterprises in China, this paper is aimed to research the common methods applied for evaluating the integrated wastewater treatment effect of iron and steel enterprises. Based on survey results on environmental protection performance, technological economy, resource & energy consumption, services and management, an indicator system for evaluating the operation effect of integrated wastewater treatment facilities is set up. By discussing the standards and industrial policies in and out of China, 27 key secondary indicators are further defined on the basis of investigation on main equipment and key processes for wastewater treatment, so as to determine the method for setting key quantitative and qualitative indicators for evaluation indicator system. It is also expected to satisfy the basic requirements of reasonable resource allocation, environmental protection and sustainable economic development, further improve the integrated wastewater treatment effect of iron and steel enterprises, and reduce the emission of hazardous substances and environmental impact.

  13. Integrative approach for wastewater treatment facilities with biomass transformation into energy

    Directory of Open Access Journals (Sweden)

    Anker Yaakov

    2017-01-01

    Full Text Available Current industrial environmental regulations favor processes with Integrative Pollution Prevention and Control (IPPC. While several systems are regarded by different international directives as IPPC Best Available Techniques or Technologies (BAT, none of these systems are capable handling various pollutants of both gaseous and aquatic effluents. Additional hinder to a BAT-IPPC complete procedure are hazardous or uneconomical byproducts of the IPPC processes and significant auxiliary costs for consumables and energy. The current research and subsequent projects are aimed to the development of a Biological Integrative Pollution Prevention and Control (Bio-IPPC system. Such system can be incorporated in various industrial processes, in a way that the byproduct is without hazardous potential and may be used as an economical raw material. The main initiative and heart of these systems is a micro-algae reactor, which is capable of treating various types of industrial pollutants both in the gaseous and aquatic phases. The algae nutrition is through thin-film circulation of the aquatic effluent and the reactor atmosphere is enriched by flue gases. The excessive algal biomass may be utilized for economic purposes starting with animal feedstock, through organic fertilizer and as industrial raw material for biofuels production or direct energy production. The first industrial project is a wastewater (WW polishing stage to an industry zone WW treatment facility, which ensures high level effluent purification and assimilation of greenhouse gases, which are released during the WW bioremediation process. The second industrial application aims to treat aquatic and gaseous effluents from coal propelled power plants. The raw algal material from both projects although very different, is used for the development of new efficient scheme for bioethanol production. In summary, the system presented is an actual Bio-IPPC that can interactively treat several industrial

  14. Improving aircraft accident forecasting for an integrated plutonium storage facility

    International Nuclear Information System (INIS)

    Rock, J.C.; Kiffe, J.; McNerney, M.T.; Turen, T.A.

    1998-06-01

    Aircraft accidents pose a quantifiable threat to facilities used to store and process surplus weapon-grade plutonium. The Department of Energy (DOE) recently published its first aircraft accident analysis guidelines: Accident Analysis for Aircraft Crash into Hazardous Facilities. This document establishes a hierarchy of procedures for estimating the small annual frequency for aircraft accidents that impact Pantex facilities and the even smaller frequency of hazardous material released to the environment. The standard establishes a screening threshold of 10 -6 impacts per year; if the initial estimate of impact frequency for a facility is below this level, no further analysis is required. The Pantex Site-Wide Environmental Impact Statement (SWEIS) calculates the aircraft impact frequency to be above this screening level. The DOE Standard encourages more detailed analyses in such cases. This report presents three refinements, namely, removing retired small military aircraft from the accident rate database, correcting the conversion factor from military accident rates (accidents per 100,000 hours) to the rates used in the DOE model (accidents per flight phase), and adjusting the conditional probability of impact for general aviation to more accurately reflect pilot training and local conditions. This report documents a halving of the predicted frequency of an aircraft impact at Pantex and points toward further reductions

  15. Nondestructive assay system development for a plutonium scrap recovery facility

    International Nuclear Information System (INIS)

    Hsue, S.T.; Baker, M.P.

    1984-01-01

    A plutonium scrap recovery facility is being constructed at the Savannah River Plant (SRP). The safeguards groups of the Los Alamos National Laboratory have been working since the early design stage of the facility with SRP and other national laboratories to develop a state-of-the-art assay system for this new facility. Not only will the most current assay techniques be incorporated into the system, but also the various nondestructive assay (NDA) instruments are to be integrated with an Instrument Control Computer (ICC). This undertaking is both challenging and ambitious; an entire assay system of this type has never been done before in a working facility. This paper will describe, in particular, the effort of the Los Alamos Safeguards Assay Group in this endeavor. Our effort in this project can be roughly divided into three phases: NDA development, system integration, and integral testing. 6 references

  16. Thermal Hydraulic Integral Effect Tests for Pressurized Water Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Baek, W. P.; Song, C. H.; Kim, Y. S. and others

    2005-02-15

    The objectives of the project are to construct a thermal-hydraulic integral effect test facility and to perform various integral effect tests for design, operation, and safety regulation of pressurized water reactors. During the first phase of this project (1997.8{approx}2002.3), the basic technology for thermal-hydraulic integral effect tests was established and the basic design of the test facility was accomplished: a full-height, 1/300-volume-scaled full pressure facility for APR1400, an evolutionary pressurized water reactor that was developed by Korean industry. Main objectives of the present phase (2002.4{approx}2005.2), was to optimize the facility design and to construct the experimental facility. We have performed following researches: 1) Optimization of the basic design of the thermal-hydraulic integral effect test facility for PWRs - ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation) - Reduced height design for APR1400 (+ specific design features of KSNP safety injection systems) - Thermal-hydraulic scaling based on three-level scaling methodology by Ishii et al. 2) Construction of the ATLAS facility - Detailed design of the test facility - Manufacturing and procurement of components - Installation of the facility 3) Development of supporting technology for integral effect tests - Development and application of advanced instrumentation technology - Preliminary analysis of test scenarios - Development of experimental procedures - Establishment and implementation of QA system/procedure.

  17. Facility effluent monitoring plan for the 300 Area Fuels Fabrication Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Brendel, D.F.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring system by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The Fuel Fabrication Facility in the Hanford 300 Area supported the production reactors from the 1940's until they were shut down in 1987. Prior to 1987 the Fuel Fabrication Facility released both airborne and liquid radioactive effluents. In January 1987 the emission of airborne radioactive effluents ceased with the shutdown of the fuels facility. The release of liquid radioactive effluents have continued although decreasing significantly from 1987 to 1990

  18. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, W.E.

    2000-03-08

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

  19. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    International Nuclear Information System (INIS)

    DAVIS, W.E.

    2000-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years

  20. Experimental evaluation of emergency operating procedures on multiple steam generator tube rupture in INER integral system test facility

    International Nuclear Information System (INIS)

    Liu, T.J.; Lin, Y.M.; Lee, C.H.; Chang, C.Y.; Hong, W.T.

    1997-01-01

    The multiple steam generator tube rupture (SGTR) scenario in Westinghouse type pressurized water reactor (PWR) has been investigated at the Institute of Nuclear Energy Research (INER) Integral System Test (IIST) facility. This reduced-height and reduced-pressure test facility was designed to simulate the main features of Maanshan nuclear power plant. The SGTR test scenario assumes the double-ended break of one-, two- and six- tubes without other failures. The major operator actions follow the related symptom-oriented Emergency Operating Procedure (EOP) on the reference plant. This study focuses on the investigation of thermal-hydraulics phenomena and the adequacy of associated EOP to limit primary-to-secondary leakage. Through this study, it is found that the adequacy of current EOP in minimizing the radioactivity release demands early substantial operator involvement, especially in the multi-tubes break events. Also, the detailed mechanism of the main thermal-hydraulic phenomena during the SGTR transient are explored. (author)

  1. Integrated, long term, sustainable, cost effective biosolids management at a large Canadian wastewater treatment facility.

    Science.gov (United States)

    Leblanc, R J; Allain, C J; Laughton, P J; Henry, J G

    2004-01-01

    The Greater Moncton Sewerage Commission's 115,000 m3/d advanced, chemically assisted primary wastewater treatment facility located in New Brunswick, Canada, has developed an integrated, long term, sustainable, cost effective programme for the management and beneficial utilization of biosolids from lime stabilized raw sludge. The paper overviews biosolids production, lime stabilization, conveyance, and odour control followed by an indepth discussion of the wastewater sludge as a resource programme, namely: composting, mine site reclamation, landfill cover, land application for agricultural use, tree farming, sod farm base as a soil enrichment, topsoil manufacturing. The paper also addresses the issues of metals, pathogens, organic compounds, the quality control program along with the regulatory requirements. Biosolids capital and operating costs are presented. Research results on removal of metals from primary sludge using a unique biological process known as BIOSOL as developed by the University of Toronto, Canada to remove metals and destroy pathogens are presented. The paper also discusses an ongoing cooperative research project with the Université de Moncton where various mixtures of plant biosolids are composted with low quality soil. Integration, approach to sustainability and "cumulative effects" as part of the overall biosolids management strategy are also discussed.

  2. Integration of the nuclear energy among the production facilities of energy in France; Integration de l'energie nucleaire parmi les moyens de production de l'energie en france

    Energy Technology Data Exchange (ETDEWEB)

    Ailleret, P [Electricite de France (EDF), 75 - Paris (France). Direction des Etudes et Recherches; Taranger, P [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1955-07-01

    The present report gives an overview of the present facilities of energy productions in France and their perspectives. the electric production comes for half about power stations hydraulics and for half of thermal power stations. However due to the increase of the energy consumption, France is particularly interested by the atomic energy that appears to bring a supply in due time to the hydraulics and to limit a development of the thermal power stations to which the natural resources of France in classic fuel would not permit to cope presumably. The integration of the nuclear plants to the other production facilities will make itself gradually according to the evolution of the energy needs. (M.B.) [French] Le present rapport donne un apercu des moyens actuels de productions energetiques en France et de ses perspectives. la production electrique provient pour moitie environ de centrales hydraulique et pour moitie de centrales thermiques. Cependant face a l'augmentation de la consommation energetique, la France est tres particulierement interessee par l'energie atomique qui parait devoir apporter en temps utile la releve a l'hydraulique et limiter un developpement des centrales thermiques auxquels les ressources naturelles de la France en combustible classique ne permettraient vraisemblablement pas de faire face. L'integration des centrales nucleaires aux autres moyens de production se fera graduellment en fonction de l'evolution des besoins energetiques. (M.B.)

  3. Hydrogen Infrastructure Testing and Research Facility Video (Text Version)

    Science.gov (United States)

    grid integration, continuous code improvement, fuel cell vehicle operation, and renewable hydrogen Systems Integration Facility or ESIF. Research projects including H2FIRST, component testing, hydrogen

  4. Microgrids | Energy Systems Integration Facility | NREL

    Science.gov (United States)

    . Diesel generators: because diesel generators are traditional microgrid components, three different generator sets with various control options are available for microgrid integration efforts. DC power supplies: the ESIF's full suite of DC simulation capability includes a 1.5-MW photovoltaic (PV) simulator

  5. Facility Effluent Monitoring Plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Carter, G.J.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updates as a minimum every three years

  6. Design of a hydrogen test facility

    International Nuclear Information System (INIS)

    Morgan, M.J.; Beam, J.E.; Sehmbey, M.S.; Pais, M.R.; Chow, L.C.; Hahn, O.J.

    1992-01-01

    The Air Force has sponsored a program at the University of Kentucky which will lead to a better understanding of the thermal and fluid instabilities during blowdown of supercritical fluids at cryogenic temperatures. An integral part of that program is the design and construction of that hydrogen test facility. This facility will be capable of providing supercritical hydrogen at 30 bars and 35 K at a maximum flow rate of 0.1 kg/s for 90 seconds. Also presented here is an extension of this facility to accommodate the use of supercritical helium

  7. Counterpart experimental study of ISP-42 PANDA tests on PUMA facility

    International Nuclear Information System (INIS)

    Yang, Jun; Choi, Sung-Won; Lim, Jaehyok; Lee, Doo-Yong; Rassame, Somboon; Hibiki, Takashi; Ishii, Mamoru

    2013-01-01

    Highlights: ► Counterpart tests were performed on two large-scale BWR integral facilities. ► Similarity of post-LOCA system behaviors observed between two tests. ► Passive core and containment cooling systems work as design in both tests. -- Abstract: A counterpart test to the Passive Nachwärmeabfuhr und Druckabbau Test Anlage (Passive Decay Heat Removal and Depressurization Test Facility, PANDA) International Standard Problem (ISP)-42 test was conducted at the Purdue University Multi-Dimensional Integral Test Assembly (PUMA) facility. Aimed to support code validation on a range of light water reactor (LWR) containment issues, the ISP-42 test consists of six sequential phases (Phases A–F) with separately defined initial and boundary conditions, addressing different stages of anticipated accident scenario and system responses. The counterpart test was performed from Phases A to D, which are within the scope of the normal integral tests performed on the PUMA facility. A scaling methodology was developed by using the PANDA facility as prototype and PUMA facility as test model, and an engineering scaling has been applied to the PUMA facility. The counterpart test results indicated that functions of passive safety systems, such as passive containment cooling system (PCCS) start-up, gravity-driven cooling system (GDCS) discharge, PCCS normal operation and overload function were confirmed in both the PANDA and PUMA facilities with qualitative similarities

  8. Determinants of Integrated Management of Childhood Illness (IMCI) non-severe pneumonia classification and care in Malawi health facilities: Analysis of a national facility census.

    Science.gov (United States)

    Johansson, Emily White; Nsona, Humphreys; Carvajal-Aguirre, Liliana; Amouzou, Agbessi; Hildenwall, Helena

    2017-12-01

    Research shows inadequate Integrated Management of Childhood Illness (IMCI)-pneumonia care in various low-income settings but evidence is largely from small-scale studies with limited evidence of patient-, provider- and facility-levels determinants of IMCI non-severe pneumonia classification and its management. The Malawi Service Provision Assessment 2013-2014 included 3149 outpatients aged 2-59 months with completed observations, interviews and re-examinations. Mixed-effects logistic regression models quantified the influence of patient-, provider and facility-level determinants on having IMCI non-severe pneumonia and its management in observed consultations. Among 3149 eligible outpatients, 590 (18.7%) had IMCI non-severe pneumonia classification in re-examination. 228 (38.7%) classified cases received first-line antibiotics and 159 (26.9%) received no antibiotics. 18.6% with cough or difficult breathing had 60-second respiratory rates counted during consultations, and conducting this assessment was significantly associated with IMCI training ever received (odds ratio (OR) = 2.37, 95% confidence interval (CI): 1.29-4.31) and negative rapid diagnostic test results (OR = 3.21, 95% CI: 1.45-7.13). Older children had lower odds of assessments than infants (OR = 48-59 months: 0.35, 95% CI: 0.16-0.75). Children presenting with any of the following complaints also had reduced odds of assessment: fever, diarrhea, skin problem or any danger sign. First-line antibiotic treatment for classified cases was significantly associated with high temperatures (OR = 3.26, 95% CI: 1.24-8.55) while older children had reduced odds of first-line treatment compared to infants (OR = 48-59 months: 0.29, 95% CI: 0.10-0.83). RDT-confirmed malaria was a significant predictor of no antibiotic receipt for IMCI non-severe pneumonia (OR = 10.65, 95% CI: 2.39-47.36). IMCI non-severe pneumonia care was sub-optimal in Malawi health facilities in 2013-2014 with inadequate

  9. Facility effluent monitoring plan for the Waste Receiving and Processing Facility Module 1

    International Nuclear Information System (INIS)

    Lewis, C.J.

    1995-10-01

    A facility effluent monitoring plan is required by the US Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal state, and local requirements. This facility effluent monitoring plan shall ensure lonq-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  10. Evaluation of existing United States' facilities for use as a mixed-oxide (MOX) fuel fabrication facility for plutonium disposition

    International Nuclear Information System (INIS)

    Beard, C.A.; Buksa, J.J.; Chidester, K.; Eaton, S.L.; Motley, F.E.; Siebe, D.A.

    1995-01-01

    A number of existing US facilities were evaluated for use as a mixed-oxide fuel fabrication facility for plutonium disposition. These facilities include the Fuels Material Examination Facility (FMEF) at Hanford, the Washington Power Supply Unit 1 (WNP-1) facility at Hanford, the Barnwell Nuclear Fuel Plant (BNFP) at Barnwell, SC, the Fuel Processing Facility (FPF) at Idaho National Engineering Laboratory (INEL), the Device Assembly Facility (DAF) at the Nevada Test Site (NTS), and the P-reactor at the Savannah River Site (SRS). The study consisted of evaluating each facility in terms of available process space, available building support systems (i.e., HVAC, security systems, existing process equipment, etc.), available regional infrastructure (i.e., emergency response teams, protective force teams, available transportation routes, etc.), and ability to integrate the MOX fabrication process into the facility in an operationally-sound manner that requires a minimum amount of structural modifications

  11. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  12. 1998 interim 242-A Evaporator tank system integrity assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  13. 1998 interim 242-A Evaporator tank system integrity assessment report

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ''dangerous waste storage or treatment tank and its ancillary equipment and containment.'' This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD

  14. The NAF: National analysis facility at DESY

    International Nuclear Information System (INIS)

    Haupt, Andreas; Kemp, Yves

    2010-01-01

    Within the framework of a broad collaboration among German particle physicists, the strategic Helmholtz Alliance P hysics a the Terascale , an analysis facility has been set up at DESY. The facility is intended to provide the best possible analysis infrastructure for researches of the ATLAS, CMS, LHCb and ILC experiments and also for theory researchers. In a first part of the contribution, we will present the concept of the NAF and its place in the existing distributed grid landscape of the experiments. In a second part, the building blocks of the NAF will be detailed with an emphasis on technical implementations of some parts: - Usage of VOMS for separating grid resources between collaboration-wide and NAF-specific resources. - interactive and batch cluster and integration with PROOF. - usage of grid proxies to access work group servers and AFS. - the usage and operation of Lustre for fast data access. A special focus is the seamless integration of the facility into the two geographically separated DESY sites and its implications. In a third part, the experience of running the facility for one year will be reported.

  15. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This document, Volume 5 Book 7, contains cost estimate information for a monitored retrievable storage (MRS) facility. Cost estimates are for onsite improvements, waste storage, and offsite improvements for the Clinch River Site

  16. Chemical Entity Semantic Specification: Knowledge representation for efficient semantic cheminformatics and facile data integration

    Science.gov (United States)

    2011-01-01

    Background Over the past several centuries, chemistry has permeated virtually every facet of human lifestyle, enriching fields as diverse as medicine, agriculture, manufacturing, warfare, and electronics, among numerous others. Unfortunately, application-specific, incompatible chemical information formats and representation strategies have emerged as a result of such diverse adoption of chemistry. Although a number of efforts have been dedicated to unifying the computational representation of chemical information, disparities between the various chemical databases still persist and stand in the way of cross-domain, interdisciplinary investigations. Through a common syntax and formal semantics, Semantic Web technology offers the ability to accurately represent, integrate, reason about and query across diverse chemical information. Results Here we specify and implement the Chemical Entity Semantic Specification (CHESS) for the representation of polyatomic chemical entities, their substructures, bonds, atoms, and reactions using Semantic Web technologies. CHESS provides means to capture aspects of their corresponding chemical descriptors, connectivity, functional composition, and geometric structure while specifying mechanisms for data provenance. We demonstrate that using our readily extensible specification, it is possible to efficiently integrate multiple disparate chemical data sources, while retaining appropriate correspondence of chemical descriptors, with very little additional effort. We demonstrate the impact of some of our representational decisions on the performance of chemically-aware knowledgebase searching and rudimentary reaction candidate selection. Finally, we provide access to the tools necessary to carry out chemical entity encoding in CHESS, along with a sample knowledgebase. Conclusions By harnessing the power of Semantic Web technologies with CHESS, it is possible to provide a means of facile cross-domain chemical knowledge integration with full

  17. Experimental Studies for the VVER-440/213 Bubble Condenser System for Kola NPP at the Integral Test Facility BC V-213

    International Nuclear Information System (INIS)

    Blinkov, V.N.; Melikhov, O.I.; Melikhov, V.I.; Davydov, M.V.; Wolff, H.; Arndt, S.

    2012-01-01

    In the frame of Tacis Project R2.01/99, which was running from 2003 to 2005, the bubble condenser system of Kola NPP (unit 3) was qualified at the integral test facility BC V-213. Three LB LOCA tests, two MSLB tests, and one SB LOCA test were performed. The appropriate test scenarios for BC V-213 test facility, modeling accidents in the Kola NPP unit 3, were determined with pretest calculations. Analysis of test results has shown that calculated initial conditions and test scenarios were properly reproduced in the tests. The detailed posttest analysis of the tests performed at BC V-213 test facility was aimed to validate the COCOSYS code for the calculation of thermohydraulic processes in the hermetic compartments and bubble condenser. After that the validated COCOSYS code was applied to NPP calculations for Kola NPP (unit 3). Results of Tacis R2.01/99 Project confirmed the bubble condenser functionality during large and small break LOCAs and MSLB accidents. Maximum loads were reached in the LB LOCA case. No condensation oscillations were observed.

  18. HNF - Helmholtz Nano Facility

    Directory of Open Access Journals (Sweden)

    Wolfgang Albrecht

    2017-05-01

    Full Text Available The Helmholtz Nano Facility (HNF is a state-of-the-art cleanroom facility. The cleanroom has ~1100 m2 with cleanroom classes of DIN ISO 1-3. HNF operates according to VDI DIN 2083, Good Manufacturing Practice (GMP and aquivalent to Semiconductor Industry Association (SIA standards. HNF is a user facility of Forschungszentrum Jülich and comprises a network of facilities, processes and systems for research, production and characterization of micro- and nanostructures. HNF meets the basic supply of micro- and nanostructures for nanoelectronics, fluidics. micromechanics, biology, neutron and energy science, etc.. The task of HNF is rapid progress in nanostructures and their technology, offering efficient access to infrastructure and equipment. HNF gives access to expertise and provides resources in production, synthesis, characterization and integration of structures, devices and circuits. HNF covers the range from basic research to application oriented research facilitating a broad variety of different materials and different sample sizes.

  19. An application of the value tree analysis methodology within the integrated risk informed decision making for the nuclear facilities

    International Nuclear Information System (INIS)

    Borysiewicz, Mieczysław; Kowal, Karol; Potempski, Sławomir

    2015-01-01

    A new framework of integrated risk informed decision making (IRIDM) has been recently developed in order to improve the risk management of the nuclear facilities. IRIDM is a process in which qualitatively different inputs, corresponding to different types of risk, are jointly taken into account. However, the relative importance of the IRIDM inputs and their influence on the decision to be made is difficult to be determined quantitatively. An improvement of this situation can be achieved by application of the Value Tree Analysis (VTA) methods. The aim of this article is to present the VTA methodology in the context of its potential usage in the decision making on nuclear facilities. The benefits of the VTA application within the IRIDM process were identified while making the decision on fuel conversion of the research reactor MARIA. - Highlights: • New approach to risk informed decision making on nuclear facilities was postulated. • Value tree diagram was developed for decision processes on nuclear installations. • An experiment was performed to compare the new approach with the standard one. • Benefits of the new approach were reached in fuel conversion of a research reactor. • The new approach makes the decision making process more transparent and auditable

  20. Insight into implementation of facility-based integrated management of childhood illness strategy in a rural district of Sindh, Pakistan.

    Science.gov (United States)

    Pradhan, Nousheen Akber; Rizvi, Narjis; Sami, Neelofar; Gul, Xaher

    2013-07-05

    Integrated management of childhood illnesses (IMCI) strategy has been proven to improve health outcomes in children under 5 years of age. Pakistan, despite being in the late implementation phase of the strategy, continues to report high under-five mortality due to pneumonia, diarrhea, measles, and malnutrition - the main targets of the strategy. The study determines the factors influencing IMCI implementation at public-sector primary health care (PHC) facilities in Matiari district, Sindh, Pakistan. An exploratory qualitative study with an embedded quantitative strand was conducted. The qualitative part included 16 in-depth interviews (IDIs) with stakeholders which included planners and policy makers at a provincial level (n=5), implementers and managers at a district level (n=3), and IMCI-trained physicians posted at PHC facilities (n=8). Quantitative part included PHC facility survey (n=16) utilizing WHO health facility assessment tool to assess availability of IMCI essential drugs, supplies, and equipments. Qualitative content analysis was used to interpret the textual information, whereas descriptive frequencies were calculated for health facility survey data. The major factors reported to enhance IMCI implementation were knowledge and perception about the strategy and need for separate clinic for children aged under 5 years as potential support factors. The latter can facilitate in strategy implementation through allocated workforce and required equipments and supplies. Constraint factors mainly included lack of clear understanding of the strategy, poor planning for IMCI implementation, ambiguity in defined roles and responsibilities among stakeholders, and insufficient essential supplies and drugs at PHC centers. The latter was further substantiated through health facilities' survey findings, which indicated that none of the facilities had 100% stock of essential supplies and drugs. Only one out of all 16 surveyed facilities had 75% of the total supplies

  1. Integrated assessment of a new Waste-to-Energy facility in Central Greece in the context of regional perspectives

    International Nuclear Information System (INIS)

    Perkoulidis, G.; Papageorgiou, A.; Karagiannidis, A.; Kalogirou, S.

    2010-01-01

    The main aim of this study is the integrated assessment of a proposed Waste-to-Energy facility that could contribute in the Municipal Solid Waste Management system of the Region of Central Greece. In the context of this paper alternative transfer schemes for supplying the candidate facility were assessed considering local conditions and economical criteria. A mixed-integer linear programming model was applied for the determination of optimum locations of Transfer Stations for an efficient supplying chain between the waste producers and the Waste-to-Energy facility. Moreover different Regional Waste Management Scenarios were assessed against multiple criteria, via the Multi Criteria Decision Making method ELECTRE III. The chosen criteria were total cost, Biodegradable Municipal Waste diversion from landfill, energy recovery and Greenhouse Gas emissions and the analysis demonstrated that a Waste Management Scenario based on a Waste-to-Energy plant with an adjacent landfill for disposal of the residues would be the best performing option for the Region, depending however on the priorities of the decision makers. In addition the study demonstrated that efficient planning is necessary and the case of three sanitary landfills operating in parallel with the WtE plant in the study area should be avoided. Moreover alternative cases of energy recovery of the candidate Waste-to-Energy facility were evaluated against the requirements of the new European Commission Directive on waste in order for the facility to be recognized as recovery operation. The latter issue is of high significance and the decision makers in European Union countries should take it into account from now on, in order to plan and implement facilities that recover energy efficiently. Finally a sensitivity check was performed in order to evaluate the effects of increased recycling rate, on the calorific value of treated Municipal Solid Waste and the gate fee of the candidate plant and found that increased

  2. Integrated, long term, sustainable, cost effective biosolids management at a large Canadian wastewater treatment facility

    Energy Technology Data Exchange (ETDEWEB)

    LeBlance, R.J.; Allain, C.J.; Laughton, P.J.; Henry, J.G.

    2003-07-01

    The Greater Moncton Sewerage Commission's 115 000 m{sup 3}/d advanced, chemically assisted primary wastewater treatment facility located in New Brunswick, Canada, has developed an integrated, long term, sustainable, cost effective programme for the management and beneficial utilization of biosolids from lime stabilized raw sludge. The paper overviews biosolids production, lime stabilization, conveyance, and odour control followed by an indepth discussion of the wastewater sludge as a resource programme, namely: composting, mine site reclamation, landfill cover, land application for agricultural use, tree farming, sod farm base as a soil enrichment, topsoil manufacturing. The paper also addresses the issues of metals, pathogens, organic compounds, the quality control program along with the regulatory requirements. Biosolids capital and operating costs are presented. Research results on removal of metals from primary sludge using a unique biological process known as BIOSOL as developed by the University of Toronto, Canada to remove metals and destroy pathogens are presented. The paper also discusses an ongoing cooperative research project with the Universite de Moncton where various mixtures of plant biosolids are composted with low quality soil. Integration, approach to sustainability and ''cumulative effects'' as part of the overall biosolids management strategy is also discussed. (author)

  3. Integrating Safeguards into the Pit Disassembly and Conversion Facility

    International Nuclear Information System (INIS)

    Clark, T.G.

    2002-01-01

    In September 2000, the United States and the Russian Federation entered into an agreement which stipulates each country will irreversibly transform 34 metric tons of weapons-grade plutonium into material which could not be used for weapon purposes. Supporting the Department of Energy's (DOE) program to dispose of excess nuclear materials, the Pit Disassembly and Conversion Facility (PDCF) is being designed and constructed to disassemble the weapon ''pits'' and convert the nuclear material to an oxide form for fabrication into reactor fuel at the separate Mixed Oxide Fuel Fabrication Facility. The PDCF design incorporates automation to the maximum extent possible to facilitate material safeguards, reduce worker dose, and improve processing efficiency. This includes provisions for automated guided vehicle movements for shipping containers, material transport via automated conveyor between processes, remote process control monitoring, and automated Nondestructive Assay product systems

  4. Facility effluent monitoring plan for the tank farms facilities

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.; Kenoyer, J.L.; Moeller, M.P.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum three years. A variety of liquid wastes are generated in processing treatment, and disposal operations throughout the Hanford Site. The Tank Farms Project serves a major role in Hanford Site waste management activities as the temporary repository for these wastes. Stored wastes include hazardous components regulated under the Resource Conservation and Recovery Act of 1976 (RCRA) and as by-product material regulated under the Atomic Energy Act of 1954. A total of 177 single- and double-shell tanks (SST and DST) have been constructed in the 200 East and 200 West Areas of the Hanford Site. These facilities were constructed to various designs from 1943 to 1986. The Tank Farms Project is comprised of these tanks along with various transfer, receiving, and treatment facilities

  5. CLAIMS OF SUSTAINABLE FACILITIES MANAGEMENT

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    Purpose: The purpose of the paper is to provide an overview of current practices within the emergent management discipline: Sustainable Facilities Management (SFM). Background: To develop a sustainable society, facilities managers must become change agents for sustainability in the built...... environment. Facilities Management (FM) is contributing to the environmental, social and economical problems, but can at the same time also be a part of the solution. However, to integrate sustainability in FM is still an emergent niche within FM, and the examples of SFM so far seems to come out of very......-creating of new socio-technical services and technologies These SFM understandings are concluded to be coexisting claims of SFM definitions. Practical Implications: Facilities managers will be able to identify the mindset behind different services and technologies that are promoted as SFM. But maybe just...

  6. Integrating biomedical and herbal medicine in Ghana

    DEFF Research Database (Denmark)

    Boateng, Millicent Addai; Danso-Appiah, Anthony; Turkson, Bernard Kofi

    2016-01-01

    Background: Over the past decade there has been growing interest in the use of herbal medicine both in developed and developing countries. Given the high proportion of patients using herbal medicine in Ghana, some health facilities have initiated implementation of herbal medicine as a component...... of their healthcare delivery. However, the extent to which herbal medicine has been integrated in Ghanaian health facilities, how integration is implemented and perceived by different stakeholders has not been documented. The study sought to explore these critical issues at the Kumasi South Hospital (KSH) and outline...... the definition, process and goals of integration were lacking, with respondents sharing different views about the purpose and value of integration of herbal medicine within public health facilities. Key informants were supportive of the initiative. Whilst biomedical health workers perceived the system...

  7. Scaling analysis for the OSU AP600 test facility (APEX)

    International Nuclear Information System (INIS)

    Reyes, J.N.

    1998-01-01

    In this paper, the authors summarize the key aspects of a state-of-the-art scaling analysis (Reyes et al. (1995)) performed to establish the facility design and test conditions for the advanced plant experiment (APEX) at Oregon State University (OSU). This scaling analysis represents the first, and most comprehensive, application of the hierarchical two-tiered scaling (H2TS) methodology (Zuber (1991)) in the design of an integral system test facility. The APEX test facility, designed and constructed on the basis of this scaling analysis, is the most accurate geometric representation of a Westinghouse AP600 nuclear steam supply system. The OSU APEX test facility has served to develop an essential component of the integral system database used to assess the AP600 thermal hydraulic safety analysis computer codes. (orig.)

  8. Technical support for open-cycle MHD program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-05-01

    The support program for open-cycle MHD at Argonne National Lab is developing the analytical tools needed to investigate the performance of the major components in the combined-cycle MHD/steam power system. The analytical effort is centered on the primary components of the system that are unique to MHD and also on the integration of these analytical representations into a model of the entire power producing system. The present project activities include modeling of the combustor, MHD channel, slag separator, and the high-temperature air preheater. In addition, these models are combined into a complete system model, which is at present capable of carrying out optimizations of the entire system on either thermodynamic efficiency or with less confidence, cost of electrical power. Also, in support of the open-cycle program, considerable effort has gone into the formulation of a CDIF Test Plan and a National MHD Test Program.

  9. Integrated leak rate testing of the fast flux test facility reactor containment building

    International Nuclear Information System (INIS)

    James, E.B.; Farabee, O.A.; Bliss, R.J.

    1978-01-01

    The initial Integrated Leak Rate Test (ILRT) of the Fast Flux Test Facility containment building was performed from May 27 to June 2, 1978. The test was conducted in air with systems vented and with the containment recirculating coolers in operation. 10 psig and 5 psig tests were run using the absolute pressure test method. The measured leakage rates were .033% Vol/24 hr. and -.0015% Vol/24 hrs. respectively. Subsequent verification tests at both 10 psig and 5 psig proved that the test equipment was operating properly and it was sensitive enough to detect leaks at low pressures. This ILRT was performed at a lower pressure than any previous ILRT on a reactor containment structure in the United States. While the initial design requirements for ice condenser containments called for a part pressure test at 6 psig, the tests were waived due to the apparent statistical problems of data analysis and the repeatability of the data itself at such low pressure. In contrast to this belief, both the 5 and 10 psig ILRT's were performed in a successful manner at FFTF

  10. Large laser system facility design

    International Nuclear Information System (INIS)

    Gilmartin, T.J.

    1983-01-01

    Optical stability of foundations and support structures, environmental control, close-in subsystem integration, spatial organization, materiel flow and access to remote subsystems is discussed and compared for four laser facilities: The Special Isotope Separation Laboratory, Argus, Shiva/Nova, and Firepond

  11. Sextant: an expert system for transient analysis of nuclear reactors and integral test facilities

    International Nuclear Information System (INIS)

    Barbet, N.; Dumas, M.; Mihelich, G.

    1987-01-01

    Expert systems provide a new way of dealing with the computer-aided management of nuclear plants by combining several knowledge bases and reasoning modes together with a set of numerical models for real-time analysis of transients. New development tools are required together with metaknowledge bases handling temporal hypothetical reasoning and planning. They have to be efficient and robust because during a transient, neither measurements nor models, nor scenarios are hold as absolute references. SEXTANT is a general purpose physical analyzer intended to provide a pattern and avoid duplication of general tools and knowledge bases for similar applications. It combines several knowledge bases concerning measurements, models and qualitative behavior of PWR with a mechanism of conjecture-refutation and a set of simplified models matching the current physical state. A prototype is under assessment by dealing with integral test facility transients. For its development, SEXTANT requires a powerful shell. SPIRAL is such a toolkit, oriented towards online analysis of complex processes and already used in several applications

  12. Insight into implementation of facility-based integrated management of childhood illness strategy in a rural district of Sindh, Pakistan

    Directory of Open Access Journals (Sweden)

    Nousheen Akber Pradhan

    2013-07-01

    Full Text Available Background: Integrated management of childhood illnesses (IMCI strategy has been proven to improve health outcomes in children under 5 years of age. Pakistan, despite being in the late implementation phase of the strategy, continues to report high under-five mortality due to pneumonia, diarrhea, measles, and malnutrition – the main targets of the strategy. Objective: The study determines the factors influencing IMCI implementation at public-sector primary health care (PHC facilities in Matiari district, Sindh, Pakistan. Design: An exploratory qualitative study with an embedded quantitative strand was conducted. The qualitative part included 16 in-depth interviews (IDIs with stakeholders which included planners and policy makers at a provincial level (n=5, implementers and managers at a district level (n=3, and IMCI-trained physicians posted at PHC facilities (n=8. Quantitative part included PHC facility survey (n=16 utilizing WHO health facility assessment tool to assess availability of IMCI essential drugs, supplies, and equipments. Qualitative content analysis was used to interpret the textual information, whereas descriptive frequencies were calculated for health facility survey data. Results: The major factors reported to enhance IMCI implementation were knowledge and perception about the strategy and need for separate clinic for children aged under 5 years as potential support factors. The latter can facilitate in strategy implementation through allocated workforce and required equipments and supplies. Constraint factors mainly included lack of clear understanding of the strategy, poor planning for IMCI implementation, ambiguity in defined roles and responsibilities among stakeholders, and insufficient essential supplies and drugs at PHC centers. The latter was further substantiated through health facilities’ survey findings, which indicated that none of the facilities had 100% stock of essential supplies and drugs. Only one out of all

  13. Integrated Power, Avionics, and Software (IPAS) Flexible Systems Integration

    Data.gov (United States)

    National Aeronautics and Space Administration — The Integrated Power, Avionics, and Software (IPAS) facility is a flexible, multi-mission hardware and software design environment. This project will develop a...

  14. New facility for testing LHC HTS power leads

    CERN Document Server

    Rabehl, Roger Jon; Fehér, S; Huang, Y; Orris, D; Pischalnikov, Y; Sylvester, C D; Tartaglia, M

    2005-01-01

    A new facility for testing HTS power leads at the Fermilab Magnet Test Facility has been designed and operated. The facility has successfully tested 19 pairs of HTS power leads, which are to be integrated into the Large Hadron Collider Interaction Region cryogenic feed boxes. This paper describes the design and operation of the cryogenics, process controls, data acquisition, and quench management systems. HTS power lead test results from the commissioning phase of the project are also presented.

  15. Integrating industry nuclear codes and standards into United States Department of Energy facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jacox, J.

    1995-02-01

    Recently the United States Department of Energy (DOE) has mandated facilities under their jurisdiction use various industry Codes and Standards developed for civilian power reactors that operate under U.S. Nuclear Regulatory Commission License. While this is a major step forward in putting all our nuclear facilities under common technical standards there are always problems associated with implementing such advances. This paper will discuss some of the advantages and problems experienced to date. These include the universal challenge of educating new users of any technical documents, repeating errors made by the NRC licensed facilities over the years and some unique problems specific to DOE facilities.

  16. Technical Integration of SMART Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, P. H.; Noh, P. C. (and others)

    2006-12-15

    Preliminary experimental tests were carried out using the thermal-hydraulic integral test facility, VISTA (Experimental Verification by Integral Simulation of Transients and Accidents), which has been constructed to simulate the SMART-P. The VISTA facility is an integral test facility including the primary and secondary systems as well as safety-related Passive Residual heat removal (PRHR) systems. The integrated SMART desalination plant consists of Multi Effect Distillation Process combined with Thermal-Vapor Compressor(MED-TVC) and coupled with the extracted steam from turbine through the steam transformer. Steam transformer produces the main pressure steam and supplies to the MED-TVC unit. MED-TVC was selected as a desalination process coupled with SMART, since the thermal vapor compression is very effective where the steam is available at high temperature and pressure conditions than required in the evaporator. The standard design of the SMART desalination plant is under development as a part of the SMART project. This report describes design concept of these systems and their requirements.

  17. Facility effluent monitoring plan for the uranium trioxide facility

    International Nuclear Information System (INIS)

    Thompson, R.J.; Sontag, S.

    1991-11-01

    A facility effluent monitoring plant is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The UO 3 Plant is located in the south-central portion of the 200 West Area of the Hanford Site. The plant consists of two primary processing buildings and several ancillary facilities. The purpose of the UO 3 Plant is to receive uranyl nitrate hexahydrate (UNH) from the Plutonium-Uranium Extraction (PUREX) Plant, concentrate it, convert the UNH to uranium trioxide (UO 3 ) powder by calcination and package it for offsite shipment. The UO 3 Plant has been placed in a standby mode. There are two liquid discharges, and three gaseous exhaust stacks, and seven building exhausters that are active during standby conditions

  18. Status of the pit disassembly and conversion facility

    International Nuclear Information System (INIS)

    Wood, Warren T.; Christensen, Lowell T.

    2000-01-01

    A planned new facility, the Pit Disassembly and Conversion Facility (PDCF), will be used to disassemble the nation's inventory of surplus nuclear weapons pits and convert the plutonium from those pits into a form suitable for storage, international inspection, and final disposition. Sized to handle 35 metric tons of plutonium from pits and other sources over its 10-year operating life, the PDCF will apply the Advanced Recovery and Integrated Extraction System (ARIES) technology. ARIES process technology has been developed at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL), and an integrated system is being demonstrated at LANL. The Los Alamos National Laboratory is the lead for technical design oversight of the PDCF. Technical data gained from the ARIES demonstrations is integral for the proper design of the PDCF

  19. Facility Management in Social Housing: integration of Services for Management of College Student Housing as an opportunity for Supply Development in Italy

    OpenAIRE

    Ernesto Casara; Alberto Fecchio

    2012-01-01

    College Student Residences are construction works for which the State emphasizes the social relevance and disposes facilities for private investors and public operators. Structured transactions by Property Funds are growing since 2007 in order to develop Student Housing. These activities have been changing the Italian Offer Scenery. The proposed model focuses on highquality residential offer and it integrates residence with supports and services in the Student Housing itself. The Provider is ...

  20. Power Systems Development Facility. Quarterly report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a fimction of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and hot gas cleanup units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDS) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter. Delivery and construction of the process structural steel is nearing completion. Nearly all equipment are set in its place and the FW equipment and the PCDs are being set in the structure.

  1. Toroid magnet test facility

    CERN Multimedia

    2002-01-01

    Because of its exceptional size, it was not feasible to assemble and test the Barrel Toroid - made of eight coils - as an integrated toroid on the surface, prior to its final installation underground in LHC interaction point 1. It was therefore decided to test these eight coils individually in a dedicated test facility.

  2. 1999 status of the Aube facility

    International Nuclear Information System (INIS)

    2000-01-01

    This document presents a status of the life of the Aube radioactive waste facility under its different aspects: technical, economical, social and ecological (exploitation indicators, origin of the personnel, local integration etc..). (J.S.)

  3. Remote handling technology for nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Sakai, Akira; Maekawa, Hiromichi; Ohmura, Yutaka

    1997-01-01

    Design and R and D on nuclear fuel cycle facilities has intended development of remote handling and maintenance technology since 1977. IHI has completed the design and construction of several facilities with remote handling systems for Power Reactor and Nuclear Fuel Development Corporation (PNC), Japan Atomic Energy Research Institute (JAERI), and Japan Nuclear Fuel Ltd. (JNFL). Based on the above experiences, IHI is now undertaking integration of specific technology and remote handling technology for application to new fields such as fusion reactor facilities, decommissioning of nuclear reactors, accelerator testing facilities, and robot simulator-aided remote operation systems in the future. (author)

  4. Emergence of Integrated Urology-Radiation Oncology Practices in the State of Texas

    International Nuclear Information System (INIS)

    Jhaveri, Pavan M.; Sun Zhuyi; Ballas, Leslie; Followill, David S.; Hoffman, Karen E.; Jiang Jing; Smith, Benjamin D.

    2012-01-01

    Purpose: Integrated urology-radiation oncology (RO) practices have been advocated as a means to improve community-based prostate cancer care by joining urologic and radiation care in a single-practice environment. However, little is known regarding the scope and actual physical integration of such practices. We sought to characterize the emergence of such practices in Texas, their extent of physical integration, and their potential effect on patient travel times for radiation therapy. Methods and Materials: A telephone survey identified integrated urology-RO practices, defined as practices owned by urologists that offer RO services. Geographic information software was used to determine the proximity of integrated urology-RO clinic sites with respect to the state's population. We calculated patient travel time and distance from each integrated urology-RO clinic offering urologic services to the RO treatment facility owned by the integrated practice and to the nearest nonintegrated (independent) RO facility. We compared these times and distances using the Wilcoxon-Mann-Whitney test. Results: Of 229 urology practices identified, 12 (5%) offered integrated RO services, and 182 (28%) of 640 Texas urologists worked in such practices. Approximately 53% of the state population resides within 10 miles of an integrated urology-RO clinic site. Patients with a diagnosis of prostate cancer at an integrated urology-RO clinic site travel a mean of 19.7 miles (26.1 min) from the clinic to reach the RO facility owned by the integrated urology-RO practice vs 5.9 miles (9.2 min) to reach the nearest nonintegrated RO facility (P<.001). Conclusions: Integrated urology-RO practices are common in Texas and are generally clustered in urban areas. In most integrated practices, the urology clinics and the integrated RO facilities are not at the same location, and driving times and distances from the clinic to the integrated RO facility exceed those from the clinic to the nearest

  5. Multiloop integral system test (MIST)

    International Nuclear Information System (INIS)

    Gloudemans, J.R.

    1989-07-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock and Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The individual tests are described in detail in Volumes 2 through 8 and Volume 11, and are summarized in Volume 1. Inter-group comparisons are addressed in this document, Volume 9. These comparisons are grouped as follows: mapping versus SBLOCA transients, SBLOCA, pump effects, and the effects of noncondensible gases. Appendix A provides an index and description of the microfiched plots for each test, which are enclosed with the corresponding Volumes 2 through 8. 147 figs., 5 tabs

  6. Enforcement and Compliance History Online (ECHO) Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — ECHO provides integrated compliance and enforcement information for about 800,000 regulated facilities nationwide. Its features range from simple to advanced,...

  7. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1994-01-01

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup

  8. Design of spent fuel storage facilities

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide is for interim spent fuel storage facilities that are not integral part of an operating nuclear power plant. Following the introduction, Section 2 describes the general safety requirements applicable to the design of both wet and dry spent fuel storage facilities; Section 3 deals with the design requirements specific to either wet or dry storage. Recommendations for the auxiliary systems of any storage facility are contained in Section 4; these are necessary to ensure the safety of the system and its safe operation. Section 5 provides recommendations for establishing the quality assurance system for a storage facility. Section 6 discusses the requirements for inspection and maintenance that must be considered during the design. Finally, Section 7 provides guidance on design features to be considered to facilitate eventual decommissioning. 18 refs

  9. MONITOR: A computer model for estimating the costs of an integral monitored retrievable storage facility

    International Nuclear Information System (INIS)

    Reimus, P.W.; Sevigny, N.L.; Schutz, M.E.; Heller, R.A.

    1986-12-01

    The MONITOR model is a FORTRAN 77 based computer code that provides parametric life-cycle cost estimates for a monitored retrievable storage (MRS) facility. MONITOR is very flexible in that it can estimate the costs of an MRS facility operating under almost any conceivable nuclear waste logistics scenario. The model can also accommodate input data of varying degrees of complexity and detail (ranging from very simple to more complex) which makes it ideal for use in the MRS program, where new designs and new cost data are frequently offered for consideration. MONITOR can be run as an independent program, or it can be interfaced with the Waste System Transportation and Economic Simulation (WASTES) model, a program that simulates the movement of waste through a complete nuclear waste disposal system. The WASTES model drives the MONITOR model by providing it with the annual quantities of waste that are received, stored, and shipped at the MRS facility. Three runs of MONITOR are documented in this report. Two of the runs are for Version 1 of the MONITOR code. A simulation which uses the costs developed by the Ralph M. Parsons Company in the 2A (backup) version of the MRS cost estimate. In one of these runs MONITOR was run as an independent model, and in the other run MONITOR was run using an input file generated by the WASTES model. The two runs correspond to identical cases, and the fact that they gave identical results verified that the code performed the same calculations in both modes of operation. The third run was made for Version 2 of the MONITOR code. A simulation which uses the costs developed by the Ralph M. Parsons Company in the 2B (integral) version of the MRS cost estimate. This run was made with MONITOR being run as an independent model. The results of several cases have been verified by hand calculations

  10. Vitrification facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project's vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project's background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing

  11. Modern integrated environmental monitoring and processing systems for nuclear facilities

    International Nuclear Information System (INIS)

    Oprea, I.

    2000-01-01

    presentation by using on-line dynamic evolution of the events, environment information, evacuation optimization, image and voice processing. These modern systems are proposed for environmental monitoring around nuclear facilities, as open interactive systems supporting the operator in the global overview of the environment and the status of the situation updating the remote GIS data base, assuring man-computer interaction and a good information flow for emergency knowledge exchange, improving the protection of the population and decision makers efforts. The local monitoring systems could be integrated into national or international environmental monitoring systems, achieving desired interoperability between government, civilian and army in disaster preparedness efforts

  12. Investigation on integrity of JMTR concrete structures, cooling system and utility facilities

    International Nuclear Information System (INIS)

    Ebisawa, Hiroyuki; Tobita, Kenji; Fukasaku, Akitomi; Kaminaga, Masanori

    2010-02-01

    The condition of facilities and components to be used for re-operation of the Japan Materials Testing Reactor (JMTR) from FY2011, was investigated before the refurbishment work. An investigation of aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, trench, canal, filter banks and for aged components of tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out from the beginning of FY2007. As a result, cracks of concrete structures such as the exhaust stack, a foundation of the UCL (Utility Cooling Line) elevated water tank were repaired and pipe linings of secondary cooling system were replaced. Motors of primary cooling pumps, pumps in the secondary cooling system and in other systems were decided to replace from viewpoints of future maintenance and improvement of reliability. Other components and the reactor building were decided to use continuously for a long-term by appropriate maintenance activities based on the long-term maintenance plan. In this paper, the aged-investigation for the JMTR reactor building, heat exchangers and emergency generators is presented. (author)

  13. Opportunities for Integrated Fast Ignition program

    International Nuclear Information System (INIS)

    Mackinnon, A. J.; Key, M. H.; Hatchett, S. P.; Tabak, M.; Town, R.; Gregori, G.; Patel, P. K.; Snavely, R.; Freeman, R. R.; Stephens, R. B.; Beg, F.

    2005-01-01

    Experiments designed to investigate the physics of particle transport and heating of dense plasmas have been carried out in an number of facilities around the world since the publication of the fast ignition concept in 1997. To date a number of integrated experiments, examining the capsule implosion and subsequent heating have been carried out on the Gekko facility at the Institute of Laser Engineering (ILE) Osaka, Japan. The coupling of energy by the short pulse into the pre-compressed core in these experiments was very encouraging. More facilities capable of carrying out integrated experiments are currently under construction: Firex at ILEm the Omega EP facility at the University of Rochester, Z PW at Sandia National Lab, LIL in France and eventually high energy PW beams on the NIF. This presentation will review the current status of experiments in this area and discuss the capabilities of integrated fast ignition research that will be required to design the proof of principle and scaling experiments for fast ignition to be carried on the NIF. (Author)

  14. PIMS sequencing extension: a laboratory information management system for DNA sequencing facilities

    Directory of Open Access Journals (Sweden)

    Baldwin Stephen A

    2011-03-01

    Full Text Available Abstract Background Facilities that provide a service for DNA sequencing typically support large numbers of users and experiment types. The cost of services is often reduced by the use of liquid handling robots but the efficiency of such facilities is hampered because the software for such robots does not usually integrate well with the systems that run the sequencing machines. Accordingly, there is a need for software systems capable of integrating different robotic systems and managing sample information for DNA sequencing services. In this paper, we describe an extension to the Protein Information Management System (PIMS that is designed for DNA sequencing facilities. The new version of PIMS has a user-friendly web interface and integrates all aspects of the sequencing process, including sample submission, handling and tracking, together with capture and management of the data. Results The PIMS sequencing extension has been in production since July 2009 at the University of Leeds DNA Sequencing Facility. It has completely replaced manual data handling and simplified the tasks of data management and user communication. Samples from 45 groups have been processed with an average throughput of 10000 samples per month. The current version of the PIMS sequencing extension works with Applied Biosystems 3130XL 96-well plate sequencer and MWG 4204 or Aviso Theonyx liquid handling robots, but is readily adaptable for use with other combinations of robots. Conclusions PIMS has been extended to provide a user-friendly and integrated data management solution for DNA sequencing facilities that is accessed through a normal web browser and allows simultaneous access by multiple users as well as facility managers. The system integrates sequencing and liquid handling robots, manages the data flow, and provides remote access to the sequencing results. The software is freely available, for academic users, from http://www.pims-lims.org/.

  15. PIMS sequencing extension: a laboratory information management system for DNA sequencing facilities.

    Science.gov (United States)

    Troshin, Peter V; Postis, Vincent Lg; Ashworth, Denise; Baldwin, Stephen A; McPherson, Michael J; Barton, Geoffrey J

    2011-03-07

    Facilities that provide a service for DNA sequencing typically support large numbers of users and experiment types. The cost of services is often reduced by the use of liquid handling robots but the efficiency of such facilities is hampered because the software for such robots does not usually integrate well with the systems that run the sequencing machines. Accordingly, there is a need for software systems capable of integrating different robotic systems and managing sample information for DNA sequencing services. In this paper, we describe an extension to the Protein Information Management System (PIMS) that is designed for DNA sequencing facilities. The new version of PIMS has a user-friendly web interface and integrates all aspects of the sequencing process, including sample submission, handling and tracking, together with capture and management of the data. The PIMS sequencing extension has been in production since July 2009 at the University of Leeds DNA Sequencing Facility. It has completely replaced manual data handling and simplified the tasks of data management and user communication. Samples from 45 groups have been processed with an average throughput of 10000 samples per month. The current version of the PIMS sequencing extension works with Applied Biosystems 3130XL 96-well plate sequencer and MWG 4204 or Aviso Theonyx liquid handling robots, but is readily adaptable for use with other combinations of robots. PIMS has been extended to provide a user-friendly and integrated data management solution for DNA sequencing facilities that is accessed through a normal web browser and allows simultaneous access by multiple users as well as facility managers. The system integrates sequencing and liquid handling robots, manages the data flow, and provides remote access to the sequencing results. The software is freely available, for academic users, from http://www.pims-lims.org/.

  16. Radiation monitoring in a synchrotron light source facility using magnetically levitated electrode ionization chambers

    International Nuclear Information System (INIS)

    Ichiki, Hirofumi; Kawaguchi, Toshirou; Utsunomiya, Yoshitomo; Ishibashi, Kenji; Ikeda, Nobuo; Korenaga, Kazuhito

    2009-01-01

    We developed a highly accurate differential-type automatic radiation dosimeter to measure very low radiation doses. The dosimeter had two ionization chambers, each of which had a magnetically levitated electrode and it was operated in a repetitive-time integration mode. We first installed the differential-type automatic radiation dosimeter with MALICs at a high-energy electron accelerator facility (Kyushu Synchrotron Light Research Center Facility) and measured the background and ionizing radiations in the facility as well as the gaseous radiation in air. In the background dose measurements, the accuracy of the repetitive-time integration-type dosimeter was three times better than that of a commercial ionization chamber. When the radiation dose increased momentarily at the electron injection from the linac to the operating storage ring, the dosimeter with repetitive-time integral mode gave a successful response to the actual dose variation. The gaseous radiation dose in the facility was at the same level as that in Fukuoka City. We confirmed that the dosimeter with magnetically levitated electrode ionization chambers was usable in the accelerator facility, in spite of its limited response when operated in the repetitive-time integration mode. (author)

  17. Advanced facilities for radiochemistry at Harwell

    International Nuclear Information System (INIS)

    1985-01-01

    The leaflets in this folder describe the latest addition to Harwell's active handling capability. This is a high level alpha, beta, gamma facility designed specifically for undertaking chemical research and development work. It is based on using high integrity containment boxes which are housed in concrete shielded enclosures. The active boxes can be removed and transferred remotely to a support area where they, and any associated equipment, can be decontaminated and serviced whilst a new fully commissioned box can be readily brought into service. The facility fulfills the principle of ALARA and is sufficiently flexible to accommodate a wide range of active handling requirements. It is supported by a suite of medium active handling cells, radiochemical laboratories and, as necessary, facilities of other scientific and engineering disciplines. The leaflets are: report on conceptual aspects; Techsheet 'Remote handling facility - Salient information'; Techsheet 'Project capabilities'; and 4 sheets of diagrams showing details of the facility. (U.K.)

  18. Improving Energy Efficiency In Thermal Oil Recovery Surface Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Murthy Nadella, Narayana

    2010-09-15

    Thermal oil recovery methods such as Cyclic Steam Stimulation (CSS), Steam Assisted Gravity Drainage (SAGD) and In-situ Combustion are being used for recovering heavy oil and bitumen. These processes expend energy to recover oil. The process design of the surface facilities requires optimization to improve the efficiency of oil recovery by minimizing the energy consumption per barrel of oil produced. Optimization involves minimizing external energy use by heat integration. This paper discusses the unit processes and design methodology considering thermodynamic energy requirements and heat integration methods to improve energy efficiency in the surface facilities. A design case study is presented.

  19. Optically-based Sensor System for Critical Nuclear Facilities Post-Event Seismic Structural Assessment

    Energy Technology Data Exchange (ETDEWEB)

    McCallen, David [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Petrone, Floriana [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Buckle, Ian [Univ. of Nevada, Reno, NV (United States); Wu, Suiwen [Univ. of Nevada, Reno, NV (United States); Coates, Jason [California State Univ., Chico, CA (United States)

    2017-09-30

    The U.S. Department of Energy (DOE) has ownership and operational responsibility for a large enterprise of nuclear facilities that provide essential functions to DOE missions ranging from national security to discovery science and energy research. These facilities support a number of DOE programs and offices including the National Nuclear Security Administration, Office of Science, and Office of Environmental Management. With many unique and “one of a kind” functions, these facilities represent a tremendous national investment, and assuring their safety and integrity is fundamental to the success of a breadth of DOE programs. Many DOE critical facilities are located in regions with significant natural phenomenon hazards including major earthquakes and DOE has been a leader in developing standards for the seismic analysis of nuclear facilities. Attaining and sustaining excellence in nuclear facility design and management must be a core competency of the DOE. An important part of nuclear facility management is the ability to monitor facilities and rapidly assess the response and integrity of the facilities after any major upset event. Experience in the western U.S. has shown that understanding facility integrity after a major earthquake is a significant challenge which, lacking key data, can require extensive effort and significant time. In the work described in the attached report, a transformational approach to earthquake monitoring of facilities is described and demonstrated. An entirely new type of optically-based sensor that can directly and accurately measure the earthquake-induced deformations of a critical facility has been developed and tested. This report summarizes large-scale shake table testing of the sensor concept on a representative steel frame building structure, and provides quantitative data on the accuracy of the sensor measurements.

  20. Facilities evaluation report

    International Nuclear Information System (INIS)

    Sloan, P.A.; Edinborough, C.R.

    1992-04-01

    The Buried Waste Integrated Demonstration (BWID) is a program of the Department of Energy (DOE) Office of Technology Development whose mission is to evaluate different new and existing technologies and determine how well they address DOE community waste remediation problems. Twenty-three Technical Task Plans (TTPs) have been identified to support this mission during FY-92; 10 of these have identified some support requirements when demonstrations take place. Section 1 of this report describes the tasks supported by BWID, determines if a technical demonstration is proposed, and if so, identifies the support requirements requested by the TTP Principal Investigators. Section 2 of this report is an evaluation identifying facility characteristics of existing Idaho National Engineering Laboratory (INEL) facilities that may be considered for use in BWID technology demonstration activities

  1. Sociological perspective on the siting of hazardous waste facilities

    International Nuclear Information System (INIS)

    Mileti, D.S.; Williams, R.G.

    1985-01-01

    The siting of hazardous waste facilities has been, and will likely continue to be, both an important societal need and a publically controversial topic. Sites have been denounced, shamed, banned, and moved at the same time that the national need for their installation and use has grown. Despite available technologies and physical science capabilities, the effective siting of facilitites stands more as a major contemporary social issue than it is a technological problem. Traditional social impact assessment approaches to the siting process have largely failed to meaningfully contribute to successful project implementation; these efforts have largely ignored the public perception aspects of risk and hazard on the success or failure of facility siting. This paper proposes that the siting of hazardous waste facilities could well take advantage of two rich but somewhat disparate research histories in the social sciences. A convergent and integrated approach would result from the successful blending of social impact assessment, which seeks to define and mitigate problems, with an approach used in hazards policy studies, which has sought to understand and incorporate public risk perceptions into effective public decision-making. It is proposed in this paper that the integration of these two approaches is necessary for arriving at more readily acceptable solutions to siting hazardous waste facilities. This paper illustrates how this integration of approaches could be implemented

  2. Monitoring System with Two Central Facilities Protocol

    Directory of Open Access Journals (Sweden)

    Caesar Firdaus

    2017-03-01

    Full Text Available The security of data and information on government’s information system required proper way of defending against threat. Security aspect can be achieved by using cryptography algorithm, applying information hiding concept, and implementing security protocol. In this research, two central facilities protocol was implemented on Research and Development Center of Mineral and Coal Technology’s Cooperation Contract Monitoring System by utilizing AES and whitespace manipulation algorithm. Adjustment on the protocol by creating several rule of validation ID’s generation and checking processes could fulfill two of four cryptography objectives, consist of authentication and non-repudiation. The solid collaboration between central legitimization agency (CLA, central tabulating facility (CTF, and client is the main idea in two central facilities protocol. The utilization of AES algorithm could defend the data on transmission from man in the middle attack scenario. On the other hand, whitespace manipulation algorithm provided data integrity aspect of the document that is uploaded to the system itself. Both of the algorithm fulfill confidentiality, data integrity, and authentication.

  3. Integration of TB and ART services fails to improve TB treatment ...

    African Journals Online (AJOL)

    The median CD4+ count of HIV-positive patients was 152 cells/μl (interquartile range (IQR) 71 - 277) for integrated facilities and 148 cells/μl (IQR 67 - 260) for single-service facilities. There was no statistical difference in the TB treatment outcome profile between integrated and single-service facilities for all TB patients (p=0.

  4. Preliminary conceptual study of engineering-scale pyroprocess demonstration facility

    International Nuclear Information System (INIS)

    Moon, Seong-In; Chong, Won-Myung; You, Gil-Sung; Ku, Jeong-Hoe; Kim, Ho-Dong

    2013-01-01

    Highlights: ► The conceptual design of a pyroprocess demonstration facility was performed. ► The design requirements for the pyroprocess hot cell and equipment were determined. ► The maintenance concept for the pyroprocess hot cell was presented. -- Abstract: The development of an effective management technology of spent fuel is important to enhance environmental friendliness, cost viability and proliferation resistance. In Korea, pyroprocess technology has been considered as a fuel cycle option to solve the spent fuel accumulation problems. PRIDE (PyRoprocess Integrated inactive DEmonstration facility) has been developed from 2007 to 2012 in Korea as a cold test facility to support integrated pyroprocessing and an equipment demonstration, which is essential to verify the pyroprocess technology. As the next stage of PRIDE, the design requirements of an engineering-scale demonstration facility are being developed, and the preliminary conceptual design of the facility is being performed for the future. In this paper, the main design requirements for the engineering-scale pyroprocess demonstration facility were studied in the throughput of 10tHM a year. For the preliminary conceptual design of the facility, the design basis of the pyroprocess hot cell was suggested, and the main equipment, main process area, operation area, maintenance area, and so on were arranged in consideration of the effective operation of the hot cells. Also, the argon system was designed to provide and maintain a proper inert environment for the pyroprocess. The preliminary conceptual design data will be used to review the validity of the engineering-scale pyroprocess demonstration facility that enhances both safety and nonproliferation

  5. Radiological dose assessment from the operation of Daeduk nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Won Tae; Kim, Eun Han; Suh, Kyung Suk; Choi, Young Gil [Korea Atomic Energy Research Institute, Taejon (Korea)

    2000-02-01

    The objective of this project is to assure the public acceptance for nuclear facilities, and the environmental safety from the operation of Daeduk nuclear facilities, such as HANARO research reactor, nuclear fuel processing facilities and others. For identifying the integrity of their facilities, the maximum individual doses at the site boundary and on the areas with high population density were assessed. Also, the collective doses within radius 80 km from the site were assessed. The radiation impacts for residents around the site from the operation of Daeduk nuclear facilities in 1999 were neglectable. 8 refs., 10 figs., 27 tabs. (Author)

  6. Sociological perspective on the siting of hazardous waste facilities

    International Nuclear Information System (INIS)

    Mileti, D.S.

    1985-01-01

    The site of hazardous waste facilities has been, and will likely continue to be, both an important societal need and a publicity controversial topic. Sites have been denounced, shamed, banned, and moved at the same time that the national need for their installation and use has grown. Based on the available technologies, the effective siting of facilities is more of a major contemporary social issue than it is a technological problem. Traditional social impact assessment approaches to the siting process have generally failed to meaningfully contribute to successful project implementation; these efforts have largely ignored the public perception aspects of risk and hazard on the success or failure of facility siting. It is proposed in this paper that more readily acceptable solutions to siting hazardous waste facilities might result from the integration of two social science approaches: (1) social impact assessment, which seeks to define and mitigate problems, and (2) hazards policy studies, which has sought to understand and incorporate public risk perceptions into effective public decision-making. This paper illustrates how this integration of approaches could be implemented

  7. Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kirk, P.G.; Stephens, Jr.J.M.

    2009-01-01

    The Integrated Facility Disposition Project (IFDP) is a multi-billion-dollar remediation effort being conducted by the U.S. Department of Energy (DOE) Office of Environmental Management in Oak Ridge, Tennessee. The scope of the IFDP encompasses remedial actions related to activities conducted over the past 65 years at the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12). Environmental media and facilities became contaminated as a result of operations, leaks, spills, and past waste disposal practices. ORNL's mission includes energy, environmental, nuclear security, computational, and materials research and development. Remediation activities will be implemented at ORNL as part of IFDP scope to meet remedial action objectives established in existing and future decision documents. Remedial actions are necessary (1) to comply with environmental regulations to reduce human health and environmental risk and (2) to release strategic real estate needed for modernization initiatives at ORNL. The scope of remedial actions includes characterization, waste management, transportation and disposal, stream restoration, and final remediation of contaminated soils, sediments, and groundwater. Activities include removal of at or below-grade substructures such as slabs, underground utilities, underground piping, tanks, basins, pits, ducts, equipment housings, manholes, and concrete-poured structures associated with equipment housings and basement walls/floors/columns. Many interim remedial actions involving groundwater and surface water that have not been completed are included in the IFDP remedial action scope. The challenges presented by the remediation of Bethel Valley at ORNL are formidable. The proposed approach to remediation endeavors to use the best available technologies and technical approaches from EPA and other federal agencies and lessons learned from previous cleanup efforts. The objective is to minimize cost, maximize remedial

  8. SIGMA Experimental Facility

    International Nuclear Information System (INIS)

    Rivarola, Martin; Florido, Pablo; Gonzalez, Jose; Brasnarof, Daniel; Orellano, Pablo; Bergallo, Juan

    2000-01-01

    The SIGMA ( Separacion Isotopica Gaseosa por Metodos Avanzados) concept is outlined.The old gaseous diffusion process to enrich uranium has been updated to be economically competitive for small production volumes.Major innovations have been introduced in the membrane design and in the integrated design of compressors and diffusers.The use of injectors and gas turbines has been also adopted.The paper describes the demonstration facility installed by the Argentine Atomic Energy Commission

  9. The application of integrated safety management principles to the Tritium Extraction Facility project

    International Nuclear Information System (INIS)

    Hickman, M.O.; Viviano, R.R.

    2000-01-01

    The DOE has developed a program that is accomplishing a heightened safety posture across the complex. The Integrated Safety Management (ISM) System (ISMS) program utilizes five core functions and seven guiding principles as the basis for implementation. The core functions define the work scope, analyze the hazards, develop and implement hazard controls, perform the work, and provide feedback for improvement. The guiding principles include line management responsibility, clear roles and responsibilities, competence per responsibilities, identification of safety standards/requirements, tailored hazard control, balanced priorities, and operations authorization. There exists an unspecified eighth principle, that is, worker involvement. A program requiring the direct involvement of the employees who are actually performing the work has been shown to be quite an effective method of communicating safety requirements, controlling work in a safe manner, and reducing safety violations and injuries. The Tritium Extraction Facility (TEF) projects, a component of the DOE's Commercial Light Water Reactor Tritium Production program, has taken the ISM principles and core functions and applied them to the project's design. The task of the design team is to design a facility and systems that will meet the production requirements of the DOE tritium mission as well as a design that minimizes the workers' exposure to adverse safety situations and hazards/hazardous materials. During the development of the preliminary design for the TEF, design teams consisted of not only designers but also personnel who had operational experience in the existing tritium and personnel who had operational experience in the existing tritium and personnel who had specialized experience from across the DOE complex. This design team reviewed multiple documents associated with the TEF operation in order to identify and document the hazards associated with the tritium process. These documents include hazards

  10. Sapphire Energy - Integrated Algal Biorefinery

    Energy Technology Data Exchange (ETDEWEB)

    White, Rebecca L. [Sapphire Energy, Inc., Columbus, NM (United States). Columbus Algal Biomass Farm; Tyler, Mike [Sapphire Energy, Inc., San Diego, CA (United States)

    2015-07-22

    Sapphire Energy, Inc. (SEI) is a leader in large-scale photosynthetic algal biomass production, with a strongly cohesive research, development, and operations program. SEI takes a multidiscipline approach to integrate lab-based strain selection, cultivation and harvest and production scale, and extraction for the production of Green Crude oil, a drop in replacement for traditional crude oil.. SEI’s technical accomplishments since 2007 have produced a multifunctional platform that can address needs for fuel, feed, and other higher value products. Figure 1 outlines SEI’s commercialization process, including Green Crude production and refinement to drop in fuel replacements. The large scale algal biomass production facility, the SEI Integrated Algal Biorefinery (IABR), was built in Luna County near Columbus, New Mexico (see fig 2). The extraction unit was located at the existing SEI facility in Las Cruces, New Mexico, approximately 95 miles from the IABR. The IABR facility was constructed on time and on budget, and the extraction unit expansion to accommodate the biomass output from the IABR was completed in October 2012. The IABR facility uses open pond cultivation with a proprietary harvesting method to produce algal biomass; this biomass is then shipped to the extraction facility for conversion to Green Crude. The operation of the IABR and the extraction facilities has demonstrated the critical integration of traditional agricultural techniques with algae cultivation knowledge for algal biomass production, and the successful conversion of the biomass to Green Crude. All primary unit operations are de-risked, and at a scale suitable for process demonstration. The results are stable, reliable, and long-term cultivation of strains for year round algal biomass production. From June 2012 to November 2014, the IABR and extraction facilities produced 524 metric tons (MT) of biomass (on a dry weight basis), and 2,587 gallons of Green Crude. Additionally, the IABR

  11. Savannah River Site RCRA/CERCLA/NEPA integrated investigation case study

    International Nuclear Information System (INIS)

    Clark, D.R.; Thomas, R.; Wilson, M.P.

    1992-01-01

    The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National Priority List in 1989. Numerous past disposal facilities and contaminated areas are undergoing the integrated regulatory remediation process detailed in the draft SRS Federal Facility Agreement. This paper will discuss the integration of these requirements by highlighting the investigation of the D-Area Burning/Rubble Pits, a typical waste unit at SRS

  12. Instrumentation and measurement method for the ATLAS test facility

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Byong Jo; Chu, In Chul; Eu, Dong Jin; Kang, Kyong Ho; Kim, Yeon Sik; Song, Chul Hwa; Baek, Won Pil

    2007-03-15

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS is constructed by thermal-hydraulic safety research division in KAERI. The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400 which is a Korean evolution type nuclear reactors. A total 1300 instrumentations is equipped in the ATLAS test facility. In this report, the instrumentation of ATLAS test facility and related measurement methods were introduced.

  13. Energy Systems Integration: Demonstrating Distributed Resource Communications

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    Overview fact sheet about the Electric Power Research Institute (EPRI) and Schneider Electric Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  14. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  15. Implementation of remove monitoring in facilities under safeguards with unattended systems

    International Nuclear Information System (INIS)

    Beddingfield, David H.; Nordquist, Heather A.; Umebayaashi, Eiji

    2009-01-01

    Remote monitoring is being applied by the International Atomic Energy Agency (IAEA) at nuclear facilities around the world. At the Monju Reactor in Japan we have designed, developed and implemented a remote monitoring approach that can serve as a model for applying remote monitoring to facilities that are already under full-scope safeguards using unattended instrumentation. Remote monitoring implementations have historically relied upon the use of specialized data collection hardware and system design features that integrate remote monitoring into the safeguards data collection system. The integration of remote monitoring and unattended data collection increases the complexity of safeguards data collection systems. This increase in complexity necessarily produces a corresponding reduction of system reliability compared to less-complex unattended monitoring systems. At the Monju facility we have implemented a remote monitoring system that is decoupled from the activity of safeguards data collection. In the completed system the function of remote data transfer is separated from the function of safeguards data collection. As such, a failure of the remote monitoring function cannot produce an associated loss of safeguards data, as is possible with integrated remote-monitoring implementations. Currently, all safeguards data from this facility is available to the IAEA on a 24/7 basis. This facility employs five radiation-based unattended systems, video surveillance and numerous optical seal systems. The implementation of remote monitoring at this facility, while increasing the complexity of the safeguards system, is designed to avoid any corresponding reduction in reliability of the safeguards data collection systems by having decoupled these functions. This design and implementation can serve as a model for implementation of remote monitoring at nuclear facilities that currently employ unattended safeguards systems.

  16. A Bioinformatics Facility for NASA

    Science.gov (United States)

    Schweighofer, Karl; Pohorille, Andrew

    2006-01-01

    Building on an existing prototype, we have fielded a facility with bioinformatics technologies that will help NASA meet its unique requirements for biological research. This facility consists of a cluster of computers capable of performing computationally intensive tasks, software tools, databases and knowledge management systems. Novel computational technologies for analyzing and integrating new biological data and already existing knowledge have been developed. With continued development and support, the facility will fulfill strategic NASA s bioinformatics needs in astrobiology and space exploration. . As a demonstration of these capabilities, we will present a detailed analysis of how spaceflight factors impact gene expression in the liver and kidney for mice flown aboard shuttle flight STS-108. We have found that many genes involved in signal transduction, cell cycle, and development respond to changes in microgravity, but that most metabolic pathways appear unchanged.

  17. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2013-01-01

    Full Text Available Facility maintenance management (FMM has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  18. Space shuttle operations integration plan

    Science.gov (United States)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  19. Integrated five station nondestructive assay system for the support of decontamination and decommissioning of a former plutonium mixed oxide fuel fabrication facility

    International Nuclear Information System (INIS)

    Caldwell, J.T.; Bieri, J.M.; Hastings, R.D.; Horton, W.S.; Kuckertz, T.H.; Kunz, W.E.; Plettenberg, K.; Smith, L.D.

    1990-01-01

    The goal of a safe, efficient and economic decontamination and decommissioning of plutonium facilities can be greatly enhanced through the intelligent use of an integrated system of nondestructive assay equipment. We have designed and fabricated such a system utilizing five separate NDA stations integrated through a single data acquisition and management personal computer-based controller. The initial station utilizes a passive neutron measurement to determine item Pu inventory to the 0.1 gm level prior to insertion into the decontamination cell. A large active neutron station integrated into the cell is used to measure decontamination effectiveness at the 10 nci/gm level. Cell Pu buildup at critical points is monitored with passive neutron detectors. An active neutron station having better than 1 mg Pu assay sensitivity is used to quantify final compacted waste pucks outside the cell. Bulk Pu in various forms and isotopic enrichments is quantified in a combined passive neutron coincidence and high resolution gamma ray spectrometer station outside the cell. Item control and Pu inventory are managed with bar code labeling and a station integrating algorithm. Overall economy is achieved by multiple station use of the same expensive hardware such as the neutron generator

  20. EPA Facility Registry Service (FRS): Wastewater Treatment Plants

    Data.gov (United States)

    U.S. Environmental Protection Agency — This GIS dataset contains data on wastewater treatment plants, based on EPA's Facility Registry Service (FRS), EPA's Integrated Compliance Information System (ICIS)...

  1. Quality management in nuclear facilities decommissioning

    International Nuclear Information System (INIS)

    Garonis, Omar H.

    2002-01-01

    Internationally, the decommissioning organizations of nuclear facilities carry out the decommissioning according to the safety requirements established for the regulatory bodies. Some of them perform their activities in compliance with a quality assurance system. This work establishes standardization through a Specifications Requirement Document, for the management system of the nuclear facilities decommissioning organizations. It integrates with aspects of the quality, environmental, occupational safety and health management systems, and also makes these aspects compatible with all the requirements of the nuclear industry recommended for the International Atomic Energy Agency (IAEA). (author)

  2. Commercial-scale biotherapeutics manufacturing facility for plant-made pharmaceuticals.

    Science.gov (United States)

    Holtz, Barry R; Berquist, Brian R; Bennett, Lindsay D; Kommineni, Vally J M; Munigunti, Ranjith K; White, Earl L; Wilkerson, Don C; Wong, Kah-Yat I; Ly, Lan H; Marcel, Sylvain

    2015-10-01

    Rapid, large-scale manufacture of medical countermeasures can be uniquely met by the plant-made-pharmaceutical platform technology. As a participant in the Defense Advanced Research Projects Agency (DARPA) Blue Angel project, the Caliber Biotherapeutics facility was designed, constructed, commissioned and released a therapeutic target (H1N1 influenza subunit vaccine) in manufacturing facilities, with the capacity to process over 3500 kg of plant biomass per week in an automated multilevel growing environment using proprietary LED lighting. The facility can commission additional plant grow rooms that are already built to double this capacity. In addition to the commercial-scale manufacturing facility, a pilot production facility was designed based on the large-scale manufacturing specifications as a way to integrate product development and technology transfer. The primary research, development and manufacturing system employs vacuum-infiltrated Nicotiana benthamiana plants grown in a fully contained, hydroponic system for transient expression of recombinant proteins. This expression platform has been linked to a downstream process system, analytical characterization, and assessment of biological activity. This integrated approach has demonstrated rapid, high-quality production of therapeutic monoclonal antibody targets, including a panel of rituximab biosimilar/biobetter molecules and antiviral antibodies against influenza and dengue fever. © 2015 Society for Experimental Biology, Association of Applied Biologists and John Wiley & Sons Ltd.

  3. Professional Development through Organizational Assessment: Using APPA's Facilities Management Evaluation Program

    Science.gov (United States)

    Medlin, E. Lander; Judd, R. Holly

    2013-01-01

    APPA's Facilities Management Evaluation Program (FMEP) provides an integrated system to optimize organizational performance. The criteria for evaluation not only provide a tool for organizational continuous improvement, they serve as a compelling leadership development tool essential for today's facilities management professional. The senior…

  4. Mixed Waste Management Facility

    International Nuclear Information System (INIS)

    Brummond, W.; Celeste, J.; Steenhoven, J.

    1993-08-01

    The DOE has developed a National Mixed Waste Strategic Plan which calls for the construction of 2 to 9 mixed waste treatment centers in the Complex in the near future. LLNL is working to establish an integrated mixed waste technology development and demonstration system facility, the Mixed Waste Management Facility (MWMF), to support the DOE National Mixed Waste Strategic Plan. The MWMF will develop, demonstrate, test, and evaluate incinerator-alternatives which will comply with regulations governing the treatment and disposal of organic mixed wastes. LLNL will provide the DOE with engineering data for design and operation of new technologies which can be implemented in their mixed waste treatment centers. MWMF will operate under real production plant conditions and process samples of real LLNL mixed waste. In addition to the destruction of organic mixed wastes, the development and demonstration will include waste feed preparation, material transport systems, aqueous treatment, off-gas treatment, and final forms, thus making it an integrated ''cradle to grave'' demonstration. Technologies from offsite as well as LLNL's will be tested and evaluated when they are ready for a pilot scale demonstration, according to the needs of the DOE

  5. Operation of spent fuel storage facilities

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide was prepared as part of the IAEA's programme on safety of spent fuel storage. This is for interim spent fuel storage facilities that are not integral part of an operating nuclear power plant. Following the introduction, Section 2 describes key activities in the operation of spent fuel storage facilities. Section 3 lists the basic safety considerations for storage facility operation, the fundamental safety objectives being subcriticality, heat removal and radiation protection. Recommendations for organizing the management of a facility are contained in Section 4. Section 5 deals with aspects of training and qualification; Section 6 describes the phases of the commissioning of a spent fuel storage facility. Section 7 describes operational limits and conditions, while Section 8 deals with operating procedures and instructions. Section 9 deals with maintenance, testing, examination and inspection. Section 10 presents recommendations for radiation and environmental protection. Recommendations for the quality assurance (QA) system are presented in Section 11. Section 12 describes the aspects of safeguards and physical protection to be taken into account during operations; Section 13 gives guidance for decommissioning. 15 refs, 5 tabs

  6. Status of the National Ignition Facility Integrated Computer Control System (ICCS) on the Path to Ignition

    International Nuclear Information System (INIS)

    Lagin, L J; Bettenhauasen, R C; Bowers, G A; Carey, R W; Edwards, O D; Estes, C M; Demaret, R D; Ferguson, S W; Fisher, J M; Ho, J C; Ludwigsen, A P; Mathisen, D G; Marshall, C D; Matone, J M; McGuigan, D L; Sanchez, R J; Shelton, R T; Stout, E A; Tekle, E; Townsend, S L; Van Arsdall, P J; Wilson, E F

    2007-01-01

    The National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory is a stadium-sized facility under construction that will contain a 192-beam, 1.8-Megajoule, 500-Terawatt, ultraviolet laser system together with a 10-meter diameter target chamber with room for multiple experimental diagnostics. NIF is the world's largest and most energetic laser experimental system, providing a scientific center to study inertial confinement fusion (ICF) and matter at extreme energy densities and pressures. NIF's laser beams are designed to compress fusion targets to conditions required for thermonuclear burn, liberating more energy than required to initiate the fusion reactions. NIF is comprised of 24 independent bundles of 8 beams each using laser hardware that is modularized into more than 6,000 line replaceable units such as optical assemblies, laser amplifiers, and multifunction sensor packages containing 60,000 control and diagnostic points. NIF is operated by the large-scale Integrated Computer Control System (ICCS) in an architecture partitioned by bundle and distributed among over 800 front-end processors and 50 supervisory servers. NIF's automated control subsystems are built from a common object-oriented software framework based on CORBA distribution that deploys the software across the computer network and achieves interoperation between different languages and target architectures. A shot automation framework has been deployed during the past year to orchestrate and automate shots performed at the NIF using the ICCS. In December 2006, a full cluster of 48 beams of NIF was fired simultaneously, demonstrating that the independent bundle control system will scale to full scale of 192 beams. At present, 72 beams have been commissioned and have demonstrated 1.4-Megajoule capability of infrared light. During the next two years, the control system will be expanded to include automation of target area systems including final optics, target positioners and

  7. Status of the National Ignition Facility Integrated Computer Control System (ICCS) on the path to ignition

    International Nuclear Information System (INIS)

    Lagin, L.J.; Bettenhausen, R.C.; Bowers, G.A.; Carey, R.W.; Edwards, O.D.; Estes, C.M.; Demaret, R.D.; Ferguson, S.W.; Fisher, J.M.; Ho, J.C.; Ludwigsen, A.P.; Mathisen, D.G.; Marshall, C.D.; Matone, J.T.; McGuigan, D.L.; Sanchez, R.J.; Stout, E.A.; Tekle, E.A.; Townsend, S.L.; Van Arsdall, P.J.

    2008-01-01

    The National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory is a stadium-sized facility under construction that will contain a 192-beam, 1.8-MJ, 500-TW, ultraviolet laser system together with a 10-m diameter target chamber with room for multiple experimental diagnostics. NIF is the world's largest and most energetic laser experimental system, providing a scientific center to study inertial confinement fusion (ICF) and matter at extreme energy densities and pressures. NIF's laser beams are designed to compress fusion targets to conditions required for thermonuclear burn, liberating more energy than required to initiate the fusion reactions. NIF is comprised of 24 independent bundles of eight beams each using laser hardware that is modularized into more than 6000 line replaceable units such as optical assemblies, laser amplifiers, and multi-function sensor packages containing 60,000 control and diagnostic points. NIF is operated by the large-scale Integrated Computer Control System (ICCS) in an architecture partitioned by bundle and distributed among over 800 front-end processors and 50 supervisory servers. NIF's automated control subsystems are built from a common object-oriented software framework based on CORBA distribution that deploys the software across the computer network and achieves interoperation between different languages and target architectures. A shot automation framework has been deployed during the past year to orchestrate and automate shots performed at the NIF using the ICCS. In December 2006, a full cluster of 48 beams of NIF was fired simultaneously, demonstrating that the independent bundle control system will scale to full scale of 192 beams. At present, 72 beams have been commissioned and have demonstrated 1.4-MJ capability of infrared light. During the next 2 years, the control system will be expanded in preparation for project completion in 2009 to include automation of target area systems including final optics

  8. The mixed waste management facility

    International Nuclear Information System (INIS)

    Streit, R.D.

    1995-10-01

    During FY96, the Mixed Waste Management Facility (MWMF) Project has the following major objectives: (1) Complete Project Preliminary Design Review (PDR). (2) Complete final design (Title II) of MWMF major systems. (3) Coordinate all final interfaces with the Decontamination and Waste Treatment Facility (DWTF) for facility utilities and facility integration. (4) Begin long-lead procurements. (5) Issue Project Baseline Revision 2-Preliminary Design (PB2), modifying previous baselines per DOE-requested budget profiles and cost reduction. Delete Mediated Electrochemical Oxidation (MEO) as a treatment process for initial demonstration. (6) Complete submittal of, and ongoing support for, applications for air permit. (7) Begin detailed planning for start-up, activation, and operational interfaces with the Laboratory's Hazardous Waste Management Division (HWM). In achieving these objectives during FY96, the Project will incorporate and implement recent DOE directives to maximize the cost savings associated with the DWTF/MWMF integration (initiated in PB1.2); to reduce FY96 new Budget Authority to ∼$10M (reduced from FY97 Validation of $15.3M); and to keep Project fiscal year funding requirements largely uniform at ∼$10M/yr. A revised Project Baseline (i.e., PB2), to be issued during the second quarter of FY96, will address the implementation and impact of this guidance from an overall Project viewpoint. For FY96, the impact of this guidance is that completion of final design has been delayed relative to previous baselines (resulting from the delay in the completion of preliminary design); ramp-up in staffing has been essentially eliminated; and procurements have been balanced through the Project to help balance budget needs to funding availability

  9. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    Science.gov (United States)

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  10. Experiments on injection performance of SMART ECC facility using SWAT

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Young Il; Cho, Seok; Ko, Yung Joo; Min, Kyoung Ho; Shin, Yong Cheol; Kwon, Tae Soon; Yi, Sung Jae; Lee, Won Jae [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    SMART (System-integrated Modular Advanced ReacTor), an advanced integrated PWR is now in the under developing stages by KAERI. Such integral PWR excludes large-size piping of the primary system of conventional PWR and incorporates the SGs into RPV, which means no LBLOCA could occur in SMART. Therefore, the SBLOCA is considered as a major DBA (Design Basis Accident) in SMART and it is mainly analyzed by using TASS/SMR computer code. The TASS/SMR code should be validated using experimental data from both Integral Effect Test and Separate Effect Test facilities. To investigate injection performance of the ECC system, on SET facility, named as SWAT (SMART ECC Water Asymmetric Two-phase choking test facility), has been constructed at KAERI. The SWAT simulates the geometric configurations of the SG-side upper downcomer annulus and ECCSs of those of SMART. It is designed based on the modified linear scaling method with a scaling ratio of 1/5, to preserve the geometrical similarity and minimize gravitational distortion. The purpose of the SWAT tests is to investigate the safety injection performance, such as the ECC bypass in the downcomer and the penetration rate in the core during the SBLOCA, and hence to produce experimental data to validate and the prediction capability of safety analysis codes, TASS/SMR

  11. Energy Systems Integration: Demonstrating Distribution Feeder Voltage Control

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    Overview fact sheet about the Smarter Grid Solutions Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  12. The integral analysis of 40 mm diameter pipe rupture in cooling system of fusion facility W7-X with ASTEC code

    Energy Technology Data Exchange (ETDEWEB)

    Kačegavičius, Tomas, E-mail: Tomas.Kacegavicius@lei.lt; Povilaitis, Mantas, E-mail: Mantas.Povilaitis@lei.lt

    2015-12-15

    Highlights: • The analysis of loss-of-coolant accident (LOCA) in W7-X facility. • Burst disc is sufficient to prevent pressure inside the plasma vessel exceeding 110 kPa. • Developed model of the cooling system adequately represents the expected phenomena. - Abstract: Fusion is the energy production technology, which could potentially solve problems with growing energy demand of population in the future. Wendelstein 7-X (W7-X) is an experimental facility of stellarator type, which is currently being built at the Max-Planck-Institute for Plasmaphysics located in Greifswald, Germany. W7-X shall demonstrate that in future the energy could be produced in such type of fusion reactors. The safety analysis is required before the operation of the facility could be started. A rupture of 40 mm diameter pipe, which is connected to the divertor unit (module for plasma cooling) to ensure heat removal from the vacuum vessel in case of no-plasma operation mode “baking” is one of the design basis accidents to be investigated. During “baking” mode the vacuum vessel structures and working fluid – water are heated to the temperature 160 °C. This accident was selected for the detailed analysis using integral code ASTEC, which is developed by IRSN (France) and GRS mbH (Germany). This paper presents the integral analysis of W7-X response to a selected accident scenario. The model of the main cooling circuit and “baking” circuit was developed for ASTEC code. There were analysed two cases: (1) rupture of a pipe connected to the upper divertor unit and (2) rupture of a pipe connected to the lower divertor unit. The results of analysis showed that in both cases the water is almost completely released from the units into the plasma vessel. In both cases the pressure in the plasma vessel rapidly increases and in 28 s the set point for burst disc opening is reached preventing further pressurisation.

  13. Needs of Advanced Safeguards Technologies for Future Nuclear Fuel Cycle (FNFC) Facilities and a Trial Application of SBD Concept to Facility Design of a Hypothetical FNFC Facility

    International Nuclear Information System (INIS)

    Seya, M.; Hajima, R.; Nishimori, N.; Hayakawa, T.; Kikuzawa, N.; Shizuma, T.; Fujiwara, M.

    2010-01-01

    Some of future nuclear fuel cycle (FNFC) facilities are supposed to have the characteristic features of very large throughput of plutonium, low decontamination reprocessing (no purification process; existence of certain amount of fission products (FP) in all process material), full minor actinides (MA) recycle, and treatment of MOX with FP and MA in fuel fabrication. In addition, the following international safeguards requirements have to be taken into account for safeguards approaches of the FNFC facilities. -Application of integrated safeguards (IS) approach; -Remote (unattended) verification; - 'Safeguards by Design' (SBD) concept. These features and requirements compel us to develop advanced technologies, which are not emerged yet. In order to realize the SBD, facility designers have to know important parts of design information on advanced safeguards systems before starting the facility design. The SBD concept requires not only early start of R and D of advanced safeguards technologies (before starting preliminary design of the facility) but also interaction steps between researchers working on safeguards systems and nuclear facility designers. The interaction steps are follows. Step-1; researchers show images of advanced safeguards systems to facility designers based on their research. Step-2; facility designers take important design information on safeguards systems into process systems of demonstration (or test) facility. Step-3; demonstration and improvement of both systems based on the conceptual design. Step-4; Construction of a FNFC facility with the advanced safeguards systems We present a trial application of the SBD concept to a hypothetical FNFC facility with an advanced hybrid K-edge densitometer and a Pu NDA system for spent nuclear fuel assembly using laser Compton scattering (LCS) X-rays and γ-rays and other advanced safeguards systems. (author)

  14. A guide to the management of tailings facilities

    International Nuclear Information System (INIS)

    Bedard, C.; Ferguson, K.; Gladwin, D.; Lang, D.; Maltby, J.; McCann, M.; Poirier, P.; Schwenger, R.; Vezina, S.; West, S.; Duval, J.; Gardiner, E.; Jansons, K.; Lewis, B.; Matthews, J.; Mchaina, D.; Puro, M.; Siwik, R.; Welch, D.

    1998-01-01

    The 'Guide to the Management of Tailings Facilities' has been developed by the Mining Association of Canada in an effort to provide guidance to its member companies on sound practices for the safe and environmentally responsible management of tailings facilities. The guide is a reference tool to help companies ensure that they are managing their tailings facilities responsibly, integrating environmental and safety considerations in a consistent manner, with continuous improvement in the operation of tailings facilities. The key to managing tailings responsibly is consistent application of engineering capabilities through the full life cycle. The guide provides a basis for the development of customized tailings management systems to address specific needs at individual operations, and deals with environmental impacts, mill tailing characteristics, tailings facility studies and plans, dam and related structure design, and control and monitoring. Aspects relating to tailings facility siting, design, construction, operation, decommissioning and closure are also fully treated. 1 tab., 3 figs

  15. Discharge documentation of patients discharged to subacute facilities: a three-year quality improvement process across an integrated health care system.

    Science.gov (United States)

    Gandara, Esteban; Ungar, Jonathan; Lee, Jason; Chan-Macrae, Myrna; O'Malley, Terrence; Schnipper, Jeffrey L

    2010-06-01

    Effective communication among physicians during hospital discharge is critical to patient care. Partners Healthcare (Boston) has been engaged in a multi-year process to measure and improve the quality of documentation of all patients discharged from its five acute care hospitals to subacute facilities. Partners first engaged stakeholders to develop a consensus set of 12 required data elements for all discharges to subacute facilities. A measurement process was established and later refined. Quality improvement interventions were then initiated to address measured deficiencies and included education of physicians and nurses, improvements in information technology, creation of or improvements in discharge documentation templates, training of hospitalists to serve as role models, feedback to physicians and their service chiefs regarding reviewed cases, and case manager review of documentation before discharge. To measure improvement in quality as a result of these efforts, rates of simultaneous inclusion of all 12 applicable data elements ("defect-free rate") were analyzed over time. Some 3,101 discharge documentation packets of patients discharged to subacute facilities from January 1, 2006, through September 2008 were retrospectively studied. During the 11 monitored quarters, the defect-free rate increased from 65% to 96% (p improvements were seen in documentation of preadmission medication lists, allergies, follow-up, and warfarin information. Institution of rigorous measurement, feedback, and multidisciplinary, multimodal quality improvement processes improved the inclusion of data elements in discharge documentation required for safe hospital discharge across a large integrated health care system.

  16. Natural circulation in a scaled PWR integral test facility

    International Nuclear Information System (INIS)

    Kiang, R.L.; Jeuck, P.R. III

    1987-01-01

    Natural circulation is an important mechanism for cooling a nuclear power plant under abnormal operating conditions. To study natural circulation, we modeled a type of pressurized water reactor (PWR) that incorporates once-through steam generators. We conducted tests of single-phase natural circulations, two-phase natural circulations, and a boiler condenser mode. Because of complex geometry, the natural circulations observed in this facility exhibit some phenomena not commonly seen in a simple thermosyphon loop

  17. Modeling integrated biomass gasification business concepts

    Science.gov (United States)

    Peter J. Ince; Ted Bilek; Mark A. Dietenberger

    2011-01-01

    Biomass gasification is an approach to producing energy and/or biofuels that could be integrated into existing forest product production facilities, particularly at pulp mills. Existing process heat and power loads tend to favor integration at existing pulp mills. This paper describes a generic modeling system for evaluating integrated biomass gasification business...

  18. A comprehensive centralized control system for radiation waste treatment facility

    International Nuclear Information System (INIS)

    Kong Jinsong

    2014-01-01

    A comprehensive centralized control system is designed for the radiation waste treatment facility that lacking of coordinated operational mechanism for the radiation waste treatment. The centralized control and alarm linkage of various systems is implemented to ensure effectively the safety of nuclear facility and materials, improve the integral control ability through advanced informatization ways. (author)

  19. Data report for the integrity assessment report HNF-4589

    International Nuclear Information System (INIS)

    MCSHANE, D.S.

    1999-01-01

    Supporting data for the Integrity Assessment Report of Tanks TK-101 and TK-102. The purpose of this document is to compile supporting documentation for the Integrity Assessment Report (HNF 4589) for Tanks 101 and 102 in the 2194 Facility. This approach minimizes the size of the Integrity Assessment Report (IAR) (HNF-4589) and still provide a path to detailed information. This IAR addresses the evaluation of Tanks 101 and 102 and other existing components located in the 219-5 Waste Handling Facility

  20. On-orbit technology experiment facility definition

    Science.gov (United States)

    Russell, Richard A.; Buchan, Robert W.; Gates, Richard M.

    1988-01-01

    A study was conducted to identify on-orbit integrated facility needs to support in-space technology experiments on the Space Station and associated free flyers. In particular, the first task was to examine the proposed technology development missions (TDMX's) from the model mission set and other proposed experimental facilities, both individually and by theme, to determine how and if the experiments might be combined, what equipment might be shared, what equipment might be used as generic equipment for continued experimentation, and what experiments will conflict with the conduct of other experiments or Space Station operations. Then using these results, to determine on-orbit facility needs to optimize the implementation of technology payloads. Finally, to develop one or more scenarios, design concepts, and outfitting requirements for implementation of onboard technology experiments.

  1. Integrated spent nuclear fuel database system

    International Nuclear Information System (INIS)

    Henline, S.P.; Klingler, K.G.; Schierman, B.H.

    1994-01-01

    The Distributed Information Systems software Unit at the Idaho National Engineering Laboratory has designed and developed an Integrated Spent Nuclear Fuel Database System (ISNFDS), which maintains a computerized inventory of all US Department of Energy (DOE) spent nuclear fuel (SNF). Commercial SNF is not included in the ISNFDS unless it is owned or stored by DOE. The ISNFDS is an integrated, single data source containing accurate, traceable, and consistent data and provides extensive data for each fuel, extensive facility data for every facility, and numerous data reports and queries

  2. The LEAN Payload Integration Process

    Science.gov (United States)

    Jordan, Lee P.; Young, Yancy; Rice, Amanda

    2011-01-01

    It is recognized that payload development and integration with the International Space Station (ISS) can be complex. This streamlined integration approach is a first step toward simplifying payload integration; making it easier to fly payloads on ISS, thereby increasing feasibility and interest for more research and commercial organizations to sponsor ISS payloads and take advantage of the ISS as a National Laboratory asset. The streamlined integration approach was addressed from the perspective of highly likely initial payload types to evolve from the National Lab Pathfinder program. Payloads to be accommodated by the Expedite the Processing of Experiments for Space Station (EXPRESS) Racks and Microgravity Sciences Glovebox (MSG) pressurized facilities have been addressed. It is hoped that the streamlined principles applied to these types of payloads will be analyzed and implemented in the future for other host facilities as well as unpressurized payloads to be accommodated by the EXPRESS Logistics Carrier (ELC). Further, a payload does not have to be classified as a National Lab payload in order to be processed according to the lean payload integration process; any payload that meets certain criteria can follow the lean payload integration process.

  3. Integral fast reactor concept

    International Nuclear Information System (INIS)

    Chang, Y.I.; Marchaterre, J.F.; Sevy, R.H.

    1984-01-01

    Key features of the IFR consist of a pool-type plant arrangement, a metal fuel-based core design, and an integral fuel cycle with colocated fuel cycle facility. Both the basic concept and the technology base have been demonstrated through actual integral cycle operation in EBR-II. This paper discusses the inherent safety characteristics of the IFR concept

  4. Public School Desegregation and Education Facilities

    Science.gov (United States)

    Hunter, Richard C.

    2011-01-01

    Early federal court decisions in school desegregation placed little emphasis on public school facilities. Those early decisions focused primarily on requiring black and white students to attend the same schools and requiring the integration of teachers. What does the literature say about the relationship between student achievement and educational…

  5. A cask maintenance facility feasibility study

    International Nuclear Information System (INIS)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01

    The Oak Ridge National Laboratory (ORNL) is supporting the USDOE Office of Civilian Radioactive Waste Management (OCRWM) in developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, green field facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrieveable Storage (MRS) facility. The data, design, and estimated cost resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone green field configuration because of the flexibility this design approach provides. A stand-alone facility requires the inclusion with support functions as well as the primary process facilities thus yielding a comprehensive design evaluation and cost estimate. For example, items such as roads, security and waste processing which might be shared with an integrated or collocated facility have been fully costed in the feasibility study. Thus, while the details of the facility design might change, the overall concept used in the study can be applied to other facility configurations as planning for the total FWMS develops

  6. A facility for training Space Station astronauts

    Science.gov (United States)

    Hajare, Ankur R.; Schmidt, James R.

    1992-01-01

    The Space Station Training Facility (SSTF) will be the primary facility for training the Space Station Freedom astronauts and the Space Station Control Center ground support personnel. Conceptually, the SSTF will consist of two parts: a Student Environment and an Author Environment. The Student Environment will contain trainers, instructor stations, computers and other equipment necessary for training. The Author Environment will contain the systems that will be used to manage, develop, integrate, test and verify, operate and maintain the equipment and software in the Student Environment.

  7. Solving a mathematical model integrating unequal-area facilities layout and part scheduling in a cellular manufacturing system by a genetic algorithm.

    Science.gov (United States)

    Ebrahimi, Ahmad; Kia, Reza; Komijan, Alireza Rashidi

    2016-01-01

    In this article, a novel integrated mixed-integer nonlinear programming model is presented for designing a cellular manufacturing system (CMS) considering machine layout and part scheduling problems simultaneously as interrelated decisions. The integrated CMS model is formulated to incorporate several design features including part due date, material handling time, operation sequence, processing time, an intra-cell layout of unequal-area facilities, and part scheduling. The objective function is to minimize makespan, tardiness penalties, and material handling costs of inter-cell and intra-cell movements. Two numerical examples are solved by the Lingo software to illustrate the results obtained by the incorporated features. In order to assess the effects and importance of integration of machine layout and part scheduling in designing a CMS, two approaches, sequentially and concurrent are investigated and the improvement resulted from a concurrent approach is revealed. Also, due to the NP-hardness of the integrated model, an efficient genetic algorithm is designed. As a consequence, computational results of this study indicate that the best solutions found by GA are better than the solutions found by B&B in much less time for both sequential and concurrent approaches. Moreover, the comparisons between the objective function values (OFVs) obtained by sequential and concurrent approaches demonstrate that the OFV improvement is averagely around 17 % by GA and 14 % by B&B.

  8. Hazards and accident analyses, an integrated approach, for the Plutonium Facility at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Pan, P.Y.; Goen, L.K.; Letellier, B.C.; Sasser, M.K.

    1995-01-01

    This paper describes an integrated approach to perform hazards and accident analyses for the Plutonium Facility at Los Alamos National Laboratory. A comprehensive hazards analysis methodology was developed that extends the scope of the preliminary/process hazard analysis methods described in the AIChE Guidelines for Hazard Evaluations. Results fro the semi-quantitative approach constitute a full spectrum of hazards. For each accident scenario identified, there is a binning assigned for the event likelihood and consequence severity. In addition, each accident scenario is analyzed for four possible sectors (workers, on-site personnel, public, and environment). A screening process was developed to link the hazard analysis to the accident analysis. Specifically the 840 accident scenarios were screened down to about 15 accident scenarios for a more through deterministic analysis to define the operational safety envelope. The mechanics of the screening process in the selection of final scenarios for each representative accident category, i.e., fire, explosion, criticality, and spill, is described

  9. Solid secondary waste testing for maintenance of the Hanford Integrated Disposal Facility Performance Assessment - FY 2017

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Ralph L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Seitz, Roger R. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Dixon, Kenneth L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-08-01

    The Waste Treatment and Immobilization Plant (WTP) at Hanford is being constructed to treat 56 million gallons of radioactive waste currently stored in underground tanks at the Hanford site. Operation of the WTP will generate several solid secondary waste (SSW) streams including used process equipment, contaminated tools and instruments, decontamination wastes, high-efficiency particulate air filters (HEPA), carbon adsorption beds, silver mordenite iodine sorbent beds, and spent ion exchange resins (IXr) all of which are to be disposed in the Integrated Disposal Facility (IDF). An applied research and development program was developed using a phased approach to incrementally develop the information necessary to support the IDF PA with each phase of the testing building on results from the previous set of tests and considering new information from the IDF PA calculations. This report contains the results from the exploratory phase, Phase 1 and preliminary results from Phase 2. Phase 3 is expected to begin in the fourth quarter of FY17.

  10. Holifield Radioactive Ion Beam Facility Development and Status

    CERN Document Server

    Tatum, Alan

    2005-01-01

    The Holifield Radioactive Ion Beam Facility (HRIBF) is a national user facility dedicated to nuclear structure, reactions, and nuclear astrophysics research with radioactive ion beams (RIBs) using the isotope separator on-line (ISOL) technique. An integrated strategic plan for physics, experimental systems, and RIB production facilities have been developed and implementation of the plan is under way. Specific research objectives are defined for studying the nature of nucleonic matter, the origin of elements, solar physics, and synthesis of heavy elements. Experimental systems upgrade plans include new detector arrays and beam lines, and expansion and upgrade of existing devices. A multifaceted facility expansion plan includes a $4.75M High Power Target Laboratory (HPTL), presently under construction, to provide a facility for testing new target materials, target geometries, ion sources, and beam preparation techniques. Additional planned upgrades include a second RIB production system (IRIS2), an external axi...

  11. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR (Integral Fast Reactor) program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. (author)

  12. Dismantlement and decontamination of a plutonium-238 facility at SRS

    International Nuclear Information System (INIS)

    Smith, R.H. Jr.; Hootman, H.E.

    1994-01-01

    There has been very little, documented decontamination and decommissioning (D ampersand D) experience on which to project cleanup costs and schedules for plutonium facilities at SRS and other DOE sites. A portion of the HB-Line, a plutonium-238 processing facility at SRS, has been undergoing D ampersand D intermittently since 1984. Although this cleanup effort was not originally intended to quantify results, some key data have been project has demonstrated effective methods of accumulated, and the performing D ampersand D work, and has demonstrated cleanup equipment and techniques under conditions of high contamination. Plutonium facilities where D ampersand D is already underway provide an opportunity for' timely field testing of characterization, size reduction, and decontamination techniques. Some data are presented here; however, more specific tests and data may be obtained during the remainder of this project. This project has been recommended as a candidate test facility for a DOE planned ''Integrated D ampersand D Demonstration'' managed by EM-50 to develop and demonstrate technology for D ampersand D and surplus facilities deactivation. Both the remainder of this project and the Integrated D ampersand D Demonstration Program can benefit from a joint effort, and the, overall costs should be reduced

  13. Energy Systems Integration: Demonstrating Distributed Grid-Edge Control Hierarchy

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    Overview fact sheet about the OMNETRIC Group Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  14. Spallation Neutron Source Accelerator Facility Target Safety and Non-safety Control Systems

    International Nuclear Information System (INIS)

    Battle, Ronald E.; DeVan, B.; Munro, John K. Jr.

    2006-01-01

    The Spallation Neutron Source (SNS) is a proton accelerator facility that generates neutrons for scientific researchers by spallation of neutrons from a mercury target. The SNS became operational on April 28, 2006, with first beam on target at approximately 200 W. The SNS accelerator, target, and conventional facilities controls are integrated by standardized hardware and software throughout the facility and were designed and fabricated to SNS conventions to ensure compatibility of systems with Experimental Physics Integrated Control System (EPICS). ControlLogix Programmable Logic Controllers (PLCs) interface to instruments and actuators, and EPICS performs the high-level integration of the PLCs such that all operator control can be accomplished from the Central Control room using EPICS graphical screens that pass process variables to and from the PLCs. Three active safety systems were designed to industry standards ISA S84.01 and IEEE 603 to meet the desired reliability for these safety systems. The safety systems protect facility workers and the environment from mercury vapor, mercury radiation, and proton beam radiation. The facility operators operated many of the systems prior to beam on target and developed the operating procedures. The safety and non-safety control systems were tested extensively prior to beam on target. This testing was crucial to identify wiring and software errors and failed components, the result of which was few problems during operation with beam on target. The SNS has continued beam on target since April to increase beam power, check out the scientific instruments, and continue testing the operation of facility subsystems

  15. Pre-test analysis of a LBLOCA using the design data of the ATLAS facility, a reduced-height integral effect test loop for PWRs

    International Nuclear Information System (INIS)

    Hyun-Sik Park; Ki-Yong Choi; Dong-Jin Euh; Tae-Soon Kwon; Won-Pil Baek

    2005-01-01

    Full text of publication follows: The simulation capability of the KAERI integral effect test facility, ATLAS (Advanced Thermalhydraulic Test Loop for Accident Simulation), has been assessed for a large-break loss-of-coolant accident (LBLOCA) transient. The ATLAS facility is a 1/2 height-scaled, 1/144 area-scaled (1/288 in volume scale), and full-pressure test loop based on the design features of the APR1400, an evolutionary pressurized water reactor that has been developed by Korean industry. The APR1400 has four mechanically separated hydraulic trains for the emergency core cooling system (ECCS) with direct vessel injection (DVI). The APR1400 design features have brought about several new safety issues related to the LBLOCA including the steam-water interaction, ECC bypass, and boiling in the reactor vessel downcomer. The ATLAS facility will be used to investigate the multiple responses between the systems or between the components during various anticipated transients. The ATLAS facility has been designed according to a scaling method that is mainly based on the model suggested by Ishii and Kataoka. The ATLAS facility is being evaluated against the prototype plant APR1400 with the same control logics and accident scenarios using the best-estimated code, MARS. This paper briefly introduces the basic design features of the ATLAS facility and presents the results of pre-test analysis for a postulated LBLOCA of a cold leg. The LBLOCA analyses has been conducted to assess the validity of the applied scaling law and the similarity between the ATLAS facility and the APR1400. As the core simulator of the ATLAS facility has the 10% capability of the scaled full power, the blowdown phase can not be simulated, and the starting point of the accident scenario is around the end of blowdown. So it is an important problem to find the correct initial conditions. For the analyzed LBLOCA scenario, the ATLAS facility showed very similar thermal-hydraulic characteristics to the APR

  16. The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Simos N.; Hanson A.; Brown, D.; Elbakhshawn, M.

    2016-04-11

    BLAIRR STUDY STATUS OVERVIEW Beamline Complex Evaluation/Assessment and Adaptation to the Goals Facility Radiological Constraints ? Large scale analyses of conventional facility and integrated shield (concrete, soil)Target Optimization and Design: Beam-target interaction optimization Hadronic interaction and energy deposition limitations Single phase and Hybrid target concepts Irradiation Damage Thermo-mechanical considerations Spallation neutron fluence optimization for (a) fast neutron irradiation damage (b) moderator/reflector studies, (c) NTOF potential and optimization (d) mono-energetic neutron beam

  17. Comparison of three small-break loss-of-coolant accident tests with different break locations using the system-integrated modular advanced reactor-integral test loop facility to estimate the safety of the smart design

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Hwang; Ryu, Sung Uk; Yi, Sung Jae; Park, Hyun Sik [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Dong Eok [Dept. of Precision Mechanical Engineering, Kyungpook National University, Sangju (Korea, Republic of)

    2017-08-15

    Three small-break loss-of-coolant accident (SBLOCA) tests with safety injection pumps were carried out using the integral-effect test loop for SMART (System-integrated Modular Advanced ReacTor), i.e., the SMART-ITL facility. The types of break are a safety injection system line break, shutdown cooling system line break, and pressurizer safety valve line break. The thermal–hydraulic phenomena show a traditional behavior to decrease the temperature and pressure whereas the local phenomena are slightly different during the early stage of the transient after a break simulation. A safety injection using a high-pressure pump effectively cools down and recovers the inventory of a reactor coolant system. The global trends show reproducible results for an SBLOCA scenario with three different break locations. It was confirmed that the safety injection system is robustly safe enough to protect from a core uncovery.

  18. Engineering Evaluation/Cost Analysis for the 100-N Area Ancillary Facilities and Integration Plan

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1997-09-01

    This document presents the results of an engineering evaluation/cost analysis (EE/CA) that was conducted to evaluate alternatives for addressing final disposition of contaminated buildings and structures in the 100-N Area of the Hanford Site. The Hanford Site is located in southeastern Washington State and is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office (RL). In November 1989, the 100 Area of the Hanford Site (as well as the 200, 300, and 1100 Areas) was placed on the U.S. Environmental Protection Agency's National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. The 100 Area NPL includes the 100-N Area, which is in various stages of the remediation process. It has been determined by RL that hazardous substances in the 100-N Area ancillary facilities may present a potential threat to human health or the environment, and that a non-time critical removal action at these facilities is warranted. To help determine the most appropriate action, RL, in cooperation with the Washington State Department of Ecology (Ecology) and the EPA, has prepared this EE/CA. The scope of the evaluation includes the inactive contaminated ancillary facilities in the 100-N Area, the facilities residing in the buffer zone, and the Hanford Generating Plant (HGP) and the solid waste management units (SWMUs) inside HGP support facilities. The 105-N Reactor and 109-N Heat Exchange facilities are excluded from this EE/CA evaluation

  19. ERC Maintenance Implementation Plan for nuclear facilities

    International Nuclear Information System (INIS)

    Franquero, R.C.

    1997-05-01

    The inactive and surplus facilities assigned to the Environmental Restoration Contractor are shut down and have no operating production processes or production materials except for residual contamination. There is a minimal number of operating systems to support surveillance and maintenance or decontamination and decommissioning activities (D ampersand D). These systems may include heating and ventilation, air conditioning, lighting, and other electrical systems. Inactive and surplus facilities will be subject to periodic long-term surveillance to ensure the integrity of structures until D ampersand D. D ampersand D projects are of relatively short duration and end with all systems deactivated. Therefore, a rigorous in-depth maintenance program such as that required for producing nuclear facilities is not required or cost effective

  20. Monitoring System for Storm Readiness and Recovery of Test Facilities: Integrated System Health Management (ISHM) Approach

    Science.gov (United States)

    Figueroa, Fernando; Morris, Jon; Turowski, Mark; Franzl, Richard; Walker, Mark; Kapadia, Ravi; Venkatesh, Meera; Schmalzel, John

    2010-01-01

    Severe weather events are likely occurrences on the Mississippi Gulf Coast. It is important to rapidly diagnose and mitigate the effects of storms on Stennis Space Center's rocket engine test complex to avoid delays to critical test article programs, reduce costs, and maintain safety. An Integrated Systems Health Management (ISHM) approach and technologies are employed to integrate environmental (weather) monitoring, structural modeling, and the suite of available facility instrumentation to provide information for readiness before storms, rapid initial damage assessment to guide mitigation planning, and then support on-going assurance as repairs are effected and finally support recertification. The system is denominated Katrina Storm Monitoring System (KStorMS). Integrated Systems Health Management (ISHM) describes a comprehensive set of capabilities that provide insight into the behavior the health of a system. Knowing the status of a system allows decision makers to effectively plan and execute their mission. For example, early insight into component degradation and impending failures provides more time to develop work around strategies and more effectively plan for maintenance. Failures of system elements generally occur over time. Information extracted from sensor data, combined with system-wide knowledge bases and methods for information extraction and fusion, inference, and decision making, can be used to detect incipient failures. If failures do occur, it is critical to detect and isolate them, and suggest an appropriate course of action. ISHM enables determining the condition (health) of every element in a complex system-of-systems or SoS (detect anomalies, diagnose causes, predict future anomalies), and provide data, information, and knowledge (DIaK) to control systems for safe and effective operation. ISHM capability is achieved by using a wide range of technologies that enable anomaly detection, diagnostics, prognostics, and advise for control: (1

  1. Power Systems Development Facility. Quarterly report, July 1--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This quarterly technical progress report summarizes the work completed during the third quarter of a project entitled Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion. The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phase expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  2. Integration of design and inspection

    Science.gov (United States)

    Simmonds, William H.

    1990-08-01

    Developments in advanced computer integrated manufacturing technology, coupled with the emphasis on Total Quality Management, are exposing needs for new techniques to integrate all functions from design through to support of the delivered product. One critical functional area that must be integrated into design is that embracing the measurement, inspection and test activities necessary for validation of the delivered product. This area is being tackled by a collaborative project supported by the UK Government Department of Trade and Industry. The project is aimed at developing techniques for analysing validation needs and for planning validation methods. Within the project an experimental Computer Aided Validation Expert system (CAVE) is being constructed. This operates with a generalised model of the validation process and helps with all design stages: specification of product requirements; analysis of the assurance provided by a proposed design and method of manufacture; development of the inspection and test strategy; and analysis of feedback data. The kernel of the system is a knowledge base containing knowledge of the manufacturing process capabilities and of the available inspection and test facilities. The CAVE system is being integrated into a real life advanced computer integrated manufacturing facility for demonstration and evaluation.

  3. Environmental Assessment for the NASA First Response Facility

    Science.gov (United States)

    Kennedy, Carolyn

    2003-01-01

    NASA intends to construct a First Response Facility for integrated emergency response and health management. This facility will consolidate the Stennis Space Center fire department, medical clinic, security operations, emergency operations and the energy management and control center. The alternative considered is the "No Action Alternative". The proposed action will correct existing operational weaknesses and enhance capabilities to respond to medical emergencies and mitigate any other possible threats. Environmental impacts include are emissions, wetlands disturbance, solid waste generation, and storm water control.

  4. Development of integrated containment and surveillance system for fast critical facility FCA. Portal and penetration monitors

    International Nuclear Information System (INIS)

    Mukaiyama, Takehiko; Ogawa, Hironobu; Yokota, Yasuhiro.

    1998-01-01

    Manpower and radiation exposure problems, accompanied by frequent Non Destructive Assay (NDA) based inspections at the Fast Critical Facility FCA of Japan Atomic Energy Research Institute (JAERI), are a burden for both the inspectorates and the facility operator. In the hope of alleviating these burdens, the development of containment and surveillance measures for the FCA was initiated in 1979. The integrated containment and surveillance system consists of a portal monitor and a penetration monitor. The reactor building provides an ideal containment measure because of its explosion-proof, airtight structure and limited number of penetrations. The function of the portal monitor is to detect undeclared removal of nuclear material from the reactor building through the doorway. The penetration monitor is designed for surveillance of diversion routes through containment boundaries, and of safeguards related activities for bypassing the portal monitor. The combination of monitoring by the penetration monitor of containment boundaries and all their penetrations except for the doorway, and monitoring by the portal monitor, provides complete coverage of realistic diversion routes. The development of the system was completed in 1988 and the field trial test was conducted for the period of twelve running months. The final report on the field trial was concluded on January 1990. The major conclusion of the report was that the system is effective, reliable and efficient. Following this successful conclusion, the International Atomic Energy Agency (IAEA) accepted the system for meeting its safeguards goals at the FCA on condition that an independent IAEA authentication equipment is provided. The development of the authentication equipment is accomplished as an separate Japan Support Programme for Agency Safeguards (JASPAS) task. (author)

  5. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  6. Startup of the Whiteshell irradiation facility

    International Nuclear Information System (INIS)

    Barnard, J.W.; Stanley, F.W.

    1989-01-01

    Recently, a 10-MeV, 1-kW electron linear accelerator was installed in a specially designed irradiation facility at the Whiteshell Nuclear Research Establishment. The facility was designed for radiation applications research in the development of new radiation processes up to the pilot scale level. The accelerator is of advanced design. Automatic startup via computer control makes it compatible with industrial processing. It has been operated successfully as a fully integrated electron irradiator for a number of applications including curing of plastics and composites, sterilization of medical disposables and animal feed irradiation. We report here on our experience during the first six months of operation. (orig.)

  7. E-4 Test Facility Design Status

    Science.gov (United States)

    Ryan, Harry; Canady, Randy; Sewell, Dale; Rahman, Shamim; Gilbrech, Rick

    2001-01-01

    Combined-cycle propulsion technology is a strong candidate for meeting NASA space transportation goals. Extensive ground testing of integrated air-breathing/rocket system (e.g., components, subsystems and engine systems) across all propulsion operational modes (e.g., ramjet, scramjet) will be needed to demonstrate this propulsion technology. Ground testing will occur at various test centers based on each center's expertise. Testing at the NASA John C. Stennis Space Center will be primarily concentrated on combined-cycle power pack and engine systems at sea level conditions at a dedicated test facility, E-4. This paper highlights the status of the SSC E-4 test Facility design.

  8. Startup of the whiteshell irradiation facility

    Science.gov (United States)

    Barnard, J. W.; Stanley, F. W.

    1989-04-01

    Recently, a 10-MeV, 1-kW electron linear accelerator was installed in a specially designed irradiation facility at the Whiteshell Nuclear Research Establishment. The facility was designed for radiation applications research in the development of new radiation processes up to the pilot scale level. The accelerator is of advanced design. Automatic startup via computer control makes it compatible with industrial processing. It has been operated successfully as a fully integrated electron irradiator for a number of applications including curing of plastics and composites, sterilization of medical disposables and animal feed irradiation. We report here on our experience during the first six months of operation.

  9. Data report for the integrity assessment report HNF-4589

    Energy Technology Data Exchange (ETDEWEB)

    MCSHANE, D.S.

    1999-10-27

    The purpose of this document is to compile supporting documentation for the Integrity Assessment Report (HNF 4589) for Tanks 101 and 102 in the 2194 Facility. This approach minimizes the size of the Integrity Assessment Report (IAR) (HNF-4589) and still provide a path to detailed information. This IAR addresses the evaluation of Tanks 101 and 102 and other existing components located in the 219-5 Waste Handling Facility.

  10. Strategies Used by Facilities in Uganda to Integrate Family Planning ...

    African Journals Online (AJOL)

    Erah

    assistance and coaching from the core team, we integrated routine site/field operations. The performance of each site was monitored using the three FP-HIV care integration indicators – proportion of HIV-positive patients of reproductive age who were: 1) counseled on FP methods at every clinic visit, 2) using at least one FP ...

  11. Development of cloud-operating platform for detention facility design

    Science.gov (United States)

    Tun Lee, Kwan; Hung, Meng-Chiu; Tseng, Wei-Fan; Chan, Yi-Ping

    2017-04-01

    In the past 20 years, the population of Taiwan has accumulated in urban areas. The land development has changed the hydrological environment and resulted in the increase of surface runoff and shortened the time to peak discharge. The change of runoff characteristics increases the flood risk and reduces resilient ability of the city during flood. Considering that engineering measures may not be easy to implement in populated cities, detention facilities set on building basements have been proposed to compromise the increase of surface runoff resulting from development activities. In this study, a web-based operational platform has been developed to integrate the GIS technologies, hydrological analyses, as well as relevant regulations for the design of detention facilities. The design procedure embedded in the system includes a prior selection of type and size of the detention facility, integrated hydrological analysis for the developing site, and inspection of relevant regulations. After login the platform, designers can access the system database to retrieve road maps, land use coverages, and storm sewer information. Once the type, size, inlet, and outlet of the detention facility are assigned, the system can acquire the rainfall intensity-duration-frequency information from adjacent rain gauges to perform hydrological analyses for the developing site. The increase of the runoff volume due to the development and the reduction of the outflow peak through the construction of the detention facility can be estimated. The outflow peak at the target site is then checked with relevant regulations to confirm the suitability of the detention facility design. The proposed web-based platform can provide a concise layout of the detention facility and the drainageway of the developing site on a graphical interface. The design information can also be delivered directly through a web link to authorities for inspecting to simplify the complex administrative procedures.

  12. Service quality for facilities management in hospitals

    CERN Document Server

    Sui Pheng, Low

    2016-01-01

    This book examines the Facilities Management (FM) of hospitals and healthcare facilities, which are among the most complex, costly and challenging kind of buildings to manage. It presents and evaluates the FM service quality standards in Singapore’s hospitals from the patient’s perspective, and provides recommendations on how to successfully improve FM service quality and achieve higher patient satisfaction. The book also features valuable supplementary materials, including a checklist of 32 key factors for successful facilities management and another checklist of 24 service attributes for hospitals to achieve desirable service quality in connection with facilities management. The book adopts a unique approach of combining service quality and quality theory to provide a more holistic view of how FM service quality can be achieved in hospitals. It also integrates three instruments, namely the SERVQUAL model, the Kano model and the QFD model to yield empirical results from surveys for implementation in hosp...

  13. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  14. Federal facilities compliance act waste management

    International Nuclear Information System (INIS)

    Bowers, J.; Gates-Anderson, D.; Hollister, R.; Painter, S.

    1999-01-01

    Site Treatment Plans (STPs) developed through the Federal Facilities Compliance Act pose many technical and administrative challenges. Legacy wastes managed under these plans require Land Disposal Restriction (LDR) compliance through treatment and ultimate disposal. Although capacity has been defined for most of the Department of Energy wastes, many waste streams require further characterization and many need additional treatment and handling beyond LDR criteria to be able to dispose of the waste. At Lawrence Livermore National Laboratory (LLNL), the Hazardous Waste Management Division has developed a comprehensive Legacy Waste Program. The program directs work to manage low level and mixed wastes to ensure compliance with nuclear facility rules and its STP. This paper provides a survey of work conducted on these wastes at LLNL. They include commercial waste treatment and disposal, diverse forms of characterization, inventory maintenance and reporting, on-site treatment, and treatability studies. These activities are conducted in an integrated fashion to meet schedules defined in the STP. The processes managing wastes are dynamic due to required integration of administrative, regulatory, and technical concerns spanning the gamut to insure safe proper disposal

  15. Development of an Integrated Leachate Treatment Solution for the Port Granby Waste Management Facility - 12429

    Energy Technology Data Exchange (ETDEWEB)

    Conroy, Kevin W. [Golder Associates Inc., Lakewood, Colorado (United States); Vandergaast, Gerald [Atomic Energy of Canada Limited, Port Hope, Ontario (Canada)

    2012-07-01

    The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated into the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)

  16. 15 years of The Hungarian integral type test facility: horizontal SG related PMK-2 experiments

    International Nuclear Information System (INIS)

    Perneczky, L.; Ezsoel, G.; Guba, A.; Szabados, L.

    2001-01-01

    support of accident management (AM) procedures. During the 15 operational years - from May 1986 onwards with the first of four IAEA Standard Problem Exercise tests - 48 different experiments, including cold and hot leg break LOCA, primary-to-secondary leakage (PRISE), loss of flow, loss of feedwater, disturbances of natural circulation, etc. tests were performed on this integral type test facility. An overview on 11 experiments related to the operational behaviour of horizontal steam generators performed in framework of national research projects IAEA Technical Co-operation Project RER/9/004 (Standard Problem Exercises) and three EU PHARE projects (in co-operation with AEAT, FRAMATOM, SIEMENS, IPSN, GRS, FZR and VVER owner countries) is given in the first part of paper. In the second part results of two types of tests in shutdown condition with RELAP5 post-test analysis may be of interest to the computer simulation of the horizontal SG too - are summarised. (orig.)

  17. Comparison of three small-break loss-of-coolant accident tests with different break locations using the system-integrated modular advanced reactor-integral test loop facility to estimate the safety of the smart design

    Directory of Open Access Journals (Sweden)

    Hwang Bae

    2017-08-01

    Full Text Available Three small-break loss-of-coolant accident (SBLOCA tests with safety injection pumps were carried out using the integral-effect test loop for SMART (System-integrated Modular Advanced ReacTor, i.e., the SMART-ITL facility. The types of break are a safety injection system line break, shutdown cooling system line break, and pressurizer safety valve line break. The thermal–hydraulic phenomena show a traditional behavior to decrease the temperature and pressure whereas the local phenomena are slightly different during the early stage of the transient after a break simulation. A safety injection using a high-pressure pump effectively cools down and recovers the inventory of a reactor coolant system. The global trends show reproducible results for an SBLOCA scenario with three different break locations. It was confirmed that the safety injection system is robustly safe enough to protect from a core uncovery.

  18. MHD Integrated Topping Cycle Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  19. SNL/CA Facilities Management Design Standards Manual

    Energy Technology Data Exchange (ETDEWEB)

    Rabb, David [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Clark, Eva [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.

  20. Environmental Assessment for Hazardous Waste Staging Facility, Pantex Plant, Amarillo, Texas

    International Nuclear Information System (INIS)

    1993-06-01

    This Environmental Assessment (EA) has been prepared pursuant to the implementing regulations to the National Environmental Policy Act (NEPA), which require federal agencies to assess the environmental impacts of a proposed action to determine whether that action requires the preparation of an Environmental Impact Statement (EIS) or if a Finding of No Significant Impact (FONSI) can be issued. The Pantex Plant does not possess permanent containerized waste staging facilities with integral secondary containment or freeze protection. Additional deficiencies associated with some existing staging facilities include: no protection from precipitation running across the staging pads; lack of protection against weathering; and facility foundations not capable of containing leaks, spills or accumulated precipitation. These shortcomings have raised concerns with respect to requirements under Section 3001 of the Resource Conservation and Recovery Act (RCRA). Deficiencies for these waste staging areas were also cited by a government audit team (Tiger Team) as Action Items. The provision for the staging of hazardous, mixed, and low level waste is part of the no-action altemative in the Programmatic Environmental Impact Statement for the integrated ER/WM program. Construction of this proposed project will not prejudice whether or not this integration will occur, or how

  1. Integrating the hospital information system (HIS) into the Austrian electronic health record ("ELGA") using the example of the health care facility "Breitenstein".

    Science.gov (United States)

    Bonstingl, Martina

    2014-01-01

    The health care facility "Breitenstein" makes use of a hospital information system to coordinate clinical processes and document medical health data. So as to comply with novel Austrian legislation and fit the "ELGA" architecture, the system has to be adapted. This paper is based on a literature research and gives answers to technical and legal aspects of "ELGA". The introduction of an IHE connector and a CDA manager are the main changes to the current hospital information system. The implementation of interfaces that allow an integration of further "ELGA" features possible are the next step of the project.

  2. 241-AY Double Shell Tanks (DST) Integrity Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    JENSEN, C.E.

    1999-09-21

    This report presents the results of the integrity assessment of the 241-AY double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations. are made to ensure the continued safe operation of the tanks.

  3. 241-AN Double Shell Tanks (DST) Integrity Assessment Report

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    1999-01-01

    This report presents the results of the integrity assessment of the 241-AN double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations, are made to ensure the continued safe operation of the tanks

  4. 241-AY Double Shell Tanks (DST) Integrity Assessment Report

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    1999-01-01

    This report presents the results of the integrity assessment of the 241-AY double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations, are made to ensure the continued safe operation of the tanks

  5. 241-SY Double Shell Tanks (DST) Integrity Assessment Report

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    1999-01-01

    This report presents the results of the integrity assessment of the 241-SY double-shell tank farm facility located in the 200 West Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations, are made to ensure the continued safe operation of the tanks

  6. 241-AZ Double-Shell Tanks (DST) Integrity Assessment Report

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    1999-01-01

    This report presents the results of the integrity assessment of the 241-A2 double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations, are made to ensure the continued safe operation of the tanks

  7. 241-AW Double Shell Tanks (DST) Integrity Assessment Report

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    1999-01-01

    This report presents the results of the integrity assessment of the 241-AW double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations, are made to ensure the continued safe operation of the tanks

  8. A New Automated Instrument Calibration Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    Polz, E.; Rushton, R.O.; Wilkie, W.H.; Hancock, R.C.

    1998-01-01

    The Health Physics Instrument Calibration Facility at the Savannah River Site in Aiken, SC was expressly designed and built to calibrate portable radiation survey instruments. The facility incorporates recent advances in automation technology, building layout and construction, and computer software to improve the calibration process. Nine new calibration systems automate instrument calibration and data collection. The building is laid out so that instruments are moved from one area to another in a logical, efficient manner. New software and hardware integrate all functions such as shipping/receiving, work flow, calibration, testing, and report generation. Benefits include a streamlined and integrated program, improved efficiency, reduced errors, and better accuracy

  9. Analysis of integrated video and radiation data

    International Nuclear Information System (INIS)

    Howell, J.A.; Menlove, H.O.; Rodriguez, C.A.; Beddingfield, D.; Vasil, A.

    1995-01-01

    We have developed prototype software for a facility-monitoring application that will detect anomalous activity in a nuclear facility. The software, which forms the basis of a simple model, automatically reviews and analyzes integrated safeguards data from continuous unattended monitoring systems. This technology, based on pattern recognition by neural networks, provides significant capability to analyze complex data and has the ability to learn and adapt to changing situations. It is well suited for large automated facilities, reactors, spent-fuel storage facilities, reprocessing plants, and nuclear material storage vaults

  10. The Australian National Proton Facility

    International Nuclear Information System (INIS)

    Jackson, M.; Rozenfeld, A.; Bishop, J.

    2002-01-01

    Full text: Protons have been used in the treatment of cancer since 1954 and over 30,000 patients have been treated around the world. Their precise dose distribution allows the treatment of small tumours in critical locations such as the base of skull and orbit and is an alternative to stereotactic radiotherapy in other sites. With the development of hospital-based systems in the 1990's, common tumours such as prostate, breast and lung cancer can now also be treated using simple techniques. The therapeutic ratio is improved as the dose to the tumour can be increased while sparing normal tissues. The well defined high dose region and low integral dose compared with photon treatments is a particular advantage in children and other situations where long-term survival is expected and when used in combination with chemotherapy. In January 2002, the NSW Health Department initiated a Feasibility Study for an Australian National Proton Facility. This Study will address the complex medical, scientific, engineering, commercial and legal issues required to design and build a proton facility in Australia. The Facility will be mainly designed for patient treatment but will also provide facilities for biological, physical and engineering research. The proposed facility will have a combination of fixed and rotating beams with an energy range of 70-250 MeV. Such a centre will enable the conduct of randomised clinical trials and a comparison with other radiotherapy techniques such as Intensity Modulated Radiation Therapy. Cost-utility comparisons with other medical treatments will also be made and further facilities developed if the expected benefit is confirmed. When patients are not being treated, the beam will be available for commercial and research purposes. This presentation will summarize the progress of the Study and discuss the important issues that need to be resolved before the Facility is approved and constructed

  11. The grand challenge of managing the petascale facility.

    Energy Technology Data Exchange (ETDEWEB)

    Aiken, R. J.; Mathematics and Computer Science

    2007-02-28

    This report is the result of a study of networks and how they may need to evolve to support petascale leadership computing and science. As Dr. Ray Orbach, director of the Department of Energy's Office of Science, says in the spring 2006 issue of SciDAC Review, 'One remarkable example of growth in unexpected directions has been in high-end computation'. In the same article Dr. Michael Strayer states, 'Moore's law suggests that before the end of the next cycle of SciDAC, we shall see petaflop computers'. Given the Office of Science's strong leadership and support for petascale computing and facilities, we should expect to see petaflop computers in operation in support of science before the end of the decade, and DOE/SC Advanced Scientific Computing Research programs are focused on making this a reality. This study took its lead from this strong focus on petascale computing and the networks required to support such facilities, but it grew to include almost all aspects of the DOE/SC petascale computational and experimental science facilities, all of which will face daunting challenges in managing and analyzing the voluminous amounts of data expected. In addition, trends indicate the increased coupling of unique experimental facilities with computational facilities, along with the integration of multidisciplinary datasets and high-end computing with data-intensive computing; and we can expect these trends to continue at the petascale level and beyond. Coupled with recent technology trends, they clearly indicate the need for including capability petascale storage, networks, and experiments, as well as collaboration tools and programming environments, as integral components of the Office of Science's petascale capability metafacility. The objective of this report is to recommend a new cross-cutting program to support the management of petascale science and infrastructure. The appendices of the report document current and projected

  12. Actinide integral measurements in the CFRMF and integral tests for ENDF/B-V

    International Nuclear Information System (INIS)

    Anderl, R.A.

    1982-01-01

    Integral capture and/or fission rates have been reported earlier for several actinides irradiated in the fast neutron field of the Coupled Fast Reactivity Measurements Facility (CFRMF). These nuclides include 232 Th, 233 U, 235 U, 238 U, 237 Np, 239 Pu, 240 Pu, 242 Pu, 241 Am and 243 Am. This paper forucses on the utilization of these integral data for testing the respective cross sections on ENDF/B-V. Integral cross sections derived from the measured reaction rates are tabulated. Results are presented for cross-section data testing which includes integral testing based on a comparison of calculated and measured integral cross sections and testing based on least-squares-adjustment analyses

  13. Experimental facility for development of high-temperature reactor technology: instrumentation needs and challenges - 15066

    International Nuclear Information System (INIS)

    Sabharwall, P.; O'Brien, J.E.; Yoon, S.J.; Sun, X.

    2015-01-01

    A high-temperature, multi-fluid, multi-loop test facility is under development at the Idaho National Laboratory for support of thermal hydraulic, materials, and system integration research for high-temperature reactors. The experimental facility includes a high-temperature helium loop, a liquid salt loop, and a hot water/steam loop. The 3 loops will be thermally coupled through an intermediate heat exchanger (IHX) and a secondary heat exchanger (SHX). Research topics to be addressed include the characterization and performance evaluation of candidate compact heat exchangers such as printed circuits heat exchangers (PCHEs) at prototypical operating conditions. Each loop will also include an interchangeable high-temperature test section that can be customized to address specific research issues associated with each working fluid. This paper also discusses needs and challenges associated with advanced instrumentation for the multi-loop facility, which could be further applied to advanced high-temperature reactors. Based on its relevance to advanced reactor systems, the new facility has been named the Advanced Reactor Technology Integrated System Test (ARTIST) facility. A preliminary design configuration of the ARTIST facility will be presented with the required design and operating characteristics of the various components. The initial configuration will include a high-temperature (750 C. degrees), high-pressure (7 MPa) helium loop thermally integrated with a molten fluoride salt (KF-ZrF 4 ) flow loop operating at low pressure (0.2 MPa), at a temperature of ∼ 450 C. degrees. The salt loop will be thermally integrated with the steam/water loop operating at PWR conditions. Experiment design challenges include identifying suitable materials and components that will withstand the required loop operating conditions. The instrumentation needs to be highly accurate (negligible drift) in measuring operational data for extended periods of times, as data collected will be

  14. Clinician perceptions and patient experiences of antiretroviral treatment integration in primary health care clinics, Tshwane, South Africa.

    Science.gov (United States)

    Mathibe, Maphuthego D; Hendricks, Stephen J H; Bergh, Anne-Marie

    2015-10-02

    Primary Health Care (PHC) clinicians and patients are major role players in the South African antiretroviral treatment programme. Understanding their perceptions and experiences of integrated care and the management of people living with HIV and AIDS in PHC facilities is necessary for successful implementation and sustainability of integration. This study explored clinician perceptions and patient experiences of integration of antiretroviral treatment in PHC clinics. An exploratory, qualitative study was conducted in four city of Tshwane PHC facilities. Two urban and two rural facilities following different models of integration were included. A self-administered questionnaire with open-ended items was completed by 35 clinicians and four focus group interviews were conducted with HIV-positive patients. The data were coded and categories were grouped into sub-themes and themes. Workload, staff development and support for integration affected clinicians' performance and viewpoints. They perceived promotion of privacy, reduced discrimination and increased access to comprehensive care as benefits of service integration. Delays, poor patient care and patient dissatisfaction were viewed as negative aspects of integration. In three facilities patients were satisfied with integration or semi-integration and felt common queues prevented stigma and discrimination, whilst the reverse was true in the facility with separate services. Single-month issuance of antiretroviral drugs and clinic schedule organisation was viewed negatively, as well as poor staff attitudes, poor communication and long waiting times. Although a fully integrated service model is preferable, aspects that need further attention are management support from health authorities for health facilities, improved working conditions and appropriate staff development opportunities.

  15. Work in Progress : Learner-Centered Online Learning Facility

    NARCIS (Netherlands)

    Pantic, M.; Zwitserloot, R.; De Weerdt, M.M.

    2006-01-01

    This paper describes a novel, learner-centered technology for authoring web lectures. Besides seamless integration of video and audio feeds, Microsoft PowerPoint slides, and web-pages, the proposed Online Learning Facility (OLF) also facilitates online interactive testing and review of covered

  16. DMS test summary report for the WRAP facility

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, J.R.

    1997-11-04

    This report documents the functional and integration testing process performed to verify functionality of the Release 1.1, Release 2.0, Release 3.0 and Release 3.1 software for the Waste Receiving and Processing Facility (WRAP) Data Management Systems (DMS) Release 2.

  17. DMS test summary report for the WRAP facility

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1997-01-01

    This report documents the functional and integration testing process performed to verify functionality of the Release 1.1, Release 2.0, Release 3.0 and Release 3.1 software for the Waste Receiving and Processing Facility (WRAP) Data Management Systems (DMS) Release 2

  18. Facility effluent monitoring plan for the B plant

    International Nuclear Information System (INIS)

    Lesser, J.E.

    1994-09-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plant assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated every three years

  19. An experimental investigation of 1% SBLOCA on PSB-VVER test facility

    Energy Technology Data Exchange (ETDEWEB)

    Lipatov, I.A.; Dremin, G.I.; Galtchanskaia, S.A.; Gorbunov, Yu.S. [Electrogorsk Research and Engineering Center, EREC, Electrogorsk (Russian Federation); Elkin, I.V. [Russian Research Centre Kurchatov Inst., Moscow (Russian Federation)

    2001-07-01

    The paper presents the results of the three tests carried out in the PSB-VVER large-scale integral test facility. The PSB-VVER test facility is a four loop, full pressure scaled down model bearing structural similarities to the primary system of the NRP with VVER-1000 Russian design reactor. Volume-power scale is 1/300 while elevation scale is 1/1. (orig.)

  20. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  1. Evaluation of the seismic integrity of a plutonium-handling facility

    International Nuclear Information System (INIS)

    Coats, D.W.

    1981-01-01

    Many studies have been made by and for the Lawrence Livermore National Laboratory (LLNL) to ensure the seismic safety of its Plutonium Facility (Building 332). These studies have included seismological and geologic field investigations to define the actual seismic hazard existing at the Laboratory site as well as structural studies of the Facility itself. Because the basic seismic design criteria has undergone changes over the years, numerous structural studies and upgrades have been completed. The seismic criteria in use at the LLNL site is reviewed on a continuing basis as new information on the seismicity and geology of the Livermore Valley is obtained. At present, the Laboratory's Earth Sciences Division is conducting a multi-million dollar program to identify and characterize the geologic hazards at the Livermore site, with the primary emphasis on earthquake hazards in the Livermore Valley. This effort is undergoing an independent review by Woodward-Clyde Associates. Additionally, because of increased concerns over the seismic safety of Building 332, the Laboratory has initiated an independent structural review. This review effort will be monitored by the California Seismic Safety Commission to ensure its independence. Both of these studiies are in their early stages and results are not yet available

  2. Air ventilation/controlling facility

    Energy Technology Data Exchange (ETDEWEB)

    Yoshikawa, Kazuhiro; Kinoshita, Shoichiro

    1997-12-12

    When all electricity supply from the outside of a power plant are lost, a power generator directly connected to an emergency steam turbine which is driven by steams introduced from a nuclear reactor is driven to supply electricity required in the power plant. Cool water prepared by a refrigerator is used as cooling water in an air ventilation/controlling facility of a room equipped with the power generating facility. As the refrigerator, a refrigerator of an existent emergency air cooling water system for an auxiliary air ventilation/controlling equipment is used. This can extend the period of time till the temperature of the room where the power generator is disposed exceeds the temperature range capable of keeping the integrity of the power generator even when all the AC power supply are lost to inactivate the function of the air ventilation/controlling system. (I.S.)

  3. Computer security at ukrainian nuclear facilities: interface between nuclear safety and security

    International Nuclear Information System (INIS)

    Chumak, D.; Klevtsov, O.

    2015-01-01

    Active introduction of information technology, computer instrumentation and control systems (I and C systems) in the nuclear field leads to a greater efficiency and management of technological processes at nuclear facilities. However, this trend brings a number of challenges related to cyber-attacks on the above elements, which violates computer security as well as nuclear safety and security of a nuclear facility. This paper considers regulatory support to computer security at the nuclear facilities in Ukraine. The issue of computer and information security considered in the context of physical protection, because it is an integral component. The paper focuses on the computer security of I and C systems important to nuclear safety. These systems are potentially vulnerable to cyber threats and, in case of cyber-attacks, the potential negative impact on the normal operational processes can lead to a breach of the nuclear facility security. While ensuring nuclear security of I and C systems, it interacts with nuclear safety, therefore, the paper considers an example of an integrated approach to the requirements of nuclear safety and security

  4. Environmental information document defense waste processing facility

    International Nuclear Information System (INIS)

    1981-07-01

    This report documents the impact analysis of a proposed Defense Waste Processing Facility (DWPF) for immobilizing high-level waste currently being stored on an interim basis at the Savannah River Plant (SRP). The DWPF will process the waste into a form suitable for shipment to and disposal in a federal repository. The DWPF will convert the high-level waste into: a leach-resistant form containing above 99.9% of all the radioactivity, and a residue of slightly contaminated salt. The document describes the SRP site and environs, including population, land and water uses; surface and subsurface soils and waters; meteorology; and ecology. A conceptual integrated facility for concurrently producing glass waste and saltcrete is described, and the environmental effects of constructing and operating the facility are presented. Alternative sites and waste disposal options are addressed. Also environmental consultations and permits are discussed

  5. Experimental facility for development of high-temperature reactor technology: instrumentation needs and challenges

    Directory of Open Access Journals (Sweden)

    Sabharwall Piyush

    2015-01-01

    Full Text Available A high-temperature, multi-fluid, multi-loop test facility is under development at the Idaho National Laboratory for support of thermal hydraulic materials, and system integration research for high-temperature reactors. The experimental facility includes a high-temperature helium loop, a liquid salt loop, and a hot water/steam loop. The three loops will be thermally coupled through an intermediate heat exchanger (IHX and a secondary heat exchanger (SHX. Research topics to be addressed include the characterization and performance evaluation of candidate compact heat exchangers such as printed circuit heat exchangers (PCHEs at prototypical operating conditions. Each loop will also include an interchangeable high-temperature test section that can be customized to address specific research issues associated with each working fluid. This paper also discusses needs and challenges associated with advanced instrumentation for the multi-loop facility, which could be further applied to advanced high-temperature reactors. Based on its relevance to advanced reactor systems, the new facility has been named the Advanced Reactor Technology Integral System Test (ARTIST facility. A preliminary design configuration of the ARTIST facility will be presented with the required design and operating characteristics of the various components. The initial configuration will include a high-temperature (750 °C, high-pressure (7 MPa helium loop thermally integrated with a molten fluoride salt (KF-ZrF4 flow loop operating at low pressure (0.2 MPa, at a temperature of ∼450 °C. The salt loop will be thermally integrated with the steam/water loop operating at PWR conditions. Experiment design challenges include identifying suitable materials and components that will withstand the required loop operating conditions. The instrumentation needs to be highly accurate (negligible drift in measuring operational data for extended periods of times, as data collected will be

  6. Social integration in a reversed integration neighbourhood? : Perspectives of neighbours, family members, and direct support professionals and the role of formal and informal support

    NARCIS (Netherlands)

    Venema, Eleonora

    2016-01-01

    This research focused on the social integration of people with intellectual disabilities who live in a reversed integration neighbourhood. Reversed integration means that the grounds of the residential facility is turned into a regular neighbourhood wherein people with and without intellectual

  7. The DOE position on the MRS [monitored retrievable storage] facility

    International Nuclear Information System (INIS)

    1989-06-01

    The DOE supports the development of an MRS facility as an integral part of the waste-management system because an MRS facility would allow the DOE to better meet its strategic objectives of timely disposal, timely and adequate waste acceptance, schedule confidence, and system flexibility. This facility would receive, store, and stage shipments of intact spent fuel to the repository and could be later expanded to perform additional functions that may be determined to be beneficial or required as the system design matures. Recognizing the difficulty of DOE-directed siting through national or regional screening, the DOE prefers an MRS facility that is sited through the efforts of the Nuclear Waste Negotiator, especially if the siting negotiations lead to linkages that allow the advantages of an MRS facility to be more fully realized. Even if such revised linkages are not achieved, however, the DOE supports the development of the MRS facility. 23 refs

  8. Investigation of analytical and experimental behavior of nuclear facility ventilation systems

    International Nuclear Information System (INIS)

    Smith, P.R.; Ricketts, C.I.; Andrae, R.W.; Bolstad, J.W.; Horak, H.L.; Martin, R.A.; Tang, P.K.; Gregory, W.S.

    1979-01-01

    The behavior of nuclear facility ventilation systems subjected to both natural and man-caused accidents is being investigated. The purpose of the paper is to present a program overview and highlight recent results of the investigations. The program includes both analytical and experimental investigations. Computer codes for predicting accident-induced gas dynamics and test facilities to obtain supportive experimental data to define structural integrity and confinement effectiveness of ventilation system components are described. A unique test facility and recently obtained structural limits for high efficiency particulate air filters are reported

  9. Integrating cut-and-solve and semi-Lagrangean based dual ascent for the single-source capacitated facility location problem

    DEFF Research Database (Denmark)

    Gadegaard, Sune Lauth

    polytope with generalized upper bounds. From our computational study, we show that the semi-Lagrangean relaxation approach has its merits when the instances are tightly constrained with regards to the capacity of the system, but that it is very hard to compete with a standalone implementation of the cut......This paper describes how the cut-and-solve framework and semi-Lagrangean based dual ascent algorithms can be integrated in two natural ways in order to solve the single source capacitated facility location problem. The first uses the cut-and-solve framework both as a heuristic and as an exact...... solver for the semi-Lagrangean subproblems. The other uses a semi-Lagrangean based dual ascent algorithm to solve the sparse problems arising in the cut-and-solve algorithm. Furthermore, we developed a simple way to separate a special type of cutting planes from what we denote the effective capacity...

  10. Experimental integrated photovoltaic systems

    International Nuclear Information System (INIS)

    Pop-Jordanov, Jordan; Markovska, Natasha; Dimitrov, D.; Kocev, K.; Dimitrovski, D.

    2000-01-01

    Recently, the interest in building-integrated photovoltaic installations has started to increase within governmental and municipality authorities, as well as some industrial companies. To serve a national public-awareness program of solar electricity promotion and education, the indigenous solar energy potential, optimization of possible PV installation, and three test cases of building-integrated grid-connected experimental facilities have been studied. The results showed the feasibility and performance of the proposed concepts. (Original)

  11. Investigation of primary-to-secondary leakage accident on the PSB-VVER integral test facility

    International Nuclear Information System (INIS)

    Lipatov, I.A.; Dremin, G.I.; Galtchanskaya, S.A.; Chmal, I.I.; Moloshnikov, A.S.; Gorbunov, Y.S.; Antonova, A.I.; Elkin, I.V.

    2001-01-01

    The full text follows. The paper presents the main results from the test on primary-to-secondary leakage of 100 mm in equivalent diameter. The test was performed on the PSB-VVER integral test facility. PSB-VVER is a 4-loops scaled down model of primary system of NPP with VVER-1000 Russian type reactor. Volume - power scale is about 1/300 while elevation scale is 1/1. All components of the primary system of the reference NPP are modeled on PSB-VVER. Both passive (accumulators) and active (high and low pressure) ECCSs, pressurizer spray and relief circuits, feed water system and atmospheric dumping system (ADS) as well as the primary circuit gas remove emergency system are also simulated. The primary-to-secondary leakage was simulated using an external break line which connects the upper part of the hot header to SG water volume. The break line included a break nozzle (a cylindrical channel d = 5.8 mm, l/d = 10 with sharp inlet edge), quick-acting valve and two-phase mass flow rate measurement system. In addition loss of off-site power at the moment when a scram-signal is generated was assumed in the experiment. Thus the accident is to be considered as a beyond-design-basic one. The loss of off-site power results in the following: -main circulation pump shutdown; -pressurizer heaters switching off; -HPIS water cooling flow rate and number of points of water injection are reduced The study focuses on the adequacy of the associated accident management (AM) procedure developed by EDO ''GIDROPRESS'' as a General Designer of VVER-type reactors. The AM-procedure was adopted to the PSB-VVER test facility conditions using CATHARE (France) and DINAMIKA (Russia) codes analysis. The AM-procedure in PSB-VVER is as follows: after about 30 min of the onset of the accident, when the accident type and the localization of the SG affected become evident for the operator, he closes all the main steam isolation valves, inhibits the ADS actuation in the affected SG and begins to remove

  12. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    In April 1985, the Department of Energy (DOE) selected the Clinch River site as its preferred site for the construction and operation of the monitored retrievable storage (MRS) facility (USDOE, 1985). In support of the DOE MRS conceptual design activity, available data describing the site have been gathered and analyzed. A composite geotechnical description of the Clinch River site has been developed and is presented herein. This report presents Clinch River site description data in the following sections: general site description, surface hydrologic characteristics, groundwater characteristics, geologic characteristics, vibratory ground motion, surface faulting, stability of subsurface materials, slope stability, and references. 48 refs., 35 figs., 6 tabs

  13. Influence of the heat losses and accumulated heat upon the evolution of the thermohydraulic processes in the transients as applied to the ISB-WWER integral test facility

    International Nuclear Information System (INIS)

    Gashenko, I.V.; Melikhov, O.I.; Shmal, I.I.; Kouznetsov, V.D.

    2001-01-01

    The results of the calculational study using the RELAP5/MOD3.2 thermalhydraulic code performed on the influence of the heat losses to the ambient and the heat accumulated in the pipelines walls upon the evolution of the thermalhydraulic processes in the primary circuit of the integral test facility ISB-WWER when simulating the transients caused by the loss of the coolant are presented in the paper. (authors)

  14. Full scale BWR containment LOCA response test at the INKA test facility

    International Nuclear Information System (INIS)

    Wagner, Thomas; Leyer, Stephan

    2015-01-01

    KERENA is an innovative boiling water reactor concept with passive safety systems (Generation III+) of AREVA. The reactor is an evolutionary design of operating BWRs (Generation II). In order to verify the functionality and performance of the KERENA safety concept required for the transient and accident management, the test facilityIntegral Teststand Karlstein” (INKA) was built at Karlstein (Germany). It is a mock-up of the KERENA boiling water reactor containment, with integrated pressure suppression system. The complete chain of passive safety components is available. The passive components and the levels are represented in full scale. The volume scaling of the containment compartments is approximately 1:24. The reactor pressure vessel (RPV) is simulated via the steam accumulator of the Karlstein Large Valve Test Facility. This vessel provides an energy storage capacity of approximately 1/6 of the KERENA RPV and is supplied by a Benson boiler with a thermal power of 22 MW. With respect to the available power supply, the containment- and system-sizing of the facility is by far the largest one of its kind worldwide. From 2009 to 2012, several single component tests were conducted (Emergency Condenser, Containment Cooling Condenser, Core Flooding System etc.). On March 21st, 2013, the worldwide first large-scale only passively managed integral accident test of a boiling water reactor was simulated at INKA. The integral test measured the combined response of the KERENA passive safety systems to the postulated initiating event was the “Main Steam Line Break” (MSLB) inside the Containment with decay heat simulation. The results of the performed integral test (MSLB) showed that the passive safety systems alone are capable to bring the plant to stable conditions meeting all required safety targets with sufficient margins. Therefore the test verified the function of those components and the interplay between them as response to an anticipated accident scenario

  15. A national facility for biological cryo-electron microscopy

    International Nuclear Information System (INIS)

    Saibil, Helen R.; Grünewald, Kay; Stuart, David I.

    2015-01-01

    This review provides a brief update on the use of cryo-electron microscopy for integrated structural biology, along with an overview of the plans for the UK national facility for electron microscopy being built at the Diamond synchrotron. Three-dimensional electron microscopy is an enormously powerful tool for structural biologists. It is now able to provide an understanding of the molecular machinery of cells, disease processes and the actions of pathogenic organisms from atomic detail through to the cellular context. However, cutting-edge research in this field requires very substantial resources for equipment, infrastructure and expertise. Here, a brief overview is provided of the plans for a UK national three-dimensional electron-microscopy facility for integrated structural biology to enable internationally leading research on the machinery of life. State-of-the-art equipment operated with expert support will be provided, optimized for both atomic-level single-particle analysis of purified macromolecules and complexes and for tomography of cell sections. The access to and organization of the facility will be modelled on the highly successful macromolecular crystallography (MX) synchrotron beamlines, and will be embedded at the Diamond Light Source, facilitating the development of user-friendly workflows providing near-real-time experimental feedback

  16. Graphics-based nuclear facility modeling and management

    International Nuclear Information System (INIS)

    Rod, S.R.

    1991-07-01

    Nuclear waste management facilities are characterized by their complexity, many unprecedented features, and numerous competing design requirements. This paper describes the development of comprehensive descriptive databases and three-dimensional models of nuclear waste management facilities and applies the database/model to an example facility. The important features of the facility database/model are its abilities to (1) process large volumes of site data, plant data, and nuclear material inventory data in an efficient, integrated manner; (2) produce many different representations of the data to fulfill information needs as they arise; (3) create a complete three-dimensional solid model of the plant with all related information readily accessible; and (4) support complete, consistent inventory control and plant configuration control. While the substantive heart of the system is the database, graphic visualization of the data vastly improves the clarity of the information presented. Graphic representations are a convenient framework for the presentation of plant and inventory data, allowing all types of information to be readily located and presented in a manner that is easily understood. 2 refs., 5 figs., 1 tab

  17. Clinician perceptions and patient experiences of antiretroviral treatment integration in primary health care clinics, Tshwane, South Africa

    Directory of Open Access Journals (Sweden)

    Maphuthego D. Mathibe

    2015-10-01

    Full Text Available Background: Primary Health Care (PHC clinicians and patients are major role players in the South African antiretroviral treatment programme. Understanding their perceptions and experiences of integrated care and the management of people living with HIV and AIDS in PHC facilities is necessary for successful implementation and sustainability of integration. Objective: This study explored clinician perceptions and patient experiences of integration of antiretroviral treatment in PHC clinics. Method: An exploratory, qualitative study was conducted in four city of Tshwane PHC facilities. Two urban and two rural facilities following different models of integration were included. A self-administered questionnaire with open-ended items was completed by 35 clinicians and four focus group interviews were conducted with HIV-positive patients. The data were coded and categories were grouped into sub-themes and themes. Results: Workload, staff development and support for integration affected clinicians’ performance and viewpoints. They perceived promotion of privacy, reduced discrimination and increased access to comprehensive care as benefits of service integration. Delays, poor patient care and patient dissatisfaction were viewed as negative aspects of integration. In three facilities patients were satisfied with integration or semi-integration and felt common queues prevented stigma and discrimination, whilst the reverse was true in the facility with separate services. Single-month issuance of antiretroviral drugs and clinic schedule organisation was viewed negatively, as well as poor staff attitudes, poor communication and long waiting times. Conclusion: Although a fully integrated service model is preferable, aspects that need further attention are management support from health authorities for health facilities, improved working conditions and appropriate staff development opportunities.

  18. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    Science.gov (United States)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1999-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  19. Romanian network for structural integrity assessment of nuclear components

    International Nuclear Information System (INIS)

    Roth, Maria; Constantinescu, Dan Mihai; Brad, Sebastian; Ducu, Catalin

    2008-01-01

    Full text: Based of the Romanian option to develop and operate nuclear facilities, using as model the networks created at European level and taking into account the international importance of the structural integrity assessments for lifetime extension of the nuclear components, a national Project started since 2005 in the framework of the National Program 'Research of Excellence', Modulus I 2006-2008, managed by the Ministry of Education and Research. Entitled 'Integrated Network for Structural Integrity Monitoring of Critical Components in Nuclear Facilities', with the acronym RIMIS, the Project had two main objectives: - to elaborate a procedure applicable to the structural integrity assessment of the critical components used in Romanian nuclear facilities; - to integrate the national networking in a similar one, at European level, to enhance the scientific significance of Romanian R and D organizations as well as to increase the contribution to solving one of the major issue of the nuclear field. The paper aimed to present the activities performed in the Romanian institutes, involved in the Project, the final results obtained as part of the R and D activities, including experimental, theoretical and modeling ones regarding structural integrity assessment of nuclear components employed in CANDU type reactors. Also the activity carried out in the framework of the NULIFE network, created at European level of the FP6 Program and sustained by the RIMIS network will be described. (authors)

  20. Radioactive waste package assay facility. Final report - V. A

    International Nuclear Information System (INIS)

    Molesworth, T.V.; Strachan, N.R.; Findlay, D.J.S.; Wise, M.O.; Forrest, K.R.; Rogers, J.D.

    1993-01-01

    This report provides a summary of research work carried out in support of the development of an integrated assay system for the quality checking of Intermediate Level Waste encapsulated in cement. Four non-destructive techniques were originally identified as being viable methods for obtaining radiometric inventory data from a cemented 500 litre ILW package. The major part of the programme was devoted to the development of two interrogation techniques; active neutron for measuring the total fissile content and active gamma for measuring the total actinide content. An electron linear accelerator was used to supply the interrogating beam for these two methods. In addition the linear accelerator beam could be used for high energy radiography. The results of this work are described and the performances and limitations of the non-destructive methods are summarised. The main engineering and operational features which influence the design of an integrated assay facility are outlined and a conceptual layout for a facility to inspect 750 ILW drums a year is described. Details of the detection methods, data processing and potential application of the assay facility are given in three associated HMIP reports. (Author)

  1. Assessment of the effectiveness of personal visual observation as a safeguards measure in a uranium enrichment facility

    International Nuclear Information System (INIS)

    Ohno, Fubito; Okamoto, Tsuyoshi; Yokochi, Akira; Nidaira, Kazuo

    2003-01-01

    In a centrifuge enrichment facility, a cascade that produces low enriched uranium is composed of a large number of UF 6 gas centrifuges interconnected with pipes. It is possible to divert the cascade to the illegal production of highly enriched uranium (HEU) by changing the piping arrangement within the cascade. If integrated type centrifuges that contain a few tens of advanced centrifuges are introduced into the facility, the number of pipes will greatly decrease. The smaller the number of pipes, the less the labor required to change the piping arrangement. Because personal visual observation by an inspector is considered as one of measures against changing the piping arrangement, its effectiveness is assessed in this study. First, a model centrifuge enrichment facility that has a capacity of 2,400 ton-SWU/y is designed. In this model facility, integrated type centrifuges that contain advanced centrifuges are installed. Second, the diversion path analysis is carried out for the model facility under the assumption that a facility operator's goal is to produce 75 kg of HEU with 20% enrichment in a month. The analysis shows that, in our assumed diversion path, changes of the piping arrangement can be certainly detected by personal visual observation of a part of pipes connected with integrated type centrifuges that compose the cascade diverted to the HEU production. Finally, inspections in a cascade area are modeled as two-person noncooperative games between the inspector and the facility operator. As a result, it is found that all the cascades in the model facility will be investigated if the inspector can devote the inspection effort of 0.83 man-day per month to personal visual observation in the cascade area. Therefore, it is suggested that personal visual observation of the piping arrangement is worth carrying out in a uranium enrichment facility where integrated type centrifuges that contain advanced centrifuges are installed. (author)

  2. Methodology and technology of decommissioning nuclear facilities

    International Nuclear Information System (INIS)

    1986-01-01

    The decommissioning and decontamination of nuclear facilities is a topic of great interest to many Member States of the International Atomic Energy Agency (IAEA) because of the large number of older nuclear facilities which are or soon will be retired from service. In response to increased international interest in decommissioning and to the needs of Member States, the IAEA's activities in this area have increased during the past few years and will be enhanced considerably in the future. A long range programme using an integrated systems approach covering all the technical, regulatory and safety steps associated with the decommissioning of nuclear facilities is being developed. The database resulting from this work is required so that Member States can decommission their nuclear facilities in a safe time and cost effective manner and the IAEA can effectively respond to requests for assistance. The report is a review of the current state of the art of the methodology and technology of decommissioning nuclear facilities including remote systems technology. This is the first report in the IAEA's expanded programme and was of benefit in outlining future activities. Certain aspects of the work reviewed in this report, such as the recycling of radioactive materials from decommissioning, will be examined in depth in future reports. The information presented should be useful to those responsible for or interested in planning or implementing the decommissioning of nuclear facilities

  3. Air ambulance services--integrated emergency care.

    Science.gov (United States)

    Ferdinand, M

    1994-10-01

    In the name of cost-conscious care, air ambulance program directors and service contractors are seeing the dawn of integrated networks as a boon to their business. As integrated networks form, facilities will become increasingly specialized in the types of services they provide. Patients will need to be moved around the system, resulting in more frequent patient transport and more points of transfer. Many programs are considering aircraft replacement and additions, rather than leasing. Financial benefits could come on depreciation and the high resale value of aircraft. Unless reimbursement levels increase, more program mergers and affiliations may take place to spread and reduce cost. Air ambulance services will increasingly become part of a facility's strategic plan.

  4. Automated System Calibration and Verification of the Position Measurements for the Los Alamos Isotope Production Facility and the Switchyard Kicker Facilities

    Science.gov (United States)

    Barr, D.; Gilpatrick, J. D.; Martinez, D.; Shurter, R. B.

    2004-11-01

    The Los Alamos Neutron Science Center (LANSCE) facility at Los Alamos National Laboratory has constructed both an Isotope Production Facility (IPF) and a Switchyard Kicker (XDK) as additions to the H+ and H- accelerator. These additions contain eleven Beam Position Monitors (BPMs) that measure the beam's position throughout the transport. The analog electronics within each processing module determines the beam position using the log-ratio technique. For system reliability, calibrations compensate for various temperature drifts and other imperfections in the processing electronics components. Additionally, verifications are periodically implemented by a PC running a National Instruments LabVIEW virtual instrument (VI) to verify continued system and cable integrity. The VI communicates with the processor cards via a PCI/MXI-3 VXI-crate communication module. Previously, accelerator operators performed BPM system calibrations typically once per day while beam was explicitly turned off. One of this new measurement system's unique achievements is its automated calibration and verification capability. Taking advantage of the pulsed nature of the LANSCE-facility beams, the integrated electronics hardware and VI perform calibration and verification operations between beam pulses without interrupting production beam delivery. The design, construction, and performance results of the automated calibration and verification portion of this position measurement system will be the topic of this paper.

  5. Concept for a small, colocated fuel cycle facility for oxide breeder fuels

    International Nuclear Information System (INIS)

    Burch, W.D.; Stradley, J.G.; Lerch, R.E.

    1987-01-01

    As part of a United States Department of Energy (USDOE) program to examine innovative liquid-metal reactor (LMR) system designs over the past three years, the Oak Ridge National Laboratory (ORNL) and the Westinghouse Hanford Company (WHC) collaborated on studies of mixed oxide fuel cycle options. A principal effort was an advanced concept for a small integrated fuel cycle colocated with a 1300-MW(e) reactor station. The study provided a scoping design and a basis on which to proceed with implementation of such a facility if future plans so dictate. The facility integrated reprocessing, waste management, and refabrication functions in a single facility of nominal 35-t/year capacity utilizing the latest technology developed in fabrication programs at WHC and in reprocessing at ORNL. The concept was based on many years of work at both sites and extensive design studies of prior years

  6. Concept for a small, colocated fuel cycle facility for oxide breeder fuels

    International Nuclear Information System (INIS)

    Burch, W.D.; Lerch, R.E.; Stradley, J.G.

    1987-01-01

    As part of a United States Department of Energy (USDOE) program to examine innovative liquid-metal reactor (LMR) system designs over the past three years, the Oak Ridge National Laboratory (ORNL) and the Westinghouse Hanford Company (WHC) collaborated on studies of mixed oxide fuel cycle options. A principal effort was an advanced concept for a small integrated fuel cycle colocated with a 1300-MW(e) reactor station. The study provided a scoping design, capital and operating cost estimates, and a basis on which to proceed with implementation of such a facility if future plans so dictate. The facility integrated reprocessing, waste management, and refabrication functions in a single facility of nominal 35-t/year capacity utilizing the latest technology developed in fabrication programs at WHC and in reprocessing at ORNL. The concept was based on many years of work at both sites and extensive design studies of prior years

  7. Fuel Cell Development and Test Laboratory | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Fuel Cell Development and Test Laboratory Fuel Cell Development and Test Laboratory The Energy System Integration Facility's Fuel Cell Development and Test Laboratory supports fuel cell research and development projects through in-situ fuel cell testing. Photo of a researcher running

  8. Energy Systems High-Pressure Test Laboratory | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Energy Systems High-Pressure Test Laboratory Energy Systems High-Pressure Test Laboratory In the Energy Systems Integration Facility's High-Pressure Test Laboratory, researchers can safely test high-pressure hydrogen components. Photo of researchers running an experiment with a hydrogen fuel

  9. Technology integration plan

    International Nuclear Information System (INIS)

    Henry, R.; Sumpter, K.C.

    1995-01-01

    In 1992, the Secretary of Energy directed the Assistant Secretary for Environmental Management (EM) to develop an integrated, long-term, spent nuclear fuel (SNF) management program. In response, EM created the Integrated SNF Program to assess the US Department of Energy (DOE) SNF and SNF storage facilities. As shown in Figure 1 the Integrated SNF Program is responsible for life-cycle management of DOE SNF; that is characterization, processing, interim storage and preparation for disposal. In order to implement the Program it was recognized that technology needs must be identified. A Technology Integration Program was formed to integrate the DOE complex-wide efforts for establishing timely, cost effective and consistent technical criteria for the development of technical solutions. The program is directed toward identification of: (a) what activities need to be done, (b) when they need to be completed, and (c) what priority should be assigned to the various activities

  10. 242-A Evaporator/Liquid Effluent Retention Facility data quality objectives

    International Nuclear Information System (INIS)

    Von Bargen, B.H.

    1994-01-01

    The purpose of data quality objectives (DQO) is to determine the most cost effective methods of gathering the essential data necessary to make decisions to support successful operation of the facility. The essential data is defined by such information as sample amount, sample location, required analyses, and how sampling and analyses are performed. Successful operation is defined as meeting the campaign objectives while operating within established requirements. This DQO document addresses that portion of the system from 242-A Evaporator candidate feed tanks through discharge of process condensate to the Liquid Effluent Retention of Facility (LERF). Later revisions will incorporate and integrate the entire system, including the Effluent Treatment Facility (ETF)

  11. 242-A Evaporator/Liquid Effluent Retention Facility data quality objectives

    Energy Technology Data Exchange (ETDEWEB)

    Von Bargen, B.H.

    1994-09-29

    The purpose of data quality objectives (DQO) is to determine the most cost effective methods of gathering the essential data necessary to make decisions to support successful operation of the facility. The essential data is defined by such information as sample amount, sample location, required analyses, and how sampling and analyses are performed. Successful operation is defined as meeting the campaign objectives while operating within established requirements. This DQO document addresses that portion of the system from 242-A Evaporator candidate feed tanks through discharge of process condensate to the Liquid Effluent Retention of Facility (LERF). Later revisions will incorporate and integrate the entire system, including the Effluent Treatment Facility (ETF).

  12. Use of an integrated human health/ecological risk assessment to develop a long-term groundwater/site management plan for a sour gas facility

    International Nuclear Information System (INIS)

    Swanson, S.M.; Shaw, R.D.; McClymont, G.; Nadeau, S.

    1995-01-01

    An integrated human health and ecological risk assessment was used to quantify the level of risk associated with the off-site movement of contaminants via groundwater and soils at a medium-sized gas processing facility in southern Alberta. The study incorporated three key aspects: (1) integration; (2) consultation; and, (3) pro-active remedial actions. Integration was complete, beginning with the Problem Formulation stage and progressing through Risk Characterization and Risk Management. This integration was reflected in a multidisciplinary team of hydrogeologists, biologists and human health specialists. Several lessons emerged from the integrated approach: (1) spending 2/3 of the time and resources on Problem Formulation prevented later problems; (2) the different perspectives provided by the various specialists helped reveal the relative importance of pathways and ecological receptors (3) clear, consistent screening procedures for contaminants of concern and receptors were very effective with stakeholders; (4) exposure scenarios that incorporated common-sense situations (although still conservative) contributed to the credibility of the risk analysis; and, (5) an innovative combination of toxicity testing and chemical analysis helped delineate the boundaries of the potentially contaminated area for both human and ecological receptors in a cost effective manner. Consultation included directly affected parties, regulatory personnel and community members. The consultation extended through the project, with key ''buy-in'' points during Problem Formulation and Risk Characterization/Management. Pro-active remedial action included the removal of contaminant sources in the 1980's, a pump-and-treat system and extensive monitoring. These actions showed commitment and set the stage for credible risk-based mitigation and long-term monitoring

  13. Integration of bicycling and walking facilities into the infrastructure of urban communities.

    Science.gov (United States)

    2012-02-01

    Several manuals, handbooks and web resources exist to provide varied guidance on planning for and designing bicycle and pedestrian facilities, yet there are no specific indications about which of the varied treatments in these guides work well for us...

  14. Hazardous waste treatment facility and skid-mounted treatment systems at Los Alamos

    International Nuclear Information System (INIS)

    Lussiez, G.W.; Zygmunt, S.J.

    1993-01-01

    To centralize treatment, storage, and staging areas for hazardous wastes, Los Alamos National Laboratory has designed a 12,000-ft 2 hazardous waste treatment facility. The facility will house a treatment room for each of four kinds of wastes: nonradioactive characteristic wastes, nonradioactive listed wastes radioactive characteristic wastes, and radioactive listed wastes. The facility will be used for repacking labpacks, bulking small organic waste volumes, processing scintillation vials, treating reactives such as lithium hydride and pyrophoric uranium, treating contaminated solids such as barium sand, and treating plating wastes. The treated wastes will then be appropriately disposed of. This report describes the integral features of the hazardous waste treatment facility

  15. A whole-school approach to facilities maintenance / Velaphi Aaron Nhlapo.

    OpenAIRE

    Nhlapo, Velaphi Aaron

    2009-01-01

    The area of school facilities maintenance as an integral component of schools' educational programmes is only beginning to receive attention in South Africa, through the publishing of Notice 1438 of 2008 of the National Education Policy, which is a call for comments on the National Policy for an Equitable Provision of an Enabling School Physical Teaching and Learning Environment. This implies that, while it is a critical aspect of teaching and learning, school facilities maintenance has not b...

  16. Investigation of accident management procedures related to loss of feedwater and station blackout in PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Bucalossi, A. [EC JRC, (JRC F.5) PO Box 2, 1755 ZG Petten (Netherlands); Del Nevo, A., E-mail: alessandro.delnevo@enea.it [ENEA, C.R. Brasimone, 40032 Camugnano (Italy); Moretti, F.; D' Auria, F. [GRNSPG, Universita di Pisa, via Diotisalvi 2, 56100 Pisa (Italy); Elkin, I.V.; Melikhov, O.I. [Electrogorsk Research and Engineering Centre, Electrogorsk, Moscow Region (Russian Federation)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Four integral test facility experiments related to VVER-1000 reactor. Black-Right-Pointing-Pointer TH response of the VVER-1000 primary system following total loss of feedwater and station blackout scenarios. Black-Right-Pointing-Pointer Accident management procedures in case of total loss of feedwater and station blackout. Black-Right-Pointing-Pointer Experimental data represent an improvement of existing database for TH code validation. - Abstract: VVER 1000 reactors have some unique and specific features (e.g. large primary and secondary side fluid inventory, horizontal steam generators, core design) that require dedicated experimental and analytical analyses in order to assess the performance of safety systems and the effectiveness of possible accident management strategies. The European Commission funded project 'TACIS 2.03/97', Part A, provided valuable experimental data from the large-scale (1:300) PSB-VVER test facility, investigating accident management procedures in VVER-1000 reactor. A test matrix was developed at University of Pisa (responsible of the project) with the objective of obtaining the experimental data not covered by the OECD VVER validation matrix and with main focus on accident management procedures. Scenarios related to total loss of feed water and station blackout are investigated by means of four experiments accounting for different countermeasures, based on secondary cooling strategies and primary feed and bleed procedures. The transients are analyzed thoroughly focusing on the identification of phenomena that will challenge the code models during the simulations.

  17. ALICE-ARC integration

    DEFF Research Database (Denmark)

    Anderlik, Csaba; Gregersen, Anders Rhod; Kleist, Josva

    2008-01-01

    Data Grid Facility (NDGF). In this paper we will present our approach to integrate AliEn and ARC, in the sense that ALICE data management and job processing can be carried out on the NDGF infrastructure, using the client tools available in AliEn. The interoperation has two aspects, one is the data...

  18. Progress in preliminary studies at Ottana Solar Facility

    Science.gov (United States)

    Demontis, V.; Camerada, M.; Cau, G.; Cocco, D.; Damiano, A.; Melis, T.; Musio, M.

    2016-05-01

    The fast increasing share of distributed generation from non-programmable renewable energy sources, such as the strong penetration of photovoltaic technology in the distribution networks, has generated several problems for the management and security of the whole power grid. In order to meet the challenge of a significant share of solar energy in the electricity mix, several actions aimed at increasing the grid flexibility and its hosting capacity, as well as at improving the generation programmability, need to be investigated. This paper focuses on the ongoing preliminary studies at the Ottana Solar Facility, a new experimental power plant located in Sardinia (Italy) currently under construction, which will offer the possibility to progress in the study of solar plants integration in the power grid. The facility integrates a concentrating solar power (CSP) plant, including a thermal energy storage system and an organic Rankine cycle (ORC) unit, with a concentrating photovoltaic (CPV) plant and an electrical energy storage system. The facility has the main goal to assess in real operating conditions the small scale concentrating solar power technology and to study the integration of the two technologies and the storage systems to produce programmable and controllable power profiles. A model for the CSP plant yield was developed to assess different operational strategies that significantly influence the plant yearly yield and its global economic effectiveness. In particular, precise assumptions for the ORC module start-up operation behavior, based on discussions with the manufacturers and technical datasheets, will be described. Finally, the results of the analysis of the: "solar driven", "weather forecasts" and "combined storage state of charge (SOC)/ weather forecasts" operational strategies will be presented.

  19. Thermal Hydraulic Integral Effect Tests for Pressurized Water Reactors

    International Nuclear Information System (INIS)

    Baek, Won Pil; Song, C. H.; Kim, Y. S.

    2007-02-01

    The objectives of the project are to construct a thermal-hydraulic integral effect test facility and to perform the tests for design, operation, and safety regulation of pressurized water reactors. In the first phase of this project (1997.8∼2002.3), the basic technology for thermal-hydraulic integral effect tests was established and the basic design of the test facility was accomplished. In the second phase (2002.4∼2005.2), an optimized design of the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation) was established and the construction of the facility was almost completed. In the third phase (2005.3∼2007.2), the construction and commission tests of the ATLAS are to be completed and some first-phase tests are to be conducted

  20. Integrating Safeguards and Security with Safety into Design

    International Nuclear Information System (INIS)

    Bean, Robert S.; Hockert, John W.; Hebditch, David J.

    2009-01-01

    There is a need to minimize security risks, proliferation hazards, and safety risks in the design of new nuclear facilities in a global environment of nuclear power expansion, while improving the synergy of major design features and raising operational efficiency. In 2008, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) launched the Next Generation Safeguards Initiative (NGSI) covering many safeguards areas. One of these, launched by NNSA with support of the DOE Office of Nuclear Energy, was a multi-laboratory project, led by the Idaho National Laboratory (INL), to develop safeguards by design. The proposed Safeguards-by-Design (SBD) process has been developed as a structured approach to ensure the timely, efficient, and cost effective integration of international safeguards and other nonproliferation barriers with national material control and accountability, physical security, and safety objectives into the overall design process for the nuclear facility lifecycle. A graded, iterative process was developed to integrate these areas throughout the project phases. It identified activities, deliverables, interfaces, and hold points covering both domestic regulatory requirements and international safeguards using the DOE regulatory environment as exemplar to provide a framework and guidance for project management and integration of safety with security during design. Further work, reported in this paper, created a generalized SBD process which could also be employed within the licensed nuclear industry and internationally for design of new facilities. Several tools for integrating safeguards, safety, and security into design are discussed here. SBD appears complementary to the EFCOG TROSSI process for security and safety integration created in 2006, which focuses on standardized upgrades to enable existing DOE facilities to meet a more severe design basis threat. A collaborative approach is suggested.

  1. Status of spent fuel storage facilities in Switzerland

    International Nuclear Information System (INIS)

    Beyeler, P.C.; Lutz, H.R.; Heesen, W. von

    1999-01-01

    Planning of a dry spent fuel storage facility in Switzerland started already 15 years ago. The first site considered for a central interim storage facility was the cavern of the decommissioned pilot nuclear plant at Lucens in the French-speaking part of Switzerland. This project was terminated in the late eighties because of lack of public acceptance. The necessary acceptance was found in the small town of Wuerenlingen which has hosted for many years the Swiss Reactor Research Centre. The new project consists of centralised interim storage facilities for all types of radioactive waste plus a hot cell and a conditioning and incinerating facility. It represents a so-called integrated storage solution. In 1990, the new company 'ZWILAG Zwischenlager Wuerenlingen AG' (ZWILAG) was founded and the licensing procedures according to the Swiss Atomic law were initiated. On August 26, 1996 ZWILAG got the permit for construction of the whole facility including the operating permit for the storage facilities. End of construction and commissioning are scheduled for autumn 1999. The nuclear power station Beznau started planning a low level waste and spent fuel storage facility on its own, because in 1990 its management thought that by 1997 the first high active waste from the reprocessing facilities in France would have to be taken back. This facility at the Beznau site, called ZWIBEZ, was licensed according to a shorter procedure so its construction was finished by 1997. The two facilities for high level waste and spent fuel provide space for a total of 278 casks, which is sufficient for the waste and spent fuel of the four Swiss nuclear power stations including their life extension programme. (author)

  2. Power systems development facility. Quarterly technical progress report, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  3. 26 CFR 1.188-1 - Amortization of certain expenditures for qualified on-the-job training and child care facilities.

    Science.gov (United States)

    2010-04-01

    ... qualified on-the-job training and child care facilities. 1.188-1 Section 1.188-1 Internal Revenue INTERNAL... qualified on-the-job training and child care facilities. (a) Allowance of deduction—(1) In general. Under... operation of a qualified on-the-job training or child care facility or are integrally related facilities...

  4. A web-based three-tier control and monitoring application for integrated facility management of photovoltaic systems

    Directory of Open Access Journals (Sweden)

    Apostolos Meliones

    2014-01-01

    Full Text Available The architecture of a control system can be designed vertically with the distinction between functional levels. We adopt this layered approach for the design and implementation of a network-based control and monitoring application. In this paper we present the design and implementation of a network-based management application for controlling and monitoring the input and output data of remote equipment aiming at performance macro-observation, alarm detection, handling operation failures, installation security, access control, collection and recording of statistical data and provisioning of reports. The main services provided to the user and operating over the public internet and/or mobile network include control, monitoring, notification, reporting and data export. Our proposed system consists of a front-end for field (site-level control and monitoring as well as a service back-end which undertakes to collect, store and manage data from all remote installations. Hierarchical data acquisition methodology and performance macro-observation are according to the IEC 61724 standard. We have successfully used our control and monitoring application for integrated facility management of photovoltaic plant installations; nevertheless it can be easily migrated to other renewable energy generation installations and remote automation applications in general.

  5. A study on surveillance equipment at the exit/entry control point of nuclear facility

    International Nuclear Information System (INIS)

    Park, C. S.; Kim, D. Y.; Cha, H. L.; Kim, H. D.; Hong, J. S.

    1999-01-01

    Exit/Entry control is an essential measure at both entrances of the protected area and vital area of nuclear facility at which physical protection is required under the relevant laws and regulations. Especially, when there are heavy traffics of personnel and process equipment in those areas, automated surveillance devices have to be introduced to timely and efficiently screen out internal and external adversaries from achieving their goals of stealing of nuclear material and/or sabotage of the facility. The major portion of this study involves with integration and processing of signals from radiation detector, metal detector, and image monitor. This integrated device together with positive personal identification device which will be reinforced in near future would contribute to the establishment of total exit/entry control point of nuclear facility

  6. Facility Effluent Monitoring Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Robinson, A.V.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems against applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. The current operation of the 222-S facilities includes the provision of analytical and radiological chemistry services in support of Hanford Site processing plants. The emphasis is on waste management, chemical processing, environmental monitoring effluent programs at B Plant, the Uranium Oxide Plant, Tank Farms, the 242-A Evaporator, the Waste Encapsulation and Storage Facility, the Plutonium-Uranium Extraction Facility, the Plutonium Finishing Plant, process development/impact activities, and essential materials. The laboratory also supplies analytical services in support of ongoing waste tank characterization

  7. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  8. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, R.L.

    1997-05-07

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  9. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    International Nuclear Information System (INIS)

    McCormack, R.L.

    1997-01-01

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O'Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE's baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  10. Spent Fuel Handling and Packaging Program: a survey of hot cell facilities

    International Nuclear Information System (INIS)

    Menon, M.N.

    1978-07-01

    Hot cell facilities in the United States were surveyed to determine their capabilities for conducting integral fuel assembly and individual fuel rod examinations that are required in support of the Spent Fuel Handling and Packaging Program. The ability to receive, handle, disassemble and reconstitute full-length light water reactor spent fuel assemblies, and the ability to conduct nondestructive and destructive examinations on full-length fuel rods were of particular interest. Three DOE-supported facilities and three commercial facilities were included in the survey. This report provides a summary of the findings

  11. Development of high integrity, maximum durability concrete structures for LLW disposal facilities

    International Nuclear Information System (INIS)

    Taylor, W.P.

    1992-01-01

    A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slag and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs

  12. Relative evaluation on decommissioning accident scenarios of nuclear facilities

    International Nuclear Information System (INIS)

    Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jei-Kwon; Hyun, Dong-Jun; Kim, Geun-Ho; Kim, Tae-Hyoung; Jo, Kyung-Hwa; Seo, Jae-Seok; Jeong, Seong-Young; Lee, Jung-Jun

    2012-01-01

    Highlights: ► This paper suggests relative importance on accident scenarios during decommissioning of nuclear facilities. ► The importance of scenarios can be performed by using AHP and Sugeno fuzzy method. ► The AHP and Sugeno fuzzy method guarantee reliability of the importance evaluation. -- Abstract: This paper suggests the evaluation method of relative importance on accident scenarios during decommissioning of nuclear facilities. The evaluation method consists of AHP method and Sugeno fuzzy integral method. This method will guarantee the reliability of relative importance evaluation for decommissioning accident scenarios.

  13. Stored energy analysis in the scaled-down test facilities

    International Nuclear Information System (INIS)

    Deng, Chengcheng; Chang, Huajian; Qin, Benke; Wu, Qiao

    2016-01-01

    Highlights: • Three methods are developed to evaluate stored energy in the scaled-down test facilities. • The mechanism behind stored energy distortion in the test facilities is revealed. • The application of stored energy analysis is demonstrated for the ACME facility of China. - Abstract: In the scaled-down test facilities that simulate the accident transient process of the prototype nuclear power plant, the stored energy release in the metal structures has an important influence on the accuracy and effectiveness of the experimental data. Three methods of stored energy analysis are developed, and the mechanism behind stored energy distortion in the test facilities is revealed. Moreover, the application of stored energy analysis is demonstrated for the ACME test facility newly built in China. The results show that the similarity requirements of three methods analyzing the stored energy release decrease gradually. The physical mechanism of stored energy release process can be characterized by the dimensionless numbers including Stanton number, Fourier number and Biot number. Under the premise of satisfying the overall similarity of natural circulation, the stored energy release process in the scale-down test facilities cannot maintain exact similarity. The results of the application of stored energy analysis illustrate that both the transient release process and integral total stored energy of the reactor pressure vessel wall of CAP1400 power plant can be well reproduced in the ACME test facility.

  14. Multiloop integral system test (MIST): Final report, Inter-group comparisons

    Energy Technology Data Exchange (ETDEWEB)

    Gloudemans, J.R.

    1989-07-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock and Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The individual tests are described in detail in Volumes 2 through 8 and Volume 11, and are summarized in Volume 1. Inter-group comparisons are addressed in this document, Volume 9. These comparisons are grouped as follows: mapping versus SBLOCA transients, SBLOCA, pump effects, and the effects of noncondensible gases. Appendix A provides an index and description of the microfiched plots for each test, which are enclosed with the corresponding Volumes 2 through 8. 147 figs., 5 tabs.

  15. An integrated analytical framework for quantifying the LCOE of waste-to-energy facilities for a range of greenhouse gas emissions policy and technical factors

    International Nuclear Information System (INIS)

    Townsend, Aaron K.; Webber, Michael E.

    2012-01-01

    This study presents a novel integrated method for considering the economics of waste-to-energy (WTE) facilities with priced greenhouse gas (GHG) emissions based upon technical and economic characteristics of the WTE facility, MSW stream, landfill alternative, and GHG emissions policy. The study demonstrates use of the formulation for six different policy scenarios and explores sensitivity of the results to ranges of certain technical parameters as found in existing literature. The study shows that details of the GHG emissions regulations have large impact on the levelized cost of energy (LCOE) of WTE and that GHG regulations can either increase or decrease the LCOE of WTE depending on policy choices regarding biogenic fractions from combusted waste and emissions from landfills. Important policy considerations are the fraction of the carbon emissions that are priced (i.e. all emissions versus only non-biogenic emissions), whether emissions credits are allowed due to reducing fugitive landfill gas emissions, whether biogenic carbon sequestration in landfills is credited against landfill emissions, and the effectiveness of the landfill gas recovery system where waste would otherwise have been buried. The default landfill gas recovery system effectiveness assumed by much of the industry yields GHG offsets that are very close to the direct non-biogenic GHG emissions from a WTE facility, meaning that small changes in the recovery effectiveness cause relatively larger changes in the emissions factor of the WTE facility. Finally, the economics of WTE are dependent on the MSW stream composition, with paper and wood being advantageous, metal and glass being disadvantageous, and plastics, food, and yard waste being either advantageous or disadvantageous depending upon the avoided tipping fee and the GHG emissions price.

  16. Information for Child Care Providers about Pesticides/Integrated Pest Management

    Science.gov (United States)

    Learn about pesticides/integrated pest management, the health effects associated with exposure to pests and pesticides, and the steps that can be taken to use integrated pest management strategies in childcare facilities.

  17. Support of Construction and Verification of Out-of-Pile Fuel Assembly Test Facilities

    International Nuclear Information System (INIS)

    Park, Nam Gyu; Kim, K. T.; Park, J. K.

    2006-12-01

    Fuel assembly and components should be verified by the out-of-pile test facilities in order to load the developed fuel in reactor. Even though most of the component-wise tests have been performed using the facilities in land, the assembly-wise tests has been depended on the oversees' facility due to the lack of the facilities. KAERI started to construct the assembly-wise mechanical/hydraulic test facilities and KNF, as an end user, is supporting the mechanical/hydraulic test facility construction by using the technologies studied through the fuel development programs. The works performed are as follows: - Test assembly shipping container design and manufacturing support - Fuel handling tool design : Gripper, Upper and lower core simulators for assembly mechanical test facility, Internals for assembly hydraulic test facility - Manufacture of test specimens : skeleton and assembly for preliminary functional verification of assembly mechanical/hydraulic test facilities, two assemblies for the verification of assembly mechanical/hydraulic test facilities, Instrumented rod design and integrity evaluation - Verification of assembly mechanical/hydraulic test facilities : test data evaluation

  18. Support of Construction and Verification of Out-of-Pile Fuel Assembly Test Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Park, Nam Gyu; Kim, K. T.; Park, J. K. [KNF, Daejeon (Korea, Republic of)] (and others)

    2006-12-15

    Fuel assembly and components should be verified by the out-of-pile test facilities in order to load the developed fuel in reactor. Even though most of the component-wise tests have been performed using the facilities in land, the assembly-wise tests has been depended on the oversees' facility due to the lack of the facilities. KAERI started to construct the assembly-wise mechanical/hydraulic test facilities and KNF, as an end user, is supporting the mechanical/hydraulic test facility construction by using the technologies studied through the fuel development programs. The works performed are as follows: - Test assembly shipping container design and manufacturing support - Fuel handling tool design : Gripper, Upper and lower core simulators for assembly mechanical test facility, Internals for assembly hydraulic test facility - Manufacture of test specimens : skeleton and assembly for preliminary functional verification of assembly mechanical/hydraulic test facilities, two assemblies for the verification of assembly mechanical/hydraulic test facilities, Instrumented rod design and integrity evaluation - Verification of assembly mechanical/hydraulic test facilities : test data evaluation.

  19. Associations Among Health Care Workplace Safety, Resident Satisfaction, and Quality of Care in Long-Term Care Facilities.

    Science.gov (United States)

    Boakye-Dankwa, Ernest; Teeple, Erin; Gore, Rebecca; Punnett, Laura

    2017-11-01

    We performed an integrated cross-sectional analysis of relationships between long-term care work environments, employee and resident satisfaction, and quality of patient care. Facility-level data came from a network of 203 skilled nursing facilities in 13 states in the eastern United States owned or managed by one company. K-means cluster analysis was applied to investigate clustered associations between safe resident handling program (SRHP) performance, resident care outcomes, employee satisfaction, rates of workers' compensation claims, and resident satisfaction. Facilities in the better-performing cluster were found to have better patient care outcomes and resident satisfaction; lower rates of workers compensation claims; better SRHP performance; higher employee retention; and greater worker job satisfaction and engagement. The observed clustered relationships support the utility of integrated performance assessment in long-term care facilities.

  20. NDA for a new facility at SRP

    International Nuclear Information System (INIS)

    Studley, R.V.

    1987-01-01

    In 1980, plans were initiated to build a new facility to process high purity highly enriched 235 U. Interest in improving nuclear safeguards had been increasing in the previous few years. A basic objective of the design, therefore, included achievement of maximum performance in special nuclear material (SNM) accountability. A near-real-time accountability system with high accuracy assay measurements was developed for this purpose. Simultaneous design of facility, process equipment, and the accountability system allowed maximum integration of equipment and also permitted influence on process design and material characteristics to optimize accountability performance. This was an ideal situation in which to pursue maximum improvement in nondestructive assay (NDA) measurement performance. The resulting systems are described

  1. Development of Demonstration Facility Design Technology for Advanced Nuclear Fuel Cycle Process

    International Nuclear Information System (INIS)

    Cho, Il Je; You, G. S.; Choung, W. M.

    2010-04-01

    The main objective of this R and D is to develop the PRIDE (PyRoprocess Integrated inactive DEmonstration) facility for engineering-scale inactive test using fresh uranium, and to establish the design requirements of the ESPF (Engineering Scale Pyroprocess Facility) for active demonstration of the pyroprocess. Pyroprocess technology, which is applicable to GEN-IV systems as one of the fuel cycle options, is a solution of the spent fuel accumulation problems. PRIDE Facility, pyroprocess mock-up facility, is the first facility that is operated in inert atmosphere in the country. By using the facility, the functional requirements and validity of pyroprocess technology and facility related to the advanced fuel cycle can be verified with a low cost. Then, PRIDE will contribute to evaluate the technology viability, proliferation resistance and possibility of commercialization of the pyroprocess technology. The PRIDE evaluation data, such as performance evaluation data of equipment and operation experiences, will be directly utilized for the design of ESPF

  2. Integrated Urban Flood Analysis considering Optimal Operation of Flood Control Facilities in Urban Drainage Networks

    Science.gov (United States)

    Moon, Y. I.; Kim, M. S.; Choi, J. H.; Yuk, G. M.

    2017-12-01

    eavy rainfall has become a recent major cause of urban area flooding due to the climate change and urbanization. To prevent property damage along with casualties, a system which can alert and forecast urban flooding must be developed. Optimal performance of reducing flood damage can be expected of urban drainage facilities when operated in smaller rainfall events over extreme ones. Thus, the purpose of this study is to execute: A) flood forecasting system using runoff analysis based on short term rainfall; and B) flood warning system which operates based on the data from pump stations and rainwater storage in urban basins. In result of the analysis, it is shown that urban drainage facilities using short term rainfall forecasting data by radar will be more effective to reduce urban flood damage than using only the inflow data of the facility. Keywords: Heavy Rainfall, Urban Flood, Short-term Rainfall Forecasting, Optimal operating of urban drainage facilities. AcknowledgmentsThis research was supported by a grant (17AWMP-B066744-05) from Advanced Water Management Research Program (AWMP) funded by Ministry of Land, Infrastructure and Transport of Korean government.

  3. Concepts for inventory verification in critical facilities

    International Nuclear Information System (INIS)

    Cobb, D.D.; Sapir, J.L.; Kern, E.A.; Dietz, R.J.

    1978-12-01

    Materials measurement and inventory verification concepts for safeguarding large critical facilities are presented. Inspection strategies and methods for applying international safeguards to such facilities are proposed. The conceptual approach to routine inventory verification includes frequent visits to the facility by one inspector, and the use of seals and nondestructive assay (NDA) measurements to verify the portion of the inventory maintained in vault storage. Periodic verification of the reactor inventory is accomplished by sampling and NDA measurement of in-core fuel elements combined with measurements of integral reactivity and related reactor parameters that are sensitive to the total fissile inventory. A combination of statistical sampling and NDA verification with measurements of reactor parameters is more effective than either technique used by itself. Special procedures for assessment and verification for abnormal safeguards conditions are also considered. When the inspection strategies and inventory verification methods are combined with strict containment and surveillance methods, they provide a high degree of assurance that any clandestine attempt to divert a significant quantity of fissile material from a critical facility inventory will be detected. Field testing of specific hardware systems and procedures to determine their sensitivity, reliability, and operational acceptability is recommended. 50 figures, 21 tables

  4. Emission Facilities - Erosion & Sediment Control Facilities

    Data.gov (United States)

    NSGIC Education | GIS Inventory — An Erosion and Sediment Control Facility is a DEP primary facility type related to the Water Pollution Control program. The following sub-facility types related to...

  5. Ion beams from high-current PF facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sadowski, M [Soltan Inst. for Nuclear Studies, Otwock-Swierk (Poland)

    1997-12-31

    Pulsed beams of fast deuterons and impurity or admixture ions emitted from high-current PF-type facilities operated in different laboratories are dealt with. A short comparative analysis of time-integrated and time-resolved studies is presented. Particular attention is paid to the microstructure of such ion beams, and to the verification of some theoretical models. (author). 5 figs., 19 refs.

  6. Sandia National Laboratories: Integrated Military Systems

    Science.gov (United States)

    Defense Systems & Assessments About Defense Systems & Assessments Program Areas Accomplishments Audit Sandia's Economic Impact Licensing & Technology Transfer Browse Technology Portfolios ; Culture Work-Life Balance Special Programs Integrated Military Systems (IMS) Capabilities Facilities

  7. ATLAS Facility Description Report

    International Nuclear Information System (INIS)

    Kang, Kyoung Ho; Moon, Sang Ki; Park, Hyun Sik; Cho, Seok; Choi, Ki Yong

    2009-04-01

    A thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), has been constructed at KAERI (Korea Atomic Energy Research Institute). The ATLAS has the same two-loop features as the APR1400 and is designed according to the well-known scaling method suggested by Ishii and Kataoka to simulate the various test scenarios as realistically as possible. It is a half-height and 1/288-volume scaled test facility with respect to the APR1400. The fluid system of the ATLAS consists of a primary system, a secondary system, a safety injection system, a break simulating system, a containment simulating system, and auxiliary systems. The primary system includes a reactor vessel, two hot legs, four cold legs, a pressurizer, four reactor coolant pumps, and two steam generators. The secondary system of the ATLAS is simplified to be of a circulating loop-type. Most of the safety injection features of the APR1400 and the OPR1000 are incorporated into the safety injection system of the ATLAS. In the ATLAS test facility, about 1300 instrumentations are installed to precisely investigate the thermal-hydraulic behavior in simulation of the various test scenarios. This report describes the scaling methodology, the geometric data of the individual component, and the specification and the location of the instrumentations in detail

  8. Exergy analysis of a combined heat and power plant with integrated lignocellulosic ethanol production

    International Nuclear Information System (INIS)

    Lythcke-Jørgensen, Christoffer; Haglind, Fredrik; Clausen, Lasse R.

    2014-01-01

    Highlights: • We model a system where lignocellulosic ethanol production is integrated with a combined heat and power (CHP) plant. • We conduct an exergy analysis for the ethanol production in six different system operation points. • Integrated operation, district heating (DH) production and low CHP loads all increase the exergy efficiency. • Separate operation has the largest negative impact on the exergy efficiency. • Operation is found to have a significant impact on the exergy efficiency of the ethanol production. - Abstract: Lignocellulosic ethanol production is often assumed integrated in polygeneration systems because of its energy intensive nature. The objective of this study is to investigate potential irreversibilities from such integration, and what impact it has on the efficiency of the integrated ethanol production. An exergy analysis is carried out for a modelled polygeneration system in which lignocellulosic ethanol production based on hydrothermal pretreatment is integrated in an existing combined heat and power (CHP) plant. The ethanol facility is driven by steam extracted from the CHP unit when feasible, and a gas boiler is used as back-up when integration is not possible. The system was evaluated according to six operation points that alternate on the following three different operation parameters: Load in the CHP unit, integrated versus separate operation, and inclusion of district heating production in the ethanol facility. The calculated standard exergy efficiency of the ethanol facility varied from 0.564 to 0.855, of which the highest was obtained for integrated operation at reduced CHP load and full district heating production in the ethanol facility, and the lowest for separate operation with zero district heating production in the ethanol facility. The results suggest that the efficiency of integrating lignocellulosic ethanol production in CHP plants is highly dependent on operation, and it is therefore suggested that the

  9. Integration of refrigerators into facility automation with the aid of bus systems; Integration der Kaeltetechnik in die Gebaeudeautomation mit Bus-Systemen

    Energy Technology Data Exchange (ETDEWEB)

    Baumgarth, S.; Heiser, M. [Fachhochschule Braunschweig-Wolfenbuettel, Wolfenbuettel (DE). Inst. fuer Verbrennungstechnik und Prozessautomation (IVP)

    2000-07-01

    The integration of refrigeration systems in building automation is illustrated by the example of a ventilation system and a cooling ceiling. Cold is supplied by a coldwater unit. This necessitates supply of consumption data to the central refrigeration system. So far, technical facilities are commonly controlled by DDC systems and in-house bus systems. The demand for open communication between different systems resulted in the development of neutral systems like FND and Profibus, which were followed by a multitude of other, less generally accepted systems. In the field of electrical installations, the European Installation Bus EIB was generally accepted as a certified, open bus system which can be combined with DDC technology and integrated in in-house control systems. Another technology developed in the USA is the Local Operating Network, LON, whic has a hither transmission rate and higher information content for the various bus members. The contribution compares the two bus systems. [German] Die Einbindung der Kaeltetechnik in die Gebaeudeautomation wird an den Beispielen Lueftungsanlage und Kuehldecke vorgestellt. Die erforderliche Kaelte soll durch einen Kaltwasserersatz energieoptimiert bereitgestellt werden. Dazu muessen Informationen aus dem Verbraucherbereich in der Kaeltezentrale zur Verfuegung stehen. RTL-Anlagen wurden bisher mittels DDC-Technik und firmenspezifischen Bus-Systemen geregelt und gesteuert. Wenn verschiedene Anlagen durch DDC-Systeme unterschiedlicher Hersteller betrieben wurden, so war anfaenglich eine gemeinsame Ueberwachung auf einer zentralen Leitwarte nur ueber Gateways moeglich. Aus der Forderung nach offener Kommunikation unterschiedlicher Systeme entstanden die ersten firmenneutralen Entwicklungen FND und Profibus. Es folgten eine Vielzahl weiterer Netz- und Busdefinitionen und deren Kommunikationsprotokolle, denen jedoch weitgehend eine allgemeine Anerkennung versagt blieb. Im Bereich der Elektroinstallation profilierte sich der

  10. Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

  11. Investigation of primary-to-secondary leakage accident on the PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Lipatov, I.A.; Dremin, G.I.; Galtchanskaya, S.A.; Chmal, I.I.; Moloshnikov, A.S.; Gorbunov, Y.S.; Antonova, A.I. [Electrogorsk Research and Engineering Center, EREC, Moscow (Russian Federation); Elkin, I.V. [RRC ' ' Kurchatov Institute, Moscow (Russian Federation)

    2001-07-01

    The full text follows. The paper presents the main results from the test on primary-to-secondary leakage of 100 mm in equivalent diameter. The test was performed on the PSB-VVER integral test facility. PSB-VVER is a 4-loops scaled down model of primary system of NPP with VVER-1000 Russian type reactor. Volume - power scale is about 1/300 while elevation scale is 1/1. All components of the primary system of the reference NPP are modeled on PSB-VVER. Both passive (accumulators) and active (high and low pressure) ECCSs, pressurizer spray and relief circuits, feed water system and atmospheric dumping system (ADS) as well as the primary circuit gas remove emergency system are also simulated. The primary-to-secondary leakage was simulated using an external break line which connects the upper part of the hot header to SG water volume. The break line included a break nozzle (a cylindrical channel d = 5.8 mm, l/d = 10 with sharp inlet edge), quick-acting valve and two-phase mass flow rate measurement system. In addition loss of off-site power at the moment when a scram-signal is generated was assumed in the experiment. Thus the accident is to be considered as a beyond-design-basic one. The loss of off-site power results in the following: -main circulation pump shutdown; -pressurizer heaters switching off; -HPIS water cooling flow rate and number of points of water injection are reduced The study focuses on the adequacy of the associated accident management (AM) procedure developed by EDO ''GIDROPRESS'' as a General Designer of VVER-type reactors. The AM-procedure was adopted to the PSB-VVER test facility conditions using CATHARE (France) and DINAMIKA (Russia) codes analysis. The AM-procedure in PSB-VVER is as follows: after about 30 min of the onset of the accident, when the accident type and the localization of the SG affected become evident for the operator, he closes all the main steam isolation valves, inhibits the ADS actuation in the affected SG

  12. Control system integration

    CERN Document Server

    Shea, T J

    2008-01-01

    This lecture begins with a definition of an accelerator control system, and then reviews the control system architectures that have been deployed at the larger accelerator facilities. This discussion naturally leads to identification of the major subsystems and their interfaces. We shall explore general strategies for integrating intelligent devices and signal processing subsystems based on gate arrays and programmable DSPs. The following topics will also be covered: physical packaging; timing and synchronization; local and global communication technologies; interfacing to machine protection systems; remote debugging; configuration management and source code control; and integration of commercial software tools. Several practical realizations will be presented.

  13. Evaluating building performance in healthcare facilities: an organizational perspective.

    Science.gov (United States)

    Steinke, Claudia; Webster, Lynn; Fontaine, Marie

    2010-01-01

    Using the environment as a strategic tool is one of the most cost-effective and enduring approaches for improving public health; however, it is one that requires multiple perspectives. The purpose of this article is to highlight an innovative methodology that has been developed for conducting comprehensive performance evaluations in public sector health facilities in Canada. The building performance evaluation methodology described in this paper is a government initiative. The project team developed a comprehensive building evaluation process for all new capital health projects that would respond to the aforementioned need for stakeholders to be more accountable and to better integrate the larger organizational strategy of facilities. The Balanced Scorecard, which is a multiparadigmatic, performance-based business framework, serves as the underlying theoretical framework for this initiative. It was applied in the development of the conceptual model entitled the Building Performance Evaluation Scorecard, which provides the following benefits: (1) It illustrates a process to link facilities more effectively to the overall mission and goals of an organization; (2) It is both a measurement and a management system that has the ability to link regional facilities to measures of success and larger business goals; (3) It provides a standardized methodology that ensures consistency in assessing building performance; and (4) It is more comprehensive than traditional building evaluations. The methodology presented in this paper is both a measurement and management system that integrates the principles of evidence-based design with the practices of pre- and post-occupancy evaluation. It promotes accountability and continues throughout the life cycle of a project. The advantage of applying this framework is that it engages health organizations in clarifying a vision and strategy for their facilities and helps translate those strategies into action and measurable performance

  14. Coordination in International Manufacturing: The Role of Competitive Priorities and the Focus of Globally Dispersed Facilities

    Directory of Open Access Journals (Sweden)

    Ahmed Sayem

    2018-04-01

    Full Text Available In this era of globalization, network integration has received great attention, as it certainly has implications for the competitiveness in international manufacturing. A key issue in integration is to coordinate activities of dispersed facilities in a way to align the target of locating abroad and the priorities to be competitive. This study explores and clarifies the effect of competitive priority and focus of dispersed facilities on coordinating the activities in intra-firm network manufacturing. Based on a multiple case study involving four different companies manufacturing in globally dispersed facilities, the results confirm that both competitive priorities and specific focus of global manufacturing are important for selecting mechanisms to coordinate overseas facilities, with the competitive priorities ‘quality’ and ‘flexibility’ being the more important. Furthermore, the findings reveal that companies place emphasis on informal mechanisms to coordinate the low-cost focused facilities. In turn, the importance of formal mechanisms seems equal for coordinating both low-cost focused facilities and those focused on capturing a local market. Finally, the findings of this paper suggest that elements of competitive priority, as well as the focus of dispersed facilities, should be considered towards making the choice for mechanisms of coordination. The findings bear important implications for the effective coordination of activities in international manufacturing.

  15. Integrated approach to oral health in aged care facilities using oral health practitioners and teledentistry in rural Queensland.

    Science.gov (United States)

    Tynan, Anna; Deeth, Lisa; McKenzie, Debra; Bourke, Carolyn; Stenhouse, Shayne; Pitt, Jacinta; Linneman, Helen

    2018-04-16

    Residents of residential aged care facilities are at very high risk of developing complex oral diseases and dental problems. Key barriers exist in delivering oral health services to residential aged care facilities, particularly in regional and rural areas. A quality improvement study incorporating pre- and post chart audits and pre- and post consultation with key stakeholders, including staff and residents, expert opinion on cost estimates and field notes were used. One regional and three rural residential aged care facilities situated in a non-metropolitan hospital and health service in Queensland. Number of appointments avoided at an oral health facility Feedback on program experience by staff and residents Compliance with oral health care plan implementation Observations of costs involved to deliver new service. The model developed incorporated a visit by an oral health therapist for screening, education, simple intervention and referral for a teledentistry session if required. Results showed an improvement in implementation of oral health care plans and a minimisation of need for residents to attend an oral health care facility. Potential financial and social cost savings for residents and the facilities were also noted. Screening via the oral health therapist and teledentistry appointment minimises the need for a visit to an oral health facility and subsequent disruption to residents in residential aged care facilities. © 2018 National Rural Health Alliance Ltd.

  16. Integrated safeguards and security for a highly automated process

    International Nuclear Information System (INIS)

    Zack, N.R.; Hunteman, W.J.; Jaeger, C.D.

    1993-01-01

    Before the cancellation of the New Production Reactor Programs for the production of tritium, the reactors and associated processing were being designed to contain some of the most highly automated and remote systems conceived for a Department of Energy facility. Integrating safety, security, materials control and accountability (MC and A), and process systems at the proposed facilities would enhance the overall information and protection-in-depth available. Remote, automated fuel handling and assembly/disassembly techniques would deny access to the nuclear materials while upholding ALARA principles but would also require the full integration of all data/information systems. Such systems would greatly enhance MC and A as well as facilitate materials tracking. Physical protection systems would be connected with materials control features to cross check activities and help detect and resolve anomalies. This paper will discuss the results of a study of the safeguards and security benefits achieved from a highly automated and integrated remote nuclear facility and the impacts that such systems have on safeguards and computer and information security

  17. Safeguards-by-Design: An Element of 3S Integration

    International Nuclear Information System (INIS)

    Bean, R.S.; Bjornard, T.A.; Hebdich, D.J.

    2009-01-01

    In 2008, the '20/20 Vision for the Future' background report by the IAEA Director General identified the possibility of integrating certain activities related to safeguards, safety, and security. Later in the year, the independent Commission report prepared at the request of the IAEA Director General noted that the Agency's's roles in nuclear safeguards, safety, and security (3S) complement and can mutually reinforce each other. Safeguards-by-design (SBD) is a practical measure that strengthens 3S integration, especially for the stage of nuclear facility design and construction, but also with ramifications for other stages of the facility life-cycle. This paper describes the SBD concept, with examples for diverse regulatory environments, being developed in the U.S under the U.S. Department of Energy (DOE) Next Generation Safeguards Initiative and the Advanced Fuel Cycle Initiative. This is compared with related international SBD work performed in the recent IAEA workshop on 'Facility Design and Plant Operation Features that Facilitate the Implementation of IAEA Safeguards'. Potential future directions for further development of SBD and its integration within 3S are identified.

  18. Concepts on integration of physical protection and material accounting functions in a safeguards system

    International Nuclear Information System (INIS)

    Reynolds, D.A.

    1981-01-01

    Concepts on integration of physical protection and material accounting systems to enhance overall safeguards capability are developed and presented. Integration is approached by coordinating all safeguards information through a safeguards coordination center. This center represents a higher level in a communication, data-processing, and decision-making structure which is needed for efficient real-time operation of the integrated system. The safeguards coordination center functions to assess alarm and warning data required to resolve threats in the safeguards system, coordinate information and interaction involving the material accounting, physical protection, and facility monitoring and control systems, and present a single unified interface for interaction with facility management, facility operations, safeguards system personnel, and response forces

  19. Preliminary design for a maglev development facility

    Energy Technology Data Exchange (ETDEWEB)

    Coffey, H.T.; He, J.L.; Chang, S.L.; Bouillard, J.X.; Chen, S.S.; Cai, Y.; Hoppie, L.O.; Lottes, S.A.; Rote, D.M. (Argonne National Lab., IL (United States)); Zhang, Z.Y. (Polytechnic Univ., Brooklyn, NY (United States)); Myers, G.; Cvercko, A. (Sterling Engineering, Westchester, IL (United States)); Williams, J.R. (Alfred Benesch and Co., Chicago, IL (United States))

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable of powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.

  20. How an integrated change programme has accelerated the reduction in high hazard nuclear facilities at Sellafield - 59014

    International Nuclear Information System (INIS)

    Mackintosh, Angela

    2012-01-01

    For over five decades the Sellafield Site has been central to the UK's nuclear programme. Sellafield Ltd is managed by NMP (Nuclear Management Partners), a consortium of URS, AMEC and AREVA and is focussed on the decommissioning of historical facilities. When the activity of Decommissioning commenced in the late 1980's the site focus at that time was on commercial reprocessing and waste management. Now through the implementation of an integrated company change programme, emphasis has shifted towards accelerated risk and hazard reduction of degraded legacy plants with nuclear inventory whilst ensuring value for money for the customer, the Nuclear Decommissioning Authority (NDA). This paper will describe the management approach that is being taken and the planning tools that are being applied by the Site owners in delivering an integrated change programme across the Decommissioning Directorate. The paper will explain how the management approach to change uses Peer Assist, Rapid Improvement Events, Organisational Review Self Evaluation, Value Stream Analysis and Accelerated Improvement Events as improvement tools. Use of these has enabled down-sizing of the organisation, driven out hundreds of man day efficiencies within the maintenance and asset management areas, improved the management of spares reducing annual costs by Pounds 1000's, improved Commercial practices by fast tracking the preparation of invitations to tender for critical contracts, rolled back radiological control areas and enabled quicker access to the work-face at a reduced cost. This paper will explain in detail how the Decommissioning Directorate Programme Office has implemented planning tools such as governance, identification of opportunities, benefit evaluation and prioritisation and sanction of the optimum improvements and how through the use of a balanced scorecard, delivery of the improvements has been measured ensuring that the targets are met. Finally, the paper will discuss how the