WorldWideScience

Sample records for integrated mission management

  1. In-flight Integrated Mission Management System (I-LIMMS)

    National Research Council Canada - National Science Library

    Emmitt, George D; Greco, Steven; Wood, Sidney

    2006-01-01

    The goal of this Phase I SBIR effort was to determine the feasibility and preliminary design of I-LIMMS, an In-flight Lidar Integrated Mission Management System for the processing and visualization...

  2. Integrated dynamic modeling and management system mission analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.K.

    1994-12-28

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied.

  3. Integrated dynamic modeling and management system mission analysis

    International Nuclear Information System (INIS)

    Lee, A.K.

    1994-01-01

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied

  4. A review of Spacelab mission management approach

    Science.gov (United States)

    Craft, H. G., Jr.

    1979-01-01

    The Spacelab development program is a joint undertaking of the NASA and ESA. The paper addresses the initial concept of Spacelab payload mission management, the lessons learned, and modifications made as a result of the actual implementation of Spacelab Mission 1. The discussion covers mission management responsibilities, program control, science management, payload definition and interfaces, integrated payload mission planning, integration requirements, payload specialist training, payload and launch site integration, payload flight/mission operations, and postmission activities. After 3.5 years the outlined overall mission manager approach has proven to be most successful. The approach does allow the mission manager to maintain the lowest overall mission cost.

  5. Mission operations management

    Science.gov (United States)

    Rocco, David A.

    1994-01-01

    Redefining the approach and philosophy that operations management uses to define, develop, and implement space missions will be a central element in achieving high efficiency mission operations for the future. The goal of a cost effective space operations program cannot be realized if the attitudes and methodologies we currently employ to plan, develop, and manage space missions do not change. A management philosophy that is in synch with the environment in terms of budget, technology, and science objectives must be developed. Changing our basic perception of mission operations will require a shift in the way we view the mission. This requires a transition from current practices of viewing the mission as a unique end product, to a 'mission development concept' built on the visualization of the end-to-end mission. To achieve this change we must define realistic mission success criteria and develop pragmatic approaches to achieve our goals. Custom mission development for all but the largest and most unique programs is not practical in the current budget environment, and we simply do not have the resources to implement all of our planned science programs. We need to shift our management focus to allow us the opportunity make use of methodologies and approaches which are based on common building blocks that can be utilized in the space, ground, and mission unique segments of all missions.

  6. IMP - INTEGRATED MISSION PROGRAM

    Science.gov (United States)

    Dauro, V. A.

    1994-01-01

    IMP is a simulation language that is used to model missions around the Earth, Moon, Mars, or other planets. It has been used to model missions for the Saturn Program, Apollo Program, Space Transportation System, Space Exploration Initiative, and Space Station Freedom. IMP allows a user to control the mission being simulated through a large event/maneuver menu. Up to three spacecraft may be used: a main, a target and an observer. The simulation may begin at liftoff, suborbital, or orbital. IMP incorporates a Fehlberg seventh order, thirteen evaluation Runge-Kutta integrator with error and step-size control to numerically integrate the equations of motion. The user may choose oblate or spherical gravity for the central body (Earth, Mars, Moon or other) while a spherical model is used for the gravity of an additional perturbing body. Sun gravity and pressure and Moon gravity effects are user-selectable. Earth/Mars atmospheric effects can be included. The optimum thrust guidance parameters are calculated automatically. Events/maneuvers may involve many velocity changes, and these velocity changes may be impulsive or of finite duration. Aerobraking to orbit is also an option. Other simulation options include line-of-sight communication guidelines, a choice of propulsion systems, a soft landing on the Earth or Mars, and rendezvous with a target vehicle. The input/output is in metric units, with the exception of thrust and weight which are in English units. Input is read from the user's input file to minimize real-time keyboard input. Output includes vehicle state, orbital and guide parameters, event and total velocity changes, and propellant usage. The main output is to the user defined print file, but during execution, part of the input/output is also displayed on the screen. An included FORTRAN program, TEKPLOT, will display plots on the VDT as well as generating a graphic file suitable for output on most laser printers. The code is double precision. IMP is written in

  7. The INTEGRAL mission

    DEFF Research Database (Denmark)

    Winkler, C.; Courvoisier, T.J.L.; Di Cocco, G.

    2003-01-01

    in the X-ray (3-35 keV) and optical (V-band, 550 nm) energy ranges. INTEGRAL carries two main gamma-ray instruments, the spectrometer SPI (Vedrenne et al. 2003)-optimized for the high-resolution gamma-ray line spectroscopy (20 keV-8 MeV), and the imager IBIS (Ubertini et al. 2003)-optimized for high......The ESA observatory INTEGRAL (International Gamma-Ray Astrophysics Laboratory) is dedicated to the fine spectroscopy (2.5 keV FWHM @ 1 MeV) and fine imaging (angular resolution: 12 arcmin FWHM) of celestial gamma-ray sources in the energy range 15 keV to 10 MeV with concurrent source monitoring...... Centre at ESTEC and the Science Data Centre near Geneva. INTEGRAL was launched on 17 October 2002. The observing programme is well underway and sky exposure (until June 2003) reaches similar to1800 ks in the Galactic plane. The prospects are excellent for the scientific community to observe the high...

  8. Autonomous, In-Flight Crew Health Risk Management for Exploration-Class Missions: Leveraging the Integrated Medical Model for the Exploration Medical System Demonstration Project

    Science.gov (United States)

    Butler, D. J.; Kerstman, E.; Saile, L.; Myers, J.; Walton, M.; Lopez, V.; McGrath, T.

    2011-01-01

    The Integrated Medical Model (IMM) captures organizational knowledge across the space medicine, training, operations, engineering, and research domains. IMM uses this knowledge in the context of a mission and crew profile to forecast risks to crew health and mission success. The IMM establishes a quantified, statistical relationship among medical conditions, risk factors, available medical resources, and crew health and mission outcomes. These relationships may provide an appropriate foundation for developing an in-flight medical decision support tool that helps optimize the use of medical resources and assists in overall crew health management by an autonomous crew with extremely limited interactions with ground support personnel and no chance of resupply.

  9. Approach to Spacelab Payload mission management

    Science.gov (United States)

    Craft, H. G.; Lester, R. C.

    1978-01-01

    The nucleus of the approach to Spacelab Payload mission management is the establishment of a single point of authority for the entire payload on a given mission. This single point mission manager will serve as a 'broker' between the individual experiments and the STS, negotiating agreements by two-part interaction. The payload mission manager, along with a small support team, will represent the users in negotiating use of STS accommodations. He will provide the support needed by each individual experimenter to meet the scientific, technological, and applications objectives of the mission with minimum cost and maximum efficiency. The investigator will assume complete responsibility for his experiment hardware definition and development and will take an active role in the integration and operation of his experiment.

  10. INTEGRITY -- Integrated Human Exploration Mission Simulation Facility

    Science.gov (United States)

    Henninger, D.; Tri, T.; Daues, K.

    It is proposed to develop a high -fidelity ground facil ity to carry out long-duration human exploration mission simulations. These would not be merely computer simulations - they would in fact comprise a series of actual missions that just happen to stay on earth. These missions would include all elements of an actual mission, using actual technologies that would be used for the real mission. These missions would also include such elements as extravehicular activities, robotic systems, telepresence and teleoperation, surface drilling technology--all using a simulated planetary landscape. A sequence of missions would be defined that get progressively longer and more robust, perhaps a series of five or six missions over a span of 10 to 15 years ranging in durat ion from 180 days up to 1000 days. This high-fidelity ground facility would operate hand-in-hand with a host of other terrestrial analog sites such as the Antarctic, Haughton Crater, and the Arizona desert. Of course, all of these analog mission simulations will be conducted here on earth in 1-g, and NASA will still need the Shuttle and ISS to carry out all the microgravity and hypogravity science experiments and technology validations. The proposed missions would have sufficient definition such that definitive requirements could be derived from them to serve as direction for all the program elements of the mission. Additionally, specific milestones would be established for the "launch" date of each mission so that R&D programs would have both good requirements and solid milestones from which to build their implementation plans. Mission aspects that could not be directly incorporated into the ground facility would be simulated via software. New management techniques would be developed for evaluation in this ground test facility program. These new techniques would have embedded metrics which would allow them to be continuously evaluated and adjusted so that by the time the sequence of missions is completed

  11. Putting Integrated Systems Health Management Capabilities to Work: Development of an Advanced Caution and Warning System for Next-Generation Crewed Spacecraft Missions

    Science.gov (United States)

    Mccann, Robert S.; Spirkovska, Lilly; Smith, Irene

    2013-01-01

    Integrated System Health Management (ISHM) technologies have advanced to the point where they can provide significant automated assistance with real-time fault detection, diagnosis, guided troubleshooting, and failure consequence assessment. To exploit these capabilities in actual operational environments, however, ISHM information must be integrated into operational concepts and associated information displays in ways that enable human operators to process and understand the ISHM system information rapidly and effectively. In this paper, we explore these design issues in the context of an advanced caution and warning system (ACAWS) for next-generation crewed spacecraft missions. User interface concepts for depicting failure diagnoses, failure effects, redundancy loss, "what-if" failure analysis scenarios, and resolution of ambiguity groups are discussed and illustrated.

  12. CEO Sites Mission Management System (SMMS)

    Science.gov (United States)

    Trenchard, Mike

    2014-01-01

    Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team

  13. Flexible UAV Mission Management Using Emerging Technologies

    National Research Council Canada - National Science Library

    Desimone, Roberto; Lee, Richard

    2002-01-01

    This paper discusses recent results and proposed work in the application of emerging artificial intelligence technologies for flexible mission management, especially for unmanned (combat) airborne vehicles...

  14. The complete integration of MissionLab and CARMEN

    Directory of Open Access Journals (Sweden)

    FJ Serrano Rodriguez

    2017-05-01

    Full Text Available Nowadays, a major challenge in the development of advanced robotic systems is the creation of complex missions for groups of robots, with two main restrictions: complex programming activities not needed and the mission configuration time should be short (e.g. Urban Search And Rescue. With these ideas in mind, we analysed several robotic development environments, such as Robot Operating System (ROS, Open Robot Control Software (OROCOS, MissionLab, Carnegie Mellon Robot Navigation Toolkit (CARMEN and Player/Stage, which are helpful when creating autonomous robots. MissionLab provides high-level features (automatic mission creation, code generation and a graphical mission editor that are unavailable in other significant robotic development environments. It has however some weaknesses regarding its map-based capabilities. Creating, managing and taking advantage of maps for localization and navigation tasks are among CARMEN’s most significant features. This fact makes the integration of MissionLab with CARMEN both possible and interesting. This article describes the resulting robotic development environment, which makes it possible to work with several robots, and makes use of their map-based navigation capabilities. It will be shown that the proposed platform solves the proposed goal, that is, it simplifies the programmer’s job when developing control software for robot teams, and it further facilitates multi-robot deployment task in mission-critical situations.

  15. Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

    Science.gov (United States)

    Mishkin, Andrew; Lee, Young; Korth, David; LeBlanc, Troy

    2007-01-01

    For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

  16. Mission Risk Reduction Regulatory Change Management

    Science.gov (United States)

    Scroggins, Sharon

    2007-01-01

    NASA Headquarters Environmental Management Division supports NASA's mission to pioneer the future in space exploration, scientific discovery, and aeronautics research by integrating environmental considerations into programs and projects early-on, thereby proactively reducing NASA's exposure to institutional, programmatic and operational risk. As part of this effort, NASA established the Principal Center for Regulatory Risk Analysis and Communication (RRAC PC) as a resource for detecting, analyzing, and communicating environmental regulatory risks to the NASA stakeholder community. The RRAC PC focuses on detecting emerging environmental regulations and other operational change drivers that may pose risks to NASA programs and facilities, and effectively communicating the potential risks. For example, regulatory change may restrict how and where certain activities or operations may be conducted. Regulatory change can also directly affect the ability to use certain materials by mandating a production phase-out or restricting usage applications of certain materials. Regulatory change can result in significant adverse impacts to NASA programs and facilities due to NASA's stringent performance requirements for materials and components related to human-rated space vehicles. Even if a regulation does not directly affect NASA operations, U.S. and international regulations can pose program risks indirectly through requirements levied on manufacturers and vendors of components and materials. For example, manufacturers can change their formulations to comply with new regulatory requirements. Such changes can require time-consuming and costly requalification certification for use in human spaceflight programs. The RRAC PC has implemented a system for proactively managing regulatory change to minimize potential adverse impacts to NASA programs and facilities. This presentation highlights the process utilized by the RRACPC to communicate regulatory change and the associated

  17. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  18. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  19. Integrated nursery pest management

    Science.gov (United States)

    R. Kasten Dumroese

    2012-01-01

    What is integrated pest management? Take a look at the definition of each word to better understand the concept. Two of the words (integrated and management) are relatively straightforward. Integrated means to blend pieces or concepts into a unified whole, and management is the wise use of techniques to successfully accomplish a desired outcome. A pest is any biotic (...

  20. Waste management advisory missions to developing countries

    International Nuclear Information System (INIS)

    Thomas, K.T.

    1990-01-01

    The IAEA's Waste Management Advisory Programme (WAMAP) was initiated in 1987 as an interregional technical co-operation project to complement other activities in radioactive waste management. Its creation gave greater recognition to the importance of the safe management of radioactive wastes and promotion of long-term waste management technical assistance strategies for developing countries. Over the past 4 years, international experts have reviewed the radioactive waste management programmes of 29 developing countries. Missions have been conducted within the framework of the IAEA's Waste Management Advisory Programme (WAMAP). Ten of these countries have nuclear power plants in operation or under construction or have nuclear fuel cycle facilities. Altogether, 23 have research reactors or centres, eight have uranium or thorium processing programmes or wastes, and nine essentially have only isotope applications involving the use of radiation sources

  1. Improving Life-Cycle Cost Management of Spacecraft Missions

    Science.gov (United States)

    Clardy, Dennon

    2010-01-01

    This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

  2. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  3. Safety and Mission Assurance Knowledge Management Retention

    Science.gov (United States)

    Johnson, Teresa A.

    2006-01-01

    This viewgraph presentation reviews the issues surrounding the management of knowledge in regards to safety and mission assurance. The JSC workers who were hired in the 1960's are slated to retire in the next two to three years. The experiences and knowledge of these NASA workers must be identified, and disseminated. This paper reviews some of the strategies that the S&MA is developing to capture that valuable institutional knowledge.

  4. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  5. Solid Waste Management Requirements Definition for Advanced Life Support Missions: Results

    Science.gov (United States)

    Alazraki, Michael P.; Hogan, John; Levri, Julie; Fisher, John; Drysdale, Alan

    2002-01-01

    Prior to determining what Solid Waste Management (SWM) technologies should be researched and developed by the Advanced Life Support (ALS) Project for future missions, there is a need to define SWM requirements. Because future waste streams will be highly mission-dependent, missions need to be defined prior to developing SWM requirements. The SWM Working Group has used the mission architecture outlined in the System Integration, Modeling and Analysis (SIMA) Element Reference Missions Document (RMD) as a starting point in the requirement development process. The missions examined include the International Space Station (ISS), a Mars Dual Lander mission, and a Mars Base. The SWM Element has also identified common SWM functionalities needed for future missions. These functionalities include: acceptance, transport, processing, storage, monitoring and control, and disposal. Requirements in each of these six areas are currently being developed for the selected missions. This paper reviews the results of this ongoing effort and identifies mission-dependent resource recovery requirements.

  6. Systems engineering and integration as a foundation for mission engineering

    OpenAIRE

    Beam, David F.

    2015-01-01

    Approved for public release; distribution is unlimited This paper investigates the emerging term mission engineering through the framework of systems engineering and systems integration. Systems engineering concepts, processes, and methodologies are extrapolated for use in conjunction with a systems integration, life-cycle based framework to effect mission engineering. The specific systems engineering concepts of measures of effectiveness, performance and suitability are recommended as fou...

  7. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  8. Managing for Organizational Integrity.

    Science.gov (United States)

    Paine, Lynn Sharp

    1994-01-01

    Compliance-based ethics programs focus on prevention, detection, and punishment. Companies should adopt an integrity-based approach to ethics management that combines a concern for the law with an emphasis on managerial responsibility for ethical behavior. (JOW)

  9. Integrated Health Management Definitions

    Data.gov (United States)

    National Aeronautics and Space Administration — The Joint Army Navy NASA Air Force Modeling and Simulation Subcommittee's Integrated Health Management panel was started about 6 years ago to help foster...

  10. Integrated crisis management exercises

    International Nuclear Information System (INIS)

    Callen, R.B.; DeHart, R.E.

    1994-01-01

    This paper describes some of the steps that Mobil has taken to enhance their crisis management capability and to improve their readiness. The approach stretches from the individual plant level to Mobil's Corporate offices in Fairfax, Virginia. Some of the lessons learned from several integrated crisis management exercises are outlined and some areas where additional industry co-operation in crisis management could pay dividends are suggested

  11. INIR: Integrated Nuclear Infrastructure Review Missions. Guidance on Preparing and Conducting INIR Missions (Rev. 1)

    International Nuclear Information System (INIS)

    2011-04-01

    The IAEA's Integrated Nuclear Infrastructure Review (INIR) missions are designed to assist Member States, at their request, in evaluating the status of their national infrastructure for the introduction of a nuclear power programme. Each INIR mission is coordinated and led by the IAEA and conducted by a team of international experts drawn from Member States who have experience in different aspects of developing and deploying nuclear infrastructure. The IAEA publication Milestones in the Development of a National Infrastructure for Nuclear Power (IAEA Nuclear Energy Series No. NG-G-3.1) contains a description of 19 infrastructure issues to be considered during the different stages of development of a nuclear power programme. The starting point for an INIR mission is a self-evaluation performed by the Member State against these infrastructure issues. Following the self-evaluation, the INIR mission reviews the status of the national nuclear infrastructure, identifies existing gaps in specific infrastructure-related areas and proposes recommendations to fill these gaps. The INIR mission provides Member State representatives with an opportunity to have in depth discussions with international experts about experiences and best practices in different countries. In developing its recommendations, the INIR team takes into account the comments made by the relevant national organizations. Implementation of any of the team's recommendations is at the discretion of the Member State requesting the mission. The results of the INIR mission are expected to help the Member State to develop an action plan to fill any gaps, which in turn will help the development of the national nuclear infrastructure. The IAEA stands ready to assist, as requested and appropriate, in the different steps of this action plan. This guidance publication is directed to assist in preparing and conducting the INIR missions. It was developed under the coordination of the IAEA Integrated Nuclear Infrastructure

  12. A Management Model for International Participation in Space Exploration Missions

    Science.gov (United States)

    George, Patrick J.; Pease, Gary M.; Tyburski, Timothy E.

    2005-01-01

    This paper proposes an engineering management model for NASA's future space exploration missions based on past experiences working with the International Partners of the International Space Station. The authors have over 25 years of combined experience working with the European Space Agency, Japan Aerospace Exploration Agency, Canadian Space Agency, Italian Space Agency, Russian Space Agency, and their respective contractors in the design, manufacturing, verification, and integration of their elements electric power system into the United States on-orbit segment. The perspective presented is one from a specific sub-system integration role and is offered so that the lessons learned from solving issues of technical and cultural nature may be taken into account during the formulation of international partnerships. Descriptions of the types of unique problems encountered relative to interactions between international partnerships are reviewed. Solutions to the problems are offered, taking into consideration the technical implications. Through the process of investigating each solution, the important and significant issues associated with working with international engineers and managers are outlined. Potential solutions are then characterized by proposing a set of specific methodologies to jointly develop spacecraft configurations that benefits all international participants, maximizes mission success and vehicle interoperability while minimizing cost.

  13. Integrated Nuclear Infrastructure Review (INIR) Missions: The First Six Years

    International Nuclear Information System (INIS)

    2015-12-01

    IAEA Integrated Nuclear Infrastructure Review (INIR) missions are designed to assist Member States in evaluating the status of their national infrastructure for the introduction of a nuclear power programme. INIR missions are conducted upon request from the Member State. Each INIR mission is coordinated and led by the IAEA and conducted by a team of IAEA staff and international experts drawn from Member States which have experience in different aspects of developing and deploying nuclear infrastructure. INIR missions cover the 19 infrastructure issues described in Milestones in the Development of a National Infrastructure for Nuclear Power, IAEA Nuclear Energy Series No. NG-G-3.1, published in 2007 and revised in 2015, and the assessment is based on an analysis of a self-evaluation report prepared by the Member State, a review of the documents it provides and interviews with its key officials. Phase 1 INIR missions evaluate the status of the infrastructure to achieve Milestone 1 (Ready to make a knowledgeable commitment to a nuclear power programme). Phase 2 INIR missions evaluate the status of the infrastructure to achieve Milestone 2 (Ready to invite bids/negotiate a contract for the first nuclear power plant). From 2009 to 2014, 14 IAEA INIR missions and follow-ups were conducted in States embarking on a nuclear power programme and one State expanding its programme. During this time, considerable experience was gained by the IAEA on the conduct of INIR missions, and this feedback has been used to continually improve the overall INIR methodology. The INIR methodology has thus evolved and is far more comprehensive today than in 2009. Despite the limited number of INIR missions conducted, some common findings were identified in Member States embarking on nuclear power programmes. This publication summarizes the results of the missions and highlights the most significant areas in which recommendations were made

  14. Radioactive waste management. Ukraine. WAMAP mission to Ukraine

    International Nuclear Information System (INIS)

    Bergman, C.; Samiei, M.; Takats, F.

    1993-01-01

    In February 1992, the Ukrainian State Committee on Nuclear and Radiation Safety IAEA assisted in management of radwaste and spent fuel. A three member IAEA mission was sent to Ukraine for fact-finding. The present report discusses the outcome of this mission. It gives present legislation, regulations and organizational situation in Ukraine and generation and waste management of radioactive wastes. It discusses possible area of technical co-operation, conclusions and recommendations of the mission

  15. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  16. Integrated Pest Management (IPM)

    Science.gov (United States)

    Repellents Rodenticides Other types of pesticides Disponible en español Integrated Pest Management (IPM) IPM Company: IPM is the Key - Oregon State University Extension Service Last updated May 11, 2018 Related Insecticides Natural and Biological Pesticides Repellents Rodenticides Other types of pesticides Disponible en

  17. Safety and Mission Assurance Knowledge Management Retention: Managing Knowledge for Successful Mission Operations

    Science.gov (United States)

    Johnson, Teresa A.

    2006-01-01

    Knowledge Management is a proactive pursuit for the future success of any large organization faced with the imminent possibility that their senior managers/engineers with gained experiences and lessons learned plan to retire in the near term. Safety and Mission Assurance (S&MA) is proactively pursuing unique mechanism to ensure knowledge learned is retained and lessons learned captured and documented. Knowledge Capture Event/Activities/Management helps to provide a gateway between future retirees and our next generation of managers/engineers. S&MA hosted two Knowledge Capture Events during 2005 featuring three of its retiring fellows (Axel Larsen, Dave Whittle and Gary Johnson). The first Knowledge Capture Event February 24, 2005 focused on two Safety and Mission Assurance Safety Panels (Space Shuttle System Safety Review Panel (SSRP); Payload Safety Review Panel (PSRP) and the latter event December 15, 2005 featured lessons learned during Apollo, Skylab, and Space Shuttle which could be applicable in the newly created Crew Exploration Vehicle (CEV)/Constellation development program. Gemini, Apollo, Skylab and the Space Shuttle promised and delivered exciting human advances in space and benefits of space in people s everyday lives on earth. Johnson Space Center's Safety & Mission Assurance team work over the last 20 years has been mostly focused on operations we are now beginning the Exploration development program. S&MA will promote an atmosphere of knowledge sharing in its formal and informal cultures and work processes, and reward the open dissemination and sharing of information; we are asking "Why embrace relearning the "lessons learned" in the past?" On the Exploration program the focus will be on Design, Development, Test, & Evaluation (DDT&E); therefore, it is critical to understand the lessons from these past programs during the DDT&E phase.

  18. Integrated groundwater data management

    Science.gov (United States)

    Fitch, Peter; Brodaric, Boyan; Stenson, Matt; Booth, Nathaniel; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    The goal of a data manager is to ensure that data is safely stored, adequately described, discoverable and easily accessible. However, to keep pace with the evolution of groundwater studies in the last decade, the associated data and data management requirements have changed significantly. In particular, there is a growing recognition that management questions cannot be adequately answered by single discipline studies. This has led a push towards the paradigm of integrated modeling, where diverse parts of the hydrological cycle and its human connections are included. This chapter describes groundwater data management practices, and reviews the current state of the art with enterprise groundwater database management systems. It also includes discussion on commonly used data management models, detailing typical data management lifecycles. We discuss the growing use of web services and open standards such as GWML and WaterML2.0 to exchange groundwater information and knowledge, and the need for national data networks. We also discuss cross-jurisdictional interoperability issues, based on our experience sharing groundwater data across the US/Canadian border. Lastly, we present some future trends relating to groundwater data management.

  19. Journal of Mind and Medical Sciences: translational and integrative mission

    Directory of Open Access Journals (Sweden)

    David L. Rowland

    2017-04-01

    Full Text Available Initiated four years ago, Journal of Mind and Medical Sciences (J Mind Med Sci. established the mission to publish papers on mental and medical topics in distinct but closely interrelated domains. The editorial policy especially encourages interdisciplinary and integrative perspectives, being equally focused on basic research and clinical investigations and short reports. The journal adheres to the philosophy that high quality, original ideas and information should be readily accessible and freely shared within and amongst the scientific community. Accordingly, J Mind Med Sci. is an online, open access, non-for-profit journal which, because of individual/ private support, has levied no charges for submission, review, and publication of articles. All published articles may be freely downloaded and used by anyone from anywhere for scientific purposes. Journal of Mind and Medical Sciences is published by ValpoScholar/ Valparaiso University using the leading institutional repository platform of Digital Commons (powered by Bepress and under the local management of Jon Bull, Library Services, Valparaiso University, which combines submission management, editorial, and peer-review tools into a unique and flexible publishing software system. These editorial and publishing norms have facilitated the journal’s evolution, now indexed and abstracted in several international respected databases. Journal visibility is wide among international academic institutions and readers, as documented by the number of downloaded articles cited in respected journals, some indexed by Thomson Reuters and having high impact factors. In addition, published authors in J Mind Med Sci. periodically receive a statistical report about views / downloads of their articles. It is a pleasure and honor to thank all those who have thus far supported the journal activity (authors, reviewers, editorial board and assistance, publishing support, and to further invite and encourage

  20. Integrated parasite management

    DEFF Research Database (Denmark)

    Clausen, Jesper Hedegaard; Madsen, Henry; Van, Phan Thi

    2015-01-01

    communities at risk through mass drug administration. However, we argue that treatment alone will not reduce the risk from eating infected fish and that sustainable effective control must adopt an integrated FZT control approach based on education, infrastructure improvements, and management practices...... that target critical control points in the aquaculture production cycle identified from a thorough understanding of FZT and host biology and epidemiology. We present recommendations for an integrated parasite management (IPM) program for aquaculture farms.......Fishborne zoonotic trematodes (FZT) are an emerging problem and there is now a consensus that, in addition to wild-caught fish, fish produced in aquaculture present a major food safety risk, especially in Southeast Asia where aquaculture is important economically. Current control programs target...

  1. Management of information for mission operations using automated keyword referencing

    Science.gov (United States)

    Davidson, Roger A.; Curran, Patrick S.

    1993-01-01

    Although millions of dollars have helped to improve the operability and technology of ground data systems for mission operations, almost all mission documentation remains bound in printed volumes. This form of documentation is difficult and timeconsuming to use, may be out-of-date, and is usually not cross-referenced with other related volumes of mission documentation. A more effective, automated method of mission information access is needed. A new method of information management for mission operations using automated keyword referencing is proposed. We expound on the justification for and the objectives of this concept. The results of a prototype tool for mission information access that uses a hypertextlike user interface and existing mission documentation are shared. Finally, the future directions and benefits of our proposed work are described.

  2. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  3. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  4. Journal of Mind and Medical Sciences: translational and integrative mission

    OpenAIRE

    David L. Rowland; Ion G. Motofei

    2017-01-01

    Initiated four years ago, Journal of Mind and Medical Sciences (J Mind Med Sci.) established the mission to publish papers on mental and medical topics in distinct but closely interrelated domains. The editorial policy especially encourages interdisciplinary and integrative perspectives, being equally focused on basic research and clinical investigations and short reports. The journal adheres to the philosophy that high quality, original ideas and information should be readily accessibl...

  5. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  6. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  7. Integrated refinery waste management

    Energy Technology Data Exchange (ETDEWEB)

    Shieh, Y -S [ETG Environmental, Inc., Blue Bell, PA (US); Sheehan, W J [Separation and Recovery Systems, Inc., Irvine, CA (US)

    1992-01-01

    In response to the RCRA land ban regulations and TC rule promulgated by the U.S. Federal Environmental Protection Agency (EPA) in 1988-1990, an Integrated Refinery Waste Management (IRWM) program has been developed to provide cost-effective solutions to petroleum industry customers. The goal of IRWM is to provide technology based remediation treatment services to manage sludges and wastewaters generated from the oil refining processes, soils contaminated with petroleum distillates and groundwater contaminated with fuels. Resource recovery, volume reduction and waste minimization are the primary choices to mitigate environmental problems. Oil recovery has been performed through phase separation (such as centrifugation and filtration) and heating of heavy oils. Volume reduction is achieved by dewatering systems such as centrifuges and filter presses, and low temperature thermal treatment. Waste minimization can be accomplished by bioremediation and resource recovery through a cement kiln. (Author).

  8. Space Mission Operations Ground Systems Integration Customer Service

    Science.gov (United States)

    Roth, Karl

    2014-01-01

    , and cultural differences, to ensure an efficient response to customer issues using a small Customer Service Team (CST) and adaptability, constant communication with customers, technical expertise and knowledge of services, and dedication to customer service. The HOSC Customer Support Team has implemented a variety of processes, and procedures that help to mitigate the potential problems that arise when integrating ground system services for a variety of complex missions and the lessons learned from this experience will lead the future of customer service in the space operations industry.

  9. Making Technology Ready: Integrated Systems Health Management

    Science.gov (United States)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  10. Integrated Systems Health Management for Space Exploration

    Science.gov (United States)

    Uckun, Serdar

    2005-01-01

    Integrated Systems Health Management (ISHM) is a system engineering discipline that addresses the design, development, operation, and lifecycle management of components, subsystems, vehicles, and other operational systems with the purpose of maintaining nominal system behavior and function and assuring mission safety and effectiveness under off-nominal conditions. NASA missions are often conducted in extreme, unfamiliar environments of space, using unique experimental spacecraft. In these environments, off-nominal conditions can develop with the potential to rapidly escalate into mission- or life-threatening situations. Further, the high visibility of NASA missions means they are always characterized by extraordinary attention to safety. ISHM is a critical element of risk mitigation, mission safety, and mission assurance for exploration. ISHM enables: In-space maintenance and repair; a) Autonomous (and automated) launch abort and crew escape capability; b) Efficient testing and checkout of ground and flight systems; c) Monitoring and trending of ground and flight system operations and performance; d) Enhanced situational awareness and control for ground personnel and crew; e) Vehicle autonomy (self-sufficiency) in responding to off-nominal conditions during long-duration and distant exploration missions; f) In-space maintenance and repair; and g) Efficient ground processing of reusable systems. ISHM concepts and technologies may be applied to any complex engineered system such as transportation systems, orbital or planetary habitats, observatories, command and control systems, life support systems, safety-critical software, and even the health of flight crews. As an overarching design and operational principle implemented at the system-of-systems level, ISHM holds substantial promise in terms of affordability, safety, reliability, and effectiveness of space exploration missions.

  11. Data management in the mission data system

    Science.gov (United States)

    Wagner, David A.

    2005-01-01

    As spacecraft evolve from simple embedded devices to become more sophisticated computing platforms with complex behaviors it is increasingly necessary to model and manage the flow of data, and to provide uniform models for managing data that promote adaptability, yet pay heed to the physical limitations of the embedded and space environments.

  12. Integrated Disability Management

    Directory of Open Access Journals (Sweden)

    Silvia Angeloni

    2013-10-01

    Full Text Available This article sets out to increase awareness regarding the wide and universal significance of disability, as well as the important benefits of an Integrated Disability Management (IDM approach. The scientific basis for IDM is explored in the first place through an analysis of its relationship to the International Classification of Functioning, Disability and Health (ICF. The conceptual paradigm of the ICF shares an ideological position with the IDM approach in that they are both underpinned by dynamic and multidimensional constructions of disability, which imply equally holistic and interdisciplinary responses. The IDM approach can be applied across a diversity of human situations to provide solutions that reflect the multifaceted and widespread nature of disability. The IDM approach is intended as a strategy capable of handling: inclusion of people with disabilities, active aging of human resources, health and safety in the workplace, prevention of disabilities and various diseases, return-to-work, absenteeism, and presenteeism.

  13. Management of Operational Support Requirements for Manned Flight Missions

    Science.gov (United States)

    1991-01-01

    This Instruction establishes responsibilities for managing the system whereby operational support requirements are levied for support of manned flight missions including associated payloads. This management system will ensure that support requirements are properly requested and responses are properly obtained to meet operational objectives.

  14. Overview of an Integrated Medical System for Exploration Missions

    Science.gov (United States)

    Watkins, Sharmila; Rubin, David

    2013-01-01

    The Exploration Medical Capability (ExMC) element of the NASA Human Research Program (HRP) is charged with addressing the risk of unacceptable health and mission outcomes due to limitations of inflight medical capabilities. The Exploration Medical System Demonstration (EMSD) is a project within the ExMC element aimed at reducing this risk by improving the medical capabilities available for exploration missions. The EMSD project will demonstrate, on the ground and on ISS, the integration of several components felt to be essential to the delivery of medical care during long ]duration missions outside of low Earth orbit. The components of the EMSD include the electronic medical record, assisted medical procedure software, medical consumables tracking technology and RFID ] tagged consumables, video conferencing capability, ultrasound device and probes (ground demonstration only), peripheral biosensors, and the software to allow communication among the various components (middleware). This presentation seeks to inform our international partners of the goals and objectives of the EMSD and to foster collaboration opportunities related to this and future projects.

  15. Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

    Science.gov (United States)

    Dunn, Michael R.

    2014-01-01

    Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

  16. Sustainability in Project Management: Vision, Mission, Ambition

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius

    2012-01-01

    Sustainability is one of the most important challenges of our time. How can we develop prosperity, without compromising the life of future generations? Companies are integrating ideas of sustainability in their marketing, corporate communication, annual reports and in their actions. The concept of

  17. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  18. Integrated pest management

    International Nuclear Information System (INIS)

    LaBrecque, G.C.

    1981-01-01

    An effective Integrated Pest Management (IPM) programme requires a thorough knowledge of the biology of the target species, namely information on the dispersal, population densities and dynamics as well as the ecology of the natural enemies of the pest. Studies on these can be accomplished by radiolabelling techniques. In the event that conditions prevent the use of radioisotopes the insects can be labelled with either a rare earth or stable isotopes. All insects treated with the rare earths, once captured, are exposed to neutrons which produce radioactivity in the rare earths. There are two other approaches in the practical application of radiation to the problem of insect control: the exposure of insects to lethal doses of radiation and the release of sterile insects. The Insect and Pest Control Section contributes to all aspects of the sterile insect technique (SIT) and it is involved in the Agency's Coordinated Research Programme which permits scientists from the developing countries to meet to discuss agricultural problems and to devise means of solving crop-pest infestation problems by using isotopes and radiation. The success of radiation in insect pest control was underlined and reviewed at the international symposium on the sterile insect technique and the use of radiation in genetic insect control jointly organized by the FAO and the IAEA and held in the FRG in 1981. Another important action is the BICOT programme in Nigeria between the IAEA and the Government of Nigeria on the biological control of tsetse flies by SIT

  19. IMPERA: Integrated Mission Planning for Multi-Robot Systems

    Directory of Open Access Journals (Sweden)

    Daniel Saur

    2015-10-01

    Full Text Available This paper presents the results of the project IMPERA (Integrated Mission Planning for Distributed Robot Systems. The goal of IMPERA was to realize an extraterrestrial exploration scenario using a heterogeneous multi-robot system. The main challenge was the development of a multi-robot planning and plan execution architecture. The robot team consists of three heterogeneous robots, which have to explore an unknown environment and collect lunar drill samples. The team activities are described using the language ALICA (A Language for Interactive Agents. Furthermore, we use the mission planning system pRoPhEt MAS (Reactive Planning Engine for Multi-Agent Systems to provide an intuitive interface to generate team activities. Therefore, we define the basic skills of our team with ALICA and define the desired goal states by using a logic description. Based on the skills, pRoPhEt MAS creates a valid ALICA plan, which will be executed by the team. The paper describes the basic components for communication, coordinated exploration, perception and object transportation. Finally, we evaluate the planning engine pRoPhEt MAS in the IMPERA scenario. In addition, we present further evaluation of pRoPhEt MAS in more dynamic environments.

  20. Management of the science ground segment for the Euclid mission

    Science.gov (United States)

    Zacchei, Andrea; Hoar, John; Pasian, Fabio; Buenadicha, Guillermo; Dabin, Christophe; Gregorio, Anna; Mansutti, Oriana; Sauvage, Marc; Vuerli, Claudio

    2016-07-01

    Euclid is an ESA mission aimed at understanding the nature of dark energy and dark matter by using simultaneously two probes (weak lensing and baryon acoustic oscillations). The mission will observe galaxies and clusters of galaxies out to z 2, in a wide extra-galactic survey covering 15000 deg2, plus a deep survey covering an area of 40 deg². The payload is composed of two instruments, an imager in the visible domain (VIS) and an imager-spectrometer (NISP) covering the near-infrared. The launch is planned in Q4 of 2020. The elements of the Euclid Science Ground Segment (SGS) are the Science Operations Centre (SOC) operated by ESA and nine Science Data Centres (SDCs) in charge of data processing, provided by the Euclid Consortium (EC), formed by over 110 institutes spread in 15 countries. SOC and the EC started several years ago a tight collaboration in order to design and develop a single, cost-efficient and truly integrated SGS. The distributed nature, the size of the data set, and the needed accuracy of the results are the main challenges expected in the design and implementation of the SGS. In particular, the huge volume of data (not only Euclid data but also ground based data) to be processed in the SDCs will require distributed storage to avoid data migration across SDCs. This paper describes the management challenges that the Euclid SGS is facing while dealing with such complexity. The main aspect is related to the organisation of a geographically distributed software development team. In principle algorithms and code is developed in a large number of institutes, while data is actually processed at fewer centers (the national SDCs) where the operational computational infrastructures are maintained. The software produced for data handling, processing and analysis is built within a common development environment defined by the SGS System Team, common to SOC and ECSGS, which has already been active for several years. The code is built incrementally through

  1. Integral control for population management.

    Science.gov (United States)

    Guiver, Chris; Logemann, Hartmut; Rebarber, Richard; Bill, Adam; Tenhumberg, Brigitte; Hodgson, Dave; Townley, Stuart

    2015-04-01

    We present a novel management methodology for restocking a declining population. The strategy uses integral control, a concept ubiquitous in control theory which has not been applied to population dynamics. Integral control is based on dynamic feedback-using measurements of the population to inform management strategies and is robust to model uncertainty, an important consideration for ecological models. We demonstrate from first principles why such an approach to population management is suitable via theory and examples.

  2. Integrated Information Management (IIM)

    National Research Council Canada - National Science Library

    McIlvain, Jason

    2007-01-01

    Information Technology is the core capability required to align our resources and increase our effectiveness on the battlefield by integrating and coordinating our preventative measures and responses...

  3. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  4. Integrated payload and mission planning, phase 3. Volume 3: Ground real-time mission operations

    Science.gov (United States)

    White, W. J.

    1977-01-01

    The payloads tentatively planned to fly on the first two Spacelab missions were analyzed to examine the cost relationships of providing mission operations support from onboard vs the ground-based Payload Operations Control Center (POCC). The quantitative results indicate that use of a POCC, with data processing capability, to support real-time mission operations is the most cost effective case.

  5. Integrated data management for RODOS

    International Nuclear Information System (INIS)

    Abramowicz, K.; Koschel, A.; Rafat, M.; Wendelgass, R.

    1995-12-01

    The report presents the results of a feasibility study on an integrated data organisation and management in RODOS, the real-time on-line decision support system for off-site nuclear emergency management. The conceptual design of the functional components of the integrated data management are described taking account of the software components and the operation environment of the RODOS system. In particular, the scheme architecture of a database integration manager for accessing and updating a multi-database system is discussed in detail under a variety of database management aspects. Furthermore, the structural design of both a simple knowledge database and a real-time database are described. Finally, some short comments on the benefits and disadvantages of the proposed concept of data integration in RODOS are given. (orig.) [de

  6. The mission of the well-managed community hospital.

    Science.gov (United States)

    Griffith, J R

    1988-07-01

    The well-managed community hospital as an organization is in dynamic equilibrium with its geographic community and with other communities providing finance, physicians, nurses, other professionals and resources necessary to meet local health care needs. The hospital is "well-managed" when it develops an equilibrium that permits all of its various constituencies to be satisfied. Growth in market share results from good management. The hospital's ability to attract and satisfy the needs of health care professionals while simultaneously meeting the needs of patients and their families at competitive prices allows it to flourish. Its financial success allows it to reward its medical staff and employees in ways that attract the best of each work group. A central problem in achieving good management is communication. Hospitals must communicate their goals convincingly to a large number of doctors and employees. "The Well-Managed Community Hospital," winner of the James A. Hamilton Hospital Administration Book Award, argues that a well-structured mission statement is the essential first step in the communications process. According to the book, final responsibility for the mission statement lies with the governing board and is one of five non-delegable functions of the board. The nature of the mission setting function as described in the book follows.

  7. Management and Systems Engineering of the Kepler Mission

    Science.gov (United States)

    Fanson, James; Livesay, Leslie; Frerking, Margaret; Cooke, Brian

    2010-01-01

    Kepler is the National Aeronautics and Space Administration's (NASA's) first mission capable of detecting Earth-size planets orbiting in the habitable zones around stars other than the sun. Selected for implementation in 2001 and launched in 2009, Kepler seeks to determine whether Earth-like planets are common or rare in the galaxy. The investigation requires a large, space-based photometer capable of simultaneously measuring the brightnesses of 100,000 stars at part-per-million level of precision. This paper traces the development of the mission from the perspective of project management and systems engineering and describes various methodologies and tools that were found to be effective. The experience of the Kepler development is used to illuminate lessons that can be applied to future missions.

  8. IMPaCT - Integration of Missions, Programs, and Core Technologies

    Science.gov (United States)

    Balacuit, Carlos P.; Cutts, James A.; Peterson, Craig E.; Beauchamp, Patricia M.; Jones, Susan K.; Hang, Winnie N.; Dastur, Shahin D.

    2013-01-01

    IMPaCT enables comprehensive information on current NASA missions, prospective future missions, and the technologies that NASA is investing in, or considering investing in, to be accessed from a common Web-based interface. It allows dependencies to be established between missions and technology, and from this, the benefits of investing in individual technologies can be determined. The software also allows various scenarios for future missions to be explored against resource constraints, and the nominal cost and schedule of each mission to be modified in an effort to fit within a prescribed budget.

  9. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go undetected...

  10. The Integrated Medical Model: Statistical Forecasting of Risks to Crew Health and Mission Success

    Science.gov (United States)

    Fitts, M. A.; Kerstman, E.; Butler, D. J.; Walton, M. E.; Minard, C. G.; Saile, L. G.; Toy, S.; Myers, J.

    2008-01-01

    The Integrated Medical Model (IMM) helps capture and use organizational knowledge across the space medicine, training, operations, engineering, and research domains. The IMM uses this domain knowledge in the context of a mission and crew profile to forecast crew health and mission success risks. The IMM is most helpful in comparing the risk of two or more mission profiles, not as a tool for predicting absolute risk. The process of building the IMM adheres to Probability Risk Assessment (PRA) techniques described in NASA Procedural Requirement (NPR) 8705.5, and uses current evidence-based information to establish a defensible position for making decisions that help ensure crew health and mission success. The IMM quantitatively describes the following input parameters: 1) medical conditions and likelihood, 2) mission duration, 3) vehicle environment, 4) crew attributes (e.g. age, sex), 5) crew activities (e.g. EVA's, Lunar excursions), 6) diagnosis and treatment protocols (e.g. medical equipment, consumables pharmaceuticals), and 7) Crew Medical Officer (CMO) training effectiveness. It is worth reiterating that the IMM uses the data sets above as inputs. Many other risk management efforts stop at determining only likelihood. The IMM is unique in that it models not only likelihood, but risk mitigations, as well as subsequent clinical outcomes based on those mitigations. Once the mathematical relationships among the above parameters are established, the IMM uses a Monte Carlo simulation technique (a random sampling of the inputs as described by their statistical distribution) to determine the probable outcomes. Because the IMM is a stochastic model (i.e. the input parameters are represented by various statistical distributions depending on the data type), when the mission is simulated 10-50,000 times with a given set of medical capabilities (risk mitigations), a prediction of the most probable outcomes can be generated. For each mission, the IMM tracks which conditions

  11. Adaptive and integrated water management

    NARCIS (Netherlands)

    Pahl-Wostl, C.; Kabat, P.; Möltgen, J.

    2007-01-01

    Sustainable water management is a key environmental challenge of the 21st century. Developing and implementing innovative management approaches and how to cope with the increasing complexity and uncertainties was the theme of the first International Conference on Adaptive and Integrated Water

  12. Integrated coastal management in Uruguay

    International Nuclear Information System (INIS)

    2011-01-01

    Integrated coastal management in Uruguay Carmelo includes the following areas-Nueva Palmira challenges and opportunities for local development in a context of large-scale industrial (Conchillas Uruguay), coastal management and stream Arroyo Solis Solis Chico Grande, Punta Colorada and Punta Negra, Maldonado Province Arroyo Valizas and sustainable tourism.

  13. Networking of integrated pest management

    NARCIS (Netherlands)

    Lamichhane, Jay Ram; Aubertot, Jean Noël; Begg, Graham; Birch, Andrew Nicholas E.; Boonekamp, Piet; Dachbrodt-Saaydeh, Silke; Hansen, Jens Grønbech; Hovmøller, Mogens Støvring; Jensen, Jens Erik; Jørgensen, Lise Nistrup; Kiss, Jozsef; Kudsk, Per; Moonen, Anna Camilla; Rasplus, Jean Yves; Sattin, Maurizio; Streito, Jean Claude; Messéan, Antoine

    2016-01-01

    Integrated pest management (IPM) is facing both external and internal challenges. External challenges include increasing needs to manage pests (pathogens, animal pests and weeds) due to climate change, evolution of pesticide resistance as well as virulence matching host resistance. The complexity

  14. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  15. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  16. Mission Management Computer and Sequencing Hardware for RLV-TD HEX-01 Mission

    Science.gov (United States)

    Gupta, Sukrat; Raj, Remya; Mathew, Asha Mary; Koshy, Anna Priya; Paramasivam, R.; Mookiah, T.

    2017-12-01

    Reusable Launch Vehicle-Technology Demonstrator Hypersonic Experiment (RLV-TD HEX-01) mission posed some unique challenges in the design and development of avionics hardware. This work presents the details of mission critical avionics hardware mainly Mission Management Computer (MMC) and sequencing hardware. The Navigation, Guidance and Control (NGC) chain for RLV-TD is dual redundant with cross-strapped Remote Terminals (RTs) interfaced through MIL-STD-1553B bus. MMC is Bus Controller on the 1553 bus, which does the function of GPS aided navigation, guidance, digital autopilot and sequencing for the RLV-TD launch vehicle in different periodicities (10, 20, 500 ms). Digital autopilot execution in MMC with a periodicity of 10 ms (in ascent phase) is introduced for the first time and successfully demonstrated in the flight. MMC is built around Intel i960 processor and has inbuilt fault tolerance features like ECC for memories. Fault Detection and Isolation schemes are implemented to isolate the failed MMC. The sequencing hardware comprises Stage Processing System (SPS) and Command Execution Module (CEM). SPS is `RT' on the 1553 bus which receives the sequencing and control related commands from MMCs and posts to downstream modules after proper error handling for final execution. SPS is designed as a high reliability system by incorporating various fault tolerance and fault detection features. CEM is a relay based module for sequence command execution.

  17. IAEA Mission Says France Committed to Safe, Responsible Management of Radioactive Waste

    International Nuclear Information System (INIS)

    2018-01-01

    An International Atomic Energy Agency (IAEA) team of experts said France demonstrated a comprehensive commitment to safety with a responsible approach to the management of radioactive waste and spent nuclear fuel. The team also made suggestions aimed at further enhancements and noted several good practices. The Integrated Review Service for Radioactive Waste and Spent Fuel Management, Decommissioning and Remediation (ARTEMIS) team concluded an 11-day mission to France on 24 January. The mission, requested by the Government of France, was hosted by the Directorate General of Energy and Climate (DGEC), with the participation of officials from several relevant organizations including the French National Radioactive Waste Agency (ANDRA) and the Nuclear Safety Authority (ASN), which is responsible for nuclear and radiation safety regulation in the country. ARTEMIS missions provide independent expert advice from an international team of specialists convened by the IAEA. Reviews are based on the IAEA safety standards as well as international good practices. The mission to France aimed to help the country meet European Union obligations that require an independent peer review of national programmes for the safe and responsible management of spent fuel and radioactive waste. Nuclear power currently generates more than 70 percent of France’s electricity. The country has 58 operating nuclear power reactors, which will require the continuing safe management of radioactive waste and spent fuel. France operates facilities for the disposal of very low-level and low-level wastes, and is developing a deep geological repository for the disposal of high-level waste.

  18. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  19. Integrating and Visualizing Tropical Cyclone Data Using the Real Time Mission Monitor

    Science.gov (United States)

    Goodman, H. Michael; Blakeslee, Richard; Conover, Helen; Hall, John; He, Yubin; Regner, Kathryn

    2009-01-01

    The Real Time Mission Monitor (RTMM) is a visualization and information system that fuses multiple Earth science data sources, to enable real time decision-making for airborne and ground validation experiments. Developed at the NASA Marshall Space Flight Center, RTMM is a situational awareness, decision-support system that integrates satellite imagery, radar, surface and airborne instrument data sets, model output parameters, lightning location observations, aircraft navigation data, soundings, and other applicable Earth science data sets. The integration and delivery of this information is made possible using data acquisition systems, network communication links, network server resources, and visualizations through the Google Earth virtual globe application. RTMM is extremely valuable for optimizing individual Earth science airborne field experiments. Flight planners, scientists, and managers appreciate the contributions that RTMM makes to their flight projects. A broad spectrum of interdisciplinary scientists used RTMM during field campaigns including the hurricane-focused 2006 NASA African Monsoon Multidisciplinary Analyses (NAMMA), 2007 NOAA-NASA Aerosonde Hurricane Noel flight, 2007 Tropical Composition, Cloud, and Climate Coupling (TC4), plus a soil moisture (SMAP-VEX) and two arctic research experiments (ARCTAS) in 2008. Improving and evolving RTMM is a continuous process. RTMM recently integrated the Waypoint Planning Tool, a Java-based application that enables aircraft mission scientists to easily develop a pre-mission flight plan through an interactive point-and-click interface. Individual flight legs are automatically calculated "on the fly". The resultant flight plan is then immediately posted to the Google Earth-based RTMM for interested scientists to view the planned flight track and subsequently compare it to the actual real time flight progress. We are planning additional capabilities to RTMM including collaborations with the Jet Propulsion

  20. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  1. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  2. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  3. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  4. Cryogenic Fluid Management Technology for Moon and Mars Missions

    Science.gov (United States)

    Doherty, Michael P.; Gaby, Joseph D.; Salerno, Louis J.; Sutherlin, Steven G.

    2010-01-01

    In support of the U.S. Space Exploration Policy, focused cryogenic fluid management technology efforts are underway within the National Aeronautics and Space Administration. Under the auspices of the Exploration Technology Development Program, cryogenic fluid management technology efforts are being conducted by the Cryogenic Fluid Management Project. Cryogenic Fluid Management Project objectives are to develop storage, transfer, and handling technologies for cryogens to support high performance demands of lunar, and ultimately, Mars missions in the application areas of propulsion, surface systems, and Earth-based ground operations. The targeted use of cryogens and cryogenic technologies for these application areas is anticipated to significantly reduce propellant launch mass and required on-orbit margins, to reduce and even eliminate storage tank boil-off losses for long term missions, to economize ground pad storage and transfer operations, and to expand operational and architectural operations at destination. This paper organizes Cryogenic Fluid Management Project technology efforts according to Exploration Architecture target areas, and discusses the scope of trade studies, analytical modeling, and test efforts presently underway, as well as future plans, to address those target areas. The target areas are: liquid methane/liquid oxygen for propelling the Altair Lander Ascent Stage, liquid hydrogen/liquid oxygen for propelling the Altair Lander Descent Stage and Ares V Earth Departure Stage, liquefaction, zero boil-off, and propellant scavenging for Lunar Surface Systems, cold helium and zero boil-off technologies for Earth-Based Ground Operations, and architecture definition studies for long term storage and on-orbit transfer and pressurization of LH2, cryogenic Mars landing and ascent vehicles, and cryogenic production via in situ resource utilization on Mars.

  5. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  6. Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

    Science.gov (United States)

    Sauerwein, Timothy A.; Gostomski, Thomas

    2008-01-01

    The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

  7. Church, mission and ethics. Being church with integrity | Dreyer ...

    African Journals Online (AJOL)

    This article is an exercise in Practical Ecclesiology. The author reflects on church, mission and ethics from historical, hermeneutical and strategic perspectives. Using the ecclesiology of Karl Barth as a point of departure, the author argues that the church needs to be church if it wants to be a credible witness to the Gospel of ...

  8. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  9. ASPECTS OF INTEGRATION MANAGEMENT METHODS

    Directory of Open Access Journals (Sweden)

    Artemy Varshapetian

    2015-10-01

    Full Text Available For manufacturing companies to succeed in today's unstable economic environment, it is necessary to restructure the main components of its activities: designing innovative product, production using modern reconfigurable manufacturing systems, a business model that takes into account the global strategy and management methods using modern management models and tools. The first three components are discussed in numerous publications, for example, (Koren, 2010 and is therefore not considered in the article. A large number of publications devoted to the methods and tools of production management, for example (Halevi, 2007. On the basis of what was said in the article discusses the possibility of the integration of only three methods have received in recent years, the most widely used, namely: Six Sigma method - SS (George et al., 2005 and supplements its-Design for six sigm? - DFSS (Taguchi, 2003; Lean production transformed with the development to the "Lean management" and further to the "Lean thinking" - Lean (Hirano et al., 2006; Theory of Constraints, developed E.Goldratt - TOC (Dettmer, 2001. The article investigates some aspects of this integration: applications in diverse fields, positive features, changes in management structure, etc.

  10. Integrated System Health Management (ISHM) and Autonomy

    Science.gov (United States)

    Figueroa, Fernando; Walker, Mark G.

    2018-01-01

    Systems capabilities on ISHM (Integrated System Health Management) and autonomy have traditionally been addressed separately. This means that ISHM functions, such as anomaly detection, diagnostics, prognostics, and comprehensive system awareness have not been considered traditionally in the context of autonomy functions such as planning, scheduling, and mission execution. One key reason is that although they address systems capabilities, both ISHM and autonomy have traditionally individually been approached as independent strategies and models for analysis. Additionally, to some degree, a unified paradigm for ISHM and autonomy has been difficult to implement due to limitations of hardware and software. This paper explores a unified treatment of ISHM and autonomy in the context of distributed hierarchical autonomous operations.

  11. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    International Nuclear Information System (INIS)

    CARTER, R.P.

    1999-01-01

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective

  12. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  13. Mission in the strategic territory management (on the example of the Solovetsky Archipelago

    Directory of Open Access Journals (Sweden)

    Alexander Y. Tsvetkov

    2016-06-01

    Full Text Available The article is devoted to the main aspects of the territory mission development in the context of strategic management of the territory. The paper shows the role and importance of the mission in the management of the territory and reflects the main issues and the principles of its formation. Using the example of the Solovetsky Archipelago the author analyzes the mission, gives recommendations for its improvement and provides the model of the Solovetsky archipelago mission development.

  14. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    One of the problems in the building industry is a limited degree of learning from experiences of use and operation of existing buildings. Development of professional facilities management (FM) can be seen as the missing link to bridge the gap between building operation and building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures...... on literature studies and case studies from the Nordic countries in Europe, including research reflections on experiences from a main case study, where the author, before becoming a university researcher, was engaged in the client organization as deputy project director with responsibility for the integration...

  15. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  16. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  17. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  18. Integrated Visualization Environment for Science Mission Modeling, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed work will provide NASA with an integrated visualization environment providing greater insight and a more intuitive representation of large technical...

  19. The Integrated Mode Management Interface

    Science.gov (United States)

    Hutchins, Edwin

    1996-01-01

    Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the

  20. Critical review of Ames Life Science participation in Spacelab Mission Development Test 3: The SMD 3 management study

    Science.gov (United States)

    Helmreich, R.; Wilhelm, J.; Tanner, T. A.; Sieber, J. E.; Burgenbauch, S.

    1978-01-01

    A management study was conducted to specify activities and problems encountered during the development of procedures for documentation and crew training on experiments, as well as during the design, integration, and delivery of a life sciences experiment payload to Johnson Space Center for a 7 day simulation of a Spacelab mission. Conclusions and recommendations to project management for current and future Ames' life sciences projects are included. Broader issues relevant to the conduct of future scientific missions under the constraints imposed by the environment of space are also addressed.

  1. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    SETH, S.S.

    2000-01-10

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system.

  2. Integrating Safety and Mission Assurance into Systems Engineering Modeling Practices

    Science.gov (United States)

    Beckman, Sean; Darpel, Scott

    2015-01-01

    During the early development of products, flight, or experimental hardware, emphasis is often given to the identification of technical requirements, utilizing such tools as use case and activity diagrams. Designers and project teams focus on understanding physical and performance demands and challenges. It is typically only later, during the evaluation of preliminary designs that a first pass, if performed, is made to determine the process, safety, and mission quality assurance requirements. Evaluation early in the life cycle, though, can yield requirements that force a fundamental change in design. This paper discusses an alternate paradigm for using the concepts of use case or activity diagrams to identify safety hazard and mission quality assurance risks and concerns using the same systems engineering modeling tools being used to identify technical requirements. It contains two examples of how this process might be used in the development of a space flight experiment, and the design of a Human Powered Pizza Delivery Vehicle, along with the potential benefits to decrease development time, and provide stronger budget estimates.

  3. Integrated emergency management in KKG

    International Nuclear Information System (INIS)

    Kluegel, J.U.; Plank, H.

    2007-01-01

    The development and introduction of emergency measures in Switzerland was mainly characterized by the evaluation of international experience and by systematic analysis of beyond-design basis accidents within the framework of plant-specific probabilistic safety analyses. As early as in the mid-eighties, the Swiss regulatory authority demanded that measures be taken against severe accidents, and periodically added more detailed requirements, most recently in 2000 when the introduction of Severe Accident Management Guidelines (SMAG) was demanded for power operation as well as operation in the non-power mode. The SMAG were introduced at the Goesgen nuclear power station within a project in the period between 2003 and 2005. For this purpose, a concept of integrated emergency management was developed which is based on updates of the proven emergency manual. One important aspect of this integrative concept is the distinction between preventive and mitigating procedures by defining appropriate criteria. The findings made in the implementation phase of the project include the realization that the introduction of procedures dealing with severe accidents also requires the ability to develop new ways of thinking and acting in accident management. This implies the awareness that procedures covering severe accidents must be applied much more flexibly and in the light of the situation than regulations covering fault conditions. Also possibilities to simulate severe accidents were created within the project both for the development of procedures and for training plant operators and members of the emergency staff. (orig.)

  4. Integrated Visualization Environment for Science Mission Modeling, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA is emphasizing the use of larger, more integrated models in conjunction with systems engineering tools and decision support systems. These tools place a...

  5. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  6. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  7. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  8. Distribution Integrity Management Plant (DIMP)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzales, Jerome F. [Los Alamos National Laboratory

    2012-05-07

    This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP{trademark}) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP{trademark} uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP{trademark} advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records

  9. Mission: Possible. Center of Excellence for Hazardous Materials Management

    International Nuclear Information System (INIS)

    Bartlett, W.T.; Prather-Stroud, W.

    2006-01-01

    The Center of Excellence for Hazardous Materials Management (CEHMM) was established in May 2004 as a nonprofit research organization. Its purpose is to develop a sustainable technical/scientific community located in Carlsbad, New Mexico, that interacts worldwide to find solutions to hazardous materials management issues. An important part of the mission is to achieve improved protection of worker safety, human health, and the environment. Carlsbad has a large technical community due to the presence of the Waste Isolation Pilot Plant (WIPP) and its many contractors and support organizations. These groups include the Carlsbad Environmental Monitoring and Research Center, Washington Group International, Los Alamos National Laboratory, and Sandia National Laboratories. These organizations form the basis of a unique knowledge community with strengths in many areas, such as geosciences, actinide chemistry, environmental monitoring, and waste transportation. CEHMM works cooperatively with these organizations and others to develop projects that will maintain this knowledge community beyond the projected closure date of WIPP. At present, there is an emphasis in bio-monitoring, air monitoring, hazardous materials educational programs, and endangered species remediation. CEHMM is also currently working with a group from the American Nuclear Society to help facilitate their conference scheduled for April 2006 in Carlsbad. CEHMM is growing rapidly and is looking forward to a diverse array of new projects. (authors)

  10. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  11. Planning and execution of knowledge management assist missions for nuclear organizations

    International Nuclear Information System (INIS)

    2008-05-01

    problems. The IAEA is implementing a special subprogram on Nuclear Knowledge Management with a focus on the development of guidance for KM, on networking nuclear education and training and on the preservation of nuclear knowledge. Knowledge management consists of three fundamental components: people, processes and technology. Knowledge management focuses on people and organizational culture to stimulate and nurture the sharing and use of knowledge; on processes or methods to find, create, capture and share knowledge; and on technology to store and make knowledge accessible which will allow people to work together without being located together. People are the most important component. Managing knowledge depends upon people's willingness to share and reuse knowledge. In 2005, the IAEA introduced the concept of KM missions. The missions were established to: Facilitate the transfer of pragmatic KM methodologies and tools; Assist Member States considering implementation of nuclear power programmes to integrate KM in their management system from the very beginning; Provide specific consultancy services to address emergent problems and long term issues related to KM and associated issues; Assist organizations formulate detailed requirements and action plans related to KM; Help organizations identify, by self-assessment, their own KM maturity levels against a set of pre-defined criteria. This document is written to provide a common framework for KM missions and to provide general guidance for all mission participants. This document has been prepared to provide a basic structure and common reference for KM missions. As such, it is addressed, principally, to the team members of KM missions and also to the Counterpart requesting a mission. Although not mandatory, the guidelines provided in this document should be used as the basis for all future KM missions

  12. INTEGRATED SUSTAINABLE MANGROVE FOREST MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cecep Kusmana

    2015-07-01

    Full Text Available Mangrove forest as a renewable resource must be managed based on sustainable basis in which the benefits of ecological, economic and social from the forest have to equity concern in achieving the optimum forest products and services in fulfill the needs of recent generation without destruction of future generation needs and that does not undesirable effects on the physical and social environment. This Sustainable Forest Management (SFM practices needs the supporting of sustainability in the development of social, economic and environment (ecological sounds simultaneously, it should be run by the proper institutional and regulations. In operational scale, SFM need integration in terms of knowledge, technical, consultative of stakeholders, coordination among sectors and other stakeholders, and considerations of ecological inter-relationship in which mangroves as an integral part of both a coastal ecosystem and a watershed (catchment area. Some tools have been developed to measure the performent of SFM, such as initiated by ITTO at 1992 and followed by Ministry of Forestry of Indonesia (1993, CIFOR (1995, LEI (1999, FSC (1999, etc., however, the true nuance of SFM’s performance is not easy to be measured. 

  13. Integrated Work Management: Overview, Course 31881

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-30

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

  14. IDMT, Integrated Decommissioning Management Tools

    International Nuclear Information System (INIS)

    Alemberti, A.; Castagna, P.; Marsiletti, M.; Orlandi, S.; Perasso, L.; Susco, M.

    2005-01-01

    Nuclear Power Plant decommissioning requires a number of demolition activities related to civil works and systems as well as the construction of temporary facilities used for treatment and conditioning of the dismantled parts. The presence of a radiological, potentially hazardous, environment due to the specific configuration and history of the plant require a professional, expert and qualified approach approved by the national safety authority. Dismantling activities must be designed, planned and analysed in detail during an evaluation phase taking into account different scenarios generated by possible dismantling sequences and specific waste treatments to be implemented. The optimisation process of the activities becomes very challenging taking into account the requirement of the minimisation of the radiological impact on exposed workers and people during normal and accident conditions. While remote operated equipment, waste treatment and conditioning facilities may be designed taking into account this primary goal also a centralised management system and corresponding software tools have to be designed and operated in order to guarantee the fulfilment of the imposed limits as well as the traceability of wastes. Ansaldo Nuclear Division has been strongly involved in the development of a qualified and certified software environment to manage the most critical activities of a decommissioning project. The IDMT system (Integrated Decommissioning Management Tools) provide a set of stand alone user friendly applications able to work in an integrated configuration to guarantee waste identification, traceability during treatment and conditioning process as well as location and identification at the Final Repository site. Additionally, the system can be used to identify, analyse and compare different specific operating scenarios to be optimised in term of both economical and radiological considerations. The paper provides an overview of the different phases of

  15. Pellet bed reactor for nuclear propelled vehicles: Part 2: Missions and vehicle integration trades

    International Nuclear Information System (INIS)

    Haloulakos, V.E.

    1991-01-01

    Mission and vehicle integration tradeoffs involving the use of the pellet bed reactor (PBR) for nuclear powered vehicles is discussed, with much of the information being given in viewgraph form. Information is given on propellant tank geometries, shield weight requirements for conventional tank configurations, effective specific impulse, radiation mapping, radiation dose rate after shutdown, space transfer vehicle design data, a Mars mission summary, sample pellet bed nuclear orbit transfer vehicle mass breakdown, and payload fraction vs. velocity increment

  16. Pellet bed reactor for nuclear propelled vehicles: Part 2: Missions and vehicle integration trades

    Science.gov (United States)

    Haloulakos, V. E.

    1991-01-01

    Mission and vehicle integration tradeoffs involving the use of the pellet bed reactor (PBR) for nuclear powered vehicles is discussed, with much of the information being given in viewgraph form. Information is given on propellant tank geometries, shield weight requirements for conventional tank configurations, effective specific impulse, radiation mapping, radiation dose rate after shutdown, space transfer vehicle design data, a Mars mission summary, sample pellet bed nuclear orbit transfer vehicle mass breakdown, and payload fraction vs. velocity increment.

  17. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  18. Manned Mars mission communication and data management systems

    Science.gov (United States)

    White, Ronald E.

    1986-01-01

    A manned Mars mission will involve a small crew and many complex tasks. The productivity of the crew and the entire mission will depend significantly on effective automation of these tasks and the ease with which the crew can interface with them. The technology to support a manned Mars mission is available today; however, evolving software and electronic technology are enabling many interesting possibilities for increasing productivity and safety while reducing life cycle cost. Some of these advanced technologies are identified.

  19. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  20. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  1. Integrating Mission Type Orders into Operational Level Intelligence Collection

    Science.gov (United States)

    2011-05-27

    Techniques, and Procedures U.S. United States UAS Unmanned Aircraft System UAV Unmanned Aerial Vehicle UNICORN Unified Collection Operation Reporting...MTOs. If these suggestions result in doctrinal changes, that will help grow the amount of existing literature pertaining to this topic. Existing...SIUs), Air Force ISR liaison officers (ISRLOs), and operational collection managers began maturing processes and growing techniques for employing MTOs.2

  2. Constraint and Flight Rule Management for Space Mission Operations

    Science.gov (United States)

    Barreiro, J.; Chachere, J.; Frank, J.; Bertels, C.; Crocker, A.

    2010-01-01

    The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et al, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et al., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et al, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on some of the latest research results as well as the latest challenges still facing the field.

  3. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  4. Integrated resource management of biomass

    International Nuclear Information System (INIS)

    Goodwin, E.R.

    1992-01-01

    An overview is presented of the use of biomass, with emphasis on peat, as an alternative energy source, from an integrated resource management perspective. Details are provided of the volume of the peat resource, economics of peat harvesting, and constraints to peat resource use, which mainly centre on its high water content. Use of waste heat to dry peat can increase the efficiency of peat burning for electric power generation, and new technologies such as gasification and turbo expanders may also find utilization. The burning or gasification of biomass will release no more carbon dioxide to the atmosphere than other fuels, has less sulfur content than solid fuels. The removal of peat reduces methane emissions and allows use of produced carbon dioxide for horticulture and ash for fertilizer, and creates space that may be used for forestry or agricultural biomass growth. 38 refs

  5. Integrated weed management in wheat

    International Nuclear Information System (INIS)

    Marwat, K.B.; Khan, M.A.; Nawab, K.; Khattak, A.M.

    2011-01-01

    The paper summarizes the results of an experiment conducted on wheat at Kohat, Khyber Pakhtunkhwa, Pakistan during winter 2004-05. Randomized complete block design with split-split-plot arrangement was used where wheat line and broadcast sowing were kept in main plots. Seed rates (100 and 150 kg ha-1) were assigned as sub-plots, while four herbicides (Topik, Isoproturon, Puma super and Buctril super) and weed check were assigned to sub-sub-plots. Results revealed that higher biological yield was recorded in line sowing. However, higher wheat seed rate decreased weed biomass and increased biological yield. Herbicides proved to be effective in decreasing weed biomass and enhancing grain yield and its contributing traits. It was suggested that line sowing in combination with higher seeding rate and Buctril super should be used in an integrated weed management fashion. However further studies are required to investigate various ranges of seeding rate and herbicides doses. (author)

  6. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  7. Managing the Perception of Advanced Technology Risks in Mission Proposals

    Science.gov (United States)

    Bellisario, Sebastian Nickolai

    2012-01-01

    Through my work in the project proposal office I became interested in how technology advancement efforts affect competitive mission proposals. Technology development allows for new instruments and functionality. However, including technology advancement in a mission proposal often increases perceived risk. Risk mitigation has a major impact on the overall evaluation of the proposal and whether the mission is selected. In order to evaluate the different approaches proposals took I compared the proposals claims of heritage and technology advancement to the sponsor feedback provided in the NASA debriefs. I examined a set of Discovery 2010 Mission proposals to draw patterns in how they were evaluated and come up with a set of recommendations for future mission proposals in how they should approach technology advancement to reduce the perceived risk.

  8. An integrated radar model solution for mission level performance and cost trades

    Science.gov (United States)

    Hodge, John; Duncan, Kerron; Zimmerman, Madeline; Drupp, Rob; Manno, Mike; Barrett, Donald; Smith, Amelia

    2017-05-01

    A fully integrated Mission-Level Radar model is in development as part of a multi-year effort under the Northrop Grumman Mission Systems (NGMS) sector's Model Based Engineering (MBE) initiative to digitally interconnect and unify previously separate performance and cost models. In 2016, an NGMS internal research and development (IR and D) funded multidisciplinary team integrated radio frequency (RF), power, control, size, weight, thermal, and cost models together using a commercial-off-the-shelf software, ModelCenter, for an Active Electronically Scanned Array (AESA) radar system. Each represented model was digitally connected with standard interfaces and unified to allow end-to-end mission system optimization and trade studies. The radar model was then linked to the Air Force's own mission modeling framework (AFSIM). The team first had to identify the necessary models, and with the aid of subject matter experts (SMEs) understand and document the inputs, outputs, and behaviors of the component models. This agile development process and collaboration enabled rapid integration of disparate models and the validation of their combined system performance. This MBE framework will allow NGMS to design systems more efficiently and affordably, optimize architectures, and provide increased value to the customer. The model integrates detailed component models that validate cost and performance at the physics level with high-level models that provide visualization of a platform mission. This connectivity of component to mission models allows hardware and software design solutions to be better optimized to meet mission needs, creating cost-optimal solutions for the customer, while reducing design cycle time through risk mitigation and early validation of design decisions.

  9. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  10. IVHM Framework for Intelligent Integration for Vehicle Health Management

    Science.gov (United States)

    Paris, Deidre; Trevino, Luis C.; Watson, Michael D.

    2005-01-01

    Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, is the process of assessing, preserving, and restoring system functionality across flight and techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of Integrated Intelligent Vehicle Management (IIVM). These real-time responses allow the IIVM to modify the affected vehicle subsystem(s) prior to a catastrophic event. Furthermore, this framework integrates technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear that IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission objectives. These systems include the following: Guidance and Navigation; Communications and Tracking; Vehicle Monitoring; Information Transport and Integration; Vehicle Diagnostics; Vehicle Prognostics; Vehicle Mission Planning, Automated Repair and Replacement; Vehicle Control; Human Computer Interface; and Onboard Verification and Validation. Furthermore, the presented

  11. RESOURCESAT-2: a mission for Earth resources management

    Science.gov (United States)

    Venkata Rao, M.; Gupta, J. P.; Rattan, Ram; Thyagarajan, K.

    2006-12-01

    The Indian Space Research Organisation (ISRO) has established an operational Remote sensing satellite system by launching its first satellite, IRS-1A in 1988, followed by a series of IRS spacecraft. The IRS-1C/1D satellites with their unique combination of Payloads have taken a lead position in the Global remote sensing scenario. Realising the growing User demands for the "Multi" level approach in terms of Spatial, Spectral, Temporal and Radiometric resolutions, ISRO identified the Resourcesat as a continuity as well as improved RS Satellite. The Resourcesat-1 (IRS-P6) was launched in October 2003 using PSLV launch vehicle and it is in operational service. Resourcesat-2 is its follow-on Mission scheduled for launch in 2008. Each Resourcesat satellite carries three Electro-optical cameras as its payload - LISS-3, LISS-4 and AWIFS. All the three are multi-spectral push-broom scanners with linear array CCDs as Detectors. LISS-3 and AWIFS operate in four identical spectral bands in the VIS-NIR-SWIR range while LISS-4 is a high resolution camera with three spectral bands in VIS-NIR range. In order to meet the stringent requirements of band-to-band registration and platform stability, several improvements have been incorporated in the mainframe Bus configuration like wide field Star trackers, precision Gyroscopes, on-board GPS receiver etc,. The Resourcesat data finds its application in several areas like agricultural crop discrimination and monitoring, crop acreage/yield estimation, precision farming, water resources, forest mapping, Rural infrastructure development, disaster management etc,. to name a few. A brief description of the Payload cameras, spacecraft bus elements and operational modes and few applications are presented.

  12. Scalable Integrated Multi-Mission Support System Simulator Release 3.0

    Science.gov (United States)

    Kim, John; Velamuri, Sarma; Casey, Taylor; Bemann, Travis

    2012-01-01

    The Scalable Integrated Multi-mission Support System (SIMSS) is a tool that performs a variety of test activities related to spacecraft simulations and ground segment checks. SIMSS is a distributed, component-based, plug-and-play client-server system useful for performing real-time monitoring and communications testing. SIMSS runs on one or more workstations and is designed to be user-configurable or to use predefined configurations for routine operations. SIMSS consists of more than 100 modules that can be configured to create, receive, process, and/or transmit data. The SIMSS/GMSEC innovation is intended to provide missions with a low-cost solution for implementing their ground systems, as well as significantly reducing a mission s integration time and risk.

  13. Covenant model of corporate compliance. "Corporate integrity" program meets mission, not just legal, requirements.

    Science.gov (United States)

    Tuohey, J F

    1998-01-01

    Catholic healthcare should establish comprehensive compliance strategies, beyond following Medicare reimbursement laws, that reflect mission and ethics. A covenant model of business ethics--rather than a self-interest emphasis on contracts--can help organizations develop a creed to focus on obligations and trust in their relationships. The corporate integrity program (CIP) of Mercy Health System Oklahoma promotes its mission and interests, educates and motivates its employees, provides assurance of systemwide commitment, and enforces CIP policies and procedures. Mercy's creed, based on its mission statement and core values, articulates responsibilities regarding patients and providers, business partners, society and the environment, and internal relationships. The CIP is carried out through an integrated network of committees, advocacy teams, and an expanded institutional review board. Two documents set standards for how Mercy conducts external affairs and clarify employee codes of conduct.

  14. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  15. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  16. The Western States Water Mission: A Hyper-Resolution Hydrological Model and Data Integration Platform for the Western United States

    Science.gov (United States)

    Famiglietti, J. S.; David, C. H.; Reager, J. T., II; Oaida, C.; Stampoulis, D.; Levoe, S.; Liu, P. W.; Trangsrud, A.; Basilio, R. R.; Allen, G. H.; Crichton, D. J.; Emery, C. M.; Farr, T.; Granger, S. L.; Hobbs, J.; Malhotra, S.; Osterman, G. B.; Rueckert, M.; Turmon, M.

    2017-12-01

    The Western States Water Mission (WSWM) is a high-resolution (3 km2), hydrological model and data integration platform under development at the Jet Propulsion Laboratory for the last 2 years. Distinctive features of the WSWM are its explicit representations of river networks and deep groundwater, an emphasis on uncertainty quantification, a major visualization and data distribution effort, and its focus on multivariate data assimilation, including GRACE/FO, SMAP, SWOT and MODSCAG fractional snow covered area. Importantly, the WSWM is actively managed as a flight project, i.e. with the rigor of a satellite mission. In this presentation we give an overview of the WSWM, including past accomplishments status, and future plans. In particular, results from recent 30-year simulations with GRACE and MODSCAG assimilation will be presented.

  17. Integrated management of childhood illness

    Directory of Open Access Journals (Sweden)

    1997-01-01

    Full Text Available Millones de defunciones en niños menores de 5 años se podrían prevenir en países en desarrollo si se aplicaran las medidas de control y los tratamientos eficaces que se usan normalmente en países desarrollados. Conscientes de la necesidad de hacer frente a las principales causas de enfermedad y muerte en la infancia (infecciones respiratorias agudas, enfermedades diarreicas, desnutrición, malaria y enfermedades prevenibles por medio de la vacunación mediante una iniciativa global, la OMS y el UNICEF han desarrollado una estrategia conocida por Atención Integrada de las Enfermedades Prevalentes de la Infancia (Integrated Management of Childhood Illness, IMCI. Sus oficinas regionales para las Américas, que son la OPS y el UNICEF-TACRO, han aceptado los objetivos y actividades descritos en el presente informe a fin de reorientar su labor y dirigirla hacia el mejoramiento del estado de salud infantil en este hemisferio.

  18. Integrated Vehicle Health Management (IVHM) for Aerospace Systems

    Science.gov (United States)

    Baroth, Edmund C.; Pallix, Joan

    2006-01-01

    To achieve NASA's ambitious Integrated Space Transportation Program objectives, aerospace systems will implement a variety of new concept in health management. System level integration of IVHM technologies for real-time control and system maintenance will have significant impact on system safety and lifecycle costs. IVHM technologies will enhance the safety and success of complex missions despite component failures, degraded performance, operator errors, and environment uncertainty. IVHM also has the potential to reduce, or even eliminate many of the costly inspections and operations activities required by current and future aerospace systems. This presentation will describe the array of NASA programs participating in the development of IVHM technologies for NASA missions. Future vehicle systems will use models of the system, its environment, and other intelligent agents with which they may interact. IVHM will be incorporated into future mission planners, reasoning engines, and adaptive control systems that can recommend or execute commands enabling the system to respond intelligently in real time. In the past, software errors and/or faulty sensors have been identified as significant contributors to mission failures. This presentation will also address the development and utilization of highly dependable sohare and sensor technologies, which are key components to ensure the reliability of IVHM systems.

  19. Integrated Work Management: Preparer, Course 31883

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.

  20. Joint Data Management on ICDP Projects and IODP Mission Specific Platform Expeditions

    Directory of Open Access Journals (Sweden)

    Frank Krysiak

    2007-03-01

    Full Text Available Data management in the Integrated Ocean Drilling Program (IODP and the International Continental Scientific Drilling Program (ICDP supports two functions: firstly, the capture of drilling and scientific data and secondly, the longterm storage and dissemination of these data. The data capture in both ICDP projects and IODP-Mission Specific Platform (MSP expeditions takes place in two phases. During the drilling phase, drilling, curation, logging, andbasic scientific data are captured at the drill site. In the postdrilling phase the detailed measurements, descriptions, images and log data for the split cores are captured within a laboratory setting and the data subsequently transferred to the long-term data storage system. Here we show how a flexible and modular designed information system has been developed over the course of continental and ocean drilling projects.

  1. The SMART Theory and Modeling Team: An Integrated Element of Mission Development and Science Analysis

    Science.gov (United States)

    Hesse, Michael; Birn, J.; Denton, Richard E.; Drake, J.; Gombosi, T.; Hoshino, M.; Matthaeus, B.; Sibeck, D.

    2005-01-01

    When targeting physical understanding of space plasmas, our focus is gradually shifting away from discovery-type investigations to missions and studies that address our basic understanding of processes we know to be important. For these studies, theory and models provide physical predictions that need to be verified or falsified by empirical evidence. Within this paradigm, a tight integration between theory, modeling, and space flight mission design and execution is essential. NASA's Magnetospheric MultiScale (MMS) mission is a pathfinder in this new era of space research. The prime objective of MMS is to understand magnetic reconnection, arguably the most fundamental of plasma processes. In particular, MMS targets the microphysical processes, which permit magnetic reconnection to operate in the collisionless plasmas that permeate space and astrophysical systems. More specifically, MMS will provide closure to such elemental questions as how particles become demagnetized in the reconnection diffusion region, which effects determine the reconnection rate, and how reconnection is coupled to environmental conditions such as magnetic shear angles. Solutions to these problems have remained elusive in past and present spacecraft missions primarily due to instrumental limitations - yet they are fundamental to the large-scale dynamics of collisionless plasmas. Owing to the lack of measurements, most of our present knowledge of these processes is based on results from modern theory and modeling studies of the reconnection process. Proper design and execution of a mission targeting magnetic reconnection should include this knowledge and have to ensure that all relevant scales and effects can be resolved by mission measurements. The SMART mission has responded to this need through a tight integration between instrument and theory and modeling teams. Input from theory and modeling is fed into all aspects of science mission design, and theory and modeling activities are tailored

  2. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  3. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  4. ENTREPRENEURIAL UNIVERSITY: DEVELOPING AND INTEGRATING THE THIRD MISSION IN HIGHER EDUCATION INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Mihaela, DIACONU

    2014-11-01

    Full Text Available The modern unversity which activates in a highly competitive market and is mostly assisted and not financially supported by the state must find tools with which to be competitive and prestigious. It is necessary to identify the managerial and scientific opportunities with which to build the best resources in order to fulfill its mission. This study presents the role of the university in the economic and social environment supported by the mission undertaken by three components: teaching, scientific research and the social function and to what extent the third mission of the modern university is seen as a necessity in the context of current economic and social context by the universities of Romania. The method used was the content analysis of the mission of universities in Romania presented in the University Charter and its correlation with the analysis models on entrepreneurship and academic entrepreneurial management offered by the specialized literature. The conclusion is that more than 60% of universities in Romania formulated their mission by considering the three components and that understanding and building entrepreneurial culture is a condition of the successful fulfillment of the mission of the modern university.

  5. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  6. Third Mission Activities: University Managers' Perceptions on Existing Barriers

    Science.gov (United States)

    Koryakina, Tatyana; Sarrico, Cláudia S.; Teixeira, Pedro N.

    2015-01-01

    In the context of increased international competition and financial austerity, an economic development mission has become an important strategic and policy issue for European higher education. This paper aims to contribute to knowledge regarding universities' engagement with the external environment and its impact on internal governance and…

  7. Integrated management of waterbirds: Beyond the conventional

    Science.gov (United States)

    Erwin, R.M.; Parsons, Katharine C.; Brown, Stephen C.; Erwin, R. Michael; Czech, Helen A.; Coulson, John C.

    2002-01-01

    Integrated waterbird management over the past few decades has implicitly referred to methods for managing wetlands that usually attempt to enhance habitat for taxonomic groups such as shorebirds and wading birds, in addition to waterfowl, the traditional focus group. Here I describe five elements of integration in management: taxonomic, spatial, temporal, population and habitat, and multiple-use management objectives. Spatial integration simply expands the scale of management concern. Rather than emphasizing management on a very limited number of impoundments or wetlands in small refuges or wildlife management areas, the vision is beginning to shift to connectivity within larger landscapes on the order of many square kilometers as telemetry data on daily and seasonal movements for many species become available. Temporal integration refers to the potential for either simultaneous management for waterbirds and commercial 'crops' (e.g., crayfish and rice) or for temporally-staggered management such as row crop production in spring-summer growing seasons and waterbird management on fallow fields in the non-growing (winter) season. Integrating population dynamics with habitats has become a major research focus over the past decade. Identifying which wetlands are ?sources? or ?sinks? for specific populations provides managers with critical information about effective management. Further, the applications of spatially explicit population models place heavy demands on researchers to identify use patterns for breeding and dispersing individuals by age, sex, and reproductive class. Population viability analysis models require much the same information. Finally, multiple-use management integration refers to trying to optimize the uses of wetlands, when only one (perhaps secondary) use may include waterbird management. Depending upon the ownership and primary land use of a particular parcel of land containing wetlands and/or water bodies, managing for waterbirds may be an

  8. Export channel pricing management for integrated solutions

    OpenAIRE

    Roine, Henna; Sainio, Liisa-Maija; Saarenketo, Sami

    2012-01-01

    This article studies systems integrators' export channel pricing management for integrated solutions. We find support from our empirical case study for the notion that a systems integrator's export channel pricing strategy is multidimensional and dependent on international pricing environment and partner characteristics and that export partnerships have unique implications on a systems integrator's pricing process. The results show that giving up pricing control in export channel context may ...

  9. Integrated solid waste management in Germany

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report covers Germany`s experience with integrated solid waste management programs. The municipal solid waste practices of four cities include practices and procedures that waste facility managers with local or state governments may consider for managing their own day-to-day operations.

  10. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  11. Integration of CubeSat Systems with Europa Surface Exploration Missions

    Science.gov (United States)

    Erdoǧan, Enes; Inalhan, Gokhan; Kemal Üre, Nazım

    2016-07-01

    Recent studies show that there is a high probability that a liquid ocean exists under thick icy surface of Jupiter's Moon Europa. The findings also show that Europa has features that are similar to Earth, such as geological activities. As a result of these studies, Europa has promising environment of being habitable and currently there are many missions in both planning and execution level that target Europa. However, these missions usually involve extremely high budgets over extended periods of time. The objective of this talk is to argue that the mission costs can be reduced significantly by integrating CubeSat systems within Europa exploration missions. In particular, we introduce an integrated CubeSat-micro probe system, which can be used for measuring the size and depth of the hypothetical liquid ocean under the icy surface of Europa. The systems consist of an entry module that houses a CubeSat combined with driller measurement probes. Driller measurement probes deploy before the system hits the surface and penetrate the surface layers of Europa. Moreover, a micro laser probe could be used to examine the layers. This process enables investigation of the properties of the icy layer and the environment beneath the surface. Through examination of different scenarios and cost analysis of the components, we show that the proposed CubeSat systems has a significant potential to reduce the cost of the overall mission. Both subsystem requirements and launch prices of CubeSats are dramatically cheaper than currently used satellites. In addition, multiple CubeSats may be used to dominate wider area in space and they are expandable in face of potential failures. In this talk we discuss both the mission design and cost reduction aspects.

  12. Results from the NASA Spacecraft Fault Management Workshop: Cost Drivers for Deep Space Missions

    Science.gov (United States)

    Newhouse, Marilyn E.; McDougal, John; Barley, Bryan; Stephens Karen; Fesq, Lorraine M.

    2010-01-01

    Fault Management, the detection of and response to in-flight anomalies, is a critical aspect of deep-space missions. Fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for five missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that four out of the five missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, and academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the

  13. Integrated Regulatory Review Service (IRRS) Guidelines for the Preparation and Conduct of IRRS Missions

    International Nuclear Information System (INIS)

    2013-01-01

    The IAEA Integrated Regulatory Review Service (IRRS) was established to strengthen and enhance the effectiveness of national regulatory infrastructure for nuclear safety, radiation safety, radioactive waste and transport safety, and the security of radioactive sources, while recognizing the ultimate responsibility of each Member State to ensure safety in these areas. The IRRS process sets out to accomplish this expressed purpose through consideration of both technical and policy issues of a regulatory nature against IAEA safety standards and, where appropriate, good practice elsewhere. The regulatory review process directly draws upon the wide-ranging international experience and expertise of IRRS review team members. Peer exchange on technical and policy issues gives insight into the efficiency and effectiveness of the legal and governmental framework and regulatory infrastructure for safety. Through this process, opportunities for improvement are explored and potential improvement strategies identified which may be shared with other States. IRRS missions provide an opportunity for sharing regulatory experiences, harmonizing regulatory approaches among States, and creating mutual learning opportunities among regulators. IRRS discussions focus on issues arising from the State's self-assessment and the evaluation of technical areas and policy issues. The IAEA Fundamental Safety Principles (IAEA Safety Standards Series No. SF-1) provide the basis for IAEA safety standards and IAEA safety related programmes. In support of effective regulation, the IAEA has established safety standards in the area of the Governmental, Legal and Regulatory Framework for Safety (IAEA Safety Standards Series No. GSR Part 1). These safety standards form a core component of an IRRS review. Other requirements and guidance, such as The Management System for Facilities and Activities (IAEA Safety Standards Series No. GS-R-3) and Radiation Protection and Safety of Radiation Sources

  14. Using Natural Language to Enable Mission Managers to Control Multiple Heterogeneous UAVs

    Science.gov (United States)

    Trujillo, Anna C.; Puig-Navarro, Javier; Mehdi, S. Bilal; Mcquarry, A. Kyle

    2016-01-01

    The availability of highly capable, yet relatively cheap, unmanned aerial vehicles (UAVs) is opening up new areas of use for hobbyists and for commercial activities. This research is developing methods beyond classical control-stick pilot inputs, to allow operators to manage complex missions without in-depth vehicle expertise. These missions may entail several heterogeneous UAVs flying coordinated patterns or flying multiple trajectories deconflicted in time or space to predefined locations. This paper describes the functionality and preliminary usability measures of an interface that allows an operator to define a mission using speech inputs. With a defined and simple vocabulary, operators can input the vast majority of mission parameters using simple, intuitive voice commands. Although the operator interface is simple, it is based upon autonomous algorithms that allow the mission to proceed with minimal input from the operator. This paper also describes these underlying algorithms that allow an operator to manage several UAVs.

  15. Integrated Work Management: PIC, Course 31884

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-08

    The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

  16. The Integrated Medical Model: A Risk Assessment and Decision Support Tool for Human Space Flight Missions

    Science.gov (United States)

    Kerstman, Eric L.; Minard, Charles; FreiredeCarvalho, Mary H.; Walton, Marlei E.; Myers, Jerry G., Jr.; Saile, Lynn G.; Lopez, Vilma; Butler, Douglas J.; Johnson-Throop, Kathy A.

    2011-01-01

    This slide presentation reviews the Integrated Medical Model (IMM) and its use as a risk assessment and decision support tool for human space flight missions. The IMM is an integrated, quantified, evidence-based decision support tool useful to NASA crew health and mission planners. It is intended to assist in optimizing crew health, safety and mission success within the constraints of the space flight environment for in-flight operations. It uses ISS data to assist in planning for the Exploration Program and it is not intended to assist in post flight research. The IMM was used to update Probability Risk Assessment (PRA) for the purpose of updating forecasts for the conditions requiring evacuation (EVAC) or Loss of Crew Life (LOC) for the ISS. The IMM validation approach includes comparison with actual events and involves both qualitative and quantitaive approaches. The results of these comparisons are reviewed. Another use of the IMM is to optimize the medical kits taking into consideration the specific mission and the crew profile. An example of the use of the IMM to optimize the medical kits is reviewed.

  17. A Framework for Integration of IVHM Technologies for Intelligent Integration for Vehicle Management

    Science.gov (United States)

    Paris, Deidre E.; Trevino, Luis; Watson, Mike

    2005-01-01

    As a part of the overall goal of developing Integrated Vehicle Health Management (IVHM) systems for aerospace vehicles, the NASA Faculty Fellowship Program (NFFP) at Marshall Space Flight Center has performed a pilot study on IVHM principals which integrates researched IVHM technologies in support of Integrated Intelligent Vehicle Management (IIVM). IVHM is the process of assessing, preserving, and restoring system functionality across flight and ground systems (NASA NGLT 2004). The framework presented in this paper integrates advanced computational techniques with sensor and communication technologies for spacecraft that can generate responses through detection, diagnosis, reasoning, and adapt to system faults in support of IIVM. These real-time responses allow the IIVM to modify the effected vehicle subsystem(s) prior to a catastrophic event. Furthermore, the objective of this pilot program is to develop and integrate technologies which can provide a continuous, intelligent, and adaptive health state of a vehicle and use this information to improve safety and reduce costs of operations. Recent investments in avionics, health management, and controls have been directed towards IIVM. As this concept has matured, it has become clear the IIVM requires the same sensors and processing capabilities as the real-time avionics functions to support diagnosis of subsystem problems. New sensors have been proposed, in addition, to augment the avionics sensors to support better system monitoring and diagnostics. As the designs have been considered, a synergy has been realized where the real-time avionics can utilize sensors proposed for diagnostics and prognostics to make better real-time decisions in response to detected failures. IIVM provides for a single system allowing modularity of functions and hardware across the vehicle. The framework that supports IIVM consists of 11 major on-board functions necessary to fully manage a space vehicle maintaining crew safety and mission

  18. Transaction management with integrity checking

    DEFF Research Database (Denmark)

    Martinenghi, Davide; Christiansen, Henning

    2005-01-01

    Database integrity constraints, understood as logical conditions that must hold for any database state, are not fully supported by current database technology. It is typically up to the database designer and application programmer to enforce integrity via triggers or tests at the application level....... 2.~In concurrent database systems, besides the traditional correctness criterion, the execution schedule must ensure that the different transactions can overlap in time without destroying the consistency requirements tested by other, concurrent transactions....

  19. Global challenges in integrated coastal zone management

    DEFF Research Database (Denmark)

    integration of data and information in policy and management, combining expertise from nature and social science, to reach a balanced and sustainable development of the coastal zone. This important book comprises the proceedings of The International Symposium on Integrated Coastal Zone Management, which took....../mitigation to change in coastal systems Coastal governance Linking science and management Comprising a huge wealth of information, this timely and well-edited volume is essential reading for all those involved in coastal zone management around the globe. All libraries in research establishments and universities where...

  20. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 and 2

    International Nuclear Information System (INIS)

    SETH, S.S.

    2000-01-01

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system

  1. Integrating Records Management (RM) and Information Technology (IT)

    Energy Technology Data Exchange (ETDEWEB)

    NUSBAUM,ANNA W.; CUSIMANO,LINDA J.

    2000-03-02

    Records Managers are continually exploring ways to integrate their services with those offered by Information Technology-related professions to capitalize on the advantages of providing customers a total solution to managing their records and information. In this day and age, where technology abounds, there often exists a fear on the part of records management that this integration will result in a loss of identity and the focus of one's own mission - a fear that records management may become subordinated to the fast-paced technology fields. They need to remember there is strength in numbers and it benefits RM, IT, and the customer when they can bring together the unique offerings each possess to reach synergy for the benefit of all the corporations. Records Managers, need to continually strive to move ''outside the records management box'', network, expand their knowledge, and influence the IT disciplines to incorporate the concept of ''management'' into their customer solutions.

  2. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  3. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    intern

    implementation of health facility based Integrated Management of Childhood Illness ... community-owned resource persons (CORPs) to provide health education to care ... differing coverage of basic essential services such safe water supply, ...

  4. AN ASSESSMENT OF THE INTEGRATED PEST MANAGEMENT ...

    African Journals Online (AJOL)

    Integrated Pest Management Collaborative Research Support Program) has been applying a farmer participatory IPM strategy at on-farm research sites in eastern Uganda since 1995. Following five years of project implementation an evaluation ...

  5. Integrated Data for Improved Asset Management

    Science.gov (United States)

    2016-05-26

    The objective of this research is to demonstrate the potential benefits for agency-wide data integration for VDOT asset management. This objective is achieved through an example application that requires information distributed across multiple databa...

  6. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  7. Integrated Solution Support System for Water Management

    NARCIS (Netherlands)

    Kassahun, A.; Blind, M.; Krause, A.U.M.; Roosenschoon, O.R.

    2008-01-01

    Solving water management problems involves technical, social, economic, political and legal challenges and thus requires an integrated approach involving people from different backgrounds and roles. The integrated approach has been given a prominent role within the European Union¿s Water Framework

  8. Integrating Sustainable Development into Operations Management Courses

    Science.gov (United States)

    Fredriksson, Peter; Persson, Magnus

    2011-01-01

    Purpose: It is widely acknowledged that aspects of sustainable development (SD) should be integrated into higher level operations management (OM) education. The aim of the paper is to outline the experiences gained at Chalmers University of Technology in Sweden from integrating aspects of SD into OM courses. Design/methodology/approach: The paper…

  9. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  10. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  11. Behavioral and biological effects of autonomous versus scheduled mission management in simulated space-dwelling groups

    Science.gov (United States)

    Roma, Peter G.; Hursh, Steven R.; Hienz, Robert D.; Emurian, Henry H.; Gasior, Eric D.; Brinson, Zabecca S.; Brady, Joseph V.

    2011-05-01

    Logistical constraints during long-duration space expeditions will limit the ability of Earth-based mission control personnel to manage their astronaut crews and will thus increase the prevalence of autonomous operations. Despite this inevitability, little research exists regarding crew performance and psychosocial adaptation under such autonomous conditions. To this end, a newly-initiated study on crew management systems was conducted to assess crew performance effectiveness under rigid schedule-based management of crew activities by Mission Control versus more flexible, autonomous management of activities by the crews themselves. Nine volunteers formed three long-term crews and were extensively trained in a simulated planetary geological exploration task over the course of several months. Each crew then embarked on two separate 3-4 h missions in a counterbalanced sequence: Scheduled, in which the crews were directed by Mission Control according to a strict topographic and temporal region-searching sequence, and Autonomous, in which the well-trained crews received equivalent baseline support from Mission Control but were free to explore the planetary surface as they saw fit. Under the autonomous missions, performance in all three crews improved (more high-valued geologic samples were retrieved), subjective self-reports of negative emotional states decreased, unstructured debriefing logs contained fewer references to negative emotions and greater use of socially-referent language, and salivary cortisol output across the missions was attenuated. The present study provides evidence that crew autonomy may improve performance and help sustain if not enhance psychosocial adaptation and biobehavioral health. These controlled experimental data contribute to an emerging empirical database on crew autonomy which the international astronautics community may build upon for future research and ultimately draw upon when designing and managing missions.

  12. Minimal support technology and in situ resource utilization for risk management of planetary spaceflight missions

    Science.gov (United States)

    Murphy, K. L.; Rygalov, V. Ye.; Johnson, S. B.

    2009-04-01

    All artificial systems and components in space degrade at higher rates than on Earth, depending in part on environmental conditions, design approach, assembly technologies, and the materials used. This degradation involves not only the hardware and software systems but the humans that interact with those systems. All technological functions and systems can be expressed through functional dependence: [Function]˜[ERU]∗[RUIS]∗[ISR]/[DR];where [ERU]efficiency (rate) of environmental resource utilization[RUIS]resource utilization infrastructure[ISR]in situ resources[DR]degradation rateThe limited resources of spaceflight and open space for autonomous missions require a high reliability (maximum possible, approaching 100%) for system functioning and operation, and must minimize the rate of any system degradation. To date, only a continuous human presence with a system in the spaceflight environment can absolutely mitigate those degradations. This mitigation is based on environmental amelioration for both the technology systems, as repair of data and spare parts, and the humans, as exercise and psychological support. Such maintenance now requires huge infrastructures, including research and development complexes and management agencies, which currently cannot move beyond the Earth. When considering what is required to move manned spaceflight from near Earth stations to remote locations such as Mars, what are the minimal technologies and infrastructures necessary for autonomous restoration of a degrading system in space? In all of the known system factors of a mission to Mars that reduce the mass load, increase the reliability, and reduce the mission’s overall risk, the current common denominator is the use of undeveloped or untested technologies. None of the technologies required to significantly reduce the risk for critical systems are currently available at acceptable readiness levels. Long term interplanetary missions require that space programs produce a craft

  13. Advancing mission in the marketplace. Integrated strategic planning and budgeting helps a system remain accountable.

    Science.gov (United States)

    Smessaert, A H

    1992-10-01

    In the late 1980s Holy Cross Health System (HCHS), South Bend, IN, began to implement a revised strategic planning and budgeting process to effectively link the system's mission with its day-to-day operations. Leaders wanted a process that would help system employees internalize and act on the four major elements articulated in the HCHS mission statement: fidelity, excellence, empowerment, and stewardship. Representatives from mission, strategic planning, and finance from the corporate office and subsidiaries examined planning and budgeting methods. From the beginning, HCHS leaders decided that the process should be implemented gradually, with each step focusing on refining methodology and improving mission integration. As the process evolved. HCHS developed a sequence in which planning preceded budgeting. The system also developed a variety of educational and collaborative initiatives to help system employees adapt to the organization's change of direction. One critical aspect of HCHS's ongoing education is an ethical reflection process that helps participants balance ethical considerations by viewing an issue from three perspectives: social vision, multiple responsibility, and self-interest.

  14. Partnering and integrated supply management

    DEFF Research Database (Denmark)

    Bjarnø, Ole-Christian; Olsen, Anders; Thyssen, Mikael

    2003-01-01

    for strategic management of collaborative relationships on a line with the purchasing perspectives offered by Supply Chain Management. Based on a study of the literature and an in-depth case study carried out within a large Scandinavian contractor, this article gives a proposal for how Partnering can...... be supported by strategic purchasing, with the aim of achieving strategic Partnering. The contribution of this article is thus the development of a new purchasing perspective within Construction Supply Chain Management.......Developments in the construction industry, with a lack of productivity increases compared to manufacturing industry in general, have amongst other things led to the use of Partnering, which is a form of collaboration which attempts to counteract the distrust and the sub-optimisation which...

  15. Managing harvest and habitat as integrated components

    Science.gov (United States)

    Osnas, Erik; Runge, Michael C.; Mattsson, Brady J.; Austin, Jane E.; Boomer, G. S.; Clark, R. G.; Devers, P.; Eadie, J. M.; Lonsdorf, E. V.; Tavernia, Brian G.

    2014-01-01

    In 2007, several important initiatives in the North American waterfowl management community called for an integrated approach to habitat and harvest management. The essence of the call for integration is that harvest and habitat management affect the same resources, yet exist as separate endeavours with very different regulatory contexts. A common modelling framework could help these management streams to better understand their mutual effects. Particularly, how does successful habitat management increase harvest potential? Also, how do regional habitat programmes and large-scale harvest strategies affect continental population sizes (a metric used to express habitat goals)? In the ensuing five years, several projects took on different aspects of these challenges. While all of these projects are still on-going, and are not yet sufficiently developed to produce guidance for management decisions, they have been influential in expanding the dialogue and producing some important emerging lessons. The first lesson has been that one of the more difficult aspects of integration is not the integration across decision contexts, but the integration across spatial and temporal scales. Habitat management occurs at local and regional scales. Harvest management decisions are made at a continental scale. How do these actions, taken at different scales, combine to influence waterfowl population dynamics at all scales? The second lesson has been that consideration of the interface of habitat and harvest management can generate important insights into the objectives underlying the decision context. Often the objectives are very complex and trade-off against one another. The third lesson follows from the second – if an understanding of the fundamental objectives is paramount, there is no escaping the need for a better understanding of human dimensions, specifically the desires of hunters and nonhunters and the role they play in conservation. In the end, the compelling question is

  16. Real-Time Risk and Fault Management in the Mission Evaluation Room for the International Space Station

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, W.R.; Novack, S.D.

    2003-05-30

    Effective anomaly resolution in the Mission Evaluation Room (MER) of the International Space Station (ISS) requires consideration of risk in the process of identifying faults and developing corrective actions. Risk models such as fault trees from the ISS Probabilistic Risk Assessment (PRA) can be used to support anomaly resolution, but the functionality required goes significantly beyond what the PRA could provide. Methods and tools are needed that can systematically guide the identification of root causes for on-orbit anomalies, and to develop effective corrective actions that address the event and its consequences without undue risk to the crew or the mission. In addition, an overall information management framework is needed so that risk can be systematically incorporated in the process, and effectively communicated across all the disciplines and levels of management within the space station program. The commercial nuclear power industry developed such a decision making framework, known as the critical safety function approach, to guide emergency response following the accident at Three Mile Island in 1979. This report identifies new methods, tools, and decision processes that can be used to enhance anomaly resolution in the ISS Mission Evaluation Room. Current anomaly resolution processes were reviewed to identify requirements for effective real-time risk and fault management. Experience gained in other domains, especially the commercial nuclear power industry, was reviewed to identify applicable methods and tools. Recommendations were developed for next-generation tools to support MER anomaly resolution, and a plan for implementing the recommendations was formulated. The foundation of the proposed tool set will be a ''Mission Success Framework'' designed to integrate and guide the anomaly resolution process, and to facilitate consistent communication across disciplines while focusing on the overriding importance of mission success.

  17. Real-Time Risk and Fault Management in the Mission Evaluation Room of the International Space Station

    Energy Technology Data Exchange (ETDEWEB)

    William R. Nelson; Steven D. Novack

    2003-05-01

    Effective anomaly resolution in the Mission Evaluation Room (MER) of the International Space Station (ISS) requires consideration of risk in the process of identifying faults and developing corrective actions. Risk models such as fault trees from the ISS Probablistic Risk Assessment (PRA) can be used to support anomaly resolution, but the functionality required goes significantly beyond what the PRA could provide. Methods and tools are needed that can systematically guide the identification of root causes for on-orbit anomalies, and to develop effective corrective actions that address the event and its consequences without undue risk to the crew or the mission. In addition, an overall information management framework is needed so that risk can be systematically incorporated in the process, and effectively communicated across all the disciplines and levels of management within the space station program. The commercial nuclear power industry developed such a decision making framework, known as the critical safety function approach, to guide emergency response following the accident at Three Mile Island in 1979. This report identifies new methods, tools, and decision processes that can be used to enhance anomaly resolution in the ISS Mission Evaluation Room. Current anomaly resolution processes were reviewed to identify requirements for effective real-time risk and fault management. Experience gained in other domains, especially the commercial nuclear power industry, was reviewed to identify applicable methods and tools. Recommendations were developed for next-generation tools to support MER anomaly resolution, and a plan for implementing the recommendations was formulated. The foundation of the proposed toolset will be a "Mission Success Framework" designed to integrate and guide the anomaly resolution process, and to facilitate consistent communication across disciplines while focusing on the overriding importance of mission success.

  18. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  19. Integrated pest management - an overview and update

    Science.gov (United States)

    Thomas D. Landis; R. Kasten Dumroese

    2014-01-01

    Integrated pest management, better known as IPM, is a familiar term for those of us working in forest, conservation, and native plant nurseries. An almost synonymous concept is "holistic pest management" that has been the topic of chapters in recent Agriculture Handbooks that would be useful to growers of native plants (see Landis and others 2009; Landis and...

  20. Integration of operational research and environmental management

    NARCIS (Netherlands)

    Bloemhof - Ruwaard, J.M.

    1996-01-01


    The subject of this thesis is the integration of Operational Research and Environmental Management. Both sciences play an important role in the research of environmental issues. Part I describes a framework for the interactions between Operational Research and Environmental Management.

  1. Integrated Approach to User Account Management

    Science.gov (United States)

    Kesselman, Glenn; Smith, William

    2007-01-01

    IT environments consist of both Windows and other platforms. Providing user account management for this model has become increasingly diffi cult. If Microsoft#s Active Directory could be enhanced to extend a W indows identity for authentication services for Unix, Linux, Java and Macintosh systems, then an integrated approach to user account manag ement could be realized.

  2. Planning and Execution of Knowledge Management Assist Missions for Nuclear Organizations (Russian Edition)

    International Nuclear Information System (INIS)

    2012-06-01

    As a result of the widening knowledge gap in the nuclear industry and related organizations, the IAEA is developing a series of guidance documents on knowledge management. This publication represents one such activity and provides general guidance as to the nature of the knowledge management mission and the means by which its goals are to be achieved and executed.

  3. An Integrated Vision-Based System for Spacecraft Attitude and Topology Determination for Formation Flight Missions

    Science.gov (United States)

    Rogers, Aaron; Anderson, Kalle; Mracek, Anna; Zenick, Ray

    2004-01-01

    With the space industry's increasing focus upon multi-spacecraft formation flight missions, the ability to precisely determine system topology and the orientation of member spacecraft relative to both inertial space and each other is becoming a critical design requirement. Topology determination in satellite systems has traditionally made use of GPS or ground uplink position data for low Earth orbits, or, alternatively, inter-satellite ranging between all formation pairs. While these techniques work, they are not ideal for extension to interplanetary missions or to large fleets of decentralized, mixed-function spacecraft. The Vision-Based Attitude and Formation Determination System (VBAFDS) represents a novel solution to both the navigation and topology determination problems with an integrated approach that combines a miniature star tracker with a suite of robust processing algorithms. By combining a single range measurement with vision data to resolve complete system topology, the VBAFDS design represents a simple, resource-efficient solution that is not constrained to certain Earth orbits or formation geometries. In this paper, analysis and design of the VBAFDS integrated guidance, navigation and control (GN&C) technology will be discussed, including hardware requirements, algorithm development, and simulation results in the context of potential mission applications.

  4. Advanced Fuel Cell System Thermal Management for NASA Exploration Missions

    Science.gov (United States)

    Burke, Kenneth A.

    2009-01-01

    The NASA Glenn Research Center is developing advanced passive thermal management technology to reduce the mass and improve the reliability of space fuel cell systems for the NASA exploration program. An analysis of a state-of-the-art fuel cell cooling systems was done to benchmark the portion of a fuel cell system s mass that is dedicated to thermal management. Additional analysis was done to determine the key performance targets of the advanced passive thermal management technology that would substantially reduce fuel cell system mass.

  5. Why Training for Service Contract Management is Mission Essential

    National Research Council Canada - National Science Library

    Friar, Allen

    2005-01-01

    ... Programs provide vital services and act as force multipliers for forward deployment units. Consequently, a transformation in contracting and acquisition leadership along with proper planning is necessary to manage contracts...

  6. The IAEA Integrated Regulatory Review Service Mission to Sweden in February 2012

    International Nuclear Information System (INIS)

    2012-01-01

    The Swedish Government decided on January 22, 2009 to mandate the Swedish Radiation Safety Authority, SSM, to apply for an international review of the Authority and its areas of supervision, an 'IRRS' (Integrated Regulatory Review Service) carried out by the International Atomic Energy Agency (IAEA). On February 25, 2009, SSM made a formal request to the IAEA for an IRRS in Sweden. The time period for the IRRS mission was later agreed to be 6-17 February, 2012. This report summarises the project's progress immediately prior to the IRRS mission in February 2012. The report contains the findings from the self assessment performed by SSM staff. It also contains a plan to implement measures to remedy deficiencies that have been identified and to improve the radiation safety work of the Authority

  7. Implementing Integrated River Basin Management in China

    Directory of Open Access Journals (Sweden)

    Dorri G. J. te Boekhorst

    2010-06-01

    Full Text Available This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are matched with the advice of the China Council for International Cooperation on Environment and Development task force on integrated river basin management to the national government of China. This article demonstrates that the World Wildlife Fund for Nature uses various strategies of different types to support a transition process towards integrated river basin management. Successful deployment of these strategies for change in environmental policy requires special skills, actions, and attitudes on the part of the policy entrepreneur, especially in China, where the government has a dominant role regarding water management and the position of policy entrepeneurs is delicate.

  8. PENATAAN RUANG LAUT BERDASARKAN INTEGRATED COASTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dina Sunyowati

    2008-10-01

    Full Text Available The planning of coastal spatial arrangement must be put in the valid spatial planning system. Law Number 26 of 2007 on Spatial Planning and it is in fact related with land spatial planning, although that ocean and air spatial management will be arranged in separate law. The legal for coastal zone management is determined by using the principles of integrated coastal management by focusing on area or zone authority system. The integrated of coastal zones management regulations should be followed by the planning of coastal spatial arrange­ment. Therefore, certain synchronization at coastal zones governance is very important issue since by integrating and coordinating other related regulations and therefore conflict of norm can be minimized in the spatial planning coastal zone.

  9. Integrated therapy safety management system

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-01-01

    Aims The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an ‘integrated therapy safety management’ is drafted. This concept could serve as a basis to improve resilience. Methods The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for ‘integrated therapy safety management’. The concept is applied by way of example for the ‘medication process’ to demonstrate its practical implementation. Results The ‘integrated therapy safety management’ is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of ‘bridge managers’. ‘Bridge managers’ anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the ‘bridge managers’ and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. Conclusions The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. PMID:24007448

  10. Quantitative Validation of the Integrated Medical Model (IMM) for ISS Missions

    Science.gov (United States)

    Young, Millennia; Arellano, J.; Boley, L.; Garcia, Y.; Saile, L.; Walton, M.; Kerstman, E.; Reyes, D.; Goodenow, D. A.; Myers, J. G.

    2016-01-01

    Lifetime Surveillance of Astronaut Health (LSAH) provided observed medical event data on 33 ISS and 111 STS person-missions for use in further improving and validating the Integrated Medical Model (IMM). Using only the crew characteristics from these observed missions, the newest development version, IMM v4.0, will simulate these missions to predict medical events and outcomes. Comparing IMM predictions to the actual observed medical event counts will provide external validation and identify areas of possible improvement. In an effort to improve the power of detecting differences in this validation study, the total over each program ISS and STS will serve as the main quantitative comparison objective, specifically the following parameters: total medical events (TME), probability of loss of crew life (LOCL), and probability of evacuation (EVAC). Scatter plots of observed versus median predicted TMEs (with error bars reflecting the simulation intervals) will graphically display comparisons while linear regression will serve as the statistical test of agreement. Two scatter plots will be analyzed 1) where each point reflects a mission and 2) where each point reflects a condition-specific total number of occurrences. The coefficient of determination (R2) resulting from a linear regression with no intercept bias (intercept fixed at zero) will serve as an overall metric of agreement between IMM and the real world system (RWS). In an effort to identify as many possible discrepancies as possible for further inspection, the -level for all statistical tests comparing IMM predictions to observed data will be set to 0.1. This less stringent criterion, along with the multiple testing being conducted, should detect all perceived differences including many false positive signals resulting from random variation. The results of these analyses will reveal areas of the model requiring adjustment to improve overall IMM output, which will thereby provide better decision support for

  11. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  12. Knowledge and information management for integrated water resource management

    Science.gov (United States)

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  13. Integrating Total Quality Management (TQM) and hazardous waste management

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Nancy [Colorado State Univ., Fort Collins, CO (United States)

    1993-11-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ``cradle to grave`` management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ``front-end`` treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ``mixed waste`` at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components.

  14. Integrating Total Quality Management (TQM) and hazardous waste management

    International Nuclear Information System (INIS)

    Kirk, N.

    1993-01-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ''cradle to grave'' management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ''front-end'' treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ''mixed waste'' at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components

  15. CILogon: An Integrated Identity and Access Management Platform for Science

    Science.gov (United States)

    Basney, J.

    2016-12-01

    When scientists work together, they use web sites and other software to share their ideas and data. To ensure the integrity of their work, these systems require the scientists to log in and verify that they are part of the team working on a particular science problem. Too often, the identity and access verification process is a stumbling block for the scientists. Scientific research projects are forced to invest time and effort into developing and supporting Identity and Access Management (IAM) services, distracting them from the core goals of their research collaboration. CILogon provides an IAM platform that enables scientists to work together to meet their IAM needs more effectively so they can allocate more time and effort to their core mission of scientific research. The CILogon platform enables federated identity management and collaborative organization management. Federated identity management enables researchers to use their home organization identities to access cyberinfrastructure, rather than requiring yet another username and password to log on. Collaborative organization management enables research projects to define user groups for authorization to collaboration platforms (e.g., wikis, mailing lists, and domain applications). CILogon's IAM platform serves the unique needs of research collaborations, namely the need to dynamically form collaboration groups across organizations and countries, sharing access to data, instruments, compute clusters, and other resources to enable scientific discovery. CILogon provides a software-as-a-service platform to ease integration with cyberinfrastructure, while making all software components publicly available under open source licenses to enable re-use. Figure 1 illustrates the components and interfaces of this platform. CILogon has been operational since 2010 and has been used by over 7,000 researchers from more than 170 identity providers to access cyberinfrastructure including Globus, LIGO, Open Science Grid

  16. Integrated water and waste management

    DEFF Research Database (Denmark)

    Harremoës, P.

    1997-01-01

    The paper discusses concepts and developments within water quantity, water quality, integrated environmental assessment and wastewater treatment. The historical and the global perspectives are used in the discussion of the role of engineers in today's society. Sustainabilty and ethics are taken...... into the analysis. There is a need for re-evaluation of the resource, society and environment scenarios with a view to the totality of the system and with proper analysis of the flow of water and matter through society. Among the tools are input-output analysis and cradle to grave analysis, in combination...... with compilation of identified sets of values with respect to sustainable use of resources and ultimate fate of the environment and quality of life. The role of the engineer is to make available to society as many technical options as possible - and to put these options into the proper perspective in relation...

  17. The Future of Asset Management for Human Space Exploration: Supply Classification and an Integrated Database

    Science.gov (United States)

    Shull, Sarah A.; Gralla, Erica L.; deWeck, Olivier L.; Shishko, Robert

    2006-01-01

    One of the major logistical challenges in human space exploration is asset management. This paper presents observations on the practice of asset management in support of human space flight to date and discusses a functional-based supply classification and a framework for an integrated database that could be used to improve asset management and logistics for human missions to the Moon, Mars and beyond.

  18. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  19. Integrated solid waste management in megacities

    Directory of Open Access Journals (Sweden)

    M.A. Abdoli

    2016-05-01

    Full Text Available Rapid urbanization and industrialization, population growth and economic growth in developing countries make management of municipal solid waste more complex comparing with developed countries. Furthermore, the conventional municipal solid waste management approach often is reductionists, not tailored to handle complexity. Therefore, the need to a comprehensive and multi-disciplinary approach regarding the municipal solid waste management problems is increasing. The concept of integrated solid waste management is accepted for this aim all over the world. This paper analyzes the current situation as well as opportunities and challenges regarding municipal solid waste management in Isfahan according to the integrated solid waste management framework in six aspects: environmental, political/legal, institutional, socio-cultural, financial/economic, technical and performance aspects. Based on the results obtained in this analysis, the main suggestions for future integrated solid waste management of Isfahan are as i promoting financial sustainability by taking the solid waste fee and reducing the expenses through the promoting source collection of recyclable materials, ii improving compost quality and also marketing the compost products simultaneously, iii promoting the private sector involvements throughout the municipal solid waste management system.

  20. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  1. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  2. Integrated management in calcareous soils

    International Nuclear Information System (INIS)

    Castilla, Luis A; Salive, A

    2001-01-01

    Rice growing is developed in different kinds of soils, and some of the have high bases saturation, especially calcium and magnesium, as well as medium to high carbonate contents. This causes negative effects in the development and growth of the rice plant. As a consequence, several researching actions have been under-taken, and they are aimed at becoming this problem in economically manageable. Among the strategies we have, some of them are as follows: evaluating rice varieties presenting tolerance to these soils; using inorganic fertilizers looking for a response to elements, sources, dose and application times; evaluating organic fertilizers, mainly the green ones; using amendments, and physical soil management. According to the results, we have the fertilization response with major and minor elements and with the statistical differences at a 0.05% level. A response was found with elements such as zinc, copper, boron, iron, phosphorus and potassium. However, the efficiency of these elements depends on the addition of amendments as sulfur, the use of green fertilizers and farming systems that eliminate the superficial compaction of these soils, besides the use of varieties which are more tolerant to alkalinity, just like Fedearroz-50

  3. Renewed mer model of integral management

    Directory of Open Access Journals (Sweden)

    Janko Belak

    2015-12-01

    Full Text Available Background: The research work on entrepreneurship, enterprise's policy and management, which started in 1992, successfully continued in the following years. Between 1992 and 2011, more than 400 academics and other researchers have participated in research work (MER research program whose main orientation has been the creation of their own model of integral management. Results: In past years, academics (researchers and authors of published papers from Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Byelorussia, Canada, the Czech Republic, Croatia, Estonia, France, Germany, Hungary, Italy, Poland, Romania, Russia, the Slovak Republic, Slovenia, Switzerland, Ukraine, and the US have cooperated in MER programs, coming from more than fifty institutions. Thus, scientific doctrines of different universities influenced the development of the MER model which is based on both horizontal and vertical integration of the enterprises' governance and management processes, instruments and institutions into a consistently operating unit. Conclusions: The presented MER model is based on the multi-layer integration of governance and management with an enterprise and its environment, considering the fundamental desires for the enterprises' existence and, thus, their quantitative as well as qualitative changes. The process, instrumental, and institutional integrity of the governance and management is also the initial condition for the implementation of all other integration factors.

  4. Applied Knowledge Management to Mitigate Cognitive Load in Network-Enabled Mission Command

    Science.gov (United States)

    2017-11-22

    ARL-TN-0859 ● NOV 2017 US Army Research Laboratory Applied Knowledge Management to Mitigate Cognitive Load in Network-Enabled...Applied Knowledge Management to Mitigate Cognitive Load in Network-Enabled Mission Command by John K Hawley Human Research and Engineering...REPORT TYPE Technical Note 3. DATES COVERED (From - To) 1 May 2016–20 April 2017 4. TITLE AND SUBTITLE Applied Knowledge Management to Mitigate

  5. Modeling for Integrated Science Management and Resilient Systems Development

    Science.gov (United States)

    Shelhamer, M.; Mindock, J.; Lumpkins, S.

    2014-01-01

    Many physiological, environmental, and operational risks exist for crewmembers during spaceflight. An understanding of these risks from an integrated perspective is required to provide effective and efficient mitigations during future exploration missions that typically have stringent limitations on resources available, such as mass, power, and crew time. The Human Research Program (HRP) is in the early stages of developing collaborative modeling approaches for the purposes of managing its science portfolio in an integrated manner to support cross-disciplinary risk mitigation strategies and to enable resilient human and engineered systems in the spaceflight environment. In this talk, we will share ideas being explored from fields such as network science, complexity theory, and system-of-systems modeling. Initial work on tools to support these explorations will be discussed briefly, along with ideas for future efforts.

  6. Power management techniques for integrated circuit design

    CERN Document Server

    Chen, Ke-Horng

    2016-01-01

    This book begins with the premise that energy demands are directing scientists towards ever-greener methods of power management, so highly integrated power control ICs (integrated chip/circuit) are increasingly in demand for further reducing power consumption. * A timely and comprehensive reference guide for IC designers dealing with the increasingly widespread demand for integrated low power management * Includes new topics such as LED lighting, fast transient response, DVS-tracking and design with advanced technology nodes * Leading author (Chen) is an active and renowned contributor to the power management IC design field, and has extensive industry experience * Accompanying website includes presentation files with book illustrations, lecture notes, simulation circuits, solution manuals, instructors manuals, and program downloads.

  7. Class D management implementation approach of the first orbital mission of the Earth Venture series

    Science.gov (United States)

    Wells, James E.; Scherrer, John; Law, Richard; Bonniksen, Chris

    2013-09-01

    A key element of the National Research Council's Earth Science and Applications Decadal Survey called for the creation of the Venture Class line of low-cost research and application missions within NASA (National Aeronautics and Space Administration). One key component of the architecture chosen by NASA within the Earth Venture line is a series of self-contained stand-alone spaceflight science missions called "EV-Mission". The first mission chosen for this competitively selected, cost and schedule capped, Principal Investigator-led opportunity is the CYclone Global Navigation Satellite System (CYGNSS). As specified in the defining Announcement of Opportunity, the Principal Investigator is held responsible for successfully achieving the science objectives of the selected mission and the management approach that he/she chooses to obtain those results has a significant amount of freedom as long as it meets the intent of key NASA guidance like NPR 7120.5 and 7123. CYGNSS is classified under NPR 7120.5E guidance as a Category 3 (low priority, low cost) mission and carries a Class D risk classification (low priority, high risk) per NPR 8705.4. As defined in the NPR guidance, Class D risk classification allows for a relatively broad range of implementation strategies. The management approach that will be utilized on CYGNSS is a streamlined implementation that starts with a higher risk tolerance posture at NASA and that philosophy flows all the way down to the individual part level.

  8. Class D Management Implementation Approach of the First Orbital Mission of the Earth Venture Series

    Science.gov (United States)

    Wells, James E.; Scherrer, John; Law, Richard; Bonniksen, Chris

    2013-01-01

    A key element of the National Research Council's Earth Science and Applications Decadal Survey called for the creation of the Venture Class line of low-cost research and application missions within NASA (National Aeronautics and Space Administration). One key component of the architecture chosen by NASA within the Earth Venture line is a series of self-contained stand-alone spaceflight science missions called "EV-Mission". The first mission chosen for this competitively selected, cost and schedule capped, Principal Investigator-led opportunity is the CYclone Global Navigation Satellite System (CYGNSS). As specified in the defining Announcement of Opportunity, the Principal Investigator is held responsible for successfully achieving the science objectives of the selected mission and the management approach that he/she chooses to obtain those results has a significant amount of freedom as long as it meets the intent of key NASA guidance like NPR 7120.5 and 7123. CYGNSS is classified under NPR 7120.5E guidance as a Category 3 (low priority, low cost) mission and carries a Class D risk classification (low priority, high risk) per NPR 8705.4. As defined in the NPR guidance, Class D risk classification allows for a relatively broad range of implementation strategies. The management approach that will be utilized on CYGNSS is a streamlined implementation that starts with a higher risk tolerance posture at NASA and that philosophy flows all the way down to the individual part level.

  9. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Hopkins, J.R.

    1998-01-01

    An integrated approach to plant life management has been developed for CANDU reactors. Strategies, methods, and procedures have been developed for assessment of critical systems structures and components and for implementing a reliability centred maintenance program. A Technology Watch program is being implemented to eliminate 'surprises'. Specific work has been identified for 1998. AECL is working on the integrated program with CANDU owners and seeks participation from other CANDU owners

  10. Integration of Standardized Management Systems: A Dilemma?

    Directory of Open Access Journals (Sweden)

    Manuel Ferreira Rebelo

    2015-06-01

    Full Text Available The growing proliferation of management systems standards (MSSs, and their individualized implementation, is a real problem faced by organizations. On the other hand, MSSs are aimed at improving efficiency and effectiveness of organizational responses in order to satisfy the requirements, needs and expectations of the stakeholders. Each organization has its own identity and this is an issue that cannot be neglected; hence, two possible approaches can be attended. First, continue with the implementation of individualized management systems (MSs; or, integrate the several MSSs versus related MSs into an integrated management system (IMS. Therefore, in this context, organizations are faced with a dilemma, as a result of the increasing proliferation and diversity of MSSs. This paper takes into account the knowledge gained through a case study conducted in the context of a Portuguese company and unveils some of the advantages and disadvantages of integration. A methodology is also proposed and presented to support organizations in developing and structuring the integration process of their individualized MSs, and consequently minimize problems that are generators of inefficiencies, value destruction and loss of competitiveness. The obtained results provide relevant information that can support Top Management decision in solving that dilemma and consequently promote a successful integration, including a better control of business risks associated to MSSs requirements and enhancing sustainable performance, considering the context in which organizations operate.

  11. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  12. Integrated economic management. Principal aspects and future

    International Nuclear Information System (INIS)

    2004-01-01

    Now that five years have passed (1999-2003) since the Owner Companies decided to merge the Asco and Vandellos-II nuclear power plants, we believe that, for Integrated Management through a single AIE, it is timely and advisable to describe the key issues of the process implemented to optimize economic results, always in accordance with the Policies of Nuclear Safety, Quality and Environment, Prevention, Human Factors and Availability, and we emphasize the following as essential elements: The Corporate Model; strategic/Operating Plans; integrated Economic Management Model SIE; Rationalization of the organizational structure, Continuous Training; Analysis of Processes and Procedures. (Author)

  13. Year 2000 Compliance of Selected Mission Critical Command, Control, and Communications Systems Managed by The Defense Information Systems Agency

    National Research Council Canada - National Science Library

    1999-01-01

    ...) has adequately planned for and managed year 2000 conversion risks to avoid undue disruption to selected mission critical command, control, and communications systems used in support of Unified...

  14. Integrated propulsion for near-Earth space missions. Volume 2: Technical

    Science.gov (United States)

    Dailey, C. L.; Meissinger, H. F.; Lovberg, R. H.; Zafran, S.

    1981-01-01

    The calculation approach is described for parametric analysis of candidate electric propulsion systems employed in LEO to GEO missions. Occultation relations, atmospheric density effects, and natural radiation effects are presented. A solar cell cover glass tradeoff is performed to determine optimum glass thickness. Solar array and spacecraft pointing strategies are described for low altitude flight and for optimum array illumination during ascent. Mass ratio tradeoffs versus transfer time provide direction for thruster technology improvements. Integrated electric propulsion analysis is performed for orbit boosting, inclination change, attitude control, stationkeeping, repositioning, and disposal functions as well as power sharing with payload on orbit. Comparison with chemical auxiliary propulsion is made to quantify the advantages of integrated propulsion in terms of weight savings and concomittant launch cost savings.

  15. Savannah River Site FY 2001 Spent Nuclear Fuel Integrated Management Plan

    International Nuclear Information System (INIS)

    Dunsmuir, M.D.

    2000-01-01

    This document presents the SRS integrated near and long-term plans (FY 2001 through 2035) for the safe life cycle management of SNF inventories and other SFSD legacy material programs/projects that impact this mission until final disposition has been implemented

  16. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  17. Integrated Management System - Scope, Possibilities And Methodology

    Science.gov (United States)

    Čekanová, Katarína

    2015-06-01

    Organizations are becoming more aware of the importance of integrated management systems (IMS). Interest in this subject indicates that IMS are seen as "management systems of the future". Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  18. Toward integrated design of waste management technologies

    International Nuclear Information System (INIS)

    Carnes, S.A.; Wolfe, A.K.

    1994-01-01

    Implementation of waste management technologies has been hindered by the intervention of diverse interests. Relying on a perceived history of inadequate and improper management, operations, and technological design, critics have stymied the implementation of scientifically and governmentally approved technologies and facilities, leading to a critical shortage of hazardous, mixed, and radioactive waste management capacity. The research and development (R ampersand D) required to identify technologies that are simultaneously (1) scientifically valid, (2) economically sound, and (3) publicly acceptable must necessarily address, in an integrated and interdisciplinary manner, these three criteria and how best to achieve the integration of stakeholders early in the technology implementation process (i.e., R ampersand D, demonstration, and commercialization). The goal of this paper is to initiate an identification of factors likely to render radioactive and hazardous waste management technologies publicly acceptable and to provide guidance on how technological R ampersand D might be revised to enhance the acceptability of alternative waste management technologies. Principal among these factors are the equitable distribution of costs, risks, and benefits of waste management policies and technologies, the equitable distribution of authority for making waste management policy and selecting technologies for implementation, and the equitable distribution of responsibility for resolving waste management problems. Stakeholder participation in assessing the likely distribution of these factors and mitigative mechanisms to enhance their equitable distribution, together with stakeholder participation in policy and technology R ampersand D, as informed by stakeholder assessments, should enhance the identification of acceptable policies and technologies

  19. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  20. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  1. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  2. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  3. Payload operations management of a planned European SL-Mission employing establishments of ESA and national agencies

    Science.gov (United States)

    Joensson, Rolf; Mueller, Karl L.

    1994-01-01

    Spacelab (SL)-missions with Payload Operations (P/L OPS) from Europe involve numerous space agencies, various ground infrastructure systems and national user organizations. An effective management structure must bring together different entities, facilities and people, but at the same time keep interfaces, costs and schedule under strict control. This paper outlines the management concept for P/L OPS of a planned European SL-mission. The proposal draws on the relevant experience in Europe, which was acquired via the ESA/NASA mission SL-1, by the execution of two German SL-missions and by the involvement in, or the support of, several NASA-missions.

  4. Human Exploration System Test-Bed for Integration and Advancement (HESTIA) Support of Future NASA Deep-Space Missions

    Science.gov (United States)

    Marmolejo, Jose; Ewert, Michael

    2016-01-01

    The Engineering Directorate at the NASA - Johnson Space Center is outfitting a 20-Foot diameter hypobaric chamber in Building 7 to support future deep-space Environmental Control & Life Support System (ECLSS) research as part of the Human Exploration System Test-bed for Integration and Advancement (HESTIA) Project. This human-rated chamber is the only NASA facility that has the unique experience, chamber geometry, infrastructure, and support systems capable of conducting this research. The chamber was used to support Gemini, Apollo, and SkyLab Missions. More recently, it was used to conduct 30-, 60-, and 90-day human ECLSS closed-loop testing in the 1990s to support the International Space Station and life support technology development. NASA studies show that both planetary surface and deep-space transit crew habitats will be 3-4 story cylindrical structures driven by human occupancy volumetric needs and launch vehicle constraints. The HESTIA facility offers a 3-story, 20-foot diameter habitat consistent with the studies' recommendations. HESTIA operations follow stringent processes by a certified test team that including human testing. Project management, analysis, design, acquisition, fabrication, assembly and certification of facility build-ups are available to support this research. HESTIA offers close proximity to key stakeholders including astronauts, Human Research Program (who direct space human research for the agency), Mission Operations, Safety & Mission Assurance, and Engineering Directorate. The HESTIA chamber can operate at reduced pressure and elevated oxygen environments including those proposed for deep-space exploration. Data acquisition, power, fluids and other facility resources are available to support a wide range of research. Recently completed HESTIA research consisted of unmanned testing of ECLSS technologies. Eventually, the HESTIA research will include humans for extended durations at reduced pressure and elevated oxygen to demonstrate

  5. Plant life management. Progress for structural integrity

    International Nuclear Information System (INIS)

    Solin, J.

    2003-03-01

    A joint project cluster of industry, VTT and other R and D suppliers is dealing with managing of lifetime of critical structures and components in energy and process industry. The research topics include systematic component lifetime management, data management, integrity and lifetime of pressure bearing components, non-destructive inspection, interactions of coolant and materials, environmentally assisted cracking and ageing of reactor internals. This Symposium is a compilation of selected papers describing an intermediate status of the projects after three years of research and development. (orig.)

  6. Integrated Pest Management Research Symposium: The Proceedings

    Science.gov (United States)

    Susan J. Branham; Robert C. Thatcher; [Editors

    1985-01-01

    Thirty-seven papers are presented that summarize the findings from research and development work conducted as a part of the Integrated Pest Management RD&A Program for Bark Beetles of Southern Pines during the 5-year period 1980-85. Presentations cover the areas of sampling and impact assessment, bark beetle biology and ecology, host susceptibility, host/pest...

  7. Integrated Management of Structural Pests in Schools.

    Science.gov (United States)

    Illinois State Dept. of Public Health, Springfield.

    The state of Illinois is encouraging schools to better inspect and evaluate the causes of their pest infestation problems through use of the Integrated Pest Management (IPM) guidelines developed by the Illinois Department of Public Health. This guide reviews the philosophy and organization of an IPM program for structural pests in schools,…

  8. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  9. Implementing Integrated River Basin Management in China

    NARCIS (Netherlands)

    Boekhorst, D.G.J. te; Smits, A.J.M.; Yu, X.; Lifeng, L.; Lei, G.; Zhang, C.

    2010-01-01

    This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are

  10. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    Background: Save the Children Tanzania has been supporting several projects in Lindi Region including implementation of health facility based Integrated Management of Childhood Illness (IMCI) services in Kilwa, Ruangwa and Lindi rural districts. The objective of this study was to assess the IMCI services in a sample of ...

  11. Thermal Performance of a Cryogenic Fluid Management Cubesat Mission

    Science.gov (United States)

    Berg, J. J.; Oliveira, J. M.; Congiardo, J. F.; Walls, L. K.; Putman, P. T.; Haberbusch, M. S.

    2013-01-01

    Development for an in-space demonstration of a CubeS at as a Cryogenic Fluid Management (CFM) test bed is currently underway. The favorable economics of CubeSats make them appealing for technology development activity. While their size limits testing to smaller scales, many of the regimes relevant to CFM can still be achieved. The first demo flight of this concept, CryoCube®-1, will focus on oxygen liquefaction and low-gravity level sensing using Reduced Gravity CryoTracker®. An extensive thermal modeling effort has been underway to both demonstrate concept feasibility and drive the prototype design. The satellite will utilize both a sun- and earth-shield to passively cool its experimental tank below 115 K. An on-board gas generator will create high pressure gaseous oxygen, which will be throttled into a bottle in the experimental node and condensed. The resulting liquid will be used to perform various experiments related to level sensing. Modeling efforts have focused on the spacecraft thermal performance and its effects on condensation in the experimental node. Parametric analyses for both optimal and suboptimal conditions have been considered and are presented herein.

  12. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  13. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  14. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  15. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  16. Ontology modeling in physical asset integrity management

    CERN Document Server

    Yacout, Soumaya

    2015-01-01

    This book presents cutting-edge applications of, and up-to-date research on, ontology engineering techniques in the physical asset integrity domain. Though a survey of state-of-the-art theory and methods on ontology engineering, the authors emphasize essential topics including data integration modeling, knowledge representation, and semantic interpretation. The book also reflects novel topics dealing with the advanced problems of physical asset integrity applications such as heterogeneity, data inconsistency, and interoperability existing in design and utilization. With a distinctive focus on applications relevant in heavy industry, Ontology Modeling in Physical Asset Integrity Management is ideal for practicing industrial and mechanical engineers working in the field, as well as researchers and graduate concerned with ontology engineering in physical systems life cycles. This book also: Introduces practicing engineers, research scientists, and graduate students to ontology engineering as a modeling techniqu...

  17. Generic procedure for designing and implementing plan management systems for space science missions operations

    Science.gov (United States)

    Chaizy, P. A.; Dimbylow, T. G.; Allan, P. M.; Hapgood, M. A.

    2011-09-01

    This paper is one of the components of a larger framework of activities whose purpose is to improve the performance and productivity of space mission systems, i.e. to increase both what can be achieved and the cost effectiveness of this achievement. Some of these activities introduced the concept of Functional Architecture Module (FAM); FAMs are basic blocks used to build the functional architecture of Plan Management Systems (PMS). They also highlighted the need to involve Science Operations Planning Expertise (SOPE) during the Mission Design Phase (MDP) in order to design and implement efficiently operation planning systems. We define SOPE as the expertise held by people who have both theoretical and practical experience in operations planning, in general, and in space science operations planning in particular. Using ESA's methodology for studying and selecting science missions we also define the MDP as the combination of the Mission Assessment and Mission Definition Phases. However, there is no generic procedure on how to use FAMs efficiently and systematically, for each new mission, in order to analyse the cost and feasibility of new missions as well as to optimise the functional design of new PMS; the purpose of such a procedure is to build more rapidly and cheaply such PMS as well as to make the latter more reliable and cheaper to run. This is why the purpose of this paper is to provide an embryo of such a generic procedure and to show that the latter needs to be applied by people with SOPE during the MDP. The procedure described here proposes some initial guidelines to identify both the various possible high level functional scenarii, for a given set of possible requirements, and the information that needs to be associated with each scenario. It also introduces the concept of catalogue of generic functional scenarii of PMS for space science missions. The information associated with each catalogued scenarii will have been identified by the above procedure and

  18. Integrated science and engineering for the OSIRIS-REx asteroid sample return mission

    Science.gov (United States)

    Lauretta, D.

    2014-07-01

    Introduction: The Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer (OSIRIS-REx) asteroid sample return mission will survey near-Earth asteroid (101955) Bennu to understand its physical, mineralogical, and chemical properties, assess its resource potential, refine the impact hazard, and return a sample of this body to the Earth [1]. This mission is scheduled for launch in 2016 and will rendezvous with the asteroid in 2018. Sample return to the Earth follows in 2023. The OSIRIS-REx mission has the challenge of visiting asteroid Bennu, characterizing it at global and local scales, then selecting the best site on the asteroid surface to acquire a sample for return to the Earth. Minimizing the risk of exploring an unknown world requires a tight integration of science and engineering to inform flight system and mission design. Defining the Asteroid Environment: We have performed an extensive astronomical campaign in support of OSIRIS-REx. Lightcurve and phase function observations were obtained with UA Observatories telescopes located in southeastern Arizona during the 2005--2006 and 2011--2012 apparitions [2]. We observed Bennu using the 12.6-cm radar at the Arecibo Observatory in 1999, 2005, and 2011 and the 3.5-cm radar at the Goldstone tracking station in 1999 and 2005 [3]. We conducted near-infrared measurements using the NASA Infrared Telescope Facility at the Mauna Kea Observatory in Hawaii in September 2005 [4]. Additional spectral observations were obtained in July 2011 and May 2012 with the Magellan 6.5-m telescope [5]. We used the Spitzer space telescope to observe Bennu in May 2007 [6]. The extensive knowledge gained as a result of our telescopic characterization of Bennu was critical in the selection of this object as the OSIRIS-REx mission target. In addition, we use these data, combined with models of the asteroid, to constrain over 100 different asteroid parameters covering orbital, bulk, rotational, radar

  19. Integrated Simulation Of Supply Chain Management

    Directory of Open Access Journals (Sweden)

    N.Manikandan

    2013-06-01

    Full Text Available Nowadays, manufacturers face the challenge of reducing manufacturing cycle time, delivery lead time and inventory reduction. Every organization has its own objectives and its own way of decision making processes. Because of the conflictions among the objectives of each organization and non-integrated decision making processes, there has been a need for a new mechanism, which help to resolve those conflictions and to integrate processes. In the early 1990s, management is a process of integrating and utilizing suppliers, manufacturers, warehouses and retailers, so that goods are produced and delivered at the right quantities and at the right time while minimizing costs as well as satisfying customer requirements. Managing the entire supply chain becomes a key factor for the successful business. Organizations now realize that non-integrated manufacturing processes, nonintegrated distribution processes and poor relationships with suppliers and customers are in adequate for their success. The supply chain areas are affected by the organization’s plan. The organization plan’s impact on the supply chain areas cannot be predicted before its execution. Simulation paves way to evaluate the performance of plans before the execution of the plan. This paper describes the effort of developing a simulation model for the supply chain management in an industry. This article discusses the requirement of supply chain simulation modeling.

  20. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  1. Open Source GIS based integrated watershed management

    Science.gov (United States)

    Byrne, J. M.; Lindsay, J.; Berg, A. A.

    2013-12-01

    Optimal land and water management to address future and current resource stresses and allocation challenges requires the development of state-of-the-art geomatics and hydrological modelling tools. Future hydrological modelling tools should be of high resolution, process based with real-time capability to assess changing resource issues critical to short, medium and long-term enviromental management. The objective here is to merge two renowned, well published resource modeling programs to create an source toolbox for integrated land and water management applications. This work will facilitate a much increased efficiency in land and water resource security, management and planning. Following an 'open-source' philosophy, the tools will be computer platform independent with source code freely available, maximizing knowledge transfer and the global value of the proposed research. The envisioned set of water resource management tools will be housed within 'Whitebox Geospatial Analysis Tools'. Whitebox, is an open-source geographical information system (GIS) developed by Dr. John Lindsay at the University of Guelph. The emphasis of the Whitebox project has been to develop a user-friendly interface for advanced spatial analysis in environmental applications. The plugin architecture of the software is ideal for the tight-integration of spatially distributed models and spatial analysis algorithms such as those contained within the GENESYS suite. Open-source development extends knowledge and technology transfer to a broad range of end-users and builds Canadian capability to address complex resource management problems with better tools and expertise for managers in Canada and around the world. GENESYS (Generate Earth Systems Science input) is an innovative, efficient, high-resolution hydro- and agro-meteorological model for complex terrain watersheds developed under the direction of Dr. James Byrne. GENESYS is an outstanding research and applications tool to address

  2. Momentum Management for the NASA Near Earth Asteroid Scout Solar Sail Mission

    Science.gov (United States)

    Heaton, Andrew; Diedrich, Benjamin L.; Orphee, Juan; Stiltner, Brandon; Becker, Christopher

    2017-01-01

    The Momentum Management (MM) system is described for the NASA Near Earth Asteroid Scout (NEA Scout) cubesat solar sail mission. Unlike many solar sail mission proposals that used solar torque as the primary or only attitude control system, NEA Scout uses small reaction wheels (RW) and a reaction control system (RCS) with cold gas thrusters, as described in the abstract "Solar Sail Attitude Control System for Near Earth Asteroid Scout Cubesat Mission." The reaction wheels allow fine pointing and higher rates with low mass actuators to meet the science, communication, and trajectory guidance requirements. The MM system keeps the speed of the wheels within their operating margins using a combination of solar torque and the RCS.

  3. An integrated mission approach to the space exploration initiative will ensure success

    International Nuclear Information System (INIS)

    Coomes, E.P.; Dagle, J.E.; Bamberger, J.A.; Noffsinger, K.E.

    1991-01-01

    The direction of the American space program, as defined by President Bush and the National Commission on Space, is to expand human presence into the solar system. Landing an American on Mars by the 50th anniversary of the Apollo 11 lunar landing is the goal. This challenge has produced a level of excitement among young Americans not seen for nearly three decades. The exploration and settlement of the space frontier will occupy the creative thoughts and energies of generations of Americans well into the next century. The return of Americans to the moon and beyond must be viewed as a national effort with strong public support if it is to become a reality. Key to making this an actuality is the mission approach selected. Developing a permanent presence in space requires a continual stepping outward from Earch in a logical progressive manner. If we seriously plan to go and to stay, then not only must we plan what we are to do and how we are to do it, we must address the logistic support infrastructure that will allow us to stay there once we arrive. A fully integrated approach to mission planning is needed if the Space exploration Initiative (SEI) is to be successful. Only in this way can a permanent human presence in space be sustained. An integrated infrastructure approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI while an early return on investment through technology spin-offs would be an economic benefit by greatly enhancing our international technical competitiveness. If the exploration, development, and colonization of space is to be affordable and acceptable, careful consideration must be given to such things as ''return on investment'' and ''commercial product potential'' of the technologies developed

  4. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The Japanese, through a combination of public policy, private market conditions, a geographic necessity, practice integrated municipal solid waste (MSW) management. The approach of MSW management in Japan is as follows: The basic concept of refuse treatment consists of recycling discharged refuse into usable resources, reusing such resources as much as possible, and then treating or disposing of the usable portion into a sanitary condition. Considering the difficulty of procuring land or seaside areas for such purpose as a refuse disposal site, it will be necessary to minimize the volume of refuse collected for treatment or disposal.

  5. Increasing efficiency through integrated energy data management

    International Nuclear Information System (INIS)

    Brack, M.

    2002-01-01

    This article discusses how improved management of energy data can bring about the increase in efficiency that is necessary for an electricity enterprise operating in a liberalised electricity market. The relevant technical and business processes involved for a typical power distribution utility are described. The present situation is reviewed and the various physical, data-logistics and commercial 'domains' involved are examined. Possible solutions for energy data logistics and integrated data management are discussed from the points of view of the operating utility, the power supplier and those responsible for balancing out supply and demand

  6. The Faster, Better, Cheaper Approach to Space Missions: An Engineering Management Assessment

    Science.gov (United States)

    Hamaker, Joe

    2000-01-01

    This paper describes, in viewgraph form, the faster, better, cheaper approach to space missions. The topics include: 1) What drives "Faster, Better, Cheaper"? 2) Why Space Programs are Costly; 3) Background; 4) Aerospace Project Management (Old Culture); 5) Aerospace Project Management (New Culture); 6) Scope of Analysis Limited to Engineering Management Culture; 7) Qualitative Analysis; 8) Some Basic Principles of the New Culture; 9) Cause and Effect; 10) "New Ways of Doing Business" Survey Results; 11) Quantitative Analysis; 12) Recent Space System Cost Trends; 13) Spacecraft Dry Weight Trend; 14) Complexity Factor Trends; 15) Cost Normalization; 16) Cost Normalization Algorithm; 17) Unnormalized Cost vs. Normalized Cost; and 18) Concluding Observations.

  7. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  8. Asset management -- Integrated software optimizes production performance

    International Nuclear Information System (INIS)

    Polczer, S.

    1998-01-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle's universal data server software development tools with ATS's upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting

  9. Asset management -- Integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-10-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server software development tools with ATS`s upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting.

  10. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  11. Investigation of Integrated Vehicle Health Management Approaches

    Science.gov (United States)

    Paris, Deidre

    2005-01-01

    This report is to present the work that was performed during the summer in the Advance Computing Application office. The NFFP (NASA Faculty Fellow Program) had ten summer faculty members working on IVHM (Integrated Vehicle Health Management) technologies. The objective of this project was two-fold: 1) to become familiar with IVHM concepts and key demonstrated IVHM technologies; and 2) to integrate the research that has been performed by IVHM faculty members into the MASTLAB (Marshall Avionic Software Test Lab). IVHM is a NASA-wide effort to coordinate, integrate and apply advanced software, sensors and design technologies to increase the level of intelligence, autonomy, and health state of future vehicles. IVHM is an important concept because it is consistent with the current plan for NASA to go to the moon, mars, and beyond. In order for NASA to become more involved in deep exploration, avionic systems will need to be highly adaptable and autonomous.

  12. Reusing Information Management Services for Recommended Decadal Study Missions to Facilitate Aerosol and Cloud Studies

    Science.gov (United States)

    Kempler, Steve; Alcott, Gary; Lynnes, Chris; Leptoukh, Greg; Vollmer, Bruce; Berrick, Steve

    2008-01-01

    NASA Earth Sciences Division (ESD) has made great investments in the development and maintenance of data management systems and information technologies, to maximize the use of NASA generated Earth science data. With information management system infrastructure in place, mature and operational, very small delta costs are required to fully support data archival, processing, and data support services required by the recommended Decadal Study missions. This presentation describes the services and capabilities of the Goddard Space Flight Center (GSFC) Earth Sciences Data and Information Services Center (GES DISC) and the reusability for these future missions. The GES DISC has developed a series of modular, reusable data management components currently in use. They include data archive and distribution (Simple, Scalable, Script-based, Science [S4] Product Archive aka S4PA), data processing (S4 Processor for Measurements aka S4PM), data search (Mirador), data browse, visualization, and analysis (Giovanni), and data mining services. Information management system components are based on atmospheric scientist inputs. Large development and maintenance cost savings can be realized through their reuse in future missions.

  13. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  14. Management of area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    Dyck, V.A.; Vreysen, M.J.B.; Reyes Flores, J.; Regidor Fernandez, E.E.; Teruya, T.; Barnes, B.; Gomez Riera, P.; Lindquist, D.; Loosjes, M.

    2005-01-01

    Effective management of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) is key to success. Programme planning includes collection of baseline data and a feasibility assessment. The optimal management structure is where the programme can be implemented effectively and flexibly, independent of government politics, bureaucracy, and even corruption that impede timely goal achievement. Ideally, programmes include both public and private management, and require strong and steady financial support. Governments and donors are the most common sources of funds, but a mixture of public, community, and private funds is now the trend. Interrupted cash flow severely restrains programme performance. Physical support of programme operations must be reliable, and led by a maintenance professional. It is essential to have full-time, well-paid, and motivated staff led by a programme manger with technical and management experience. Programme failure is usually due to poor management and inadequate public support, and not to poor technology. (author)

  15. Integrative Physical and Cognitive Training Development to Better Meet Airman Mission Requirements

    Science.gov (United States)

    2015-07-26

    Integrated Physical and Cognitive Exercises 3.1. Tracking Squats. Working memory, described as a temporary holding and processing system for...based operators, [e.g., Combat Controller, Joint Terminal Attack Controller (JTAC), and Air Battle Management ( ABM ) Operators] are faced with...context of speed and agility running exercise. To perform this exercise we use the Fitlight Trainer ®, a wireless reaction system comprised of 8

  16. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  17. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  18. An integrated mission approach to the space exploration initiative will ensure success

    Science.gov (United States)

    Coomes, Edmund P.; Dagle, Jefferey E.; Bamberger, Judith A.; Noffsinger, Kent E.

    1991-01-01

    The direction of the American space program, as defined by President Bush and the National Commission on Space, is to expand human presence into the solar system. Landing an American on Mars by the 50th anniversary of the Apollo 11 lunar landing is the goal. This challenge has produced a level of excitement among young Americans not seen for nearly three decades. The exploration and settlement of the space frontier will occupy the creative thoughts and energies of generations of Americans well into the next century. The return of Americans to the moon and beyond must be viewed as a national effort with strong public support if it is to become a reality. Key to making this an actuality is the mission approach selected. Developing a permanent presence in space requires a continual stepping outward from Earch in a logical progressive manner. If we seriously plan to go and to stay, then not only must we plan what we are to do and how we are to do it, we must address the logistic support infrastructure that will allow us to stay there once we arrive. A fully integrated approach to mission planning is needed if the Space exploration Initiative (SEI) is to be successful. Only in this way can a permanent human presence in space be sustained. An integrated infrastructure approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI while an early return on investment through technology spin-offs would be an economic benefit by greatly enhancing our international technical competitiveness. If the exploration, development, and colonization of space is to be affordable and acceptable, careful consideration must be given to such things as ``return on investment'' and ``commercial product potential'' of the technologies developed. This integrated approach will win the Congressional support needed to secure the financial backing necessary to assure

  19. The Integration of the Fire Scout Tactical Unmanned Aerial System into Littoral Combat Ship Missions

    National Research Council Canada - National Science Library

    Marsh, James J

    2007-01-01

    ...) is an effective mission multiplier for the Littoral Combat Ship (LCS). The U.S. Navy relies heavily on unmanned systems, such as the Fire Scout UAS, to enable LCS to conduct several complex littoral missions...

  20. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  1. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  2. Defense Headquarters: Geographic Combatant Commands Rely on Subordinate Commands for Mission Management and Execution

    Science.gov (United States)

    2016-06-30

    Committee announced his priorities which included a review of DOD’s organization and lines of authority established as a result of the Goldwater...See enclosure). This report formally transmits an updated briefing and communicates the final results of our work. To describe DOD’s allocation of...its mission to manage the detention facility at Guantanamo Bay, Cuba to Joint Task Force Guantanamo (JTF-GTMO). However, the extent to which each

  3. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    1 janv. 2012 ... Integrated Natural Resource Management in the Highlands of Eastern Africa: ... goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  4. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2012-01-01

    Jan 1, 2012 ... Book cover Integrated Natural Resource Management in the ... with the common goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  5. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  6. Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

    Science.gov (United States)

    Sauerwein, Timothy A.; Gostomski, Tom

    2007-01-01

    The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all

  7. Development of an Integrated Countermeasure Device for Long Duration Space Flight and Exploration Missions

    Science.gov (United States)

    Lee, S. M. C.; Streeper, T.; Spiering, B. A.; Loehr, J. A.; Guilliams, M. E.; Bloomberg, J. J.; Mulavara, A. P.; Cavanagh, P. R.; Lang, T.

    2010-01-01

    Musculoskeletal, cardiovascular, and sensorimotor deconditioning have been observed consistently in astronauts and cosmonauts following long-duration spaceflight. Studies in bed rest, a spaceflight analog, have shown that high intensity resistive or aerobic exercise attenuates or prevents musculoskeletal and cardiovascular deconditioning, respectively, but complete protection has not been achieved during spaceflight. Exercise countermeasure hardware used during earlier International Space Station (ISS) missions included a cycle ergometer, a treadmill, and the interim resistive exercise device (iRED). Effectiveness of the countermeasures may have been diminished by limited loading characteristics of the iRED as well as speed restrictions and subject harness discomfort during treadmill exercise. The Advanced Resistive Exercise Device (ARED) and the second generation treadmill were designed to address many of the limitations of their predecessors, and anecdotal reports from ISS crews suggest that their conditioning is better preserved since the new hardware was delivered in 2009. However, several countermeasure devices to protect different physiologic systems will not be practical during exploration missions when the available volume and mass will be severely restricted. The combined countermeasure device (CCD) integrates a suite of hardware into one device intended to prevent spaceflight-induced musculoskeletal, cardiovascular, and sensorimotor deconditioning. The CCD includes pneumatic loading devices with attached cables for resistive exercise, a cycle for aerobic exercise, and a 6 degree of freedom motion platform for balance training. In a proof of concept test, ambulatory untrained subjects increased muscle strength (58%) as well as aerobic capacity (26%) after 12-weeks of exercise training with the CCD (without balance training), improvements comparable to those observed with traditional exercise training. These preliminary results suggest that this CCD can

  8. Reuniting the Solar System: Integrated Education and Public Outreach Projects for Solar System Exploration Missions and Programs

    Science.gov (United States)

    Lowes, Leslie; Lindstrom, Marilyn; Stockman, Stephanie; Scalice, Daniela; Klug, Sheri

    2003-01-01

    The Solar System Exploration Education Forum has worked for five years to foster Education and Public Outreach (E/PO) cooperation among missions and programs in order to leverage resources and better meet the needs of educators and the public. These efforts are coming together in a number of programs and products and in '2004 - The Year of the Solar System.' NASA's practice of having independent E/PO programs for each mission and its public affairs emphasis on uniqueness has led to a public perception of a fragmented solar system exploration program. By working to integrate solar system E/PO, the breadth and depth of the solar system exploration program is revealed. When emphasis is put on what missions have in common, as well as their differences, each mission is seen in the context of the whole program.

  9. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  10. Integrated nutrients management for 'desi' cotton

    International Nuclear Information System (INIS)

    Qazi, M.A.; Akram, M.; Ahmad, N.; Khattak, M.A.

    2007-01-01

    Intensive cropping with no return of crop residues and other organic inputs result in the loss of soil organic matter (SOM) and nutrient supply in (Desi) cotton-wheat cropping system in Pakistan. For appraisal of problem and finding solution to sustainability, we evaluated six treatments comprised of two fertilizer doses and three management techniques over a period of three years (2003-05) monitoring their effects on seed cotton yield and soil fertility. The techniques included chemical fertilizers, municipal solid waste manure (MSWM) integrated with chemical fertilizers in 1:4 ratios with, and without pesticides. The results revealed that cotton yields. Were enhanced by 19% due to site-specific fertilizer dose over conventional dose. Ignoring weeds control by means of herbicided application resulted in 5% decrease of seed cotton yield in IPNM technique positive effect of MSWM integration was noted on soil test phosphorus and SOM. Site-specific fertilizer application and integrated plant nutrient management by MSWM proved their suitability as the techniques not only improve soil quality in terms of sustained levels of organic matter and phosphorus but also provide a safe way of waste disposal. (author)

  11. Towards integrated catchment management, Whaingaroa, New Zealand.

    Science.gov (United States)

    van Roon, M; Knight, S

    2001-01-01

    The paper examines progress towards integrated catchment management and sustainable agriculture at Whaingaroa (Raglan), New Zealand. Application of the Canadian "Atlantic Coastal Action Program" model (ACAP) has been only partially successful within New Zealand's bicultural setting. Even before the introduction of the ACAP process there existed strong motivation and leadership by various sectors of the community. A merging of resource management planning and implementation processes of the larger community and that of the Maori community has not occurred. Research carried out by Crown Research Institutes has clearly shown the actions required to make pastoral farming more sustainable. There are difficulties in the transference to, and uptake of, these techniques by farmers. An examination of the socio-economic context is required. There has been a requirement on local government bodies to tighten their focus as part of recent reform. This has occurred concurrently with a widening of vision towards integrated and sustainable forms of management. This (as well as a clear belief in empowerment of local communities) has lead to Council reliance on voluntary labour. There is a need to account for the dynamic interaction between social and political history and the geological and biophysical history of the area. As part of a re-examination of sustainable development, New Zealand needs to reconcile the earning of the bulk of its foreign income from primary production, with the accelerating ecological deficit that it creates. A sustainability strategy is required linking consumer demand, property rights and responsibilities.

  12. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  13. Integrated Global Nuclear Materials Management Preliminary Concepts

    International Nuclear Information System (INIS)

    Jones, E; Dreicer, M.

    2006-01-01

    The world is at a turning point, moving away from the Cold War nuclear legacy towards a future global nuclear enterprise; and this presents a transformational challenge for nuclear materials management. Achieving safety and security during this transition is complicated by the diversified spectrum of threat 'players' that has greatly impacted nonproliferation, counterterrorism, and homeland security requirements. Rogue states and non-state actors no longer need self-contained national nuclear expertise, materials, and equipment due to availability from various sources in the nuclear market, thereby reducing the time, effort and cost for acquiring a nuclear weapon (i.e., manifestations of latency). The terrorist threat has changed the nature of military and national security requirements to protect these materials. An Integrated Global Nuclear Materials Management (IGNMM) approach would address the existing legacy nuclear materials and the evolution towards a nuclear energy future, while strengthening a regime to prevent nuclear weapon proliferation. In this paper, some preliminary concepts and studies of IGNMM will be presented. A systematic analysis of nuclear materials, activities, and controls can lead to a tractable, integrated global nuclear materials management architecture that can help remediate the past and manage the future. A systems approach is best suited to achieve multi-dimensional and interdependent solutions, including comprehensive, end-to-end capabilities; coordinated diverse elements for enhanced functionality with economy; and translation of goals/objectives or standards into locally optimized solutions. A risk-informed basis is excellent for evaluating system alternatives and performances, and it is especially appropriate for the security arena. Risk management strategies--such as defense-in-depth, diversity, and control quality--help to weave together various technologies and practices into a strong and robust security fabric. Effective

  14. Water management as a key component of integrated weed management

    Directory of Open Access Journals (Sweden)

    Antonio Berti

    2010-09-01

    Full Text Available Water management within the cropping system is a key factor for an integrated weed management. Soil moisture affects seed persistence and seed dormancy, thus influencing their germination, the establishment of seedlings as well as the competition at adult stage and the number, vitality and dormancy of the new seeds produced by the weeds. The interactions among water availability and competition are very complex and still not fully understood. A research effort in this sector should the be very relevant for the development of new approaches of weed management, such as “Ecological weed management”, aiming to reduce weed density and competitiveness and, in the medium term, to prevent undesired modifications of the weed flora.

  15. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  16. Rocket Testing and Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John

    2005-01-01

    Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

  17. Managing Climate Risk. Integrating Adaptation into World Bank Group Operations

    International Nuclear Information System (INIS)

    Van Aalst, M.

    2006-08-01

    Climate change is already taking place, and further changes are inevitable. Developing countries, and particularly the poorest people in these countries, are most at risk. The impacts result not only from gradual changes in temperature and sea level but also, in particular, from increased climate variability and extremes, including more intense floods, droughts, and storms. These changes are already having major impacts on the economic performance of developing countries and on the lives and livelihoods of millions of poor people around the world. Climate change thus directly affects the World Bank Group's mission of eradicating poverty. It also puts at risk many projects in a wide range of sectors, including infrastructure, agriculture, human health, water resources, and environment. The risks include physical threats to the investments, potential underperformance, and the possibility that projects will indirectly contribute to rising vulnerability by, for example, triggering investment and settlement in high-risk areas. The way to address these concerns is not to separate climate change adaptation from other priorities but to integrate comprehensive climate risk management into development planning, programs, and projects. While there is a great need to heighten awareness of climate risk in Bank work, a large body of experience on climate risk management is already available, in analytical work, in country dialogues, and in a growing number of investment projects. This operational experience highlights the general ingredients for successful integration of climate risk management into the mainstream development agenda: getting the right sectoral departments and senior policy makers involved; incorporating risk management into economic planning; engaging a wide range of nongovernmental actors (businesses, nongovernmental organizations, communities, and so on); giving attention to regulatory issues; and choosing strategies that will pay off immediately under current

  18. Strategic Environmental Assessment: Integrated environmental management

    CSIR Research Space (South Africa)

    Department of Environmental Affairs and Tourism

    2004-01-01

    Full Text Available stream_source_info Department of Environmental Affairs and Tourism_2004.pdf.txt stream_content_type text/plain stream_size 70155 Content-Encoding ISO-8859-1 stream_name Department of Environmental Affairs and Tourism_2004.pdf... and Tourism Other topics in the series of overview information documents on the concepts of, and approaches to, integrated environmental management are listed below. Further titles in this series are being prepared and will be made available periodically...

  19. FEMA's Integrated Emergency Management Information System (IEMIS)

    International Nuclear Information System (INIS)

    Jaske, R.T.; Meitzler, W.

    1987-01-01

    FEMA is implementing a computerized system for use in optimizing planning, and for supporting exercises of these plans. Called the Integrated Emergency Management Information System (IEMIS), it consists of a base geographic information system upon which analytical models are superimposed in order to load data and report results analytically. At present, it supports FEMA's work in offsite preparedness around nuclear power stations, but is being developed to deal with a full range of natural and technological accident hazards for which emergency evacuation or population movement is required

  20. Integrate offsites management with information systems

    Energy Technology Data Exchange (ETDEWEB)

    Valleur, M. (TECHNIP, Paris (France))

    1993-11-01

    Computerized offsites management systems in oil refineries offer a unique opportunity to integrate advanced technology into a coherent refinery information system that contributes to benefits-driven optimal operations: from long-term, multirefinery linear programming (LP) models to sequential control of transfer lineups in the tank farm. There are strong incentives to automate and optimize the offsites operations, and benefits can be quantified to justify properly sized projects. The paper discusses the following: business opportunities, oil movement and advanced technology, project scoping and sizing, review of functional requirements, transfer automation, blending optimal control, on-line analyzers, oil movement and scheduling, organizational issues, and investment and benefits analysis.

  1. Church, mission and reconstruction: Being a church with integrity in reconstruction discourse in post-colonial Zimbabwe

    Directory of Open Access Journals (Sweden)

    Canon B. Shambare

    2018-05-01

    Full Text Available The church in Africa, like its counterparts elsewhere in the world, is called to fulfil the mission of God as expressed in the call ‘Missio Dei’ and influentially remains with the integrity of the mission of Christ (Missio Christos, which is liberative and practical. For Christ was not only concerned with the spiritual needs of the people, but also with their material well-being. The following question therefore arises: how can the church in Africa, in general, and in Zimbabwe, in particular, actively do God’s mission and remain with integrity in the midst of the reality of suffering. Furthermore, how can the church for mission and reconstruction be understood in a post-colonial Zimbabwe given the contextual realities of political crises, corruption, poverty, moral decadence, defined or censored truth, leadership crises and no freedom of expression? This article argues that, although the church is faced with these arduous realities, it remains called by God to do God’s mission. While in post-colonial Zimbabwe the socio-political, socio-economic and socio-religious situation might seem hopeless, the church has remained vibrant and alive for reconstruction theology. The transformation of society is possible given the authority and mission mandate of the church. This article argues that the church is a key player in reconstruction theology and in the transformation of society. For transformation to be possible, the church should witness to the gospel of Christ without fear of being labelled, castrated and persecuted. The article asserts that the spirit of the Bible should be revived in a time of reconstruction in Zimbabwe. The assumption in this article is that Zimbabwe is ready for reconstruction discourse. For this to happen, the researchers argue that the church as a critical relevant player in reconstruction needs to ‘be church’ in its missional mandates. Integrity is essential if a church wants to be relevantly missional and

  2. Integrated solid waste management of Seattle, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Seattle, Washington, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  3. Integrated solid waste management of Minneapolis, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Minneapolis, Minnesota (Hennepin County) integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM system.

  4. Integrated solid waste management of Sevierville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Sevierville, Tennessee integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  5. Partnership - the heart of integrated outage management

    International Nuclear Information System (INIS)

    Robinson, F.T.

    1995-01-01

    Changes in the power generating industry continue apace. The effects of privatisation are widely visible: nowhere more so than in the growing national and international competition facing the generators around the world. A successful, long-term marriage between generator and contractor on power station outage management offers significant scope for cost reduction, shortening annual plant downtime and generating more megawatts, all within a safety environment of continuous improvement. Working in close partnership, Nuclear Electric and Rolls-Royce Nuclear Engineering Services have remodelled the whole contractor/client strategy. The new discipline, known as integrated outage management and partnering, is already producing shorter outage periods at Bradwell, a Magnox Station in Essex. (author)

  6. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  7. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Cohen, A.S. [CSI Resource Systems, Boston, MA (United States)

    1993-12-31

    The Japanese, through a combination of public policy, private market conditions, and geographic necessity, practice integrated municipal solid waste management as defined by the US Environmental Protection Agency. The Japanese have not defined a specific hierarchical preference for alternative waste management practices, i.e., waste reduction, reuse and recycling, combustion, composting, and landfill disposal. However, in marked contrast to the US approach, the Japanese system relies heavily on waste combustion, with and without energy recovery. {open_quotes}Discards{close_quotes}, as the term is used in this paper, refers to all materials considered used and spent by residential and commercial generators. That which is discarded (whether recyclable or nonrecyclable) by a municipality is referred to as MSW. This paper provides an overview of MSW management practices and private-sector recycling in Japan. Estimates of the total generation of residential and commercial discards and their disposition are also presented. Such an overview of Japanese practices can be used to assess the potential effectiveness of US integrated solid waste management programs. Of the estimated 61.3 to 72.1 million tons of residential and commercial discards generated in Japan during its 1989 fiscal year (April 1, 1989, through March 31, 1990), an estimated 55 to 64 percent was incinerated; 15 to 28 percent was recycled (only 2 to 3 percent through municipal recycling activities); less than 0.1 percent was composted or used as animal feed; and 17 to 20 percent was landfilled. Including ash disposal, 26 to 30 percent, by weight, of the gross discards were landfilled.

  8. Mars Exploration 2003 to 2013 - An Integrated Perspective: Time Sequencing the Missions

    Science.gov (United States)

    Briggs, G.; McKay, C.

    2000-01-01

    The science goals for the Mars exploration program, together with the HEDS precursor environmental and technology needs, serve as a solid starting point for re-planning the program in an orderly way. Most recently, the community has recognized the significance of subsurface sampling as a key component in "following the water". Accessing samples from hundreds and even thousands of meters beneath the surface is a challenge that will call for technology development and for one or more demonstration missions. Recent mission failures and concerns about the complexity of the previously planned MSR missions indicate that, before we are ready to undertake sample return and deep sampling, the Mars exploration program needs to include: 1) technology development missions; and 2) basic landing site assessment missions. These precursor missions should demonstrate the capability for reliable & accurate soft landing and in situ propellant production. The precursor missions will need to carry out close-up site observations, ground-penetrating radar mapping from orbit and conduct seismic surveys. Clearly the programs should be planned as a single, continuous exploration effort. A prudent minimum list of missions, including surface rovers with ranges of more than 10 km, can be derived from the numerous goals and requirements; they can be sequenced in an orderly way to ensure that time is available to feed forward the results of the precursor missions. One such sequence of missions is proposed for the decade beginning in 2003.

  9. Integrated water resources management using engineering measures

    Science.gov (United States)

    Huang, Y.

    2015-04-01

    The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  10. Integrated water resources management using engineering measures

    Directory of Open Access Journals (Sweden)

    Y. Huang

    2015-04-01

    Full Text Available The management process of Integrated Water Resources Management (IWRM consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation, are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  11. Managing Uncertainty for an Integrated Fishery

    Directory of Open Access Journals (Sweden)

    MB Hasan

    2012-06-01

    Full Text Available This paper investigates ways to deal with the uncertainties in fishing trawler scheduling and production planning in a quota-based integrated commercial fishery. A commercial fishery faces uncertainty mainly from variation in catch rate, which may be due to weather, and other environmental factors. The firm tries to manage this uncertainty through planning co-ordination of fishing trawler scheduling, catch quota, processing and labour allocation, and inventory control. Scheduling must necessarily be done over some finite planning horizon, and the trawler schedule itself introduces man-made variability, which in turn induces inventory in the processing plant. This induced inventory must be managed, complicated by the inability to plan easily beyond the current planning horizon. We develop a surprisingly simple innovation in inventory, which we have not seen in other papers on production management, which of requiring beginning inventory to equal ending inventory. This tool gives management a way to calculate a profit-maximizing safety stock that counter-acts the man-made variability due to the trawler scheduling. We found that the variability of catch rate had virtually no effects on the profitability with inventory. We report numerical results for several planning horizon models, based on data for a major New Zealand fishery.

  12. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  13. Waste Management Options for Long-Duration Space Missions: When to Reject, Reuse, or Recycle

    Science.gov (United States)

    Linne, Diane L.; Palaszewski, Bryan A.; Gokoglu, Suleyman; Gallo, Christopher A.; Balasubramaniam, Ramaswamy; Hegde, Uday G.

    2014-01-01

    The amount of waste generated on long-duration space missions away from Earth orbit creates the daunting challenge of how to manage the waste through reuse, rejection, or recycle. The option to merely dispose of the solid waste through an airlock to space was studied for both Earth-moon libration point missions and crewed Mars missions. Although the unique dynamic characteristics of an orbit around L2 might allow some discarded waste to intersect the lunar surface before re-impacting the spacecraft, the large amount of waste needed to be managed and potential hazards associated with volatiles recondensing on the spacecraft surfaces make this option problematic. A second option evaluated is to process the waste into useful gases to be either vented to space or used in various propulsion systems. These propellants could then be used to provide the yearly station-keeping needs at an L2 orbit, or if processed into oxygen and methane propellants, could be used to augment science exploration by enabling lunar mini landers to the far side of the moon.

  14. Data Management Coordinators Monitor STS-78 Mission at the Huntsville Operations Support Center

    Science.gov (United States)

    1996-01-01

    Launched on June 20, 1996, the STS-78 mission's primary payload was the Life and Microgravity Spacelab (LMS), which was managed by the Marshall Space Flight Center (MSFC). During the 17 day space flight, the crew conducted a diverse slate of experiments divided into a mix of life science and microgravity investigations. In a manner very similar to future International Space Station operations, LMS researchers from the United States and their European counterparts shared resources such as crew time and equipment. Five space agencies (NASA/USA, European Space Agency/Europe (ESA), French Space Agency/France, Canadian Space Agency /Canada, and Italian Space Agency/Italy) along with research scientists from 10 countries worked together on the design, development and construction of the LMS. This photo represents Data Management Coordinators monitoring the progress of the mission at the Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at MSFC. Pictured are assistant mission scientist Dr. Dalle Kornfeld, Rick McConnel, and Ann Bathew.

  15. A prototype case-based reasoning human assistant for space crew assessment and mission management

    Science.gov (United States)

    Owen, Robert B.; Holland, Albert W.; Wood, Joanna

    1993-01-01

    We present a prototype human assistant system for space crew assessment and mission management. Our system is based on case episodes from American and Russian space missions and analog environments such as polar stations and undersea habitats. The general domain of small groups in isolated and confined environments represents a near ideal application area for case-based reasoning (CBR) - there are few reliable rules to follow, and most domain knowledge is in the form of cases. We define the problem domain and outline a unique knowledge representation system driven by conflict and communication triggers. The prototype system is able to represent, index, and retrieve case studies of human performance. We index by social, behavioral, and environmental factors. We present the problem domain, our current implementation, our research approach for an operational system, and prototype performance and results.

  16. Climate change and integrated water resources management

    International Nuclear Information System (INIS)

    Bhuiyan, Nurul Amin

    2007-01-01

    Full text: Full text: In the Bangladesh Poverty Reduction Strategy (PRSP), Millennium Development Goals and other donor driven initiatives, two vital areas linked with poverty and ecosystem survival seem to be either missing or are being neglected: (a) transboundary water use and (b) coastal area poverty and critical ecosystems vulnerable due to climate change. Since the World Summit on Sustainable Development (WSSD) goals and PRSP are integrated, it is necessary that the countrys WSSD goals and PRSP should also be in harmony. All should give the recognition of Ganges Brahmaputra and Meghna as international basins and the approach should be taken for regional sustainable and integrated water resource management involving all co-riparian countries. The principle of low flow in the international rivers during all seasons should be ensured. All stakeholders should have a say and work towards regional cooperation in the water sector as a top priority. The energy sector should be integrated with water. The Indian River Linking project involving international rivers should be seriously discussed at all levels including the parliament so that voice of Bangladesh is concerted and information shared by all concerned. One of the most critical challenges Bangladesh faces is the management of water resources during periods of water excesses and acute scarcity. It is particularly difficult when only 7% of the catchments areas of the very international rivers, the Ganges, the Brahmaputra and the Meghna are in Bangladesh while 97% is outside Bangladesh where unfortunately, Bangladesh has no control on upstream diversion and water use. The UN Conference on Environment and Development in its Agenda 21 emphasizes the importance of Integrated Water Resource Management (IWRM). The core point of IWRM is that is development of all aspects of entire basin in a basin wide approach, that all relevant agencies of the government and water users must be involved in the planning process and

  17. Mission Analysis for Using Preventive Radiological/Nuclear Detection Equipment for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, Brooke R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wood-Zika, Annmarie R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Haynes, Daniel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Klemic, Gladys A. [US Dept. of Homeland Security National Urban Security Technology Lab., Manhattan, NY (United States); Musolino, Stephen V. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fielded radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.

  18. M109 Family of Vehicles, Paladin Integrated Management (PIM): Operational Assessment of the Initial Operational Test and Evaluation (IOT and E)

    Science.gov (United States)

    2017-01-01

    Director, Operational Test and Evaluation M109 Family of Vehicles, Paladin Integrated Management (PIM) Operational Assessment of the... operational suitability, test adequacy, and survivability of the M109 Family of Vehicles (FoV), known as Paladin Integrated Management (PIM) Self...prevent the M109A7 SPH-equipped unit from completing its mission. The Paladin Integrated Management (PIM) Initial Operational Test and Evaluation

  19. A critical review of the life sciences project management at Ames Research Center for the Spacelab Mission development test 3

    Science.gov (United States)

    Helmreich, R. L.; Wilhelm, J. M.; Tanner, T. A.; Sieber, J. E.; Burgenbauch, S. F.

    1979-01-01

    A management study was initiated by ARC (Ames Research Center) to specify Spacelab Mission Development Test 3 activities and problems. This report documents the problems encountered and provides conclusions and recommendations to project management for current and future ARC life sciences projects. An executive summary of the conclusions and recommendations is provided. The report also addresses broader issues relevant to the conduct of future scientific missions under the constraints imposed by the space environment.

  20. Integrated Space Asset Management Database and Modeling

    Science.gov (United States)

    MacLeod, Todd; Gagliano, Larry; Percy, Thomas; Mason, Shane

    2015-01-01

    Effective Space Asset Management is one key to addressing the ever-growing issue of space congestion. It is imperative that agencies around the world have access to data regarding the numerous active assets and pieces of space junk currently tracked in orbit around the Earth. At the center of this issues is the effective management of data of many types related to orbiting objects. As the population of tracked objects grows, so too should the data management structure used to catalog technical specifications, orbital information, and metadata related to those populations. Marshall Space Flight Center's Space Asset Management Database (SAM-D) was implemented in order to effectively catalog a broad set of data related to known objects in space by ingesting information from a variety of database and processing that data into useful technical information. Using the universal NORAD number as a unique identifier, the SAM-D processes two-line element data into orbital characteristics and cross-references this technical data with metadata related to functional status, country of ownership, and application category. The SAM-D began as an Excel spreadsheet and was later upgraded to an Access database. While SAM-D performs its task very well, it is limited by its current platform and is not available outside of the local user base. Further, while modeling and simulation can be powerful tools to exploit the information contained in SAM-D, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. This paper provides a summary of SAM-D development efforts to date and outlines a proposed data management infrastructure that extends SAM-D to support the larger data sets to be generated. A service-oriented architecture model using an information sharing platform named SIMON will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for

  1. Management experience of an international venture in space The Ulysses mission

    Science.gov (United States)

    Yoshida, Ronald Y.; Meeks, Willis G.

    1986-01-01

    The management of the Ulysses project, a probe which will fly a solar polar orbit, is described. The 5-yr mission will feature a flyby of Jupiter to deflect the spacecraft into a high-inclination orbit. Data on the solar corona, solar wind, the sun-wind interface, the heliospheric magnetic field, solar and nonsolar cosmic rays, etc., will be gathered as a function of the solar latitude. NASA will track and control the probe with the Deep Space Network. JPL provides project management for NASA while the Directorate of Scientific Programs performs ESA management functions. The DOE will provide a radioisotope thermoelectric generator while NASA and ESA each supply half the scientific payload. A NASA-ESA Joint Working Group meets about twice per year to monitor the project and discuss the technical and scientific requirements. Safety issues and measures which are being addressed due to the presence of the Pu-238 heat source for the RTG are discussed.

  2. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  3. Mission management, planning, and cost: PULSE Attitude And Control Systems (AACS)

    Science.gov (United States)

    1990-01-01

    The Pluto unmanned long-range scientific explorer (PULSE) is a probe that will do a flyby of Pluto. It is a low weight, relatively low costing vehicle which utilizes mostly off-the-shelf hardware, but not materials or techniques that will be available after 1999. A design, fabrication, and cost analysis is presented. PULSE will be launched within the first decade of the twenty-first century. The topics include: (1) scientific instrumentation; (2) mission management, planning, and costing; (3) power and propulsion systems; (4) structural subsystem; (5) command, control, and communication; and (6) attitude and articulation control.

  4. Modeling Constellation Virtual Missions Using the Vdot(Trademark) Process Management Tool

    Science.gov (United States)

    Hardy, Roger; ONeil, Daniel; Sturken, Ian; Nix, Michael; Yanez, Damian

    2011-01-01

    The authors have identified a software tool suite that will support NASA's Virtual Mission (VM) effort. This is accomplished by transforming a spreadsheet database of mission events, task inputs and outputs, timelines, and organizations into process visualization tools and a Vdot process management model that includes embedded analysis software as well as requirements and information related to data manipulation and transfer. This paper describes the progress to date, and the application of the Virtual Mission to not only Constellation but to other architectures, and the pertinence to other aerospace applications. Vdot s intuitive visual interface brings VMs to life by turning static, paper-based processes into active, electronic processes that can be deployed, executed, managed, verified, and continuously improved. A VM can be executed using a computer-based, human-in-the-loop, real-time format, under the direction and control of the NASA VM Manager. Engineers in the various disciplines will not have to be Vdot-proficient but rather can fill out on-line, Excel-type databases with the mission information discussed above. The author s tool suite converts this database into several process visualization tools for review and into Microsoft Project, which can be imported directly into Vdot. Many tools can be embedded directly into Vdot, and when the necessary data/information is received from a preceding task, the analysis can be initiated automatically. Other NASA analysis tools are too complex for this process but Vdot automatically notifies the tool user that the data has been received and analysis can begin. The VM can be simulated from end-to-end using the author s tool suite. The planned approach for the Vdot-based process simulation is to generate the process model from a database; other advantages of this semi-automated approach are the participants can be geographically remote and after refining the process models via the human-in-the-loop simulation, the

  5. Integrated Work Management: FOD/RLM, Course 31882

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300, Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.

  6. Managing racial integration in South African public schools: In ...

    African Journals Online (AJOL)

    The paper explores what racial integration is. Furthermore, it scrutinises how racial integration is currently managed in South African Public schools. The main argument of the paper defends a deliberative conception of managing racial integration in South African public schools. In light of this, there is some form of hope to ...

  7. Integrated vector management: the Zambian experience.

    Science.gov (United States)

    Chanda, Emmanuel; Masaninga, Fred; Coleman, Michael; Sikaala, Chadwick; Katebe, Cecilia; Macdonald, Michael; Baboo, Kumar S; Govere, John; Manga, Lucien

    2008-08-27

    The Zambian Malaria Control Programme with the Roll Back Malaria (RBM) partners have developed the current National Malaria Strategic Plan (NMSP 2006-2011) which focuses on prevention based on the Integrated Vector Management (IVM) strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO) steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  8. Integrated pest management of "Golden Delicious" apples.

    Science.gov (United States)

    Simončič, A; Stopar, M; Velikonja Bolta, Š; Bavčar, D; Leskovšek, R; Baša Česnik, H

    2015-01-01

    Monitoring of plant protection product (PPP) residues in "Golden Delicious" apples was performed in 2011-2013, where 216 active substances were analysed with three analytical methods. Integrated pest management (IPM) production and improved IPM production were compared. Results were in favour of improved IPM production. Some active compounds determined in IPM production (boscalid, pyraclostrobin, thiacloprid and thiametoxam) were not found in improved IPM production. Besides that, in 2011 and 2012, captan residues were lower in improved IPM production. Risk assessment was also performed. Chronic exposure of consumers was low in general, but showed no major differences for IPM and improved IPM production for active substances determined in both types of production. Analytical results were compared with the European Union report of 2010 where 1.3% of apple samples exceeded maximum residue levels (MRLs), while MRL exceedances were not observed in this survey.

  9. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  10. Integrated solid waste management of Scottsdale, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the city of Scottsdale, Arizona, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. The document reports actual data from records kept by participants. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may per-form manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption, for a 1-year period, of an operating IMSWM system. The report is organized into two main parts. The first part is the executive summary and case study portion of the report. The executive summary provides a basic description of the study area and selected economic and energy information. Within the case study are detailed descriptions of each component operating during the study period; the quantities of solid waste collected, processed, and marketed within the study boundaries; the cost of MSW in Scottsdale; an energy usage analysis; a review of federal, state, and local environmental requirement compliance; a reference section; and a glossary of terms. The second part of the report focuses on a more detailed discourse on the above topics. In addition, the methodology used to determine the economic costs and energy consumption of the system components is found in the second portion of this report. The methodology created for this project will be helpful for those professionals who wish to break out the costs of their own integrated systems.

  11. Energy efficiency through integrated environmental management.

    Science.gov (United States)

    Benromdhane, Souad Ahmed

    2015-05-01

    Integrated environmental management became an economic necessity after industrial development proved to be unsustainable without consideration of environmental direct and indirect impacts. Energy dependency and air pollution along with climate change grew into major challenges facing developed and developing countries alike. Thus, a new global market structure emerged and changed the way we do trade. The search intensified for alternatives to petroleum. However, scientists, policy makers, and environmental activists agreed to focus on strategic conservation and optimization of energy use. Environmental concerns will remain partially unaddressed with the current pace of consumption because greenhouse gas emissions will continue to rise with economic growth. This paper discusses energy efficiency, steady integration of alternative sources, and increased use of best available technologies. Energy criteria developed for environmental labeling certification are presented. Our intention is to encourage manufacturers and service providers to supply consumers with less polluting and energy-consuming goods and services, inform consumers of the environmental and energy impacts, and thereby instill sustainable and responsible consumption. As several programs were initiated in developed countries, environmental labeling requirements created barriers to many exports manufactured in developing countries, affecting current world trade and putting more pressure on countries to meet those requirements. Defining an institutional and legal framework of environmental labeling is a key challenge in implementing such programs for critical economic sectors like tourism, textiles, and food production where energy needs are the most important aspect to control. A case study of Tunisia and its experience with eco-labeling is presented.

  12. Integrated remotely sensed datasets for disaster management

    Science.gov (United States)

    McCarthy, Timothy; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-10-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North America's NTSC and European SECAM and PAL television systems that are then recorded using various video formats. This technology has recently being employed as a front-line, remote sensing technology for damage assessment post-disaster. This paper traces the development of spatial video as a remote sensing tool from the early 1980s to the present day. The background to a new spatial-video research initiative based at National University of Ireland, Maynooth, (NUIM) is described. New improvements are proposed and include; low-cost encoders, easy to use software decoders, timing issues and interoperability. These developments will enable specialists and non-specialists collect, process and integrate these datasets within minimal support. This integrated approach will enable decision makers to access relevant remotely sensed datasets quickly and so, carry out rapid damage assessment during and post-disaster.

  13. MAST's Integrated Data Access Management system: IDAM

    International Nuclear Information System (INIS)

    Muir, D.G.; Appel, L.; Conway, N.J.; Kirk, A.; Martin, R.; Meyer, H.; Storrs, J.; Taylor, D.; Thomas-Davies, N.; Waterhouse, J.

    2008-01-01

    A new Integrated Data Access Management system, IDAM, has been created to address specific data management issues of the MAST spherical Tokamak. For example, this system enables access to numerous file formats, both legacy and modern (IDA, Ufile, netCDF, HDF5, MDSPlus, PPF, JPF). It adds data quality values at the signal level, and automatically corrects for problems in data: in timings, calibrations, and labelling. It also builds new signals from signal components. The IDAM data server uses a hybrid XML-relational database to record how data are accessed, whether locally or remotely, and how alias and generic signal names are mapped to true names. Also, XML documents are used to encode the details of data corrections, as well as definitions of composite signals and error models. The simple, user friendly, API and accessor function library, written in C on Linux, is available for applications in C, C++, IDL and Fortran-90/95/2003 with good performance: a MAST plasma current trace (28 kbytes of data), requested using a generic name and with data corrections applied, is delivered over a 100 Mbit/s network in ∼13 ms

  14. Developing a Fault Management Guidebook for Nasa's Deep Space Robotic Missions

    Science.gov (United States)

    Fesq, Lorraine M.; Jacome, Raquel Weitl

    2015-01-01

    NASA designs and builds systems that achieve incredibly ambitious goals, as evidenced by the Curiosity rover traversing on Mars, the highly complex International Space Station orbiting our Earth, and the compelling plans for capturing, retrieving and redirecting an asteroid into a lunar orbit to create a nearby a target to be investigated by astronauts. In order to accomplish these feats, the missions must be imbued with sufficient knowledge and capability not only to realize the goals, but also to identify and respond to off-nominal conditions. Fault Management (FM) is the discipline of establishing how a system will respond to preserve its ability to function even in the presence of faults. In 2012, NASA released a draft FM Handbook in an attempt to coalesce the field by establishing a unified terminology and a common process for designing FM mechanisms. However, FM approaches are very diverse across NASA, especially between the different mission types such as Earth orbiters, launch vehicles, deep space robotic vehicles and human spaceflight missions, and the authors were challenged to capture and represent all of these views. The authors recognized that a necessary precursor step is for each sub-community to codify its FM policies, practices and approaches in individual, focused guidebooks. Then, the sub-communities can look across NASA to better understand the different ways off-nominal conditions are addressed, and to seek commonality or at least an understanding of the multitude of FM approaches. This paper describes the development of the "Deep Space Robotic Fault Management Guidebook," which is intended to be the first of NASA's FM guidebooks. Its purpose is to be a field-guide for FM practitioners working on deep space robotic missions, as well as a planning tool for project managers. Publication of this Deep Space Robotic FM Guidebook is expected in early 2015. The guidebook will be posted on NASA's Engineering Network on the FM Community of Practice

  15. The PDS-based Data Processing, Archiving and Management Procedures in Chang'e Mission

    Science.gov (United States)

    Zhang, Z. B.; Li, C.; Zhang, H.; Zhang, P.; Chen, W.

    2017-12-01

    PDS is adopted as standard format of scientific data and foundation of all data-related procedures in Chang'e mission. Unlike the geographically distributed nature of the planetary data system, all procedures of data processing, archiving, management and distribution are proceeded in the headquarter of Ground Research and Application System of Chang'e mission in a centralized manner. The RAW data acquired by the ground stations is transmitted to and processed by data preprocessing subsystem (DPS) for the production of PDS-compliant Level 0 Level 2 data products using established algorithms, with each product file being well described using an attached label, then all products with the same orbit number are put together into a scheduled task for archiving along with a XML archive list file recoding all product files' properties such as file name, file size etc. After receiving the archive request from DPS, data management subsystem (DMS) is provoked to parse the XML list file to validate all the claimed files and their compliance to PDS using a prebuilt data dictionary, then to exact metadata of each data product file from its PDS label and the fields of its normalized filename. Various requirements of data management, retrieving, distribution and application can be well met using the flexible combination of the rich metadata empowered by the PDS. In the forthcoming CE-5 mission, all the design of data structure and procedures will be updated from PDS version 3 used in previous CE-1, CE-2 and CE-3 missions to the new version 4, the main changes would be: 1) a dedicated detached XML label will be used to describe the corresponding scientific data acquired by the 4 instruments carried, the XML parsing framework used in archive list validation will be reused for the label after some necessary adjustments; 2) all the image data acquired by the panorama camera, landing camera and lunar mineralogical spectrometer should use an Array_2D_Image/Array_3D_Image object to store

  16. Integrated Traffic Flow Management Decision Making

    Science.gov (United States)

    Grabbe, Shon R.; Sridhar, Banavar; Mukherjee, Avijit

    2009-01-01

    A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

  17. Integrated NPP life cycle management - Agency's approach

    International Nuclear Information System (INIS)

    Gueorguiev, B.

    2002-01-01

    Full text: The number of nuclear power plants (NPPs) operating in the world has been roughly constant for the past seven years. There are 438 reactors of 353,489 MW(e) capacity in the world and they generated 2448.9 TWh in 2001 giving a total world operating experience with nuclear power of 10,363 years. About 230 units have reached already over 15 years of operation and significant number of these plants are fully depreciated. Share of nuclear power in electricity production sector in Member States utilising nuclear power plants represents a meaningful amount and in 14 countries it exceeds 30%. Therefore, a loss of this share should be covered by new installed capacities either from conventional or alternative sources of electricity generation. Recent forecasts, for nuclear power use over the next two decades range from ∼350 to ∼500 GW(e) worldwide. While assessing the need for any nuclear power related programmes there are several important factors that must be considered since even 350 GW(e) is a very large programme requiring several hundred thousand highly qualified personnel and a substantial infrastructure to assure its continued safe, reliable and cost-effective operation. It is important to assure reliable, safe and economic beneficial performance of the plant, which requires in turn an appropriated management of any activity connected with any taken period of a plant life starting from design and ending by the decided mode of decommissioning. The period between the first and the last payment for the activities connected with the existence of a plant could be defined as a life cycle of the plant. Such integrated approach requires considering the life cycle of the plant in a much broader sense than just operational life and is characterized by the variety of activities and their management represents in a whole a plant life management programme (PLIM). Therefore PLIM could be defined as an aggregate (totality) of technical, financial, economical and

  18. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2

    Energy Technology Data Exchange (ETDEWEB)

    PARSONS, J.E.

    2000-07-15

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  19. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    CERN Document Server

    Parsons, J E

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  20. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    International Nuclear Information System (INIS)

    PARSONS, J.E.

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented

  1. Integrated vector management for malaria control

    Directory of Open Access Journals (Sweden)

    Impoinvil Daniel E

    2008-12-01

    Full Text Available Abstract Integrated vector management (IVM is defined as "a rational decision-making process for the optimal use of resources for vector control" and includes five key elements: 1 evidence-based decision-making, 2 integrated approaches 3, collaboration within the health sector and with other sectors, 4 advocacy, social mobilization, and legislation, and 5 capacity-building. In 2004, the WHO adopted IVM globally for the control of all vector-borne diseases. Important recent progress has been made in developing and promoting IVM for national malaria control programmes in Africa at a time when successful malaria control programmes are scaling-up with insecticide-treated nets (ITN and/or indoor residual spraying (IRS coverage. While interventions using only ITNs and/or IRS successfully reduce transmission intensity and the burden of malaria in many situations, it is not clear if these interventions alone will achieve those critical low levels that result in malaria elimination. Despite the successful employment of comprehensive integrated malaria control programmes, further strengthening of vector control components through IVM is relevant, especially during the "end-game" where control is successful and further efforts are required to go from low transmission situations to sustained local and country-wide malaria elimination. To meet this need and to ensure sustainability of control efforts, malaria control programmes should strengthen their capacity to use data for decision-making with respect to evaluation of current vector control programmes, employment of additional vector control tools in conjunction with ITN/IRS tactics, case-detection and treatment strategies, and determine how much and what types of vector control and interdisciplinary input are required to achieve malaria elimination. Similarly, on a global scale, there is a need for continued research to identify and evaluate new tools for vector control that can be integrated with

  2. Model-based system engineering approach for the Euclid mission to manage scientific and technical complexity

    Science.gov (United States)

    Lorenzo Alvarez, Jose; Metselaar, Harold; Amiaux, Jerome; Saavedra Criado, Gonzalo; Gaspar Venancio, Luis M.; Salvignol, Jean-Christophe; Laureijs, René J.; Vavrek, Roland

    2016-08-01

    In the last years, the system engineering field is coming to terms with a paradigm change in the approach for complexity management. Different strategies have been proposed to cope with highly interrelated systems, system of systems and collaborative system engineering have been proposed and a significant effort is being invested into standardization and ontology definition. In particular, Model Based System Engineering (MBSE) intends to introduce methodologies for a systematic system definition, development, validation, deployment, operation and decommission, based on logical and visual relationship mapping, rather than traditional 'document based' information management. The practical implementation in real large-scale projects is not uniform across fields. In space science missions, the usage has been limited to subsystems or sample projects with modeling being performed 'a-posteriori' in many instances. The main hurdle for the introduction of MBSE practices in new projects is still the difficulty to demonstrate their added value to a project and whether their benefit is commensurate with the level of effort required to put them in place. In this paper we present the implemented Euclid system modeling activities, and an analysis of the benefits and limitations identified to support in particular requirement break-down and allocation, and verification planning at mission level.

  3. Weather information integration in transportation management center (TMC) operations.

    Science.gov (United States)

    2011-01-02

    This report presents the results of the third phase of an on-going FHWA study on weather integration in Transportation Management Center (TMC) operations. The report briefly describes the earlier phases of the integration study, summarizes the findin...

  4. A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

    Science.gov (United States)

    Trevino, Luis; Johnson, Stephen B.; Patterson, Jonathan; Teare, David

    2015-01-01

    The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S

  5. integrated identity and integrated identity and access management

    African Journals Online (AJOL)

    eobe

    Management System (T-IAMS) is a fingerprint biometric database that centrally manages students' identity, course a fingerprint ... registration, library and medical services information. .... based application and a web-based application.

  6. The Integrated Medical Model - Optimizing In-flight Space Medical Systems to Reduce Crew Health Risk and Mission Impacts

    Science.gov (United States)

    Kerstman, Eric; Walton, Marlei; Minard, Charles; Saile, Lynn; Myers, Jerry; Butler, Doug; Lyengar, Sriram; Fitts, Mary; Johnson-Throop, Kathy

    2009-01-01

    The Integrated Medical Model (IMM) is a decision support tool used by medical system planners and designers as they prepare for exploration planning activities of the Constellation program (CxP). IMM provides an evidence-based approach to help optimize the allocation of in-flight medical resources for a specified level of risk within spacecraft operational constraints. Eighty medical conditions and associated resources are represented in IMM. Nine conditions are due to Space Adaptation Syndrome. The IMM helps answer fundamental medical mission planning questions such as What medical conditions can be expected? What type and quantity of medical resources are most likely to be used?", and "What is the probability of crew death or evacuation due to medical events?" For a specified mission and crew profile, the IMM effectively characterizes the sequence of events that could potentially occur should a medical condition happen. The mathematical relationships among mission and crew attributes, medical conditions and incidence data, in-flight medical resources, potential clinical and crew health end states are established to generate end state probabilities. A Monte Carlo computational method is used to determine the probable outcomes and requires up to 25,000 mission trials to reach convergence. For each mission trial, the pharmaceuticals and supplies required to diagnose and treat prevalent medical conditions are tracked and decremented. The uncertainty of patient response to treatment is bounded via a best-case, worst-case, untreated case algorithm. A Crew Health Index (CHI) metric, developed to account for functional impairment due to a medical condition, provides a quantified measure of risk and enables risk comparisons across mission scenarios. The use of historical in-flight medical data, terrestrial surrogate data as appropriate, and space medicine subject matter expertise has enabled the development of a probabilistic, stochastic decision support tool capable of

  7. The integrity management cycle as a business process

    Energy Technology Data Exchange (ETDEWEB)

    Ackhurst, Trent B.; Peverelli, Romina P. [PIMS - Pipeline Integrity Management Specialists of London Ltd. (United Kingdom).

    2009-07-01

    It is a best-practice Oil and Gas pipeline integrity and reliability technique to apply integrity management cycles. This is conforms to the business principles of continuous improvement. This paper examines the integrity management cycle - both goals and objectives and subsequent component steps - from a business perspective. Traits that businesses require, to glean maximum benefit from such a cycle, are highlighted. A case study focuses upon an integrity and reliability process developed to apply to pipeline operators. installations. This is compared and contrasted to the pipeline integrity management cycle to underline both cycles. consistency with the principles of continuous improvement. (author)

  8. Integrated Weed Management Strategies for Control of Hydrilla

    National Research Council Canada - National Science Library

    Nelson, Linda S; Shearer, Judy F

    2009-01-01

    ...), and the fungal pathogen Mycoleptodiscus terrestris (Gerd.) Ostazeski, applied alone and in combination with one another, as an integrated weed management strategy against the nuisance aquatic plant, hydrilla...

  9. Integrated waste management - Looking beyond the solid waste horizon

    International Nuclear Information System (INIS)

    Seadon, J.K.

    2006-01-01

    Waste as a management issue has been evident for over four millennia. Disposal of waste to the biosphere has given way to thinking about, and trying to implement, an integrated waste management approach. In 1996 the United Nations Environmental Programme (UNEP) defined 'integrated waste management' as 'a framework of reference for designing and implementing new waste management systems and for analysing and optimising existing systems'. In this paper the concept of integrated waste management as defined by UNEP is considered, along with the parameters that constitute integrated waste management. The examples used are put into four categories: (1) integration within a single medium (solid, aqueous or atmospheric wastes) by considering alternative waste management options (2) multi-media integration (solid, aqueous, atmospheric and energy wastes) by considering waste management options that can be applied to more than one medium (3) tools (regulatory, economic, voluntary and informational) and (4) agents (governmental bodies (local and national), businesses and the community). This evaluation allows guidelines for enhancing success: (1) as experience increases, it is possible to deal with a greater complexity; and (2) integrated waste management requires a holistic approach, which encompasses a life cycle understanding of products and services. This in turn requires different specialisms to be involved in the instigation and analysis of an integrated waste management system. Taken together these advance the path to sustainability

  10. Integrating research with management: The case of Katavi National ...

    African Journals Online (AJOL)

    Integrating research with management: The case of Katavi National Park, Tanzania. ... national park: (i) reduced water flow caused by local damming of the Katuma River, ... to both management and policy makers for tackling these problems.

  11. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  12. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  13. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  14. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  15. Integrated Climate Smart Flood Management for Accra, Ghana ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · What we do ... The research team will use evidence to develop an integrated climate smart flood management framework to support policymaking. ... The Ministry of Environment, Science, Technology, and Innovation will manage the ...

  16. INTEGRATED WATERSHED MANAGEMENT: PRINCIPLES AND PRACTICE. Book Review

    Science.gov (United States)

    Through a wide range of information and topics, Integrated Watershed Management Principles and Practice shows how involved the watershed management planning process can be. The book is informative, and the author obviously has researched the subject thoroughly. The book's case...

  17. Integrated solid waste management: a palliative to existing waste ...

    African Journals Online (AJOL)

    As a concept, Integrated Solid Waste Management (ISWM) is a sustainable ... on the perspective of consumers on waste generation, collection and disposal. ... to effective solid waste management in the case study area; non-sorting and ...

  18. Roots Air Management System with Integrated Expander

    Energy Technology Data Exchange (ETDEWEB)

    Stretch, Dale [Eaton Corporation, Menomonee Falls, WI (United States); Wright, Brad [Eaton Corporation, Menomonee Falls, WI (United States); Fortini, Matt [Eaton Corporation, Menomonee Falls, WI (United States); Fink, Neal [Ballard Power Systems, Burnaby, BC (Canada); Ramadan, Bassem [Kettering Univ., Flint, MI (United States); Eybergen, William [Eaton Corporation, Menomonee Falls, WI (United States)

    2016-07-06

    PEM fuel cells remain an emerging technology in the vehicle market with several cost and reliability challenges that must be overcome in order to increase market penetration and acceptance. The DOE has identified the lack of a cost effective, reliable, and efficient air supply system that meets the operational requirements of a pressurized PEM 80kW fuel cell as one of the major technological barriers that must be overcome. This project leveraged Roots positive displacement development advancements and demonstrated an efficient and low cost fuel cell air management system. Eaton built upon its P-Series Roots positive displacement design and shifted the peak efficiency making it ideal for use on an 80kW PEM stack. Advantages to this solution include: • Lower speed of the Roots device eliminates complex air bearings present on other systems. • Broad efficiency map of Roots based systems provides an overall higher drive cycle fuel economy. • Core Roots technology has been developed and validated for other transportation applications. Eaton modified their novel R340 Twin Vortices Series (TVS) Roots-type supercharger for this application. The TVS delivers more power and better fuel economy in a smaller package as compared to other supercharger technologies. By properly matching the helix angle with the rotor’s physical aspect ratio, the supercharger’s peak efficiency can be moved to the operating range where it is most beneficial for the application. The compressor was designed to meet the 90 g/s flow at a pressure ratio of 2.5, similar in design to the P-Series 340. A net shape plastic expander housing with integrated motor and compressor was developed to significantly reduce the cost of the system. This integrated design reduced part count by incorporating an overhung expander and motor rotors into the design such that only four bearings and two shafts were utilized.

  19. The need for integrated off-shore, real-time information and management systems

    Energy Technology Data Exchange (ETDEWEB)

    Morley, L W

    1981-07-01

    Integrated planning, in which data from ships, aircraft, data buoys, and shore or satellite-borne radar are used for ocean surveillance is urged. The Atlantic coast of Canada is used as an example of the inefficiency of current management methods. Traffic control, search and rescue missions, pollution control, weather forecasting, and fisheries management are directed by separate government agencies, each with its own information system. A coordinated approach would reduce waste and allow full advantage to be taken of technological developments, e.g., satellites, unknown when the agencies were created.

  20. Integrated Water Resources Management: A Global Review

    Science.gov (United States)

    Srinivasan, V.; Cohen, M.; Akudago, J.; Keith, D.; Palaniappan, M.

    2011-12-01

    The diversity of water resources endowments and the societal arrangements to use, manage, and govern water makes defining a single paradigm or lens through which to define, prioritize and evaluate interventions in the water sector particularly challenging. Integrated Water Resources Management (IWRM) emerged as the dominant intervention paradigm for water sector interventions in the early 1990s. Since then, while many successful implementations of IWRM have been demonstrated at the local, basin, national and trans-national scales, IWRM has also been severely criticized by the global water community as "having a dubious record that has never been comprehensively analyzed", "curiously ambiguous", and "ineffective at best and counterproductive at worst". Does IWRM hold together as a coherent paradigm or is it a convenient buzzword to describe a diverse collection of water sector interventions? We analyzed 184 case study summaries of IWRM interventions on the Global Water Partnership (GWP) website. The case studies were assessed to find the nature, scale, objectives and outcomes of IWRM. The analysis does not suggest any coherence in IWRM as a paradigm - but does indicate distinct regional trends in IWRM. First, IWRM was done at very different scales in different regions. In Africa two-thirds of the IWRM interventions involved creating national or transnational organizations. In contrast, in Asia and South America, almost two-thirds were watershed, basin, or local body initiatives. Second, IWRM interventions involved very different types of activities in different regions. In Africa and Europe, IWRM entailed creation of policy documents, basin plans and institution building. In contrast, in Asia and Latin America the interventions were much more likely to entail new technology, infrastructure or watershed measures. In Australia, economic measures, new laws and enforcement mechanisms were more commonly used than anywhere else.

  1. Improve data integration performance by employing metadata management utility

    Energy Technology Data Exchange (ETDEWEB)

    Wei, M.; Sung, A.H. [New Mexico Petroleum Recovery Research Center, Socorro, NM (United States)

    2005-07-01

    This conference paper explored ways of integrating petroleum and exploration data obtained from different sources in order to provide more comprehensive data for various analysis purposes and to improve the integrity and consistency of integrated data. This paper proposes a methodology to enhance oil and gas industry data integration performance by cooperating data management utilities in Microsoft SQL Server database management system (DBMS) for small scale data integration without support of commercial software. By semi-automatically capturing metadata, data sources are investigated in detail, data quality problems are partially cleansed, and the performance of data integration is improved. 20 refs., 7 tabs., 1 fig.

  2. Mission possible? The performance of prosocially motivated employees depends on manager trustworthiness.

    Science.gov (United States)

    Grant, Adam M; Sumanth, John J

    2009-07-01

    The authors propose that in mission-driven organizations, prosocially motivated employees are more likely to perform effectively when trust cues enhance their perceptions of task significance. The authors develop and test a model linking prosocial motivation, trust cues, task significance, and performance across 3 studies of fundraisers using 3 different objective performance measures. In Study 1, perceiving managers as trustworthy strengthened the relationship between employees' prosocial motivation and performance, measured in terms of calls made. This moderated relationship was mediated by employees' perceptions of task significance. Study 2 replicated the interaction of manager trustworthiness and prosocial motivation in predicting a new measure of performance: dollars raised. It also revealed 3-way interactions between prosocial motivation, manager trustworthiness, and dispositional trust propensity, such that high trust propensity compensated for low manager trustworthiness to strengthen the association between employees' prosocial motivation and performance. Study 3 replicated all of the previous mediation and moderation findings in predicting initiative taken by professional fundraisers. Implications for work motivation, work design, and trust in organizations are discussed.

  3. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  4. Smart Sensors' Role in Integrated System Health Management

    Science.gov (United States)

    Perotti, Jose M.; Mata, Carlos

    2005-01-01

    During the last decade, there has been a major effort in the aerospace industry to reduce the cost per pond of payload and become competitive in the international market. Competition from Europe, Japan, and China has reduced this cost to almost a third from 1990 to 2000. This cost has leveled in recent years to an average price of around $12,000/pound of payload. One of NASA's goals is to promote the development of technologies to reduce this cost by a factor of 10 or more Exploration of space, specially manned exploration missions, involves very complex launch and flight vehicles, associated ground support systems, and extensive human support during all phases of the mission. When considering the Space Shuttle Program, we can see that vehicle and ground support systems' processing, operation, and maintenance represent a large percentage of the program cost and time. Reducing operating, processing and maintenance costs will greatly reduce the cost of Exploration programs. The Integrated System Health Management (ISHM) concept is one of the technologies that will help reduce these operating, processing and maintenance costs. ISHM is an integrated health monitoring system applicable to both flight and ground systems. It automatically and autonomously acquires information from sensors and actuators and processes that information using the ISHM-embedded knowledge. As a result, it establishes the health of the system based on the acquired information and its prior knowledge. When this concept is fully implemented, ISHM systems shall be able to perform failure prediction and remediation before actual hard failures occurs, preventing its costly consequences. Data sources, sensors, and their associated data acquisition systems, constitute the foundation of the system. A smart sensing architecture is required to support the acquisition of reliable, high quality data, required by the ISHM. A thorough definition of the smart sensor architectures, their embedded diagnostic

  5. Development of integrated analytical data management system

    International Nuclear Information System (INIS)

    Onishi, Koichi; Wachi, Isamu; Hiroki, Toshio

    1986-01-01

    The Analysis Subsection of Technical Service Section, Tokai Reprocessing Plant, Tokai Works, is engaged in analysis activities required for the management of processes and measurements in the plant. Currently, it has been desired to increase the reliability of analytical data and to perform analyses more rapidly to cope with the increasing number of analysis works. To meet this end, on-line data processing has been promoted and advanced analytical equipment has been introduced in order to enhance automization. In the present study, an integrated analytical data mangement system is developed which serves for improvement of reliability of analytical data as well as for rapid retrieval and automatic compilation of these data. Fabrication of a basic model of the system has been nearly completed and test operation has already been started. In selecting hardware to be used, examinations were made on easiness of system extension, Japanese language processing function for improving man-machine interface, large-capacity auxiliary memory system, and data base processing function. The existing analysis works wer reviewed in establishing the basic design of the system. According to this basic design, the system can perform such works as analysis of application slips received from clients as well as recording, sending, filing and retrieval of analysis results. (Nogami, K.)

  6. Integrated vector management: The Zambian experience

    Directory of Open Access Journals (Sweden)

    Katebe Cecilia

    2008-08-01

    Full Text Available Abstract Background The Zambian Malaria Control Programme with the Roll Back Malaria (RBM partners have developed the current National Malaria Strategic Plan (NMSP 2006–2011 which focuses on prevention based on the Integrated Vector Management (IVM strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. Achievements IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Conclusion Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  7. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  8. Five Years of NASA Science and Engineering in the Classroom: The Integrated Product Team/NASA Space Missions Course

    Science.gov (United States)

    Hakkila, Jon; Runyon, Cassndra; Benfield, M. P. J.; Turner, Matthew W.; Farrington, Phillip A.

    2015-08-01

    We report on five years of an exciting and successful educational collaboration in which science undergraduates at the College of Charleston work with engineering seniors at the University of Alabama in Huntsville to design a planetary science mission in response to a mock announcement of opportunity. Alabama high schools are also heavily involved in the project, and other colleges and universities have also participated. During the two-semester course students learn about scientific goals, past missions, methods of observation, instrumentation, and component integration, proposal writing, and presentation. More importantly, students learn about real-world communication and teamwork, and go through a series of baseline reviews before presenting their results at a formal final review for a panel of NASA scientists and engineers. The project is competitive, with multiple mission designs competing with one another for the best review score. Past classes have involved missions to Venus, Europa, Titan, Mars, asteroids, comets, and even the Moon. Classroom successes and failures have both been on epic scales.

  9. Integrating Risk Management and Strategic Planning

    Science.gov (United States)

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  10. Integrated Data Management Processes Expedite Common Data Management Tasks in Autism Research

    OpenAIRE

    Farach, Frank; Sinanis, Naralys; Hawthorne, Julie; Agnew, Henry; Schantz, Tricia; Jensen, Bill; Rozenblit, Leon

    2013-01-01

    We compare the efficiency of (1) just-in-time data management, in which data are cleaned prior to each analysis, and (2) integrated data management, in which data are centralized, cleaned up front, and made available via a query interface. Integrated data management was associated with faster completion of data management requests.

  11. Integrated, regional approach to risk management of industrial systems

    International Nuclear Information System (INIS)

    Chakraborty, S.

    1992-01-01

    This paper focuses on the following four main issues: (1) necessity for an integrated, regional approach to risk management of industrial systems; (2) principles of risk management; (3) integrated approach and overall methodology; and (4) implementation of risk management strategies on a regional basis. The U.N. Interagency project on risk management for large industrial areas, which is a pioneer type of international initiative for an integrated approach to risk management, is discussed in this context. Another encouraging activity for further development of overall methodologies for risk management is the ongoing project on the risk and safety of technical systems at the Swiss Federal Institute of Technology in Aurich. The concept of integral risk management takes into account multidimensional factors including technical, economic, political, social, and ethical considerations to allow a well-balanced decision-making process

  12. Processing and Managing the Kepler Mission's Treasure Trove of Stellar and Exoplanet Data

    Science.gov (United States)

    Jenkins, Jon M.

    2016-01-01

    The Kepler telescope launched into orbit in March 2009, initiating NASAs first mission to discover Earth-size planets orbiting Sun-like stars. Kepler simultaneously collected data for 160,000 target stars at a time over its four-year mission, identifying over 4700 planet candidates, 2300 confirmed or validated planets, and over 2100 eclipsing binaries. While Kepler was designed to discover exoplanets, the long term, ultra- high photometric precision measurements it achieved made it a premier observational facility for stellar astrophysics, especially in the field of asteroseismology, and for variable stars, such as RR Lyraes. The Kepler Science Operations Center (SOC) was developed at NASA Ames Research Center to process the data acquired by Kepler from pixel-level calibrations all the way to identifying transiting planet signatures and subjecting them to a suite of diagnostic tests to establish or break confidence in their planetary nature. Detecting small, rocky planets transiting Sun-like stars presents a variety of daunting challenges, from achieving an unprecedented photometric precision of 20 parts per million (ppm) on 6.5-hour timescales, supporting the science operations, management, processing, and repeated reprocessing of the accumulating data stream. This paper describes how the design of the SOC meets these varied challenges, discusses the architecture of the SOC and how the SOC pipeline is operated and is run on the NAS Pleiades supercomputer, and summarizes the most important pipeline features addressing the multiple computational, image and signal processing challenges posed by Kepler.

  13. Simulation and Control Lab Development for Power and Energy Management for NASA Manned Deep Space Missions

    Science.gov (United States)

    McNelis, Anne M.; Beach, Raymond F.; Soeder, James F.; McNelis, Nancy B.; May, Ryan; Dever, Timothy P.; Trase, Larry

    2014-01-01

    The development of distributed hierarchical and agent-based control systems will allow for reliable autonomous energy management and power distribution for on-orbit missions. Power is one of the most critical systems on board a space vehicle, requiring quick response time when a fault or emergency is identified. As NASAs missions with human presence extend beyond low earth orbit autonomous control of vehicle power systems will be necessary and will need to reliably function for long periods of time. In the design of autonomous electrical power control systems there is a need to dynamically simulate and verify the EPS controller functionality prior to use on-orbit. This paper presents the work at NASA Glenn Research Center in Cleveland, Ohio where the development of a controls laboratory is being completed that will be utilized to demonstrate advanced prototype EPS controllers for space, aeronautical and terrestrial applications. The control laboratory hardware, software and application of an autonomous controller for demonstration with the ISS electrical power system is the subject of this paper.

  14. Alpha: A real-time decentralized operating system for mission-oriented system integration and operation

    Science.gov (United States)

    Jensen, E. Douglas

    1988-01-01

    Alpha is a new kind of operating system that is unique in two highly significant ways. First, it is decentralized transparently providing reliable resource management across physically dispersed nodes, so that distributed applications programming can be done largely as though it were centralized. And second, it provides comprehensive, high technology support for real-time system integration and operation, an application area which consists predominately of aperiodic activities having critical time constraints such as deadlines. Alpha is extremely adaptable so that it can be easily optimized for a wide range of problem-specific functionality, performance, and cost. Alpha is the first systems effort of the Archons Project, and the prototype was created at Carnegie-Mellon University directly on modified Sun multiprocessor workstation hardware. It has been demonstrated with a real-time C(sup 2) application. Continuing research is leading to a series of enhanced follow-ons to Alpha; these are portable but initially hosted on Concurrent's MASSCOMP line of multiprocessor products.

  15. Integrating Medical Supply as Part of the Army's Single Integrated Materiel Manager Concept--Why or why Not?

    National Research Council Canada - National Science Library

    Baxter, Shelia

    1998-01-01

    .... To achieve the goal of seamless logistics integration capabilities, one concept is to establish a Single Integrated Materiel Manager for the Army which envisions integrating all such functions...

  16. Integrated management system: expedience and organizational aspects

    Directory of Open Access Journals (Sweden)

    Trunova Ekaterina Viktorovna

    2011-06-01

    Full Text Available The correctly lined up management system is an important element of intellectual capital of company and promotes growth of its market value. In the article grounded, that realization of strategy is impossible without intercommunication of strategic management and business-process management. Such organizational aspects of administrative activity, as role conception of management, strategic office and process office, are observed.

  17. The key to successful management of STS operations: An integrated production planning system

    Science.gov (United States)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  18. A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

    Science.gov (United States)

    Trevino, Luis; Johnson, Stephen B.; Patterson, Jonathan; Teare, David

    2015-01-01

    The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM

  19. Law for the Integral Management of Waste No. 8839

    International Nuclear Information System (INIS)

    2010-01-01

    The Law for Integral Waste Management No. 8839 was enacted in Costa Rica in 2010. The purpose of this law has been to regulate the integral management of residues and the efficient use of the resources, through the planning and execution of regulatory actions, operational, financial, administrative, educational, environmental and healthy of monitoring and evaluation [es

  20. Integrated Rural-Urban Water Management for Climate Based ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    There are serious short- and long-term consequences on human health, physical assets, economic ... To work, adaptive climate-proof integrated urban water management must extend throughout the whole catchment, an approach known as integrated water resource management. ... Careers · Contact Us · Site map.

  1. The nexus between integrated natural resources management and integrated water resources management in southern Africa

    Science.gov (United States)

    Twomlow, Stephen; Love, David; Walker, Sue

    The low productivity of smallholder farming systems and enterprises in the drier areas of the developing world can be attributed mainly to the limited resources of farming households and the application of inappropriate skills and practices that can lead to the degradation of the natural resource base. This lack of development, particularly in southern Africa, is of growing concern from both an agricultural and environmental perspective. To address this lack of progress, two development paradigms that improve land and water productivity have evolved, somewhat independently, from different scientific constituencies. One championed by the International Agricultural Research constituency is Integrated Natural Resource Management (INRM), whilst the second championed predominantly by Environmental and Civil Engineering constituencies is Integrated Water Resources Management (IWRM). As a result of similar objectives of working towards the millennium development goals of improved food security and environmental sustainability, there exists a nexus between the constituencies of the two paradigms, particularly in terms of appreciating the lessons learned. In this paper lessons are drawn from past INRM research that may have particular relevance to IWRM scientists as they re-direct their focus from blue water issues to green water issues, and vice-versa. Case studies are drawn from the management of water quality for irrigation, green water productivity and a convergence of INRM and IWRM in the management of gold panning in southern Zimbabwe. One point that is abundantly clear from both constituencies is that ‘one-size-fits-all’ or silver bullet solutions that are generally applicable for the enhancement of blue water management/formal irrigation simply do not exist for the smallholder rainfed systems.

  2. Integrating Mission-Based Values into Accounting Curriculum: Catholic Social Teaching and Introductory Accounting

    Science.gov (United States)

    Hise, Joan Vane; Koeplin, John P.

    2010-01-01

    This paper presents several reasons why mission-based values, in this case Catholic Social Teaching (CST), should be incorporated into a university business curriculum. The CST tenets include the sanctity of human life; call to family, community, and participation; rights and responsibilities; option for the poor and vulnerable; the dignity of…

  3. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  4. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  5. Basic principles, contents, and benefits of an integrated management system

    International Nuclear Information System (INIS)

    Schwarzin, Juergen

    2010-01-01

    The basic principles and contents of an integrated management system are presented. The report focuses on the benefits and the experience accumulated in using an integrated management system. Integrated management systems are characterized by 2 features in particular: - On the one hand, by a system holistically controlling and describing all processes within a company which are necessary to achieve the company policy and company goals as defined. - On the other hand, it combines in one integrated management system various different aspects (such as quality, environmental protection, and safety) and the resulting requirements. Successful implementation of an integrated management system requires a clear commitment by company management to the integrated management system serving as a management tool. Implementation must be assigned the appropriate importance in the company. It must not be viewed as an instrument preserving 'status quo.' Instead, it must be seen as a tool for long-term improvement of the company. Application of the integrated management system minimizes the probability of occurrence of events, but is not able to reduce it to zero. (orig.)

  6. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Charlebois, P.; Hart, R.S.; Hopkins, J.R.

    1998-01-01

    Commercial versions of CANDU reactors were put into service starting more than 25 years ago. The first unit of Ontario Hydro's Pickering A station was put into service in 1971, and Bruce A in 1977. Most CANDU reactors, however, are only now approaching their mid-life of 15 to 20 years of operation. In particular, the first series of CANDU 6 plants which entered service in the early 1980's were designed for a 30 year life and are now approaching mid life. The current CANDU 6 design is based on a 40 year life as a result of advancement in design and materials through research and development. In order to assure safe and economic operation of these reactors, a comprehensive CANDU Plant Life Management (PLIM) program is being developed from the knowledge gained during the operation of Ontario Hydro's Pickering, Bruce, and Darlington stations, worldwide information from CANDU 6 stations, CANDU research and development programs, and other national and international sources. This integration began its first phase in 1994, with the identification of most of the critical systems structures and components in these stations, and a preliminary assessment of degradation and mechanisms that could affect their fitness for service for their planned life. Most of these preliminary assessments are now complete, together with the production of the first iteration of Life Management Plans for several of the systems and components. The Generic CANDU 6 PLIM program is now reaching its maturity, with formal processes to systematically identify and evaluate the major CSSCs in the station, and a plan to ensure that the plant surveillance, operation, and maintenance programs monitor and control component degradation well within the original design specifications essential for the plant life attainment. A Technology Watch program is being established to ensure that degradation mechanisms which could impact on plant life are promptly investigated and mitigating programs established. The

  7. IM (Integrity Management) software must show flexibility to local codes

    Energy Technology Data Exchange (ETDEWEB)

    Brors, Markus [ROSEN Technology and Research Center GmbH (Germany); Diggory, Ian [Macaw Engineering Ltd., Northumberland (United Kingdom)

    2009-07-01

    There are many internationally recognized codes and standards, such as API 1160 and ASME B31.8S, which help pipeline operators to manage and maintain the integrity of their pipeline networks. However, operators in many countries still use local codes that often reflect the history of pipeline developments in their region and are based on direct experience and research on their pipelines. As pipeline companies come under increasing regulatory and financial pressures to maintain the integrity of their networks, it is important that operators using regional codes are able to benchmark their integrity management schemes against these international standards. Any comprehensive Pipeline Integrity Management System (PIMS) software package should therefore not only incorporate industry standards for pipeline integrity assessment but also be capable of implementing regional codes for comparison purposes. This paper describes the challenges and benefits of incorporating one such set of regional pipeline standards into ROSEN Asset Integrity Management Software (ROAIMS). (author)

  8. SIRSALE: integrated video database management tools

    Science.gov (United States)

    Brunie, Lionel; Favory, Loic; Gelas, J. P.; Lefevre, Laurent; Mostefaoui, Ahmed; Nait-Abdesselam, F.

    2002-07-01

    Video databases became an active field of research during the last decade. The main objective in such systems is to provide users with capabilities to friendly search, access and playback distributed stored video data in the same way as they do for traditional distributed databases. Hence, such systems need to deal with hard issues : (a) video documents generate huge volumes of data and are time sensitive (streams must be delivered at a specific bitrate), (b) contents of video data are very hard to be automatically extracted and need to be humanly annotated. To cope with these issues, many approaches have been proposed in the literature including data models, query languages, video indexing etc. In this paper, we present SIRSALE : a set of video databases management tools that allow users to manipulate video documents and streams stored in large distributed repositories. All the proposed tools are based on generic models that can be customized for specific applications using ad-hoc adaptation modules. More precisely, SIRSALE allows users to : (a) browse video documents by structures (sequences, scenes, shots) and (b) query the video database content by using a graphical tool, adapted to the nature of the target video documents. This paper also presents an annotating interface which allows archivists to describe the content of video documents. All these tools are coupled to a video player integrating remote VCR functionalities and are based on active network technology. So, we present how dedicated active services allow an optimized video transport for video streams (with Tamanoir active nodes). We then describe experiments of using SIRSALE on an archive of news video and soccer matches. The system has been demonstrated to professionals with a positive feedback. Finally, we discuss open issues and present some perspectives.

  9. SUPPORT OF QUALITY MANAGEMENT SYSTEM AND BALANCED SCORECARD IN THE INTEGRATION OF NORMATIVE, STRATEGIC AND OPERATIONAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2012-12-01

    Full Text Available Taking into consideration the problems of strategy implementation, as well as problems of external adaptation and internal integration in the enterprise, through the prism of the application of advanced management concepts, primarily - the quality management system (QMS and the balanced scorecard (BSC, leads to the opportunity to increase the integration of organizational levels of decision making and management. Understanding the support of the QMS and BSC in relationship coordination - business strategy, organizational structure and culture, is reflected in the integration and process management dimensions: 1 the existence of a hierarchical order of the strategic actions (from vision and mission, to strategy and objectives, to key success factors and key performance indicators, 2 action of various coordination mechanisms, formalization and standardization of the organizational structure and process and 3 consistent understanding and values of members of the organization, which provides efficient control of behavior, coordination and implementation of policy and company goals. Implementation of concepts of QMS and BSC will provide greater compatibility and coherence of the normative, strategic and operational management, which will lead to more successful business, enterprise development and the satisfaction of all stakeholders.

  10. Space station operations task force. Panel 4 report: Management integration

    Science.gov (United States)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  11. Improving Integrated Operation in the Joint Integrated Mission Model (JIMM) and the Simulated Warfare Environment Data Transfer (SWEDAT) Protocol

    National Research Council Canada - National Science Library

    Mutschler, David W

    2005-01-01

    ...). It allows integrated operation of resources whereby the JIMM threat environment, stimulators virtual cockpits, systems under test, and other agents are combined within the same simulation exercise...

  12. DMT - An integrated disaster management tool

    OpenAIRE

    Angermann, Michael; Khider, Mohammed; Frassl, Martin; Lichtenstern, Michael

    2009-01-01

    Supporting the humanitarian community in crisis situations worldwide is becoming increasingly important as the frequency end extent of crises are growing. The effectiveness of humanitarian aid and rescue missions is dependent on timely and reliable information. After a disaster has happened time is critical. Intervention within the first 48 hours is crucial to save lives. At the same time it is often difficult to understand how best to send in rescue teams, since in most sudden onset natural ...

  13. Dynamic management of integrated residential energy systems

    Science.gov (United States)

    Muratori, Matteo

    dissertation presents a bottom-up highly resolved model of a generic residential energy eco-system in the United States. The model is able to capture the entire energy footprint of an individual household, to include all appliances, space conditioning systems, in-home charging of plug-in electric vehicles, and any other energy needs, viewing residential and transportation energy needs as an integrated continuum. The residential energy eco-system model is based on a novel bottom-up approach that quantifies consumer energy use behavior. The incorporation of stochastic consumer behaviors allows capturing the electricity consumption of each residential specific end-use, providing an accurate estimation of the actual amount of available controllable resources, and for a better understanding of the potential of residential demand response programs. A dynamic energy management framework is then proposed to manage electricity consumption inside each residential energy eco-system. Objective of the dynamic energy management framework is to optimize the scheduling of all the controllable appliances and in-home charging of plug-in electric vehicles to minimize cost. Such an automated energy management framework is used to simulate residential demand response programs, and evaluate their impact on the electric power infrastructure. For instance, time-varying electricity pricing might lead to synchronization of the individual residential demands, creating pronounced rebound peaks in the aggregate demand that are higher and steeper than the original demand peaks that the time-varying electricity pricing structure intended to eliminate. The modeling tools developed in this study can serve as a virtual laboratory for investigating fundamental economic and policy-related questions regarding the interplay of individual consumers with energy use. The models developed allow for evaluating the impact of different energy policies, technology adoption, and electricity price structures on the total

  14. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  15. Using remote sensing to inform integrated coastal zone management

    CSIR Research Space (South Africa)

    Roberts, W

    2010-06-01

    Full Text Available TO INFORM INTERGRATED COASTAL ZONE MANAGEMENT GISSA Western Cape Regional Meeting Wesley Roberts & Melanie Luck-Vogel 2 June 2010 CSIR NRE Ecosystems Earth Observation Group What is Integrated Coastal Zone Management? Integrated coastal management... D1D1 B a n d 1 Band 2 Quick theory of CVA Magnitude Direction ( ) ( )22 xaxbyaybM ?+?= Quadrant 1 (++) Accretion Quadrant 2 (-+) Quadrant 4 (+-) Quadrant 3 (--) Erosion CVA Results & Conclusions ? Change in image time series...

  16. Ergonomics Integration Omproving Production Process Management in Enterprises of Latvia

    OpenAIRE

    Henrijs Kaļķis

    2013-01-01

    Dotoral thesis ERGONOMICS INTEGRATION IMPROVING PRODUCTION PROCESS MANAGEMENT IN ENTERPRISES OF LATVIA ANNOTATION Ergonomics integration in process management has great significance in organisations` growth of productivity. It is a new approach to entrepreneurship and business strategy, where ergonomic aspects and values are taken into account in ensuring the effective process management and profitability of enterprises. This study is aimed at solution of the problem of e...

  17. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  18. Developing Tribal Integrated Waste Management Plans

    Science.gov (United States)

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  19. Integrated Facilities Management and Fixed Asset Accounting.

    Science.gov (United States)

    Golz, W. C., Jr.

    1984-01-01

    A record of a school district's assets--land, buildings, machinery, and equipment--can be a useful management tool that meets accounting requirements and provides appropriate information for budgeting, forecasting, and facilities management. (MLF)

  20. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  1. Nigeria’s Integrated Nuclear Infrastructure Review (INIR) Mission For Phase 2 - Lessons Learned

    International Nuclear Information System (INIS)

    Erepamo Osaisai, F.

    2015-01-01

    Lessons Learned from Mission and Preparation: - Planning and successful implementation of a new NP programme is an enormous task; must take into consideration strict adherence to an established regime of nuclear safety and security; - Requires development of multilateral and bilateral partnerships and commitment to transparency, as well as the need to subject national programme implementation to external scrutiny: • The INIR process allows for independent assessment of national programmes against established standards and international best practices; • The period of development of the Self-Evaluation Report creates an opportunity for genuine soul searching and enthrones some degree of realism; • Preparation for and hosting of the INIR Mission strengthen the national stakeholder base and creates a convivial atmosphere for effective cooperation and partnership between national institutions (seventeen in Nigeria); and • Makes an embarking country a better informed and more knowledgeable customer.

  2. Research on Integration of NPP Operational Safety Management Performance Systems

    International Nuclear Information System (INIS)

    Chi, Miao; Shi, Liping

    2014-01-01

    The operational safety management of Nuclear Power Plants demands systematic planning and integrated control. NPPs are following the well-developed safety indicator systems proposed by IAEA Operational Safety Performance Indicator Programme, NRC Reactor Oversight Process or the other institutions. Integration of the systems is proposed to benefiting from the advantages of both systems and avoiding improper application into the real world. The authors analyzed the possibility and necessity for system integration, and propose an indicator system integrating method

  3. ESG Integration and the Investment Management Process : Fundamental Investing Reinvented

    NARCIS (Netherlands)

    van Duuren, Emiel; Plantinga, Auke; Scholtens, Bert

    2016-01-01

    We investigate how conventional asset managers account for environmental, social and governance factors (ESG) in their investment process. We do so on the basis of an international survey among fund managers. We find that many conventional managers integrate responsible investing in their investment

  4. Evolution of river management: up to integrated and beyond?

    NARCIS (Netherlands)

    Straatsma, M.W.; Nooij, R.J.W. de

    2010-01-01

    Integrated river management is heralded as the new style of river management, but it has been preceded by a number of previous styles, and is unlikely to be the last. This article presents the first analysis of the evolution of river management using Spiral Dynamics (SD). SD provides a growth

  5. INTEGRATED SAFETY MANAGEMENT SYSTEM IN AIR TRAFFIC SERVICES

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-06-01

    Full Text Available The article deals with the analysis of the researches conducted in the field of safety management systems.Safety management system framework, methods and tools for safety analysis in Air Traffic Control have been reviewed.Principles of development of Integrated safety management system in Air Traffic Services have been proposed.

  6. Total Ore Processing Integration and Management

    Energy Technology Data Exchange (ETDEWEB)

    Leslie Gertsch

    2006-05-15

    This report outlines the technical progress achieved for project DE-FC26-03NT41785 (Total Ore Processing Integration and Management) during the period 01 January through 31 March of 2006. (1) Work in Progress: Minntac Mine--Graphical analysis of drill monitor data moved from two-dimensional horizontal patterns to vertical variations in measured and calculated parameters. The rock quality index and the two dimensionless ({pi}) indices developed by Kewen Yin of the University of Minnesota are used by Minntac Mine to design their blasts, but the drill monitor data from any given pattern is obviously not available for the design of that shot. Therefore, the blast results--which are difficult to quantify in a short time--must be back-analyzed for comparison with the drill monitor data to be useful for subsequent blast designs. {pi}{sub 1} indicates the performance of the drill, while {pi}{sub 2} is a measure of the rock resistance to drilling. As would be expected, since a drill tends to perform better in rock that offers little resistance, {pi}{sub 1} and {pi}{sub 2} are strongly inversely correlated; the relationship is a power function rather than simply linear. Low values of each Pi index tend to be quantized, indicating that these two parameters may be most useful above certain minimum magnitudes. (2) Work in Progress: Hibtac Mine--Statistical examination of a data set from Hibtac Mine (Table 1) shows that incorporating information on the size distribution of material feeding from the crusher to the autogenous mills improves the predictive capability of the model somewhat (43% vs. 44% correlation coefficient), but a more important component is production data from preceding days (26% vs. 44% correlation coefficient), determined using exponentially weighted moving average predictive variables. This lag effect likely reflects the long and varied residence times of the different size fragments in the grinding mills. The rock sizes are also correlated with the geologic

  7. Supply chain integration, risk management and manufacturing flexibility

    DEFF Research Database (Denmark)

    Chaudhuri, Atanu; Boer, Harry; Taran, Yariv

    2018-01-01

    , respectively, and manufacturing flexibility. Design/methodology/approach – Using hierarchical regression, data are analyzed from a sample of 343 manufacturing plants in Asia collected in 2013-2014 as part of the International Manufacturing Strategy Survey (IMSS VI). Findings – Internal integration and supply......Purpose – The purpose of this paper is to investigate the impact of internal integration, external integration and supply chain risk management on manufacturing flexibility, and the moderating effect of supply chain risk management on the relationships between internal and external integration...... chain risk management have a direct effect on manufacturing flexibility. Supply chain risk management moderates the relationship between external integration and flexibility. Research limitations/implications – Further research is needed to generalize beyond the flexibility performance of discrete...

  8. Integrated Risk and Knowledge Management Program -- IRKM-P

    Science.gov (United States)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  9. QUANTITATIVE СHARACTERISTICS OF COMPLEMENTARY INTEGRATED HEALTH CARE SYSTEM AND INTEGRATED MEDICATION MANAGEMENT INFORMATION SYSTEM

    Directory of Open Access Journals (Sweden)

    L. Yu. Babintseva

    2015-05-01

    i mportant elements of state regulation of the pharmaceutical sector health. For the first time creation of two information systems: integrated medication management infor mation system and integrated health care system in an integrated medical infor mation area, operating based on th e principle of complementarity was justified. Global and technological coefficients of these systems’ functioning were introduced.

  10. Integrated Space Asset Management Database and Modeling

    Science.gov (United States)

    Gagliano, L.; MacLeod, T.; Mason, S.; Percy, T.; Prescott, J.

    The Space Asset Management Database (SAM-D) was implemented in order to effectively track known objects in space by ingesting information from a variety of databases and performing calculations to determine the expected position of the object at a specified time. While SAM-D performs this task very well, it is limited by technology and is not available outside of the local user base. Modeling and simulation can be powerful tools to exploit the information contained in SAM-D. However, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. A more capable data management infrastructure would extend SAM-D to support the larger data sets to be generated by the COI. A service-oriented architecture model will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for visualizations. Based on a web-centric approach, the entire COI will be able to access the data and related analytics. In addition, tight control of information sharing policy will increase confidence in the system, which would encourage industry partners to provide commercial data. SIMON is a Government off the Shelf information sharing platform in use throughout DoD and DHS information sharing and situation awareness communities. SIMON providing fine grained control to data owners allowing them to determine exactly how and when their data is shared. SIMON supports a micro-service approach to system development, meaning M&S and analytic services can be easily built or adapted. It is uniquely positioned to fill this need as an information-sharing platform with a proven track record of successful situational awareness system deployments. Combined with the integration of new and legacy M&S tools, a SIMON-based architecture will provide a robust SA environment for the NASA SA COI that can be extended and expanded indefinitely. First Results of Coherent Uplink from a

  11. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    Directory of Open Access Journals (Sweden)

    Marisa P. de Brito

    2010-03-01

    Full Text Available Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management issues. In this paper, we make use of behavioral theory to explain the current lack of integration. We conclude through abductive reasoning that the reasons for procrastinating integration of sustainability in supply chain and operations management research are the conflicting nature of the task and the inherent context, which is the focus on operations rather than environmental or social issues.

  12. Integrative learning for practicing adaptive resource management

    Directory of Open Access Journals (Sweden)

    Craig A. McLoughlin

    2015-03-01

    Full Text Available Adaptive resource management is a learning-by-doing approach to natural resource management. Its effective practice involves the activation, completion, and regeneration of the "adaptive management cycle" while working toward achieving a flexible set of collaboratively identified objectives. This iterative process requires application of single-, double-, and triple-loop learning, to strategically modify inputs, outputs, assumptions, and hypotheses linked to improving policies, management strategies, and actions, along with transforming governance. Obtaining an appropriate balance between these three modes of learning has been difficult to achieve in practice and building capacity in this area can be achieved through an emphasis on reflexive learning, by employing adaptive feedback systems. A heuristic reflexive learning framework for adaptive resource management is presented in this manuscript. It is built on the conceptual pillars of the following: stakeholder driven adaptive feedback systems; strategic adaptive management (SAM; and hierarchy theory. The SAM Reflexive Learning Framework (SRLF emphasizes the types, roles, and transfer of information within a reflexive learning context. Its adaptive feedback systems enhance the facilitation of single-, double-, and triple-loop learning. Focus on the reflexive learning process is further fostered by streamlining objectives within and across all governance levels; incorporating multiple interlinked adaptive management cycles; having learning as an ongoing, nested process; recognizing when and where to employ the three-modes of learning; distinguishing initiating conditions for this learning; and contemplating practitioner mandates for this learning across governance levels. The SRLF is a key enabler for implementing the "adaptive management cycle," and thereby translating the theory of adaptive resource management into practice. It promotes the heuristics of adaptive management within a cohesive

  13. Managing Quadrennial Defense Review Integration: An Overview

    National Research Council Canada - National Science Library

    Schrader, John

    2001-01-01

    ...). The lessons learned from the 1997 Quadrennial Defense Review (QDR 1997) included the need for leadership guidance and integration of analytic activities to sort through the myriad issues that are always confronting the Department of Defense...

  14. Spacelab Mission Implementation Cost Assessment (SMICA)

    Science.gov (United States)

    Guynes, B. V.

    1984-01-01

    A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.

  15. Armenia : Towards Integrated Water Resources Management

    OpenAIRE

    World Bank

    2001-01-01

    The objective of this paper is to examine the challenges in the water sector faced by Armenia today, and outline options for management and allocation of its water resources in the future, considering the need for a stable, transparent apublic sector management framework and sustainable resource use for long-term private investment and job creation, and for appropriate balances among water...

  16. An integrated approach to plant life management

    International Nuclear Information System (INIS)

    Fredlund, L.

    1998-01-01

    Plant life is no longer determined by components, almost everything can be replaced. A plant life management program should aim at actions and replacements being performed at the right time. In order to manage this there is need for experience feedback systems, a plant specific risk study and safety upgrades. (author)

  17. Pesticides and public health: integrated methods of mosquito management.

    OpenAIRE

    Rose, R. I.

    2001-01-01

    Pesticides have a role in public health as part of sustainable integrated mosquito management. Other components of such management include surveillance, source reduction or prevention, biological control, repellents, traps, and pesticide-resistance management. We assess the future use of mosquito control pesticides in view of niche markets, incentives for new product development, Environmental Protection Agency registration, the Food Quality Protection Act, and improved pest management strate...

  18. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  19. Data Distribution System (DDS) and Solar Dynamic Observatory Ground Station (SDOGS) Integration Manager

    Science.gov (United States)

    Pham, Kim; Bialas, Thomas

    2012-01-01

    The DDS SDOGS Integration Manager (DSIM) provides translation between native control and status formats for systems within DDS and SDOGS, and the ASIST (Advanced Spacecraft Integration and System Test) control environment in the SDO MOC (Solar Dynamics Observatory Mission Operations Center). This system was created in response for a need to centralize remote monitor and control of SDO Ground Station equipments using ASIST control environment in SDO MOC, and to have configurable table definition for equipment. It provides translation of status and monitoring information from the native systems into ASIST-readable format to display on pages in the MOC. The manager is lightweight, user friendly, and efficient. It allows data trending, correlation, and storing. It allows using ASIST as common interface for remote monitor and control of heterogeneous equipments. It also provides failover capability to back up machines.

  20. LAVA Subsystem Integration and Testing for the RESOLVE Payload of the Resource Prospector Mission: Mass Spectrometers and Gas Chromatography

    Science.gov (United States)

    Coan, Mary R.; Stewart, Elaine M.

    2015-01-01

    The Regolith and Environment Science & Oxygen and Lunar Volatile Extraction (RESOLVE) payload is part of Resource Prospector (RP) along with a rover and a lander that are expected to launch in 2020. RP will identify volatile elements that may be combined and collected to be used for fuel, air, and water in order to enable deeper space exploration. The Resource Prospector mission is a key part of In-Situ Resource Utilization (ISRU). The demand for this method of utilizing resources at the site of exploration is increasing due to the cost of resupply missions and deep space exploration goals. The RESOLVE payload includes the Lunar Advanced Volatile Analysis (LAVA) subsystem. The main instrument used to identify the volatiles evolved from the lunar regolith is the Gas Chromatograph-Mass Spectrometer (GC-MS). LAVA analyzes the volatiles emitted from the Oxygen and Volatile Extraction Node (OVEN) Subsystem. The objective of OVEN is to obtain, weigh, heat and transfer evolved gases to LAVA through the connection between the two subsystems called the LOVEN line. This paper highlights the work completed during a ten week internship that involved the integration, testing, data analysis, and procedure documentation of two candidate mass spectrometers for the LAVA subsystem in order to aid in determining which model to use for flight. Additionally, the examination of data from the integrated Resource Prospector '15 (RP' 15) field test will be presented in order to characterize the amount of water detected from water doped regolith samples.

  1. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  2. Integrated Vibration and Acceleration Testing to Reduce Payload Mass, Cost and Mission Risk, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a capability to provide integrated acceleration, vibration, and shock testing using a state-of-the-art centrifuge, allowing for the test of...

  3. Integrated Systems Health Management (ISHM) Toolkit

    Science.gov (United States)

    Venkatesh, Meera; Kapadia, Ravi; Walker, Mark; Wilkins, Kim

    2013-01-01

    A framework of software components has been implemented to facilitate the development of ISHM systems according to a methodology based on Reliability Centered Maintenance (RCM). This framework is collectively referred to as the Toolkit and was developed using General Atomics' Health MAP (TM) technology. The toolkit is intended to provide assistance to software developers of mission-critical system health monitoring applications in the specification, implementation, configuration, and deployment of such applications. In addition to software tools designed to facilitate these objectives, the toolkit also provides direction to software developers in accordance with an ISHM specification and development methodology. The development tools are based on an RCM approach for the development of ISHM systems. This approach focuses on defining, detecting, and predicting the likelihood of system functional failures and their undesirable consequences.

  4. Multidimensionality evaluation of supply chain management integration

    Directory of Open Access Journals (Sweden)

    Fernanda Paes Arantes

    2018-03-01

    Full Text Available Integration is constantly reported in the literature as an essential feature of SCM. However, it is as difficult to define as to operationalize it, resulting in a lack of information on how to increase the level of integration among members. Thus, this research aims to evaluate the dimensionality of SCI, to check alignment with the features identified in the literature using multivariate statistical analysis. The methodology used was based on a questionnaire to assess the level of companies integration with suppliers of its supply chain. This instrument consisted of 21 items, with response options: yes, no or not applicable. The questions focused on evaluating the integration with suppliers, so each company consulted could answer a questionnaire for each supplier, since the intensity of relationships varies. Thus, 41 companies participated in the survey, resulting in 205 responses. Full-information item factor analysis and principal component analysis on the correlation matrix tetrachoric were used for the instrument dimensionality analysis. They are appropriate procedures for analysis of dichotomous variables. The results of this analysis enabled grouping the questionnaire items in the following underlying factors: trust, information sharing, partnership, collaboration or cooperation, and coordination. The identification of such factors such as dimensions of SCI enables greater understanding on how to raise the level of integration among the members of a supply chain.

  5. Assessment and management of ecological integrity: Chapter 12

    Science.gov (United States)

    Kwak, Thomas J.; Freeman, Mary C.

    2010-01-01

    Assessing and understanding the impacts of human activities on aquatic ecosystems has long been a focus of ecologists, water resources managers, and fisheries scientists. While traditional fisheries management focused on single-species approaches to enhance fish stocks, there is a growing emphasis on management approaches at community and ecosystem levels. Of course, as fisheries managers shift their attention from narrow (e.g., populations) to broad organizational scales (e.g., communities or ecosystems), ecological processes and management objectives become more complex. At the community level, fisheries managers may strive for a fish assemblage that is complex, persistent, and resilient to disturbance. Aquatic ecosystem level objectives may focus on management for habitat quality and ecological processes, such as nutrient dynamics, productivity, or trophic interactions, but a long-term goal of ecosystem management may be to maintain ecological integrity. However, human users and social, economic, and political demands of fisheries management often result in a reduction of ecological integrity in managed systems, and this conflict presents a principal challenge for the modern fisheries manager. The concepts of biotic integrity and ecological integrity are being applied in fisheries science, natural resource management, and environmental legislation, but explicit definitions of these terms are elusive. Biotic integrity of an ecosystem may be defined as the capability of supporting and maintaining an integrated, adaptive community of organisms having a species composition, diversity, and functional organization comparable to that of a natural habitat of the region (Karr and Dudley 1981). Following that, ecological integrity is the summation of chemical, physical, and biological integrity. Thus, the concept of ecological integrity extends beyond fish and represents a holistic approach for ecosystem management that is especially applicable to aquatic systems. The

  6. Integration and change management for successful mergers; Integration und Change Management bei Fusionen

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, H.G. [Arthur Andersen Business Consulting GmbH, Duesseldorf (Germany)

    2000-05-01

    In the wake of deregulation of the energy markets in Germany, energy companies and electric utilities are confronted with fierce competition on prices and customers. The change of paradigms in the German energy industry calls for new strategies. The article discusses strategic alliances and mergers as one way to cope with the challenges, and explains suitable and proven approaches for corporate integration and change management. (CB) [German] Seit der wettbewerblichen Oeffnung des deutschen Energiemarktes sehen sich die Unternehmen mit einem dramatischen Preis- und Marketingwettbewerb konfrontiert. Aggressive neue Akteure draengen in die lukrativen Maerkte. Aber auch etablierte Teilnehmer suchen neue strategische Positionen und beschleunigen den Paradigmenwechsel in der deutschen Energiewirtschaft. Angesichts dieser Marktentwicklung bestehen massive Anforderungen zur Veraenderung. Unternehmenszusammenschluesse und Kooperationen stellen eine geeignete strategische Reaktion zur Bewaeltigung dieser Herausforderungen dar. Dabei sollten die Risiken von Fusionen nicht unterschaetzt werden. Die meisten Vorhaben scheitern auf Grund fehlender Integrationsprozesse. Ein systematischer Integrationsansatz wird beschrieben. (orig./CB)

  7. Innovation Management in Emerging Technology Ventures – The Concept of an Integrated Idea Management

    DEFF Research Database (Denmark)

    Brem, Alexander; Voigt, K.-I.

    2007-01-01

    , development and sales. Here especially, differentiating potentials are offered for emerging technology ventures. But it is important that idea and innovation management are integrated during the building-up stage while internal and external network structures are still manageable and often consist...... of the managers' and founders' personal contacts. Hence, the earlier an integrated idea management is implemented, the greater is the probability of high numbers of successful innovations.......For decades, suggestion systems have been used to include employees in the innovation process. However, in order to gather superior ideas, integrating external stakeholders is critical to the innovation success. Within this paper, the authors derive a sophisticated model of an integrated idea...

  8. Research on monitoring and management information integration technique in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Yu Ren; Mao Wei

    2013-01-01

    The integration of the waste treatment process and the device status monitoring information and management information is a key problem required to be solved in the information integration of the waste treatment and management. The main content of the monitoring and management information integration is discussed in the paper. The data exchange techniques, which are based on the OPC, FTP and data push technology, are applied to the different monitoring system respectively, according to their development platform, to realize the integration of the waste treatment process and device status monitoring information and management information in a waste treatment center. (authors)

  9. promoting integrated water resources management in south west

    African Journals Online (AJOL)

    eobe

    1, 2 SOUTH WEST REGIONAL CENTRE FOR NATIONAL WATER RESOURCES CAPACITY BUILDING NETWORK,. FEDERAL UNIVERSITY OF ... that an integrated approach to water resource development and management offers the best ...

  10. Evaluation of pre-service training on integrated management of ...

    African Journals Online (AJOL)

    Evaluation of pre-service training on integrated management of neonatal and childhood ... and reviews of pediatric course outlines and other teaching/learning materials. ... Of the 34 programs 22 were diploma nursing, 6 Bachelor of Sciences ...

  11. Integrated Measurement of Crew Resource Management and Technical Flying Skills

    Science.gov (United States)

    1993-08-01

    This report presents the findings of a study designed with two objectives: to produce a prototype performance : measurement instrument (PMI) that integrates the assessment of Crew Resource Management (CRM) and technical flying : skills and to investi...

  12. Integrated management of root-knot nematode (Meloidogyne ...

    African Journals Online (AJOL)

    Integrated management of root-knot nematode (Meloidogyne incognita) for tomato production and productivity. Bayuh Belay1* ... important food and cash crop of the farmers and is ...... some part of the research budget without any reservation.

  13. Adoption of Integrated Pest Management among Cocoa Farmers in ...

    African Journals Online (AJOL)

    E M IGBOKWE

    Keywords: Integrated pest management, Cocoa farmers, Farmers Field School ... Total World production has increased in absolute terms from 3.98 million metric ..... and G.C. Rausser, eds Handbook of Agricultural Economics, Vol. 1B,.

  14. Integrating distributed Bayesian inference and reinforcement learning for sensor management

    NARCIS (Netherlands)

    Grappiolo, C.; Whiteson, S.; Pavlin, G.; Bakker, B.

    2009-01-01

    This paper introduces a sensor management approach that integrates distributed Bayesian inference (DBI) and reinforcement learning (RL). DBI is implemented using distributed perception networks (DPNs), a multiagent approach to performing efficient inference, while RL is used to automatically

  15. Some aspects of integrated coastal zone management in India

    Digital Repository Service at National Institute of Oceanography (India)

    Untawale, A.G.

    . This trend has created tremendous pressures and the ecological balance is disturbing. There are various factors which are degrading the coastal waters. The Integrated Coastal Management is relatively a recent concept, which involves multidisciplinary approach...

  16. Sensor Area Network for Integrated Systems Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition of every element in a complex System...

  17. Integration of structural health monitoring and asset management.

    Science.gov (United States)

    2012-08-01

    This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...

  18. Chip Integrated, Hybrid EHD/Capillary Driven Thermal Management System

    Data.gov (United States)

    National Aeronautics and Space Administration — Chip-Integrated, Hybrid EHD/Capillary-Driven Thermal Management System is a two year that will leverage independently attained yet related prototype hardware...

  19. Sensor Area Network for Integrated Systems Health Management, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a...

  20. Privacy Impact Assessment for the Integrated Grants Management System

    Science.gov (United States)

    The Integrated Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data is collected, how it will be used, access to the data, the purpose of data collection, and record retention policies.

  1. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  2. Integrated corridor management : implementation guide and lessons learned.

    Science.gov (United States)

    2012-02-01

    This implementation guide is intended for use by adopters of integrated corridor management (ICM) approaches and strategies to address congestion and travel time reliability issues within specific travel corridors. It introduces the topic of ICM and ...

  3. Development and improvement of the integrated system of management

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa Galeevna

    2014-07-01

    Full Text Available Integrated management system construction can be considered a way that transforms using business processes and information resources into final construction products. Autonomous system of quality management, environmental, health and safety organizations introduction usually lead to the accumulation of duplicate documents, which increase the time spent on processing and analysis as well as increase the financial costs of maintaining the operation of each of them separately. System integration allows reducing these costs and entailing the most obvious benefits: reduced volumes of documents; reduction of time spent on analysis; reducing the cost of audit and certification; involvement of all the employees of the organization; productivity growth; increasing the attractiveness for consumers; reducing the burden on administrative and executive devices; ensuring a high level of flexibility in the organization's management system in case of internal and external changes. Integration of quality management systems, environmental management and safety management systems, production and safety led to the possibility to establish such integrated management system in developing building companies, which allows establishing a unified management system, as an element of management of organization. The main drawback of the currently used standards and specifications is the lack of flexibility of their application, as well as the basic principles and approaches to their implementation. Thus, knowing about what the system should be, but not knowing how to create it, many organizations have to operate without methodological support. Absence of mandatory standards concerning integration of management systems creates opportunities for the existence of multiple options for interaction systems. Economic effects on the integrated management system is formed from three sources: the reduction of production costs by improving product quality and reducing defects and

  4. Integrated Structural Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) proposes to advance the state of the art in composite health management through refinement of an existing technology developed...

  5. Integrated sign management system : ADOT maintenance group

    Science.gov (United States)

    2003-12-01

    The Arizona Department of Transportation (ADOT) maintains and manages an inventory of roadway signs. Before the implementation of this project, sign technicians maintained inventory records on individual laptops to track their daily sign maintenance ...

  6. The integration of environmental management standards in ...

    African Journals Online (AJOL)

    Research in Hospitality Management is co-published by NISC (Pty) Ltd and Routledge, .... over a total of 12 categories that can all fit the concept of ... Purchasing strategies and reducing consumption ..... In this case there are three options: 1.

  7. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  8. Integrated Vegetation Management Practices Memorandum of Understanding

    Science.gov (United States)

    Memorandum of Understanding between EPA and the Edison Electric Institute, U.S. Department of Agriculture (Forest Service), and U.S. Department of the Interior (Bureau of Land Management, Fish and Wildlife Service, and National Park Service for IVM.

  9. Smallholder integrated crop management (ICM) research planning ...

    African Journals Online (AJOL)

    Mo

    More women farmers were invited because they do most of the farming. Other participants came from ... smallholders to innovate their land and crop management strategies. This would be ..... Asian Farming Systems Association, 2 (2): 67.

  10. An integration architecture for knowledge management system and business process management system

    NARCIS (Netherlands)

    Jung, J.; Choi, I.; Song, M.S.

    2007-01-01

    Recently, interests in the notion of process-oriented knowledge management (PKM) from academia and industry have been significantly increased. Comprehensive research and development requirements along with a cogent framework, however, have not been proposed for integrating knowledge management (KM)

  11. Management systems for high reliability organizations. Integration and effectiveness; Managementsysteme fuer Hochzuverlaessigkeitsorganisationen. Integration und Wirksamkeit

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Michael

    2015-03-09

    The scope of the thesis is the development of a method for improvement of efficient integrated management systems for high reliability organizations (HRO). A comprehensive analysis of severe accident prevention is performed. Severe accident management, mitigation measures and business continuity management are not included. High reliability organizations are complex and potentially dynamic organization forms that can be inherently dangerous like nuclear power plants, offshore platforms, chemical facilities, large ships or large aircrafts. A recursive generic management system model (RGM) was development based on the following factors: systemic and cybernetic Asepcts; integration of different management fields, high decision quality, integration of efficient methods of safety and risk analysis, integration of human reliability aspects, effectiveness evaluation and improvement.

  12. Structural Integrity Management for Fixed Offshore Platforms in Malaysia

    OpenAIRE

    Narayanan Sambu Potty; Mohammad Kabir B. Mohd Akram

    2009-01-01

    Structural Integrity Management (SIM) is important for the protection of offshore crew, environment, business assets and company and industry reputation. API RP 2A contained guidelines for assessment of existing platforms mostly for the Gulf of Mexico (GOM). ISO 19902 SIM framework also does not specifically cater for Malaysia. There are about 200 platforms in Malaysia with 90 exceeding their design life. The Petronas Carigali Sdn Bhd (PCSB) uses the Asset Integrity Management ...

  13. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  14. Integrated management systems: survey results from Portuguese companies and experts

    OpenAIRE

    Domingues, Pedro; Sampaio, Paulo; Arezes, P.

    2012-01-01

    The proliferation of several certifiable sub-systems among different type of organizations lead companies to excessive departmentalization. This fact turned out to be, due to several reasons pointed out by numerous authors, disadvantageous. Hence, organizations optioned by integration of their management sub-systems. Academic awareness to this sociological event is mainly related with the fact of integration of management systems (IMS) had been performed empirically, that is, by each organiza...

  15. The tortoise shell Integrated Coastal Management in Galapagos

    OpenAIRE

    Polit Arguello, Victor Manuel

    2013-01-01

    The current work aims to examine the legal framework for Integrated Coastal Management for Archipelago de Galapagos. It examines the content of ICM at the internal level in order to find if there is a standard for appropriate Integrated Management of Coastal Zones. Also it aims to define whether the ratification of UNCLOS by the government of Ecuador should affect the implementation of such framework.

  16. Understanding Organizational Memory from the Integrated Management Systems (ERP)

    OpenAIRE

    Gilberto Perez; Isabel Ramos

    2013-01-01

    With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP), we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP) we tried to draw a parallel between ...

  17. DESIGN OF INFORMATION MANAGEMENT SYSTEM OF VERTICALLY INTEGRATED AGRICULTURAL HOLDINGS

    Directory of Open Access Journals (Sweden)

    Александр Витальевич ШМАТКО

    2015-05-01

    Full Text Available The paper deals with an approach to the design and development of information systems for the management and optimization of the organizational structure of vertically integrated agricultural holdings. A review of the problems of building and improving the organizational structure of vertically integrated agricultural holding is made. A method of constructing a discrete model management structure agricultural holding, which minimizes the costs associated with attracting applicants to work, is proposed.

  18. A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

    Science.gov (United States)

    Trevino, Luis; Patterson, Jonathan; Teare, David; Johnson, Stephen

    2015-01-01

    The engineering development of the new Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these spacecraft systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex system engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in specialized Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model based algorithms and their development lifecycle from inception through Flight Software certification are an important focus of this development effort to further insure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. NASA formed a dedicated M&FM team for addressing fault management early in the development lifecycle for the SLS initiative. As part of the development of the M&FM capabilities, this team has developed a dedicated testbed that

  19. Integrated Information Technology Framework for Analysis of Data from Enrichment Plants to Support the Safeguards Mission

    International Nuclear Information System (INIS)

    Marr, Clifton T.; Thurman, David A.; Jorgensen, Bruce V.

    2008-01-01

    Many examples of software architectures exist that support process monitoring and analysis applications which could be applied to enrichment plants in a fashion that supports the Safeguards Mission. Pacific Northwest National Laboratory (PNNL) has developed mature solutions that will provide the framework to support online statistical analysis of enrichment plans and the entire nuclear fuel cycle. Most recently, PNNL has developed a refined architecture and supporting tools that address many of the common problems analysis and modeling environments experience: pipelining, handling large data volumes, and real-time performance. We propose the architecture and tools may be successfully used in furthering the goals of nuclear material control and accountability as both an aid to processing plant owners and as comprehensive monitoring for oversight teams.

  20. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    Science.gov (United States)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  1. OCRWM [Office of Civilian Radioactive Waste Management] mission plan amendment with comments on the draft amendment and responses to the comments

    International Nuclear Information System (INIS)

    1987-06-01

    The US Department of Energy (DOE) published in June 1985 the Mission Plan for the Civilian Radioactive Waste Management Program. That document was to provide an informational basis sufficient to permit informed decisions to be made in carrying out the program. DOE recognized that the Mission Plan would be revised. The first such revision is this amendment, which has been prepared to apprise the Congress of significant recent achievements in the waste-management program, the revised schedule for the first repository, and the intent to postpone site-specific work for the second repository and plans for continuing the technology-development program for the second repository. Included are the DOE's submittal to the Congress of a proposal for the construction of a facility for monitored retrievable storage (MRS) as an integral part of the waste-management system and aspects of the consultation-and-cooperation interactions between the DOE and affected states and Indian tribes. The amendment presents the DOE's considered and informed judgments, based on its actual experience in administering these programs, of the preferred courses and schedules for the national program. 104 refs., 7 tabs

  2. Maintaining control while delegating trust: Integrity constraints in trust management

    NARCIS (Netherlands)

    Etalle, S.; Winsborough, W.H.

    2009-01-01

    We introduce the use, monitoring, and enforcement of integrity constraints in trust management-style authorization systems. We consider what portions of the policy state must be monitored to detect violations of integrity constraints. Then, we address the fact that not all participants in a

  3. Integrated Pest Management of the Southern Pine Beetle

    Science.gov (United States)

    Robert N. Coulson; Hannu Saarenmaa

    2011-01-01

    Integrated pest management (IPM) is the maintenance of destructive agents, including insects, at tolerable levels by the planned use of a variety of preventive, suppressive, or regulatory tactics and strategies that are ecologically and economically efficient and socially and politically acceptable. It is explicit that the actions taken are fully integrated into the...

  4. Implementing Integrated Multicultural Instructional Design in Management Education

    Science.gov (United States)

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  5. Integrating Social Science and Ecosystem Management: A National Challenge

    Science.gov (United States)

    Cordell; H. Ken; Linda Caldwell

    1995-01-01

    These proceedings contain the contributed papers and panel presentations, as well as a paper presented at the National Workshop, of the Conference on Integrating Social Sciences and Ecosystem Management, which was held at Unicoi Lodge and Conference Center, Helen, GA, December 12-14, 1995. The overall purpose of this Conference was to improve understanding, integration...

  6. Integrating an Information Literacy Quiz into the Learning Management System

    Science.gov (United States)

    Lowe, M. Sara; Booth, Char; Tagge, Natalie; Stone, Sean

    2014-01-01

    The Claremont Colleges Library Instruction Services Department developed a quiz that could be integrated into the consortial learning management software to accompany a local online, open-source information literacy tutorial. The quiz is integrated into individual course pages, allowing students to receive a grade for completion and improving…

  7. Management Ethics: Integrity at Work. Sage Series on Business Ethics.

    Science.gov (United States)

    Petrick, Joseph A.; Quinn, John F.

    This book tries to redefine what it means for a manager to function with integrity and competence in the private and public sectors domestically and globally. It integrates theoretical work in both descriptive and normative ethics and incorporates legal, communication, quality, and organizational theories into a conceptual framework designed to…

  8. Thermal Management in Fine-Grained 3-D Integrated Circuits

    OpenAIRE

    Iqbal, Md Arif; Macha, Naveen Kumar; Danesh, Wafi; Hossain, Sehtab; Rahman, Mostafizur

    2018-01-01

    For beyond 2-D CMOS logic, various 3-D integration approaches specially transistor based 3-D integrations such as monolithic 3-D [1], Skybridge [2], SN3D [3] holds most promise. However, such 3D architectures within small form factor increase hotspots and demand careful consideration of thermal management at all levels of integration [4] as stacked transistors are detached from the substrate (i.e., heat sink). Traditional system level approaches such as liquid cooling [5], heat spreader [6], ...

  9. Integrated model for line balancing with workstation inventory management

    OpenAIRE

    Dilip Roy; Debdip khan

    2010-01-01

    In this paper, we address the optimization of an integrated line balancing process with workstation inventory management. While doing so, we have studied the interconnection between line balancing and its conversion process. Almost each and every moderate to large manufacturing industry depends on a long and integrated supply chain, consisting of inbound logistic, conversion process and outbound logistic. In this sense an approach addresses a very general problem of integrated line balancing....

  10. Integrated Management of Residential Energy Resources

    Directory of Open Access Journals (Sweden)

    Antunes C. H.

    2012-10-01

    Full Text Available The increasing deployment of distributed generation systems based on renewables in the residential sector, the development of information and communication technologies and the expected evolution of traditional power systems towards smart grids are inducing changes in the passive role of end-users, namely with stimuli to change residential demand patterns. The residential user should be able to make decisions and efficiently manage his energy resources by taking advantages from his flexibility in load usage with the aim to minimize the electricity bill without depreciating the quality of energy services provided. The aim of this paper is characterizing electricity consumption in the residential sector and categorizing the different loads according to their typical usage, working cycles, technical constraints and possible degree of control. This categorization of end-use loads contributes to ascertain the availability of controllable loads to be managed as well as the different direct management actions that can be implemented. The ability to implement different management actions over diverse end-use load will increase the responsiveness of demand and potentially raises the willingness of end-users to accept such activities. The impacts on the aggregated national demand of large-scale dissemination of management systems that would help the end-user to make decisions regarding electricity consumption are predicted using a simulator that generates the aggregated residential sector electricity consumption under variable prices.

  11. A new generation of real-time DOS technology for mission-oriented system integration and operation

    Science.gov (United States)

    Jensen, E. Douglas

    1988-01-01

    Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.

  12. Integrating technologies for effective knowledge management

    Energy Technology Data Exchange (ETDEWEB)

    Beaugrand, F.S.; Curtis, T.A. [Public Petroleum Data Model, PPDM Association, Calgary, AB (Canada)

    2002-06-01

    In order to succeed in today's business environment, effective knowledge management strategies are needed along with effective tools to solve real business problems. Relational databases provide accessible and practical tools that can be used to manage corporate knowledge assets. However, technology is growing so rapidly that it is difficult and too expensive for individual corporations to pursue each line of development independently. Collaborative efforts are needed to improve access to shared knowledge. The PPDM Association is an international not for profit standards body that is working collaboratively with the petroleum exploration and production industry to develop standards for managing data and knowledge, spatially enabling data, standardizing data content and data exchange. The PPDM Association provides a vendor-neutral environment for development, technical support and a methodology for designing, developing and publishing technical deliverables.

  13. Nuclear safety culture and integrated risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.; Orvis, D.D.

    1993-01-01

    A primary focus of nuclear safety is the prevention of large releases of radioactivity in the case of low-probability severe accidents. An analysis of the anatomy of nuclear (Chernobyl, Three Mile Island Unit 2) and nonnuclear (Challenger, Bhopal, Piper Alpha, etc.) severe accidents yields four broad categories of root causes: human (operating crew response), machine (design with its basic flaws), media (natural phenomena, operational considerations, political environment, commercial pressures, etc.)-providing triggering events, and management (basic organizational safety culture flaws). A strong management can minimize the contributions of humans, machines, and media to the risk arising from the operation of hazardous facilities. One way that management can have a powerful positive influence is through the establishment of a proper safety culture. The term safety culture is used as defined by the International Atomic Energy Agency's International Safety Advisory Group

  14. Managed care, vertical integration strategies and hospital performance.

    Science.gov (United States)

    Wang, B B; Wan, T T; Clement, J; Begun, J

    2001-09-01

    The purpose of this study is to examine the association of managed care with hospital vertical integration strategies, as well as to observe the relationships of different types of vertical integration with hospital efficiency and financial performance. The sample consists of 363 California short-term acute care hospitals in 1994. Linear structure equation modeling is used to test six hypotheses derived from the strategic adaptation model. Several organizational and market factors are controlled statistically. Results suggest that managed care is a driving force for hospital vertical integration. In terms of performance, hospitals that are integrated with physician groups and provide outpatient services (backward integration) have better operating margins, returns on assets, and net cash flows (p < 0.01). These hospitals are not, however, likely to show greater productivity. Forward integration with a long-term-care facility, on the other hand, is positively and significantly related to hospital productivity (p < 0.001). Forward integration is negatively related to financial performance (p < 0.05), however, opposite to the direction hypothesized. Health executives should be responsive to the growth of managed care in their local market and should probably consider providing more backward integrated services rather than forward integrated services in order to improve the hospital's financial performance in today's competitive health care market.

  15. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  16. Barriers to Asthma Management for School Nurses: An Integrative Review

    Science.gov (United States)

    Hanley Nadeau, Ellen; Toronto, Coleen E.

    2016-01-01

    Childhood asthma is a growing health concern. Asthma is the most common chronic illness of childhood and a leading cause of emergency room visits, hospitalizations, and school absenteeism. School nurses play a valuable role in asthma management. The purpose of this integrative review is to examine barriers to asthma management for school nurses in…

  17. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  18. From Knowledge Theory to Management Practice: Towards an Integrated Approach.

    Science.gov (United States)

    Shin, Minsoo; Holden, Tony; Schmidt, Ruth A.

    2001-01-01

    Critically contrasts the three main schools of thought on knowledge and assesses the resulting implications for knowledge management. Presents a conceptual model to integrate theoretical and practical themes to serve as a framework for developing a future research agenda for the development of knowledge management business tools and applications.…

  19. Challenges of Integrated Pest Management in Sub-Saharan Africa

    NARCIS (Netherlands)

    Huis, van A.

    2009-01-01

    a response to the negative side effects of chemical control in the developed world, Integrated Pest Management (IPM) developed with an emphasis on reducing the role of pesticides. Later the role of natural enemies was recognized as being the cornerstone for sustainable pest management strategies.

  20. Integrating the traditional and the modern conflict management ...

    African Journals Online (AJOL)

    The study examines the modalities for integrating traditional and modern conflict management strategies in Nigeria using an analysis of relevant documents as well as Black's Social Control Theory and Thomas-Kilmann's Model of Conflict Management. The successful amalgamation of diverse groups has radically shifted ...

  1. Integration of Women into Management Positions: A Research Review.

    Science.gov (United States)

    Terborg, James R.

    This paper reviews the literature on the psychological and social processes involved in the integration of women into management positions. The author concentrates on two areas. First is the entry of women into management (including women's career choices, choice of organization, and the effects of these choices on the organization. These effects…

  2. Multidisciplinary management--an opportunity for service integration.

    Science.gov (United States)

    Cameron, M

    1997-01-01

    The management team of the future will enter an environment requiring facilitation, participation, clinical, and empowerment skills. Those individuals who possess a clinical orientation as well as business expertise will be sought to manage multidisciplinary units. The rapid changes in the health-care environment have forced organizations to restructure their operations. To achieve quality care, customer satisfaction, cost-effectiveness, and efficiency, service integration across the organization will be required. As we approach the 21st century, this standard will evolve until "all levels are managing patient care." Some of the restructuring trends occurring in the health-care industry have been collaboration service integration, management consolidation, and job elimination. The emphasis for the multidisciplinary manager of the future will include integrating the professional and clinical services, managing information, building community partnerships, promoting physician collaboration, and managing the change process. A model organization in the next century will move toward a people-oriented system with inclusion and empowerment initiatives. Service integration will affect all organizations, but the disciplines within the Clinical Support System will be the most affected. Future opportunities of leadership will exist for pathologists, nurses, or medical technologists as the professional silos of managers and clinicians continue to crumble.

  3. Supply Chain Management and Sustainability : Procrastinating Integration in Mainstream Research

    NARCIS (Netherlands)

    De Brito, M.P.; Van der Laan, E.A.

    2010-01-01

    Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management

  4. Development and Implementation of Integrated Pest Management in ...

    African Journals Online (AJOL)

    Nafiisah

    This paper reviews the status of Integrated Pest Management (IPM) research in. Mauritius and also reports on the successful cases of IPM implementation during ... Tool. Activity. Status. Source. Biological control. Introduce parasitoids .... 10 g sugar in 1 L of water) in plastic bottles as one option to manage fruit flies in.

  5. The integration of quality management functions within a university ...

    African Journals Online (AJOL)

    According to a recent study, institutions of higher learning in South Africa fail to a great extent to integrate the key management functions that are fundamental to effective quality management. This article argues that the effective promotion of quality of a university's core business depends to a large extent on the ability of an ...

  6. A review of Integrated Management of Childhood Illness (IMCI ...

    African Journals Online (AJOL)

    The Integrated Management of Childhood Illness (IMCI) strategy is the primary child-care approach of choice for South Africa.1,2 IMCI training was introduced into ... by nurse practitioner and doctor alike in empowering them to make easy, evidence-based decisions in the management of sick children at first contact level.

  7. The Integrative University: Why University Management Is Different

    Science.gov (United States)

    Temple, Paul

    2008-01-01

    Managing universities "is" different from managing in most other sorts of organisation. In this article, the author shows why this claim is more than just special pleading, and how it relates to the particular form of the organisation. Appreciating their integrative aspects helps people to understand some of the difficulties that they regularly…

  8. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 13 MAY 2015 2...Threat to our National Economy DOD Cybersecurity Gaps Could Be Canary in Federal Acquisition Coal Mine Intangible Assets Create Vulnerabilities...operational approach integrates with current or planned CONOPS, BCP, information architecture, programs or initiatives Development  Approach to

  9. Development of integrated accident management assessment technology

    International Nuclear Information System (INIS)

    Jung, Won Dea; Ha, Jae Joo; Jin, Young Ho

    2002-04-01

    This project aims to develop critical technologies for accident management through securing evaluation frameworks and supporting tools, in order to enhance capabilities coping with severe accidents. For the research goal, firstly under the viewpoint of accident prevention, on-line risk monitoring system and the analysis framework for human error have been developed. Secondly, the training/supporting systems including the training simulator and the off-site risk evaluation system have been developed to enhance capabilities coping with severe accidents. Four kinds of research results have been obtained from this project. Firstly, the framework and taxonomy for human error analysis has been developed for accident management. As the second, the supporting system for accident managements has been developed. Using data that are obtained through the evaluation of off-site risk for Younggwang site, the risk database as well as the methodology for optimizing emergency responses has been constructed. As the third, a training support system, SAMAT, has been developed, which can be used as a training simulator for severe accident management. Finally, on-line risk monitoring system, DynaRM, has been developed for Ulchin 3 and 4 unit

  10. Integrated management of thesis using clustering method

    Science.gov (United States)

    Astuti, Indah Fitri; Cahyadi, Dedy

    2017-02-01

    Thesis is one of major requirements for student in pursuing their bachelor degree. In fact, finishing the thesis involves a long process including consultation, writing manuscript, conducting the chosen method, seminar scheduling, searching for references, and appraisal process by the board of mentors and examiners. Unfortunately, most of students find it hard to match all the lecturers' free time to sit together in a seminar room in order to examine the thesis. Therefore, seminar scheduling process should be on the top of priority to be solved. Manual mechanism for this task no longer fulfills the need. People in campus including students, staffs, and lecturers demand a system in which all the stakeholders can interact each other and manage the thesis process without conflicting their timetable. A branch of computer science named Management Information System (MIS) could be a breakthrough in dealing with thesis management. This research conduct a method called clustering to distinguish certain categories using mathematics formulas. A system then be developed along with the method to create a well-managed tool in providing some main facilities such as seminar scheduling, consultation and review process, thesis approval, assessment process, and also a reliable database of thesis. The database plays an important role in present and future purposes.

  11. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  12. Management of Uncertain Data - towards unattended integration

    NARCIS (Netherlands)

    de Keijzer, Ander

    2008-01-01

    In recent years, the need to support uncertain data has increased. Sensor applications, for example, are dealing with the inherent uncertainty about the readings of the sensors. Current database management systems are not equipped to deal with this uncertainty, other than as a user defined

  13. Steam generator asset management: integrating technology and asset management

    International Nuclear Information System (INIS)

    Shoemaker, P.; Cislo, D.

    2006-01-01

    Asset Management is an established but often misunderstood discipline that is gaining momentum within the nuclear generation industry. The global impetus behind the movement toward asset management is sustainability. The discipline of asset management is based upon three fundamental aspects; key performance indicators (KPI), activity-based cost accounting, and cost benefits/risk analysis. The technology associated with these three aspects is fairly well-developed, in all but the most critical area; cost benefits/risk analysis. There are software programs that calculate, trend, and display key-performance indicators to ensure high-level visibility. Activity-based costing is a little more difficult; requiring a consensus on the definition of what comprises an activity and then adjusting cost accounting systems to track. In the United States, the Nuclear Energy Institute's Standard Nuclear Process Model (SNPM) serves as the basis for activity-based costing. As a result, the software industry has quickly adapted to develop tracking systems that include the SNPM structure. Both the KPI's and the activity-based cost accounting feed the cost benefits/risk analysis to allow for continuous improvement and task optimization; the goal of asset management. In the case where the benefits and risks are clearly understood and defined, there has been much progress in applying technology for continuous improvement. Within the nuclear generation industry, more specialized and unique software systems have been developed for active components, such as pumps and motors. Active components lend themselves well to the application of asset management techniques because failure rates can be established, which serves as the basis to quantify risk in the cost-benefits/risk analysis. A key issue with respect to asset management technologies is only now being understood and addressed, that is how to manage passive components. Passive components, such as nuclear steam generators, reactor vessels

  14. Multiple sclerosis care: an integrated disease-management model.

    Science.gov (United States)

    Burks, J

    1998-04-01

    A disease-management model must be integrated, comprehensive, individual patient focused and outcome driven. In addition to high quality care, the successful model must reduce variations in care and costs. MS specialists need to be intimately involved in the long-term care of MS patients, while not neglecting primary care issues. A nurse care manager is the "glue" between the managed care company, health care providers and the patient/family. Disease management focuses on education and prevention, and can be cost effective as well as patient specific. To implement a successful program, managed care companies and health care providers must work together.

  15. "INTEGRATED QUALITY MANAGEMENT" AS A SUBJECT IN HIGHER EDUCATION CURRICULUM

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2007-03-01

    Full Text Available The importance of introduction of "Integrated quality management" into higher education curricula arises from the need for students to grasp synergetic application of new and advanced approaches to theoretical and practical management quality and process based management in particular as well as understanding a unified concept which improves conformity and linking of all levels in management hierarchy (normative, strategic and operational toward accomplishment of successful business performance. A curriculum is proposed (as a contribution to a map of necessary knowledge to be expected from prospective quality personnel with appropriate topics in accordance with studies objective and chosen up-to-date options of management concepts and methods.

  16. Managing the physics of the economics of integrated health care.

    Science.gov (United States)

    Zismer, Daniel K; Werner, Mark J

    2012-01-01

    The physics metaphor, as applied to the economics (and financial performance) of the integrated health system, seems appropriate when considered together with the nine principles of management framework provided. The nature of the integrated design enhances leaders' management potential as they consider organizational operations and strategy in the markets ahead. One question begged by this argument for the integrated design is the durability, efficiency and ultimate long-term survivability of the more "traditional" community health care delivery models, which, by design, are fragmented, internally competitive and less capital efficient. They also cannot exploit the leverage of teams, optimal access management or the pursuit of revenues made available in many forms. For those who wish to move from the traditional to the more integrated community health system designs (especially those who have not yet started the journey), the path requires: * Sufficient balance sheet capacity to fund the integration process-especially as the model requires physician practice acquisitions and electronic health record implementations * A well-prepared board13, 14 * A functional, durable and sustainable physician services enterprise design * A redesigned organizational and governance structure * Favorable internal financial incentives alignment design * Effective accountable physician leadership * Awareness that the system is not solely a funding strategy for acquired physicians, rather a fully -.. committed clinical and business model, one in which patient-centered integrated care is the core service (and not acute care hospital-based services) A willingness to create and exploit the implied and inherent potential of an integrated design and unified brand Last, it's important to remember that an integrated health system is a tool that creates a "new potential" (a physics metaphor reference, one last time). The design doesn't operate itself. Application of the management principles

  17. Clarifying the Imperative of Integration Research for Sustainable Environmental Management

    Directory of Open Access Journals (Sweden)

    Stephen Dovers

    2005-01-01

    Full Text Available This paper discusses why integration is important in doing research for developing policy and practice of sustainable environmental management. The imperative of integration includes environmental, social, economic, and other disciplinary considerations, as well as stakeholder interests. However, what is meant by integration is not always clear. While the imperative is being increasingly enunciated, the challenges it presents are difficult and indicate a long term pursuit. This paper clarifies the different dimensions of integration, as an important preliminary step toward advancing mutual understanding and the development of approaches. The paper identifies the driving forces for integration, discusses when integration is required, categorises forms of integration, and proposes principles to inform research programs and projects.

  18. Integrating total quality management in a library setting

    CERN Document Server

    Jurow, Susan

    2013-01-01

    Improve the delivery of library services by implementing total quality management (TQM), a system of continuous improvement employing participative management and centered on the needs of customers. Although TQM was originally designed for and successfully applied in business and manufacturing settings, this groundbreaking volume introduces strategies for translating TQM principles from the profit-based manufacturing sector to the library setting. Integrating Total Quality Management in a Library Setting shows librarians how to improve library services by implementing strategies such as employ

  19. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  20. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  1. Integrated flexible capacity and inventory management under flexible capacity uncertainty

    OpenAIRE

    Paç, Mehmet Fazıl

    2006-01-01

    Cataloged from PDF version of article. In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study we consider the integrated management of inventory and flexible capacity management under seasonal stochastic demand and uncertain labor supply. The capacity planning problem is investigated from the workforce planning perspective. We consider a manufactu...

  2. INTEGRATION MECHANISMS OF IMPROVEMENT OF HUMAN RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vera A. Akimenko

    2013-01-01

    Full Text Available In the current economic conditions, the efficiency of business processes of an organization is determined by the quality of the staff. Therefore, actual is the creation and application of new approaches to the management of human re-sources. The article presents a comparative analysis of management practices and their impact on the effectiveness of personnel management, the mechanism of their integration to improve the efficiency of the process.

  3. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  4. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  5. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  6. Integrated information and logistics management, quality management and firm performance of pork processing industry in China

    NARCIS (Netherlands)

    Han, J.; Trienekens, J.H.; Omta, S.W.F.

    2009-01-01

    Purpose – This paper seeks to discuss the interactions amongst integrated information technology (IT), integrated logistics management, quality management practices and firm performance of pork processors in China. Design/methodology/approach – A conceptual framework was developed by examining the

  7. Highly integrated Pluto payload system (HIPPS): a sciencecraft instrument for the Pluto mission

    Science.gov (United States)

    Stern, S. Alan; Slater, David C.; Gibson, William; Reitsema, Harold J.; Delamere, W. Alan; Jennings, Donald E.; Reuter, D. C.; Clarke, John T.; Porco, Carolyn C.; Shoemaker, Eugene M.; Spencer, John R.

    1995-09-01

    We describe the design concept for the highly integrated Pluto payload system (HIPPS): a highly integrated, low-cost, light-weight, low-power instrument payload designed to fly aboard the proposed NASA Pluto flyby spacecraft destined for the Pluto/Charon system. The HIPPS payload is designed to accomplish all of the Pluto flyby prime (IA) science objectives, except radio science, set forth by NASA's Outer Planets Science Working Group (OPSWG) and the Pluto Express Science Definition Team (SDT). HIPPS contains a complement of three instrument components within one common infrastructure; these are: (1) a visible/near UV CCD imaging camera; (2) an infrared spectrograph; and (3) an ultraviolet spectrograph. A detailed description of each instrument is presented along with how they will meet the IA science requirements.

  8. An Exploration of Integrated Ground Weapons Concepts for Armor/Anti- Armor Missions

    Science.gov (United States)

    1991-01-01

    possible configurations. A DC circuit could be powered by a DC homopolar generator, or AC power could be rectified to power DC motors . An ED could also be...the bare round designs, concepts from FMC, Western Designs, and General Motors were considered. Of these concepts, the Ares design for containerized...funds were no longer available. Two industrial teams, one led by Royal Ordnance and the other by General Motors , recently completed an integration study

  9. Integrated remotely sensed datasets for disaster management

    OpenAIRE

    McCarthy, Tim; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-01-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North...

  10. Integral management of hazardous materials transport

    International Nuclear Information System (INIS)

    Moran, M.

    2002-01-01

    As a result of outsourcing transport operations and complementary services on the part of the producers and shippers, there is a growing demand for global services that integrate the whole external logistics value chain, the latter being understood to signify the process that includes the storage, transport (monomodal or bi-multi-modal) and delivery to destination. This circumstance has obliged transport firms to undertake a process of internal transformation: from offering an activity purely of transport to becoming logistics operators. Express Truck, S. a. (hereinafter ETSA) could not ignore this market requirement. We will explain the evolutionary process of ETSA in this sense. (Author)

  11. Integrated Data Management for Mobile Services in the Real World

    DEFF Research Database (Denmark)

    Hage, C.; Jensen, Christian Søndergaard; Pedersen, Torben Bach

    2003-01-01

    Market research companies predict a huge market for services to be delivered to mobile users. Services in5 clude route guidance, point-of-interest search, metering services such as road pricing and parking payment, traffic monitoring, etc. We believe that no single such service will be the killer...... service, but that suites of integrated services are called for. Such integrated services reuse integrated content obtained from multiple content providers. This paper describes concepts and techniques underlying the data management system deployed by a Danish mobile content integrator. While geo...

  12. Improving integration for integrated coastal zone management: an eight country study.

    Science.gov (United States)

    Portman, M E; Esteves, L S; Le, X Q; Khan, A Z

    2012-11-15

    Integrated coastal zone management (ICZM) is a widely accepted approach for sustainable management of the coastal environment. ICZM emphasizes integration across sectors, levels of government, uses, stakeholders, and spatial and temporal scales. While improving integration is central to progress in ICZM, the role of and the achievement of integration remain understudied. To further study these two points, our research analyzes the performance of specific mechanisms used to support ICZM in eight countries (Belgium, India, Israel, Italy, Portugal, Sweden, UK, and Vietnam). The assessment is based on a qualitative comparative analysis conducted through the use of two surveys. It focuses on five ICZM mechanisms (environmental impact assessment; planning hierarchy; setback lines; marine spatial planning, and regulatory commission) and their role in improving integration. Our findings indicate that certain mechanisms enhance specific types of integration more effectively than others. Environmental impact assessment enhances science-policy integration and can be useful to integrate knowledge across sectors. Planning hierarchy and regulatory commissions are effective mechanisms to integrate policies across government levels, with the latter also promoting public-government integration. Setback lines can be applied to enhance integration across landscape units. Marine spatial planning is a multi-faceted mechanism with the potential to promote all types of integration. Policy-makers should adopt the mechanisms that are suited to the type of integration needed. Results of this study also contribute to evidence-based coastal management by identifying the most common impediments related to the mechanisms of integration in the eight studied countries. Copyright © 2012 Elsevier B.V. All rights reserved.

  13. Gas mission; Mission gaz

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This preliminary report analyses the desirable evolutions of gas transport tariffing and examines some questions relative to the opening of competition on the French gas market. The report is made of two documents: a synthesis of the previous report with some recommendations about the tariffing of gas transport, about the modalities of network access to third parties, and about the dissociation between transport and trade book-keeping activities. The second document is the progress report about the opening of the French gas market. The first part presents the European problem of competition in the gas supply and its consequences on the opening and operation of the French gas market. The second part presents some partial syntheses about each topic of the mission letter of the Ministry of Economics, Finances and Industry: future evolution of network access tariffs, critical analysis of contractual documents for gas transport and delivery, examination of auxiliary services linked with the access to the network (modulation, balancing, conversion), consideration about the processing of network congestions and denied accesses, analysis of the metering dissociation between the integrated activities of gas operators. Some documents are attached in appendixes: the mission letter from July 9, 2001, the detailed analysis of the new temporary tariffs of GdF and CFM, the offer of methane terminals access to third parties, the compatibility of a nodal tariffing with the presence of three transport operators (GdF, CFM and GSO), the contract-type for GdF supply, and the contract-type for GdF connection. (J.S.)

  14. The practical implementation of integrated safety management for nuclear safety analysis and fire hazards analysis documentation

    International Nuclear Information System (INIS)

    COLLOPY, M.T.

    1999-01-01

    In 1995 Mr. Joseph DiNunno of the Defense Nuclear Facilities Safety Board issued an approach to describe the concept of an integrated safety management program which incorporates hazard and safety analysis to address a multitude of hazards affecting the public, worker, property, and the environment. Since then the U S . Department of Energy (DOE) has adopted a policy to systematically integrate safety into management and work practices at all levels so that missions can be completed while protecting the public, worker, and the environment. While the DOE and its contractors possessed a variety of processes for analyzing fire hazards at a facility, activity, and job; the outcome and assumptions of these processes have not always been consistent for similar types of hazards within the safety analysis and the fire hazard analysis. Although the safety analysis and the fire hazard analysis are driven by different DOE Orders and requirements, these analyses should not be entirely independent and their preparation should be integrated to ensure consistency of assumptions, consequences, design considerations, and other controls. Under the DOE policy to implement an integrated safety management system, identification of hazards must be evaluated and agreed upon to ensure that the public. the workers. and the environment are protected from adverse consequences. The DOE program and contractor management need a uniform, up-to-date reference with which to plan. budget, and manage nuclear programs. It is crucial that DOE understand the hazards and risks necessarily to authorize the work needed to be performed. If integrated safety management is not incorporated into the preparation of the safety analysis and the fire hazard analysis, inconsistencies between assumptions, consequences, design considerations, and controls may occur that affect safety. Furthermore, confusion created by inconsistencies may occur in the DOE process to grant authorization of the work. In accordance with

  15. Effects of top management involvement in integrated marketing communications

    Directory of Open Access Journals (Sweden)

    Nina Hočevar

    2007-12-01

    Full Text Available There is scarce empirical evidence in the academic literature of how top management involvement influences the degree of integrated marketing communications. At the same time, some authors believe that this relationship should be explored more extensively.In this paper we present one possible approach to investigating the relationship between top management involvement and the degree of integrated marketing communications. Our research established that a greater involvement of top management in marketing communications could be associated with a higher degree of IMC. Investigating the relationship between management and IMC is indeed at a very early stage. We suggest that this study has provided a basis for future research on the relationship between top management involvement in marketing communications and the degree of IMC.

  16. Overview Of Impacts Of Technology Deployment On The Mission Of The Department Of Energy Office Of Environmental Management

    International Nuclear Information System (INIS)

    McCabe, D.; Chamberlain, G.; Looney, B.; Gladden, J.

    2010-01-01

    The Environmental Management (EM) mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The EM program has embraced a mission completion philosophy based on reducing risk and environmental liability over a 40-50 year lifecycle. The Department has made great progress toward safely disposing of its legacy nuclear waste. EM Research and Development (R and D) program management strategies have driven numerous technology and engineering innovations to reduce risk, minimize cleanup costs, and reduce schedules. Engineering and technology investments have provided the engineering foundation, technical assistance, approaches, and technologies that have contributed to moving the cleanup effort forward. These successes include start-up and operation of several waste treatment facilities and processes at the sites.

  17. Software Environment for Mission Design, Simulation, and Engineering Data Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — As NASA designs and develops the next generation of scientific and space exploration vehicles and missions, there is a growing need for a robust, flexible, and...

  18. Integrating risk management into the baselining process

    International Nuclear Information System (INIS)

    Jennett, N.; Tonkinson, A.

    1994-01-01

    These processes work together in building the project (comprised of the technical, schedule, and cost baselines) against which performance is measured and changes to the scope, schedule and cost of a project are managed and controlled. Risk analysis is often performed as the final element of the scheduling or estimating processes, a precursor to establishing cost and schedule contingency. However, best business practices dictate that information that may be crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable. The purpose or risk management is not to eliminate risk. Neither is it intended to suggest wholesale re-estimating and re-scheduling of a project. Rather, the intent is to make provisions to reduce and control the schedule and/or cost ramifications of risk by anticipating events and conditions that cannot be reliably planned for and which have the potential to negatively impact accomplishment of the technical objectives and requirements of the project

  19. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  20. A Review of Ocean Management and Integrated Resource Management Programs from Around the World

    OpenAIRE

    , Seaplan

    2018-01-01

    This draft report is one of several prepared under contract to the Massachusetts Ocean Partnership (MOP) to support the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) in its development of the integrated coastal ocean management plan mandated by the Massachusetts Oceans Act of 2008. The purpose of this report was to inventory and review ocean management and integrated resource management programs from around the world, including the United States, Europe, Australia...