WorldWideScience

Sample records for integrated contingency plan

  1. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  2. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  3. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  4. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  5. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  6. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  7. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  8. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  9. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  10. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  11. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  12. 40 CFR 264.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...

  13. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  14. 40 CFR 265.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  15. 40 CFR 265.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...

  16. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  17. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  18. The Contingent Value of Organizational Integration

    Directory of Open Access Journals (Sweden)

    Virpi Turkulainen

    2013-08-01

    Full Text Available We elaborate the link between organizational design and effectiveness by examining organizational integration and performance in the context of modern manufacturing. Through careful contextualization and empirical analysis of 266 manufacturing organizations in three industries and nine countries, we uncover a joint effect of integration and complexity on organizational effectiveness. The results extend structural contingency theory, in particular the mechanisms that link organizational integration to organizational effectiveness. We conclude by discussing the continuing relevance of structural contingency theory.

  19. Dengue Contingency Planning: From Research to Policy and Practice

    Science.gov (United States)

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak

  20. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  1. 40 CFR 264.227 - Emergency repairs; contingency plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...

  2. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  3. Radiological Contingency Planning for the Mars Science Laboratory Launch

    Energy Technology Data Exchange (ETDEWEB)

    Paul P. Guss

    2008-04-01

    This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Space and Aeronautics and Space Administration (NASA), state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

  4. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  5. 40 CFR 300.210 - Federal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  6. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  7. Contingency planning in southern Africa: Events rather than processes?

    Directory of Open Access Journals (Sweden)

    Elias Mabaso

    2013-09-01

    Full Text Available With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork was used. The findings show that (1 there was a wide gap between theory and practice in contingency planning, (2 response activities rarely reflected projected scenarios and (3 resources were inadequate for effective contingency planning. We conclude that unless these issues are addressed, contingency planning is likely to remain a theoretical rather than a practical tool for building disaster-resilient communities in southern African countries. Although a generalisation cannot be made on the status of contingency planning and practice in southern Africa without a wider analysis of more examples, the findings may apply beyond the examined contexts and also offer insights into research gaps.

  8. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    Science.gov (United States)

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  9. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  10. Volcanic Eruption: Students Develop a Contingency Plan

    Science.gov (United States)

    Meisinger, Philipp; Wittlich, Christian

    2013-04-01

    , causing a blockage and afflux of the Rhine, which, due to the given conditions of a very narrow valley, would lead to excessive flooding affecting even the greater Rhine-Main-region. Not to mention the consequences of a pyroclastic flow, dropping volcanic bombs and further hazardous/disastrous consequences. In comparison to other "potentially active" or "active volcanoes", e.g. the Vesuvius, the Laacher See is scarcely monitored and according to recent publications poorly analyzed in terms of contingency and evacuation plans. This offers space for critical analysis and creative solutions to an existing problem. Short: We need geographers and their knowledge to provide help. Given these facts, the Laacher See could be the layout for a very interesting geography project bringing together previously gained knowledge and understanding of volcanic activities, their destructive powers, consequences and risks in case of an eruption in combination with their topographical characteristics. Your students thereby act the role of a geoscientist developing contingency plans and evacuation zones for the greater Laacher See area. This involves a detailed analysis of the topographical characteristics based on (classic) topographic maps or online via the use of a GIS (e.g. Google maps). In a second step students enlist the possible consequences they already know according to their range and copy them onto a transparency layer on the topographic map. Using such a layer technique students add population density, important topographic features and maybe even anticipated wind directions to their map. The information density and the specific layout of this map are thereby only determined by the student's previous knowledge, their personal abilities and skills and the amount of time provided. This offers the opportunities to even differentiate the task within your group and provide support adjusted to the individual students level. On the basis of their own thematic map your students should be

  11. 40 CFR 267.54 - When must I amend the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...

  12. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  13. Thinking ahead about reproductive health: contingency planning and emergency preparedness in crisis situations (Iraq and West Africa).

    Science.gov (United States)

    DeLargy, Pamela; Alakbarov, Ramiz

    2004-09-01

    The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.

  14. Public education programme for nuclear contingency planning in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.; Li, S. W.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. Cooperation by the public is vital to the effective implementation of any contingency plan. Understanding of the basics of radiation protection as well as the contingency plan will help the public to appreciate the situation and react in a rational manner. A public education program to promote awareness of the contingency plan has been implemented in Hong Kong. In particular, a Virtual Exhibition Hall on radiation has been developed and launched in February 2002 for access by the public via Internet. A video and a set of web pages will be launched in the later part of 2002 to inform and educate the public on matters related to nuclear accident response in Hong Kong. This paper describes the public education programme in Hong Kong to promote public awareness and understanding of the nuclear contingency plan

  15. Implications of Contingency Planning Support for Weather and Icing Information

    Science.gov (United States)

    Vigeant-Langlois, Laurence; Hansman, R. John, Jr.

    2003-01-01

    A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

  16. 40 CFR 267.53 - Who must have copies of the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...

  17. 77 FR 76815 - Handling of Animals; Contingency Plans

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Parts 2 and 3 [Docket No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Final rule. SUMMARY: We are amending the Animal Welfare Act...

  18. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  19. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  20. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  1. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  2. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  3. Contingency planning for nuclear emergencies in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. This plan not only aims to ensure a quick and timely response to mitigate the health impact of any accidental release but also targets to re-assure the public that the territory is not contaminated when appropriate. This paper describes the principal elements of the nuclear contingency plan in Hong Kong, namely, an extensive environmental radiation monitoring programme and a proactive public communication programme

  4. 40 CFR 51.152 - Contingency plans.

    Science.gov (United States)

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency... emission control actions to be taken at each episode stage. (Examples of emission control actions are set...: (1) Prompt acquisition of forecasts of atmospheric stagnation conditions and of updates of such...

  5. 10 CFR 72.186 - Change to physical security and safeguards contingency plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Change to physical security and safeguards contingency... contingency plans. (a) The licensee shall make no change that would decrease the safeguards effectiveness of... licensee safeguards contingency plan without prior approval of the Commission. A licensee desiring to make...

  6. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Science.gov (United States)

    2013-08-28

    ...] Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency Measures for... California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual... Air Act Requirements for Contingency Measures III. Review of the Submitted San Joaquin Valley PM 2.5...

  7. Integrating Structural Health Management with Contingency Control for Wind Turbines

    Directory of Open Access Journals (Sweden)

    Kai Goebel

    2013-01-01

    Full Text Available Maximizing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. In that context, systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage to the turbine. Advanced contingency control is one way to enable autonomous decision-making by providing the mechanism to enable safe and efficient turbine operation. The work reported herein explores the integration of condition monitoring of wind turbine blades with contingency control to balance the trade-offs between maintaining system health and energy capture. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

  8. 75 FR 33747 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-06-15

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Notice of Intent to Delete the soils of Operable Unit 1 and the underlying ground water of the... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Texas...

  9. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  10. 78 FR 73449 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-12-06

    ... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Omaha Lead Superfund Site AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  11. 76 FR 70105 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State... property PINs listed above. The deletion of these two parcels from the Site affects all surface soils...

  12. 76 FR 45483 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Contingency Plan (NCP). The EPA and the State of Texas, through the Texas Commission on Environmental Quality... Notice of Deletion for SMPA Superfund Site without prior Notice of Intent for Deletion because EPA views...

  13. 78 FR 11620 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2013-02-19

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Kerr... Substances Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  14. 78 FR 45905 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-30

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Craig... Substances Pollution Contingency Plan (NCP). The EPA and the Commonwealth of Pennsylvania, through the... Craig Farm Drum Superfund Site without prior Notice of Intent to Delete because we view this as a...

  15. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...

  16. 77 FR 43567 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-07-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort... Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental... Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse comment...

  17. 78 FR 69360 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-19

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial... and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of California... Corp Air Station Superfund Site without prior Notice of Intent for Partial Deletion because EPA views...

  18. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-04-01

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...

  19. 76 FR 50441 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-15

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the New Jersey... Deletion of the Sayreville Landfill Superfund Site without prior Notice of Intent to Delete because we view...

  20. 78 FR 48844 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-12

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Mosley... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Oklahoma... Deletion of the MRSL Superfund Site without prior Notice of Intent to Delete because we view this as a...

  1. 76 FR 20605 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2011-04-13

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the Michigan Department... Delete because we view this as a noncontroversial revision and anticipate no adverse comment. We have...

  2. 76 FR 70057 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Partial Deletion of the...). Refer to Figures 1 to 3 in the deletion docket to view the location of the two parcels being proposed... Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA...

  3. 75 FR 43115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-23

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...

  4. 75 FR 47521 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent...

    Science.gov (United States)

    2010-08-06

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...

  5. 78 FR 47267 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-05

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the State of Oklahoma, through the Oklahoma Department of Environmental... without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  6. 78 FR 66325 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-05

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of South Carolina, through the South... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  7. 78 FR 60809 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of New York, through the New York State... Deletion of the Site without prior Notice of Intent to Delete because EPA views this as a noncontroversial...

  8. 76 FR 51316 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the Commonwealth of Puerto Rico, through the Puerto Rico Environmental... Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  9. 78 FR 44512 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-24

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Sola... Pollution Contingency Plan (NCP). The EPA and the State of California, through the Regional Water Quality...., Inc. Superfund Site without prior Notice of Intent to Delete because we view this as a...

  10. 76 FR 32115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-06-03

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Delaware, through the Delaware... Delete because EPA views this as a noncontroversial revision and anticipates no adverse comment. We have...

  11. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hipps..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... of Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse...

  12. 75 FR 54821 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent...

    Science.gov (United States)

    2010-09-09

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...

  13. 78 FR 45167 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-26

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Cannon... Substances Pollution Contingency Plan (NCP). The EPA and the State of Massachusetts, through the...), Superfund Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision...

  14. 77 FR 67783 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2012-11-14

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Waste... and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the...-Holland Lagoons Superfund Site without prior Notice of Intent to Delete because we view this as a...

  15. 78 FR 60721 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... final Notice of Deletion of the Ludlow Sand & Gravel Superfund Site (Site), located in the Town of Paris..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  16. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  17. Provider integration and local market conditions: a contingency theory perspective.

    Science.gov (United States)

    Young, G J; Parker, V A; Charns, M P

    2001-01-01

    In recent years we have witnessed an expanding array of organizational arrangements for providing health care services in the U.S. These arrangements integrate previously independent providers at one or more points on the continuum of care. The presence of so many of these arrangements raises the question of whether certain types are more effective than are others to help providers adapt to their environment. This article discusses contingency theory as a conceptual lens for guiding empirical studies of the effectiveness of different types of arrangements.

  18. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  19. Oil spill contingency planning in the Ivory coast

    International Nuclear Information System (INIS)

    Bender, K.; Jensen, S.K.; Ostergaerd, J.; Nogbou, P.

    1993-01-01

    The administrative center in charge of handling oil spill pollution situations on the Ivory Coast, West Africa, is named Centre Ivoirien Antipollution (CIAPOL). Its organizational structure has been reshuffled recently. CIAPOL now has three divisions: a laboratory division, a division for cleaning up oil and chemical pollution at sea, and an administrative division. The risk for oil pollution is known: within the past ten years five spills have been reported. All of these have been connected to operations relating to the refinery in Abidjan. More than 2,000 ships call at the port of Abidjan every year. Minor oil slicks are found almost permanently in the harbor and the lagoons around the harbor. Lumps of tar are rather common on the beaches all along the country's coast. This paper focuses on the background investigation in sensitive areas and risk analysis that led to a revision of the oil spill contingency plan, Plan Pollumar, and the recent purchase of oil spill cleanup equipment. The creation of a regional oil pollution response center at CIAPOL for all of the countries in West Africa, is proposed

  20. Getting help quickly: older people and community worker perspectives of contingency planning for falls management.

    Science.gov (United States)

    Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana

    2018-01-01

    Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.

  1. Contingency planning for rapid reduction of greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Larsson, Nils K.

    2010-03-01

    Full Text Available The current and predicted levels of greenhouse gas (GHG emissions are, according to the best international scientific estimates, leading the world towards climate change that will have serious consequences for all countries. The problem is aggravated by the tendency of people and institutions not to take action until catastrophic consequences emerge. The history of crises in other sectors show us that reactions are likely to focus on ad-hoc reactions or using plans that are readily available, with negative results. However, the alternative of developing public plans for drastic and rapid reductions is not likely to gain support because of their radical nature. The author therefore proposes that large organizations with direct or indirect control over substantial GHG emissions should prepare private contingency plans for very rapid reductions in emissions, so that more rational and less destructive plans will be available when the appropriate moment comes for last-minute action. Examples of the type of specific plans that may be appropriate are suggested.

    Según las estimaciones científicas internacionales más optimistas, los niveles actuales y previstos de emisiones de gases de efecto invernadero (GEI están llevando al mundo hacia un cambio climático que tendrá graves consecuencias para todos los países. El problema se ve agravado por la tendencia de personas e instituciones a no tomar medidas hasta que no se perciben las catastróficas consecuencias. El historial de crisis ocurridas en otros sectores nos demuestra que las reacciones probablemente se centren en medidas ad hoc o en emplear planes que ya existían, pero sin resultados. Sin embargo, es poco probable que la alternativa al desarrollo de planes públicos para las reducciones drásticas y rápidas consiga el apoyo necesario, debido precisamente a su radicalidad. El autor recomienda por tanto que las grandes organizaciones que tengan control directo o indirecto sobre un

  2. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  3. Contingency planning at the flotilla level in the United States Coast Guard Auxiliary: flotilla 81-a case study.

    Science.gov (United States)

    Schooley, Shawn Erik

    2013-01-01

    This article presents a case study of United States Coast Guard Auxiliary Flotilla 81. Flotilla 81 created its first formal, single agency contingency plan. The research question addressed is "How can a flotilla successfully develop a contingency plan?" Five emergent themes are identified. They are offered as suggested promising practices for other flotillas in need of creating a contingency plan. Findings suggest successful contingency planning is a result of effective collaboration with community partners. Network management theory is a key to an effective contingency planning process.

  4. Criteria for selection of fuel cycle and major materials licenses needing radiological contingency plans. Regulatory report

    International Nuclear Information System (INIS)

    Fisher, F.D.

    1981-07-01

    Quantities of NRC-licensed radioisotopes requiring the licensee to develop and submit radiological contingency planning information to the NRC for review and approval are developed and presented as limiting possession limits and conditions of possession

  5. 76 FR 56294 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties... error in processing the direct- final rule. The online Federal Document Management System (FDMS) did not...

  6. 76 FR 56362 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental... processing the deletion notice. The online Federal Document Management System (FDMS) did not include required...

  7. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-30

    ... State Registry of Inactive Hazardous Waste Disposal Sites as a ``Class 2 Inactive Hazardous Waste Site..., Chemicals, Hazardous waste, Hazardous substances, Intergovernmental relations, Natural resources, Oil... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the SMS...

  8. 76 FR 510 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-01-05

    ..., Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Site is located in Albuquerque, Bernalillo County, New Mexico. After this deletion, this 62 acres will...

  9. 120-D-1 (100-D) Ponds supplemental information to the Hanford Facility Contingency Plan. Revision 2

    International Nuclear Information System (INIS)

    Petersen, S.W.; Zoric, J.P.

    1997-06-01

    This document is a supplement to the Hanford Facility Contingency Plan and provides the unit-specific information needed to fully comply with the Washington Administrative Code 173-303 for contingency plans. The 100-D ponds are unlined surface impoundments that were mainly used to dispose of nondangerous wastewater, The ponds are designated as a single treatment, storage, and/or disposal unit because of potential corrosive characteristics of the wastewater. No waste is currently present at the 100-D Ponds

  10. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  11. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Science.gov (United States)

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  12. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Science.gov (United States)

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  13. Contingent approach to Internet-based supply network integration

    Science.gov (United States)

    Ho, Jessica; Boughton, Nick; Kehoe, Dennis; Michaelides, Zenon

    2001-10-01

    The Internet is playing an increasingly important role in enhancing the operations of supply networks as many organizations begin to recognize the benefits of Internet- enabled supply arrangements. However, the developments and applications to-date do not extend significantly beyond the dyadic model, whereas the real advantages are to be made with the external and network models to support a coordinated and collaborative based approach. The DOMAIN research group at the University of Liverpool is currently defining new Internet- enabled approaches to enable greater collaboration across supply chains. Different e-business models and tools are focusing on different applications. Using inappropriate e- business models, tools or techniques will bring negative results instead of benefits to all the tiers in the supply network. Thus there are a number of issues to be considered before addressing Internet based supply network integration, in particular an understanding of supply chain management, the emergent business models and evaluating the effects of deploying e-business to the supply network or a particular tier. It is important to utilize a contingent approach to selecting the right e-business model to meet the specific supply chain requirements. This paper addresses the issues and provides a case study on the indirect materials supply networks.

  14. Effective communications system for a national oil spill contingency plan in Nigeria

    International Nuclear Information System (INIS)

    Adeyemi-Wilson, O.A.

    1991-01-01

    This paper describes what constitute an Effective Communications System for a National Oil Spill Contingency Plan. It discusses the system available in Nigeria for the oil exploration and producing companies, the Nigerian National Petroleum Corporation (NNPC) and the only oil spill response cooperative, the Clean Nigeria Associates (CNA). The Emergency Communications System which the companies had in place for some time, but is no longer functioning because of bureaucratic problems, is mentioned. The paper also mentioned the need to integrate the various separate systems already in use to provide effective communication for proper oil spill response. It recognizes the need for support from the Ministry of Communications and the two government agencies, NITEL and NET which provide telephone services in Nigeria. A proposed Effective Communications System for Nigeria is described

  15. 202-S Hexone Facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the 202-S Hexone Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. The 202-S Hexone Facility is not used to process radioactive or nonradioactive hazardous material. Radioactive, dangerous waste material is contained in two underground storage tanks, 276-S-141 and 276-S-142. These tanks do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 202-S Hexone Facility

  16. Standard format and content for radiological contingency plans for fuel cycle and materials facilities. Regulatory report

    International Nuclear Information System (INIS)

    1981-07-01

    This report is issued as guidance to those fuel cycle and major materials licensees who are required by the NRC to prepare and submit a radiological contingency plan. This Standard Format has been prepared to help assure uniformity and completeness in the preparation of those plans

  17. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  18. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  19. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  20. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  1. Application of Planned Behavior Theory to Account for College Students' Occupational Intentions in Contingent Employment

    Science.gov (United States)

    Huang, Jie-Tsuen

    2011-01-01

    The purpose of this study was to apply Ajzen's (1991) theory of planned behavior to examine college students' intentions to engage in contingent employment. Data were collected from 845 students in 8 colleges and universities in Taiwan. The results of structural equation modeling analyses indicated that both attitude and subjective norms were…

  2. 76 FR 11350 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-03-02

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: February... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Mexico, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the...

  3. 75 FR 55479 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-09-13

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... . SUPPLEMENTARY INFORMATION: The portion of the site to be deleted from the NPL is the surface media (soil... further actions. List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control...

  4. 77 FR 31215 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-05-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... the surface soil, unsaturated subsurface soil, surface water and sediments of Operable Unit (OU) 1...: The Environmental Protection Agency (EPA) Region 8 announces the deletion of Operable Unit (OU) 1--the...

  5. Contingency plan improvement for managing oil spills in the coastal waters of Thailand.

    Science.gov (United States)

    Singkran, Nuanchan

    2014-12-15

    The estimated risks of being impacted by oil spills in the coastal waters were used to improve the oil spill contingency plan of Thailand. Functional roles of local agencies are integrated into the plan. Intensive measures are suggested for the coastal provinces located in high-very high risk zones, whereas light and moderate measures are suggested for the coastal provinces located in low and moderate risk zones, respectively. The estimated percentage risks due to simulated oil slicks hitting the coast and/or important resources (PRoilspill) were used to guide the year-round water activities that should be carefully handled at a certain radius with a low-moderate PRoilspill, whereas they should be avoided at a certain radius with a high-very high PRoilspill. Important measures before, during, and post periods of an oil spill incident are suggested to prevent and monitor oil spill incidents and mitigate their impacts on the environment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Contingency planning for electronic health record-based care continuity: a survey of recommended practices.

    Science.gov (United States)

    Sittig, Dean F; Gonzalez, Daniel; Singh, Hardeep

    2014-11-01

    Reliable health information technology (HIT) in general, and electronic health record systems (EHRs) in particular are essential to a high-performing healthcare system. When the availability of EHRs are disrupted, alternative methods must be used to maintain the continuity of healthcare. We developed a survey to assess institutional practices to handle situations when EHRs were unavailable for use (downtime preparedness). We used literature reviews and expert opinion to develop items that assessed the implementation of potentially useful practices. We administered the survey to U.S.-based healthcare institutions that were members of a professional organization that focused on collaboration and sharing of HIT-related best practices among its members. All members were large integrated health systems. We received responses from 50 of the 59 (84%) member institutions. Nearly all (96%) institutions reported at least one unplanned downtime (of any length) in the last 3 years and 70% had at least one unplanned downtime greater than 8h in the last 3 years. Three institutions reported that one or more patients were injured as a result of either a planned or unplanned downtime. The majority of institutions (70-85%) had implemented a portion of the useful practices we identified, but very few practices were followed by all organizations. Unexpected downtimes related to EHRs appear to be fairly common among institutions in our survey. Most institutions had only partially implemented comprehensive contingency plans to maintain safe and effective healthcare during unexpected EHRs downtimes. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  7. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  8. Integrated Waste Treatment Unit GFSI Risk Management Plan

    International Nuclear Information System (INIS)

    W. A. Owca

    2007-01-01

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP)

  9. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  10. Contingency plan for the Oak Ridge National Laboratory liquid low-level waste system

    International Nuclear Information System (INIS)

    DePaoli, S.M.; Ferrada, J.J.; Abraham, T.J.; Brown, C.H.; Lin, K.H.

    1989-12-01

    Oak Ridge National Laboratory (ORNL) is one of the major Department of Energy (DOE) facilities that performs various research and development (R ampersand D) activities. Liquid low-level waste (LLLW) is generated in the course of this work. The primary objective of this task is to develop specific plans of action to be implemented, in the event that the storage space for the LLLW concentrate should approach the minimum value in the operational flexibility range or a problem should develop concerning storage space available for dilute LLLW. This report considers contingency plans/options in the light of six different scenarios, including ''normal operation'' and five others. Evaluation and prioritization of the options were carried out separately for each case. Brief discussions of these scenarios and contingency plans/options are presented. 20 refs., 14 figs., 14 tabs

  11. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  12. ANALISIS SENSITIVITAS LINGKUNGAN OSCP (OIL SPILL CONTINGENCY PLAN DI PESISIR SELATAN DELTA MAHAKAM, PROVINSI KALIMANTAN TIMUR

    Directory of Open Access Journals (Sweden)

    Mursalin Mursalin

    2014-07-01

    Full Text Available The research was one part of oil spill contingency plan (OSCP developed for Delta Mahakam area, where oil & gas exploration and exploitation linked with rich biodiversity supporting coastal community livelihood. Environmental sensitivity  analysis for OSCP only do two early stages of OSCP scope, which integrated with the dangers of coastal vulnerability. This analysis mapped environmental component from oil pollution become sensitivity rangking as an effort to support response development strategies and priorities for the coastal resources protection. The aims of this research were (1 to establish environment sensitivity rank and (2 to identify primary factor supporting the environmental sensitivity for OSCP in south Delta Mahakam area. The result of analysis showed environmenal sensitivity was 62.37% (517.52 km, its mean very high sensitivity. Then the high sensitivity criteria was 11.31% (94 km. The criteria of medium sensitivity was 11.92% (99 km. While for low sensitivity and very low sensitivity respectively were 1.78% (15 km and 12.64% (105 km. Based on Principal Component Analysis (PCA, 36.01%  variability was explained by axis of factor 1. The others variability 18.53% and 13.93% were explained by axis of the factor 2 and factor 3. Axis of factor 1 for coastal exposure (EK, oil residence index (OR, coastal type (TP, and biological resources (SH had a quite large linear combinations coefficient, amounted to 0.94 (EK&OR, 0.83 (TP and 0.75 (SH. This indicated a very high contribution for environmental sensitivity OSCP level drafting. On axis of factor 2, the linear coeffisien combinations for the resource utilization of port (PL was 0.83 and settlement (PM was 0.85. Axis of factor 3 contributed 0.75 and 0.66 on migas platform (PO and placement of passive fishing gear/catchment area (AT. However, the utilization of coastal resources for PL, PM, PO and AT were on axis of factor 2 and factor 3 had a considerable distance with its SI variable

  13. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  14. Contingency plans for the ISEE-3 libration-point mission

    Science.gov (United States)

    Dunham, D. W.

    1979-01-01

    During the planning stage of the International Sun-Earth Explorer-3 (ISEE-3) mission, a recovery strategy was developed in case the Delta rocket underperformed during the launch phase. If a large underburn had occurred, the ISEE-3 spacecraft would have been allowed to complete one revolution of its highly elliptical earth orbit. The recovery plan called for a maneuver near perigee to increase the energy of the off-nominal orbit; a relatively small second maneuver would then insert the spacecraft into a new transfer trajectory toward the desired halo orbit target, and a third maneuver would place the spacecraft in the halo orbit. Results of the study showed that a large range of underburns could be corrected for a total nominal velocity deviation cost within the ISEE-3 fuel budget.

  15. The Peoples Liberation Army and Contingency Planning in China

    Science.gov (United States)

    2015-01-01

    protests; blocking traffic; or large-scale gatherings involving sporting events, commercial activities, or entertainment . During such events, the...holding large-scale exhibi- tions and cultural, sports , or other events. Recent examples where such plans appear to have been in place include the...pollution, and damage to the environment • public health incidents, which include epidemics, food safety and occu- pational hazards, animal diseases, and

  16. Standby Gasoline Rationing Plan. Contingency gasoline rationing regulations

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The Economic Regulatory Administration issues final rules with respect to standby gasoline rationing. The plan is designed for and would be used only in the event of a severe gasoline shortage. The plan provides that eligibility for ration allotments will be primarily on the basis of motor vehicle registrations. DOE will mail government ration checks to the parties named in a national vehicle registration file to be maintained by DOE. Ration recipients may cash these checks for ration coupons at various designated coupon issuance points. Retail outlets and other suppliers will be required to redeem the ration coupons received in exchange for gasoline sold. Supplemental gas will be given to high-priority activities. A ration banking system will be established with two separate and distinct of ration accounts: retail outlets and other suppliers will open redemption accounts for the deposit of redeemed ration rights; and individuals or firms may open ration rights accounts, which will operate in much the same manner as monetary checking accounts. A white market will be permitted for the sale of transfer of ration rights. A percentage of the total ration rights to be issued will be reserved for distribution to the states as a State Ration Reserve, to be used by the states primarily for the relief of hardship. A National Ration Reserave will also be established. All sections of the Standby Gasoline Rationing Regulations are analyzed. (MCW)

  17. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  18. The Influence of Green Supply Chain Integration on Firm Performance: A Contingency and Configuration Perspective

    Directory of Open Access Journals (Sweden)

    Yongtao Song

    2017-05-01

    Full Text Available This study investigates the impacts of three dimensions of green supply chain integration (GSCI on operational and financial performance, from both a contingency and a configuration perspective. From the contingency perspective, we used hierarchical regression to determine the impacts of individual GSCI dimensions (green internal, customer and supplier integration and their interactions on firm performance. From the configuration perspective, we used cluster analysis to develop patterns of GSCI, which were analyzed in terms of GSCI strength and balance. Analysis of variance was used to examine the relationship between GSCI pattern and firm performance. We used data collected from manufacturing firms in Shanxi, Shandong, Beijing, Guangdong and Jiangsu to test hypotheses. The findings from both the contingency and configuration perspective indicate that GSCI was related to both operational and financial performance. Furthermore, the interaction between green internal integration and green customer integration was positively related to both operational and financial performance, while the interaction between green internal integration and green supplier integration was negatively related to financial performance. The interaction between green customer integration and green supplier integration was positively related to financial performance.

  19. Integrating financial and strategic planning.

    Science.gov (United States)

    Pivnicny, V C

    1989-09-01

    As hospitals face mounting profitability and liquidity concerns, the need to integrate strategic and financial planning also will continue to grow. This article describes a process for integrating these planning functions and the ideal organizational framework to facilitate the process. Obstacles to the integration of these planning processes also are discussed.

  20. Contingency planning and risk analysis for water and tailings management at Ranger Uranium Mines

    International Nuclear Information System (INIS)

    McNally, P.E.

    1986-01-01

    This paper describes some of the more likely risks and contingency procedures associated with the extremely variable monsoonal climate of the Alligator Rivers region in the Northern Territory in relation to the Ranger Uranium Mine. The tailings management system is basically a large storage impoundment and a reticulation system that delivers tailings sludge and recycles supernatant water. It is a closed circuit within the water management system and is dealt with as an integral part of that system

  1. Oil spill contingency planning for offshore oil fields - a new concept established for the Norwegian continental shelf

    International Nuclear Information System (INIS)

    Singsaas, I.; Reed, M.; Nygaard, T.; Sundnes, G.Jr.

    1998-01-01

    The development of a new concept for oil spill contingency planning to be used for offshore oil fields on the Norwegian continental shelf was discussed. The factors which are important in developing a good oil spill contingency plan include a good understanding of: (1) the fate, behaviour and weathering of the specific oil, (2) relevant oil spill scenarios, (3) drift and spreading of the oil, and (4) specific requirements for the effectiveness of the chosen response options. The oil spill contingency and response (OSCAR) model was used for quantitative comparison of alternative response options. 21 refs., 2 tabs., 7 figs

  2. Integrated formal operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

    1994-01-05

    The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

  3. Space shuttle operations integration plan

    Science.gov (United States)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  4. 190-C Facility <90 Day Storage Pad supplemental information to the Hanford facility contingency plan

    International Nuclear Information System (INIS)

    Little, N.C.

    1996-12-01

    The 190-C Facility <90 Day Storage Pad stores waste oils primarily contaminated with lead generated while draining equipment within the building of residual lubricating oils. Waste oils are packaged and stored in fifty-five gallon drums, or other containers permitted by the Site Specific Waste Management Instruction. Bechtel Hanford, Inc. (BHI) manual BHI-EE-02, Environmental Requirements Procedures, references this document. This document is to be used to demonstrate compliance with the contingency plan requirements in Washington Administrative Code, Chapter 173-303, Dangerous Waste Regulations, for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units (units). Refer to BHI-EE-02, for additional information

  5. Proposed energy conservation contingency plan: emergency restrictions on illuminated advertising and certain gas lighting. Economic impact analysis. Environmental impact assessment. Contingency plan No. 5

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and natural gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.

  6. Integrated transportation scenario planning.

    Science.gov (United States)

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  7. Australian contingency plans for emergency animal disease control: the role of antigen/vaccine banks.

    Science.gov (United States)

    Tweddle, N E

    2004-01-01

    Vaccination is an important element of contingency plans for many animal diseases. The decision whether or not to use vaccine is complex, and must consider epidemiological, economic and social issues. Vaccines are rarely available in a country for emergency animal diseases unless a low pathogenicity strain of the agent is present or it is localised in carrier hosts. High quality commercial vaccine from overseas is often the preferred source of vaccine in an emergency, although less reliable sources may be used with additional safeguards. Alternatively, master seeds may be imported or developed for production within the country For contingency planning, diseases may be ranked according to the expected role of vaccine in the disease eradication strategy, with diseases for which vaccine is part of the initial response strategy receiving highest priority for action. A range of preparedness options is available, ranging from identifying producers of vaccine, obtaining permits for import and use from regulatory authorities, to establishing vaccine or antigen banks. Countries need to consider their individual situations and develop strategies to address the diseases of significance to them.

  8. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan...

  9. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan...

  10. A High Performance System With Explicit Incorporation of ATC Regulations to Generate Contingency Plans for UAVs with Lost Communication, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a comprehensive and systematic contingency plan generation framework to deal with lost communication in UAVs. ATC regulations are explicitly incorporated...

  11. Integrated State Estimation and Contingency Analysis Software Implementation using High Performance Computing Techniques

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt R.; Rice, Mark J.; Huang, Zhenyu

    2015-12-31

    Power system simulation tools are traditionally developed in sequential mode and codes are optimized for single core computing only. However, the increasing complexity in the power grid models requires more intensive computation. The traditional simulation tools will soon not be able to meet the grid operation requirements. Therefore, power system simulation tools need to evolve accordingly to provide faster and better results for grid operations. This paper presents an integrated state estimation and contingency analysis software implementation using high performance computing techniques. The software is able to solve large size state estimation problems within one second and achieve a near-linear speedup of 9,800 with 10,000 cores for contingency analysis application. The performance evaluation is presented to show its effectiveness.

  12. Contingency planning for oil spill response: A program of joint IMO/oil industry regional seminars

    International Nuclear Information System (INIS)

    Bavister, R.; Wonham, J.

    1993-01-01

    Cooperative efforts between the oil industry and governments at the national and local levels have resulted in a series of reports for both technical and general audiences on subjects relating to oil spills, as well as an ongoing series of government/industry regional seminars for senior executives. The seminars emphasize the crucial importance of joint government/industry attention to contingency planning. These activities, which are continuing, are organized under the auspices of an International Petroleum Industry Environmental Conservation Association working group, and the International Maritime Organization. Feedback is solicited from seminar participants for use in planning further seminars and to give the IMO a clear picture of follow up activities that have resulted from the seminars

  13. Contingency plan for the Lawrence Livermore National Laboratory, Site 300, hazardous waste operations

    International Nuclear Information System (INIS)

    Gonzalez, M.A.

    1983-01-01

    This contingency plan for hazardous waste release provides guidance for coordinating response efforts. With a goal to minimize hazards to human health and life; and protect livestock, wildlife, the environment, and property in the event of a fire, explosion, or any unplanned release of hazardous substances or mixtures to the air, water, or soil. In this document, hazardous waste includes all waste substances or mixtures that: contain any of the hazardous substances listed in the Resource Conservation and Recovery Act; have the characteristic of being toxic, flammable, reactive, corrosive, an irritant, and/or a strong sensitizer; are radioactive and are used in experiments at Site 300; or could have a significant effect on the environment. This Plan includes an overview of emergency response capabilities; and responsibilities assigned to both LLNL and non-LLNL emergency response personel

  14. Contingency plan for deployment of the void fraction instrument in Tank 241-AY-102

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1999-01-01

    High-heat producing sludge from tank 241-C-106 will be sluiced and transferred to tank 241-AY-102 beginning in October 1998. Safety analyses have postulated that after retrieval, the waste in 241-AY-102 may generate and retain unsafe levels of flammable gases (Noorani 1998, Pasamebmetoglu etal. 1997). Unsafe levels of retained gas are not expected, but cannot be ruled out because of the large uncertainty in the gas generation and retention rates. The Tank Waste Remediation System Basis for Interim Operation (Noorani 1998) identifies the need for a contingency plan to add void fraction monitoring to tank 241-AY-102 within 2 weeks of the identification of flammable gas buildup that would warrant monitoring. The Tank 241-C-106 Waste Retrieval Sluicing System Process Control Plan (Carothers et al. 1998) committed to providing a contingency plan for deployment of the void fraction instrument (VFI) in tank 241-AY-102. The VFI determines the local void fraction of the waste by compressing a waste sample captured in a gas-tight test chamber. The sample chamber is mounted on the end of a 76-cm (2.5-ft) arm that can be rotated from vertical to horizontal when the instrument is deployed. Once in the waste, the arm can be positioned horizontally and rotated to sample in different areas below the riser. The VFI is deployed using a crane. The VFI has been deployed previously in 241-AW, 241-AN, and 241-SY tank farms, most recently in tank 241-SY-101 in June and July 1998. An additional test in tank 241-SY-101 is planned in September 1998. Operating instructions for the VFI are included in the Void Fraction Instrument Operation and Maintenance Manual (Pearce 1994)

  15. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  16. Technology integration plan

    International Nuclear Information System (INIS)

    Henry, R.; Sumpter, K.C.

    1995-01-01

    In 1992, the Secretary of Energy directed the Assistant Secretary for Environmental Management (EM) to develop an integrated, long-term, spent nuclear fuel (SNF) management program. In response, EM created the Integrated SNF Program to assess the US Department of Energy (DOE) SNF and SNF storage facilities. As shown in Figure 1 the Integrated SNF Program is responsible for life-cycle management of DOE SNF; that is characterization, processing, interim storage and preparation for disposal. In order to implement the Program it was recognized that technology needs must be identified. A Technology Integration Program was formed to integrate the DOE complex-wide efforts for establishing timely, cost effective and consistent technical criteria for the development of technical solutions. The program is directed toward identification of: (a) what activities need to be done, (b) when they need to be completed, and (c) what priority should be assigned to the various activities

  17. Groundwater regulation and integrated planning

    Science.gov (United States)

    Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.

    2016-01-01

    The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.

  18. AIS ASM Operational Integration Plan

    Science.gov (United States)

    2013-08-01

    Rack mount computer AIS Radio Interface Ethernet Switch 192.168.0.x Firewall Cable Modem 192.168.0.1 VTS Accred. Boundary AIS ASM Operational... AIS ASM Operational Integration Plan Distribution Statement A: Approved for public release; distribution is unlimited. August 2013 Report No...CD-D-07-15 AIS ASM Operational Integration Plan ii UNCLAS//Public | CG-926 R&DC | I. Gonin, et al. | Public August 2013 N O T I C

  19. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal Direct Loan Program Catalog of Federal Domestic Assistance (CFDA) Number... free, at 1- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan...

  20. Snakes: An Integrated Unit Plan.

    Science.gov (United States)

    Lawrence, Lisa

    This document presents an integrated unit plan on snakes targeting second grade students. Objectives of the unit include developing concepts of living things, understanding the contribution and importance of snakes to the environment, and making connections between different disciplines. The unit integrates the topic of snakes into the areas of…

  1. Planning for Integrating Teaching Technologies

    Directory of Open Access Journals (Sweden)

    Mandie Aaron

    2004-06-01

    Full Text Available Teaching technologies offer pedagogical advantages which vary with specific contexts. Successfully integrating them hinges on clearly identifying pedagogical goals, then planning for the many decisions that technological change demands. In examining different ways of organizing this process, we have applied planning tools from other domains - Fault Tree Analysis and Capability Maturity Modeling- at the school and college levels. In another approach, we have examined attempts to broadly model the integration process at the university level. Our studies demonstrate that the use of a variety of tools and techniques can render the integration of teaching technologies more systematic.

  2. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  3. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  4. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  5. Integrated Facilities and Infrastructure Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Reisz Westlund, Jennifer Jill

    2017-03-01

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

  6. [Scientific basis of environmental health contingency planning for a coastal oil spill].

    Science.gov (United States)

    Kim, Young Min; Cheong, Hae Kwan; Kim, Jong Ho; Kim, Jong Hun; Ko, Kumsook; Ha, Mina

    2009-03-01

    This study presents a scientific basis for the establishment of an environmental health contingency plan for dealing with accidental coastal oil spills and suggests some strategies for use in an environmental health emergency. We reviewed the existing literature, and analyzed the various fundamental factors involved in response strategies for oil spill. Our analysis included data derived from Hebei Spirit oil spill and used air dispersion modeling. Spill amounts of more than 1,000 kl can affect the health of residents along the coast, especially those who belong to vulnerable groups. Almost 30% of South Korean population lives in the vicinity of the coast. The area that is at the highest risk for a spill and that has the greatest number of people at risk is the stretch of coastline from Busan to Tongyeong. The most prevalent types of oil spilt in Korean waters have been crude oil and bunker-C oil, both of which have relatively high specific gravity and contain volatile organic compounds, polycyclic aromatic hydrocarbons, and metals. In the case of a spill of more than 1,000 kl, it may be necessary to evacuate vulnerable and sensitive groups. The government should establish environmental health planning that considers the spill amount, the types of oil, and the distance between the spot of the accident and the coast, and should assemble a response team that includes environmental health specialists to prepare for the future oil spill.

  7. A guide to contingency planning for oil spills on water. V. 2

    International Nuclear Information System (INIS)

    1997-01-01

    The movement of oil from the dominant production centres of the world to the world-wide market is primarily achieved by the use of tankers and pipelines. The global pattern of marine transport is well established as shown in Figure 1, below. While the environmental priority for all tanker operations is the prevention of spills, it is recognized that marine spills are a factor for which management must plan. This report, which is prepared for those managements in industry and government, describes the elements of the contingency planning process. It stresses the importance of cooperative activity between industry and government. It presents a consensus view of the IPIECA membership which is representative of the international oil industry. It reflects current informed thinking in the light of the extensive individual company and industry organization reviews that have taken place since the Exxon Valdez and other major incidents in 1989/90. This report has drawn freely on many of these reviews, some of which have been published. (UK)

  8. Measuring resilience in integrated planning

    DEFF Research Database (Denmark)

    Apneseth, K.; Wahl, A. M.; Hollnagel, E.

    2013-01-01

    This chapter demonstrates how a Resilience Analysis Grid (RAG) can be used to profile the performance of a company in terms of the four abilities that characterize a resilient organization. It describes the development of a new, RAG-based tool founded on Resilience Engineering principles that can...... be used to assess an organization's resilience. The tool was tested in a case study involving a company in the offshore oil and gas industry. The company had decided to adopt an Integrated Operations (IO) approach to operations and maintenance planning and the tool was used to evaluate the impact...... of the Integrated Planning (IPL) process on its resilience....

  9. Step 1: Human System Integration (HSI) FY05 Pilot-Technology Interface Requirements for Contingency Management

    Science.gov (United States)

    2005-01-01

    This document involves definition of technology interface requirements for Contingency Management. This was performed through a review of Contingency Management-related, HSI requirements documents, standards, and recommended practices. Technology concepts in use by the Contingency Management Work Package were considered. Beginning with HSI high-level functional requirements for Contingency Management, and Contingency Management technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of system failures and associated contingency procedures, and (2) the control capability needed by the pilot to obtain system status and procedure information. Fundamentally, these requirements provide the candidate Contingency Management technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Contingency Management operations and functions should interface with the pilot to provide the necessary Contingency Management functionality to the UA-pilot system. Requirements and guidelines for Contingency Management are partitioned into four categories: (1) Health and Status and (2) Contingency Management. Each requirement is stated and is supported with a rationale and associated reference(s).

  10. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Giebel, Gregor; Nielsen, T. S.

    2012-01-01

    model to be developed in collaboration with ENFOR A/S; a danish company that specialises in forecasting and optimisation for the energy sector. This integrated prediction model will allow for the description of the expected variability in wind power production in the coming hours to days, accounting......This poster presents the current state of the public service obligation (PSO) funded project PSO 10464, with the working title "Integrated Wind Power Planning Tool". The project commenced October 1, 2011, and the goal is to integrate a numerical weather prediction (NWP) model with purely...

  11. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  12. 216-A-29 Ditch supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-29 Ditch and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-29 Ditch is a surface impoundment that received nonregulated process and cooling water and other dangerous wastes primarily from operations of the Plutonium/Uranium Extraction Plant. Active between 1955 and 1991, the ditch has been physically isolated and will be closed. Because it is no longer receiving discharges, waste management activities are no longer required at the unit. The ditch does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-A-29 Ditch

  13. 216-U-12 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-U-12 Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-U-12 Crib is a landfill that received waste from the 291-U-1 Stack, 244-WR Vault, 244-U via tank C-5, and the UO 3 Plant. The crib pipeline was cut and permanently capped in 1988, and the crib has been backfilled. The unit will be closed under final facility standards. Waste management activities are no longer required at the unit. The crib does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-U-12 Crib

  14. 216-A-36B Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-36B Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-36B Crib is a landfill that received ammonia scrubber waste from the 202-A Building (Plutonium/Uranium Extraction Plant) between 1966 and 1972. In 1982, the unit was reactivated to receive additional waste from Plutonium/Uranium Extraction operations. Discharges ceased in 1987, and the crib will be closed under final facility standards. Because the crib is not receiving discharges, waste management activities are no longer required. The crib does not present a significant hazard to adjacent units, personnel, or the environment. There is little likelihood that any incidents presenting hazards to public health or the environment would occur at the 216-A-36B Crib

  15. Nonradioactive Dangerous Waste Landfill supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the Nonradioactive Dangerous Waste Landfill and is intended to be used as a supplement to DOE/RL-93-75, 'Hanford Facility Contingency Plan.' This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173-303 for certain Resource, Conservation and Recovery Act of 1976 waste management units. The Nonradioactive Dangerous Waste Landfill (located approximately 3.5 miles southeast of the 200 East Area at the Hanford Site) was used for disposal of nonradioactive dangerous waste from January 1975 to May 1985. Currently, there are no dangerous waste streams disposed in the Nonradioactive Dangerous Waste Landfill. Dangerous waste management activities are no longer required at the landfill. The landfill does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that incidents presenting hazards to public health or the environment would occur at the Nonradioactive Dangerous Waste Landfill

  16. 105-DR Large Sodium Fire Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-05-01

    This document is a unit-specific contingency plan for the 105-DR Large Sodium Fire Facility and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of Washington Administrative Code (WAC) 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units.The LSFF occupied the former ventilation supply fan room and was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires. The unit was used to conduct experiments for studying the behavior of molten alkali metals and alkali metal fires. This unit had also been used for the storage and treatment of alkali metal dangerous waste. Additionally, the Fusion Safety Support Studies programs sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium-lead compounds. The LSFF, which is a RCRA site, was partially clean closed in 1995 and is documented in 'Transfer of the 105-DR Large Sodium Fire Facility to Bechtel Hanford, Inc.' (BHI 1998). In summary, the 105-DR supply fan room (1720-DR) has been demolished, and a majority of the surrounding soils were clean-closed. The 117-DR Filter Building, 116-DR Exhaust Stack, 119- DR Sampling Building, and associated ducting/tunnels were not covered under this closure

  17. Contingency plans and successful response strategies for oil spills into rivers

    Energy Technology Data Exchange (ETDEWEB)

    Owens, Edward H. [Polaris Applied Sciences Inc., Bainbridge Island, WA (United States)]. E-mail: ehowens@polarisappliedsciences.com

    2003-07-01

    Oil spilled into a river enters a dynamic environment. An effective response can only succeed if the dynamics of the river system are understood and if the strategies and tactics are designed to match these conditions. Oil is transported downstream at the speed of the current, therefore, an estimate of the rate of movement is essential to identify effective intercept locations. Boom performance is affected by local surface water velocities as entrainment of oil typically begins when velocities exceed 0.4 m/s. However, boom configurations can be effective in current velocities as great as 2.5 m/s. Response operations can be successful if staging or control locations have been identified as part of contingency planning and if booms are deployed to take into account local surface current characteristics. Tracking and control of submerged or sunken oil is difficult and may not be practical. Recovery operations for sunken oil depend on the channel depth, current velocities, and on the distribution and concentration of the oil. (author)

  18. Using contingent choice methods to assess consumer preferences about health plan design.

    Science.gov (United States)

    Marquis, M Susan; Buntin, Melinda Beeuwkes; Kapur, Kanika; Yegian, Jill M

    2005-01-01

    American insurers are designing products to contain health care costs by making consumers financially responsible for their choices. Little is known about how consumers will view these new designs. Our objective is to examine consumer preferences for selected benefit designs. We used the contingent choice method to assess willingness to pay for six health plan attributes. Our sample included subscribers to individual health insurance products in California, US. We used fitted logistic regression models to explore how preferences for the more generous attributes varied with the additional premium and with the characteristics of the subscriber. High quality was the most highly valued attribute based on the amounts consumers report they are willing to pay. They were also willing to pay substantial monthly premiums to reduce their overall financial risk. Individuals in lower health were willing to pay more to reduce their financial risk than individuals in better health. Consumers may prefer tiered-benefit designs to those that involve overall increases in cost sharing. More consumer information is needed to help consumers better evaluate the costs and benefits of their insurance choices.

  19. A new wave-current online information system for oil spill contingency planning (WAVCIS)

    International Nuclear Information System (INIS)

    Stone, G.W.

    2001-01-01

    A Wave Current Information System (WAVCIS) for coastal Louisiana was presented. WAVCIS is an online oceanographic and meteorological observing system that provides many benefits to oil spill contingency planning. The system provides wave information such as wave height, period, direction of propagation, water level, surge, water column velocity profiles and meteorological conditions on a near real time basis. The information is gathered from several stations along Louisiana's coast in the Gulf of Mexico and is transmitted via cellular satellite telephone to a base station at Louisiana State University where it is then made available on the Internet. The database provides information regarding emergency response decision tools for agencies faced with decision making during storm threats or during coordination of an oil spill response operation. It also provides information needed for assisting operations support for offshore industries, commerce and trade. In addition, it can be used to obtain input boundary conditions for numerical modelling of surface and underwater oil and gas or mixtures of oil and gas. It was concluded that WAVCIS provides several benefits, including better cursory assessment of oil spill migration, precision numerical modeling of casts for oil spill trajectories, an important archived data set to assess trajectory modeling, and real-time environmental conditions for vessel operators using dispersants and in situ burning methods. 3 refs., 17 figs

  20. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Hahmann, Andrea N.; Nielsen, T. S.

    This poster describes the status as of April 2012 of the Public Service Obligation (PSO) funded project PSO 10464 \\Integrated Wind Power Planning Tool". The project goal is to integrate a meso scale numerical weather prediction (NWP) model with a statistical tool in order to better predict short...... term power variation from off shore wind farms, as well as to conduct forecast error assessment studies in preparation for later implementation of such a feature in an existing simulation model. The addition of a forecast error estimation feature will further increase the value of this tool, as it...

  1. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories.

    Science.gov (United States)

    Koenen, F; Uttenthal, A; Meindl-Böhmer, A

    2007-12-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.

  2. Resource Estimations in Contingency Planning for Foot-and-Mouth Disease

    Directory of Open Access Journals (Sweden)

    Anette Boklund

    2017-05-01

    Full Text Available Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of Euros due to the closure of export markets. This is important for the Danish husbandry industry, especially the swine industry, which had an export of €4.4 billion in 2012. The purposes of this project were to (1 develop an iterative tool with the aim of estimating the resources needed during an outbreak of foot-and-mouth disease (FMD in Denmark, (2 identify areas, which can delay the control of the disease. The tool developed should easily be updated, when knowledge is gained from other veterinary crises or during an outbreak of FMD. The stochastic simulation model DTU-DADS was used to simulate spread of FMD in Denmark. For each task occurring during an epidemic of FMD, the time and personnel needed per herd was estimated by a working group with expertise in contingency and crisis management. By combining this information, an iterative model was created to calculate the needed personnel on a daily basis during the epidemic. The needed personnel was predicted to peak within the first week with a requirement of approximately 123 (65–175 veterinarians, 33 (23–64 technicians, and 36 (26–49 administrative staff on day 2, while the personnel needed in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection of the farm was predicted to be 174 (58–464, mostly recruits. The time needed for surveillance visits was predicted to be the most influential factor in the calculations. Based on results from a stochastic simulation model, it was possible to create an iterative model to estimate the requirements for personnel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other crisis or

  3. 14 CFR 259.4 - Contingency plan for lengthy tarmac delays.

    Science.gov (United States)

    2010-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.4 Contingency..., assurance that the air carrier will provide adequate food and potable water no later than two hours after... flights covered in paragraph (b)(2) of this section, and for the trigger point for food and water covered...

  4. Development of a unified federal/state coastal/inland oil and hazardous substance contingency plan for the state of Alaska

    International Nuclear Information System (INIS)

    Lautenberger, C.; Pearson, L.

    1993-01-01

    Passage of the US Oil Pollution Act (OPA) of 1990 expanded the existing federal planning and response framework in several ways. The OPA created a new requirement for facility and tank vessel response plans and creates an area-level planning and coordination structure to help supplement federal, regional, and local planning efforts. The OPA amended the existing Clean Water Act's section 311(j)(4), which establishes area committees and area contingency plans as primary components of this structure. In 1980, the Alaska legislature enacted legislation which defines the state's policies regarding oil spills. Following the 1989 Exxon Valdez spill, additional legislation was passed to expand and strengthen the state's oil spill program. Specifically, in 1989 the Senate Bill 261 required the Alaska Department of Environmental Conservation to develop, annually review, and revise the State Oil and Hazardous Substance Contingency Plans (State Master and Regional Plans). State regional plans serve as annexes to the State Master Plan. The coordinated and cooperative efforts by government agencies and local entities toward creating a unified federal/state, coastal/inland Oil and Hazardous Substance Contingency Plan are presented, along with the development and progress of unified area/regional contingency plans for Alaska. 3 figs

  5. Buried Waste Integrated Demonstration Plan

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented

  6. 216-A-10 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-10 Crib. The Crib is a landfill that received process condensate from the 202-A building Plutonium/Uranium Extraction Plant from 1956 to 1987. The crib has not received waste since March 1987 and will be closed under final facility standards. Waste management activities are no longer required at the crib, and it does not present significant hazard to adjacent units, personnel or the environment. It is unlikely that any incidents presenting hazards to the public health or the environment would occur at the 216-A-10 Crib

  7. Integrated assignment and path planning

    Science.gov (United States)

    Murphey, Robert A.

    2005-11-01

    A surge of interest in unmanned systems has exposed many new and challenging research problems across many fields of engineering and mathematics. These systems have the potential of transforming our society by replacing dangerous and dirty jobs with networks of moving machines. This vision is fundamentally separate from the modern view of robotics in that sophisticated behavior is realizable not by increasing individual vehicle complexity, but instead through collaborative teaming that relies on collective perception, abstraction, decision making, and manipulation. Obvious examples where collective robotics will make an impact include planetary exploration, space structure assembly, remote and undersea mining, hazardous material handling and clean-up, and search and rescue. Nonetheless, the phenomenon driving this technology trend is the increasing reliance of the US military on unmanned vehicles, specifically, aircraft. Only a few years ago, following years of resistance to the use of unmanned systems, the military and civilian leadership in the United States reversed itself and have recently demonstrated surprisingly broad acceptance of increasingly pervasive use of unmanned platforms in defense surveillance, and even attack. However, as rapidly as unmanned systems have gained acceptance, the defense research community has discovered the technical pitfalls that lie ahead, especially for operating collective groups of unmanned platforms. A great deal of talent and energy has been devoted to solving these technical problems, which tend to fall into two categories: resource allocation of vehicles to objectives, and path planning of vehicle trajectories. An extensive amount of research has been conducted in each direction, yet, surprisingly, very little work has considered the integrated problem of assignment and path planning. This dissertation presents a framework for studying integrated assignment and path planning and then moves on to suggest an exact

  8. Contingencies of Self-Worth and Psychological Distress in Iranian Patients Seeking Cosmetic Surgery: Integrative Self-Knowledge as Mediator.

    Science.gov (United States)

    Valikhani, Ahmad; Goodarzi, Mohammad Ali

    2017-08-01

    Although previous studies have shown that people applying for cosmetic surgery experience high-intensity psychological distress, important variables that function as protective factors have rarely been the subject of study in this population. Therefore, this study aims to investigate the role of low and high self-knowledge in experiencing psychological distress and contingencies of self-worth to appearance and approval from others and to identify the mediatory role of the integrative self-knowledge in patients seeking cosmetic surgery. Eighty-eight patients seeking cosmetic surgery were selected and completed the contingencies of self-worth and integrative self-knowledge scales, as well as the depression, anxiety and stress scale. Data were analyzed using multivariate analysis of variance (MANOVA) and path analysis using 5000 bootstrap resampling. The results of MANOVA showed that patients seeking cosmetic surgery with high self-knowledge had lower levels of depression, anxiety and stress compared to patients with low self-knowledge. They also gained lower scores in contingencies of self-worth to appearance and approval from others. The results of path analysis indicated that self-knowledge is a complete mediator in the relationship between contingencies of self-worth to appearance and approval from others and psychological distress. Based on the results of this study, it can be concluded that self-knowledge as a protective factor plays a major role in relation to the psychological distress experienced by the patients seeking cosmetic surgery. In fact, by increasing self-knowledge among this group of patients, their psychological distress can be decreased. This journal requires that authors assign a level of evidence to each article. For a full description of these Evidence-Based Medicine ratings, please refer to the Table of Contents or the online Instructions to Authors www.springer.com/00266 .

  9. Developing a revenue integrity improvement plan.

    Science.gov (United States)

    Banks, Kate

    2010-11-01

    A revenue integrity plan should address five key areas: Accuracy of patient information. Verification of payer information and policies. Accuracy of documentation. Processing of claims. Accuracy of payment.

  10. Engineering Task Plan for Tank 241-C-106 contingency chiller definitive design

    International Nuclear Information System (INIS)

    Rensink, G.E.; Kriskovich, J.R.

    1995-01-01

    This document identifies the scope, cost, schedule and responsible organizations for completing a design of a contingency ventilation inlet air cooling system for Tank 241-C-106. The air cooling system, described in Rensink (1995), consists of a chiller, cooling coils, and supporting equipment that, when installed will be capable of assuring that the waste temperatures in Tank 241-C-106 are maintained within acceptable limits for safe storage. The effort described herein is scheduled for completion by May 31, 1995 to support Performance Based Incentive (PBI) Milestone SI-2x

  11. Dynamic Contingency Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2016-01-14

    The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers.While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

  12. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  13. Integrated maintenance planning in manufacturing systems

    CERN Document Server

    Al-Turki, Umar M; Yilbas, Bekir Sami; Sahin, Ahmet Ziyaettin

    2014-01-01

    This book introduces the concept of integrated planning for maintenance and production taken into account quality and safety for high global socio-economic impact. It provides insight into the planning process at a global level starting from the business level and ending with the operational level where the plan is implemented and controlled.

  14. Primer on gas integrated resource planning

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S. [Lawrence Berkeley Lab., CA (United States)

    1993-12-01

    This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

  15. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  16. Visits to Australia by nuclear powered or armed vessels: contingency planning for the accidental release of ionizing radiation

    International Nuclear Information System (INIS)

    1989-01-01

    The report refers to the adequacy of current contingency planning by the Australian Federal and Senate authorities to deal with the accidental release of ionizating radiation from visiting nuclear powered or armed vessels in Australian waters and ports. Much of the material was obtained in response to questions put in writing by the Senate Standing Committee to the Department of Defence, ANSTO and others. In addition, the report contains relevant information from Commonwealth documents as well as the Committee findings and recommendations. Issues considered include: types of visiting nuclear powered vessels, accident likelihood and consequences, differences between naval and land-based reactors, safety records. The persons or organizations who made submissions or appeared in all public hearings are listed in the appendixes, along with all visits to Australian ports by nuclear powered warships from 1976 to 1988

  17. 300 Area Process Trenches Supplemental Information to the Hanford Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    R.A. Carlson

    1997-01-01

    The 300 Area Process Trenches are surface impoundments which were used to receive routine discharges of nonregulated process cooling water from operations in the 300 Area and dangerous waste from several research and development laboratories and the 300 Area Fuels Fabrication process. Discharges to the trenches ceased in 1994, and they were physically isolated in 1995. Remediation of the trenches is scheduled to begin during July 1997. Currently, there are no waste management activities required at the 300 Area Process Trenches and the unit does not present any significant hazards to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 300 Area Process Trenches, however, during remediation, exposure, spill, fire, and industrial hazards will exist. This contingency plan addresses the emergency organization, equipment and evacuation routes pertinent to the process trenches during remediation

  18. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  19. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  20. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  1. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  2. 78 FR 37741 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Science.gov (United States)

    2013-06-24

    ... deliver: Marty Robin, Office of Air Planning (AIR- 2), U.S. Environmental Protection Agency Region 9, 75... INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9... statute precludes a State from implementing such measures before they are triggered. See, e.g., LEAN v...

  3. Airspace Integration Plan for Unmanned Aviation

    National Research Council Canada - National Science Library

    2004-01-01

    The Office of the Secretary of Defense Airspace Integration Plan for Unmanned Aviation outlines the key issues that must be addressed to achieve the goal of safe, routine use of the National Airspace System (NAS...

  4. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  5. 76 FR 51266 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... which was selected in the ROD. The SDs hired M&S Ingenieria y Ciencia Asociados who prepared remedial... approved the Remedial Action Work Plan and M&S Ingenieria y Ciencia Asociados as the Settling Defendants...

  6. Integrated sustainable development and energy resource planning

    OpenAIRE

    Virgiliu NICULA

    2011-01-01

    Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...

  7. Hydrologic modeling as a tool for land management and contingency planning in the Calcasieu Sabine Basin. Volume 1

    International Nuclear Information System (INIS)

    Myers, J.; Meselhe, E.; Kheiashy, K.; Miller, R.; Douglas, C.

    2007-01-01

    The Calcasieu-Sabine Basin in southwest Louisiana contains approximately 126,518 hectares of wetlands, consisting of fresh marsh, intermediate marsh, brackish marsh and saline marsh. The hydrodynamics of the basin involves a combination of estuarine processes such as saltwater intrusion, response to water level fluctuations at an open boundary and lake dynamics. The basin is also affected by deep ship channels. As such, a robust, flexible and efficient numerical model is needed to incorporate all of these processes in an operational program. This study developed a hydrodynamic and salinity model for a portion of the basin that includes the lakes and marshes for the purpose of land management and contingency planning. The newly developed finite-difference hydrodynamic and salinity model is a combination of 1 and 2 dimensional computations and is intended for land, wildlife and habitat management. It can be used as a coastal restoration tool to evaluate the effectiveness of future and ongoing coastal restoration projects. The model was calibrated and validated against field measurements. It was shown to produce accurate simulations of the complex flow patterns of the Calcasieu-Sabine Basin along with information on salinity, water level fluctuations, velocities and discharges throughout the main channels and open water bodies within the area. It was concluded that the model provides a very useful planning and adaptive management tool to improve the understanding of the complex hydrology and salinity circulation pattern within the system. 5 refs., 4 tabs., 9 figs

  8. Healthcare succession planning: an integrative review.

    Science.gov (United States)

    Carriere, Brian K; Muise, Melanie; Cummings, Greta; Newburn-Cook, Chris

    2009-12-01

    Succession planning is a business strategy that has recently gained attention in the healthcare literature, primarily because of nursing shortage concerns and the demand for retaining knowledgeable personnel to meet organizational needs. Little research has been conducted in healthcare settings that clearly defines best practices for succession planning frameworks. To effectively carry out such organizational strategies during these challenging times, an integrative review of succession planning in healthcare was performed to identify consistencies in theoretical approaches and strategies for chief nursing officers and healthcare managers to initiate. Selected articles were compared with business succession planning to determine whether healthcare strategies were similar to best practices already established in business contexts. The results of this integrative review will aid leaders and managers to use succession planning as a tool in their recruitment, retention, mentoring, and administration activities and also provide insights for future development of healthcare succession planning frameworks.

  9. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  10. Temporal contingency

    Science.gov (United States)

    Gallistel, C.R.; Craig, Andrew R.; Shahan, Timothy A.

    2015-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. PMID:23994260

  11. Temporal contingency.

    Science.gov (United States)

    Gallistel, C R; Craig, Andrew R; Shahan, Timothy A

    2014-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. Copyright © 2013 Elsevier B.V. All rights reserved.

  12. Planning and management for health in periods of economic stringency and instability: a contingency approach.

    Science.gov (United States)

    van der Werff, A

    1986-01-01

    The mid-1970s marked the end of the longest period of uninterrupted economic growth in history, and initiated in Europe--and other parts of the world--a period of economic stagnation and instability. Along with the prosperity explosion of the past, the pattern of health problems has changed and is still changing. Moreover, the demand for health care has kept on rising, without much improvement of health status in general. Thus, there is a critical need to rethink policies, and to ensure that future changes occur within the limits of shrinking resources and the allotted time-span. In particular, the change in priorities envisaged by the Health for All 2000 (HFA 2000) strategies will need to take place against the background of an ageing population, social instability, and continuing development of new lifestyles and persistent economic scarcity. It is by analysing that background that this article seeks to make recommendations as to how health planning and management might successfully cope with the policy reorientation of the HFA 2000 strategy. The structure of this article is as follows. Firstly, the changes taking place in planning conditions will be reviewed, and form the basis of a framework for subsequent analysis of the planning environment. Following this framework, some of the conflicts likely to be faced in planning and management will be discussed, many of which are the consequence of economic stringency and instability. Also the requirements for an improvement of the effectiveness and efficiency of planning will be identified. Finally, a limited number of approaches to planning will be considered, for their appropriateness to the present-day economic circumstances. The point of view elucidated throughout is that there is no single solution which is 'best' under all circumstances. The conclusion, rather, is that the selection of particular theory or method of planning and management should depend both on the objectives of the decision maker and on the

  13. 78 FR 33276 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-06-04

    ..., including learning deficits, lowered intelligence, and adverse effects on behavior. The Integrated Exposure... hazards in the community. Use of mass media (television, radio, internet, print media, etc.) to distribute...

  14. 75 FR 27464 - Special Reporting, Analysis and Contingent Resolution Plans at Certain Large Insured Depository...

    Science.gov (United States)

    2010-05-17

    ... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...

  15. Integrated Planning: Why is it so hard?

    International Nuclear Information System (INIS)

    Hesser, A.

    1994-01-01

    In this paper, the Manager of Planning integration at DOE-Richland and the Program Manager for Hanford Mission Planning at Pacific Northwest Laboratory and Westinghouse Hanford Company describe some of the reasons why integrated planning is so hard and what can be done to correct the situation. The authors use experiences from the last three years at Hanford to illustrate some of the difficulties in site integrated planning. The authors argue that integrated planning was not a major part of the previous diverse Site missions, but the change of mission has not resulted in a corresponding change of attitude about the need for such planning. Moreover, the DOE-RL staff is not structured or manned for planning, and a site perspective is the exception, rather than the norm. Contributing to this situation is the compartmentalization of funding and decision making and the diffusion of responsibility. The decision-making process at DOE sites is often not clear because of the evolving role of stakeholders, and agencies outside the DOE, especially regulators, are co-decision makers. The regulatory process and the requirements of environmental impact statements contribute to the diffusion of authority

  16. A template for integrated community sustainability planning.

    Science.gov (United States)

    Ling, Christopher; Hanna, Kevin; Dale, Ann

    2009-08-01

    This article describes a template for implementing an integrated community sustainability plan. The template emphasizes community engagement and outlines the components of a basic framework for integrating ecological, social and economic dynamics into a community plan. The framework is a series of steps that support a sustainable community development process. While it reflects the Canadian experience, the tools and techniques have applied value for a range of environmental planning contexts around the world. The research is case study based and draws from a diverse range of communities representing many types of infrastructure, demographics and ecological and geographical contexts. A critical path for moving local governments to sustainable community development is the creation and implementation of integrated planning approaches. To be effective and to be implemented, a requisite shift to sustainability requires active community engagement processes, political will, and a commitment to political and administrative accountability, and measurement.

  17. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  18. Capital planning for clinical integration.

    Science.gov (United States)

    Grauman, Daniel M; Neff, Gerald; Johnson, Molly Martha

    2011-04-01

    When assessing the financial implications of a physician alignment and clinical integration initiative, a hospital should measure the initiative's potential ROI, perhaps best using a combination of net present value and payback period. The hospital should compare its own historical and projected performance with rating agency median benchmarks for key financial indicators of profitability, debt service, capital and cash flow, and liquidity. The hospital should also consider potential indirect benefits, such as retained outpatient/ancillary revenue, increased inpatient revenue, improved cost control, and improved quality and reporting transparency.

  19. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  20. 241-CX-70, 241-CX-71, and 241-CX-72 underground storage tanks at the strontium semiworks facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the underground storage tanks at the Strontium Semiworks Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. Radioactive material is contained in three underground storage tanks: 241-CX-70, 241-CX-71, and 241-CX-72. Tank 241-CX-70 has been emptied, except for residual quantities of waste, and has been classified as an elementary neutralization tank under the RCRA. Tanks 241-CX-71 and 241-CX-72 contain radioactive and Washington State-only dangerous waste material, but do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the Strontium Semiworks Facility

  1. Risk management and contingency planning for year 2000 - key business decisions for the success of an organization

    International Nuclear Information System (INIS)

    McNeil, J.L.

    1998-01-01

    Factors that transformed Y2K, initially considered as primarily a computer problem, into a business problem are outlined. For example, many organizations have prioritized their inventory of information technology (IT) systems, but few have prioritized their suppliers or customers, or have even thought of what will happen if they cannot get products, or cannot get paid by their customers. Estimates at this time reveal that approximately 30 per cent of businesses will not be operational. This presents a significant risk to any organisation's bottom line. Add to this the status of the world as a whole, where other than about 12 major countries, the majority has not even began to remediate their Y2K problems, and we begin to get a true picture of the potential of major communications problems with subsidiaries, partners or suppliers. Consideration of these factors make it easy to see how Y2K is potentially a major business problem. Because of these risks, it is strongly urged that organizations perform risk management and contingency planning. An example of a risk management approach is presented

  2. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  3. National conference on integrated resource planning: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  4. National conference on integrated resource planning: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  5. Resource Estimations in Contingency Planning for Foot-And-Mouth Disease

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of euros due to the closure of export markets. This is important....... It was estimated that the need for personnel would peak on day 7 with a requirement of approximately 170 veterinarians, 70 technicians and 45 administrative staff. However, the need for personnel in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection...

  6. Contingency planning and emergency response in construction activities: Training the construction worker

    International Nuclear Information System (INIS)

    Jones, E.

    1987-01-01

    Construction activities have the potential for environmental and/or health impacts at Oak Ridge National Laboratory (ORNL) particularly as site cleanup and restoration plans are initiated. ORNL has instituted special training for all construction workers and related contractors. Individuals learn how construction activities at ORNL can potentially have adverse effects on the environment and their health, and to learn how to respond to potential chemical and radiation hazards. Workers are given a review of basic information on radiation and chemicals in a framework that emphasizes the situations in which workers or the environment may be exposed to potential risk. Specific instructions are presented on what to do when contamination is suspected, with identification of emergency procedures and response personnel. 5 refs., 1 fig

  7. Flexible integration of path-planning capabilities

    Science.gov (United States)

    Stobie, Iain C.; Tambe, Milind; Rosenbloom, Paul S.

    1993-05-01

    Robots pursuing complex goals must plan paths according to several criteria of quality, including shortness, safety, speed and planning time. Many sources and kinds of knowledge, such as maps, procedures and perception, may be available or required. Both the quality criteria and sources of knowledge may vary widely over time, and in general they will interact. One approach to address this problem is to express all criteria and goals numerically in a single weighted graph, and then to search this graph to determine a path. Since this is problematic with symbolic or uncertain data and interacting criteria, we propose that what is needed instead is an integration of many kinds of planning capabilities. We describe a hybrid approach to integration, based on experiments with building simulated mobile robots using Soar, an integrated problem-solving and learning system. For flexibility, we have implemented a combination of internal planning, reactive capabilities and specialized tools. We illustrate how these components can complement each other's limitations and produce plans which integrate geometric and task knowledge.

  8. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    Science.gov (United States)

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  9. Integrating components of culture in curriculum planning

    Directory of Open Access Journals (Sweden)

    Grace Chibiko Offorma

    2016-05-01

    Full Text Available Culture is seen from different perspectives but the focus of this paper is on the totality of people’s way of life; those things that bind the society together. In this paper, the key concepts of curriculum, culture, and curriculum planning are explained. The components of culture, namely, universals of culture, specialties of culture and alternatives of culture are discussed. Integration is briefly presented and how to integrate culture in the curriculum planning is discussed. This can be done through situational analysis to identify the necessary cultural contents to be included or integrated in the curriculum. Different modes of delivery to be used are role play, dramatization, collaboration, field trips, games and simulation, and other interactive modes that make learning meaningful and worthwhile.

  10. Planning urban megaprojects in the Gulf: The international consultancy firms in urban planning between global and contingent

    Directory of Open Access Journals (Sweden)

    Oula Aoun

    2016-06-01

    Full Text Available Driven by globalization and market openings, many architecture and engineering firms have become global. By focusing on the urban megaprojects in the Gulf, a particular cultural and political context, this paper argues that such firms have a major role in the rapid urban transformation of Gulf countries and act as transfer agents of an international knowledge in the urban planning domain. However, the transfer is adapted by several context-related characteristics, such as local governance, urban knowledge, and regulatory framework. This paper explores the procedural adaptation of these firms to the Gulf Cooperation Council (GCC in terms of internal structure, methodology, adopted tools, and interaction with the context. The level of learning that results from this transfer is also investigated.

  11. An Integrated Extravehicular Activity Research Plan

    Science.gov (United States)

    Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott

    2016-01-01

    Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human

  12. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  13. Practical education in family planning: integrative review

    Directory of Open Access Journals (Sweden)

    Creusa Ferreira da Silva

    2017-07-01

    Full Text Available Objectives: To identify educational practices in family planning, facilitating factors, difficulties and resulting impacts. Method: This is an integrative literature review, using the three descriptors: "family planning", "health education" and "contraception"; In the databases of the Scientific Electronic Library Online (SciELO, Latin American and Caribbean Literature in Health Sciences (LILACS and Nursing Database (BDENF, were searched in January and February 2016. Results: Regarding the accomplishment of educational practices, most of the studies pointed out its accomplishment. The difficulties and facilitators aspects were related to the management of the health service, professional competence and users. Guarantee of family rights and autonomy were the impacts pointed out. Conclusion: The study showed that educational practices in family planning are tools to be encouraged as a guarantee and respect for sexual and reproductive rights. Descriptors: family planning; education in health; contraception.

  14. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  15. Nuclear power programme planning: An integrated approach

    International Nuclear Information System (INIS)

    2001-12-01

    The International Atomic Energy Agency (IAEA) has published material on different policy considerations in the introduction of nuclear power, primarily addressed to top level decision makers in government and industry in Member States. Several Member States and experts recommended to the IAEA to address the aspects of an integrated approach to nuclear power programme planning and to serve as guidance to those countries wishing to embark on a nuclear power programme. As a follow-up, the present publication is primarily intended to serve as guidance for executives and managers in Member States in planning for possible introduction of nuclear power plants in their electricity generating systems. Nuclear power programme planning, as dealt with in this publication, includes all activities that need to be carried out up to a well-founded decision to proceed with a project feasibility study. Project implementation beyond this decision is not in the scope of this publication. Although it is possible to use nuclear energy as a heat source for industrial processes, desalination and other heat applications, it is assumed in this publication that the planning is aimed towards nuclear power for electricity generation. Much of the information given would, however, also be relevant for planning of nuclear reactors for heat production. The publication was prepared within the framework of the IAEA programme on nuclear power planning, implementation and performance as a joint activity of the Nuclear Power Engineering Section and the Planning and Economic Studies Section (Division of Nuclear Power)

  16. Integrated resource planning in Danish electricity supply

    International Nuclear Information System (INIS)

    1994-01-01

    Integrated Resource Planning in Danish Electricity Supply is a development project run by a cooperation of Danish electric power companies. It takes environmental issues, such as energy conservation, into consideration in addition to the European Union's proposal for a directive on the introduction of competition within the common energy market. The concept of integrated resource planning is described as a tool that can be used for a total cost minimization of the activities on the supply side and the demand side, this concept is further elucidated. It is explained that there must be an economic balance between the efforts on both sides and that this will ensure a total cost minimization. Preconditions, related for example to socio-economics, and procedures (step-by-step planning), functional barriers, a definition of roles and international influence and dialogue are also discussed. Satisfaction is expressed for this method of integrated resource planning, yet uncertainty as to the future structure of the free electricity market implies a cautious implementation. (AB)

  17. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  18. Integrated resource planning-concepts and principles

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, S.

    1994-12-31

    The concepts and principles of integrated resource planning (IRP) are outlined. The following topics are discussed: utility opportunities and methodologies, application considerations, ambitious energy-efficient programs, the future of IRP, three methods to study resource alternatives, the load adjustment method, simultaneous optimization, static analysis, utility profile data, load forecasts and shapes, load data, conversion, variable costs, external analysis, internal analysis, DSM objectives, supply-side prescreening, DSM screening analysis, DSM evaluation, the IRP process, risk analysis, collaborative planning process, and load shape objectives.

  19. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  20. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2015-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  1. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2011-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  2. Integration of family planning with poverty alleviation.

    Science.gov (United States)

    Peng, P

    1996-12-01

    The Chinese Communist Central Committee and the State Council aim to solve food and clothing problems among impoverished rural people by the year 2000. This goal was a priority on the agenda of the recent October 1996 National Conference on Poverty Alleviation and Development and the 1996 National Conference of the State Family Planning Commission. Poverty is attributed to rapid population growth and underdevelopment. Poverty is concentrated in parts of 18 large provinces. These provinces are characterized by Family Planning Minister Peng as having high birth rates, early marriage and childbearing, unplanned births, and multiple births. Overpopulation is tied to overconsumption, depletion of resources, deforestation, soil erosion, pollution, shortages of water, decreases in shares of cultivated land, degraded grasslands, and general destruction of the environment. Illiteracy in poor areas is over 20%, compared to the national average of 15%. Mortality and morbidity are higher. Family planning is harder to enforce in poor areas. Pilot programs in Sichuan and Guizhou provinces are promoting integration of family planning with poverty alleviation. Several conferences have addressed the integrated program strategies. Experience has shown that poverty alleviation occurs by controlled population growth and improved quality of life. Departments should "consolidate" their development efforts under Communist Party leadership at all levels. Approaches should emphasize self-reliance and public mobilization. The emphasis should be on women's participation in development. Women's income should be increased. Family planning networks at the grassroots level need to be strengthened simultaneously with increased poverty alleviation and development. The government strategy is to strengthen leadership, mobilize the public, and implement integrated programs.

  3. Integrated planning: A baseline development perspective

    International Nuclear Information System (INIS)

    Clauss, L.; Chang, D.

    1994-01-01

    The FEMP Baseline establishes the basis for integrating environmental activity technical requirements with their cost and schedule elements. The result is a path forward to successfully achieving the FERMCO mission. Specific to cost management, the FEMP Baseline has been incorporate into the FERMCO Project Control System (PCS) to provide a time-phased budget plan against which contractor performance is measured with an earned value management system. The result is the Performance Measurement Baseline (PMB), an important tool for keeping cost under control

  4. Brain networks of social action-outcome contingency: The role of the ventral striatum in integrating signals from the sensory cortex and medial prefrontal cortex.

    Science.gov (United States)

    Sumiya, Motofumi; Koike, Takahiko; Okazaki, Shuntaro; Kitada, Ryo; Sadato, Norihiro

    2017-10-01

    Social interactions can be facilitated by action-outcome contingency, in which self-actions result in relevant responses from others. Research has indicated that the striatal reward system plays a role in generating action-outcome contingency signals. However, the neural mechanisms wherein signals regarding self-action and others' responses are integrated to generate the contingency signal remain poorly understood. We conducted a functional MRI study to test the hypothesis that brain activity representing the self modulates connectivity between the striatal reward system and sensory regions involved in the processing of others' responses. We employed a contingency task in which participants made the listener laugh by telling jokes. Participants reported more pleasure when greater laughter followed their own jokes than those of another. Self-relevant listener's responses produced stronger activation in the medial prefrontal cortex (mPFC). Laughter was associated with activity in the auditory cortex. The ventral striatum exhibited stronger activation when participants made listeners laugh than when another did. In physio-physiological interaction analyses, the ventral striatum showed interaction effects for signals extracted from the mPFC and auditory cortex. These results support the hypothesis that the mPFC, which is implicated in self-related processing, gates sensory input associated with others' responses during value processing in the ventral striatum. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  5. Optimal integrated sizing and planning of hubs with midsize/large CHP units considering reliability of supply

    International Nuclear Information System (INIS)

    Moradi, Saeed; Ghaffarpour, Reza; Ranjbar, Ali Mohammad; Mozaffari, Babak

    2017-01-01

    Highlights: • New hub planning formulation is proposed to exploit assets of midsize/large CHPs. • Linearization approaches are proposed for two-variable nonlinear CHP fuel function. • Efficient operation of addressed CHPs & hub devices at contingencies are considered. • Reliability-embedded integrated planning & sizing is formulated as one single MILP. • Noticeable results for costs & reliability-embedded planning due to mid/large CHPs. - Abstract: Use of multi-carrier energy systems and the energy hub concept has recently been a widespread trend worldwide. However, most of the related researches specialize in CHP systems with constant electricity/heat ratios and linear operating characteristics. In this paper, integrated energy hub planning and sizing is developed for the energy systems with mid-scale and large-scale CHP units, by taking their wide operating range into consideration. The proposed formulation is aimed at taking the best use of the beneficial degrees of freedom associated with these units for decreasing total costs and increasing reliability. High-accuracy piecewise linearization techniques with approximation errors of about 1% are introduced for the nonlinear two-dimensional CHP input-output function, making it possible to successfully integrate the CHP sizing. Efficient operation of CHP and the hub at contingencies is extracted via a new formulation, which is developed to be incorporated to the planning and sizing problem. Optimal operation, planning, sizing and contingency operation of hub components are integrated and formulated as a single comprehensive MILP problem. Results on a case study with midsize CHPs reveal a 33% reduction in total costs, and it is demonstrated that the proposed formulation ceases the need for additional components/capacities for increasing reliability of supply.

  6. Automated radiotherapy treatment plan integrity verification

    Energy Technology Data Exchange (ETDEWEB)

    Yang Deshan; Moore, Kevin L. [Department of Radiation Oncology, School of Medicine, Washington University in Saint Louis, St. Louis, Missouri 63110 (United States)

    2012-03-15

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

  7. Automated radiotherapy treatment plan integrity verification

    International Nuclear Information System (INIS)

    Yang Deshan; Moore, Kevin L.

    2012-01-01

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

  8. Study of the Model of Activating Contingency Plans within Disruptive Incidents by Stages%突发事件下分阶段启动应急预案模型研究

    Institute of Scientific and Technical Information of China (English)

    于辉; 江智慧

    2011-01-01

    经前期处置下,研究管理者面对突发事件应该何时启动前期处置方案和应急预案的问题.在完全没有突发事件持续时阎信息的条件下,利用局内决策理论与方法构建了企业何时启动前期处置方案和应急预案的分阶段启动模型,并利用"竞争比"说明该方案的有效性.在此基础上,进一步通过数值分析表明分阶段启动应急预案的重要意义.%The increased number of natural disasters has disrupted social and economic progress. Minimizing the impact of these disasters can bring stability to society. Emergency response systems have played an important role in achieving this goal. Since the "SARS" crisis in the year 2003, China has begun to focus on building emergency response systems. A national contingency plan system was established in 2004 according to the "Classification" rule. China initially formed a main emergency plan system,constituted by national overall emergency response plans, specific contingency plans, department emergency plans, local emergency plans, and contingency plans for enterprises with large-scale activities.Existing literature has focused on the importance of contingency plans, the assessment of contingency plans, and approaches to improving emergency preparedness. Few studies have addressed problems associated with the activation of contingency plans when the public administration is disrupted by natural disasters. This paper investigates how managers activate contingency plans at the predisposal stage and potential problems that may arise from disruption by natural disasters at this stage. Case studies are conducted and our analysis results show that activating contingency plans at the pre-disposition stage is effective at dealing with public crises caused by natural disasters. A mathematical model is constructed to provide information on when to activate contingency plans in different phases.Decision theories and methods are used to help propose an

  9. Renewable energy and integrated resource planning

    International Nuclear Information System (INIS)

    Porter, K.L.

    1992-01-01

    Integrated resource planning, or IRP, is a new means of comparing resource choices for electric and gas utilities. Since its inception in 1986, at least 15 states have implemented IRP, and more are considering adopting IRP or have limited IRP processes in place. Some of the characteristics of IRP, such as increased public participation and an expanded analysis of the costs and benefits of energy resources, can contribute to addressing some of the technical and market barriers that hinder the increased deployment of renewable energy technologies. This paper looks at the status of some of these issues

  10. Integrated Nuclear Security Support Plan (INSSP)

    International Nuclear Information System (INIS)

    Moore, G.M.

    2010-01-01

    Integrated Nuclear Security Support Plan (INSSP) purposes the framework for a comprehensive approach to addressing specific national security needs. It provides means for coordinating nuclear security assistance to member states. Identifies responsible parties for completion of nuclear security activities which are necessary to build sustainable nuclear security programs. International Atomic Energy Agency INSSP development process is based on findings and recommendations from a range of nuclear security missions and other information needs assessments. Takes into account of the ongoing work activities of other bilateral assistance.

  11. Integrating ALARA into work planning and organization

    International Nuclear Information System (INIS)

    Croft, J.R.; Robb, J.D.

    1993-01-01

    This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs

  12. Integration of strategic environmental assessment in spatial planning

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation.......The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation....

  13. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  14. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  15. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  16. Integrated test plan for directional boring

    International Nuclear Information System (INIS)

    Volk, B.W.

    1993-01-01

    This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department of Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing

  17. Ghana's Integrated Nuclear Security Support Plan

    International Nuclear Information System (INIS)

    Dahlstrom, Danielle

    2013-01-01

    At the Korle Bu Teaching Hospital outside Accra, Pearl Lovelyn Lawson checks the records of the next patient to undergo radiotherapy and adjusts the dose settings of the teletherapy machine. It is business as usual at the facility that treats over fifty patients each day. But Lawson's routine now includes additional procedures to ensure that the highly radioactive cobalt-60 source located inside the machine remains secure. Nuclear security devices and systems such as double locks, motion sensors, and cameras that transmit images to a central alarm system have been installed to ensure that the source cannot be stolen, the facility sabotaged, or unauthorized access gained. At Korle Bu physical protection measures were upgraded as part of Ghana's Integrated Nuclear Security Support Plan (INSSP). Preventing, detecting and responding to criminal acts like the theft or illegal transfer of a radioactive source, is an international priority that could be addressed through an INSSP. As one of its key nuclear security services, the IAEA assists Member States in drafting such plans. An INSSP is developed jointly with the Member State, using a holistic approach to nuclear security capacity building. It reinforces the primary objective of a State's nuclear security regime to protect people, society, and the environment from the harmful consequences of a nuclear security event. Addressing five components - the legal and regulatory framework, prevention, detection, and sustainability - the jointly developed plan identifies the needs, responsible entities and organizations within the State, as well as the timeframe for the implementation of agreed nuclear security related activities. Ghana's INSSP, tailored to its specific needs, is based on findings and recommendations from advisory service missions carried out in Ghana, including an International Nuclear Security Advisory Service mission and an International Physical Protection Advisory Service mission. Ghana's INSSP was

  18. Integration and test planning patterns in different organizations

    NARCIS (Netherlands)

    Jong, de I.S.M.; Boumen, R.; Mortel - Fronczak, van de J.M.; Rooda, J.E.; Tretmans, J.

    2007-01-01

    Planning an integration and test phase is often done by experts in the visited organizations. These experts have a thorough knowledge about the system, integration and testing and the business drivers of an organization. An integration and test plan developedfor an airplane is different than the

  19. Contingency proportion systematically influences contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2018-01-01

    In the color-word contingency learning paradigm, each word appears more often in one color (high contingency) than in the other colors (low contingency). Shortly after beginning the task, color identification responses become faster on the high-contingency trials than on the low-contingency trials-the contingency learning effect. Across five groups, we varied the high-contingency proportion in 10% steps, from 80% to 40%. The size of the contingency learning effect was positively related to high-contingency proportion, with the effect disappearing when high contingency was reduced to 40%. At the two highest contingency proportions, the magnitude of the effect increased over trials, the pattern suggesting that there was an increasing cost for the low-contingency trials rather than an increasing benefit for the high-contingency trials. Overall, the results fit a modified version of Schmidt's (2013, Acta Psychologica, 142, 119-126) parallel episodic processing account in which prior trial instances are routinely retrieved from memory and influence current trial performance.

  20. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    ...) in an effort to determine the size and extent of contractor support, and how plans for and the organization and execution of contingency contracting activities might be improved so that Contingency...

  1. Figure/ground analogy for integrated sustainability & planning

    CSIR Research Space (South Africa)

    Beyers, C

    2006-12-01

    Full Text Available This article proposes a figure ground analogy as alternative way of conceptually integrating sustainability and planning. Within this framework planners are challenged to creatively consider planning practice and thought against a background...

  2. Visual Sample Plan (VSP) - FIELDS Integration

    Energy Technology Data Exchange (ETDEWEB)

    Pulsipher, Brent A.; Wilson, John E.; Gilbert, Richard O.; Hassig, Nancy L.; Carlson, Deborah K.; Bing-Canar, John; Cooper, Brian; Roth, Chuck

    2003-04-19

    Two software packages, VSP 2.1 and FIELDS 3.5, are being used by environmental scientists to plan the number and type of samples required to meet project objectives, display those samples on maps, query a database of past sample results, produce spatial models of the data, and analyze the data in order to arrive at defensible decisions. VSP 2.0 is an interactive tool to calculate optimal sample size and optimal sample location based on user goals, risk tolerance, and variability in the environment and in lab methods. FIELDS 3.0 is a set of tools to explore the sample results in a variety of ways to make defensible decisions with quantified levels of risk and uncertainty. However, FIELDS 3.0 has a small sample design module. VSP 2.0, on the other hand, has over 20 sampling goals, allowing the user to input site-specific assumptions such as non-normality of sample results, separate variability between field and laboratory measurements, make two-sample comparisons, perform confidence interval estimation, use sequential search sampling methods, and much more. Over 1,000 copies of VSP are in use today. FIELDS is used in nine of the ten U.S. EPA regions, by state regulatory agencies, and most recently by several international countries. Both software packages have been peer-reviewed, enjoy broad usage, and have been accepted by regulatory agencies as well as site project managers as key tools to help collect data and make environmental cleanup decisions. Recently, the two software packages were integrated, allowing the user to take advantage of the many design options of VSP, and the analysis and modeling options of FIELDS. The transition between the two is simple for the user – VSP can be called from within FIELDS, automatically passing a map to VSP and automatically retrieving sample locations and design information when the user returns to FIELDS. This paper will describe the integration, give a demonstration of the integrated package, and give users download

  3. Integrated waste plan for Chalk River Laboratories

    International Nuclear Information System (INIS)

    McClelland, P.; Bainbridge, I.

    2011-01-01

    The core missions for Chalk River Laboratories (CRL) will involve a complex suite of activities for decades to come, many of these activities resulting in production of some amount of wastes. In order to support the business of the Nuclear Laboratories there is a requirement to responsibly manage the wastes arising from these activities. Capability to develop waste stream pathway scenarios and be able to make informed strategic decisions regarding the various options for waste processing, storage and long-term management (i.e. e nabling facilities ) is necessary to discharge this responsibility in the most cost effective and sustainable manner. A holistic waste management plan integrated with the decommissioning, environmental remediation and operations programs is the desired result such that: - Waste inputs and timings are identified; - Timing of key decisions regarding enabling facilities is clearly identified; and - A defensible decision-making framework for enabling facilities is established, thereby ensuring value for Canadians. The quantities of wastes that require managing as part of the Nuclear Legacy Liabilities Program and AECL operations activities is in the range of 200,000 to 300,000 m 3 , with a yearly increase of several thousand m 3 . This volume can be classified into over thirty distinct waste streams having differing life cycle waste management pathways from generation to disposition. The time phasing of the waste management activities required for these wastes spans several decades and involves a complex array of processes and facilities. Several factors typical of wastes from the development of nuclear technology further complicate the situation. For example, there is considerable variation in the level of detail and format of waste records generated over several decades. Also, wastes were put into storage over several decades without knowledge or consideration of what the final disposition path will be. Prior to proceeding with any major new

  4. Operational antecedents of integrated patient planning in hospitals

    NARCIS (Netherlands)

    Drupsteen, Justin; van der Vaart, T.; van Donk, Dirk

    2016-01-01

    Purpose - Hospitals struggle to integrate the planning from different departments; resulting in unacceptable waiting times for patients. The literature mainly addresses general, organizational factors inhibiting or enabling integration and omits important factors stemming from the care delivery

  5. Supporting teachers' technology integration in lesson plans

    NARCIS (Netherlands)

    Janssen, Noortje

    2017-01-01

    Lesson planning offers rich opportunities for teachers to consider and implement technology in the classroom. This dissertation investigated the design and effectiveness of supplementary information to assist pre-service teachers during the lesson planning process. Based on the Technological,

  6. Data integration for urban transport planning

    NARCIS (Netherlands)

    Huang, Zhendong

    2003-01-01

    Urban transport planning aims at balancing conflicting challenges by promoting more efficient transport systems while reducing negative impacts. The availability of better and more reliable data has not only stimulated new planning methodologies, but also created challenges for efficient data

  7. Integrating hospitals into community emergency preparedness planning.

    Science.gov (United States)

    Braun, Barbara I; Wineman, Nicole V; Finn, Nicole L; Barbera, Joseph A; Schmaltz, Stephen P; Loeb, Jerod M

    2006-06-06

    Strong community linkages are essential to a health care organization's overall preparedness for emergencies. To assess community emergency preparedness linkages among hospitals, public health officials, and first responders and to investigate the influence of community hazards, previous preparation for an event requiring national security oversight, and experience responding to actual disasters. With expert advice from an advisory panel, a mailed questionnaire was used to assess linkage issues related to training and drills, equipment, surveillance, laboratory testing, surge capacity, incident management, and communication. A simple random sample of 1750 U.S. medical-surgical hospitals. Of 678 hospital representatives that agreed to participate, 575 (33%) completed the questionnaire in early 2004. Respondents were hospital personnel responsible for environmental safety, emergency management, infection control, administration, emergency services, and security. Prevalence and breadth of participation in community-wide planning; examination of 17 basic elements in a weighted analysis. In a weighted analysis, most hospitals (88.2% [95% CI, 84.1% to 92.3%]) engaged in community-wide drills and exercises, and most (82.2% [CI, 77.8% to 86.5%]) conducted a collaborative threat and vulnerability analysis with community responders. Of all respondents, 57.3% (CI, 52.1% to 62.5%) reported that their community plans addressed the hospital's need for additional supplies and equipment, and 73.0% (CI, 68.1% to 77.9%) reported that decontamination capacity needs were addressed. Fewer reported a direct link to the Health Alert Network (54.4% [CI, 49.3% to 59.5%]) and around-the-clock access to a live voice from a public health department (40.0% [CI, 35.0% to 45.0%]). Performance on many of 17 basic elements was better in large and urban hospitals and was associated with a high number of perceived hazards, previous national security event preparation, and experience in actual

  8. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  9. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  10. Model for negotiation on contingency plans for distribution of natural gas; Modelo de negociacao para planos de contingencia energetica na area de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Sobral, Marcos Felipe Falcao; Morais, Danielle Costa [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2008-07-01

    The high consumption of Natural Gas (NG), the environmental and economic turbulences that occurred in recent years raises questions about the supply of the product in critical situations. Characteristic factors of natural gas, like the high cost of storage, show the need for the establishment of contingency plans that define what procedures should be adopted in the distribution of Natural Gas or redistribute among consumers in times of restriction of supply, substantial increase on demand or reduction in the ability of supply. These plans aim to define in advance the actions that will be adopted, providing business and consumer segments clear rules indicate the time to search for alternative sources in case of crisis. The current models can not yet address the problem of negotiation for the division of the product following the concepts proposed by the science of trading, making things like proportionality and envy-free are not observed. The aim of this study is to propose a model for distribution of quotas for supply of NG between different consumer segments. The proposed algorithm combines the procedures of Knaster, Steinhaus and Divide the Dollar, seeking an allocation that minimize the feeling of jealousy and provide an equitable distribution. (author)

  11. Contingency Teaching during Close Reading

    Science.gov (United States)

    Fisher, Douglas; Frey, Nancy

    2015-01-01

    12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.

  12. A Contingent Analysis of the Relationship between IS Implementation Strategies and IS Success.

    Science.gov (United States)

    Kim, Sang-Hoon; Lee, Jinjoo

    1991-01-01

    Considers approaches to dealing with user attitudes toward newly implemented information systems (IS), and suggests that behavioral management strategies relevant to IS fall into three categories: (1) empirical/rational; (2) normative/reeducative; and (3) power/coercive, based on "planned change" theories. An integrative contingent model…

  13. Strategic and Operational Plan for Integrating Transcriptomics ...

    Science.gov (United States)

    Plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT; the details are in the attached slide presentation presentation on plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT, given at the OECD meeting on June 23, 2016

  14. Integrated Care Planning for Cancer Patients: A Scoping Review

    Directory of Open Access Journals (Sweden)

    Anum Irfan Khan

    2017-11-01

    Full Text Available Introduction: There has been a growing emphasis on the use of integrated care plans to deliver cancer care. However little is known about how integrated care plans for cancer patients are developed including featured core activities, facilitators for uptake and indicators for assessing impact. Methods: Given limited consensus around what constitutes an integrated care plan for cancer patients, a scoping review was conducted to explore the components of integrated care plans and contextual factors that influence design and uptake. Results: Five types of integrated care plans based on the stage of cancer care: surgical, systemic, survivorship, palliative and comprehensive (involving a transition between stages are described in current literature. Breast, esophageal and colorectal cancers were common disease sites. Multi-disciplinary teams, patient needs assessment and transitional planning emerged as key features. Provider buy-in and training alongside informational technology support served as important facilitators for plan uptake. Provider-level measurement was considerably less robust compared to patient and system-level indicators. Conclusions: Similarities in design features, components and facilitators across the various types of integrated care plans indicates opportunities to leverage shared features and enable a management lens that spans the trajectory of a patient’s journey rather than a phase-specific silo approach to care.

  15. PETROBRAS Transportes (TRANSPETRO) contingency plan system; Metodologia SIE (Sistema Informatizado de Emergencia) aplicada no gerenciamento das contingencias

    Energy Technology Data Exchange (ETDEWEB)

    Berardinelli, Ricardo; Mendonca, Daniela [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil). Coordenacao de Seguranca, Saude e Meio Ambiente de Dutos e Terminais; Morais, Lucia B.; Carvalho, Marcelo Tilio M. de [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Informatica. Grupo de Tecnologia em Computacao Grafica (TECGRAF)

    2005-07-01

    This paper describes the PETROBRAS Transportes Emergency Response System, which was designed to improve the response to emergency situations. The plans are defined based on an evaluation of the organization of the emergency teams, the communication procedures, characterization of the installations, definition of accidental scenarios, environmental sensitivity maps; simulation of oil spill trajectories and dispersion behavior; geographical data of the area surrounding the installations; other conventional data related to the installations, including equipment available and the InfoPAE system. Plans include several scenarios as oil spills, gas, fire, explosion, hazardous materials which can be applied to terminals and pipelines. (author)

  16. 77 FR 12644 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-03-01

    ... (Enforcement Office) will be establishing an electronic submission system to enable covered airlines and... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... complaint reporting system, where covered airlines and airports will submit their required plans. The...

  17. 77 FR 27267 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-05-09

    ... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... , similar to the Department's current disability complaint reporting system, to enable covered U.S. airlines... to use the tarmac delay plan filing system, covered U.S. airlines and airports will need to register...

  18. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  19. Integration of Environmental Planning Into the Army Master Planning Process

    Science.gov (United States)

    1992-10-01

    the issues specific to the later assessment (ETL 1110-3-407, pp 1-9 to 1-10). Under the : estructured master planning process discussed in this report...Lisa~m 0111utHars M143 AMW PRO*b LAMM~e 0)3. AMW uaides, Uso ~ow (M Port RJ." 21719 7%s pubhicaton was repfodaaced on moycled V&Mp. /| / 121 DATEI:

  20. Thevenin Equivalent Method for Dynamic Contingency Assessment

    DEFF Research Database (Denmark)

    Møller, Jakob Glarbo; Jóhannsson, Hjörtur; Østergaard, Jacob

    2015-01-01

    A method that exploits Thevenin equivalent representation for obtaining post-contingency steady-state nodal voltages is integrated with a method of detecting post-contingency aperiodic small-signal instability. The task of integrating stability assessment with contingency assessment is challenged...... by the cases of unstable post-contingency conditions. For unstable postcontingency conditions there exists no credible steady-state which can be used for basis of a stability assessment. This paper demonstrates how Thevenin Equivalent methods can be applied in algebraic representation of such bifurcation...... points which may be used in assessment of post-contingency aperiodic small-signal stability. The assessment method is introduced with a numeric example....

  1. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  2. Tethered Satellite System Contingency Investigation Board

    Science.gov (United States)

    1992-11-01

    The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether

  3. Integrating Family Planning and HIV Services at the Community ...

    African Journals Online (AJOL)

    USER

    Little is known on integrating HIV and family planning (FP) services in community settings. Using a cluster randomized ..... process evaluation data from several studies on facility-based ... PEPFAR blueprint: Creating an AIDS-free generation.

  4. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  5. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  6. Integrating Risk Management and Strategic Planning

    Science.gov (United States)

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  7. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  8. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories

    DEFF Research Database (Denmark)

    Koenen, K.; Uttenthal, Åse; Meindl-Böhmer, A.

    2007-01-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning....... It is essential that these plans are established during ‘peace-time’ and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance...

  9. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  10. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    Energy Technology Data Exchange (ETDEWEB)

    Munger, M.; Bryant, T. [Cook Inlet Regional Citizen' s Advisory Council, Kenai, AK (United States); Haugstad, E.; Kwietniak, J. [Tesora Alaska Petroleum, Kenai, AK (United States); DeCola, E.; Robertson, T. [Nuka Research and Planning Group, Seldovia, AK (United States)

    2006-07-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs.

  11. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    International Nuclear Information System (INIS)

    Munger, M.; Bryant, T.; Haugstad, E.; Kwietniak, J.; DeCola, E.; Robertson, T.

    2006-01-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs

  12. Integrating Planning, Assessment, and Improvement in Higher Education

    Science.gov (United States)

    Sherlock, Barbara J.

    2009-01-01

    Based on Penn State's popular "Innovation Insights" series, this book brings together in one handy reference nearly a decade of tried and true insights into continuous quality improvements in higher education. Their five-step model for integrating planning, assessment, and improvement moves plans off the shelf and into the weekly and daily…

  13. Integration of air quality-related planning processes : report

    International Nuclear Information System (INIS)

    2004-05-01

    Several communities in British Columbia have conducted air quality, greenhouse gas, or community energy management plans. This report explored the possibility of integrating 3 community-based air quality-related planning processes into a single process and evaluated the use of these 3 processes by local governments and First Nations in identifying and addressing air quality-related objectives, and determined to what extent they could be integrated to achieve planning objectives for air quality, greenhouse gas emissions, and energy supply and conservation. The lessons learned from 9 case studies in British Columbia were presented. The purpose of the case studies was to examine how communities handled emissions and energy related inventory and planning work, as well as their experiences with, or considerations for, an integrated process. The lessons were grouped under several key themes including organization and stakeholder involvement; messaging and focus; leadership/champions; and resources and capacity. The report also outlined a framework for an integrated planning process and provided recommendations regarding how an integrated or complementary process could be performed. A number of next steps were also offered for the provincial government to move the concept of an integrated process forward with the assistance of other partners. These included identifying the resources required to support communities engaging in an integrated process as well as discussing the series of options for provincial support with key stakeholders. refs., tabs., figs

  14. Costs of integrating economics and conservation planning.

    Science.gov (United States)

    Arponen, Anni; Cabeza, Mar; Eklund, Johanna; Kujala, Heini; Lehtomäki, Joona

    2010-10-01

    Recent literature on systematic conservation planning has focused strongly on economics. It is a necessary component of efficient conservation planning because the question is about effective resource allocation. Nevertheless, there is an increasing tendency toward economic factors overriding biological considerations. Focusing too narrowly on economic cost may lead us back toward solutions resembling those obtained by opportunistic choice of areas, the avoidance of which was the motivation for development of systematic approaches. Moreover, there are many overlooked difficulties in incorporating economic considerations reliably into conservation planning because available economic data and the free market are complex. For instance, economies based on free markets tend to be shortsighted, whereas biodiversity conservation aims far into the future. Although economic data are necessary, they should not be relied on too heavily or considered separately from other sociopolitical factors. We suggest focusing on development of more-comprehensive ecological-economic modeling, while not forgetting the importance of purely biological analyses that are needed as a point of reference for evaluating conservation outcomes. © 2010 Society for Conservation Biology.

  15. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  16. Demand side integration aspects in active distribution planning

    DEFF Research Database (Denmark)

    Silvestro, Federico; Baitch, Alex; Pilo, Fabrizio

    2013-01-01

    will be implemented in practice? How will regulatory frameworks and connection agreements evolve to support ADSs? The present work provides some information about the closer and closer integration between network planning and Demand Side Integration that is foreseen in the future and shows the necessity to develop...

  17. 25 CFR 39.501 - What is an emergency or unforeseen contingency?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...

  18. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  19. Optimal planning of integrated multi-energy systems

    DEFF Research Database (Denmark)

    van Beuzekom, I.; Gibescu, M.; Pinson, Pierre

    2017-01-01

    In this paper, a mathematical approach for the optimal planning of integrated energy systems is proposed. In order to address the challenges of future, RES-dominated energy systems, the model deliberates between the expansion of traditional energy infrastructures, the integration...... and sustainability goals for 2030 and 2045. Optimal green- and brownfield designs for a district's future integrated energy system are compared using a one-step, as well as a two-step planning approach. As expected, the greenfield designs are more cost efficient, as their results are not constrained by the existing...

  20. Double-shell tank waste transfer facilities integrity assessment plan

    International Nuclear Information System (INIS)

    Hundal, T.S.

    1998-01-01

    This document presents the integrity assessment plan for the existing double-shell tank waste transfer facilities system in the 200 East and 200 West Areas of Hanford Site. This plan identifies and proposes the integrity assessment elements and techniques to be performed for each facility. The integrity assessments of existing tank systems that stores or treats dangerous waste is required to be performed to be in compliance with the Washington State Department of Ecology Dangerous Waste Regulations, Washington Administrative Code WAC-173-303-640 requirements

  1. Resource integrated planning through fuzzy techniques

    Energy Technology Data Exchange (ETDEWEB)

    Haddad, J; Torres, G Lambert [Escola Federal de Engenharia de Itajuba, MG (Brazil); Jannuzzi, G de M. [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica

    1994-12-31

    A methodology for decision-making in studies involving energy saving by using the Fuzzy Sets Theory is presented. The Fuzzy Sets Theory permits to handle and to operate exact and non-exact propositions, that is, to incorporate both numerical data (exact) and the knowledge of either the expert or the analyst (inexact). The basic concepts of this theory are presented with its main operations and properties. Following, some criteria and technical-economical parameters used in the planning of the generation expansion are shown and, finally, the Theory of the Fuzzy Sets is applied aiming to establish electrical power generation and conservation strategies considering the power demand. (author) 6 refs., 8 tabs.

  2. RELAP-7 and PRONGHORN Initial Integration Plan

    Energy Technology Data Exchange (ETDEWEB)

    J. Ortensi; D. Andrs; A.A. Bingham; R.C. Martineau; J.W. Peterson

    2012-05-01

    Modern nuclear reactor safety codes require the ability to solve detailed coupled neutronicthermal fluids problems. For larger cores, this implies fully coupled 3-D spatial dynamics with appropriate feedback models that can provide enough resolution to accurately compute core heat generation and removal during steady and unsteady conditions. The reactor analyis code PRONGHORN is being coupled to RELAP-7 as a first step to extend RELAP's current capabilities. This report details the mathematical models, the type of coupling, and the testing that will be used to produce an integrated system. RELAP-7 is a MOOSE-based application that solves the continuity, momentum, and energy equations in 1-D for a compressible fluid. The pipe and joint capabilities enable it to model parts of the PCU system. The PRONGHORN application, also developed on the MOOSE infrastructure, solves the coupled equations that define the neutron diffusion, fluid flow, and heat transfer in a 3-D core model. Initially, the two systems will be loosely coupled to simplify the transition towards a more complex infrastructure. The integration will be tested with the OECD/NEA MHTGR-350 Coupled Neutronics-Thermal Fluids benchmark model.

  3. Presentation planning using an integrated knowledge base

    Science.gov (United States)

    Arens, Yigal; Miller, Lawrence; Sondheimer, Norman

    1988-01-01

    A description is given of user interface research aimed at bringing together multiple input and output modes in a way that handles mixed mode input (commands, menus, forms, natural language), interacts with a diverse collection of underlying software utilities in a uniform way, and presents the results through a combination of output modes including natural language text, maps, charts and graphs. The system, Integrated Interfaces, derives much of its ability to interact uniformly with the user and the underlying services and to build its presentations, from the information present in a central knowledge base. This knowledge base integrates models of the application domain (Navy ships in the Pacific region, in the current demonstration version); the structure of visual displays and their graphical features; the underlying services (data bases and expert systems); and interface functions. The emphasis is on a presentation planner that uses the knowledge base to produce multi-modal output. There has been a flurry of recent work in user interface management systems. (Several recent examples are listed in the references). Existing work is characterized by an attempt to relieve the software designer of the burden of handcrafting an interface for each application. The work has generally focused on intelligently handling input. This paper deals with the other end of the pipeline - presentations.

  4. Planning for an Integrated Research Experiment

    International Nuclear Information System (INIS)

    Barnard, J.J.; Ahle, L.E.; Bangerter, R.O.; Bieniosek, F.M.; Celata, C.M.; Faltens, A.; Friedman, A.; Grote, D.P.; Haber, I.; Henestroza, E.; Kishek, R.A.; Hoon, M.J.L. de; Karpenko, V.P.; Kwan, J.W.; Lee, E.P.; Logan, B.G.; Lund, S.M.; Meier, W.R.; Molvik, A.W.; Sangster, T.C.; Seidl, P.A.; Sharp, W.M.

    2000-01-01

    The authors describe the goals and research program leading to the Heavy Ion Integrated Research Experiment (IRE). They review the basic constraints which lead to a design and give examples of parameters and capabilities of an IRE. We also show design tradeoffs generated by the systems code IBEAM. A multi-pronged Phase 1 research effort is laying the groundwork for the Integrated Research Experiment. Experiment, technology development, theory, simulation, and systems studies are all playing major roles in this Phase I research. The key research areas are: (1) Source and injector (for investigation of a high brightness, multiple beam, low cost injector); (2) High current transport (to examine effects at full driver-scale line charge density, including the maximization of the beam filling-factor and control of electrons); (3) Enabling technology development (low cost and high performance magnetic core material, superconducting magnetic quadrupole arrays, insulators, and pulsers); and (4) Beam simulations and theory (for investigations of beam matching, specification of accelerator errors, studies of emittance growth, halo, and bunch compression, in the accelerator, and neutralization methods, stripping effects, spot size minimization in the chamber); and (5) Systems optimization (minimization of cost and maximization of pulse energy and beam intensity). They have begun the process of designing, simulating, and optimizing the next major heavy-ion induction accelerator, the IRE. This accelerator facility will, in turn, help provide the basis to proceed to the next step in the development of IFE as an attractive source of fusion energy

  5. Exercise ASKARI SERPENT: enabling clinical data collection during exercises and operations to support future contingency planning and assurance of category-based reporting systems.

    Science.gov (United States)

    Parsons, Iain T; Wheatley, R J; Carter, P

    2016-02-01

    Exercise ASKARI SERPENT (Ex AS) is a British Army exercise that provides primary healthcare (PHC) to Kenyan civilians in support of local health authorities. It is conducted in partnership with the Kenya Defence Force Medical Services (KDFMS). Accurate epidemiological data is critical in planning the exercise and for any future short-notice contingency operations in similar environments. This paper reports epidemiological data for Ex AS using a novel data collection system. PHC on Ex AS was delivered by trained and validated combat medical technicians (CMTs) using a set of Read-coded protocols. The CMTs were also directly supported and supervised by medical officers and nurses. A total of 3093 consultations were conducted over a 16-day period. Of these, 2707 (87.5%) consultations fell within the remit of the CMT protocols, with only 386 consultations (12.5%) being conducted exclusively by the medical officers or nurses. A Read-coded matrix built on CMT protocols is a simple and useful tool, particularly in civilian populations, for collecting morbidity data with the vast majority of conditions accounted for in the protocols. It is anticipated that such a system can better inform training, manning, medical material and pharmaceutical procurement than current category-based morbidity surveillance systems such as EPINATO (NATO epidemiological data). There is clear advantage to directly linking data capture to treatment algorithms. Accuracy, both in terms of numbers and condition, is likely improved. Data is also captured contemporaneously rather than after indeterminate time. Read coding has the added benefit of being an established electronic standard. In addition, the system would support traditional reporting methods such as EPINATO by providing increased assurance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  6. The economic value of transportation energy contingency planning: An objective model for analyzing the economics of domestic renewable energy for supply augmentation

    Science.gov (United States)

    Shaten, Richard Jay

    1998-12-01

    Petroleum provides 90% of transportation energy needs. Domestic production is decreasing and global demand is increasing. Risk of escalating prices and supply interruptions are compounded by environmental and military externalities and lost opportunities from the failure to develop alternative domestic resources. Within the context of "energy contingency planning" municipalities should evaluate crisis mitigation strategies. Supply augmentation using domestic renewable fuels is proposed to avert future financial liabilities. A method for calculating the economic value of this strategy is demonstrated. An objective function and associated constraints represent the cost of preparing for each of three possible scenarios: status quo, inflationary and crisis. Constraints ensure that municipal fuel needs are met. Environmental costs may be included. Optimal solutions determine the fuel supply mix for each scenario. A 3 x 3 matrix presents the range of actual costs resulting from preparing for each scenario and subsequent three possible outcomes. The distribution of probabilities of the outcomes is applied to the cost matrix and an "expected value" of preparing for each scenario is calculated. An unanticipated crisis outcome results in. The expected value of the cost of preparing for a crisis is cast as an insurance premium against potential economic liability. Policy makers accept the crisis preparation fuel mix if: (a) they agree with the calculated penalty cost, or (b) they accept the burden of the insurance premium. Green Bay Wisconsin was chosen as a sample municipality. Results show that a perceived 10% chance of crisis requires an annual tax of 4.00 per household to avert economic impacts of 50 million. At a perceived 50% chance of crisis preparing for the crisis would begin to save the municipality money.

  7. Buried Waste Integrated Demonstration Strategy Plan

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    1993-02-01

    The Buried Waste Integrated Demonstration (BWID) supports the applied research, development, demonstration, and evaluation of a suite of advanced technologies that form a comprehensive remediation system for the effective and efficient remediation of buried waste. These efforts are identified and coordinated in support of the US Department of Energy (DOE), Environmental Restoration and Waste Management (ERWM) needs and objectives. The present focus of BWID is to support retrieval and ex situ treatment configuration options. Future activities will explore and support containment and stabilization efforts in addition to the retrieval/ex situ treatment options. Long and short term strategies of the BWID are provided. Processes for identifying technological needs, screening candidate technologies for BWID applicability, researching technical issues, field demonstrating technologies, evaluating demonstration results to determine each technology's threshold of capability, and commercializing successfully demonstrated technologies for implementation for environmental restoration also are presented in this report

  8. Towards an Integrated Workload Control (WLC) Concept : The Performance of Due Date Setting Rules in Job Shops with Contingent Orders

    NARCIS (Netherlands)

    Thuerer, Matthias; Stevenson, Mark; Silva, Cristovao; Land, Martin

    2013-01-01

    Workload control (WLC) is a production planning and control concept developed for make-to-order companies. Its customer enquiry management methodology supports due date setting, while its order release mechanism determines when to start production. For make-to-order companies, due date setting is a

  9. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  10. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  11. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    NARCIS (Netherlands)

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  12. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  13. Integrated Transport Planning Framework Involving Combined Utility Regret Approach

    DEFF Research Database (Denmark)

    Wang, Yang; Monzon, Andres; Di Ciommo, Floridea

    2014-01-01

    Sustainable transport planning requires an integrated approach involving strategic planning, impact analysis, and multicriteria evaluation. This study aimed at relaxing the utility-based decision-making assumption by newly embedding anticipated-regret and combined utility regret decision mechanisms...... in a framework for integrated transport planning. The framework consisted of a two-round Delphi survey, integrated land use and transport model for Madrid, and multicriteria analysis. Results show that (a) the regret-based ranking has a similar mean but larger variance than the utility-based ranking does, (b......) the least-regret scenario forms a compromise between the desired and the expected scenarios, (c) the least-regret scenario can lead to higher user benefits in the short term and lower user benefits in the long term, (d) the utility-based, the regret-based, and the combined utility- and regret...

  14. IR. Theory Meets European Union Law. Constitutional Battles, Sovereign Choices & Institutional Contingencies in the Legacy of the European Integration Process

    DEFF Research Database (Denmark)

    Wind, Marlene

    From the point of departure of international relations theory it is not an easy task to come to grips with the European integration process. We are faced with a situation where some of the world's oldest and traditionally most sovereignty-loving nations have surrendered essential parts of their p......From the point of departure of international relations theory it is not an easy task to come to grips with the European integration process. We are faced with a situation where some of the world's oldest and traditionally most sovereignty-loving nations have surrendered essential parts...... of their power to a supranational institution. In order to make sense of this the book employs a constructivist framework. Empirically it focuses on the way in which the Community has transformed from a traditional international regime, based on classical international law, to a semi-federal polity where...

  15. Integrated National Energy Planning (INEP) in developing countries

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    Issues of coordinated energy planning are emphasized, with particular reference to interrelationships among the policies adopted in various energy sub-sectors such as electric power (including hydro, nuclear, geothermal, oil and coal sources), petroleum, natural gas, coal, non-conventional (solar, bio-gas, mini-hydro) and traditional fuels (woodfuel, bagasse or vegetable residue). The scope and objectives of integrated national energy planning, the policy tools available, and constraints particular to the developing countries are discussed next. Section 3.0 outlines how energy planning is carried out, while the problems of implementing the resulting policy conclusions are examined in section 4.0. 5 refs, 4 figs

  16. Integration of LUTI models into sustainable urban mobility plans (SUMPs

    Directory of Open Access Journals (Sweden)

    Nikolaos Gavanas

    2016-06-01

    Full Text Available A literature review indicates that there is an increasing number of Land Use/Transport Interaction (LUTI models being used in policy analysis and support of urban land use, transport and environmental planning. In this context, LUTI models are considered to be useful for the development of scenarios during the preparatory stage of Sustainable Urban Mobility Plans (SUMPs. A SUMP can be defined as a strategic planning framework, proposed by the European Commission, for planning and design of an urban multimodal transport system, which combines multi-disciplinary policy analysis and decision making. The objective of a SUMP is to achieve sustainable urban mobility, i.e. accessibility for all, safety and security, reduction in emissions and energy consumption, efficient and cost-effective transport and an improvement in the urban environment. Based on the overall conceptual and methodological framework of LUTI models (Geurs and van Wee 2004, the scope of the proposed research is to fully integrate a LUTI model into a contemporary transport planning framework and, more specifically, into the SUMP structure. This paper focuses on the configuration of the integration pattern, according to which a LUTI model may evolve and interact with the planning process throughout the eleven elements of the SUMP, as well as the evaluation of the benefits and drawbacks from the implementation of the proposed pattern for the enhancement of SUMP and overall promotion of sustainable urban planning.

  17. Contingent factors affecting network learning

    OpenAIRE

    Peters, Linda D.; Pressey, Andrew D.; Johnston, Wesley J.

    2016-01-01

    To increase understanding of the impact of individuals on organizational learning processes, this paper explores the impact of individual cognition and action on the absorptive capacity process of the wider network. In particular this study shows how contingent factors such as social integration mechanisms and power relationships influence how network members engage in, and benefit from, learning. The use of cognitive consistency and sensemaking theory enables examination of how these conting...

  18. Load Forecasting in Electric Utility Integrated Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-19

    Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

  19. Integrating Gender Issues in Recovery and Reconstruction Planning

    OpenAIRE

    World Bank

    2011-01-01

    This note on integrating gender issues in recovery and reconstruction planning is the fifth in a series of guidance notes on gender issues in Disaster Risk Management (DRM) in East Asia and Pacific region. There are number of key challenges that women face in different elements of post disaster risk reconstruction and recovery. This note addresses the following bottlenecks: a) housing, lan...

  20. Identifying influential factors on integrated marketing planning using information technology

    Directory of Open Access Journals (Sweden)

    Karim Hamdi

    2014-07-01

    Full Text Available This paper presents an empirical investigation to identify important factors influencing integrated marketing planning using information technology. The proposed study designs a questionnaire for measuring integrated marketing planning, which consists of three categories of structural factors, behavioral factors and background factors. There are 40 questions associated with the proposed study in Likert scale. Cronbach alphas have been calculated for structural factors, behavioral factors and background factors as 0.89, 0.86 and 0.83, respectively. Using some statistical test, the study has confirmed the effects of three factors on integrated marketing. In addition, the implementation of Freedman test has revealed that structural factors were the most important factor followed by background factors and behavioral factors.

  1. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  2. Strategy and Portfolio Management Aspects of Integrated Business Planning

    Directory of Open Access Journals (Sweden)

    Peter Jurečka

    2013-03-01

    Full Text Available With ongoing globalization and thereof derived growing competitiveness on most markets, companies are under constant pressure to increase the effectiveness and efficiencies of their operations. This article focuses on one of the core business management processes – on planning, namely on Sales and Operations Planning (S&OP and its latest development stage represented by the concept of Integrated Business Planning (IBP. It aims to extend the traditional concept of S&OP for selected topics from business strategy and portfolio management, which structured inclusion into planning represent one of key factors distinguishing IBP from conventional S&OP. Implementation of IBP, which constitutes significant step towards operational excellence, is applicable for almost all business and thus can be used broadly as effective tool for facing the challenges of economic and financial crisis.

  3. Integrity management and optimization of planning activities from results of the ILI run

    Energy Technology Data Exchange (ETDEWEB)

    Farinas, Jaime [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    Transierra owns and operates the Yacuiba - Rio Grande pipeline (GASYRG), 432 kilometers in length and 32 inches in diameter, which transports natural gas from the fields of San Alberto and San Antonio (southern Bolivia) to the Rio Grande compression station (Santa Cruz), and is part of the gas export system to Brazil. This pipeline system has a sustained capacity to transport 17,6 million of cubic meter per day. Within the Integrity Management Program (IMP) has been developing and implementing activities and techniques that seeking to ensure the technical integrity of the pipeline, from the good practices of the industry, which also get an optimization for the use of resources for inspection, operation and maintenance activities. In response to that goal at the beginning of 2008, it was concluded the baseline of the GASYRG ILI runs, getting a very good stage of both the internal and external condition of the pipeline, found some stables anomalies (manufacturing and construction) which do not affect the safe operation status of the pipeline, in this way, it was appropriate to re-planning the maintenance programs of all facilities and main elements, in order to achieve a balance between safety operation condition of the pipeline and the resources used for these purposes, which means that there is a 'before' and an 'after' regarding to planning and maintenance activities are concerned. All of this re-planning gives us a cost optimization for the main activities in the order of 30%. Additionally there has been a very particular approach to care for and prevent threats related to corrosion, maintaining a stable cathodic protection system, taking into account the presence of interfering elements (crossing with pipelines, power lines, railroads, etc.). Also important steps have been taken regarding to the changing dynamic to the action of third parties, it is part of a specific program for strengthening contingency plans. Concluding the above, the

  4. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  5. Planning principles as integral tool of financial planning implementation at enterprise

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2016-09-01

    Full Text Available The main problems of using financial planning tools, namely its principles, in order to achieve an effective system of financial planning at the enterprise are considered. Planning is an integral part of management and provides achievement of sustainable enterprise development, that is why, effective financial planning is the necessary means of realization of the main objective of the company – profit maximization. It is determined that the principles of financial planning are the objective category of planning science, which serves as a starting fundamental concept that expresses the cumulative effect of a number of laws. In addition, on the base of the aggregation and analysis of planning principles the system of financial planning principles is specified, providing efficient financial planning and control functions use, achievement of the mission and objectives of the economic entity activity management and ensuring of its profitability. The scientific novelty of the research lies in the specification of financial planning principles defining at the enterprise and their semantic characteristics

  6. IMPERA: Integrated Mission Planning for Multi-Robot Systems

    Directory of Open Access Journals (Sweden)

    Daniel Saur

    2015-10-01

    Full Text Available This paper presents the results of the project IMPERA (Integrated Mission Planning for Distributed Robot Systems. The goal of IMPERA was to realize an extraterrestrial exploration scenario using a heterogeneous multi-robot system. The main challenge was the development of a multi-robot planning and plan execution architecture. The robot team consists of three heterogeneous robots, which have to explore an unknown environment and collect lunar drill samples. The team activities are described using the language ALICA (A Language for Interactive Agents. Furthermore, we use the mission planning system pRoPhEt MAS (Reactive Planning Engine for Multi-Agent Systems to provide an intuitive interface to generate team activities. Therefore, we define the basic skills of our team with ALICA and define the desired goal states by using a logic description. Based on the skills, pRoPhEt MAS creates a valid ALICA plan, which will be executed by the team. The paper describes the basic components for communication, coordinated exploration, perception and object transportation. Finally, we evaluate the planning engine pRoPhEt MAS in the IMPERA scenario. In addition, we present further evaluation of pRoPhEt MAS in more dynamic environments.

  7. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  8. Integrating evidence-based interventions into client care plans.

    Science.gov (United States)

    Doran, Diane; Carryer, Jennifer; Paterson, Jane; Goering, Paula; Nagle, Lynn; Kushniruk, Andre; Bajnok, Irmajean; Clark, Carrie; Srivastava, Rani

    2009-01-01

    Within the mental health care system, there is an opportunity to improve patient safety and the overall quality of care by integrating clinical practice guidelines with the care planning process through the use of information technology. Electronic assessment tools such as the Resident Assessment Inventory - Mental Health (RAI-MH) are widely used to identify the health care needs and outcomes of clients. In this knowledge translation initiative, an electronic care planning tool was enhanced to include evidence-based clinical interventions from schizophrenia guidelines. This paper describes the development of a mental health decision support prototype, a field test by clinicians, and user experiences with the application.

  9. Care Plan Improvement in Nursing Homes: An Integrative Review.

    Science.gov (United States)

    Mariani, Elena; Chattat, Rabih; Vernooij-Dassen, Myrra; Koopmans, Raymond; Engels, Yvonne

    2017-01-01

    Care planning nowadays is a key activity in the provision of services to nursing home residents. A care plan describes the residents' needs and the actions to address them, providing both individualized and standardized interventions and should be updated as changes in the residents' conditions occur. The aim of this review was to identify the core elements of the implementation of changes in nursing homes' care plans, by providing an overview of the type of stakeholders involved, describing the implementation strategies used, and exploring how care plans changed. An integrative literature review was used to evaluate intervention studies taking place in nursing homes. Data were collected from PubMed, CINHAL-EBSCO, and PsycINFO. English language articles published between 1995 and April 2015 were included. Data analysis followed the strategy of Knafl and Whittemore. Twenty-six articles were included. The stakeholders involved were professionals, family caregivers, and patients. Only a few studies directly involved residents and family caregivers in the quality improvement process. The implementation strategies used were technology implementation, audit, training, feedback, and supervision. The majority of interventions changed the residents' care plans in terms of developing a more standardized care documentation that primarily focuses on its quality. Only some interventions developed more tailored care plans that focus on individualized needs. Care plans generally failed in providing both standardized and personalized interventions. Efforts should be made to directly involve residents in care planning and provide professionals with efficient tools to report care goals and actions in care plans.

  10. Integrated marketing communication plan : Case company: Dr. Johanna Budwig

    OpenAIRE

    Pham, Van

    2013-01-01

    The study’s research topic is integrated marketing communication and this is a product-oriented thesis. This study is made to create an efficient integrated marketing communication plan for the case company Dr. Johanna Budwig. The main product line in focus is flaxseed oil, which is very healthy and also good in preventing different diseases including cancer. The company home market, Germany, is the target market of the study. The objective set by the company is to increase sales by 10000, wh...

  11. Balanced Scorecard adoption in Portuguese organizations: Contingent and institutional variables La adopción del cuadro de mando integral en organizaciones portuguesas: Variables contingentes e institucionales

    Directory of Open Access Journals (Sweden)

    Lúcia Lima Rodrigues

    2013-09-01

    Full Text Available Purpose: In this article we aim to identify and analyze a set of contingent and institutional variables that can potentially influence the knowledge and the adoption of the Balanced Scorecard (BSC in Portuguese public and private organizations. Design/methodology/approach: Hypotheses were tested using data obtained from a questionnaire sent to 591 public organizations and 549 private organizations in Portugal, with an overall response rate of 31.3%. Findings and Originality/value: The results indicate the association between BSC knowledge and the level of training of employees, and between BSC implementation and conducting training courses. On the other hand, we did not obtain empirical evidence regarding the possible relationship between the BSC implementation and the degree of internal communication, the use of external consultants, questions of "management fads" and the search for legitimacy. Originality/value: In the literature review we did not found bibliographic elements about the contingent and institutional factors that determine the BSC adoption in Portugal, a fact that allowed us to give this study an innovative approach. Moreover, the BSC situation in Portugal has been characterized, doing a comparative study with the results of studies conducted in other countries.Objeto: Este artículo tiene como objetivo identificar y analizar un conjunto de variables contingentes e institucionales que pueden potencialmente influir en el conocimiento e implementación del Cuadro de Mando Integral (CMI en las organizaciones portuguesas pertenecientes al sector público y privado. Diseño/metodología: Para comprobar empíricamente las hipótesis de investigación formuladas hemos recurrido a los datos obtenidos mediante la aplicación de un cuestionario postal a 591 organizaciones públicas y 549 organizaciones privadas  portuguesas, con una tasa de respuesta total del 31,3%. Aportaciones y resultados: Los resultados obtenidos indican la asociaci

  12. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  13. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  14. Organizational factors, planning capacity, and integration challenges constrain provincial planning processes for nutrition in decentralizing Vietnam.

    Science.gov (United States)

    Lapping, Karin; Frongillo, Edward A; Nguyen, Phuong H; Coates, Jennifer; Webb, Patrick; Menon, Purnima

    2014-09-01

    Translating national policies and guidelines into effective action at the subnational level (e.g., province or region) is a prerequisite for ensuring an impact on nutrition. In several countries, including Vietnam, the focus of this paper, this process is affected by the quality of the decentralized process of planning and action. This study examined how provincial planning processes for nutrition occurred in Vietnam during 2009 and 2010. Key goals were to understand variability in processes across provinces, identify factors that influenced the process, and assess the usefulness of the process for individuals involved in planning and action. A qualitative case-study methodology was used. Data were drawn from interviews with 51 government officials in eight provinces. The study found little variability in the planning process among these eight provinces, probably due to a planning process that was predominantly a fiscal exercise within the confines of a largely centralized structure. Respondents were almost unanimous about the main barriers: a top-down approach to planning, limited human capacity for effective planning at subnational levels, and difficulty in integrating actions from multiple sectors. Provincial-level actors were deeply dissatisfied with the nature of their role in the process. Despite the rhetoric to the contrary, too much power is probably still retained at the central level. A strategic multiyear approach is needed to strengthen the provincial planning process and address many of the key barriers identified in this study.

  15. Integration of landslide susceptibility products in the environmental plans

    Science.gov (United States)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  16. Integrated Renewable Hydrogen Utility System (IRHUS) business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This business plan is for a proposed legal entity named IRHUS, Inc. which is to be formed as a subsidiary of Energy Partners, L.C. (EP) of West Palm Beach, Florida. EP is a research and development company specializing in hydrogen proton exchange membrane (PEM) fuel cells and systems. A fuel cell is an engine with no moving parts that takes in hydrogen and produces electricity. The purpose of IRHUS, Inc. is to develop and manufacture a self-sufficient energy system based on the fuel cell and other new technology that produces hydrogen and electricity. The product is called the Integrated renewable Hydrogen utility System (IRHUS). IRHUS, Inc. plans to start limited production of the IRHUS in 2002. The IRHUS is a unique product with an innovative concept in that it provides continuous electrical power in places with no electrical infrastructure, i.e., in remote and island locations. The IRHUS is a zero emissions, self-sufficient, hydrogen fuel generation system that produces electricity on a continuous basis by combining any renewable power source with hydrogen technology. Current plans are to produce a 10 kilowatt IRHUS MP (medium power). Future plans are to design and manufacture IRHUS models to provide power for a variety of power ranges for identified attractive market segments. The technological components of the IRHUS include an electrolyzer, hydrogen and oxygen storage subsystems, fuel cell system, and power control system. The IRHUS product is to be integrated with a variety of renewable energy technologies. 5 figs., 10 tabs.

  17. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    International Nuclear Information System (INIS)

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  18. Collective proposal of Contingency Plan as an alternative for management risks to socioenvironmental disasters within Network Management Risk of Córrego Dantas (REGER-CD), Nova Friburgo, State of Rio de Janeiro, Brazil

    Science.gov (United States)

    Freitas, Leonardo; Luiza Coelho Netto, Ana

    2017-04-01

    An extreme rainfall event took place in the Mountainous Region of the state of Rio de Janeiro in January 2011, causing a catastrophic landslide that resulted in more than 900 deaths and 350 people disappearances. Precipitation events associated with landslides are common in this region and climate change tends to increase the frequency of intense rains and, consequently, landslides. At the same time, the vulnerability of communities has increased as a result of disorderly urban growth. Despite that, before 2011 communities and public power were not prepared to disaster management..After the 2011 event, public authorities try to established policies to reduce these vulnerabilities. One of the communities where the government acted was Córrego Dantas. However, the actions in this place were carried out in a top-down model, without discussion with population. As a consequence, the performance of public power has amplified social vulnerabilities. Highlight for the truculent removal of residents; resettlement in geographically isolated housing complexes; and the establishment of urbanization policies that go against the interests of the residents. The construction of the Córrego d'Aantas Disaster Risk Management Network (REGER-CD), including residents of affected communities, researchers, NGO members and representatives of the public power, is one way to respond these questions. Within this network, the construction of a proposal for a collective contingency plan, articulated with the municipal contingency plan, is generating residents' empowerment, greater adaptation to risks and reducing the vulnerability of Disasters and mass movements

  19. Solar data inputs for integration and transmission planning studies

    Energy Technology Data Exchange (ETDEWEB)

    Orwig, Kirsten D.; Hummon, Marissa; Hodge, Bri-Mathias; Lew, Debra [National Renewable Energy Laboratory, Golden, CO (United States)

    2011-07-01

    Renewable energy integration studies are frequently conducted to evaluate the impacts wind and solar power have on grid operations and planning. In the United States, these studies have historically been focused on wind energy integration. However, with the rapid deployment of large-scale and distributed solar power across the United States, and Hawaii, the interest in solar power variability and its impacts on the grid is increasing. To complete detailed integration studies, modeled power production of existing and future solar power deployments is necessary. This paper discusses some of the methods used to generate photovoltaic (PV) and concentrating solar power (CSP) production profiles for studies undertaken in the United States, evaluates the results, and compares the profiles with measured solar power production characteristics. (orig.)

  20. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  1. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  2. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  3. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  4. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    Energy Technology Data Exchange (ETDEWEB)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R&D) demonstrations, non-INEL R&D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document.

  5. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    International Nuclear Information System (INIS)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R ampersand D) demonstrations, non-INEL R ampersand D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document

  6. Thomas Aquinas on Contingency of Nature

    Czech Academy of Sciences Publication Activity Database

    Dvořák, Petr

    2008-01-01

    Roč. 5, č. 2 (2008), s. 185-196 ISSN 1214-8407 R&D Projects: GA AV ČR(CZ) IAA900090602 Institutional research plan: CEZ:AV0Z90090514 Keywords : Thomas Aquinas * determinism * contingency Subject RIV: AA - Philosophy ; Religion

  7. The Role of Feedback Contingency in Perceptual Category Learning

    Science.gov (United States)

    Ashby, F. Gregory; Vucovich, Lauren E.

    2016-01-01

    Feedback is highly contingent on behavior if it eventually becomes easy to predict, and weakly contingent on behavior if it remains difficult or impossible to predict even after learning is complete. Many studies have demonstrated that humans and nonhuman animals are highly sensitive to feedback contingency, but no known studies have examined how feedback contingency affects category learning, and current theories assign little or no importance to this variable. Two experiments examined the effects of contingency degradation on rule-based and information-integration category learning. In rule-based tasks, optimal accuracy is possible with a simple explicit rule, whereas optimal accuracy in information-integration tasks requires integrating information from two or more incommensurable perceptual dimensions. In both experiments, participants each learned rule-based or information-integration categories under either high or low levels of feedback contingency. The exact same stimuli were used in all four conditions and optimal accuracy was identical in every condition. Learning was good in both high-contingency conditions, but most participants showed little or no evidence of learning in either low-contingency condition. Possible causes of these effects are discussed, as well as their theoretical implications. PMID:27149393

  8. Integration of the radiotherapy irradiation planning in the digital workflow

    International Nuclear Information System (INIS)

    Roehner, F.; Schmucker, M.; Henne, K.; Bruggmoser, G.; Grosu, A.L.; Frommhold, H.; Heinemann, F.E.; Momm, F.

    2013-01-01

    Background and purpose: At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. Method: After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. Results and conclusion: The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority. (orig.)

  9. Integrating financial theory and methods in electricity resource planning

    Energy Technology Data Exchange (ETDEWEB)

    Felder, F.A. [Economics Resource Group, Cambridge, MA (United States)

    1996-02-01

    Decision makers throughout the world are introducing risk and market forces in the electric power industry to lower costs and improve services. Incentive based regulation (IBR), which replaces cost of service ratemaking with an approach that divorces costs from revenues, exposes the utility to the risk of profits or losses depending on their performance. Regulators also are allowing for competition within the industry, most notably in the wholesale market and possibly in the retail market. Two financial approaches that incorporate risk in resource planning are evaluated: risk adjusted discount rates (RADR) and options theory (OT). These two complementary approaches are an improvement over the standard present value revenue requirement (PVRR). However, each method has some important limitations. By correctly using RADR and OT and understanding their limitations, decision makers can improve their ability to value risk properly in power plant projects and integrated resource plans. (Author)

  10. Buried waste integrated demonstration FY 94 deployment plan

    International Nuclear Information System (INIS)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document

  11. BC Hydro best practices : energy efficiency and integrated planning

    International Nuclear Information System (INIS)

    Henriques, D.

    2004-01-01

    The key elements to success in energy efficiency include integrated energy planning, a review of conservation potential, pursuing a target, risk sharing between all parties, and long term planning when making investments in demand side management (DSM). The barriers to cost effective energy efficiency investment were also outlined along with the scope of the conservation potential review which included 95 per cent of electricity end use applications in all market sectors including residential, commercial, institutional and industrial. BC Hydro's Power Smart program focuses on energy efficiency and load displacement to meet 35 per cent of the utility's forecasted growth by 2012. The sources of savings within each of the market sectors were identified. Key recommendations regarding energy efficiency and conservation were also presented with reference to financial incentives offered by BC Hydro to consumers to encourage a switch to more efficient lighting systems. 10 figs

  12. Integration of Renewable Generation in Power System Defence Plans

    DEFF Research Database (Denmark)

    Das, Kaushik

    Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity of conven......Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity......, one of them being the North East area with high share of wind power generation.The aim of this study is to investigate how renewable generations like wind power can contribute to the power system defence plans. This PhD project “Integration of Renewable Generation in Power System Defence Plans...

  13. Integrated resource planning - a long and winding road

    International Nuclear Information System (INIS)

    Reuter, A.L.

    1995-01-01

    The separation of Croatia from former Yugoslavia and the military turbulence at its borders during the last years caused a number of problems in the Croatian energy system. Resources for improving the situation are scarce. So it is necessary to plan the rehabilitation and modernization of the Croatian energy system in a way which includes all national resources and allocates these resources where they lead to the highest benefits to the national economy. In this paper it is shown that Integrated Resource Planning (IRP) is such a method which enables the rational use of national resources. Also presented in this paper is a transparent and rational procedure which allows the energy planner to support the decision maker in developing an energy policy under consideration of interests of affected groups. This procedure is called Structured Analysis Procedure and step by step leads from the problem formulation to the decision on which action is to be applied to solve the problem. (author)

  14. Integrating Resources into Curriculum with the Systems Connect Planning Guide

    Science.gov (United States)

    Oshry, A.; Bean, J. R.

    2017-12-01

    A broadly applicable and guided approach for planning curriculum and instruction around new academic standards or initiatives is critical for implementation success. Curriculum and assessment differs across schools and districts, so built-in adaptability is important for maximal adoption and ease of use by educators. The Systems Connect Planning Guide directs the flow of instruction for building conceptual links between topics in a unit/curriculum through critical vetting and integration of relevant resources. This curricular template is flexible for use in any setting or subject area, and ensures applicability, high impact and responsiveness to academic standards while providing inquiry-based, real-world investigations and action that incorporate authentic research and data. These needs are what informed the creation of the three components of the planning guide:• Curriculum Anchor: alignment with academic standards & learning outcomes and setting the context of the topic• Issues Investigations: informing how students explore topics, and incorporate authentic research and data into learning progressions• Civic Action: development of how students could apply their knowledgeThe Planning Guide also incorporates criteria from transdisciplinary practices, cross-cutting concepts, and organizational charts for outlining guiding questions and conceptual links embedded in the guide. Integration of experiential learning and real-world connections into curricula is important for proficiency and deeper understanding of content, replacing discrete, stand-alone experiences which are not explicitly connected. Rather than information being dispelled through individual activities, relying on students to make the connections, intentionally documenting explicit connections provides opportunities to foster deeper understanding by building conceptual links between topics, which is how fundamental knowledge about earth and living systems is gained. Through the critical vetting

  15. Integration of Regional Mitigation Assessment and Conservation Planning

    Directory of Open Access Journals (Sweden)

    James H. Thorne

    2009-06-01

    Full Text Available Government agencies that develop infrastructure such as roads, waterworks, and energy delivery often impact natural ecosystems, but they also have unique opportunities to contribute to the conservation of regional natural resources through compensatory mitigation. Infrastructure development requires a planning, funding, and implementation cycle that can frequently take a decade or longer, but biological mitigation is often planned and implemented late in this process, in a project-by-project piecemeal manner. By adopting early regional mitigation needs assessment and planning for habitat-level impacts from multiple infrastructure projects, agencies could secure time needed to proactively integrate these obligations into regional conservation objectives. Such practice can be financially and ecologically beneficial due to economies of scale, and because earlier mitigation implementation means potentially developable critical parcels may still be available for conservation. Here, we compare the integration of regional conservation designs, termed greenprints, with early multi-project mitigation assessment for two areas in California, USA. The expected spatial extent of habitat impacts and associated mitigation requirements from multiple projects were identified for each area. We used the reserve-selection algorithm MARXAN to identify a regional greenprint for each site and to seek mitigation solutions through parcel acquisition that would contribute to the greenprint, as well as meet agency obligations. The two areas differed in the amount of input data available, the types of conservation objectives identified, and local land-management capacity. They are representative of the range of conditions that conservation practitioners may encounter, so contrasting the two illustrates how regional advanced mitigation can be generalized for use in a wide variety of settings. Environmental organizations can benefit from this approach because it provides a

  16. Study findings on evaluation of integrated family planning programme performance.

    Science.gov (United States)

    1980-01-01

    In 1976 the United Nations's Economic and Social Commission for Asia and the Pacific launched a comparative study on integrated family planning programs in a number of countries in the region. In November 1979 the study directors from the participating countries meet in Bangkok to discuss the current status of the studies in their countries. The Korean and Malaysian studies were completed, the Bangladesh study was in the data collecting phase, and the Pakistani research design phase was completed. The meeting participants focused their attention on the findings and policy implications of the 2 completed studies and also discussed a number of theorectical and methodological issues which grew out of their research experience. The Malaysian study indicated that group structure, financial resources, and the frequency and quality of worker-client contact were the most significant variables determining program effectiveness. In the Korean Study, leadership, financial resources, and the frequency and quality of contact between agencies were the key variables in determining program effectiveness. In the Malaysian study there was a positive correlation between maternal and child health service performance measures and family planning service performance measures. This finding supported the contention that these 2 types of service provision are not in conflict with each other but instead serve to reinforce each other. Policy implications of the Korean study were 1) family planning should be an integral part of all community activities; 2) family planning workers should be adequately supported by financial and supply allocations; and 3) adequate record keeping and information exchange procedures should be incorporated in the programs.

  17. Integrating student-focused career planning into undergraduate gerontology programs.

    Science.gov (United States)

    Manoogian, Margaret M; Cannon, Melissa L

    2018-04-02

    As our global older adult populations are increasing, university programs are well-positioned to produce an effective, gerontology-trained workforce (Morgan, 2012; Silverstein & Fitzgerald, 2017). A gerontology curriculum comprehensively can offer students an aligned career development track that encourages them to: (a) learn more about themselves as a foundation for negotiating career paths; (b) develop and refine career skills; (c) participate in experiential learning experiences; and (d) complete competency-focused opportunities. In this article, we discuss a programmatic effort to help undergraduate gerontology students integrate development-based career planning and decision-making into their academic programs and achieve postgraduation goals.

  18. Integration of risk analysis, land use planning, and cost analysis

    International Nuclear Information System (INIS)

    Rajen, G.; Sanchez, G.

    1994-01-01

    The Department of Energy (DOE) and the Pueblo of San Ildefonso (Pueblo), which is a sovereign Indian tribe, have often been involved in adversarial situations regarding the Los Alamos National Laboratory (LANL). The Pueblo shares a common boundary with the LANL. This paper describes an on-going project that could alter the DOE and the Pueblo's relationship to one of cooperation; and unite the DOE and the Pueblo in a Pollution Prevention/Waste Minimization, and Integrated Risk Analysis and Land Use Planning effort

  19. Integrated Rolling Stock Planning for Suburban Passenger Trains

    DEFF Research Database (Denmark)

    Thorlacius, Per

    used, the result being the loss of optimality. The talk will present a new, integrated rolling stock planning model in which the many requirements are handled all at the same time. Preliminary results from DSB S-tog, the suburban train operator of the City of Copenhagen will also be presented.......A central issue for operators of passenger trains is providing sufficient number of seats while minimising operating costs. This process must be conducted taking a large number of practical, railway oriented requirements into account. Because of this complexity, a stepwise solution was previously...

  20. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene

    2018-03-01

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR

  1. Integration of fisheries into marine spatial planning: Quo vadis?

    Science.gov (United States)

    Janßen, Holger; Bastardie, Francois; Eero, Margit; Hamon, Katell G.; Hinrichsen, Hans-Harald; Marchal, Paul; Nielsen, J. Rasmus; Le Pape, Olivier; Schulze, Torsten; Simons, Sarah; Teal, Lorna R.; Tidd, Alex

    2018-02-01

    The relationship between fisheries and marine spatial planning (MSP) is still widely unsettled. While several scientific studies highlight the strong relation between fisheries and MSP, as well as ways in which fisheries could be included in MSP, the actual integration of fisheries into MSP often fails. In this article, we review the state of the art and latest progress in research on various challenges in the integration of fisheries into MSP. The reviewed studies address a wide range of integration challenges, starting with techniques to analyse where fishermen actually fish, assessing the drivers for fishermen's behaviour, seasonal dynamics and long-term spatial changes of commercial fish species under various anthropogenic pressures along their successive life stages, the effects of spatial competition on fisheries and projections on those spaces that might become important fishing areas in the future, and finally, examining how fisheries could benefit from MSP. This paper gives an overview of the latest developments on concepts, tools, and methods. It becomes apparent that the spatial and temporal dynamics of fish and fisheries, as well as the definition of spatial preferences, remain major challenges, but that an integration of fisheries is already possible today.

  2. Characterizing spatial uncertainty when integrating social data in conservation planning.

    Science.gov (United States)

    Lechner, A M; Raymond, C M; Adams, V M; Polyakov, M; Gordon, A; Rhodes, J R; Mills, M; Stein, A; Ives, C D; Lefroy, E C

    2014-12-01

    Recent conservation planning studies have presented approaches for integrating spatially referenced social (SRS) data with a view to improving the feasibility of conservation action. We reviewed the growing conservation literature on SRS data, focusing on elicited or stated preferences derived through social survey methods such as choice experiments and public participation geographic information systems. Elicited SRS data includes the spatial distribution of willingness to sell, willingness to pay, willingness to act, and assessments of social and cultural values. We developed a typology for assessing elicited SRS data uncertainty which describes how social survey uncertainty propagates when projected spatially and the importance of accounting for spatial uncertainty such as scale effects and data quality. These uncertainties will propagate when elicited SRS data is integrated with biophysical data for conservation planning and may have important consequences for assessing the feasibility of conservation actions. To explore this issue further, we conducted a systematic review of the elicited SRS data literature. We found that social survey uncertainty was commonly tested for, but that these uncertainties were ignored when projected spatially. Based on these results we developed a framework which will help researchers and practitioners estimate social survey uncertainty and use these quantitative estimates to systematically address uncertainty within an analysis. This is important when using SRS data in conservation applications because decisions need to be made irrespective of data quality and well characterized uncertainty can be incorporated into decision theoretic approaches. © 2014 Society for Conservation Biology.

  3. Integrated energy, air quality and greenhouse gas management plan

    International Nuclear Information System (INIS)

    2004-03-01

    This report outlines the measures that the Resort Municipality of Whistler has taken to become a sustainable community. In 2000, the Municipality adopted the Natural Step, a tool developed by international scientists to integrate ecological principles into the practices of communities, organizations and individuals. In 2001, the Municipality adopted a comprehensive sustainability plan. This report describes the efforts to manage energy, air quality, and greenhouse gases (GHG). More than 90 per cent of the common air contaminants that contribute to air quality problems in Whistler come from the combustion of fossil fuels. The community can reduce emissions of carbon monoxide, oxides of nitrogen, oxides of sulphur, volatile organic compounds, and particulate matter by managing energy and GHG emissions. This report is divided into several sections dealing with corporate and community energy use. It presents a community profile for Whistler, its energy and emissions inventory from 2000, and an integrated energy plan. An energy and emissions forecast for 2000 to 2020 was also included along with an implementation strategy for a sustainable energy future for Whistler. refs., tabs., figs

  4. Integrated approach to planning the remediation of sites undergoing decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Responding to the needs of Member States, the IAEA has launched an environmental remediation guidance initiative dealing with the issues of radioactive contamination world wide. Its aim is to collate and disseminate information concerning the key issues affecting environmental remediation of contaminated sites. This IAEA initiative includes the development of documents that report on remediation technologies available, best practices, and information and guidance concerning (a) Strategy development for environmental remediation; (b) Characterization and remediation of contaminated sites and contaminated groundwater; (c) Management of waste and residues from mining and milling of uranium and thorium; (d) Decommissioning of buildings; (e) A database for contaminated sites. The subject of this present report concerns the integration of decommissioning and remediation activities at sites undergoing decommissioning and this fits within the first category of guidance documentation (strategy development). This document addresses key strategic planning issues. It is intended to provide practical advice and complement other reports that focus on decommissioning and remediation at nuclear facilities. The document is designed to encourage site remediation activities that take advantage of synergies with decommissioning in order to reduce the duplication of effort by various parties and minimize adverse impacts on human health, the environment, and costs through the transfer of experience and knowledge. To achieve this objective, the document is designed to help Member States gain perspective by summarizing available information about synergies between decommissioning and remediation, strategic planning and project management and planning tools and techniques to support decision making and remediation. Case studies are also presented as to give concrete examples of the theoretical elements elaborated in the documents. This publication investigates the potential synergies

  5. An integrated approach for facilities planning by ELECTRE method

    Science.gov (United States)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with

  6. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    International Nuclear Information System (INIS)

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  7. Process for integrating surface drainage constraints on mine planning

    Energy Technology Data Exchange (ETDEWEB)

    Sawatsky, L.F; Ade, F.L.; McDonald, D.M.; Pullman, B.J. [Golder Associates Ltd., Calgary, AB (Canada)

    2009-07-01

    Surface drainage for mine closures must be considered during all phases of mine planning and design in order to minimize environmental impacts and reduce costs. This paper discussed methods of integrating mine drainage criteria and associated mine planning constraints into the mine planning process. Drainage constraints included stream diversions; fish compensation channels; collection receptacles for the re-use of process water; separation of closed circuit water from fresh water; and the provision of storage ponds. The geomorphic approach replicated the ability of natural channels to respond to local and regional changes in hydrology as well as channel disturbances from extreme flood events, sedimentation, debris, ice jams, and beaver activity. The approach was designed to enable a sustainable system and provide conveyance capacity for extreme floods without spillage to adjacent watersheds. Channel dimensions, bank and bed materials, sediment loads, bed material supplies and the hydrologic conditions of the analogue stream were considered. Hydrologic analyses were conducted to determine design flood flow. Channel routes, valley slopes, sinuosity, width, and depth were established. It was concluded that by incorporating the geomorphic technique, mine operators and designers can construct self-sustaining drainage systems that require little or no maintenance in the long-term. 7 refs.

  8. Integrated system dynamics toolbox for water resources planning.

    Energy Technology Data Exchange (ETDEWEB)

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David (University of New Mexico, Albuquerque, NM); Chemak, Janie (University of New Mexico, Albuquerque, NM); Cockerill, Kristan (Cockeril Consulting, Boone, NC); Aragon, Carlos (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward

  9. 76 FR 42735 - Comment Request for Information Collection for State Integrated Workforce Plan Requirements for...

    Science.gov (United States)

    2011-07-19

    .../Wagner- Peyser ``stand-alone'' planning guidance, formerly entitled ``Planning Guidance and Instructions... Seasonal Farmworker (MSFW) Annual Outreach Plan (AOP), Trade Adjustment Assistance (TAA), and Senior... integrate DOL-funded programs into a single plan, it does not replace Unified Plan guidance that exists...

  10. Contingencies of Value

    DEFF Research Database (Denmark)

    Strandvad, Sara Malou

    2014-01-01

    Based on a study of the admission test at a design school, this paper investigates the contingencies of aesthetic values as these become visible in assessment practices. Theoretically, the paper takes its starting point in Herrnstein Smith’s notion of ‘contingencies of values’ and outlines...... a pragmatist ground where cultural sociology and economic sociology meet. Informed by the literature on cultural intermediaries, the paper discusses the role of evaluators and the devices which accompany them. Whereas studies of cultural intermediaries traditionally apply a Bourdieusian perspective, recent......, the paper does not accept this storyline. As an alternative, the paper outlines the contingencies of values which are at play at the admission test, composed of official assessment criteria and scoring devices together with conventions within the world of design, and set in motion by interactions...

  11. Strategic planning of an integrated program for state oversight agreements

    International Nuclear Information System (INIS)

    Walzer, A.E.; Cothron, T.K.

    1991-01-01

    Among the barrage of agreements faced by federal facilities are the State Oversight Agreements (known as Agreements in Principle in many states). These agreements between the Department of Energy (DOE) and the states fund the states to conduct independent environmental monitoring and oversight which requires plans, studies, inventories, models, and reports from DOE and its management and operating contractors. Many states have signed such agreements, including Tennessee, Kentucky, Washington, Idaho, Colorado, California, and Florida. This type of oversight agreement originated in Colorado as a result of environmental concerns at the Rocky Flats Plant. The 5-year State Oversight Agreements for Tennessee and Kentucky became effective on May 13, 1991, and fund these states nearly $21 million and $7 million, respectively. Implementation of these open-quotes comprehensive and integratedclose quotes agreements is particularly complex in Tennessee where the DOE Oak Ridge Reservation houses three installations with distinctly different missions. The program development and strategic planning required for coordinating and integrating a program of this magnitude is discussed. Included are the organizational structure and interfaces required to define and coordinate program elements across plants and to also effectively negotiate scope and schedules with the state. The planned Program Management Plan, which will contain implementation and procedural guidelines, and the management control system for detailed tracking of activities and costs are outlined. Additionally, issues inherent in the nature of the agreements and implementation of a program of this magnitude are discussed. Finally, a comparison of the agreements for Tennessee, Kentucky, Colorado, and Idaho is made to gain a better understanding of the similarities and differences in State Oversight Agreements to aid in implementation of these agreements

  12. A Modelling Approach for Integrated Planning of Port Capacity- Trade-Offs in Rotterdam Investment Planning

    Directory of Open Access Journals (Sweden)

    Sander Dekker

    2006-03-01

    Full Text Available This paper presents a modelling approach for planning ofport capacity. The approach integrates port commercial andpublic interests. It further incorporates route competition andautonomous demand growth. It is applied to port expansion,which can be considered as a strategy for an individual port todeal with route competition. The basis for solving this planningproblem comprises an analysis of port demand and supply in apartial equilibrium model. With such an approach, the reactionof a single port on the change in a transport network comprisingalternative routes to a hinterland destination can be simulated.To establish the optimal expansion strategy, port expansion iscombined with congestion pricing. This is used for the simultaneousdetermination of 1 optimal expansion size, and 2 investmentrecovery period. The modelling approach will be appliedto Rotterdam port focusing on port expansion by means ofland reclamation. The scenmio of the entry of a new competingroute via the Italian port Gioia Tauro is used to address sometrade-offs in Rotterdam investment planning.

  13. Practical application of Integrated National Energy Planning (INEP) using microcomputers

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    The paper describes the use of a practical microcomputer-based, hierarchical modelling framework for Integrated National Energy Planning (INEP), and policy analysis. The rationale for the concept and the development of the methodology are traced, following the energy crises of the 1970s. Details of the INEP process, which includes analysis at three hierarchical levels (the energy-microeconomic, energy sector and energy subsector) are given. A description of the various models, the scenarios and assumptions used in the analysis, as well as the linkages and interactions, is provided. The Sri Lanka energy situation is summarized, and the principal energy issues and options derived from the modelling are used to synthesize a national energy strategy. (author). 11 refs, 8 figs, 11 tabs

  14. Savannah River Site integrated stabilization management plan. Revision 3

    International Nuclear Information System (INIS)

    Geddes, R.L.; Barone, A.; Shook, H.E.; Varner, C.E.; Rollins, R.

    1996-01-01

    On May 26, 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 94-1. The concern is that the halt in production of materials to be used in nuclear weapons froze the manufacturing pipeline in a state that, for safety reasons, should not be allowed to persist unremediated. This recommendation had eight specific sub-recommendations that dealt with the potential problems. Specifically, the Board expressed concern about certain liquids and solids containing fissile materials and other radioactive substances located in spent fuel storage pools, reactor basins, reprocessing canyons; and various other facilities once used for processing and weapons manufacture. The WSRC and DOE-SR acknowledges and shares the Board's concerns and has developed this Integrated Stabilization Management Plan (ISMP) to aggressively address these urgent problems in a systems engineering approach

  15. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  16. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  17. PERSPECTIVES ON INTEROPERABILITY INTEGRATION WITHIN NATO DEFENSE PLANNING PROCESS

    Directory of Open Access Journals (Sweden)

    Florian CIOCAN

    2011-01-01

    Full Text Available Interoperability is not a new area of effort at NATO level. In fact, interoperability and more specifi cally standardization, has been a key element of the Alliance’s approach to fi elding forces for decades. But as the security and operational environment has been in a continuous change, the need to face the new threats and the current involvement in challenging operations in Afghanistan and elsewhere alongside with the necessity to interoperate at lower and lower levels of command with an increasing number of nations, including non-NATO ISAF partners, NGOs, and other organizations, have made the task even more challenging. In this respect Interoperability Integration within NATO Defense Planning Process will facilitate the timely identifi cation, development and delivery of required forces and capabilities that are interoperable and adequately prepared, equipped, trained and supported to undertake the Alliance’s full spectrum of missions.

  18. Strategic Planning in Education: A Guide for Policymakers.

    Science.gov (United States)

    Cooper, Harry A.

    As defined in chapter I of this guide for policymakers, strategic planning is the method by which an organization identifies relevant trends in its environment, analyzes their potential implications, and projects an integrated strategy to address these future events and their contingencies. This process differs from formalized planning, based on…

  19. Contingent valuation and incentives

    Science.gov (United States)

    Patricia A. Champ; Nicholas E. Flores; Thomas C. Brown; James Chivers

    2002-01-01

    We empirically investigate the effect of the payment mechanism on contingent values by asking a willingness-to-pay question with one of three different payment mechanisms: individual contribution, contribution with provision point, and referendum. We find statistical evidence of more affirmative responses in the referendum treatment relative to the individual...

  20. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  1. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  2. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    Science.gov (United States)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  3. Tank waste remediation system integrated technology plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P. [eds.] [Pacific Northwest Lab., Richland, WA (United States)

    1995-02-28

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m{sup 3} (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program.

  4. Tank waste remediation system integrated technology plan. Revision 2

    International Nuclear Information System (INIS)

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P.

    1995-01-01

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m 3 (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program

  5. Integration of implant planning workflows into the PACS infrastructure

    Science.gov (United States)

    Gessat, Michael; Strauß, Gero; Burgert, Oliver

    2008-03-01

    The integration of imaging devices, diagnostic workstations, and image servers into Picture Archiving and Communication Systems (PACS) has had an enormous effect on the efficiency of radiology workflows. The standardization of the information exchange between the devices with the DICOM standard has been an essential precondition for that development. For surgical procedures, no such infrastructure exists. With the increasingly important role computerized planning and assistance systems play in the surgical domain, an infrastructure that unifies the communication between devices becomes necessary. In recent publications, the need for a modularized system design has been established. A reference architecture for a Therapy Imaging and Model Management System (TIMMS) has been proposed. It was accepted by the DICOM Working Group 6 as the reference architecture for DICOM developments for surgery. In this paper we propose the inclusion of implant planning systems into the PACS infrastructure. We propose a generic information model for the patient specific selection and positioning of implants from a repository according to patient image data. The information models are based on clinical workflows from ENT, cardiac, and orthopedic surgery as well as technical requirements derived from different use cases and systems. We show an exemplary implementation of the model for application in ENT surgery: the selection and positioning of an ossicular implant in the middle ear. An implant repository is stored in the PACS. It makes use of an experimental implementation of the Surface Mesh Module that is currently being developed as extension to the DICOM standard.

  6. Supervisory Styles: A Contingency Framework

    Science.gov (United States)

    Boehe, Dirk Michael

    2016-01-01

    While the contingent nature of doctoral supervision has been acknowledged, the literature on supervisory styles has yet to deliver a theory-based contingency framework. A contingency framework can assist supervisors and research students in identifying appropriate supervisory styles under varying circumstances. The conceptual study reported here…

  7. Contingency diagrams as teaching tools

    OpenAIRE

    Mattaini, Mark A.

    1995-01-01

    Contingency diagrams are particularly effective teaching tools, because they provide a means for students to view the complexities of contingency networks present in natural and laboratory settings while displaying the elementary processes that constitute those networks. This paper sketches recent developments in this visualization technology and illustrates approaches for using contingency diagrams in teaching.

  8. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Hartman, Mary J.; Dresel, P. Evan; Lindberg, Jon W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  9. The Philippines: integrated planning for balanced urban growth.

    Science.gov (United States)

    1981-12-01

    During the past 80 years, the proportion of the Philippine population living in urban areas has nearly tripled, from 13% at the beginning of the 20th century to 36% in 1980. The number of people living in urban areas multipled 17-fold over this period. Currently, an estimated 17 million people live in urban areas, and this number is expected to reach 30 million by the year 2000. Migration from rural areas has been an important component of urban growth, but it has not been the principal one. Natural increase accounted for 54% of total urban growth in the 1960s and 1970s. A combination of reclassification and migration accounted for the rest. Big cities did not grow as rapidly as small cities, since their growth was generated largely by urban inmigration. Small cities tended to grow faster due to more natural increase than to inmigration. Philippine urbanization has been marked by increasing primacy. Metropolitan Manila, the largest city, has more than quadrupled in size since 1950. The phenomenon of primacy has been the cumulative consequence of historical, demographic, political, and socioeconomic factors. It may also have resulted from growth policies which unintentionally and indirectly favored the premier city. For national planners, the issue of urbanization in the Philippines is closely intertwined with the country's development objectives, particularly those of reducing poverty and attaining a more equitable distribution of income and wealth. The integration of population growth and distribution trends into the planning process is very important. Efforts to actively advocate this approach at various planning levels have been initiated. More must be learned about population and development dynamics, and planning capabilities at all levels must be improved.

  10. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  11. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  12. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  13. 1998 242-A interim evaporator tank system integrity assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-03-31

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology`s Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem.

  14. Decision support for integrated water-energy planning.

    Energy Technology Data Exchange (ETDEWEB)

    Tidwell, Vincent Carroll; Malczynski, Leonard A.; Kobos, Peter Holmes; Castillo, Cesar; Hart, William Eugene; Klise, Geoffrey T.

    2009-10-01

    Currently, electrical power generation uses about 140 billion gallons of water per day accounting for over 39% of all freshwater withdrawals thus competing with irrigated agriculture as the leading user of water. Coupled to this water use is the required pumping, conveyance, treatment, storage and distribution of the water which requires on average 3% of all electric power generated. While water and energy use are tightly coupled, planning and management of these fundamental resources are rarely treated in an integrated fashion. Toward this need, a decision support framework has been developed that targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. The framework integrates analysis and optimization capabilities to identify trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., national, state, county, watershed, NERC region). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. Ultimately, this open and interactive modeling framework provides a tool for evaluating competing policy and technical options relevant to the energy-water nexus.

  15. 1998 242-A interim evaporator tank system integrity assessment plan

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology's Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem

  16. Public Participation Procedure in Integrated Transport and Green Infrastructure Planning

    Science.gov (United States)

    Finka, Maroš; Ondrejička, Vladimír; Jamečný, Ľubomír; Husár, Milan

    2017-10-01

    The dialogue among the decision makers and stakeholders is a crucial part of any decision-making processes, particularly in case of integrated transportation planning and planning of green infrastructure where a multitude of actors is present. Although the theory of public participation is well-developed after several decades of research, there is still a lack of practical guidelines due to the specificity of public participation challenges. The paper presents a model of public participation for integrated transport and green infrastructure planning for international project TRANSGREEN covering the area of five European countries - Slovakia, Czech Republic, Austria, Hungary and Romania. The challenge of the project is to coordinate the efforts of public actors and NGOs in international environment in oftentimes precarious projects of transport infrastructure building and developing of green infrastructure. The project aims at developing and environmentally-friendly and safe international transport network. The proposed public participation procedure consists of five main steps - spread of information (passive), collection of information (consultation), intermediate discussion, engagement and partnership (empowerment). The initial spread of information is a process of communicating with the stakeholders, informing and educating them and it is based on their willingness to be informed. The methods used in this stage are public displays, newsletters or press releases. The second step of consultation is based on transacting the opinions of stakeholders to the decision makers. Pools, surveys, public hearings or written responses are examples of the multitude of ways to achieve this objective and the main principle of openness of stakeholders. The third step is intermediate discussion where all sides of are invited to a dialogue using the tools such as public meetings, workshops or urban walks. The fourth step is an engagement based on humble negotiation, arbitration and

  17. INTEGRATED SYSTEMS FOR PLANNING AND RESOURCES MANAGEMENT IN COMPANIES

    Directory of Open Access Journals (Sweden)

    Balaban Mihai

    2014-07-01

    Full Text Available Information is one of the most valuable resources of a company, since with it and around it the whole set of business processes unfold within companies. Till using internet companies were eager to find information that was necessary for the functioning and development of the company; now things have changed radically: the information is abundant and is provided through all possible channels; today, in order to thrive you have to „choose" and to filter the information to remain competitive on the market you are active on. The performance of an enterprise is influenced by its ability to adapt itself to the environment, by the effectiveness of its actions in capitalizing opportunities, by its ability to cope with adverse situations and risks. Information management is a process that analyzes the previously collected information and then the information is used by managers to make decisions or as a base for their decisions. Information in management is the information that is necessary for making managerial decisions. Distribution or Information Flow: in order for it to be used appropriately, information should be exchanged between the various participants in the project. Other parts involved in the project may also use this information in making their own decisions. This way they can help those who collect information to determine its usefulness for the management. For management, information is an integral part of monitoring because it is obtained during monitoring and helps in planning and implementing its activities. The problem and the reason of this study is to increase awareness of the need for implementation of ERP solutions, primarily, and secondly to share observations with regard to this issue as well as the evolution of acceptance and integration in Romania of such integrated solutions. The effectiveness of information management and knowledge management is urgently needed to assure a continuous organizational survival and the

  18. Integrated Task and Motion Planning with Verification via Formal Methods

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal lays out a research plan to "lift" current state-of-the-art results combining discrete and continuous layers of planning in motion planning to the more...

  19. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  20. Comparative study of plans for integrated residue management of construction: an analysis documental

    OpenAIRE

    Júnior, Jorge Henrique e Silva; Vieira, Elizângela de Jesus Oliveira de Sousa; Monte, Maria José Soares; Carvalho, Moisés Lopes; Oliveira, Francílio de Carvalho; Carvalho, Jancineide Oliveira de

    2013-01-01

    Objective: The present study is a comparative study of integrated plans in four cities, highlighting the points that are in accordance with Resolution 307/2002 of CONAMA. Methods: This is a bibliographic and documentary research as having scientific articles sources Plans and Integrated Solid Waste Management Construction of five Brazilian cities: Curitiba, Cuiaba, Florianopolis, Rio de Janeiro and São Paulo. Results: The resolution foresees the Integrated Management of Residues Plan for Cons...

  1. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  2. Supply chain planning with sustainability considerations: an integrative framework

    DEFF Research Database (Denmark)

    Wang, Yang; Akkerman, Renzo; Birkved, Morten

    2011-01-01

    This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from sustai...... produced on industrial scale, studying several important planning decisions like temperature treatments and choice of packaging materials.......This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from...

  3. From Landscape Research to Landscape Planning : Aspects of Integration, Education and Application

    NARCIS (Netherlands)

    Tress, B.; Tress, G.; Fry, G.; Opdam, P.F.M.

    2006-01-01

    Research policy favours projects that integrate disciplinary knowledge and involve non-academic stakeholders. Consequently, integrative concepts - interdisciplinarity and transdisciplinarity - are gaining currency in landscape research and planning. Researchers are excited by the prospect of merging

  4. Social Sensorimotor Contingencies

    OpenAIRE

    Bütepage, Judith

    2016-01-01

    As the field of robotics advances, more robots are employed in our everyday environment. Thus, the implementation of robots that can actively engage in physical collaboration and naturally interact with humans is of high importance. In order to achieve this goal, it is necessary to study human interaction and social cognition and how these aspects can be implemented in robotic agents. The theory of social sensorimotor contingencies hypothesises that many aspects of human-human interaction de...

  5. DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1996-01-01

    This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE's plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan

  6. Integrating robust timetabling in line plan optimization for railway systems

    DEFF Research Database (Denmark)

    Burggraeve, Sofie; Bull, Simon Henry; Vansteenwegen, Pieter

    2017-01-01

    We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger travel time and operator cost and for which a feasible and robust timetable exists. A line planning module and a timetabling module work iteratively and interactively. The line planning module......, but is constrained by limited shunt capacity. While the operator and passenger cost remain close to those of the initially and (for these costs) optimally built line plan, the timetable corresponding to the finally developed robust line plan significantly improves the minimum buffer time, and thus the robustness...... creates an initial line plan. The timetabling module evaluates the line plan and identifies a critical line based on minimum buffer times between train pairs. The line planning module proposes a new line plan in which the time length of the critical line is modified in order to provide more flexibility...

  7. Buried Waste Integrated Demonstration FY-93 Deployment Plan

    International Nuclear Information System (INIS)

    Bonnenberg, R.W.; Heard, R.E.; Milam, L.M.; Watson, L.R.

    1993-02-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year 1993 effort will deploy seven major field demonstrations at the Idaho National Engineering Laboratory's (INEL's) Radioactive Waste Management Complex Cold Test Pit. These major demonstrations are Remote Characterization System, Remote Excavation System, Overburden Removal, Waste Isolation, Contamination Control Unit, Rapid Monitoring Unit, and Fixation of Soil Surface Contamination. This document is the basic operational planning document for BWID deployment of the INEL field demonstrations. Additional sections deal briefly with four nonINEL field and laboratory demonstrations (Buried Waste Retrieval, Arc Melter Vitrification, Graphite DC Plasma Arc Melter, and Fixed Hearth Plasma Process) and with four INEL laboratory demonstrations (Electrostatic Curtain, Thermal Kinetics, Multiaxis Crane Control System, and Dig-Face Characterization)

  8. Integrated planning aimed at sustainability city logistics solutions

    Directory of Open Access Journals (Sweden)

    Tadić Snežana R.

    2015-01-01

    Full Text Available The main objective of city logistics system is sustainability, or efficiency, wide acceptability, environmental protection and safety. On the other hand, the city logistics system is very complex. It is characterized by a large number of participants, with different, usually conflicting goals and complex interactions. In addition, the system of city logistics is part of a wider system of the town, the region, and there are complex interactions with the external environment. The system depends on the specific characteristics of the city, affects other forms of urban mobility and is subject to the policies of higher rank (regional, national policy. Given the exceptional complexity, sustainable city logistics solution requires an integrated approach in all phases of planning, from stages of problem identification, definition of alternative solutions and effects assessment, to implementation and by exploitation. In this way, the solution of city logistics is becoming widely accepted and not only affects the efficiency of the socio-economic system of town, already on the sustainability of the whole region.

  9. Are Integrated Plan Providers Associated With Lower Premiums on the Health Insurance Marketplaces?

    Science.gov (United States)

    La Forgia, Ambar; Maeda, Jared Lane K; Banthin, Jessica S

    2018-04-01

    As the health insurance industry becomes more consolidated, hospitals and health systems have started to enter the insurance business. Insurers are also rapidly acquiring providers. Although these "vertically" integrated plan providers are small players in the insurance market, they are becoming more numerous. The health insurance marketplaces (HIMs) offer a unique setting to study integrated plan providers relative to other insurer types because the HIMs were designed to promote competition. In this descriptive study, the authors compared the premiums of the lowest priced silver plans of integrated plan providers with other insurer types on the 2015 and 2016 HIMs. Integrated plan providers were associated with modestly lower premiums relative to most other insurer types. This study provides early insights into premium competition on the HIMs. Examining integrated plan providers as a separate insurer type has important policy implications because they are a growing segment of the marketplaces and their pricing behavior may influence future premium trends.

  10. Management of comments on DOE's Site Characterization Plan (SCP) and integration with the planned geotechnical program

    International Nuclear Information System (INIS)

    Bjerstedt, T.W.; Gil, A.V.; Baird, F.A.

    1991-01-01

    The US DOE has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on both the SCP/Consultation Draft and the statutory SCP. Of these, 2,662 responses have been completed and returned to the originators. Many comments are programmatic in nature and express diverse concerns beyond the scope of the SCP. DOE uses a three-tiered process in responding to comments that integrated technical and management responsibilities. The process defines specific roles in developing, reviewing, and concurring on responses. Commitments or open-items can be generated in DOE responses to comments, which are tracked on a relational database. Major changes reflected in the Secretary of Energy's 1989 reassessment of the high-level waste program were advocated in comments on the SCP. Most DOE commitments, however, deal with consideration of recommendations contained in SCP comments relevant to low-levels of technical planning detail (SCP Study Plans). Commitments are discharged when referred to the appropriate quality-affecting or management process whereupon their merits can be evaluated

  11. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  12. Hanford Integrated Planning Process: 1993 Hanford Site-specific science and technology plan

    International Nuclear Information System (INIS)

    1993-12-01

    This document is the FY 1993 report on Hanford Site-specific science and technology (S ampersand T) needs for cleanup of the Site as developed via the Hanford Integrated Planning Process (HIPP). It identifies cleanup problems that lack demonstrated technology solutions and technologies that require additional development. Recommendations are provided regarding allocation of funding to address Hanford's highest-priority technology improvement needs, technology development needs, and scientific research needs, all compiled from a Sitewide perspective. In the past, the S ampersand T agenda for Hanford Site cleanup was sometimes driven by scientists and technologists, with minimal input from the ''problem owners'' (i.e., Westinghouse Hanford Company [WHC] staff who are responsible for cleanup activities). At other times, the problem-owners made decisions to proceed with cleanup without adequate scientific and technological inputs. Under both of these scenarios, there was no significant stakeholder involvement in the decision-making process. One of the key objectives of HIPP is to develop an understanding of the integrated S ampersand T requirements to support the cleanup mission, (a) as defined by the needs of the problem owners, the values of the stakeholders, and the technology development expertise that exists at Hanford and elsewhere. This requires a periodic, systematic assessment of these needs and values to appropriately define a comprehensive technology development program and a complementary scientific research program. Basic to our success is a methodology that is defensible from a technical perspective and acceptable to the stakeholders

  13. Integrating climate change into the transportation planning process : final report

    Science.gov (United States)

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  14. Analysis and integration of spatial data for transportation planning.

    Science.gov (United States)

    2009-06-01

    Transportation planning requires substantial amounts of data and cooperation among transportation planning : agencies. Advances in computer technology and the increasing availability of geographic information : systems (GIS) are giving transportation...

  15. Consolidation of Contingency Data and Its Use in Computer Graphics to Plan Bare Base Facility Construction at a Forward Operating Location.

    Science.gov (United States)

    1983-09-01

    a number of Harvest Eagle kits positioned in Europe and the Pacific theaters (12). Harvest Bare, a prepackaged kit of prefabricated expandable...Environmental Studies. San Diego University. Ecological Assessment of Vandenberg Air Force Base, California. Volume III. Environ- mental Planning System

  16. Analyzing the Feasibility of Using Secure Application Integration Methodology (SAIM) for Integrating DON Enterprise Resource Planning (ERP) Applications

    National Research Council Canada - National Science Library

    Marin, Ramon

    2004-01-01

    ...) would provide useful information about a beneficial methodology. SAIM is analyzed, by accessing its step by step directions, for suitability in the integration of the Enterprise Resource Planning (ERP...

  17. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    Science.gov (United States)

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.

  18. Analyzing an Integrated Planning Approach Among Planning Scale and Sector a Case Study of Malang City's Vision as the City of Education

    OpenAIRE

    Amirudin, Akhmad; Fefta Wijaya, Andy; Yossomsakdi, Samrit

    2014-01-01

    Integrated planning is more needed by government today because of the complexity of problems and limited resources. Integrated planning can undertake the problems by giving comprehensive solution and provide how much resources are needed to reach the goal. Integrated planning approach is implied to provide better tools to guide actions towards the development of cities, improvement of human conditions, and ultimately a better urbanism. So the research focused on integrated planning in Malang ...

  19. Integrating Surface Water Management in Urban and Regional Planning, Case Study of Wuhan in China

    NARCIS (Netherlands)

    Du, N.

    2010-01-01

    The main goal of the study is to examine and develop a spatial planning methodology that would enhance the sustainability of urban development by integrating the surface water system in the urban and regional planning process. Theoretically, this study proposes that proactive-integrated policy and

  20. A Needs Analysis for Technology Integration Plan: Challenges and Needs of Teachers

    Science.gov (United States)

    Vatanartiran, Sinem; Karadeniz, Sirin

    2015-01-01

    Lack of technology leadership and technology integration plans are important obstacles for using technology effectively in schools. We carried out a large-scale study to be able to design a technology integration plan for one of the pilot provinces that Fatih Project was initiated. The purpose of this research is to examine the perceived…

  1. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  2. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11 Section 244.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD...

  3. Integrated production planning and water management in the food industry: A cheese production case study

    NARCIS (Netherlands)

    Pulluru, Sai Jishna; Akkerman, Renzo; Hottenrott, Andreas

    2017-01-01

    Efficient water management is increasingly relevant in the food industry. Exploiting water reuse opportunities in planning production activities is a key part of this. We study integrated water management and production planning in cheese production. For this, we develop a water-integrated lot

  4. The Capacity to Integrate and Deal with Environmental Issues in Local Transport Policy and Planning

    DEFF Research Database (Denmark)

    Hansen, Carsten Jahn

    2002-01-01

    The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes.......The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes....

  5. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    Science.gov (United States)

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  6. Contingency Management of Health Care Organizations: It Depends.

    Science.gov (United States)

    Olden, Peter C

    Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.

  7. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  8. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...

  9. Integration method of 3D MR spectroscopy into treatment planning system for glioblastoma IMRT dose painting with integrated simultaneous boost

    International Nuclear Information System (INIS)

    Ken, Soléakhéna; Cassol, Emmanuelle; Delannes, Martine; Celsis, Pierre; Cohen-Jonathan, Elizabeth Moyal; Laprie, Anne; Vieillevigne, Laure; Franceries, Xavier; Simon, Luc; Supper, Caroline; Lotterie, Jean-Albert; Filleron, Thomas; Lubrano, Vincent; Berry, Isabelle

    2013-01-01

    To integrate 3D MR spectroscopy imaging (MRSI) in the treatment planning system (TPS) for glioblastoma dose painting to guide simultaneous integrated boost (SIB) in intensity-modulated radiation therapy (IMRT). For sixteen glioblastoma patients, we have simulated three types of dosimetry plans, one conventional plan of 60-Gy in 3D conformational radiotherapy (3D-CRT), one 60-Gy plan in IMRT and one 72-Gy plan in SIB-IMRT. All sixteen MRSI metabolic maps were integrated into TPS, using normalization with color-space conversion and threshold-based segmentation. The fusion between the metabolic maps and the planning CT scans were assessed. Dosimetry comparisons were performed between the different plans of 60-Gy 3D-CRT, 60-Gy IMRT and 72-Gy SIB-IMRT, the last plan was targeted on MRSI abnormalities and contrast enhancement (CE). Fusion assessment was performed for 160 transformations. It resulted in maximum differences <1.00 mm for translation parameters and ≤1.15° for rotation. Dosimetry plans of 72-Gy SIB-IMRT and 60-Gy IMRT showed a significantly decreased maximum dose to the brainstem (44.00 and 44.30 vs. 57.01 Gy) and decreased high dose-volumes to normal brain (19 and 20 vs. 23% and 7 and 7 vs. 12%) compared to 60-Gy 3D-CRT (p < 0.05). Delivering standard doses to conventional target and higher doses to new target volumes characterized by MRSI and CE is now possible and does not increase dose to organs at risk. MRSI and CE abnormalities are now integrated for glioblastoma SIB-IMRT, concomitant with temozolomide, in an ongoing multi-institutional phase-III clinical trial. Our method of MR spectroscopy maps integration to TPS is robust and reliable; integration to neuronavigation systems with this method could also improve glioblastoma resection or guide biopsies

  10. Joint Integration Test Facility (JITF) Engineering II Performance Measurement Plans

    National Research Council Canada - National Science Library

    Boucher, Joanne

    2001-01-01

    ..., effectiveness, and accountability in federal programs and spending. The plan establishes six separate performance measurements, which correlate directly to customer satisfaction, Intelligence Mission Application (IMA...

  11. Interactive urban design using integrated planning requirements control

    NARCIS (Netherlands)

    Vries, de B.; Tabak, V.; Achten, H.H.

    2005-01-01

    Urban planning and urban design are separated disciplines. As a consequence, there is hardly any feedback from the urban design process to the urban planning process. To improve interaction between these two, an interactive urban design (IUD) tool has been developed. The tool is implemented in a

  12. Integrating smart grid solution into distribution network planning

    NARCIS (Netherlands)

    Grond, M.O.W.; Morren, J.; Slootweg, J.G.

    2013-01-01

    The planning of medium voltage (MV) distribution networks is a challenging optimization problem due to its scale, its inherent uncertainty, and non-linear nature. In the international technical literature, there are many different optimization models and methods available to approach this planning

  13. Integrating 3D Visualization and GIS in Planning Education

    Science.gov (United States)

    Yin, Li

    2010-01-01

    Most GIS-related planning practices and education are currently limited to two-dimensional mapping and analysis although 3D GIS is a powerful tool to study the complex urban environment in its full spatial extent. This paper reviews current GIS and 3D visualization uses and development in planning practice and education. Current literature…

  14. Integrated Rolling Stock Planning for Suburban Passenger Railways

    DEFF Research Database (Denmark)

    Thorlacius, Per

    of several million DKK per year. In addition to this, a substantial benefit can be gained by the way the models can automate the current, manual planning procedures. This will enable planners to invest more creativity and meticulousness into the planning process as a result of being liberated from manual...

  15. Demographic, Employment and Development Trends: The Need for Integrated Planning.

    Science.gov (United States)

    Farooq, Ghazi M.; MacKellar, F. Landis

    1990-01-01

    The authors contend that problems associated with rapid population growth in developing countries must be tackled through comprehensive planning. They discuss impacts of demography on labor supply and demand and migration. Then they propose a practical framework for population and human resource development planning and policy formation. (SK)

  16. Sustainable cities: challenges of an integrated planning approach

    NARCIS (Netherlands)

    Nijkamp, Peter; Geenhuizen, van Marina

    1995-01-01

    This paper will identify specific planning conditions that arise when planning aims at sustainable development. First, attention will be paid tosocio-ethical attitudes toward sustainability issues and to the reasons why much of the sustainability debate deserves an urban focus. Then,

  17. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    International Nuclear Information System (INIS)

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-01-01

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  18. Cost, cost-efficiency and cost-effectiveness of integrated family planning and HIV services.

    Science.gov (United States)

    Shade, Starley B; Kevany, Sebastian; Onono, Maricianah; Ochieng, George; Steinfeld, Rachel L; Grossman, Daniel; Newmann, Sara J; Blat, Cinthia; Bukusi, Elizabeth A; Cohen, Craig R

    2013-10-01

    To evaluate costs, cost-efficiency and cost-effectiveness of integration of family planning into HIV services. Integration of family planning services into HIV care and treatment clinics. A cluster-randomized trial. Twelve health facilities in Nyanza, Kenya were randomized to integrate family planning into HIV care and treatment; six health facilities were randomized to (nonintegrated) standard-of-care with separately delivered family planning and HIV services. We assessed costs, cost-efficiency (cost per additional use of more effective family planning), and cost-effectiveness (cost per pregnancy averted) associated with the first year of integration of family planning into HIV care. More effective family planning methods included oral and injectable contraceptives, subdermal implants, intrauterine device, and female and male sterilization. We collected cost data through interviews with study staff and review of financial records to determine costs of service integration. Integration of services was associated with an average marginal cost of $841 per site and $48 per female patient. Average overall and marginal costs of integration were associated with personnel costs [initial ($1003 vs. $872) and refresher ($498 vs. $330) training, mentoring ($1175 vs. $902) and supervision ($1694 vs. $1636)], with fewer resources required for other fixed ($18 vs. $0) and recurring expenses ($471 vs. $287). Integration was associated with a marginal cost of $65 for each additional use of more effective family planning and $1368 for each pregnancy averted. Integration of family planning and HIV services is feasible, inexpensive to implement, and cost-efficient in the Kenyan setting, and thus supports current Kenyan integration policy.

  19. Optimal integration and test plans for software releases of lithographic systems

    NARCIS (Netherlands)

    Boumen, R.; Jong, de I.S.M.; Mortel - Fronczak, van de J.M.; Rooda, J.E.

    2007-01-01

    This paper describes a method to determine the optimal integration and test plan for embedded systems software releases. The method consists of four steps: 1)describe the integration and test problem in an integration and test model which is introduced in this paper, 2) determine possible test

  20. Alternative Forms of Fit in Contingency Theory.

    Science.gov (United States)

    Drazin, Robert; Van de Ven, Andrew H.

    1985-01-01

    This paper examines the selection, interaction, and systems approaches to fit in structural contingency theory. The concepts of fit evaluated may be applied not only to structural contingency theory but to contingency theories in general. (MD)

  1. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  2. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  3. A class solution for RapidArc prostate planning with simultaneous integrated boost

    International Nuclear Information System (INIS)

    Jolly, David; Alahakone, D.; Meyer, J.

    2010-01-01

    Full text: Standardised treatment planning procedures make the planning process for rotational IMRT more efficient and consistent. This may be achieved by applying the same planning strategy, or class solution, for each patient. In doing so it may be possible to achieve acceptable plans for each patient within a relatively short timeframe, whilst time consuming individual optimisation of the planning parameters can be avoided. Methods Tn this work, a robust and streamlined planning strategy is established with an emphasis on treating prostate patients with a simultaneous integrated boost RapidArc plan. This planning strategy outlines the field set up, recommended starting objectives, required user interactions to be made throughout optimisation and post optimisation adjustments. A comparative planning study-with static gantry IMRT -is then presented for ten prostate patients as justification for the planning strategy itself. Results A variety of parameters are evaluated relating to both the planning itself and the plans that result. Results of this comparative study are in line with previously published data and the planning process is streamlined to a point where the RapidArc optimisation and calculation time is 16.7 1.5 min collectively. Discussion and Conclusion Application of this planning strategy reduces the dependence of the produced plan on the experience of the planner and has the potential to streamline the planning process within radiotherapy departments. Modified applications of the strategy have also proved to be useful for the planning of other treatment sites.

  4. Integrated Test and Evaluation Flight Test 3 Flight Test Plan

    Science.gov (United States)

    Marston, Michael Lawrence

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  5. Generation Expansion Planning Considering Integrating Large-scale Wind Generation

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Østergaard, Jacob

    2013-01-01

    necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. A bi-level generation expansion planning approach considering large-scale wind generation was proposed in this paper. The first phase is investment decision, while the second phase is production...... optimization decision. A multi-objective PSO (MOPSO) algorithm was introduced to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of the proposed bi-level planning approach and the MOPSO...

  6. Contingent Conspiracies: Art, Philosophy, Science

    DEFF Research Database (Denmark)

    Wilson, Alexander

    2013-01-01

    The question of whether creativity comes from being “open” or “closed” to contingent processes, deeply intersects art-historical discourse on authorship, style, technique and practice: from the Greek notion of the Daimon, through commedia dell'arte’s improvised styles and romanticism’s investment......, Hegel) contain a deeper tension between contingency and necessity, often revealed in correlate discussions of the sublime. But as artists find themselves returning again to a concern or care for contingency (a thread running through Heidegger, Levinas and Derrida) or the question how to conspire...... with contingency (Negarestani), they do so today with a new paradigm of scientific knowledge at their disposal. For science too has increasingly been forced to respond to the notion of contingency. Progressively discovering the ubiquity of non-linear dynamics, deterministic chaos and emergent complexity...

  7. Integration of second cancer risk calculations in a radiotherapy treatment planning system

    International Nuclear Information System (INIS)

    Hartmann, M; Schneider, U

    2014-01-01

    Second cancer risk in patients, in particular in children, who were treated with radiotherapy is an important side effect. It should be minimized by selecting an appropriate treatment plan for the patient. The objectives of this study were to integrate a risk model for radiation induced cancer into a treatment planning system which allows to judge different treatment plans with regard to second cancer induction and to quantify the potential reduction in predicted risk. A model for radiation induced cancer including fractionation effects which is valid for doses in the radiotherapy range was integrated into a treatment planning system. From the three-dimensional (3D) dose distribution the 3D-risk equivalent dose (RED) was calculated on an organ specific basis. In addition to RED further risk coefficients like OED (organ equivalent dose), EAR (excess absolute risk) and LAR (lifetime attributable risk) are computed. A risk model for radiation induced cancer was successfully integrated in a treatment planning system. Several risk coefficients can be viewed and used to obtain critical situations were a plan can be optimised. Risk-volume-histograms and organ specific risks were calculated for different treatment plans and were used in combination with NTCP estimates for plan evaluation. It is concluded that the integration of second cancer risk estimates in a commercial treatment planning system is feasible. It can be used in addition to NTCP modelling for optimising treatment plans which result in the lowest possible second cancer risk for a patient.

  8. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  9. Data integration for statewide transportation planning : final report

    Science.gov (United States)

    2009-08-01

    The goal of this study was to investigate the data availability, accessibility, and interoperability issues arisen from the statewide : transportation planning activities undertaken at WisDOT and to identify possible approaches for addressing these i...

  10. Integrated Plan-Procedures-Telemetry Ops Concept and Prototype

    Data.gov (United States)

    National Aeronautics and Space Administration — The project scope includes developing the ops concept and prototype for a near-seamless interface between mission plans, electronic procedures and live telemetry...

  11. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  12. Integration of packaging design and planning into transportation

    International Nuclear Information System (INIS)

    Jarrell, R.F.

    1993-01-01

    In the past, numerous programs, projects, and design concepts for packaging and materials production have taken place without all the principal participants being involved in the up-front planning process. Many major facilities and packagings have been designed without the involvement of Transportation professionals. Unfortunately, Transportation has been overlooked and in most cases is a critical element that should have been included in the Planning process. (J.P.N.)

  13. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  14. Strategies Used by Facilities in Uganda to Integrate Family Planning ...

    African Journals Online (AJOL)

    Erah

    assistance and coaching from the core team, we integrated routine site/field operations. The performance of each site was monitored using the three FP-HIV care integration indicators – proportion of HIV-positive patients of reproductive age who were: 1) counseled on FP methods at every clinic visit, 2) using at least one FP ...

  15. Integrating multiple publics into the strategic plan. The best plans can be derailed without comprehensive up-front research.

    Science.gov (United States)

    Peltier, J W; Kleimenhagen, A K; Naidu, G M

    1996-01-01

    The mission of a health care organization represents its vision for the future. The authors present an approach used to develop an organizational mission for a large multispecialty physician clinic. In implementing the strategic planning process, research objectives must be clearly stated that identify in advance how the data will be used. Failure to integrate strategic data from all relevant publics will likely result in a mission statement that misses the significant interests of one or more stakeholders and reduces the effectiveness of the strategic planning process. Although costly, comprehensive research can uncover some surprising differences in perception that, if ignored, might complete defeat strategic planning efforts.

  16. The DOE Office of Environmental Restoration and Waste Management comprehensive integrated planning process

    International Nuclear Information System (INIS)

    Aiken, R.J.; Draffin, C.W. Jr.; Pflock, K.T.

    1992-01-01

    This paper reports that comprehensive integrated planning is critical to the ultimate success of the DOE Office of Environmental Restoration and Waste Management's (EM) program because of the significant technical and institutional complexities, the tens of billions of dollars required, the regulatory and fiscal uncertainty, and the multitude of federal, state, and private sector organizations involved. Using the philosophy that sound and forward looking planning should guide budgetary and management decisionmaking, and that clear priorities are essential to program success, EM's comprehensive approach includes strategic planning, the annually updated EM Five-Year Plan, the EM Management Plan, and Site Specific Plans. Roadmaps (which facilitate issue identification and resolution), Activity Data Sheets, prioritization methodologies, and installation-specific Progress Charts are among the tools employed in support of the EM integrated planning process

  17. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  18. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  19. Strategic workforce planning for a multihospital, integrated delivery system.

    Science.gov (United States)

    Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience

    2012-01-01

    Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.

  20. Integrated production-distribution planning optimization models: A review in collaborative networks context

    Directory of Open Access Journals (Sweden)

    Beatriz Andres

    2017-01-01

    Full Text Available Researchers in the area of collaborative networks are more and more aware of proposing collaborative approaches to address planning processes, due to the advantages associated when enterprises perform integrated planning models. Collaborative production-distribution planning, among the supply network actors, is considered a proper mechanism to support enterprises on dealing with uncertainties and dynamicity associated to the current markets. Enterprises, and especially SMEs, should be able to overcome the continuous changes of the market by increasing their agility. Carrying out collaborative planning allows enterprises to enhance their readiness and agility for facing the market turbulences. However, SMEs have limited access when incorporating optimization tools to deal with collaborative planning, reducing their ability to respond to the competition. The problem to solve is to provide SMEs affordable solutions to support collaborative planning. In this regard, new optimisation algorithms are required in order to improve the collaboration within the supply network partners. As part of the H2020 Cloud Collaborative Manufacturing Networks (C2NET research project, this paper presents a study on integrated production and distribution plans. The main objective of the research is to identify gaps in current optimization models, proposed to address integrated planning, taking into account the requirements and needs of the industry. Thus, the needs of the companies belonging to the industrial pilots, defined in the C2NET project, are identified; analysing how these needs are covered by the optimization models proposed in the literature, to deal with the integrated production-distribution planning.

  1. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  2. Integration of Neural Networks and Cellular Automata for Urban Planning

    Institute of Scientific and Technical Information of China (English)

    Anthony Gar-on Yeh; LI Xia

    2004-01-01

    This paper presents a new type of cellular automata (CA) model for the simulation of alternative land development using neural networks for urban planning. CA models can be regarded as a planning tool because they can generate alternative urban growth. Alternative development patterns can be formed by using different sets of parameter values in CA simulation. A critical issue is how to define parameter values for realistic and idealized simulation. This paper demonstrates that neural networks can simplify CA models but generate more plausible results. The simulation is based on a simple three-layer network with an output neuron to generate conversion probability. No transition rules are required for the simulation. Parameter values are automatically obtained from the training of network by using satellite remote sensing data. Original training data can be assessed and modified according to planning objectives. Alternative urban patterns can be easily formulated by using the modified training data sets rather than changing the model.

  3. A mini-integrated resource plan for a commercial entity in Gauteng Province: planning for energy autonomous businesses

    CSIR Research Space (South Africa)

    Senatla, Mamahloko

    2017-08-01

    Full Text Available their electricity demand using PV at least cost. This paper conducts a mini-integrated resource plan using PLEXOS modelling tool for a commercial entity located in Gauteng with a peak capacity of 6MW. The results show that investing in optimal PV capacity by 2030...

  4. Guidelines for the integrated planning and design of underground coal mines.

    CSIR Research Space (South Africa)

    Fourie, GA

    2001-11-01

    Full Text Available Mine planning and design involves the compilation and integration of all relevant geological, geotechnical, mining, engineering and economic data into a single document to define and describe the exploitation strategy for a particular mineral...

  5. Tribal Waste Journal: What Is an Integrated Waste Management Plan (Issue 7)

    Science.gov (United States)

    Integrated Waste Management Plans (IWMPs) may offer tribes an efficient and cost-effective way to reduce open dumping, effectively manage solid waste, and protect human health and the environment for this generation and the next.

  6. Contemplating ‘Quality Street’ : integration of environmental quality in planning sustainable urban development

    NARCIS (Netherlands)

    van Stigt, M.

    2016-01-01

    The challenge of sustainable urban development entails integration of environmental interests in decision-making about urban plans. In practice, this is not always successful. This dissertation offers explanations and suggests some strategies for further improvement. Three different perspectives are

  7. Integrated vehicle-based safety systems (IVBSS) : light vehicle platform field operational test data analysis plan.

    Science.gov (United States)

    2009-12-22

    This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...

  8. Integrated vehicle-based safety systems (IVBSS) : heavy truck platform field operational test data analysis plan.

    Science.gov (United States)

    2009-11-23

    This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...

  9. Weather integration in TMC operations : a self-evaluation and planning guide.

    Science.gov (United States)

    2009-04-01

    This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...

  10. A pre-feasibility case study on integrated resource planning including renewables

    International Nuclear Information System (INIS)

    Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.

    2008-01-01

    In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables

  11. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  12. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ICM proje...

  13. Integration of environmental flow assessment and freshwater conservation planning: a new era in catchment management

    CSIR Research Space (South Africa)

    Nel, JL

    2011-03-01

    Full Text Available Integrated water resources management offers an ideal platform for addressing the goals of freshwater conservation and climate change adaptation. Environmental flow assessment and systematic conservation planning have evolved separately...

  14. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  15. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  16. Integrated Motion Planning and Autonomous Control Technology for Autonomous ISR, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SSCI and MIT propose to design, implement and test a comprehensive Integrated Mission Planning \\ (ii) Develop, Implement (iii) Develop, Implement and (iii) Carry...

  17. Groups as a part of integrated treatment plans : Inpatient psychotherapy for outpatients?

    NARCIS (Netherlands)

    Staats, H

    2005-01-01

    Group psychotherapy in Germany is well established as part of an integrative treatment plan in inpatient treatment. Outpatient group psychotherapy, however, is conceptualized as a separate treatment option in competition with individual therapy. German guidelines for outpatient psychotherapy exclude

  18. Planning for Integrated Transport in Indonesia: Some Lessons from the UK’s Experience

    Directory of Open Access Journals (Sweden)

    Yos Sunitiyoso

    2012-01-01

    Full Text Available Traffic congestion has been a major problem in many cities in Indonesia, thus requiring abetter transport policy. Many developed countries, including the United Kingdom, has beenimplementing the integrated transport policy to replace traditional transport policy that focuson only building roads to anticipate traffic demand. This paper provides a highlight on theimplementation of integrated transport policy in the United Kingdom. Some key issues thatcan be learnt by the Indonesian government from their experience are discussed. This includesthe integration within and between all types of transport, integration with land use planning,integration with environment policy and integration with policies for education, health andwealth creations. In the implementation, the policy requires continuity and stability inorganization and politics, coordination in local transport plans, more devolution on powerand revenue funding from the government in addition to capital funding.Key words: traffic congestion, integrated transport policy

  19. Cost estimating issues in the Russian integrated system planning context

    International Nuclear Information System (INIS)

    Allentuck, J.

    1996-01-01

    An important factor in the credibility of an optimal capacity expansion plan is the accuracy of cost estimates given the uncertainty of future economic conditions. This paper examines the problems associated with estimating investment and operating costs in the Russian nuclear power context over the period 1994 to 2010

  20. Integrating Strategic Planning Concepts into the Negotiating Process.

    Science.gov (United States)

    Winer, Toby R.; Winer, Russell S.

    1987-01-01

    The purchase of a new telecommunications system at Vanderbilt University is described. By understanding conditions in which buyers generally obtain leverage over sellers in industries, it was possible to improve negotiating power. Strategic-planning concepts developed by Michael Porter in his book "Competitive Strategy" were used as a…

  1. Cornerstone: Foundational Models and Services for Integrated Battle Planning

    Science.gov (United States)

    2012-06-01

    We close with a summary of future planned research. 3 Cross-Domain Knowledge Representation One of the primary reasons behind the...mission data using Google Earth to display the results of a Keyhole Markup Language (KML) mission data translator. Finally, we successfully ran Thread 1

  2. Planning integrated system and energy trading; Sistema integrado de planejamento e comercializacao de energia

    Energy Technology Data Exchange (ETDEWEB)

    Pizzatto, Wilson Tadeu; Ferreira, Luiz Roberto Morgenstern; Bloot, Marcio Luiz; Carneiro, Carlos Fernando Bley [Companhia Paranaense de Energia (COPEL), Curitiba, PR (Brazil)]. E-mails: pizzatto@copel.com; luiz.roberto@copel.com; mlbloot@copel.com; carlos.bley@copel.com; Bessa, Marcelo Rodrigues; Favoreto, Rafael de Souza [LACTEC - Instituto de Tecnologia para o Desenvolvimento, Curitiba, PR (Brazil)]. E-mails: bessa@lactec.org.br; favoreto@lactec.org.br

    2006-07-01

    In a complex system as the one composed by Brazilian Power Plants and connecting grid, with many associated risks, it is important to a Generation Company to use computer programs that help the decision making process in planning and energy commercialization areas. This paper describes the necessary steps to obtain a Integrated Planning and Energy Commercialization System which aims to measure the profitability of Brazilian Generation Company working in an Integrated Electric System based on hydropower generation. (author)

  3. Strategic plan modelling by hospital senior administration to integrate diversity management.

    Science.gov (United States)

    Newhouse, John J

    2010-11-01

    Limited research suggests that some hospital senior administrators and chief executive officers (CEOs) have employed a strategic planning function to achieve diversity management practices. As the hospital industry struggles with how to integrate diversity practices to improve patient satisfaction, increase the quality of care and enhance clinical outcomes for minority populations, understanding the planning process involved in this endeavour becomes significant for senior hospital administrators. What is not well understood is what this strategic planning process represents and how it is applied to integrate diversity management. Scant research exists about the type of strategic models that hospital CEOs employ when they wish to reposition their organizations through diversity management. This study examines the strategic planning models used by senior administrators to integrate diversity management for an institutional-wide agenda. A qualitative survey process was used for CEOs in the states of New York, Pennsylvania, New Jersey and Delaware. The key research questions dealt with what type of strategic plan approach senior administrators used for integrating diversity management and what rationale they used to pursue this. Significant differences were reported between three types of strategic plan modelling used by CEOs. Also, when comparing past and current practices over time, such differences existed. The need to integrate diversity management is underscored by this study. How senior hospital administrators apply strategic plan models and what impact these approaches have represent the major implications that this study offers.

  4. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment

  5. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.

  6. Integrated energy planning: Strategies to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz, Johnny N; Sheffield, John W [University of Missouri-Rolla (United States)

    1997-07-01

    The framework convention on climate change, signed by more than 150 governments worldwide in June 1992, calls on parties to the convention undertaken inventories of national sources and sinks of greenhouse gases and to develop plans for responding to climate change. The energy sector is comprised of the major energy demand sectors (industry, residential and commercial, transport and agriculture), and the energy supply sector, which consists of resource extraction, conversion, and delivery of energy products. Greenhouse Gas (GHG) emissions occur at various points in the sector, from resource extraction to end use application, and accordingly, options for mitigation exist at various points. In most countries, will be a major focus of GHG mitigation analysis. The primary focus of this paper is on the identification of strategies that can mitigate climate changes on the basis of integrated energy planing analysis. The overall approach follows a methodology developed by the U.S. Country Studies Program under the framework of the Convention's commitments. It involves the development of scenarios based on energy uses and evaluation of specific technologies that can satisfy demands for energy services. One can compare technologies based on their relative cost to achieve a unit of GHG reduction and other features of interest. This approach gives equal weight to both energy supply and energy demand options. A variety of screening criteria including indicators of cost-effectiveness as well as non-economic analysis concerns, can be used to identify and assess promising options, which can then be combined to create one or more scenarios. Mitigation scenarios are evaluated against the backdrop of a baseline scenario, which simulates assumed to take place in the absence of mitigation efforts. Mitigation scenarios can be designed to meet specific emission reduction targets or to simulate the effect of specific policy inventions. The paper ends with an application using a

  7. Integrated planning in supply chains with buy-side and sell-side

    Indian Academy of Sciences (India)

    Supply chain management; dynamic pricing; partner selection; supply chain planning; electronic marketplaces. Abstract. In this paper we develop a quadratic programming model for partner selection and planning in integrated supply chain networks embedded with both sell-side and buy-side electronic marketplaces.

  8. An MILP approach to shelf life integrated planning and scheduling in scalded sausage production

    DEFF Research Database (Denmark)

    Günther, H.O.; van Beek, P.; Grunow, Martin

    2006-01-01

    in which shelf life aspects are integrated into operational production planning and scheduling functions. Specifically we make use of so-called Mixed Integer Linear Programming (MILP) models. Our research is based on an industrial case study of yogurt production. Relying on the principle of block planning...

  9. Sulfur Dioxide (SO2) Primary NAAQS Review: Integrated Review Plan - Advisory with CASAC

    Science.gov (United States)

    The SO2 Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-...

  10. Integrated watershed management: a planning methodology for construction of new dams in Ethiopia

    NARCIS (Netherlands)

    Bezuayehu, Tefera; Stroosnijder, L.

    2007-01-01

    Integrated watershed management (IWM) is emerging as an alternative to the centrally planned and sectoral approaches that currently characterize the planning process for dam construction in Ethiopia. This report clarifies the concept of IWM, and reviews the major social, environmental and economic

  11. An Integrative Approach to Value-Added Planning: From Community Needs to Local Authority Revenue

    NARCIS (Netherlands)

    Cilliers, E.J.; Timmermans, W.

    2015-01-01

    The concept of value-added planning (as part of the Valuing Attractive Landscapes in the Urban Economy, INTERREG IVB North West Europe Project) is introduced in this paper to facilitate integrative planning, focusing on the benefits that use and non-use green spaces can provide to an urban area. The

  12. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    Science.gov (United States)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  13. Fuels planning: science synthesis and integration; fact sheet: The Fuels Synthesis Project overview

    Science.gov (United States)

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    The geographic focus of the "Fuels Planning: Science Synthesis and Integration" project #known as the Fuels Synthesis Project# is on the dry forests of the Western United States. Target audiences include fuels management specialists, resource specialists, National Environmental Policy Act #NEPA# planning team leaders, line officers in the USDA Forest Service...

  14. Integration of fisheries into marine spatial planning: Quo vadis?

    DEFF Research Database (Denmark)

    Janssen, Holger; Bastardie, Francois; Eero, Margit

    2018-01-01

    fails. In this article, we review the state of the art and latest progress in research on various challenges in the integration of fisheries into MSP. The reviewed studies address a wide range of integration challenges, starting with techniques to analyse where fishermen actually fish, assessing...... in the future, and finally, examining how fisheries could benefit from MSP. This paper gives an overview of the latest developments on concepts, tools, and methods. It becomes apparent that the spatial and temporal dynamics of fish and fisheries, as well as the definition of spatial preferences, remain major...

  15. Development process for integrated water resources management plan under a bottom-up participation perspective

    Directory of Open Access Journals (Sweden)

    Kittiwet Kuntiyawichai

    2014-06-01

    Full Text Available This article presents the development process for the integrated water resources management and development plan of Maha Sarakham Province by considering the priority and urgency of water problem issues. Gathering feedback from stakeholders and prioritizing water management and development projects are also taken into consideration. In view of integrated plans, the project is classified into short-, medium- and long-term plans with the project duration of 2 years, 3 years and 5 years, respectively. In this case, the plans can be categorized into proposed provincial and local plans. Firstly, the comprehensive provincial plans can be divided into 2 groups, i.e. district plans with the total number of 532 plans, which comprise of 505 projects for coping with drought and 27 projects for flood mitigation, and provincial plans from 13 agencies with the amount of 513 projects, which include 396 projects and 117 projects for dealing with drought and flood, respectively. Secondly, there are 4,099 of local plans to be put in place, in which 3,973 projects and 126 projects are proposed to handle drought and flood problems, respectively. From the analysis, it is found that if all planned drought relief projects are implemented, the water demand for domestic and agricultural needs could be covered by 96% and 51%, respectively. In case of the entire proposed flood alleviation projects are executed, 29% of the total flood prone areas can be effectively protected.

  16. Integrated planning for nuclear siting - The South African experience

    Energy Technology Data Exchange (ETDEWEB)

    Hobbs, J C.A.; Heidstra, N; Graupner, O F [Eskom, Johannesburg (South Africa); Hambleton-Jones, B [Atomic Energy Corporation of South Africa Ltd., Pellindaba, Pretoria (South Africa)

    1990-06-01

    This paper describes the process involved in the current national programme to identify potential sites for nuclear power development in South Africa. A description is given of the sensitivity studies - the evaluation of the potential perturbations to and opportunities for the biophysical and socioeconomic environments and the suitability studies - the evaluation of environmental influences on geotechnical, safety and financial considerations. This programme is divorced from any decision of whether or not to build further nuclear power station in South Africa. The programme described is a long range land-use planning exercise considered expedient in the face of competition for land that share similar requirements as those of nuclear power station sites. It is also designed to streamline nuclear power station lead times and to make national and regional planners aware of Eskom's requirements in the drafting of their policies and plans. (author)

  17. Integrated planning for nuclear siting - The South African experience

    International Nuclear Information System (INIS)

    Hobbs, J.C.A.; Heidstra, N.; Graupner, O.F.; Hambleton-Jones, B.

    1990-01-01

    This paper describes the process involved in the current national programme to identify potential sites for nuclear power development in South Africa. A description is given of the sensitivity studies - the evaluation of the potential perturbations to and opportunities for the biophysical and socioeconomic environments and the suitability studies - the evaluation of environmental influences on geotechnical, safety and financial considerations. This programme is divorced from any decision of whether or not to build further nuclear power station in South Africa. The programme described is a long range land-use planning exercise considered expedient in the face of competition for land that share similar requirements as those of nuclear power station sites. It is also designed to streamline nuclear power station lead times and to make national and regional planners aware of Eskom's requirements in the drafting of their policies and plans. (author)

  18. Planning for Technology Integration in a Professional Learning Community

    Science.gov (United States)

    Thoma, Jennifer; Hutchison, Amy; Johnson, Debra; Johnson, Kurt; Stromer, Elizabeth

    2017-01-01

    Barriers to technology integration in instruction include a lack of time, resources, and professional development. One potential approach to overcoming these barriers is through collaborative work, or professional learning communities. This article focuses on one group of teachers who leveraged their professional learning community to focus on…

  19. Integrated development planning in South Africa: lessons for international peacebuiling?

    CSIR Research Space (South Africa)

    Gueli, R

    2007-01-01

    Full Text Available to overcome Apartheid’s violent history, deserves closer scrutiny by international peacebuilding experts. This is because South Africa’s approach to development – although not perfect – is centred on integrated governance and has, to some extent, played...

  20. Integration and test plans for complex manufacturing systems

    NARCIS (Netherlands)

    Boumen, R.

    2007-01-01

    The integration and test phases that are part of the development and manufacturing of complex manufacturing systems are costly and time consuming. As time-to-market is becoming increasingly important, it is crucial to keep these phases as short as possible, whilemaintaining system quality. This is

  1. Retirement Financial Planning and the RN: An Integrative Literature Review.

    Science.gov (United States)

    Keele, Shanna; Alpert, Patricia T

    2015-10-01

    This integrative literature review examined the current research on RN retirement. The review identified 3 critical gaps in knowledge: (a) minimal knowledge regarding the economic impact on RN retirement, (b) incomplete information regarding the demographics of RN retirement, and (c) a scarcity of prospective longitudinal RN workforce studies. Future research must address these gaps to better address RN workforce sustainability.

  2. Integration into What? Reflections on Development Planning for Women.

    Science.gov (United States)

    Boulding, Elise

    1980-01-01

    Integration of women into the existing international economic and technological order promises only further loss of autonomy and increased marginalization. Women's groups should explore human-centered development which will generate new social structures and new approaches to human productivity and welfare. (SK)

  3. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  4. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  5. Mini-Membrane Evaporator for Contingency Spacesuit Cooling

    Science.gov (United States)

    Makinen, Janice V.; Bue, Grant C.; Campbell, Colin; Petty, Brian; Craft, Jesse; Lynch, William; Wilkes, Robert; Vogel, Matthew

    2015-01-01

    The next-generation Advanced Extravehicular Mobility Unit (AEMU) Portable Life Support System (PLSS) is integrating a number of new technologies to improve reliability and functionality. One of these improvements is the development of the Auxiliary Cooling Loop (ACL) for contingency crewmember cooling. The ACL is a completely redundant, independent cooling system that consists of a small evaporative cooler--the Mini Membrane Evaporator (Mini-ME), independent pump, independent feedwater assembly and independent Liquid Cooling Garment (LCG). The Mini-ME utilizes the same hollow fiber technology featured in the full-sized AEMU PLSS cooling device, the Spacesuit Water Membrane Evaporator (SWME), but Mini-ME occupies only approximately 25% of the volume of SWME, thereby providing only the necessary crewmember cooling in a contingency situation. The ACL provides a number of benefits when compared with the current EMU PLSS contingency cooling technology, which relies upon a Secondary Oxygen Vessel; contingency crewmember cooling can be provided for a longer period of time, more contingency situations can be accounted for, no reliance on a Secondary Oxygen Vessel (SOV) for contingency cooling--thereby allowing a reduction in SOV size and pressure, and the ACL can be recharged-allowing the AEMU PLSS to be reused, even after a contingency event. The first iteration of Mini-ME was developed and tested in-house. Mini-ME is currently packaged in AEMU PLSS 2.0, where it is being tested in environments and situations that are representative of potential future Extravehicular Activities (EVA's). The second iteration of Mini-ME, known as Mini-ME2, is currently being developed to offer more heat rejection capability. The development of this contingency evaporative cooling system will contribute to a more robust and comprehensive AEMU PLSS.

  6. Mobile contingency unit

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Sergio O. da; Magalhaes, Milton P. de [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Junqueira, Rodrigo A.; Torres, Carlos A.R. [PETROBRAS Transporte S/A (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper is aimed at presenting what is already a reality in TRANSPETRO in the area covered by OSBRA, a pipeline that carries by-products to the Mid-West region of Brazil. In order to meet the needs of covering occasional accidents, TRANSPETRO counts on a standardized system of emergency management. It is a great challenge to secure an efficient communication along the 964 km of extension, considering that there are shadow zones where it is not possible to use conventional means of communication such as mobile telephony and internet. It was in this context that the Mobile Contingency Unit Via Satellite - MCU was developed, to extend the communication facilities existing in fixed installations to remote places, mainly the pipeline right of ways. In case of emergency, simulation and work in the pipeline right of way, MCU is fully able to provide the same data, voice, closed-circuit TV and satellite video conference facilities that are available in any internal area of the PETROBRAS system. (author)

  7. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  8. Planning for integration as a two way process : Perceptions from Toronto

    NARCIS (Netherlands)

    Ahmadi, D.; Tasan-Kok, M.T.

    2014-01-01

    Integration has evolved as a well-embraced discourse within theory and policy debates concerning the accommodation of newcomers. However, in today’s increasingly cosmopolitan cities of Europe planning for integration fails to properly address increasing diversity as it is often grounded in

  9. Designing a strategic plan development approach for integrated area development projects

    NARCIS (Netherlands)

    de Kort, Inge

    2009-01-01

    Increasingly, it has become evident that spatial problems can no longer be resolved in isolation, but should be solved in conjunction with other development-related issues. Interest in integrated area development is growing, and a more integrated planning approach is desired. In this design-based

  10. An integrated science plan for the Lake Tahoe basin: conceptual framework and research strategies

    Science.gov (United States)

    Zachary P. Hymanson; Michael W. Collopy

    2010-01-01

    An integrated science plan was developed to identify and refine contemporary science information needs for the Lake Tahoe basin ecosystem. The main objectives were to describe a conceptual framework for an integrated science program, and to develop research strategies addressing key uncertainties and information gaps that challenge government agencies in the theme...

  11. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  12. Standardized evaluation of simultaneous integrated boost plans on volumetric modulated arc therapy

    International Nuclear Information System (INIS)

    Yang Wensha; Jones, Ryan; Read, Paul; Benedict, Stanley; Sheng Ke

    2011-01-01

    The purpose of this paper is to quantify the capability of the RapidArc (RA) planning system to deliver highly heterogeneous doses for simultaneous integrated boost (SIB) in both a phantom and patients. A cylindrical planning target volume (PTV) with a diameter of 6 cm was created in a cylindrical phantom. A smaller boost tumor volume (BTV) in the PTV with varying diameters (0.625-2.5 cm), positions and shapes was also created. Five previously treated patients with brain tumors were included in the study. Original gross tumor volumes (average 41.8 cm 3 ) and PTVs (average 316 cm 3 ) were adopted as the BTV and the PTV in the new plans. 30 Gy was prescribed to the PTV. Doses varying from 35 to 90 Gy were prescribed to the BTV. Both SIB and sequential boost (SEQ) plans were created on RA to meet the prescription. A set of reference plans was also created on the helical tomotherapy (HT) platform. Normalized dose contrast (NDC) and the integral dose were used to evaluate the quality of plans. NDC was defined as the dose contrast between BTV and PTV-BTV, normalizing to the ideal scenario where the contrast is the ratio between prescribed doses to the BTV and PTV. NDC above 90% was observed with BTV dose less than 60 Gy. NDC was minimally affected by the size of BTV but adversely affected by the complexity of the shape of the BTV. In the phantom plans, a peak of NDC was observed with 45 Gy (150% of PTV dose) to the BTV; for BTVs at the center of the PTV, the increase in the integral dose was less than 2% and remained constant for all dose levels in the phantom plans but a linear increase in the integral dose was observed with the HT plans. In the patient plans, an 11% average increase in the integral dose was observed with SIB plans and 60 Gy to the BTV, lower than the 30% average increase in the SEQ plans by RA and 25% by HT. The study showed not only that SIB by RA can achieve superior plans compared with SEQ plans on the same platform and SIB plans on HT, but also the

  13. Scoping study of integrated resource planning needs in the public utility sector

    Energy Technology Data Exchange (ETDEWEB)

    Garrick, C J; Garrick, J M; Rue, D R [NEOS Corp., Lakewood, CO (United States)

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  14. Contingency Analysis Post-Processing With Advanced Computing and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin

    2017-07-01

    Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

  15. An Integrated Rolling Stock Planning Model for the Copenhagen Suburban Passenger Railway

    DEFF Research Database (Denmark)

    Thorlacius, Per; Larsen, Jesper; Laumanns, Marco

    A central issue for operators of passenger railways is providing sufficient number of seats for passengers while at the same time minimising operating costs. This is the task of rolling stock planning. Due to the large number of practical, railway specific requirements that a rolling stock plan has...... to take into account, rolling stock plans are often constructed in a step-by-step manner, taking some requirements into consideration in each step. This may make it difficult in the final step to produce a plan that is feasible with regard to all of the requirements and at the same time economically...... attractive. This paper proposes an integrated rolling stock planning model that simultaneously takes into account all practical requirements for rolling stock planning at DSB S-tog, the suburban passenger train operator of the City of Copenhagen. The model is then used to improve existing rolling stock plans...

  16. An integrated rolling stock planning model for the Copenhagen suburban passenger railway

    DEFF Research Database (Denmark)

    Thorlacius, Per; Larsen, Jesper; Laumanns, Marco

    2015-01-01

    A central issue for operators of passenger railways is providing sufficient number of seats for passengers while at the same time minimising operating costs. This is the task of rolling stock planning. Due to the large number of practical, railway specific requirements that a rolling stock plan has...... to take into account, rolling stock plans are often constructed in a step-by-step manner, taking some requirements into consideration in each step. This may make it difficult in the final step to produce a plan that is feasible with regard to all of the requirements and at the same time economically...... attractive. This paper proposes an integrated rolling stock planning model that simultaneously takes into account all practical requirements for rolling stock planning at DSB S-tog, the suburban passenger train operator of the City of Copenhagen. The model is then used to improve existing rolling stock plans...

  17. Integrating manufacturing softwares for intelligent planning execution: a CIIMPLEX perspective

    Science.gov (United States)

    Chu, Bei Tseng B.; Tolone, William J.; Wilhelm, Robert G.; Hegedus, M.; Fesko, J.; Finin, T.; Peng, Yun; Jones, Chris H.; Long, Junshen; Matthews, Mike; Mayfield, J.; Shimp, J.; Su, S.

    1997-01-01

    Recent developments have made it possible to interoperate complex business applications at much lower costs. Application interoperation, along with business process re- engineering can result in significant savings by eliminating work created by disconnected business processes due to isolated business applications. However, we believe much greater productivity benefits can be achieved by facilitating timely decision-making, utilizing information from multiple enterprise perspectives. The CIIMPLEX enterprise integration architecture is designed to enable such productivity gains by helping people to carry out integrated enterprise scenarios. An enterprise scenario is triggered typically by some external event. The goal of an enterprise scenario is to make the right decisions considering the full context of the problem. Enterprise scenarios are difficult for people to carry out because of the interdependencies among various actions. One can easily be overwhelmed by the large amount of information. We propose the use of software agents to help gathering relevant information and present them in the appropriate context of an enterprise scenario. The CIIMPLEX enterprise integration architecture is based on the FAIME methodology for application interoperation and plug-and-play. It also explores the use of software agents in application plug-and- play.

  18. Aboveground Injection Sytem Construction and Mecahnical Integrity Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Li, Jun [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    An In-Situ Bioremediation (ISB) Pilot Test Treatability Study is planned at Sandia National Laboratories, New Mexico (SNL/NM) Technical Area-V (TA-V) Groundwater Area of Concern. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater using an injection well. The constituents of concern (COCs) are nitrate and trichloroethene (TCE). The Pilot Test Treatability Study will evaluate the effectiveness of bioremediation and COC treatment over a prescribed period of time. Results of the pilot test will provide data that will be used to evaluate the cost and effectiveness of a fullscale system.

  19. Integrating robust timetabling in line plan optimization for railway systems

    DEFF Research Database (Denmark)

    Burggraeve, Sofie; Bull, Simon Henry; Lusby, Richard Martin

    The line planning problem in rail is to select a number of lines froma potential pool which provides sufficient passenger capacity and meetsoperational requirements, with some objective measure of solution linequality. We model the problem of minimizing the average passenger systemtime, including...... frequency-dependent estimates for switching between lines,working with the Danish rail operator DSB and data for Copenhagen commuters.We present a multi-commodity flow formulation for the problemof freely routing passengers, coupled to discrete line-frequency decisionsselecting lines from a predefined pool...

  20. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.