WorldWideScience

Sample records for integrated corridor management

  1. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  2. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  3. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  4. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  5. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  6. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  7. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  8. Integrated corridor management : implementation guide and lessons learned.

    Science.gov (United States)

    2012-02-01

    This implementation guide is intended for use by adopters of integrated corridor management (ICM) approaches and strategies to address congestion and travel time reliability issues within specific travel corridors. It introduces the topic of ICM and ...

  9. Integrated risk management of safety and development on transportation corridors

    International Nuclear Information System (INIS)

    Thekdi, Shital A.; Lambert, James H.

    2015-01-01

    Prioritization of investments to protect safety and performance of multi-regional transportation networks from adjacent land development is a key concern for infrastructure agencies, land developers, and other stakeholders. Despite ample literature describing relationships between transportation and land use, no evidence-based methods exist for monitoring corridor needs on a large scale. Risk analysis is essential to the preservation of system safety and capacity, including avoidance of costly retrofits, regret, and belated action. This paper introduces the Corridor Trace Analysis (CTA) for prioritizing corridor segments that are vulnerable to adjacent land development. The method integrates several components: (i) estimation of likelihood of adjacent land development, using influence diagram and rule-based modeling, (ii) characterization of access point density using geospatial methods, and (iii) plural-model evaluation of corridors, monitoring indices of land development likelihood, access point densities, and traffic volumes. The results inform deployment of options that include closing access points, restricting development, and negotiation of agencies and developers. The CTA method is demonstrated on a region encompassing 6000 centerline miles (about 10,000 km) of transportation corridors. The method will be of interest to managers investing in safety and performance of infrastructure systems, balancing safety, financial, and other criteria of concern for diverse stakeholders. - Highlights: • The Corridor Trace Analysis (CTA) method for prioritizing transportation corridors. • The CTA method studies corridors vulnerable to adjacent land development. • The CTA method quantifies the influence of risk scenarios on agency priorities. • The CTA method is demonstrated on 6000 miles of critical transportation corridor

  10. US-75 ICM system as-built design : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    This As-Built document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that indepen...

  11. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  12. Integrated corridor management : implementation guide and lessons learned (final report version 2.0).

    Science.gov (United States)

    2015-09-01

    This implementation guide is intended for use by adopters of integrated corridor management (ICM) approaches and strategies to address congestion and travel time reliability issues within specific travel corridors. It introduces the topic of ICM and ...

  13. Integrated corridor management : phase I, concept development and foundational research. Task 3.4, identify integrated corridor management institutional strategies and administration

    Science.gov (United States)

    2006-04-12

    Task 3 involves overall foundational research to further the understanding of various aspects of Integrated Corridor Management (ICM) and to identify integration issues needed to evaluate the feasibility of the ICM initiative. The focus of Task 3.4 a...

  14. Integrated corridor management (ICM) knowledge and technology transfer (KTT).

    Science.gov (United States)

    2014-01-01

    The ICM approach involves aggressive, : proactive integration of infrastructure : along major corridors so that : transportation professionals can fully : leverage all existing modal choices : and assets. ICM helps transportation : leaders improve tr...

  15. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  16. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  17. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ICM proje...

  18. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  19. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  20. Control Strategies for Corridor Management

    Science.gov (United States)

    2016-06-28

    Integrated management of travel corridors comprising of freeways and adjacent arterial streets can potentially improve the performance of the highway facilities. However, several research gaps exist in data collection and performance measurement, ana...

  1. I-880 Integrated Corridor Management Concept of Operation : Final Submittal: Concept of Operations for the I-880 Corridor in Oakland, California

    Science.gov (United States)

    2008-03-31

    This report describes the draft Concept of Operations that has been developed for the Integrated Corridor Mobility (ICM) program by the I-880 corridor team. The I-880 corridor team has defined this Concept of Operations (ConOps) based on two primary ...

  2. Effective strategies for comprehensive corridor management

    Science.gov (United States)

    2004-10-01

    Despite the increasing importance of comprehensive corridor management at the state and local government level, questions remain regarding effective methods for developing and implementing corridor management plans. Further insight is also needed int...

  3. Integrated Corridor Management (ICM) Initiative : ICM Surveillance and Detection Requirements for Arterial and Transit Networks

    Science.gov (United States)

    2008-10-01

    The primary objective of the ICM Initiative is to demonstrate how Intelligent Transportation System (ITS) technologies can efficiently and proactively facilitate the movement of people and goods through major transportation corridors that comprise a ...

  4. An integrated management tool for rockfall evaluation along transportation corridors: the ParaChute research project

    Science.gov (United States)

    Cloutier, Catherine; Locat, Jacques; Mayers, Mélanie; Noël, François; Turmel, Dominique; Jacob, Chantal; Dorval, Pierre; Bossé, François; Gionet, Pierre; Jaboyedoff, Michel

    2016-04-01

    Rockfall is a significant hazard along linear infrastructures due to the presence of natural and man-made rock slopes. Knowing where the problematic rockfalls source areas are is of primary importance to properly manage and mitigate the risk associated to rockfall along linear infrastructures. The aim of the ParaChute research project is to integrate various technologies into a workflow for rockfall characterization for such infrastructures, using a 220 km-long railroad as the study site which is located on Québec's North Shore, Canada. The objectives of this 3-year project which started in 2014 are: (1) to optimize the use of terrestrial, mobile and airborne laser scanners data into terrain analysis, structural geology analysis and rockfall susceptibility rating, (2) to further develop the use of unmanned aerial vehicles (UAV) for photogrammetry applied to rock cliff characterization, and (3) to integrate rockfall simulation studies into a rock slope classification system similar to the Rockfall Hazard Rating System. Firstly, based on laser scanner data and aerial photographs, the morpho-structural features of the terrain (genetic material, landform, drainage, etc.) are mapped. The result can be used to assess all types of mass movements. Secondly, to guide field work and decrease uncertainty of various parameters, systematic rockfall simulations and a first structural analysis are made from point clouds acquired by mobile and airborne laser scanner. The simulation results are used to recognize the rock slopes that have potentially problematic rockfall paths, meaning they could reach the linear infrastructure. Other rock slopes are not included in the inventory. Field work is carried out to validate and complete the rock slopes characterization previously made from remote sensing technique. Because some or parts of cliffs are not visible or accessible from the railroad, we are currently developing the use of photogrammetry by UAV in order to complete the

  5. Integrated corridor management initiative : demonstration phase evaluation, San Diego institutional and organizational analysis test plan.

    Science.gov (United States)

    2003-03-01

    In March of 2001, the Federal Highway Administration (FHWA), in conjunction with the Federal Transit Administration (FTA), engaged Gannett Fleming, Inc., to develop the first ever Tunnel Management System to benefit both highway and rail transit tunn...

  6. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  7. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  8. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  9. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Science.gov (United States)

    2013-12-06

    ...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...

  10. Delivery of workshops on corridor management and preservation in Texas.

    Science.gov (United States)

    2010-12-01

    This report summarizes the delivery and outcome of a series of workshops conducted at 23 Texas : Department of Transportation (TxDOT) districts across the state on corridor management and preservation : in Texas. The workshops served as follow-up imp...

  11. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Science.gov (United States)

    2013-07-19

    ... effort will result in an integrated visitor and transportation management plan for the Going-to-the Sun... sustainability of the park's shuttle system, management of visitor use, and congestion and protection of natural...] Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National Park...

  12. MOSAIC : Model of Sustainability and Integrated Corridors : [research summary].

    Science.gov (United States)

    2015-02-01

    In order to improve transportation, environmental, and livability : conditions for Maryland residents and visitors, the Maryland : State Highway Administration (SHA) initiated planning efforts to : improve critical highway corridors and promote susta...

  13. A synthesis of hydrochemistry with an integrated conceptual model for groundwater in the Hexi Corridor, northwestern China

    Science.gov (United States)

    Wang, Liheng; Dong, Yanhui; Xu, Zhifang

    2017-09-01

    Although many studies have investigated the recharge and evolution of groundwater in the Hexi Corridor, northwestern (NW) China, they describe individual sites such as Jinchang, Jiuquan, Dunhuang, and others. Considering the similarity of these sites, a systematic review of the entire Hexi Corridor is lacking. This paper compares and summarizes previous studies in the Hexi Corridor to provide a regional perspective of the isotopic characteristics and hydrochemical composition of groundwater. In unconfined aquifers, groundwater is recharged by snow and ice melt water from the Qilian Mountains; local precipitation can be neglected. Therefore, the groundwater belongs to a unique hydrological cycle model in the Hexi Corridor, referred to as snow and ice melt water-groundwater system. The dominant anion species changes from HCO3- in front of the mountains to SO42- in the middle basin and Cl- at the basin boundary along the groundwater flow direction, and TDS increases gradually owing to evaporation. A major hydrogeochemical process is the dissolution of minerals from the aquifer in the recharge area changing to cation exchange reactions in the discharge area. Confined groundwater was recharged mainly in the late Pleistocene and middle Holocene at colder temperatures than those of modern times; thus, it is non-renewable. In addition to dissolution, the hydrochemical composition of confined groundwater is also affected by cation exchange reactions. The hydrogeochemical categories of the confined groundwater are simple and stable. In the present study, a conceptual model is established on the basis of the analyses presented, which has important implications for water resource management in the Hexi Corridor. The inter-basin water allocation program should continue in order to achieve optimal utilization of water resources, but groundwater exploitation should be limited as much as possible. Additionally, on the basis of the review and integration of previous research, the

  14. Response of Wolves to Corridor Restoration and Human Use Management

    Directory of Open Access Journals (Sweden)

    Brenda Shepherd

    2006-12-01

    Full Text Available Corridor restoration is increasingly being used to connect habitat in mountainous areas where rugged topography and increasing human activity fragment habitat. Wolves (Canis lupus are a conservation priority because they avoid areas with high levels of human use and are ecologically important predators. We examined how corridor restoration through a golf course changes the distribution of wolves and their prey in Jasper National Park, Alberta, Canada. We followed and recorded wolf paths in the snow both within the corridor and in the surrounding landscape before and after a corridor was re-established. Track transects were used to estimate prey abundance and snow depths, and trail counters measured human activity. We compared resources on wolf paths to available movement routes using conditional logistic regression and also compared resources used by wolves before and after restoration. We addressed potential confounding effects of prey abundance, snow depths, and levels of human use by testing for changes in these variables. Prior to restoration, wolves traveled around the golf course and used the mountainside to connect valley-bottom habitat. Conversely, elk (Cervus elaphus densities were highest in the golf course. After restoration, wolves shifted most of their movement to the golf course corridor, whereas elk dispersed along the corridor and mountainside. When traveling through the study area, wolves selected for areas with high prey abundance, low elevations, and low levels of human activity. Corridor restoration increased the area of high quality habitat available to wolves and increased their access to elk and deer at low elevations. Our results corroborate other studies suggesting that wolves and elk quickly adapt to landscape changes and that corridor restoration can improve habitat quality and reduce habitat fragmentation.

  15. Transport Corridors in the Russian Integration Projects, the Case of the Eurasian Economic Union

    Directory of Open Access Journals (Sweden)

    Olga A. Podberezkina

    2015-01-01

    Full Text Available The article discusses the political importance of transport corridors in terms of the development of integration projects in the post-Soviet space. The world is witnessing the formation of a single market and transport and communication infrastructure, which intensifies competition among regional and world leaders, both states and non-state actors, such as businesses, markets over the routes of transporting goods. In the medium and long term the value of the control over the transport routes will increase due to the dynamics of economic development in the Asia-Pacific region. Competition for the development of projects of international transport corridors (ITC between the leading countries in the region will increase, because the ITC entail the formation of a common political space, the reduction of tariff and customs barriers, which provides easy access to the markets of countries linked by ITCs and creates the preconditions for economic integration. The growing political importance of ITC is reflected in the fact that global leaders such as China, the US, the EU, are trying to create their own versions of international land transport corridors connecting Europe and Asia. China is trying to promote their transport project "Economic Belt Silk Road" European countries develop cooperation on ITC TRACECA with other countries of Eurasia. US also embody their interests through the implementation of the project by the ITC in Afghanistan. Transport corridors in Russia are seen as a way to integrate it into the global transportation system and logistics space. To do this, Russia needs to develop Eurasian transport corridors through its territory. As a result of the implementation of transport projects Russia will be able to ensure the transit of goods from China to Europe, which has a positive impact on the economic development of the regions through which they pass. Development of international transportation through Russia will unite many of the

  16. The Western Energy Corridor Initiative: Unconventional Fuel Development Issues, Impacts, and Management Assessment

    Science.gov (United States)

    Wolfsberg, A.; Hagood, M.; Pasqualini, D.; Wood, T.; Wilson, C.; Witkowski, M.; Levitt, D.; Pawar, R.; Keating, G.; Ziock, H.

    2008-12-01

    The United States is increasingly dependent on imported oil and gas; commodities for which other nations are competing and for which future supply may be inadequate to support our transportation fuel needs. Therefore, a renewed interest in 'harder-to-get' unconventional fuels has emerged in both industry and government with directed focus on world class hydrocarbon resources within a corridor extending from Canada southward through the Rocky Mountain States. Within this Western Energy Corridor, co-located with significant conventional hydrocarbon and renewable energy resources, lie some of the world's richest unconventional hydrocarbon resources in oil shales, oil sands and coal for coal-to-liquid conversion. However, development of these resources poses substantial environmental concerns as well as increasing competition for limited resources of water and habitat. With large-scale energy development in the predominantly rural region, local communities, infrastructures, and economies will face increasing demands for roads, electricity, law enforcement, labor, and other support services. The Western Energy Corridor Initiative (WECI) seeks to develop an integrated assessment of the impacts of unconventional fuel development, the interrelationships of planned energy developments in different basins, and the resultant demands placed on the region. This initial WECI study focuses on two of the most important current issues for industry, regulators, and stakeholders -- the assessment of carbon and water resources issues, impacts, and management strategies. Through scenario analyses using coupled systems and process level models, this study investigates the viability of integrated development of multiple energy resources in a carbon neutral and environmentally acceptable manner, and the interrelationships of various energy resource development plans. The modeling framework is designed to extend to include infrastructure, employment, training, fiscal and economic demands

  17. KPI Building Blocks For Successful Green Transport Corridor Implementation

    Directory of Open Access Journals (Sweden)

    Prause Gunnar

    2015-12-01

    Full Text Available The green transport corridor concept represents a cornerstone in the development of integrated and sustainable transport solutions. Important properties of green corridors are their transnational character and their high involvement of large numbers of public and private stakeholders, including political level, requiring sophisticated approaches for implementation, management and governance. The current scientific discussion focusses on Key Performance Indicators (KPI for monitoring and management of green transport corridor performance emphasizing the operational aspects.

  18. A Survey of Soil Enzyme Activities along Major Roads in Beijing: The Implications for Traffic Corridor Green Space Management

    Directory of Open Access Journals (Sweden)

    Tianxin Li

    2015-10-01

    Full Text Available Soil quality is critical to the management of urban green space, in particular, along traffic corridors where traffic-related air pollution is significant. Soil quality can be evaluated by soil enzyme activities, which show quick responses to both natural and anthropogenic disturbances. In this study, we investigated three soil enzyme activities (i.e., dehydrogenase, catalase and urease along the major roads in urban areas of Beijing. Results show the activities of dehydrogenase, catalase and urease in urban samples were 58.8%, 68.2% and 48.5% less than the rural sample, respectively. The content of fluorescent amino acids as indicators of microbial activities was also consistently lower in urban samples than the rural. We observed two times greater exposure of particulate material along the roadsides in urban areas than rural areas. Although traffic air pollutants provide some nutrient sources to stimulate the URE activity, the exposure to traffic-related air pollution leads to the substantial decrease in enzyme activities. There were significant negative correlations for exposure to PM10 with DHA (r = −0.8267, p = 0.0017 and CAT (r = −0.89, p = 0.0002 activities. For the urban soils URE activity increased with the increasing of PM. We conclude that the degraded soil quality can negatively affect the target of developing plants and green spaces along the traffic corridors to mitigate the traffic impact. This study suggests the investigation of integrated strategies to restore the soil quality, reinforce the ecological service functions of green spaces along the traffic corridors and reduce the traffic pollutants.

  19. Fostering Sustainable Transportation Operations through Corridor Management: A Simulation Gaming Approach

    Directory of Open Access Journals (Sweden)

    Shalini Kurapati

    2018-02-01

    Full Text Available Synchromodality is described as a network of well-synchronised and interconnected transportation modes. One of the most important advantages of synchromodality is the development of a sustainable transportation system. Given the numerous stakeholders and network interdependencies within freight transport corridors, achieving efficient coordination and management is complex. In this paper, we regard information exchange as one of the main enablers of collaboration between the infrastructure managers. We developed a digital single-player simulation game called “Modal Manager” comprising logistic service providers and infrastructure managers. Each player takes over the role of an infrastructure manager who must use information provision as a tool to control flows in a network where various planned and unplanned disruptions occur. We include the game in a session where participants are able to interact with the game and with each other. The first gameplay session with Dutch experts revealed that infrastructure managers perceive synchromodality as a way to cope with disruptions more efficiently. On the other hand, the concept of synchromodal corridor management is ambiguous and various legal and governance barriers exist that hinder its implementation.

  20. Development and Implementation of the Waste Management Information System to Support Hanford's River Corridor Cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Nolan, L M [Washington Closure Hanford, LLC, 3070 George Washington Way, Richland, WA 99354 (United States)

    2006-07-01

    This paper describes the development of a Waste Information Management System (WMIS) to support the waste designation, transportation, and disposal processes used by Washington Closure Hanford, LLC to support cleanup of the Columbia River Corridor. This waste, primarily consisting of remediated burial sites and building demolition debris, is disposed at the Environmental Restoration Disposal Facility (ERDF), which is located in the center of the Hanford Site (an approximately 1460 square kilometers site). WMIS uses a combination of bar-code scanning, hand-held computers, and strategic employment of a radio frequency identification (RFID) tag system to track each waste shipment from waste generation to disposal. (authors)

  1. Optimal Corridor Selection for a Road Space Management Strategy: Methodology and Tool

    Directory of Open Access Journals (Sweden)

    Sushant Sharma

    2017-01-01

    Full Text Available Nationwide, there is a growing realization that there are valuable benefits to using the existing roadway facilities to their full potential rather than expanding capacity in a traditional way. Currently, state DOTs are looking for cost-effective transportation solutions to mitigate the growing congestion and increasing funding gaps. Innovative road space management strategies like narrowing of multiple lanes (three or more and shoulder width to add a lane enhance the utilization while eliminating the costs associated with constructing new lanes. Although this strategy (among many generally leads to better mobility, identifying optimal corridors is a challenge and may affect the benefits. Further, there is a likelihood that added capacity may provide localized benefits, at the expense of system level performance measures (travel time and crashes because of the relocation of traffic operational bottlenecks. This paper develops a novel transportation programming and investment decision method to identify optimal corridors for adding capacity in the network by leveraging lane widths. The methodology explicitly takes into consideration the system level benefits and safety. The programming compares two conflicting objectives of system travel time and safety benefits to find an optimal solution.

  2. Integrating occupancy modeling and interview data for corridor identification: A case study for jaguars in Nicaragua

    Science.gov (United States)

    Zeller, K.A.; Nijhawan, S.; Salom-Perez, R.; Potosme, S.H.; Hines, J.E.

    2011-01-01

    Corridors are critical elements in the long-term conservation of wide-ranging species like the jaguar (Panthera onca). Jaguar corridors across the range of the species were initially identified using a GIS-based least-cost corridor model. However, due to inherent errors in remotely sensed data and model uncertainties, these corridors warrant field verification before conservation efforts can begin. We developed a novel corridor assessment protocol based on interview data and site occupancy modeling. We divided our pilot study area, in southeastern Nicaragua, into 71, 6. ??. 6 km sampling units and conducted 160 structured interviews with local residents. Interviews were designed to collect data on jaguar and seven prey species so that detection/non-detection matrices could be constructed for each sampling unit. Jaguars were reportedly detected in 57% of the sampling units and had a detection probability of 28%. With the exception of white-lipped peccary, prey species were reportedly detected in 82-100% of the sampling units. Though the use of interview data may violate some assumptions of the occupancy modeling approach for determining 'proportion of area occupied', we countered these shortcomings through study design and interpreting the occupancy parameter, psi, as 'probability of habitat used'. Probability of habitat use was modeled for each target species using single state or multistate models. A combination of the estimated probabilities of habitat use for jaguar and prey was selected to identify the final jaguar corridor. This protocol provides an efficient field methodology for identifying corridors for easily-identifiable species, across large study areas comprised of unprotected, private lands. ?? 2010 Elsevier Ltd.

  3. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  4. Integrated nursery pest management

    Science.gov (United States)

    R. Kasten Dumroese

    2012-01-01

    What is integrated pest management? Take a look at the definition of each word to better understand the concept. Two of the words (integrated and management) are relatively straightforward. Integrated means to blend pieces or concepts into a unified whole, and management is the wise use of techniques to successfully accomplish a desired outcome. A pest is any biotic (...

  5. Developing guidelines for incorporating managing demand into WSDOT planning and programming: transportation demand management guidance for corridor planning studies.

    Science.gov (United States)

    2016-02-01

    The Washington State Department of Transportation (WSDOT) regional planning programs address current and forecasted deficiencies of State highways through the conduct of corridor studies. This Guidance for the conduct of corridor planning studies is ...

  6. Knowledge, Norms and Preferences for Tamarisk Management in the Green and Colorado River Corridors of the Colorado Plateau

    OpenAIRE

    Allred, E. Clay

    2012-01-01

    Extensive research exists regarding invasive alien plant species including impacts to native ecosystems and efficacy of control methods on public lands and river corridors. Many studies have identified the need for more research regarding the social implications of invasive alien species management. More specifically, additional research is needed regarding the impacts of invasive alien plant management on the Colorado Plateau to river-based recreation experiences. It is important for public ...

  7. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  8. 78 FR 65751 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-11-01

    ... importance: 1. Overall effectiveness--how well the vision of the organization and the activities proposed...) technical issues experienced with the applicant's computer or information technology environment. Background... existing or proposed organization that will lead to the development and operation of ICM--including...

  9. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-12-23

    ...) 366-8839, or via email at [email protected] . Business hours for the FHWA are from 8:00 a.m., e.t... Ahead for Progress in the 21st Century Act authorizes the FHWA to encourage Intelligent Transportation...

  10. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  11. The role of Situation Awareness in Synchromodal Corridor Management : A simulation gaming perspective

    NARCIS (Netherlands)

    Kurapati, S.; Kourounioti, I.; Lukosch, H.K.; Bekebrede, G.; Tavasszy, L.A.; Verbraeck, A.; Van Meijeren, Jaco; Lebesque, Layla

    2017-01-01

    Synchromodal transport has the potential to offer flexible, reliable, cost-effective and sustainable freight transportation by enabling real-time switching between transport modes. Given the numerous stakeholders and network interdependencies within freight transport corridors, achieving

  12. MOSAIC : Model Of Sustainability And Integrated Corridors, phase 3 : comprehensive model calibration and validation and additional model enhancement.

    Science.gov (United States)

    2015-02-01

    The Maryland State Highway Administration (SHA) has initiated major planning efforts to improve transportation : efficiency, safety, and sustainability on critical highway corridors through its Comprehensive Highway Corridor : (CHC) program. This pro...

  13. Disturbance of Traffic Noise: Evaluation on the Effects and Management on Road Corridors

    Science.gov (United States)

    Mutalib, Nur Hazliyana Abdul; Mashros, Nordiana; Aminudin, Eeydzah; Zakaria, Rozana; Haron, Zaiton; Talib, Muhammad Hilmi Abd; Hamid, Abdul Rahim Abdul

    2018-04-01

    Several adverse of stimuli can cause annoyance due to the characterized by such effects of distraction on health and delay in activities. Noise annoyance mainly due to the increasing in traffic volume has recognized as important environmental stressor which associated to anxiety and depression. In this manner, it can impose serious damage to human wellbeing, human comfort ability and reduces labour productivity. Hence, this paper aims in evaluating the effects on traffic noise and managing the precaution on road corridors in order to reduce the traffic noise. This case study had been conducted at residential area which is located at Taman Mutiara Rini, residential area located in the southern region of West Peninsular Malaysia. The traffic noise index (TNI) and noise pollution level (NPL) were recorded for a whole day in order to evaluate noise performance with different time durations. From the study, it was shown that the noise level at the Mutiara Rini is above than 75 dBA at most of time which is exceed the permissible limit from the guidelines recommended by the World Health Organization (WHO) and Department of Environment (DOE). According to the guidelines, the maximum limitation for noise pollution during daytime at residential area is about 55 dBA. From the interviewed conducted, it shows that reduction on the traffic noise can be improved by proposing and providing the noise barrier which includes the restoration of trees and concrete wall which can reduce the effects on the traffic noise.

  14. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description

  15. Managing for Organizational Integrity.

    Science.gov (United States)

    Paine, Lynn Sharp

    1994-01-01

    Compliance-based ethics programs focus on prevention, detection, and punishment. Companies should adopt an integrity-based approach to ethics management that combines a concern for the law with an emphasis on managerial responsibility for ethical behavior. (JOW)

  16. Integrated Health Management Definitions

    Data.gov (United States)

    National Aeronautics and Space Administration — The Joint Army Navy NASA Air Force Modeling and Simulation Subcommittee's Integrated Health Management panel was started about 6 years ago to help foster...

  17. Small mammal distributions relative to corridor edges within intensively managed southern pine plantations.

    Science.gov (United States)

    Nicole L. Constantine; Tyler A. Campbell; William M. Baughman; Timothy B. Harrington; Brian R. Chapman; Karl V. Miller

    2005-01-01

    We characterized small mammal communities in three loblolly pine (Pinus taeda) stands in the Lower Coastal Plain of South Carolina during June 1998-Aug. 2000 to investigate influence of corridor edges on small mammal distribution. We live-trapped small mammals in three regenerating stands following clearcutting. Harvested stands were bisected by...

  18. Integrated crisis management exercises

    International Nuclear Information System (INIS)

    Callen, R.B.; DeHart, R.E.

    1994-01-01

    This paper describes some of the steps that Mobil has taken to enhance their crisis management capability and to improve their readiness. The approach stretches from the individual plant level to Mobil's Corporate offices in Fairfax, Virginia. Some of the lessons learned from several integrated crisis management exercises are outlined and some areas where additional industry co-operation in crisis management could pay dividends are suggested

  19. A Continental-scale River Corridor Model to Synthesize Understanding and Prioritize Management of Water Purification Functions and Ecological Services in Large Basins

    Science.gov (United States)

    Harvey, J. W.; Gomez-Velez, J. D.; Scott, D.; Boyer, E. W.; Schmadel, N. M.; Alexander, R. B.; Eng, K.; Golden, H. E.; Kettner, A.; Konrad, C. P.; Moore, R. B.; Pizzuto, J. E.; Schwarz, G. E.; Soulsby, C.

    2017-12-01

    The functional values of rivers depend on more than just wetted river channels. Instead, the river channel exchanges water and suspended materials with adjacent riparian, floodplain, hyporheic zones, and ponded waters such as lakes and reservoirs. Together these features comprise a larger functional unit known as the river corridor. The exchange of water, solutes, and sediments within the river corridor alters downstream water quality and ecological functions, but our understanding of the large-scale, cumulative impacts is inadequate and has limited advancements in sustainable management practices. A problem with traditional watershed, groundwater, and river water quality models is that none of them explicitly accounts for river corridor storage and processing, and the exchanges of water, solutes, and sediments that occur many times between the channel and off-channel environments during a river's transport to the sea. Our River Corridor Working Group at the John Wesley Powell Center is quantifying the key components of river corridor functions. Relying on foundational studies that identified floodplain, riparian, and hyporheic exchange flows and resulting enhancement of chemical reactions at river reach scales, we are assembling the datasets and building the models to upscale that understanding onto 2.6 million river reaches in the U.S. A principal goal of the River Corridor Working group is to develop a national-scale river corridor model for the conterminous U.S. that will reveal, perhaps for the first time, the relative influences of hyporheic, riparian, floodplain, and ponded waters at large spatial scales. The simple but physically-based models are predictive for changing conditions and therefore can directly address the consequences and effectiveness of management actions in sustaining valuable river corridor functions. This presentation features interpretation of useful river corridor connectivity metrics and ponded water influences on nutrient and sediment

  20. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  1. Integrated Pest Management (IPM)

    Science.gov (United States)

    Repellents Rodenticides Other types of pesticides Disponible en español Integrated Pest Management (IPM) IPM Company: IPM is the Key - Oregon State University Extension Service Last updated May 11, 2018 Related Insecticides Natural and Biological Pesticides Repellents Rodenticides Other types of pesticides Disponible en

  2. Integrated groundwater data management

    Science.gov (United States)

    Fitch, Peter; Brodaric, Boyan; Stenson, Matt; Booth, Nathaniel; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    The goal of a data manager is to ensure that data is safely stored, adequately described, discoverable and easily accessible. However, to keep pace with the evolution of groundwater studies in the last decade, the associated data and data management requirements have changed significantly. In particular, there is a growing recognition that management questions cannot be adequately answered by single discipline studies. This has led a push towards the paradigm of integrated modeling, where diverse parts of the hydrological cycle and its human connections are included. This chapter describes groundwater data management practices, and reviews the current state of the art with enterprise groundwater database management systems. It also includes discussion on commonly used data management models, detailing typical data management lifecycles. We discuss the growing use of web services and open standards such as GWML and WaterML2.0 to exchange groundwater information and knowledge, and the need for national data networks. We also discuss cross-jurisdictional interoperability issues, based on our experience sharing groundwater data across the US/Canadian border. Lastly, we present some future trends relating to groundwater data management.

  3. Integrated parasite management

    DEFF Research Database (Denmark)

    Clausen, Jesper Hedegaard; Madsen, Henry; Van, Phan Thi

    2015-01-01

    communities at risk through mass drug administration. However, we argue that treatment alone will not reduce the risk from eating infected fish and that sustainable effective control must adopt an integrated FZT control approach based on education, infrastructure improvements, and management practices...... that target critical control points in the aquaculture production cycle identified from a thorough understanding of FZT and host biology and epidemiology. We present recommendations for an integrated parasite management (IPM) program for aquaculture farms.......Fishborne zoonotic trematodes (FZT) are an emerging problem and there is now a consensus that, in addition to wild-caught fish, fish produced in aquaculture present a major food safety risk, especially in Southeast Asia where aquaculture is important economically. Current control programs target...

  4. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  5. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  6. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  7. Integrated refinery waste management

    Energy Technology Data Exchange (ETDEWEB)

    Shieh, Y -S [ETG Environmental, Inc., Blue Bell, PA (US); Sheehan, W J [Separation and Recovery Systems, Inc., Irvine, CA (US)

    1992-01-01

    In response to the RCRA land ban regulations and TC rule promulgated by the U.S. Federal Environmental Protection Agency (EPA) in 1988-1990, an Integrated Refinery Waste Management (IRWM) program has been developed to provide cost-effective solutions to petroleum industry customers. The goal of IRWM is to provide technology based remediation treatment services to manage sludges and wastewaters generated from the oil refining processes, soils contaminated with petroleum distillates and groundwater contaminated with fuels. Resource recovery, volume reduction and waste minimization are the primary choices to mitigate environmental problems. Oil recovery has been performed through phase separation (such as centrifugation and filtration) and heating of heavy oils. Volume reduction is achieved by dewatering systems such as centrifuges and filter presses, and low temperature thermal treatment. Waste minimization can be accomplished by bioremediation and resource recovery through a cement kiln. (Author).

  8. Long Island Smart Energy Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Mui, Ming [Long Island Power Authority, Uniondale, NY (United States)

    2015-02-04

    The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential

  9. Integrated Disability Management

    Directory of Open Access Journals (Sweden)

    Silvia Angeloni

    2013-10-01

    Full Text Available This article sets out to increase awareness regarding the wide and universal significance of disability, as well as the important benefits of an Integrated Disability Management (IDM approach. The scientific basis for IDM is explored in the first place through an analysis of its relationship to the International Classification of Functioning, Disability and Health (ICF. The conceptual paradigm of the ICF shares an ideological position with the IDM approach in that they are both underpinned by dynamic and multidimensional constructions of disability, which imply equally holistic and interdisciplinary responses. The IDM approach can be applied across a diversity of human situations to provide solutions that reflect the multifaceted and widespread nature of disability. The IDM approach is intended as a strategy capable of handling: inclusion of people with disabilities, active aging of human resources, health and safety in the workplace, prevention of disabilities and various diseases, return-to-work, absenteeism, and presenteeism.

  10. Corridor X in Serbia: Approach to spatial planning

    Directory of Open Access Journals (Sweden)

    Milijić Saša

    2003-01-01

    Full Text Available For the infrastructural corridor's area, of the national importance, is predicted making spatial plans of area of special use, as the most complex instruments for the developing and arranging management of these areas. These plans should have an integrative and problem-oriented approach towards development planning and arrangement of such an area, and it is obliged to include: a complex evaluation of state and function of infrastructural system in the corridor; an analysis of infrastructural corridor influence on the development of the planning area and its surrounding; an alternative conception of long-term protection, improvement, organization and use of the planning area; a choice of the priorities and assumption of the realization phases; instructions for the implementation of the plan etc. The approach in making of this category of plans, as well as, experiences in planning, arrangement and use of multimodal corridors, have been considered on the example of Spatial plan of the infrastructural corridor E-75 section Belgrade-Nis area.

  11. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  12. Integrated pest management

    International Nuclear Information System (INIS)

    LaBrecque, G.C.

    1981-01-01

    An effective Integrated Pest Management (IPM) programme requires a thorough knowledge of the biology of the target species, namely information on the dispersal, population densities and dynamics as well as the ecology of the natural enemies of the pest. Studies on these can be accomplished by radiolabelling techniques. In the event that conditions prevent the use of radioisotopes the insects can be labelled with either a rare earth or stable isotopes. All insects treated with the rare earths, once captured, are exposed to neutrons which produce radioactivity in the rare earths. There are two other approaches in the practical application of radiation to the problem of insect control: the exposure of insects to lethal doses of radiation and the release of sterile insects. The Insect and Pest Control Section contributes to all aspects of the sterile insect technique (SIT) and it is involved in the Agency's Coordinated Research Programme which permits scientists from the developing countries to meet to discuss agricultural problems and to devise means of solving crop-pest infestation problems by using isotopes and radiation. The success of radiation in insect pest control was underlined and reviewed at the international symposium on the sterile insect technique and the use of radiation in genetic insect control jointly organized by the FAO and the IAEA and held in the FRG in 1981. Another important action is the BICOT programme in Nigeria between the IAEA and the Government of Nigeria on the biological control of tsetse flies by SIT

  13. Dynamic network expansion, contraction, and connectivity in the river corridor of mountain stream network

    Science.gov (United States)

    Ward, A. S.; Schmadel, N.; Wondzell, S. M.

    2017-12-01

    River networks are broadly recognized to expand and contract in response to hydrologic forcing. Additionally, the individual controls on river corridor dynamics of hydrologic forcing and geologic setting are well recognized. However, we currently lack tools to integrate our understanding of process dynamics in the river corridor and make predictions at the scale of river networks. In this study, we develop a perceptual model of the river corridor in mountain river networks, translate this into a reduced-complexity mechanistic model, and implement the model in a well-studied headwater catchment. We found that the river network was most sensitive to hydrologic dynamics under the lowest discharges (Qgauge managers of water resources who need to estimate connectivity and flow initiation location along the river corridor over broad, unstudied catchments.

  14. The Cargo Fare Class Mix problem for an intermodal corridor : revenue management in synchromodal container transportation

    NARCIS (Netherlands)

    van Riessen, B.; Negenborn, R.R.; Dekker, Rommert

    2017-01-01

    The intermodal hinterland transportation of maritime containers is under pressure from port authorities and shippers to achieve a more integrated, efficient network operation. Current optimisation methods in literature yield limited results in practice, though, as the transportation product

  15. The Cargo Fare Class Mix problem for an intermodal corridor: revenue management in synchromodal container transportation

    NARCIS (Netherlands)

    B. van Riessen (Bart); R.R. Negenborn (Rudy); R. Dekker (Rommert)

    2017-01-01

    textabstractThe intermodal hinterland transportation of maritime containers is under pressure from port authorities and shippers to achieve a more integrated, efficient network operation. Current optimisation methods in literature yield limited results in practice, though, as the transportation

  16. Green corridors basics

    DEFF Research Database (Denmark)

    Panagakos, George

    2016-01-01

    SuperGreen project, which aimed at advancing the green corridor concept through a benchmarking exercise involving Key Performance Indicators (KPIs). The chapter discusses the available definitions of green corridors and identifies the characteristics that distinguish a green corridor from any other...... efficient surface transportation corridor. After providing examples of green corridor projects in Europe, it focuses on the KPIs that have been proposed by various projects for monitoring the performance of a freight corridor. Emphasis is given to the SuperGreen KPIs, covering the economic, technical...

  17. Integral control for population management.

    Science.gov (United States)

    Guiver, Chris; Logemann, Hartmut; Rebarber, Richard; Bill, Adam; Tenhumberg, Brigitte; Hodgson, Dave; Townley, Stuart

    2015-04-01

    We present a novel management methodology for restocking a declining population. The strategy uses integral control, a concept ubiquitous in control theory which has not been applied to population dynamics. Integral control is based on dynamic feedback-using measurements of the population to inform management strategies and is robust to model uncertainty, an important consideration for ecological models. We demonstrate from first principles why such an approach to population management is suitable via theory and examples.

  18. Evaluation of diversion strategies in the context of advanced traffic management systems (ATMS) for an urban traffic corridor with heterogeneous traffic

    Energy Technology Data Exchange (ETDEWEB)

    Korlapati, D.R.

    2007-07-01

    Due to urbanization and accelerated growth in vehicular traffic, most big cities in India face problems related to traffic management resulting in severe congestion, pollution, and a high rate of accidents during peak hours. Lane blocking incidents on arterials or urban traffic corridors cause major disruption to traffic flow. Peak hour congestion with low average speeds and high accident rates are commonly associated with traffic in major cities in India. The situation is deteriorating further as creation of new facilities are almost impossible, with resource and space constraints. In such scenarios, application of advanced technologies seems to offer hope. One such application area is Advanced Traffic Management Systems (ATMS), a component of intelligent transportation system (ITS). Due to the unique traffic characteristics prevailing in India, the application of such systems needs to first be evaluated before implementation. This paper proposed a research methodology for the evaluation of diversion strategies in the context of ATMS for an urban corridor in India. The evaluation framework combined several relevant modules related to various aspects of traffic control, surveillance and advisory. As part of this study, a simulation model and a simulation optimization model were developed. The simulation model was microscopic in nature and captured the driver behaviour and traffic characteristics realistically by modeling the complex interactions among vehicles traversing a corridor. It was concluded that the results and observations were useful indicators to gauge the potential success of diversion plans. 10 refs., 1 tab., 2 figs.

  19. Integrated Information Management (IIM)

    National Research Council Canada - National Science Library

    McIlvain, Jason

    2007-01-01

    Information Technology is the core capability required to align our resources and increase our effectiveness on the battlefield by integrating and coordinating our preventative measures and responses...

  20. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  1. Integrated data management for RODOS

    International Nuclear Information System (INIS)

    Abramowicz, K.; Koschel, A.; Rafat, M.; Wendelgass, R.

    1995-12-01

    The report presents the results of a feasibility study on an integrated data organisation and management in RODOS, the real-time on-line decision support system for off-site nuclear emergency management. The conceptual design of the functional components of the integrated data management are described taking account of the software components and the operation environment of the RODOS system. In particular, the scheme architecture of a database integration manager for accessing and updating a multi-database system is discussed in detail under a variety of database management aspects. Furthermore, the structural design of both a simple knowledge database and a real-time database are described. Finally, some short comments on the benefits and disadvantages of the proposed concept of data integration in RODOS are given. (orig.) [de

  2. Applying circuit theory for corridor expansion and management at regional scales: tiling, pinch points, and omnidirectional connectivity.

    Directory of Open Access Journals (Sweden)

    David Pelletier

    Full Text Available Connectivity models are useful tools that improve the ability of researchers and managers to plan land use for conservation and preservation. Most connectivity models function in a point-to-point or patch-to-patch fashion, limiting their use for assessing connectivity over very large areas. In large or highly fragmented systems, there may be so many habitat patches of interest that assessing connectivity among all possible combinations is prohibitive. To overcome these conceptual and practical limitations, we hypothesized that minor adaptation of the Circuitscape model can allow the creation of omnidirectional connectivity maps illustrating flow paths and variations in the ease of travel across a large study area. We tested this hypothesis in a 24,300 km(2 study area centered on the Montérégie region near Montréal, Québec. We executed the circuit model in overlapping tiles covering the study region. Current was passed across the surface of each tile in orthogonal directions, and then the tiles were reassembled to create directional and omnidirectional maps of connectivity. The resulting mosaics provide a continuous view of connectivity in the entire study area at the full original resolution. We quantified differences between mosaics created using different tile and buffer sizes and developed a measure of the prominence of seams in mosaics formed with this approach. The mosaics clearly show variations in current flow driven by subtle aspects of landscape composition and configuration. Shown prominently in mosaics are pinch points, narrow corridors where organisms appear to be required to traverse when moving through the landscape. Using modest computational resources, these continuous, fine-scale maps of nearly unlimited size allow the identification of movement paths and barriers that affect connectivity. This effort develops a powerful new application of circuit models by pinpointing areas of importance for conservation, broadening the

  3. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go undetected...

  4. Systems engineering management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the : operation of freeways, arterials, and public transit. The system will be shared between information syst...

  5. Adaptive and integrated water management

    NARCIS (Netherlands)

    Pahl-Wostl, C.; Kabat, P.; Möltgen, J.

    2007-01-01

    Sustainable water management is a key environmental challenge of the 21st century. Developing and implementing innovative management approaches and how to cope with the increasing complexity and uncertainties was the theme of the first International Conference on Adaptive and Integrated Water

  6. Integrated coastal management in Uruguay

    International Nuclear Information System (INIS)

    2011-01-01

    Integrated coastal management in Uruguay Carmelo includes the following areas-Nueva Palmira challenges and opportunities for local development in a context of large-scale industrial (Conchillas Uruguay), coastal management and stream Arroyo Solis Solis Chico Grande, Punta Colorada and Punta Negra, Maldonado Province Arroyo Valizas and sustainable tourism.

  7. Networking of integrated pest management

    NARCIS (Netherlands)

    Lamichhane, Jay Ram; Aubertot, Jean Noël; Begg, Graham; Birch, Andrew Nicholas E.; Boonekamp, Piet; Dachbrodt-Saaydeh, Silke; Hansen, Jens Grønbech; Hovmøller, Mogens Støvring; Jensen, Jens Erik; Jørgensen, Lise Nistrup; Kiss, Jozsef; Kudsk, Per; Moonen, Anna Camilla; Rasplus, Jean Yves; Sattin, Maurizio; Streito, Jean Claude; Messéan, Antoine

    2016-01-01

    Integrated pest management (IPM) is facing both external and internal challenges. External challenges include increasing needs to manage pests (pathogens, animal pests and weeds) due to climate change, evolution of pesticide resistance as well as virulence matching host resistance. The complexity

  8. Evaluating the use of operational management techniques for capacity improvements on shared-use rail corridors : final report.

    Science.gov (United States)

    2016-01-01

    The majority of intercity passenger and commuter rail services in the United States (U.S.) operate on the shared-use corridors with : freight rail services. These types of operations tend to be challenging for efficient capacity utilization and relia...

  9. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  10. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  11. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  12. Reclaiming deserted corridors: Rights of way as common property resources

    International Nuclear Information System (INIS)

    Brown, D.T.

    1993-01-01

    In Canada, power line transmission corridors are administered and maintained by provincial crown utilities. These corridors have fragmented natural habitats, destroyed biota, and disrupted geological and hydrologic systems. The practices used by utilities to maintain their rights-of-way tend to worsen the environmental and social context of the localities affected by the corridors. If the corridors are considered as common resources, and if co-management of these resources is undertaken involving the utilities and the communities affected by the corridors, public rights-of-way would be created which would have environmental benefits. These corridors would have a recreational potential and could be managed so as to reduce considerably the negative impacts presently generated by current right-of-way management practices. The use of local residents in this management process could ensure that the use of the corridors harmonizes with local needs. Among the obstacles to the co-management of these corridors are the badly defined policies of secondary land use, the restrictions on vegetation maintenance in utility corridors, lengthy approvals processes, and concerns about public liability. To make co-management of these corridors a reality, new policy structures and new procedures have to be developed in cooperation with the utilities and the affected communities. 14 refs., 1 fig

  13. The significance of the Danube ecological corridor in the proceedings of implementing ecological networks in Serbia

    Directory of Open Access Journals (Sweden)

    Filipović Dejan

    2015-01-01

    Full Text Available With the modern processes for exploiting land people have altered the original appearance of areas and created cultural environments. The remaining natural environments, whether protected or not, take up a relatively small portion of space and represent isolated islands which in itself can not be sufficient for the preservation of biodiversity or for the fulfillment of national, regional or international goals and commitments related to their preservation. In order to secure the preservation of biodiversity, the strengthening of integrity and the natural processes, such as animal migrations, succession of vegetation and evolution processes, the communication between natural habitats is imperative. Ecological corridors, as integral elements of ecological networks, ensure the preservation of vital ecological interactions by providing a connection between different habitats or areas. Depending on a range of factors, from the fulfillment of demands of different species to the connecting of regions, corridors of local, sub-regional, regional and international importance are identified. The Danube ecological corridor is one of the most significant corridors of international importance which encompasses a large number of habitats which are part of the natural watercourse of the corridor. There are numerous protected areas in the Danube coastal area on Serbia's territory which present themselves as central areas for forming the ecological network, such as: Gornje Podunavlje, Karađorđevo, Fruška Gora, Titelski Breg hill, Kovalski rit marsh, Dunavski loess bluffs, the Sava mouth, Labudovo okno, Deliblato sands, Đerdap and Mala Vrbica. The diverse and mosaic vegetation of the floodplain, as well as the consistency of the protected areas within the Danube corridor have a direct influence on the quality and functionality of this corridor. The goal of this paper is to show the significance of the Danube ecological corridor in the process of implementing

  14. The Chaschuil region of like corridor of Goods, energy and information; pre hispanic Integration between Puna and the Boston de Flambala

    International Nuclear Information System (INIS)

    Ratto, Norma; Pla, Rita; Orgaz, Martin; Fuente, Guillermo de la

    2001-01-01

    In this work the relevance of the chascuil region like corridor of goods of energy circulation are discussed, goods of information from times of the societies agroalfareras until the Inca presence in the region being constituted in one of the multiple roads or circulation routes that integrated the territories of the This with the West, of one and another side of the Andean mountain range of the southern sector of the South American knowledge The NAA is an analytic technique that gathers the basic requirements of sensibility, precision, accuracy and necessary selectivity for the discussion of archaeological problems of origin, contacts, trade exchange and pottery production like likewise to reconstruct the socieconomias Inter. and intra populations of the past

  15. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  16. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  17. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  18. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  19. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  20. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  1. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  2. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  3. ASPECTS OF INTEGRATION MANAGEMENT METHODS

    Directory of Open Access Journals (Sweden)

    Artemy Varshapetian

    2015-10-01

    Full Text Available For manufacturing companies to succeed in today's unstable economic environment, it is necessary to restructure the main components of its activities: designing innovative product, production using modern reconfigurable manufacturing systems, a business model that takes into account the global strategy and management methods using modern management models and tools. The first three components are discussed in numerous publications, for example, (Koren, 2010 and is therefore not considered in the article. A large number of publications devoted to the methods and tools of production management, for example (Halevi, 2007. On the basis of what was said in the article discusses the possibility of the integration of only three methods have received in recent years, the most widely used, namely: Six Sigma method - SS (George et al., 2005 and supplements its-Design for six sigm? - DFSS (Taguchi, 2003; Lean production transformed with the development to the "Lean management" and further to the "Lean thinking" - Lean (Hirano et al., 2006; Theory of Constraints, developed E.Goldratt - TOC (Dettmer, 2001. The article investigates some aspects of this integration: applications in diverse fields, positive features, changes in management structure, etc.

  4. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    One of the problems in the building industry is a limited degree of learning from experiences of use and operation of existing buildings. Development of professional facilities management (FM) can be seen as the missing link to bridge the gap between building operation and building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures...... on literature studies and case studies from the Nordic countries in Europe, including research reflections on experiences from a main case study, where the author, before becoming a university researcher, was engaged in the client organization as deputy project director with responsibility for the integration...

  5. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  6. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  7. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  8. The Integrated Mode Management Interface

    Science.gov (United States)

    Hutchins, Edwin

    1996-01-01

    Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the

  9. Integrated emergency management in KKG

    International Nuclear Information System (INIS)

    Kluegel, J.U.; Plank, H.

    2007-01-01

    The development and introduction of emergency measures in Switzerland was mainly characterized by the evaluation of international experience and by systematic analysis of beyond-design basis accidents within the framework of plant-specific probabilistic safety analyses. As early as in the mid-eighties, the Swiss regulatory authority demanded that measures be taken against severe accidents, and periodically added more detailed requirements, most recently in 2000 when the introduction of Severe Accident Management Guidelines (SMAG) was demanded for power operation as well as operation in the non-power mode. The SMAG were introduced at the Goesgen nuclear power station within a project in the period between 2003 and 2005. For this purpose, a concept of integrated emergency management was developed which is based on updates of the proven emergency manual. One important aspect of this integrative concept is the distinction between preventive and mitigating procedures by defining appropriate criteria. The findings made in the implementation phase of the project include the realization that the introduction of procedures dealing with severe accidents also requires the ability to develop new ways of thinking and acting in accident management. This implies the awareness that procedures covering severe accidents must be applied much more flexibly and in the light of the situation than regulations covering fault conditions. Also possibilities to simulate severe accidents were created within the project both for the development of procedures and for training plant operators and members of the emergency staff. (orig.)

  10. From corridor to region

    DEFF Research Database (Denmark)

    Jensen, Anne; Jespersen, Per Homann

    2006-01-01

    The corridor between Oslo and Berlin is by the politicians of the regional authorities in the Scandinavian part of the corridor seen a region with unique qualities and a large innovation and growth potential. In order to explore and develop this potential an In-terreg project has been launched...... this task by applying principles of participative planning and with action research methodology are involving stakeholders in the process of defining, developing and disseminating the idea of the Corridor of Innovation and Cooperation - COINCO....

  11. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  12. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  13. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  14. Distribution Integrity Management Plant (DIMP)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzales, Jerome F. [Los Alamos National Laboratory

    2012-05-07

    This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP{trademark}) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP{trademark} uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP{trademark} advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records

  15. River Corridor Easements

    Data.gov (United States)

    Vermont Center for Geographic Information — A River Corridor Easement (RCE) is an area of conserved land adjacent to a river or stream that was conserved to permanently protect the lateral area the river needs...

  16. Metro Conservation Corridors

    Data.gov (United States)

    Minnesota Department of Natural Resources — The Metro Conservation Corridors (MeCC) grow out of the natural resource analysis work done by the DNR in the late '90's, documented in the Metro Greenprint...

  17. INTEGRATED SUSTAINABLE MANGROVE FOREST MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cecep Kusmana

    2015-07-01

    Full Text Available Mangrove forest as a renewable resource must be managed based on sustainable basis in which the benefits of ecological, economic and social from the forest have to equity concern in achieving the optimum forest products and services in fulfill the needs of recent generation without destruction of future generation needs and that does not undesirable effects on the physical and social environment. This Sustainable Forest Management (SFM practices needs the supporting of sustainability in the development of social, economic and environment (ecological sounds simultaneously, it should be run by the proper institutional and regulations. In operational scale, SFM need integration in terms of knowledge, technical, consultative of stakeholders, coordination among sectors and other stakeholders, and considerations of ecological inter-relationship in which mangroves as an integral part of both a coastal ecosystem and a watershed (catchment area. Some tools have been developed to measure the performent of SFM, such as initiated by ITTO at 1992 and followed by Ministry of Forestry of Indonesia (1993, CIFOR (1995, LEI (1999, FSC (1999, etc., however, the true nuance of SFM’s performance is not easy to be measured. 

  18. Integrated Work Management: Overview, Course 31881

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-30

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

  19. Mobility Case Studies : Where Integrated Corridor Management Has Worked and Why

    Science.gov (United States)

    2018-01-11

    Background: Modifying the task load of Emergency Medical Services (EMS) personnel may mitigate fatigue, sleep quality and fatigue related risks. A review of the literature addressing task load interventions may benefit EMS administrators as they craf...

  20. Integrated corridor management initiative : demonstration phase evaluation. Dallas institutional and organizational analysis test plan.

    Science.gov (United States)

    2000-10-01

    The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...

  1. IDMT, Integrated Decommissioning Management Tools

    International Nuclear Information System (INIS)

    Alemberti, A.; Castagna, P.; Marsiletti, M.; Orlandi, S.; Perasso, L.; Susco, M.

    2005-01-01

    Nuclear Power Plant decommissioning requires a number of demolition activities related to civil works and systems as well as the construction of temporary facilities used for treatment and conditioning of the dismantled parts. The presence of a radiological, potentially hazardous, environment due to the specific configuration and history of the plant require a professional, expert and qualified approach approved by the national safety authority. Dismantling activities must be designed, planned and analysed in detail during an evaluation phase taking into account different scenarios generated by possible dismantling sequences and specific waste treatments to be implemented. The optimisation process of the activities becomes very challenging taking into account the requirement of the minimisation of the radiological impact on exposed workers and people during normal and accident conditions. While remote operated equipment, waste treatment and conditioning facilities may be designed taking into account this primary goal also a centralised management system and corresponding software tools have to be designed and operated in order to guarantee the fulfilment of the imposed limits as well as the traceability of wastes. Ansaldo Nuclear Division has been strongly involved in the development of a qualified and certified software environment to manage the most critical activities of a decommissioning project. The IDMT system (Integrated Decommissioning Management Tools) provide a set of stand alone user friendly applications able to work in an integrated configuration to guarantee waste identification, traceability during treatment and conditioning process as well as location and identification at the Final Repository site. Additionally, the system can be used to identify, analyse and compare different specific operating scenarios to be optimised in term of both economical and radiological considerations. The paper provides an overview of the different phases of

  2. Site-occupany of bats in relation to forested corridors

    Science.gov (United States)

    Chris D Hein; Steven B Castleberry; Karl V. Miller

    2009-01-01

    Although use of corridors by some wildlife species has been extensively examined, use by bats is poorly understood. From 1 June to 31 August (2004~200S), we used Anabat II detectors to examine bat activity and species occupancy relative to forested corridors on an intensively managed forest landscape in southern South Carolina, USA. We...

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  4. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  5. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  6. Integrated resource management of biomass

    International Nuclear Information System (INIS)

    Goodwin, E.R.

    1992-01-01

    An overview is presented of the use of biomass, with emphasis on peat, as an alternative energy source, from an integrated resource management perspective. Details are provided of the volume of the peat resource, economics of peat harvesting, and constraints to peat resource use, which mainly centre on its high water content. Use of waste heat to dry peat can increase the efficiency of peat burning for electric power generation, and new technologies such as gasification and turbo expanders may also find utilization. The burning or gasification of biomass will release no more carbon dioxide to the atmosphere than other fuels, has less sulfur content than solid fuels. The removal of peat reduces methane emissions and allows use of produced carbon dioxide for horticulture and ash for fertilizer, and creates space that may be used for forestry or agricultural biomass growth. 38 refs

  7. Integrated weed management in wheat

    International Nuclear Information System (INIS)

    Marwat, K.B.; Khan, M.A.; Nawab, K.; Khattak, A.M.

    2011-01-01

    The paper summarizes the results of an experiment conducted on wheat at Kohat, Khyber Pakhtunkhwa, Pakistan during winter 2004-05. Randomized complete block design with split-split-plot arrangement was used where wheat line and broadcast sowing were kept in main plots. Seed rates (100 and 150 kg ha-1) were assigned as sub-plots, while four herbicides (Topik, Isoproturon, Puma super and Buctril super) and weed check were assigned to sub-sub-plots. Results revealed that higher biological yield was recorded in line sowing. However, higher wheat seed rate decreased weed biomass and increased biological yield. Herbicides proved to be effective in decreasing weed biomass and enhancing grain yield and its contributing traits. It was suggested that line sowing in combination with higher seeding rate and Buctril super should be used in an integrated weed management fashion. However further studies are required to investigate various ranges of seeding rate and herbicides doses. (author)

  8. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  9. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  10. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  11. River Corridors (Jan 2, 2015)

    Data.gov (United States)

    Vermont Center for Geographic Information — River corridors are delineated to provide for the least erosive meandering and floodplain geometry toward which a river will evolve over time. River corridor maps...

  12. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  13. Integrated management of childhood illness

    Directory of Open Access Journals (Sweden)

    1997-01-01

    Full Text Available Millones de defunciones en niños menores de 5 años se podrían prevenir en países en desarrollo si se aplicaran las medidas de control y los tratamientos eficaces que se usan normalmente en países desarrollados. Conscientes de la necesidad de hacer frente a las principales causas de enfermedad y muerte en la infancia (infecciones respiratorias agudas, enfermedades diarreicas, desnutrición, malaria y enfermedades prevenibles por medio de la vacunación mediante una iniciativa global, la OMS y el UNICEF han desarrollado una estrategia conocida por Atención Integrada de las Enfermedades Prevalentes de la Infancia (Integrated Management of Childhood Illness, IMCI. Sus oficinas regionales para las Américas, que son la OPS y el UNICEF-TACRO, han aceptado los objetivos y actividades descritos en el presente informe a fin de reorientar su labor y dirigirla hacia el mejoramiento del estado de salud infantil en este hemisferio.

  14. Evaluating landscape options for corridor restoration between giant panda reserves.

    Directory of Open Access Journals (Sweden)

    Fang Wang

    Full Text Available The establishment of corridors can offset the negative effects of habitat fragmentation by connecting isolated habitat patches. However, the practical value of corridor planning is minimal if corridor identification is not based on reliable quantitative information about species-environment relationships. An example of this need for quantitative information is planning for giant panda conservation. Although the species has been the focus of intense conservation efforts for decades, most corridor projects remain hypothetical due to the lack of reliable quantitative researches at an appropriate spatial scale. In this paper, we evaluated a framework for giant panda forest corridor planning. We linked our field survey data with satellite imagery, and conducted species occupancy modelling to examine the habitat use of giant panda within the potential corridor area. We then conducted least-cost and circuit models to identify potential paths of dispersal across the landscape, and compared the predicted cost under current conditions and alternative conservation management options considered during corridor planning. We found that due to giant panda's association with areas of low elevation and flat terrain, human infrastructures in the same area have resulted in corridor fragmentation. We then identified areas with high potential to function as movement corridors, and our analysis of alternative conservation scenarios showed that both forest/bamboo restoration and automobile tunnel construction would significantly improve the effectiveness of corridor, while residence relocation would not significantly improve corridor effectiveness in comparison with the current condition. The framework has general value in any conservation activities that anticipate improving habitat connectivity in human modified landscapes. Specifically, our study suggested that, in this landscape, automobile tunnels are the best means to remove current barriers to giant panda

  15. Integrated Work Management: Preparer, Course 31883

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.

  16. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  17. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  18. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  19. Integrated management of waterbirds: Beyond the conventional

    Science.gov (United States)

    Erwin, R.M.; Parsons, Katharine C.; Brown, Stephen C.; Erwin, R. Michael; Czech, Helen A.; Coulson, John C.

    2002-01-01

    Integrated waterbird management over the past few decades has implicitly referred to methods for managing wetlands that usually attempt to enhance habitat for taxonomic groups such as shorebirds and wading birds, in addition to waterfowl, the traditional focus group. Here I describe five elements of integration in management: taxonomic, spatial, temporal, population and habitat, and multiple-use management objectives. Spatial integration simply expands the scale of management concern. Rather than emphasizing management on a very limited number of impoundments or wetlands in small refuges or wildlife management areas, the vision is beginning to shift to connectivity within larger landscapes on the order of many square kilometers as telemetry data on daily and seasonal movements for many species become available. Temporal integration refers to the potential for either simultaneous management for waterbirds and commercial 'crops' (e.g., crayfish and rice) or for temporally-staggered management such as row crop production in spring-summer growing seasons and waterbird management on fallow fields in the non-growing (winter) season. Integrating population dynamics with habitats has become a major research focus over the past decade. Identifying which wetlands are ?sources? or ?sinks? for specific populations provides managers with critical information about effective management. Further, the applications of spatially explicit population models place heavy demands on researchers to identify use patterns for breeding and dispersing individuals by age, sex, and reproductive class. Population viability analysis models require much the same information. Finally, multiple-use management integration refers to trying to optimize the uses of wetlands, when only one (perhaps secondary) use may include waterbird management. Depending upon the ownership and primary land use of a particular parcel of land containing wetlands and/or water bodies, managing for waterbirds may be an

  20. A Model for Assessing Pedestrian Corridors. Application to Vitoria-Gasteiz City (Spain

    Directory of Open Access Journals (Sweden)

    Javier Delso

    2017-03-01

    Full Text Available From a mobility perspective, walking is considered to be the most sustainable transport mode. One of the consequences of motor-oriented urban configuration on pedestrian mobility is urban fragmentation, which affects sustainability in cities. In this paper, we use a natural-based approach to landscape fragmentation and connectivity (inherited from landscape ecology for pedestrian mobility planning. Our aim is to design a useful methodology to identify priority pedestrian corridors, and to assess the effects of implementing barrier-free pedestrian corridors in the city. For this purpose, we developed a method that integrates Geographical Information Systems (GIS network analysis with kernel density methods, which are commonly used for designating habitat corridors. It was applied to Vitoria-Gasteiz (Spain. Pedestrian mobility was assessed by comparison of travel times between different scenarios. Results show that the implementation of pedestrian corridors reduces travel time by approximately 6%. Thus, an intervention in a small percentage of the city’s street network could considerably reduce pedestrian travel times. The proposed methodology is a useful tool for urban and transport planners to improve pedestrian mobility and manage motorised traffic.

  1. Export channel pricing management for integrated solutions

    OpenAIRE

    Roine, Henna; Sainio, Liisa-Maija; Saarenketo, Sami

    2012-01-01

    This article studies systems integrators' export channel pricing management for integrated solutions. We find support from our empirical case study for the notion that a systems integrator's export channel pricing strategy is multidimensional and dependent on international pricing environment and partner characteristics and that export partnerships have unique implications on a systems integrator's pricing process. The results show that giving up pricing control in export channel context may ...

  2. Integrated solid waste management in Germany

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report covers Germany`s experience with integrated solid waste management programs. The municipal solid waste practices of four cities include practices and procedures that waste facility managers with local or state governments may consider for managing their own day-to-day operations.

  3. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  4. Integrated Work Management: PIC, Course 31884

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-08

    The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

  5. Transaction management with integrity checking

    DEFF Research Database (Denmark)

    Martinenghi, Davide; Christiansen, Henning

    2005-01-01

    Database integrity constraints, understood as logical conditions that must hold for any database state, are not fully supported by current database technology. It is typically up to the database designer and application programmer to enforce integrity via triggers or tests at the application level....... 2.~In concurrent database systems, besides the traditional correctness criterion, the execution schedule must ensure that the different transactions can overlap in time without destroying the consistency requirements tested by other, concurrent transactions....

  6. Global challenges in integrated coastal zone management

    DEFF Research Database (Denmark)

    integration of data and information in policy and management, combining expertise from nature and social science, to reach a balanced and sustainable development of the coastal zone. This important book comprises the proceedings of The International Symposium on Integrated Coastal Zone Management, which took....../mitigation to change in coastal systems Coastal governance Linking science and management Comprising a huge wealth of information, this timely and well-edited volume is essential reading for all those involved in coastal zone management around the globe. All libraries in research establishments and universities where...

  7. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    intern

    implementation of health facility based Integrated Management of Childhood Illness ... community-owned resource persons (CORPs) to provide health education to care ... differing coverage of basic essential services such safe water supply, ...

  8. AN ASSESSMENT OF THE INTEGRATED PEST MANAGEMENT ...

    African Journals Online (AJOL)

    Integrated Pest Management Collaborative Research Support Program) has been applying a farmer participatory IPM strategy at on-farm research sites in eastern Uganda since 1995. Following five years of project implementation an evaluation ...

  9. Integrated Data for Improved Asset Management

    Science.gov (United States)

    2016-05-26

    The objective of this research is to demonstrate the potential benefits for agency-wide data integration for VDOT asset management. This objective is achieved through an example application that requires information distributed across multiple databa...

  10. Supplement Analysis for the Transmission System Vegetation Management Program (DOE/EIS-0285/SA-113-1) Updates 9/27/02 SA-113 - Big Eddy-Ostrander Transmission Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Hutchinson, Kenneth [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-12-02

    To perform remedial vegetation management for keeping vegetation a safe distance away from electric power facilities and controlling noxious weeds within a section of BPA's Big Eddy-Ostrander Transmission Corridor. During a site review conducted in late fall of 2001, the inspector observed various species of hardwood trees resprouted from stumps. The new vegetative growth encroached on the required “Minimum Safe Distance” between the top of vegetation and the conductor cables. The management action is necessary to reduce the current and potential future hazards that tall-growing vegetation poses to transmission conductors. In addition, BPA will include weed control as part of their remedial vegetation management action. Noxious weeds occur within the corridor. Under a 1999 Executive Order, all federal agencies are required to detect and control noxious weeds. In addition, BPA is required under the 1990 amendment to the Noxious Weed Act (7 USC 2801-2814) to manage undesirable plants on federal land. Also, the Bonneville Power Administration (BPA) has responsibility to manage noxious weeds under the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS).1 State statutes and regulations also mandate action by BPA and the USFS to control noxious weeds. The Oregon Department of Agriculture (ODA) has requested that agencies aggressively control these weeds before additional spread occurs.

  11. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  12. Integrated Solution Support System for Water Management

    NARCIS (Netherlands)

    Kassahun, A.; Blind, M.; Krause, A.U.M.; Roosenschoon, O.R.

    2008-01-01

    Solving water management problems involves technical, social, economic, political and legal challenges and thus requires an integrated approach involving people from different backgrounds and roles. The integrated approach has been given a prominent role within the European Union¿s Water Framework

  13. Integrating Sustainable Development into Operations Management Courses

    Science.gov (United States)

    Fredriksson, Peter; Persson, Magnus

    2011-01-01

    Purpose: It is widely acknowledged that aspects of sustainable development (SD) should be integrated into higher level operations management (OM) education. The aim of the paper is to outline the experiences gained at Chalmers University of Technology in Sweden from integrating aspects of SD into OM courses. Design/methodology/approach: The paper…

  14. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  15. Partnering and integrated supply management

    DEFF Research Database (Denmark)

    Bjarnø, Ole-Christian; Olsen, Anders; Thyssen, Mikael

    2003-01-01

    for strategic management of collaborative relationships on a line with the purchasing perspectives offered by Supply Chain Management. Based on a study of the literature and an in-depth case study carried out within a large Scandinavian contractor, this article gives a proposal for how Partnering can...... be supported by strategic purchasing, with the aim of achieving strategic Partnering. The contribution of this article is thus the development of a new purchasing perspective within Construction Supply Chain Management.......Developments in the construction industry, with a lack of productivity increases compared to manufacturing industry in general, have amongst other things led to the use of Partnering, which is a form of collaboration which attempts to counteract the distrust and the sub-optimisation which...

  16. Managing harvest and habitat as integrated components

    Science.gov (United States)

    Osnas, Erik; Runge, Michael C.; Mattsson, Brady J.; Austin, Jane E.; Boomer, G. S.; Clark, R. G.; Devers, P.; Eadie, J. M.; Lonsdorf, E. V.; Tavernia, Brian G.

    2014-01-01

    In 2007, several important initiatives in the North American waterfowl management community called for an integrated approach to habitat and harvest management. The essence of the call for integration is that harvest and habitat management affect the same resources, yet exist as separate endeavours with very different regulatory contexts. A common modelling framework could help these management streams to better understand their mutual effects. Particularly, how does successful habitat management increase harvest potential? Also, how do regional habitat programmes and large-scale harvest strategies affect continental population sizes (a metric used to express habitat goals)? In the ensuing five years, several projects took on different aspects of these challenges. While all of these projects are still on-going, and are not yet sufficiently developed to produce guidance for management decisions, they have been influential in expanding the dialogue and producing some important emerging lessons. The first lesson has been that one of the more difficult aspects of integration is not the integration across decision contexts, but the integration across spatial and temporal scales. Habitat management occurs at local and regional scales. Harvest management decisions are made at a continental scale. How do these actions, taken at different scales, combine to influence waterfowl population dynamics at all scales? The second lesson has been that consideration of the interface of habitat and harvest management can generate important insights into the objectives underlying the decision context. Often the objectives are very complex and trade-off against one another. The third lesson follows from the second – if an understanding of the fundamental objectives is paramount, there is no escaping the need for a better understanding of human dimensions, specifically the desires of hunters and nonhunters and the role they play in conservation. In the end, the compelling question is

  17. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  18. Integrated pest management - an overview and update

    Science.gov (United States)

    Thomas D. Landis; R. Kasten Dumroese

    2014-01-01

    Integrated pest management, better known as IPM, is a familiar term for those of us working in forest, conservation, and native plant nurseries. An almost synonymous concept is "holistic pest management" that has been the topic of chapters in recent Agriculture Handbooks that would be useful to growers of native plants (see Landis and others 2009; Landis and...

  19. Integration of operational research and environmental management

    NARCIS (Netherlands)

    Bloemhof - Ruwaard, J.M.

    1996-01-01


    The subject of this thesis is the integration of Operational Research and Environmental Management. Both sciences play an important role in the research of environmental issues. Part I describes a framework for the interactions between Operational Research and Environmental Management.

  20. Integrated Approach to User Account Management

    Science.gov (United States)

    Kesselman, Glenn; Smith, William

    2007-01-01

    IT environments consist of both Windows and other platforms. Providing user account management for this model has become increasingly diffi cult. If Microsoft#s Active Directory could be enhanced to extend a W indows identity for authentication services for Unix, Linux, Java and Macintosh systems, then an integrated approach to user account manag ement could be realized.

  1. Determination of Infrastructure Development in the Integrated Management Planning of Firtina Basin throug Participatary Approach

    Directory of Open Access Journals (Sweden)

    Cenap SANCAR

    2015-12-01

    Full Text Available Fırtına Basin (FB having natural temperate zone forests, rich biodiversity and high endemic variety is located in Caucasus Ecoregion which is among the most important 25 ecoregions on earth. Additionally, forest zones in FB are listed among “100 Forest Hotspots” in Europe by The World Conservation Monitoring Centre (UNEP WCMC. This study identified how and to what level existing land use pattern and related infrastructure, which compose basic inputs of sustainable basin management, influence ecology and biodiversity. Findings also revealed certain socio-economic and environmental effects of recent applications / projects which were not based on a holistic management plan. This study seeks to establish adequate technical infrastructure for the rational use and sustainable management of natural resources (water, soil, forest, etc. in Fırtına Basin and to provide coordination among the institutions. The Integrated Basin Management project also aims at designing a sustainable natural resource management and biodiversity conservation model for the piloting area, Fırtına Basin as well as for other basins. Moreover, IBM (Integrated Basin Management experiences will be opened to debate among scholars in academic and institutional circles who are also concerned with the basins in the same ecological corridor (Eastern Black Sea Mountains or other basins in the wider Caucasus Ecoregion.

  2. Implementing Integrated River Basin Management in China

    Directory of Open Access Journals (Sweden)

    Dorri G. J. te Boekhorst

    2010-06-01

    Full Text Available This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are matched with the advice of the China Council for International Cooperation on Environment and Development task force on integrated river basin management to the national government of China. This article demonstrates that the World Wildlife Fund for Nature uses various strategies of different types to support a transition process towards integrated river basin management. Successful deployment of these strategies for change in environmental policy requires special skills, actions, and attitudes on the part of the policy entrepreneur, especially in China, where the government has a dominant role regarding water management and the position of policy entrepeneurs is delicate.

  3. PENATAAN RUANG LAUT BERDASARKAN INTEGRATED COASTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dina Sunyowati

    2008-10-01

    Full Text Available The planning of coastal spatial arrangement must be put in the valid spatial planning system. Law Number 26 of 2007 on Spatial Planning and it is in fact related with land spatial planning, although that ocean and air spatial management will be arranged in separate law. The legal for coastal zone management is determined by using the principles of integrated coastal management by focusing on area or zone authority system. The integrated of coastal zones management regulations should be followed by the planning of coastal spatial arrange­ment. Therefore, certain synchronization at coastal zones governance is very important issue since by integrating and coordinating other related regulations and therefore conflict of norm can be minimized in the spatial planning coastal zone.

  4. Integrated therapy safety management system

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-01-01

    Aims The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an ‘integrated therapy safety management’ is drafted. This concept could serve as a basis to improve resilience. Methods The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for ‘integrated therapy safety management’. The concept is applied by way of example for the ‘medication process’ to demonstrate its practical implementation. Results The ‘integrated therapy safety management’ is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of ‘bridge managers’. ‘Bridge managers’ anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the ‘bridge managers’ and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. Conclusions The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. PMID:24007448

  5. Permafrost Distribution along the Qinghai-Tibet Engineering Corridor, China Using High-Resolution Statistical Mapping and Modeling Integrated with Remote Sensing and GIS

    Directory of Open Access Journals (Sweden)

    Fujun Niu

    2018-02-01

    Full Text Available Permafrost distribution in the Qinghai-Tibet Engineering Corridor (QTEC is of growing interest due to the increase in infrastructure development in this remote area. Empirical models of mountain permafrost distribution have been established based on field sampled data, as a tool for regional-scale assessments of its distribution. This kind of model approach has never been applied for a large portion of this engineering corridor. In the present study, this methodology is applied to map permafrost distribution throughout the QTEC. After spatial modelling of the mean annual air temperature distribution from MODIS-LST and DEM, using high-resolution satellite image to interpret land surface type, a permafrost probability index was obtained. The evaluation results indicate that the model has an acceptable performance. Conditions highly favorable to permafrost presence (≥70% are predicted for 60.3% of the study area, declaring a discontinuous permafrost distribution in the QTEC. This map is useful for the infrastructure development along the QTEC. In the future, local ground-truth observations will be required to confirm permafrost presence in favorable areas and to monitor permafrost evolution under the influence of climate change.

  6. Integrating spatial support tools into strategic planning-SEA of the GMS North-South Economic Corridor Strategy and Action Plan

    International Nuclear Information System (INIS)

    Ramachandran, Pavit; Linde, Lothar

    2011-01-01

    The GMS countries, supported by the Asian Development Bank, have adopted a holistic, multidimensional approach to strengthen infrastructural linkages and facilitate cross border trade through (i) the establishment of a trans-boundary road connecting two economic nodes across marginalised areas, followed by 2) facilitation of environmentally and socially sound investments in these newly connected areas as a means to develop livelihoods. The North-South Economic Corridor is currently in its second phase of development, with investment opportunities to be laid out in the NSEC Strategy and Action Plan (SAP). It targets the ecologically and culturally sensitive border area between PR China's Yunnan Province, Northern Lao PDR, and Thailand. A trans-boundary, cross-sectoral Strategic Environmental Assessment was conducted to support the respective governments in assessing potential environmental and social impacts, developing alternatives and mitigation options, and feeding the findings back into the SAP writing process. Given the spatial dimension of corridor development-both with regard to opportunities and risks-particular emphasis was put in the application of spatial modelling tools to help geographically locate and quantify impacts as a means to guide interventions and set priorities.

  7. Knowledge and information management for integrated water resource management

    Science.gov (United States)

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  8. Marketing Integration for the Implementation of Territorial and Sectoral Approach to the Management of Electricity Development

    Directory of Open Access Journals (Sweden)

    Ivan A. Unshchikov

    2017-06-01

    Full Text Available This article contains a proposal for a new approach to management of development of electric power in the multi-level governance system. To improve the effectiveness of the multi-level governance is offered by the wide use of marketing. Tools of investment marketing can be used to match demand and supply, using all levels of management. To do this, the subjects at every level of government carried out an identical procedure horizontal integration of sectoral and territorial marketing. Isolated, and then analyzed and evaluated by territorial competitive position and industry competitive position. Then, based on analysis and evaluation of produced competitive position produced directions of development and formed investment proposals. After conducted custom PESTanalysis, which is proposed to use as a tool for analysis and evaluation of investment demand subjects of external control levels and, in fact, is a vertically integrated marketing in the multi-level governance system. With this approach, each actively involved in the mechanism of the subject of management has the ability to efficiently allocate "through the corridors" of investment development, to select appropriate investment proposals. Goal setting, recording and evaluation of the competitive position in the performance of the above procedures can effectively compare and coordinate investment demand with investment proposals in the complex structure of multi-level governance. The use of horizontal and vertical integration of marketing in this system greatly increases the efficiency of management by taking into account the scale and evaluation of internal and external market factors.

  9. Integrated water and waste management

    DEFF Research Database (Denmark)

    Harremoës, P.

    1997-01-01

    The paper discusses concepts and developments within water quantity, water quality, integrated environmental assessment and wastewater treatment. The historical and the global perspectives are used in the discussion of the role of engineers in today's society. Sustainabilty and ethics are taken...... into the analysis. There is a need for re-evaluation of the resource, society and environment scenarios with a view to the totality of the system and with proper analysis of the flow of water and matter through society. Among the tools are input-output analysis and cradle to grave analysis, in combination...... with compilation of identified sets of values with respect to sustainable use of resources and ultimate fate of the environment and quality of life. The role of the engineer is to make available to society as many technical options as possible - and to put these options into the proper perspective in relation...

  10. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  11. Integrated solid waste management in megacities

    Directory of Open Access Journals (Sweden)

    M.A. Abdoli

    2016-05-01

    Full Text Available Rapid urbanization and industrialization, population growth and economic growth in developing countries make management of municipal solid waste more complex comparing with developed countries. Furthermore, the conventional municipal solid waste management approach often is reductionists, not tailored to handle complexity. Therefore, the need to a comprehensive and multi-disciplinary approach regarding the municipal solid waste management problems is increasing. The concept of integrated solid waste management is accepted for this aim all over the world. This paper analyzes the current situation as well as opportunities and challenges regarding municipal solid waste management in Isfahan according to the integrated solid waste management framework in six aspects: environmental, political/legal, institutional, socio-cultural, financial/economic, technical and performance aspects. Based on the results obtained in this analysis, the main suggestions for future integrated solid waste management of Isfahan are as i promoting financial sustainability by taking the solid waste fee and reducing the expenses through the promoting source collection of recyclable materials, ii improving compost quality and also marketing the compost products simultaneously, iii promoting the private sector involvements throughout the municipal solid waste management system.

  12. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  13. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  14. Integrated management in calcareous soils

    International Nuclear Information System (INIS)

    Castilla, Luis A; Salive, A

    2001-01-01

    Rice growing is developed in different kinds of soils, and some of the have high bases saturation, especially calcium and magnesium, as well as medium to high carbonate contents. This causes negative effects in the development and growth of the rice plant. As a consequence, several researching actions have been under-taken, and they are aimed at becoming this problem in economically manageable. Among the strategies we have, some of them are as follows: evaluating rice varieties presenting tolerance to these soils; using inorganic fertilizers looking for a response to elements, sources, dose and application times; evaluating organic fertilizers, mainly the green ones; using amendments, and physical soil management. According to the results, we have the fertilization response with major and minor elements and with the statistical differences at a 0.05% level. A response was found with elements such as zinc, copper, boron, iron, phosphorus and potassium. However, the efficiency of these elements depends on the addition of amendments as sulfur, the use of green fertilizers and farming systems that eliminate the superficial compaction of these soils, besides the use of varieties which are more tolerant to alkalinity, just like Fedearroz-50

  15. Renewed mer model of integral management

    Directory of Open Access Journals (Sweden)

    Janko Belak

    2015-12-01

    Full Text Available Background: The research work on entrepreneurship, enterprise's policy and management, which started in 1992, successfully continued in the following years. Between 1992 and 2011, more than 400 academics and other researchers have participated in research work (MER research program whose main orientation has been the creation of their own model of integral management. Results: In past years, academics (researchers and authors of published papers from Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Byelorussia, Canada, the Czech Republic, Croatia, Estonia, France, Germany, Hungary, Italy, Poland, Romania, Russia, the Slovak Republic, Slovenia, Switzerland, Ukraine, and the US have cooperated in MER programs, coming from more than fifty institutions. Thus, scientific doctrines of different universities influenced the development of the MER model which is based on both horizontal and vertical integration of the enterprises' governance and management processes, instruments and institutions into a consistently operating unit. Conclusions: The presented MER model is based on the multi-layer integration of governance and management with an enterprise and its environment, considering the fundamental desires for the enterprises' existence and, thus, their quantitative as well as qualitative changes. The process, instrumental, and institutional integrity of the governance and management is also the initial condition for the implementation of all other integration factors.

  16. Nitrogen retention in river corridors: European perspective

    Energy Technology Data Exchange (ETDEWEB)

    Haycock, N [Dept. of Agriculture and Water Management, Silsoe College, Cranfield Institute of Technology (United Kingdom); Pinay, G [CERR/CNRS, Toulouse (France); Walker, Charles [SBEG, Inst. of Ecology, Lund Univ. (Sweden)

    1993-01-01

    The problem of nitrogen pollution in European surface- and groundwaters has become a focus of recent European and Scandinavian directives, with legislation calling for a 50% reduction of N losses by the years 1995 and 2000, respectively. This paper provides a conceptual framework upon which management strategies to reduce losses of diffuse nitrogen pollution to surface waters may be based. The control of nitrogen pollution may take place through an increase in the complexity of the landscape, not throughout the catchment area, but rather in specific zones, the river corridor in particular. Within river corridors, riparian areas have been recognized globally for their value as nutrient removal ''buffer systems''. Studies have identified vegetation uptake and microbial denitrification as the primary mechanisms responsible for N removal in these systems. For these processes to function optimally on an annual basis, both vegetation and water regime must be managed. The establishment and management of riparian buffer zones in suitable places within river corridors, will provide a stable and sustainable water-protection function. This will complement future nitrogen input control strategies, needed for both the long-term protection of groundwater and surface waters in Europe as a whole, and for the proposed 50% reduction in nitrogen loading to the Baltic and North Sea coastal waters by the turn of the century. 52 refs, 5 figs

  17. Green corridors and network design

    DEFF Research Database (Denmark)

    Panagakos, George

    2016-01-01

    The purpose of this chapter is to investigate the relation between the Trans-European Transport Network (TEN-T) and the green corridor concept. First, the need is established for a corridor governance structure that enables the close cooperation among the numerous stakeholders from both the public...

  18. Green corridors in freight logistics

    DEFF Research Database (Denmark)

    Panagakos, George

    of the performance of a green corridor in terms of pre-specified Key Performance Indicators (KPIs). The thesis builds on previous own work under the EUfinanced SuperGreen project and applies the new methodology on the GreCOR corridor extending from Oslo to Rotterdam. The scope of the two other objectives relates...... the rationale for a performance monitoring scheme has been established, the thesis critically reviews the SuperGreen methodology which consists of: (i) decomposing the corridor into transport chains, (ii) selecting a sample of typical chains, (iii) assessing these chains through a set of KPIs, and (iv......) aggregating the chain-level KPIs to corridor-level ones using proper weights. Unlike SuperGreen that suggests a study-based approach for constructing the corridor sample, the thesis proposes founding the selection of typical chains on the outcome of specialised transport models. The periodic collection...

  19. Power management techniques for integrated circuit design

    CERN Document Server

    Chen, Ke-Horng

    2016-01-01

    This book begins with the premise that energy demands are directing scientists towards ever-greener methods of power management, so highly integrated power control ICs (integrated chip/circuit) are increasingly in demand for further reducing power consumption. * A timely and comprehensive reference guide for IC designers dealing with the increasingly widespread demand for integrated low power management * Includes new topics such as LED lighting, fast transient response, DVS-tracking and design with advanced technology nodes * Leading author (Chen) is an active and renowned contributor to the power management IC design field, and has extensive industry experience * Accompanying website includes presentation files with book illustrations, lecture notes, simulation circuits, solution manuals, instructors manuals, and program downloads.

  20. Identification of functional corridors with movement characteristics of brown bears on the Kenai Peninsula, Alaska

    Science.gov (United States)

    Graves, T.A.; Farley, S.; Goldstein, M.I.; Servheen, C.

    2007-01-01

    We identified primary habitat and functional corridors across a landscape using Global Positioning System (GPS) collar locations of brown bears (Ursus arctos). After deriving density, speed, and angular deviation of movement, we classified landscape function for a group of animals with a cluster analysis. We described areas with high amounts of sinuous movement as primary habitat patches and areas with high amounts of very directional, fast movement as highly functional bear corridors. The time between bear locations and scale of analysis influenced the number and size of corridors identified. Bear locations should be collected at intervals ???6 h to correctly identify travel corridors. Our corridor identification technique will help managers move beyond the theoretical discussion of corridors and linkage zones to active management of landscape features that will preserve connectivity. ?? 2007 Springer Science+Business Media, Inc.

  1. Effects of vegetation, corridor width and regional land use on early successional birds on powerline corridors.

    Directory of Open Access Journals (Sweden)

    Robert A Askins

    Full Text Available Powerline rights-of-way (ROWs often provide habitat for early successional bird species that have suffered long-term population declines in eastern North America. To determine how the abundance of shrubland birds varies with habitat within ROW corridors and with land use patterns surrounding corridors, we ran Poisson regression models on data from 93 plots on ROWs and compared regression coefficients. We also determined nest success rates on a 1-km stretch of ROW. Seven species of shrubland birds were common in powerline corridors. However, the nest success rates for prairie warbler (Dendroica discolor and field sparrow (Spizella pusilla were <21%, which is too low to compensate for estimated annual mortality. Some shrubland bird species were more abundant on narrower ROWs or at sites with lower vegetation or particular types of vegetation, indicating that vegetation management could be refined to favor species of high conservation priority. Also, several species were more abundant in ROWs traversing unfragmented forest than those near residential areas or farmland, indicating that corridors in heavily forested regions may provide better habitat for these species. In the area where we monitored nests, brood parasitism by brown-headed cowbirds (Molothrus ater occurred more frequently close to a residential area. Although ROWs support dense populations of shrubland birds, those in more heavily developed landscapes may constitute sink habitat. ROWs in extensive forests may contribute more to sustaining populations of early successional birds, and thus may be the best targets for habitat management.

  2. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Hopkins, J.R.

    1998-01-01

    An integrated approach to plant life management has been developed for CANDU reactors. Strategies, methods, and procedures have been developed for assessment of critical systems structures and components and for implementing a reliability centred maintenance program. A Technology Watch program is being implemented to eliminate 'surprises'. Specific work has been identified for 1998. AECL is working on the integrated program with CANDU owners and seeks participation from other CANDU owners

  3. Integration of Standardized Management Systems: A Dilemma?

    Directory of Open Access Journals (Sweden)

    Manuel Ferreira Rebelo

    2015-06-01

    Full Text Available The growing proliferation of management systems standards (MSSs, and their individualized implementation, is a real problem faced by organizations. On the other hand, MSSs are aimed at improving efficiency and effectiveness of organizational responses in order to satisfy the requirements, needs and expectations of the stakeholders. Each organization has its own identity and this is an issue that cannot be neglected; hence, two possible approaches can be attended. First, continue with the implementation of individualized management systems (MSs; or, integrate the several MSSs versus related MSs into an integrated management system (IMS. Therefore, in this context, organizations are faced with a dilemma, as a result of the increasing proliferation and diversity of MSSs. This paper takes into account the knowledge gained through a case study conducted in the context of a Portuguese company and unveils some of the advantages and disadvantages of integration. A methodology is also proposed and presented to support organizations in developing and structuring the integration process of their individualized MSs, and consequently minimize problems that are generators of inefficiencies, value destruction and loss of competitiveness. The obtained results provide relevant information that can support Top Management decision in solving that dilemma and consequently promote a successful integration, including a better control of business risks associated to MSSs requirements and enhancing sustainable performance, considering the context in which organizations operate.

  4. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  5. Integrated economic management. Principal aspects and future

    International Nuclear Information System (INIS)

    2004-01-01

    Now that five years have passed (1999-2003) since the Owner Companies decided to merge the Asco and Vandellos-II nuclear power plants, we believe that, for Integrated Management through a single AIE, it is timely and advisable to describe the key issues of the process implemented to optimize economic results, always in accordance with the Policies of Nuclear Safety, Quality and Environment, Prevention, Human Factors and Availability, and we emphasize the following as essential elements: The Corporate Model; strategic/Operating Plans; integrated Economic Management Model SIE; Rationalization of the organizational structure, Continuous Training; Analysis of Processes and Procedures. (Author)

  6. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  7. Integrated Management System - Scope, Possibilities And Methodology

    Science.gov (United States)

    Čekanová, Katarína

    2015-06-01

    Organizations are becoming more aware of the importance of integrated management systems (IMS). Interest in this subject indicates that IMS are seen as "management systems of the future". Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  8. Toward integrated design of waste management technologies

    International Nuclear Information System (INIS)

    Carnes, S.A.; Wolfe, A.K.

    1994-01-01

    Implementation of waste management technologies has been hindered by the intervention of diverse interests. Relying on a perceived history of inadequate and improper management, operations, and technological design, critics have stymied the implementation of scientifically and governmentally approved technologies and facilities, leading to a critical shortage of hazardous, mixed, and radioactive waste management capacity. The research and development (R ampersand D) required to identify technologies that are simultaneously (1) scientifically valid, (2) economically sound, and (3) publicly acceptable must necessarily address, in an integrated and interdisciplinary manner, these three criteria and how best to achieve the integration of stakeholders early in the technology implementation process (i.e., R ampersand D, demonstration, and commercialization). The goal of this paper is to initiate an identification of factors likely to render radioactive and hazardous waste management technologies publicly acceptable and to provide guidance on how technological R ampersand D might be revised to enhance the acceptability of alternative waste management technologies. Principal among these factors are the equitable distribution of costs, risks, and benefits of waste management policies and technologies, the equitable distribution of authority for making waste management policy and selecting technologies for implementation, and the equitable distribution of responsibility for resolving waste management problems. Stakeholder participation in assessing the likely distribution of these factors and mitigative mechanisms to enhance their equitable distribution, together with stakeholder participation in policy and technology R ampersand D, as informed by stakeholder assessments, should enhance the identification of acceptable policies and technologies

  9. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  10. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  11. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  12. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  13. Plant life management. Progress for structural integrity

    International Nuclear Information System (INIS)

    Solin, J.

    2003-03-01

    A joint project cluster of industry, VTT and other R and D suppliers is dealing with managing of lifetime of critical structures and components in energy and process industry. The research topics include systematic component lifetime management, data management, integrity and lifetime of pressure bearing components, non-destructive inspection, interactions of coolant and materials, environmentally assisted cracking and ageing of reactor internals. This Symposium is a compilation of selected papers describing an intermediate status of the projects after three years of research and development. (orig.)

  14. Transportation of Dangerous Goods in Green Transport Corridors - Conclusions from Baltic Sea Region

    Directory of Open Access Journals (Sweden)

    Schröder Meike

    2016-12-01

    Full Text Available The Green Corridor concept represents a cornerstone in the development and implementation of integrated and sustainable transport solutions based on trans-nationality, multi-modality and a high involvement of public and private stakeholders, including the political level. Despite the fact that the Green Transport Corridor (GTC concept is founded on the three dimensions of sustainability with a strong emphasis on environmental aspects, the corridor hubs as well as the whole transport corridors have to find ways to handle and transport dangerous goods by keeping the high sustainability standards.

  15. Integrated Pest Management Research Symposium: The Proceedings

    Science.gov (United States)

    Susan J. Branham; Robert C. Thatcher; [Editors

    1985-01-01

    Thirty-seven papers are presented that summarize the findings from research and development work conducted as a part of the Integrated Pest Management RD&A Program for Bark Beetles of Southern Pines during the 5-year period 1980-85. Presentations cover the areas of sampling and impact assessment, bark beetle biology and ecology, host susceptibility, host/pest...

  16. Integrated Management of Structural Pests in Schools.

    Science.gov (United States)

    Illinois State Dept. of Public Health, Springfield.

    The state of Illinois is encouraging schools to better inspect and evaluate the causes of their pest infestation problems through use of the Integrated Pest Management (IPM) guidelines developed by the Illinois Department of Public Health. This guide reviews the philosophy and organization of an IPM program for structural pests in schools,…

  17. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  18. Implementing Integrated River Basin Management in China

    NARCIS (Netherlands)

    Boekhorst, D.G.J. te; Smits, A.J.M.; Yu, X.; Lifeng, L.; Lei, G.; Zhang, C.

    2010-01-01

    This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are

  19. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    Background: Save the Children Tanzania has been supporting several projects in Lindi Region including implementation of health facility based Integrated Management of Childhood Illness (IMCI) services in Kilwa, Ruangwa and Lindi rural districts. The objective of this study was to assess the IMCI services in a sample of ...

  20. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  1. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  2. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  3. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  4. Ontology modeling in physical asset integrity management

    CERN Document Server

    Yacout, Soumaya

    2015-01-01

    This book presents cutting-edge applications of, and up-to-date research on, ontology engineering techniques in the physical asset integrity domain. Though a survey of state-of-the-art theory and methods on ontology engineering, the authors emphasize essential topics including data integration modeling, knowledge representation, and semantic interpretation. The book also reflects novel topics dealing with the advanced problems of physical asset integrity applications such as heterogeneity, data inconsistency, and interoperability existing in design and utilization. With a distinctive focus on applications relevant in heavy industry, Ontology Modeling in Physical Asset Integrity Management is ideal for practicing industrial and mechanical engineers working in the field, as well as researchers and graduate concerned with ontology engineering in physical systems life cycles. This book also: Introduces practicing engineers, research scientists, and graduate students to ontology engineering as a modeling techniqu...

  5. Integrated Simulation Of Supply Chain Management

    Directory of Open Access Journals (Sweden)

    N.Manikandan

    2013-06-01

    Full Text Available Nowadays, manufacturers face the challenge of reducing manufacturing cycle time, delivery lead time and inventory reduction. Every organization has its own objectives and its own way of decision making processes. Because of the conflictions among the objectives of each organization and non-integrated decision making processes, there has been a need for a new mechanism, which help to resolve those conflictions and to integrate processes. In the early 1990s, management is a process of integrating and utilizing suppliers, manufacturers, warehouses and retailers, so that goods are produced and delivered at the right quantities and at the right time while minimizing costs as well as satisfying customer requirements. Managing the entire supply chain becomes a key factor for the successful business. Organizations now realize that non-integrated manufacturing processes, nonintegrated distribution processes and poor relationships with suppliers and customers are in adequate for their success. The supply chain areas are affected by the organization’s plan. The organization plan’s impact on the supply chain areas cannot be predicted before its execution. Simulation paves way to evaluate the performance of plans before the execution of the plan. This paper describes the effort of developing a simulation model for the supply chain management in an industry. This article discusses the requirement of supply chain simulation modeling.

  6. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  7. Open Source GIS based integrated watershed management

    Science.gov (United States)

    Byrne, J. M.; Lindsay, J.; Berg, A. A.

    2013-12-01

    Optimal land and water management to address future and current resource stresses and allocation challenges requires the development of state-of-the-art geomatics and hydrological modelling tools. Future hydrological modelling tools should be of high resolution, process based with real-time capability to assess changing resource issues critical to short, medium and long-term enviromental management. The objective here is to merge two renowned, well published resource modeling programs to create an source toolbox for integrated land and water management applications. This work will facilitate a much increased efficiency in land and water resource security, management and planning. Following an 'open-source' philosophy, the tools will be computer platform independent with source code freely available, maximizing knowledge transfer and the global value of the proposed research. The envisioned set of water resource management tools will be housed within 'Whitebox Geospatial Analysis Tools'. Whitebox, is an open-source geographical information system (GIS) developed by Dr. John Lindsay at the University of Guelph. The emphasis of the Whitebox project has been to develop a user-friendly interface for advanced spatial analysis in environmental applications. The plugin architecture of the software is ideal for the tight-integration of spatially distributed models and spatial analysis algorithms such as those contained within the GENESYS suite. Open-source development extends knowledge and technology transfer to a broad range of end-users and builds Canadian capability to address complex resource management problems with better tools and expertise for managers in Canada and around the world. GENESYS (Generate Earth Systems Science input) is an innovative, efficient, high-resolution hydro- and agro-meteorological model for complex terrain watersheds developed under the direction of Dr. James Byrne. GENESYS is an outstanding research and applications tool to address

  8. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The Japanese, through a combination of public policy, private market conditions, a geographic necessity, practice integrated municipal solid waste (MSW) management. The approach of MSW management in Japan is as follows: The basic concept of refuse treatment consists of recycling discharged refuse into usable resources, reusing such resources as much as possible, and then treating or disposing of the usable portion into a sanitary condition. Considering the difficulty of procuring land or seaside areas for such purpose as a refuse disposal site, it will be necessary to minimize the volume of refuse collected for treatment or disposal.

  9. Increasing efficiency through integrated energy data management

    International Nuclear Information System (INIS)

    Brack, M.

    2002-01-01

    This article discusses how improved management of energy data can bring about the increase in efficiency that is necessary for an electricity enterprise operating in a liberalised electricity market. The relevant technical and business processes involved for a typical power distribution utility are described. The present situation is reviewed and the various physical, data-logistics and commercial 'domains' involved are examined. Possible solutions for energy data logistics and integrated data management are discussed from the points of view of the operating utility, the power supplier and those responsible for balancing out supply and demand

  10. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24

    This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to

  11. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  12. Asset management -- Integrated software optimizes production performance

    International Nuclear Information System (INIS)

    Polczer, S.

    1998-01-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle's universal data server software development tools with ATS's upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting

  13. Asset management -- Integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-10-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server software development tools with ATS`s upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting.

  14. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  15. Making Technology Ready: Integrated Systems Health Management

    Science.gov (United States)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  16. Investigation of Integrated Vehicle Health Management Approaches

    Science.gov (United States)

    Paris, Deidre

    2005-01-01

    This report is to present the work that was performed during the summer in the Advance Computing Application office. The NFFP (NASA Faculty Fellow Program) had ten summer faculty members working on IVHM (Integrated Vehicle Health Management) technologies. The objective of this project was two-fold: 1) to become familiar with IVHM concepts and key demonstrated IVHM technologies; and 2) to integrate the research that has been performed by IVHM faculty members into the MASTLAB (Marshall Avionic Software Test Lab). IVHM is a NASA-wide effort to coordinate, integrate and apply advanced software, sensors and design technologies to increase the level of intelligence, autonomy, and health state of future vehicles. IVHM is an important concept because it is consistent with the current plan for NASA to go to the moon, mars, and beyond. In order for NASA to become more involved in deep exploration, avionic systems will need to be highly adaptable and autonomous.

  17. Management of area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    Dyck, V.A.; Vreysen, M.J.B.; Reyes Flores, J.; Regidor Fernandez, E.E.; Teruya, T.; Barnes, B.; Gomez Riera, P.; Lindquist, D.; Loosjes, M.

    2005-01-01

    Effective management of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) is key to success. Programme planning includes collection of baseline data and a feasibility assessment. The optimal management structure is where the programme can be implemented effectively and flexibly, independent of government politics, bureaucracy, and even corruption that impede timely goal achievement. Ideally, programmes include both public and private management, and require strong and steady financial support. Governments and donors are the most common sources of funds, but a mixture of public, community, and private funds is now the trend. Interrupted cash flow severely restrains programme performance. Physical support of programme operations must be reliable, and led by a maintenance professional. It is essential to have full-time, well-paid, and motivated staff led by a programme manger with technical and management experience. Programme failure is usually due to poor management and inadequate public support, and not to poor technology. (author)

  18. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  19. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  20. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  1. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  2. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    1 janv. 2012 ... Integrated Natural Resource Management in the Highlands of Eastern Africa: ... goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  3. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2012-01-01

    Jan 1, 2012 ... Book cover Integrated Natural Resource Management in the ... with the common goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  4. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  5. Integrated nutrients management for 'desi' cotton

    International Nuclear Information System (INIS)

    Qazi, M.A.; Akram, M.; Ahmad, N.; Khattak, M.A.

    2007-01-01

    Intensive cropping with no return of crop residues and other organic inputs result in the loss of soil organic matter (SOM) and nutrient supply in (Desi) cotton-wheat cropping system in Pakistan. For appraisal of problem and finding solution to sustainability, we evaluated six treatments comprised of two fertilizer doses and three management techniques over a period of three years (2003-05) monitoring their effects on seed cotton yield and soil fertility. The techniques included chemical fertilizers, municipal solid waste manure (MSWM) integrated with chemical fertilizers in 1:4 ratios with, and without pesticides. The results revealed that cotton yields. Were enhanced by 19% due to site-specific fertilizer dose over conventional dose. Ignoring weeds control by means of herbicided application resulted in 5% decrease of seed cotton yield in IPNM technique positive effect of MSWM integration was noted on soil test phosphorus and SOM. Site-specific fertilizer application and integrated plant nutrient management by MSWM proved their suitability as the techniques not only improve soil quality in terms of sustained levels of organic matter and phosphorus but also provide a safe way of waste disposal. (author)

  6. Developing transit-oriented corridors: insights from Tokyo

    NARCIS (Netherlands)

    Chorus, P.; Bertolini, L.

    2016-01-01

    Various studies have pointed out that a successful integration of public transport and land use requires plans covering the entire metropolitan region that are consistent over a long period of time. The proposition that is explored in this article is that railway corridors can offer an effective

  7. Towards integrated catchment management, Whaingaroa, New Zealand.

    Science.gov (United States)

    van Roon, M; Knight, S

    2001-01-01

    The paper examines progress towards integrated catchment management and sustainable agriculture at Whaingaroa (Raglan), New Zealand. Application of the Canadian "Atlantic Coastal Action Program" model (ACAP) has been only partially successful within New Zealand's bicultural setting. Even before the introduction of the ACAP process there existed strong motivation and leadership by various sectors of the community. A merging of resource management planning and implementation processes of the larger community and that of the Maori community has not occurred. Research carried out by Crown Research Institutes has clearly shown the actions required to make pastoral farming more sustainable. There are difficulties in the transference to, and uptake of, these techniques by farmers. An examination of the socio-economic context is required. There has been a requirement on local government bodies to tighten their focus as part of recent reform. This has occurred concurrently with a widening of vision towards integrated and sustainable forms of management. This (as well as a clear belief in empowerment of local communities) has lead to Council reliance on voluntary labour. There is a need to account for the dynamic interaction between social and political history and the geological and biophysical history of the area. As part of a re-examination of sustainable development, New Zealand needs to reconcile the earning of the bulk of its foreign income from primary production, with the accelerating ecological deficit that it creates. A sustainability strategy is required linking consumer demand, property rights and responsibilities.

  8. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  9. Integrated Global Nuclear Materials Management Preliminary Concepts

    International Nuclear Information System (INIS)

    Jones, E; Dreicer, M.

    2006-01-01

    The world is at a turning point, moving away from the Cold War nuclear legacy towards a future global nuclear enterprise; and this presents a transformational challenge for nuclear materials management. Achieving safety and security during this transition is complicated by the diversified spectrum of threat 'players' that has greatly impacted nonproliferation, counterterrorism, and homeland security requirements. Rogue states and non-state actors no longer need self-contained national nuclear expertise, materials, and equipment due to availability from various sources in the nuclear market, thereby reducing the time, effort and cost for acquiring a nuclear weapon (i.e., manifestations of latency). The terrorist threat has changed the nature of military and national security requirements to protect these materials. An Integrated Global Nuclear Materials Management (IGNMM) approach would address the existing legacy nuclear materials and the evolution towards a nuclear energy future, while strengthening a regime to prevent nuclear weapon proliferation. In this paper, some preliminary concepts and studies of IGNMM will be presented. A systematic analysis of nuclear materials, activities, and controls can lead to a tractable, integrated global nuclear materials management architecture that can help remediate the past and manage the future. A systems approach is best suited to achieve multi-dimensional and interdependent solutions, including comprehensive, end-to-end capabilities; coordinated diverse elements for enhanced functionality with economy; and translation of goals/objectives or standards into locally optimized solutions. A risk-informed basis is excellent for evaluating system alternatives and performances, and it is especially appropriate for the security arena. Risk management strategies--such as defense-in-depth, diversity, and control quality--help to weave together various technologies and practices into a strong and robust security fabric. Effective

  10. Water management as a key component of integrated weed management

    Directory of Open Access Journals (Sweden)

    Antonio Berti

    2010-09-01

    Full Text Available Water management within the cropping system is a key factor for an integrated weed management. Soil moisture affects seed persistence and seed dormancy, thus influencing their germination, the establishment of seedlings as well as the competition at adult stage and the number, vitality and dormancy of the new seeds produced by the weeds. The interactions among water availability and competition are very complex and still not fully understood. A research effort in this sector should the be very relevant for the development of new approaches of weed management, such as “Ecological weed management”, aiming to reduce weed density and competitiveness and, in the medium term, to prevent undesired modifications of the weed flora.

  11. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  12. Rocket Testing and Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John

    2005-01-01

    Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

  13. Strategic Environmental Assessment: Integrated environmental management

    CSIR Research Space (South Africa)

    Department of Environmental Affairs and Tourism

    2004-01-01

    Full Text Available stream_source_info Department of Environmental Affairs and Tourism_2004.pdf.txt stream_content_type text/plain stream_size 70155 Content-Encoding ISO-8859-1 stream_name Department of Environmental Affairs and Tourism_2004.pdf... and Tourism Other topics in the series of overview information documents on the concepts of, and approaches to, integrated environmental management are listed below. Further titles in this series are being prepared and will be made available periodically...

  14. FEMA's Integrated Emergency Management Information System (IEMIS)

    International Nuclear Information System (INIS)

    Jaske, R.T.; Meitzler, W.

    1987-01-01

    FEMA is implementing a computerized system for use in optimizing planning, and for supporting exercises of these plans. Called the Integrated Emergency Management Information System (IEMIS), it consists of a base geographic information system upon which analytical models are superimposed in order to load data and report results analytically. At present, it supports FEMA's work in offsite preparedness around nuclear power stations, but is being developed to deal with a full range of natural and technological accident hazards for which emergency evacuation or population movement is required

  15. Integrate offsites management with information systems

    Energy Technology Data Exchange (ETDEWEB)

    Valleur, M. (TECHNIP, Paris (France))

    1993-11-01

    Computerized offsites management systems in oil refineries offer a unique opportunity to integrate advanced technology into a coherent refinery information system that contributes to benefits-driven optimal operations: from long-term, multirefinery linear programming (LP) models to sequential control of transfer lineups in the tank farm. There are strong incentives to automate and optimize the offsites operations, and benefits can be quantified to justify properly sized projects. The paper discusses the following: business opportunities, oil movement and advanced technology, project scoping and sizing, review of functional requirements, transfer automation, blending optimal control, on-line analyzers, oil movement and scheduling, organizational issues, and investment and benefits analysis.

  16. Integrating Flow, Form, and Function for Improved Environmental Water Management

    Science.gov (United States)

    Albin Lane, Belize Arela

    Rivers are complex, dynamic natural systems. The performance of river ecosystem functions, such as habitat availability and sediment transport, depends on the interplay of hydrologic dynamics (flow) and geomorphic settings (form). However, most river restoration studies evaluate the role of either flow or form without regard for their dynamic interactions. Despite substantial recent interest in quantifying environmental water requirements to support integrated water management efforts, the absence of quantitative, transferable relationships between river flow, form, and ecosystem functions remains a major limitation. This research proposes a novel, process-driven methodology for evaluating river flow-form-function linkages in support of basin-scale environmental water management. This methodology utilizes publically available geospatial and time-series data and targeted field data collection to improve basic understanding of river systems with limited data and resource requirements. First, a hydrologic classification system is developed to characterize natural hydrologic variability across a highly altered, physio-climatically diverse landscape. Next, a statistical analysis is used to characterize reach-scale geomorphic variability and to investigate the utility of topographic variability attributes (TVAs, subreach-scale undulations in channel width and depth), alongside traditional reach-averaged attributes, for distinguishing dominant geomorphic forms and processes across a hydroscape. Finally, the interacting roles of flow (hydrologic regime, water year type, and hydrologic impairment) and form (channel morphology) are quantitatively evaluated with respect to ecosystem functions related to hydrogeomorphic processes, aquatic habitat, and riparian habitat. Synthetic river corridor generation is used to evaluate and isolate the role of distinct geomorphic attributes without the need for intensive topographic surveying. This three-part methodology was successfully

  17. Integrated solid waste management of Seattle, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Seattle, Washington, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  18. Integrated solid waste management of Minneapolis, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Minneapolis, Minnesota (Hennepin County) integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM system.

  19. Integrated solid waste management of Sevierville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Sevierville, Tennessee integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  20. Partnership - the heart of integrated outage management

    International Nuclear Information System (INIS)

    Robinson, F.T.

    1995-01-01

    Changes in the power generating industry continue apace. The effects of privatisation are widely visible: nowhere more so than in the growing national and international competition facing the generators around the world. A successful, long-term marriage between generator and contractor on power station outage management offers significant scope for cost reduction, shortening annual plant downtime and generating more megawatts, all within a safety environment of continuous improvement. Working in close partnership, Nuclear Electric and Rolls-Royce Nuclear Engineering Services have remodelled the whole contractor/client strategy. The new discipline, known as integrated outage management and partnering, is already producing shorter outage periods at Bradwell, a Magnox Station in Essex. (author)

  1. Comprehensive highway corridor planning with sustainability indicators.

    Science.gov (United States)

    2011-10-01

    "The Maryland State Highway Administration (SHA) has initiated major planning efforts to improve transportation : efficiency, safety, and sustainability on critical highway corridors through its Comprehensive Highway Corridor : (CHC) program. This pr...

  2. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  3. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Cohen, A.S. [CSI Resource Systems, Boston, MA (United States)

    1993-12-31

    The Japanese, through a combination of public policy, private market conditions, and geographic necessity, practice integrated municipal solid waste management as defined by the US Environmental Protection Agency. The Japanese have not defined a specific hierarchical preference for alternative waste management practices, i.e., waste reduction, reuse and recycling, combustion, composting, and landfill disposal. However, in marked contrast to the US approach, the Japanese system relies heavily on waste combustion, with and without energy recovery. {open_quotes}Discards{close_quotes}, as the term is used in this paper, refers to all materials considered used and spent by residential and commercial generators. That which is discarded (whether recyclable or nonrecyclable) by a municipality is referred to as MSW. This paper provides an overview of MSW management practices and private-sector recycling in Japan. Estimates of the total generation of residential and commercial discards and their disposition are also presented. Such an overview of Japanese practices can be used to assess the potential effectiveness of US integrated solid waste management programs. Of the estimated 61.3 to 72.1 million tons of residential and commercial discards generated in Japan during its 1989 fiscal year (April 1, 1989, through March 31, 1990), an estimated 55 to 64 percent was incinerated; 15 to 28 percent was recycled (only 2 to 3 percent through municipal recycling activities); less than 0.1 percent was composted or used as animal feed; and 17 to 20 percent was landfilled. Including ash disposal, 26 to 30 percent, by weight, of the gross discards were landfilled.

  4. Integrated water resources management using engineering measures

    Science.gov (United States)

    Huang, Y.

    2015-04-01

    The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  5. Integrated water resources management using engineering measures

    Directory of Open Access Journals (Sweden)

    Y. Huang

    2015-04-01

    Full Text Available The management process of Integrated Water Resources Management (IWRM consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation, are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  6. Managing Uncertainty for an Integrated Fishery

    Directory of Open Access Journals (Sweden)

    MB Hasan

    2012-06-01

    Full Text Available This paper investigates ways to deal with the uncertainties in fishing trawler scheduling and production planning in a quota-based integrated commercial fishery. A commercial fishery faces uncertainty mainly from variation in catch rate, which may be due to weather, and other environmental factors. The firm tries to manage this uncertainty through planning co-ordination of fishing trawler scheduling, catch quota, processing and labour allocation, and inventory control. Scheduling must necessarily be done over some finite planning horizon, and the trawler schedule itself introduces man-made variability, which in turn induces inventory in the processing plant. This induced inventory must be managed, complicated by the inability to plan easily beyond the current planning horizon. We develop a surprisingly simple innovation in inventory, which we have not seen in other papers on production management, which of requiring beginning inventory to equal ending inventory. This tool gives management a way to calculate a profit-maximizing safety stock that counter-acts the man-made variability due to the trawler scheduling. We found that the variability of catch rate had virtually no effects on the profitability with inventory. We report numerical results for several planning horizon models, based on data for a major New Zealand fishery.

  7. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  8. Ecological quality assessment of rivers and integrated catchment management in England and Wales

    Directory of Open Access Journals (Sweden)

    Paul LOGAN

    2001-09-01

    Full Text Available This paper deals with the ecological assessment of river quality and its relationship to integrated catchment management. The concept of catchment or river basin management has been a basic management tool in England and Wales since 1990; it is now being enshrined in the Water Framework Directive. Historically the statutory and operational drivers in the UK have lead to the development of distinctly different approaches to the management of water quality, water resources (quantity and physical river structure. More recently a proactive approach to the sustainable use of water promulgated in the Local Environment Agency Plans has also dealt with the three management aspects in some isolation although greater effort has been made to present the issues in an integrated manner. The Water Framework Directive calls for further integration in river basin plans and associated programmes of measures. In the paper the three approaches are described and considered in light of the requirements of the Water Framework Directive. Water Quality classification and objective setting has been based on information from the survey of benthic macro-invertebrates. The Biological Monitoring Working Party Score and the predictive software River Invertebrate Prediction and Classification System (RIVPACS have been used to set site-specific targets for management purposes. RIVPACS includes a reference database of minimally impacted sites for comparison with the observed data. This approach is in line with the requirements of the directive. Physical river structure work has been based on monitoring of in-river and river corridor characteristics. The River Habitat System (RHS has also developed a reference database but is less well developed in terms of its predictive ability. The use of ecological information in Water Resource management has taken a different approach based on the concept of differential ecological sensitivity to the hydrological regime within the river. In

  9. Dynamique institutionnelle des transferts de gestion dans le corridor ...

    African Journals Online (AJOL)

    Ten years after their creation, the operation of the community-based natural resource management policy named 'transfert de gestion' – the 1996 GELOSE law (applied to any kind of natural resources), and the 2001 GCF decree (only applied to forests) - remains little understood. The forest corridor linking Ranomafana and ...

  10. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  11. Climate change and integrated water resources management

    International Nuclear Information System (INIS)

    Bhuiyan, Nurul Amin

    2007-01-01

    Full text: Full text: In the Bangladesh Poverty Reduction Strategy (PRSP), Millennium Development Goals and other donor driven initiatives, two vital areas linked with poverty and ecosystem survival seem to be either missing or are being neglected: (a) transboundary water use and (b) coastal area poverty and critical ecosystems vulnerable due to climate change. Since the World Summit on Sustainable Development (WSSD) goals and PRSP are integrated, it is necessary that the countrys WSSD goals and PRSP should also be in harmony. All should give the recognition of Ganges Brahmaputra and Meghna as international basins and the approach should be taken for regional sustainable and integrated water resource management involving all co-riparian countries. The principle of low flow in the international rivers during all seasons should be ensured. All stakeholders should have a say and work towards regional cooperation in the water sector as a top priority. The energy sector should be integrated with water. The Indian River Linking project involving international rivers should be seriously discussed at all levels including the parliament so that voice of Bangladesh is concerted and information shared by all concerned. One of the most critical challenges Bangladesh faces is the management of water resources during periods of water excesses and acute scarcity. It is particularly difficult when only 7% of the catchments areas of the very international rivers, the Ganges, the Brahmaputra and the Meghna are in Bangladesh while 97% is outside Bangladesh where unfortunately, Bangladesh has no control on upstream diversion and water use. The UN Conference on Environment and Development in its Agenda 21 emphasizes the importance of Integrated Water Resource Management (IWRM). The core point of IWRM is that is development of all aspects of entire basin in a basin wide approach, that all relevant agencies of the government and water users must be involved in the planning process and

  12. Integrated Space Asset Management Database and Modeling

    Science.gov (United States)

    MacLeod, Todd; Gagliano, Larry; Percy, Thomas; Mason, Shane

    2015-01-01

    Effective Space Asset Management is one key to addressing the ever-growing issue of space congestion. It is imperative that agencies around the world have access to data regarding the numerous active assets and pieces of space junk currently tracked in orbit around the Earth. At the center of this issues is the effective management of data of many types related to orbiting objects. As the population of tracked objects grows, so too should the data management structure used to catalog technical specifications, orbital information, and metadata related to those populations. Marshall Space Flight Center's Space Asset Management Database (SAM-D) was implemented in order to effectively catalog a broad set of data related to known objects in space by ingesting information from a variety of database and processing that data into useful technical information. Using the universal NORAD number as a unique identifier, the SAM-D processes two-line element data into orbital characteristics and cross-references this technical data with metadata related to functional status, country of ownership, and application category. The SAM-D began as an Excel spreadsheet and was later upgraded to an Access database. While SAM-D performs its task very well, it is limited by its current platform and is not available outside of the local user base. Further, while modeling and simulation can be powerful tools to exploit the information contained in SAM-D, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. This paper provides a summary of SAM-D development efforts to date and outlines a proposed data management infrastructure that extends SAM-D to support the larger data sets to be generated. A service-oriented architecture model using an information sharing platform named SIMON will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for

  13. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  14. Integrated Work Management: FOD/RLM, Course 31882

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300, Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.

  15. Managing racial integration in South African public schools: In ...

    African Journals Online (AJOL)

    The paper explores what racial integration is. Furthermore, it scrutinises how racial integration is currently managed in South African Public schools. The main argument of the paper defends a deliberative conception of managing racial integration in South African public schools. In light of this, there is some form of hope to ...

  16. Integrated vector management: the Zambian experience.

    Science.gov (United States)

    Chanda, Emmanuel; Masaninga, Fred; Coleman, Michael; Sikaala, Chadwick; Katebe, Cecilia; Macdonald, Michael; Baboo, Kumar S; Govere, John; Manga, Lucien

    2008-08-27

    The Zambian Malaria Control Programme with the Roll Back Malaria (RBM) partners have developed the current National Malaria Strategic Plan (NMSP 2006-2011) which focuses on prevention based on the Integrated Vector Management (IVM) strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO) steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  17. Integrated System Health Management (ISHM) and Autonomy

    Science.gov (United States)

    Figueroa, Fernando; Walker, Mark G.

    2018-01-01

    Systems capabilities on ISHM (Integrated System Health Management) and autonomy have traditionally been addressed separately. This means that ISHM functions, such as anomaly detection, diagnostics, prognostics, and comprehensive system awareness have not been considered traditionally in the context of autonomy functions such as planning, scheduling, and mission execution. One key reason is that although they address systems capabilities, both ISHM and autonomy have traditionally individually been approached as independent strategies and models for analysis. Additionally, to some degree, a unified paradigm for ISHM and autonomy has been difficult to implement due to limitations of hardware and software. This paper explores a unified treatment of ISHM and autonomy in the context of distributed hierarchical autonomous operations.

  18. Integrated pest management of "Golden Delicious" apples.

    Science.gov (United States)

    Simončič, A; Stopar, M; Velikonja Bolta, Š; Bavčar, D; Leskovšek, R; Baša Česnik, H

    2015-01-01

    Monitoring of plant protection product (PPP) residues in "Golden Delicious" apples was performed in 2011-2013, where 216 active substances were analysed with three analytical methods. Integrated pest management (IPM) production and improved IPM production were compared. Results were in favour of improved IPM production. Some active compounds determined in IPM production (boscalid, pyraclostrobin, thiacloprid and thiametoxam) were not found in improved IPM production. Besides that, in 2011 and 2012, captan residues were lower in improved IPM production. Risk assessment was also performed. Chronic exposure of consumers was low in general, but showed no major differences for IPM and improved IPM production for active substances determined in both types of production. Analytical results were compared with the European Union report of 2010 where 1.3% of apple samples exceeded maximum residue levels (MRLs), while MRL exceedances were not observed in this survey.

  19. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  20. Integrated solid waste management of Scottsdale, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the city of Scottsdale, Arizona, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. The document reports actual data from records kept by participants. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may per-form manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption, for a 1-year period, of an operating IMSWM system. The report is organized into two main parts. The first part is the executive summary and case study portion of the report. The executive summary provides a basic description of the study area and selected economic and energy information. Within the case study are detailed descriptions of each component operating during the study period; the quantities of solid waste collected, processed, and marketed within the study boundaries; the cost of MSW in Scottsdale; an energy usage analysis; a review of federal, state, and local environmental requirement compliance; a reference section; and a glossary of terms. The second part of the report focuses on a more detailed discourse on the above topics. In addition, the methodology used to determine the economic costs and energy consumption of the system components is found in the second portion of this report. The methodology created for this project will be helpful for those professionals who wish to break out the costs of their own integrated systems.

  1. Energy efficiency through integrated environmental management.

    Science.gov (United States)

    Benromdhane, Souad Ahmed

    2015-05-01

    Integrated environmental management became an economic necessity after industrial development proved to be unsustainable without consideration of environmental direct and indirect impacts. Energy dependency and air pollution along with climate change grew into major challenges facing developed and developing countries alike. Thus, a new global market structure emerged and changed the way we do trade. The search intensified for alternatives to petroleum. However, scientists, policy makers, and environmental activists agreed to focus on strategic conservation and optimization of energy use. Environmental concerns will remain partially unaddressed with the current pace of consumption because greenhouse gas emissions will continue to rise with economic growth. This paper discusses energy efficiency, steady integration of alternative sources, and increased use of best available technologies. Energy criteria developed for environmental labeling certification are presented. Our intention is to encourage manufacturers and service providers to supply consumers with less polluting and energy-consuming goods and services, inform consumers of the environmental and energy impacts, and thereby instill sustainable and responsible consumption. As several programs were initiated in developed countries, environmental labeling requirements created barriers to many exports manufactured in developing countries, affecting current world trade and putting more pressure on countries to meet those requirements. Defining an institutional and legal framework of environmental labeling is a key challenge in implementing such programs for critical economic sectors like tourism, textiles, and food production where energy needs are the most important aspect to control. A case study of Tunisia and its experience with eco-labeling is presented.

  2. Integrated remotely sensed datasets for disaster management

    Science.gov (United States)

    McCarthy, Timothy; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-10-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North America's NTSC and European SECAM and PAL television systems that are then recorded using various video formats. This technology has recently being employed as a front-line, remote sensing technology for damage assessment post-disaster. This paper traces the development of spatial video as a remote sensing tool from the early 1980s to the present day. The background to a new spatial-video research initiative based at National University of Ireland, Maynooth, (NUIM) is described. New improvements are proposed and include; low-cost encoders, easy to use software decoders, timing issues and interoperability. These developments will enable specialists and non-specialists collect, process and integrate these datasets within minimal support. This integrated approach will enable decision makers to access relevant remotely sensed datasets quickly and so, carry out rapid damage assessment during and post-disaster.

  3. MAST's Integrated Data Access Management system: IDAM

    International Nuclear Information System (INIS)

    Muir, D.G.; Appel, L.; Conway, N.J.; Kirk, A.; Martin, R.; Meyer, H.; Storrs, J.; Taylor, D.; Thomas-Davies, N.; Waterhouse, J.

    2008-01-01

    A new Integrated Data Access Management system, IDAM, has been created to address specific data management issues of the MAST spherical Tokamak. For example, this system enables access to numerous file formats, both legacy and modern (IDA, Ufile, netCDF, HDF5, MDSPlus, PPF, JPF). It adds data quality values at the signal level, and automatically corrects for problems in data: in timings, calibrations, and labelling. It also builds new signals from signal components. The IDAM data server uses a hybrid XML-relational database to record how data are accessed, whether locally or remotely, and how alias and generic signal names are mapped to true names. Also, XML documents are used to encode the details of data corrections, as well as definitions of composite signals and error models. The simple, user friendly, API and accessor function library, written in C on Linux, is available for applications in C, C++, IDL and Fortran-90/95/2003 with good performance: a MAST plasma current trace (28 kbytes of data), requested using a generic name and with data corrections applied, is delivered over a 100 Mbit/s network in ∼13 ms

  4. Integrated Traffic Flow Management Decision Making

    Science.gov (United States)

    Grabbe, Shon R.; Sridhar, Banavar; Mukherjee, Avijit

    2009-01-01

    A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

  5. Integrated NPP life cycle management - Agency's approach

    International Nuclear Information System (INIS)

    Gueorguiev, B.

    2002-01-01

    Full text: The number of nuclear power plants (NPPs) operating in the world has been roughly constant for the past seven years. There are 438 reactors of 353,489 MW(e) capacity in the world and they generated 2448.9 TWh in 2001 giving a total world operating experience with nuclear power of 10,363 years. About 230 units have reached already over 15 years of operation and significant number of these plants are fully depreciated. Share of nuclear power in electricity production sector in Member States utilising nuclear power plants represents a meaningful amount and in 14 countries it exceeds 30%. Therefore, a loss of this share should be covered by new installed capacities either from conventional or alternative sources of electricity generation. Recent forecasts, for nuclear power use over the next two decades range from ∼350 to ∼500 GW(e) worldwide. While assessing the need for any nuclear power related programmes there are several important factors that must be considered since even 350 GW(e) is a very large programme requiring several hundred thousand highly qualified personnel and a substantial infrastructure to assure its continued safe, reliable and cost-effective operation. It is important to assure reliable, safe and economic beneficial performance of the plant, which requires in turn an appropriated management of any activity connected with any taken period of a plant life starting from design and ending by the decided mode of decommissioning. The period between the first and the last payment for the activities connected with the existence of a plant could be defined as a life cycle of the plant. Such integrated approach requires considering the life cycle of the plant in a much broader sense than just operational life and is characterized by the variety of activities and their management represents in a whole a plant life management programme (PLIM). Therefore PLIM could be defined as an aggregate (totality) of technical, financial, economical and

  6. Integrated vector management for malaria control

    Directory of Open Access Journals (Sweden)

    Impoinvil Daniel E

    2008-12-01

    Full Text Available Abstract Integrated vector management (IVM is defined as "a rational decision-making process for the optimal use of resources for vector control" and includes five key elements: 1 evidence-based decision-making, 2 integrated approaches 3, collaboration within the health sector and with other sectors, 4 advocacy, social mobilization, and legislation, and 5 capacity-building. In 2004, the WHO adopted IVM globally for the control of all vector-borne diseases. Important recent progress has been made in developing and promoting IVM for national malaria control programmes in Africa at a time when successful malaria control programmes are scaling-up with insecticide-treated nets (ITN and/or indoor residual spraying (IRS coverage. While interventions using only ITNs and/or IRS successfully reduce transmission intensity and the burden of malaria in many situations, it is not clear if these interventions alone will achieve those critical low levels that result in malaria elimination. Despite the successful employment of comprehensive integrated malaria control programmes, further strengthening of vector control components through IVM is relevant, especially during the "end-game" where control is successful and further efforts are required to go from low transmission situations to sustained local and country-wide malaria elimination. To meet this need and to ensure sustainability of control efforts, malaria control programmes should strengthen their capacity to use data for decision-making with respect to evaluation of current vector control programmes, employment of additional vector control tools in conjunction with ITN/IRS tactics, case-detection and treatment strategies, and determine how much and what types of vector control and interdisciplinary input are required to achieve malaria elimination. Similarly, on a global scale, there is a need for continued research to identify and evaluate new tools for vector control that can be integrated with

  7. Weather information integration in transportation management center (TMC) operations.

    Science.gov (United States)

    2011-01-02

    This report presents the results of the third phase of an on-going FHWA study on weather integration in Transportation Management Center (TMC) operations. The report briefly describes the earlier phases of the integration study, summarizes the findin...

  8. Requirements Definition for ORNL Trusted Corridors Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Hill, David E [ORNL; Smith, Cyrus M [ORNL; DeNap, Frank A [ORNL; White, James D [ORNL; Gross, Ian G [ORNL; Gorman, Bryan L [ORNL; Hively, Lee M [ORNL; Abercrombie, Robert K [ORNL

    2008-02-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  9. Requirements Definition for ORNL Trusted Corridors Project

    International Nuclear Information System (INIS)

    Walker, Randy M; Hill, David E; Smith, Cyrus M; DeNap, Frank A; White, James D; Gross, Ian G; Gorman, Bryan L; Hively, Lee M; Abercrombie, Robert K

    2008-01-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  10. integrated identity and integrated identity and access management

    African Journals Online (AJOL)

    eobe

    Management System (T-IAMS) is a fingerprint biometric database that centrally manages students' identity, course a fingerprint ... registration, library and medical services information. .... based application and a web-based application.

  11. The integrity management cycle as a business process

    Energy Technology Data Exchange (ETDEWEB)

    Ackhurst, Trent B.; Peverelli, Romina P. [PIMS - Pipeline Integrity Management Specialists of London Ltd. (United Kingdom).

    2009-07-01

    It is a best-practice Oil and Gas pipeline integrity and reliability technique to apply integrity management cycles. This is conforms to the business principles of continuous improvement. This paper examines the integrity management cycle - both goals and objectives and subsequent component steps - from a business perspective. Traits that businesses require, to glean maximum benefit from such a cycle, are highlighted. A case study focuses upon an integrity and reliability process developed to apply to pipeline operators. installations. This is compared and contrasted to the pipeline integrity management cycle to underline both cycles. consistency with the principles of continuous improvement. (author)

  12. Integrated Weed Management Strategies for Control of Hydrilla

    National Research Council Canada - National Science Library

    Nelson, Linda S; Shearer, Judy F

    2009-01-01

    ...), and the fungal pathogen Mycoleptodiscus terrestris (Gerd.) Ostazeski, applied alone and in combination with one another, as an integrated weed management strategy against the nuisance aquatic plant, hydrilla...

  13. Integrated waste management - Looking beyond the solid waste horizon

    International Nuclear Information System (INIS)

    Seadon, J.K.

    2006-01-01

    Waste as a management issue has been evident for over four millennia. Disposal of waste to the biosphere has given way to thinking about, and trying to implement, an integrated waste management approach. In 1996 the United Nations Environmental Programme (UNEP) defined 'integrated waste management' as 'a framework of reference for designing and implementing new waste management systems and for analysing and optimising existing systems'. In this paper the concept of integrated waste management as defined by UNEP is considered, along with the parameters that constitute integrated waste management. The examples used are put into four categories: (1) integration within a single medium (solid, aqueous or atmospheric wastes) by considering alternative waste management options (2) multi-media integration (solid, aqueous, atmospheric and energy wastes) by considering waste management options that can be applied to more than one medium (3) tools (regulatory, economic, voluntary and informational) and (4) agents (governmental bodies (local and national), businesses and the community). This evaluation allows guidelines for enhancing success: (1) as experience increases, it is possible to deal with a greater complexity; and (2) integrated waste management requires a holistic approach, which encompasses a life cycle understanding of products and services. This in turn requires different specialisms to be involved in the instigation and analysis of an integrated waste management system. Taken together these advance the path to sustainability

  14. Integrating research with management: The case of Katavi National ...

    African Journals Online (AJOL)

    Integrating research with management: The case of Katavi National Park, Tanzania. ... national park: (i) reduced water flow caused by local damming of the Katuma River, ... to both management and policy makers for tackling these problems.

  15. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  16. Integrated Climate Smart Flood Management for Accra, Ghana ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · What we do ... The research team will use evidence to develop an integrated climate smart flood management framework to support policymaking. ... The Ministry of Environment, Science, Technology, and Innovation will manage the ...

  17. INTEGRATED WATERSHED MANAGEMENT: PRINCIPLES AND PRACTICE. Book Review

    Science.gov (United States)

    Through a wide range of information and topics, Integrated Watershed Management Principles and Practice shows how involved the watershed management planning process can be. The book is informative, and the author obviously has researched the subject thoroughly. The book's case...

  18. Integrated solid waste management: a palliative to existing waste ...

    African Journals Online (AJOL)

    As a concept, Integrated Solid Waste Management (ISWM) is a sustainable ... on the perspective of consumers on waste generation, collection and disposal. ... to effective solid waste management in the case study area; non-sorting and ...

  19. Roots Air Management System with Integrated Expander

    Energy Technology Data Exchange (ETDEWEB)

    Stretch, Dale [Eaton Corporation, Menomonee Falls, WI (United States); Wright, Brad [Eaton Corporation, Menomonee Falls, WI (United States); Fortini, Matt [Eaton Corporation, Menomonee Falls, WI (United States); Fink, Neal [Ballard Power Systems, Burnaby, BC (Canada); Ramadan, Bassem [Kettering Univ., Flint, MI (United States); Eybergen, William [Eaton Corporation, Menomonee Falls, WI (United States)

    2016-07-06

    PEM fuel cells remain an emerging technology in the vehicle market with several cost and reliability challenges that must be overcome in order to increase market penetration and acceptance. The DOE has identified the lack of a cost effective, reliable, and efficient air supply system that meets the operational requirements of a pressurized PEM 80kW fuel cell as one of the major technological barriers that must be overcome. This project leveraged Roots positive displacement development advancements and demonstrated an efficient and low cost fuel cell air management system. Eaton built upon its P-Series Roots positive displacement design and shifted the peak efficiency making it ideal for use on an 80kW PEM stack. Advantages to this solution include: • Lower speed of the Roots device eliminates complex air bearings present on other systems. • Broad efficiency map of Roots based systems provides an overall higher drive cycle fuel economy. • Core Roots technology has been developed and validated for other transportation applications. Eaton modified their novel R340 Twin Vortices Series (TVS) Roots-type supercharger for this application. The TVS delivers more power and better fuel economy in a smaller package as compared to other supercharger technologies. By properly matching the helix angle with the rotor’s physical aspect ratio, the supercharger’s peak efficiency can be moved to the operating range where it is most beneficial for the application. The compressor was designed to meet the 90 g/s flow at a pressure ratio of 2.5, similar in design to the P-Series 340. A net shape plastic expander housing with integrated motor and compressor was developed to significantly reduce the cost of the system. This integrated design reduced part count by incorporating an overhung expander and motor rotors into the design such that only four bearings and two shafts were utilized.

  20. Integrated Systems Health Management for Space Exploration

    Science.gov (United States)

    Uckun, Serdar

    2005-01-01

    Integrated Systems Health Management (ISHM) is a system engineering discipline that addresses the design, development, operation, and lifecycle management of components, subsystems, vehicles, and other operational systems with the purpose of maintaining nominal system behavior and function and assuring mission safety and effectiveness under off-nominal conditions. NASA missions are often conducted in extreme, unfamiliar environments of space, using unique experimental spacecraft. In these environments, off-nominal conditions can develop with the potential to rapidly escalate into mission- or life-threatening situations. Further, the high visibility of NASA missions means they are always characterized by extraordinary attention to safety. ISHM is a critical element of risk mitigation, mission safety, and mission assurance for exploration. ISHM enables: In-space maintenance and repair; a) Autonomous (and automated) launch abort and crew escape capability; b) Efficient testing and checkout of ground and flight systems; c) Monitoring and trending of ground and flight system operations and performance; d) Enhanced situational awareness and control for ground personnel and crew; e) Vehicle autonomy (self-sufficiency) in responding to off-nominal conditions during long-duration and distant exploration missions; f) In-space maintenance and repair; and g) Efficient ground processing of reusable systems. ISHM concepts and technologies may be applied to any complex engineered system such as transportation systems, orbital or planetary habitats, observatories, command and control systems, life support systems, safety-critical software, and even the health of flight crews. As an overarching design and operational principle implemented at the system-of-systems level, ISHM holds substantial promise in terms of affordability, safety, reliability, and effectiveness of space exploration missions.

  1. Integrated Water Resources Management: A Global Review

    Science.gov (United States)

    Srinivasan, V.; Cohen, M.; Akudago, J.; Keith, D.; Palaniappan, M.

    2011-12-01

    The diversity of water resources endowments and the societal arrangements to use, manage, and govern water makes defining a single paradigm or lens through which to define, prioritize and evaluate interventions in the water sector particularly challenging. Integrated Water Resources Management (IWRM) emerged as the dominant intervention paradigm for water sector interventions in the early 1990s. Since then, while many successful implementations of IWRM have been demonstrated at the local, basin, national and trans-national scales, IWRM has also been severely criticized by the global water community as "having a dubious record that has never been comprehensively analyzed", "curiously ambiguous", and "ineffective at best and counterproductive at worst". Does IWRM hold together as a coherent paradigm or is it a convenient buzzword to describe a diverse collection of water sector interventions? We analyzed 184 case study summaries of IWRM interventions on the Global Water Partnership (GWP) website. The case studies were assessed to find the nature, scale, objectives and outcomes of IWRM. The analysis does not suggest any coherence in IWRM as a paradigm - but does indicate distinct regional trends in IWRM. First, IWRM was done at very different scales in different regions. In Africa two-thirds of the IWRM interventions involved creating national or transnational organizations. In contrast, in Asia and South America, almost two-thirds were watershed, basin, or local body initiatives. Second, IWRM interventions involved very different types of activities in different regions. In Africa and Europe, IWRM entailed creation of policy documents, basin plans and institution building. In contrast, in Asia and Latin America the interventions were much more likely to entail new technology, infrastructure or watershed measures. In Australia, economic measures, new laws and enforcement mechanisms were more commonly used than anywhere else.

  2. Improve data integration performance by employing metadata management utility

    Energy Technology Data Exchange (ETDEWEB)

    Wei, M.; Sung, A.H. [New Mexico Petroleum Recovery Research Center, Socorro, NM (United States)

    2005-07-01

    This conference paper explored ways of integrating petroleum and exploration data obtained from different sources in order to provide more comprehensive data for various analysis purposes and to improve the integrity and consistency of integrated data. This paper proposes a methodology to enhance oil and gas industry data integration performance by cooperating data management utilities in Microsoft SQL Server database management system (DBMS) for small scale data integration without support of commercial software. By semi-automatically capturing metadata, data sources are investigated in detail, data quality problems are partially cleansed, and the performance of data integration is improved. 20 refs., 7 tabs., 1 fig.

  3. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  4. HANFORD SITE RIVER CORRIDOR CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.

    2006-01-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km 2 Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal

  5. Integrated Analysis of Flow, Form, and Function for River Management and Design Testing

    Science.gov (United States)

    Lane, B. A. A.; Pasternack, G. B.; Sandoval Solis, S.

    2017-12-01

    Rivers are highly complex, dynamic systems that support numerous ecosystem functions including transporting sediment, modulating biogeochemical processes, and regulating habitat availability for native species. The extent and timing of these functions is largely controlled by the interplay of hydrologic dynamics (i.e. flow) and the shape and composition of the river corridor (i.e. form). This study applies synthetic channel design to the evaluation of river flow-form-function linkages, with the aim of evaluating these interactions across a range of flows and forms to inform process-driven management efforts with limited data and financial requirements. In an application to California's Mediterranean-montane streams, the interacting roles of channel form, water year type, and hydrologic impairment were evaluated across a suite of ecosystem functions related to hydrogeomorphic processes, aquatic habitat, and riparian habitat. Channel form acted as the dominant control on hydrogeomorphic processes considered, while water year type controlled salmonid habitat functions. Streamflow alteration for hydropower increased redd dewatering risk and altered aquatic habitat availability and riparian recruitment dynamics. Study results highlight critical tradeoffs in ecosystem function performance and emphasize the significance of spatiotemporal diversity of flow and form at multiple scales for maintaining river ecosystem integrity. The approach is broadly applicable and extensible to other systems and ecosystem functions, where findings can be used to characterize complex controls on river ecosystems, assess impacts of proposed flow and form alterations, and inform river restoration strategies.

  6. Development of integrated analytical data management system

    International Nuclear Information System (INIS)

    Onishi, Koichi; Wachi, Isamu; Hiroki, Toshio

    1986-01-01

    The Analysis Subsection of Technical Service Section, Tokai Reprocessing Plant, Tokai Works, is engaged in analysis activities required for the management of processes and measurements in the plant. Currently, it has been desired to increase the reliability of analytical data and to perform analyses more rapidly to cope with the increasing number of analysis works. To meet this end, on-line data processing has been promoted and advanced analytical equipment has been introduced in order to enhance automization. In the present study, an integrated analytical data mangement system is developed which serves for improvement of reliability of analytical data as well as for rapid retrieval and automatic compilation of these data. Fabrication of a basic model of the system has been nearly completed and test operation has already been started. In selecting hardware to be used, examinations were made on easiness of system extension, Japanese language processing function for improving man-machine interface, large-capacity auxiliary memory system, and data base processing function. The existing analysis works wer reviewed in establishing the basic design of the system. According to this basic design, the system can perform such works as analysis of application slips received from clients as well as recording, sending, filing and retrieval of analysis results. (Nogami, K.)

  7. Integrated vector management: The Zambian experience

    Directory of Open Access Journals (Sweden)

    Katebe Cecilia

    2008-08-01

    Full Text Available Abstract Background The Zambian Malaria Control Programme with the Roll Back Malaria (RBM partners have developed the current National Malaria Strategic Plan (NMSP 2006–2011 which focuses on prevention based on the Integrated Vector Management (IVM strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. Achievements IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Conclusion Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  8. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  9. Research notes : are safety corridors really safe? Evaluation of the corridor safety improvement program.

    Science.gov (United States)

    1998-08-26

    High accident frequencies on Oregons highway corridors are of concern to the Oregon Department of Transportation (ODOT). : ODOT adopted the Corridor Safety Improvement Program as part of an overall program of safety improvements using federal and ...

  10. Integrated Data Management Processes Expedite Common Data Management Tasks in Autism Research

    OpenAIRE

    Farach, Frank; Sinanis, Naralys; Hawthorne, Julie; Agnew, Henry; Schantz, Tricia; Jensen, Bill; Rozenblit, Leon

    2013-01-01

    We compare the efficiency of (1) just-in-time data management, in which data are cleaned prior to each analysis, and (2) integrated data management, in which data are centralized, cleaned up front, and made available via a query interface. Integrated data management was associated with faster completion of data management requests.

  11. Integrated, regional approach to risk management of industrial systems

    International Nuclear Information System (INIS)

    Chakraborty, S.

    1992-01-01

    This paper focuses on the following four main issues: (1) necessity for an integrated, regional approach to risk management of industrial systems; (2) principles of risk management; (3) integrated approach and overall methodology; and (4) implementation of risk management strategies on a regional basis. The U.N. Interagency project on risk management for large industrial areas, which is a pioneer type of international initiative for an integrated approach to risk management, is discussed in this context. Another encouraging activity for further development of overall methodologies for risk management is the ongoing project on the risk and safety of technical systems at the Swiss Federal Institute of Technology in Aurich. The concept of integral risk management takes into account multidimensional factors including technical, economic, political, social, and ethical considerations to allow a well-balanced decision-making process

  12. Integrating Medical Supply as Part of the Army's Single Integrated Materiel Manager Concept--Why or why Not?

    National Research Council Canada - National Science Library

    Baxter, Shelia

    1998-01-01

    .... To achieve the goal of seamless logistics integration capabilities, one concept is to establish a Single Integrated Materiel Manager for the Army which envisions integrating all such functions...

  13. Integrated management system: expedience and organizational aspects

    Directory of Open Access Journals (Sweden)

    Trunova Ekaterina Viktorovna

    2011-06-01

    Full Text Available The correctly lined up management system is an important element of intellectual capital of company and promotes growth of its market value. In the article grounded, that realization of strategy is impossible without intercommunication of strategic management and business-process management. Such organizational aspects of administrative activity, as role conception of management, strategic office and process office, are observed.

  14. Law for the Integral Management of Waste No. 8839

    International Nuclear Information System (INIS)

    2010-01-01

    The Law for Integral Waste Management No. 8839 was enacted in Costa Rica in 2010. The purpose of this law has been to regulate the integral management of residues and the efficient use of the resources, through the planning and execution of regulatory actions, operational, financial, administrative, educational, environmental and healthy of monitoring and evaluation [es

  15. Integrated Rural-Urban Water Management for Climate Based ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    There are serious short- and long-term consequences on human health, physical assets, economic ... To work, adaptive climate-proof integrated urban water management must extend throughout the whole catchment, an approach known as integrated water resource management. ... Careers · Contact Us · Site map.

  16. The nexus between integrated natural resources management and integrated water resources management in southern Africa

    Science.gov (United States)

    Twomlow, Stephen; Love, David; Walker, Sue

    The low productivity of smallholder farming systems and enterprises in the drier areas of the developing world can be attributed mainly to the limited resources of farming households and the application of inappropriate skills and practices that can lead to the degradation of the natural resource base. This lack of development, particularly in southern Africa, is of growing concern from both an agricultural and environmental perspective. To address this lack of progress, two development paradigms that improve land and water productivity have evolved, somewhat independently, from different scientific constituencies. One championed by the International Agricultural Research constituency is Integrated Natural Resource Management (INRM), whilst the second championed predominantly by Environmental and Civil Engineering constituencies is Integrated Water Resources Management (IWRM). As a result of similar objectives of working towards the millennium development goals of improved food security and environmental sustainability, there exists a nexus between the constituencies of the two paradigms, particularly in terms of appreciating the lessons learned. In this paper lessons are drawn from past INRM research that may have particular relevance to IWRM scientists as they re-direct their focus from blue water issues to green water issues, and vice-versa. Case studies are drawn from the management of water quality for irrigation, green water productivity and a convergence of INRM and IWRM in the management of gold panning in southern Zimbabwe. One point that is abundantly clear from both constituencies is that ‘one-size-fits-all’ or silver bullet solutions that are generally applicable for the enhancement of blue water management/formal irrigation simply do not exist for the smallholder rainfed systems.

  17. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  18. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  19. Basic principles, contents, and benefits of an integrated management system

    International Nuclear Information System (INIS)

    Schwarzin, Juergen

    2010-01-01

    The basic principles and contents of an integrated management system are presented. The report focuses on the benefits and the experience accumulated in using an integrated management system. Integrated management systems are characterized by 2 features in particular: - On the one hand, by a system holistically controlling and describing all processes within a company which are necessary to achieve the company policy and company goals as defined. - On the other hand, it combines in one integrated management system various different aspects (such as quality, environmental protection, and safety) and the resulting requirements. Successful implementation of an integrated management system requires a clear commitment by company management to the integrated management system serving as a management tool. Implementation must be assigned the appropriate importance in the company. It must not be viewed as an instrument preserving 'status quo.' Instead, it must be seen as a tool for long-term improvement of the company. Application of the integrated management system minimizes the probability of occurrence of events, but is not able to reduce it to zero. (orig.)

  20. FRACOR-software toolbox for deterministic mapping of fracture corridors in oil fields on AutoCAD platform

    Science.gov (United States)

    Ozkaya, Sait I.

    2018-03-01

    Fracture corridors are interconnected large fractures in a narrow sub vertical tabular array, which usually traverse entire reservoir vertically and extended for several hundreds of meters laterally. Fracture corridors with their huge conductivities constitute an important element of many fractured reservoirs. Unlike small diffuse fractures, actual fracture corridors must be mapped deterministically for simulation or field development purposes. Fracture corridors can be identified and quantified definitely with borehole image logs and well testing. However, there are rarely sufficient image logs or well tests, and it is necessary to utilize various fracture corridor indicators with varying degrees of reliability. Integration of data from many different sources, in turn, requires a platform with powerful editing and layering capability. Available commercial reservoir characterization software packages, with layering and editing capabilities, can be cost intensive. CAD packages are far more affordable and may easily acquire the versatility and power of commercial software packages with addition of a small software toolbox. The objective of this communication is to present FRACOR, a software toolbox which enables deterministic 2D fracture corridor mapping and modeling on AutoCAD platform. The FRACOR toolbox is written in AutoLISPand contains several independent routines to import and integrate available fracture corridor data from an oil field, and export results as text files. The resulting fracture corridor maps consists mainly of fracture corridors with different confidence levels from combination of static and dynamic data and exclusion zones where no fracture corridor can exist. The exported text file of fracture corridors from FRACOR can be imported into an upscaling programs to generate fracture grid for dual porosity simulation or used for field development and well planning.

  1. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Charlebois, P.; Hart, R.S.; Hopkins, J.R.

    1998-01-01

    Commercial versions of CANDU reactors were put into service starting more than 25 years ago. The first unit of Ontario Hydro's Pickering A station was put into service in 1971, and Bruce A in 1977. Most CANDU reactors, however, are only now approaching their mid-life of 15 to 20 years of operation. In particular, the first series of CANDU 6 plants which entered service in the early 1980's were designed for a 30 year life and are now approaching mid life. The current CANDU 6 design is based on a 40 year life as a result of advancement in design and materials through research and development. In order to assure safe and economic operation of these reactors, a comprehensive CANDU Plant Life Management (PLIM) program is being developed from the knowledge gained during the operation of Ontario Hydro's Pickering, Bruce, and Darlington stations, worldwide information from CANDU 6 stations, CANDU research and development programs, and other national and international sources. This integration began its first phase in 1994, with the identification of most of the critical systems structures and components in these stations, and a preliminary assessment of degradation and mechanisms that could affect their fitness for service for their planned life. Most of these preliminary assessments are now complete, together with the production of the first iteration of Life Management Plans for several of the systems and components. The Generic CANDU 6 PLIM program is now reaching its maturity, with formal processes to systematically identify and evaluate the major CSSCs in the station, and a plan to ensure that the plant surveillance, operation, and maintenance programs monitor and control component degradation well within the original design specifications essential for the plant life attainment. A Technology Watch program is being established to ensure that degradation mechanisms which could impact on plant life are promptly investigated and mitigating programs established. The

  2. IM (Integrity Management) software must show flexibility to local codes

    Energy Technology Data Exchange (ETDEWEB)

    Brors, Markus [ROSEN Technology and Research Center GmbH (Germany); Diggory, Ian [Macaw Engineering Ltd., Northumberland (United Kingdom)

    2009-07-01

    There are many internationally recognized codes and standards, such as API 1160 and ASME B31.8S, which help pipeline operators to manage and maintain the integrity of their pipeline networks. However, operators in many countries still use local codes that often reflect the history of pipeline developments in their region and are based on direct experience and research on their pipelines. As pipeline companies come under increasing regulatory and financial pressures to maintain the integrity of their networks, it is important that operators using regional codes are able to benchmark their integrity management schemes against these international standards. Any comprehensive Pipeline Integrity Management System (PIMS) software package should therefore not only incorporate industry standards for pipeline integrity assessment but also be capable of implementing regional codes for comparison purposes. This paper describes the challenges and benefits of incorporating one such set of regional pipeline standards into ROSEN Asset Integrity Management Software (ROAIMS). (author)

  3. SIRSALE: integrated video database management tools

    Science.gov (United States)

    Brunie, Lionel; Favory, Loic; Gelas, J. P.; Lefevre, Laurent; Mostefaoui, Ahmed; Nait-Abdesselam, F.

    2002-07-01

    Video databases became an active field of research during the last decade. The main objective in such systems is to provide users with capabilities to friendly search, access and playback distributed stored video data in the same way as they do for traditional distributed databases. Hence, such systems need to deal with hard issues : (a) video documents generate huge volumes of data and are time sensitive (streams must be delivered at a specific bitrate), (b) contents of video data are very hard to be automatically extracted and need to be humanly annotated. To cope with these issues, many approaches have been proposed in the literature including data models, query languages, video indexing etc. In this paper, we present SIRSALE : a set of video databases management tools that allow users to manipulate video documents and streams stored in large distributed repositories. All the proposed tools are based on generic models that can be customized for specific applications using ad-hoc adaptation modules. More precisely, SIRSALE allows users to : (a) browse video documents by structures (sequences, scenes, shots) and (b) query the video database content by using a graphical tool, adapted to the nature of the target video documents. This paper also presents an annotating interface which allows archivists to describe the content of video documents. All these tools are coupled to a video player integrating remote VCR functionalities and are based on active network technology. So, we present how dedicated active services allow an optimized video transport for video streams (with Tamanoir active nodes). We then describe experiments of using SIRSALE on an archive of news video and soccer matches. The system has been demonstrated to professionals with a positive feedback. Finally, we discuss open issues and present some perspectives.

  4. 76 FR 34139 - Northeast Corridor Safety Committee; Meeting Postponement

    Science.gov (United States)

    2011-06-10

    .... 2] Northeast Corridor Safety Committee; Meeting Postponement AGENCY: Federal Railroad Administration... announced the first meeting of the Northeast Corridor Safety Committee, a Federal Advisory Committee... future date. DATES: The meeting of the Northeast Corridor Safety Committee scheduled to commence on...

  5. 77 FR 3326 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2012-01-23

    .... 3] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of Northeast Corridor Safety Committee Meeting. SUMMARY: FRA announced the first meeting of the Northeast Corridor Safety Committee, a Federal...

  6. 76 FR 32391 - Northeast Corridor Safety Committee; Notice of Meeting

    Science.gov (United States)

    2011-06-06

    .... 1] Northeast Corridor Safety Committee; Notice of Meeting AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Announcement of the Northeast Corridor Safety Committee Meeting. SUMMARY: FRA announces the first meeting of the Northeast Corridor Safety Committee, a...

  7. Space station operations task force. Panel 4 report: Management integration

    Science.gov (United States)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  8. Dynamic management of integrated residential energy systems

    Science.gov (United States)

    Muratori, Matteo

    dissertation presents a bottom-up highly resolved model of a generic residential energy eco-system in the United States. The model is able to capture the entire energy footprint of an individual household, to include all appliances, space conditioning systems, in-home charging of plug-in electric vehicles, and any other energy needs, viewing residential and transportation energy needs as an integrated continuum. The residential energy eco-system model is based on a novel bottom-up approach that quantifies consumer energy use behavior. The incorporation of stochastic consumer behaviors allows capturing the electricity consumption of each residential specific end-use, providing an accurate estimation of the actual amount of available controllable resources, and for a better understanding of the potential of residential demand response programs. A dynamic energy management framework is then proposed to manage electricity consumption inside each residential energy eco-system. Objective of the dynamic energy management framework is to optimize the scheduling of all the controllable appliances and in-home charging of plug-in electric vehicles to minimize cost. Such an automated energy management framework is used to simulate residential demand response programs, and evaluate their impact on the electric power infrastructure. For instance, time-varying electricity pricing might lead to synchronization of the individual residential demands, creating pronounced rebound peaks in the aggregate demand that are higher and steeper than the original demand peaks that the time-varying electricity pricing structure intended to eliminate. The modeling tools developed in this study can serve as a virtual laboratory for investigating fundamental economic and policy-related questions regarding the interplay of individual consumers with energy use. The models developed allow for evaluating the impact of different energy policies, technology adoption, and electricity price structures on the total

  9. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  10. Using remote sensing to inform integrated coastal zone management

    CSIR Research Space (South Africa)

    Roberts, W

    2010-06-01

    Full Text Available TO INFORM INTERGRATED COASTAL ZONE MANAGEMENT GISSA Western Cape Regional Meeting Wesley Roberts & Melanie Luck-Vogel 2 June 2010 CSIR NRE Ecosystems Earth Observation Group What is Integrated Coastal Zone Management? Integrated coastal management... D1D1 B a n d 1 Band 2 Quick theory of CVA Magnitude Direction ( ) ( )22 xaxbyaybM ?+?= Quadrant 1 (++) Accretion Quadrant 2 (-+) Quadrant 4 (+-) Quadrant 3 (--) Erosion CVA Results & Conclusions ? Change in image time series...

  11. Ergonomics Integration Omproving Production Process Management in Enterprises of Latvia

    OpenAIRE

    Henrijs Kaļķis

    2013-01-01

    Dotoral thesis ERGONOMICS INTEGRATION IMPROVING PRODUCTION PROCESS MANAGEMENT IN ENTERPRISES OF LATVIA ANNOTATION Ergonomics integration in process management has great significance in organisations` growth of productivity. It is a new approach to entrepreneurship and business strategy, where ergonomic aspects and values are taken into account in ensuring the effective process management and profitability of enterprises. This study is aimed at solution of the problem of e...

  12. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  13. Developing Tribal Integrated Waste Management Plans

    Science.gov (United States)

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  14. Integrated Facilities Management and Fixed Asset Accounting.

    Science.gov (United States)

    Golz, W. C., Jr.

    1984-01-01

    A record of a school district's assets--land, buildings, machinery, and equipment--can be a useful management tool that meets accounting requirements and provides appropriate information for budgeting, forecasting, and facilities management. (MLF)

  15. Reducing the impact of speed dispersion on subway corridor flow.

    Science.gov (United States)

    Qiao, Jing; Sun, Lishan; Liu, Xiaoming; Rong, Jian

    2017-11-01

    The rapid increase in the volume of subway passengers in Beijing has necessitated higher requirements for the safety and efficiency of subway corridors. Speed dispersion is an important factor that affects safety and efficiency. This paper aims to analyze the management control methods for reducing pedestrian speed dispersion in subways. The characteristics of the speed dispersion of pedestrian flow were analyzed according to field videos. The control measurements which were conducted by placing traffic signs, yellow marking, and guardrail were proposed to alleviate speed dispersion. The results showed that the methods of placing traffic signs, yellow marking, and a guardrail improved safety and efficiency for all four volumes of pedestrian traffic flow, and the best-performing control measurement was guardrails. Furthermore, guardrails' optimal position and design measurements were explored. The research findings provide a rationale for subway managers in optimizing pedestrian traffic flow in subway corridors. Copyright © 2017. Published by Elsevier Ltd.

  16. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  17. Seasonal hydroclimatic impacts of Sun Corridor expansion

    International Nuclear Information System (INIS)

    Georgescu, M; Mahalov, A; Moustaoui, M

    2012-01-01

    Conversion of natural to urban land forms imparts influence on local and regional hydroclimate via modification of the surface energy and water balance, and consideration of such effects due to rapidly expanding megapolitan areas is necessary in light of the growing global share of urban inhabitants. Based on a suite of ensemble-based, multi-year simulations using the Weather Research and Forecasting (WRF) model, we quantify seasonally varying hydroclimatic impacts of the most rapidly expanding megapolitan area in the US: Arizona’s Sun Corridor, centered upon the Greater Phoenix metropolitan area. Using a scenario-based urban expansion approach that accounts for the full range of Sun Corridor growth uncertainty through 2050, we show that built environment induced warming for the maximum development scenario is greatest during the summer season (regionally averaged warming over AZ exceeds 1 °C). Warming remains significant during the spring and fall seasons (regionally averaged warming over AZ approaches 0.9 °C during both seasons), and is least during the winter season (regionally averaged warming over AZ of 0.5 °C). Impacts from a minimum expansion scenario are reduced, with regionally averaged warming ranging between 0.1 and 0.3 °C for all seasons except winter, when no warming impacts are diagnosed. Integration of highly reflective cool roofs within the built environment, increasingly recognized as a cost-effective option intended to offset the warming influence of urban complexes, reduces urban-induced warming considerably. However, impacts on the hydrologic cycle are aggravated via enhanced evapotranspiration reduction, leading to a 4% total accumulated precipitation decrease relative to the non-adaptive maximum expansion scenario. Our results highlight potentially unintended consequences of this adaptation approach within rapidly expanding megapolitan areas, and emphasize the need for undeniably sustainable development paths that account for

  18. Energy Futures Synthesis for West-Wide Section 368 Energy Corridors

    Energy Technology Data Exchange (ETDEWEB)

    O' Neill, Barbara L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gagne, Douglas A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cook, Jeffrey J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Greco, Tessa M [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-05-01

    To comply with Section 368(a) of the Energy Policy Act of 2005 (EPAct), the U.S. Bureau of Land Management (BLM) and the U.S. Forest Service designated 6,000 miles of energy corridors on public and national forest lands in the western United States in 2009. The corridors, commonly referred to as 'West-wide' or 'Section 368' energy corridors, are intended as preferred locations for future siting of electric transmission and distribution lines and for oil, gas, and hydrogen pipelines. In response to a lawsuit filed by several organizations over the corridor designations, the BLM, Forest Service, and the U.S. Department of Energy entered into a Settlement Agreement, directing the formation of the Section 368 Interagency Workgroup to periodically review the energy corridors on a regional basis. In conducting the reviews, the Workgroup identifies new, relevant, existing, publicly available information to make recommendations for revisions, deletions, and additions to the Section 368 energy corridors. This report synthesizes information in available contemporary transmission, pipeline, and energy future studies to inform the regional reviews by providing a snapshot of what the western energy and transmission system will look like generally 10-15 years in the future. After an overview of the western grid implications, the analysis narrows to Region 2 and Region 3 of the BLM Section 368 energy corridors and focuses on the implications of potential developments in the oil, natural gas, and electricity markets in Colorado, New Mexico, Utah, and portions of Arizona and Nevada that could inform the current regional review. This analysis will help inform the Workgroup on potential development within existing corridors and the need for new corridors that have not yet been designated.

  19. Research on Integration of NPP Operational Safety Management Performance Systems

    International Nuclear Information System (INIS)

    Chi, Miao; Shi, Liping

    2014-01-01

    The operational safety management of Nuclear Power Plants demands systematic planning and integrated control. NPPs are following the well-developed safety indicator systems proposed by IAEA Operational Safety Performance Indicator Programme, NRC Reactor Oversight Process or the other institutions. Integration of the systems is proposed to benefiting from the advantages of both systems and avoiding improper application into the real world. The authors analyzed the possibility and necessity for system integration, and propose an indicator system integrating method

  20. ESG Integration and the Investment Management Process : Fundamental Investing Reinvented

    NARCIS (Netherlands)

    van Duuren, Emiel; Plantinga, Auke; Scholtens, Bert

    2016-01-01

    We investigate how conventional asset managers account for environmental, social and governance factors (ESG) in their investment process. We do so on the basis of an international survey among fund managers. We find that many conventional managers integrate responsible investing in their investment

  1. Evolution of river management: up to integrated and beyond?

    NARCIS (Netherlands)

    Straatsma, M.W.; Nooij, R.J.W. de

    2010-01-01

    Integrated river management is heralded as the new style of river management, but it has been preceded by a number of previous styles, and is unlikely to be the last. This article presents the first analysis of the evolution of river management using Spiral Dynamics (SD). SD provides a growth

  2. INTEGRATED SAFETY MANAGEMENT SYSTEM IN AIR TRAFFIC SERVICES

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-06-01

    Full Text Available The article deals with the analysis of the researches conducted in the field of safety management systems.Safety management system framework, methods and tools for safety analysis in Air Traffic Control have been reviewed.Principles of development of Integrated safety management system in Air Traffic Services have been proposed.

  3. Methodology for Mode Selection in Corridor Analysis of Freight Transportation

    OpenAIRE

    Kanafani, Adib

    1984-01-01

    The purpose of tins report is to outline a methodology for the analysis of mode selection in freight transportation. This methodology is intended to partake of transportation corridor analysts, a component of demand analysis that is part of a national transportation process. The methodological framework presented here provides a basis on which specific models and calculation procedures might be developed. It also provides a basis for the development of a data management system suitable for co...

  4. Total Ore Processing Integration and Management

    Energy Technology Data Exchange (ETDEWEB)

    Leslie Gertsch

    2006-05-15

    This report outlines the technical progress achieved for project DE-FC26-03NT41785 (Total Ore Processing Integration and Management) during the period 01 January through 31 March of 2006. (1) Work in Progress: Minntac Mine--Graphical analysis of drill monitor data moved from two-dimensional horizontal patterns to vertical variations in measured and calculated parameters. The rock quality index and the two dimensionless ({pi}) indices developed by Kewen Yin of the University of Minnesota are used by Minntac Mine to design their blasts, but the drill monitor data from any given pattern is obviously not available for the design of that shot. Therefore, the blast results--which are difficult to quantify in a short time--must be back-analyzed for comparison with the drill monitor data to be useful for subsequent blast designs. {pi}{sub 1} indicates the performance of the drill, while {pi}{sub 2} is a measure of the rock resistance to drilling. As would be expected, since a drill tends to perform better in rock that offers little resistance, {pi}{sub 1} and {pi}{sub 2} are strongly inversely correlated; the relationship is a power function rather than simply linear. Low values of each Pi index tend to be quantized, indicating that these two parameters may be most useful above certain minimum magnitudes. (2) Work in Progress: Hibtac Mine--Statistical examination of a data set from Hibtac Mine (Table 1) shows that incorporating information on the size distribution of material feeding from the crusher to the autogenous mills improves the predictive capability of the model somewhat (43% vs. 44% correlation coefficient), but a more important component is production data from preceding days (26% vs. 44% correlation coefficient), determined using exponentially weighted moving average predictive variables. This lag effect likely reflects the long and varied residence times of the different size fragments in the grinding mills. The rock sizes are also correlated with the geologic

  5. Supply chain integration, risk management and manufacturing flexibility

    DEFF Research Database (Denmark)

    Chaudhuri, Atanu; Boer, Harry; Taran, Yariv

    2018-01-01

    , respectively, and manufacturing flexibility. Design/methodology/approach – Using hierarchical regression, data are analyzed from a sample of 343 manufacturing plants in Asia collected in 2013-2014 as part of the International Manufacturing Strategy Survey (IMSS VI). Findings – Internal integration and supply......Purpose – The purpose of this paper is to investigate the impact of internal integration, external integration and supply chain risk management on manufacturing flexibility, and the moderating effect of supply chain risk management on the relationships between internal and external integration...... chain risk management have a direct effect on manufacturing flexibility. Supply chain risk management moderates the relationship between external integration and flexibility. Research limitations/implications – Further research is needed to generalize beyond the flexibility performance of discrete...

  6. Coordinated Traffic Incident and Congestion Management (TIM-CM) : Mitigating Regional Impacts of Major Traffic Incidents in the Seattle I-5 Corridor

    Science.gov (United States)

    2018-02-02

    Within the Seattle metropolitan area, traffic incident management (TIM) operations provide a multi-jurisdictional and coordinated strategy to detect, respond to, and clear traffic incidents so that traffic flow can be restored quickly and safely. The...

  7. QUANTITATIVE СHARACTERISTICS OF COMPLEMENTARY INTEGRATED HEALTH CARE SYSTEM AND INTEGRATED MEDICATION MANAGEMENT INFORMATION SYSTEM

    Directory of Open Access Journals (Sweden)

    L. Yu. Babintseva

    2015-05-01

    i mportant elements of state regulation of the pharmaceutical sector health. For the first time creation of two information systems: integrated medication management infor mation system and integrated health care system in an integrated medical infor mation area, operating based on th e principle of complementarity was justified. Global and technological coefficients of these systems’ functioning were introduced.

  8. Integrated Space Asset Management Database and Modeling

    Science.gov (United States)

    Gagliano, L.; MacLeod, T.; Mason, S.; Percy, T.; Prescott, J.

    The Space Asset Management Database (SAM-D) was implemented in order to effectively track known objects in space by ingesting information from a variety of databases and performing calculations to determine the expected position of the object at a specified time. While SAM-D performs this task very well, it is limited by technology and is not available outside of the local user base. Modeling and simulation can be powerful tools to exploit the information contained in SAM-D. However, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. A more capable data management infrastructure would extend SAM-D to support the larger data sets to be generated by the COI. A service-oriented architecture model will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for visualizations. Based on a web-centric approach, the entire COI will be able to access the data and related analytics. In addition, tight control of information sharing policy will increase confidence in the system, which would encourage industry partners to provide commercial data. SIMON is a Government off the Shelf information sharing platform in use throughout DoD and DHS information sharing and situation awareness communities. SIMON providing fine grained control to data owners allowing them to determine exactly how and when their data is shared. SIMON supports a micro-service approach to system development, meaning M&S and analytic services can be easily built or adapted. It is uniquely positioned to fill this need as an information-sharing platform with a proven track record of successful situational awareness system deployments. Combined with the integration of new and legacy M&S tools, a SIMON-based architecture will provide a robust SA environment for the NASA SA COI that can be extended and expanded indefinitely. First Results of Coherent Uplink from a

  9. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    Directory of Open Access Journals (Sweden)

    Marisa P. de Brito

    2010-03-01

    Full Text Available Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management issues. In this paper, we make use of behavioral theory to explain the current lack of integration. We conclude through abductive reasoning that the reasons for procrastinating integration of sustainability in supply chain and operations management research are the conflicting nature of the task and the inherent context, which is the focus on operations rather than environmental or social issues.

  10. Wild felid species richness affected by a corridor in the Lacandona forest, Mexico

    Directory of Open Access Journals (Sweden)

    Gil–Fernández, M.

    2017-02-01

    Full Text Available Wild felids are one of the most vulnerable species due to habitat loss caused by fragmentation of ecosystems. We analyzed the effect of a structural corridor, defined as a strip of vegetation connecting two habitat patches, on the richness and habitat occupancy of felids on three sites in Marqués de Comillas, Chiapas, one with two isolated forest patches, the second with a structural corridor, and the third inside the Montes Azules Biosphere Reserve. We found only two species (L. pardalis and H. yagouaroundi in the isolated forest patches, five species in the structural corridor, and four species inside the Reserve. The corridor did not significantly affect occupancy, but due to the low detection rates, further investigation is needed to rule out differences. Our results highlight the need to manage habitat connectivity in the remaining forests in order to preserve the felid community of Marqués de Comillas, Chiapas, México.

  11. Landuse Types within Channel Corridor and River Channel Morphology of River Ona, Ibadan, Nigeria

    Directory of Open Access Journals (Sweden)

    Olutoyin Fashae

    2017-12-01

    Full Text Available The importance of river a corridor warrants a well thought out and balanced management approach because it helps in improving or maintaining water quality, protecting wetlands, etc. Hence, this study seeks to identify major landuse types within the River Ona Corridor; examine the impact of these landuse types within the River Ona corridor on its channel morphology and understand the risk being posed by these landuse types. The study is designed by selecting two reaches of six times the average width from each of the four major landuse types that exist along the river corridor. This study revealed that along the downstream section of Eleyele Dam of River Ona, natural forest stabilizes river channel banks, thereby presenting a narrow and shallow width and depth respectively but the widest of all is found at the agricultural zones.

  12. Integrative learning for practicing adaptive resource management

    Directory of Open Access Journals (Sweden)

    Craig A. McLoughlin

    2015-03-01

    Full Text Available Adaptive resource management is a learning-by-doing approach to natural resource management. Its effective practice involves the activation, completion, and regeneration of the "adaptive management cycle" while working toward achieving a flexible set of collaboratively identified objectives. This iterative process requires application of single-, double-, and triple-loop learning, to strategically modify inputs, outputs, assumptions, and hypotheses linked to improving policies, management strategies, and actions, along with transforming governance. Obtaining an appropriate balance between these three modes of learning has been difficult to achieve in practice and building capacity in this area can be achieved through an emphasis on reflexive learning, by employing adaptive feedback systems. A heuristic reflexive learning framework for adaptive resource management is presented in this manuscript. It is built on the conceptual pillars of the following: stakeholder driven adaptive feedback systems; strategic adaptive management (SAM; and hierarchy theory. The SAM Reflexive Learning Framework (SRLF emphasizes the types, roles, and transfer of information within a reflexive learning context. Its adaptive feedback systems enhance the facilitation of single-, double-, and triple-loop learning. Focus on the reflexive learning process is further fostered by streamlining objectives within and across all governance levels; incorporating multiple interlinked adaptive management cycles; having learning as an ongoing, nested process; recognizing when and where to employ the three-modes of learning; distinguishing initiating conditions for this learning; and contemplating practitioner mandates for this learning across governance levels. The SRLF is a key enabler for implementing the "adaptive management cycle," and thereby translating the theory of adaptive resource management into practice. It promotes the heuristics of adaptive management within a cohesive

  13. Energy corridors European Union and Neighbouring countries

    International Nuclear Information System (INIS)

    Van Oostvoorn, F.; Hafner, Manfred; Vailati, Ricardo; Wietschel, Martin

    2007-08-01

    The ENCOURAGED (Energy corridor optimisation for European markets of gas, electricity and hydrogen) project has been launched in beginning 2005 to identify and assess the economically optimal energy corridors between European Union (EU) and neighbouring countries. The objectives of the project are to: Assess the economic optimal energy (electricity, gas and hydrogen) corridors and related network infrastructure for connecting the EU with its neighbouring countries and regions; Identify, quantify and evaluate the barriers to and potential benefits of building optimal energy corridors connecting the EU with its neighbours; Propose necessary policy measures to implement the recommended energy corridors with a focus on investment and the geopolitical framework; Organise stakeholder workshops and seminars to discuss the results and findings and reach consensus among scientists, stakeholders and non-governmental organizations and validate project results

  14. Managing Quadrennial Defense Review Integration: An Overview

    National Research Council Canada - National Science Library

    Schrader, John

    2001-01-01

    ...). The lessons learned from the 1997 Quadrennial Defense Review (QDR 1997) included the need for leadership guidance and integration of analytic activities to sort through the myriad issues that are always confronting the Department of Defense...

  15. Armenia : Towards Integrated Water Resources Management

    OpenAIRE

    World Bank

    2001-01-01

    The objective of this paper is to examine the challenges in the water sector faced by Armenia today, and outline options for management and allocation of its water resources in the future, considering the need for a stable, transparent apublic sector management framework and sustainable resource use for long-term private investment and job creation, and for appropriate balances among water...

  16. An integrated approach to plant life management

    International Nuclear Information System (INIS)

    Fredlund, L.

    1998-01-01

    Plant life is no longer determined by components, almost everything can be replaced. A plant life management program should aim at actions and replacements being performed at the right time. In order to manage this there is need for experience feedback systems, a plant specific risk study and safety upgrades. (author)

  17. Pesticides and public health: integrated methods of mosquito management.

    OpenAIRE

    Rose, R. I.

    2001-01-01

    Pesticides have a role in public health as part of sustainable integrated mosquito management. Other components of such management include surveillance, source reduction or prevention, biological control, repellents, traps, and pesticide-resistance management. We assess the future use of mosquito control pesticides in view of niche markets, incentives for new product development, Environmental Protection Agency registration, the Food Quality Protection Act, and improved pest management strate...

  18. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  19. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  20. Multidimensionality evaluation of supply chain management integration

    Directory of Open Access Journals (Sweden)

    Fernanda Paes Arantes

    2018-03-01

    Full Text Available Integration is constantly reported in the literature as an essential feature of SCM. However, it is as difficult to define as to operationalize it, resulting in a lack of information on how to increase the level of integration among members. Thus, this research aims to evaluate the dimensionality of SCI, to check alignment with the features identified in the literature using multivariate statistical analysis. The methodology used was based on a questionnaire to assess the level of companies integration with suppliers of its supply chain. This instrument consisted of 21 items, with response options: yes, no or not applicable. The questions focused on evaluating the integration with suppliers, so each company consulted could answer a questionnaire for each supplier, since the intensity of relationships varies. Thus, 41 companies participated in the survey, resulting in 205 responses. Full-information item factor analysis and principal component analysis on the correlation matrix tetrachoric were used for the instrument dimensionality analysis. They are appropriate procedures for analysis of dichotomous variables. The results of this analysis enabled grouping the questionnaire items in the following underlying factors: trust, information sharing, partnership, collaboration or cooperation, and coordination. The identification of such factors such as dimensions of SCI enables greater understanding on how to raise the level of integration among the members of a supply chain.

  1. Assessment and management of ecological integrity: Chapter 12

    Science.gov (United States)

    Kwak, Thomas J.; Freeman, Mary C.

    2010-01-01

    Assessing and understanding the impacts of human activities on aquatic ecosystems has long been a focus of ecologists, water resources managers, and fisheries scientists. While traditional fisheries management focused on single-species approaches to enhance fish stocks, there is a growing emphasis on management approaches at community and ecosystem levels. Of course, as fisheries managers shift their attention from narrow (e.g., populations) to broad organizational scales (e.g., communities or ecosystems), ecological processes and management objectives become more complex. At the community level, fisheries managers may strive for a fish assemblage that is complex, persistent, and resilient to disturbance. Aquatic ecosystem level objectives may focus on management for habitat quality and ecological processes, such as nutrient dynamics, productivity, or trophic interactions, but a long-term goal of ecosystem management may be to maintain ecological integrity. However, human users and social, economic, and political demands of fisheries management often result in a reduction of ecological integrity in managed systems, and this conflict presents a principal challenge for the modern fisheries manager. The concepts of biotic integrity and ecological integrity are being applied in fisheries science, natural resource management, and environmental legislation, but explicit definitions of these terms are elusive. Biotic integrity of an ecosystem may be defined as the capability of supporting and maintaining an integrated, adaptive community of organisms having a species composition, diversity, and functional organization comparable to that of a natural habitat of the region (Karr and Dudley 1981). Following that, ecological integrity is the summation of chemical, physical, and biological integrity. Thus, the concept of ecological integrity extends beyond fish and represents a holistic approach for ecosystem management that is especially applicable to aquatic systems. The

  2. Integration and change management for successful mergers; Integration und Change Management bei Fusionen

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, H.G. [Arthur Andersen Business Consulting GmbH, Duesseldorf (Germany)

    2000-05-01

    In the wake of deregulation of the energy markets in Germany, energy companies and electric utilities are confronted with fierce competition on prices and customers. The change of paradigms in the German energy industry calls for new strategies. The article discusses strategic alliances and mergers as one way to cope with the challenges, and explains suitable and proven approaches for corporate integration and change management. (CB) [German] Seit der wettbewerblichen Oeffnung des deutschen Energiemarktes sehen sich die Unternehmen mit einem dramatischen Preis- und Marketingwettbewerb konfrontiert. Aggressive neue Akteure draengen in die lukrativen Maerkte. Aber auch etablierte Teilnehmer suchen neue strategische Positionen und beschleunigen den Paradigmenwechsel in der deutschen Energiewirtschaft. Angesichts dieser Marktentwicklung bestehen massive Anforderungen zur Veraenderung. Unternehmenszusammenschluesse und Kooperationen stellen eine geeignete strategische Reaktion zur Bewaeltigung dieser Herausforderungen dar. Dabei sollten die Risiken von Fusionen nicht unterschaetzt werden. Die meisten Vorhaben scheitern auf Grund fehlender Integrationsprozesse. Ein systematischer Integrationsansatz wird beschrieben. (orig./CB)

  3. Innovation Management in Emerging Technology Ventures – The Concept of an Integrated Idea Management

    DEFF Research Database (Denmark)

    Brem, Alexander; Voigt, K.-I.

    2007-01-01

    , development and sales. Here especially, differentiating potentials are offered for emerging technology ventures. But it is important that idea and innovation management are integrated during the building-up stage while internal and external network structures are still manageable and often consist...... of the managers' and founders' personal contacts. Hence, the earlier an integrated idea management is implemented, the greater is the probability of high numbers of successful innovations.......For decades, suggestion systems have been used to include employees in the innovation process. However, in order to gather superior ideas, integrating external stakeholders is critical to the innovation success. Within this paper, the authors derive a sophisticated model of an integrated idea...

  4. Research on monitoring and management information integration technique in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Yu Ren; Mao Wei

    2013-01-01

    The integration of the waste treatment process and the device status monitoring information and management information is a key problem required to be solved in the information integration of the waste treatment and management. The main content of the monitoring and management information integration is discussed in the paper. The data exchange techniques, which are based on the OPC, FTP and data push technology, are applied to the different monitoring system respectively, according to their development platform, to realize the integration of the waste treatment process and device status monitoring information and management information in a waste treatment center. (authors)

  5. promoting integrated water resources management in south west

    African Journals Online (AJOL)

    eobe

    1, 2 SOUTH WEST REGIONAL CENTRE FOR NATIONAL WATER RESOURCES CAPACITY BUILDING NETWORK,. FEDERAL UNIVERSITY OF ... that an integrated approach to water resource development and management offers the best ...

  6. Evaluation of pre-service training on integrated management of ...

    African Journals Online (AJOL)

    Evaluation of pre-service training on integrated management of neonatal and childhood ... and reviews of pediatric course outlines and other teaching/learning materials. ... Of the 34 programs 22 were diploma nursing, 6 Bachelor of Sciences ...

  7. Integrated Measurement of Crew Resource Management and Technical Flying Skills

    Science.gov (United States)

    1993-08-01

    This report presents the findings of a study designed with two objectives: to produce a prototype performance : measurement instrument (PMI) that integrates the assessment of Crew Resource Management (CRM) and technical flying : skills and to investi...

  8. Integrated management of root-knot nematode (Meloidogyne ...

    African Journals Online (AJOL)

    Integrated management of root-knot nematode (Meloidogyne incognita) for tomato production and productivity. Bayuh Belay1* ... important food and cash crop of the farmers and is ...... some part of the research budget without any reservation.

  9. Adoption of Integrated Pest Management among Cocoa Farmers in ...

    African Journals Online (AJOL)

    E M IGBOKWE

    Keywords: Integrated pest management, Cocoa farmers, Farmers Field School ... Total World production has increased in absolute terms from 3.98 million metric ..... and G.C. Rausser, eds Handbook of Agricultural Economics, Vol. 1B,.

  10. Integrating distributed Bayesian inference and reinforcement learning for sensor management

    NARCIS (Netherlands)

    Grappiolo, C.; Whiteson, S.; Pavlin, G.; Bakker, B.

    2009-01-01

    This paper introduces a sensor management approach that integrates distributed Bayesian inference (DBI) and reinforcement learning (RL). DBI is implemented using distributed perception networks (DPNs), a multiagent approach to performing efficient inference, while RL is used to automatically

  11. Some aspects of integrated coastal zone management in India

    Digital Repository Service at National Institute of Oceanography (India)

    Untawale, A.G.

    . This trend has created tremendous pressures and the ecological balance is disturbing. There are various factors which are degrading the coastal waters. The Integrated Coastal Management is relatively a recent concept, which involves multidisciplinary approach...

  12. Sensor Area Network for Integrated Systems Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition of every element in a complex System...

  13. Integration of structural health monitoring and asset management.

    Science.gov (United States)

    2012-08-01

    This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...

  14. Chip Integrated, Hybrid EHD/Capillary Driven Thermal Management System

    Data.gov (United States)

    National Aeronautics and Space Administration — Chip-Integrated, Hybrid EHD/Capillary-Driven Thermal Management System is a two year that will leverage independently attained yet related prototype hardware...

  15. In-flight Integrated Mission Management System (I-LIMMS)

    National Research Council Canada - National Science Library

    Emmitt, George D; Greco, Steven; Wood, Sidney

    2006-01-01

    The goal of this Phase I SBIR effort was to determine the feasibility and preliminary design of I-LIMMS, an In-flight Lidar Integrated Mission Management System for the processing and visualization...

  16. Sensor Area Network for Integrated Systems Health Management, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a...

  17. Privacy Impact Assessment for the Integrated Grants Management System

    Science.gov (United States)

    The Integrated Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data is collected, how it will be used, access to the data, the purpose of data collection, and record retention policies.

  18. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  19. Development and improvement of the integrated system of management

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa Galeevna

    2014-07-01

    Full Text Available Integrated management system construction can be considered a way that transforms using business processes and information resources into final construction products. Autonomous system of quality management, environmental, health and safety organizations introduction usually lead to the accumulation of duplicate documents, which increase the time spent on processing and analysis as well as increase the financial costs of maintaining the operation of each of them separately. System integration allows reducing these costs and entailing the most obvious benefits: reduced volumes of documents; reduction of time spent on analysis; reducing the cost of audit and certification; involvement of all the employees of the organization; productivity growth; increasing the attractiveness for consumers; reducing the burden on administrative and executive devices; ensuring a high level of flexibility in the organization's management system in case of internal and external changes. Integration of quality management systems, environmental management and safety management systems, production and safety led to the possibility to establish such integrated management system in developing building companies, which allows establishing a unified management system, as an element of management of organization. The main drawback of the currently used standards and specifications is the lack of flexibility of their application, as well as the basic principles and approaches to their implementation. Thus, knowing about what the system should be, but not knowing how to create it, many organizations have to operate without methodological support. Absence of mandatory standards concerning integration of management systems creates opportunities for the existence of multiple options for interaction systems. Economic effects on the integrated management system is formed from three sources: the reduction of production costs by improving product quality and reducing defects and

  20. Integrated Structural Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) proposes to advance the state of the art in composite health management through refinement of an existing technology developed...

  1. Integrated sign management system : ADOT maintenance group

    Science.gov (United States)

    2003-12-01

    The Arizona Department of Transportation (ADOT) maintains and manages an inventory of roadway signs. Before the implementation of this project, sign technicians maintained inventory records on individual laptops to track their daily sign maintenance ...

  2. The integration of environmental management standards in ...

    African Journals Online (AJOL)

    Research in Hospitality Management is co-published by NISC (Pty) Ltd and Routledge, .... over a total of 12 categories that can all fit the concept of ... Purchasing strategies and reducing consumption ..... In this case there are three options: 1.

  3. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  4. Integrated Vegetation Management Practices Memorandum of Understanding

    Science.gov (United States)

    Memorandum of Understanding between EPA and the Edison Electric Institute, U.S. Department of Agriculture (Forest Service), and U.S. Department of the Interior (Bureau of Land Management, Fish and Wildlife Service, and National Park Service for IVM.

  5. Smallholder integrated crop management (ICM) research planning ...

    African Journals Online (AJOL)

    Mo

    More women farmers were invited because they do most of the farming. Other participants came from ... smallholders to innovate their land and crop management strategies. This would be ..... Asian Farming Systems Association, 2 (2): 67.

  6. An integration architecture for knowledge management system and business process management system

    NARCIS (Netherlands)

    Jung, J.; Choi, I.; Song, M.S.

    2007-01-01

    Recently, interests in the notion of process-oriented knowledge management (PKM) from academia and industry have been significantly increased. Comprehensive research and development requirements along with a cogent framework, however, have not been proposed for integrating knowledge management (KM)

  7. Management systems for high reliability organizations. Integration and effectiveness; Managementsysteme fuer Hochzuverlaessigkeitsorganisationen. Integration und Wirksamkeit

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Michael

    2015-03-09

    The scope of the thesis is the development of a method for improvement of efficient integrated management systems for high reliability organizations (HRO). A comprehensive analysis of severe accident prevention is performed. Severe accident management, mitigation measures and business continuity management are not included. High reliability organizations are complex and potentially dynamic organization forms that can be inherently dangerous like nuclear power plants, offshore platforms, chemical facilities, large ships or large aircrafts. A recursive generic management system model (RGM) was development based on the following factors: systemic and cybernetic Asepcts; integration of different management fields, high decision quality, integration of efficient methods of safety and risk analysis, integration of human reliability aspects, effectiveness evaluation and improvement.

  8. Structural Integrity Management for Fixed Offshore Platforms in Malaysia

    OpenAIRE

    Narayanan Sambu Potty; Mohammad Kabir B. Mohd Akram

    2009-01-01

    Structural Integrity Management (SIM) is important for the protection of offshore crew, environment, business assets and company and industry reputation. API RP 2A contained guidelines for assessment of existing platforms mostly for the Gulf of Mexico (GOM). ISO 19902 SIM framework also does not specifically cater for Malaysia. There are about 200 platforms in Malaysia with 90 exceeding their design life. The Petronas Carigali Sdn Bhd (PCSB) uses the Asset Integrity Management ...

  9. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  10. Integrated management systems: survey results from Portuguese companies and experts

    OpenAIRE

    Domingues, Pedro; Sampaio, Paulo; Arezes, P.

    2012-01-01

    The proliferation of several certifiable sub-systems among different type of organizations lead companies to excessive departmentalization. This fact turned out to be, due to several reasons pointed out by numerous authors, disadvantageous. Hence, organizations optioned by integration of their management sub-systems. Academic awareness to this sociological event is mainly related with the fact of integration of management systems (IMS) had been performed empirically, that is, by each organiza...

  11. The tortoise shell Integrated Coastal Management in Galapagos

    OpenAIRE

    Polit Arguello, Victor Manuel

    2013-01-01

    The current work aims to examine the legal framework for Integrated Coastal Management for Archipelago de Galapagos. It examines the content of ICM at the internal level in order to find if there is a standard for appropriate Integrated Management of Coastal Zones. Also it aims to define whether the ratification of UNCLOS by the government of Ecuador should affect the implementation of such framework.

  12. Understanding Organizational Memory from the Integrated Management Systems (ERP)

    OpenAIRE

    Gilberto Perez; Isabel Ramos

    2013-01-01

    With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP), we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP) we tried to draw a parallel between ...

  13. DESIGN OF INFORMATION MANAGEMENT SYSTEM OF VERTICALLY INTEGRATED AGRICULTURAL HOLDINGS

    Directory of Open Access Journals (Sweden)

    Александр Витальевич ШМАТКО

    2015-05-01

    Full Text Available The paper deals with an approach to the design and development of information systems for the management and optimization of the organizational structure of vertically integrated agricultural holdings. A review of the problems of building and improving the organizational structure of vertically integrated agricultural holding is made. A method of constructing a discrete model management structure agricultural holding, which minimizes the costs associated with attracting applicants to work, is proposed.

  14. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    Science.gov (United States)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  15. Maintaining control while delegating trust: Integrity constraints in trust management

    NARCIS (Netherlands)

    Etalle, S.; Winsborough, W.H.

    2009-01-01

    We introduce the use, monitoring, and enforcement of integrity constraints in trust management-style authorization systems. We consider what portions of the policy state must be monitored to detect violations of integrity constraints. Then, we address the fact that not all participants in a

  16. Integrated Pest Management of the Southern Pine Beetle

    Science.gov (United States)

    Robert N. Coulson; Hannu Saarenmaa

    2011-01-01

    Integrated pest management (IPM) is the maintenance of destructive agents, including insects, at tolerable levels by the planned use of a variety of preventive, suppressive, or regulatory tactics and strategies that are ecologically and economically efficient and socially and politically acceptable. It is explicit that the actions taken are fully integrated into the...

  17. Implementing Integrated Multicultural Instructional Design in Management Education

    Science.gov (United States)

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  18. Integrating Social Science and Ecosystem Management: A National Challenge

    Science.gov (United States)

    Cordell; H. Ken; Linda Caldwell

    1995-01-01

    These proceedings contain the contributed papers and panel presentations, as well as a paper presented at the National Workshop, of the Conference on Integrating Social Sciences and Ecosystem Management, which was held at Unicoi Lodge and Conference Center, Helen, GA, December 12-14, 1995. The overall purpose of this Conference was to improve understanding, integration...

  19. Integrating an Information Literacy Quiz into the Learning Management System

    Science.gov (United States)

    Lowe, M. Sara; Booth, Char; Tagge, Natalie; Stone, Sean

    2014-01-01

    The Claremont Colleges Library Instruction Services Department developed a quiz that could be integrated into the consortial learning management software to accompany a local online, open-source information literacy tutorial. The quiz is integrated into individual course pages, allowing students to receive a grade for completion and improving…

  20. Management Ethics: Integrity at Work. Sage Series on Business Ethics.

    Science.gov (United States)

    Petrick, Joseph A.; Quinn, John F.

    This book tries to redefine what it means for a manager to function with integrity and competence in the private and public sectors domestically and globally. It integrates theoretical work in both descriptive and normative ethics and incorporates legal, communication, quality, and organizational theories into a conceptual framework designed to…

  1. Thermal Management in Fine-Grained 3-D Integrated Circuits

    OpenAIRE

    Iqbal, Md Arif; Macha, Naveen Kumar; Danesh, Wafi; Hossain, Sehtab; Rahman, Mostafizur

    2018-01-01

    For beyond 2-D CMOS logic, various 3-D integration approaches specially transistor based 3-D integrations such as monolithic 3-D [1], Skybridge [2], SN3D [3] holds most promise. However, such 3D architectures within small form factor increase hotspots and demand careful consideration of thermal management at all levels of integration [4] as stacked transistors are detached from the substrate (i.e., heat sink). Traditional system level approaches such as liquid cooling [5], heat spreader [6], ...

  2. Integrated model for line balancing with workstation inventory management

    OpenAIRE

    Dilip Roy; Debdip khan

    2010-01-01

    In this paper, we address the optimization of an integrated line balancing process with workstation inventory management. While doing so, we have studied the interconnection between line balancing and its conversion process. Almost each and every moderate to large manufacturing industry depends on a long and integrated supply chain, consisting of inbound logistic, conversion process and outbound logistic. In this sense an approach addresses a very general problem of integrated line balancing....

  3. Mapping mountain torrent hazards in the Hexi Corridor using an evidential reasoning approach

    Science.gov (United States)

    Ran, Youhua; Liu, Jinpeng; Tian, Feng; Wang, Dekai

    2017-02-01

    The Hexi Corridor is an important part of the Silk Road Economic Belt and a crucial channel for westward development in China. Many important national engineering projects pass through the corridor, such as highways, railways, and the West-to-East Gas Pipeline. The frequent torrent disasters greatly impact the security of infrastructure and human safety. In this study, an evidential reasoning approach based on Dempster-Shafer theory is proposed for mapping mountain torrent hazards in the Hexi Corridor. A torrent hazard map for the Hexi Corridor was generated by integrating the driving factors of mountain torrent disasters including precipitation, terrain, flow concentration processes, and the vegetation fraction. The results show that the capability of the proposed method is satisfactory. The torrent hazard map shows that there is high potential torrent hazard in the central and southeastern Hexi Corridor. The results are useful for engineering planning support and resource protection in the Hexi Corridor. Further efforts are discussed for improving torrent hazard mapping and prediction.

  4. Integrated Management of Residential Energy Resources

    Directory of Open Access Journals (Sweden)

    Antunes C. H.

    2012-10-01

    Full Text Available The increasing deployment of distributed generation systems based on renewables in the residential sector, the development of information and communication technologies and the expected evolution of traditional power systems towards smart grids are inducing changes in the passive role of end-users, namely with stimuli to change residential demand patterns. The residential user should be able to make decisions and efficiently manage his energy resources by taking advantages from his flexibility in load usage with the aim to minimize the electricity bill without depreciating the quality of energy services provided. The aim of this paper is characterizing electricity consumption in the residential sector and categorizing the different loads according to their typical usage, working cycles, technical constraints and possible degree of control. This categorization of end-use loads contributes to ascertain the availability of controllable loads to be managed as well as the different direct management actions that can be implemented. The ability to implement different management actions over diverse end-use load will increase the responsiveness of demand and potentially raises the willingness of end-users to accept such activities. The impacts on the aggregated national demand of large-scale dissemination of management systems that would help the end-user to make decisions regarding electricity consumption are predicted using a simulator that generates the aggregated residential sector electricity consumption under variable prices.

  5. Integrating technologies for effective knowledge management

    Energy Technology Data Exchange (ETDEWEB)

    Beaugrand, F.S.; Curtis, T.A. [Public Petroleum Data Model, PPDM Association, Calgary, AB (Canada)

    2002-06-01

    In order to succeed in today's business environment, effective knowledge management strategies are needed along with effective tools to solve real business problems. Relational databases provide accessible and practical tools that can be used to manage corporate knowledge assets. However, technology is growing so rapidly that it is difficult and too expensive for individual corporations to pursue each line of development independently. Collaborative efforts are needed to improve access to shared knowledge. The PPDM Association is an international not for profit standards body that is working collaboratively with the petroleum exploration and production industry to develop standards for managing data and knowledge, spatially enabling data, standardizing data content and data exchange. The PPDM Association provides a vendor-neutral environment for development, technical support and a methodology for designing, developing and publishing technical deliverables.

  6. Nuclear safety culture and integrated risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.; Orvis, D.D.

    1993-01-01

    A primary focus of nuclear safety is the prevention of large releases of radioactivity in the case of low-probability severe accidents. An analysis of the anatomy of nuclear (Chernobyl, Three Mile Island Unit 2) and nonnuclear (Challenger, Bhopal, Piper Alpha, etc.) severe accidents yields four broad categories of root causes: human (operating crew response), machine (design with its basic flaws), media (natural phenomena, operational considerations, political environment, commercial pressures, etc.)-providing triggering events, and management (basic organizational safety culture flaws). A strong management can minimize the contributions of humans, machines, and media to the risk arising from the operation of hazardous facilities. One way that management can have a powerful positive influence is through the establishment of a proper safety culture. The term safety culture is used as defined by the International Atomic Energy Agency's International Safety Advisory Group

  7. Managed care, vertical integration strategies and hospital performance.

    Science.gov (United States)

    Wang, B B; Wan, T T; Clement, J; Begun, J

    2001-09-01

    The purpose of this study is to examine the association of managed care with hospital vertical integration strategies, as well as to observe the relationships of different types of vertical integration with hospital efficiency and financial performance. The sample consists of 363 California short-term acute care hospitals in 1994. Linear structure equation modeling is used to test six hypotheses derived from the strategic adaptation model. Several organizational and market factors are controlled statistically. Results suggest that managed care is a driving force for hospital vertical integration. In terms of performance, hospitals that are integrated with physician groups and provide outpatient services (backward integration) have better operating margins, returns on assets, and net cash flows (p < 0.01). These hospitals are not, however, likely to show greater productivity. Forward integration with a long-term-care facility, on the other hand, is positively and significantly related to hospital productivity (p < 0.001). Forward integration is negatively related to financial performance (p < 0.05), however, opposite to the direction hypothesized. Health executives should be responsive to the growth of managed care in their local market and should probably consider providing more backward integrated services rather than forward integrated services in order to improve the hospital's financial performance in today's competitive health care market.

  8. Corridor Length and Patch Colonization by a Butterfly Junonia coenia

    Energy Technology Data Exchange (ETDEWEB)

    Nick Haddad

    2000-06-01

    Habitat corridors have been proposed to reduce patch isolation and increase population persistence in fragmented landscapes. This study tested whether patch colonization was increased by the presence and various length corridors. The specific butterfly species tested has been shown to use corridors, however, the results indicate that neither the distance between patches or the presence of a corridor influenced colonization.

  9. Freight corridor performance measurement system: A framework for South Africa

    Directory of Open Access Journals (Sweden)

    Jan H. Havenga

    2016-11-01

    Full Text Available Background: On a national level, South Africa’s freight logistics industry is inefficient. The country ranks 36th out of 40 countries in terms of transport productivity (tonne kilometres as a ratio of gross domestic product, or GDP; the ratio of freight logistics costs to GDP measured 11.1% in 2013, compared to that of developed regions which measures in the order of 9%; and rail tonne-km market share on the two most dense long-distance corridors, namely, GautengDurban and Gauteng-Cape Town, is only 12.8% and 4.4%, respectively, whereas rail is globally acknowledged as a more efficient provider of long-distance freight solutions, given appropriate investments and service commitments. Objectives: A cornerstone of improved national freight logistics performance is the availability of reliable indicators to quantify the efficiency and capacity of the logistics network over the intermediate and long term, thereby enabling an evidence-based policy and investment environment. The objective of this article is to describe the foundation framework (i.e. phase 1 for South Africa’s freight corridor performance measurement system (CPMS. Once populated, the CPMS will be a key generator of indicators to facilitate the systemic management of corridors as a national production factor and thereby contributing to South Africa’s competitiveness. Method: The design of South Africa’s CPMS was informed by desktop research and refined through an extensive stakeholder consultation process. A distinction was made between South Africa’s dedicated bulk corridors and the multi-modal corridors. Results: Facilitating both stakeholder involvement and agreement on key indicators, as well as the eventual development of a system supporting the population, aggregation and dissemination of the CPMS are critical outcomes for the management of corridors as a national production factor. Three overarching corridor indicators were defined, relating to increased throughput

  10. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  11. Barriers to Asthma Management for School Nurses: An Integrative Review

    Science.gov (United States)

    Hanley Nadeau, Ellen; Toronto, Coleen E.

    2016-01-01

    Childhood asthma is a growing health concern. Asthma is the most common chronic illness of childhood and a leading cause of emergency room visits, hospitalizations, and school absenteeism. School nurses play a valuable role in asthma management. The purpose of this integrative review is to examine barriers to asthma management for school nurses in…

  12. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  13. From Knowledge Theory to Management Practice: Towards an Integrated Approach.

    Science.gov (United States)

    Shin, Minsoo; Holden, Tony; Schmidt, Ruth A.

    2001-01-01

    Critically contrasts the three main schools of thought on knowledge and assesses the resulting implications for knowledge management. Presents a conceptual model to integrate theoretical and practical themes to serve as a framework for developing a future research agenda for the development of knowledge management business tools and applications.…

  14. Challenges of Integrated Pest Management in Sub-Saharan Africa

    NARCIS (Netherlands)

    Huis, van A.

    2009-01-01

    a response to the negative side effects of chemical control in the developed world, Integrated Pest Management (IPM) developed with an emphasis on reducing the role of pesticides. Later the role of natural enemies was recognized as being the cornerstone for sustainable pest management strategies.

  15. Integrating the traditional and the modern conflict management ...

    African Journals Online (AJOL)

    The study examines the modalities for integrating traditional and modern conflict management strategies in Nigeria using an analysis of relevant documents as well as Black's Social Control Theory and Thomas-Kilmann's Model of Conflict Management. The successful amalgamation of diverse groups has radically shifted ...

  16. Integration of Women into Management Positions: A Research Review.

    Science.gov (United States)

    Terborg, James R.

    This paper reviews the literature on the psychological and social processes involved in the integration of women into management positions. The author concentrates on two areas. First is the entry of women into management (including women's career choices, choice of organization, and the effects of these choices on the organization. These effects…

  17. Multidisciplinary management--an opportunity for service integration.

    Science.gov (United States)

    Cameron, M

    1997-01-01

    The management team of the future will enter an environment requiring facilitation, participation, clinical, and empowerment skills. Those individuals who possess a clinical orientation as well as business expertise will be sought to manage multidisciplinary units. The rapid changes in the health-care environment have forced organizations to restructure their operations. To achieve quality care, customer satisfaction, cost-effectiveness, and efficiency, service integration across the organization will be required. As we approach the 21st century, this standard will evolve until "all levels are managing patient care." Some of the restructuring trends occurring in the health-care industry have been collaboration service integration, management consolidation, and job elimination. The emphasis for the multidisciplinary manager of the future will include integrating the professional and clinical services, managing information, building community partnerships, promoting physician collaboration, and managing the change process. A model organization in the next century will move toward a people-oriented system with inclusion and empowerment initiatives. Service integration will affect all organizations, but the disciplines within the Clinical Support System will be the most affected. Future opportunities of leadership will exist for pathologists, nurses, or medical technologists as the professional silos of managers and clinicians continue to crumble.

  18. Supply Chain Management and Sustainability : Procrastinating Integration in Mainstream Research

    NARCIS (Netherlands)

    De Brito, M.P.; Van der Laan, E.A.

    2010-01-01

    Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management

  19. Development and Implementation of Integrated Pest Management in ...

    African Journals Online (AJOL)

    Nafiisah

    This paper reviews the status of Integrated Pest Management (IPM) research in. Mauritius and also reports on the successful cases of IPM implementation during ... Tool. Activity. Status. Source. Biological control. Introduce parasitoids .... 10 g sugar in 1 L of water) in plastic bottles as one option to manage fruit flies in.

  20. The integration of quality management functions within a university ...

    African Journals Online (AJOL)

    According to a recent study, institutions of higher learning in South Africa fail to a great extent to integrate the key management functions that are fundamental to effective quality management. This article argues that the effective promotion of quality of a university's core business depends to a large extent on the ability of an ...

  1. A review of Integrated Management of Childhood Illness (IMCI ...

    African Journals Online (AJOL)

    The Integrated Management of Childhood Illness (IMCI) strategy is the primary child-care approach of choice for South Africa.1,2 IMCI training was introduced into ... by nurse practitioner and doctor alike in empowering them to make easy, evidence-based decisions in the management of sick children at first contact level.

  2. The Integrative University: Why University Management Is Different

    Science.gov (United States)

    Temple, Paul

    2008-01-01

    Managing universities "is" different from managing in most other sorts of organisation. In this article, the author shows why this claim is more than just special pleading, and how it relates to the particular form of the organisation. Appreciating their integrative aspects helps people to understand some of the difficulties that they regularly…

  3. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 13 MAY 2015 2...Threat to our National Economy DOD Cybersecurity Gaps Could Be Canary in Federal Acquisition Coal Mine Intangible Assets Create Vulnerabilities...operational approach integrates with current or planned CONOPS, BCP, information architecture, programs or initiatives Development  Approach to

  4. Integrating Total Quality Management (TQM) and hazardous waste management

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Nancy [Colorado State Univ., Fort Collins, CO (United States)

    1993-11-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ``cradle to grave`` management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ``front-end`` treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ``mixed waste`` at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components.

  5. Integrating Total Quality Management (TQM) and hazardous waste management

    International Nuclear Information System (INIS)

    Kirk, N.

    1993-01-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ''cradle to grave'' management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ''front-end'' treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ''mixed waste'' at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components

  6. Development of integrated accident management assessment technology

    International Nuclear Information System (INIS)

    Jung, Won Dea; Ha, Jae Joo; Jin, Young Ho

    2002-04-01

    This project aims to develop critical technologies for accident management through securing evaluation frameworks and supporting tools, in order to enhance capabilities coping with severe accidents. For the research goal, firstly under the viewpoint of accident prevention, on-line risk monitoring system and the analysis framework for human error have been developed. Secondly, the training/supporting systems including the training simulator and the off-site risk evaluation system have been developed to enhance capabilities coping with severe accidents. Four kinds of research results have been obtained from this project. Firstly, the framework and taxonomy for human error analysis has been developed for accident management. As the second, the supporting system for accident managements has been developed. Using data that are obtained through the evaluation of off-site risk for Younggwang site, the risk database as well as the methodology for optimizing emergency responses has been constructed. As the third, a training support system, SAMAT, has been developed, which can be used as a training simulator for severe accident management. Finally, on-line risk monitoring system, DynaRM, has been developed for Ulchin 3 and 4 unit

  7. Integrated management of thesis using clustering method

    Science.gov (United States)

    Astuti, Indah Fitri; Cahyadi, Dedy

    2017-02-01

    Thesis is one of major requirements for student in pursuing their bachelor degree. In fact, finishing the thesis involves a long process including consultation, writing manuscript, conducting the chosen method, seminar scheduling, searching for references, and appraisal process by the board of mentors and examiners. Unfortunately, most of students find it hard to match all the lecturers' free time to sit together in a seminar room in order to examine the thesis. Therefore, seminar scheduling process should be on the top of priority to be solved. Manual mechanism for this task no longer fulfills the need. People in campus including students, staffs, and lecturers demand a system in which all the stakeholders can interact each other and manage the thesis process without conflicting their timetable. A branch of computer science named Management Information System (MIS) could be a breakthrough in dealing with thesis management. This research conduct a method called clustering to distinguish certain categories using mathematics formulas. A system then be developed along with the method to create a well-managed tool in providing some main facilities such as seminar scheduling, consultation and review process, thesis approval, assessment process, and also a reliable database of thesis. The database plays an important role in present and future purposes.

  8. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  9. Management of Uncertain Data - towards unattended integration

    NARCIS (Netherlands)

    de Keijzer, Ander

    2008-01-01

    In recent years, the need to support uncertain data has increased. Sensor applications, for example, are dealing with the inherent uncertainty about the readings of the sensors. Current database management systems are not equipped to deal with this uncertainty, other than as a user defined

  10. Steam generator asset management: integrating technology and asset management

    International Nuclear Information System (INIS)

    Shoemaker, P.; Cislo, D.

    2006-01-01

    Asset Management is an established but often misunderstood discipline that is gaining momentum within the nuclear generation industry. The global impetus behind the movement toward asset management is sustainability. The discipline of asset management is based upon three fundamental aspects; key performance indicators (KPI), activity-based cost accounting, and cost benefits/risk analysis. The technology associated with these three aspects is fairly well-developed, in all but the most critical area; cost benefits/risk analysis. There are software programs that calculate, trend, and display key-performance indicators to ensure high-level visibility. Activity-based costing is a little more difficult; requiring a consensus on the definition of what comprises an activity and then adjusting cost accounting systems to track. In the United States, the Nuclear Energy Institute's Standard Nuclear Process Model (SNPM) serves as the basis for activity-based costing. As a result, the software industry has quickly adapted to develop tracking systems that include the SNPM structure. Both the KPI's and the activity-based cost accounting feed the cost benefits/risk analysis to allow for continuous improvement and task optimization; the goal of asset management. In the case where the benefits and risks are clearly understood and defined, there has been much progress in applying technology for continuous improvement. Within the nuclear generation industry, more specialized and unique software systems have been developed for active components, such as pumps and motors. Active components lend themselves well to the application of asset management techniques because failure rates can be established, which serves as the basis to quantify risk in the cost-benefits/risk analysis. A key issue with respect to asset management technologies is only now being understood and addressed, that is how to manage passive components. Passive components, such as nuclear steam generators, reactor vessels

  11. Multiple sclerosis care: an integrated disease-management model.

    Science.gov (United States)

    Burks, J

    1998-04-01

    A disease-management model must be integrated, comprehensive, individual patient focused and outcome driven. In addition to high quality care, the successful model must reduce variations in care and costs. MS specialists need to be intimately involved in the long-term care of MS patients, while not neglecting primary care issues. A nurse care manager is the "glue" between the managed care company, health care providers and the patient/family. Disease management focuses on education and prevention, and can be cost effective as well as patient specific. To implement a successful program, managed care companies and health care providers must work together.

  12. "INTEGRATED QUALITY MANAGEMENT" AS A SUBJECT IN HIGHER EDUCATION CURRICULUM

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2007-03-01

    Full Text Available The importance of introduction of "Integrated quality management" into higher education curricula arises from the need for students to grasp synergetic application of new and advanced approaches to theoretical and practical management quality and process based management in particular as well as understanding a unified concept which improves conformity and linking of all levels in management hierarchy (normative, strategic and operational toward accomplishment of successful business performance. A curriculum is proposed (as a contribution to a map of necessary knowledge to be expected from prospective quality personnel with appropriate topics in accordance with studies objective and chosen up-to-date options of management concepts and methods.

  13. Managing the physics of the economics of integrated health care.

    Science.gov (United States)

    Zismer, Daniel K; Werner, Mark J

    2012-01-01

    The physics metaphor, as applied to the economics (and financial performance) of the integrated health system, seems appropriate when considered together with the nine principles of management framework provided. The nature of the integrated design enhances leaders' management potential as they consider organizational operations and strategy in the markets ahead. One question begged by this argument for the integrated design is the durability, efficiency and ultimate long-term survivability of the more "traditional" community health care delivery models, which, by design, are fragmented, internally competitive and less capital efficient. They also cannot exploit the leverage of teams, optimal access management or the pursuit of revenues made available in many forms. For those who wish to move from the traditional to the more integrated community health system designs (especially those who have not yet started the journey), the path requires: * Sufficient balance sheet capacity to fund the integration process-especially as the model requires physician practice acquisitions and electronic health record implementations * A well-prepared board13, 14 * A functional, durable and sustainable physician services enterprise design * A redesigned organizational and governance structure * Favorable internal financial incentives alignment design * Effective accountable physician leadership * Awareness that the system is not solely a funding strategy for acquired physicians, rather a fully -.. committed clinical and business model, one in which patient-centered integrated care is the core service (and not acute care hospital-based services) A willingness to create and exploit the implied and inherent potential of an integrated design and unified brand Last, it's important to remember that an integrated health system is a tool that creates a "new potential" (a physics metaphor reference, one last time). The design doesn't operate itself. Application of the management principles

  14. Clarifying the Imperative of Integration Research for Sustainable Environmental Management

    Directory of Open Access Journals (Sweden)

    Stephen Dovers

    2005-01-01

    Full Text Available This paper discusses why integration is important in doing research for developing policy and practice of sustainable environmental management. The imperative of integration includes environmental, social, economic, and other disciplinary considerations, as well as stakeholder interests. However, what is meant by integration is not always clear. While the imperative is being increasingly enunciated, the challenges it presents are difficult and indicate a long term pursuit. This paper clarifies the different dimensions of integration, as an important preliminary step toward advancing mutual understanding and the development of approaches. The paper identifies the driving forces for integration, discusses when integration is required, categorises forms of integration, and proposes principles to inform research programs and projects.

  15. Integrating total quality management in a library setting

    CERN Document Server

    Jurow, Susan

    2013-01-01

    Improve the delivery of library services by implementing total quality management (TQM), a system of continuous improvement employing participative management and centered on the needs of customers. Although TQM was originally designed for and successfully applied in business and manufacturing settings, this groundbreaking volume introduces strategies for translating TQM principles from the profit-based manufacturing sector to the library setting. Integrating Total Quality Management in a Library Setting shows librarians how to improve library services by implementing strategies such as employ

  16. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  17. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  18. Integrated flexible capacity and inventory management under flexible capacity uncertainty

    OpenAIRE

    Paç, Mehmet Fazıl

    2006-01-01

    Cataloged from PDF version of article. In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study we consider the integrated management of inventory and flexible capacity management under seasonal stochastic demand and uncertain labor supply. The capacity planning problem is investigated from the workforce planning perspective. We consider a manufactu...

  19. INTEGRATION MECHANISMS OF IMPROVEMENT OF HUMAN RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vera A. Akimenko

    2013-01-01

    Full Text Available In the current economic conditions, the efficiency of business processes of an organization is determined by the quality of the staff. Therefore, actual is the creation and application of new approaches to the management of human re-sources. The article presents a comparative analysis of management practices and their impact on the effectiveness of personnel management, the mechanism of their integration to improve the efficiency of the process.

  20. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  1. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  2. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  3. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  4. Integrated information and logistics management, quality management and firm performance of pork processing industry in China

    NARCIS (Netherlands)

    Han, J.; Trienekens, J.H.; Omta, S.W.F.

    2009-01-01

    Purpose – This paper seeks to discuss the interactions amongst integrated information technology (IT), integrated logistics management, quality management practices and firm performance of pork processors in China. Design/methodology/approach – A conceptual framework was developed by examining the

  5. Integrated remotely sensed datasets for disaster management

    OpenAIRE

    McCarthy, Tim; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-01-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North...

  6. Integral management of hazardous materials transport

    International Nuclear Information System (INIS)

    Moran, M.

    2002-01-01

    As a result of outsourcing transport operations and complementary services on the part of the producers and shippers, there is a growing demand for global services that integrate the whole external logistics value chain, the latter being understood to signify the process that includes the storage, transport (monomodal or bi-multi-modal) and delivery to destination. This circumstance has obliged transport firms to undertake a process of internal transformation: from offering an activity purely of transport to becoming logistics operators. Express Truck, S. a. (hereinafter ETSA) could not ignore this market requirement. We will explain the evolutionary process of ETSA in this sense. (Author)

  7. Integrated Data Management for Mobile Services in the Real World

    DEFF Research Database (Denmark)

    Hage, C.; Jensen, Christian Søndergaard; Pedersen, Torben Bach

    2003-01-01

    Market research companies predict a huge market for services to be delivered to mobile users. Services in5 clude route guidance, point-of-interest search, metering services such as road pricing and parking payment, traffic monitoring, etc. We believe that no single such service will be the killer...... service, but that suites of integrated services are called for. Such integrated services reuse integrated content obtained from multiple content providers. This paper describes concepts and techniques underlying the data management system deployed by a Danish mobile content integrator. While geo...

  8. Fracture corridors as seal-bypass systems in siliciclastic reservoir-cap rock successions: Field-based insights from the Jurassic Entrada Formation (SE Utah, USA)

    NARCIS (Netherlands)

    Ogata, Kei; Senger, Kim; Braathen, Alvar; Tveranger, Jan

    2014-01-01

    Closely spaced, sub-parallel fracture networks contained within localized tabular zones that are fracture corridors may compromise top seal integrity and form pathways for vertical fluid flow between reservoirs at different stratigraphic levels. This geometry is exemplified by fracture corridors

  9. Improving integration for integrated coastal zone management: an eight country study.

    Science.gov (United States)

    Portman, M E; Esteves, L S; Le, X Q; Khan, A Z

    2012-11-15

    Integrated coastal zone management (ICZM) is a widely accepted approach for sustainable management of the coastal environment. ICZM emphasizes integration across sectors, levels of government, uses, stakeholders, and spatial and temporal scales. While improving integration is central to progress in ICZM, the role of and the achievement of integration remain understudied. To further study these two points, our research analyzes the performance of specific mechanisms used to support ICZM in eight countries (Belgium, India, Israel, Italy, Portugal, Sweden, UK, and Vietnam). The assessment is based on a qualitative comparative analysis conducted through the use of two surveys. It focuses on five ICZM mechanisms (environmental impact assessment; planning hierarchy; setback lines; marine spatial planning, and regulatory commission) and their role in improving integration. Our findings indicate that certain mechanisms enhance specific types of integration more effectively than others. Environmental impact assessment enhances science-policy integration and can be useful to integrate knowledge across sectors. Planning hierarchy and regulatory commissions are effective mechanisms to integrate policies across government levels, with the latter also promoting public-government integration. Setback lines can be applied to enhance integration across landscape units. Marine spatial planning is a multi-faceted mechanism with the potential to promote all types of integration. Policy-makers should adopt the mechanisms that are suited to the type of integration needed. Results of this study also contribute to evidence-based coastal management by identifying the most common impediments related to the mechanisms of integration in the eight studied countries. Copyright © 2012 Elsevier B.V. All rights reserved.

  10. Economic corridor of industrial development in Indonesia

    Science.gov (United States)

    Berawi, M. A.; Miraj, P.; Sidqi, H.

    2017-12-01

    Indonesia as an archipelago country categorize its regional development into six corridors from Sumatra, Java, Kalimantan, Sulawesi, Bali-Nusa Tenggara and Papua-Maluku. Currently, industrial development becomes one of the highest contributing factors to the national economic growth. However, each region in the nation experience inequality of development mainly related to the infrastructure sector. Thus, the research aims to develop a sustainable economic corridor by considering the characteristics and its potential. The research uses a qualitative approach through a desk study, benchmarking and in-depth interview. Location Quotient is used for the method of the analysis tool. The results show each characteristic of every corridor in the country. Sumatera as national plantation and processing industry corridor, Java as cyber technology innovation and services center, Kalimantan as national energy reserves and processing, Sulawesi as national aquaculture and processing industry, Bali - Nusa Tenggara as national eco-tourism center, and Papua - Maluku as national ore mining and processing.

  11. Regional Ecological Corridors - MLCCS derived 2008

    Data.gov (United States)

    Minnesota Department of Natural Resources — Identification of potential ecological corridors between the MLCCS derived ecological patches (ear_eco08py3). This was generated using cost / distance analysis,...

  12. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  13. Effects of top management involvement in integrated marketing communications

    Directory of Open Access Journals (Sweden)

    Nina Hočevar

    2007-12-01

    Full Text Available There is scarce empirical evidence in the academic literature of how top management involvement influences the degree of integrated marketing communications. At the same time, some authors believe that this relationship should be explored more extensively.In this paper we present one possible approach to investigating the relationship between top management involvement and the degree of integrated marketing communications. Our research established that a greater involvement of top management in marketing communications could be associated with a higher degree of IMC. Investigating the relationship between management and IMC is indeed at a very early stage. We suggest that this study has provided a basis for future research on the relationship between top management involvement in marketing communications and the degree of IMC.

  14. Integrating risk management into the baselining process

    International Nuclear Information System (INIS)

    Jennett, N.; Tonkinson, A.

    1994-01-01

    These processes work together in building the project (comprised of the technical, schedule, and cost baselines) against which performance is measured and changes to the scope, schedule and cost of a project are managed and controlled. Risk analysis is often performed as the final element of the scheduling or estimating processes, a precursor to establishing cost and schedule contingency. However, best business practices dictate that information that may be crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable. The purpose or risk management is not to eliminate risk. Neither is it intended to suggest wholesale re-estimating and re-scheduling of a project. Rather, the intent is to make provisions to reduce and control the schedule and/or cost ramifications of risk by anticipating events and conditions that cannot be reliably planned for and which have the potential to negatively impact accomplishment of the technical objectives and requirements of the project

  15. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  16. A Review of Ocean Management and Integrated Resource Management Programs from Around the World

    OpenAIRE

    , Seaplan

    2018-01-01

    This draft report is one of several prepared under contract to the Massachusetts Ocean Partnership (MOP) to support the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) in its development of the integrated coastal ocean management plan mandated by the Massachusetts Oceans Act of 2008. The purpose of this report was to inventory and review ocean management and integrated resource management programs from around the world, including the United States, Europe, Australia...

  17. Role of plant pathology in integrated pest management.

    Science.gov (United States)

    Jacobsen, B J

    1997-01-01

    Integrated Pest Management (IPM) is a paradigm that is widely adopted by all pest control disciplines but whose early definitions and philosophical basis belong to entomologists. Plant pathology research and extension work has historically emphasized integration of several control strategies and fits both historical and modern definitions of IPM. While the term IPM has been used only sparingly in the phytopathology literature, the integrated disease management strategies emphasized are now considered to be at the forefront of ecologically based or biointensive pest management. While IPM is broadly endorsed by crop protection disciplines, farmers, other agriculturalists, and consumers, the potential for Integrated Pest Management has not been fully realized. Most IPM programs reflect a package of tools and decision aids for individual crop insect, weed, nematode, and plant disease management. IPM programs that integrate all types of pests with the agroecosystem, crop growth and loss models still await the formation of interdisciplinary teams focusing on growers needs. Lack of funding for both discipline and interdisciplinary developmental research and implementation is responsible for the paucity of comprehensive IPM programs for the majority of the U.S. crop acreage. This review explores the origins and evolution of the IPM paradigm and reviews efforts to achieve the body of knowledge and implementation structure to achieve IPM's full potential.

  18. Toward population management in an integrated care model.

    Science.gov (United States)

    Maddux, Franklin W; McMurray, Stephen; Nissenson, Allen R

    2013-01-01

    Under the Patient Protection and Affordable Care Act of 2010, accountable care organizations (ACOs) will be the primary mechanism for achieving the dual goals of high-quality patient care at managed per capita costs. To achieve these goals in the newly emerging health care environment, the nephrology community must plan for and direct integrated delivery and coordination of renal care, focusing on population management. Even though the ESRD patient population is a complex group with comorbid conditions that may confound integration of care, the nephrology community has unique experience providing integrated care through ACO-like programs. Specifically, the recent ESRD Management Demonstration Project sponsored by the Centers for Medicare & Medicaid Services and the current ESRD Prospective Payment System with it Quality Incentive Program have demonstrated that integrated delivery of renal care can be accomplished in a manner that provides improved clinical outcomes with some financial margin of savings. Moving forward, integrated renal care will probably be linked to provider performance and quality outcomes measures, and clinical integration initiatives will share several common elements, namely performance-based payment models, coordination of communication via health care information technology, and development of best practices for care coordination and resource utilization. Integration initiatives must be designed to be measured and evaluated, and, consistent with principles of continuous quality improvement, each initiative will provide for iterative improvements of the initiative. © 2013 S. Karger AG, Basel.

  19. A SURVEY ON INDIAN EXPERIENCE ON INTEGRATED MANAGEMENT STANDARDS (IMS

    Directory of Open Access Journals (Sweden)

    H. Khanna

    2009-09-01

    Full Text Available Adoption of management systems standards is a key issue in manufacturing industry in India. Following the global trend quality and environmental issues are gaining importance. However the number of ISO 14001 certified companies are much less in India as compared to ISO 9001. The integration of ISO 14001 with ISO 9001 may help companies to sustain competitive advantage and overcome disappointments with quality standards and in turn encourage companies to adopt good environmental practices. The aim of this research is to study the implementation of integrated management standards (IMS by the manufacturing organizations in India. The different aspects of integration and benefits of IMS implementation are analyzed. This r esearch is based on empirical study carried out in Indian manufacturing firms, involving the application of a questionnaire. This questionnaire was tested on 50 manufacturing companies in India. The study reveals that focus on stakeholders; top management commitment and training are critical success factors for implementation of IMS. The main benefits of integration are discussed. The small sample size is one of the major limitations of this study. The paper informs the managers in manufacturing organizations and practitioners of management system standards especially in developing countries about IMS and will enable them to adopt IMS in future so that those organizations may not implement multiple and overlapping MSS(Management System Standards.

  20. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  1. The teaching of nursing management in undergraduate: an integrative review

    Directory of Open Access Journals (Sweden)

    Mara Solange Gomes Dellaroza

    2015-03-01

    Full Text Available The study aims to identify the dynamics of teaching management in nursing degree. It is an integrative literature review with research conducted in the following online database platforms: SciELO, Medline, Lilacs and BDENF. The keywords used in the study were: competency-based education, professional competence, education, nursing, organization and administration, management, nursing, educational assessment, organization of management services, management of professional practice and education. All articles published in the last 10 years which answered the question presented to approach the teaching of nursing management in Brazil, published in any language were included. Those that were not presented in full text were excluded. Of the 1432 studies identified after matching the keywords, only 8 were selected for answering objective of this review. From these results, three related themes emerged: the teaching plans, workload and program content; methodologies of teaching and learning in nursing management; challenges faced in developing the teaching of nursing management.

  2. Integrated forest management to prevent wildfires under Mediterranean environments

    Directory of Open Access Journals (Sweden)

    Piermaria Corona

    2015-02-01

    Full Text Available This review presents a multidisciplinary framework for integrating the ecological, regulatory, procedural and technical aspects of forest management for fires prevention under Mediterranean environments. The aims are to: i provide a foreground of wildfire scenario; ii illustrate the theoretical background of forest fuel management; iii describe the available fuel management techniques and mechanical operations for fire prevention in forest and wildland-urban interfaces, with exemplification of case-studies; iv allocate fire prevention activities under the hierarchy of forest planning. The review is conceived as an outline commentary discussion targeted to professionals, technicians and government personnel involved in forestry and environmental management.

  3. River corridor science: Hydrologic exchange and ecological consequences from bedforms to basins

    Science.gov (United States)

    Harvey, Judson; Gooseff, Michael

    2015-01-01

    Previously regarded as the passive drains of watersheds, over the past 50 years, rivers have progressively been recognized as being actively connected with off-channel environments. These connections prolong physical storage and enhance reactive processing to alter water chemistry and downstream transport of materials and energy. Here we propose river corridor science as a concept that integrates downstream transport with lateral and vertical exchange across interfaces. Thus, the river corridor, rather than the wetted river channel itself, is an increasingly common unit of study. Main channel exchange with recirculating marginal waters, hyporheic exchange, bank storage, and overbank flow onto floodplains are all included under a broad continuum of interactions known as “hydrologic exchange flows.” Hydrologists, geomorphologists, geochemists, and aquatic and terrestrial ecologists are cooperating in studies that reveal the dynamic interactions among hydrologic exchange flows and consequences for water quality improvement, modulation of river metabolism, habitat provision for vegetation, fish, and wildlife, and other valued ecosystem services. The need for better integration of science and management is keenly felt, from testing effectiveness of stream restoration and riparian buffers all the way to reevaluating the definition of the waters of the United States to clarify the regulatory authority under the Clean Water Act. A major challenge for scientists is linking the small-scale physical drivers with their larger-scale fluvial and geomorphic context and ecological consequences. Although the fine scales of field and laboratory studies are best suited to identifying the fundamental physical and biological processes, that understanding must be successfully linked to cumulative effects at watershed to regional and continental scales.

  4. Intellectual capital management as the integral part of enterprise’s management

    OpenAIRE

    Аліна Олександрівна Осаул

    2016-01-01

    The main levels of the enterprise’s intellectual capital management are analyzed in the article. The distinctive peculiarities of the enterprise’s intellectual capital management are mentioned. Goals and benefits of the intellectual management system are determined. The ways of their improvement are pointed out. Implicit and explicit knowledge as an important integral intellectual capital resources are divided and characterized

  5. Integrating fire management into land management planning for west-side forests

    Science.gov (United States)

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  6. Total Quality Management and Organizational Behavior Management: An Integration for Continual Improvement.

    Science.gov (United States)

    Mawhinney, Thomas C.

    1992-01-01

    The history and main features of organizational behavior management (OBM) are compared and integrated with those of total quality management (TQM), with emphasis on W.E. Deming's 14 points and OBM's operant-based approach to performance management. Interventions combining OBM, TQM, and statistical process control are recommended. (DB)

  7. Asset management: integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-06-01

    Two new multi-dimensional databases, which expand the `row and column` concept of spreadsheets into multiple categories of data called dimensions, are described. These integrated software packages provide the foundation for industry players such as Poco Petroleum Ltd and Numac Energy Inc to gain a competitive advantage, by overhauling their respective data collection and retrieval systems to allow for timely cost analysis and financial reporting. Energy Warehouse, an on-line analytical processing product marketed by SysGold Ltd, is one of the software products described. It gathers various sources of information, allows advanced searches and generates reports previously unavailable in other conventional financial accounting systems. The second product discussed - the Canadian Upstream Energy System (CUES) - is an on-line analytical processing system developed by Oracle Corporation and Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server and software development tools with ATS`s upstream financial, land, geotechnical and production applications. The software also allows for optimization of facilities, analysis of production efficiencies and comparison of performance against industry standards.

  8. SYSTEMS FOR IMPROVEMENT OF BUSINESS INTEGRATED MANAGEMENT PROCESSES IN PORTS

    Directory of Open Access Journals (Sweden)

    Pavle Popovic

    2017-03-01

    Full Text Available Based on test results obtained so far, the objective relating to modern scientific methods and approaches has been defined with the intention to develop model which defines new management system integration model, by adopting necessary practical terms of real systems that most frequently circulate in maritime practice in the field of integrated management systems (IMS in terms of safety and security of vessels and ports. The subject of research is maritime, particularly port services, by way of defining internal and external advantages through adopting integrated management systems. The research will be conducted through theoretical and applied assessments of case study analyses using example of the Port of Kotor H.Co.

  9. THE MANAGEMENT ACCOUNTING TOOLS AND THE INTEGRATED REPORTING

    Directory of Open Access Journals (Sweden)

    Gabriel JINGA

    2015-04-01

    Full Text Available During the recent years the stakeholders are asking for other pieces of information to be published along with the financial one, such as risk reporting, intangibles, social and environmental accounting. The type of corporate reporting which incorporates the elements enumerated above is the integrated reporting. In this article, we argue that the information disclosed in the integrated reports is prepared by the management accounting, not only by the financial accounting. Thus, we search for the management accounting tools which are used by the companies which prepare integrated reports. In order to do this, we analytically reviewed all the reports available on the website of a selected company. Our results show that the company is using most of the management accounting tools mentioned in the literature review part.

  10. Managing Key Risks in Post-Merger IS Integration

    DEFF Research Database (Denmark)

    Alaranta, Mar; Mathiassen, L

    2014-01-01

    Mergers and acquisitions (M&A) require organizations to blend together different information system (IS) configurations. Unfortunately, less than 50 percent of M&A's achieve their goals, with IS integration being a major problem. Here, the authors offer a framework to help managers prepare for......, analyze, and mitigate risks during post-merger IS integration. They identify key risks relating to IS integration content, process, and context, and present five strategies for mitigating those risks. Their framework aims to help managers proactively reduce the impact of adverse events. Adopting...... the framework supported by their templates is straightforward and the time and resources required are minimal. When properly executed, adoption increases the likelihood of successful merger outcomes; the framework is thus a valuable addition to the management tool box and can be applied in collaboration...

  11. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  12. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  13. RIVER CORRIDOR BUILDINGS 324 and 327 CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.; SMITH, B.A.

    2006-01-01

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D and D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km 2 (1 mi 2 )300 Area comprises only a small part of the 1517 km 2 (586 mi 2 ) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D and D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building

  14. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  15. Integrating environment health and safety management at Petro-Canada

    International Nuclear Information System (INIS)

    Raymond, G.

    1993-01-01

    Petro-Canada has developed a tool to integrate, measure, and improve its management systems of environment, health, and safety (EH ampersand S). This tool, called the Total Loss Management System, is described in the areas of general management issues, policies and procedures, evaluations, organization, stewardship, issue management, and performance measures. Petro-Canada's policies on occupational health and safety are consistent with its environmental policy, being structured in the same way. An integrated audit system is used to cover health, safety, industrial hygiene, reliability, environment, and risk management. EH ampersand S matters are integrated at the corporate level in a separate department. Regional divisions review EH ampersand S performance every month, incidents are discussed, and preventive measures are taken as necessary. Regional performances are combined every quarter for ultimate presentation to the Petro-Canada board. New or emerging issues that may affect divisions are assigned an issue sponsor, a member of divisional management who makes sure the issue receives the resources necessary to study and define its impact. Examples of issues include soil contamination, process hazard management, and benzene exposure limits. Performance measures flow from the corporate environment and occupational health and safety policies, and come in two types: those that measure activities to improve performance and those that measure the outcome of the activities

  16. Integrated risk management for business survival

    International Nuclear Information System (INIS)

    Piatt, J.A.

    1992-06-01

    During the recent recession, many businesses have had to take severe measures to cut costs. The Department of Defense has also been faced with the need to cut costs to offset the expense of the Gulf War and a shrinking budget due to the fall of communism around the world. With the collapse of the Warsaw Pact and dissolution of the Soviet Union, there has been an increasing demand to reduce the defense budget to provide the so-called ''peace dividend'' to deal with social and economic problems at home. President Bush's State of the Union Message in February 1992 called for deeper cuts than the 25% previously anticipated. It also called for these cuts to occur sooner than expected with $50 billion in defense cuts anticipated over the fiscal 1992--1997 period. The Department of Defense plan for force resizing calls for 25-30% reductions over time. This report discusses how the department of defense is trying to deal with the management of this crisis

  17. Integration of Biosafety into Core Facility Management

    Science.gov (United States)

    Fontes, Benjamin

    2013-01-01

    This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core laboratory for biosafety professionals. Elevating awareness of biohazards and the biosafety regulatory landscape among core facility operators is essential for the establishment of a framework for both project and material risk assessment. The goal of the biohazard risk assessment process is to identify the biohazard risk management parameters to conduct the procedure safely and in compliance with applicable regulations. An evaluation of the containment, protective equipment and work practices for the procedure for the level of risk identified is facilitated by the establishment of a core facility registration form for work with biohazards and other biological materials with potential risk. The final step in the biocontainment process is the assumption of Principal Investigator role with full responsibility for the structure of the site-specific biosafety program plan by core facility leadership. The presentation will provide example biohazard protocol reviews and accompanying containment measures for core laboratories at Yale University.

  18. Commercial Aircraft Integrated Vehicle Health Management Study

    Science.gov (United States)

    Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon Monica; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.; Thomas, Megan A.

    2010-01-01

    Statistical data and literature from academia, industry, and other government agencies were reviewed and analyzed to establish requirements for fixture work in detection, diagnosis, prognosis, and mitigation for IVHM related hardware and software. Around 15 to 20 percent of commercial aircraft accidents between 1988 and 2003 involved inalftfnctions or failures of some aircraft system or component. Engine and landing gear failures/malfunctions dominate both accidents and incidents. The IVI vl Project research technologies were found to map to the Joint Planning and Development Office's National Research and Development Plan (RDP) as well as the Safety Working Group's National Aviation Safety Strategic. Plan (NASSP). Future directions in Aviation Technology as related to IVHlvl were identified by reviewing papers from three conferences across a five year time span. A total of twenty-one trend groups in propulsion, aeronautics and aircraft categories were compiled. Current and ftiture directions of IVHM related technologies were gathered and classified according to eight categories: measurement and inspection, sensors, sensor management, detection, component and subsystem monitoring, diagnosis, prognosis, and mitigation.

  19. Integrated risk management for business survival

    Energy Technology Data Exchange (ETDEWEB)

    Piatt, J.A.

    1992-06-01

    During the recent recession, many businesses have had to take severe measures to cut costs. The Department of Defense has also been faced with the need to cut costs to offset the expense of the Gulf War and a shrinking budget due to the fall of communism around the world. With the collapse of the Warsaw Pact and dissolution of the Soviet Union, there has been an increasing demand to reduce the defense budget to provide the so-called peace dividend'' to deal with social and economic problems at home. President Bush's State of the Union Message in February 1992 called for deeper cuts than the 25% previously anticipated. It also called for these cuts to occur sooner than expected with $50 billion in defense cuts anticipated over the fiscal 1992--1997 period. The Department of Defense plan for force resizing calls for 25-30% reductions over time. This report discusses how the department of defense is trying to deal with the management of this crisis.

  20. Integrated risk management for business survival

    Energy Technology Data Exchange (ETDEWEB)

    Piatt, J.A.

    1992-06-01

    During the recent recession, many businesses have had to take severe measures to cut costs. The Department of Defense has also been faced with the need to cut costs to offset the expense of the Gulf War and a shrinking budget due to the fall of communism around the world. With the collapse of the Warsaw Pact and dissolution of the Soviet Union, there has been an increasing demand to reduce the defense budget to provide the so-called ``peace dividend`` to deal with social and economic problems at home. President Bush`s State of the Union Message in February 1992 called for deeper cuts than the 25% previously anticipated. It also called for these cuts to occur sooner than expected with $50 billion in defense cuts anticipated over the fiscal 1992--1997 period. The Department of Defense plan for force resizing calls for 25-30% reductions over time. This report discusses how the department of defense is trying to deal with the management of this crisis.

  1. Regional Integrated Silvopastoral Approaches to Ecosystem Management Project

    OpenAIRE

    CIPAV (Centre For Research on Sustainable Agricultural Production Systems); CATIE (Centro Agronomico Tropical de Investigacion y Ensenanza); NITLAPAN

    2007-01-01

    Metadata only record The Regional Integrated Silvopastoral Approaches to Ecosystem Management Project introduces the payment for environmental services approach to silvopastoral farmers in Colombia, Costa Rica, and Nicaragua. The objectives of the project are to "demonstrate and measure a) the effects the introduction of payment incentives for environmental services to farmers on their adoption of integrated silvopastoral farming systems in degraded pasture lands; and b) the resulting impr...

  2. Science of Integrated Approaches to Natural Resources Management

    Science.gov (United States)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and

  3. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  4. Integrating Environmental and Information Systems Management: An Enterprise Architecture Approach

    Science.gov (United States)

    Noran, Ovidiu

    Environmental responsibility is fast becoming an important aspect of strategic management as the reality of climate change settles in and relevant regulations are expected to tighten significantly in the near future. Many businesses react to this challenge by implementing environmental reporting and management systems. However, the environmental initiative is often not properly integrated in the overall business strategy and its information system (IS) and as a result the management does not have timely access to (appropriately aggregated) environmental information. This chapter argues for the benefit of integrating the environmental management (EM) project into the ongoing enterprise architecture (EA) initiative present in all successful companies. This is done by demonstrating how a reference architecture framework and a meta-methodology using EA artefacts can be used to co-design the EM system, the organisation and its IS in order to achieve a much needed synergy.

  5. Integrated tracking, classification, and sensor management theory and applications

    CERN Document Server

    Krishnamurthy, Vikram; Vo, Ba-Ngu

    2012-01-01

    A unique guide to the state of the art of tracking, classification, and sensor management. This book addresses the tremendous progress made over the last few decades in algorithm development and mathematical analysis for filtering, multi-target multi-sensor tracking, sensor management and control, and target classification. It provides for the first time an integrated treatment of these advanced topics, complete with careful mathematical formulation, clear description of the theory, and real-world applications. Written by experts in the field, Integrated Tracking, Classification, and Sensor Management provides readers with easy access to key Bayesian modeling and filtering methods, multi-target tracking approaches, target classification procedures, and large scale sensor management problem-solving techniques.

  6. China-Pakistan Economic Corridor.

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, Tucker [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    International trade and related economic activities in Central and South Asia are increasing as developing economies, particularly India and Pakistan, grow. China continues to emerge as a major regional and global power and has embarked upon numerous regional economic and political initiatives . A major development is the China - Pakistan Economic Corridor (CPEC), a host of infrastructure and trade projects worth over 40 billion American dollars . This report analyzes CPEC a nd its potential regional effects, including the trade security implications of the port and land infrastructure developments . As trade increase s in the reg ion and the major CPEC infrastructure projects are completed, there will be numerous implications on trade security and geopolitics within South Asia. CPEC projects uniquely intersect numerous regional situations, including territorial disputes in Kashmir, the Afghanistan/Pakistan border, and Chinese foreign policy a mbitions. A nuanced understanding of these effects can influence future policy adjustments in this region . The views expressed in this report are those of the author and do not necessarily reflect the position of Sandia National Laboratories or the author's current and past institutions.

  7. Integrated Management System – Scope, Possibilities And Methodology

    Directory of Open Access Journals (Sweden)

    Čekanová Katarína

    2015-06-01

    Full Text Available Organizations are becoming more aware of the importance of integrated management systems (IMS. Interest in this subject indicates that IMS are seen as “management systems of the future”. Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  8. Technology and diabetes self-management: An integrative review

    OpenAIRE

    Hunt, Caralise W

    2015-01-01

    Technology can be used to supplement healthcare provider diabetes care by providing both educational and motivational support. Education can be provided using technology allowing patients to learn new practices and routines related to diabetes management. Technology can support daily diabetes self-management activities including blood glucose monitoring, exercising, healthy eating, taking medication, monitoring for complications, and problem-solving. This article describes an integrative revi...

  9. ACCOUNTANT'S WARNING REGARDING THE LACK OF MANAGEMENT INTEGRITY

    Directory of Open Access Journals (Sweden)

    SORIN ADRIAN ACHIM

    2011-04-01

    Full Text Available This article highlights the challenges faced by accountants when they find that the integrity of company management is poor. The main problem is in relation with the accountants’ fear, mostly: suffering some repercussions from the disclosure of such information. Also, this article aims to emphasize the danger brought by covering and concealing incriminating information against the management; but also, how accountants could expose this information in such a way that they would not suffer, under no circumstances from such disclosures.

  10. Integration mockup and process material management system

    Science.gov (United States)

    Verble, Adas James, Jr.

    1992-01-01

    Work to define and develop a full scale Space Station Freedom (SSF) mockup with the flexibility to evolve into future designs, to validate techniques for maintenance and logistics and verify human task allocations and support trade studies is described. This work began in early 1985 and ended in August, 1991. The mockups are presently being used at MSFC in Building 4755 as a technology and design testbed, as well as for public display. Micro Craft also began work on the Process Material Management System (PMMS) under this contract. The PMMS simulator was a sealed enclosure for testing to identify liquids, gaseous, particulate samples, and specimen including, urine, waste water, condensate, hazardous gases, surrogate gasses, liquids, and solids. The SSF would require many trade studies to validate techniques for maintenance and logistics and verify system task allocations; it was necessary to develop a full scale mockup which would be representative of current SSF design with the ease of changing those designs as the SSF design evolved and changed. The tasks defined for Micro Craft were to provide the personnel, services, tools, and materials for the SSF mockup which would consist of four modules, nodes, interior components, and part task mockups of MSFC responsible engineering systems. This included the Engineering Control and Life Support Systems (ECLSS) testbed. For the initial study, the mockups were low fidelity, soft mockups of graphics art bottle, and other low cost materials, which evolved into higher fidelity mockups as the R&D design evolved, by modifying or rebuilding, an important cost saving factor in the design process. We designed, fabricated, and maintained the full size mockup shells and support stands. The shells consisted of cylinders, end cones, rings, longerons, docking ports, crew airlocks, and windows. The ECLSS required a heavier cylinder to support the ECLSS systems test program. Details of this activity will be covered. Support stands were

  11. A system and approach for total pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd; Neidhardt, Dietmar [Tuboscope Pipeline Services, Houston, TX (United States); Gonzalez, Oscar [Tuboscope Mexico S.A. de C.V., Mexico, D.F. (Mexico)

    2005-07-01

    Pipeline rehabilitation and maintenance decisions are made using a wide variety of data, criteria, and expertise. The goal is to arrive at an optimal plan that considers risk and best return on Repair and Maintenance (R and M) expenditures for aging pipeline systems in both regulated and non-regulated environments. In order to achieve these goals, historical, operations, and assessment data is gathered, aligned and integrated as part of a baseline assessment. Integrity threats are identified based on operations and industry experience, and combined with potential consequences to public safety, the environment, and business to clearly delineate high risk exposure segments in the system. Integrity assessments are conducted in a prioritized manner, using the most appropriate technology and methods to address the threats. These include In Line Inspection technologies: MFL, Deformation, UT, INS (combinations thereof), Direct Assessment for EC and SCC threats, Hydro testing, and other indirect methods. From these results, decisions are made and R and M plans developed. To arrive at an optimal R and M plan, proper use of existing data, new integrity assessment data, and decision risk models is required. This paper presentation will detail the tactical aspect of an effective integrity management platform. Experience in decision support, operations priorities and execution of a rehabilitation plan using LinaView Pro{sup TM} integrity management system with risk-based integrity tools and maintenance planning will be presented. A process overview, results, and benefits will be given using these examples from operating oil and gas transmission pipelines. (author)

  12. Effects of Integrated Health Management Intervention on Overweight and Obesity

    Directory of Open Access Journals (Sweden)

    Yiting Yang

    2017-01-01

    Full Text Available Overweight or obese adults aged 20~55 years and living in Beijing more than one year were randomly divided into different management groups. A one-year integrated health management intervention was applied in the health management groups. The physical indicators and metabolic indicators changed after one-year intervention on the overweight and obese adults. The annual reduction of the physical indicators was significant in all groups (p<0.05 except the weight loss in the placebo + general management group. The health management and the dietary supplement have statistically significant (p<0.001, p<0.001 effects on the annual reduction of these indicators and interactive effect between them was found on some of these indicators such as bodyweight, body mass index (BMI, body fat ratio (BFR, and hipline (p<0.05. The dietary supplement + health management group had the best annual reduction effects for the indicators among the groups. Integrated health management interventions including both dietary supplements intervention and health management could improve metabolic indicators in overweight and obese adults together with the physical indicators, suggesting the intermediated role of metabolic indictors in controlling obesity.

  13. Integrated software system for low level waste management

    International Nuclear Information System (INIS)

    Worku, G.

    1995-01-01

    In the continually changing and uncertain world of low level waste management, many generators in the US are faced with the prospect of having to store their waste on site for the indefinite future. This consequently increases the set of tasks performed by the generators in the areas of packaging, characterizing, classifying, screening (if a set of acceptance criteria applies), and managing the inventory for the duration of onsite storage. When disposal sites become available, it is expected that the work will require re-evaluating the waste packages, including possible re-processing, re-packaging, or re-classifying in preparation for shipment for disposal under the regulatory requirements of the time. In this day and age, when there is wide use of computers and computer literacy is at high levels, an important waste management tool would be an integrated software system that aids waste management personnel in conducting these tasks quickly and accurately. It has become evident that such an integrated radwaste management software system offers great benefits to radwaste generators both in the US and other countries. This paper discusses one such approach to integrated radwaste management utilizing some globally accepted radiological assessment software applications

  14. Continuous improvement of the BNFL transport integrated management system

    International Nuclear Information System (INIS)

    Hale, J.A.

    1998-01-01

    The integrated Management System of BNFL Transport and Pacific Nuclear Transport Limited (PNTL) is subject to continuous improvement by the application of established improvement techniques adopted by BNFL. The technique currently being used is the application of a Total Quality Management (TQM) philosophy, involving the identification of key processes, benchmarking against existing measures, initiating various improvement projects and applying process changes within the Company. The measurement technique being used is based upon the European Foundation for Quality Management Model (EFQM). A major initiative was started in 1996 to include the requirements of the Environmental Management Systems standard ISO 14001 within the existing integrated management system. This resulted in additional activities added to the system, modification to some existing activities and additional training for personnel. The system was audited by a third party certification organisation, Lloyds Register Quality Assurance (LRQA), during 1997. This paper describes the arrangements to review and update the integrated management system of BNFL Transport and PNTL to include the requirements of the environmental standard ISO 14001 and it also discusses the continuous improvement process adopted by BNFL Transport. (authors)

  15. Nuclear power plant Angra integrated enterprise management system

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2009-01-01

    The characteristics and peculiarities of the Nuclear Power Plant ANGRA 3 enterprise, amongst which its technical complexity, the size of the project and of the supplies of goods and services contracted for for the Brazilian and foreign scopes, the variety of contractors and participants involved in the implementation, associated with the need of integrated management of all the activities of the enterprise, requires the setting of standardized criteria and procedures to be adopted by the enterprise Project Management Team and by all involved ELETRONUCLEAR (ETN) Units, Suppliers and Contractors for Brazilian and foreign goods and services for the execution of the activities related to overall enterprise planning. These criteria and procedures aim at covering the five Project Management Process Groups: Initiating Process Group, Planning Process Group, Execution Process Group, Monitoring and Controlling Process Group and Closing Process Group. For the ANGRA 3 enterprise, ETN developed the Integrated Enterprise Management System - INTEGRA, being the software 'Primavera Enterprise Project Management' a fundamental part of this system. The aim of this paper is to describe the main concepts involving the ANGRA 3 enterprise management, and the integration between the processes, including all disciplines in all phases of the enterprise life cycle, such as: Nuclear and Environmental Licensing, Infrastructure, National and Foreign Engineering, National and Import Supplies, Civil Works, Electromechanical Erection, Commissioning. (author)

  16. INNOVATION DEVELOPMENT MANAGEMENT IN VERTICALLY INTEGRATED HOLDING COMPANY

    Directory of Open Access Journals (Sweden)

    Natalya T. Uspenskaja

    2015-01-01

    Full Text Available The trend towards production consolidation and integration processes taking place both in the Russian and global economies leads to development of business associations, with a holding company being the most common form inRussiaand around the globe. The evidence in favor of the formation of holding companies is that they can benefit from the scale (bulk purchasing, centralized stuff training; in the global capital and exports markets they can be more effective than smaller businesses and, if non-profitable, a loss-making structure is easier to liquidate than the entire company; holding companies and associations can be an effective defender from political interference. As the importance of the well-functioning and harmonized procedure for the companies’ integration will increase (especially in the context of Russian business, where specific features of many areas of the production system imply the use of holding oligopolies as the most effective form of market structures, there is a need in their more profound study and, in particular, in the analysis of the most important technologies of the general integration procedure. The article outlines the relevance of innovative development management of vertically integrated holding systems, lists principles of innovative activity management and considers the features of innovation management of a vertically integrated holding company. The objective of the research is to study theoretical and practical aspects of innovative development management in vertically integrated holding systems. The object of research is management structures in innovative holding companies. While working on the article, the following methods of economic research were used: abstract and logical method, empirical method, method of expert evaluations, as well as methods of structural and functional and statistical analysis. 

  17. Integrating science and resource management in Tampa Bay, Florida

    Science.gov (United States)

    Yates, Kimberly K.; Greening, Holly; Morrison, Gerold

    2011-01-01

    Tampa Bay is recognized internationally for its remarkable progress towards recovery since it was pronounced "dead" in the late 1970s. Due to significant efforts by local governments, industries and private citizens throughout the watershed, water clarity in Tampa Bay is now equal to what it was in 1950, when population in the watershed was less than one-quarter of what it is today. Seagrass extent has increased by more than 8,000 acres since the mid-1980s, and fish and wildlife populations are increasing. Central to this successful turn-around has been the Tampa Bay resource management community's long-term commitment to development and implementation of strong science-based management strategies. Research institutions and agencies, including Eckerd College, the Florida Wildlife Commission Fish and Wildlife Research Institute, Mote Marine Laboratory, National Oceanic and Atmospheric Administration, the Southwest Florida Water Management District, University of South Florida, U.S. Environmental Protection Agency, U.S. Geological Survey, local and State governments, and private companies contribute significantly to the scientific basis of our understanding of Tampa Bay's structure and ecological function. Resource management agencies, including the Tampa Bay Regional Planning Council's Agency on Bay Management, the Southwest Florida Water Management District's Surface Water Improvement and Management Program, and the Tampa Bay Estuary Program, depend upon this scientific basis to develop and implement regional adaptive management programs. The importance of integrating science with management has become fully recognized by scientists and managers throughout the region, State and Nation. Scientific studies conducted in Tampa Bay over the past 10–15 years are increasingly diverse and complex, and resource management programs reflect our increased knowledge of geology, hydrology and hydrodynamics, ecology and restoration techniques. However, a synthesis of this

  18. Integrating environmental monitoring with cumulative effects management and decision making.

    Science.gov (United States)

    Cronmiller, Joshua G; Noble, Bram F

    2018-05-01

    Cumulative effects (CE) monitoring is foundational to emerging regional and watershed CE management frameworks, yet monitoring is often poorly integrated with CE management and decision-making processes. The challenges are largely institutional and organizational, more so than scientific or technical. Calls for improved integration of monitoring with CE management and decision making are not new, but there has been limited research on how best to integrate environmental monitoring programs to ensure credible CE science and to deliver results that respond to the more immediate questions and needs of regulatory decision makers. This paper examines options for the integration of environmental monitoring with CE frameworks. Based on semistructured interviews with practitioners, regulators, and other experts in the Lower Athabasca, Alberta, Canada, 3 approaches to monitoring system design are presented. First, a distributed monitoring system, reflecting the current approach in the Lower Athabasca, where monitoring is delegated to different external programs and organizations; second, a 1-window system in which monitoring is undertaken by a single, in-house agency for the purpose of informing management and regulatory decision making; third, an independent system driven primarily by CE science and understanding causal relationships, with knowledge adopted for decision support where relevant to specific management questions. The strengths and limitations of each approach are presented. A hybrid approach may be optimal-an independent, nongovernment, 1-window model for CE science, monitoring, and information delivery-capitalizing on the strengths of distributed, 1-window, and independent monitoring systems while mitigating their weaknesses. If governments are committed to solving CE problems, they must invest in the long-term science needed to do so; at the same time, if science-based monitoring programs are to be sustainable over the long term, they must be responsive to

  19. Talladega scenic drive corridor management plan

    Science.gov (United States)

    2002-04-01

    The Talladega Scenic Drive is a 29-mile two-laned, paved road, primarily located along the ridges of Horseblock and Cheaha mountains through the Talladega National Forest in northeastern Alabama with panoramic views into Choccolocco and Cheaha Valley...

  20. Large-Scale Habitat Corridors for Biodiversity Conservation: A Forest Corridor in Madagascar.

    Directory of Open Access Journals (Sweden)

    Tanjona Ramiadantsoa

    Full Text Available In biodiversity conservation, habitat corridors are assumed to increase landscape-level connectivity and to enhance the viability of otherwise isolated populations. While the role of corridors is supported by empirical evidence, studies have typically been conducted at small spatial scales. Here, we assess the quality and the functionality of a large 95-km long forest corridor connecting two large national parks (416 and 311 km2 in the southeastern escarpment of Madagascar. We analyze the occurrence of 300 species in 5 taxonomic groups in the parks and in the corridor, and combine high-resolution forest cover data with a simulation model to examine various scenarios of corridor destruction. At present, the corridor contains essentially the same communities as the national parks, reflecting its breadth which on average matches that of the parks. In the simulation model, we consider three types of dispersers: passive dispersers, which settle randomly around the source population; active dispersers, which settle only in favorable habitat; and gap-avoiding active dispersers, which avoid dispersing across non-habitat. Our results suggest that long-distance passive dispersers are most sensitive to ongoing degradation of the corridor, because increasing numbers of propagules are lost outside the forest habitat. For a wide range of dispersal parameters, the national parks are large enough to sustain stable populations until the corridor becomes severely broken, which will happen around 2065 if the current rate of forest loss continues. A significant decrease in gene flow along the corridor is expected after 2040, and this will exacerbate the adverse consequences of isolation. Our results demonstrate that simulation studies assessing the role of habitat corridors should pay close attention to the mode of dispersal and the effects of regional stochasticity.

  1. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  2. Integrated Hydrographical Basin Management. Study Case - Crasna River Basin

    Science.gov (United States)

    Visescu, Mircea; Beilicci, Erika; Beilicci, Robert

    2017-10-01

    Hydrographical basins are important from hydrological, economic and ecological points of view. They receive and channel the runoff from rainfall and snowmelt which, when adequate managed, can provide fresh water necessary for water supply, irrigation, food industry, animal husbandry, hydrotechnical arrangements and recreation. Hydrographical basin planning and management follows the efficient use of available water resources in order to satisfy environmental, economic and social necessities and constraints. This can be facilitated by a decision support system that links hydrological, meteorological, engineering, water quality, agriculture, environmental, and other information in an integrated framework. In the last few decades different modelling tools for resolving problems regarding water quantity and quality were developed, respectively water resources management. Watershed models have been developed to the understanding of water cycle and pollution dynamics, and used to evaluate the impacts of hydrotechnical arrangements and land use management options on water quantity, quality, mitigation measures and possible global changes. Models have been used for planning monitoring network and to develop plans for intervention in case of hydrological disasters: floods, flash floods, drought and pollution. MIKE HYDRO Basin is a multi-purpose, map-centric decision support tool for integrated hydrographical basin analysis, planning and management. MIKE HYDRO Basin is designed for analyzing water sharing issues at international, national and local hydrographical basin level. MIKE HYDRO Basin uses a simplified mathematical representation of the hydrographical basin including the configuration of river and reservoir systems, catchment hydrology and existing and potential water user schemes with their various demands including a rigorous irrigation scheme module. This paper analyzes the importance and principles of integrated hydrographical basin management and develop a case

  3. The integration of intrapreneurship into a performance management model

    Directory of Open Access Journals (Sweden)

    Thabo WL Foba

    2007-02-01

    Full Text Available This study aimed to investigate the feasibility of using the dynamics of intrapreneurship to develop a new generation performance management model based on the structural dynamics of the Balanced Score Card approach. The literature survey covered entrepreneurship, from which the construct, intrapreneurship, was synthesized. Reconstructive logic and Hermeneutic methodology were used in studying the performance management systems and the Balanced Score Card approach. The dynamics were then integrated into a new approach for the management of performance of intrapreneurial employees in the corporate environment. An unstructured opinion survey followed: a sample of intrapreneurship students evaluated and validated the model’s conceptual feasibility and probable practical value.

  4. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  5. An integrative model of knowledge management and team work

    Directory of Open Access Journals (Sweden)

    Juan A. Marin-Garcia

    2008-10-01

    Full Text Available Human Resource Management relevance in Knowledge Management has been studied in academic literature mostly from the point of view of recruitment, selection, wages and salaries and career development processes. We have found few publications that are focused in the behaviour of the group of people who generate, share and transfer that knowledge while working in a team. The aim of this paper is to propose a framework that describes the relation between knowledge management and team work,, integrating Nonaka and Takeuchi, Leonard- Barton and Heisig framework proposals, as well as to outline some reflexions for further researches.

  6. Integrated groundwater management: An overview of concepts and challenges

    Science.gov (United States)

    Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    Managing water is a grand challenge problem and has become one of humanity’s foremost priorities. Surface water resources are typically societally managed and relatively well understood; groundwater resources, however, are often hidden and more difficult to conceptualize. Replenishment rates of groundwater cannot match past and current rates of depletion in many parts of the world. In addition, declining quality of the remaining groundwater commonly cannot support all agricultural, industrial and urban demands and ecosystem functioning, especially in the developed world. In the developing world, it can fail to even meet essential human needs. The issue is: how do we manage this crucial resource in an acceptable way, one that considers the sustainability of the resource for future generations and the socioeconomic and environmental impacts? In many cases this means restoring aquifers of concern to some sustainable equilibrium over a negotiated period of time, and seeking opportunities for better managing groundwater conjunctively with surface water and other resource uses. However, there are many, often-interrelated, dimensions to managing groundwater effectively. Effective groundwater management is underpinned by sound science (biophysical and social) that actively engages the wider community and relevant stakeholders in the decision making process. Generally, an integrated approach will mean “thinking beyond the aquifer”, a view which considers the wider context of surface water links, catchment management and cross-sectoral issues with economics, energy, climate, agriculture and the environment. The aim of the book is to document for the first time the dimensions and requirements of sound integrated groundwater management (IGM). The primary focus is on groundwater management within its system, but integrates linkages beyond the aquifer. The book provides an encompassing synthesis for researchers, practitioners and water resource managers on the concepts and

  7. Improving environmental impact assessmentfor better integrated coastal zone management

    NARCIS (Netherlands)

    Tiwi, D.A.

    2004-01-01

    How to make use of coastal and marine resources in a sustainable manner is an increasing concern among coastal stakeholders all over the world. Integrated Coastal Zone Management (ICZM) is a well-known concept nowadays, but its implementation is often hampered. This is also the case in Indonesia.

  8. Emergence of Integrated Water Resources Management : Measuring implementation in Vietnam

    NARCIS (Netherlands)

    Akkerman, M.; Khanh, N.T.; Witter, M.; Rutten, M.M.

    2015-01-01

    Recently, the changes in laws and regulations, such as the revised Law on Water Resources in 2012, have sought to provide a legal framework for the internationally recognized practices of Integrated Water Resources Management (IWRM) in Vietnam. With IWRM being a novel approach for Vietnam, it would

  9. An Integrated Model for Effective Knowledge Management in Chinese Organizations

    Science.gov (United States)

    An, Xiaomi; Deng, Hepu; Wang, Yiwen; Chao, Lemen

    2013-01-01

    Purpose: The purpose of this paper is to provide organizations in the Chinese cultural context with a conceptual model for an integrated adoption of existing knowledge management (KM) methods and to improve the effectiveness of their KM activities. Design/methodology/approaches: A comparative analysis is conducted between China and the western…

  10. Challenges of communicating integrated water resource management in Zimbabwe

    NARCIS (Netherlands)

    Marimbe, S.; Manzungu, E.

    2003-01-01

    With the promulgation of the 1998 Water Act the Government of Zimbabwe took a decisive step to reform the country's water sector, to bring it in line with contemporary socio-political realities obtaining in the country, and in tune with the philosophy of integrated water resources management.

  11. An Integrated Pest Management Tool for Evaluating Schools

    Science.gov (United States)

    Bennett, Blake; Hurley, Janet; Merchant, Mike

    2016-01-01

    Having the ability to assess pest problems in schools is essential for a successful integrated pest management (IPM) program. However, such expertise can be costly and is not available to all school districts across the United States. The web-based IPM Calculator was developed to address this problem. By answering questions about the condition of…

  12. Building an Integrative Model for Managing Exploratory Innovation

    DEFF Research Database (Denmark)

    Zarmeen, Parisha; Turri, Vanessa Gina; Sanchez, Ron

    2014-01-01

    central problems” organizations face when trying to manage innovation processes (Van de Ven, 1986). We develop an enhanced version of O’Connor’s (2008) Discovery, Incubation and Acceleration (DIA) model by integrating elements of Sanchez’ (2012) theory of architectural isomorphism as well as Markides...

  13. Transgenic plants as vital components of integrated pest management

    NARCIS (Netherlands)

    Kos, Martine; van Loon, J.J.A.; Dicke, M.; Vet, L.E.M.

    2009-01-01

    Although integrated pest management (IPM) strategies have been developed worldwide, further improvement of IPM effectiveness is required. The use of transgenic technology to create insect-resistant plants can offer a solution to the limited availability of highly insect-resistant cultivars.

  14. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  15. Effect of integrated pest management farmer field school (IPMFFS ...

    African Journals Online (AJOL)

    This research aimed to explore the effect of the Integrated Pest Management Farmer Field School (IPMFFS), on farmer knowledge, farmer group's ability, process of adoption and diffusion of IPM in Jember district. The population of the research was 556 farmer groups consisting of 22.240 farmers engaged in the IPMFFS in ...

  16. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    NARCIS (Netherlands)

    M.P. de Brito (Marisa); E.A. van der Laan (Erwin)

    2010-01-01

    textabstractResearch has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations

  17. Software for the occupational health and safety integrated management system

    International Nuclear Information System (INIS)

    Vătăsescu, Mihaela

    2015-01-01

    This paper intends to present the design and the production of a software for the Occupational Health and Safety Integrated Management System with the view to a rapid drawing up of the system documents in the field of occupational health and safety

  18. Optimal control for integrated emission management in diesel engines

    NARCIS (Netherlands)

    Donkers, M.C.F.; van Schijndel, J.; Heemels, W.P.M.H.; Willems, F.

    2017-01-01

    Integrated Emission Management (IEM) is a supervisory control strategy that minimises operational costs (consisting of fuel and AdBlue) for diesel engines with an aftertreatment system, while satisfying emission constraints imposed by legislation. In most work on IEM, a suboptimal heuristic

  19. Optimal control for integrated emission management in diesel engines

    NARCIS (Netherlands)

    Donkers, M.C.F.; Schijndel, J. van; Heemels, W.P.M.H.; Willems, F.P.T.

    2016-01-01

    Integrated Emission Management (IEM) is a supervisory control strategy that minimises operational costs (consisting of fuel and AdBlue) for diesel engines with an aftertreatment system, while satisfying emission constraints imposed by legislation. In most work on IEM, a suboptimal heuristic

  20. Dynamic programming for Integrated Emission Management in diesel engines

    NARCIS (Netherlands)

    Schijndel, J. van; Donkers, M.C.F.; Willems, F.P.T.; Heemels, W.P.M.H.

    2014-01-01

    Integrated Emission Management (IEM) is a supervisory control strategy that aims at minimizing the operational costs of diesel engines with an aftertreatment system, while satisfying emission constraints imposed by legislation. In previous work on IEM, a suboptimal real-time implementable solution