WorldWideScience

Sample records for installation igcc power

  1. The installation IGCC power plans in the petroleum refinement: international experiences and lessons for Mexico; La instalacion de plantas IGCC en la refinacion de petroleo: experiencias internacionales y lecciones para Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez, Joel [Ecole du Petrole et des Moteurs, Institut Franzais du Petrole, (France)

    2004-06-15

    In this work, are presented the technical and economic elements of the international experience for the installation of IGCC power plants in the petroleum refinement and the lessons for Mexico in the installation of this technology in PEMEX Refinacion are analyzed. The construction of IGCC power plants in the petroleum refinement has grown 14.3 % at worldwide level as of 1996, in which there was already an installed capacity of 160 MW. At the end of 2003 an installed capacity of 2,500 MW was reached. The growth in the installation of IGCC power plants fundamentally appears in Europe, being Italy and Spain leader countries in the construction of this technology in the petroleum refinement. However, countries like Holland, Japan, Singapore and the United States count on IGCC power plants for electricity and hydrogen generation, which take advantage of low value fuels such as vacuum tower residues, petroleum coke, asphalt, liquid fuels, among others. In Mexico, the installation IGCC power plants in the petroleum refinement is null, nevertheless Petroleos Mexicanos counts with the approval of the government for the installation of cogeneration power plants in its facilities. This approval would allow PEMEX to carry out projects for the installation IGCC power plants, specifically in PEMEX Refinacion, for the generation of electricity and hydrogen from the advantage of heavy residues of low economic value. The opportunity that the installation IGCC power plants in the petroleum refinement offers is directed towards the commercialization of the electricity and hydrogen, which would impel PEMEX Refinacion to enter the competition of the electrical market in Mexico. [Spanish] En este trabajo, se presentan los elementos tecnicos y economicos de la experiencia internacional para la instalacion de plantas IGCC en la refinacion de petroleo y se analizan las lecciones para Mexico en la instalacion de esta tecnologia en PEMEX Refinacion. La construccion de plantas IGCC en la

  2. Dynamic modeling of IGCC power plants

    International Nuclear Information System (INIS)

    Casella, F.; Colonna, P.

    2012-01-01

    Integrated Gasification Combined Cycle (IGCC) power plants are an effective option to reduce emissions and implement carbon-dioxide sequestration. The combination of a very complex fuel-processing plant and a combined cycle power station leads to challenging problems as far as dynamic operation is concerned. Dynamic performance is extremely relevant because recent developments in the electricity market push toward an ever more flexible and varying operation of power plants. A dynamic model of the entire system and models of its sub-systems are indispensable tools in order to perform computer simulations aimed at process and control design. This paper presents the development of the lumped-parameters dynamic model of an entrained-flow gasifier, with special emphasis on the modeling approach. The model is implemented into software by means of the Modelica language and validated by comparison with one set of data related to the steady operation of the gasifier of the Buggenum power station in the Netherlands. Furthermore, in order to demonstrate the potential of the proposed modeling approach and the use of simulation for control design purposes, a complete model of an exemplary IGCC power plant, including its control system, has been developed, by re-using existing models of combined cycle plant components; the results of a load dispatch ramp simulation are presented and shortly discussed. - Highlights: ► The acausal dynamic model of an entrained gasifier has been developed. ► The model can be used to perform system optimization and control studies. ► The model has been validated using field data. ► Model use is illustrated with an example showing the transient of an IGCC plant.

  3. Market potential of IGCC for domestic power production

    International Nuclear Information System (INIS)

    Gray, D.; Tomlinson, G.; Hawk, E.; Maskew, J.

    1999-01-01

    Mitretek Systems and CONSOL Inc. have completed the first phase of a market potential study for Integrated Coal Gasification Combined Cycle (IGCC) domestic power production. The U. S. Department of Energy (DOE) funded this study. The objective of this study is to provide DOE with data to estimate the future domestic market potential of IGCC for electricity generation. Major drivers in this study are the state of technology development, feedstock costs, environmental control costs, demand growth, and dispatchability. This study examines IGCC potential for baseload power production in the Northeast U. S., an important market area by virtue of existing coal infrastructure and proximity to coal producing regions. IGCC market potential was examined for two levels of technology development as a function of natural gas price and carbon tax. This paper discusses the results of this study, including the levels of performance and cost necessary to insure competitiveness with natural gas combined cycle plants

  4. Exergoeconomic evaluation of a KRW-based IGCC power plant

    International Nuclear Information System (INIS)

    Tsatsavonis, G.; Lin, L.; TawFik, T.; Gallaspy, D.T.

    1991-01-01

    This paper reports on a study supported by the US Department of Energy, in which several design configurations of Kellogg-Rust-Westinghouse (KRW)-based Integrated Gasification-Combined-Cycle (IGCC) power plants were developed. One of these configurations was analyzed from the exergoeconomic (thermoeconomic) viewpoint. The detailed exergoeconomic evaluation identified several changes for improving the cost effectiveness of this IGCC design configuration. Based on the cost information supplied by the M.W. Kellogg Company, an attempt was made to calculate the economically optimal exergetic efficiency for some of the most important plant components. This information is currently used in plant optimization studies

  5. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  6. RWE clean coal programme - IGCC power plant with CO{sub 2} capture & storage

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, K.-J.; Ewers, J.; Renzenbrink, W. [RWE Power AG, Essen (Germany)

    2007-07-01

    In early 2006, RWE Power announced it was building a 450 MW gross commercial IGCC power plant with carbon capture. This paper sums up the key results of the project development phase concerning the IGCC power plant and shows the basis for the feasibility phase of the project. 10 figs.

  7. Exergetic comparison of two KRW-based IGCC power plants

    International Nuclear Information System (INIS)

    Tsatsaronis, G.; Tawfik, T.; Lin, L.; Gallaspy, D.T.

    1991-01-01

    In studies supported by the U.S. Department of Energy and the Electric Power Research Institute, several design configurations of Kellogg-Rust-Westinghouse (KRW)-based Integrated Gasification-Combined-Cycle (IGCC) power plants were developed. Two of these configurations are compared in this paper, from the exergetic viewpoint. The exergetic comparison identifies the causes of performance differences between the two cases: differences in the exergy destruction of the gasification system, the gas turbine system, and the gas cooling process, as well as differences in the exergy loss accompanying the solids to disposal stream. The potential for using oxygen-blown versus air-blown KRW gasifiers, and hot gas versus cold gas cleanup processes is evaluated

  8. Integrated assessment of IGCC power generation technology with carbon capture and storage (CCS)

    International Nuclear Information System (INIS)

    Cormos, Calin-Cristian

    2012-01-01

    IGCC (Integrated Gasification Combined Cycle) is a power generation technology in which the solid feedstock is partially oxidized with oxygen and steam to produce syngas. In a conventional IGCC design without carbon capture, the syngas is purified for dust and hydrogen sulphide removal and then it is sent to a CCGT (Combined Cycle Gas Turbine) for power generation. CCS (Carbon capture and storage) technologies are expected to play a significant role in the coming decades for reducing the greenhouse gas emissions. IGCC is one of the power generation technologies having the highest potential to capture CO 2 with low penalties in term of plant energy efficiency, capital and operational costs. This paper investigates the most important techno-economic and environmental indicators (e.g. power output, ancillary consumption, energy efficiency, CW consumption, normalised mass and energy balances and plant construction materials, capital and O and M (operational and maintenance) costs, specific CO 2 emissions, cost of electricity, CO 2 removal and avoidance costs etc.) for IGCC with CCS. Coal-based IGCC cases produce around 400–450 MW net electricity with 90% carbon capture rate. Similar IGCC plants without CCS were presented as references. Future IGCC developments for energy vectors poly-generation were also presented. -- Highlights: ► Techno-economical evaluations of coal-based IGCC power generation with CCS. ► Model development for capital, O and M, CO 2 capture costs and cash flow estimations. ► Technical and economic investigations of key plant design characteristics. ► Evaluations of carbon capture options for IGCC power generation technology.

  9. Dynamic simulation of operating cases and malfunctions of an IGCC power plant system

    Energy Technology Data Exchange (ETDEWEB)

    Koch, I.; Hannemann, F. [Siemens AG, Power Generation (KWU), Erlangen (Germany); Hoffmann, U. [Technische Univ. Clausthal, Clausthal-Zellerfeld (Germany). Inst. fuer Chemische Verfahrenstechnik

    1999-07-01

    Fully integrated IGCC plants consist of several units. This novel integration of various plant systems places stiff new requirements on power plant design, as prediction of operating and faulted behavior is made more difficult by many different interactions. This is especially the case for the gas turbine fuel system in an IGCC power plant, as it affects and is affected by all of the other major plant systems. (orig.)

  10. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  11. A comparison of improved power plant technologies on lignite with (PFBC) and (IGCC) cycles

    International Nuclear Information System (INIS)

    Cherepnalkovski, Ilija

    1997-01-01

    Technologies and process diagrams descriptions for PFBC (Pressurised Fluidized Bed Combustion) and IGCC (Integrated Gasification Combined Cycle) are presented as for improved cycles with modern clean coal technologies, the most popular currently. A special attention is paid to the possibilities for Macedonian lignites use on the power plants with PFBC and IGCC cycles. The comparison of the above mention technologies has been done particularly on the desulfurization, NO x reduction, ash elimination and its use in the building and construction industries. A comparison between the power plants with PFBC and IGCC cycles is made by the following criteria: cycle efficiency, desulfurization and nitrogen oxides reduction, power plant complexity and their cost, as well as plant reliability. (Author)

  12. Recovery of flue gas energy in heat integrated IGCC power plants using the contact economizer system

    CSIR Research Space (South Africa)

    Madzivhandila, V

    2010-10-01

    Full Text Available Asia Pacific Confederation of APCChE 2010 Chemical Engineering Congress October 5-8, 2010, Taipei � �� Recovery of flue gas energy in heat integrated IGCC power plants using the contact economizer system Vhutshilo Madzivhandilaa, Thokozani... temperature and the thermal efficiency of the plant. The 13th Asia Pacific Confederation of APCChE 2010 Chemical Engineering Congress October 5-8, 2010, Taipei � �� 1. Introduction The IGCC (Integrated Gasification Combined Cycle) is one...

  13. Technical comparison between Integrated Gasification Combined Cycle (IGCC) and Natural Gas Combined Cycle (NGCC) power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz, Pablo Andres Silva; Venturini, Osvaldo Jose; Lora, Electo Eduardo Silva [Federal University of Itajuba - UNIFEI, MG (Brazil). Excellence Group in Thermal Power and Distributed Generation - NEST], e-mails: osvaldo@unifei.edu.br, electo@unifei.edu.br

    2010-07-01

    Among the emerging clean coal technologies for power generation, Integrated Gasification Combined Cycle (IGCC) and Natural Gas Combined Cycle (NGCC) systems are receiving considerable attention as a potentially attractive option to reduce the emissions of greenhouse gases (GHG). The main reason is because these systems has high efficiency and low emissions in comparison with traditional power generation plants. Currently in IGCC and NGCC systems at demonstration stage is been considered to implement CCS technology. CO{sub 2} emissions can be avoided in a gasification-based power plant because by transferring almost all carbon compounds to CO{sub 2} through the water gas shift (WGS) reaction, then removing the CO{sub 2} before it is diluted in the combustion stage. The aim of this study is to compare the technical performance of an IGCC system that uses Brazilian coal and petroleum coke as fuel with a NGCC system, with the same fixed output power of 450 MW. The first section of this paper presents the plant configurations of IGCC systems. The following section presents an analysis of NGCC technology. (author)

  14. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  15. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  16. Computer models and simulations of IGCC power plants with Canadian coals

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, L.; Furimsky, E.

    1999-07-01

    In this paper, three steady state computer models for simulation of IGCC power plants with Shell, Texaco and BGL (British Gas Lurgi) gasifiers will be presented. All models were based on a study by Bechtel for Nova Scotia Power Corporation. They were built by using Advanced System for Process Engineering (ASPEN) steady state simulation software together with Fortran programs developed in house. Each model was integrated from several sections which can be simulated independently, such as coal preparation, gasification, gas cooling, acid gas removing, sulfur recovery, gas turbine, heat recovery steam generation, and steam cycle. A general description of each process, model's overall structure, capability, testing results, and background reference will be given. The performance of some Canadian coals on these models will be discussed as well. The authors also built a computer model of IGCC power plant with Kellogg-Rust-Westinghouse gasifier, however, due to limitation of paper length, it is not presented here.

  17. Dynamic simulation of a low-temperature rectification Column as part of an IGCC power plant

    Energy Technology Data Exchange (ETDEWEB)

    Hanke, R. [Leipzig University of Applied Sciences, Department of Mechanical and Energy Engineering, P.O. Box 300066, D-04251 Leipzig (Germany); Hannemann, F. [Siemens AG - Power Generation, PG CTET, P.O. Box 3220, D-91050 Erlangen (Germany); Sundmacher, K. [Max Planck Institute of Dynamics of Complex Technical Systems, Sandtorstrasse 1, D-39106 Magdeburg (Germany); Otto-von-Guericke University Magdeburg, Faculty of Process and Systems Engineering, P.O. Box 4120, D-39106 Magdeburg (Germany)

    2003-11-01

    IGCC plants offer the opportunity to utilize fossil energy sources, like coal or heavy refinery residues, to satisfy increasing energy demand while considering strict environmental constraints. Such a plant consists of a combined power cycle, a fuel gasifier with downstream fuel gas conditioning and an air separation unit (ASU), where the oxygen required for gasification is produced. The low-temperature rectification column as the core of the ASU strongly affects the transient behavior of the system. (Abstract Copyright [2003], Wiley Periodicals, Inc.)

  18. Biomass IGCC

    Energy Technology Data Exchange (ETDEWEB)

    Salo, K; Keraenen, H [Enviropower Inc., Espoo (Finland)

    1997-12-31

    Enviropower Inc. is developing a modern power plant concept based on pressurised fluidized-bed gasification and gas turbine combined cycle (IGCC). The process is capable of maximising the electricity production with a variety of solid fuels - different biomass and coal types - mixed or separately. The development work is conducted on many levels. These and demonstration efforts are highlighted in this article. The feasibility of a pressurised gasification based processes compared to competing technologies in different applications is discussed. The potential of power production from biomass is also reviewed. (orig.) 4 refs.

  19. Biomass IGCC

    Energy Technology Data Exchange (ETDEWEB)

    Salo, K.; Keraenen, H. [Enviropower Inc., Espoo (Finland)

    1996-12-31

    Enviropower Inc. is developing a modern power plant concept based on pressurised fluidized-bed gasification and gas turbine combined cycle (IGCC). The process is capable of maximising the electricity production with a variety of solid fuels - different biomass and coal types - mixed or separately. The development work is conducted on many levels. These and demonstration efforts are highlighted in this article. The feasibility of a pressurised gasification based processes compared to competing technologies in different applications is discussed. The potential of power production from biomass is also reviewed. (orig.) 4 refs.

  20. The reliability of integrated gasification combined cycle (IGCC) power generation units

    Energy Technology Data Exchange (ETDEWEB)

    Higman, C.; DellaVilla, S.; Steele, B. [Syngas Consultants Ltd. (United Kingdom)

    2006-07-01

    This paper presents two interlinked projects aimed at supporting the improvement of integrated gasification combined cycle (IGCC) reliability. The one project comprises the extension of SPS's existing ORAP (Operational Reliability Analysis Program) reliability, availability and maintainability (RAM) tracking technology from its existing base in natural gas open and combined cycle operations into IGCC. The other project is using the extended ORAP database to evaluate performance data from existing plants. The initial work has concentrated on evaluating public domain data on the performance of gasification based power and chemical plants. This is being followed up by plant interviews in some 20 plants to verify and expand the database on current performance. 23 refs., 8 figs., 2 tabs.

  1. Thermal expansion of slag and fly ash from coal gasification in IGCC power plant

    Energy Technology Data Exchange (ETDEWEB)

    M. Aineto; A. Acosta; J.M.A. Rincon; M. Romero [University of Castilla La Mancha, Ciudad Real (Spain). Laboratory of Applied Mineralogy

    2006-11-15

    Integrated gasification in combined cycle (IGCC) is an electrical power generation system which is characterized to be a clean coal technology different than conventional process in combustible treatment. IGCC process gives rise to inorganic solid wastes in the form of vitreous slag and fly ashes with singular thermal properties. The gasification of the fuel takes place at high temperature and pressure in reducing atmosphere. Under that conditions, gases such as H{sub 2}, N{sub 2} or CO, which are the main components of the gas mixture in the gasifier, show a high solubility in the melt and during the cooling remain enclosed in the vitreous slag. When these wastes are afterward thermal treated in oxidizing conditions, two phenomena occur. The development of a crystalline phase by devitrification of the glassy matrix and the releasing of the enclosed gas, which starts at temperatures nearly to the softening point. At higher temperatures the bubbles with increasing kinetic energy tend to ascend with difficulty through the viscous liquid phase and promotes an expansive reaction, giving rise to a foam glass-ceramic product. This paper has been focused on the study of thermal expansion in slag and fly ash samples from the ELCOGAS IGCC power plant located in Puertollano (Spain). 18 refs., 11 figs., 1 tab.

  2. Puertollano IGCC Power Plant; Central de Gasificacion Integrada en Ciclo Combinado de Puertollano

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The Puertollano IGCC Power Plant, rated 335 MW and located in Puertollano, Ciudad Real, in the central area of Spain, is a project led by ELCOGAS, a company incorporated by the European utilities ENDESA, ELECTRICITE DE FRANCE, IBERDROLA HIDROCANTABRICO ELECTRICIDADE DE PURTUGAL, ENEL and NATIONAL POWER and the technology and equipment suppliers SIEMENS, KRUPP UHDE and BABCOCK WILCOX ESPANOLA. IGCC technology is based in a process of coal gasification to obtain a clean combustion synthetic gas, integrated with a combined cycle, agas and steam, electricity-generating unit. The energy efficiency which is aimed to achieve at the Plant is 46% in ISO conditions. The Gasification unit uses the process of pressurised entrained flow for coal gasification. The gas is produced by the reaction of coal with oxygen at high temperatures, of up to 1600 degree centigree. This process is capable of gasifying a wide variety of types and qualities of coal for the production of a synthetic fuel gas. In the case of Puertollano, the raw fuel is a 50% mixture by weight of local coal and petroleum coke. The oxygen needed in the process and the nitrogen used for covering the fuel is generated in the Air Separation. The Gas Cleaning and Sulphur Recovery Unit clean the gases from contaminants and solid particles before to send them to the Gas Turbine. The clean gas is burnt in gas turbine of the Combined Cycle Plant, producing electricity. The exhaust gases feed a heat recovery steam generator, which produces steam used to generate additional electricity in a conventional steam turbine. The gas turbine is capable of operating both with synthetic gas and with natural gas, allowing operation flexibility. The net output of the plant up to December 1999 was 3.061 GWh, from them 344 GWh were produced with synthetic gas. This project has an important technological value, being the first power plant which uses coal gasification to feed a combined cycle in Spain and being also the biggest power plant

  3. The role of IGCC technology in power generation using low-rank coal

    Energy Technology Data Exchange (ETDEWEB)

    Juangjandee, Pipat

    2010-09-15

    Based on basic test results on the gasification rate of Mae Moh lignite coal. It was found that an IDGCC power plant is the most suitable for Mae Moh lignite. In conclusion, the future of an IDGCC power plant using low-rank coal in Mae Moh mine would hinge on the strictness of future air pollution control regulations including green-house gas emission and the constraint of Thailand's foreign currency reserves needed to import fuels, in addition to economic consideration. If and when it is necessary to overcome these obstacles, IGCC is one variable alternative power generation must consider.

  4. Efficiency enhancement in IGCC power plants with air-blown gasification and hot gas clean-up

    International Nuclear Information System (INIS)

    Giuffrida, Antonio; Romano, Matteo C.; Lozza, Giovanni

    2013-01-01

    Air-blown IGCC systems with hot fuel gas clean-up are investigated. In detail, the gas clean-up station consists of two reactors: in the first, the raw syngas exiting the gasifier and passed through high-temperature syngas coolers is desulfurized by means of a zinc oxide-based sorbent, whereas in the second the sulfided sorbent is duly regenerated. The hot fuel gas clean-up station releases H 2 S-free syngas, which is ready to fuel the combustion turbine after hot gas filtration, and a SO 2 -laden stream, which is successively treated in a wet scrubber. A thermodynamic analysis of two air-blown IGCC systems, the first with cold fuel gas clean-up and the second with hot fuel gas clean-up, both with a state-of-the-art combustion turbine as topping cycle, shows that it is possible to obtain a really attractive net efficiency (more than 51%) for the second system, with significant improvements in comparison with the first system. Nevertheless, higher efficiency is accomplished with a small reduction in the power output and no sensible efficiency improvements seem to be appreciated when the desulfurization temperature increases. Other IGCC systems, with an advanced 1500 °C-class combustion turbine as the result of technology improvements, are investigated as well, with efficiency as high as 53%. - Highlights: ► Hot fuel gas clean-up is a highly favorable technology for IGCC concepts. ► Significant IGCC efficiency improvements are possible with hot fuel gas clean-up. ► Size reductions of several IGCC components are possible. ► Higher desulfurization temperatures do not sensibly affect IGCC efficiency. ► IGCC efficiency as high as 53% is possible with a 1500°C-class combustion turbine

  5. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    International Nuclear Information System (INIS)

    Perez-Fortes, M.; Bojarski, A.D.; Velo, E.; Nougues, J.M.; Puigjaner, L.

    2009-01-01

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data.

  6. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Fortes, M.; Bojarski, A. D.; Velo, E.; Nougues, J. M. [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain); Puigjaner, L., E-mail: luis.puigjaner@upc.edu [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain)

    2009-10-15

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data.

  7. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Fortes, M; Bojarski, A D; Velo, E; Nougues, J M; Puigjaner, L [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain)

    2009-10-15

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data. (author)

  8. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Fortes, M.; Bojarski, A.D.; Velo, E.; Nougues, J.M.; Puigjaner, L. [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain)

    2009-10-15

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data. (author)

  9. Towards retrofitting integrated gasification combined cycle (IGCC) power plants with solid oxide fuel cells (SOFC) and CO

    NARCIS (Netherlands)

    Thallam Thattai, A.; Oldenbroek, V.D.W.M.; Schoenmakers, L; Woudstra, T.; Purushothaman Vellayani, A.

    2017-01-01

    This article presents a detailed thermodynamic case study based on the Willem-Alexander Centrale (WAC) power plant in the Netherlands towards retrofitting SOFCs in existing IGCC power plants with a focus on near future implementation. Two systems with high percentage (up to 70%) biomass

  10. Integration optimisation of elevated pressure air separation unit with gas turbine in an IGCC power plant

    International Nuclear Information System (INIS)

    Han, Long; Deng, Guangyi; Li, Zheng; Wang, Qinhui; Ileleji, Klein E.

    2017-01-01

    Highlights: • IGCC thermodynamic model was setup carefully. • Simulations focus on integration between an elevated pressure ASU with gas turbine. • Different recommended solutions from those of low pressure ASUs are figured out. • Full N 2 injection and 80% air extraction was suggested as the optimum integration. - Abstract: The integration optimisation between an elevated pressure air separation unit (EP-ASU) and gas turbine is beneficial to promote net efficiency of an integrated gasification combined cycle (IGCC) power plant. This study sets up the thermodynamic model for a 400 MW plant specially coupled with an EP-ASU, aiming to examine system performances under different integrations and acquire the optimum solution. Influences of air extraction rate at conditions of without, partial and full N 2 injection, as well as the effects of N 2 injection rate when adopting separate ASU, partial and full integrated ASU were both analysed. Special attention has been paid to performance differences between utilising an EP-ASU and a low pressure unit. Results indicated that integration solution with a separate EP-ASU or without N 2 injection would not be reasonable. Among various recommended solutions for different integration conditions, N 2 injection rate increased with the growth of air extraction rate. The integration with an air extraction rate of 80% and full N 2 injection was suggested as the optimum solution. It is concluded that the optimum integration solution when adopting an EP-ASU is different from that using a low pressure one.

  11. Thermodynamic assessment of IGCC power plants with hot fuel gas desulfurization

    International Nuclear Information System (INIS)

    Giuffrida, Antonio; Romano, Matteo C.; Lozza, Giovanni G.

    2010-01-01

    In IGCC power plants, hot gas desulfurization (HGD) represents an attractive solution to simplify syngas treatments and to improve the efficiency, potentially reducing the final cost of electricity. In the present study, the various consequences of the introduction of a HGD station in the power plant are discussed and evaluated, in comparison with conventional near-ambient temperature clean-up. Attention is paid to the potential improvements of the overall energy balance of the complete power station, along with the requirements of the sorbent regeneration process, to the influence of the desulfurization temperature and to the different solutions needed to control the NO x emissions (altered by the presence of HGD). The net performance of complete IGCC power plants (with HGD or with conventional desulfurization) were predicted, with reference to status-of-the-art solutions based on an entrained flow, dry-feed, oxygen-blown gasifier and on an advanced, FB-class combined cycle. The net efficiency experiences about 2.5% point improvement with HGD, even if a small reduction in the power output was predicted, when using the same combustion turbine. An exhaustive sensitivity analysis was carried out to evaluate the effects of different working conditions at the HGD station, e.g. desulfurization temperature and oxygen content in the gaseous stream for sorbent regeneration. According to the obtained results, these parameters have a weak influence on the efficiency. In particular, a very elevated desulfurization temperature (above 400-500 o C) does not provide decisive thermodynamic advantages. Therefore, the HGD unit optimization can be driven by technical and economical aspects and by emission abatement requirements. For instance, utilization of nitrogen for HGD sorbent regeneration (rather than for syngas dilution) and higher fuel temperature may improve the NO formation. Hence, different strategies to achieve acceptable NO x emissions (e.g. steam dilution) and their

  12. Pushing forward IGCC and CO{sub 2}-free power plant technology at Siemens

    Energy Technology Data Exchange (ETDEWEB)

    Hannemann, E.; Vortmeyer, N.; Zimmermann, G. [Siemens AG, Erlangen (Germany). Power Generation

    2004-07-01

    Siemens Power Generation has entered into several R & D projects within the European Commissions' 5th and 6th Framework Programs. One objective of those projects is to develop advanced modular IGCC concepts for in-refinery energy and hydrogen supply. Additional projects are dealing with pre- and post-combustion decarbonisation technologies, which should achieve high carbon dioxide capture at low costs. In parallel, the development of advanced combustion systems including enhanced fuel flexibility and application of low BTU gases in the highly efficient Siemens V94.3A gas turbine are in progress. In further step the technology for burning hydrogen enriched gases resulting from decarbonisation in CO{sub 2} free power plants will be provided. This report documents the current status of these activities. 9 refs., 12 figs.

  13. Technical and economic assessments commercial success for IGCC technology in China

    International Nuclear Information System (INIS)

    Xiong, T.

    1998-01-01

    The experiences gained from several Integrated Gasification Combined Cycle (IGCC) demonstration plants operating in the US and Europe facilitate commercial success of this advanced coal-based power generation technology. However, commercialization of coal-based IGCC technology in the West, particularly in the US, is restricted due to the low price of natural gas. On the contrary, in China--the largest coal producer and consumer in the world--a lack of natural gas supply, strong demand for air pollution control and relatively low costs of manufacturing and construction provide tremendous opportunities for IGCC applications. The first Chinese IGCC demonstration project was initiated in 1994, and other potential IGCC projects are in planning. IGCC applications in re-powering, fuel switching and multi-generation also show a great market potential in China. However, questions for IGCC development in China remain; where are realistic opportunities for IGCC projects and how can these opportunities be converted into commercial success? The answers to these questions should focus on the Chinese market needs and emphasize economic benefits, not just clean, or power. High price of imported equipment, high financing costs, and the technical risk of first-of-a-kind installation barricade IGCC development in China. This paper presents preliminary technical and economic assessments for four typical IGCC applications in the Chinese marketplace: central power station, fuel switching, re-powering, and multi-generation. The major factors affecting project economics--such as plant cost, financing, prices of fuel and electricity and operating capacity factor--are analyzed. The results indicate that well-proven technology for versatile applications, preferred financing, reduction of the plant cost, environmental superiority and appropriate project structure are the key for commercial success of IGCC in China

  14. Incorporating IGCC and CaO sorption-enhanced process for power generation with CO2 capture

    International Nuclear Information System (INIS)

    Chen, Shiyi; Xiang, Wenguo; Wang, Dong; Xue, Zhipeng

    2012-01-01

    Highlights: ► CaO sorption-enhanced process is incorporated with IGCC for CO 2 capture. ► IGCC–CCS is simplified using CaO sorption-enhanced process. ► The electricity efficiency is around 31–33% and CO 2 capture efficiency exceeds 95%. ► Parameters such as sorption pressure influence the system performance. -- Abstract: Integrated gasification combined cycle (IGCC) is a power generation technology to convert solid fuels into electricity. IGCC with CCS is regarded as a promising option to mitigate CO 2 emission. In this paper, the CaO sorption-enhanced process is incorporated downstream with coal gasification to produce a hydrogen-rich stream for electricity production and CO 2 separation. A WGS-absorber substitutes the high- and low-temperature water–gas shift reactors and desulfurization units in conventional IGCC–CCS to produce a hydrogen-rich stream, which is sent onto a gas turbine. CaO is used as the sorbent to enhance hydrogen production and for CO 2 capture. Regeneration of CaO is completed via calcination in a regenerator vessel. The IGCC with CaO sorption-enhanced process is modeled and simulated using Aspen Plus software. Two commercial available gasification technologies, Shell and Texaco, are integrated with the sorption-enhanced process. The results showed IGCC with CaO sorption-enhanced process has a satisfactory system performance. Even though the net electricity efficiency is not as high as expected, just around 30–33%, the system has a high CO 2 capture efficiency ∼97% and low pollutant emissions. Moreover, compared with conventional IGCC–CCS, the schematic diagram of the IGCC–CCS process is simplified. Parameters that affect the plant performance are analyzed in the sensitive analysis, including WGS-absorber temperature, H 2 O/CO ratio, pressure, etc. Some challenges to the system are also discussed.

  15. Proceedings of the coal-fired power systems 94: Advances in IGCC and PFBC review meeting. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, H.M.; Staubly, R.K.; Venkataraman, V.K. [eds.

    1994-06-01

    The Coal-Fired Power Systems 94 -- Advances in IGCC and PFBC Review Meeting was held June 21--23, 1994, at the Morgantown Energy Center (METC) in Morgantown, West Virginia. This Meeting was sponsored and hosted by METC, the Office of Fossil Energy, and the US Department of Energy (DOE). METC annually sponsors this conference for energy executives, engineers, scientists, and other interested parties to review the results of research and development projects; to discuss the status of advanced coal-fired power systems and future plans with the industrial contractors; and to discuss cooperative industrial-government research opportunities with METC`s in-house engineers and scientists. Presentations included industrial contractor and METC in-house technology developments related to the production of power via coal-fired Integrated Gasification Combined Cycle (IGCC) and Pressurized Fluidized Bed Combustion (PFBC) systems, the summary status of clean coal technologies, and developments and advancements in advanced technology subsystems, such as hot gas cleanup. A keynote speaker and other representatives from the electric power industry also gave their assessment of advanced power systems. This meeting contained 11 formal sessions and one poster session, and included 52 presentations and 24 poster presentations. Volume I contains papers presented at the following sessions: opening commentaries; changes in the market and technology drivers; advanced IGCC systems; advanced PFBC systems; advanced filter systems; desulfurization system; turbine systems; and poster session. Selected papers have been processed separately for inclusion in the Energy Science and Technology Database.

  16. CO{sub 2}-capture in coal based IGCC power plants

    Energy Technology Data Exchange (ETDEWEB)

    Van Aart, F.; Fleuren, W.; Kamphuis, H.; Ploumen, P.; Jelles, S. [KEMA, Arnhem (Netherlands)

    2007-07-01

    The paper discusses IGCC with carbon capture and storage (CCS), both for retrofit and capture ready plants. The penalties for carbon dioxide capture are given, along with its effect on CAPEX and OPEC costs. 3 refs., 9 figs.

  17. IGCC power plant integrated to a Finnish pulp and paper mill. IEA Bioenergy. Techno-economic analysis activity

    Energy Technology Data Exchange (ETDEWEB)

    Koljonen, T.; Solantausta, Y. [VTT Energy, Espoo (Finland). New Energy Technologies; Salo, K.; Horvath, A. [Carbona Inc. (Finland)

    1999-11-01

    In Finland, the pulp and paper industry is the largest consumer of energy among the industries and its power demand will increase due to economical and strict environ- mental requirements. The ageing of oil and biomass boilers in Finland also represents a window of opportunity for the introduction of new environmentally sound technology with a high efficiency in power production, e.g., in biomass gasification. This site-specific study describes the technical and economic feasibility of a biomass gasification combined cycle producing heat and power for a typical Finnish pulp and paper mill. The mill produces SC (super calantered) paper 500 000 ADt/a. The paper mill employs sulphate pulp and GW (ground wood) pulp. The capacity of the pulp mill is 400 000 ADt/a (air dry ton/year) of which 120 000 ADt/a is used at the site. The heat demand of the integrate is covered by a recovery boiler and a bark boiler. A condensing steam turbine with two extractions generates electricity for the mill. The aim is to replace an old bark boiler by an IGCC (Integrated Gasification Combined Cycle) to enhance the economy and environmental performance of the power plant. The IGCC feasibility study is conducted for an pulp and paper integrate because of its suitable infrastructure for IGCC and a large amount of wood waste available at the site. For comparison, the feasibility of an IGCC integrated to a pulp mill is also assessed. The IGCC concept described is based on research and development work performed by Carbona, Inc., who acquired the rights for know-how of Enviropower, Inc. The operation and design of the IGCC concept is based on a 20 MWe gas turbine (MW151). The heat of gas turbine exhaust gas is utilised in a HRSG (Heat Recovery Steam Generator) of two pressure levels to generate steam for the pulp and paper mill and the steam turbine. The MCC power plant operates in condensing mode. The total investment cost of the IGCC plant is estimated at FIM 417 million (USD 83.4 million

  18. IGCC power plant integrated to a Finnish pulp and paper mill. IEA Bioenergy. Techno-economic analysis activity

    International Nuclear Information System (INIS)

    Koljonen, T.; Solantausta, Y.

    1999-01-01

    In Finland, the pulp and paper industry is the largest consumer of energy among the industries and its power demand will increase due to economical and strict environ- mental requirements. The ageing of oil and biomass boilers in Finland also represents a window of opportunity for the introduction of new environmentally sound technology with a high efficiency in power production, e.g., in biomass gasification. This site-specific study describes the technical and economic feasibility of a biomass gasification combined cycle producing heat and power for a typical Finnish pulp and paper mill. The mill produces SC (super calantered) paper 500 000 ADt/a. The paper mill employs sulphate pulp and GW (ground wood) pulp. The capacity of the pulp mill is 400 000 ADt/a (air dry ton/year) of which 120 000 ADt/a is used at the site. The heat demand of the integrate is covered by a recovery boiler and a bark boiler. A condensing steam turbine with two extractions generates electricity for the mill. The aim is to replace an old bark boiler by an IGCC (Integrated Gasification Combined Cycle) to enhance the economy and environmental performance of the power plant. The IGCC feasibility study is conducted for an pulp and paper integrate because of its suitable infrastructure for IGCC and a large amount of wood waste available at the site. For comparison, the feasibility of an IGCC integrated to a pulp mill is also assessed. The IGCC concept described is based on research and development work performed by Carbona, Inc., who acquired the rights for know-how of Enviropower, Inc. The operation and design of the IGCC concept is based on a 20 MWe gas turbine (MW151). The heat of gas turbine exhaust gas is utilised in a HRSG (Heat Recovery Steam Generator) of two pressure levels to generate steam for the pulp and paper mill and the steam turbine. The MCC power plant operates in condensing mode. The total investment cost of the IGCC plant is estimated at FIM 417 million (USD 83.4 million

  19. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  20. Development of ITM oxygen technology for integration in IGCC and other advanced power generation

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Phillip A. [Air Products And Chemicals, Inc., Allentown, PA (United States)

    2015-03-31

    Ion Transport Membrane (ITM) technology is based on the oxygen-ion-conducting properties of certain mixed-metal oxide ceramic materials that can separate oxygen from an oxygen-containing gas, such as air, under a suitable driving force. The “ITM Oxygen” air separation system that results from the use of such ceramic membranes produces a hot, pure oxygen stream and a hot, pressurized, oxygen-depleted stream from which significant amounts of energy can be extracted. Accordingly, the technology integrates well with other high-temperature processes, including power generation. Air Products and Chemicals, Inc., the Recipient, in conjunction with a dozen subcontractors, developed ITM Oxygen technology under this five-phase Cooperative Agreement from the laboratory bench scale to implementation in a pilot plant capable of producing power and 100 tons per day (TPD) of purified oxygen. A commercial-scale membrane module manufacturing facility (the “CerFab”), sized to support a conceptual 2000 TPD ITM Oxygen Development Facility (ODF), was also established and operated under this Agreement. In the course of this work, the team developed prototype ceramic production processes and a robust planar ceramic membrane architecture based on a novel ceramic compound capable of high oxygen fluxes. The concept and feasibility of the technology was thoroughly established through laboratory pilot-scale operations testing commercial-scale membrane modules run under industrial operating conditions with compelling lifetime and reliability performance that supported further scale-up. Auxiliary systems, including contaminant mitigation, process controls, heat exchange, turbo-machinery, combustion, and membrane pressure vessels were extensively investigated and developed. The Recipient and subcontractors developed efficient process cycles that co-produce oxygen and power based on compact, low-cost ITMs. Process economics assessments show significant benefits relative to state

  1. Economic evaluation of pre-combustion CO2-capture in IGCC power plants by porous ceramic membranes

    International Nuclear Information System (INIS)

    Franz, Johannes; Maas, Pascal; Scherer, Viktor

    2014-01-01

    Highlights: • Process simulations of IGCC with pre-combustion capture via membranes were done. • Most promising technology is the water–gas-shift-membrane-reactor (WGSMR). • Energetic evaluations showed minimum efficiency loss of 5.8%-points for WGSMR. • Economic evaluations identified boundary limits of membrane technology. • Cost of electricity for optimum WGSMR-case is 57 €/MW h under made assumptions. - Abstract: Pre-combustion-carbon-capture is one of the three main routes for the mitigation of CO 2 -emissions by fossil fueled power plants. Based on the data of a detailed technical evaluation of CO 2 -capture by porous ceramic membranes (CM) and ceramic membrane reactors (WGSMR) in an Integrated-Gasification-Combined-Cycle (IGCC) power plant this paper focuses on the economic effects of CO 2 -abatement. First the results of the process simulations are presented briefly. The analysis is based on a comparison with a reference IGCC without CO 2 -capture (dry syngas cooling, bituminous coal, efficiency of 47.4%). In addition, as a second reference, an IGCC process with CO 2 removal based on standard Selexol-scrubbing is taken into account. The most promising technology for CO 2 -capture by membranes in IGCC applications is the combination of a water gas shift reactor and a H 2 -selective membrane into one water gas shift membrane reactor. For the WGSRM-case efficiency losses can be limited to about 6%-points (including losses for CO 2 compression) for a CO 2 separation degree of 90%. This is a severe reduction of the efficiency loss compared to Selexol (10.3% points) or IGCC–CM (8.6% points). The economic evaluation is based on a detailed analysis of investment and operational costs. Parameters like membrane costs and lifetime, costs of CO 2 -certificates and annual operating hours are taken into account. The purpose of these evaluations is to identify the minimum cost of electricity for the different capture cases for the variation of the boundary

  2. Feasibility analysis of gas turbine inlet air cooling by means of liquid nitrogen evaporation for IGCC power augmentation

    International Nuclear Information System (INIS)

    Morini, Mirko; Pinelli, Michele; Spina, Pier Ruggero; Vaccari, Anna; Venturini, Mauro

    2015-01-01

    Integrated Gasification Combined Cycles (IGCC) are energy systems mainly composed of a gasifier and a combined cycle power plant. Since the gasification process usually requires oxygen as the oxidant, an Air Separation Unit (ASU) is also part of the plant. In this paper, a system for power augmentation in IGCC is evaluated. The system is based on gas turbine inlet air cooling by means of liquid nitrogen spray. In fact, nitrogen is a product of the ASU, but is not always exploited. In the proposed plant, the nitrogen is first liquefied to be used for inlet air cooling or stored for later use. This system is not characterized by the limits of water evaporative cooling systems (the lower temperature is limited by air saturation) and refrigeration cooling (the effectiveness is limited by the pressure drop in the heat exchanger). A thermodynamic model of the system is built by using a commercial code for energy conversion system simulation. A sensitivity analysis on the main parameters is presented. Finally the model is used to study the capabilities of the system by imposing the real temperature profiles of different sites for a whole year and by comparing to traditional inlet air cooling strategies. - Highlights: • Gas turbine inlet air cooling by means of liquid nitrogen spray. • Humidity condensation may form a fog which provides further power augmentation. • High peak and off peak electric energy price ratios make the system profitable

  3. Thermodynamic simulation of CO{sub 2} capture for an IGCC power plant using the calcium looping cycle

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y. [National Engineering Laboratory for Coal-Burning Pollutant Emission Reduction, Shandong University, Jinan (China); Zhao, C.; Ren, Q. [School of Energy and Environment, Southeast University, Nanjing (China)

    2011-06-15

    A CO{sub 2} capture process for an integrated gasification combined cycle (IGCC) power plant using the calcium looping cycle was proposed. The CO{sub 2} capture process using natural and modified limestone was simulated and investigated with the software package Aspen Plus. It incorporated a fresh feed of sorbent to compensate for the decay in CO{sub 2} capture activity during long-term cycles. The sorbent flow ratios have significant effect on the CO{sub 2} capture efficiency and net efficiency of the CO{sub 2} capture system. The IGCC power plant, using the modified limestone, exhibits higher CO{sub 2} capture efficiency than that using the natural limestone at the same sorbent flow ratios. The system net efficiency using the natural and modified limestones achieves 41.7% and 43.1%, respectively, at the CO{sub 2} capture efficiency of 90% without the effect of sulfation. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  4. Analysis of IGCC-based plants with carbon capture for an efficient and flexible electric power generation

    International Nuclear Information System (INIS)

    Sorgenfrei, Max

    2016-01-01

    In this work, systems based on the Integrated gasification combined cycle (IGCC) technology with carbon capture are analyzed regarding an efficient and flexible electric power generation. All analysis are related to a high-efficiency or low-cost IGCC base case with carbon capture which are both commercially available. In the high-efficiency base case, thermodynamic inefficiencies are determined based on a conventional exergy analysis. The gasifier followed by the combustion chamber of the gas turbine running on syngas are rated to the largest inefficiencies. Based on an advanced exergy analysis, the inefficiencies are split into an avoidable and unavoidable part as well as an endogenous and exogenous part. For example, it was found that about half of the inefficiencies within the gasifier are caused by other components of the overall system(exogenous part). Further investigations on the combination of both splitting types are presented. The gas turbine system is identified to be a major component and therefore a detailed model was developed using state-of-the-art technologies. Based on this model, 12 types of characteristic inefficiencies were determined and rated by their exergy destruction. Chemical-Looping Combustion (CLC) is one of the most promising technologies to enhance the available IGCC design. CLC uses composite metal particles acting as an oxygen carrier to transport oxygen from the air to the fuel gas through a redox-cycle. Thus, the inefficiencies associated with the combustion process decrease and the application of physical absorption for capturing CO 2 is replaced by an inherent CO 2 -capture. In this work, the most suitable oxygen carriers for CLC using syngas (nickel oxide and iron oxide) are analyzed at different temperatures. Moreover, different types of gasifier as well as CLC reactor designs are analyzed. Regenerating the oxygen carrier by steam and air, produces additional hydrogen from the reduction of steam which is further combusted

  5. Multi-fuel multi-product operation of IGCC power plants with carbon capture and storage (CCS)

    International Nuclear Information System (INIS)

    Cormos, Ana-Maria; Dinca, Cristian; Cormos, Calin-Cristian

    2015-01-01

    This paper investigates multi-fuel multi-product operation of IGCC plants with carbon capture and storage (CCS). The investigated plant designs co-process coal with different sorts of biomass (e.g. sawdust) and solid wastes, through gasification, leading to different decarbonised energy vectors (power, hydrogen, heat, substitute natural gas etc.) simultaneous with carbon capture. Co-gasification of coal with different renewable energy sources coupled with carbon capture will pave the way towards zero emissions power plants. The energy conversions investigated in the paper were simulated using commercial process flow modelling package (ChemCAD) in order to produce mass and energy balances necessary for the proposed evaluation. As illustrative cases, hydrogen and power co-generation and Fischer–Tropsch fuel synthesis (both with carbon capture), were presented. The case studies investigated in the paper produce a flexible ratio between power and hydrogen (in the range of 400–600 MW net electricity and 0–200 MW th hydrogen considering the lower heating value) with at least 90% carbon capture rate. Special emphasis were given to fuel selection criteria for optimisation of gasification performances (fuel blending), to the selection criteria for gasification reactor in a multi-fuel multi-product operation scenario, modelling and simulation of whole process, to thermal and power integration of processes, flexibility analysis of the energy conversion processes, in-depth techno-economic and environmental assessment etc. - Highlights: • Assessment of IGCC-based energy vectors poly-generation systems with CCS. • Optimisation of gasification performances and CO 2 emissions by fuel blending. • Multi-fuel multi-product operation of gasification plants

  6. IGCC crosses the threshold

    Energy Technology Data Exchange (ETDEWEB)

    Broderick, J E

    1986-07-01

    This paper describes the development of the Texaco Coal Gasification Process (TCGP), the first of the advanced gasification processes to become commercialized. The utilization of this process in various demonstration and commercial plants is described. The design of the Cool Water integrated gasification combined cycle (IGCC) plant in California is discussed in some detail. This plant has been operating successfully since June 1984, and has demonstrated that the Texaco gasification technology for electric power generation is commercially viable, can use many different feedstocks, has substantial efficiency growth potential, can provide competitively lower cost electric power, and offers vastly superior environmental performance.

  7. Recovery of flue gas energy in heat-integrated gasification combined cycle (IGCC) power plants using the contact economizer system

    CSIR Research Space (South Africa)

    Madzivhandila, VA

    2011-03-01

    Full Text Available (flue gas) stream of a heat-integrated gasification combined cycle (IGCC) design of the Elcogas plant adopted from previous studies. The underlying support for this idea was the direct relationship between efficiency of the IGCC and the boiler feedwater...

  8. IGCC technology and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J [A. Ahlstrom Corporation, Karhula (Finland). Hans Ahlstrom Lab.; Lundqvist, R G [A. Ahlstrom Corporation, Helsinki (Finland); Staahl, K [Sydkraft AB, Malmoe (Sweden)

    1997-12-31

    Future energy production will be performed by advanced technologies that are more efficient, more environmentally friendly and less expensive than current technologies. Integrated gasification combined cycle (IGCC) power plants have been proposed as one of these systems. Utilising biofuels in future energy production will also be emphasised since this lowers substantially carbon dioxide emissions into the atmosphere due to the fact that biomass is a renewable form of energy. Combining advanced technology and biomass utilisation is for this reason something that should and will be encouraged. A. Ahlstrom Corporation of Finland and Sydkraft AB of Sweden have as one part of company strategies adopted this approach for the future. The companies have joined their resources in developing a biomass-based IGCC system with the gasification part based on pressurised circulating fluidized-bed technology. With this kind of technology electrical efficiency can be substantially increased compared to conventional power plants. As a first concrete step, a decision has been made to build a demonstration plant. This plant, located in Vaernamo, Sweden, has already been built and is now in commissioning and demonstration stage. The system comprises a fuel drying plant, a pressurised CFB gasifier with gas cooling and cleaning, a gas turbine, a waste heat recovery unit and a steam turbine. The plant is the first in the world where the integration of a pressurised gasifier with a gas turbine will be realised utilising a low calorific gas produced from biomass. The capacity of the Vaernamo plant is 6 MW of electricity and 9 MW of district heating. Technology development is in progress for design of plants of sizes from 20 to 120 MWe. The paper describes the Bioflow IGCC system, the Vaernamo demonstration plant and experiences from the commissioning and demonstration stages. (orig.)

  9. IGCC technology and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J. [A. Ahlstrom Corporation, Karhula (Finland). Hans Ahlstrom Lab.; Lundqvist, R.G. [A. Ahlstrom Corporation, Helsinki (Finland); Staahl, K. [Sydkraft AB, Malmoe (Sweden)

    1996-12-31

    Future energy production will be performed by advanced technologies that are more efficient, more environmentally friendly and less expensive than current technologies. Integrated gasification combined cycle (IGCC) power plants have been proposed as one of these systems. Utilising biofuels in future energy production will also be emphasised since this lowers substantially carbon dioxide emissions into the atmosphere due to the fact that biomass is a renewable form of energy. Combining advanced technology and biomass utilisation is for this reason something that should and will be encouraged. A. Ahlstrom Corporation of Finland and Sydkraft AB of Sweden have as one part of company strategies adopted this approach for the future. The companies have joined their resources in developing a biomass-based IGCC system with the gasification part based on pressurised circulating fluidized-bed technology. With this kind of technology electrical efficiency can be substantially increased compared to conventional power plants. As a first concrete step, a decision has been made to build a demonstration plant. This plant, located in Vaernamo, Sweden, has already been built and is now in commissioning and demonstration stage. The system comprises a fuel drying plant, a pressurised CFB gasifier with gas cooling and cleaning, a gas turbine, a waste heat recovery unit and a steam turbine. The plant is the first in the world where the integration of a pressurised gasifier with a gas turbine will be realised utilising a low calorific gas produced from biomass. The capacity of the Vaernamo plant is 6 MW of electricity and 9 MW of district heating. Technology development is in progress for design of plants of sizes from 20 to 120 MWe. The paper describes the Bioflow IGCC system, the Vaernamo demonstration plant and experiences from the commissioning and demonstration stages. (orig.)

  10. Thermodynamic evaluation of CHP (combined heat and power) plants integrated with installations of coal gasification

    International Nuclear Information System (INIS)

    Ziębik, Andrzej; Malik, Tomasz; Liszka, Marcin

    2015-01-01

    Integration of a CHP steam plant with an installation of coal gasification and gas turbine leads to an IGCC-CHP (integrated gasification combined cycle-combined heat and power). Two installations of coal gasification have been analyzed, i.e. pressurized entrained flow gasifier – case 1 and pressurized fluidized bed gasifier with CO_2 recirculation – case 2. Basing on the results of mathematical modelling of an IGCC-CHP plant, the algorithms of calculating typical energy indices have been derived. The following energy indices are considered, i.e. coefficient of heat performance and relative savings of chemical energy of fuels. The results of coefficients of heat performance are contained between 1.87 and 2.37. Values exceeding 1 are thermodynamically justified because the idea of cogeneration of heat and electricity based on combining cycles of the heat engine and heat pump the efficiency of which exceeds 1. Higher values concerning waste heat replace more thermodynamically effective sources of heat in CHP plants. Relative savings of the chemical energy of fuels are similar in both cases of IGCC-CHP plants and are contained between the lower value of the CHP (combined heat and power) plants fuelled with coal and higher value of CHP plants fired with natural gas. - Highlights: • Energy savings of fuel is an adequate measure of cogeneration. • Relative energy savings of IGCC-CHP is near the result of a gas and steam CHP. • COHP (coefficient of heat performance) can help to divide fuel between heat fluxes. • Higher values of COHP in the case of waste heat recovery result from the lower thermal parameters.

  11. Corrosion of ceramics for slag removal in IGCC-power plants; Korrosion von Keramiken fuer die Fluessigascheabscheidung in IGCC-Kraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Fuerst, Denny

    2012-06-12

    Coal gasification and the subsequent production of electricity from syngas in combined-cycle powerplants allows plant efficiencies of up to 43% (LHV). Existing technologies allow up to 50% in the short term. Efficiencies beyond 50% however, require concepts and technologies that still need a certain amount of research and development. One such method to raise plant efficiencies would be a high temperature (at temperatures above the melting point of the ash) syngas cleaning. To effectively utilize the heat from the syngas and enable high turbine inlet temperatures, it is necessary to remove slag particles from the hot gas. The feasibility of such a hot syngas cleaning has been successfully demonstrated for the Pressurized Pulverized Coal Combustion (PPCC) by passing the hot gas through a bed of ceramic balls for slag removal. In order to apply this concept to IGCC powerplants the slag resistance of various ceramic materials had to be investigated under gasifying conditions. Therefore, lab-made ceramics and commercially available refractory materials where treated with liquid slag at 1600 C in a number of reducing atmospheres. At first, three synthetic slags with different basicity were used and after evaluating the results, selected materials were treated with a gasifier slag under continuous conditions. It was shown that both slag and ceramic have to be adjusted to ensure a sufficient corrosion resistance of the ceramic bed for slag removal. Furthermore, the impact of the porosity of the utilized ceramic on the corrosion resistance was shown. The composition of the reducing atmosphere (mainly the partial pressure of Oxygen) affected both physical and chemical properties of the slag via slag components that could easily be reduced or oxidized. The materials most suitable for use in slag separation were found to be dense chromium oxide and other ceramics containing a high amount of chromium oxide. [German] Mit Kohlevergasung und der anschliessenden Stromerzeugung in

  12. Modelling and dynamics of an air separation rectification column as part of an IGCC power plant

    Energy Technology Data Exchange (ETDEWEB)

    Seliger, B.; Hanke-Rauschenbach, R.; Hannemann, F.; Sundmacher, K. [Otto Von Guericke University, Magdeburg (Germany)

    2006-04-15

    An Integrated Gasification Combined Cycle plant (IGCC) opens the well-proven and highly efficient combined cycle process to fossil fuels, like coal or heavy refinery residues. Such a plant thereby possesses a novel linkage of typical energy engineering related units, e.g. a gas turbine and typical process engineering parts, which in the present case is an air separation plant. Different responses from the connected components can cause undesired mass flow fluctuations within the system especially during changing load demands. The cryogenic rectification column, as the core of the air separation plant, strongly affects the system's transient behaviour. The upper part of such a heat-integrated double column, a packed column with structured packing, has therefore been more closely investigated in the present paper. For this purpose, a dynamic model of such a column has been developed which is also able to describe the pressure dynamics supposedly responsible for these mass flow fluctuations. The transient behaviour of the uncontrolled column is analysed and discussed with special regard to pressure dynamics. The column pressure responds to disturbances on two different time scales. The short-term response, which is in the range of 100-200 s, is governed by the transient behaviour of the fluid dynamics and is discussed in detail. The long-term response is dominated by the nonlinear dynamics of the concentration profiles. The time constant of this response depends strongly on the direction and intensity of the disturbance and takes from 10,000 up to several 100,000 s.

  13. Design and evaluation of an IGCC power plant using iron-based syngas chemical-looping (SCL) combustion

    International Nuclear Information System (INIS)

    Sorgenfrei, Max; Tsatsaronis, George

    2014-01-01

    Highlights: • A new concept for power generation including carbon capture was found. • The air reactor temperature significantly influences the net efficiency. • The use of a CO 2 turbine decreases the net efficiency. • Compared to a conventional IGCC with 90% CO 2 capture the net efficiency increases. - Abstract: Chemical-looping combustion (CLC) is a novel and promising combustion technology with inherent separation of the greenhouse gas CO 2 . This paper focuses on the design and thermodynamic evaluation of an integrated gasification combined-cycle (IGCC) process using syngas chemical looping (SCL) combustion for generating electricity. The syngas is provided by coal gasification; the gas from the gasifier is cleaned using high-temperature gas desulfurization (HGD). In this study, the oxygen carrier iron oxide (Fe 2 O 3 ) is selected to oxidize the syngas in a multistage moving-bed reactor. The resulting reduced iron particles then consist of FeO and Fe 3 O 4 . To create a closed-cycle operation, these particles are partially re-oxidized with steam in a fluidized-bed regenerator to pure Fe 3 O 4 and then fully re-oxidized in a fluidized-bed air combustor to Fe 2 O 3 . One advantage of this process is the co-production of hydrogen diluted with water vapor within the steam regenerator. Both the HGD and CLC systems are not under commercial operation so far. This mixture is fed to a gas turbine for the purpose of generating electricity. The gas turbine is expected to exhibit low NO x emissions due to the high ratio of water in the combustion chamber. Cooling the flue gas in the HRSG condenses the water vapor to yield high-purity CO 2 for subsequent compression and disposal. To evaluate the net efficiency, two conventional syngas gasifiers are considered, namely the BGL slagging gasifier and the Shell entrained-flow gasifier. The option of using a CO 2 turbine after the SCL-fuel reactor is also investigated. A sensitivity analysis is performed on the SCL

  14. Heat integration and analysis of decarbonised IGCC sites

    Energy Technology Data Exchange (ETDEWEB)

    Ng, K.S.; Lopez, Y.; Campbell, G.M.; Sadhukhan, J. [University of Manchester, Manchester (United Kingdom). School of Chemical Engineering & Analytical Science

    2010-02-15

    Integrated gasification combined cycle (IGCC) power generation systems have become of interest due to their high combined heat and power (CHP) generation efficiency and flexibility to include carbon capture and storage (CCS) in order to reduce CO{sub 2} emissions. However, IGCC's biggest challenge is its high cost of energy production. In this study, decarbonised coal IGCC sites integrated with CCS have been investigated for heat integration and economic value analyses. It is envisaged that the high energy production cost of an IGCC site can be offset by maximising site-wide heat recovery and thereby improving the cost of electricity (COE) of CHP generation. Strategies for designing high efficiency CHP networks have been proposed based on thermodynamic heuristics and pinch theory. Additionally, a comprehensive methodology to determine the COE from a process site has been developed. In this work, we have established thermodynamic and economic comparisons between IGCC sites with and without CCS and a trade-off between the degree of decarbonisation and the COE from the heat integrated IGCC sites. The results show that the COE from the heat integrated decarbonised IGCC sites is significantly lower compared to IGCC sites without heat integration making application of CCS in IGCC sites economically competitive.

  15. U.S. and Chinese experts perspectives on IGCC technology for Chinese electric power industry

    International Nuclear Information System (INIS)

    Hsieh, B.C.B.; Wang Yingshi

    1997-11-01

    Although China is a very large and populous nation, and has one of the longest known histories in the world, it has only lately begun to seek its place among modern industrial nations. This move, precipitated by the government's relatively recently adopted strategic goals of economic development, societal reform and promotion of engagement with other industrial nations, has brought to the fore the serious situation in which the Chinese electric power industry finds itself. Owing to the advanced average age of generation facilities and the technology used in them, serious expansion and modernization of this industry needs to take place, and soon, if it is to support the rapid industrial development already taking place in China. While China does have some oil and gas, coal constitutes its largest indigenous energy supply, by far. Coal has been mined and utilized for years in China. It is used directly to provide heat for homes, businesses and in industrial applications, and used to raise steam for the generation of electricity. The presently dominant coal utilization methods are characterized by low or marginal efficiencies and an almost universal lack of pollution control equipment. Because there is so much of it, coal is destined to be China's predominant source of thermal energy for decades to come. Realizing these things--the rapidly increasing demand for more electric power than China presently can produce, the need to raise coal utilization efficiencies, and the corresponding need to preserve the environment--the Chinese government moved to commission several official working organizations to tackle these problems

  16. Strategic thinking on IGCC development in China

    International Nuclear Information System (INIS)

    Liu Hengwei; Ni Weidou; Li Zheng; Ma Linwei

    2008-01-01

    With electricity demand growing at a torrid pace-about 15% per year, faster than any other country in the world-China is fast-tracking the construction of new generation facilities, about 80% of which are coal-fired. China's total capacity in the reference scenario of World Energy Outlook 2006 (WEO2006) released by the International Energy Agency (IEA) is projected to practically 3.4 times, from 442 GW in 2004 to 1496 GW in 2030, growing at 4.8% per year on average. The vast majority of this huge generation requirement will still be met through the construction of coal power plants. Because new coal power plants built today have a long life cycle and are not easy to upgrade the technologies involved, decisions made now will have a major impact on the coal utilization mode in the coming years. Thus, the future 20 years is the strategic opportunity period of the transition of conventional coal utilization. Because the Integrated Gasification Combined Cycle (IGCC) can supply electricity, liquid fuels, hydrogen and other chemicals if needed at low pollution level, and has the potential to make carbon capture and sequestration much easier and cheaper than traditional pulverized coal boiler power plants, it should be the strategic direction for China to meet the requirements of the energy and environmental challenges. This paper makes an overview of China's energy and environmental challenges and opportunities, and describes the IGCC technology. It discusses why China should develop IGCC. What are the foundations for China to develop IGCC? What are the rational driving forces to develop IGCC in China? What is the reasonable developing path of IGCC in China?

  17. Green power production by co-gasification of biomass in coal-fired oxygen-blown entrained-flow based IGCC processes

    Energy Technology Data Exchange (ETDEWEB)

    Van Ree, R; Korbee, R; De Smidt, R P; Jansen, D [ECN Fuels Conversion and Environment, Petten (Netherlands); Baumann, H R; Ullrich, N [Krupp Uhde, Dortmund (Germany); Haupt, G; Zimmerman, [Siemens, Erlangen (Germany)

    1998-11-01

    The use of coal for large scale power production meets a growing environmental concern. In spite of the fact that clean coal conversion technologies integrated with high-efficiency power production facilities, such as IGCC, are developed, the aim for sustainable development strives for a power production system based on renewable energy sources. One of the most promising renewable energy sources that can be used in the Netherlands is biomass, i.e. organic waste materials and/or energy crops. To accelerate the introduction of this material, in a technical and economically acceptable way, co-gasification with fossil fuels, in particular coal, in large scale IGCC processes is considered. In this paper the technical feasibility, economic profitability, and environmental acceptability of co-gasification of biomass in coal-fired oxygen-blown entrained-flow based IGM is discussed. Both a base-case coal-fired oxygen-blown entrained-flow based IGCC process - showing strong resemblance to the Puertollano IGCC plant in Spain - and three co-gasification concepts, viz.: (1) a concept with separate dry coal and biomass feeding systems, (2) a concept with a combined dry coal/biomass-derived pyrolysis char feeding system, and (3) a concept with parallel biomass pre-treatment/gasification and combined fuel gas clean-up/power production, were defined for further consideration. The base-case system and the co-gasification concepts as well are modelled in the flowsheet simulation package ASPEN{sup +}. Steady-state integral system calculations resulted in an overall net electrical plant efficiency for the base-case system of 50. 1 %LHV (48.3 %HHV). Replacing about 10 % of the total thermal plant input (coal) by biomass (willow) resulted in a decrease of the overall net electrical plant efficiency of 1.4 to 2.1 %-points LHV, avoided specific CO2 emissions of 40-49 g/kWh{sub e}, and total avoided CO2 emissions of about 129 to 159 kt/a, all depending on the co-gasification concept

  18. Commercialization of IGCC technology looks promising

    International Nuclear Information System (INIS)

    Smith, D.J.

    1992-01-01

    This paper reports that a major focus of the latest round of the U.S. Department of Energy's Clean Coal Technology Program was three large-scale, high-efficiency electricity generating projects which will rely on coal gasification rather than burning the coal directly. The three projects are: Toms Creek integrated gasification combined-cycle (IGCC) demonstration project. The aim of the project is to demonstrate improved coal-to-power efficiencies in an integrated gasification combined-cycle process. According to the DOE, the Toms Creek project will show that significant reductions in SO 2 and NO x emissions can be accomplished through the use of IGCC technology. On completion of the project, 107 MW of electric capacity will be added to the grid. Pinon Pine IGCC power project. The project's aim is to demonstrate that IGCC plants can be constructed at significantly lower capital costs, and with higher thermal efficiencies, than conventional power generation technologies. It will also demonstrate the effectiveness of hot gas cleanup for low-sulfur western coals. Wasbash River coal gasification repowering project

  19. Advanced IGCC/Hydrogen Gas Turbine Development

    Energy Technology Data Exchange (ETDEWEB)

    York, William [General Electric Company, Schenectady, NY (United States); Hughes, Michael [General Electric Company, Schenectady, NY (United States); Berry, Jonathan [General Electric Company, Schenectady, NY (United States); Russell, Tamara [General Electric Company, Schenectady, NY (United States); Lau, Y. C. [General Electric Company, Schenectady, NY (United States); Liu, Shan [General Electric Company, Schenectady, NY (United States); Arnett, Michael [General Electric Company, Schenectady, NY (United States); Peck, Arthur [General Electric Company, Schenectady, NY (United States); Tralshawala, Nilesh [General Electric Company, Schenectady, NY (United States); Weber, Joseph [General Electric Company, Schenectady, NY (United States); Benjamin, Marc [General Electric Company, Schenectady, NY (United States); Iduate, Michelle [General Electric Company, Schenectady, NY (United States); Kittleson, Jacob [General Electric Company, Schenectady, NY (United States); Garcia-Crespo, Andres [General Electric Company, Schenectady, NY (United States); Delvaux, John [General Electric Company, Schenectady, NY (United States); Casanova, Fernando [General Electric Company, Schenectady, NY (United States); Lacy, Ben [General Electric Company, Schenectady, NY (United States); Brzek, Brian [General Electric Company, Schenectady, NY (United States); Wolfe, Chris [General Electric Company, Schenectady, NY (United States); Palafox, Pepe [General Electric Company, Schenectady, NY (United States); Ding, Ben [General Electric Company, Schenectady, NY (United States); Badding, Bruce [General Electric Company, Schenectady, NY (United States); McDuffie, Dwayne [General Electric Company, Schenectady, NY (United States); Zemsky, Christine [General Electric Company, Schenectady, NY (United States)

    2015-07-30

    The objective of this program was to develop the technologies required for a fuel flexible (coal derived hydrogen or syngas) gas turbine for IGCC that met DOE turbine performance goals. The overall DOE Advanced Power System goal was to conduct the research and development (R&D) necessary to produce coal-based IGCC power systems with high efficiency, near-zero emissions, and competitive capital cost. To meet this goal, the DOE Fossil Energy Turbine Program had as an interim objective of 2 to 3 percentage points improvement in combined cycle (CC) efficiency. The final goal is 3 to 5 percentage points improvement in CC efficiency above the state of the art for CC turbines in IGCC applications at the time the program started. The efficiency goals were for NOx emissions of less than 2 ppm NOx (@15 % O2). As a result of the technologies developed under this program, the DOE goals were exceeded with a projected 8 point efficiency improvement. In addition, a new combustion technology was conceived of and developed to overcome the challenges of burning hydrogen and achieving the DOE’s NOx goal. This report also covers the developments under the ARRA-funded portion of the program that include gas turbine technology advancements for improvement in the efficiency, emissions, and cost performance of gas turbines for industrial applications with carbon capture and sequestration. Example applications could be cement plants, chemical plants, refineries, steel and aluminum plants, manufacturing facilities, etc. The DOE’s goal for more than 5 percentage point improvement in efficiency was met with cycle analyses performed for representative IGCC Steel Mill and IGCC Refinery applications. Technologies were developed in this program under the following areas: combustion, larger latter stage buckets, CMC and EBC, advanced materials and coatings, advanced configurations to reduce cooling, sealing and rotor purge flows, turbine aerodynamics, advanced sensors, advancements in first

  20. Thermal and sintering characterization of IGCC slag

    Energy Technology Data Exchange (ETDEWEB)

    Acosta, A.; Iglesias, I.; Aineto, M.; Romero, M.; Rincon, J.M. [University of Castilla La Mancha, Ciudad Real (Spain)

    2002-07-01

    IGCC slag is a vitreous residual product from the new induction gasification combined cycle gasification thermal power plants. In order to characterize this waste as secondary raw material for the production of glasses and glass-ceramics as construction materials, slag from the Puertollano, Ciudad Real, Spain power plants was thermally investigated. After controlled heating this waste gives rise to hematite, anorthite, and cristobalite crystallized materials.

  1. Puertollano IGCC plant. Present position and future competitiveness

    Energy Technology Data Exchange (ETDEWEB)

    Pedro Casero; Francisco Garcia-Pena

    2006-07-01

    This paper discusses the current status of the Puertollano 350 MW IGCC demonstration power plant in Spain. The experience provided by the operation of this plant during the last years is described, focussing on the core systems of the plant (gasifier, gas cleaning and gas turbines). Bottlenecks and weak points related to these systems are identified, along with the improvements. The production of hydrogen from coal at an IGCC plant is also discussed. 9 figs., 2 tabs.

  2. Demonstration of IGCC features - plant integration and syngas combustion

    Energy Technology Data Exchange (ETDEWEB)

    Hannemann, F.; Huth, M.; Karg, J.; Schiffers, U. [Siemens AG Power Generation (KWU), Erlanger/Muelheim (Germany)

    2000-07-01

    Siemens is involved in three IGCC plants in Europe that are currently in operation. Against the background of the Puertollano and Buggenum plants, some of the specific new features of fully integrated IGCC power plants are discussed, including: requirements and design features of the gas turbine syngas supply system; gas turbine operating experience with air extraction for the air separation unit from the gas turbine air compressor; and design requirements and operational features of the combustion system. 7 refs., 17 figs., 1 tab.

  3. Geodetic alignment of laser power installations

    International Nuclear Information System (INIS)

    Shtorm, V.V.; Gostev, A.M.; Drobikov, A.V.

    1989-01-01

    Main problems occuring in applied geodesy under initial alignment of laser power installation optical channel are considered. Attention is paid to alignment of lens beamguide telescopic pairs and alignment quality control. Methods and means of geodetic measurements under alignment are indicated. Conclusions are made about the degree of working through certain aspects of the problem

  4. The slag from ELCOGAS IGCC thermal power plant as raw material for the synthesis of glass-ceramic materials. Part I: Thermal behavior of the IGCC slag and synthesis of the parent glass.

    Energy Technology Data Exchange (ETDEWEB)

    Aineto, M.; Acosta, A. [University of Castilla La Mancha, Ciudad Real (Spain)

    2005-12-01

    We report here the results of the first phase of investigation on the melting behavior of the IGCC slag, and the use of this slag as raw component to produce glass ceramics. The vitrifying mixture named ECSCP, is composed of 40% slag, 30% glass cullet and 30% precipitated calcium carbonate obtained as a by-product in a sugar refining plant. This mixture was melted at 1450{sup o}C to obtain the ECSCP parent glass, that was then characterized and its crystallization kinetics studied by thermal analysis. The ECSCP glass exhibit a surface mechanism of crystallization, and will be used to produce anorthite/wollastonite glass ceramics in the second part of the investigation.

  5. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  6. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  7. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  8. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  9. Exhaust circulation into dry gas desulfurization process to prevent carbon deposition in an Oxy-fuel IGCC power generation

    International Nuclear Information System (INIS)

    Kobayashi, Makoto; Nakao, Yoshinobu; Oki, Yuso

    2014-01-01

    Highlights: • Power plant with semi-closed gas turbine and O 2 –CO 2 coal gasifier was studied. • We adopt dry gas sulfur removal process to establish the system. • The exhaust gas circulation remarkably prevented carbon deposition. • Efficiency loss for exhaust gas circulation is quite small. • Appropriate operating condition of sulfur removal process is revealed. - Abstract: Semi-closed cycle operation of gas turbine fueled by oxygen–CO 2 blown coal gasification provides efficient power generation with CO 2 separation feature by excluding pre-combustion type CO 2 capture that usually brings large efficiency loss. The plant efficiency at transmission end is estimated as 44% at lower heating value (LHV) providing compressed CO 2 with concentration of 93 vol%. This power generation system will solve the contradiction between economical resource utilization and reduction of CO 2 emission from coal-fired power plant. The system requires appropriate sulfur reduction process to protect gas turbine from corrosion and environment from sulfur emission. We adopt dry gas sulfur removal process to establish the system where apprehension about the detrimental carbon deposition from coal gas. The effect of circulation of a portion of exhaust gas to the process on the retardation of carbon deposition was examined at various gas compositions. The circulation remarkably prevented carbon deposition in the sulfur removal sorbent. The impact of the circulation on the thermal efficiency is smaller than the other auxiliary power consumption. Thus, the circulation is appropriate operation for the power generation

  10. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  11. IGCC based on proven technology developing towards 50% efficiency mark

    Energy Technology Data Exchange (ETDEWEB)

    Goudappel, E.; Berkhout, M. [Jacobs Consultancy, Leiden (Netherlands)

    2006-07-01

    In this paper the achievements made over the last 10 years in terms of reliability, load following and efficiency improvement potential at the Buggenum IGCC plant, are presented. Also the air side heat integration and its pros and cons are discussed. Additionally future business opportunities adjacent to the power production itself and the view on coal gasification in the near future are provided. The results are discussed and it is shown that with 'proven' gasifier and gas treatment technology, overall efficiency exceeding 47% (LHV basis) can be reached. It puts this technical potential in perspective and describes the view on interesting business opportunities around IGCC projects. 5 figs., 3 tabs.

  12. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  13. Advanced IGCC-Hypogen concepts for a developing hydrogen market

    Energy Technology Data Exchange (ETDEWEB)

    Starr, F.; Cormos, C.-C.; Tzimas, E.; Brown, A. [European Commission, Petten (Netherlands). DG Joint Research Centre, Institute for Energy

    2007-07-01

    With FP6 the EU is funding a project called 'Dynamis' which aims to design plants to generate electricity, plus a limited amount of hydrogen from fossil fuels, in which the CO{sub 2} is captured and stored underground. Such plants have been characterised as being of the 'HYPOGEN' type since they generate both hydrogen and electric power. As the hydrogen market develops IGCC-Hypogen based systems will need to produce much greater amounts of hydrogen. It is also desirable that such plants should be able to vary the proportion of hydrogen-to-electricity. This will enable IGCC-Hypogen plants to load follow and two-shift as electricity demand from the grid changes. Such variations in power output are not always practical with existing designs of electricity-only IGCCs. This paper reviews the technical issues involved in providing a high-flexibility IGCC-Hypogen plant. Three such concepts are discussed (1) very limited flexibility in which the changes from a fixed hydrogen-electricity ratio concept are minor, (2) moderate level of flexibility in which the limit is imposed by the CCGT gas turbine turndown (3) complete flexibility, the plant being able produce the energy as all-electricity or all-hydrogen. 9 refs., 2 figs., 1 tab.

  14. THERMAL AND SINTERING CHARACTERIZATION OF A IGCC SLAG

    OpenAIRE

    Acosta, Anselmo; Iglesias, Isabel; Aineto, Mónica; Romero, Maximina; Rincón López, Jesús María

    2002-01-01

    IGCC slag is a vitreous residual product from the new induction gasification combined cycle gasification thermal power plants. In order to characterize this waste as secondary new material for the production of new glasses and glass-ceramics as construction materials; this slag from the Puertollano, Ciudad Real, Spain power plants has been fully thermally investigated. After controlled heating this waste gives rise to hematite, anorthite, and cristobalite crystallized materials.

  15. The future of integrated coal gasification combined cycle power plants

    International Nuclear Information System (INIS)

    Mueller, R.; Termuehlen, H.

    1991-01-01

    This paper examines the future of integrated coal gasification combined cycle (IGCC) power plants as affected by various technical, economical and environmental trends in power generation. The topics of the paper include a description of natural gas-fired combined cycle power plants, IGCC plants, coal gasifier concepts, integration of gasifiers into combined cycle power plants, efficiency, environmental impacts, co-products of IGCC power plants, economics of IGCC power plants, and a review of IGCC power plant projects

  16. Regulations of local choices for installation of power reactors

    International Nuclear Information System (INIS)

    1969-09-01

    The present regulations specify the criteria under which the Comissao Nacional de Energia Nuclear will approve the local proposed for the installation of power reactors, according to his attributions established in the Law 4118, dated of August 27, 1962

  17. Legal bases for the installation of nuclear power plants

    International Nuclear Information System (INIS)

    Faria, N.M. de

    1980-06-01

    The process of installation of nuclear power plants in the context of the Brazilian legal system is analysed. The structure of the political and administrative system related to the matter and the correspondent legislation are discussed. (A.L.) [pt

  18. Legal bases for the installation of nuclear power plants

    International Nuclear Information System (INIS)

    Faria, N.M. de; Barros, E.A.

    1980-01-01

    The role of the National Nuclear Energy Comission, the National Department of Water and Electrical Energy and the 'Centrais Eletricas Brasileiras S.A.' for the installation of Nuclear Power Plants is presented. (A.L.) [pt

  19. Air toxics emissions from an IGCC process

    Energy Technology Data Exchange (ETDEWEB)

    Mojtahedi, W.; Norrbacka, P. [Enviropower Inc., Espoo (Finland); Hinderson, A. [Vattenfall (Sweden); Rosenberg, R.; Zilliacus, R.; Kurkela, E.; Nieminen, M. [VTT Energy, Espoo (Finland); Hoffren, H. [IVO International Oy, Vantaa (Finland)

    1996-12-01

    The so-called simplified coal gasification combined cycle process, incorporating air gasification and hot gas cleanup, promises high power generation efficiency in an environmentally acceptable manner. Increasingly more stringent environmental regulations have focused attention on the emissions of not only SO{sub 2} and NO{sub x} but also on the so-called air toxics which include a number of toxic trace elements. As result of recent amendments to the United States Clean Air Act, IGCC emissions of eleven trace elements: antimony, arsenic, beryllium, cadmium, chromium, cobalt, lead, manganese, mercury, nickel, selenium - as well as the radionuclides uranium and thorium may be regulated. Similarly, air missions standards in Europe include a limit of 0.05 mg Nm{sup 3} for mercury and cadmium and 1.0 3/Nm{sup 3} for other class I trace elements. A suitable sampling/measuring system has been developed in this project (in cooperation with Imatran Voima Oy, Electric Power Research Institute (EPRI) and Radian Cooperation) which will be used in the pressurized gasification tests. This will enable an accurate measurement of the volatilized trace element species, at high temperature and pressure, which may be found in the vapour phase. Models are being developed that can be used to determine not only the chemical equilibrium composition of gaseous, liquid and solid phases, but also possible interactions of the gaseous species with aerosol particles and surfaces, These should be used to more accurately assess the impact of the toxic trace metals emitted from the simplified IGCC system

  20. Amine-based post-combustion CO2 capture in air-blown IGCC systems with cold and hot gas clean-up

    International Nuclear Information System (INIS)

    Giuffrida, A.; Bonalumi, D.; Lozza, G.

    2013-01-01

    Highlights: • Hot fuel gas clean-up is a very favorable technology for IGCC concepts. • IGCC net efficiency reduces to 41.5% when realizing post-combustion CO 2 capture. • Complex IGCC layouts are necessary if exhaust gas recirculation is realized. • IGCC performance does not significantly vary with exhaust gas recirculation. - Abstract: This paper focuses on the thermodynamic performance of air-blown IGCC systems with post-combustion CO 2 capture by chemical absorption. Two IGCC technologies are investigated in order to evaluate two different strategies of coal-derived gas clean-up. After outlining the layouts of two power plants, the first with conventional cold gas clean-up and the second with hot gas clean-up, attention is paid to the CO 2 capture station and to issues related to exhaust gas recirculation in combined cycles. The results highlight that significant improvements in IGCC performance are possible if hot coal-derived gas clean-up is realized before the syngas fuels the combustion turbine, so the energy cost of CO 2 removal in an amine-based post-combustion mode is less strong. In particular, IGCC net efficiency as high as 41.5% is calculated, showing an interesting potential if compared to the one of IGCC systems with pre-combustion CO 2 capture. Thermodynamic effects of exhaust gas recirculation are investigated as well, even though IGCC performance does not significantly vary against a more complicated plant layout

  1. Assessment of oxy-fuel, pre- and post-combustion-based carbon capture for future IGCC plants

    International Nuclear Information System (INIS)

    Kunze, Christian; Spliethoff, Hartmut

    2012-01-01

    Highlights: ► Hot gas cleanup is a highly favorable technology for all selected IGCC concepts. ► Proposed high pressure IGCC with membrane reactor enables direct CO 2 condensation. ► IGCC with OTM and carbonate looping enable significant synergy effects. ► Combining IGCC and oxy-fuel is technically challenging but energetically favorable. ► All selected IGCC concepts are able to realize CO 2 capture rates up to 99%. -- Abstract: Environmental damage due to the emission of greenhouse gases from conventional coal-based power plants is a growing concern. Various carbon capture strategies to minimize CO 2 emissions are currently being investigated. Unfortunately, the efficiency drop due to de-carbonization is still significant and the capture rate is limited. Therefore three future hard coal IGCC concepts are assessed here, applying emerging technologies and various carbon capture approaches. The advanced pre-combustion capture concept is based on hot gas clean-up, membrane-enhanced CO conversion and direct CO 2 condensation. The concept reached a net efficiency of 45.1% (LHV), representing an improvement of 6.46% compared to the conventional IGCC base case. The second IGCC concept, based on post-combustion capture via calcination–carbonation loops, hot gas clean-up and oxygen membranes, showed a net efficiency of 45.87% (LHV). The third IGCC concept applies hot gas clean-up and combustion of the unconverted fuel gas using pure oxygen. The oxygen is supplied by an integrated oxygen membrane. The combination of IGCC and oxy-fuel process reached a net efficiency of 45.74% (LHV). In addition to their increased efficiency, all of the concepts showed significantly improved carbon capture rates up to 99%, resulting in virtually carbon-free fossil power plants.

  2. Survey, design, development, and installation of micro hydel power generation

    International Nuclear Information System (INIS)

    Ijaz, M.

    2011-01-01

    This paper presents the survey, design, development and installation Of micro hydel power generation using low head Kaplan water turbine. Electricity production from hydro power has been and still is today, the first renewable source used to generate electricity. The development of energy from renewable is very important step in reduction of carbon emissions(CO/sub 2/).

  3. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  4. Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2005-12-01

    turbine combustion systems. This task was refocused to address pre-mixed combustion phenomenon for IGCC applications. The work effort on this task was shifted to another joint GE Energy/DOE-NETL program investigation, High Hydrogen Pre-mixer Designs, as of April 1, 2004. Task 4--Information Technology (IT) Integration: The fourth task was originally to demonstrate Information Technology (IT) tools for advanced technology coal/IGCC powerplant condition assessment and condition based maintenance. The task focused on development of GateCycle. software to model complete-plant IGCC systems, and the Universal On-Site Monitor (UOSM) to collect and integrate data from multiple condition monitoring applications at a power plant. The work on this task was stopped as of April 1, 2004.

  5. VG-400 atomic power and technological installation. Possible core design

    International Nuclear Information System (INIS)

    Komarov, E.V.; Laptev, F.V.; Lyubivyj, A.G.; Mitenkov, F.M.; Samojlov, O.B.; Sukhachevskij, Yu.B.

    1979-01-01

    The main characteristics, basic circuit and configuration of equipment of the VG-400 atomic power and technological installation are considered. This installation is intended for supplying with highly-potential heat of thermal electrochemical hydrogen production and for power generation in the steam-turbine cycle. The main installation characteristics: HTGR reactor heat power 1100 MW, electric power 300 MW, helium coolant pressure 50 atm, output temperature 950 deg C, steam pressure in the second contour 175 atm, temperature 535 deg C, core diameter and height 6.4 m and 4 m, respectively, number of spherical fuel elements 8.5x10 5 . The installation can ensure hydrogen production of 10 5 Nxm 3 /h. For the VG-400 reactor block the integral arrangement of the first circuit equipment in the reinforced concrete is chosen. Two versions of the reactor core with prismatic and spherical fuel elements are compared. It is shown that taking into account great potentialities of the spherical zone in a case of further temperature increase and its positive qualities with respect to construction and processing of fuel elements and graphite blocks, the utilization of simplier units and mechanisms in the overloading system and in the process of profiling of energy distribution the choice of the spherical configuration for the VG-400 pilot plant installation seems to be valid

  6. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. (Parsons (United Kingdom))

    1998-01-01

    The technology for recovering elemental sulphur from H[sub 2]S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H[sub 2]S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  7. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. [Parsons (United Kingdom)

    1998-12-31

    The technology for recovering elemental sulphur from H{sub 2}S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H{sub 2}S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  8. Spallation Neutron Source High Power RF Installation and Commissioning Progress

    CERN Document Server

    McCarthy, Michael P; Bradley, Joseph T; Fuja, Ray E; Gurd, Pamela; Hardek, Thomas; Kang, Yoon W; Rees, Daniel; Roybal, William; Young, Karen A

    2005-01-01

    The Spallation Neutron Source (SNS) linac will provide a 1 GeV proton beam for injection into the accumulator ring. In the normal conducting (NC) section of this linac, the Radio Frequency Quadupole (RFQ) and six drift tube linac (DTL) tanks are powered by seven 2.5 MW, 402.5 MHz klystrons and the four coupled cavity linac (CCL) cavities are powered by four 5.0 MW, 805 MHz klystrons. Eighty-one 550 kW, 805 MHz klystrons each drive a single cavity in the superconducting (SC) section of the linac. The high power radio frequency (HPRF) equipment was specified and procured by LANL and tested before delivery to ensure a smooth transition from installation to commissioning. Installation of RF equipment to support klystron operation in the 350-meter long klystron gallery started in June 2002. The final klystron was set in place in September 2004. Presently, all RF stations have been installed and high power testing has been completed. This paper reviews the progression of the installation and testing of the HPRF Sys...

  9. Studies of works management and automation of nuclear power installations

    International Nuclear Information System (INIS)

    Besch, P.; Grossmann, J.; Hollasky, R.

    1989-01-01

    Erection and operation of nuclear power installations require investigations on their safety and availability. The works performed on the management of nuclear power plants and nuclear heating stations in the Working Group on Automation Engineering of the Dresden University of Technology are presented. Emphasis of the works is on simulation of dynamical performance of the plants and studies on the utilization of novel techniques concerning plant automation and process management. (author)

  10. Power Quality Issues on Wind Power Installations in Denmark

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Lund, Torsten

    2007-01-01

    offshore wind farms connected at transmission level. In this perspective, the power quality issues are divided into local issues particularly related to the voltage quality in the distribution systems and global issues related to the power system control and stability. Power quality characteristics of wind...

  11. Institutional support to the nuclear power based on transportable installations

    International Nuclear Information System (INIS)

    Kuznetsov, V.P.; Cherepnin, Y.S.

    2010-01-01

    Existing nuclear power uses large-power nuclear plants (more than 1,000 MWe) and enriched uranium fuel ( 2 35 U ). Each plant is treated as an exclusive costly project. As a result, large NPPs are operated predominantly in highly developed big countries. In many countries, construction of large power units is not reasonable because of the economic conditions and national specifics. This calls for the use of small- and medium-power nuclear plants (SMPNP), especially transportable nuclear installations (TNI). TNI feature small power (up to 100 MWe); serial production, and transportability. Small- and medium-power nuclear plants could serve to produce electricity and heat; perform water desalination; provide temporary and emergency energy supply. The authors discuss some findings of the studies carried out on the various aspects of the TNI life, as well as the legal and institutional support to their development, construction and operation. The studies have been performed in the framework of the INPRO Action Plan

  12. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  13. Quality assurance in the structural installations of nuclear power stations

    International Nuclear Information System (INIS)

    Schnellenbach, G.; Wrage, S.

    1985-01-01

    The concept of quality assurance distinguishes between self-monitoring of the design, manufacturing and executing firms and external monitoring by state institutions or by experts commissioned by them. The long-term control of structures is within the area of responsibility of the owner. This quality assurance concept is controlled in detail by statutes, which clearly define responsibilities. This structural engineering quality assurance system also forms the basis for the design, construction and utilization of structural installations of nuclear power stations; requirements emanating from the Atomic Energy Acts for the structural installations demand, however, to some extent a sharpening of self- and external monitoring. Therefore, today a quality concept has been developed for the important engineering safety-related buildings of nuclear power stations. This concept takes account of the strict requirements imposed and fulfils the requirement of KTA 1401. (orig.) [de

  14. Zinc Bromide Flow Battery Installation for Islanding and Backup Power

    Science.gov (United States)

    2017-08-09

    demonstrates the energy security and cost benefits of implementing a Zn/Br Flow Battery-based ESS at the Marine Corps Air Station (MCAS) located at...user will be realized through the system’s peak shaving mode. This benefit was also used to calculate the operational cost reductions when using the...EW-201242) Zinc Bromide Flow Battery Installation for Islanding and Backup Power August 2017 This document has been cleared for public release

  15. IGCC - fuel-flexible technology for the future

    Energy Technology Data Exchange (ETDEWEB)

    Karg, J.; Hannemann, F. [Siemens AG Power Generation, Erlangen (Germany)

    2004-07-01

    According to IEA's World Energy Investment Outlook 2003 the electricity sector will dominate with about 60% of the total investment requirements expected until 2030 for worldwide energy-supply infrastructure. Around 45% of the capital needed for the electricity sector will be for power generation. The investment will be needed for capacity additions and to replace existing older facilities. According to the estimates the global primary energy demand is projected to grow by two thirds over the next three decades and electricity demand is expected to double by 2030. The natural gas for power generation is projected to increase significantly, but coal will remain the largest source of electricity generation throughout the projection period. These trends must be seen against the background that environmental regulations, are becoming tighter, and that environmental legislation will increasingly address greenhouse gas emissions. The necessity for more efficient use of primary energies in combination with more stringent environmental regulations for fossil-fuelled power plants therefore pushes concepts with increased efficiencies and reduced CO{sub 2} emissions, respectively. Since significant reduction of CO{sub 2} emissions cannot only be achieved via increased efficiencies or application of fuels with low carbon content, CO{sub 2} removal options also need to be considered for future power plant configurations. Considering this, IGCC is again one of the most promising solutions which are of relevance in this context. However, these new IGCC applications require further overall a plant concept and component development efforts. One essential step for performance improvement of future IGCC applications is to further develop syngas capabilities of advanced gas turbines, thereby considering the experience and lessons learned from operational plants. 11 refs., 7 figs., 5 tabs.

  16. Gas turbine installations in nuclear power plants in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Sevestedt, Lars [Electrical Equipment and Gas Turbines, Swedish State Power Board, Ringhals Nuclear Power Plant, S-430 22 Vaeroebacka (Sweden)

    1986-02-15

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  17. Gas turbine installations in nuclear power plants in Sweden

    International Nuclear Information System (INIS)

    Sevestedt, Lars

    1986-01-01

    At each of the four nuclear power stations in Sweden (Ringhals, Forsmark, Oskarshamn, Barsebaeck) gas turbine generating sets have been installed. These units are normally used for peak load operation dictated of grid and System requirements but they are also connected to supply the electrical auxiliary load of the nuclear plant as reserve power sources. The gas turbines have automatic start capability under certain abnormal conditions (such as reactor trips, low frequency grid etc) but they can also be started manually from several different locations. Starting time is approximately 2- 3 minutes from start up to full load. (author)

  18. Water and power installation for Lanzarote (Canary Islands) Spain

    Energy Technology Data Exchange (ETDEWEB)

    Krebs, F.

    1977-03-01

    Water producing and electrical generating facilities had to be increased on the Spanish Canary Island of Lanzarote for it to develop beyond its 1972 status. The Ministry of Public Works, prepared specifications for a turnkey installation of two 2500 M/sup 3//D desalting plants and a 5 MW (net) generating system. In 1973 through international competition Babcock and Wilcox, Espanola won a contract to build the installation. In December 1975 the construction of the project was completed. In early January 1976 the first line was producing 103% of the rated production at a thermal efficiency of 120% of the rated value. The second line was modified to operate at a reduced maximum brine temperature and commissioned. This plant was brought to full production which was 115% of the rated production in 2/sup 1///sub 2/ days. Problems and delays during the commissioning, were minimal. A 5 days performance test of the installation was run. During this test the water production was 111/sup 1///sub 2/% of the rated value at a specific energy consumption of 93% of the rated value while the maximum brine temperature was maintained 6/sup 0/C less than the design value. The high performances were achieved because the plants were well designed and built and properly commissioned. During the first 4/sup 1///sub 2/ months that the owner operated the installation it provided water and power as demanded. During that time the average plant production was 107% of the rated capacity.

  19. Briefing Book, Interagency Geothermal Coordinating Council (IGCC) Meeting of April 28, 1988

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-04-28

    The IGCC of the U.S. government was created under the intent of Public Law 93-410 (1974) to serve as a forum for the discussion of Federal plans, activities, and policies that are related to or impact on geothermal energy. Eight Federal Departments were represented on the IGCC at the time of this meeting. The main presentations in this report were on: Department of Energy Geothermal R&D Program, the Ormat binary power plant at East Mesa, CA, Potential for direct use of geothermal at Defense bases in U.S. and overseas, Department of Defense Geothermal Program at China Lake, and Status of the U.S. Geothermal Industry. The IGCC briefing books and minutes provide a historical snapshot of what development and impact issues were important at various time. (DJE 2005)

  20. Procedures for permission of installation of nuclear power stations

    International Nuclear Information System (INIS)

    Narita, Yoriaki

    1980-01-01

    The locations of atomic power stations are first selected by electric power enterprises in consultation with the Ministry of International Trade and Industry or under the guidance of authorities concerned. The surveys of the climate, topography, water and plants in the planned sites and the influences of nuclear power generation to the surrounding areas are made by the enterprisers under the administrative guidance of the MITI. Secondly, the basic project shall be submitted to and decided by the Power Resource Development Council headed by the Prime Minister (Article 10, the Power Resource Development Law). The Council shall, if necessary, call for the attendance of the governors of prefectures concerned and hear their opinions (Article 11, the Law). As the third and most complicated phase, various procedures include; (a) permission of the changes of electrical facilities under the Electricity Enterprises Act; (b) authorization of the installation of reactors under the Nuclear Reactor Regulation Law; (c) permission or authorization under other regulations including the Agricultural Land Act, etc.; (d) additional procedures related to the indemnification to fishery and so forth. Finally the reactors are to be operated after receiving the certificates of the Minister of ITI on the inspections of construction works, nuclear fuel materials used for the reactors and welding processes of reactor containment vessels, boilers, turbines, etc. (Okada, K.)

  1. CCS Retrofit: Analysis of the Global Installed Power Plant Fleet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    Electricity generation from coal is still growing rapidly and energy scenarios from the IEA expect a possible increase from today’s 1 600 GW of coal-fired power plants to over 2 600 GW until 2035. This trend will increase the lock-in of carbon intensive electricity sources, while IEA assessments show that two-thirds of total abatement from all sectors should come from the power sector alone to support a least-cost abatement strategy. Since coal-fired power plants have a fairly long lifetime, and in order to meet climate constraints, there is a need either to apply CCS retrofit to some of today’s installed coal-fired power plants once the technology becomes available. Another option would be to retire some plants before the end of their lifetime. This working paper discusses criteria relevant to differentiating between the technical, cost-effective and realistic potential for CCS retrofit. The paper then discusses today’s coal-fired power plant fleet from a statistical perspective, by looking at age, size and the expected performance of today’s plant across several countries. The working paper also highlights the growing demand for applying CCS retrofitting to the coal-fired power plant fleet of the future. In doing so this paper aims at emphasising the need for policy makers, innovators and power plant operators to quickly complete the development of the CCS technology and to identify key countries where retrofit applications will have the biggest extent and impact.

  2. Outline of additional installation works in Oi Nuclear Power Station

    International Nuclear Information System (INIS)

    Shibata, Atsuo; Matsuoka, Motokazu

    1987-01-01

    At present in Oi Nuclear Power Station, Kansai Electric Power Co., Inc., No.1 and No.2 plants of 1175 MWe each are in operation. In order to stabilize power supply for a long term, the additional installation of No.3 and No.4 plants of 1180 MWe each is in progress. The No.3 and No.4 plants are PWRs, for which prestressed concrete reactor containment vessels were adopted, and the start of operation is scheduled in October, 1991 in No.3 plant and in August, 1992 in No.4 plant. In the execution of main construction works, the preservation of the existing plants is the most important. For excavating the tunnels for seawater channels, tunnel boring machines were used, to avoid blasting. Pneumatic caisson method was adopted for a part of the circulating pump building. No vibration, no noise piling method was adopted for respective sheathing construction. The blasting vibration control in the excavation for foundations and the analysis of the behavior of retaining walls are to be carried out by information-oriented work execution. The outline of the main construction works and the preservation of the existing facilities are reported. (Kako, I.)

  3. CERAMIC MEMBRANE ENABLING TECHNOLOGY FOR IMPROVED IGCC EFFICIENCY

    International Nuclear Information System (INIS)

    Ravi Prasad

    2000-01-01

    The objective of this program is to conduct a technology development program to advance the state-of-the-art in ceramic Oxygen Transport Membranes (OTM) to the level required to produce step change improvements in process economics, efficiency, and environmental benefits for commercial IGCC systems and other applications. The IGCC program is focused on addressing key issues in materials, processing, manufacturing, engineering and system development that will make the OTM a commercial reality. The objective of the OTM materials development task is to identify a suitable material that can be formed into a thin film to produce the target oxygen flux. This requires that the material have an adequate permeation rate, and thermo-mechanical and thermo-chemical properties such that the material is able to be supported on the desired substrate and sufficient mechanical strength to survive the stresses involved in operation. The objective of the composite OTM development task is to develop the architecture and fabrication techniques necessary to construct stable, high performance, thin film OTMs supported on suitable porous, load bearing substrates. The objective of the process development task of this program to demonstrate the program objectives on a single OTM tube under test conditions simulating those of the optimum process cycle for the power plant

  4. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.680 Installation of wiring for power...

  5. ConocoPhillips Sweeny IGCC/CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Talarico; Charles Sugg; Thomas Hren; Lauri Branch; Joseph Garcia; Alan Rezigh; Michelle Pittenger; Kathleen Bower; Jonathan Philley; Michael Culligan; Jeremy Maslen; Michele Woods; Kevin Elm

    2010-06-16

    Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process

  6. Commercial gasifier for IGCC applications study report

    Energy Technology Data Exchange (ETDEWEB)

    Notestein, J.E.

    1990-06-01

    This was a scoping-level study to identify and characterize the design features of fixed-bed gasifiers appearing most important for a gasifier that was to be (1) potentially commercially attractive, and (2) specifically intended for us in integrated coal gasification/combined-cycle (IGCC) applications. It also performed comparative analyses on the impact or value of these design features and on performance characteristics options of the whole IGCC system since cost, efficiency, environmental traits, and operability -- on a system basis -- are what is really important. The study also reviewed and evaluated existing gasifier designs, produced a conceptual-level gasifier design, and generated a moderately advanced system configuration that was utilized as the reference framework for the comparative analyses. In addition, technical issues and knowledge gaps were defined. 70 figs., 31 tabs.

  7. Api Energia IGCC plant is fully integrated with refinery

    Energy Technology Data Exchange (ETDEWEB)

    Del Bravo, R. [api Energia, Rome (Italy); Trifilo, R. [ABB Sadelmi, Milan (Italy); Chiantore, P.V. [api anonima petroli Italiania Spa, Rome (Italy); Starace, F. [ABB Power Generation, Baden (Switzerland); O`Keefe, L.F. [Texico, White Plains (United States)

    1998-06-01

    The api Energia integrated gasification combined cycle (IGCC) plant being built at Falconara Marittima, on Italy`s Adriatic coast, is one of the three IGCC plants under construction in Italy following the liberalization of the electricity production sector. The plant will take 59.2 t/h of high sulphur heavy oil produced by the Falconara refinery, convert it to syngas and use the gas to generate 280 MW of electricity, plus steam and other gases for use in the refinery. The IGCC plant will be highly integrated into the refining process, with a large number of interchanges between the IGCC unit and the rest of the refinery. (author)

  8. Investigation And Mitigation Techniques Of Power Quality Problems In Nuclear Installations

    International Nuclear Information System (INIS)

    Ayad, N.; Elsherbiny, E.; Eleissawi, H.; Zaher, M.; AbdelSalam, G.

    2013-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Investigation and monitoring of power quality is necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. The present research discusses investigation and monitoring of power quality problems for the electrical sources of nuclear installations. Field power quality data is collected by power analyzer and analyzed with reference to power quality standards. There were several disturbances exceeded the thresholds, they were voltage harmonics and voltage flicker. Mitigation techniques were suggested to install a passive filter at low voltage side and all sensitive and critical loads should be isolated and fed through uninterruptible power supply (UPS)

  9. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  10. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...

  11. The United States of America and the People`s Republic of China experts report on integrated gasification combined-cycle technology (IGCC)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    A report written by the leading US and Chinese experts in Integrated Gasification Combined Cycle (IGCC) power plants, intended for high level decision makers, may greatly accelerate the development of an IGCC demonstration project in the People`s Republic of China (PRC). The potential market for IGCC systems in China and the competitiveness of IGCC technology with other clean coal options for China have been analyzed in the report. Such information will be useful not only to the Chinese government but also to US vendors and companies. The goal of this report is to analyze the energy supply structure of China, China`s energy and environmental protection demand, and the potential market in China in order to make a justified and reasonable assessment on feasibility of the transfer of US Clean Coal Technologies to China. The Expert Report was developed and written by the joint US/PRC IGCC experts and will be presented to the State Planning Commission (SPC) by the President of the CAS to ensure consideration of the importance of IGCC for future PRC power production.

  12. Limitation of fusion power plant installation on future power grids under the effect of renewable and nuclear power sources

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Shutaro, E-mail: takeda.shutarou.55r@st.kyoto-u.ac.jp [Graduate School of Advanced Integrated Studies in Human Survivability, Kyoto University, Kyoto, Kyoto (Japan); Sakurai, Shigeki [Graduate School of Advanced Integrated Studies in Human Survivability, Kyoto University, Kyoto, Kyoto (Japan); Yamamoto, Yasushi [Faculty of Engineering Science, Kansai University, Suita, Osaka (Japan); Kasada, Ryuta; Konishi, Satoshi [Institute of Advanced Energy, Kyoto University, Uji, Kyoto (Japan)

    2016-11-01

    Graphical abstract: - Highlights: • Future power grids would be unstable due to renewable and nuclear power sources. • Output interruptions of fusion plant would cause disturbances to future grids. • Simulation results suggested they would create limitations in fusion installation. • A novel diagram was presented to illustrate this suggested limitation. - Abstract: Future power grids would be unstable because of the larger share of renewable and nuclear power sources. This instability might bring some additional difficulties to fusion plant installation. Therefore, the authors carried out a quantitative feasibility study from the aspect of grid stability through simulation. Results showed that the more renewable and nuclear sources are linked to a grid, the greater disturbance the grid experiences upon a sudden output interruption of a fusion power plant, e.g. plasma disruption. The frequency deviations surpassed 0.2 Hz on some grids, suggesting potential limitations of fusion plant installation on future grids. To clearly show the suggested limitations of fusion plant installations, a novel diagram was presented.

  13. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  14. Water-gas shift (WGS) Operation of Pre-combustion CO2 Capture Pilot Plant at the Buggenum IGCC

    NARCIS (Netherlands)

    Van Dijk, H.A.J.; Damen, K.; Makkee, M.; Trapp, C.

    2014-01-01

    In the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was built and operated at the Buggenum IGCC power plant, the Netherlands. The pilot consist of sweet water-gas shift, physical CO2 absorption and CO2 compression. The technology performance was verified and

  15. Techno-economic analysis of lignite fuelled IGCC with CO{sub 2} capture. Comparing fluidized bed and entrained flow gasifiers

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guangjian; Wu, Zhen; Zhang, Haiying [North China Electric Power Univ., Beijing (China). School of Energy and Power Engineering

    2013-07-01

    Integrated coal gasification combined cycle (IGCC) plants with pre-combustion capture of CO{sub 2} represent one of the most promising options for generating low-cost decarbonized power using bituminous coals. This work systematically quantify the effect of coal rank on the efficiency and economics of IGCC systems with CO2 capture and storage (CCS), with a special focus on comparison of systems using fluidized-bed gasifier (U-GAS) and entrained flow gasifier (Shell). It was found that the Shell IGCCs are little affect by low rank coal after pre-drying in terms of thermal efficiency and the levelized cost of electricity (LCOE) is only increase by 2-6% for lignite cases with and without CCS compared with bituminous coal cases. The specific CO{sub 2} emissions of U-GAS gasifier based lignite fuelled IGCC with CCS is 198 g/kWhe, almost two times of shell gasifier cases, mainly due to lower carbon conversion in the gasifier and the higher methane in the raw gas of gasifier. However, the total capital cost and COE of U-Gas IGCCs are 15-20% less than that of Shell IGCCs because of lower capital cost of gasifier, coal drying units and air separate units per kWe.

  16. Power Consumption Analysis of Electrical Installations at Healthcare Facility

    Directory of Open Access Journals (Sweden)

    Emmanuel Guillen-Garcia

    2017-01-01

    Full Text Available This paper presents a methodology for power consumption estimation considering harmonic and interharmonic content and then it is compared to the power consumption estimation commonly done by commercial equipment based on the fundamental frequency, and how they can underestimate the power consumption considering power quality disturbances (PQD. For this purpose, data of electrical activity at the electrical distribution boards in a healthcare facility is acquired for a long time period with proprietary equipment. An analysis in the acquired current and voltage signals is done, in order to compare the power consumption centered in the fundamental frequency with the generalized definition of power consumption. The results obtained from the comparison in the power consumption estimation show differences between 4% and 10% of underestimated power consumption. Thus, it is demonstrated that the presence of harmonic and interharmonic content provokes a significant underestimation of power consumption using only the power consumption centered at the fundamental frequency.

  17. The ''Dolphin'' power laser installation for spherical thermonuclear target heating

    International Nuclear Information System (INIS)

    Basov, N.G.; Bykovskij, N.E.; Danilov, A.E.

    1978-01-01

    12-channel laser installation the ''Dolphin'' for thermonuclear target heating in the radiation spheric geometry has been developed to carry out series of physical investigations of laser-thermonuclear plasma system, optimization of target heating conditions and obtaining a comparatively large value of thermonuclear output in ratio to the energy of absorbed light radiation in the target. The description of installation main elements, consisting of the following components, is given: 1)neodymium laser with the maximum permissible radiation energy of 10kJ, with light pulse duration of 10 -10 /10 -9 c and radiation divergence of approximately 5x10 -4 rad; 2)vacuum chamber, where laser radiation interaction with plasma takes place; 3)diagnostic means of laser and plasma parameters and 4)focus system. The focus system provides a high degree of target spherical radiation symmetry at current maximum density on its surface of approximately 10 15 W/cm 2

  18. Power supply regulation systems installed in the Fermilab accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Hays, S.; Wolff, D.; Pfeffer, H.

    1991-11-01

    A variety of current and voltage regulation systems have been installed in the Fermilab large magnet system. The four major systems employ different methods to achieve the desired degree of regulation. The methods include computer control and feedback, adaptive learning, precision (10ppm) current monitoring, and the use of feed-forward signals. This paper will explain each method used and present the measured regulation of the above systems. Also an overview of planned upgrades and improvements will be presented.

  19. Grid-Parity Solar Power for Department of Defense Installations

    Science.gov (United States)

    2014-02-01

    possible without running additional cables back to the inverter . The panel array length is calculated by dividing the panels’ system voltage by its...components ( solar panels, mounting, cabling, inverters , and other Balance of Systems (BoS) equipment), installation, operations and maintenance...LCOE is the PV Plant System Economics metric, as described in b), below. However, LCOE computed inclusive of tax credits and/or without inflation

  20. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  1. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  2. Kotka ecopower IGCC-project, the attempt to transfer the biocycle project to Finland

    International Nuclear Information System (INIS)

    Salo, K.

    1998-01-01

    The Danish utilities Elsam and Elkraft planned to build a small (7 MW e ) IGCC-plant in Denmark, called Biocycle Project, based on the gasification and gas clean-up technology of Enviropower Inc. EU/THERMIE program committed to finance part of the investment. The project, however, was not feasible due to the difficulty of finding a suitable customer and sufficient amount of reasonably priced biomass. For this reason a new host and site was found for the Biocycle project. The new site was in Kotka, Finland, where Kotka Energy Ltd., the Energy Board of the City of Kotka acted as the main partner. The fuel of the IGCC project would have been sugar mill wood residue from Xyrofin Inc. During the feasibility investigation (project definition phase) Xyrofin Inc. made the decision to change the production process which eliminated the wood waste production. Without no-cost fuel and due to the low electricity price in Finland the small size IGCC power plant proved not to be feasible. (author)

  3. CO2 control technology effects on IGCC plant performance and cost

    International Nuclear Information System (INIS)

    Chen Chao; Rubin, Edward S.

    2009-01-01

    As part of the USDOE's Carbon Sequestration Program, an integrated modeling framework has been developed to evaluate the performance and cost of alternative carbon capture and storage (CCS) technologies for fossil-fueled power plants in the context of multi-pollutant control requirements. This paper uses the newly developed model of an integrated gasification combined cycle (IGCC) plant to analyze the effects of adding CCS to an IGCC system employing a GE quench gasifier with water gas shift reactors and a Selexol system for CO 2 capture. Parameters of interest include the effects on plant performance and cost of varying the CO 2 removal efficiency, the quality and cost of coal, and selected other factors affecting overall plant performance and cost. The stochastic simulation capability of the model is also used to illustrate the effect of uncertainties or variability in key process and cost parameters. The potential for advanced oxygen production and gas turbine technologies to reduce the cost and environmental impacts of IGCC with CCS is also analyzed

  4. Nuclear power plants: recent developments in Brazil relating to the legal aspect of installation - erection - operation

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1981-10-01

    A Federal statutory system governs the setting up and operation of nuclear power plants in Brazil. This paper describes the general regulatory framework for electric utilities and in particular analyses the licensing procedure for nuclear installations. (NEA) [fr

  5. Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2008-01-01

    The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by dams established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible. (author)

  6. Quality assurance for pipeline installations in nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Approximately 25% of the cost of a nuclear power plant are caused by the pipeline system, i.e. pipes and fixtures. This is an enourmous portion, demanding of the supplier and fitter of these components a very high safety standard. Against the background of the sociopolitical discussion on the safety of nuclear power plants it was a very useful idea of Mannesmann AG, one of the most important manufacturers in this sector, to lay open its quality assurance concept. On the occasion of the symposium ''Safe components for nuclear energy'' held for the expert press it was pointed out that the share of 17% electric energy coming at present from 15 nuclear power plants will increase in future for economic and ecologic reasons. So, it was maintained, the question is not about the ''pro and the con'', but exclusively about the safety standard for nuclear power plants. Specialists from the various branches of the undertaking informed on how this safety concept for the components pipelines and control equipment is realized. (orig./RW) [de

  7. Reliability of fossil-fuel and nuclear power installations

    International Nuclear Information System (INIS)

    1983-01-01

    The conference heard a total of 37 papers of which 24 were inputted in INIS. The subject area was mainly the use of reliability information systems and the production of data banks for these systems, the application of the reliability theory and the reliability analysis of equipment and systems of nuclear power plants. (J.P.)

  8. The effect of wind power installations on coastal tourism

    International Nuclear Information System (INIS)

    Blaydes Lilley, M.; Firestone, J.; Kempton, W.

    2010-01-01

    We surveyed more than 1,000 randomly sampled, out-of-state tourists at Delaware, USA beaches in 2007. After providing respondents with wind turbine project photo-simulations at several distances, we inquired about the effect development would have on visitation. Approximately one-quarter stated that they would switch beaches if an offshore wind project was located 10 km from the coast, with avoidance diminishing with greater distance from shore. Stated avoidance is less than: avoidance with a fossil fuel power plant located the same distance inland; attraction to a beach with offshore wind turbines; and the percentage stating they would likely pay to take a boat tour. (author)

  9. Economical analysis of FV power plants according installed performance

    Directory of Open Access Journals (Sweden)

    Peter Tauš

    2009-09-01

    Full Text Available According prognosis of future development of power capacities in Slovakia till 2030 there is assumed increasing of the electricalenergy volume, produced from renewable energy sources from present 260 MW approximately to 2100 MW (Petrovič, 2008, thatpresents almost 800 % increasing! In Slovakia position of photovoltaic in this sector was due to the high investment cost and on the lastplace due to the low system efficiency. Only possible way for implementation of the photovoltaic to the energetic system of the stateis 0donation. Slovakia will go this way also.

  10. The effect of wind power installations on coastal tourism

    Energy Technology Data Exchange (ETDEWEB)

    Blaydes Lilley, M.; Firestone, J.; Kempton, W. [Center for Carbon-free Power Integration, College of Earth, Ocean, and Environment, University of Delaware, Newark, DE 19716 (United States)

    2010-07-01

    We surveyed more than 1,000 randomly sampled, out-of-state tourists at Delaware, USA beaches in 2007. After providing respondents with wind turbine project photo-simulations at several distances, we inquired about the effect development would have on visitation. Approximately one-quarter stated that they would switch beaches if an offshore wind project was located 10 km from the coast, with avoidance diminishing with greater distance from shore. Stated avoidance is less than: avoidance with a fossil fuel power plant located the same distance inland; attraction to a beach with offshore wind turbines; and the percentage stating they would likely pay to take a boat tour. (author)

  11. Government installation guidelines for the sustainable development of wind power

    International Nuclear Information System (INIS)

    2007-02-01

    The Government of Quebec has made a commitment to clean renewable energy, including wind power, as part of its sustainable development strategy. However, any proposed projects are subject to conditions imposed by regional municipalities. Municipalities are responsible for urban planning laws with jurisdiction over landscape, noise, public safety, and wildlife. Project proponents must meet both social and environmental criteria to ensure the preservation of the municipal territory and the quality of life. Regulations are in place to ensure economic development occurs in tandem with meeting the energy needs of local and regional communities. 16 refs

  12. Air toxics emission from an IGCC process

    Energy Technology Data Exchange (ETDEWEB)

    Mojtahedi, W; Hovath, A [Carbona Inc, Helsinki (Finland); Hinderson, A [Vattenfall Utveckling (Sweden); Nykaenen, J; Hoffren, H [Imatran Voima Oy, Vantaa (Finland); Nieminen, M; Kurkela, E [VTT, Espoo (Finland)

    1997-10-01

    The emissions of 12 toxic trace element from a coal-fired IGCC plant were calculated based on thermodynamic equilibrium in the gas phase and some of the results published. The theoretical calculations were extended to include some other fuels as well as mixture of some of these fuels. The combustion of the product gas in the gas turbine is also considered. These simulations correspond to gasification of the fuel at 850-1050 deg C (depending on the fuel) and 1823 bar pressure. The gas composition was taken from the measured data as far as possible. In the absence of experimental data, a computer code developed for the U-Gas gasifier was used to determine the fuel gas composition. The gas was then cooled to 550 deg C in the gas cooler and filtered at this same temperature and burned in the gas turbine with an air ratio of 3.2. The results of these simulations are compared with the measured data of an experimental program designed to measure the emissions of a few selected trace elements from a 15 MW,h pressurized fluidized bed gasification pilot plant. The pilot plant was equipped with an advanced hot gas cleanup train which includes a two fluidized-bed reactor system for high-temperature, high-pressure external sulfur removal and a filtration unit housing porous, rigid ceramic candle filters. The trace element concentrations in the fuel, bottom ash, and filter ash are determined and the results compared with EPA regulatory levels

  13. The Effect of Wind Power Installations on Coastal Tourism

    Directory of Open Access Journals (Sweden)

    Willett Kempton

    2010-01-01

    Full Text Available We surveyed more than 1,000 randomly sampled, out-of-state tourists at Delaware, USA beaches in 2007. After providing respondents with wind turbine project photo-simulations at several distances, we inquired about the effect development would have on visitation. Approximately one-quarter stated that they would switch beaches if an offshore wind project was located 10 km from the coast, with avoidance diminishing with greater distance from shore. Stated avoidance is less than: avoidance with a fossil fuel power plant located the same distance inland; attraction to a beach with offshore wind turbines; and the percentage stating they would likely pay to take a boat tour.

  14. Market drivers and challenges for gasification-based power plants in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Juergen Karg; Frank Hannemann [Siemens Power Generation (PG) (Germany)

    2006-07-01

    The paper begins by examining the present situation and future trends in the power generation market, before discussing existing IGCC plants and present market activities. IGCC plants in which Siemens are involved are given and coal-based IGCC applications are described. Finally improvement potential of IGCC, and technologies towards zero emission plants (including CO{sub 2} capture and sequestration) are discussed. 19 refs., 7 figs., 3 tabs.

  15. Recent operating experience and improvement of commercial IGCC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    IGCC has today reached a status where experience is available from first and second generation plants, built in the 1970s/1980s and in the 1990s respectively, as commercial-scale demonstration plants for coal-based applications. These plants feature variations on gasification technology and subsequent environmental controls and in operating them a number of technical and commercial lessons have been learned that will help to improve the next generation of IGCC projects. The report reviews and summarises the state-of-the-art and operating experience of several commercial IGCC plants worldwide, setting out the lessons learned and plans for future development embracing such issues as the changes or modifications to plant made to overcome the operational problems and to improve the reliability and availability of the plant. Since IGCC is considered a 'capture ready' technology for CO2 abatement, the current status with regard to the incorporation of carbon capture and storage systems (CCS) has been reviewed. Finally, the report outlines the issues associated with assessing the risks in commercialising IGCC plant.

  16. An acclerator-based installation of small power with the lead-bismuth coolant

    Energy Technology Data Exchange (ETDEWEB)

    Gorshkov, V.T.; Yefimov, E.I.; Novikova, N.N. [Research and Development Bereau, Podolsk (Russian Federation)] [and others

    1995-10-01

    The structure of the accelerator-based installation is described that includes the subcritical reactor-blanket with power 15 MW(h) cooled with lead-bismuth, the lead-bismuth flow target where a beam of {alpha}-particle is injected, the equipment of a primary and secondary curcuits. Some results of calculations and estimations are discussed that have been carried out to justify the target and blanket constructions. Some main characteristics of the installation are presented.

  17. A Low Cost Shading Analyzer and Site Evaluator Design to Determine Solar Power System Installation Area

    Directory of Open Access Journals (Sweden)

    Selami Kesler

    2015-01-01

    Full Text Available Shading analyzer systems are necessary for selecting the most suitable installation site to sustain enough solar power. Afterwards, changes in solar data throughout the year must be evaluated along with the identification of obstructions surrounding the installation site in order to analyze shading effects on productivity of the solar power system. In this study, the shading analysis tools are introduced briefly, and a new and different device is developed and explained to analyze shading effect of the environmental obstruction on the site on which the solar power system will be established. Thus, exposure duration of the PV panels to the sunlight can be measured effectively. The device is explained with an application on the installation area selected as a pilot site, Denizli, in Turkey.

  18. Effective utilization of fossil fuels for low carbon world -- IGCC and high performance gas turbine

    Energy Technology Data Exchange (ETDEWEB)

    Ishii, Hiromi; Hashimoto, Takao; Sakamoto, Koichi; Komori, Toyoaki; Kishine, Takashi; Shiozaki, Shigehiro

    2010-09-15

    The reduction of greenhouse-gas emissions is required to minimize the effect of hydrocarbon based power generation on global warming. In pursue of this objective, Mitsubishi Heavy Industries is dedicating considerable efforts on two different ways to reduce the environmental impact. The first one involves gas turbine performance improvement by raising firing temperature for Natural-gas and LNG applications. In this regard, the latest J class gas turbine was designed to operate at 1600 deg C and expected combined cycle efficiency in excess of 60%. The other approach involves the use of Integrated Gasification Combined Cycle (IGCC) plants to burn solid fuel like coal.

  19. Multi-megawatt wind-power installations call for new, high-performance solutions

    International Nuclear Information System (INIS)

    2004-01-01

    This article discusses the development of increasingly powerful and profitable wind-energy installations for off-shore, on-shore and refurbishment sites. In particular, the rapid development of megawatt-class units is discussed. The latest products of various companies with rotor diameters of up to 120 metres and with power ratings of up to 5 MW are looked at and commented on. The innovations needed for the reduction of weight and the extreme demands placed on gearing systems are discussed. Also, the growing markets for wind energy installations in Europe and the United States are discussed and plans for new off-shore wind parks are looked at

  20. Wind-power installation on the Guetsch in Switzerland; Windkraftanlage Guetsch, EW Ursern, Andermatt UR

    Energy Technology Data Exchange (ETDEWEB)

    Russi, M.

    2006-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 800 kW wind turbine installed in 2001/2002 by the Ursern electricity utility near Andermatt, Switzerland, at a height of 2350 meters above sea level. The original prototype wind turbine contained various components from Swiss industry, such as the generator and the inverter. Because of difficulties (cracks in rotor blades, bankruptcy of the manufacturer, etc.) this installation was replaced by an Enercon 600-kW-wind turbine in 2004. Characteristic features of this turbine, such as is its adaptation for use under turbulent wind conditions at cold locations, are discussed. The results obtained in 2005 made it obvious that the utilisation of wind energy in alpine regions is possible and that the extreme conditions at this location do not significantly affect the efficient and safe operation of such an installation. Together with the presence of a meteorological station in the vicinity, optimal operating conditions prevail at this site for further research projects in connection with icing-up of turbine blades and wind energy. The report describes the installation and de-installation of the first turbine and the installation of the present one. Initial experience gained with the installation and its certification by the 'Naturemade' eco-power programme is discussed, as is future expansion at the site.

  1. Modeling and assessment of future IGCC plant concepts with CO{sub 2} capture; Simulation und Bewertung zukuenftiger IGCC-Kraftwerkskonzepte mit CO{sub 2}-Abtrennung

    Energy Technology Data Exchange (ETDEWEB)

    Kunze, Christian A.

    2012-07-13

    The thesis focuses on the assessment of efficiency potential of future IGCC plants with CO{sub 2} capture. Starting point is a comprehensive analysis (thermodynamic, economic and exergy) of a state of the art IGCC. Additionally, five future IGCC concepts are proposed and evaluated for their efficiency potential in the mid- and long-term. The concepts showed significantly higher efficiencies up to approximately 60% and enable an almost CO{sub 2}-free operation.

  2. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  3. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  4. Installation and evaluation of a nuclear power plant operator advisor based on artificial intelligence technology

    International Nuclear Information System (INIS)

    Hajek, B.K.; Miller, D.W.

    1989-01-01

    This report discusses the following topics on a Nuclear Power Plant operator advisor based on artificial Intelligence Technology; Workstation conversion; Software Conversion; V ampersand V Program Development Development; Simulator Interface Development; Knowledge Base Expansion; Dynamic Testing; Database Conversion; Installation at the Perry Simulator; Evaluation of Operator Interaction; Design of Man-Machine Interface; and Design of Maintenance Facility

  5. Legal action initiated by a municipality in order to prevent installation of a nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    A municipality is authorized to appeal against the licensing of a nuclear power plant which is about to be installed in the neighbourhood of the municipality in order to protect its water treatment plant. (Non-official headnotes) OVG Rheinland-Pfalz, interlocutary decree of June 3, 1986 - 7 A II 2/85 - (appealable). (orig./HSCH) [de

  6. A problem of optimization for the specific cost of installed electric power in nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    Sultan, M A; Khattab, M S [Reactors Dept. nuclear research centre, atomic energy authority, Cairo, (Egypt)

    1995-10-01

    The optimization problem analyzed in this paper is related to the thermal cycle parameters in nuclear power stations having steam generators. The optimization the specific cost of installed power with respect to the average operating saturation temperature in the station thermal cycle. The analysis considers the maximum fuel cladding temperature as a limiting factor in the optimization process as it is related to the safe operation of the reactor. 4 figs.

  7. Future technological and economic performance of IGCC and FT production facilities with and without CO2 capture: Combining component based learning curve and bottom-up analysis

    NARCIS (Netherlands)

    Knoope, M.M.J.; Meerman, J.C.; Ramirez, C.A.; Faaij, A.P.C.

    2013-01-01

    This study aims to investigate the technological and economic prospects of integrated gasification facilities for power (IGCC) and Fischer–Tropsch (FT) liquid production with and without CCS over time. For this purpose, a component based experience curve was constructed and applied to identify the

  8. More Energy-Efficient CO2 Capture from IGCC GE Flue Gases

    Directory of Open Access Journals (Sweden)

    Rakpong Peampermpool

    2017-03-01

    Full Text Available Carbon dioxide (CO2 emissions are one of the main reasons for the increase in greenhouse gasses in the earth’s atmosphere and carbon capture and sequestration (CCS is known as an effective method to reduce CO2 emissions on a larger scale, such as for fossil energy utilization systems. In this paper, the feasibility of capturing CO2 using cryogenic liquefaction and improving the capture rate by expansion will be discussed. The main aim was to design an energy-saving scheme for an IGCC (integrated gasification combined cycle power plant with CO2 cryogenic liquefaction capture. The experimental results provided by the authors, using the feed gas specification of a 740 MW IGCC General Electric (GE combustion power plant, demonstrated that using an orifice for further expanding the vent gas after cryogenic capture from 57 bar to 24 bar gave an experimentally observed capture rate up to 65%. The energy-saving scheme can improve the overall CO2 capture rate, and hence save energy. The capture process has also been simulated using Aspen HYSYS simulation software to evaluate its energy penalty. The results show that a 92% overall capture rate can be achieved by using an orifice.

  9. Final installation and testing of the feedback power amplifier for the Scyllac feedback experiment

    International Nuclear Information System (INIS)

    Kutac, K.J.; Kewish, R.W. Jr.; Gribble, R.F.; Rawcliffe, A.S.; Miller, G.; Kemp, E.L.; Bartsch, R.R.

    1975-01-01

    The Scyllac feedback system consists of eight subsystems. The installation and testing of the many components and eight subsystems are described. The eight subsystems are: (1) ML-8618 power amplifiers; (2) dc plate and bias power supplies; (3) ac filament power supplies; (4) position detector and signal processor (intermediate amplifier); (5) l = 0 and l = 2 output load coils; (6) control system and interlock system; (7) computer controlled analog-to-digital transient recorders; and (8) cable distribution and cooling-water supply system

  10. Effect of distributed generation installation on power loss using genetic algorithm method

    Science.gov (United States)

    Hasibuan, A.; Masri, S.; Othman, W. A. F. W. B.

    2018-02-01

    Injection of the generator distributed in the distribution network can affect the power system significantly. The effect that occurs depends on the allocation of DG on each part of the distribution network. Implementation of this approach has been made to the IEEE 30 bus standard and shows the optimum location and size of the DG which shows a decrease in power losses in the system. This paper aims to show the impact of distributed generation on the distribution system losses. The main purpose of installing DG on a distribution system is to reduce power losses on the power system.Some problems in power systems that can be solved with the installation of DG, one of which will be explored in the use of DG in this study is to reduce the power loss in the transmission line. Simulation results from case studies on the IEEE 30 bus standard system show that the system power loss decreased from 5.7781 MW to 1,5757 MW or just 27,27%. The simulated DG is injected to the bus with the lowest voltage drop on the bus number 8.

  11. Increased installation in existing hydro power plants. Potentials and costs; Oekt installasjon i eksisterende kraftverk. Potensial og kostnader

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, Kjell Erik (ed.)

    2011-06-15

    This report seeks to highlight the costs associated with increased installed capacity of existing hydropower plants. Five selected power plant is further studied. Furthermore, given an overview of the technical possibilities of power expansions in Norway. (AG)

  12. Using renewables and the co-production of hydrogen and electricity from CCS-equipped IGCC facilities, as a stepping stone towards the early development of a hydrogen economy

    International Nuclear Information System (INIS)

    Haeseldonckx, Dries; D'haeseleer, William

    2010-01-01

    In this paper, specific cases for the interaction between the future electricity-generation mix and a newly-developing hydrogen-production infrastructure is modelled with the model E-simulate. Namely, flexible integrated-gasification combined-cycle units (IGCC) are capable of producing both electricity and hydrogen in different ratios. When these units are part of the electricity-generation mix and when they are not operating at full load, they could be used to produce a certain amount of hydrogen, avoiding the costly installation of new IGCC units for hydrogen production. The same goes for the massive introduction of renewable energies (especially wind), possibly generating excess electricity from time to time, which could then perhaps be used to produce hydrogen electrolytically. However, although contra-intuitive, the interaction between both 'systems' turns out to be almost negligible. Firstly, it is shown that it is more beneficial to use IGCC facilities to produce hydrogen with, rather than (excess) wind-generated electricity due to the necessary electrolyser investment costs. But even flexible IGCC facilities do not seem to contribute substantially to the early development of a hydrogen economy. Namely, in most scenarios - which are combinations of a wide range of fuel prices and carbon taxes - one primary-energy carrier (natural gas or coal) seems to be dominant, pushing the other, and the corresponding technologies such as reformers or IGCCs, out of the market. (author)

  13. Specifications, tests, and installation of wires and cables for the Diablo Canyon Nuclear Power Project

    International Nuclear Information System (INIS)

    Dan, F.J.

    1977-01-01

    The process of selecting wires and cables for the Diablo Canyon Nuclear Power Project is described. The criteria for the fire and environmental tests, the basis for the specifications, and the reasons for the final choice and acceptance are outlined. A short section is dedicated to the installation of cables in raceways with reference to separation and color coding. Also covered are the selection and testing of fire stops and the selection of seismic supports

  14. Some problems of evaluating environmental impacts of nuclear power installation building and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The impacts of the construction and operation of a nuclear power installation on the natural environment is discussed, namely on changes in the landscape profile, in the structure of settlement and large-scale agricultural production, the requisition of agricultural land, changes in transport systems, etc., as well as approaches to the evaluation of these environmental impacts with the aim of preserving the optimal state of inter-relations between man and the natural environment. (author)

  15. A single IGCC design for variable CO{sub 2} capture

    Energy Technology Data Exchange (ETDEWEB)

    O' Keefe, L.F.; Griffiths, J.; Wainwright, J.M. [Chevron Texaco Worldwide Power and Gasification, Houston, TX (United States)

    2002-07-01

    Global warming and the production of greenhouse gases (GHG) have become an important issue in many countries around the world. While there has been a heightened sense of awareness that the combustion of fossil fuels produces the majority of the controllable carbon dioxide released to the atmosphere, there have been few substantive solutions that produce economically realistic solutions. Moreover, some fossil fuels, like coal, are viewed negatively due to their relatively high carbon content per Btu. Integrated Gasification Combined Cycle (IGCC) offers the option of a realistic, economically viable solution for reducing, by pre-combustion capture, significant amounts of CO{sub 2} while using existing commercially proven technologies. The novel IGCC flowscheme is designed so that the power plant can be built and operated without CO{sub 2} removal and later upgraded to low CO{sub 2} emissions at minimal additional cost. The novel flowscheme is based on commercially proven technology using processes that are in operation today. Overall performance and capital cost estimates are presented and two other possible applications of the novel flowscheme are discussed in this paper. 17 refs., 3 figs., 2 tabs.

  16. Post-installed concrete anchors in nuclear power plants: Performance and qualification

    International Nuclear Information System (INIS)

    Mahrenholtz, Philipp; Eligehausen, Rolf

    2015-01-01

    Graphical abstract: - Highlights: • Review of qualification and design regulations for anchors in nuclear power plants. • First complete set of nuclear anchor load–displacement data and its evaluation ever. • Demonstration of robust test behavior of a qualified post-installed anchor product. - Abstract: In nuclear power plants (NPPs), post-installed anchors are widely used for structural and non-structural connections to concrete. In many countries, anchor products employed for safety relevant applications have to be approved by the authorities. For the high safety standards in force for NPPs, special requirements have to be met to allow for extreme design situations. This paper presents an experimental test program conducted to evaluate the performance of anchors according to the German Guideline for Anchorages in Nuclear Power Plants and Nuclear Technology Installations (DIBt KKW Leitfaden, 2010). After a brief introduction to anchor behavior and the regulative context, the results of tension and shear tests carried out on undercut anchors are discussed. Robust load capacities and relatively small displacements determined for demanding load and crack cycling tests demonstrated the suitability of anchors qualified according to a state-of-the-art qualification guideline

  17. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  18. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  19. Advanced LP turbine installation at 1300 MW nuclear power station Unterweser

    International Nuclear Information System (INIS)

    Jacobsen, G.; Oeynhausen, H.; Termuehlen, H.

    1991-01-01

    This paper reports on Preussen Elektra AG's Unterweser power plant. The steam turbine-generator features a disk-type LP turbine rotor design developed in the late 1960's to early 1970's. This rotor design has been installed in 19 nuclear power plants. The 47 rotors in these plants have been in operation for an average of almost 10 years. The design of the 1970 vintage nuclear LP turbine rotors was based on extensive experience gained with disk-type rotors of fossil turbines built in the 1950's. When EPRI reported about corrosion cracking in nuclear LP turbines, a program was initiated by Siemens/KWU as original steam turbine supplier to ultrasonically inspect all their disk-type rotors in nuclear power plats. Indications on one rotor disk in the Unterweser plant was found. This single event was the only one found out of 310 disks inspected in nuclear power plants

  20. Hydro-power installation on the Prascherbach, Nufenen, Switzerland; Wasserkraftwerk Prascherbach, Nufenen. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Marugg, R.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of an 80-year old hydro-power plant in Nufenen, Switzerland. Details on the new power station, which is to produce 300 kilowatts of electrical power using a height difference of 340 metres is to provide 1.3 million kilowatt-hours of electricity per year. The report reviews the history of the project, which goes back to the 1990s and describes the project approved in 1999 as well as the updates made afterwards. The financial aspects of the project and remuneration for the power generated are examined. Environmental issues connected with the project are also discussed. The proposed course of events involved in taking further steps toward the realisation of the installation are discussed. An appendix includes copies of the various documents pertaining to cost estimation, water quantities, environmental protection and the granting of building permission.

  1. Risk concept and risk management in the field of power installations

    International Nuclear Information System (INIS)

    Stein, Manfred; Barbulescu, Christiana; Anastasiu, Dan; Ionescu, Dumitru Cezar; Iliescu-Saligny, Paul; Iordache, Vasile

    1996-01-01

    The paper presents several opinions concerning general as well as specific aspects related to the risk management and the use of this concept in the field of power generation. Assessment possibilities of disturbing phenomena are analyzed including severe events leading to failures in power installations. Circumstances of occurring of such events are considered. This paper contains 4 sections. In the introduction the definition of the concept of risk is given. Risk is thus related to both events of a distinct nature with potentially dangerous consequences and events occurring in current operation of installations of different types. The risk notion is as important as other probabilistic indicators characterizing the power installation operation, i.e. availability, reliability, maintenance, etc. The section 2 approaches the concept of risk and argues for the necessity of quantifying it. Two probabilistic indicators are introduced, namely, the occurring probability of a disturbing event and the occurring frequency. To establish an algorithm of risk evaluation the risk notion should be dissociated into two components, the 'intrinsic' or 'initial' risk and the 'associated' risk. In turn, the latter could be divided into two types of risks, namely, the risk of an extant sustaining factor and the risk characterizing the exposure to the effects of the considered events. Applications of these notions for the cases of nuclear accidents, urban electricity or heating breakdown, energy supply breakdown in chemical facilities and others are given. The third section deals with risk management in power sector. Three objectives are here taken into account, i.e., ensuring the safety in operation of adopted systems, ensuring the safety of these systems from the consumers' standpoints and ensuring the environment protection. Examples for using the concepts introduced in case of electrical power stations or energy supply systems are given

  2. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  3. Experimental coal dust suppression system installed at the Nikola Tesla thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Guzijan, D [Rudarski Institut, Belgrade (Yugoslavia). Zavod za Ventilaciju i Tehnicku Zastitu

    1988-01-01

    Describes a project conducted at the Nikola Tesla thermal power plant by the Mining Institute of Belgrade to reduce the high levels of dust concentrations in overloading stations on coal conveyors and hoppers. A mathematical model was developed to determine the ventilation capacity required at each of the 18 overloading stations with the hoppers considered successively: empty, 1/3 full, 2/3 full and completely full. Shows how this model enabled an efficient dust suppression system to be developed and subsequently installed by the Termovent company in Belgrade using 4 axial ventilators supplied by the Ventilator Company in Zagreb. The ventilators were powered by means of 5.5 kW electric motors and provided 440 Pa pressure at 950 rpm. Gives the result of dust concentration measurements indicating that the installed system achieved the results predicted by the mathematical model and that the levels were well below the statutory limit. A description of the complete installation is included. 3 refs.

  4. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    Energy Technology Data Exchange (ETDEWEB)

    Nourai, Ali (American Electric Power Company, Columbus, OH)

    2007-06-01

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  5. Installation of the Light-Water Breeder Reactor at the Shippingport Atomic Power Station (LWBR Development Program)

    International Nuclear Information System (INIS)

    Massimino, R.J.; Williams, D.A.

    1983-05-01

    This report summarizes the refueling operations performed to install a Light Water Breeder Reactor (LWBR) core into the existing pressurized water reactor vessel at the Shippingport Atomic Power Station. Detailed descriptions of the major installation operations (e.g., primary system preconditioning, fuel installation, pressure boundary seal welding) are included as appendices to this report; these operations are of technical interest to any reactor servicing operation, whether the reactor is a breeder or a conventional light water non-breeder core

  6. Installation of the Light-Water Breeder Reactor at the Shippingport Atomic Power Station (LWBR Development Program)

    Energy Technology Data Exchange (ETDEWEB)

    Massimino, R.J.; Williams, D.A.

    1983-05-01

    This report summarizes the refueling operations performed to install a Light Water Breeder Reactor (LWBR) core into the existing pressurized water reactor vessel at the Shippingport Atomic Power Station. Detailed descriptions of the major installation operations (e.g., primary system preconditioning, fuel installation, pressure boundary seal welding) are included as appendices to this report; these operations are of technical interest to any reactor servicing operation, whether the reactor is a breeder or a conventional light water non-breeder core.

  7. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Science.gov (United States)

    2010-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  8. Simulation and verification of transient events in large wind power installations

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.; Hansen, A.D.; Christensen, P.; Meritz, M.; Bech, J.; Bak-Jensen, B.; Nielsen, H.

    2003-10-01

    Models for wind power installations excited by transient events have been developed and verified. A number of cases have been investigated, including comparisons of simulations of a three-phase short circuit, validation with measurements of tripping of single wind turbine, islanding of a group of two wind turbines, and voltage steps caused by tripping of wind turbines and by manual transformer tap-changing. A Benchmark model is also presented, enabling the reader to test own simulation results against results obtained with models developed in EMTDC and DIgSILENT. (au)

  9. Application of high-strength non-shrink cement based grouting material in nuclear power installations

    International Nuclear Information System (INIS)

    Li Zhong; Zuo Weiwei

    2011-01-01

    This paper briefly describes the related technical requirement of secondary grouting during the process of equipment installation in nuclear power projects. The method and procedure are introduced in detail from the aspects of acceptance, preparation, pouring, collecting and maintenance of the high-strength non-shrinking based pouring cement material, and the cautions during the construction is also provided. The factors affecting the quality of the field grouting is analyzed, and the measures to reduce or eliminate the micro-cracks during the process is provided. (authors)

  10. Resolution 8.069/12. It approve the regulations for the large size structures installation, destined for wind power generation

    International Nuclear Information System (INIS)

    2012-01-01

    This resolution approve the regulations for the large size structures installation, destined to wind power generation. The objective of this rule is to regulate the urban conditions of the facilities and the environmental guarantees, safety and inhabitants wholesomeness

  11. Thermal tests of large recirculation cooling installations for nuclear power plants

    Science.gov (United States)

    Balunov, B. F.; Lychakov, V. D.; Il'in, V. A.; Shcheglov, A. A.; Maslov, O. P.; Rasskazova, N. A.; Rakhimov, R. Z.; Boyarov, R. A.

    2017-11-01

    The article presents the results from thermal tests of some recirculation installations for cooling air in nuclear power plant premises, including the volume under the containment. The cooling effect in such installations is produced by pumping water through their heat-transfer tubes. Air from the cooled room is blown by a fan through a bundle of transversely finned tubes and is removed to the same room after having been cooled. The finning of tubes used in the tested installations was made of Grade 08Kh18N10T and Grade 08Kh18N10 stainless steels or Grade AD1 aluminum. Steel fins were attached to the tube over their entire length by means of high-frequency welding. Aluminum fins were extruded on a lathe from the external tube sheath into which a steel tube had preliminarily been placed. Although the fin extrusion operation was accompanied by pressing the sheath inner part to the steel tube, tight contact between them over the entire surface was not fully achieved. In view of this, the air gap's thermal resistance coefficient was introduced in calculating the heat transfer between the heat-transferring media. The air gap average thickness was determined from the test results taking into account the gap variation with temperature due to different linear expansion coefficients of steel and aluminum. These tests, which are part of the acceptance tests of the considered installations, were carried out at the NPO TsKTI test facility and were mainly aimed at checking if the obtained thermal characteristics were consistent with the values calculated according to the standard recommendations with introduction, if necessary, of modifications to those recommendations.

  12. A short history of wind power - from its early beginnings to today's installations and its business environment

    International Nuclear Information System (INIS)

    2005-01-01

    This article takes a look at how wind power has developed from its beginnings centuries ago with windmills over early installations in Denmark around 1900 through to the modern wind-parks providing many thousands of megawatts of wind power generated by 100-metre-high units with installed power ratings of up to 5 megawatts. The history of wind power is looked at from the simple windmill to the modern, industrially manufactured mass product. The expected growth of the wind-power market in the twenty-first century is discussed, as are the legal regulations governing their construction and use. Figures are also given on production capacities and installed power in various countries

  13. Speciation of major and selected trace elements in IGCC fly ash

    Energy Technology Data Exchange (ETDEWEB)

    Oriol Font; Xavier Querol; Frank E. Huggins; Jose M. Chimenos; Ana I. Fernandez; Silvia Burgos; Francisco Garcia Pena [Institute of Earth Sciences ' Jaume Almera' , Barcelona (Spain)

    2005-08-01

    The speciation of Ga, Ge, Ni, V, S and Fe in fly ash from IGCC power plant were investigated for possible further extraction process by combining conventional mineral and chemical analysis, leaching tests, wet sequential extraction, Moessbauer and XAFS spectroscopies. The results shown that Ge occurs mainly as water-soluble species, GeS and/or GeS{sub 2} and hexagonal GeO{sub 2}. Ga is present as an oxide, Ni occurs mainly as nickeline (NiAs), with minor proportions of Ni arsenates and vanadium as V(III) with minor amounts of V(IV) in the aluminosilicate glass matrix. Pyrrhotite and wurtzite-sphalerite are sulfide species containing Fe and Zn, but an important fraction of iron is also present in the aluminosilicate glass. These clear differences between the speciation of the above elements in this material and those reported for fly ash from conventional PC combustion. 15 refs., 8 figs., 5 tabs.

  14. Siemens sees a future for IGCC - and now it has the technology

    Energy Technology Data Exchange (ETDEWEB)

    Schmid, C.; Hannemann, F. [Siemens Fuel Gasification Technology, Freiberg (Germany)

    2007-10-15

    About 18 months ago Siemens became a key player in the gasification business through its acquisition of Freiberg based Future Energy and its GSP entrained flow technology, now called SFG (Siemens Fuel Gasification). Developed at Schwarze Pumpe in Eastern Germany over many years, a particular attraction of the process is its ability to use low rank fuels such as lignite, with a robust gasifier wall concept a 'cooling screen' that avoids the use of troublesome refractories. The article explains the SFG gasifier technology. It is ideally suited for coal-fueled IGCC power plants with integrated CO{sub 2} capture, especially for low-rank fuels. SFG has been ordered or pre-selected for a number of projects in China, North America and elsewhere. 5 figs.

  15. Assessing the effects of customer innovativeness, environmental value and ecological lifestyles on residential solar power systems install intention

    International Nuclear Information System (INIS)

    Chen, Kee Kuo

    2014-01-01

    To understand the impact of environmental value, ecological lifestyle, customer innovativeness on customer intention to install solar power system (SPS) in their private houses, an empirical model was proposed. Customer innovativeness was treated as a second-order construct with two first-order dimensions, with each of the latter being measured by means of reflective indicators. Using structural equation modeling, data collected from 203 college students and faculties at a University of Taiwan were tested against the model. We found that environmental value has a positive impact on ecological lifestyle and SPS install intention. Although ecological lifestyle associates positively with SPS install intention, the effect disappears when environmental value is included in the model. The effect of customer innovativeness on SPS install intention results from the tendency of customer novelty seeking, while the impact of customer independent judgment-making on SPS install intention is insignificant. The model explained 76% of the total variations within SPS install intention. Managerial implications for promoting of SPS are considered, and suggestions for further research provided. - Highlights: • We integrate customer innovativeness into an environmental behavior model. • The impact of customer innovativeness on SPS install intention was confirmed. • The impact of novelty seeking on SPS install intention has been found. • Environmental value is the most important factor for SPS install intention. • The model explained 76% of the total variations within SPS install intention

  16. Comparison of Shell, Texaco, BGL and KRW gasifiers as part of IGCC plant computer simulations

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, L.; Furimsky, E. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Energy Technology Centre

    2005-07-01

    The performances of four IGCC plants employing Shell, Texaco, BGL and KRW gasifiers were simulated using ASPEN Plus software for three different feeds. Performance analyses and comparisons of all four IGCC plants were performed based on the established data bank from the simulation. Discussions were focused on gas compositions, gasifier selection and overall performance.

  17. Developments in the pre-combustion CO2 capture pilot plant at the Buggenum IGCC

    NARCIS (Netherlands)

    Damen, K.; Gnutek, R.; Kaptein, J.; Nannan, N.R.; Oyarzun, B.; Trapp, C.; Colonna, P.; Van Dijk, E.; Gross, J.; Bardow, A.

    2011-01-01

    N.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a multi-fuel IGCC with CO2 capture and storage (Nuon Magnum) in Eemshaven, the Netherlands. In order to prepare for large-scale application of CO2 capture and storage, a CO2 capture pilot plant is constructed at

  18. Assessing and improving the safety culture of non-power nuclear installations

    International Nuclear Information System (INIS)

    Bastin, S.J.; Cameron, R.F.; McDonald, N.R.; Adams, A.; Williamson, A.

    2000-01-01

    The development and application of safety culture principles has understandably focused on nuclear power plant and fuel cycle facilities and has been based on studies in Europe, North America, Japan and Korea. However, most radiation injuries and deaths have resulted from the mishandling of radioactive sources, inadvertent over-exposure to X-rays and critically incidents, unrelated to nuclear power plant. Within the Forum on Nuclear Cooperation in Asia (FNCA), Australia has been promoting initiatives to apply safety culture principles across all nuclear and radiation application activities and in a manner that is culturally appropriate for Asian countries. ANSTO initiated a Safety Culture Project in 1996 to develop methods for assessing and improving safety culture at nuclear and radiation installations other than power reactors and to trial these at ANSTO and in the Asian region. The project has sensibly drawn on experience from the nuclear power industry, particularly in Japan and Korea. There has been a positive response in the participating countries to addressing safety culture issues in non-power nuclear facilities. This paper reports on the main achievements of the project. Further goals of the project are also identified. (author)

  19. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    International Nuclear Information System (INIS)

    Nielsen, T K; Kjeldsen, M

    2010-01-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  20. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    Science.gov (United States)

    Nielsen, T. K.; Kjeldsen, M.

    2010-08-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  1. Environmental Impacts From the Installation and Operation of Large-scale Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Fthenakis, V.; Turney, Damon

    2011-04-23

    Large-scale solar power plants are being developed at a rapid rate, and are setting up to use thousands or millions of acres of land globally. The environmental issues related to the installation and operation phases of such facilities have not, so far, been addressed comprehensively in the literature. Here we identify and appraise 32 impacts from these phases, under the themes of land use intensity, human health and well-being, plant and animal life, geohydrological resources, and climate change. Our appraisals assume that electricity generated by new solar power facilities will displace electricity from traditional U.S. generation technologies. Altogether we find 22 of the considered 32 impacts to be beneficial. Of the remaining 10 impacts, 4 are neutral, and 6 require further research before they can be appraised. None of the impacts are negative relative to traditional power generation. We rank the impacts in terms of priority, and find all the high-priority impacts to be beneficial. In quantitative terms, large-scale solar power plants occupy the same or less land per kW h than coal power plant life cycles. Removal of forests to make space for solar power causes CO{sub 2} emissions as high as 36 g CO{sub 2} kW h{sup -1}, which is a significant contribution to the life cycle CO{sub 2} emissions of solar power, but is still low compared to CO{sub 2} emissions from coal-based electricity that are about 1100 g CO{sub 2} kW h{sup -1}.

  2. The impact of future carbon prices on CCS investment for power generation in China

    International Nuclear Information System (INIS)

    Wu, Ning; Parsons, John E.; Polenske, Karen R.

    2013-01-01

    Carbon capture and storage (CCS) in China is currently discussed extensively but few in-depth analyses focusing on economics are observed. In this study, we answer two related questions about the development of CCS and power generation technologies in China: (1) what is the breakeven carbon-dioxide price to justify CCS installation investment for Integrated Gasification Combined Cycle (IGCC) and pulverized coal (PC) power plants, and, (2) what are the risks associated with investment for CCS. To answer these questions, we build a net present value model for IGCC and PC plants with capacity of 600 MW, with assumptions best representing the current technologies in China. Then, we run a sensitivity analysis of capital costs and fuel costs to reveal their impact on the carbon price, and analyze the risk on investment return caused by the carbon price volatility. Our study shows that in China, a breakeven carbon price of $61/tonne is required to justify investment on CCS for PC plants, and $72/tonne for IGCC plants. In this analysis, we also advise investors on the impact of capital and fuel costs on the carbon price and suggest optimal timing for CCS investment. - Highlights: ► We collect data on CCS and power generation which best represents technologies and costs in China. ► We model power plants' net present value to find the breakeven carbon prices. ► IGCC needs $72 per tonne to breakeven while PC requires $61 in China. ► Capital and fuel costs impact the carbon prices noticeably. ► We also examine the sensitivity, impact on return and time for investment

  3. Application of nuclear power station design criteria to non-nuclear installations

    International Nuclear Information System (INIS)

    Regan, J.D.; Hughes, D.J.

    1989-01-01

    The nuclear industry is multi faceted, in that it includes large and complex chemical plants, a large number of different types of nuclear power stations, and on shore ship maintenance facilities, each with its own unique problems. Since the early days the industry has been aware of the additional problem which is superimposed on what may be classed as traditional fire risks, that is, the risk of an uncontrolled release of radioactivity. This has led to the development of sophisticated fire prevention and control techniques which are applied to new plants, and to the backfitting of older plants. The techniques of analysis, design and operation can be applied to both nuclear and non-nuclear installations. Passive protection is preferred backed up by active techniques. Segregation of essential plant to increase the probability of sufficient surviving to ensure safety systems operate and the provision of smoke free, protected escape routes are important aspects of layout and design. Reliability assessments, venting of smoke and hot gases, fire severity analysis, application of mathematical models contribute to the final design to protect against fires. Experiences built up in the fire fighting profession is integrated into the numerical approach by frequent involvement of the local Fire Officers at each stage of the design and layout of installations. (author)

  4. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric

  5. Practical application of the benchmarking technique to increase reliability and efficiency of power installations and main heat-mechanic equipment of thermal power plants

    Science.gov (United States)

    Rimov, A. A.; Chukanova, T. I.; Trofimov, Yu. V.

    2016-12-01

    Data on the comparative analysis variants of the quality of power installations (benchmarking) applied in the power industry is systematized. It is shown that the most efficient variant of implementation of the benchmarking technique is the analysis of statistical distributions of the indicators in the composed homogenous group of the uniform power installations. The benchmarking technique aimed at revealing the available reserves on improvement of the reliability and heat efficiency indicators of the power installations of the thermal power plants is developed in the furtherance of this approach. The technique provides a possibility of reliable comparison of the quality of the power installations in their homogenous group limited by the number and adoption of the adequate decision on improving some or other technical characteristics of this power installation. The technique provides structuring of the list of the comparison indicators and internal factors affecting them represented according to the requirements of the sectoral standards and taking into account the price formation characteristics in the Russian power industry. The mentioned structuring ensures traceability of the reasons of deviation of the internal influencing factors from the specified values. The starting point for further detail analysis of the delay of the certain power installation indicators from the best practice expressed in the specific money equivalent is positioning of this power installation on distribution of the key indicator being a convolution of the comparison indicators. The distribution of the key indicator is simulated by the Monte-Carlo method after receiving the actual distributions of the comparison indicators: specific lost profit due to the short supply of electric energy and short delivery of power, specific cost of losses due to the nonoptimal expenditures for repairs, and specific cost of excess fuel equivalent consumption. The quality loss indicators are developed

  6. Replacement of the Farbtobel hydro power installation in Peist, Switzerland; Gemeinde Peist (GR). Neubau Wasserkraftwerk Farbtobel - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Scherrer, I.; Gadient, N.

    2009-12-15

    This illustrated report for the Swiss Federal Office of Energy (SFOE) deals with various aspects of a small hydro project in Peist, Switzerland. The report presents a project concerning the replacement of the existing Farbtobel small hydro installation. The catchment area involved, its hydrology, high-water considerations and river ecology are examined. The power station concept, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. Remuneration for the power produced through the Swiss cost-covering remuneration scheme is discussed.

  7. First operation experiences from a 30 kV 104 MVA HTS power cable installed in a utility substation

    DEFF Research Database (Denmark)

    Willen, D.; Hansen, F.; Daumling, M.

    2002-01-01

    realistic conditions in the substation of Amager (AMK). Approximately 50 000 private and business customers are supplied from this cable. The load can be adjusted from 20% to 100% of the power supplied and the number of branches connected can be altered. This and other early HTS power installations...... are expected to act as ice-breakers for the HTS technology...

  8. Manual on quality assurance for installation and commissioning of instrumentation, control and electrical equipment in nuclear power plants

    International Nuclear Information System (INIS)

    1989-01-01

    The present Manual on Quality Assurance (QA) for Installation and Commissioning of Instrumentation, Control and Electrical (ICE) Equipment of Nuclear Power Plants contains supporting material and illustrative examples for implementing basic requirements of the quality assurance programme in procurement, receiving, installation and commissioning of this equipment. The Manual on Quality Assurance for Installation and Commissioning of ICE Equipment is designed to supplement and be consistent with the Guidebook as well as with the IAEA Code and Safety Guides on Quality Assurance. It is intended for the use of managerial staff and QA personnel of nuclear power plant owners or the organizations respectively responsible for the legal, technical, administrative and financial aspects of a nuclear power plant. The information provided in the Manual will also be useful to the inspection staff of the regulatory organization in the planning and performance of regulatory inspections at nuclear power plants

  9. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Windkraftanlagen in der Schweiz. Checkliste fuer Investoren von Grossanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  10. Wireless power transfer electric vehicle supply equipment installation and validation tool

    Science.gov (United States)

    Jones, Perry T.; Miller, John M.

    2015-05-19

    A transmit pad inspection device includes a magnetic coupling device, which includes an inductive circuit that is configured to magnetically couple to a primary circuit of a charging device in a transmit pad through an alternating current (AC) magnetic field. The inductive circuit functions as a secondary circuit for a set of magnetically coupled coils. The magnetic coupling device further includes a rectification circuit, and includes a controllable load bank or is configured to be connected to an external controllable load back. The transmit pad inspection device is configured to determine the efficiency of power transfer under various coupling conditions. In addition, the transmit pad inspection device can be configured to measure residual magnetic field and the frequency of the input current, and to determine whether the charging device has been installed properly.

  11. Pre-Combustion Capture of CO2 in IGCC Plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-12-15

    Pre-combustion capture involves reacting a fuel with oxygen or air and/or steam to give mainly a 'synthesis gas (syngas)' or 'fuel gas' composed of carbon monoxide and hydrogen. The carbon monoxide is reacted with steam in a catalytic reactor, called a shift converter, to produce CO2 and more hydrogen. CO2 is then separated, usually by a physical or chemical absorption process, resulting in a hydrogen-rich fuel which can be used in many applications, such as boilers, furnaces, gas turbines, engines and fuel cells. Pre-combustion capture is suitable for use in integrated gasification combined cycle (IGCC) plants especially since the CO2 partial pressures in the fuel gas are higher than in the flue gas. After the introduction there follows a short discussion of the water-gas shift (WGS) reaction. This is followed by chapters on the means of CO2 capture by physical and chemical solvents, solid sorbents, and membranes. The results and conclusions of techno-economic studies are introduced followed by a look at some of the pilot and demonstration plants relevant to pre-combustion capture in IGCC plants.

  12. Modification of reactor installation in the Genkai nuclear power plant No. 1 of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 25, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Genkai nuclear power plant No. 1 of the Kyushu Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kyushu Electric Power Company, Inc., to the Minister of International Trade and Industry on July 24, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  13. Inquiry relating to modification of reactor installation of Hamaoka No. 2 nuclear power plant of Chubu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modification of reactor installation of the Hamaoka No. 2 nuclear power plant, Chubu Electric Power Company, Inc., on February 8, 1979, from the president of the company. After the safety evaluation in the Ministry of International Trade and Industry was finished, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on May 25, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on May 28, 1979. The modification of the reactor installation is the increase of spent fuel storage capacity from about 220% of in-core fuel at present to about 325%. The fundamental philosophy of the safety evaluation includes the following items; 1) the storage capacity of spent fuel is adequate, 2) the design is such that the criticality is prevented under any assumed condition, 3) the sufficient cooling capacity is kept for decay heat removal, 4) and others required for the safety. The contents of the safety examination for each philosophical item written above are presented. The increased spent fuel storage capacity is equivalent to the quantity produced in about eight years. The prevention of criticality in the spent fuel storage is carefully practiced by putting fuel assemblies in the stainless steel racks with large neutron absorption cross section and locating spent fuel assemblies at the proper distances. The effective multiplication factor is less than 0.95 at the most severe arrangement in the fuel pool. The water temperature in the pool is less than 65 deg C at about 325% core storage by operating the spent fuel pool water cooling system. The spent fuel storage racks are designed as the A class aseismatic structure. (Nakai, Y.)

  14. Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Myhre, Joergen Chr.

    2001-07-01

    This study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating. The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time. Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load. Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system. Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis

  15. Combined production of hydrogen and power from heavy oil gasification: Pinch analysis, thermodynamic and economic evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Domenichini, R.; Gallio, M. [Foster Wheeler Italiana Spa, via Caboto 1, 20094 Corsico (Milano) (Italy); Lazzaretto, A. [University of Padova, Department of Mechanical Engineering, via Venezia 1, 35131 Padova (Italy)

    2010-05-15

    Integrated Gasification Combined Cycle (IGCC) represents a commercially proven technology available for the combined production of hydrogen and electricity power from coal and heavy residue oils. When associated with CO{sub 2} capture and sequestration facilities, the IGCC plant gives an answer to the search for a clean and environmentally compatible use of high sulphur and heavy metal contents fuels, the possibility of installing large size plants for competitive electric power and hydrogen production, and a low cost of CO{sub 2} avoidance. The paper describes two new and realistic configurations of IGCC plant fed by refinery heavy residues and including a CO{sub 2} capture section, which are proposed on the basis of the experience gained in the construction of similar plants. They are based on oxygen blown entrained bed gasification and sized to produce a large amount of hydrogen and to feed one or two gas turbines of the combined cycle unit. The main thermodynamic and technological characteristics of the total plants are evaluated focusing on the heat integration between syngas cooling and combined cycle sections. Moreover, the overall performance characteristics and investment cost are estimated to supply a reliable estimate for the cost of electricity, given a value for the hydrogen selling price. (author)

  16. Combined production of hydrogen and power from heavy oil gasification: Pinch analysis, thermodynamic and economic evaluations

    International Nuclear Information System (INIS)

    Domenichini, R.; Gallio, M.; Lazzaretto, A.

    2010-01-01

    Integrated Gasification Combined Cycle (IGCC) represents a commercially proven technology available for the combined production of hydrogen and electricity power from coal and heavy residue oils. When associated with CO 2 capture and sequestration facilities, the IGCC plant gives an answer to the search for a clean and environmentally compatible use of high sulphur and heavy metal contents fuels, the possibility of installing large size plants for competitive electric power and hydrogen production, and a low cost of CO 2 avoidance. The paper describes two new and realistic configurations of IGCC plant fed by refinery heavy residues and including a CO 2 capture section, which are proposed on the basis of the experience gained in the construction of similar plants. They are based on oxygen blown entrained bed gasification and sized to produce a large amount of hydrogen and to feed one or two gas turbines of the combined cycle unit. The main thermodynamic and technological characteristics of the total plants are evaluated focusing on the heat integration between syngas cooling and combined cycle sections. Moreover, the overall performance characteristics and investment cost are estimated to supply a reliable estimate for the cost of electricity, given a value for the hydrogen selling price.

  17. Guideline for examination concerning the evaluation of safety in light water power reactor installations

    International Nuclear Information System (INIS)

    1978-01-01

    This guideline was drawn up as the guide for examination when the safety evaluation of nuclear reactors is carried out at the time of approving the installation of light water power reactors. Accordingly in case of the examination of safety, it must be confirmed that the contents of application are in conformity with this guideline. If they are in conformity, it is judged that the safety evaluation of the policy in the basic design of a reactor facility is adequate, and also that the evaluation concerning the separation from the public in surroundings is adequate as the condition of location of the reactor facility. This guideline is concerned with light water power reactors now in use, but the basic concept may be the reference for the examination of the other types of reactors. If such a case occurs that the safety evaluation does not conform to this guideline, it is not excluded when the appropriate reason is clarified. The purpose of safety evaluation, the scope to be evaluated, the selection of the events to be evaluated, the criteria for judgement, the matters taken into consideration at the time of analysis, the concrete events of abnormal transient change and accident in operation, and the concrete events of serious accident and hypothetic accident are stipulated. The explanation and two appendices are attached. (Kako, I.)

  18. A new mix of power for the ESO installations in Chile: greener, more reliable, cheaper

    Science.gov (United States)

    Filippi, G.; Tamai, R.; Kalaitzoglou, D.; Wild, W.; Delorme, A.; Rioseco, D.

    2016-07-01

    The highest sky quality demands for astronomical research impose to locate observatories often in areas not easily reached by the existing power infrastructures. At the same time, availability and cost of power is a primary factor for sustainable operations. Power may also be a potential source for CO2 pollution. As part of its green initiatives, ESO is in the process of replacing the power sources for its own, La Silla and Paranal-Armazones, and shared, ALMA, installations in Chile in order to provide them with more reliable, affordable, and smaller CO2 footprint power solutions. The connectivity to the Chilean interconnected power systems (grid) which is to extensively use Non-Conventional Renewable Energy (NCRE) as well as the use of less polluting fuels wherever self-generation cannot be avoided are key building blocks for the solutions selected for every site. In addition, considerations such as the environmental impact and - if required - the partnership with other entities have also to be taken into account. After years of preparatory work to which the Chilean Authorities provided great help and support, ESO has now launched an articulated program to upgrade the existing agreements/facilities in i) the La Silla Observatory, from free to regulated grid client status due to an agreement with a Solar Farm private initiative, in ii) the Paranal-Armazones Observatory, from local generation using liquefied petroleum gas (LPG) to connection to the grid which is to extensively use NCRE, and last but not least, in iii) the ALMA Observatory where ESO participates together with North American and East Asian partners, from replacing the LPG as fuel for the turbine local generation system with the use of less polluting natural gas (NG) supplied by a pipe connection to eliminate the pollution caused by the LPG trucks (currently 1 LPG truck from the VIII region, Bio Bio, to the II region, ALMA and back every day, for a total of 3000km). The technologies used and the status

  19. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  20. Analysis of Energy and Power Generation in a Photovoltaic Micro installation Interconnected with a Low Voltage Grid

    Directory of Open Access Journals (Sweden)

    Marian Sobierajski

    2015-12-01

    Full Text Available The paper discusses the performance of the 15 kW photovoltaic micro installation located on the roof of building D-1 of the Faculty of Electrical Engineering at Wroclaw University of Technology. The micro installation is connected to the low voltage grid, which supplies the new, air-conditioned building D-20. The paper discusses the energy and power generation output in yearly, monthly, and daily intervals. The micro installation’s output in the summer morning peaks is compared with the daily wind generation against the background of the demand, generation, regulation reserve, and overhauls in the National Power System.

  1. On alteration of reactor installation (additional installation of No.3 and No.4 plants in the Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc.)

    International Nuclear Information System (INIS)

    1985-01-01

    The Nuclear Safty Commission sent the reply to the Minister of International Trade and Industry on October 4, 1984, on this matter after having received the report from the Committee on Examination of Nuclear Reactor Safety and carried out the deliberation. It was judged that the applicant has the technical capability required for installing and operating these reactor facilities. Also it was judged that on the safety after these reactor plants are installed, there is no obstacle in the prevention of disaster due to contaminated substances and reactors. The policy of the investigation and deliberation is reported. The contents of the investigation and deliberation are the condition of location such as site, geological features and ground, earthquake, weather, hydraulic problem and social environments, the safety design of reactor facilities, the evaluation of radiation exposure dose in normal operation, the analysis of abnormal transient change in operation, accident analysis and the evaluation of location. (Kako, I.)

  2. Technoeconomic Evaluation for an Installed Small-Scale Photovoltaic Power Plant

    Directory of Open Access Journals (Sweden)

    Bulent Yaniktepe

    2017-01-01

    Full Text Available Solar energy production and economic evaluation are analyzed, in this study, by using daily solar radiation and average temperature data which are measured for 3 years in the Osmaniye province in Turkey. Besides, this study utilizes the photovoltaic- (PV- based grid connected to a power plant which has an installed capacity of 1 MW investment in electricity production. Economic values show that the net present value (NPV, the first economic method in the research, is about 111941 USD, which is greater than zero. Therefore, the payback year of this investment is approximately 8.3. The second one of these methods, the payback period of the simple payback period (PBP, is 6.27 years. The last method, which is the mean value of the internal rate of return (IRR, is 10.36%. The results of this study show that Osmaniye is a considerable region for the PV investment in electricity production. As a result, investment of a PV system in Osmaniye can be applicable.

  3. Study of Formosa's electrical offer for installing a commercial nuclear power plant

    International Nuclear Information System (INIS)

    Torino Araoz, Ines; Parera, Maria D.

    2011-01-01

    Within the specific agreement for the siting study of the CAREM nuclear power plant in Formosa Province, signed between the National Atomic Energy Commission and the Government of Formosa, a detailed study of electrical supply was conducted in order to analyze the requirements and the electricity supply as a result of its future installation. This topic is part of the analysis developed in the Level II of the site survey study. The analysis focuses on a plan for long-term projections from 2005 to 2030, using the IAEA’s MESSAGE model (Model for Energy Supply Strategy Alternatives and Their General Environmental Impacts). The existing electrical infrastructure and the plans for expansion of transmission and distribution lines, the generation technologies and the electricity flows with the provinces and neighboring countries have been taken into account. The study was based on the evaluation of two site scenarios based on the availability of infrastructure in the province and the conclusions obtained in the Level I of the siting study. The modelling results indicate that the current situation that characterizes the Province as a net importer of electricity will be reversed due to the operation of the nuclear plant since 2019. However, it is important to note that to keep Formosa’s feature as an electricity exporter from the year 2026, according to the less favorable scenario (highest demand), ongoing energy planning and investment in the province will be done. (author) [es

  4. Test location Guetsch, Switzerland for wind-power installations; Teststandort fuer Windkraftanlagen Guetsch. Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Schaffner, B.; Cattin, R.; Schilter, Ch.

    2007-07-15

    This illustrated technical report for the Swiss Federal Office of Energy (SFOE) describes work done on the preliminary project for providing test facilities for wind-power installations on the 'Guetsch' location in the Swiss Alps. In the context of the Alpine Test Site Guetsch project, which involves meteorological measurements and wind turbine performance analysis research, a comprehensive infrastructure for the acquisition of climate data and the performance of wind turbines has been defined. This work is to be carried out by the Swiss Federal Office of Meteorology and Climatology MeteoSwiss and the company Meteotest within the framework of the COST Action 727 2005 - 2008 of the European Union. The aim of this preliminary study is to identify the possibilities for the realisation of an alpine test site for wind turbines based on the existing infrastructure. The economic and technical conditions for the testing of both large and small wind turbines are discussed. Topics examined include site ownership and access, infrastructure and measurement systems, financing possibilities and a timeline for implementation.

  5. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  6. Recycling of residual IGCC slags and their benefits as degreasers in ceramics.

    Science.gov (United States)

    Iglesias Martín, I; Acosta Echeverría, A; García-Romero, E

    2013-11-15

    This work studies the evolution of IGCC slag grains within a ceramic matrix fired at different temperatures to investigate the effect of using IGCC slag as a degreaser. Pressed ceramic specimens from two clay mixtures are used in this study. The M1 mixture is composed of standard clays, whereas the M2 mixture is composed of the same clay mixture as M1 mixture but contains 15% by weight IGCC slag. The amount of IGCC slag added coincides with the amount of slag typically used as a degreaser in the ceramic industry. Specimens are fired at 950 °C, 1000 °C, 1050 °C, 1100 °C and 1150 °C. The mineralogical composition and the IGCC slag grain shape within the ceramic matrix are determined by X-ray diffraction, polarized light microscopy and scanning electron microscopy. The results reveal that the surface of the slag grains is welded to the ceramic matrix while the quartz grains are separated, which causes increased water absorption and reduces the mechanical strength. IGCC slag, however, reduces water absorption. This behaviour is due to the softening temperature of the slag. This property is quite important from an industrial viewpoint because IGCC slag can serve as an alternative to traditional degreasing agents in the ceramic building industry. Additionally, using IGCC slag allows for the transformation of waste into a secondary raw material, thereby avoiding disposal at landfills; moreover, these industrial wastes are made inert and improve the properties of ceramics. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. Installation modification of the reactor No.2 of Ikata nuclear power plant of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1980-01-01

    The application was made on August 25, 1979, from the president of the Shikoku Electric Power Company, Inc., to the Minister of International Trade and Industry, relating to the installation modification of the reactor No. 2 in the Ikata nuclear power plant. The inquiry was submitted on September 28, 1979, from the Minister of International Trade and Industry to the Nuclear Safety Commission, after the safety evaluation in the Ministry of International Trade and Industry, and the investigation and deliberation were started on October 1, 1979, in the Nuclear Safety Commission. The content of the modification is to add the circuit actuated by the abnormal low pressure signal of the reactor to the actuating circuit of the emergency core cooling system (ECCS) and to increase the new fuel storage capacity from about 1/3 core to about 2/3 core. The additional signal circuit is composed of the logic circuit of ''2 out of 4'' and is multichannel design. The circuit is independent from the reactor control system and the conventional signal circuit of the concurrence of low pressure in the reactor and low level in the pressurizer. With the addition of the circuit of abnormal low pressure signal of the reactor, the countermeasures for preventing ECCS start by mistake are also added. These modifications give no influence to the functions of the reactor control system and reactor protection system. The function and the performance of ECCS were analyzed and evaluated accompanying these modifications assuming the loss of coolant accident. Concerning the new fuel storage capacity, the type of racks is modified from angle type to can type, and the subcriticality is kept even at the time of water flood. (Nakai, Y.)

  8. Process, background and design criteria of the gas cleaning at Puertollano IGCC

    Energy Technology Data Exchange (ETDEWEB)

    Pisa, J. [Elcogas, Madrid (Spain)

    1998-11-01

    The Puertollano IGCC plant selected cooling by a water-tube boiler with upstream quenching at high velocities that requires a dust-free cooling gas at not less than 250{degree}C in order not to penalise the heat recovery efficiency. A filtration system for gas dedusting in the 250{degree}C temperature range has been installed and will be commissioned at the end of 1997. The gas cleaning concept is completed with a Venturi Scrubber, a COS hydrolysis reactor and a MDEA column to strip the sulphuric acid to yield clean gas. The gasification island is based upon the PRENFLO system which is an entrained-flow system with dry feeding. The selection of the filter system arrangement considered the limited operational experience in comparable operating conditions and acknowledged the flexibility of the filter system versus the cyclone-scrubber as far as easier load variation operation, the reduction of residues needing deposition and increased slag flow, as well as easier maintenance. Additionally to the ceramic test filters in Furstenhausen (PRENFLO) and Deer Park near Houston (SHELL), ceramic candle-type filter were selected in Buggenum and at Wabash River, and for the KoBra plant. The main criteria for the selection of the filter system and the type of candle were: separation efficiency to match clean gas limits; uniform distribution of the dust-laden gas to the filters; wear-resistant routing of the dust-laden gas flow; need for a supporting structure which must cope with sudden pressure fluctuations; optimised pulse gas system; and maintenance and repair. Based upon the above criteria, the PRENFLO concept requirements and the gas turbine specification, an arrangement with two pressure filter vessels with LLB design and filter elements manufactured by Schumacher has been installed in Puertollano. 2 figs., 3 tabs.

  9. From the first nuclear power plant to fourth-generation nuclear power installations [on the 60th anniversary of the World's First nuclear power plant

    Science.gov (United States)

    Rachkov, V. I.; Kalyakin, S. G.; Kukharchuk, O. F.; Orlov, Yu. I.; Sorokin, A. P.

    2014-05-01

    Successful commissioning in the 1954 of the World's First nuclear power plant constructed at the Institute for Physics and Power Engineering (IPPE) in Obninsk signaled a turn from military programs to peaceful utilization of atomic energy. Up to the decommissioning of this plant, the AM reactor served as one of the main reactor bases on which neutron-physical investigations and investigations in solid state physics were carried out, fuel rods and electricity generating channels were tested, and isotope products were bred. The plant served as a center for training Soviet and foreign specialists on nuclear power plants, the personnel of the Lenin nuclear-powered icebreaker, and others. The IPPE development history is linked with the names of I.V. Kurchatov, A.I. Leipunskii, D.I. Blokhintsev, A.P. Aleksandrov, and E.P. Slavskii. More than 120 projects of various nuclear power installations were developed under the scientific leadership of the IPPE for submarine, terrestrial, and space applications, including two water-cooled power units at the Beloyarsk NPP in Ural, the Bilibino nuclear cogeneration station in Chukotka, crawler-mounted transportable TES-3 power station, the BN-350 reactor in Kazakhstan, and the BN-600 power unit at the Beloyarsk NPP. Owing to efforts taken on implementing the program for developing fast-neutron reactors, Russia occupied leading positions around the world in this field. All this time, IPPE specialists worked on elaborating the principles of energy supertechnologies of the 21st century. New large experimental installations have been put in operation, including the nuclear-laser setup B, the EGP-15 accelerator, the large physical setup BFS, the high-pressure setup SVD-2; scientific, engineering, and technological schools have been established in the field of high- and intermediate-energy nuclear physics, electrostatic accelerators of multicharge ions, plasma processes in thermionic converters and nuclear-pumped lasers, physics of compact

  10. Air intake device for at least one stand-by aggregate installed in an emergency power supply building

    International Nuclear Information System (INIS)

    Stoll, A.; Schilling, R.

    1980-01-01

    Stand-by aggregates are installed in an energency power supply building in order to ensure the cooling of nuclear power plants during accidents. In order to assure the stand-by aggregates to be supplied with combustion air also in the case of fire, each stand-by aggregate is provided with two intake pipes for the combustion air, which are horizontally lead through the building wall on the opposite sides of the energency power supply building. Fire valves are incorporated in the inlet pipes, and one of them will always close in the case of fire. (orig.) [de

  11. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  12. Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in COAL IGCC Powerplants

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2004-09-30

    The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, has been re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for Coal IGCC powerplants. The new program has been re-titled as ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants'' to better match the new scope. This technical progress report summarizes the work accomplished in the reporting period April 1, 2004 to August 31, 2004 on the revised Re-Directed and De-Scoped program activity. The program Tasks are: Task 1--IGCC Environmental Impact on high Temperature Materials: This first materials task has been refocused to address Coal IGCC environmental impacts on high temperature materials use in gas turbines and remains in the program. This task will screen material performance and quantify the effects of high temperature erosion and corrosion of hot gas path materials in Coal IGCC applications. The materials of interest will include those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: This second task develops and demonstrates new sensor technologies to determine the in-service health of advanced technology Coal IGCC powerplants, and remains in the program with a reduced scope. Its focus is now on only two critical sensor need areas for advanced Coal IGCC gas turbines: (1) Fuel Quality Sensor for detection of fuel impurities that could lead to rapid component degradation, and a Fuel Heating Value Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware.

  13. Analog Fixed Maximum Power Point Control for a PWM Step-downConverter for Water Pumping Installations

    DEFF Research Database (Denmark)

    Beltran, H.; Perez, E.; Chen, Zhe

    2009-01-01

    This paper describes a Fixed Maximum Power Point analog control used in a step-down Pulse Width Modulated power converter. The DC/DC converter drives a DC motor used in small water pumping installations, without any electric storage device. The power supply is provided by PV panels working around....... The proposed Optimal Power Point fix voltage control system is analyzed in comparison to other complex controls....... their maximum power point, with a fixed operating voltage value. The control circuit implementation is not only simple and cheap, but also robust and reliable. System protections and adjustments are also proposed. Simulations and hardware are reported in the paper for a 150W water pumping application system...

  14. Study: control of atomic energy power plant; Etude de la regulation d'une installation atomique productrice d'energie

    Energy Technology Data Exchange (ETDEWEB)

    Dautray, R; Leny, J C [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    We are studying the control of a very flexible atomic power plant, able to supply an independent network. Two systems have been examined: in the first the moderator pre-heats the light water, in the second, this preheating is dispensed with, subsequent to a study of the dynamics of the plant. Very complete linear approximation study is being effected on the model of the second system, all effects being taken into account. The reactor is stable at all power levels, though slight reactivity or load variations cause undamped power oscillations around the equilibrium level. (author)Fren. [French] Nous etudions la regulation d'une installation atomique d'une grande souplesse, pouvant eventuellement fournir de l'energie a un reseau isole. Deux versions de l'installation sont etudiees: dans la premiere le moderateur sert a rechauffer l'eau industrielle, mais l'etude dynamique conduit a supprimer ce rechauffage, ce qui donne la deuxieme version. On effectue sur celle-ci une etude en approximation lineaire tres complete ou l'on tient compte de differents effets. L'installation se montre stable a tous les niveaux de puissance. Toutefois, de petites perturbations de reactivite ou de charge entrainent des oscillations de puissance mal amorties autour de la position d'equilibre. (auteur)

  15. Experience in installing a microprocessor-based protection system on a UK nuclear power plant

    International Nuclear Information System (INIS)

    Jones, C.D.; Smith, I.C.

    1993-01-01

    This paper describes a recently completed project to install a microprocessor-based reactor protection system on a twin reactor station in the United Kingdom. This represented the first application of digital technology as part of such a system in the UK. The background of the application and details of the chosen solution are provided. The experience gained during the installation, commissioning and early operation of the equipment is reviewed by the operators. Interactions between the utility and the regulatory body are outlined and the impact of the regulatory process on the utility's resources and the project timescales are discussed

  16. Remote monitoring of solar and wind power installation via GSN and Internet; Sistema de telegestion de instalaciones solares y eolicas a traves de GSN e Internet

    Energy Technology Data Exchange (ETDEWEB)

    Caballero, P. M. L.; Valmaseda, J. C. T.; Uruena, H. J. C.; Bujedo, L. A. N.

    2004-07-01

    Remote monitoring of solar and wind power installations is important for installers since some local rules oblige them to keep a maintenance plan, and the installations are normally sparse. It is also important for end users because they demand more information about the system and management capacity each time. In this paper we present CARTIF's development for the company ENERPAL to fulfil these needs. It is formed by two subsystems: one for data acquisition and control of the installations via GSM, and the other, a server software that allows the user to access her installation remotely through the Internet in order to manage it. (Author)

  17. Study on the installation of the evacuation guide signs in a nuclear power plant

    International Nuclear Information System (INIS)

    Matsui, Yuko; Hamasaki, Kenichi; Ohuchi, Hiroko; Akagi, Shigefumi;; Sato, Takeyoshi

    2005-01-01

    In order to study the desirable sign system that leads people to the proper evacuation behavior in the nuclear plant, an experiment was conducted by using 3D simulation of a part of the nuclear buildings. As the condition of the experiment, 3 different simulations on the type of guide signs and the height of installation were provided. Participants in the experiment were asked: to reach the emergency exit as quickly as possible in case of the imaginary fire, to report the signs utilized for finding the way during his evacuation, and to evaluate their comprehensibility to evaluate synthetically each installation and guide sings from the view point of comprehensibility. Synthetic evaluation was highly rated when we indicated the signs on the face of the floor additionally and installed the guide signs at a height of 1000mm above the floor. For the individual guide sign, it tended to evaluate mostly comprehensible that the pathway guide sign was installed at 1,000mm above the floor, though it did not reach a statistical significant level. Furthermore, the necessity was suggested to take into consideration on the spatial relationship between a moving person and the guide signs. (author)

  18. Co-benefits of including CCS projects in the CDM in India's power sector

    International Nuclear Information System (INIS)

    Eto, R.; Murata, A.; Uchiyama, Y.; Okajima, K.

    2013-01-01

    This study examines the effects of the inclusion of the co-benefits on the potential installed capacity of carbon dioxide capture and storage (CCS) projects with a linear programming model by the clean development mechanism (CDM) in India's power sector. It is investigated how different marginal damage costs of air pollutants affect the potential installed capacity of CCS projects in the CDM with a scenario analysis. Three results are found from this analysis. First, large quantity of IGCC with CCS becomes realizable when the certified emission reduction (CER) prices are above US$56/tCO 2 in the integrated Northern, Eastern, Western, and North-Eastern regional grids (NEWNE) and above US $49/tCO 2 in the Southern grid. Second, including co-benefits contributes to decrease CO 2 emissions and air pollutants with introduction of IGCC with CCS in the CDM at lower CER prices. Third, the effects of the co-benefits are limited in the case of CCS because CCS reduces larger amount of CO 2 emissions than that of air pollutants. Total marginal damage costs of air pollutants of US$250/t and US$200/t lead to CER prices of US$1/tCO 2 reduction in the NEWNE grid and the Southern grid. - Highlights: • We estimate effects of co-benefits on installed capacity of CCS projects in the CDM. • We develop a linear programming (LP) model of two grids of India. • Including co-benefits contributes to introduce IGCC with CCS in the CDM at lower CER prices

  19. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.

    2008-05-01

    This report focuses on key trends in the U.S. wind power market, with an emphasis on the latest year, and presents a wealth of data, some of which has not historically been mined by wind power analysts.

  20. Prediction of power fluctuation classes for photovoltaic installations and potential benefits of dynamic reserve allocation

    NARCIS (Netherlands)

    Nijhuis, M.; Rawn, B.G.; Gibescu, M.

    2014-01-01

    During partly cloudy conditions, the power delivered by a photovoltaic array can easily fluctuate by three quarters of its rated power in 10 s. Fluctuations from photovoltaics of this size and on this time scale may necessitate adding an additional component to power system secondary and primary

  1. Analysis of the potential of small hydro-power installations - Preliminary study on hydro-power schemes on rivers; Programm Kleinwasserkraftwerke. Potenzialanalyse Kleinwasserkraftwerke - Vorstudie zu Kraftwerken an Fliessgewaessern

    Energy Technology Data Exchange (ETDEWEB)

    Baur, M.; Dettli, R. [econcept AG, Zuerich (Switzerland); Weingartner, R.; Viviroli, D.; Imhof, P.; Faessler, M.; Gerhardinger, H. [University of Berne, Geographisches Institut, Gruppe fuer Hydrologie (GIUB), Berne (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results obtained from an analysis of the potential of small hydro-power installations in Switzerland. The current situation is reviewed and a 'bottom-up' analysis of the potential available is made. Data is presented on the potential of installations with power-ratings above and below 300 kW. Cantonal case-studies are examined. In a further 'top-down' examination, flow-rates and height-differences are looked at. The development of a 'potential-map' for Switzerland is described. The report is completed with the presentation of the conclusions made from the work. Suggestions for further work that could be done on the subject are made.

  2. The Power Behind the Controversy: Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High Voltage Power Line Installation in the State of Arkansas

    Science.gov (United States)

    Moyer, Rachael M.

    Following a proposal for the installation of high voltage power lines in northwest Arkansas, a controversial policy debate emerged. Proponents of the transmission line argue that such an installation is inevitable and necessary to efficiently and reliably support the identified electric load in the region. Opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. This study seeks to understand how local policy elites perceive the benefits and risks associated with proposed transmission lines, which is a critical step in comprehending the formation and changes of related government policies. First, based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high voltage power lines among local policy elites in the state of Arkansas. Next, this study focuses more specifically on the role of value predispositions, specific emotional dimensions of affect heuristics, and perceptions pertaining to high voltage power line risks and benefits. Using original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, other factors claimed by previous literature, including trust, knowledge level, and demographic characteristics are considered. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly -- through affective feelings -- shape perceived utility associated with the installation of high voltage power lines. Recognizing that risk perceptions factor into policy decisions, some practical considerations for better designing policy addressing controversial issues

  3. Model Development for Power System Analysis with a Substantial Wind Energy Capacity Installed in the Nordic grid

    DEFF Research Database (Denmark)

    Carlson, Ola; Perdana, Abram; Chen, Peiyuan

    2011-01-01

    The worldwide development of wind power installations now includes planning and construction of large-scale wind farms ranging in magnitudes of 1000 MW and more. As part of the planning and design of such systems, it is well established that the transient and dynamic stability of the electrical...... power system needs to be studied. Modelling work of the electrical behaviour of wind turbines and wind farms as well as model validation by measurements have been important parts of this project work. The models have been used to study dynamic phenomena during normal operation and fault occasions...... in the electric system. Fault Ride Through (FRT) measurements have been carried out on new wind parks connected to Estonian power grid and in all of them FRT tests were made. In several wind parks the tests were not successful and the tests will be repeated. In Finland measurements have carried out in 6 MW...

  4. Assessing the effect of nuclear power installation construction and operation on the socio-economic sphere

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    A demographic analysis is made of the area within 25 km from the Dukovany nuclear power plant. The problem is discussed of sources and requirements for manpower for the construction and operation of the power plant. It was found that the capacity of creches and nursery schools for children of power plant employees is inadequate, as are health care facilities for personnel. (E.S.)

  5. Cost-Benefit Analysis of a Biomass Power Plant in Morocco and a Photovoltaic Installation in Algeria

    Energy Technology Data Exchange (ETDEWEB)

    Galan, A.; Gonzalez Leal, J.; Varela, M.

    1999-07-01

    This report presents an overview of cost-benefit analysis general methodology, describing its principles and basic characteristics. This methodology was applied to two case studies analyzed in the project INTERSUDMED, one biomass power plant fed by energy crops in El Hajeb (Morocco) and the other a photovoltaic installation in Djanet (Algeria). Both cases have been selected among the ones analyzed in the INTERSUDMED Project because of their interesting social implications and possible alternatives, that make them most suitable for cost-benefit analysis application. Finally, this report addresses the conclusions of both studies and summarizes the most relevant obtained results. (Author) 13 refs.

  6. Cost-Benefit Analysis of a Biomass Power Plant in Morocco and a Photovoltaic Installation in Algeria

    International Nuclear Information System (INIS)

    Galan, A.; Gonzalez Leal, J.; Varela, M.

    1999-01-01

    This report presents an overview of cost-benefit analysis general methodology, describing its principles and basic characteristics. This methodology was applied to two case studies analyzed in the project INTERSUDMED, one biomass power plant fed by energy crops in El Hajeb (Morocco) and the other a photovoltaic installation in Djanet (Algeria). Both cases have been selected among the ones analyzed in the INTERSUDMED Project because of their interesting social implications and possible alternatives, that make them most suitable for cost-benefit analysis application. Finally, this report addresses the conclusions of both studies and summarizes the most relevant obtained results. (Author) 13 refs

  7. The Effect of Flow Swirling on the Safety and Reliability of Nuclear Power Installations of New Generation

    Science.gov (United States)

    Mitrofanova, O. V.; Ivlev, O. A.; Urtenov, D. S.

    2018-03-01

    Hydrodynamics and heat exchange in the elements of thermal hydraulic tracts of ship nuclear reactors of the new generation were numerically simulated in this work. Parts of the coolant circuit in the collector and piping systems with geometries that may lead to generation of stable large-scale vortexes, causing a wide range of acoustic oscillations of the coolant, were selected as modeling objects. The purpose of the research is to develop principles of physical and mathematical modeling for scientific substantiation of optimal layout solutions that ensure enhanced operational life of icebreaker’s nuclear power installations of new generation with reactors of integral type.

  8. To Estimation of Efficient Usage of Organic Fuel in the Cycle of Steam Power Installations

    Directory of Open Access Journals (Sweden)

    A. P. Nesenchuk

    2013-01-01

    Full Text Available Tendencies of power engineering development in the world were shown in this article. There were carried out the thermodynamic Analysis of efficient usage of different types of fuel. This article shows the obtained result, which reflects that low-calorie fuel (from the point of thermodynamics is more efficient to use at steam power stations then high-energy fuel.

  9. Alteration in reactor installation (addition of Unit 2) in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. (inquiry)

    International Nuclear Information System (INIS)

    1983-01-01

    An inquiry was made by the Ministry of International Trade and Industry to Nuclear Safety Commission on the addition of Unit 2 in Shimane Nuclear Power Station of The Chugoku Electric Power Co., Inc., concerning the technical capability of Chugoku Electric Power Co., Inc., and the plant safety. The NSC requested the Committee on Examination of Reactor Safety to make a deliberation on this subject. Both the technical capability and the safety of Unit 1 were already confirmed by MITI. Unit 2 to be newly added in the Shimane Nuclear Power Station is a BWR power plant with electric output of 820 MW. The examination made by MITI is described: the technical capability of Chugoku Electric Power Co., Inc., the safety of Unit 2 about its siting, reactor proper, reactor cooling system, radioactive waste management, etc. (J.P.N.)

  10. Dose received during work in the active zone of the BIBLIS power plant, instalment A, 1977

    International Nuclear Information System (INIS)

    Kallmeyer, D.; Ambros, R.; Schroeder, H.J.; Kausch, S.

    1978-01-01

    In the Biblis station, instalment A, of the Rheinisch-Wesfaelisches-Elektrizitaetswerk, a study was conducted in 1977 to determine the doses received as a function of work carried out. The aim was to establish in a general study the dose which appears in each case during work on systems (or components of systems) in the active zone. An attempt was made as far as possible to relate the doses to specific occupations. This correlation is governed in two ways by conditions inherent in the organisation of the Biblis station a) maintenance and repair work are carried out under work contracts; the dose can be related to this work by the order number of the contract in question. b) Some activities, apart from maintenance and repair may be carried out without a contract. The dose which then appears is related to the type of activity concerned

  11. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  12. James A. FitzPatrick Nuclear Power Plant recirculation pumps vibration system installation and performance since July 7, 1990

    International Nuclear Information System (INIS)

    Lefter, J.

    1992-01-01

    James A. FitzPatrick recirculation pumps are vertical units consisting of General Electric 5,300 hp variable speed motors driving Byron Jackson Pumps. Speed range is from 400 rpm at 20% reactor power to 1,480 rpm at 100% power. Full speed pump output is 42,500 gpm at 530 ft. head. This paper describes the vibration monitoring system. The design of this vibration monitoring system took about five months and was installed during plant refueling outage between February and May 1990. The objectives of this project were as follows: (1) document and assess the mechanical condition of each RRP during plant startup normal operation and shutdown; (2) identify any areas of operation that might be harmful to the unit; (3) perform impact testing of the proximity probe brackets to determine if any bracket resonances existed in the 0 to 20 times operating speed region (0 to 20X); (4) define and recommend Acceptance Regions in the TDM system

  13. Degradation of TBC Systems in Environments Relevant to Advanced Gas Turbines for IGCC Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, Brian [Univ. of Pittsburgh, PA (United States)

    2014-09-30

    Air plasma sprayed (APS) thermal barrier coatings (TBCs) are used to provide thermal insulation for the hottest components in gas turbines. Zirconia stabilized with 7wt% yttria (7YSZ) is the most common ceramic top coat used for turbine blades. The 7YSZ coating can be degraded from the buildup of fly-ash deposits created in the power-generation process. Fly ash from an integrated gasification combined cycle (IGCC) system can result from coal-based syngas. TBCs are also exposed to harsh gas environments containing CO2, SO2, and steam. Degradation from the combined effects of fly ash and harsh gas atmospheres has the potential to severely limit TBC lifetimes. The main objective of this study was to use lab-scale testing to systematically elucidate the interplay between prototypical deposit chemistries (i.e., ash and its constituents, K2SO4, and FeS) and environmental oxidants (i.e., O2, H2O and CO2) on the degradation behavior of advanced TBC systems. Several mechanisms of early TBC failure were identified, as were the specific fly-ash constituents responsible for degradation. The reactivity of MCrAlY bondcoats used in TBC systems was also investigated. The specific roles of oxide and sulfate components were assessed, together with the complex interplay between gas composition, deposit chemistry and alloy reactivity. Bondcoat composition design strategies to mitigate corrosion were established, particularly with regard to controlling phase constitution and the amount of reactive elements the bondcoat contains in order to achieve optimal corrosion resistance.

  14. Multi-criteria optimization for determining installation locations for the power-to-gas technologies

    OpenAIRE

    Moskalenko, Natalia; Lombardi, Pio Alessandro; Komarnicki, Przemyslaw

    2014-01-01

    The steady rise of the integration of renewable energy sources (RES) has led to a re-examination of existing energy storage technologies as well as the development of new ones, e.g. power-to-gas (P2G) technology. This technology uses surplus of electricity from RES to create the synthetic natural gas, which can be stored for long periods of time, and thus it can significantly support the integration of RES into the existing power grid and extend a system transmission capacity, which is needed...

  15. Conditions of bids relative to the electric power installations from biomass; Conditions de l'appel d'offres portant sur les installations de production d'electricite a partir de biomasse

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The conditions concern the energy and technical characteristics of the installations (primary energy, implementation region, part of the renewable energy, techniques of the electric power production, energy efficiency), the economical and financial conditions (connection, prices, involvement of the candidate), delay and industrial commissioning, weighting and prioritization principles, the nature of the resource, the environmental impact and the weighting criteria. (A.L.B.)

  16. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Bolinger, M.

    2007-05-01

    This report--the first in what is envisioned to be an ongoing annual series--attempts to fill this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2006.

  17. Modular Biopower System Providing Combined Heat and Power for DoD Installations

    Science.gov (United States)

    2013-12-01

    industry surged with new exploration and tertiary recovery techniques ( fracking and so forth). In the first quarter of 2012, we received permission to...itself on demand, with its hydraulically operated moving floor using system generated power. We required a bit less than two woodchip deliveries per

  18. Inquiry relating to modifications of reactor installation in Ikata No. 1 and 2 nuclear power plants of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Ikata No. 1 and 2 nuclear power plants of the Shikoku Electric Power Company, Inc., on February 13, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the Atomic Energy Safety Commission (AESC) on June 15, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for No. 1 plant and the modification of driving mechanism from the roller nut type to the magnetic jack type for the control rod cluster for adjusting power distribution in the No. 2 plant. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. Relating to the driving mechanism for the control rod cluster adjusting power distribution, the driving speed is not modified and the reliability is kept by carrying out the continuous operation test and the electric power black out test as the demonstration test. The magnetic jack type mechanism has the locking device to prevent reactor tripping at the time of electric power black out, and the cluster is held at the location where the cluster existed at the time of black out. (Nakai, Y.)

  19. Modelling and dynamic simulation of processes with 'MATLAB'. An application of a natural gas installation in a power plant

    International Nuclear Information System (INIS)

    Gonzalez-Bustamante, J.A.; Sala, J.M.; Lopez-Gonzalez, L.M.; Miguez, J.L.; Flores, I.

    2007-01-01

    In this paper, it is proposed to incorporate the analysis of the dynamic performance of the process into the design and engineering stage of projects as a means of analysing and resolving this type of problem. The following contributions are made with this objective in mind:(a)The barriers in the way of dynamic analysis are identified. (b)Software tools which make dynamic analysis accessible during the design and engineering phase of the project are proposed. To achieve this goal, modelling and mathematical simulation are used, with the following features: *strict modelling of mass, momentum and energy conservation equations as well as state equations, and *utilisation of the 'Matlab-Simulink' package as the base-software tool. (c)The procedure and tool proposed for dynamic analysis during the design phase should enable these studies to be carried out at a reasonable cost and time for regular industrial projects, and not just for large research projects or nuclear power plants. To complete this paper, we apply our method to a natural gas installation in a power plant. The model is applied to study the transients of a natural gas supply line to a steam-electric power plant. The results of the model have been validated with the actual data on the boiler trip obtained from the distributed control system of a steam-electric power plant

  20. Arguments for the installation of small LWR nuclear power plants in developing countries

    International Nuclear Information System (INIS)

    Lezenik, B.

    1977-01-01

    The differences disclosed in the IAEA-Report ''Market Survey...'' before and after the drastic increase of the oil price in 1973 indicate most unequivocally the growing economic profits of the application of nuclear power plants with smaller output. The report furthermore demonstrates in clear terms the benefits of a long-term fuel arrangement as is applied for nuclear power plants. Following these basic considerations, according to which the construction of nuclear power plants appears to be reasonable, economically speaking, the next important criterion having priority, as far as the technical aspect is concerned, is the question concerning the largest possible unit to be integrated into the grid. So as to ensure a steady mains power supply, the structure of operating power plant types, their number and unit sizes as well as their controllability and load-following behavior have to be coordinated with one another individually. As an example for the nuclear power plant Borssele (450 MW - PWR) which has been in operation since 1973, basic control concepts are outlined which together with the load-following behavior of this reactor meet the grid requirements. This is to demonstrate the flexible application of this reactor type. Manufacturing and operating experience as well as the accumulated know-how concerning design and construction of large plants in the 1200/1300 MW class offer a broad basis for the standardization of the smaller LWR-plants. The experience gained with proven components and approved systems for the fully standardized 1200/1300 MW reactors equally guarantees operating reliability and availability, since differences in output are realized by means of additive modifications of the primary system components. A comparison with, and an interpretation of, the essential design data outline the progress achieved in the standardization process. So as to ensure as efficient as possible implementation of the construction procedure, and the application of

  1. Location of Swedish wind power—Random or not? A quantitative analysis of differences in installed wind power capacity across Swedish municipalities

    International Nuclear Information System (INIS)

    Ek, Kristina; Persson, Lars; Johansson, Maria; Waldo, Åsa

    2013-01-01

    The amount of installed wind power varies significantly across municipalities although the financial support for wind power production and the technology available is identical in all Swedish municipalities. This study analyses how local differences between municipalities, such as local wind prerequisites and socioeconomic conditions, might explain the establishment of wind power. The analysis is carried out for a cross section of Swedish municipalities. The time periods before and after 2006 are analyzed separately; and results reveal that the factors affecting wind power establishments are different between the two periods. In the later time period we found a statistically significant positive relationship between good wind resources and the presence of wind power as well as with the amount of wind energy installed. This result is consistent with the idea that the first wind power investments in Sweden were highly affected by individual wind energy enthusiasts, while in the more recent large-scale investments market-based judgments about future profitability may have become increasingly important. In addition, previous experience seems to be a factor that in itself facilitates additional future wind power establishments, thereby pointing to the role of accumulated institutional capacity. - Highlights: ► Local differences in installed wind power capacity in Sweden is analysed. ► The amount of installed wind power capacity varies significantly in time and space. ► Results reveal different determinants of installed capacity before/after 2006. ► Good wind resources have become increasingly important over time. ► Previous experience of wind power has a positive impact on installed capacity

  2. Power supply system for COMPASS tokamak re-installed at the IPP, Prague

    Czech Academy of Sciences Publication Activity Database

    Zajac, Jaromír; Pánek, Radomír; Žáček, František; Vlček, Jiří; Hron, Martin; Křivská, Alena; Hauptmann, R.; Daněk, M.; Šimek, J.; Prosek, J.

    2009-01-01

    Roč. 84, 7-11 (2009), s. 2020-2024 ISSN 0920-3796. [Symposium on Fusion Technology /25th./. Rostock, 15.09.2008-19.09.2008] Institutional research plan: CEZ:AV0Z20430508 Keywords : Compass * Power supply system * Flywheel-generator * Plasma start-up Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 1.122, year: 2009 http://dx.doi.org/10.1016/j.fusengdes.2008.11.092

  3. Examination of Maximum Power Point Tracking on the EV for Installing on Windmill

    OpenAIRE

    雪田, 和人; 細江, 忠司; 小田切, 雄也; 後藤, 泰之; 一柳, 勝宏

    2006-01-01

    This paper proposes that wind generator system is operated by using wind collection equipment and Maximum Power Point Tracking more and more high-efficient. As an example of the utility, it was proposed that it was used for the regeneration of electric vehicle. The efficiency upgrading of electric vehicle can be expect by introducing in addition, proposing system with the conventional regeneration. The field experiment was carried out in order to measure the effect. Regeneration energy by pro...

  4. Wind power generation plant installed on cargo ship and marine resources recovery by seawater electrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Murahara, M. [Tokyo Inst. of Technology, Tokyo (Japan)]|[Tokai Univ., Hiratsuka, Kanagawa (Japan); Seki, K. [Mingdao Univ., Taiwan (China)]|[Tokai Univ., Hiratsuka, Kanagawa (Japan). Research Inst. of Science and Technology

    2008-07-01

    Transmission loss from offshore wind turbine arrays is directly proportional to the length of the cable that brings power onshore. In order to minimize transmission loss, wind-generated electricity needs to be stored temporarily in a different form. Seawater, rock salt, and water of saline lakes can be desalinated and then electrolyzed to produce hydrogen. This paper presented a new method of offshore sodium production in Japan by seawater electrolysis. In this technique, sodium is manufactured on site by molten-salt electrolysis as a solid fuel. Sodium is electrolytically collected from the seawater or rock salt by the wind power generation. The sodium is then transported to a hydrogen power plant on land and then is added water to generate hydrogen for operating a hydrogen combustion turbine. The sodium hydroxide by-product is then supplied to the soda industry as a raw material. In seawater electrolysis, not only sodium but also fresh water, magnesium, calcium, potassium, sodium hydroxide, chlorine, oxygen, hydrogen, hydrochloric acid, and sulfuric acid are isolated and recovered as by-products. 5 refs., 6 figs.

  5. Concerning installation of reactor at Noto nuclear power plant of Hokuriku Electric Power Co., Inc. (reply to inquiry)

    International Nuclear Information System (INIS)

    1988-01-01

    In response to an inquiry on the conformity of the title issue to the applicable law concerning nuclear material, nuclear fuel and nuclear reactor, the Nuclear Safety Commission ordered the Nuclear Reactor Safety Expert Group to make a study, made an examination after receiving a report from the Group, and submit the findings to the Minister of International Trade and Industry. The study on the site conditions covered the site location, geology, effects or earthquakes, meteorology, hydrology and social environment. The study on the safety design of the reactor covered the design of the facilities as a whole, anti-earthquake design, reactor, instrumentation, reactor shutdown system, reactivity control, protection, cooling system, reactor vessel, fuel handling, fuel storage, and radiation control. The study also included exposure evaluation, abnormal transient state analysis and accident analysis. It is concluded that the relevant company has a technical capability required for the installation and proper operation of the reactor in question, and that the reactor will have adequate safety with no possibility of causing a disaster. (Nogami, K.)

  6. Impact of size and distribution of installed PV power in E-W direction on the level in which selected consumers’ energy needs were met

    Directory of Open Access Journals (Sweden)

    Necka Krzysztof

    2018-01-01

    Full Text Available The aim of the study was to analyse the energy needs of selected consumers and to select the PV installed capacity in the east and west panels orientation (E-W. The analysis was carried out for two variants. The first concerned the impact of the installation power of a PV source on the contracted power in its symmetric east and west position. The second variant was the result of previous observations and studies of the authors of this paper. Thus, in this variant, the unbalanced power of PV E-W in relation to the S azimuth has been analyzed, taking into account the characteristics of the recipients' needs and the variation of the PV power installed. The analyses show that an increase in meeting the energy demand for two of the tested plants at symmetrical power distribution to the east and west occurred only when the installed power was increased to the level of approx. 1.4-1.6 of the contracted power. However, the power distribution in the E-W direction has a very strong effect on the energy amount that is generated in the power plant and cannot be used due to the lack of demand in the plant.

  7. Seismic-safe conditions of blasting near pressure pipe-lines during power installation construction

    International Nuclear Information System (INIS)

    Smolij, N.I.; Nikitin, A.S.

    1980-01-01

    Seismic-safe conditions for performing drill-blasting operations in the vicinity of underground gas pipelines when constructing thermal- or nuclear power plants are discussed. It is shown that, for the determination of seismic-safe parameters, of drill-blasting operations, the maximum permissible level of seismic loads should be specified taking into account the mechanical properties of the pipeline.metal, structural parameters of the gas pipeline and the pressure of the medium transported. Besides, the seismic effect of the blast should be considered with regard to particular conditions of blasting and rock properties. The equations and diagrams used in the calculation are given

  8. S-300, new pulsed power installation in Kurchatov Institute, investigation of the stable liner implosion

    Energy Technology Data Exchange (ETDEWEB)

    Chernenko, A S; Gorbulin, Yu M; Kalinin, Yu G; Kingsep, A S; Koba, Yu V; Korolev, V D; Mizhiritskij, V I; Rudakov, L I [Kurchatov Inst., Moscow (Russian Federation)

    1997-12-31

    S-300 is a new 8-module pulsed power machine capable of delivering the total current of up to 6 MA to the optimized load. The goal of the reported first series of experiments was to study in detail the physics of the liner implosion, the Rayleigh-Taylor instability and the Hall instability of a hollow imploding cylindrical plasma shell in particular. The characteristics of various liner instabilities observed under different experimental conditions are discussed. An attempt is made to identify them on the base of existing theoretical notions. (J.U.). 4 figs., 4 refs.

  9. Installation and evaluation of a nuclear power plant Operator Advisor based on artificial intelligence technology

    International Nuclear Information System (INIS)

    Hajek, B.K.; Miller, D.W.

    1993-02-01

    The Artificial Intelligence Group in the Nuclear Engineering Program has designed and built an Operator Advisor (OA), an AI system to monitor nuclear power plant parameters, detect component and system malfunctions, dispose their causes, and provide the plant operators with the correct procedures for mitigating the consequences of the malfunctions. It then monitors performance of the procedures, and provides backup steps when specific operator actions fail. The OA has been implemented on Sun 4 workstations in Common Lisp, and has been interfaced to run in real time on the Perry Nuclear Power Plant full-function simulator in the plant training department. The eventual goal for a fully functioning Operator Advisor would be to have reactor operators receive direction for all plant operations. Such a goal requires considerable testing of the system within limited malfunction boundaries, an extensive Verification ampersand Validation (V ampersand V) effort, a large knowledge base development effort, and development of tools as part of the system to automate its maintenance. Clearly, these efforts are beyond the scope of the feasibility effort expended during this project period. However, as a result of this project, we have an AI based platform upon which a complete system can be built

  10. Impact of size and distribution of installed PV power in E-W direction on the level in which selected consumers’ energy needs were met

    OpenAIRE

    Necka Krzysztof; Latala Hubert; Kurpaska Sławomir; Knaga Jarosław; Karbowniczakʼ Anna

    2018-01-01

    The aim of the study was to analyse the energy needs of selected consumers and to select the PV installed capacity in the east and west panels orientation (E-W). The analysis was carried out for two variants. The first concerned the impact of the installation power of a PV source on the contracted power in its symmetric east and west position. The second variant was the result of previous observations and studies of the authors of this paper. Thus, in this variant, the unbalanced power of PV ...

  11. Quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    1975-04-01

    This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. (U.S.)

  12. Supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    This standard sets forth the supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel for nuclear power plant construction. The requirements may also be extended to other appropriate parts of nuclear power plants when specified in contract documents. This standard is intended to be used in conjunction with ANSI N45.2

  13. Probes for inspections of heat exchanges installed at nuclear power plants type PWR by eddy current method

    International Nuclear Information System (INIS)

    Silva, Alonso F.O.

    2007-01-01

    From all non destructive examination methods usable to perform integrity evaluation of critical equipment installed at nuclear power plants (NPP), eddy current test (ET) may be considered the most important one, when examining heat exchangers. For its application, special probes and reference calibration standards are employed. In pressurized water reactor (PWR) NPPs, a particularly critical equipment is the steam generator (SG), a huge heat exchanger that contains thousands of U-bend thin wall tubes. Due to its severe working conditions (pressure and temperature), that component is periodically examined by means of ET. In this paper a revision of the operating fundamentals of the main ET probes, used to perform SG inspections is presented. (author)

  14. Technical-parameter calculation model for underground low-power electrical lines and indoor installations used in telecommunications

    Directory of Open Access Journals (Sweden)

    Henry Bastidas Mora

    2011-09-01

    Full Text Available This article presents an analysis of electrical distribution theory for 60Hz-lines operating at low voltage, particularly underground lines and residential indoor installations. Such distribution lines’ behaviour is observed as a function of frequency to consider any advantages regarding the potential use of power transmission lines (PTL for transmitting telecommunication signals. A method for computing the secondary parameters is proposed which has been based on the primary parameters, namely inductance, capacitance, conductance and resistance. The secondary parameters so obtained were characteristic impedance, propagation constant (together with its real value and the attenuation constant. Conductor configurations, insulation materials and gauges commonly used in Colombia were verified for such low-voltage lines. A mathematical model is proposed as a theoretical tool for analysing and predicting characteristic impedance pattern and the attenuations which occur at high frequencies, thereby complementing our group’s previous work. Conclusions are drawn, together with a perspective regarding future work and applications.

  15. SMiRT 23. 14{sup th} international seminar on fire safety in nuclear power plants and installations

    Energy Technology Data Exchange (ETDEWEB)

    Roewekamp, Marina (ed.) [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany); Berg, Heinz-Peter [Bundesamt fuer Strahlenschutz, Salzgitter (Germany)

    2015-12-15

    In the frame of the project 3614R01575 funded by the German Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (Bundesministerium fuer Umwelt, Naturschutz, Bau und Reaktorsicherheit, BMUB) the meanwhile fourteenth international seminar on ''Fire Safety in Nuclear Power Plants and Installations'' has been conducted as P ost-Conference Seminar of the 23{sup rd} International Conference on Structural Mechanics In Reactor Technology (SMiRT 23) in Salford, United Kingdom in August 2015. The following seminar proceedings contain the entire twenty-one technical contributions to the two day s seminar with in total fifty-five participants from ten countries in Asia, Europe and America.

  16. Mechanical damage due to corrosion of parts of pump technology and valves of LWR power installations

    International Nuclear Information System (INIS)

    Hron, J.; Krumpl, M.

    1986-01-01

    Two types are described of uneven corrosion of austenitic chromium-nickel steel: pitting and slit corrosion. The occurrence of slit corrosion is typical of parts of pumping technology and valves. The corrosion damage of austenitic chromium-nickel steels spreads as intergranular, transgranular or mixed corrosion. In nuclear power facilities with LWR's, intergranular corrosion is due to chlorides and sulphur compounds while transgranular corrosion is due to the presence of dissolved oxygen and chlorides. In mechanically stressed parts, stress corrosion takes place. The recommended procedures are discussed of reducing the corrosion-mechanical damage of pumping equipment of light water reactors during design, production and assembly. During the service of the equipment, corrosion cracks are detected using nondestructive methods and surface cracks are repaired by grinding and welding. (E.S.)

  17. Installation Of 2MW Wind Power Plant In Northern Cyprus Technical Economical And Environmental Analysis

    Directory of Open Access Journals (Sweden)

    Aliyu Aliyu

    2017-11-01

    Full Text Available The impetus for the work presented here arose from the fact that the demand for renewable energy grows and the supply of the non-renewable energy is at the decreasing level. An increasing percentage of total energy produced globally is moving to renewable forms. Wind energy enjoys increasing deployment for power generation due to the economic benefits associated with it.Turkish Republic of Northern Cyprus TRNC has abundance of renewable energy it has an average wind speed of 4.30ms and 5.04ms at 10m and 50m respectively. The economic analysis of is plant shows that the wind farm has an investment cost of 2300000 with 333217.8 as annual savings. The simple payback was calculated to be 7 years the savings to investment ratio was found to be 3.62 the net present value turn to be positive while the return on investment was 14.48.

  18. Hydro-power installation at Fein-Elast Grabher AG in Lichtensteig - Preliminary study; Fein-Elast Grabher AG - Lichtensteig. Stauwehr / Schleusenbruecke / Wasserkraftanlage. Vorprojektstudie - Technischer Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Hintermann, M.

    2008-07-01

    This technical report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of a hydro-power plant on the River Thur in Lichtensteig, Switzerland. The new installation is to produce more power by using a greater volume of water than the old installation, parts of which date from 1820. The report reviews possibilities for and restrictions on the renewal of the installation and recommends one of four possible variants proposed.. Water-flow statistics and flood-protection issues are discussed. Environmental issues connected with the project are also examined. Energy production figures, cost estimates and economic viability issues are discussed. The proposed course of events involved in replacing the hydropower installation and an associated road bridge is described.

  19. Designed for extreme weather conditions. Installation ship for wind power plants; Fuer extreme Wetterlagen ausgelegt. Installationsschiff fuer Windenergieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Wedel, Henning von [Waertsilae Deutschland GmbH, Hamburg (Germany)

    2012-02-13

    In recent years, Waertsilaehas gained a leadership position of special ships for the installation of wind turbines. The high-performance turbine installation ship Seawolf (HPTIV) is the latest in this series.

  20. Risk zoning around nuclear power plants in comparison to other major hazardous industrial installations

    International Nuclear Information System (INIS)

    Kirchsteiger, Christian

    2006-01-01

    The background and current status of the information basis leading to the definition of risk and emergency zones around Nuclear Power Plants (NPPs) in different countries in Europe and beyond are analysed. Although dependable plant-specific Probabilistic Safety Assessment (PSA) of Level 2 and/or Level 3 could in principle provide sufficiently detailed input to define the geographical dimension of a NPP's risk and emergency zones, the analysis of the status in some European and other countries shows that other, 'deterministic' approaches using a Reference Accident are actually used in practice. Regarding use of Level 2 PSA for emergency planning, the approach so far has been to use the Level 2 PSA information retrospectively to provide the justification for the choice of Reference Accident(s) used to define the emergency plans and Emergency Planning Zones (EPZs). There are significant differences in the EPZs that are defined in different countries, ranging from about 1 km to 30 km. Further, there is a striking contrast in the extent of using probabilistic information to define emergency zones between the nuclear and other high risk industry sectors, such as the chemical process industry, and the reasons for these differences are not entirely clear, but seem to be more related to risk perception than actual risk potential. Finally, based on consensus discussions at a recent JRC/OECD International Seminar on Risk and Emergency Zoning around NPPs, recommendations are given in the areas of more comprehensive use of available risk information for risk zoning purposes, risk communication and comparative risk assessment. (author)

  1. IGCC and PFBC By-Products: Generation, Characteristics, and Management Practices

    Energy Technology Data Exchange (ETDEWEB)

    Pflughoeft-Hassett, D.F.

    1997-09-01

    The following report is a compilation of data on by-products/wastes from clean coal technologies, specifically integrated gasification combined cycle (IGCC) and pressurized fluidized-bed combustion (PFBC). DOE had two objectives in providing this information to EPA: (1) to familiarize EPA with the DOE CCT program, CCT by-products, and the associated efforts by DOE contractors in the area of CCT by-product management and (2) to provide information that will facilitate EPA's effort by complementing similar reports from industry groups, including CIBO (Council of Industrial Boiler Owners) and EEI USWAG (Edison Electric Institute Utility Solid Waste Activities Group). The EERC cooperated and coordinated with DOE CCT contractors and industry groups to provide the most accurate and complete data on IGCC and PFBC by-products, although these technologies are only now being demonstrated on the commercial scale through the DOE CCT program.

  2. Development of advanced air-blown entrained-flow two-stage bituminous coal IGCC gasifier

    Directory of Open Access Journals (Sweden)

    Abaimov Nikolay A.

    2017-01-01

    Full Text Available Integrated gasification combined cycle (IGCC technology has two main advantages: high efficiency, and low levels of harmful emissions. Key element of IGCC is gasifier, which converts solid fuel into a combustible synthesis gas. One of the most promising gasifiers is air-blown entrained-flow two-stage bituminous coal gasifier developed by Mitsubishi Heavy Industries (MHI. The most obvious way to develop advanced gasifier is improvement of commercial-scale 1700 t/d MHI gasifier using the computational fluid dynamics (CFD method. Modernization of commercial-scale 1700 t/d MHI gasifier is made by changing the regime parameters in order to improve its cold gas efficiency (CGE and environmental performance, namely H2/CO ratio. The first change is supply of high temperature (900°C steam in gasifier second stage. And the second change is additional heating of blast air to 900°C.

  3. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.H. [Duke Power Co., Seneca, SC (United States)

    1995-04-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT{trademark} Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS.

  4. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    International Nuclear Information System (INIS)

    Miller, M.H.

    1995-01-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT trademark Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS

  5. Novel findings about management of gastric cancer: A summary from 10th IGCC

    OpenAIRE

    Penon, Danila; Cito, Letizia; Giordano, Antonio

    2014-01-01

    The Tenth International Gastric Cancer Congress (IGCC) was held in Verona, Italy, from June 19 to 22, 2013. The meeting enclosed various aspects of stomach tumor management, including both tightly clinical approaches, and topics more related to basic research. Moreover, an overview on gastrointestinal stromal tumors was provided too, although here not discussed. Here we will discuss some topics related to molecular biology of gastric cancer (GC), inherent to prognostic, diagnostic and therape...

  6. Modification of reactor installation in the Takahama nuclear power plants No.1 and No.2 of Kansai Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 24, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Takahama nuclear power plants No. 1 and No. 2 of the Kansai Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kansai Electric Power Company, Inc., to the Minister of International Trade and Industry on July 23, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit for transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  7. Inquiry relating to modifications of reactor installation in Genkai No. 1 and 2 nuclear power plants of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Genkai No. 1 and 2 nuclear power plants, Kyushu Electric Power Company, Inc., on February 27, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on June 15, 1979 from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for each plant, the new establishment of a miscellaneous solid waste incinerator which is common to both plants, and the enlargement of a solid waste storage which is also common to both plants. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. The miscellaneous solid waste incinerator building is designed as the B class aseismatic structure and also as the controlled area with adequate shielding and ventilating facilities. The decontamination factor of the incinerator facility is more than 10 5 , and the necessary monitoring system is provided in the building. Concerning the solid waste storage, the additional storage area is about 1600 m 2 , and the storage capacity is about ten years quantity. This building is designed as the B class aseismatic structure. (Nakai, Y.)

  8. Data book on new energy technology development in FY 1997. Installations of photovoltaic (PV) power generation; Shin energy gijutsu kaihatsu kankei data shu sakusei chosa. Taiyoko hatsuden jireishu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The present survey places particular emphasis on the field of PV power generation systems, and intends to collect data on solar cell application products and PV power generation system installation cases, to classify them according to their usage and to compile a collection of case records including photographs. For the data collection, two formats have been adopted. A format for the solar cell-based products includes a picture of the product, and information on solar cell output and commercialization status. Another format for the installation of PV power systems includes a picture of the installation, and information on location, output level, system type, PV module type, owner, and date of installation. The application of solar cells was classified into 14 fields, i.e., consumer appliances, road and traffic, railroad, general industries, housing related, automobiles, agriculture, ocean development, disaster prevention and safety, amenity, developing countries, buildings, public facilities, and environment. A total of 241 valid cases have been collected. Overseas products and installation cases are often characterized by new applications and innovative design, and contain a lot of useful suggestions for promoting the spread of PV technology in Japan

  9. Exergy analysis of an IGCC design configuration for Plant Wansley

    International Nuclear Information System (INIS)

    Tsatsaronis, G.; Tawfik, T.; Lin, L.; Gallaspy, D.T.

    1989-01-01

    An integrated gasification-combined-cycle power plant design was developed for Georgia Power Company's Plant Wansley. This paper discusses the plant configuration and presents the most important results obtained from a detailed exergy analysis of the plant design. This analysis will be completed in a subsequent paper through an exergoeconomic analysis to identify design improvements for reducing the electricity cost

  10. Evaluation of the Photovoltaic System Installation Impact to an Electric Power Grid Part 1: Simulation of photovoltaic generation by applying a meteorological model

    Directory of Open Access Journals (Sweden)

    Juan Ernesto Wyss Porras

    2015-12-01

    Full Text Available The impact of the installation of a large-scale photovoltaic (PV system to the electric power grid management is analyzed numerically in this series of works. In this part 1, the solar irradiance at the target country, Guatemala, is evaluated with a weather forecasting model, and PV energy potential is estimated. From the computed potential distribution, the appropriate area for installation of a large-scale PV system is selected. This area is where the solar irradiance is large and the energy consumption regions are close by. The optimal tilted angle of the PV panels is proposed as well from the PV output simulation. The time series data of the PV output is also evaluated in this part, and it will be applied to the analysis of the impact of the PV installation to the electric power grid management in the following part of this series of works.

  11. Determination of permissible doses under the provisions of the regulations on installation and operation of reactors for power generation

    International Nuclear Information System (INIS)

    1979-01-01

    The determination is defined under the regulations on installation and operation of reactors for power generation. In the controlled area exterior radiation dose shall be 30 mili-rem for a week by the Minister of International Trade and Industry. The concentrations of radioactive materials in the air or under the water shall be permissible concentrations specified for the employees multiplied by 0.75 in average for a week. The densities of radioactive materials on the surface of the things contaminated by such materials shall be 1/10 of permissible surface densities stipulated in the table attached. Permissible exposure dose outside the inspected surrounding area is 0.5 rem for a year. Permissible surface densities are included in the table attached. Permissible accumulative dose for the employees is the figure (unit rem) calculated by the formula D = 5(N-18), when D means permissible accumulative dose and N number of the age. Permissible exposure dose is 3 rem for 3 months for the employees, 1.5 rem for a year for persons other than the employees and 12 rem for the urgent work. Permissible concentrations are defined in detail for the employees and outside the inspected surrounding area. Calculation of exposure dose in the case of interior exposure is particularly provided for. (Okada, K.)

  12. Enhancement of the Haemmerli hydro power installation in Lenzburg, Switzerland; Gemeinde Lenzburg (AG). Ausbau Kraftwerk Haemmerli - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-08-15

    This preliminary report for the Swiss Federal Office of Energy (SFOE) presents a project on the refurbishment of an old industrial small hydro installation on the Aabach stream in Lenzburg, Switzerland. The state of the existing installation is described as is the station's concession. The proposals for the renewal of this installation are described and discussed. The necessary building work and the installations required are examined. Investment costs, operating and maintenance costs and expected profitability are discussed. The report is completed with suggestions for further work.

  13. Heat Integration of the Water-Gas Shift Reaction System for Carbon Sequestration Ready IGCC Process with Chemical Looping

    Energy Technology Data Exchange (ETDEWEB)

    Juan M. Salazara; Stephen E. Zitney; Urmila M. Diwekara

    2010-01-01

    Integrated gasification combined cycle (IGCC) technology has been considered as an important alternative for efficient power systems that can reduce fuel consumption and CO2 emissions. One of the technological schemes combines water-gas shift reaction and chemical-looping combustion as post gasification techniques in order to produce sequestration-ready CO2 and potentially reduce the size of the gas turbine. However, these schemes have not been energetically integrated and process synthesis techniques can be applied to obtain an optimal flowsheet. This work studies the heat exchange network synthesis (HENS) for the water-gas shift reaction train employing a set of alternative designs provided by Aspen energy analyzer (AEA) and combined in a process superstructure that was simulated in Aspen Plus (AP). This approach allows a rigorous evaluation of the alternative designs and their combinations avoiding all the AEA simplifications (linearized models of heat exchangers). A CAPE-OPEN compliant capability which makes use of a MINLP algorithm for sequential modular simulators was employed to obtain a heat exchange network that provided a cost of energy that was 27% lower than the base case. Highly influential parameters for the pos gasification technologies (i.e. CO/steam ratio, gasifier temperature and pressure) were calculated to obtain the minimum cost of energy while chemical looping parameters (oxidation and reduction temperature) were ensured to be satisfied.

  14. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  15. Resolution 8.069/012 It approval the regulations for the installation of of great bearing structures, intended for wind power generation

    International Nuclear Information System (INIS)

    2012-01-01

    This resolution is about: regulations made by the Florida Administration, Oriental Republic of Uruguay to locate of great bearing structures intended for wind power generation.At the same time they have been included them :definition, objectives, installation rights, site areas, minimum distances, presentation, technical responsibility, maintenance, external documentation

  16. Quality assurance for safety in nuclear power plants and other nuclear installations. Code and safety guides Q1-Q14. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1996-01-01

    The code provides the basic requirements for establishing and implementing quality assurance programmes for the stages of siting, design, construction, commissioning, operation and decommissioning of nuclear power plants. These basic requirements apply to all individuals and organizations, including designers, suppliers, constructors, manufacturers and operators. The basic quality assurance requirements presented in this Code also apply, with appropriate modifications, to nuclear installations other than nuclear power plants

  17. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  18. The Origin and Role of Trust in Local Policy Elites' Perceptions of High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Tumlison, Creed; Moyer, Rachael M; Song, Geoboo

    2017-05-01

    The debate over an installation of high-voltage power lines (HVPLs) has been intense, particularly in northwest Arkansas. Detractors claim that the installation will negatively affect both the natural environment and the local economy, which contains a large tourism component. By contrast, those in favor of installing HVPLs claim that the installation is necessary in order to reliably support the increasing demand for electric power. Using original data collected from a recent statewide Internet survey of 420 local policy elites in Arkansas, this article focuses on two key aspects. First, we examine how local policy elites' perceptions of risks versus benefits of HVPL installation in their communities are influenced by their levels of trust toward information provided by various sources (e.g., energy industry, environmental groups, and government). Second, we utilize cultural theory to explain how the cultural worldviews of policy elites--specifically, egalitarianism, individualism, hierarchism, and fatalism--shape these levels of trust and HVPL benefit-risk perceptions, while controlling for other factors claimed by previous literature, including levels of knowledge on energy-related issues and demographic characteristics. In general, our analysis indicates that policy elites' value-oriented formation of HVPL benefit-risk perceptions is partially due to the influence cultural values have on trust in information sources. We conclude this article by discussing broader implications for the origin and role of trust in policy elites' decisions throughout the policy-making process. © 2016 Society for Risk Analysis.

  19. Advanced modeling and simulation of integrated gasification combined cycle power plants with CO2-capture

    International Nuclear Information System (INIS)

    Rieger, Mathias

    2014-01-01

    The objective of this thesis is to provide an extensive description of the correlations in some of the most crucial sub-processes for hard coal fired IGCC with carbon capture (CC-IGCC). For this purpose, process simulation models are developed for four industrial gasification processes, the CO-shift cycle, the acid gas removal unit, the sulfur recovery process, the gas turbine, the water-/steam cycle and the air separation unit (ASU). Process simulations clarify the influence of certain boundary conditions on plant operation, performance and economics. Based on that, a comparative benchmark of CC-IGCC concepts is conducted. Furthermore, the influence of integration between the gas turbine and the ASU is analyzed in detail. The generated findings are used to develop an advanced plant configuration with improved economics. Nevertheless, IGCC power plants with carbon capture are not found to be an economically efficient power generation technology at present day boundary conditions.

  20. Shell coal IGCCS with carbon capture: Conventional gas quench vs. innovative configurations

    International Nuclear Information System (INIS)

    Martelli, Emanuele; Kreutz, Thomas; Carbo, Michiel; Consonni, Stefano; Jansen, Daniel

    2011-01-01

    Highlights: → We aim at defining the preferred IGCC design for dry feed gasifiers with CO 2 capture. → Multiple options of syngas cooling, humidification, and WGS are considered. → Plants are designed, modeled, numerically optimized and costs are carefully assessed. → Partial water quench has poor efficiency but low capital cost, then good performance. → Gas quench with the ECN staged WGS design has the best thermo-economic performance. -- Abstract: The Shell coal integrated gasification combined cycle (IGCC) based on the gas quench system is one of the most fuel flexible and energy efficient gasification processes because is dry feed and employs high temperature syngas coolers capable of rising high pressure steam. Indeed the efficiency of a Shell IGCC with the best available technologies is calculated to be 47-48%. However the system looses many percentage points of efficiency (up to 10) when introducing carbon capture. To overcome this penalty, two approaches have been proposed. In the first, the expensive syngas coolers are replaced by a 'partial water quench' where the raw syngas stream is cooled and humidified via direct injection of hot water. This design is less costly, but also less efficient. The second approach retains syngas coolers but instead employs novel water-gas shift (WGS) configurations that requires substantially less steam to obtain the same degree of CO conversion to CO 2 , and thus increases the overall plant efficiency. We simulate and optimize these novel configurations, provide a detailed thermodynamic and economic analysis and investigate how these innovations alter the plant's efficiency, cost and complexity.

  1. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  2. Alteration of installation of reactors (alteration of No.1 and No.2 reactor facilities) in Oi Power Station, Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1984-01-01

    The Nuclear Safety Commission reported to the Minister of International Trade and Industry on October 27, 1983, that the technical capability was recognized to be adequate, and the safety after the alteration of the installation of reactors was judged to be ensured. At the time of deliberation, the guidelines for examining the safety design and safety evaluation of LWR facilities for power generation were used. Regarding the change of the degree of enrichment of replacement fuel from 3.2 to 3.4 wt.%, the limiting conditions are satisfied in the replacement core, and the nuclear design is appropriate. Eight test fuel assemblies using UO 2 pellets containing gadolinia are charged in the core of No.2 reactor, and the irradiation of two cycles is carried out. As the result of the safety examination regarding this test, the propriety of the nuclear design and mechanical design of the test fuel assemblies was confirmed. This alteration does not exert influence on the result of safety analysis made so far. This report was decided by the Committee on Examination of Reactor Safety based on the conclusion of No.26 subcommittee. (Kako, I.)

  3. The 'Alte Ziegelei' small hydro-power installation in Derendingen, Switzerland; Kleinwasserkraftwerk alte Ziegelei in Derendingen. Programm Kleinwasserkraftwerke. Erfahrungs- und Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Koehli, T.

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the experience gained with a small hydro-power installation in Derendingen, Switzerland. This unique 'micro' installation uses an archimedian screw to produce 6.8 kW of power from a head of 1.15 m and a through-flow of 800 - 1000 litres per second. Optimisation of the project is discussed as are the effects of changing water levels above and below the screw. Winter operation is described and the mounting of gratings necessary to avoid the intake of debris is discussed. Fish-passes are looked at and the effort required for maintenance is compared with that for other types of installations. An accident that occurred is analysed and the results of energy-efficiency measurements made on the installation are presented. The report is rounded off with an evaluation of the plant's performance and a review of future work to be done.

  4. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: safety environmental equipment (total system diagram, layout scheme drawing, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, outline drawing of operation control panel, operator console of the integrated load pressure control system, operator console of the integrated sequential control system, central control panel, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of cooler control panel of the main transformer, etc.), common facilities (total layout, diagram of the equipment cooling water pipe system, diagram of the fire-extinguishing water pipe system, etc.) In pictures of fabrication/installation, pictures of the following were included: gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, common facilities, etc. (NEDO)

  5. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: actual-pressure/actual-size combustor test equipment (structural drawing of exhaust temperature reducing device, structural drawing of hot air device, system diagram of piping, etc.), safety environmental equipment (total system diagram, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, front view of auxiliary panel of safety environment equipment, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of gas circuit breaker, etc.), common facilities (total layout, diagram of the nitrogen gas pipe system, system diagram of utility equipment, etc.) In pictures of fabrication/installation, pictures of the following were included: state of the construction work, gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, 66kV/6.9kV indoor switching station facilities, common facilities. (NEDO)

  6. Resolving piping analysis issues to minimize impact on installation activities during refueling outage at nuclear power plants

    International Nuclear Information System (INIS)

    Bhavnani, D.

    1996-01-01

    While it is required to maintain piping code compliance for all phases of installation activities during outages at a nuclear plant, it is equally essential to reduce challenges to the installation personnel on how plant modification work should be performed. Plant betterment activities that incorporate proposed design changes are continually implemented during the outages. Supporting analysis are performed to back these activities for operable systems. The goal is to reduce engineering and craft man-hours and minimize outage time. This paper outlines how plant modification process can be streamlined to facilitate construction teams to do their tasks that involve safety related piping. In this manner, installation can proceed by minimizing on the spot analytical effort and reduce downtime to support the proposed modifications. Examples are provided that permit performance of installation work in any sequence. Piping and hangers including the branch lines are prequalified and determined operable. The system is up front analyzed for all possible scenarios. The modification instructions in the work packages is flexible enough to permit any possible installation sequence. The benefit to this approach is large enough in the sense that valuable outage time is not extended and on site analytical work is not required

  7. Retrofitting of the hydro-power installation of Vicques, Switzerland; Rehabilitation de la centrale de Vicques, Emile Aebin SA. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    This technical report for the Swiss Federal Office of Energy (SFOE) reports on work involved in obtaining a new concession for the use of the water in the mill canal in Vicques, Switzerland on the Scheulte river. The author states that the existing concession for use is not optimal and should be optimised. A window of opportunity exists as a new river protection law requires a higher residual water flow rate and the creation of a fish passage facility. The paper discusses how the production of electrical energy could be doubled. The existing installation is described. Details of existing conduits and the installed power generator are presented. The measures proposed for the renewal of the hydro-power plant are described. An annex includes a copy of the construction plans.

  8. The photovoltaic power system of Geneva Palexpo Building 6; Installation photovoltaique sur la halle 6 de Geneva Palexpo

    Energy Technology Data Exchange (ETDEWEB)

    Keller, L.; Rhyner, R.

    2004-07-01

    A 70 kW photovoltaic installation has been constructed on the roof of the new Building 6 of Geneva Palexpo, a compound that hosts various conferences, exhibitions and sporting or other events, counting almost 1.5 million visitors a year, including the International Car Show, which alone attracts more than 700,000 visitors each year. The purpose of this installation is the indirect supply of recharging terminals for electric vehicles. The solar installation and the electric vehicle recharging terminals support an information campaign on solar energy and 'sustainable' mobility. For this purpose various explanatory signs have been placed inside the Geneva Palexpo halls and a promotional stand for renewable energy and 'sustainable' transport was placed inside the International Car Show 2003. This stand had some success: more than 4,000 people took part in the competition organised on this occasion. (author)

  9. Wind power installations in Switzerland - Regional planning basics and impact; Windkraftanlagen in der Schweiz - Raumplanerische Grundlagen und Auswirkungen - Grundlagenbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  10. Shell coal IGCCS with carbon capture. Conventional gas quench vs. innovative configurations

    Energy Technology Data Exchange (ETDEWEB)

    Martellia, E.; Consonni, S. [Politecnico di Milano, Via Scalabrini 76, Piacenza (Italy); Kreutz, T. [Princeton University, Guyot Hall, Room 129, Princeton, NJ (United States); Carbo, M.; Jansen, D. [Energy research Centre of the Netherlands ECN, P.O. Box 1, 1755 ZG, Petten (Netherlands)

    2011-11-15

    The Shell coal integrated gasification combined cycle (IGCC) based on the gas quench system is one of the most fuel flexible and energy efficient gasification processes because is dry feed and employs high temperature syngas coolers capable of rising high pressure steam. Indeed the efficiency of a Shell IGCC with the best available technologies is calculated to be 47-48%. However the system looses many percentage points of efficiency (up to 10) when introducing carbon capture. To overcome this penalty, two approaches have been proposed. In the first, the expensive syngas coolers are replaced by a 'partial water quench' where the raw syngas stream is cooled and humidified via direct injection of hot water. This design is less costly, but also less efficient. The second approach retains syngas coolers but instead employs novel water-gas shift (WGS) configurations that requires substantially less steam to obtain the same degree of CO conversion to CO2, and thus increases the overall plant efficiency. We simulate and optimize these novel configurations, provide a detailed thermodynamic and economic analysis and investigate how these innovations alter the plant's efficiency, cost and complexity.

  11. Novel findings about management of gastric cancer: a summary from 10th IGCC.

    Science.gov (United States)

    Penon, Danila; Cito, Letizia; Giordano, Antonio

    2014-07-21

    The Tenth International Gastric Cancer Congress (IGCC) was held in Verona, Italy, from June 19 to 22, 2013. The meeting enclosed various aspects of stomach tumor management, including both tightly clinical approaches, and topics more related to basic research. Moreover, an overview on gastrointestinal stromal tumors was provided too, although here not discussed. Here we will discuss some topics related to molecular biology of gastric cancer (GC), inherent to prognostic, diagnostic and therapeutic tools shown at the conference. Results about well known subjects, such as E-cadherin loss of expression/function, were presented. They revealed that other mutations of the gene were identified, showing a continuous research to improve diagnosis and prognosis of stomach tumor. Simultaneously, new possible molecular markers with an established role for other neoplasms, were discussed, such as mesothelin, stomatin-like protein 2 and Notch-1. Hence, a wide overview including both old and new diagnostic/prognostic tools was offered. Great attention was also dedicated to possible drugs to be used against GC. They included monoclonal antibodies, such as MS57-2.1, drugs used in other pathologies, such as maraviroc, and natural extracts from plants such as biflorin. We would like to contribute to summarize the most impressive studies presented at the IGCC, concerning novel findings about molecular biology of gastric cancer. Although further investigations will be necessary, it can be inferred that more and more tools were developed, so as to better face stomach neoplasms.

  12. Measuring campaign on an autonomous photovoltaic installation of 3 kW peak power; Campagne de mesures de l'installation autonome de 3,0 kWp a Soyhieres (JU)

    Energy Technology Data Exchange (ETDEWEB)

    Affolter, P.; Bezencon, B. [Solstis / SGI, Lausanne (Switzerland)

    2005-07-01

    The autonomous hybrid power generation system located at Soyhieres, northwestern Switzerland, comprises a photovoltaic array made of solar slates (SunslatesTM) and a diesel generator. The 3.0 kWp photovoltaic (PV) system is completely integrated into the roof annex of a farm producing wine according to the rules of organic agriculture. The system has been in operation since 1999 and its performance has been monitored between July 2003 and October 2004. The main results are as follows: a) the PV system operates well since its setting up and is correctly sized; b) the PV system delivers about 76% of the total annual energy demand; this sizing of the PV array leads to very seldom excess PV power generation; c) the losses of the system are mainly due to the necessity of cycling the battery (daily partial charging and discharging, that cause its warming up) and to its limited life-span, the latter resulting in a constantly decreasing efficiency for energy storage; d) the maximum power point (MPP) tracker installed on one part of the PV array does not significantly improve the power generation efficiency.

  13. Advanced modeling and simulation of integrated gasification combined cycle power plants with CO{sub 2}-capture

    Energy Technology Data Exchange (ETDEWEB)

    Rieger, Mathias

    2014-04-17

    The objective of this thesis is to provide an extensive description of the correlations in some of the most crucial sub-processes for hard coal fired IGCC with carbon capture (CC-IGCC). For this purpose, process simulation models are developed for four industrial gasification processes, the CO-shift cycle, the acid gas removal unit, the sulfur recovery process, the gas turbine, the water-/steam cycle and the air separation unit (ASU). Process simulations clarify the influence of certain boundary conditions on plant operation, performance and economics. Based on that, a comparative benchmark of CC-IGCC concepts is conducted. Furthermore, the influence of integration between the gas turbine and the ASU is analyzed in detail. The generated findings are used to develop an advanced plant configuration with improved economics. Nevertheless, IGCC power plants with carbon capture are not found to be an economically efficient power generation technology at present day boundary conditions.

  14. Change in plan for installation of nuclear reactor in No.1 atomic powered vessel of Japan Atomic Energy Research Institute (change in purpose of use and in method for nuclear reactor installation and spent fuel disposal) (report)

    International Nuclear Information System (INIS)

    1987-01-01

    This report, compiled by the Nuclear Safety Commission to be submitted to the Prime Minister, deals with studies concerning some changes in the plan for the installation of a nuclear reactor in the No.1 atomic powered vessel to be constructed under the Japan Atomic Energy Research Institute (changes in the purpose of its use and in the methods for the nuclear reactor installation and spent fuel disposal). The conclusions of and procedures for the examination and evaluation are presented and then detailes of the studies are described. The study on the location requirements for the incidental land facilities at Sekinehama covers various conditions concerning the location, geology, earthquakes, meteorology, hydrology and social environment. The study on the safety design of the nuclear reactor facilities deals with the reactor, fuel handling facilities and other auxiliary facilities, as well as various land facilities to be constructed at Sekinehama including the reactor facilities and other facilities for fuel handling, waste disposal and protection and management of radioactive rays. Evaluation of possible radiation emission is shown and the accident analysis is also addressed. (Nogami, K.)

  15. Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Moyer, Rachael M; Song, Geoboo

    2016-10-01

    Recently, a controversial policy debate has arisen concerning the installation of high-voltage power lines in northwest Arkansas. While proponents argue that such an installation is inevitable to efficiently and reliably support the identified electric load in the region, opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. Of particular interest is to understand how local policy elites perceive the benefits and risks associated with such divisive proposals, which is critical for comprehending the formation and changes of related government policies. Based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high-voltage power lines among local policy elites in the state of Arkansas. In doing so, we analyze original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, while considering other factors claimed by previous literature to influence risk perceptions, including trust, knowledge level, and demographic characteristics. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly-through affective feelings-shape perceived utility associated with the installation of high-voltage power lines. We conclude this article by suggesting some practical considerations for better designing policy addressing controversial issues of this nature. © 2016 Society for Risk Analysis.

  16. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 1/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and drawings of fabrication/installation in the FY 1989 were summarized. In fabrication/installation drawings, drawings of the following were included: layout of the total system and the yard, gasifier facilities (assembly drawing of the pressure part of gasifier, drawing of machinery arrangement of gasifier facilities, system diagram of raw coal receiving device, system diagram of pulverized coal feed equipment, system diagram of char feed equipment, etc.), gas refining facilities - dry desulfurizer (assembly drawing of desulfurizing agent carrying filter, assembly drawing of regeneration tower filter, structural drawing of SO{sub 2} reduction tower filter, assembly drawing of start-up heater, etc.), gas refining facilities - dry dust removal system (assembly drawing of No.1 dust separation filter, installation drawing of elevator, etc.), gas turbine facilities (cross section of gas turbine, front view of gas turbine, structural cross section of gas turbogenerator, etc.), actual-pressure/actual-size combustor test equipment (structural drawing of test stand, structural drawing of exhaust temperature reduction device, assembly/sectioned drawing of low-pressure air compressor, etc.) (NEDO)

  17. Projects for small hydro-power installations in the Canton of Uri, Switzerland; Kanton Uri. Projekte fuer Kleinwasserkraftwerke - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This report for the Swiss Federal Office of Energy (SFOE) on a preliminary study presents and discusses small-hydro projects at three locations in the Swiss Canton of Uri. Three of originally six potential locations were selected for further investigation. Factors such as the usable quantities of water available at the locations are discussed. The projects Brunnital, Gruonbach and Palanggenbach are discussed in detail. Water quantities and various components of the installations such as water intakes, de-sanding installations, pressure conduits, machine houses and tailrace channels are described, as is the electro-mechanical equipment proposed. Also, environmental aspects are dealt with. Annual electricity production and economic viability are further topics covered in the report.

  18. Technical development of cost-efficient installation of power distribution cables under pavements. Haiden chichuka ni okeru doboku kensetsu gorika gijutsu no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Kokusho, Koji; Kataoka, Tetsuyuki; Tanaka, Yasuyuki; Yoshida, Yasuo; Ikemi, Motoyoshi; Suzuki, Koichi; Kitano, Koichi; Kobayashi, Seiichi; Kanazu, Tsutomu; Komada, Hiroya.

    1987-12-01

    Various latest technical developments were surveyed for the cost-effective installation of power distribution cables under pavements, and their applicabilities were demonstrated with the evaluation of their cost-reduction effects. Cables in conventional vinyl protection tubes could be buried only 30cm under pavements, and in such case, the cost was reduced to 51% of those of conventional methods. As the results of soil tests, excavated soil over 80% was reusable through coarse screening. Underground radar technique to explore buried pipes from the surface was detectable several pipes buried 1.5-2.0m underground, although some problems in precision were found. The improvement of reinforced concrete man-hole structures to minimize the volume of excavated soil indicated the cost reduction of nearly 20%. The application of these techniques to the installation of cables was expected to ultimately halve the total civil engineering cost. 21 refs., 130 figs., 46 tabs.

  19. Wind power installations in Switzerland - Guidelines for the analysis of environmental impact; Eoliennes en Suisse. Guide pour l'analyse des effets sur l'environnement

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) provides guidelines concerning the impact of the construction of wind-energy installations on the environment in Switzerland. The report aims to ascertain the relevant environmental aspects of the construction of such wind turbines. If no relevant restrictions apply, the acceptance of such wind power installations is said to increase. The guidelines also recommend a standardised course of action and provide sources of information for investors that are necessary for successful planning. The results which can be obtained by using these guidelines can be used to compile a short-form report for cantonal environment protection agencies. An appendix contains an example of the structure of such a report.

  20. Wind power installations in Switzerland - Guidelines for the analysis of environmental impact; Windkraftanlagen in der Schweiz - Leitfaden fuer die Analyse der Umweltauswirkungen

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) provides guidelines concerning the impact of the construction of wind-energy installations on the environment in Switzerland. The report aims to ascertain the relevant environmental aspects of the construction of such wind turbines. If no relevant restrictions apply, the acceptance of such wind power installations is said to increase. The guidelines also recommend a standardised course of action and provide sources of information for investors that are necessary for successful planning. The results which can be obtained by using these guidelines can be used to compile a short-form report for cantonal environment protection agencies. An appendix contains an example of the structure of such a report.

  1. Technical, environmental, and economic assessment of deploying advanced coal power technologies in the Chinese context

    International Nuclear Information System (INIS)

    Zhao Lifeng; Xiao Yunhan; Gallagher, Kelly Sims; Wang Bo; Xu Xiang

    2008-01-01

    The goal of this study is to evaluate the technical, environmental, and economic dimensions of deploying advanced coal-fired power technologies in China. In particular, we estimate the differences in capital cost and overall cost of electricity (COE) for a variety of advanced coal-power technologies based on the technological and economic levels in 2006 in China. This paper explores the economic gaps between Integrated Gasification Combined Cycle (IGCC) and other advanced coal power technologies, and compares 12 different power plant configurations using advanced coal power technologies. Super critical (SC) and ultra super critical (USC) pulverized coal (PC) power generation technologies coupled with pollution control technologies can meet the emission requirements. These technologies are highly efficient, technically mature, and cost-effective. From the point of view of efficiency, SC and USC units are good choices for power industry. The net plant efficiency for IGCC has reached 45%, and it has the best environmental performance overall. The cost of IGCC is much higher, however, than that of other power generation technologies, so the development of IGCC is slow throughout the world. Incentive policies are needed if IGCC is to be deployed in China

  2. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  3. Method and system to estimate variables in an integrated gasification combined cycle (IGCC) plant

    Science.gov (United States)

    Kumar, Aditya; Shi, Ruijie; Dokucu, Mustafa

    2013-09-17

    System and method to estimate variables in an integrated gasification combined cycle (IGCC) plant are provided. The system includes a sensor suite to measure respective plant input and output variables. An extended Kalman filter (EKF) receives sensed plant input variables and includes a dynamic model to generate a plurality of plant state estimates and a covariance matrix for the state estimates. A preemptive-constraining processor is configured to preemptively constrain the state estimates and covariance matrix to be free of constraint violations. A measurement-correction processor may be configured to correct constrained state estimates and a constrained covariance matrix based on processing of sensed plant output variables. The measurement-correction processor is coupled to update the dynamic model with corrected state estimates and a corrected covariance matrix. The updated dynamic model may be configured to estimate values for at least one plant variable not originally sensed by the sensor suite.

  4. Austenitic steels of the new generation used for power plant installations with supercritical parameters and their welding

    International Nuclear Information System (INIS)

    Brozda, J.

    2006-01-01

    Combustion of bituminous coal and lignite in power boilers brings into the atmosphere a lot of contaminations. The emission of pollutants can be reduced by the application of supercritical steam parameters, which also improves the efficiency of power units, but in that case constructional materials of the new generation are needed, among them austenitic steels. The development of power units with supercritical and ultra supercritical steam parameters is presented as well as applied structural materials. Austenitic steels used in power boiler constructions are listed. Basic characteristics of austenitic steels of the new generation are given and principles of their forming and welding. (author)

  5. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  6. The creation of the analytical information system to serve the process of complex decommissioning of nuclear submarines (NSM) and surface ships (SS) with nuclear power installations (NPI)

    International Nuclear Information System (INIS)

    Terentiev, V.G.; Yakovlev, N.E.; Tyurin, A.V.

    2002-01-01

    Management of the decommissioning of nuclear vessels includes information collection, accumulation, systematisation and analysis on the complex utilization of nuclear submarines and surface ships with nuclear power installations and on treatment of spent nuclear fuel and radioactive wastes. The relevant data on radiation and ecology, science and technology, law and economy, administration and management should be properly processed. The general objective of the analytical information system (AIS) development, described in the present paper, is the efficiency upgrading for nuclear submarine utilization management and decision making. The report considers information provision and functioning principles as well as software/hardware solutions associated with the AIS creation. (author)

  7. Recommendations for the hydrogeologic review and assessment of sites for nuclear power installations within the framework of the radiation protection licensing procedure

    International Nuclear Information System (INIS)

    Adam, C.; Petschel, M.; Koerner, W.

    1985-01-01

    Article 4 of the Nuclear Facility Licensing Ordinance requires the information to be submitted in support of licensing applications for nuclear power installations to include an expertise on the hydrogeologic characteristics of the site environment with main emphasis on the movement of radionuclides through groundwater in the event of accident conditions, and on measures to protect ground and surface waters. Recommendations are given for the conduct of a hydrogeologic review and assessment process and its timing relative to the individual stages in the licensing procedure. (author)

  8. What are the costs of an accelerated installation of new onshore wind power and photovoltaic plants?; Was kostet ein schnellerer Ausbau von Wind an Land und Photovoltaik?

    Energy Technology Data Exchange (ETDEWEB)

    Nestle, Uwe [EnKliP Energie- und KlimaPolitik - Beratung, Kiel (Germany)

    2015-01-15

    The most recent amendment of the Renewable Energy Law (EEG), enacted in August 2014, was the first to set limits to the further expansion of renewable energy. However, the continued growth of production capacity from onshore wind and photovoltaic energy would actually only have a low impact on the level of the EEG surcharge. The costs that would be incurred instead through the installation of new natural gas power stations are practically the same. If production capacities from onshore wind and photovoltaic plants grow faster than envisaged by the EEG, it will bring the federal government faster towards its goal of lowering the average remuneration to below 12 cents per kWh.

  9. Basement of Structure, Main Power and Design Parameters of Mechanism of Removing Sections of Mechanized Sets of Knife Plane Installation

    Science.gov (United States)

    Sysoev, N. I.; Turuk, Yu V.; Kolesnichenko, I. Y.; Lugantsev, B. B.

    2017-10-01

    The reasons for the failure of the pitch stability of the knife-plane installation due to the action of extreme effort in the plane of the seam from the conveyor side on the mechanism of removing sections of mechanized sets are shown. The technique for determining this effort is presented. The constructions of the adaptive mechanisms of the removing sections of mechanized sets with the basements of catamaran type, in the constrictions of which elastic elements (rods) are used, are considered. The constructions of the mechanism of removing a section of the mechanized set with the basement of catamaran type in which the stock of the hydraulic jack is connected with the band loop through the movable rods intermediate basement with a link are worked out. The intermediate basement unloads the stock of the hydraulic jack of the moving installation from the side curving efforts, caused by the action of lateral forces in the plane of the seam on the conveyor side. It increases the reliability and efficiency of work of the knife plane mechanized complex.

  10. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  11. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    International Nuclear Information System (INIS)

    GREENE, G.A.; GUPPY, J.G.

    1998-01-01

    This is the final report on the INSP project entitled, ''Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant

  12. Considerations of the opinions and others in the public hearing on the alteration in reactor installation (addition of Unit 3) in the Hamaoka Nuclear Power Station of the Chubu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1982-01-01

    A public hearing was held in Hamaoka Town, Shizuoka Prefecture, on the alteration in reactor installation, i.e., the addition of Unit 3 in the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., on March 19, 1981, by the Nuclear Safety Commission. The opinions and others stated by the local people were taken into consideration in the governmental examinations on the installation, etc. The considerations of such opinions principally in the examinations by NSC are explained in the form of questions (i.e. opinion, etc.) and answers (i.e. considerations) as follows: site conditions (earthquakes, ground, hydraulic features, etc.), the safety design of the reactor facilities (overall plant, aseismic design, the control of inflammable gas concentration, radioactive waste treatment, the reflection of accident experiences, etc.), radioactive waste management, radiation exposure relation, the technical capabilities of personnel (operation, etc.). (J.P.N.)

  13. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  14. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  15. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  16. One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium

    Directory of Open Access Journals (Sweden)

    Luís G. Monteiro

    2017-02-01

    Full Text Available This paper presents results of one-year monitoring of AC side electrical parameters and the characterization of local solar radiation at the biggest rooftop PV Power Plant, with an installed capacity of 1.42 MWp, mounted at Mineirão Football Stadium in Brazil. This stadium is one of the sport facilities that hosted 2014 FIFA World Cup and Rio 2016 Summer Olympics Games in the country. Results showed how it is important to study and characterize the solar resource in the region of interest, based on historic data, to provide the understanding of solar radiation and thus project PV power plants with better performance. Furthermore, AC electrical data show the behavior of active, reactive and apparent powers and the influence of the PV system on the power factor at the local grid utility connection point. Finally, PV power plant performance data (as annual final yield, performance ratio and capacity factor are also presented and compared with data from PVsyst software simulations. The results over the monitoring period were good considering the specificities of the stadium

  17. A modular real time Operator Advisor expert system for installation on a full function nuclear power plant simulator

    International Nuclear Information System (INIS)

    Hajek, B.K.; Miller, D.W.; Bhatnagar, R.; Maresh, J.L.

    1989-01-01

    A knowledge-based expert system that uses the Generic Task approach is being developed to serve as an operator Advisor in the control room of a commercial nuclear power plant. Having identified the broad scope tasks performed by an operator in responding to abnormal plant conditions, our research team has modularized the Operator Advisor according to the tasks of (1) monitoring plant parameters, (2) classifying or diagnosing the abnormality, and (3) planning for execution of the procedures for recovery. The operator Advisor uses the Perry Nuclear Power Plant full-scope simulator as the reference system, and is currently being prepared for direct connection to the simulator

  18. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  19. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  20. A simulation study of Solid Oxide fuel cell for IGCC power generation using Aspen Plus

    DEFF Research Database (Denmark)

    Rudra, Souman; Kim, Hyung Taek

    2010-01-01

    operating conditions and using diverse fuels. The SOFC stack model developed using the chemical process flow sheet simulator Aspen Plus which is of equilibrium type and is based on Gibbs free energy minimization. The SOFC model performs heat and mass balances and considers the ohmic, activation...... with respect to a variety of SOFC inputs. SOFC stack operation on syn-gas is compared to operation on different coal properties and as expected there is a drop in performance, which is attributed to increased input fuel and air flow due to the lower quality of the fuel gas....

  1. Different scenarios to reduce greenhouse gas emissions of thermal power stations in Canada

    International Nuclear Information System (INIS)

    Zabihian, F.; Fung, A.S.

    2009-01-01

    The purpose of this paper is to examine greenhouse gas (GHG) emission reduction potentials in the Canadian electricity generation sector through fuel switching and the adoption of advanced power generation systems. To achieve this purpose, six different scenarios were introduced. In the first scenario existing power stations' fuel was switched to natural gas. Existing power plants were replaced by natural gas combined cycle (NGCC), integrated gasification combined cycle (IGCC), solid oxide fuel cell (SOFC), hybrid SOFC, and SOFC-IGCC hybrid power stations in scenarios number 2 to 6, respectively. (author)

  2. Safety at civil basic nuclear installations other than nuclear power plants in France. Lessons learned by IRSN from significant events reported in 2013 and 2014

    International Nuclear Information System (INIS)

    2016-01-01

    IRSN publishes the lessons learned from its analysis of significant events which have occurred in 2013 and 2014 at 82 civil basic nuclear installations (INBs) other than nuclear power plants (NPPs). Produced every two year since 2009, this report concerns 73 facilities such as plants, laboratories, facilities for the treatment, disposal and storage of waste, and facilities which have been decommissioned, and 9 research reactors, operated by around twenty different licensees in France. 210 and 227 significant events were respectively reported in 2013 and 2014 to the French Nuclear Safety Authority (ASN). This number remains similar to previous years and tends to 'stabilize' at around 200 to 220. On the one hand, among the improvements observed in 2013 and 2014, IRSN found two subjects of particular interest: - Efforts made by the licensees to increase reliability of organisational and human measures related to handling operations, in particular at the spent fuel reprocessing plant of AREVA NC La Hague and in the radioactive waste storage facilities operated by the CEA. - Important improvement program deployed by the licensee of the FBFC plant in Romans-sur-Isere (Drome) to enhance operating practices, particularly regarding management of criticality risks (prevention of uncontrolled chain reactions). On the other hand, three subjects still require special vigilance by licensees: - Ensuring full control over the safety documentation of facilities. IRSN's cross-cutting analysis of events reveal a large number of cases for which parts of the safety documentation are not fully understood at the facilities, are not applied, are inaccurate or not applicable to the situation. - Ensuring in-depth and comprehensive planning of installation clean-up and dismantling operations. Risks of worker exposure to ionising radiation are higher during these operations which may require personnel to work in close proximity to radioactive materials. - Ensuring more

  3. Conditions of the call for tenders on the electric power production installations from biomass and biogas; Conditions de l'appel d'offres portant sur les installations de production d'electricite a partir de biomasse et de biogaz

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    These conditions concern: the energetic and technical characteristics of the installations as the fraction of the non renewable energy, the electric power production technic, the power and the energy efficiency; the industrial implementing delay; the exploitation and the operating time; the weighting and the classification principles. (A.L.B.)

  4. Choice of optimum size of installations for dual-purpose production of desalted water and electricity, using nuclear power

    International Nuclear Information System (INIS)

    Gaussens, J.

    1966-01-01

    The author used a method starting with water and power demand curves; this leads to the rational allocation of production costs to water and power within a given market. The power demand curve is needed as it seems improbable to sell at a constant price the enormous quantity of electricity produced by a dual purpose plant. Criteria based on principles of classical economics, help to select objectively desalination methods and plant sizes. On these criteria, normative methods for tariffing action of water and power can be based, while adhering as closely as possible to structure of demand. Examples of such criteria are the maximum profit of the supplier or the maximum satisfaction of the consumers taken collectively. In the first case marginal costs must be equated to marginal revenue, in the second one marginal cost to marginal satisfaction (theory of surpluses). The plant size often determines the choice of desalination process. Therefore the shape of the water demand curve and the economic criterion adopted (public or private ownership, capital restrictions etc.) often determine in this way both size and type of plant. Before deciding on the desalination technique, market surveys and rather subtle economic analyses are therefore necessary. (author) [fr

  5. Model Based Optimal Sensor Network Design for Condition Monitoring in an IGCC Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Rajeeva; Kumar, Aditya; Dai, Dan; Seenumani, Gayathri; Down, John; Lopez, Rodrigo

    2012-12-31

    This report summarizes the achievements and final results of this program. The objective of this program is to develop a general model-based sensor network design methodology and tools to address key issues in the design of an optimal sensor network configuration: the type, location and number of sensors used in a network, for online condition monitoring. In particular, the focus in this work is to develop software tools for optimal sensor placement (OSP) and use these tools to design optimal sensor network configuration for online condition monitoring of gasifier refractory wear and radiant syngas cooler (RSC) fouling. The methodology developed will be applicable to sensing system design for online condition monitoring for broad range of applications. The overall approach consists of (i) defining condition monitoring requirement in terms of OSP and mapping these requirements in mathematical terms for OSP algorithm, (ii) analyzing trade-off of alternate OSP algorithms, down selecting the most relevant ones and developing them for IGCC applications (iii) enhancing the gasifier and RSC models as required by OSP algorithms, (iv) applying the developed OSP algorithm to design the optimal sensor network required for the condition monitoring of an IGCC gasifier refractory and RSC fouling. Two key requirements for OSP for condition monitoring are desired precision for the monitoring variables (e.g. refractory wear) and reliability of the proposed sensor network in the presence of expected sensor failures. The OSP problem is naturally posed within a Kalman filtering approach as an integer programming problem where the key requirements of precision and reliability are imposed as constraints. The optimization is performed over the overall network cost. Based on extensive literature survey two formulations were identified as being relevant to OSP for condition monitoring; one based on LMI formulation and the other being standard INLP formulation. Various algorithms to solve

  6. Modelling and dynamic simulation of processes with 'MATLAB'. An application of a natural gas installation in a power plant

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez-Bustamante, J.A.; Sala, J.M.; Flores, I. [Escuela Superior de Ingenieros Industriales de Bilbao, Universidad del Pais Vasco, Alameda de Urquijo, s/n 48013 Bilbao (Bizkaia) (Spain); Lopez-Gonzalez, L.M. [Escuela Tecnica Superior de Ingenieria Industrial, Universidad de La Rioja, C/ Luis de Ulloa, 20. E 26004 Logrono (La Rioja) (Spain); Miguez, J.L. [Universidad de Vigo, Escuela Tecnica Superior de Ingenieros Industriales, C/Lagoas-Marcosende, s/n 36200 Vigo (Pontevedra) (Spain)

    2007-07-15

    In this paper, it is proposed to incorporate the analysis of the dynamic performance of the process into the design and engineering stage of projects as a means of analysing and resolving this type of problem. The following contributions are made with this objective in mind:(a)The barriers in the way of dynamic analysis are identified. (b)Software tools which make dynamic analysis accessible during the design and engineering phase of the project are proposed. To achieve this goal, modelling and mathematical simulation are used, with the following features: circle strict modelling of mass, momentum and energy conservation equations as well as state equations, and circle utilisation of the 'Matlab-Simulink' package as the base-software tool. (c)The procedure and tool proposed for dynamic analysis during the design phase should enable these studies to be carried out at a reasonable cost and time for regular industrial projects, and not just for large research projects or nuclear power plants. To complete this paper, we apply our method to a natural gas installation in a power plant. The model is applied to study the transients of a natural gas supply line to a steam-electric power plant. The results of the model have been validated with the actual data on the boiler trip obtained from the distributed control system of a steam-electric power plant. (author)

  7. Automatic analyzer of the coefficient of excess air and products of chemical under firing of heat and power engineering installations

    Energy Technology Data Exchange (ETDEWEB)

    Babushkin, V V; Furman, N I; Shcherban, A N; Tarasevich, V N

    1981-01-01

    A sensor of the combustion quality of gas and oil fuel in boiler furnaces which is intended to be used for automatic measurement of an excess amount of 0/sub 2/ and fuel components, and also of associated elements present in a stoichiometric ratio of 0/sub 2/ and fuel components in the waste gasses is proposed. The AST-2 fuel combustion analyzer is developed based on this sensor. It consists of a sample preparation unit of the controlled environment and a power source. The sample preparation unit is determined by the structural engineering specifics of the power unit in which the fuel combustion controlled process is carried out. The sample preparation unit, which is made for 11 open-hearth ovens of ''Azovstal''' factory, is intended for drying and purging of mechanical and aggressive impurities the samples of the gas to be analyzed and additional reagents, and also for controlling and monitoring constancy and amount of pressure, temperature, and humidity.

  8. Modular nuclear reactor for a land-based power plant and method for the fabrication installation and operation thereof

    International Nuclear Information System (INIS)

    Craig, E. R.; Blumberg, B. Jr.

    1985-01-01

    A self-contained modular nuclear reactor which can be prefabricated at a factory location, nuclear-certified at the factory, transported to a field location for final assembly and connection to a large-scale electric-power generating facility. The modular reactor includes a prefabricated nuclear heat supply module and a plurality of shell segments which can be assembled about the heat supply module and which provide a form for the pouring and curing of a cementatious biological shield about the heat supply module. The modular reactor includes passive shutdown heat removal systems sufficient to render the reactor safe in an emergency. A large-scale power plant arrangement is disclosed which incorporates a plurality of the modular reactors

  9. Input of biomass in stand-alone small-scale installations for power generation. Calculation of the financial gap

    International Nuclear Information System (INIS)

    Van Tilburg, X.; De Vries, H.J.; Pfeiffer, A.E.; Beekes, M.; Cleijne, J.W.

    2005-09-01

    A number of new initiatives in which bio-oil is used in stand-alone plants for power generation has been reviewed. The question to be answered is whether the reference case for stand alone biomass projects based on burning of wood chips can still be considered representative for the costs and benefits in this category. ECN, in cooperation with KEMA, have determined the financial gap between the costs and benefits of projects in which bio-oil is used in stand alone plants for power generation. The ranges and reference case for bio-oil in stand alone applications show that these projects have a substantially lower financial gap than the current reference case based on wood chips [nl

  10. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  11. Radiation risk from the nuclear power installation of space vehicle in case of reentry to the atmosphere

    International Nuclear Information System (INIS)

    Mikheenko, S.G.

    1994-01-01

    Main directions of space using of nuclear power are considered. Nuclear energy has found many applications in space projects. The first application is the use of nuclear energy for the production of electricity in space and the second main application is the use of nuclear power for propulsion purposes in space flight. History of usage nuclear power systems in space technic is shown. Today there are 54 satellites with NPS in space near the Earth. The main principle of radical solution of the problem of radiation safety is based on the accommodation of space objects with nuclear units in orbits, such that the ballistic lifetime is greater than the time necessary for complete decay of the accumulated radioactivity. Radiation safety on various stages of space nuclear systems exploitation is discussed. If Main System Ensuring Radiation Safety is failed, it must operates Reserved System Ensuring Radiation Safety. Concrete development of a booster system for nuclear unit and a system for the reactor destruction in order to ensure aerodynamic destruction of fuel has been realized in satellite of 'Cosmos' series. The investigations on reserved system ensuring radiation safety in Moscow Physical - Engineering Institute are discussed. The results show that we can in principle ensure the radiation safety in accordance to ICRP recommendations. (author)

  12. Enhancing the safety culture of non-power nuclear installations: Initiatives within the forum for nuclear cooperation in Asia

    International Nuclear Information System (INIS)

    Cameron, R.F.; Bastin, S.J.

    2002-01-01

    The development and application of safety culture principles has naturally focused on nuclear power plants and fuel cycle facilities and has been based on studies in Europe, North America, Japan and Korea. However, most radiation injuries and deaths have resulted from the mishandling of radioactive sources, inadvertent over-exposure to X-rays and criticality incidents, unrelated to nuclear power plant operations. Within the Forum on Nuclear Cooperation in Asia (FNCA), Australia has promoted initiatives to apply safety culture principles across all nuclear and radiation application activities and in a manner that is culturally appropriate for Asian countries. The major focus has been on research reactors and to a lesser extent on fuel cycle facilities. The process has been motivated by annual workshops, where participants have reported against agreed indicators and shared their experiences in initiating safety culture programmes in these non-power nuclear activities. This paper provides a summary of some of the outcomes and conclusions on the effectiveness of these initiatives and some experiences from reviews of incidents in the participating countries. (author)

  13. Operational experience of electron beam flue gases treatment pilot installation at the Maritsa East 2 Thermal Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Dutskinov, N. [NEK-EAD (Bulgaria)

    2011-07-01

    The electron beam flue gases treatment process is very versatile and effective technology for simultaneous removal of acidic pollutants i.e. sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) from the flue gas produced in the combustion of fossil fuel. The technology allows decomposition of VOC (volatile organic compound) such as polycyclic aromatic compound (PAC) and persistent organic pollutants (POP). The electron beam flue gases treatment technology for combustion flue gases purification was applied in Maritsa-East 2 Thermal Power Plant. The decision for construction of Electron Beam Pilot Plant at Maritsa-East 2 TPP was taken at the technical meeting in IAEA Vienna, November 1998. The flue gases of 10 000 nm³/h are irradiated by three high energy electron accelerators of 800 keV and 35 kW beam power each. The plant has been operated since November 2003. The removal efficiency 90-99% for SO{sub x} and 85-90% for NO{sub x} was observed. The quality of coals are characterised with high ash content up to 45%, high moisture up to 57%, low calorific value from 1196 kcal/kg up to 1603 kcal/kg and high concentration of sulphur. The Bulgarian lignite coals are unique in their usage as fuel for the thermal power plants in Maritsa East region. (author)

  14. Consideration of the opinions and others in the public hearing on the alteration in reactor installation (addition of Unit 2) in the Tsuruga Power Station of the Japan Atomic Power Company

    International Nuclear Information System (INIS)

    1982-01-01

    A public hearing was held in Tsuruga City, Fukui Prefecture, on the alteration in reactor installation, i.e., the addition of Unit 2 in the Tsuruga Power Station, JAPC, on November 20, 1980, by the Nuclear Safety Commission. The opinions and others stated by the local people were taken into consideration in the governmental examinations on the installation, etc. The considerations of such opinions principally in the examinations by NSC are explained in the form of questions (i.e. opinion, etc.) and answers (i.e. consideration) as follows: site conditions (site, earthquakes, ground, meteorology, siting situation, etc.), the safety design of the reactor facilities (overall plant, aseismic design, the teaching by the TMI accident in U.S., ECCS, pre-stressed concrete containment vessel, radioactive waste release, etc.), radioactive waste management, radiation exposure relation, the technical capabilities of personnel (operation, etc.). (J.P.N.)

  15. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  16. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  17. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  18. A data mining approach: Analyzing wind speed and insolation period data in Turkey for installations of wind and solar power plants

    International Nuclear Information System (INIS)

    Colak, Ilhami; Sagiroglu, Seref; Demirtas, Mehmet; Yesilbudak, Mehmet

    2013-01-01

    Highlights: ► Wind speed and insolation period data were analyzed using a data mining approach. ► Most of the studies in the literature were based on Weibull and Rayleigh models. ► Nearest and farest neighbor algorithms were used with different distance metrics. ► Many inferences were achieved in efficient limits for wind and solar farm analyses. - Abstract: Wind and solar power plant installations have been recently increased rapidly with respect to the depletion of fossil-based fuels all over the world. Due to stochastic nature of meteorological conditions, wind and solar energies have a non-schedulable nature and they require several installation analyses to determine the location and the capacities of wind and solar power to be produced. This paper focuses on the similarity, feasibility and numerical analyses of 75 cities in Turkey based on the monthly average wind speed and insolation period data. The nearest and the farest neighbor algorithms are used as agglomerative hierarchical clustering methods with Euclidean, Manhattan and Minkowski distance metrics in the stage of making the similarity and feasibility analyses. The maximum cophenetic correlation coefficient is achieved by the nearest neighbor algorithm with the Minkowski distance metric in the similarity and feasibility analyses. On the other hand, graphical representations of the monthly average wind speed and insolation period data are utilized for making the numerical analysis. The highest annual average wind speed and insolation period are obtained as 3.88 m/s and 8.45 h/day, respectively. Overall, many inferences were achieved in acceptable and efficient limits for wind and solar energy.

  19. Model of purchase contract of the electric power produced by installations which valorize the domestic wastes or equivalent, at the exception of the installations using biogas, and subjected to the electric power purchase obligation. Established in the application of the article 5 from the decree of the 10 may 2001 and approved by the ministry charged with the electric power; Modele de contrat d'achat de l'energie electrique produite par les installations qui valorisent des dechets menagers ou assimiles, a l'exception des installations utilisant du biogaz, et beneficiant l'obligation d'achat d'electricite. Etablie en application de l'article 5 du decret du 10 mai 2001 et approuve par le Ministre charge de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The text of the contract is provided presenting the general conditions and specific conditions adapted to the installation characteristics of the electric power producer: contract object, connecting to the public network, producer installation, reciprocal agreements, measure and control of the energy and power, tariffs periods, price of the bought energy, taxes, payments, contract management, validity, suspension modification or avoidance of the contract. (A.L.B.)

  20. Opening of the first CO{sub 2} capture installation on the fumes of a coal power plant - european project Castor, Denmark; Inauguration de la premiere installation de captage du CO{sub 2} sur les fumees d'une centrale electrique au charbon - Projet europeen Castor, Danemark

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    The 15 March 2006, was launched the first industrial pilot of CO{sub 2} capture of the Castor project, coordinated by the IFP and financed by the european commission, on the site of the Esbjerg (Denmark) power plant. It is the first world installation allowing the CO{sub 2} capture on the fumes of a coal power plant. This document presents the pilot installation, discusses the european project Castor, the advantages of the CO{sub 2} capture and storage for a better use of the fossil energies, where and how capturing the CO{sub 2} and the Denmark energy context. (A.L.B.)

  1. Alteration in reactor installations (Unit 1 and 2 reactor facilities) in the Hamaoka Nuclear Power Station of The Chubu Electric Power Co., Inc. (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report by the Nuclear Safety Commission to the Ministry of International Trade and Industry concerning the alteration in Unit 1 and 2 reactor facilities in the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., was presented. The technical capabilities for the alteration of reactor facilities in Chubu Electric Power Co., Inc., were confirmed to be adequate. The safety of the reactor facilities after the alteration was confirmed to be adequate. The items of examination made for the confirmation of the safety are as follows: reactor core design (nuclear design, mechanical design, mixed reactor core), the analysis of abnormal transients in operation, the analysis of various accidents, the analysis of credible accidents for site evaluation. (Mori, K.)

  2. More flexible and demand-oriented schedule operation. For market-driven power generation in biogas existing installation

    International Nuclear Information System (INIS)

    Welteke-Fabricius, Uwe

    2016-01-01

    This lecture investigates the effects of the societal framework on operators of biogas plants in the further development of biogas and its contribution to the German Energiewende. Influences are not only from politics and economy but stakeholders also shape the development to come. A visible part of the existing plants have quickly to be transformed to a demand driven supply. If not, it is most likely that biogas will disappear from the stage within some 15 years - except for waste treatment. In a future of growing wind and solar energy supply we will experience a.. of shortage and surplus within a day, and through the.seasons. Prices will fluctuate increasingly. Controllable energy generators will run for a decreasing number of hours daily. Biogas should contribute to one or two high-price periods a day, when it is dark, low wind, or high demand, but at a higher capacity than today. This pattern, in combination with a valuable use of its thermal energy production, can furthermore offer an economic feasible prospect for biogas plants after their period of subsidized EEG feed-in tariff By now, only few biogas plants are designed accordingly. Most of them produce their power continuously. Only if biogas plants will change towards peak load operation, its unique combination of renewable and controllable energy supply will be recognized, and biogas can contribute a valuable share to a sustainable energy system. Stakeholders can and should support this change.

  3. Nuclear Liability and Insurance Cover for Risk of Nuclear Power Plants - Situation for Nuclear Installations in Germany

    International Nuclear Information System (INIS)

    Boediker, T.

    1998-01-01

    A dispute about nuclear liability and insurance cover for risks of nuclear power plants from an insurer's point of view has to determine and to judge the essential risk relevant factors. These are beside plant and site specific factors considerations of insurance restrictions in the extent of cover compared with the legal scope of liability for (re-)insurability's sake. Among such consideration are: financial limitation and obligation for its reinstatement, exclusions for gradual emissions of approved activities, armed conflicts, hostilities, civil war, insurrections or grave natural disaster and restrictions in the limitation and preclusion periods. In comparison with conventional liability risks there are some specialties to be considered some of which prove to be a risk relief other as a risk burden for insurance: Salvage expenses or interests and court costs to be paid by unsuccessful party in a lost litigation do not fall under legal liability and hence are excluded from the financial security cover so that are compensation is subject to agreed separate limits. A serious burden for the insurers can result out of the loss regulation costs in case of a severe nuclear accident. These expenses, which can exceed hundred million DM by far, are to be carried by the insurers in the frame of their obligation to investigate raised claims. Therefore the insurers should aim a fixed limitation in order to restrict their limit. (author)

  4. Strategies to overcome barriers for cleaner generation technologies in small developing power systems: Sri Lanka case study

    International Nuclear Information System (INIS)

    Wijayatunga, Priyantha D.C.; Siriwardena, Kanchana; Fernando, W.J.L.S.; Shrestha, Ram M.; Attalage, Rahula A.

    2006-01-01

    The penetration of cleaner and energy efficient technologies in small power systems such as the one in Sri Lanka has encountered many problems. This has caused major concerns among the policy makers, mainly in the context of the growing need to reduce harmful emissions in the electricity supply industry from the point of view of both local environmental pollution as well as the global warming concerns. This paper presents the outcome of a study involved in identifying and ranking the barriers to the promotion of cleaner and energy efficient technologies and strategies to overcome these barriers in Sri Lanka. Barriers for renewable energy based systems such as wind and wood fuel fired plants (dendro thermal power) and cleaner technologies such as liquefied natural gas (LNG) fired combined cycle and IGCC (coal) were identified based on a survey. A direct assessment multi-criteria decision making method called Analytic Hierarchy Process (AHP) was used to rank the barriers. The most effective strategies are proposed to address the three major barriers for each of these technologies based on extensive discussions with all the stakeholders in the electricity industry. It was found that lack of financing instruments, high initial cost and lack of assurance of resource supply or availability are the main barriers for renewable technologies. As for cleaner fuel and technology options associated with conventional generation systems, the lack of a clear government policy, uncertainty of fuel supplies and their prices and the reliability of the technologies themselves are the major barriers. Strategies are identified to overcome the above barriers. Establishment of a proper feed in tariff, geographical diversification of installations and capacity building in commercial banks are suggested for wind power. Investment incentives, streamlining of wood production and research on site identification are proposed for wood fuel fired plants. Also the study suggests delayed

  5. Selection of persons expressing opinions etc. and attendants in the public hearing concerning the alteration in reactor installations (addition of Unit 3 and 4) in the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1984-01-01

    The Nuclear Safety Commission has selected 18 persons expressing opinions etc. and 255 (other) attendants for the public hearing on the alteration of reactor installations (addition of Unit 3 and 4) in Kyushu Electric's Genkai Nuclear Power Station to be held on June 18th, 1984. The order of expressing opinions etc., number of reception, names, addresses, ages and occupations are given of the persons expressing opinions etc. For both the groups, against the selected numbers there are given applicants etc. in number by towns and city. (Mori, K.)

  6. Alteration of installation of nuclear reactors (alteration of No. 1 and No. 2 reactor facilities) in Shimane Nuclear Power Station, Chugoku Electric Power Co. , Inc. (report)

    Energy Technology Data Exchange (ETDEWEB)

    1987-07-01

    The Nuclear Safety Commission reported to the Minister of International Trade and Industry after prudent deliberation on this alteration problem which had been inquired on August 28, 1986. It was recognized that the technical capability of the applicant is appropriate, as the result of deliberation. It was judged that the safety after this alteration of the installation of the reactor facilities can be ensured. As the result of examining new type 8 x 8 zirconium liner fuel, there was no problem in its mechanical design, the analysis of dynamical characteristics, and the analysis of abnormal transient change and accident in operation. As to the change of the average degree of enrichment of replacement fuel, the thermonuclear design of the reactor core was adequate. In the incineration of spent resin and filter sludge, the effect of radioactive substances to the environment was negligible. The safety after abolishing the auxiliary protection function against exhaust radioactivity is ensured with a rare gas holdup equipment. The soundness of fuel and the soundness of reactor coolant pressure boundary are maintained in abnormal transient change and accident. (Kako, I.).

  7. Alteration of installation of nuclear reactors (alteration of No.1 and No.2 reactor facilities) in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. (report)

    International Nuclear Information System (INIS)

    1987-01-01

    The Nuclear Safety Commission reported to the Minister of International Trade and Industry after prudent deliberation on this alteration problem which had been inquired on August 28, 1986. It was recognized that the technical capability of the applicant is appropriate, as the result of deliberation. It was judged that the safety after this alteration of the installation of the reactor facilities can be ensured. As the result of examining new type 8 x 8 zirconium liner fuel, there was no problem in its mechanical design, the analysis of dynamical characteristics, and the analysis of abnormal transient change and accident in operation. As to the change of the average degree of enrichment of replacement fuel, the thermonuclear design of the reactor core was adequate. In the incineration of spent resin and filter sludge, the effect of radioactive substances to the environment was negligible. The safety after abolishing the auxiliary protection function against exhaust radioactivity is ensured with a rare gas holdup equipment. The soundness of fuel and the soundness of reactor coolant pressure boundary are maintained in abnormal transient change and accident. (Kako, I.)

  8. Treatment of opinions, etc. in the public hearing on the alteration of reactor installation (addition of Unit 2) in the Shimane Nuclear Power Station of The Chugoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1983-01-01

    The Nuclear Safety Commission has acknowledged the governmental policy, and further decided on the treatment of the opinions expressed by the local people in the public hearing held in May, 1983, in Shimane Prefecture on the addition of Unit 2 to the Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. The NSC has directed the Committee on Examination of Reactor Safety to take into consideration the opinions in its later examination. The opinions expressed by the local people in the form of question are given as follows: siting conditions (earthquake, ground, weather, etc.), the safety design for reactor installation (general aspect, aseismatic design, core design, ECCS, the teaching of TMI accident, etc.), radioactive wastes, radiation exposure, site evaluation. (Mori, K.)

  9. Treatment and management of opinions stated in and notified to the public hearing on the alteration in reactor installation (addition of Unit 3) in the Hamaoka Nuclear Power Station of The Chubu Electric Power Co., Ltd

    International Nuclear Information System (INIS)

    1981-01-01

    A public hearing was made in Hamaoka Town, Shizuoka Prefecture, on March 19, 1981, on the addition of Unit 3 in the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc. Treatment and management of the opinions and others stated and notified by the local people, which are understood and to be carried out by the Nuclear Safety Commission, are: to publish them as the report of the public hearing, to include them in the safety examination report of NSC and to refer to them in the examination by the Committee on Examination of Reactor Safety, etc. The opinions and others stated and notified in the public hearing, to which CERS should refer in its examination, are summarized in the form of the questions on siting conditions, safety design of reactor installation, release of radioactivities, etc. (J.P.N.)

  10. Handling of views and opinions by staters and others in a public hearing on alteration in reactor installation (addition of Unit 2) in the Sendai Nuclear Power Station of Kyushu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1981-01-01

    A public hearing on the addition of Unit 2 in the Sendai Nuclear Power Station, Kyushu Electric Power Co., Inc., was held on July 17, 1980, in Sendai City, Kagoshima Prefecture. The views and opinions by the local staters and those by the notification of statement were expressed concerning its nuclear safety. The handling of these views and opinions by the Nuclear Safety Commission is explained. The most important in this action is the instruction by the NSC to the Committee on Examination of Reactor Safety to reflect the results of the public hearing to the reactor safety examination of the Unit 2 installation by the CERS. The views and opinions expressed in this connection are summarized as follows: the sitting conditions, the safety design of the reactor plant, and the release of radioactive materials, involving such aspects as earthquakes, accidents and radioactive waste management. (J.P.N.)

  11. Energy days: RTE opens the public the doors of more than 30 electric power transport installations in France; Journees de l'energie: RTE ouvre au public les portes de plus de 30 installations de transport d'electricite en France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    From the 14 to the 20 may 2001, the RTE (Electric power Transportation Network) proposed many visits of its installations in France to inform the public on the missions, the jobs and the participation to a durable economic development of this electric utility. This operation participates to the Energy Days organized by the Economy, Finance and Industry Department. (A.L.B.)

  12. New purchase conditions by EDF, of the electrical power produced by the energy valorization installations of domestic wastes and assimilated; Nouvelles conditions d'achat par EDF de l'electricite produite par les installations de valorisation energetique des dechets managers et assimiles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    The State Secretary for the Industry, C. Pierret, approved the new purchase conditions by EDF, concerning the electric power, produced by the installations of domestic wastes energy valorization. This action is in agreement with the energy policy. The purchase conditions are presented and commented. (A.L.B.)

  13. Unconventional Coal in Wyoming: IGCC and Gasification of Direct Coal Liquefaction Residue

    Science.gov (United States)

    Schaffers, William Clemens

    Two unconventional uses for Wyoming Powder River Basin coal were investigated in this study. The first was the use of coal fired integrated gasification combined cycle (IGCC) plants to generate electricity. Twenty-eight different scenarios were modeled using AspenPlusRTM software. These included slurry, mechanical and dried fed gasifiers; Wyodak and Green River coals, 0%, 70%, and 90% CO2 capture; and conventional evaporative vs air cooling. All of the models were constructed on a feed basis of 6,900 tons of coal per day on an "as received basis". The AspenPlus RTM results were then used to create economic models using Microsoft RTM Excel for each configuration. These models assumed a 3 year construction period and a 30 year plant life. Results for capital and operating costs, yearly income, and internal rates of return (IRR) were compared. In addition, the scenarios were evaluated to compare electricity sales prices required to obtain a 12% IRR and to determine the effects of a carbon emissions tax on the sales price. The second part of the study investigated the gasification potential of residue remaining from solvent extraction or liquefaction of Powder River Basin Coal. Coal samples from the Decker mine on the Wyoming-Montana border were extracted with tetralin at a temperature of 360°C and pressure of 250 psi. Residue from the extraction was gasified with CO2 or steam at 833°C, 900°C and 975°C at pressures of 0.1 and 0.4 MPa. Product gases were analyzed with a mass spectrometer. Results were used to determine activation energies, reaction order, reaction rates and diffusion effects. Surface area and electron microscopic analyses were also performed on char produced from the solvent extraction residue.

  14. Characteristics of Wind Power Projects in Mountainous Area and Techniques for Wind Turbine Installation%山区风电工程特点与风机吊装技术

    Institute of Scientific and Technical Information of China (English)

    张栋

    2014-01-01

    In recent years , mountains for domestic wind power development become higher , which also make the instal-lation of wind turbines a more difficult work .For wind power projects , it is now a major issue to complete the installation of wind turbines safely and efficiently on schedule .In this paper , practical experience from the second stage Luotuogou project in Hebei province is summarized .Characteristics of wind power projects in mountainous area and techniques for wind turbine installation are analyzed , which provide useful references to other wind turbine installation work in moun-tainous area .%近年来国内山区风电工程中山越来越高,风机安装难度越来越大,如何在紧张的工期下安全高效的完成风机安装,是每个风电施工企业面临的主要课题。以河北坝上骆驼沟二期风电场为例,对山区风电工程特点和风机吊装技术进行总结分析,以期对更多山区风机安装提供借鉴。

  15. Aerodynamics of Power Plant Installation

    Science.gov (United States)

    1981-09-01

    th~orique d’environ 5 % pour Ia partie instationnaire, la pricision absolue globale risultante itant, bien entendu, mains bonne ;cette precision...motorisfie done lea souffleries do 1’ONERA au Centre de MODANE-AVREEUX. En coopgration avec l’ONERA deux mithodes do simulation froide des iota. des...validit6 permet un moills’ir contr~le du nivoau absolu des masures at de ce fait sat misux adapt6e h Is comparasion de dif’ferents motaurs. E~n outre

  16. Examination policy concerning the additional installation of No. 3 and No. 4 reactors in Takahama Nuclear Power Station and No. 3 and No. 4 reactors in Fukushima No. 2 Nuclear Power Station

    International Nuclear Information System (INIS)

    1980-01-01

    The Nuclear Safety Commission decided the annual examination policy on the modification of reactor installation in Takahama Nuclear Power Station to construct No. 3 and No. 4 reactors inquired under date of November 26, 1979, by the Minister of International Trade and Industry, so that the examination results of the accident in Three Mile Island nuclear power station are reflected to the examination for the purpose of improving reactor safety. The examination results of the accident in Three Mile Island power station are being investigated by the Committee on Examination of Reactor Safety, based on the policy shown in ''On the second report of the special committee examining the accident in a nuclear power station in the U.S.'' determined by the Nuclear Safety Commission under date of September 13, 1979. Though the Committee will further clarify the past guideline about the items concerning the criteria, design and operation management, the Committee decided the tentative policy to reflect it to safety examination. Further, a table is attached, in which 52 items to be reflected to the security measures are classified from the viewpoint of necessity to reflect them to the final examination. This table includes 13 items of criteria and examination, 7 items related to design, 10 items related to operation management, 10 antidisaster items, and 12 items related to safety research. (Wakatsuki, Y.)

  17. Influence of flue gas desulfurization (FGD) installations on emission characteristics of PM2.5 from coal-fired power plants equipped with selective catalytic reduction (SCR).

    Science.gov (United States)

    Li, Zhen; Jiang, Jingkun; Ma, Zizhen; Fajardo, Oscar A; Deng, Jianguo; Duan, Lei

    2017-11-01

    Flue gas desulfurization (FGD) and selective catalytic reduction (SCR) technologies have been widely used to control the emissions of sulphur dioxide (SO 2 ) and nitrogen oxides (NO X ) from coal-fired power plants (CFPPs). Field measurements of emission characteristics of four conventional CFPPs indicated a significant increase in particulate ionic species, increasing PM 2.5 emission with FGD and SCR installations. The mean concentrations of PM 2.5 from all CFPPs tested were 3.79 ± 1.37 mg/m 3 and 5.02 ± 1.73 mg/m 3 at the FGD inlet and outlet, respectively, and the corresponding contributions of ionic species were 19.1 ± 7.7% and 38.2 ± 7.8%, respectively. The FGD was found to enhance the conversion of NH 3 slip from the SCR to NH 4 + in the PM 2.5 , together with the conversion of SO 2 to SO 4 2- , and increased the primary NH 4 + and SO 4 2- aerosol emissions by approximately 18.9 and 4.2 times, respectively. This adverse effect should be considered when updating the emission inventory of CFPPs and should draw the attention of policy-makers for future air pollution control. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. [Effects of the installation of the Rosal hydroelectric power station, Itabapoana River, States of Espírito Santo and Rio de Janeiro, on anophelinae, planorbidae and phlebotominae].

    Science.gov (United States)

    Rezende, Helder Ricas; Sessa, Paulo Augusto; Ferreira, Adelson Luiz; dos Santos, Claudiney Biral; Leite, Gustavo Rocha; Falqueto, Aloísio

    2009-01-01

    The construction of dams usually changes the composition of the fauna within their areas of influence. In the area where the Rosal hydroelectric power station has been installed, in the States of Espírito Santo and Rio de Janeiro, changes to the abundance of anophelinae, planorbidae and phlebotominae were evaluated before (1998-2000) and after (2000-2005) the damming. Nine sample collection points were defined, each represented by a home and its outbuildings, shelters for domestic animals and water collection points within a radius of 150m. One hundred and three adult anophelinae were collected before the damming and 313 afterwards; 200 immature anophelinae before and 708 afterwards; 868 planorbidae before and 486 afterwards; and 2,979 phlebotominae before and 912 afterwards. The vector record, consisting of anophelinae, planorbidae and phlebotominae, shows the potential of this area for transmission of malaria, schistosomiasis and American cutaneous leishmaniasis. However, the environmental changes did not increase the risk of the occurrence of these diseases.

  19. Should a coal-fired power plant be replaced or retrofitted?

    Energy Technology Data Exchange (ETDEWEB)

    Dalia Patino-Echeverri; Benoit Morel; Jay Apt; Chao Chen [Carnegie Mellon University, Pittsburgh, PA (USA)

    2007-12-15

    In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO{sub 2}, NOx, Hg, and CO{sub 2} using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO{sub 2} and NOx controls on the existing unit. An expectation that the CO{sub 2} price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power. 1 ref., 5 figs., 2 tabs.

  20. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  1. Low Thermal Conductivity, High Durability Thermal Barrier Coatings for IGCC Environments

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, Eric [Univ. of Connecticut, Storrs, CT (United States); Gell, Maurice [Univ. of Connecticut, Storrs, CT (United States)

    2015-01-15

    Advanced thermal barrier coatings (TBC) are crucial to improved energy efficiency in next generation gas turbine engines. The use of traditional topcoat materials, e.g. yttria-stabilized zirconia (YSZ), is limited at elevated temperatures due to (1) the accelerated undesirable phase transformations and (2) corrosive attacks by calcium-magnesium-aluminum-silicate (CMAS) deposits and moisture. The first goal of this project is to use the Solution Precursor Plasma Spray (SPPS) process to further reduce the thermal conductivity of YSZ TBCs by introducing a unique microstructural feature of layered porosity, called inter-pass boundaries (IPBs). Extensive process optimization accompanied with hundreds of spray trials as well as associated SEM cross-section and laser-flash measurements, yielded a thermal conductivity as low as 0.62 Wm⁻¹K⁻¹ in SPPS YSZ TBCs, approximately 50% reduction of APS TBCs; while other engine critical properties, such as cyclic durability, erosion resistance and sintering resistance, were characterized to be equivalent or better than APS baselines. In addition, modifications were introduced to SPPS TBCs so as to enhance their resistance to CMAS under harsh IGCC environments. Several mitigation approaches were explored, including doping the coatings with Al₂O₃ and TiO₂, applying a CMAS infiltration-inhibiting surface layer, and filling topcoat cracks with blocking substances. The efficacy of all these modifications was assessed with a set of novel CMAS-TBC interaction tests, and the moisture resistance was tested in a custom-built high-temperature moisture rig. In the end, the optimal low thermal conductivity TBC system was selected based on all evaluation tests and its processing conditions were documented. The optimal coating consisted on a thick inner layer of YSZ coating made by the SPPS process having a thermal conductivity 50% lower than standard YSZ coatings topped with a high temperature tolerant CMAS resistant gadolinium

  2. Change in plan for installation of nuclear reactor in Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in plan for No.3 and No.4 nuclear reactor facilities) (report)

    International Nuclear Information System (INIS)

    1987-01-01

    This report, compiled by the Nuclear Safety Commission to be submitted to the Minister of International Trade and Industry, deals with studies on a proposed change in the plan for the installation of nuclear reactors in the Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in the plan for the No.3 and No.4 nuclear reactor facilities). The conclusions of and principles for the examination and evaluation are described first. The studies carried out are focused on the safety of the facilities, and it is concluded that part of the proposed change is appropriate with respect to the required technical capability and that part of the change will not have adverse effects on the safety design of the facilities. The examination of the safety design of the reactor facilities cover the reactivity control, new material for the steam generator, design of chemical and volume control systems, design of liquid waste treatment facilities, integration of all confinement vessel spray rings, and design of the diesel power generator. It is confirmed that all of them can meet the safety requirements. Studies and analyses are also made of the emission of radiations to the surrounding environment, abnormal transient changes during operations, and possible accidents. (Nogami, K.)

  3. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  4. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  5. Sistema experimental para el monitoreo de instalaciones de potencia haciendo uso de la Web; Experimental System for Power Installations Samples by Using the Web

    Directory of Open Access Journals (Sweden)

    Yoel R Rosales Hernández

    2011-02-01

    Full Text Available El artículo que se presenta describe una alternativa económica de sistema de adquisición de datos parael monitoreo de una instalación de potencia eléctrica trifásica. El sistema experimental está basado en unmicrocontrolador de Intel StrongARM SA-1110 de 32 bits con CPU RISC, una memoria flash de 16 Mbyte,una memoria SDRAM de 32 Mbyte y un controlador LAN Ethernet de 10/100 Mbps entre otros elementos.El mismo tiene instalado un sistema operativo Linux (kernel versión 2.4 y un servidor web thttpd. Através de un programa CGI se logra el muestreo, procesamiento y transmisión de la información recibidadesde un sistema trifásico de potencia y a partir de un protocolo HTTP se envía toda esta información aun grupo de clientes conectados a una red convencional de computadoras.  This work focuses on an economic alternative for developing a data acquisition system which monitors athree-phase power intalation. This experimental system is made up of an Intel StrongARM SA-1110 32-bitRISC microcontroller, a 16-Mbyte flash memory chip, a 32-MByte SDRAM chip, a 10/100 Mbps EthernetLAN controller with 10BASE-T, as well as other  hardware elements. The system has an embedded Linuxoperating system (kernel version 2.4, and a thttpd embedded web server. A CGI program was designed inorder to enable the sampling, processing and transmition of information received from the three-phasepower installation. To achieve this, a HTTP protocol was used in order to send all this information to agroup of clients connected to a conventional PC network.

  6. Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald; Jacques Hugo; Bruce Hallbert

    2013-03-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator is also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.

  7. Radioactive waste warehousing site installation - INB 56, Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the installation located in Cadarache and used for radioactive waste warehousing (description, radioactive and chemical materials, specific risks, present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, margin assessment), external flooding (installation sizing, margin assessment in relationship with the different flooding origins), other extreme natural events (hail, extreme rainfalls, strong winds, lightning, and earthquake exceeding the design level), loss of electric supplies. The next parts address severe accident management (means and organization for crisis management, robustness of available means), and subcontracting conditions and practices

  8. The role of the demand-duration curve in the evaluation of power station installation policies. Remarks on its effects on stations' utilization, generating capacity, load factor history and consumptions

    International Nuclear Information System (INIS)

    Graziani, G.; Maineri, M.; Zanantoni, C.

    1976-12-01

    The role of the load-duration curve in determining the installation policy for an electric power system, is examined. The effect of the priority order for the allocation of the power stations in the load-diagram is also discussed: in the model used here (program TOTEM) this priority is given as a function of type and age of the station. The significance of the load factor history for a power station as a function of its age is also discussed. It is suggested that such a curve be deduced as a result of strategy calculations made with TOTEM rather than assumping it as input data

  9. FY 1998 report on the results of the New Sunshine Project - Development of the commercialization technology of the photovoltaic power system. Verification study of the photovoltaic power system - Research on engineering methods for cost effective PV installation; 1998 nendo taiyoko hatsuden system jitsuyoka gijutsu kaihatsu seika hokokusho. Taiyoko hatsuden system no jissho kenkyu (tashu secchi koho no kenkyu kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the purpose of promoting installations of PV system and making use of the unused space for which a rise in the PV demand equal to that in houses, building roofs, etc. is expected, examination/research for much newer forms of land installation are proceeded with, and evaluation/verification of reliability/durability are conducted of new installation processes using thin film solar cells, adhesives, etc. In this fiscal year, study of the development/verification of low cost floating pedestal was promoted, and at the same time, examinational study of forms of land installation was made. As to the development of low cost floating pedestal, the module type flexible floating pedestal was developed as a small prototype pedestal and tested for installation in a pool. Survey was also carried out of geometry, mooring systems, materials, design conditions, and existing instances of different floats, and measures were studied for the effective use of the floating system. In relation to reliability and durability evaluation of the new installation process, the verification operation of evaluation facilities for various installation processes was continued, and the power generation capacity was made clear in special forms of installation such as installations on vertical/horizontal surfaces. And the study was made of the large area frameless structure, building use double glass structure, and durability of the adhesive/adhesive tape process of thin film solar cells. (NEDO)

  10. Research center Juelich to install Germany's most powerful supercomputer new IBM System for science and research will achieve 5.8 trillion computations per second

    CERN Multimedia

    2002-01-01

    "The Research Center Juelich, Germany, and IBM today announced that they have signed a contract for the delivery and installation of a new IBM supercomputer at the Central Institute for Applied Mathematics" (1/2 page).

  11. The LECA installation - INB 55. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Leca base nuclear installation located in Cadarache (description, activities, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, reference earthquake and installation compliance, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions, earthquake exceeding the design level) and loss of external or internal electric supplies. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions and practices

  12. Degradation of TBC Systems in Environments Relevant to Advanced Gas Turbines for IGCC Systems

    Science.gov (United States)

    Bohna, Nathaniel Allan

    Plasma sprayed (PS) thermal barrier coatings (TBCs) are used to provide thermal insulation for the hottest components in gas turbines. Zirconia stabilized with 7wt% yttria (7YSZ) is the most common ceramic top coat used for turbine blades. The 7YSZ coating can be degraded by the buildup of fly-ash deposits which can arise from the fuel source (coal/biomass) used in the combustion process in gas turbines. Fly-ash from the integrated gasification combined cycle (IGCC) process can result from coal-based syngas and also from ambient air which passes through the system. TBCs are also exposed to harsh gas environments containing CO2, SO2, and steam. As presented in this thesis, degradation from the combined effects of fly-ash and harsh gas atmosphere can severely limit TBC lifetimes. It is well established that degradation at very high temperatures (≥1250°C) from deposits consisting of the oxides CaO-MgO-Al2O3-SiO 2 results from extensive liquid silicate infiltration into the porous top coat of the YSZ. This infiltration causes early failure resulting from chemical and/or mechanical damage to the ceramic layer. Damage resulting from liquid infiltration, however, is not typically considered at relatively lower temperatures around 1100°C because liquid silicates would not be expected to form from the oxides in the deposit. A key focus of this study is to assess the mode and extent of TBC degradation at 1100°C in cases when some amount of liquid forms owing to the presence of K2SO4 as a minor ash constituent. Two types of liquid infiltrations are observed depending on the principal oxide (i.e., CaO or SiO2) in the deposit. The degradation is primarily the result of mechanical damage, which results from infiltration caused by the interaction of liquid K2SO4 with either the CaO or SiO2. The TBCs used in this work are representative of commonly used coatings used in the hottest sections of land-based gas turbines. The specimens consist of 7YSZ top coats deposited on

  13. Southeast Asia - air pollution control and coal-fired power generation

    Energy Technology Data Exchange (ETDEWEB)

    Soud, H.N.

    1997-12-01

    Coal-fired power generation in Southeast Asia continues to grow in order to satisfy the increasing demand for electricity throughout the region. Emissions standards have been adopted in some Southeast Asian countries. Particulate matter, SO{sub 2} and NO{sub x} emissions are the main air pollutants for which standards have been introduced. Coal cleaning, and upgrading are not used much currently. Blending is used in Thailand and is being investigated in Indonesia. Pulverised coal combustion continues to dominate the coal-fired generating capacity. FBC is used at smaller scale and in a few cases. PFBC and IGCC are considered only as options for the future. Control priority is given to particulate matter and ESPs are installed on most (existing and new) coal-fired plants. Although FGD has been installed at Mae Moh in Thailand and is planned for Paiton in Indonesia and Sual in the Philippines, the technology is still considered expensive and its application is likely to remain limited. Boiler optimisation is the main NO{sub x} abatement method currently used. It is expected that low NO{sub x} burners will be used in the future especially in new plant. 166 refs., 1 fig., 40 tabs.

  14. Questionnaire regarding the international Freiberg conference on IGCC and XtL technologies. Analysis of 75 questionnaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The Puertollano IGCC Plant, owned by ELCOGAS, uses a mixture (50/50% weight) of local coal with high content of ash (approximately 45%) and pet-coke to be fed into its pressurised entrained flow gasifier. Ash is removed from the bottom of the gasifier as vitrified slag although a fraction is converted into fly ash (2.5-3 t/h) and entrained by the syngas. In order to remove this fly ash, it is filtered in two candle filter vessels with more than 1,000 candles each, using nitrogen for on-line cleaning. The filtering system suffers some malfunctions resulting in blinding of the internal candle surface and increasing of the candle DP. The model of candle filter was changed and modifications were performed without the desired results. Therefore, the identification of suitable hot gas filtration technologies capable of overcoming current and future severe operational constraints experienced is of the utmost importance for IGCC units. In this sense, a pilot plant which allows the performance of alternative filtering elements tests, pulse cleaning strategies, on-line particulate monitoring and off-cleaning procedures has come into operation at the ESI-University of Seville facilities. The design has been conceived as a versatile pilot unit, in order to hold both bags and ceramic candles which are to be tested in a wide range of operating conditions. The pilot is processing air laden with real fly ash provided by ELCOGAS, and high pressure nitrogen for the cleaning operation. This paper describes the design and operation of the pilot as well as the testing plan currently being carried out. (orig.)

  15. Pinon Pine power project nears start-up

    Energy Technology Data Exchange (ETDEWEB)

    Tatar, G.A. [Sierra Pacific Power Co., Reno, NV (United States); Gonzalez, M. [Foster Wheeler USA Corp., Clinton, NJ (United States); Mathur, G.K. [M.W. Kellogg Co., Houston, TX (United States)

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing of the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.

  16. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  17. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  18. The MCMF installation - INB 53. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the MCMF (fissile materials warehouse) base nuclear installation located in Cadarache (description, activities, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (reference earthquake, installation sizing and compliance, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions related to flooding like tempest, rainfalls and so on, earthquake exceeding the design level), and loss of external or internal electric supplies. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions, modalities and practices

  19. Wind power installations in Switzerland - Regional planning basics and impact; Eoliennes en Suisse. Bases de planification pour l'amenagement du territoire et effets. Rapport de base

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  20. The Pegase installation - INB 22. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Pegase base nuclear installation located in Cadarache (description and functions, radioactive and chemical materials, specific risks, present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing and compliance, margin assessment), external flooding (installation sizing and compliance, margin assessment in relationship with the different flooding origins), other extreme natural events (hail, extreme rainfalls, strong winds, lightning, and earthquake exceeding the design level), and loss of external or internal electric supplies. The next parts address severe accident management (means and organization for crisis management, robustness of available means), and subcontracting conditions and practices

  1. The Rapsodie installation - INB 25. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Rapsodie base nuclear installation located in Cadarache (brief description of buildings, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (reference earthquake, installation sizing and compliance issues, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions related to flooding, earthquake exceeding the design level), and loss of external or internal electric supplies and of cooling systems. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions, modalities and practices

  2. The CHICADE installation - INB 156. Additional safety assessment with respect to the accident which occurred in the Fukushima-Daiichi nuclear power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the Chicade base nuclear installation located in Cadarache (brief description, radioactive and chemical material inventory, specific risks, and present status), this document reports the identification of cliff-edge effect risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing and compliance, margin assessment for the different structures and equipment), external flooding (installation sizing, compliance, and margin assessment in relationship with the different flooding origins), other extreme natural events (extreme meteorological conditions related to flooding like tempest, rainfalls and so on, earthquake exceeding the design level), and loss of external or internal electric supplies. The next parts address severe accident management (risks related to the industrial environment, means and organization for crisis management, exercises and training, robustness of available means), and subcontracting conditions and practices

  3. Additional safety assessment of the ATALANTE installation (INB nr 148) with respect to the accident which occurred in the Fukushima-Daiichi power station

    International Nuclear Information System (INIS)

    2012-01-01

    After a presentation of some characteristics of the ATALANTE base nuclear installation (site, activities, buildings, laboratories, materials, status with respect to the additional safety assessment), this document reports the identification of cliff-edge risks and of critical structures and equipment. Then, it addresses the different risks: earthquake (installation sizing, margin assessment, earthquake-induced risks), flooding (different origins, alarm measures), other extreme natural events (lightning, rain falls, extreme earthquake with induced flooding), loss of electric supplies and of cooling systems (separately or combined). The next parts address the organization and means of intervention for severe accident management, and subcontracting practices

  4. Valuing flexibility: The case of an Integrated Gasification Combined Cycle power plant

    International Nuclear Information System (INIS)

    Abadie, Luis M.; Chamorro, Jose M.

    2008-01-01

    In this paper we analyze the choice between two technologies for producing electricity. In particular, the firm has to decide whether and when to invest either in a Natural Gas Combined Cycle (NGCC) power plant or in an Integrated Gasification Combined Cycle (IGCC) power plant, which may burn either coal or natural gas. Instead of assuming that fuel prices follow standard geometric Brownian motions, here they are assumed to show mean reversion, specifically to follow an inhomogeneous geometric Brownian motion. First we consider the opportunity to invest in a NGCC power plant. We derive the optimal investment rule as a function of natural gas price and the remaining life of the right to invest. In addition, the analytical solution for a perpetual option to invest is obtained. Then we turn to the IGCC power plant. We analyse the valuation of an operating plant when there are switching costs between modes of operation, and the choice of the best operation mode. This serves as an input to evaluate the option to invest in this plant. Finally we derive the value of an opportunity to invest either in a NGCC or IGCC power plant, i.e. to choose between an inflexible and a flexible technology, respectively. Depending on the opportunity's time to maturity, we derive the pairs of coal and gas prices for which it is optimal to invest in NGCC, in IGCC, or simply not to invest. Numerical computations involve the use of one- and two-dimensional binomial lattices that support a mean-reverting process for coal and gas prices. Basic parameter values are taken from an actual IGCC power plant currently in operation. Sensitivity of some results with respect to the underlying stochastic process for fuel price is also checked

  5. Owner of a solar craftsman's establishment installs solar thermal power system on his own roof; Bekenntnis auf eigenem Dach. Solarthermie

    Energy Technology Data Exchange (ETDEWEB)

    Mertel, B. [WESTFA Westfaelische Apparatebau- und Vertriebs GmbH, Hagen (Germany)

    2008-09-15

    Tourism and solar water heating go together well, says Hermann Bachmaier, who owns a solar craftsman's business as well as a bed and breakfast place. On this building, he installed a model solar system from which both of his businesses profit. (orig.)

  6. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  7. Power generation plants with carbon capture and storage: A techno-economic comparison between coal combustion and gasification technologies

    International Nuclear Information System (INIS)

    Tola, Vittorio; Pettinau, Alberto

    2014-01-01

    Highlights: • Techno-economic performance of coal-fired power plants (without and with CCS). • Without CCS system, USC is more efficient and cost-competitive than IGCC. • CCS energy penalties are more relevant for USC than IGCC. • Higher SNOX system costs are partially compensated by better USC performance. • CCS technologies cannot be profitable without adequate policies and incentives. - Abstract: Worldwide energy production requirements could not be fully satisfied by nuclear and renewables sources. Therefore a sustainable use of fossil fuels (coal in particular) will be required for several decades. In this scenario, carbon capture and storage (CCS) represents a key solution to control the global warming reducing carbon dioxide emissions. The integration between CCS technologies and power generation plants currently needs a demonstration at commercial scale to reduce both technological risks and high capital and operating cost. This paper compares, from the technical and economic points of view, the performance of three coal-fired power generation technologies: (i) ultra-supercritical (USC) plant equipped with a conventional flue gas treatment (CGT) process, (ii) USC plant equipped with SNOX technology for a combined removal of sulphur and nitrogen oxides and (iii) integrated gasification combined cycle (IGCC) plant based on a slurry-feed entrained-flow gasifier. Each technology was analysed in its configurations without and with CO 2 capture, referring to a commercial-scale of 1000 MW th . Technical assessment was carried out by using simulation models implemented through Aspen Plus and Gate-Cycle tools, whereas economic assessment was performed through a properly developed simulation model. USC equipped with CGT systems shows an overall efficiency (43.7%) comparable to IGCC (43.9%), whereas introduction of SNOX technology increases USC efficiency up to 44.8%. Being the CCS energy penalties significantly higher for USC (about 10.5% points vs. about 8

  8. Research and development of peripheral technology for photovoltaic power systems. Research on engineering methods for cost effective PV installation; Shuhen gijutsu no kenkyu kaihatsu. Tashu secchi koho no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Tatsuta, M [New Energy and Industrial Technology Development Organization, Tokyo (Japan)

    1994-12-01

    This paper reports the study results on R and D of engineering methods for photovoltaic power system installation in fiscal 1994. (1) On the survey on applicable fields, various application aspects, applicability, and problems on location and legal regulation were continuously studied for railway, river reservation, lake surface and public facility as promising locations after highway in the last fiscal year. The result pointed out relatively easy possibility of PV power generation of nearly 11,700MW except residence and building fields. (2) On installation technology of solar cell arrays, several models based on various installation conditions, construction methods and system configurations were studied, and various application aspects were proposed by combination of simple design conditions. (3) On test and evaluation of the structural design of array racks, wind tunnel experiments were conducted for structure wall, platform shed and highway sound insulation wall. (4) On basic design of various promising systems, the conceptual design of interconnection systems was carried out assuming applications to highway and railway. 7 figs., 3 tabs.

  9. Safety concerning the alteration in fuel material usage (new installation of the uranium enrichment pilot plant) at Ningyo Pass Mine of Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1978-01-01

    A report of the Committee on Examination of Nuclear Fuel Safety was presented to the Atomic Energy Commission of Japan, which is concerned with the safety in the alteration of fuel material usage (new installation of the uranium enrichment pilot plant) at the Ningyo Pass Mine. Its safety was confirmed. The alteration, i.e. installation of the uranium enrichment pilot plant, is as follows. Intended for the overall test of centrifugal uranium enrichment technology, the pilot plant includes a two-storied main building of about 9,000 m 2 floor space, containing centrifuges, UF 6 equipment, etc., a uranium storage of about 1,000 m 2 floor space, and a waste water treatment facility, two-storied with about 300 m 2 floor space. The contents of the examination are safety of the facilities, criticality control, radiation control, waste treatment, and effects of accidents on the surrounding environment. (Mori, K

  10. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  11. Reactor design and operation strategies for a large-scale packed-bed CLC power plant with coal syngas

    NARCIS (Netherlands)

    Spallina, V.; Chiesa, P.; Martelli, E; Gallucci, F.; Romano, M.C.; Lozza, G.; Sint Annaland, van M.

    2015-01-01

    This paper deals with the design and operation strategies of dynamically operated packed-bed reactors (PBRs) of a chemical looping combustion (CLC) system included in an integrated gasification combined cycle (IGCC) for electric power generation with low CO2 emission from coal. The CLC reactors,

  12. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  13. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  14. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  15. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  16. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  17. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  18. Analysis on the Operation Strategy of the 220kV External Transmission Channel for the Nujiang Power Grid after the Installation of Series Compensation

    Science.gov (United States)

    Liu, Xiaoxin; Feng, Peilei; Jan, Lisheng; Dai, Xiaozhong; Cai, Pengcheng

    2018-01-01

    In recent years, Nujiang Prefecture vigorously develop hydropower, the grid structure in the northwest of Yunnan Province is not perfect, which leads to the research and construction of the power grid lags behind the development of the hydropower. In 2015, the company in view of the nu river hydropower dilemma decided to change outside the nu river to send out a passage with series compensation device in order to improve the transmission capacity, the company to the main problems related to the system plan, but not too much in the region distribution network and detailed study. Nujiang power grid has unique structure and properties of the nujiang power grid after respectively, a whole rack respectively into two parts, namely power delivery channels, load power supply, the whole grid occurred fundamental changes, the original strategy of power network is not applicable, especially noteworthy is the main failure after network of independent operation problem, how to avoid the local series, emergency problem is more urgent, very tolerance test area power grid, this paper aims at the analysis of existing data, simulation, provide a reference for respectively after the operation for the stable operation of the power grid.

  19. Future carbon regulations and current investments in alternative coal-fired power plant technologies

    International Nuclear Information System (INIS)

    Sekar, Ram C.; Parsons, John E.; Herzog, Howard J.; Jacoby, Henry D.

    2007-01-01

    We analyze how uncertain future US carbon regulations shape the current choice of the type of power plant to build. Our focus is on two coal-fired technologies, pulverized coal (PC) and integrated coal gasification combined cycle technology (IGCC). The PC technology is cheapest-assuming there is no need to control carbon emissions. The IGCC technology may be cheaper if carbon must be captured. Since power plants last many years and future regulations are uncertain, a US electric utility faces a standard decision under uncertainty. A company will confront the range of possible outcomes, assigning its best estimate of the probability of each scenario, averaging the results and determining the power plant technology with the lowest possible cost inclusive of expected future carbon related costs, whether those costs be in the form of emissions charges paid or capital expenditures for retrofitting to capture carbon. If the company assigns high probability to no regulation or to less stringent regulation of carbon, then it makes sense for it to build the PC plant. But if it assigns sufficient probability to scenarios with more stringent regulation, then the IGCC technology is warranted. We provide some useful benchmarks for possible future regulation and show how these relate back to the relative costs of the two technologies and the optimal technology choice. Few of the policy proposals widely referenced in the public discussion warrant the choice of the IGCC technology. Instead, the PC technology remains the least costly. However, recent carbon prices in the European Emissions Trading System are higher than these benchmarks. If it is any guide to possible future penalties for emissions in the US, then current investment in the IGCC technology is warranted. Of course, other factors need to be factored into the decision as well

  20. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  1. Order of the 23 March 2006 relative to the return rate on the immobilized capital for the electric power production installation in non connected areas

    International Nuclear Information System (INIS)

    2006-04-01

    This order fixes the return rate on the investments capital of electric power production in non connected areas, used for the calculation of the compensation expenses of the electric utilities. (A.L.B.)

  2. Experience with a servo-hydraulic mechanical testing machine installed in a new shielded active facility at Windscale Nuclear Power Development Laboratories

    International Nuclear Information System (INIS)

    Garlick, A.; Hindmarch, P.; Gravenor, J.G.; Rhodes, D.

    1982-03-01

    An Instron model 1273 servo-hydraulic machine has been installed within a lead-shielded cell at Windscale in order to provide a facility capable of performing a wide range of mechanical tests on nuclear reactor structural materials and fuel assembly components. This particular type of machine was chosen because it has design features associated with the load frame, location of the actuator and adjustment and clamping of the cross-head that are especially well suited to remote operation within a shielded cell. The design of the testing facility is described and the programmes of work that have been completed over the past 11/2 years of operation are reviewed. (author)

  3. Safety in connection with the request for approval of the installation alteration in the fuel reprocessing facilities of Power Reactor and Nuclear Fuel Development Corporation (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report to the Prime Minister by the Nuclear Safety Commission was presented concerning the safety in the installation alteration of the fuel reprocessing facilities, as PNC had requested its approval to the Prime Minister. The safety was confirmed. The items of examination on the safety made by the committee on Examination of Nuclear Fuel Safety of NSC were the aseismic design of liquid waste storage, uranium denitration facility, intermediate gate and radioactive solid waste storage; the criticality safety design of the denitration facility; the radiation shielding design of the liquid waste storage, denitration facility and solid waste storage; the function of radioactive material containment of the liquid waste storage and denitration facility; the radiation control in the liquid waste storage, denitration facility and solid waste storage; the waste management in the liquid waste storage and denitration facility; fire and explosion prevention in the liquid waste storage; exposure dose from the liquid waste storage and denitration facility. (Mori, K.)

  4. Seismic evaluation of nuclear installations

    International Nuclear Information System (INIS)

    Mattar Neto, Miguel

    1997-01-01

    Some considerations regarding extreme external events, natural or man-induce, such as earthquakes, floods, air crashes, etc, shall be done for nuclear facilities to minimizing the potential impact of the installation on the public and the environment. In this paper the main aspects of the seismic evaluation of nuclear facilities (except the nuclear power reactors) will be presented based on different codes and standards. (author). 7 refs., 2 tabs

  5. Vaye-Planaz drinking-water hydro-power installation; Petite centrale hydro-electrique de Vaye-Planaz sur le reseau d'eau potable de la commune de Grone. Etude de faisabilite. Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the concept for a hydro-power installation that uses an existing drinking-water supply system. The report takes a look at the present situation which features ground-water sources, a transport pipeline and two reservoirs. The concept for the use of the available water pressure due to height-difference to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  6. Icogne irrigation-network hydro-power installation; Petite centrale hydro-electrique sur le reseau d'irrigation de la commune d'Icogne. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Cordonier, N.; Rey, G. [Nicolas Cordonier et Gilles Rey SA, Sierre (Switzerland)

    2007-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the feasibility study for a hydro-power installation that uses an existing municipal irrigation scheme in the alpine region of Icogne, Switzerland. The report takes a look at the present situation which features, apart from the irrigation scheme itself, mountain torrents and artificial compensation lakes. The concept for the use of the available water pressure due to height-difference between these two lakes to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  7. INTEGRATED PYROLYSIS COMBINED CYCLE BIOMASS POWER SYSTEM CONCEPT DEFINITION

    International Nuclear Information System (INIS)

    Sandvig, Eric; Walling, Gary; Brown, Robert C.; Pletka, Ryan; Radlein, Desmond; Johnson, Warren

    2003-01-01

    Advanced power systems based on integrated gasification/combined cycles (IGCC) are often presented as a solution to the present shortcomings of biomass as fuel. Although IGCC has been technically demonstrated at full scale, it has not been adopted for commercial power generation. Part of the reason for this situation is the continuing low price for coal. However, another significant barrier to IGCC is the high level of integration of this technology: the gas output from the gasifier must be perfectly matched to the energy demand of the gas turbine cycle. We are developing an alternative to IGCC for biomass power: the integrated (fast) pyrolysis/ combined cycle (IPCC). In this system solid biomass is converted into liquid rather than gaseous fuel. This liquid fuel, called bio-oil, is a mixture of oxygenated organic compounds and water that serves as fuel for a gas turbine topping cycle. Waste heat from the gas turbine provides thermal energy to the steam turbine bottoming cycle. Advantages of the biomass-fueled IPCC system include: combined cycle efficiency exceeding 37 percent efficiency for a system as small as 7.6 MW e ; absence of high pressure thermal reactors; decoupling of fuel processing and power generation; and opportunities for recovering value-added products from the bio-oil. This report provides a technical overview of the system including pyrolyzer design, fuel clean-up strategies, pyrolysate condenser design, opportunities for recovering pyrolysis byproducts, gas turbine cycle design, and Rankine steam cycle. The report also reviews the potential biomass fuel supply in Iowa, provide and economic analysis, and present a summery of benefits from the proposed system

  8. INTEGRATED PYROLYSIS COMBINED CYCLE BIOMASS POWER SYSTEM CONCEPT DEFINITION

    Energy Technology Data Exchange (ETDEWEB)

    Eric Sandvig; Gary Walling; Robert C. Brown; Ryan Pletka; Desmond Radlein; Warren Johnson

    2003-03-01

    Advanced power systems based on integrated gasification/combined cycles (IGCC) are often presented as a solution to the present shortcomings of biomass as fuel. Although IGCC has been technically demonstrated at full scale, it has not been adopted for commercial power generation. Part of the reason for this situation is the continuing low price for coal. However, another significant barrier to IGCC is the high level of integration of this technology: the gas output from the gasifier must be perfectly matched to the energy demand of the gas turbine cycle. We are developing an alternative to IGCC for biomass power: the integrated (fast) pyrolysis/ combined cycle (IPCC). In this system solid biomass is converted into liquid rather than gaseous fuel. This liquid fuel, called bio-oil, is a mixture of oxygenated organic compounds and water that serves as fuel for a gas turbine topping cycle. Waste heat from the gas turbine provides thermal energy to the steam turbine bottoming cycle. Advantages of the biomass-fueled IPCC system include: combined cycle efficiency exceeding 37 percent efficiency for a system as small as 7.6 MW{sub e}; absence of high pressure thermal reactors; decoupling of fuel processing and power generation; and opportunities for recovering value-added products from the bio-oil. This report provides a technical overview of the system including pyrolyzer design, fuel clean-up strategies, pyrolysate condenser design, opportunities for recovering pyrolysis byproducts, gas turbine cycle design, and Rankine steam cycle. The report also reviews the potential biomass fuel supply in Iowa, provide and economic analysis, and present a summery of benefits from the proposed system.

  9. Software for optimal selection of places for installation of balancing devices in 0,4 kV electric power systems loaded with electric motors

    Directory of Open Access Journals (Sweden)

    Romanova Victoria

    2017-01-01

    Full Text Available This publication considers the issues of development of the software program for designing of 0,4 kV power supply systems with motor-actuated load under voltage unsymmetry conditions (using the example of the Trans-Baikal Territory. Voltage unsymmetry is practically constant phenomenon in the electric power networks of different voltage types. Voltage unsymmetry effects significantly the electric power consumers, including the supply mains itself. It has especially negative impact on the electrical equipment operation process and its lifetime. The urgency of the problem is confirmed by multiple research on the same topic and by significant number of damages suffered by the electric power consumers staying in service (especially in the Trans-Baikal Territory and in the Far-East regions. Voltage unsymmetry causes economic loss and reduction of the electromagnetic interference value by the voltage unsymmetry coefficient in negative-phase sequence (K2U gives inevitable economic effect accordingly. However, the payback period for the activities aimed at reduction of electromagnetic interference, will vary from some months to several years. The more accurate value of the payback period may be obtained using the developed software program. The developed software design program is implemented by means of the programming language C# in Microsoft Visual Studio environment, using the built-in cross-platform database SQLite. The software program shall allow making quick and accurate calculation of the power losses, to determine the economic feasibility of provision special measures for removal of the voltage unsymmetry, for determination of optimal application and location of the balancing devices. The software implementation in power systems loaded with electric motors will improve reliability and efficiency of asynchronous motors. The software is of interest for developers of projects on power supply systems for regions with non-linear loads.

  10. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  11. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  12. CO2 reduction potential of future coal gasification based power generation technologies

    International Nuclear Information System (INIS)

    Jansen, D.; Oudhuis, A.B.J.; Van Veen, H.M.

    1992-03-01

    Assessment studies are carried out on coal gasification power plants integrated with gas turbines (IGCC) or molten carbonate fuel cells (MCFC) without and with CO 2 -removal. System elements include coal gasification, high-temperature gas-cleaning, molten carbonate fuel cells or gas turbines, CO shift, membrane separation, CO 2 recovery and a bottoming cycle. Various system configurations are evaluated on the basis of thermodynamic computations. The energy balances of the various system configurations clearly indicate that integrated coal gasification MCFC power plants (IGMCFC) with CO 2 removal have high efficiencies (42-47% LHV) compared to IGCC power plants with CO 2 -removal (33-38% LHV) and that the CO 2 -removal is simplified due to the specific properties of the molten carbonate fuel cells. IGMCFC is therefore an option with future prospective in the light of clean coal technologies for power generation with high energy efficiencies and low emissions. 2 figs., 3 tabs., 10 refs

  13. Modeling and simulation of syngas purification and power generation in integrated gasification combined cycle (IGCS)

    Energy Technology Data Exchange (ETDEWEB)

    Mehmood, N; Zaman, Z U; Mehran, M T [National Development, Islamabad (Pakistan)

    2011-07-01

    Integrated Gasification Combined Cycle (IGCC) is one of the most promising technologies for power generation; The environmental benefits and the higher energy conversion efficiency distinguish it from traditional coal generation technologies. This work presents a structured and validated conceptual model of purification of coal gas produced during the Underground Coal Gasification (UCG) of coal containing high sulfur contents. Gas cleaning operations for CO/sub 2/, H/sub 2/S and moisture removal have been modeled in steady and dynamic state. The power generation from combined cycle is also modeled. The model has been developed using Aspen HYSYS and Aspen Plus simulation software. Predicted results of clean gas composition and generated power present a good agreement with industrial data and efficiency parameters. This study is aimed at obtaining optimal assessment of an integrated gasification combined cycle (IGCC) power plant configurations. (author)

  14. Modeling and simulation of syngas purification and power generation in integrated gasification combined cycle (IGCS)

    International Nuclear Information System (INIS)

    Mehmood, N.; Zaman, Z.U.; Mehran, M.T.

    2011-01-01

    Integrated Gasification Combined Cycle (IGCC) is one of the most promising technologies for power generation; The environmental benefits and the higher energy conversion efficiency distinguish it from traditional coal generation technologies. This work presents a structured and validated conceptual model of purification of coal gas produced during the Underground Coal Gasification (UCG) of coal containing high sulfur contents. Gas cleaning operations for CO/sub 2/, H/sub 2/S and moisture removal have been modeled in steady and dynamic state. The power generation from combined cycle is also modeled. The model has been developed using Aspen HYSYS and Aspen Plus simulation software. Predicted results of clean gas composition and generated power present a good agreement with industrial data and efficiency parameters. This study is aimed at obtaining optimal assessment of an integrated gasification combined cycle (IGCC) power plant configurations. (author)

  15. Performance analysis of a gas turbine for power generation using syngas as a fuel

    International Nuclear Information System (INIS)

    Lee, Jong Jun; Cha Kyu Sang; Kim, Tong Seop; Sohn, Jeong Lak; Joo, Yong Jin

    2008-01-01

    Integrated Gasification Combined Cycle (IGCC) power plant converts coal to syngas, which is mainly composed of hydrogen and carbon monoxide, by the gasification process and produces electric power by the gas and steam turbine combined cycle power plant. The purpose of this study is to investigate the influence of using syngas in a gas turbine, originally designed for natural gas fuel, on its performance. A commercial gas turbine is selected and variations of its performance characteristics due to adopting syngas is analyzed by simulating off-design gas turbine operation. Since the heating value of the syngas is lower, compared to natural gas, IGCC plants require much larger fuel flow rate. This increase the gas flow rate to the turbine and the pressure ratio, leading to far larger power output and higher thermal efficiency. Examination of using two different syngases reveals that the gas turbine performance varies much with the fuel composition

  16. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  17. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  18. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  19. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  20. Decree of the 23 May 2016 related to installations of heat and/or electric power production from non-hazardous wastes prepared under the form of recovery solid fuels in installations designed for this purpose and associated or not with another fuel covered by section 2971 of the nomenclature of installations classified for the protection of the environment. Decree of the 23 May 2016 related to the preparation of recovery solid fuels in view of their use in installations covered by section 2971 of the nomenclature of installations classified for the protection of the environment

    International Nuclear Information System (INIS)

    Mortureux, M.

    2016-01-01

    A first decree presents the various prescriptions regulating installations used for the co-combustion of recovery solid fuels for the production of heat and/or electricity: definition and scope of application, design and general arrangement of installations, conditions for fuel admission and delivery, conditions of exploitation, risk prevention, air pollution prevention, water pollution prevention, management and processing of residues, release monitoring and impact on the environment, information on installation operation or stoppage. Appendices provide limit values for atmospheric releases, equivalence factors for dibenzo-para-dioxines and dibenzofuranes, limit values for liquid effluents. The second decree addresses the regulation of the preparation and production of recovery solid fuels

  1. Increase in the number of distributed power generation installations in electricity distribution grids - General requirements; Zunahme der dezentralen Energieerzeugungsanlagen in elektrischen Verteilnetzen: Rahmenbedingungen

    Energy Technology Data Exchange (ETDEWEB)

    Schnyder, G.; Mauchle, P.

    2003-07-01

    This is the third part of a ten-part final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. The first part of this second appendix to the main report examines the electrical conditions and requirements that have to be met by distributed production facilities. These include limits for voltage and frequency, synchronisation aspects, protection, reactive power questions and islanding. Also, recommendations are made on the assessment of grid reactions and on the avoidance of non-permissible effects on the grid's audio-frequency remote control apparatus. A second part examines the situation concerning the connection of distributed power units to the grid and grid topologies. The last chapter lists relevant standards and guidelines.

  2. Optimization of the operational parameters in isotopic exchange installations. ROMAG PROD plant production of heavy water for the nuclear power plant

    International Nuclear Information System (INIS)

    Pop, A.

    2002-01-01

    The ROMAG PROD heavy water plant at Drobeta Turnu Severin together with SN Nuclearelectrica Company and Nuclear Fuel Plant at Pitesti are the most important pillars the National Nuclear Program is based on. The plant became operational on 17th July 1988, was later modernized and now reached in the field a leading position known world wide. There are described the modifications adopted to the two stages of the isotopic exchange installation besides some refurbishment measures of general character. The increase of discharge flow rate in cool columns vs hot columns resulted in a rise of technological regime stability and the feeding rate. Also in the first stage the stripping vapor injection in the hot columns was modified to avoid vacuum excursion in the columns. In the second stage two isotopic exchange trays were replaced with dry trays to obtain drop separation at the cool column top. All the trays from the isotopic exchange section of the cool column were replaced by trays from the hot column. The thermal exchange zone in the cool column was modified by introducing trays with number of holes. The gas flow rate of the stage two compressor was adapted to the design requirements. By these changes of the parameters in the original design were substantially improved, the operation became easier, more secure and safer for the environment while the production of the heavy water doubled between 1995 and 2001 reaching a value of 163 t/y in 2001

  3. Geological Mapping and Identification of Active Fault in Site Candidate of Nuclear Power Plant Installation at Ketapang Area and Its Surroundings, Madura

    International Nuclear Information System (INIS)

    Ngadenin; Lilik-Subiantoro; Kurnia-Setiawan-W; Agus-Sutriyono; P Widito

    2004-01-01

    The result of economical study about demand of electric and water supply in Madura Island in 2015 will increase double for domestic or support industry in Madura Island which have to be solved sooner. One way which is considered to solve the problem is Desalination with nuclear electrical plant. In order to support the installation of nuclear Desalination plant, it is needed site free or far from active fault. Active fault is mainly factor to reject the area on site selection process. Aim of the research is to get geological information and identify of active fault in the site candidate of nuclear Desalination plant at Ketapang area and its surrounding by interpretation of air photos and Landsat imagery, geological and structure geological mapping as well as trenching. The lithology of Ketapang and Sokobana site candidate consists of reef and chalky limestone with form of morphology is undulating hills. Structurally, research areas forms a mono cline with east-westerly trending axis, plunging 10 o to E, the direction of strike is W-E, dip 10 o -30 o to the north. This research concludes that an active fault was not found in the area. (author)

  4. Independent technical support for the frozen soil barrier installation and operation at the Fukushima Daiichi Nuclear Power Station (F1 Site)

    Energy Technology Data Exchange (ETDEWEB)

    Looney, Brian B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jackson, Dennis G. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-23

    TEPCO is implementing a number of water countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of protection. In general, the strategy represents a comprehensive example of a “defense in depth” concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area and provide TEPCO the ability to reduce the amount of contaminated water that requires treatment and storage. The National Laboratory team supports the selection of artificial ground freezing and the incorporation of the frozen soil barrier in the contaminated water countermeasures -- the technical characteristics of a frozen barrier are relatively well suited to the Fukushima-specific conditions and the need for inflow reduction. Further, our independent review generally supports the TEPCO/Kajima design, installation strategy and operation plan.

  5. Translating sexual assault prevention from a college campus to a United States military installation: piloting the know-your-power bystander social marketing campaign.

    Science.gov (United States)

    Potter, Sharyn J; Stapleton, Jane G

    2012-05-01

    One population that shares both similar and different characteristics with traditional college-age students is the U.S. Military. Similarities include a high concentration of 18- to 26-year-olds dealing with new found independence, peer pressure, and the presence of social norms that support violence and hypermasculinity. Sexual violence is a major public health problem in the United States, and because of the similarities in the age group of college and military populations, the problems regarding sexual violence in both constituencies have been well-documented. In the current pilot study we seek to add to both current knowledge about and promising practices of translating prevention strategies from one target audience to another. We describe how we translated, administered, and evaluated a bystander intervention social marketing campaign focused on sexual assault prevention that had been found to significantly affect attitude change on a college campus for a U.S. Army installation in Europe. In addition to demonstrating the process of translating prevention strategies across target audiences, findings from this pilot study contribute to the evaluation data on the effectiveness of sexual violence prevention strategies implemented with members of the U.S. Military. From our analysis, we see that research participants indicate that the degree to which the images resonate with them and the familiarity of the context (i.e., social self-identification) significantly effect the participants' personal responsibility for reducing sexual assault, confidence in acting as a bystander, and reported engagement as a bystander.

  6. Increase in the number of distributed power generation installations in electricity distribution grids - Literature; Zunahme der dezentralen Energieerzeugungsanlagen in elektrischen Verteilnetzen: Literatur

    Energy Technology Data Exchange (ETDEWEB)

    Gottsponer, O.; Mauchle, P.

    2003-07-01

    This is the tenth and last part of a final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This ninth appendix to the main report presents an overview and details of the literature and internet sources used in the project. Also, similar projects that discuss the problem area dealt with are briefly described. These include the Dispower, EDIson, DEMS, AMOEVES and ELSAD projects.

  7. Choice of optimum size of installations for dual-purpose production of desalted water and electricity, using nuclear power; Le dimensionnement optimum des installations de production mixte d'eau sessalee et d'electricite faisant intervenir l'energie nucleaire

    Energy Technology Data Exchange (ETDEWEB)

    Gaussens, J [Commissariat a l' Energie Atomique, Paris (France)

    1966-07-01

    The author used a method starting with water and power demand curves; this leads to the rational allocation of production costs to water and power within a given market. The power demand curve is needed as it seems improbable to sell at a constant price the enormous quantity of electricity produced by a dual purpose plant. Criteria based on principles of classical economics, help to select objectively desalination methods and plant sizes. On these criteria, normative methods for tariffing action of water and power can be based, while adhering as closely as possible to structure of demand. Examples of such criteria are the maximum profit of the supplier or the maximum satisfaction of the consumers taken collectively. In the first case marginal costs must be equated to marginal revenue, in the second one marginal cost to marginal satisfaction (theory of surpluses). The plant size often determines the choice of desalination process. Therefore the shape of the water demand curve and the economic criterion adopted (public or private ownership, capital restrictions etc.) often determine in this way both size and type of plant. Before deciding on the desalination technique, market surveys and rather subtle economic analyses are therefore necessary. (author) [French] Le probleme est presente en introduisant la notion de courbes de demande d'eau et d'electricite, ce qui permet d'aboutir a un partage rationnel des couts de revient entre eau et electricite dans ]e cadre d'un marche. L'objet de l'etude est, a partir des principes de l'economie classique, de donner des criteres objectifs de selection des dimensions des installations et des techniques de dessalement et d'en deduire une methode normative de tarification des deux produits lies: eau et electricite, en collant autant que possible a la structure de la demande. Ces criteres sont en particulier, soit le maximum de benefice de l'exploitant, soit le maximum de satisfaction des utilisateurs, c'est-a-dire la realisation d

  8. Advanced Micro Grid Energy Management Coupled with Integrated Volt/VAR Control for Improved Energy Efficiency, Energy Security, and Power Quality at DoD Installations

    Science.gov (United States)

    2016-10-28

    maintaining the data needed, and completing and reviewing this collection of information. Send comments regarding this burden estimate or any other...voltage adjustments was tedious and resulted in less than expected savings. The building level voltage control equipment was not financially viable...is defined as the ratio of percentage of power consumption reduction over the percentage in voltage reduction. %% (3) The effects of CVR

  9. Increase in the number of distributed power generation installations in electricity distribution grids - Storage technologies; Zunahme der dezentralen Energieerzeugungsanlagen in elektrischen Verteilnetzen: Grundlagen der Speicher

    Energy Technology Data Exchange (ETDEWEB)

    Luechinger, P.

    2003-07-01

    This is the fifth part of a ten-part final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This fourth appendix to the main report describes six ways of storing electricity, including accumulators, super caps, super-conducting magnetic and flywheel energy storage units. The accumulator technologies discussed include lead-acid, nickel-cadmium and sodium-sulphur batteries. Each of these types of power storage technologies is briefly described. The characteristics of these various types of storage are compared.

  10. Concerning modification of installation plan for reactor (modification of No.3 and No.4 reactor facilities) at Genkai nuclear power plant of Kyushu Electric Power Co., Ltd. (reply to inquiry)

    International Nuclear Information System (INIS)

    1988-01-01

    In response to an inquiry on the title issue, the Nuclear Safety Commission made an examination and submitted the findings to the Minister of International Trade and Industry. The modifications include the construction of combustion facilities for volume reduction of miscellaneous solid wastes. In the facilities, miscellaneous solid wastes will be combusted for volume reduction, and the combustion residue will be cooled with water and processed into glass-like granules, which will be stored in drums in the solid waste storage facilities. It is confirmed that the release of radioactive substances into the environment will be negligible, that the facilities have been designed to the Class B anti-earthquake standards, and that radiation monitors will be installed. The modifications also include the installation of an improved cement solidification system to replace a conventional-type system and a change in the capacity of the solid waste storage facilities. It is concluded that all proposed modifications should be approved. (Nogami, K.)

  11. Some suggestions based on the instrumentation installation experience at RAPP

    International Nuclear Information System (INIS)

    Raghunath, M.R.; Singh, S.; Jain, V.K.

    1977-01-01

    Suggestions regarding installation of reactor instrumentation have been made based on the instrumentation installation experience at the Rajasthan Atomic Power Plant. It has been mentioned that the instrumentation installation work has to proceed simultaneously with that of the heavy equipment and piping errection work, to meet the commissioning target dates. (S.K.K.)

  12. Reindeer and Wind Power - Study from the installation of two wind farms in Mala sameby; Renar och Vindkraft - Studie fraan anlaeggningen av tvaa vindkraftparker i Malaa sameby

    Energy Technology Data Exchange (ETDEWEB)

    Skarin, Anna; Nellemann, Christian; Sandstroem, Per; Roennegaard, Lars; Lundqvist, Henrik

    2013-05-15

    In the track of ever-expanding new infrastructure, such as wind power, roads and power lines, it becomes increasingly important to map and understand how free-ranging animals and wildlife respond. During the past decades, human - rangifer interactions have been assessed in over a hundred studies, with a strong bias on wild reindeer and caribou, although more recently also studies on domesticated reindeer in Norway, Finland, Sweden and Russia have been done with similar results. To clarify further the possible responses of domesticated reindeer to various disturbance sources, a review was made of over 15 existing disturbance studies of domesticated reindeer, we also discuss the effect of domestication on reindeer. The review shows the same pattern of avoidance in domesticated reindeer as for wild reindeer and caribou despite the domestication process. Sami reindeer husbandry today is an extensive form of pastoralism, which has led to a low degree of tameness among the reindeer. Domesticated reindeer can avoid infrastructure and human activity up to 12 km from the disturbance source and the avoided distance may shift between seasons and years and type of disturbance source, as well as diminish during periods of extreme starvation or insect harassment, similar to observation in wild reindeer and caribou. To get an overall picture of how the reindeer use their grazing land, it is therefore important to study large-scale and long-term habitat use of the reindeer whether they are domesticated or not. In this report, we want to share new information on how existing infrastructure such as roads and power lines in the landscape and construction phase of a new infrastructure for a wind farm affects the free roaming of the reindeer in a summer grazing area in a managed forest in northern Sweden.

  13. Mounting and performance measurements of a PV array addition to an existing small wind-power installation for greenhouse electric supply in Patagonia

    Directory of Open Access Journals (Sweden)

    Rafael Oliva

    2016-08-01

    Full Text Available A small wind-power system intended for electric supply of a research greenhouse at the local University facilities in San Julian region incorporates a photovoltaic (PV array and regulator, which is described in this report together with its data-acquisition system. The main application is control and lighting. The Alternative Energy Group at the University seeks through this project to acquire knowledge and practical experience in the combination of renewable energy sources for optimal electrical supply of isolated systems, their associated measurements and processing of resulting data

  14. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  15. Fiscal 2001 photovoltaic power generation field test project (Locations of systems installed in fiscal 1998-2000 at public facilities and industries); 2001 nendo taiyoko field test jigyo (Kokyo shisetsuyou sangyo tou you 1998 - 2000 nendo secchisha)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    The test was conducted for systems installed at General Health and Welfare Center, Munakata City, Fukuoka Prefecture; Comprehensive Traffic Center, Yamaguchi Prefecture; Primary schools, Sendai City, Miyagi Prefecture; Sakuragi Children's House, Shizuoka Prefecture; Midorigaoka Primary School, Hyogo Prefecture; Heath Center, Minamata City, Kumamoto Prefecture; Science Museum for Young People, Yamaguchi Prefecture; Wakatsuki Plastic Surgery Hospital, Niigata Prefecture; Hokuto Corporation, Aichi Prefecture; Industrial Research Institute, Ishikawa Prefecture; Shonan Institute of Technology, Kanagawa Prefecture; Gyosen Oil Co., Tokyo; Tamana Senior High School, Kumamoto Prefecture; Yukiyoshi Clinic, Niigata Prefecture; Saishoen Social Welfare Corporation; Akishimadai Kindergarten; Azabu Veterinarian School Group; Ueki-Kita Junior High School, Ueki Town; Garden of Longevity, Isen Town; Takamatsu Primary School, Takamatsu Town; Himeji Red Cross Hospital; and Kita-Daito Island Branch, Okinawa Electric Power Company, Inc. Mentioned in this report are the outlines of the photovoltaic power generation field test, the results of joint research, expected technical effect, enlightening effect, troubles involving power generation systems, and so forth. (NEDO)

  16. Model of purchase contract of the electric power produced by installations which eliminate the crude or transformed animal wastes, and subjected to the electric power purchase obligation. Established in the application of the article 5 from the decree of the 10 may 2001 and approved by the ministry charged with the electric power; Modele de contrat d'achat de l'energie electrique produite par les installations qui eliminent des dechets animaux bruts ou transformes, et beneficiant l'obligation d'achat d'electricite. Etablie en application de l'article 5 du decret du 10 mai 2001 et approuve par le Ministre charge de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The text of the contract is provided presenting the general conditions and specific conditions adapted to the installation characteristics of the electric power producer: contract object, connecting to the public network, producer installation, reciprocal agreements, measure and control of the energy and power, tariffs periods, price of the bought energy, taxes, payments, contract management, validity, suspension modification or avoidance of the contract. (A.L.B.)

  17. Model of purchase contract of the electric power produced by installations which use mainly the energy given by the combustion of non fossil matters of vegetable extraction, and subjected to the electric power purchase obligation. Established in the application of the article 5 from the decree of the 10 may 2001 and approved by the ministry charged with the electric power; Modele de contrat d'achat de l'energie electrique produite par les installations utilisant, a titre principal, l'energie degagee par la combustion de matieres non fossiles d'origine vegetale et beneficiant l'obligation d'achat d'electricite. Etablie en application de l'article 5 du decret du 10 mai 2001 et approuve par le Ministre charge de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The text of the contract is provided presenting the general conditions and specific conditions adapted to the installation characteristics of the electric power producer: contract object, connecting to the public network, producer installation, reciprocal agreements, measure and control of the energy and power, tariffs periods, price of the bought energy, taxes, payments, contract management, validity, suspension modification or avoidance of the contract. (A.L.B.)

  18. Model of purchase contract of the electric power produced by installations using the hydraulic energy of lakes, rivers and seas and subjected to the electric power purchase obligation. Established in the application of the article 5 from the decree of the 10 may 2001 and approved by the ministry charged with the electric power; Modele de contrat d'achat de l'energie electrique produite par les installations utilisant l'energie hydraulique des lacs, cours d'eau et mers et beneficiant l'obligation d'achat d'electricite. Etablie en application de l'article 5 du decret du 10 mai 2001 et approuve par le Ministre charge de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The text of the contract is provided presenting the general conditions and specific conditions adapted to the installation characteristics of the electric power producer: contract object, connecting to the public network, producer installation, reciprocal agreements, measure and control of the energy and power, tariffs periods, price of the bought energy, taxes, payments, contract management, validity, suspension modification or avoidance of the contract. (A.L.B.)

  19. Construction and operation of mining and power supply installations in the German Democratic Republic after the enactment of the State Treaty on May 18, 1990

    International Nuclear Information System (INIS)

    Palm, M.

    1990-01-01

    The paper deals with differences in substantial laws in the states to the treaty in individual fields of law, and their respective constitutional roots. The initial situation - status quo ante (mining and energy law in Germany until 1945 and in the GDR until 1989), changes in mining and energy law in the GDR under the State Treaty of 18.5.1990 (basics of the new law in the GDR since 1.7.1990, further law-making acts concerning the mining and power supply industry). The author gives an outlook on the future mining and energy law in the GDR after the accession pursuant to article 23 of the basic law, i.e. the adoption of federal regulations of administrative, procedural, mining and energy law, and on uncertainties remaining during the transitional phase. (RST) [de

  20. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  1. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  2. Aerodynamics and Heat Transfer Studies of Parameters Specific to the IGCC-Requirements: Endwall Contouring, Leading Edge and Blade Tip Ejection under Rotating Turbine Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Schobeiri, Meinhard; Han, Je-Chin

    2014-09-30

    This report deals with the specific aerodynamics and heat transfer problematic inherent to high pressure (HP) turbine sections of IGCC-gas turbines. Issues of primary relevance to a turbine stage operating in an IGCC-environment are: (1) decreasing the strength of the secondary flow vortices at the hub and tip regions to reduce (a), the secondary flow losses and (b), the potential for end wall deposition, erosion and corrosion due to secondary flow driven migration of gas flow particles to the hub and tip regions, (2) providing a robust film cooling technology at the hub and that sustains high cooling effectiveness less sensitive to deposition, (3) investigating the impact of blade tip geometry on film cooling effectiveness. The document includes numerical and experimental investigations of above issues. The experimental investigations were performed in the three-stage multi-purpose turbine research facility at the Turbomachinery Performance and Flow Research Laboratory (TPFL), Texas A&M University. For the numerical investigations a commercial Navier-Stokes solver was utilized.

  3. Detailed feasibility study of a small-hydro power plant in Zerni on the municipal drinking water supply; Etude detaillee de faisabilite pour l'installation d'une petite centrale sur l'adduction d'eau potable de Zerni - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Reul, B. [MHyLab, Montcherand (Switzerland); Perruchoud, A. [SierreEnergie SA, Sierre (Switzerland)

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the municipal drinking water supply of the city of Sierre, Switzerland. The installation is to be made at the site of a new reservoir in Zerni. The report presents details on the hydrological data and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the applicable water regulations. The electricity production expected is discussed, as is the economic viability of the project.

  4. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  5. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  6. High-power repetitively pulsed CO{sub 2} laser with mechanical Q-switching and its application to studies in aerodynamic installations

    Energy Technology Data Exchange (ETDEWEB)

    Malov, Aleksei N; Orishich, Anatolii M; Shulyat' ev, Viktor B [S.A. Khristianovich Institute of Theoretical and Applied Mechanics, Siberian Branch, Russian Academy of Sciences, Novosibirsk (Russian Federation)

    2011-11-30

    A new method for organising the repetitively pulsed regime of CO{sub 2} laser oscillation at the expense of a self-filtering resonator and two concave cylindrical mirrors with equal curvature in the intracavity modulator is considered. The studies of the energy and temporal characteristics of the laser radiation show that the constructed laser has high efficiency close to that of a cw laser. The mean and pulse power of 4.5 and 200 kW, respectively, are obtained. For a wide range of gas-dynamic characteristics the possibility of the optical breakdown in the supersonic wide-aperture air flow is demonstrated. The coefficient of absorption of laser radiation in optical breakdown plasma in a supersonic air flow is investigated and its value amounting to 60% is obtained. For the first time it is found that the threshold density of air, corresponding to the efficiency jump, is equal to 1.8 - 2 kg m{sup -3} and independent of the Mach number M = 1.7 - 3.7. (lasers)

  7. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  8. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  9. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  10. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  11. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  12. Keeping the Future Bright: Department of Defense (DOD) Sustainable Energy Strategy for Installations

    Science.gov (United States)

    2016-04-04

    still slightly more expensive to install than utility-scale PV, distributed solar installation costs decreased in half since 2008, and this power source...has been privately purchased and installed . However, utility companies are beginning to purchase and install solar panel systems on homes and...front installation and hardware costs. This new initiative accounted for more than 72 % of U.S. residential solar installations in 2Ol4. Over the past

  13. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  14. A COMPUTATIONAL WORKBENCH ENVIRONMENT FOR VIRTUAL POWER PLANT SIMULATION

    Energy Technology Data Exchange (ETDEWEB)

    Mike Bockelie; Dave Swensen; Martin Denison; Adel Sarofim; Connie Senior

    2004-12-22

    In this report is described the work effort to develop and demonstrate a software framework to support advanced process simulations to evaluate the performance of advanced power systems. Integrated into the framework are a broad range of models, analysis tools, and visualization methods that can be used for the plant evaluation. The framework provides a tightly integrated problem-solving environment, with plug-and-play functionality, and includes a hierarchy of models, ranging from fast running process models to detailed reacting CFD models. The framework places no inherent limitations on the type of physics that can be modeled, numerical techniques, or programming languages used to implement the equipment models, or the type or amount of data that can be exchanged between models. Tools are provided to analyze simulation results at multiple levels of detail, ranging from simple tabular outputs to advanced solution visualization methods. All models and tools communicate in a seamless manner. The framework can be coupled to other software frameworks that provide different modeling capabilities. Three software frameworks were developed during the course of the project. The first framework focused on simulating the performance of the DOE Low Emissions Boiler System Proof of Concept facility, an advanced pulverized-coal combustion-based power plant. The second framework targeted simulating the performance of an Integrated coal Gasification Combined Cycle - Fuel Cell Turbine (IGCC-FCT) plant configuration. The coal gasifier models included both CFD and process models for the commercially dominant systems. Interfacing models to the framework was performed using VES-Open, and tests were performed to demonstrate interfacing CAPE-Open compliant models to the framework. The IGCC-FCT framework was subsequently extended to support Virtual Engineering concepts in which plant configurations can be constructed and interrogated in a three-dimensional, user-centered, interactive

  15. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  16. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  17. EPA RE-Powering Mapper Completed Installations

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  18. Unit installation and testing of demonstration of electric power generation using biogas from sewage treatment; Instalacao e testes de uma unidade de demonstracao de geracao de energia eletrica a partir de biogas de tratamento de esgoto

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Suani Teixeira; Gonzalez Velazquez, Silvia Maria Stortini; Martins, Osvaldo Stella; Costa, David Freire da; Basaglia, Fernando [Centro Nacional de Referencia em Biomassa (CENBIO), Sao Paulo, SP (Brazil)], e-mail: suani@iee.usp.br, e-mail: sgvelaz@iee.usp.br, e-mail: omartins@iee.usp.br, e-mail: davidcosta@iee.usp.br, e-mail: basaglia@iee.usp.br; Bacic, Antonio Carlos K. [Companhia de Saneamento Basico do Estado de Sao Paulo (SABESP), SP (Brazil)], e-mail: acbacic@sabesp.com.br

    2004-07-01

    This article intend to discuss the electricity generation with 30 kW (ISO) micro turbines, using biogas generated by sewage treatment process at SABESP (Basic Sanitation Company of Sao Paulo State), located at Barueri, Brazil. This project, pioneer in Latin America, is being accomplished together with BUN - Biomass Users Network of Brazil (proponent), by CENBIO - Brazilian Reference Center on Biomass (executer), with patronage of FINEP / CT-ENERG (financial backer), by means of COVENAT No: 23.01.0653.00, regarding to ENERG-BIOG Project - 'Installation and Tests of an Electric Energy Generation Demonstration Unit from Biogas Sewage Treatment'. This plant operates with anaerobic digestion process, which has as mainly products biogas (composed mainly by methane) and sludge. Currently, part of the methane produced is burnt in a boiler used to increase digesters efficiency process. The rest of the methane is burnt in flare to reduce the impacts caused by gases emissions. An alternative to flare it is the biogas conversion into electricity through engines and micro turbines. Thus, this article presents the project results, related with the exploitation of sewer biogas for power generation, as well as bigger details about purification, compression and electricity generation systems (biogas micro turbine), used in the facility. (author)

  19. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, fabrication/installation work, etc. were made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. Construction work of a pilot plant of coal gasification power generation was at its peak in April 1990, and installation/piping work for each facility/equipment was carried out. In May, transportation/installation of gas turbine and generator were started. In June, installation of equipment of the 66kV special high voltage switching station was conducted, and the initial power receiving of 6.9kV was conducted. In August, inspection before use was made of the main piping of the gasifier equipment, gas refining equipment and gas turbine equipment. In December, trial unit operation of each equipment and interlock test were carried out. 'The integrated plant protection interlock test' was made from January 21 to February 21, 1991, and the favorable results were obtained. On February 28, a ceremony to celebrate the completion of all facilities of pilot plant was made. In March, drying of gasifier and initial firing by light oil were conducted, and all the work was completed on March 25. (NEDO)

  20. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, fabrication/installation work, etc. were made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. Construction work of a pilot plant of coal gasification power generation was at its peak in April 1990, and installation/piping work for each facility/equipment was carried out. In May, transportation/installation of gas turbine and generator were started. In June, installation of equipment of the 66kV special high voltage switching station was conducted, and the initial power receiving of 6.9kV was conducted. In August, inspection before use was made of the main piping of the gasifier equipment, gas refining equipment and gas turbine equipment. In December, trial unit operation of each equipment and interlock test were carried out. 'The integrated plant protection interlock test' was made from January 21 to February 21, 1991, and the favorable results were obtained. On February 28, a ceremony to celebrate the completion of all facilities of pilot plant was made. In March, drying of gasifier and initial firing by light oil were conducted, and all the work was completed on March 25. (NEDO)

  1. Wind power planning: assessing long-term costs and benefits

    International Nuclear Information System (INIS)

    Kennedy, Scott

    2005-01-01

    In the following paper, a new and straightforward technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic load duration curves to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. The model is applied to potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO 2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on CO 2 charges, and capital costs for wind turbines and IGCC plant is also discussed. The methodology is intended for use by energy planners in assessing the social benefit of future investments in wind power

  2. Prospects for advanced coal-fuelled fuel cell power plants

    International Nuclear Information System (INIS)

    Jansen, D.; Laag, P.C. van der; Oudhuis, A.B.J.; Ribberink, J.S.

    1994-01-01

    As part of ECN's in-house R and D programmes on clean energy conversion systems with high efficiencies and low emissions, system assessment studies have been carried out on coal gasification power plants integrated with high-temperature fuel cells (IGFC). The studies also included the potential to reduce CO 2 emissions, and to find possible ways for CO 2 extraction and sequestration. The development of this new type of clean coal technology for large-scale power generation is still far off. A significant market share is not envisaged before the year 2015. To assess the future market potential of coal-fuelled fuel cell power plants, the promise of this fuel cell technology was assessed against the performance and the development of current state-of-the-art large-scale power generation systems, namely the pulverized coal-fired power plants and the integrated coal gasification combined cycle (IGCC) power plants. With the anticipated progress in gas turbine and gas clean-up technology, coal-fuelled fuel cell power plants will have to face severe competition from advanced IGCC power plants, despite their higher efficiency. (orig.)

  3. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  4. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  5. Holding of the public hearing concerning the alteration in reactor installations (addition of Unit 3 and 4) in the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    1984-01-01

    The Nuclear Safety Commission held a public hearing concerning the addition of Unit 3 and 4 in Kyushu Electric's Genkai Nuclear Power Station in Karatsu City, Saga prefecture, on June 18th, 1984. The selected persons (and other attendants) expressed opinions etc. and personnel in the Ministry of International Trade and Industry answered them. Results of the public hearing are to be taken into conservation in NSC's safety examination. The following are described concerning the public hearing held: date and place, participants, hearing program, documents distributed, names of the persons expressing opinions etc. and the respective summary items of opinions etc. (Mori, K.)

  6. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  7. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  8. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  9. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  10. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  11. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  12. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  13. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2002 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2002. There are two installations mentioned in the statement: Dungeness B and Heysham 1. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  14. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  15. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  16. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  17. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  18. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  19. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  20. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  1. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  2. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  3. Power

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård; Fogsgaard, Morten

    2016-01-01

    and creativity suggests that when managers give people the opportunity to gain power and explicate that there is reason to be more creative, people will show a boost in creative behaviour. Moreover, this process works best in unstable power hierarchies, which implies that power is treated as a negotiable....... It is thus a central point that power is not necessarily something that breaks down and represses. On the contrary, an explicit focus on the dynamics of power in relation to creativity can be productive for the organisation. Our main focus is to elaborate the implications of this for practice and theory...

  4. Photoelectric installations in Tunisia

    Energy Technology Data Exchange (ETDEWEB)

    Darkazalli, G

    1983-01-01

    Four autonomous photoelectric power plants (FEU) have been in operation since February, 1983 in the village of Hamman Biadha. One of them based on a solar battery (SB) with a capacity of 29 kilowatts made of modules by the Solar Power Corporation (U.S.A.), has a storage battery (AB) with a capacity of 360 kilowatts per hour, and serves to supply alternating current, 220 volt voltage electric power to stores, a mill, a hospital, a school and streetlights near them and 22 houses. The solar battery is maintained in a maximal power mode which increases the energy production by 5 to 10 percent. As the charge of the storage battery is reduced below the assigned levels, the appropriate consumers are shut off. The daily energy productivity of the photoelectric power plant is 119 kilowatt hours per day in July and 65 kilowatt hours per day in December. A smaller variant of this photoelectric power plant with a capacity of 1.5 kilowatts provides electric power to a farm. The other two photoelectric power plants drive the irrigation systems for a greenhouse with an area of 10exp4 square meters and a fruit garden. The maximum productivity of each of them is 750 cubic meters per month with a delivery of 17 meters.

  5. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  6. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  7. Model Predictive Control of Integrated Gasification Combined Cycle Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    B. Wayne Bequette; Priyadarshi Mahapatra

    2010-08-31

    The primary project objectives were to understand how the process design of an integrated gasification combined cycle (IGCC) power plant affects the dynamic operability and controllability of the process. Steady-state and dynamic simulation models were developed to predict the process behavior during typical transients that occur in plant operation. Advanced control strategies were developed to improve the ability of the process to follow changes in the power load demand, and to improve performance during transitions between power levels. Another objective of the proposed work was to educate graduate and undergraduate students in the application of process systems and control to coal technology. Educational materials were developed for use in engineering courses to further broaden this exposure to many students. ASPENTECH software was used to perform steady-state and dynamic simulations of an IGCC power plant. Linear systems analysis techniques were used to assess the steady-state and dynamic operability of the power plant under various plant operating conditions. Model predictive control (MPC) strategies were developed to improve the dynamic operation of the power plants. MATLAB and SIMULINK software were used for systems analysis and control system design, and the SIMULINK functionality in ASPEN DYNAMICS was used to test the control strategies on the simulated process. Project funds were used to support a Ph.D. student to receive education and training in coal technology and the application of modeling and simulation techniques.

  8. Zumbro Hydroelectric Project: installation of third unit. Feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, James V.

    1979-03-01

    The feasibility of adding a third generating unit at an existing hydro power plant near Rochester, Minn. was examined considering the economic, technical, and environmental aspects. Installation of the unit, aiming at an Oct. 1983 completion date, is recommended. (LCL)

  9. Integrated gasification combined cycle and the capture of CO{sub 2}: a solution for the mitigation of the CO{sub 2} emissions of coal fired power plants at large scale in the short term?; O ciclo combinado com gaseificacao integrada e a captura de CO{sub 2}: uma solucao para mitigar as emissoes de CO{sub 2} em termeletricas a carvao em larga escala no curto prazo?

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, Bettina Susanne

    2010-03-15

    The power sector of many big economies still relies heavily on coal fired plants and emits huge amounts of carbon dioxide (CO{sub 2}). The Integrated Gasification Combined Cycle (IGCC) is an innovative technology which holds advantages over current conventional coal technologies, including higher efficiency, pathway to carbon capture and storage (CCS) and higher product and fuel flexibility. The most critical obstacles for commercialization of IGCC technology are higher costs, lower reliability, and little operating experiences. The present work aims to analyze the maturity and the costs of the IGCC technology, with and without CCS, in order to evaluate its potential to be introduced in the generation fleet at big scale in the short term and, hence, its potential to guarantee the possibility to use coal in the power sector without compromising the effort to reduce CO{sub 2} emissions. The focus of the analysis of the technical viability concentrates strongly on the gasification process, since it the most critical process for the operation of the plant. The cost analysis contains three steps: a revision of cost estimates in scientific literature, a revision of reported cost for actually planned projects and a cost simulation that aims to analyze the influences of assumptions regarding the additional technology risk of IGCC plants. (author)

  10. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  11. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  12. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  13. UK nuclear installations

    International Nuclear Information System (INIS)

    Gronow, W.S.

    Regulations and conditions for the commissioning of nuclear power plants in the UK, their siting, licence conditions, design safety assessment, inspection during construction and conditions for safety in operation are listed. (J.P.)

  14. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and the FY 1989 results were summarized. As to the gasifier equipment, fabrication of a considerable number of the main equipment was finished. And, the equipment was sent into the coal gasification power plant and the installation work was done. Concerning gas refining facilities, fabrication of most of the components of the dry desulfurization system was finished, and further, fabrication of part of the piping prefabrication, disk and part of the disk fitting instrument was finished. The partial equipment of the dry dust removal system was also fabricated. About gas turbine facilities, the drawings necessary for each of the equipment fabricated/installed in this fiscal year were made, and at the same time a part of the technical data prepared so far was reviewed according to the progress of design. As to safety environmental facilities, installation work was done of gas treatment furnace, gas cooling system, buffer tank, desulfurizing tower, etc. Besides, design/technical study were made of the total control system, equipment of the indoor switching station, etc. (NEDO)

  15. FY 1998 report on the results of the New Sunshine Project - Development of the commercialization technology of the photovoltaic power system. Verification study of the photovoltaic power system - Research on engineering methods for cost effective PV installation (Data book. Survey of examples of PV systems in the world); 1998 nendo taiyoko hatsuden system jitsuyoka gijutsu kaihatsu seika hokokusho. Taiyoko hatsuden system no jissho kenkyu (tashu secchi koho no kenkyu kaihatsu (bessatsu data shu sekai no taiyoko hatsuden system jirei chosa))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the purpose of promoting installations of PV system and making use of the unused space for which a rise in the PV demand equal to that in houses, building roofs, etc. is expected, examination/research for much newer forms of land installation are proceeded with, and evaluation/verification of reliability/durability are conducted of new installation processes using thin film solar cells, adhesives, etc. In this fiscal year, for the purpose of contributing to the study to be widely made on various installation processes, the actual survey was conducted of various applications of the system which are being planned and introduced in Japan and abroad. Emphasis was placed on making new forms of installation applicable to Japan clear. Concretely, in addition to the study of new examples, the following were conducted: renewal of existing details of the survey, and electronic filing of system block charts/pictures as a key to the information supply by electronic media such as CD-ROM. Also conducted was a study for translating the contents into English or writing them both in Japanese and English. Further, the database was made newer using these results of the most up-to-date survey, and at the same time, the results were indicated of the statistical analysis of the usage, system form, power generation scale and element equipment of various systems. (NEDO)

  16. An analysis of the investment risk related to the integration of a supercritical coal-fired combined heat and power plant with an absorption installation for CO2 separation

    International Nuclear Information System (INIS)

    Bartela, Łukasz; Skorek-Osikowska, Anna; Kotowicz, Janusz

    2015-01-01

    Highlights: • Two variants of a CHP plant – with and without integration with CCS were analyzed. • For the CHP plant main investment risk factors were identified. • For two variants risk analyses based on Monte Carlo method have been carried out. • For evaluation of the investment risk four indices were defined and calculated. - Abstract: For two variants of a supercritical coal-fired combined heat and power plant a thermodynamic, economic and risk analyses were carried out. The first variant consists of a unit working without realization of CO 2 capture process. The second one is the unit integrated with a chemical absorption CO 2 capture installation. In this variant the heat required for the desorption process is supplied with steam extracted from the steam turbine. The developed model of the CHP plant allowed to obtain main operation characteristics for annual change of load. For the two analyzed variants the characteristics of the amount of produced electricity (gross and net), generated heat and consumed chemical energy of fuel, as a function of the cogeneration unit operation time per year, were determined. In the next stage of calculations these characteristics were required to carry out the economic and risk analysis. Economic performances were evaluated in terms of the break-even price of electricity. The performed analysis proves that both investment projects will achieve the same economic effect, i.e. 85.26 €/MW h, if the price of emissions allowances reaches the value of 47.88 €/MgCO 2 . In this case, the potentially better variant of the system may be indicated based on the result of the risk analysis. In order to perform the risk analysis the main technical and economic risk factors concerning implementation of this technology were identified. The risk analysis was conducted with the use of Monte Carlo method. Based on the determined cumulative probability curves of obtaining specified values of the break-even price of electricity, it

  17. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2001-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2001 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2001. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  18. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  19. Offshore nuclear installations

    International Nuclear Information System (INIS)

    Albano, R.

    1976-01-01

    It is possible now to foresee the creation of nuclear power plants on floating or fixed islands although from the safety viewpoint, floating islands are preferable. The definition of the legal nature of artificial islands raises a first problem insofar as artificial islands are neither islands nor ships. Furthermore, their statute would differ according to whether they were sited in territorial seas or in the new 'economic zones'. This leads to consideration of the applicability of Italian maritime legislation to nuclear power plants on floating islands without setting aside that of international regulations on radioactive maritime pollution. (N.E.A.) [fr

  20. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Jungmann, A.

    1976-01-01

    A nuclear reactor metal pressure vessel is surrounded by a concrete wall forming an annular space around the vessel. Thermal insulation is in this space and surrounds the vessel, and a coolant-conductive layer is also in this space surrounding the thermal insulation, coolant forced through this layer reducing the thermal stress on the concrete wall. The coolant-conductive layer is formed by concrete blocks laid together and having coolant passages, these blocks being small enough individually to permit them to be cast from concrete at the reactor installation, the thermal insulation being formed by much larger sheet-metal clad concrete segments. Mortar is injected between the interfaces of the coolant-conductive layer and concrete wall and the interfaces between the fluid-conductive layer and the insulation, a layer of slippery sheet material being interposed between the insulation and the mortar. When the pressure vessel is thermally expanded by reactor operation, the annular space between it and the concrete wall is completely filled by these components so that zero-excursion rupture safeguard is provided for the vessel. 4 claims, 1 figure