WorldWideScience

Sample records for installation sites

  1. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  2. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  3. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  4. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  5. Meteorological characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.

    1988-01-01

    The atmosphere is the most propitious medium to a rapid transport and diffusion of a pollutant. So, it is important to know its local characteristics which is decisive for every evaluation of radioactive release consequences using transfer models. It is also the siege of intense sudden hazardous phenomena, as tornados and typhoons, that should be taken into account in the installation conception. 1 tab., 6 refs. (F.M.)

  6. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  7. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  8. Safety aspects of geological studies around nuclear installations sites

    International Nuclear Information System (INIS)

    Faure, J.

    1988-01-01

    The experience of geological studies of about forty french nuclear sites allows to set out the objectives, the phases and the geographic extensions of workings to be realized for confirming a site. The data to be collected for the safety analysis are specified; they concern the local and regional geology, the geotechnical characteristics and the essential elements for evaluating the hazards related to the soil liquefaction, the surface fracturing and in some cases the volcanic risks. It is necessary to follow up the geology during the installation construction and life. 8 refs. (F.M.)

  9. Seismic Hazard Assessment in Site Evaluation for Nuclear Installations: Ground Motion Prediction Equations and Site Response

    International Nuclear Information System (INIS)

    2016-07-01

    The objective of this publication is to provide the state-of-the-art practice and detailed technical elements related to ground motion evaluation by ground motion prediction equations (GMPEs) and site response in the context of seismic hazard assessments as recommended in IAEA Safety Standards Series No. SSG-9, Seismic Hazards in Site Evaluation for Nuclear Installations. The publication includes the basics of GMPEs, ground motion simulation, selection and adjustment of GMPEs, site characterization, and modelling of site response in order to improve seismic hazard assessment. The text aims at delineating the most important aspects of these topics (including current practices, criticalities and open problems) within a coherent framework. In particular, attention has been devoted to filling conceptual gaps. It is written as a reference text for trained users who are responsible for planning preparatory seismic hazard analyses for siting of all nuclear installations and/or providing constraints for anti-seismic design and retrofitting of existing structures

  10. INSTALLATION OF A BUYING AGENT ON THE CERN SITE

    CERN Multimedia

    Head of SPL Division

    1999-01-01

    In March, the Finance Committee approved the installation of a Buying Agent on the CERN site to process orders with a value below 5,000 CHF.The role of a Buying Agent is to supply low-cost products that are widely available on the market to a number of different clients. By purchasing quantities far in excess of CERN's own requirements, the Buying Agent is thus able to obtain better prices.In addition, the Agent must guarantee that purchasing requests are handled within a given time and that the product exactly matches users' needs; he must also check that the article delivered is the one ordered, and follow up all disputes and delivery delays.To offer you these services, the company LOGITRADE will be setting up office on the CERN site - Building 73, floor 3 - as of 3 May 1999 (phone No. 72280 _ 79167). Seen from the users, this company will have the same task as any other purchasing office on the site.Internal Purchase Requisitions (DAI) for a value of less than 5,000 CHF relating, initially, to computer con...

  11. Ecological and radioecological studies of nuclear installation sites

    International Nuclear Information System (INIS)

    Caries, J. C.; Hugon, J.; Grauby, A.

    1988-01-01

    The site study method consists of a dynamic and estimated analysis and of following up the release impact on all natural or non natural media compartments that take a part in the protection of man and his environment. The stages of knowing a nuclear site include the site preliminary radioecological evaluation, diffusion parameters evaluation, the quantification of factors of radioelements transfer to man, the ecological baseline carrying out, the radioactive baseline establishment, the radioecological synthesis of the results, the site radioactive and ecological control. This method applys to selection and detailed study of site. 1 tab., 7 refs. (F.M.)

  12. Site release in the decommissioning of nuclear installations

    International Nuclear Information System (INIS)

    Revilla, Jose Luis; Sanz, Maria Teresa; Marugan, Inmaculada; Simon, Inmaculada; Martin, Manuel; Solis, Susana; Sterling, Agustina

    2008-01-01

    Spanish regulatory framework for the decommissioning process of a nuclear facility ends up with a decommission statement, which releases the licence-holder of the facility from its responsibilities as an operator. It also establishes -where a restricted site release applies- the appropriate future use restrictions, and the responsible of both maintaining such restrictions and ensuring their compliance. Releasing a site implies eliminating all radiological monitoring. The Regulations, however, did not specify either the radiological conditions to be met for the site to be released, or the possibility of a partial release -with or without restrictions-. In case of restricted site release, the Regulations did not specify either the required criteria for such a release. This paper presents the main features of the Safety Instruction IS-13 'Radiological criteria for the release of nuclear facilities sites' issued recently by the Spanish Nuclear Safety Council as a new specific regulation. This Safety Instruction establishes the requirements and conditions for the release of nuclear facility sites, that is, radiological criteria on the effective dose to the public, partial release of nuclear facility sites and restricted release of nuclear facility sites. (author).

  13. Seismic Hazards in Site Evaluation for Nuclear Installations. Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-08-15

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear installations. It supplements the Safety Requirements publication on Site Evaluation for Nuclear Installations. The present publication provides guidance and recommends procedures for the evaluation of seismic hazards for nuclear power plants and other nuclear installations. It supersedes Evaluation of Seismic Hazards for Nuclear Power Plants, IAEA Safety Standards Series No. NS-G-3.3 (2002). In this publication, the following was taken into account: the need for seismic hazard curves and ground motion spectra for the probabilistic safety assessment of external events for new and existing nuclear installations; feedback of information from IAEA reviews of seismic safety studies for nuclear installations performed over the previous decade; collective knowledge gained from recent significant earthquakes; and new approaches in methods of analysis, particularly in the areas of probabilistic seismic hazard analysis and strong motion simulation. In the evaluation of a site for a nuclear installation, engineering solutions will generally be available to mitigate, by means of certain design features, the potential vibratory effects of earthquakes. However, such solutions cannot always be demonstrated to be adequate for mitigating the effects of phenomena of significant permanent ground displacement such as surface faulting, subsidence, ground collapse or fault creep. The objective of this Safety Guide is to provide recommendations and guidance on evaluating seismic hazards at a nuclear installation site and, in particular, on how to determine: (a) the vibratory ground motion hazards, in order to establish the design basis ground motions and other relevant parameters for both new and existing nuclear installations; and (b) the potential for fault displacement and the rate of fault displacement that could affect the feasibility of the site or the safe operation of the installation at

  14. Regulatory Aspects for Site Selection for Radiological and Nuclear Installations

    International Nuclear Information System (INIS)

    Sirag, N.M.

    2016-01-01

    The purpose of this research is to check in one of the considerations necessary for any new nuclear facility. A previous study that was conducted using a questionnaire reported that general admission to the public, aesthetic considerations, and characteristics associated with the site are able to adequately accept the existence of new nuclear facilities. The findings of this research revealed that public involvement in the process of site selection and in the design of nuclear power plants, an understanding of their point of view is an important aspect of a participatory approach. An important factor for any new nuclear program is to improve confidence in the energy choices in the future. A survey was conducted on 1304 adults to, to get the main goal. The study concluded showed that the prevalence of culture of safety reflected on the public acceptance of the site, especially if it takes into account the aesthetic and environmental considerations.

  15. Lifetime Evaluation of Grid-Connected PV Inverters Considering Panel Degradation Rates and Installation Sites

    OpenAIRE

    Sangwongwanich, Ariya; Yang, Yongheng; Sera, Dezso; Blaabjerg, Frede

    2018-01-01

    Lifetime of PV inverters is affected by the installation sites related to different solar irradiance and ambient temperature profiles (also referred to as mission profiles). In fact, the installation site also affects the degradation rate of the PV panels, and thus long-term energy production and reliability. Prior-art lifetime analysis in PV inverters has not yet investigated the impact of PV panel degradations. This paper thus evaluates the lifetime of PV inverters considering panel degrada...

  16. Risks due to industrial activities and to transports around nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    In order to verify that the human activities around a site under consideration are not incompatible with the installation conception, they should be analyzed before the definitive site selection, then watched over and if necessary limited during the installation construction and operation. Taking account of the aggression sources diversity, there is to consider different distances according to the risks. 6 tabs., 5 refs. (F.M.)

  17. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  18. Lifetime Evaluation of PV Inverters considering Panel Degradation Rates and Installation Sites

    DEFF Research Database (Denmark)

    Sangwongwanich, Ariya; Yang, Yongheng; Sera, Dezso

    2017-01-01

    The PV inverter lifetime is affected by the installed sites related to different solar irradiance and ambient temperature profiles. In fact, the installation site also affects the PV panel degradation rate, and thus the long-term power production. Prior-art lifetime analysis in PV inverters has...... not yet investigated the impact of panel degradation. This paper thus evaluates the lifetime of PV inverters considering panel degradation rates and installation sites. Evaluations have been carried out on PV systems installed in Denmark and Arizona. The results reveal that the PV panel degradation rate...... has a considerable impact on the PV inverter lifetime, especially in the hot climate (e.g., Arizona), where the panel degrades at a faster rate. In that case, the PV inverter lifetime estimation can be deviated by 54%, if the impact of PV panel degradation is not taken into account....

  19. A Low Cost Shading Analyzer and Site Evaluator Design to Determine Solar Power System Installation Area

    Directory of Open Access Journals (Sweden)

    Selami Kesler

    2015-01-01

    Full Text Available Shading analyzer systems are necessary for selecting the most suitable installation site to sustain enough solar power. Afterwards, changes in solar data throughout the year must be evaluated along with the identification of obstructions surrounding the installation site in order to analyze shading effects on productivity of the solar power system. In this study, the shading analysis tools are introduced briefly, and a new and different device is developed and explained to analyze shading effect of the environmental obstruction on the site on which the solar power system will be established. Thus, exposure duration of the PV panels to the sunlight can be measured effectively. The device is explained with an application on the installation area selected as a pilot site, Denizli, in Turkey.

  20. Design basis of off-site emergency response plans for fuel cycle installations

    International Nuclear Information System (INIS)

    Rzepka, J.P.; Dubiau, Ph.; Jouve, A.C.; Charles, T.; Mercier, J.P.

    1995-01-01

    In France, the term 'off-site emergency response plan' refers to all the arrangements which should be made by the government authorities to protect the population in the event of an accident affecting the installations of the site considered. The outline of the method of defining typical accidents, evaluation of 'source-terms' and health consequences is presented. Two applications to installations from the front-end and from the back-end of the fuel cycle are discussed. (K.A.). 1 tab

  1. Lifetime Evaluation of Grid-Connected PV Inverters Considering Panel Degradation Rates and Installation Sites

    DEFF Research Database (Denmark)

    Sangwongwanich, Ariya; Yang, Yongheng; Sera, Dezso

    2018-01-01

    Lifetime of PV inverters is affected by the installation sites related to different solar irradiance and ambient temperature profiles (also referred to as mission profiles). In fact, the installation site also affects the degradation rate of the PV panels, and thus long-term energy production...... and reliability. Prior-art lifetime analysis in PV inverters has not yet investigated the impact of PV panel degradations. This paper thus evaluates the lifetime of PV inverters considering panel degradation rates and mission profiles. Evaluations have been carried out on PV systems installed in Denmark...... and Arizona. The results reveal that the PV panel degradation rate has a considerable impact on the PV inverter lifetime, especially in the hot climate (e.g., Arizona), where the panel degrades at a faster rate. In that case, the PV inverter lifetime prediction can be deviated by 54%, if the impact of PV...

  2. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  3. Days of dismantling activities of installations and rehabilitation of contaminated sites in France; Demantelement des installations et rehabilitation de sites contamines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    The objective of these days, organized by the section environment of the French society of radiation protection, is to present a panorama of the activities of nuclear installations dismantling and contaminated sites rehabilitation in France, by leaning in the same time on practical cases and by stating the French rule and the national and international recommendations on the subject. These days have also for object to approach the stakes associated with the sectors of waste management and the materials generated by these activities and in a more general way, the stakes to come for the different actors of the dismantling and the rehabilitation. (N.C.)

  4. Bavarian Constitutional Court, decision of August 14, 1987 (Referendum on sites of nuclear installations)

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    In the dissenting opinion of one of the judges of the Bavarian Constitutional Court concerning the decision of August 14, 1987, the Land Bavaria has a competence according to the constitution to decide about sites of nuclear installations. Hence it follows that a referendum on this problem has to be permitted. (CW) [de

  5. 30 CFR 71.500 - Sanitary toilet facilities at surface work sites; installation requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Sanitary toilet facilities at surface work sites; installation requirements. 71.500 Section 71.500 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY HEALTH STANDARDS-SURFACE COAL MINES AND...

  6. The Savannah River Site's Groundwater Monitoring Program 1991 well installation report

    International Nuclear Information System (INIS)

    1992-06-01

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1991. It includes discussion of environmental soil borings, surveying, well installations, abandonments, maintenance, and stabilization

  7. Volcanic Hazard Assessments for Nuclear Installations: Methods and Examples in Site Evaluation

    International Nuclear Information System (INIS)

    2016-07-01

    To provide guidance on the protection of nuclear installations against the effects of volcanoes, the IAEA published in 2012 IAEA Safety Standards Series No. SSG-21, Volcanic Hazards in Site Evaluation for Nuclear Installations. SSG-21 addresses hazards relating to volcanic phenomena, and provides recommendations and general guidance for evaluation of these hazards. Unlike seismic hazard assessments, models for volcanic hazard assessment have not undergone decades of review, evaluation and testing for suitability in evaluating hazards at proposed nuclear installations. Currently in volcanology, scientific developments and detailed methodologies to model volcanic phenomena are evolving rapidly.This publication provides information on detailed methodologies and examples in the application of volcanic hazard assessment to site evaluation for nuclear installations, thereby addressing the recommendations in SSG-21. Although SSG-21 develops a logical framework for conducting a volcanic hazard assessment, this publication demonstrates the practicability of evaluating the recommendations in SSG-21 through a systematic volcanic hazard assessment and examples from Member States. The results of this hazard assessment can be used to derive the appropriate design bases and operational considerations for specific nuclear installations

  8. Preparation of off-site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This document is issued as a lead document to facilitate preparation of specific site manuals by the Responsible Organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publication on the subject: Safety Manual on Off-Site Emergency Plan for Nuclear Installations, AERB/SM/NISD-2, 1988 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come out in a significant manner after the accidents at Chernobyl and Bhopal

  9. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  10. Meeting around industrial sites; Concertation autour des sites d'installations industrielles

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Th. [Centre d' etude sur l' Evaluation de la Protection dans le domaine Nucleaire (CEPN), 92 - Fontenay aux Roses (France); Sene, M. [Groupement de Scientifiques pour l' Information sur l' Energie Nucleaire, 91 - Orsay (France); Melguen, M. [Electricite de France (EDF), 75 - Paris (France); Saint-Raymond, Ph. [Direction Generale de la Surete Nucleaire et de la Radioprotection, 75 - Paris (France); Oudiz, A. [Institut de Radioprotection et de Surete Nucleaire, 92 - Fontenay-aux-Roses (France); Brie, J. [Charente Nature (France); Schmitt, P. [CLS de Fessenheim, 68 (France); Verot, Y [Atofina, 92 -Paris la Defense (France); Quintin, Ch. [DRIRE Rhone Alpes, 69 (France); Dubuis, Th. [Secretariat Permanent pour la Prevention des Pollutions Industrielles, 59 - Dunkerque (France); Adelfa, J.S.; Hocquet, M.P. [CLCV, France (France); Gheerardyn, P. [MEDEF Cote d' Opale (France); Villers, S. [EDA, France (France); Modrzejewski, F. [DRIRE Nord-Pas-de-Calais (France); Gadbois, S.; Heriard-Dubreuil, G. [MUTADIS, 75 - Paris (France); Geismar, N.; Eimer, M. [CLI de Saint-Laurent (France); Andre, S. [CEA Cadarache, 13 - Saint-Paul-lez-Durance (France); Vindimian, E. [Institut National de l' Environnement Industriel et des Risques, 60 - Verneuil en Halatte (INERIS) (France); Remond-Gouilloud, M. [Universite Paris-Sorbonne, 75 (France)

    2005-07-01

    Following the research work on the ' stakes in the social dialogue around the follow-up of the nuclear industrial installations ' engaged by the I.R.S.N. in 2000, a seminar was organized on January 21. and 22., 2003 in Ville d Avray. This seminar gathered personalities of different origins (administration, institutional experts, operators, associations, Local Commissions of Information, elected representatives) to discuss and enrich the conclusions of the research work and elaborate collectively a contribution to the current remarks in France on the public debate and the processes of dialogue. The present report establishes the acts of this seminar and redraws all the discussions between the participants. (N.C.)

  11. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    Energy Technology Data Exchange (ETDEWEB)

    Zaltash, Abdolreza [ORNL

    2007-09-01

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

  12. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  13. Days of dismantling activities of installations and rehabilitation of contaminated sites in France

    International Nuclear Information System (INIS)

    2008-01-01

    The objective of these days, organized by the section environment of the French society of radiation protection, is to present a panorama of the activities of nuclear installations dismantling and contaminated sites rehabilitation in France, by leaning in the same time on practical cases and by stating the French rule and the national and international recommendations on the subject. These days have also for object to approach the stakes associated with the sectors of waste management and the materials generated by these activities and in a more general way, the stakes to come for the different actors of the dismantling and the rehabilitation. (N.C.)

  14. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  15. The Contribution of Palaeoseismology to Seismic Hazard Assessment in Site Evaluation for Nuclear Installations

    International Nuclear Information System (INIS)

    2015-06-01

    IAEA Safety Standards Series No. SSG-9, Seismic Hazards in Site Evaluation for Nuclear Installations, published in 2010, covers all aspects of site evaluation relating to seismic hazards and recommends the use of prehistoric, historical and instrumental earthquake data in seismic hazard assessments. Prehistoric data on earthquakes cover a much longer period than do historical and instrumental data. However, gathering such data is generally difficult in most regions of the world, owing to an absence of human records. Prehistoric data on earthquakes can be obtained through the use of palaeoseismic techniques. This publication describes the current status and practices of palaeoseismology, in order to support Member States in meeting the recommendations of SSG-9 and in establishing the necessary earthquake related database for seismic hazard assessment and reassessment. At a donors’ meeting of the International Seismic Safety Centre Extrabudgetary Project in January 2011, it was suggested to develop detailed guidelines on seismic hazards. Soon after the meeting, the disastrous Great East Japan Earthquake and Tsunami of 11 March 2011 and the consequent accident at the Fukushima Daiichi nuclear power plant occurred. The importance of palaeoseismology for seismic hazard assessment in site evaluation was highlighted by the lessons learned from the Fukushima Daiichi nuclear power plant accident. However, no methodology for performing investigations using palaeoseismic techniques has so far been available in an IAEA publication. The detailed guidelines and practical tools provided here will be of value to nuclear power plant operating organizations, regulatory bodies, vendors, technical support organizations and researchers in the area of seismic hazard assessment in site evaluation for nuclear installations, and the information will be of importance in support of hazard assessments in the future

  16. Funding Site Cleanup at Closing Army Installations: A Stochastic Optimization Approach

    National Research Council Canada - National Science Library

    Ardic, Sureyya

    2001-01-01

    ...) to help determine how to allocate limited yearly funding to installations for environmental cleanup, Considering environmental policies and yearly installation funding requests from 2002 to 2015...

  17. Preparation, installation, and calibration of a 152-fiber imaging experiment at the Nevada Test Site

    International Nuclear Information System (INIS)

    Thayer, D.R.; Lyons, P.B.; Looney, L.D.; Manning, J.P.; Malone, R.M.

    1981-01-01

    Fiber-optic transmission lines are being used with increasing frequency in the demanding environment of nuclear device diagnostic tests at the Nevada Test Site. Previous reports have described diagnostic experiments that utilize properties of fiber-optic cables to provide capabilities that are extremely difficult to obtain with coaxial cable systems. This paper describes an imaging experiment conducted during the last quarter of 1980 at the Nevada Test Site involving 152 approx. 0.6-km long GI fibers in 18 cables. An imager cell sensitive to neutron and gamma radiation was located at approx. 8 m from the source. Individual elements of the fluor were coupled by approx. 10 m PCS fibers (for radiation damage resistance) to the GI fibers used for the uphole and surface lines to the detector station. Light from the imager cell in a 9-nm band, centered at 540 nm, was detected by photomultipliers and the electrical signals then recorded on oscilloscopes. Overall system bandwidth, including the fluor, was approx. 80 MHz. Due to the complexity of the experiment and the conditions associated with field testing, the PCS and GI fibers were cut and terminated under laboratory shop conditions prior to installation at the field site. Procedures used for quality assurance of the fiber assemblies as well as procedures used in checking fiber throughput during installation are described. The application of a large star coupler (5 input x 200 output fibers) used for system time and amplitude calibration and an attempt to shutter fibers with neutrons for a multiplexing application are also discussed

  18. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase

  19. Location Capability and Site Characterization Installing a Borehole VBB Seismometer: the OGS Experience in Ferrara (Italy)

    Science.gov (United States)

    Pesaresi, D.; Barnaba, C.

    2014-12-01

    The Centro di Ricerche Sismologiche (CRS, Seismological Research Centre) of the Istituto Nazionale di Oceanografia e di Geofisica Sperimentale (OGS, Italian National Institute for Oceanography and Experimental Geophysics) in Udine (Italy) after the strong earthquake of magnitude M=6.4 occurred in 1976 in the Italian Friuli-Venezia Giulia region, started to operate the Northeastern Italy Seismic Network: it currently consists of 19 very sensitive broad band and 17 simpler short period seismic stations, all telemetered to and acquired in real time at the OGS CRS data centre in Udine. The southwestern edge of the OGS seismic network stands on the Po alluvial basin: earthquake localization and characterization in this area is affected by the presence of soft alluvial deposits. Following the ML=5.9 earthquake that struck the Emilia region around Ferrara in Northern Italy on May 20, 2012, a cooperation of Istituto Nazionale di Geofisica e Vulcanologia, OGS, the Comune di Ferrara and the University of Ferrara lead to the reinstallation of a previously existing very broad band (VBB) borehole seismic station in Ferrara and to the deployment of a temporary seismographic network consisting of eight portable seismological stations, to record the local earthquakes that occurred during the seismic sequence. The aim of the OGS intervention was on one hand to extend its real time seismic monitoring capabilities toward South-West, including Ferrara and its surroundings, and on the other hand to evaluate seismic site responses in the area. We will introduce details of the Ferrara VBB borehole station and the OGS temporary seismographic network configuration and installation. We will then illustrate the location capability performances, and finally we will shortly describe seismic site characterization with surface/borehole comparisons in terms of seismic noise, site amplification and resonance frequencies.

  20. Status of environmental response efforts at radioactively contaminated sites in the united states air force installation restoration program

    International Nuclear Information System (INIS)

    Rowe, W.D. Jr.; McEntee, T.E. Jr.; Johnson, B.; Manning, L.

    1995-01-01

    The United States Air Force has identified approximately 170 radioactively contaminated sites at its domestic installations. These sites contain a variety of low level radioactive and mixed wastes and are classified as burial sites, landfills, buildings, and other disposal sites. Of these 170, approximately 70 are presently being evaluated under the Air Force Installation Restoration Program (IRP) in accordance with applicable laws and regulations. Removal and/or remedial actions have been taken at specific sites using site-specific residual radioactivity criteria. The remaining sites are either under investigation to determine the need for possible action or have been classified as response complete based on restricted or unrestricted future use. This paper describes past Air Force operations that generated radioactive waste materials; examines the current inventory of resulting radioactively contaminated sites in the Air Force IRP; reviews criteria used to evaluate sites for removal and/or remedial actions; provides summary information on actions taken at sites; and focuses on response actions and cleanup levels at two completed sites. The paper concludes with an assessment of outstanding issues relevant to the remediation of radioactively contaminated sites. (author)

  1. Carbon storage as affected by different site preparation techniques two years after mixed forest stand installation

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, F.; Figueiredo, T. de; Martins, A.

    2014-06-01

    Aim of study: This study aims at evaluating the impact of site preparation techniques prior to plantation on carbon storage and distribution in a young mixed stand of Pseudotsuga menziesii (PM) and Castanea sativa (CS). Area of study: The experimental field was established near Macedo de Cavaleiros, Northern Portugal, at 700 m elevation, mean annual temperature 12 degree centigrade and mean annual rainfall 678 mm. Material and methods: The experimental layout includes three replicates, where the different treatments corresponding to different tillage intensities were randomly distributed (high, moderate and slight intensity), in plots with an area of 375 m{sup 2} each. Twenty six months after forest stand installation, samples of herbaceous vegetation (0.49 m{sup 2} quadrat), forest species (8 PM and 8 CS) and mineral soil (at 0-5, 5-15, 15-30 and 30-60 cm depth) were collected in 15 randomly selected points in each treatment, processed in laboratory and analyzed for carbon by elemental carbon analyzer. Main results: The results obtained showed that: (i) more than 90% of the total carbon stored in the system is located in the soil, increasing in depth with tillage intensity; (ii) the contribution of herbaceous vegetation and related roots to the carbon storage is very low; (iii) the amount of carbon per tree is higher in CS than in PM; (iv) the global carbon storage was affected by soil tillage generally decreasing with the increase of tillage intensity. Accordingly, carbon storage capacity as affected by the application of different site preparation techniques should be a decision support tool in afforestation schemes. (Author)

  2. Tidal Energy Conversion Installation at an Estuarine Bridge Site: Resource Evaluation and Energy Production Estimate

    Science.gov (United States)

    Wosnik, M.; Gagnon, I.; Baldwin, K.; Bell, E.

    2015-12-01

    The "Living Bridge" project aims to create a self-diagnosing, self-reporting "smart bridge" powered by a local renewable energy source, tidal energy - transforming Memorial Bridge, a vertical lift bridge over the tidal Piscataqua River connecting Portsmouth, NH and Kittery, ME, into a living laboratory for researchers, engineers, scientists, and the community. The Living Bridge project includes the installation of a tidal turbine at the Memorial Bridge. The energy converted by the turbine will power structural health monitoring, environmental and underwater instrumentation. Utilizing locally available tidal energy can make bridge operation more sustainable, can "harden" transportation infrastructure against prolonged grid outages and can demonstrate a prototype of an "estuarine bridge of the future". A spatio-temporal tidal energy resource assessment was performed using long term bottom-deployed Acoustic Doppler Current Profilers (ADCP) at two locations: near the planned deployment location in 2013-14 for 123 days and mid-channel in 2007 for 35 days. Data were evaluated to determine the amount of available kinetic energy that can be converted into usable electrical energy on the bridge. Changes in available kinetic energy with ebb/flood and spring/neap tidal cycles and electrical energy demand were analyzed. The target deployment site exhibited significantly more energetic ebb tides than flood tides, which can be explained by the local bathymetry of the tidal estuary. A system model is used to calculate the net energy savings using various tidal generator and battery bank configurations. Different resource evaluation methodologies were also analyzed, e.g., using a representative ADCP "bin" vs. a more refined, turbine-geometry-specific methodology, and using static bin height vs. bin height that move w.r.t. the free surface throughout a tidal cycle (representative of a bottom-fixed or floating turbine deployment, respectively). ADCP operating frequencies and bin

  3. 78 FR 72794 - Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations

    Science.gov (United States)

    2013-12-04

    ... company's reliance on section 2.55(a) to install an air stabilization unit was unwarranted because the... coolers, a transformer, field inlet separation facilities, and pigging equipment). [[Page 72796

  4. Dismantling of alpha contaminated obsolete installations and glove boxes on the IRMM site in Geel (Belgium)

    International Nuclear Information System (INIS)

    Cretskens, Pieter; Lenie, Koen; Melis, Gustaaf

    2007-01-01

    At the Institute for Reference Materials and Measurements (European commission, Joint Research Centre, IRMM) a dismantling campaign of obsolete installations and glove boxes has been carried out in 2005. There were various reasons for their removal. Some large installations did not meet modern safety standards, other installations were worn out and expected to cause a radioactive contamination risk in the future. The main goal was to create as less waste as possible by extensive contamination checks and by decontamination if necessary. For the glove boxes, decontamination was not possible. A controlled area was set up around the installation to be dismantled in order to prevent spreading of contamination from dust and dirt. This was only possible for the 'minor' contaminated installations. The dismantling campaign of the glove boxes was carried out by using tents of two types depending the contamination inside the glove boxes. The most common glove boxes were dismantled in a tent constructed with hard surfaced polycarbonate plates (ventilated cell). For glove boxes with higher contamination, the same principle was used but with a second 'glove box tent' inside (ventilated glove tent). The purpose of this project was to learn from the experience of this campaign which gave the ability to make estimates of future radioactive waste or classic waste that could be expected from dismantled installations. (authors)

  5. The 1996-2009 borehole dilatometer installations, operation, and maintenance at sites in Long Valley Caldera, CA

    Science.gov (United States)

    Myren, Glenn; Johnston, Malcolm; Mueller, Robert

    2011-01-01

    High seismicity levels with accelerating uplift (under the resurgent dome) in Long Valley caldera in the eastern Sierra Nevada from 1989 to 1997, triggered upgrades to dilational strainmeters and other instrumentation installed in the early 1980's following a series of magnitude 6 earthquakes. This included two additional high-resolution borehole strainmeters and replacement of the failed strainmeter at Devil's Postpile. The purpose of the borehole-monitoring network is to monitor crustal deformation and other geophysical parameters associated with volcanic intrusions and earthquakes in the Long Valley Caldera. Additional instrumentation was added at these sites to improve the capability of providing continuous monitoring of the magma source under the resurgent dome. Sites were selected in regions of hard crystalline rock, where the expected signals from magmatic activity were calculated to be a maximum and the probability of an earthquake of magnitude 4 or greater is large. For the most part, the dilatometers were installed near existing arrays of surface tiltmeters, seismometers, level line, and GPS arrays. At each site, attempts are made to separate tectonic and volcanic signals from known noise sources in each instrument type. Each of these sites was planned to be a multi-parameter monitoring site, which included measurements of 3-component seismic velocity and acceleration, borehole strain, tilt, pore pressure and magnetic field. Using seismicity, geophysical knowledge, geologic and topographic maps, and geologists recommendations, lists of preliminary sites were chosen. Additional requirements were access, and telemetry constraints. When the final site choice was made, a permit was obtained from the U.S. Forest Service. Following this selection process, two new borehole sites were installed on the north and south side of the Long Valley Caldera in June of 1999. One site was located near Big Spring Campground to the east of Crestview. The second site was

  6. Characterization of Site for Installing Open Loop Ground Source Heat Pump System

    Science.gov (United States)

    Yun, S. W.; Park, Y.; Lee, J. Y.; Yi, M. J.; Cha, J. H.

    2014-12-01

    This study was conducted to understand hydrogeological properties of site where open loop ground source heat pump system will be installed and operated. Groundwater level and water temperature were hourly measured at the well developed for usage of open loop ground source heat pump system from 11 October 2013 to 8 January 2014. Groundwater was sampled in January and August 2013 and its chemical and isotopic compositions were analyzed. The bedrock of study area is the Jurassic granodiorite that mainly consists of quartz (27.9 to 46.8%), plagioclase (26.0 to 45.5%), and alkali feldspar (9.5 to 18.7%). The groundwater level ranged from 68.30 to 68.94 m (above mean sea level). Recharge rate was estimated using modified watertable fluctuation method and the recharge ratios was 9.1%. The water temperature ranged from 14.8 to 15.0oC. The vertical Increase rates of water temperature were 1.91 to 1.94/100 m. The water temperature showed the significant seasonal variation above 50 m depth, but had constant value below 50 m depth. Therefore, heat energy of the groundwater can be used securely in open loop ground source heat pump system. Electrical conductivity ranged from 120 to 320 µS/cm in dry season and from 133 to 310 µS/cm in wet season. The electrical conductivity gradually decreased with depth. In particular, electrical conductivity in approximately 30 m depth decreased dramatically (287 to 249 µS/cm) in wet season. The groundwater was Ca-HCO3 type. The concentrations of dissolved components did not show the vertically significant variations from 0 to 250 m depth. The δ18O and δD ranged from -9.5 to -9.4‰ and from -69 to -68‰. This work is supported by the New and Renewable Energy of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) grant funded by the Korea government Ministry of Knowledge Economy (No.20123040110010).

  7. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  8. Work plan for ground water elevation data recorder/monitor well installation at the New Rifle Site, Rifle, Colorado

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the New Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project site, Rifle, Colorado. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River

  9. Design and installation of deep multilevel piezometer nests in Columbia River basalts at the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Jackson, R.L.; Veatch, M.D.

    1985-04-01

    The Basalt Waste Isolation Project (BWIP) was established in 1976 as part of the National Waste Terminal Storage Program, now the Office of Civilian Radioactive Waste Management. The BWIP objective is to assess the suitability of basalt as a repository medium for the long-term storage of commercial high-level radioactive waste. As part of the hydrogeologic characterization activities, BWIP designed and installed multilevel piezometer nests at three borehole cluster sites within and adjacent to the 18-square-mile reference repository location. These borehole cluster sites will provide multilevel piezometric baseline data across the reference repository location prior to, during, and after drilling a large-diameter exploratory shaft. They will also be used to monitor future hydraulic stress tests on a large scale. Three series of piezometer nests (A-, C-, and D-series) were installed at three borehole cluster sites in nine hydrogeologic units from a depth of about 500 to 3700 feet within the Columbia River Basalt Group. These multilevel monitoring zones are isolated from each other and the next overlying hydrogeologic unit by high-density cement seals. The A-series piezometer nests monitor two shallow sedimentary units. The C-series piezometer nests monitor basalt flow tops in the six deepest zones. The D-series piezometer monitors an intermediate sedimentary unit. Each piezometer tube was developed by air-lift pumping to complete the installtion prior to installing downhole pressure transducers. 23 refs., 10 figs., 1 tab

  10. 78 FR 679 - Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance...

    Science.gov (United States)

    2013-01-04

    ... process, see the Comment Procedures Section of this document. FOR FURTHER INFORMATION CONTACT: Katherine... existing facilities.\\14\\ The Commission reasoned that section 2.55(b) replacements ``should only involve... when an installation can qualify for section 157.203(b) automatic authorization). Further, to alleviate...

  11. Using GIS data and satellite derived irradiance to optimize siting of PV installations in Switzerland

    Science.gov (United States)

    Kahl, Annelen; Nguyen, Viet-Anh; Bartlett, Stuart; Sossan, Fabrizio; Lehning, Michael

    2016-04-01

    For a successful distribution strategy of PV installations, it does not suffice to choose the locations with highest annual total irradiance. Attention needs to be given to spatial correlation patterns of insolation to avoid large system-wide variations, which can cause extended deficits in supply or might even damage the electrical network. One alternative goal instead is to seek configurations that provide the smoothest energy production, with the most reliable and predictable supply. Our work investigates several scenarios, each pursuing a different strategy for a future renewable Switzerland without nuclear power. Based on an estimate for necessary installed capacity for solar power [Bartlett, 2015] we first use heuristics to pre-select realistic placements for PV installations. Then we apply optimization methods to find a subset of locations that provides the best possible combined electricity production. For the first part of the selection process, we use a DEM to exclude high elevation zones which would be difficult to access and which are prone to natural hazards. Then we use land surface cover information to find all zones with potential roof area, deemed suitable for installation of solar panels. The optimization employs Principal Component Analysis of satellite derived irradiance data (Surface Incoming Shortwave Radiation (SIS), based on Meteosat Second Generation sensors) to incorporate a spatial aspect into the selection process that does not simply maximize annual total production but rather provides the most robust supply, by combining regions with anti-correlated cloud cover patterns. Depending on the initial assumptions and constraints, the resulting distribution schemes for PV installations vary with respect to required surface area, annual total and lowest short-term production, and illustrate how important it is to clearly define priorities and policies for a future renewable Switzerland.

  12. Lessons learned from an installation perspective for chemical demilitarization plant start-up at four operating incineration sites.

    Energy Technology Data Exchange (ETDEWEB)

    Motz, L.; Decision and Information Sciences

    2011-02-21

    This study presents the lessons learned by chemical storage installations as they prepared for the start of chemical demilitarization plant operations at the four current chemical incinerator sites in Alabama, Arkansas, Oregon, and Utah. The study included interviews with persons associated with the process and collection of available documents prepared at each site. The goal was to provide useful information for the chemical weapons storage sites in Colorado and Kentucky that will be going through plant start-up in the next few years. The study is not a compendium of what to do and what not to do. The information has been categorized into ten lessons learned; each is discussed individually. Documents that may be useful to the Colorado and Kentucky sites are included in the appendices. This study should be used as a basis for planning and training.

  13. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    International Nuclear Information System (INIS)

    Nielsen, T K; Kjeldsen, M

    2010-01-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  14. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    Science.gov (United States)

    Nielsen, T. K.; Kjeldsen, M.

    2010-08-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  15. Aerosol measurements at the Southern Great Plains Site: Design and surface installation

    Energy Technology Data Exchange (ETDEWEB)

    Leifer, R.; Knuth, R.H.; Guggenheim, S.F.; Albert, B. [Department of Energy, New York, NY (United States)

    1996-04-01

    To impropve the predictive capabilities of the Atmospheric Radiation Measurements (ARM) program radiation models, measurements of awserosol size distributions, condensation particle concentrations, aerosol scattering coefficients at a number of wavelenghts, and the aerosol absorption coefficients are needed at the Southern Great Plains (SGP) site. Alos, continuous measurements of ozone concnetrations are needed for model validation. The environmental Measuremenr Laboratory (EMK) has the responsibility to establish the surface aerosol measurements program at the SGP site. EML has designed a special sampling manifold.

  16. Installation Restoration Program. Ohio Air National Guard, Toledo Express Airport, Swanton, Ohio. Site Investigation Work Plan

    Science.gov (United States)

    1990-09-01

    Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using

  17. CNN's evaluation of the radiological monitoring special programs at the sites of nuclear installations

    International Nuclear Information System (INIS)

    Lareyne, O.; Marugan Tovar, I.; Martinez Moreno, M.; Sanz Alduan, M. T.

    2011-01-01

    In 2008, occurred in the Spanish plants various events related to the existence on the sites of the Spanish nuclear facilities or areas dotted with radioactive contamination outside the buildings, events that were reported to the Nuclear Safety Council (CSN) in accordance with the provisions of the regulation, as a result of the analysis of those events, the CSN issued in July 2008, a complementary technique INSTRUCTIONAL requiring the implementation of environmental monitoring programs in outdoor areas within sites nuclear tacilities. First, the CSN nuclear facilities referred to the programs and methodologies intended to perform such monitoring, and, in late 2009, reports of program results.

  18. Site-specific issues related to structural/seismic design of an underground independent spent fuel storage installation (ISFSI)

    International Nuclear Information System (INIS)

    Tripathi, B.P.

    2005-01-01

    Utilities owning and operating commercial nuclear power plants (NPP) in USA may choose to build an underground Independent Spent Fuel Storage Installation (ISFSI) to store the spent nuclear fuels. The regulatory requirements and other guidance are based on 10 CFR Part 72, Regulatory Guide RG 3.73, Standard Review Plans NUREG-1536 and NUREG-1567, and Interim staff Guidance (ISG) documents as applicable. Structures, Systems, and Components (SSCs) classified as important to safety are designed to withstand the effects of site-specific environmental conditions and natural phenomena such as earthquake, tornado, flood, etc. An underground ISFSI for storage of spent nuclear fuel, presents some unique analysis and design challenges. This paper will briefly address some of these challenges and discuss site-specific loads, including seismic for the ISFSI design. (authors)

  19. Installing the earth station of Ka-band satellite frequency in Malaysia: conceptual framework for site decision

    Science.gov (United States)

    Mahmud, M. R.; Reba, M. N. M.; Jaw, S. W.; Arsyad, A.; Ibrahim, M. A. M.

    2017-05-01

    This paper developed a conceptual framework in determining the suitable location in installing the earth station for Ka-band satellite communication in Malaysia. This current evolution of high throughput satellites experienced major challenge due to Malaysian climate. Because Ka-band frequency is highly attenuated by the rainfall; it is an enormous challenge to define the most appropriate site for the static communication. Site diversity, a measure to anticipate this conflict by choosing less attenuated region and geographically change the transmission strategy on season basis require accurate spatio-temporal information on the geographical, environmental and hydro-climatology at local scale. Prior to that request, this study developed a conceptual framework to cater the needs. By using the digital spatial data, acquired from site measurement and remote sensing, the proposed framework applied a multiple criteria analysis to perform the tasks of site selection. With the advancement of high resolution remotely sensed data, site determination can be conducted as in Malaysia; accommodating a new, fast, and effective satellite communication. The output of this study is one of the pioneer contributions to create a high tech-society.

  20. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Kirtland AFB, New Mexico

    Science.gov (United States)

    1981-11-01

    hikers, skiers and snowmobilers. 1960TH COMMUNICATIONS SQUADRON Mission: Provides operation and maintenance of common-user communications facilities for...public and private records, interviews with knowledgeable parties and site visits. G- 1 -- 1 a)0 o4 i.) U ~ -0 w0.u 4-I (0 00) 0 4J -4 ).$4d 4.) 4-4 0 04

  1. From nuclear installation to greenfield site. SCK-CEN develops a new measurement method

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses a new measurement method that has been developed by the Belgian Nuclear Research Center SCK-CEN in conjunction with the decommissioning of nuclear facilities. This measurement technique is based on on-site gamma ray spectrometry in combination with modelling and is employed for directing the flow of demolition materials in the decommissioning of nuclear facilities.

  2. On-site installation and shielding of a mobile electron accelerator for radiation processing

    International Nuclear Information System (INIS)

    Catana, D.; Panaitescu, J.; Axinescu, S.; Manolache, D.; Matei, C.; Corcodel, C.; Ulmeanu, M..; Bestea, V.

    1995-01-01

    The development of radiation processing of some bulk products, e.g. grains or potatoes, would be sustained if the irradiation had been carried out at the place of storage, i.e. silo. A promising solution is proposed consisting of a mobile electron accelerator, installed on a couple of trucks and traveling from one customer to another. The energy of the accelerated electrons was chosen at 5 MeV, with 10 to 50 kW beam power. The irradiation is possible either with electrons or with bremsstrahlung. A major problem of the above solution is the provision of adequate shielding at the customer, with a minimum investment cost. Plans for a bunker are presented, which houses the truck carrying the radiation head. The beam is vertical downwards, through the truck floor, through a transport pipe and a scanning horn. The irradiation takes place in a pit, where the products are transported through a belt. The belt path is so chosen as to minimize openings in the shielding. Shielding calculations are presented supposing a working regime with 5 MeV bremsstrahlung. Leakage and scattered radiation are taken into account. (orig.)

  3. On-site installation and shielding of a mobile electron accelerator for radiation processing

    Energy Technology Data Exchange (ETDEWEB)

    Catana, D. [Institutul de Fizica Atomica, Bucharest (Romania); Panaitescu, J. [Institutul de Fizica Atomica, Bucharest (Romania); Axinescu, S. [Institutul de Fizica Atomica, Bucharest (Romania); Manolache, D. [Institutul de Fizica Atomica, Bucharest (Romania); Matei, C. [Institutul de Fizica Atomica, Bucharest (Romania); Corcodel, C. [Institutul de Fizica Atomica, Bucharest (Romania); Ulmeanu, M.. [Institutul de Fizica Atomica, Bucharest (Romania); Bestea, V. [Institutul de Fizica Atomica, Bucharest (Romania)

    1995-05-01

    The development of radiation processing of some bulk products, e.g. grains or potatoes, would be sustained if the irradiation had been carried out at the place of storage, i.e. silo. A promising solution is proposed consisting of a mobile electron accelerator, installed on a couple of trucks and traveling from one customer to another. The energy of the accelerated electrons was chosen at 5 MeV, with 10 to 50 kW beam power. The irradiation is possible either with electrons or with bremsstrahlung. A major problem of the above solution is the provision of adequate shielding at the customer, with a minimum investment cost. Plans for a bunker are presented, which houses the truck carrying the radiation head. The beam is vertical downwards, through the truck floor, through a transport pipe and a scanning horn. The irradiation takes place in a pit, where the products are transported through a belt. The belt path is so chosen as to minimize openings in the shielding. Shielding calculations are presented supposing a working regime with 5 MeV bremsstrahlung. Leakage and scattered radiation are taken into account. (orig.).

  4. The Field Lysimeter Test Facility (FLTF) at the Hanford Site: Installation and initial tests

    International Nuclear Information System (INIS)

    Gee, G.W.; Kirkham, R.R.; Downs, J.L.; Campbell, M.D.

    1989-02-01

    The objectives of this program are to test barrier design concepts and to demonstrate a barrier design that meets established performance criteria for use in isolating wastes disposed of near-surface at the Hanford Site. Specifically, the program is designed to assess how well the barriers perform in controlling biointrusion, water infiltration, and erosion, as well as evaluating interactions between environmental variables and design factors of the barriers. To assess barrier performance and design with respect to infiltration control, field lysimeters and small- and large-scale field plots are planned to test the performance of specific barrier designs under actual and modified (enhanced precipitation) climatic conditions. The Field Lysimeter Test Facility (FLTF) is located in the 600 Area of the Hanford Site just east of the 200 West Area and adjacent to the Hanford Meteorological Station. The FLTF data will be used to assess the effectiveness of selected protective barrier configurations in controlling water infiltration. The facility consists of 14 drainage lysimeters (2 m dia x 3 m deep) and four precision weighing lysimeters (1.5 m x 1.5 m x 1.7 m deep). The lysimeters are buried at grade and aligned in a parallel configuration, with nine lysimeters on each side of an underground instrument chamber. The lysimeters were filled with materials to simulate a multilayer protective barrier system. Data gathered from the FLTF will be used to compare key barrier components and to calibrate and test models for predicting long-term barrier performance

  5. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Eglin AFB, Florida

    Science.gov (United States)

    1981-10-01

    Okaloosa Co. 3-12 Crestview South Quadrangle, Florida-Okaloosa Co. -13 Mossy ead Quadrangle, Florida-Walton Co 3-14 E-1 EGUN AFB 4,h aa V, WRAMATIO...I) Um AYPM hIN1DS SP * So". AM T 0 Tou A is a O I. h E-2 ES ENGINEERING -SCIENCE V%777-7NN7 .7-7 EGUN AFB 0.4 .m ... (1) WMg LAN DOSAMU *Y* CO u...r Oumm *p S(S Ann~ Il~~O 0*aAMa 2-3 ES ENGINEER ING - SCIENCE EGUN AFB %Tt MAR ESTHER * : . . - . - ~ - ~ r W R G H T L A N D F I L L 3 SITE 0296

  6. Reasons for mini-implants failure: choosing installation site should be valued!

    Directory of Open Access Journals (Sweden)

    Alberto Consolaro

    2014-04-01

    Full Text Available Mini-implant loss is often associated with physical and mechanical aspects that result from choosing an inappropriate placement site. It is worth highlighting that: a Interdental alveolar bone crests are flexible and deformable. For this reason, they may not offer the ideal absolute anchorage. The more cervical the structures, the more delicate they are, thus offering less physical support for mini-implant placement; b Alveolar bone crests of triangular shape are more deformable, whereas those of rectangular shape are more flexible; c The bases of the alveolar processes of the maxilla and the mandible are not flexible, for this reason, they are more likely to receive mini-implants; d The more cervical a mini-implant is placed, the higher the risk of loss; the more apical a mini-implant is placed, the better its prognosis will be; e 3D evaluations play a major role in planning the use of mini-implants. Based on the aforementioned considerations, the hypotheses about mini-implant loss are as follows: 1 Deflection of maxillary and mandibular alveolar processes when mini-implants are more cervically placed; 2 Mini-implants placed too near the periodontal ligament, with normal intra-alveolar tooth movement; 3 Low bone density, low thickness and low alveolar bone volume; 4 Low alveolar cortical bone thickness; 5 Excessive pressure inducing trabecular bone microfracture; 6 Sites of higher anatomical weakness in the mandible and the maxilla; 7 Thicker gingival tissue not considered when choosing the mini-implant.

  7. An analysis of inhabitants opinion on energy issues. Comparison between localities of nuclear installation sites and of urban communities

    International Nuclear Information System (INIS)

    Takahashi, Reiko; Nakagome, Yoshihiro

    2004-01-01

    For the purpose of comparing the mental attitudes toward nuclear power generation held by the public between localities containing nuclear installation sites and those of urban communities, a survey has been conducted by mail and by direct interviews. The survey conversed Fukushima, Niigata and Fukui Prefectures, representing the former group of localities, whereas Tokyo and Osaka, representing the latter. The mail survey revealed differences between the two groups of localities in their image of power and in their perception of its present status, as well as in their sense of values in daily life. The interview survey indicated that the factors behind the differences included regional characteristics such as temperaments of resident population, and effects on the private life style brought by nuclear installation. Narrowing down this gap of mental attitude between the two groups of localities should call indispensably for better mutual understanding. In bringing this about, consideration should be given to particular local characteristics, including popular mentality and personal view of life, as well as image and knowledge of energy sources held by the individuals. (author)

  8. Decree No 74-945 of 6 November 1974 concerning gaseous radioactive effluent releases from large nuclear installations and nuclear installations located on the same site

    International Nuclear Information System (INIS)

    1974-01-01

    This Decree prescribes the licensing for the release of gaseous wastes from nuclear installations as well as the technical supervision of such operations. It does not apply to the transport of radioactive effluents which is governed by the regulations on the transport of dangerous goods. (NEA) [fr

  9. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  10. Review of design analysis and site installation method of ASME vessel of fuel test loop of Hanaro

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Sung Won; Kim, Jun Yeon

    1997-02-01

    The major goal of this report is to take the advantages under control, and provide basic solutions for field installation. In order to access to technical availability, the scope, limitation, and possibilities of design requirements are carefully considered in this. The chapter 3 deals with seismic stress analysis of vessels, using manufacturers` finite element analysis data. The test of manufactured equipment is scheduled to hold near future. The evaluation criteria and inspection specifications for the quality release are well illustrated in the chapter IV to efficiently check out the items. The full considerations for field installation are also reviewed with that in terms of space limit. Following the inspection and test of manufacturer`s shop, the results will be promptly reported. Based on installation principles and the analysis in the report, updated procedure and methodology for the installation will be applied to the field in more details and better breakdown precision in the coming years. (author). 14 refs., 23 tabs., 26 figs.

  11. Review of design analysis and site installation method of ASME vessel of fuel test loop of Hanaro

    International Nuclear Information System (INIS)

    Cho, Sung Won; Kim, Jun Yeon.

    1997-02-01

    The major goal of this report is to take the advantages under control, and provide basic solutions for field installation. In order to access to technical availability, the scope, limitation, and possibilities of design requirements are carefully considered in this. The chapter 3 deals with seismic stress analysis of vessels, using manufacturers' finite element analysis data. The test of manufactured equipment is scheduled to hold near future. The evaluation criteria and inspection specifications for the quality release are well illustrated in the chapter IV to efficiently check out the items. The full considerations for field installation are also reviewed with that in terms of space limit. Following the inspection and test of manufacturer's shop, the results will be promptly reported. Based on installation principles and the analysis in the report, updated procedure and methodology for the installation will be applied to the field in more details and better breakdown precision in the coming years. (author). 14 refs., 23 tabs., 26 figs

  12. Work plan for monitor well/groundwater elevation data recorder installation at the Cheney Disposal site, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1994-09-01

    In May 1990, during the excavation for the Grand Junction, Colorado, Cheney Reservoir disposal cell (Cheney), a water bearing paleochannel was encountered along the northern boundary of the excavation (designated the Northwest Paleochannel). To ensure the long-term integrity of the disposal embankment, remedial actions were taken including the excavation of the paleochannel and underlying material to bedrock, backfilling of the trapezoidal trench with granular material, and placement of a geotextile liner above the granular material. Compacted clay backfill was placed above the reconstructed paleochannel trench, and the northwest corner was restored to the designated grade. Investigation of other paleochannels determined that ground water flow terminated before it migrated as far west as the disposal cell. Therefore, flow in these paleochannels would have no impact on the disposal cell. Although characterization efforts did not indicate the presence of a ground water-bearing paleochannel south of the disposal cell, the potential could not be ruled out. As a best management practice for long-term monitoring at Cheney, two monitor wells will be installed within the paleochannels. One well will be installed within 50 feet (ft) west of the reconstructed Northwest Paleochannel. The second well will be installed near the southwestern (downgradient) corner of the disposal cell. The purposes of these wells are to characterize ground water flow (if any) within the paleochannels and to monitor the potential for water movement (seepage) into or out of the disposal cell. Initial monitoring of the paleochannels will consist of water level elevation measurement collection and trend analysis to evaluate fluctuations in storage. The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of two ground water monitor wells and two ground water elevation data recorders (data loggers) at Cheney

  13. Installation restoration program site investigation. Gulfport Field Training Site, Mississippi Air National Guard Gulfport-Biloxi Regional Airport Gulfport, Mississippi. Volume 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-01

    Site Investigation Report, Volume: 2. A Site Investigation was performed at 3 sites at the Combat Readiness Training Center, Gulfport-Bolixi. The 3 sites investigated are the: Former Fire Training Area (Site 1), the Former JP-4 Bulk Storage Area, Mill Road (Site 2), and the Motor Pool Above-Ground Diesel Fuel Storage Tank Area (Site 3). The findings of this investigation recommended further investigation at the Fire Training Area and the JP-4 Bulk Storage Tank. At Site 3 the levels of contamination did not represent a risk to human health or the environment; therefore, no further action was recommended. Volume two of this report consisted of the following Appendixes: Site Photographs (A), Well Inventory (B), Boring Logs (C), CSL Technical Memorandum (D), Data Review and Validation (E), GPS Memorandum (F), Level C Analytical Data Summary Tables (G), Slug Test (H), Special-Status Species (I), and Representative Species of Less Mobile Fish and Wildlife (J).

  14. SU-F-T-491: Photon Beam Matching Analysis at Multiple Sites Up to Twelve Years Post Installation

    Energy Technology Data Exchange (ETDEWEB)

    Able, C [Florida Cancer Specialists - New Port Richey, New Port Richey, FL (United States); Zakikhani, R [Florida Cancer Specialists - Largo, Largo, FL (United States); Yan, K [Florida Cancer Specialists- Tampa, Tampa, FL (United States); Sha, D [Florida Cancer Specialist - New Port Richey, New Port Richey, FL (United States); Chopra, A [Florida Cancer Specialist - Brooksville, Spring Hill, FL (United States)

    2016-06-15

    Purpose: To determine if the photon beams associated with several models of accelerators are matched with ‘Golden Beam’ data (VGBD) to assess treatment planning modeling and delivery. Methods: Six accelerators’ photon beams were evaluated to determine if they matched the manufacturer’s (Varian Medical Systems, Inc.) VGBD. Additional direct comparisons of the 6X and 18X beams using the manufacturer’s specification of Basic and Fine beam matching were also performed. The Cseries accelerator models were 21 EX (3), IX (2), and a IX Trilogy, ranging from three to twelve years post installation. Computerized beam scanning was performed (IBA Blue Phantom 2) with 2 CC13 ion chambers in water at 100 cm SSD. Dmax (10 cm2 field size), percentage depth dose (6 cm2, 10 cm2, 20 cm2, and 30 cm2 field sizes) and beam uniformity (10 cm2, 30 cm2 and 40 cm2 field sizes) were evaluated. Results: When comparing the beams with VGBD using the ‘Basic’ matching criteria, all beams were within the specifications ( 1.5mm at dmax, 1% PDD, and 2% Profiles). When considering the “Fine” matching criteria ( 1.5mm at dmax, 0.5% PDD, and 2% Profiles), only three of six 6MV beams and two of six high energy (five 18MV & one 15MV) beams passed. Direct comparisons between accelerators using the Clinac IX (installed 2012) as the reference beam datasets resulted in all 6 MV and 18MV beams meeting both the “Basic” and “Fine” criterion with the exception of two accelerators. Conclusion: Linear accelerators installed up to nine years apart are capable of meeting the manufacturers beam matching criteria for “Basic” matching. Without any adjustments most beams, when evaluated, may meet the “Fine” match criteria. The use of a single dataset (VGBD or designated accelerator reference data) for treatment planning commissioning is acceptable and can provide quality treatment delivery.

  15. Recommendations for the hydrogeologic review and assessment of sites for nuclear power installations within the framework of the radiation protection licensing procedure

    International Nuclear Information System (INIS)

    Adam, C.; Petschel, M.; Koerner, W.

    1985-01-01

    Article 4 of the Nuclear Facility Licensing Ordinance requires the information to be submitted in support of licensing applications for nuclear power installations to include an expertise on the hydrogeologic characteristics of the site environment with main emphasis on the movement of radionuclides through groundwater in the event of accident conditions, and on measures to protect ground and surface waters. Recommendations are given for the conduct of a hydrogeologic review and assessment process and its timing relative to the individual stages in the licensing procedure. (author)

  16. A study on safety concept and criteria of site release of nuclear installation proposed by international organizations and adopted in decommissioning practices

    International Nuclear Information System (INIS)

    Enokido, Yuji; Miyasaka, Yasuhiko; Ishikawa, Hironori

    2008-01-01

    Regulatory systems and safety criteria of site release of nuclear installation proposed by international organizations such as IAEA and applied in decommissioning in domestic and foreign countries have been studied, in order to avail them to deliberate the relevant domestic regulation and guides. In addition, the applicability of the proposal and practices to domestic legislation have been discussed. Regarding the national safety criteria, the annual individual dose constraint is optimized between 10 μSv and 300 μSv after recommendation and/or guides of IAEA etc. Unconditional release should be achieved, but the conditional and/or partial site release are possible under the same safety criteria to make the selection flexible for licensees. (author)

  17. Work and safety managements for on-site installation, commissioning, tests by EU of quench protection circuits for JT-60SA

    International Nuclear Information System (INIS)

    Yamauchi, Kunihito; Okano, Jun; Shimada, Katsuhiro; Ohmori, Yoshikazu; Terakado, Tsunehisa; Matsukawa, Makoto; Koide, Yoshihiko; Kobayashi, Kazuhiro; Ikeda, Yoshitaka; Fukumoto, Masahiro; Kushita, Kouhei N.

    2016-03-01

    The superconducting Satellite Tokamak machine “JT-60SA” under construction in Naka Fusion Institute is an international collaborative project between Japan Atomic Energy Agency (JAEA) as the Implementing Agency (IA) of Japan (JA) and Fusion for Energy (F4E) as the IA of Europe (EU). The contributions for this project are based on the supply of components, and thus European manufacturer shall conduct the installation, commissioning and tests on Naka site under the general supervision by F4E via the designated institute in each EU nation. This means that JAEA had an issue to manage the works by European workers and their safety although there is no direct contract. This report describes the approaches for the work and safety managements, which were agreed with EU after the negotiation, and the completed on-site works for Quench Protection Circuits (QPC) as the first experience for EU in JT-60SA project. (author)

  18. Investigation of ground-water contamination at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    Science.gov (United States)

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.

  19. FY94 site characterization and multilevel well installation at a west Bear Creek Valley research site on the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Moline, G.R.; Schreiber, M.E.

    1996-03-01

    The goals of this project are to collect data that will assist in determining what constitutes a representative groundwater sample in fractured shale typical of much of the geology underlying the ORR waste disposal sites, and to determine how monitoring-well construction and sampling methods impact the representativeness of the sample. This report details the FY94 field activities at a research site in west Bear Creek Valley on the Oak Ridge Reservation (ORR). These activities funded by the Energy Systems Groundwater Program Office through the Oak Ridge Reservation Hydrologic and Geologic Studies (ORRHAGS) task, focus on developing appropriate sampling protocols for the type of fractured media that underlies many of the ORR waste disposal sites. Currently accepted protocols were developed for porous media and are likely to result in nonrepresentative samples in fractured systems

  20. Geological Mapping and Identification of Active Fault in Site Candidate of Nuclear Power Plant Installation at Ketapang Area and Its Surroundings, Madura

    International Nuclear Information System (INIS)

    Ngadenin; Lilik-Subiantoro; Kurnia-Setiawan-W; Agus-Sutriyono; P Widito

    2004-01-01

    The result of economical study about demand of electric and water supply in Madura Island in 2015 will increase double for domestic or support industry in Madura Island which have to be solved sooner. One way which is considered to solve the problem is Desalination with nuclear electrical plant. In order to support the installation of nuclear Desalination plant, it is needed site free or far from active fault. Active fault is mainly factor to reject the area on site selection process. Aim of the research is to get geological information and identify of active fault in the site candidate of nuclear Desalination plant at Ketapang area and its surrounding by interpretation of air photos and Landsat imagery, geological and structure geological mapping as well as trenching. The lithology of Ketapang and Sokobana site candidate consists of reef and chalky limestone with form of morphology is undulating hills. Structurally, research areas forms a mono cline with east-westerly trending axis, plunging 10 o to E, the direction of strike is W-E, dip 10 o -30 o to the north. This research concludes that an active fault was not found in the area. (author)

  1. Air quality impact of a pair of 150 MW gas turbines pre-installation study on the Champagne-sur-Oise site

    Energy Technology Data Exchange (ETDEWEB)

    Daganaud, A

    1994-12-31

    In the framework of a project for the installation of two gas turbines at the CHAMPAGNE-SUR-OISE power plant, EDF-CNET (Centre National de l`Equipement Thermique) is required to submit an impact report, which includes the present contribution. The purpose of the study was to perform atmospheric dispersion calculations to assess the sulphur dioxide and nitrogen oxide ground concentration levels liable to be incurred by such installations under specified operating conditions. Using the Gaussian dispersion model MULTIPOL, numerical simulations were performed over a 10-year period, based on the chronological stations. The ``fallout`` calculations were performed with an hourly time step over a 1200 point grid covering a 40 x 40 km zone around the plant. The resulting pollution is expressed for each point in terms of annual mean concentrations and daily and hourly mean concentration distributions. Main results are presented as pollution maps, which can then be easily checked against current regulatory values. Two scenarios were simulated : year-long full power operation, which is a fictitious bounding case scenario, and operation about 12 hours per day on 20 to 25 days per year, during the coldest winter periods, which is the most probable scenario. Pollution liable to result from this type of installation was found to be extremely slight. At the most exposed points of the site, the mean SO{sub 2} and NO{sub 2} concentrations obtained for all operating days were only 3{mu}g/m{sup 3} and hourly peaks amounted at most to a few tens of {mu}g/m{sup 3}. Such values remain well below the stipulated limits for these pollutants and the future guide values determined by the European authorities. Increasing the existing very low background level by this specific amount should consequently raise no problems. (Author). 18 figs., 3 annexes., 12 refs.

  2. Detailed workplan for innovative technology demonstrations to support existing treatment operations at the Installation Logistics Center, DSERTS Site FTLE-33, Fort Lewis, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Liikala, T.L.

    1998-07-01

    This workplan is an assemblage of documents for use by Pacific Northwest National Laboratory (PNNL) to direct and control project activities at Fort Lewis, Washington. Fort Lewis is a FORSCOM installation, whose Logistics Center (DSERTS Site FTLE-33) was placed on the National priorities List (NPL) in December 1989, as a result of trichloroethene (TCE) contamination in groundwater beneath the site. Site background information and brief descriptions of the Fort Lewis project and the main supporting documents, which will be used to direct and control the project activities, are provided. These are followed by a summary of the Work Breakdown Structure (WBS) elements, a general project schedule, a list of major deliverables, and a budget synopsis. Test plans for specific elements (Bench-Scale Testing) will be developed separately as those elements are initiated. If additional activities not specifically addressed in the Project Management Plan (Attachment 1) are added to the work scope, addendums to this workplan will be prepared to cover those activities.

  3. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  4. Conceptual Evaluation for the Installation of Treatment Capability for Mixed Low-Level Waste at the Nevada National Security Site

    International Nuclear Information System (INIS)

    2010-01-01

    National Security Technologies, LLC, initiated an evaluation of treatment technologies that they would manage and operate as part of the mixed low-level waste (MLLW) disposal facilities at the Nevada National Security Site (NNSS). The NNSS Disposal Facility has been receiving radioactive waste from the U.S. Department of Energy (DOE) complex since the 1960s, and since 2005 the NNSS Disposal Facility has been receiving radioactive and MLLW for disposal only. In accordance with the Resource Conservation and Recovery Act (RCRA), all mixed waste must meet land disposal restrictions (LDRs) prior to disposal. Compliance with LDRs is attained through treatment of the waste to mitigate the characteristics of the listed waste hazard. Presently, most generators utilize commercial capacity for waste treatment prior to shipment to the NNSS Disposal Facility. The objectives of this evaluation are to provide a conceptual study of waste treatment needs (i.e., demand), identify potential waste treatment technologies to meet demand, and analyze implementation considerations for initiating MLLW treatment capacity at the NNSS Disposal Facility. A review of DOE complex waste generation forecast data indicates that current and future Departmental demand for mixed waste treatment capacity will remain steady and strong. Analysis and screening of over 30 treatment technologies narrowed the field of treatment technologies to four: (1) Macroencapsulation; (2) Stabilization/microencapsulation; (3) Sort and segregation; and (4) Bench-scale mercury amalgamation. The analysis of treatment technologies also considered existing permits, current the NNSS Disposal Facility infrastructure such as utilities and procedures, and past experiences such as green-light and red-light lessons learned. A schedule duration estimate has been developed for permitting, design, and construction of onsite treatment capability at the NNSS Disposal Facility. Treatment capability can be ready in 20 months.

  5. Conceptual Evaluation for the Installation of Treatment Capability for Mixed Low Level Waste at the Nevada National Security Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2010-11-24

    National Security Technologies, LLC, initiated an evaluation of treatment technologies that they would manage and operate as part of the mixed low-level waste (MLLW) disposal facilities at the Nevada National Security Site (NNSS). The NNSS Disposal Facility has been receiving radioactive waste from the U.S. Department of Energy (DOE) complex since the 1960s, and since 2005 the NNSS Disposal Facility has been receiving radioactive and MLLW for disposal only. In accordance with the Resource Conservation and Recovery Act (RCRA), all mixed waste must meet land disposal restrictions (LDRs) prior to disposal. Compliance with LDRs is attained through treatment of the waste to mitigate the characteristics of the listed waste hazard. Presently, most generators utilize commercial capacity for waste treatment prior to shipment to the NNSS Disposal Facility. The objectives of this evaluation are to provide a conceptual study of waste treatment needs (i.e., demand), identify potential waste treatment technologies to meet demand, and analyze implementation considerations for initiating MLLW treatment capacity at the NNSS Disposal Facility. A review of DOE complex waste generation forecast data indicates that current and future Departmental demand for mixed waste treatment capacity will remain steady and strong. Analysis and screening of over 30 treatment technologies narrowed the field of treatment technologies to four: • Macroencapsulation • Stabilization/microencapsulation • Sort and segregation • Bench-scale mercury amalgamation The analysis of treatment technologies also considered existing permits, current the NNSS Disposal Facility infrastructure such as utilities and procedures, and past experiences such as green-light and red-light lessons learned. A schedule duration estimate has been developed for permitting, design, and construction of onsite treatment capability at the NNSS Disposal Facility. Treatment capability can be ready in 20 months.

  6. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  7. Complementary safety assessment assessment of nuclear facilities - Tricastin facility - AREVA; Evaluation complementaire de la surete des installations nucleaires de base - Site du Tricastin - AREVA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This complementary safety assessment analyses the robustness of the Areva part of the Tricastin nuclear site to extreme situations such as those that led to the Fukushima accident. This study includes the following facilities: Areva NC Pierrelatte, EURODIF production, Comurhex Pierrelatte, Georges Besse II plant and Socatri. Robustness is the ability for the plant to withstand events beyond which the plant was designed. Robustness is linked to safety margins but also to the situations leading to a sudden deterioration of the accidental sequence. Moreover, safety is not only a matter of design or engineered systems but also a matter of organizing: task organization (including subcontracting) as well as the setting of emergency plans or the inventory of nuclear materials are taken into consideration in this assessment. This report is divided into 10 main chapters: 1) the feedback experience of the Fukushima accident; 2) description of the site and its surroundings; 3) featuring of the site's activities and installations; 4) accidental sequences; 5) protection from earthquakes; 6) protection from floods; 7) protection from other extreme natural disasters; 8) the loss of electrical power and of the heat sink; 9) the management of severe accidents; and 10) subcontracting policy. This analysis has identified 5 main measures to be taken to limit the risks linked to natural disasters: -) continuing the program for replacing the current conversion plant and the enrichment plant; -) renewing the storage of hydrofluoric acid at the de-fluorination workshop; -) assessing the seismic behaviour of some parts of the de-fluorination workshop and of the fluorine fabrication workshop; -) improving the availability of warning and information means in case of emergency; and -) improving the means to mitigate accidental gaseous releases. (A.C.)

  8. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  9. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  10. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  11. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  12. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  13. Opinion on the radio-ecological monitoring of waters around nuclear installations and on the management of old nuclear waste warehousing sites: 18 recommendations to improve information, transparency and dialogue with involved parties

    International Nuclear Information System (INIS)

    2008-01-01

    After a presentation of the different actors (agencies, institutions, companies) involved in the activities of the various French nuclear installations (base nuclear installations and those concerning the national defence), this report describes the radio-ecological monitoring performed around these nuclear sites: water surveillance on these sites and within their environment, regulatory requirements on effluents and surveillance, information provided by operators and by institutional organisations, assessment of the radio-ecological status of nuclear sites and of potential environmental and health impacts. It describes regulatory obligation in terms of public information, information and communication actions, and gives an assessment of the High committee about public information quality. It discusses ways to improve this quality for a higher transparency, to reinforce the role of local information commissions (CLI), and improve site monitoring. All these aspects are grouped in 18 recommendations

  14. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  15. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  16. Radioactive waste warehousing site installation - INB 56, Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the installation located in Cadarache and used for radioactive waste warehousing (description, radioactive and chemical materials, specific risks, present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, margin assessment), external flooding (installation sizing, margin assessment in relationship with the different flooding origins), other extreme natural events (hail, extreme rainfalls, strong winds, lightning, and earthquake exceeding the design level), loss of electric supplies. The next parts address severe accident management (means and organization for crisis management, robustness of available means), and subcontracting conditions and practices

  17. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2015-09-01

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  18. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  19. Code verification and Y2K testing, calibration, testing, and installation of the radionuclide assay system-photon (RAS-P) at multiple sites for the Savannah River Site

    International Nuclear Information System (INIS)

    Hodge, C.A.

    2000-01-01

    The Radionuclide Assay System - Photon (RAS-P) is a near-field, transmission-corrected assay system developed for measurement of the actinide content of relatively homogeneous waste generated by facility operations. It is intended for use by facility operations personnel, and has features to enhance its usefulness and efficiency. These include multinuclide assay capability, automatic (off-shift) collection of background and straight-through transmission source data, enforcement of measurement control requirements, Go-NoGo or Assay modes, password protection, and reporting of total fissile gram equivalent values. System hardware consists of a shielded high-resolution germanium detector, a turntable, a shielded transmission source and shutter assembly, and a desktop computer and laser printer mounted on a compact frame. RAS-P was designed to assay the contents of cylindrical containers up to 30 inches diameter by 32 inches high, boxes up to 30 inches diagonal by 32 inches high, and HE PA filters up to 2 x 2 x 1 feet. Prior to installation at the Savannah River Site (SRS), code validation, system performance, and assurance against Y2K effects all were confirmed. Code validation was accomplished using spreadsheet calculations that were independent of the original code to calculate intermediate and final result produced by RAS-P. System testing was performed by repeated operation of the instrument under all required circumstances. Y2K testing was performed simultaneously with code validation following a protocol prescribed by the SRS Y2K subcommittee that required assays with dates varying throughout the expected useful life of the RAS-P, particularly those bracketing Y2K boundaries. Performance history has been compiled demonstrating reliability (system availability), diversability (the ability to alter assay parameters and obtain results quickly), and measurement control characteristics

  20. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  1. Air National Guard Installation Restoration Program Site Investigation Report, 185th Tactical Fighter Group, Iowa Air National Guard, Sioux Gateway Airport, Sergeant Bluff, Iowa

    Science.gov (United States)

    1991-10-01

    IDPC /76a-3 I# - iV -I U I TABLE OF CONTENTS (continued) FINAL SITE INVESTIGATION REPORT LIST OF FIGURES Number TitlePage 1.1 Site Locations 1-4 1.2 Site...for Laboratory Analysis 4-62 4.17 Detected Compounds in Soil Samples - Site 2 4-63 4.18 Detected Compounds in Water Samples - Site 2 4-65 " iDPC /7a36...USEPA - United States Environmental Protection Agency UST - underground storage tank " IDPC /7"-3" - viii - I FINAL EXECUTIVE SUMMARY This report documents

  2. Nuclear Site Remediation and Restoration during Decommissioning of Nuclear Installations. A Report by the NEA Co-operative Programme on Decommissioning

    International Nuclear Information System (INIS)

    Orr, Peter; Mitchell, Nick; Mobbs, Shelly; Bennest, Terry; Abu-Eid, Rateb-Boby; Berton, Marie-Anne; Dehaye, Catherine Ollivier; Pellenz, Gilles; Cruikshank, Julian; Diaz Arocas, Paloma; Garcia Tapias, Ester; Hess, Norbert; Hong, Sam-Bung; Miller, Susan; Monken-Fernandes, Horst; ); Morse, John; Nitzsche, Olaf; Ooms, Bart; Osimani, Celso; Stuart Walker

    2014-01-01

    Decommissioning of nuclear facilities and related remedial actions are currently being undertaken around the world to enable sites or parts of sites to be reused for other purposes. Remediation has generally been considered as the last step in a sequence of decommissioning steps, but the values of prevention, long-term planning and parallel remediation are increasingly being recognised as important steps in the process. This report, prepared by the Task Group on Nuclear Site Restoration of the NEA Co-operative Programme on Decommissioning, highlights lessons learnt from remediation experiences of NEA member countries that may be particularly helpful to practitioners of nuclear site remediation, regulators and site operators. It provides observations and recommendations to consider in the development of strategies and plans for efficient nuclear site remediation that ensures protection of workers and the environment. (authors)

  3. Work plan for monitor well installation water and sediment sample collection aquifer testing and topographic surveying at the Riverton, Wyoming, UMTRA Project Site

    International Nuclear Information System (INIS)

    1995-06-01

    Investigations conducted during preparation of the site observational work plan (SOWP) at the Uranium Mill Tailings Remedial Action (UMTRA) Project site support a proposed natural flushing ground water compliance strategy, with institutional controls. However, additional site-specific data are needed to reduce uncertainties in order to confirm the applicability and feasibility of this proposed compliance strategy option. This proposed strategy will be analyzed in the site-specific environmental assessment. The purpose of this work plan is to summarize the data collection objectives to fill those data needs, describe the data collection activities that will be undertaken to meet those objectives, and elaborate on the data quality objectives which define the procedures that will be followed to ensure that the quality of these data meet UMTRA Project needs

  4. Installation Restoration Program. Site Investigation Report. Volume 1. 152nd Tactical Reconnaissance Group, Nevada Air National Guard, Reno Cannon International Airport, Reno, Nevada

    Science.gov (United States)

    1994-04-01

    measure RRI - Rapid Response Initiative RT - retention time s - seconds SDG - sample delivery group I SI - site investigation SMCLS - secondary maximum...tape and a compass and each grid node was marked with a wooden stake or fluorescent orange paint. At least one point on the grid was surveyed so the

  5. Independent technical support for the frozen soil barrier installation and operation at the Fukushima Daiichi Nuclear Power Station (F1 Site)

    Energy Technology Data Exchange (ETDEWEB)

    Looney, Brian B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jackson, Dennis G. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-23

    TEPCO is implementing a number of water countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of protection. In general, the strategy represents a comprehensive example of a “defense in depth” concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area and provide TEPCO the ability to reduce the amount of contaminated water that requires treatment and storage. The National Laboratory team supports the selection of artificial ground freezing and the incorporation of the frozen soil barrier in the contaminated water countermeasures -- the technical characteristics of a frozen barrier are relatively well suited to the Fukushima-specific conditions and the need for inflow reduction. Further, our independent review generally supports the TEPCO/Kajima design, installation strategy and operation plan.

  6. Installation of a Hydrologic Characterization Network for Vadose Zone Monitoring of a Single-Shell Tank Farm at the U. S. Department of Energy Hanford Site

    International Nuclear Information System (INIS)

    Gee, Glendon W.; Ward, Anderson L.; Ritter, Jason C.; Sisson, James B.; Hubbell, Joel M.; Sydnor, Harold A.

    2001-01-01

    The Pacific Northwest National Laboratory, in collaboration with the Idaho National Engineering and Environmental Laboratory and Duratek Federal Services, deployed a suite of vadose-zone instruments at the B Tank Farm in the 200 E Area of the Hanford Site, near Richland, Washington, during the last quarter of FY 2001. The purpose of the deployment was to obtain in situ hydrologic characterization data within the vadose zone of a high-level-waste tank farm. Eight sensor nests, ranging in depth from 67 m (220 ft) below ground surface (bgs) to 0.9 m (3 ft) bgs were placed in contact with vadose-zone sediments inside a recently drilled, uncased, borehole (C3360) located adjacent to Tank B-110. The sensor sets are part of the Vadose Zone Monitoring System and include advanced tensiometers, heat dissipation units, frequency domain reflectometers, thermal probes, and vadose zone solution samplers. Within the top meter of the surface, a water flux meter was deployed to estimate net infiltration from meteoric water (rain and snowmelt) sources. In addition, a rain gage was located within the tank farm to document on-site precipitation events. All sensor units, with the exception of the solution samplers, were connected to a solar-powered data logger located within the tank farm. Data collected from these sensors are currently being accessed by modem and cell phone and will be analyzed as part of the DOE RL31SS31 project during the coming year (FY 2001)

  7. Large scale wind energy conversion system (WECS) design and installation as affected by site wind energy characteristics, grouping arrangement, and social acceptance. [Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Ljungstrom, O

    1977-01-01

    The Swedish wind energy prospecting program includes special features of determining site wind characteristics and design of WECS group stations, which are described briefly, such as applications of normalized WDP-Wind Duration Profiles, WHP-Wind Height Profiles and how these are affected by site location and terrain roughness. A set of WEC-Wind Energy Classes (1 to 4) is introduced as an aid in territorial wind energy surveys. A survey of Sweden's WEPA-Wind Energy Producing Areas--with associated distribution over WEC-2-4 is presented. In order to determine the corresponding wind energy production capacity, the problem of optimizing WECS group station design for cost effective energy production per land usage must be solved. Here, the effects of WECS unit size and spacing on specific annual energy production, TWh/km/sup 2/, yr, are analyzed with the use of specific group station models in the 40 to 100 MW capacity range, applying WECS unit sizes 50kW, 1 MW and 5 MW, studying the energy balance for typical group stations. By applying the specific productivity data for 1 to 5 MW systems, a survey of the WEPA-associated wind energy production capacity in Sweden is presented.

  8. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  9. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  10. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  11. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  12. LHC: installation du plus grand trajectographe au silicium du monde

    CERN Multimedia

    2008-01-01

    The installation of the largest silicon trajectograph of the world was concluded at CERN. Thursday December 13 at dawn, the silicon trajectograph with ribbons of CMS (*) began its trip from the principal site of CERN to its installation of experimentation.

  13. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  14. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    and requirements that should be considered in the regulation of decommissioning facilities for offshore installations. These facilities need sound expertise to be able to identify and deal with different types of waste, including hazardous waste such as heavy metals, other hazardous substances, low specific activity (LSA) radioactive material and asbestos. Facilities must be designed to allow safe handling of such waste, with no risk of runoff or infiltration into the soil. In addition, a decommissioning facility should have an effective collection system and an on-site treatment plant for contaminated water, including surface water. Each facility must have a sampling and analysis programme to monitor releases of the most relevant pollutants. The need for an environmental monitoring programme to follow developments in the recipient should also be considered. Other factors that must be closely monitored include noise and releases to air in connection with metal cutting and other operations. Moreover, decommissioning contracts must ensure that the costs of handling hazardous waste are met by the offshore operators. When decommissioning facilities for offshore installations are being sited, other interests must also be taken into account; for example, the use of nearby areas for housing, holiday housing or recreation. In addition, the implications for other sectors such as fisheries and agriculture must be taken into consideration. These are important issues that the municipalities must consider when preparing zoning plans and drawing up environmental impact assessments. In many cases, a regional authority is in a better position than a national one to make overall, cross-sectoral assessments of developments within the region. Nevertheless, the report recommends transferring the authority for regulating decommissioning facilities for offshore installations from the County Governors to the Climate and Pollution Agency. Regulating these facilities requires special

  15. Deliberated opinion of the Environment Authority on the request of modification of the exploitation of the basic nuclear installation (INB) nr 93 'Georges Besse' by EURODIF-Production of the Tricastin site (Drome and Vaucluse)

    International Nuclear Information System (INIS)

    2011-01-01

    This report proposes an environmental review of the content of a request for the modification of the decree authorizing the creation of the 'Georges Besse' INB 93 (basic nuclear installation), a uranium enrichment plant exploited by EURODIF-production on the Tricastin site. This modification notably deals with the PRISME operation. The report describes and discusses the objectives of this operation, its context and the concerned operation program. It indicated the concerned procedures. It discusses the style and content of the impact study from a general point of view, and outlines weaknesses and methodological problems. It more particularly discusses the analysis of the present site condition, the project presentation and justification, the analysis of impacts on the environment and on health, of impacts related to waste management, of non-radiological impacts on water, of impacts on air and on biodiversity, and of social and economic impacts. It also addresses the analysis of impacts of construction works. It finally discusses the analysis of the risk management study

  16. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  17. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  18. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  19. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  20. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  1. Baseline studies to select the most sound and sensitive sites to install continuous monitoring per sismo-geochemical networks. The case history of the Norcia-Amatrice-Spoleto seismic sequences (2016-2017)

    Science.gov (United States)

    Quattrocchi, F.; Gallo, F.

    2017-12-01

    The paper review methodologically and historically - in the frame of seismo-geochemical studies in Italy and abroad to select the most "sensitive" sites along active faults, mostly where structural geology is not able to discover "blind" faults or complex fault crossing systems, with maximum fluids-faults interaction. The paper is highlighting the "site specific" case histories and processes helping in networks design, gathered in occasion of strong-moderate earthquakes, gas-burst or groundwater evolution in geothermal-hydrocarbons field during EU projects (i.e., Geochemical Seismic Zonation, 3F-Faults-Fractures-Fluids Corinth). Some concepts are highlighted based on gather experimental data in 25 years: - if the network is in soil gas is necessary a preliminary study on groundwater too, to understand the sectors of shallow aquifers, as "buffer" bodies, more prone to be oversaturated by geogas from depth; a preliminary grid should consider both the CO2-CH4-Rn fluxes, all gas concentrations and isotopes analyses (TDIC, CH4 CO2 , rare gas) case by case described here, mostly where the regional faults are crossing each other and where a carrier gas is acting i.e., CO2. It is very un-correct to install mono-parametric stations, i.e. only Radon to understand the real WRI processes. - if the network is in groundwater is very important a preliminary study before, during and after seismic sequences, to realize where the maximum anomalies (i.e., anomalous animal behavior, temperature increasing, geochemical anomalies, new gas relase) are and will be envisaged, as found for the Umbria-Marche border (the Colfiorito 1997-1998 and the 2016-2017 Norcia-Amatrice seismic sequences), where a deep pore-pressure dominated situation could be constrained by seismo-geochemistry, along "still silent" close fault segments too. if the network is in groundwater is very important a geochemical multidisciplinary approach to constrain the segment length and relative maximum magnitude.

  2. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  3. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  4. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  5. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  6. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  7. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  8. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  9. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  10. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  11. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  12. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  13. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  14. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  15. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  16. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  17. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  18. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  19. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  20. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  1. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  2. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  3. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  4. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  5. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  6. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  7. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  8. Installation of an innovative remedial technology

    International Nuclear Information System (INIS)

    Hines, B.

    1995-01-01

    The major goal of the Lasagna trademark project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE's sites

  9. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  10. Childhood cancer and nuclear installations: a review

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1998-01-01

    Many epidemiological studies of childhood cancer around nuclear installations have been conducted in recent years. This article reviews results from Great Britain and elsewhere. Geographical studies have indicated raised risks of childhood leukaemia around some British nuclear installations. However, environmental assessments suggest that the findings are unlikely to be due to radioactive releases from the sites. Case-control studies have allowed more detailed investigation of putative risk factors than is possible from geographical studies. In particular, a recent national study in Britain does not support the hypothesis raised by an earlier study in West Cumbria that paternal radiation exposure prior to conception may increase the risk of leukaemia and non-Hodgkin's lymphoma in offspring. Other studies suggest that childhood leukaemia may have an infective basis, although there is still uncertainty about whether this would explain the findings around nuclear installations. The UK Childhood Cancer Study may provide more information on the causes of these diseases. (author)

  11. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  12. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  13. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  14. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  15. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  16. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  17. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  18. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  19. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  20. The legal provisions and practices of public participation in the decision-making process relating to siting and operation of nuclear installations: results and conclusions of a survey based on national replies to an NEA/IAEA international questionnaire

    International Nuclear Information System (INIS)

    Freymond, J.F.; Ecoffey, D.

    1993-01-01

    This study is structured in the same way that the questionnaire submitted by NEA and IAEA. The chapter one is on the institutional frame governing the elaboration of nuclear policy, elaboration of safety rules, and installations agreements. It takes the question of the distribution of competences relative to authorize nuclear facilities in the case of federal states. The chapter two makes an inventory of juridical dispositions to public participation in nuclear decision-making. The chapter three explains the definition of what is the 'public'; how he can participate is studied in chapters four and five; finally the advertising to public participation and cost estimation are made in the chapters six and seven

  1. UK nuclear installations

    International Nuclear Information System (INIS)

    Gronow, W.S.

    Regulations and conditions for the commissioning of nuclear power plants in the UK, their siting, licence conditions, design safety assessment, inspection during construction and conditions for safety in operation are listed. (J.P.)

  2. Wind Energy in the Backyard of our House?! Environmental Perception of Social and Environmental Impacts in the Installation and Operation of a Plant in the Community of the Site in Cumbe Aracati-CE

    Directory of Open Access Journals (Sweden)

    Roseilda Nunes Moreira

    2013-06-01

    Full Text Available This theoretical and empirical study aimed to understand the perception that local people have about the environmental impacts caused by the installation and operation of an eolic enterprise in the surrounding community. The study of environmental perception is crucial for us to better understand the interrelationships between man and the environment, expectations, desires, satisfactions and dissatisfactions, judgments and behaviors. The spatial area adopted for the study is the community of Cumbe in Aracati / CE for its geomorphologic and climatologic presented sufficient conditions for the installation and use of wind energy in order to change the energy matrix of the municipality. This research is exploratory and descriptive design literature and case study, where to collect the data were collected through interviews with open questions to a group of residents near the eolic enterprise investigated and a prosecutor's Aracati. In the field research, we investigated the environmental impacts caused by the eolic plant, the level of understanding in the community about wind energy and the enterprise's contribution to community development, among other issues.

  3. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  4. Safety of installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 5 of the document contains some details about the siting, designed and construction, operation, maintenance, inspection, testing, procedures for responding to anticipated operational occurrences and accidents, engineering and technical support, reporting of significant incidents, operating experience feedback, radioactive waste and spent fuel.

  5. Safety of installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 5 of the document contains some details about the siting, designed and construction, operation, maintenance, inspection, testing, procedures for responding to anticipated operational occurrences and accidents, engineering and technical support, reporting of significant incidents, operating experience feedback, radioactive waste and spent fuel

  6. Safety of installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 5 of the document contains some details about the siting, designed and construction, operation, maintenance, inspection, testing, procedures for responding to anticipated operational occurrences and accidents, engineering and technical support, reporting of significant incidents, operating experience feedback, radioactive waste and spent fuel

  7. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Jungmann, A.

    1976-01-01

    A nuclear reactor metal pressure vessel is surrounded by a concrete wall forming an annular space around the vessel. Thermal insulation is in this space and surrounds the vessel, and a coolant-conductive layer is also in this space surrounding the thermal insulation, coolant forced through this layer reducing the thermal stress on the concrete wall. The coolant-conductive layer is formed by concrete blocks laid together and having coolant passages, these blocks being small enough individually to permit them to be cast from concrete at the reactor installation, the thermal insulation being formed by much larger sheet-metal clad concrete segments. Mortar is injected between the interfaces of the coolant-conductive layer and concrete wall and the interfaces between the fluid-conductive layer and the insulation, a layer of slippery sheet material being interposed between the insulation and the mortar. When the pressure vessel is thermally expanded by reactor operation, the annular space between it and the concrete wall is completely filled by these components so that zero-excursion rupture safeguard is provided for the vessel. 4 claims, 1 figure

  8. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  9. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  10. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  11. Well installation, single-well testing, and particle-size analysis for selected sites in and near the Lost Creek Designated Ground Water Basin, north-central Colorado, 2003-2004

    Science.gov (United States)

    Beck, Jennifer A.; Paschke, Suzanne S.; Arnold, L. Rick

    2011-01-01

    This report describes results from a groundwater data-collection program completed in 2003-2004 by the U.S. Geological Survey in support of the South Platte Decision Support System and in cooperation with the Colorado Water Conservation Board. Two monitoring wells were installed adjacent to existing water-table monitoring wells. These wells were installed as well pairs with existing wells to characterize the hydraulic properties of the alluvial aquifer and shallow Denver Formation sandstone aquifer in and near the Lost Creek Designated Ground Water Basin. Single-well tests were performed in the 2 newly installed wells and 12 selected existing monitoring wells. Sediment particle size was analyzed for samples collected from the screened interval depths of each of the 14 wells. Hydraulic-conductivity and transmissivity values were calculated after the completion of single-well tests on each of the selected wells. Recovering water-level data from the single-well tests were analyzed using the Bouwer and Rice method because test data most closely resembled those obtained from traditional slug tests. Results from the single-well test analyses for the alluvial aquifer indicate a median hydraulic-conductivity value of 3.8 x 10-5 feet per second and geometric mean hydraulic-conductivity value of 3.4 x 10-5 feet per second. Median and geometric mean transmissivity values in the alluvial aquifer were 8.6 x 10-4 feet squared per second and 4.9 x 10-4 feet squared per second, respectively. Single-well test results for the shallow Denver Formation sandstone aquifer indicate a median hydraulic-conductivity value of 5.4 x 10-6 feet per second and geometric mean value of 4.9 x 10-6 feet per second. Median and geometric mean transmissivity values for the shallow Denver Formation sandstone aquifer were 4.0 x 10-5 feet squared per second and 5.9 x 10-5 feet squared per second, respectively. Hydraulic-conductivity values for the alluvial aquifer in and near the Lost Creek Designated

  12. Offshore nuclear installations

    International Nuclear Information System (INIS)

    Albano, R.

    1976-01-01

    It is possible now to foresee the creation of nuclear power plants on floating or fixed islands although from the safety viewpoint, floating islands are preferable. The definition of the legal nature of artificial islands raises a first problem insofar as artificial islands are neither islands nor ships. Furthermore, their statute would differ according to whether they were sited in territorial seas or in the new 'economic zones'. This leads to consideration of the applicability of Italian maritime legislation to nuclear power plants on floating islands without setting aside that of international regulations on radioactive maritime pollution. (N.E.A.) [fr

  13. Installation Guidelines for Solar DHW Systems in One- and Two-Family Dwellings. Second Edition.

    Science.gov (United States)

    Hollander, Peter; And Others

    Described are some of the better techniques for installing solar domestic hot water (DHW) systems. By using these guidelines, along with the manufacturer's manual, professional installation contractors and skilled homeowners should be able to install and fill a solar DHW system. Among the topics considered are system layouts, siting, mounting…

  14. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  15. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  16. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  17. Code on the safety of civilian nuclear fuel cycle installations

    International Nuclear Information System (INIS)

    1996-01-01

    The 'Code' was promulgated by the National Nuclear Safety Administration (NSSA) on June 17, 1993, which is applicable to civilian nuclear fuel fabrication, processing, storage and reprocessing installations, not including the safety requirements for the use of nuclear fuel in reactors. The contents of the 'Code' involve siting, design, construction, commissioning, operation and decommissioning of fuel cycle installation. The NNSA shall be responsible for the interpretation of this 'Code'

  18. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  19. Leasing of nuclear installations

    International Nuclear Information System (INIS)

    Capaccioli, Enzo.

    1977-01-01

    The high costs to be borne in industrialised countries for expanding nuclear programmes make leasing, in terms of funding, an attractive proposition even in times of recession. This system is advantageous to both parties: the bodies providing funds make substantial profits without untoward risk, given the internationally-recognised regime of channelling liability onto the nuclear operator and because such contracts usually provide that ownership of the property involved will eventually be transferred to the operator. The latter obtains the sums needed by a simple, speedy procedure enabling him to start operations more quickly than if he had to seek funds by a more conventional method. The problem in Italy is that nuclear electricity generating plants are a State monopoly while leasing is a private enterprise. The Italian 1975 Siting Act provides a consultation procedure of regional and State authorities, with the ultimate decision taken by the latter. To maintain the momentum, arrangements could be made for leasing, before starting the licensing procedure proper according to the Act. (NEA) [fr

  20. Installation of a Wastewater SCADA Monitoring System at Fort Bragg, NC

    National Research Council Canada - National Science Library

    Mullaney, Joe

    2004-01-01

    .... The Wastewater SCADA Monitoring System was installed to monitor 26 remote sites. A detailed radio study of the area verified the feasibility of using radio equipment to transfer data from these sites...

  1. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  2. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  3. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  4. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  5. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  6. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  7. The control of base nuclear installations; Le controle des installations nucleaires de base (INB)

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2009-04-15

    The Authority of Nuclear Safety ( A.S.N). presents in this column the current events of the control of the nuclear base installations during november, december 2008 and january 2009, classified by nuclear site. This information is also available in real-time on the A.S.N. web site, www.asn.fr, in the column 'news'. We can consult all the notices of significant incident published as well as the following letters of inspection, the notices of information about the reactors shutdown, press releases and the A.S.N. information notes. (N.C.)

  8. The hidden costs of installing Xpert machines in a tuberculosis high-burden country: experiences from Nigeria.

    Science.gov (United States)

    Abdurrahman, Saddiq Tsimiri; Emenyonu, Nnamdi; Obasanya, Olusegun Joshua; Lawson, Lovett; Dacombe, Russell; Muhammad, Muhammad; Oladimeji, Olanrewaju; Cuevas, Luis Eduardo

    2014-01-01

    Since the endorsement of GeneXpert MTB/RIF by the WHO, many countries have embarked on implementing this technology. We outline the cost of installing GeneXpert in district hospitals in Abuja, Nigeria. We prospectively documented costs related to the installation of GeneXpert at five sites. Costs were collected from receipts received from suppliers and normalized to USD 2012 values. Costs were often identified after initiating installation for many reasons. Installation varied widely between sites with sufficient space and power supply; sites with insufficient space or power supply and costs not directly associated with site installation. The basic cost for installation was USD 2,621.98 per machine. Sites that required additional space cost close to USD 7,000.00. Space and power requirements have a significant effect on installation costs. Countries need to carefully consider the placement of Xpert machines based on the quality and size of the available infrastructure.

  9. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  10. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  11. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  12. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  13. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  14. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  15. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  16. YB0 SERVICES INSTALLATION COMPLETED

    CERN Document Server

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  17. Small Wind Site Assessment Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Tim [Advanced Energy Systems LLC, Eugene, OR (United States); Preus, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    Site assessment for small wind energy systems is one of the key factors in the successful installation, operation, and performance of a small wind turbine. A proper site assessment is a difficult process that includes wind resource assessment and the evaluation of site characteristics. These guidelines address many of the relevant parts of a site assessment with an emphasis on wind resource assessment, using methods other than on-site data collection and creating a small wind site assessment report.

  18. Caractérisation de la perméabilité des couches constituant la barrière passive des installations de stockage de déchets non dangereux Permeability characterization of the geological barrier of non dangerous landfill sites

    Directory of Open Access Journals (Sweden)

    Mouthier B.

    2012-09-01

    Full Text Available Pour obtenir son autorisation d’exploiter, une Installation de Stockage de Déchets Non Dangereux (ISDND doit justifier réglementairement sa favorabilité géologique. Le « Guide de bonnes pratiques pour les reconnaissances géologiques » de l’AFNOR fournit les critères d’aptitude du site à recevoir une ISDND et les moyens à mettre en œuvre, dont ceux qui concernent la perméabilité des couches géologiques qui protègent le milieu naturel. La mesure de la perméabilité in situ, en forage, des matériaux peu à très peu perméables des deux couches de la barrière de sécurité passive, est une opération délicate qui nécessite une mise en œuvre soignée respectant les normes appropriées, choisies en fonction des gammes de perméabilité attendues. Plusieurs types d’essai en forage sont présentés. In order to get administrative authorization, a non dangerous waste landfill site (ISDND, must justify a favourable geological context, which follows the AFNOR “Guide de bonnes pratiques pour les reconnaissances géologiques ». Criteria and technical means are described among which the in situ and lab permeability determination processes. The low and very low permeability coefficient to be measured within the deep argillaceous formations of a landfill site, is a delicate operation which must be representative and accurate. Depending the permeability range, several norms are proposed.

  19. Analysis of Bright Harvest Remote Analysis for Residential Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Nangle, John [National Renewable Energy Lab. (NREL), Golden, CO (United States); Simon, Joseph [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-06-17

    Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.

  20. Statement of nuclear incidents at nuclear installations: first quarter 1994

    International Nuclear Information System (INIS)

    1994-06-01

    As a requirement of the 1974 Health and Safety at Work Act, the United Kingdom Health and Safety Inspectorate is required to publish reports of nuclear incidents at nuclear installations. This report covers the period 1st January to 31st March 1994. Two incidents are reported for Dungeness A Power Station, one at the Amersham International building on site at Harwell Laboratory, one at AEA Technology's Windscale Plant and one at British Nuclear Fuels Limited's Sellafield site. (UK)

  1. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  2. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  3. Advanced Metering Installations – A Perspective from Federal Sites

    Energy Technology Data Exchange (ETDEWEB)

    Earni, Shankar [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area

    2016-05-02

    This report is intended to provide guidance to the United States Department of Energy (DOE) and other federal agencies to highlight some of the existing practices related to advanced building metering systems. This study identified some of the existing actions related to advanced meter data and proposes how advanced metered data can be employed to develop robust cost effective measurement and verification (M&V) strategies. This report proposes an integrated framework on how advanced meter data can be used to identify energy conservation opportunities and to develop proactive M&V strategies to ensure that the savings for energy projects are being realized. This information will help improve metering, feedback, and dashboard implementations for reducing energy use at DOE facilities, based on lessons learned from various advanced metering implementations.

  4. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  5. The Dismantling of Nuclear Installations in France

    International Nuclear Information System (INIS)

    Bonnaure, P.

    2011-01-01

    As we saw in the previous article by Pierre Bonnaure, though it has long been decried for the dangers inherent in its production structures and the very long-lived waste that it generates, nuclear power may yet recover its credibility, particularly in France. However, on close examination, we see that the nuclear industry is beset by a number of unresolved questions, beginning with the dismantling of installations that have become obsolete or are set to become so. Nuclear power took off after the Second World War, but several generations of technology have been developed since then, and most currently functioning power-stations - mainly second-generation installations - are theoretically nearing the end of their useful lives, at least in terms of what was said when they were being built. The problem therefore arises of their dismantling and the clean-up of the sites on which they were built, a thorny question on which Pierre Bonnaure casts light in this article (prospects, strategies, financing, management of waste etc.). Unfortunately, it emerges that in France nothing has really been resolved, that public debate on the matter is decidedly limited and that investment (both financial investment and research) is not commensurate with the needs of a sector which is, after all, the source of three quarters of national electricity production. (author)

  6. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  7. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  8. Quality assurance in nuclear installations

    International Nuclear Information System (INIS)

    Torres M, Nelson.

    1985-08-01

    It has been proven that the bad quality of products, equipment, installations, and services is not due to the lack of tests, experiments and verifications. The main causes are associated with insufficient organization of the activities that have influence on the quality. The garantee of quality is conceptualized as an appropriate instrument composed of normalized criteria initially in advanced technologies. Such as nuclear science and aerospace technology. However, with the appropriate modifications it can be applied to conventional technologies

  9. Method of installing well conductors

    International Nuclear Information System (INIS)

    Houser, D.M.

    1991-01-01

    This patent describes a method of installing a well conductor in a marine environment. It comprises sealing a well conductor with a watertight plug; submerging the conductor from an elevated platform; adding additional conductor lengths to the conductor as needed thereby forming a conductor string; adjusting the buoyancy of the string to control the lowering of the string to the sea floor; and drilling through the plug after the conductor string has achieved the desired penetration depth

  10. Seismic evaluation of nuclear installations

    International Nuclear Information System (INIS)

    Mattar Neto, Miguel

    1997-01-01

    Some considerations regarding extreme external events, natural or man-induce, such as earthquakes, floods, air crashes, etc, shall be done for nuclear facilities to minimizing the potential impact of the installation on the public and the environment. In this paper the main aspects of the seismic evaluation of nuclear facilities (except the nuclear power reactors) will be presented based on different codes and standards. (author). 7 refs., 2 tabs

  11. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  12. Safety Assessment in Installation of Precast Concrete

    Directory of Open Access Journals (Sweden)

    Yashrri S.N.

    2014-03-01

    Full Text Available This study was carried out to identify the safety aspects and the level of safety during the installation process in construction sites. A questionnaire survey and interviews were done to provide data on safety requirements in precast concrete construction. All of the interviews and the research questionnaire survey were conducted among contractors that are registered as class 1 to class 7 with the Construction Industry Development Board (CIDB and class A to class G with Pusat Khidmat Kontraktor (PKK in Penang. Returned questionnaires were analysed with the use of simple percentages and the Likert Scale analysis method to identify safety aspects of precast construction. The results indicate that the safety aspect implemented by companies involved in the precast construction process is at a good level in the safety aspect during bracing, propping, welding and grouting processes and at a very good level of safety in general aspects and safety aspects during lifting processes.

  13. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  14. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  15. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  16. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  17. Search for low energy quasi-vertical muons with an underwater cosmic neutrino detector, environmental study of the detector setting; Recherche de muons quasi verticaux de basse energie a l'aide d'un detecteur de neutrinos cosmiques sous-marin et etude environnementale de son site d'installation

    Energy Technology Data Exchange (ETDEWEB)

    Blondeau, F. [CEA/Saclay, Dept. d' Astrophysique, de la Physique des Particules, de la Physique Nucleaire et de l' Instrumentation Associee (DAPNIA), 91 - Gif-sur-Yvette (France)]|[Paris-7 Univ., 75 (France)

    1999-06-01

    The European collaboration named ANTARES aims at operating a large submarine neutrino telescope. Mooring lines make up this detector. Each is about four hundred metres high and equipped with photomultiplier tubes. These tubes record the Cherenkov light emitted by muons resulting from the interaction of neutrinos with matter. It was chosen to install the telescope in the Mediterranean, off the shore of Toulon, by a depth of twenty-three hundred metres. One chapter of this dissertation is devoted to the environment parameters of this site: amount of natural light, fouling of glass elements and water transparency is reviewed. Such a disposal is originally designed to look for possible astronomic neutrino sources emitting neutrinos, thus being complementary with the study of our Universe relying on gamma rays. It is shown in this dissertation that two other current riddles in physics can be investigated by ANTARES, when a specific analysis is taken into account: what is the mass of the neutrinos on the one hand (via the phenomenon called neutrino oscillations), and in the other hand the evidence for a new particle which could participate to the nature of the dark matter in the Universe. This analysis is based upon the detection of nearly vertical muons (zenith angle less than fifteen degrees), with an energy lower than 100 GeV. (author)

  18. Search for low energy quasi-vertical muons with an underwater cosmic neutrino detector, environmental study of the detector setting; Recherche de muons quasi verticaux de basse energie a l'aide d'un detecteur de neutrinos cosmiques sous-marin et etude environnementale de son site d'installation

    Energy Technology Data Exchange (ETDEWEB)

    Blondeau, F [CEA/Saclay, Dept. d' Astrophysique, de la Physique des Particules, de la Physique Nucleaire et de l' Instrumentation Associee (DAPNIA), 91 - Gif-sur-Yvette (France); [Paris-7 Univ., 75 (France)

    1999-06-01

    The European collaboration named ANTARES aims at operating a large submarine neutrino telescope. Mooring lines make up this detector. Each is about four hundred metres high and equipped with photomultiplier tubes. These tubes record the Cherenkov light emitted by muons resulting from the interaction of neutrinos with matter. It was chosen to install the telescope in the Mediterranean, off the shore of Toulon, by a depth of twenty-three hundred metres. One chapter of this dissertation is devoted to the environment parameters of this site: amount of natural light, fouling of glass elements and water transparency is reviewed. Such a disposal is originally designed to look for possible astronomic neutrino sources emitting neutrinos, thus being complementary with the study of our Universe relying on gamma rays. It is shown in this dissertation that two other current riddles in physics can be investigated by ANTARES, when a specific analysis is taken into account: what is the mass of the neutrinos on the one hand (via the phenomenon called neutrino oscillations), and in the other hand the evidence for a new particle which could participate to the nature of the dark matter in the Universe. This analysis is based upon the detection of nearly vertical muons (zenith angle less than fifteen degrees), with an energy lower than 100 GeV. (author)

  19. Two passive groundwater treatment installations at DOE facilities

    International Nuclear Information System (INIS)

    Barton, W.D.; Craig, P.M.; Stone, W.C.

    1997-01-01

    Groundwater is being successfully treated by reactive media at two DOE sites. Passive treatment utilizing containerized treatment media has been installed on a radioactive groundwater seep at Oak Ridge National Lab, Oak Ridge, Tennessee, and on a TCE plume at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio. In both applications, flow is conducted by gravity through canisters of reactive treatment media. The canister-based treatment installation at ORNL utilizes a natural sodium-chabazite zeolite to remove radiological cations (Sr, Cs) from contaminated groundwater at greater than 99.9% efficiency. Portsmouth is currently conducting tests on three different types of treatment media for reductive dehalogenation of TCE

  20. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  1. Safety culture in nuclear installations - The role of the regulator

    International Nuclear Information System (INIS)

    Karigi, Alice W.

    2002-01-01

    Safety culture is an amalgamation of values, standards, morals and norms of acceptable behavior by the licensees, Radiation workers and the Regulator. The role played by a Regulator in establishing safety culture in a nuclear installation is that related to Authorization, review, assessment, inspection and enforcement. The regulator is to follow the development of a facility or activity from initial selection of the site through design, construction, commissioning, radioactive waste management through to decommissioning and closure. He is to ensure safety measures are followed through out the operation of the facility by laying down in the license conditions of controlling construction of nuclear installations and ensuring competence of the operators. (author)

  2. Hydrocarbon and Toxic Metal Contamination from Tank Installations in a Northwest Greenlandic Village

    DEFF Research Database (Denmark)

    Fritt-Rasmussen, Janne; Jensen, Pernille Erland; Christensen, Rune Haubo Bojesen

    2012-01-01

    Contamination from tank installations in the Arctic is an important issue, since tanks are a necessary feature of all communities, and may be a source of local pollution. Soil samples from below and around three tank installations and one reference site in the Northwest Greenlandic village...

  3. Ground mounted photovoltaic installations. Guide for an impact study

    International Nuclear Information System (INIS)

    2011-01-01

    Legally, an impact study must be performed for ground mounted photovoltaic installations with a power greater than 250 kW. This guide is aimed at helping the actors of the photovoltaic sector to perform impact studies. After the description of the characteristics of a photovoltaic installation (principles, technical characteristics of a ground mounted installation, impact of photovoltaic systems on climate) and a presentation of the legal framework (European commitments, Grenelle de l'Environnement, applicable procedures), this report present the objectives and approach of an impact study, describes how the environment is taken into account from the early stages of a project, how the impact study is to be prepared. The last part describes the different components of the impact study: legal content, project description, analysis of the site initial status and environment, analysis of the project effects, rationale for the choice of the project

  4. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  5. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  6. Rehyd development and installation report

    International Nuclear Information System (INIS)

    Schuch, R.L.; Woodall, H.N.

    1977-12-01

    Rehyd, a low-impedance, HYDRA-type, water transmission line for bremsstrahlung exposures, was installed on the north side of the REBA facility. Rehyd produces 300 kA beams of 1.2 MeV electrons with a pulse width of 170 ns. Nominal x-ray exposure dose capabilities of 7 cal/g and 20 to 25 kJ were realized thus far. A description is given of the specific design parameters and facility layouts including the unique features of the REBA Marx generator/Rehyd line energy-transfer system. Diode configurations, magnetic-field applications, and output measurements are also presented

  7. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  8. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  9. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  10. FFTF report: FFTF piping installation and welding techniques

    International Nuclear Information System (INIS)

    Gilles, J.

    1975-01-01

    The main sodium piping with a diameter of 16'' or 28 '' is being installed at the FFTF construction site starting in December 1974. The supplier and authority demarcations are: Combustion Engineering supplies the reactor vessel, guard vessel and adjoining pipes and uses the machine welding equipment ''Dimetrics''; for the piping system of the primary and secondary loops the pipes manufactured by Rollmet at HUICO, Pasco, were delivered and prefabricated there, as far as compatible with the installation. ''Astroarc'' welding machines are used by Bechtel for the piping prefabrication in the weld laboratory as well as on site at the construction site. Technical welding problems occurring during the course of the installation at the construction site and several during this time are described. At present 6 weld seams in the reactor and 14 weld seams in the secondary loop are accepted. The requirement exists to carry out as many welds as possible automatically, in order to produce sodium pipe welds of high technical quality and which are reproducible. The welding equipment is described

  11. Decree no. 96-978 from October 31, 1996 giving permission to the French atomic energy Commission (CEA) to create a basic nuclear installation intended to maintain under supervision and in an intermediate dismantling state the old basic nuclear installation no. 28, named Monts d'Arree-EL 4 nuclear power plant (a decommissioned reactor), in the Monts d'Arree site of the Loqueffret town (Finistere, Brittany)

    International Nuclear Information System (INIS)

    Borotra, F.; Lepage, C.

    1996-01-01

    This decree from the French ministry of industry and postal services gives permission to the CEA to create a new basic nuclear installation, named EL 4D, which is devoted to the storage of materials from the partially dismantled Monts d'Arree EL 4 reactor. Thus, the CEA is allowed to carry out confining works on the reactor building with the closure of all apertures with the exception of the personnel entry sieve, on the circuits and equipments of the reactor vessel with the plugging of fuel channels, heavy water, helium and demineralized water pipes and of the heads of control rod drive mechanisms and other channels, and on the primary coolant circuit outside the reactor vessel and the steam generators with the installation of welded hatches. The irradiated fuels building, the solid wastes repository, the ventilation building, the heavy water and helium circuits, the fuel handling systems and the effluents treatment plant will be completely dismantled. The other buildings will be pulled down. The rest of the decree enumerates the general technical and safety prescriptions which have to be followed in order to ensure the protection of the personnel against ionizing radiations and of the environment against radioactive pollution. (J.S.)

  12. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  13. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  14. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  15. Memorandum of Understanding on cooperation and consultation on nuclear installations near borders

    International Nuclear Information System (INIS)

    1977-01-01

    This Agreement signed on 27 September 1977 lays down that the Contracting Parties will inform each other about all nuclear installations constructed along the common border. Nuclear installations within the meaning of the Agreement are installations for the production, processing, reprocessing, manufacture or fission of nuclear fuels and radioactive waste storage. The information to be communicated includes plans and decisions on siting, construction and operation of such installations and relevant documents. The Agreement provides for consultation between the Parties on safety aspects and lays down in detail all the conditions for communication of information. (NEA) [fr

  16. Feasible research on VLLW disposal in control area of nuclear installation

    International Nuclear Information System (INIS)

    Kong Jinsong; Guo Weiqun

    2013-01-01

    Based on the basic requirements on the VLLW landfill disposal specified by the national codes and standards, a on-site disposal of VLLW in the control area of nuclear installation was proposed. A detail analysis of the advantages and disadvantages about the disposal method and the problem to be solved were described. Results showed that the on-site disposal of VLLW in the control area of nuclear installation was feasible in practice. (authors)

  17. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  18. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  19. Cancer risks near nuclear installations?

    International Nuclear Information System (INIS)

    Hubert, D.

    1999-01-01

    The descriptive studies actually at disposal bring to the fore some children leukemia aggregates around some nuclear sites. (Sellafield, and Dounreay in the United kingdom, Kruemmel in Germany). Nevertheless, the studies grouping several sites do not find any global excess. The analytical studies have not brought any answer until now, but have allowed to eliminate some hypothesis such the Gardner genetic hypothesis. (N.C.)

  20. Statement of nuclear incidents at nuclear installations. Third quarter 2001

    International Nuclear Information System (INIS)

    2002-01-01

    A statement of nuclear incidents at nuclear installations in Britain during the third quarter of 2001 is published today by the Health and Safety Executive (copy attached). It covers the period 1 July to 30 September 2001. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974. Normally each incident mentioned in HSE's Quarterly Incident Statements will already have been made public by the licensee or site operator either through a press statement or by inclusion in the newsletter for the site concerned. The locations of the installations mentioned in the statement are as follows: Heysham 1 (British Energy Generation plc), Sellafield (British Nuclear Fuels plc), Chapelcross (British Nuclear Fuels plc)

  1. Comparative evaluation of different offshore wind turbine installation vessels for Korean west–south wind farm

    Directory of Open Access Journals (Sweden)

    Dang Ahn

    2017-01-01

    Full Text Available The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west–south wind farm (Test bed 100 MW, Demonstrate site 400 MW. We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel, jack-up barge, or floating crane … etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west–south wind farm.

  2. Wind profiler installed in Antarctica

    Science.gov (United States)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  3. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  4. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  5. Solar space and water heating system installed at Charlottesville, Virginia

    Science.gov (United States)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  6. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  7. Selection and Characterization of Geological Sites able to Host a Pilot-Scale CO2 Storage in the Paris Basin (GéoCarbone-PICOREF Choix et caractérisation de sites géologiques propices à l’installation d’un pilote pour le stockage de CO2 dans le bassin de Paris (GéoCarbone-PICOREF

    Directory of Open Access Journals (Sweden)

    Brosse É.

    2010-06-01

    Full Text Available The objective of the GéoCarbone-PICOREF project was to select and characterize geological sites where CO2 storage in permeable reservoir could be tested at the pilot scale. Both options of storage in deep saline aquifer and in depleted hydrocarbon field were considered. The typical size envisioned for the pilot was 100 kt CO2 per year. GéoCarbone-PICOREF initially focused on a “Regional Domain”, ca. 200 × 150 km, in the Paris Basin. It was attractive for the following reasons: detailed geological data is available, due to 50 years of petroleum exploration; basin-scale deep saline aquifers are present, with a preliminary estimate of storage capacity which is at the Gt CO2 level, namely the carbonate Oolithe Blanche Formation, of Middle Jurassic age, generally located between 1500 and 1800 m depths in the studied area, and several sandstone formations of Triassic age, located between 2000 and 3000 m; several depleted oil fields exist: although offering storage capacities at a much lower level, they do represent very well constrained geological environments, with proven sealing properties; several sources of pure CO2 were identified in the area, at a flow rate compatible with the pilot size, that would avoid capture costs. 750 km of seismic lines were reprocessed and organized in six sections fitted on well logs. This first dataset provided improved representations of: the gross features of the considered aquifers in the Regional Domain; the structural scheme; lateral continuity of the sealing cap rocks. An inventory of the environmental characteristics was also made, including human occupancy, protected areas, water resource, natural hazards, potential conflicts of use with other resources of the subsurface, etc. From all these criteria, a more restricted geographical domain named the “Sector”, ca. 70 × 70 km, was chosen, the most appropriate for further selection of storage site(s. The geological characterization of the Sector has

  8. Spectrometric assembly for portable installations

    International Nuclear Information System (INIS)

    Kluger, A.; Popescu, C.

    1997-01-01

    The components of the portable spectrometric assembly are: - the detecting probe with Na I(Tl) crystal and air-tight case of industrial type; - a microcomputer; - a unit of analogical processing of the signal from the detecting probe; - a single-channel analyzer with adjustable threshold; - commands and display module; - a source of high voltage; - an electrical supply battery. The device uses the method of gamma photons detection in energetic windows. Through theoretical and experimental studies carried out during the prototype development phase, the superiority of this method has been proved as compared with the installations which make use of the classical principle of photon integral detection. The achieved prototype has a basic program enabling the setting of all working parameters (measuring time, discriminating thresholds, discriminators operating conditions, etc.). Through the included interface RS232 it is possible to transmit the data to a more powerful computer in order to continually process the results. The spectrometric assembly, realized on the basis of micro-computers, can be used in a wide range of applications: measurement of thickness and erosion of walls and tubes, measurement of level in closed containers, of soil density, etc. The adjustment for specific application is performed only through a program modification. (authors)

  9. Installations having pressurised fluid circuits

    International Nuclear Information System (INIS)

    Rigg, S.; Grant, J.

    1977-01-01

    Reference is made to nuclear installations having pressurised coolant flow circuits. Breaches in such circuits may quickly result in much damage to the plant. Devices such as non-return valves, orifice plates, and automatically operated shut-off valves have been provided to prevent or reduce fluid flow through a breached pipe line, but such devices have several disadvantages; they may present large restrictions to normal flow of coolant, and may depend on the operation of ancillary equipment, with consequent delay in bringing them into operation in an emergency. Other expedients that have been adopted to prevent or reduce reverse flow through an upstream breach comprise various forms of hydraulic counter flow brakes. The arrangement described has at least one variable fluid brake comprising a fluidic device connected into a duct in the pressurised circuit, the device having an inlet, an outlet, a vortex chamber between the inlet and outlet, a control jet for introducing fluid into the vortex chamber, connections communicating the inlet and the outlet into one part of the circuit and the control jet into another region at a complementary pressure so that, in the event of a breach in the circuit in one region, fluid passes from the other region to enter the vortex chamber to stimulate pressure to create a flow restricting vortex in the chamber that reduces flow through the breach. The system finds particular application to stream generating pressure tube reactors, such as the steam generating heavy water reactor at UKAEA, Winfrith. (U.K.)

  10. ALARA in European nuclear installations

    International Nuclear Information System (INIS)

    Lefaure, C.; Croft, J.; Pfeffer, W.; Zeevaert, T.

    1995-01-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe

  11. ALARA in European nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Lefaure, C. [CEPN, Fontenay-Aux-Roses (France); Croft, J. [NRPB, Chilton, Didcot (United Kingdom); Pfeffer, W. [GRS, Koeln (Germany); Zeevaert, T. [SCK/CEN, Mol (Belgium)

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  12. ID Barrel installed in cryostat

    CERN Multimedia

    Apsimon, R.; Romaniouk, A.

    Wednesday 23rd August was a memorable day for the Inner Detector community as they witnessed the transport and installation of the central part of the inner detector (ID-barrel) into the ATLAS detector. Many members of the collaboration gathered to witness this moment at Point 1. After years of design, construction and commissioning, the outer two detectors (TRT and SCT) of the ID barrel were moved from the SR1 cleanroom to the ATLAS cavern. The barrel was moved across the car park from building 2175 to SX1. Although only a journey of about 100 metres, this required weeks of planning and some degree of luck as far as the weather was concerned. Accelerometers were fitted to the barrel to provide real-time monitoring and no values greater than 0.1 g were recorded, fully satisfying the transport specification for this extremely precise and fragile detector. Muriel, despite her fear of heights, bravely volunteered to keep a close eye on the detector. Swapping cranes to cross the entire parking lot, while Mur...

  13. Nuclear installations inspectorate a public opinion survey

    International Nuclear Information System (INIS)

    Lennie, S.E.; Davies, A.G.

    2001-01-01

    HM Nuclear Installations Inspectorate (HMNII) is the regulator responsible for the safety of licensed nuclear sites in the UK. Recognizing the need for public approval on future policy with respect to nuclear waste management, the NII commissioned a public opinion research programme amongst the UK general public. Opinion was sought on a number of issues including attitudes towards the industry in general, perception of nuclear waste and its management, tolerability of risk and attitudes towards current decommissioning plans. In response to the primary objectives of the survey the main findings are: current spontaneous level of concern over the industry in general is low (7%), and lower still for nuclear waste (3%). However, on prompting, 47% of respondents were very concerned about nuclear waste. Top of mind issues of concern about the industry are: nuclear waste; risk of accidents; health risks. Personal risk from nuclear waste is not of overt concern and is significantly less worrisome to respondents than risk from diseases like meningitis or cancer, smoking or road accidents. On being presented with a statement describing current UK decommissioning plans, the sample was generally in favour. However, this issue will require further research. (authors)

  14. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  15. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  16. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  17. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  18. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV; Especificacion de los requerimientos para tramitar una licencia de una instalacion independiente de almacenamiento temporal en seco de combustible gastado (ISFSI) en el sitio de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  19. Nuclear installations and childhood cancer in the UK

    International Nuclear Information System (INIS)

    Goldsmith, J.R.

    1992-01-01

    Data on cancer incidence and mortality near nuclear installations in England and Wales have been published, covering the period 1959-1980. Several age classes and a number of cancer sites have been included. Systematic analysis has so far been limited to cancer mortality. This suggests that childhood leukemia is unusually frequent near some types of installations and the excess is greater for years 0-9 than for later ages. In the earlier decade, 1959-1969, there was questionable consistency of incidence reporting. This report uses the incidence and mortality data only for the period 1971-1980; leukemia and non-leukemia cancer data for those 0-9 years are analyzed, and consistency of incidence reporting is evaluated by comparing incidence and mortality. For comparison with reported data for grouped local authority areas (LAAs) near to 21 different installations, 2 sources of expected incidence are used. The first is based on regional data, and the second is based on a group of LAAs similar in location, urban/rural character and population size. The results of this study confirm Cook-Mozaffari et al.'s findings by mortality analysis for the group of installations involved in non-power producing nuclear technology. This study sheds no light on the possible basis for the association, which remains to be clarified. Initial steps have been taken by Gardner et al. using case-referent methods. (author). 15 refs., 3 figs., 7 tabs

  20. Offshore windfarm proposal to reduce costs of foundations and installations.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-09-04

    to incorporate any marine field work associated with the project into an existing Seacore commercial project. As part of the project, the Civil Engineering department of the University of Bristol was commissioned to perform a literature search of monopile design and installation methodologies with comments on the expected effect of the installation method on in-situ performance, optimisation of monopile design procedures and geotechnical site investigation and soil testing methodologies. Furthermore they were asked to identify, based on their literature findings, the most promising 'optimal' installation method for large diameter monopiles.(Author)

  1. Topo-Iberia GPS network: installation complete

    Science.gov (United States)

    Khazaradze, G.

    2009-04-01

    As part of the project, titled "Geociencias en Iberia: Estudios integrados de topografía y evolución 4D: Topo-Iberia", we have established a network of 26 continuous GPS stations, covering the Spanish part of the Iberian Peninsula (22 stations) and Morocco (4 stations). A major objective behind the establishment of this array is to monitor millimeter level deformation of the crust due to the collision of African and Eurasian (including Iberian) tectonic plates. More specific goals of the project include the identification of the areas and/or specific seismic faults which exhibit higher deformation rates, which could imply an increased seismic hazard in these specific areas. The network has been designed as two X-shaped transects crossing the peninsula from NE to SW and NW to SE, with relatively coarse distribution of the stations, superimposed with denser coverage in the seismically active areas of the Betics, Pyrenees and Cantabrian chains. The majority of the built monuments consist of 1.5-1.8 m tall concrete pillars of 40 cm in diameter anchored to the bedrock using iron rebars. One station in Huesca was built according the UNAVCO's short drilled braced monument (SDBM) specifications. All the monuments were equipped with the SCIGN leveling mounts to ensure the precise antenna alignment and re-alignment in case of the antenna replacement, as well as, tamper resistance of the monument mark. In places were the snow accumulation was possible the antennas were covered with plastic radomes. The instrumentation used is Trimble NetRS dual-frequency receivers with choke-ring antennas. The communication is mainly via cellular telephone system. As of December 2008, the network installation has been competed and all the stations are fully operational. Here we report the milestones of the installation of the network and, as well as, present the first preliminary results of the analysis of the data. Besides the newly established Topo-Iberia CGPS stations, we have included

  2. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  3. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  4. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  5. Using game engines in mixed reality installations

    NARCIS (Netherlands)

    Nakevska, M.; Vos, E.C.; Juarez, Alex; Hu, J.; Langereis, G.R.; Rauterberg, G.W.M.; Anacleto, J.; Fels, S.; Graham, N.; et al., xx

    2011-01-01

    In a mixed reality installation, a variety of technologies is integrated such as virtual reality, augmented reality, and animated virtual agents and robotic agents. One of the main challenges is how to design and implement a mixed reality installation that integrates a heterogeneous array of sensors

  6. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  7. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  8. Public perception of nuclear installations

    International Nuclear Information System (INIS)

    Kiipper, Felipe de Moura

    2011-01-01

    The key for nuclear renaissance is public acceptance. Facing energetic needs that occur around the world and lack of resources, the work of characterizing and proposing new models to represent public opinion is extremely important to all stakeholders. Even though public opinion's study on risks is relatively recent, may approaches of this subject have been suggested and presented, especially for the topic of perceptions on nuclear installations. Actual definitions on risk exist between objective and subjective models, that reflect opinions of lay public and experts. Strategies on communications with the public may be evaluated from many developed models, and its results may be registered. The use of structural models may present an exploratory character as well as confirmatory theories, as an adequate tool for the development of studies on public perception. In this work, a structural model is presented from data obtained in a previous report, and added to data collected before and after the Fukushima nuclear accident, in Japan. The effects developed from this accident offered a unique opportunity to study public opinion through the effects of a serious nuclear accident and its effects on risk communications. Aside, this work attempted to check the structural model according with obtained results, in order to sustain a constant improvement of the working tools. Yet, a comparison between data according to experts' respondents and lay public ones as well as a comparison among different students before and after a visit to nuclear station is considered. Obtained data for the structural models has been applied for on a structural model and analyzed by structural correlation matrix, latent variable structural coefficients and R 2 values. Results indicate that public opinion maintains its rejection on nuclear energy and the perception of benefits, facing perceived risks before the accident, has diminished. A new model that included a latent variable for corresponding

  9. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  10. Conflict management in the planning of nuclear installations

    International Nuclear Information System (INIS)

    Pfeifer, M.

    1989-01-01

    Subsequent to the decision of the Bavarian Higher Administrative Court, which after judicial review declared the development plan for the Wackersdorf site and the reprocessing facility there to be void, the author analyses the situation with regard to the tasks to be accomplished by an installation-specific planning management for coping with arising conflicts - and nuclear hazards in particular -, and for coming to a reconciliation of interests. The author agrees with the decision of the Lueneburg Higher Administrative Court which stated that, in view of the subsequent licensing procedure provided by the law, the development plans need not specify any regulations concerning the specific nuclear hazards or radiological consequences of installations of this type, so that development plans within the meaning of sec. 1, sub-sec. (3) BauGB do not necessarily have to consider nuclear risks or dose limits. (orig./HP) [de

  11. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  12. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  13. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  14. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  15. Regulatory requirements and administrative practice in safety of nuclear installations

    International Nuclear Information System (INIS)

    Servant, J.

    1977-01-01

    This paper reviews the current situation of the France regulatory rules and procedures dealing with the safety of the main nuclear facilities and, more broadly, the nuclear security. First, the author outlines the policy of the French administration which requires that the licensee responsible for an installation has to demonstrate that all possible measures are taken to ensure a sufficient level of safety, from the early stage of the project to the end of the operation of the plant. Thus, the administration performs the assessment on a case-by-case basis, of the safety of each installation before granting a nuclear license. On the other hand, the administration settles overall safety requirements for specific categories of installations or components, which determine the ultimate safety performances, but avoid, as far as possible, to detail the technical specifications to be applied in order to comply with these goals. This approach, which allows the designers and the licensees to rely upon sound codes and standards, gains the advantage of a great flexibility without imparing the nuclear safety. The author outlines the licensing progress for the main categories of installations: nuclear power plants of the PWR type, fast breeders, uranium isotope separation plants, and irradiated fuel processing plants. Emphasis is placed on the most noteworthy points: standardization of projects, specific risks of each site, problems of advanced type reactors, etc... The development of the technical regulations is presented with emphasis on the importance of an internationally concerned action within the nuclear international community. The second part of this paper describes the France operating experience of nuclear installations from the safety point of view. Especially, the author examines the technical and administrative utilization of data from safety significant incidents in reactors and plants, and the results of the control performed by the nuclear installations

  16. Regulatory Safety Requirements for Operating Nuclear Installations

    International Nuclear Information System (INIS)

    Gubela, W.

    2017-01-01

    The National Nuclear Regulator (NNR) is established in terms of the National Nuclear Regulator Act (Act No 47 of 1999) and its mandate and authority are conferred through sections 5 and 7 of this Act, setting out the NNR's objectives and functions, which include exercising regulatory control over siting, design, construction etc of nuclear installations through the granting of nuclear authorisations. The NNR's responsibilities embrace all those actions aimed at providing the public with confidence and assurance that the risks arising from the production of nuclear energy remain within acceptable safety limits -> Therefore: Set fundamental safety standards, conducting pro-active safety assessments, determining licence conditions and obtaining assurance of compliance. The promotional aspects of nuclear activities in South Africa are legislated by the Nuclear Energy Act (Act No 46 of 1999). The NNR approach to regulations of nuclear safety and security take into consideration, amongst others, the potential hazards associated with the facility or activity, safety related programmes, the importance of the authorisation holder's safety related processes as well as the need to exercise regulatory control over the technical aspects such as of the design and operation of a nuclear facility in ensuring nuclear safety and security. South Africa does not have national nuclear industry codes and standards. The NNR is therefore non-prescriptive as it comes to the use of industry codes and standards. Regulatory framework (current) provide for the protection of persons, property, and environment against nuclear damage, through Licensing Process: Safety standards; Safety assessment; Authorisation and conditions of authorisation; Public participation process; Compliance assurance; Enforcement

  17. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  18. Argonne National Laboratory's photo-oxidation organic mixed waste treatment system - installation and startup testing

    International Nuclear Information System (INIS)

    Shearer, T.L.; Nelson, R.A.; Torres, T.; Conner, C.; Wygmans, D.

    1997-01-01

    This paper describes the installation and startup testing of the Argonne National Laboratory (ANL-E) Photo-Oxidation Organic Mixed Waste Treatment System. This system will treat organic mixed (i.e., radioactive and hazardous) waste by oxidizing the organics to carbon dioxide and inorganic salts in an aqueous media. The residue will be treated in the existing radwaste evaporators. The system is installed in the Waste Management Facility at the ANL-E site in Argonne, Illinois. 1 fig

  19. Interpretation of the concepts of ALARA and bat for radioactive effluent releases from nuclear installation

    International Nuclear Information System (INIS)

    Chen Xiaoqiu

    2009-01-01

    Based on the understanding of the important concepts of both ALARA and BAT associated with the characteristics of effluent releases from the existing nuclear installations and the abatement techniques for effluents, this paper elaborates the principle of controlling radioactive effluent concentration from nuclear installation, that is based on the BAT focusing on the abatement techniques for effluents, introduces the good practice in the projects, and optimize the effluent releases with account taken of external factors such as the site condition. (authors)

  20. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  1. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  2. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  3. Wind-power installation on the Guetsch in Switzerland; Windkraftanlage Guetsch, EW Ursern, Andermatt UR

    Energy Technology Data Exchange (ETDEWEB)

    Russi, M.

    2006-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 800 kW wind turbine installed in 2001/2002 by the Ursern electricity utility near Andermatt, Switzerland, at a height of 2350 meters above sea level. The original prototype wind turbine contained various components from Swiss industry, such as the generator and the inverter. Because of difficulties (cracks in rotor blades, bankruptcy of the manufacturer, etc.) this installation was replaced by an Enercon 600-kW-wind turbine in 2004. Characteristic features of this turbine, such as is its adaptation for use under turbulent wind conditions at cold locations, are discussed. The results obtained in 2005 made it obvious that the utilisation of wind energy in alpine regions is possible and that the extreme conditions at this location do not significantly affect the efficient and safe operation of such an installation. Together with the presence of a meteorological station in the vicinity, optimal operating conditions prevail at this site for further research projects in connection with icing-up of turbine blades and wind energy. The report describes the installation and de-installation of the first turbine and the installation of the present one. Initial experience gained with the installation and its certification by the 'Naturemade' eco-power programme is discussed, as is future expansion at the site.

  4. Chapter 7: Renewable Energy Options and Considerations for Net Zero Installations

    Energy Technology Data Exchange (ETDEWEB)

    Booth, Samuel

    2017-03-15

    This chapter focuses on renewable energy options for military installations. It discusses typical renewable technologies, project development, and gives examples. Renewable energy can be combined with conventional energy sources to provide part or all of the energy demand at an installation. The appropriate technology mix for an installation will depend on site-specific factors such as renewable resources, energy costs, local energy policies and incentives, available land, mission compatibility, and other factors. The objective of this chapter is to provide basic background information and resources on renewable energy options for NATO leaders and energy personnel.

  5. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  6. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  7. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  8. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  9. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  10. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    International Nuclear Information System (INIS)

    Robinson, Sharon M.; Jubin, Robert Thomas; Patton, Bradley D.; Sullivan, Nicholas M.; Bugbee, Kathy P.

    2009-01-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D and D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in

  11. Practical decommissioning experience with nuclear installations in the European Community

    International Nuclear Information System (INIS)

    Skupinski, E.

    1992-01-01

    Initiated by the Commission of the European Communities (CEC), this seminar was jointly organized by the AEA, BNFL and the CEC at Windermere and the sites of Windscale/Sellafield, where the former Windscale advanced gas-cooled reactor and the Windscale piles are currently being dismantled. The meeting aimed at gathering a limited number of European experts for the presentation and discussion of operations, results and conclusions on techniques and procedures currently applied in the dismantling of large scale nuclear installations in the European Community

  12. RF accelerating unit installed in the PSB

    CERN Multimedia

    CERN PhotoLab

    1972-01-01

    RF accelerating unit installed in the PSB ring between two bending magnets. Cool air from a heat exchanger is injected into the four cavities from the central feeder and the hot air recirculated via the lateral ducts.

  13. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  14. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  15. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  16. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  17. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  18. Radioelement gauges. Appliances intended for permanent installation

    International Nuclear Information System (INIS)

    1975-08-01

    The present norm defines for radioelement gauges intended for permanent installation: a classification of instruments and beam shutter devices; recommended construction techniques which satisfy health physics requirements; monitoring and test methods; information which must appear on the instruments [fr

  19. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  20. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  1. Requirements of on-site facilities

    International Nuclear Information System (INIS)

    Burchardt, H.

    1977-01-01

    1) Requirements of on-site facilities: a) brief description of supplying the site with electricity and water; communication facilities, b) necessary facilities for containment and pipeline installation, c) necessary facilities for storage, safety, accommodation of personnel, housing; workshops; 2) Site management: a) Organisation schedules for 'turn-key-jobs' and 'single commission', b) Duties of the supervisory staff. (orig.) [de

  2. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  3. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  4. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  5. Influence of matrix attachment installation load on movement and resultant forces in implant overdentures.

    Science.gov (United States)

    Goto, Takaharu; Nagao, Kan; Ishida, Yuichi; Tomotake, Yoritoki; Ichikawa, Tetsuo

    2015-02-01

    This in vitro study investigated the effect of attachment installation conditions on the load transfer and denture movements of implant overdentures, and aims to clarify the differences among the three types of attachments, namely ball, Locator, and magnet attachments. Three types of attachments, namely ball, Locator, and magnetic attachments were used. An acrylic resin mandibular edentulous model with two implants placed in the bilateral canine regions and removable overdenture were prepared. The two implants and bilateral molar ridges were connected to three-axis load-cell transducers, and a universal testing machine was used to apply a 50 N vertical force to each site of the occlusal table in the first molar region. The denture movement was measured using a G(2) motion sensor. Three installation conditions, namely, the application of 0, 50, and 100 N loads were used to install each attachment on the denture base. The load transfer and denture movement were then evaluated. The resultant force decreased with increasing installation load for all attachments. In particular, the resultant force on implants on the loading side of the Locator attachment significantly decreased when the installation load was increased from 0 to 50 N, and that for magnetic attachment significantly decreased when the installation load was increased from 50 to 100 N. For the residual ridges on the loading side, the direction of the forces for all attachments changed to downward with increasing installation load. Furthermore, the yaw Euler angle increased with increasing installation load for the magnetic attachment. Subject to the limitations of this study, the use of any installation load greater than 0 N is recommended for the installation of ball and Locator attachments on a denture base. Regarding magnetic attachments, our results also recommend installation on a denture base using any installation load greater than 0 N, and suggest that the resultant force acting on the implant can be

  6. Renewable Energy, Authenticity, and Tourism: Social Acceptance of Photovoltaic Installations in a Swiss Alpine Region

    Directory of Open Access Journals (Sweden)

    Annina Helena Michel

    2015-05-01

    Full Text Available With the increasing emergence of renewable energy sites in Switzerland, new impacts on the landscape can be observed. Above the Alpine village of Bellwald, a pilot project testing avalanche barriers as a possible site for photovoltaic installations was inaugurated in 2012. This study focused on social aspects of the project and asked questions about local residents' and tourists' perceptions of and attitudes toward the installations. Its findings reveal that the new elements are not perceived as a drastic intrusion into the landscape, because the view was already affected by the avalanche barriers, which are accepted because of their vital protective function. No significant difference was found between residents' and tourists' evaluation of the new photovoltaic installations. However, different factors influenced the perceptions of these 2 groups. In both groups, conceptions related to place played an important role in the evaluation of possible photovoltaic sites.

  7. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  8. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  10. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations

    International Nuclear Information System (INIS)

    Lacour, J.

    1964-01-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [fr

  11. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  12. Information handbook on independent spent fuel storage installations

    International Nuclear Information System (INIS)

    Raddatz, M.G.; Waters, M.D.

    1996-12-01

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996

  13. Practical decommissioning experience with nuclear installations in the European Community

    International Nuclear Information System (INIS)

    Skupinski, E.

    1993-01-01

    Initiated by the Commission of the European Communities (CEC), this seminar was jointly organized by Kernkraftwerke RWE Bayernwerk GmbH (KRB) and the CEC at Gundremmingen-Guenzburg (D), where the former KRB-A BWR is presently being dismantled. The meeting aimed at gathering a limited number of European experts for the presentation and discussion of operations, the results and conclusions on techniques and procedures presently applied in the dismantling of large-scale nuclear installations in the European Community. Besides the four pilot dismantling projects of the presently running third R and D programme (1989-93) of the European Community on decommissioning of nuclear installations (WAGR, BR-3 PWR, KRB-A BWR and AT-1 FBR fuel reprocessing), the organizers selected the presentation of topics on the following facilities which have a significant scale and/or representative features and are presently being dismantled: the Magnox reprocessing pilot plant at Sellafield, the HWGCR EL4 at Monts d'Arree, the operation of an on-site melting furnace for G2/G3 GCR dismantling waste at Marcoule, an EdF confinement conception of shut-down LWRs for deferred dismantling, and the technical aspects of the Greifswald WWER type NPPs decommissioning. This was completed by a presentation on the decommissioning of material testing reactors in the United Kingdom and by an overview on the conception and implementation of two EC databases on tools, costs and job doses. The seminar concluded with a guided visit of the KRB-A dismantling site. This meeting was attended by managers concerned by the decommissioning of nuclear installations within the European Community, either by practical dismantling work or by decision-making functions. Thereby, the organizers expect to have contributed to the achievement of decommissioning tasks under optimal conditions - with respect to safety and economics - by making available a complete and updated insight into on-going dismantling projects and by

  14. Taking into account chemical safety for French basic nuclear installations

    International Nuclear Information System (INIS)

    Tabard, Laurence; Conte, Dorothee

    2013-01-01

    Among nuclear installations, some fuel cycle facilities present a high level of chemical hazards. In France, the TSN law of the 13 June 2006 requires taking into account all the risks generated by a basic nuclear installation (BNI). But, as most of the implementing regulatory texts are under development at this time, part of the previous regulation settled down in the 1990's is still applying: the order of the 31 December 1999 concerning technical regulation in order to prevent and to limit hazards generated by nuclear facilities; the decree of the 4 May 1995 and the order of the 26 November 1999 that deal with BNI discharges. Moreover, some parts of BNI or of nuclear sites can be submitted to the general regulation concerning chemical hazards, which is part of the environment code. As a result, even if the TSN law and its implementing decree Nr 2007-1557 of the 2 November 2007 settle clearly that safety of BNI is not only radiological, but must take into account chemical hazards, the latter aspects are still under development. Moreover the application of the existing regulation, even if complex, has helped to assess chemical risks inside BNI and nuclear sites. (authors)

  15. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  16. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  17. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  18. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  19. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  20. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  1. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  2. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  3. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  4. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  5. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  6. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  7. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  8. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  9. Questions for the nuclear installations inspectorate

    International Nuclear Information System (INIS)

    Conroy, C.; Flood, M.; MacRory, R.; Patterson, W.C.

    1976-01-01

    The responsibilities of the Nuclear Installations Inspectorate are considered, and the responsibilities of other bodies for (a) reprocessing and enrichment, and (b) security. Questions for the Nuclear Installations Inspectorate are then set out under the following heads: general (on such topics as vandalism, sabotage, threats, security, reactor incidents); magnox reactors; corrosion; advanced gas-cooled reactor; steam generating heavy water reactor; fast breeder reactor; reproces-sing and waste. Most of the questions are concerned with technical problems that have been reported or might possibly arise during construction or operation, affecting the safety of the reactor or process. (U.K.)

  10. Managing for safety at nuclear installations

    International Nuclear Information System (INIS)

    1996-01-01

    This publication, by the Health and Safety Executive's (HSE's) Nuclear Safety Division (NSD), provides a statement of the criteria the Nuclear Installations Inspectorate (NII) uses to judge the adequacy of any proposed or existing system for managing a nuclear installation in so far as it affects safety. These criteria have been developed from the basic HSE model, described in the publication Successful health and safety management that applies to industry generally, in order to meet the additional needs for managing nuclear safety. In addition, the publication identifies earlier studies upon which this work was based together with the key management activities and outputs. (Author)

  11. Measurements of image characteristics of DSA installations

    International Nuclear Information System (INIS)

    Busch, H.P.; Strauss, L.G.; Freimarck, R.D.

    1984-01-01

    Measurements for quantifying the image characteristics were carried out on three DSA installations (DVI 1 - Philips, Angiotron - Siemens and DF 3000 - General Eletric). Contrast resolution was measured with a vessel phantom (General Electric) and spatial resolution with a lead grid. A further parameter was the dose entering the image intensifier. The Angiotron was used with an intensifier with 53 cm. diameter and the DF 3000 with temporal subtraction of the video images and the subtraction of dual energy images (hybrid technique). These measurements can be carried out quickly and easily and are a step towards standardisation of measurements of image characteristics of DSA installations. (orig.) [de

  12. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  13. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  14. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2002 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2002. There are two installations mentioned in the statement: Dungeness B and Heysham 1. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  15. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  16. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  17. Siting and public acceptance

    International Nuclear Information System (INIS)

    De Lise, Pasquale.

    1977-01-01

    The paper discusses the problem of nuclear power plant siting according to presently applicable legislation in Italy, taking into account urban and environmental aspects. Act No 393 of 2 August 1975 on the siting of nuclear plants introduced a significant change in that prior to its adoption, the competence to license nuclear installations was divided amongst so many bodies that approval was inevitably delayed. Act No. 393 lays down the siting procedure which involves authorities at regional and State level and provides a step by step consultation of the Communes concerned and gives them a time limit for replying to the proposed project, while enabling the necessary scientific, environmental and urban investigations to be made. Thus although ultimate decisions rest with the State, the regional bodies representing the public have a voice in them. In such planning the authorities must take into account the public interest, from the environmental and social angles as well as political and economic interests. (NEA) [fr

  18. Emergency plans for civil nuclear installations in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1984-01-01

    The operators of nuclear installations in the United Kingdom have plans to deal with accidents or emergencies at their nuclear sites. These plans provide for any necessary action, both on and off the nuclear site, to protect members of the public and are regularly exercised. The off-site actions involve the emergency services and other authorities which may be called upon to implement measures to protect the public in any civil emergency. In a recent review of these plans by Government Departments and agencies and the nuclear site operators, a number of possible improvements were identified. These improvements are concerned mainly with the provisions made for liaison with local and national authorities and for public information and have been incorporated into existing plans. An outline is given of the most likely consequences of an accidental release of radioactive material and the scope of emergency plans. Details are also provided on the responsibilities and functions of the operator and other organizations with duties under the plans and the arrangements made for public information. (author)

  19. Comparison of revegetation of a gas pipeline right-of-way in two forested wetland crossings involving conventional methods of pipeline installation and horizontal drilling, Nassau County, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology; Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1993-10-01

    One year after pipeline installation, vegetation in the right-of-way (ROW) was inventoried at two stream floodplain crossings in Nassau County, Florida. Both sites were forested wetlands composed of Acer rubrum, Fraxinus caroliniana, Liquidamber styraciflua, Nyssa ogecho, Quercus laurifolia, and Taxodium distichum, together with other wetland trees. Pipeline installation across the Brandy Branch floodplain was by conventional ditching and backfill methods. Installation across the Deep Creek floodplain was by horizontal drilling after clearcutting the ROW. The latter method left tree stumps, understory vegetation, and soil layers intact, except for disruptions caused by logging. According to the inventory, vegetation at the drilled site was more diverse (nearly twice as many species occurring in the ROW as at the trenched site) and more robust (no unvegetated exposed soil compared to 15% at the trenched site). Differences between the ROW vegetation at the two sites can be attributed to both site differences and installation technologies used.

  20. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  1. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    of the installation using tools like sketching or storyboarding. The design involves a clarification of available and appropriate building blocks, as well as the linking of these blocks to provide an architectural framework comprising the intended external behavior. The construction phase takes a component...

  2. Solar Energy Installers Curriculum Guides. Final Report.

    Science.gov (United States)

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  3. Geodetic alignment of laser power installations

    International Nuclear Information System (INIS)

    Shtorm, V.V.; Gostev, A.M.; Drobikov, A.V.

    1989-01-01

    Main problems occuring in applied geodesy under initial alignment of laser power installation optical channel are considered. Attention is paid to alignment of lens beamguide telescopic pairs and alignment quality control. Methods and means of geodetic measurements under alignment are indicated. Conclusions are made about the degree of working through certain aspects of the problem

  4. Installation of the ALICE dipole magnet

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The large dipole magnet is installed on the ALICE detector at CERN. This magnet, which is cooled by demineralised water, will bend the path of muons that leave the huge rectangular solenoid (in the background). These muons are heavy electrons that interact less with matter, allowing them to traverse the main section of the detector.

  5. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  6. Door Hardware and Installations; Carpentry: 901894.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  7. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  8. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  9. Participatory ergonomics applied in installation work

    NARCIS (Netherlands)

    Jong, A.M. de; Vink, P.

    2002-01-01

    This paper evaluates a step-by-step participatory approach to better work, applied in reducing the musculoskeletal workload in installation work. To arrive at a reduction in workload, a steering group led the project through the following steps: Introduction: defining the goal and informing all 7000

  10. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  11. Radionuclides gauges. Gauges designed for permanent installation

    International Nuclear Information System (INIS)

    1987-06-01

    This present norm determines, for radionuclides gauges designed for permanent installation, the characteristics that these gauges should satisfied in their construction and performance to respect the prescriptions. It indicates the testing methods which permit to verify the agreement, gives a classification of gauges and specifies the indications to put on the emitter block [fr

  12. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  13. Installation package - SIMS prototype system 1A

    Science.gov (United States)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  14. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  15. Installation in Outdoor Advertising Designs: Engagement with ...

    African Journals Online (AJOL)

    The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader). If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

  16. Decommissioning and abandonment of offshore installations

    International Nuclear Information System (INIS)

    Side, J.C.

    1992-01-01

    To the onlooker surprising little thought was given at the project planning stage to the fate of offshore facilities once their production lifetimes had come to an end. Throughout the 1970s at least, international law required the complete removal of all structures and installations one disused or abandoned. Fishermen's organisations were led to believe that such installations would be entirely removed yet many of the designs of these show that removal was not much in the minds of the engineers or project management during the design stages. Changes in the text of the United Nations' Convention on the Law of the Sea and (by their widespread legal adoption) in customary international law may now permit partial removal of installations subject to important safeguards for navigation, the environment and other users of the sea. Of the North Sea states at least one has adopted policies that will minimise the cost associated with offshore decommissioning and abandonment and both the UK and Norway are adopting legislation which will provide for a case by case approach to the decommissioning and abandonment of offshore facilities and allow partial removal options. There has thus been a recent and significant change in approach to the abandonment of offshore oil and gas installations. This chapter reviews the development of abandonment laws and policies, outlines the available removal options, and provides a consideration of the environmental and fishery implications of these for the North Sea. (Author)

  17. 40 CFR 1060.130 - What installation instructions must I give to equipment manufacturers?

    Science.gov (United States)

    2010-07-01

    ... specify the requirements for the fuel cap, such as the allowable materials, thread pattern, how it must... liquid fuel. (4) Describe instructions for installing components so they will operate according to design... equivalent format. For example, you may post instructions on a publicly available Web site for downloading or...

  18. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Science.gov (United States)

    2010-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads...

  19. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... HAP emissions, you must install a non-resettable hour meter prior to the startup of the engine. (e) If you own or operate an existing stationary RICE with a site rating of less than 100 brake HP located at... stationary engine, you must minimize the engine's time spent at idle during startup and minimize the engine's...

  20. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... continuous operation according to the site-specific monitoring plan. (e) For each venturi scrubber applied to... across the scrubber and scrubber water flow rate during each push according to the requirements in... all recorded readings. (f) For each hot water scrubber applied to pushing emissions, you must install...

  1. Solar heating and domestic hot water system installed at North Dallas High School

    Science.gov (United States)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  2. Statement of nuclear incidents: statement of incidents at nuclear installations: third quarter 1990

    International Nuclear Information System (INIS)

    1990-01-01

    A summary of nuclear incidents occuring at nuclear installations in Britain between 1st July 1990 and 30th September 1990 is presented here, as published by the Health and Safety Executive, two occurring at Harwell Laboratory and one at Winfrith. None of the incidents caused danger to the public, and doses to site workers were not significant. (UK)

  3. Measurement of chimney dimensions and development of special tools for installation of in-chimney bracket in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong Garp; Ryu, J. S.; Lee, J. H.; Lee, Y. S; Lee, B. H.

    2000-06-01

    The in-chimney bracket is a structure which supports the guide tubes of irradiation facilities at the irradiation sites of CT, IR1, IR2, OR4 and/or OR5 in HANARO core to reduce the flow-induced vibration and the dynamic response to seismic load. It horizontally supports the middle part of lthe irradiation facilities for CT/IR sites in addition to the robot arms which had already been installed at the reactor pool liner to support the top of the facilities, and supports the top of the guide tubes for OR sites. For these purposes, the in-chimney bracket was installed in the chimney using four siphoning holes located at 70 cm below the chimney top. It is necessary to measure the dimensions of chimney before the design of in-chimney bracket because there must be manufacturing tolerances and the deformation of the chimney due to the load of the system pipes. To implement this, various special tools had been developed to measure the as-built dimensions of the chimney at the elevation of the siphoning holes, and measured the chimney dimensions and the eccentricity of the chimney center from the reactor core center. Also, a special tool was developed for the installation of the in-chimney bracket by remote operating at the pool top 10 meters apart from the chimney. The installation procedures were established through the enough installation rehearsal using the installation tool and the dummhy chimney which was fabricated to the same dimensions of the real chimney, and the installation interference problems were resolved through the preliminaly installation to the reactor chimney. Finally, the in-chimey bracket was successfully installed at the reactor chimney and is well being used for the irradiation test since the installation on May 16, 2000

  4. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  5. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  6. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  7. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  8. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  9. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  10. Dealing with risk of fixed installations in The Netherlands

    Science.gov (United States)

    Ale, B. J. M.

    In a densely populated and highly industrialized country such as The Netherlands, the competent authorities face the problem of making sure that, on the one hand, the chemical industry can develop and, on the other, the population is not subjected to undue risk or nuisance. Cryogenic storage facilities are treated just as other industrial facilities would be in this respect. While up to the early 1970s such planning was done on the basis of qualitative insight into the hazards of chemical plants, since then it has been recognized that global insight and engineering judgement alone no longer form a solid enough basis on which to rest safety decisions, such as changes to an installation, siting and zoning. From the mid-1970s the Directorate General for the Environment in The Netherlands has been developing tools to support decision makers with quantified information about risks. The development of these techniques has been a complicated task in which the Directorate worked together with engineering companies and the research institutions of the EEC. The development of more accurate tools is a continuing process. The application of decision support techniques to areas other than the immediate risks to life, such as carcinogenic effects and ecological damage, may need even more work to develop suitable techniques. The Directorate General for the Environment has also developed preliminary guidelines for the acceptability of risk. The application of quantitative techniques to support decisions with respect to potentially hazardous chemical installations has been accepted by Parliament. Since the introduction of the Major Hazards Regulation more than 50 external safety reports, describing the risks of major chemical complexes, have been produced. These reports give an interesting insight into the risks of these types of installations and the necessary safety zones around them. They also give an indication to what sort of information can be used successfully by the

  11. Professional installation of overvoltage protection devices. The most common installation errors; Fachgerechte Installation von Ueberspannungsschutzgeraeten. Die haeufigsten Installationsfehler

    Energy Technology Data Exchange (ETDEWEB)

    Gmelch, L. [Dehn und Soehne GmbH und Co. KG, Neumarkt (Germany)

    2007-07-01

    Increasingly sensitive electronic equipment and high demands on plant and system availability necesstate effective protection against lightning and overvoltage. Apart from the measures that must be taken already in the projecting phase in order to minimize the risk of interferences, disturbances and destruction of plants and systems, there are also some basic principles that must be observed when installing overvoltage protection equipment. If these are neglected, the protective function of overvoltage protection systems may be seriously impaired. (orig.)

  12. Siting of research reactors

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this document is to develop criteria for siting and the site-related design basis for research reactors. The concepts presented in this document are intended as recommendations for new reactors and are not suggested for backfitting purposes for facilities already in existence. In siting research reactors serious consideration is given to minimizing the effects of the site on the reactor and the reactor on the site and the potential impact of the reactor on the environment. In this document guidance is first provided on the evaluation of the radiological impact of the installation under normal reactor operation and accident conditions. A classification of research reactors in groups is then proposed, together with a different approach for each group, to take into account the relevant safety problems associated with facilities of different characteristics. Guidance is also provided for both extreme natural events and for man-induced external events which could affect the safe operation of the reactor. Extreme natural events include earthquakes, flooding for river or coastal sites and extreme meteorological phenomena. The feasibility of emergency planning is finally considered for each group of reactors

  13. A statistical evaluation of formation disturbance produced by well- casing installation methods

    Science.gov (United States)

    Morin, R.H.; LeBlanc, D.R.; Teasdale, W.E.

    1988-01-01

    Water-resources investigations concerned with contaminant transport through aquifers comprised of very loose, unconsolidated sediments have shown that small-scale variations in aquifer characteristics can significantly affect solute transport and dispersion. Commonly, measurement accuracy and resolution have been limited by a borehole environment consisting of an annulus of disturbed sediments produced by the casing-installation method. In an attempt to quantify this disturbance and recognize its impact on the characterization of unconsolidated deposits, three installation methods were examined and compared in a sand-and-gravel outwash at a test site on Cape Cod, Massachusetts. These installation methods were: 1) casing installed in a mud-rotary hole; 2) casing installed in an augered hole; and 3) flush-joint steel casing hammer-driven from land surface. Fifteen wells were logged with epithermal neutron and natural gamma tools. Concludes that augering is the most disruptive of the three casing-installation methods and that driving casing directly, though typically a more time-consuming operation, transmits the least amount of disturbance into the surrounding formation. -from Authors

  14. The installation of a multiport ground-water sampling system in the 300 Area

    International Nuclear Information System (INIS)

    Gilmore, T.J.

    1989-06-01

    In 1988, the Pacific Northwest Laboratory installed a multiport groundwater sampling system in well 399-1-20, drilled north of the 300 Area on the Hanford Site in southwestern Washington State. The purpose of installing the multiport system is to evaluate methods of determining the vertical distribution of contaminants and hydraulic heads in ground water. Well 399-1-20 is adjacent to a cluster of four Resource Conservation and Recovery Act (RCRA) ground-water monitoring wells. This proximity makes it possible to compare sampling intervals and head measurements between the multiport system and the RCRA monitoring wells. Drilling and installation of the multiport system took 42 working days. Six sampling ports were installed in the upper unconfined aquifer at depths of approximately 120, 103, 86, 74, 56, and 44 feet. The locations of the sampling ports were determined by the hydrogeology of the area and the screened intervals of adjacent ground-water monitoring wells. The system was installed by backfilling sand around the sampling ports and isolating the ports with bentonite seals. The method proved adequate. For future installation, however, development and evaluation of an alternative method is recommended. In the alternative method suggested, the multiport system would be placed inside a cased and screened well, using packers to isolate the sampling zones. 4 refs., 8 figs., 1 tab

  15. First experience with the installation of passive autocatalytic recombiners

    International Nuclear Information System (INIS)

    Snoeck, J.; Solaro, C.; Moeyaert, P.

    1997-01-01

    From the principle decision of installing Passive Autocatalytic Recombiners (PARs) in all Belgian NPPs to the installation on site, several problems needed to be identified and solved; it is the goal of this paper to address these issues and to present the solutions which were adopted. The first section deals with the sizing and the distribution of the catalytic surface inside the containment to be equipped. Rather than to rely on numerous multicompartment calculations, the procedure is based on a single volume approach combined with engineering judgement. The criteria applied in the successive design steps are explained and illustrated for the Doel1 unit. The second section is devoted to additional requirements concerning the resistance to poisoning agents and the maintenance constraints, and to some recommendations for the design of the supports. Because the effectiveness of the PARs entirely relies on the catalyst material, a periodic control of the active parts is of primary importance. Therefore, the Transportable In-Service Inspection Equipment (TIIE) and the test procedures are presented in the third section. Finally, recommendations are made for further work, derived from this first experience. (author)

  16. Feasibility study on the transient fuel test loop installation

    International Nuclear Information System (INIS)

    Kim, J. Y.; Lee, C. Y.

    1997-02-01

    The design and installation of the irradiation test facility for verification test of the fuel performance are very important in connection with maximization of the utilization of HANARO. The objective of this study is to investigate and analyze the test capsules and loops in research reactors of the other countries and to design preliminarily the eligible transient fuel test facility to be installed in HANARO. The principle subjects of this study are to analyze the contents, kinds and scopes of the irradiation test facilities for nuclear technology development. The guidances for the basic and detail design of the transient fuel test facility in the future are presented. The investigation and analysis of various kinds of test facilities that are now in operation at the research reactors of nuclear advanced countries are carried out. Based on the design data of HANARO the design materials for an eligible transient fuel test facility comprises two pacts : namely, in pile test fuel in reactor core site, and out of pile system regulates the experimental conditions in the in pile test section. Especially for power ramping and cycling selection of the eligible power variation equipment in HANARO is carried out. (author). 13 refs., 4 tabs., 46 figs

  17. Hanford tank initiative test facility site selection study

    International Nuclear Information System (INIS)

    Staehr, T.W.

    1997-01-01

    The Hanford Tanks Initiative (HTI) project is developing equipment for the removal of hard heel waste from the Hanford Site underground single-shell waste storage tanks. The HTI equipment will initially be installed in the 241-C-106 tank where its operation will be demonstrated. This study evaluates existing Hanford Site facilities and other sites for functional testing of the HTI equipment before it is installed into the 241-C-106 tank

  18. Chapter 4. Assessment and inspection of nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    inspections: (1) Routine inspections performed mainly by site inspectors. They look whether the nuclear safety conditions and requirements are met. They also examine technical condition of nuclear equipment, performing surveillance testing of nuclear safety related equipment, observation of fulfilment of approved limits and conditions, selected operating procedures and programmes of quality assurance during construction and commissioning, operation and maintenance as well as in decommissioning nuclear installations. (2) Special inspections are focused on specific profession areas (such as fire safety, qualification and training of NPP personnel, etc.), especially on inspection of meeting specific requirements of nuclear safety. Team inspections are aimed at complex inspection of relevant nuclear equipment safety and they usually are being conducted simultaneously in several professional areas. The inspection of readiness of the nuclear installation for individual phases of commissioning is a typical example of a team inspection. This is the inspection of fulfilment of conditions imposed by UJD to the licensee to operate the nuclear power plant for issuing an approval to start up the unit after refuelling. Team inspections during operation are normally oriented to the areas, which are set based on long-term evaluation of results of nuclear installation's operator. (3) Extraordinary inspections are unplanned, evoked by unexpected operational events on nuclear installations, or the regulator responds by them to the situation in the organisation under supervision. In compliance with the 'Atomic Act' UJD performs inspections also during construction, reconstruction, repair and maintenance of nuclear installations in a form of participation of UJD inspectors at tests of selected equipment after its assembly is completed. The inspection activity of UJD has been performed by nuclear safety inspectors, the most of them having long-term experience in the relevant area. Inspectors

  19. Installation Capacity Assessment of Damaged Deepwater Pipelines

    Directory of Open Access Journals (Sweden)

    Ramasamy R.

    2014-07-01

    Full Text Available The worldwide exploration and development of subsea and deepwater reservoirs has laid down some new and old engineering challenges to the offshore pipeline industry. This requires large D/t pipelines to be installed at water depths in the vicinity of up to 2700m. The deepwater collapse and buckle propagation event is almost unavoidable as the pipe wall thickness cannot be always determined from the codes and standards due to the limit state criteria. These codes also do not consider any fabrication imperfections and sustained damages emanating from transportation and handling. The objective of this paper is to present the Finite Element Analysis (FEA of dented pipes with D/t ratio more than 45, which is outside the applicability of current design codes, and to investigate the effects on installation capacity of these various damage sizes in terms of collapse and buckle propagation.

  20. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  1. Software safety analysis application in installation phase

    International Nuclear Information System (INIS)

    Huang, H. W.; Yih, S.; Wang, L. H.; Liao, B. C.; Lin, J. M.; Kao, T. M.

    2010-01-01

    This work performed a software safety analysis (SSA) in the installation phase of the Lungmen nuclear power plant (LMNPP) in Taiwan, under the cooperation of INER and TPC. The US Nuclear Regulatory Commission (USNRC) requests licensee to perform software safety analysis (SSA) and software verification and validation (SV and V) in each phase of software development life cycle with Branch Technical Position (BTP) 7-14. In this work, 37 safety grade digital instrumentation and control (I and C) systems were analyzed by Failure Mode and Effects Analysis (FMEA), which is suggested by IEEE Standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The FMEA showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (authors)

  2. Software safety analysis practice in installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W.; Chen, M. H.; Shyu, S. S., E-mail: hwhwang@iner.gov.t [Institute of Nuclear Energy Research, No. 1000 Wenhua Road, Chiaan Village, Longtan Township, 32546 Taoyuan County, Taiwan (China)

    2010-10-15

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  3. Software safety analysis practice in installation phase

    International Nuclear Information System (INIS)

    Huang, H. W.; Chen, M. H.; Shyu, S. S.

    2010-10-01

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  4. Installation and validation of MCNP-4A

    International Nuclear Information System (INIS)

    Marks, N.A.

    1997-01-01

    MCNP-4A is a multi-purpose Monte Carlo program suitable for the modelling of neutron, photon, and electron transport problems. It is a particularly useful technique when studying systems containing irregular shapes. MCNP has been developed over the last 25 years by Los Alamos, and is distributed internationally via RSIC at Oak Ridge. This document describes the installation of MCNP-4A (henceforth referred to as MCNP) on the Silicon Graphics workstation (bluey.ansto.gov.au). A limited number of benchmarks pertaining to fast and thermal systems were performed to check the installation and validate the code. The results are compared to deterministic calculations performed using the AUS neutronics code system developed at ANSTO. (author)

  5. Drones and safety of nuclear installations

    International Nuclear Information System (INIS)

    Tourneur, Jean-Claude

    2015-01-01

    Recent flyovers of French nuclear power plants by drones or UAVs (the owners of these drones could not be identified) has made the safety of these nuclear installations a matter of concern. These events also raised the question of balance between secret and information about these installations. The French Parliamentary Office for the Assessment of Scientific and Technological Choices (OPECST) organised two sets of hearings, a confidential one with people in charge of information related to national defence and security, and a public one opened to all stakeholders. This article briefly reports and discusses the results of these hearings. It appeared that these flyovers are not really a threat, are more a communication action than anything else. Suggestions have been made for the development of researches in the field of drone detection, and also for evolutions of French legislation on drones

  6. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  7. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  8. Torsion instability of Dynamic Cables during Installation

    OpenAIRE

    Opgård, Marie Finstad

    2017-01-01

    The oil and gas industry today is a heavily regulated segment, and current standard hasestablished restrictions which yields a very limited weather window for offshore cable installations. This is due to experience with cable failure in harsh weather. A limiting factor in current practice is the design criterion for the minimum allowable radius of curvature in the touchdown point. In addition, current practice does not allow for occurrence of compression in the touch down zone...

  9. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  10. MICROCOSM - INSTALLATION OF THE LHC MODEL

    CERN Multimedia

    2002-01-01

    This week, installation of a 6m long section of the LHC starts in Microcosm. This full-scale model is the first part of a new exhibition highlighting the technological challenges and the exciting physics of the LHC era. Many people at CERN have helped with the preparations for the model and the Microcosm team would like to thank all those involved. An inauguration for the press will take place at the start of the next school term.

  11. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  12. Optimal installation program for reprocessing plants

    International Nuclear Information System (INIS)

    Kubokawa, Toshihiko; Kiyose, Ryohei

    1976-01-01

    Optimization of the program of installation of reprocessing plants is mathematically formulated as problem of mixed integer programming, which is numerically solved by the branch-and-bound method. A new concept of quasi-penalty is used to obviate the difficulties associated with dual degeneracy. The finiteness of the useful life of the plant is also taken into consideration. It is shown that an analogous formulation is possible for the cases in which the demand forecasts and expected plant lives cannot be predicted with certainty. The scale of the problem is found to have kN binary variables, (k+2)N continuous variables, and (k+3)N constraint conditions, where k is the number of intervals used in the piece-wise linear approximation of a nonlinear objective function, and N the overall duration of the period covered by the installation program. Calculations are made for N=24 yr and k=3, with the assumption that the plant life is 15 yr, the plant scale factor 0.5, and the maximum plant capacity 900 (t/yr). The results are calculated and discussed for four different demand forecasts. The difference of net profit between optimal and non-optimal installation programs is found to be in the range of 50 -- 100 M$. The pay-off matrix is calculated, and the optimal choice of action when the demand cannot be forecast with certainty is determined by applying Bayes' theory. The optimal installation program under such conditions of uncertainty is obtained also with a stochastic mixed integer programming model. (auth.)

  13. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  14. Installing Git under MacOS

    OpenAIRE

    Fitzpatrick, Benjamin

    2015-01-01

    Step by step guide to installing the version control software Git under the Macintosh Operating System MacOS X (and later). Includes a seqeunce of screenshots with hand drawn arrows ;-) These slides are part of the materials for an Introductory course on the R language and environment for statistial computing. Free and Open Source materials for this course hosted on GitHub: https://github.com/brfitzpatrick/Intro_to_R

  15. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2001-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2001 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2001. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  16. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  17. Assembly and Installation of the Daya Bay Antineutrino Detectors

    International Nuclear Information System (INIS)

    Band, H R; Heeger, K M; Hinrichs, P; Brown, R L; Gill, R; Carr, R; Dwyer, D A; Chen, X C; Chu, M C; Chen, X H; Heng, Y K; Cherwinka, J J; Greenler, L S; Draeger, E; Edwards, W R; Hoff, M; Goett, J; Gu, W Q; Ho, T H; He, W S

    2013-01-01

    The Daya Bay reactor antineutrino experiment is designed to make a precision measurement of the neutrino mixing angle θ 13 , and recently made the definitive discovery of its non-zero value. It utilizes a set of eight, functionally identical antineutrino detectors to measure the reactor flux and spectrum at baselines of ∼ 300–2000 m from the Daya Bay and Ling Ao Nuclear Power Plants. The Daya Bay antineutrino detectors were built in an above-ground facility and deployed side-by-side at three underground experimental sites near and far from the nuclear reactors. This configuration allows the experiment to make a precision measurement of reactor antineutrino disappearance over km-long baselines and reduces relative systematic uncertainties between detectors and nuclear reactors. This paper describes the assembly and installation of the Daya Bay antineutrino detectors

  18. Arrangements for dealing with emergencies at civil nuclear installations

    International Nuclear Information System (INIS)

    Turner, M.J.; Robinson, I.F.

    1989-01-01

    This paper covers arrangements for dealing with nuclear emergencies at sites licensed by the Health and Safety Executive/Nuclear Installations Inspectorate. Such arrangements are over and above the contingency plans required for radiation incidents as required by the Ionising Radiations Regulations. The statutory position of the NII is described and, although the NII is limited to regulating the activities of the operator, the functions of the other organisations that could be involved in dealing with an emergency are briefly covered in order to give as complete a picture as possible. The basis for emergency planning is given together with the consequences and countermeasures for mitigation of a nuclear emergency, including the use of ERLs. The requirements for emergency exercises are explained. (author)

  19. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  20. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  1. Act no 76-663 of 19 July 1976 on installations classified for the purposes of environmental protection

    International Nuclear Information System (INIS)

    1976-01-01

    This Act repeals the Act of 19 December 1917 on dangerous, noxious or insanitary establishments. Installations of all kinds, operated or owned by any person, whether natural or legal, public or private, are from now onwards governed by the provisions of the Act of 19 July 1976 if they may involve dangers or disadvantages for the amenities of the neighbour-hood, for public health, safety or hygiene, for agriculture, for the protection of nature and the environment, or for the preservation of sites and monuments. As was the case with the previous system, it is foreseen that large nuclear installations which have their own regulations and are defined in the Decree of 11 December 1963 will not appear in the nomenclature and will remain outside application of the legislation on classified installations. However, some nuclear installations are not large nuclear installations and a number of these were listed in the nomenclature of classified establishments drawn up under the 1917 Act. (NEA) [fr

  2. Update on Geothermal Direct-Use Installations in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Snyder, Diana M. [Georgia State University

    2017-02-15

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

  3. Numerical simulation of installation of skirt foundations

    Energy Technology Data Exchange (ETDEWEB)

    Vangelsten, Bjoern Vidar

    1997-12-31

    Skirt foundation has been increasingly used for permanent offshore oil installations and anchors for drilling ships. Suction is commonly used in skirt foundation installing. If a large amount of suction is applied, the soil around the foundation may fail and the foundation become useless. This thesis studies failure due to high seepage gradients, aiming to provide a basis for reducing the risk of such failures. Skirt penetration model testing has shown that to solve the problem one must understand what is going on at the skirt tip during suction installation. A numerical model based on micro mechanics was developed as continuum hypothesis was seen to be unsuitable to describe the processes in the critical phases of the failure. The numerical model combines two-dimensional elliptical particles with the finite difference method for flow to model water flow in a granular material. The key idea is to formulate the permeability as a function of the porosity of the grain assembly and so obtain an interaction between the finite difference method on flow and the particle movement. A computer program, DYNELL, was developed and used to simulate: (1) weight penetration of a skirt wall, (2) combined suction and weight penetration of a skirt wall, and (3) critical gradient tests around a skirt wall to study failure mechanisms. The model calculations agree well with laboratory experiments. 16 refs., 124 figs., 21 tabs.

  4. Design of the Los Alamos generator installation

    International Nuclear Information System (INIS)

    Boenig, H.J.; Schillig, J.B.; Rogers, J.D.; Huddleston, S.W.; Konkel, H.E.; Rosev, B.J.

    1989-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant is being installed at Los Alamos to be used as the pulsed power generator for the Confinement Physics Research Facility. The generator is mounted on a spring foundation to avoid dynamic forces from being transmitted to the substructure and the ground. A 6 MW load-commutated inverter drive will accelerate the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method is being changed from hydrogen to air cooling. A current limiting fuse, with a fuse clearing current of 80 kA, will protect the generator output against short circuit currents. Changes in the excitation system are described. A status report of the installation and an approximate schedule for completing the installation are presented. The paper also addresses results of special studies and tests undertaken to evaluate the condition of the generator and to predict the behavior of some critical mechanical generator components under pulsed loading conditions. 1 ref., 4 figs., 2 tabs

  5. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  6. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  7. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  8. Multi-megawatt wind-power installations call for new, high-performance solutions

    International Nuclear Information System (INIS)

    2004-01-01

    This article discusses the development of increasingly powerful and profitable wind-energy installations for off-shore, on-shore and refurbishment sites. In particular, the rapid development of megawatt-class units is discussed. The latest products of various companies with rotor diameters of up to 120 metres and with power ratings of up to 5 MW are looked at and commented on. The innovations needed for the reduction of weight and the extreme demands placed on gearing systems are discussed. Also, the growing markets for wind energy installations in Europe and the United States are discussed and plans for new off-shore wind parks are looked at

  9. The Installation of a P.E.T. Pharmacy at Washington University

    International Nuclear Information System (INIS)

    Gaehle, G.; Schwarz, S.; Mueller, M.; Margenau, B.; Welch, M.J.

    2003-01-01

    Washington University has produced radioisotopes for medical application since the early 1960s. In order to serve seven PET scanners and to meet more stringent government regulations we have installed a new PET pharmacy based on our past years of experiences. The new pharmacy was installed at the site of the 3.7 MeV tandem cascade accelerator that was decommissioned in April of 2001. The pharmacy consists of a production lab, quality control lab, reagent preparation lab, shipping and storage area and an office. Security and safety was a main consideration in the design of this PET pharmacy

  10. Proposal to negotiate a contract, without competitive tendering, for the supply and installation of pipework for the new hostel

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate a contract for the supply and installation of new piping as preparatory work for the construction of a third on-site hostel. For the reasons explained in this document, the Finance Committee is invited to approve a contract with the SERVICES INDUSTRIELS DE GENEVE (SIG) (CH), without competitive tendering, for the supply and installation of new piping for an amount not exceeding 700 000 Swiss francs, not subject to revision.

  11. An application of residual current protective device at electrical installation

    International Nuclear Information System (INIS)

    Firman Silitonga

    2008-01-01

    In an electrical installation, a protection for overload and short circuit are always to be installed. In addition to the installation, it is necessary to be installed a protection device for residual current because both the short circuit and the overload device protection will not work for the residual current. The quantity of the residual current must be defined first at any electrical installation to define an appropriate residual current protection so that not every residual current will break the circuit down. This paper will explain a method how to install a residual protection device for 3500 VA or more at TN and TT of earthing system. (author)

  12. Creation of the NUR mountain-level installation aimed at registration of super-high-energy showers in cosmic rays

    CERN Document Server

    Chubenko, A P; Martyanov, I S; Sadykov, K; Zastrozhnova, N N

    2002-01-01

    Description of the NUR installation aimed at registration of extensive air showers (EAS) is presented. The installation is sited near Almaty at a height of 3340 m above sea level at the Jusaly Kezen pass to the Tien Shan foothills. The distinctive characteristic of the installation from other similar existing ones is its location at a mountain slope under a 30 deg. angle relative to the horizon. Due to this orientation, the accuracy of measurement of EAS incidence angles exceeding 40 deg. increases significantly.

  13. Site Features

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of various site features from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times...

  14. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  15. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  16. Development and installation of the GERDA experiment

    International Nuclear Information System (INIS)

    Smolnikov, A

    2010-01-01

    The progress in the development of the GERDA (GErmanium Detector Array) experiment is presented. The goal of the experiment is the search for neutrinoless double beta decay of 76 Ge with considerable reduction of background in comparison with predecessor experiments. GERDA will operate bare germanium semiconductor detectors (enriched in 76 Ge) submerged in high purity liquid argon supplemented by a water shield. The experimental set up is currently under construction in the underground facility of LNGS, Italy. The results of various R and D efforts and the main steps of the GERDA set up design and installation are given as well as several novel methods for background reduction are described.

  17. Basic electrical installation work level 2

    CERN Document Server

    Linsley, Trevor

    2015-01-01

    Everything needed to pass the first part of the City & Guilds 2365 Diploma in Electrical InstallationsUpdated in line with the 3rd Amendment of the 17th Edition IET Wiring Regulations, this new edition covers the City & Guilds 2365-02 course. Written in an accessible style with a chapter dedicated to each unit of the syllabus, this book helps you to master each topic before moving on to the next. End of chapter revision questions enable learners to check their understanding and consolidate key concepts learnt in each chapter. With a companion website containing videos, animations, worksheets a

  18. RF installation for the grain disinfestation

    CERN Document Server

    Zajtzev, B V; Kobetz, A F; Rudiak, B I

    2001-01-01

    The ecologically pure method of grain product disinfestations through the grain treatment with the RF electric field is described. The experimental data obtained showed that with strengths of the electrical RF field of E=5 kV/cm and frequency of 80 MHz the relative death rate is 100%.The time of the grain treatment it this case is 1 sec. The pulses with a duration of 600 mu s and repetition rate of 2 Hz were used, the duration of the front was 10 mu s. The schematic layout of installation with a productivity of 50 tones/h and power of 10 kW is given.

  19. Safety culture in nuclear installations. Proceedings

    International Nuclear Information System (INIS)

    Carnino, A.; Weimann, G.

    1995-04-01

    These proceedings of the International Topical Meeting on Safety Culture in Nuclear Installations held in Vienna, Austria from 24 to 28 April 1995 provide a wide forum of information exchange and discussions on the topic safety culture in nuclear power plants. Safety culture deals with human factors since it deals with attitudes, organization and management. It then means that it has a natural component in it which is linked to the national culture and education. There are about 95 contributions, some of them presented by title and abstract only. All of them are in the subject scope of INIS. (Botek)

  20. Estimating Wear Of Installed Ball Bearings

    Science.gov (United States)

    Keba, John E.; Mcvey, Scott E.

    1993-01-01

    Simple inspection and measurement technique makes possible to estimate wear of balls in ball bearing, without removing bearing from shaft on which installed. To perform measurement, one observes bearing cage while turning shaft by hand to obtain integral number of cage rotations and to measure, to nearest 2 degrees, number of shaft rotations producing cage rotations. Ratio between numbers of cages and shaft rotations depends only on internal geometry of bearing and applied load. Changes in turns ratio reflect changes in internal geometry of bearing provided measurements made with similar bearing loads. By assuming all wear occurs on balls, one computes effective value for this wear from change in turns ratio.

  1. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  2. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    The first study analysing the regulations governing the licensing and inspection of nuclear installations in OECD countries was published by OECD/NEA in 1980, and revised in 1986. Since then there have been amendments to national regulations on the subject, which have warranted updating of this publication. This new study provides a description of the licensing regulations and practices applied in the twenty OECD countries with provisions in that field. The national systems have been described according to a standard format to make comparisons and research easier. In most cases, the descriptions are supplemented by flow charts illustrating the procedures and specifying the different authorities involved in the licensing procedures [fr

  3. Jim Walter Resources installs new overland conveyor

    Energy Technology Data Exchange (ETDEWEB)

    Fiscor, S.

    2008-12-15

    Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

  4. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  5. Safety culture in nuclear installations. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Carnino, A [ed.; International Atomic Energy Agency, Vienna (Austria); Weimann, G [ed.; Oesterreichisches Forschungszentrum Seibersdorf GmbH (Austria)

    1995-04-01

    These proceedings of the International Topical Meeting on Safety Culture in Nuclear Installations held in Vienna, Austria from 24 to 28 April 1995 provide a wide forum of information exchange and discussions on the topic safety culture in nuclear power plants. Safety culture deals with human factors since it deals with attitudes, organization and management. It then means that it has a natural component in it which is linked to the national culture and education. There are about 95 contributions, some of them presented by title and abstract only. All of them are in the subject scope of INIS. (Botek).

  6. CAST with its micromegas detector installed.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    The CERN Axion Solar Telescope (CAST) uses a prototype LHC dipole magnet to search for very weakly interacting neutral particles called axions, which should originate in the core of the Sun. The magnet converts the solar axions to photons which are then detected by an X-ray detector based on Micromegas technology. CAST's Micromegas detector has now been installed. Photos 01 02: General view of the CAST experiment with the Micromegas detector in place. Photo 03: Close-up of the micromegas set-up.

  7. Border installations: the experience of Wackersdorf

    International Nuclear Information System (INIS)

    Heller, K.

    1988-01-01

    Following the decision of the Government of the Federal Republic of Germany to construct a fuel reprocessing plant (in the wider context of organising radioactive waste disposal) at Wackersdorf, 130 km from the Austrian border, actions were brought against the German constructor before Austrian and German courts. The author describes the mechanisms governing administrative procedures in both countries and their connection with public international law. He analyses the legal argumentations developed before the different courts as well as the debate on the concept of territoriality and border installations (NEA) [fr

  8. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  9. Old radioactive waste storage sites

    International Nuclear Information System (INIS)

    2008-01-01

    After a recall of the regulatory context for the management of old sites used for the storage of radioactive wastes with respect with their activity, the concerned products, the disposal or storage type, this document describes AREVA's involvement in the radioactive waste management process in France. Then, for the different kinds of sites (currently operated sites having radioactive waste storage, storage sites for uranium mineral processing residues), it indicates their location and name, their regulatory status and their control authority, the reference documents. It briefly presents the investigation on the long term impact of uranium mineral processing residues on health and environment, evokes some aspects of public information transparency, and presents the activities of an expertise group on old uranium mines. The examples of the sites of Bellezane (uranium mineral processing residues) and COMURHEX Malvesi (assessment of underground and surface water quality at the vicinity of this installation) are given in appendix

  10. Testing various modes of installation for permanent broadband stations in open field environment

    Science.gov (United States)

    Vergne, Jérôme; Charade, Olivier; Arnold, Benoît; Louis-Xavier, Thierry

    2014-05-01

    In the framework of the RESIF (Réseau Sismologique et géodésique Français) project, we plan to install more than one hundred new permanent broadband stations in metropolitan France within the next 6 years. Whenever possible, the sensors will be installed in natural or artificial underground cavities that provide a stable thermal environment. However such places do not exist everywhere and we expect that about half the future stations will have to be set up in open fields. For such sites, we are thus looking for a standard model of hosting infrastructure for the sensors that would be easily replicated and would provide good noise level performances at long periods. Since early 2013, we have been operating a prototype station at Clévilliers, a small location in the sedimentary Beauce plain, where we test three kinds of buried seismic vaults and a down-hole installation. The cylindrical seismic vaults are 3m deep and 1m wide and only differ by the type of coupling between the casing and the concrete slab where we installed insulated Trillium T120PA seismometers. The down-hole installation consists in a 3m deep well hosting a Trillium Posthole seismometer. For reference, another sensor has been installed in a ~50cm deep hole, similarly to the way we test every new potential site. Here we compare the noise level in each infrastructure at different frequencies. We observe quite similar performances for the vertical component recorded in the different wells. Conversely, the noise levels on the horizontal components at periods greater than 10s vary by more than 20dB depending on the installation condition. The best results are obtained in the completely decoupled vault and for the down-hole setting, both showing performances comparable to some of our permanent stations installed in tunnels. The amplitude of the horizontal noise also appears to be highly correlated to wind speed recorded on site, even at long periods. The variable response of each vault to such

  11. Proper Installation of New Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  12. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or... wiring. ...

  13. 46 CFR 176.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...

  14. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  15. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  16. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  17. Site decontamination

    International Nuclear Information System (INIS)

    Bicker, A.E.

    1981-01-01

    Among the several DOE sites that have been radiologically decontaminated under the auspices of the Nevada Operations Office are three whose physical characteristics are unique. These are the Tatum Dome Test Site (TDTS) near Hattiesburg, Mississippi; a location of mountainous terrain (Pahute Mesa) on the Nevada Test Site; and the GNOME site near Carlsbad, New Mexico. In each case the contamination, the terrain, and the climate conditions were different. This presentation includes a brief description of each site, the methods used to perform radiological surveys, the logistics required to support the decontamination (including health physics and sample analysis), and the specific techniques used to reduce or remove the contamination

  18. Classified installations for environmental protection subject to declaration. Tome 2

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Legislation concerning classified installations govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation, air pollution, water pollution, noise, wastes produced by installations, even aesthetic bad effects. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the secretary of state for the environment are listed in tome 2

  19. The impact of green stormwater infrastructure installation on surrounding health and safety.

    Science.gov (United States)

    Kondo, Michelle C; Low, Sarah C; Henning, Jason; Branas, Charles C

    2015-03-01

    We investigated the health and safety effects of urban green stormwater infrastructure (GSI) installments. We conducted a difference-in-differences analysis of the effects of GSI installments on health (e.g., blood pressure, cholesterol and stress levels) and safety (e.g., felonies, nuisance and property crimes, narcotics crimes) outcomes from 2000 to 2012 in Philadelphia, Pennsylvania. We used mixed-effects regression models to compare differences in pre- and posttreatment measures of outcomes for treatment sites (n=52) and randomly chosen, matched control sites (n=186) within multiple geographic extents surrounding GSI sites. Regression-adjusted models showed consistent and statistically significant reductions in narcotics possession (18%-27% less) within 16th-mile, quarter-mile, half-mile (P<.001), and eighth-mile (P<.01) distances from treatment sites and at the census tract level (P<.01). Narcotics manufacture and burglaries were also significantly reduced at multiple scales. Nonsignificant reductions in homicides, assaults, thefts, public drunkenness, and narcotics sales were associated with GSI installation in at least 1 geographic extent. Health and safety considerations should be included in future assessments of GSI programs. Subsequent studies should assess mechanisms of this association.

  20. Seismic methodology in determining basis earthquake for nuclear installation

    International Nuclear Information System (INIS)

    Ameli Zamani, Sh.

    2008-01-01

    Design basis earthquake ground motions for nuclear installations should be determined to assure the design purpose of reactor safety: that reactors should be built and operated to pose no undue risk to public health and safety from earthquake and other hazards. Regarding the influence of seismic hazard to a site, large numbers of earthquake ground motions can be predicted considering possible variability among the source, path, and site parameters. However, seismic safety design using all predicted ground motions is practically impossible. In the determination of design basis earthquake ground motions it is therefore important to represent the influences of the large numbers of earthquake ground motions derived from the seismic ground motion prediction methods for the surrounding seismic sources. Viewing the relations between current design basis earthquake ground motion determination and modem earthquake ground motion estimation, a development of risk-informed design basis earthquake ground motion methodology is discussed for insight into the on going modernization of the Examination Guide for Seismic Design on NPP

  1. Propeller installation effects on turboprop aircraft acoustics

    Science.gov (United States)

    Chirico, Giulia; Barakos, George N.; Bown, Nicholas

    2018-06-01

    Propeller installation options for a twin-engined turboprop aircraft are evaluated at cruise conditions, aiming to identify the quieter configuration. Computational fluid dynamics is used to investigate the near-field acoustics and transfer functions are employed to estimate the interior cabin noise. Co-rotating and counter-rotating installation options are compared. The effect of propeller synchrophasing is also considered. The employed method captures the complexity of the acoustic field generated by the interactions of the propeller sound fields among each other and with the airframe, showing also the importance of simulating the whole problem to predict the actual noise on a flying aircraft. Marked differences among the various layouts are observed. The counter-rotating top-in option appears the best in terms of acoustics, the top-out propeller rotation leading to louder noise because of inflow conditions and the occurrence of constructive acoustic interferences. Synchrophasing is shown to be beneficial for co-rotating propellers, specially regarding the interior noise, because of favorable effects in the interaction between the propeller direct sound field and the noise due to the airframe. An angle closer to the maximum relative blade shift was found to be the best choice, yielding, however, higher sound levels than those provided by the counter-rotating top-in layout.

  2. Performance of Installed Cooking Exhaust Devices

    Energy Technology Data Exchange (ETDEWEB)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  3. Regulation for installation and operation of reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Concerning the description of an application for the approval of installation of a reactor, stipulated in Article 23 paragraph 2 of the Law for Regulation of Nuclear Source Materials, Nuclear Fuel Materials and Reactors (hereinafter referred to as the Law), the following items must be written. Namely, the heat output of the reactor in Article 23 paragraph 2 item 3 of the Law, the position, structure and facilities of the reactor facilities, described according to the stipulated classifications, the work plan, nuclear fuel materials employed, and the disposal of spent fuel. Concerning an application for the approval of a reactor installed aboard a foreign ship, stipulations are made separately. Description of an application for the approval of change of the heat output of a reactor and others should include the stipulated items. When it is wished to undergo inspection of the construction and performance of reactor facilities, an application for that end including the required items should be filed. Various safety measures preventing personnel from being exposed to radiation should be taken. When a foreign atomic-powered ship tries to enter a Japanese port, the stipulated necessary informations should be reported 60 days before such ship actually enters the Japanese port. A chief technician of reactors should take and pass the official examination. (Rikitake, Y.)

  4. Emotion in Painting and Art Installations.

    Science.gov (United States)

    Konečni, Vladimir J

    2015-01-01

    Paintings are static 2-dimensional images with limited narrative means. On the basis of a critical analysis of the relevant laboratory scaling studies, museum studies, and neuroaesthetic work, the article reaches a negative conclusion about most paintings' ability to engage sufficiently with general viewers' associative-memory systems, so as to lead to identification and empathy, and induce fundamental psychobiological emotions. In contrast, designers of art installations can draw on subtle combinations of several classes of stimulus properties with psychological significance subsumable under the classical concept of the sublime (physical grandeur, rarity, an association with beauty and with biologically significant outcomes), so that some installations may induce the peak aesthetic emotional response, aesthetic awe--as defined in Aesthetic Trinity Theory (Konečni, 2005, 2011), along with the states of being moved and physiological thrills. The approach also involves an analytical skepticism about emotivism, defined as a culturological proclivity for unnecessary insertion of emotion into accounts of mental life and behavior, especially in the arts. Implications for the role of emotion theory in empirical aesthetics are examined.

  5. Nevada Test Site closure program

    International Nuclear Information System (INIS)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use

  6. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  7. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  8. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  9. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    International Nuclear Information System (INIS)

    WHITE, W.F.

    1999-01-01

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services

  10. 46 CFR 181.520 - Installation and location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  11. Some suggestions based on the instrumentation installation experience at RAPP

    International Nuclear Information System (INIS)

    Raghunath, M.R.; Singh, S.; Jain, V.K.

    1977-01-01

    Suggestions regarding installation of reactor instrumentation have been made based on the instrumentation installation experience at the Rajasthan Atomic Power Plant. It has been mentioned that the instrumentation installation work has to proceed simultaneously with that of the heavy equipment and piping errection work, to meet the commissioning target dates. (S.K.K.)

  12. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  13. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  14. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  15. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, F.T.Y.

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  16. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activit...

  17. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... an exhaust pipe. (b) Exhaust gas must not leak from the piping or any connections. The piping must be...

  18. Installation of beam screens in LHC arc cryomagnets

    CERN Document Server

    Cruikshank, P; Schneider, G; Veness, R J M

    1999-01-01

    Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which has been adopted.

  19. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  20. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation of appliances. 3280... Fuel Burning Systems § 3280.709 Installation of appliances. (a) The installation of each appliance... the manufacturer's instructions attached to the appliance. Every appliance shall be secured in place...

  1. Installation of the backfill and plug test

    International Nuclear Information System (INIS)

    Gunnarsson, D.; Borgesson, L.; Hokmark, H.; Hohannesson, L.E.; Sanden, T.

    2003-01-01

    The Backfill and Plug Test is a full scale test of backfill material, backfilling technique and a tunnel plug. The main objectives of the Backfill and Plug Test are: - to develop and test different materials and compaction techniques for backfilling of tunnels excavated by blasting; - to test the function of the backfill and its interaction with the surrounding rock in a tunnel excavated by blasting; - to develop technique for building tunnel plugs and to test the function. The installation was made in the Swedish underground laboratory, Aspo HRL, during 1999. The inner part of the tunnel is not used for the test but was filled with drainage material. The test volume, which is about 28 m long, can be divided into the following three parts: - the inner part filled with backfill containing 30% bentonite; - the outer part filled with backfill without bentonite and bentonite blocks and pellets at the roof; - the plug. Permeable layers divide the test volume into 11 test sections. The permeable layers are used for increasing the water saturation rate in the backfill and for applying hydraulic gradients between the layers for studying the flow of water in the backfill and in the near field rock. The permeable layers were installed every 2.2 m and each layer is divided into three units in order to separately measure the flow close to the roof, in the central areas of the tunnel and close to the floor. The outer part ends with a wall of prefabricated concrete beams that were used for temporary support of the backfill during the casting of the plug. The upper volume close to the plug is filled with bentonite pellets and blocks consisting of 20% bentonite and 80% sand. The backfill is instrumented with 34 pore water pressure cells, 21 total pressure cells, 57 sensors for monitoring the water saturation and 13 gauges for measuring the local hydraulic conductivity. The water pressures in the permeable mats are measured in all sections. Four pressure cylinders, 2 in the roof

  2. Post-installation geotechnical issues associated with large-scale HDD crossings

    Energy Technology Data Exchange (ETDEWEB)

    Baumgard, A.; Savigny, K.W. [BGC Engineering, Calgary, AB (Canada); Cocciolo, P. [Terasen Pipelines Inc., Calgary, AB (Canada)

    2004-07-01

    Horizontal directional drilling (HDD) is often used to install pipeline crossings beneath rivers, through mountains, or beneath urban infrastructure. HDD processes can often lead to the development of localized sinkholes and settlement above installed pipelines. This paper provided several examples of the unfavorable ground conditions and HDD installation procedures responsible for the development of sinkholes and settlement. Various mitigation measures designed to prevent both sinkhole and settlement from occurring after HDD installation were also presented. Case studies from 2 large HDD crossings were presented in order to illustrate the potential magnitude of post-HDD sinkholes and settlements at a crossing of the Fraser River located near Vancouver, British Columbia; and at major river crossing in north-central Argentina. Both case studies showed that large sinkholes formed behind HDD exit points, which resulted in property damage and eventually threatened the stability of neighbouring utilities. Triggering factors relating to unfavourable ground conditions included loose soils; compressible ground; fluctuating water tables; and high conductivity soils. Triggering factors relating to HDD installation methods included excessive annulus size; differences in entry/exit point elevation; excessive washing; and excessive circulating pressure. Several remediation options used in the case studies were also discussed, as well as site investigation and design techniques implemented to minimize the potential for sinkhole development. It was concluded that potential sinkhole and settlement triggering factors must be identified as early as possible during the construction and design phases of a project in order to allow for the implementation of mitigation measures. 6 refs., 8 figs.

  3. Site organization and site arrangement

    International Nuclear Information System (INIS)

    Boissonnet, B.; Macqueron, J.F.

    1976-01-01

    The present paper deals with criteria for the choice of a production unit or power plant site, the organization and development of a site in terms of its particular characteristics and takes into account personnel considerations in site organizations as well as the problem of integrating the architecture into the environment. (RW) [de

  4. Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Al-Haddad, Tristan [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Valdes, Francisco [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Caravati, Kevin [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Goodman, Joseph [Georgia Tech Applied Research Corporation, Atlanta, GA (United States)

    2015-08-27

    The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project. Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the

  5. Installing QGIS 2.0 and Adding Layers

    Directory of Open Access Journals (Sweden)

    Jim Clifford

    2013-12-01

    Full Text Available In this lesson you will install QGIS software, download geospatial files like shapefiles and GeoTIFFs, and create a map out of a number of vector and raster layers. Quantum or QGIS is an open source alternative to the industry leader, ArcGIS from ESRI. QGIS is multiplatform, which means it runs on Windows, Macs, and Linux and it has many of the functions most commonly used by historians. ArcGIS is prohibitively expensive and only runs on Windows (though software can be purchased to allow it to run on Mac. However, many universities have site licenses, meaning students and employees have access to free copies of the software (try contacting your map librarian, computer services, or the geography department. QGIS is ideal for those without access to a free copy of Arc and it is also a good option for learning basic GIS skills and deciding if you want to install a copy of ArcGIS on your machine. Moreover, any work you do in QGIS can be exported to ArcGIS at a later date if you decide to upgrade. The authors tend to use both and are happy to run QGIS on Mac and Linux computers for basic tasks, but still return to ArcGIS for more advanced work. In many cases it is not lack of functions, but stability issues that bring us back to ArcGIS. For those who are learning Python with the Programming Historian, you will be glad to know that both QGIS and ArcGIS use Python as their main scripting language.

  6. Methodological proposal of grounding in commercial and industrial installations

    International Nuclear Information System (INIS)

    Rodriguez Araya, Michael Eduardo

    2013-01-01

    A methodology is elaborated for the design of methods of commercial and industrial grounding. International standards and technical documents related with the grounding in the electrical design are studied in commercial and industrial installations. The design techniques of earthing systems are investigated. The topics that were covered to develop a design proposal have been: the analysis of resistivity, soil types, calculations of step voltages, contact and voltage of mesh. A field visit is programmed in nearby of the Escuela de Ingenieria Electrica at the Universidad de Costa Rica, to realize the pertinent measurements of resistivity for the design of a hypothetical grounding mesh for a future installation. The tellurometer (GP-1 model) of the brand Amprobe Instrument was used to provide the data from ground resistivity. The equipment has used four electrodes and has implemented the Wenner method for calculations. A earthing design is realized in a company in the industrial or commercial sector of Costa Rica. The earthing designs are realized to protect equipments found at the site and are affected by conditions such as: atmospheric overloads, transients, sags, interruptions or any event that may to affect the quality of the energy. The resistivity of an ground has depended largely on the amount of moisture that has presented. A correct earthing system should cover the greater amount of the total area of the building, and to comply with the voltage of mesh necessary for the design has been optimal. The design of any earthing has depended on unique characteristics that have been indicated by the location of industry [es

  7. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Kolpa, R.; Smith, K.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASF No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.

  8. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  9. Buffer protection in the installation phase

    International Nuclear Information System (INIS)

    Wimelius, Hans; Pusch, Roland

    2008-12-01

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving this and for providing alarm signals if the allowed pressure is

  10. Buffer protection in the installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Wimelius, Hans (Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)); Pusch, Roland (Geodevelopment International AB, Lund (Sweden))

    2008-12-15

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving

  11. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Azoeuf, P; Guillon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  12. Importance of human factors on nuclear installations safety

    International Nuclear Information System (INIS)

    Caruso, G.J.

    1990-01-01

    Actually, installations safety and, in particular the nuclear installations infer a strong incidence in human factors related to the design and operation of such installations. In general, the experience aims to that the most important accidents have happened as result of the components' failures combination and human failures in the operation of safety systems. Human factors in the nuclear installations may be divided into two areas: economy and human reliability. Human factors treatments for the safety evaluation of the nuclear installations allow to diagnose the weak points of man-machine interaction. (Author) [es

  13. Site selection for offshore wind farms along the Indian coast

    Digital Repository Service at National Institute of Oceanography (India)

    ManiMurali, R.; Vidya, P.J.; Modi, P.; JayaKumar, S.

    This study deals with locating the potential sites for offshore wind farms and also deals with feasibility of installing offshore wind farms through scientific examination of the requirements along the coast of India Offshore wind energy is almost...

  14. Implementing Relative Ranking Evaluation Framework at Department of Energy (DOE) installations

    International Nuclear Information System (INIS)

    Sharma, S.K.; Williamson, D.; Treichel, L.C.; James, L.M.

    1996-01-01

    The US Department of Energy (DOE) Office of Environmental Restoration (EM-40) has developed the Relative Ranking Evaluation Framework (RREF) to help categorize release sites, facilities and buildings requiring restoration or decommissioning. Based on this framework, a computer tool, the Relative Rank Evaluation Program (RREP) has been developed to evaluate release sites, facilities and buildings, and to manage information pertaining to relative ranking evaluations. The relative ranking information is being used by both Headquarters and field project managers, and other environmental personnel responsible for planning, executing and evaluation environmental restoration activities at DOE installations. External stakeholders, such as representatives of federal and state regulatory agencies, local governments and communities in the vicinity of current and formerly used DOE installations may use this data to review proposed and planned activities

  15. Nuclear Plant Analyzer: Installation manual. Volume 1

    International Nuclear Information System (INIS)

    Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R.

    1995-01-01

    This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays

  16. Safety of nuclear installations. An international comparison

    International Nuclear Information System (INIS)

    Renner, Andrea; Diwes, Andreas; Reingardt, Martin

    2010-01-01

    Safeguarding of nuclear power plants against disruptive actions or other external hazards is part of the plant design and presumption of an operation license. The general principle is defense in depth involving different security zones with separate barriers. The safeguards for nuclear installations are organized in three areas of responsibility: governmental measures (police, military), technical (detectors, scanners, illuminations, camera tracking, concrete barriers) and personnel measures (access control, security personnel, alarm) of the operating company. International responsibilities results from the treaty on the non-proliferation of nuclear weapons and several IAEA documents. The authors discuss the national regulations in Germany, Switzerland, United Kingdom and USA. Older NPPs that are not in compliance with actual safety standards will be a topic of increasing importance.

  17. Safety installation for preventing pollution by pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Wittgenstein, G F

    1972-10-25

    A safety installation for preventing pollution by pipelines, particularly those used for transporting liquid hydrocarbons, is described. It is applicable to any pipeline, but particularly to underground or submarine pipelines, whether made of steel, plastics, or any other material. The 4 essential objects of the invention are to insure reliable prevention of pollution of the environment due to leakage of a hydrocarbon through cracks in the pipe; to evacuate the leakage flow without delay to a vessel; to signal almost instantaneously the existence of a leak; and to effect remote control of operations by which the dynamic pressure in the pipe is cancelled. Each equipped section consists of a fluid-type jacket of plastic material which surrounds the pipe, which at its ends is sealed off. It is these seals which delimit the sections. (7 claims)

  18. ACP Facility Safety Surveillance System Installation

    International Nuclear Information System (INIS)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P.

    2006-10-01

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO 2 into U-metal. For demonstration of this process, α-γ type new hotcell was built in the IMEF basement. All facilities which treat radioactive materials must manage CCTV system which is under control of Health Physics department. Three main points (including hotcell rear door area) have each camera, but operators who are in charge of facility management need to check the safety of the facility immediately through the network in his office. This needs introduce additional network cameras installation and this new surveillance system is expected to update the whole safety control ability with existing system

  19. A tangible digital installation in the classroom

    DEFF Research Database (Denmark)

    Marchetti, Emanuela; Valente, Andrea

    2015-01-01

    This paper describes a three weeks study involving 15 children affected by autism spectrum disorders (9-12 years old) in a primary Danish school. The aim of the study was to support the class teachers in assessing the benefits of game-based learning with respect to their main two challenges......: facilitating the emergence of imagination and conceptual thinking, and managing the interplay between cooperation and competition. This cooperation originates from one of the teachers’ interest in MicroCulture, a digital and tangible installation earlier created by the authors and aimed at bridging history...... learning across museums and schools. The design of MicroCulture focused on urban development seen as a social process; in order to cover children’s multiple play modalities and support their interaction with guides and teachers, MicroCulture offers exploratory gameplay, with no predefined final goal...

  20. Conventional radiology: fixed installations in medical environment

    International Nuclear Information System (INIS)

    2010-01-01

    This document presents the different procedures, the different types of specific hazards, the analysis of risks, their assessment and the preventive methods with regard to radioprotection in the case of fixed conventional radiology equipment in medical environment. It indicates and describes the concerned personnel, the course of procedures, the hazards, the identification of the risk associated with ionizing radiation, the risk assessment and the determination of exposure levels (definition of regulated areas, personnel categories), the strategy aimed at controlling the risk (risk reduction, technical measures concerning the installation or the personnel, teaching and information, prevention, incident), the different measures of medical monitoring, the assessment of risk control, and other risks. An appendix proposes an example of workstation assessment

  1. Survey of medical radium installations in Wisconsin

    International Nuclear Information System (INIS)

    Tapert, A.C.; Lea, W.L.

    1975-05-01

    A radiation protection survey was performed at 70 medical radium installations in the State of Wisconsin. The requirements of the State's Radiation Protection Code were used as survey criteria. Radiation measurements of radium storage containers, radium capsule leakage tests, and monitoring of work surfaces for contamination were performed. Film badge monitoring data of whole body and extremity doses are presented for 221 individuals at 17 hospitals. Whole body doses during single treatments ranged from 10 to 1360 mrems per individual. The estimate of 500 mrems per treatment was determined as the dose aggregate to hospital personnel. Whole body doses from film badges are compared with analogous TLD doses. Four physicians and six technicians at nine hospitals participated in a study for monitoring the extremities with TLD. Cumulative extremity doses ranged from 28 to 6628 mrems per participant during the study. (U.S.)

  2. Designing performativity for mixed reality installations

    Directory of Open Access Journals (Sweden)

    Andrew Morrison

    2010-07-01

    Full Text Available This article takes up the concept of performativity prevalent in the humanities and applies it to the design of installation arts in mixed reality mode. Based on the design, development and public access to two specific works, the concept is related to a form of research by design. We argue that the concept of performativity may be further usefully employed in investigations (design and research, artistic and public into digital arts where complex intersections between concepts, technologies, dramaturgy, media and participant actions are in flux and together constitute the emergence and experience of a work. Theories of performativity are related to these two works in an argument that further suggests there is room in research by design to also include ‘performative design’. The article is the result of a wide-ranging interdisciplinary collaboration and aims to convey some sense of that in its reporting style, content and analysis.

  3. New electricity generating installations - Czech experience

    International Nuclear Information System (INIS)

    Biza, K.; Pazdera, F.; Zdarek, J.

    2004-01-01

    Economically and technically are analysed alternatives for new electricity generation installations (GEN 111+ NPPs, finalization of NPPs under construction, lifetime extension of existing NPPs, coal plants and gas plants). Described are experienced with NPP Temelin (lessons learned from its design, construction, start-up and resent operation and service experience) and new Czech Energy Policy, where the nuclear energy is an important source for electricity generation. Discussed is also impact of potential trading with CO 2 limits and strategy on minimization of dependence on energy from politically unstable regions. Underlined is important role of preparation of young generation for safe and reliable long term operation of NPPs. General recommendation is to orient on finalization of NPPs under construction, lifetime extension of existing NPPs and long term orientation on new generation of NPPs (GEN III+ and GEN IV). (author)

  4. NBS-LANL RTM injector installation

    International Nuclear Information System (INIS)

    Wilson, M.A.; Ayres, R.L.; Cutler, R.I.; Lindstrom, E.R.; Martin, E.R.; Mohr, D.L.; Penner, S.; Yoder, N.R.; Young, L.M.

    1983-01-01

    The injector for the NBS-LANL CW racetrack microtron consists of a 100 KeV electron gun and beam transport line followed by a 5 MeV linac. The function of the gun and transport line, which have been installed at NBS, is to provide a chopped and bunched 100 KeV and up to 0.67 mA dc or pulsed beam of very low transverse emittance for matched insertion into the linac. In this paper the authors present both the design and construction details of the 100 KeV system and the results of preliminary beam tests. The tests conducted thus far show the gun and transport system to be performing well within design specifications

  5. Installation for low temperature vapor explosion experiment

    International Nuclear Information System (INIS)

    Nilsuwankosit, Sunchai; Archakositt, Urith

    2000-01-01

    A preparation for the experiment on the low temperature vapor explosion was planned at the department of Nuclear Technology, Chulalongkorn University, Thailand. The objective of the experiment was to simulate the interaction between the molten fuel and the volatile cooling liquid without resorting to the high temperature. The experiment was expected to involve the injection of the liquid material at a moderate temperature into the liquid material with the very low boiling temperature in order to observe the level of the pressurization as a function of the temperatures and masses of the applied materials. For this purpose, the liquid nitrogen and the water were chosen as the coolant and the injected material for this experiment. Due to the size of the installation and the scale of the interaction, only lumped effect of various parameters on the explosion was expected from the experiment at this initial stage. (author)

  6. Gas heat pump installation at Paderborn

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    A gas heat pump installation at the swimming pool and sport center in Paderborn, developed by Ruhrgas A.G. has a heat capacity of 4650 kW, the largest up to this time and recovers heat from ground water under the sport center, shower, and swimming pool effluent, and air exhausted from the swimming pool to provide 182% of the energy obtained from the natural gas alone. This compares with an 80% efficiency for a conventional boiler fired with natural gas. Natural gas consumption by the sport center has been reduced from 1.2 million m/sup 3/ y to 520,000 m/sup 3//y, a 56% savings. Three identical units each have an eight-cylinder, four-cycle, 253 kW-gas engine.

  7. Testing installation for a steam generator

    International Nuclear Information System (INIS)

    Dubourg, M.

    1985-01-01

    The invention proposes a testing installation for a steam generator associated to a boiler, comprising a testing exchanger connected to a feeding circuit in secondary fluid and to a circuit to release the steam produced, and comprising a heating-tube bundle connected to a closed circuit of circulation of a primary coolant at the same temperature and at the pressure than the primary fluid. The heating-tube bundle of the testing exchanger has the same height than the primary bundle of the steam generator and the testing exchanger is at the same level and near the steam generator and is fed by the same secondary fluid such as it is subject to the same operation phases during a long period. The in - vention applies, more particularly, to the steam generators of pressurized water nuclear power plants [fr

  8. Skin: an interactive hyperstereoscopic electro installation

    Science.gov (United States)

    Kostis, Helen-Nicole; Kooima, Robert; Kannenberg, John

    2007-02-01

    It is the uniqueness of Virtual Reality as a medium that calls for the creation of hybrid realities which blur the finite boundaries between physical and digital existence. Virtual Reality's distinguishing features as an artistic medium embody a distinct form of aesthetics: it is a stereoscopic, immersive, interactive, performative, dynamic, and experiential medium. A Virtual Reality art piece manifests in multiple ways. It can present itself as an interactive virtual archetype, exploring concepts rendered from different perspectives, and as an impetus to challenge the platform's capabilities, not only theoretically as an artistic practice, but also by calling for the instantiation of authoring tools for the development of virtual reality experiences. The paradigm presented in this paper is a Virtual Reality art piece, called skin, 2006, developed on Electro, which is an open-source cross-platform development environment. skin, 2006, is an interactive hypersteroscopic high-definition audiovisual installation that explores a dialogue between physical and digital senses of "touch".

  9. Installation of an isotope separator in Debrecen

    International Nuclear Information System (INIS)

    Gacsi, Z.; Gulyas, J.; Vitez, A.; Csige, L.; Krasznahorkay, A.

    2005-01-01

    Complete text of publication follows. An isotope separator named OSIRIS was decommissioned in Studsvik, Sweden last July. Researchers there offered this equipment to us for dismantling and moving it over to ATOMKI in Debrecen for installation at the cyclotron lab and save and use it in nuclear physics and other sciences where stable and radioactive isotopes are used extensively for fundamental and applied research. Since the separator was used to separate radioactive isotopes, the ion source with its beam extracting, shaping, and transporting accessories, as well as the lining inside the bending magnet, furthermore the beam diagnostic and shaping elements in the 'switchyard' part of the separator had to stay in Studsvik because of the high radioactive contamination. In order to operate this equipment, first we have to design and manufacture these parts together with a new endstation for the collection and handling of the separated isotopes. Parallel with the installation, we also concentrate on different applications of an isotope separator, including separation of stable isotopes for labelling special compounds used in many branches of sciences, medical care, and industry, and on studying single ion implantation possibilities, as well as on the production of special targets for nuclear physics research. First we want to separate stable isotopes, and then, when we overcome all technical pitfalls, we will consider using this equipment to separate radioactive isotopes as well. Our intention is to have this equipment available to anyone at ATOMKI and elsewhere interested in using its capabilities in their own research fields. Consequently, all comments, suggestion, and ideas are welcome now and continuously, since the design and manufacture of parts can then be oriented by taking into account all the suggestions as much as possible. (author)

  10. La Tourette site - Project of extension of the wind farm on the commune of Paizay-Le-Tort. Exploitation authorisation request file for an installation classified for the protection of the environment. Non technical summary of the environmental impact study. Non technical summary of the hazard study, Opinion of the administrative authority competent in the field of the environment

    International Nuclear Information System (INIS)

    2015-03-01

    A first report proposes an analysis of the initial condition of the concerned site through a description of physical (administrative geography, climate, topography and geology, risks, hydrology), natural (remarkable natural spaces, land use, habitats and flora, fauna, green and blue belt), and human (demography, activities, cultural heritage) environments. The next part presents the general context of the project (energy needs, stakes of wind energy, general presentation of the project, implantation hypothesis, project justification in the national context). The next part proposes an analysis of impacts of the project: generalities on development effects, impacts during exploitation, synthesis of the assessment of Natura 2000 effects, synthesis of cumulated effects. The last part of this first report presents measures aimed at suppressing, reducing or compensating project impacts from the development phase until the dismantling phase. Various planning documents and schemes are provided. A report proposes an analysis of risks related to the wind farm project, and more particularly to the presence of wind turbines. The last document states the opinion of the environmental authority

  11. Protocol between the Nuclear Protection and Safety Bureau of Portugal and the Nuclear Energy Commission of Spain on Technical Information concerning Nuclear Installations in Border Areas

    International Nuclear Information System (INIS)

    1980-01-01

    This Protocol was concluded under the Agreement of the same date on the safety of nuclear installations in border areas. Its purpose is to prescribe the type of information referred to in the Agreement. It lays down in detail all the documents to be supplied concerning the siting, construction, operation and decommissioning of nuclear installations, including the geological, seismological, meteorological, hydrological and ecological aspects of the sites concerned, for purposes of environmental protection; the characteristics of the projected installations and emergency plans must also be provided. Similarly to the Agreement, this Protocol will remain in force for a period of ten years. (NEA) [fr

  12. Groundwater quality monitoring well installation for Upper Waste Areas Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of seven groundwater quality monitoring (GQM) wells on the perimeter of Upper Waste Area Grouping (WAG) 2. Upper WAG 2 is composed of portions of White Oak Creek (WOC), Melton Branch, two of Melton Branch's tributaries, and the floodplains surrounding these water bodies. The WOC section of the subject site begins at the confluence of WOC and Melton Branch and extends 0.62 mile upstream to the 7,500 bridge. The Melton Branch portion of the site also begins at the confluence of WOC and Melton Branch and extends eastward 0.88 mile upstream. The wells at Upper WAG 2 were drilled and developed between December 1989 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at Upper WAG-2. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  13. On alteration of reactor installation (additional installation of No.3 and No.4 plants in the Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc.)

    International Nuclear Information System (INIS)

    1985-01-01

    The Nuclear Safty Commission sent the reply to the Minister of International Trade and Industry on October 4, 1984, on this matter after having received the report from the Committee on Examination of Nuclear Reactor Safety and carried out the deliberation. It was judged that the applicant has the technical capability required for installing and operating these reactor facilities. Also it was judged that on the safety after these reactor plants are installed, there is no obstacle in the prevention of disaster due to contaminated substances and reactors. The policy of the investigation and deliberation is reported. The contents of the investigation and deliberation are the condition of location such as site, geological features and ground, earthquake, weather, hydraulic problem and social environments, the safety design of reactor facilities, the evaluation of radiation exposure dose in normal operation, the analysis of abnormal transient change in operation, accident analysis and the evaluation of location. (Kako, I.)

  14. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  15. 1990 No. 1918. The Nuclear Installations Act 1965 (Repeal and Modifications) Regulations 1990

    International Nuclear Information System (INIS)

    1990-01-01

    These Regulations entered into force on 31 October 1990. They repeal part of Section (1) of the Nuclear Installations Act 1965 to remove the exemption of the United Kingdom Atomic Energy Authority (UKAEA) from licensing under the Act. The Regulations also amend the 1965 Act to ensure that the UKAEA's duties in respect of the safety of premises it occupies will continue to apply whether or not a nuclear site licence has been granted. (NEA) [fr

  16. Decree No. 83/7405 of 18 November 1983 on the licensing procedure for nuclear installations

    International Nuclear Information System (INIS)

    1983-01-01

    This Decree (No. 83/7405) on the licensing procedure for nuclear installations came into force on 19 December 1983 and supersedes Decree No. 7/9141 of 5 December 1974 on the same subject. The general lines of the licensing procedure laid down by this new Decree are similar to that provided by the 1979 Decree; it is also carried out in three stages: site, construction and operating licences are delivered in succession. (NEA) [fr

  17. Latest development in project site radwaste treatment facility (SRTF) Sanmen

    International Nuclear Information System (INIS)

    Mennicken, K.; Lohmann, P.

    2015-01-01

    Westinghouse Electric Germany GmbH (WEG) was successful in being awarded a contract as to the planning, delivery, installation and commissioning of radwaste treatment systems for the AP1000 units at Sanmen site, PR China. Operational low and intermediate level radioactive waste will be processed in the Site Radwaste Treatment Facility (SRTF). This paper explains the latest developments of the project, especially the experience with customer-hired Chinese planning partners, installation companies and Customer operating personnel. (authors)

  18. Sprucing up the site - update

    CERN Multimedia

    2009-01-01

    As mentioned in a previous article the Bulletin will be publishing regular short updates following the consolidation work going on around the CERN sites: All internal lighting is being replaced in the office buildings on the Prevessin site. Work has started in building 866 and will move to 864 and 865 later. New energy-efficient lights are being installed, which will reduce electricity consumption by 30 -50%, and in the common areas like corridors the lighting will be switched on by motion sensors. Also in the Prevessin site, the lines in the car parks are being repainted. This will continue in the Meyrin site later. Work has started in Building 30 to completely refurbish the AT Auditorium.

  19. Quattor: managing (complex) grid sites

    International Nuclear Information System (INIS)

    Jouvin, M

    2008-01-01

    Quattor is a tool developed to efficiently manage fabrics with hundreds or thousands of Linux machines, while still being able to manage smaller clusters easily. It was originally developed inside the European Data Grid (EDG) project and is now in use at more than 50 grid sites running gLite middleware, ranging from small LCG T3s to very large sites like CERN. Quattor's ability to factorize and to reuse common parts of service configurations permitted the development of the QWG templates: a complete set of standard templates to configure the OS and gLite middleware. Any site can just import and customize the configuration without editing the bulk of the templates. Collaboration around these templates results in a very efficient sharing of installation and configuration information between those sites using them

  20. Groundwater quality monitoring well installation for Waste Area Grouping 3 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 3. WAG 3 is located in Melton Valley, approximately 3,000 ft west of the west gate of Oak Ridge National Laboratory, and consists of an estimated 22 acres. The subject site contains three solid waste management units: the Contractors' Landfill, the Closed Scrap Metal Area, and Solid Waste Storage Area 3. The wells at WAG 3 were drilled and developed between September 1987 and August 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 3 were drilled with auger or air rotary rigs. Depending upon the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 3. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents