WorldWideScience

Sample records for integrated systems management

  1. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  2. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  3. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  4. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  5. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  6. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  7. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  8. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  9. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  10. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  11. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  12. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  13. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  14. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  15. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  16. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  17. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  18. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  19. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  20. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  1. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  2. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  3. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  4. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  5. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  6. Basic principles, contents, and benefits of an integrated management system

    International Nuclear Information System (INIS)

    Schwarzin, Juergen

    2010-01-01

    The basic principles and contents of an integrated management system are presented. The report focuses on the benefits and the experience accumulated in using an integrated management system. Integrated management systems are characterized by 2 features in particular: - On the one hand, by a system holistically controlling and describing all processes within a company which are necessary to achieve the company policy and company goals as defined. - On the other hand, it combines in one integrated management system various different aspects (such as quality, environmental protection, and safety) and the resulting requirements. Successful implementation of an integrated management system requires a clear commitment by company management to the integrated management system serving as a management tool. Implementation must be assigned the appropriate importance in the company. It must not be viewed as an instrument preserving 'status quo.' Instead, it must be seen as a tool for long-term improvement of the company. Application of the integrated management system minimizes the probability of occurrence of events, but is not able to reduce it to zero. (orig.)

  7. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  8. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  9. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  10. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  11. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  12. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  13. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  14. Development and improvement of the integrated system of management

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa Galeevna

    2014-07-01

    Full Text Available Integrated management system construction can be considered a way that transforms using business processes and information resources into final construction products. Autonomous system of quality management, environmental, health and safety organizations introduction usually lead to the accumulation of duplicate documents, which increase the time spent on processing and analysis as well as increase the financial costs of maintaining the operation of each of them separately. System integration allows reducing these costs and entailing the most obvious benefits: reduced volumes of documents; reduction of time spent on analysis; reducing the cost of audit and certification; involvement of all the employees of the organization; productivity growth; increasing the attractiveness for consumers; reducing the burden on administrative and executive devices; ensuring a high level of flexibility in the organization's management system in case of internal and external changes. Integration of quality management systems, environmental management and safety management systems, production and safety led to the possibility to establish such integrated management system in developing building companies, which allows establishing a unified management system, as an element of management of organization. The main drawback of the currently used standards and specifications is the lack of flexibility of their application, as well as the basic principles and approaches to their implementation. Thus, knowing about what the system should be, but not knowing how to create it, many organizations have to operate without methodological support. Absence of mandatory standards concerning integration of management systems creates opportunities for the existence of multiple options for interaction systems. Economic effects on the integrated management system is formed from three sources: the reduction of production costs by improving product quality and reducing defects and

  15. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  16. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  17. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  18. Application of contemporary integrated manufacture systems to nuclear power plants management

    International Nuclear Information System (INIS)

    Zhou Gang; Wang Lushuai; Tang Yaoyang

    2005-01-01

    In order to improve the safety, economy and reliability of the operation of a nuclear power plant (NPP), a novel integrated management method is proposed based on the 'integration' concept of the computer and contemporary integrated manufacture systems (CIMS). The design of integrated management system for NPP is studied. In the design of this system, information integration method based on the database and product data management (PDM) technology is adopted. In order to design and integrated management system satisfying the needs of NPP management, all activities of NPP are divided into different categories according to its characteristics. There are subsystems under the general management system to conduct the management work of different categories. All subsystems are interrelated in the environment of CIMS, but relatively independent. The application of CIMS to NPP provides a new way for scientific management of NPP, and makes the best of human, material and information resources. (authors)

  19. Integration of Standardized Management Systems: A Dilemma?

    Directory of Open Access Journals (Sweden)

    Manuel Ferreira Rebelo

    2015-06-01

    Full Text Available The growing proliferation of management systems standards (MSSs, and their individualized implementation, is a real problem faced by organizations. On the other hand, MSSs are aimed at improving efficiency and effectiveness of organizational responses in order to satisfy the requirements, needs and expectations of the stakeholders. Each organization has its own identity and this is an issue that cannot be neglected; hence, two possible approaches can be attended. First, continue with the implementation of individualized management systems (MSs; or, integrate the several MSSs versus related MSs into an integrated management system (IMS. Therefore, in this context, organizations are faced with a dilemma, as a result of the increasing proliferation and diversity of MSSs. This paper takes into account the knowledge gained through a case study conducted in the context of a Portuguese company and unveils some of the advantages and disadvantages of integration. A methodology is also proposed and presented to support organizations in developing and structuring the integration process of their individualized MSs, and consequently minimize problems that are generators of inefficiencies, value destruction and loss of competitiveness. The obtained results provide relevant information that can support Top Management decision in solving that dilemma and consequently promote a successful integration, including a better control of business risks associated to MSSs requirements and enhancing sustainable performance, considering the context in which organizations operate.

  20. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  1. Integration of electronic document management system with other systems in a company

    OpenAIRE

    Pintar, Matej

    2016-01-01

    This master's thesis presents specific model of integration between electronic document management system and other systems in a medium-sized company in Slovenia. The introduction part of the thesis begins with theoretical basis of the research, which is the integration of computer systems. The introduction part is folowed by presentation of a concrete electronic document management system EBA DMS. Central part of the master's thesis presents different methods of integration of electronic doc...

  2. Integrated, regional approach to risk management of industrial systems

    International Nuclear Information System (INIS)

    Chakraborty, S.

    1992-01-01

    This paper focuses on the following four main issues: (1) necessity for an integrated, regional approach to risk management of industrial systems; (2) principles of risk management; (3) integrated approach and overall methodology; and (4) implementation of risk management strategies on a regional basis. The U.N. Interagency project on risk management for large industrial areas, which is a pioneer type of international initiative for an integrated approach to risk management, is discussed in this context. Another encouraging activity for further development of overall methodologies for risk management is the ongoing project on the risk and safety of technical systems at the Swiss Federal Institute of Technology in Aurich. The concept of integral risk management takes into account multidimensional factors including technical, economic, political, social, and ethical considerations to allow a well-balanced decision-making process

  3. QUANTITATIVE СHARACTERISTICS OF COMPLEMENTARY INTEGRATED HEALTH CARE SYSTEM AND INTEGRATED MEDICATION MANAGEMENT INFORMATION SYSTEM

    Directory of Open Access Journals (Sweden)

    L. Yu. Babintseva

    2015-05-01

    i mportant elements of state regulation of the pharmaceutical sector health. For the first time creation of two information systems: integrated medication management infor mation system and integrated health care system in an integrated medical infor mation area, operating based on th e principle of complementarity was justified. Global and technological coefficients of these systems’ functioning were introduced.

  4. Continuous improvement of the BNFL transport integrated management system

    International Nuclear Information System (INIS)

    Hale, J.A.

    1998-01-01

    The integrated Management System of BNFL Transport and Pacific Nuclear Transport Limited (PNTL) is subject to continuous improvement by the application of established improvement techniques adopted by BNFL. The technique currently being used is the application of a Total Quality Management (TQM) philosophy, involving the identification of key processes, benchmarking against existing measures, initiating various improvement projects and applying process changes within the Company. The measurement technique being used is based upon the European Foundation for Quality Management Model (EFQM). A major initiative was started in 1996 to include the requirements of the Environmental Management Systems standard ISO 14001 within the existing integrated management system. This resulted in additional activities added to the system, modification to some existing activities and additional training for personnel. The system was audited by a third party certification organisation, Lloyds Register Quality Assurance (LRQA), during 1997. This paper describes the arrangements to review and update the integrated management system of BNFL Transport and PNTL to include the requirements of the environmental standard ISO 14001 and it also discusses the continuous improvement process adopted by BNFL Transport. (authors)

  5. INTEGRATED SAFETY MANAGEMENT SYSTEM IN AIR TRAFFIC SERVICES

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-06-01

    Full Text Available The article deals with the analysis of the researches conducted in the field of safety management systems.Safety management system framework, methods and tools for safety analysis in Air Traffic Control have been reviewed.Principles of development of Integrated safety management system in Air Traffic Services have been proposed.

  6. Disaster Management: AN Integral Part of Science & Technology System and Land Administration-Management System

    Science.gov (United States)

    Ghawana, T.; Zlatanova, S.

    2016-06-01

    Disaster management is a multidisciplinary field, which requires a general coordination approach as well as specialist approaches. Science and Technology system of a country allows to create policies and execution of technical inputs required which provide services for the specific types of disasters management. Land administration and management agencies, as the administrative and management bodies, focus more on the coordination of designated tasks to various agencies responsible for their dedicated roles. They get help from Scientific and technical inputs & policies which require to be implemented in a professional manner. The paper provides an example of such integration from India where these two systems complement each other with their dedicated services. Delhi, the Capital of India, has such a disaster management system which has lot of technical departments of government which are mandated to provide their services as Emergency Service Functionaries. Thus, it is shown that disaster management is a job which is an integral part of Science & Technology system of a country while being implemented primarily with the help of land administration and management agencies. It is required that new policies or mandates for the Science and technology organizations of government should give a primary space to disaster management

  7. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  8. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  9. Management systems for high reliability organizations. Integration and effectiveness; Managementsysteme fuer Hochzuverlaessigkeitsorganisationen. Integration und Wirksamkeit

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Michael

    2015-03-09

    The scope of the thesis is the development of a method for improvement of efficient integrated management systems for high reliability organizations (HRO). A comprehensive analysis of severe accident prevention is performed. Severe accident management, mitigation measures and business continuity management are not included. High reliability organizations are complex and potentially dynamic organization forms that can be inherently dangerous like nuclear power plants, offshore platforms, chemical facilities, large ships or large aircrafts. A recursive generic management system model (RGM) was development based on the following factors: systemic and cybernetic Asepcts; integration of different management fields, high decision quality, integration of efficient methods of safety and risk analysis, integration of human reliability aspects, effectiveness evaluation and improvement.

  10. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    Science.gov (United States)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  11. SELECTED REQUIREMENTS OF INTEGRATED MANAGEMENT SYSTEMS BASED ON PAS 99 SPECIFICATION

    Directory of Open Access Journals (Sweden)

    Paweł Nowicki

    2013-03-01

    Full Text Available The aim this research was to analyze the ways of integration of management systems in food sector. The study involved the documentation, audits, corrective and preventive actions and management's review phases described in the specification PAS 99, which is one of common elements of integrated management systems. Four organizations were selected for the study. The organizations had introduced and certified at least two standardized management systems. It was assumed that the investigated organizations should have implemented the HACCP system. Studies were conducted as a case study. The employees responsible for the functioning of management systems were interviewed in all four organizations. The study was conducted in the form of in-depth interviews based on pre-prepared script. The scenario was developed based on the PAS 99 guideline. The process of integration of management systems implemented in the studied companies reveals the full compliance of an integrated management system with PASS 99 in the policy area.

  12. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  13. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  14. Energy Production System Management - Renewable energy power supply integration with Building Automation System

    International Nuclear Information System (INIS)

    Figueiredo, Joao; Martins, Joao

    2010-01-01

    Intelligent buildings, historically and technologically, refers to the integration of four distinctive systems: Building Automation Systems (BAS), Telecommunication Systems, Office Automation Systems and Computer Building Management Systems. The increasing sophisticated BAS has become the 'heart and soul' of modern intelligent buildings. Integrating energy supply and demand elements - often known as Demand-Side Management (DSM) - has became an important energy efficiency policy concept. Nowadays, European countries have diversified their power supplies, reducing the dependence on OPEC, and developing a broader mix of energy sources maximizing the use of renewable energy domestic sources. In this way it makes sense to include a fifth system into the intelligent building group: Energy Production System Management (EPSM). This paper presents a Building Automation System where the Demand-Side Management is fully integrated with the building's Energy Production System, which incorporates a complete set of renewable energy production and storage systems.

  15. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  16. Understanding Organizational Memory from the Integrated Management Systems (ERP)

    OpenAIRE

    Gilberto Perez; Isabel Ramos

    2013-01-01

    With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP), we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP) we tried to draw a parallel between ...

  17. Auditing supports the integration of management systems in the nuclear industry

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2004-01-01

    Integration of function-specific management systems in organizations is rapidly becoming a topic of interest for managers and auditors alike. This is mainly due to the proliferation of management system standards that foster compliance with the stated criteria for quality, environmental, occupational health and safety, social responsibility and other function-specific aspects of performance. While most of the available literature on this topic focuses on the integration of standards, there is comparatively little information available on how to actually build an integrated system internally. This paper hypothesizes that, besides using audits for the implementation of the available procedures, audits can provide an excellent basis for these integration efforts. Therefore the prerequisites, strategies and resources necessary for an effective audit in support of integrated management systems are discussed. The paper also describes how audits are used to improve a combined quality and safety management system at the repository of radioactive waste in Morsleben (Germany). (authors)

  18. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  19. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  20. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  1. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  2. Integrated software system for low level waste management

    International Nuclear Information System (INIS)

    Worku, G.

    1995-01-01

    In the continually changing and uncertain world of low level waste management, many generators in the US are faced with the prospect of having to store their waste on site for the indefinite future. This consequently increases the set of tasks performed by the generators in the areas of packaging, characterizing, classifying, screening (if a set of acceptance criteria applies), and managing the inventory for the duration of onsite storage. When disposal sites become available, it is expected that the work will require re-evaluating the waste packages, including possible re-processing, re-packaging, or re-classifying in preparation for shipment for disposal under the regulatory requirements of the time. In this day and age, when there is wide use of computers and computer literacy is at high levels, an important waste management tool would be an integrated software system that aids waste management personnel in conducting these tasks quickly and accurately. It has become evident that such an integrated radwaste management software system offers great benefits to radwaste generators both in the US and other countries. This paper discusses one such approach to integrated radwaste management utilizing some globally accepted radiological assessment software applications

  3. SYSTEMS FOR IMPROVEMENT OF BUSINESS INTEGRATED MANAGEMENT PROCESSES IN PORTS

    Directory of Open Access Journals (Sweden)

    Pavle Popovic

    2017-03-01

    Full Text Available Based on test results obtained so far, the objective relating to modern scientific methods and approaches has been defined with the intention to develop model which defines new management system integration model, by adopting necessary practical terms of real systems that most frequently circulate in maritime practice in the field of integrated management systems (IMS in terms of safety and security of vessels and ports. The subject of research is maritime, particularly port services, by way of defining internal and external advantages through adopting integrated management systems. The research will be conducted through theoretical and applied assessments of case study analyses using example of the Port of Kotor H.Co.

  4. Integrated management system - management standards evolution and the IAEA new approach

    International Nuclear Information System (INIS)

    Oliveira, Dirceu Paulo de; Zouain, Desiree Moraes

    2007-01-01

    The management standards application began in military and nuclear areas towards the end of Second World War, when some westerns countries developed quality standards to improve their means to assess suppliers' conditions to assure their products conformance, which was increasingly complex and required a higher degree of reliability. Afterwards, the quality standards application was extended to the consumer market focused on consumers' requirements satisfaction. Coming along the society crescent concern about quality of life, other management standards were developed, such as those dealing with environmental and sustainable development, occupational health and safety, social accountability and so on. As a consequence, the management process became complex. The management system integrated form approach makes possible the compatibility of distinct and complementary interests from several functions and disciplines involved and supply the absence of the organizations' holistic approach. According to this integrated management approach, the Agency - 'International Atomic Energy Agency' (IAEA) - decided to review the structure of the 50-C-Q standard - 'Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Installations', from 1996, publishing in 2006 the new GS-R-3 standard - 'The Management System for Facilities and Activities - Safety Requirements'. This work presents a brief evolution of management standards and integrated management approach, showing the Agency's new vision concerning this issue with the GS-R-3 standard publication. (author)

  5. Design of the Hospital Integrated Information Management System Based on Cloud Platform.

    Science.gov (United States)

    Aijing, L; Jin, Y

    2015-12-01

    At present, the outdated information management style cannot meet the needs of hospital management, and has become the bottleneck of hospital's management and development. In order to improve the integrated management of information, hospitals have increased their investment in integrated information management systems. On account of the lack of reasonable and scientific design, some hospital integrated information management systems have common problems, such as unfriendly interface, poor portability and maintainability, low security and efficiency, lack of interactivity and information sharing. To solve the problem, this paper carries out the research and design of a hospital information management system based on cloud platform, which can realize the optimized integration of hospital information resources and save money.

  6. Integrated waste management system costs in a MPC system

    International Nuclear Information System (INIS)

    Supko, E.M.

    1995-01-01

    The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility

  7. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  8. The role of business information management in advanced integrated environmental management systems

    DEFF Research Database (Denmark)

    Ulhøi, John Parm

    2000-01-01

    investments in the individual company. Secondly, based on the above, to calculate and assess some typical quantifiable savings, e.g. on energy and raw materials, over a period of four years (after the implementation of the integrated environmental management system). In line with other similar investigations......, the study shows that the implementation of systematic and integrated environmental management systems results in significant savings. This supports the general, albeit rarely tested, hypothesis that it pays to be an environmentally responsible enterprise....

  9. Development of an Information Database for the Integrated Airline Management System (IAMS

    Directory of Open Access Journals (Sweden)

    Bogdane Ruta

    2017-08-01

    Full Text Available In present conditions the activity of any enterprise is represented as a combination of operational processes. Each of them corresponds to relevant airline management systems. Combining two or more management systems, it is possible to obtain an integrated management system. For the effective functioning of the integrated management system, an appropriate information system should be developed. This article proposes a model of such an information system.

  10. DOE-RL Integrated Safety Management System Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions

  11. DOE-RL Integrated Safety Management System Description

    CERN Document Server

    Shoop, D S

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  12. Integrated Services Management System (ISMS): A management and decision making tool

    Energy Technology Data Exchange (ETDEWEB)

    Barber, D.S.; Brockman, D.L.; Buxton, L.D. [and others

    1995-10-01

    This document provides information concerning the Integrated Services Management System (ISMS) that was developed for the Laboratories Services Division during the period February 1994 through May 1995. ISMS was developed as a formal method for centralized management of programs within the Division. With minor modifications, this system can be adapted for management of all overhead functions at SNL or for sector level program management. Included in this document are the reasons for the creation of this system as well as the resulting benefits. The ISMS consists of six interlinked processes; Issues Management, Task/Activity Planning, Work Decision, Commitment Management, Process/Project Management, and Performance Assessment. Those processes are described in detail within this document. Additionally, lessons learned and suggestions for future improvements are indicated.

  13. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  14. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  15. Integrated Management System - Scope, Possibilities And Methodology

    Science.gov (United States)

    Čekanová, Katarína

    2015-06-01

    Organizations are becoming more aware of the importance of integrated management systems (IMS). Interest in this subject indicates that IMS are seen as "management systems of the future". Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  16. Integrated management systems: survey results from Portuguese companies and experts

    OpenAIRE

    Domingues, Pedro; Sampaio, Paulo; Arezes, P.

    2012-01-01

    The proliferation of several certifiable sub-systems among different type of organizations lead companies to excessive departmentalization. This fact turned out to be, due to several reasons pointed out by numerous authors, disadvantageous. Hence, organizations optioned by integration of their management sub-systems. Academic awareness to this sociological event is mainly related with the fact of integration of management systems (IMS) had been performed empirically, that is, by each organiza...

  17. Corporate Motivation for Integrated Management System Implementation, Why do Firms Engage in Integration of Management Systems: A Literature Review & Research Agenda

    NARCIS (Netherlands)

    Asif, M.; Asif, M.; de Bruijn, E.J.; Fisscher, O.A.M.

    2008-01-01

    Integration of management systems such as for quality, environment, occupational health and safety, risk management, and corporate social responsibilities is a viable organisational approach to cost reduction, efficient utilization of resources, greater motivation of employees, and better compliance

  18. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  19. Design of an integrated information management system for safe management of radioactive waste

    International Nuclear Information System (INIS)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il

    2003-05-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as: the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal

  20. Design of an integrated information management system for safe management of radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)] (and others)

    2003-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as: the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal.

  1. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  2. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  3. An integrated management system to improve the performance of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Beckmerhagen, I.A.; Berg, H.P. [Bundesamt fur Strahlenschutz, Salzgitter (Germany)

    2001-07-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  4. An integrated management system to improve the performance of nuclear installations

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2001-01-01

    A integrated management system encompasses all management and assessment activities. The integration of DM, QM, safety management and occupational health into an integrated management system is shown for structures, systems and components of waste repositories because they have to fulfill reliability requirements derived from comprehensive safety assessments, and these structures, systems and components (such as transport vehicles and stacker trucks for the underground emplacement activities) are especially manufactured for this purpose and are not series products. QM institutes a QM system which ensures that there are clearly defined and auditable procedures. The requirements are written down in specifications or operation manuals and/or maintenance manuals. The QM system provides assurance that the installed structures, systems or components meet and continue to meet the prescribed goals with the help of DM and that safety management and occupational health specified requirements are fulfilled. DM focuses on the use of engineering analyses, assessments and methods to improve the design, specification, construction, dependability and operation of important systems, structures and components. (author)

  5. Research on Integration of NPP Operational Safety Management Performance Systems

    International Nuclear Information System (INIS)

    Chi, Miao; Shi, Liping

    2014-01-01

    The operational safety management of Nuclear Power Plants demands systematic planning and integrated control. NPPs are following the well-developed safety indicator systems proposed by IAEA Operational Safety Performance Indicator Programme, NRC Reactor Oversight Process or the other institutions. Integration of the systems is proposed to benefiting from the advantages of both systems and avoiding improper application into the real world. The authors analyzed the possibility and necessity for system integration, and propose an indicator system integrating method

  6. Nuclear power plant Angra integrated enterprise management system

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2009-01-01

    The characteristics and peculiarities of the Nuclear Power Plant ANGRA 3 enterprise, amongst which its technical complexity, the size of the project and of the supplies of goods and services contracted for for the Brazilian and foreign scopes, the variety of contractors and participants involved in the implementation, associated with the need of integrated management of all the activities of the enterprise, requires the setting of standardized criteria and procedures to be adopted by the enterprise Project Management Team and by all involved ELETRONUCLEAR (ETN) Units, Suppliers and Contractors for Brazilian and foreign goods and services for the execution of the activities related to overall enterprise planning. These criteria and procedures aim at covering the five Project Management Process Groups: Initiating Process Group, Planning Process Group, Execution Process Group, Monitoring and Controlling Process Group and Closing Process Group. For the ANGRA 3 enterprise, ETN developed the Integrated Enterprise Management System - INTEGRA, being the software 'Primavera Enterprise Project Management' a fundamental part of this system. The aim of this paper is to describe the main concepts involving the ANGRA 3 enterprise management, and the integration between the processes, including all disciplines in all phases of the enterprise life cycle, such as: Nuclear and Environmental Licensing, Infrastructure, National and Foreign Engineering, National and Import Supplies, Civil Works, Electromechanical Erection, Commissioning. (author)

  7. The Design of Integrated Logistics Management System of an Industrial Company

    Directory of Open Access Journals (Sweden)

    Hart Martin

    2017-01-01

    Full Text Available In the contemporary global business markets environment, when the business markets are getting more and more commercial, there are growing demand for effective management of material flows. The effectivity and effectiveness of planning, management and control the material flows across an industrial company and its distribution networks, represents one of the main pillar regarding the high level of competitive advantage within the frame of supply chains. Thus, the company information management system design should have also included a module of integrated logistics management system to ensure required level of material flow management effectivity and effectiveness. The article deals with brief description of the issues on company management, company information management systems and logistics management. Further it’s stated the methodology to created integrated logistics management system, which is containing the methodics to design logistics management sub-systems of purchasing, manufacturing, distribution and reverse material flows. The essential methodics of the stated methodology is the methodics to create independent demand forecasting sub-system.

  8. Plant Reliability - an Integrated System for Management (PR-ISM)

    International Nuclear Information System (INIS)

    Aukeman, M.C.; Leininger, E.G.; Carr, P.

    1984-01-01

    The Toledo Edison Company, located in Toledo, Ohio, United States of America, recently implemented a comprehensive maintenance management information system for the Davis-Besse Nuclear Power Station. The system is called PR-ISM, meaning Plant Reliability - An Integrated System for Management. PR-ISM provides the tools needed by station management to effectively plan and control maintenance and other plant activities. The PR-ISM system as it exists today consists of four integrated computer applications: equipment data base maintenance, maintenance work order control, administrative activity tracking, and technical specification compliance. PR-ISM is designed as an integrated on-line system and incorporates strong human factors features. PR-ISM provides each responsible person information to do his job on a daily basis and to look ahead towards future events. It goes beyond 'after the fact' reporting. In this respect, PR-ISM is an 'interactive' control system which: captures work requirements and commitments as they are identified, provides accurate and up-to-date status immediately to those who need it, simplifies paperwork and reduces the associated time delays, provides the information base for work management and reliability analysis, and improves productivity by replacing clerical tasks and consolidating maintenance activities. The functional and technical features of PR-ISM, the experience of Toledo Edison during the first year of operation, and the factors which led to the success of the development project are highlighted. (author)

  9. Research on integrated managing system based on CIMS for nuclear power plant safety

    International Nuclear Information System (INIS)

    Zhou Gang

    2006-01-01

    In order to improve safety, economy and reliability of operation for nuclear power plant (NPP), a novel integrated managing method was proposed based on the ideas of computer and contemporary integrated manufacturing system (CIMS). The application of CIMS to nuclear power plant safety management was researched. In order to design an integrated managing system to meet the needs of NPP safety management, all work related to nuclear safety is divided into different category according to its characters. On basis of this work, general integrated managing system was designed at first. Then subsystems were designed and every subsystem implements a category of nuclear safety management work. All subsystems are independent relatively on the one hand and are interrelated on other hand by global information system. (authors)

  10. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  11. Development of SFR Research and Integration Management System (S-RIMS)

    International Nuclear Information System (INIS)

    Cho, Chung Ho; Chang, Jin Wook; Kim, Young Gyun; Kim, Yeong Il

    2011-01-01

    Up to the present, the management of research and development (R and D) for a sodium cooled fast reactor (SFR) could be individually performed on each project without an organic relationship. However, a more systemic and effective integrated management of a project is required because the research and development environment is currently changing. Thus, we developed a Research and Integration Management System for SFR (S-RIMS) based on the enterprise project management (EPM) solution. The functional goals of the S-RIMS are as follows: 1. Provide data that show the progress and status of a project 2. Manage the design process and R and D products 3. Share the consistent design data between sub-projects

  12. Systems engineering applied to integrated safety management for high consequence facilities

    International Nuclear Information System (INIS)

    Barter, R; Morais, B.

    1998-01-01

    Integrated Safety Management is a concept that is being actively promoted by the U.S. Department of Energy as a means of assuring safe operation of its facilities. The concept involves the integration of safety precepts into work planning rather than adjusting for safe operations after defining the work activity. The system engineering techniques used to design an integrated safety management system for a high consequence research facility are described. An example is given to show how the concepts evolved with the system design

  13. PGPB's pipeline integrity management system

    Energy Technology Data Exchange (ETDEWEB)

    Urencio, Claudio; Sanchez, Luis; Moreno, Carlos [PGPB - Pemex Gas y Petroquimica Basica (Mexico)

    2005-07-01

    Pemex Gas has 12,134 km of natural gas transmission pipelines, 1,835 Km for LPG and 1,216 Km for basic petrochemicals. The must part of this infrastructure was built in the 70's and reaching their 35 years of operating life. To manage the integrity of the three systems, Pemex Gas has a portfolio of technological tools. This tools allow the Company to improves the decision taking, align the budget with their strategic goals, achieve efficient asset utilization, and increase the value generation. The process of integrity management starts with the risk evaluation on assets, with the use of a software called IAP (Integrity Assessment Program). This information is integrated to the SIIA (Assets Identification System). The results of both software are used to the construction of the Risk Atlas, which identifies graphically each pipeline segment, with their related risk and factors that influence their behavior. The Risk Atlas gives us information about the consequences to the people, environment and facilities, so we can design customized plans to prevent or mitigate emergencies. Finally a detailed analysis of the resulting information and scenarios simulations help us to determine the best investment projects that will minimize the risk through all our assets. (author)

  14. Case Mix Management Systems: An Opportunity to Integrate Medical Records and Financial Management System Data Bases

    Science.gov (United States)

    Rusnak, James E.

    1987-01-01

    Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The hospital must insure the CMMS project provides a means to implement an integrated on-line hospital information data base for use by departments in operating under a DRG-based Prospective Payment System. This paper presents guidelines for use in selecting a Case Mix Mangement System to meet the hospital's financial and operations planning, budgeting, marketing, and other management needs, while considering the data base implications of the implementation.

  15. Integrated System Health Management: Foundational Concepts, Approach, and Implementation.

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John; Walker, Mark; Venkatesh, Meera; Kapadia, Ravi; Morris, Jon; Turowski, Mark; Smith, Harvey

    2009-01-01

    Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. We present concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a system. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: 1. ISHM Model of a system 2. Detection of anomaly indicators. 3. Determination and confirmation of anomalies. 4. Diagnostic of causes and determination of effects. 5. Consistency checking cycle. 6. Management of health information 7. User Interfaces 8. Example implementation ISHM has been defined from many perspectives. We define it as a capability that might be achieved by various approaches. We describe a specific approach that has been matured throughout many years of development, and pilot implementations. ISHM is a capability that is achieved by integrating data, information, and knowledge (DIaK) that might be distributed throughout the system elements (which inherently implies capability to manage DIaK associated with distributed sub-systems). DIaK must be available to any element of a system at the right time and in accordance with a meaningful context. ISHM Functional Capability Level (FCL) is measured by how well a system performs the following

  16. Diablo Canyon plant information management system and integrated communication system

    International Nuclear Information System (INIS)

    Stanley, J.W.; Groff, C.

    1990-01-01

    The implementation of a comprehensive maintenance system called the plant information management system (PIMS) at the Diablo Canyon plant, together with its associated integrated communication system (ICS), is widely regarded as the most comprehensive undertaking of its kind in the nuclear industry. This paper provides an overview of the program at Diablo Canyon, an evaluation of system benefits, and highlights the future course of PIMS

  17. Diablo Canyon plant information management system and integrated communication system

    Energy Technology Data Exchange (ETDEWEB)

    Stanley, J.W.; Groff, C.

    1990-06-01

    The implementation of a comprehensive maintenance system called the plant information management system (PIMS) at the Diablo Canyon plant, together with its associated integrated communication system (ICS), is widely regarded as the most comprehensive undertaking of its kind in the nuclear industry. This paper provides an overview of the program at Diablo Canyon, an evaluation of system benefits, and highlights the future course of PIMS.

  18. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  19. Integrated management systems. Advantages and disadvantages; difficulties and recommendations in the process of implementation

    Directory of Open Access Journals (Sweden)

    Aneta Wysokińska-Senkus

    2011-01-01

    Full Text Available Nowadays, organisations are constantly looking for methods to improve their efficiency and to guarantee them a competitive advantage, sustainable profitable growth and ability to survive in a turbulent environment. An increasing popularity of implementation of certified management systems has been noticed. The most often integrated management system are eg. ISO 9001, ISO 14001, ISO 18001. The paper presents the conditions for the implementation of an integrated management system (IMS, the characteristics of the most integrated management systems, the advantages and disadvantages of integration and the difficulties in the implementation of IMS and recommendations regarding the effectiveness of the integration of IMS.

  20. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  1. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  2. Practical applications approach to design, development and implementation of an integrated management system

    International Nuclear Information System (INIS)

    Holdsworth, Rodger

    2003-01-01

    The introduction of quality, risk, safety, health and environmental management philosophies has significantly changed industry's view of company organization and controlling processes. Quality, risk, safety, health and environmental programs and systems, such as ISO 9000, ISO 14000, process safety, and risk management are impacting the way industry will meet the challenges of safety and environmental risks and the needs of the customer in the future. A wealth of knowledge has been extracted from practical application case studies, which would otherwise be unobtainable without years of experience related to management systems design, development, implementation and control. This paper discusses a practical applications approach to design, develop and implement an integrated management system encompassing quality (ISO 9000), process safety management (CFR 29 1910.119), risk management programs (CFR 40 part 68), environmental management (ISO 14000), and safety and health. This paper includes a discussion of management systems integration and an overview of management systems standards that apply to the petrochemical and chemical manufacturers industries. The paper also provides an overview on integrating management systems, including issues related to the following topics: - Establishing a management system team and objectives. - Assessing and knowing your organization. - Designing the management system to meet site objectives. - Developing system documentation. - Implementing effective management systems. - Measuring program performance. - Continuous improvement

  3. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  4. In-flight Integrated Mission Management System (I-LIMMS)

    National Research Council Canada - National Science Library

    Emmitt, George D; Greco, Steven; Wood, Sidney

    2006-01-01

    The goal of this Phase I SBIR effort was to determine the feasibility and preliminary design of I-LIMMS, an In-flight Lidar Integrated Mission Management System for the processing and visualization...

  5. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  6. Intelligent Integrated Health Management for a System of Systems

    Science.gov (United States)

    Smith, Harvey; Schmalzel, John; Figueroa, Fernando

    2008-01-01

    An intelligent integrated health management system (IIHMS) incorporates major improvements over prior such systems. The particular IIHMS is implemented for any system defined as a hierarchical distributed network of intelligent elements (HDNIE), comprising primarily: (1) an architecture (Figure 1), (2) intelligent elements, (3) a conceptual framework and taxonomy (Figure 2), and (4) and ontology that defines standards and protocols. Some definitions of terms are prerequisite to a further brief description of this innovation: A system-of-systems (SoS) is an engineering system that comprises multiple subsystems (e.g., a system of multiple possibly interacting flow subsystems that include pumps, valves, tanks, ducts, sensors, and the like); 'Intelligent' is used here in the sense of artificial intelligence. An intelligent element may be physical or virtual, it is network enabled, and it is able to manage data, information, and knowledge (DIaK) focused on determining its condition in the context of the entire SoS; As used here, 'health' signifies the functionality and/or structural integrity of an engineering system, subsystem, or process (leading to determination of the health of components); 'Process' can signify either a physical process in the usual sense of the word or an element into which functionally related sensors are grouped; 'Element' can signify a component (e.g., an actuator, a valve), a process, a controller, an actuator, a subsystem, or a system; The term Integrated System Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, prognosis of future anomalies), and provide data, information, and knowledge (DIaK) not just data to control systems for safe and effective operation. A major novel aspect of the present development is the concept of intelligent integration. The purpose of intelligent integration, as defined and

  7. Integrating Environmental and Information Systems Management: An Enterprise Architecture Approach

    Science.gov (United States)

    Noran, Ovidiu

    Environmental responsibility is fast becoming an important aspect of strategic management as the reality of climate change settles in and relevant regulations are expected to tighten significantly in the near future. Many businesses react to this challenge by implementing environmental reporting and management systems. However, the environmental initiative is often not properly integrated in the overall business strategy and its information system (IS) and as a result the management does not have timely access to (appropriately aggregated) environmental information. This chapter argues for the benefit of integrating the environmental management (EM) project into the ongoing enterprise architecture (EA) initiative present in all successful companies. This is done by demonstrating how a reference architecture framework and a meta-methodology using EA artefacts can be used to co-design the EM system, the organisation and its IS in order to achieve a much needed synergy.

  8. The Assured Storage Integrated Management System: What is it and what will it cost?

    International Nuclear Information System (INIS)

    Kerr, T.A.; Newberry, W.F.

    1996-01-01

    The Assured Storage Integrated Management System for low-level radioactive waste as an alternative to traditional disposal is attracting favorable attention from many states, regulators, processors, and low-level radioactive waste generators. open-quotes Assured storageclose quotes is defined as a management system for safely isolating waste, while preserving options for its long-term management, through: robust, accessible facilities; planned preventive maintenance; and sureties adequate to address contingencies or implement future alternatives. Following introduction of the concept in RADWASTE Magazine, the Connecticut Hazardous Waste Management Service (among several others) requested a briefing on the idea. The Connecticut Hazardous Waste Management Service then requested that the National Low-Level Waste Management Program at the Idaho National Engineering Laboratory evaluate the life cycle costs of the Assured Storage Integrated Management System versus traditional disposal. Building on some of that work, this paper discusses the concept of an Assured Storage Integrated Management System for low-level radioactive waste as well as examines cost elements of the Assured Storage Integrated Management System in comparison to traditional disposal facilities. Further analyses conducted for the Connecticut study will more clearly define and quantify potential differences in life-cycle costs between the Assured Storage Integrated Management System and traditional disposal

  9. Integrated Management System – Scope, Possibilities And Methodology

    Directory of Open Access Journals (Sweden)

    Čekanová Katarína

    2015-06-01

    Full Text Available Organizations are becoming more aware of the importance of integrated management systems (IMS. Interest in this subject indicates that IMS are seen as “management systems of the future”. Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  10. Battery management systems with thermally integrated fire suppression

    Science.gov (United States)

    Bandhauer, Todd M.; Farmer, Joseph C.

    2017-07-11

    A thermal management system is integral to a battery pack and/or individual cells. It relies on passive liquid-vapor phase change heat removal to provide enhanced thermal protection via rapid expulsion of inert high pressure refrigerant during abnormal abuse events and can be integrated with a cooling system that operates during normal operation. When a thermal runaway event occurs and sensed by either active or passive sensors, the high pressure refrigerant is preferentially ejected through strategically placed passages within the pack to rapidly quench the battery.

  11. Towards integrated hygiene and food safety management systems: the Hygieneomic approach.

    Science.gov (United States)

    Armstrong, G D

    1999-09-15

    Integrated hygiene and food safety management systems in food production can give rise to exceptional improvements in food safety performance, but require high level commitment and full functional involvement. A new approach, named hygieneomics, has been developed to assist management in their introduction of hygiene and food safety systems. For an effective introduction, the management systems must be designed to fit with the current generational state of an organisation. There are, broadly speaking, four generational states of an organisation in their approach to food safety. They comprise: (i) rules setting; (ii) ensuring compliance; (iii) individual commitment; (iv) interdependent action. In order to set up an effective integrated hygiene and food safety management system a number of key managerial requirements are necessary. The most important ones are: (a) management systems must integrate the activities of key functions from research and development through to supply chain and all functions need to be involved; (b) there is a critical role for the senior executive, in communicating policy and standards; (c) responsibilities must be clearly defined, and it should be clear that food safety is a line management responsibility not to be delegated to technical or quality personnel; (d) a thorough and effective multi-level audit approach is necessary; (e) key activities in the system are HACCP and risk management, but it is stressed that these are ongoing management activities, not once-off paper generating exercises; and (f) executive management board level review is necessary of audit results, measurements, status and business benefits.

  12. Rocket Testing and Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John

    2005-01-01

    Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

  13. Application of the concept of integrated management system in the higher education institutions

    Directory of Open Access Journals (Sweden)

    Janovac Tatjana D.

    2015-01-01

    Full Text Available The concept of integrated management system in higher education is a new approach to organizing, and it has an aim to increase efficiency and coordinate all levels of management, decision making, and implementation of the teaching-learning process. Each level of management and decision-making is correlated with factors of internal and external environment. Integrated management system does not introduce new elements, but rationalize the use of the common elements, and thus provides a common synergy effect elements such as policy, planning, continuous improvement, teamwork and process approach. The possibility of applying the concept of integrated management system indicates that raising the quality of teaching-learning process, as well as recognition of liabilities to customers and stakeholders, is the basis for the development of the institution and achieving success. The use of this model is significant in terms of effectiveness, efficiency and sustainability of the business, and the education system. Implementation of integrated management system in the higher education sector represents a new paradigm and the mode of operation.

  14. A web-based system for the integrated water management

    Science.gov (United States)

    Giordano, R.; Passarella, G.; Uricchio, V. F.; Lopez, N.

    2003-04-01

    The success of complexity theory has posed new challenges also in the environmental resources management. From the complexity point of view, in fact, the environment has to be considered as a system with numerous parts interrelated each other by strongly and no-linear feedback relationships. In this perspective, when an action is performed its results become difficult to control. Therefore, to construct and to select the most suitable alternatives for environmental resources management, an holistic approach has to be adopted. In water resources management domain, increasing interest is posed to the integrated management, in which the total system of biotic and a-biotic elements of certain water environment is taken into account. Our contribution moves from the idea that the term integrated has to be referred also to human agents which take decisions influencing the water environment. In other words, Integrated Water Management (IWM) considers how different action affect, and can reinforce, each other and it promotes the coordinated development and management of water, land and related resources. The IWM stresses the interrelationships among the actions at different types, working at different levels of influence, coordinating stakeholders' actions. The coordination requires an appropriate information level about the strategies used by each stakeholder. To improve the information flow inside a watershed and therefore the coordination among agents, a web-based system is proposed. It could be defined as an electronic agora where a set of stakeholders can be involved both in information exchange and in conflicts resolution. More in detail, to improve the coordination process, the proposed system allows the stakeholders to find someone with similar or conflicting interests to collaborate with; to make contact with selected people; to build a common understanding (that is the identification of a common goal, the negotiation about the way this goal should be reached); to

  15. Development and design of an integrated information management system for safe management of radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il [Daesang Information Technology Co., Ltd., Seoul (Korea, Republic of)

    2004-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as; the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections In safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal.

  16. Development and design of an integrated information management system for safe management of radioactive waste

    International Nuclear Information System (INIS)

    Son, Dong Chan; Hong, Suk Young; An, Kyoung Il

    2004-05-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Objectives can be summarized as; the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized. Public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information. Ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management). The system can compensate for the imperfections In safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control. Re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal

  17. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  18. IDMT an integrated system to manage decommissioning activities

    International Nuclear Information System (INIS)

    Marsiletti, M.; Mini, G.; Orlandi, S.

    2003-01-01

    In the frame of decommissioning activities Ansaldo has developed a set of Integrated Decommissioning Management Tools (IDMT) addressed to dismantling work as well as to management of the wastes. The tools MIRAD and DECOM arise from the project of dismantling Italian NPPs (e.g. Caorso) as described in this paper. MIRAD is an integration between a 3 D CAD Model of the NPP in as build configuration and a computerized database (presently an MS Access application) which stores the information related to the radiological measurements detected through in field monitoring associated to any item present in the plant. DECOM is an integration system between a 3 D CAD Model of the NPP (as minimum for the controlled zone) in as-built configuration and a computerized database (presently an MS Access application) which stores the information associated to primary and secondary wastes produced during operation, dismantling or treatment activities.The IDMT system is currently used in the following NPPs in Italy: Caorso NPP (Mark II GE Containment BWR), Garigliano NPP (Dual Cycle GE BWR) and Trino NPP (Westinghouse PWR Plant). (authors)

  19. The quality management system in leading organization of the integrated structure

    Directory of Open Access Journals (Sweden)

    Kunitsyn A. M.

    2018-02-01

    Full Text Available the article has analyzed the problem of integrated structure management. The author has noted that the implementation of recommendations outlined in the article will allow building and improving the quality management system in leading organization of integrated structure on a regular basis that meets the requirements.

  20. THE IMPLEMENTATION OF THE INTEGRATED MANAGEMENT SYSTEMS IN TOURIST PENSION

    Directory of Open Access Journals (Sweden)

    Elena G. CONDREA

    2014-04-01

    Full Text Available We can say that you cannot maintain yourself on the current market of rural tourism operators unless you provide customers with quality products and services, prepared foods safe for consumption, and, not least, if you do not prove you are concerned with ensuring a healthy and clean environment, environmental protection. In this paper we intend to present some aspects of implementing an integrated management system of quality - food security - the average level of tourist pension, and highlight the benefits brought by this ongoing process to the respective operators in rural tourism. To this end, we studied the standards, references available in this area, and documents produced within guesthouses with the implementation of various management systems components of an integrated quality - environment - food security management system.

  1. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  2. Managing the tensions in integrating global organisations : The role of performance management systems

    NARCIS (Netherlands)

    Busco, C.; Giovannoni, E.; Scapens, R.W.

    The paper explores the role of performance management systems (PMSs) in integrating global organisations (GOs). It investigates the ways in which the diverse entities that comprise a GO can be co-ordinated and integrated to achieve a global unity of effort, while leaving space for local adaptation,

  3. Integrated systems for power plant cooling and wastewater management

    International Nuclear Information System (INIS)

    Haith, D.A.

    1975-01-01

    The concept of integrated management of energy and water resources, demonstrated in hydropower development, may be applicable to steam-generated power, also. For steam plants water is a means of disposing of a waste product, which is unutilized energy in the form of heat. One framework for the evolution of integrated systems is the consideration of possible technical linkages between power plant cooling and municipal wastewater management. Such linkages include the use of waste heat as a mechanism for enhancing wastewater treatment, the use of treated wastewater as make-up for evaporative cooling structures, and the use of a pond or reservoir for both cooling and waste stabilization. This chapter reports the results of a systematic evaluation of possible integrated systems for power plant cooling and waste water management. Alternatives were analyzed for each of three components of the system--power plant cooling (condenser heat rejection), thermally enhanced waste water treatment, and waste water disposal. Four cooling options considered were evaporative tower, open cycle, spray pond, and cooling pond. Three treatment alternatives considered were barometric condenser-activated sludge, sectionalized condenser-activated sludge, and cooling/stabilization pond. Three disposal alternatives considered were ocean discharge, land application (spray irrigation), and make-up (for evaporative cooling). To facilitate system comparisons, an 1100-MW nuclear power plant was selected. 31 references

  4. An Operational Web-Based Indicator System for Integrated Coastal Zone Management

    Directory of Open Access Journals (Sweden)

    Henning Sten Hansen

    2014-03-01

    Full Text Available Coastal zones are under severe pressure from anthropogenic activities, as well as on-going climate change with associated sea level rise and increased storminess. These challenges call for integrated and forward looking solutions. The concept on Integrated Coastal Zone Management, as defined during the last twenty years, provides the overall policy frames, but tools to support the planning and management efforts are almost lacking. Furthermore, the forward-looking dimension to embrace the effects of climate change is nearly absent in most implementations. The BLAST project, financed by the European Union Regional Fund through the INTERREG IV North Sea Region Programme, aimed at developing a web-based decision support system to assist Integrated Coastal Zone Management from a climate change perspective, and the current paper describes the methods used and the computing platform for implementing a decision support system. The software applied in developing the system is mainly Open Source components, thus, facilitating a more widespread use of the system.

  5. FEMA's Integrated Emergency Management Information System (IEMIS)

    International Nuclear Information System (INIS)

    Jaske, R.T.; Meitzler, W.

    1987-01-01

    FEMA is implementing a computerized system for use in optimizing planning, and for supporting exercises of these plans. Called the Integrated Emergency Management Information System (IEMIS), it consists of a base geographic information system upon which analytical models are superimposed in order to load data and report results analytically. At present, it supports FEMA's work in offsite preparedness around nuclear power stations, but is being developed to deal with a full range of natural and technological accident hazards for which emergency evacuation or population movement is required

  6. Chip Integrated, Hybrid EHD/Capillary Driven Thermal Management System

    Data.gov (United States)

    National Aeronautics and Space Administration — Chip-Integrated, Hybrid EHD/Capillary-Driven Thermal Management System is a two year that will leverage independently attained yet related prototype hardware...

  7. An Integrated Information System for Supporting Quality Management Tasks

    Science.gov (United States)

    Beyer, N.; Helmreich, W.

    2004-08-01

    In a competitive environment, well defined processes become the strategic advantage of a company. Hence, targeted Quality Management ensures efficiency, trans- parency and, ultimately, customer satisfaction. In the particular context of a Space Test Centre, a num- ber of specific Quality Management standards have to be applied. According to the revision of ISO 9001 dur- ing 2000, and due to the adaptation of ECSS-Q20-07, process orientation and data analysis are key tasks for ensuring and evaluating the efficiency of a company's processes. In line with these requirements, an integrated management system for accessing the necessary infor- mation to support Quality Management and other proc- esses has been established. Some of its test-related fea- tures are presented here. Easy access to the integrated management system from any work place at IABG's Space Test Centre is ensured by means of an intranet portal. It comprises a full set of quality-related process descriptions, information on test facilities, emergency procedures, and other relevant in- formation. The portal's web interface provides direct access to a couple of external applications. Moreover, easy updating of all information and low cost mainte- nance are features of this integrated information system. The timely and transparent management of non- conformances is covered by a dedicated NCR database which incorporates full documentation capability, elec- tronic signature and e-mail notification of concerned staff. A search interface allows for queries across all documented non-conformances. Furthermore, print ver- sions can be generated at any stage in the process, e.g. for distribution to customers. Feedback on customer satisfaction is sought through a web-based questionnaire. The process is initiated by the responsible test manager through submission of an e- mail that contains a hyperlink to a secure website, ask- ing the customer to complete the brief online form, which is directly fed to a database

  8. Development of the Mathematical Model of Integrated Management System for an Airline

    Directory of Open Access Journals (Sweden)

    Bogdane Ruta

    2016-12-01

    Full Text Available At the present stage of airline development the most effective way to increase safety is to introduce a systematic approach to the management of the organization. The creation of a single integrated management system including the combination of resources will make it possible to maintain the necessary level of quality of aviation services with safety as a key indicator. The article offers a model of such an integrated management system for medium level airlines.

  9. Integrated Geo Hazard Management System in Cloud Computing Technology

    Science.gov (United States)

    Hanifah, M. I. M.; Omar, R. C.; Khalid, N. H. N.; Ismail, A.; Mustapha, I. S.; Baharuddin, I. N. Z.; Roslan, R.; Zalam, W. M. Z.

    2016-11-01

    Geo hazard can result in reducing of environmental health and huge economic losses especially in mountainous area. In order to mitigate geo-hazard effectively, cloud computer technology are introduce for managing geo hazard database. Cloud computing technology and it services capable to provide stakeholder's with geo hazards information in near to real time for an effective environmental management and decision-making. UNITEN Integrated Geo Hazard Management System consist of the network management and operation to monitor geo-hazard disaster especially landslide in our study area at Kelantan River Basin and boundary between Hulu Kelantan and Hulu Terengganu. The system will provide easily manage flexible measuring system with data management operates autonomously and can be controlled by commands to collects and controls remotely by using “cloud” system computing. This paper aims to document the above relationship by identifying the special features and needs associated with effective geohazard database management using “cloud system”. This system later will use as part of the development activities and result in minimizing the frequency of the geo-hazard and risk at that research area.

  10. Technology management: case study of an integrated health system.

    Science.gov (United States)

    Dahl, D H; McFarlan, T K

    1994-12-01

    Technology management has assumed a role of vital importance in today's health care environment. Capital reserves and operating income have been stretched by pervasive and expensive technologies, while overall reimbursement has been reduced. It is imperative for hospitals to develop and consistently use technology management processes that begin prior to a technology's introduction in the hospital and continue throughout its life cycle. At Samaritan Health System (SHS), an integrated health care delivery system based in Phoenix, technology management provides tools to improve decision making and assist in the system's integration strategy as well as control expenses. SHS uses a systemwide technology-specific plan to guide acquisition and/or funding decisions. This plan describes how particular technologies can help achieve SHS' organizational goals such as promoting system integration and/or improving patient outcomes while providing good economic value. After technologies are targeted in this systemwide plan they are prioritized using a two-stage capital prioritization process. The first stage of the capital prioritization process considers the quantitative and qualitative factors critical for equitable capital distribution across the system. The second stage develops a sense of ownership among the parties that affect and are affected by the allocation at a facility level. This process promotes an efficient, effective, equitable, and defensible approach to resource allocation and technology decision making. Minimizing equipment maintenance expenditures is also an integral part of technology management at SHS. The keys to reducing maintenance expenditures are having a process in place that supports a routine fiscal evaluation of maintenance coverage options and ensuring that manufacturers are obligated to provide critical maintenance resources at the time of equipment purchase. Maintenance service options under consideration in this report include full

  11. An analysis of the perceived difficulties arising during the process of integrating management systems

    Directory of Open Access Journals (Sweden)

    Jesus Abad

    2016-09-01

    Originality/value: Most research emphasises the benefits of integrated management systems. By analysing the difficulties that arise during the integration process, this study contributes to fill a gap in the literature on the problems associated with processes of organisational change, in our case the integration of management systems.

  12. A system and approach for total pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd; Neidhardt, Dietmar [Tuboscope Pipeline Services, Houston, TX (United States); Gonzalez, Oscar [Tuboscope Mexico S.A. de C.V., Mexico, D.F. (Mexico)

    2005-07-01

    Pipeline rehabilitation and maintenance decisions are made using a wide variety of data, criteria, and expertise. The goal is to arrive at an optimal plan that considers risk and best return on Repair and Maintenance (R and M) expenditures for aging pipeline systems in both regulated and non-regulated environments. In order to achieve these goals, historical, operations, and assessment data is gathered, aligned and integrated as part of a baseline assessment. Integrity threats are identified based on operations and industry experience, and combined with potential consequences to public safety, the environment, and business to clearly delineate high risk exposure segments in the system. Integrity assessments are conducted in a prioritized manner, using the most appropriate technology and methods to address the threats. These include In Line Inspection technologies: MFL, Deformation, UT, INS (combinations thereof), Direct Assessment for EC and SCC threats, Hydro testing, and other indirect methods. From these results, decisions are made and R and M plans developed. To arrive at an optimal R and M plan, proper use of existing data, new integrity assessment data, and decision risk models is required. This paper presentation will detail the tactical aspect of an effective integrity management platform. Experience in decision support, operations priorities and execution of a rehabilitation plan using LinaView Pro{sup TM} integrity management system with risk-based integrity tools and maintenance planning will be presented. A process overview, results, and benefits will be given using these examples from operating oil and gas transmission pipelines. (author)

  13. DESIGN OF INFORMATION MANAGEMENT SYSTEM OF VERTICALLY INTEGRATED AGRICULTURAL HOLDINGS

    Directory of Open Access Journals (Sweden)

    Александр Витальевич ШМАТКО

    2015-05-01

    Full Text Available The paper deals with an approach to the design and development of information systems for the management and optimization of the organizational structure of vertically integrated agricultural holdings. A review of the problems of building and improving the organizational structure of vertically integrated agricultural holding is made. A method of constructing a discrete model management structure agricultural holding, which minimizes the costs associated with attracting applicants to work, is proposed.

  14. Sensor Area Network for Integrated Systems Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition of every element in a complex System...

  15. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  16. Application of an integrated risk management system for improved maintenance in industrial plants

    Energy Technology Data Exchange (ETDEWEB)

    Jovanovic, A.; Balos, D.T.; Vinod, G.; Balos, D. [Steinbeis Advanced Risk Technologies, Stuttgart (Germany); Stanojevic, P. [NIS - Petroleum Industry of Serbia, Novi Sad (Serbia)

    2007-06-15

    The paper presents the application of the Integrated Risk Management System (iRiS) and its application to the areas of Risk Based Inspection (RBI), Reliability Centered Maintenance (RCM), Root Cause Failure Analysis (RCFA) and Health, Safety and Environment (HSE). The web-based system integrates also the aspects of risk management related to data acquisition and management and interactive reporting and controlled use of single parts of the system by various individual users and/or user levels. A complementing part of the system is a tool for project management including the documentation and activity management, as well as scheduling and e-education and e-training. The complementing parts of the system are the CMMS part (maintenance management), the extension of HSE to HSSE (including the 'security' aspects and providing links to the disaster management system) and further interfacing towards general management system and process modeling and management systems. Experiences from the applications of system in Hungary (at over 60 units) and in Serbia, for several refineries and further units in upstream and downstream, are presented in the paper. (orig.)

  17. INTEGRATED MANAGEMENT SYSTEM FOR A SOCIETY FROM INDUSTRY OF MACHINERY AND EQUIPMENT

    Directory of Open Access Journals (Sweden)

    Constanţa RĂDULESCU

    2014-05-01

    Full Text Available In this paper shows the importance that it has SMI in a society of the industry of machinery and equipment. An integrated management system is the mode to design, implement and certify two or more management systems: Quality - Environment, Quality -Environment - Safety and Occupational Health. By implementing the system, the society themselves hires in the development and continuous improvement of the system in accordance with the ones three standards and with objective of activity of the society. Also, in the paper themselves presents the advantages and disadvantages of implementing this integrated system.

  18. Understanding Organizational Memory from the Integrated Management Systems (ERP

    Directory of Open Access Journals (Sweden)

    Gilberto Perez

    2013-10-01

    Full Text Available With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP, we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP we tried to draw a parallel between the functions and structures of Organizational Memory and features and characteristics of ERPs. The choice of the ERP system for this study was made due to the complexity and broad scope of this system. It was verified that the ERPs adequately support many functions of the Organizational Memory, highlighting the implementation of logical processes, practices and rules in business. It is hoped that the dialogue presented here can contribute to the advancement of the understanding of organizational memory, since the similarity of Human Memory is a fertile field and there is still much to be researched.

  19. Real-Time Rocket/Vehicle System Integrated Health Management Laboratory For Development and Testing of Health Monitoring/Management Systems

    Science.gov (United States)

    Aguilar, R.

    2006-01-01

    Pratt & Whitney Rocketdyne has developed a real-time engine/vehicle system integrated health management laboratory, or testbed, for developing and testing health management system concepts. This laboratory simulates components of an integrated system such as the rocket engine, rocket engine controller, vehicle or test controller, as well as a health management computer on separate general purpose computers. These general purpose computers can be replaced with more realistic components such as actual electronic controllers and valve actuators for hardware-in-the-loop simulation. Various engine configurations and propellant combinations are available. Fault or failure insertion capability on-the-fly using direct memory insertion from a user console is used to test system detection and response. The laboratory is currently capable of simulating the flow-path of a single rocket engine but work is underway to include structural and multiengine simulation capability as well as a dedicated data acquisition system. The ultimate goal is to simulate as accurately and realistically as possible the environment in which the health management system will operate including noise, dynamic response of the engine/engine controller, sensor time delays, and asynchronous operation of the various components. The rationale for the laboratory is also discussed including limited alternatives for demonstrating the effectiveness and safety of a flight system.

  20. Integrated dynamic modeling and management system mission analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.K.

    1994-12-28

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied.

  1. Integrated dynamic modeling and management system mission analysis

    International Nuclear Information System (INIS)

    Lee, A.K.

    1994-01-01

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied

  2. Integrated management system - ground for the global performance

    International Nuclear Information System (INIS)

    Pereira Filho, Jorge Amorim

    2000-01-01

    Organizations working in the pursuit of a sustainable development must create and continuously update their management systems, in order to achieve harmonic and lasting global results, capable of satisfying partners and clients in short and long terms. Such an improvement can be obtained by integrating preexisting classic management models, applicable to organizations of all types and scales. The implementation of this unique resulting system obeys systematic steps of planning, development, checking and correction, aiming to continuously improve the management. It is in fact a very challenging process because it demands changing people minds, increasing the amount of work and learning of new skills. Though hard-working, such implementation is encouraged both by perceiving the necessity to attain the strategic objectives and by seeing that there are some requisites not yet fully covered by the present system. Finally, this improved management system results in a better global performance, recorded under four angles: financial, increased client satisfaction, better internal processes and continuous learning, driving the organization to be more competitive and successful in the future. (author)

  3. Development of Integrated Evaluation System for Severe Accident Management

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Ha; Kim, K. R.; Park, S. H.; Park, S. Y.; Park, J. H.; Song, Y. M.; Ahn, K. I.; Choi, Y

    2007-06-15

    The objective of the project is twofold. One is to develop a severe accident database (DB) for the Korean Standard Nuclear Power plant (OPR-1000) and a DB management system, and the other to develop a localized computer code, MIDAS (Multi-purpose IntegrateD Assessment code for Severe accidents). The MELCOR DB has been constructed for the typical representative sequences to support the previous MAAP DB in the previous phase. The MAAP DB has been updated using the recent version of MAAP 4.0.6. The DB management system, SARD, has been upgraded to manage the MELCOR DB in addition to the MAAP DB and the network environment has been constructed for many users to access the SARD simultaneously. The integrated MIDAS 1.0 has been validated after completion of package-wise validation. As the current version of MIDAS cannot simulate the anticipated transient without scram (ATWS) sequence, point-kinetics model has been implemented. Also the gap cooling phenomena after corium relocation into the RPV can be modeled by the user as an input parameter. In addition, the subsystems of the severe accident graphic simulator are complemented for the efficient severe accident management and the engine of the graphic simulator was replaced by the MIDAS instead of the MELCOR code. For the user's convenience, MIDAS input and output processors are upgraded by enhancing the interfacial programs.

  4. Development of Integrated Evaluation System for Severe Accident Management

    International Nuclear Information System (INIS)

    Kim, Dong Ha; Kim, K. R.; Park, S. H.; Park, S. Y.; Park, J. H.; Song, Y. M.; Ahn, K. I.; Choi, Y.

    2007-06-01

    The objective of the project is twofold. One is to develop a severe accident database (DB) for the Korean Standard Nuclear Power plant (OPR-1000) and a DB management system, and the other to develop a localized computer code, MIDAS (Multi-purpose IntegrateD Assessment code for Severe accidents). The MELCOR DB has been constructed for the typical representative sequences to support the previous MAAP DB in the previous phase. The MAAP DB has been updated using the recent version of MAAP 4.0.6. The DB management system, SARD, has been upgraded to manage the MELCOR DB in addition to the MAAP DB and the network environment has been constructed for many users to access the SARD simultaneously. The integrated MIDAS 1.0 has been validated after completion of package-wise validation. As the current version of MIDAS cannot simulate the anticipated transient without scram (ATWS) sequence, point-kinetics model has been implemented. Also the gap cooling phenomena after corium relocation into the RPV can be modeled by the user as an input parameter. In addition, the subsystems of the severe accident graphic simulator are complemented for the efficient severe accident management and the engine of the graphic simulator was replaced by the MIDAS instead of the MELCOR code. For the user's convenience, MIDAS input and output processors are upgraded by enhancing the interfacial programs

  5. Integrate offsites management with information systems

    Energy Technology Data Exchange (ETDEWEB)

    Valleur, M. (TECHNIP, Paris (France))

    1993-11-01

    Computerized offsites management systems in oil refineries offer a unique opportunity to integrate advanced technology into a coherent refinery information system that contributes to benefits-driven optimal operations: from long-term, multirefinery linear programming (LP) models to sequential control of transfer lineups in the tank farm. There are strong incentives to automate and optimize the offsites operations, and benefits can be quantified to justify properly sized projects. The paper discusses the following: business opportunities, oil movement and advanced technology, project scoping and sizing, review of functional requirements, transfer automation, blending optimal control, on-line analyzers, oil movement and scheduling, organizational issues, and investment and benefits analysis.

  6. Fire protection system management in nuclear facilities: strengthening factor of integrated management system - a case study

    International Nuclear Information System (INIS)

    Santos, Joao Regis dos

    2005-01-01

    The present study investigated and analyzed the importance of a system of integrated safety manage, environment and health in a nuclear installation, having as perspective, the fire protection manage. The inquiry was made using a qualitative research involving a case study, where the considered environment was the Reconversion and UO 2 Plant of the Industrias Nucleares do Brasil (INB), located in Resende, Rio de Janeiro and the studied population, the managers and the staff directly involved with the aspects related to the safety of the industrial complex of the related company. The motivation for the research was the search of a bigger interaction of the questions related to the safety, environment and health in the nuclear industry having, as axle of the investigation, the fire protection. As a result, it was observed that in a nuclear installation, although dealing with diversified safety processes, integration is possible and necessary, since there are more reasons for integration than otherwise. (author)

  7. Integrated data management system for radioactive waste and spent fuel in Korea

    International Nuclear Information System (INIS)

    Shin, Young Ho

    2001-03-01

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation, and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. So through the system, the five principles (independence, openness, clearance, efficiency and reliance) of safety regulation can be realized, and public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted by providing reliable information, it can ensure an openness within the international nuclear community and efficiently support international agreements among contracting parties by operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management), the system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible to holistic control and finally re-organize the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy is to integrate safe management and unit safe disposal. For this objectives, benchmark study was performed on similar data base system worldwide and data specification with major input/output data during the first phase of this project

  8. Integrated data management system for radioactive waste and spent fuel in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Park, Yong Taek [Korea Power Engineering Co., Inc., Yongin (Korea, Republic of)

    2002-05-15

    An integrated data management system for the safe management of radioactive waste and spent fuel in Korea is developed to collect basic information, provide the framework for national regulation and improve national competition and efficiency in the management of radioactive waste and spent fuel. This system can also provide public access to information such as a statistical graphs and integrated data from various waste generators to meet increased public needs and interests. Through the system, the five principles(independence, openness, clearance, efficiency and reliance) of safety regulation can be realized and public understanding and reliance on the safety of spent fuel and radioactive waste management can be promoted. By providing reliable information and openness within the international nuclear community can be ensured and efficient support of international agreements among contracting parties can be ensured. By operating safe and efficient management of spent fuel and radioactive waste (IAEA joint convention on the safety of spent fuel management and on the safety of radioactive waste management), the system can compensate for the imperfections in safe regulation of radioactive waste and spent fuel management related to waste generation, storage and disposal, and make it possible for holistic control and reorganization of the basic framework of KINS's intermediate and long term research organization and trends, regarding waste management policy so as to integrate safe management and unit safe disposal. To meet this objectives, design of the database system structure and the study of input/output data validation and verification methodology was performed during the second phase of this project.

  9. ARE METHODS USED TO INTEGRATE STANDARDIZED MANAGEMENT SYSTEMS A CONDITIONING FACTOR OF THE LEVEL OF INTEGRATION? AN EMPIRICAL STUDY

    Directory of Open Access Journals (Sweden)

    Merce Bernardo

    2011-09-01

    Full Text Available Organizations are increasingly implementing multiple Management System Standards (M SSs and considering managing the related Management Systems (MSs as a single system.The aim of this paper is to analyze if methods us ed to integrate standardized MSs condition the level of integration of those MSs. A descriptive methodology has been applied to 343 Spanish organizations registered to, at least, ISO 9001 and ISO 14001. Seven groups of these organizations using different combinations of methods have been analyzed Results show that these organizations have a high level of integration of their MSs. The most common method used, was the process map. Organizations using a combination of different methods achieve higher levels of integration than those using a single method. However, no evidence has been found to confirm the relationship between the method used and the integration level achieved.

  10. Omics Informatics: From Scattered Individual Software Tools to Integrated Workflow Management Systems.

    Science.gov (United States)

    Ma, Tianle; Zhang, Aidong

    2017-01-01

    Omic data analyses pose great informatics challenges. As an emerging subfield of bioinformatics, omics informatics focuses on analyzing multi-omic data efficiently and effectively, and is gaining momentum. There are two underlying trends in the expansion of omics informatics landscape: the explosion of scattered individual omics informatics tools with each of which focuses on a specific task in both single- and multi- omic settings, and the fast-evolving integrated software platforms such as workflow management systems that can assemble multiple tools into pipelines and streamline integrative analysis for complicated tasks. In this survey, we give a holistic view of omics informatics, from scattered individual informatics tools to integrated workflow management systems. We not only outline the landscape and challenges of omics informatics, but also sample a number of widely used and cutting-edge algorithms in omics data analysis to give readers a fine-grained view. We survey various workflow management systems (WMSs), classify them into three levels of WMSs from simple software toolkits to integrated multi-omic analytical platforms, and point out the emerging needs for developing intelligent workflow management systems. We also discuss the challenges, strategies and some existing work in systematic evaluation of omics informatics tools. We conclude by providing future perspectives of emerging fields and new frontiers in omics informatics.

  11. Privacy Impact Assessment for the Integrated Grants Management System

    Science.gov (United States)

    The Integrated Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data is collected, how it will be used, access to the data, the purpose of data collection, and record retention policies.

  12. Integration of CATIA/Smarteam into CERN's corporate engineering data management system

    CERN Document Server

    Hakulinen, Timo; Friman, Per Olof; Pettersson, Thomas Sven; Van Uytvinck, E; Widegren, David; Fournier, G

    2008-01-01

    We present a short overview of the strategy defined to integrate the 3D CAD system CATIA/Smarteam into CERN's corporate Engineering and Equipment Data Management System (EDMS), which is used to manage the information about the Laboratory's installations and technical infrastructure. A brief description of the existing EDMS architecture is given, describing the available project life cycle management features, including CATIA/Smarteam. An overview of the design office requirements on the new CAD system is also presented.

  13. Integrated data management for RODOS

    International Nuclear Information System (INIS)

    Abramowicz, K.; Koschel, A.; Rafat, M.; Wendelgass, R.

    1995-12-01

    The report presents the results of a feasibility study on an integrated data organisation and management in RODOS, the real-time on-line decision support system for off-site nuclear emergency management. The conceptual design of the functional components of the integrated data management are described taking account of the software components and the operation environment of the RODOS system. In particular, the scheme architecture of a database integration manager for accessing and updating a multi-database system is discussed in detail under a variety of database management aspects. Furthermore, the structural design of both a simple knowledge database and a real-time database are described. Finally, some short comments on the benefits and disadvantages of the proposed concept of data integration in RODOS are given. (orig.) [de

  14. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  15. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  16. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    Energy Technology Data Exchange (ETDEWEB)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  17. Nuclear plant engineering work and integrated management system

    International Nuclear Information System (INIS)

    Ohkubo, Y.; Obata, T.; Tanaka, K.

    1992-01-01

    The Application of computers to the design, engineering, manufacturing and construction works of nuclear power plants has greatly contributed to improvement of productivity and reliability in the nuclear power plants constructed by Mitsubishi Nuclear Group for more than ten years. However, in most cases, those systems have been developed separately and utilized independently in different computer software and hardware environments and have not been fully utilized to achieve high efficiency and reliability. In order to drastically increase the productivity and efficiency, development of NUclear power plant engineering Work and INtegrated manaGement System (NUWINGS) started in 1987 to unify and integrate various conventional and developing systems using the state-of-the-art computer technology. The NUWINGS is almost completed and is now applied to actual plant construction. (author)

  18. Hydromentor: An integrated water resources monitoring and management system at modified semi-arid watersheds

    Science.gov (United States)

    Vasiliades, Lampros; Sidiropoulos, Pantelis; Tzabiras, John; Kokkinos, Konstantinos; Spiliotopoulos, Marios; Papaioannou, George; Fafoutis, Chrysostomos; Michailidou, Kalliopi; Tziatzios, George; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-04-01

    Natural and engineered water systems interact throughout watersheds and while there is clearly a link between watershed activities and the quantity and quality of water entering the engineered environment, these systems are considered distinct operational systems. As a result, the strategic approach to data management and modeling within the two systems is very different, leading to significant difficulties in integrating the two systems in order to make comprehensive watershed decisions. In this paper, we describe the "HYDROMENTOR" research project, a highly-structured data storage and exchange system that integrates multiple tools and models describing both natural and modified environments, to provide an integrated tool for management of water resources. Our underlying objective in presenting our conceptual design for this water information system is to develop an integrated and automated system that will achieve monitoring and management of the water quantity and quality at watershed level for both surface water (rivers and lakes) and ground water resources (aquifers). The uniqueness of the system is the integrated treatment of the water resources management issue in terms of water quantity and quality in current climate conditions and in future conditions of climatic change. On an operational level, the system provides automated warnings when the availability, use and pollution levels exceed allowable limits pre-set by the management authorities. Decision making with respect to the apportionment of water use by surface and ground water resources are aided through this system, while the relationship between the polluting activity of a source to total incoming pollution by sources are determined; this way, the best management practices for dealing with a crisis are proposed. The computational system allows the development and application of actions, interventions and policies (alternative management scenarios) so that the impacts of climate change in quantity

  19. Integrated software system for improving medical equipment management.

    Science.gov (United States)

    Bliznakov, Z; Pappous, G; Bliznakova, K; Pallikarakis, N

    2003-01-01

    The evolution of biomedical technology has led to an extraordinary use of medical devices in health care delivery. During the last decade, clinical engineering departments (CEDs) turned toward computerization and application of specific software systems for medical equipment management in order to improve their services and monitor outcomes. Recently, much emphasis has been given to patient safety. Through its Medical Device Directives, the European Union has required all member nations to use a vigilance system to prevent the reoccurrence of adverse events that could lead to injuries or death of patients or personnel as a result of equipment malfunction or improper use. The World Health Organization also has made this issue a high priority and has prepared a number of actions and recommendations. In the present workplace, a new integrated, Windows-oriented system is proposed, addressing all tasks of CEDs but also offering a global approach to their management needs, including vigilance. The system architecture is based on a star model, consisting of a central core module and peripheral units. Its development has been based on the integration of 3 software modules, each one addressing specific predefined tasks. The main features of this system include equipment acquisition and replacement management, inventory archiving and monitoring, follow up on scheduled maintenance, corrective maintenance, user training, data analysis, and reports. It also incorporates vigilance monitoring and information exchange for adverse events, together with a specific application for quality-control procedures. The system offers clinical engineers the ability to monitor and evaluate the quality and cost-effectiveness of the service provided by means of quality and cost indicators. Particular emphasis has been placed on the use of harmonized standards with regard to medical device nomenclature and classification. The system's practical applications have been demonstrated through a pilot

  20. Chip Integrated, Hybrid EHD/Capillary Driven Thermal Management System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Chip-Integrated, Hybrid EHD/Capillary-Driven Thermal Management System is a two year that will leverage independently attained yet related prototype hardware...

  1. Case Mix Management Systems: An Opportunity to Integrate Medical Records and Financial Management System Data Bases

    OpenAIRE

    Rusnak, James E.

    1987-01-01

    Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The h...

  2. Integrated System Health Management (ISHM) and Autonomy

    Science.gov (United States)

    Figueroa, Fernando; Walker, Mark G.

    2018-01-01

    Systems capabilities on ISHM (Integrated System Health Management) and autonomy have traditionally been addressed separately. This means that ISHM functions, such as anomaly detection, diagnostics, prognostics, and comprehensive system awareness have not been considered traditionally in the context of autonomy functions such as planning, scheduling, and mission execution. One key reason is that although they address systems capabilities, both ISHM and autonomy have traditionally individually been approached as independent strategies and models for analysis. Additionally, to some degree, a unified paradigm for ISHM and autonomy has been difficult to implement due to limitations of hardware and software. This paper explores a unified treatment of ISHM and autonomy in the context of distributed hierarchical autonomous operations.

  3. Software for the occupational health and safety integrated management system

    International Nuclear Information System (INIS)

    Vătăsescu, Mihaela

    2015-01-01

    This paper intends to present the design and the production of a software for the Occupational Health and Safety Integrated Management System with the view to a rapid drawing up of the system documents in the field of occupational health and safety

  4. Software for the occupational health and safety integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Vătăsescu, Mihaela [University Politehnica Timisoara, Department of Engineering and Management, 5 Revolutiei street, 331128 Hunedoara (Romania)

    2015-03-10

    This paper intends to present the design and the production of a software for the Occupational Health and Safety Integrated Management System with the view to a rapid drawing up of the system documents in the field of occupational health and safety.

  5. Integrated water management system - Description and test results. [for Space Station waste water processing

    Science.gov (United States)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  6. Development of an integrated database management system to evaluate integrity of flawed components of nuclear power plant

    International Nuclear Information System (INIS)

    Mun, H. L.; Choi, S. N.; Jang, K. S.; Hong, S. Y.; Choi, J. B.; Kim, Y. J.

    2001-01-01

    The object of this paper is to develop an NPP-IDBMS(Integrated DataBase Management System for Nuclear Power Plants) for evaluating the integrity of components of nuclear power plant using relational data model. This paper describes the relational data model, structure and development strategy for the proposed NPP-IDBMS. The NPP-IDBMS consists of database, database management system and interface part. The database part consists of plant, shape, operating condition, material properties and stress database, which are required for the integrity evaluation of each component in nuclear power plants. For the development of stress database, an extensive finite element analysis was performed for various components considering operational transients. The developed NPP-IDBMS will provide efficient and accurate way to evaluate the integrity of flawed components

  7. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  8. Geoinformation Systems as a Tool of the Integrated Tourist Spaces Management

    Directory of Open Access Journals (Sweden)

    Kolesnikovich Victor

    2014-09-01

    Full Text Available Introduction. Currently tourist activity management is in need of creating special conditions for the development of integrated management tools based on the general information and analytical base. Material and methods. The creation of architecture and the content of geoinformation and hybrid information systems are oriented at the usage of the Integrated Tourist Spaces Management (ITSM to set up a specific claim related to the features of management model. The authors created the concept of tourist space. The information and the analytical system are used to create the information model of tourist space. Information support development of ITSM system is a sort of a hybrid system: an expert system constructed on the basis of GIS. Results and conclusions. By means of GIS collecting, storage, analysis and graphic visualization of spatial data and the related information on the objects presented in an expert system is provided. The offered approach leads to the formation of an information system and the analytical maintenance of not only human decision-making, but it also promotes the creation of new tourist products based on more and more differentiated inquiries of clients or a ratio of the price and quality (from the point of view of satisfaction of inquiries.

  9. IDESSA: An Integrative Decision Support System for Sustainable Rangeland Management in Southern African Savannas

    Science.gov (United States)

    Meyer, Hanna; Authmann, Christian; Dreber, Niels; Hess, Bastian; Kellner, Klaus; Morgenthal, Theunis; Nauss, Thomas; Seeger, Bernhard; Tsvuura, Zivanai; Wiegand, Kerstin

    2017-04-01

    Bush encroachment is a syndrome of land degradation that occurs in many savannas including those of southern Africa. The increase in density, cover or biomass of woody vegetation often has negative effects on a range of ecosystem functions and services, which are hardly reversible. However, despite its importance, neither the causes of bush encroachment, nor the consequences of different resource management strategies to combat or mitigate related shifts in savanna states are fully understood. The project "IDESSA" (An Integrative Decision Support System for Sustainable Rangeland Management in Southern African Savannas) aims to improve the understanding of the complex interplays between land use, climate patterns and vegetation dynamics and to implement an integrative monitoring and decision-support system for the sustainable management of different savanna types. For this purpose, IDESSA follows an innovative approach that integrates local knowledge, botanical surveys, remote-sensing and machine-learning based time-series of atmospheric and land-cover dynamics, spatially explicit simulation modeling and analytical database management. The integration of the heterogeneous data will be implemented in a user oriented database infrastructure and scientific workflow system. Accessible via web-based interfaces, this database and analysis system will allow scientists to manage and analyze monitoring data and scenario computations, as well as allow stakeholders (e. g. land users, policy makers) to retrieve current ecosystem information and seasonal outlooks. We present the concept of the project and show preliminary results of the realization steps towards the integrative savanna management and decision-support system.

  10. EFFICIENCY INDICATORS INFORMATION MANAGEMENT IN INTEGRATED SECURITY SYSTEMS

    Directory of Open Access Journals (Sweden)

    N. S. Rodionova

    2014-01-01

    Full Text Available Summary. Introduction of information technology to improve the efficiency of security activity leads to the need to consider a number of negative factors associated with in consequence of the use of these technologies as a key element of modern security systems. One of the most notable factor is the exposure to information processes in protection systems security threats. This largely relates to integrated security systems (ISS is the system of protection with the highest level of informatization security functions. Significant damage to protected objects that they could potentially incur as a result of abnormal operation ISS, puts a very actual problem of assessing factors that reduce the efficiency of the ISS to justify the ways and methods to improve it. Because of the nature of threats and blocking distortion of information in the ISS of interest are: the volume undistorted ISF working environment, as a characteristic of data integrity; time access to information as a feature of its availability. This in turn leads to the need to use these parameters as the performance characteristics of information processes in the ISS - the completeness and timeliness of information processing. The article proposes performance indicators of information processes in integrated security systems in terms of optimal control procedures to protect information from unauthorized access. Set the considered parameters allows to conduct comprehensive security analysis of integrated security systems, and to provide recommendations to improve the management of information security procedures in them.

  11. Sensor Area Network for Integrated Systems Health Management, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a...

  12. Odel of Dynamic Integration of Lean Shop Floor Management Within the Organizational Management System

    Science.gov (United States)

    Iuga, Virginia; Kifor, Claudiu

    2014-12-01

    The key to achieve a sustainable development lies in the customer satisfaction through improved quality, reduced cost, reduced delivery lead times and proper communication. The objective of the lean manufacturing system (LMS) is to identify and eliminate the processes and resources which do not add value to a product. The following paper aims to present a proposal of further development of integrated management systems in organizations through the implementation of lean shop floor management. In the first part of the paper, a dynamic model of the implementation steps will be presented. Furthermore, the paper underlines the importance of implementing a lean culture parallel with each step of integrating the lean methods and tools. The paper also describes the Toyota philosophy, tools, and the supporting lean culture necessary to implementing an efficient lean system in productive organizations

  13. Making Technology Ready: Integrated Systems Health Management

    Science.gov (United States)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  14. Risk and integrity management system for PETRONAS Gas Berhad's gas and liquid hydrocarbon pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Khalid, Tuan Hj. Ahmad Nadzri bin; Nasir, Osman; Napiah, Mohd Nazmi Mohd Ali [PETRONAS Gas Berhad, Johor (Malaysia); Choong, Evelyn

    2005-07-01

    PETRONAS Gas Berhad (PGB), Malaysia currently operates one of Southeast Asia's largest onshore pipeline systems comprising more than 2,500 km of large diameter high pressure gas and liquid transmission, supply and lateral pipelines. Recognizing the value of a risk based approach to pipeline integrity management program, in 2002 PGB implemented a customized and fully integrated Risk and Integrity Management System (RIMS) which included software modules for: data management; semi-quantitative risk assessment; risk control cost benefit analyses; defect assessment; corrosion growth modeling; and reporting. As part of this project, a benchmarking study performed jointly with the contractor, PGB's pipeline integrity programs were also compared with a broad group of international pipeline operators. This study compared the relative ranking position of PGB pre- and post implementation of RIMS. It demonstrated that implementation of RIMS places PGB in a select group of first quartile international pipeline operators, with respect to the implementation of pipeline integrity management best practice. This paper describes the functionalities of RIMS system and how it has benefited PGB, which have been realized to date from its implementation. (author)

  15. An integrated expert system for optimum in core fuel management

    International Nuclear Information System (INIS)

    Abd Elmoatty, Mona S.; Nagy, M.S.; Aly, Mohamed N.; Shaat, M.K.

    2011-01-01

    Highlights: → An integrated expert system constructed for optimum in core fuel management. → Brief discussion of the ESOIFM Package modules, inputs and outputs. → Package was applied on the DALAT Nuclear Research Reactor (0.5 MW). → The Package verification showed good agreement. - Abstract: An integrated expert system called Efficient and Safe Optimum In-core Fuel Management (ESOIFM Package) has been constructed to achieve an optimum in core fuel management and automate the process of data analysis. The Package combines the constructed mathematical models with the adopted artificial intelligence techniques. The paper gives a brief discussion of the ESOIFM Package modules, inputs and outputs. The Package was applied on the DALAT Nuclear Research Reactor (0.5 MW). Moreover, the data of DNRR have been used as a case study for testing and evaluation of ESOIFM Package. This paper shows the comparison between the ESOIFM Package burn-up results, the DNRR experimental burn-up data, and other DNRR Codes burn-up results. The results showed good agreement.

  16. Integrated Management System as constituent of balanced development approach

    International Nuclear Information System (INIS)

    Pasternak, J.

    2005-01-01

    Globalization of the economy makes RAFAKO S.A. react promptly and efficiently to what goes on in the surrounding world. The way this company is organized and managed constitutes the fundamental condition for success and it is this subject that the authors have concentrated on. The restructuring process of the company started in 1998. A business management structure was established and individual fields of activity, as profit or cost centers for budgeting and reporting, were separated. Employment rationalization was started, labour valuation system, its effectiveness and a new payment policy were implemented. In accordance with the stipulation resulting from standard PN-EN ISO 9000:2001, process-like approach to management was assumed. This paper presents the process based approach to management and elements of project management at RAFAKO S.A. The experiences in project management, originating from the history of this company, facilitated considerably the first stages of process management implementation. A brief description of budget planning technique and elements of cost account, as well as how the budget and account are interpreted in the Integrated Management System were presented. (author)

  17. Milestones in Implementation of an Integrated Management System in the Health Sector. Case Study Radiologische Netzwerk Rheinland

    Directory of Open Access Journals (Sweden)

    Claus Nagel-Picioruş

    2016-05-01

    Full Text Available Healthcare organizations in Germany exploit the benefits of the ISO 9000 family of international standards as it became compulsory to implement a quality management system in accordance with ISO 9001 requirements. Until the innovative ISO 9001:2015 proposal it was no direct connection to the other management systems like risk management, knowledge management or environmental management. So far, only few bodies ensured interconnections between different systems of management or associated the quality management system with the strategic planning process. However, healthcare encapsulates supplementary requirements which affect a number of different systems. Additionally, the financial crisis has encouraged the trend to operate integrated reporting beyond financial aspects. This paper aims at presenting the experience on the development of integrated management and reporting system integrated in an organization belonging to the health sector. The work clarifies the steps towards merging distinctly regulated management systems (quality, health or environmental management with strategic planning and controlling, via a Balanced Dashboard (Balanced Scorecard - BSC as well as integrated reporting according to the model International Integrated Reporting Initiative (IIRI in a German medical company - Radiologische Netzwerk Rheinland - RNR AG. Using the case study method, the paper's purpose is to highlight approaches and results of the company that could support practitioners from medical area and bezound. The literature review clarified theoretical concepts while the case study allowed converging comprehensive information and knowledge accumulated by RNR AG, thus helping to bridge the gap between literature on total integrated management reporting and reporting system in healthcare.

  18. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  19. Integration of multi-level marketing management systems geographically industry development

    OpenAIRE

    Aleksandr Lavrov; Lada Polikarpova; Alla Handramai

    2015-01-01

    In the article the authors attempt to develop a multi-level management system territorially industry development in market conditions, built in the widespread use of various types of marketing and their horizontal and vertical integration.

  20. INTEGRATED MANAGEMENT SYSTEMS IN LOCAL PUBLIC ENTERPRIZE FOR PRODUCTION, DISTRIBUTION AND CLEANING OF WASTED WATER

    Directory of Open Access Journals (Sweden)

    Slavko Arsovski

    2007-06-01

    Full Text Available Appearance of large number of management systems, with different and sometimes divergent demands, needs reconsideration of their implementation strategies and their integration in one integrated management system (IMS. So defined IMS would be designed and implemented in different areas. In this paper is presented basic concept of integration of partical management systems in areas of quality (ISO 9001, environmental protection (ISO 14001, occupational health (ISO 18001, food safety (ISO 22000 and accreditation of laboratories (ISO17025/ISO17020. As a pilot organization is choosed local public enterprise for production, supply and drain of water.

  1. DNV RP-F116 integrity management of submarine pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    Leinum, B.H.; Etterdal, B. [Det Norske Veritas (DNV), Hoevik (Norway); Augustinovic, Z. [Dong Energy, Fredericia (Denmark); Paula, A. [Det Norske Veritas (DNV), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The need to keep pipelines operating safely and efficiently is paramount for any operator. Additionally, there is an increasing awareness at both regulatory and public level. Authorities around the world are adopting a more proactive approach as they seek to minimize the risk of human injuries or harm to the environment resulting from pipeline leaks. A joint industry project (JIP) led by DNV Energy is formulating guidelines for how to manage the integrity of submarine pipeline system. The resultant document of recommended practice, DNV RP-F116, will provide the oil and gas industry with a useful tool in an area where no such formal guidance currently exists. This paper gives an overview of the RP and demonstrates the use with a case study for the Siri field. The Siri field is operated by DONG Energy, Denmark and all infield pipelines were subjected to an integrity assessment using the Integrity Management process as outlined in the upcoming DNV RP-116. In parallel with establishing the RP, DNV has further developed the web-based software system, Orbit+, which is aligned with the RP. The software system is implemented and used by Dong Energy. (author)

  2. Integration of knowledge management system for the decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    Iguchi, Yukihiro; Yanagihara, Satoshi

    2016-01-01

    The decommissioning of a nuclear facility is a long term project, handling information which begins from the design, construction and operation. Moreover, the decommissioning project is likely to be extended because of the lack of the waste disposal site especially in Japan. In this situation, because the transfer of knowledge and education to the next generation is a crucial issue, integration and implementation of a system for knowledge management is necessary in order to solve it. For this purpose, the total system of decommissioning knowledge management system (KMS) is proposed. In this system, we have to arrange, organize and systematize the data and information of the plant design, maintenance history, trouble events, waste management records etc. The collected data, information and records should be organized by computer support system e.g. data base system. It becomes a base of the explicit knowledge. Moreover, measures of extracting tacit knowledge from retiring employees are necessary. The experience of the retirees should be documented as much as possible through effective questionnaire or interview process. The integrated knowledge mentioned above should be used for the planning, implementation of dismantlement or education for the future generation. (author)

  3. APPROACHES TO IMPLEMENTATION OF AN INTEGRATED MANAGEMENT SYSTEM IN THE PHARMACEUTICAL INDUSTRY. GALENICAL PHARMACEUTICAL PRODUCTION

    Directory of Open Access Journals (Sweden)

    Ershova Elena Vladimirovna

    2015-10-01

    Full Text Available This article reviews the issues associated with development of an integrated quality management system and its implementation into a galenical pharmaceutical company. Recently, the Russian pharmaceutical industry has been developing extensively: pharmaceutical clusters are being formed, new and innovative technologies are being developed. For the enterprises producing galenical pharmaceutical products, which feature low prices and a high level of competition, development and implementation of management systems is a way to prove their competitiveness. The purpose of this article is to review the architecture and the key elements of integrated management systems for pharmaceutical enterprises, develop an integrated management system in terms of the upcoming revision of ISO 9001:2015, as well as to describe the benefits of implementation of such systems. The presented approach is the result of an educational project implemented within the framework of the MBA programme in "Master of Business Administration (MBA" in the Federal State Budgetary Educational Institution of Continuing Professional Education Pastukhov State Academy of Industrial Management.

  4. Specialty pharmaceuticals care management in an integrated health care delivery system with electronic health records.

    Science.gov (United States)

    Monroe, C Douglas; Chin, Karen Y

    2013-05-01

    The specialty pharmaceuticals market is expanding more rapidly than the traditional pharmaceuticals market. Specialty pharmacy operations have evolved to deliver selected medications and associated clinical services. The growing role of specialty drugs requires new approaches to managing the use of these drugs. The focus, expectations, and emphasis in specialty drug management in an integrated health care delivery system such as Kaiser Permanente (KP) can vary as compared with more conventional health care systems. The KP Specialty Pharmacy (KP-SP) serves KP members across the United States. This descriptive account addresses the impetus for specialty drug management within KP, the use of tools such as an electronic health record (EHR) system and process management software, the KP-SP approach for specialty pharmacy services, and the emphasis on quality measurement of services provided. Kaiser Permanente's integrated system enables KP-SP pharmacists to coordinate the provision of specialty drugs while monitoring laboratory values, physician visits, and most other relevant elements of the patient's therapy. Process management software facilitates the counseling of patients, promotion of adherence, and interventions to resolve clinical, logistic, or pharmacy benefit issues. The integrated EHR affords KP-SP pharmacists advantages for care management that should become available to more health care systems with broadened adoption of EHRs. The KP-SP experience may help to establish models for clinical pharmacy services as health care systems and information systems become more integrated.

  5. Waste Information Management System with Integrated Transportation Forecast Data

    International Nuclear Information System (INIS)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.

    2009-01-01

    The Waste Information Management System with Integrated Transportation Forecast Data was developed to support the Department of Energy (DOE) mandated accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to site waste treatment and disposal were potential critical path issues under the accelerated schedules. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of waste that would be generated by the DOE sites over the next 40 years. Each local DOE site has historically collected, organized, and displayed site waste forecast information in separate and unique systems. However, waste and shipment information from all sites needed a common application to allow interested parties to understand and view the complete complex-wide picture. The Waste Information Management System with Integrated Transportation Forecast Data allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, has deployed the web-based forecast and transportation system and is responsible for updating the waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

  6. The role of bacillus-based biological control agents in integrated pest management systems: plant diseases.

    Science.gov (United States)

    Jacobsen, B J; Zidack, N K; Larson, B J

    2004-11-01

    ABSTRACT Bacillus-based biological control agents (BCAs) have great potential in integrated pest management (IPM) systems; however, relatively little work has been published on integration with other IPM management tools. Unfortunately, most research has focused on BCAs as alternatives to synthetic chemical fungicides or bactericides and not as part of an integrated management system. IPM has had many definitions and this review will use the national coalition for IPM definition: "A sustainable approach to managing pests by combining biological, cultural, physical and chemical tools in a way that minimizes economic, health and environmental risks." This review will examine the integrated use of Bacillus-based BCAs with disease management tools, including resistant cultivars, fungicides or bactericides, or other BCAs. This integration is important because the consistency and degree of disease control by Bacillus-based BCAs is rarely equal to the control afforded by the best fungicides or bactericides. In theory, integration of several tools brings stability to disease management programs. Integration of BCAs with other disease management tools often provides broader crop adaptation and both more efficacious and consistent levels of disease control. This review will also discuss the use of Bacillus-based BCAs in fungicide resistance management. Work with Bacillus thuringiensis and insect pest management is the exception to the relative paucity of reports but will not be the focus of this review.

  7. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2

    Energy Technology Data Exchange (ETDEWEB)

    PARSONS, J.E.

    2000-07-15

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  8. An integration architecture for knowledge management system and business process management system

    NARCIS (Netherlands)

    Jung, J.; Choi, I.; Song, M.S.

    2007-01-01

    Recently, interests in the notion of process-oriented knowledge management (PKM) from academia and industry have been significantly increased. Comprehensive research and development requirements along with a cogent framework, however, have not been proposed for integrating knowledge management (KM)

  9. A management system integrating radiation protection and safety supporting safety culture in the hospital

    International Nuclear Information System (INIS)

    Almen, A.; Lundh, C.

    2015-01-01

    Quality assurance has been identified as an important part of radiation protection and safety for a considerable time period. A rational expansion and improvement of quality assurance is to integrate radiation protection and safety in a management system. The aim of this study was to explore factors influencing the implementing strategy when introducing a management system including radiation protection and safety in hospitals and to outline benefits of such a system. The main experience from developing a management system is that it is possible to create a vast number of common policies and routines for the whole hospital, resulting in a cost-efficient system. One of the key benefits is the involvement of management at all levels, including the hospital director. Furthermore, a transparent system will involve staff throughout the organisation as well. A management system supports a common view on what should be done, who should do it and how the activities are reviewed. An integrated management system for radiation protection and safety includes key elements supporting a safety culture. (authors)

  10. Saudi Aramco experience towards establishing Pipelines Integrity Management Systems (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    AlAhmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  11. Saudi Aramco experience towards establishing Pipelines Integrity Management System (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Al-Ahmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  12. Integrated Vehicle Health Management (IVHM) for Aerospace Systems

    Science.gov (United States)

    Baroth, Edmund C.; Pallix, Joan

    2006-01-01

    To achieve NASA's ambitious Integrated Space Transportation Program objectives, aerospace systems will implement a variety of new concept in health management. System level integration of IVHM technologies for real-time control and system maintenance will have significant impact on system safety and lifecycle costs. IVHM technologies will enhance the safety and success of complex missions despite component failures, degraded performance, operator errors, and environment uncertainty. IVHM also has the potential to reduce, or even eliminate many of the costly inspections and operations activities required by current and future aerospace systems. This presentation will describe the array of NASA programs participating in the development of IVHM technologies for NASA missions. Future vehicle systems will use models of the system, its environment, and other intelligent agents with which they may interact. IVHM will be incorporated into future mission planners, reasoning engines, and adaptive control systems that can recommend or execute commands enabling the system to respond intelligently in real time. In the past, software errors and/or faulty sensors have been identified as significant contributors to mission failures. This presentation will also address the development and utilization of highly dependable sohare and sensor technologies, which are key components to ensure the reliability of IVHM systems.

  13. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    International Nuclear Information System (INIS)

    CARTER, R.P.

    1999-01-01

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective

  14. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  15. Modeling for Integrated Science Management and Resilient Systems Development

    Science.gov (United States)

    Shelhamer, M.; Mindock, J.; Lumpkins, S.

    2014-01-01

    Many physiological, environmental, and operational risks exist for crewmembers during spaceflight. An understanding of these risks from an integrated perspective is required to provide effective and efficient mitigations during future exploration missions that typically have stringent limitations on resources available, such as mass, power, and crew time. The Human Research Program (HRP) is in the early stages of developing collaborative modeling approaches for the purposes of managing its science portfolio in an integrated manner to support cross-disciplinary risk mitigation strategies and to enable resilient human and engineered systems in the spaceflight environment. In this talk, we will share ideas being explored from fields such as network science, complexity theory, and system-of-systems modeling. Initial work on tools to support these explorations will be discussed briefly, along with ideas for future efforts.

  16. Security management: a question of integration between people, systems and organizations

    International Nuclear Information System (INIS)

    Drukaroff, M. C.; Romano, A.

    2015-01-01

    Safety Management has always been the most important process of the Juzbado Factory since beginning of operations in 1985. this process has evolved, moving from focusing primary on preventive control of operation risks by means of adequate exploitation of Safety Systems, to integrating aspects related with Safety culture and Organization Factors, as key players in order to achieve sustainable safety improvements. This paper presents how Safety Management has evolved at the Factory, emphasizing especially on the integration process of the three main factors affecting safety: people, technology and organizations. (Author)

  17. Methods for assessing the sustainability of integrated municipal waste management and energy supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Luoranen, M.

    2009-07-01

    The general striving to bring down the number of municipal landfills and to increase the reuse and recycling of waste-derived materials across the EU supports the debates concerning the feasibility and rationality of waste management systems. Substantial decrease in the volume and mass of landfill-disposed waste flows can be achieved by directing suitable waste fractions to energy recovery. Global fossil energy supplies are becoming more and more valuable and expensive energy sources for the mankind, and efforts to save fossil fuels have been made. Waste-derived fuels offer one potential partial solution to two different problems. First, waste that cannot be feasibly re-used or recycled is utilized in the energy conversion process according to EU's Waste Hierarchy. Second, fossil fuels can be saved for other purposes than energy, mainly as transport fuels. This thesis presents the principles of assessing the most sustainable system solution for an integrated municipal waste management and energy system. The assessment process includes: Formation of a SISMan (Simple Integrated System Management) model of an integrated system including mass, energy and financial flows, and formation of a MEFLO (Mass, Energy, Financial, Legislational, Other decisionsupport data) decision matrix according to the selected decision criteria, including essential and optional decision criteria. The methods are described and theoretical examples of the utilization of the methods are presented in the thesis. The assessment process involves the selection of different system alternatives (process alternatives for treatment of different waste fractions) and comparison between the alternatives. The first of the two novelty values of the utilization of the presented methods is the perspective selected for the formation of the SISMan model. Normally waste management and energy systems are operated separately according to the targets and principles set for each system. In the thesis the waste

  18. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  19. Integrated System Health Management: Foundational Concepts, Approach, and Implementation

    Science.gov (United States)

    Figueroa, Fernando

    2009-01-01

    A sound basis to guide the community in the conception and implementation of ISHM (Integrated System Health Management) capability in operational systems was provided. The concept of "ISHM Model of a System" and a related architecture defined as a unique Data, Information, and Knowledge (DIaK) architecture were described. The ISHM architecture is independent of the typical system architecture, which is based on grouping physical elements that are assembled to make up a subsystem, and subsystems combine to form systems, etc. It was emphasized that ISHM capability needs to be implemented first at a low functional capability level (FCL), or limited ability to detect anomalies, diagnose, determine consequences, etc. As algorithms and tools to augment or improve the FCL are identified, they should be incorporated into the system. This means that the architecture, DIaK management, and software, must be modular and standards-based, in order to enable systematic augmentation of FCL (no ad-hoc modifications). A set of technologies (and tools) needed to implement ISHM were described. One essential tool is a software environment to create the ISHM Model. The software environment encapsulates DIaK, and an infrastructure to focus DIaK on determining health (detect anomalies, determine causes, determine effects, and provide integrated awareness of the system to the operator). The environment includes gateways to communicate in accordance to standards, specially the IEEE 1451.1 Standard for Smart Sensors and Actuators.

  20. ORGANIZATION AND IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM PROCESSES - CRUISE PORT DUBROVNIK

    Directory of Open Access Journals (Sweden)

    Ivona Vrdoljak Raguz

    2012-01-01

    Full Text Available World cruise market is very dynamic and it is characterised by constant changes in offer and demand. Dubrovnik, as one of the leading port in the Mediterranean is faced with the problem of large concentrations of ships and passengers in a short period of time. Paper provides answers to the questions: how to manage cruise tourism in Dubrovnik? What are the guidelines for the further development of cruising in Dubrovnik? Modern ports management system must be organized and managed in a manner that will ensure the recognition requirements of stakeholders and their fulfilment. All this requires a more complex integrated management system, in which the requirements of quality management will be the basis, and requirements of environmental management needed an upgrade.

  1. Review on Malaysian Rail Transit Operation and Management System: Issues and Solution in Integration

    Science.gov (United States)

    Masirin, Mohd Idrus Mohd; Salin, Aminah Mohd; Zainorabidin, Adnan; Martin, David; Samsuddin, Norshakina

    2017-08-01

    In any context, operation and management of transportation systems are key issues which may affect both life quality and economic development. In large urban agglomerations, an efficient public transportation system may help abate the negative externalities of private car use such as congestion, air and noise pollution, accident and fuel consumption, without excessively penalizing user travel times or zone accessibility. Thus, this study is conducted to appraise the Malaysian rural rail transit operation and management system, which are considered important as there are many issues and solution in integration of the services that need to be tackled more conscientiously. The purpose of this paper is to describe some of the most important issues on integration of services and rail transit system in Malaysian and how to solve or reduce these problems and conflicts. In this paper, it consists of the historical development of rail transit construction in Malaysia. This paper also attempts to identify the important issues related to rail transit services and integration in Malaysian rural rail operation and management system. Comparison is also conducted with other countries such as UK, France, and Japan. Finally, a critical analysis is presented in this paper by looking at the possible application for future Malaysian rail transit operation system and management, especially focusing on enhancing the quality of Malaysian rural rail transit. In conclusion, this paper is expected to successfully review and appraise the existing Malaysian rural rail transit operation and management system pertaining to issues & solution in integration. It is also hoped that reformation or transformation of present service delivery quality of the rail transit operation and management will enable Malaysia to succeed in transforming Malaysian transportation system to greater heights.

  2. Integrated RIS-PACS system

    International Nuclear Information System (INIS)

    Nishihara, Eitaro; Kura, Hiroyuki; Fukushima, Yuki

    1994-01-01

    We have developed an integrated RIS-PACS (radiology information system-picture archiving and communication system) system which supports examination, interpretation, and management in the diagnostic imaging department. The system was introduced in the Toshiba Hospital in May 1993, concurrently with the renewal of the hospital facilities. The integrated RIS-PACS system consists of a radiology information management system, and an image management system. The system supports wet (immediate) reading and chronological comparative reading using viewing workstation, enables routine operations to be performed in the diagnostic imaging department without film transportation, and contributes to the improvement of management efficiency in the department. (author)

  3. Design and management of production systems: Integration of human factors and ergonomics

    DEFF Research Database (Denmark)

    Jensen, Per Langå; Broberg, Ole; Hasle, Peter

    2006-01-01

    Integration of ergonomics, human factors and occupational health and safety into design and management of pro-duction systems has for years been the major strategy for professional within the field. The traditional approach based on establishing ergonomic criteria’s to be integrated into other...

  4. Introducing Knowledge Management into the Integrated Management System of Nuclear Organizations

    International Nuclear Information System (INIS)

    Yanev, Y.; Brandner, A.; Kosilov, A.

    2016-01-01

    Full text: The analysis for introducing knowledge management into an integrated management system in nuclear organizations, conducted by NKMI, and discussed in a number of meetings in IAEA and other organizations has shown that currently there is no full and comprehensive implementation of KM in IMS. NKMI has suggested and developed a common, systematic approach for introducing Knowledge Management in the IMS of a nuclear regulatory organization, based on the concept of competence, graded approach and continuous improvement. The approach is based on the concept of integrating an initial review of all knowledge and competence needed for effective and efficient process implementation including a gap analysis and provision of compensatory measures. Knowledge resources are represented as a knowledge resource matrix, which are necessary to complete a given process successfully. The “performance” of the available knowledge resources contribute to an efficient regulatory process is also reviewed at the end of process implementation where relevant decision for enhancement of knowledge and competence are taken, including capturing, preserving, sharing and reuse of new knowledge, gained through the process implementation. The “knowledge resource matrix” approach is fully based on IAEA recommendation and has already been applied in a number of regulatory processes. (author

  5. A framework for exploring integrated learning systems for the governance and management of public protected areas.

    Science.gov (United States)

    Nkhata, Bimo Abraham; Breen, Charles

    2010-02-01

    This article discusses how the concept of integrated learning systems provides a useful means of exploring the functional linkages between the governance and management of public protected areas. It presents a conceptual framework of an integrated learning system that explicitly incorporates learning processes in governance and management subsystems. The framework is premised on the assumption that an understanding of an integrated learning system is essential if we are to successfully promote learning across multiple scales as a fundamental component of adaptability in the governance and management of protected areas. The framework is used to illustrate real-world situations that reflect the nature and substance of the linkages between governance and management. Drawing on lessons from North America and Africa, the article demonstrates that the establishment and maintenance of an integrated learning system take place in a complex context which links elements of governance learning and management learning subsystems. The degree to which the two subsystems are coupled influences the performance of an integrated learning system and ultimately adaptability. Such performance is largely determined by how integrated learning processes allow for the systematic testing of societal assumptions (beliefs, values, and public interest) to enable society and protected area agencies to adapt and learn in the face of social and ecological change. It is argued that an integrated perspective provides a potentially useful framework for explaining and improving shared understanding around which the concept of adaptability is structured and implemented.

  6. Energy management system for an integrated steel plant

    Energy Technology Data Exchange (ETDEWEB)

    Perti, A.K.; Sankarasubramian, K.; Shivramakrishnan, J. (Bhilai Steel Plant, Bhilai (India))

    1992-09-01

    The cost of energy contributes 35 to 40% to the cost of steel production. Thus a lot of importance is being given to energy conservation in steel production. The paper outlines energy conservation measures at the Bhilai Steel Plant, India. Measures include: modifications to furnaces; partial briquetting of coal charge; and setting up an energy centre to integrate measurement and computer systems with despatches, engineers and managers of energy. 4 refs., 4 figs., 3 tabs.

  7. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    CERN Document Server

    Parsons, J E

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  8. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    International Nuclear Information System (INIS)

    PARSONS, J.E.

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented

  9. Methodological Approaches to Designing Integrated Systems of Management of Food Service Enterprises

    Directory of Open Access Journals (Sweden)

    Yatsun Leonid M.

    2016-02-01

    Full Text Available The article presents materials of studying the processes of designing functions and structures of management of food service enterprises by criteria of composition of the enterprise objectives, their participation in the integration process of production, sales and organization of consumption of food products and services. There have been defined a qualimetric estimation of parameters for enterprises of different size by types of tasks — manufacture of products, marketing activities, customer service, personnel management, etc. Balance schemes of the production and economic system of enterprises regarding cost components and output of food products and services have been developed. The integrated approaches to designing management systems of food service enterprises on the basis of coordination of parameters of the target, linear, functional and resource subsystems have been proposed.

  10. Broad knowledge of information technologies: a prerequisite for the effective management of the integrated information system

    Energy Technology Data Exchange (ETDEWEB)

    Landau, H.B.

    1980-09-01

    There is a trend towards the bringing together of various information technologies into integrated information systems. The managers of these total systems therefore must be familiar with each of the component technologies and how they may be combined into a total information system. To accomplish this, the effective manager should first define the overall system as an integrated flow of information with each step identified; then, the alternate technologies applicable to each step may be selected. Methods of becoming technologically aware are suggested and examples of integrated systems are discussed.

  11. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  12. INTEGRATION OF MANAGEMENT SYSTEM QMS/EMS/OHSAS/FMS/LMS IN WATER SUPPLY ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Slavko Arsovski

    2007-12-01

    Full Text Available Level of difficulties arises when goes up number of integrated management systems (IMS. In this paper are given model and empirical research which provide the details of an integrated management system with five component subsystems in area of water supply. Presented model addresses the issues of scope and carracterisctics based on process approach and is tested in water supply organization in Kragujevac, Serbia. Testing in the proposed model is accomplish through realization project of design and implementation of IMS in regional water supply organization in Kragujevac.

  13. The Integrated Safety Management System (ISMS) of the US Department of Energy

    International Nuclear Information System (INIS)

    Linn, M.A.

    1999-01-01

    While the Integrated Safety Management System (ISMS) program is a fairly rational approach to safety, it represents the culmination of several years of hard-earned lessons learned. Considering the size and the diversity of interrelated elements which make up the USDOE complex, this result shows the determination of both the USDOE and its contractors to bring safety hazards to heel. While these lessons learned were frustrating and expensive, the results were several key insights upon which the ISMS was built: (1) Ensure safety management is integral to the business. Safety management must become part of each work activity, rather that something in addition to or on top of. (2) Tailor the safety requirements to the work and its hazards. In order to be cost-effective and efficient, safety management should have flexibility in order to match safety requirements with the level of the hazards in a graded manner. (3) Safety management must be coherent and integrated. Large and complex organizations are no excuse for fragmented and overlapping safety initiatives and programs. Simple, from the ground up objectives and principles must be defined and used to guide a comprehensive safety management program. (4) A safety management system must balance resources and priorities. The system must provide the means to balance resources against the particular work hazards, recognizing that different degrees of hazards requires corresponding prevention measures. (5) Clear roles and responsibilities for safety management must be defined. Both the regulator and the contractor have specific responsibilities for safety which must be clearly articulated at all levels of the work processes. (6) Those responsible for safety must have the competence to carry it out. Those assigned responsibilities must have the experience, knowledge, skills, and authority to carry them out. As one can surmise, the ISMS is not a new program to be implemented, but rather a new attitude which must be adopted

  14. IMPLEMENTING AN INTEGRATED HEALTH, SAFETY, AND ENVIRONMENTAL MANAGEMENT SYSTEM: THE CASE OF A CONSTRUCTION COMPANY

    Directory of Open Access Journals (Sweden)

    Filippos Tepaskoualos

    2017-12-01

    Full Text Available Over the past two decades, there has been an increasing trend of organizations implementing simultaneously two or more management systems. The structural similarities of these systems - despite the diversity of their fields of application, such as occupational health and safety for OHSAS 18001, and environmental management for ISO 14001 - have enabled many organizations to integrate different systems into a single one, rather than implementing them separately from one another. The purpose of this paper is to examine in depth a case of integration of the ISO 14001 and OHSAS 18001 systems, using a construction company as a research setting, in order to draw conclusions about the level of integration achieved, as well as the benefits, the problems, and the critical success factors of this endeavour. The findings of this study show that both the company's devotion to the fulfillment of the critical success factors and the identical structure of the two systems under consideration have facilitated the successful outcome of integration. However, this does not automatically imply that the company adopted the idea of full integration. Instead, the maximization of integration benefits and the elimination of related problems was achieved through the company's conscious choice to proceed with partial integration, keeping separate manuals, policies, and risk management procedures for each system. This study will be useful in order to understand that partial integration is a perfectly acceptable and realistic solution that, under certain circumstances, may even have a better cost-benefit ratio than full integration.

  15. The key to successful management of STS operations: An integrated production planning system

    Science.gov (United States)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  16. Incorporation of Nuclear Knowledge Management to the Integrated System of Quality and Technological Innovation in Cubaenergía

    International Nuclear Information System (INIS)

    Oviedo Rivero, I.; González García, A.; Amado Picasso, M.; Yera López, B.; Contreras, M.; López Núñez, A.; García Rodríguez, B.; Elías Hardy, L. L.; Rivero Blanco, J. M.; Peña Tornet, A.; Quintana Castillo, N.

    2016-01-01

    Full text: Technical knowledge management and innovation become important tools for organizations to meet the needs and expectations of the market and society in general; especially those related to the peaceful use of nuclear energy. Since 2011 Cubaenergia, under the model of the UNE 166002, integrated process management Scientific and Technological Innovation to the requirements of NC-ISO 9001, compliance with national regulations applicable to the sector. In September 2015 the new ISO 9001 includes a clause that makes explicit mention knowledge. Although this clause is not a standard for knowledge management nor does it imply its obligatory; Cubaenergia decided to expand its integrated management system to include the Nuclear Knowledge Management system. In this article the conceptual framework for the integration of these three systems, diagnosis in the organization and the proposed design and implementation plan of management knowledge management integrated analyzes R&D and the quality management system in Cubaenergía. (author

  17. Integrated Systems Health Management for Space Exploration

    Science.gov (United States)

    Uckun, Serdar

    2005-01-01

    Integrated Systems Health Management (ISHM) is a system engineering discipline that addresses the design, development, operation, and lifecycle management of components, subsystems, vehicles, and other operational systems with the purpose of maintaining nominal system behavior and function and assuring mission safety and effectiveness under off-nominal conditions. NASA missions are often conducted in extreme, unfamiliar environments of space, using unique experimental spacecraft. In these environments, off-nominal conditions can develop with the potential to rapidly escalate into mission- or life-threatening situations. Further, the high visibility of NASA missions means they are always characterized by extraordinary attention to safety. ISHM is a critical element of risk mitigation, mission safety, and mission assurance for exploration. ISHM enables: In-space maintenance and repair; a) Autonomous (and automated) launch abort and crew escape capability; b) Efficient testing and checkout of ground and flight systems; c) Monitoring and trending of ground and flight system operations and performance; d) Enhanced situational awareness and control for ground personnel and crew; e) Vehicle autonomy (self-sufficiency) in responding to off-nominal conditions during long-duration and distant exploration missions; f) In-space maintenance and repair; and g) Efficient ground processing of reusable systems. ISHM concepts and technologies may be applied to any complex engineered system such as transportation systems, orbital or planetary habitats, observatories, command and control systems, life support systems, safety-critical software, and even the health of flight crews. As an overarching design and operational principle implemented at the system-of-systems level, ISHM holds substantial promise in terms of affordability, safety, reliability, and effectiveness of space exploration missions.

  18. 48 CFR 352.234-1 - Notice of earned value management system-pre-award Integrated Baseline Review.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Notice of earned value management system-pre-award Integrated Baseline Review. 352.234-1 Section 352.234-1 Federal Acquisition... provision: Notice of Earned Value Management System—Pre-Award Integrated Baseline Review (October 2008) The...

  19. 48 CFR 352.234-2 - Notice of earned value management system-post-award Integrated Baseline Review.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Notice of earned value management system-post-award Integrated Baseline Review. 352.234-2 Section 352.234-2 Federal Acquisition... provision: Notice of Earned Value Management System—Post-Award Integrated Baseline Review (October 2008) (a...

  20. Teachers' Perceptions of the Integrated Quality Management System: Lessons from Mpumalanga, South Africa

    Science.gov (United States)

    Queen-Mary, Thobela Nozidumo; Mtapuri, Oliver

    2014-01-01

    This article examines the attitudes and perceptions of teachers regarding the implementation of the Integrated Quality Management System (IQMS). In doing so, it aims to contribute to the global discourse of change management in education. The system is intended to develop educators by enhancing their capabilities to inculcate a culture of teaching…

  1. Making alliances work -- Using a computer-based management system to integrate the supply chain

    International Nuclear Information System (INIS)

    Johnson, J.B.; Randolph, S.

    1995-01-01

    Traditionally, price has been king in the selection of suppliers and service companies in the upstream oil and gas market. Three years ago, Amoco began to question this selection practice and embarked on an extensive benchmarking effort that has led the company to a proven strategy for goods and services procurement called supply-chain management (SCM). However, the company found that managing compact, integrated supply chains is not always easy. Several implementation issues need to be reconciled for alliances to achieve their full bottom-line potential benefits consistently. Issues that must be resolved, whether they are called alliances, supply chains, or integrated services, are (1) whether these new working relationships are profitable for all the entities involved, from suppliers through to end users; (2) how to assess and improve risk management; (3) how to reduce total system costs; and (4) how to improve performance for each of the alliance members and for the alliance as a whole. This brief describes one possible solution to the complex issues involved in making alliances work: a computer-facilitated management system designed to integrate the work processes of different organizations. In the case described, the Drilling Management System (DMS) was developed and used by the Amoco (U.K.) Well Dept. The system uses off-the-shelf commercial software to improve the performance of the company's drilling operations by integrating the activities of the company and its suppliers

  2. Integrated Solution Support System for Water Management

    NARCIS (Netherlands)

    Kassahun, A.; Blind, M.; Krause, A.U.M.; Roosenschoon, O.R.

    2008-01-01

    Solving water management problems involves technical, social, economic, political and legal challenges and thus requires an integrated approach involving people from different backgrounds and roles. The integrated approach has been given a prominent role within the European Union¿s Water Framework

  3. Planning the future of JPL's management and administrative support systems around an integrated database

    Science.gov (United States)

    Ebersole, M. M.

    1983-01-01

    JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.

  4. Advanced safety management systems for maintenance of pipeline integrity

    International Nuclear Information System (INIS)

    Borysiewicz, M.; Potempski, S.

    2005-01-01

    One of the duties of the pipeline's operator is to introduce means for protection of human safety and the environment. This should be reflected in preparation of comprehensive Risk Management System with its key element Activity Programme for Management of Pipeline Integrity. In the paper such programme has been described taking into account law regulations and practical activities undertaken in technologically advanced countries (mainly USA and EU), where such solutions are implemented in routine operations. Possible solutions of realization of all elements of the programme, as well as information on utilization of computer aided support have been also included. (authors)

  5. Integrated Work Management: Overview, Course 31881

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-30

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

  6. Systems integration.

    Science.gov (United States)

    Siemieniuch, C E; Sinclair, M A

    2006-01-01

    The paper presents a view of systems integration, from an ergonomics/human factors perspective, emphasising the process of systems integration as is carried out by humans. The first section discusses some of the fundamental issues in systems integration, such as the significance of systems boundaries, systems lifecycle and systems entropy, issues arising from complexity, the implications of systems immortality, and so on. The next section outlines various generic processes for executing systems integration, to act as guides for practitioners. These address both the design of the system to be integrated and the preparation of the wider system in which the integration will occur. Then the next section outlines some of the human-specific issues that would need to be addressed in such processes; for example, indeterminacy and incompleteness, the prediction of human reliability, workload issues, extended situation awareness, and knowledge lifecycle management. For all of these, suggestions and further readings are proposed. Finally, the conclusions section reiterates in condensed form the major issues arising from the above.

  7. G189A analytical simulation of the RITE Integrated Waste Management-Water System

    Science.gov (United States)

    Coggi, J. V.; Clonts, S. E.

    1974-01-01

    This paper discusses the computer simulation of the Integrated Waste Management-Water System Using Radioisotopes for Thermal Energy (RITE) and applications of the simulation. Variations in the system temperature and flows due to particular operating conditions and variations in equipment heating loads imposed on the system were investigated with the computer program. The results were assessed from the standpoint of the computed dynamic characteristics of the system and the potential applications of the simulation to system development and vehicle integration.

  8. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  9. Integrated management of information inside maintenance processes. From the building registry to BIM systems

    Directory of Open Access Journals (Sweden)

    Cinzia Talamo

    2014-10-01

    Full Text Available The paper presents objec- tives, methods and results of two researches dealing with the improvement of integrated information management within maintenance processes. Focusing on information needs regarding the last phases of the building process, the two researches draft approaches characterizing a path of progressive improve- ment of strategies for integration: from a building registry, unique for the whole construction process, to an integrated management of the building process with the support of BIM systems.

  10. Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Farren Hunt

    2011-12-01

    Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

  11. MAST's Integrated Data Access Management system: IDAM

    International Nuclear Information System (INIS)

    Muir, D.G.; Appel, L.; Conway, N.J.; Kirk, A.; Martin, R.; Meyer, H.; Storrs, J.; Taylor, D.; Thomas-Davies, N.; Waterhouse, J.

    2008-01-01

    A new Integrated Data Access Management system, IDAM, has been created to address specific data management issues of the MAST spherical Tokamak. For example, this system enables access to numerous file formats, both legacy and modern (IDA, Ufile, netCDF, HDF5, MDSPlus, PPF, JPF). It adds data quality values at the signal level, and automatically corrects for problems in data: in timings, calibrations, and labelling. It also builds new signals from signal components. The IDAM data server uses a hybrid XML-relational database to record how data are accessed, whether locally or remotely, and how alias and generic signal names are mapped to true names. Also, XML documents are used to encode the details of data corrections, as well as definitions of composite signals and error models. The simple, user friendly, API and accessor function library, written in C on Linux, is available for applications in C, C++, IDL and Fortran-90/95/2003 with good performance: a MAST plasma current trace (28 kbytes of data), requested using a generic name and with data corrections applied, is delivered over a 100 Mbit/s network in ∼13 ms

  12. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 4 : use of knowledge integrated visual analytics system in supporting bridge management.

    Science.gov (United States)

    2009-12-01

    The goals of integration should be: Supporting domain oriented data analysis through the use of : knowledge augmented visual analytics system. In this project, we focus on: : Providing interactive data exploration for bridge managements. : ...

  13. Integrating Sustainable Development in Chemical Engineering Education: The Application of an Environmental Management System

    Science.gov (United States)

    Montanes, M. T.; Palomares, A. E.; Sanchez-Tovar, R.

    2012-01-01

    The principles of sustainable development have been integrated in chemical engineering education by means of an environmental management system. These principles have been introduced in the teaching laboratories where students perform their practical classes. In this paper, the implementation of the environmental management system, the problems…

  14. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  15. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  16. Innovative Integrated Management System (IIMS for Sustainable Food Industry

    Directory of Open Access Journals (Sweden)

    Suttiprasit Prasert

    2014-11-01

    Full Text Available It is evident that the long-term survival and growth of global food industry depend on the availability and efficient use of raw materials, energy and water and other facilities under the concept of sustainable practice, i.e. in environment, society and economics. Quality and safety managements are essential to ensure that the industry can continue to support the communities in which it operates. Awarding a number of certifications to show the high standing of international quality and hygiene characteristics are currently necessary, e.g. ISO 9001: 2000, GMP/GHP, HACCP, ISO 22000, BRC and etc. To minimize the cost and maximize the efficiency, the Innovative Integration Management System (IIMS has been implemented effectively under the frameworks of sustainability in a numbers of national and international food production companies in Thailand during the past years. This will allow the organization to integrate all common processes such as management review, document control, record control, training, monitoring & measuring, data analysing, internal audits, and corrective and preventive actions whereas the critical or specific processes required by each standard are still retained harmoniously with the others.

  17. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  18. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    SETH, S.S.

    2000-01-10

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system.

  19. Gulf of Mexico Integrated Science - Tampa Bay Study - Data Information Management System (DIMS)

    Science.gov (United States)

    Johnston, James

    2004-01-01

    The Tampa Bay Integrated Science Study is an effort by the U.S. Geological Survey (USGS) that combines the expertise of federal, state and local partners to address some of the most pressing ecological problems of the Tampa Bay estuary. This project serves as a template for the application of integrated research projects in other estuaries in the Gulf of Mexico. Efficient information and data distribution for the Tampa Bay Study has required the development of a Data Information Management System (DIMS). This information system is being used as an outreach management tool, providing information to scientists, decision makers and the public on the coastal resources of the Gulf of Mexico.

  20. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    International Nuclear Information System (INIS)

    Joyner, William Scott; Knight, Mark A.

    2013-01-01

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information

  1. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    Energy Technology Data Exchange (ETDEWEB)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  2. Risk and integrity management system for PETRONAS Gas Berhad's gas and liquid hydrocarbon pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Khalid, Tuan Hj. Ahmad Nadzri bin; Nasir, Osman; Napiah, Mohd Nazmi Mohd Ali [PETRONAS Gas Berhad, Johor (Malaysia); Choong, Evelyn

    2005-07-01

    PETRONAS Gas Berhad (PGB), Malaysia currently operates one of Southeast Asia's largest onshore pipeline systems comprising more than 2,500 km of large diameter high pressure gas and liquid transmission, supply and lateral pipelines. Recognizing the value of a risk based approach to pipeline integrity management program, in 2002 PGB implemented a customized and fully integrated Risk and Integrity Management System (RIMS) which included software modules for: data management; semi-quantitative risk assessment; risk control cost benefit analyses; defect assessment; corrosion growth modeling; and reporting. As part of this project, a benchmarking study performed jointly with the contractor, PGB's pipeline integrity programs were also compared with a broad group of international pipeline operators. This study compared the relative ranking position of PGB pre- and post implementation of RIMS. It demonstrated that implementation of RIMS places PGB in a select group of first quartile international pipeline operators, with respect to the implementation of pipeline integrity management best practice. This paper describes the functionalities of RIMS system and how it has benefited PGB, which have been realized to date from its implementation. (author)

  3. An Integrated Cyber Security Risk Management Approach for a Cyber-Physical System

    Directory of Open Access Journals (Sweden)

    Halima Ibrahim Kure

    2018-05-01

    Full Text Available A cyber-physical system (CPS is a combination of physical system components with cyber capabilities that have a very tight interconnectivity. CPS is a widely used technology in many applications, including electric power systems, communications, and transportation, and healthcare systems. These are critical national infrastructures. Cybersecurity attack is one of the major threats for a CPS because of many reasons, including complexity and interdependencies among various system components, integration of communication, computing, and control technology. Cybersecurity attacks may lead to various risks affecting the critical infrastructure business continuity, including degradation of production and performance, unavailability of critical services, and violation of the regulation. Managing cybersecurity risks is very important to protect CPS. However, risk management is challenging due to the inherent complex and evolving nature of the CPS system and recent attack trends. This paper presents an integrated cybersecurity risk management framework to assess and manage the risks in a proactive manner. Our work follows the existing risk management practice and standard and considers risks from the stakeholder model, cyber, and physical system components along with their dependencies. The approach enables identification of critical CPS assets and assesses the impact of vulnerabilities that affect the assets. It also presents a cybersecurity attack scenario that incorporates a cascading effect of threats and vulnerabilities to the assets. The attack model helps to determine the appropriate risk levels and their corresponding mitigation process. We present a power grid system to illustrate the applicability of our work. The result suggests that risk in a CPS of a critical infrastructure depends mainly on cyber-physical attack scenarios and the context of the organization. The involved risks in the studied context are both from the technical and

  4. An Innovative Approach to the Integrated Management System Development: SIMPRO-IMS Web Based Environment

    Directory of Open Access Journals (Sweden)

    Kristina Zgodavova

    2012-12-01

    Full Text Available The purpose of this paper is to contribute to learning, knowledge creation and knowledge transfer for building organization innovability by integrating the management systems in the SIMPRO-IMS web based environment. The paper content consists of the interpretation of role-play simulation, role-play simulation process description, methodology, and the employment of role-play simulation outcomes, as well as the discussion of the knowledge thus obtained. Primary the model of the SIMPRO-Q education environment has been developed and tested during a period of 15 years in several industrial organizations as well as service organizations such as Higher Education Institution (HEI and Healthcare Organization (HCO. The newest version SIMPRO-IMS has recently been developed to support a need of integration of management systems and information archiving. With the last development, SIMPRO-IMS web based environment, processes of five ISO systems are integrated for parallel development, implementation, auditing, maintaining and leading. SIMPRO-IMS provides management with the apparatus necessary to realize a systematic and verifiable approach to the creation and control of IMS documentation. At the same time contributes to the preservation of organization memory in response to the growing challenges of globalization and digitalization. The research is limited by the complexity of a real system and possible empiric results verification. The results achieved are verified when people really overcome the resistance to change. This can be assessed thoughtfully only after some period of time. Another limitation is presented by measurability of real enhancement achieved in quality, safety and environmentality of production, and business continuity and social responsibility of an organization. Development and progress in the methodology of SIMPRO-IMS web based environment is encoded in upgrading the SIMPRO database by processes of the environmental management

  5. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  6. SymptomCare@Home: Developing an Integrated Symptom Monitoring and Management System for Outpatients Receiving Chemotherapy.

    Science.gov (United States)

    Beck, Susan L; Eaton, Linda H; Echeverria, Christina; Mooney, Kathi H

    2017-10-01

    SymptomCare@Home, an integrated symptom monitoring and management system, was designed as part of randomized clinical trials to help patients with cancer who receive chemotherapy in ambulatory clinics and often experience significant symptoms at home. An iterative design process was informed by chronic disease management theory and features of assessment and clinical decision support systems used in other diseases. Key stakeholders participated in the design process: nurse scientists, clinical experts, bioinformatics experts, and computer programmers. Especially important was input from end users, patients, and nurse practitioners participating in a series of studies testing the system. The system includes both a patient and clinician interface and fully integrates two electronic subsystems: a telephone computer-linked interactive voice response system and a Web-based Decision Support-Symptom Management System. Key features include (1) daily symptom monitoring, (2) self-management coaching, (3) alerting, and (4) nurse practitioner follow-up. The nurse practitioner is distinctively positioned to provide assessment, education, support, and pharmacologic and nonpharmacologic interventions to intensify management of poorly controlled symptoms at home. SymptomCare@Home is a model for providing telehealth. The system facilitates using evidence-based guidelines as part of a comprehensive symptom management approach. The design process and system features can be applied to other diseases and conditions.

  7. Data Distribution System (DDS) and Solar Dynamic Observatory Ground Station (SDOGS) Integration Manager

    Science.gov (United States)

    Pham, Kim; Bialas, Thomas

    2012-01-01

    The DDS SDOGS Integration Manager (DSIM) provides translation between native control and status formats for systems within DDS and SDOGS, and the ASIST (Advanced Spacecraft Integration and System Test) control environment in the SDO MOC (Solar Dynamics Observatory Mission Operations Center). This system was created in response for a need to centralize remote monitor and control of SDO Ground Station equipments using ASIST control environment in SDO MOC, and to have configurable table definition for equipment. It provides translation of status and monitoring information from the native systems into ASIST-readable format to display on pages in the MOC. The manager is lightweight, user friendly, and efficient. It allows data trending, correlation, and storing. It allows using ASIST as common interface for remote monitor and control of heterogeneous equipments. It also provides failover capability to back up machines.

  8. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    Energy Technology Data Exchange (ETDEWEB)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  9. Physician practice management companies: implications for hospital-based integrated delivery systems.

    Science.gov (United States)

    Burns, L R; Robinson, J C

    1997-01-01

    Physician practice management companies (PPMCs) are one of the most visible entrants into the industry of managing physician practices, and anywhere from 100-150 are already in operation. Although PPMCs and hospital-based integrated delivery systems (IDSs) differ from each other in many ways, they share a number of common features, including the pursuit of capitation contracts from payors. As a result, PPMCs pose a growing, direct threat to hospital systems in competing for managed care contracts that cover physician service. PPMCs also provide an alternative to hospital-based IDSs at the local market level for physician group consolidation. This article looks at the structure, operation, and strategy of PPMCs and examines what implications their growth will have for hospital-based IDSs.

  10. Methods of internal control in integrated management accounting system of the enterprise

    Directory of Open Access Journals (Sweden)

    Shevelev A.E.

    2017-01-01

    Full Text Available The purpose of internal control procedure of material and information flows is expression of independent opinion about accounting of material and information flows of the organization, development of recommendations about elimination of detected violations and preparing data to implement automated management accounting system, based on integrated system. Internal control procedure of material and information flows in the enterprise can solve complex of problems about identifying deficiencies in accounting, searching for reserves using information resources, identifying opportunities for implementation of automated management accounting system at the enterprise. Internal control was planned and conducted thus to argue that management statements are free of misstatement, and information flows provide required operability of the entire system. Internal control was carried out on a sample basis and included examining, on a test basis evidence supporting the amounts and disclosures in management reports. The disclosure of information about innovative activities, assessment of compliance with the principles and rules of accounting used in the preparation of management reporting, the review of key performance indicators, as well as evaluating the presentation of management reports are presented.

  11. A Multi-Agent Based Energy Management Solution for Integrated Buildings and Microgrid System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Rahimi-Kian, Ashkan; Mirian, Maryam S.

    2017-01-01

    -reflex to complex learning agents are designed and implemented to cooperate with each other to reach an optimal operating strategy for the mentioned integrated energy system (IES) while meeting the system’s objectives and related constraints. The optimization process for the EMS is defined as a coordinated......In this paper, an ontology-driven multi-agent based energy management system (EMS) is proposed for monitoring and optimal control of an integrated homes/buildings and microgrid system with various renewable energy resources (RESs) and controllable loads. Different agents ranging from simple...... distributed generation (DG) and demand response (DR) management problem within the studied environment and is solved by the proposed agent-based approach utilizing cooperation and communication among decision agents. To verify the effectiveness and applicability of the proposed multi-agent based EMS, several...

  12. Integrated Management System as a base for customer satisfaction

    International Nuclear Information System (INIS)

    Grabelnikov, Konstantin V.

    2012-01-01

    In this article JSC NCCP integrated management system procedures is presented. Unique possibility to collect different Customers Voices, based on different organisation culture and approaches, to improve the technological process, design of nuclear fuel, quality control methods and instrumentation is presented. As a result of the mutual efforts we have stable and valuable decreasing of leaking FA at NPP of our Customers. And, with other hand, we have stable and valuable increasing of Customer Satisfaction Level

  13. Influence of integrated quality management system on processing management in management and production staff’s opinion in Strauss Cafe Poland Ltd Company

    Directory of Open Access Journals (Sweden)

    Justyna Górna

    2009-01-01

    Full Text Available In the article are presented the results of the research determining the influence of the integrated quality management system on management process in the assessment of management and regular employees of Strauss Cafe Poland Ltd. According to the ISO 9001 requirements in order to effectively manage the organisation, should identify operations. The activities requiring resources and managed in order to enable the transformation of inflow into outflow should be evaluated as a process. The analysis of the gathered data shows the essential influence of the systems (QMS and HACCP on the management process in the company. The management staff emphasized the significant influence of the quality management system whereas production staff of HACCP system. Both of these groups of employees in the survey shows the beurocracy as a negative result of these systems, while positive results are improvement of image of the company and increase of both products and services quality.

  14. SUPPORT OF QUALITY MANAGEMENT SYSTEM AND BALANCED SCORECARD IN THE INTEGRATION OF NORMATIVE, STRATEGIC AND OPERATIONAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2012-12-01

    Full Text Available Taking into consideration the problems of strategy implementation, as well as problems of external adaptation and internal integration in the enterprise, through the prism of the application of advanced management concepts, primarily - the quality management system (QMS and the balanced scorecard (BSC, leads to the opportunity to increase the integration of organizational levels of decision making and management. Understanding the support of the QMS and BSC in relationship coordination - business strategy, organizational structure and culture, is reflected in the integration and process management dimensions: 1 the existence of a hierarchical order of the strategic actions (from vision and mission, to strategy and objectives, to key success factors and key performance indicators, 2 action of various coordination mechanisms, formalization and standardization of the organizational structure and process and 3 consistent understanding and values of members of the organization, which provides efficient control of behavior, coordination and implementation of policy and company goals. Implementation of concepts of QMS and BSC will provide greater compatibility and coherence of the normative, strategic and operational management, which will lead to more successful business, enterprise development and the satisfaction of all stakeholders.

  15. Integrated Quality Management System in Public Urban Traffic

    Directory of Open Access Journals (Sweden)

    Husein Pašagić

    2005-09-01

    Full Text Available Public urban traffic (PUT requirements are based on thespecific characteristics that dictate the requirements themselves.The problems faced by all the big cities regarding public urbantransport are very similar, and they range from unacceptabilityof the very organisational structure of the system facing the populationgrowth, limitations and congestions of the traffic routesloaded by an increasing number of automobiles, to the chroniclack of economic funds for the investments that would createthe necessary conditions for positive shifts. In PUT there aremany random parameters whose statistical laws are not easy todetermine and it is often the topic of research of various profilesof scientists. There is always the satisfaction, that is, the lack ofsatisfaction by the final user of the public urban transport andall the other involved groups. The result is that the potential usersof public urban transport give up and try to find other solutionsfor their transport needs, turning in principle to individualtraffic. Consequently, the number of passenger cars on the trafficroutes increases along with all the resulting negative effects.The complex systems of public urban transport facing the increasingrequirements to improve efficiency have to be subjectedto certain changes in order to achieve physical sustainability oftraffic at all, and to satisfy the environmental requirements thatoccur as counterbalance to the pollution of the urban area.With the aim of achieving optimal conditions for the qualityof service, and by introducing acceptable traffic solutionscombined with the integrated quality management systembased on the standards ISO 9001 and ISO 14000 high-qualityshifts are made possible. The integration of these standards resultsin the rational combining of the quality management systeminto a single efficient system, reflected in achieving high-quality traffic and transport service, improved informationflow, unique documentation, positive

  16. DISCO - A concept of a system for integrated data base management in distributed data processing systems

    International Nuclear Information System (INIS)

    Holler, E.

    1980-01-01

    The development in data processing technology favors the trend towards distributed data processing systems: The large-scale integration of semiconductor devices has lead to very efficient (approx. 10 6 operations per second) and relatively cheap low end computers being offered today, that allow to install distributed data processing systems with a total capacity coming near to that of large-scale data processing plants at a tolerable investment expenditure. The technologies of communication and data banks, each by itself, have reached a state of development justifying their routine application. This is made evident by the present efforts for standardization in both areas. The integration of both technologies in the development of systems for integrated distributed data bank management, however, is new territory for engineering. (orig.) [de

  17. Integrated Safety, Environmental and Emergency Management System (ISEEMS)

    International Nuclear Information System (INIS)

    Silver, R.; Langwell, G.; Thomas, C.; Coffing, S.

    1996-01-01

    The Risk Management and NEPA (National Environmental Policy Act) Department of Sandia National Laboratories/New Mexico (SNL/NM) recognized the need for hazard and environmental data analysis and management to support the line managers' need to know, understand, manage and document the hazards in their facilities and activities. The Integrated Safety, Environmental, and Emergency Management System (ISEEMS) was developed in response to this need. SNL needed a process that would quickly and easily determine if a facility or project activity contained only standard industrial hazards and therefore require minimal safety documentation, or if non-standard industrial hazards existed which would require more extensive analysis and documentation. Many facilities and project activities at SNL would benefit from the quick screening process used in ISEEMS. In addition, a process was needed that would expedite the NEPA process. ISEEMS takes advantage of the fact that there is some information needed for the NEPA process that is also needed for the safety documentation process. The ISEEMS process enables SNL line organizations to identify and manage hazards and environmental concerns at a level of effort commensurate with the hazards themselves by adopting a necessary and sufficient (graded) approach to compliance. All hazard-related information contained within ISEEMS is location based and can be displayed using on-line maps and building floor plans. This visual representation provides for quick assimilation and analysis

  18. Integrated management systems and workflow-based electronic document management: An empirical study

    Directory of Open Access Journals (Sweden)

    Hang Thu Pho

    2014-01-01

    Full Text Available Purpose: Many global organizations have aligned their strategy and operation via the ISO-based framework of integrated management system (IMS that allows them to merge quality, environment, health and safety management systems. In such context, having a robust electronic document management system (EDMS is essential, especially at global enterprises where a large amount of documents generated by processes flows through different work cultures. However, there is no "one-size-fits-all" design for EDMS because it depends on organizations' needs, size and resource allocation. This article discusses the interrelation between EDMS and IMS in order to suggest a best practice. Design/methodology/approach: This article methodologically based upon a qualitative, interpretivistic, longitudinal empirical study in a wind turbine factory. Findings and Originality/value: IMS improvement and effectiveness has been overlooking EDMS as a key factor in establishing appropriate technological support of the IMS processes. Rightful application of EDMS can further contribute to organizational learning, precision of documentation and cross-organisational collaboration. Research limitations/implications: Theorising on IMS needs a stronger perspective of the technological limitations and potentials of basing IMS on EDMS. Practical implications: IMS are complex systems involving a large number of administrative functions. EDMS provides a formal representation with automation potentials both heightening and securing document trustworthiness. Social implications: IMS has a tendency to stay with professionals, e.g. line managers and QA/QC/QMS professionals. The EDMS line of discussion suggests a broader inclusion. Originality/value: Researching IMS as a technological implementation is giving a better platform of aligning the IMS with other business processes and is bringing IMS closer to the operational activities within the enterprise.

  19. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 and 2

    International Nuclear Information System (INIS)

    SETH, S.S.

    2000-01-01

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system

  20. Department of Energy environmental management complex-wide integration using systems engineering

    International Nuclear Information System (INIS)

    Fairbourn, P.

    1997-01-01

    A systems engineering approach was successfully used to recommend changes to environmental management activities across the DOE Complex. A team of technical experts and systems engineers developed alternatives that could save tax payers billions of dollars if the barriers are removed to allow complete implementation. The alternatives are technically-based and defensible, and are being worked through the stakeholder review process. The integration process and implementing project structure are both discussed

  1. Integration of the enterprise electronic health record and anesthesia information management systems.

    Science.gov (United States)

    Springman, Scott R

    2011-09-01

    Fewer than 5% of anesthesia departments use an electronic medical record (EMR) that is anesthesia specific. Many anesthesia information management systems (AIMS) have been developed with a focus only on the unique needs of anesthesia providers, without being fully integrated into other electronic health record components of the entire enterprise medical system. To understand why anesthesia providers should embrace health information technology (HIT) on a health system-wide basis, this article reviews recent HIT history and reviews HIT concepts. The author explores current developments in efforts to expand enterprise HIT, and the pros and cons of full enterprise integration with an AIMS. Copyright © 2011 Elsevier Inc. All rights reserved.

  2. Idaho National Laboratory Integrated Safety Management System 2010 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Haney

    2010-12-01

    Idaho National Laboratory completes an annual Integrated Safety Management System effectiveness review per 48 CFR 970.5223-1 “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assesses ISMS effectiveness, provides feedback to maintain system integrity, and helps identify target areas for focused improvements and assessments for the following year. Using one of the three Department of Energy (DOE) descriptors in DOE M 450.4-1 regarding the state of ISMS effectiveness during Fiscal Year (FY) 2010, the information presented in this review shows that INL achieved “Effective Performance.”

  3. An integrated photogrammetric and spatial database management system for producing fully structured data using aerial and remote sensing images.

    Science.gov (United States)

    Ahmadi, Farshid Farnood; Ebadi, Hamid

    2009-01-01

    3D spatial data acquired from aerial and remote sensing images by photogrammetric techniques is one of the most accurate and economic data sources for GIS, map production, and spatial data updating. However, there are still many problems concerning storage, structuring and appropriate management of spatial data obtained using these techniques. According to the capabilities of spatial database management systems (SDBMSs); direct integration of photogrammetric and spatial database management systems can save time and cost of producing and updating digital maps. This integration is accomplished by replacing digital maps with a single spatial database. Applying spatial databases overcomes the problem of managing spatial and attributes data in a coupled approach. This management approach is one of the main problems in GISs for using map products of photogrammetric workstations. Also by the means of these integrated systems, providing structured spatial data, based on OGC (Open GIS Consortium) standards and topological relations between different feature classes, is possible at the time of feature digitizing process. In this paper, the integration of photogrammetric systems and SDBMSs is evaluated. Then, different levels of integration are described. Finally design, implementation and test of a software package called Integrated Photogrammetric and Oracle Spatial Systems (IPOSS) is presented.

  4. An Integrated Photogrammetric and Spatial Database Management System for Producing Fully Structured Data Using Aerial and Remote Sensing Images

    Directory of Open Access Journals (Sweden)

    Farshid Farnood Ahmadi

    2009-03-01

    Full Text Available 3D spatial data acquired from aerial and remote sensing images by photogrammetric techniques is one of the most accurate and economic data sources for GIS, map production, and spatial data updating. However, there are still many problems concerning storage, structuring and appropriate management of spatial data obtained using these techniques. According to the capabilities of spatial database management systems (SDBMSs; direct integration of photogrammetric and spatial database management systems can save time and cost of producing and updating digital maps. This integration is accomplished by replacing digital maps with a single spatial database. Applying spatial databases overcomes the problem of managing spatial and attributes data in a coupled approach. This management approach is one of the main problems in GISs for using map products of photogrammetric workstations. Also by the means of these integrated systems, providing structured spatial data, based on OGC (Open GIS Consortium standards and topological relations between different feature classes, is possible at the time of feature digitizing process. In this paper, the integration of photogrammetric systems and SDBMSs is evaluated. Then, different levels of integration are described. Finally design, implementation and test of a software package called Integrated Photogrammetric and Oracle Spatial Systems (IPOSS is presented.

  5. Integrated waste management - Looking beyond the solid waste horizon

    International Nuclear Information System (INIS)

    Seadon, J.K.

    2006-01-01

    Waste as a management issue has been evident for over four millennia. Disposal of waste to the biosphere has given way to thinking about, and trying to implement, an integrated waste management approach. In 1996 the United Nations Environmental Programme (UNEP) defined 'integrated waste management' as 'a framework of reference for designing and implementing new waste management systems and for analysing and optimising existing systems'. In this paper the concept of integrated waste management as defined by UNEP is considered, along with the parameters that constitute integrated waste management. The examples used are put into four categories: (1) integration within a single medium (solid, aqueous or atmospheric wastes) by considering alternative waste management options (2) multi-media integration (solid, aqueous, atmospheric and energy wastes) by considering waste management options that can be applied to more than one medium (3) tools (regulatory, economic, voluntary and informational) and (4) agents (governmental bodies (local and national), businesses and the community). This evaluation allows guidelines for enhancing success: (1) as experience increases, it is possible to deal with a greater complexity; and (2) integrated waste management requires a holistic approach, which encompasses a life cycle understanding of products and services. This in turn requires different specialisms to be involved in the instigation and analysis of an integrated waste management system. Taken together these advance the path to sustainability

  6. An Integrated Web-based Decision Support System in Disaster Risk Management

    Science.gov (United States)

    Aye, Z. C.; Jaboyedoff, M.; Derron, M. H.

    2012-04-01

    Nowadays, web based decision support systems (DSS) play an essential role in disaster risk management because of their supporting abilities which help the decision makers to improve their performances and make better decisions without needing to solve complex problems while reducing human resources and time. Since the decision making process is one of the main factors which highly influence the damages and losses of society, it is extremely important to make right decisions at right time by combining available risk information with advanced web technology of Geographic Information System (GIS) and Decision Support System (DSS). This paper presents an integrated web-based decision support system (DSS) of how to use risk information in risk management efficiently and effectively while highlighting the importance of a decision support system in the field of risk reduction. Beyond the conventional systems, it provides the users to define their own strategies starting from risk identification to the risk reduction, which leads to an integrated approach in risk management. In addition, it also considers the complexity of changing environment from different perspectives and sectors with diverse stakeholders' involvement in the development process. The aim of this platform is to contribute a part towards the natural hazards and geosciences society by developing an open-source web platform where the users can analyze risk profiles and make decisions by performing cost benefit analysis, Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) with the support of others tools and resources provided. There are different access rights to the system depending on the user profiles and their responsibilities. The system is still under development and the current version provides maps viewing, basic GIS functionality, assessment of important infrastructures (e.g. bridge, hospital, etc.) affected by landslides and visualization of the impact

  7. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  8. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  9. Roots Air Management System with Integrated Expander

    Energy Technology Data Exchange (ETDEWEB)

    Stretch, Dale [Eaton Corporation, Menomonee Falls, WI (United States); Wright, Brad [Eaton Corporation, Menomonee Falls, WI (United States); Fortini, Matt [Eaton Corporation, Menomonee Falls, WI (United States); Fink, Neal [Ballard Power Systems, Burnaby, BC (Canada); Ramadan, Bassem [Kettering Univ., Flint, MI (United States); Eybergen, William [Eaton Corporation, Menomonee Falls, WI (United States)

    2016-07-06

    PEM fuel cells remain an emerging technology in the vehicle market with several cost and reliability challenges that must be overcome in order to increase market penetration and acceptance. The DOE has identified the lack of a cost effective, reliable, and efficient air supply system that meets the operational requirements of a pressurized PEM 80kW fuel cell as one of the major technological barriers that must be overcome. This project leveraged Roots positive displacement development advancements and demonstrated an efficient and low cost fuel cell air management system. Eaton built upon its P-Series Roots positive displacement design and shifted the peak efficiency making it ideal for use on an 80kW PEM stack. Advantages to this solution include: • Lower speed of the Roots device eliminates complex air bearings present on other systems. • Broad efficiency map of Roots based systems provides an overall higher drive cycle fuel economy. • Core Roots technology has been developed and validated for other transportation applications. Eaton modified their novel R340 Twin Vortices Series (TVS) Roots-type supercharger for this application. The TVS delivers more power and better fuel economy in a smaller package as compared to other supercharger technologies. By properly matching the helix angle with the rotor’s physical aspect ratio, the supercharger’s peak efficiency can be moved to the operating range where it is most beneficial for the application. The compressor was designed to meet the 90 g/s flow at a pressure ratio of 2.5, similar in design to the P-Series 340. A net shape plastic expander housing with integrated motor and compressor was developed to significantly reduce the cost of the system. This integrated design reduced part count by incorporating an overhung expander and motor rotors into the design such that only four bearings and two shafts were utilized.

  10. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  11. US Department of Energy, Richland Operations Office Integrated Safety Management System Program Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight

  12. Development of integrated analytical data management system

    International Nuclear Information System (INIS)

    Onishi, Koichi; Wachi, Isamu; Hiroki, Toshio

    1986-01-01

    The Analysis Subsection of Technical Service Section, Tokai Reprocessing Plant, Tokai Works, is engaged in analysis activities required for the management of processes and measurements in the plant. Currently, it has been desired to increase the reliability of analytical data and to perform analyses more rapidly to cope with the increasing number of analysis works. To meet this end, on-line data processing has been promoted and advanced analytical equipment has been introduced in order to enhance automization. In the present study, an integrated analytical data mangement system is developed which serves for improvement of reliability of analytical data as well as for rapid retrieval and automatic compilation of these data. Fabrication of a basic model of the system has been nearly completed and test operation has already been started. In selecting hardware to be used, examinations were made on easiness of system extension, Japanese language processing function for improving man-machine interface, large-capacity auxiliary memory system, and data base processing function. The existing analysis works wer reviewed in establishing the basic design of the system. According to this basic design, the system can perform such works as analysis of application slips received from clients as well as recording, sending, filing and retrieval of analysis results. (Nogami, K.)

  13. NED-2: a decision support system for integrated forest ecosystem management

    Science.gov (United States)

    Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman

    2005-01-01

    NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...

  14. Integrated Energy & Emission Management for Heavy-Duty Diesel Engines with Waste Heat Recovery System

    NARCIS (Netherlands)

    Willems, F.P.T.; Kupper, F.; Cloudt, R.P.M.

    2012-01-01

    This study presents an integrated energy and emission management strategy for an Euro-VI diesel engine with Waste Heat Recovery (WHR) system. This Integrated Powertrain Control (IPC) strategy optimizes the CO2-NOx trade-off by minimizing the operational costs associated with fuel and AdBlue

  15. A Novel Silicon Micromachined Integrated MCM Thermal Management System

    Science.gov (United States)

    Kazmierczak, M. J.; Henderson, H. T.; Gerner, F. M.

    1997-01-01

    "Micromachining" is a chemical means of etching three-dimensional structures, typically in single- crystalline silicon. These techniques are leading toward what is coming to be referred to as MEMS (Micro Electro Mechanical Systems), where in addition to the ordinary two-dimensional (planar) microelectronics, it is possible to build three-dimensional n-ticromotors, electrically- actuated raicrovalves, hydraulic systems and much more on the same microchip. These techniques become possible because of differential etching rates of various crystallographic planes and materials used for semiconductor n-ticrofabfication. The University of Cincinnati group in collaboration with Karl Baker at NASA Lewis were the first to form micro heat pipes in silicon by the above techniques. Current work now in progress using MEMS technology is now directed towards the development of the next generation in MCM (Multi Chip Module) packaging. Here we propose to develop a complete electronic thermal management system which will allow densifica6on in chip stacking by perhaps two orders of magnitude. Furthermore the proposed technique will allow ordinary conu-nercial integrated chips to be utilized. Basically, the new technique involves etching square holes into a silicon substrate and then inserting and bonding commercially available integrated chips into these holes. For example, over a 100 1/4 in. by 1 /4 in. integrated chips can be placed on a 4 in. by 4 in. silicon substrate to form a Multi-Chip Module (MCM). Placing these MCM's in-line within an integrated rack then allows for three-diniensional stacking. Increased miniaturization of microelectronic circuits will lead to very high local heat fluxes. A high performance thermal management system will be specifically designed to remove the generated energy. More specifically, a compact heat exchanger with milli / microchannels will be developed and tested to remove the heat through the back side of this MCM assembly for moderate and high

  16. Migration of the Almaraz NPP integrated operation management system to a new computer platform

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    1996-01-01

    In all power plants, it becomes necessary, with the passage of time, to migrate the initial operation management systems to adapt them to current technologies. That is a good time to improve the inclusion of data in the corporative database and standardize the system interfaces and operation, whilst maintaining data system operability. This article contains Almaraz experience in migrating its Integrated Operation Management System to an advanced computer platform based on open systems (UNIX), communications network (ETHERNET) and database (ORACLE). To this effect, clear objectives and strict standards were established to facilitate the work. The most noteworthy results obtained are: Better quality of information and structure in the corporative database Standardised user interface in all applications. Joint migration of applications for Maintenance, Components and Spare parts, Warehouses and Purchases. Integration of new applications into the system. Introduction of the navigator, which allows movement around the database using all available applications. (Author)

  17. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  18. Integration of scanned document management with the anatomic pathology laboratory information system: analysis of benefits.

    Science.gov (United States)

    Schmidt, Rodney A; Simmons, Kim; Grimm, Erin E; Middlebrooks, Michael; Changchien, Rosy

    2006-11-01

    Electronic document management systems (EDMSs) have the potential to improve the efficiency of anatomic pathology laboratories. We implemented a novel but simple EDMS for scanned documents as part of our laboratory information system (AP-LIS) and collected cost-benefit data with the intention of discerning the value of such a system in general and whether integration with the AP-LIS is advantageous. We found that the direct financial benefits are modest but the indirect and intangible benefits are large. Benefits of time savings and access to data particularly accrued to pathologists and residents (3.8 h/d saved for 26 pathologists and residents). Integrating the scanned document management system (SDMS) into the AP-LIS has major advantages in terms of workflow and overall simplicity. This simple, integrated SDMS is an excellent value in a practice like ours, and many of the benefits likely apply in other practice settings.

  19. Lean environmental management integration system for sustainability of ISO 14001:2004 standard implementation

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2014-10-01

    Full Text Available Purpose: The purpose of this study is to present a model for integrating Lean Principles with ISO 14001 Environmental Management System.Design/methodology/approach: To achieve the objective of the study, the methodology used in this study is based on preliminary literature review of ISO 14001 standards and Lean Principles as well as certain case reports from various proponents and authors of ISO 14001 and Lean as noted in various articles and journals and some books.Findings and Originality/value: The findings of this study are a new model called Lean Environmental Management Integration System (LEMIS has been developed and leads to the creation of these measurement standards for evaluating the organization, making its environmental efforts more realistic, focused and attainable.Research limitations/implications: Future research should be conducted case studies in this direction are required to be conducted for examining the feasibility of amalgamation and implementing ISO 14001:2004 standards with the philosophy of Lean Principles to enable the achievement of world class standards.Practical implications: This model helps to eliminate any wasteful processes in the organization’s implementation of the ISO 14001 standard thus leading to higher environmental performance.  Integrating the standard with Lean principles through LEMIS model helps to specify these performance measures making the standard achieve sustainability and continual improvement.Originality/value: This study presents a unique approach of integrating the two main models, namely Lean Principles and ISO 14001 Environmental Management System, as a single framework benefiting contemporary organizations.

  20. Multidisciplinary management--an opportunity for service integration.

    Science.gov (United States)

    Cameron, M

    1997-01-01

    The management team of the future will enter an environment requiring facilitation, participation, clinical, and empowerment skills. Those individuals who possess a clinical orientation as well as business expertise will be sought to manage multidisciplinary units. The rapid changes in the health-care environment have forced organizations to restructure their operations. To achieve quality care, customer satisfaction, cost-effectiveness, and efficiency, service integration across the organization will be required. As we approach the 21st century, this standard will evolve until "all levels are managing patient care." Some of the restructuring trends occurring in the health-care industry have been collaboration service integration, management consolidation, and job elimination. The emphasis for the multidisciplinary manager of the future will include integrating the professional and clinical services, managing information, building community partnerships, promoting physician collaboration, and managing the change process. A model organization in the next century will move toward a people-oriented system with inclusion and empowerment initiatives. Service integration will affect all organizations, but the disciplines within the Clinical Support System will be the most affected. Future opportunities of leadership will exist for pathologists, nurses, or medical technologists as the professional silos of managers and clinicians continue to crumble.

  1. [The Development of Information Centralization and Management Integration System for Monitors Based on Wireless Sensor Network].

    Science.gov (United States)

    Xu, Xiu; Zhang, Honglei; Li, Yiming; Li, Bin

    2015-07-01

    Developed the information centralization and management integration system for monitors of different brands and models with wireless sensor network technologies such as wireless location and wireless communication, based on the existing wireless network. With adaptive implementation and low cost, the system which possesses the advantages of real-time, efficiency and elaboration is able to collect status and data of the monitors, locate the monitors, and provide services with web server, video server and locating server via local network. Using an intranet computer, the clinical and device management staffs can access the status and parameters of monitors. Applications of this system provide convenience and save human resource for clinical departments, as well as promote the efficiency, accuracy and elaboration for the device management. The successful achievement of this system provides solution for integrated and elaborated management of the mobile devices including ventilator and infusion pump.

  2. Integrated systems of weed management in organic transplated vidalia sweet onion production

    Science.gov (United States)

    Field experiments were conducted from 2008 through 2010 near Lyons, GA to develop integrated weed management systems for organic Vidalia® sweet onion production. Treatments were a factorial arrangement of summer solarization, cultivation with a tine weeder, and a clove oil herbicide. Plots were so...

  3. PENATAAN RUANG LAUT BERDASARKAN INTEGRATED COASTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dina Sunyowati

    2008-10-01

    Full Text Available The planning of coastal spatial arrangement must be put in the valid spatial planning system. Law Number 26 of 2007 on Spatial Planning and it is in fact related with land spatial planning, although that ocean and air spatial management will be arranged in separate law. The legal for coastal zone management is determined by using the principles of integrated coastal management by focusing on area or zone authority system. The integrated of coastal zones management regulations should be followed by the planning of coastal spatial arrange­ment. Therefore, certain synchronization at coastal zones governance is very important issue since by integrating and coordinating other related regulations and therefore conflict of norm can be minimized in the spatial planning coastal zone.

  4. Dynamic management of integrated residential energy systems

    Science.gov (United States)

    Muratori, Matteo

    dissertation presents a bottom-up highly resolved model of a generic residential energy eco-system in the United States. The model is able to capture the entire energy footprint of an individual household, to include all appliances, space conditioning systems, in-home charging of plug-in electric vehicles, and any other energy needs, viewing residential and transportation energy needs as an integrated continuum. The residential energy eco-system model is based on a novel bottom-up approach that quantifies consumer energy use behavior. The incorporation of stochastic consumer behaviors allows capturing the electricity consumption of each residential specific end-use, providing an accurate estimation of the actual amount of available controllable resources, and for a better understanding of the potential of residential demand response programs. A dynamic energy management framework is then proposed to manage electricity consumption inside each residential energy eco-system. Objective of the dynamic energy management framework is to optimize the scheduling of all the controllable appliances and in-home charging of plug-in electric vehicles to minimize cost. Such an automated energy management framework is used to simulate residential demand response programs, and evaluate their impact on the electric power infrastructure. For instance, time-varying electricity pricing might lead to synchronization of the individual residential demands, creating pronounced rebound peaks in the aggregate demand that are higher and steeper than the original demand peaks that the time-varying electricity pricing structure intended to eliminate. The modeling tools developed in this study can serve as a virtual laboratory for investigating fundamental economic and policy-related questions regarding the interplay of individual consumers with energy use. The models developed allow for evaluating the impact of different energy policies, technology adoption, and electricity price structures on the total

  5. Export channel pricing management for integrated solutions

    OpenAIRE

    Roine, Henna; Sainio, Liisa-Maija; Saarenketo, Sami

    2012-01-01

    This article studies systems integrators' export channel pricing management for integrated solutions. We find support from our empirical case study for the notion that a systems integrator's export channel pricing strategy is multidimensional and dependent on international pricing environment and partner characteristics and that export partnerships have unique implications on a systems integrator's pricing process. The results show that giving up pricing control in export channel context may ...

  6. INTEGRATION CHALLENGES OF UNIVERSITY AND INFORMATION MANAGEMENT SYSTEM (UIMS TO MOODLE

    Directory of Open Access Journals (Sweden)

    Jyldyzbek J. Jakshylykov

    2016-06-01

    Full Text Available Introduction: in 2006 an International Ataturk Ala-Too University (IAAU began to adopt internationally recognised Bologna system, which was initiated by the Ministry of Science and Education of Kyrgyz Republic because of problems of managerial and educational problems at universities in Kyrgyzstan. Consequently, IAAU had to improve its information and grading system and created University Information and Manage¬ment System (UIMS, which was developed by the university professional team including the author. At the same time, the university began to apply a Moodle software, which delivers open source management system programs, in order to appropriately manage teaching proc esses and manage courses online. Materials and Methods: the methodological basis of the research are descriptive method, analysis, and comparison. Results: however, the IAAU faced some challenged issues in the application of the two innovation, which was the integration challenges of those Moodle and UIMS. Hence, the main purpose of this study is to demonstrate benefits of Moodle and UIMS linking challenges. at first, this paper informs Moodle functions, features, advantages and disadvantages in a shortly manner and UIMS management features and primary functions, which included six fundamentally crucial processes with some graphical representations. In addition, the analysis and methodologies of two systems through identifying advantages and disadvantages for the possible integ ration. Discussion and Conclusions: at the end, some challenged issues were identified from analysis results, also Moodle and UIMS benefits were demonstrated in the International Ataturk Ala-Too University.

  7. Integrated therapy safety management system

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-01-01

    Aims The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an ‘integrated therapy safety management’ is drafted. This concept could serve as a basis to improve resilience. Methods The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for ‘integrated therapy safety management’. The concept is applied by way of example for the ‘medication process’ to demonstrate its practical implementation. Results The ‘integrated therapy safety management’ is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of ‘bridge managers’. ‘Bridge managers’ anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the ‘bridge managers’ and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. Conclusions The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. PMID:24007448

  8. Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report

    International Nuclear Information System (INIS)

    PARSONS, J.E.

    1999-01-01

    The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; and protect human health and the environment

  9. Integrated management system for radioactive waste repositories (SGI3R)

    International Nuclear Information System (INIS)

    Silva, Fabio; Tello, Cledola Cassia Oliveira de

    2009-01-01

    The implantation of a repository for radioactive wastes is a multidisciplinary project that needs specialists of different areas of knowledge, interaction with public and private institutions, data and information related to radioactive wastes, geology, technology etc. All the activities must be in accordance with norms, requirements and procedures, including national and international legislation. The maintenance of the waste inventory records is an important regulatory requirement and must be available even after the closure of the repository. CDTN - Center of Nuclear Technology Development - is coordinating the Project for the construction of the national repository to dispose the low -and intermediate-level wastes. In order to consolidate all information that will come from this Project, it is being developed and implanted in CDTN a manager system of database, called Integrated Management System for Radioactive Waste Repositories (SGI3R), which will also manage all data from previous work carried out in Brazil and around the world about this subject. The proposal is to build a structure of modules, having as base eight modules: inventory, site selection, types of repository, technology, partners, legislation, communication and documents. The SGI3R running comprises the data processing (inclusion, update and exclusion), integration, standardization, and consistency among the processes. The SGI3R will give support to the stages of this Project, which will allow the preservation of all the available information, preventing duplication of efforts and additional costs, improving, in this way, the Project planning and execution. Additionally the SGI3R will make possible the information access to all stakeholders. (author)

  10. Control and management of distribution system with integrated DERs via IEC 61850 based communication

    Directory of Open Access Journals (Sweden)

    Ikbal Ali

    2017-06-01

    Full Text Available Distributed Energy Resources (DERs are being increasingly integrated in the distribution systems and resulting in complex power flow scenarios. In such cases, effective control, management and protection of distribution systems becomes highly challenging. Standardized and interoperable communication in distribution systems has the potential to deal with such challenges to achieve higher energy efficiency and reliability. Ed. 2 of IEC 61850 standards, for utility automation, standardizing the exchange of data among different substations, DERs, control centers, PMUs and PDCs. This paper demonstrates the modelling of information and services needed for control, management and protection of distribution systems with integrated DERs. This paper has used IP tunnels and/or mapping over IP layer for transferring IEC 61850 messages, such as sample values (SVs and GOOSE (Generic Object Oriented Substation Event, over distribution system Wide Area Network (WAN. Finally performance of the proposed communication configurations for different applications is analyzed by calculating End-to-End (ETE delay, throughput and jitter.

  11. Knowledge and information management for integrated water resource management

    Science.gov (United States)

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  12. Systems Modeling to Implement Integrated System Health Management Capability

    Science.gov (United States)

    Figueroa, Jorge F.; Walker, Mark; Morris, Jonathan; Smith, Harvey; Schmalzel, John

    2007-01-01

    ISHM capability includes: detection of anomalies, diagnosis of causes of anomalies, prediction of future anomalies, and user interfaces that enable integrated awareness (past, present, and future) by users. This is achieved by focused management of data, information and knowledge (DIaK) that will likely be distributed across networks. Management of DIaK implies storage, sharing (timely availability), maintaining, evolving, and processing. Processing of DIaK encapsulates strategies, methodologies, algorithms, etc. focused on achieving high ISHM Functional Capability Level (FCL). High FCL means a high degree of success in detecting anomalies, diagnosing causes, predicting future anomalies, and enabling health integrated awareness by the user. A model that enables ISHM capability, and hence, DIaK management, is denominated the ISHM Model of the System (IMS). We describe aspects of the IMS that focus on processing of DIaK. Strategies, methodologies, and algorithms require proper context. We describe an approach to define and use contexts, implementation in an object-oriented software environment (G2), and validation using actual test data from a methane thruster test program at NASA SSC. Context is linked to existence of relationships among elements of a system. For example, the context to use a strategy to detect leak is to identify closed subsystems (e.g. bounded by closed valves and by tanks) that include pressure sensors, and check if the pressure is changing. We call these subsystems Pressurizable Subsystems. If pressure changes are detected, then all members of the closed subsystem become suspect of leakage. In this case, the context is defined by identifying a subsystem that is suitable for applying a strategy. Contexts are defined in many ways. Often, a context is defined by relationships of function (e.g. liquid flow, maintaining pressure, etc.), form (e.g. part of the same component, connected to other components, etc.), or space (e.g. physically close

  13. Developing a New Integrated Model to improve the using of Classical Approach in Designing Management Information Systems

    OpenAIRE

    Mohammad M M Abu Omar; Khairul Anuar Abdullah

    2015-01-01

    Management information system (MIS) is used to solve management problems in the practical life, the designing and building of the management information systems is done by using one of the systems development methodologies. Classical approach is one of these methodologies which still suffer from some critical problems when it is used in designing and building the management information systems, it consumes more time and cost during its life cycle. This paper develops a new integrated model to...

  14. A Support Database System for Integrated System Health Management (ISHM)

    Science.gov (United States)

    Schmalzel, John; Figueroa, Jorge F.; Turowski, Mark; Morris, John

    2007-01-01

    The development, deployment, operation and maintenance of Integrated Systems Health Management (ISHM) applications require the storage and processing of tremendous amounts of low-level data. This data must be shared in a secure and cost-effective manner between developers, and processed within several heterogeneous architectures. Modern database technology allows this data to be organized efficiently, while ensuring the integrity and security of the data. The extensibility and interoperability of the current database technologies also allows for the creation of an associated support database system. A support database system provides additional capabilities by building applications on top of the database structure. These applications can then be used to support the various technologies in an ISHM architecture. This presentation and paper propose a detailed structure and application description for a support database system, called the Health Assessment Database System (HADS). The HADS provides a shared context for organizing and distributing data as well as a definition of the applications that provide the required data-driven support to ISHM. This approach provides another powerful tool for ISHM developers, while also enabling novel functionality. This functionality includes: automated firmware updating and deployment, algorithm development assistance and electronic datasheet generation. The architecture for the HADS has been developed as part of the ISHM toolset at Stennis Space Center for rocket engine testing. A detailed implementation has begun for the Methane Thruster Testbed Project (MTTP) in order to assist in developing health assessment and anomaly detection algorithms for ISHM. The structure of this implementation is shown in Figure 1. The database structure consists of three primary components: the system hierarchy model, the historical data archive and the firmware codebase. The system hierarchy model replicates the physical relationships between

  15. Integration of Health Systems Management Bachelors Program graduates into the Israeli healthcare market.

    Science.gov (United States)

    Schwartz-Ilan, Dana; Goldberg, Avishay; Pliskin, Joseph S; Peled, Ronit; Shvarts, Shifra

    2005-01-01

    Ben-Gurion University (BGU) in Beer-Sheva, opened a special program (B.A. degree) for training junior academic administrative personnel who can improve the quality of service in health care organizations through suitable and high-quality administration. The program the first of its kind in Israel, has been in operation since 1994, providing 50 candidates for administrative positions within the health system per year. The research goals of the project described in this paper were to examine integration of 224 graduates of the undergraduate program in Health Systems Management (HSM) within the private and public health system in Israel, including employment trends and evaluation of the program in retrospect. Questionnaires were sent to all graduates of the program. Participants were requested to answer questions regarding their present place of employment and their satisfaction with their academic degree. The findings showed that the graduates of the undergraduate program in HSM have integrated well into the health system, butnotas well as they could have. The graduates encountered difficulties in their absorption into management roles in the public health system and feel that the extent of their abilities has yet to be fully recognized and utilized by the system.

  16. Application of the Integrated Site and Environment Data Management System for LILW Disposal Site

    International Nuclear Information System (INIS)

    Lee, Ji Hoon; Lee, Eun Yong; Kim, Chang Lak

    2007-01-01

    During the last five years, Site Information and Total Environmental data management System(SITES) has been developed. SITES is an integrated program for overall data acquisition, environmental monitoring, and safety analysis. SITES is composed of three main modules, such as site database system (SECURE), safety assessment system (SAINT) and environmental monitoring system (SUDAL). In general, for the safe management of radioactive waste repository, the information of site environment should be collected and managed systematically from the initial site survey. For this, SECURE module manages its data for the site characterization, environmental information, and radioactive environmental information etc. The purpose of SAINT module is to apply and analyze the data from SECURE. SUDAL is developed for environmental monitoring of the radioactive waste repository. Separately, it is ready to open to the public for offering partial information

  17. An integrated chronic disease management model: a diagonal approach to health system strengthening in South Africa.

    Science.gov (United States)

    Mahomed, Ozayr Haroon; Asmall, Shaidah; Freeman, Melvyn

    2014-11-01

    The integrated chronic disease management model provides a systematic framework for creating a fundamental change in the orientation of the health system. This model adopts a diagonal approach to health system strengthening by establishing a service-linked base to training, supervision, and the opportunity to try out, assess, and implement integrated interventions.

  18. Air Traffic Management and Space Transportation - System Wide Information Management and the Integration in European Airspace

    OpenAIRE

    Kaltenhäuser, Sven; Morlang, Frank; Hampe, Jens; Jakobi, Jörn; Schmitt, Dirk-Roger

    2015-01-01

    Space Travel becomes an international business and requires landing opportunities all over the world. The integration of space vehicles in airspace therefore is an increasingly important topic to be considered on an international scale. With the Single European Sky ATM Research Programme (SESAR) preparing the implementation of a new ATM system in Europe, requirements have been defined for Shared and Reference Business Trajectories as well as System Wide Information Management (SWIM). The s...

  19. Assessment and management of ecological integrity: Chapter 12

    Science.gov (United States)

    Kwak, Thomas J.; Freeman, Mary C.

    2010-01-01

    Assessing and understanding the impacts of human activities on aquatic ecosystems has long been a focus of ecologists, water resources managers, and fisheries scientists. While traditional fisheries management focused on single-species approaches to enhance fish stocks, there is a growing emphasis on management approaches at community and ecosystem levels. Of course, as fisheries managers shift their attention from narrow (e.g., populations) to broad organizational scales (e.g., communities or ecosystems), ecological processes and management objectives become more complex. At the community level, fisheries managers may strive for a fish assemblage that is complex, persistent, and resilient to disturbance. Aquatic ecosystem level objectives may focus on management for habitat quality and ecological processes, such as nutrient dynamics, productivity, or trophic interactions, but a long-term goal of ecosystem management may be to maintain ecological integrity. However, human users and social, economic, and political demands of fisheries management often result in a reduction of ecological integrity in managed systems, and this conflict presents a principal challenge for the modern fisheries manager. The concepts of biotic integrity and ecological integrity are being applied in fisheries science, natural resource management, and environmental legislation, but explicit definitions of these terms are elusive. Biotic integrity of an ecosystem may be defined as the capability of supporting and maintaining an integrated, adaptive community of organisms having a species composition, diversity, and functional organization comparable to that of a natural habitat of the region (Karr and Dudley 1981). Following that, ecological integrity is the summation of chemical, physical, and biological integrity. Thus, the concept of ecological integrity extends beyond fish and represents a holistic approach for ecosystem management that is especially applicable to aquatic systems. The

  20. Integrated management of water resources in urban water system: Water Sensitive Urban Development as a strategic approach

    Directory of Open Access Journals (Sweden)

    Juan Joaquín Suárez López

    2014-08-01

    Full Text Available The urban environment has to be concerned with the integrated water resources management, which necessarily includes the concept of basin unity and governance.  The traditional urban water cycle framework, which includes water supply, sewerage and wastewater treatment services, is being replaced by a holistic and systemic concept, where water is associated with urbanism and sustainability policies. This global point of view cannot be ignored as new regulations demand systemic and environmental approaches to the administrations, for instance, in the management of urban drainage and sewerage systems. The practical expression of this whole cluster interactions is beginning to take shape in several countries, with the definition of Low Impact Development and Water Sensitivity Urban Design concepts. Intends to integrate this new strategic approach under the name: “Water Sensitive Urban Development” (WSUD. With WSUD approach, the current urban water systems (originally conceived under the traditional concept of urban water cycle can be transformed, conceptual and physically, for an integrated management of the urban water system in new models of sustainable urban development. A WSUD implementing new approach to the management of pollution associated with stormwater in the urban water system is also presented, including advances in environmental regulations and incorporation of several techniques in Spain.

  1. Integrated weed management systems with herbicide-tolerant crops in the European Union: lessons learnt from home and abroad.

    Science.gov (United States)

    Lamichhane, Jay Ram; Devos, Yann; Beckie, Hugh J; Owen, Micheal D K; Tillie, Pascal; Messéan, Antoine; Kudsk, Per

    2017-06-01

    Conventionally bred (CHT) and genetically modified herbicide-tolerant (GMHT) crops have changed weed management practices and made an important contribution to the global production of some commodity crops. However, a concern is that farm management practices associated with the cultivation of herbicide-tolerant (HT) crops further deplete farmland biodiversity and accelerate the evolution of herbicide-resistant (HR) weeds. Diversification in crop systems and weed management practices can enhance farmland biodiversity, and reduce the risk of weeds evolving herbicide resistance. Therefore, HT crops are most effective and sustainable as a component of an integrated weed management (IWM) system. IWM advocates the use of multiple effective strategies or tactics to manage weed populations in a manner that is economically and environmentally sound. In practice, however, the potential benefits of IWM with HT crops are seldom realized because a wide range of technical and socio-economic factors hamper the transition to IWM. Here, we discuss the major factors that limit the integration of HT crops and their associated farm management practices in IWM systems. Based on the experience gained in countries where CHT or GMHT crops are widely grown and the increased familiarity with their management, we propose five actions to facilitate the integration of HT crops in IWM systems within the European Union.

  2. Integrated energy and emission management for heavy-duty diesel engines with waste heat recovery system

    NARCIS (Netherlands)

    Willems, F.P.T.; Kupper, F.; Cloudt, R.P.M.

    2012-01-01

    This study presents an integrated energy and emission management strategy for an Euro-VI diesel engine with Waste Heat Recovery (WHR) system. This Integrated Powertrain Control (IPC) strategy optimizes the CO2-NOx trade-off by minimizing the operational costs associated with fuel and AdBlue

  3. Evaluating Information System Integration approaches for fixed asset management framework in Tanzania

    Directory of Open Access Journals (Sweden)

    Theophil Assey

    2017-10-01

    Full Text Available Information systems are developed based on different requirements and different technologies. Integration of these systems is of vital importance as they cannot work in isolation, they need to share and exchange data with other information systems. The Information Systems handle data of different types and formats’, finding a way to make them communicate is important as they need to exchange data during transactions, communication and different aspects which may require their interactions. In Tanzanian Local Government Authorities (LGAs, fixed asset data are not centralized, individual Local Government Authority stores their own data in isolation yet accountability is required through the provision of centralized storage for easy data access and easier data integration with other Information Systems in order to enhance fixed asset accountability. The study was carried out through reviewing of literature on the existing Information System integration approaches in order to identify and propose the best approach to be used in fixed asset management systems in LGA’s in Tanzania. The different approaches which are used for systems integration such as Service Oriented Architecture (SOA, Common Object Request Broker (CORBA, Common Object Model (COM and eXtensible Markup Language (XML were evaluated under the factors considered at the LGA. The XML was preferred over SOA, CORBA and COM because of some challenges in governance, data security, availability of expertise for support, maintenance, implementation cost, performance, compliance with government changing policies and service reliability. The proposed approach integrates data for all the Local Government Authorities at a centralized location and middleware transforms the centralized data into XML so it can easily be used by other Information Systems.

  4. Intelligent control and maintenance of management integrated system based on multi-agents for coal preparation plant

    Energy Technology Data Exchange (ETDEWEB)

    Meng, F.; Wang, Y. [China University of Mining and technology, Xuzhou (China). School of Information and Electrical Engineering

    2006-06-15

    This paper discusses the progress of computer integrated processing (CIPS) of coal preparation and then presents an intelligence controlled production process, device-maintenance and production-management system of coal preparation based on multi-agents (IICMMS-CP). The construction of the IICMMS-CP, the distributed network control system based on live intelligence control stations and the strategy of implementing a distributed intelligence control system are studied in order to overcome the disadvantages brought about by the wide use of the PLC system by coal preparation plants. The software frame, based on a Multi-Agent Intelligence Control and Maintenance Management integrated system, is studied and the implementation methods of IICMMS-CP are discussed. The characteristics of distributed architecture, cooperation and parallel computing meet the needs of integrated control of coal preparation plants with large-scale spatial production distribution, densely-related processes and complex systems. Its application further improves the reliability and precision of process control, accuracy of fault identification and intelligence of production adjustment, establishes a technical basis for system integration and flexible production. The main function of the system has been tested in a coal preparation plant to good effect in stabilizing product quality, improving efficiency and reducing consumption. 17 refs., 4 figs.

  5. Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report

    Energy Technology Data Exchange (ETDEWEB)

    PARSONS, J.E.

    1999-10-28

    The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; and protect human health and the environment.

  6. Systems Engineering and Integration for Advanced Life Support System and HST

    Science.gov (United States)

    Kamarani, Ali K.

    2005-01-01

    Systems engineering (SE) discipline has revolutionized the way engineers and managers think about solving issues related to design of complex systems: With continued development of state-of-the-art technologies, systems are becoming more complex and therefore, a systematic approach is essential to control and manage their integrated design and development. This complexity is driven from integration issues. In this case, subsystems must interact with one another in order to achieve integration objectives, and also achieve the overall system's required performance. Systems engineering process addresses these issues at multiple levels. It is a technology and management process dedicated to controlling all aspects of system life cycle to assure integration at all levels. The Advanced Integration Matrix (AIM) project serves as the systems engineering and integration function for the Human Support Technology (HST) program. AIM provides means for integrated test facilities and personnel for performance trade studies, analyses, integrated models, test results, and validated requirements of the integration of HST. The goal of AIM is to address systems-level integration issues for exploration missions. It will use an incremental systems integration approach to yield technologies, baselines for further development, and possible breakthrough concepts in the areas of technological and organizational interfaces, total information flow, system wide controls, technical synergism, mission operations protocols and procedures, and human-machine interfaces.

  7. Preventing Distribution Grid Congestion by Integrating Indirect Control in a Hierarchical Electric Vehicles Management System

    DEFF Research Database (Denmark)

    Hu, Junjie; Si, Chengyong; Lind, Morten

    2016-01-01

    In this paper, a hierarchical management system is proposed to integrate electric vehicles (EVs) into a distribution grid. Three types of actors are included in the system: Distribution system operators (DSOs), Fleet operators (FOs) and EV owners. In contrast to a typical hierarchical control sys...

  8. Experimental investigation on an integrated thermal management system with heat pipe heat exchanger for electric vehicle

    OpenAIRE

    Zou, Huiming; Wang, Wei; Zhang, Guiying; Qin, Fei; Tian, Changqing; Yan, Yuying

    2016-01-01

    An integrated thermal management system combining a heat pipe battery cooling/preheating system with the heat pump air conditioning system is presented to fulfill the comprehensive energy utilization for electric vehicles. A test bench with battery heat pipe heat exchanger and heat pump air conditioning for a regular five-chair electric car is set up to research the performance of this integrated system under different working conditions. The investigation results show that as the system is d...

  9. End-user satisfaction analysis on library management system unnes using technology acceptance model towards national standard of integrated library

    Science.gov (United States)

    Hardyanto, W.; Purwinarko, A.; Adhi, M. A.

    2018-03-01

    The library which is the gate of the University should be supported by the existence of an adequate information system, to provide excellent service and optimal to every user. Library management system that has been in existence since 2009 needs to be re-evaluated so that the system can meet the needs of both operator and Unnes user in particular, and users from outside Unnes in general. This study aims to evaluate and improve the existing library management system to produce a system that is accountable and able to meet the needs of end users, as well as produce a library management system that is integrated Unnes. Research is directed to produce evaluation report with Technology Acceptance Model (TAM) approach and library management system integrated with the national standard.

  10. Ways to integrate document management systems with industrial plant configuration management systems

    International Nuclear Information System (INIS)

    Munoz, M.

    1995-01-01

    Based on experience gained from tasks carried out for Almaraz Nuclear Power Plant, this paper describes computer platforms used both at the power plant and in the main offices of the engineering company. Subsequently, a description is given of the procedure followed for the continuous up-dating of plant documentation, in order to maintain consistency with other information stored in data bases in the Operation Management System, Maintenance System, Modification Management System, etc. The work method used for the unitary updating of all information (document images and attributes corresponding to the different data bases), following refuelling procedures is also described. Lastly, the paper describes the functions and the user interface of the system used in the power plant for document management. (Author)

  11. Regulatory body contribution to the development of an integrated radioactive waste management system in the Slovak Republic

    International Nuclear Information System (INIS)

    Konecny, L.; Burclova, J.

    2002-01-01

    The nuclear energy is a very important part of electricity production in the Slovak Republic. Slovakia currently operates 6 nuclear units in two sites and their share on total power production is about 55%. Original soviet design of NPPs operated in Slovakia was based on storage strategy of non-treated solid waste and evaporated liquid waste until decommissioning of the plant. A new approach to the waste management at the end of the 1980s resulted in a strategy to install technologies able to transform in principle all radioactive waste into a form suitable for disposal. The technological part of radioactive waste management was supported in the late 1990s by respective legislation namely by a new act on peaceful use of nuclear energy and by regulation on radioactive waste and spent fuel management. Thus the basis for an integrated radioactive waste management system was created and technical short and long term solutions for the management of all kinds of radioactive waste were prepared. A comprehensive combination of individual components such as legal framework, regulation, overall organization, technology etc. in a single functional system is required for an effective and safe waste management system. Although the waste management system in the Slovak Republic is influenced by historical, socio-political, economic and other factors, a strong regulatory body is one of the key elements of an integrated approach to a generic national system for management of all types of wastes. UJD SR which was appointed as the central state authority for nuclear safety supervision took great effort in its legislative, licensing, assessment and inspection activities with the aim to support this integrated approach. (author)

  12. Technical note: Efficient online source identification algorithm for integration within a contamination event management system

    Science.gov (United States)

    Deuerlein, Jochen; Meyer-Harries, Lea; Guth, Nicolai

    2017-07-01

    Drinking water distribution networks are part of critical infrastructures and are exposed to a number of different risks. One of them is the risk of unintended or deliberate contamination of the drinking water within the pipe network. Over the past decade research has focused on the development of new sensors that are able to detect malicious substances in the network and early warning systems for contamination. In addition to the optimal placement of sensors, the automatic identification of the source of a contamination is an important component of an early warning and event management system for security enhancement of water supply networks. Many publications deal with the algorithmic development; however, only little information exists about the integration within a comprehensive real-time event detection and management system. In the following the analytical solution and the software implementation of a real-time source identification module and its integration within a web-based event management system are described. The development was part of the SAFEWATER project, which was funded under FP 7 of the European Commission.

  13. Idaho National Laboratory Integrated Safety Management System FY 2016 Effectiveness Review and Declaration Report

    International Nuclear Information System (INIS)

    Hunt, Farren J.

    2016-01-01

    Idaho National Laboratory's (INL's) Integrated Safety Management System (ISMS) effectiveness review of fiscal year (FY) 2016 shows that INL has integrated management programs and safety elements throughout the oversight and operational activities performed at INL. The significant maturity of Contractor Assurance System (CAS) processes, as demonstrated across INL's management systems and periodic reporting through the Management Review Meeting process, over the past two years has provided INL with current real-time understanding and knowledge pertaining to the health of the institution. INL's sustained excellence of the Integrated Safety and effective implementation of the Worker Safety and Health Program is also evidenced by other external validations and key indicators. In particular, external validations include VPP, ISO 14001, DOELAP accreditation, and key Laboratory level indicators such as ORPS (number, event frequency and severity); injury/illness indicators such as Days Away, Restricted and Transfer (DART) case rate, back & shoulder metric and open reporting indicators, demonstrate a continuous positive trend and therefore improved operational performance over the last few years. These indicators are also reflective of the Laboratory's overall organizational and safety culture improvement. Notably, there has also been a step change in ESH&Q Leadership actions that have been recognized both locally and complex-wide. Notwithstanding, Laboratory management continues to monitor and take action on lower level negative trends in numerous areas including: Conduct of Operations, Work Control, Work Site Analysis, Risk Assessment, LO/TO, Fire Protection, and Life Safety Systems, to mention a few. While the number of severe injury cases has decreased, as evidenced by the reduction in the DART case rate, the two hand injuries and the fire truck/ambulance accident were of particular concern. Aggressive actions continue in order to understand the causes and define actions

  14. Idaho National Laboratory Integrated Safety Management System FY 2016 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Farren J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-12-01

    Idaho National Laboratory’s (INL’s) Integrated Safety Management System (ISMS) effectiveness review of fiscal year (FY) 2016 shows that INL has integrated management programs and safety elements throughout the oversight and operational activities performed at INL. The significant maturity of Contractor Assurance System (CAS) processes, as demonstrated across INL’s management systems and periodic reporting through the Management Review Meeting process, over the past two years has provided INL with current real-time understanding and knowledge pertaining to the health of the institution. INL’s sustained excellence of the Integrated Safety and effective implementation of the Worker Safety and Health Program is also evidenced by other external validations and key indicators. In particular, external validations include VPP, ISO 14001, DOELAP accreditation, and key Laboratory level indicators such as ORPS (number, event frequency and severity); injury/illness indicators such as Days Away, Restricted and Transfer (DART) case rate, back & shoulder metric and open reporting indicators, demonstrate a continuous positive trend and therefore improved operational performance over the last few years. These indicators are also reflective of the Laboratory’s overall organizational and safety culture improvement. Notably, there has also been a step change in ESH&Q Leadership actions that have been recognized both locally and complex-wide. Notwithstanding, Laboratory management continues to monitor and take action on lower level negative trends in numerous areas including: Conduct of Operations, Work Control, Work Site Analysis, Risk Assessment, LO/TO, Fire Protection, and Life Safety Systems, to mention a few. While the number of severe injury cases has decreased, as evidenced by the reduction in the DART case rate, the two hand injuries and the fire truck/ambulance accident were of particular concern. Aggressive actions continue in order to understand the causes and

  15. Monitoring System for Storm Readiness and Recovery of Test Facilities: Integrated System Health Management (ISHM) Approach

    Science.gov (United States)

    Figueroa, Fernando; Morris, Jon; Turowski, Mark; Franzl, Richard; Walker, Mark; Kapadia, Ravi; Venkatesh, Meera; Schmalzel, John

    2010-01-01

    Severe weather events are likely occurrences on the Mississippi Gulf Coast. It is important to rapidly diagnose and mitigate the effects of storms on Stennis Space Center's rocket engine test complex to avoid delays to critical test article programs, reduce costs, and maintain safety. An Integrated Systems Health Management (ISHM) approach and technologies are employed to integrate environmental (weather) monitoring, structural modeling, and the suite of available facility instrumentation to provide information for readiness before storms, rapid initial damage assessment to guide mitigation planning, and then support on-going assurance as repairs are effected and finally support recertification. The system is denominated Katrina Storm Monitoring System (KStorMS). Integrated Systems Health Management (ISHM) describes a comprehensive set of capabilities that provide insight into the behavior the health of a system. Knowing the status of a system allows decision makers to effectively plan and execute their mission. For example, early insight into component degradation and impending failures provides more time to develop work around strategies and more effectively plan for maintenance. Failures of system elements generally occur over time. Information extracted from sensor data, combined with system-wide knowledge bases and methods for information extraction and fusion, inference, and decision making, can be used to detect incipient failures. If failures do occur, it is critical to detect and isolate them, and suggest an appropriate course of action. ISHM enables determining the condition (health) of every element in a complex system-of-systems or SoS (detect anomalies, diagnose causes, predict future anomalies), and provide data, information, and knowledge (DIaK) to control systems for safe and effective operation. ISHM capability is achieved by using a wide range of technologies that enable anomaly detection, diagnostics, prognostics, and advise for control: (1

  16. Opportunities for Launch Site Integrated System Health Engineering and Management

    Science.gov (United States)

    Waterman, Robert D.; Langwost, Patricia E.; Waterman, Susan J.

    2005-01-01

    The launch site processing flow involves operations such as functional verification, preflight servicing and launch. These operations often include hazards that must be controlled to protect human life and critical space hardware assets. Existing command and control capabilities are limited to simple limit checking durig automated monitoring. Contingency actions are highly dependent on human recognition, decision making, and execution. Many opportunities for Integrated System Health Engineering and Management (ISHEM) exist throughout the processing flow. This paper will present the current human-centered approach to health management as performed today for the shuttle and space station programs. In addition, it will address some of the more critical ISHEM needs, and provide recommendations for future implementation of ISHEM at the launch site.

  17. Integrated energy and emission management for heavy-duty diesel engines with waste heat recovery system

    NARCIS (Netherlands)

    Willems, F.P.T.; Kupper, F.; Rascanu, G.; Feru, E.

    2015-01-01

    Rankine-cycleWasteHeatRecovery (WHR)systems are promising solutions to reduce fuel consumption for trucks. Due to coupling between engine andWHR system, control of these complex systems is challenging. This study presents an integrated energy and emission management strategy for an Euro-VI Diesel

  18. The Integration of Pedagogical Aspects in Environmental Management Systems in Selected South African Primary Schools

    Science.gov (United States)

    Kanyimba, Alex; Richter, Barry; Raath, Schalk

    2015-01-01

    Environmental management systems implemented in schools are regarded by many as a mechanism for the integration of environmental matters in all the operational functions of the school. The links, however, between environmental management and curriculum practice have not been adequately addressed in the literature. This article reports on the…

  19. Research on monitoring and management information integration technique in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Yu Ren; Mao Wei

    2013-01-01

    The integration of the waste treatment process and the device status monitoring information and management information is a key problem required to be solved in the information integration of the waste treatment and management. The main content of the monitoring and management information integration is discussed in the paper. The data exchange techniques, which are based on the OPC, FTP and data push technology, are applied to the different monitoring system respectively, according to their development platform, to realize the integration of the waste treatment process and device status monitoring information and management information in a waste treatment center. (authors)

  20. Integrated system of structural health monitoring and intelligent management for a cable-stayed bridge.

    Science.gov (United States)

    Chen, Bin; Wang, Xu; Sun, Dezhang; Xie, Xu

    2014-01-01

    It is essential to construct structural health monitoring systems for large important bridges. Zhijiang Bridge is a cable-stayed bridge that was built recently over the Hangzhou Qiantang River (the largest river in Zhejiang Province). The length of Zhijiang Bridge is 478 m, which comprises an arched twin-tower space and a twin-cable plane structure. As an example, the present study describes the integrated system of structural health monitoring and intelligent management for Zhijiang Bridge, which comprises an information acquisition system, data management system, evaluation and decision-making system, and application service system. The monitoring components include the working environment of the bridge and various factors that affect bridge safety, such as the stress and strain of the main bridge structure, vibration, cable force, temperature, and wind speed. In addition, the integrated system includes a forecasting and decision-making module for real-time online evaluation, which provides warnings and makes decisions based on the monitoring information. From this, the monitoring information, evaluation results, maintenance decisions, and warning information can be input simultaneously into the bridge monitoring center and traffic emergency center to share the monitoring data, thereby facilitating evaluations and decision making using the system.

  1. INTEGRATION LEVEL OF FINANCIAL AND MANAGEMENT ACCOUNTING SYSTEMS WITH THE ACCOUNTING CONVERGENCE PROCESS AND THE EFFECTIVENESS OF CONTROLLERSHIP

    Directory of Open Access Journals (Sweden)

    Andréia Carpes Dani

    2014-09-01

    Full Text Available This study aims to verify the integration level between the financial and management accounting systems as a result of the convergence process with the international accounting standards and of the effectiveness of controllership in Brazilian companies. A descriptive research was undertaken, based on the application of the questionnaire by Angelkort and Weißenberger (2011 to the 500 Best and Biggest of Revista Exame, issue 2011, using a sample of 32 companies that answered the research. The correlations between the integration level of the financial and management accounting systems and the variables “consistency of financial language”, “quality of services provided” and “degree of influence in decision making”, during the convergence period with the international accounting standards, were positive and moderate. It was also observed that the period before the accounting convergence (2004 till 2007 showed a better integration level of the financial and management accounting systems than the accounting convergence period (2008 till 2011. In conclusion, the accounting convergence process increased the integration level of the financial and management accounting systems in the investigated companies, as well as the effectiveness of controllership, particularly in the consistency of the financial language, in the quality of the services provided and in the influence of the controllers’ services on these companies’ decisions.

  2. Integrated system for management and control of energetical distribution; Sistema integrado de gestion y control de la red de distribucion

    Energy Technology Data Exchange (ETDEWEB)

    Hidalgo Vega, V.; Flores Canales, J.M.; Moreno Morales, J. [Sainco (Spain)

    1995-08-01

    This article presents the integrated system of management and control in the distribution network. This system permits to improve the energetical demand management. The automatized system has 4 functions. (1) Telecontrol of the network; (2) Management of the energy supplies; (3) Energetic control and user management; (4) Big corporative systems.

  3. Integral Management of Irrigation Water in Intensive Horticultural Systems of Almería

    Directory of Open Access Journals (Sweden)

    Pedro Garcia-Caparros

    2017-12-01

    Full Text Available The development of intensive horticulture in Almería, with a huge increase in greenhouse surface area, is related to three essential factors: climatic characteristics, groundwater use and mulching sandy soil. The purpose of the present paper is to draw a picture of the integral management of water irrigation in the intensive horticultural systems in the region, by identifying the most significant water resource contributions and alternative water resources. Results indicate that the use of groundwater for the irrigation of horticultural crops in the greenhouses presents a high degree of overexploitation of the aquifers, but due to the continuous search for alternative water resources, such as desalinated and reclaimed water, as well as in-depth knowledge of the integral management of water irrigation through automated fertigation and localized irrigation systems, the current status of the water resources could be sustainable. Moreover, being conscious of the pollution generated by agricultural leachates, the horticultural system of Almería is implementing complementary sustainable systems such as recirculation, cascade cropping systems and phytodepuration for the reuse of the leachate. Considering all these factors, it can be concluded that the intensive horticultural system is on the right path towards respecting the environment and being sustainable in terms of water use.

  4. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  5. The need for integrated off-shore, real-time information and management systems

    Energy Technology Data Exchange (ETDEWEB)

    Morley, L W

    1981-07-01

    Integrated planning, in which data from ships, aircraft, data buoys, and shore or satellite-borne radar are used for ocean surveillance is urged. The Atlantic coast of Canada is used as an example of the inefficiency of current management methods. Traffic control, search and rescue missions, pollution control, weather forecasting, and fisheries management are directed by separate government agencies, each with its own information system. A coordinated approach would reduce waste and allow full advantage to be taken of technological developments, e.g., satellites, unknown when the agencies were created.

  6. Soil physico-hydrical properties resulting from the management in Integrated Production Systems

    Directory of Open Access Journals (Sweden)

    André Carlos Auler

    Full Text Available Anthropic action, such as the soil use and management systems, promote changes in the soil structure. These changes might hamper the development of plants in soil management practices that involve its mobilization, and the negative effects might be increased due to intensive use. The aim of this study was to evaluate the physico-hydrical properties of a Haplohumox in integrated production systems under different soil managements. The soil superficial (0.0-0.10 m and sub-superficial (0.10-0.20 m layers were evaluated in the different systems: conventional tillage (CT, minimum tillage (MT, no-tillage (NT and chiseled no-tillage (CNT, taking into consideration the annual ryegrass cropped for different uses [cover crop (C, grazing (G and silage (S] during the winter. Soil bulk density (Db, total porosity (TP, macro (Ma and microporosity (Mi, water retention curves (SWRC and water retention due to pore size (r were determined. The annual ryegrass used as C produced lower Db and Mi and higher TP and Ma in CT, MT and CNT systems. No difference was verified between G and S in any of the management systems or soil layers. The superficial layer SWRC presented similar behavior regarding CT, MT and CNT. Under NT, C resulted in higher water retention. However, G and S provided higher water retention due to the pore size in this system.

  7. Integrating Systems Health Management with Adaptive Controls for a Utility-Scale Wind Turbine

    Science.gov (United States)

    Frost, Susan A.; Goebel, Kai; Trinh, Khanh V.; Balas, Mark J.; Frost, Alan M.

    2011-01-01

    Increasing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. Systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage. Advanced adaptive controls can provide the mechanism to enable optimized operations that also provide the enabling technology for Systems Health Management goals. The work reported herein explores the integration of condition monitoring of wind turbine blades with contingency management and adaptive controls. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

  8. Management analysis for special competitions based on ISO 9001:2008 Quality management systems, ISO 1400:2004 Environmental management systems and OHSAS 18001:2007 Occupational health and safety management systems

    OpenAIRE

    Alcalá Ortiz, Gabriela José

    2015-01-01

    ABSTRACT: This paper aims to analyze the managing condition of the participating projects in the competition Solar Decathlon Europe 2014, depart from that, a suitable integrated management system is proposed. The analysis was accomplished due to the design and application of a questionnaire based in ISO standards, concerning quality, environmental and health and safety management. The results showed the weakness regarding management system, this means the lack of integrated policy, inte...

  9. The Integrated Waste Tracking Systems (IWTS) - A Comprehensive Waste Management Tool

    International Nuclear Information System (INIS)

    Robert S. Anderson

    2005-01-01

    The US Department of Energy (DOE) Idaho National Laboratory (INL) site located near Idaho Falls, ID USA, has developed a comprehensive waste management and tracking tool that integrates multiple operational activities with characterization data from waste declaration through final waste disposition. The Integrated Waste Tracking System (IWTS) provides information necessary to help facility personnel properly manage their waste and demonstrate a wide range of legal and regulatory compliance. As a client?server database system, the IWTS is a proven tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of flexibility. This paper describes some of the history involved with the development and current use of IWTS as a comprehensive waste management tool as well as a discussion of IWTS deployments performed by the INL for outside clients. Waste management spans a wide range of activities including: work group interactions, regulatory compliance management, reporting, procedure management, and similar activities. The IWTS documents these activities and performs tasks in a computer-automated environment. Waste characterization data, container characterization data, shipments, waste processing, disposals, reporting, and limit compliance checks are just a few of the items that IWTS documents and performs to help waste management personnel perform their jobs. Throughout most hazardous and radioactive waste generating, storage and disposal sites, waste management is performed by many different groups of people in many facilities. Several organizations administer their areas of waste management using their own procedures and documentation independent of other organizations. Files are kept, some of which are treated as quality records, others not as stringent. Quality records maintain a history of: changes performed after approval, the reason for the change(s), and a record of whom and when

  10. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Farren [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  11. Systems approaches to integrated solid waste management in developing countries

    International Nuclear Information System (INIS)

    Marshall, Rachael E.; Farahbakhsh, Khosrow

    2013-01-01

    Highlights: ► Five drivers led developed countries to current solid waste management paradigm. ► Many unique factors challenge developing country solid waste management. ► Limited transferability of developed country approaches to developing countries. ► High uncertainties and decision stakes call for post-normal approaches. ► Systems thinking needed for multi-scale, self-organizing eco-social waste systems. - Abstract: Solid waste management (SWM) has become an issue of increasing global concern as urban populations continue to rise and consumption patterns change. The health and environmental implications associated with SWM are mounting in urgency, particularly in the context of developing countries. While systems analyses largely targeting well-defined, engineered systems have been used to help SWM agencies in industrialized countries since the 1960s, collection and removal dominate the SWM sector in developing countries. This review contrasts the history and current paradigms of SWM practices and policies in industrialized countries with the current challenges and complexities faced in developing country SWM. In industrialized countries, public health, environment, resource scarcity, climate change, and public awareness and participation have acted as SWM drivers towards the current paradigm of integrated SWM. However, urbanization, inequality, and economic growth; cultural and socio-economic aspects; policy, governance, and institutional issues; and international influences have complicated SWM in developing countries. This has limited the applicability of approaches that were successful along the SWM development trajectories of industrialized countries. This review demonstrates the importance of founding new SWM approaches for developing country contexts in post-normal science and complex, adaptive systems thinking

  12. Systems approaches to integrated solid waste management in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, Rachael E., E-mail: rmarsh01@uoguelph.ca [School of Engineering, University of Guelph, Albert A. Thornbrough Building, Guelph, ON, Canada N1G 2W1 (Canada); Farahbakhsh, Khosrow, E-mail: khosrowf@uoguelph.ca [School of Engineering, University of Guelph, Albert A. Thornbrough Building, Guelph, ON, Canada N1G 2W1 (Canada)

    2013-04-15

    Highlights: ► Five drivers led developed countries to current solid waste management paradigm. ► Many unique factors challenge developing country solid waste management. ► Limited transferability of developed country approaches to developing countries. ► High uncertainties and decision stakes call for post-normal approaches. ► Systems thinking needed for multi-scale, self-organizing eco-social waste systems. - Abstract: Solid waste management (SWM) has become an issue of increasing global concern as urban populations continue to rise and consumption patterns change. The health and environmental implications associated with SWM are mounting in urgency, particularly in the context of developing countries. While systems analyses largely targeting well-defined, engineered systems have been used to help SWM agencies in industrialized countries since the 1960s, collection and removal dominate the SWM sector in developing countries. This review contrasts the history and current paradigms of SWM practices and policies in industrialized countries with the current challenges and complexities faced in developing country SWM. In industrialized countries, public health, environment, resource scarcity, climate change, and public awareness and participation have acted as SWM drivers towards the current paradigm of integrated SWM. However, urbanization, inequality, and economic growth; cultural and socio-economic aspects; policy, governance, and institutional issues; and international influences have complicated SWM in developing countries. This has limited the applicability of approaches that were successful along the SWM development trajectories of industrialized countries. This review demonstrates the importance of founding new SWM approaches for developing country contexts in post-normal science and complex, adaptive systems thinking.

  13. Transition from quality assurance to an integrated management system for nuclear organizations

    International Nuclear Information System (INIS)

    Dua, Shami

    2008-01-01

    The integrated performance- based approach to management systems is a business imperative for the nuclear industry to maintain and enhance its share in the energy sector. The compliance approach has served the industry well to protect its employed, neighbourhood and public at large. It is well recognized that industry has to build on this experience and move to the next level. The model described in this paper provides a fairly flexible approach to move towards a more integrated performance based approach to achieve both the compliance and business related goals and objectives. Compliance with quality and safety requirements must remain a key focus for the industry. The model presented provides a practical approach to develop the business and compliance processes and documentation that can be integrated at the job and project execution levels. The product and business performance objectives will be embedded into the system documentation and implementation at all levels by the responsible line units. The model can be easily adapted to meet the requirements of applicable codes and standards and lends itself to obtain ISO and other system and product based certifications. The approach is consistent with the new IAEA direction on the management system requirements as covered in its new series of standards under GS-R-3. As IAEA is planning a number of regional workshops, nuclear organizations planning to transition to the IMS approach should participate and benefit from these workshops. This will further enhance their understanding and application of the IMS concepts and methodologies. IAEA conducted a joint workshop with FORATOM in Vienna, Austria in November 2007 and another is planned in October 2008 jointly with KHNP and PNC in Busan, S.Korea. (author)

  14. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  15. Effective integration of environmental leadership and environmental management systems within Cameco's Mining Division

    International Nuclear Information System (INIS)

    Nagy, K.; Borchardt, S.

    2010-01-01

    To support the implementation of its integrated Safety, Health, Environment & Quality (SHEQ) Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducing environmental impacts in five key areas: air emissions, treated water quality and quantity, energy use and greenhouse gas emissions, and waste generation. To ensure environmental leadership becomes routine business practice, it was necessary to integrate the initiative into Cameco's programs and management systems at the corporate and operational levels. Operations-based environmental leadership strategies and action plans have since been developed, as well as a corporate reporting system to monitor Cameco's environmental performance. (author)

  16. Toward an Evolutive and Tightly Integrated Information System for Nuclear Materials Management

    Energy Technology Data Exchange (ETDEWEB)

    Dessoude, O. [Euriware (Areva Group), 25 avenue de Tourville, Equeurdreville, 50100 (France)

    2009-06-15

    From a nuclear materials management standpoint, spent-fuel recycling is considered a very challenging activity. This challenge has its positive counterpart as a lot has been learned from confronting a large variety of nuclear materials, complex material transfers and transformations. Since the inception of its computerized nuclear materials management system, AREVA NC La Hague has relied upon its IT subsidiary EURIWARE for software design and development. In 2003, the founding milestone was the implementation of the new GMP software package (Gestion des Matieres et des Produits - Materials and Products Management). GMP was underpinned by the following principles: reliability, transparency and close integration with the process control layer, so as to mitigate human errors and keep the management process smooth and efficient. In 2005, another major milestone was reached with CMNR (Comptabilite des Matieres Nucleaires Reglementaire - Regulatory Nuclear Materials Accountancy), a system in charge of local accounting and multi-site consolidation at corporate level. In spite of an auspicious start, GMP came up against the same stumbling block as many information systems: the multiplication of interfaces and technologies (entropy increasing over time). For the sake of maintenance, evolutions and performance, AREVA has decided a progressive modernization of its Nuclear Materials Management (NMM) information system. The underlying principle is a clear separation between the main functions: - Physical Follow-up, performed at the plant-level, - Regulatory Accountancy (for IRSN, EURATOM and IAEA safeguards), offering consolidation at the corporate level, - Patrimonial Accountancy (allocation of materials and conditioned wastes to AREVA's customers). The pivotal piece of this multi-year programme is the implementation of a dedicated data repository. We describe its main building blocks and demonstrate how it helps in managing changes to regulation, products, customers and

  17. Integration of Heterogeneous Information Sources into a Knowledge Resource Management System for Lifelong Learning

    NARCIS (Netherlands)

    Demidova, Elena; Ternier, Stefaan; Olmedilla, Daniel; Duval, Erik; Dicerto, Michele; Stefanov, Krassen; Sacristán, Naiara

    2007-01-01

    Demidova, E., Ternier, S., Olmedilla, D., Duval, E., Dicerto, M., Stefanov, K., et al. (2007). Integration of Heterogeneous Information Sources into a Knowledge Resource Management System for Lifelong. TENCompetence Workshop on Service Oriented Approaches and Lifelong Competence Development

  18. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  19. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  20. Global challenges in integrated coastal zone management

    DEFF Research Database (Denmark)

    integration of data and information in policy and management, combining expertise from nature and social science, to reach a balanced and sustainable development of the coastal zone. This important book comprises the proceedings of The International Symposium on Integrated Coastal Zone Management, which took....../mitigation to change in coastal systems Coastal governance Linking science and management Comprising a huge wealth of information, this timely and well-edited volume is essential reading for all those involved in coastal zone management around the globe. All libraries in research establishments and universities where...

  1. Integration and Evaluation of Automated Pavement Distress Data in INDOT’s Pavement Management System

    Science.gov (United States)

    2017-05-01

    This study was in two parts. The first part established and demonstrated a framework for pavement data integration. This is critical for fulfilling QC/QA needs of INDOTs pavement management system, because the precision of the physical location re...

  2. Integrated pest management and weed management in the United States and Canada.

    Science.gov (United States)

    Owen, Micheal D K; Beckie, Hugh J; Leeson, Julia Y; Norsworthy, Jason K; Steckel, Larry E

    2015-03-01

    There is interest in more diverse weed management tactics because of evolved herbicide resistance in important weeds in many US and Canadian crop systems. While herbicide resistance in weeds is not new, the issue has become critical because of the adoption of simple, convenient and inexpensive crop systems based on genetically engineered glyphosate-tolerant crop cultivars. Importantly, genetic engineering has not been a factor in rice and wheat, two globally important food crops. There are many tactics that help to mitigate herbicide resistance in weeds and should be widely adopted. Evolved herbicide resistance in key weeds has influenced a limited number of growers to include a more diverse suite of tactics to supplement existing herbicidal tactics. Most growers still emphasize herbicides, often to the exclusion of alternative tactics. Application of integrated pest management for weeds is better characterized as integrated weed management, and more typically integrated herbicide management. However, adoption of diverse weed management tactics is limited. Modifying herbicide use will not solve herbicide resistance in weeds, and the relief provided by different herbicide use practices is generally short-lived at best. More diversity of tactics for weed management must be incorporated in crop systems. © 2014 Society of Chemical Industry.

  3. Integrated System of Structural Health Monitoring and Intelligent Management for a Cable-Stayed Bridge

    Directory of Open Access Journals (Sweden)

    Bin Chen

    2014-01-01

    Full Text Available It is essential to construct structural health monitoring systems for large important bridges. Zhijiang Bridge is a cable-stayed bridge that was built recently over the Hangzhou Qiantang River (the largest river in Zhejiang Province. The length of Zhijiang Bridge is 478 m, which comprises an arched twin-tower space and a twin-cable plane structure. As an example, the present study describes the integrated system of structural health monitoring and intelligent management for Zhijiang Bridge, which comprises an information acquisition system, data management system, evaluation and decision-making system, and application service system. The monitoring components include the working environment of the bridge and various factors that affect bridge safety, such as the stress and strain of the main bridge structure, vibration, cable force, temperature, and wind speed. In addition, the integrated system includes a forecasting and decision-making module for real-time online evaluation, which provides warnings and makes decisions based on the monitoring information. From this, the monitoring information, evaluation results, maintenance decisions, and warning information can be input simultaneously into the bridge monitoring center and traffic emergency center to share the monitoring data, thereby facilitating evaluations and decision making using the system.

  4. Integrated solid waste management in megacities

    Directory of Open Access Journals (Sweden)

    M.A. Abdoli

    2016-05-01

    Full Text Available Rapid urbanization and industrialization, population growth and economic growth in developing countries make management of municipal solid waste more complex comparing with developed countries. Furthermore, the conventional municipal solid waste management approach often is reductionists, not tailored to handle complexity. Therefore, the need to a comprehensive and multi-disciplinary approach regarding the municipal solid waste management problems is increasing. The concept of integrated solid waste management is accepted for this aim all over the world. This paper analyzes the current situation as well as opportunities and challenges regarding municipal solid waste management in Isfahan according to the integrated solid waste management framework in six aspects: environmental, political/legal, institutional, socio-cultural, financial/economic, technical and performance aspects. Based on the results obtained in this analysis, the main suggestions for future integrated solid waste management of Isfahan are as i promoting financial sustainability by taking the solid waste fee and reducing the expenses through the promoting source collection of recyclable materials, ii improving compost quality and also marketing the compost products simultaneously, iii promoting the private sector involvements throughout the municipal solid waste management system.

  5. System Dynamics Modeling on Integrated Supply Chain Management of Potato Agribusiness

    Directory of Open Access Journals (Sweden)

    Lukman Hakim

    2017-12-01

    Full Text Available The objectives of this study is to design a model of integrated supply chain management of potato agribusiness in an effort to increase revenue and bargaining position of farmers in Aceh Province. The method applied to achieve these objectives was the methodology of system dynamics. Formulation of the models was conducted by using Vensim DSS Software, followed by simulation. The result of this study showed the role of five major scenarios which were important to actualize the integrated supply chain management of potato agribusiness in Aceh Province, those were: scenario 1, increasing the productive land area, resulting in the increasing of production volume; scenario 2, using the certified potato seed named “umbi G2”, generating the higher level of production; scenario 3, providing the certified potato seed based on the needs, showing that the quantity of production increased; scenario 4, shortening the payment receivables interval of farmers and cooperatives, which showing the increasing of cash amount; scenario 5, doing certification to the potato from synergistic partnerships farmers, showing the increasing of acceptance, profitability, R/C, and cash.

  6. Confidentiality and integrity in crowdsourcing systems

    CERN Document Server

    Ranj Bar, Amin

    2014-01-01

    Confidentiality and Integrity in Crowdsourcing Systems focuses on identity, privacy, and security related issues in crowdsourcing systems and in particular the confidentiality and integrity of online data created via crowdsourcing. This book begins with an introduction to crowdsourcing and then covers the privacy and security challenges of Confidentiality. The book examines integrity in these systems and the management and control of crowdsourcing systems.

  7. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  8. INTEGRATED SYSTEMS FOR PLANNING AND RESOURCES MANAGEMENT IN COMPANIES

    Directory of Open Access Journals (Sweden)

    Balaban Mihai

    2014-07-01

    Full Text Available Information is one of the most valuable resources of a company, since with it and around it the whole set of business processes unfold within companies. Till using internet companies were eager to find information that was necessary for the functioning and development of the company; now things have changed radically: the information is abundant and is provided through all possible channels; today, in order to thrive you have to „choose" and to filter the information to remain competitive on the market you are active on. The performance of an enterprise is influenced by its ability to adapt itself to the environment, by the effectiveness of its actions in capitalizing opportunities, by its ability to cope with adverse situations and risks. Information management is a process that analyzes the previously collected information and then the information is used by managers to make decisions or as a base for their decisions. Information in management is the information that is necessary for making managerial decisions. Distribution or Information Flow: in order for it to be used appropriately, information should be exchanged between the various participants in the project. Other parts involved in the project may also use this information in making their own decisions. This way they can help those who collect information to determine its usefulness for the management. For management, information is an integral part of monitoring because it is obtained during monitoring and helps in planning and implementing its activities. The problem and the reason of this study is to increase awareness of the need for implementation of ERP solutions, primarily, and secondly to share observations with regard to this issue as well as the evolution of acceptance and integration in Romania of such integrated solutions. The effectiveness of information management and knowledge management is urgently needed to assure a continuous organizational survival and the

  9. Energy implications of integrated solid waste management systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Little, R.E.; McClain, G.; Becker, M.; Ligon, P.; Shapiro, K.

    1994-07-01

    This study develops estimates of energy use and recovery from managing municipal solid waste (MSW) under various collection, processing, and disposal scenarios. We estimate use and recovery -- or energy balance -- resulting from MSW management activities such as waste collection, transport, processing, and disposal, as well as indirect use and recovery linked to secondary materials manufacturing using recycled materials. In our analysis, secondary materials manufacturing displaces virgin materials manufacturing for 13 representative products. Energy implications are expressed as coefficients that measure the net energy saving (or use) of displacing products made from virgin versus recycled materials. Using data developed for the 1992 New York City Master Plan as a starting point, we apply our method to an analysis of various collection systems and 30 types of facilities to illustrate bow energy balances shift as management systems are modified. In sum, all four scenarios show a positive energy balance indicating the energy and advantage of integrated systems versus reliance on one or few technology options. That is, energy produced or saved exceeds the energy used to operate the solid waste system. The largest energy use impacts are attributable to processing, including materials separation and composting. Collection and transportation energy are relatively minor contributors. The largest two contributors to net energy savings are waste combustion and energy saved by processing recycled versus virgin materials. An accompanying spatial analysis methodology allocates energy use and recovery to New York City, New York State outside the city, the U.S., and outside the U.S. Our analytical approach is embodied in a spreadsheet model that can be used by energy and solid waste analysts to estimate impacts of management scenarios at the state and substate level.

  10. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  11. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  12. The systems integration modeling system

    International Nuclear Information System (INIS)

    Danker, W.J.; Williams, J.R.

    1990-01-01

    This paper discusses the systems integration modeling system (SIMS), an analysis tool for the detailed evaluation of the structure and related performance of the Federal Waste Management System (FWMS) and its interface with waste generators. It's use for evaluations in support of system-level decisions as to FWMS configurations, the allocation, sizing, balancing and integration of functions among elements, and the establishment of system-preferred waste selection and sequencing methods and other operating strategies is presented. SIMS includes major analysis submodels which quantify the detailed characteristics of individual waste items, loaded casks and waste packages, simulate the detailed logistics of handling and processing discrete waste items and packages, and perform detailed cost evaluations

  13. Integrated weed management systems with herbicide-tolerant crops in the European Union: lessons learnt from home and abroad

    DEFF Research Database (Denmark)

    Lamichhane, Jay Ram; Devos, Yann; Beckie, Hugh J.

    2017-01-01

    of herbicide-tolerant (HT) crops further deplete farmland biodiversity and accelerate the evolution of herbicide-resistant (HR) weeds. Diversification in crop systems and weed management practices can enhance farmland biodiversity, and reduce the risk of weeds evolving herbicide resistance. Therefore, HT crops...... are most effective and sustainable as a component of an integrated weed management (IWM) system. IWM advocates the use of multiple effective strategies or tactics to manage weed populations in a manner that is economically and environmentally sound. In practice, however, the potential benefits of IWM...... with HT crops are seldom realized because a wide range of technical and socio-economic factors hamper the transition to IWM. Here, we discuss the major factors that limit the integration of HT crops and their associated farm management practices in IWM systems. Based on the experience gained in countries...

  14. The Integrated Waste Tracking Systems (IWTS) - A Comprehensive Waste Management Tool

    Energy Technology Data Exchange (ETDEWEB)

    Robert S. Anderson

    2005-09-01

    The US Department of Energy (DOE) Idaho National Laboratory (INL) site located near Idaho Falls, ID USA, has developed a comprehensive waste management and tracking tool that integrates multiple operational activities with characterization data from waste declaration through final waste disposition. The Integrated Waste Tracking System (IWTS) provides information necessary to help facility personnel properly manage their waste and demonstrate a wide range of legal and regulatory compliance. As a client?server database system, the IWTS is a proven tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of flexibility. This paper describes some of the history involved with the development and current use of IWTS as a comprehensive waste management tool as well as a discussion of IWTS deployments performed by the INL for outside clients. Waste management spans a wide range of activities including: work group interactions, regulatory compliance management, reporting, procedure management, and similar activities. The IWTS documents these activities and performs tasks in a computer-automated environment. Waste characterization data, container characterization data, shipments, waste processing, disposals, reporting, and limit compliance checks are just a few of the items that IWTS documents and performs to help waste management personnel perform their jobs. Throughout most hazardous and radioactive waste generating, storage and disposal sites, waste management is performed by many different groups of people in many facilities. Several organizations administer their areas of waste management using their own procedures and documentation independent of other organizations. Files are kept, some of which are treated as quality records, others not as stringent. Quality records maintain a history of: changes performed after approval, the reason for the change(s), and a record of whom and when

  15. Inter organizational System Management for integrated service delivery: an Enterprise Architecture Perspective

    OpenAIRE

    Elmir, Abir; Elmir, Badr; Bounabat, Bouchaib

    2015-01-01

    Service sharing is a prominent operating model to support business. Many large inter-organizational networks have implemented some form of value added integrated services in order to reach efficiency and to reduce costs sustainably. Coupling Service orientation with enterprise architecture paradigm is very important at improving organizational performance through business process optimization. Indeed, enterprise architecture management is increasingly discussed because of information system r...

  16. The Integrated Mode Management Interface

    Science.gov (United States)

    Hutchins, Edwin

    1996-01-01

    Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the

  17. Non-steady experimental investigation on an integrated thermal management system for power battery with phase change materials

    International Nuclear Information System (INIS)

    Shi, Shang; Xie, Yongqi; Li, Ming; Yuan, Yanping; Yu, Jianzu; Wu, Hongwei; Liu, Bin; Liu, Nan

    2017-01-01

    Highlights: • An integrated thermal management system for power battery is designed. • The battery temperature rise is a non-steady process for charge and discharge. • A mathematical model can accurately represent temperature rise characteristics. • The heat generation power of the battery is calculated theoretically. • The excess temperatures and thermal resistances affect the system performance. - Abstract: A large amount of heat inside the power battery must be dissipated to maintain the temperature in a safe range for the hybrid power train during high-current charging/discharging processes. In this article, a combined experimental and theoretical study has been conducted to investigate a newly designed thermal management system integrating phase change material with air cooling. An unsteady mathematical model was developed for the battery with the integrated thermal management system. Meanwhile, the heat generation power, thermal resistance, and time constant were calculated. The effect of several control parameters, such as thermal resistance, initial temperature, melting temperature and ambient temperature, on the performance of the integrated thermal management system were analyzed. The results indicated that: (1) the calculated temperature rise of the battery was in good agreement with the experimental data. The appropriate operation temperature of the battery was attained by the action of the phase change storage energy unit which is composed of copper foam and n-Eicosane, (2) the remarkable decrease of the battery temperature can be achieved by reducing the convection thermal resistance or increasing the conductivity of the phase change storage energy unit, where the latter could be the better option due to no additional energy consumption. When convective resistance and thermal resistance between the battery surface and the phase change storage energy unit are less than 2.03 K/W and 1.85 K/W, respectively, the battery will not exceed the

  18. An integrated and open source GIS environmental management system for a protected area in the south of Portugal

    Science.gov (United States)

    Teodoro, A.; Duarte, L.; Sillero, N.; Gonçalves, J. A.; Fonte, J.; Gonçalves-Seco, L.; Pinheiro da Luz, L. M.; dos Santos Beja, N. M. R.

    2015-10-01

    Herdade da Contenda (HC), located in Moura municipality, Beja district (Alentejo province) in the south of Portugal (southwestern Iberia Peninsula), is a national hunting area with 5270ha. The development of an integrated system that aims to make the management of the natural and cultural heritage resources will be very useful for an effective management of this area. This integrated system should include the physical characterization of the territory, natural conservation, land use and land management themes, as well the cultural heritage resources. This paper presents a new tool for an integrated environmental management system of the HC, which aims to produce maps under a GIS open source environment (QGIS). The application is composed by a single button which opens a window. The window is composed by twelve menus (File, DRASTIC, Forest Fire Risk, Revised Universal Soil Loss Equation (RUSLE), Bioclimatic Index, Cultural Heritage, Fauna and Flora, Ortofoto, Normalizes Difference Vegetation Index (NDVI), Digital Elevation Model (DEM), Land Use Land Cover Cover (LULC) and Help. Several inputs are requires to generate these maps, e.g. DEM, geologic information, soil map, hydraulic conductivity information, LULC map, vulnerability and economic information, NDVI. Six buttons were added to the toolbar which allows to manipulate the information in the map canvas: Zoom in, Zoom out, Pan, Print/Layout and Clear. This integrated and open source GIS environment management system was developed for the HC area, but could be easily adapted to other natural or protected area. Despite the lack of data, the methodology presented fulfills the objectives.

  19. Implementation of an integrity management program in a crude oil pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Maria; Tomasella, Marcelo [Oleoductos del Valle, General Roca (Argentina); Rossi, Juan; Pellicano, Adolfo [SINTEC S.A. , Mar del Plata, Buenos Aires (Argentina)

    2005-07-01

    The implementation of an Integrity Management Program (IMP) in a crude oil pipeline system is focused on the accomplishment of two primary corporative objectives: to increase safety operation margins and to optimize available resources. A proactive work philosophy ensures the safe and reliable operation of the pipeline in accordance with current legislation. The Integrity Management Program is accomplished by means of an interdisciplinary team that defines the strategic objectives that complement and are compatible with the corporative strategic business plan. The implementation of the program is based on the analysis of the risks due to external corrosion, third party damage, design and operations, and the definition of appropriate mitigation, inspection and monitoring actions, which will ensure long-term integrity of the assets. By means of a statistical propagation model of the external defects, reported by high-resolution magnetic inspection tool (MFL), together with the information provided by corrosion sensors, field repair interventions, close internal surveys and operation data, projected defect depth; remaining strength and failure probability distributions were obtained. From the analysis, feasible courses of action were established, including the inspection and repair plan, the internal inspection program and both corrosion monitoring and mitigation programs. (author)

  20. Distribution Integrity Management Plant (DIMP)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzales, Jerome F. [Los Alamos National Laboratory

    2012-05-07

    This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP{trademark}) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP{trademark} uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP{trademark} advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records

  1. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  2. Development of an integrated configuration management/flight director system for piloted STOL approaches

    Science.gov (United States)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1977-01-01

    A system analysis method for the development of an integrated configuration management/flight director system for IFR STOL approaches is presented. Curved descending decelerating approach trajectories are considered. Considerable emphasis is placed on satisfying the pilot centered requirements (acceptable workload) as well as the usual guidance and control requirements (acceptable performance). The Augmentor Wing Jet STOL Research Aircraft was utilized to allow illustration by example, and to validate the analysis procedure via manned simulation.

  3. Gaby: a computer-based support system for integrated pest management in Dutch apple orchards

    NARCIS (Netherlands)

    Ende, van den E.; Blommers, L.; Trapman, M.

    1996-01-01

    In The Netherlands, a computerized advisory system (called Gaby) for integrated pest management (IPM) in apple has been developed to support the decision making of individual fruit growers. Gaby provides clear monitoring recommendations when this is appropriate for a particular pest in (a defined

  4. Control system integration

    CERN Document Server

    Shea, T J

    2008-01-01

    This lecture begins with a definition of an accelerator control system, and then reviews the control system architectures that have been deployed at the larger accelerator facilities. This discussion naturally leads to identification of the major subsystems and their interfaces. We shall explore general strategies for integrating intelligent devices and signal processing subsystems based on gate arrays and programmable DSPs. The following topics will also be covered: physical packaging; timing and synchronization; local and global communication technologies; interfacing to machine protection systems; remote debugging; configuration management and source code control; and integration of commercial software tools. Several practical realizations will be presented.

  5. JACoW Integration of the vacuum SCADA with CERN's Enterprise Asset Management system

    CERN Document Server

    Rocha, Andre; Fraga, Jorge; Gkioka, Georgia; Gomes, Paulo; Gonzalez, Luis; Krastev, Tsvetelin; Riddone, Germana; Widegren, David

    2018-01-01

    With over 128Km of vacuum chambers, reaching pressures as low as in interstellar space, CERN is home to the largest vacuum system in the world. Its underlying architecture comprises approximately 15 000 pieces of control equipment, supervised and controlled by 7 Supervisory Control And Data Acquisition (SCADA) servers, and over 300 Programmable Logic Controllers (PLCs). Their configuration files are automatically generated from a set of ORACLE databases (vacDB) using a Java application (vacDB-Editor). The maintenance management of such an amount of equipment requires the usage of an Enterprise Asset Management system (EAM), where the life cycle of every equipment is tracked from reception through decommissioning. The equipment displayed in the vacuum SCADA is automatically integrated in its user interfaces (UIs) based on data available on vacDB. On the other hand, the equipment available in Infor-EAM for maintenance management activities (creation of work-orders, stock management, location tracking) resides i...

  6. Ground Operations Autonomous Control and Integrated Health Management

    Science.gov (United States)

    Daniels, James

    2014-01-01

    The Ground Operations Autonomous Control and Integrated Health Management plays a key role for future ground operations at NASA. The software that is integrated into this system is called G2 2011 Gensym. The purpose of this report is to describe the Ground Operations Autonomous Control and Integrated Health Management with the use of the G2 Gensym software and the G2 NASA toolkit for Integrated System Health Management (ISHM) which is a Computer Software Configuration Item (CSCI). The decision rationale for the use of the G2 platform is to develop a modular capability for ISHM and AC. Toolkit modules include knowledge bases that are generic and can be applied in any application domain module. That way, there's a maximization of reusability, maintainability, and systematic evolution, portability, and scalability. Engine modules are generic, while application modules represent the domain model of a specific application. Furthermore, the NASA toolkit, developed since 2006 (a set of modules), makes it possible to create application domain models quickly, using pre-defined objects that include sensors and components libraries for typical fluid, electrical, and mechanical systems.

  7. Risk and Work Configuration Management as a Function of Integrated Safety Management

    International Nuclear Information System (INIS)

    Lana Buehrer; Michele Kelly; Fran Lemieux; Fred Williams

    2007-01-01

    National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc

  8. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  9. Reforming the court management system of Romania in the European Union integration process

    Directory of Open Access Journals (Sweden)

    Nicolae Elvis Cioabă

    2014-11-01

    Full Text Available The Superior Council of Magistracy represent a cornerstone of the Romanian court management system. This responsibility is partly shared with the Ministry of Justice. The reform of the court management system in Romania has been and still is disputable, the main actors being on one hand the magistrates and on the other the Ministry of Justice. While observing this „dispute“ we may discover a third actor, namely the European Union, who has entered scene in the context of Romania’s European integration. This research is looking to plausibly explain which was the part played by the EU and how did it influence the above mentioned reform, with special emphasis on the Superior Council of Magistracy.

  10. Integrated operation and management system for a 700MW combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shiroumaru, I. (Yanai Power Plant Construction Office, Chugoku Electric Power Co., Inc., 1575-5 Yanai-Miyamoto-Shiohama, Yanai-shi, Yamaguchi-ken (JP)); Iwamiya, T. (Omika Works, Hitachi, Ltd., 5-2-1 Omika-cho, Hitachi-shi, Ibaraki-ken (JP)); Fukai, M. (Hitachi Works, Hitachi, Ltd., 3-1-1 Saiwai-cho, Hitachi-shi, Ibaraki-ken (JP))

    1992-03-01

    Yanai Power Plant of the Chugoku Electric Power Co., Inc. (Yamaguchi Pref., Japan) is in the process of constructing a 1400MW state-of-the-art combined cycle power plant. The first phase, a 350MW power plant, started operation on a commercial basis in November, 1990. This power plant has achieved high efficiency and high operability, major features of a combined cycle power plant. The integrated operation and management system of the power plant takes care of operation, maintenance, control of general business, etc., and was built using the latest computer and digital control and communication technologies. This paper reports that it is expected that this system will enhance efficient operation and management for the power plant.

  11. Integrated nursery pest management

    Science.gov (United States)

    R. Kasten Dumroese

    2012-01-01

    What is integrated pest management? Take a look at the definition of each word to better understand the concept. Two of the words (integrated and management) are relatively straightforward. Integrated means to blend pieces or concepts into a unified whole, and management is the wise use of techniques to successfully accomplish a desired outcome. A pest is any biotic (...

  12. Innovation Management in Emerging Technology Ventures – The Concept of an Integrated Idea Management

    DEFF Research Database (Denmark)

    Brem, Alexander; Voigt, K.-I.

    2007-01-01

    , development and sales. Here especially, differentiating potentials are offered for emerging technology ventures. But it is important that idea and innovation management are integrated during the building-up stage while internal and external network structures are still manageable and often consist...... of the managers' and founders' personal contacts. Hence, the earlier an integrated idea management is implemented, the greater is the probability of high numbers of successful innovations.......For decades, suggestion systems have been used to include employees in the innovation process. However, in order to gather superior ideas, integrating external stakeholders is critical to the innovation success. Within this paper, the authors derive a sophisticated model of an integrated idea...

  13. Technical Evaluation Report 29: Integrated Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Linda Schwartz

    2004-04-01

    Full Text Available Four integrated learning management packages were reviewed: CentraOne, IntraLearn, Lyceum, and Silicon Chalk. These products provide different combinations of synchronous and asynchronous tools. The current report examines the products in relation to their specific value for distance educators and students.

  14. Implementing an integrated standards-based management system to ensure compliance at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Hjeresen, D.; Roybal, S.; Bertino, P.; Gherman, C.; Hosteny, B.

    1995-01-01

    Los Alamos National Laboratory (LANL or the Laboratory) is developing and implementing a comprehensive, Integrated Standards-Based Management System (ISBMS) to enhance environmental, safety, and health (ESH) compliance efforts and streamline management of ESH throughout the Laboratory. The Laboratory recognizes that to be competitive in today's business environment and attractive to potential Partnerships, Laboratory operations must be efficient and cost-effective. The Laboratory also realizes potential growth opportunities for developing ESH as a strength in providing new or improved services to its customers. Overall, the Laboratory desires to establish and build upon an ESH management system which ensures continuous improvement in protecting public health and safety and the environment and which fosters a working relationship with stakeholders. A team of process experts from the LANL Environmental Management (EM) Program Office, worked with management system consultants, and the Department of Energy (DOE) to develop an ESH management systems process to compare current LANL ESH management Systems and programs against leading industry standards. The process enabled the Laboratory to gauge its performance in each of the following areas: Planning and Policy Setting; Systems and Procedures; Implementation and Education; and Monitoring and Reporting. The information gathered on ESH management systems enabled LANL to pinpoint and prioritize opportunities for improvement in the provision of ESH services throughout the Laboratory and ultimately overall ESH compliance

  15. The Complementary Perspective of System of Systems in Collaboration, Integration, and Logistics: A Value-Chain Based Paradigm of Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Raed Jaradat

    2017-10-01

    Full Text Available The importance and complexity of the problems associated with coordinating multiple organizations to configure value propositions for customers has drawn the attention of multiple disciplines. In an effort to clarify and consolidate terms, this conceptual research examines both supply chain management (SCM and system of systems (SoS literature to postulate, from a value-chain perspective, what roles integration and collaboration play in helping supply chains satisfy customer requirements. A literature review analysis was used to identify the commonalities and differences between supply chain management and system of systems approaches to examining interfirm coordination of value creation efforts. Although a framework of integration and collaboration roles in value creation is proposed, further empirical testing of the concept is required to substantiate initial conclusions. The concepts proposed may help clarify where strategic and operational managers need to focus their efforts in coordinating supply chain member firms. The incorporation of SoS engineering into the supply chain field will draw the linkage between the constituent principles, and concepts of Systems Theory as appropriate for the supply chain management field. This is the first effort to reconcile two separate but parallel scholarship streams examining the coordination of multiple organizations in value creation. This research shows that there are some methodologies, principles, and methods from the SoS field that can supplement supply chain management research. Mainly due to a unit of analysis issue, systems based approaches have not been in the mainstream of supply chain management field development.

  16. Asset management -- Integrated software optimizes production performance

    International Nuclear Information System (INIS)

    Polczer, S.

    1998-01-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle's universal data server software development tools with ATS's upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting

  17. Asset management -- Integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-10-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server software development tools with ATS`s upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting.

  18. INNOVATION DEVELOPMENT MANAGEMENT IN VERTICALLY INTEGRATED HOLDING COMPANY

    Directory of Open Access Journals (Sweden)

    Natalya T. Uspenskaja

    2015-01-01

    Full Text Available The trend towards production consolidation and integration processes taking place both in the Russian and global economies leads to development of business associations, with a holding company being the most common form inRussiaand around the globe. The evidence in favor of the formation of holding companies is that they can benefit from the scale (bulk purchasing, centralized stuff training; in the global capital and exports markets they can be more effective than smaller businesses and, if non-profitable, a loss-making structure is easier to liquidate than the entire company; holding companies and associations can be an effective defender from political interference. As the importance of the well-functioning and harmonized procedure for the companies’ integration will increase (especially in the context of Russian business, where specific features of many areas of the production system imply the use of holding oligopolies as the most effective form of market structures, there is a need in their more profound study and, in particular, in the analysis of the most important technologies of the general integration procedure. The article outlines the relevance of innovative development management of vertically integrated holding systems, lists principles of innovative activity management and considers the features of innovation management of a vertically integrated holding company. The objective of the research is to study theoretical and practical aspects of innovative development management in vertically integrated holding systems. The object of research is management structures in innovative holding companies. While working on the article, the following methods of economic research were used: abstract and logical method, empirical method, method of expert evaluations, as well as methods of structural and functional and statistical analysis. 

  19. A Decision Support System for integrated tourism development: Rethinking tourism policies and management strategies

    Czech Academy of Sciences Publication Activity Database

    Bousset, J. P.; Skuras, D.; Těšitel, Jan; Marsat, J. B.; Petrou, A.; Fiallo-Pantziou, E.; Kušová, Drahomíra; Bartoš, Michael

    2007-01-01

    Roč. 9, č. 4 (2007), s. 387-404 ISSN 1461-6688 Grant - others:-(XE) QLK5-CT-2000-01211-SPRITE Institutional research plan: CEZ:AV0Z60870520 Keywords : Integrated tourism * policy formulation * participatory approaches * simulation models * decision support system Subject RIV: AE - Management ; Administration

  20. Optimal Real-time Dispatch for Integrated Energy Systems

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Guerrero, Josep M.; Rahimi-Kian, Ashkan

    2016-01-01

    With the emerging of small-scale integrated energy systems (IESs), there are significant potentials to increase the functionality of a typical demand-side management (DSM) strategy and typical implementation of building-level distributed energy resources (DERs). By integrating DSM and DERs...... into a cohesive, networked package that fully utilizes smart energy-efficient end-use devices, advanced building control/automation systems, and integrated communications architectures, it is possible to efficiently manage energy and comfort at the end-use location. In this paper, an ontology-driven multi......-agent control system with intelligent optimizers is proposed for optimal real-time dispatch of an integrated building and microgrid system considering coordinated demand response (DR) and DERs management. The optimal dispatch problem is formulated as a mixed integer nonlinear programing problem (MINLP...

  1. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  2. Integrated Flood Forecast and Virtual Dam Operation System for Water Resources and Flood Risk Management

    Science.gov (United States)

    Shibuo, Yoshihiro; Ikoma, Eiji; Lawford, Peter; Oyanagi, Misa; Kanauchi, Shizu; Koudelova, Petra; Kitsuregawa, Masaru; Koike, Toshio

    2014-05-01

    While availability of hydrological- and hydrometeorological data shows growing tendency and advanced modeling techniques are emerging, such newly available data and advanced models may not always be applied in the field of decision-making. In this study we present an integrated system of ensemble streamflow forecast (ESP) and virtual dam simulator, which is designed to support river and dam manager's decision making. The system consists of three main functions: real time hydrological model, ESP model, and dam simulator model. In the real time model, the system simulates current condition of river basins, such as soil moisture and river discharges, using LSM coupled distributed hydrological model. The ESP model takes initial condition from the real time model's output and generates ESP, based on numerical weather prediction. The dam simulator model provides virtual dam operation and users can experience impact of dam control on remaining reservoir volume and downstream flood under the anticipated flood forecast. Thus the river and dam managers shall be able to evaluate benefit of priori dam release and flood risk reduction at the same time, on real time basis. Furthermore the system has been developed under the concept of data and models integration, and it is coupled with Data Integration and Analysis System (DIAS) - a Japanese national project for integrating and analyzing massive amount of observational and model data. Therefore it has advantage in direct use of miscellaneous data from point/radar-derived observation, numerical weather prediction output, to satellite imagery stored in data archive. Output of the system is accessible over the web interface, making information available with relative ease, e.g. from ordinary PC to mobile devices. We have been applying the system to the Upper Tone region, located northwest from Tokyo metropolitan area, and we show application example of the system in recent flood events caused by typhoons.

  3. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  4. Integrated management system: expedience and organizational aspects

    Directory of Open Access Journals (Sweden)

    Trunova Ekaterina Viktorovna

    2011-06-01

    Full Text Available The correctly lined up management system is an important element of intellectual capital of company and promotes growth of its market value. In the article grounded, that realization of strategy is impossible without intercommunication of strategic management and business-process management. Such organizational aspects of administrative activity, as role conception of management, strategic office and process office, are observed.

  5. A novel personal health system with integrated decision support and guidance for the management of chronic liver disease.

    Science.gov (United States)

    Kiefer, Stephan; Schäfer, Michael; Bransch, Marco; Brimmers, Peter; Bartolomé, Diego; Baños, Janie; Orr, James; Jones, Dave; Jara, Maximilian; Stockmann, Martin

    2014-01-01

    A personal health system platform for the management of patients with chronic liver disease that incorporates a novel approach to integrate decision support and guidance through care pathways for patients and their doctors is presented in this paper. The personal health system incorporates an integrated decision support engine that guides patients and doctors through the management of the disease by issuing tasks and providing recommendations to both the care team and the patient and by controlling the execution of a Care Flow Plan based on the results of tasks and the monitored health status of the patient. This Care Flow Plan represents a formal, business process based model of disease management designed off-line by domain experts on the basis of clinical guidelines, knowledge of care pathways and an organisational model for integrated, patient-centred care. In this way, remote monitoring and treatment are dynamically adapted to the patient's actual condition and clinical symptoms and allow flexible delivery of care with close integration of specialists, therapists and care-givers.

  6. OpenDanubia - An integrated, modular simulation system to support regional water resource management

    Science.gov (United States)

    Muerth, M.; Waldmann, D.; Heinzeller, C.; Hennicker, R.; Mauser, W.

    2012-04-01

    The already completed, multi-disciplinary research project GLOWA-Danube has developed a regional scale, integrated modeling system, which was successfully applied on the 77,000 km2 Upper Danube basin to investigate the impact of Global Change on both the natural and anthropogenic water cycle. At the end of the last project phase, the integrated modeling system was transferred into the open source project OpenDanubia, which now provides both the core system as well as all major model components to the general public. First, this will enable decision makers from government, business and management to use OpenDanubia as a tool for proactive management of water resources in the context of global change. Secondly, the model framework to support integrated simulations and all simulation models developed for OpenDanubia in the scope of GLOWA-Danube are further available for future developments and research questions. OpenDanubia allows for the investigation of water-related scenarios considering different ecological and economic aspects to support both scientists and policy makers to design policies for sustainable environmental management. OpenDanubia is designed as a framework-based, distributed system. The model system couples spatially distributed physical and socio-economic process during run-time, taking into account their mutual influence. To simulate the potential future impacts of Global Change on agriculture, industrial production, water supply, households and tourism businesses, so-called deep actor models are implemented in OpenDanubia. All important water-related fluxes and storages in the natural environment are implemented in OpenDanubia as spatially explicit, process-based modules. This includes the land surface water and energy balance, dynamic plant water uptake, ground water recharge and flow as well as river routing and reservoirs. Although the complete system is relatively demanding on data requirements and hardware requirements, the modular structure

  7. Smart Sensors' Role in Integrated System Health Management

    Science.gov (United States)

    Perotti, Jose M.; Mata, Carlos

    2005-01-01

    During the last decade, there has been a major effort in the aerospace industry to reduce the cost per pond of payload and become competitive in the international market. Competition from Europe, Japan, and China has reduced this cost to almost a third from 1990 to 2000. This cost has leveled in recent years to an average price of around $12,000/pound of payload. One of NASA's goals is to promote the development of technologies to reduce this cost by a factor of 10 or more Exploration of space, specially manned exploration missions, involves very complex launch and flight vehicles, associated ground support systems, and extensive human support during all phases of the mission. When considering the Space Shuttle Program, we can see that vehicle and ground support systems' processing, operation, and maintenance represent a large percentage of the program cost and time. Reducing operating, processing and maintenance costs will greatly reduce the cost of Exploration programs. The Integrated System Health Management (ISHM) concept is one of the technologies that will help reduce these operating, processing and maintenance costs. ISHM is an integrated health monitoring system applicable to both flight and ground systems. It automatically and autonomously acquires information from sensors and actuators and processes that information using the ISHM-embedded knowledge. As a result, it establishes the health of the system based on the acquired information and its prior knowledge. When this concept is fully implemented, ISHM systems shall be able to perform failure prediction and remediation before actual hard failures occurs, preventing its costly consequences. Data sources, sensors, and their associated data acquisition systems, constitute the foundation of the system. A smart sensing architecture is required to support the acquisition of reliable, high quality data, required by the ISHM. A thorough definition of the smart sensor architectures, their embedded diagnostic

  8. Integrated water and waste management system for future spacecraft

    Science.gov (United States)

    Ingelfinger, A. L.; Murray, R. W.

    1974-01-01

    Over 200 days of continuous testing have been completed on an integrated waste management-water recovery system developed by General Electric under a jointly funded AEC/NASA/AF Contract. The 4 man system provides urine, feces, and trash collection; water reclamation; storage, heating and dispensing of the water; storage and disposal of the feces and urine residue and all of other nonmetallic waste material by incineration. The heat required for the 1200 deg F purification processes is provided by a single 420-w radioisotope heater. A second 836-w radioisotope heater supplemented by 720 w of electrical heat provides for distillation and water heating. Significant test results are no pre-or-post treatment, greater than 98 per cent potable water recovery, approximately 95 per cent reduction in solids weight and volume, all outflows are sterile with the water having no bacteria or virus, and the radioisotope capsule radiation level is only 7.9 mrem/hr unshielded at 1 m (neutrons and gamma).

  9. A prototype informatics system integrating weather and health data to manage meningitis

    Science.gov (United States)

    Pandya, R.; Yoksas, T.; Hayden, M.; Hopson, T.; Laing, A.; Lazo, J.; Warner, T.; Rice, J.; Adams-Forgor, A.; Hodgson, A.; Semazzi, F.; Mera, R.; Thomson, M.; Trzaska, S.; Lamptey, B.

    2009-04-01

    This presentation will describe progress in developing the informatics system that will support a newly funded project designed to integrate health and environmental data for health-related decision-making in Africa. This infromatics system supports a project in which the University Corporation for Atmospheric Research (UCAR), the International Research Institute for Climate and Society, and North Carolina State University in the United States, and the Navrongo Health Research Centre in Ghana will build and implement a prototype decision-support system that integrates two- to 14-day weather forecasts and epidemiological data to provide actionable information that can be used to contain the spread of meningitis epidemics in Ghana. By applying a preliminary economic evaluation of this decision support system, we will also assess the potential benefit of using environmental data to improve public health outcomes, help prioritize continuing investment in meningitis management in Ghana and throughout the Meningitis Belt, and determine the appropriateness of extending the prototype to other diseases, nations, and continents. This effort is a small piece of an overall Google.org effort to develop an Earth-gauging System that will integrate environmental, health and development data into products that stakeholders and researchers can use to monitor variables, analyze trends and identify relationships among different variables. The Earth-gauging System will support the prediction of emerging threats, and provide the basis for an robust early-warning system that will improve health, food security, and development and conservation outcomes. For the informatics session, our presentation will focus on the projects' leveraging of current UCAR Unidata data management software to create and populate an archive of meteorological and epidemiological data. We will also describe strategies to extend the Unidata network for data distribution - which currently provides real-time access

  10. Science of Integrated Approaches to Natural Resources Management

    Science.gov (United States)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and

  11. Integrating an Information Literacy Quiz into the Learning Management System

    Science.gov (United States)

    Lowe, M. Sara; Booth, Char; Tagge, Natalie; Stone, Sean

    2014-01-01

    The Claremont Colleges Library Instruction Services Department developed a quiz that could be integrated into the consortial learning management software to accompany a local online, open-source information literacy tutorial. The quiz is integrated into individual course pages, allowing students to receive a grade for completion and improving…

  12. Integrating adaptive management and ecosystem services concepts to improve natural resource management: Challenges and opportunities

    Science.gov (United States)

    Epanchin-Niell, Rebecca S.; Boyd, James W.; Macauley, Molly K.; Scarlett, Lynn; Shapiro, Carl D.; Williams, Byron K.

    2018-05-07

    Executive Summary—OverviewNatural resource managers must make decisions that affect broad-scale ecosystem processes involving large spatial areas, complex biophysical interactions, numerous competing stakeholder interests, and highly uncertain outcomes. Natural and social science information and analyses are widely recognized as important for informing effective management. Chief among the systematic approaches for improving the integration of science into natural resource management are two emergent science concepts, adaptive management and ecosystem services. Adaptive management (also referred to as “adaptive decision making”) is a deliberate process of learning by doing that focuses on reducing uncertainties about management outcomes and system responses to improve management over time. Ecosystem services is a conceptual framework that refers to the attributes and outputs of ecosystems (and their components and functions) that have value for humans.This report explores how ecosystem services can be moved from concept into practice through connection to a decision framework—adaptive management—that accounts for inherent uncertainties. Simultaneously, the report examines the value of incorporating ecosystem services framing and concepts into adaptive management efforts.Adaptive management and ecosystem services analyses have not typically been used jointly in decision making. However, as frameworks, they have a natural—but to date underexplored—affinity. Both are policy and decision oriented in that they attempt to represent the consequences of resource management choices on outcomes of interest to stakeholders. Both adaptive management and ecosystem services analysis take an empirical approach to the analysis of ecological systems. This systems orientation is a byproduct of the fact that natural resource actions affect ecosystems—and corresponding societal outcomes—often across large geographic scales. Moreover, because both frameworks focus on

  13. Optimal Energy Management for the Integrated Power and Gas Systems via Real-time Pricing

    DEFF Research Database (Denmark)

    Shu, KangAn; Ai, Xiaomeng; Wen, Jinyu

    2018-01-01

    This work proposed a bi-level formulation for energy management in the integrated power and natural gas system via real-time price signals. The upper-level problem minimizes the operational cost, in which dynamic electricity price and dynamic gas tariff are proposed. The lower level problem...... and P2Gs plants follow the system operator’s preferences such as wind power accommodation, mitigation of unsupplied load and relieving the network congestion....

  14. Integrating cost information with health management support system: an enhanced methodology to assess health care quality drivers.

    Science.gov (United States)

    Kohli, R; Tan, J K; Piontek, F A; Ziege, D E; Groot, H

    1999-08-01

    Changes in health care delivery, reimbursement schemes, and organizational structure have required health organizations to manage the costs of providing patient care while maintaining high levels of clinical and patient satisfaction outcomes. Today, cost information, clinical outcomes, and patient satisfaction results must become more fully integrated if strategic competitiveness and benefits are to be realized in health management decision making, especially in multi-entity organizational settings. Unfortunately, traditional administrative and financial systems are not well equipped to cater to such information needs. This article presents a framework for the acquisition, generation, analysis, and reporting of cost information with clinical outcomes and patient satisfaction in the context of evolving health management and decision-support system technology. More specifically, the article focuses on an enhanced costing methodology for determining and producing improved, integrated cost-outcomes information. Implementation issues and areas for future research in cost-information management and decision-support domains are also discussed.

  15. Integration of structural health monitoring and asset management.

    Science.gov (United States)

    2012-08-01

    This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...

  16. Integrated Approach to User Account Management

    Science.gov (United States)

    Kesselman, Glenn; Smith, William

    2007-01-01

    IT environments consist of both Windows and other platforms. Providing user account management for this model has become increasingly diffi cult. If Microsoft#s Active Directory could be enhanced to extend a W indows identity for authentication services for Unix, Linux, Java and Macintosh systems, then an integrated approach to user account manag ement could be realized.

  17. Information Systems Integration and Enterprise Application Integration (EAI) Adoption: A Case from Financial Services

    Science.gov (United States)

    Lam, Wing

    2007-01-01

    Increasingly, organizations find that they need to integrate large number of information systems in order to support enterprise-wide business initiatives such as e-business, supply chain management and customer relationship management. To date, organizations have largely tended to address information systems (IS) integration in an ad-hoc manner.…

  18. IMPORTANCE OF INTEGRATED MANAGEMENT SYSTEM APPLIED IN HEALTH ESTABLISHMENTS IN ORDER TO RAISE TREATMENT QUALITY.

    Science.gov (United States)

    Dodić, Biljana; Miljković, Tatjana; Bjelobrk, Marija; Cemerlic Ađić, Nada; Ađić, Filip; Dodić, Slobodan

    2016-01-01

    The term "management" is best characterized as "managing" economic or social processes to achieve objectives through a rational use of material and immaterial resources by applying the principles, functions, and management methods. This study has been aimed at evaluating the value of an integrated quality management system implemented at the Institute of Cardiovascular Diseases of Vojvodina to improve the quality of treatment. In the period from 2008 to 2010 about 40 employees from the Institute of Cardiovascular Diseases of Vojvodina attended various courses given by the lecturers of the Faculty of Technical Sciences, where the function and significance of the "International Standards Organization" were explained, after which standards of interest were implemented at the Institute of Cardiovascular Diseases of Vojvodina. The Department of Cardiology has introduced 11 cardiac procedures with 5 special instructions, 14 general procedures, and 7 specific procedures with 2 instructions. The Department of Cardiac Surgery has introduced 7 procedures to be implemented. The "Vojvodina score" model was put into practice for the perioperative evaluation of cardiac surgery risk. During 2014, the Institute of Cardiovascular Diseases ofVojvodina obtained accreditation for the period of 7 years. The integrated quality management system must be applied in order to achieve a high level of health care in the shortest possible time and with the least possible consumption of material and human resources. The application of this system in practice gives a realistic insight into the working processes and facilitates their functioning. It demands and requires constant monitoring of the system efficiency along with continuous changes and improvements of all elements of the working processes and functional units.

  19. Implementation of an Integrated Information Management System at the National Library of Wales: A Case Study

    Science.gov (United States)

    Evans, Manon Foster; Thomas, Sian

    2007-01-01

    Purpose: This paper aims to describe the experiences of the National Library of Wales in implementing an integrated information management system. Design/methodology/approach: Discusses the stages involved in the procurement process, data migration and general system implementation. Findings: Emphasises the need for a well-prepared yet flexible…

  20. Nova laser assurance-management system

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Nova assurance management system was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management system. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  1. Integrating observational and modelling systems for the management of the Great Barrier Reef

    Science.gov (United States)

    Baird, M. E.; Jones, E. M.; Margvelashvili, N.; Mongin, M.; Rizwi, F.; Robson, B.; Schroeder, T.; Skerratt, J.; Steven, A. D.; Wild-Allen, K.

    2016-02-01

    Observational and modelling systems provide two sources of knowledge that must be combined to provide a more complete view than either observations or models alone can provide. Here we describe the eReefs coupled hydrodynamic, sediment and biogeochemical model that has been developed for the Great Barrier Reef; and the multiple observations that are used to constrain the model. Two contrasting examples of model - observational integration are highlighted. First we explore the carbon chemistry of the waters above the reef, for which observations are accurate, but expensive and therefore sparse, while model behaviour is highly skilful. For carbon chemistry, observations are used to constrain model parameterisation and quantify model error, with the model output itself providing the most useable knowledge for management purposes. In contrast, ocean colour provides inaccurate, but cheap and spatially and temporally extensive observations. Thus observations are best combined with the model in a data assimilating framework, where a custom-designed optical model has been developed for the purposes of incorporating ocean colour observations. The future management of Great Barrier Reef water quality will be based on an integration of observing and modelling systems, providing the most robust information available.

  2. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  3. Experimental investigation on an integrated thermal management system with heat pipe heat exchanger for electric vehicle

    International Nuclear Information System (INIS)

    Zou, Huiming; Wang, Wei; Zhang, Guiying; Qin, Fei; Tian, Changqing; Yan, Yuying

    2016-01-01

    Highlights: • An integrated thermal management system is proposed for electric vehicle. • The parallel branch of battery chiller can supply additional cooling capacity. • Heat pipe performance on preheating mode is better than that on cooling mode. • Heat pipe heat exchanger is a feasible choice for battery thermal management. - Abstract: An integrated thermal management system combining a heat pipe battery cooling/preheating system with the heat pump air conditioning system is presented to fulfill the comprehensive energy utilization for electric vehicles. A test bench with battery heat pipe heat exchanger and heat pump air conditioning for a regular five-chair electric car is set up to research the performance of this integrated system under different working conditions. The investigation results show that as the system is designed to meet the basic cabinet cooling demand, the additional parallel branch of battery chiller is a good way to solve the battery group cooling problem, which can supply about 20% additional cooling capacity without input power increase. Its coefficient of performance for cabinet heating is around 1.34 at −20 °C out-car temperature and 20 °C in-car temperature. The specific heat of the battery group is tested about 1.24 kJ/kg °C. There exists a necessary temperature condition for the heat pipe heat exchanger to start action. The heat pipe heat transfer performance is around 0.87 W/°C on cooling mode and 1.11 W/°C on preheating mode. The gravity role makes the heat transfer performance of the heat pipe on preheating mode better than that on cooling mode.

  4. Intellectual capital management as the integral part of enterprise’s management

    OpenAIRE

    Аліна Олександрівна Осаул

    2016-01-01

    The main levels of the enterprise’s intellectual capital management are analyzed in the article. The distinctive peculiarities of the enterprise’s intellectual capital management are mentioned. Goals and benefits of the intellectual management system are determined. The ways of their improvement are pointed out. Implicit and explicit knowledge as an important integral intellectual capital resources are divided and characterized

  5. Integrated outage management: Leveraging utility system assets including GIS and AMR for optimum outage response

    Energy Technology Data Exchange (ETDEWEB)

    Finamore, E. P.

    2004-02-01

    The control of electrical system outages is discussed. The principal argument advanced is that traditional stand-alone methods of outage response will no longer get the job done without utility companies integrating their outage management systems with other system assets such as GIS (geographic information system) and AMR (advanced metering systems). Many meter reading systems, while primarily supporting customer billing, can also provide outage alarm and some are also capable of service restoration notification, which is an invaluable benefit to service operators since it obviates the need for verifying system restoration by labour-intensive on-site visits or customer call-backs. If successfully leveraged, optimization of all utility assets and improvements in labour productivity can results in improved outage management performance gains without affecting performance in other areas.

  6. Power Management Integrated Circuit for Indoor Photovoltaic Energy Harvesting System

    Science.gov (United States)

    Jain, Vipul

    In today's world, power dissipation is a main concern for battery operated mobile devices. Key design decisions are being governed by power rather than area/delay because power requirements are growing more stringent every year. Hence, a hybrid power management system is proposed, which uses both a solar panel to harvest energy from indoor lighting and a battery to power the load. The system tracks the maximum power point of the solar panel and regulates the battery and microcontroller output load voltages through the use of an on-chip switched-capacitor DC-DC converter. System performance is verified through simulation at the 180nm technology node and is made to be integrated on-chip with 0.25 second startup time, 79% efficiency, --8/+14% ripple on the load, an average 1micro A of quiescent current (3.7micro W of power) and total on-chip area of 1.8mm2 .

  7. Integrating environment health and safety management at Petro-Canada

    International Nuclear Information System (INIS)

    Raymond, G.

    1993-01-01

    Petro-Canada has developed a tool to integrate, measure, and improve its management systems of environment, health, and safety (EH ampersand S). This tool, called the Total Loss Management System, is described in the areas of general management issues, policies and procedures, evaluations, organization, stewardship, issue management, and performance measures. Petro-Canada's policies on occupational health and safety are consistent with its environmental policy, being structured in the same way. An integrated audit system is used to cover health, safety, industrial hygiene, reliability, environment, and risk management. EH ampersand S matters are integrated at the corporate level in a separate department. Regional divisions review EH ampersand S performance every month, incidents are discussed, and preventive measures are taken as necessary. Regional performances are combined every quarter for ultimate presentation to the Petro-Canada board. New or emerging issues that may affect divisions are assigned an issue sponsor, a member of divisional management who makes sure the issue receives the resources necessary to study and define its impact. Examples of issues include soil contamination, process hazard management, and benzene exposure limits. Performance measures flow from the corporate environment and occupational health and safety policies, and come in two types: those that measure activities to improve performance and those that measure the outcome of the activities

  8. Critical factors in the implementation process of integrated management systems

    Directory of Open Access Journals (Sweden)

    Ademir Antonio Ferreira

    2015-09-01

    Full Text Available This study is the result of research whose purpose was to study the implementation process of integrated management systems, called ERP Enterprise Resource Planning in the business environment. This study, more specifically, tried to identify the variables in this process and that, somehow, made it easy or caused some type of difficulty implementing the system. Based on the mixed method approach (Creswell, 2003, the study was performed by means of the content analysis of technical and scientific publications about this theme and by means of a field research for data collection from primary sources. The content analysis was based on the per mile procedure by Bardin (1977, making it possible to identify critical factors that may be found in the implementation of ERP system projects. Primary data was collected from structured interviews with the managers in charge of the implementation of the system, in each of the 12 companies in different sectors of the economy and based in Brazil. Based on this information, it was possible to test the factors extracted from the content analysis and then develop a list of factors that may effectively influence the implementation process of the system. In order to recognize the possible relations between the selected factors, the Spearman (rsp correlation coefficient was applied and the multiple regression analysis was performed by means of the stepwise procedure. The purpose of the regression analysis was to determine the relation of the “Assessment of the Implementation” dependent variable with other dependent variables in the selected categories. The results of these analyses showed that the support of the top management, the communication process for the clear evidence of this support, the technical support of the ERP program provider together with the project team expertise, training and qualification processes of the team in the system operation are significantly correlated and relevant factors for a

  9. Perspectives on integrating the US radioactive waste disposal system

    International Nuclear Information System (INIS)

    Culler, F.L.; Croff, A.G.

    1990-01-01

    The waste management systems being developed and deployed by the DOE Office of Civilian Radioactive Waste Management (OCRWM) is large, complex, decentralized, and long term. As a result, a systems integration approach has been implemented by OCRWM. The fundamentals of systems integration and its application are examined in the context of the OCRWM program. This application is commendable, and some additional systems integration features are suggested to enhance its benefits. 6 refs., 1 fig

  10. Integrated and ecosystemic approaches for bridging the gap between environmental management and port management.

    Science.gov (United States)

    García-Onetti, Javier; Scherer, Marinez E G; Barragán, Juan Manuel

    2018-01-15

    The rapid exploitation of coastal and marine ecosystemic capital is on course to reach a critical point. The difficulty of implementing Integrated and ecosystem based management models, taking into the account the great complexity of the marine socio-ecological systems, has resulted in a significant gap between theory and practice. The majority of authors emphasize difficulties in engaging and convincing private stakeholders and a number of economic sectors involved in these processes. This reticence is traditionally more pronounced in the port sector, despite their important role in the transformation of coastal and marine areas. This paper seeks to establish bridges between the Environmental Management systems and Tools (EMT) of economic sectors and the Integrated and Ecosystem Based Management models (IEBM). To achieve this goal, an effort has been made to rethink concepts and principles traditionally used in EMT to bring them into line with those of IEBM. A DPSIR adapted framework is proposed and applied in a conceptual model, where the necessary elements for environmental management tools and ecosystemic models coexist. The logic of ecosystem services has been included, with special attention to the variable of human behaviour. How the proposals fit into the reality of the maritime-port sector was analysed in a transversal way, seeking Socio-Ecological Port System (SEPS) perspectives. This made it possible to move from Environmental Management Systems to an Integrated and Ecosystem Based Port Environmental Management System (PEMS-IEB). From a managerial perspective, it was also suggested that an additional DPSIR framework should be applied to the "response" component, the management system itself, understood as a system with its own elements, processes and interrelations. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. GIBSI: an integrated modelling system for watershed management – sample applications and current developments

    Directory of Open Access Journals (Sweden)

    A. N. Rousseau

    2007-11-01

    Full Text Available Hydrological and pollutant fate models have long been developed for research purposes. Today, they find an application in integrated watershed management, as decision support systems (DSS. GIBSI is such a DSS designed to assist stakeholders in watershed management. It includes a watershed database coupled to a GIS and accessible through a user-friendly interface, as well as modelling tools that simulate, on a daily time step, hydrological processes such as evapotranspiration, runoff, soil erosion, agricultural pollutant transport and surface water quality. Therefore, GIBSI can be used to assess a priori the effect of management scenarios (reservoirs, land use, waste water effluents, diffuse sources of pollution that is agricultural pollution on surface hydrology and water quality. For illustration purposes, this paper presents several management-oriented applications using GIBSI on the 6680 km2 Chaudière River watershed, located near Quebec City (Canada. They include impact assessments of: (i municipal clean water program; (ii agricultural nutrient management scenarios; (iii past and future land use changes, as well as (iv determination of achievable performance standards of pesticides management practices. Current and future developments of GIBSI are also presented as these will extend current uses of this tool and make it useable and applicable by stakeholders on other watersheds. Finally, the conclusion emphasizes some of the challenges that remain for a better use of DSS in integrated watershed management.

  12. System engineering approach in the EU Test Blanket Systems Design Integration

    International Nuclear Information System (INIS)

    Panayotov, D.; Sardain, P.; Boccaccini, L.V.; Salavy, J.-F.; Cismondi, F.; Jourd'Heuil, L.

    2011-01-01

    The complexity of the Test Blanket Systems demands diverse and comprehensive integration activities. Test Blanket Modules - Consortia of Associates (TBM-CA) applies the system engineering methods in all stages of the Test Blanket System (TBS) design integration. Completed so far integration engineering tasks cover among others status and initial set of TBS operating parameters; list of codes, standards and regulations related to TBS; planning of the TBS interfaces and baseline documentation. Most of the attention is devoted to the establishment the Helium-Cooled Lithium Lead (HCLL) and Helium-Cooled Pebble Bed Lead (HCPB) TBS configuration baseline, TBS break down into sub-systems, identification, definition and management of the internal and external interfaces, development of the TBS plant break down structure (PBS), establishment and management of the required TBS baseline documentation infrastructure. Break down of the TBS into sub-systems that is crucial for the further design and interfaces' management has been selected considering several options and using specific evaluation criteria. Process of the TBS interfaces management covers the planning, definition and description, verification and review, non-conformances and deviations, and modification and improvement processes. Process of interfaces review is developed, identifying the actors, input, activities and output of the review. Finally the relations and interactions of system engineering processes with TBM configuration management and TBM-CA Quality Management System are discussed.

  13. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  14. Strengthening of Indonesia school of management in the 21st century through the implementation of school management system based information technology and communications integrated

    Science.gov (United States)

    Setiawan, Wawan; Munir, Senen, Syamsul Hadi; Nugroho, Eddy Prasetyo; Wihardi, Yaya; Nugraha, Eki

    2017-05-01

    Indonesia strengthening school management through the implementation of School Management System Based Information Technology and Communications (SMS-ICT) is intended to improve the performance of schools to accommodate the complexities of management in a computerized system that is simple but comprehensive so that it aligns with the era of the 21st century. School Management System Based Information and Communication Technology-based standards developed 12 education, adapted from 8 national standards into the system components that support the characteristics of 21st century schools. Twelfth system components include curriculum, Personal Development, Recruitment of New Student Services and Student Development, Education Labor and Education, Infrastructure, Leadership, School Management, Financing, Evaluation, and Social Communications. Development of the system is done through the stages of systematically covering Need Assessment, System Design, System Development, Testing Limited, Reveiw and Improvement, Testing Expanded, Finalize, and Packaging. SMS-ICT has gained Copyright and had seminars both nationally and internationally, and have been published by national journals, and in a book chapter. SMS-ICT applied to several schools in districy/city of West Java is based on cooperation with the Education Department of West Java. Implementation of School Management System as strengthening school management Indonesia shows the essential matters of school management. SMS-ICT managed to bring changes not only bring substantial improvements to the school how it should be managed, but also change the mindset of school leaders and teachers in ways of thinking and acting more professional in carrying out their respective duties. SMS-ICT managed as a unified system of governance that is integrated schools overall strategic component in an integrated system that implements ICT that has the capacity to process data and information quickly, accurately and reliably. SMS-ICT as a

  15. A Framework for Integration of IVHM Technologies for Intelligent Integration for Vehicle Management

    Science.gov (United States)

    Paris, Deidre E.; Trevino, Luis; Watson, Mike

    2005-01-01

    As a part of the overall goal of developing Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, the NASA Faculty Fellowship Program (NFFP) at Marshall Space Flight Center has performed a pilot study on IVHM principals which integrates researched IVHM technologies in support of Integrated Intelligent Vehicle Management (IIVM). IVHM is the process of assessing, preserving, and restoring system functionality across flight and ground systems (NASA NGLT 2004). The framework presented in this paper integrates advanced computational techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of IIVM. These real-time responses allow the IIVM to modify the effected vehicle subsystem(s) prior to a catastrophic event. Furthermore, the objective of this pilot program is to develop and integrate technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear the IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition, to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission

  16. Integrated systems innovations and applications

    CERN Document Server

    2015-01-01

    This book presents the results of discussions and presentation from the latest ISDT event (2014) which was dedicated to the 94th birthday anniversary of Prof. Lotfi A. Zade, father of Fuzzy logic. The book consists of three main chapters, namely: Chapter 1: Integrated Systems Design Chapter 2: Knowledge, Competence and Business Process Management Chapter 3: Integrated Systems Technologies Each article presents novel and scientific research results with respect to the target goal of improving our common understanding of KT integration.

  17. Integration of financial and management accounting systems : the mediating influence of a consistent financial language on controllership effectiveness

    OpenAIRE

    Weißenberger, Barbara E.; Angelkort, Hendrik

    2009-01-01

    To provide accounting information for management control purposes, two fundamental options exist: (a) The financial records can be used as a database for management accounting (integrated accounting system design), or (b) the management accounting system used by controllers can be based upon a so-called third set of books besides the financial and tax accounting records. Whereas the latter approach had been typical for firms in German-speaking countries until the 1980s, since then an increasi...

  18. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  19. Cancer Care Ontario and integrated cancer programs: portrait of a performance management system and lessons learned.

    Science.gov (United States)

    Cheng, Siu Mee; Thompson, Leslee J

    2006-01-01

    A performance management system has been implemented by Cancer Care Ontario (CCO). This system allows for the monitoring and management of 11 integrated cancer programs (ICPs) across the Province of Ontario. The system comprises of four elements: reporting frequency, reporting requirements, review meetings and accountability and continuous improvement activities. CCO and the ICPs have recently completed quarterly performance review exercises for the last two quarters of the fiscal year 2004-2005. The purpose of this paper is to address some of the key lessons learned. The paper provides an outline of the CCO performance management system. These lessons included: data must be valid and reliable; performance management requires commitments from both parties in the performance review exercises; streamlining performance reporting is beneficial; technology infrastructure which allows for cohesive management of data is vital for a sustainable performance management system; performance indicators need to stand up to scrutiny by both parties; and providing comparative data across the province is valuable. Critical success factors which would help to ensure a successful performance management system include: corporate engagement from various parts of an organization in the review exercises; desire to focus on performance improvement and avoidance of blaming; and strong data management systems. The performance management system is a practical and sustainable system that allows for performance improvement of cancer care services. It can be a vital tool to enhance accountability within the health care system. The paper demonstrates that the performance management system supports accountability in the cancer care system for Ontario, and reflects the principles of the provincial governments commitment to continuous improvement of healthcare.

  20. [Role and integration of technical prevention figures in the management system].

    Science.gov (United States)

    Bartolucci, G B; Santantonio, P; Casciani, M; Dagazzini, I

    2010-01-01

    The multifarious issues of health and safety at work require multi-disciplinary skills, both in the risk assessment and in the subsequent definition and management of preventive measures, and this requires a renewed operational protocol that supports integration and co-operation between the technical prevention figures. Thus, between occupational physicians and technical advisers there should be a concrete and fruitful interaction, which should not be episodic or occasional, but a modus operandi systematic and constant. In this contribution is discussed as the technical prevention figures should be included in the Health and Safety Management System and should make a specific contribution in defining corporate policies on prevention. In particular it is outlined the role that the occupational physician may play in the development of prevention and health promotion activities within the strategies of corporate social responsibility.

  1. Human Systems Integration in Practice: Constellation Lessons Learned

    Science.gov (United States)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  2. ASPECTS OF INTEGRATION MANAGEMENT METHODS

    Directory of Open Access Journals (Sweden)

    Artemy Varshapetian

    2015-10-01

    Full Text Available For manufacturing companies to succeed in today's unstable economic environment, it is necessary to restructure the main components of its activities: designing innovative product, production using modern reconfigurable manufacturing systems, a business model that takes into account the global strategy and management methods using modern management models and tools. The first three components are discussed in numerous publications, for example, (Koren, 2010 and is therefore not considered in the article. A large number of publications devoted to the methods and tools of production management, for example (Halevi, 2007. On the basis of what was said in the article discusses the possibility of the integration of only three methods have received in recent years, the most widely used, namely: Six Sigma method - SS (George et al., 2005 and supplements its-Design for six sigm? - DFSS (Taguchi, 2003; Lean production transformed with the development to the "Lean management" and further to the "Lean thinking" - Lean (Hirano et al., 2006; Theory of Constraints, developed E.Goldratt - TOC (Dettmer, 2001. The article investigates some aspects of this integration: applications in diverse fields, positive features, changes in management structure, etc.

  3. Performance assessment of human resource by integration of HSE and ergonomics and EFQM management system.

    Science.gov (United States)

    Sadegh Amalnick, Mohsen; Zarrin, Mansour

    2017-03-13

    Purpose The purpose of this paper is to present an integrated framework for performance evaluation and analysis of human resource (HR) with respect to the factors of health, safety, environment and ergonomics (HSEE) management system, and also the criteria of European federation for quality management (EFQM) as one of the well-known business excellence models. Design/methodology/approach In this study, an intelligent algorithm based on adaptive neuro-fuzzy inference system (ANFIS) along with fuzzy data envelopment analysis (FDEA) are developed and employed to assess the performance of the company. Furthermore, the impact of the factors on the company's performance as well as their strengths and weaknesses are identified by conducting a sensitivity analysis on the results. Similarly, a design of experiment is performed to prioritize the factors in the order of importance. Findings The results show that EFQM model has a far greater impact upon the company's performance than HSEE management system. According to the obtained results, it can be argued that integration of HSEE and EFQM leads to the performance improvement in the company. Practical implications In current study, the required data for executing the proposed framework are collected via valid questionnaires which are filled in by the staff of an aviation industry located in Tehran, Iran. Originality/value Managing HR performance results in improving usability, maintainability and reliability and finally in a significant reduction in the commercial aviation accident rate. Also, study of factors affecting HR performance authorities participate in developing systems in order to help operators better manage human error. This paper for the first time presents an intelligent framework based on ANFIS, FDEA and statistical tests for HR performance assessment and analysis with the ability of handling uncertainty and vagueness existing in real world environment.

  4. ISO 9001 and ISO 14001: An Integrated Quality Management System for an MTR Facility SAFARI-1 Research Reactor

    International Nuclear Information System (INIS)

    Du Bruyn, J.F.; Piani, C.S.B.

    2005-01-01

    The SAFARI-1 research reactor, owned and operated by the South African Nuclear Energy Corporation (Necsa), initially obtained ISO 9001 accreditation of its Quality, Health, Safety and Environmental (QHSE) management system via international affiliation from the South African Bureau of Standards (SABS) during 1998 and re-certification according to ISO 9001 (2000) in 2003. With ever-increasing demands on nuclear facilities to demonstrate conformance to environmental policies, SAFARI-1 has now developed an Environmental Management System (EMS) that is compliant with ISO 14001 (1996) and is fully integrated with the SAFARI-1 Quality Management System (QMS). The dynamic involvement of SAFARI-1 in commercial applications demanded that any transition of the original QMS to a fully incorporated QHSE system had to be done in a way that would ensure sustained delivery of a safe and reliable service with continuous quality. At the same time, the primary vision of operating a facility under an efficient financial management programme was essential. The criteria established by the original ISO 9001 compliant QMS were appraised against the additional requirements of ISO 14001 and a suitable superstructure derived for generation and implementation of an inclusive EMS. The transitional integration of this system was planned so as to produce a QMS suitable to quality, environmental and other management related issues for application to the unique function of a nuclear research reactor. (author)

  5. Agro-environmental evaluation of vineyard management using organic farming and integrated plant production systems

    OpenAIRE

    FORGET, D.; LACOMBE, J.; DURAND, A.

    2009-01-01

    Organic farming is often considered to be the most environmentally-friendly crop management system, even if integrated production also aims at decreasing the impact of agriculture on the natural environment. In order to establish references for the agro-environmental evaluation of these two production systems in relation to grape growing, INRA carried out an initial study from 2001 to 2004 at the plot scale. This study focused on two grape varieties (Merlot N and Cabernet Sauvignon) in its Co...

  6. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  7. Effective integration of environmental leadership and environmental management systems within Cameco's Mining Division

    Energy Technology Data Exchange (ETDEWEB)

    Nagy, K.; Borchardt, S., E-mail: kevin_nagy@cameco.com [Cameco Corp., Saskatoon, SK (Canada)

    2010-07-01

    To support the implementation of its integrated Safety, Health, Environment & Quality (SHEQ) Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducing environmental impacts in five key areas: air emissions, treated water quality and quantity, energy use and greenhouse gas emissions, and waste generation. To ensure environmental leadership becomes routine business practice, it was necessary to integrate the initiative into Cameco's programs and management systems at the corporate and operational levels. Operations-based environmental leadership strategies and action plans have since been developed, as well as a corporate reporting system to monitor Cameco's environmental performance. (author)

  8. Integrated inventory information system

    Digital Repository Service at National Institute of Oceanography (India)

    Sarupria, J.S.; Kunte, P.D.

    The nature of oceanographic data and the management of inventory level information are described in Integrated Inventory Information System (IIIS). It is shown how a ROSCOPO (report on observations/samples collected during oceanographic programme...

  9. The Effect of Information Security Management on Organizational Processes Integration in Supply Chain

    OpenAIRE

    Mohsen Shafiei Nikabadi; Ahmad Jafarian; Azam Jalili Bolhasani

    2012-01-01

    : The major purpose of this article was that how information security management has effect on supply chain integration and the effect of implementing "information security management system" on enhancing supplies chain integration. In this respect, current research was seeking a combination overview to these tow approaches (Information Security Management and Organizational Processes Integration by Enterprise Resources Planning System) and after that determined factors of these two import...

  10. TILLAGE AND DYNAMICS OF INORGANIC NITROGEN IN ECOLOGICAL AND INTEGRATION MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    J SMATANA

    2002-05-01

    Full Text Available During the period of 1991-1993 in the field experiment, the effect of different soil management (tillage 0,24 m and tillage 0,12-0,15 m in ecological and integration management system on changes of inorganic nitrogen (Nan = N-NH4 + + N-NO3 - content in the soil layer from 0 up to 0,6 m of the soil depth (0,00-0,30 m and 0,30- 0,60 m were studied. Trials were held in a warm climatic zone of the South – Western Slovakia on the brown soil. Different soil management systems (tillage 0,24 m and tillage 0,12-0,15 m considerably did not affected ammonification and nitrification processes in the soil. The sustainability of minimalization via shallow ploughing is not excluded, on the contrary this minimalization may have high a positive influence on economic saving the energy, labour costs, etc. The quantitative and qualitative changes of studied form of N were significantly effected by weather and soil depth. Soil content of N-NH4 + and N-NO3 - was in negative correlation with soil depth.

  11. Improve data integration performance by employing metadata management utility

    Energy Technology Data Exchange (ETDEWEB)

    Wei, M.; Sung, A.H. [New Mexico Petroleum Recovery Research Center, Socorro, NM (United States)

    2005-07-01

    This conference paper explored ways of integrating petroleum and exploration data obtained from different sources in order to provide more comprehensive data for various analysis purposes and to improve the integrity and consistency of integrated data. This paper proposes a methodology to enhance oil and gas industry data integration performance by cooperating data management utilities in Microsoft SQL Server database management system (DBMS) for small scale data integration without support of commercial software. By semi-automatically capturing metadata, data sources are investigated in detail, data quality problems are partially cleansed, and the performance of data integration is improved. 20 refs., 7 tabs., 1 fig.

  12. Integrating the nursing management minimum data set into the logical observation identifier names and codes system.

    Science.gov (United States)

    Subramanian, Amarnath; Westra, Bonnie; Matney, Susan; Wilson, Patricia S; Delaney, Connie W; Huff, Stan; Huff, Stanley M; Huber, Diane

    2008-11-06

    This poster describes the process used to integrate the Nursing Management Minimum Data Set (NMMDS), an instrument to measure the nursing context of care, into the Logical Observation Identifier Names and Codes (LOINC) system to facilitate contextualization of quality measures. Integration of the first three of 18 elements resulted in 48 new codes including five panels. The LOINC Clinical Committee has approved the presented mapping for their next release.

  13. An integrated management systems approach to corporate social responsibility.

    NARCIS (Netherlands)

    Asif, M.; Searcy, C.; Zutshi, A.; Fisscher, O.A.M.

    2011-01-01

    A great deal of research has emphasized the strategic management of corporate social responsibility (CSR). However, gaps remain on how CSR can be effectively integrated with existing business processes. One key question remaining is how to design business processes so that they accommodate

  14. Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John L.; Morris, Jonathan A.; Turowski, Mark P.; Franzl, Richard

    2010-01-01

    This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

  15. The Effect of Information Security Management on Organizational Processes Integration in Supply Chain

    Directory of Open Access Journals (Sweden)

    Mohsen Shafiei Nikabadi

    2012-03-01

    Full Text Available : The major purpose of this article was that how information security management has effect on supply chain integration and the effect of implementing "information security management system" on enhancing supplies chain integration. In this respect, current research was seeking a combination overview to these tow approaches (Information Security Management and Organizational Processes Integration by Enterprise Resources Planning System and after that determined factors of these two important issue by factor analysis. Researchers using a series of comments in the automotive experts (production planning and management and supply chain experts and caregivers car makers and suppliers in the first level and second level supply chain industry. In this way, it has been done that impact on how information security management processes enterprise supply chain integration with the help of statistical correlation analysis. The results of this investigation indicated effect of "information security management system" various dimensions that were coordination of information, prevent human errors and hardware, the accuracy of information and education for users on two dimensions of internal and external integration of business processes, supply chain and finally, it can increased integration of business processes in supply chain. At the end owing to quite these results, deployment of "information security management system" increased the integration of organizational processes in supply chain. It could be demonstrate with the consideration of relation of organizational integration processes whit the level of coordination of information, prevent errors and accuracy of information throughout the supply chain.

  16. Outcome mapping for health system integration

    Directory of Open Access Journals (Sweden)

    Tsasis P

    2013-03-01

    Full Text Available Peter Tsasis,1 Jenna M Evans,2 David Forrest,3 Richard Keith Jones4 1School of Health Policy and Management, Faculty of Health, York University, Toronto, Canada; 2Institute of Health Policy, Management and Evaluation, Faculty of Medicine, University of Toronto, Canada; 3Global Vision Consulting Ltd, Victoria, Canada; 4R Keith Jones and Associates, Victoria, Canada Abstract: Health systems around the world are implementing integrated care strategies to improve quality, reduce or maintain costs, and improve the patient experience. Yet few practical tools exist to aid leaders and managers in building the prerequisites to integrated care, namely a shared vision, clear roles and responsibilities, and a common understanding of how the vision will be realized. Outcome mapping may facilitate stakeholder alignment on the vision, roles, and processes of integrated care delivery via participative and focused dialogue among diverse stakeholders on desired outcomes and enabling actions. In this paper, we describe an outcome-mapping exercise we conducted at a Local Health Integration Network in Ontario, Canada, using consensus development conferences. Our preliminary findings suggest that outcome mapping may help stakeholders make sense of a complex system and foster collaborative capital, a resource that can support information sharing, trust, and coordinated change toward integration across organizational and professional boundaries. Drawing from the theoretical perspectives of complex adaptive systems and collaborative capital, we also outline recommendations for future outcome-mapping exercises. In particular, we emphasize the potential for outcome mapping to be used as a tool not only for identifying and linking strategic outcomes and actions, but also for studying the boundaries, gaps, and ties that characterize social networks across the continuum of care. Keywords: integrated care, integrated delivery systems, complex adaptive systems, social capital

  17. Heat management in integrated circuits on-chip and system-level monitoring and cooling

    CERN Document Server

    Ogrenci-Memik, Seda

    2016-01-01

    This essential overview covers the subject of thermal monitoring and management in integrated circuits. Specifically, it focuses on devices and materials that are intimately integrated on-chip (as opposed to in-package or on-board) for the purposes of thermal monitoring and thermal management.

  18. Integration and transformation of rural service delivery: The role of management information and decision support systems

    CSIR Research Space (South Africa)

    Mashiri, M

    2005-01-01

    Full Text Available The paper deals with two main themes: 1) the integration and transformation of rural service delivery; and 2) role of management information and decision support systems in this process. Referring specifically to the types of rural areas, conditions...

  19. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  20. Sophistication and integration of plant engineering CAD-CAE systems

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Hanyu, Masaharu; Ota, Yoshimi; Kobayashi, Yasuhiro.

    1995-01-01

    In respective departments in charge of basic planning, design, manufacture, inspection and construction of nuclear power plants, by the positive utilization of CAD/CAE system, efficient workings have been advanced. This time, the plant integrated CAE system wich heightens the function of these individual systems, and can make workings efficient and advanced by unifying and integrating them was developed. This system is composed of the newly developed application system and the data base system which enables the unified management of engineering data and high speed data conversion in addition to the CAD system for three-dimensional plant layout planning. On the basis of the rich experience and the proposal of improvement of designers by the application of the CAD system for three-dimensional plant layout planning to actual machines, the automation, speed increase and the visualization of input and output by graphical user interface (GUI) in the processing of respective applications were made feasible. As the advancement of plant CAE system, scenic engineering system, integrated layout CAE system, electric instrumentation design CAE system and construction planning CAE system are described. As for the integration of plant CAE systems, the integrated engineering data base, the combination of plant CAE systems, and the operation management in the dispersed environment of networks are reported. At present, Hitachi Ltd. exerts efforts for the construction of atomic energy product in formation integrated management system as the second stage of integration. (K.I.)

  1. Development of an integrated medical supply information system

    Science.gov (United States)

    Xu, Eric; Wermus, Marek; Blythe Bauman, Deborah

    2011-08-01

    The integrated medical supply inventory control system introduced in this study is a hybrid system that is shaped by the nature of medical supply, usage and storage capacity limitations of health care facilities. The system links demand, service provided at the clinic, health care service provider's information, inventory storage data and decision support tools into an integrated information system. ABC analysis method, economic order quantity model, two-bin method and safety stock concept are applied as decision support models to tackle inventory management issues at health care facilities. In the decision support module, each medical item and storage location has been scrutinised to determine the best-fit inventory control policy. The pilot case study demonstrates that the integrated medical supply information system holds several advantages for inventory managers, since it entails benefits of deploying enterprise information systems to manage medical supply and better patient services.

  2. Impact of Conventional and Integrated Management Systems on the Water-Soluble Vitamin Content in Potatoes, Field Beans, and Cereals.

    Science.gov (United States)

    Freitag, Sabine; Verrall, Susan R; Pont, Simon D A; McRae, Diane; Sungurtas, Julia A; Palau, Raphaëlle; Hawes, Cathy; Alexander, Colin J; Allwood, J William; Foito, Alexandre; Stewart, Derek; Shepherd, Louise V T

    2018-01-31

    The reduction of the environmental footprint of crop production without compromising crop yield and their nutritional value is a key goal for improving the sustainability of agriculture. In 2009, the Balruddery Farm Platform was established at The James Hutton Institute as a long-term experimental platform for cross-disciplinary research of crops using two agricultural ecosystems. Crops representative of UK agriculture were grown under conventional and integrated management systems and analyzed for their water-soluble vitamin content. Integrated management, when compared with the conventional system, had only minor effects on water-soluble vitamin content, where significantly higher differences were seen for the conventional management practice on the levels of thiamine in field beans (p water-soluble vitamin content of the crops analyzed here.

  3. IVHM Framework for Intelligent Integration for Vehicle Health Management

    Science.gov (United States)

    Paris, Deidre; Trevino, Luis C.; Watson, Michael D.

    2005-01-01

    Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, is the process of assessing, preserving, and restoring system functionality across flight and techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of Integrated Intelligent Vehicle Management (IIVM). These real-time responses allow the IIVM to modify the affected vehicle subsystem(s) prior to a catastrophic event. Furthermore, this framework integrates technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear that IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission objectives. These systems include the following: Guidance and Navigation; Communications and Tracking; Vehicle Monitoring; Information Transport and Integration; Vehicle Diagnostics; Vehicle Prognostics; Vehicle Mission Planning, Automated Repair and Replacement; Vehicle Control; Human Computer Interface; and Onboard Verification and Validation. Furthermore, the presented

  4. [Research and development of medical case database: a novel medical case information system integrating with biospecimen management].

    Science.gov (United States)

    Pan, Shiyang; Mu, Yuan; Wang, Hong; Wang, Tong; Huang, Peijun; Ma, Jianfeng; Jiang, Li; Zhang, Jie; Gu, Bing; Yi, Lujiang

    2010-04-01

    To meet the needs of management of medical case information and biospecimen simultaneously, we developed a novel medical case information system integrating with biospecimen management. The database established by MS SQL Server 2000 covered, basic information, clinical diagnosis, imaging diagnosis, pathological diagnosis and clinical treatment of patient; physicochemical property, inventory management and laboratory analysis of biospecimen; users log and data maintenance. The client application developed by Visual C++ 6.0 was used to implement medical case and biospecimen management, which was based on Client/Server model. This system can perform input, browse, inquest, summary of case and related biospecimen information, and can automatically synthesize case-records based on the database. Management of not only a long-term follow-up on individual, but also of grouped cases organized according to the aim of research can be achieved by the system. This system can improve the efficiency and quality of clinical researches while biospecimens are used coordinately. It realizes synthesized and dynamic management of medical case and biospecimen, which may be considered as a new management platform.

  5. Integrating research tools to support the management of social-ecological systems under climate change

    Science.gov (United States)

    Miller, Brian W.; Morisette, Jeffrey T.

    2014-01-01

    Developing resource management strategies in the face of climate change is complicated by the considerable uncertainty associated with projections of climate and its impacts and by the complex interactions between social and ecological variables. The broad, interconnected nature of this challenge has resulted in calls for analytical frameworks that integrate research tools and can support natural resource management decision making in the face of uncertainty and complex interactions. We respond to this call by first reviewing three methods that have proven useful for climate change research, but whose application and development have been largely isolated: species distribution modeling, scenario planning, and simulation modeling. Species distribution models provide data-driven estimates of the future distributions of species of interest, but they face several limitations and their output alone is not sufficient to guide complex decisions for how best to manage resources given social and economic considerations along with dynamic and uncertain future conditions. Researchers and managers are increasingly exploring potential futures of social-ecological systems through scenario planning, but this process often lacks quantitative response modeling and validation procedures. Simulation models are well placed to provide added rigor to scenario planning because of their ability to reproduce complex system dynamics, but the scenarios and management options explored in simulations are often not developed by stakeholders, and there is not a clear consensus on how to include climate model outputs. We see these strengths and weaknesses as complementarities and offer an analytical framework for integrating these three tools. We then describe the ways in which this framework can help shift climate change research from useful to usable.

  6. INTEGRATED DOCUMENT MANAGEMENT SOLUTION FOR THE LOCAL GOVERNMENT

    Directory of Open Access Journals (Sweden)

    Nistor Razvan

    2013-07-01

    Full Text Available In this paper we present system analysis and design elements for the integrated document management solution at local governing authorities in the rural areas. While specifically dealing with the actual management of the Agricultural Register, an important primary unitary evidence document, we also keep a general character of the discussion, in order to argue for the generality of the proposed solution. Hence, for the identified and described problem space we propose an administrative and software infrastructure solution. This work is an empirical research in which our aim is primarily to identify key problems within the local governing authorities from several perspectives concerning the management of the Agricultural Register then to address those problems with an integrated document management system. For the proposed solution we give and argue the general system architecture and describe the key-mechanisms that support quality requirements. The relevance of this research concern is given by the impact of the actual Agricultural Register management on important stakeholders. This can be measured as the satisfaction felt by taxpayers and the performance of the local governing authorities, the Financial Administration, the Agency of Payments and Intervention in Agriculture and the Ministry of Agriculture and Rural Development. This work is also intended as a start-point for a new, modern thinking of the governing authorities in their pursue to improve public services. For this, in our work we highlight the importance of complete system analysis at all administrative levels as a main priority concern for all public managers. Our aim is the improvement of the public service by rising the awareness of the decision makers on the necessity of using integrated document management solutions for the provided services. Also, our work aims at increasing the efficiency with which nowadays, governing authorities invest public funds in various IT projects

  7. Proposal for implementation risk management according ABNT NBR ISO 31000 standard applied to internal audit process of Integrated Management System of IPEN

    International Nuclear Information System (INIS)

    Scapin Junior, Wilson S.; Salvetti, Tereza C.; Longo, Guilherme C.

    2015-01-01

    The paper objective is to establish a risk management methodology applied to internal audits processes of IPEN Integrated Management System (IMS). In continuous seeking of updating methodologies to assist effective management based on the constant changes in the organizational world, and the development of management tools used for decision making, risk management demonstrates trends to be a new tool with high efficiency. This trend is accentuated by the fact that risk management is being incorporated into the new revision of quality management standard ISO 9001, estimated conclusion in November 2015. The identification, evaluation and treatment of risks are present in eleven items of its ten requirements at new revision. From the conclusion of the review, all organizations certified by that standard should make the necessary changes in their systems to meet the new requirements. This proposal will provide anticipate the changes that will occur in the management system of IPEN in accordance with this new revision. With the character of a pilot program to implement the organizational culture change in relationship to new concepts related to risks and implementation of risk management all other system processes that will be affected by the new revision of this standard. The methodology used for this paper is supported by the standards ABNT NBR ISO 31000. (author)

  8. Proposal for implementation risk management according ABNT NBR ISO 31000 standard applied to internal audit process of Integrated Management System of IPEN

    Energy Technology Data Exchange (ETDEWEB)

    Scapin Junior, Wilson S.; Salvetti, Tereza C.; Longo, Guilherme C., E-mail: wsscapin@ipen.br, E-mail: salvetti@ipen.br, E-mail: glongo@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The paper objective is to establish a risk management methodology applied to internal audits processes of IPEN Integrated Management System (IMS). In continuous seeking of updating methodologies to assist effective management based on the constant changes in the organizational world, and the development of management tools used for decision making, risk management demonstrates trends to be a new tool with high efficiency. This trend is accentuated by the fact that risk management is being incorporated into the new revision of quality management standard ISO 9001, estimated conclusion in November 2015. The identification, evaluation and treatment of risks are present in eleven items of its ten requirements at new revision. From the conclusion of the review, all organizations certified by that standard should make the necessary changes in their systems to meet the new requirements. This proposal will provide anticipate the changes that will occur in the management system of IPEN in accordance with this new revision. With the character of a pilot program to implement the organizational culture change in relationship to new concepts related to risks and implementation of risk management all other system processes that will be affected by the new revision of this standard. The methodology used for this paper is supported by the standards ABNT NBR ISO 31000. (author)

  9. A SURVEY ON INDIAN EXPERIENCE ON INTEGRATED MANAGEMENT STANDARDS (IMS

    Directory of Open Access Journals (Sweden)

    H. Khanna

    2009-09-01

    Full Text Available Adoption of management systems standards is a key issue in manufacturing industry in India. Following the global trend quality and environmental issues are gaining importance. However the number of ISO 14001 certified companies are much less in India as compared to ISO 9001. The integration of ISO 14001 with ISO 9001 may help companies to sustain competitive advantage and overcome disappointments with quality standards and in turn encourage companies to adopt good environmental practices. The aim of this research is to study the implementation of integrated management standards (IMS by the manufacturing organizations in India. The different aspects of integration and benefits of IMS implementation are analyzed. This r esearch is based on empirical study carried out in Indian manufacturing firms, involving the application of a questionnaire. This questionnaire was tested on 50 manufacturing companies in India. The study reveals that focus on stakeholders; top management commitment and training are critical success factors for implementation of IMS. The main benefits of integration are discussed. The small sample size is one of the major limitations of this study. The paper informs the managers in manufacturing organizations and practitioners of management system standards especially in developing countries about IMS and will enable them to adopt IMS in future so that those organizations may not implement multiple and overlapping MSS(Management System Standards.

  10. Smart systems integration and simulation

    CERN Document Server

    Poncino, Massimo; Pravadelli, Graziano

    2016-01-01

    This book-presents new methods and tools for the integration and simulation of smart devices. The design approach described in this book explicitly accounts for integration of Smart Systems components and subsystems as a specific constraint. It includes methodologies and EDA tools to enable multi-disciplinary and multi-scale modeling and design, simulation of multi-domain systems, subsystems and components at all levels of abstraction, system integration and exploration for optimization of functional and non-functional metrics. By covering theoretical and practical aspects of smart device design, this book targets people who are working and studying on hardware/software modelling, component integration and simulation under different positions (system integrators, designers, developers, researchers, teachers, students etc.). In particular, it is a good introduction to people who have interest in managing heterogeneous components in an efficient and effective way on different domains and different abstraction l...

  11. The computational design of Geological Disposal Technology Integration System

    International Nuclear Information System (INIS)

    Ishihara, Yoshinao; Iwamoto, Hiroshi; Kobayashi, Shigeki; Neyama, Atsushi; Endo, Shuji; Shindo, Tomonori

    2002-03-01

    In order to develop 'Geological Disposal Technology Integration System' that is intended to systematize as knowledge base for fundamental study, the computational design of an indispensable database and image processing function to 'Geological Disposal Technology Integration System' was done, the prototype was made for trial purposes, and the function was confirmed. (1) Database of Integration System which systematized necessary information and relating information as an examination of a whole of repository composition and managed were constructed, and the system function was constructed as a system composed of image processing, analytical information management, the repository component management, and the system security function. (2) The range of the data treated with this system and information was examined, the design examination of the database structure was done, and the design examination of the image processing function of the data preserved in an integrated database was done. (3) The prototype of the database concerning a basic function, the system operation interface, and the image processing function was manufactured to verify the feasibility of the 'Geological Disposal Technology Integration System' based on the result of the design examination and the function was confirmed. (author)

  12. Integrated online energy and battery life management for hybrid long haulage truck

    NARCIS (Netherlands)

    Pham, H.T.; Kessels, J.T.B.A.; Bosch, van den P.P.J.; Huisman, R.G.M.

    2014-01-01

    Battery lifetime management plays an important role for successful commercializing hybrid electric vehicles. This paper aims at integrating the battery lifetime management into the energy management system of a heavy-duty hybrid electric truck. The developed strategy called Integrated Energy

  13. Pipeline integrity management: integration of geotechnical and mechanical assessment to control potential risks due to external forces

    Energy Technology Data Exchange (ETDEWEB)

    Malpartida Moya, John E.; Sota, Giancarlo Massucco de la; Seri, Walter [Compania Operadora de Gas del Amazonas, Lima (Peru)

    2009-07-01

    Every pipeline integrity management system evaluates and controls various threats. On pipelines which have particular characteristics as it is the case of the Andean pipelines and pipelines crossing jungles, one of the main threats are the external forces. Even, this threat causes a greater number of failures than other threats like corrosion or the third part damage. Facing this situation, the pipeline integrity management system of TgP has achieved an important development in the use and suitable handling of the information provided by diverse techniques of pipeline mechanical inspection and geotechnical inspection of the right-of-way (ROW). This document presents our methodology, which interrelate information of the in-line inspection, information of geotechnical inspections of the ROW, instrumentation (Strain Gages), topographic monitoring, among others. All this information is supported in a Geographic Information System (GIS) which allows us to integrate the information. By means of the pipeline integrity management system we control potential risks due to external forces, we have been able to act before events become critical, with no occurrence of failures. This system allows us simultaneously to optimize efforts and preserve the mechanical integrity of our pipelines, not producing neither personal nor environmental nor economical affectation. (author)

  14. Functional Analysis for an Integrated Capability of Arrival/Departure/Surface Management with Tactical Runway Management

    Science.gov (United States)

    Phojanamongkolkij, Nipa; Okuniek, Nikolai; Lohr, Gary W.; Schaper, Meilin; Christoffels, Lothar; Latorella, Kara A.

    2014-01-01

    The runway is a critical resource of any air transport system. It is used for arrivals, departures, and for taxiing aircraft and is universally acknowledged as a constraining factor to capacity for both surface and airspace operations. It follows that investigation of the effective use of runways, both in terms of selection and assignment as well as the timing and sequencing of the traffic is paramount to the efficient traffic flows. Both the German Aerospace Center (DLR) and NASA have developed concepts and tools to improve atomic aspects of coordinated arrival/departure/surface management operations and runway configuration management. In December 2012, NASA entered into a Collaborative Agreement with DLR. Four collaborative work areas were identified, one of which is called "Runway Management." As part of collaborative research in the "Runway Management" area, which is conducted with the DLR Institute of Flight Guidance, located in Braunschweig, the goal is to develop an integrated system comprised of the three DLR tools - arrival, departure, and surface management (collectively referred to as A/D/S-MAN) - and NASA's tactical runway configuration management (TRCM) tool. To achieve this goal, it is critical to prepare a concept of operations (ConOps) detailing how the NASA runway management and DLR arrival, departure, and surface management tools will function together to the benefit of each. To assist with the preparation of the ConOps, the integrated NASA and DLR tools are assessed through a functional analysis method described in this report. The report first provides the highlevel operational environments for air traffic management (ATM) in Germany and in the U.S., and the descriptions of the DLR's A/D/S-MAN and NASA's TRCM tools at the level of details necessary to compliment the purpose of the study. Functional analyses of each tool and a completed functional analysis of an integrated system design are presented next in the report. Future efforts to fully

  15. Dual-Use Aspects of System Health Management

    Science.gov (United States)

    Owens, P. R.; Jambor, B. J.; Eger, G. W.; Clark, W. A.

    1994-01-01

    System Health Management functionality is an essential part of any space launch system. Health management functionality is an integral part of mission reliability, since it is needed to verify the reliability before the mission starts. Health Management is also a key factor in life cycle cost reduction and in increasing system availability. The degree of coverage needed by the system and the degree of coverage made available at a reasonable cost are critical parameters of a successful design. These problems are not unique to the launch vehicle world. In particular, the Intelligent Vehicle Highway System, commercial aircraft systems, train systems, and many types of industrial production facilities require various degrees of system health management. In all of these applications, too, the designers must balance the benefits and costs of health management in order to optimize costs. The importance of an integrated system is emphasized. That is, we present the case for considering health management as an integral part of system design, rather than functionality to be added on at the end of the design process. The importance of maintaining the system viewpoint is discussed in making hardware and software tradeoffs and in arriving at design decisions. We describe an approach to determine the parameters to be monitored in any system health management application. This approach is based on Design of Experiments (DOE), prototyping, failure modes and effects analyses, cost modeling and discrete event simulation. The various computer-based tools that facilitate the approach are discussed. The approach described originally was used to develop a fault tolerant avionics architecture for launch vehicles that incorporated health management as an integral part of the system. Finally, we discuss generalizing the technique to apply it to other domains. Several illustrations are presented.

  16. A conceptual design for an integrated data base management system for remote sensing data. [user requirements and data processing

    Science.gov (United States)

    Maresca, P. A.; Lefler, R. M.

    1978-01-01

    The requirements of potential users were considered in the design of an integrated data base management system, developed to be independent of any specific computer or operating system, and to be used to support investigations in weather and climate. Ultimately, the system would expand to include data from the agriculture, hydrology, and related Earth resources disciplines. An overview of the system and its capabilities is presented. Aspects discussed cover the proposed interactive command language; the application program command language; storage and tabular data maintained by the regional data base management system; the handling of data files and the use of system standard formats; various control structures required to support the internal architecture of the system; and the actual system architecture with the various modules needed to implement the system. The concepts on which the relational data model is based; data integrity, consistency, and quality; and provisions for supporting concurrent access to data within the system are covered in the appendices.

  17. INTEGRATED INFORMATION SYSTEM ARCHITECTURE PROVIDING BEHAVIORAL FEATURE

    Directory of Open Access Journals (Sweden)

    Vladimir N. Shvedenko

    2016-11-01

    Full Text Available The paper deals with creation of integrated information system architecture capable of supporting management decisions using behavioral features. The paper considers the architecture of information decision support system for production system management. The behavioral feature is given to an information system, and it ensures extraction, processing of information, management decision-making with both automated and automatic modes of decision-making subsystem being permitted. Practical implementation of information system with behavior is based on service-oriented architecture: there is a set of independent services in the information system that provides data of its subsystems or data processing by separate application under the chosen variant of the problematic situation settlement. For creation of integrated information system with behavior we propose architecture including the following subsystems: data bus, subsystem for interaction with the integrated applications based on metadata, business process management subsystem, subsystem for the current state analysis of the enterprise and management decision-making, behavior training subsystem. For each problematic situation a separate logical layer service is created in Unified Service Bus handling problematic situations. This architecture reduces system information complexity due to the fact that with a constant amount of system elements the number of links decreases, since each layer provides communication center of responsibility for the resource with the services of corresponding applications. If a similar problematic situation occurs, its resolution is automatically removed from problem situation metamodel repository and business process metamodel of its settlement. In the business process performance commands are generated to the corresponding centers of responsibility to settle a problematic situation.

  18. Review of selected contributions of the conference 'Integrated quality management systems in completion of units 3 and 4 Mochovce'

    International Nuclear Information System (INIS)

    2009-04-01

    There were 14 contributions presented of the conference focused on the integrated quality management systems in completion EMO34. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999 at the completion of the Nuclear Power Plant Mochovce of units 3 and 4

  19. Economic value of biological control in integrated pest management of managed plant systems.

    Science.gov (United States)

    Naranjo, Steven E; Ellsworth, Peter C; Frisvold, George B

    2015-01-07

    Biological control is an underlying pillar of integrated pest management, yet little focus has been placed on assigning economic value to this key ecosystem service. Setting biological control on a firm economic foundation would help to broaden its utility and adoption for sustainable crop protection. Here we discuss approaches and methods available for valuation of biological control of arthropod pests by arthropod natural enemies and summarize economic evaluations in classical, augmentative, and conservation biological control. Emphasis is placed on valuation of conservation biological control, which has received little attention. We identify some of the challenges of and opportunities for applying economics to biological control to advance integrated pest management. Interaction among diverse scientists and stakeholders will be required to measure the direct and indirect costs and benefits of biological control that will allow farmers and others to internalize the benefits that incentivize and accelerate adoption for private and public good.

  20. STRATEGY OF DATA INTEGRITY CONTROL FOR SYSTEM WIDE INFORMATION MANAGEMENT CONCEPT

    Directory of Open Access Journals (Sweden)

    Lev E. Rudel'son

    2017-01-01

    Full Text Available The growth in demand for air transportation services is steadily ahead of the capacity of carriers. The most advanced aviation empires set a goal to triple the capacity of the current air traffic management system by the mid-twenties. The technical basis for such achievements is equipping all aircraft with automatic dependent surveillance broadcast systems, which provides both control over the parameters of their movement anywhere in the world, and reliable mutual exchange of verified information on the air picture and forecasts of its development between all pilots and ground services.The concepts of collaborative decision-making on air traffic flows management and System Wide Information Management, suggested by ICAO experts, have proclaimed the idea of the flight information availability as a means of increasing the intensity of flights, not only for considering, but also for making changes in it by all the participants of the process of organizing and servicing the flows – analysts, meteorologists, planners, air traffic controllers, pilots (in the part relating to their area. The technology of specialists’ cooperation is proposed. It allows to make sensible decisions on servicing aircraft flows for the whole depth of their flights (both on routes and along free trajectories when changing the conditions for performing flights.The task is to develop software procedures for computer support of new concepts that ensure the integrity of aeronautical data used by all the participants in the operational organization of flows. All the interconnected elements of air traffic management (personnel and equipment may distort the system public information with the known probability of cooperation outcomes. The article proposes a three-level algorithm for neutralizing data mismatch in the elements of a distributed network of process participants ground and on-board computing facilities, allowing in the actual time to maintain consistency of information

  1. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  2. Data Entities and Information System Matrix for Integrated Agriculture Information System (IAIS)

    Science.gov (United States)

    Budi Santoso, Halim; Delima, Rosa

    2018-03-01

    Integrated Agriculture Information System is a system that is developed to process data, information, and knowledge in Agriculture sector. Integrated Agriculture Information System brings valuable information for farmers: (1) Fertilizer price; (2) Agriculture technique and practise; (3) Pest management; (4) Cultivation; (5) Irrigation; (6) Post harvest processing; (7) Innovation in agriculture processing. Integrated Agriculture Information System contains 9 subsystems. To bring an integrated information to the user and stakeholder, it needs an integrated database approach. Thus, researchers describes data entity and its matrix relate to subsystem in Integrated Agriculture Information System (IAIS). As a result, there are 47 data entities as entities in single and integrated database.

  3. Integrated groundwater data management

    Science.gov (United States)

    Fitch, Peter; Brodaric, Boyan; Stenson, Matt; Booth, Nathaniel; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    The goal of a data manager is to ensure that data is safely stored, adequately described, discoverable and easily accessible. However, to keep pace with the evolution of groundwater studies in the last decade, the associated data and data management requirements have changed significantly. In particular, there is a growing recognition that management questions cannot be adequately answered by single discipline studies. This has led a push towards the paradigm of integrated modeling, where diverse parts of the hydrological cycle and its human connections are included. This chapter describes groundwater data management practices, and reviews the current state of the art with enterprise groundwater database management systems. It also includes discussion on commonly used data management models, detailing typical data management lifecycles. We discuss the growing use of web services and open standards such as GWML and WaterML2.0 to exchange groundwater information and knowledge, and the need for national data networks. We also discuss cross-jurisdictional interoperability issues, based on our experience sharing groundwater data across the US/Canadian border. Lastly, we present some future trends relating to groundwater data management.

  4. Integrating a mobile health setup in a chronic disease management network.

    Science.gov (United States)

    Ding, Hang; Ireland, Derek; Jayasena, Rajiv; Curmi, Jamie; Karunanithi, Mohan

    2013-01-01

    Supporting self management of chronic disease in collaboration with primary healthcare has been a national priority in order to mitigate the emerging disease burden on the already strained healthcare system. However, in practice, the uptake of self-management programs and compliance with clinical guidelines remain poor. Time constraints due to work commitments and lack of efficient monitoring tools have been the major barrier to the uptake and compliance. In this paper, we present a newly integrated mobile health system with a clinical chronic disease management network called cdmNet, which has already been validated to facilitate General Practitioners (GPs) to provide collaborative disease management services. The newly integrated solution takes advantage of the latest mobile web and wireless Bluetooth communication techniques to enable patients to record health data entries through ubiquitous mobile phones, and allows the data to be simultaneously shared by multidisciplinary care teams. This integration would enable patients to self-manage their chronic disease conditions in collaboration with GPs and hence, improve the uptake and compliance. Additionally, the proposed integration will provide a useful framework encouraging the translation of innovative mobile health technologies into highly regulated healthcare systems.

  5. Supporting Facility Management Processes through End-Users’ Integration and Coordinated BIM-GIS Technologies

    Directory of Open Access Journals (Sweden)

    Claudio Mirarchi

    2018-05-01

    Full Text Available The integration of facility management and building information modelling (BIM is an innovative and critical undertaking process to support facility maintenance and management. Even though recent research has proposed various methods and performed an increasing number of case studies, there are still issues of communication processes to be addressed. This paper presents a theoretical framework for digital systems integration of virtual models and smart technologies. Based on the comprehensive analysis of existing technologies for indoor localization, a new workflow is defined and designed, and it is utilized in a practical case study to test the model performance. In the new workflow, a facility management supporting platform is proposed and characterized, featuring indoor positioning systems to allow end users to send geo-referenced reports to central virtual models. In addition, system requirements, information technology (IT architecture and application procedures are presented. Results show that the integration of end users in the maintenance processes through smart and easy tools can overcome the existing limits of barcode systems and building management systems for failure localization. The proposed framework offers several advantages. First, it allows the identification of every element of an asset including wide physical building elements (walls, floors, etc. without requiring a prior mapping. Second, the entire cycle of maintenance activities is managed through a unique integrated system including the territorial dimension. Third, data are collected in a standard structure for future uses. Furthermore, the integration of the process in a centralized BIM-GIS (geographical information system information management system admit a scalable representation of the information supporting facility management processes in terms of assets and supply chain management and monitoring from a spatial perspective.

  6. Integral Management of Irrigation Water in Intensive Horticultural Systems of Almería

    OpenAIRE

    Pedro Garcia-Caparros; Juana Isabel Contreras; Rafael Baeza; Maria Luz Segura; Maria Teresa Lao

    2017-01-01

    The development of intensive horticulture in Almería, with a huge increase in greenhouse surface area, is related to three essential factors: climatic characteristics, groundwater use and mulching sandy soil. The purpose of the present paper is to draw a picture of the integral management of water irrigation in the intensive horticultural systems in the region, by identifying the most significant water resource contributions and alternative water resources. Results indicate that the use of gr...

  7. Integrated design for space transportation system

    CERN Document Server

    Suresh, B N

    2015-01-01

    The book addresses the overall integrated design aspects of a space transportation system involving several disciplines like propulsion, vehicle structures, aerodynamics, flight mechanics, navigation, guidance and control systems, stage auxiliary systems, thermal systems etc. and discusses the system approach for design, trade off analysis, system life cycle considerations, important aspects in mission management, the risk assessment, etc. There are several books authored to describe the design aspects of various areas, viz., propulsion, aerodynamics, structures, control, etc., but there is no book which presents space transportation system (STS) design in an integrated manner. This book attempts to fill this gap by addressing systems approach for STS design, highlighting the integrated design aspects, interactions between various subsystems and interdependencies. The main focus is towards the complex integrated design to arrive at an optimum, robust and cost effective space transportation system. The orbit...

  8. Integrated digital planning and management tools - the example of buildings; Integrierte digitale Planungs- und Management-Werkzeuge - am Beispiel von Gebaeuden

    Energy Technology Data Exchange (ETDEWEB)

    Gauchel, J. [WIBc, Objektorientierte Systeme fuer Gebaeudeplanung und -management, Karlsruhe (Germany)

    1995-12-31

    In chapter 4 of the anthology about building control integrated digital planning and management tools are described. Integrated planning and management tools are task-orientated data processing applications, which are integrated into a data management and a common user-interface. The following aspects are discussed: realistic modelling, CAD-systems, object-orientated system architecture as well as building management. (BWI) [Deutsch] Kapitel 4 des Sammelbandes ueber Building Control ist Integrierten digitalen Planungs- und Managementwerkzeugen gewindmet. Unter Integrierten Planungs- und Managementwerkzeugen werden dabei aufgabenorientierte EDV-Anwendungen verstanden, die in eine gemeinsame Datenverwaltung und ein gemeinsames Nutzer-Interface eingebunden sind. Folgende Themen werden angesprochen: Realistische Modellierung, CAD-Systeme, objektorientierte Systemarchitekturen sowie Gebaeudemanagement. (BWI)

  9. Transmission Congestion Management using a Wind Integrated Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    S. Gope

    2017-08-01

    Full Text Available Transmission congestion is a vital problem in the power system security and reliability sector. To ensure the stable operation of the system, a congestion free power network is desirable. In this paper, a new Congestion Management (CM technique, the Wind integrated Compressed Air Energy Storage (WCAES system is used to alleviate transmission congestion and to minimize congestion mitigation cost. The CM problem has been solved by using the Generator Sensitivity Factor (GSF and the Bus Sensitivity Factor (BSF. BSF is used for finding the optimal location of WCAES in the system. GSF with a Moth Flame Optimization (MFO algorithm is used for rescheduling the generators to alleviate congestion and to minimize congestion cost by improving security margin. The impact of the WCAES system is tested with a 39 bus system. To validate this approach, the same problem has been solved with a Particle Swarm Optimization (PSO algorithm and the obtained results are compared with the ones from the MFO algorithm.

  10. Design and practice of a comprehensively functional integrated management information system for major construction

    Science.gov (United States)

    Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan

    2017-08-01

    This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the

  11. Managing Key Risks in Post-Merger IS Integration

    DEFF Research Database (Denmark)

    Alaranta, Mar; Mathiassen, L

    2014-01-01

    Mergers and acquisitions (M&A) require organizations to blend together different information system (IS) configurations. Unfortunately, less than 50 percent of M&A's achieve their goals, with IS integration being a major problem. Here, the authors offer a framework to help managers prepare for......, analyze, and mitigate risks during post-merger IS integration. They identify key risks relating to IS integration content, process, and context, and present five strategies for mitigating those risks. Their framework aims to help managers proactively reduce the impact of adverse events. Adopting...... the framework supported by their templates is straightforward and the time and resources required are minimal. When properly executed, adoption increases the likelihood of successful merger outcomes; the framework is thus a valuable addition to the management tool box and can be applied in collaboration...

  12. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P.; Jaerventausta, P.; Kaerenlampi, M.; Paulasaari, H. [Tampere Univ. of Technology (Finland); Partanen, J. [Lappeenranta Univ. of Technology (Finland)

    1996-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  13. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P; Jaerventausta, P; Kaerenlampi, M; Paulasaari, H [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1997-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  14. US-75 ICM system as-built design : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    This As-Built document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that indepen...

  15. EFFECTIVE CONTROL SYSTEM OF THE INTEGRATED INDUSTRIAL COMPANY

    Directory of Open Access Journals (Sweden)

    K. A. Dyundik

    2015-01-01

    Full Text Available In article the organizational and administrative structure of the integrated metallurgical company is investigated. It is shown that linearly – a staff control system to become a limiting factor in its development. Management of transformations represents purposeful translation process of the integrated metallurgical company in a new qualitative state. The purpose . The subject of the article is to analyze the organization of management, to improve it on the basis of a new conceptual approach to the modernization of the control system integrated steel companies and the allocation of the subsystems.Methodology. The methodological basis of this article are the comparative analysis methods.The Results. Studied approaches to the development of integrated management of the metallurgical company, the possibility of change.Conclusions / signifi cance. Management development in an integrated steel company requires in-depth study of existing internal operating conditions and specifi cs of the company, as well as the planning and implementation of measures to improve its receptivity to innovation.

  16. A hybrid design methodology for structuring an Integrated Environmental Management System (IEMS) for shipping business.

    Science.gov (United States)

    Celik, Metin

    2009-03-01

    The International Safety Management (ISM) Code defines a broad framework for the safe management and operation of merchant ships, maintaining high standards of safety and environmental protection. On the other hand, ISO 14001:2004 provides a generic, worldwide environmental management standard that has been utilized by several industries. Both the ISM Code and ISO 14001:2004 have the practical goal of establishing a sustainable Integrated Environmental Management System (IEMS) for shipping businesses. This paper presents a hybrid design methodology that shows how requirements from both standards can be combined into a single execution scheme. Specifically, the Analytic Hierarchy Process (AHP) and Fuzzy Axiomatic Design (FAD) are used to structure an IEMS for ship management companies. This research provides decision aid to maritime executives in order to enhance the environmental performance in the shipping industry.

  17. Assessment of Integrated Information System (IIS) in organization ...

    African Journals Online (AJOL)

    Assessment of Integrated Information System (IIS) in organization. ... to enable the Information System (IS) managers, as well as top management to understand the ... since organisational and strategic aspects in IIS should also be considered.

  18. Integrated Information System for Higher Education Qualifications

    Directory of Open Access Journals (Sweden)

    Catalin Ionut SILVESTRU

    2012-10-01

    Full Text Available In the present article we aim to study thoroughly and detail aspects related to architectures specific for e-learning and management of human resources training interconnected to management of qualifications. In addition, we take into consideration combining e-learning architectures with software in an e-learning system interconnected with the National Registry of Qualifications of Higher Education, in view of developing and information system that correlates educational supply from higher education from Romania with labor market demands through qualifications. The scientific endeavor consists of original architectural solutions to integrate data, systems, processes, services from various sources and to use them in the proposed system. The practical result of the scientific endeavor is represented by design of architectures required for developing an e-learning system interconnected with the National Registry of Qualifications from Romania, which involve in first stage the qualifications provided by higher education. The proposed innovative solution consists in the fact that the proposed information system combines the advantages of content management system (CMS with learning content management system (LCMS and with reusable learning objects (RLO. Thus, the architecture proposed in the research ensures the integration of a content management system with a portal for information, guidance and support in making a professional project. The integration enables correlation of competences with content areas and specific items from various teaching subjects, thus evaluating the usefulness for this registry from learning/educational perspective. Using the proposed information system in enables correlation among qualifications, content of educational program and continuous self-evaluation opportunities, which facilitate monitoring of progress and adjustment of learning content.

  19. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  20. Information management systems for integrating the technical data and regulatory requirements of environmental restoration activities

    International Nuclear Information System (INIS)

    Geffen, C.A.; Garrett, B.A.; Walter, M.B.

    1990-03-01

    Current environmental regulations require that comprehensive planning be conducted before remediating a hazardous waste site to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. Remediation of Department of Energy (DOE) sites contaminated with hazardous or mixed wastes will require the effective integration of scientific and engineering data with regulatory and institutional requirements. The information management challenge presented by waste site cleanup activities goes beyond merely dealing with the large quantity of data that will be generated. The information must be stored, managed, and presented in a way that provides some consistency in approach across sites, avoids duplication of effort, and facilitates responses to requests for information from the regulators and the public. This paper provides background information on the regulatory requirements for data gathering and analysis for environmental restoration activities, and outlines the data and information management requirements for completing the pre-remediation phases of an environmental restoration project. Information management systems for integrating the regulatory and institutional requirements of the environmental restoration process with the technical data and analysis requirements are also described. 7 refs

  1. IM (Integrity Management) software must show flexibility to local codes

    Energy Technology Data Exchange (ETDEWEB)

    Brors, Markus [ROSEN Technology and Research Center GmbH (Germany); Diggory, Ian [Macaw Engineering Ltd., Northumberland (United Kingdom)

    2009-07-01

    There are many internationally recognized codes and standards, such as API 1160 and ASME B31.8S, which help pipeline operators to manage and maintain the integrity of their pipeline networks. However, operators in many countries still use local codes that often reflect the history of pipeline developments in their region and are based on direct experience and research on their pipelines. As pipeline companies come under increasing regulatory and financial pressures to maintain the integrity of their networks, it is important that operators using regional codes are able to benchmark their integrity management schemes against these international standards. Any comprehensive Pipeline Integrity Management System (PIMS) software package should therefore not only incorporate industry standards for pipeline integrity assessment but also be capable of implementing regional codes for comparison purposes. This paper describes the challenges and benefits of incorporating one such set of regional pipeline standards into ROSEN Asset Integrity Management Software (ROAIMS). (author)

  2. [Management, quality of health and occupational safety and hospital organization: is integration possible?].

    Science.gov (United States)

    Corrao, Carmela Romana Natalina

    2011-01-01

    The evolution of the national and European legislation has progressively transformed the working environments into organized environments. Specific models for its management are being proposed, which should be integrated into general management strategies. In the case of hospitals this integration should consider the peculiar organizational complexity, where the management of the occupational risk needs to be integrated with clinical risk management and economic risk management. Resources management should also consider that Occupational Medicine has not a direct monetary benefit for the organisation, but only indirect health consequences in terms of reduction of accidents and occupational diseases. The deep and simultaneous analysis of the current general management systems and the current management methods of occupational safety and health protection allows one to hyphotesise a possible integration between them. For both of them the Top Management is the main responsible of the quality management strategies and the use of specific documents in the managerial process, such as the document of risks evaluation in the occupational management and the quality manual in the general management, is of paramount importance. An integrated management has also the scope to pursue a particular kind of quality management, where ethics and job satisfaction are innovative, as established by recent European guidelines, management systems and national legislations.

  3. Interface management for the Mined Geologic Disposal System

    International Nuclear Information System (INIS)

    Ashlock, K.J.; Sellers, M.D.

    1998-01-01

    The Management and Operations (M and O) contractor for the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) program exists to support DOE in the successful development and operation of an integrated system to manage the nation's spent nuclear fuel and high-level wastes. As part of the system engineering and integration performed on the Yucca Mountain Project (YMP), interface management is critical in the development of the Mined Geologic Disposal System (MGDS). The application of interface management on the YMP directly addresses integration between physical elements of the MGDS and the organizations responsible for their development. An initiative to utilize interface management and the interface control document development process for organizational interfaces is also being pursued to help ensure consistent use of information by multiple organizations

  4. IAEA Safety Standards on Management Systems and Safety Culture

    International Nuclear Information System (INIS)

    Persson, Kerstin Dahlgren

    2007-01-01

    The IAEA has developed a new set of Safety Standard for applying an integrated Management System for facilities and activities. The objective of the new Safety Standards is to define requirements and provide guidance for establishing, implementing, assessing and continually improving a Management System that integrates safety, health, environmental, security, quality and economic related elements to ensure that safety is properly taken into account in all the activities of an organization. With an integrated approach to management system it is also necessary to include the aspect of culture, where the organizational culture and safety culture is seen as crucial elements of the successful implementation of this management system and the attainment of all the goals and particularly the safety goals of the organization. The IAEA has developed a set of service aimed at assisting it's Member States in establishing. Implementing, assessing and continually improving an integrated management system. (author)

  5. IDMT, Integrated Decommissioning Management Tools

    International Nuclear Information System (INIS)

    Alemberti, A.; Castagna, P.; Marsiletti, M.; Orlandi, S.; Perasso, L.; Susco, M.

    2005-01-01

    Nuclear Power Plant decommissioning requires a number of demolition activities related to civil works and systems as well as the construction of temporary facilities used for treatment and conditioning of the dismantled parts. The presence of a radiological, potentially hazardous, environment due to the specific configuration and history of the plant require a professional, expert and qualified approach approved by the national safety authority. Dismantling activities must be designed, planned and analysed in detail during an evaluation phase taking into account different scenarios generated by possible dismantling sequences and specific waste treatments to be implemented. The optimisation process of the activities becomes very challenging taking into account the requirement of the minimisation of the radiological impact on exposed workers and people during normal and accident conditions. While remote operated equipment, waste treatment and conditioning facilities may be designed taking into account this primary goal also a centralised management system and corresponding software tools have to be designed and operated in order to guarantee the fulfilment of the imposed limits as well as the traceability of wastes. Ansaldo Nuclear Division has been strongly involved in the development of a qualified and certified software environment to manage the most critical activities of a decommissioning project. The IDMT system (Integrated Decommissioning Management Tools) provide a set of stand alone user friendly applications able to work in an integrated configuration to guarantee waste identification, traceability during treatment and conditioning process as well as location and identification at the Final Repository site. Additionally, the system can be used to identify, analyse and compare different specific operating scenarios to be optimised in term of both economical and radiological considerations. The paper provides an overview of the different phases of

  6. Integrating environmental monitoring with cumulative effects management and decision making.

    Science.gov (United States)

    Cronmiller, Joshua G; Noble, Bram F

    2018-05-01

    Cumulative effects (CE) monitoring is foundational to emerging regional and watershed CE management frameworks, yet monitoring is often poorly integrated with CE management and decision-making processes. The challenges are largely institutional and organizational, more so than scientific or technical. Calls for improved integration of monitoring with CE management and decision making are not new, but there has been limited research on how best to integrate environmental monitoring programs to ensure credible CE science and to deliver results that respond to the more immediate questions and needs of regulatory decision makers. This paper examines options for the integration of environmental monitoring with CE frameworks. Based on semistructured interviews with practitioners, regulators, and other experts in the Lower Athabasca, Alberta, Canada, 3 approaches to monitoring system design are presented. First, a distributed monitoring system, reflecting the current approach in the Lower Athabasca, where monitoring is delegated to different external programs and organizations; second, a 1-window system in which monitoring is undertaken by a single, in-house agency for the purpose of informing management and regulatory decision making; third, an independent system driven primarily by CE science and understanding causal relationships, with knowledge adopted for decision support where relevant to specific management questions. The strengths and limitations of each approach are presented. A hybrid approach may be optimal-an independent, nongovernment, 1-window model for CE science, monitoring, and information delivery-capitalizing on the strengths of distributed, 1-window, and independent monitoring systems while mitigating their weaknesses. If governments are committed to solving CE problems, they must invest in the long-term science needed to do so; at the same time, if science-based monitoring programs are to be sustainable over the long term, they must be responsive to

  7. Integrated Management System in construction company-effective tool of quality, environment and safety level improving

    OpenAIRE

    Gašparík, Jozef

    2009-01-01

    Contribution Presents the struCture of integrated M anageMent systeM ( iMs) according to international standards ISO 9001:2008, ISO 14001:2004 and STN OHSAS 18001:2009, which consists of 3 management systems focused to quality, environment and safety of building processes. The purpose of paper is to describe basic steps concerning the development of IMS. Paper analises basic processes of IMS like company vision, IMS planning, implementing, monitoring, revive and improving. The paper presents ...

  8. The development of pipeline integrity management in the world and practice in China

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Qing, Wang; Feifan [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    The paper analyzed the pipeline integrity management latest development, and the relationship among HSE management, pipeline integrity management (PIM) and asset integrity management (AIM). CNPC is a pioneer of China industry on implementation of pipeline integrity management by using latest developed technologies such as in-line inspection, GIS, Risk assessment and advanced repair technologies, and it is typical model of PIM in China pipeline who supply the gas to whole Beijing city. With smart pigging inspection and implementation of GIS and EAM(enterprise assets management) system on two thousand kilometers of Shaanxi-Beijing gas pipeline BHGC is able to manage pipeline integrity in five areas which include pipe materials safety, nature and geotechnical hazards management, coating and corrosion protection, stationing and associated facilities maintenance, and underground gas storage integrity. This paper presents latest achievement of BHGC in their pipeline integrity programs. (author)

  9. Integrated management data system for radioactive waste repositories (SGI3R) - development of the inventory module

    International Nuclear Information System (INIS)

    Silva, Fabio; Tello, Cledola Cassia O. de

    2011-01-01

    In Brazil, CNEN is responsible for the intermediate and final storage of radioactive waste generated in the country. The CDTN/CNEN coordinates the RBMN Project for the implementation of the National Repository for disposal radioactive waste of low- and intermediate-level. The results of this Project should be presented so that all data being easily retrievable and useful for all institutions involved, including the regulators. To achieve this goal it was developed at the Waste Management Department - SEGRE/CDTN - a management database system, called 'Integrated Management System for the Management of Repository for Radioactive Waste' (SGI3R). The System consists of relational tables, forms and reports, preserving all available information, avoiding duplication of efforts, additional costs, and it will additionally give support to improve the management of RBMN Project. This paper presents a summary of this development with emphasis on the INVENTORY Module. The data from the inventory of disused sealed sources, which are stored in CDTN, were used to test the functionality of this module and of the SGI3R. These sources were categorized according to guidelines of the IAEA, and it was also presented how they should be safely managed over time. (author)

  10. Integrated Identity and Access Management System for Tertiary ...

    African Journals Online (AJOL)

    Nigerian Journal of Technology ... identity management and access control and the unavailability of actionable information on pattern of ... This Tertiary Identity and Access Management System (T-IAMS) is a fingerprint biometric database that ...

  11. Integrating school-based and therapeutic conflict management models at schools.

    Science.gov (United States)

    D'Oosterlinck, Franky; Broekaert, Eric

    2003-08-01

    Including children with emotional and behavioral needs in mainstream school systems leads to growing concern about the increasing number of violent and nonviolent conflicts. Schools must adapt to this evolution and adopt a more therapeutic dimension. This paper explores the possibility of integrating school-based and therapeutic conflict management models and compares two management models: a school-based conflict management program. Teaching Students To Be Peacemakers; and a therapeutic conflict management program, Life Space Crisis Intervention. The authors conclude that integration might be possible, but depends on establishing a positive school atmosphere, the central position of the teacher, and collaborative and social learning for pupils. Further implementation of integrated conflict management models can be considered but must be underpinned by appropriate scientific research.

  12. Integrated waste management and the tool of life cycle inventory : a route to sustainable waste management

    Energy Technology Data Exchange (ETDEWEB)

    McDougall, F.R.; White, P.R. [Procter and Gamble Newcastle Technical Centre, Newcastle (United Kingdom). Corporate Sustainable Development

    2000-07-01

    An overall approach to municipal waste management which integrates sustainable development principles was discussed. The three elements of sustainability which have to be balanced are environmental effectiveness, economic affordability and social acceptability. An integrated waste management (IWM) system considers different treatment options and deals with the entire waste stream. A life cycle inventory (LCI) and life cycle assessment (LCA) is used to determine the environmental burdens associated with IWM systems. LCIs for waste management are currently available for use in Europe, the United States, Canada and elsewhere. LCI is being used by waste management companies to assess the environmental attributes of future contract tenders. The models are used as benchmarking tools to assess the current environmental profile of a waste management system. They are also a comparative planning and communication tool. The authors are currently looking into publishing, at a future date, the experience of users of this LCI environmental management tool. 12 refs., 3 figs.

  13. Planning and Resource Management in an Intelligent Automated Power Management System

    Science.gov (United States)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  14. Development of system integration technology for integral reactor

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Moon Hee; Kang, D. J.; Kim, K. K. and others

    1999-03-01

    The objective of this report is to integrate the conceptual design of an integral reactor, SMART producing thermal energy of 330 MW, which will be utilized to supply energy for seawater desalination and small-scale power generation. This project also aims to develop system integration technology for effective design of the reactor. For the conceptual design of SMART, preliminary design requirements including the top-tier requirements and design bases were evaluated and established. Furthermore, in the view of the application of codes and standards to the SMART design, existing laws, codes and standards were analyzed and evaluated with respect to its applicability. As a part of this evaluation, directions and guidelines were proposed for the development of new codes and standards which shall be applied to the SMART design. Regarding the integration of SMART conceptual designs, major design activities and interfaces between design departments were established and coordinated through the design process. For the effective management of all design schedules, a work performance evaluation system was developed and applied to the design process. As the results of this activity, an integrated output of SMART designs was produced. Two additional scopes performed in this project include the preliminary economic analysis on the SMART utilization for seawater desalination, and the planning of verification tests for technology implemented into SMART and establishing development plan of the computer codes to be used for SMART design in the next phase. The technical cooperation with foreign country and international organization for securing technologies for integral reactor design and its application was coordinated and managed through this project. (author)

  15. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  16. The nexus between integrated natural resources management and integrated water resources management in southern Africa

    Science.gov (United States)

    Twomlow, Stephen; Love, David; Walker, Sue

    The low productivity of smallholder farming systems and enterprises in the drier areas of the developing world can be attributed mainly to the limited resources of farming households and the application of inappropriate skills and practices that can lead to the degradation of the natural resource base. This lack of development, particularly in southern Africa, is of growing concern from both an agricultural and environmental perspective. To address this lack of progress, two development paradigms that improve land and water productivity have evolved, somewhat independently, from different scientific constituencies. One championed by the International Agricultural Research constituency is Integrated Natural Resource Management (INRM), whilst the second championed predominantly by Environmental and Civil Engineering constituencies is Integrated Water Resources Management (IWRM). As a result of similar objectives of working towards the millennium development goals of improved food security and environmental sustainability, there exists a nexus between the constituencies of the two paradigms, particularly in terms of appreciating the lessons learned. In this paper lessons are drawn from past INRM research that may have particular relevance to IWRM scientists as they re-direct their focus from blue water issues to green water issues, and vice-versa. Case studies are drawn from the management of water quality for irrigation, green water productivity and a convergence of INRM and IWRM in the management of gold panning in southern Zimbabwe. One point that is abundantly clear from both constituencies is that ‘one-size-fits-all’ or silver bullet solutions that are generally applicable for the enhancement of blue water management/formal irrigation simply do not exist for the smallholder rainfed systems.

  17. Using integrated information systems in supply chain management

    Science.gov (United States)

    Gonzálvez-Gallego, Nicolás; Molina-Castillo, Francisco-Jose; Soto-Acosta, Pedro; Varajao, Joao; Trigo, Antonio

    2015-02-01

    The aim of this paper is to empirically test not only the direct effects of information and communication technology (ICT) capabilities and integrated information systems (IS) on firm performance, but also the moderating role of IS integration along the supply chain in the relationship between ICT external and capabilities and business performance. Data collected from 102 large Iberian firms from Spain and Portugal are used to test the research model. The hierarchical multiple regression analysis is employed to test the direct effects and the moderating relationships proposed. Results show that external and internal ICT capabilities are important drivers of firm performance, while merely having integrated IS do not lead to better firm performance. In addition, a moderating effect of IS integration in the relationship between ICT capabilities and business performance is found, although this integration only contributes to firm performance when it is directed to connect with suppliers or customers rather than when integrating the whole supply chain.

  18. Material and energy recovery in integrated waste management systems. An evaluation based on life cycle assessment

    International Nuclear Information System (INIS)

    Giugliano, Michele; Cernuschi, Stefano; Grosso, Mario; Rigamonti, Lucia

    2011-01-01

    This paper reports the environmental results, integrated with those arising from mass and energy balances, of a research project on the comparative analysis of strategies for material and energy recovery from waste, funded by the Italian Ministry of Education, University and Research. The project, involving the cooperation of five University research groups, was devoted to the optimisation of material and energy recovery activities within integrated municipal solid waste (MSW) management systems. Four scenarios of separate collection (overall value of 35%, 50% without the collection of food waste, 50% including the collection of food waste, 65%) were defined for the implementation of energetic, environmental and economic balances. Two sizes of integrated MSW management system (IWMS) were considered: a metropolitan area, with a gross MSW production of 750,000 t/year and an average province, with a gross MSW production of 150,000 t/year. The environmental analysis was conducted using Life Cycle Assessment methodology (LCA), for both material and energy recovery activities. In order to avoid allocation we have used the technique of the expansion of the system boundaries. This means taking into consideration the impact on the environment related to the waste management activities in comparison with the avoided impacts related to the saving of raw materials and primary energy. Under the hypotheses of the study, both for the large and for the small IWMS, the energetic and environmental benefits are higher than the energetic and environmental impacts for all the scenarios analysed in terms of all the indicators considered: the scenario with 50% separate collection in a drop-off scheme excluding food waste shows the most promising perspectives, mainly arising from the highest collection (and recycling) of all the packaging materials, which is the activity giving the biggest energetic and environmental benefits. Main conclusions of the study in the general field of the

  19. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  20. [Process orientation as a tool of strategic approaches to corporate governance and integrated management systems].

    Science.gov (United States)

    Sens, Brigitte

    2010-01-01

    The concept of general process orientation as an instrument of organisation development is the core principle of quality management philosophy, i.e. the learning organisation. Accordingly, prestigious quality awards and certification systems focus on process configuration and continual improvement. In German health care organisations, particularly in hospitals, this general process orientation has not been widely implemented yet - despite enormous change dynamics and the requirements of both quality and economic efficiency of health care processes. But based on a consistent process architecture that considers key processes as well as management and support processes, the strategy of excellent health service provision including quality, safety and transparency can be realised in daily operative work. The core elements of quality (e.g., evidence-based medicine), patient safety and risk management, environmental management, health and safety at work can be embedded in daily health care processes as an integrated management system (the "all in one system" principle). Sustainable advantages and benefits for patients, staff, and the organisation will result: stable, high-quality, efficient, and indicator-based health care processes. Hospitals with their broad variety of complex health care procedures should now exploit the full potential of total process orientation. Copyright © 2010. Published by Elsevier GmbH.